Appendix 8 - iManage Change Management Standards  

Broader source: Energy.gov (indexed) [DOE]

Appendix 8 iManage Change Management Standards Department of Energy Deliverable ID: PM1001 Version number: 1.0 Draft/Final as of: 7/23/2012 Printed on: 27 Jul 2012 Author: Michael Preis Michael.Preis@hq.doe.gov (301)903-3812 Owner: Lajos Grof-Tisza, iManage Program Manager Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Configuration Management Plan Program Mgr: Lajos Grof-Tisza Doc ID: PM1001 Draft ii Document information Document source This document is maintained as an online document. Contact the author for the latest version. Revision history Version number Date Summary of changes Revised By 1.00 26 Feb 2007 Initial Version Michael Preis Approvals

2

Appendix 8 - iManage Change Management Standards  

Broader source: Energy.gov (indexed) [DOE]

not impact integration between iManage systems. These changes are managed by the specific project change control procedures. If there is uncertainty that a proposed change affects...

3

Appendix 9 - iManage Interfaces  

Broader source: Energy.gov (indexed) [DOE]

8 - iManage Interfaces 8 - iManage Interfaces STARS, STRIPES, IDW/iPortal utilize a number of internal and external interfaces to interconnect and share information within iManage, and other systems, both DOE and non-DOE. The PWS is not limited to the interfaces listed below as other interfaces may be required to be developed and/or supported during the performance of this contract. The current interfaces are described below. STARS The STARS interface programs utilize standard API's and Interface tables built into the Oracle Applications E-Business software suite. Standard Concurrent Requests within the financial system are configured to process the interface records once they are loaded into the interface tables. Successful interface records that process through the interface API's are inserted and

4

Appendix 2 - IManageRoadmap  

Broader source: Energy.gov (indexed) [DOE]

the iManage Roadmap the iManage Roadmap Stakeholder Discussions 7/27/2012 - Draft 1 Stakeholder Discussions July 2012 1. Align DOE's strategic plan, and CF/MA/HC objectives, with iManage initiatives. 2. Use business goals to drive urgency and help explain the value proposition of what we are planning on the roadmap. 3. Create a framework to coordinate planning across iManage Roadmap goals 3. Create a framework to coordinate planning across multiple iManage systems and customer groups. 4. Capture cross-functional implications of the plan, such as dependencies on other systems and initiatives (a truly iManage view). 5. Determine reuse opportunities across domains. 6. Reflect consensus among all iManage stakeholders 7/27/2012 - Draft 2 1. Expand Business Process Improvement Services (DOE Strategic Plan 2011--

5

MEMORANDUM FOR THE CHAIRPERSONS, I-MANAGE EXECUTIVE STEERING COMMITTEE  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy . / Washington. DC 20585 Janvary 11, 2005 MEMORANDUM FOR THE CHAIRPERSONS, I-MANAGE EXECUTIVE STEERING COMMITTEE FROM: William S. Maharay Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on the "I-MANAGE STARS Implementation," Audit Report No.: OAS-L-05-02 The purpose of this report is to provide you with the results of our audit of the Department of Energy's (Department) implementation of the Integrated Management Navigation System (I- MANAGE) program's Standard Accounting and Reporting System (STARS). The report follows up on the challenges to successful implementation of STARS we highlighted in our interim report on "The Department's Implementation of I-MANAGE STARS" (Audit Report

6

PIA - I-Manage STARS | Department of Energy  

Energy Savers [EERE]

STARS PIA - I-Manage STARS PIA - I-Manage STARS More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change...

7

Appendix 1 -Additional iManage Systems  

Broader source: Energy.gov (indexed) [DOE]

- Additional iManage/Corporate Information Systems - Additional iManage/Corporate Information Systems In addition to STARS, STRIPES, IDW/iPortal, these are corporate systems maintained by the Office of Corporate Information Systems. These systems are currently not included as part of the requirements. Application/Project Automated Time and Attendance (ATAAPS) Budget and Reporting Code System (BARC) Budget Table System (BTS) Consent Order Tracking System (COTS) Consolidated Accounting and Investment System (CAIS) Departmental Audit Report Tracking System (DARTS) - Enhancements Departmental Audit Report Tracking System (DARTS) - Existing Departmental Inventory Management System (DIMS) DOEInfo eMailList ePerformance eRooms (Pensions) External CFO Website Folio (Portfolio Management) Funds Distribution System (FDS)

8

Appendix 3 - iManage Help Desk Priority Level  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Appendix 3- iManage Help Desk Priority Levels Priority Level Definitions Resolution Time Critical Prevents normal operational business and for which there is no known workaround. Examples: inability to produce financial statements by required deadline, the inability to pay contractors in accordance with the Prompt Pay Act, the inability to commit or obligation funds, or Total loss of production service to entire customer set, or Impacts one or more service level commitments, or Impacts the delivery schedule Note 1: Reassignment must be communicated and directly agreed upon. Note 2: The initial response time for critical priority tickets must be within 60 minutes. Resolution is around the clock support until service is restored. Closure is

9

iManage Q&As Industry Day Aug 16 2012  

Broader source: Energy.gov (indexed) [DOE]

iManage Industry Day, Q & A iManage Industry Day, Q & A Office of the Chief Financial Officer Office of Corporate Information Systems iManage.om.procurement@hq.doe.gov DE-SOL-0004498 Page 1 of 5 Listed below are the questions submitted by vendors attending the August 16, 2012 iManage Industry Day. All questions were submitted on 3 x 5 index cards and answered at the end of the Industry Day session. All questions and the answers will be posted to FedBizOpps and FedConnect by August 31, 2012. 1. Where is the bright red line between current iManage2.0 contract and this new contract effort? Key distinction of what is a new effort versus and existing effort? The iManage 2.0 and the O&M contract are comprised of contractors working closely together with Federal staff to achieve consensus on resolutions as an integrated team.

10

START Program Project Sites  

Broader source: Energy.gov [DOE]

The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START,...

11

Weatherization & Intergovernmental Program: Projects  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Washington Wisconsin West Virginia Wyoming Program: Energy Efficiency and Conservation Block Grants Submit Contacts | Web Site Policies | U.S. Department of Energy | USA.gov...

12

Combined Welcome and iManage OM Industry Day PP Presentation August 16 2012  

Broader source: Energy.gov (indexed) [DOE]

Data Data iManage Industry Day 2 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data Welcome Presentation Monica Serrano United States Dept of Energy (DOE) HQ Office of Procurement 3 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data All information provided at Industry Day and discussed at the One-on-One sessions is preliminary and subject to change based on the final Acquisition Strategy and Solicitation 4 iportal.doe.gov Connecting Our People, Simplifying Our Work, Liberating Our Data Presentation materials will be distributed hard-copy and will be posted to: DOE Website https://cms.doe.gov/management/office- management/operational- management/procurement-and-acquisition/major-

13

MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT  

E-Print Network [OSTI]

validation procedures in the commercial marine license reporting program (MRIP For-Hire Project) by Hongguang1 MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT Hawaii for-hire pilot study to incorporate

14

Appendix 7 - Stripes Architecture Overview  

Broader source: Energy.gov (indexed) [DOE]

Name: Department of Energy iManage Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page i 8/30/2012 U.S. Department of Energy Office of the Chief Financial Officer iManage Strategic Integrated Procurement Enterprise System STRIPES Technical Architecture Overview Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page ii 8/30/2012 Title Page Document Name: Strategic Integrated Procurement Enterprise System (STRIPES) Technical Architecture Overview

15

US LHC Accelerator Project and Research Program  

E-Print Network [OSTI]

US LHC Accelerator Project and Research Program Jim Strait Fermilab 13 June 2002 brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT #12;13 June 2002 J. Strait - US LHC Accelerator Project 2 Outline US LHC Accelerator (Construction) Project Project Technical and Schedule Status Cost and Schedule

Large Hadron Collider Program

16

2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I:...

17

Federal Energy Management Program: Project Funding  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Funding Project Funding AFFECT FOA Webinar FEMP hosted a 60-minute informational webinar and question and answer session on the AFFECT FOA on November 12, 2013. Review the webinar slides and transcript. Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings. The Federal Energy Management Program (FEMP) supports Federal agencies identify, obtain, and implement project funding for energy projects through: Energy Savings Performance Contracts ESPC ENABLE Process Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs. Federal agencies can choose the funding options that best fits for their project needs. For an overview of available funding options and strategies, read the FEMP Project Funding Quick Guide.

18

Program Managers/Project Leaders, Applied Energy Programs, LANL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Duncan McBranch (Acting) Duncan McBranch (Acting) 505-667-8597 Office Administrator Becky Fernandez 505-667-3621 Program Manager Karl Jonietz 505-663-5539 Program Manager Melissa Fox 505-663-5538 Budget Analyst Minhua Li 505-667-3568 Listed By Area Biofuels,TBD Carbon Dioxide Separation & Capture, Kathryn Berchtold, Science Project Leader, 505-665-7841, berchtold@lanl.gov Carbon Sequestration, Rajesh Pawar, Science Project Leader, 505-665-6929, rajesh@lanl.gov Energy Storage, Albert Migliori, Science Project Leader, 505-667-2515, migliori@lanl.gov Fuel Cells, Rod Borup, Program Manager, 505-667-2823, borup@lanl.gov Fossil Fuels, Melissa Fox, Program Manager, 505-665-5377, mami@lanl.gov Geothermal Energy , Kenneth Rehfeldt, Science Project Leader, 505-667-3644, krehfeld@lanl.gov Hydrogen Storage & Production, Kevin Ott, Program Manager, 505-667-4600, kcott@lanl.gov

19

National Ignition Facility Project Site Safety Program  

SciTech Connect (OSTI)

This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES&H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES&H requirements are consistent with the ''LLNL ES&H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B.

Dun, C

2003-09-30T23:59:59.000Z

20

Synchrophasor Engineering Education Program Project Summaries Available  

Broader source: Energy.gov [DOE]

On March 6, 2014, the Academic-Industry Collaboration (AIC) - Synchrophasor Engineering Education Program hosted an information exchange webinar that included presentation from each of seven projects that received awards totalling approximately $1.4 million to help colleges and universities better prepare the electricity industry workforce of the future. The agenda and project summaries from the information exchange are available to download.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Advanced Research Projects Agency - Energy Program Specific Recovery...  

Office of Environmental Management (EM)

Advanced Research Projects Agency - Energy Program Specific Recovery Plan Advanced Research Projects Agency - Energy Program Specific Recovery Plan Microsoft Word - 44F1801D.doc...

22

2014 Annual Merit Review Results Report - Project and Program...  

Energy Savers [EERE]

Project and Program Statistical Calculations Overview 2014 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle...

23

Uniform Methods Project for Determining Energy Efficiency Program...  

Energy Savers [EERE]

for Determining Energy Efficiency Program Savings Uniform Methods Project for Determining Energy Efficiency Program Savings Under the Uniform Methods Project, DOE is developing a...

24

START Program for Renewable Energy Project Development Assistance...  

Broader source: Energy.gov (indexed) [DOE]

Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance The Strategic Technical Assistance Response Team...

25

Awareness Program Fuels Energy Savings Projects  

E-Print Network [OSTI]

AWARENESS PROGRAM FUELS ENERGY SAVINGS PROJECTS ALEKS M. KLIDZEJS Senior Mechanical Engineer 3M Company Saint Paul, Minnesota ABSTRACT Energy awareness concepts were incorporated as part of a plant energy survey and played a major part... in the followup program. Plant manager support was received and multi-disciplinary task group was established to review and recommend energy saving potentials. Beyond instilling traditional benefits of an awareness program, capital expenditure energy savings...

Klidzejs, A. M.

26

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT MANAGEMENT & ADMINISTRATION - STRIPES * Template - January 30,2009, Version 2 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. Module I - Privacy Needs Assessment Date Departmental Element & Site Name of Information System or IT Project Exhibit Project UIO April 21, 2009 Office of the Chief Financial Officer, Office of Corporate Information Systems, CF-40 Germantown, U.S. Department of Energy, DOE Headquarters, Germantown, hosted in the OCIO's Application Hosting Environment (AHE) in the CA-007 server

27

Federal Energy Management Program: Renewable Energy Project Assistance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Renewable Energy Renewable Energy Project Assistance to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Assistance on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Assistance on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Assistance on Google Bookmark Federal Energy Management Program: Renewable Energy Project Assistance on Delicious Rank Federal Energy Management Program: Renewable Energy Project Assistance on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Assistance on AddThis.com... Energy-Efficient Products Technology Deployment Renewable Energy Federal Requirements Renewable Resources & Technologies Project Planning & Implementation

28

Colorado Natural Heritage Program 2003 Project Abstracts  

E-Print Network [OSTI]

Colorado Natural Heritage Program 2003 Project Abstracts #12;Cover photo: A CNHP researcher collects freshwater specimens (Pisidium spp.) at Long Slough Reservoir on the Grand Mesa of Colorado's West of Colorado's biodiversity, what efforts are underway to maintain it, and why more biological information

29

Aviation Safety Program Aircraft Aging & Durability Project  

E-Print Network [OSTI]

to Other Projects and Programs 8 2. Milestones & Metrics 10 2.1 10-Year Roadmap 10 2.2 Five Year Milestone for Characterization and Validation (1.5) 32 3.2 Level 2 ­ Discipline Level Capabilities 34 3.2.1 NDE / SHM Systems (2 Roadmap. 11 Figure 5. Representative development of capabilities for Detect Theme. 12 Figure 6

30

Program assists steam drive design project  

SciTech Connect (OSTI)

A new program for the HP-41CV programmable calculator will compute all parameters required for a steam drive project design. The Marx and Langenheim model assumptions are used to solve a more advanced version of the Myhill and Stegemeier model. Also, the Mandl and Volek model assuptions are used to compute the size of the steam zone.

Mendez, A.A.

