Appendix 8 - iManage Change Management Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix 8 iManage Change Management Standards Department of Energy Deliverable ID: PM1001 Version number: 1.0 Draft/Final as of: 7/23/2012 Printed on: 27 Jul 2012 Author: Michael Preis Michael.Preis@hq.doe.gov (301)903-3812 Owner: Lajos Grof-Tisza, iManage Program Manager Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Configuration Management Plan Program Mgr: Lajos Grof-Tisza Doc ID: PM1001 Draft ii Document information Document source This document is maintained as an online document. Contact the author for the latest version. Revision history Version number Date Summary of changes Revised By 1.00 26 Feb 2007 Initial Version Michael Preis Approvals

2

Appendix 9 - iManage Interfaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 - iManage Interfaces 8 - iManage Interfaces STARS, STRIPES, IDW/iPortal utilize a number of internal and external interfaces to interconnect and share information within iManage, and other systems, both DOE and non-DOE. The PWS is not limited to the interfaces listed below as other interfaces may be required to be developed and/or supported during the performance of this contract. The current interfaces are described below. STARS The STARS interface programs utilize standard API's and Interface tables built into the Oracle Applications E-Business software suite. Standard Concurrent Requests within the financial system are configured to process the interface records once they are loaded into the interface tables. Successful interface records that process through the interface API's are inserted and

3

Appendix 2 - IManageRoadmap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the iManage Roadmap the iManage Roadmap Stakeholder Discussions 7/27/2012 - Draft 1 Stakeholder Discussions July 2012 1. Align DOE's strategic plan, and CF/MA/HC objectives, with iManage initiatives. 2. Use business goals to drive urgency and help explain the value proposition of what we are planning on the roadmap. 3. Create a framework to coordinate planning across iManage Roadmap goals 3. Create a framework to coordinate planning across multiple iManage systems and customer groups. 4. Capture cross-functional implications of the plan, such as dependencies on other systems and initiatives (a truly iManage view). 5. Determine reuse opportunities across domains. 6. Reflect consensus among all iManage stakeholders 7/27/2012 - Draft 2 1. Expand Business Process Improvement Services (DOE Strategic Plan 2011--

4

PIA - iManage Strategic Integrated Procurement Enterprise System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic...

5

PIA - iManage Strategic Integrated Procurement Enterprise System...  

NLE Websites -- All DOE Office Websites (Extended Search)

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA - iManage Strategic Integrated...

6

iManage Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

iManage Presentation iManage Presentation TuesdayDallasBallroomD1425Grof-Tisza.pdf More Documents & Publications Request for Information - Operations and Maintenance (O & M)...

7

MEMORANDUM FOR THE CHAIRPERSONS, I-MANAGE EXECUTIVE STEERING COMMITTEE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy . / Washington. DC 20585 Janvary 11, 2005 MEMORANDUM FOR THE CHAIRPERSONS, I-MANAGE EXECUTIVE STEERING COMMITTEE FROM: William S. Maharay Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on the "I-MANAGE STARS Implementation," Audit Report No.: OAS-L-05-02 The purpose of this report is to provide you with the results of our audit of the Department of Energy's (Department) implementation of the Integrated Management Navigation System (I- MANAGE) program's Standard Accounting and Reporting System (STARS). The report follows up on the challenges to successful implementation of STARS we highlighted in our interim report on "The Department's Implementation of I-MANAGE STARS" (Audit Report

8

iManage Strategic Integrated Procurement Enterprise System (STRIPES...  

NLE Websites -- All DOE Office Websites (Extended Search)

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management iManage Strategic Integrated Procurement Enterprise System...

9

iManage: Policy-Driven Self-management for Enterprise-Scale Systems  

E-Print Network (OSTI)

iManage: Policy-Driven Self-management for Enterprise-Scale Systems Vibhore Kumar, Brian F. Cooper of an adminis- trator's needs. In our iManage system we have developed a policy-driven system modeling framework that aims to bridge the gap between manageable compo- nents and manageable systems. In particular, iManage

Eisenhauer, Greg S.

10

Weatherization & Intergovernmental Program: Projects  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

& Intergovernmental Program Projects Site Map Bookmark and Share Projects From energy efficiency initiatives - such as residential weatherization and state capitol...

11

FedBizOpps iManage Special Notice - Amendment 1 - Aug 2, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

downloadsrequest-information-operations-and-maintenance- o-m-support-services-imanage) for future information pertaining to this requirement. All submissions become...

12

Appendix 1 -Additional iManage Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Additional iManage/Corporate Information Systems - Additional iManage/Corporate Information Systems In addition to STARS, STRIPES, IDW/iPortal, these are corporate systems maintained by the Office of Corporate Information Systems. These systems are currently not included as part of the requirements. Application/Project Automated Time and Attendance (ATAAPS) Budget and Reporting Code System (BARC) Budget Table System (BTS) Consent Order Tracking System (COTS) Consolidated Accounting and Investment System (CAIS) Departmental Audit Report Tracking System (DARTS) - Enhancements Departmental Audit Report Tracking System (DARTS) - Existing Departmental Inventory Management System (DIMS) DOEInfo eMailList ePerformance eRooms (Pensions) External CFO Website Folio (Portfolio Management) Funds Distribution System (FDS)

13

Materials Science Programs and Projects  

Science Conference Proceedings (OSTI)

... Materials Science Programs & Projects. ... In this project we measure the fundamental electrical properties of materials from bulk to nanoscale from ...

2010-09-22T23:59:59.000Z

14

Life Sciences Programs and Projects  

Science Conference Proceedings (OSTI)

... Life Sciences Programs & Projects. ... to PMT sensitivity and long-term stability ... Micronutrients Measurement Quality Assurance Program Last Updated ...

2010-05-24T23:59:59.000Z

15

Programs/Projects in ITL  

Science Conference Proceedings (OSTI)

Programs/Projects in ITL. ... Awareness, Training, Education (ATE) and Professional Development. ... Biometric Standards Program and Resource Center. ...

2010-10-05T23:59:59.000Z

16

Appendix 3 - iManage Help Desk Priority Level  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Appendix 3- iManage Help Desk Priority Levels Priority Level Definitions Resolution Time Critical Prevents normal operational business and for which there is no known workaround. Examples: inability to produce financial statements by required deadline, the inability to pay contractors in accordance with the Prompt Pay Act, the inability to commit or obligation funds, or Total loss of production service to entire customer set, or Impacts one or more service level commitments, or Impacts the delivery schedule Note 1: Reassignment must be communicated and directly agreed upon. Note 2: The initial response time for critical priority tickets must be within 60 minutes. Resolution is around the clock support until service is restored. Closure is

17

iManage Q&As Industry Day Aug 16 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

iManage Industry Day, Q & A iManage Industry Day, Q & A Office of the Chief Financial Officer Office of Corporate Information Systems iManage.om.procurement@hq.doe.gov DE-SOL-0004498 Page 1 of 5 Listed below are the questions submitted by vendors attending the August 16, 2012 iManage Industry Day. All questions were submitted on 3 x 5 index cards and answered at the end of the Industry Day session. All questions and the answers will be posted to FedBizOpps and FedConnect by August 31, 2012. 1. Where is the bright red line between current iManage2.0 contract and this new contract effort? Key distinction of what is a new effort versus and existing effort? The iManage 2.0 and the O&M contract are comprised of contractors working closely together with Federal staff to achieve consensus on resolutions as an integrated team.

18

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist The following checklist is...

19

Materials Science Programs and Projects  

Science Conference Proceedings (OSTI)

NIST Home > Materials Science Programs and Projects. ... the structure of crack tips, the rates ... as health care, communications, energy and electronics ...

2010-09-22T23:59:59.000Z

20

Weatherization & Intergovernmental Program: Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Program and the Energy Efficiency and Conservation Block Grant Program. AS GU MP PR VI State: Select one... Alaska Alabama Arkansas American Samoa Arizona California Colorado...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Nanomanufacturing Programs and Projects  

Science Conference Proceedings (OSTI)

... for the nanoscale stress distributions and surface defects that control device … more. Next-Generation Robotics and Automation Program Last ...

2010-05-24T23:59:59.000Z

22

Semiconductors Programs and Projects  

Science Conference Proceedings (OSTI)

... The Power Devices and Thermal Metrology Project develops electrical and ... Back-End-of-Line Reliability Metrology Development Last Updated Date ...

2010-05-24T23:59:59.000Z

23

Technical Standards, Program Project Justification Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Justification Statement - August 29, 2012 Technical Standards, Program Project Justification Statement - August 29, 2012 August 29, 2012 DOE Technical Standards Program...

24

Federal Energy Management Program: Awarded ESPC Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Awarded ESPC Projects to someone by E-mail Share Federal Energy Management Program: Awarded ESPC Projects on Facebook Tweet about Federal Energy Management Program: Awarded ESPC...

25

Appendix 8 - iManage Change Management Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: Robert Regan CHRISePerformance Project Manager Signature: Date: Matthew Sparks STRIPES Project Manager Signature: Date: Distribution This document has been distributed to:...

26

Computer Security Programs/Projects in ITL  

Science Conference Proceedings (OSTI)

Computer Security Programs/Projects in ITL. ... Awareness, Training, Education (ATE) and Professional ... Biometric Standards Program and Resource ...

2010-10-05T23:59:59.000Z

27

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Design Checklist Energy.gov Careers & Internships Policy &...

28

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SYSTEMS ENGINEERING PROGRAM: Requirements Management Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist Energy.gov Careers & Internships Policy &...

29

Hollings Marine Laboratory Programs and Projects  

Science Conference Proceedings (OSTI)

Hollings Marine Laboratory Programs and Projects. ... Inorganic Chemical Metrology Program Areas. ... Isotopes as Environmental Tracers in Archived ...

2012-11-16T23:59:59.000Z

30

EC-Web Project Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan More Documents & Publications CITSS Project Plan Audit Report: AP-FS-97-02 Request for Information - Operations and Maintenance (O & M) Support Services for the iManage...

31

Superconductors Programs/Projects in Electromagnetics  

Science Conference Proceedings (OSTI)

Superconductors Programs/Projects in Electromagnetics. Superconductor Electromechanics. Contact. General Information ...

2010-10-05T23:59:59.000Z

32

Superconductors Programs/Projects in PML  

Science Conference Proceedings (OSTI)

Superconductors Programs/Projects in PML. Quantum Information and Measurements. Quantum Sensors. ... Superconductor Electromechanics. ...

2010-10-05T23:59:59.000Z

33

Electric Power Metrology Programs/Projects in ...  

Science Conference Proceedings (OSTI)

Electric Power Metrology Programs/Projects in Semiconductors. Power Device and Thermal Metrology. Contact. General ...

2011-10-03T23:59:59.000Z

34

Mathematics Programs/Projects in Mathematical and ...  

Science Conference Proceedings (OSTI)

Mathematics Programs/Projects in Mathematical and Computational Sciences. ... Mathematics of Metrology: Foundation and Applications. Contact. ...

2010-10-05T23:59:59.000Z

35

Electronics & Telecommunications Programs/Projects in PML  

Science Conference Proceedings (OSTI)

Electronics & Telecommunications Programs/Projects in PML. ... Electric Power Metrology and the Smart Grid. Electronic Kilogram. ...

2010-10-05T23:59:59.000Z

36

University of Calgary iS2 Project: Integrated Service Deliveryg y  

E-Print Network (OSTI)

Delivery 7 #12;NEW Organizational Model HR HR Program AVP HR HR Program Management Office Admin. Assistant AdvisorsGroup Audit Group Special Purpose Reporting Asset Research Accounting Medicine RA M iManagement RA

Garousi, Vahid

37

Electric Power Metrology Programs/Projects in Quantum ...  

Science Conference Proceedings (OSTI)

Electric Power Metrology Programs/Projects in Quantum Electrical Metrology. Electric Power Metrology Programs/Projects ...

2011-10-03T23:59:59.000Z

38

Federal Energy Management Program: Project Funding  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Funding Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: Project Funding to someone by E-mail Share Federal Energy...

39

and IR-4 Project Programs  

E-Print Network (OSTI)

In both tables, erroneous industry direct effects were reported that do not impact the overall findings of this report. The direct effect numbers previously reported in Tables 4 and 5 were not used in the calculations of overall impacts. The corrected tables in this document do reflect the estimates, as described in the text of the original report. October 22, 2012Executive Summary The Interregional Research Project Number 4 (IR-4 Project) has been a pivotal resource in providing U.S. residents a plentiful and low-cost array of vegetables, fruits, berries and tree nuts since 1963 by facilitating the registration of newer, lower-toxic pest control products with the EPA for application on specialty crops. Specialty crop growers often are at a disadvantage relative to program crop growers in having access to effective crop loss mitigation options against common agricultural pests. Specialty crops make up about 40 percent of the total value of U.S. crop production and include both food and ornamental crops that afford insufficient economic incentive for a pesticide companies to support initial or continuing registration of commercial pesticides. As all agricultural uses of pesticides are regulated by the EPA, each use must be registered or exempted before applied. Such registration is costly, making only registration for uses on any but large acreage crops unprofitable for pesticide companies. The IR-4 Project leverages resources to pursue registration for such uses. Along with supporting the use of reduced-toxicity pesticides, with its Biological and Organic Support program, the IR-4 Project is able to direct necessary resources to meet the U.S. goal of substantially decreasing the environmental and health impacts of agricultural pesticide use following the passage of the Food Quality Protection Act of 1996. This report assesses the economic impact of the IR-4 Project on the U.S. economy. The assessment assumes a long-run presence of the IR-4 Project, such that relevant decision makers recognize and

Steven R. Miller; Andrea Leschewski

2011-01-01T23:59:59.000Z

40

hllGRATOKY NONGAME IllHDS OF IMANAGEMENT CONCERN IN T I E NOXTIIEhST 1 GULL-BILLED TERN  

E-Print Network (OSTI)

hllGRATOKY NONGAME IllHDS OF IMANAGEMENT CONCERN IN T I E NOXTIIEhST 1 GULL-BILLED TERN Sterna, or peach colored, with darker down on the dorsal surfaces. Young usually have nvo dorsal stripes

Duffy, David Cameron

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Combined Welcome and iManage OM Industry Day PP Presentation August 16 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Data iManage Industry Day 2 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data Welcome Presentation Monica Serrano United States Dept of Energy (DOE) HQ Office of Procurement 3 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data All information provided at Industry Day and discussed at the One-on-One sessions is preliminary and subject to change based on the final Acquisition Strategy and Solicitation 4 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data Presentation materials will be distributed hard-copy and will be posted to: DOE Website https://cms.doe.gov/management/office- management/operational- management/procurement-and-acquisition/major-

42

Gradient Projection Methods for Quadratic Programs and ...  

E-Print Network (OSTI)

Jul 30, 2003 ... Gradient Projection Methods for Quadratic Programs and Applications in Training Support Vector Machines. Thomas Serafini (serafini.thomas ...

43

PNNL: Biological Sciences Programs & Projects: FCSD  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Biological & Environmental Research-PNNL Proteomics Center for Systems Biology of EnteroPathogens DOE Genomic Science Program Foundational Scientific Focus Area (FSFA)...

44

Federal Energy Management Program: Project Funding  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More places to share Federal Energy Management Program: Project Funding on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts On-Site...

45

Green Manufacturing Programs/Projects for the Systems ...  

Science Conference Proceedings (OSTI)

Green Manufacturing Programs/Projects for the Systems Integration Division. Production Network Supplier Characterization Project. ...

2011-12-23T23:59:59.000Z

46

Federal Energy Management Program: Project Funding  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Funding Project Funding AFFECT FOA Webinar FEMP hosted a 60-minute informational webinar and question and answer session on the AFFECT FOA on November 12, 2013. Review the webinar slides and transcript. Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings. The Federal Energy Management Program (FEMP) supports Federal agencies identify, obtain, and implement project funding for energy projects through: Energy Savings Performance Contracts ESPC ENABLE Process Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs. Federal agencies can choose the funding options that best fits for their project needs. For an overview of available funding options and strategies, read the FEMP Project Funding Quick Guide.

47

Electronics & Telecommunications Programs and Projects  

Science Conference Proceedings (OSTI)

... nanostructured materials. In the phenomenon … more. Electronic Kilogram Last Updated Date: 06/25/2013 This project ...

2010-09-20T23:59:59.000Z

48

Environmental Monitoring Program Quality Assurance Project Plan  

SciTech Connect

The Quality Assurance Project Plan (QAPP) is intended to document the quality assurance of the Environmental Monitoring Program. The Quality Assurance Project Plan has two parts and is written to become a chapter in the Environmental Monitoring Plan. Part A describes the management responsibilities and activities performed to assure the quality of the Environmental Monitoring Program. Part B covers the documentation requirements for changes in the Monitoring Program, and provides details on control of the design and implementation of quality assurance activities.

Holland, R.C.

1993-06-01T23:59:59.000Z

49

2012 2013 Projected Aviation Program Costs  

E-Print Network (OSTI)

2012 ­ 2013 Projected Aviation Program Costs UND Aerospace offers two aviation degree programs with a total of seven academic majors. Each has its own flight course requirements, which affect the cost of a degree program. BACHELOR of BUSINESS ADMINISTRATION ** Flight Costs Airport Management Survey of Flight

Delene, David J.

50

Program Managers/Project Leaders, Applied Energy Programs, LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

Duncan McBranch (Acting) Duncan McBranch (Acting) 505-667-8597 Office Administrator Becky Fernandez 505-667-3621 Program Manager Karl Jonietz 505-663-5539 Program Manager Melissa Fox 505-663-5538 Budget Analyst Minhua Li 505-667-3568 Listed By Area Biofuels,TBD Carbon Dioxide Separation & Capture, Kathryn Berchtold, Science Project Leader, 505-665-7841, berchtold@lanl.gov Carbon Sequestration, Rajesh Pawar, Science Project Leader, 505-665-6929, rajesh@lanl.gov Energy Storage, Albert Migliori, Science Project Leader, 505-667-2515, migliori@lanl.gov Fuel Cells, Rod Borup, Program Manager, 505-667-2823, borup@lanl.gov Fossil Fuels, Melissa Fox, Program Manager, 505-665-5377, mami@lanl.gov Geothermal Energy , Kenneth Rehfeldt, Science Project Leader, 505-667-3644, krehfeld@lanl.gov Hydrogen Storage & Production, Kevin Ott, Program Manager, 505-667-4600, kcott@lanl.gov

51

2013-2014 Projected Aviation Program Costs  

E-Print Network (OSTI)

06/21/13 2013-2014 Projected Aviation Program Costs UND Aerospace offers two aviation degree the cost of a degree program. BACHELOR of BUSINESS ADMINISTRATION ** Flight Costs Airport Management Survey Certificate $ 11,574 **NOTE: Total flight costs are based on averages and are subject to change. Also, the ATC

Delene, David J.

52

Colorado Natural Heritage Program 2003 Project Abstracts  

E-Print Network (OSTI)

Colorado Natural Heritage Program 2003 Project Abstracts #12;Cover photo: A CNHP researcher. On a good evening, we end on a positive note, and feel lucky that we have the opportunity to work in a field that is so relevant to future generations. As the Colorado Natural Heritage Program continued our quest

53

Short Rotation Woody Crops Program: Project summaries  

DOE Green Energy (OSTI)

This document is a compilation of summaries describing research efforts in the US Department of Energy's Short Rotation Woody Crops Program (SRWCP). The SRWCP is sponsored by DOE's Biofuels and Municipal Waste Technology Division and is field-managed at Oak Ridge National Laboratory. The SRWCP is an integrated basic research program with 18 field research projects throughout the United States. The overall objective of the program is to improve the productivity and increase the cost efficiency of growing and harvesting woody trees and shrubs. In a competitive technical review, 25 projects were chosen to form a new research program. Although some of the original projects have ended and new ones have begun, many of the long-term research projects still form the core of the SRWCP. This document contains individual summaries of each of the 18 research projects in the SRWCP from October 1985 to October 1986. Each summary provides the following information: name and address of the contracting institution, principal investigator, project title, current subcontract or grant number, period of performance, and annual funding through fiscal year 1986. In addition, each summary contains a brief description of the project rationale, objective, approach, status, and future efforts. A list of publications that have resulted from DOE-sponsored research follows many of the summaries.

Not Available

1986-11-01T23:59:59.000Z

54

START Program for Renewable Energy Project Development Assistance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance Education and Training Energy Resource Library Funding...

55

Advanced Research Projects Agency - Energy Program Specific Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Research Projects Agency - Energy Program Specific Recovery Plan Advanced Research Projects Agency - Energy Program Specific Recovery Plan Microsoft Word - 44F1801D.doc...

56

CCEF - Renewable Energy Projects in Pre-Development Program ...  

Open Energy Info (EERE)

Program Incentive Type State Loan Program Applicable Sector Commercial, Renewable energy project developers Eligible Technologies Solar Thermal Electric, Photovoltaics,...

57

Utility stresses environmental programs, research projects  

Science Conference Proceedings (OSTI)

B.C. Hydro, the provincial electric utility of British Columbia, views environmental programs and research projects as an important part of its business. Many of these activities stem from some aspect of hydroelectric generation as the utility relies on 39 reservoirs and 30 hydro stations for the bulk of its electricity production. These programs and research projects are featured in B.C. Hydro's first annual Report on the Environment, which summarizes the utility's work to minimize the effects of operations on the natural and social environment. Some programs and research projects were initiated some years ago, while others are new. B.C.'s environmental programs include environmental audits and fish and wildlife compensation (mitigation) programs. In 1988, the utility and the province's Ministry of Environment, Lands and Parks began developing compensation programs to address water license requirements for B.C. Hydro's hydroelectric developments. Today, compensation programs for the Peace and Columbia river area serve as models for future programs. The utility also reports it is reviewing all operating orders for its water system to identify opportunities to make operations more sensitive to environmental concerns. Additionally, work is under way on a preliminary strategy for addressing fish and water quality issues and setting minimum flow requirements. And in an effort to control dust storms, B.C. Hydro reports it is studying native perennial plants that can endure the flooding/drawdown cycle typical of a water storage reservoir.

Not Available

1993-02-01T23:59:59.000Z

58

Federal Energy Management Program: Technical and Project Assistance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program Areas: FEMP core programs focused on helping Federal agencies evaluate and deploy energy management, savings, and generation projects. FEMP Technology Programs: FEMP core...

59

Environment/Climate Programs/Projects in PML  

Science Conference Proceedings (OSTI)

Environment/Climate Programs/Projects in PML. Aperture area measurements. Applied spectroradiometry and imaging metrology. ...

2010-10-05T23:59:59.000Z

60

Homeland Security Programs/Projects for the Intelligent ...  

Science Conference Proceedings (OSTI)

Homeland Security Programs/Projects for the Intelligent Systems Division. Department of Homeland Security Urban Search ...

2011-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Federal Energy Management Program: Renewable Energy Project Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Assistance to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Assistance on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Assistance on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Assistance on Google Bookmark Federal Energy Management Program: Renewable Energy Project Assistance on Delicious Rank Federal Energy Management Program: Renewable Energy Project Assistance on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Assistance on AddThis.com... Energy-Efficient Products Technology Deployment Renewable Energy Federal Requirements Renewable Resources & Technologies Project Planning & Implementation

62

Federal Energy Management Program: Renewable Energy Project Planning and  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

63

Technical Standards, Program Project Justification Statement - August 29,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Project Justification Statement - Program Project Justification Statement - August 29, 2012 Technical Standards, Program Project Justification Statement - August 29, 2012 August 29, 2012 DOE Technical Standards Program Project Justification Statement As part of the new justification process for developing or revising DOE Technical Standards, organizations, people are asked to provide the listed information (in numeric format) in a Project Justification Statement (PJS) prior to submitting the requisite Project Registration and Approval Request form (F 1300.5). Technical Standards, Program Project Justification Statement More Documents & Publications DOE-TSPP-2-2013, Initiating DOE Technical Standards Active Project Justification Statement DOE-TSPP-7-2013, Maintaining DOE Technical Standards

64

Federal Energy Management Program: Recovery Act Project Stories  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Stories to someone by E-mail Project Stories to someone by E-mail Share Federal Energy Management Program: Recovery Act Project Stories on Facebook Tweet about Federal Energy Management Program: Recovery Act Project Stories on Twitter Bookmark Federal Energy Management Program: Recovery Act Project Stories on Google Bookmark Federal Energy Management Program: Recovery Act Project Stories on Delicious Rank Federal Energy Management Program: Recovery Act Project Stories on Digg Find More places to share Federal Energy Management Program: Recovery Act Project Stories on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs Recovery Act Technical Assistance Projects Project Stories Recovery Act Project Stories

65

Federal Energy Management Program: Technical and Project Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical and Technical and Project Assistance to someone by E-mail Share Federal Energy Management Program: Technical and Project Assistance on Facebook Tweet about Federal Energy Management Program: Technical and Project Assistance on Twitter Bookmark Federal Energy Management Program: Technical and Project Assistance on Google Bookmark Federal Energy Management Program: Technical and Project Assistance on Delicious Rank Federal Energy Management Program: Technical and Project Assistance on Digg Find More places to share Federal Energy Management Program: Technical and Project Assistance on AddThis.com... Project Assistance Call for Projects Training Outreach Technical and Project Assistance The Federal Energy Management Program's (FEMP) offers technical and project assistance to help Federal agencies successfully implement energy- and

66

Appendix 7 - Stripes Architecture Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Name: Department of Energy iManage Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page i 8/30/2012 U.S. Department of Energy Office of the Chief Financial Officer iManage Strategic Integrated Procurement Enterprise System STRIPES Technical Architecture Overview Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page ii 8/30/2012 Title Page Document Name: Strategic Integrated Procurement Enterprise System (STRIPES) Technical Architecture Overview

67

Federal Energy Management Program: Diversifying Project Portfolios for  

NLE Websites -- All DOE Office Websites (Extended Search)

Diversifying Diversifying Project Portfolios for Utility Energy Service Contracts to someone by E-mail Share Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Facebook Tweet about Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Twitter Bookmark Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Google Bookmark Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Delicious Rank Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Digg Find More places to share Federal Energy Management Program:

68

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT & ADMINISTRATION - STRIPES * Template - January 30,2009, Version 2 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. Module I - Privacy Needs Assessment Date Departmental Element & Site Name of Information System or IT Project Exhibit Project UIO April 21, 2009 Office of the Chief Financial Officer, Office of Corporate Information Systems, CF-40 Germantown, U.S. Department of Energy, DOE Headquarters, Germantown, hosted in the OCIO's Application Hosting Environment (AHE) in the CA-007 server

69

Electrical Quantities Programs/Projects in Quantum Electrical ...  

