National Library of Energy BETA

Sample records for impact statement eis

  1. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  3. EIS-0288: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 1, 2012 EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR February 8, 2012 EIS-0476: Final Environmental Impact...

  5. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  6. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 1999 EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan April 1, 1999...

  7. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon...

  8. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  9. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 15, 2015 EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska January 8, 2015 EIS-0481: Draft Programmatic...

  10. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0218: Final Environmental Impact Statement Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel January 1, 1996 EIS-0214:...

  11. EIS-0459: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0459: Draft Programmatic Environmental Impact Statement Hawai'i's Evolution: Hawai'i Powered. Technology Driven. EIS-0459: Amended Notice of ...

  12. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  13. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  14. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) of NEPA for a proposed major Federal action significantly affecting the quality of the human environment. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD December 18, 2015 EIS-0393: Final Environmental Impact Statement Montanore

  15. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  16. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  17. EIS-0032: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    32: Final Environmental Impact Statement EIS-0032: Final Environmental Impact Statement 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company PDF icon EIS-0032: Final Environmental Impact Statement More Documents & Publications EIS-0097: Final Environmental Impact Statement EIS-0067: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement

  18. EIS-0060: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & Publications EIS-0005: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  19. EIS-0015: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy PDF icon EIS-0015: Final Environmental Impact Statement, volume 1 PDF icon EIS-0015: Final Environmental Impact Statement, volume 2 PDF icon EIS-0015: Final Environmental Impact Statement, volume 3 PDF icon EIS-0015: Final Environmental Impact Statement, volume 4 PDF icon EIS-0015: Final Environmental Impact Statement, volume 5 More Documents & Publications EIS-0093: Final

  20. EIS-0072: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 2 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 3 More Documents & Publications EIS-0025: Final Environmental Impact Statement EIS-0004: Final Environmental Impact Statement EIS-0066

  1. EIS-0370: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Final Environmental Impact Statement (Summary) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 1) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 2) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 3) More Documents & Publications EIS-0370: Draft Environmental Impact Statement EIS-0370:

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Project March 1, 2001 EIS-0281: Draft Environmental Impact Statement Summary (Spanish) Laboratorios Nacionales de SandiaNuevo Mexico Declaracion de Impacto Ambiental de...

  3. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31,...

  4. EIS-0068: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: Final Environmental Impact Statement More Documents & Publications EIS-0070: Draft Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement EIS-0071

  5. EIS-0116: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon EIS-0116-FEIS.pdf More Documents & Publications EIS-0005-FS: Draft Supplemental Environmental Impact Statement EIS-0112: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  6. EIS-0143: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & Publications EIS-0093: Final Environmental Impact Statement EIS-0112: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement

  7. EIS-0370: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental Impact Statement More Documents & Publications EIS-0370: Final Environmental Impact Statement EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement EIS-0400: Draft

  8. EIS-0424: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    4: Draft Environmental Impact Statement EIS-0424: Draft Environmental Impact Statement Klickitat Hatchery Complex Program Download Document PDF icon EIS-0424: Draft Environmental Impact Statement More Documents & Publications EIS-0169-SA-03: Supplement Analysis EIS-0425: Draft Environmental Impact Statement EIS-0425: Final Environmental Impact Statement

  9. EIS-0064: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    4: Final Environmental Impact Statement EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) PDF icon EIS-0064: Final Environmental Impact Statement, volume 1 PDF icon EIS-0064: Final Environmental Impact Statement, volume 2 PDF icon EIS-0064: Final Environmental Impact Statement, volume 3 More Documents & Publications EIS-0089: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement

  10. EIS-0073: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon EIS-0073-FEIS-volume1.pdf PDF icon EIS-0073-FEIS-volume2.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0071

  11. EIS-0129: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon EIS-0129-FEIS-Addendum.pdf More Documents & Publications EIS-0007: Draft Environmental Impact Statement EIS-0125: Final Environmental Impact Statement EIS-0129: Draft

  12. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  13. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  14. EIS-0469: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0469: Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS evaluates the environmental impacts of...

  15. EIS-0423: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Impact Statement, DOEEIS-0423D (January 2010) More Documents & Publications EIS-0423-S1: Draft Supplemental Environmental Impact Statement EIS-0423: Final Environmental Impact...

  16. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  17. EIS-0413: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan PDF icon EIS-0413: Final Environmental Impact Statement - Appendix B-4 - Bat and Bird Conservation Strategy PDF icon EIS-0413: Final Environmental Impact Statement -...

  18. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0511: Final Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating...

  19. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  20. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  1. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0503: Notice of Intent to Prepare Environmental Impact Statement New England Clean Power Link, Vermont DOE announces its intent to prepare an EIS to assess...

  2. EIS-0503: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the...

  3. EIS-0503: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential...

  4. EIS-0050-S: Final Supplemental Impact Statement | Department of Energy

    Energy Savers [EERE]

    50-S: Final Supplemental Impact Statement EIS-0050-S: Final Supplemental Impact Statement Commercial and Apartment Conservation Service Program, Supplemental PDF icon EIS-0050_SEIS.pdf More Documents & Publications EIS-0095: Final Environmental Impact Statement EIS-0102: Final Environmental Impact Statement EIS-0127

  5. EIS-0129: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125

  6. EIS-0007: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    07: Draft Environmental Impact Statement EIS-0007: Draft Environmental Impact Statement Low-BTU Coal Gasification Facility and Industrial Park PDF icon EIS-0007-DEIS.pdf More Documents & Publications EIS-0099: Final Environmental Impact Statement EIS-0093: Final Environmental Impact Statement EIS-0116: Final

  7. EIS-0070: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Draft Environmental Impact Statement EIS-0070: Draft Environmental Impact Statement Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale Facility, Rifle, Garfield County, Colorado PDF icon EIS-0070-DEIS.pdf More Documents & Publications EIS-0068: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0073

  8. EIS-0071: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0071: Final Environmental Impact Statement Memphis Light, Gas and Water Division Industrial Fuels Gas Demonstration Plant, Memphis, Shelby County, Tennessee PDF icon EIS-0071-FEIS.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement EIS-0102

  9. EIS-0085-S: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5-S: Final Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement EIS-0071

  10. EIS-0162: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs PDF icon EIS-0162-FEIS-Summary.pdf PDF icon EIS-0162-FEIS-Volume_1.pdf PDF icon EIS-0162-FEIS-Volume_2_Addendum_Appendices.pdf PDF icon EIS-0162-FEIS-Volume_3.pdf More Documents & Publications EIS-0145: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement EIS-017

  11. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  12. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  13. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  14. EIS-0449: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible...

  15. EIS-0145: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOE/EIS-0145, Bonneville Power Administration, Summary Non-Federal Participation in AC Intertie Final Environmental Impact Statement (January 1994) PDF icon EIS-0145-FEIS-01-1994_0.pdf PDF icon EIS-0145-FEIS-02-1994_0.pdf More Documents & Publications EIS-0197: Final Environmental Impact Statement EIS-0125: Final Environmental Impact

  16. EIS-0026-S: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy S: Final Supplemental Environmental Impact Statement EIS-0026-S: Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Executive Summary PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 1 PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 2 PDF icon

  17. EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT | Department of Energy

    Office of Environmental Management (EM)

    5: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: Strategic Petroleum Reserve Alabama, Louisiana, Mississippi, and Texas PDF icon EIS-0165_DEIS-volume1.pdf PDF icon EIS-0165_DEIS-volume2.pdf PDF icon EIS-0165_DEIS-volume3.pdf More Documents & Publications EIS-0385: Record of Decision and Floodplain Statement of Findings EIS-0075-SA-02: Supplement Analysis EIS-0075-SA-01

  18. EIS-0222: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan This EIS evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. PDF icon EIS-0222-DEISExecutiveSummary-1999.pdf More Documents & Publications EIS-0222: Final Environmental Impact Statement EIS-0222: Record of

  19. EIS-0471: Notice of Adoption of an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Notice of Adoption of an Environmental Impact Statement EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho Download Document PDF icon EIS-0471: Notice of Adoption of an Environmental Impact Statement More Documents & Publications EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement

  20. EIS-0342: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon EIS-0342-FEIS-2004.pdf PDF icon EIS-0342-FEIS-App-2004.pdf PDF icon EIS-0342-FEIS-Figures-2004.pdf More Documents & Publications EIS-0330: Final Environmental Impact Statement...

  1. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  2. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  3. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  4. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  5. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  6. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  7. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  8. EIS-0378: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has...

  9. EIS-0418: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project For more information, see the project page: http:energy.govnode300907....

  10. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  11. EIS-0397: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to...

  12. EIS-0397: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Final Environmental Impact Statement Lyle Falls Fish Passage Project BPA proposes to fund modifications to the existing Lyle Falls Fishway...

  13. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  14. EIS-0286: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide...

  15. EIS-0286: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0286: Final Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program The Hanford Site Solid (Radioactive and...

  16. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  17. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power...

  18. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  19. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  20. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to...

  1. EIS-0491: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory Commission, with DOE...

  2. EIS-0491: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission, with DOE...

  3. EIS-0093: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0093: Final Environmental Impact Statement Bonneville Power Administration's 1982 Rate Proposal The U.S. Department of Energy's Bonneville Power...

  4. EIS-0108: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    108: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  5. EIS-0374: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike IIIBiglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to...

  6. EIS-0374: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft...

  7. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  8. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  9. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Energy Savers [EERE]

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

  10. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Energy Savers [EERE]

    09: Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

  11. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

  12. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  13. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Energy Savers [EERE]

    Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the...

  14. EIS-0332: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and...

  15. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  16. EIS-0306: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  17. EIS-0410: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0410: Final Environmental Impact Statement Keystone Oil Pipeline Project For more information, see the project page: http:energy.govnode304135....

  18. EIS-0323: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Final Environmental Impact Statement Sacramento Area Voltage Support The Western Area Power Administration's Central Valley Project transmission...

