National Library of Energy BETA

Sample records for impact assessment pia

  1. PRIVACY IMPACT ASSESSMENT: Occupational Medicine Assistant PIA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine - Assistant PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Deparlment of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1-

  2. Privacy Impact Assessment (PIA) Template and Guidance | Department of

    Energy Savers [EERE]

    Energy Privacy Impact Assessment (PIA) Template and Guidance Privacy Impact Assessment (PIA) Template and Guidance File Privacy_Impact_Assessment_Template_May_2009_w_Guidance.docx More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  3. PRIVACY IMPACT ASSESSMENT: INL INGSM2009 PIA Template Version

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * PRIVACY IMPACT ASSESSMENT: INL INGSM2009 PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not

  4. PRIVACY IMPACT ASSESSMENT: CF GovTrip PIA Template Version

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CF - GovTrip PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element &Site July 28, 2009 General Services Administration NORTHROP

  5. PRIVACY IMPACT ASSESSMENT: INL Education Programs PIA Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education Programs PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE I -

  6. PRIVACY IMPACT ASSESSMENT: INL PERSONNEL SECURITY SECIMS PIA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PERSONNEL SECURITY - SECIMS PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified.

  7. PRIVACY IMPACT ASSESSMENT: IDAHO NATIONAL LABORATORY-TRAIN PIA

    Energy Savers [EERE]

    IDAHO NATIONAL LABORATORY-TRAIN PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-wrltten submissions will be accepted. This template may not be modified.

  8. Office of Acquisition and Financial Assessment PIA, Golden Field...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment ...

  9. Office of Acquisition and Financial Assessment PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office PDF icon Office of Acquisition and Financial Assessment PIA, Golden Field Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory E-IDR

  10. PRIVACYI1vIPACT ASSESSMENT: ORG NAME-SYSTEM NAME PIA Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PRIVACYI1vIPACT ASSESSMENT: ORG NAME-SYSTEM NAME PIA Template Version 4- June, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional gUidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may

  11. PRIVACY IMPACT ASSESSMENT: INL Communications

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications and Public Affairs Tour Tracker PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for reqUirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may

  12. Office of Acquisition and Financial Assessment PIA, Golden Field...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA,...

  13. PRIVACY IMPACT ASSESSMENT: Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY

  14. PRIVACY IMPACT ASSESSMENT: Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE

  15. PRIVACY IMPACT ASSESSMENT: Visitor Dosimeter Badge Tracking

    Energy Savers [EERE]

    PRIVACY IMPACT ASSESSMENT: Visitor Dosimeter Badge Tracking PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetexUneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This

  16. PRIVACY IMPACT ASSESSMENT: Human Resources Personal Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Human Resources - Personal Information Change Request PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This

  17. PRIVACY IMPACT ASSESSMENT: INL E-IDR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INL E-IDR (Invention Disclosure Record) PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be

  18. PRIVACY IMPACT ASSESSMENT: INL Energy Employees' Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INL Energy Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance Is provided In the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written

  19. PRIVACY IMPACT ASSESSMENT: INL Manchester Software

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manchester Software 1099 Reporting PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program. Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be

  20. PRIVACY IMPACT ASSESSMENT: Integrated Safety Management Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template

  1. PRIVACY IMPACT ASSESSMENT: OCCUPATIONAL MEDICINE- INL OCCUPATIONAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OCCUPATIONAL MEDICINE- INL OCCUPATIONAL MEDICAL SUVEILLANCE SYSTEM (OMSS) PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be

  2. PRIVACY IMPACT ASSESSMENT: OCIO HSPD-12 Physical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OCIO - HSPD-12 Physical and Logical System PIA Template Version 4- June, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not

  3. PRIVACY IMPACT ASSESSMENT: Occupational Safety Health Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Occupational Safety & Health - Occupational Injury & Illness System PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1 J Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be

  4. Impact Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Assessments Impact Assessments american-flag-802087_960_720.jpg PIA Template with Guidance (MS Word) DOE F 206.1 PIA Template (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf)

  5. RIVACY IMPACT ASSESSMENT: SPRO Business Operations General Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RIVACY IMPACT ASSESSMENT: SPRO - Business Operations General Support System PIA Template Version 3 - May, 2009 iiiiiiiiiiiiiii Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf MODULE I - PRIVACY NEEDS ASSESSMENT Date

  6. Privacy Impact Assessment Template and Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Impact Assessment Template and Guidance Privacy Impact Assessment Template and Guidance Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting an assessment. More Documents & Publications PIA - INL Education Programs Business Enclave Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory TRAIN-PIA.pdf

  7. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    '" " * .1 * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: FREEDOM OF INFORMAnON ACT/ PRIVACY ACT PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf

  8. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ,. - -i * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: FERNALD HISTORICAL RECORDS SYSTEM PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete

  9. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM ROCKY FLATS ENVIRONMENTAL RECORDS DATABASE PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete

  10. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -. ., ,-- -.' * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: ELECTRONIC RECORDS KEEPING SYSTEM PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1. Department of Energy Privacy Program, Appendix A. Privacy Impact Assessments. for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete

  11. PIA- Management and Administration (MA)

    Broader source: Energy.gov [DOE]

    The E-Government Act of 2002 requires Federal agencies to perform Privacy Impact Assessments (PIAs), an analysis of how information is handled, in order: (i) to ensure handling conforms to...

  12. PRIVACY IMPACT ASSESSMENT: SPRO Physical Security Major Application

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SPRO - Physical Security Major Application PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Deparlment of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional gUidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetexUneword/206/o2061.pdf MODULE I - PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site JUly 21, 2009 Office of

  13. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: ENERGY EMPLOYEES OCCUPATIONAL ILLNESS COMPENSATION PROGRAM ACT PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance Is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete

  14. PRIVACY IMPACT ASSESSMENT: Shaw Areva MOX Services, LLC MOX

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . ,-) ')7 73?¥i5": )~"'f"YC-:;'~dt?f(~"'f9'FrrZ , . PRIVACY IMPACT ASSESSMENT: Shaw Areva MOX Services, LLC MOX Services Unclassified Information System Template - January 30, 2009, Version 2 Department of Energy Privacy Impact Assessment (pIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA:

  15. Manager's Signature Log Privacy Impact Assessment, Office of Science

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chicago Office | Department of Energy Manager's Signature Log Privacy Impact Assessment, Office of Science Chicago Office Manager's Signature Log Privacy Impact Assessment, Office of Science Chicago Office Manager's Signature Log Privacy Impact Assessment, Office of Science Chicago Office PDF icon Manager's Signature Log Privacy Impact Assessment, Office of Science Chicago Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National

  16. PIA - FITPLUS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FITPLUS PIA - FITPLUS PIA - FITPLUS PDF icon PIA - FITPLUS More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave

  17. PIA - FOIAXpress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FOIAXpress PIA - FOIAXpress PIA - FOIAXpress PDF icon PIA - FOIAXpress More Documents & Publications PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave TRAIN-PIA.pdf

  18. PIA - Richland Occupational Medicine Contract | Department of...

    Energy Savers [EERE]

    PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational...

  19. PIA - NGP Fellow Application System PIA, Pacific Northwest National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA NGP Fellow Application System PIA, Pacific Northwest National Laboratory PDF icon PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory More Documents & Publications PIA - WEB iPASS System DOE PIA Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory

  20. PIA - NGP Fellow Application System PIA, Pacific Northwest National...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications PIA - WEB iPASS System DOE PIA Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Integrated Safety Management Workshop ...

  1. PIA - Tour Tracker | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tour Tracker PIA - Tour Tracker PIA - Tour Tracker PDF icon PIA - Tour Tracker More Documents & Publications PIA - INL Education Programs Business Enclave Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory TRAIN-PIA.pdf

  2. PIA - Travel Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Travel Manager PIA - Travel Manager PIA - Travel Manager PDF icon PIA - Travel Manager More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  3. Hanford Identification (HID) PIA, Richland Operations Office...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  4. Occupational Medicine - Assistant PIA, Idaho National Laboratory...

    Energy Savers [EERE]

    Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho...

  5. PIA - WEB iPASS System DOE PIA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    iPASS System DOE PIA PIA - WEB iPASS System DOE PIA PIA - WEB iPASS System DOE PIA PDF icon PIA - WEB iPASS System DOE PIA More Documents & Publications PIA - INL Education Programs Business Enclave Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  6. TRAIN-PIA.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRAIN-PIA.pdf TRAIN-PIA.pdf PDF icon TRAIN-PIA.pdf More Documents & Publications PIA - INL Education Programs Business Enclave PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM...

  7. Privacy Impact Assessment

    Broader source: Energy.gov (indexed) [DOE]

    website. For this reason, PIAs affecting Members of the Public should be written in plain language and at a high level so they are easily understandable and do not disclose...

  8. Occupational Medicine - Assistant PIA, Idaho National Laboratory |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory PDF icon Occupational Medicine - Assistant PIA, Idaho National Laboratory More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - INL Education

  9. Integrated Safety Management Workshop Registration, PIA, Idaho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho National Laboratory More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA - INL Education Programs Business ...

  10. Integrated Safety Management Workshop Registration, PIA, Idaho...

    Energy Savers [EERE]

    Idaho National Laboratory More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA - INL Education Programs Business...

  11. PIA - Savannah River Nuclear Solutions Electronic Safeguards...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical and Logical Access System PIA - Savannah ...

  12. PIA - WEB iPASS System DOE PIA | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    PIA - WEB iPASS System DOE PIA PDF icon PIA - WEB iPASS System DOE PIA More Documents & Publications PIA - INL Education Programs Business Enclave Integrated Safety Management ...

  13. PIA - DOE PIV System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PIV System PIA - DOE PIV System PIA - DOE PIV System PDF icon PIA - DOE PIV System More Documents & Publications PIA - HSPD-12 Physical and Logical Access System Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - WEB Unclassified Business Operations General Support System

  14. PIA - Flexible Spending Accounts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flexible Spending Accounts PIA - Flexible Spending Accounts PIA - Flexible Spending Accounts PDF icon PIA - Flexible Spending Accounts More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - FOIAXpress

  15. PIA - Plateau Training System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plateau Training System PIA - Plateau Training System PIA - Plateau Training System PDF icon PIA - Plateau Training System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - GovTrip (DOE data)

  16. PIA - Radiological Work Permit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Work Permit PIA - Radiological Work Permit PIA - Radiological Work Permit PDF icon PIA - Radiological Work Permit More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System

  17. PIA - Sunflower (BPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sunflower (BPA) PIA - Sunflower (BPA) PIA - Sunflower (BPA) PDF icon PIA - Sunflower (BPA) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  18. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  19. Commercialization and Project Management PIA, Golden Field Office...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  20. Badge Request System PIA, Richland Operations Office | Department...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  1. EDOCS PIA, Office of the Executive Secretariate | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medicine - Assistant PIA, Idaho ...

  2. PIA - WEB Physical Security Major Application | Department of...

    Energy Savers [EERE]

    PIA - WEB Physical Security Major Application PIA - WEB Physical Security Major Application PIA - WEB Physical Security Major Application PDF icon PIA - WEB Physical Security Major...

  3. PIA - Environmental Management Consolidated Business Center (EMCBC) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PDF icon PIA - Environmental Management Consolidated Business Center (EMCBC) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 LM Records Handling System (LMRHS01) - Rocky

  4. PIA - FBI Billing System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FBI Billing System PIA - FBI Billing System FBI Billing System PDF icon PIA - FBI Billing System More Documents & Publications PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Occupational Medicine - Assistant PIA, Idaho National

  5. PIA - HS Web Services (HSWS) | Department of Energy

    Energy Savers [EERE]

    PIA - HS Web Services (HSWS) PIA - HS Web Services (HSWS) PIA - HS Web Services (HSWS) PDF icon PIA - HS Web Services (HSWS) More Documents & Publications PIA - INL PeopleSoft -...

  6. PIA - Richland Occupational Medicine Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational Medicine Contract More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  7. PIA - Human Resources - Personal Information Change Request ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE Integrated Safety Management Workshop ...

  8. PIA - FBI Billing System | Department of Energy

    Energy Savers [EERE]

    and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  9. PIA - Environmental Molecular Sciences Laboratory (EMSL) User...

    Broader source: Energy.gov (indexed) [DOE]

    Molecular Sciences Laboratory (EMSL) User System (ESU) PDF icon PIA - Environmental Molecular Sciences Laboratory (EMSL) User System (ESU) More Documents & Publications PIA - WEB ...

  10. PIA - Environmental Management Consolidated Business Center ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 LM Records Handling ...

  11. PIA - I-Manage STARS | Department of Energy

    Energy Savers [EERE]

    PIA - I-Manage STARS PIA - I-Manage STARS PIA - I-Manage STARS PDF icon PIA - I-Manage STARS More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave

  12. Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC PDF icon Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC

  13. Badge Request System PIA, Richland Operations Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office PDF icon Badge Request System PIA, Richland Operations Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory

  14. Occupational Health Manager PIA, Carlsbad Field Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Health Manager PIA, Carlsbad Field Office Occupational Health Manager PIA, Carlsbad Field Office Occupational Health Manager PIA, Carlsbad Field Office PDF icon Occupational Health Manager PIA, Carlsbad Field Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory

  15. Oracle Financials PIA, Bechtel Jacobs Company, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oracle Financials PIA, Bechtel Jacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC PDF icon Oracle Financials PIA, Bechtel Jacobs Company, LLC More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC

  16. PIA - Weapons Data Control Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Weapons Data Control Systems PIA - Weapons Data Control Systems PIA - Weapons Data Control Systems PIA PDF icon PIA - Weapons Data Control Systems More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  17. Pension Estimate System PIA, Bechtel Jacobs Company, LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Pension Estimate System PIA, Bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC PDF icon Pension Estimate System PIA, Bechtel Jacobs Company, LLC More Documents & Publications Electronic Document Management System PIA, BechtelJacobs Company, LLC Dosimetry Records System PIA, bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs

  18. Hanford Identification (HID) PIA, Richland Operations Office | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office PDF icon Hanford Identification (HID) PIA, Richland Operations Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National

  19. Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC PDF icon Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC

  20. Integrated Safety Management Workshop Registration, PIA, Idaho National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PDF icon Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA -

  1. Land Record System PIA, Bonneville Power Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration PDF icon Land Record System PIA, Bonneville Power Administration More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  2. Legacy Claims, PIA, Bechtel Jacobs Company, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legacy Claims, PIA, Bechtel Jacobs Company, LLC Legacy Claims, PIA, Bechtel Jacobs Company, LLC Legacy Claims, PIA, Bechtel Jacobs Company, LLC PDF icon Legacy Claims, PIA, Bechtel Jacobs Company, LLC More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC

  3. Medgate, PIA, Bechtel Jacobs Company, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medgate, PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC PDF icon Medgate, PIA, Bechtel Jacobs Company, LLC More Documents & Publications Electronic Document Management System PIA, BechtelJacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC Annual Benefits Statement, PIA, Bechtel Jacobs Company, LLC

  4. Freedom of Information and Privacy Act Database PIA, Idaho Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office More Documents & Publications PIA - Security Clearance Work Tracking and Budget System TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory

  5. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - ...

  6. E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho ...

  7. Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC Intergrated Drug Testing System, PIA, Bechtel ...

  8. Employee Concerns Tracking System, PIA, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC Employee Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC Employee Concerns Tracking System, PIA, Bechtel ...

  9. Electronic Document Management System PIA, BechtelJacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs ...

  10. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BUSINESS ENCLAVE PDF icon PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ... 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  11. PIA - 10th International Nuclear Graphite Specialists Meeting...

    Energy Savers [EERE]

    PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - 10th...

  12. PIA - Fossil Energy Web System (FEWEB) | Department of Energy

    Energy Savers [EERE]

    Fossil Energy Web System (FEWEB) PIA - Fossil Energy Web System (FEWEB) PIA - Fossil Energy Web System (FEWEB) PDF icon PIA - Fossil Energy Web System (FEWEB) More Documents &...

  13. Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce Carlsbad Industrial Safety and Health PIA, Carlsbad ...

  14. Freedom of Information and Privacy Act Database PIA, Idaho Operations...

    Energy Savers [EERE]

    Office More Documents & Publications PIA - Security Clearance Work Tracking and Budget System TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  15. PIA - Security Clearance Work Tracking and Budget System | Department...

    Energy Savers [EERE]

    Documents & Publications Freedom of Information and Privacy Act Database PIA, Idaho Operations Office Occupational Medicine - Assistant PIA, Idaho National Laboratory TRAIN-PIA.pdf...

  16. MOX Services Unclassified Information System PIA, National Nuclear...

    Energy Savers [EERE]

    Services Administration More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  17. PIA - ETTP Badge Imaging System (EBIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ETTP Badge Imaging System (EBIS) PIA - ETTP Badge Imaging System (EBIS) PIA - ETTP Badge Imaging System (EBIS) PDF icon PIA - ETTP Badge Imaging System (EBIS)

  18. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 ...

  19. Commercialization and Project Management PIA, Golden Field Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 ...

  20. Occupational Medical Surveillance System (OMSS) PIA, Idaho National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (OMSS) PIA, Idaho National Laboratory More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System ...

  1. Electronic DOE Information Security System (eDISS) PIA, Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness ...

  2. MOX Services Unclassified Information System PIA, National Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services ...

  3. eGIS Portal PIA, Bonneville Power Administration | Department...

    Energy Savers [EERE]

    Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  4. Electronic DOE Information Security System (eDISS) PIA, Office...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  5. Land Record System PIA, Bonneville Power Administration | Department...

    Energy Savers [EERE]

    Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  6. Corporate Human Resources Information Services (CHIRS) PIA, Office...

    Energy Savers [EERE]

    Nuclear Services Administration Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  7. Occupational Medical Surveillance System (OMSS) PIA, Idaho National...

    Energy Savers [EERE]

    (OMSS) PIA, Idaho National Laboratory More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  8. Occupational Health Manager PIA, Carlsbad Field Office | Department...

    Energy Savers [EERE]

    Health Manager PIA, Carlsbad Field Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop...

  9. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...

    Energy Savers [EERE]

    (EJTA) PIA, Richland Operations Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  10. Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC ...

    Energy Savers [EERE]

    More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  11. Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  12. PIA - Savannah River Site Management and Operating Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA,...

  13. PIA - HS Correspondence Tracking System (HSCT) | Department of Energy

    Energy Savers [EERE]

    Correspondence Tracking System (HSCT) PIA - HS Correspondence Tracking System (HSCT) PIA - HS Correspondence Tracking System (HSCT) PDF icon PIA - HS Correspondence Tracking System (HSCT) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  14. Commercialization and Project Management PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office PDF icon Commercialization and Project Management PIA, Golden Field Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software

  15. PIA - AMWTP Information Systems Enclave | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AMWTP Information Systems Enclave PIA - AMWTP Information Systems Enclave PIA - AMWTP Information Systems Enclave PDF icon PIA - AMWTP Information Systems Enclave More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  16. PIA - Corporate Planning System (CPS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporate Planning System (CPS) PIA - Corporate Planning System (CPS) PIA - Corporate Planning System (CPS) PDF icon PIA - Corporate Planning System (CPS) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  17. PIA - EERE Infrastructure-EERE Reviewer Management System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PDF icon PIA - EERE Infrastructure-EERE Reviewer Management System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System PIA - Bonneville Power Adminstration Ethics Helpline

  18. PIA - EMRC Livelink Records Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMRC Livelink Records Management System PIA - EMRC Livelink Records Management System PIA - EMRC Livelink Records Management System PDF icon PIA - EMRC Livelink Records Management System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  19. PIA - Energy Inspector General Project Tracking System (EIGPT) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Inspector General Project Tracking System (EIGPT) PIA - Energy Inspector General Project Tracking System (EIGPT) PIA - Energy Inspector General Project Tracking System (EIGPT) PDF icon PIA - Energy Inspector General Project Tracking System (EIGPT) More Documents & Publications PIA - FOIAXpress PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System

  20. PIA - Fossil Energy Web System (FEWEB) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fossil Energy Web System (FEWEB) PIA - Fossil Energy Web System (FEWEB) PIA - Fossil Energy Web System (FEWEB) PDF icon PIA - Fossil Energy Web System (FEWEB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - WEB Physical Security Major Application PIA - WEB Unclassified Business Operations General Support

  1. PIA - GovTrip (DOE data) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GovTrip (DOE data) PIA - GovTrip (DOE data) PIA - GovTrip (DOE data) PDF icon PIA - GovTrip (DOE data) More Documents & Publications PIA - INL PeopleSoft - Human Resource System Manchester Software 1099 Reporting PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  2. PIA - HS Web Services (HSWS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HS Web Services (HSWS) PIA - HS Web Services (HSWS) PIA - HS Web Services (HSWS) PDF icon PIA - HS Web Services (HSWS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave

  3. PIA - HSS Electronic Visitor Management System (HSEVMS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy HSS Electronic Visitor Management System (HSEVMS) PIA - HSS Electronic Visitor Management System (HSEVMS) PIA - HSS Electronic Visitor Management System (HSEVMS) PDF icon PIA - HSS Electronic Visitor Management System (HSEVMS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  4. PIA - Hiring Management Enterprise Solutions (HMES) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hiring Management Enterprise Solutions (HMES) PIA - Hiring Management Enterprise Solutions (HMES) PIA - Hiring Management Enterprise Solutions (HMES) PDF icon PIA - Hiring Management Enterprise Solutions (HMES) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - WEB Physical Security Major Application PIA - 10th International Nuclear Graphite Specialists Meeting registration web site

  5. PIA - Historical Data for Legal Organizations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Historical Data for Legal Organizations PIA - Historical Data for Legal Organizations PIA - Historical Data for Legal Organizations PDF icon PIA - Historical Data for Legal Organizations More Documents & Publications PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL PeopleSoft - Human Resource System PIA - FOIAXpress

  6. PIA - Human Resources Information System (HRIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information System (HRIS) PIA - Human Resources Information System (HRIS) PIA - Human Resources Information System (HRIS) PDF icon PIA - Human Resources Information System (HRIS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  7. PIA - Human Resources Management Information System (HRMIS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PDF icon PIA - Human Resources Management Information System (HRMIS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  8. PIA - Human Resources Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System PIA - Human Resources Management System PIA - Human Resources Management System PDF icon PIA - Human Resources Management System More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  9. PIA - Human Resources System/Payroll System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System/Payroll System PIA - Human Resources System/Payroll System PIA - Human Resources System/Payroll System PDF icon PIA - Human Resources System/Payroll System More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  10. PIA - IComplaints - Golden Field Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IComplaints - Golden Field Office PIA - IComplaints - Golden Field Office PIA - IComplaints - Golden Field Office PDF icon PIA - IComplaints - Golden Field Office More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - FOIAXpress

  11. PIA - INL Education Programs Business Enclave | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education Programs Business Enclave PIA - INL Education Programs Business Enclave PIA - INL Education Programs Business Enclave PDF icon PIA - INL Education Programs Business Enclave More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Tour Tracker

  12. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PDF icon PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE More Documents & Publications PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  13. PIA - Industrial Hygiene Analytical System (IHAS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Hygiene Analytical System (IHAS) PIA - Industrial Hygiene Analytical System (IHAS) PIA - Industrial Hygiene Analytical System (IHAS) PDF icon PIA - Industrial Hygiene Analytical System (IHAS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  14. PIA - Industry Interactive Procurement System (IIPS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industry Interactive Procurement System (IIPS) PIA - Industry Interactive Procurement System (IIPS) PIA - Industry Interactive Procurement System (IIPS) PDF icon PIA - Industry Interactive Procurement System (IIPS) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  15. PIA - Land Record System (SWPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Land Record System (SWPA) PIA - Land Record System (SWPA) PIA - Land Record System (SWPA) PDF icon PIA - Land Record System (SWPA) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave

  16. PIA - Northeast Home Heating Oil Reserve System (Heating Oil) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Northeast Home Heating Oil Reserve System (Heating Oil) PIA - Northeast Home Heating Oil Reserve System (Heating Oil) PIA - Northeast Home Heating Oil Reserve System (Heating Oil) PDF icon PIA - Northeast Home Heating Oil Reserve System (Heating Oil) More Documents & Publications PIA - WEB Physical Security Major Application PIA - GovTrip (DOE data) PIA - WEB Unclassified Business Operations General Support

  17. PIA - Positive Pay and Check Reconciliation (POSPAY) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Positive Pay and Check Reconciliation (POSPAY) PIA - Positive Pay and Check Reconciliation (POSPAY) PIA - Positive Pay and Check Reconciliation (POSPAY) PDF icon PIA - Positive Pay and Check Reconciliation (POSPAY) More Documents & Publications PIA - HSPD-12 Physical and Logical Access System Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory

  18. PIA - Radioactive Airborne Contamination Survey | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radioactive Airborne Contamination Survey PIA - Radioactive Airborne Contamination Survey PIA - Radioactive Airborne Contamination Survey PDF icon PIA - Radioactive Airborne Contamination Survey More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  19. PIA - Richland Personal Security Clearance Record | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Personal Security Clearance Record PIA - Richland Personal Security Clearance Record PIA - Richland Personal Security Clearance Record PDF icon PIA - Richland Personal Security Clearance Record More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  20. PIA - Rocky Mountain OTC GSS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Mountain OTC GSS PIA - Rocky Mountain OTC GSS PIA - Rocky Mountain OTC GSS PDF icon PIA - Rocky Mountain OTC GSS More Documents & Publications PIA - WEB Unclassified Business Operations General Support System Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  1. PIA - Savannah River Operations Office File and Print Services | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy File and Print Services PIA - Savannah River Operations Office File and Print Services PIA - Savannah River Operations Office File and Print Services PDF icon PIA - Savannah River Operations Office File and Print Services More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - GovTrip (DOE data)

  2. PIA - Savannah River Remediation Accreditation Boundary (SRR AB) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PDF icon PIA - Savannah River Remediation Accreditation Boundary (SRR AB) More Documents & Publications PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS) PIA, Idaho

  3. PIA - Security Clearance Tracking System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tracking System PIA - Security Clearance Tracking System PIA - Security Clearance Tracking System PDF icon PIA - Security Clearance Tracking System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  4. PIA - Security Clearance Work Tracking and Budget System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Work Tracking and Budget System PIA - Security Clearance Work Tracking and Budget System PIA - Security Clearance Work Tracking and Budget System PDF icon PIA - Security Clearance Work Tracking and Budget System More Documents & Publications Freedom of Information and Privacy Act Database PIA, Idaho Operations Office PIA - INL Education Programs Business Enclave Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  5. PIA - WEB Physical Security Major Application | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Physical Security Major Application PIA - WEB Physical Security Major Application PIA - WEB Physical Security Major Application PDF icon PIA - WEB Physical Security Major Application More Documents & Publications PIA - WEB Unclassified Business Operations General Support System Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  6. PIA - WEB Unclassified Business Operations General Support System |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PDF icon PIA - WEB Unclassified Business Operations General Support System More Documents & Publications PIA - WEB Physical Security Major Application PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  7. Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA,...

    Energy Savers [EERE]

    PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory...

  8. PIA - Human Resources - Personal Information Change Request ...

    Energy Savers [EERE]

    Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - Human Resources - Personal Information Change Request - Idaho National...