Science Conference Proceedings (OSTI)

Electrical Quantities Programs/Projects in Quantum Electrical Metrology. Electric Power Metrology and the Smart Grid. Contact. ...

2011-10-03T23:59:59.000Z

70

Sensors Programs/Projects in Quantum Electrical Metrology  

Science Conference Proceedings (OSTI)

Sensors Programs/Projects. Advanced Magnetic and Quantum Materials. Fiber Sources and Applications. High-Speed Measurements. ...

2011-10-24T23:59:59.000Z

71

Public Safety/Security Programs/Projects in PML  

Science Conference Proceedings (OSTI)

Public Safety/Security Programs/Projects in PML. Biomagnetic Imaging Standards and Microsystems. Calibration of Beta ...

2010-10-05T23:59:59.000Z

72

Clean Coal Technology Programs: Completed Projects (Volume 2)  

Science Conference Proceedings (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2003-12-01T23:59:59.000Z

73

Federal Energy Management Program: Large-scale Renewable Energy Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Large-scale Large-scale Renewable Energy Projects (Larger than 10 MWs) to someone by E-mail Share Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Facebook Tweet about Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Twitter Bookmark Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Google Bookmark Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Delicious Rank Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Digg Find More places to share Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on

74

Federal Energy Management Program: FDA Construction Project Serves as a  

NLE Websites -- All DOE Office Websites (Extended Search)

FDA Construction FDA Construction Project Serves as a Super ESPC Model to someone by E-mail Share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Facebook Tweet about Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Twitter Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Google Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Delicious Rank Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Digg Find More places to share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on AddThis.com... Energy Savings Performance Contracts

75

Delaware Greenhouse Gas Reduction Projects Grant Program (Delaware) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greenhouse Gas Reduction Projects Grant Program (Delaware) Greenhouse Gas Reduction Projects Grant Program (Delaware) Delaware Greenhouse Gas Reduction Projects Grant Program (Delaware) < Back Eligibility Agricultural Commercial Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Wind Program Info Funding Source Greenhouse Gas Reduction Projects Fund State Delaware Program Type Grant Program Provider Delaware Department of Natural Resources and Environmental Control The Delaware Greenhouse Gas Reduction Projects Grant Program is funded by the Greenhouse Gas Reduction Projects Fund, established by the Act to Amend Title 7 of the Delaware Code Relating to a Regional Greenhouse Gas

76

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

77

Aerogel commercialization pilot project. Final program report  

Science Conference Proceedings (OSTI)

Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

NONE

1996-02-13T23:59:59.000Z

78

START Program for Renewable Energy Project Development Assistance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program for Renewable Energy Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through the START Program for Renewable Energy Project Development Assistance, a team of DOE and national laboratory experts will work directly with tribal communities to evaluate project financial and technical feasibility, provide on-going training to community members, and help implement a variety of clean energy projects, including energy storage infrastructure, renewable energy deployment, and energy efficiency. The following projects were selected for the 2013 START Renewable Energy

79

DOE Commercial Building Partnership Program - LBNL Project Introductio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program - LBNL Project Introductions (Includes brief update on Commercial Buildings User Facility & other items) NOTICE Due to the current lapse of federal funding, Berkeley...

80

Federal Energy Management Program: FDA Construction Project Serves...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program: FDA Construction Project Serves as a Super ESPC Model on AddThis.com... Energy Savings Performance Contracts Assistance & Contacts Resources Laws & Regulations...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Rural Enterprise Assistance Project's Loan Program (Nebraska) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enterprise Assistance Project's Loan Program (Nebraska) Enterprise Assistance Project&#039;s Loan Program (Nebraska) Rural Enterprise Assistance Project's Loan Program (Nebraska) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Loan Program Provider Center for Rural Affairs The Rural Enterprise Assistance Project (REAP) offers four services: financing (micro loans), business training, technical assistance, and networking. REAP's Loan Program focuses on providing capital for rural start-up and existing businesses. Among the loan program are the Direct Loan product, offering loans up to $50,000, and the Rapid Loan product, offering loans up to $10,000, and the Quick GROW Loan, offering loans

82

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Commission DC Direct Current DUA Distributed Utility Associates EPRI Electric Public ResearchPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT SITRAS® STATIC ENERGY STORAGE (SES) SYSTEM DEMONSTRATION PROGRAM Prepared for: California Energy Commission Prepared by

83

AEP Ohio - Commercial Custom Project Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Commercial Custom Project Rebate Program - Commercial Custom Project Rebate Program AEP Ohio - Commercial Custom Project Rebate Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Tribal Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate 50% of cost up to $300,000/project $600,000/year Sliding scale incentive reduction when calculated incentive exceeds $160,000/project. Program Info State Ohio Program Type Utility Rebate Program Rebate Amount 0.08/kWh (for one year energy savings) plus 100/kW AEP's demand reduction (at summer peak) Provider AEP Ohio AEP Ohio offers commercial customers incentives to upgrade inefficient

84

Renewable Energy Project Bond Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Bond Program Project Bond Program Renewable Energy Project Bond Program < Back Eligibility Commercial Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Idaho Program Type State Bond Program Provider Idaho Energy Resources Authority Legislation enacted in Idaho in April 2005 ([http://legislature.idaho.gov/legislation/2005/S1192.html Senate Bill 1192]) allows independent (non-utility) developers of renewable energy projects in the state to request financing from the Idaho Energy Resources Authority, a state bonding authority created in March 2005 by the Environment, Energy and Technology Energy Resources Authority Act (House Bill 106). The authority was created to finance the construction of

85

ORAU Science Education Program (SEP) Global Change Education Program (GCEP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORAU Science Education Program (SEP) Global Change Education ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management MOX Services Unclassified Information System PIA, National Nuclear Services Administration E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory

86

Federal Energy Management Program: Call for Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

FEMP issues calls for projects surrounding energy efficiency, renewable energy, and water conservation. On July 9, 2013, FEMP issued a notice of intent on the EERE Exchange...

87

Quantum Electrical Measurements Programs and Projects  

Science Conference Proceedings (OSTI)

... This project provides the basis for a new definition of mass, based on ... Energy Determination of X-Ray Transition Energies Using the NIST TES ...

2010-05-24T23:59:59.000Z

88

Federal Energy Management Program: Call for Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

at Federal agency facilities. Key Details Direct funding will be provided for combined heat and power and renewable energy projects. The anticipated funding level per award is up...

89

Federal Energy Management Program: Project Facilitation  

NLE Websites -- All DOE Office Websites (Extended Search)

support, and commitment to project goals Kickoff meeting support Interagency agreement Audit Review and Master Agreement Development The audit review and master agreement...

90

Federal Energy Management Program: ESPC ENABLE Project Assistance and  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Assistance and Training Project Assistance and Training ESPC ENABLE Training To learn how to use ESPC ENABLE, take the Streamlining ESPCs for Small Sites First Thursday Seminar on demand. The Federal Energy Management Program (FEMP) offers project assistance and training to help Federal agencies implement Energy Savings Performance Contracts (ESPC) ENABLE projects. Project Assistance Through FY2014, project assistance from FEMP is cost-free and may include project management as well as technical support from experienced project facilitators and procurement staff. General Services Administration (GSA) contracting staff are also available to answer questions regarding the GSA Federal Supply Schedule 84, SIN 246-53. To learn more about one-on-one project assistance for your ESPC ENABLE project, contact Evan Fuka at 202-406-4107.

91

Geothermal Reservoir Technology Research Program: Abstracts of selected research projects  

DOE Green Energy (OSTI)

Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

Reed, M.J. (ed.)

1993-03-01T23:59:59.000Z

92

Current projects - Nuclear Data Program, Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Projects Current Projects Nuclear Data Program Overview Current Projects & Recent Activities Collaborating Organizations Publications Nuclear Data Measurements (NDM) Reports Experimental Nuclear Data Resources Contact ND Program Related Resources Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Data Program Current Projects Bookmark and Share Compilation and evaluation of nuclear structure and decay data for the IAEA coordinated International Nuclear Structure and Decay Data Network. Argonne Nuclear Data Program has the responsibility for evaluations of A=176-179 & 199-209 mass chains. These evaluations are included in the world most completed and comprehensive nuclear structure

93

A polynomial projection algorithm for linear programming  

E-Print Network (OSTI)

Jul 5, 2013 ... Abstract: We propose a polynomial algorithm for linear programming. The algorithm represents a linear optimization or decision problem in the ...

94

Federal Assistance Program/Project Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

suggestions for reducing this burden, to Office of Information Resources Management, AD-241.2 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000...

95

Program & Project Management For The Acquisition Of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 2009 Office of Management Office of Engineering and Construction Management Operational Organization Chart (FY 09) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Peter O'Konski Director for Facilities Management & Professional Development

96

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

97

Renewable Energy Project Bond Program (Idaho) | Open Energy Informatio...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Renewable Energy Project Bond Program (Idaho) This is the approved revision of this page, as well as being the most recent. Jump...

98

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT AFFORDABLE MULTIFAMILY ZERO ENERGY NEW HOMES Prepared for: California Energy Commission Prepared by: Global Global Green USA Santa Monica, CA 90405 Contract Number: 500-04-023 Prepared for: California Energy

99

Geothermal Energy Research and Development Program; Project Summaries  

Science Conference Proceedings (OSTI)

This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

None

1994-03-01T23:59:59.000Z

100

Think City Electric Vehicle Democstration Program Final Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

7182005 AWARD DE-FG26-O1ID14048 THNK city ELECTRIC VEHICLE DEMONSTRATION PROGRAM FINAL PROJECT REPORT June 2005 Ford Motor Company Sustainable Mobility Technologies 2 7182005...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Colorado State Capitol Building Geothermal Program Geothermal Project |  

Open Energy Info (EERE)

State Capitol Building Geothermal Program Geothermal Project State Capitol Building Geothermal Program Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Colorado State Capitol Building Geothermal Program Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description This building is approximately 100 years old, and much of the building is heated with expensive district steam and lacks sufficient central cooling. The requested funding pertains to Topic Area 1 Technology Demonstration Projects. Funding would be used for Phase I - Feasibility Study and Engineering Design, Phase II - Installation and Commissioning of Equipment, and Phase III - Operation, Data Collection, and Marketing. Geothermal energy provided by an open-loop ground source heat pump system and upgrades to the building HVAC systems will reduce consumption of electricity and utility steam created with natural gas. Additionally, comfort, operations and maintenance, and air quality will be improved as a result. It is anticipated that the open loop GHP system will require a 500-650 gpm water flow rate.

102

DOE passive solar commercial buildings program: project summaries  

DOE Green Energy (OSTI)

The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

Not Available

1982-01-01T23:59:59.000Z

103

Review of the Regional Biomass Energy Program: Technical projects  

Science Conference Proceedings (OSTI)

This article summarizes technical projects of the regional Biomass Energy Program. Projects included are as follows: economic impact studies for renewable energy resources; alternative liquid fuels; Wood pellets fuels forum; residential fuel wood consumption; waste to energy decision-makers guide; fuel assessment for cogeneration facilities; municipal solid waste combustion characteristics.

Lusk, P.

1994-12-31T23:59:59.000Z

104

Microsoft Word - OMB_300_CF iManage _Rev 11_ 9-17-2009.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 300: Capital Asset Plan and Business Case Summary Exhibit 300: Capital Asset Plan and Business Case Summary Part I: Summary Information And Justification (All Capital Assets) Section A: Overview (All Capital Assets) 1. Date of Submission: 2. Agency: 3. Bureau: 4. Name of this Investment: 5. Unique Project (Investment) Identifier: (For IT investment only, see section 53.9. For all other, use agency ID system.) 6. What kind of investment will this be in FY 2011? (Please NOTE: Investments moving to O&M in FY 2011, with Planning/Acquisition activities prior to FY 2011 should not select O&M. These investments should indicate their current status.) 7. What was the first budget year this investment was submitted to OMB? 8. Provide a brief summary and justification for this investment, including a brief description of how this closes in part or in

105

West Valley Demonstration Project Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 7 Hazards Survey and Hazards Assessment .................................... 7 Program Plans and Procedures ..................................................... 8 Emergency Responder Performance .......................................... 10 Feedback and Continuous Improvement....................................

106

Program & Project Management For The Acquisition Of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 3, 2011 February 3, 2011 Operational Organization Chart (FY 11) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst (on detail) Rosalyn Matthews - Program Support Specialist EIR Program Analyst (IBM) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Paul Bosco Director Real Estate Tom Geronikos - Realty Spec Mark Price - Realty Spec David Steinau - Realty Spec Project Management James Fountain - Prog Analyst John Makepeace - Prog Analyst Cynthia Seiter - Prog Analyst Project Mgt Assessment Mike Peek - Gen Engr Tom Bruder- Gen Engr Brian Huizenga - Gen Engr Rick Elliott -- Gen Engr

107

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

108

FY 1974 program plan for geothermal project  

SciTech Connect

The Program Plan specifies the basic plan for the utilization of FY-74 funds allocated by the AEC Division of Applied Technology and contributions from other participants for the development of geothermal energy in southern Idaho. Funding priorities are dictated by the Construction Data Package submission deadline and the October 1, 1974, site selection. Tasks not funded during FY-74 will be pursued during FY-75. (auth)

1974-02-05T23:59:59.000Z

109

Site Programs & Cooperative Agreements: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration West Valley Demonstration Project Site Programs & Cooperative Agreements: West Valley Demonstration Project West Valley Demonstration Project The Seneca Nation of Indians has interests and concerns regarding the West Valley Demonstration Project Site. Like at Hanford, DOE environmental cleanup activities have the potential to impact natural and cultural resources and to interfere with American Indian religious practices. Through a cooperative agreement, tribal staff is engaged on a frequent basis with DOE and its contractors. The principle activities engaged by tribes include reviewing and commenting on plans and documents, participating in meetings at the request of DOE, monitoring cultural resource sites, participating in site surveys, and identifying issues that

110

Federal Energy Management Program: Technical and Project Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical and Project Assistance Technical and Project Assistance The Federal Energy Management Program's (FEMP) offers technical and project assistance to help Federal agencies successfully implement energy- and water-efficiency projects. Call for Projects: Look up current FEMP project opportunities. Working with DOE National Laboratories: Learn about working with the U.S. Department of Energy's (DOE) national laboratories through FEMP technical services and work-for-others agreements. Sell Energy-Efficient Products: Read about resources available to vendors interested in doing business with the Federal Government. GSA Schedules: Look up more commercial products and services at volume discount pricing arranged by the U.S. General Services Administration (GSA). For more information about FEMP, see:

111

Programming Language Abstractions for  

E-Print Network (OSTI)

the ready availability of information on who currently owns what rights in what land. (i)Management of State

Zenger, Matthias

112

Initiatives for proliferation prevention program : goals, projects, and opportunities  

SciTech Connect

The mission of the U.S. Department of Energy Initiatives for Proliferation Prevention (IPP) Program is to identify and create commercial opportunities for former weapons scientists currently or formerly involved with weapons of mass destruction in the Former Soviet Union (FSU). IPP was first authorized in Fiscal Year 1994 under Section 575 of Public Law 103-87. IPP currently sponsors 164 projects in Russian at 64 institutes; 16 projects in the Ukraine at 14 institutes; 14 projects in Kazakhstan at 10 institutes; and one project in Belarus. To date, the IPP program has engaged over 10,000 experts in the areas of nuclear, chemical, and biological weapons and missile development at more than 170 institutes in Russia, Kazakhstan, Ukraine, and Belarus.

Hemberger, P. H. (Philip H.)

2001-01-01T23:59:59.000Z

113

NEPA COMPLIANCE SURVEY Project Information Project TitJe: Geothermal Technologies Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Information Project TitJe: Geothermal Technologies Program Date: 12-11-()9 DOE Code: 6730.020.61041 Contractor Code: Project Lead: Project Overview This NEPA is for the laying of a 2,975 foot, 8" welded plastic water line from Little Teapot Creek near in the 1. What are the environmental impacts? intersection with Teapot Creek to the North Waterflood Facility (NWF) building. The entire project area is within Section 21 T39N R78W (map attached) and will not impact any wet land areas but will cross one 2. What is the legal location? intermittent stream. The stream is presently dry. The project will include the clearing of vegetation from a 12 3. What is the duration of the project? foot wide construction corridor along the route, digging a 5 foot deep trench, welding and placing the plastic

114

Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).  

DOE Green Energy (OSTI)

The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed to maximize program benefits and address limiting factors.

Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

2009-07-27T23:59:59.000Z

115

Uniform Methods Project for Determining Energy Efficiency Program Savings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Determining Energy Efficiency Program for Determining Energy Efficiency Program Savings Uniform Methods Project for Determining Energy Efficiency Program Savings Under the Uniform Methods Project, DOE is developing a framework and a set of protocols for determining the energy savings from specific energy efficiency measures and programs. The protocols provide a straightforward method for evaluating gross energy savings for common residential and commercial measures offered in ratepayer-funded initiatives in the United Sates. They represent a refinement of the body of knowledge supporting energy efficiency evaluation, measurement, and verification (EM&V) activities. They have been written by technical experts within the field and reviewed by industry experts. Read the first set of protocols published April 2013.

116

Materials Development Program: Ceramic Technology Project bibliography, 1984--1992  

DOE Green Energy (OSTI)

The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

Not Available

1994-03-01T23:59:59.000Z

117

Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan  

SciTech Connect

The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented.

Randklev, E.H.

1993-06-01T23:59:59.000Z

118

Radiation Protection Program Resource Optimization Project; Brunswick Nuclear Plant  

Science Conference Proceedings (OSTI)

Radiation protection (RP) managers face challenges in providing a necessary service that complies with stringent regulations, while simultaneously reducing operations and maintenance (O&M) costs. The results of this pilot project, hosted by Brunswick Nuclear Plant (BNP), will assist utilities in targeting resource commitments and cost effectiveness while optimizing overall performance. This report identifies specific program cost reduction and process performance enhancements for the host plant, and esta...

2002-11-18T23:59:59.000Z

119

Stockpile Transition Enabling Program (STEP): Process and project requirements  

Science Conference Proceedings (OSTI)

The Stockpile Transition Enabling Program (STEP) is aimed at identifying weapon components suitable for use in more than one weapon and for qualifying components so identified for multiple use. Work includes identifying the means to maintain the manufacturing capability for these items. This document provides the participants in STEP a common, consistent understanding of the process and requirements. The STEP objectives are presented and the activities are outlined. The STEP project selections are based on the customer needs, product applicability, and maturity of the technology used. A formal project selection process is described and the selection criteria are defined. The concept of {open_quotes}production readiness{close_quotes} is introduced, along with a summary of the project requirements and deliverables to demonstrate production readiness.

Ma, Kwok Kee

1993-06-01T23:59:59.000Z

120

NETL: News Release - SECA Fuel Cell Program Selects Two Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2008 9, 2008 SECA Fuel Cell Program Selects Two Projects Low-Cost Fuel Cell Systems to Address Energy Security, Climate and Water Challenges WASHINGTON, DC - The U.S. Department of Energy (DOE) has selected two projects for the Department's Solid State Energy Conversion Alliance (SECA) Program portfolio. The projects, focused on enhancing energy security through zero-emission applications, will be led by UTC Power, a United Technologies Corporation, in partnership with Delphi Corporation, and Rolls-Royce Fuel Cell Systems (U.S.) Inc. The Rolls-Royce project will include work at Ohio's Stark State College Fuel Cell Prototyping Center, which is also supported through a National Science Foundation grant. From an environmental perspective, fuel cells are one of the most attractive technologies for generating electricity. Solid oxide fuel cells operate by separating and transferring oxygen across a solid electrolyte membrane, where it reacts with a fuel - such as synthesis gas derived from coal, biofuels or natural gas - to produce steam and carbon dioxide (CO2). Condensing the steam results in a pure stream of CO2 gas; this can be readily captured for storage or other use in a central location. This feature, coupled with the well-known fact that fuel cell efficiency does not depend on high temperatures, results in near-zero emissions (e.g., NOx < 0.5ppm) at equivalent or reduced cost-of-electricity compared to today's power generation.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

122

Low Dose Radiation Research Program: DOE / NASA Joint Funded Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/NASA Joint Funded Projects DOE/NASA Joint Funded Projects NASA Source Photo Space explorers are subject to exposure to low dose ionizing radiation. Research that helps determine health risks from this exposure is funded by NASA and DOE. Source: NASA DOE's Low Dose Program and the National Aeronautics and Space Administration (NASA) jointly fund new research to develop a better scientific basis for understanding risks to humans from exposures to low doses or low fluences of ionizing radiation. Research must focus on elucidating molecular mechanisms and pathways involved in normal radiobiological responses to low dose exposure, and must have the potential to ultimately increase understanding of health outcomes from radiation exposures that are at or near current workplace exposure

123

Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3  

SciTech Connect

The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

Enertech Consultants

1996-04-01T23:59:59.000Z

124

Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project  

Science Conference Proceedings (OSTI)

This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

1988-03-01T23:59:59.000Z

125

FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERTIFICATION FOR PROGRAM AND PROJECT CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) EXECUTIVE SUMMARY 1. Purpose. The Federal Acquisition Certification for Program and Project Managers (FAC-P/PM) establishes general training and experience requirements for program and project managers in civilian agencies. The FAC- P/PM focuses on essential competencies needed for program and project managers; the program does not include functional or technical competencies, such as those for information technology, or agency- specific competencies. 2. Background. The quality and effectiveness of the federal acquisition process depend on the development of a capable and competent workforce. The Services Acquisition Reform Act of 2003 (SARA, P.L. 108-136) expanded the definition of acquisition to include functions performed by program and project managers.

126

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

SciTech Connect

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

1976-04-01T23:59:59.000Z

127

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

DOE Green Energy (OSTI)

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

Not Available

1976-04-01T23:59:59.000Z

128

Sensors and Controls Program and Project Review: May 21-22, 2013 ...  

... Energy Innovation Portal on Facebook; Tweet about Sensors and Controls Program and Project Review: May 21-22, 2013 - Energy Innovation Portal on Twitter ...

129

DOE G 413.3-3, Safeguards and Security for Program and Project Management  

Directives, Delegations, and Requirements

This Guide provides approaches for implementing security provisions within the functional areas contained in DOE O 413.3A, Program and Project Management for ...

2007-11-15T23:59:59.000Z

130

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

DOE Green Energy (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

131

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

DOE Green Energy (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

132

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

a three-year job training program; this isn’t: you stay herehow much of it was a training program. So when Cal-Works’dialogue between the training program and the sustainable

Reti, Irene H.

2010-01-01T23:59:59.000Z

133

Market Data for Renewable Energy Projects and Programs at NREL | Open  

Open Energy Info (EERE)

for Renewable Energy Projects and Programs at NREL for Renewable Energy Projects and Programs at NREL Jump to: navigation, search Logo: Market Data for Renewable Energy Projects and Programs at NREL Name Market Data for Renewable Energy Projects and Programs at NREL Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Topics Market analysis Resource Type Dataset, Guide/manual Website http://www.nrel.gov/analysis/r References Market Data for Renewable Energy Projects and Programs at NREL[1] Abstract This Web page includes market data for renewable energy technologies and programs, presented in individual reports for each area. Data includes market penetration; industry trends; cost, price, and performance trends; policy and market drivers; as well as future outlook. Overview

134

DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Approp. FY 2006 R&D Participants National Labs Universities 24% Auto OEM s Other Industry Suppliers, Technology Develolpers 24% Energy Companies Program Evaluation Annual Program...

135

Federal Energy Management Program: Renewable Energy Project Assistance  

NLE Websites -- All DOE Office Websites (Extended Search)

Assistance Assistance Call for Projects FEMP recently issued a notice of intent to release a Funding Opportunity Announcement (FOA) that will provide grants to develop renewable energy projects. Read the call for projects. See box below for information on project assistance for this upcoming FOA. Request to Receive Project Assistance from FEMP Federal agencies interested in receiving FEMP project assistance must complete the renewable energy project assistance request form and email it to Boyan Kovacic. Applications will be processed on a weekly basis. For technical assistance on the upcoming FEMP FOA "Assisting Federal Facilities with Energy Conservation Technologies" (AFFECT), agencies must submit a letter stating their need for assistance and their intent to apply for the FOA in addition to completing the renewable energy project assistance request form.