  19. EIS-0164: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    4: Final Environmental Impact Statement EIS-0164: Final Environmental Impact Statement Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project PDF icon EIS-0164-FEIS.pdf PDF icon EIS-0164-FEIS-Appendices.pdf PDF icon EIS-0164-FEIS-Comments.pdf More Documents & Publications Response to several FOIA requests - Renewable Energy. EIS-0489: Final Environmental Impact Statement EIS-020

  20. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Safety and Security Policy (SSP) SSP Home About Frequently Used Resources NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Continuity of Operations (COOP) Implementation Plan Contact Information Safety and Security Policy U.S. Department of Energy SC-31/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P:

  1. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Ames Site Office (AMSO) AMSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 National Environmental Policy Act (NEPA) Documents

  2. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Argonne Site Office (ASO) ASO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 National Environmental Policy Act (NEPA) Documents

  3. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  4. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Berkeley Site Office (BSO) BSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: Email Us National Environmental Policy Act (NEPA) Documents

  5. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Training NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements News Safety Data Sheets (SDS) for New Brunswick Laboratory Certified Reference Materials (CRM) Contact Information New Brunswick Laboratory U.S. Department of Energy Building 350

  6. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  7. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) SLAC Site Office (SSO) SSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 National Environmental Policy Act (NEPA) Documents Environmental

  8. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 National Environmental Policy Act (NEPA)

  9. EIS-0495: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0495: Notice of Intent to Prepare an Environmental Impact Statement EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project...

  10. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  11. EIS-0477: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0477: Notice of Intent to Prepare Environmental Impact Statement San Juan Basin Energy Connect Project, San Juan County, New Mexico and La Plata County, Colorado...

  12. EIS-0361: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Record of Decision and Floodplain Statement of Findings EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of FloodplainWetlands Involvement...

  13. EIS-0158: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    58: Final Environmental Impact Statement EIS-0158: Final Environmental Impact Statement Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California (This EIS supplements DOE/EIS-0012.) PDF icon EIS-0158-FEIS.pdf More Documents & Publications EA-0962: Final Environmental Assessment EA-1956: Final Environmental Assessment EIS-0012: Final

  14. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Energy Savers [EERE]

    EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  15. EIS-0251: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0251: Final Environmental Impact Statement Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996) This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. PDF icon EIS-0251-FEIS-1996.pdf More Documents & Publications EIS-0251:

  16. EIS-0421: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon BEK_FEIS_Volume1.pdf PDF icon BEK_FEIS_Volume2_Appendices_Table_of_Contents.pdf PDF icon BEK_FEIS_Volume3_Comments_and_Responses.pdf More Documents & Publications EIS-0421: Record of Decision EIS-0421: Draft Environmental Impact Statement EIS-0421: Record of Decision and Mitigation Action Plan

  17. EIS-0288-S1: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  18. EIS-0288-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0288-S1: Final Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  19. EIS-0464: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and

  20. EIS-0283: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0283: Final Environmental Impact Statement Surplus Plutonium Disposition This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium. PDF icon EIS-0283-Summary-1999.pdf PDF icon EIS-0283-FEIS_Vol1a-1999.pdf PDF icon EIS-0283-FEIS_Vol1b-1999.pdf PDF icon EIS-0283-FEIS_Vol2-1999.pdf PDF icon EIS-0283-FEIS_Vol3a-1999.pdf PDF icon EIS-0283-FEIS_Vol3b-1999.pdf More Documents & Publications

  1. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  2. EIS-0451: Supplemental Draft Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Supplemental Draft Environmental Impact Statement EIS-0451: Supplemental Draft Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an additional route option (3A) that BPA identified when considering comments on the March 2013 Hooper Springs Transmission Project Draft EIS. PDF icon EIS-0451-SDEIS-Vol1-2014.pdf PDF icon EIS-0451-SDEIS-Vol2-2014.pdf PDF icon

  3. EIS-0386: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0386: Final Programmatic Environmental Impact Statement Designation of Energy Corridors on Federal Land in the 11 Western States PDF icon EIS-0386-FEIS-Summary-2008.pdf PDF icon EIS-0386-FEIS-FrontMatter-2008.pdf PDF icon EIS-0386-FEIS-Ch1-2008.pdf PDF icon EIS-0386-FEIS-Ch2-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part1-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part2-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part3-2008.pdf PDF icon

  4. EIS-0063: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0063: Draft Environmental Impact Statement Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington PDF icon EIS-0063-DEIS.pdf More Documents & Publications EIS-0063: Final

  5. EIS-0063: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0063: Final Environmental Impact Statement Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington PDF icon EIS-0063-FEIS.pdf More Documents & Publications EIS-0063: Draft

  6. EIS-0499: Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 499: Notice of Intent to Prepare Environmental Impact Statement EIS-0499: Notice of Intent to Prepare Environmental Impact Statement Great Northern Transmission Line Project The Department of Energy announces its intent to prepare an environmental impact statement (EIS) (DOE/EIS-0499) to assess the potential environmental impacts from its proposed federal action of granting a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new

  7. EIS-0290: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National Environmental and Engineering Laboratory (INEEL). PDF icon Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement, DOE/EIS-0290 (January 1999)

  8. EIS-0375: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Final Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Final GTCC EIS) to evaluate the potential environmental impacts associated with the proposed development, operation, and long-term management of a disposal facility or facilities for GTCC low-level radioactive waste (LLRW) and DOE GTCC-like waste.

  9. EIS-0408: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Final Programmatic Environmental Impact Statement EIS-0408: Final Programmatic Environmental Impact Statement EIS-0408: Upper Great Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, issued the Upper Great Plains Wind Energy Final Programmatic EIS, which evaluates issues and potential environmental impacts associated with wind energy development within Western's Upper Great Plains Customer Service

  10. EIS-0283: Surplus Plutonium Disposition Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 283: Surplus Plutonium Disposition Environmental Impact Statement EIS-0283: Surplus Plutonium Disposition Environmental Impact Statement Summary This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium. Also see Surplus Plutonium Disposition Supplemental EIS (DOE/EIS-0283-S2). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 30,

  11. EIS-0447: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0447: Draft Environmental Impact Statement DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border near Champlain, New York, to New York City. PDF icon EIS-0447-DEIS- Volume 1 PDF icon EIS-0447-DEIS- Volume 2 - Appendix

  12. EIS-0459: Draft Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Draft Programmatic Environmental Impact Statement EIS-0459: Draft Programmatic Environmental Impact Statement DOE prepared a Draft Programmatic EIS to examine the potential environmental impacts of 31 energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in meeting the goals established under the Hawaii Clean Energy Initiative. PDF icon EIS-0459-DEIS-Summary-2014.pdf PDF icon EIS-0459-DEIS-2014.pdf More Documents & Publications

  13. EIS-0485: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power Administration issued a Final EIS that evaluates the potential environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near the city of O'Neill, Nebraska, to Western's power transmission system. PDF icon EIS-0485-FEIS-2014.pdf More Documents & Publications EIS-0485: Notice of

  14. EIS-0333: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact Statement (EIS) evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. PDF icon DOE/EIS-0333, Bonneville Power

  15. EIS-0279: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0279: Final Environmental Impact Statement Spent Nuclear Fuel Management, Aiken, South Carolina The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. PDF icon DOE/EIS-0279,

  16. EIS-0317-S1: Environmental Impact Statement, Appendices | Department of

    Office of Environmental Management (EM)

    Energy 17-S1: Environmental Impact Statement, Appendices EIS-0317-S1: Environmental Impact Statement, Appendices Kangley-Echo Lake Transmission Line Project Appendices BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. PDF icon Kangley-Echo Lake Transmission Line Project Environmental Impact Statement, DOE/EIS-0317 (June 2003) More Documents & Publications EIS-0317: Record of Decision

  17. EIS-0447: EPA Notice of Availability Final Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy EPA Notice of Availability Final Environmental Impact Statement EIS-0447: EPA Notice of Availability Final Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of the Champlain Hudson Power Express Transmission Line Project Final Environmental Impact Statement. Review Period Ends: 09/15/2014. PDF icon EIS-0447-FEIS-EPANOA-2014.pdf More Documents & Publications EIS-0288-S1: Revision to EPA

  18. EIS-0089: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement Operation of PUREX and Uranium Oxide Plant Facilities, Hanford Site, Richland, Washington The U.S. Department of Energy developed this statement to evaluate the environmental impacts of resumption of operations of the PUREX/Uranium Oxide facilities at the Hanford Site to produce plutonium and other special nuclear materials for national defense needs. The final environmental impact statement (EIS) consists of

  19. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  20. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  1. EIS-0280: Notice of Cancellation of Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Power From Integrated Coal Ore Reduction Project, Provo, Utah The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a...

  2. EIS-0474: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration issued a draft EIS...

  3. EIS-0365: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    of Findings EIS-0365: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement...

  4. EIS-0493: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0493: Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  5. EIS-0435: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota PDF icon DOE%20EIS%2004352.pdf More Documents & Publications...

  6. EIS-0097: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    97: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The U.S. Department of Energy's Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program. PDF icon EIS-0097-FEIS.pdf PDF icon EIS-0097-FEIS-Appendices.pdf More Documents

  7. EIS-0113: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    13: Final Environmental Impact Statement EIS-0113: Final Environmental Impact Statement Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, Washington For more information, see the project page: http://energy.gov/node/943036. PDF icon EIS-0113-FEIS-1987_Vol1Part1.pdf PDF icon EIS-0113-FEIS-1987_Vol1Part2.pdf PDF icon EIS-0113-FEIS-1987_Vol2Part1.pdf PDF icon EIS-0113-FEIS-1987_Vol2Part2.pdf PDF icon EIS-0113-FEIS-1987_Vol3Part1.pdf PDF icon

  8. EIS-0464: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0464: Final Environmental Impact Statement Lake Charles Carbon capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This Final Environmental Impact Statement provides information about the potential environmental impacts associated with the Department of Energy's proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration

  9. EIS-0481: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental Impact Statement This Final Programmatic EIS (PEIS) evaluates the potential environmental impacts of implementing one or more programs to catalyze the deployment of engineered high energy crops (EHECs). A main component of the proposed EHEC programs would be providing financial assistance to evaluate the

  10. EIS-0375: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0375: Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Draft GTCC EIS) to evaluate the potential environmental impacts associated with the proposed development, operation, and long-term management of a disposal facility or

  11. EIS-0379 - Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC)

  12. EIS-0444: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project

  13. EIS-0444: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0444: Final Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This final environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project

  14. EIS-0139: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    39: Final Environmental Impact Statement EIS-0139: Final Environmental Impact Statement Trans-Alaska Gas System PDF icon EIS-0139-FEIS-1988.pdf More Documents & Publications Response to several FOIA requests - Renewable Energy. Alaska LNG Project LLC - 14-96-LNG Order 3643: Alaska LNG Project, LLC

  15. EIS-0463: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0463: Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire DOE issued a Draft EIS that evaluates the potential environmental impacts of a proposal by Northern Pass Transmission, LLC (Northern Pass) to construct, operate, maintain, and connect a high voltage direct current electric transmission line that would cross the U.S./Canada border in northern New Hampshire. DOE issued the Draft EIS in July 2015. Northern Pass

  16. EIS-0226: Revised Draft Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS

  17. EIS-0408: Draft Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Wind Energy Programmatic EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service