  9. Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC PDF icon Cyborge Reporting Solution, PIA, Bechtel Jacobs Company LLC More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory

  10. Dosimetry Records System PIA, bechtel Jacobs Company, LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Dosimetry Records System PIA, bechtel Jacobs Company, LLC Dosimetry Records System PIA, bechtel Jacobs Company, LLC Dosimetry Records System PIA, bechtel Jacobs Company, LLC PDF icon Dosimetry Records System PIA, bechtel Jacobs Company, LLC More Documents & Publications Electronic Document Management System PIA, BechtelJacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC

  11. Electronic Document Management System PIA, BechtelJacobs Company, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC PDF icon Electronic Document Management System PIA, BechtelJacobs Company, LLC More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC

  12. Employee Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC Employee Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC Employee Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC PDF icon Employee Concerns Tracking System, PIA, Bechtel Jacobs Company, LLC More Documents & Publications Electronic Document Management System PIA, BechtelJacobs Company, LLC Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel

  13. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office PDF icon Employee Job Task Analysis (EJTA) PIA, Richland Operations Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - GovTrip (DOE data

  14. PIA - Access Security Plan, Bechtel Jacobs Company LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Access Security Plan, Bechtel Jacobs Company LLC PIA - Access Security Plan, Bechtel Jacobs Company LLC PIA - Access Security Plan, Bechtel Jacobs Company LLC PDF icon PIA - Access Security Plan, Bechtel Jacobs Company LLC More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - WEB iPASS System DOE PIA Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  15. PIA - Environmental Molecular Sciences Laboratory (EMSL) User System (ESU)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Molecular Sciences Laboratory (EMSL) User System (ESU) PIA - Environmental Molecular Sciences Laboratory (EMSL) User System (ESU) PIA - Environmental Molecular Sciences Laboratory (EMSL) User System (ESU) PDF icon PIA - Environmental Molecular Sciences Laboratory (EMSL) User System (ESU) More Documents & Publications PIA - WEB iPASS System DOE PIA Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National

  16. Freedom of Information and Privacy Act Database PIA, Idaho Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office | Department of Energy Information and Privacy Act Database PIA, Idaho Operations Office Freedom of Information and Privacy Act Database PIA, Idaho Operations Office Freedom of Information and Privacy Act Database PIA, Idaho Operations Office PDF icon Freedom of Information and Privacy Act Database PIA, Idaho Operations Office More Documents & Publications PIA - Security Clearance Work Tracking and Budget System TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National

  17. Hanford People Core (HCP) PIA, Richland Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office PDF icon Hanford People Core (HCP) PIA, Richland Operations Office More Documents & Publications E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  18. Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC PDF icon Intergrated Drug Testing System, PIA, Bechtel Jacobs C ompany, LLC More Documents & Publications Electronic Document Management System PIA, BechtelJacobs Company, LLC Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel

  19. Occupational Medical Surveillance System (OMSS) PIA, Idaho National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PDF icon Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System

  20. PIA - Bonneville Power Adminstration Ethics Helpline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline Hosted and operated by Global Compliance Charlotte, North Carolina PDF icon PIA - Bonneville Power Adminstration Ethics Helpline More Documents & Publications Manchester Software 1099 Reporting PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory LM Records Handling System-Fernald

  1. PIA - Foreign Access Central Tracking System (FACTS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PDF icon PIA - Foreign Access Central Tracking System (FACTS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System

  2. PIA - Foreign Travel Management System (FTMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PDF icon PIA - Foreign Travel Management System (FTMS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  3. PIA - Richland Occupational Injury and Illness | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Injury and Illness PIA - Richland Occupational Injury and Illness PIA - Richland Occupational Injury and Illness PDF icon PIA - Richland Occupational Injury and Illness More Documents & Publications Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  4. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PDF icon PIA - Savannah River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  5. MOX Services Unclassified Information System PIA, National Nuclear Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administration | Department of Energy MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services Administration MOX Services Unclassified Information System PIA, National Nuclear Services Administration PDF icon MOX Services Unclassified Information System PIA, National Nuclear Services Administration More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant

  6. Manchester Software 1099 Reporting PIA, Idaho National Laboratory |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Manchester Software 1099 Reporting PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory PDF icon Manchester Software 1099 Reporting PIA, Idaho National Laboratory More Documents & Publications PIA - INL PeopleSoft - Human Resource System Energy Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees'

  7. Environmental Impact Statements and Environmental Assessments...

    Energy Savers [EERE]

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the...

  8. PIA - DOE OCIO, Open Government Plan Comment Box | Department...

    Office of Environmental Management (EM)

    DOE OCIO, Open Government Plan Comment Box PIA - DOE OCIO, Open Government Plan Comment Box PIA - DOE OCIO, Open Government Plan Comment Box PDF icon PIA - DOE OCIO, Open...

  9. Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce PDF icon Carlsbad Industrial Safety and Health PIA, Carlsbad Field Offce More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury &

  10. E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory PDF icon E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory More Documents & Publications PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration,

  11. PIA - DOE Savannah River Operations Office PRISM System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PDF icon PIA - DOE Savannah River Operations Office PRISM System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  12. PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LLC | Department of Energy Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PDF icon PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Form EIA-475 A/G Residential Energy Consumption Survey PIA -

  13. PIA - Savannah River Operations Office Lotus Domino/Notes System |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lotus Domino/Notes System PIA - Savannah River Operations Office Lotus Domino/Notes System PIA - Savannah River Operations Office Lotus Domino/Notes System PDF icon PIA - Savannah River Operations Office Lotus Domino/Notes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM System PIA - GovTrip (DOE data) PIA - HSPD-12 Physical and Logical Access System

  14. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PDF icon PIA - Savannah River Site Management and Operating Contractor (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  15. Health impact assessment in Korea

    SciTech Connect (OSTI)

    Kang, Eunjeong; Lee, Youngsoo; Harris, Patrick; Koh, Kwangwook; Kim, Keonyeop

    2011-07-15

    Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

  16. JC3 High Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Assessment Bulletins JC3 High

  17. JC3 Low Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Impact Assessment Bulletins JC3 Low

  18. JC3 Medium Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medium Impact Assessment Bulletins JC3 Medium

  19. ORO Verification of Employment Tracking System(VETS) PIA, Oak...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ORO Office Safeguards and Security Clearance Tracking System and Visitor Control System PIA, Oak Ridge Operations Office Occupational Medicine - Assistant PIA, Idaho National ...

  20. PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff ...

  1. PIA - Advanced Test Reactor National Scientific User Facility...

    Office of Environmental Management (EM)

    Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor ...

  2. PIA - Northeast Home Heating Oil Reserve System (Heating Oil...

    Energy Savers [EERE]

    Northeast Home Heating Oil Reserve System (Heating Oil) PIA - Northeast Home Heating Oil Reserve System (Heating Oil) PIA - Northeast Home Heating Oil Reserve System (Heating Oil)...

  3. PIA - Savannah River Nuclear Solution SRNS ProRad Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management...

  4. PIA - 10th International Nuclear Graphite Specialists Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Graphite Specialists Meeting registration web site PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - 10th International Nuclear Graphite ...

  5. PIA - WEB Unclassified Business Operations General Support System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support ...

  6. Corporate Human Resources Information Services (CHIRS) PIA, Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol ...

  7. PIA - WEB Unclassified Business Operations General Support System...

    Energy Savers [EERE]

    WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General...

  8. ORO Verification of Employment Tracking System(VETS) PIA, Oak...

    Energy Savers [EERE]

    System and Visitor Control System PIA, Oak Ridge Operations Office Occupational Medicine - Assistant PIA, Idaho National Laboratory Freedom of Information and Privacy Act...

  9. Hanford People Core (HCP) PIA, Richland Operations Office | Department...

    Energy Savers [EERE]

    E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop...

  10. Occupational Injury & Illness System (01&15) PIA, Idaho National...

    Energy Savers [EERE]

    Tracking Database, INL Energy Employees' Occupational Illness Compensation Program Occupational Medicine - Assistant PIA, Idaho National Laboratory VisitDosimBadgeTrckg-PIA.pdf...

  11. EERE Information Center Contact, PIA, The Office of Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Center Contact, PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Information Center Contact, PIA, The Office of Energy Efficiency and Renewable...

  12. Office of Personnel Management (OPM) Billing System PIA, Office...

    Energy Savers [EERE]

    Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security...

  13. PIA - Savannah River Nuclear Solution SRNS Electronic Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) MOX Services Unclassified Information System PIA, National...

  14. PIA - Savannah River Nuclear Solutions Badge Request and Site...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical and Logical Access System MOX Services ...

  15. PIA - Savannah River Nuclear Solutions Training Records and Informatio...

    Broader source: Energy.gov (indexed) [DOE]

    and Information Network (TRAIN) More Documents & Publications PIA - HSPD-12 Physical and Logical Access System PIA - WEB Unclassified Business Operations General Support System

  16. VisitDosimBadgeTrckg-PIA.pdf | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Database, INL Energy Employees' Occupational Illness Compensation Program PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - Tour Tracker

  17. PIA - Savannah River Operations Office Executive Commitment Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  18. EERE Project Management Center Database PIA, The Office of Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy...

  19. PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...

    Energy Savers [EERE]

    PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah...

  20. PRIVACY IMPACT ASSESSMENT: OCIO HSPD-12 Physical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Name of Information System or IT Project HSPD-12 Physical and Logical Access System Exhibit Project UID Project's Unique 10: 019-60-01-17-01-8062-04-404-140 (2010 UID) NewPIA D ...

  1. PIA - e-Foreign Ownership, Control, or Influence (FOCI) | Department of

    Energy Savers [EERE]

    Energy PIA - e-Foreign Ownership, Control, or Influence (FOCI) PIA - e-Foreign Ownership, Control, or Influence (FOCI) June 25, 2008 PIA - e-Foreign Ownership, Control, or Influence (FOCI) PDF icon PIA - e-Foreign Ownership, Control, or Influence (FOCI) More Documents & Publications PIA - Weapons Data Control Systems PIA - FITPLUS PIA - Foreign Travel Management System (FTMS)

  2. Assessing Climate Change Impacts, Vulnerability and Adaptation...

    Open Energy Info (EERE)

    Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability...

  3. Corporate Human Resources Information Services (CHIRS) PIA, Office of Human

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capitol Management | Department of Energy Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management PDF icon Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management More Documents & Publications MOX Services Unclassified

  4. PIA - Correspondence and Action Tracking System (CATS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PDF icon PIA - Correspondence and Action Tracking System (CATS) More Documents & Publications PIA - GovTrip (DOE data)

  5. PIA - Human Resources - Personal Information Change Request - Idaho

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Engineering Laboratory | Department of Energy - Personal Information Change Request - Idaho National Engineering Laboratory PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PDF icon PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory More Documents & Publications PIA - INL PeopleSoft

  6. LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA,...

  7. PIA - Advanced Test Reactor National Scientific User Facility Users Week

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 | Department of Energy Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 PDF icon PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - INL SECURITY INFORMATION

  8. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety

  9. PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boundary | Department of Energy IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PDF icon PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary More Documents & Publications PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Remediation

  10. PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) | Department of Energy (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PDF icon PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Site

  11. PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roster Systems | Department of Energy Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PDF icon PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical

  12. PIA - Savannah River Nuclear Solutions Electronic Safeguards Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (E3S) | Department of Energy Electronic Safeguards Security System (E3S) PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) PDF icon PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical and Logical

  13. PIA - Savannah River Nuclear Solutions Training Records and Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network (TRAIN) | Department of Energy Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PDF icon PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) More Documents & Publications PIA - HSPD-12 Physical and Logical Access System PIA - WEB Unclassified Business

  14. Manager's Signature Log Privacy Impact Assessment, Office of...

    Energy Savers [EERE]

    PIA - Tour Tracker Energy Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program...

  15. moveLINQ PIA, Office of the Chief Financial Officer | Department...

    Energy Savers [EERE]

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medicine - Assistant...

  16. eCommerce Suite, PIA, Pacific Northwest National Laboratory | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy eCommerce Suite, PIA, Pacific Northwest National Laboratory eCommerce Suite, PIA, Pacific Northwest National Laboratory eCommerce Suite, PIA, Pacific Northwest National Laboratory PDF icon eCommerce Suite, PIA, Pacific Northwest National Laboratory More Documents & Publications Manchester Software 1099 Reporting PIA, Idaho National Laboratory PIA - WEB iPASS System DOE PIA Occupational Medicine - Assistant PIA, Idaho National Laboratory

  17. A framework for combining social impact assessment and risk assessment

    SciTech Connect (OSTI)

    Mahmoudi, Hossein; Environmental Sciences Research Institute, Shahid Beheshti University, G.C. ; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, risk and social impact assessment (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: A hybrid model to combine SIA and SRA namely RSIA is proposed. RSIA can provide the proper mechanism to assess social impacts of natural hazards. RSIA can play the role of ex-post as well as ex-ante assessment. For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  18. DOE GovTrip PIA, Office of Corporate Information Systems | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy GovTrip PIA, Office of Corporate Information Systems DOE GovTrip PIA, Office of Corporate Information Systems DOE GovTrip PIA, Office of Corporate Information Systems PDF icon DOE GovTrip PIA, Office of Corporate Information Systems More Documents & Publications PIA - GovTrip (DOE data) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  19. PIA - INL PeopleSoft - Human Resource System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PeopleSoft - Human Resource System PIA - INL PeopleSoft - Human Resource System PIA - INL PeopleSoft - Human Resource System PDF icon PIA - INL PeopleSoft - Human Resource System More Documents & Publications PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory

  20. PIA - OpenGov UserVoice System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OpenGov UserVoice System PIA - OpenGov UserVoice System PIA - OpenGov UserVoice System PDF icon PIA - OpenGov UserVoice System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  1. eGIS Portal PIA, Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration PDF icon eGIS Portal PIA, Bonneville Power Administration More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant

  2. moveLINQ PIA, Office of the Chief Financial Officer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    moveLINQ PIA, Office of the Chief Financial Officer moveLINQ PIA, Office of the Chief Financial Officer moveLINQ PIA, Office of the Chief Financial Officer PDF icon moveLINQ PIA, Office of the Chief Financial Officer More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medicine - Assistant

  3. Manchester Software 1099 Reporting PIA, Idaho National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program PIA - INL Education Programs Business Enclave...

  4. EERE Project Management Center Database PIA, The Office of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency and Renewable Energy (EERE) | Department of Energy EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) PDF icon EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) More

  5. ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Operations Office | Department of Energy Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office PDF icon ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office More Documents &

  6. PIA - 10th International Nuclear Graphite Specialists Meeting registration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    web site | Department of Energy 10th International Nuclear Graphite Specialists Meeting registration web site PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PDF icon PIA - 10th International Nuclear Graphite Specialists Meeting registration web site More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  7. PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS System (EDWS) | Department of Energy SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PDF icon PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System

  8. PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illness Compensation Program Act (EEOICPA) | Department of Energy Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act

  9. LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer PDF icon LLNL MSP-GSS-001 PIA, Office of the Chief Information Officer More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho

  10. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Safety and Security Policy (SSP) SSP Home About Frequently Used Resources NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Continuity of Operations (COOP) Implementation Plan Contact Information Safety and Security Policy U.S. Department of Energy SC-31/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P:

  11. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Ames Site Office (AMSO) AMSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 National Environmental Policy Act (NEPA) Documents

  12. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Argonne Site Office (ASO) ASO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 National Environmental Policy Act (NEPA) Documents

  13. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  14. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Berkeley Site Office (BSO) BSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: Email Us National Environmental Policy Act (NEPA) Documents

  15. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Training NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements News Safety Data Sheets (SDS) for New Brunswick Laboratory Certified Reference Materials (CRM) Contact Information New Brunswick Laboratory U.S. Department of Energy Building 350

  16. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  17. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) SLAC Site Office (SSO) SSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 National Environmental Policy Act (NEPA) Documents Environmental

  18. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Office of Science (SC) Website

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 National Environmental Policy Act (NEPA)

  19. PIA - eTrack, Bechtel Jacobs Company LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eTrack, Bechtel Jacobs Company LLC PIA - eTrack, Bechtel Jacobs Company LLC PIA - eTrack, Bechtel Jacobs Company LLC PDF icon PIA - eTrack, Bechtel Jacobs Company LLC

  20. ITP Petroleum Refining: Impacts of Condition Assessment on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impacts of Condition Assessment on Energy Use: Selected Applications in Chemicals Processing and Petroleum Refining ITP Petroleum Refining: Impacts of Condition Assessment on...

  1. New Zealand-Climate Change Effects and Impacts Assessment | Open...

    Open Energy Info (EERE)

    Zealand-Climate Change Effects and Impacts Assessment Jump to: navigation, search Name Climate Change Effects and Impacts Assessment: A Guidance Manual for Local Government in New...

  2. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products PDF icon ...

  3. Assessing Impact of Biofuel Production on Regional Water Resource...

    Office of Environmental Management (EM)

    Assessing Impact of Biofuel Production on Regional Water Resource Use and Availability Assessing Impact of Biofuel Production on Regional Water Resource Use and Availability Dr. ...

  4. Nepal-Sectoral Climate Impacts Economic Assessment | Open Energy...

    Open Energy Info (EERE)

    Nepal-Sectoral Climate Impacts Economic Assessment (Redirected from Nepal Sectoral Climate impacts Economic Assessment) Jump to: navigation, search Name Nepal Sectoral Climate...

  5. Nepal-Sectoral Climate Impacts Economic Assessment | Open Energy...

    Open Energy Info (EERE)

    Nepal-Sectoral Climate Impacts Economic Assessment Jump to: navigation, search Name Nepal Sectoral Climate impacts Economic Assessment AgencyCompany Organization Climate and...

  6. MODARIA: Modelling and Data for Radiological Impact Assessment...

    Office of Environmental Management (EM)

    MODARIA: Modelling and Data for Radiological Impact Assessment Context and Overview MODARIA: Modelling and Data for Radiological Impact Assessment Context and Overview Presentation...

  7. PIA - Energy Contractor Registration System (EnCoRe) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Registration System (EnCoRe) PIA - Energy Contractor Registration System (EnCoRe) PIA - Energy Contractor Registration System (EnCoRe) PDF icon PIA - Energy Contractor Registration System (EnCoRe) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - 10th International Nuclear Graphite Specialists Meeting registration web site

  8. PIA - Form EIA-475 A/G Residential Energy Consumption Survey | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Form EIA-475 A/G Residential Energy Consumption Survey PIA - Form EIA-475 A/G Residential Energy Consumption Survey PIA - Form EIA-475 A/G Residential Energy Consumption Survey PDF icon PIA - Form EIA-475 A/G Residential Energy Consumption Survey More Documents & Publications FOIA Responses processed by DOE HQ in 2009 PIA - WEB iPASS System DOE PIA PIA - Security Clearance Work Tracking and Budget

  9. PIA - General Locator Information & Non-Employee System (GLI-NES) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy General Locator Information & Non-Employee System (GLI-NES) PIA - General Locator Information & Non-Employee System (GLI-NES) PIA - General Locator Information & Non-Employee System (GLI-NES) PDF icon PIA - General Locator Information & Non-Employee System (GLI-NES) More Documents & Publications PIA - FOIAXpress PIA - Form EIA-475 A/G Residential Energy Consumption Survey PIA - INL PeopleSoft - Human Resource

  10. PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ORO Web 2.0 Social Media Third-Party System (Facebook) PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) PDF icon PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - WEB Physical Security Major Application PIA - Security Clearance Work Tracking and Budget System

  11. PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PDF icon PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah

  12. Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine ...

  13. DOE GovTrip PIA, Office of Corporate Information Systems | Department...

    Energy Savers [EERE]

    Systems More Documents & Publications PIA - GovTrip (DOE data) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant...

  14. PIA - PAGE (Performance and Accountability for Grants in Energy System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporate Planning System (CPS) | Department of Energy PAGE (Performance and Accountability for Grants in Energy System Corporate Planning System (CPS) PIA - PAGE (Performance and Accountability for Grants in Energy System Corporate Planning System (CPS) PIA - PAGE (Performance and Accountability for Grants in Energy System Corporate Planning System (CPS) PDF icon PIA - PAGE (Performance and Accountability for Grants in Energy System Corporate Planning System (CPS) More Documents &

  15. PIA - PAGE (Performance and Accountability for Grants in Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAGE (Performance and Accountability for Grants in Energy System Corporate Planning System (CPS) PIA - PAGE (Performance and Accountability for Grants in Energy System Corporate ...

  16. PIA - Savannah River Nuclear Solutions (SRNS) Human Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)

  17. PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) Procurement ...

  18. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)

  19. PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol ...

  20. PIA - Oak Ridge Institute for Science and Education Program Applicant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applicant and Participant Status System (APSS) PDF icon PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) More...

  1. Environmental Assessment Fact Sheet - Potential Impacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE has prepared a draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. It examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assessment also looks at the potential cumulative impacts of conducting experiments and operating the WIPP as a transuranic waste repository. This fact sheet presents

  2. Noise and Vibration Impact Assessment Methodology | Department of Energy

    Energy Savers [EERE]

    Noise and Vibration Impact Assessment Methodology Noise and Vibration Impact Assessment Methodology This appendix provides detailed information on the methodology DOE used to develop the assessment of potential impacts from noise and vibration described in Sections 4.2.8 and 4.3.8 of the Rail Alignment EIS (DOE/EIS-0639D). PDF icon Noise and Vibration Impact Assessment Methodology More Documents & Publications Final Supplemental Environmental Impact Statement for a Geologic Repository for

  3. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office PDF icon Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA,

  4. Office of Personnel Management (OPM) Billing System PIA, Office of Health,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Security | Department of Energy Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security PDF icon Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security More Documents & Publications PIA - Security Clearance Work Tracking

  5. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products This March 28, ...

  6. MODARIA: Modelling and Data for Radiological Impact Assessment Context and

    Office of Environmental Management (EM)

    Overview | Department of Energy MODARIA: Modelling and Data for Radiological Impact Assessment Context and Overview MODARIA: Modelling and Data for Radiological Impact Assessment Context and Overview Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. PDF icon MODARIA: Modelling and Data for Radiological Impact Assessment Context and Overview More Documents

  7. PIA - ORO Web 2.0 Social Media Third-Party System (Facebook)...

    Energy Savers [EERE]

    ORO Web 2.0 Social Media Third-Party System (Facebook) PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) PIA - ORO Web 2.0 Social Media Third-Party System (Facebook) PDF...

  8. Finding of No Significant Impact Issued on Environmental Assessment for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remote-handled Waste Disposition Project at DOE�s Idaho Site Finding of No Significant Impact Issued on Environmental Assessment for Remote-handled Waste Disposition Project at DOE�s Idaho Site The U.S. Department of Energy has issued a Finding of No Significant Impact (FONSI) on the Final Environmental Assessment for the Remote-handled Waste Disposition Project. The environmental assessment analyzed potential environmental impacts of processing for disposition approximately 322 cubic

  9. The Environmental Style: Writing Environmental Assessments and Impact

    Energy Savers [EERE]

    Statements | Department of Energy The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide for EISs and EAs, prepared by DOE. PDF icon The Environmental Style: Writing Environmental Assessments and Impact Statements More Documents & Publications Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005 Lessons Learned Quarterly Report,

  10. Assessing the impacts of climate change on natural resource systems

    SciTech Connect (OSTI)

    Frederick, K.D.; Rosenberg, N.J. [eds.

    1994-11-30

    This volume is a collection of papers addressing the theme of potential impacts of climatic change. Papers are entitled Integrated Assessments of the Impacts of Climatic Change on Natural Resources: An Introductory Editorial; Framework for Integrated Assessments of Global Warming Impacts; Modeling Land Use and Cover as Part of Global Environmental Change; Assessing Impacts of Climatic Change on Forests: The State of Biological Modeling; Integrating Climatic Change and Forests: Economic and Ecological Assessments; Environmental Change in Grasslands: Assessment using Models; Assessing the Socio-economic Impacts of Climatic Change on Grazinglands; Modeling the Effects of Climatic Change on Water Resources- A Review; Assessing the Socioeconomic Consequences of Climate Change on Water Resources; and Conclusions, Remaining Issues, and Next Steps.

  11. An Assessment Of The External Radiological Impact In Areas Of...

    Open Energy Info (EERE)

    Assessment Of The External Radiological Impact In Areas Of Greece With Elevated Natural Radioactivity Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal...

  12. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting ...

  13. EERE Information Center Contact, PIA, The Office of Energy Efficiency and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy (EERE) | Department of Energy Information Center Contact, PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Information Center Contact, PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Information Center Contact, PIA, The Office of Energy Efficiency and Renewable Energy (EERE) PDF icon EERE Information Center Contact, PIA, The Office of Energy Efficiency and Renewable Energy (EERE) More Documents & Publications EERE Project

  14. Electronic DOE Information Security System (eDISS) PIA, Office of Health

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Security | Department of Energy DOE Information Security System (eDISS) PIA, Office of Health Safety and Security Electronic DOE Information Security System (eDISS) PIA, Office of Health Safety and Security Electronic DOE Information Security System (eDISS) PIA, Office of Health Safety and Security PDF icon Electronic DOE Information Security System (eDISS) PIA, Office of Health Safety and Security More Documents & Publications Integrated Safety Management Workshop

  15. ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office PDF icon ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office More Documents & Publications ORO Office Safeguards and Security Clearance Tracking System and Visitor

  16. Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resourses Management Division | Department of Energy SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division PDF icon Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division More Documents & Publications

  17. Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Injury & Illness System (01&15) PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PDF icon Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory More Documents & Publications Energy Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy

  18. PIA - HSPD-12 Physical and Logical Access System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HSPD-12 Physical and Logical Access System PIA - HSPD-12 Physical and Logical Access System PIA - HSPD-12 Physical and Logical Access System PDF icon PIA - HSPD-12 Physical and Logical Access System More Documents & Publications Policy Flash 2013-33 Department of Energy Order 206.2 Identity, Credential and Access Managment (ICAM) Audit Report: IG-0860 PIA - WEB Physical Security Major Application

  19. Determining Vulnerability Importance in Environmental Impact Assessment

    SciTech Connect (OSTI)

    Toro, Javier; Duarte, Oscar; Requena, Ignacio; Zamorano, Montserrat

    2012-01-15

    The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed. - Research Highlights: Black-Right-Pointing-Pointer The concept of vulnerability could be considered defining Vulnerability Importance included in qualitative EIA methodology. Black-Right-Pointing-Pointer The use of the concept of environmental vulnerability could reduce the subjectivity of qualitative methods of EIA. Black-Right-Pointing-Pointer A method to quantify the Vulnerability Importance proposed provides a comprehensive overview of the environmental state. Black-Right-Pointing-Pointer Results in Colombia highlight the usefulness and objectivity of this method.

  20. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  1. Impact Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    Opportunities 3b.1. Assess technical potential for sector technologies Renewable Energy Technical Potential Toolkit Building Energy Assessment Toolkit Power System Screening...

  2. Impact Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    Modeling the Global Trade and Environmental Impacts of Biofuel Policies Modified Microgrid Concept for Rural Electrification in Africa NREL-How to Estimate the Economic...

  3. ITP Petroleum Refining: Impacts of Condition Assessment on Energy Use:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected Applications in Chemicals Processing and Petroleum Refining | Department of Energy Impacts of Condition Assessment on Energy Use: Selected Applications in Chemicals Processing and Petroleum Refining ITP Petroleum Refining: Impacts of Condition Assessment on Energy Use: Selected Applications in Chemicals Processing and Petroleum Refining PDF icon condition_assessment.pdf More Documents & Publications Effective Fouling Minimization Increases the Efficiency and Productivity of

  4. ISC-Chicago Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Office Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  5. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  6. A qualitative method proposal to improve environmental impact assessment

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Duarte, Oscar; Zamorano, Montserrat

    2013-11-15

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: Concept of vulnerability has been used to calculate the importance impact assessment. This paper defined Total Impact Importance and specified a quantification procedure. The method includes the characteristics of environmental and project activities. The application has shown greater objectivity in the evaluation of impacts. Better correlation between impact values, environment and the project has been shown.

  7. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Impact Statements Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 National Environmental...

  8. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part I: Review of the Life-Cycle Energy Consumption of Incandescent, Compact Fluorescent, and LED ...

  9. PRIVACY IMPACT ASSESSMENT: SPRO Physical Security Major Application

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... JlIIV,<.l II I t l l l . l l '.1 YES 2 * PRIVACY IMPACT ASSESSMENT: SPRO - Physical ... Information on the Individual. 8. SONs Has a Privacy Act System of Records Notice ...

  10. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle ...

  11. Project Impact Assessments: Building America FY14 Field Test Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support - 2014 BTO Peer Review | Department of Energy Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Presenter: Lieko Earle, National Renewable Energy Laboratory The goal of this project is for the National Renewable Energy Laboratory to provide extensive, hands-on technical support to Building America teams in the areas of experiment

  12. Environmental Impact Statements and Environmental Assessments Status Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process, links to the project pages, and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation

  13. Development Impact Assessment (DIA) Case Study. South Africa

    SciTech Connect (OSTI)

    Cox, Sadie; Nawaz, Kathleen; Sandor, Debra

    2015-05-19

    This case study reviews South Africa’s experience in considering the impacts of climate change action on development goals, focusing on the South African energy sector and development impact assessments (DIAs) that have and could be used to influence energy policy or inform the selection of energy activities. It includes a review of assessments—conducted by government ministries, technical partners, and academic institutes and non-governmental organizations (NGOs)—that consider employment, health, and water implications of possible energy sector actions, as well as multi-criteria impact assessments.

