National Library of Energy BETA

Sample records for implement projects topics

  1. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series ...

  2. Step 4: Project Implementation

    Energy Savers [EERE]

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  3. Financing Project Implementation

    Broader source: Energy.gov [DOE]

    This presentation covers typical sources of financing to implement energy efficiency projects in industry.

  4. Renewable Energy Project Development: Advanced Process Topics

    Energy Savers [EERE]

    Process Topics Understanding Energy Markets, Project Scale Decision Factors, Procurement Options, and the Role of the Project Team Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Processes for Developing Renewable Energy Projects on Tribal Lands - Understanding the Energy Market and Project Scale - Project Scale and Ownership Options - Procurement Process - Project Team  Additional Information and Resources 2 Introduction The U.S.

  5. Renewable Energy Project Development: Advanced Concept Topics

    Energy Savers [EERE]

    Concept Topics An Introduction to Risk, Tribal Roles, and Support Policies in the Renewable Energy Project Development Process Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Concepts and Policies for Understanding Renewable Energy Projects on Tribal Lands - Risk and Uncertainty - Tribal Project Roles - Policies and Incentives  Additional Information and Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy

  6. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... expected * Technology O&M Assumed low, mitigable or allocatable Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & ...

  7. Preparing for Project Implementation Announcing "the PRIZE",...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 14, 2010 8 - Preparing for Project Implementation Announcing "the PRIZE" Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web ...

  8. Preparing for Project Implementation Motivating Employees to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Implement Projects Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  9. Preparing for Project Implementation Assigning Accountability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assigning Accountability for Each Project, April 14, 2010 Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010 PDF icon Assigning ...

  10. Preparing for Project Implementation: Providing Resources for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  11. Preparing for Project Implementation Assigning Accountability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Each Project Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  12. Project Financing: From Identification to Implementation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Project Financing: From Identification to Implementation (April 16, 2009) More Documents & Publications Project Reports for Sac and Fox Tribe of the Mississippi in Iowa - ...

  13. Step 4: Project Implementation Introduction to Step 5: Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Operations & Maintenance Project Development Process 2 1 Potential 3 Refinement 2 Options 4 Implementation 5 Operations & Maintenance 3 Step 5: Operations & Maintenance ...

  14. Federal Sector Renewable Energy Project Implementation: "What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: "What's Working and Why" Implementation: What s Working and Why DOD-DOE Waste-to- Energy and Fuel Cell Workshop January 13, ...

  15. Solar Schools Assessment and Implementation Project: Financing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options on Solar Installations on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools This report focuses on ...

  16. Preparing for Project Implementation Measuring Energy Achievements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Achievements Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  17. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by Robert Westby, National Renewable Energy Laboratory, at the Waste-to-Energy Using ...

  18. Motivating Employees to Implement Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Motivating Employees to Implement Projects Motivating Employees to Implement Projects This presentation discusses how to motivate employees to implement energy efficiency projects from providing recognition to publishing results. PDF icon Motivating Employees to Implement Projects (June 9, 2010) More Documents & Publications Providing Resources for Implementation Having Plant Management Announce "the Prize", July 14, 2010 Providing Rewards and Recognition

  19. Creating a Climate for Successful Project Implementation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Creating a Climate for Successful Project Implementation Creating a Climate for Successful Project Implementation This presentation acknowledges the difficulty implementing identified opportunities for energy efficiency in order to achieve savings and offers strategies to overcome that difficulty. PDF icon Creating a Climate for Successful Project Implementation (December 9, 2009) More Documents & Publications Providing Rewards and Recognition Preparing for Project Implementation

  20. Implementing a Zero Energy Ready Home Multifamily Project (Technical...

    Office of Scientific and Technical Information (OSTI)

    Implementing a Zero Energy Ready Home Multifamily Project Citation Details In-Document Search Title: Implementing a Zero Energy Ready Home Multifamily Project You are accessing ...

  1. The institutional needs of joint implementation projects

    SciTech Connect (OSTI)

    Watt, E.; Sathaye, J.; Buen, O. de; Masera, O.; Gelil, I.A.; Ravindranath, N.H.; Zhou, D.; Li, J.; Intarapravich, D.

    1995-10-21

    In this paper, the authors discuss options for developing institutions for joint implementation (JI) projects. They focus on the tasks which are unique to JI projects or require additional institutional needs--accepting the project by the host and investor countries and assessing the project`s greenhouse gas (GHG) emission reduction or sequestration--and they suggest the types of institutions that would enhance their performance. The evaluation is based on four sets of governmental and international criteria for JI projects, the experiences of ten pilot JI projects, and the perspectives of seven collaborating authors from China, Egypt, India, Mexico, and Thailand, who interviewed relevant government and non-government staff involved in JI issue assessment in their countries. After examining the roles for potential JI institutions, they present early findings arguing for a decentralized national JI structure, which includes: (1) national governmental panels providing host country acceptance of proposed JI projects; (2) project parties providing the assessment data on the GHG reduction or sequestration for the projects; (3) technical experts calculating these GHG flows; (4) certified verification teams checking the GHG calculations; and (5) members of an international JI Secretariat training and certifying the assessors, as well as resolving challenges to the verifications. 86 refs.

  2. Preparing for Project Implementation during an Energy Assessment

    Broader source: Energy.gov [DOE]

    This presentation discusses actions to take during the energy assessment to encourage project implementation.

  3. Preparing for Project Implementation after an Energy Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy after an Energy Assessment Preparing for Project Implementation after an Energy Assessment This presentation covers concrete steps and implementation tactics to take after an energy assessment. PDF icon Preparing for Project Implementation after an Energy Assessment (March 10, 2010) More Documents & Publications Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010

  4. Energy Efficiency Projects: Overcoming Internal Barriers to Implementation

    Broader source: Energy.gov [DOE]

    This presentation discusses overcoming internal barriers to funding and/or implementing energy efficiency projects.

  5. Project Implementation Seminar Series: Creating a Climate for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Now LEADER Web Conference 1 Project Implementation Seminar Series: Fred Schoeneborn, CEM, ... Implementation Save Energy Now LEADER Web Conference Save Energy Now LEADER Web ...

  6. Integrated Project Team Guide for Formation and Implementation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8A, Integrated Project Team Guide for Formation and Implementation by John Makepeace Functional areas: Project Management The guide provides detailed guidance of the preferred...

  7. Proceedings of a Topical Meeting On Small Scale Geothermal Power Plants and Geothermal Power Plant Projects

    SciTech Connect (OSTI)

    1986-02-12

    These proceedings describe the workshop of the Topical Meeting on Small Scale Geothermal Power Plants and Geothermal Power Plant Projects. The projects covered include binary power plants, rotary separator, screw expander power plants, modular wellhead power plants, inflow turbines, and the EPRI hybrid power system. Active projects versus geothermal power projects were described. In addition, a simple approach to estimating effects of fluid deliverability on geothermal power cost is described starting on page 119. (DJE-2005)

  8. Federal ESPC Process Phase 4: Project Implementation and Construction |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: Project Implementation and Construction Federal ESPC Process Phase 4: Project Implementation and Construction Phase 4 of the energy savings performance contract (ESPC) process focuses on project implementation and construction. At this point, an ESPC project is much like any other construction project. In fact, the U.S. Department of Energy's (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC contains the Federal Acquisition Regulations clauses that normally

  9. Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010

    Broader source: Energy.gov [DOE]

    Presentation slides for Save Energy Now LEADER Web Conference Project Implementation Seminar Series, April 14, 2010

  10. Implementing Solar Projects on Federal Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing Solar Projects on Federal Sites Implementing Solar Projects on Federal Sites This illustration shows the processes to implement federal solar projects that are funded by their respective agencies, power purchase agreements, energy savings performance contracts, utility energy services contracts, and enhanced-use leases. For an Agency-Funded Project, the steps include secure funding, develop the scope of work, develop a request for proposal, issue a request for proposal, administer a

  11. Federal Renewable Energy Project Planning and Implementation | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Planning and Implementation Federal Renewable Energy Project Planning and Implementation The Federal Energy Management Program (FEMP) provides federal agencies with information about planning and implementing renewable energy projects. Whether integrated into existing buildings or part of new construction, renewable energy projects help agencies meet federal laws and requirements, including the Executive Order 13693 30% by 2025 goal and the goal for new federal buildings entering

  12. Preparing for Project Implementation after an Energy Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    after an Energy Assessment Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  13. Preparing for Project Implementation before an Energy Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEN Leaders Web Conference 1 Fred Schoeneborn, CEM, CEA January 13, 2010 2 - Preparing for Project Implementation before an Energy Assessment Save Energy Now LEADER Web Conference ...

  14. Preparing for Project Implementation during an Energy Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Energy Assessment Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference 2 Agenda Seminar Series Overview ...

  15. Preparing for Project Implementation: Providing Rewards and Recognitio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Providing Rewards and Recognition Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series ...

  16. Procuring and Implementing Solar Projects on Public Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls This webinar covered good practices for photovoltaic and solar water heating request for ...

  17. Integrated Project Team Guide for Formation and Implementation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-02-03

    The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B.

  18. Advanced Topics for the Portfolio Manager Initiative: Energy Disclosure Policy Implementation

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on the Energy Disclosure Policy Implementation

  19. Integrated Project Team Guide for Formation and Implementation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-02-03

    The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B. Admin Chg 1 dated 10-22-2015.

  20. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Assessment of As-Is Grid by Non-Utility Stakeholders Introduction One goal of this grid modernization project is to assess the current status of the electric power grid in West Virginia in order to define the potential to implement smart grid technologies. Thus, an initial task of this project was to define the current state or "As-Is" grid in West Virginia. Financial and time constraints prohibited the

  1. TEXAS CLEAN ENERGY PROJECT TOPICAL REPORT PHASE 1 FEBRUARY 2010-DECEMBER 2012

    SciTech Connect (OSTI)

    Mattes, Karl

    2012-11-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

  2. CleanFleet. Volume 2, Project Design and Implementation

    SciTech Connect (OSTI)

    1995-12-01

    The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

  3. Training implementation matrix, Spent Nuclear Fuel Project (SNFP)

    SciTech Connect (OSTI)

    EATON, G.L.

    2000-06-08

    This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently.

  4. Topic Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RAP Work Plan Topics Page 1 of 3 Topic Committee Potential FY 2016 Action/Product Context (from FY 2016 HAB Work Plan) 6-Month Status (IM, Committee, Advice, Deferred, No Action) 1. 100 Area retrieval process, K Basin RAP Project update (May not be ready until 2017 for an update; work ready in 2018 per milestone)  Attended tour in October 2015, including visit to MO-500/Sludge Annex facility 2. 100 D/H Proposed Plan RAP Project update Cleanup of soils and groundwater at D/H. Are the proposed

  5. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls (Text Version)

    Broader source: Energy.gov [DOE]

    Transcript of the webinar, "Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls."

  6. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    SciTech Connect (OSTI)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  7. CDM Projects in Colombia | Open Energy Information

    Open Energy Info (EERE)

    Projects in Colombia Jump to: navigation, search Name CDM Projects in Colombia AgencyCompany Organization C-O2 Sector Energy, Land Topics Finance, Implementation, Market analysis...

  8. Topic Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TWC Work Plan Topics Page 1 of 2 Topic Committee Potential FY 2016 Action/Product Context (from FY 2016 HAB Work Plan) 6-Month Status (IM, Committee, Advice, Deferred, No Action) 11. AY-102 status update TWC Project update Provide updates on the planning, design, and installation of the equipment to begin pumping waste from double-shell tank AY-102 no later than March 4, 2016.  Received briefing on A/AX tank farms retrieval at committee in September 2015  Attended tour in October 2015,

  9. Best-in-Class Project Management Initiative Corporate Implementation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc. BICPM "Best-in-Class" Project and Contract Management BCP Baseline Change Proposal CBC Consolidated ... EVMS Earned Value Management System F Field FPD Federal Project ...

  10. Best-In-Class Project Management Initiative Corporate Implementation Plan

    Broader source: Energy.gov [DOE]

    To continue Project Management and Contract Management Improvements, DOE EM has developed a vision for building a "Best-in-Class" Project Management and Contract Management organization.  Click...

  11. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    before and after Smart Grid Projected Total Complaints after Smart Grid A 'Business Case' model has been developed as part of the WV SGIP Project. This electric power grid model...

  12. Spent nuclear fuel removal program at the West Valley Demonstration Project: Topical report

    SciTech Connect (OSTI)

    Connors, B. J.; Golden, M. P.; Valenti, P. J.; Winkel, J. J.

    1987-03-01

    The spent nuclear fuel removal program at the West Valley Demonstration Project (WVDP) consisted of removing the spent nuclear fuel (SNF) assemblies from the storage pool in the plant, loading them in shielded casks, and preparing the casks for transportation. So far, four fuel removal campaigns have been completed with the return of 625 spent nuclear fuel assemblies to their four utility owners. A fifth campaign, which is not yet completed, will transfer the remaining 125 fuel assemblies to a government site in Idaho. A spent fuel rod consolidation demonstration has been completed, and the storage canisters and their racks are being removed from the fuel receiving and storage pool to make way for installation of the size reduction equipment. A brief history of the West Valley reprocessing plant and the events leading to the storage and ownership of the spent nuclear fuel assemblies and their subsequent removal from West Valley are also recorded as background information. 3 refs., 16 figs., 9 tabs.

  13. Tribal Renewable Energy Webinar on Project Implementation and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energy webinars. Addthis Related Articles DOE Announces Webinars on Tribal Energy Project Financing, Building Re-tuning for Energy Efficiency, and More DOE Announces...

  14. Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-08-19

    This Systems Engineering Implementation Plan (SEIP) describes the processes, products, and organizational responsibilities implemented by Project W-519 to further define how the project`s mission, defined initially by the Tank Waste Remediation System Phase 1 Privatization Infrastructure Project W-503 Mission Analysis Report (Hoertkorn 1997), will be accomplished using guidance provided by the Tank Waste Remediation System Systems Engineering Management Plan (SEMP) (Peck 1998). This document describes the implementation plans for moving from a stated mission to an executable cost, schedule, and technical baseline and to help ensure its successful completion of those baselines.

  15. TEXAS CLEAN ENERGY PROJECT DECISION POINT APPLICATION Section 2: TOPICAL REPORT PHASE 1 FEBRUARY 2010-OCTOBER 2013

    SciTech Connect (OSTI)

    Mattes, Karl

    2013-09-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

  16. Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8

    Broader source: Energy.gov [DOE]

    The Energy Department's Office of Indian Energy, Tribal Energy Program, and Western Area Power Administration will present the next Tribal Renewable Energy Series webinar, Project Implementation and Operations & Maintenance, on Friday, Aug. 8, 2014, from 11:00 a.m. to 12:30 p.m. Mountain time. The webinar will focus on the last two steps of a five-step tribal energy project development framework: Project Implementation and Operations and Maintenance (O&M).

  17. Implementing mitigative actions on the Superconducting Super Collider project

    SciTech Connect (OSTI)

    Sands, T.L. )

    1993-01-01

    The Super Collider is the first project for which a Mitigation Action Plan (MAP) was prepared under a DOE Order that became effective in 1990. The policy requires a MAP for any project where environmental findings were predicated on taking mitigative actions. The MAP must be approved prior to the start of preliminary design and thus cannot be site or facility-specific because the requisite level of detail would not be available. This gap is filled by a series of environmental compliance plans (ECP) that are prepared by the architect-engineer/constructions manager under the direction of the DOE Management and Operations Contractor for the Super Collider. A given ECP identifies the environmental protection measures applicable to the respective contract package. The designated design team uses the ECP as one of its requirements documents and the environmental staff uses it during design reviews to verify compliance with the MAP. Site audits and monitoring data are used to document compliance and verify the effectiveness of mitigative actions, or identify required corrective actions. The applicability of this process to other projects falling within the scope of the National Environmental Policy Act is discussed.

  18. Implementing a Zero Energy Ready Home Multifamily Project

    SciTech Connect (OSTI)

    Springer, David; German, Alea

    2015-08-17

    Building cost-effective, high-performance homes that provide superior comfort, health, and durability is the goal of the U.S. Department of Energy’s (DOE’s) Zero Energy Ready Home (ZERH) program. Building America research and other innovative programs throughout the country have addressed many of the technical challenges of building to the ZERH standard. The cost-effectiveness of measure packages that result in 30% source energy savings compared to a code-compliant home have been demonstrated. However, additional challenges remain, particularly with respect to convincing production builders of the strong business case for ZERH. The Alliance for Residential Building Innovation (ARBI) team believes that the keys to successfully engaging builders and developers in the California market are to help them leverage development agreement requirements, code compliance requirements, incentives, and competitive market advantages of ZERH certification, and navigate through this process. A primary objective of this project was to gain a highly visible foothold for residential buildings that are built to the DOE ZERH specification that can be used to encourage participation by other California builders. This report briefly describes two single-family homes that were ZERH certified and focuses on the experience of working with developer Mutual Housing on a 62-unit multifamily community at the Spring Lake subdivision in Woodland, California. The Spring Lake project is expected to be the first ZERH-certified multifamily project in the country. This report discusses the challenges encountered, lessons learned, and how obstacles were overcome.

  19. Implementation of the Brazilian National Repository - RBMN Project - 13008

    SciTech Connect (OSTI)

    Cassia Oliveira de Tello, Cledola

    2013-07-01

    Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining some requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)

  20. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  1. FEMP: Seven steps to saving: How to implement energy-saving projects

    SciTech Connect (OSTI)

    Pitchford, P.

    1999-05-26

    The Energy Policy Act of 1992 and supporting Executive Orders have directed Federal agencies to implement cost-effective energy and water efficient measures to help conserve natural resources and protect the environment. Federal energy and facility managers can make a big difference. DOE's Federal Energy Management Program (FEMP) has outlined seven steps on how to implement an energy-saving project.

  2. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste plan

    SciTech Connect (OSTI)

    Latray, D.A.

    1998-05-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  3. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect (OSTI)

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  4. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    SciTech Connect (OSTI)

    Burgard, K.G.

    1998-09-24

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

  5. Software Environment for the Implementation of Tomographic Reconstruction Algorithms Applied to Cases of Few Projections

    SciTech Connect (OSTI)

    Rios, A. B.; Valda, A.; Somacal, H.

    2007-10-26

    Usually tomographic procedure requires a set of projections around the object under study and a mathematical processing of such projections through reconstruction algorithms. An accurate reconstruction requires a proper number of projections (angular sampling) and a proper number of elements in each projection (linear sampling). However in several practical cases it is not possible to fulfill these conditions leading to the so-called problem of few projections. In this case, iterative reconstruction algorithms are more suitable than analytic ones. In this work we present a program written in C++ that provides an environment for two iterative algorithm implementations, one algebraic and the other statistical. The software allows the user a full definition of the acquisition and reconstruction geometries used for the reconstruction algorithms but also to perform projection and backprojection operations. A set of analysis tools was implemented for the characterization of the convergence process. We analyze the performance of the algorithms on numerical phantoms and present the reconstruction of experimental data with few projections coming from transmission X-ray and micro PIXE (Particle-Induced X-Ray Emission) images.

  6. Philadelphia gas works medium-Btu coal gasification project: capital and operating cost estimate, financial/legal analysis, project implementation

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This volume of the final report is a compilation of the estimated capital and operating costs for the project. Using the definitive design as a basis, capital and operating costs were developed by obtaining quotations for equipment delivered to the site. Tables 1.1 and 1.2 provide a summary of the capital and operating costs estimated for the PGW Coal Gasification Project. In the course of its Phase I Feasibility Study of a medium-Btu coal-gas facility, Philadelphia Gas Works (PGW) identified the financing mechanism as having great impact on gas cost. Consequently, PGW formed a Financial/Legal Task Force composed of legal, financial, and project analysis specialists to study various ownership/management options. In seeking an acceptable ownership, management, and financing arrangement, certain ownership forms were initially identified and classified. Several public ownership, private ownership, and third party ownership options for the coal-gas plant are presented. The ownership and financing forms classified as base alternatives involved tax-exempt and taxable financing arrangements and are discussed in Section 3. Project implementation would be initiated by effectively planning the methodology by which commercial operation will be realized. Areas covered in this report are sale of gas to customers, arrangements for feedstock supply and by-product disposal, a schedule of major events leading to commercialization, and a plan for managing the implementation.