136

Federal Energy Management Program: Renewable Energy Project Planning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning and Implementation Federal renewable energy projects can be large or small and managed by a third-party or the agency. Typically, large-scale projects-larger than 10...

137

NREL: Education Programs - Wind for Schools Project Gains Traction...  

NLE Websites -- All DOE Office Websites (Extended Search)

January 29, 2013 Pennsylvania is one area where the U.S. Department of Energy Wind Powering America Wind for Schools project is seeing big impact thanks to several projects...

138

Geothermal project summaries. Geothermal energy research, development and demonstration program  

DOE Green Energy (OSTI)

Summaries of all Division of Geothermal Energy supported projects for which contracts have been executed are compiled. Each summary includes pertinent statistical data for that project and an abstract summarizing the project plans and accomplishments. The projects summarized fall into six categories: engineering research and development, resource exploration and assessment, hydrothermal technology applications, advanced technology applications, utilization experiments, and environmental control and institutional studies. (MHR)

Not Available

1976-09-01T23:59:59.000Z

139

Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2  

SciTech Connect

This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

Hall, L.R.

1995-05-30T23:59:59.000Z

140

Carbon Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program:  

Open Energy Info (EERE)

Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Closing Long-Term CO2 Geological Storage Gaps Relevant to Regulatory and Policy Development Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carbon Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Closing Long-Term CO2 Geological Storage Gaps Relevant to Regulatory and Policy Development Focus Area: Clean Fossil Energy Topics: System & Application Design Website: www.sciencedirect.com/science?_ob=MiamiImageURL&_cid=277910&_user=10&_ Equivalent URI: cleanenergysolutions.org/content/carbon-dioxide-co2-capture-project-ph Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation This paper describes results of Phase 2 of the Storage Program of the

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Canadian Atlantic Storms Program: The Meteorological Field Project  

Science Conference Proceedings (OSTI)

The field phase of the Canadian Atlantic Storms Program (CASP) was conducted from 15 January to 15 March 1986. The principal objective of the meteorological component of the program was to begin the process of improving the understanding and ...

R. E. Stewart; G. A. Isaac; R. W. Shaw

1987-04-01T23:59:59.000Z

142

Weatherization Innovation Pilot Program: Program Overview and Philadelphia Project Highlight (Fact Sheet)  

Science Conference Proceedings (OSTI)

Case Study with WIPP program overview, information regarding eligibility, and successes from Pennsylvania's Commission on Economic Opportunity (CEO) that demonstrate innovative approaches that maximize the benefit of the program. The Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) recently launched the Weatherization Innovation Pilot Program (WIPP) to accelerate innovations in whole-house weatherization and advance DOE's goal of increasing the energy efficiency and health and safety of homes of low-income families. Since 2010, WIPP has helped weatherization service providers as well as new and nontraditional partners leverage non-federal financial resources to supplement federal grants, saving taxpayer money. WIPP complements the Weatherization Assistance program (WAP), which operates nation-wide, in U.S. territories and in three Native American tribes. 16 grantees are implementing weatherization innovation projects using experimental approaches to find new and better ways to weatherize homes. They are using approaches such as: (1) Financial tools - by understanding a diverse range of financing mechanisms, grantees can maximize the impact of the federal grant dollars while providing high-quality work and benefits to eligible low-income clients; (2) Green and healthy homes - in addition to helping families reduce their energy costs, grantees can protect their health and safety. Two WIPP projects (Connecticut and Maryland) will augment standard weatherization services with a comprehensive green and healthy homes approach; (3) New technologies and techniques - following the model of continuous improvement in weatherization, WIPP grantees will continue to use new and better technologies and techniques to improve the quality of work; (4) Residential energy behavior change - Two grantees are rigorously testing home energy monitors (HEMs) that display energy used in kilowatt-hours, allowing residents to monitor and reduce their energy use, and another is examining best-practices for mobile home energy efficiency; (5) Workforce development and volunteers - with a goal of creating a self-sustaining weatherization model that does not require future federal investment, three grantees are adapting business models successful in other sectors of the home performance business to perform weatherization work. Youthbuild is training youth to perform home energy upgrades to eligible clients and Habitat for Humanity is developing a model for how to incorporate volunteer labor in home weatherization. These innovative approaches will improve key weatherization outcomes, such as: Increasing the total number of homes that are weatherized; Reducing the weatherization cost per home; Increasing the energy savings in each weatherized home; Increasing the number of weatherization jobs created and retained; and Reducing greenhouse gas emissions.

Not Available

2012-01-01T23:59:59.000Z

143

NREL: Education Programs - Wind for Schools Project Funding Case Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind for Schools Project Funding Case Studies Wind for Schools Project Funding Case Studies August 26, 2013 The Wind for Schools project is part of the U.S. Department of Energy's (DOE's) Wind Powering America initiative. Since 2005, DOE provided funding for Wind Applications Centers in 11 Wind for Schools states, introducing teachers, students, and communities to wind energy applications and benefits. This Wind for Schools funding supported the project; it was not used to purchase turbines and equipment. Individual school champions emerged to find local funding mechanisms to purchase and install their turbines. On October 1, 2013, DOE will no longer fund the project; therefore, we feel that it is important to document the funding sources utilized by these states to purchase and install Wind for Schools project turbines. (1) By

144

Federal Energy Management Program: Renewable Energy Project Assistance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

not receive funding directly. Funding will be provided directly by the U.S. Department of Energy (DOE) to its national laboratories and contractors to provide project assistance....

145

FY2010 2018 Fish and Wildlife Program Project Solicitation  

E-Print Network (OSTI)

Huang ­ IREQ Doug McLaughlin ­ Southern Co. Sharma Kolluri ­ Entergy Dede Subakti ­ CAISO #12;ii Project

146

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

project, and learning a lot about compost and reallybeing excited about compost and how it worked in ourDavidson was working with compost and working with getting

Reti, Irene H.

2010-01-01T23:59:59.000Z

147

Program and Project Management for the Acquisition of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE))

This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental...

148

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

receiving terminal in Baja California, Mexico. Based on these scenarios, the projected penetration of LNG in the South Coast Air Basin and maximum capacity at the EnergĂ­a Costa Azul LNG terminal of 950 million cubic LIST OF TABLES Table ES1: Parameters for the Eight Realistic LNG Scenarios Projected for the Year 2023

149

SECA Fuel Cell Program Moves Two Key Projects Into Next Phase | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECA Fuel Cell Program Moves Two Key Projects Into Next Phase SECA Fuel Cell Program Moves Two Key Projects Into Next Phase SECA Fuel Cell Program Moves Two Key Projects Into Next Phase February 5, 2009 - 12:00pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) has selected two projects for continuation within the Department's Solid State Energy Conversion Alliance (SECA) Program research portfolio. The projects--led by FuelCell Energy, in partnership with VersaPower Systems, and Siemens Energy--have successfully demonstrated solid oxide fuel cells (SOFCs) designed for aggregation and use in coal-fueled central power generation. Further development of these low-cost, near-zero emission fuel cell systems will substantially contribute to solving the Nation's energy security, climate, and water challenges.

150

Project Listings by State, DOE Hydrogen Program FY 2010 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2010 Annual Progress Report DOE Hydrogen Program Alabama V.B.2 CFD Research Corp.: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 V.B.2 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 Alaska VIII.9 Tanadgusix Foundation: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 TDX Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 Alaska Center for Energy and Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . 1288

151

Advanced Seismic data Analysis Program (The "Hot Pot Project")  

Open Energy Info (EERE)

data Analysis Program (The "Hot Pot Project") data Analysis Program (The "Hot Pot Project") Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Advanced Seismic data Analysis Program (The "Hot Pot Project") Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Validation of Innovative Exploration Technologies Project Description The proposed exploration surveys, drilling programs, data analysis and report generation will require 18 months to complete. It is anticipated that the resource confirmation drilling program will be successful in intersecting structural targets predicted by the 2.5-D advanced seismic analysis and model construction, effectively validating use of this innovative technology as a means to reduce drilling risk through improved well targeting. Oski expects that temporary field jobs will be created during the drilling stage and that long-term direct and indirect jobs would be created once this geothermal resource is proven and a geothermal plant is designed, financed and built.

152

Program Managers and Project Officers | Scientific and Technical...  

Office of Scientific and Technical Information (OSTI)

individual designated by the program manager and whose assigned responsibilities include developing the programmatic aspects of a proposed announcement, participating in the...

153

Geothermal R&D Program Summary, FY 1988 Project Sheets  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE - 2005)

1988-10-18T23:59:59.000Z

154

Northeast Oregon Hatchery Program Grande Ronde Â… Imnaha Spring Chinook Hatchery Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Oregon Hatchery Program Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Final Environmental Impact Statement Bonneville Power Administration July 2004 Northeast Oregon Hatchery Program -- Grande Ronde-Imnaha Spring Chinook Project i Table of Contents Page Chapter 1: Updated Summary and Project Description 1.1 Introduction..............................................................................................................1-1 1.2 Purpose and Need for the Proposed Action .............................................................1-2 1.3 Decisions to be Made and Responsible Officials ....................................................1-3 1.4 Summary of Public Involvement, Consultation, and Coordination.........................1-3

155

Low Dose Radiation Research Program: Funded Project Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Funded Project Descriptions Funded Project Descriptions Non-Invasive Early Detection and Molecular Analysis of Low X-Ray Dose Effects in the Lens Jointly funded by NASA and DOE Principal Investigator: Lee Goldstein, M.D., Ph.D., Associate Professor in Psychiatry, Neurology, Ophthalmology, Pathology and Laboratory Medicine, & Biomedical Engineering, Boston University’s School Medicine, College of Engineering, and Photonics Center. Boston, Ma. The project includes a new DOE FWP (~$400 K over 3 years) to Lawrence Berkeley National Laboratory with Eleanor Blakely as Project Leader. The work includes a subcontract to support the collaboration of Polly Chang of SRI, International, Menlo Park, CA. and is scheduled to begin as early as August 2009. This proposal was submitted in response to the joint DOE/NASA

156

NREL: Education Programs - Wind for Schools Project Enters 2013...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind for Schools Project Enters 2013 with 124 Turbine Installations March 29, 2013 This past winter, NREL hosted the Sixth Annual Wind for Schools Summit. Forty-six attendees...

157

NREL: Education Programs - KidWind Project and Wind Education...  

NLE Websites -- All DOE Office Websites (Extended Search)

KidWind Project and Wind Education in the Classroom: Wind Powering America Lessons Learned July 1, 2013 Integrating wind energy curricula into the classroom can seem like a...

158

NREL: Department of Defense Energy Programs - Energy Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

the Department of Defense across all military service branches: Air Force Academy Microgrid Project Photo of a cathedral. NREL is helping the U.S. Air Force guide and implement...

159

Hawaii Geothermal Project. Progress report on the drilling program  

DOE Green Energy (OSTI)

Progress is reported on the following: well conditions; perforating and cementing; temperature-depth plot; slotted liner, well head and auxiliary equipment; well testing and analysis program; well monitoring during standby; environmental assessment; time schedule; and budgets. (MHR)

Not Available

1976-05-05T23:59:59.000Z

160

AEP Ohio - Commercial Custom Project Rebate Program (Ohio) |...  

Open Energy Info (EERE)

Energy Category Energy Efficiency Incentive Programs Amount 0.08kWh (for one year energy savings) plus 100kW AEP's demand reduction (at summer peak) Eligible System Size...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Federal assistance program. Geothermal technology transfer. Project status report, May 1986  

DOE Green Energy (OSTI)

Progress for the month of May, 1986, is described. Projects include evaluation of direct heating of greenhouses and other businesses, technology transfer to consultants, developers and users, and program monitor activities. (ACR)

Lienau, P.J.; Culver, G.

1986-05-01T23:59:59.000Z

162

Energy's Technology Research Project (TRP) Program W(C)-93-015  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

made in the course of or under arrangements entered into under the Department of Energy's Technology Research Project (TRP) Program W(C)-93-015 The Department of Energy (DOE) is...

163

Summary results of an assessment of research projects in the National Photovoltaics Program  

DOE Green Energy (OSTI)

The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

NONE

1995-07-01T23:59:59.000Z

164

Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2  

SciTech Connect

This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal projects concentrate on specific classes of materials and nonproprietary components and are done jointly by DOE and the Automotive Composites Consortium of U.S. Council for Automotive Research (USCAR). The third project developed a rapid tooling process that reduces tooling time, originally some 48-52 weeks, to less than 12 weeks by means of rapid generation of die-casting die inserts and development of generic holding blocks, suitable for use with large casting applications. This project was conducted by the United States Automotive Materials Partnership, another USCAR consortium.

Das, S.

2003-01-23T23:59:59.000Z

165

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

, Merced and Randy Gee, MaryJane Hale and Guenter Fischer of Sol Focus. Please site this report acknowledge the guidance and assistance given by Heater Poiry, Steve Horne, Gary Conley, Randy Gee, MaryJane Hale, and Guenter Fischer of Sol Focus Project team members included: Alfonso Tovar, Jesus

166

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

GENERATION USING PARABOLIC TROUGH SOLAR COLLECTION NOVEMBER 2010 CEC5002011040 Prepared for: California Generation Using Parabolic Trough Solar Collection is the final report for the Reduce Natural Gas Use for Industrial Process Heat using High- Temperature Parabolic Trough Solar Collectors project (Contract Number

167

ATTACHMENT O RECENT DEMONSTRATION PROJECTS FUNDED BY THE IAW PROGRAM  

E-Print Network (OSTI)

Generation in Parabolic Trough Solar Collectors This project is to demonstrate on a pilot scale the ability and demonstrate the direct steam generation (DSG) technology in the #12;receiver tube of a line focus parabolic trough collector, first in a single row, and then to simulate operations in multiple rows. From

168

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

1988-10-01T23:59:59.000Z

169

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

None

1988-10-01T23:59:59.000Z

170

The Daily Princetonian -International fusion project will use Princeton physics lab Summer Program  

E-Print Network (OSTI)

to determine the viability of exploiting cold fusion as an energy source around the world. Much of the researchThe Daily Princetonian - International fusion project will use Princeton physics lab Summer Program | Previous | Next | Calendar International fusion project will use Princeton physics lab By ABBY WILLIAMS

171

Inspection of selected intelligence and special access program work-for-others projects  

Science Conference Proceedings (OSTI)

At the request of the former Secretary, an inspection of six classified intelligence and special access program work-for-others projects was conducted. The purpose of this inspection was to evaluate managements, effectiveness regarding these work-for-others projects and included tests for financial integrity and adherence to applicable laws and regulations. Details of the inspection are provided in this report.

Not Available

1993-10-08T23:59:59.000Z

172

Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas  

E-Print Network (OSTI)

support to assess the economic viability of new tough gas plays (tight gas, shale gas, CBM). Project are illustrated using the US shale gas plays as case templates. Discounted cash flow models are applied1 Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas

Santos, Juan

173

Successful knowledge transfer and project deployment in a service learning program  

Science Conference Proceedings (OSTI)

Service learning programs provide a richer, more practical experience for students and can deliver more benefits to the community by undertaking larger projects not limited by the length of a semester. Long-term projects with a larger scope present both ... Keywords: collaborative learning, community outreach, industry-education relationships, knowledge management, knowledge transfer, service learning

Jon Reid; Erick Slazinski

2003-10-01T23:59:59.000Z

174

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

by the conditions of certification of the power plant, including those that apply to the current suspension of power Corporation (BRPC), the owner of the Bottle Rock Geothermal Power Plant, has submitted a petition to extend the current environmental monitoring program for suspended operations of the power plant for 18 months from

175

Low Dose Radiation Research Program: Project Descriptions-Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Descriptions-Archive Project Descriptions-Archive Effects Of Low Doses of Radiation on DNA Repair Eric J Ackerman (former PNNL) (Jointly funded by NASA and DOE) Pacific Northwest National Laboratory Richland, WA Dr. Ackerman will study the effect of low doses of ionizing radiation on the repair of different types of damage to DNA, including damage from ionizing radiation and that produced by the normal internal operation of the cell. Using a very sensitive technique called host cell reactivation assay (HCR), he will quantitatively measure the repair of each type of DNA damage and thereby measure if the cellular repair system itself has been damaged. He will also determine if unique forms of DNA repair system damage are induced by low doses of cosmic radiation exposure present during space

176

Low Dose Radiation Research Program: Current Funded Project Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Funded Project Descriptions Funded Project Descriptions Effects Of Low Doses of Radiation on DNA Repair Jointly funded by NASA and DOE Eric J Ackerman Pacific Northwest National Laboratory Richland, WA 99352 Dr. Ackerman will study the effect of low doses of ionizing radiation on the repair of different types of damage to DNA, including damage from ionizing radiation and that produced by the normal internal operation of the cell. Using a very sensitive technique called host cell reactivation assay (HCR), he will quantitatively measure the repair of each type of DNA damage and thereby measure if the cellular repair system itself has been damaged. He will also determine if unique forms of DNA repair system damage are induced by low doses of cosmic radiation exposure present during space

177

Program on Technology Innovation: Project Prioritization Optimization Under Budget Uncertainty  

Science Conference Proceedings (OSTI)

It is common for an industrial management team to carry out annual capital-budgeting exercises by rank-ordering projects using net present value (NPV), benefit-to-investment ratio (BIR), or other means. However, obtaining these results can be labor intensive. Additionally, during the course of the year, emerging events can have a significant impact on the plant budget, resulting in significant revision to the ranked list and requiring the expenditure of considerable resources. To address this issue, it w...

2007-11-01T23:59:59.000Z

178

Exxon Catalytic Coal Gasification Process Predevelopment Program. Final project report  

SciTech Connect

This report summarizes the results of work conducted on Predevelopment Research for the Exxon Catalytic Coal Gasification Process. The eighteen-month effort (July 1976-December 1977) was a coordinated program which included operation of a continuous fluidized-bed gasifier, parallel bench-scale research, and engineering studies leading to the preparation of a commercial-scale plant study design and economics for producing SNG from Illinois coal.

Kalina, T.; Nahas, N.C.

1978-12-01T23:59:59.000Z

179

Business Manangement System(BMS), RL-2008/Project Hanford Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

180

UMTRA Project Administrative Files Collection Records Management Program  

SciTech Connect

The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Geothermal Chemical Modeling Project DOE Advanced Brine Chemistry Program  

DOE Green Energy (OSTI)

The brine-calcite-anhydrite-silica scale model program is ready to be used by the industry at a research level. Versions are already in use in studies of scaling in geothermal and oil production systems. A set of short course notes has been prepared to help perspective users. IBM and Macintosh versions of the model are available. The gas phase models have been incorporated in the general package for distribution. Both mainframe (SUN) and PC versions (MacIntosh and IBM) of the code have been distributed.

Moeller, N.; Weare, J.H.

1993-04-01T23:59:59.000Z

182

Popularity, Interoperability, and Impact of Programming Languages in 100,000 Open Source Projects  

E-Print Network (OSTI)

Abstract—Programming languages have been proposed even before the era of the modern computer. As years have gone, computer resources have increased and application domains have expanded, leading to the proliferation of hundreds of programming languages, each attempting to improve over others or to address new programming paradigms. These languages range from procedural languages like C, objectoriented languages like Java, and functional languages such as ML and Haskell. Unfortunately, there is a lack of large scale and comprehensive studies that examine the “popularity”, “interoperability”, and “impact ” of various programming languages. To fill this gap, this study investigates a hundred thousands of open source software projects from GitHub to answer various research questions on the “popularity”, “interoperability ” and “impact ” of various languages measured in different ways (e.g., in terms of lines of code, development teams, issues, etc.). Keywords-Programming languages; Popularity; Interoperability; Open source; Software projects; GitHub

Tegawendé F. Bissy; Ferdian Thung; David Lo; Lingxiao Jiang; Laurent Réveillčre

2013-01-01T23:59:59.000Z

183

Quality Assurance Program Plan (QAPP) Waste Management Project  

Science Conference Proceedings (OSTI)

The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

HORHOTA, M.J.

2000-12-21T23:59:59.000Z

184

Project Hanford management contract quality assurance program implementation plan for nuclear facilities  

SciTech Connect

During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

Bibb, E.K.

1997-10-15T23:59:59.000Z

185

Nuclear criticality safety program for environmental restoration projects  

SciTech Connect

The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site`s mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed.

Marble, R.C.; Brown, T.D.

1994-05-01T23:59:59.000Z

186

Energy's Technology Research Project (TRP) Program W(C)-93-015  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. and Foreign U.S. and Foreign Patent Rights in Inventions made in the course of or under arrangements entered into under the Department of Energy's Technology Research Project (TRP) Program W(C)-93-015 The Department of Energy (DOE) is one of a number of Federal agencies collaborating with the Advanced Research Projects Agency (ARPA) in the Technology Reinvestment Project (TRP). The TRP is a federal effort to develop "dual-use" technologies with both military and commercial applications, and to help small defense firms make the transition to commercial markets. It is anticipated to be a multi-year funding program and has been funded at approximately $472M in FY'93. The TRP is a key part of the President's Defense Reinvestment and Conversion Initiative. The TRP consists of eight statutory programs established under

187

Comparison of Projections to Actual Performance in the DOE-EPRI Wind Turbine Verification Program  

DOE Green Energy (OSTI)

As part of the US Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program (TVP), Global Energy Concepts (GEC) worked with participating utilities to develop a set of performance projections for their projects based on historical site atmospheric conditions, turbine performance data, operation and maintenance (O and M) strategies, and assumptions about various energy losses. After a preliminary operation period at each project, GEC compared the actual performance to projections and evaluated the accuracy of the data and assumptions that formed the performance projections. This paper presents a comparison of 1999 power output, turbine availability, and other performance characteristics to the projections for TVP projects in Texas, Vermont, Iowa, Nebraska, Wisconsin, and Alaska. Factors that were overestimated or underestimated are quantified. Actual wind speeds are compared to projections based on long-term historical measurements. Turbine power curve measurements are compared with data provided by the manufacturers, and loss assumptions are evaluated for accuracy. Overall, the projects performed well, particularly new commercial turbines in the first few years of operation. However, some sites experienced below average wind resources and greater than expected losses. The TVP project owners successfully developed and constructed wind power plants that are now in full commercial operation, serving a total of approximately 12,000 households.

Rhoads, H.; VandenBosche, J.; McCoy, T.; Compton, A. (Global Energy Concepts, LLC); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

188

Continuous Fiber Ceramic Composite (CFCC) Program. Inventory of federally funded CFCC R&D projects  

SciTech Connect

Continuous Fiber Ceramic Composites (CFCC) are a new class of materials that are lighter, stronger, more corrosion resistant, and capable of performing at elevated temperatures. This new type of material offers the potential to meet the demands of a variety of industrial, military, and aerospace applications. The Department of Energy Office of Industrial Technologies (OIT) has a new program on CFCCs for industrial applications and this program has requested an inventory of all federal projects on CFCCs that relate to their new program. The purpose of this project is to identify all other ongoing CFCC research to avoid redundancy in the OIT Program. The inventory will be used as a basis for coordinating with the other ongoing ceramic composite projects. The inventory is divided into two main parts. The first part is concerned with CFCC supporting technologies projects and is organized by the categories listed below. (1) Composite Design; (2) Materials Characterization; (3) Test Methods; (4) Non-Destructive Evaluation; (5) Environmental Effects; (6) Mechanical Properties; (7) Database Life Prediction; (8) Fracture/Damage; and (9) Joining. The second part has information on component development, fabrication, and fiber-related projects.

Richlen, S. [USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States). Office of Industrial Technologies; Caton, G.M.; Karnitz, M.A.; Cox, T.D. [Oak Ridge National Lab., TN (United States); Hong, W. [Institute for Defense Analyses, Alexandria, VA (United States)

1993-05-01T23:59:59.000Z

189

Hawaii energy strategy project 3: Renewable energy resource assessment and development program  

DOE Green Energy (OSTI)

RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

NONE

1995-11-01T23:59:59.000Z

190

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network (OSTI)

Trends in Tax Equity for Renewable Energy. ” Project Financefirms/ _________. 2010b. “Renewable Energy Money Still GoingTreasury Grant Program on Renewable Energy Deployment in

Bolinger, Mark

2012-01-01T23:59:59.000Z

191

Colorado State University Program for developing, testing, evaluating and optimizing solar heating systems. Project status report, April--May 1995  

DOE Green Energy (OSTI)

A project status report for April and May 1995 is given on the Colorado State University program on development of solar heating systems.

NONE

1995-06-01T23:59:59.000Z

192

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan, Rev. 1  

Science Conference Proceedings (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report.

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-12-10T23:59:59.000Z

193

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan  

Science Conference Proceedings (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-10-31T23:59:59.000Z

194

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work...