  14. PIA - Oak Ridge Institute for Science and Education Program Applicant and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Participant Status System (APSS) | Department of Energy Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PDF icon PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) More

  15. Cumulative impacts in environmental assessments: How well are they considered

    SciTech Connect (OSTI)

    McCold, L. ); Holman, J. )

    1993-01-01

    The authors analyzed 89 environmental assessments published in the Federal Register from January 1 through June 30, 1992, to determine the extent to which their treatment of cumulative impacts met the requirements of 40 CFR 1500-1508. Only 35 (39%) EAs mentioned cumulative impacts. Nineteen EAs addressed cumulative impacts of some resources, but not others. The paper presents several recommendations: (1) past, present and reasonable foreseeable actions that could affect resources affected by the proposed action should be identified at the same time as, and be listed with, the proposed action. (2) for each resource, the discussion of cumulative impacts should follow immediately after the discussion of direct impacts to that resource. (3) conclusions about cumulative impacts should be supported by data and analyses. (4) agencies need a central review function to ensure the quality of their EAs.

  16. Social impact assessment - new dimensions in project planning

    SciTech Connect (OSTI)

    Jones, M.G.; Hartog, J.J.; Sykes, R.M.

    1996-11-01

    The Objective of the presentation is to provide understanding of how to improve attention to the social dimensions of EP projects. Social Impacts are the consequences to human populations, communities or individuals resulting from a project or activity. Such impacts may change the way in which people live, relate to one another, organize and cope as members of society. There is an increasing demand and expectation that Exploration and Production activities will both understand their impacts and define benefits for the local communities. Social Impact Assessment can be considered a branch of Environmental Impact Assessment. It has become a tool in its own fight due to the focus that was paid to the natural and physical issues within the EIA process. However there are still strong alignments and the wise project planner will integrate social and environmental issues within their project planning process. This can be done through a combination of studies but can result in a single report. The benefits of SIA will be demonstrated to include: (1) obtaining approvals (2) forward planning and design (3) increased project success-benefits to local community (4) economic benefits (5) decision making by management The types of impacts including demographic, socioeconomic, health, social infrastructure, resources, psychological and community, cultural and social equity will be reviewed. Methods and techniques to identify and assess impacts will be addressed. One of the main challenges in SIA is to reach the right audience. Methods to scope studies and implement consultation will be addressed.

  17. Environmental Impact Assessment (EIA) Process of V1 NPP Decommissioning

    SciTech Connect (OSTI)

    Matejovic, Igor; Polak, Vincent

    2007-07-01

    Through the adoption of Governmental Resolution No. 801/99 the Slovak Republic undertook a commitment to shutdown units 1 and 2 of Jaslovske Bohunice V 1 NPP (WWER 230 reactor type) in 2006 and 2008 respectively. Therefore the more intensive preparation of a decommissioning documentation has been commenced. Namely, the VI NPP Conceptual Decommissioning Plan and subsequently the Environmental Impact Assessment Report of VI NPP Decommissioning were developed. Thus, the standard environmental impact assessment process was performed and the most suitable alternative of V1 NPP decommissioning was selected as a basis for development of further decommissioning documents. The status and main results of the environmental impact assessment process and EIA report are discussed in more detail in this paper. (authors)

  18. Assessing human rights impacts in corporate development projects

    SciTech Connect (OSTI)

    Salcito, Kendyl; University of Basel, P.O. Box, CH-4003 Basel; NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202; NewFields, LLC, Denver, CO 80202 ; Utzinger, Jrg; University of Basel, P.O. Box, CH-4003 Basel ; Weiss, Mitchell G.; Mnch, Anna K.; Singer, Burton H.; Krieger, Gary R.; Wielga, Mark; NewFields, LLC, Denver, CO 80202

    2013-09-15

    Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projectsa uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance. -- Highlights: We developed a novel methodology for corporate human rights impact assessment. We piloted the methodology on two corporate projectsa mine and a plantation. Human rights impact assessment exposed impacts not foreseen in ESIA. Corporations adopted the majority of findings, but not necessarily immediately. Methodological advancements are expected for monitoring processes.

  19. A state-impact-state methodology for assessing environmental impact in land use planning

    SciTech Connect (OSTI)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). Matter-element (ME) and Extenics methods were embedded in the LUPEA. The model was applied to the LUPEA of Zoucheng County. The assessment shows improving environment quality since 2000 in Zoucheng County. The method provides a useful tool for the LUPEA in the county level.

  20. Gross national happiness as a framework for health impact assessment

    SciTech Connect (OSTI)

    Pennock, Michael; Ura, Karma

    2011-01-15

    The incorporation of population health concepts and health determinants into Health Impact Assessments has created a number of challenges. The need for intersectoral collaboration has increased; the meaning of 'health' has become less clear; and the distinctions between health impacts, environmental impacts, social impacts and economic impacts have become increasingly blurred. The Bhutanese concept of Gross National Happiness may address these issues by providing an over-arching evidence-based framework which incorporates health, social, environmental and economic contributors as well as a number of other key contributors to wellbeing such as culture and governance. It has the potential to foster intersectoral collaboration by incorporating a more limited definition of health which places the health sector as one of a number of contributors to wellbeing. It also allows for the examination of the opportunity costs of health investments on wellbeing, is consistent with whole-of-government approaches to public policy and emerging models of social progress.

  1. DOE F 206.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    206.1 DOE F 206.1 DOE F 206.1 Privacy Impact Assessment (PIA) File PIA Template June 2014 (Final).docx More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory

  2. Assessment of Environmental Impacts of Shell GTL Fuel | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Impacts of Shell GTL Fuel Assessment of Environmental Impacts of Shell GTL Fuel Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. PDF icon 2006_deer_cherrillo.pdf More Documents & Publications An Evaluation of Shell GTL Diesel Shell Gas to Liquids in the context of a Future Fuel Strategy - Technical Marketing Aspects Verification of Shell GTL Fuel

  3. Manual for Social Impact Assessment of Land-Based Carbon Projects...

    Open Energy Info (EERE)

    Impact Assessment of Land-Based Carbon Projects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Manual for Social Impact Assessment of Land-Based Carbon Projects Agency...

  4. PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) | Department of Energy MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System

  5. Development Impact Assessment (DIA) Case Study: South Africa

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Social impacts may include health (mortality and morbidity), poverty reduction, education, ... impacts and certain development impacts including GDP, employment, and povertywelfare. ...

  6. Social cost impact assessment of pipeline infrastructure projects

    SciTech Connect (OSTI)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  7. How social impact assessment can contribute to conflict management

    SciTech Connect (OSTI)

    Prenzel, Paula V. Vanclay, Frank

    2014-02-15

    The potential for conflict is omnipresent in all projects, and even in all human interactions, and conflict itself leads to many second-order social impacts. This article examines the contribution of the methodological approach used in social impact assessment (SIA) to conflict management. We view conflict as a process that has its own dynamic, and is to be expected in all situations. By using game theory (prisoner's dilemma), we describe and conceptualize this process and highlight the importance of communication in managing conflict. We demonstrate the potential use of SIA in preventing, managing and resolving conflict. Emphasis is placed on the participatory character of SIA and the role of public media. In contrast to existing literature, our focus is not restricted to the typical fields of study of SIA (e.g. environmental conflicts), but understands conflict itself as a field of application. In this sense, conflict-sensitive SIA can be understood both as an extension to the SIA tool kit and a broadening of the scope of SIA application. -- Highlights: Conflict is omnipresent and creates both positive and negative social impacts. Conflict itself represents a possible field of application for SIA. Conflict escalation is a process that can be modeled in a game-theoretic framework. There needs to be concerted effort to prevent escalation to avoid harmful outcomes. Conflict-sensitive SIA can support conflict management and sustainable resolution.

  8. Radiological Impact Assessment (RIA) following a postulated accident in PHWRS

    SciTech Connect (OSTI)

    Soni, N.; Kansal, M.; Rammohan, H. P.; Malhotra, P. K.

    2012-07-01

    Radiological Impact Assessment (RIA) following postulated accident i.e Loss of Coolant Accident (LOCA) with failed Emergency Core Cooling System (ECCS), performed as part of the reactor safety analysis of a typical 700 MWe Indian Pressurized Heavy Water Reactor(PHWR). The rationale behind the assessment is that the public needs to be protected in the event that the postulated accident results in radionuclide release outside containment. Radionuclides deliver dose to the human body through various pathways namely, plume submersion, exposure due to ground deposition, inhalation and ingestion. The total exposure dose measured in terms of total effective dose equivalent (TEDE) is the sum of doses to a hypothetical adult human at exclusion zone boundary by all the exposure pathways. The analysis provides the important inputs to decide upon the type of emergency counter measures to be adopted during the postulated accident. The importance of the various pathways in terms of contribution to the total effective dose equivalent(TEDE) is also assessed with respect to time of exposure. Inhalation and plume gamma dose are the major contributors towards TEDE during initial period of accident whereas ingestion and ground shine dose start dominating in TEDE in the extended period of exposure. Moreover, TEDE is initially dominated by I-131, Kr-88, Te-132, I-133 and Sr-89, whereas, as time progresses, Xe-133,I-131 and Te-132 become the main contributors. (authors)

  9. Data Compendium for the Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    Eslinger, P.W.; Huesties, L.R.; Maughan, A.D.; Miley, T.B.; Walters, W.H.

    1994-04-01

    The Columbia River Comprehensive Impact Assessment (CRCIA). The CRCIA is conducted by the Pacific Northwest Laboratory (PNL). The purpose of the CRCIA is to evaluate the current human and ecological risk from the Columbia River attributable to past and present activities on the Hanford Site. Human risk will be addressed for radioactive and hazardous materials over a range of river use options. Ecological risk will be evaluated relative to the health of the current river ecosystem. The initial effort for the CRCIA is the development of a compendium of existing data on Columbia River contamination. This document provides the data compendium. It also includes a discussion of data sources, descriptions of the physical format of the data, and descriptions of the search process used to identify data.

  10. Public participation in environmental impact assessment: why, who and how?

    SciTech Connect (OSTI)

    Glucker, Anne N.; Driessen, Peter P.J.; Kolhoff, Arend; Runhaar, Hens A.C.

    2013-11-15

    Even a cursory glance at the literature on environmental impact assessment (EIA) reveals that public participation is being considered as an integral part of the assessment procedure. Public participation in EIA is commonly deemed to foster democratic policy-making and to render EIA more effective. Yet a closer look at the literature unveils that, beyond this general assertion, opinions of the precise meaning, objectives and adequate representation of public participation in EIA considerably diverge. Against this background, in this article we aim to provide a comprehensive overview of the academic debate on public participation in EIA concerning its meaning, objectives and adequate level of inclusiveness. In so doing, we hope to stimulate a more focused debate on the subject, which is key to advancing the research agenda. Furthermore, this paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA practice. -- Highlights: There is little reflection on the meaning, objectives and adequate level of inclusiveness of public participation in EIA. We provide a comprehensive overview of the academic debate on public participation in EIA concerning the meaning, objectives and adequate level of inclusiveness. Theoretical claims put forth by scholars are contrasted with empirical evidence. Overview shall stimulate a more focused debate on the subject. This paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA.

  11. An equity tool for health impact assessments: Reflections from Mongolia

    SciTech Connect (OSTI)

    Snyder, Jeremy; Wagler, Meghan; Lkhagvasuren, Oyun; Laing, Lory; Davison, Colleen; Janes, Craig

    2012-04-15

    A health impact assessment (HIA) is a tool for assessing the potential effects of a project or policy on a population's health. In this paper, we discuss a tool for successfully integrating equity concerns into HIAs. This discussion is the product of collaboration by Mongolian and Canadian experts, and it incorporates comments and suggestions of participants of a workshop on equity focused HIAs that took place in Mongolia in October, 2010. Our motivation for discussing this tool is based on the observation that existing HIAs tend either to fail to define equity or use problematic accounts of this concept. In this paper we give an overview of socio-demographic and health indicators in Mongolia and briefly discuss its mining industry. We then review three accounts of equity and argue for the importance of developing a consensus understanding of this concept when integrating considerations of equity into an HIA. Finally, we present findings from the workshop in Mongolia and outline a tool, derived from lessons from this workshop, for critically considering and integrating the concept of equity into an HIA.

  12. Integrating environmental justice (EJ) methodologies into environmental impact assessment

    SciTech Connect (OSTI)

    Zimmerman, R.

    1995-12-01

    Environmental Justice (EJ) concerns are now a pervasive part of environmental policy. Moreover, Federal Executive Order 12898 mandates its diffusion throughout federal government programs, and many states are developing similar programs. EJ concerns first arose in the environmental field in the context of hazardous waste facilities. Thus, hazardous waste applications provide important analytical models for EJ issues addressed in other programs, such as environmental assessment (EA). At the present time, EJ concerns are treated largely qualitatively in EAs and environmental impact statements (EISs) in sections dealing with neighborhood and community character or socioeconomics. The manner in which EJ issues are examined in EISs is described using examples from recent EISs, and an approach to quantifying EJ in terms of demographic patterns is presented using techniques previously applied by the author to hazardous waste sites (primarily sites on the National Priorities List under the Superfund program). Various geographic levels and demographic parameters are discussed and compared. A key point is the manner in which the choice of a comparison area influences conclusions about a particular area. these methods are critical in addressing such issues as whether proposed projects are being located in areas with relatively greater proportions of {open_quotes}vulnerable{close_quotes} populations or, in the case of public service projects, how these populations are served relative to other populations by the facilities that are the subject of the assessment.

  13. Stakeholder participation in health impact assessment: A multicultural approach

    SciTech Connect (OSTI)

    Negev, Maya; Davidovitch, Nadav; Garb, Yaakov; Tal, Alon

    2013-11-15

    The literature on impact assessment (HIA) registers the importance of stakeholder participation in the assessment process, but still lacks a model for engaging stakeholders of diverse ethnic, professional and sectorial backgrounds. This paper suggests that the multicultural approach can contribute to HIA through a revision of the generic 5-step HIA model, and its implementation in a metropolitan plan in Southern Israel. The health issue scoped by the stakeholders in the HIA is related to land uses in the vicinity of the national hazardous industry and hazardous waste site. The stakeholders were representatives of the diverse populations at stake, including rural Bedouins and Jewish city dwellers, as well as representatives from the public sector, private sector, non-governmental organizations and academia. The case study revealed that a multicultural stakeholder participation process helps to uncover health issues known to the community which were not addressed in the original plan, and provides local knowledge regarding health conditions that is especially valuable when scientific data is uncertain or absent. It enables diverse stakeholders to prioritize the health issues that will be assessed. The case study also reveals ways in which the model needs revisions and improvements such as in recruitment of diverse participants. This paper presents a multicultural model of HIA and discusses some of the challenges that are faced when HIA is implemented in the context of current decision-making culture. -- Highlights: We revised the generic HIA model in light of the multicultural approach. We tested the model in a case study of zoning a hazardous industry site. Multicultural stakeholder participation uncovers health issues known to communities. It enables community prioritization of health issues. We present a model for multicultural stakeholder participation in HIA.

  14. Text Alternative Version: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products" webcast, held March 28, 2013.

  15. Preliminary Assessment of the Impact of 2014 Seismic Study on WTP Design

    Broader source: Energy.gov [DOE]

    Preliminary Assessment of the Impact of 2014 Seismic Study on WTP Design Carl Costantino, Consultant to DOE Raman Venkata, DOE-WTP-WED,Richland,WA Farhang Ostadan, BNI

  16. Environmental impact assessment in Sri Lanka: A progress report

    SciTech Connect (OSTI)

    Butler, J.W.

    1995-12-01

    The paper reports on progress by the Government of Sri Lanka in the implementation of a formal environmental impact assessment (EIA) requirement. The authors have recently conducted several activities in Sri Lanka intended to improve the analytical quality of EIA documents and the utility of the EIA process in government decisionmaking, with particular attention to the use of programmatic or sectoral EIAs. The U.S. Agency for International Development established a 5-year project, the Natural Resources and Environmental Policy Project (NAREPP), to provide training and technical assistance in EIA and related disiplines for the Central Environmental Authority (CEA), several other Sri Lanka government agencies, and the private sector. This activity has involved efforts to expand the technical expertise within Sri Lanka for conducting EIA, which include developing EIA courses and materials in cooperation with several universities and conducting intensive training programs for both government and private-sector environmental professionals. This EIA will focus on the selection of government-approved industrial estates throughout the country, on which most new industrial development projects are to be located. Further training programs in the use of current analytical methodologies for EIA were also developed and conducted. The effectiveness of these activities can be assessed by evaluating changes in the content and quality of subsequent EIA documents and in the extent to which such documents affect environmental decisionmaking in Sri Lanka. The authors discuss the role of the programmatic EIA in the industrial development program of Sri Lanka, remaining constraints on the EIA process, and recommendations for further improvement.

  17. Assessing corporate project impacts in changeable contexts: A human rights perspective

    SciTech Connect (OSTI)

    Salcito, Kendyl; Singer, Burton H.; Krieger, Gary R.; Weiss, Mitchell G.; Wielga, Mark; Utzinger, Jrg

    2014-07-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: Corporate capital projects affect human rights in myriad ways. Ongoing, longitudinal impact assessment techniques are needed. We present an approach for conducting longitudinal human rights impact assessment. Our methodology allows distinguishing corporate impacts from contextual changes. Promptly observing context changes and impacts enables companies to react nimbly.

  18. The people problems of NEPA: Social impact assessment and the role of public involvement

    SciTech Connect (OSTI)

    Carnes, S.A.

    1989-12-31

    This Chapter of the book `` The Scientific Challenges of NEPA`` discusses the people problems of NEPA and social impact assessment and the role of public involvement in NEPA. When Congress passed the National Environmental Policy Act (NEPA) in 1969, there was little guidance on the preparation of environmental impact statements (EIS) and the role of the public in the NEPA process. Excepting the statutory language of NEPA, which referred to impacts on the human environment, nowhere was this more evident than with respect to people. Questions such as what impacts on people should be assessed, how impacts on people should be assessed, and how people, including but not limited to those persons potentially impacted, should be involved in the assessment itself as well as NEPA`s associated administrative processes, were simply not addressed.

  19. Walking the sustainability assessment talk - Progressing the practice of environmental impact assessment (EIA)

    SciTech Connect (OSTI)

    Morrison-Saunders, Angus; Retief, Francois

    2012-09-15

    Internationally there is a growing demand for environmental impact assessment (EIA) to move away from its traditional focus towards delivering more sustainable outcomes. South Africa is an example of a country where the EIA system seems to have embraced the concept of sustainability. In this paper we test the existing objectives for EIA in South Africa against sustainability principles and then critique the effectiveness of EIA practice in delivering these objectives. The outcome of the research suggests that notwithstanding a strong and explicit sustainability mandate through policy and legislation, the effectiveness of EIA practice falls far short of what is mandated. This shows that further legislative reform is not required to improve effectiveness but rather a focus on changing the behaviour of individual professionals. We conclude by inviting further debate on what exactly practitioners can do to give effect to sustainability in EIA practice.

  20. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Energy Savers [EERE]

    Products | Department of Energy Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products This March 28, 2013 webcast reviewed DOE's recently completed three-part study of the life-cycle energy and environmental impacts of LED lighting products relative to incandescent and CFL alternatives. The reports for Parts 1 and 2 were published in February 2012 and June 2012, respectively,

  1. Assessing Impact of Biofuel Production on Regional Water Resource Use and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability | Department of Energy Assessing Impact of Biofuel Production on Regional Water Resource Use and Availability Assessing Impact of Biofuel Production on Regional Water Resource Use and Availability Dr. May Wu, ANL, 8/15/12 webinar presentation on the environmental impacts attributable to wastewater from biofuels production. PDF icon wu_webinar.pdf More Documents & Publications Achieving Water-Sustainable Bioenergy Production Breaking the Biological Barriers to Cellulosic

  2. Advancing the theory and practice of impact assessment: Setting the research agenda

    SciTech Connect (OSTI)

    Pope, Jenny; School of Geo and Spatial Sciences, North-West University, Potchefstroom Campus, Private Bag X6001, Potchefstroom 2520; Curtin University Sustainability Policy Institute, GPO Box U1987, Perth WA 6845 ; Bond, Alan; School of Environmental Sciences, University of East Anglia, Norwich Research Park, Norwich, Norfolk NR4 7TJ ; Morrison-Saunders, Angus; School of Geo and Spatial Sciences, North-West University, Potchefstroom Campus, Private Bag X6001, Potchefstroom 2520; School of Environmental Science, Murdoch University, South St, Murdoch WA 6150 ; Retief, Francois

    2013-07-15

    Impact assessment has been in place for over 40 years and is now practised in some form in all but two of the world's nations. In this paper we reflect on the state of the art of impact assessment theory and practice, focusing on six well-established forms: EIA, SEA, policy assessment, SIA, HIA and sustainability assessment. We note that although the fundamentals of impact assessment have their roots in the US National Environmental Policy Act 1969 (NEPA) each branch of the field is distinct in also drawing on other theoretical and conceptual bases that in turn shape the prevailing discourse in each case, generating increasing degrees of specialisation within each sub-field. Against this backdrop, we consider the strengths and weaknesses of collective impact assessment practice, concluding that although there are substantial strengths, the plethora of specialist branches is generating a somewhat confusing picture and lack of clarity regarding how the pieces of the impact assessment jigsaw puzzle fit together. We use this review to suggest an overarching research agenda that will enable impact assessment to evolve in line with changing expectations for what it should deliver. -- Highlights: ? Strengths, weakness, opportunities and threats for IA are explored in this paper ? EIA, SEA, policy assessment, SIA, HIA and sustainability assessment are reviewed ? Diversity of practice is both a strength and weakness in the current economic climate ? There are opportunities to simplify IA by focusing on common and fundamental elements ? Continued research into theory related to IA effectiveness is also essential.

  3. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Part 2: LED Manufacturing and Performance Scholand, Michael; Dillon, Heather E. 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE;...

  4. Category:LEDSGP Development Impacts Assessment Toolkits | Open...

    Open Energy Info (EERE)

    Model S SEAGA Intermediate Level Handbook SimCLIM Simple Interactive Models for better air quality (SIM-air) Simplified Approach for Estimating Impacts of Electricity Generation...

  5. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    category of hazardous waste to landfill, which is driven by the upstream energy and environment impacts from the manufacturing of the aluminum from raw materials. Although...

  6. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Office of Scientific and Technical Information (OSTI)

    Products, Part 3: LED Environmental Testing (Technical Report) | SciTech Connect Technical Report: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing This report covers the third part of a larger U.S. Department of Energy (DOE) project to assess the life-cycle

  7. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Products, Part 3: LED Environmental Testing (Technical Report) | SciTech Connect Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing This report covers the third part of a larger U.S. Department of Energy (DOE) project to assess the life-cycle environmental and

  8. Legal and institutional framework of environmental impact assessment in Nigeria: An initial assessment

    SciTech Connect (OSTI)

    Olokesusi, F.

    1998-03-01

    Nigeria, the most populous country in Africa, has high rates of urbanization and industrialization. Until recently, decisions on most large-scale projects such as expressways, harbors, industries, dams, and irrigation were considered with an emphasis on traditional technical and cost-benefit analysis. Spurred by massive environmental degradation and persistent community agitation in oil producing areas, environmental impact assessment (EIA) legislation was passed in late 1992. The main purpose of this article is to review and assess the content of this legislation and the guidelines produced by the Federal Environmental Protection Agency (FEPA), the institution responsible for EIA administration. Some EIA reports have been prepared and reviewed by FEPA since 1994. There are some positive outcomes and expectations, but some problems have been identified as well, including: deliberate restriction of public involvement and participation by proponents and/or their consultants, interagency conflict leading to high cost and project delays especially in the oil industry, and restriction of public access to final EIA reports. These are discussed, and recommendations for improving the process are made.

  9. Adaptation strategies for health impacts of climate change in Western Australia: Application of a Health Impact Assessment framework

    SciTech Connect (OSTI)

    Spickett, Jeffery T.; Brown, Helen L.; Katscherian, Dianne

    2011-04-15

    Climate change is one of the greatest challenges facing the globe and there is substantial evidence that this will result in a number of health impacts, regardless of the level of greenhouse gas mitigation. It is therefore apparent that a combined approach of mitigation and adaptation will be required to protect public health. While the importance of mitigation is recognised, this project focused on the role of adaptation strategies in addressing the potential health impacts of climate change. The nature and magnitude of these health impacts will be determined by a number of parameters that are dependent upon the location. Firstly, climate change will vary between regions. Secondly, the characteristics of each region in terms of population and the ability to adapt to changes will greatly influence the extent of the health impacts that are experienced now and into the future. Effective adaptation measures therefore need to be developed with these differences in mind. A Health Impact Assessment (HIA) framework was used to consider the implications of climate change on the health of the population of Western Australia (WA) and to develop a range of adaptive responses suited to WA. A broad range of stakeholders participated in the HIA process, providing informed input into developing an understanding of the potential health impacts and potential adaptation strategies from a diverse sector perspective. Potential health impacts were identified in relation to climate change predictions in WA in the year 2030. The risk associated with each of these impacts was assessed using a qualitative process that considered the consequences and the likelihood of the health impact occurring. Adaptations were then developed which could be used to mitigate the identified health impacts and provide responses which could be used by Government for future decision making. The periodic application of a HIA framework is seen as an ideal tool to develop appropriate adaptation strategies to address the potential health impacts of climate change.

  10. Assessing Impact of Biofuel Production on Regional Water Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact of Biofuel Production on Regional Water Resource Use and Availability May Wu Ph.D. ... 15, 2012 Biofuel Is a Key Component in Water-Energy Nexus 1 2 Potential Cellulosic ...

  11. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    assessment (LCA) process and methodology, provided a literature review of more ... DOE Contract Number: AC05-76RL01830 Resource Type: Technical Report Research Org: Pacific ...

  12. Environmental impact assessment of abnormal events: a follow-up study

    SciTech Connect (OSTI)

    Hunsaker, D.B. Jr.; Lee, D.W.

    1985-01-01

    Impact analyses included in environmental assessments for a selected nuclear power plant, petroleum storage facility, crude oil pipeline, and geopressure well that have experienced operational, abnormal events are compared with the data quantifying the environmental impacts of the events. Comparisons of predicted vs actual impacts suggests that prediction of the types of events and associated impacts could be improved; in some instances, impacts have been underestimated. Analysis of abnormal events is especially important in environmental assessment documents addressing a technology that is novel or unique to a particular area. Incorporation of abnormal event impact analysis into project environmental monitoring and emergency response plans can help improve these plans and can help reduce the magnitude of environmental impacts resulting from said events.

  13. Socioeconomic impact assessment and nuclear power plant licensing, Greene County, New York

    SciTech Connect (OSTI)

    Peelle, E.

    1980-01-01

    The paper reviews the setting, participants and status of the joint federal-state hearings, findings of the FES, problems of conducting social impact assessment (SIA) for the GCNPP, and the nature and effect of public participation in the formal, legalistic hearings process. The GCNPP is evaluated in terms of trends in Atomic Energy Commission-Nuclear Regulatory Commission social impact assessments from 1972 to 1979. Progress in the adequacy and relevance of social impact assessment is defined according to steps in a lengthy, evolutionary legitimation process.

  14. Cumulative impact assessments and bird/wind farm interactions: Developing a conceptual framework

    SciTech Connect (OSTI)

    Masden, Elizabeth A.; Fox, Anthony D.; Furness, Robert W.; Bullman, Rhys; Haydon, Daniel T.

    2010-01-15

    The wind power industry has grown rapidly in the UK to meet EU targets of sourcing 20% of energy from renewable sources by 2020. Although wind power is a renewable energy source, there are environmental concerns over increasing numbers of wind farm proposals and associated cumulative impacts. Individually, a wind farm, or indeed any action, may have minor effects on the environment, but collectively these may be significant, potentially greater than the sum of the individual parts acting alone. EU and UK legislation requires a cumulative impact assessment (CIA) as part of Environmental Impact Assessments (EIA). However, in the absence of detailed guidance and definitions, such assessments within EIA are rarely adequate, restricting the acquisition of basic knowledge about the cumulative impacts of wind farms on bird populations. Here we propose a conceptual framework to promote transparency in CIA through the explicit definition of impacts, actions and scales within an assessment. Our framework requires improved legislative guidance on the actions to include in assessments, and advice on the appropriate baselines against which to assess impacts. Cumulative impacts are currently considered on restricted scales (spatial and temporal) relating to individual development EIAs. We propose that benefits would be gained from elevating CIA to a strategic level, as a component of spatially explicit planning.

  15. Sustainable Land-use Impact Assessment Toolkit | Open Energy...

    Open Energy Info (EERE)

    public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development...

  16. Assessing the impact of energy losses in steam systems

    SciTech Connect (OSTI)

    Fischer, D.W.