1984-08-27T23:59:59.000Z

31

Federal Energy Management Program: Renewable Energy Project Planning and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

32

Technical Standards, Program Project Justification Statement - August 29,  

Broader source: Energy.gov (indexed) [DOE]

Program Project Justification Statement - Program Project Justification Statement - August 29, 2012 Technical Standards, Program Project Justification Statement - August 29, 2012 August 29, 2012 DOE Technical Standards Program Project Justification Statement As part of the new justification process for developing or revising DOE Technical Standards, organizations, people are asked to provide the listed information (in numeric format) in a Project Justification Statement (PJS) prior to submitting the requisite Project Registration and Approval Request form (F 1300.5). Technical Standards, Program Project Justification Statement More Documents & Publications DOE-TSPP-2-2013, Initiating DOE Technical Standards Active Project Justification Statement DOE-TSPP-7-2013, Maintaining DOE Technical Standards

33

Federal Energy Management Program: Technical and Project Assistance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technical and Technical and Project Assistance to someone by E-mail Share Federal Energy Management Program: Technical and Project Assistance on Facebook Tweet about Federal Energy Management Program: Technical and Project Assistance on Twitter Bookmark Federal Energy Management Program: Technical and Project Assistance on Google Bookmark Federal Energy Management Program: Technical and Project Assistance on Delicious Rank Federal Energy Management Program: Technical and Project Assistance on Digg Find More places to share Federal Energy Management Program: Technical and Project Assistance on AddThis.com... Project Assistance Call for Projects Training Outreach Technical and Project Assistance The Federal Energy Management Program's (FEMP) offers technical and project assistance to help Federal agencies successfully implement energy- and

34

Federal Energy Management Program: Recovery Act Project Stories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Stories to someone by E-mail Project Stories to someone by E-mail Share Federal Energy Management Program: Recovery Act Project Stories on Facebook Tweet about Federal Energy Management Program: Recovery Act Project Stories on Twitter Bookmark Federal Energy Management Program: Recovery Act Project Stories on Google Bookmark Federal Energy Management Program: Recovery Act Project Stories on Delicious Rank Federal Energy Management Program: Recovery Act Project Stories on Digg Find More places to share Federal Energy Management Program: Recovery Act Project Stories on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs Recovery Act Technical Assistance Projects Project Stories Recovery Act Project Stories

35

ORAU Science Education Program (SEP) Global Change Education Program (GCEP)  

Broader source: Energy.gov (indexed) [DOE]

ORAU Science Education Program (SEP) Global Change Education ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources ORAU Science Education Program (SEP) Global Change Education Program (GCEP) PIA, Office of Information Resources More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management MOX Services Unclassified Information System PIA, National Nuclear Services Administration E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory

36

Federal Energy Management Program: Diversifying Project Portfolios for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Diversifying Diversifying Project Portfolios for Utility Energy Service Contracts to someone by E-mail Share Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Facebook Tweet about Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Twitter Bookmark Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Google Bookmark Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Delicious Rank Federal Energy Management Program: Diversifying Project Portfolios for Utility Energy Service Contracts on Digg Find More places to share Federal Energy Management Program:

37

Safeguards and Security for Program and Project Management -...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3A, Safeguards and Security for Program and Project Management by Ruben Sanchez Functional areas: Program Management, Property Management, Safety and Security The Guide provides a...

38

DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting Presentation by DOE's Patrick Davis at a meeting on new fuel...

39

QA program plan plutonium stabilization and handling project W-460  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

SCHULTZ, J.W.

1999-09-02T23:59:59.000Z

40

Clean Coal Technology Programs: Completed Projects (Volume 2)  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2003-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Federal Energy Management Program: Large-scale Renewable Energy Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large-scale Large-scale Renewable Energy Projects (Larger than 10 MWs) to someone by E-mail Share Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Facebook Tweet about Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Twitter Bookmark Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Google Bookmark Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Delicious Rank Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on Digg Find More places to share Federal Energy Management Program: Large-scale Renewable Energy Projects (Larger than 10 MWs) on

42

Federal Energy Management Program: FDA Construction Project Serves as a  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FDA Construction FDA Construction Project Serves as a Super ESPC Model to someone by E-mail Share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Facebook Tweet about Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Twitter Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Google Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Delicious Rank Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Digg Find More places to share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on AddThis.com... Energy Savings Performance Contracts

43

Delaware Greenhouse Gas Reduction Projects Grant Program (Delaware) |  

Broader source: Energy.gov (indexed) [DOE]

Greenhouse Gas Reduction Projects Grant Program (Delaware) Greenhouse Gas Reduction Projects Grant Program (Delaware) Delaware Greenhouse Gas Reduction Projects Grant Program (Delaware) < Back Eligibility Agricultural Commercial Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Wind Program Info Funding Source Greenhouse Gas Reduction Projects Fund State Delaware Program Type Grant Program Provider Delaware Department of Natural Resources and Environmental Control The Delaware Greenhouse Gas Reduction Projects Grant Program is funded by the Greenhouse Gas Reduction Projects Fund, established by the Act to Amend Title 7 of the Delaware Code Relating to a Regional Greenhouse Gas

44

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect (OSTI)

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

45

START Program for Renewable Energy Project Development Assistance |  

Broader source: Energy.gov (indexed) [DOE]

Program for Renewable Energy Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through the START Program for Renewable Energy Project Development Assistance, a team of DOE and national laboratory experts will work directly with tribal communities to evaluate project financial and technical feasibility, provide on-going training to community members, and help implement a variety of clean energy projects, including energy storage infrastructure, renewable energy deployment, and energy efficiency. The following projects were selected for the 2013 START Renewable Energy

46

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

The California Energy Commission's Geothermal Resources Development Account Geothermal Planning Projects support of geothermal resource elements, or geothermal components of energy elements, for inclusion in the localPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT STRUCTURING A DIRECT

47

SuperTruck Program: Engine Project Review  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

48

Microsoft Word - OMB_300_CF iManage _Rev 11_ 9-17-2009.doc  

Broader source: Energy.gov (indexed) [DOE]

Exhibit 300: Capital Asset Plan and Business Case Summary Exhibit 300: Capital Asset Plan and Business Case Summary Part I: Summary Information And Justification (All Capital Assets) Section A: Overview (All Capital Assets) 1. Date of Submission: 2. Agency: 3. Bureau: 4. Name of this Investment: 5. Unique Project (Investment) Identifier: (For IT investment only, see section 53.9. For all other, use agency ID system.) 6. What kind of investment will this be in FY 2011? (Please NOTE: Investments moving to O&M in FY 2011, with Planning/Acquisition activities prior to FY 2011 should not select O&M. These investments should indicate their current status.) 7. What was the first budget year this investment was submitted to OMB? 8. Provide a brief summary and justification for this investment, including a brief description of how this closes in part or in

49

Advanced Seismic Data Analysis Program- The "Hot Pot" Project  

Broader source: Energy.gov [DOE]

Advanced Seismic Data Analysis Program- The "Hot Pot" Project presentation at the April 2013 peer review meeting held in Denver, Colorado.

50

Uniform Methods Project for Determining Energy Efficiency Program Savings  

Broader source: Energy.gov [DOE]

Under the Uniform Methods Project, DOE is developing a set of protocols for determining savings from energy efficiency measures and programs. The protocols provide a straightforward method for...

51

Rural Enterprise Assistance Project's Loan Program (Nebraska) | Department  

Broader source: Energy.gov (indexed) [DOE]

Enterprise Assistance Project's Loan Program (Nebraska) Enterprise Assistance Project&#039;s Loan Program (Nebraska) Rural Enterprise Assistance Project's Loan Program (Nebraska) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Loan Program Provider Center for Rural Affairs The Rural Enterprise Assistance Project (REAP) offers four services: financing (micro loans), business training, technical assistance, and networking. REAP's Loan Program focuses on providing capital for rural start-up and existing businesses. Among the loan program are the Direct Loan product, offering loans up to $50,000, and the Rapid Loan product, offering loans up to $10,000, and the Quick GROW Loan, offering loans

52

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT INTEGRATED GEOTHERMAL and the surface generation facilities in geothermal energy production. Please cite the report as follows, California Energy Commission, Geothermal Resources Development Account Program, CEC5002012006 #12;ii Table

53

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Geothermal Fluids. California Energy Commission, PIER Renewables Research Technologies Program. CEC5002009 Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT PILOTSCALE GEOTHERMAL SILICA RECOVERY AT MAMMOTH LAKES MAY 2009 CEC5002009077 Prepared for: California

54

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, National Energy Technology Laboratory, the Western Regional Biomass Energy Program, and Yolo CountyPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT ACCELERATED ANAEROBIC COMPOSTING FOR ENERGY GENERATION AT YOLO COUNTY CENTRAL LANDFILL MAY 2012 CEC5002012063 Prepared for

55

AEP Ohio - Commercial Custom Project Rebate Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Commercial Custom Project Rebate Program - Commercial Custom Project Rebate Program AEP Ohio - Commercial Custom Project Rebate Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Tribal Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate 50% of cost up to $300,000/project $600,000/year Sliding scale incentive reduction when calculated incentive exceeds $160,000/project. Program Info State Ohio Program Type Utility Rebate Program Rebate Amount 0.08/kWh (for one year energy savings) plus 100/kW AEP's demand reduction (at summer peak) Provider AEP Ohio AEP Ohio offers commercial customers incentives to upgrade inefficient

56

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network [OSTI]

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

57

Programming Project : Admittance Matrix and Power/Load-Flow  

E-Print Network [OSTI]

Programming Project : Admittance Matrix and Power/Load-Flow EE 581 April 19, 2012 1 Introduction This project will be to develop your own power-flow (also known as load-flow) solver to study balanced, three-phase power systems in sinusoidal steady-state. The program will read in data from three files (bus, line

Wedeward, Kevin

58

High Productivity Computing Systems Program The ASC-Alliance projects  

E-Print Network [OSTI]

High Productivity Computing Systems Program The ASC-Alliance projects: A case study of large as the ASC-Alliance centers. We conducted interviews with project leads from all five of the centers to gain such codes1 . These projects make up a group of research centers known as the ASC-Alliance centers. Each

Basili, Victor R.

59

Renewable Energy Project Bond Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Bond Program Project Bond Program Renewable Energy Project Bond Program < Back Eligibility Commercial Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Idaho Program Type State Bond Program Provider Idaho Energy Resources Authority Legislation enacted in Idaho in April 2005 ([http://legislature.idaho.gov/legislation/2005/S1192.html Senate Bill 1192]) allows independent (non-utility) developers of renewable energy projects in the state to request financing from the Idaho Energy Resources Authority, a state bonding authority created in March 2005 by the Environment, Energy and Technology Energy Resources Authority Act (House Bill 106). The authority was created to finance the construction of

60

Federal Energy Management Program: ESPC ENABLE Project Assistance and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Assistance and Training Project Assistance and Training ESPC ENABLE Training To learn how to use ESPC ENABLE, take the Streamlining ESPCs for Small Sites First Thursday Seminar on demand. The Federal Energy Management Program (FEMP) offers project assistance and training to help Federal agencies implement Energy Savings Performance Contracts (ESPC) ENABLE projects. Project Assistance Through FY2014, project assistance from FEMP is cost-free and may include project management as well as technical support from experienced project facilitators and procurement staff. General Services Administration (GSA) contracting staff are also available to answer questions regarding the GSA Federal Supply Schedule 84, SIN 246-53. To learn more about one-on-one project assistance for your ESPC ENABLE project, contact Evan Fuka at 202-406-4107.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Geothermal Reservoir Technology Research Program: Abstracts of selected research projects  

SciTech Connect (OSTI)

Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

Reed, M.J. (ed.)

1993-03-01T23:59:59.000Z

62

Current projects - Nuclear Data Program, Nuclear Engineering Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Projects Current Projects Nuclear Data Program Overview Current Projects & Recent Activities Collaborating Organizations Publications Nuclear Data Measurements (NDM) Reports Experimental Nuclear Data Resources Contact ND Program Related Resources Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Data Program Current Projects Bookmark and Share Compilation and evaluation of nuclear structure and decay data for the IAEA coordinated International Nuclear Structure and Decay Data Network. Argonne Nuclear Data Program has the responsibility for evaluations of A=176-179 & 199-209 mass chains. These evaluations are included in the world most completed and comprehensive nuclear structure

63

Procedures for Initiating an International Project or Program Please submit a brief summary of your proposed project or program, addressing the questions below,  

E-Print Network [OSTI]

Procedures for Initiating an International Project or Program Please submit a brief summary of your proposed project or program, addressing non-U.S. countries do you expect to involve in your project? 2. How long

Simaan, Nabil

64

Program & Project Management For The Acquisition Of Capital Assets  

Broader source: Energy.gov (indexed) [DOE]

2009 2009 Office of Management Office of Engineering and Construction Management Operational Organization Chart (FY 09) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Peter O'Konski Director for Facilities Management & Professional Development

65

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Broader source: Energy.gov (indexed) [DOE]

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

66

Uniform Methods Project for Determining Energy Efficiency Program Savings  

Broader source: Energy.gov [DOE]

Under the Uniform Methods Project, DOE is developing a framework and a set of protocols for determining the energy savings from specific energy efficiency measures and programs. The protocols...

67

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

a transport membrane condenser for recovering both energy and water from the lowgrade waste heat streams Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT ENERGY: California Energy Commission Prepared by: Gas Technology Institute #12; Prepared by: Primary Author

68

Safeguards and Security for Program and Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides approaches for implementing security provisions within the functional areas contained in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets. Canceled by DOE G 413.3-3A.

2007-11-15T23:59:59.000Z

69

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

supports public interest energy research and development that will help improve the quality of life Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT ENERGY Prepared for: California Energy Commission Prepared by: San Diego State Research Foundation #12

70

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

& SAVING ENERGY: FINAL REPORT ON INDOOR ENVIRONMENTAL QUALITY & ENERGY MONITORING IN SIXTEENPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT IMPROVING VENTILATION RELOCATABLE CLASSROOMS MAY 2012 CEC5002012075 Prepared for: California Energy Commission Prepared by

71

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

LIGHTING CALIFORNIA'S FUTURE: MARKET CONNECTIONS Prepared for: California Energy Commission Research · Energy Systems Integration Lighting California's Future: Market Connections is one of nine Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

72

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT Renewable Resource/Transmission Development Scenarios Prepared for: California Energy Commission Prepared by: Center for Energy Efficiency.D. David Olsen Center for Energy Efficiency and Renewable Technologies Sacramento, California 95814

73

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT CREATING INCENTIVES FOR ELECTRICITY PROVIDERS TO INTEGRATE DISTRIBUTED ENERGY RESOURCES NOVEMBER 2007 CEC5002008028 Prepared for: California Energy Commission Prepared by: Electric Power Research Institute (EPRI) #12; Prepared by

74

The Periklean Building Program as Public Works Project  

E-Print Network [OSTI]

This published abstract of a talk given at the AIA annual meetings in 1993 focuses on the Periklean building program as a set of construction projects that provided employment for the large numbers of metics (resident ...

Younger, John G.

