  1. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/EIS-0391 Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington Summary U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS)

  2. Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington

    Office of Environmental Management (EM)

    1996/01coversheet.htm[6/27/2011 11:34:32 AM] NEPA COVER SHEET TITLE: Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy (DOE), Richland Operations Office; Lead State Agency: Washington State Department of Ecology (Ecology). ABSTRACT: This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS)

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX B CONTRACTOR AND SUBCONTRACTOR NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENTS NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENT FOR PREPARATION OF THE TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON The Council of Environmental Quality regulations at Title 40 of the Code of Federal Regulatiolls (CFR), Section 1506.5(c), which have been adopted by the U.S. Department of Energy (10 CFR 1021), require contractors and

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX S WASTE INVENTORIES FOR CUMULATIVE IMPACT ANALYSES Integral to development of the inventory data set for the cumulative impact analyses presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington was identification of those waste sites potentially contributing to cumulative impacts on groundwater. Their identification involved two semi-independent, convergent processes: a Waste Information Data System screen and a

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX F DIRECT AND INDIRECT IMPACTS: ASSESSMENT METHODOLOGY This appendix briefly describes the methods used to assess the potential direct and indirect effects of the alternatives in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Included in this appendix are discussions of general impact assessment methodologies for land resources, infrastructure, noise and vibration, air quality, geology and soils, water resources,

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G-1 APPENDIX G AIR QUALITY ANALYSIS This appendix presents information on the nonradiological air quality impacts that could result from emissions associated with construction, operations, deactivation, and closure activities under the various alternatives described in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The impacts of criteria pollutants and toxic air pollutants were assessed by comparing estimated concentrations with

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R-1 APPENDIX R CUMULATIVE IMPACTS: ASSESSMENT METHODOLOGY This appendix describes the cumulative impacts methodology for the U.S. Department of Energy's Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The appendix is organized into sections on (1) regulations and guidance, (2) previous studies, (3) history of land use at the Hanford Site and in surrounding regions, (4) future land use at the Hanford Site, (5) future land use in

  8. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L-1 APPENDIX L GROUNDWATER FLOW FIELD DEVELOPMENT This appendix describes the development of the regional-scale groundwater flow field used for the groundwater modeling that supports assessment of the groundwater quality impacts discussed in the Draft and Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS), Chapters 5 and 6 and Appendices O and V. Included are an overview of groundwater flow at the site; the purpose

  9. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P-1 APPENDIX P ECOLOGICAL RESOURCES AND RISK ANALYSIS This appendix presents the ecological resources (see Section P.1) at the Hanford Site and lists the plants and animals evaluated in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Potential impacts of both airborne releases during operations and groundwater discharges under the various alternatives are evaluated in this appendix. The purpose of the risk analysis is to compare

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-1 APPENDIX E DESCRIPTIONS OF FACILITIES, OPERATIONS, AND TECHNOLOGIES Appendix E provides additional information about the technologies, processes, and facilities for the three key activities of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington: tank closure, Fast Flux Test Facility decommissioning, and waste management. Section E.1 includes this information for tank closure; Section E.2, for Fast Flux Test Facility

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-1 APPENDIX J ENVIRONMENTAL JUSTICE This appendix provides an assessment of the potential for disproportionately high and adverse human health or environmental effects on minority and low-income populations resulting from implementation of the alternatives described in Chapter 2 of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. J.1 INTRODUCTION Environmental justice is defined as "the fair treatment and meaningful

  12. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    X-1 APPENDIX X SUPPLEMENT ANALYSIS OF THE DRAFT TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON Consistent with U.S. Department of Energy (DOE) Regulations (10 CFR 1021.314(c)(3)), "DOE shall make the determination and the related Supplement Analysis available to the public for information. Copies of the determination and Supplement Analysis shall be provided upon written request. DOE shall make copies available for inspection in

  13. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 1 PROPOSED ACTIONS: BACKGROUND, PURPOSE AND NEED Chapter 1 describes the background, purpose and need for the agency action presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Section 1.1 provides summary information on the size and distribution of the waste inventory at the Hanford Site (Hanford), the specific objectives of this TC & WM EIS, and the regulatory basis for the proposed

  14. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume 3, Book 1 Section 1: Overview Section 2: Topics of Interest Section 3: Individual Commentors U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County,

  15. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reader's Guide U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County, Washington Contacts: For copies of this Final TC & WM EIS, call toll-free

  16. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County, Washington Contacts: For copies of this Final TC & WM EIS, call toll-free 1-888-829-6347, or contact Mary Beth Burandt at the address

  17. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 OVERVIEW OF THE PUBLIC COMMENT PROCESS 1-1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS This section of this Comment-Response Document (CRD) describes the public comment process for the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. Section 1.1 summarizes the organization of this CRD. Section 1.2 discusses the public comment process and the means

  18. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ▪ Public Comments and DOE Responses 3-1053 Campaign A March 16, 2010 As a resident of the Pacifc Northwest, I oppose the "preferred alternative" to ship nuclear waste from other Department of Energy sites to Hanford, as outlined in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (DOE/EIS--0391). I vehemently oppose the plan to add more radioactive waste to the Hanford site. Shipping this waste along Northwest

  19. Translation--Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington - FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Declaración de Impacto Ambiental Final para el Cierre de Tanques y la Administración de Desechos del Establecimiento de Hanford, Richland, Washington (DIAF CC & AD) (Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington) (DOE/EIS-0391) Preguntas Frecuentes ¿Cuáles son las acciones propuestas del Departamento de Energía de los Estados Unidos (DDE) (U.S. Department of Energy) presentadas en la DIAF CC & AD? La DIAF CC &

  20. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Hanford Site, Richland, Washington 5-394 5.2 FFTF DECOMMISSIONING ALTERNATIVES This section describes the potential long-term environmental and human health impacts associated with implementation of alternatives considered to decommission FFTF and auxiliary facilities at Hanford; to manage waste from the decommissioning process, including waste designated as remote-handled special components (RH-SCs); and to manage the disposition of the Hanford inventory of radioactively contaminated

  1. Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington--Frequent Asked Questions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Final TC & WM EIS) (DOE/EIS-0391) Frequently Asked Questions What are the U.S. Department of Energy (DOE) proposed actions in the Final TC & WM EIS? The Final TC & WM EIS (DOE/EIS-0391) evaluates three sets of proposed actions, as follows: Retrieve and treat the waste remaining in 177 underground storage tanks; store the high-level radioactive waste (HLW); dispose of

  2. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-1 CHAPTER 11 DISTRIBUTION LIST The U.S. Department of Energy (DOE) is committed to communicating with the public to ensure that potentially affected communities and other interested parties are given opportunities to receive information on the project and notice of public meetings and to comment. In 2003, the environmental impact statement database used existing site mailing information. Over time, the database has evolved through additions from scoping meetings held in 2003, 2004, and 2006

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-1 Dates for Alternatives The dates referenced in this environmental impact statement (EIS) for the alternatives were selected to support relationships between, and durations for, activities, thus allowing comparisons of the alternatives. They do not necessarily represent the current dates. For example, this EIS used a Waste Treatment Plant (WTP) startup date of 2018; the current WTP startup date is 2022. Note that the durations, rather than the startup dates, of the activities evaluated in

  4. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Hanford Site, Richland, Washington (Final TC & WM EIS) Washington State Department of Ecology (Ecology) Foreword Summary Ecology believes that the U.S. Department of Energy (DOE) and its contractor have prepared a Final TC & WM EIS that presents many important issues for discussion. Ecology's involvement in the production of this TC & WM EIS shows that this document has benefited from quality reviews and quality assurance procedures. In addition, this document benefited from

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site, Richland, Washington (Final TC & WM EIS) U.S. Environmental Protection Agency (EPA), Region 10 Foreword After receiving the EPA comments on the Draft TC & WM EIS, the U.S. Department of Energy (DOE) wrote to the EPA, inviting the EPA to be a cooperating agency in the development of this Final TC & WM EIS. The two agencies signed a memorandum of understanding (MOU) in April 2011 to formalize the EPA"s involvement as a cooperating agency and to define each

  7. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    SciTech Connect (OSTI)

    N /A

    2004-02-13

    This Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) ongoing and proposed waste management practices at the Hanford Site in Washington State. The HSW EIS updates some analyses of environmental consequences from previous documents and provides evaluations for activities that may be implemented consistent with the Waste Management Programmatic Environmental Impact Statement (WM PEIS; DOE 1997c) Records of Decision (RODs). The draft HSW EIS was initially issued in April 2002 for public comment (DOE 2002b). A revised draft HSW EIS was issued in March 2003 to address new waste management alternatives that had been proposed since the initial draft HSW EIS was prepared, and to address comments received during the public review period for the first draft (DOE 2003d). The revised draft HSW EIS also incorporated alternatives for disposal of immobilized low-activity waste (ILAW) from treatment of Hanford Site tank waste in the waste treatment plant (WTP) currently under construction, an activity that was not included in the first draft (68 FR 7110). This final HSW EIS describes the DOE preferred alternative, and in response to public comments received on the March 2003 revised draft, provides additional analyses for some environmental consequences associated with the preferred alternative, with other alternatives, and with cumulative impacts. Public comments on the revised draft HSW EIS are addressed in the comment response document (Volume III of this final EIS). This HSW EIS describes the environmental consequences of alternatives for constructing, modifying, and operating facilities to store, treat, and/or dispose of low-level (radioactive) waste (LLW), transuranic (TRU) waste, ILAW, and mixed low-level waste (MLLW) including WTP melters at Hanford. In addition, the potential long-term consequences of LLW, MLLW, and ILAW disposal on groundwater and surface water are evaluated for a 10,000-year period, although the DOE performance standards only require assessment for the first 1000 years after disposal (DOE 2001f). This document does not address non-radioactive waste that contains ''hazardous'' or ''dangerous'' waste, as defined under the Resource Conservation and Recovery Act (RCRA) of 1976 (42 USC 6901) and Washington State Dangerous Waste regulations (WAC 173-303). Following a previous National Environmental Policy Act (NEPA, 42 USC 4321) review (DOE 1997d), DOE decided to dispose of TRU waste in New Mexico at the Waste Isolation Pilot Plant (WIPP), a repository that meets the requirements of 40 CFR 191 (63 FR 3623). This HSW EIS has been prepared in accordance with NEPA, the DOE implementing procedures for NEPA 10 CFR 1021, and the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508).