    1995-07-10

    This article examines the impact of steam leaks on the efficiency of the process steam system. The topics include steam losses under various operating conditions and orifice sizes, failed drip traps, the significance of small leaks, energy losses and pollutants generated by trap failure, steps to take to conserve steam and energy through repair and maintenance.

  17. Appendix C. Part 303 Wetland Permit Application, Wetland Impact Assessment and Compensatory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C. Part 303 Wetland Permit Application, Wetland Impact Assessment and Compensatory Mitigation Proposal DOE/EA-1709 C-1 APPENDIX C. PART 303 WETLAND PERMIT APPLICATION, WETLAND IMPACT ASSESSMENT AND COMPENSATORY MITIGATION PROPOSAL On January 28, 2010, Compact Power, Inc. submitted a Part 303 Wetland Permit Application, which contains a compensatory mitigation proposal, to the Michigan Department of Natural Resources and Environment. The application and proposal are contained in this appendix.

  18. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Office of Scientific and Technical Information (OSTI)

    Products Part 2: LED Manufacturing and Performance (Technical Report) | SciTech Connect Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Part 2 of the project (this report) uses the conclusions from Part 1 as a point of departure to focus on two

  19. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Office of Scientific and Technical Information (OSTI)

    Products, Part 3: LED Environmental Testing (Technical Report) | SciTech Connect Technical Report: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's

  20. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Products Part 2: LED Manufacturing and Performance (Technical Report) | SciTech Connect Technical Report: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Part 2 of the project (this report) uses the conclusions from Part 1 as a point of departure to

  1. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    SciTech Connect (OSTI)

    Peltonen, Lasse; Sairinen, Rauno

    2010-09-15

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  2. Setting boundaries of participation in environmental impact assessment

    SciTech Connect (OSTI)

    Salomons, Geoffrey H.; Hoberg, George

    2014-02-15

    Public participation processes are touted as an effective way to increase the capacity and legitimacy of environmental assessment and the regulatory process that rely on them. Recent changes to the Canadian environmental assessment process narrowed the criteria for who can participate in environmental assessments from any who were interested to those who were most directly affected. This article examines the potential consequences of this change by exploring other areas of Canadian regulatory law where a similar directed affected test has been applied. This new standard risks institutionalizing the long-understood representational bias confronted by more diffuse interest like environmental protection. Restricting participation to the directly affected is far too narrow a test for processes like environmental assessment that are designed to determine the public interest. -- Highlights: Public participation can improve the legitimacy of environmental assessments. New Canadian rules narrow the range of eligible participants. Similar rules in Alberta have excluded environmental representation. The new rules may institutionalize bias against more diffuse interests. Restricting participation to the directly affected is far too narrow.

  3. Assessment of the Value, Impact, and Validity of the Jobs and Economic Development Impacts (JEDI) Suite of Models

    SciTech Connect (OSTI)

    Billman, L.; Keyser, D.

    2013-08-01

    The Jobs and Economic Development Impacts (JEDI) models, developed by the National Renewable Energy Laboratory (NREL) for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE), use input-output methodology to estimate gross (not net) jobs and economic impacts of building and operating selected types of renewable electricity generation and fuel plants. This analysis provides the DOE with an assessment of the value, impact, and validity of the JEDI suite of models. While the models produce estimates of jobs, earnings, and economic output, this analysis focuses only on jobs estimates. This validation report includes an introduction to JEDI models, an analysis of the value and impact of the JEDI models, and an analysis of the validity of job estimates generated by JEDI model through comparison to other modeled estimates and comparison to empirical, observed jobs data as reported or estimated for a commercial project, a state, or a region.

  4. Toolkit for Integrated Impact Assessments version 1.0

    Energy Science and Technology Software Center (OSTI)

    2007-05-14

    TIIA is designed to perform ecological and human risk assessments for environmental contaminants in air, water, soil, and sediment. It uses a novel approach that applies to radionuclides and hazardous chemicals, based on a food web approach. Stochastic calculations (i.e., those that allow for propagation of uncertainty in a numerical fashion) are allowed.

  5. Health impact assessment in planning: Development of the design for health HIA tools

    SciTech Connect (OSTI)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-15

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  6. Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction

    SciTech Connect (OSTI)

    Karjalainen, Timo P., E-mail: timopauli.karjalainen@oulu.f [Thule Institute, University of Oulu, P.O. Box 7300, FI-90014 University of Oulu (Finland); Jaervikoski, Timo, E-mail: timo.jarvikoski@oulu.f [Unit of Sociology, University of Oulu, P.O. Box 2000, FI-90014 University of Oulu (Finland)

    2010-09-15

    In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

  7. Social impact assessment in mining projects in Northern Finland: Comparing practice to theory

    SciTech Connect (OSTI)

    Suopajrvi, Leena

    2013-09-15

    The paper discusses social impact assessments (SIA) for mining projects in light of the international principles and guidelines for such assessments and the academic literature in the field. The data consist of environmental impact assessment (EIA) programmes and reports for six mining projects that have started up in northern Finland in the 2000s. A first observation is that the role of the SIAs in the EIA programmes and reports studied was quite minor: measured in number of pages, the assessments account for three or four percent of the total. This study analyses the data collection, research methodology and conceptual premises used in the SIAs. It concludes that the assessments do not fully meet the high standards of the international principles and guidelines set out for them: for example, elderly men are over-represented in the data and no efforts were made to identify and bring to the fore vulnerable groups. Moreover, the reliability of the assessments is difficult to gauge, because the qualitative methods are not described and where quantitative methods were used, details such as non-response rates to questionnaires are not discussed. At the end of the paper, the SIAs are discussed in terms of Jrgen Habermas' theory of knowledge interests, with the conclusion that the assessments continue the empirical analytical tradition of the social sciences and exhibit a technical knowledge interest. -- Highlights: Paper investigates social impact assessments in Finnish mining projects. Role of social impact assessment is minor in whole EIA-process. Mining SIAs give the voice for elderly men, vulnerable groups are not identified. Assessment of SIAs is difficult because of lacking transparency in reporting. SIAs belong to empirical analytical tradition with technical knowledge interest.

  8. Impact assessment and performance targets for lighting and envelope systems

    SciTech Connect (OSTI)

    Sullivan, R.; Lee, E.S.; Selkowitz, S.

    1992-06-01

    Electric lighting loads and cooling from solar heat gains and from lights are the two largest components of peak demand in commercial buildings. The most cost effective demand side management solutions are generally those that directly reduce or eliminate these loads. Existing technologies can provide modest reductions, however they are typically applied an a piecemeal manner that yields less than optimal results. The full potential of existing technologies will be realized when they are commercially available in an integrated package easily specifiable by architects and engineers. Emerging technologies can also be developed to provide even greater savings and extend the savings over a greater portion of the building floor area. This report assesses achievable energy and peak demand performance in California commercial buildings with technologies available today and in the future. We characterize energy performance over a large range of building envelope and lighting conditions, both through computer simulation models and through case study measured data, and subsequently determine reasonable energy targets if building design were further optimized with integrated systems of current or new technologies. Energy targets are derived from the study after consideration of industry priorities, design constraints, market forces, energy code influence, and the state of current building stock.

  9. A protocol for lifetime energy and environmental impact assessment of building insulation materials

    SciTech Connect (OSTI)

    Shrestha, Som S. Biswas, Kaushik; Desjarlais, Andre O.

    2014-04-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist, which provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different building insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines. - Highlights: We proposed a protocol to evaluate the environmental impacts of insulation materials. The protocol considers all life cycle stages of an insulation material. Both the direct environmental impacts and the indirect impacts are defined. Standardized calculation methods for the avoided operational energy is defined. Standardized calculation methods for the avoided environmental impact is defined.

  10. The role of the international professional organization in the growth and development of environmental impact assessment

    SciTech Connect (OSTI)

    Voland, M.E. ); Page, J.M. )

    1993-01-01

    Environmental impact assessment is an international phenomenon. A concept begun by the National Environmental Policy Act (NEPA) of 1969 in the US is becoming an important component of development planning throughout the world. In the summer of 1992, professionals from 44 countries attended the annual meeting of the International Association for Impact Assessment (IAIA). The impact studies can go beyond the project focus of the US to encompass regional and country planning. Through active involvement in the meetings of the international professional organization, the environmental professional has the opportunity to hear formal presentations by those who have differing experiences based upon what is possible within their political and cultural systems. Further, informal interaction at these meetings provides the opportunity to share information, and learn from one another. This presentation will address the role of the professional organization in supporting environmental impact assessment internationally, particularly in developing nations; ways the professional organization can fulfill that role; and how a particular organization, the International Association for Impact Assessment, addresses these challenges.

  11. Testing three health impact assessment tools in planning: A process evaluation

    SciTech Connect (OSTI)

    Schively Slotterback, Carissa; Forsyth, Ann; Krizek, Kevin J.; Johnson, Amanda; Pennucci, Aly

    2011-03-15

    There is increasing interest in Health Impact Assessment in planning. This paper describes the results of different approaches to health impact assessment (HIA) conducted in 10 municipalities and one county in Minnesota. The paper outlines the HIA processes, outputs, and short-term outcomes concluding that it is important to engage a diverse group of stakeholders. Overall, HIA is potentially an important new tool in the planning toolkit. Strategic use of HIA to evaluate draft plans and inform plan updates and project redesigns can help raise awareness about health issues and focus planning on important human problems.

  12. A Protocol for Lifetime Energy and Environmental Impact Assessment of Building Insulation Materials

    SciTech Connect (OSTI)

    Shrestha, Som S; Biswas, Kaushik; Desjarlais, Andre Omer

    2014-01-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors, and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist that provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines.

  13. DOE issues Finding of No Significant Impact on Environmental Assessment for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site doe logo U.S. Department of Energy Idaho Operations Office Media Contact: Tim Jackson (208) 526-8484 For Immediate Release December 21, 2011 DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site Idaho Falls, ID � After completing a careful assessment, the U.S.

  14. Facilitating communities in designing and using their own community health impact assessment tool

    SciTech Connect (OSTI)

    Cameron, Colleen; Ghosh, Sebanti; Eaton, Susan L.

    2011-07-15

    Reducing health inequities and improving the health of communities require an informed public that is aware of the social determinants of health and how policies and programs have an impact on the health of their communities. People Assessing Their Health (PATH) is a process that uses community-driven health impact assessment to build the capacity of people to become active participants in the decisions that affect the well-being of their community. The PATH process is both a health promotion and a community development approach that builds people's ability to bring critical analysis to a situation and to engage in effective social action to bring about desired change. Because it increases analytical skills and provides communities with their own unique tool to assess the potential impact of projects, programs or policies on the health and well-being of their community it is an empowering process. PATH was originally used in three communities in northeastern Nova Scotia, Canada in 1996 when the Canadian health care system was being restructured to a more decentralized system. Since then it has been used in other communities in Nova Scotia and India. This paper will describe the PATH process and the use of the community health impact assessment as well as the methodology used in the PATH process. The lessons learned from PATH's experiences of building capacity among the community in Canada and India will be presented.

  15. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  16. A review and critique of the socioeconomic impact assessment for the Kahe Point Ocean Thermal Energy Conversion (OTEC) facility

    SciTech Connect (OSTI)

    Bowen, R; Gopalakrishnan, C; Samples, K

    1988-01-01

    This report addresses the adequacy of Ocean Thermal Corporation's socioeconomic impact assessment of its 40-MWe closed-cycle ocean thermal energy conversion (OTEC) pilot plant proposed for Kahe Point, Oahu, Hawaii. The socioeconomic impacts identified as relevant to the plant were assessed in detail, including potential economic-demographic, public-service and fiscal, ocean-use, aesthetic, cultural, and energy impacts. The economic-demographic impact assessment does not estimate the full extent of population and income changes or second-order effects associated with the plant. There is no subjective assessment of perceptions on the part of local communities concerning probable changes in land values, housing, and population. Anticipated public-service and fiscal impacts are found to be relatively unimportant; however, the measurement of the impact of the plant on tax revenues needs improvement. The assessment does not sufficiently consider the objective and subjective assessment of ocean-use, aesthetic, and cultural impacts, which are of major significance to the local communities. The quantification of physical impacts, perceptions of impacts, and potential mitigation measures is inadequate. The energy impacts need to be updated to reflect the recent declines in oil prices and price projections. An assessment of low-probability, high-risk occurrences may be necessary. 12 refs., 3 tabs.

  17. Value impact assessment: A preliminary assessment of improvement opportunities at the Quantico Central Heating Plant

    SciTech Connect (OSTI)

    Brambley, M.R.; Weakley, S.A.

    1990-09-01

    This report presents the results of a preliminary assessment of opportunities for improvement at the US Marine Corps (USMC) Quantico, Virginia, Central Heating Plant (CHP). This study is part of a program intended to provide the CHP staff with a computerized Artificial Intelligence (AI) decision support system that will assist in a more efficient, reliable, and safe operation of their plant. As part of the effort to provide the AI decision support system, a team of six scientists and engineers from the Pacific Northwest Laboratory (PNL) visited the plant to characterize the conditions and environment of the CHP. This assessment resulted in a list of potential performance improvement opportunities at the CHP. In this report, 12 of these opportunities are discussed and qualitatively analyzed. 70 refs., 7 figs., 6 tabs.

  18. Health impact assessment in the United States: Has practice followed standards?

    SciTech Connect (OSTI)

    Schuchter, Joseph; Bhatia, Rajiv; Corburn, Jason; Seto, Edmund

    2014-07-01

    As an emerging practice, Health Impact Assessment is heterogeneous in purpose, form, and scope and applied in a wide range of decision contexts. This heterogeneity challenges efforts to evaluate the quality and impact of practice. We examined whether information in completed HIA reports reflected objectively-evaluable criteria proposed by the North American HIA Practice Standards Working Group in 2009. From publically-available reports of HIAs conducted in the U.S. and published from 2009 to 2011, we excluded those that were components of, or comment letters on, Environmental Impact Assessments (5) or were demonstration projects or student exercises (8). For the remaining 23 reports, we used practice standards as a template to abstract data on the steps of HIA, including details on the rationale, authorship, funding, decision and decision-makers, participation, pathways and methods, quality of evidence, and recommendations. Most reports described screening, scoping, and assessment processes, but there was substantial variation in the extent of these processes and the degree of stakeholder participation. Community stakeholders participated in screening or scoping in just two-thirds of the HIAs (16). On average, these HIAs analyzed 5.5 determinants related to 10.6 health impacts. Most HIA reports did not include evaluation or monitoring plans. This study identifies issues for field development and improvement. The standards might be adapted to better account for variability in resources, produce fit-for-purpose HIAs, and facilitate innovation guided by the principles. - Highlights: Our study examined reported HIAs in the U.S. against published practice standards. Most HIAs used some screening, scoping and assessment elements from the standards. The extent of these processes and stakeholder participation varied widely. The average HIA considered multiple health determinants and impacts. Evaluation or monitoring plans were generally not included in reports.

  19. Is the ecosystem service concept improving impact assessment? Evidence from recent international practice

    SciTech Connect (OSTI)

    Rosa, Josianne Claudia Sales Sánchez, Luis E.

    2015-01-15

    Considering ecosystem services (ES) could foster innovation and improve environmental and social impact assessment (ESIA) practice, but is the potential being fulfilled? In order to investigate how ES have been treated in recent international practice, three questions are asked: (i) were the tasks of an ES analysis carried out? (ii) how is such analysis integrated with other analysis presented in the ESIA? (iii) does ES analysis result in additional or improved mitigation or enhancement measures? These research questions were unfolded into 15 auxiliary questions for reviewing five ESIA reports prepared for mining, hydroelectric and transportation infrastructure projects in Africa, Asia and South America. All cases incorporated ES into ESIA to meet a requirement of the International Finance Corporation's Performance Standards on Environmental and Social Sustainability. It was found that: (i) in only three cases most tasks recommended by current guidance were adopted (ii) all reports feature a dedicated ES chapter or section, but in three of them no evidence was found that the ES analysis was integrated within impact assessment (iii) in the two ESIAs that followed guidance, ES analysis resulted in specific mitigation measures. Few evidence was found that the ES concept is improving current ESIA practice. Key challenges are: (i) integrating ES analysis in such a way that it does not duplicate other analysis; (ii) adequately characterizing the beneficiaries of ES; and (iii) quantifying ES supply for impact prediction. - Highlights: • Incorporating ecosystem services analysis in impact assessment can improve results. • Additional impacts and mitigation were identified. • Challenges include developing appropriate indicators for impact prediction. • A key challenge is integrating the concept in such a way that it does not duplicate other analysis.

  20. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    SciTech Connect (OSTI)

    Li, Wei Xie, Yuanbo Hao, Fanghua

    2014-04-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development 10% compared with the most intense development alternative and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision-making structures in China. It offers the potential for delivering timely and quality results to decision-making processes. To achieve the desired efficiency, it is recommended that an SEA procedure take into account findings acquired from an improved RIAM application at an early stage, then, at a later stage, results from more comprehensive assessments conducted using more sophisticated methods should be added, if time and data are available. - Highlights: RIAM is a potential SEA tool due to its multidisciplinary setting and rapid process. Weighting index and computing IES are raised for improving RIAM when applied to SEAs. The improved RIAM boosts SEA effectiveness by timely responding to decision-making. The improved RIAM is more suitable to an SEA bothered by tight time or data shortage. The improved RIAM adapts to the technical aims of SEA and decision features in China.

  1. Assessing cumulative impacts within state environmental review frameworks in the United States

    SciTech Connect (OSTI)

    Ma Zhao; Becker, Dennis R.; Kilgore, Michael A.

    2009-11-15

    Cumulative impact assessment (CIA) is the process of systematically assessing a proposed action's cumulative environmental effects in the context of past, present, and future actions, regardless of who undertakes such actions. Previous studies have examined CIA efforts at the federal level but little is known about how states assess the cumulative impacts of nonfederal projects. By examining state environmental review statutes, administrative rules, agency-prepared materials, and a national survey of the administrators of state environmental review programs, this study identifies the legal and administrative frameworks for CIA. It examines current CIA practice, discusses the relationship between CIA policy and its implementation, and explores the opportunities for improvement. The results of the study show that twenty-nine state environmental review programs across twenty-six states required the assessment of cumulative environmental impacts. More than half of these programs have adopted specific procedures for implementing their policies. Some programs assessed cumulative impacts using a standard review document, and others have created their own documentations incorporated into applications for state permits or funding. The majority of programs have adopted various scales, baselines, significance criteria, and coordination practices in their CIA processes. Mixed methods were generally used for data collection and analysis; qualitative methods were more prevalent than quantitative methods. The results also suggest that a program with comprehensive and consistent environmental review policies and procedures does not always imply extensive CIA requirements and practices. Finally, this study discusses the potential for improving existing CIA processes and promoting CIA efforts in states without established environmental review programs.

  2. Assessing the Energy Impact of Connected and Automated Vehicle (CAV) Technologies (Presentation), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessing the Energy Impact of Connected and Automated Vehicle (CAV) Technologies SAE 2016 Government/Industry Meeting January 21, 2016 Jeff Gonder, Yuche Chen, Mike Lammert, Eric Wood Transportation and Hydrogen Systems Center (THSC) National Renewable Energy Laboratory (NREL) NREL/PR-5400-65743 2 Outline * Overall energy impact assessment * Example feature-level impacts * Real-world/off-cycle benefit calculation * On-going work by DOE and its national labs 3 "Bookending" CAV Energy

  3. Should different impact assessment instruments be integrated? Evidence from English spatial planning

    SciTech Connect (OSTI)

    Tajima, Ryo; Fischer, Thomas B.

    2013-07-15

    This paper aims at providing empirical evidence to the question as to whether integration of different instruments is achieving its aim in supporting sustainable decision making, focusing on SEA inclusive sustainability appraisal (SA) and other impact assessments (IAs) currently used in English spatial planning. Usage of IAs in addition to SA is established and an analysis of the integration approach (in terms of process, output, and assessor) as well as its effectiveness is conducted. It is found that while integration enhances effectiveness to some extent, too much integration, especially in terms of the procedural element, appears to diminish the overall effectiveness of each IA in influencing decisions as they become captured by the balancing function of SA. -- Highlights: ? The usage of different impact assessments in English spatial planning is clarified. ? The relationship between integration approach and effectiveness is analyzed. ? Results suggest that integration does not necessarily lead to more sustainable decisions. ? Careful consideration is recommended upon process integration.

  4. Environmental impact assessment in Colombia: Critical analysis and proposals for improvement

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Zamorano, Montserrat

    2010-07-15

    The evaluation of Environmental Impact Assessment (EIA) systems is a highly recommended strategy for enhancing their effectiveness and quality. This paper describes an evaluation of EIA in Colombia, using the model and the control mechanisms proposed and applied in other countries by Christopher Wood and Ortolano. The evaluation criteria used are based on Principles of Environmental Impact Assessment Best Practice, such as effectiveness and control features, and they were contrasted with the opinions of a panel of Colombian EIA experts as a means of validating the results of the study. The results found that EIA regulations in Colombia were ineffective because of limited scope, inadequate administrative support and the inexistence of effective control mechanisms and public participation. This analysis resulted in a series of recommendations regarding the further development of the EIA system in Colombia with a view to improving its quality and effectiveness.

  5. Assessing the impacts of the Surface Mining Control and Reclamation Act

    SciTech Connect (OSTI)

    Desai, U.

    1989-01-01

    Even a dozen years since the passage of the Surface Mining Control and Reclamation Act (SMCRA) there is little agreement on how well it has worked. The paper attempts to assess the impacts of SMCRA in six major surface coal producing states. Although it is not possible to make an unqualified overall national assessment, the evidence presented in the paper indicates that in many (but by no means all) cases, surface coal mining is now carried out in environmentally less destructive ways then before the Act. However, the accomplishments have fallen far short of expectations. The situation in some states has gotten worse than before the Act. Overall, the impact of the Act on the ground has been mixed and has depended on the rigor with which the Act has been implemented in individual coal states.

  6. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    SciTech Connect (OSTI)

    Schweitzer, M.; Saulsbury, J.W. ); Schexnayder, S.M. )

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure.

  7. The need for health impact assessment in China: Potential benefits for public health and steps forward

    SciTech Connect (OSTI)

    Wu Liming; Rutherford, Shannon; Chu, Cordia

    2011-07-15

    Health impact assessment (HIA) is a useful tool to predict and estimate the potential health impact associated with programs, projects, and policies by comprehensively identifying relevant health determinants and their consequences. China is undergoing massive and rapid socio-economic changes leading to environment and population health challenges such as a large increase in non-communicable diseases, the emergence and re-emergence of infectious diseases, new health risks associated with environmental pollutants and escalating health inequality. These health issues are affected by multiple determinants which can be influenced by planned policies, programs, and projects. This paper discusses the needs for health impact assessment in China in order to minimize the negative health consequences from projects, programs and policies associated with rapid social and economic development. It first describes the scope of China's current impact assessment system and points out its inadequacy in meeting the requirements of population health protection and promotion. It then analyses the potential use of HIA and why China needs to develop and apply HIA as a tool to identify potential health impacts of proposed programs, projects and policies so as to influence decision-making early in the planning process. Thus, the paper recommends the development of HIA as a useful tool in China to enhance decision-making for the protection and promotion of population health. For this to happen, the paper outlines steps necessary for the establishment and successful implementation of HIA in China: beginning with the establishment of a HIA framework, followed by workforce capacity building, methodology design, and intersectoral collaboration and stakeholder engagement.

  8. Methodology for the Assessment of the Macroeconomic Impacts of Stricter CAFE Standards - Addendum

    Reports and Publications (EIA)

    2002-01-01

    This assessment of the economic impacts of Corporate Average Fuel Economy (CAFÉ) standards marks the first time the Energy Information Administration has used the new direct linkage of the DRI-WEFA Macroeconomic Model to the National Energy Modeling System (NEMS) in a policy setting. This methodology assures an internally consistent solution between the energy market concepts forecast by NEMS and the aggregate economy as forecast by the DRI-WEFA Macroeconomic Model of the U.S. Economy.

  9. Assessment of Future Vehicle Transportation Options and Their Impact on the Electric Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Future Vehicle Transportation Options and Their Impact on the Electric Grid January 10, 2011 DOE/NETL-2010/1466 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,

  10. Privacy Impact Assessment | OSTI, US Dept of Energy, Office of Scientific

    Office of Scientific and Technical Information (OSTI)

    and Technical Information Privacy Impact Assessment Name of Project: Web Domains Maintained by the Office of Scientific and Technical Information (OSTI) Bureau: U.S. Department of Energy, Office of Science Project's Unique ID: N/A Contact Information: [Mailing address for 1 through 5 below is: DOE Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831.] Who is the person completing this document? (Name, title, organization, and contact information.) Valerie S.

  11. Assessing climate impacts of planning policies-An estimation for the urban region of Leipzig (Germany)

    SciTech Connect (OSTI)

    Schwarz, Nina Bauer, Annette Haase, Dagmar

    2011-03-15

    Local climate regulation by urban green areas is an important urban ecosystem service, as it reduces the extent of the urban heat island and therefore enhances quality of life. Local and regional planning policies can control land use changes in an urban region, which in turn alter local climate regulation. Thus, this paper describes a method for estimating the impacts of current land uses as well as local and regional planning policies on local climate regulation, using evapotranspiration and land surface emissivity as indicators. This method can be used by practitioners to evaluate their policies. An application of this method is demonstrated for the case study Leipzig (Germany). Results for six selected planning policies in Leipzig indicate their distinct impacts on climate regulation and especially the role of their spatial extent. The proposed method was found to easily produce a qualitative assessment of impacts of planning policies on climate regulation.

  12. Assessing Impacts of Climate Change on Forests: The State of Biological Modeling

    DOE R&D Accomplishments [OSTI]

    Dale, V. H.; Rauscher, H. M.

    1993-04-06

    Models that address the impacts to forests of climate change are reviewed by four levels of biological organization: global, regional or landscape, community, and tree. The models are compared as to their ability to assess changes in greenhouse gas flux, land use, maps of forest type or species composition, forest resource productivity, forest health, biodiversity, and wildlife habitat. No one model can address all of these impacts, but landscape transition models and regional vegetation and land-use models consider the largest number of impacts. Developing landscape vegetation dynamics models of functional groups is suggested as a means to integrate the theory of both landscape ecology and individual tree responses to climate change. Risk assessment methodologies can be adapted to deal with the impacts of climate change at various spatial and temporal scales. Four areas of research development are identified: (1) linking socioeconomic and ecologic models, (2) interfacing forest models at different scales, (3) obtaining data on susceptibility of trees and forest to changes in climate and disturbance regimes, and (4) relating information from different scales.

  13. Accounting for uncertainty and risk in assessments of impacts for offshore oil and gas leasing proposals

    SciTech Connect (OSTI)

    Wildermann, R.; Beittel, R. )

    1993-01-01

    The Minerals Management Service (MMS) of the US Department of the Interior prepares an environmental impact statement (EIS) for each proposal to lease a portion of the Outer Continental Shelf (OCS) for oil and gas exploration and development. The nature, magnitude, and timing of the activities that would ultimately result from leasing are subject to wide speculation, primarily because of uncertainties about the locations and amounts of petroleum hydrocarbons that exist on most potential leases. These uncertainties create challenges in preparing EIS's that meet National Environmental Policy Act requirements and provide information useful to decision-makers. This paper examines the constraints that uncertainty places on the detail and reliability of assessments of impacts from potential OCS development. It further describes how the MMS accounts for uncertainty in developing reasonable scenarios of future events that can be evaluated in the EIS. A process for incorporating the risk of accidental oil spills into assessments of expected impacts is also presented. Finally, the paper demonstrates through examination of case studies how a balance can be achieved between the need for an EIS to present impacts in sufficient detail to allow a meaningful comparison of alternatives and the tendency to push the analysis beyond credible limits.

  14. Strengthening the link between project planning and environmental impact assessment : the assembled chemical weapons assessment dialogue process.

    SciTech Connect (OSTI)

    Goldberg, M. S.; Environmental Assessment

    2003-01-01

    An approach to stakeholder involvement known as the Dialogue process has been an integral part of the US Department of Defense Assembled Chemical Weapons Assessment (ACWA) Program from its inception. It has provided a means of soliciting stakeholder input before key decisions are made. The projects developed under the ACWA Program are characterized as major federal actions and therefore also must meet the requirements of the National Environmental Policy Act (NEPA). One of these is the requirement for public participation in the environmental impact assessment process. This case study describes the ACWA Dialogue and NEPA processes, and examines their relationship in the implementation of the ACWA Program. The examination suggests that involving the public at the beginning of a program through a Dialogue-like process can introduce environmental considerations early in the project development process and contribute to the development of a more informed public. These factors improve the overall efficacy of public participation, strengthening the link between project development and environmental assessment in a manner consistent with the original intent of NEPA.