  18. EIS-0417: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    7: Final Environmental Impact Statement EIS-0417: Final Environmental Impact Statement South Mountain Freeway (Loop 202); Phoenix, Arizona The Federal Highway Administration and the Arizona Department of Transportation issued a Final EIS that evaluates the potential environmental impacts of a proposed new multi-lane freeway in the metropolitan Phoenix area. DOE's Western Area Power Administration, a cooperating agency, would move or reconfigure several transmission line towers. The Final EIS is

  19. EIS-0438: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY This EIS evaluates the potential environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PDF icon EIS-0438-DEIS-Vol1-2012.pdf PDF icon

  20. EIS-0472: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0472: Final Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluated the environmental impacts of management alternatives for DOE's Uranium Leasing Program, under which DOE administers tracts of land in western Colorado for exploration, development, and the extraction of uranium and vanadium ores. PDF icon EIS-0472-FPEIS-Summary-2014.pdf PDF icon

  1. EIS-0505: Supplemental Draft Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 5: Supplemental Draft Environmental Impact Statement EIS-0505: Supplemental Draft Environmental Impact Statement EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington The Bureau of Land Management, with Bonneville Power Administration as a cooperating agency, issued a Supplemental Draft EIS that evaluates the potential environmental impacts of a new route alternative for a proposal to construct a 230-kV

  2. EIS-0306: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that evaluated the potential environmental impacts of treatment and management of DOE-owned sodium bonded spent nuclear fuel. PDF icon EIS-0306-FEIS-Summary-2000.pdf PDF icon EIS-0306-FEIS-Volume1-2000.pdf PDF icon EIS-0306-FEIS-Volume2-2000.pdf More Documents & Publications Annual DOE Occupational Radiation Exposure | 2004

  3. EIS-0099: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    99: Final Environmental Impact Statement EIS-0099: Final Environmental Impact Statement Remedial Actions at the Former Vitro Chemical Company Site, South Salt Lake, Salt Lake County, Utah The U.S. Department of Energy developed this statement to evaluate the environmental impacts of various scenarios associated with the cleanup of those residues remaining at the abandoned uranium mill tailings site located in South Salt Lake, Utah. PDF icon EIS-0099-FEIS-volume1.pdf PDF icon

  4. EIS-0120: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0120: Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant, Aiken, South Carolina The U.S. Department of Energy (DOE) has prepared this environmental impact statement (EIS) to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the

  5. EIS-0282: Notice of Cancellation of the Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 2: Notice of Cancellation of the Environmental Impact Statement EIS-0282: Notice of Cancellation of the Environmental Impact Statement McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by the City of Lakeland to design, construct, and operate a project known as the McIntosh Unit 4 Pressurized Circulating Fluidized Bed

  6. EIS-0284: Notice of Cancellation of Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Cancellation of Environmental Impact Statement EIS-0284: Notice of Cancellation of Environmental Impact Statement Implementation of the Low-Emission Boiler System (LEBS) Proof-of-Concept System, Elkhart, Illinois The Department of Energy (DOE) is cancelling the preparation of an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) for a proposal by Babcock Borsig Power to design, construct, and operate an advanced pulverized

  7. EIS-0340: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes

  8. EIS-0362: Notice of Cancellation of the Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 62: Notice of Cancellation of the Environmental Impact Statement EIS-0362: Notice of Cancellation of the Environmental Impact Statement Colorado Springs Utilities Next-Generation CFB Coal Generating Unit, Fountain, Colorado The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by Colorado Springs Utilities (CSU) to design, construct, and operate a project known as the Next- Generation Circulating Fluidized

  9. EIS-0462: Notice of Cancellation of an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 2: Notice of Cancellation of an Environmental Impact Statement EIS-0462: Notice of Cancellation of an Environmental Impact Statement Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant Counties, SD The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA)

  10. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    | Department of Energy S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement

  11. EIS-0493: Notice of Adoption of Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Notice of Adoption of Final Environmental Impact Statement EIS-0493: Notice of Adoption of Final Environmental Impact Statement EPA issued a notice of DOE's adoption of a FERC EIS for a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas. DOE, Office of Fossil Energy, was a cooperating agency. Document Download PDF icon Notice of Adoption of Final EIS More Documents & Publications

  12. EIS-0515: Supplemental Draft Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 5: Supplemental Draft Environmental Impact Statement EIS-0515: Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, California The Supplemental Draft EIS is posted (multiple files) at http://baydeltaconservationplan.com/2015PublicReview/PublicReviewRDEIRSD.... For more information on this project, see the project page: http://energy.gov/node/1050986. More Documents & Publications EIS-0515: EPA Notice of Availability of

  13. EIS-0287: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0287: Final Environmental Impact Statement Idaho High-Level Waste and Facilities Disposition This EIS analyzes the potential environmental consequences of alternatives for managing high- level waste (HLW) calcine, mixed transuranic waste/sodium bearing waste (SBW) and newly generated liq- uid waste at the Idaho National Engineering and Environmental Laboratory (INEEL) in liquid and solid forms. This EIS also analyzes alternatives for the final disposition

  14. EIS-0488: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export LNG. DOE, a cooperating agency, adopted the EIS.

  15. EIS-0490: Adoption Notice for an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 0: Adoption Notice for an Environmental Impact Statement EIS-0490: Adoption Notice for an Environmental Impact Statement Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder City, NV Western has adopted the U.S. Department of Transportation's Federal Highway Administration's Final EIS on the Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, NV. WAPA was a cooperating agency with the FHWA EIS. PDF icon

  16. EIS-0440: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a summary of changes made based on the comments received during the comment periods for the Draft Environmental Impact Statement (DEIS) and the Draft Resource Management Plan Amendment (DRMPA), which analyzed the impacts associated with the proposed construction, operation, and commissioning of the Quartzsite Solar Energy

  17. EIS-0523: Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

  18. EIS-0400: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal

  19. EIS-0496: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California Western Area Power Administration and the San Luis & Delta-Mendota Water Authority (Authority) as joint federal and state lead agencies, issued a draft EIS/Environmental Impact Report that assesses the potential environmental impacts of the proposed San Luis Transmission Project. Western proposes to construct,

  20. EIS-0447: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0447: Final Environmental Impact Statement DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border near Champlain, New York, to New York City. PDF icon EIS-0447-FEIS-Summary-2014.pdf PDF icon EIS-0447-FEIS-Vol_I-2014.pdf

  1. EIS-0472: Draft Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Draft Programmatic Environmental Impact Statement EIS-0472: Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluates the environmental impacts of management alternatives for DOE's Uranium Leasing Program, under which DOE administers tracts of land in western Colorado for exploration, development, and the extraction of uranium and vanadium ores. At least nine cooperating agencies, including the

  2. EIS-0474: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0474: Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration issued a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New

  3. EIS-0480: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0480: Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam The Bureau of Reclamation and the National Park Service issued a notice of availability of a Draft EIS that analyzes the potential environmental impacts of adopting a proposed Long-Term Experimental and Management Plan for the operation of Glen Canyon Dam in Page, Arizona. For more information, see: http://energy.gov/node/360931. PDF

  4. EIS-0486: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0486: Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Final EIS to evaluate the potential environmental impacts of the proposed Plains & Eastern Project and alternatives to it. The proposed Project would include an overhead ± 600-kilovolt high-voltage direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily

  5. EIS-0489: Notice of Availability for Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 9: Notice of Availability for Final Environmental Impact Statement EIS-0489: Notice of Availability for Final Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) Federal Energy Regulatory Commission (FERC) issued a notice of availability of a Final EIS to analyze the potential environmental impacts of a proposal to construct and operate the Jordan Cove

  6. EIS-0492: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0492: Draft Environmental Impact Statement Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA) Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Draft EIS that analyzes the potential environmental impacts of the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. For more information on this project, see the project page:

  7. EIS-0499: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and

  8. EIS-0499: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and

  9. EIS-0502: Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 2: Notice of Intent to Prepare Environmental Impact Statement EIS-0502: Notice of Intent to Prepare Environmental Impact Statement Hot Springs to Anaconda Transmission Line Rebuild Project, Montana DOE's Bonneville Power Administration (BPA) announced its intent to prepare an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge

  10. EIS-0504: Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Intent to Prepare Environmental Impact Statement EIS-0504: Notice of Intent to Prepare Environmental Impact Statement Gulf LNG Liquefaction Project, Jackson County, Mississippi The Federal Energy Regulatory Commission (FERC) announces its intent to prepare an EIS to analyze the potential environmental impacts of a proposal to expand an existing liquefied natural gas (LNG) import terminal in Jackson County Mississippi and modify related facilities to enable the terminal

  11. EIS-0226: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    6: Final Environmental Impact Statement EIS-0226: Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The Decommissioning and/or Long-Term Stewardship EIS has been prepared in accordance with NEPA and the State Environmental Quality Review Act (SEQR) to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term

  12. EIS-0247: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0247: Draft Environmental Impact Statement Construction and Operation of the Spallation Neutron Source This EIS evaluates the potential environmental impacts of a proposal to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed

  13. EIS-0413: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0413: Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration as a cooperating agency, prepared this Draft EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes

  14. EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 9: Hawaii Clean Energy Programmatic Environmental Impact Statement EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement Summary DOE prepared a programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in meeting the goal established under the Hawaii Clean Energy Initiative to meet 70% of the State's energy needs by 2030 through energy

  15. EIS-0477: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 77: Notice of Intent to Prepare Environmental Impact Statement EIS-0477: Notice of Intent to Prepare Environmental Impact Statement San Juan Basin Energy Connect Project, San Juan County, New Mexico and La Plata County, Colorado The Bureau of Land Management announced its intent to prepare an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kilovolt transmission line from the Farmington area in northwest New Mexico to Ignacio,

  16. EIS-0505: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5: Notice of Intent to Prepare Environmental Impact Statement EIS-0505: Notice of Intent to Prepare Environmental Impact Statement Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington The Bureau of Land Management (BLM) announced its intent to prepare, with U.S. Army Yakima Training Center as a joint lead agency, an EIS that would evaluate the potential environmental impacts of a proposal to construct a

  17. EIS-0146: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 6: Final Programmatic Environmental Impact Statement EIS-0146: Final Programmatic Environmental Impact Statement Clean Coal Technology Demonstration Program The proposed action evaluated in this PEIS is to continue the Clean Coal Technology Demonstration Program (CCTDP) involving the selection, for cost-shared federal funding, of one or more clean coal projects proposed by the private sector. PDF icon DOE/EIS-0146, Department of Energy, DOE, Final Programmatic Environmental Impact