  8. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T-1 Cumulative Impacts Effects on the environment that result from the proposed action when added to other past, present, and reasonably foreseeable future actions, regardless of what agency or person undertakes such other actions (40 CFR 1508.7). APPENDIX T SUPPORTING INFORMATION FOR THE SHORT-TERM CUMULATIVE IMPACT ANALYSES This appendix contains the detailed tables that support the short-term cumulative impacts presented in Chapter 6 of this Tank Closure and Waste Management Environmental

  9. Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington

    Office of Environmental Management (EM)

    Summary-1996.HTM[6/27/2011 11:21:59 AM] The National Environmental Policy Act (NEPA) requires Federal agencies to analyze the potential environmental impacts of their proposed actions to assist them in making informed decisions. A similar Washington State law, the State Environmental Policy Act (SEPA), requires State agencies, including the Washington State Department of Ecology (Ecology), to analyze environmental impacts before making decisions that could impact the environment. A major

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Q-1 APPENDIX Q LONG-TERM HUMAN HEALTH DOSE AND RISK ANALYSIS This appendix presents methods and results for assessment of potential human health impacts due to releases of radionuclides and chemicals from the high-level radioactive waste tanks, Fast Flux Test Facility decommissioning, and waste management activities over long periods of time following stabilization or closure. Q.1 INTRODUCTION Adverse impacts on human health and the environment may occur over long periods of time following

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    K-1 APPENDIX K SHORT-TERM HUMAN HEALTH RISK ANALYSIS This appendix presents the methodologies and assumptions used for estimating potential impacts on, and risks to, individuals and the general public from exposure to releases of radioactive and hazardous chemical materials during normal operations and as a result of hypothetical accidents. It also presents the methodology that was used to assess industrial safety. This information is intended to support the public and occupational health and

  12. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chapter 5 ▪ Long-Term Environmental Consequences 5-1163 5.3.3 Ecological Risk This section presents the results of the evaluation of long-term impacts on ecological resources of releases to air and groundwater under the Waste Management alternatives. Risk indices-Hazard Quotient and Hazard Index-were calculated by comparing the predicted dose to the benchmark dose (see Appendix P). Risk indices could not be calculated for soil-dwelling invertebrates, lizards, toads, or birds exposed to organic

  13. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  14. EIS-0222: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared ...

  15. EIS-0113: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13: Final Environmental Impact Statement EIS-0113: Final Environmental Impact Statement Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, ...

  16. Impact Statements

    Broader source: Energy.gov [DOE]

    Reading Room / Final Environment Impact Statements Record of Decision on Bonneville Power Administration’s Lyle Falls Fish Passage Project (DOE/EIS-3790, November 2008). February 2009.

  17. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, ... Department of Energy, "National Environmental Policy Act Implementing Procedures...

  18. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, ... Products." 49 CFR 106, U.S. Department of Transportation, "Rulemaking Procedures...

  19. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. ...

  20. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 APPENDIX V RECHARGE SENSITIVITY ANALYSIS In the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM...

  1. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The TC & WM EIS analysis confirms the Tank Waste Remediation System, Hanford Site, Richland, Washington, Final Environmental Impact Statement (TWRS EIS) (DOE and Ecology 1996) ROD ...

  2. EIS-0089: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement Operation of PUREX and Uranium Oxide Plant Facilities, Hanford Site, Richland, Washington The U.S. Department of Energy developed this statement to evaluate the environmental impacts of resumption of operations of the PUREX/Uranium Oxide facilities at the Hanford Site to produce plutonium and other special nuclear materials for national defense needs. The final environmental impact statement (EIS) consists of

  3. 2011 Annual Planning Summary for Richland Operations Office ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments and Environmental Impact Statements for 2011 and 2012 within the Richland Operations Office (RL) (see also Office of River Protection and Environmental Management). ...

  4. Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes

    Office of Environmental Management (EM)

    1995/01eis0212_cl.html[6/27/2011 1:02:59 PM] Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes DOE/EIS-0212 VOLUME 1 OF 2 VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT SAFE INTERIM STORAGE OF HANFORD TANK WASTES Hanford Site Richland, Washington October, 1995 WASHINGTON STATE DEPARTMENT OF ECOLOGY NUCLEAR WASTE PROGRAM LACEY, WASHINGTON 98503 U.S. DEPARTMENT OF ENERGY RICHLAND OPERATIONS OFFICE RICHLAND, WASHINGTON 99352 Department of Energy Richland, WA 99352

  5. Environmental Impact Statement Explained

    Broader source: Energy.gov [DOE]

    The National Environmental Policy Act (NEPA) requires Federal agencies to prepare an Environmental Impact Statement (EIS) for all major Federal actions that may significantly affect the quality of...

  6. 2012 Annual Planning Summary for Richland Office | Department of Energy

    Energy Savers [EERE]

    Richland Office 2012 Annual Planning Summary for Richland Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Richland Office. PDF icon APS-2012-RL.pdf More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office 2012 Annual Planning Summary for Portsmouth Paducah Project

  7. Programmatic Environmental Impact Statement for Ground Water...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground ...

  8. EIS-0459: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Programmatic Environmental Impact Statement EIS-0459: Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement DOE ...

  9. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) ...

  10. 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of River Protection and Richland Operations Office.

  11. EIS-0481: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic...

  12. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  13. Amended Environmental Impact Statement Filing System Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact ...

  14. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  15. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 1999 EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan April 1, 1999...

  16. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon...

  17. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  18. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  19. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  20. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  1. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  2. Waste Management Programmatic Environmental Impact Statement...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) ...

  3. Environmental Impact Statement Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Environmental Impact Statement Summary This DOE guidance is intended to help EIS preparers draft the EIS summary. PDF icon Environmental Impact Statement Summary More...

  4. Environmental Impact Statements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance Environmental Impact Statements Environmental Impact Statements The documents included on the Environmental Compliance Division webpages have been posted to comply ...

  5. EIS-0310: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, ...

  6. EIS-0396: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear ...

  7. EIS-0515: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Supplemental Draft Environmental Impact Statement EIS-0515: Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, ...

  8. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  9. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  10. EIS-0472: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0472: Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, ...

  11. Environmental Impact Statements and Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the ...

  12. EIS-0288: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  13. EIS-0222: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

  14. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... - w Z C c w z orB w m 1 a a < a W I < J( z l APPENDIX A HERBICIDE BACKGROUND STATEMENTS T ... a t ement s conc e r n i ng the chem i c a l and phy s i c a l p r op e rt i e s , e f f ...

  15. Environmental Impact Statement | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statements DOE/EIS-0473 - W.A. Parish Post-Combustion CO2 Capture and Sequestration Project Notice of Intent (November 2011) Draft Environmental Impact Statement (September 2012) Final Environmental Impact Statement (February 2013) Record of Decision (May 2013) Mitigation Action Plan (June 2013) DOE/EIS-0464 - Lake Charles CCS Project Notice of Intent (April 2011) Draft Environmental Impact Statement (April 2013) Final Environmental Impact Statement (November 2013) Record of Decision

  16. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  17. EIS-0440: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a ...

  18. EIS-0015: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy PDF icon EIS-0015: Final Environmental Impact Statement, volume 1 PDF ...

  19. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  20. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  1. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  2. EIS-0523: Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

  3. DEISCODES. For Environmental Impact Statements

    SciTech Connect (OSTI)

    Widmayer, D.A. [U.S. NRC, Office of Material Safety and Safegaurds, Washington, D.C., (United States)

    1983-01-01

    DEISCODES, the Draft Environmental Impact Statement CODES are five separate FORTRAN codes used to perform the analysis in the Draft Environmental Impact Statement written to support 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste. The five codes are named OPTIONS, GRWATER, INTRUDE, INVERSW, and INVERSI. These codes calculate impact measures associated with the management of Low-Level radioactive Waste (LLW). Three phases of waste management are considered: waste processing, transportation, and disposal, utilizing (1) information on waste characteristics, (2) data and assumptions on disposal technologies and (3) impact calculational methodologies presented in NUREG/CR-1759 and NUREG-0782. The INTRUDE code determines the radiological impacts resulting from potential inadvertent human intrusion into a selected disposal facility containing processed waste as a function of time after disposal. GRWATER calculates the individual exposures resulting from use of contaminated water drawn from various human access locations such as a well that may become contaminated as a result of potential groundwater migration or radionuclides. The OPTIONS code calculates the waste volume-averaged inadvertent intruder impacts, impacts resulting from exposed waste scenarios, as well as those resulting from operational accidents, and those associated with short term consideration such as waste processing and transportation impacts, disposal costs, energy use, land use, etc. INVERSI, calculates the limiting concentrations in waste to meet a specific dose criterion for a disposal facility. INVERSW, calculates disposal facility radionuclide concentrations and inventories to meet specific allowable dose criteria for groundwater migration for the facility design and regionally representative environmental characteristics.

  4. EIS-0491: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  5. EIS-0451: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Environmental Impact Statement EIS-0451: Final Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Area Power...

  6. EIS-0097: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The ...

  7. EIS-0386: Draft Programmatic Environmental Impact Statement ...

    Office of Environmental Management (EM)

    Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact ... would continue under current agency procedures for granting rights-of-way. ...

  8. Site-wide Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWEIS Site-wide Environmental Impact Statement We analyze the potential environmental impacts associated with Laboratory operations and facilities. Contact Environmental...

  9. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 1, 2012 EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR February 8, 2012 EIS-0476: Final Environmental Impact...

  10. EIS-0449: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible...

  11. Site-wide Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWEIS Site-wide Environmental Impact Statement We analyze the potential environmental impacts associated with Laboratory operations and facilities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The Site-wide Environmental Impact Statement forms the backbone of the National Environmental Policy Act documentation for LANL's continued facility operations. Site-wide Environmental Impact Statement The Site-wide

  12. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  13. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31,...

  14. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0218: Final Environmental Impact Statement Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel January 1, 1996 EIS-0214:...

  15. Solar Progammatic Environmental Impact Statement, Volume 1 |...

    Open Energy Info (EERE)

    Progammatic Environmental Impact Statement, Volume 1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Progammatic Environmental...

  16. EIS-0146: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0146: Final Programmatic Environmental Impact Statement Clean Coal Technology Demonstration Program The proposed action evaluated in this PEIS is to continue the Clean Coal ...

  17. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 15, 2015 EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska January 8, 2015 EIS-0481: Draft Programmatic...

  18. EIS-0251: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996)

  19. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs January 1,...

  20. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Project March 1, 2001 EIS-0281: Draft Environmental Impact Statement Summary (Spanish) Laboratorios Nacionales de SandiaNuevo Mexico Declaracion de Impacto Ambiental de...

  1. Environmental Impact Statement Summary (DOE, 1998) | Department...

    Office of Environmental Management (EM)

    More Documents & Publications "Frequently Asked Questions" on the Department of Energy's NEPA Regulations (DOE, 1998) EIS-0456: Final Environmental Impact Statement EIS-0245-SA-01: ...

  2. EIS-0158: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California

  3. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  5. EIS-0459: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0459: Final Programmatic Environmental Impact Statement Hawai'i's Evolution: Hawai'i Powered. Technology Driven. EIS-0459: Amended Notice of ...

  6. West Wide Programmatic Environmental Impact Statement Record...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: West Wide Programmatic Environmental Impact Statement Record of Decision (BLM)Legal...

  7. Environmental Impact Statement Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the requirements of the National Environmental Policy Act (NEPA). PDF icon Environmental Impact Statement Checklist More Documents & Publications National Energy Policy Act Guide...

  8. EIS-0083: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  9. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Environmental Assessments (EA) Environmental Impact Statements (EIS) New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Training NEPA ...

  10. Schedules of Key Environmental Impact Statements

    Broader source: Energy.gov [DOE]

    This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). This chart represents anticipated activity and is not a...

  11. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  12. EIS-0469: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0469: Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS evaluates the environmental impacts of...

  13. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  14. EIS-0333: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact ...

  15. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125 Energy

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits

  16. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  17. EIS-0317-S1: Environmental Impact Statement, Appendices | Department...