  15. Assessing the state-level consequences of global warming: Socio-economic and energy demand impacts

    SciTech Connect (OSTI)

    Rubin, B.M. Gailmard, S.; Marsh, D.; Septoff, A.

    1996-12-31

    The large body of research on climate change has begun to recognize a significant deficiency: the lack of analysis of the impact of climate change at a spatial level consistent with the anticipated occurrence of climate change. Climate change is likely to vary by region, while impact analysis has focused on much larger political units. Clearly, adaptation/mitigation strategies must be developed at a level consistent with political and policy-making processes. This paper specifically addresses this deficiency by identifying the potential socio-economic and energy demand consequences of climate change for subnational regions. This is accomplished via the development and application of a regional simultaneous equation, econometric simulation model that focuses on five states (Illinois, Indiana, Michigan, Ohio, and Wisconsin) in the Great Lakes region of the US. This paper presents a process for obtaining state-specific assessments of the consequences of climate change for the socio-economic system. As such, it provides an indication of which economic sectors are most sensitive to climate change for a specific state (Indiana), a set of initial mitigation/adaptation strategies for this state, and the results of testing these strategies in the policy analysis framework enabled by the model. In addition, the research demonstrates an effective methodology for assessing impacts and policy implications of climate change at a level consistent with policy making authority.

  16. Role of slope stability in cumulative impact assessment of hydropower development: North Cascades, Washington

    SciTech Connect (OSTI)

    Lee, R.R.; Staub, W.P.

    1993-08-01

    Two environmental assessments considered the potential cumulative environmental impacts resulting from the development of eight proposed hydropower projects in the Nooksack River Basin and 11 proposed projects in the Skagit River Basin, North Cascades, Washington, respectively. While not identified as a target resource, slope stability and the alteration of sediment supply to creeks and river mainstems significantly affect other resources. The slope stability assessment emphasized the potential for cumulative impacts under disturbed conditions (e.g., road construction and timber harvesting) and a landslide-induced pipeline rupture scenario. In the case of small-scale slides, the sluicing action of ruptured pipeline water on the fresh landslide scarp was found to be capable of eroding significantly more material than the original landslide. For large-scale landslides, sluiced material was found to be a small increment of the original landslide. These results predicted that hypothetical accidental pipeline rupture by small-scale landslides may result in potential cumulative impacts for 12 of the 19 projects with pending license applications in both river basins. 5 refs., 2 tabs.

  17. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    SciTech Connect (OSTI)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-07-15

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  18. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    SciTech Connect (OSTI)

    N /A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  19. U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS

    Office of Environmental Management (EM)

    ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS STATUS CHART Office of NEPA Policy and Compliance 202-586-4600 1-800-472-2756 (leave message) This chart represents anticipated activity and is not a commitment for documentation or dates. This chart is available on the DOE NEPA Web site at energy.gov/NEPA Report Date: 2/16/2016 Total Actions Total Actions * Shaded entries are NEPA reviews completed (e.g., ROD signed, EA/FONSI distributed) or canceled since the last report was issued.

  20. U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS

    Energy Savers [EERE]

    ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS STATUS CHART Office of NEPA Policy and Compliance 202-586-4600 1-800-472-2756 (leave message) Report Date: 3/16/2016 This chart represents anticipated activity and is not a commitment for documentation or dates. This chart is available on the DOE NEPA Web site at energy.gov/NEPA Total Actions Total Actions * Shaded entries are NEPA reviews completed (e.g., ROD signed, EA/FONSI distributed) or canceled since the last report was issued.

  1. Project Impact Assessments … Building America FY14 Field Test Technical Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Assessments - Building America FY14 Field Test Technical Support 2014 Building Technologies Office Peer Review Lieko Earle, lieko.earle@nrel.gov NREL Project Summary Timeline: Key Partners: Start date: 10/1/2013 Planned end date: 9/30/2014 Key Milestones : 1. Launch Field Test Best Practices web- based facilitated discussion forum (6/30/2014) 2. Summary of Indoor Temperature Datasets (9/30/2014) Budget: Total DOE $ to date: $425k Total future DOE $: TBD Target Market/Audience: NREL͛s

  2. Framework for assessing impacts of pile-driving noise from offshore wind farm construction on a harbour seal population

    SciTech Connect (OSTI)

    Thompson, Paul M.; Hastie, Gordon D.; Nedwell, Jeremy; Barham, Richard; Brookes, Kate L.; Cordes, Line S.; Bailey, Helen; McLean, Nancy

    2013-11-15

    Offshore wind farm developments may impact protected marine mammal populations, requiring appropriate assessment under the EU Habitats Directive. We describe a framework developed to assess population level impacts of disturbance from piling noise on a protected harbour seal population in the vicinity of proposed wind farm developments in NE Scotland. Spatial patterns of seal distribution and received noise levels are integrated with available data on the potential impacts of noise to predict how many individuals are displaced or experience auditory injury. Expert judgement is used to link these impacts to changes in vital rates and applied to population models that compare population changes under baseline and construction scenarios over a 25 year period. We use published data and hypothetical piling scenarios to illustrate how the assessment framework has been used to support environmental assessments, explore the sensitivity of the framework to key assumptions, and discuss its potential application to other populations of marine mammals. -- Highlights: We develop a framework to support Appropriate Assessment for harbour seal populations. We assessed potential impacts of wind farm construction noise. Data on distribution of seals and noise were used to predict effects on individuals. Expert judgement linked these impacts to vital rates to model population change. We explore the sensitivity of the framework to key assumptions and uncertainties.

  3. Improving the Assessment and Valuation of Climate Change Impacts for Policy and Regulatory Analysis

    SciTech Connect (OSTI)

    Marten, Alex; Kopp, Robert E.; Shouse, Kate C.; Griffiths, Charles; Hodson, Elke L.; Kopits, Elizabeth; Mignone, Bryan K.; Moore, Chris; Newbold, Steve; Waldhoff, Stephanie T.; Wolverton, Ann

    2013-04-01

    The social cost of carbon (SCC) is a monetized metric for evaluating the benefits associated with marginal reductions in carbon dioxide (CO2) emissions. It represents the expected welfare loss from the future damages caused by the release of one tonne of CO2 in a given year, expressed in consumption equivalent terms. It is intended to be a comprehensive measure, taking into account changes in agricultural productivity, human health risks, loss of ecosystem services and biodiversity, and the frequency and severity of flooding and storms, among other possible impacts. Estimating the SCC requires long-term modeling of global economic activity, the climate system, and the linkages between the two through anthropogenic greenhouse gas (GHG) emissions and the effects of changing climatic conditions on economic activity and human well-being. The United States government currently uses the SCC in regulatory benefit-cost analyses to assess the welfare effects of changes in CO2 emissions. Consistent application of the SCC to federal rulemaking analyses began in 2009-2010 with the development of a set of global SCC estimates that employed three prominent integrated assessment models (IAMs) -- DICE, FUND, and PAGE. The U.S. government report identified a number of limitations associated with SCC estimates in general and its own assumptions in particular: an incomplete treatment of damages, including potential “catastrophic” impacts; uncertainty regarding the extrapolation of damage functions to high temperatures; incomplete treatment of adaptation and technological change; and the evaluation of uncertain outcomes in a risk-neutral fashion. External experts have identified other potential issues, including how best to model long-term socio-economic and emissions pathways, oversimplified physical climate and carbon cycle modeling within the IAMs, and an inconsistency between non-constant economic growth scenarios and constant discount rates. The U.S. government has committed to updating the estimates regularly as modeling capabilities and scientific and economic knowledge improves. To help foster further improvements in estimating the SCC, the U.S. Environmental Protection Agency and the U.S. Department of Energy hosted a pair of workshops on “Improving the Assessment and Valuation of Climate Change Impacts for Policy and Regulatory Analysis.” The first focused on conceptual and methodological issues related to integrated assessment modeling and the second brought together natural and social scientists to explore methods for improving damage assessment for multiple sectors. These two workshops provide the basis for the 13 papers in this special issue.

  4. The role of Health Impact Assessment in the setting of air quality standards: An Australian perspective

    SciTech Connect (OSTI)

    Spickett, Jeffery; Faculty of Health Sciences, School of Public Health, Curtin University, Perth, Western Australia ; Katscherian, Dianne; Faculty of Health Sciences, School of Public Health, Curtin University, Perth, Western Australia ; Harris, Patrick

    2013-11-15

    The approaches used for setting or reviewing air quality standards vary from country to country. The purpose of this research was to consider the potential to improve decision-making through integration of HIA into the processes to review and set air quality standards used in Australia. To assess the value of HIA in this policy process, its strengths and weaknesses were evaluated aligned with review of international processes for setting air quality standards. Air quality standard setting programmes elsewhere have either used HIA or have amalgamated and incorporated factors normally found within HIA frameworks. They clearly demonstrate the value of a formalised HIA process for setting air quality standards in Australia. The following elements should be taken into consideration when using HIA in standard setting. (a) The adequacy of a mainly technical approach in current standard setting procedures to consider social determinants of health. (b) The importance of risk assessment criteria and information within the HIA process. The assessment of risk should consider equity, the distribution of variations in air quality in different locations and the potential impacts on health. (c) The uncertainties in extrapolating evidence from one population to another or to subpopulations, especially the more vulnerable, due to differing environmental factors and population variables. (d) The significance of communication with all potential stakeholders on issues associated with the management of air quality. In Australia there is also an opportunity for HIA to be used in conjunction with the NEPM to develop local air quality standard measures. The outcomes of this research indicated that the use of HIA for air quality standard setting at the national and local levels would prove advantageous. -- Highlights: Health Impact Assessment framework has been applied to a policy development process. HIA process was evaluated for application in air quality standard setting. Advantages of HIA in the air quality standard setting process are demonstrated.

  5. Till'"

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    zg-..Ttr""2t.T ? f~'***( .)'~=.~ -*pnw**-*:*** .~~., '"?""(".~, .. -.-. **r='''' Till'" a * PRIVACY IMPACT ASSESSMENT: INL ATR NSUF Users Week 2009 PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA:

  6. A long-term, integrated impact assessment of alternative building energy code scenarios in China

    SciTech Connect (OSTI)

    Yu, Sha; Eom, Jiyong; Evans, Meredydd; Clarke, Leon E.

    2014-04-01

    China is the second largest building energy user in the world, ranking first and third in residential and commercial energy consumption. Beginning in the early 1980s, the Chinese government has developed a variety of building energy codes to improve building energy efficiency and reduce total energy demand. This paper studies the impact of building energy codes on energy use and CO2 emissions by using a detailed building energy model that represents four distinct climate zones each with three building types, nested in a long-term integrated assessment framework GCAM. An advanced building stock module, coupled with the building energy model, is developed to reflect the characteristics of future building stock and its interaction with the development of building energy codes in China. This paper also evaluates the impacts of building codes on building energy demand in the presence of economy-wide carbon policy. We find that building energy codes would reduce Chinese building energy use by 13% - 22% depending on building code scenarios, with a similar effect preserved even under the carbon policy. The impact of building energy codes shows regional and sectoral variation due to regionally differentiated responses of heating and cooling services to shell efficiency improvement.

  7. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    SciTech Connect (OSTI)

    Goff, S.J.

    2000-05-28

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide is a good start for providing the geothermal community a standard EIA format. As decision makers may only read the Executive Summary of the EIA, this summary should be well written and present the significant impacts (in order of importance), clarifying which are unavoidable and which are irreversible; the measures which can be taken to mitigate them; the cumulative effects of impacts; and the requirements for monitoring and supervision. Quality plans and Public Participation plans should also be included as part of the environmental analysis process.

  8. A Hydro-Economic Approach to Representing Water Resources Impacts in Integrated Assessment Models

    SciTech Connect (OSTI)

    Kirshen, Paul H.; Strzepek, Kenneth, M.

    2004-01-14

    Grant Number DE-FG02-98ER62665 Office of Energy Research of the U.S. Department of Energy Abstract Many Integrated Assessment Models (IAM) divide the world into a small number of highly aggregated regions. Non-OECD countries are aggregated geographically into continental and multiple-continental regions or economically by development level. Current research suggests that these large scale aggregations cannot accurately represent potential water resources-related climate change impacts. In addition, IAMs do not explicitly model the flow regulation impacts of reservoir and ground water systems, the economics of water supply, or the demand for water in economic activities. Using the International Model for Policy Analysis of Agricultural Commodities and Trade (IMPACT) model of the International Food Policy Research Institute (IFPRI) as a case study, this research implemented a set of methodologies to provide accurate representation of water resource climate change impacts in Integrated Assessment Models. There were also detailed examinations of key issues related to aggregated modeling including: modeling water consumption versus water withdrawals; ground and surface water interactions; development of reservoir cost curves; modeling of surface areas of aggregated reservoirs for estimating evaporation losses; and evaluating the importance of spatial scale in river basin modeling. The major findings include: - Continental or national or even large scale river basin aggregation of water supplies and demands do not accurately capture the impacts of climate change in the water and agricultural sector in IAMs. - Fortunately, there now exist gridden approaches (0.5 X 0.5 degrees) to model streamflows in a global analysis. The gridded approach to hydrologic modeling allows flexibility in aligning basin boundaries with national boundaries. This combined with GIS tools, high speed computers, and the growing availability of socio-economic gridded data bases allows assignment of demands to river basins to create hydro-economic zones that respect as much as possible both political and hydrologic integrity in different models. - To minimize pre-processing of data and add increased flexibility to modeling water resources and uses, it is recommended that water withdrawal demands be modeled, not consumptive requirements even though this makes the IAM more complex. - IAMs must consider changes in water availability for irrigation under climate change; ignoring them is more inaccurate than ignoring yield changes in crops under climate change. - Determining water availability and cost in river basins must include modeling streamflows, reservoirs and their operations, and ground water and its interaction with surface water. - Scale issues are important. The results from condensing demands and supplies in a large complex river basin to one node can be misleading for all uses under low flow conditions and instream flow uses under all conditions. Monthly is generally the most accurate scale for modeling river flows and demands. Challenges remain in integrating hydrologic units with political boundaries but the gridded approach to hydrologic modeling allows flexibility in aligning basin boundaries with political boundaries. - Using minimal reservoir cost data, it is possible to use basin topography to estimate reservoir storage costs. - Reservoir evaporation must be considered when assessing the usable water in a watershed. Several methods are available to estimate the relationship between aggregated storage surface area and storage volume. - For existing or future IAMs that can not use the appropriate aggregation for water, a water preprocessor may be required due the finer scale of hydrologic impacts.

  9. Environmental impact assessment in the Philippines: Progress, problems, and directions for the future

    SciTech Connect (OSTI)

    Ross, W.A. )

    1994-07-01

    The environmental impact statement (EIS) system of the Philippines is reviewed, identifying progress made in its effective implementation since 1986. Improvement in coverage is noted and real commitment to good environmental impact assessment (EIA) practice is found in those responsible for the EIS system. Project proponents show a modest acceptance of the system. Major problems remaining are: (1) the EIS system is seen as a bureaucratic requirement needed to obtain project approvals; (2) political interference determines the outcome of some environmental reviews; (3) questionable practices by public servants serve to discredit the system; and (4) the treatment of projects in environmentally critical areas is less than satisfactory. Based on the principle that it is essential to establish a credible process seen to work effectively by the public, politicians, the government bureaucracy, and proponents, suggestions for improvement are made. They deal with the treatment of EISs for projects already under construction, EIA training courses, and simple adjustments to the EIS system to focus it on the most important projects.

  10. Participatory health impact assessment for the development of local government regulation on hazard control

    SciTech Connect (OSTI)

    Inmuong, Uraiwan; Rithmak, Panee; Srisookwatana, Soomol; Traithin, Nathathai; Maisuporn, Pornpun

    2011-07-15

    The Thai Public Health Act 1992 required the Thai local governments to issue respective regulations to take control of any possible health-hazard related activities, both from commercial and noncommercial sources. Since 1999, there has been centrally decentralized of power to a new form of local government establishment, namely Sub-district Administrative Organization (SAO). The SAO is asmall-scale local governing structure while its legitimate function is for community services, including control of health impact related activities. Most elected SAO administrators and officers are new and less experience with any of public health code of practice, particularly on health-hazard control. This action research attempted to introduce and apply a participatory health impact assessment (HIA) tool for the development of SAO health-hazard control regulation. The study sites were at Ban Meang and Kok See SAOs, Khon Kaen Province, Thailand, while all intervention activities conducted during May 2005-April 2006. A set of cooperative activities between researchers and community representatives were planned and organized by; surveying and identifying place and service base locally causing local environmental health problems, organizing community participatory workshops for drafting and proposing the health-hazard control regulation, and appropriate practices for health-hazard controlling measures. This action research eventually could successfully enable the SAO administrators and officers understanding of local environmental-related health problem, as well as development of imposed health-hazard control regulation for local community.

  11. ASSESSMENT OF THE IMPACT OF TOA PARTITIONING ON DWPF MELTER OFF-GAS FLAMMABILITY

    SciTech Connect (OSTI)

    Daniel, G.

    2013-06-18

    An assessment has been made to evaluate the impact on the DWPF melter off-gas flammability of increasing the amount of TOA in the current solvent used in the Modular Caustic-Side Solvent Extraction Process Unit (MCU) process. The results of this study showed that the concentrations of nonvolatile carbon of the current solvent limit (150 ppm) in the Slurry Mix Evaporator (SME) product would be about 7% higher and the nonvolatile hydrogen would be 2% higher than the actual current solvent (126 ppm) with an addition of up to 3 ppm of TOA when the concentration of Isopar L in the effluent transfer is controlled below 87 ppm and the volume of MCU effluent transfer to DWPF is limited to 15,000 gallons per Sludge Receipt and Adjustment Tank (SRAT)/SME cycle. Therefore, the DWPF melter off-gas flammability assessment is conservative for up to an additional 3 ppm of TOA in the effluent based on these assumptions. This report documents the calculations performed to reach this conclusion.

  12. The Arctic as a test case for an assessment of climate impacts on national security.

    SciTech Connect (OSTI)

    Taylor, Mark A.; Zak, Bernard Daniel; Backus, George A.; Ivey, Mark D.; Boslough, Mark Bruce Elrick

    2008-11-01

    The Arctic region is rapidly changing in a way that will affect the rest of the world. Parts of Alaska, western Canada, and Siberia are currently warming at twice the global rate. This warming trend is accelerating permafrost deterioration, coastal erosion, snow and ice loss, and other changes that are a direct consequence of climate change. Climatologists have long understood that changes in the Arctic would be faster and more intense than elsewhere on the planet, but the degree and speed of the changes were underestimated compared to recent observations. Policy makers have not yet had time to examine the latest evidence or appreciate the nature of the consequences. Thus, the abruptness and severity of an unfolding Arctic climate crisis has not been incorporated into long-range planning. The purpose of this report is to briefly review the physical basis for global climate change and Arctic amplification, summarize the ongoing observations, discuss the potential consequences, explain the need for an objective risk assessment, develop scenarios for future change, review existing modeling capabilities and the need for better regional models, and finally to make recommendations for Sandia's future role in preparing our leaders to deal with impacts of Arctic climate change on national security. Accurate and credible regional-scale climate models are still several years in the future, and those models are essential for estimating climate impacts around the globe. This study demonstrates how a scenario-based method may be used to give insights into climate impacts on a regional scale and possible mitigation. Because of our experience in the Arctic and widespread recognition of the Arctic's importance in the Earth climate system we chose the Arctic as a test case for an assessment of climate impacts on national security. Sandia can make a swift and significant contribution by applying modeling and simulation tools with internal collaborations as well as with outside organizations. Because changes in the Arctic environment are happening so rapidly, a successful program will be one that can adapt very quickly to new information as it becomes available, and can provide decision makers with projections on the 1-5 year time scale over which the most disruptive, high-consequence changes are likely to occur. The greatest short-term impact would be to initiate exploratory simulations to discover new emergent and robust phenomena associated with one or more of the following changing systems: Arctic hydrological cycle, sea ice extent, ocean and atmospheric circulation, permafrost deterioration, carbon mobilization, Greenland ice sheet stability, and coastal erosion. Sandia can also contribute to new technology solutions for improved observations in the Arctic, which is currently a data-sparse region. Sensitivity analyses have the potential to identify thresholds which would enable the collaborative development of 'early warning' sensor systems to seek predicted phenomena that might be precursory to major, high-consequence changes. Much of this work will require improved regional climate models and advanced computing capabilities. Socio-economic modeling tools can help define human and national security consequences. Formal uncertainty quantification must be an integral part of any results that emerge from this work.

  13. Cumulative hydrologic impact assessments on surface-water in northeastern Wyoming using HEC-1; a pilot study

    SciTech Connect (OSTI)

    Anderson, A.J.; Eastwood, D.C.; Anderson, M.E.

    1997-12-31

    The Surface Mining Control and Reclamation Act of 1977 requires that areas in which multiple mines will affect one watershed be analyzed and the cumulative impacts of all mining on the watershed be assessed. The purpose of the subject study was to conduct a cumulative hydrologic impact assessment (CHIA) for surface-water on a watershed in northeastern Wyoming that is currently being impacted by three mines. An assessment of the mining impact`s affect on the total discharge of the watershed is required to determine whether or not material damage to downstream water rights is likely to occur as a result of surface mining and reclamation. The surface-water model HEC-1 was used to model four separate rainfall-runoff events that occurred in the study basin over three years (1978-1980). Although these storms were used to represent pre-mining conditions, they occurred during the early stages of mining and the models were adjusted accordingly. The events were selected for completeness of record and antecedent moisture conditions (AMC). Models were calibrated to the study events and model inputs were altered to reflect post-mining conditions. The same events were then analyzed with the new model inputs. The results were compared with the pre-mining calibration. Peak flow, total discharge and timing of flows were compared for pre-mining and post-mining models. Data were turned over to the State of Wyoming for assessment of whether material damage to downstream water rights is likely to occur.

  14. Assessing Development Impacts Associated with Low Emission Development Strategies: Lessons Learned from Pilot Efforts in Kenya and Montenegro

    SciTech Connect (OSTI)

    Cox, S.; Katz, J.; Wurtenberger, L.

    2014-01-01

    Low emission development strategies (LEDS) articulate economy-wide policies and implementation plans designed to enable a country to meet its long-term development objectives while reducing greenhouse gas emissions. A development impact assessment tool was developed to inform an analytically robust and transparent prioritization of LEDS actions based on their economic, social, and environmental impacts. The graphical tool helps policymakers communicate the development impacts of LEDS options and identify actions that help meet both emissions reduction and development goals. This paper summarizes the adaptation and piloting of the tool in Kenya and Montenegro. The paper highlights strengths of the tool and discusses key needs for improving it.

  15. Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

    SciTech Connect (OSTI)

    Carmichael, Laurence; Barton, Hugh; Gray, Selena; Lease, Helen; Pilkington, Paul

    2012-01-15

    This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have and their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: Black-Right-Pointing-Pointer Governance and policy barriers and facilitators to the integration of health into urban planning. Black-Right-Pointing-Pointer Review of literature on impact assessment methods used across the world. Black-Right-Pointing-Pointer Knowledge, partnerships, management/resources and processes can impede integration. Black-Right-Pointing-Pointer HIA evaluations prevail uncovering research opportunities for evaluating other techniques.

  16. DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory

    Broader source: Energy.gov [DOE]

    DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory

  17. Assessment of the impact of the next generation solvent on DWPF melter off-gas flammability

    SciTech Connect (OSTI)

    Daniel, W. E.

    2013-02-13

    An assessment has been made to evaluate the impact on the DWPF melter off-gas flammability of replacing the current solvent used in the Modular Caustic-Side Solvent Extraction Process Unit (MCU) process with the Next Generation Solvent (NGS-MCU) and blended solvent. The results of this study showed that the concentrations of nonvolatile carbon and hydrogen of the current solvent in the Slurry Mix Evaporator (SME) product would both be about 29% higher than their counterparts of the NGS-MCU and blended solvent in the absence of guanidine partitioning. When 6 ppm of guanidine (TiDG) was added to the effluent transfer to DWPF to simulate partitioning for the NGS-MCU and blended solvent cases and the concentration of Isopar{reg_sign} L in the effluent transfer was controlled below 87 ppm, the concentrations of nonvolatile carbon and hydrogen of the NGS-MCU and blended solvent were still about 12% and 4% lower, respectively, than those of the current solvent. It is, therefore, concluded that as long as the volume of MCU effluent transfer to DWPF is limited to 15,000 gallons per Sludge Receipt and Adjustment Tank (SRAT)/SME cycle and the concentration of Isopar{reg_sign} L in the effluent transfer is controlled below 87 ppm, using the current solvent assumption of 105 ppm Isopar{reg_sign} L or 150 ppm solvent in lieu of NGS-MCU or blended solvent in the DWPF melter off-gas flammability assessment is conservative for up to an additional 6 ppm of TiDG in the effluent due to guanidine partitioning. This report documents the calculations performed to reach this conclusion.

  18. Nuclear Risk Assessment for the Mars 2020 Mission Environmental Impact Statement

    SciTech Connect (OSTI)

    Clayton, Daniel J.; Bignell, John; Jones, Christopher A.; Rohe, Daniel P.; Flores, Gregg J.; Bartel, Timothy J.; Gelbard, Fred; Le, San; Morrow, Charles W.; Potter, Donald L.; Young, Larry W.; Bixler, Nathan E.; Lipinski, Ronald J.

    2014-01-01

    In the summer of 2020, the National Aeronautics and Space Administration (NASA) plans to launch a spacecraft as part of the Mars 2020 mission. One option for the rover on the proposed spacecraft uses a Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) to provide continuous electrical and thermal power for the mission. An alternative option being considered is a set of solar panels for electrical power with up to 80 Light-Weight Radioisotope Heater Units (LWRHUs) for local component heating. Both the MMRTG and the LWRHUs use radioactive plutonium dioxide. NASA is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act. The EIS will include information on the risks of mission accidents to the general public and on-site workers at the launch complex. This Nuclear Risk Assessment (NRA) addresses the responses of the MMRTG or LWRHU options to potential accident and abort conditions during the launch opportunity for the Mars 2020 mission and the associated consequences. This information provides the technical basis for the radiological risks of both options for the EIS.

  19. Environmental impact assessment for a radioactive waste facility: A case study

    SciTech Connect (OSTI)

    Devgun, J.S.

    1990-01-01

    A 77-ha site, known as the Niagara Falls Storage Site and located in northwestern New York State, holds about 190, 000 m{sup 3} of soils, wastes, and residues contaminated with radium and uranium. The facility is owned by the US Department of Energy. The storage of residues resulting from the processing of uranium ores started in 1944, and by 1950 residues from a number of plants were received at the site. The residues, with a volume of about 18,000 m{sup 3}, account for the bulk of the radioactivity, which is primarily due to Ra-226; because of the extraction of uranium from the ore, the amount of uranium remaining in the residues is quite small. An analysis of the environmental impact assessment and environmental compliance actions taken to date at this site and their effectiveness are discussed. This case study provides an illustrative example of the complexity of technical and nontechnical issues for a large radiative waste facility. 11 refs., 7 figs., 2 tabs.

  20. Ethical implications of democratic theory for U.S. public participation in environmental impact assessment

    SciTech Connect (OSTI)

    Hourdequin, Marion; Landres, Peter; Hanson, Mark J.; Craig, David R.

    2012-07-15

    Traditional mechanisms for public participation in environmental impact assessment under U.S. federal law have been criticized as ineffective and unable to resolve conflict. As these mechanisms are modified and new approaches developed, we argue that participation should be designed and evaluated not only on practical grounds of cost-effectiveness and efficiency, but also on ethical grounds based on democratic ideals. In this paper, we review and synthesize modern democratic theory to develop and justify four ethical principles for public participation: equal opportunity to participate, equal access to information, genuine deliberation, and shared commitment. We then explore several tensions that are inherent in applying these ethical principles to public participation in EIA. We next examine traditional NEPA processes and newer collaborative approaches in light of these principles. Finally, we explore the circumstances that argue for more in-depth participatory processes. While improved EIA participatory processes do not guarantee improved outcomes in environmental management, processes informed by these four ethical principles derived from democratic theory may lead to increased public engagement and satisfaction with government agency decisions. - Highlights: Black-Right-Pointing-Pointer Four ethical principles based on democratic theory for public participation in EIA. Black-Right-Pointing-Pointer NEPA and collaboration offer different strengths in meeting these principles. Black-Right-Pointing-Pointer We explore tensions inherent in applying these principles. Black-Right-Pointing-Pointer Improved participatory processes may improve public acceptance of agency decisions.