  18. EIS-0200: Waste Management Programmatic Environmental Impact Statement for

    Office of Environmental Management (EM)

    Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste | Department of Energy 0: Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste EIS-0200: Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste SUMMARY This Programmatic EIS evaluates the potential environmental and cost impacts of strategic

  19. EIS-0277: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    7: Final Environmental Impact Statement EIS-0277: Final Environmental Impact Statement Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site This EIS evaluates the potential alternatives and impacts associated with a proposal to process certain plutonium residues and all of the scrub alloy currently stored at Rocky Flats. While ongoing stabilization activities at Rocky Flats are addressing immediate health and safety concerns associated

  20. EIS-0287: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed

  1. EIS-0290: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0290: Draft Environmental Impact Statement U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project This EIS evaluates the potential environmental impacts associated with four alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. Four alternatives were analyzed: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment

  2. EIS-0303: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health

  3. EIS-0391: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA This EIS evaluates the environmental impacts for the following three key areas: (1) retrieval, treatment, and disposal of waste from 149 single-shell tanks (SSTs) and 28 double-shell tanks and closure of the SST system, (2) decommissioning of the Fast Flux Test Facility, a nuclear test reactor, and (3) disposal of Hanford's waste and other DOE

  4. EIS-0394: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0394: Draft Environmental Impact Statement FutureGen Project The EIS provides information about the potential environmental impacts of the DOE's proposal to provide federal funding to FutureGen Alliance, Inc. for the FutureGen Project. The project would include the planning, design, construction, and operation by the Alliance of a coal-fueled electric power and hydrogen gas production plant integrated with carbon dioxide capture and geologic sequestration

  5. EIS-0400: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0400: Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would

  6. EIS-0409: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0409: Draft Environmental Impact Statement Kemper County IGCC Project This Draft EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE's Clean Coal Power Initiative to demonstrate IGCC technology. Mississippi Power also was

  7. EIS-0409: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project This Final EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE's Clean Coal Power Initiative to demonstrate IGCC

  8. EIS-0414: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and

  9. EIS-0419: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0419: Final Environmental Impact Statement Whistling Ridge Energy Project, Skamania County, Washington This EIS evaluates the environmental impacts of a proposal to allow the electrical interconnection of Whistling Ridge Energy, LLC's proposed 75-megawatt (MW) wind project in Skamania County, Washington, to the Federal Columbia River Transmission System. DOE's Bonneville Power Administration will act as the federal lead agency under NEPA and the

  10. EIS-0427: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National

  11. EIS-0431: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0431: Draft Environmental Impact Statement Hydrogen Energy California's (HECA) Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA This EIS evaluates the potential environmental impacts of a proposal to provide financial assistance for the construction and operation of Hydrogen Energy California LLC project, which would produce and sell electricity, carbon dioxide and fertilizer. DOE selected this project

  12. EIS-0436: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0436: Draft Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) issued a draft EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near

  13. EIS-0450: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express Transmission Project and amending a land use plan. The project consists of an overhead

  14. EIS-0451: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV

  15. EIS-0451: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0451: Final Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Area Power Administration issued a Final EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility

  16. EIS-0453: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0453: Draft Environmental Impact Statement Recapitalization of Infrastructure Supporting Naval Spent Nuclear Fuel Handling at the Idaho National Laboratory DOE prepared this Draft EIS to evaluate the potential environmental impacts associated with recapitalizing the infrastructure needed to ensure the long-term capability of the Naval Nuclear Propulsion Program (NNPP) and to support naval spent nuclear fuel handling capabilities provided by the Expended

  17. EIS-0460: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated

  18. EIS-0460: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately $1 billion in cost-shared American Recovery and Reinvestment Act funding to the FutureGen Industrial Alliance, Inc. (Alliance) to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and

  19. EIS-0473: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial

  20. EIS-0473: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0473: Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion carbon dioxide (CO2) Capture and Sequestration Project for a financial assistance award through a competitive process under

  1. EIS-0474: Notice of Availability of Draft Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Availability of Draft Environmental Impact Statement EIS-0474: Notice of Availability of Draft Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announce the availability a draft EIS to evaluate the potential environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would

  2. EIS-0478: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0478: Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota This EIS evaluates the potential environmental impacts of a RUS propoal to construct, operate, and maintain a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration is a cooperating agency. PDF icon

  3. EIS-0478: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0478: Final Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota USDA Rural Utilities Service issued a Final EIS that evaluates the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration, a cooperating agency,

  4. EIS-0486: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the potential environmental impacts of the proposed Plains & Eastern Project and alternatives to it. The proposed Project would include an overhead ± 600-kilovolt high-voltage direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily

  5. EIS-0487: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and associated facilities in Brazoria County, Texas, to

  6. EIS-0487: Notice of Availability of Draft Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Availability of Draft Environmental Impact Statement EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and

  7. EIS-0489: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0489: Final Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Jordan Cove Liquefaction and Pacific Connector Pipeline Projects, respectively a proposed

  8. EIS-0493: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas; a marine berth connecting the terminal to the adjacent La Quinta Channel; and an

  9. EIS-0506: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0506: Draft Environmental Impact Statement Crooked River Valley Rehabilitation Project, Idaho County, Idaho The U.S. Forest Service, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, issued a Draft EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality along approximately 2

  10. EIS-0506: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare Environmental Impact Statement EIS-0506: Notice of Intent to Prepare Environmental Impact Statement Crooked River Valley Rehabilitation Project, Idaho County, Idaho The U.S. Forest Service announced its intent to prepare, with DOE's Bonneville Power Administration as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring

  11. EIS-0509: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 9: Notice of Intent to Prepare Environmental Impact Statement EIS-0509: Notice of Intent to Prepare Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of proposed liquefied natural gas (LNG) export terminal facilities in Plaquemines Parish, Louisiana. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the

  12. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  13. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs January 1,...

  14. EIS-0083: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  15. EIS-0337: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal

  16. EIS-0337: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal

  17. EIS-0426: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0426: Final Environmental Impact Statement This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzed the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada

  18. EIS-0481: Draft Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Draft Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement The Draft PEIS evaluates the potential environmental impacts associated with DOE's Proposed Action to implement one or more programs to catalyze the development and demonstration of crops specifically engineered for increased energy production. A main component of the proposed

  19. EIS-0125: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement Bonneville Power Administration Intertie Development and Use The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long-term Intertie Access Policy, and enabling firm power marketing between California and the Northwest in order to make possible additional short- and long-term

  20. EIS-0250-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0250-S1: Final Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada DOE's Proposed Action is to construct, operate, monitor, and eventually close a geologic repository at Yucca Mountain for the disposal of spent nuclear fuel and high-level radioactive waste. PDF icon EIS-0250-S1-FEIS-Summary-2008.pdf PDF icon

  1. EIS-0433: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0433: Final Environmental Impact Statement Keystone XL Project Summary: The U.S. Department of State has issued the Final EIS for the Keystone XL Project. The proposed action is to construct and operate a crude oil pipeline and related facilities at the international border and continuing into the United States to transport Western Canadian Sedimentary Basin crude oil and other crude oils to a proposed tank farm in Cushing, Oklahoma, and to delivery

  2. EIS-0488: Notice of Availability Draft Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in

  3. EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement Klickitat Hatchery Program, Klickitat and Yakima Counties, WA Download Document PDF icon EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications EIS-0424: Draft Environmental Impact Statement EIS-0424: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0169-SA-08:

  4. EIS-0285: Final Environmental Impact Statement, Volume 2 | Department of

    Office of Environmental Management (EM)

    Energy : Final Environmental Impact Statement, Volume 2 EIS-0285: Final Environmental Impact Statement, Volume 2 Bonneville Power Administration Transmission System Vegetation Management Program Volume 2: Appendices Appendix A - Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM

  5. EIS-0109: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0109: Final Environmental Impact Statement Long-Term Management of the Existing Radioactive Wastes and Residues at the Niagara Falls Storage Site The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several alternatives for management and control of the radioactive wastes and residues at the Niagara Falls Storage Site, including a no action alternative, an alternative to manage wastes on site, and two off-site

  6. EIS-0126: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0126: Final Environmental Impact Statement Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado Note: Appendices A through E and H through M of the Draft Environmental Impact Statement (Volume 2) are incorporated by reference in this FEIS. Modifications to the appendices in response to comments are included in Section 6.0 of the FEIS; Section 6.25 contains an Errata Sheet that reflects

  7. EIS-0103: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Draft Environmental Impact Statement EIS-0103: Draft Environmental Impact Statement New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project

  8. EIS-0105: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Draft Environmental Impact Statement EIS-0105: Draft Environmental Impact Statement Conversion to Coal, Baltimore Gas & Electric Company, Brandon Shores Generating Station Units 1 and 2, Anne Arundel County, Maryland The U.S. Department of Energy's Economic Regulatory Administration Office of Fuels Program, Coal and Electricity Division prepared this statement to assess the potential environmental and socioeconomic impacts associated with prohibiting the use of petroleum products as a

  9. EIS-0236-S1: Supplemental Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Supplemental Environmental Impact Statement EIS-0236-S1: Supplemental Environmental Impact Statement Stockpile Stewardship and Management This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is

  10. EIS-0391: Supplement Analysis of an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 1: Supplement Analysis of an Environmental Impact Statement EIS-0391: Supplement Analysis of an Environmental Impact Statement Draft Tank Closure and Waste Management for the Hanford Site, Richland, WA Based on the analyses in this SA, DOE concluded that updated, modified, or expanded information developed subsequent to the publication of the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington does not

  11. EIS-0021: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Strategic Petroleum Reserve, Seaway Group Salt Domes, Brazoria County, Texas (also see EIS-0075-S and EIS-0029)

  12. EIS-0096: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    96: Final Environmental Impact Statement EIS-0096: Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania This Canonsburg FEIS evaluates the environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington county, Pennsylvania. The Canonsburg site is an 18.5-acre property that was

  13. EIS-0026-S2: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy S2: Final Supplemental Environmental Impact Statement EIS-0026-S2: Final Supplemental Environmental Impact Statement Carlsbad Area Office, Waste Isolation Pilot Plant Disposal Phase SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated

  14. EIS-0082-S2: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0082-S2: Final Supplemental Environmental Impact Statement Savannah River Site Salt Processing This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level

  15. EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007

  16. EIS-0386: Draft Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact Statement Designation of Energy Corridors in the 11 Western States The Draft PEIS analyzes the environmental impacts of designating federal energy corridors on federal land in 11 western states and incorporating those designations into relevant land use and resource management plans. The Draft PEIS analyzes a No Action Alternative and a Proposed Action. Under the No Action Alternative,