1993-01-01T23:59:59.000Z

75

DOE Hydrogen Program New Fuel Cell Projects  

E-Print Network [OSTI]

Development Building Weatherization & Intergovernmental Geothermal Hydrogen Wind & Hydropower #12;Integrated Production EERE is working to provide a prosperous future where energy is clean, abundant, reliable Davis - Safety, Codes/Standards Antonio Ruiz - Safety Engineer Hydrogen Technologies Program Patrick

76

Colorado State Capitol Building Geothermal Program Geothermal Project |  

Open Energy Info (EERE)

State Capitol Building Geothermal Program Geothermal Project State Capitol Building Geothermal Program Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Colorado State Capitol Building Geothermal Program Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description This building is approximately 100 years old, and much of the building is heated with expensive district steam and lacks sufficient central cooling. The requested funding pertains to Topic Area 1 Technology Demonstration Projects. Funding would be used for Phase I - Feasibility Study and Engineering Design, Phase II - Installation and Commissioning of Equipment, and Phase III - Operation, Data Collection, and Marketing. Geothermal energy provided by an open-loop ground source heat pump system and upgrades to the building HVAC systems will reduce consumption of electricity and utility steam created with natural gas. Additionally, comfort, operations and maintenance, and air quality will be improved as a result. It is anticipated that the open loop GHP system will require a 500-650 gpm water flow rate.

77

DOE passive solar commercial buildings program: project summaries  

SciTech Connect (OSTI)

The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

Not Available

1982-01-01T23:59:59.000Z

78

Progress Report EISG program Project #99-01-37  

E-Print Network [OSTI]

analysis and modeling of greenhouse energetics and temperature trajectories will shed light-1- 2nd Progress Report on EISG program Project #99-01-37 Modeling Greenhouse Temperature stage (01/01/00~03/31/00) of the EISG Project #99-01-37: Modeling Greenhouse Temperature for Energy

Lieth, J. Heinrich

79

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT GEOTHERMAL EXPLORATION of a significant financial contribution to the project, at no cost to the Califor nia Energy Commission cation of ASTER scenes, at no cost to the Commission. Mark Coolbaugh (Great Basin Center for Geothermal

80

West Valley Demonstration Project Transportation Emergency Management Program  

Broader source: Energy.gov (indexed) [DOE]

West West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 7 Hazards Survey and Hazards Assessment .................................... 7 Program Plans and Procedures ..................................................... 8 Emergency Responder Performance .......................................... 10 Feedback and Continuous Improvement....................................

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Sponsors: California Energy Commission Advanced Power and Energy Program  

E-Print Network [OSTI]

Project Sponsors: California Energy Commission Advanced Power and Energy Program ADVANCED POWER by the California Energy Commission (CEC) in its 2012 solicitation After the intersections were scored, Voronoi & ENERGY PROGRAM www.apep.uci.edu RESULTS For each of the specified 68 station locations, nearby major

Mease, Kenneth D.

82

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

alternative energy educational program, Project SAW: Solar -Solar Energy Research Commission are interested in the program. Projectsolar energy. Award: Pro ect Term: ect Descr 14 months (Project

Case, C.W.

2011-01-01T23:59:59.000Z

83

Program & Project Management For The Acquisition Of Capital Assets  

Broader source: Energy.gov (indexed) [DOE]

February 3, 2011 February 3, 2011 Operational Organization Chart (FY 11) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst (on detail) Rosalyn Matthews - Program Support Specialist EIR Program Analyst (IBM) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Paul Bosco Director Real Estate Tom Geronikos - Realty Spec Mark Price - Realty Spec David Steinau - Realty Spec Project Management James Fountain - Prog Analyst John Makepeace - Prog Analyst Cynthia Seiter - Prog Analyst Project Mgt Assessment Mike Peek - Gen Engr Tom Bruder- Gen Engr Brian Huizenga - Gen Engr Rick Elliott -- Gen Engr

84

Recommendations for improvements to program and project management  

SciTech Connect (OSTI)

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

85

Site Programs & Cooperative Agreements: West Valley Demonstration Project |  

Broader source: Energy.gov (indexed) [DOE]

West Valley Demonstration West Valley Demonstration Project Site Programs & Cooperative Agreements: West Valley Demonstration Project West Valley Demonstration Project The Seneca Nation of Indians has interests and concerns regarding the West Valley Demonstration Project Site. Like at Hanford, DOE environmental cleanup activities have the potential to impact natural and cultural resources and to interfere with American Indian religious practices. Through a cooperative agreement, tribal staff is engaged on a frequent basis with DOE and its contractors. The principle activities engaged by tribes include reviewing and commenting on plans and documents, participating in meetings at the request of DOE, monitoring cultural resource sites, participating in site surveys, and identifying issues that

86

Salt River Project electric vehicle program  

SciTech Connect (OSTI)

Electric vehicles (EV) promise to be a driving force in the future of America. The quest for cleaner air and efforts to trim the nation's appetite for foreign oil are among the reasons why. America's EV future is rapidly approaching, with major automakers targeting EV mass production and sales before the end of the decade. This article describes the Salt River Project (SRP), a leader among electric utilities involved in EV research and development (R and D). R and D efforts are underway to plan and prepare for a significant number of EVs in SRP's service territory and to understand the associated recharging requirements for EVs.

Morrow, K.P.

1994-11-01T23:59:59.000Z

87

The Yucca Mountain Project repository sealing program  

SciTech Connect (OSTI)

Yucca Mountain is being characterized for the development of a high-level nuclear waste repository. The repository is planned to be located in the unsaturated zone in fractured, welded tuff. Sealing of the repository is one element of the Yucca Mountain Project. This paper presents a description of the current sealing design options, design requirements, and the design constraints. Design options for the shafts include anchor-to-bedrock seals, shaft fill, and settlement plugs; in the underground facility, they include drift seals, drainage channels, sumps, and bulkheads. Design requirements are those quantitative requirements imposed on the sealing design options to achieve a desired level of performance. For example, a design requirement could be a restriction on the hydraulic conductivity of a design option. Constraints are restrictions placed on the repository design by the sealing design. An example of a constraint could be establishing the drainage pattern to direct flow from emplacement drifts to nonemplacement drifts. As (1) additional hydrogeologic data are obtained through site characterization, (2) approaches to allocating performance to various subsystems within the Yucca Mountain Project are refined, and (3) the exploratory shafts and the associated testing results are developed, the design requirements and constraints may be modified and used in developing the License Application Design.

Fernandez, J.A.; Hinkebein, T.E

1989-12-01T23:59:59.000Z

88

Federal Energy Management Program: Technical and Project Assistance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technical and Project Assistance Technical and Project Assistance The Federal Energy Management Program's (FEMP) offers technical and project assistance to help Federal agencies successfully implement energy- and water-efficiency projects. Call for Projects: Look up current FEMP project opportunities. Working with DOE National Laboratories: Learn about working with the U.S. Department of Energy's (DOE) national laboratories through FEMP technical services and work-for-others agreements. Sell Energy-Efficient Products: Read about resources available to vendors interested in doing business with the Federal Government. GSA Schedules: Look up more commercial products and services at volume discount pricing arranged by the U.S. General Services Administration (GSA). For more information about FEMP, see:

89

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

90

NEPA COMPLIANCE SURVEY Project Information Project TitJe: Geothermal Technologies Program  

Broader source: Energy.gov (indexed) [DOE]

Project Information Project TitJe: Geothermal Technologies Program Date: 12-11-()9 DOE Code: 6730.020.61041 Contractor Code: Project Lead: Project Overview This NEPA is for the laying of a 2,975 foot, 8" welded plastic water line from Little Teapot Creek near in the 1. What are the environmental impacts? intersection with Teapot Creek to the North Waterflood Facility (NWF) building. The entire project area is within Section 21 T39N R78W (map attached) and will not impact any wet land areas but will cross one 2. What is the legal location? intermittent stream. The stream is presently dry. The project will include the clearing of vegetation from a 12 3. What is the duration of the project? foot wide construction corridor along the route, digging a 5 foot deep trench, welding and placing the plastic

91

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program  

Broader source: Energy.gov [DOE]

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

92

Uniform Methods Project for Determining Energy Efficiency Program Savings |  

Broader source: Energy.gov (indexed) [DOE]

for Determining Energy Efficiency Program for Determining Energy Efficiency Program Savings Uniform Methods Project for Determining Energy Efficiency Program Savings Under the Uniform Methods Project, DOE is developing a framework and a set of protocols for determining the energy savings from specific energy efficiency measures and programs. The protocols provide a straightforward method for evaluating gross energy savings for common residential and commercial measures offered in ratepayer-funded initiatives in the United Sates. They represent a refinement of the body of knowledge supporting energy efficiency evaluation, measurement, and verification (EM&V) activities. They have been written by technical experts within the field and reviewed by industry experts. Read the first set of protocols published April 2013.

93

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Perez Clean Power Research Napa, California 94558 and Albany, New York 12203 Contract Number: 500Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT UTILITY SYSTEM CAPACITY AND CUSTOMER DEMAND VALUE OF PHOTOVOLTAIC Prepared for: California Energy Commission Prepared by: Clean

94

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

in their areas of expertise. Dr. Ruth Yanai (State University of New York, College of Environmental SciencePublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT POTENTIAL POSITIVE Energy Commission Prepared by: William Stewart, Robert F. Powers, Kathyrn McGown, Lindsay Chiono

95

Project Green: Student-Driven Water Efficiency Programs  

E-Print Network [OSTI]

Project Green: Student-Driven Water Efficiency Programs #12;3 quick facts 1. BS and MS in Construction Management from Colorado State University Focused on Sustainability and Green Schools 2. Work 40 languages **38% of students do not speak English at home We are SCUSD #12;Green apple logo Old

California at Davis, University of

96

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT EVALUATION OF EXISTING This report was prepared as the result of work sponsored by the California Energy Commission. It does: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12;Prepared by: Primary

97

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

(RD&D) projects to benefit the electricity and natural gas ratepayers in California. The Energy for natural gas RD&D. The PIER program strives to conduct the most promising public interest energy: · Buildings EndUse Energy Efficiency · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable

98

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, and demonstration (RD&D) projects to benefit the electricity and natural gas ratepayers in California. The Energy EndUse Energy Efficiency · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable Energy for natural gas RD&D. PIER funding efforts are focused on the following RD&D program areas: · Buildings

99

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Cancels DOE O 413.3A, Chg 1 dated 6-28-06.

2010-11-29T23:59:59.000Z

100

Plutonium Immobilization Project, Project Office Quality Assurance Program Description Revision 1  

SciTech Connect (OSTI)

''The quality assurance activity involves the establishment and implementation of the Quality Assurance Program and the development of a Quality Assurance Plan and Procedures. Quality Assurance provides the plans, procedures and controls that are required for repository acceptance and the immobilization plant licensing and design activities.'' The Plutonium Immobilization Project (PIP) has a policy that all development, testing and operational activities be planned and performed in accordance with its customer's needs and expectations, and with a commitment to excellence and continuous improvement. The Immobilization Development and Testing (D&T) Quality Assurance Program establishes implementation requirements which, when completed, will ensure that the program development and test activities conform to the appropriate QA requirements. In order for the program to be effective, a designated quality lead must be in place at the Project Office and each participating site.

Kan, T.

1998-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

102

IT PROJECT MANAGEMENT PROGRAM A ten-week program covering best practices in IT project management  

E-Print Network [OSTI]

with managing and working with people such as team composition and leadership, conflict resolution and politics Professional, and the software will also be available in the Institute's dedicated laboratory. YOU WILL LEARN: · Development Methodologies · System Architecture · Organizing and Staffing the Project Team · Conflict

Schaefer, Marcus

103

NETL: News Release - SECA Fuel Cell Program Selects Two Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9, 2008 9, 2008 SECA Fuel Cell Program Selects Two Projects Low-Cost Fuel Cell Systems to Address Energy Security, Climate and Water Challenges WASHINGTON, DC - The U.S. Department of Energy (DOE) has selected two projects for the Department's Solid State Energy Conversion Alliance (SECA) Program portfolio. The projects, focused on enhancing energy security through zero-emission applications, will be led by UTC Power, a United Technologies Corporation, in partnership with Delphi Corporation, and Rolls-Royce Fuel Cell Systems (U.S.) Inc. The Rolls-Royce project will include work at Ohio's Stark State College Fuel Cell Prototyping Center, which is also supported through a National Science Foundation grant. From an environmental perspective, fuel cells are one of the most attractive technologies for generating electricity. Solid oxide fuel cells operate by separating and transferring oxygen across a solid electrolyte membrane, where it reacts with a fuel - such as synthesis gas derived from coal, biofuels or natural gas - to produce steam and carbon dioxide (CO2). Condensing the steam results in a pure stream of CO2 gas; this can be readily captured for storage or other use in a central location. This feature, coupled with the well-known fact that fuel cell efficiency does not depend on high temperatures, results in near-zero emissions (e.g., NOx < 0.5ppm) at equivalent or reduced cost-of-electricity compared to today's power generation.

104

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect (OSTI)

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

105

Low Dose Radiation Research Program: DOE / NASA Joint Funded Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE/NASA Joint Funded Projects DOE/NASA Joint Funded Projects NASA Source Photo Space explorers are subject to exposure to low dose ionizing radiation. Research that helps determine health risks from this exposure is funded by NASA and DOE. Source: NASA DOE's Low Dose Program and the National Aeronautics and Space Administration (NASA) jointly fund new research to develop a better scientific basis for understanding risks to humans from exposures to low doses or low fluences of ionizing radiation. Research must focus on elucidating molecular mechanisms and pathways involved in normal radiobiological responses to low dose exposure, and must have the potential to ultimately increase understanding of health outcomes from radiation exposures that are at or near current workplace exposure

106

LIGHTING RESEARCH PROGRAM Project 4.2 The ENERGY STAR Residential Light  

E-Print Network [OSTI]

LIGHTING RESEARCH PROGRAM Project 4.2 The ENERGY STAR® Residential Light Fixture Advancement Report Applied Proactive Technologies/Architectural Energy Corporation PIER Lighting Research Program 2 Applied Proactive Technologies/Architectural Energy Corporation PIER Lighting Research Program 3 500

107

Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project  

SciTech Connect (OSTI)

This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

1988-03-01T23:59:59.000Z

108

FEDERAL ACQUISITION CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM)  

Broader source: Energy.gov (indexed) [DOE]

CERTIFICATION FOR PROGRAM AND PROJECT CERTIFICATION FOR PROGRAM AND PROJECT MANAGERS (FAC-P/PM) EXECUTIVE SUMMARY 1. Purpose. The Federal Acquisition Certification for Program and Project Managers (FAC-P/PM) establishes general training and experience requirements for program and project managers in civilian agencies. The FAC- P/PM focuses on essential competencies needed for program and project managers; the program does not include functional or technical competencies, such as those for information technology, or agency- specific competencies. 2. Background. The quality and effectiveness of the federal acquisition process depend on the development of a capable and competent workforce. The Services Acquisition Reform Act of 2003 (SARA, P.L. 108-136) expanded the definition of acquisition to include functions performed by program and project managers.