  1. Accelerated Depletion: Assessing Its Impacts on Domestic Oil and Natural Gas Prices and Production

    Reports and Publications (EIA)

    2000-01-01

    Analysis of the potential impacts of accelerated depletion on domestic oil and natural gas prices and production.

  2. Assessing health impacts in complex eco-epidemiological settings in the humid tropics: Modular baseline health surveys

    SciTech Connect (OSTI)

    Winkler, Mirko S.; Divall, Mark J.; Krieger, Gary R.; Schmidlin, Sandro; Magassouba, Mohamed L.; Knoblauch, Astrid M.; Singer, Burton H.; Utzinger, Juerg

    2012-02-15

    The quantitative assessment of health impacts has been identified as a crucial feature for realising the full potential of health impact assessment (HIA). In settings where demographic and health data are notoriously scarce, but there is a broad range of ascertainable ecological, environmental, epidemiological and socioeconomic information, a diverse toolkit of data collection strategies becomes relevant for the mainly small-area impacts of interest. We present a modular, cross-sectional baseline health survey study design, which has been developed for HIA of industrial development projects in the humid tropics. The modular nature of our toolkit allows our methodology to be readily adapted to the prevailing eco-epidemiological characteristics of a given project setting. Central to our design is a broad set of key performance indicators, covering a multiplicity of health outcomes and determinants at different levels and scales. We present experience and key findings from our modular baseline health survey methodology employed in 14 selected sentinel sites within an iron ore mining project in the Republic of Guinea. We argue that our methodology is a generic example of rapid evidence assembly in difficult-to-reach localities, where improvement of the predictive validity of the assessment and establishment of a benchmark for longitudinal monitoring of project impacts and mitigation efforts is needed.

  3. Environmental Assessment and Finding of No Significant Impact: Implementation of the Wetland Mitigation Bank Program at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-04-28

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  4. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 4 Environmental Impacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-1 CHAPTER 4 ENVIRONMENTAL IMPACTS The following sections describe the environmental impacts that could occur as a result of the proposed activities at the WIPP site. 4.1 HUMAN HEALTH The human health impacts of the proposed astrophysics experiments are quantified in this section to the extent possible given the uncertainties in the actual experiments to be performed at WIPP. For the most part, the health hazards associated with each experiment are discussed individually, although specific

  5. NWCC Guidelines for Assessing the Economic Development Impacts of Wind Power

    SciTech Connect (OSTI)

    Michael Taylor, Northwest Economic Associates Alan Fox, Northwest Economic Associates Jill Chilton, Northwest Economic Associates NWCC Economic Development Work Group Contributors Steve Clemmer, Lisa Daniels, Ed DeMeo, Rick Halet, Ron Lehr, Michael Milligan Vince Robinson

    2002-02-12

    OAK-B135 The primary objective of this study is to provide examples of thorough and consistent analysis and documentation of economic impacts from wind power development.

  6. Habitat Evaluation: Guidance for the Review of Environmental Impact Assessment Documents (EPA, 1993)

    Broader source: Energy.gov [DOE]

    This Environmental Protection Agency document is designed to assist NEPA reviewers in evaluation the ecological risks associated with the impacts of federal activities.

  7. Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Potable Water System Upgrade (03/29/06)

    Office of Environmental Management (EM)

    OF NO SIGNIFICANT IMPACT AND FINAL ENVIRONMENTAL ASSESSMENT FOR THE Y-12 POTABLE WATER SYSTEM UPGRADE U.S. Department of Energy Oak Ridge Y-12 Site Office National Nuclear Security Administration DOE/EA - 1548 March 2006 DOE/EA-1548 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Potable Water System Upgrade U.S. Department of Energy National Nuclear Security Administration March 2006 Final Environmental Assessment for the Y-12 Potable Water System Upgrade TABLE

  8. Microsoft Word - NRAP-TRS-I-003-2016_Key Factors for Assessing Potential Groundwater Impacts.20160128.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Factors for Assessing Potential Groundwater Impacts Due to Leakage from Geologic Carbon Sequestration Reservoirs 28 January 2016 Office of Fossil Energy NRAP-TRS-I-003-2016 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness,

  9. Assessing the Impact of Heat Rejection Technology on CSP Plant Revenue: Preprint

    SciTech Connect (OSTI)

    Wagner, M. J.; Kutscher, C. F.

    2010-10-01

    This paper explores the impact of cooling technology on revenue for hybrid-cooled plants with varying wet cooling penetration for four representative locations in the American Southwest. The impact of ACC design-point initial temperature difference (ITD - the difference between the condensing steam temperature and ambient dry-bulb) is also included in the analysis.

  10. A STRUCTURAL IMPACT ASSESSMENT OF FLAWS DETECTED DURING ULTRASONIC EXAMINATION OF TANK 15

    SciTech Connect (OSTI)

    Wiersma, B; James Elder, J

    2008-08-21

    Ultrasonic (UT) inspection of Tank 15 was conducted between April and July 2007 in accordance with the Tank 15 UT inspection plan. This was a planned re-inspection of this tank, the previous one was performed in 2002. Ten cracks were characterized in the previous examination. The re-inspection was performed to verify the present models and understanding for stress corrosion cracking. During this re-examination, one indication that was initially reported as a 'possible perpendicular crack <25% through wall' in 2002, was clearly shown not to be a crack. Additionally, examination of a new area immediately adjacent to other cracks along a vertical weld revealed three new cracks. It is not known when these new cracks formed as they could very well have been present in 2002 as well. Therefore, a total of twelve cracks were evaluated during the re-examination. A critical review of the information describing stress corrosion crack behavior for the SRS waste tanks, as well as a summary review of the service history of Tank 15, was performed. Each crack was then evaluated for service exposure history, consistency of the crack behavior with the current understanding of stress corrosion cracking, and present and future impact to the structural integrity of the tank. Crack instability calculations were performed on each crack for a bounding waste removal loading condition in Tank 15. In all cases, the crack behavior was determined to be consistent with the previous understanding of stress corrosion cracking in the SRS waste tank environment. The length of the cracks was limited due to the short-range nature of the residual stresses near seam, repair and attachment welds. Of the twelve cracks, nine were located in the vapor space above the sludge layer, including the three new cracks. Comparison of the crack lengths measured in 2002 and 2007 revealed that crack growth had occurred in four of the six previously measured vapor space cracks. However, the growth remained within the residual stress zone. None of the three cracks beneath the sludge showed evidence of growth. The impact of the cracks that grew on the future service of Tank 15 was also assessed. Tank 15 is expected to undergo closure activities including sludge waste removal. A bounding loading condition for waste removal of the sludge at the bottom of Tank 15 was considered for this analysis. The analysis showed that the combination of hydrostatic, seismic, pump and weld residual stresses are not expected to drive any of the cracks identified during the Tank 15 UT inspection to instability. Wall thickness mapping for general thinning and pitting was also performed. No significant wall thinning was observed. The average wall thickness values were well above nominal. Two isolated pit-like indications were observed. Both were approximately 30 mils deep. However, the remaining wall thickness was still greater than nominal specified for the original construction plate material. It was recommended that a third examination of selected cracks in Tank 15 be performed in 2014. This examination would provide information to determine whether any additional detectable degradation is occurring in Tank 15 and to supplement the basis for characterization of conditions that are non-aggressive to tank corrosion damage. The in-service inspection program is re-evaluated on a three year periodicity. The Type I and II tanks are not active receipt tanks at present, and are therefore not a part of the In-Service Inspection Program for the Type III Tanks [1]. Changes to the mission for Tank 15 and other Type I and II tanks may be considered by the In-Service Inspection Review Committee (ISIRC) and the program adjusted accordingly.

  11. Impact of WRF Physics and Grid Resolution on Low-level Wind Prediction: Towards the Assessment of Climate Change Impact on Future Wind Power

    SciTech Connect (OSTI)

    Chin, H S; Glascoe, L; Lundquist, J; Wharton, S

    2010-02-24

    The Weather Research and Forecast (WRF) model is used in short-range simulations to explore the sensitivity of model physics and horizontal grid resolution. We choose five events with the clear-sky conditions to study the impact of different planetary boundary layer (PBL), surface and soil-layer physics on low-level wind forecast for two wind farms; one in California (CA) and the other in Texas (TX). Short-range simulations are validated with field measurements. Results indicate that the forecast error of the CA case decreases with increasing grid resolution due to the improved representation of valley winds. Besides, the model physics configuration has a significant impact on the forecast error at this location. In contrast, the forecast error of the TX case exhibits little dependence on grid resolution and is relatively independent of physics configuration. Therefore, the occurrence frequency of lowest root mean square errors (RMSEs) at this location is used to determine an optimal model configuration for subsequent decade-scale regional climate model (RCM) simulations. In this study, we perform two sets of 20-year RCM simulations using the data from the NCAR Global Climate Model (GCM) simulations; one set models the present climate and the other simulates the future climate. These RCM simulations will be used to assess the impact of climate change on future wind energy.

  12. Local governments' efforts to implement environmental impact assessment requirements on development activities: Cause and effect in North Carolina

    SciTech Connect (OSTI)

    Spangler, J.A. )

    1993-01-01

    Various government entities in North Carolina have seen the need to implement specific policy which requires organizations responsible for certain development activities to perform a detailed assessment of comprehensive environmental impacts. Some governments have enacted policy, and a number of others are evaluating the need for policy implementation. The consideration of environmental effects of the development action early in the project planning process is, in many cases, an effect of the implementation of such policies, rather than a purpose. This study evaluates the varying ideals and rationale upon which local leaders have based environmental policies. Also, this study assesses the effectiveness of a variety of policies currently enacted and compares the final results of projects which have had to comply with the policies. Through the use of a survey distributed to officials responsible for policy enactment, local government personnel responsible for implementation and others involved in both public and private development, a relative assessment of effectiveness of different policies is postulated.

  13. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    SciTech Connect (OSTI)

    Mueller, Robert P.; Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  14. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; LLoyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2014-02-01

    This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

  15. Coal mining and the resource community cycle: A longitudinal assessment of the social impacts of the Coppabella coal mine

    SciTech Connect (OSTI)

    Lockie, S.; Franettovich, M.; Petkova-Timmer, V.; Rolfe, J.; Ivanova, G.

    2009-09-15

    Two social impact assessment (SIA) studies of Central Queensland's Coppabella coal mine were undertaken in 2002-2003 and 2006-2007. As ex post studies of actual change, these provide a reference point for predictive assessments of proposed resource extraction projects at other sites, while the longitudinal element added by the second study illustrates how impacts associated with one mine may vary over time due to changing economic and social conditions. It was found that the traditional coupling of local economic vitality and community development to the life cycle of resource projects - the resource community cycle - was mediated by labour recruitment and social infrastructure policies that reduced the emphasis on localised employment and investment strategies. and by the cumulative impacts of multiple mining projects within relative proximity to each other. The resource community cycle was accelerated and local communities forced to consider ways of attracting secondary investment and/or alternative industries early in the operational life of the Coppabella mine in order to secure significant economic benefits and to guard against the erosion of social capital and the ability to cope with future downturns in the mining sector.

  16. Impact Assessment of Plug-in Hybrid Vehicles on the U.S. Power Grid

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW; Nguyen, Tony B.; Jin, Chunlian; Balducci, Patrick J.; Secrest, Thomas J.

    2010-09-30

    The US electricity grid is a national infrastructure that has the potential to deliver significant amounts of the daily driving energy of the US light duty vehicle (cars, pickups, SUVs, and vans) fleet. This paper discusses a 2030 scenario with 37 million plug-in hybrid electric vehicles (PHEVs) on the road in the US demanding electricity for an average daily driving distance of about 33 miles (53 km). The paper addresses the potential grid impacts of the PHEVs fleet relative to their effects on the production cost of electricity, and the emissions from the electricity sector. The results of this analysis indicate significant regional difference on the cost impacts and the CO2 emissions. Battery charging during the day may have twice the cost impacts than charging during the night. The CO2 emissions impacts are very region-dependent. In predominantly coal regions (Midwest), the new PHEV load may reduce the CO2 emission intensity (ton/MWh), while in others regions with significant clean generation (hydro and renewable energy) the CO2 emission intensity may increase. Discussed will the potential impact of the results with the valuation of carbon emissions.

  17. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; Lloyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2013-11-01

    Environmental and health impacts are presented for activities associated with transient testing of nuclear fuel and material using two candidate test reactors. Transient testing involves irradiation of nuclear fuel or materials for short time-periods under high neutron flux rates. The transient testing process includes transportation of nuclear fuel or materials inside a robust shipping cask to a hot cell, removal from the shipping cask, pre-irradiation examination of the nuclear materials, assembly of an experiment assembly, transportation of the experiment assembly to the test reactor, irradiation in the test reactor, transport back to the hot cell, and post-irradiation examination of the nuclear fuel or material. The potential for environmental or health consequences during the transportation, examination, and irradiation actions are assessed for normal operations, off-normal (accident) scenarios, and transportation. Impacts to the environment (air, soil, and groundwater), are assessed during each phase of the transient testing process. This report documents the evaluation of potential consequences to the general public. This document supports the Environmental Assessment (EA) required by the U.S. National Environmental Policy Act (NEPA) (42 USC Subsection 4321 et seq.).

  18. Calculating Impacts of Energy Standards on Energy Demand in U.S. Buildings with Uncertainty in an Integrated Assessment Model

    SciTech Connect (OSTI)

    Scott, Michael J.; Daly, Don S.; Hathaway, John E.; Lansing, Carina S.; Liu, Ying; McJeon, Haewon C.; Moss, Richard H.; Patel, Pralit L.; Peterson, Marty J.; Rice, Jennie S.; Zhou, Yuyu

    2015-10-01

    In this paper, an integrated assessment model (IAM) uses a newly-developed Monte Carlo analysis capability to analyze the impacts of more aggressive U.S. residential and commercial building-energy codes and equipment standards on energy consumption and energy service costs at the state level, explicitly recognizing uncertainty in technology effectiveness and cost, socioeconomics, presence or absence of carbon prices, and climate impacts on energy demand. The paper finds that aggressive building-energy codes and equipment standards are an effective, cost-saving way to reduce energy consumption in buildings and greenhouse gas emissions in U.S. states. This conclusion is robust to significant uncertainties in population, economic activity, climate, carbon prices, and technology performance and costs.

  19. Final environmental impact assessment of the Paducah Gaseous Diffusion Plant site, Paducah, Kentucky

    SciTech Connect (OSTI)

    Not Available

    1982-08-01

    This document considers: the need for uranium enrichment facilities; site location; plant description; and describes the power generating facilities in light of its existing environment. The impacts from continuing operations are compared with alternatives of shutdown, relocation, and alternative power systems. (PSB)

  20. Volume 9: A Review of Socioeconomic Impacts of Oil Shale Development WESTERN OIL SHALE DEVELOPMENT: A TECHNOLOGY ASSESSMENT

    SciTech Connect (OSTI)

    Rotariu,, G. J.

    1982-02-01

    The development of an oil shale industry in northwestern Colorado and northeastern Utah has been forecast at various times since early this century, but the comparatively easy accessibility of other oil sources has forestalled development. Decreasing fuel supplies, increasing energy costs, and the threat of a crippling oil embargo finally may launch a commercial oil shale industry in this region. Concern for the possible impacts on the human environment has been fostered by experiences of rapid population growth in other western towns that have hosted energy resource development. A large number of studies have attempted to evaluate social and economic impacts of energy development and to determine important factors that affect the severity of these impacts. These studies have suggested that successful management of rapid population growth depends on adequate front-end capital for public facilities, availability of housing, attention to human service needs, long-range land use and fiscal planning. This study examines variables that affect the socioeconomic impacts of oil shale development. The study region is composed of four Colorado counties: Mesa, Moffat, Garfield and Rio Blanco. Most of the estimated population of 111 000 resides in a handful of urban areas that are separated by large distances and rugged terrain. We have projected the six largest cities and towns and one planned company town (Battlement Mesa) to be the probable centers for potential population impacts caused by development of an oil shale industry. Local planners expect Battlement Mesa to lessen impacts on small existing communities and indeed may be necessary to prevent severe regional socioeconomic impacts. Section II describes the study region and focuses on the economic trends and present conditions in the area. The population impacts analyzed in this study are contingent on a scenario of oil shale development from 1980-90 provided by the Department of Energy and discussed in Sec. III. We recognize that the rate of development, the magnitude of development, and the technology mix that will actually take place remain uncertain. Although we emphasize that other energy and mineral resources besides oil shale may be developed, the conclusions reached in this study reflect only those impacts that would be felt from the oil shale scenario. Socioeconomic impacts in the region reflect the uneven growth rate implied by the scenario and will be affected by the timing of industry developments, the length and magnitude of the construction phase of development, and the shift in employment profiles predicted in the scenario. The facilities in the southern portion of the oil shale region, those along the Colorado River and Parachute Creek, show a peak in the construction work force in the mid-1980s, whereas those f acil it i es in the Piceance Creek Bas into the north show a construction peak in the late 1980s. Together, the facilities will require a large construction work force throughout the decade, with a total of 4800 construction workers required in 1985. Construction at the northern sites and second phase construction in the south will require 6000 workers in 1988. By 1990, the operation work force will increase to 7950. Two important characteristics of oil shale development emerge from the work force estimates: (1) peak-year construction work forces will be 90-120% the size of the permanent operating work force; and (2) the yearly changes in total work force requirements will be large, as much as 900 in one year at one facility. To estimate population impacts on individual communities, we devised a population distribution method that is described in Sec. IV. Variables associated with the projection of population impacts are discussed and methodologies of previous assessments are compared. Scenario-induced population impacts estimated by the Los Alamos method are compared to projections of a model employed by the Colorado West Area Council of Governments. Oil shale development in the early decade, as defined by the scenario, will produce growth primarily

  1. Assessing the Thermal Environmental Impacts of an Groundwater Heat Pump in Southeastern Washington State

    SciTech Connect (OSTI)

    Freedman, Vicky L.; Waichler, Scott R.; Mackley, Rob D.; Horner, Jacob A.

    2012-04-01

    A thermal analysis of a large-scale (e.g., 1900 gpm), open-loop ground source heat pump (GSHP) installed on the Pacific Northwest National Laboratory (PNNL) campus in southeastern Washington State has been performed using a numerical modeling approach. Water temperature increases at the upgradient extraction wells in the system and at the downgradient Columbia River are potential concerns, especially since heat rejection to the subsurface will occur year-round. Hence, thermal impacts of the open-loop GSHP were investigated to identify operational scenarios that minimized downgradient environmental impacts at the river, and upgradient temperature drift at the production wells. Simulations examined the sensitivity of the system to variations in pumping rates and injected water temperatures, as well as to hydraulic conductivity estimates of the aquifer. Results demonstrated that both downgradient and upgradient thermal impacts were more sensitive to injection flow rates than estimates of hydraulic conductivity. Higher injection rates at lower temperatures resulted in higher temperature increases at the extraction wells but lower increases at the river. Conversely, lower pumping rates and higher injected water temperatures resulted in a smaller temperature increase at the extraction wells, but higher increases at the river. The scenario with lower pumping rates is operationally more efficient, but does increase the likelihood of a thermal plume discharging into the Columbia River. However, this impact would be mitigated by mixing within the hyporheic zone and the Columbia River. The impact under current operational conditions is negligible, but future increases in heat rejection could require a compromise between maximizing operational efficiency and minimizing temperature increases at the shoreline.

  2. Economic Impacts from the Boulder County, Colorado, ClimateSmart Loan Program: Using Property-Assessed Clean Energy Financing

    SciTech Connect (OSTI)

    Goldberg, M.; Cliburn, J. K.; Coughlin, J.

    2011-04-01

    This report examines the economic impacts (including job creation) from the Boulder County, Colorado, ClimateSmart Loan Program (CSLP), an example of Property-Assessed Clean Energy (PACE) financing. The CSLP was the first test of PACE financing on a multi-jurisdictional level (involving individual cities as well as the county government). It was also the first PACE program to comprehensively address energy efficiency measures and renewable energy, and it was the first funded by a public offering of both taxable and tax-exempt bonds.

  3. The National Environmental Policy Act net (NEPAnet) and DOE NEPA Web: What they bring to environmental impact assessment

    SciTech Connect (OSTI)

    Jessee, L.

    1998-01-01

    The US National Environmental Policy Act of 1969 (NEPA) requires agencies to use a systematic, interdisciplinary approach to ensure integrated use of natural and social sciences and the environmental design arts in planning and decision-making. Numerous environmental analyses have been prepared that contain valuable information about regions and ecosystems, but these data were not stored in a retrievable manner. In 1993 and 1994, agency-specific NEPA and related datasets were consolidated into the US Department of Energy NEPA Web and NEPAnet. These improve the efficiency and effectiveness of the environmental impact assessment/NEPA process in the US.

  4. Microsoft Word - NETL-TRS-4-2012_Integration of Spatial Data to Support Risk and Impact Assessments_20121221.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration of Spatial Data to Support Risk and Impact Assessments for Deep and Ultra-deepwater Hydrocarbon Activities in the Gulf of Mexico 21 December 2012 Office of Fossil Energy NETL-TRS-4-2012 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the

  5. Environmental Assessment and Finding of No Significant Impact: Wind Energy Center Edgeley/Kulm Project, North Dakota

    SciTech Connect (OSTI)

    N /A

    2003-04-15

    The proposed Edgeley/Kulm Project is a 21-megawatt (MW) wind generation project proposed by Florida Power and Light (FPL) Energy North Dakota Wind LLC (Dakota Wind) and Basin Electric Power Cooperative (Basin). The proposed windfarm would be located in La Moure County, south central North Dakota, near the rural farming communities of Kulm and Edgeley. The proposed windfarm is scheduled to be operational by the end of 2003. Dakota Wind and other project proponents are seeking to develop the proposed Edgeley/Kulm Project to provide utilities and, ultimately, electric energy consumers with electricity from a renewable energy source at the lowest possible cost. A new 115-kilovolt (kV) transmission line would be built to transmit power generated by the proposed windfarm to an existing US Department of Energy Western Area Power Administration (Western) substation located near Edgeley. The proposed interconnection would require modifying Western's Edgeley Substation. Modifying the Edgeley Substation is a Federal proposed action that requires Western to review the substation modification and the proposed windfarm project for compliance with Section 102(2) of the National Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4332, and Department of Energy NEPA Implementing Procedures (10 CFR Part 1021). Western is the lead Federal agency for preparation of this Environmental Assessment (EA). The US Fish and Wildlife Service (USFWS) is a cooperating agency with Western in preparing the EA. This document follows regulation issued by the Council on Environmental Quality (CEQ) for implementing procedural provisions of NEPA (40 CFR 1500-1508), and is intended to disclose potential impacts on the quality of the human environment resulting from the proposed project. If potential impacts are determined to be significant, preparation of an Environmental Impact Statement would be required. If impacts are determined to be insignificant, Western would complete a Finding of No Significant Impact (FONSI). Environmental protection measures that would be included in the design of the proposed project are included.

  6. Assessment of Future Vehicle Transportation Options and their Impact on the Electric Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future Vehicle Transportation Options and Their Impact on the Electric Grid January 10, 2010 New Analysis of Alternative Transportation Technologies 3 What's New? * Additional Alternative Transportation Vehicles - Compressed Air Vehicles (CAVs) * Use electricity from the grid to power air compressor that stores compressed air - Natural Gas Vehicles (NGVs) * Connection to grid is in competing demand for fuel * Still an internal combustion engine (ICE) - Hydrogen Vehicles * Use fuel cell

  7. Comparative environmental impact and efficiency assessment of selected hydrogen production methods

    SciTech Connect (OSTI)

    Ozbilen, Ahmet Dincer, Ibrahim Rosen, Marc A.

    2013-09-15

    The environmental impacts of various hydrogen production processes are evaluated and compared, considering several energy sources and using life cycle analysis. The results indicate that hydrogen produced by thermochemical water decomposition cycles are more environmentally benign options compared to conventional steam reforming of natural gas. The nuclear based four-step CuCl cycle has the lowest global warming potential (0.559 kg CO{sub 2}-eq per kg hydrogen production), mainly because it requires the lowest quantity of energy of the considered processes. The acidification potential results show that biomass gasification has the highest impact on environment, while wind based electrolysis has the lowest. The relation is also investigated between efficiency and environmental impacts. -- Highlights: Environmental performance of nuclear-based hydrogen production is investigated. The GWP and AP results are compared with various hydrogen production processes. Nuclear based 4-step CuCl cycle is found to be an environmentally benign process. Wind-based electrolysis has the lowest AP value.

  8. Replacement of chlorofluorocarbons (CFCs) at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; Saylor, R.E.; McCold, L.N.

    1994-06-01

    The US Department of Energy (DOE) formerly operated two gaseous diffusion plants (GDPs) for enriching uranium and maintained a third shutdown GDP. These plants maintain a large inventory of dichlorotetrafluorethane (CFC-114), a cholorofluorocarbon (CFC), as a coolant. The paper evaluates the global impacts of four alternatives to modify GDP coolant system operations for a three-year period beginning in 1996. Interim modification of GDP coolant system operations has the potential to reduce stratospheric ozone depletion from GDP coolant releases while a permanent solution is studied.

  9. Environmental impact assessment of solid waste management in Beijing City, China

    SciTech Connect (OSTI)

    Zhao Yan; Christensen, Thomas H.; Lu Wenjing; Wu Huayong; Wang Hongtao

    2011-04-15

    The environmental impacts of municipal solid waste management in Beijing City were evaluated using a life-cycle-based model, EASEWASTE, to take into account waste generation, collection, transportation, treatment/disposal technologies, and savings obtained by energy and material recovery. The current system, mainly involving the use of landfills, has manifested significant adverse environmental impacts caused by methane emissions from landfills and many other emissions from transfer stations. A short-term future scenario, where some of the landfills (which soon will reach their capacity because of rising amount of waste in Beijing City) are substituted by incinerators with energy recovery, would not result in significant environmental improvement. This is primarily because of the low calorific value of mixed waste, and it is likely that the incinerators would require significant amounts of auxiliary fuels to support combustion of wet waste. As for the long-term future scenario, efficient source separation of food waste could result in significant environmental improvements, primarily because of increase in calorific value of remaining waste incinerated with energy recovery. Sensitivity analysis emphasized the importance of efficient source separation of food waste, as well as the electricity recovery in incinerators, in order to obtain an environmentally friendly waste management system in Beijing City.

  10. Replacement of chlorofluorocarbons (CFCs) at the DOE Gaseous Diffusion Plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; Saylor, R.E.; McCold, L.N.

    1994-12-31

    The US Department of Energy (DOE) operates two uranium enrichment plants. Together, the two plants maintain an inventory of approximately 14 million pounds of a chlorofluorocarbon (CFC), dichlorote-trafluoroethane (CFC-114) as a coolant. Annual operational CFC-114 losses total over 500,000 pounds. In February, 1992, President Bush announced that the US would terminate manufacture and importation of Class 1 ozone depleting substances (including CFC-114) by the end of 1995. To comply with this requirement DOE has considered introducing a replacement coolant by the end of 1995. Two perfluorocarbons (PFCs) - namely, octofluoro-cyclobutane and decafluorobutane - are presently the only known coolants that could meet safety requirements. They would not contribute to stratospheric ozone depletion but contribute to global warming. The paper describes an analysis of the potential global impacts of the proposed replacement of CFC-114 with a PFC. A problem with analyses of global warming and ozone depletion impacts is that even large sources of compounds that contribute to these effects contribute only very small fractions of the total effect. The authors take the position that significant effects to global warming and ozone depletion have already occurred, and that any additional contribution to these effects are contributions to cumulatively significant adverse effects on the environment. The paper describes four alternatives and the extent to which each would contribute to global warming and ozone depletion.

  11. An Update of the Analytical Groundwater Modeling to Assess Water Resource Impacts at the Afton Solar Energy Zone

    SciTech Connect (OSTI)

    Quinn, John J.; Greer, Christopher B.; Carr, Adrianne E.