  7. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  8. Safety basis academy summary of project implementation from 2007-2009

    SciTech Connect (OSTI)

    Johnston, Julie A

    2009-01-01

    During fiscal years 2007 through 2009, in accordance with Performance Based Incentives with DOE/NNSA Los Alamos Site Office, Los Alamos National Security (LANS) implemented and operated a Safety Basis Academy (SBA) to facilitate uniformity in technical qualifications of safety basis professionals across the nuclear weapons complex. The implementation phase of the Safety Basis Academy required development, delivery, and finalizing a set of 23 courses. The courses developed are capable of supporting qualification efforts for both federal and contractor personnel throughout the DOE/NNSA Complex. The LANS Associate Director for Nuclear and High Hazard Operations (AD-NHHO) delegated project responsibillity to the Safety Basis Division. The project was assigned to the Safety Basis Technical Services (SB-TS) Group at Los Alamos National Laboratory (LANL). The main tasks were project needs analysis, design, development, implementation of instructional delivery, and evaluation of SBA courses. DOE/NNSA responsibility for oversight of the SBA project was assigned to the Chief of Defense for Nuclear Safety, and delegated to the Authorization Basis Senior Advisor, Continuous Learning Chair (CDNS-ABSA/CLC). NNSA developed a memorandum of agreement with LANS AD-NHHO. Through a memorandum of agreement initiated by NNSA, the DOE National Training Center (NTC) will maintain the set of Safety Basis Academy courses and is able to facilitate course delivery throughout the DOE Complex.

  9. EERC pilot-scale CFBC evaluation facility Project CFB test results. Topical report, Task 7.30

    SciTech Connect (OSTI)

    Mann, M.D.; Hajicek, D.R.; Henderson, A.K.; Moe, T.A.

    1992-09-01

    Project CFB was initiated at the University of North Dakota Energy and Environmental Research Center (EERC) in May 1988. Specific goals of the project were to (1) construct a circulating fluidized-bed combustor (CFBC) facility representative of the major boiler vendors` designs with the capability of producing scalable data, (2) develop a database for use in making future evaluations of CFBC technology, and (3) provide a facility for evaluating fuels, free of vendor bias for use in the - energy industry. Five coals were test-burned in the 1-MWth unit: North Dakota and Asian lignites, a Wyoming subbituminous, and Colorado and Pennsylvania bituminous coats. A total of 54 steady-state test periods were conducted, with the key test parameters being the average combustor temperature, excess air, superficial gas velocity, calcium-to-sulfur molar ratio, and the primary air-to-secondary air split. The capture for a coal fired in a CFBC is primarily dependent upon the total alkali-to-sulfur ratio. The required alkali-to ratio for 90% sulfur retention ranged from 1.4 to 4.9, depending upon coal type. While an alkali-to-ratio of 4.9 was required to meet 90% sulfur retention for the Salt Creek coal versus 1.4 for the Asian lignite, the total amount of sorbent addition required is much less for the Salt Creek coal, 4.2 pound sorbent per million Btu coal input, versus 62 pound/million Btu for the Asian lignite. The bituminous coals tested show optimal capture at combustor temperatures of approximately 1550{degree}F, with low-rank coals having optimal sulfur capture approximately 100{degree}F lower.

  10. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  11. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect (OSTI)

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support project facilities in a safe and environmentally acceptable manner; and non-power generating alternatives, such as conservation and demand-side management.

  12. TORUS: Theory of Reactions for Unstable iSotopes.Topical Collaboration for Nuclear Theory Project. Period: June 1, 2010 - May 31, 2015

    SciTech Connect (OSTI)

    Arbanas, Goran; Elster, Charlotte; Escher, Jutta; Nunes, Filomena; Thompson, Ian

    2015-08-28

    The work of this collaboration during its existence is summarized. The mission of the TORUS Topical Collaboration was to develop new methods that advance nuclear reaction theory for unstable isotopes by using three-body techniques to improve direct reaction calculations. This multi-institution collaborative effort was and remains directly relevant to three areas of interest: the properties of nuclei far from stability, microscopic studies of nuclear input parameters for astrophysics, and microscopic nuclear reaction theory. The TORUS project focused on understanding the details of (d,p) reactions for neutron transfer to heavier nuclei. The bulk of the work fell into three areas: coupled channel theory, modeling (d,p) reactions with a Faddeev-AGS approach, and capture reactions.

  13. Smart Grid Investment Grant Topic Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topic Areas Smart Grid Investment Grant Topic Areas A description of the topic areas for projects selected for award under the Smart Grid Investment Grant project of the American ...

  14. Featured Topic Pages

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Featured Topic Pages * Renowned scientists, with information about the scientists' R&D results * Significant DOE research disciplines, with R&D results * Manhattan Project, including scientists and key events Laureates * Nobel Prize winners associated with DOE and predecessor agencies * Winners of the Enrico Fermi Award, a U.S. Presidential award Database * Selected documents about noteworthy R&D results * Documents and individual pages searchable by word or phrase * Tag cloud

  15. Implementing Solar Photovoltaic Projects on Historic Buildings and in Historic Districts

    SciTech Connect (OSTI)

    Kandt, A.; Hotchkiss, E.; Walker, A.

    2011-01-01

    Despite a global recession, the number of photovoltaic (PV) installations in the United States grew 30% from 2008 to 2009. A number of trends point toward continued growth of new PV installations. The efficiency of solar panels is increasing, while installation costs are going down. At the same time, federal, state, and local regulations are requiring that greater amounts of energy must come from renewable sources. Incentives for solar power technology implementation are being created and regulatory barriers removed. Corporations and governments are focusing on solar power to demonstrate leadership in environmental sustainability and resource conservation. Architects and builders are including PV arrays as a way to meet green building standards and property owners are seeking PV as a way to reduce their utility bills, as well as their carbon footprints. This publication focuses on the implementation of PV systems on historic properties. Many private property owners, as well as local, state, and national government entities, are seeking guidance on how best to integrate solar PV installations on historic buildings. Historic preservationists maintain that preserving, reusing, and maintaining historic structures is a key sustainable design strategy while also recognizing the importance of accommodating renewable energy technologies where they are appropriate. In some cases, however, conflicts have arisen over the installation of PV panels on historic properties. Addressing these conflicts and providing guidance regarding solutions and best practices is an important step toward resolving or eliminating barriers. Historic properties and districts in the United States provide tangible connections to the nation's past. Thousands of buildings, sites, districts, structures, and objects have been recognized for their historic and architectural significance. Local, state, and national designations of historic properties provide recognition, protection, and incentives that help to preserve those properties for future generations. At the national level, the National Register of Historic Places includes more than 86,000 listings, which encompass a total of more than 1.6 million historic resources. State registers of historic places also provide recognition and protection for historic sites and districts. Locally, more than 2,400 communities have established historic preservation ordinances. Typically implemented through zoning overlays, these local land use regulations manage changes to hundreds of thousands of historic properties. Over a period of 2 years (2007 and 2008) the U.S. Department of Energy (DOE) designated 25 major U.S. cities as Solar America Cities. DOE provided financial and technical assistance to help the cities develop comprehensive approaches to accelerate the adoption of solar energy technologies. The Solar America Cities partnerships represent the foundation of DOE's larger Solar America Communities program. As a part of this program, DOE identified the implementation of solar projects on historic properties and in historic districts as one area to address. A workshop titled 'Implementing Solar Projects on Historic Buildings and in Historic Districts' was held in Denver, Colorado, in June of 2010. Participants included representatives from the solar industry as well as historic preservationists from nonprofit organizations and government agencies at the local, state, and national levels. The workshop provided an opportunity to gain a common understanding of solar technologies and historic preservation procedures and priorities. The workshop participants also discussed some of the challenges involved in locating PV systems on historic properties and identified potential solutions. This publication is based on the discussions that occurred at this workshop and the recommendations that were developed by participants. Ideas expressed by participants in the workshop, and included in this document, do not necessarily reflect the opinion of any government council, agency, or entity.

  16. Technical Assistance Topics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Policy Coordination and Implementation » Electricity Policy Technical Assistance Program » Technical Assistance Topics Technical Assistance Topics Topics addressed are those of greatest interest to states, regions, and Tribes, including: Reliability, resiliency, and cyber security of electric power systems Electric resource planning, integrated resource planning, regional transmission planning, and resource acquisition strategies Ratepayer-funded energy efficiency, demand response,

  17. Discussion series on PURPA related topics: load management

    SciTech Connect (OSTI)

    Sturgeon, J I

    1980-08-01

    The Discussion Series on PURPA Related Topics is composed of five volumes: Metering, Billing, Information to Customers, Load Management Techniques and Master Metering. These reports are based on twenty-five Demonstration and Implementation projects sponsored and directed during the past five years by the US Department of Energy, Office of Utility Systems. Each of the topics bears directly on one or more of the federal standards contained in the Public Utilities Regulatory Policies Act of 1978 (PURPA). This volume, Load Management Techniques, relates primarily to the Time-of-Day rates standard, PURPA IB(d)3. The experiences related in this report deal, in part, with the procedures and equipment which are affected when time-of-day rates are implemented. One goal of this report is to describe how people in a variety of settings have dealt with the many practical issues in load management. Another is to highlight the lessons and summarize the experiences of the Project participants. This report does not stand as a manual nor provide prescriptive guidelines on how to deal with the topic. Rather it offers an account for those charged with the responsibility of implementing PURPA requirements to learn from the insights and problems which occurred during the Rate Demonstration projects.

  18. Solar For Schools: A Case Study in Identifying and Implementing Solar Photovoltaic (PV) Projects in Three California School Districts: Preprint

    SciTech Connect (OSTI)

    Kandt, A.

    2011-04-01

    The Department of Energy's (DOE) Solar America Showcase program seeks to accelerate demand for solar technologies among key end use market sectors. As part of this activity the DOE provides Technical Assistance through its national laboratories to large-scale, high-visibility solar installation projects. The Solar Schools Assessment and Implementation Project (SSAIP) in the San Francisco Bay area was selected for a 2009 DOE Solar American Showcase award. SSAIP was formed through the efforts of the nonprofit Sequoia Foundation and includes three school districts: Berkeley, West Contra Costa, and Oakland Unified School Districts. This paper summarizes the technical assistance efforts that resulted from this technical assistance support. It serves as a case study and reference document detailing the steps and processes that could be used to successfully identify, fund, and implement solar PV projects in school districts across the country.

  19. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls

    Broader source: Energy.gov [DOE]

    This webinar covered good practices for photovoltaic and solar water heating request for proposal processes, pitfalls, and helpful tools and resources to support procurement and implementation.

  20. Project Implementation and Replication, November 22, 2013: Fred Schoeneborn (FCS Consulting)

    Broader source: Energy.gov [DOE]

    This pre-In-Plant Training webinar for the Better Plants Program provides guidance on implementing and replicating energy efficiency opportunities identified by energy assessments. Download the...

  1. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    SciTech Connect (OSTI)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR {section} 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents.

  2. Otec power plant for the Marshall Islands. Feasibility study phase 2. Project implementation. Final report. Export trade information

    SciTech Connect (OSTI)

    1996-03-25

    This report presents the results of phase 2 of a study which was conducted to assess the economic and design feasibility of a 5-10 MW OTEC power plant to be installed at Majuro, Marshall Islands. The document is divided into (1) Introduction; (2) Executive Summary; (3) Study Highlights, Conclusions, and Recommendations; (4) Phase 2 - Project Implementation Goals; (5) Study Task 1.0 - Project Planning; (6) Study Task 2.0 - Conceptual Design/Risk Reduction; (7) Preliminary Oceanographic and Site Survey; (8) List of References; (9) List of Appendices.

  3. Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools

    Broader source: Energy.gov [DOE]

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts.

  4. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    SciTech Connect (OSTI)

    Gales, S. Zamfir, N. V.

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  5. TEC Communications Topic Group

    Office of Environmental Management (EM)

    procurement - Routing criteriaemergency preparedness Tribal Issues Topic Group * TEPP Navajo Nation (Tom Clawson) - 1404 - Needs Assessment * Identified strengths and...

  6. Targeted technology applications for infield reserve growth: A synopsis of the Secondary Natural Gas Recovery project, Gulf Coast Basin. Topical report, September 1988--April 1993

    SciTech Connect (OSTI)

    Levey, R.A.; Finley, R.J.; Hardage, B.A.

    1994-06-01

    The Secondary Natural Gas Recovery (SGR): Targeted Technology Applications for Infield Reserve Growth is a joint venture research project sponsored by the Gas Research Institute (GRI), the US Department of Energy (DOE), the State of Texas through the Bureau of Economic Geology at The University of Texas at Austin, with the cofunding and cooperation of the natural gas industry. The SGR project is a field-based program using an integrated multidisciplinary approach that integrates geology, geophysics, engineering, and petrophysics. A major objective of this research project is to develop, test, and verify those technologies and methodologies that have near- to mid-term potential for maximizing recovery of gas from conventional reservoirs in known fields. Natural gas reservoirs in the Gulf Coast Basin are targeted as data-rich, field-based models for evaluating infield development. The SGR research program focuses on sandstone-dominated reservoirs in fluvial-deltaic plays within the onshore Gulf Coast Basin of Texas. The primary project research objectives are: To establish how depositional and diagenetic heterogeneities cause, even in reservoirs of conventional permeability, reservoir compartmentalization and hence incomplete recovery of natural gas. To document examples of reserve growth occurrence and potential from fluvial and deltaic sandstones of the Texas Gulf Coast Basin as a natural laboratory for developing concepts and testing applications. To demonstrate how the integration of geology, reservoir engineering, geophysics, and well log analysis/petrophysics leads to strategic recompletion and well placement opportunities for reserve growth in mature fields.

  7. Report on field experiment program lithium bromide absorption chiller: Field gas conditioning project, Grayson County, Texas. Topical report, May 1991-December 1994

    SciTech Connect (OSTI)

    Lane, M.J.; Kilbourn, R.A.; Huey, M.A.

    1995-12-01

    The primary objective of the project was to determine the applicability of using commercial absorption air conditioning technology in an oil and gas field environment to condition natural gas to meet contractual limitations. Operational and maintenance requirements were documented throughout the test period of 1992 through 1994.

  8. Implementing Solar PV Projects on Historic Buildings and in Historic Districts

    SciTech Connect (OSTI)

    Kandt, A.; Hotchkiss, E.; Walker, A.; Buddenborg, J; Lindberg, J.

    2011-09-01

    Many municipalities, particularly in older communities of the United States, have a large amount of historic buildings and districts. In addition to preserving these historic assets, many municipalities have goals or legislative requirements to procure a certain amount of energy from renewable sources and to become more efficient in their energy use; often, these requirements do not exempt historic buildings. This paper details findings from a workshop held in Denver, Colorado, in June 2010 that brought together stakeholders from both the solar and historic preservation industries. Based on these findings, this paper identifies challenges and recommends solutions for developing solar photovoltaic (PV) projects on historic buildings and in historic districts in such a way as to not affect the characteristics that make a building eligible for historic status.

  9. Engineering work plan for implementing the Process Condensate Recycle Project at the 242-A evaporator

    SciTech Connect (OSTI)

    Haring, D.S.

    1995-02-02

    The 242-A Evaporator facility is used to reduce the volume of waste stored in the Hanford double shell tanks. This facility uses filtered raw water for cooling, de-entrainment pad sprays, pump seal water, and chemical tank make-up. Some of these uses result in the introduction of filtered raw water into the process, thus increasing the volume of waste requiring evaporation and subsequent treatment by the 200 East Effluent Treatment Facility. The pump seal water and the de-entrainment pad spray systems were identified as candidates for a waste minimization upgrade. This work plan describes the activities associated with the design, installation, testing and initial operation of the process condensate recycle system. Implementation of the process condensate recycle system will permit the use of process condensate in place of raw water for the de-entrainment pad sprays and pump seals. This will reduce the amount of low-level liquid waste and generated during facility operation through source reduction and recycling.

  10. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  11. TEC Working Group Topic Groups Section 180(c) Key Documents ...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Section 180(c) Key Documents Key Documents Briefing Package for Section 180(c) Implementation - July 2005 PDF icon Executive Summary...

  12. Projections of the impact of expansion of domestic heavy oil production on the U.S. refining industry from 1990 to 2010. Topical report

    SciTech Connect (OSTI)

    Olsen, D.K.; Ramzel, E.B.; Strycker, A.R.; Guariguata, G.; Salmen, F.G.

    1994-12-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil (10{degrees} to 20{degrees} API gravity) production. This report provides a compendium of the United States refining industry and analyzes the industry by Petroleum Administration for Defense District (PADD) and by ten smaller refining areas. The refining capacity, oil source and oil quality are analyzed, and projections are made for the U.S. refining industry for the years 1990 to 2010. The study used publicly available data as background. A linear program model of the U.S. refining industry was constructed and validated using 1990 U.S. refinery performance. Projections of domestic oil production (decline) and import of crude oil (increases) were balanced to meet anticipated demand to establish a base case for years 1990 through 2010. The impact of additional domestic heavy oil production, (300 MB/D to 900 MB/D, originating in select areas of the U.S.) on the U.S. refining complex was evaluated. This heavy oil could reduce the import rate and the balance of payments by displacing some imported, principally Mid-east, medium crude. The construction cost for refining units to accommodate this additional domestic heavy oil production in both the low and high volume scenarios is about 7 billion dollars for bottoms conversion capacity (delayed coking) with about 50% of the cost attributed to compliance with the Clean Air Act Amendment of 1990.

  13. ARM - Topic List

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TeachersTopic List Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Topic List Atmosphere Atmospheric Heat Budget Atmospheric Pressure Composition of the Atmosphere Evolution of the Atmosphere Mesosphere Stratosphere Thermosphere Troposphere Oceans Oceans Sea Surface and Sea Level Weather and

  14. Chapter 12, Survey Design and Implementation Cross-Cutting Protocols for Estimating Gross Savings: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 12: Survey Design and Implementation Cross-Cutting Protocols for Estimating Gross Savings Robert Baumgartner, Tetra Tech Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 12 - 1 Chapter 12 - Table of Contents 1 Introduction ............................................................................................................................ 2 2 The Total Survey Error Framework

  15. Renewable Energy Project Development: Advanced Concept Topics

    Office of Environmental Management (EM)

    ... control for safetysecurity purposes Permitting * Tribally adopted codes and permitting requirements * Utility interconnection requirements Finance * Capital availability * ...

  16. Topical Committee | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topical Committee Topical Committee In the interest of optimum technology transfer, the DOE Technical Standards Program (TSP) has set up a network of topical committees. These committees provide a forum for communication across the DOE complex on technical standards related activities. If you would like information about a specific topical committee, or wish to join one of the groups, we've provided a roster of TSP Topical Committees and corresponding Topical Committee Chairpersons. Expectations

  17. Decision Point 1 Topical Report

    SciTech Connect (OSTI)

    Yablonsky, Al; Barsoumian, Shant; Legere, David

    2013-05-01

    This Topical Report addresses accomplishments achieved during Phase 2a of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and proliferation. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to elaborate proven SkyMine® process chemistry to commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of the current Phase (2a) is to complete the detailed design of the pilot plant to be built in Phase 2b.

  18. Search tool plug-in: imploements latent topic feedback

    Energy Science and Technology Software Center (OSTI)

    2011-09-23

    IRIS is a search tool plug-in that is used to implement latent topic feedback for enhancing text navigation. It accepts a list of returned documents from an information retrieval wywtem that is generated from keyword search queries. Data is pulled directly from a topic information database and processed by IRIS to determine the most prominent and relevant topics, along with topic-ngrams, associated with the list of returned documents. User selected topics are then used tomore » expand the query and presumabley refine the search results.« less

  19. UNIRIB: Physics Topics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Topics Research Capitalizing on the strengths of nine collaborating research universities and the world-class equipment available at the Holifield Radioactive Ion Beam Facility (HRIBF) at Oak Ridge National Laboratory (ORNL), the University Radioactive Ion Beam (UNIRIB) consortium is conducting research at the forefront of nuclear physics. UNIRIB, a division of the Oak Ridge Institute for Science and Education (ORISE), brings together researchers from around the world to study the

  20. Manufacturing Innovation Topics Workshop

    Broader source: Energy.gov [DOE]

    The Advanced Manufacturing Office (AMO) and the Office of the Secretary of Defense Manufacturing Technology Program (OSD ManTech) will host a workshop to discuss AMO's recent Request for Information (RFI) on Clean Energy Manufacturing Topic Areas as well as the recent areas of interest announced by OSD ManTech for a new Manufacturing Innovation Institute on October 8-9, 2014 in Fort Worth, TX.

  1. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    SciTech Connect (OSTI)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    2001-05-01

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  2. Providing Resources for Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resources for Implementation Providing Resources for Implementation This presentation discusses the resources needed to prepare for implementing an energy efficiency project and provides suggestions for developing internal resources and seeking external ones. PDF icon Providing Resources for Implementation (May 12, 2010) More Documents & Publications Creating a Climate for Successful Project Implementation Preparing for Project Implementation Assigning Accountability for Each Project, April

  3. Next Steps to Implement Renewable Energy Project on the Makah Indian Naiton for the Pacific North West Region

    SciTech Connect (OSTI)

    Martin Wilde, Coyote Energy, Inc.