    Office of Environmental Management (EM)

    17-S1: Environmental Impact Statement, Appendices EIS-0317-S1: Environmental Impact Statement, Appendices Kangley-Echo Lake Transmission Line Project Appendices BPA is proposing to...

  18. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  19. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  20. EIS-0072: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF ...

  1. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  2. EIS-0397: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to...

  3. EIS-0397: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Final Environmental Impact Statement Lyle Falls Fish Passage Project BPA proposes to fund modifications to the existing Lyle Falls Fishway...

  4. EIS-0414: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC ...

  5. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  6. EIS-0374: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike IIIBiglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to...

  7. EIS-0374: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft...

  8. EIS-0060: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & ...

  9. EIS-0306: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that...

  10. EIS-0290: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential ...

  11. EIS-0171: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville ...

  12. EIS-0125: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement Bonneville Power Administration Intertie Development and Use The Bonneville Power ...

  13. EIS-0116: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon ...

  14. EIS-0123: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0123: Final Environmental Impact Statement Direct Service Industry Options BPA proposes to implement one or more options to reduce load ...

  15. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  16. EIS-0162: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Impact Statement EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs PDF icon EIS-0162-FEIS-Summary.pdf ...

  17. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  18. EIS-0370: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Final Environmental ...

  19. EIS-0073: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon ...

  20. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  1. EIS-0145: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOEEIS-0145, Bonneville ...

  2. EIS-0337: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley ...

  3. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  4. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  5. EIS-0421: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  6. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  7. EIS-0332: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and...

  8. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  9. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  10. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0511: Final Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating...

  11. Title 40 CFR 1502 - Environmental Impact Statement | Open Energy...

    Open Energy Info (EERE)

    Regulation: Title 40 CFR 1502 - Environmental Impact StatementLegal Abstract Subpart 1502 Environmental Impact Statement under Title 40: Protection of Environment of the U.S. Code...

  12. EIS-0378: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has...

  13. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  14. EIS-0093: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0093: Final Environmental Impact Statement Bonneville Power Administration's 1982 Rate Proposal The U.S. Department of Energy's Bonneville Power...

  15. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  16. Electronic Submittal of Environmental Impact Statements to EPA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electronic Submittal of Environmental Impact Statements to EPA (EPA, 2012) Electronic Submittal of Environmental Impact Statements to EPA (EPA, 2012) e-NEPA is the Environmental ...

  17. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  18. EIS-0372: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) ... EIS-0372: Final Environmental Impact Statement PP-89-1 Bangor Hydro-Electric Company

  19. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  20. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  1. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  2. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  3. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  4. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  5. EIS-0485: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  6. EIS-0438: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY This EIS ...

  7. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  8. EIS-0323: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Final Environmental Impact Statement Sacramento Area Voltage Support The Western Area Power Administration's Central Valley Project transmission...

  9. Guidance for Site-wide Environmental Impact Statements | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    guidance for Site-wide Environmental Impact Statements PDF icon Guidance for Site-wide Environmental Impact Statements More Documents & Publications Recommendations on...

  10. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0450: Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada Download Document ...

  11. EIS-0499: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    499: Notice of Intent to Prepare Environmental Impact Statement EIS-0499: Notice of Intent to Prepare Environmental Impact Statement Great Northern Transmission Line Project The ...

  12. Agencies Publish Final Environmental Impact Statement on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West ...

  13. EIS-0064: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Final Environmental Impact Statement EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) PDF icon ...

  14. EIS-0486: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0486: Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Final EIS to evaluate the ...

  15. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  16. EIS-0499: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the ...

  17. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  18. DOE Environmental Impact Statement Public Scoping Meeting on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project DOE Environmental Impact Statement Public Scoping Meeting on ...

  19. EIS-0463: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0463: Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire DOE issued a Draft EIS that evaluates the ...

  20. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  1. EIS-0498: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0498: Draft Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy ...

  2. EIS-0493: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a ...

  3. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare Environmental Impact Statement EIS-0503: Notice of Intent to Prepare Environmental Impact Statement New England Clean Power Link, Vermont DOE announces ...

  4. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California ...

  5. EIS-0270: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  6. EIS-0376: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  7. EIS-0228: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  8. EIS-0496: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0496: Final Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California ...

  9. EIS-0503: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential ...

  10. Draft Environmental Impact Statement Available for Public Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, ...

  11. EIS-0279: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  12. EIS-0488: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the ...

  13. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Notice of Adoption of an Environmental Impact Statement EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, ...

  14. EIS-0501: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0501: Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission ...

  15. Supplemental Analysis for the Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final ...

  16. EIS-0498: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0498: Final Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy ...

  17. EIS-0376: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0500: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Notice of Intent to Prepare Environmental Impact Statement EIS-0500: Notice of Intent to Prepare Environmental Impact Statement Crystal Springs Hatchery Program; Bingham, ...

  19. EIS-0306: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  20. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Draft Environmental Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits ...

  1. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    82-S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  2. EIS-0499: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Final EIS to evaluate the ...

  3. EIS-0217: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  4. EIS-0491: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  5. EIS-0480: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0480: Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam The Bureau of ...

  6. EIS-0271: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  7. EIS-0503: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the ...

  8. EIS-0108: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  9. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  10. EIS-0226: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0226: Final Environmental Impact Statement Decommissioning andor Long-Term Stewardship at the West Valley Demonstration Project and ...

  11. EIS-0504: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent to Prepare Environmental Impact Statement EIS-0504: Notice of Intent to Prepare Environmental Impact Statement Gulf LNG Liquefaction Project, Jackson County, Mississippi The ...

  12. EIS-0068: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: ...

  13. EIS-0436: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, ...

  14. EIS-0243: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  15. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to ...

  16. EIS-0502: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Notice of Intent to Prepare Environmental Impact Statement EIS-0502: Notice of Intent to Prepare Environmental Impact Statement Hot Springs to Anaconda Transmission Line Rebuild ...

  17. EIS-0249: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0297: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  19. DOE - NNSA/NFO -- Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Site-Wide Environmental Impact Statement (EIS) NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Final Site-Wide Environmental Impact Statement (SWEIS) On February 14, 2013, the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. Available electronically and in hard copy, the document can be obtained by clicking on the links below or calling 702-295-3521.

  20. DOE - NNSA/NFO -- Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site-Wide Environmental Impact Statement (EIS) NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Site-Wide Environmental Impact Statement (SWEIS) SWEIS Cover Art On February 14, 2013, the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. Available electronically and in hard copy, the document can be obtained by clicking here or calling 702-295-3521. Stakeholder

  1. EIS-0063: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

  2. EIS-0063: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

  3. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Argonne Site Office (ASO) ASO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 National Environmental Policy Act (NEPA) Documents

  4. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  5. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Berkeley Site Office (BSO) BSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: Email Us National Environmental Policy Act (NEPA) Documents

  6. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  7. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Princeton Site Office (PSO) PSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 National Environmental Policy Act (NEPA) Documents Environmental

  8. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 National Environmental Policy Act (NEPA)

  9. Surplus Plutonium Disposition Supplemental Environmental Impact Statement |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Surplus Plutonium Disposition Supplemental Environmental Impact Statement ANNOUNCEMENT - March 30, 2016 Today I signed the Record of Decision (ROD) for Disposition of Surplus Non-Pit Plutonium for the Final Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (Supplemental EIS). The ROD outlines the Department of Energy's National Nuclear Security Administration (DOE/NNSA) path forward to prepare and process six metric tons

  10. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  11. EIS-0050-S: Final Supplemental Impact Statement | Department of Energy

    Energy Savers [EERE]

    50-S: Final Supplemental Impact Statement EIS-0050-S: Final Supplemental Impact Statement Commercial and Apartment Conservation Service Program, Supplemental PDF icon EIS-0050_SEIS.pdf More Documents & Publications EIS-0095: Final Environmental Impact Statement EIS-0102: Final Environmental Impact Statement EIS-0127

  12. Guidance for Site-wide Environmental Impact Statements (DOE, 1995) |

    Energy Savers [EERE]

    Department of Energy for Site-wide Environmental Impact Statements (DOE, 1995) Guidance for Site-wide Environmental Impact Statements (DOE, 1995) DOE guidance for Site-wide Environmental Impact Statements PDF icon Guidance for Site-wide Environmental Impact Statements More Documents & Publications Recommendations on Alternative Analysis in Site-wide NEPA Reviews (DOE, 1992) EIS-0225: Amended Notice of Intent to Prepare an Environmental Impact Statement EIS-0225-SA-03: Supplement Analysis

  13. EIS-0477: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0477: Notice of Intent to Prepare Environmental Impact Statement San Juan Basin Energy Connect Project, San Juan County, New Mexico and La Plata County, Colorado...

  14. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  15. EIS-0323-S1: Draft Supplement Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0323-S1: Draft Supplement Environmental Impact Statement Sacramento Area Voltage Support Construction and operation has been proposed of approximately 31 to 38 miles...

  16. EIS-0361: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Record of Decision and Floodplain Statement of Findings EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of FloodplainWetlands Involvement...

  17. Magnolia and KMLP Draft Environmental Impact Statement

    Energy Savers [EERE]

    Magnolia LNG and Lake Charles Expansion Projects Draft Environmental Impact Statement Magnolia LNG, LLC and Kinder Morgan Louisiana Pipeline LLC FERC Docket Nos. CP14-347-000 and CP14-511-000 DOE Docket Nos. 12-183-LNG, 13-131-LNG, and 13-132-LNG FERC/EIS-0260D, DOE/EIS-0498 Cooperating Agencies: U.S. Coast Guard U.S. Department of Energy U.S. Department of Transportation Magnolia LNG and Lake Charles Expansion Projects Draft Environmental Impact Statement FERC/EIS-0260D Docket Nos. CP14-347-000

  18. Resource Contingency Program : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  19. EIS-0525: Draft Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Draft Programmatic Environmental Impact Statement EIS-0525: Draft Programmatic Environmental Impact Statement Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Eastern United States The First Responder Network Authority (FirstNet) in the U.S. Department of Commerce, with DOE as a cooperating agency, has prepared a Draft Programmatic Environmental Impact Statement (PEIS) to analyze the potential environmental impacts of a proposal to

  20. EIS-0423-S1: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0423-S1: Draft Supplemental Environmental Impact Statement Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury This SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It analyzes the potential environmental impact for a facility at and in the vicinity of the Waste Isolation Pilot Plant near Carlsbad,

  1. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.

  2. EIS-0364: Decommissioning of the Fast Flux Test Facility, Hanford Site, Richland, WA

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA), on proposed decommissioning of the Fast Flux Test Facility (FFTF) at the Hanford Site, Richland, Washington.

  3. EIS-0375: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0375: Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) ...

  4. EIS-0423-S1: Supplemental Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement for the Long-Term Management and Storage of Elemental Mercury EIS-0423-S1: Supplemental Environmental Impact Statement for the Long-Term Management and Storage ...

  5. EIS-0375: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0375: Final Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) ...

  6. DOE Issues Final Environmental Impact Statement for Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, ...

  7. DOE Issues Final Environmental Impact Statement for Moab, Utah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. ...