109

Business Manangement System(BMS), RL-2008/Project Hanford Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

110

Project Tracking System (PTS). User's manual and program documentation  

SciTech Connect (OSTI)

The Bartlesville Energy Technology Center (BETC) Project Tracking System (PTS) is a computerized information system developed to generate automatic updates to other Department of Energy (DOE) systems such as the Business Management Information System (BMIS), as well as to aid in the in-house tracking of the cost, schedule, and manpower status of the approximately 200 BETC contracts. The PTS data base contains administrative and limited technical information on planned, active, and terminated contracts. The PTS software and data base are resident upon BETC's PDP 11/70 computer, which utilizes the RSX-11M operating system. PTS programming was done in the BASIC + II and DATATRIEVE languages, which allow for conversational, English-like interactions between the user and the system during both input and output sessions.

Not Available

1983-11-01T23:59:59.000Z

111

Sharing Success: State Energy Program Special Projects Results  

Broader source: Energy.gov [DOE]

The State Energy Program was created in 1996 by an act of Congress through the consolidation of the State Energy Conservation Program and the Institutional Conservation Program.

112

Mapping cost-effective farmland preservation priorities A project funded the USDA NRI Rural Development Program  

E-Print Network [OSTI]

Mapping cost-effective farmland preservation priorities A project funded the USDA NRI Rural Development Program Project Director: Frank Davis, University of California Santa Barbara Project Staff: David Stoms, Jason Kreitler Project Advisors: Tim Duane, Julie Gustanski, Ralph Heimlich, Dan Press, Peter

California at Santa Barbara, University of

113

FY 2008-2018 F&W Program Project Solicitation Section 10. Narrative  

E-Print Network [OSTI]

FY 2008-2018 F&W Program Project Solicitation Section 10. Narrative Project ID: 2008-301-00 Lead Transport Inc. 1999 gasoline spill settlement fund. It is anticipated that over the next ten years (2008

114

Russian Health Studies Program- Overview of Active and Completed Projects  

Broader source: Energy.gov [DOE]

DOE currently sponsors six projects. Of these, five core projects focus on the epidemiology and dosimetry of the Techa River population and the Mayak workers

115

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network [OSTI]

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

116

Summary results of an assessment of research projects in the superconductivity for electric power systems program  

SciTech Connect (OSTI)

The Office of Program Analysis undertook an assessment of 37 research projects sponsored by the High Temperature Superconductivity Program. This report summarizes the results of the review. Rating factors included scientific and technical merit, mission relevance, appropriateness and level of innovation, quality of project team, productivity, and probable impact on the program`s mission. Some research needs and opportunities are described that were identified by the reviewers in the areas of wire development, deposited film technology, and systems development.

NONE

1992-10-01T23:59:59.000Z

117

Market Data for Renewable Energy Projects and Programs at NREL | Open  

Open Energy Info (EERE)

for Renewable Energy Projects and Programs at NREL for Renewable Energy Projects and Programs at NREL Jump to: navigation, search Logo: Market Data for Renewable Energy Projects and Programs at NREL Name Market Data for Renewable Energy Projects and Programs at NREL Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Topics Market analysis Resource Type Dataset, Guide/manual Website http://www.nrel.gov/analysis/r References Market Data for Renewable Energy Projects and Programs at NREL[1] Abstract This Web page includes market data for renewable energy technologies and programs, presented in individual reports for each area. Data includes market penetration; industry trends; cost, price, and performance trends; policy and market drivers; as well as future outlook. Overview

118

Proposition 39 Implementation Program Funding Allocation for Energy Projects Majority of  

E-Print Network [OSTI]

will help ensure greater long-term energy savings and additional job creation, the Program: · Allows smallProposition 39 Implementation Program ­ Funding Allocation for Energy Projects Majority) $15,000 for LEAs with 100 or less ADA, plus FRPM To support deeper energy retrofit projects which

119

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report  

SciTech Connect (OSTI)

This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

Bolivar, S.L.

1996-07-01T23:59:59.000Z

120

Federal Energy Management Program: Renewable Energy Project Assistance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assistance Assistance Call for Projects FEMP recently issued a notice of intent to release a Funding Opportunity Announcement (FOA) that will provide grants to develop renewable energy projects. Read the call for projects. See box below for information on project assistance for this upcoming FOA. Request to Receive Project Assistance from FEMP Federal agencies interested in receiving FEMP project assistance must complete the renewable energy project assistance request form and email it to Boyan Kovacic. Applications will be processed on a weekly basis. For technical assistance on the upcoming FEMP FOA "Assisting Federal Facilities with Energy Conservation Technologies" (AFFECT), agencies must submit a letter stating their need for assistance and their intent to apply for the FOA in addition to completing the renewable energy project assistance request form.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

NREL: Department of Defense Energy Programs - Energy Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Net Zero Initiative Projects Photo a man dressed in Army fatigues plugging in an electric car. In 2012, nine pilot projects were chosen for the U.S. Army Net Zero Initiative to...

122

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, and project oversight. Integrated Combined Heat and Power Systems Corporation, Gearoid Foley for the Combined Heat and Power project (Contr INTEGRATED COOLING, HEATING AND ENGINE POWER MODULE FEBRUARY 2010 CEC5002009098 Prepared for: California

123

Section 1222 Program Proposed Plains & Eastern Project Frequently Asked Questions  

Broader source: Energy.gov [DOE]

Note: DOE intends to update these FAQs as more information about the proposed project and the review process becomes available.

124

Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

125

Carbon Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program:  

Open Energy Info (EERE)

Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Closing Long-Term CO2 Geological Storage Gaps Relevant to Regulatory and Policy Development Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carbon Dioxide (CO2) Capture Project Phase 2 (CCP2) - Storage Program: Closing Long-Term CO2 Geological Storage Gaps Relevant to Regulatory and Policy Development Focus Area: Clean Fossil Energy Topics: System & Application Design Website: www.sciencedirect.com/science?_ob=MiamiImageURL&_cid=277910&_user=10&_ Equivalent URI: cleanenergysolutions.org/content/carbon-dioxide-co2-capture-project-ph Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation This paper describes results of Phase 2 of the Storage Program of the

126

Utility Goals for the Efficiency Resource: Impact of PUC Rulemaking Project No. 39674 on Future Programs  

E-Print Network [OSTI]

Utility Goals for the Efficiency Resource: Impact of PUC Rulemaking Project No. 39674 on Future Programs Amy Martin CATEE Conference October 10, 2012 Overview ? Frontier Associates ? EUMMOT ? Utility Program Overview and Results to Date... Pricing & Resource Planning ? Energy Efficiency & Renewable Energy Programs ? Market Research ? Regulatory Assistance ? Database Solutions ? EUMMOT Administrator Who is EUMMOT? Electric Utility Marketing Managers of Texas (EUMMOT...

Martin, A.

2012-01-01T23:59:59.000Z

127

NREL: Education Programs - Wind for Schools Project Funding Case Studies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wind for Schools Project Funding Case Studies Wind for Schools Project Funding Case Studies August 26, 2013 The Wind for Schools project is part of the U.S. Department of Energy's (DOE's) Wind Powering America initiative. Since 2005, DOE provided funding for Wind Applications Centers in 11 Wind for Schools states, introducing teachers, students, and communities to wind energy applications and benefits. This Wind for Schools funding supported the project; it was not used to purchase turbines and equipment. Individual school champions emerged to find local funding mechanisms to purchase and install their turbines. On October 1, 2013, DOE will no longer fund the project; therefore, we feel that it is important to document the funding sources utilized by these states to purchase and install Wind for Schools project turbines. (1) By

128

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Energy.gov [DOE]

This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental...

129

Expanding the WisconSEN Program Project Fact Sheet  

Broader source: Energy.gov [DOE]

This fact sheet contains details regarding a Save Energy Now industrial energy efficiency project that the U.S. Department of Energy funded in Wisconsin.

130

SECA Fuel Cell Program Moves Two Key Projects Into Next Phase | Department  

Broader source: Energy.gov (indexed) [DOE]

SECA Fuel Cell Program Moves Two Key Projects Into Next Phase SECA Fuel Cell Program Moves Two Key Projects Into Next Phase SECA Fuel Cell Program Moves Two Key Projects Into Next Phase February 5, 2009 - 12:00pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) has selected two projects for continuation within the Department's Solid State Energy Conversion Alliance (SECA) Program research portfolio. The projects--led by FuelCell Energy, in partnership with VersaPower Systems, and Siemens Energy--have successfully demonstrated solid oxide fuel cells (SOFCs) designed for aggregation and use in coal-fueled central power generation. Further development of these low-cost, near-zero emission fuel cell systems will substantially contribute to solving the Nation's energy security, climate, and water challenges.

131

Advanced Seismic data Analysis Program (The "Hot Pot Project")  

Open Energy Info (EERE)

data Analysis Program (The "Hot Pot Project") data Analysis Program (The "Hot Pot Project") Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Advanced Seismic data Analysis Program (The "Hot Pot Project") Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Validation of Innovative Exploration Technologies Project Description The proposed exploration surveys, drilling programs, data analysis and report generation will require 18 months to complete. It is anticipated that the resource confirmation drilling program will be successful in intersecting structural targets predicted by the 2.5-D advanced seismic analysis and model construction, effectively validating use of this innovative technology as a means to reduce drilling risk through improved well targeting. Oski expects that temporary field jobs will be created during the drilling stage and that long-term direct and indirect jobs would be created once this geothermal resource is proven and a geothermal plant is designed, financed and built.

132

Project Listings by State, DOE Hydrogen Program FY 2010 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2010 Annual Progress Report DOE Hydrogen Program Alabama V.B.2 CFD Research Corp.: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 V.B.2 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 Alaska VIII.9 Tanadgusix Foundation: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 TDX Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 Alaska Center for Energy and Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . 1288

133

Northeast Oregon Hatchery Program Grande Ronde … Imnaha Spring Chinook Hatchery Project  

Broader source: Energy.gov (indexed) [DOE]

Northeast Oregon Hatchery Program Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Final Environmental Impact Statement Bonneville Power Administration July 2004 Northeast Oregon Hatchery Program -- Grande Ronde-Imnaha Spring Chinook Project i Table of Contents Page Chapter 1: Updated Summary and Project Description 1.1 Introduction..............................................................................................................1-1 1.2 Purpose and Need for the Proposed Action .............................................................1-2 1.3 Decisions to be Made and Responsible Officials ....................................................1-3 1.4 Summary of Public Involvement, Consultation, and Coordination.........................1-3

134

Innovative Clean Energy Projects - Title XVII Loan Program |...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

XVII) loan program provides loan guarantees to accelerate the deployment of innovative clean energy technology. The U.S. Department of Energy is authorized to issue loan...

135

Low Dose Radiation Research Program: Funded Project Descriptions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Funded Project Descriptions Funded Project Descriptions Non-Invasive Early Detection and Molecular Analysis of Low X-Ray Dose Effects in the Lens Jointly funded by NASA and DOE Principal Investigator: Lee Goldstein, M.D., Ph.D., Associate Professor in Psychiatry, Neurology, Ophthalmology, Pathology and Laboratory Medicine, & Biomedical Engineering, Boston University’s School Medicine, College of Engineering, and Photonics Center. Boston, Ma. The project includes a new DOE FWP (~$400 K over 3 years) to Lawrence Berkeley National Laboratory with Eleanor Blakely as Project Leader. The work includes a subcontract to support the collaboration of Polly Chang of SRI, International, Menlo Park, CA. and is scheduled to begin as early as August 2009. This proposal was submitted in response to the joint DOE/NASA

136

DOE Order Program and Project Management for the Acquisition...  

Office of Environmental Management (EM)

is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan,...

137

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

2000-10-13T23:59:59.000Z

138

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

2000-10-13T23:59:59.000Z

139

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

DISTRIBUTED ENERGY RESOURCE UTILITY INTERFACE Prepared for: California Energy Commission Prepared: California Energy Commission Bernard Treanton Project Manager Mike Gravely Office Manager Energy Systems Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees

140

The terrestrial ecosystem program for the Yucca Mountain Project  

SciTech Connect (OSTI)

DOE has implemented a program to monitor and mitigate impacts associated with site Characterization Activities at Yucca Mountain on the environment. This program has a sound experimental and statistical base. Monitoring data has been collected for parts of the program since 1989. There have been numerous changes in the Terrestrial Ecosystems Program since 1989 that reflect changes in the design and locations of Site Characterization Activities. There have also been changes made in the mitigation techniques implemented to protect important environmental resources based on results from the research efforts at Yucca Mountain. These changes have strengthened DOE efforts to ensure protection of the environmental during Site Characterization. DOE,has developed and implemented an integrated environmental program that protects the biotic environment and will restore environmental quality at Yucca Mountain.

Ostler, W.K.; O`Farrell, T.P.

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

2011-05-18T23:59:59.000Z

142

Federal assistance program. Geothermal technology transfer. Project status report, May 1986  

SciTech Connect (OSTI)

Progress for the month of May, 1986, is described. Projects include evaluation of direct heating of greenhouses and other businesses, technology transfer to consultants, developers and users, and program monitor activities. (ACR)

Lienau, P.J.; Culver, G.

1986-05-01T23:59:59.000Z

143

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report  

SciTech Connect (OSTI)

This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

Bolivar, S.L.

1996-03-01T23:59:59.000Z

144

Projection and restriction methods in geometric programming and related problems  

Science Journals Connector (OSTI)

Mathematical programming problems with unattained infima or unbounded optimal solution sets are dual to problems which lackinterior points, e.g., problems for which the Slater condition fails to hold or for which...

R. A. Abrams; C. T. Wu

1978-09-01T23:59:59.000Z

145

Draft reclamation program plan for site characterization; Yucca Mountain project  

SciTech Connect (OSTI)

As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation`s first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs.