    2005-12-30

    The two year feasibility project was conducted to determine if the Makah reservation wind resource is viable for commercial generation and to investigate the viability and implementaiton of a tribal utility company capable of conducting energy business on the reservation.

  4. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    SciTech Connect (OSTI)

    Kosonen, M.; Hakola, M.

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

  5. Activities implemented jointly: First report to the Secretariat of the United Nations Framework Convention on Climate Change. Accomplishments and descriptions of projects accepted under the U.S. Initiative on Joint Implementation

    SciTech Connect (OSTI)

    1996-07-01

    More than 150 countries are now Party to the United Nations Framework Convention on Climate Change (FCCC), which seeks, as its ultimate objective, to stabilize atmospheric concentrations of greenhouse gases at a level that would prevent dangerous human interference with the climate system. As a step toward this goal, all Parties are to take measures to mitigate climate change and to promote and cooperate in the development and diffusion of technologies and practices that control or reduce emissions and enhance sinks of greenhouse gases. In the US view, efforts between countries or entities within them to reduce net greenhouse gas emissions undertaken cooperatively--called joint implementation (JI)--holds significant potential both for combating the threat of global warming and for promoting sustainable development. To develop and operationalize the JI concept, the US launched its Initiative on Joint Implementation (USIJI) in October 1993, and designed the program to attract private sector resources and to encourage the diffusion of innovative technologies to mitigate climate change. The USIJI provides a mechanism for investments by US entities in projects to reduce greenhouse gas emissions worldwide and has developed a set of criteria for evaluating proposed projects for their potential to reduce net GHG emissions.

  6. TECHNICAL STANDARDS PROGRAM TOPICAL COMMITTEES

    Broader source: Energy.gov [DOE]

    PurposeThis procedure describes how topical committees are organized and recognized under the Technical Standards Program. 

  7. Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) funds a wide variety of renewable energy and energy efficiency projects in an effort to assist tribes in realizing their energy visions.

  8. U.S. Coast Guard and Florida Power & Light Successfully Implement a Multi-Site UESC Project

    Energy Savers [EERE]

    U.S. Advanced Manufacturing and Clean Energy Technology Challenges May 6, 2014 AMO Peer Review Mark Johnson Director Advanced Manufacturing Office www.manufacturing.energy.gov This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 Outline * Big Picture on Manufacturing in US * Focus on Advanced Manufacturing * AMO Organization * Technical Assistance * R&D Facilities * R&D Projects * Goals for Meeting 3 Products invented here, now made

  9. Special Topics and Data Reports

    U.S. Energy Information Administration (EIA) Indexed Site

    (HTML format) Yellow Arrow Energy Consumption and Expenditures (HTML format) adobe logo Download Acrobat Reader for viewing PDF files. Special Topics and Data Reports...

  10. Tematea: Issue Based Modules for Coherent Implementation of Biodiversi...

    Open Energy Info (EERE)

    United Nations Environment Programme, International Union for Conservation of Nature Sector: Land Topics: Implementation, Co-benefits assessment, - Environmental and...

  11. Best Practices in Non-Motorized Transport Planning, Implementation...

    Open Energy Info (EERE)

    Transportation Topics: Implementation, Market analysis, Pathways analysis Resource Type: Lessons learnedbest practices Website: www.cyclingbotswana.orgfileadmin...

  12. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS infrastructure development Matthew Tanner Office of Petroleum, Gas, & Biofuels Analysis U.S. Energy Information Administration October 25, 2010 This paper is released to encourage discussion and critical comment. The analysis and conclusions ex- pressed here are those of the author and not necessarily those of the U.S. Energy Information Administration. Author: Matthew Tanner, matthew.tanner@eia.gov

  13. APT accelerator. Topical report

    SciTech Connect (OSTI)

    Lawrence, G.; Rusthoi, D.

    1995-03-01

    The Accelerator Production of Tritium (APT) project, sponsored by Department of Energy Defense Programs (DOE/DP), involves the preconceptual design of an accelerator system to produce tritium for the nation`s stockpile of nuclear weapons. Tritium is an isotope of hydrogen used in nuclear weapons, and must be replenished because of radioactive decay (its half-life is approximately 12 years). Because the annual production requirements for tritium has greatly decreased since the end of the Cold War, an alternative approach to reactors for tritium production, based on a linear accelerator, is now being seriously considered. The annual tritium requirement at the time this study was undertaken (1992-1993) was 3/8 that of the 1988 goal, usually stated as 3/8-Goal. Continued reduction in the number of weapons in the stockpile has led to a revised (lower) production requirement today (March, 1995). The production requirement needed to maintain the reduced stockpile, as stated in the recent Nuclear Posture Review (summer 1994) is approximately 3/16-Goal, half the previous level. The Nuclear Posture Review also requires that the production plant be designed to accomodate a production increase (surge) to 3/8-Goal capability within five years, to allow recovery from a possible extended outage of the tritium plant. A multi-laboratory team, collaborating with several industrial partners, has developed a preconceptual APT design for the 3/8-Goal, operating at 75% capacity. The team has presented APT as a promising alternative to the reactor concepts proposed for Complex-21. Given the requirements of a reduced weapons stockpile, APT offers both significant safety, environmental, and production-fexibility advantages in comparison with reactor systems, and the prospect of successful development in time to meet the US defense requirements of the 21st Century.

  14. Events & Topics | Metrolink Tour | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events & Topics | Metrolink Tour Events & Topics | Metrolink Tour

  15. Climate, Community and Biodiversity Project Design Standards...

    Open Energy Info (EERE)

    Topics: Implementation, Co-benefits assessment, Pathways analysis Resource Type: Guidemanual Website: www.climate-standards.orgstandardspdfccbstandardssecondeditiond...

  16. TEC Working Group Topic Groups Archives Consolidated Grant Topic Group

    Broader source: Energy.gov [DOE]

    The Consolidated Grant Topic Group arose from recommendations provided by the TEC and other external parties to the DOE Senior Executive Transportation Forum in July 1998. It was proposed that the consolidation of multiple funding streams from numerous DOE sources into a single grant would provide a more equitable and efficient means of assistance to States and Tribes affected by DOE nuclear material shipments.

  17. More About "Topic A" and "Topic B" Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of major new long-distance transmission facilities and networks. Topic A, Interconnection-Level Analysis and Planning Learn more about "Topic A" requirements Topic B, ...

  18. Cost benefit analysis for the implementation of smart metering...

    Open Energy Info (EERE)

    with pilot project (Smart Grid Project) Jump to: navigation, search Project Name Cost benefit analysis for the implementation of smart metering with pilot project Country...

  19. Physics Topics - MST - UW Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Topics UW Madison Madison Symmetric Torus Physics Topics MST HomeGraduate Student InformationLinksTourControl and Auxiliary SystemsPhysics TopicsDeviceResearch MissionMST ...

  20. Implementation of Metal Casting Best Practices

    SciTech Connect (OSTI)

    Eppich, Robert; Naranjo, Robert D.

    2007-01-01

    The project examined cases where metal casters had implemented ITP research results and the benefits they received due to that implementation. In cases where casters had not implemented those results, the project examined the factors responsible for that lack of implementation. The project also informed metal casters of the free tools and service offered by the ITP Technology Delivery subprogram.

  1. Missouri Botanical Gardens Tour | Events & Topics | Photosynthetic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Events & Topics Missouri Botanical Gardens Tour | Events & Topics PARC welcomed community members for our guided tour of the Missouri Botanical Garden. http:...

  2. TEC Working Group Topic Groups Archives

    Broader source: Energy.gov [DOE]

    The following Topic Groups are no longer active; however, related documents and notes for these archived Topic Groups are available through the following links:

  3. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  4. Feb. 25 Webinar Will Focus on Managing and Implementing Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Webinar Will Focus on Managing and Implementing Energy Projects for Community Economic Development Feb. 25 Webinar Will Focus on Managing and Implementing Energy Projects for ...

  5. 2012 LANSCE Topical User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 LANSCE Topical User Meeting January 9-10, 2012 The Office of Defense Programs is developing a long-term strategy for the construction of new experimental science facilities supporting NNSA missions. The new facilities will provide the critical science and technology capabilities necessary to execute the 21 st century responsibilities of NNSA in executing its mission and in supporting the broader national security agenda. The call focuses on large facilities with costs exceeding $100M. The NNSA

  6. Project Management Publications & Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications & Documents Project Management Publications & Documents << Return to Directives & Documents | Proceed to Policy & Guidance >> Filter by Source Filter by Topic

  7. Energy Efficiency Projects: Overcoming Internal Barriers to Implementa...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Projects: Overcoming Internal Barriers to Implementation Energy Efficiency Projects: Overcoming Internal Barriers to Implementation This presentation discusses...

  8. Energy Efficiency Projects: Overcoming Internal Barriers to Implementa...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Projects: Overcoming Internal Barriers to Implementation Energy Efficiency Projects: Overcoming Internal Barriers to Implementation This presentation discusses ...

  9. NSF final project report planning and implementation of the U.S. Joint Global Ocean Flux Study (U.S. JGOFS)

    SciTech Connect (OSTI)

    Livingston, Hugh D.

    1996-07-01

    Conducted planning and implementation of ocean carbon dioxide hydrographic surveys ocean process studies, time-series studies of Bermuda and Hawaii, and sponsored scientific workshops for those activities.

  10. Turkmenistan-GEF Projects | Open Energy Information

    Open Energy Info (EERE)

    Topics Background analysis Website http:www.gefonline.orgproje Country Turkmenistan Central Asia References GEF Climate Projects1 For a list of GEF climate projects in...

  11. TEC Working Group Topic Groups Archives Mechanics of Funding and Techical

    Office of Environmental Management (EM)

    Assistance | Department of Energy Mechanics of Funding and Techical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Techical Assistance Mechanics of Funding and Techical Assistance Items Available for Download PDF icon Funding Mechanisms Comparison Matrix More Documents & Publications TEC Working Group Topic Groups Section 180(c) Key Documents Implementation of Section 180(c) of the Nuclear Waste Policy Act TEC Working Group Topic Groups Tribal Conference Call

  12. WTP Communications Strategy Discussion Topics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discussion Topics For discussion at the April 7, 2015 PIC meeting Issue Managers: Bob Suyama, Dave Bernhard, Melanie Myers-Magnuson, Dirk Dunning, Liz Mattson, Pam Larsen, Ken Niles Some potential questions and areas that the TWC/PIC need to discuss in order to develop a Communica- tions Strategy for the Waste Treatment Plant. These questions represent the data that the TWC/PIC might need in order to provide a plan that will be of value to the Tri-Party Agencies and the Public and Stakeholders.

  13. Fiscal Year 2017 Project Prioritization | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Project Prioritization Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided Information on FY'17 Projects for the NNMCB to Prioritize. PDF icon FY'17 ...

  14. Legal Frameworks for REDD: Design and Implementation at the National...

    Open Energy Info (EERE)

    National Level AgencyCompany Organization: International Union for Conservation of Nature Sector: Land Focus Area: Forestry Topics: Implementation Resource Type: Publications...

  15. Pathways for Implementing REDD+: Experiences from Carbon Markets...

    Open Energy Info (EERE)

    Centre Sector: Land Focus Area: Forestry Topics: Finance, Implementation Resource Type: Lessons learnedbest practices Website: www.acp-cd4cdm.orgmedia237951...

  16. Beowawe Bottoming Binary Project Geothermal Project | Open Energy...

    Open Energy Info (EERE)

    1 Recovery Act: Geothermal Technologies Program Project Type Topic 2 Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and...

  17. Implementation Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Plan Template Implementation Plan Template Project Implementation Plan Template, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website. PDF icon Project Implementation Plan More Documents & Publications Boulder County Summary of Reported Data Staged Upgrades - Homeowner-focused Strategies for Encouraging Energy Upgrades over Time STEP Program Benchmark Report

  18. TEC Working Group Topic Groups Routing

    Broader source: Energy.gov [DOE]

    The Routing Topic Group has been established to examine topics of interest and relevance concerning routing of shipments of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to a...

  19. Energy & Manufacturing Workforce Training Topics List - Version...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Manufacturing Workforce Training Topics List - Version 1.7 (02.11.14) Energy & Manufacturing Workforce Training Topics List - Version 1.7 (02.11.14) View this searchable list of ...

  20. Presentation: QER Energy Topics | Department of Energy

    Energy Savers [EERE]

    QER Energy Topics Presentation: QER Energy Topics A briefing to the Secretary's Energy Advisory Board on QER Energy Topics (Energy Flows, Water Flows, and Program for Climate Model Diagnosis and Intercomparison) prepared by: A.J. Simon, Lawrence Livermore National Laboratory PDF icon QER Energy Topics More Documents & Publications Presentation: High Performance Computing Applications Computational Advances in Applied Energy December 3, 2013 SEAB Meeting Minutes

  1. WTP Safety Culture Advice Joint Topic (HSEP/TWC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 2012 v1 Page 1 of 2 Note: The views expressed in committee meetings should not be considered a substitute for full HAB consensus on any particular issue. WTP Safety Culture Advice Joint Topic (HSEP/TWC) Framing questions for discussion regarding DOE's recently released Implementation Plan: Re: Secretary Chu's response to the DNFSB with the Implementation Plan for Recommendation 2011-1 (December 27, 2011) Note: The ORP coordinator for the DOE Response to DNFSB 2011-1 is Steve Pfaff. o

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    One project >100M achieved CD-2 in 1 st qtr FY09. 5. TRA Use: By end of FY11, 80% of projects >750M will implement TRA no later than CD-2. 50% - No projects >750 M achieved ...

  3. Topic Area 1: Technology Demonstration Projects | Open Energy...

    Open Energy Info (EERE)

    Source Heat Pumps Nashville, TN 1,800,000 1,800,000 3,600,000 New School & Performing Arts Theater Pennsylvania 1001 South 15th Street Associates, LLC Recovery Act - Geothermal...

  4. Activities of the Oil Implementation Task Force, December 1990--February 1991; Contracts for field projects and supporting research on enhanced oil recovery, April--June 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. )

    1991-03-01

    The Oil Implementation Task Force was appointed to implement the US DOE's new oil research program directed toward increasing domestic oil production by expanded research on near- or mid-term enhanced oil recovery methods. An added priority is to preserve access to reservoirs that have the largest potential for oil recovery, but that are threatened by the large number of wells abandoned each year. This report describes the progress of research activities in the following areas: chemical flooding; gas displacement; thermal recovery; resource assessment; microbial technology; geoscience technology; and environmental technology. (CK)

  5. Implementation Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links BPA Energy Efficiency Plan BPA Post-2011 EE Role Implementation Manual Archives IM Document Library Interim Solution 2.0 Files Low Income Efficiency...

  6. Tracking topic birth and death in LDA.

    SciTech Connect (OSTI)

    Wilson, Andrew T.; Robinson, David Gerald

    2011-09-01

    Most topic modeling algorithms that address the evolution of documents over time use the same number of topics at all times. This obscures the common occurrence in the data where new subjects arise and old ones diminish or disappear entirely. We propose an algorithm to model the birth and death of topics within an LDA-like framework. The user selects an initial number of topics, after which new topics are created and retired without further supervision. Our approach also accommodates many of the acceleration and parallelization schemes developed in recent years for standard LDA. In recent years, topic modeling algorithms such as latent semantic analysis (LSA)[17], latent Dirichlet allocation (LDA)[10] and their descendants have offered a powerful way to explore and interrogate corpora far too large for any human to grasp without assistance. Using such algorithms we are able to search for similar documents, model and track the volume of topics over time, search for correlated topics or model them with a hierarchy. Most of these algorithms are intended for use with static corpora where the number of documents and the size of the vocabulary are known in advance. Moreover, almost all current topic modeling algorithms fix the number of topics as one of the input parameters and keep it fixed across the entire corpus. While this is appropriate for static corpora, it becomes a serious handicap when analyzing time-varying data sets where topics come and go as a matter of course. This is doubly true for online algorithms that may not have the option of revising earlier results in light of new data. To be sure, these algorithms will account for changing data one way or another, but without the ability to adapt to structural changes such as entirely new topics they may do so in counterintuitive ways.

  7. LANSCE | Users | LUG | Topical User Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 LANSCE Topical User Meeting | January 9-10 2012 LANSCE Topical User Workshop LANSCE will host the 2012 Topical User Workshop, January 9-10, 2012. We hope to see you there! Registration | Accommodations | Agenda (some presentations are included on the agenda) LANL foreign nationals may register at anytime. | Poster Dimensions: 32 in x 40 in This workshop will solicit user input for the scientific opportunities offered by the pulse stacker and superconducting accelerator that LANSCE has proposed

  8. TEC Working Group Topic Groups Archives Communications

    Broader source: Energy.gov [DOE]

    The Communications Topic Group was convened in April 1998 to improve internal and external strategic level communications regarding DOE shipments of radioactive and other hazardous materials.

  9. TEC Working Group Topic Groups Security

    Broader source: Energy.gov [DOE]

    The Security Topic group is comprised of regulators, law enforcement officials, labor and industry representatives and other subject matter experts concerned with secure transport of spent nuclear...

  10. Collaboration Topics - Visualization | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    NNSACEA Cooperation in Computer Science Collaboration Topics - Visualization ... to visualize large data sets on small computational resources. 3) In situ visualization ...

  11. Interconnection-Wide Transmission Planning Initiative: Topic...

    Energy Savers [EERE]

    the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas ...

  12. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western ...

  13. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern ...

  14. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the ...

  15. Topic Index to the DOE Administrative Records Disposition Schedules...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative...

  16. Preface: Special Topic on Interfacial and Confined Water (Journal...

    Office of Scientific and Technical Information (OSTI)

    Preface: Special Topic on Interfacial and Confined Water Citation Details In-Document Search Title: Preface: Special Topic on Interfacial and Confined Water This Special Topic on...

  17. Webtrends Archives by Fiscal Year - Topic Landing Pages | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topic Landing Pages Webtrends Archives by Fiscal Year - Topic Landing Pages From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the topic landing pages by ...

  18. Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. )

    1991-05-01

    The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selected deltaic plays. Enhanced recovery processes include chemical floodings, gas displacement, thermal recovery, geoscience, and microbial recovery.

  19. TEC Working Group Topic Groups Archives Protocols

    Broader source: Energy.gov [DOE]

    The Transportation Protocols Topic Group serves as an important vehicle for DOE senior managers to assess and incorporate stakeholder input into the protocols process. The Topic Group was formed to review a series of transportation protocols developed in response to a request for DOE to be more consistent in its approach to transportation.

  20. Step 3: Project Refinement

    Energy Savers [EERE]

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  1. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group PDF icon May 17, 2007 PDF icon January 16, 2007 PDF icon...

  2. Mentors and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentors, Projects Mentors and Projects Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational, collaborative atmosphere Contacts Director Misa Cowee Email Administrative Assistant Mary Wubbena Email Request more information Email Students work closely with their mentors, who are Laboratory scientists, on challenging research projects in the Space Weather Summer School. Projects are related to current research topics in space

  3. Supplemental Information for Fiscal Year 2017 Project Prioritization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Information for Fiscal Year 2017 Project Prioritization Supplemental Information for Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided ...

  4. Georgia-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    Projects Jump to: navigation, search Name Georgia-World Bank Climate Projects AgencyCompany Organization World Bank Focus Area Renewable Energy, Hydro Topics Background analysis...

  5. Jonathan Link, Columbia KEK Topical Conference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -22, 2001 Jonathan Link, Columbia KEK Topical Conference Short Baseline Neutrino Oscillations and MiniBooNE Jonathan Link Columbia University The 5 th KEK Topical Conference - Frontiers in Flavor Physics November 20-22, 2001 November 20-22, 2001 Jonathan Link, Columbia KEK Topical Conference Outline 1. Background on Short Baseline Neutrino Oscillations * A little neutrino physics * The LSND oscillation result 2. About MiniBooNE 3. Status of MiniBooNE. Some of you may have noticed that I'll be

  6. Implementing Best Practices for Data Quality Assessment of the National Renewable Energy Laboratory?s Solar Resource and Meteorological Assessment Project: Preprint

    SciTech Connect (OSTI)

    Wilcox, S. M.; McCormack, P.