195

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nt of n y nt of n y Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1508) NAVITASMAX - Novel Tuning of Critical Fluctuations for Advanced Thermal Energy Storage Location: *- Multiple States - Arizona, Massachusetts, New York, Colorado Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support a proof-of-concept project that evaluates and optimizes simple and complex supercritical fluids for use as novel heat storage, transfer, and working fluids in solar and nuclear applications. Proposed work consists of indoor laboratory-based research and development (R&D), modeling, and analysis, including (1) developing theoretical models to explore inhomogeneities and heat capacity anomalies in supercritical fluids, and prove potential to increase heat capacity over ranges of

196

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0207-1609) Planar Energy - Solid-State All Inorganic Rechargeable Lithium Batteries Location: Florida Proposed Action or Project Description: American Recover), and Reinvestment Act: ~ Funding will support laboratory, bench scale, and pilot scale research and development on lithium battery manufacturing processes for use in electrical energy storage for transportation. Categorical Exclusion(s) Applied: x ~ 83.6 Sitinglconstruct1onJoperationldecommlssloning of facilities for bench-scale research, conventional laboratory operations, smalJ..scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 ÂŁ::lli:klkrc

197

Power Quality of Distributed Wind Projects in the Turbine Verification Program  

DOE Green Energy (OSTI)

The Electric Power Research Institute/U.S. Department of Energy (EPRI/DOE) Turbine Verification Program (TVP) includes four distributed wind generation projects connected to utility distribution feeders located in Algona, Iowa; Springview, Nebraska; Glenmore, Wisconsin; and Kotzebue, Alaska. The TVP has undertaken power quality measurements at each project to assess the impact that power quality has on the local utility grids. The measurements and analysis were guided by the draft IEC 61400-21 standard for power quality testing of wind turbines. The power quality characteristics measured include maximum power, distribution feeder voltage regulation, reactive power, and harmonics. This paper describes the approach to the measurements, the unique electrical system features of the four projects, and an assessment of measured power quality relative to limits prescribed by standards. It also gives anecdotal stories from each project regarding the impact of power quality on the respective distribution feeders.

Green, J; VandenBosche, J.; Lettenmaier, T.; Randall, G; Wind, T

2001-09-13T23:59:59.000Z

198

Projects from Federal Region IX: Department of Energy Appropriate Energy Technology Program. Part II  

DOE Green Energy (OSTI)

Details and progress of appropriate energy technology programs in Region IX are presented. In Arizona, the projects are Solar Hot Water for the Prescott Adult Center and Solar Prototype House for a Residential Community. In California, the projects are Solar AquaDome Demonstration Project; Solar Powered Liquid Circulating Pump; Appropriate Energy Technology Resource Center; Digester for Wastewater Grown Aquatic Plants; Performance Characteristics of an Anaerobic Wastewater Lagoon Primary Treatment System; Appropriate Energy/Energy Conservation Demonstration Project; Solar Energy for Composting Toilets; Dry Creek Rancheria Solar Demonstration Projects; Demonstration for Energy Retrofit Analysis and Implementation; and Active Solar Space Heating System for the Integral Urban House. In Hawaii, the projects are: Java Plum Electric; Low-Cost Pond Digesters for Hawaiian Pig Farm Energy Needs; Solar Beeswax Melter; Methane Gas Plant for Operating Boilers and Generating Steam; and Solar Water Heating in Sugarcane Seed-Treatment Plants. A Wind-Powered Lighted Navigation Buoys Project for Guam is also described. A revised description of the Biogas Energy for Hawaiian Small Farms and Homesteads is given in an appendix.

Case, C.W.; Clark, H.R.; Kay, J.; Lucarelli, F.B.; Rizer, S.

1980-01-01T23:59:59.000Z

199

NETL: News Release - SECA Fuel Cell Program Moves Two Key Projects Into  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2009 5, 2009 SECA Fuel Cell Program Moves Two Key Projects Into Next Phase Projects Continue Push for Low-Cost, Environmentally Friendly Coal Power Washington, DC-The U.S. Department of Energy (DOE) has selected two projects for continuation within the Department's Solid State Energy Conversion Alliance (SECA) Program research portfolio. The projects-led by FuelCell Energy, in partnership with VersaPower Systems, and Siemens Energy-have successfully demonstrated solid oxide fuel cells (SOFCs) designed for aggregation and use in coal-fueled central power generation. Further development of these low-cost, near-zero emission fuel cell systems will substantially contribute to solving the Nation's energy security, climate, and water challenges. The selections were based upon an assessment of demonstrated progress in developing high-performance, low-cost SOFC technology. FuelCell Energy is testing two ~10kilowatt SOFC stacks incorporating planar cells; each has surpassed 4,700 hours of operation to date. Similarly, Siemens is testing a ~10kilowatt SOFC stack incorporating its new higher power Delta cells, with 2,500 hours of operation to date. With the continuation, these projects will pursue cell materials and design development to further improve performance, reduce cost, and integrate the cells into larger stacks for evaluation and incorporation into larger demonstrations beginning in 2012.

200

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report  

SciTech Connect

This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project`s quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal.

Bolivar, S.L.; Burningham, A.; Chavez, P. [and others

1994-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update  

SciTech Connect

This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed by Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).

Grant, C W; Lenderman, J S; Gansemer, J D

2011-02-24T23:59:59.000Z

202

The Accelerated Site Technology Deployment Program/Segmented Gate System Project  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is working to accelerate the acceptance and application of innovative technologies that improve the way the nation manages its environmental remediation problems. The DOE Office of Science and Technology established the Accelerated Site Technology Deployment Program (ASTD) to help accelerate the acceptance and implementation of new and innovative soil and ground water remediation technologies. Coordinated by the Department of Energy's Idaho Office, the ASTD Program reduces many of the classic barriers to the deployment of new technologies by involving government, industry, and regulatory agencies in the assessment, implementation, and validation of innovative technologies. Funding is provided through the ASTD Program to assist participating site managers in implementing innovative technologies. The program provides technical assistance to the participating DOE sites by coordinating DOE, industry, and regulatory participation in each project; providing finds for optimizing full-scale operating parameters; coordinating technology performance monitoring; and by developing cost and performance reports on the technology applications.

PATTESON,RAYMOND

2000-09-18T23:59:59.000Z

203

BWRVIP-86, Revision 1-A: BWR Vessel and Internals Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan  

Science Conference Proceedings (OSTI)

This report describes the boiling water reactor (BWR) Integrated Surveillance Program (ISP). Based on recommendations from BWR Vessel and Internals Project (BWRVIP) utilities, it was concluded that combining all separate BWR surveillance programs into a single integrated program would be beneficial. In the integrated program, representative materials chosen for a specific reactor pressure vessel (RPV) can be materials from another plant surveillance program or other source that better represents the ...

2012-10-01T23:59:59.000Z

204

Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.  

SciTech Connect

The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

United States. Bonneville Power Administration.

1995-09-01T23:59:59.000Z

205

Small Business Innovation Research (SBIR) Hydrogen Program New Projects Awarded in FY 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2011 Annual Progress Report DOE Hydrogen and Fuel Cells Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve research and development (R&D) objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit

206

U.S. DEPARTMENT OF ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO  

NLE Websites -- All DOE Office Websites (Extended Search)

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO 2 THIS PAGE INTENTIONALLY LEFT BLANK OFFICE OF FOSSIL ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO 3 Disclaimer DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not neces-

207

Supply curve impacts of Quick Start projects in Phase 1 of the Resource Supply Expansion Program  

DOE Green Energy (OSTI)

The Pacific Northwest Laboratory (PNL) prepared this report under contract to the Bonneville Power Administration (Bonneville), as part of the Resource Supply Expansion Project (RSEP). RSEP is a regional program instituted by Bonneville to expand conservation and renewable generation options available to resource planners and utilities. Resource alternatives are increased by RSEP through demonstration projects designed in a collaborative process that targets specific barriers to resource development including institutional, market, and reliability barriers. RSEP was launched with several projects that were designed and implemented quickly in 1992 to lay a foundation for future collaboration. The purpose of this report is to introduce the goal and structure of RSEP and to describe the so-called ``Quick Start`` RSEP projects in Phase One of RSEP. This description includes a preliminary estimate of the energy savings and/or other expected impacts of RSEP projects funded in FY 1992 and 1993. Similar estimates are also included for Bonneville projects to confirm wind and geothermal generation potential. Bonneville`s Geothermal Confirmation Agenda preceded implementation of RSEP, although it has a similar objective and collaborative approach.

Wright, G.A.; Warwick, W.M.; Durfee, D.L.

1993-12-01T23:59:59.000Z

208

Paying Upfront: A Review of Salt River Project's M-Power Prepaid Program  

Science Conference Proceedings (OSTI)

Arizonas Salt River Project (SRP) has operated M-Power, the largest electricity prepayment program in the United States, since 1993. The customer population has grown to about 100,000 (approximately 12% of all residences served by SRP), and it has expanded from the initial target populationconsumers with arrears facing service terminations and low-income customersto include consumers with different expectations from M-Power service. The in-home portion of the SRP prepay configuration consists of a user d...

2010-10-12T23:59:59.000Z

209

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1544) Sheetak Inc. - Thermoelectric Reactors for Efficient Automotive Thermal Storage Location: *- Multiple States - New York, Pennsylvania, Texas Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support development of a novel system of thermoelectric reactors for efficient automotive thermal energy storage (TREATS) in electric vehicle and plug-in hybrid electric vehicle Heating, Ventilation, and Cooling (HVAC) systems. Proposed work consists of indoor laboratory-based research and development, including (1) experimentation and analysis to assess the mechanics and dynamics of thermoelectric reactors, (2) design, fabrication, testing, and analysis of hot and cold reactors, (3) design, fabrication, testing, and

210

Letter of Intent for RPP Characterization Program Process Engineering and Hanford Analytical Services and Characterization Project  

Science Conference Proceedings (OSTI)

The Characterization Project level of success achieved by the River Protection Project (RPP) is determined by the effectiveness of several organizations across RPP working together. The requirements, expectations, interrelationships, and performance criteria for each of these organizations were examined in order to understand the performances necessary to achieve characterization objectives. This Letter of Intent documents the results of the above examination. It formalizes the details of interfaces, working agreements, and requirements for obtaining and transferring tank waste samples from the Tank Farm System (RPP Process Engineering, Characterization Project Operations, and RPP Quality Assurance) to the characterization laboratory complex (222-S Laboratory, Waste Sampling and Characterization Facility, and the Hanford Analytical Service Program) and for the laboratory complex analysis and reporting of analytical results.

ADAMS, M.R.

2000-02-25T23:59:59.000Z

211

Hydrologic Resources Management Program and Underground Test Area Project FY 2000 Progress Report  

SciTech Connect

This report highlights the results of FY 2000 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) Project. This is the latest in a series of annual reports published by LLNL-ANCD to document recent investigations of radionuclide migration and transport processes at the Nevada Test Site (NTS). The HRMP is sponsored by Defense Programs (DP) at the U.S. Department of Energy, Nevada Operations Office (DOENV), and supports DP operations at the NTS through studies of radiochemical and hydrologic processes that are relevant to the DP mission. Other organizations that support the HRMP include Los Alamos National Laboratory (LANL), the U.S. Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the U.S. Environmental Protection Agency (EPS), and Bechtel Nevada (BN). The UGTA Project is sponsored by the Environmental Management (EM) program at DOENV; its goal is to determine the extent of radionuclide contamination in groundwater resulting from underground nuclear testing at the NTS. The project strategy follows guidelines set forth in a Federal Facilities Agreement and Consent Order between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Participating contractors include LLNL (both ANCD and the Energy and Environmental Sciences Directorate), LANL, USGS, DRI, BN, and IT Corporation (with subcontract support from Geotrans Inc.).

Davisson, M L; Eaton, G F; Hakemi, N L; Hudson, G B; Hutcheon, I D; Lau, C A; Kersting, A B; Kenneally, J M; Moran, J E; Phinney, D L; Rose, T P; Smith, D K; Sylwester, E R; Wang, L; Williams, R; Zavarin, M

2001-07-01T23:59:59.000Z

212

Combustion Engineering Integrated Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program  

SciTech Connect

On February 22, 1988, DOE issued Program Opportunity Notice (PON) Number-DE-PS01-88FE61530 for Round II of the CCT Program. The purpose of the PON was to solicit proposals to conduct cost-shared ICCT projects to demonstrate technologies that are capable of being commercialized in the 1990s, that are more cost-effective than current technologies, and that are capable of achieving significant reduction of SO[sub 2] and/or NO[sub x] emissions from existing coal burning facilities, particularly those that contribute to transboundary and interstate pollution. The Combustion Engineering (C-E) Integrated Coal Gasification Combined Cycle (IGCC) Repowering Project was one of 16 proposals selected by DOE for negotiation of cost-shared federal funding support from among the 55 proposals that were received in response to the PON. The ICCT Program has developed a three-level strategy for complying with the National Environmental Policy Act (NEPA) that is consistent with the President's Council on Environmental Quality regulations implementing NEPA (40 CFR 1500-1508) and the DOE guidelines for compliance with NEPA (10 CFR 1021). The strategy includes the consideration of programmatic and project-specific environmental impacts during and subsequent to the reject selection process.

1992-03-01T23:59:59.000Z

213

Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects  

Science Conference Proceedings (OSTI)

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at concentrations typically < E4 pCi/ gram total activity. 3. Although external exposure rates are generally low resulting in few exposures above background, occasional 'hot spots' are observed in the 1- 10 mR / hr range or higher. However personnel and general area external exposure monitoring programs consistently demonstrate very low potential for external exposure at theses sites. 4. Potential for airborne exposure is controlled by wetting and misting techniques during excavation and movement of materials. Air sampling and bioassay programs confirm low potential for airborne exposure of workers at these sites. 5. Radiation protection and health physics monitoring programs as implemented at these sites ensure that exposures to personal are maintained ALARA. (authors)

Brown, S.H. [CHP, SHB INC., Centennial, Colorado (United States)

2008-07-01T23:59:59.000Z

214

Advanced Industrial Materials (AIM) Program: Compilation of project summaries and significant accomplishments, FY 1995  

Science Conference Proceedings (OSTI)

In many ways, the Advanced Industrial Materials (AIM) Program underwent a major transformation in Fiscal Year 1995 and these changes have continued to the present. When the Program was established in 1990 as the Advanced Industrial Concepts (AIC) Materials Program, the mission was to conduct applied research and development to bring materials and processing technologies from the knowledge derived from basic research to the maturity required for the end use sectors for commercialization. In 1995, the Office of Industrial Technologies (OIT) made radical changes in structure and procedures. All technology development was directed toward the seven ``Vision Industries`` that use about 80% of industrial energy and generated about 90% of industrial wastes. The mission of AIM has, therefore, changed to ``Support development and commercialization of new or improved materials to improve productivity, product quality, and energy efficiency in the major process industries.`` Though AIM remains essentially a National Laboratory Program, it is essential that each project have industrial partners, including suppliers to, and customers of, the seven industries. Now, well into FY 1996, the transition is nearly complete and the AIM Program remains reasonably healthy and productive, thanks to the superb investigators and Laboratory Program Managers. This report contains the technical details of some very remarkable work by the best materials scientists and engineers in the world. Subject areas covered are: advanced metals and composites; advanced ceramics and composites; polymers and biobased materials; and new materials and processes.

NONE

1996-04-01T23:59:59.000Z

215

Wind for Schools Project Curriculum Brief (Fact Sheet), Wind And Water Power Program (WWPP)  

Wind Powering America (EERE)

Introduction Introduction The U.S. Department of Energy's (DOE's) 20% Wind Energy by 2030 report recommends expanding educa- tion to ensure a trained workforce to meet the projected growth of the wind industry and deployment. Although a few U.S. higher education institu- tions offer wind technology education programs, most are found in community and technical colleges, resulting in a shortage of programs preparing highly skilled graduates for wind industry careers. Further, the United States lags behind Europe (which has more gradu- ate programs in wind technology design and manufacturing) and is in danger of relinquishing the economic benefits of domestic production of wind turbines and related components and services to European countries. DOE's Wind Powering America initia-

216

Advanced Industrial Materials (AIM) program. Compilation of project summaries and significant accomplishments FY 1996  

Science Conference Proceedings (OSTI)

In many ways, the Advanced Industrial Materials (AIM) Program underwent a major transformation in Fiscal Year 1995 and these changes have continued to the present. When the Program was established in 1990 as the Advanced Industrial Concepts (AIC) Materials Program, the mission was to conduct applied research and development to bring materials and processing technologies from the knowledge derived from basic research to the maturity required for the end use sectors for commercialization. In 1995, the Office of Industrial Technologies (OIT) made radical changes in structure and procedures. All technology development was directed toward the seven {open_quotes}Vision Industries{close_quotes} that use about 80% of industrial energy and generated about 90% of industrial wastes. These are: (1) Aluminum; (2) Chemical; (3) Forest Products; (4) Glass; (5) Metal Casting; (6) Refineries; and (7) Steel. This report is a compilation of project summaries and significant accomplishments on materials.

NONE

1997-04-01T23:59:59.000Z

217

Solar-MEC development program. Project 9103 quarterly progress report, September 1--November 30, 1977  

DOE Green Energy (OSTI)

Arrangements for desiccant wheel performance tests, initial work on the computer model of dynamic behavior of the desiccant wheel, and the laboratory program are discussed. Formal arrangements are underway for a subcontract to Cargocaire Engineering Corp. to measure the drying performance of the Solar-MEC molecular sieve desiccant wheel. After negotiations for more detailed testing, it was decided that tests of the type originally proposed to the Solar Heating and Cooling Research Branch of DOE would be most suitable. Evaluation of an earlier computer model of the desiccant wheel, developed by AB Carl Munters, Sweden, indicated that it will be most effective to modify that program for use in this project, rather than use one that had been developed earlier at IGT. Both programs are based on essentially the same physical model of the drying and regeneration processes. The equipment needed for characterizing air-leak rates and identifying leakage paths has been designed and assembled. Tests will start soon.

Staats, W.R.; Wurm, J.

1977-12-01T23:59:59.000Z

218

Home energy saver's program: a report on a demonstration project undertaken in Utah  

SciTech Connect

A demonstration project undertaken in Utah designed to test a Home Energy Saver Program (funded by the Federal Energy Administration) is described. The basic purposes of the program were: (1) to encourage and bring about a significant reduction in home energy use, and (2) to test the impact of various energy conservation research elements on homeowners' participation. The principal research elements tested were: direct mailing of HESP workbooks to single family homeowners; use of a telephone hotline; use of workshops; use of a coordinated media program; and use of church and community support. In addition, the impact of a contest drawing, designed to motivate homeowners to compute their potential annual energy savings, was tested. (MCW)

Jensen, G.F.

1977-06-01T23:59:59.000Z

219

Home Energy Savers' Program. A report on a demonstration project undertaken in Utah  

SciTech Connect

The Utah Home Energy Savers Program (HESP) is described and results are summarized. The project basically tested the impact of several research elements on homeowners participation through the use of: a direct mailing of 276,000 HESP workbooks to single-family homeowners; a telephone hotline to respond to incoming calls and to conduct an energy conservation survey; workshops to acquaint the citizenry with the facts of the national and statewide energy situation and the contents of the HESP workbook; a professional, commercial promotional firm to undertake a coordinated media program in support of the mailing of the HESP workbook; church and community sponshorship of the program; and selected methods of reaching sparsely populated areas.

Jensen, G.F.

1977-01-01T23:59:59.000Z

220

Elements of a Federal Privacy Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management MOX Services Unclassified...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ORAU Science Education Program (SEP) Global Change Education...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management MOX Services Unclassified...

222

HSS Visiting Speaker Program - October 28, 2009 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Legacy Management iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management MOX Services Unclassified...

223

Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report  

SciTech Connect

The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

Lund, John W.

2002-03-22T23:59:59.000Z

224

Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000  

SciTech Connect

The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical--can continue in its role as a key component in the U.S. and world energy markets. The CCT Program also has global importance in providing clean, efficient coal-based technology to a burgeoning energy market in developing countries largely dependent on coal. Based on 1997 data, world energy consumption is expected to increase 60 percent by 2020, with almost half of the energy increment occurring in developing Asia (including China and India). By 2020, energy consumption in developing Asia is projected to surpass consumption in North America. The energy form contributing most to the growth is electricity, as developing Asia establishes its energy infrastructure. Coal, the predominant indigenous fuel, in that region will be the fuel of choice in electricity production. The CCTs offer a means to mitigate potential environmental problems associated with unprecedented energy growth, and to enhance the U.S. economy through foreign equipment sales and engineering services.

NONE

2000-09-01T23:59:59.000Z

225

BWRVIP-239: BWR Vessel and Internals Project, Updated Evaluation of the Integrated Surveillance Program (ISP) Capsule Withdrawal Sch edule  

Science Conference Proceedings (OSTI)

This report evaluates updated reactor pressure vessel and surveillance capsule fluence data for potential impacts on the Boiling Water Reactor Vessel and Internals Project Integrated Surveillance Program (BWRVIP ISP) capsule withdrawal schedule.

2010-07-16T23:59:59.000Z

226

An effective approach to choosing project, program and portfolio management software at a large and geographically diverse company  

E-Print Network (OSTI)

Selecting and deploying an IT tool can be very complicated and expensive. This paper studies a particular approach to choosing project, program and portfolio management software at one large and geographically diverse ...

Brost, Missy M. (Missy Marie)

2009-01-01T23:59:59.000Z

227

Combustion Engineering Integrated Coal Gasification Combined Cycle Repowering Project, Clean Coal Technology Program  

Science Conference Proceedings (OSTI)

The DOE entered into a cooperative agreement with Combustion Engineering, Inc. (C-E) under which DOE proposes to provide cost-shared funding to design, construct, and operate an Integrated Coal Gasification Combined Cycle (IGCC) project to repower an existing steam turbine generator set at the Springfield (Illinois) City Water, Light and Power (CWL P) Lakeside Generating Station, while capturing 90% of the coal's sulfur and producing elemental sulfur as a salable by-product. The proposed demonstration would help determine the technical and economic feasibility of the proposed IGCC technology on a scale that would allow the utility industry to assess its applicability for repowering other coal-burning power plants. This Environmental Assessment (EA) has been prepared by DOE in compliance with the requirements of National Environmental Policy Act (NEPA). The sources of information for this EA include the following: C-E's technical proposal for the project submitted to DOE in response to the Innovative Clean Coal Technology (ICCT) Program Opportunity Notice (PON); discussions with C-E and CWL P staff; the volume of environmental information for the project and its supplements provided by C-E; and a site visit to the proposed project site.

Not Available

1992-03-01T23:59:59.000Z

228

Combustion Engineering Integrated Coal Gasification Combined Cycle Repowering Project, Clean Coal Technology Program. Environmental Assessment  

Science Conference Proceedings (OSTI)

The DOE entered into a cooperative agreement with Combustion Engineering, Inc. (C-E) under which DOE proposes to provide cost-shared funding to design, construct, and operate an Integrated Coal Gasification Combined Cycle (IGCC) project to repower an existing steam turbine generator set at the Springfield (Illinois) City Water, Light and Power (CWL&P) Lakeside Generating Station, while capturing 90% of the coal`s sulfur and producing elemental sulfur as a salable by-product. The proposed demonstration would help determine the technical and economic feasibility of the proposed IGCC technology on a scale that would allow the utility industry to assess its applicability for repowering other coal-burning power plants. This Environmental Assessment (EA) has been prepared by DOE in compliance with the requirements of National Environmental Policy Act (NEPA). The sources of information for this EA include the following: C-E`s technical proposal for the project submitted to DOE in response to the Innovative Clean Coal Technology (ICCT) Program Opportunity Notice (PON); discussions with C-E and CWL&P staff; the volume of environmental information for the project and its supplements provided by C-E; and a site visit to the proposed project site.

Not Available

1992-03-01T23:59:59.000Z

229

Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL  

SciTech Connect

The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project.

NONE

1994-10-01T23:59:59.000Z

230

California Hydrogen Infrastructure Project - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Edward C. Heydorn Air Products and Chemicals, Inc. 7201 Hamilton Boulevard Allentown, PA 18195 Phone: (610) 481-7099 Email: heydorec@airproducts.com DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Jim Alkire Phone: (720) 356-1426 Email: James.Alkire@go.doe.gov Contract Number: DE-FC36-05GO85026 Working Partners/Subcontractors: * University of California Irvine (UCI), Irvine, CA * National Fuel Cell Research Center (NFCRC), Irvine, CA Project Start Date: August 1, 2005 Project End Date: December 31, 2011 Fiscal Year (FY) 2012 Objectives Demonstrate a cost-effective infrastructure model in

231

Project Listings by Organization, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

25 25 FY 2007 Annual Progress Report DOE Hydrogen Program XVI. Project Listings by Organization 3M V.E.1 Novel Approach to Non-Precious Metal Catalysts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .820 V.E.4 Advanced Cathode Catalysts and Supports for PEM Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .833 V.L.2 Adaptive Stack With Subdivided Cells for Improved Stability, Reliability, and Durability Under Automotive Load Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .874 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.M.3 New Polyelectrolyte Materials for High Temperature Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

232

Projects Listings by State, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program XV. Project Listings by State Alabama II.I.7 Production and Storage of Hydrogen from Coal Using C1 Chemistry . . . . . . . . . . . . . . . . . . . . . . . . .207 IV.B.5k Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . 514 V.D.21 Nanostructured Catalysts for Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .803 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.R.2 Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1042

233

MHK Projects/NJBPU 1 5 MW Demonstration Program | Open Energy Information  

Open Energy Info (EERE)

NJBPU 1 5 MW Demonstration Program NJBPU 1 5 MW Demonstration Program < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.6032,"lon":-74.3401,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

234

CMAS 3D, a new program to visualize and project major elements compositions in the CMAS system  

Science Conference Proceedings (OSTI)

CMAS 3D, developed in MATLAB^(R), is a program to support visualization of major element chemical data in three dimensions. Such projections are used to discuss correlations, metamorphic reactions and the chemical evolution of rocks, melts or minerals. ... Keywords: 3D, CMAS system, Projection

L. France; N. Ouillon; G. Chazot; J. Kornprobst; P. Boivin

2009-06-01T23:59:59.000Z

235

Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S&M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project.