    2014-10-01

    The purpose of this study is to update a one-dimensional analytical groundwater flow model to examine the influence of potential groundwater withdrawal in support of utility-scale solar energy development at the Afton Solar Energy Zone (SEZ) as a part of the Bureau of Land Management’s (BLM’s) Solar Energy Program. This report describes the modeling for assessing the drawdown associated with SEZ groundwater pumping rates for a 20-year duration considering three categories of water demand (high, medium, and low) based on technology-specific considerations. The 2012 modeling effort published in the Final Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States (Solar PEIS; BLM and DOE 2012) has been refined based on additional information described below in an expanded hydrogeologic discussion.

  12. Environmental assessment and finding of no significant impact: Biorecycling Technologies, Inc., Noble Biogas and Fertilizer Plant, Fresno County, California

    SciTech Connect (OSTI)

    1997-09-01

    The US Department of Energy (DOE) is considering a proposal from the California Energy Commission for partial funding up to $1,500,000 of the construction of the biorecycling Technologies, Inc., (BTI) Noble Biogas and Fertilizer Plant in Fresno County, California. BTI along with its contractors and business partners would develop the plant, which would use manure and green waste to produce biogas and a variety of organic fertilizer products. The California Energy Commission has requested funding from the DOE Commercialization Ventures program to assist in the construction of the plant, which would produce up to one megawatt of electricity by burning biogas in a cogeneration unit. The purpose of this environmental assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with funding development of the proposed project.

  13. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  14. Assessment of Potential Flood Events and Impacts at INL's Proposed Remote-Handled Low-Level Waste Disposal Facility Sites

    SciTech Connect (OSTI)

    A. Jeff Sondrup; Annette L. Schafter

    2010-09-01

    Rates, depths, erosion potential, increased subsurface transport rates, and annual exceedance probability for potential flooding scenarios have been evaluated for the on-site alternatives of Idaho National Laboratorys proposed remote handled low-level waste disposal facility. The on-site disposal facility is being evaluated in anticipation of the closure of the Radioactive Waste Management Complex at the INL. An assessment of flood impacts are required to meet the Department of Energys Low-Level Waste requirements (DOE-O 435.1), its natural phenomena hazards assessment criteria (DOE-STD-1023-95), and the Radioactive Waste Management Manual (DOE M 435.1-1) guidance in addition to being required by the National Environmental Policy Act (NEPA) environmental assessment (EA). Potential sources of water evaluated include those arising from (1) local precipitation events, (2) precipitation events occurring off of the INL (off-site precipitation), and (3) increased flows in the Big Lost River in the event of a Mackay Dam failure. On-site precipitation events include potential snow-melt and rainfall. Extreme rainfall events were evaluated for the potential to create local erosion, particularly of the barrier placed over the disposal facility. Off-site precipitation carried onto the INL by the Big Lost River channel was evaluated for overland migration of water away from the river channel. Off-site precipitation sources evaluated were those occurring in the drainage basin above Mackay Reservoir. In the worst-case scenarios, precipitation occurring above Mackay Dam could exceed the dams capacity, leading to overtopping, and eventually complete dam failure. Mackay Dam could also fail during a seismic event or as a result of mechanical piping. Some of the water released during dam failure, and contributing precipitation, has the potential of being carried onto the INL in the Big Lost River channel. Resulting overland flows from these flood sources were evaluated for their erosion potential, ability to overflow the proposed disposal facility, and for their ability to increase migration of contaminants from the facility. The assessment of available literature suggests that the likelihood of detrimental flood water impacting the proposed RH-LLW facility is extremely low. The annual exceedance probability associated with uncontrolled flows in the Big Lost River impacting either of the proposed sites is 1x10-5, with return interval (RI) of 10,000yrs. The most probable dam failure scenario has an annual exceedance probability of 6.3x10-6 (1.6x105 yr RI). In any of the scenarios generating possible on-site water, the duration is expected to be quite short, water depths are not expected to exceed 0.5 m, and the erosion potential can easily be mitigated by emplacement of a berm (operational period), and an engineered cover (post closure period). Subsurface mobilization of radionuclides was evaluated for a very conservative flooding scenario resulting in 50 cm deep, 30.5 day on-site water. The annual exceedance probability for which is much smaller than 3.6x10-7 (2.8x106 yr RI). For the purposes of illustration, the facility was assumed to flood every 500 years. The periodically recurring flood waters were predicted to marginally increase peak radionuclide fluxes into the aquifer by at most by a factor of three for non-sorbing radionuclides, and to have limited impact on peak radionuclide fluxes into the aquifer for contaminants that do sorb.

  15. Failure Impact Analysis of Key Management in AMI Using Cybernomic Situational Assessment (CSA)

    SciTech Connect (OSTI)

    Abercrombie, Robert K; Sheldon, Frederick T; Hauser, Katie R; Lantz, Margaret W; Mili, Ali

    2013-01-01

    In earlier work, we presented a computational framework for quantifying the security of a system in terms of the average loss a stakeholder stands to sustain as a result of threats to the system. We named this system, the Cyberspace Security Econometrics System (CSES). In this paper, we refine the framework and apply it to cryptographic key management within the Advanced Metering Infrastructure (AMI) as an example. The stakeholders, requirements, components, and threats are determined. We then populate the matrices with justified values by addressing the AMI at a higher level, rather than trying to consider every piece of hardware and software involved. We accomplish this task by leveraging the recently established NISTR 7628 guideline for smart grid security. This allowed us to choose the stakeholders, requirements, components, and threats realistically. We reviewed the literature and selected an industry technical working group to select three representative threats from a collection of 29 threats. From this subset, we populate the stakes, dependency, and impact matrices, and the threat vector with realistic numbers. Each Stakeholder s Mean Failure Cost is then computed.

  16. Assessment of PNGV fuels infrastructure. Phase 1 report: Additional capital needs and fuel-cycle energy and emissions impacts

    SciTech Connect (OSTI)

    Wang, M.; Stork, K.; Vyas, A.; Mintz, M.; Singh, M.; Johnson, L.

    1997-01-01

    This report presents the methodologies and results of Argonne`s assessment of additional capital needs and the fuel-cycle energy and emissions impacts of using six different fuels in the vehicles with tripled fuel economy (3X vehicles) that the Partnership for a New Generation of Vehicles is currently investigating. The six fuels included in this study are reformulated gasoline, low-sulfur diesel, methanol, ethanol, dimethyl ether, and hydrogen. Reformulated gasoline, methanol, and ethanol are assumed to be burned in spark-ignition, direct-injection engines. Diesel and dimethyl ether are assumed to be burned in compression-ignition, direct-injection engines. Hydrogen and methanol are assumed to be used in fuel-cell vehicles. The authors have analyzed fuels infrastructure impacts under a 3X vehicle low market share scenario and a high market share scenario. The assessment shows that if 3X vehicles are mass-introduced, a considerable amount of capital investment will be needed to build new fuel production plants and to establish distribution infrastructure for methanol, ethanol, dimethyl ether, and hydrogen. Capital needs for production facilities will far exceed those for distribution infrastructure. Among the four fuels, hydrogen will bear the largest capital needs. The fuel efficiency gain by 3X vehicles translates directly into reductions in total energy demand, fossil energy demand, and CO{sub 2} emissions. The combination of fuel substitution and fuel efficiency results in substantial petroleum displacement and large reductions in emissions of nitrogen oxide, carbon monoxide, volatile organic compounds, sulfur oxide, and particulate matter of size smaller than 10 microns.

  17. Qualitative assessment of the impacts of proposed system operating strategies to resident fish within selected Columbia River Reservoirs

    SciTech Connect (OSTI)

    Shreffler, D.K.; Geist, D.R.; Mavros, W.V.

    1994-01-01

    The Bonneville Power Administration (BPA), Bureau of Reclamation (BOR), and US Army Corps of Engineers (COE) are presently conducting the System Operation Review (SOR) for the Columbia River basin. The SOR began in 1990 and is expected to provide an operating strategy that will take into consideration multiple uses of the Columbia River system including navigation, flood control, irrigation, power generation, fish migration, fish and wildlife habitat, recreation, water supply, and water quality. This report provides descriptions of each of the non-modeled reservoirs and other specified river reaches. The descriptions focus on the distinct management goals for resident fish: biodiversity, species-specific concerns, and sport fisheries. In addition, this report provides a qualitative assessment of impacts to the resident fish within these reservoirs and river reaches from the 7 alternative system operating strategies. In addition to this introduction, the report contains four more sections. Section 2.0 provides the methods that were used. Reservoir descriptions appear in Section 3.0, which is a synthesis of our literature review and interviews with resident fish experts. Section 4.0 contains a discussion of potential impacts to fish within each of these reservoirs and river reaches from the 7 proposed system operating strategies. The references cited are listed in Section 5.0.

  18. Assessing Energy Impact of Plug-In Hybrid Electric Vehicles: Significance of Daily Distance Variation over Time and Among Drivers

    SciTech Connect (OSTI)

    Lin, Zhenhong [ORNL; Greene, David L [ORNL

    2012-01-01

    Accurate assessment of the impact of plug-in hybrid electric vehicles (PHEVs) on petroleum and electricity consumption is a necessary step toward effective policies. Variations in daily vehicle miles traveled (VMT) over time and among drivers affect PHEV energy impact, but the significance is not well understood. This paper uses a graphical illustration, a mathematical derivation, and an empirical study to examine the cause and significance of such an effect. The first two methods reveal that ignoring daily variation in VMT always causes underestimation of petroleum consumption and overestimation of electricity consumption by PHEVs; both biases increase as the assumed PHEV charge-depleting (CD) range moves closer to the average daily VMT. The empirical analysis based on national travel survey data shows that the assumption of uniform daily VMT over time and among drivers causes nearly 68% underestimation of expected petroleum use and nearly 48% overestimation of expected electricity use by PHEVs with a 40-mi CD range (PHEV40s). Also for PHEV40s, consideration of daily variation in VMT over time but not among drivers similar to the way the utility factor curve is derived in SAE Standard SAE J2841 causes underestimation of expected petroleum use by more than 24% and overestimation of expected electricity use by about 17%. Underestimation of petroleum use and overestimation of electricity use increase with larger-battery PHEVs.

  19. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  20. Surface water drainage system. Environmental assessment and finding of no significant impact

    SciTech Connect (OSTI)

    1996-05-01

    This Environmental Assessment (EA) is written pursuant to the National Environmental Policy Act (NEPA). The document identifies and evaluates the action proposed to correct deficiencies in, and then to maintain, the surface water drainage system serving the Department of Energy`s Rocky Flats Environmental Technology Site (Site), located north of Golden, Colorado. Many of the activities proposed would not normally be subject to this level of NEPA documentation. However, in many cases, maintenance of the system has been deferred to the point that wetlands vegetation has become established in some ditches and culverts, creating wetlands. The proposed activities would damage or remove some of these wetlands in order to return the drainage system to the point that it would be able to fully serve its intended function - stormwater control. The Department of Energy (DOE) regulations require that activities affecting environmentally sensitive areas like wetlands be the subject of an EA. Most portions of the surface water drainage system are presently inadequate to convey the runoff from a 100-year storm event. As a result, such an event would cause flooding across much of the Site and possibly threaten the integrity of the dams at the terminal ponds. Severe flooding would not only cause damage to facilities and equipment, but could also facilitate the transport of contaminants from individual hazardous substance sites (IHSSs). Uncontrolled flow through the A- and B-series ponds could cause contaminated sediments to become suspended and carried downstream. Additionally, high velocity flood flows significantly increase erosion losses.

  1. Assessment of H-Coal process developments: impact on the performance and economics of a proposed commercial plant

    SciTech Connect (OSTI)

    Talib, A.; Gray, D.; Neuworth, M.

    1984-01-01

    This report assesses the performance of the H-Coal process, a catalytic direct liquefaction process, at a process development and large pilot-plant scale of operation. The assessment focused on the evaluation of operating results from selected long-term successful process development unit (PDU) and pilot plant runs made on Illinois No. 6 coal. The pilot plant has largely duplicated the product yield structure obtained during the PDU runs. Also, the quality of products, particularly liquid products, produced during the pilot plant run is quite comparable to that produced during the PDU runs. This confirms the scalability of the H-Coal ebullated-bed reactor system from a PDU-scale, 3 tons of coal per day, to a large pilot scale, 220 tons of coal per day, plant. The minor product yield differences, such as higher yields of C/sub 3/, C/sub 4/, and naphtha fractions, and lower yields of distillate oils obtained during pilot plant runs as compared to the PDU runs, will not impact the projected technical and economic performance of a first-of-a-kind commercial H-Coal plant. Thus, the process yield and operating data collected during the PDU operations provided an adequate basis for projecting the technical and economic performance of the proposed H-Coal commercial plant. 18 references, 9 figures, 56 tables.

  2. Assessing the Importance and Impact of Glycomics and Glycosciences Phase II

    SciTech Connect (OSTI)

    Zolandz, Dorothy

    2013-02-07

    Glycans form one of the four basic classes of macromolecules in living systems, along with nucleic acids, proteins, and lipids. They are composed of individual sugar units that can be linked to one another in multiple ways, enabling them to form complex three-dimensional structures. In living systems, glycans are involved in myriad processes that are part of normal cellular physiology, development, and signaling, as well as in the development of both chronic and infectious diseases. Because of their ubiquity on cell surfaces, they are key components of biological interfaces and are involved in molecular recognition and signaling. They are also important molecules in cell adhesion and cell movement. Meanwhile, glycans on proteins inside cells participate in the cells responses to incoming signals, for example by helping to modulate gene expression and protein functions. Glycan polymers such as cellulose are important components of plant cell walls. Understanding how such walls are assembled and how they can be deconstructed is fundamental to basic plant biology, but also in the development of applications such as efficient conversion of biomass into fuels. Glycan polymers derived from plants and other organisms can also serve as sources of new materials with wide-ranging applications from tissue engineering scaffolds to flexible electronic displays. Achieving an understanding of the structures and functions of glycans is fundamental to understanding biology. The National Research Council report resulting from this project, Transforming Glycoscience: A Roadmap for the Future, discusses the impact glycoscience can have across health, energy, and materials science and lays out a roadmap of research goals whose achievement could help the field become a widely-recognized and integrated discipline rather than a niche area studied by a small number of specialists. Despite advances, gaps remain in the current suite of tools for investigating glycans and these tools often require expert users and facilities, presenting a barrier for many investigators. The field is poised to benefit from the pursuit of the framework laid out in the study, which incorporates not only human physiology and health but also plant, animal, and microbial research and efforts to improve tools for synthesis, analysis, data management, and other fundamental research infrastructure.

  3. Preliminary Scoping and Assessment Study of the Potential Impacts of Community-wide Radiological Events and Subsequent Decontamination Activities on Drinking Water and Wastewater Systems

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; Tomasko, D.; Chen, S.Y.; Hais, A.; MacKinney, J.; Janke, R.

    2006-07-01

    Since the terrorist attacks of September 11, 2001, there has been a great deal of concern about further attacks within the United States, particularly attacks using weapons of mass destruction (WMD) or other unconventional weapons, such as a radiological dispersal device (RDD) or 'dirty bomb', which is a type of RDD. During all phases of an RDD event, secondary impacts on drinking water and wastewater systems would be possible. Secondary impacts refer to those impacts that would occur when the water systems were not the direct or intended target of the specific event. Secondary impacts would include (1) fallout from an event occurring elsewhere on water supply reservoirs and (2) runoff into storm water and sewer systems during precipitation events or as a result of cleanup and decontamination activities. To help address potential secondary impacts, a scoping and assessment study was conducted for the U.S. Environmental Protection Agency's National Homeland Security Research Center to support its water security program. The study addresses the potential impacts on water resources and infrastructure that could result from the use of an RDD, including potential impacts from the initial attack as well as from subsequent cleanup efforts. Eight radionuclides are considered in the assessment: Am-241, Cf-252, Cs-137, Co-60, Ir-192, Pu-238, Ra-226, and Sr-90. (authors)

  4. DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID After completing a careful assessment, the U.S. Department of Energy has determined that building a new facility at its Idaho National Laboratory site for continued disposal of remote-handled low level radioactive waste generated by operations at the site will not have a significant impact on the environment.

  5. Micronucleus frequency and hematologic index in Colossoma macropomum (Pisces, Ariidae) for environmental impact assessment at a protected area in Brazil

    SciTech Connect (OSTI)

    Sousa, Debora Batista Pinheiro; Neta, Raimunda Nonata Fortes Carvalho

    2014-10-06

    This study used micronucleus assays and erythrocyte indices in the freshwater fish tambaqui, Colossoma macropomum, to assess environmental impacts in the Environmental Protection Area at Maracan, So Luis, Brazil. Fish were sampled from two locations within the protected area, Serena Lagoon and Ambude River, on four occasions. Biometric data (length and weight) and an aliquot of blood were collected from each fish for analysis. Erythrocyte indices including: mean corpuscular volume, mean corpuscular hemoglobin and mean corpuscular hemoglobin concentration were calculated, and blood samples were examined for micronuclei and nuclear morphological changes. Micronuclei were found in fish from both locations, although the frequency was higher in fish from Ambude River. Nuclear morphological changes were identified only in fish collected from Ambude River. Several nuclear morphological changes were found in erythrocytes stained with Giemsa, including: micronuclei and binucleate nuclei. On average, erythrocyte indices were lower in fish collected from Ambude River than in those from Serena Lagoon. Our results indicate that micronuclei and erythrocyte indices can be used in C. macropomum as indicators of environmental health.

  6. Life cycle assessment of urban waste management: Energy performances and environmental impacts. The case of Rome, Italy

    SciTech Connect (OSTI)

    Cherubini, Francesco Bargigli, Silvia; Ulgiati, Sergio

    2008-12-15

    Landfilling is nowadays the most common practice of waste management in Italy in spite of enforced regulations aimed at increasing waste pre-sorting as well as energy and material recovery. In this work we analyse selected alternative scenarios aimed at minimizing the unused material fraction to be delivered to the landfill. The methodological framework of the analysis is the life cycle assessment, in a multi-method form developed by our research team. The approach was applied to the case of municipal solid waste (MSW) management in Rome, with a special focus on energy and material balance, including global and local scale airborne emissions. Results, provided in the form of indices and indicators of efficiency, effectiveness and environmental impacts, point out landfill activities as the worst waste management strategy at a global scale. On the other hand, the investigated waste treatments with energy and material recovery allow important benefits of greenhouse gas emission reduction (among others) but are still affected by non-negligible local emissions. Furthermore, waste treatments leading to energy recovery provide an energy output that, in the best case, is able to meet 15% of the Rome electricity consumption.

  7. DRSPALL: Impact of the Modification of the Numerical Spallings Model on Waste Isolation Pilot Plant Performance Assessment.

    SciTech Connect (OSTI)

    Kicker, Dwayne Curtis; Herrick, Courtney G.; Zeitler, Todd; Malama, Bwalya; Rudeen, David Keith; Gilkey, Amy P.

    2016-01-01

    The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant (WIPP) solid waste subject to material failure and transport to the surface as a result of a hypothetical future inadvertent drilling intrusion. An error in the implementation of the DRSPALL finite difference equations was discovered as documented in Software Problem Report (SPR) 13-001. The modifications to DRSPALL to correct the finite difference equations are detailed, and verification and validation testing has been completed for the modified DRSPALL code. The complementary cumulative distribution function (CCDF) of spallings releases obtained using the modified DRSPALL is higher compared to that found in previous WIPP performance assessment (PA) calculations. Compared to previous PAs, there was an increase in the number of vectors that result in a nonzero spallings volume, which generally translates to an increase in spallings releases. The overall mean CCDFs for total releases using the modified DRSPALL are virtually unchanged, thus the modification to DRSPALL did not impact WIPP PA calculation results.

  8. Decision Impact Assessment Model

    Energy Science and Technology Software Center (OSTI)

    1991-08-01

    DIAMOND represents the decision-making environment that utility planners and executives face. Users interact with the model after every year or two of simulation, which provides an opportunity to modify past decisions as well as to make new decisions. For example, construction of a power plant can be started one year, and if circumstances change, the plant can be accelerated, mothballed, cancelled, or continued as originally planned. Similarly, the marketing and financial incentives for demand-side managementmore » programs can be changed from year to year. This frequent user interaction with the model, an operational game, should build greater understanding and insights among utility planners about the risks associated with different types of resources.« less

  9. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.

  10. Assessing National Employment Impacts of Investment in Residential and Commercial Sector Energy Efficiency: Review and Example Analysis

    SciTech Connect (OSTI)

    Anderson, David M.; Belzer, David B.; Livingston, Olga V.; Scott, Michael J.

    2014-06-18

    Pacific Northwest National Laboratory (PNNL) modeled the employment impacts of a major national initiative to accelerate energy efficiency trends at one of two levels: • 15 percent savings by 2030. In this scenario, efficiency activities save about 15 percent of the Annual Energy Outlook (AEO) Reference Case electricity consumption by 2030. It is assumed that additional energy savings in both the residential and commercial sectors begin in 2015 at zero, and then increase in an S-shaped market penetration curve, with the level of savings equal to about 7.0 percent of the AEO 2014 U.S. national residential and commercial electricity consumption saved by 2020, 14.8 percent by 2025, and 15 percent by 2030. • 10 percent savings by 2030. In this scenario, additional savings begin at zero in 2015, increase to 3.8 percent in 2020, 9.8 percent by 2025, and 10 percent of the AEO reference case value by 2030. The analysis of the 15 percent case indicates that by 2030 more than 300,000 new jobs would likely result from such policies, including an annual average of more than 60,000 jobs directly supporting the installation and maintenance of energy efficiency measures and practices. These are new jobs resulting initially from the investment associated with the construction of more energy-efficient new buildings or the retrofit of existing buildings and would be sustained for as long as the investment continues. Based on what is known about the current level of building-sector energy efficiency jobs, this would represent an increase of more than 10 percent from the current estimated level of over 450,000 such jobs. The more significant and longer-lasting effect comes from the redirection of energy bill savings toward the purchase of other goods and services in the general economy, with its attendant influence on increasing the total number of jobs. This example analysis utilized PNNL’s ImSET model, a modeling framework that PNNL has used over the past two decades to assess the economic impacts of the U.S. Department of Energy’s (DOE’s) energy efficiency programs in the buildings sector.

  11. Grid Impacts of Wind Power Variability: Recent Assessments from a Variety of Utilities in the United States (Presentation)

    SciTech Connect (OSTI)

    Parsons, B.

    2006-03-01

    Presentation for the European Wind Energy Conference held February 27--March 2, 2006, in Athens, Greece, showing grid impacts of wind power variability.

  12. Report to Congress on Assessment of Potential Impact of Concentrating Solar Power for Electriicty Generation (EPACT 2005--Section 934(c))

    SciTech Connect (OSTI)

    Wilkins, F.

    2007-02-01

    Summary of DOE's assessment of issues regarding EPAct 2005, which requires the Secretary of Energy to assess conflicting guidance on the economic potential of concentrating solar power for electricity production.

  13. Management & Administration Forms (0000-1999) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management & Administration Forms (0000-1999) Management & Administration Forms (0000-1999) DOE F 206.1 (pdf) Privacy Impact Assessment (PIA) DOE F 206.4 (fillable pdf) Information ...

  14. Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry: Impacts of Government Policies and Assessment of Future Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    101 Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry: Impacts of Government Policies and Assessment of Future Opportunities May 2011 Prepared by: David L. Greene Oak Ridge National Laboratory K.G. Duleep ICF International Girish Upreti University of Tennessee DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1,

  15. A Large-Scale, High-Resolution Hydrological Model Parameter Data Set for Climate Change Impact Assessment for the Conterminous US

    SciTech Connect (OSTI)

    Oubeidillah, Abdoul A; Kao, Shih-Chieh; Ashfaq, Moetasim; Naz, Bibi S; Tootle, Glenn

    2014-01-01

    To extend geographical coverage, refine spatial resolution, and improve modeling efficiency, a computation- and data-intensive effort was conducted to organize a comprehensive hydrologic dataset with post-calibrated model parameters for hydro-climate impact assessment. Several key inputs for hydrologic simulation including meteorologic forcings, soil, land class, vegetation, and elevation were collected from multiple best-available data sources and organized for 2107 hydrologic subbasins (8-digit hydrologic units, HUC8s) in the conterminous United States at refined 1/24 (~4 km) spatial resolution. Using high-performance computing for intensive model calibration, a high-resolution parameter dataset was prepared for the macro-scale Variable Infiltration Capacity (VIC) hydrologic model. The VIC simulation was driven by DAYMET daily meteorological forcing and was calibrated against USGS WaterWatch monthly runoff observations for each HUC8. The results showed that this new parameter dataset may help reasonably simulate runoff at most US HUC8 subbasins. Based on this exhaustive calibration effort, it is now possible to accurately estimate the resources required for further model improvement across the entire conterminous United States. We anticipate that through this hydrologic parameter dataset, the repeated effort of fundamental data processing can be lessened, so that research efforts can emphasize the more challenging task of assessing climate change impacts. The pre-organized model parameter dataset will be provided to interested parties to support further hydro-climate impact assessment.

  16. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current resource plans can be used to support region-wide resource assessment and tracking of state/utility progress in meeting the WGA's energy-efficiency goals (WGA 2004); and (3) offer recommendations on information and documentation of energy-efficiency resources that should be included in future resource plans to facilitate comparative review and regional coordination. The scope of this report covers projected electric end-use efficiency investments reported in all Western utility resource plans that were publicly available as of February 2006. While a few utilities included additional demand-side resources, such as demand response, in their plans, we do not report that information. However, many of the issues and recommendations in reference to energy efficiency in this report are relevant to other demand-side resources as well. This report is organized as follows. Section 2 outlines the data sources and approach used in this study and conceptualizes methods and metrics for tracking energy-efficiency resources over time. Section 3 presents results from the review of the utility resource plans. Important issues encountered in reviewing the resource plans are discussed in section 4. Finally, section 5 concludes with recommendations for improving the tracking and reporting of energy efficiency in forthcoming resource plans.

  17. Economic assessment of the impact on coal production due to enforcement of the Surface Mining Control and Reclamation Act of 1977. Benefits report. Volume 1. Final report

    SciTech Connect (OSTI)

    Kyle, T.N.; McOmber, R.M.; Roberts, J.M.

    1980-10-31

    The study assesses the major economic benefits and costs that are associated with the enforcement of the Surface Mining Control and Reclamation ACt (SMCRA). The report addresses the benefits of surface coal mining and land reclamation that follow from the Act. As originally conceived, the study was to evaluate, preferably in monetary terms, the specific benefits and socio-economic impacts of SMCRA. However, it was apparent, in the course of the initial analysis, that historical evaluation of specific benefits and socio-economic/environmental impacts is complicated by the short time that SMCRA has been in operation. It was also apparent that development of substantive, and defensible, quantified estimates of benefits and impacts is hindered by the absence of a great deal of needed numerical data, and by incomplete understanding of the reclamation processes that the Act is intended to enhance. Rather than attempt to evaluate specific benefits and socio-economic/environmental impacts, the study evaluated existing research studies on the impacts of surface mining, land reclamation, and SMCRA, and evaluated existing data sources relevant to surface mining, land reclamation, and SMCRA.

  18. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    SciTech Connect (OSTI)

    Evans, K.; Woodside, D.; Bruegmann, M.

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  19. Richland Badge Request PIA

    Energy Savers [EERE]

  20. Medgate-PIA.pdf

    Energy Savers [EERE]

  1. edos-pia.pdf

    Energy Savers [EERE]

  2. BPA Land Records PIA

    Energy Savers [EERE]

  3. New Pilot Study on Sea Level Rise Offers Approach That Can Help Communities Assess Possible Impact of Sea Level Rise on Energy Assets

    Broader source: Energy.gov [DOE]

    As part of our commitment to improve the resilience of our electric grid in the face of extreme weather events, OE has released findings of a pilot study that explores the feasibility of assessing the impacts of sea level rise on energy infrastructure. The goal of our study was to develop a method to identify energy facilities exposed to sea level rise (SLR) through 2100 that is flexible and scalable, uses existing and robust data sources, accounts for global and local sea level changes, and can incorporate results from regional studies.

  4. Economic assessment of the impact on coal production due to enforcement of the Surface Mining Control and Reclamation Act of 1977. Cost report. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-11-12

    The report summarizes the efforts made in the cost analysis portion of the 'Economic Assessment of the Impact on Coal Production Due to Enforcement of the Surface Mining Control and Reclamation Act (SMCRA) of 1977. The objective of the cost analysis portion of the study was to supplement the study's examination of the benefits of SMCRA with an analysis of the costs of SMCRA as based on industry experience and data. The analysis involved the development and field test of a methodology for constructing estimates of the costs of complying with regulations at individual surface coal mines.