    2011-04-01

    Effective solar radiation measurements for research and economic analyses require a strict protocol for maintenance, calibration, and documentation to minimize station downtime and data corruption. The National Renewable Energy Laboratory's Concentrating Solar Power: Best Practices Handbook for the Collection and Use of Solar Resource Data includes guidelines for operating a solar measurement station. This paper describes a suite of automated and semi-automated routines based on the best practices handbook as developed for the National Renewable Energy Laboratory Solar Resource and Meteorological Assessment Project. These routines allow efficient inspection and data flagging to alert operators of conditions that require immediate attention. Although the handbook is targeted for concentrating solar power applications, the quality-assessment procedures described are generic and should benefit many solar measurement applications. The routines use data in one-minute measurement resolution, as suggested by the handbook, but they could be modified for other time scales.

  7. Funding for IGPPS Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    which may, in certain circumstances, require several months to implement after the start of the fiscal year. For all projects supported with Los Alamos National Laboratory...

  8. TEC Working Group Topic Groups Rail

    Broader source: Energy.gov [DOE]

    The Rail Topic Group has the responsibility to identify and discuss current issues and concerns regarding rail transportation of radioactive materials by the Department of Energy (DOE). The group’s...

  9. TEC Working Group Topic Groups Tribal

    Broader source: Energy.gov [DOE]

    The Tribal Topic Group was established in January 1998 to address government-to-government consultation between DOE and Indian Tribes affected by its transportation activities. The group focuses on...

  10. Freescale Semiconductor Successfully Implements an Energy Management...

    Broader source: Energy.gov (indexed) [DOE]

    This case study describes how Freescale Semiconductor implemented projects at its Oak Hill Fab plant in Austin, Texas, that reduced annual plant-wide energy consumption by 28 ...

  11. End Point Implementation Examples | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon End Point Implementation Examples More Documents & Publications Post-Deactivation Surveillance and Maintenance Planning Project Management Plan Examples 1 - 80 ...

  12. Step 2: Project Options

    Energy Savers [EERE]

    2: Project Options 2 2 Design 1 Potential 3 Refinement 4 Implementation 2 Options 5 Operations & Maintenance 1/28/2016 2 Presentation Agenda * Step 2: Project Options * Project members and roles * Activity * Project ownership options - Interconnection, net metering, permitting, and considerations * Tools * Case in Point 3 Potential Options Refinement Implementation Operations & Maintenance 4 Step 2: Roles, Business Structures, & Regulatory Considerations Purpose: Determine ownership

  13. TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic

    Office of Environmental Management (EM)

    Group | Department of Energy Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group PDF icon May 17, 2007 PDF icon January 16, 2007 PDF icon August 31, 2006 PDF icon July 27, 2006 PDF icon June 8, 2006 PDF icon April 20, 2006 PDF icon March 9, 2006 PDF icon January 26, 2006 PDF icon November 9, 2005 PDF icon September 15, 2005 PDF icon April 28, 2005 PDF icon March 24, 2005 PDF icon February 24, 2005 PDF icon January 27,

  14. Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

    SciTech Connect (OSTI)

    Albrecht, Linda; Wilkerson, Laura; Skinner, Ralph; Birchfield, Joseph W. III

    2012-07-01

    The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

  15. Physics Topics - Plasma Couette Experiment - Cary Forest Group...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Topics UW Madison Plasma Couette Experiment Physics Topics PCX HomeResearch MissionPhysics TopicsDeviceDiagnosticsContacts LinksPCX People CPLA Home Directory Publications ...

  16. Physics Topics - Rotating Wall Machine - UW Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Topics UW Madison Line Tied Reconnection Experiment Physics Topics LTRX HomeResearch MissionLTRX DevicePhysics TopicsDiagnosticsLTRX GalleryLTRX People CPLA Home Directory ...

  17. Report: Small Business, Acquisition, and Project Management

    Office of Environmental Management (EM)

    SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT Background In FY 2007 EMAB was tasked to dialogue with the Office of Acquisition and Project Management (EM-50) on the topic of ...

  18. Webtrends Archives by Fiscal Year - Topic Landing Pages | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Topic Landing Pages Webtrends Archives by Fiscal Year - Topic Landing Pages From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the topic landing pages by fiscal year. Microsoft Office document icon Topic Landing Pages FY10 Microsoft Office document icon Topic Landing Pages FY11 PDF icon Topic Landing Pages FY12-FY13 More Documents & Publications Webtrends Archives by Fiscal Year - Commercialization Webtrends Archives by Fiscal Year - Social Media Site

  19. Quark-gluon plasma (Selected Topics)

    SciTech Connect (OSTI)

    Zakharov, V. I.

    2012-09-15

    Introductory lectures to the theory of (strongly interacting) quark-gluon plasma given at the Winter School of Physics of ITEP (Moscow, February 2010). We emphasize theoretical issues highlighted by the discovery of the low viscosity of the plasma. The topics include relativistic hydrodynamics, manifestations of chiral anomaly in hydrodynamics, superfluidity, relativistic superfluid hydrodynamics, effective stringy scalars, holographic models of Yang-Mills theories.

  20. Manufacturing Innovation Multi-Topic Workshop Report

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) and Department of Defense (DoD) held a Manufacturing Innovation Topics Workshop on October 8 and 9, 2014. Representatives from industry, academia, DOE national laboratories, and DoD centers gathered in Fort Worth TX to hear keynote addresses and participate in workshop breakout sessions.

  1. Property:DIA/Topic | Open Energy Information

    Open Energy Info (EERE)

    + Environmental +, Economic + Evaluating the Impact of Development Projects on Poverty: A Handbook for Practitioners + Economic +, Social + (previous 25) (next 25)...

  2. Implementation Plan Synopsis Directive Number, Title Summary of Implementation Plan:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services » Earned Value Management » Implemenation Guidance Implemenation Guidance Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments on a project or task. Following established implementation guidelines and conducting periodic surveillance of implemented EVM System (EVMS) will ensure that both the government and contractors have the ability to examine detailed schedule information, critical

  3. Funding Topics for Small Business Innovation Research and Small...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topics for Small Business Innovation Research and Small Business Technology Transfer Programs Funding Topics for Small Business Innovation Research and Small Business Technology ...

  4. Events & Topics in Renewable Energy & the Environment | Photosynthetic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events & Topics in Renewable Energy & the Environment Events & Topics in Renewable Energy & the Environment Donald Danforth Plant Science Center April 9, 2015 - 3:15pm Donald...

  5. Events & Topics in Renewable Energy & the Environment | Photosynthetic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events & Topics in Renewable Energy & the Environment Events & Topics in Renewable Energy & the Environment MIssouri Botanical Garden | Earthways Center - October 6th, 3:15 -...

  6. Events & Topics in Renewable Energy & the Environment | Photosynthetic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events & Topics in Renewable Energy & the Environment Events & Topics in Renewable Energy & the Environment Tyson Living Learning Center tour November 18, 2014 - 4:00pm Tyson...

  7. List of Topics for Interagency Performance & Risk Assessment...

    Energy Savers [EERE]

    List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion List of Topics for Interagency Performance & Risk Assessment Community of ...

  8. Public Perception of 13 Different Energy Topics analyzed in new...

    Open Energy Info (EERE)

    and unfavorability energy topics such as transportation, renewable technology, nuclear, clean coal, and smart grid topics. Some of the highlights of the study are as...

  9. Microsoft Word - 20111012_RAP Dec_Mtg_Topics.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12 Potential December RAP Committee Meeting Agenda Topics TopicPurpose (incl. any framing questions) 2012 Priority? Issue Managers (* denotes lead) Agency Lead (s) Time...

  10. TEC Working Group Topic Groups Routing Key Documents | Department...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Routing Key Documents KEY DOCUMENTS PDF icon Proposed Task Plan - Routing Topic Group More Documents & Publications TEC Working Group...

  11. TEC Working Group Topic Groups Routing Meeting Summaries | Department...

    Office of Environmental Management (EM)

    Routing Meeting Summaries TEC Working Group Topic Groups Routing Meeting Summaries MEETING SUMMARIES PDF icon Atlanta TEC Meeting, Routing Topic Group Summary More Documents &...

  12. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Rail Conference Call Summaries TEC Working Group Topic Groups Rail Conference Call Summaries CONFERENCE CALL SUMMARIES Rail Topic Group Inspections Subgroup Planning Subgroup...

  13. TEC Working Group Topic Groups Archives Protocols Meeting Summaries...

    Office of Environmental Management (EM)

    Protocols Meeting Summaries TEC Working Group Topic Groups Archives Protocols Meeting Summaries Meeting Summaries PDF icon Philadelphia TEC Meeting, Protocols Topic Group Summary -...

  14. TEC Working Group Topic Groups Rail Meeting Summaries | Department...

    Office of Environmental Management (EM)

    TEC Working Group Topic Groups Rail Meeting Summaries MEETING SUMMARIES PDF icon Kansas City TEC Meeting, Rail Topic Group Summary - July 25, 2007 PDF icon Atlanta TEC...

  15. Property:ProgramTopics | Open Energy Information

    Open Energy Info (EERE)

    Policy Design + Implementation +, Policiesdeployment programs + A Report on Worldwide Hydrogen Bus Demonstrations, 2002-2007 + Analysis Tools + A Review of HOV Lane Performance...

  16. TEC/WG Tribal Topic Group

    Office of Environmental Management (EM)

    Transportation Program November 2001 Tribal Partnering Workshop, the DOE Indian Policy Implementation Plan, ... of the ongoing budget and organizational discussions at the Department. ...

  17. Southern Idaho Wildlife Mitigation Implementation 2000 Annual Report.

    SciTech Connect (OSTI)

    Bottum, Edward; Mikkelsen, Anders

    2001-03-01

    This report covers calendar year 2000 activities for the Southern Idaho Wildlife Mitigation Implementation project. This project, implemented by Idaho Department of Fish and Game and Shoshone Bannock Tribes wildlife mitigation staff, is designed to protect, enhance and maintain wildlife habitats to mitigate construction losses for Palisades, Anderson Ranch, Black Canyon and Minidoka hydroelectric projects. Additional project information is available in the quarterly reports.

  18. Southern idaho Wildlife Mitigation Implementation 1999 Annual Report.

    SciTech Connect (OSTI)

    Bottum, Edward; Mikkelsen, Anders

    2000-04-01

    This report is for the Southern Idaho Wildlife Mitigation Implementation project. This project, implemented by IDFG and SBT wildlife mitigation staff, is designed to protect, enhance and maintain wildlife habitats to mitigate construction losses for Palisades, Anderson Ranch, Black Canyon and Minidoka hydroelectric projects. Additional project information is available in the quarterly reports.

  19. Park Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History » Manhattan Project National Historical Park » Park Implementation Park Implementation NPS Director Jonathan Jarvis and Secretary of Energy Ernest Moniz Stay up to date on progress towards our nation's newest national park. February 11-12, 2016 NPS and DOE participants in the Foundation Workshops meet in Denver, Colorado, to assess the workshop findings, develop interpretive themes for the park, and discuss next steps. February 1-9, 2016 The NPS in coordination with DOE holds

  20. More About "Topic A" and "Topic B" Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More About "Topic A" and "Topic B" Awards More About "Topic A" and "Topic B" Awards The awards pursuant to the Department of Energy's Interconnection-wide Transmission Planning Initiative cover two broad topics. "Topic A" covers Interconnection-Level Analysis and Planning. "Topic B" covers Cooperation Among States on Electric Resource Planning and Priorities, where the states will develop input to the Topic A analyses and perform other

  1. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  2. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  3. GEO-SEQ Best Practices Manual. Geologic Carbon Dioxide Sequestration: Site Evaluation to Implementation

    SciTech Connect (OSTI)

    Benson, Sally M.; Myer, Larry R.; Oldenburg, Curtis M.; Doughty, Christine A.; Pruess, Karsten; Lewicki, Jennifer; Hoversten, Mike; Gasperikova, Erica; Daley, Thomas; Majer, Ernie; Lippmann, Marcelo; Tsang, Chin-Fu; Knauss, Kevin; Johnson, James; Foxall, William; Ramirez, Abe; Newmark, Robin; Cole, David; Phelps, Tommy J.; Parker, J.; Palumbo, A.; Horita, J.; Fisher, S.; Moline, Gerry; Orr, Lynn; Kovscek, Tony; Jessen, K.; Wang, Y.; Zhu, J.; Cakici, M.; Hovorka, Susan; Holtz, Mark; Sakurai, Shinichi; Gunter, Bill; Law, David; van der Meer, Bert

    2004-10-23

    The first phase of the GEO-SEQ project was a multidisciplinary effort focused on investigating ways to lower the cost and risk of geologic carbon sequestration. Through our research in the GEO-SEQ project, we have produced results that may be of interest to the wider geologic carbon sequestration community. However, much of the knowledge developed in GEO-SEQ is not easily accessible because it is dispersed in the peer-reviewed literature and conference proceedings in individual papers on specific topics. The purpose of this report is to present key GEO-SEQ findings relevant to the practical implementation of geologic carbon sequestration in the form of a Best Practices Manual. Because our work in GEO-SEQ focused on the characterization and project development aspects, the scope of this report covers practices prior to injection, referred to as the design phase. The design phase encompasses activities such as selecting sites for which enhanced recovery may be possible, evaluating CO{sub 2} capacity and sequestration feasibility, and designing and evaluating monitoring approaches. Through this Best Practices Manual, we have endeavored to place our GEO-SEQ findings in a practical context and format that will be useful to readers interested in project implementation. The overall objective of this Manual is to facilitate putting the findings of the GEO-SEQ project into practice.

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0% One project >100M achieved CD-2 in 3rd qtr FY09. 5. TRA Use: By end of FY11, 80% of projects >750M will implement TRA no later than CD-2. 50% 0% No projects >750M achieved ...

  5. Topic A Awardee: Eastern Interconnection Planning Collaborative |

    Energy Savers [EERE]

    Department of Energy Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based,

  6. TEC/WG Tribal Topic Group

    Office of Environmental Management (EM)

    Meeting September 22, 2005 - Pueblo, CO Group Chair: Jay Jones (DOE/OCRWM) Tribal Topic Group Members Present: Richard Arnold (Southern Paiute/CGTO), Vicki Best (Bechtel SAIC-YMP), Kevin Blackwell (DOT/FRA), Sandra Covi (UPRR), Barbara Durham (Timbisha Shoshone Tribe), Greg Fasano (Bechtel SAIC-YMP), Elizabeth Helvey (BSC), Angela Hill (DOE/OCRWM), Judith Holm (DOE/OCRWM), Marsha Keister (INL), Dan King (Oneida Nation), Gary Lanthrum (DOE/OCRWM), Corinne Macaluso (DOE/OCRWM), Calvin Meyers

  7. Measuring Performance and Benchmarking Project Management

    Energy Savers [EERE]

    implemented. Monthly 4. Project management staffing Is project staffing adequate in terms of number and qualifications? Assessment scale from 1 (poor) to 5 (excellent)....

  8. Secretarial Memorandum on Integrating Project Management with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve ... implementation of DOE programs and projects," the Secretary has signed a memorandum ...

  9. Additional EIPC Study Analysis: Interim Report on High Priority Topics

    SciTech Connect (OSTI)

    Hadley, Stanton W

    2013-11-01

    Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.

  10. TEC Working Group Topic Groups | Department of Energy

    Energy Savers [EERE]

    Topic Groups TEC Working Group Topic Groups TEC Topic Groups were formed in 1991 following an evaluation of the TEC program. Interested members, DOE and other federal agency staff meet to examine specific issues related to radioactive materials transportation. TEC Topic Groups enable a small number of participants to focus intensively on key issues at a level of detail that is unattainable during the TEC semiannual meetings due to time and group size constraints. Topic Groups meet individually

  11. Manhattan Project: Places

    Office of Scientific and Technical Information (OSTI)

    Places "Met Lab" (Metallurgical Laboratory) Oak Ridge: Clinton Engineer Works Hanford Engineer Works Los Alamos Other Places Places of the Manhattan Project Places PLEASE NOTE: The Places pages are not yet available. Links to the pages listed below and to the left will be activated as content is developed. Select topics relating to the places where the Manhattan Project occurred have been grouped into the categories listed to the left. A quick overview of places involved in the

  12. December 4, 2008; HSS/Union Working Group Meeting on 2008 HSS/Union Topical Wrap Up - PRIORITY NEAR-TERM ACTION OVERVIEW

    Energy Savers [EERE]

    Topical Wrap-Up Meeting December 4, 2008 PRIORITY NEAR-TERM ACTION OVERVIEW Background: Union representatives who participated in the initial 2007 HSS Focus Group meetings agreed to a path forward in which various unions combined to form working groups to address union identified health and safety issues by topical area. 2008 meetings were held to specifically address the topical areas of interest and concern related to worker health and safety at DOE sites: Training, 851 Rule Implementation,

  13. Project Reports for Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  14. Preface to Special Topic: Marine Renewable Energy

    SciTech Connect (OSTI)

    Pinto, F. T.; Iglesias, G.; Santos, P. R.; Deng, Zhiqun

    2015-12-30

    Marine renewable energy (MRE) is generates from waves, currents, tides, and thermal resources in the ocean. MRE has been identified as a potential commercial-scale source of renewable energy. This special topic presents a compilation of works selected from the 3rd IAHR Europe Congress, held in Porto, Portugal, in 2014. It covers different subjects relevant to MRE, including resource assessment, marine energy sector policies, energy source comparisons based on levelized cost, proof-of-concept and new-technology development for wave and tidal energy exploitation, and assessment of possible inference between wave energy converters (WEC).

  15. TEC/WG Tribal Topic Group

    Office of Environmental Management (EM)

    April 4, 2005 - Phoenix, AZ Group Chair: Jay Jones (DOE/OCRWM) Tribal Topic Group Members Present: Nancy Bennett (UNM/ATRI), Kevin Blackwell (DOT/FRA), Kristen Ellis (DOE/CI), Ed Gonzales (ELG), Elizabeth Helvey (BSC), Jeff Hepting (Pueblo of Acoma), Robert Holden (NCAI), Judith Holm (DOE/OCRWM), Dan King (Oneida Nation), Gary Lanthrum (DOE/OCRWM), Bob Lupton (DOE/ORD/IR), Corinne Macaluso (DOE/OCRWM), Ellen Ott (DOE/GC), Jennifer Patric (BAH), Stanley Paytiamo (Pueblo of Acoma), Wilda Portner

  16. Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  17. Distributed generation implementation guidelines

    SciTech Connect (OSTI)

    Guzy, L.; O`Sullivan, J.B.; Jacobs, K.; Major, W.

    1999-11-01

    The overall economics of a distributed generation project is based on cost elements which include: Equipment and financing, fuel, displaced electricity cost, operation and maintenance. Of critical importance is how the facility is managed, including adequate provision for a comprehensive operator training program. Proper equipment maintenance and fuel procurement policy will also lead to greater system availability and optimal system economics. Various utility tariffs are available which may be economically attractive, with an added benefit to the utility of providing a peak shaving resource during peak periods. Changing modes of operation of the distributed generation system may affect staff readiness, require retraining and could affect maintenance costs. The degree of control and oversight that is provided during a project`s implementation and construction phases will impact subsequent maintenance and operating costs. The long term effect of siting impacts, such as building facades that restrict turbine inlet airflow will affect subsequent operations and require supplemental maintenance action. It is possible to site a variety of distributed generation technologies in settings which vary from urban to remote unattended locations with successful results from both an economic and operational perspective.

  18. Energy & Manufacturing Workforce Training Topics List - Version 1.7

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (02.11.14) | Department of Energy & Manufacturing Workforce Training Topics List - Version 1.7 (02.11.14) Energy & Manufacturing Workforce Training Topics List - Version 1.7 (02.11.14) View this searchable list of the training programs in the areas of energy and/or manufacturing. Information provided in this list includes: the subjects being taught, grantee, project title, and state. In some cases the list also shows the certificates provided by the courses. File Energy and

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDRI will be documented in future EIRs. (733) 5. TRA Use: By end of FY11, 80% of projects >750M will implement TRA no later than CD-2. Establish Baseline 8% Baseline established. ...

  20. India-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    Name India-World Bank Climate Projects AgencyCompany Organization World Bank Sector Energy, Land Focus Area Energy Efficiency, Renewable Energy Topics Background analysis...

  1. Philippines-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    Philippines-World Bank Climate Projects AgencyCompany Organization World Bank Sector Energy, Land Focus Area Renewable Energy, Energy Efficiency, Geothermal Topics Background...

  2. Hot Topics Workshop - February 2015 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center - February 2015 Hot Topics Workshop - February 2015 Shots from our Hot Topics Workshop: Energy and the Environment for Secondary Science Teachers. Original Event Info found here

  3. SBIR and STTR: Topics, FY 2015 Phase I Release 2

    Broader source: Energy.gov [DOE]

    Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Programs: Topics, FY 2015, Phase I, Release 2.