NONE

1989-08-01T23:59:59.000Z

146

The Daily Princetonian -International fusion project will use Princeton physics lab Summer Program  

E-Print Network [OSTI]

to determine the viability of exploiting cold fusion as an energy source around the world. Much of the researchThe Daily Princetonian - International fusion project will use Princeton physics lab Summer Program | Previous | Next | Calendar International fusion project will use Princeton physics lab By ABBY WILLIAMS

147

AUBURN UNIVERSITY POLICY AND PROCEDURES ON PROGRAM INCOME ASSOCIATED WITH SPONSORED PROJECTS  

E-Print Network [OSTI]

AUBURN UNIVERSITY POLICY AND PROCEDURES ON PROGRAM INCOME ASSOCIATED WITH SPONSORED PROJECTS POLICY that further the objectives of the project for which the award was made and which are in accordance with the financial policies and procedures of Auburn University. A separate FOP will be established for processing

Tam, Tin-Yau

148

Fast Ignition Program in Japan "Progress of Fast Ignition Project; FIREX"  

E-Print Network [OSTI]

1 Fast Ignition Program in Japan "Progress of Fast Ignition Project; FIREX" Fast Ignition.4 Fusion , Laser Astrophysics, EUV, and so on are main projects Laser Spectroscopy NIFS, Okayama Univ., High Pressure EOS AIST Tokyo Inst. Tech Laser Acceleration, Terahertz Coherent X-Ray JAEA KPRI Fusion

149

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect (OSTI)

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

None

1988-10-01T23:59:59.000Z

150

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

VALIDATION OF A 25 KILOWATT DUAL SHELL STIRLING ENGINE APRIL 2009 CEC5002009061 Prepared for: California · Transportation Proof of Concept and Test Validation of a 25 kW Dualshell Stirling Engine final report for the 25kW Dualshell Stirling Engine Project (Contract Number 50004017) conducted by ADI Thermal Power

151

FY2010 2018 Fish and Wildlife Program Project Solicitation  

E-Print Network [OSTI]

Idaho Wildlife Mitigation-Middle Snake #12;2 A. Abstract The Southern Idaho Wildlife Mitigation project (SIWM) of the Idaho Department of Fish and Game (IDFG) proposes implementation of wildlife mitigation and/or scientific background In both the Mid and Upper Snake Provinces, human development

152

Program and Project Management for the Acquisition of Capital...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management DOE G 413.3-20, Change Control Management Guide DOE G 413.3-16A, Project CompletionCloseout Guide DOE G 413.3-7A, Risk Management Guide DOE G 413.3-6A, High...

153

The EPRI state-of-the-art cooling water treatment research project: A tailored collaboration program  

SciTech Connect (OSTI)

The EPRI Tailored Collaboration State-of-the-Art Cooling Water Treatment Research Program has been initiated with several electric utility participants. Started in January 1995, the program provides O&M cost reduction through improved cooling water system reliability and operation,. This effort is discussed along with the objectives and goals, the participants and project timetable. The program will provide three (3) main results to the participating utilities: cost effective optimization of cooling water treatment, production of a new Cooling Water Treatment Manual and updating of two (2) EPRI software products - SEQUIL and COOLADD. A review of the specific objectives, project timetable and results to date will be presented. 1 tab.

Zammitt, K. [Electric Power Research Institute, Palo Alto, CA (United States); Selby, K.A. [Puckorius & Associates, Inc., Evergreen, CO (United States); Brice, T. [Entergy Operations - River Bend Station, St. Francisville, LA (United States)] [and others

1996-08-01T23:59:59.000Z

154

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

TO THE DETECTION OF SURFACE DEFORMATION IN THE GEOTHERMAL FIELDS OF IMPERIAL VALLEY, CALIFORNIA MARCH 2010 in the Geothermal Fields of Imperial Valley, California. California Energy Commission, PIER Program. CEC5002010019 "Application of InSAR to the Detection of Surface Deformation in the Geothermal Fields of Im- perial Valley

155

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

GEOTHERMAL WELL FB4 Prepared for: California Energy Commission Prepared by: Fort Bidwell Indian Community Geothermal Well FB4. California Energy Commission, PIER Renewables Program. CEC-500-2012-061. i #12;ii #12 · Renewable Energy Technologies · Transportation Assessment of Fort Bidwell Geothermal Well FB4 is the final

156

Low Dose Radiation Research Program: Current Funded Project Descriptions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Funded Project Descriptions Funded Project Descriptions Effects Of Low Doses of Radiation on DNA Repair Jointly funded by NASA and DOE Eric J Ackerman Pacific Northwest National Laboratory Richland, WA 99352 Dr. Ackerman will study the effect of low doses of ionizing radiation on the repair of different types of damage to DNA, including damage from ionizing radiation and that produced by the normal internal operation of the cell. Using a very sensitive technique called host cell reactivation assay (HCR), he will quantitatively measure the repair of each type of DNA damage and thereby measure if the cellular repair system itself has been damaged. He will also determine if unique forms of DNA repair system damage are induced by low doses of cosmic radiation exposure present during space

157

Low Dose Radiation Research Program: Project Descriptions-Archive  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Descriptions-Archive Project Descriptions-Archive Effects Of Low Doses of Radiation on DNA Repair Eric J Ackerman (former PNNL) (Jointly funded by NASA and DOE) Pacific Northwest National Laboratory Richland, WA Dr. Ackerman will study the effect of low doses of ionizing radiation on the repair of different types of damage to DNA, including damage from ionizing radiation and that produced by the normal internal operation of the cell. Using a very sensitive technique called host cell reactivation assay (HCR), he will quantitatively measure the repair of each type of DNA damage and thereby measure if the cellular repair system itself has been damaged. He will also determine if unique forms of DNA repair system damage are induced by low doses of cosmic radiation exposure present during space

158

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

2006-07-28T23:59:59.000Z

159

Corporate Information Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Corporate Information Systems Corporate Information Systems Corporate Information Systems The mission of the Office of Corporate Information Systems (CF-40) is to plan and manage the design, development, operation and maintenance of the Department's Integrated Management Navigation (iManage) program and projects; identify and implement business process automation initiatives; provide technical support for legacy systems operations and maintenance; provide technical support for web design, development and maintenance; manage cyber security and enterprise architecture activities; and serve as the liaison to Chief Information Officer for Information Technology services. Functions: Plan and manage the design, integration, and implementation of the Department's corporate business systems through the iManage program,

160

UMTRA Project Administrative Files Collection Records Management Program  

SciTech Connect (OSTI)

The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

Not Available

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

162

Energy's Technology Research Project (TRP) Program W(C)-93-015  

Broader source: Energy.gov (indexed) [DOE]

U.S. and Foreign U.S. and Foreign Patent Rights in Inventions made in the course of or under arrangements entered into under the Department of Energy's Technology Research Project (TRP) Program W(C)-93-015 The Department of Energy (DOE) is one of a number of Federal agencies collaborating with the Advanced Research Projects Agency (ARPA) in the Technology Reinvestment Project (TRP). The TRP is a federal effort to develop "dual-use" technologies with both military and commercial applications, and to help small defense firms make the transition to commercial markets. It is anticipated to be a multi-year funding program and has been funded at approximately $472M in FY'93. The TRP is a key part of the President's Defense Reinvestment and Conversion Initiative. The TRP consists of eight statutory programs established under

163

Spent Nuclear Fuel Project document control and Records Management Program Description  

SciTech Connect (OSTI)

The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

MARTIN, B.M.

2000-05-18T23:59:59.000Z

164

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report  

SciTech Connect (OSTI)

This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

Bolivar, S.L.

1995-05-01T23:59:59.000Z

165

Yucca Mountain Project - Science & Technology Radionuclide Absorbers Development Program Overview  

SciTech Connect (OSTI)

The proposed Yucca Mountain repository is anticipated to be the first facility for long-term disposal of commercial spent nuclear fuel and high-level radioactive waste in the United States. The facility, located in the southern Nevada desert, is currently in the planning stages with initial exploratory excavations completed. It is an underground facility mined into the tuffaceous volcanic rocks that sit above the local water table. The focus of the work described in this paper is the development of radionuclide absorbers or ''getter'' materials for neptunium (Np), iodine (I), and technetium (Tc) for potential deployment in the repository. ''Getter'' materials retard the migration of radionuclides through sorption, reduction, or other chemical and physical processes, thereby slowing or preventing the release and transport of radionuclides. An overview of the objectives and approaches utilized in this work with respect to materials selection and modeling of ion ''getters'' is presented. The benefits of the ''getter'' development program to the United States Department of Energy (US DOE) are outlined.

Hong-Nian Jow; R.C. Moore; K.B. Helean; S. Mattigod; M. Hochella; A.R. Felmy; J. Liu; K. Rosso; G. Fryxell; J. Krumhansl; Y. Wang

2005-01-14T23:59:59.000Z

166

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems Projected Performance and Cost Parameters  

Broader source: Energy.gov [DOE]

This program record from the Department of Energy's Hydrogen and Fuel Cells Program provides information about the projected performance and cost parameters of on-board hydrogen storage systems.

167

PROJECT SUMMARY The proposed research program uses the restoration and conservation of biodiversity in woodlands  

E-Print Network [OSTI]

PROJECT SUMMARY The proposed research program uses the restoration and conservation of biodiversity and conservation planning process relates to biodiversity outcomes in complex metropolitan landscapes. Chicago, restoration and management of biodiversity on 360,000 acres of open space in the greater Chicago metropolitan

Illinois at Chicago, University of

168

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager  

E-Print Network [OSTI]

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager February 14 utilities to invest in DR Regional situational analysis � issues to address #12;Nationally � Demand ResponseSource: FERC Demand Response & Advanced Metering Report, February 2011 Peak DR 65,000 MW 1,062 MW Peak DR

169

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project was  

E-Print Network [OSTI]

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project grant was developed for the purposes of providing faculty, students and staff the opportunity to work Ways to School," which promotes safe, healthy, sustainable transportation options to local schools. Now

Pulfrey, David L.

170

EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement  

SciTech Connect (OSTI)

The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

Electric Research and Management, Inc.

1997-03-11T23:59:59.000Z

171

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0207-1609) Planar Energy - Solid-State All Inorganic Rechargeable Lithium Batteries Location: Florida Proposed Action or Project Description: American Recover), and Reinvestment Act: ~ Funding will support laboratory, bench scale, and pilot scale research and development on lithium battery manufacturing processes for use in electrical energy storage for transportation. Categorical Exclusion(s) Applied: x ~ 83.6 Sitinglconstruct1onJoperationldecommlssloning of facilities for bench-scale research, conventional laboratory operations, smalJ..scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 £::lli:klkrc

172

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

nt of n y nt of n y Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1508) NAVITASMAX - Novel Tuning of Critical Fluctuations for Advanced Thermal Energy Storage Location: *- Multiple States - Arizona, Massachusetts, New York, Colorado Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support a proof-of-concept project that evaluates and optimizes simple and complex supercritical fluids for use as novel heat storage, transfer, and working fluids in solar and nuclear applications. Proposed work consists of indoor laboratory-based research and development (R&D), modeling, and analysis, including (1) developing theoretical models to explore inhomogeneities and heat capacity anomalies in supercritical fluids, and prove potential to increase heat capacity over ranges of

173

Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

Holland, Robert C.

2005-09-01T23:59:59.000Z

174

NETL: News Release - SECA Fuel Cell Program Moves Two Key Projects Into  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5, 2009 5, 2009 SECA Fuel Cell Program Moves Two Key Projects Into Next Phase Projects Continue Push for Low-Cost, Environmentally Friendly Coal Power Washington, DC-The U.S. Department of Energy (DOE) has selected two projects for continuation within the Department's Solid State Energy Conversion Alliance (SECA) Program research portfolio. The projects-led by FuelCell Energy, in partnership with VersaPower Systems, and Siemens Energy-have successfully demonstrated solid oxide fuel cells (SOFCs) designed for aggregation and use in coal-fueled central power generation. Further development of these low-cost, near-zero emission fuel cell systems will substantially contribute to solving the Nation's energy security, climate, and water challenges. The selections were based upon an assessment of demonstrated progress in developing high-performance, low-cost SOFC technology. FuelCell Energy is testing two ~10kilowatt SOFC stacks incorporating planar cells; each has surpassed 4,700 hours of operation to date. Similarly, Siemens is testing a ~10kilowatt SOFC stack incorporating its new higher power Delta cells, with 2,500 hours of operation to date. With the continuation, these projects will pursue cell materials and design development to further improve performance, reduce cost, and integrate the cells into larger stacks for evaluation and incorporation into larger demonstrations beginning in 2012.

175

Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report  

SciTech Connect (OSTI)

This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project`s quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal.

Bolivar, S.L.; Burningham, A.; Chavez, P. [and others

1994-03-01T23:59:59.000Z

176

Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

United States. Bonneville Power Administration.

1995-09-01T23:59:59.000Z

177

Plutonium immobilization project development and testing quality assurance program description - February 1999  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work.

MacLean, L M; Ziemba, J

1999-02-01T23:59:59.000Z

178

Small Business Innovation Research (SBIR) Hydrogen Program New Projects Awarded in FY 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2011 Annual Progress Report DOE Hydrogen and Fuel Cells Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve research and development (R&D) objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit

179

U.S. DEPARTMENT OF ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO 2 THIS PAGE INTENTIONALLY LEFT BLANK OFFICE OF FOSSIL ENERGY SOLID OXIDE FUEL CELLS PROGRAM | 2013 PROJECT PORTFOLIO 3 Disclaimer DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not neces-

180

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

nergy nergy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1544) Sheetak Inc. - Thermoelectric Reactors for Efficient Automotive Thermal Storage Location: *- Multiple States - New York, Pennsylvania, Texas Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support development of a novel system of thermoelectric reactors for efficient automotive thermal energy storage (TREATS) in electric vehicle and plug-in hybrid electric vehicle Heating, Ventilation, and Cooling (HVAC) systems. Proposed work consists of indoor laboratory-based research and development, including (1) experimentation and analysis to assess the mechanics and dynamics of thermoelectric reactors, (2) design, fabrication, testing, and analysis of hot and cold reactors, (3) design, fabrication, testing, and

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Letter of Intent for RPP Characterization Program Process Engineering and Hanford Analytical Services and Characterization Project  

SciTech Connect (OSTI)

The Characterization Project level of success achieved by the River Protection Project (RPP) is determined by the effectiveness of several organizations across RPP working together. The requirements, expectations, interrelationships, and performance criteria for each of these organizations were examined in order to understand the performances necessary to achieve characterization objectives. This Letter of Intent documents the results of the above examination. It formalizes the details of interfaces, working agreements, and requirements for obtaining and transferring tank waste samples from the Tank Farm System (RPP Process Engineering, Characterization Project Operations, and RPP Quality Assurance) to the characterization laboratory complex (222-S Laboratory, Waste Sampling and Characterization Facility, and the Hanford Analytical Service Program) and for the laboratory complex analysis and reporting of analytical results.

ADAMS, M.R.

2000-02-25T23:59:59.000Z

182

Hydrologic Resources Management Program and Underground Test Area Project FY 2000 Progress Report  

SciTech Connect (OSTI)

This report highlights the results of FY 2000 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) Project. This is the latest in a series of annual reports published by LLNL-ANCD to document recent investigations of radionuclide migration and transport processes at the Nevada Test Site (NTS). The HRMP is sponsored by Defense Programs (DP) at the U.S. Department of Energy, Nevada Operations Office (DOENV), and supports DP operations at the NTS through studies of radiochemical and hydrologic processes that are relevant to the DP mission. Other organizations that support the HRMP include Los Alamos National Laboratory (LANL), the U.S. Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the U.S. Environmental Protection Agency (EPS), and Bechtel Nevada (BN). The UGTA Project is sponsored by the Environmental Management (EM) program at DOENV; its goal is to determine the extent of radionuclide contamination in groundwater resulting from underground nuclear testing at the NTS. The project strategy follows guidelines set forth in a Federal Facilities Agreement and Consent Order between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Participating contractors include LLNL (both ANCD and the Energy and Environmental Sciences Directorate), LANL, USGS, DRI, BN, and IT Corporation (with subcontract support from Geotrans Inc.).