  8. EIS-0493: Notice of Adoption of Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adoption of Final Environmental Impact Statement EIS-0493: Notice of Adoption of Final Environmental Impact Statement EPA issued a notice of DOE's adoption of a FERC EIS for a ...

  9. Submitting Environmental Impact Statements (EPA, 2011) | Department of

    Energy Savers [EERE]

    Energy Submitting Environmental Impact Statements (EPA, 2011) Submitting Environmental Impact Statements (EPA, 2011) Guidance from the Environmental Protection Agency's Office of Federal Activities on the filing of EISs. PDF icon Submitting Environmental Impact Statements More Documents & Publications Frequently Asked Questions on Filing EISs with EPA's Office of Federal Activities (EPA, 1994) EIS-0470: EPA Amended Notice of Adoption Amended Environmental Impact Statement Filing System

  10. Environmental Impact Statement Checklist (DOE, 1997) | Department of Energy

    Energy Savers [EERE]

    Checklist (DOE, 1997) Environmental Impact Statement Checklist (DOE, 1997) This DOE Environmental Impact Statement Checklist is provided to assist EIS preparers and reviewers in meeting the requirements of the National Environmental Policy Act (NEPA). PDF icon Environmental Impact Statement Checklist More Documents & Publications Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition (DOE, 2004) 40 CFR 1500-1508: CEQ Regulations

  11. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement

    Energy Savers [EERE]

    | Department of Energy S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement

  12. PIA - Richland Occupational Medicine Contract | Department of...

    Energy Savers [EERE]

    PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational...

  13. EIS-0418: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearing | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  14. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 National Environmental Policy...

  15. EIS-0427: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of...

  16. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  17. EIS-0460: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately 1...

  18. FAO-Environmental Impact Statement Guidelines | Open Energy Informatio...

    Open Energy Info (EERE)

    so as to avoid significant negative impacts of environmental or associated social nature." References "FAO-Environmental Impact Statement Guidelines" Retrieved from...

  19. DOE to Prepare a Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Prepare a Supplemental Environmental Impact Statement for Proposed Surplus Plutonium Disposition at the Savannah River Site DOE to Prepare a Supplemental Environmental Impact ...

  20. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 10 LIST OF PREPARERS U.S. DEPARTMENT OF ENERGY Burandt, Mary Beth EIS Responsibilities: Document Manager Education: M.S., Engineering Management, Catholic University of America B.S., Biomedical Engineering, Marquette University Experience: 27 years Chapin, Doug EIS Responsibilities: Fast Flux Test Facility Lead Education: B.S., Biology, Whitworth College Experience: 34 years Daniels, Jeff EIS Responsibilities: Cost, Schedule, and Baseline and Performance Lead Education: B.A., Finance,

  1. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 TC & WM EIS Proposed Actions (1) Retrieve, treat, and dispose of waste in single-shell tank (SST) and double-shell tank (DST) farms and close the SST system. (2) Decommission the Fast Flux Test Facility, manage the resulting waste, and manage the disposition of the Hanford Site's (Hanford's) inventory of bulk sodium. (3) Manage waste from tank closure and other Hanford activities, as well as limited volumes received from U.S. Department of Energy sites. CHAPTER 2 PROPOSED ACTIONS AND

  2. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 7 ENVIRONMENTAL CONSEQUENCES AND MITIGATION DISCUSSION Chapter 7 discusses environmental consequences that would occur due to implementation of the reasonable alternatives for each of the following: (1) tank waste retrieval, treatment, and disposal and single-shell tank system closure at the Hanford Site (i.e., tank closure); (2) decommissioning of the Fast Flux Test Facility and auxiliary facilities and disposition of the inventory of radioactively contaminated bulk sodium (i.e.,

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 8 POTENTIALLY APPLICABLE LAWS, REGULATIONS, AND OTHER REQUIREMENTS Chapter 8 presents the laws, regulations, and other requirements that apply to the alternatives. Federal, state, and U.S. Department of Energy environmental, safety, and health requirements are summarized in Section 8.1. Permits or licenses that may be required to implement the alternatives are discussed in Section 8.2. Consultations with Federal, state, and local agencies and federally recognized American Indian

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 9 GLOSSARY absorbed dose - The energy imparted to matter by ionizing radiation per unit mass of the irradiated material (e.g., biological tissue). The units of absorbed dose are the rad and the gray. (One rad equals 0.01 grays, which equals 100 ergs per gram of material.) (See erg, gray, ionizing radiation, irradiated, and radiation absorbed dose [rad].) accelerator (particle) - An apparatus for imparting high velocities by electromagnetic or electrostatic means to charged particles

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Table of Contents List of Figures .......................................................................................................................................... xviii List of Tables ............................................................................................................................................. lvii List of Acronyms and Abbreviations ......................................................................................................... cvi Measurement

  6. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  7. EIS-0355: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0355: Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and

  8. Waste Management Programmatic Environmental Impact Statement (WM PEIS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports and Records of Decision | Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of radioactive wastes from past, present, and

  9. EIS-0444: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project

  10. EIS-0444: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0444: Final Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This final environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project

  11. Benchmarking performance: Environmental impact statements in Egypt

    SciTech Connect (OSTI)

    Badr, El-Sayed A.; Zahran, Ashraf A.; Cashmore, Matthew

    2011-04-15

    Environmental impact assessment (EIA) was formally introduced in Egypt in 1994. This short paper evaluates 'how well' the EIA process is working in practice in Egypt, by reviewing the quality of 45 environmental impact statements (EISs) produced between 2000 and 2007 for a variety of project types. The Lee and Colley review package was used to assess the quality of the selected EISs. About 69% of the EISs sampled were found to be of a satisfactory quality. An assessment of the performance of different elements of the EIA process indicates that descriptive tasks tend to be performed better than scientific tasks. The quality of core elements of EIA (e.g., impact prediction, significance evaluation, scoping and consideration of alternatives) appears to be particularly problematic. Variables that influence the quality of EISs are identified and a number of broad recommendations are made for improving the effectiveness of the EIA system.

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  13. LM Issues Final Programmatic Environmental Impact Statement on the Uranium

    Energy Savers [EERE]

    Leasing Program | Department of Energy Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program April 8, 2014 - 6:26pm Addthis What does this project do? Goal 4. Optimize the use of land and assets The U.S. Department of Energy (DOE) has released the Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) to the public. The document can be found

  14. Golden Reading Room: FINAL Environmental Impact Statements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy FINAL Environmental Impact Statements Golden Reading Room: FINAL Environmental Impact Statements Below are electronic versions of Golden Field Office Reading Room documents that were created after November 1, 1996, per the requirements of the Electronic Freedom of Information Act Amendment of 1996. Most documents are available in Adobe Acrobat Portable Document Format (PDF). Final Environmental Impact Statement for the Proposed Abengoa Biorefinery Project, Hugoton, Stevens County,

  15. EIS-0359: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0359: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF6) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky. PDF icon EIS-0359-DEIS-Summary-2003.pdf PDF icon

  16. EIS-0474: Notice of Availability of Draft Environmental Impact Statement |

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0474: EPA Notice of Availability of Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announced the availability of a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land use plan

  17. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Energy Savers [EERE]

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  18. DOE Environmental Impact Statement Public Scoping Meeting on Champlain

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hudson Power Express Transmission Line Project | Department of Energy Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project June 30, 2010 - 3:28pm Addthis Washington, D.C. --The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS)

  19. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  20. Draft Site-Wide Environmental Impact Statement Nevada | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Draft Site-Wide Environmental Impact Statement Nevada Draft site-wide environmental impact statement for the continued operation of the DOE/NNSA Nevada National Security Site and off-site locations in the State of Nevada The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) is pleased to present the "Draft Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security

  1. EIS-0286: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0286: Final Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program The Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. The HSW EIS updates analyses of environmental consequences from previous documents and provides

  2. EIS-0236-S1: Supplemental Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Supplemental Environmental Impact Statement EIS-0236-S1: Supplemental Environmental Impact Statement Stockpile Stewardship and Management This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is

  3. EIS-0447: EPA Notice of Availability Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy EPA Notice of Availability Final Environmental Impact Statement EIS-0447: EPA Notice of Availability Final Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of the Champlain Hudson Power Express Transmission Line Project Final Environmental Impact Statement. Review Period Ends: 09/15/2014. PDF icon EIS-0447-FEIS-EPANOA-2014.pdf More Documents & Publications EIS-0288-S1: Revision to EPA

  4. NNSS Final Site-Wide Environmental Impact Statement (SWEIS) | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration NNSS Final Site-Wide Environmental Impact Statement (SWEIS) Final Site-Wide Environmental Impact Statement (SWEIS) On February 14, 2013, the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. Available electronically and in hard copy, the document can be obtained by clicking on the links below or calling 702-295-3521. Summary Volume 1, Book

  5. EIS-0495: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0495: Notice of Intent to Prepare an Environmental Impact Statement EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project...

  6. Draft Programmatic Environmental Impact Statement for the Non...

    Energy Savers [EERE]

    ... Draft Programmatic Environmental Impact Statement Chapter 1 FirstNet Nationwide Public Safety ... March 2016 1-11 plans, policies, or procedures; and legislative proposals. ...

  7. Closure & Waste Management Environmental Impact Statement (EfS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanlord 'fank Closure & Waste Management Environmental Impact Statement (EfS) ()ctober 2006 Hanford ... PNNL) cyaluations will be conducted agarnst procedures currently in place fbr ...

  8. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2008, Final Planning ReportEnvironmental Impact Statement, Yakima River Basin Water Storage ... Policy Act Implementing Procedures." 40 CFR 61, U.S. Environmental ...

  9. Final Environmental Impact Statement Safe Interim Storage Of...

    Office of Environmental Management (EM)

    Summary-1995.html6272011 12:58:00 PM FINAL ENVIRONMENTAL IMPACT STATEMENT SAFE INTERIM STORAGE ... in their purpose, intent, and procedures, the Washington State Department of ...

  10. LANL Biosafety Level 3 Facility Environmental Impact Statement...

    National Nuclear Security Administration (NNSA)

    Biosafety Level 3 Facility Environmental Impact Statement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  11. Solar Programmatic Environmental Impact Statement Record of Decision...

    Open Energy Info (EERE)

    Programmatic Environmental Impact Statement Record of Decision Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Programmatic...

  12. EIS-0150: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0150: Final Environmental Impact Statement Salt Lake City Area Integrated Projects ... from the Salt Lake City Area Integrated Projects (SLCAIP) hydroelectric power plants. ...

  13. EIS-0373: Draft Environmental Impact Statement, Summary | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon DOEEIS-0373, Department of Energy, Office of Nuclear Energy Science and Technology, Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear ...

  14. EIS-0007: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0007: Draft Environmental Impact Statement Low-BTU Coal Gasification Facility and Industrial Park PDF icon EIS-0007-DEIS.pdf More Documents & Publications EIS-0099: Final ...

  15. EIS-0435: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota PDF icon DOE%20EIS%2004352.pdf More Documents & Publications...

  16. EIS-0427: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by...

  17. EIS-0416: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Ivanpah Solar Electric Generating System The Bureau of Land Management (BLM) has received a proposal from Solar Partners I, II, IV, and...