  4. TEC Working Group Topic Groups Archives Communications Meeting Summaries |

    Office of Environmental Management (EM)

    Department of Energy Archives Communications Meeting Summaries TEC Working Group Topic Groups Archives Communications Meeting Summaries Meeting Summaries PDF icon Milwaukee TEC Meeting, Communications Topic Group Summary - July 1998 PDF icon Inaugural Group Meeting - April 1998 More Documents & Publications TEC Working Group Topic Groups Archives Communications Conference Call Summaries TEC Meeting Summaries - January 1997 TEC Working Group Topic Groups Tribal Conference Call

  5. TEC Working Group Topic Groups Rail Conference Call Summaries Inspections

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup PDF icon April 6, 2006 PDF icon February 23, 2006 Draft PDF icon January 24, 2006 More Documents & Publications TEC Working Group Topic Groups Rail Conference Call Summaries Planning Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Tracking Subgroup TEC Working Group Topic Groups Rail Conference Call

  6. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup PDF icon Draft Work Plan - February 4, 2008 More Documents & Publications TEC Working Group Topic Groups Rail Meeting Summaries TEC Working Group Topic Groups Rail Conference Call Summaries Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup

  7. TEC Working Group Topic Groups Archives Protocols Conference Call Summaries

    Office of Environmental Management (EM)

    | Department of Energy Conference Call Summaries TEC Working Group Topic Groups Archives Protocols Conference Call Summaries Conference Call Summaries PDF icon May 13, 1999 PDF icon April 8, 1999 PDF icon March 1, 1999 More Documents & Publications TEC Working Group Topic Groups Archives Protocols Meeting Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries

  8. Understanding and Implementing DOE Quality Requirements and ASME...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in DOE ...

  9. Application of lidar to current atmospheric topics

    SciTech Connect (OSTI)

    Sedlacek, A.J. III

    1996-12-31

    The goal of the conference was to address the various applications of lidar to topics of interest in the atmospheric community. Specifically, with the development of frequency-agile, all solid state laser systems, high-quantum-efficiency detectors, increased computational power along with new and more powerful algorithms, and novel detection schemes, the application of lidar to both old and new problems has expanded. This expansion is evidenced by the contributions to the proceedings, which demonstrate the progress made on a variety of atmospheric remote sensing problems, both theoretically and experimentally. The first session focused on aerosol, ozone, and temperature profile measurements from ground-based units. The second session, Chemical Detection, provided applications of lidar to the detection of atmospheric pollutants. Papers in the third session, Wind and Turbulence Measurements, described the Multi-center Airborne Coherent Atmospheric Wind Sensor (MACAWS) experiments, Doppler techniques for ground-based wind profiling and mesopause radial wind and temperature measurements utilizing a frequency-agile lidar system. The papers in the last two sessions, Recent Advanced in Lidar Technology and Techniques and Advanced Operational Lidars, provided insights into novel approaches, materials, and techniques that would be of value to the lidar community. Papers have been processed separately for inclusion on the data base.

  10. Introduction to LNG vehicle safety. Topical report

    SciTech Connect (OSTI)

    Bratvold, D.; Friedman, D.; Chernoff, H.; Farkhondehpay, D.; Comay, C.

    1994-03-01

    Basic information on the characteristics of liquefied natural gas (LNG) is assembled in this report to provide an overview of safety issues and practices for the use of LNG vehicles. This document is intended for those planning or considering the use of LNG vehicles, including vehicle fleet owners and operators, public transit officials and boards, local fire and safety officials, manufacturers and distributors, and gas industry officials. Safety issues and mitigation measures that should be considered for candidate LNG vehicle projects are addressed.

  11. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Safety Integration - Implementation of Controls Examples Example 24 5 Health & Safety This section describes the work controls associated with the 771/774 Closure Project. As prescribed in DOE Order 440.1, Worker Protection Management for DOE Federal and Contractor Employees, the project must comply with the OSHA construction standards for Hazardous Waste Operations and Emergency Response, 29 CFR 1910.120 and 1926. Under these standards, a Building 771/774 Closure Project-Specific HASP has

  12. Project Reports for Bishop Paiute Tribe - 2015 Project | Department of

    Office of Environmental Management (EM)

    Makah Indian Nation "Next Steps to Implement Pilot Power Project for Pacific Northwest Region" Makah Indian Nation "Next Steps to Implement Pilot Power Project for Pacific Northwest Region" Project Overview Wind Power and Other Generation Wind Resource marginal Other self-generation sources being considered Tribal Utility Development Makah Tribal Utility charter in place Tribal Utility business options being evaluated Self Generation Options Summarize Wind Resource Assessment

  13. Topical Report 5: Sorbent Performance Report

    SciTech Connect (OSTI)

    Krutka, Holly; Sjostrom, Sharon

    2011-05-31

    ADA-ES has completed an extensive sorbent screening program funded primarily through DOE NETL cooperative agreement DE-NT0005649 with support from EPRI and industry cost-share participants. Tests were completed on simulated and actual flue gas. The overall project objective is to address the viability and accelerate development of a solid-based postcombustion CO2 capture technology that can be retrofit to the existing fleet of coal-fired power plants. An important component of the viability assessment was to evaluate the state of development of sorbents and measure key performance characteristics under realistic operating conditions.

  14. Interconnection-Wide Transmission Planning Initiative: Topic A,

    Energy Savers [EERE]

    Interconnection-Level Analysis and Planning | Department of Energy A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. PDF icon Interconnection-Wide Transmission Planning Initiative: Topic A,

  15. 2013 February POTENTIAL COMMITTEE MEETING TOPICS HAB Committee: RAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 3 2013 February POTENTIAL COMMITTEE MEETING TOPICS HAB Committee: RAP Committee meeting: Tuesday, February 12 from 9 a.m. - 4 p.m. Agenda Topic When is HAB input needed? Issue Managers (* = lead) Agency Lead(s) Time to Allocate (minutes) Title: Framing Discussion: Central Plateau Groundwater and Vadose Zone Modeling (JOINT TOPIC W/ TWC) 2013 Priority: Groundwater Modeling Purpose: To hear a report-out from issue managers on their work regarding Central Plateau groundwater and vadose

  16. TEC Working Group Topic Groups Archives Communications Conference Call

    Office of Environmental Management (EM)

    Summaries | Department of Energy Communications Conference Call Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries Conference Call Summaries PDF icon Conference Call Summary April 2000 PDF icon Conference Call Summary February 1999 PDF icon Conference Call Summary November 1998 More Documents & Publications TEC Working Group Topic Groups Archives Communications Meeting Summaries TEC Working Group Topic Groups Tribal Conference Call Summaries TEC

  17. TEC Working Group Topic Groups Archives Training - Medical Training |

    Office of Environmental Management (EM)

    Department of Energy Training - Medical Training TEC Working Group Topic Groups Archives Training - Medical Training The TEC Training and Medical Training Issues Topic Group was formed to address the training issues for emergency responders in the event of a radioactive material transportation incident. The Topic Group first met in 1996 to assist DOE in developing an approach to address radiological emergency response training needs and to avoid redundancy of existing training materials. The

  18. TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY Milwaukee, WI July 1998

    Office of Environmental Management (EM)

    Milwaukee, WI July 1998 The Topic Group is developing a process to identify appropriate Topic Group membership, and will be working on a protocol for identifying and inviting individual tribes to participate he group identified five actions: (1) catalogue tribal transportation issues; (2) identify a level of tribal awareness of DOE transportation issues; (3) examine funding and tribal support; (4) develop a process for Tribal Topic Group membership; and (5) review the best channels to

  19. Manhattan Project: Processes

    Office of Scientific and Technical Information (OSTI)

    Processes Uranium Mining, Milling, and Refining Uranium Isotope Separation Plutonium Production Bomb Design, Development, and Production Bomb Testing and Weapon Effects Processes PLEASE NOTE: The Processes pages are not yet available. Links to the pages listed below and to the left will be activated as content is developed. Select topics relating to the industrial processes of the Manhattan Project have been grouped into the categories listed to the left. A quick overview of processes involved

  20. Small Business Innovation Research Program Topics- October 28, 2013

    Broader source: Energy.gov [DOE]

    This document outlines the topics covered by the 2013-14 SBIR funding opportunity announcement and show the details of how to apply for the program.

  1. Focus Group Meeting (Topical Wrap-Up) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wrap-Up) Focus Group Meeting (Topical Wrap-Up) Meeting Date: December 4, 2008 Meeting ... More Documents & Publications Focus Group Meeting (Activities Status) Focus Group Meeting ...

  2. Focus Group Meeting (Topical Meeting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Inspection Schedule More Documents & Publications Focus Group Meeting (Activities Status) Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up)

  3. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring...

    Office of Environmental Management (EM)

    Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup PDF icon Draft Work Plan - February 4,...

  4. Topic A and B Awardee: Electric Reliability Council of Texas...

    Office of Environmental Management (EM)

    and B Awardee: Electric Reliability Council of Texas Topic A and B Awardee: Electric Reliability Council of Texas The Electric Reliability Council of Texas (ERCOT) manages the flow ...

  5. TEC Working Group Topic Groups Section 180(c) Meeting Summaries...

    Office of Environmental Management (EM)

    Meeting Summaries TEC Working Group Topic Groups Section 180(c) Meeting Summaries Meeting Summaries PDF icon Washington, DC TEC Meeting - 180(c) Group Summary - March 15, 2006 More...

  6. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup PDF icon April 6, 2006 PDF icon February 23,...

  7. TEC Working Group Topic Groups Routing Conference Call Summaries...

    Office of Environmental Management (EM)

    Routing Conference Call Summaries TEC Working Group Topic Groups Routing Conference Call Summaries CONFERENCE CALL SUMMARIES PDF icon January 31, 2008 PDF icon December 6, 2007 PDF...

  8. TEC Working Group Topic Groups Security Meeting Summaries | Department...

    Office of Environmental Management (EM)

    Meeting Summaries TEC Working Group Topic Groups Security Meeting Summaries Meeting Summaries PDF icon Green Bay STG Meeting Summary- September 14, 2006 PDF icon Washington STG...

  9. TEC Working Group Topic Groups Archives Mechanics of Funding...

    Office of Environmental Management (EM)

    Mechanics of Funding and Techical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Techical Assistance Mechanics of Funding and Techical Assistance Items...

  10. TEC Working Group Topic Groups Rail Archived Documents | Department...

    Office of Environmental Management (EM)

    Archived Documents TEC Working Group Topic Groups Rail Archived Documents ARCHIVED DOCUMENTS PDF icon Inspections Summary Matrix PDF icon TEC Transportation Safety WIPP-PIG Rail...

  11. TEC Working Group Topic Groups Tribal Conference Call Summaries...

    Office of Environmental Management (EM)

    Conference Call Summaries TEC Working Group Topic Groups Tribal Conference Call Summaries Conference Call Summaries PDF icon March 12, 2008 PDF icon October 3, 2007 PDF icon...

  12. TEC Working Group Topic Groups Archives Communications Conference...

    Office of Environmental Management (EM)

    Communications Conference Call Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries Conference Call Summaries PDF icon Conference Call Summary...

  13. TEC Working Group Topic Groups Archives Communications Meeting...

    Office of Environmental Management (EM)

    Archives Communications Meeting Summaries TEC Working Group Topic Groups Archives Communications Meeting Summaries Meeting Summaries PDF icon Milwaukee TEC Meeting, Communications...

  14. TEC Working Group Topic Groups Security Conference Call Summaries...

    Office of Environmental Management (EM)

    Security Conference Call Summaries TEC Working Group Topic Groups Security Conference Call Summaries Conference Call Summaries PDF icon August 17, 2006 (Draft) PDF icon July 18,...

  15. TEC Working Group Topic Groups Rail Key Documents | Department...

    Office of Environmental Management (EM)

    Rail Key Documents TEC Working Group Topic Groups Rail Key Documents KEY DOCUMENTS Radiation Monitoring Subgroup Intermodal Subgroup Planning Subgroup PDF icon Current FRA State...

  16. TEC Working Group Topic Groups Rail Key Documents Intermodal...

    Office of Environmental Management (EM)

    Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup PDF icon Draft Work Plan More Documents & Publications TEC Working...

  17. AMO Requests Technical Topics Suitable for a Manufacturing Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation Institute AMO Requests Technical Topics Suitable for a Manufacturing Innovation Institute April 17, 2014 - 12:23pm Addthis The Advanced Manufacturing Office...

  18. Microsoft PowerPoint - Chairs Round Robin Presentation- Topics...

    Energy Savers [EERE]

    April 22, 2015 www.energy.govEM 2 Savannah River Citizens' Advisory Board Topic: * Liquid ... Board Issues: * Waste Isolation Pilot Plant (WIPP): The status of recovery efforts ...

  19. Microsoft Word - Tribal Topic Group Summary March 06 final _3...

    Office of Environmental Management (EM)

    TEC Tribal Topic Group Meeting Tuesday, March 14, 2006 Washington, DC Participants: Jay Jones, Department of Energy (DOE)Office of Civilian Radioactive Waste Management (OCRWM),...

  20. Topic B Awardee: Eastern Interconnection States' Planning Council...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is ...

  1. Events & Topics in Renewable Energy & the Environment | Photosynthetic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technologies campus, followed by a brief presentation. Topics will include home automation, the internet of things, wireless sensor networks and other smart technologies. The...

  2. TEC Working Group Topic Groups Tribal Meeting Summaries | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tribal Meeting Summaries TEC Working Group Topic Groups Tribal Meeting Summaries Meeting Summaries PDF icon Kansas City TEC Meeting - Tribal Group Summary - July 25, 2007 PDF icon ...

  3. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for

    Energy Savers [EERE]

    Acquisition and Project Management, Environmental Management | Department of Energy EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Presentation Topics EM Funding Evolution of EM Contracts EM Portfolio Project Success PDF icon Workshop 2015 -Jack Surash_EM Projects Perspective.pdf

  4. Gasification Studies Task 4 Topical Report

    SciTech Connect (OSTI)

    Whitty, Kevin; Fletcher, Thomas; Pugmire, Ronald; Smith, Philip; Sutherland, James; Thornock, Jeremy; Boshayeshi, Babak; Hunsacker, Isaac; Lewis, Aaron; Waind, Travis; Kelly, Kerry

    2014-02-01

    A key objective of the Task 4 activities has been to develop simulation tools to support development, troubleshooting and optimization of pressurized entrained-flow coal gasifiers. The overall gasifier models (Subtask 4.1) combine submodels for fluid flow (Subtask 4.2) and heat transfer (Subtask 4.3) with fundamental understanding of the chemical processes (Subtask 4.4) processes that take place as coal particles are converted to synthesis gas and slag. However, it is important to be able to compare predictions from the models against data obtained from actual operating coal gasifiers, and Subtask 4.6 aims to provide an accessible, non-proprietary system, which can be operated over a wide range of conditions to provide well-characterized data for model validation. Highlights of this work include: • Verification and validation activities performed with the Arches coal gasification simulation tool on experimental data from the CANMET gasifier (Subtask 4.1). • The simulation of multiphase reacting flows with coal particles including detailed gas-phase chemistry calculations using an extension of the one-dimensional turbulence model’s capability (Subtask 4.2). • The demonstration and implementation of the Reverse Monte Carlo ray tracing (RMCRT) radiation algorithm in the ARCHES code (Subtask 4.3). • Determination of steam and CO{sub 2} gasification kinetics of bituminous coal chars at high temperature and elevated pressure under entrained-flow conditions (Subtask 4.4). In addition, attempts were made to gain insight into the chemical structure differences between young and mature coal soot, but both NMR and TEM characterization efforts were hampered by the highly reacted nature of the soot. • The development, operation, and demonstration of in-situ gas phase measurements from the University of Utah’s pilot-scale entrained-flow coal gasifier (EFG) (Subtask 4.6). This subtask aimed at acquiring predictable, consistent performance and characterizing the environment within the gasifier.

  5. Oracle accrual plans from requirements to implementation

    SciTech Connect (OSTI)

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  6. Project Reports for Quinault Indian Nation - 2011 Project | Department of

    Energy Savers [EERE]

    Energy 11 Project Project Reports for Quinault Indian Nation - 2011 Project The Quinault Indian Nation (QIN) will develop a comprehensive biomass strategy that includes an implementation plan. Learn more about this project or find details in the below status reports. PDF icon November 2011 status report PDF icon November 2012 status report PDF icon March 2014 status report PDF icon Final report More Documents & Publications Biomass Renewable Energy Opportunities and Strategies Forum 2012

  7. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  8. SILICON CARBIDE JOINING. FINAL TOPICAL REPORT

    SciTech Connect (OSTI)

    1998-10-01

    Future energy systems will be required to fire lower-grade fuels and meet higher energy conversion efficiencies than today's systems. The steam cycle used at present is limited to a maximum temperature of 550 C because above that, the stainless steel tubes deform and corrode excessively. To boost efficiency significantly, much higher working fluid temperatures are required. Although high-temperature alloys will suffice for the construction of these components in the near term, the greatest efficiency increases can be reached only with the use of advanced structural ceramics such as silicon carbide (SiC). However, SiC does not melt, but instead sublimes at temperatures over 2000 C. Therefore, it is not possible to join pieces of it through welding, and most brazing compounds have much lower melting points, so the joints lose strength at temperatures much lower than the maximum use temperature of the SiC. Since larger objects such as heat exchangers cannot be easily created from smaller ceramic pieces, the size of the SiC structures that can presently be manufactured are limited by the size of the sintering furnaces (approximately 10 feet for sintered alpha SiC). In addition, repair of the objects will require the use of field-joining techniques. Some success has been had by causing silicon and carbon to react at 1400--1500 C to form SiC in a joint (Rabin, 1995), but these joints contain continuous channels of unreacted silicon, which cause the joints to corrode and creep excessively at temperatures below 1260 C (Breder and Parten, 1996). The objective of this work conducted at the Energy & Environmental Research Center (EERC) is to develop a patentable technique for joining large SiC structures in the field. The key to developing a successful technique will be the use of reactive joining compounds to lower the joining temperature without leaving continuous channels of unreacted compounds that can weaken the joint at temperatures below 1260 C or serve as conduits for transport of corrodents. In addition, the method of heating the joint to cause the reaction bonding must be applicable to structures that are large in two dimensions, which precludes the use of furnaces for heating the samples. Special efforts will be made in this project to transfer the developed technologies to the materials industry via licensing agreements through the EERC Foundation.

  9. Safeguards and Security for Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-15

    This Guide addresses the implementation steps for achieving safeguards and security systems that support the Department's projection objectives.

  10. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Broader source: Energy.gov [DOE]

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  11. OpenSHMEM and Related Technologies. Experiences, Implementations, and Tools

    SciTech Connect (OSTI)

    Shamis, Pavel; Poole, Stephen W; Hernandez, Oscar R

    2014-01-01

    This book constitutes the proceedings of the First OpenSHMEM Workshop, held in Annapolis, MD, USA, in March 2014. The 12 technical papers and 2 short position papers presented in this book were carefully reviewed and selected from 16 submissions. They are organized in topical sections named: OpenSHMEM implementations and evaluations; applications; tools; and OpenSHMEM extensions and future directions.

  12. Borrego springs microgrid demonstration project (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    demonstration project SDG&E has been developing and implementing the foundation for its Smart Grid platform for three decades - beginning with its innovations in automation and...

  13. Federal Renewable Energy Projects and Technologies

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides resources and tools that help federal agencies implement renewable energy projects and technologies to meet federal laws and requirements.

  14. PROJECT REPORTS FOR Alaska Native Tribal Health Consortium- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The main objective of the proposed project is to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit.

  15. Project Reports for Alaska Native Tribal Health Consortium- 2011 Project

    Broader source: Energy.gov [DOE]

    The main objective of the proposed project is to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit.

  16. Analysis & Projections - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Analysis & Projections Glossary › FAQS › Overview Projection Data Monthly short-term forecasts to 2016 Annual projections to 2040 International projections All projections reports Analysis & Projections Major Topics Most popular Annual Energy Outlook related Congressional & other requests International Energy Outlook related Presentations Recurring Short-Term Outlook Related Special outlooks Testimony All reports Browse by Tag Alphabetical Frequency Tag Cloud Current Issues &

  17. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE Acquisition and Project Management (APM) Workshop Presentations 2015 DOE Acquisition and Project Management (APM) Workshop Presentations Time Presenter Topic Day 1 0820 Paul Bosco, Director, Office of Acquisition and Project Management Project Management Perspective 1000 Stephen Meador, Director, Office of Project Assessments, Science SC Projects Perspective 1400 David Kester, Defense Contract Management Agency EVMS - FROM DATA TO DIAGNOSIS - A DoD Perspective 1500

  18. Hot Topics Workshop-Summer 2014 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshop-Summer 2014 Hot Topics Workshop-Summer 2014 Teachers from St. Louis area schools were welcomed to Washington University in St. Louis to learn about new, exciting classroom activities centered around Solar, Wind, and Biomass energy.