  5. Finding of No Significant Impact and Final Environmental Assessment of Three Site Development Projects at the National Renewable Energy Laboratory South Table Mountain Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FINDING OF NO SIGNIFICANT IMPACT AND FINAL ENVIRONMENTAL ASSESSMENT OF THREE SITE DEVELOPMENT PROJECTS AT THE NATIONAL RENEWABLE ENERGY LABORATORY SOUTH TABLE MOUNTAIN SITE July 2007 U . S . D e p a r t m e n t o f E n e r g y G o l d e n F i e l d O f f i c e N a t i o n a l R e n e w a b l e E n e r g y L a b o r a t o r y 1 6 1 7 C o l e B o u l e v a r d G o l d e n , C o l o r a d o 8 0 4 0 1 DOE/EA-1573 Final Environmental Assessment of Three Site Development Projects at the National

  6. A spatially distributed model for the assessment of land use impacts on stream temperature in small urban watersheds

    SciTech Connect (OSTI)

    Sun, Ning; Yearsley, John; Voisin, Nathalie; Lettenmaier, D. P.

    2015-05-15

    Stream temperatures in urban watersheds are influenced to a high degree by anthropogenic impacts related to changes in landscape, stream channel morphology, and climate. These impacts can occur at small time and length scales, hence require analytical tools that consider the influence of the hydrologic regime, energy fluxes, topography, channel morphology, and near-stream vegetation distribution. Here we describe a modeling system that integrates the Distributed Hydrologic Soil Vegetation Model, DHSVM, with the semi-Lagrangian stream temperature model RBM, which has the capability to simulate the hydrology and water temperature of urban streams at high time and space resolutions, as well as a representation of the effects of riparian shading on stream energetics. We demonstrate the modeling system through application to the Mercer Creek watershed, a small urban catchment near Bellevue, Washington. The results suggest that the model is able both to produce realistic streamflow predictions at fine temporal and spatial scales, and to provide spatially distributed water temperature predictions that are consistent with observations throughout a complex stream network. We use the modeling construct to characterize impacts of land use change and near-stream vegetation change on stream temperature throughout the Mercer Creek system. We then explore the sensitivity of stream temperature to land use changes and modifications in vegetation along the riparian corridor.

  7. Technical support document: Energy efficiency standards for consumer products: Refrigerators, refrigerator-freezers, and freezers including draft environmental assessment, regulatory impact analysis

    SciTech Connect (OSTI)

    1995-07-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended by the National Appliance Energy Conservation Act of 1987 (P.L. 100-12) and by the National Appliance Energy Conservation Amendments of 1988 (P.L. 100-357), and by the Energy Policy Act of 1992 (P.L. 102-486), provides energy conservation standards for 12 of the 13 types of consumer products` covered by the Act, and authorizes the Secretary of Energy to prescribe amended or new energy standards for each type (or class) of covered product. The assessment of the proposed standards for refrigerators, refrigerator-freezers, and freezers presented in this document is designed to evaluate their economic impacts according to the criteria in the Act. It includes an engineering analysis of the cost and performance of design options to improve the efficiency of the products; forecasts of the number and average efficiency of products sold, the amount of energy the products will consume, and their prices and operating expenses; a determination of change in investment, revenues, and costs to manufacturers of the products; a calculation of the costs and benefits to consumers, electric utilities, and the nation as a whole; and an assessment of the environmental impacts of the proposed standards.

  8. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-12-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  9. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2010-08-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  10. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  11. Assessment of the Impact of Stochastic Day-Ahead SCUC on Economic and Reliability Metrics at Multiple Timescales: Preprint

    SciTech Connect (OSTI)

    Wu, H.; Ela, E.; Krad, I.; Florita, A.; Zhang, J.; Hodge, B. M.; Ibanez, E.; Gao, W.

    2015-03-01

    This paper incorporates the stochastic day-ahead security-constrained unit commitment (DASCUC) within a multi-timescale, multi-scheduling application with commitment, dispatch, and automatic generation control. The stochastic DASCUC is solved using a progressive hedging algorithm with constrained ordinal optimization to accelerate the individual scenario solution. Sensitivity studies are performed in the RTS-96 system, and the results show how this new scheduling application would impact costs and reliability with a closer representation of timescales of system operations in practice.

  12. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2003-03-13

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  13. Explanation of Significant Differences Between Models used to Assess Groundwater Impacts for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and Greater-Than-Class C-Like Waste Environmental Impact Statement (DOE/EIS-0375-D) and the

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01

    Models have been used to assess the groundwater impacts to support the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE-EIS 2011) for a facility sited at the Idaho National Laboratory and the Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project (INL 2011). Groundwater impacts are primarily a function of (1) location determining the geologic and hydrologic setting, (2) disposal facility configuration, and (3) radionuclide source, including waste form and release from the waste form. In reviewing the assumptions made between the model parameters for the two different groundwater impacts assessments, significant differences were identified. This report presents the two sets of model assumptions and discusses their origins and implications for resulting dose predictions. Given more similar model parameters, predicted doses would be commensurate.

  14. Environmental assessment, finding of no significant impact, and response to comments. Sold residue treatment, repackaging, and storage

    SciTech Connect (OSTI)

    1996-04-01

    From its founding in 1952 through the cessation of production in 1989, the United States Department of Energy`s (DOE) Rocky Flats Plant (now the Rocky Flats Environmental Technology Site [the Site]) produced components for nuclear weapons. Some of those components were made of plutonium. As a result of the processes used to recover and purify plutonium and manufacture the components, a variety of materials became contaminated with plutonium. If the level of contamination were low, the material was considered waste. However, if the concentration of plutonium in the material exceeded the {open_quotes}economic discard limit,{close_quotes} the materials were classified as {open_quotes}residue{close_quotes} rather than{open_quotes}Waste{close_quotes} and were stored for later recovery of the plutonium. While large quantities of residues were processed, others, primarily those more difficult to process, accumulated at the Site in storage. Two important events regarding residues have occurred at the Site since production activities ceased. One event was the end of the Cold War in 1991, which made the return to production of nuclear weapons, with their Rocky Flats-made components, unnecessary. This event led to DOE`s decision to permanently cease production at the Site, clean up and remove radioactive and chemical contamination at the Site, and find alternative uses for the Site. This document describes methods for processing of the wastes for safe interim storage. Environmental impacts from the processing and storage are discussed.

  15. Development of a Kelp-type Structure Module in a Coastal Ocean Model to Assess the Hydrodynamic Impact of Seawater Uranium Extraction Technology

    SciTech Connect (OSTI)

    Wang, Taiping; Khangaonkar, Tarang; Long, Wen; Gill, Gary A.

    2014-02-07

    In recent years, with the rapid growth of global energy demand, the interest in extracting uranium from seawater for nuclear energy has been renewed. While extracting seawater uranium is not yet commercially viable, it serves as a backstop to the conventional uranium resources and provides an essentially unlimited supply of uranium resource. With recent advances in seawater uranium extraction technology, extracting uranium from seawater could be economically feasible when the extraction devices are deployed at a large scale (e.g., several hundred km2). There is concern however that the large scale deployment of adsorbent farms could result in potential impacts to the hydrodynamic flow field in an oceanic setting. In this study, a kelp-type structure module was incorporated into a coastal ocean model to simulate the blockage effect of uranium extraction devices on the flow field. The module was quantitatively validated against laboratory flume experiments for both velocity and turbulence profiles. The model-data comparison showed an overall good agreement and validated the approach of applying the model to assess the potential hydrodynamic impact of uranium extraction devices or other underwater structures in coastal oceans.

  16. Calculating Impacts of Energy Standards on Energy Demand in U.S. Buildings under Uncertainty with an Integrated Assessment Model: Technical Background Data

    SciTech Connect (OSTI)

    Scott, Michael J.; Daly, Don S.; Hathaway, John E.; Lansing, Carina S.; Liu, Ying; McJeon, Haewon C.; Moss, Richard H.; Patel, Pralit L.; Peterson, Marty J.; Rice, Jennie S.; Zhou, Yuyu

    2014-12-06

    This report presents data and assumptions employed in an application of PNNLs Global Change Assessment Model with a newly-developed Monte Carlo analysis capability. The model is used to analyze the impacts of more aggressive U.S. residential and commercial building-energy codes and equipment standards on energy consumption and energy service costs at the state level, explicitly recognizing uncertainty in technology effectiveness and cost, socioeconomics, presence or absence of carbon prices, and climate impacts on energy demand. The report provides a summary of how residential and commercial buildings are modeled, together with assumptions made for the distributions of statelevel population, Gross Domestic Product (GDP) per worker, efficiency and cost of residential and commercial energy equipment by end use, and efficiency and cost of residential and commercial building shells. The cost and performance of equipment and of building shells are reported separately for current building and equipment efficiency standards and for more aggressive standards. The report also details assumptions concerning future improvements brought about by projected trends in technology.

  17. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide ...

  18. Life Cycle Assessment of a Parabolic Trough Concentrating Solar Power Plant and Impacts of Key Design Alternatives: Preprint

    SciTech Connect (OSTI)

    Heath, G. A.; Burkhardt, J. J.; Turchi, C. S.

    2011-09-01

    Climate change and water scarcity are important issues for today's power sector. To inform capacity expansion decisions, hybrid life cycle assessment is used to evaluate a reference design of a parabolic trough concentrating solar power (CSP) facility located in Daggett, California, along four sustainability metrics: life cycle greenhouse gas (GHG) emissions, water consumption, cumulative energy demand (CED), and energy payback time (EPBT). This wet-cooled, 103 MW plant utilizes mined nitrate salts in its two-tank, thermal energy storage (TES) system. Design alternatives of dry-cooling, a thermocline TES, and synthetically-derived nitrate salt are evaluated. During its life cycle, the reference CSP plant is estimated to emit 26 g CO2eq per kWh, consume 4.7 L/kWh of water, and demand 0.40 MJeq/kWh of energy, resulting in an EPBT of approximately 1 year. The dry-cooled alternative is estimated to reduce life cycle water consumption by 77% but increase life cycle GHG emissions and CED by 8%. Synthetic nitrate salts may increase life cycle GHG emissions by 52% compared to mined. Switching from two-tank to thermocline TES configuration reduces life cycle GHG emissions, most significantly for plants using synthetically-derived nitrate salts. CSP can significantly reduce GHG emissions compared to fossil-fueled generation; however, dry-cooling may be required in many locations to minimize water consumption.

  19. Environmental Assessment and Finding of No Significant Impact: On-Site Treatment of Low Level Mixed Waste

    SciTech Connect (OSTI)

    N /A

    1999-03-22

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1292) to evaluate the proposed treatment of low level mixed waste (LLMW) at the Rocky Flats Environmental Technology Site (Site). The purpose of the action is to treat LLMW in order to meet the Land Disposal Restrictions specified by the Resource Conservation and Recovery Act and the waste acceptance criteria of the planned disposal site(s). Approximately 17,000 cubic meters (m{sup 3}) of LLMW are currently stored at the Site. Another 65,000 m{sup 3}of LLMW are likely to be generated by Site closure activities (a total of 82,000 m{sup 3} of LLMW). About 35,000 m{sup 3} can be directly disposed of off-site without treatment, and most of the remaining 47,000 m{sup 3} of LLMW can be treated at off-site treatment, storage, and disposal facilities. However, some LLMW will require treatment on-site, either because it does not meet shipping requirements or because off-site treatment is not available for these particular types of LLMW. Currently, this LLMW is stored at the Site pending the development and implementation of effective treatment processes. The Site needs to treat this LLMW on-site prior to shipment to off-site disposal facilities, in order to meet the DOE long-term objective of clean up and closure of the Site. All on-site treatment of LLMW would comply with applicable Federal and State laws designed to protect public health and safety and to enhance protection of the environment. The EA describes and analyzes the environmental effects of the proposed action (using ten mobile treatment processes to treat waste on-site), and the alternatives of treating waste onsite (using two fixed treatment processes), and of taking no action. The EA was the subject of a public comment period from February 3 to 24, 1999. No written or other comments regarding the EA were received.

  20. Supplemental information related to risk assessment for the off-site transportation of low-level waste for the U.S. Department of Energy waste management programmatic environmental impact statement

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; LePoire, D.J.; Chen, S.Y. [Argonne National Lab., IL (United States). Environmental Assessment Div.

    1996-12-01

    This report presents supplemental information to support the human health risk assessment conducted for the transportation of low-level waste (LLW) in support of the US Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS). Detailed descriptions of the transportation health risk assessment method and results of the assessment are presented in Appendix E of the WM PEIS and are not repeated in this report. This report presents additional information that is not presented in Appendix E but that was needed to conduct the transportation risk assessment for Waste Management (WM) LLW. Included are definition of the LLW alternatives considered in the WM PEIS, data related to the inventory and to the physical and radiological characteristics of WM LLW, an overview of the risk assessment method, and detailed results of the assessment for each WM LLW alternative considered.

  1. Assessing the Impacts of Reduced Noise Operations of Wind Turbines on Neighbor Annoyance: A Preliminary Analysis in Vinalhaven, Maine

    SciTech Connect (OSTI)

    Hoen, Ben; Wiser, Ryan; Eckholdt, Haftan

    2010-06-23

    Neighbors living near the 3 turbine, 4.5 MW Vinalhaven, Maine wind power facility, which began operations in late 2009, have complained that the noise from the turbines is unwelcome and annoying. Fox Islands Wind, the owner of the facility, hypothesized that implementing a Noise Reduced Operation (NRO) for the turbines, which effectively limits the turbines maximum rpm and power output, would reduce the sound levels produced by the turbines, and therefore might also reduce the degree to which the neighbors report being annoyed by those sounds. To test this hypothesis in a preliminary fashion, a pilot study was conducted in early 2010, the results of which are the subject of this brief report. The study included asking near-by residents - those within roughly 3000 feet - to rate the sounds and the degree to which they were annoyed by them using logs which they filled out at multiple times during the day on as many days as were possible in the 35 day study period in February and March, 2010. Meanwhile, FIW adjusted the NRO settings of the turbines in a random fashion in the evenings during the same period, but in a pattern that the respondents were not made aware of. Ultimately, nine individuals turned in roughly 200 log entries (i.e., responses), each of which was time coded to allow testing if the response was correlated with the wind facility operating conditions at that time. The analysis of these data found small, non-statistically-significant differences in self-reported turbine loudness and annoyance ratings between the periods when the NRO was enacted and when it was not, after controlling for many of the relationships that could independently influence perceived loudness and annoyance (e.g., wind direction, time of day). Possible explanations for these small differences in self-reported turbine loudness and annoyance ratings include: the relative difference in sound output from the turbines when NRO was engaged and when it was not was small; and/or that differences in turbine sound outputs that did exist might have been masked by higher (non-turbine) wind sound levels that were coincident with NRO periods. Because this preliminary test only included a small portion of the population surrounding the turbines, the sample of self-reported ratings was itself very small. In addition, the conditions varied greatly over the study period, as described in the report that follows. Consequently, the results presented here should be considered preliminary, and further data collection and analysis are warranted. The main findings of this preliminary study are: (1) As planned, periods in which the NRO was engaged were found to have noticeably lower turbine rotational speeds (rpm), based on turbine operational data. (2) 11% of responses overall indicated that the turbines were perceived as either 'very' or 'extremely' loud at the time they were logged, and roughly two thirds of those (7% overall) indicated the sounds to be 'very' or 'extremely' annoying. (3) Self-reported turbine loudness and annoyance ratings were higher during the night and when the wind was from the North (participants in the study were located to the east and south of the turbines). (4) Self-reported turbine loudness and annoyance ratings were generally found to be lower during the NRO periods, but these observed differences are relatively small in magnitude, and are not statistically significant. (5) There is some limited evidence that high-speed surface winds mask self-reported turbine loudness and annoyance ratings. Therefore, because NRO settings are only engaged during periods of high winds, the true effects of the NRO adjustments might be diluted to some degree. (6) The results of this preliminary assessment should not be applied to the full population of homeowners near the turbines in Vinalhaven, Maine because the potentially most-sensitive individuals (those most vocal of their dislike of the turbine sounds) opted not to participate in the study, and because the study did not include the relatively large number of individuals who primarily visit the

  2. Analysis of methods and models for assessing the direct and indirect economic impacts of CO/sub 2/-induced environmental changes in the agricultural sector of the US economy

    SciTech Connect (OSTI)

    Callaway, J.M.

    1982-08-01

    Alternative methods for quantifying the economic impacts associated with future increases in the ambient concentration of CO/sub 2/ were examined. A literature search was undertaken, both to gain a better understanding of the ways in which CO/sub 2/ buildup could affect crop growth and to identify the different methods available for assessing the impacts of CO/sub 2/-induced environmental changes on crop yields. The second task involved identifying the scope of both the direct and indirect economic impacts that could occur as a result of CO/sub 2/-induced changes in crop yields. The third task then consisted of a comprehensive literature search to identify what types of economic models could be used effectively to assess the kinds of direct and indirect economic impacts that could conceivably occur as a result of CO/sub 2/ buildup. Specific attention was focused upon national and multi-regional agricultural sector models, multi-country agricultural trade models, and macroeconomic models of the US economy. The fourth and final task of this research involved synthesizing the information gathered in the previous tasks into a systematic framework for assessing the direct and indirect economic impacts of CO/sub 2/-induced environmental changes related to agricultural production.

  3. List of currently classified documents relative to Hanford Operations and of potential use in the Columbia River Comprehensive Impact Assessment, January 1, 1973--June 20, 1994

    SciTech Connect (OSTI)

    Miley, T.B.; Huesties, L.R.

    1995-02-01

    The Columbia River Comprehensive Impact Assessment (CRCIA) Project seeks to estimate the current risk from the Columbia River resulting from past and present Hanford activities. To resolve the question of the current risk, it is necessary for the CRCIA Project to have access to any classified information that may be relevant to this study. The purpose of this report is to present the results of the search for relevant classified information. There are two classified matter control centers operated by two prime contractors at the Hanford Site. One is operated by Pacific Northwest Laboratory (PNL) and the other is operated by Westinghouse Hanford Company (WHC). Only the WHC collection contained information relevant to a study of the Columbia River in the time frame of interest: January 1, 1973 through June 20, 1994. A list of the classified documents in the WHC collection is maintained in the WHC Classified Document Control database. The WHC Classified Document Control database was searched. The search criteria were the dates of interest and the basic keywords used for the CRCIA Project`s data compendium (Eslinger et al. 1994). All Hanford-generated, Hanford-related entries that were applicable to the CRCIA Project and the dates of interest were provided. The resulting list of 477 titles comprises the Appendix of this report. The information give for each title is exactly as it appears in the database. Any inconsistencies are the result of duplicating the database.

  4. Methods for Assessing the Impact of Fog Oil Smoke on Availability, Palatability, & Food Quality of Relevant Life Stages of Insects for Threatened and Endangered Species

    SciTech Connect (OSTI)

    Driver, Crystal J.; Strenge, Dennis L.; Su, Yin-Fong; Cullinan, Valerie I.; Herrington, Ricky S.; Saunders, Danielle L.; Rogers, Lee E.

    2007-04-01

    A methodology for quantifying population dynamics and food source value of insect fauna in areas subjected to fog oil smoke was developed. Our approach employed an environmentally controlled re-circulating wind tunnel outfitted with a high-heat vaporization and re-condensation fog oil generator that has been shown to produce aerosols of comparable chemistry and droplet-size distribution as those of field releases of the smoke. This method provides reproducible exposures of insects under realistic climatic and environmental conditions to fog oil aerosols that duplicate chemical and droplet-size characteristics of field releases of the smoke. The responses measured take into account reduction in food sources due to death and to changes in availability of relevant life stages of insects that form the prey base for the listed Threatened and Endangered Species. The influence of key environmental factors, wind speed and canopy structure on these responses were characterized. Data generated using this method was used to develop response functions related to particle size, concentration, wind speed, and canopy structure that will allow military personnel to assess and manage impacts to endangered species from fog oil smoke used in military training.

  5. Environmental Assessment and Finding of No Significant Impact: The Nevada Test Site Development Corporations's Desert Rock Sky Park at the Nevada Test Site

    SciTech Connect (OSTI)

    N /A

    2000-03-01

    The United States Department of Energy has prepared an Environmental Assessment (DOE/EA-1300) (EA) which analyzes the potential environmental effects of developing operating and maintaining a commercial/industrial park in Area 22 of the Nevada Test Site, between Mercury Camp and U.S. Highway 95 and east of Desert Rock Airport. The EA evaluates the potential impacts of infrastructure improvements necessary to support fill build out of the 512-acre Desert Rock Sky Park. Two alternative actions were evaluated: (1) Develop, operate and maintain a commercial/industrial park in Area 22 of the Nevada Test Site, and (2) taking no action. The purpose and need for the commercial industrial park are addressed in Section 1.0 of the EA. A detailed description of the proposed action and alternatives is in section 2.0. Section 3.0 describes the affected environment. Section 4.0 the environmental consequences of the proposed action and alternative. Cumulative effects are addressed in Section 5.0. Mitigation measures are addressed in Section 6.0. The Department of Energy determined that the proposed action of developing, operating and maintaining a commercial/industrial park in Area 22 of the Nevada Test Site would best meet the needs of the agency.

  6. ECONOMIC IMPACT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ECONOMIC IMPACT 2015 SANDIA NATIONAL LABORATORIES National Security Sandia's primary mission is ensuring the U.S. nuclear arsenal is safe, secure, and reliable, and can fully support our nation's deterrence policy. NUCLEAR WEAPONS DEFENSE SYSTEMS & ASSESSMENTS We provide technical solutions for global security by engineering and integrating advanced science and technology to help defend and protect the United States. Jill Hruby President and Laboratories Director "Qualified, diverse

  7. EA-0372: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Energy Conservation Standards for Consumer Products: Refrigerators, Furnaces and Television Sets including Environmental Assessment Regulatory Impact Analysis

  8. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer, Arthur S. Rood, A. Jeffrey Sondrup

    2011-12-23

    Groundwater impacts have been analyzed for the proposed remote-handled low-level waste disposal facility. The analysis was prepared to support the National Environmental Policy Act environmental assessment for the top two ranked sites for the proposed disposal facility. A four-phase screening and analysis approach was documented and applied. Phase I screening was site independent and applied a radionuclide half-life cut-off of 1 year. Phase II screening applied the National Council on Radiation Protection analysis approach and was site independent. Phase III screening used a simplified transport model and site-specific geologic and hydrologic parameters. Phase III neglected the infiltration-reducing engineered cover, the sorption influence of the vault system, dispersion in the vadose zone, vertical dispersion in the aquifer, and the release of radionuclides from specific waste forms. These conservatisms were relaxed in the Phase IV analysis which used a different model with more realistic parameters and assumptions. Phase I screening eliminated 143 of the 246 radionuclides in the inventory from further consideration because each had a half-life less than 1 year. An additional 13 were removed because there was no ingestion dose coefficient available. Of the 90 radionuclides carried forward from Phase I, 57 radionuclides had simulated Phase II screening doses exceeding 0.4 mrem/year. Phase III and IV screening compared the maximum predicted radionuclide concentration in the aquifer to maximum contaminant levels. Of the 57 radionuclides carried forward from Phase II, six radionuclides were identified in Phase III as having simulated future aquifer concentrations exceeding maximum contaminant limits. An additional seven radionuclides had simulated Phase III groundwater concentrations exceeding 1/100th of their respective maximum contaminant levels and were also retained for Phase IV analysis. The Phase IV analysis predicted that none of the thirteen remaining radionuclides would exceed the maximum contaminant levels for either site location. The predicted cumulative effective dose equivalent from all 13 radionuclides also was less than the dose criteria set forth in Department of Energy Order 435.1 for each site location. An evaluation of composite impacts showed one site is preferable over the other based on the potential for commingling of groundwater contamination with other facilities.

  9. Final base case community analysis: Indian Springs, Nevada for the Clark County socioeconomic impact assessment of the proposed high- level nuclear waste repository at Yucca Mountain, Nevada

    SciTech Connect (OSTI)

    1992-06-18

    This document provides a base case description of the rural Clark County community of Indian Springs in anticipation of change associated with the proposed high-level nuclear waste repository at Yucca Mountain. As the community closest to the proposed site, Indian Springs may be seen by site characterization workers, as well as workers associated with later repository phases, as a logical place to live. This report develops and updates information relating to a broad spectrum of socioeconomic variables, thereby providing a `snapshot` or `base case` look at Indian Springs in early 1992. With this as a background, future repository-related developments may be analytically separated from changes brought about by other factors, thus allowing for the assessment of the magnitude of local changes associated with the proposed repository. Given the size of the community, changes that may be considered small in an absolute sense may have relatively large impacts at the local level. Indian Springs is, in many respects, a unique community and a community of contrasts. An unincorporated town, it is a small yet important enclave of workers on large federal projects and home to employees of small- scale businesses and services. It is a rural community, but it is also close to the urbanized Las Vega Valley. It is a desert community, but has good water resources. It is on flat terrain, but it is located within 20 miles of the tallest mountains in Nevada. It is a town in which various interest groups diverge on issues of local importance, but in a sense of community remains an important feature of life. Finally, it has a sociodemographic history of both surface transience and underlying stability. If local land becomes available, Indian Springs has some room for growth but must first consider the historical effects of growth on the town and its desired direction for the future.

  10. Finding of No Significant Impact and Final Environmental Assessment for the Future Location of Heat Source/Radioisotope Power System Assembly and Testing and Operations Currently Located at the Mound Site

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    The U.S. Department of Energy (the Department) has completed an Environmental Assessment for the Future Location of the Heat Source/Radioisotope Power System Assembly and Test. Operations Currently Located at the Mound Site. Based on the analysis in the environmental assessment, the Department has determined that the proposed action, the relocation of the Department's heat source and radioisotope power system operations, does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the ''National Environmental Policy Act'' of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required, and the Department is issuing this Finding of No Significant Impact (FONSI).

  11. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan...

  12. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  13. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  14. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  15. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  16. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  17. PIV_System-PIA.pdf

    Energy Savers [EERE]

  18. IG.EIGPT.PIA.pdf

    Energy Savers [EERE]

  19. DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a...

  20. Assessment of the Impact of a New Guanidine Suppressor In NGS on F/H Laboratory Analyses For DWPF and Saltstone MCU Transfers

    SciTech Connect (OSTI)

    Bannochie, C. J.

    2013-04-29

    Implementation of the Next Generation Solvent (NGS) in the Modular Caustic-Side Solvent Extraction Unit (MCU) will now proceed with a new suppressor compound, 1,2,3-tris(3,7-dimethyloctyl)guanidine (TiDG), replacing the originally planned suppressor for NGS, 1,3-dicyclohexyl-2-(11-methyldodecyl) guanidine (DCiTG). The Savannah River National Laboratory (SRNL) was tasked with evaluating the potential impact to F/H Laboratory analyses supporting the Defense Waste Processing Facility (DWPF) Waste Acceptance Criteria (WAC) used to qualify transfers of MCU Strip Effluent (SE) into the facility and the Saltstone WAC used to qualify transfers of Tank 50 containing Decontaminated Salt Solution (DSS) from MCU into Saltstone. This assigned scope is covered by a Task Technical and Quality Assurance Plan (TTQAP). Previous impact evaluations were conducted when the DCiTG suppressor was planned for NGS and concluded that there was no impact to either the determination of MCU SE pH nor the analysis of Isopar L carryover in the MCU SE and DSS streams. SRNL reported on this series of cross-check studies between the SRNL and F/H Laboratories. The change in suppressor from DCiTG to TiDG in the NGS should not impact the measurement of Isopar L or pH in SE or DSS necessary to satisfy DWPF and Saltstone WAC (Tank 50) criteria, respectively. A statistical study of the low bias observed in Isopar L measurements in both SRNL and F/H Laboratories may be necessary now that the final NGS composition is fixed in order to quantify the low bias so that a proper correction can be applied to measurements critical to the DWPF and Saltstone WACs. Depending upon the final DWPF WAC requirement put in place for SE pH, it could become necessary to implement an alternative ICP-AES measurement of boron. The current blended solvent system testing in SRNL should address any impacts to Isopar L carryover into either the DSS or the SE. It is recommended that SRNL monitor the current blended solvent work underway with simulants in SRNL as well as any DWPF CPC testing done with the new SE stream to ascertain whether any need develops that could result in modification of any currently planned F/H Laboratory testing protocols.