  18. EIS-0404: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    PDF icon EIS-0404-FEIS-Apps-2010.pdf More Documents & Publications EIS-0496: Final Environmental Impact Statement EIS-0157-SA-01: Supplement Analysis EIS-0496: Draft

  19. EIS-0238: Draft Site-Wide Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico

  20. EIS-0325: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Washington. This project would increase transmission system capacity north of Hanford. Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, DOE...

  1. Salt Wells Geothermal Energy Projects Environmental Impact Statement...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells Geothermal Energy Projects Environmental Impact Statement Abstract Abstract unavailable....

  2. EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT | Department of...

    Energy Savers [EERE]

    EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: Strategic Petroleum Reserve Alabama, Louisiana, Mississippi, and Texas PDF icon EIS-0165DEIS-volume1.pdf PDF icon ...

  3. EIS-0280: Notice of Cancellation of Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Power From Integrated Coal Ore Reduction Project, Provo, Utah The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a...

  4. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  5. EIS-0424: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Klickitat Hatchery Complex Program Download Document PDF icon EIS-0424: Draft Environmental Impact Statement More Documents & Publications EIS-0169-SA-03: Supplement Analysis ...

  6. EIS-0462: Notice of Cancellation of an Environmental Impact Statement...

    Office of Environmental Management (EM)

    Notice of Cancellation of an Environmental Impact Statement Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant Counties, SD The U.S. Department of Energy...

  7. EIS-0285: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Transmission System Vegetation Management Program Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000...

  8. EIS-0103: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0103: Draft Environmental Impact Statement New EnglandHydro-Quebec 450-kV Direct Current Transmission Line Interconnection The Economic Regulatory Administration prepared this ...

  9. EIS-0436: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0436: Draft Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power ...

  10. EIS-0493: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0493: Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  11. EIS-0026-S: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant (WIPP), Carlsbad, New Mexico PDF icon EIS-0026-S: Final Supplemental ... Impact Statement EIS-0026: Mitigation Action Plan EIS-0026: Record of Decision

  12. EIS-0283-S2: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Tennessee Valley Authority (TVA) and other domestic commercial nuclear power reactors. ... PDF icon EIS-0283-S2: Draft Supplemental Environmental Impact Statement (Summary) PDF icon ...

  13. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  14. EIS-0120: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    EIS-0120: Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant, Aiken, South Carolina The U.S. Department of Energy ...

  15. EIS-0426: Site-Wide Environmental Impact Statement for Continued...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy National Nuclear Security Administration Nevada National Security Site and Off-Site ...

  16. EIS-0423-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Management and Storage of Elemental Mercury This Final SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of ...

  17. EIS-0434: Notice of Cancellation of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Interconnection of the Hualapai Valley Solar Project, Mohave County, Arizona Western Area Power Administration is cancelling the preparation of an environmental...

  18. EIS-0285: Final Environmental Impact Statement, Volume 2 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0285: Final Environmental Impact Statement, Volume 2 Bonneville Power Administration Transmission System Vegetation Management Program Volume 2: Appendices Appendix A - ...

  19. EIS-0336: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOEFE for a Presidential Permit ...

  20. EIS-0372: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    (BHE) Northeast Reliability Interconnect This Comment-Response Addendum presents the comments (and associated responses) received on the Draft Environmental Impact Statement for...

  1. Notice of Intent To Prepare an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent To Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement: Federal Register Notice Volume 76, No. ...

  2. Final Supplemental Environmental Impact Statement for a Geologic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, ...

  3. EIS-0365: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    of Findings EIS-0365: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement...

  4. EIS-0085-S: Final Environmental Impact Statement | Department...

    Energy Savers [EERE]

    EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final ...

  5. Usefulness of programmatic environmental impact statements

    SciTech Connect (OSTI)

    Pinkney, F.C.; Downey, K.M. )

    1993-01-01

    Programmatic environmental impact statements (EISs) are comprehensive documents that integrate environmental considerations into planning and operational decisions at the concept level, avoiding the need for repetitive environmental documentation of specific actions. Procedures developed in the programmatic EIS provide a process for incorporating environmental considerations into the planning phase of future actions and assist in determining the type of environmental considerations into the planning phase of future actions and assist in determining the type of environmental documentation necessary. The programmatic EIS project area is divided into recognizable geographic zones. These zones are mapped and an evaluation zone summary sheet is developed for each area that contains an inventory of pertinent information for analysis of environmental issues. On each map and summary sheet, sensitive zones that are adversely affected and/or require mitigation for implementation of proposed actions are easily recognizable. Accompanying narrative provides both insight for mitigating potential impacts within the sensitive areas and how such impacts should be addressed. Additional assistance in evaluating the effects of planned actions is provided by identifying thresholds of significance at which the effect of a proposed action may prompt the need for environmental documentation.

  6. EIS-0473: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts ...

  7. DOE Issues Final Environmental Impact Statement for Disposal of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater-Than-Class C Waste | Department of Energy Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term management of

  8. H.R.S. 343 - Environmental Impact Statements | Open Energy Information

    Open Energy Info (EERE)

    H.R.S. 343 - Environmental Impact StatementsLegal Abstract This statutory chapter sets forth the requirements for environmental impact statements. Published NA Year Signed or...

  9. H.A.R. 11-200 - Environmental Impact Statement Rules | Open Energy...

    Open Energy Info (EERE)

    - Environmental Impact Statement RulesLegal Abstract This regulatory chapter sets forth the rules for environmental impact statements. Published NA Year Signed or Took...

  10. EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department

    Energy Savers [EERE]

    of Energy 3-S1: Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the

  11. EIS-0287: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    : Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed

  12. EIS-0418: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0408: Final Programmatic Environmental Impact Statement EIS-0408: Upper Great Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, issued the Upper Great Plains Wind Energy Final Programmatic EIS, which evaluates issues and potential environmental impacts associated with wind energy development within Western's Upper Great Plains Customer Service

  13. EIS-0447: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0447: Draft Environmental Impact Statement DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border near Champlain, New York, to New York City. PDF icon EIS-0447-DEIS- Volume 1 PDF icon EIS-0447-DEIS- Volume 2 - Appendix

  14. EIS-0453: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0453: Draft Environmental Impact Statement Recapitalization of Infrastructure Supporting Naval Spent Nuclear Fuel Handling at the Idaho National Laboratory DOE prepared this Draft EIS to evaluate the potential environmental impacts associated with recapitalizing the infrastructure needed to ensure the long-term capability of the Naval Nuclear Propulsion Program (NNPP) and to support naval spent nuclear fuel handling capabilities provided by the Expended

  15. EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    Energy Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS

  16. EIS-0413: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0413: Final Environmental Impact Statement The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration (WAPA) as a cooperating agency, prepared this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by WAPA. PDF

  17. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Registration for 2016 Hanford Cleanup Tours Hanford Public Comment Period Hanford Public Comment Period UNITED STATES DEPARTMENT OF ENERGY Richland Operations Office RL2016LogoVert StacyCharboneau Welcome to the Richland Operations Office (RL),

  18. Y-12 Final Site-Wide Environmental Impact Statement Approved...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Final Site-Wide Environmental Impact Statement Approved Y-12 Final Site-Wide...

  19. Draft Environmental Impact Statement for the Disposal of Greater...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Friday, February 18, 2011 Draft Environmental Impact Statement for the Disposal of ... many as 50,000 diagnostic medical procedures every day in the U.S. Today, the ...

  20. Title 40 CFR 1502 Environmental Impact Statement | Open Energy...

    Open Energy Info (EERE)

    impact statement. Published NA Year Signed or Took Effect 2014 Legal Citation 40 C.F.R. 1502 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet...

  1. EIS-0490: Adoption Notice for an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0490: Adoption Notice for an Environmental Impact Statement Boulder CityU.S. 93 Corridor Transportation Improvements, Boulder City, NV Western has adopted the U.S. Department ...

  2. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Energy Savers [EERE]

    EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  3. EPA-- Amended Environmental Impact Statement Filing System Guidance (2012)

    Broader source: Energy.gov [DOE]

    Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Qualitys Regulations Implementing the National Environmental Policy Act

  4. EIS-0303: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0303: Final Environmental Impact Statement High-Level Waste Tank Closure DOE proposes to close the high-level waste (HLW) tanks at the Savannah River Site (SRS) in accordance ...

  5. Amended Environmental Impact Statement Filing System Guidance (EPA, 2012)

    Broader source: Energy.gov [DOE]

    Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality’s Regulations Implementing the National Environmental Policy Act

  6. Draft Nevada National Security Site Environmental Impact Statement Released

    Broader source: Energy.gov [DOE]

    The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011.

  7. EIS-0378: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    PDF icon EIS-0378-DEIS-Summary-2007.pdf PDF icon EIS-0378-DEIS-2007.pdf More Documents & Publications EIS-0378: Final Environmental Impact Statement EIS-0378-SA-01: Supplement ...

  8. EIS-0099: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS-0099: Final Environmental Impact Statement Remedial Actions at the Former Vitro Chemical Company Site, South Salt Lake, Salt Lake County, Utah The U.S. Department of Energy ...

  9. EIS-0283-S2: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Statement This Final SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which a disposition...

  10. EIS-0129: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Draft Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications ...

  11. EIS-0129: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Final Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon ...

  12. EIS-0422: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt...

  13. EIS-0342: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon EIS-0342-FEIS-2004.pdf PDF icon EIS-0342-FEIS-App-2004.pdf PDF icon EIS-0342-FEIS-Figures-2004.pdf More Documents & Publications EIS-0330: Final Environmental Impact Statement...

  14. EIS-0355: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2-SA-02: Supplement Analysis EIS-0222-SA-02: Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement DOE's Supplement Analysis evaluates present and proposed or reasonably foreseeable future programs, operations, and activities in the context of the Hanford Comprehensive Land-use Plan Environmental Impact Statement (HCP-EIS) (DOE/EIS-0222, 1999) and Record of Decision (ROD), and the 2008 HCP-EIS SA (DOE/EIS-0222-SA-01) and amended ROD (73 FR 55824, September 26,

  15. EIS-0359: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0359: Final Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah,

  16. EIS-0360: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah,

  17. EIS-0410: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  18. Agencies Publish Draft Environmental Impact Statement on Energy Transport

    Energy Savers [EERE]

    Corridor Designations in 11 Western States | Department of Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public

  19. DOE Plans Supplemental Environmental Impact Statement for New Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reserve Site in Mississippi | Department of Energy Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi March 5, 2008 - 10:52am Addthis Three Public Meetings Planned Next Month; Supplemental Study to Include Floodplain and Wetlands Assessments WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced plans to prepare a Supplemental

  20. DOE invites public to mercury storage environmental impact statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scoping meeting in Idaho Falls on Tuesday, August 11, 2009. invites public to mercury storage environmental impact statement scoping meeting in Idaho Falls on Tuesday, August 11, 2009. The U.S. Department of Energy issued a Notice of Intent in the July 2, 2009 Federal Register announcing that it will prepare the Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement (Mercury Storage EIS). This EIS will help identify a facility or facilities for storage of

  1. Environmental Impact Statements and Environmental Assessments Status Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process, links to the project pages, and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation

  2. Agencies Publish Draft Environmental Impact Statement on Energy Transport

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corridor Designations in 11 Western States | Department of Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 4:31pm Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public