NONE

1995-04-01T23:59:59.000Z

236

RETROFIT RAMP-UP SELECTED PROJECTS* Austin, Texas ($10 Million): The Austin Climate Protection Retrofit Program will accelerate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RETROFIT RAMP-UP SELECTED PROJECTS* RETROFIT RAMP-UP SELECTED PROJECTS* Austin, Texas ($10 Million): The Austin Climate Protection Retrofit Program will accelerate energy and water efficiency and integrated renewable energy improvements in private and commercial properties in the City of Austin and Austin Energy's service territory. The project will focus on alternative financing options for property owners, including new financing mechanisms, interest rate buy downs, and on-bill repayment. Boulder County, Colorado ($25 Million): Boulder County is partnering with the city of Denver, Garfield County, the Governor's Energy Office, Xcel Energy and others to launch the Colorado Retrofit Ramp-Up Program that will stimulate economic growth and investment in

237

Hydrogen-engine performance-analysis project. Second quarterly report first year of program  

DOE Green Energy (OSTI)

The objective of this research effort is to obtain the design data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. To this end hydrogen-fueled internal combustion engines were divided into fourteen subgroups. An engine representative of each subgroup will be tested during the course of the three year program. The Project Program Plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two years. Work accomplished during the second three months of the project is reported. Activities during the second quarter concentrated on: final apparatus debugging, engine break-in, preliminary testing to determine qualitative apparatus operating characteristics, rearranging of the proposal test schedule and performing of tests with engine 1 (carbureted, throttled, no H/sub 2/O injection, no EGR and engine 4 (carbureted, unthrottled, no H/sub 2/O injection, no EGR. The details of these activities are described.

Adt, R.R. Jr.; Swain, M.R.; Pappas, J.M.

1977-06-01T23:59:59.000Z

238

Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report  

Science Conference Proceedings (OSTI)

This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).

Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

2007-03-23T23:59:59.000Z

239

DOE project review Massachusetts Photovoltaic Program. Annual report, June 1989--July 1990  

DOE Green Energy (OSTI)

This is the third year of operations for work under the Cooperative Agreement between the Commonwealth of Massachusetts Photovoltaic Center and the U.S. Department of Energy. As a collaborative effort with shared resources, the activity at the Photovoltaic Center and the University of Lowell Photovoltaic Program has continued to advance the utilization and implementation of photovoltaic-powered systems into society. The programs and activities developed over the past three years have supported strategies that cover both international utilization as well as domestic application. Three major areas of activities have centered around the following themes: (1) The identification of market opportunities to enlarge sales potential for the photovoltaic industry. (2) The development of a knowledgeable infrastructure to support PV diffusion in Massachusetts, in the United States, and around the world. (3) The analysis of the physical, economic, and regulatory environment in which PV must compete with mature energy technologies. This past year has been an experience of contrasts for the Photovoltaic Center. Projects and activities have resulted in the successful completion of programs goals.

NONE

1996-06-01T23:59:59.000Z

240

DOE-STD-1149-2002; Safety and Health Program for DOE Construction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

49-2002 49-2002 February 2002 DOE STANDARD SAFETY AND HEALTH PROGRAM FOR DOE CONSTRUCTION PROJECTS U.S. Department of Energy AREA OCSH Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-1149-2002 iii TABLE OF CONTENTS PARAGRAPH PAGE FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . .

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

-237 -237 Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects November 2001 Prepared by Sujit Das Oak Ridge National Laboratory Jean H. Peretz The University of Tennessee Bruce Tonn Oak Ridge National Laboratory DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source: National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-605-6000 (1-800-553-6847) TDD: 703-487-4639 Fax: 703-605-6900 E-mail: info@ntis.fedworld.gov Web site: http://www.ntis.gov/support/ordernowabout.htm

242

MHK Projects/US Navy Wave Energy Technology WET Program at Marine Corps  

Open Energy Info (EERE)

US Navy Wave Energy Technology WET Program at Marine Corps US Navy Wave Energy Technology WET Program at Marine Corps Base Hawaii MCBH < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.4164,"lon":-157.784,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

243

Solar-MEC Development Program. Project 61019 annual report, September 1, 1977-September 30, 1978  

DOE Green Energy (OSTI)

The SOLAR-MEC is the most advanced open-cycle, solid-desiccant heating/cooling system being considered for solar applications. Based on the results of field tests with several residential-size units, begun in early 1975, a 2-year program has been under way. Details of the accomplishments during the first year of the project (FY 1978) are presented which include: (1) development of data necessary to model the dynamic performance of the desiccation process of the SOLAR-MEC system; (2) mathematical description (modeling and computer programs) of the component processes of the system namely, desiccation, heat exchange, and evaporative cooling; (3) development and evaluation of several design improvements to increase seasonal cooling efficiency and capacity (namely, staged regeneration of the desiccant wheel and unbalanced-flow design of the heat exchanger wheel); (4) investigation and redesign of air-seals, wheel support, and drive mechanisms, and of air distribution (including the selection of high efficiency fans) to reduce parasitic power consumption of motor-blower assemblies; (5) investigation of the long-term stability of the rotary heat exchanger wheel performance including the selection of a low-cost alternative matrix; and (6) investigation and liaison activity for the selection of a practical non-asbestos molecular-sieve support matrix for the desiccant. (WHK)

Wurm, J.; Kinast, J.A.; Rush, W.F. Jr., Zawacki, T.S.; Macriss, R.A.

1979-10-01T23:59:59.000Z

244

Concrete concentrator panel development program for SolarOil project, Phase I  

DOE Green Energy (OSTI)

The results of the General Atomic (GA) fixed-mirror solar concentrator (FMSC) concrete panel development program are presented. The FMSC is part of the solar steam supply system proposed by GA for the SolarOil project. The program was conducted to determine the achievable accuracy of precast concrete concentrator panels and to investigate expedient and economical mass production of the panels. One steel form, two concrete forms, and three concrete panels were fabricated and about 1500 slat angle measurements made using a laser inspection fixture developed expressly for this purpose. All panels were 1.83 m (6 ft) long and had a 3.6 m (11 ft 10 in.) aperture and 71 slats. Proper concrete mixes, parting compounds, placement methods, vibrating techniques, and curing procedures were identified, and the hardware and techniques for stripping and turning the panels were tested. Based upon test results and structural calculations it was concluded that reasonably priced 5.5-m (18 ft) long panels can be produced with either steel or fiberglass-coated concrete forms with 95% to 99% of the slat area within +-0.25/sup 0/ of the desired angles. With steam curing, the production rate is one panel every other working day per 5.5 m (18 ft) of form length.

Nicolayeff, V.; Chow, G.S.; Koploy, M.

1980-05-01T23:59:59.000Z

245

Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.  

Science Conference Proceedings (OSTI)

Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and Johnson 1997; Pravecek and Kline 1998; Kline and Heindel 1999; Hebdon et al. 2000; Flagg et al. 2001; Kline and Willard 2001; Frost et al. 2002; Hebdon et al. 2002; Hebdon et al. 2003; Kline et al. 2003a; Kline et al. 2003b; Willard et al. 2003a; Willard et al. 2003b; Baker et al. 2004; Baker et al. 2005; Willard et al. 2005; Baker et al. 2006; Plaster et al. 2006; Baker et al. 2007). The immediate goal of the program is to utilize captive broodstock technology to conserve the population's unique genetics. Long-term goals include increasing the number of individuals in the population to address delisting criteria and to provide sport and treaty harvest opportunity. (1) Develop captive broodstocks from Redfish Lake sockeye salmon, culture broodstocks and produce progeny for reintroduction. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program reintroduction efforts. (4) Utilize genetic analysis to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, provide written activity reports, and participate in essential program management and planning activities. Idaho Department of Fish and Game's participation in the Snake River Sockeye Salmon Captive Broodstock Program includes two areas of effort: (1) sockeye salmon captive broodstock culture, and (2) sockeye salmon research and evaluations. Although objectives and tasks from both components overlap and contribute to achieving the same goals, work directly related to sockeye salmon captive broodstock research and enhancement will appear under a separate cover. Research and enhancement activities associated with Snake River sockeye salmon are permitted under NOAA permit numbers 1120, 1124, and 1481. This report details fish

Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

2008-12-17T23:59:59.000Z

246

Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.  

DOE Green Energy (OSTI)

Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and Johnson 1997; Pravecek and Kline 1998; Kline and Heindel 1999; Hebdon et al. 2000; Flagg et al. 2001; Kline and Willard 2001; Frost et al. 2002; Hebdon et al. 2002; Hebdon et al. 2003; Kline et al. 2003a; Kline et al. 2003b; Willard et al. 2003a; Willard et al. 2003b; Baker et al. 2004; Baker et al. 2005; Willard et al. 2005; Baker et al. 2006; Plaster et al. 2006; Baker et al. 2007). The immediate goal of the program is to utilize captive broodstock technology to conserve the population's unique genetics. Long-term goals include increasing the number of individuals in the population to address delisting criteria and to provide sport and treaty harvest opportunity. (1) Develop captive broodstocks from Redfish Lake sockeye salmon, culture broodstocks and produce progeny for reintroduction. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program reintroduction efforts. (4) Utilize genetic analysis to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, provide written activity reports, and participate in essential program management and planning activities. Idaho Department of Fish and Game's participation in the Snake River Sockeye Salmon Captive Broodstock Program includes two areas of effort: (1) sockeye salmon captive broodstock culture, and (2) sockeye salmon research and evaluations. Although objectives and tasks from both components overlap and contribute to achieving the same goals, work directly related to sockeye salmon captive broodstock research and enhancement will appear under a separate cover. Research and enhancement activities associated with Snake River sockeye salmon are permitted under NOAA permit numbers 1120, 1124, and 1481. This report details fish

Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

2008-12-17T23:59:59.000Z

247

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

248

Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program  

DOE Green Energy (OSTI)

This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

Steinberg, D.; Porro, G.; Goldberg, M.

2012-04-01T23:59:59.000Z

249

Corporate Information Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporate Information Systems Corporate Information Systems Corporate Information Systems The mission of the Office of Corporate Information Systems (CF-40) is to plan and manage the design, development, operation and maintenance of the Department's Integrated Management Navigation (iManage) program and projects; identify and implement business process automation initiatives; provide technical support for legacy systems operations and maintenance; provide technical support for web design, development and maintenance; manage cyber security and enterprise architecture activities; and serve as the liaison to Chief Information Officer for Information Technology services. Functions: Plan and manage the design, integration, and implementation of the Department's corporate business systems through the iManage program,

250

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems Â… Projected Performance and Cost Parameters  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen and Fuel Cells Program Record DOE Hydrogen and Fuel Cells Program Record Record #: 9017 Date: July 02, 2010 Title: On-Board Hydrogen Storage Systems - Projected Performance and Cost Parameters Originators: Robert C. Bowman and Ned Stetson Approved by: Sunita Satyapal Date: August 10, 2010 This record summarizes the current technical assessments of hydrogen (H 2 ) storage system capacities and projected manufacturing costs for the scenario of high-volume production (i.e., 500,000 units/year) for various types of "on-board" vehicular storage systems. These analyses were performed within the Hydrogen Storage sub-program of the DOE Fuel Cell Technologies (FCT) program of the Office of Energy Efficiency and Renewable Energy. Item: It is important to note that all system capacities are "net useable capacities" able to be delivered to the

251

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

SciTech Connect

This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

2010-05-05T23:59:59.000Z

252

Project Integration Office for the electric and hybrid vehicle R and D program. Eighth progress report, March 1982  

DOE Green Energy (OSTI)

The Project Integration Office (PIO) was established to assist the US DOE with the direction and coordination of its multiple electric vehicle and hybrid electric vehicle research programs in order to get the maximum payoff from these research efforts. In addition, the PIO performs objective independent technical and economic studies, analyses and modeling, and maintains a technical information liaison service to facilitate information exchange between the program participants and industry. Progress in each of these activities is reported. (LCL)

Not Available

1982-04-19T23:59:59.000Z

253

Wind Turbine Verification Project Experience: 1999: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

EPRI and the U.S. Department of Energy (DOE) initiated the Turbine Verification Program (TVP) in 1992 to evaluate prototype advanced wind turbines and to provide a bridge from development programs to commercial purchases. This report provides an overview and comparisons of site and operating experiences at the seven TVP projects in Ft. Davis, Texas; Searsburg, Vermont; Kotzebue, Alaska; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; and Big Spring, Texas. The lessons learned throughout the prog...

2000-12-12T23:59:59.000Z

254

Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2  

SciTech Connect

In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

Zanner, F.J.; Moffatt, W.C.

1995-07-01T23:59:59.000Z

255

MHK Projects/US Navy Wave Energy Technology WET Program at Marine...  

Open Energy Info (EERE)

of Devices Deployed 6 Number of Build Out Units Deployed 7 Main Overseeing Organization Ocean Power Technologies Project Technology *MHK TechnologiesPowerBuoy Project Timeline and...

256

Utility residential new construction programs: Going beyond the code. A report from the Database on Energy Efficiency Programs (DEEP) Project  

SciTech Connect

Based on an evaluation of 10 residential new construction programs, primarily sponsored by investor-owned utilities in the United States, we find that many of these programs are in dire straits and are in danger of being discontinued because current inclusion of only direct program effects leads to the conclusion that they are not cost-effective. We believe that the cost-effectiveness of residential new construction programs can be improved by: (1) promoting technologies and advanced building design practices that significantly exceed state and federal standards; (2) reducing program marketing costs and developing more effective marketing strategies; (3) recognizing the role of these programs in increasing compliance with existing state building codes; and (4) allowing utilities to obtain an ``energy-savings credit`` from utility regulators for program spillover (market transformation) impacts. Utilities can also leverage their resources in seizing these opportunities by forming strong and trusting partnerships with the building community and with local and state government.

Vine, E.

1995-08-01T23:59:59.000Z

257

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

258

Analysis of the Costs of a Backlog Project in Response to Recommendation 2 of the 2004 Archives and History Office Program Review Committee Report  

E-Print Network (OSTI)

Analysis of the Costs of a Backlog Project in Response to Recommendation 2 of the 2004 Archives and History Office Program Review Committee Report

O'Hara, Laura

2007-01-01T23:59:59.000Z

259

The cost and performance of utility commercial lighting programs. A report from the Database on Energy Efficiency Programs (DEEP) project  

SciTech Connect

The objective of the Database on Energy Efficiency Programs (DEEP) is to document the measured cost and performance of utility-sponsored, energy-efficiency, demand-side management (DSM) programs. Consistent documentation of DSM programs is a challenging goal because of problems with data consistency, evaluation methodologies, and data reporting formats that continue to limit the usefulness and comparability of individual program results. This first DEEP report investigates the results of 20 recent commercial lighting DSM programs. The report, unlike previous reports of its kind, compares the DSM definitions and methodologies that each utility uses to compute costs and energy savings and then makes adjustments to standardize reported program results. All 20 programs were judged cost-effective when compared to avoided costs in their local areas. At an average cost of 3.9{cents}/kWh, however, utility-sponsored energy efficiency programs are not ``too cheap to meter.`` While it is generally agreed upon that utilities must take active measures to minimize the costs and rate impacts of DSM programs, the authors believe that these activities will be facilitated by industry adoption of standard definitions and reporting formats, so that the best program designs can be readily identified and adopted.

Eto, J.; Vine, E.; Shown, L.; Sonnenblick, R.; Payne, C. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.

1994-05-01T23:59:59.000Z

260

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

LIGHTING RESEARCH PROGRAM Project 5.2 Evaluation of Electronic Ballasts and  

E-Print Network (OSTI)

contribution of ballast for evaluation in this project: Advance Transformer, Aromat, Aurswald, Delta Power

262

Federal loan guaranty programs management report, Task III, Item 005. Tab I. Electric and hybrid vehicle research, development, and demonstration project. Tab II. Geothermal loan guaranty program  

DOE Green Energy (OSTI)

The guaranty program on electric and hybrid vehicle research, development, and demonstration considers two aspects of loan guaranties: (1) how is the loan guaranty, as an incentive device, best integrated into an overall project strategy, and (2) to what extent can cost-effectiveness measurements be introduced to the loan guaranty review and approval process. The report on the geothermal loan guaranty program is an overview of a large number of existing program elements which, in the opinion of the financial community or the historical record of predecessor loan guaranty programs, can be seen to be (or have potential to become) troublesome. Included are relevant administrative, regulatory, and managerial guidelines, commentary, and ideas. (MCW)

Not Available

1977-04-01T23:59:59.000Z

263

Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase  

SciTech Connect

Evaluation of alternative studies determine what decontamination and decommissioning (D&D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams.

Not Available

1993-09-01T23:59:59.000Z

264

PROJECTS FROM FEDERAL REGION IX DEPARTMENT OF ENERGY APPROPRIATE ENERGY TECHNOLOGY PROGRAM PART II  

E-Print Network (OSTI)

Appropriate Energy Technology Resource Center .IX DOE Appropriate Energy Technology Pilot Program - PartOF ENERGY APPROPRIATE ENERGY TECHNOLOGY PROGRAM PART II C.

Case, C.W.

2012-01-01T23:59:59.000Z

265

Occupational Safety and Health Program at the West Valley Demonstration Project  

Science Conference Proceedings (OSTI)

The West Valley Nuclear Services Co. LLC (WVNS) is committed to provide a safe, clean, working environment for employees, and to implement U.S. Department of Energy (DOE) requirements affecting worker safety. The West Valley Demonstration Project (WVDP) Occupational Safety and Health Program is designed to protect the safety, health, and well-being of WVDP employees by identifying, evaluating, and controlling biological, chemical, and physical hazards in the work place. Hazards are controlled within the requirements set forth in the reference section at the end of this report. It is the intent of the WVDP Occupational Safety and Health Program to assure that each employee is provided with a safe and healthy work environment. This report shows the logical path toward ensuring employee safety in planning work at the WVDP. In general, planning work to be performed safely includes: combining requirements from specific programs such as occupational safety, industrial hygiene, radiological control, nuclear safety, fire safety, environmental protection, etc.; including WVDP employees in the safety decision-making processes; pre-planning using safety support re-sources; and integrating the safety processes into the work instructions. Safety management principles help to define the path forward for the WVDP Occupational Safety and Health Program. Roles, responsibilities, and authority of personnel stem from these ideals. WVNS and its subcontractors are guided by the following fundamental safety management principles: ''Protection of the environment, workers, and the public is the highest priority. The safety and well-being of our employees, the public, and the environment must never be compromised in the aggressive pursuit of results and accomplishment of work product. A graded approach to environment, safety, and health in design, construction, operation, maintenance, and deactivation is incorporated to ensure the protection of the workers, the public, and the environment.'' These principles are demonstrated through: Conducting all activities in an atmosphere of trust and confidence based on open, honest, and responsive communication. Using innovative and effective approaches to risk identification and management. Applying a systematic approach to planning and execution of all activities that affect the environment, safety, and health through use of the Integrated Environment, Safety, and Health Management System. Holding line management fully accountable to effectively plan and integrate environment, safety, and health activities into field activities. Providing clear policy and direction on environment, safety, and health issues to guide field work. Encouraging and promoting the sharing of environment, safety, and health information and resources. Empowering employees through training, information, tools, and program involvement to effectively protect themselves and the environment. Ensuring it is every employees' responsibility to identify and report potential safety and health hazards and environmental noncompliance. Together, as a team, we accomplish our mission while protecting the environment and preserving the safety and health of each employee and the public.

L. M. Calderon

1999-04-30T23:59:59.000Z

266

Extending Behavior Protocols With Data and Multisynchronization  

E-Print Network (OSTI)

of a program piece, in particular a component, often depends on data values. Therefore, to model the behaviorCallback.IpAddressInvalidated 2 ) + NULL ) ) } ) 15 #12;) | ?IManagement.UsePermanentIpDatabase^ ); !IManagement; ( ( !IIpMacTransientDb.Remove 2; !IDhcpCallback.IpAddressInvalidated 2 ) + NULL ) ) } ) ) | ?IManagement

267

Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2007, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) Program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit research institution. For more information about

268

X. Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2006, excerpt from DOE Hydrogen Program 2006 Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

61 61 FY 2006 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non- profit research institution.

269

DOE Hydrogen and Fuel Cells Program: Cooperative R&D Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnerships Roadmaps and R&D Status Cooperative R&D Projects U.S. Department of Energy Search help Home > International > Cooperative R&D Projects Printable Version Cooperative...

270

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

271

Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2  

Science Conference Proceedings (OSTI)

The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with boundaries defined by the occupant's activity patterns and the field variation from the sources affecting the area. Such a stratification allows the researcher to determine which microenvironment are of most interest, and to methodically focus the areas, in order to gather the most relevant set of data.

Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

1997-03-11T23:59:59.000Z

272

Impact of the Demand-Side Management (DSM) Program structure on the cost-effectiveness of energy efficiency projects  

SciTech Connect

Pacific Northwest Laboratory (PNL) analyzed the cost-effective energy efficiency potential of Fort Drum, a customer of the Niagara Mohawk Power Corporation (NMPC) in Watertown, New York. Significant cost-effective investments were identified, even without any demand-side management (DSM) incentives from NMPC. Three NMPC DSM programs were then examined to determine the impact of participation on the cost-effective efficiency potential at the Fort. The following three utility programs were analyzed: (1) utility rebates to be paid back through surcharges, (2) a demand reduction program offered in conjunction with an energy services company, and (3) utility financing. Ultimately, utility rebates and financing were found to be the best programs for the Fort. This paper examines the influence that specific characteristics of the DSM programs had on the decision-making process of one customer. Fort Drum represents a significant demand-side resource, whose decisions regarding energy efficiency investments are based on life-cycle cost analysis subject to stringent capital constraints. The structures of the DSM programs offered by NMPC affect the cost-effectiveness of potential efficiency investments and the ability of the Fort to obtain sufficient capital to implement the projects. This paper compares the magnitude of the cost-effective resource available under each program, and the resulting level of energy and demand savings. The results of this analysis can be used to examine how DSM program structures impact the decision-making process of federal and large commercial customers.

Stucky, D.J.; Shankle, S.A.; Dixon, D.R.; Elliott, D.B.

1994-12-01T23:59:59.000Z

273

Müller: Modeling the Impact of a Learning Phase on the Business Value of a Pair Programming Project. APSEC 11  

E-Print Network (OSTI)

Abstract. Pair programmers need a ”warmup phase” before the pair can work at full speed. The length of the learning interval varies, depending on how experienced the developers are with pair programming and how familiar they are with each other. We study how large the impact of the lower pair productivity during warmup is on the business value of the pair programming project. To this end, we extend our net present value model for pair programming to explicitly include a learning interval for pairs. We then carry out a simulation study where we vary the shape of the learning curve, the length of the learning interval, the final productivity level of the pairs, the market pressure, and the size of the workforce. Our simulations show that the cost of the warmup phase is reasonably small compared to the project value, but nonetheless must be taken into account when estimating the project. Our results also suggest that the learning overhead is not an obstacle to introducing and using pair programming in a real environment.

Frank Padberg

2004-01-01T23:59:59.000Z

274

Environment, safety, health, and quality plan for the TRU- Contaminated Arid Soils Project of the Landfill Stabilization Focus Area Program  

SciTech Connect

The Landfill Stabilization Focus Area (LSFA) is a program funded by the US Department of Energy Office of Technology Development. LSFA supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The TRU-Contaminated Arid Soils project is being conducted under the auspices of the LSFA Program. This document describes the Environment, Safety, Health, and Quality requirements for conducting LSFA/Arid Soils activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to LSFA/Arid Soils operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and system and performance audits as they apply to the LSFA Program.

Watson, L.R.

1995-06-01T23:59:59.000Z

275

Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report  

Science Conference Proceedings (OSTI)

This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.

Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

2008-04-08T23:59:59.000Z

276

Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2007 Budget Request (GPRA 2007)  

SciTech Connect

This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2007 Budget Request.

Sheehan, J.

2006-03-01T23:59:59.000Z

277

Coal Air Turbine ``CAT`` program invention 604. Eighth quarter project report and final for the project, August--September 1996  

SciTech Connect

The primary objective of this ``CAT`` project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the ``CAT`` system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a ``CAT`` plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a ``commercial plant`` before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

Foster-Pegg, R.W.

1996-09-30T23:59:59.000Z

278

Status of Offshore Wind Energy Projects, Policies and Programs in the United States  

SciTech Connect

This paper provides the status of the offshore wind energy project proposals in the United States and describes strategic issues faced by the U.S. wind industry.

Musial, W.; Ram, B.

2008-01-01T23:59:59.000Z

279

Colorado State University program for developing, testing, evaluating and optimizing solar heating systems. Project status report, October 1995--November 1995  

DOE Green Energy (OSTI)

This document is the October/November 1995 project status report of the Colorado State University Program for developing, testing, evaluating and optimizing solar heating systems. Integrated tank/heat exchanger modeling is discussed, as well as advanced residential solar hot water systems. A paper to be presented at the 1996 International Solar Energy Conference is included. The subject of this paper is rating and certification of domestic water heating systems.