  19. CANCELED - Events & Topics in Renewable Energy & the Environment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environment CANCELED - Events & Topics in Renewable Energy & the Environment Midwest Biodiesel Products LLC November 3, 2015 - 4:00pm Please join us for a tour of the Midwest...

  20. EAC Presentation (March 10, 2011): Potential Study Topics | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    or whether it should limit itself to providing recommendations to DOE about how the topic should be framed and analyzed by the national laboratories or other parties. PDF icon...

  1. TEC Working Group Topic Groups Security Key Documents | Department...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Security Key Documents Key Documents PDF icon Security TG Work Plan August 7, 2006 PDF icon Security Lessons Learned Document August 2,...

  2. Proposed Work Scope for the Rail Topic Group

    Office of Environmental Management (EM)

    (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and ... or as necessary, reporting back to the full RTG on the bimonthly calls and at meetings. ...

  3. Project Final Report: HPC-Colony II

    SciTech Connect (OSTI)

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  4. Topics: Determining the Beta Limit - MST - UW Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Determining the Beta Limit UW Madison Madison Symmetric Torus Topics: Determining the Beta Limit MST HomeGraduate Student InformationLinksTourControl and Auxiliary SystemsPhysics TopicsDeviceResearch MissionMST People mst logo CPLA Home Directory Publications Links Internal University of Wisconsin Physics Department Research funding includes support from: Department of Energy National Science Foundation One of the reasons improved confinement in MST can be described as "tokamak-like"

  5. Events & Topics in Renewable Energy & the Environment | Photosynthetic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Antenna Research Center Events & Topics in Renewable Energy & the Environment Events & Topics in Renewable Energy & the Environment Missouri Botanical Garden- EarthWays Center October 6, 2015 - 4:00pm How "green" are you? Join us as we experience a sustainability-themed visit to the Missouri Botanical Garden led by a representative from the EarthWays Center, including an interpretive tour that illustrates the importance of waste minimization, energy, energy

  6. Topical Collaboration "Neutrinos and Nucleosynthesis in Hot and Dense Matter"

    SciTech Connect (OSTI)

    Allahverdi, Rouzbeh

    2015-09-18

    This is the final technical report describing contributions from the University of New Mexico to Topical Collaboration on "Neutrinos and Nucleosynthesis in Hot and Dense Matter" in the period June 2010 through May 2015. During the funding period, the University of New Mexico successfully hired Huaiyu Duan as a new faculty member with the support from DOE, who has contributed to the Topical Collaboration through his research and collaborations.

  7. Manufacturing Innovation Multi-Topic Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation Multi-Topic Workshop Manufacturing Innovation Multi-Topic Workshop DOE's Advanced Manufacturing Office (AMO) and the Office of Secretary of Defense Manufacturing Technology Program (OSD ManTech) held a joint workshop October 8 and 9, 2014 in Fort Worth, TX. This workshop identified mid-Technology Readiness Level (TRL) research and development (R&D) needs, market and supply chain challenges, and shared facility needs for advanced manufacturing. The workshop complemented a recently

  8. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    Among States in the Eastern Interconnection on Electric Resource Planning and Priorities | Department of Energy Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of

  9. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    Among States in the Western Interconnection on Electric Resource Planning and Priorities | Department of Energy Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of

  10. Interconnection-Wide Transmission Planning Initiative: Topic B, State

    Energy Savers [EERE]

    Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection | Department of Energy State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide

  11. Topic B Awardee: Western Governors' Association | Department of Energy

    Energy Savers [EERE]

    Western Governors' Association Topic B Awardee: Western Governors' Association For the Topic A input requirements of the award, the states and provinces in the Western Interconnection have formed a new committee -- the State and Provincial Steering Committee -- to provide input in regional transmission planning and analysis in the interconnection. The Committee will consist of representatives from each state and province in the Western Interconnection. Pending formal announcement, the Committee

  12. Events & Topics In Bioenergy | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events & Topics In Bioenergy Events & Topics In Bioenergy Dr. Chenyang Lu Smart Building with Wireless Sensor Networks Dr. Joseph Cullen "Measuring the Environmental Benefits of Wind Power" Dr. Pratim Biswas "Aerosol nanoparticle technology enabling solar energy applications: Biohybrid and biomimetic solar devices" Dr. Dewey Holten "Bioinspired and Biohybrid photosynthetic antenna systems for energy applications" Mark Henson "Modeling the Production of

  13. Funding Topics for Small Business Innovation Research and Small Business

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Transfer Programs | Department of Energy Topics for Small Business Innovation Research and Small Business Technology Transfer Programs Funding Topics for Small Business Innovation Research and Small Business Technology Transfer Programs Each year, the Office of Energy Efficiency and Renewable Energy's (EERE's) Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs issue Funding Opportunity Announcements (FOAs), which invite established or

  14. Request for Information (RFI): Clean Energy Manufacturing Topics Suitable

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for a Manufacturing Innovation Institute | Department of Energy Clean Energy Manufacturing Topics Suitable for a Manufacturing Innovation Institute Request for Information (RFI): Clean Energy Manufacturing Topics Suitable for a Manufacturing Innovation Institute April 17, 2014 - 11:04am Addthis Funding: This RFI is not a Funding Opportunity Announcement (FOA); therefore, EERE is not accepting applications at this time. Open Date: 04/17/2014 Close Date: 05/20/2014 Funding Organization: The

  15. 18th Topical Conference High-Temperature Plasma Diagnostics (HTPD) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton Plasma Physics Lab May 16, 2010, 9:00am to May 20, 2010, 5:00pm Conference Wildwood, New Jersey 18th Topical Conference High-Temperature Plasma Diagnostics (HTPD) The 18th Topical Conference on High-Temperature Plasma Diagnostics will be held May 16-20, 2010 in Wildwood, New Jersey. This biennial conference brings together plasma physicists from a variety of fields including magnetic confinement fusion, inertial confinement fusion, space plasmas, astrophysics, and industrial

  16. SBIR/STTR Phase I Release 2 Technical Topics Announced for FY14 Fuel Cell Topics Included

    Broader source: Energy.gov [DOE]

    Phase I Release 2 technical topics include prototype fuel cell-battery electric hybrid trucks for waste transportation and novel membranes and non-platinum group metal catalysts for direct methanol as well as hydrogen fuel cells.

  17. Unveiling the Implementation Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory www.ornl.gov Unveiling the Implementation Guide October 11, 2011 Michaela Martin Program Manager Residential, Commercial, and Industrial Energy ...

  18. The Human Genome Diversity Project

    SciTech Connect (OSTI)

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  19. MHK Projects/Wave Energy AS Project 1 | Open Energy Information

    Open Energy Info (EERE)

    Project Installed Capacity (MW) 0 Device Nameplate Capacity (MW) Concept implemented in breakwater structures capacity will depend on local wave energy and length of breakwater...

  20. Project Reports for Washoe Tribe of Nevada and California- 2011 Project

    Broader source: Energy.gov [DOE]

    The main purpose of the proposed project will further the achievement and implementation of common goals and strategic energy plans of Nevada member tribes.

  1. Manhattan Project: How to Navigate this Site

    Office of Scientific and Technical Information (OSTI)

    HOW TO NAVIGATE THIS SITE Resources > Navigation There are five main topical areas on this web site: Events, People, Places, Processes, and Science. These are further divided into sub-sections, each with its own introduction. The main topical areas can be accessed by clicking on a button on the horizontal bar above. Sub-sections can be accessed by clicking on a topic in the vertical column to your left. If you would like to begin with a quick survey of the Manhattan Project, try reading, in

  2. Property:Geothermal/ProjectTypeTopic2Count | Open Energy Information

    Open Energy Info (EERE)

    + 0 + Geothermal Data Development, Collection, and Maintenance + 0 + Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and...

  3. Property:Geothermal/NumberOfArraProjectTypeTopic2 | Open Energy...

    Open Energy Info (EERE)

    + 7 + Geothermal Data Development, Collection, and Maintenance + 3 + Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and...

  4. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  5. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect (OSTI)

    Olson, Jason; Andersen, Todd

    2004-04-01

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  6. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect (OSTI)

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  7. Indian River Hydroelectric Project Grant

    SciTech Connect (OSTI)

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  8. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This guide is a tool for Federal Project Directors (FPD) and Federal Program Managers in planning and preparing for appropriate reviews as an integral part of the project planning and implementation cycle.

  9. Idaho National Laboratory (INL) Seismic Risk Assessment Project:

    Office of Environmental Management (EM)

    Implementation of Proposed Methodology at INL and Associated Risk Studies | Department of Energy Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Idaho National Laboratory (INL) Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. PDF icon INL Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL

  10. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  11. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961...

  12. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It ...

  13. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  14. Events & Topics in Renewable Energy & the Environment | Photosynthetic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Antenna Research Center Events & Topics in Renewable Energy & the Environment Events & Topics in Renewable Energy & the Environment Missouri MetroLink Facility April 12, 2016 - 4:00pm 700 S. Ewing, St. Louis, MO 63103 Event flyer RSVP here Free bus will depart from the front of Brookings Hall at 3:30 pm sharp and will return to the same location following the tour. If you plan to drive yourself, please contact Erin Plut (eplut@wustl.edu) for parking information and meet up

  15. Topic Index to the DOE Administrative Records Disposition Schedules

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5/21/07 TOPICINDEXTODOEADMINSCHEDULES Topic Index to the DOE Administrative Records Disposition Schedules (excluding the GRS Schedules) Topic Schedule Item [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [X] [Y] [Z] A Academic/Outreach Program 1 44 Access Request Files 18 6 Accountable Officers' Files 6 1 Accounting Administrative Files 6 5 Administrative Claims Files 6 10 Administrative Training Records 1 29.2 Administrative Issuances 16 1

  16. Acoustics topic of upcoming Frontiers in Science series

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acoustics topic of upcoming Frontiers in Science Acoustics topic of upcoming Frontiers in Science series Dipen Sinha will discuss acoustics and its applications, including how it is possible to use sound to solve problems in health, national security and for industry. July 24, 2014 Whenever an object vibrates, it creates sound, vibrations can 0:19 be detected. Besides just listening to it, we can detect it with various sensors. We 0:25 can tell what's inside a single container from the sound or

  17. WINDExchange: Funding School Wind Projects

    Wind Powering America (EERE)

    Funding School Wind Projects Funding school wind installations can be challenging, but many schools have successfully secured funding to install turbines and implement curricula. The following examples of methods used to fund Wind for Schools projects may be useful for anyone researching funding wind turbine installations at schools; also see the Wind for Schools Funding Spreadsheet for more examples of school turbine costs and mechanisms utilized to fund the projects. Photo of children in front

  18. ARM - LASSO Pilot Project Timeline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pilot Project Timeline LASSO Information LASSO Home LASSO Backgrounder Pilot Phase Begins for Routine Large-Eddy Simulations Pilot Project Timeline Presentations Science LASSO Implementation Strategy Related Information ARM Decadal Vision Archive of LASSO Information e-mail list LASSO Collaboration Letter Contacts William Gustafson, Lead Principal Investigator Andrew Vogelmann, Co-Principal Investigator Hanna Goss, Media Contact LASSO Pilot Project Timeline As the pilot phase progresses toward

  19. Energy Savings Performance Contract ENABLE Project Assistance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Project Assistance Energy Savings Performance Contract ENABLE Project Assistance FEMP works closely with agencies to ensure successful ESPC ENABLE projects. FEMP works closely with agencies to ensure successful ESPC ENABLE projects. The Federal Energy Management Program (FEMP) offers project assistance to help federal agencies implement Energy Savings Performance Contract (ESPC) ENABLE projects. FEMP project assistance includes help from federal project executives to identify and

  20. PICs Implementation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and

  1. Permanent Markers Implementation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815

  2. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program directed at ensuring compliance with federal and DOE regulations pertaining to the protection of human subjects participating in research. The Federal Policy for the Protection of Human Subjects was adopted by DOE on June 18, 1991, as Title 10 Code of Federal Regulations 745, Protection of Human Subjects, and expressed

  3. Blackout Final Implementation Report

    Energy Savers [EERE]

    Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors

  4. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  5. Security Improvements Project Completed Ahead of Schedule, $20...

    National Nuclear Security Administration (NNSA)

    2010 (1) July 2010 (1) June 2010 (5) April 2010 (2) January 2010 (1) December 2009 (1) 1 of 3 Related Topics apm project management llnl defense nuclear security Y-12 npo...

  6. Preface: Special Topic on Interfacial and Confined Water

    SciTech Connect (OSTI)

    Molinero, Valeria; Kay, Bruce D.

    2014-11-14

    This Special Topic on the Chemical Physics of Interfacial and Confined Water contains a collection of original research papers that showcase recent theoretical and experimental advances in the field. These papers provide a timely discussion of fundamental aspects of interfacial and confined water that are important in both natural environments and engineered applications.

  7. Accelerators, Beams And Physical Review Special Topics - Accelerators And Beams

    SciTech Connect (OSTI)

    Siemann, R.H.; /SLAC

    2011-10-24

    Accelerator science and technology have evolved as accelerators became larger and important to a broad range of science. Physical Review Special Topics - Accelerators and Beams was established to serve the accelerator community as a timely, widely circulated, international journal covering the full breadth of accelerators and beams. The history of the journal and the innovations associated with it are reviewed.

  8. TEC Working Group Topic Groups Archives Route Identification Process |

    Office of Environmental Management (EM)

    Department of Energy Route Identification Process TEC Working Group Topic Groups Archives Route Identification Process Route Identification Process Items Available for Download PDF icon Routing Discussion Paper (April 1998) More Documents & Publications TEC Meeting Summaries - January 1997 TEC Meeting Summaries - July 1997 TEC Meeting Summaries - January 1998

  9. Tritium R&D at AECL Selected Topics

    Office of Environmental Management (EM)

    Tritium R&D at AECL Selected Topics Tritium Focus Group Meeting, Savannah River Site 2014 April 22-24 Hugh Boniface Chalk River Laboratories, Ontario, CANADA Outline of Presentation * Introduction & Background * Tritium Facilities: Laboratories, old and new * Tritium Separations: CECE process * Tritium Properties: Materials * Tritium Exploitation: Batteries, Helium-3 * Other work: Education, environment, biology, fusion, hydrogen UNRESTRICTED / ILLIMITÉ 2 Background UNRESTRICTED /

  10. WINDExchange: Wind for Schools Affiliate Projects

    Wind Powering America (EERE)

    Wind for Schools Affiliate Projects Although the Wind for Schools project is supported in a limited number of states, Wind for Schools affiliate projects allow K-12 schools or state-based programs to leverage existing materials to implement activities in their areas. On this page, you will find information about affiliate projects for individual K-12 schools and for states. Affiliate projects do not receive financial support from the U.S. Department of Energy and the National Renewable Energy

  11. AIMFAST: Alignment Implementation for Manufacturing

    Energy Science and Technology Software Center (OSTI)

    2012-09-13

    AIMFAST is a software code used to align facets on a dish concentrator to a specific aimpoint strategy to minimize peak fluxes and maximize system optical performance. AIMFAST uses a large monitor or projections screen to display fringe patterns, and a machine vision camera to image the reflection of these patterns in the subject dish mirrors. From these images, a detailed map of surface normals can be generated and compared to design or fitted mirrormore » shapes. This fitted comparison is then used to develop a single vector representing the orientation of the facets relative to the design orientation, and provide near-real-time adjustment information to a communicating computer. The communicating computer can display adjustments or directly interface with adjustment tools. The software for the communicating computer is specific to the implementation and is not a part of AIMFAST.« less

  12. Developing Government Renewable Energy Projects

    SciTech Connect (OSTI)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  13. Chemistry {ampersand} Materials Science progress report summary of selected research and development topics, FY97

    SciTech Connect (OSTI)

    Newkirk, L.

    1997-12-01

    This report contains summaries of research performed in the Chemistry and Materials Science division. Topics include Metals and Ceramics, High Explosives, Organic Synthesis, Instrument Development, and other topics.

  14. SBIR and STTR: Topics, FY 2015 Phase I Release 2 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SBIR and STTR: Topics, FY 2015 Phase I Release 2 Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Programs: Topics, FY 2015, Phase I, Release ...

  15. 2015 DOE SSL R&D Workshop LED Topic Table Questions to Consider

    Broader source: Energy.gov [DOE]

    This document was distributed during the LED Topic Table portion of the DOE SSL R&D Workshop and aimed to prompt discussion on the following topics:

  16. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  17. Project Safety Oversight Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety, Codes & Standards » DOE Activities » Project Safety Oversight Activities Project Safety Oversight Activities For all DOE-funded projects, the Fuel Cell Technologies Office implements procedures and practices to ensure safety in the operation, handling, and use of hydrogen systems. This is accomplished through a peer review process that requires participants to complete a detailed safety evaluation, implement safety procedures, and develop a communication plan. Safety aspects of

  18. State and Local Code Implementation: Southwest Region - 2014 BTO Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Southwest Region - 2014 BTO Peer Review State and Local Code Implementation: Southwest Region - 2014 BTO Peer Review Presenter: Jim Meyers, Southwest Energy Efficiency Project View the Presentation PDF icon State and Local Code Implementation: Southwest Region - 2014 BTO Peer Review More Documents & Publications State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review DOE Codes Program Overview - 2015 Peer Review Energy Code Compliance

  19. Microsoft PowerPoint - TranspTopics_Sullivan

    Office of Environmental Management (EM)

    West Valley Demonstration Project Low-Level Waste Shipment Daniel Sullivan Federal Project Director Department of Energy/West Valley Demonstration Project May, 2014 www.energy.gov/EM 2 * U.S. Department of Energy Project * ~35 miles south of Buffalo, New York * New York State Energy Research and Development Authority (NYSERDA) holds title to the 3,345 acre site West Valley Demonstration Project (WVDP) Location of the West Valley Site United States 5/16/2014 2 www.energy.gov/EM 3 History 1962

  20. SBIR/STTR FY16 Phase 1 Release 1 Topics Announced—Includes Hydrogen Production and Fuel Cell Membrane Topics

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has announced the 2016 Small Business Innovation Research and Small Business Technology Transfer (SBIR/STTR) Phase I Release 1 Topics, including hydrogen production from organic waste streams and fuel cell membranes, through the Office of Basic Energy Sciences.

  1. Tank waste remediation system characterization project quality policies. Revision 1

    SciTech Connect (OSTI)

    Trimble, D.J.

    1995-10-02

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System.

  2. IPv6 Implementation Checklist

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IPv6 Implementation Checklist Engineering Services The Network OSCARS Fasterdata IPv6 Network IPv6 Implementation Checklist ESnet IPv6 Mirror Servers ESnet IPv6 History ESnet supports Sandia and APNIC IPv6 Background Radiation research Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback:

  3. Framework for Implementing DOE Order 144.1

    Office of Environmental Management (EM)

    Medical Screening Program Brochure Former Worker Medical Screening Program Brochure December 2014 The FWP brochure provides important information to inform former and current DOE Federal, contractor, and subcontractor employees about the benefits and services offered under the DOE Former Worker Medical Screening Program. Some of the topics described in the brochure include: a description of the program, how it is implemented, who is eligible to participate, what tests are offered, where exams

  4. Preface: Special Topic on Advances in Density Functional Theory

    SciTech Connect (OSTI)

    Yang, Weitao

    2014-05-14

    This Special Topic Issue on the Advances in Density Functional Theory, published as a celebration of the fifty years of density functional theory, contains a retrospective article, a perspective article, and a collection of original research articles that showcase recent theoretical advances in the field. It provides a timely discussion reflecting a cross section of our understanding, and the theoretical and computational developments, which have significant implications in broad areas of sciences and engineering.