  3. DOE to Prepare a Supplemental Environmental Impact Statement for Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surplus Plutonium Disposition at the Savannah River Site | Department of Energy to Prepare a Supplemental Environmental Impact Statement for Proposed Surplus Plutonium Disposition at the Savannah River Site DOE to Prepare a Supplemental Environmental Impact Statement for Proposed Surplus Plutonium Disposition at the Savannah River Site March 23, 2007 - 12:10pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) this week sent to the Federal Register a notice announcing that it will

  4. Final Environmental Impact Statement Brings DOE Closer to Disposing Unique

    Energy Savers [EERE]

    Waste | Department of Energy Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste March 16, 2016 - 12:45pm Addthis Theresa Kliczewski, environmental protection specialist in EM’s Office of Disposition Planning and Policy, explains the GTCC EIS path forward to participants in the Waste Management Symposia 2016 in Phoenix. Theresa Kliczewski, environmental protection specialist in

  5. EIS-0244: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  6. EIS-0286: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  7. EIS-0391: Supplement Analysis of an Environmental Impact Statement |

    Office of Environmental Management (EM)

    6: Notice of Additional Public Hearing EIS-0386: Notice of Additional Public Hearing Designation of Energy Corridors on Federal Land in the 11 Western States Additional Public Hearing on the Draft Programmatic Environmental Impact Statement; Designation of Energy Corridors on Federal Land in the 11 Western States PDF icon Additional Public Hearing on the Draft Programmatic Environmental Impact Statement; Designation of Energy Corridors on Federal Land in the 11 Western States, DOE/EIS-0386

  8. EIS-0423: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility,"

  9. EIS-0164: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    4: Final Environmental Impact Statement EIS-0164: Final Environmental Impact Statement Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project PDF icon EIS-0164-FEIS.pdf PDF icon EIS-0164-FEIS-Appendices.pdf PDF icon EIS-0164-FEIS-Comments.pdf More Documents & Publications Response to several FOIA requests - Renewable Energy. QER - Comment of American Public Power Association 7 Energy Assurance Daily (EAD): April 2012

  10. EIS-0360: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    60: Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at

  11. Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement

    National Nuclear Security Administration (NNSA)

    283-S2 April 2015 U.S. Department of Energy Office of Material Management and Minimization and Office of Environmental Management Washington, DC Summary Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement AVAILABILITY OF THE FINAL SURPLUS PLUTONIUM DISPOSITION SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SPD Supplemental EIS) For further information on this SPD Supplemental EIS, or to request a copy, please contact: Sachiko McAlhany, NEPA Document Manager SPD

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITEM 1 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 15-PRO-0175 APR 3 0 205 Mr. J. A. Ciucci, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Ciucci: CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2014 FINAL FEE DETERMINATION FOR PLATEAU REMEDIATION CONTRACT The purpose of this letter is to provide the final fee determination for the FY 2014 evaluation period. Pursuant to the

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  14. Energy Secretary Bodman Statement on Hanford Solid Waste Settlement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agreement | Department of Energy Statement on Hanford Solid Waste Settlement Agreement Energy Secretary Bodman Statement on Hanford Solid Waste Settlement Agreement January 9, 2006 - 9:43am Addthis Richland, WA - U.S. Secretary of Energy Samuel Bodman today announced that the Department of Energy (DOE) and the State of Washington have entered into a settlement agreement that will lead to a final order and the dismissal of the challenge to Hanford's Solid Waste Environmental Impact Statement

  15. EIS-0523 and EIS-0525: Notice of Intent to Prepare an Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Non-Contiguous United States

  16. EIS-0523: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Non-Contiguous United States

  17. EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

  18. EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

  19. EIS-0525: Department of Commerce Notice of Availability of Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Eastern United States

  20. EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  1. EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  2. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 4TESRichland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington...

  3. EIS-0391: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    1500-1508 and 10 CFR Part 1021. Notice of Intent To Prepare the Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, WA, EIS-0391,...

  4. Documentation of cumulative impacts in environmental impact statements

    SciTech Connect (OSTI)

    Cooper, T.A.; Canter, L.W.

    1997-11-01

    The National Environmental Policy Act (NEPA) of 1969 and the Council on Environmental Quality (CEQ) regulations in the United States require federal agencies to apply an environmental impact assessment (EIA) in decision-making related to their actions. One aspect requires an examination of direct, indirect and cumulative impacts (CIs). Historically, cumulative impact assessment (CIA) has been given limited attention in EIA and resultant environmental impact statements (EISs), not because of its lack of importance, but owing to limitations in methodologies and procedures, including documentation consistency. The objectives of this study were to identify deficiencies in the documentation of CIs and CIA in EISs and to formulate appropriate recommendations (potential solutions) related to such deficiencies. The study involved the systematic review of 33 EISs. The results indicate that improvements have been made in documentation practices since 1990; however, inconsistencies and inadequacies still exist. Therefore, the following recommendations were developed: (1) CIs should be reported in a separate part of the Environmental Consequences section, and they should be addressed for each pertinent environmental resource; (2) a summary of CIs should be included; (3) any CIs considered not significant should be mentioned plus the reason(s) for their non-significance; (4) spatial and temporal boundaries addressed within the CIA process should be defined for pertinent environmental resources; and (5) utilized guidelines and methodologies should be described.

  5. EIS-0156: Cowlitz Falls Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

  6. EIS-0447: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0447: Final Environmental Impact Statement DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border near Champlain, New York, to New York City. PDF icon EIS-0447-FEIS-Summary-2014.pdf PDF icon EIS-0447-FEIS-Vol_I-2014.pdf

  7. NEPA - Environmental Impact Statements - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA -

  8. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  9. PIA - Richland Occupational Medicine Contract | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational Medicine Contract More Documents ...

  10. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site, Richland, Washington 5-394 5.2 FFTF DECOMMISSIONING ALTERNATIVES This section ... of alternatives considered to decommission FFTF and auxiliary facilities at Hanford; to ...

  11. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site, Richland, Washington (Final TC & WM EIS) U.S. Department of Energy (DOE) Foreword DOE appreciates the efforts of the Washington State Department of Ecology (Ecology)...

  12. Lake Charles Liquefaction Project Final Environmental Impact Statement

    Energy Savers [EERE]

    Lake Charles Liquefaction Project Final Environmental Impact Statement Trunkline Gas Company, LLC, Lake Charles LNG Company, LLC, and Lake Charles LNG Export Company, LLC FERC Docket Nos. CP14-119-000, CP14-120-000, and CP14-122-000 DOE Docket Nos. 11-59-LNG and 13-04-LNG FERC/EIS-0258F, DOE/EIS-0491 Cooperating Agencies: U.S. Coast Guard U.S. Department of Energy U.S. Department of Transportation Lake Charles Liquefaction Project Final Environmental Impact Statement FERC/EIS-0258F Docket Nos.

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZATESO~'P.O. Box 550 E Richland, Washington 99352 11 -SED-0 124 JUL 0 7 2Mt Mr. J. G. Lehew 111, President and Chief Executive Officer CH2M HILL Plateau Remnediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-ACO6-08RL 14788 - TRANSN4ITTAL OF SURVEILLANCE REPORT PLANNING AND EXECUTION OF RADIOLOGICAL WORK (S-1I l-SFD-CHPRC-PFP-002) Pursuant to Clause E. 1, "DOE Inspection and Acceptance," this letter transmits Surveillance Report S-1 I -SED-CHPRC-PFP-002. The

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 ~4TES~Richland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington 99352 Dear Mr. Figueroa: CONTRACT NO. DE-AC06-09RL 14728 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Section J, Table J-2.9). The HASQARD contains the standards for site sampling and

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ' 5 ~7AE d~Richland, Washington 99352 10-AMSE-0055 APR 0 9 2010 Mr. M. N. Brosee, President Washington Closure Hanford LLC Richland, Washington 99354 Dear Mr. Brosee: CONTRACT NO. DE-AC06-05RL14655 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HAS QARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J-2, List B: Applicable DOE Directives). The HASQARD contains the standards for site sampling and analytical

  16. Planning for quality stewardship: The sitewide environmental impact statement

    SciTech Connect (OSTI)

    Webb, D.

    1995-12-01

    The U.S Department of Energy is responsible for managing many large tracts of Federal land throughout this country. These sites host the nation`s nuclear weapons complex, national laboratories, environmental restoration facilities, and serve other uses. The Department faces unique problems in administering this land. Many have multiple activities taking place at the same time; for example, a site may simultaneously be used for energy research, technology development, waste disposal and wildlife habitat. The sites often use radioactive and other hazardous materials and many are contaminated as a result of past management practices. In 1992 the Department institutes a policy, as stated in its National Environmental Policy Act regulations [10 CFR 1021], to prepare sitewide environmental impact statements for its large, multipurpose sites. For the first time, through the sitewide environmental impact statement process, the Department has an effective tool to plan for quality stewardship of the lands and resources entrusted to its care. The sitewide environmental impact statement is a specialized type of programmatic environmental impact statement which allows the Department to look at the geographically connected actions taking place at a given site. The sitewide statement allows a comprehensive look at the operational baseline for the entire site to determine the total cumulative impact of ongoing operations at the site. The Department can identify areas where a change in management practices would mitigate undesirable impacts; areas not at issue could continue under existing practices. As a result, an environmentally-sound operating envelope can be established. This, in turn, can serve in the future as a threshold to decide if new proposals would result in significant impacts to the site as a whole, to simplify future National Environmental Policy Act reviews.

  17. EIS-0408: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts ...

  18. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  19. Operation of Glen Canyon Dam environmental impact statement

    SciTech Connect (OSTI)

    O`Hare, K.

    1995-12-31

    The final environmental impact statement (EIS) on the operation of Glen Canyon Dam was filed with the Environmental Protection Agency (EPA) by the Bureau of Reclamation on March 21, 1995. The poster display depicts this highly complex EIS process and its results.

  20. EIS-0477: Notice of Availability of Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the San Juan Basin Energy Connect Project (Project) and by this notice is announcing the opening of the comment period.

  1. Sandia National Laboratories Site-Wide Environmental Impact Statement |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Sandia National Laboratories Site-Wide Environmental Impact Statement Documents SNL NOI Federal Register Notice 2011-15951 SNL Facility Poster 1 SNL Facility Poster 2 SNL Facility Poster 3 SNL Fact Sheet SNL SWEIS Fact Sheet

  2. Energy Secretary Bodman Statement on Hanford Solid Waste Settlement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement on Hanford Solid Waste Settlement Agreement Energy Secretary Bodman Statement on Hanford Solid Waste Settlement Agreement January 9, 2006 - 9:43am Addthis Richland, WA - ...

  3. DOE Issues Final Environmental Impact Statement for the FutureGen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, ...

  4. EIS-0189: Tank Waste Remediation System (TWRS), Richland, WA (Programmatic)

    Broader source: Energy.gov [DOE]

    This environmental impact statement evaluates the Department of Energy (DOE)'s, in cooperation with the Washington State Department of Ecology (Ecology), decisions on how to properly manage and dispose of Hanford Site tank waste and encapsulated cesium and strontium to reduce existing and potential future risk to the public, Site workers, and the environment. The waste includes radioactive, hazardous, and mixed waste currently stored in 177 underground storage tanks, approximately 60 other smaller active and inactive miscellaneous underground storage tanks (MUSTs), and additional Site waste likely to be added to the tank waste, which is part of the tank farm system. In addition, DOE proposes to manage and dispose of approximately 1,930 cesium and strontium capsules that are by-products of tank waste. The tank waste and capsules are located in the 200 Areas of the Hanford Site near Richland, Washington.