Davisson, M L; Eaton, G F; Hakemi, N L; Hudson, G B; Hutcheon, I D; Lau, C A; Kersting, A B; Kenneally, J M; Moran, J E; Phinney, D L; Rose, T P; Smith, D K; Sylwester, E R; Wang, L; Williams, R; Zavarin, M

2001-07-01T23:59:59.000Z

183

Wind for Schools Project Curriculum Brief (Fact Sheet), Wind And Water Power Program (WWPP)  

Wind Powering America (EERE)

Introduction Introduction The U.S. Department of Energy's (DOE's) 20% Wind Energy by 2030 report recommends expanding educa- tion to ensure a trained workforce to meet the projected growth of the wind industry and deployment. Although a few U.S. higher education institu- tions offer wind technology education programs, most are found in community and technical colleges, resulting in a shortage of programs preparing highly skilled graduates for wind industry careers. Further, the United States lags behind Europe (which has more gradu- ate programs in wind technology design and manufacturing) and is in danger of relinquishing the economic benefits of domestic production of wind turbines and related components and services to European countries. DOE's Wind Powering America initia-

184

Data and projections on US electric-utility DSM programs: 1989--1997  

SciTech Connect (OSTI)

All US electric utilities are required to report to the Energy Information Administration (EIA) data on their demand-side management (DSM) programs. These data provide a comprehensive view of utility DSM-program costs and effects (energy savings and load reductions) for 1989, 1990, 1991, and 1992 as well as projections for 1993 and 1997. For 1992, US utility DSM programs cost almost $2.4 billion, saved 31,800 GWh, and cut potential peak demand by 32,900 MW. Normalized by retail revenues, sales, and peak demand, utilities spent 1.3% of their revenues to achieve energy and demand reductions of 1.2 and 6.0%, respectively.

Hirst, E.

1994-12-01T23:59:59.000Z

185

Quality Assurance (QA) Program Plan Conceptual Design Phase of Project W-521 Waste Feed Delivery Systems [SUPERSEDED BY RPP-6649 Rev. 0  

SciTech Connect (OSTI)

The Quality Assurance Program Plan (QAPP) describes the quality assurance implementation strategy for Project W-521 during conceptual design.

WHITE, K.A.

2000-08-02T23:59:59.000Z

186

The Employee Stress and Alcohol Project: The development of a computer-based alcohol abuse prevention program for employees  

Science Journals Connector (OSTI)

The Employee Stress and Alcohol Project (ESAP) developed an interactive computer-based alcohol abuse prevention and early intervention program accessible to employees over the Internet. Behavioral health research...

Robert A. Matano Ph.D.

2000-05-01T23:59:59.000Z

187

An effective approach to choosing project, program and portfolio management software at a large and geographically diverse company  

E-Print Network [OSTI]

Selecting and deploying an IT tool can be very complicated and expensive. This paper studies a particular approach to choosing project, program and portfolio management software at one large and geographically diverse ...

Brost, Missy M. (Missy Marie)

2009-01-01T23:59:59.000Z

188

Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000  

SciTech Connect (OSTI)

The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical--can continue in its role as a key component in the U.S. and world energy markets. The CCT Program also has global importance in providing clean, efficient coal-based technology to a burgeoning energy market in developing countries largely dependent on coal. Based on 1997 data, world energy consumption is expected to increase 60 percent by 2020, with almost half of the energy increment occurring in developing Asia (including China and India). By 2020, energy consumption in developing Asia is projected to surpass consumption in North America. The energy form contributing most to the growth is electricity, as developing Asia establishes its energy infrastructure. Coal, the predominant indigenous fuel, in that region will be the fuel of choice in electricity production. The CCTs offer a means to mitigate potential environmental problems associated with unprecedented energy growth, and to enhance the U.S. economy through foreign equipment sales and engineering services.

NONE

2000-09-01T23:59:59.000Z

189

California Hydrogen Infrastructure Project - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Edward C. Heydorn Air Products and Chemicals, Inc. 7201 Hamilton Boulevard Allentown, PA 18195 Phone: (610) 481-7099 Email: heydorec@airproducts.com DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Jim Alkire Phone: (720) 356-1426 Email: James.Alkire@go.doe.gov Contract Number: DE-FC36-05GO85026 Working Partners/Subcontractors: * University of California Irvine (UCI), Irvine, CA * National Fuel Cell Research Center (NFCRC), Irvine, CA Project Start Date: August 1, 2005 Project End Date: December 31, 2011 Fiscal Year (FY) 2012 Objectives Demonstrate a cost-effective infrastructure model in

190

EIS-0282: McIntosh Unit 4 TCFB Demonstration Project, Clean Coal Technology Program, Lakeland, Florida (also see EIS-0304)  

Broader source: Energy.gov [DOE]

The proposed project, selected under DOEs Clean Coal Technology Program, would demonstrate both Pressurized Circulating Fluidized Bed (PCFB) and Topped PCFB technologies. The proposed project would involve the construction and operation of a nominal 238 MWe (megawatts of electric power) combined-cycle power plant designed to burn a range of low- to high-sulfur coals.

191

The Life Safety Program Criteria Excerpt from Life Safety Funding Project Eligibility Criteria, dated 3/90.  

E-Print Network [OSTI]

The Life Safety Program Criteria Excerpt from Life Safety Funding Project Eligibility Criteria, dated 3/90. Projects eligible for Life Safety Funding should generally meet all of the following properly. 3. The unsafe /unhealthful condition may not be caused by a change in size or scope of the work

192

Project Listings by Organization, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

25 25 FY 2007 Annual Progress Report DOE Hydrogen Program XVI. Project Listings by Organization 3M V.E.1 Novel Approach to Non-Precious Metal Catalysts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .820 V.E.4 Advanced Cathode Catalysts and Supports for PEM Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .833 V.L.2 Adaptive Stack With Subdivided Cells for Improved Stability, Reliability, and Durability Under Automotive Load Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .874 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.M.3 New Polyelectrolyte Materials for High Temperature Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

193

Projects Listings by State, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program XV. Project Listings by State Alabama II.I.7 Production and Storage of Hydrogen from Coal Using C1 Chemistry . . . . . . . . . . . . . . . . . . . . . . . . .207 IV.B.5k Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . 514 V.D.21 Nanostructured Catalysts for Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .803 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.R.2 Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1042

194

General-purpose heat source project and space nuclear safety fuels program. Progress report, February 1980  

SciTech Connect (OSTI)

This formal monthly report covers the studies related to the use of /sup 238/PuO/sub 2/ in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are: General-Purpose Heat Source Development and Space Nuclear Safety and Fuels. Most of the studies discussed here are of a continuing nature. Results and conclusions described may change as the work continues. Published reference to the results cited in this report should not be made without the explicit permission of the person in charge of the work.

Maraman, W.J. (comp.)

1980-05-01T23:59:59.000Z

195

MHK Projects/NJBPU 1 5 MW Demonstration Program | Open Energy Information  

Open Energy Info (EERE)

NJBPU 1 5 MW Demonstration Program NJBPU 1 5 MW Demonstration Program < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.6032,"lon":-74.3401,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

196

RETROFIT RAMP-UP SELECTED PROJECTS* Austin, Texas ($10 Million): The Austin Climate Protection Retrofit Program will accelerate  

Broader source: Energy.gov (indexed) [DOE]

RETROFIT RAMP-UP SELECTED PROJECTS* RETROFIT RAMP-UP SELECTED PROJECTS* Austin, Texas ($10 Million): The Austin Climate Protection Retrofit Program will accelerate energy and water efficiency and integrated renewable energy improvements in private and commercial properties in the City of Austin and Austin Energy's service territory. The project will focus on alternative financing options for property owners, including new financing mechanisms, interest rate buy downs, and on-bill repayment. Boulder County, Colorado ($25 Million): Boulder County is partnering with the city of Denver, Garfield County, the Governor's Energy Office, Xcel Energy and others to launch the Colorado Retrofit Ramp-Up Program that will stimulate economic growth and investment in

197

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

198

Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

-237 -237 Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects November 2001 Prepared by Sujit Das Oak Ridge National Laboratory Jean H. Peretz The University of Tennessee Bruce Tonn Oak Ridge National Laboratory DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source: National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-605-6000 (1-800-553-6847) TDD: 703-487-4639 Fax: 703-605-6900 E-mail: info@ntis.fedworld.gov Web site: http://www.ntis.gov/support/ordernowabout.htm

199

DOE-STD-1149-2002; Safety and Health Program for DOE Construction Projects  

Broader source: Energy.gov (indexed) [DOE]

49-2002 49-2002 February 2002 DOE STANDARD SAFETY AND HEALTH PROGRAM FOR DOE CONSTRUCTION PROJECTS U.S. Department of Energy AREA OCSH Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-1149-2002 iii TABLE OF CONTENTS PARAGRAPH PAGE FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . .

200

MHK Projects/US Navy Wave Energy Technology WET Program at Marine Corps  

Open Energy Info (EERE)

US Navy Wave Energy Technology WET Program at Marine Corps US Navy Wave Energy Technology WET Program at Marine Corps Base Hawaii MCBH < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.4164,"lon":-157.784,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

General-purpose heat source project and space nuclear safety and fuels program. Progress report  

SciTech Connect (OSTI)

Studies related to the use of /sup 238/PuO/sub 2/ in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of LASL are presented. The three programs involved are: general-purpose heat source development; space nuclear safety; and fuels program. Three impact tests were conducted to evaluate the effects of a high temperature reentry pulse and the use of CBCF on impact performance. Additionally, two /sup 238/PuO/sub 2/ pellets were encapsulated in Ir-0.3% W for impact testing. Results of the clad development test and vent testing are noted. Results of the environmental tests are summarized. Progress on the Stirling isotope power systems test and the status of the improved MHW tests are indicated. The examination of the impact failure of the iridium shell of MHFT-65 at a fuel pass-through continued. A test plan was written for vibration testing of the assembled light-weight radioisotopic heater unit. Progress on fuel processing is reported.

Maraman, W.J.

1980-02-01T23:59:59.000Z

202

Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.  

SciTech Connect (OSTI)

Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and Johnson 1997; Pravecek and Kline 1998; Kline and Heindel 1999; Hebdon et al. 2000; Flagg et al. 2001; Kline and Willard 2001; Frost et al. 2002; Hebdon et al. 2002; Hebdon et al. 2003; Kline et al. 2003a; Kline et al. 2003b; Willard et al. 2003a; Willard et al. 2003b; Baker et al. 2004; Baker et al. 2005; Willard et al. 2005; Baker et al. 2006; Plaster et al. 2006; Baker et al. 2007). The immediate goal of the program is to utilize captive broodstock technology to conserve the population's unique genetics. Long-term goals include increasing the number of individuals in the population to address delisting criteria and to provide sport and treaty harvest opportunity. (1) Develop captive broodstocks from Redfish Lake sockeye salmon, culture broodstocks and produce progeny for reintroduction. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program reintroduction efforts. (4) Utilize genetic analysis to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, provide written activity reports, and participate in essential program management and planning activities. Idaho Department of Fish and Game's participation in the Snake River Sockeye Salmon Captive Broodstock Program includes two areas of effort: (1) sockeye salmon captive broodstock culture, and (2) sockeye salmon research and evaluations. Although objectives and tasks from both components overlap and contribute to achieving the same goals, work directly related to sockeye salmon captive broodstock research and enhancement will appear under a separate cover. Research and enhancement activities associated with Snake River sockeye salmon are permitted under NOAA permit numbers 1120, 1124, and 1481. This report details fish

Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

2008-12-17T23:59:59.000Z

203

Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program  

SciTech Connect (OSTI)

This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

Steinberg, D.; Porro, G.; Goldberg, M.

2012-04-01T23:59:59.000Z

204

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems … Projected Performance and Cost Parameters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Hydrogen and Fuel Cells Program Record DOE Hydrogen and Fuel Cells Program Record Record #: 9017 Date: July 02, 2010 Title: On-Board Hydrogen Storage Systems - Projected Performance and Cost Parameters Originators: Robert C. Bowman and Ned Stetson Approved by: Sunita Satyapal Date: August 10, 2010 This record summarizes the current technical assessments of hydrogen (H 2 ) storage system capacities and projected manufacturing costs for the scenario of high-volume production (i.e., 500,000 units/year) for various types of "on-board" vehicular storage systems. These analyses were performed within the Hydrogen Storage sub-program of the DOE Fuel Cell Technologies (FCT) program of the Office of Energy Efficiency and Renewable Energy. Item: It is important to note that all system capacities are "net useable capacities" able to be delivered to the

205

Mobile/Modular Deployment Project-Enhancing Efficiencies within the National Transuranic Waste Program.  

SciTech Connect (OSTI)

In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. First, the Waste Isolation Plant (WIPP) opened in March for the permanent disposal of TRU waste generated by, and temporarily stored at, various sites supporting the nation's defense programs. Second, the Hazardous Waste Facility Permit, issued by the New Mexico Environment Department, for WIPP became effective in November. While the opening of WIPP brought to closure a number of scientific, engineering, regulatory, and political challenges, achieving this major milestone led to a new set of challenges-how to achieve the Department of Energy's (DOE's) NTP end-state vision: All TRU waste from DOE sites scheduled for closure is removed All legacy TRU waste from DOE sites with an ongoing nuclear mission is disposed 0 All newly generated TRU waste is disposed as it is generated The goal is to operate the national TRU waste program safely, cost effectively, in compliance with applicable regulations and agreements, and at full capacity in a fully integrated mode. The existing schedule for TRU waste disposition would achieve the NTP vision in 2034 at an estimated life-cycle cost of $16B. The DOE's Carlsbad Field Office (CBFO) seeks to achieve this vision early-by at least 10 years- while saving the nation an estimated $48 to $6B. CBFO's approach is to optimize, or to make as functional as possible, TRU waste disposition. That is, to remove barriers that impede waste disposition, and increase the rate and cost efficiency of waste disposal at WIPP, while maintaining safety. The Mobile/Modular Deployment Project (MMDP) is the principal vehicle for implementing DOE's new commercial model of using best business practices of national authorization basis, standardization, and economies of scale to accelerate the completion of WIPP's mission. The MMDP is one of the cornerstones of the National TRU Waste System Optimization Project (1). The objective of the MMDP is to increase TRU waste shipment and disposal rates from currently certified sites as well as to provide a means to remove TRU waste from sites that have no characterization capability.