NONE

1995-12-01T23:59:59.000Z

280

Fermilab | Directorate | Office of Project Management Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Project Support Services (PSS) Projects Fermilab Scientific and Facility Projects (DOE 413 Projects) Fermilab Programs Fermilab Management Projects OPMO Projects Policies...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Landlord project multi-year program plan, fiscal year 1999, WBS 1.5  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

Dallas, M.D.

1998-09-22T23:59:59.000Z

282

Supplemental Comprehensive Report to Congress - Clean Coal Technology Program. Tidd Pressurized Fluidized Bed Combustion (PFBC) Project  

SciTech Connect

The Department of Energy (DOE) in February 1987 submitted a Comprehensive Report to Congress for a Clean Coal Technology (CCT) project entitled {open_quotes}Tidd PFBC (Pressurized Fluidized Bed Combustion) Demonstration Project.{close_quotes} In that document, DOE reported to Congress that the Government share of project costs would be $60,200,000 and that the participant agreed to absorb any cost overruns, even though the public law contained provisions which would allow DOE to share in project cost growths up to 25 percent of the original financial assistance. This Supplemental Report is being submitted because DOE now intends to increase its contribution to the project by approximately 11 percent to facilitate extension of the original 3-year operating period by one additional year. DOE`s overall percentage cost share resulting from this extension will not exceed DOE`s overall percentage cost share in the original agreement.

Not Available

1994-03-01T23:59:59.000Z

283

Science Fair Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Fair Projects NEWTON Ask A Scientist program is not designed to provide science fair ideas or deal with individual project problems. Our program is designed to answer...

284

(SSS)Project Dashboard 2013-06-25.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment Cost Performance Schedule Performance Project Dashboard...

285

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network (OSTI)

to the western Pacific alternative energy development. Thisgrant to provide an alternative energy educational program,and promoting alternative energy technologies in homes and

Case, C.W.

2011-01-01T23:59:59.000Z

286

Technical Analysis of Projects Being Funded by the DOE Hydrogen Program  

DOE Green Energy (OSTI)

In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

Edward G. Skolnik

2006-02-10T23:59:59.000Z

287

Advanced Wind Turbine Program Next Generation Turbine Development Project: June 17, 1997--April 30, 2005  

Science Conference Proceedings (OSTI)

This document reports the technical results of the Next Generation Turbine Development Project conducted by GE Wind Energy LLC. This project is jointly funded by GE and the U.S. Department of Energy's National Renewable Energy Laboratory.The goal of this project is for DOE to assist the U.S. wind industry in exploring new concepts and applications of cutting-edge technology in pursuit of the specific objective of developing a wind turbine that can generate electricity at a levelized cost of energy of $0.025/kWh at sites with an average wind speed of 15 mph (at 10 m height).

GE Wind Energy, LLC

2006-05-01T23:59:59.000Z

288

Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report  

DOE Green Energy (OSTI)

The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

Lunis, B.C.

1986-01-01T23:59:59.000Z

289

Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request  

SciTech Connect

This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

Not Available

2007-03-01T23:59:59.000Z

290

Factors to improve project performance : lessons from a Chilean urban agriculture program  

E-Print Network (OSTI)

This thesis investigates a Chilean urban agriculture project that has been underway for more than twenty years in Tome, a small coastal town located near the regional capital of Concepcion. Initiated in the early 1980s by ...

Scott, Maggie, 1975-

2003-01-01T23:59:59.000Z

291

Electric and Magnetic Fields (EMF) RAPID Engineering Program, Project 7: Development of Field Exposure Models  

Science Conference Proceedings (OSTI)

The purpose of this project was to develop a conceptual model for estimating magnetic field (EMF) personal exposure (PE) of individuals or groups and construct a working model using existing data.

Bracken, T.D.; Rankin, R.F.; Wiley, J.A.

1999-05-01T23:59:59.000Z

292

DOE Order Program and Project Management for the Acquisition of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE))

The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan...

293

Energy Conservation Recommendations, Implementation Costs, and Projected Paybacks for Georgia's Targeted Schools and Hospitals Conservation Program  

E-Print Network (OSTI)

During the past year the Georgia Tech Research Institute performed technical assistance studies on over 100 school and hospital buildings under a program funded by the Governor's Office of Energy Resources. This program is known as the Targeted Schools and Hospitals Program because its objective is to involve facilities which have never participated in the traditional DOE funded Institutional Conservation Program (ICP) due to economic hardships. The program was specifically directed at non-participants by providing fully funded energy surveys on qualifying facilities. The energy surveys were conducted by the Georgia Tech Research Institute under contract with the Office of Energy Resources. This paper presents results on the range of energy conservation recommendations made and the number of occurrences in the total population as well as the typical percentage energy savings. This data can be used in forecasting the expected types of recommendations and energy reduction potential for a large population of institutional buildings.

Brown, M. L.; Moore, D. M.

1988-01-01T23:59:59.000Z

294

Solar Radiation Resource Assessment Project. Program overview of fiscal year 1993  

DOE Green Energy (OSTI)

The mission of the Solar Radiation Resource Assessment Project is to provide essential information about the solar radiation resource to users and planners of solar technologies so that they can make informed and timely decisions concerning applications of those technologies. The project team accomplishes this by producing and disseminating relevant and reliable information about solar radiation. Topics include: Variability of solar radiation, measurements of solar radiation, spectral distribution of solar radiation, and assessment of the solar resource. FY 1993 accomplishments are detailed.

Not Available

1994-06-01T23:59:59.000Z

295

The Enbridge Consumers Gas "Steam Saver" Program ("As Found" Performance and Fuel Saving Projects from Audits of 30 Steam Plants)  

E-Print Network (OSTI)

In Canada, medium and large sized steam plants consume approximately 442 Billion Cubic Feet (12.5 Billion Cubic Meters) of natural gas annually. This is 25% of all natural gas delivered to all customers. (Small steam plants and Hydronic heating boilers consume another 15%) Enbridge Consumers Gas, a local gas distribution company located in Toronto, has approximately 400 Industrial and Institutional customers who own medium or large sized steam plants. During the past three years, Enbridge has developed a comprehensive steam energy efficiency program called "Steam Saver". This program is aimed at these 400 customers. The heart of this program is the boiler plant audit and performance test. This paper describes the fuel saving results for more than 30 medium and large sized boiler plants where audits have been completed and projects have been implemented. The savings in cubic feet per year of natural gas are broken down according to project or technology type. The financial payback is indicated for each category. Eleven of the larger plants have been "benchmarked". Plant efficiency, fuel consumption, steam costs and other performance variables are tabulated for these plants.

Griffin, B.

2000-04-01T23:59:59.000Z

296

Effective real-world project collaboration: Strategies from a cyber security degree program  

Science Conference Proceedings (OSTI)

The undergraduate degree of computer and cyber security has been offered at the School of Information Technology, Phetchaburi Rajabhat University, Thailand since 2005. Our program requires direct field experience when students are taking upper-level ...

Wajee Chookittikul; Peter E. Maher

2011-05-01T23:59:59.000Z

297

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network (OSTI)

ol8GY PILOT PROGRAM- PART I DOE APPROPRIATE ENERG c. w. , F.the Department of Energy- DOE), responding to the 1977 ERDAto a company or product name does not imply approval or

Case, C.W.

2011-01-01T23:59:59.000Z

298

Colorado State University Program for developing, testing, evaluating and optimizing solar heating systems. Project status report for the months of June and July 1995  

DOE Green Energy (OSTI)

A project status report for the months of June and July 1995, is given on the Colorado State University program for developing, testing, evaluating, and optimizing solar heating systems.

NONE

1995-08-01T23:59:59.000Z

299

DOE Hydrogen and Fuel Cells Program Record 13013: Hydrogen Delivery Cost Projections - 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

3013 Date: September 26, 2013 3013 Date: September 26, 2013 Title: H 2 Delivery Cost Projections - 2013 Originator: E. Sutherland, A. Elgowainy and S. Dillich Approved by: R. Farmer and S. Satyapal Date: December 18, 2013 Item: Reported herein are past 2005 and 2011 estimates, current 2013 estimates, 2020 projected cost estimates and the 2015 and 2020 target costs for delivering and dispensing (untaxed) H 2 to 10%- 15% of vehicles within a city population of 1.2M from a centralized H 2 production plant located 100 km from the city gate. The 2011 volume cost estimates are based on the H2A Hydrogen Delivery Scenario Analysis Model (HDSAM) V2.3 projections and are employed as the basis for defining the cost and technical targets of delivery components in Table 3.2.4 in the 2012 Delivery

300

A program to develop the domestic natural gas industry in Indonesia: Case history of two World Bank projects  

Science Conference Proceedings (OSTI)

Indonesia depends heavily on revenues from the export of LNG and oil, the availability of which appears to be decreasing. It is therefore making a strong effort to accelerate development of a domestic natural gas industry. A high priority has been given to the conversion of power plants and city gas systems, including local industries and commercial facilities, from liquid fuels to natural gas. This will release more oil for export, help to meet the objectives of Repelita V, and provide substantial environmental benefits. The World Bank recently provided loans to the Indonesian Government for two projects that are aimed at substituting natural gas for oil and manufactured gas in domestic markets. One project involves expansion of the gas distribution systems of Indonesia's natural gas utility (PGN) in three cities: Jakarta and Bogor in Java, and Medan in Sumatra. The project also includes training programs for PGN staff and an energy pricing policy study to be carried out by Indonesia's Ministry of Mines and Energy. The second project involves expansion of the supply of natural gas for Surabaya and twelve other towns in its vicinity in East Java, and further expansion of Medan's supply system. Technical assistance will be provided to enhance the skills ofPGN and the Ministry of Mines and Energy, and a Gas Technology Unit similar to the Institute of Gas Technology will be established at Indonesia's Research and Development Center for Oil and Gas (LEMIGAS) in Jakarta. 14 refs., 3 figs., 11 tabs.

Klass, D.L. (Institute of Gas Technology, Chicago, IL (United States)); Khwaja, S. (World Bank, Washington, DC (United States))

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Colorado State University program for developing, testing, evaluating and optimizing solar heating and cooling systems. Project status report, March--November 1992  

DOE Green Energy (OSTI)

This program includes six tasks, including (1) a project measuring the performance of unique solar system components, (2) a project to develop a methodology for determining annual performance ratings of solar domestic hot water systems, (3) a project that will identify, analyze, design, build, and experimentally evaluate SDHW systems incorporating advanced concepts and components, (4) a liquid desiccant cooling system development project, (5) a project that will perform TRNSYS simulations to determine potential energy savings for desiccant cooling systems, especially in humid climates, and (6) a management task. The objectives and progress in each task are described.

Not Available

1993-01-07T23:59:59.000Z

302

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

Wind Powering America (EERE)

5 - January 2010 5 - January 2010 Two 600-kW wind turbines were installed on Deer Island in August 2009 next to the wastewater treatment facility's anaerobic digesters. Due to their proximity to Logan Airport, these generators were installed on unusually short 32-meter towers. WIND AND HYDROPOWER TECHNOLOGIES PROGRAM continued on page 2 > Kathryn Craddock, Sustainable Energy Advantage, LLC/PIX16710 Wind Projects Sprout Throughout New England NEWF is pleased to provide you with its fifth edition of the electronic NEWF newsletter. This newsletter provides updates on a broad range of project proposals and policy initiatives across New England during the funding hiatus...consider it a "catch-up" double issue. In past newsletters, we've relied on wind farm photo-simulations, photos of early construction

303

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Location: Location: New York Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on aero-thermodynamic Inertial separation for use in carbon capture processes.' Categorical Exclusion(s) Applied: x - 83.6 Siting/constructiOnloperationtdecommissioning of facilities for benctrscale research, conventionallaboralory operations, small-scala research and development and pilot projects *-For the complete DOE National Euyironmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 [lkk Here lois action vr'Ould not: threaten a violation of applicable statutory, regulatory, or pennit requirements for environment, safety, and health, including OOE andlor Executive Orders;

304

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR PORTS-2012-09-24 HIAR PORTS-2012-09-24 Site: Portsmouth Gaseous Diffusion Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System (CAS) Program Dates of Activity : 09/24/12 - 10/04/12 Report Preparer: Joseph P. Drago Activity Description/Purpose: The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy:

305

Project RU LlSON COPY ON-SITE RADIOLOGICAL PROGRAMS DURING REENTRY DISILLING THROUGH PRODUCTION TESTING  

Office of Legacy Management (LM)

RU LlSON RU LlSON COPY ON-SITE RADIOLOGICAL PROGRAMS DURING REENTRY DISILLING THROUGH PRODUCTION TESTING FINAL REPOAT EBERLlNE INSTRUMENT CORPORATION Santa Fe, New Mexico Date Published - December 1973 PREPARED FOR THE U. S. ATOMIC ENERGY COMMISSION N E V A D A OPERATIONS OFFICE UNDER CONTRACT NO. AT(26-11-294 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. Project RULISON ON-S1l'E RADIOLOGICAL PROGRAMS D U R I N G R E E N T R Y D R I L L I N G THROUGH PRODUCTION TESTING \ F I N A L REPORT EBERLINE INSTRUMENT CORPORATION . Santa Fe, New Mexico 1 Date Published - December 1973 NEVADA OPERATIONS OFFICE . UNDER CONTRACT NO. AT(26-11-294 NOTICE ~~~~ This report was prepared as an account of work sponsored by the United

306

Program Director/Principal Investigator (Last, First, Middle): BUDGET FOR ENTIRE PROPOSED PROJECT PERIOD  

E-Print Network (OSTI)

PROJECT PERIOD DIRECT COSTS ONLY BUDGET CATEGORY TOTALS INITIAL BUDGET PERIOD (from Form Page 4) 2nd organization only. CONSULTANT COSTS EQUIPMENT SUPPLIES TRAVEL INPATIENT CARE COSTS OUTPATIENT CARE COSTS ALTERATIONS AND RENOVATIONS OTHER EXPENSES DIRECT CONSORTIUM/ CONTRACTUAL COSTS SUBTOTAL DIRECT COSTS (Sum

Bandettini, Peter A.

307

Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program  

DOE Green Energy (OSTI)

The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

None

1976-11-01T23:59:59.000Z

308

LIGHTING RESEARCH PROGRAM Project 4.5 Integrated Classroom Lighting System  

E-Print Network (OSTI)

lighting system must be flexible and able to adjust to different daylight conditions. Adding automated levels based on the amount of daylight in the classroom. The system should use a separate switch for each the ICLS that was developed in Project 4.5. - Luminaires: i. An indirect luminaire with an optical system

309

United States Gulf Coast geopressured geothermal program. Special projects research and coordination assistance. Final report, 1 December 1978-30 October 1980  

DOE Green Energy (OSTI)

Work for the period, December 1, 1978 through October 31, 1980, is documented. The following activities are covered: project technical coordination assistance and liaison; technical assistance for review and evaluation of proposals and contract results; technical assistance for geopressured-geothermal test wells; technical assistance, coordination, and planning of surface utilization program; legal research; and special projects. (MHR)

Dorfman, M.H.; Morton, R.A.

1981-06-01T23:59:59.000Z

310

Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4  

SciTech Connect

The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

Denning, J.L.

1994-09-01T23:59:59.000Z

311

Transportation energy strategy: Project {number_sign}5 of the Hawaii Energy Strategy Development Program  

Science Conference Proceedings (OSTI)

This study was prepared for the State Department of Business, Economic Development and Tourism (DBEDT) as part of the Hawaii Energy Strategy program. Authority and responsibility for energy planning activities, such as the Hawaii Energy Strategy, rests with the State Energy Resources Coordinator, who is the Director of DBEDT. Hawaii Energy Strategy Study No. 5, Transportation Energy Strategy Development, was prepared to: collect and synthesize information on the present and future use of energy in Hawaii`s transportation sector, examine the potential of energy conservation to affect future energy demand; analyze the possibility of satisfying a portion of the state`s future transportation energy demand through alternative fuels; and recommend a program targeting energy use in the state`s transportation sector to help achieve state goals. The analyses and conclusions of this report should be assessed in relation to the other Hawaii Energy Strategy Studies in developing a comprehensive state energy program. 56 figs., 87 tabs.

NONE

1995-08-01T23:59:59.000Z

312

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

313

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

314

Seismic signal location program for the Los Alamos Scientific Laboratory's dry hot rock geothermal project  

DOE Green Energy (OSTI)

During hydraulic fracturing, seismic signals produced as the fracture grows may be used to determine orientation, size, and shape of the fracture. This seismic signal location program has been written to utilize such signals, along with an experimentally determined seismic velocity model to help determine the fracture orientation, size, and shape.

Kintzinger, P.R.

1976-03-01T23:59:59.000Z

315

LIGHTING RESEARCH PROGRAM Project 4.2 The ENERGY STAR Residential Light  

E-Print Network (OSTI)

Lite; Jeremy Bloom, EPRI; David Shiller, EPA. Program Advisory Committee: Ron Lewis, Department required for steel versus plastic parts. 3. UV Stability #12;ICLS Final Report Architectural Energy that the luminaire would not spread a fire from one part of the classroom to another. 5. Temperature stability

316

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16) Penn State Univ. - 16) Penn State Univ. - Development of Rhodobacter as a Versatile Microbial Platform for Fuels Production Location: Pennsylvania Proposed Action or Project Description: American Recovcf)' and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on a rhodobacter fuel production platform for use in the production of energy dense, liquid transportation fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x w 83.6 SiUng/constructionloperationldecommission!ng of facilities for bench-scale research, convenUooallaboratory operations. small-scale research and development and pilot projects O+~For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 ('tick Here

317

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) Regents of the Univ. of California - 3) Regents of the Univ. of California - Electro-Autotrophic Synthesis of Higher Alcohols Location: California Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on electro-autotrophic synthesis for use in the production of energy dense, liquid transpcrtatlon fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x - 83.6 SitingJoonstructlonfoperationldecommissioning of facilities for bench-scale research, conventionallaboralory operations, small-scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRlO 21 Click I !ere

318

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project T Project T itle: (02 06- 1565) Columbia - Biofue ls from C02 using Amm onia-Oxid izing Bacte ria in a Reve rse Microbi a l Fue l Cell L ocati on: New Y ork Pr oposed Action or Proj ect Description: American Recovery and Reinvestment Act: D Funding will support in-lab R&D activities involving liquid biofuel production from biological-based non-photosynthetic systems. Proposed work consists of (1) initial testing and genetic modification of ammonia-oxidizing and iron-oxidizing bacteria used to produce liquid biofuel and (2) development and optimization of a reverse microbial fuel cel l. All proposed work will take place on the Columbia University campus in New York, NY. Categorical Exciusi on(s) Applied: x - 83.6 Siting/construction/operation/decommissioning of facilities for bench-scale research, conventional laboratory operations, small-scale research and developme

319

Turbine Research Program Cold Weather Turbine Project: Period of Performance May 27, 1999 -- March 31, 2004  

DOE Green Energy (OSTI)

Northern Power Systems completed the Cold Weather Turbine (CWT) project, which was funded by the National Renewable Energy Laboratory (NREL), under subcontract XAT-9-29200-01. The project's primary goal is to develop a 100-kW wind turbine suited for deployment in remote villages in cold regions. The contract required testing and certification of the turbine to the International Electrotechnical Commission (IEC) 61400-1 international standard through Underwriters Laboratories (UL). The contract also required Northern Power Systems to study design considerations for operation in extreme cold (-80F at the South Pole, for example). The design was based on the successful proof of concept (POC) turbine (developed under NREL and NASA contracts), considered the prototype turbine that would be refined and manufactured to serve villages in cold regions around the world.

Lynch, J.; Bywaters, G.; Costin, D.; Hoskins, S.; Mattila, P.; Stowell, J.

2004-08-01T23:59:59.000Z

320

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network (OSTI)

rules pertaining to what project costs should and should notless than total installed project costs, with the differenceof total installed project costs). Capacity factor is simply

Bolinger, Mark

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Control Center Application Program Interface (CCAPI) Project: API Standard Proposal Requirements for Generic Interface Definition (GID)  

Science Conference Proceedings (OSTI)

The Control Center Application Program Interface (CCAPI) Task Force is charged with producing design criteria for international energy management system (EMS) standards. Their aim is to integrate independently developed EMS applications. The resulting standards will provide utilities with competitive choices in the design of their control systems, while offering less expensive applications to meet the needs of the rapidly changing electric power industry. The initial Task Force deliverable was the Common...

2001-11-29T23:59:59.000Z

322

Final Report: Planetary Instrument Definition and Design Program (PIDDP) Support Project  

SciTech Connect

The results of Sandia National Laboratories' participation in the NASA Planetary Definition and Design Program are summarized. Areas reported include the characterization of large area cadmium zinc telluride spectrometers and the application of simulation techniques to the prediction of device performance. Also investigated was the response of mercuric iodide devices in the region from 1 to 100 KeV. A literature study to determine the status or radiation damage measurements in room temperature semiconductor devices is also reported.

L. A. Franks; R. B. James

1999-03-01T23:59:59.000Z

323

Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs: FY 2004 Budget Request  

DOE Green Energy (OSTI)

The Office of Energy Efficiency and Renewable Energy (EERE) of the U.S. Department of Energy (DOE) leads the Federal Government's efforts to provide reliable, affordable, and environmentally sound energy for America, through its research, development, and deployment (RD&D) programs. EERE invests in high-risk, high-value research and development (R&D) that, conducted in partnership with the private sector and other government agencies, accelerates the development and facilitates the deployment of advanced clean energy technologies and practices. The RD&D activities of EERE are designed to improve the nation's readiness to address future energy needs. This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2004 Budget Request. EERE is adopting a benefits framework developed by the National Research Council (NRC) to represent the various types of benefits resulting from the energy efficiency technology improvements and renewable energy technology development prompted by EERE programs. Specifically, EERE's benefits analysis focuses on three main categories of energy-linked benefits-economic, environmental, and security. These measures are not a complete representation of the benefits or market roles of efficiency and renewable technologies, but provide an indication of the range of benefits provided.

National Renewable Energy Laboratory

2004-04-01T23:59:59.000Z

324

Federal Energy Management Program technical assistance case study: The Forrestal Building relighting project saves $400K annually  

SciTech Connect

The US Department of Energy (DOE) believes energy efficiency begins at home -- in this case the James A. Forrestal Building in Washington, D.C. Since 1969, the 1.7 million-square-foot Forrestal Building has served as DOE Headquarters. In 1989, a team of in-house energy specialists began searching for opportunities to make the Forrestal Building more energy efficient. The team, on which personnel from the Federal Energy Management Program (FEMP) served, identified lighting as an area in which energy use could be reduced substantially. A monitoring program showed that the building`s more than 34,000 1-foot by 4-foot fluorescent lighting fixtures were responsible for 33% of the building`s total annual electric energy use, which represents more than 9 million kilowatt-hours (kWh) per year. In initiating the relighting program, DOE hoped to achieve these broad goals: Reduce energy use and utility bills, and improve lighting quality by distributing the light more uniformly. Funding was also an important consideration. DOE sought financing alternatives through which the lighting retrofit is paid for without using government-appropriated capital funds. DOE cut lighting costs more than 50% and paid for the project with the money saved on energy bills.

1997-01-01T23:59:59.000Z

325

Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program  

Science Conference Proceedings (OSTI)

This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

Watkins, D.R.; Ammons, J.T.; Branson, J.L. [and others

1993-10-01T23:59:59.000Z

326

Cesium Ion Exchange Program at the Hanford River Protection Project Waste Treatment Plant  

SciTech Connect

The Hanford Waste Treatment and Immobilization Plant (WTP) will use cesium ion exchange to remove Cs-137 from Low Activity Waste (LAW) down to a maximum activity of 0.3 Ci/m3 in the Immobilized LAW (ILAW) product. The WTP Project baseline for cesium ion exchange is the elutable SuperLig(R) 644 (SL-644) resin (registered trademark of IBC Advanced Technologies, Inc., American Fork, UT) or a U. S. Department of Energy (DOE) approved equivalent. SL-644 is solely available through IBC Advanced Technologies. The WTP Project is conducting a three-stage process for selecting and qualifying an alternative ion exchange resin. Resorcinol formaldehyde (RF) is being pursued as a potential alternative to SL-644, to provide a backup resin supply. Resin cost relative to SL-644 is a primary driver. Phase I of the testing plan examined the viability of RF resin and recommended that a spherical form of RF resin be examined further. Phases II and III, now underway, include batch testing to determine the isotherm of this resin, kinetics to address the impacts of bead diameter and high sodium feed levels on processing Hanford waste with the resin, and multicycle column testing to determine how temperature and chemical cycling affects waste processing. Phases II and III also examine resin performance against simulated WTP feeds, radiolytic and thermal stability, and scale-up to pilot scale performance. We will discuss early results obtained from Phase II testing here.