  5. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4TES~Richland, Washington 99352 August 5, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-01599) You requested, pursuant to the Freedom of Information Act (FOIA), the following informnation: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009 from the Environmental Restoration Disposal Facility (ERDF) at the

  6. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland, Washington 99352 May 3, 2012 CERTIFIED MAIL Mr. Thomas Carpenter Hanford Challenge 219 1 St Avenue South, Suite 120 Seattle, Washington 98104 Dear Mr. Carpenter: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 12-00870) You requested, pursuant to the Freedom of Information Act (FOLA), the following records generated in connection with a surveillance report entitled, "Review of the 100 K Infrastructure Utilities Upgrade Project:" 1. "A copy of the Surveillance report." 2.

  7. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Processing | National Nuclear Security Administration Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), has prepared this Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing to evaluate the potential environmental impacts associated with transporting plutonium from foreign nations to the United States, storing the plutonium at

  8. EIS-0220: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    environmental impact statement (EIS) is for DOE to manage the existing SRS nuclear materials in a safe and environmentally sound manner while supporting national requirements for an inventory at the SRS of usable forms of special isotopes. DOE must consider actions to repackage, relocate, or convert some materials at the SRS to a form appropriate for safe interim storage or future use. The DOE objectives are to (1) eliminate or reduce risks from accidents that could occur during continued

  9. Notice of Availability (NOA) for the Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EIS) and Announcement of Public Hearings for the Proposed Great Northern Transmission Line (GNTL) Project: Federal Register Notice, Volume 80, No. 123 - Jun. 26, 2015 | Department of Energy Great Northern Transmission Line (GNTL) Project: Federal Register Notice, Volume 80, No. 123 - Jun. 26, 2015 Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed Great Northern Transmission Line (GNTL) Project: Federal

  10. Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement

    National Nuclear Security Administration (NNSA)

    Savannah River Site - South Carolina Sequoyah Nuclear Plant - Tennessee Browns Ferry Nuclear Plant - Alabama Waste Isolation Pilot Plant - New Mexico Los Alamos National Laboratory - New Mexico DOE/EIS-0283-S2 July 2012 U.S. Department of Energy Office of Fissile Materials Disposition and Office of Environmental Management Washington, DC AVAILABILITY OF THE DRAFT SURPLUS PLUTONIUM DISPOSITION SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SPD Supplemental EIS) To submit comments on this SPD

  11. Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement

    National Nuclear Security Administration (NNSA)

    SHEET Lead Agency: U.S. Department of Energy (DOE) / National Nuclear Security Administration (NNSA) Cooperating Agency: Tennessee Valley Authority Title: Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS) (DOE/EIS-0283-S2) Locations: South Carolina, New Mexico, Alabama, and Tennessee For further information or for copies of this Draft SPD Supplemental EIS, contact: Sachiko McAlhany, NEPA Document Manager SPD Supplemental EIS U.S. Department

  12. Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement

    National Nuclear Security Administration (NNSA)

    SHEET Lead Agency: U.S. Department of Energy (DOE) / National Nuclear Security Administration (NNSA) Cooperating Agency: Tennessee Valley Authority Title: Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS) (DOE/EIS-0283-S2) Locations: South Carolina, New Mexico, Alabama, and Tennessee For further information or for copies of this Draft SPD Supplemental EIS, contact: Sachiko McAlhany, NEPA Document Manager SPD Supplemental EIS U.S. Department of

  13. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  14. Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    144 December 2014 Page 1 Activity Specific Categorical Exclusion for U.S. Army Training Exercises and Simulations at the Hanford Site, Richland, Washington 1.0 BACKGROUND Title 10, Part 1021 of the Code of Federal Regulations (10 CFR 1021), "National Environmental Policy Act Implementing Procedures," establishes procedures that the U.S. Department of Energy (DOE) uses to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 [42 U.S.C. 4332(2)] and the

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESO~Richland, Washington 99352 August 4, 2009 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford

  16. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Richland, Washington 99352 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn JUN 1 5 2009 P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford Reach

  17. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATES Richland, Washington 99352 CERTIFIED MAIL SEP 1 4 2009 Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) This letter is a partial response to your letters dated June 22, 2009, and July 15, 2009. In response to item 8, you requested "any records and documents relating to the contingency plan required pursuant to Washington Administrative Code Sections 173-303-806,

  18. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    :4Tsc1 ~Richland, Washington 99352 December 18, 2009 CERTIFIED MAIL Ms. Shannon Dininny The Associated Press P.O. Box 1349 Yakima, Washington 98901 Dear Ms. Dininny: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00644) Your Freedom of Information Act (FOIA) request dated December 2, 2009, addressed to the U.S. Department of Energy, Headquarters FOJA Office has been forwarded to this office for response as well as to the DOE Office of Environmental Management (EM), the Oak Ridge Operations Office

  19. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  20. Final Supplemental Environmental Impact Statement for a Geologic Repository

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact

  1. Final Uranium Leasing Program Programmatic Environmental Impact Statement

    Energy Savers [EERE]

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact

  2. New England Clean Power Link Project Environmental Impact Statement

    Energy Savers [EERE]

    FINAL NEW ENGLAND CLEAN POWER LINK PROJECT ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0503 SUMMARY U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY COOPERATING AGENCIES U.S. ENVIRONMENTAL PROTECTION AGENCY U.S. ARMY CORPS OF ENGINEERS U.S. COAST GUARD OCTOBER 2015 This Page Intentionally Left Blank Final New England Clean Power Link EIS U.S. Department of Energy October 2015 i COVER SHEET RESPONSIBLE FEDERAL AGENCY U.S. Department of Energy (DOE), Office of

  3. New England Clean Power Link Project Final Environmental Impact Statement

    Energy Savers [EERE]

    Credits 1. TDI-NE (http://wamc/files/styles/default/public/201410/new-england-clean-power-link-map-ctsy- tdi-new-england.jpg" alt="">) 2. NECPL exit from Lake Champlain (Benson, Vermont) courtesy of TDI-NE 3. Lake Bomoseen, Fair Haven, Vermont courtesy of TDI-NE 4. TDI-NE 2014a 1 3 2 4 FINAL NEW ENGLAND CLEAN POWER LINK PROJECT ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0503 VOLUME II: APPENDICES U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY

  4. Richland Energy Services - Residential Energy Efficiency Rebate...

    Broader source: Energy.gov (indexed) [DOE]

    Program Info Sector Name Utility Administrator City of Richland Website http:www.ci.richland.wa.usindex.aspx?nid174 State Washington Program Type Rebate Program Rebate...

  5. Town of Richland | Open Energy Information

    Open Energy Info (EERE)

    Town of Richland Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Sustainable Energy Development Energy Purchaser Town of Richland Location...

  6. EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and

    Energy Savers [EERE]

    Conduct Scoping Meetings | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming PDF icon EIS-0438-NOI-2010.pdf More Documents & Publications EIS-0438: Draft Environmental Impact Statement EIS-0438: Notice of Cancellation

  7. EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conduct Public Scoping Meetings | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings Champlain Hudson Power Express Transmission Line Project, New York PDF icon Notice of Intent To Prepare an Environmental Impact Statement and To Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement;

  8. EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conduct Public Scoping Meetings | Department of Energy an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings Presidential Permit Application for Northern Pass Transmission, New Hampshire For more information see the project page at: http://energy.gov/node/300109. Download Document PDF icon EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and

  9. EIS-0307: Notice of Intent To Prepare an Environmental Impact Statement and

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  10. Summary Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement

    Office of Environmental Management (EM)

    Environmental Impact Statement Final LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY Final Supplemental Environmental Impact Statement LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY DOE/EIS-0423-S1 September 2013 SUMMARY AND GUIDE FOR STAKEHOLDERS U.S. Department of Energy Office of Environmental Management Washington, DC AVAILABILITY OF THIS FINAL LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT For additional information on this

  11. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

  12. EIS-0119: Decommissioning of Eight Surplus Production Reactors at the Harford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    This EIS presents analyses of potential environmental impacts of decommissioning the eight surplus production reactors at the Hanford Site near Richland, Washington.

  13. EIS-0119: Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EIS presents analyses of potential environmental impacts of decommissioning the eight surplus production reactors at the Hanford Site near Richland, Washington.

  14. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  15. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    SciTech Connect (OSTI)

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  16. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 1, Summary

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public.

  17. EIS-0236-S1: National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial...

  18. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume I

    Energy Savers [EERE]

    Draft Environmental Impact Statement 7.0 Cumulative and Other Impacts 7.2.1 Past Actions Past actions are those actions and their associated impacts that occurred within or influenced the geographic region of influence (ROI) of each resource and have shaped the current affected environment of the proposed Project area. For the purposes of this Environmental Impact Statement (EIS), actions that have occurred in the past and their associated impacts are now part of the existing environment and are

  19. Tank Farm Closure & Waste Management Environmental Impact Statement <br>

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DOE/EIS-0391) - Hanford Site Statements Tank Closure & WM EIS Info Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA - Environmental Impact Statements Environmental Management Performance Reports Tank Farm Closure & Waste Management Environmental Impact Statement (DOE/EIS-0391) Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The U.S. Department of Energy (USDOE) has prepared a Final Environmental

  20. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  1. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  2. Finanacial Statement: WR-FS-09-03

    Broader source: Energy.gov [DOE]

    Report on Matters Identified at the Richland Operations Office during the Audit of The Department of Energy's Consolidated Fiscal Year 1998 Financial Statements

  3. EIS-0435: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative...

  4. EIS-0005: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The...

  5. EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 3: Notice of Intent to Prepare an Environmental Impact Statement EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO DOE's Western Area Power Administration (Western) announces their intent to prepare an EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and

  6. EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 10: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement Calcasieu Pass Project, Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of the Calcasieu Pass Project, a proposed liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana. DOE is a cooperating agency in

  7. EIS-0521: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Notice of Intent to Prepare an Environmental Impact Statement EIS-0521: Notice of Intent to Prepare an Environmental Impact Statement Incorporating Gunnison Sage-Grouse Conservation Measures into Resource Management Plans; Colorado and Utah Bureau of Land Management (BLM) announced its intent to prepare an EIS that will analyze the potential environmental impacts of proposed Resource Management Plan amendments that would incorporate conservation measures for the

  8. EIS-0408: EPA Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  9. Title 43 CFR 1601.0-6 Environmental Impact Statement Policy ...

    Open Energy Info (EERE)

    .0-6 Environmental Impact Statement Policy Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  10. Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has prepared this Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Draft...

  11. EIS-0408: DOE Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  12. DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal...

    Office of Environmental Management (EM)

    Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOEEIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF ...

  13. DOE Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program

    Broader source: Energy.gov [DOE]

    DOE Prepares Programmatic Environmental Impact Statement for the Uranium Leasing Program. Tentatively, DOE is anticipating the Draft PEIS being completed by April 30, 2012, and the Final PEIS being completed by May 24, 2013.