  17. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The Bureau of Land Management and the U.S. Forest Service announced their intent to prepare an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. For more information on this project, see the project page: http://energy.gov/node/954651. Download Document PDF icon EIS-0507: Notice of Intent to Prepare Environmental Impact Statement More Documents & Publications

  18. EIS-0222: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared this HCP EIS to evaluate the potential environmental impacts associated with implementing a comprehensive land-use plan (CLUP) for the Hanford Site for at least the next 50 years. The DOE is expected to use this land-use plan in its decision-making process to establish what is the "highest and best use" of the

  19. EIS-0396: Draft Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained

  20. EIS-0121: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    1: Final Environmental Impact Statement EIS-0121: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  1. EIS-0161: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  2. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    85: Final Environmental Impact Statement EIS-0185: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  3. EIS-0217: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  4. EIS-0228: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  5. EIS-0229: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  6. EIS-0243: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  7. EIS-0249: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  8. EIS-0269: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  9. EIS-0270: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  10. EIS-0271: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  11. EIS-0279: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  12. EIS-0297: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  13. EIS-0376: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  14. EIS-0376: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  15. EIS-0247: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0247: Final Environmental Impact Statement Construction and Operation of the Spallation Neutron Source The United States needs a high-flux, short- pulsed neutron source to provide its scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available. This source would assure the availability of a state-of-the-art neutron research facility in the United States in

  16. EIS-0391: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    91: Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA Abstract: The Hanford Site (Hanford), located in southeastern Washington State and situated along the Columbia River, is approximately 1,518 square kilometers (586 square miles) in size. Hanford's mission from the early 1940s to approximately 1989 included defense-related nuclear research, development, and weapons production activities.

  17. EIS-0407: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0407: Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement

  18. EIS-0123: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0123: Final Environmental Impact Statement Direct Service Industry Options BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period

  19. EIS-0150: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0150: Final Environmental Impact Statement Salt Lake City Area Integrated Projects Electric Power Marketing The Western Area Power Administration (Western) proposes to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects (SLCA/IP) hydroelectric power plants. Power generated by the SLCA/IP facilities or purchased by Western from other sources is provided to

  20. EIS-0171: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville Power Administration (BPA) must respond to the need for power as represented by PacifiCorp's request for a continued supply of firm capacity. BPA has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of

  1. EIS-0189: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0189: Final Environmental Impact Statement Tank Waste Remediation System, Hanford Site, Richland, Washington This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. PDF icon

  2. EIS-0201: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement Coyote Springs Cogeneration Project and Portland General Electric Company's Request for Transmission Service The Coyote Springs Cogeneration Project is a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a g-hectare (22-acre) site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440

  3. EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    | Department of Energy S2: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement Stockpile Stewardship and Management for a Modern Pit Facility DOE's NNSA is responsible for the safety and reliability of the U.S. nuclear weapons stockpile, including production readiness required to maintain that stockpile. Pursuant to National Environmental Policy Act of 1969, NNSA has prepared a Supplement to the

  4. EIS-0271: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative

  5. EIS-0303: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    : Final Environmental Impact Statement EIS-0303: Final Environmental Impact Statement High-Level Waste Tank Closure DOE proposes to close the high-level waste (HLW) tanks at the Savannah River Site (SRS) in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste

  6. EIS-0310: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0310: Final Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these

  7. EIS-0336: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0336: Final Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line A DOE Presidential Permit is required before anyone can construct, connect, operate, and maintain an electric transmission line across the U.S. border. On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345-kV) electric transmission line to transmit 500 MW of electricity. The transmission

  8. EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing

  9. EIS-0350-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0350-S1: Final Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico Abstract: NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion

  10. EIS-0360: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah,

  11. EIS-0372: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or

  12. EIS-0378: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    8: Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational

  13. EIS-0399: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at the existing NorthWestern Energy (NWE) 230-kV Switchyard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north

  14. EIS-0403: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 3: Final Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) The BLM and DOE have jointly prepared this PEIS to evaluate actions that the agencies are considering taking to further facilitate utility-scale solar energy development in six southwestern states. For the BLM, this includes the evaluation of a new Solar Energy Program applicable to solar

  15. EIS-0427: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility

  16. EIS-0443: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada

  17. EIS-0476: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Impact Statement EIS-0476: Final Environmental Impact Statement Department of Energy Loan Guarantees for Proposed Units 3 and 4 at the Vogtle Electric Generating Plant, Burke County, GA The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to several applicants to support funding for construction and start-up of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, an advanced nuclear generating facility for the production of electric power (the

  18. EIS-0336: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS

  19. EIS-0505: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  20. EIS-0281: Draft Environmental Impact Statement Summary (Spanish) |

    Office of Environmental Management (EM)

    Department of Energy Statement Summary (Spanish) EIS-0281: Draft Environmental Impact Statement Summary (Spanish) DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and

  1. EIS-0281: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Statement EIS-0281: Draft Environmental Impact Statement DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and Engineering Sciences Applications Complex configuration). PDF icon

  2. EIS-0373: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Statement EIS-0373: Draft Environmental Impact Statement Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Power Systems The purpose and need for agency action is to consolidate RPS production at a single site to reduce the security threat in a cost-effective manner, improve program flexibility, and to reduce interstate transportation of special nuclear material (SNM)1 and other radioactive material. The infrastructure required to produce RPSs currently exists,

  3. EIS-0373: Draft Environmental Impact Statement, Summary | Department of

    Office of Environmental Management (EM)

    Energy Statement, Summary EIS-0373: Draft Environmental Impact Statement, Summary Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Power Systems The purpose and need for agency action is to consolidate RPS production at a single site to reduce the security threat in a cost-effective manner and to reduce interstate transportation of SNM and other radioactive material. The infrastructure required to produce RPSs currently exists, or is planned to exist, at

  4. EIS-0477: Notice of Availability of Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the San Juan Basin Energy Connect Project (Project) and by this notice is announcing the opening of the comment period.

  5. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Due to changes in the proposed route, the Bureau of Land Management and the U.S. Forest Service re initiated scoping for an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. For more information on this project, see the project page: http://energy.gov/node/954651. Download Document PDF icon EIS-0507: Notice of Intent to Prepare Environmental Impact Statement More

  6. EIS-0231: Draft Environmental Impact Statement | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in

  7. EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 441: BLM Notice of Intent to Prepare an Environmental Impact Statement EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement Mohave County Wind Farm Download Document PDF icon EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement EA-1587: Finding of No Significant Impact EA-1665: Final Environmental Assessment and

  8. EIS-0414: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The

  9. EIS-0323-S1: Draft Supplement Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy -S1: Draft Supplement Environmental Impact Statement EIS-0323-S1: Draft Supplement Environmental Impact Statement Sacramento Area Voltage Support Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas

  10. EIS-0379: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    : Draft Environmental Impact Statement EIS-0379: Draft Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line The Libby-Troy transmission line, the 17-mile section of the 115-kilovolt (kV) transmission line that extends from a Flathead Electric Cooperative (FEC) substation near the town of Libby, Montana, to a Bonneville substation near the town of Troy, Montana, is an integral part of the larger 115-kV loop in the

  11. EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 88: Notice of Intent to Prepare an Environmental Impact Statement EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, New Mexico Download Document PDF icon EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final

  12. EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and

    Office of Environmental Management (EM)

    Conduct Scoping Meetings | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming PDF icon EIS-0438-NOI-2010.pdf More Documents & Publications EIS-0438: Draft Environmental Impact Statement EIS-0438: Notice of Cancellation

  13. EIS-0283: Surplus Plutonium Disposition Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium.

  14. EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Program, Klickitat and Yakima Counties, WA PDF icon EIS-0424-NOI-2009.pdf More Documents & Publications EIS-0424: Draft Environmental Impact Statement EIS-0424: EPA Notice of Availability of the Draft Environmental Impact Statement 2012 Annual Planning Summary for Bonneville Power Administration

  15. EIS-0415: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    South Dakota For more information, see the project page: http:energy.govnode302023. EIS-0415-DEIS-2010.pdf More Documents & Publications EIS-0478: Final Environmental Impact...

  16. EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Notice of Adoption of FERC Final Environmental Impact Statement EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the Department of Energy's adoption of the Federal Energy Regulatory Commission's Cameron Liquefaction Project, Cameron Parish, Louisiana Final Environmental Impact Statement. PDF icon EIS-0488-FEIS-DOEAdoption-2014.pdf More Documents & Publications EIS-0447: EPA

  17. EIS-0375: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 75: Notice of Intent to Prepare an Environmental Impact Statement EIS-0375: Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-than-Class C Low-Level Radioactive Waste The Department of Energy (DOE) announces its intent to prepare an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) for the disposal of Greater-Than-Class-C low-level radioactive waste (GTCC LLW). Download Document PDF icon EIS-0375:

  18. EIS-0423: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy : Notice of Intent to Prepare an Environmental Impact Statement EIS-0423: Notice of Intent to Prepare an Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Notice of Intent to prepare an environmental impact statement for the long-term management and storage of elemental mercury in facilities throughout the United States. Download Document PDF icon EIS-0423: Notice of Intent to Prepare an Environmental Impact Statement More Documents

  19. EIS-0466: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0466: Notice of Intent to Prepare an Environmental Impact Statement Continued Operation of the Sandia National Laboratories, New Mexico Download Document PDF icon EIS-0466: Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National

  20. EIS-0423-S1: Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

  1. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  2. EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent To Prepare an Environmental Impact Statement EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada The Bureau of Land Management (BLM) Wyoming State Office, Cheyenne, Wyoming, intends to prepare an Environmental Impact Statement (EIS) analyzing the impacts of a right-of-way (ROW) application for the TransWest Express Transmission Project (Project) and potential

  3. EIS-0495: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0495: Notice of Intent to Prepare an Environmental Impact Statement EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated Tribes of the Umatilla Indian Reservation to construct and operate a hatchery for spring Chinook salmon in

  4. EIS-0423: Notice of Intent to Prepare an Environmental Impact Statement |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Long-Term Management and Storage of Elemental Mercury Notice of Intent to prepare an environmental impact statement for the long-term management and storage of elemental mercury in facilities throughout the United States. PDF icon Notice of Intent to Prepare an Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury, DOE/EIS-0423 (July 2009 - 74 FR 31723) More Documents & Publications EIS-0423: Final Environmental Impact Statement

  5. EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and

    Energy Savers [EERE]

    Conduct Public Scoping Meetings | Department of Energy an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings Presidential Permit Application for Northern Pass Transmission, New Hampshire For more information see the project page at: http://energy.gov/node/300109. Download Document PDF icon EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and