CHARLES, NASH

2005-02-27T23:59:59.000Z

327

Monitoring Electricity Consumption in the Tertiary Sector- A Project within the Intelligent Energy Europe Program  

E-Print Network (OSTI)

The electricity consumption in the tertiary sector in the EU is still increasing and a further increase is expected of more than 2 % per year during the next 15 years. This sector includes companies and institutions of public and private services with heterogeneous economic and energy-related characteristics. Building managers and decision-makers are not enough informed about the electricity consumption structure and electricity-saving potentials. Within the EU Intelligent Energy project EL-TERTIARY an overview of existing studies showed that the availability of disaggregated data on electricity consumption and its use by purpose (lighting, office equipment, ventilation, air conditioning, etc.) is poor. The methods of determining the types of end-uses are weak; most studies are based on calculations and estimations, only a few on measurement. In addition, many of the results are not published. EL-TERTIARY developed an internet-based methodology for monitoring electricity consumption. It was applied in more than 120 case studies in 12 EU countries. They cover various types of buildings: offices, schools, universities, kindergartens, hotels, supermarkets, and hospitals evaluating more than 900 technical systems. On the background of ongoing activities on EU level, such as directives, research and implementation projects the paper illustrates the concept of EL-TERTIARY, the newly developed methodology for the documentation of building audits and monitoring as well as selected results.

Plesser, S.; Fisch, M. N.; Gruber, E.; Schlomann, B.

2008-10-01T23:59:59.000Z

328

Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.  

DOE Green Energy (OSTI)

This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

United States. Bonneville Power Administration.

1995-03-01T23:59:59.000Z

329

Wabash River Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program. Environmental Assessment  

Science Conference Proceedings (OSTI)

The proposed project would result in a combined-cycle power plant with lower emissions and higher efficiency than most existing coal-fired power plants of comparable size. The net plant heat rate (energy content of the fuel input per useable electrical generation output; i.e., Btu/kilowatt hour) for the new repowered unit would be a 21% improvement over the existing unit, while reducing SO{sub 2} emissions by greater than 90% and limiting NO{sub x} emissions by greater than 85% over that produced by conventional coal-fired boilers. The technology, which relies on gasified coal, is capable of producing as much as 25% more electricity from a given amount of coal than today`s conventional coal-burning methods. Besides having the positive environmental benefit of producing less pollutants per unit of power generated, the higher overall efficiency of the proposed CGCC project encourages greater utilization to meet base load requirements in order to realize the associated economic benefits. This greater utilization (i.e., increased capacity factor) of a cleaner operating plant has global environmental benefits in that it is likely that such power would replace power currently being produced by less efficient plants emitting a greater volume of pollutants per unit of power generated.

Not Available

1993-05-01T23:59:59.000Z

330

Project Listings by Organization; DOE Hydrogen Program FY 2008 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2008 Annual Progress Report DOE Hydrogen Program 3M Company V.C.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .861 V.G.5 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .962 V.G.8 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 978 A Mountain Top, LLC X.8 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1275 Addison Bain VIII.6 Hydrogen Safety Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1202

331

Project Listings by Organization; DOE Hydrogen Program FY 2009 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2009 Annual Progress Report DOE Hydrogen Program 3M Company V.D.11 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1034 V.D.13 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1042 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1065 A Mountaintop LLC VII.1 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1267 Acumentrics Corporation V.I.5 Development of a Low Cost 3-10 kW Tubular SOFC Power System . . . . . . . . . . . . . . . . . . . . . . . . . . 1141 Addison Bain IX.7 Hydrogen Safety Panel

332

Project Listings by State, excerpt from DOE Hydrogen Program 2006 Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 FY 2006 Annual Progress Report DOE Hydrogen Program Alabama IV.B.4k Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . .429 V.C.5 Development of High-Performance, Low-Pt Cathodes Containing New Catalysts and Layer Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 787 V.F.4 Smart Energy Management of Multiple Fuel Cell Powered Applications . . . . . . . . . . . . . . . . . . . . . . . .862 Arizona II.B.11 Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .83 II.C.8 Zeolite Membrane Based Shift Reactor . . . . . . . . . . . . . . . . .

333

Project Listings by State; DOE Hydrogen Program FY 2008 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 FY 2008 Annual Progress Report DOE Hydrogen Program Alabama IV.B.1i University of Alabama: Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .592 V.H.1 CFD Research Corporation: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 V.H.1 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 Alaska II.C.3 University of Alaska: Development of a Novel Efficient Solid-Oxide Hybrid for Co-Generation of Hydrogen and Electricity Using Nearby Resources for Local Application .

334

Project Listings by Organization, DOE Hydrogen Program FY 2010 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

33 33 FY 2010 Annual Progress Report DOE Hydrogen Program 3M Company V.D.2 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .748 V.D.7 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .772 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .790 V.E.6 Durable Catalysts for Fuel Cell Protection during Transient Conditions. . . . . . . . . . . . . . . . . . . . . . . . .825 V.E.8 Nanosegregated Cathode Alloy Catalysts with Ultra-Low Platinum Loading. . . . . . . . . . . . . . . . . . . . .835

335

Seismic Safety Margins Research Program (Phase I). Project IV. Structural building response; Structural Building Response Review  

Science Conference Proceedings (OSTI)

As part of the Phase I effort of the Seismic Safety Margins Research Program (SSMRP) being performed by the University of California Lawrence Livermore Laboratory for the US Nuclear Regulatory Commission, the basic objective of Subtask IV.1 (Structural Building Response Review) is to review and summarize current methods and data pertaining to seismic response calculations particularly as they relate to the objectives of the SSMRP. This material forms one component in the development of the overall computational methodology involving state of the art computations including explicit consideration of uncertainty and aimed at ultimately deriving estimates of the probability of radioactive releases due to seismic effects on nuclear power plant facilities.

Healey, J.J.; Wu, S.T.; Murga, M.

1980-02-01T23:59:59.000Z

336

Program or Field Office: Project Title and I. D. No.: Locatio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

337

Program or Field Office: Project Title and I.D. No.:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

338

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pro Pro ject Title: (02 06-1510) UMass - Electrofu els via Direct Electron Transfer from Electrod es to Microbes" Location: *- Multiple States - California, Massachusetts Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support R&D activities involving microbial electrosynthesis of liquid biofuel and biofu el precursors in in-lab and meso-scale bioreactors. Proposed work consists of increasing liquid biofuel and biofuel precursor production in three target microbes usi ng adaptive evolution, genetic engineering , and metabolic modeling techniques at UMass's research facilities in Amhearst, MA. Proposed work also consists of designing, fabricating, and optimizing three in-lab bioreactors and one meso-scale bioreactor at Genomatica, Inc.

339

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L L ocation: *- Multiple States - New York, Pennsylvania Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support small-scale laboratory research , design, fabrication and pilot-sca le testing of the Inertial C02 Extraction System (ICES), an aero-thermodynamic inertial separation device for use in carbon capture processes. Funding will also support computationa l and performance modeling, econom ic modeling, and commercialization/transition planning for the IC ES system under development. Proposed work consists of (1) R&D tasks to be completed in laboratory, fabrication and testing facilities located at ATK's GAS L testing and research center in Ronkonkoma, NY, (2) Technical performance modeling and design work at Acent Laboratories in Manorville, NY, and

340

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

342

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

343

Pinellas, Former Production Workers Screening Projects | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas, Former Production Workers Screening Projects Pinellas, Former Production Workers Screening Projects Project Name: National Supplemental Screening Program Covered DOE...

344

Solar-MEC development program. Project 9103 semiannual progress report, September 1, 1977-February 28, 1978  

DOE Green Energy (OSTI)

Progress on the development of the Solar-MEC desiccant cooling system is reported. Specifically, the dynamic performance of a supported molecular-sieve, regenerative, heat and mass exchanger is reported, under input conditions typical of the operation of a solar-powered open desiccant cooling system. Comparisons of the above experimental data with a computer model describing the dynamic processes of air drying and desiccant regeneration of the Solar-MEC desiccant cooling system are reported. An account of the test setup, of the experimental program, and the results of diagnostic steps to evaluate air leakage rates within the Solar-MEC system and actions to minimize such leakage are reported. The test design and experimental approach to verify the performance of the rotary regenerative (sensible) heat exchanger are reported.

Wurm, J.; Weil, S.A.; Wright, L.R.

1979-01-01T23:59:59.000Z

345

RECIPIENT:Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada State Office of Energy STATE:NV Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program - Enigma Energy TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA"()000052 DE-EE-OOOOO84 GFO-0000084-012 EE84 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the foUowmg determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders. owners, consultants. designers). organizations (such as utilities). and state

346

New England Wind Forum: A Wind Powering America Project - Newsletter #6 - September 2010, (NEWF), Wind and Water Power Program (WWPP)  

Wind Powering America (EERE)

6 - September 2010 6 - September 2010 WIND AND WATER POWER PROGRAM PIX 16204 New England and Northeast Look to the Horizon...and Beyond, for Offshore Wind In early December, Boston hosted the American Wind Energy Association's second annual Offshore Wind Project Workshop. U.S. and European offshore wind stakeholders convened to discuss the emerging U.S. offshore wind industry and provided evidence of a significant increase in activity along the Atlantic Coast from the Carolinas to Maine. The wind power industry and policymakers are looking to offshore for long-term growth, driven by aggressive policy goals, economic develop- ment opportunities, a finite set of attractive land-based wind sites, and immense wind energy potential at a modest distance from major population centers.

347

Nuclear Power 2010 Program Lessons Learned Report on the Combined Construction and Operating License/Design Certification Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report August 30, 2012 Prepared by Longenecker and Associates DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

348

Solar-MEC Development Program. Project 61019 final report, September 1, 1977-March 9, 1982  

DOE Green Energy (OSTI)

The Solar-MEC is an open-cycle, solid-desiccant solar-powered, heating/cooling system. Its development has been under way since 1974 under sponsorship of the National Science Foundation, the American Gas Association, and several private companies within the gas industry. The results, conclusions, and recommendations of the program are presented. All laboratory testing and evaluations carried out in support of the conceptual and engineering design and fabrication of an ''improved'' Solar-MEC (System III) unit are described. The performance of the ''improved'' Solar-MEC (System III) unit was evaluated in detail in the laboratory, under full-, part-, and overload conditions of weather; the results were used to develop a characteristic model and computer program for the System III unit. This model was subsequently used to carry out seasonal performance simulations for heating and cooling in six US cities to develop optimized operating control strategies for maximum efficiency with reasonable controls system complexity and, therefore, reasonable costs. The demonstrated improved performance of this new unit (System III) includes: cooling thermal COP of 0.50 under ARI conditions; unit cooling capacity of 2.6 tons under ARI conditions; average Energy Efficiency Ratio (EER) under ARI conditions of 26.5; electric parasitic power requirements (as percent of thermal power input requirements) of only 6.2; and tolerable capacity degradation. On the basis of the results of seasonal performance simulations with the new unit (System III), it was concluded that, for most climates, in order to maximize the system's efficiency for solar cooling at reasonable system complexity, the unit must be designed to operate in the ventilating mode and must be provided with sensing capability to respond to ambient high humidities. The unit must be capable of operating most of the time with combined solar-gas firing and part of the time (only in very humid climates) as a gas-only fired unit.

Kinast, J.A.; Wurm, J.; Zawacki, T.S.; Macriss, R.A.

1985-03-01T23:59:59.000Z

349

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

350

Coal air turbine ``CAT`` program, invention 604. Fifth quarter project report, October--December 1995  

SciTech Connect

The primary objective of this ``CAT`` (Coal Air Turbine) project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the CAT system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a CAT plant are proven, and the integration of the components into a complete plant is the only new developmental activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a commercial plant before the viability of a new concept is accepted. To satisfy this requirement the construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate for a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept. The major components of CAT plants are an air turbine, a heater of compressed air, a coal combustion system, means to recover waste heat and a steam turbine when appropriate. The plant burns raw coal in a fluid bed at atmospheric pressure. The air turbine operates on clean compressed air heated inside tubes immersed in the fluid bed. Progress during the fifth quarter is described.

Foster-Pegg, R.W.

1995-12-31T23:59:59.000Z

351

Federal assistance program. Quarterly project progress report, January 1998--March 1998  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-04-01T23:59:59.000Z

352

Snake River Sockeye Salmon Captive Broodstock Program Research Elements : 2007 Annual Project Progess Report.  

DOE Green Energy (OSTI)

On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes (SBT) and Idaho Department of Fish and Game (IDFG) initiated the Snake River Sockeye Salmon Captive Broodstock Program to conserve and rebuild populations in Idaho. Restoration efforts are focused on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced adults occurred in 1993. The first release of juvenile sockeye salmon from the captive broodstock program occurred in 1994. In 1999, the first anadromous adult returns from the captive broodstock program were recorded when six jacks and one jill were captured at the IDFG Sawtooth Fish Hatchery. In 2007, progeny from the captive broodstock program were released using four strategies: (1) eyed-eggs were planted in Pettit Lake in November; (2) age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in October; (3) age-1 smolts were released into Redfish Lake Creek and the upper Salmon River in May; and (4) hatchery-produced adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2007. Population abundances were estimated at 73,702 fish for Redfish Lake, 124,073 fish for Alturas Lake, and 14,746 fish for Pettit Lake. Angler surveys were conducted from May 26 through August 7, 2007 on Redfish Lake to estimate kokanee harvest. On Redfish Lake, we interviewed 102 anglers and estimated that 56 kokanee were harvested. The calculated kokanee catch rate was 0.03 fish/hour for each kokanee kept. The juvenile out-migrant trap on Redfish Lake Creek was operated from April 14 to June 13, 2007. We estimated that 5,280 natural origin and 14,256 hatchery origin sockeye salmon smolts out-migrated from Redfish Lake in 2007. The hatchery origin component originated from a 2006 fall presmolt direct-release. The juvenile out-migrant traps on Alturas Lake Creek and Pettit Lake Creek were operated by the SBT from April 19 to May 23, 2007 and April 18 to May 29, 2007, respectively. The SBT estimated 1,749 natural origin and 4,695 hatchery origin sockeye salmon smolts out-migrated from Pettit Lake and estimated 8,994 natural origin and 6,897 hatchery origin sockeye salmon smolts out-migrated from Alturas Lake in 2007. The hatchery origin component of sockeye salmon out-migrants originated from fall presmolt direct-releases made to Pettit and Alturas lakes in 2006. In 2007, the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC) chose to have all Snake River sockeye salmon juveniles (tagged and untagged) transported due to potential enhanced survival. Therefore, mainstem survival evaluations were only conducted to Lower Granite Dam. Unique PIT tag interrogations from Sawtooth Valley juvenile out-migrant traps to Lower Granite Dam were utilized to estimate survival rates for out-migrating sockeye salmon smolts. Survival rate comparisons were made between smolts originating from Redfish, Alturas, and Pettit lakes and the various release strategies. Alturas Lake hatchery origin smolts tagged at the out-migrant trap recorded the highest survival rate of 78.0%. In 2007, 494 hatchery origin adult sockeye salmon were released to Redfish Lake for natural spawning. We observed 195 areas of excavation in the lake from spawning events. This was the highest number of redds observed in Redfish Lake since the program was initiated. Suspected redds were approximately 3 m x 3 m in size and were constructed by multiple pairs of adults. To monitor the predator population found within the lakes, we monitored bull trout spawning in Fishhook Creek, a tributary to Redfish Lake; and in Alpine Creek, a tributary to Alturas Lake. This represented the tenth consecutive year that the index reaches have been surveyed on these two streams. Adult counts (41 adults) and redd counts (22 redds

Peterson, Mike; Plaster, Kurtis; Redfield, Laura; Heindel, Jeff; Kline, Paul

2008-12-17T23:59:59.000Z

353

Norfolk Southern boxcar blocking/bracing plan for the mixed waste disposal initiative project. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The US Department of Energy`s (DOE) Environmental Restoration and Waste Management programs will dispose of mixed waste no longer deemed useful. This project is one of the initial activities used to help meet this goal. The project will transport the {approximately}46,000 drums of existing stabilized mixed waste located at the Oak Ridge K-25 Site and presently stored in the K-31 and K-33 buildings to an off-site commercially licensed and permitted mixed waste disposal facility. Shipping and disposal of all {approximately}46,000 pond waste drums ({approximately}1,000,000 ft{sup 3} or 55,000 tons) is scheduled to occur over a period of {approximately}5--10 years. The first shipment of stabilized pond waste should transpire some time during the second quarter of FY 1994. Martin Marietta Energy Systems, Inc., proposes to line each of the Norfolk Southem boxcars with a prefabricated, white, 15-mm low-density polyethylene (LDPE) liner material. To avoid damaging the bottom of the polyethylene floor liner, a minimum .5 in. plywood will be nailed to the boxcars` nailable metal floor. At the end of the Mixed Waste Disposal Initiative (MWDI) Project workers at the Envirocare facility will dismantle and dispose of all the polyethylene liner and plywood materials. Envirocare of Utah, Inc., located in Clive, Utah, will perform a health physic survey and chemically and radiologically decontaminate, if necessary, each of the rail boxcars prior to them being released back to Energy Systems. Energy Systems will also perform a health physic survey and chemically and radiologically decontaminate, if necessary, each of the rail boxcars prior to them being released back to Norfolk Southem Railroad.

Seigler, R.S.

1994-01-01T23:59:59.000Z

354

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

355

Geothermal Loan Guarantee Program: Westmorland Development Project, Imperial County, California: Environmental assessment  

DOE Green Energy (OSTI)

The action assessed is the guaranty of a loan by DOE to finance geothermal exploration, development, and testing by Mapco Geothermal, Inc. and Republic Geothermal, Inc. in the Westmorland area of Imperial County, California. Initial drilling and flow testing of up to three production wells will occur in the exploratory phase. Exploration is proposed for either or both of two portions of the leasehold area. If exploration confirms the presence of a viable resource in the Sweetwater area, the preferred site based on limited temperature data, then up to 19 new production wells and three new injection wells may be drilled and tested there in preparation for the construction of a 55-MW double-flash electric power plant. If, however, the Sweetwater resource proves infeasible, further exploration and possible full-field development may occur instead at the Dearborn-Kalin-Landers area. At this site, up to 19 new production wells and three new injection wells may be drilled and tested, with six existing wells also used for injection. This environmental assessment chiefly addresses effects of the drilling and testing program. In summary, this paper discusses the proposed action, describes the existing environment and discusses the potential environmental impacts. 75 refs. (LSP)

Not Available

1979-04-01T23:59:59.000Z

356

Iowa / Nebraska Distributed Wind Generation Projects First and Second-Year Operating Experience: 1999-2001: U.S. Department of Energ y - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The Wind Turbine Verification Program (TVP) is a collaborative effort of the U.S. Department of Energy (DOE), EPRI, and host utilities to develop, construct, and operate wind power plants. This report describes the first- and second-year operating experience at the 2.25-MW Iowa Distributed Wind Generation Project (IDWGP) in Algona, Iowa, and the 1.5-MW Nebraska Distributed Wind Generation Project (NDWGP) in Springview, Nebraska. The lessons learned in both projects will be valuable to other utilities pla...

2001-12-03T23:59:59.000Z

357

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

358

Colorado State University program for developing, testing, evaluating and optimizing solar heating and cooling systems. Project status report, January--February 1992  

DOE Green Energy (OSTI)

The objective is to develop and test various integrated solar heating, cooling and domestic hot water systems, and to evaluate their performance. Systems composed of new, as well as previously tested, components are carefully integrated so that effects of new components on system performance can be clearly delineated. The SEAL-DOE program includes six tasks which have received funding for the 1991--92 fifteen-month period. These include: (1) a project employing isothermal operation of air and liquid solar space heating systems, (2) a project to build and test several generic solar water heaters, (3) a project that will evaluate advanced solar domestic hot water components and concepts and integrate them into solar domestic hot water systems, (4) a liquid desiccant cooling system development project, (5) a project that will perform system modeling and analysis work on solid desiccant cooling systems research, and (6) a management task. The objectives and progress in each task are described in this report.

Not Available

1992-03-23T23:59:59.000Z

359

Geothermal materials program: strategy. Final report  

DOE Green Energy (OSTI)

The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)

Crane, C.H.; Kenkeremath, D.C.

1980-10-01T23:59:59.000Z

360

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NREL: Education Programs - News  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Programs News Below are news stories involving NREL Education Programs. August 26, 2013 Wind for Schools Project Funding Case Studies This case study look at the project...

362

Development of an EMF Measurments Database, EMF Rapid Program, Project #5, Interim Report: April 1995-December 1996  

SciTech Connect

The EMF Measurements Database project is being implemented by T. Dan Bracken, Inc. as part of the EMF Research and Public Information Dissemination (EMF RAPID) Program. The Database is a collection of data sets that relate to measurement of electric and/or magnetic fields. This report describes activities during the period January 1997 to March 1998. Primary goals for the EMF Measurements Database are to develop a database structure that can accommodate the diversity of EMF data sets, provide guidance for production of future EMF data sets, and serve as an accessible repository of EMF measurement data. Specific objectives of the EMF Measurements Database are: o to presewe study descriptions, results and data; o to provide readily accessible, well-documented data; and - o to facilitate communication among researchers. In addition, the EMF Measurements Database will encourage additional analysis of existing data sets, facilitate analysis of data from multiple projects, support design of new studies, and permit future issues in EMF exposure assessment to be addressed with existing data. Preservation of study descriptions and data is accomplished with a formal, but open, structure. Specifications have been developed for the various elements of the database. Each data set in the database is formally described by a metadata file. The structured metadata file describes the origin, development, logical and physical structure, and distribution mechanism for each data set. The metadata for each data set is generated according to a specification developed for the EMF Measurements Database. The actual measurement data is contained in data products for each data set. The number and type of data product will vary by data set. Most of the data products available from the EMF Measurements Database can be downloaded from an Internet site. For some data sets, the data products will be maintained by other patties who may have their own access procedures.

T. Dan Bracken, Inc.

1998-03-01T23:59:59.000Z

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

364

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

365

Using CORE Model-Based Systems Engineering Software to Support Program Management in the U.S. Department of Energy Office of the Biomass Project: Preprint  

DOE Green Energy (OSTI)

This paper describes how a model-based systems engineering software, CORE, is helping the U. S. Department of Energy's Office of Biomass Program assist with bringing biomass-derived biofuels to the market. This software tool provides information to guide informed decision-making as biomass-to-biofuels systems are advanced from concept to commercial adoption. It facilitates management and communication of program status by automatically generating custom reports, Gantt charts, and tables using the widely available programs of Microsoft Word, Project and Excel.

Riley, C.; Sandor, D.; Simpkins, P.

2006-11-01T23:59:59.000Z

366

Using CORE Model-Based Systems Engineering Software to Support Program Management in the U.S. Department of Energy Office of the Biomass Project: Preprint  

SciTech Connect

This paper describes how a model-based systems engineering software, CORE, is helping the U. S. Department of Energy's Office of Biomass Program assist with bringing biomass-derived biofuels to the market. This software tool provides information to guide informed decision-making as biomass-to-biofuels systems are advanced from concept to commercial adoption. It facilitates management and communication of program status by automatically generating custom reports, Gantt charts, and tables using the widely available programs of Microsoft Word, Project and Excel.

Riley, C.; Sandor, D.; Simpkins, P.

2006-11-01T23:59:59.000Z

367

Programming  

NLE Websites -- All DOE Office Websites (Extended Search)

Programming for Exascale Computers William Gropp and Marc Snir April 15, 2013 Abstract Exascale systems will present programmers with many challenges. We review the...

368

CFO.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Lead Corporate Program Support Team Micheala Brown Team Lead iManage Business IntelligencePortal Team Richard Tomlinson Team Lead Betsy Casaleno Peachy Fry Cathy Lorah...

369

Major Contract Solicitations | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Issuance of Special Notice - Operations and Maintenance Support Services for the iManage Program Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ...

370

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

371

PROJECT RULISON SUMMARY REPORT POST-SHOT A C T I V I T I E S AND. PROGRAMS  

Office of Legacy Management (LM)

SUMMARY REPORT SUMMARY REPORT POST-SHOT A C T I V I T I E S AND. PROGRAMS A p r i l 1 9 7 2 Austral O i l Company Incorporated Houston, Texas TABLE OF CONTENTS I. '-INTRODUCTION 11. LITIGATION 111. RE-ENTRY DRILLING IV. ON-SITE RADIATION MONITORING V. SPECIAL GAS ANALYSES V I . WELL TESTING RESULTS & EVALUATIONS VII . PUBLIC. HEALTH & SAFETY EVAL,UATIONS VIII . HYDROLOGIC EVALUATIONS IX . REFERENCES page Number 1 PROJECT RULISON SUMMARY REPORT POST-SHOT ACTIVITIES AND PROGRAMS I . INTRODUCTION P r o j e c t Rulison was a P l o w s h a r e e x p e r i m e n t t o d e t e r m i n e t h e t e c h n i c a l and economic f e a s i b i l i t y of u s i n g n u c l e a r e x p l o s i v e s t o s t i m u l a t e t h e flow and r e c o v e r y of n a t u r a l g a s f r o m - - t h e Mesa- v e r d e f o r m a t i o n i n t h e Rulison F i e l d , G a r f i e l d C o u n t y , C o l o r a d o . The s u c c e s s f u l d e t o n a t i o n of t

372

DOE/EIS-0265-SA-167: Supplement Analysis for the Watershed Program EIS - Klickitat Watershed Enhancement Project - Klickitat Meadows Restoration (08/09/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2004 9, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-167) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Klickitat Watershed Enhancement Project - Klickitat Meadows Restoration Project No: 1997-056-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams, 1.6 Install Large Woody Debris Structures, 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.17 Rearing Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 7.18 Road Closures, 8.10 Stream Channel Protection

373

DOE/EIS-0265-SA-162: Supplement Analysis for the Watershed Management Program EIS -Libby Creek Lower Cleveland Stabilization Project (07/29/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2004 29, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-162) Ron Morinaka (KEWU - 4) Fish and Wildlife Project Manager - COTR Proposed Action: Libby Creek (Lower Cleveland) Stabilization Project Project No: 199500400 Watershed Management Program (See App. A : Available Management Techniques): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.9 Structural Bank Protection using Bioengineering Methods; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities. Location: On Libby Creek, located about 18 miles southwest of the town of Libby, Montana

374

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

375

Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1  

Science Conference Proceedings (OSTI)

The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

Not Available

1994-09-01T23:59:59.000Z

376

Hanford Area 1990 population and 50-year projections. [Appendix contains computer programming for population projections and graphs showing them by grid areas  

Science Conference Proceedings (OSTI)

The complex and comprehensive safety analysis activities carried out at Hanford for nonreactor nuclear facilities require data from a number of scientific and engineering disciplines. The types of data that are required include data pertaining to current population and population projections. The types of data found in this document include 1990 census totals for residential population within a 50-mile radius of the 100-N, 200, 300, and 400 Area meteorological towers. This document also contains 50-year projections for residential populations within a 50-mile radius of these four meteorological towers. The analysis of population projections indicates that residential population within a 50-mile radius of the four meteorological towers in question will continue to grow through 2040, although at a slower rate each decade. In all cases, the highest growth is projected for the decade ending in the year 2000. The annual growth rate for this period is projected to be 0.646, 0.633, 0.543, and 0.570 in the 100-N, 200, 300, and 400 Areas, respectively. By 2040, these growth rates are projected to drop to 0.082, 0.068, 0.078, 0.078, respectively. 4 refs., 1 figs., 4 tabs.