Triay, I. R. (Ines R.); Basabilvazo, G. B. (George B.); Countiss, S. (Sue); Moody, D. C. (David C.); Behrens, R. G. (Robert G.); Lott, S. A. (Sheila A.)

2002-01-01T23:59:59.000Z

206

Project Integration Office for the electric and hybrid vehicle R and D program. Eighth progress report, March 1982  

SciTech Connect (OSTI)

The Project Integration Office (PIO) was established to assist the US DOE with the direction and coordination of its multiple electric vehicle and hybrid electric vehicle research programs in order to get the maximum payoff from these research efforts. In addition, the PIO performs objective independent technical and economic studies, analyses and modeling, and maintains a technical information liaison service to facilitate information exchange between the program participants and industry. Progress in each of these activities is reported. (LCL)

Not Available

1982-04-19T23:59:59.000Z

207

Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 1  

SciTech Connect (OSTI)

In July, 1994, a team of materials specialists from Sandia and U S Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

Zanner, F.J.; Moffatt, W.C.

1995-07-01T23:59:59.000Z

208

Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2  

SciTech Connect (OSTI)

In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

Zanner, F.J.; Moffatt, W.C.

1995-07-01T23:59:59.000Z

209

PROJECTS FROM FEDERAL REGION IX DEPARTMENT OF ENERGY APPROPRIATE ENERGY TECHNOLOGY PROGRAM PART II  

E-Print Network [OSTI]

Facility Project Results: Energy Savings: The solar systemProject Results: Energy Savings: According to SolarSolar Energy For Composting Toilets .. 19 CA-682. Dry Creek Rancheria Solar Demonstration Project ..

Case, C.W.

2012-01-01T23:59:59.000Z

210

PROJECTS FROM FEDERAL REGION IX DEPARTMENT OF ENERGY APPROPRIATE ENERGY TECHNOLOGY PROGRAM PART II  

E-Print Network [OSTI]

o o o o Projects: Arizona California CA-173. Solar AquaDomeFrancisco, California Project Txpe: Award: SOLAR AQUADOMEOccidental, California P_roject T;:Ee: Award: SOLAR ENERGY

Case, C.W.

2012-01-01T23:59:59.000Z

211

Linear Programming in the Community In this project, we aimed to help a food pantry service by selecting the optimal  

E-Print Network [OSTI]

Linear Programming in the Community In this project, we aimed to help a food pantry service other food pantry services, where they distribute food by packets, each containing about the same a lottery system. Unlike other community food services where they distribute only the food donated to them

Yong, Alexander

212

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect (OSTI)

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

213

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program  

SciTech Connect (OSTI)

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energys (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 Quality Assurance Program under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as not applicable to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

2008-03-07T23:59:59.000Z

214

ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES  

SciTech Connect (OSTI)

This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D&D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D&D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D&D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D&D basic research projects will directly impact and provide solutions to DOE's D&D problems.

Phillips, Ann Marie

2003-02-27T23:59:59.000Z

215

Electron Microscopy Catalysis Projects: Success Stories from the High Temperature Materials Laboratory (HTML) User Program  

Broader source: Energy.gov [DOE]

2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

216

A description and status of the Yucca Mountain Project repository sealing program  

SciTech Connect (OSTI)

Yucca Mountain is being characterized to determine its suitability as a site for a high-level nuclear waste repository. The repository would be located in the unsaturated zone in fractured, welded tuff. Sealing of the repository is one element of the Yucca Mountain Project (YMP). This paper presents a description of the repository sealing program including the sealing design options, design requirements, design constraints, and the identification of the proposed sealing materials and field tests. Design options for the shafts include anchor-to-bedrock seals, shaft fill, and settlement plugs; in the underground facility options include drift seals, drainage channels, sumps, and bulkheads. Design requirements are those quantitative requirements imposed on the sealing design options to achieve a desired level of performance. Constraints are restrictions placed on the repository design by the sealing design. As (1) additional hydrogeologic data are obtained through site characterization, (2) approaches to allocating performance to various subsystems within the YMP are refined, and (3) the exploratory shafts and the associated testing results are developed, the design requirements and constraints may be modified and used in developing the License Application Design. 1 ref., 1 fig.

Fernandez, J.A.; Hinkebein, T.E.

1989-10-01T23:59:59.000Z

217

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

218

Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2007, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) Program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit research institution. For more information about

219

X. Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2006, excerpt from DOE Hydrogen Program 2006 Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

61 61 FY 2006 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non- profit research institution.

220

Impact of the Demand-Side Management (DSM) Program structure on the cost-effectiveness of energy efficiency projects  

SciTech Connect (OSTI)

Pacific Northwest Laboratory (PNL) analyzed the cost-effective energy efficiency potential of Fort Drum, a customer of the Niagara Mohawk Power Corporation (NMPC) in Watertown, New York. Significant cost-effective investments were identified, even without any demand-side management (DSM) incentives from NMPC. Three NMPC DSM programs were then examined to determine the impact of participation on the cost-effective efficiency potential at the Fort. The following three utility programs were analyzed: (1) utility rebates to be paid back through surcharges, (2) a demand reduction program offered in conjunction with an energy services company, and (3) utility financing. Ultimately, utility rebates and financing were found to be the best programs for the Fort. This paper examines the influence that specific characteristics of the DSM programs had on the decision-making process of one customer. Fort Drum represents a significant demand-side resource, whose decisions regarding energy efficiency investments are based on life-cycle cost analysis subject to stringent capital constraints. The structures of the DSM programs offered by NMPC affect the cost-effectiveness of potential efficiency investments and the ability of the Fort to obtain sufficient capital to implement the projects. This paper compares the magnitude of the cost-effective resource available under each program, and the resulting level of energy and demand savings. The results of this analysis can be used to examine how DSM program structures impact the decision-making process of federal and large commercial customers.

Stucky, D.J.; Shankle, S.A.; Dixon, D.R.; Elliott, D.B.

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Impact of the demand-side management (DSM) Program structure on the cost-effectiveness of energy efficiency projects  

SciTech Connect (OSTI)

Pacific Northwest Laboratory (PNL) analyzed the cost-effective energy efficiency potential of Fort Drum, a customer of the Niagara Mohawk Power Corporation (NMPC) in Watertown, New York. Significant cost-effective investments were identified, even without any demand-side management (DSM) incentives from NMPC. Three NMPC DMS programs were then examined to determine the impact of participation on the cost-effective efficiency potential at the Fort. The following three utility programs were analyzed: (1) utility rebates to be paid back through surcharges; (2) a demand reduction program offered in conjunction with an energy services company; and (3) utility financing. Ultimately, utility rebates and financing were found to be the best programs for the Fort. This paper examines the influence that specific characteristics of the DSM programs had on the decision-making process of one customer. Fort Drum represents a significant demand-side resource, whose decisions regarding energy efficiency investments are based on life-cycle cost analysis subject to stringent capital constraints. The structures of the DSM programs offered by NMPC affect the cost-effectiveness of potential efficiency investments and the ability of the Fort to obtain sufficient capital to implement the projects. This paper compares the magnitude of the cost-effective resource available under each program, and the resulting level of energy and demand savings. The results of this analysis can be used to examine how DSM program structures impact the decision-making process of federal and large commercial customers.

Stucky, D.J.; Shankle, S.A.; Dixon, D.R.; Elliott, D.B.

1995-06-01T23:59:59.000Z

222

Voluntary Protection Program Onsite Review, Soil and Groundwater Remediation Project- March 2007  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Soil and Groundwater Remediation Project is performing at a level deserving DOE-VPP recognition.

223

Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2  

SciTech Connect (OSTI)

The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with boundaries defined by the occupant's activity patterns and the field variation from the sources affecting the area. Such a stratification allows the researcher to determine which microenvironment are of most interest, and to methodically focus the areas, in order to gather the most relevant set of data.

Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

1997-03-11T23:59:59.000Z

224

FY09 WDI PROJECT FUNDING CUNY Unit Project Name  

E-Print Network [OSTI]

FY09 WDI PROJECT FUNDING CUNY Unit Project Name International Trade Operation & Procedures Program Simulation Lab College Initiative Bridge Program Workshop Project for Direct Care Workers Green Initiatives

Rosen, Jay

225

Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report  

SciTech Connect (OSTI)

This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.

Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

2008-04-08T23:59:59.000Z

226

Energy Conservation Recommendations, Implementation Costs, and Projected Paybacks for Georgia's Targeted Schools and Hospitals Conservation Program  

E-Print Network [OSTI]

During the past year the Georgia Tech Research Institute performed technical assistance studies on over 100 school and hospital buildings under a program funded by the Governor's Office of Energy Resources. This program is known as the Targeted...

Brown, M. L.; Moore, D. M.

1988-01-01T23:59:59.000Z

227

Vehicle Technologies Office Merit Review 2014: SuperTruck Program: Engine Project Review  

Broader source: Energy.gov [DOE]

Presentation given by Detroit Diesel Corporation at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about SuperTruck Program...

228

Voluntary Protection Program Onsite Review, Plutonium Finishing Plant Closure Project- May 2007  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Plutonium Finishing Plant Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

229

Voluntary Protection Program Onsite Review, River Corridor Closure Project- June 2012  

Broader source: Energy.gov [DOE]

Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

230

Voluntary Protection Program Onsite Review, Advanced Mixed Waste Treatment Project- May 2009  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Advanced Mixed Waste Treatment Project is continuing to perform at a level deserving DOE-VPP Star recognition.

231

Voluntary Protection Program Onsite Review, West Valley Demonstration Project- November 2009  

Broader source: Energy.gov [DOE]

Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

232

Voluntary Protection Program Onsite Review, West Valley Demonstration Project- June 2008  

Broader source: Energy.gov [DOE]

Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

233

Voluntary Protection Program Onsite Review, Waste Treatment Plant Construction Project- June 2010  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Waste Treatment Plant Construction Project is continuing to perform at a level deserving DOE-VPP Star recognition.

234

Voluntary Protection Program Onsite Review, Salt Waste Processing Facility Construction Project- February 2013  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Salt Waste Processing Facility Construction Project is continuing to perform at a level deserving DOE-VPP Star recognition.

235

The University of Texas at Austin Mechanical Engineering Design Projects Program  

E-Print Network [OSTI]

the design content component of the course (course emphasis is on design and synthesis, as well as analysis and Radiation Engineering Acoustics Robotics Dynamic Systems and Control PREVIOUS STUDENT PROJECT TITLES Temperature for a Combustion Gas Turbine Generator Redesign of Projection Welding Locating Pins and Bushings

Ben-Yakar, Adela

236

Landlord project multi-year program plan, fiscal year 1999, WBS 1.5  

SciTech Connect (OSTI)

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

Dallas, M.D.

1998-09-22T23:59:59.000Z

237

Energy's Technology Research Project (TRP) Program W(C)-93-015  

Energy Savers [EERE]

best practices to small firms; and 3) college and university programs to educate and train manufacturing engineers and technicians. The TRP has been jointly planned and is being...

238

Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program  

SciTech Connect (OSTI)

In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

Not Available

1992-12-01T23:59:59.000Z

239

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

240

Electric and Magnetic Fields (EMF) RAPID Engineering Program, Project 7: Development of Field Exposure Models  

SciTech Connect (OSTI)

The purpose of this project was to develop a conceptual model for estimating magnetic field (EMF) personal exposure (PE) of individuals or groups and construct a working model using existing data.

Bracken, T.D.; Rankin, R.F.; Wiley, J.A.

1999-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Factors to improve project performance : lessons from a Chilean urban agriculture program  

E-Print Network [OSTI]

This thesis investigates a Chilean urban agriculture project that has been underway for more than twenty years in Tome, a small coastal town located near the regional capital of Concepcion. Initiated in the early 1980s by ...

Scott, Maggie, 1975-

2003-01-01T23:59:59.000Z

242

Project Programming and Commissioning as a Risk Mitigation and Threat Analysis Tool  

E-Print Network [OSTI]

As a quality process, commissioning has been successfully used in the design, construction and validation process for over a decade with valuable results. Owners of high risk and complex projects are now starting to use the commissioning process...

Weiss, M. L.

2006-01-01T23:59:59.000Z

243

Project plan: Procedure system design for the Rocky Flats Plant Emergency Preparedness Program  

SciTech Connect (OSTI)

This procedure system is being designed for the Rocky Flats Plant Emergency Preparedness Program (EPP) to: assess the procedural needs of the Emergency Preparedness Program in light of the existing Rocky Flats Plant policies, plans, procedures, and applicable DOE orders; design the structure of the Emergency Preparedness Program procedural system based on the classes of procedures needed, the types of procedures (procedures vs job outline), the sections of procedures required, and the timetable for procedure maintenance; develop boiler plate formats for the various authors in writing the necessary standardized procedures; develop a list of all the necessary procedures that must be produced for Emergency Preparedness Program; and provide consistency for department-wide activities relating to the quality control in writing, distribution, and revising procedures for Emergency Preparedness Program. 23 refs., 18 figs.

Hodgin, C.R.; Brown-Strattan, M.

1989-10-01T23:59:59.000Z

244

Statement of Project Objectives  

Broader source: Energy.gov [DOE]

Statement of Project Objectives, from the Tool Kit Framework: Small Town University Energy Program (STEP).

245

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

Wind Powering America (EERE)

5 - January 2010 5 - January 2010 Two 600-kW wind turbines were installed on Deer Island in August 2009 next to the wastewater treatment facility's anaerobic digesters. Due to their proximity to Logan Airport, these generators were installed on unusually short 32-meter towers. WIND AND HYDROPOWER TECHNOLOGIES PROGRAM continued on page 2 > Kathryn Craddock, Sustainable Energy Advantage, LLC/PIX16710 Wind Projects Sprout Throughout New England NEWF is pleased to provide you with its fifth edition of the electronic NEWF newsletter. This newsletter provides updates on a broad range of project proposals and policy initiatives across New England during the funding hiatus...consider it a "catch-up" double issue. In past newsletters, we've relied on wind farm photo-simulations, photos of early construction

246

Linear Program to Select Energy Conservation Projects in an Existing Facility  

E-Print Network [OSTI]

Linear Programming is a mathematical optimization tool which has been widely used in the chemical and petrochemical industries for scheduling, product planning and utility system optimization. In an energy audit of a refinery or chemical plant...

Mak, J. Y.