  5. Topic A Awardee: Western Electricity Coordinating Council | Department of

    Energy Savers [EERE]

    Energy Western Electricity Coordinating Council Topic A Awardee: Western Electricity Coordinating Council Regional Transmission Expansion Planning (RTEP) The America Recovery and Reinvestment Act (ARRA) directs the Department of Energy (DOE) to provide assistance for the development of interconnection-based transmission plans for the Eastern and Western Interconnections, and for ERCOT. WECC received notification from the U.S. Department of Energy (DOE) on December 18, 2009 that it has been

  6. Topic B Awardee: Eastern Interconnection States' Planning Council |

    Energy Savers [EERE]

    Department of Energy Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of

  7. Focus Group Meeting (Topical Meeting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Meeting Date: April 30, 2008 Documents Available for Download PDF icon Meeting Agenda PDF icon Meeting Summary PDF icon Meeting Participants PDF icon Executive Summary/Actions PDF icon Information Package - Part I PDF icon Information Package - Part II More Documents & Publications Focus Group Meeting (Topical Wrap-Up) Training Work Group Charter 2012 National Trainers' Exchange for Department of Energy Safety and Health Trainers

  8. Mat. Sci. Training More Advanced Topics Jack Deslippe

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mat. Sci. Training More Advanced Topics Jack Deslippe Part 1: Building Applications at NERSC Jack Deslippe Applications Already Available Did you know that NERSC offers precompiled executables for more than 100 applications? Applications Already Available Did you know that NERSC offers precompiled executables for more than 100 applications? Example, Materials Science: VASP, NAMD, LAMMPS, NWCHEM, Quantum ESPRESSO, BerkeleyGW, SIESTA, Abinit, Gamess, GROMACS, GPAW MEEP, cpmd, libxc, etsf_io,

  9. Topic Group Reports  DOE Program Summaries

    Broader source: Energy.gov (indexed) [DOE]

    Philadelphia 1999 Meeting  Topic Group Reports  DOE Program Summaries  Discussion of SNF Storage Initiatives & Transportations Issues  Discussion of WIPP Opening  Summary of Breakout Sessions The Transportation External Coordination (TEC) Working Group held its 15th semi-annual meeting July 14-15, 1999 in Philadelphia, Pennsylvania. Over 150 members, participants, and observers representing state, tribal, and local governments, regional groups, industry and professional

  10. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  11. Regulatory cross-cutting topics for fuel cycle facilities.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

    2013-10-01

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research&Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas:Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities)Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed:Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

  12. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  13. Project Benefits

    Broader source: Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  14. Hydropower Projects

    Broader source: Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  15. Transition Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-24

    This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

  16. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  17. 11th Topical conference high-temperature plasma diagnostics. Book of abstracts

    SciTech Connect (OSTI)

    1996-06-01

    This report contains abstracts from the 11th topical conference on high-temperature plasma diagnostics.

  18. Topic: Cesium Management and Disposition Alternatives for the Low Activity Waste Pre-Treatment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules PDF icon Topic Index to the DOE Administrative Records Disposition Schedules More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS

  19. DOE-TSPP-11, Technical Standards Program Topical Committees- July 1, 2009

    Broader source: Energy.gov [DOE]

    This procedure describes how topical committees are organized and recognized under the Technical Standards Program.

  20. DOE-TSPP-9-2013, DOE Technical Standards Program Topical Committees

    Broader source: Energy.gov [DOE]

    This procedure describes how topical committees are organized and recognized under the Technical Standards Program (TSP).

  1. DOE-TSPP-11, Technical Standards Program Topical Committees- August 1, 2000

    Broader source: Energy.gov [DOE]

    This procedure describes how topical committees are organized and recognized under the Technical Standards Program.

  2. Foreign Obligations Implementation Status Presentation

    National Nuclear Security Administration (NNSA)

    January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 ...

  3. Implementing Equipment Based Obligations Presentation

    National Nuclear Security Administration (NNSA)

    Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 004 Crowne Crowne Plaza Plaza Ravinia Ravinia Atlanta, GA Atlanta, GA page ...

  4. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    system and smart gird implementation by curriculum update; * Attract and invite experts in ... Curriculum Development: We plan to 1) build phasor measurement unit (PMU) testing system ...

  5. TEC Working Group Topic Groups Rail Key Documents Planning Subgroup...

    Office of Environmental Management (EM)

    Planning Subgroup Planning Subgroup PDF icon Rail Planning Timeline PDF icon Benchmarking Project: AREVA Trip Report More Documents & Publications TEC Meeting Summaries -...

  6. Topic A Awardee: Western Electricity Coordinating Council | Department...

    Office of Environmental Management (EM)

    energy developers, and consumer advocates and expects to begin the project in the first quarter of 2010 with the formation of a multi-stakeholder Scenario Planning ...

  7. Topic Area 2: Data Gathering and Analysis | Open Energy Information

    Open Energy Info (EERE)

    es":,"rectangles":,"locations":"text":"Project" title"Finite...

  8. Property:DIA/Topic/Economic | Open Energy Information

    Open Energy Info (EERE)

    +, All +, Energy Security +, ... Evaluating the Impact of Development Projects on Poverty: A Handbook for Practitioners + Employment +, All +, General + Ex Ante Appraisal...

  9. Federal Energy and Water Efficiency Project Financing | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy and Water Efficiency Project Financing Federal Energy and Water Efficiency Project Financing The Federal Energy Management Program (FEMP) offers financing options for agencies that are ready to implement energy and water efficiency projects. Carefully matching available project financing options with specific situations can make the difference between a stalled, unfunded project and a successful project that generates energy and cost savings. To find the right project financing option

  10. Project Reports for Yurok Tribe- 2005 Project

    Broader source: Energy.gov [DOE]

    The Yurok Tribe has a great need for improved energy services on the reservation. The members pay $328 per month per household on average for energy, with just a $9,000 median household income. The project will assess the need for energy efficiency services on the reservation, identify available resources, and develop an implementation plan for meeting these needs. With an unemployment rate of 42%, the job training component of this program will benefit the tribe. Past attempts have been made to provide energy efficiency and renewable energy maintenance services on the reservation, but many of these services have not endured because they were not tribe-driven. This project will build tribal expertise, increase awareness, and form collaborative relationships with local energy services.

  11. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect (OSTI)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  12. Tribal Renewable Energy Advanced Course: Project Development Concepts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Concepts Tribal Renewable Energy Advanced Course: Project Development Concepts Watch the DOE Office of Indian Energy renewable energy course entitled "Tribal Renewable Energy Project Development: Advanced Concept Topics" by clicking on the .swf file below. You can also download a PDF of the PowerPoint slides. This course provides in-depth information on project development concepts for renewable energy projects on tribal lands, including: Risk and uncertainty

  13. Tribal Renewable Energy Advanced Course: Project Development Process |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Process Tribal Renewable Energy Advanced Course: Project Development Process Watch the DOE Office of Indian Energy renewable energy course entitled "Tribal Renewable Energy Project Development: Advanced Process Topics" by clicking on the .swf file below. You can also download a PDF of the PowerPoint slides. This course provides in-depth information on project development processes for renewable energy projects on tribal lands, including: Understanding the

  14. New Fuel Cell Projects Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Fuel Cell Projects Meeting New Fuel Cell Projects Meeting On February 13-14, 2007, the U.S. Department of Energy (DOE) held a kick-off meeting for fuel cell projects awarded under a hydrogen R&D solicitation. Principal investigators presented project overviews, which are provided below. Topics include: Membranes Water transport studies Catalyst development Innovative fuel cell concepts Cell hardware Reporting requirements Impurity studies Demonstrations The following documents are

  15. 2009 New Fuel Cell Projects Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 New Fuel Cell Projects Meeting 2009 New Fuel Cell Projects Meeting On September 30-October 1, 2009, the U.S. Department of Energy (DOE) held a kick-off meeting for new projects awarded under a fuel cell solicitation. Principal investigators presented project overviews, which are provided below. Topics include: Catalysts Transport Durability Innovative Concepts Portable Power. Meeting Agenda and Overviews Meeting Agenda Program Overview, Sunita Satyapal and Dimitrios Papageorgopoulos Reporting

  16. Project Manager Ned Sauthoff Talks About US ITER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy & Guidance Documents Project Management Policy & Guidance Documents << Return to Directives & Documents | Proceed to Publications & Documents >> Document Type Function

    Publications & Documents Project Management Publications & Documents << Return to Directives & Documents | Proceed to Policy & Guidance >> Filter by Source Filter by Topic

    Project Management Project Management Workers safely demolished a 175-foot-high exhaust

  17. Selected topics in particle accelerators: Proceedings of the CAP meetings. Volume 4

    SciTech Connect (OSTI)

    Parsa, Z.

    1995-10-01

    This Report includes copies of transparencies and notes from the presentations made at the Center for Accelerator Physics at Brookhaven National Laboratory. Editing and changes to the authors` contributions in this Report were made only to fulfill the publication requirements. This volume includes notes and transparencies on eight presentations: ``Application of Accelerator-Driven Spallation Targets - Including Tritium Production and Nuclear Waste Transmutation``, ``BNL 5 MW Pulsed Spallation Neutron Source Study``, ``Designing and Understanding of Magnets with the Help of Conformal Mapping``, ``Laser - Electron Beam Scattering Coherent Compton X-Ray Sources``, ``The LHC Project``, ``Optimization of the Photocathode-Linac Separation for the ATF [Accelerator Test Facility] Injection System``, ``On CEBAF Commissioning: First Results``, and ``The Proposed Booster Application Facility at BNL``. An Appendix lists dates, topics, and speakers from October 1989 to December 1994.

  18. Energy Efficiency Project Development

    SciTech Connect (OSTI)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

  19. Breakout Items Action Items Fixed Price Contracting Topic Group...

    Office of Environmental Management (EM)

    would continue to be paid if they had to divert shipments to alternate routes. Mr. English responded that if DOE implemented such a cost mechanism, the instrument would no...

  20. TEC Working Group Topic Groups Section 180(c)

    Broader source: Energy.gov [DOE]

    Section 180(c) is a provision in the Nuclear Waste Policy Act that requires DOE to implement a program of technical and financial assistance to states for training public safety officials of...

  1. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  2. Looking for project-based learning activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Looking for project-based learning activities to incorporate energy into your classroom or program? Explore these K-12 resources to get started today. The Office of Energy Efficiency and Renewable Energy (EERE) has the following featured lesson plans, labs, projects, videos and other activities for grades K-12 on energy-related topics. Download or order resources today. For a complete listing, visit energy.gov/eere/education/teach-and-learn Activity and Coloring Books The Get Current Coloring

  3. Preparing for Project Implementation before an Energy Assessment

    Broader source: Energy.gov [DOE]

    This presentation covers the essential steps to help an organization prepare for an energy assessment.

  4. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    West Virginia Natural Gas Gross Withdrawals (Million Cubic Feet) West Virginia Natural Gas Gross Withdrawals (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 17,794 15,880 17,289 16,401 16,256 15,660 15,973 15,968 15,638 17,037 16,994 17,715 1992 16,181 14,439 15,437 14,931 15,051 14,580 14,882 14,715 14,553 15,620 15,473 16,137 1993 15,164 14,540 14,678 13,676 13,828 13,984 13,701 14,144 14,031 14,506 13,568 15,205 1994 16,294 15,623 15,772 14,695 14,859 15,027

  5. Implementing a Zero Energy Ready Home Multifamily Project (Technical...

    Office of Scientific and Technical Information (OSTI)

    country have addressed many of the technical challenges of building to the ZERH standard. ... National Renewable Energy Laboratory (NREL), Golden, CO (United States) Publication Date: ...

  6. Procuring and Implementing Solar Projects on Public Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... And this is a 100-page guide that's really soup to nuts, ... in the Room", starts the discussion, and the last chapter is ... should also be able to teach a hands-on installation class. ...

  7. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 9 PC4 Provides PQ for 21st century needs 1. *Reactive response to customer PQ (Power Quality) complaints, adversarial discussions over who is responsible for fix. 2. *PQ ...

  8. Implementing a Zero Energy Ready Home Multifamily Project (Technical...

    Office of Scientific and Technical Information (OSTI)

    This report discusses challenges encountered, lessons learned, and how obstacles were overcome. Authors: Springer, David 1 ; German, Alea 1 + Show Author Affiliations Alliance ...

  9. Federal Sector Renewable Energy Project Implementation: ""What's Working and Why

    Broader source: Energy.gov [DOE]

    Presentation by Robert Westby, National Renewable Energy Laboratory, at the Waste-to-Energy Using Fuel Cells Workshop held Jan. 13, 2011.

  10. Project Notebook - Makah Indian Nation "Next Steps to Implement...

    Office of Environmental Management (EM)

    Potential sources of self-generation Wave energy Bio-gasification Small wind energy ... Execute on minimal necessity Load Summary Meters % of Total Annual usage kWh Res 1 phase ...

  11. Implementing Bayesian Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Implementing Bayesian Statistics and a Full Systematic Uncertainty Propagation with the Soft X-Ray Tomography Diagnostic on the Madison Symmetric Torus by Jay Johnson A thesis submitted in partial fulfillment of the requirements for the degree of Bachelors of Science (Physics) at the University of Wisconsin - Madison 2013 i Abstract The Madison Symmetric Torus uses multiple diagnostics to measure electron temper- ature (T e ). The soft x-ray (SXR) diagnostic measures T e from x-ray emission in

  12. TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JACKSONVILLE, FL

    Office of Environmental Management (EM)

    JACKSONVILLE, FL JANUARY 20, 1999 Mr. Kevin Blackwell (USDOT/FRA) updated the group on the status of the DOT response to DOE's inquiry about the tribal right to inspect rail shipments. The response was in the final stages of review in the General Counsel's office and is expected by July 1999. The Group has added a representative from the NRC General Counsel's office, as a topic group member, to help keep abreast of developments in the NRC's upcoming draft rulemaking regarding tribes and advanced

  13. TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JULY 13, 1999 Crowne

    Office of Environmental Management (EM)

    JULY 13, 1999 Crowne Plaza Center City Hotel, Philadelphia, PA Kevin Blackwell (U.S. Department of Transportation/Federal Rail Administration) (DOT/FRA) presented an overview of the topic group's discussion. The status of the DOT/FRA's response to DOE's inquiry about the tribal right to inspect rail shipments is still an open issue. At the time of the July meeting, the response was in the final stages of review in the Secretary of Transportation's Legal Division. The response will be forwarded

  14. Washoe Tribe of Nevada and California- 2011 Project

    Broader source: Energy.gov [DOE]

    The main purpose of the proposed project will further the achievement and implementation of common goals and strategic energy plans of Nevada member tribes.

  15. NSTAR Electric & Gas Corporation Smart Grid Demonstration Project...

    Open Energy Info (EERE)

    Project which is based in Westwood, Massachusetts. Overview Develop and implement a Smart Grid pilot program that will examine technologies to leverage existing automated...

  16. Save Energy Now LEADER Web Conference: Preparing for Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Accomplishments Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  17. Reviewing Measurement and Verification Plans for Federal ESPC Projects

    Broader source: Energy.gov [DOE]

    Document provides a framework for implementing uniform and consistent reviews of measurement and verification (M&V) plans for federal energy savings performance contract (ESPC) projects.

  18. Modernization project comes online at Savannah River | National...

    National Nuclear Security Administration (NNSA)

    Automated Reservoir Management System (ARMS) was based on hardware and software architecture that were approaching obsolescence, prompting a multi-year project to implement its...

  19. PROJECT PROFILE: California Center for Sustainable Energy (Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    As part of this process, CSE will implement a pilot project in Santa Monica, California, engaging both apartment buildings and condominiums in the multifamily sector in order to ...

  20. FAO Global Inventory of Agricultural Mitigation Projects in Developing...

    Open Energy Info (EERE)

    emissions can be reduced and sinks created in biomass and soils while increasing resilience and productivity. The project will contribute to ongoing research and implementation...

  1. Idaho National Laboratory (INL) Seismic Risk Assessment Project...

    Office of Environmental Management (EM)

    Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. ...

  2. The monitoring, evaluation, reporting, and verification of climate change mitigation projects: Discussion of issues and methodologies and review of existing protocols and guidelines

    SciTech Connect (OSTI)

    Vine, E.; Sathaye, J.

    1997-12-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations (i.e., joint implementation), climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG impacts (i.e., environmental, economic, and social impacts). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects in order to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues and methodologies involved in MERV activities. In addition, they review protocols and guidelines that have been developed for MERV of GHG emissions in the energy and non-energy sectors by governments, nongovernmental organizations, and international agencies. They comment on their relevance and completeness, and identify several topics that future protocols and guidelines need to address, such as (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other impacts; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  3. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  4. Discontinued Projects

    Broader source: Energy.gov [DOE]

    Discontinued projects received a loan or a loan guarantee from DOE, but that are considered discontinued by LPO for one of several reasons.

  5. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  6. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  7. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  8. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the...

  9. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  10. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  11. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment ... engineering programs and the pit manufacturing program. STUDENT RESOURCES Precollege ...

  12. Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-12-21

    The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives.

  13. Small Business Administration Recovery Act Implementation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation PDF icon Small ...

  14. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and "packed") for the 3D-FFT and compared them to the original IMPACT implementation ("serial"). The new "packed" algorithm is fastest in all cases (especially at high...

  15. Enterprise Assessments Review, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    review of activity-level implementation of the radiation protection program at the West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June...

  16. Alaska Native Tribal Health Consortium- 2011 Project

    Broader source: Energy.gov [DOE]

    The main objective of the proposed project is to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit.

  17. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    SciTech Connect (OSTI)

    J. T. Beck

    2007-04-26

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities.

  18. Project Reports for Sealaska Native Corporation- 2002 Project

    Broader source: Energy.gov [DOE]

    Sealaska Corporation is conducting a comprehensive feasibility study that demonstrates the potential sustainability of renewable energy development on Southeast Alaska native village lands. The feasibility study includes an assessment of wind and micro-hydroelectric power potential, and will conclude with a business plan to obtain financing for the implementation of a sustainable renewable energy project.

  19. Project Reports for Makah Indian Tribe- 2002 Project

    Broader source: Energy.gov [DOE]

    The Makah Indian Reservation is conducting a comprehensive feasibility study to demonstrate the potential sustainability of renewable energy development on tribal lands. The feasibility study will include an assessment of wind and micro-hydroelectric potential, and will conclude with a business plan to obtain financing for the implementation of a sustainable renewable energy project.

  20. Project Reports for San Carlos Apache Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The core purpose of this project is to provide for the analysis and implementation of a Tribal Energy Organization that can effectively provide for coordination, leadership, and energy expertise to the rest of the tribal government in understanding and pursuing energy programs and plans.

  1. Awarded projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  2. NREL Smart Grid Projects

    SciTech Connect (OSTI)

    Hambrick, J.

    2012-01-01

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  3. Waste Solidification Building Project Lessons Learned Report | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Waste Solidification Building Project Lessons Learned Report Waste Solidification Building Project Lessons Learned Report This report addresses lessons learned from the Waste Solidification Building project at the Savannah River Site relative to design, procurement, construction, startup, and commissioning. The objective is to identify successes, issues encountered, opportunities for improvement, and recommendations for implementation on future projects. (October 2015) PDF icon

  4. Idaho Completion Projects Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect (OSTI)

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  5. Sealaska Native Corporation- 2002 Project

    Broader source: Energy.gov [DOE]

    Sealaska Corporation is conducting a comprehensive feasibility study that demonstrates the potential sustainability of renewable energy development on Southeast Alaska native village lands. The feasibility study includes an assessment of wind and micro-hydroelectric power potential, and will conclude with a business plan to obtain financing for the implementation of a sustainable renewable energy project.

  6. Makah Indian Tribe- 2002 Project

    Broader source: Energy.gov [DOE]

    The Makah Indian Reservation is conducting a comprehensive feasibility study to demonstrate the potential sustainability of renewable energy development on tribal lands. The feasibility study will include an assessment of wind and micro-hydroelectric potential, and will conclude with a business plan to obtain financing for the implementation of a sustainable renewable energy project.