Beck, D.M.; Scott, M.J.; Shindle, S.F.; Napier, B.A.; Thurman, A.G.; Batishko, N.C. (Pacific Northwest Lab., Richland, WA (United States)); Davis, M.D. (Westinghouse Hanford Co., Richland, WA (United States)); Pittenger, D.B. (Demographics Lab., Olympia, WA (United States))

1991-10-01T23:59:59.000Z

377

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

378

Energy Programs and Projects  

Science Conference Proceedings (OSTI)

... Energy is one of the most critical problems facing the United States, with technical, economic and public policy aspects. ...

2010-09-22T23:59:59.000Z

379

Transportation Programs and Projects  

Science Conference Proceedings (OSTI)

... more. Hydrogen Pipeline Safety Last Updated Date: 01/31/2013 We ... Pipeline Safety Last Updated Date: 11/13/2012 Our goal ...

2010-05-24T23:59:59.000Z

380

Quality Programs and Projects  

Science Conference Proceedings (OSTI)

... of the Xoft miniature x-ray source, which provides low-energy x-rays … more. ... Audit of EPA Protocol Gas Suppliers Last Updated Date: 10/22/2012 ...

2010-05-24T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Nanophysics Programs and Projects  

Science Conference Proceedings (OSTI)

... Structure, Defects, and Scattering in Graphene Last Updated Date: 04/10/2013 ... Theory of Transport in Graphene Last Updated Date: 03/21/2013 ...

2010-05-24T23:59:59.000Z

382

Synchrotron Programs and Projects  

Science Conference Proceedings (OSTI)

... Synchrotron Radiation-Based Calibrations for Space Weather Prediction Last ... NASA launched the Solar Dynamics Observatory ( SDO ) satellite on ...

2010-05-24T23:59:59.000Z

383

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

384

Workforce development through cybersecurity & project ...  

Science Conference Proceedings (OSTI)

... matrix managed, projectized cyber team + Transformation must include a comprehensive education and training program ...

2013-03-28T23:59:59.000Z

385

Lawn chairs in Times Square : an analysis of the Pilot Streets Program and the provisional project approach for New York City's Green Light in Midtown project  

E-Print Network (OSTI)

In 2009 the New York City Department of Transportation (NYC DOT) initiated a Pilot Streets Program that called for the temporary closure of Broadway between 47th and 42nd Streets to all vehicular traffic. With Times Square ...

Taylor, Alexis (Alexis Abreu)

2011-01-01T23:59:59.000Z

386

Materials Reliability Program: South Texas Project Unit 1 Bottom Mounted Instrumentation Nozzles (#1 and #46) Analysis Reports and R elated Documentation (MRP-102)  

Science Conference Proceedings (OSTI)

This technical update documents analysis of two nozzles at South Texas Project Unit 1 that were found to be leaking during a visual inspection of the bottom head of the reactor vessel. The first two sections of this report document research completed by BWXT Services Inc. for Framatome ANP on behalf of South Texas Project Nuclear Operating Company and the EPRI Materials Reliability Program Alloy 600 Issue Task Group. The first section is the analysis of bottom mounted instrument nozzle samples #1 and #46...

2003-12-19T23:59:59.000Z

387

Colorado State University program for developing, testing, evaluating and optimizing solar heating and cooling systems: Project status report for the months of October and November, 1994  

DOE Green Energy (OSTI)

This report describes a project to develop tools for evaluating solar heating and cooling systems. Current work on this project has been to validate the Florida Solar Energy Center`s (FSEC) models of the Solahart 302K and 302K-AS systems to prepare a rating for the Sacramento Municipal Utility District`s rebate program for solar domestic hot water heaters. A preliminary rating has been issued by FSEC and updated ratings will be released as necessary. Two of the problems that were mentioned in the August/September report are addressed and a tank heat loss test is discussed. Work continues on improving and validating the models.

Not Available

1994-12-01T23:59:59.000Z

388

(SSS)Project Dashboard 2013-07-25.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7252013 Office of Management Office of Acquisition and Project Management Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall...

389

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

390

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

391

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

392

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

393

Animation projects in CS1 from scheme to Java  

Science Conference Proceedings (OSTI)

Scheme animation projects are transformed into Java projects. Keywords: computer science for liberal arts, introductory programming course, java programming

Mirela Djordjevi?

2011-06-01T23:59:59.000Z

394

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman August 2013 PNNL- 22653 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman Contributors: SGC Panel Members August 2013 Prepared by: Pacific Northwest National Laboratory and

395

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Jennifer Kurtz (Primary Contact), Keith Wipke, Sam Sprik, Todd Ramsden, Genevieve Saur, and Chris Ainscough National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-4061 Email: jennifer.kurtz@nrel.gov DOE Manager HQ: Sara Dillich Phone: (202) 586-7925 Email: Sara.Dillich@ee.doe.gov Subcontractors: Pacific Northwest National Laboratory, Richland, WA Project Start Date: August 2009 Project End Date: December 2012, with future evaluations covered under DOE's Technology Validation sub-program Objectives Perform an independent assessment of technology in * real-world operation conditions, focusing on fuel cell

396

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

397

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

398

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

399

Comprehensive report to Congress: Clean Coal Technology Program: Arvah B. Hopkins circulating fluidized-bed repowering project: A project proposed by: The City of Tallahassee  

Science Conference Proceedings (OSTI)

The project involves the repowering of a 250-megawatt electrical (MWe) natural gas- or oil-fired boiler with a coal-fired atmospheric circulating fluidized-bed (CFB) boiler to provide steam to an existing turbine generator. The boiler will be the largest of its type. After construction and shakedown, the City of Tallahassee (CoT) plant will be operated for 24 months with at least three different eastern coals. Final coal selection will be based on the Fuels Selection Study, which is part of Phase I-A of the project. Cost, financial, and technical data from the CoT CFB will be provided the utility industry for evaluation of a 250-MWe CFB as a commercially viable clean coal alternative. The objective of the Arvah B. Hopkins CFB Repowering Project is to demonstrate an efficient, economical, and environmentally superior method of generating electric power from coal. The work to be performed under the Cooperative Agreement includes the design, construction, and operation of the demonstration plant. 4 figs.

Not Available

1990-10-01T23:59:59.000Z

400

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

402

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

403

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

404

Lessons Learned at the Iowa and Nebraska Public Power Wind Projects: U.S. Department of Energy - EPRI Wind Turbine Verification Prog ram, American Public Power Association DEED Program  

Science Conference Proceedings (OSTI)

This report describes lessons learned during project development and initial operation of three wind projects owned by public utilities in Iowa and Nebraska. Two are distributed wind generation projects installed in the fall of 1998 as part of the U.S. Department of Energy - EPRI Wind Turbine Verification Program (TVP) in Algona, Iowa, and Springview, Nebraska. The third is Waverly Light and Power's (WLP) Wind Energy Deployment Project installed in early 1999 as part of the 259-turbine Storm Lake Wind Po...

2000-11-30T23:59:59.000Z

405

Reducing Component Systems' Behavior Specification  

E-Print Network (OSTI)

Callback IManagement IIpMacPermDb IpAddressManager DhcpListener TransientIpDb ITimer IIpMacPermDb IManagement IIp are slicing and symmetry exploiting methods. In program slicing, we define slicing criterion which is typically a pair of program location and a set of variables. Then, a program slice is a part of the original

406

Development of an EMF Measurements Database, EMF Rapid Program, Project #5, Interim Report: April 1995-December 1996  

SciTech Connect

The EMF measurement data sets in existence today were compiled with varying goals and techniques. Consequently, they have different information content as well as varying logical and physical structure. Future studies will continue to pursue varying goals and utilize techniques that cannot be known in advance. Primary goals for the EMF Measurements Database developed under the Department of Energy EMF RAPID Program are to develop a database structure that can accommodate the diversity of EMF data sets, provide guidance for production of future EMF data sets, and serve as an accessible repository of EMF measurement data. Specific objectives of the EMF Measurements Database are: o to preserve study descriptions, results and data; o to provide readily accessible, well-documented data; and o to facilitate communication among researchers. In addition, the EMF Measurements Database will encourage additional analysis of existing data sets, facilitate analysis of data from multiple projects, support design of new studies, and permit future issues in EMF exposure assessment to be addressed with existing data. Preservation of study descriptions and data is accomplished with a formal, but open, structure. Specifications have been developed for the various elements of the database. Each data set in the database is formally described by a metadata file. The structured metadata file describes the origin, development, logical and physical structure and distribution mechanism for each data set. The metadata for each data set is generated according to a specification developed for the EMF Measurements Database. The actual measurement data is contained in data Products for each data set. The number and type of data product will vary by data set. Most of the data products in the possession of the EMF Measurements Database are available for download from an Internet site. For some data sets, the data products will be maintained by other parties who may have their own access procedures. In addition, data set contributors or users can provide reports that describe results of the study and analysis of the data with text and figures. Guidelines have been developed for preparation of reports. Access to the EMF Measurements Database is provided via an Internet site (http://www.emf-data. erg). The site provides descriptive information in a home page, . . access to data products with a file transfer protocol (ftp) address, and links to other EMF-related sites.

T. Dan Bracken, Inc.

1997-04-01T23:59:59.000Z

407

Center for Productivity Innovation's Student Project with Industry Program at the University of Tennessee, Department of Industrial and Systems Engineering  

Science Conference Proceedings (OSTI)

A robust graduate engineering education experience requires students to learn the fundamental subject knowledge, to develop their ability to apply what they know to actual projects, and to contribute to the current body of knowledge by writing theses ... Keywords: Student Projects with Industry, engineering education, graduate research and education, industrial engineering, industry-university interaction

Rapinder Sawhney, Sima Maleki, Joseph Wilck, Pedraum Hashemian

2013-01-01T23:59:59.000Z

408

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

409

BWRVIP-266: BWR Vessel and Internals Project, Technical Bases for Revision of the BWRVIP-41 Jet Pump Inspection Program  

Science Conference Proceedings (OSTI)

Revision to reinspection requirements based on the collection and analysis of inspection data is a valid and valuable approach for optimizing inspection programs. The results of this work provide an optimized program that decreases inspection burden while ensuring 1) that locations found to have higher susceptibility to degradation and/or higher safety significance continue to receive appropriate inspection focus and 2) that the level of safety provided by the existing inspection program recommended ...

2012-10-18T23:59:59.000Z

410

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network (OSTI)

Power to Develop a 600 MW Wind Farm in Texas. ” October 29,to- develop-a-600-mw-wind-farm-in-texas Council of EconomicStimulus Funds Sought By Wind Farm Project With Parts Built

Bolinger, Mark

2012-01-01T23:59:59.000Z

411

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network (OSTI)

our dependency on non-renewable energy sources” (U.S.our dependency on non-renewable energy sources” (U.S.renewable energy projects. This value is broken down into three non-

Bolinger, Mark

2012-01-01T23:59:59.000Z

412

American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies  

DOE Green Energy (OSTI)

The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

Russo, Bryan J.

2010-09-30T23:59:59.000Z

413

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3  

SciTech Connect

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

Beck Colleen M.,Edwards Susan R.,King Maureen L.

2011-09-01T23:59:59.000Z

414

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3  

SciTech Connect

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

Beck Colleen M.,Edwards Susan R.,King Maureen L.

2011-09-01T23:59:59.000Z

415

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3  

Science Conference Proceedings (OSTI)

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

Beck Colleen M,Edwards Susan R.,King Maureen L.

2011-09-01T23:59:59.000Z

416

Program  

Office of Scientific and Technical Information (OSTI)

Extremophiles 2004 Extremophiles 2004 5th International Conference on Extremophiles SEPTEMBER 19 -23, 2004 CAMBRIDGE, MARYLAND Extremophiles 2004 5th International Conference on Extremophiles © 2004, American Society for Microbiology 1752 N Street, N.W. Washington, DC 20036-2904 Phone: 202-737-3600 World Wide Web: www.asm.org All Rights Reserved Printed in the United States of America ISBN: 1-55581 324-0 TABLE OF CONTENTS General Information Scientific Program Abstracts for Oral Sessions Abstracts for Poster Sessions Index 4 10 18 42 144 4 ASM Conferences EXECUTIVE COMMITTEE Frank Robb, Chair University of Maryland Biotechnology Institute Michael W. Adams University of Georgia Koki Horikoshi Japan Agency for Marine-Earth Science and Technology Robert M. Kelly North Carolina State University Jennifer Littlechild

417

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

418

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

419

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

420

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

422

Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1  

Science Conference Proceedings (OSTI)

Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

Cartmell, D.B.

1995-09-01T23:59:59.000Z

423

Materials Reliability Program: Background of Reactor Vessel Material Surveillance Programs and Recommended Data Validation Protocol for the Radiation Embrittlement Archive Project (REAP) Database (MRP-369)  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) staff is currently developing an updated, comprehensive reactor vessel surveillance database as a replacement for the Power Reactor Embrittlement Database Version 3 (PR-EDB). The new database—called “Radiation Embrittlement Archive Project,” or REAP—will be available to the public via the Internet. The REAP database contains essential information on the materials and test results from surveillance capsules in U.S. plants; these ...

2013-07-25T23:59:59.000Z

424

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

425

Validation procedures used in the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

The purpose of this report is (1) to document the data validation process developed for the Background Soil Characterization Project (BSCP); (2) to offer members of other project teams and potential data users the benefit of the experience gained in the BSCP in the area of developing project-specific data validation criteria and procedures based on best available guidance and technical information; and (3) to provide input and guidance to the efforts under way within Martin Marietta Energy Systems, Inc., to develop standard operating procedures to streamline and optimize the analytical laboratory data validation process for general use by making it more technically rigorous, consistent, and cost effective. Lessons learned from the BSCP are also provided to meet this end (Sect. 1.3).

1993-12-01T23:59:59.000Z

426

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

427

Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1  

SciTech Connect

This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

NONE

1995-09-01T23:59:59.000Z

428

Nevada, Former Production Workers Screening Projects | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada, Former Production Workers Screening Projects Nevada, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: NNSS and...

429

Searchlight Wind Energy Project FEIS Appendix E  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2, 2009 District Las Vegas Field Office Resource Area Activity (program) Proposed Wind Generation SECTION A. PROJECT INFORMATION 1. Project Name Searchlight Wind Project 4....

430

Hanford, Former Production Workers Screening Projects | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford, Former Production Workers Screening Projects Hanford, Former Production Workers Screening Projects Project Name: National Supplemental Screening Program Covered DOE Site:...

431

Renewable Energy Project Assistance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Assistance Renewable Energy Project Assistance October 7, 2013 - 9:41am Addthis The Federal Energy Management Program (FEMP) provides ongoing renewable energy project...

432

Project Funding | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Funding Project Funding Project Funding Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings. The Federal Energy Management Program (FEMP) supports Federal agencies identify, obtain, and implement project funding for energy projects through: Energy Savings Performance Contracts ESPC ENABLE Process Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs. Federal agencies can choose the funding options that best fits for their project needs. For an overview of available funding options and strategies, read the FEMP Project Funding Quick Guide.

433

Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financial Savings Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Prepared By: Yaw O. Agyeman, TMS, Inc. with Jeff Dowd, DOE Office of Energy Efficiency & Renewable Energy Prepared for the Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy October 2008 Acknowledgments: Special thanks go to the following people who provided inputs to the study or review comments on an earlier draft of this paper. * EERE Hydrogen, Fuel Cells and Infrastructure Technologies Program - JoAnn Milliken, Nancy Garland, Sunita Satyapal, Antonio Ruiz, Roxanne Garland, and John Garbak. * Office of Planning, Budget and Analysis - Darrell Beschen and Randy Steer. * National Renewable Energy Laboratory - Neil Snyder and Bill Babiuch.

434

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

435

BWRVIP-129: BWR Vessel and Internals Project: Post-NMCA Fuel Surveillance Program at the Duane Arnold Energy Center: EOC 17 Fuel Hotcell Examination Program  

Science Conference Proceedings (OSTI)

Duane Arnold was the first plant to implement noble metal chemical application (NMCA), also known as NobleChem™, during hot shutdown near the end of cycle (EOC) 14 in 1996. A fuel surveillance program evaluated fuel rod performance after one, two, and three NMCA cycles via poolside inspections and after one and three cycles via a hot cell postirradiation examination (PIE). This report documents hot cell PIE results of fuel rods after operating for three post-NMCA cycles, during which time there was...

2004-06-23T23:59:59.000Z

436

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

437

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

438

Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995  

DOE Green Energy (OSTI)

The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

NONE

1996-02-01T23:59:59.000Z

439

Modular Pebble-Bed Reactor Project: Laboratory-Directed Research and Development Program FY 2002 Annual Report  

Science Conference Proceedings (OSTI)

This report documents the results of our research in FY-02 on pebble-bed reactor technology under our Laboratory Directed Research and Development (LDRD) project entitled the Modular Pebble-Bed Reactor. The MPBR is an advanced reactor concept that can meet the energy and environmental needs of future generations under DOE’s Generation IV initiative. Our work is focused in three areas: neutronics, core design and fuel cycle; reactor safety and thermal hydraulics; and fuel performance.

Petti, David Andrew; Dolan, Thomas James; Miller, Gregory Kent; Moore, Richard Leroy; Terry, William Knox; Ougouag, Abderrafi Mohammed-El-Ami; Oh, Chang H; Gougar, Hans D

2002-11-01T23:59:59.000Z

440

Supplement Analysis for the Watershed Management Program EIS - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence  

Science Conference Proceedings (OSTI)

The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The proposed fence will meet or exceed BPA's minimum requirement of a 35-foot setback from the stream. Fence posts will be driven into the ground with a post ponder. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing.

N /A

2004-08-04T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Program on Technology Innovation: Projecting Future Fossil- and Biomass-Fueled Power Generation System Configurations: Year 2030  

Science Conference Proceedings (OSTI)

The generation mix in the year 2030 will likely look somewhat different from the present, as growth in generating capacity and regulatory initiatives to reduce emissions lead to changes in the U.S. power generation fleet. Chemical pollutants emitted from this future generation mix are likely to differ from those at present, including changes to the characteristics and amounts of chemicals released to air, wastewater, and solid waste streams. This report presents interim results of a project to predict he...

2009-12-28T23:59:59.000Z

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

445

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

446

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

447

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

448

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

449

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

450

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

451

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

452

Clean Coal Technology Demonstration Program: Program Update 2001  

Science Conference Proceedings (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results. Also includes Power Plant Improvement Initiative Projects.

Assistant Secretary for Fossil Energy

2002-07-30T23:59:59.000Z

453

COURSE READER STUDENT WORK Interaction Design for High-Resolution Displays  

E-Print Network (OSTI)

-COMPUTER INTERACTION GROUP, UNIVERSITY OF KONSTANZ, 2007 Squidy - UI Design for IManager Roman R¨adle - Universit--Squidy, IManager, input device, output device, data filter, interaction design, high resolution displays, knowledge gleichzeitig der erste program- mierbare und turingm¨achtige sowie der erste, der auf dem bin¨aren Zahlensystem

Reiterer, Harald

454

Plutonium Consumption Program, CANDU Reactor Project: Feasibility of BNFP Site as MOX Fuel Supply Facility. Final report  

SciTech Connect

An evaluation was made of the technical feasibility, cost, and schedule for converting the existing unused Barnwell Nuclear Fuel Facility (BNFP) into a Mixed Oxide (MOX) CANDU fuel fabrication plant for disposition of excess weapons plutonium. This MOX fuel would be transported to Ontario where it would generate electricity in the Bruce CANDU reactors. Because CANDU MOX fuel operates at lower thermal load than natural uranium fuel, the MOX program can be licensed by AECB within 4.5 years, and actual Pu disposition in the Bruce reactors can begin in 2001. Ontario Hydro will have to be involved in the entire program. Cost is compared between BNFP and FMEF at Hanford for converting to a CANDU MOX facility.

1995-06-30T23:59:59.000Z

455

JGI Fungal Genomics Program  

E-Print Network (OSTI)

JGI Fungal Genomics Program Igor V. Grigoriev 1 Lawrenceof California. JGI Fungal Genomics Program Contact: IgorJGI). Its key project, the Genomics Encyclopedia of Fungi,

Grigoriev, Igor V.

2012-01-01T23:59:59.000Z

456

UNIVERSITY RESEARCH PROGRAM IN ROBOTICS, Final Technical Annual Report, Project Period: 9/1/04 - 8/31/05  

Science Conference Proceedings (OSTI)

The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.

James S. Tulenko; Carl D. Crane III

2006-02-15T23:59:59.000Z

457

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

DOE Green Energy (OSTI)

Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

Grace, R. C.; Gifford, J.

2010-01-01T23:59:59.000Z

458

Coal air turbine {open_quotes}CAT{close_quotes} program invention 604. Fourth quarter project report, July 1995--September 1995  

SciTech Connect

A coal air turbine `CAT` generates electric power and heat from coal combustion. The purpose of this project is the conceptual design of a `CAT` plant, and to make a comparison of the capital cost and and cost of power and steam from the `CAT` plant with power produced by alternate plants at the same site. Three configurations investigated include: condensing plant utilizing coal fuel and a condenser tower, or river, for cooling; a cogeneration plant utilizing coal and a steam turbine; and a cogeneration plant utilizing steam export and injection with waste coal fuel.

Foster-Pegg, R.W.

1995-10-31T23:59:59.000Z

459

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program  

DOE Green Energy (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1996-11-01T23:59:59.000Z

460

Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994  

DOE Green Energy (OSTI)

The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

Not Available

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

462

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

463

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

464

The Development, Content, Design, and Conduct of the 2011 Piloted US DOE Nuclear Criticality Safety Program Criticality Safety Engineering Training and Education Project  

SciTech Connect

In May 1973 the University of New Mexico conducted the first nationwide criticality safety training and education week-long short course for nuclear criticality safety engineers. Subsequent to that course, the Los Alamos Critical Experiments Facility (LACEF) developed very successful 'hands-on' subcritical and critical training programs for operators, supervisors, and engineering staff. Since the inception of the US Department of Energy (DOE) Nuclear Criticality Technology and Safety Project (NCT&SP) in 1983, the DOE has stimulated contractor facilities and laboratories to collaborate in the furthering of nuclear criticality as a discipline. That effort included the education and training of nuclear criticality safety engineers (NCSEs). In 1985 a textbook was written that established a path toward formalizing education and training for NCSEs. Though the NCT&SP went through a brief hiatus from 1990 to 1992, other DOE-supported programs were evolving to the benefit of NCSE training and education. In 1993 the DOE established a Nuclear Criticality Safety Program (NCSP) and undertook a comprehensive development effort to expand the extant LACEF 'hands-on' course specifically for the education and training of NCSEs. That successful education and training was interrupted in 2006 for the closing of the LACEF and the accompanying movement of materials and critical experiment machines to the Nevada Test Site. Prior to that closing, the Lawrence Livermore National Laboratory (LLNL) was commissioned by the US DOE NCSP to establish an independent hands-on NCSE subcritical education and training course. The course provided an interim transition for the establishment of a reinvigorated and expanded two-week NCSE education and training program in 2011. The 2011 piloted two-week course was coordinated by the Oak Ridge National Laboratory (ORNL) and jointly conducted by the Los Alamos National Laboratory (LANL) classroom education and facility training, the Sandia National Laboratory (SNL) hands-on criticality experiments training, and the US DOE National Criticality Experiment Research Center (NCERC) hands-on criticality experiments training that is jointly supported by LLNL and LANL and located at the Nevada National Security Site (NNSS) This paper provides the description of the bases, content, and conduct of the piloted, and future US DOE NCSP Criticality Safety Engineer Training and Education Project.

Hopper, Calvin Mitchell [ORNL

2011-01-01T23:59:59.000Z