  6. EIS-0226: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0226: Notice of Intent to Prepare an Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning

  7. EIS-0270: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 0: Notice of Intent to Prepare an Environmental Impact Statement EIS-0270: Notice of Intent to Prepare an Environmental Impact Statement Construction and Operation of an Accelerator for the Production of Tritium at the Savannah River Site, Aiken, South Carolina The Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) for the Construction and Operation of an Accelerator for the Production of Tritium at the Savannah River Site

  8. EIS-0271: Notice of Intent To Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 1: Notice of Intent To Prepare an Environmental Impact Statement EIS-0271: Notice of Intent To Prepare an Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah River Site The Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) for construction and operation of a Tritium Extraction Facility (TEF) pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended

  9. EIS-0288: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0288: Notice of Intent to Prepare an Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) for the production of tritium using one or more commercial light water reactors (CLWR). Under the CLWR Program, tritium production could occur in one of two manners: (1) purchase

  10. EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent To Prepare an Environmental Impact Statement EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement Proposed Griffith Power Plant and Transmission Line Project, Mohave County, AZ Western Area Power Administration (Western) intends to prepare an environmental impact statement (EIS) regarding the proposal by Griffith Energy (GE), LLC, to construct an electric generating facility on private property and to interconnect this facility with

  11. EIS-0306: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0306: Notice of Intent to Prepare an Environmental Impact Statement Electrometallurgical Treatment of Sodium-Bonded Spent Nuclear Fuel in the Fuel Conditioning Facility at Argonne National Laboratory-West, Idaho National Engineering and Environmental Laboratory The Department of Energy announces its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act

  12. EIS-0394: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0394: Notice of Intent to Prepare an Environmental Impact Statement Implementation of the FutureGen Project The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA), the Council on Environmental Quality (CEQ) NEPA regulations (40 CFR parts 1500-1508), and the DOE NEPA implementing procedures (10 CFR

  13. EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO PDF icon Western Area Power Administration Notice of Intent to Prepare an Environmental Impact Statement for the Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project, Grand County, CO, EIS-0400 (August 2007) (72 FR 45040)

  14. EIS-0402: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 2: Notice of Intent to Prepare an Environmental Impact Statement EIS-0402: Notice of Intent to Prepare an Environmental Impact Statement Remediation of Area IV of the Santa Susana Field Laboratory The Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) and conduct public scoping meetings under the National Environmental Policy Act (NEPA) for remediation of Area IV of the Santa Susana Field Laboratory (SSFL Area IV). The

  15. EIS-0509: Notice of Intent to Prepare Environmental Impact Statement...

    Energy Savers [EERE]

    EIS that analyzes the potential environmental impacts of proposed liquefied natural gas (LNG) export terminal facilities in Plaquemines Parish, Louisiana. DOE, Office of Fossil...

  16. EIS-0383: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    social and economic resources, waste management, human health and safety, and noise. The EIS also evaluates potential impacts on these resource areas for a scenario...

  17. EIS-0498: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    The EIS also analyzes the potential environmental impacts of the proposed Lake Charles Expansion Project, which would reconfigure an existing pipeline system to serve the LNG ...

  18. EIS-0319: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different...

  19. EIS-0349: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic...

  20. EIS-0393: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issued a Final EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville...

  1. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    New England Clean Power Link, Vermont DOE announces its intent to prepare an EIS to assess the potential environmental impacts of granting a Presidential permit to construct,...

  2. EIS-0321: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Condon Wind Project This EIS evaluates the potential environmental impacts of executing one or more power purchase and transmission services agreements to acquire and transmit up...

  3. EIS-0361: Record of Decision and Floodplain Statement of Findings...

    Broader source: Energy.gov (indexed) [DOE]

    Statement EIS-0361: Final Environmental Impact Statement EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of FloodplainWetlands Involvement...

  4. EIS-0496: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0496: Notice of Intent to Prepare an Environmental Impact Statement DOE's Western Area Power Administration announces its intent to prepare, with the Bureau of Reclamation as a cooperating agency, a joint EIS and environmental impact report to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission

  5. Impact Statements

    Broader source: Energy.gov [DOE]

    Reading Room / Final Environment Impact Statements Record of Decision on Bonneville Power Administrations Lyle Falls Fish Passage Project (DOE/EIS-3790, November 2008). February 2009.

  6. EIS-0497: Notice of Intent to Prepare an Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 7: Notice of Intent to Prepare an Environmental Impact Statement EIS-0497: Notice of Intent to Prepare an Environmental Impact Statement CE FLNG Project, Plaquemines Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announces its intention to prepare, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and

  7. EIS-0508: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 8: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0508: FERC Notice of Intent to Prepare Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of proposed liquefied natural gas (LNG) import and export terminal facilities in Washington County, Maine. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to

  8. EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 10: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement Calcasieu Pass Project, Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of the Calcasieu Pass Project, a proposed liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana. DOE is a cooperating agency in

  9. EIS-0512: Notice of Intent to Prepare an Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 2: Notice of Intent to Prepare an Environmental Impact Statement EIS-0512: Notice of Intent to Prepare an Environmental Impact Statement Alaska LNG Project, Alaska The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a notice of intent to prepare an EIS to analyze the potential environmental impacts of a proposal to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope.

  10. EIS-0513: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Notice of Intent to Prepare Environmental Impact Statement EIS-0513: FERC Notice of Intent to Prepare Environmental Impact Statement Jacksonville Project, Jacksonville, Florida The Federal Energy Regulatory Commission (FERC) issued a notice of intent to prepare an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a natural gas liquefaction, storage, and export facility on the St. Johns River in Jacksonville, Florida. DOE is a

  11. EIS-0436: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 436: Notice of Intent to Prepare an Environmental Impact Statement EIS-0436: Notice of Intent to Prepare an Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) announced its intent to prepare an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would

  12. EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: Notice of Intent to Prepare an Environmental Impact Statement EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Department of the Interior's Bureau of Land Management and Department of Energy's Western Area Power Administration as joint lead agencies announce their intent to prepare an EIS to analyze the potential impacts of a proposed 345-kilovolt (kV) and 230-kV transmission line

  13. EIS-0489: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 89: Notice of Intent to Prepare an Environmental Impact Statement EIS-0489: Notice of Intent to Prepare an Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, Oregon) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, Oregon) This FERC EIS will evaluate the potential environmental impacts of Jordan Cove Energy Project LP, (Jordan Cove) proposed liquefaction project in Coos County, Oregon, and Pacific Connector

  14. EIS-0491: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 91: Notice of Intent to Prepare an Environmental Impact Statement EIS-0491: Notice of Intent to Prepare an Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, LA The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to expand an existing liquefied natural gas (LNG) import terminal in Calcasieu Parish, Louisiana, by constructing and

  15. EIS-0492: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2: Notice of Intent to Prepare an Environmental Impact Statement EIS-0492: Notice of Intent to Prepare an Environmental Impact Statement Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA) The Federal Energy Regulatory Commission (FERC), along with DOE as a cooperating agency, announces its intent to prepare an an EIS to analyze the potential environmental impacts of proposals (1) to add liquefaction and export

  16. EIS-0497: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 7: Notice of Intent to Prepare an Environmental Impact Statement EIS-0497: Notice of Intent to Prepare an Environmental Impact Statement CE FLNG Project, Plaquemines Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announces its intention to prepare, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and

  17. EIS-0436: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0436: Notice of Intent to Prepare an Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) announced its intent to prepare an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run

  18. EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 3: Notice of Intent to Prepare an Environmental Impact Statement EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO DOE's Western Area Power Administration (Western) announces their intent to prepare an EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and

  19. EIS-0485: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0485: Notice of Intent to Prepare an Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power Adminstration announces their intent to prepare an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near the city of O'Neill, Nebraska, to Western's power transmission system.

  20. EIS-0494: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 4: Notice of Intent to Prepare an Environmental Impact Statement EIS-0494: Notice of Intent to Prepare an Environmental Impact Statement Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun and Jackson Counties, Texas The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal consisting of two

  1. EIS-0423-S1: Supplemental Environmental Impact Statement for...

    Energy Savers [EERE]

    Impact Statement for the Long-Term Management and Storage of Elemental Mercury Public Comment Opportunities No public comment opportunities available at this time....

  2. EIS-0372: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    (BHE) Northeast Reliability Interconnect This Comment-Response Addendum presents the comments (and associated responses) received on the Draft Environmental Impact Statement for...

  3. EIS-0325: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Washington. This project would increase transmission system capacity north of Hanford. Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, DOE...

  4. EIS-0250-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada...

  5. EIS-0434: Notice of Cancellation of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Interconnection of the Hualapai Valley Solar Project, Mohave County, Arizona Western Area Power Administration is cancelling the preparation of an environmental...

  6. EIS-0285: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Transmission System Vegetation Management Program Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000...

  7. EIS-0416: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Ivanpah Solar Electric Generating System The Bureau of Land Management (BLM) has received a proposal from Solar Partners I, II, IV, and...

  8. EIS-0238: Draft Site-Wide Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico

  9. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Due to changes in the proposed route, the Bureau of Land Management and the U.S. Forest Service re initiated scoping for an EIS to evaluate the potential environmental impacts of a...

  10. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Bureau of Land Management and the U.S. Forest Service announced their intent to prepare an EIS to evaluate the potential environmental impacts of a proposal to construct a new...