  7. Discussion series on PURPA related topics: information to customers

    SciTech Connect (OSTI)

    Sturgeon, J I

    1980-08-01

    This volume relates primarily to Time-of-Day rates standard, PURPA IB(d)3, and deals with the content and methods of providing rate and conservation information to customers when Time-of-Day rates are used. Information to customers in the Demonstration and Pilot Projects fell mainly into four categories: administrative communications; explanations of new rate structures; information and advice on load management; and facts, recommendations and encouragements about energy conservation and end-use improvement. Administrative communications were about such matters as the existence of Projects, their funding, their periods of performance, the selection of their test customers, conditions of participation, procedural changes during the tests, and the time and conditions of ending the tests. These communications were important to good customer cooperation. All Demonstration Projects devoted considerable effort to the crucial task of clearly explaining the rationale of Time-of-Use (TOU) pricing and the test rate structures. The Projects then presented the concept of TOU pricing as a means of (a) fairly charging customers the true cost of their electricity and (b) rewarding them for shifting consumption to times when costs are less. For the most part, Demonstration Projects gave specific information on the individual customer's own rate structure and none on any others that were under test. The information was presented in face-to-face interviews, group presentations, television, radio, and print media, and traveling exhibits. The results are evaluated. (LCL)

  8. Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

  9. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  10. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  11. State and Local Code Implementation: Southeast Region - 2014 BTO Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Southeast Region - 2014 BTO Peer Review State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review Presenter: Lauren Westmoreland, Southeast Energy Efficiency Alliance View the Presentation PDF icon State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review More Documents & Publications Southeast Energy Efficiency Alliance's Building Energy Codes Project EA-1872: Draft Environmental Assessment EA-1871: Final Environmental

  12. TEC Working Group Topic Groups Manual Review Key Documents | Department of

    Energy Savers [EERE]

    Energy Manual Review Key Documents TEC Working Group Topic Groups Manual Review Key Documents Key Documents PDF icon Transportation Practices Manual (DOE M 460) - March 8, 2006 More Documents & Publications DOE Shipment Activities: What We Accomplished and a Look Forward TEC Working Group Topic Groups Section 180(c) Key Documents TEC Working Group Topic Groups Rail Key Documents

  13. Savannah River Site Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  14. EGS Projects

    Broader source: Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  15. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  16. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The purpose of this project is to develop improved heat transfer fluids, thermal storage ... The majority of the current R&D effort is focused on parabolic trough facilities. Sandia ...

  17. Lake Charles CCS Project

    SciTech Connect (OSTI)

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO2 per year as an integral component of commercial operations.

  18. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    05 ERSD Annual Report Project #1027697 Long-term Stewardship of Mixed Wastes: Passive Reactive Barriers for Simultaneous In Situ Remediation of Chlorinated Solvent, Heavy Metal and Radioactive.... Principal Investigator: Gerlach, Robin Organization: Montana State University Results To Date 1. MOST RECENT RESULTS TO DATE This project report addresses one part of a 3-way collaboration between researchers (Drs. Robin Gerlach and Al Cunningham) at Montana State University's (MSU's) Center for

  19. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  20. Yurok Tribe- 2005 Project

    Broader source: Energy.gov [DOE]

    The Yurok Tribe has a great need for improved energy services on the reservation. The members pay $328 per month per household on average for energy, with just a $9,000 median household income. The project will assess the need for energy efficiency services on the reservation, identify available resources, and develop an implementation plan for meeting these needs. With an unemployment rate of 42%, the job training component of this program will benefit the tribe. Past attempts have been made to provide energy efficiency and renewable energy maintenance services on the reservation, but many of these services have not endured because they were not tribe-driven. This project will build tribal expertise, increase awareness, and form collaborative relationships with local energy services.

  1. Ensuring Project Success - The Fundamental Art of Managing the Interfaces |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Ensuring Project Success - The Fundamental Art of Managing the Interfaces Ensuring Project Success - The Fundamental Art of Managing the Interfaces August 2009 Presenter: Jeff Smith, Deputy for Operations, Oak Ridge National Laboratory Track 8-3 Topics Covered: Oak Ridge National Laboratory evolved from the Manhattan Project ORNL is DOE's largest science and energy laboratory Our scope of activities today has no precedent in ORNL's history Two DOE Energy Frontier

  2. South Dakota PrairieWinds Project Executive Summary Executive Summary

    Office of Environmental Management (EM)

    PrairieWinds Project Executive Summary Executive Summary This executive summary is included in the beginning of the Draft Environmental Impact Statement (DEIS) for the South Dakota PrairieWinds Project (Proposed Project) and is also intended to serve as a stand-alone document to provide a summary of the information contained within the full text version of the DEIS. For additional information on the topics contained within this summary please see the DEIS. S.1 INTRODUCTION Basin Electric Power

  3. Status of LLNL granite projects

    SciTech Connect (OSTI)

    Ramspott, L.D.

    1980-12-31

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site.

  4. Multinational Partnerships and Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multinational Partnerships and Projects Multinational Partnerships and Projects The Office of Energy Efficiency and Renewable Energy (EERE) plays a key role in a number of multinational energy relationships. Click on the links below to jump to the respective section. Clean Energy Ministerial International Partnership for Energy Efficiency Cooperation (IPEEC) International Renewable Energy Agency (IRENA) International Energy Agency (IEA) Working Groups and Implementing Agreements International

  5. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  6. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  7. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  8. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and The Over Target Schedule (OTS) Implementations

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers Over Target Baseline and Over Target Schedule implementations.

  9. Project Specific Quality Assurance Plan (QAPP)

    SciTech Connect (OSTI)

    Huston, J.J.

    1994-11-01

    The Project QAPP`s describe the program and the planned actions which WHC will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C. The Project involves retrieving the high-heat waste from Tank 241-C-106 to close the safety issue associate with the tank, demonstrate initial waste retrieval technology for a Single Shell Tank, and provide feed for the Hanford Waste Vitrification Plant.

  10. Clean coal reference plants: Atmospheric CFB. Topical report, Task 1

    SciTech Connect (OSTI)

    Rubow, L.N.; Harvey, L.E.; Buchanan, T.L.; Carpenter, R.G.; Hyre, M.R.; Zaharchuk, R.

    1992-06-01

    The Clean Coal Technology Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of full-scale facilities. The goal of the program is to provide the US energy marketplace with a number of advanced, more efficient and environmentally responsive coal-using technologies. The Morgantown Energy Technology Center (METC) has the responsibility for monitoring the CCT Projects within certain technology categories, which correspond to the center`s areas of technology development, including atmospheric fluidized bed combustion, pressurized fluidized bed combustion, integrated gasification combined cycle, mild gasification, and industrial applications. A measure of success in the CCT program will be the commercial acceptance of the new technologies being demonstrated. The dissemination of project information to potential users is being accomplished by producing a series of reference plant designs which will provide the users a basis for the selection of technologies applicable to their future energy requirements. As a part of DOE`s monitoring and evaluation of the CCT Projects, Gilbert/Commonwealth (G/C) has been contracted to assist in this effort by producing the design of a commercial size Reference Plant, utilizing technologies developed in the CCT Program. This report, the first in a series, describes the design of a 400 MW electric power plant, utilizing an atmospheric pressure, circulating fluidized bed combustor (ACFB) similar to the one which was demonstrated at Colorado-Ute`s Nucla station, funded in Round 1 of the CCT Program. The intent of the reference plant design effort was to portray a commercial power plant with attributes considered important to the utility industry. The logical choice for the ACFB combustor was Pyropower since they supplied the ACFB for the Nucla Project.

  11. Microsoft Word - List of topics_2016-05-16

    Office of Environmental Management (EM)

    Department of Energy Intellectual Property Provisions _NRD-1003_.doc Microsoft Word - Intellectual Property Provisions _NRD-1003_.doc PDF icon Microsoft Word - Intellectual Property Provisions _NRD-1003_.doc More Documents & Publications Intellectual Property Provisions (NRD-115) Nonresearch and Development Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - DRAFT CRB Interview Guidance.doc

    Project Management Career Development Program Certification and Equivalency Guidelines

  12. Hanford Advisory Board Draft Letter Topic: CRESP Comment letter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRESP Comment letter Authors: Harper, Engstrom & Vanni Originating Committee: River & Plateau Version #1 To: David S. Kosson, Principal Investigator with the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) and Mark Whitney, DOE-EM Acting Assistant Secretary Re: CRESP Methodology for the Hanford Site-wide Risk Review Project Dear Mssrs. Kosson and Whitney: The Hanford Advisory Board (Board) has been asked to provide comments on the Consortium for Risk Evaluation with

  13. Microsoft PowerPoint - TranspTopics_Shelton

    Office of Environmental Management (EM)

    ARPA-E Overview July 24, 2014 Peder Maarbjerg The ARPA-E Mission 1 Ensure America's * National Security * Economic Security * Energy Security * Technological Competiveness Catalyze and support the development of transformational, high-impact energy technologies Reduce Imports Reduce Emissions Improve Efficiency Creating New Learning Curves 2 Changing the Model Create Programs Manage Development Identify White Space Select Projects Advanced Technology Advanced Technology Markets and

  14. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #28, Spring 2011

    SciTech Connect (OSTI)

    Schell, D. J.

    2011-04-01

    Spring 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program sessions and special topic sessions; assessment of waste water treatment needs; and an update on new arabinose-to-ethanol fermenting Zymomonas mobilis strains.

  15. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    SciTech Connect (OSTI)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  16. Vitrification facility at the West Valley Demonstration Project

    SciTech Connect (OSTI)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

  17. Collaborative Research: Robust Climate Projections and Stochastic Stability of Dynamical Systems

    SciTech Connect (OSTI)

    Ghil, Michael; McWilliams, James; Neelin, J. David; Zaliapin, Ilya; Chekroun, Mickael; Kondrashov, Dmitri; Simonnet, Eric

    2011-10-13

    The project was completed along the lines of the original proposal, with additional elements arising as new results were obtained. The originally proposed three thrusts were expanded to include an additional, fourth one. (i) The e#11;ffects of stochastic perturbations on climate models have been examined at the fundamental level by using the theory of deterministic and random dynamical systems, in both #12;nite and in#12;nite dimensions. (ii) The theoretical results have been implemented #12;first on a delay-diff#11;erential equation (DDE) model of the El-Nino/Southern-Oscillation (ENSO) phenomenon. (iii) More detailed, physical aspects of model robustness have been considered, as proposed, within the stripped-down ICTP-AGCM (formerly SPEEDY) climate model. This aspect of the research has been complemented by both observational and intermediate-model aspects of mid-latitude and tropical climate. (iv) An additional thrust of the research relied on new and unexpected results of (i) and involved reduced-modeling strategies and associated prediction aspects have been tested within the team's empirical model reduction (EMR) framework. Finally, more detailed, physical aspects have been considered within the stripped-down SPEEDY climate model. The results of each of these four complementary e#11;fforts are presented in the next four sections, organized by topic and by the team members concentrating on the topic under discussion.

  18. Data base on dose reduction research projects for nuclear power plants. Volume 5

    SciTech Connect (OSTI)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  19. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  20. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  1. NEPA Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation NEPA Implementation Selected documents providing guidance on the implementation of NEPA. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution (CEQ, 2012) This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use

  2. HSE12 implementation in libxc

    Energy Science and Technology Software Center (OSTI)

    2013-05-13

    This piece of software is a new feature implemented inside an existing open-source library. Specifically, it is a new implementation of a density functional (HSE, short for Heyd-Scuseria-Ernzerhof) for a repository of density functionals, the libxc library. It fixes some numerical problems with existing implementations, as outlined in a scientific paper recently submitted for publication. Density functionals are components of electronic structure simulations, which model properties of electrons inside molecules and crystals.

  3. Implementation of ORR Groundwater Strategy

    Office of Environmental Management (EM)

    Manager Steve Haase, Ph.D., RSI Senior Geohydrologist June 10, 2015 www.energy.govEM 2 AGENDA: * Groundwater Strategy overview * Groundwater Strategy implementation status -...

  4. Launch implementation | Open Energy Information

    Open Energy Info (EERE)

    Launch implementation Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities DevelopBAU Stage 4:...

  5. Financing Program Implementation Process Flow

    Broader source: Energy.gov [DOE]

    The implementation process flow for financing with two models: a generic option for primary markets and a conceptual option for secondary markets.

  6. Implementation Standing Technical Committee Presentation

    Broader source: Energy.gov [DOE]

    This presentation outlines the goals of the Implementation Standing Technical Committee, as presented at the Building America Spring 2012 Stakeholder meeting on February 29, 2012, in Austin, Texas.

  7. CASL - Implementing Integrated Steam Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    implementation, and interpolation package codes have been approved for release as open source software. They will be made available in future for download at http:...

  8. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  9. National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #26, January - March 2010

    SciTech Connect (OSTI)

    Schell, D.

    2010-04-01

    January-March, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding and improving sugar measurements in biomass hydrolysates; expansion of the NREL/DOE Biochemical Pilot Plant.

  10. National Bioenergy Center--Biochemical Platform Integration Project: Quarterly Update, Fall 2010

    SciTech Connect (OSTI)

    Schell, D.

    2010-12-01

    Fall 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: rapid analysis models for compositional analysis of intermediate process streams; engineered arabinose-fermenting Zymomonas mobilis strain.

  11. About the Uniform Methods Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives & Projects » Uniform Methods Project » About the Uniform Methods Project About the Uniform Methods Project The Uniform Methods Project is developing measurement and verification protocols for determining energy savings for commonly implemented program measures. This work is being done through collaboration with energy efficiency program administrators, stakeholders, and EM&V consultants-including the firms that perform roughly 70% of the energy efficiency evaluations in

  12. Industrial Assistance and Projects Databases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Assistance and Projects Databases Industrial Assistance and Projects Databases AMO's databases provide information on energy assessments and recommendations, results and paybacks, and lessons learned by manufacturers who implement projects to save energy. Also review case studies from manufacturers. Combined Heat and Power (CHP) Project Profiles Database Arrow DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles. The documents

  13. Energy Savings Performance Contract ENABLE Awarded Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Awarded Projects Energy Savings Performance Contract ENABLE Awarded Projects This table summarizes energy savings performance contract (ESPC) ENABLE awarded projects. A list of U.S. Department of Energy indefinite-delivery, indefinite-quantity ESPC awarded projects is also available. Project Location Agency Award Date Energy Services Company Energy Conservation Measures Implementation Price* Guaranteed Annual Cost Savings Period of Performance Estimated Annual Energy Savings***

  14. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect (OSTI)

    Treis, Tania

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  15. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    SciTech Connect (OSTI)

    Griffiths, D.

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  16. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    SciTech Connect (OSTI)

    Griffiths, Dianne

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings (CARB) on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  17. Freescale Semiconductor Successfully Implements an Energy Management System

    Broader source: Energy.gov [DOE]

    This case study describes how Freescale Semiconductor implemented projects at its Oak Hill Fab plant in Austin, Texas, that reduced annual plant-wide energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year.

  18. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect (OSTI)

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  19. Proposed Work Scope for the Rail Topic Group

    Office of Environmental Management (EM)

    | Department of Energy Proposed EPA Rules Will Cut Carbon Pollution While Maintaining Reliability Proposed EPA Rules Will Cut Carbon Pollution While Maintaining Reliability June 3, 2014 - 4:20pm Addthis Photo via iStock by Getty Images. Photo via iStock by Getty Images. Melanie A. Kenderdine Melanie A. Kenderdine Director of the Office of Energy Policy and Systems Analysis Learn More Watch a video that explains how EPA's Clean Power Plan works. See the projected public health benefits of the

  20. Tank waste remediation system configuration management implementation plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  1. Multi Canister Overpack (MCO) Topical Report [SEC 1 THRU 3

    SciTech Connect (OSTI)

    LORENZ, B.D.

    2000-05-11

    In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ''Path Forward'' recommendation for resolution of the safety and environmental concerns associated with the deteriorating SNF stored in the Hanford Site's K Basins (Hansen 1995). The recommendation included an aggressive series of projects to design, construct, and operate systems and facilitates to permit the safe retrieval, packaging, transport, conditions, and interim storage of the K Basins' SNF. The facilities are the Cold VAcuum Drying Facility (CVDF) in the 100 K Area of the Hanford Site and the Canister Storage building (CSB) in the 200 East Area. The K Basins' SNF is to be cleaned, repackaged in multi-canister overpacks (MCOs), removed from the K Basins, and transported to the CVDF for initial drying. The MCOs would then be moved to the CSB and weld sealed (Loscoe 1996) for interim storage (about 40 years). One of the major tasks associated with the initial Path Forward activities is the development and maintenance of the safety documentation. In addition to meeting the construction needs for new structures, the safety documentation for each must be generated.

  2. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

  3. Vehicle Technologies Office Issues Notice of Intent for Multi-Topic Funding

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunity Announcement | Department of Energy Multi-Topic Funding Opportunity Announcement Vehicle Technologies Office Issues Notice of Intent for Multi-Topic Funding Opportunity Announcement April 26, 2016 - 10:16am Addthis The Vehicle Technologies Office has issued a Notice of Intent (No. DE-FOA-0001534) to make interested parties aware of its plan to issue a Funding Opportunity Announcement (FOA) entitled "FY 2016 Vehicle Technologies Multi-Topic Funding Opportunity

  4. Classification of Distributed Data Using Topic Modeling and Maximum Variation Sampling

    SciTech Connect (OSTI)

    Patton, Robert M; Beaver, Justin M; Potok, Thomas E

    2011-01-01

    From a management perspective, understanding the information that exists on a network and how it is distributed provides a critical advantage. This work explores the use of topic modeling as an approach to automatically determine the classes of information that exist on an organization's network, and then use the resultant topics as centroid vectors for the classification of individual documents in order to understand the distribution of information topics across the enterprise network. The approach is tested using the 20 Newsgroups dataset.

  5. Energy Department Announces Topics and New Approaches for Grants to Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Businesses in Clean Energy Technologies | Department of Energy Topics and New Approaches for Grants to Small Businesses in Clean Energy Technologies Energy Department Announces Topics and New Approaches for Grants to Small Businesses in Clean Energy Technologies October 31, 2013 - 1:10pm Addthis The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE) today announced new topics under its Small Business Innovation Research (SBIR) and Technology Transfer (STTR) program

  6. Hydropower Projects

    SciTech Connect (OSTI)

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  7. NESAP Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NESAP Projects NESAP Roles and Liaisons NERSC-8 Procurement Programming models File Storage and I/O Edison PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option

  8. Hallmark Project

    Energy Savers [EERE]

    Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity,

  9. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor

  10. Project Financing

    Office of Environmental Management (EM)

    Columbus HTS Power Cable Superconductivity Partnerships with Industry www.oe.energy.gov Phone: 202 \ 586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585 Plugging America Into the Future of Power This project involves field-testing of a long-length high-temperature superconducting (HTS) cable under real environmental stresses and real electrical loads. The cable system forms an important electrical

  11. Transportation Project Development and the National Environmental Policy Act

    SciTech Connect (OSTI)

    Lanthrum, J.G.

    2006-07-01

    This paper explores the nexus between project management and the National Environmental Policy Act (NEPA) activities for developing the Nevada Rail Line to Yucca Mountain. In many federal agencies, the responsibility for project management is completely separate from the responsibility for NEPA implementation; however, each Department of Energy (DOE) Departmental Element has a NEPA Compliance Officer. This ensures effective integration between NEPA and project management activities. As the project management and NEPA activities are implemented, it becomes clear that they are very complimentary processes. This paper will describe the integration of NEPA and project management activities for development of a rail line to the Yucca Mountain geologic repository in Nye County, Nevada. (authors)

  12. Audit Implementation Design Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit Implementation Design Plan Document Number: NA Effective Date: 08

  13. List of Topics for Interagency Performance & Risk Assessment Community of

    Energy Savers [EERE]

    Practice (P&RA CoP) Discussion | Department of Energy List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion PDF icon List of Topics - February 24, 2016 More Documents & Publications Status Updates on the

  14. NREL: Technology Deployment - Project Technical Assistance and Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Technical Assistance and Support NREL provides technical assistance and support for projects around the globe by assessing resources, analyzing designs, and guiding project implementation to help identify clean energy solutions. Learn more about NREL's work in the following areas: Federal Agencies Federal Agencies International International Islands Islands Research Campuses Research Campuses State and Local Governments State and Local Governments Tribes Tribes Utilities Utilities

  15. Regulatory Considerations for Developing Generation Projects on Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lands | Department of Energy Generation Projects on Federal Lands Regulatory Considerations for Developing Generation Projects on Federal Lands Presentation covers regulatory considerations for developing generation projects on federal lands. PDF icon regulatory_considerations_020613.pdf More Documents & Publications Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Comments Received on Proposed Rulemaking for regulation implementing section 216(h):

  16. Southeast Energy Efficiency Alliance's Building Energy Codes Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Southeast Energy Efficiency Alliance's Building Energy Codes Project Southeast Energy Efficiency Alliance's Building Energy Codes Project Building Codes Project for the 2013 Building Technologies Office's Program Peer Review PDF icon bldgcodes04_zweig_040213.pdf More Documents & Publications State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review Stretch/Reach Codes Energy Code Compliance and Enforcement

  17. Clean Coal Technology Programs: Completed Projects (Volume 2)

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  18. Guiding Principles for Successfully Implementing Industrial Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment ...

  19. Hazard Communication Training - Upcoming Implementation Date...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hazard Communication Training - Upcoming Implementation Date for New Hazard Communication Standard Hazard Communication Training - Upcoming Implementation Date for New Hazard ...

  20. Energy Sector Cybersecurity Framework Implementation Guidance

    Broader source: Energy.gov (indexed) [DOE]

    FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of Contents...