  14. EIS-0466: Site-wide Environmental Impact Statement for the Continued...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National LaboratoriesNew Mexico EIS-0466: Site-wide Environmental Impact Statement for the Continued Operation of Sandia National LaboratoriesNew Mexico Summary This Site-Wide ...

  15. DOE Initiates Environmental Impact Statement for Global Nuclear Energy Partnership Technology Demonstrations

    Broader source: Energy.gov [DOE]

    WASHINGTON , DC - The U.S. Department of Energy (DOE) today announced plans to prepare an environmental impact statement (EIS) for the technology demonstration program of the Global Nuclear Energy...

  16. DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013.

  17. EIS-0454: Notice of Adoption of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement, a 7,680-Acre Right-of-Way (ROW) on Public Lands to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, Nevada. PDF icon Notice of Adoption of the...

  18. EIS-0356: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, WA

  19. AGENCY: ACTION: REVISED FINDING OF NO SIGNIFICANT IMPACT AND FLOODPLAIN STATEMENT OF FINDINGS

    Energy Savers [EERE]

    AGENCY: ACTION: REVISED FINDING OF NO SIGNIFICANT IMPACT AND FLOODPLAIN STATEMENT OF FINDINGS Gila to North Gila Transmission Line Rebuild and Upgrade Project Yuma County, Arizona DOE/EA-1948 U.S. Department of Energy, Western Area Power Administration Revised Finding of No Significant Impact and Floodplain Statement of Findings BACKGROUND: U.S. Department of Energy (DOE), Western Area Power Administration (Western) proposed to rebuild and upgrade the existing 4.8-mile-long Gila to North Gila

  20. Notice of Intent To Prepare an Environmental Impact Statement and Conduct

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement: Federal Register Notice Volume 76, No. 29 - Feb. 11, 2011 | Department of Energy Intent To Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement: Federal Register Notice Volume 76, No. 29 - Feb. 11, 2011 Notice of Intent To Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands

  1. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  2. EIS-0355: Notice of Intent to Prepare an Environmental Impact Statement and

    Office of Environmental Management (EM)

    to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement EIS-0355: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement Remediation of the Moab Uranium Mill Tailings Site in Grand County, UT DOE

  3. Microsoft Word - Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE: Jill Moran, BLM (202) 452-5068 Wednesday, November 26, 2008 Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of

  4. EIS-0372: Notice of Intent to Prepare an Environmental Impact Statement and

    Energy Savers [EERE]

    to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement EIS-0372: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement Bangor Hydro-Electric Company Bangor Hydro-Electric Company (BHE) has

  5. EIS-0380: Final Site-Wide Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Site-Wide Environmental Impact Statement EIS-0380: Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico NNSA proposes to continue operating Los Alamos National Laboratory (LANL), which is located in Los Alamos County in north-central New Mexico. NNSA has identified and assessed three alternatives for continued operation of LANL: (1) No Action, (2) Reduced Operations, and (3) Expanded Operations. Under

  6. Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor

    National Nuclear Security Administration (NNSA)

    FRONT COVER Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor U.S. Department of Energy National Nuclear Security Administration DOE/EIS-0288-S1 August 2014 ACRONYMS AND ABBREVIATIONS CFR Code of Federal Regulations CLWR commercial light water reactor CO2e carbon dioxide equivalent DOE U.S. Department of Energy EIS environmental impact statement EPA U.S. Environmental Protection Agency °F degrees Fahrenheit FR Federal Register

  7. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  8. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  10. DOE/EIS-0222-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement U.S. Department of Energy Richland Operations Office Richland, Washington 99352 June 2008 DOE/EIS-0222-SA-0 1 SUMMARY In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least

  11. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-09-19

    BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

  12. The Rail Alignment Environmental Impact Statement: An Update

    SciTech Connect (OSTI)

    R. Sweeney

    2005-01-20

    On July 23,2002, the President of the United States signed into law a joint resolution of the United States Congress designating the Yucca Mountain site in Nye County, Nevada, for development as a geologic repository for the disposal of spent nuclear fuel and high-level radioactive waste. If the US. Nuclear Regulatory Commission authorizes construction of the repository and receipt and possession of spent nuclear fuel and high-level radioactive at Yucca Mountain, the U.S. Department of Energy (DOE) would be responsible for transporting these materials to the Yucca Mountain repository as part of its obligation under the Nuclear Waste Policy Act. Part of the site recommendation decision included the analysis of a nation-wide shipping campaign to the proposed repository site. The ''Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada'' (February 2002) (Repository EIS) evaluated the potential impacts of the transportation of 70,000 Metric Tons of Heavy Metal spent nuclear fuel and high-level radioactive waste from 77 locations around the nation to the potential repository in Nevada over a 24 year shipping campaign. In the Repository EIS, DOE identified mostly rail as its preferred mode of transportation, both nationally and in the State of Nevada. In December 2003, based on public comments and the environmental analyses in the Repository EIS, DOE identified a preference for the Caliente rail corridor in Nevada. On April 8, 2004, DOE issued a Record of Decision (ROD) on the Mode of Transportation and Nevada Rail Corridor for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada. In this ROD, the DOE announced that it had decided to select the mostly rail scenario analyzed in the Repository EIS as the transportation mode both on a national basis and in the State of Nevada. Under the mostly rail scenario, the DOE would rely on a combination of rail, truck and possibly barge to transport to the repository site at Yucca Mountain up to 70,000 MTHM of spent nuclear fuel and high-level radioactive waste, with most of the spent nuclear fuel and high-level radioactive waste being transported by rail. This will ultimately require construction of a rail line in Nevada to the repository. In addition, the DOE has decided to select the Caliente rail corridor in which to examine potential alignments within which to construct that rail line. A corridor is a strip of land, approximately 400 meters (0.25 miles) wide, that encompasses one of several possible routes through which DOE could build a rail line. An alignment is the specific location of a rail line in a corridor, and would likely be 60 meters [200 feet] or less in width. Also on April 8, 2004, DOE issued a Notice of Intent to Prepare an Environmental Impact Statement for the Alignment, Construction, and Operation of a Rail Line to a Geologic Repository at Yucca Mountain, Nye County, NV. In the Notice of Intent, the Department announced its intent to prepare a Rail Alignment EIS to assist in selecting a possible alignment for construction of a rail line that would connect the repository at Yucca Mountain to an existing main rail line in Nevada. The Rail Alignment EIS also would consider the potential construction and operation of a rail-to-truck intermodal transfer facility, proposed to be located at the confluence of an existing mainline railroad and a highway, to support legal-weight truck transportation until the rail system is fully operational. This corridor is approximately 513 kilometers (319 miles) long and would cost an estimated $880 million (2001 dollars). Should DOE decide to build the Caliente corridor, it may be the longest rail line built in the United States since the Transcontinental Railroad was constructed in 1869. Some of the challenges in building this rail corridor are steep grades (the corridor crosses over 7 mountain ranges), isolated terrain, possible tunnels, and stakeholder acceptance.

  13. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    SciTech Connect (OSTI)

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  14. EIS-0236-S4: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) analyzes the potential environmental impacts of reasonable alternatives to continue transformation of the nuclear weapons complex to be smaller, and more responsive, efficient, and secure in order to meet national security requirements.

  15. Operation of Glen Canyon Dam. Final environmental impact statement, summary, comments and responses

    SciTech Connect (OSTI)

    1995-03-01

    The Federal action considered in this environmental impact statement (EIS) is the operation of Glen Canyon Dam, Colorado River Storage Project (CRSP), Arizona. The purpose of the reevaluation is to determine specific options that could be implemented to minimize--consistent with law-adverse impacts on the downstream environmental and cultural resources, as well as Native American interests in Glen and Grand Canyons.

  16. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site

    Office of Environmental Management (EM)

    Department of Energy Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step

  17. Richland Operations Office Cleanup Strategy, Scope

    Energy Savers [EERE]

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  18. DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has issued the Final Environmental Impact Statement for the FutureGen 2.0 Project.

  19. Final Environmental Impact Statement for Construction and Operation...

    Office of Environmental Management (EM)

    FIGURE S-7 Areas of Potential Impact Evaluated for Each ... This EIS assesses the potential environmental impacts from ... activities consistent with current plans and procedures. ...

  20. Final Environmental Impact Statement for Construction and Operation...

    Office of Environmental Management (EM)

    FIGURE S-6 Areas of Potential Impact Evaluated for Each ... This EIS assesses the potential environmental impacts from ... activities consistent with current plans and procedures. ...

  1. Richland Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Coop Place: Wisconsin Phone Number: (608) 647-3173 Website: www.richec.comindex.html Facebook: https:www.facebook.compagesRichland-Electric-Cooperative156038837800606...

  2. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  3. EIS-0283: Surplus Plutonium Disposition Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium.

  4. EIS-0063: Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the existing tank design and consider additional specific design and safety feature alternatives for the thirteen tanks being constructed for storage of defense high-level radioactive liquid waste at the Hanford Site in Richland, Washington. This statement supplements ERDA-1538, "Final Environmental Statement on Waste Management Operation."

  5. EA-1211: Relocation and Storage of Isotopic Heat Sources, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal for relocation and storage of the isotopic heat sources at the U.S. Department of Energy Hanford Site in Richland, Washington.

  6. EIS-0238-S1: Supplemental Environmental Impact Statement to the Final Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE), Albuquerque Operations Office, has prepared a Supplemental Analysis (SA) to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) adequately addresses the environmental effects of a proposal for modifying current methods utilized to receive and manage certain offsite unwanted radioactive sealed sources at Los Alamos National Laboratory or if additional documentation under the National Environmental Policy Act (NEPA) is needed.

  7. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  8. EIS-0158-S2: Final Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Program Environmental Impact Report for the Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California

  9. EIS-0121: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    EI04~ PRIVACY IMPACT ASSESSMENT: INL PeopleSoft - Human Resource System PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be

  10. EIS-0026-S2: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    * EI04~ PRIVACY IMPACT ASSESSMENT: INL PeopleSoft - Human Resource System PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will

  11. EIS-0337: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    may result from actions to implement the proposed action, including the impacts to the onsite workers and the offsite public from waste transportation and onsite waste management. ...

  12. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    New England Clean Power Link, Vermont DOE announces its intent to prepare an EIS to assess the potential environmental impacts of granting a Presidential permit to construct,...

  13. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to releases of radioactive and hazardous chemical materials during normal operations and ... of the impacts of accidental radioactive material and hazardous chemical releases. ...

  14. EIS-0319: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different...

  15. EIS-0415: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    South Dakota For more information, see the project page: http:energy.govnode302023. EIS-0415-DEIS-2010.pdf More Documents & Publications EIS-0478: Final Environmental Impact...

  16. EIS-0509: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Environmental Management (EM)

    its intent to prepare an EIS that analyzes the potential environmental impacts of proposed liquefied natural gas (LNG) export terminal facilities in Plaquemines Parish, Louisiana. ...

  17. EIS-0349: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic...

  18. EIS-0506: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality ...

  19. EIS-0506: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality ...

  20. EIS-0383: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    social and economic resources, waste management, human health and safety, and noise. The EIS also evaluates potential impacts on these resource areas for a scenario...