  11. EIS-0488: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles...

  12. EIS-0423-S1: Supplemental Environmental Impact Statement for the Long-Term

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management and Storage of Elemental Mercury | Department of Energy -S1: Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury EIS-0423-S1: Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury SUMMARY This SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It will analyze the potential environmental impact for a

  13. EIS-0466: Site-wide Environmental Impact Statement for the Continued

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operation of Sandia National Laboratories/New Mexico | Department of Energy 6: Site-wide Environmental Impact Statement for the Continued Operation of Sandia National Laboratories/New Mexico EIS-0466: Site-wide Environmental Impact Statement for the Continued Operation of Sandia National Laboratories/New Mexico Summary This Site-Wide EIS evaluates the continued operation of the DOE/NNSA activities at Sandia National Laboratories. The SWEIS will consider a No Action Alternative, which is to

  14. EIS-0498: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 8: Notice of Intent to Prepare an Environmental Impact Statement EIS-0498: Notice of Intent to Prepare an Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a notice of intent to prepare an EIS for a proposal to build and operate a liquefied natural gas (LNG) facility on land at the Port of Lake Charles. (DOE became a cooperating agency after this notice was

  15. DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)

    Office of Environmental Management (EM)

    8 U.S. Department of Energy, Office of Nuclear Energy DOE/EIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement October 2008 Summary Prepared by: DOE/EIS-0396 SUMMARY Summary GNEP Draft PEIS S-i Table of Contents S.1 INTRODUCTION................................................................................................................... 1 S.1.1 Purpose and Need

  16. EIS-0399: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0399: Notice of Intent to Prepare an Environmental Impact Statement Presidential Permit Application for Montana Alberta Tie Transmission Line Project The Department of Energy (DOE) announces its intention to prepare an EIS and to conduct scoping on the proposed Federal action of granting a Presidential permit to construct a new electric transmission line across the U.S.-Canada border in northwestern

  17. EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and

    Energy Savers [EERE]

    Conduct Public Scoping Meetings | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings Champlain Hudson Power Express Transmission Line Project, New York PDF icon Notice of Intent To Prepare an Environmental Impact Statement and To Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement;

  18. EIS-0431: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 431: Notice of Intent to Prepare an Environmental Impact Statement EIS-0431: Notice of Intent to Prepare an Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA Notice of Intent to prepare an environmental impact statement for providing financial assistance for the construction and operation of an integrated gasification combined cycle project proposed by Hydrogen

  19. EIS-0426: Draft Site-Wide Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Draft Site-Wide Environmental Impact Statement EIS-0426: Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada Abstract: This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzes the potential environmental

  20. EIS-0356: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0356: Notice of Intent to Prepare an Environmental Impact Statement Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, WA, The U.S. Department of Energy (DOE) intends to prepare an environmental impact statement (EIS) on the proposed retrieval, treatment, and disposal of the waste being managed in the high-level waste (HLW) tank farms at the

  1. EIS-0422: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt...

  2. EIS-0283-S2: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Statement This Final SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which a disposition...

  3. EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    DOE prepared a programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in meeting the goal established under the Hawaii Clean Energy Initiative to meet 70% of the State’s energy needs by 2030 through energy efficiency and renewable energy.

  4. EIS-0361: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IS-0361-FEIS-01-2007.pdf PDF icon EIS-0361-FEIS-02-2007.pdf PDF icon EIS-0361-FEIS-03-2007.pdf PDF icon EIS-0361-FEIS-Figures-2007.pdf More Documents & Publications EIS-0361: Draft...

  5. EIS-0156: Cowlitz Falls Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

  6. EIS-0340: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0340-NOI-2001.pdf More Documents & Publications EIS-0340: Draft Environmental Impact Statement EIS-0340: Record of Decision EIS-0340: Final Environmental Impact Statement...

  7. EIS-0470: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendix B - Agency Correspondence PDF icon EIS-0470-FEIS- Appendix C - Storm Water Pollution Prevention Plan PDF icon EIS-0470-FEIS- Appendix D - Oil Spill Response Plan PDF...

  8. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS is available at: http:www.blm.govwysteninfoNEPAdocumentshddtranswestFEIS.html. More Documents & Publications EIS-0450: BLM and WAPA Notice of Availability of a Final...

  9. EIS-0433-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on the State Department's website: http:keystonepipeline-xl.state.govdraftseisindex.htm PDF icon EIS-0433-S1-DSEIS-Summary-2013.pdf More Documents & Publications EIS-0410:...

  10. EIS-0281: Final Site-Wide Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Final Site-Wide Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement Sandia National Laboratories/New Mexico DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative

  11. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie Wind Farm

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm Holt County, Nebraska December 2014 COVER SHEET LEAD FEDERAL AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) TITLE: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska, DOE/EIS- 0485 CONTACT: For additional information on this Final Environmental Impact Statement (FEIS), contact: Matt Marsh Environmental Protection Specialist Western Area Power

  12. EIS-0387: Draft Site-Wide Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Draft Site-Wide Environmental Impact Statement EIS-0387: Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The NNSA, a separately organized agency within the DOE, has the responsibility to maintain the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge,

  13. EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada | Department of Energy 6: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy /

  14. EIS-0442: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 442: Notice of Intent to Prepare an Environmental Impact Statement EIS-0442: Notice of Intent to Prepare an Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah PDF icon Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System

  15. EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Conduct Scoping Meetings | Department of Energy 69: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings Wilton IV Wind Energy Center; Burleigh County, North Dakota NextEra Energy Resources (NextEra) applied to interconnect its proposed 99-megawatt (MW) Wilton IV Wind Energy Center Project (Project) with Western Area Power Administration's

  16. EIS-0250-S1: Final Supplemental Environmental Impact Statement for a

    Office of Environmental Management (EM)

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada | Department of Energy 50-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada EIS-0250-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

  17. EIS-0279: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy Notice of Intent to Prepare an Environmental Impact Statement EIS-0279: Notice of Intent to Prepare an Environmental Impact Statement Savannah River Site Spent Nuclear Fuel Management, Aiken, South Carolina DOE needs to safely and efficiently manage all aluminum-clad spent nuclear fuel and targets assigned to the SRS until ultimate disposition. The management alternatives could involve the use of existing, modified, or new facilities or processes, consistent with DOE

  18. EIS-0372: Notice of Intent to Prepare an Environmental Impact Statement and

    Office of Environmental Management (EM)

    to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement | Department of Energy Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement EIS-0372: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement Bangor Hydro-Electric Company Bangor Hydro-Electric Company (BHE) has

  19. EIS-0387: Final Site-Wide Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 7: Final Site-Wide Environmental Impact Statement EIS-0387: Final Site-Wide Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, TN NNSA, a separately organized agency within DOE, is responsible for maintaining the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge,

  20. EIS-0026-S: Supplemental Environmental Impact Statement Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Environmental Restoration and Waste Management prepared this statement to update the environmental record established during preparation of DOE/EIS-0026, Waste Isolation Pilot Plant, by evaluating the environmental impacts associated with new information, new circumstances, and modifications to the actions evaluated in DOE/EIS-0026 that were proposed in light of the new information.

  1. EIS-0423-S1: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    when making long-term elemental mercury management and storage decisions. EIS-0423-S1-FEIS-Summary-2013.pdf EIS-0423-S1-FEIS-2013.pdf More Documents & Publications...

  2. EIS-0483: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado Western Area Power Administration prepared a draft EIS that analyzes the potential...

  3. EIS-0502: Notice of Intent to Prepare Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Hot Springs to Anaconda Transmission Line Rebuild Project, Montana DOE's Bonneville Power Administration (BPA) announced its intent to prepare an EIS that will analyze the...

  4. EIS-0355: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and off-site disposal at one of three alternative locations in Utah using one or more transportation options: truck, rail, or slurry pipeline. This draft EIS evaluates the...

  5. EIS-0445: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Mason County, West Virginia near the town of New Haven. PDF icon EIS-0445-DEIS-Summary-20100.pdf PDF icon Mountaineer Commercial Scale Carbon Capture and Storage Project, Draft...

  6. EIS-0005: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The...

  7. EIS-0435: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative...

  8. EIS-0263: Interior Columbia Basin Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The ICBEMP strategy will include direction which will protect and enhance aquatic ecosystems for anadromous fish and inland native trout and terrestrial ecosystems. It will also address the social and economic interactions with these biological variables. (Merged with EIS-262 to become Eastside Ecosystem Management, Washington and Oregon)

  9. EIS-0454: Notice of Adoption of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement, a 7,680-Acre Right-of-Way (ROW) on Public Lands to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, Nevada. PDF icon Notice of Adoption of the...

  10. DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)

    Office of Environmental Management (EM)

    COVER SHEET RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5

  11. EIS-0158-S2: Final Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Program Environmental Impact Report for the Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California

  12. EIS-0500: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental impacts of funding a proposal of the Shoshone-Bannock Tribes of the Fort Hall Reservation of Idaho to construct and operate a hatchery for springsummer Chinook...

  13. EIS-0404: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This EISEnvironmental Impact Report was prepared by the Department of the Interior (Bureau of Reclamation, Mid-Pacific Region) and the Contra Costa Water District to evaluate...

  14. EIS-0425: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The...

  15. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  16. Environmental Impact Statement Explained

    Broader source: Energy.gov [DOE]

    The National Environmental Policy Act (NEPA) requires Federal agencies to prepare an Environmental Impact Statement (EIS) for all major Federal actions that may significantly affect the quality of...

  17. EIS-0495: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement More Documents & Publications EIS-0495: Draft Environmental Impact Statement EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project...

  18. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

  19. EIS-0523: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Non-Contiguous United States

  20. EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  1. EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  2. EIS-0288; Final Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor

    National Nuclear Security Administration (NNSA)

    iii COVER SHEET Responsible Agency: United States Department of Energy Cooperating Agency: Tennessee Valley Authority Title: Final Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor Contact: For additional information on this Final Environmental Impact Statement, write or call: Jay Rose Office of Defense Programs U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attention: CLWR EIS Telephone: (202) 586-5484 For copies of the

  3. DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)

    Energy Savers [EERE]

    Bonneville Power Administration 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the

  4. EIS-0158-S2: Supplemental Environmental Impact Statement Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement, the supplement to DOE/EIS-0158, to analyze the environmental and socioeconomic impacts of the sale of Naval Petroleum Reserve No. 1 in Kern County, California to Occidental Petroleum Corporation.

  5. EIS-0503: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the...

  6. EIS-0461: Notice of Cancellation of the Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Hyde County Wind energy Center Project EIS-0461-NotofCancel-2011.pdf More Documents & Publications EIS-0462: Notice of Cancellation of an Environmental Impact Statement EIS-0469:...

  7. Environmental Impact Statement Summary | Department of Energy

    Office of Environmental Management (EM)

    Summary Environmental Impact Statement Summary This DOE guidance is intended to help EIS preparers draft the EIS summary. PDF icon Environmental Impact Statement Summary More Documents & Publications "Frequently Asked Questions" on the Department of Energy's NEPA Regulations EIS-0456: Final Environmental Impact Statement EIS-0245-SA-03: Supplement Analysis

  8. EIS-0385: Record of Decision and Floodplain Statement of Findings...

    Broader source: Energy.gov (indexed) [DOE]

    DOE has prepared an environmental impact statement (EIS) (DOEEIS-0385), DOE has decided to develop a new 160 MMB SPR storage facility at Richton (Mississippi), expand the storage...

  9. EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov (indexed) [DOE]

    (Second Scoping) | Department of Energy BLMNOI2-2010.pdf More Documents & Publications EIA-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement

  10. EIS-0283-S1: Supplement to the Surplus Plutonium Disposition Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Supplement evaluates the potential environmental impacts of using MOX fuel in these six specific reactors named in the DCS proposal as well as other program changes made since the SPD Draft EIS...

  11. DOE/EIS-0288-S1 Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor, Summary

    National Nuclear Security Administration (NNSA)

    Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor Summary U.S. Department of Energy National Nuclear Security Administration DOE/EIS-0288-S1 February 2016 ACRONYMS AND ABBREVIATIONS CFR Code of Federal Regulations CLWR commercial light water reactor CRD Comment Response Document DOE U.S. Department of Energy EIS environmental impact statement EPA U.S. Environmental Protection Agency FR Federal Register NEPA National Environmental

  12. DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal...

    Office of Environmental Management (EM)

    Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOEEIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF...

  13. EIS-0408: EPA Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  14. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  15. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    here to return to the Main Menu Volume I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Summary COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information concerning the Final

  16. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Click here to return to the Main Menu Comments and Responses COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information

  17. EIS-0387: Y-12 National Security Complex Site-Wide Environmental Impact Statement, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This Final Y-12 Site-wide EIS analyzed the potential environmental impacts of the reasonable alternatives for ongoing and foreseeable future operations and activities at Y-12, including alternatives for changes to site infrastructure and levels of operation (using production capacity as the key metric for comparison).

  18. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Draft Environmental Impact Statement More Documents & Publications EIS-0433-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

  19. EIS-0481: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Final Environmental Impact Statement More Documents & Publications EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement...

  20. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  1. EIS-0388: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final...

  2. EIS-0401: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0401: Notice of Intent to Prepare an Environmental Impact Statement Construction and Operation of the Proposed NextGen Energy Facility The...

  3. EIS-0439: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0439: Notice of Intent to Prepare an Environmental Impact Statement Proposed Construction and Operation of the Rice Solar Energy Project,...

  4. EIS-0430: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0430: Notice of Intent to Prepare an Environmental Impact Statement Federal Loan Guarantee to Support Construction and Start-up of the...

  5. EIS-0421: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0421: Notice of Intent to Prepare an Environmental Impact Statement Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County,...

  6. EIS-0355: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement EIS-0355: Notice of Intent to Prepare an Environmental Impact Statement...

  7. EIS-0409: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Prepare an Environmental Impact Statement and Notice of Proposed Floodplain and Wetlands Involvement EIS-0409: Notice of Intent to Prepare an Environmental Impact Statement...

  8. EIS-0389: Notice of Intent To Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement and Conduct Scoping Meetings; Notice of Floodplain and Wetlands Involvement EIS-0389: Notice of Intent To Prepare an Environmental Impact Statement...

  9. EIS-0200: Waste Management Programmatic Environmental Impact...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste EIS-0200: Waste Management ...

  10. EIS-0236-S4: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) analyzes the potential environmental impacts of reasonable alternatives to continue transformation of the nuclear weapons complex to be smaller, and more responsive, efficient, and secure in order to meet national security requirements.

  11. EIS-0488: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS ...

  12. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that ...

  13. EIS-0486: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of a final EIS that ...

  14. EIS-0486: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: DOE Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a draft EIS that ...

  15. EIS-0447: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  16. EIS-0460: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  17. EIS-0226: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    April 2010) More Documents & Publications EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: Notice of Changes to Public Hearings...

  18. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  19. EIS-0484: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana...

  20. EIS-0312: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0312: Notice of Intent to Prepare an Environmental Impact Statement Fish and Wildlife Implementation Plan for the Bonneville Power Administration Throughout the...

  1. EIS-0414: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0414: Notice of Intent to Prepare an Environmental Impact Statement Energia Sierra Juarez Transmission Project Proposed construction of a new electric...

  2. EIS-0444: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0444: Notice of Intent to Prepare an Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Intent to Prepare an Environmental...

  3. EIS-0383: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0383: Notice of Intent to Prepare an Environmental Impact Statement Orlando Gasification Project, Orlando, FL The U.S. Department of Energy (DOE) announces its...

  4. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within...

  5. Environmental Impact Statement | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statements DOE/EIS-0473 - W.A. Parish Post-Combustion CO2 Capture and Sequestration Project Notice of Intent (November 2011) Draft Environmental Impact Statement (September 2012) Final Environmental Impact Statement (February 2013) Record of Decision (May 2013) Mitigation Action Plan (June 2013) DOE/EIS-0464 - Lake Charles CCS Project Notice of Intent (April 2011) Draft Environmental Impact Statement (April 2013) Final Environmental Impact Statement (November 2013) Record of Decision

  6. EIS-0287: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement, EIS-0287 (September 2002)

    Broader source: Energy.gov [DOE]

    This EIS analyzes the potential environmental consequences of alternatives for managing high-level waste (HLW) calcine, mixed transuranic waste/sodium bearing waste (SBW) and newly generated liquid...

  7. EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  8. EIS-0407: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Kansas EIS-0407-NOI-20080.pdf More Documents & Publications EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement EIS-0407: DOE Notice of...

  9. EIS-0458: EPA Notice of Availability of Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  10. EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    this Supplement to the Draft EIS to correct information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, to provide information on the...

  11. EIS-0458: EPA Notice of Availability of Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  12. EIS-0463: EPA Notice of Availability of Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Draft Environmental Impact Statement (Draft EIS) for the Northern Pass Transmission Line Project. The Draft EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Northern Pass

  13. DOE/EIS-0373D; Draft Environmental Impact Statement for the Proposed...

    Broader source: Energy.gov (indexed) [DOE]

    Chapters 1 through 10 Appendices A through H Cover Sheet ......G-1 Appendix H Contractor Disclosure Statement......

  14. Submitting Environmental Impact Statements | Department of Energy

    Energy Savers [EERE]

    Submitting Environmental Impact Statements Submitting Environmental Impact Statements Guidance from the Environmental Protection Agency's Office of Federal Activities on the filing of EISs. PDF icon Submitting Environmental Impact Statements More Documents & Publications EIS-0470: EPA Amended Notice of Adoption EPA -- Amended Environmental Impact Statement Filing System Guidance (2012) Frequently Asked Questions on Filing EISs with EPA's Office of Federal Activities

  15. EIS-0236-S1: National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial...

  16. Solar Progammatic Environmental Impact Statement, Volume 1 |...

    Open Energy Info (EERE)

    Progammatic Environmental Impact Statement, Volume 1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Progammatic Environmental...

  17. West Wide Programmatic Environmental Impact Statement Record...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: West Wide Programmatic Environmental Impact Statement Record of Decision (BLM)Legal...

  18. EIS-0463: Reopening of Scoping Period for the Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. For more information see the project page at:

  19. EIS-0487: EPA Notice of Availability of Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the Draft Environmental Impact Statement for the Freeport LNG Liquefaction Project, Brazoria County, Texas. PDF icon EIS-0487-DEIS-EPA-NOA-2014.pdf More Documents & Publications EIS-0472: EPA Notice of Availability of Final

  20. EIS-0447: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 EIS-0447: Amended Notice of Intent to Prepare an Environmental Impact...

  1. EIS-0390: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent to Prepare an Environmental Impact Statement; Floodplain and Wetlands Involvement; and Public Scoping Meetings EIS-0390: Notice of Intent to Prepare an Environmental Impact...

  2. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  3. EIS-0250-S2 and EIS-0369: Draft Supplemental Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0250-S2 and EIS-0369: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca...

  4. EIS-0205: Joint NEPA/SEPA Final Environmental Impact Statement Washington Windplant No. 1, Goldendale, Washington

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energys Bonneville Power Administration prepared this statement in order to fulfill its National Environmental Policy Act obligations ahead of signing an agreement with the utilities that would purchase the Windplants power from KENETECH. KENETECH Windpower, Inc., proposes to construct and operate Washington Windplant No. 1 in the Columbia Hills area, southeast of Goldendale, in Klickitat County, Washington.

  5. EIS-0423: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Final Environmental Impact Statement EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Download Document PDF icon EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final

  6. EIS-0370: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 370: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0370: EPA Notice of Availability of the Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: EPA Notice of Availability of the Final Environmental Impact Statement More Documents & Publications EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of

  7. EIS-0375: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 375: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document PDF icon EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement More Documents & Publications EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0487: Notices of

  8. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents & Publications EIS-0407: Record of Decision EIS-0407: Final Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement

  9. EIS-0424: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 24: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0424: EPA Notice of Availability of the Draft Environmental Impact Statement Klickitat Hatchery Complex Program, Klickitat and Yakima Counties, WA Download Document PDF icon EIS-0424: EPA Notice of Availability of the Draft Environmental Impact Statement More Documents & Publications EIS-0462: Notice of Cancellation of an Environmental Impact Statement EIS-0365: EPA Notice of

  10. EIS-0375: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document PDF icon EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement More Documents & Publications EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: Final Environmental

  11. EIS-0474: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EIS-0474: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0474: EPA Notice of Availability of Draft Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and New Mexico), draft EIS that was issued by the Bureau of Land Management and Western Area Power Administration to evaluate the potential environmental impacts of the

  12. EIS-0495: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 95: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0495: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon EPA announced the availability of Bonneville Power Administration's Draft EIS that analyzes the potential environmental impacts of funding a proposal by the Confederated Tribes of the Umatilla Indian Reservation to construct and

  13. EIS-0470: EPA Notice of Adoption of the Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: EPA Notice of Adoption of the Final Environmental Impact Statement EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement Cape Wind Energy Project in ...

  14. EIS-0499: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final Environmental Impact Statement for the Great Northern Transmission Line Project. The Final EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct,

  15. EIS-0300: Withdrawal of Notice of Intent to Prepare an Environmental Impact

    Broader source: Energy.gov (indexed) [DOE]

    Statement | Department of Energy Proposed Minnesota Agri-Power Plant and Associated Facilities PDF icon EIS-0300-WdNOI-1999.pdf More Documents & Publications EIS-0238: Withdrawal of Notice of Intent to Prepare an Environmental Impact Statement EIS-0300: Notice of Intent to Prepare an Environmental Impact Statement EIS-0238: Record of Decision

  16. EIS-0375: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    than-Class C Low-Level Radioactive Waste The Department of Energy (DOE) announces its intent to prepare an environmental impact statement (EIS) under the National Environmental...

  17. EIS-0503: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113 - Jun. 12, 2015 EIS-0503: EPA Notice of Availability of Draft Environmental Impact Statement...

  18. EIS-0503: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113 - Jun. 12, 2015 EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement...

  19. EIS-0492: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EIS-0492: EPA Notice of Availability of Draft Environmental Impact Statement Oregon LNG ... the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  20. EIS-0367: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission Policy-Level Environmental Impact Statement, DOEEIS-0367 (December 2003 - 68 FR 71101) More Documents & Publications EIS-0374: Notice of Intent to Prepare an...