1983-01-01T23:59:59.000Z

247

DOE Hydrogen and Fuel Cells Program Record 13013: Hydrogen Delivery Cost Projections - 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3013 Date: September 26, 2013 3013 Date: September 26, 2013 Title: H 2 Delivery Cost Projections - 2013 Originator: E. Sutherland, A. Elgowainy and S. Dillich Approved by: R. Farmer and S. Satyapal Date: December 18, 2013 Item: Reported herein are past 2005 and 2011 estimates, current 2013 estimates, 2020 projected cost estimates and the 2015 and 2020 target costs for delivering and dispensing (untaxed) H 2 to 10%- 15% of vehicles within a city population of 1.2M from a centralized H 2 production plant located 100 km from the city gate. The 2011 volume cost estimates are based on the H2A Hydrogen Delivery Scenario Analysis Model (HDSAM) V2.3 projections and are employed as the basis for defining the cost and technical targets of delivery components in Table 3.2.4 in the 2012 Delivery

248

United States Gulf Coast geopressured geothermal program. Special projects research and coordination assistance. Final report, 1 December 1978-30 October 1980  

SciTech Connect (OSTI)

Work for the period, December 1, 1978 through October 31, 1980, is documented. The following activities are covered: project technical coordination assistance and liaison; technical assistance for review and evaluation of proposals and contract results; technical assistance for geopressured-geothermal test wells; technical assistance, coordination, and planning of surface utilization program; legal research; and special projects. (MHR)

Dorfman, M.H.; Morton, R.A.

1981-06-01T23:59:59.000Z

249

General-purpose heat source project and space nuclear safety and fuels program. Progress reportt, January 1980  

SciTech Connect (OSTI)

This formal monthly report covers the studies related to the use of /sup 238/PuO/sub 2/ in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are the general-purpose heat source development and space nuclear safety and fuels. Most of the studies discussed here are of a continuing nature. Results and conclusions described may change as the work continues. Published reference to the results cited in this report should not be made without the explicit permission of the person in charge of the work.

Maraman, W.J. (comp.)

1980-04-01T23:59:59.000Z

250

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Broader source: Energy.gov (indexed) [DOE]

HIAR PORTS-2012-09-24 HIAR PORTS-2012-09-24 Site: Portsmouth Gaseous Diffusion Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System (CAS) Program Dates of Activity : 09/24/12 - 10/04/12 Report Preparer: Joseph P. Drago Activity Description/Purpose: The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy:

251

Project RU LlSON COPY ON-SITE RADIOLOGICAL PROGRAMS DURING REENTRY DISILLING THROUGH PRODUCTION TESTING  

Office of Legacy Management (LM)

RU LlSON RU LlSON COPY ON-SITE RADIOLOGICAL PROGRAMS DURING REENTRY DISILLING THROUGH PRODUCTION TESTING FINAL REPOAT EBERLlNE INSTRUMENT CORPORATION Santa Fe, New Mexico Date Published - December 1973 PREPARED FOR THE U. S. ATOMIC ENERGY COMMISSION N E V A D A OPERATIONS OFFICE UNDER CONTRACT NO. AT(26-11-294 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. Project RULISON ON-S1l'E RADIOLOGICAL PROGRAMS D U R I N G R E E N T R Y D R I L L I N G THROUGH PRODUCTION TESTING \ F I N A L REPORT EBERLINE INSTRUMENT CORPORATION . Santa Fe, New Mexico 1 Date Published - December 1973 NEVADA OPERATIONS OFFICE . UNDER CONTRACT NO. AT(26-11-294 NOTICE ~~~~ This report was prepared as an account of work sponsored by the United

252

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

Location: Location: New York Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on aero-thermodynamic Inertial separation for use in carbon capture processes.' Categorical Exclusion(s) Applied: x - 83.6 Siting/constructiOnloperationtdecommissioning of facilities for benctrscale research, conventionallaboralory operations, small-scala research and development and pilot projects *-For the complete DOE National Euyironmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 [lkk Here lois action vr'Ould not: threaten a violation of applicable statutory, regulatory, or pennit requirements for environment, safety, and health, including OOE andlor Executive Orders;

253

Transportation energy strategy: Project {number_sign}5 of the Hawaii Energy Strategy Development Program  

SciTech Connect (OSTI)

This study was prepared for the State Department of Business, Economic Development and Tourism (DBEDT) as part of the Hawaii Energy Strategy program. Authority and responsibility for energy planning activities, such as the Hawaii Energy Strategy, rests with the State Energy Resources Coordinator, who is the Director of DBEDT. Hawaii Energy Strategy Study No. 5, Transportation Energy Strategy Development, was prepared to: collect and synthesize information on the present and future use of energy in Hawaii`s transportation sector, examine the potential of energy conservation to affect future energy demand; analyze the possibility of satisfying a portion of the state`s future transportation energy demand through alternative fuels; and recommend a program targeting energy use in the state`s transportation sector to help achieve state goals. The analyses and conclusions of this report should be assessed in relation to the other Hawaii Energy Strategy Studies in developing a comprehensive state energy program. 56 figs., 87 tabs.

NONE

1995-08-01T23:59:59.000Z

254

The $2000 electric powertrain TRP Project. Baseline program final report, June 22, 1994--January 21, 1996  

SciTech Connect (OSTI)

The program objective was to develop and test technologies which improve the Northrop Grumman electric powertrain and lead to the volume production of an electric powertrain with the power, smoothness, and cost of an internal combustion engine. Accomplishments for this program are summarized in the following six topic areas and selected figures are shown: (1) The 100 hp powertrain was commercialized; (2) The Chrysler EPIC minivan was commercialized; (3) The 230 hp powertrain was commercialized; (4) The Blue Bird electric school and commercial buses were commercialized; (5) Related developments were initiated for DoD and energy systems applications; and (6) Several key powertrain technologies were researched and advanced.

NONE

1997-01-01T23:59:59.000Z

255

Project management computer programs: an approach to a better selection and understanding  

E-Print Network [OSTI]

. ! hermore, since this program is re] at ivc]y ncw, verv fc& poop] e have experience in using it. Thc. perso!!ne] entrusLcd wi!. n irs in!rogue! inn into the cnmnu!ation cen. ters undersL!nd cnly 'now to put It 'o!! line', but noL how to op&'I. ! t&, it...

Acevedo Bohorquez, Jorge Enrique

2012-06-07T23:59:59.000Z

256

LIGHTING RESEARCH PROGRAM Project 3.2 Load-Shedding Economic Analysis Report  

E-Print Network [OSTI]

Research Center 2540 Frontier Avenue, Suite 201 21 Union Street Boulder, Colorado 80301 Troy, New York For: California Energy Commission Public Interest Energy Research Program ConsultantReport Arnold Schwarzenegger, Governor October 2005 CEC-500-2005-141-A7 #12;Energy-Efficient Load-Shedding Lighting Technology

257

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

16) Penn State Univ. - 16) Penn State Univ. - Development of Rhodobacter as a Versatile Microbial Platform for Fuels Production Location: Pennsylvania Proposed Action or Project Description: American Recovcf)' and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on a rhodobacter fuel production platform for use in the production of energy dense, liquid transportation fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x w 83.6 SiUng/constructionloperationldecommission!ng of facilities for bench-scale research, convenUooallaboratory operations. small-scale research and development and pilot projects O+~For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 ('tick Here

258

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

3) Regents of the Univ. of California - 3) Regents of the Univ. of California - Electro-Autotrophic Synthesis of Higher Alcohols Location: California Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on electro-autotrophic synthesis for use in the production of energy dense, liquid transpcrtatlon fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x - 83.6 SitingJoonstructlonfoperationldecommissioning of facilities for bench-scale research, conventionallaboralory operations, small-scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRlO 21 Click I !ere

259

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Broader source: Energy.gov (indexed) [DOE]

Project T Project T itle: (02 06- 1565) Columbia - Biofue ls from C02 using Amm onia-Oxid izing Bacte ria in a Reve rse Microbi a l Fue l Cell L ocati on: New Y ork Pr oposed Action or Proj ect Description: American Recovery and Reinvestment Act: D Funding will support in-lab R&D activities involving liquid biofuel production from biological-based non-photosynthetic systems. Proposed work consists of (1) initial testing and genetic modification of ammonia-oxidizing and iron-oxidizing bacteria used to produce liquid biofuel and (2) development and optimization of a reverse microbial fuel cel l. All proposed work will take place on the Columbia University campus in New York, NY. Categorical Exciusi on(s) Applied: x - 83.6 Siting/construction/operation/decommissioning of facilities for bench-scale research, conventional laboratory operations, small-scale research and developme

260

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network [OSTI]

large wind power projects, the financing advantage providedestimate how Wind power projects have the advantage of beingall 40 wind power projects, the face value advantage of the

Bolinger, Mark

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program  

SciTech Connect (OSTI)

This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

Watkins, D.R.; Ammons, J.T.; Branson, J.L. [and others

1993-10-01T23:59:59.000Z

262

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

263

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

264

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

265

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

266

Program Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will participate in a wide spectrum of program and project management activities involving systems engineering and integration support for Defense Programs...

267

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

268

Project Listings by State; DOE Hydrogen Program FY 2008 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 FY 2008 Annual Progress Report DOE Hydrogen Program Alabama IV.B.1i University of Alabama: Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .592 V.H.1 CFD Research Corporation: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 V.H.1 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 Alaska II.C.3 University of Alaska: Development of a Novel Efficient Solid-Oxide Hybrid for Co-Generation of Hydrogen and Electricity Using Nearby Resources for Local Application .

269

Project Listings by Organization, DOE Hydrogen Program FY 2010 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

33 33 FY 2010 Annual Progress Report DOE Hydrogen Program 3M Company V.D.2 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .748 V.D.7 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .772 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .790 V.E.6 Durable Catalysts for Fuel Cell Protection during Transient Conditions. . . . . . . . . . . . . . . . . . . . . . . . .825 V.E.8 Nanosegregated Cathode Alloy Catalysts with Ultra-Low Platinum Loading. . . . . . . . . . . . . . . . . . . . .835

270

Project Listings by Organization; DOE Hydrogen Program FY 2008 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2008 Annual Progress Report DOE Hydrogen Program 3M Company V.C.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .861 V.G.5 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .962 V.G.8 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 978 A Mountain Top, LLC X.8 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1275 Addison Bain VIII.6 Hydrogen Safety Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1202

271

Project Listings by Organization; DOE Hydrogen Program FY 2009 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2009 Annual Progress Report DOE Hydrogen Program 3M Company V.D.11 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1034 V.D.13 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1042 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1065 A Mountaintop LLC VII.1 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1267 Acumentrics Corporation V.I.5 Development of a Low Cost 3-10 kW Tubular SOFC Power System . . . . . . . . . . . . . . . . . . . . . . . . . . 1141 Addison Bain IX.7 Hydrogen Safety Panel

272

Project Listings by State, excerpt from DOE Hydrogen Program 2006 Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 9 FY 2006 Annual Progress Report DOE Hydrogen Program Alabama IV.B.4k Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . .429 V.C.5 Development of High-Performance, Low-Pt Cathodes Containing New Catalysts and Layer Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 787 V.F.4 Smart Energy Management of Multiple Fuel Cell Powered Applications . . . . . . . . . . . . . . . . . . . . . . . .862 Arizona II.B.11 Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .83 II.C.8 Zeolite Membrane Based Shift Reactor . . . . . . . . . . . . . . . . .

273

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Broader source: Energy.gov (indexed) [DOE]

Pro Pro ject Title: (02 06-1510) UMass - Electrofu els via Direct Electron Transfer from Electrod es to Microbes" Location: *- Multiple States - California, Massachusetts Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support R&D activities involving microbial electrosynthesis of liquid biofuel and biofu el precursors in in-lab and meso-scale bioreactors. Proposed work consists of increasing liquid biofuel and biofuel precursor production in three target microbes usi ng adaptive evolution, genetic engineering , and metabolic modeling techniques at UMass's research facilities in Amhearst, MA. Proposed work also consists of designing, fabricating, and optimizing three in-lab bioreactors and one meso-scale bioreactor at Genomatica, Inc.

274

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Broader source: Energy.gov (indexed) [DOE]

L L ocation: *- Multiple States - New York, Pennsylvania Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support small-scale laboratory research , design, fabrication and pilot-sca le testing of the Inertial C02 Extraction System (ICES), an aero-thermodynamic inertial separation device for use in carbon capture processes. Funding will also support computationa l and performance modeling, econom ic modeling, and commercialization/transition planning for the IC ES system under development. Proposed work consists of (1) R&D tasks to be completed in laboratory, fabrication and testing facilities located at ATK's GAS L testing and research center in Ronkonkoma, NY, (2) Technical performance modeling and design work at Acent Laboratories in Manorville, NY, and

275

Program or Field Office: Project Title and I. D. No.: Locatio  

Broader source: Energy.gov (indexed) [DOE]

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

276

Program or Field Office: Project Title and I.D. No.:  

Broader source: Energy.gov (indexed) [DOE]

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

277

RECIPIENT:Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program -  

Broader source: Energy.gov (indexed) [DOE]

Nevada State Office of Energy STATE:NV Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program - Enigma Energy TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA"()000052 DE-EE-OOOOO84 GFO-0000084-012 EE84 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the foUowmg determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders. owners, consultants. designers). organizations (such as utilities). and state

278

New England Wind Forum: A Wind Powering America Project - Newsletter #6 - September 2010, (NEWF), Wind and Water Power Program (WWPP)  

Wind Powering America (EERE)

6 - September 2010 6 - September 2010 WIND AND WATER POWER PROGRAM PIX 16204 New England and Northeast Look to the Horizon...and Beyond, for Offshore Wind In early December, Boston hosted the American Wind Energy Association's second annual Offshore Wind Project Workshop. U.S. and European offshore wind stakeholders convened to discuss the emerging U.S. offshore wind industry and provided evidence of a significant increase in activity along the Atlantic Coast from the Carolinas to Maine. The wind power industry and policymakers are looking to offshore for long-term growth, driven by aggressive policy goals, economic develop- ment opportunities, a finite set of attractive land-based wind sites, and immense wind energy potential at a modest distance from major population centers.

279

Nuclear Power 2010 Program Lessons Learned Report on the Combined Construction and Operating License/Design Certification Demonstration Projects  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Power 2010 Program Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report August 30, 2012 Prepared by Longenecker and Associates DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

280

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects  

SciTech Connect (OSTI)

This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

Veselka, T.D.; Folga, S.; Poch, L.A. [and others

1995-03-01T23:59:59.000Z

282

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

283

Federal assistance program. Quarterly project progress report, January 1998--March 1998  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-04-01T23:59:59.000Z

284

Snake River Sockeye Salmon Captive Broodstock Program Research Elements : 2007 Annual Project Progess Report.  

SciTech Connect (OSTI)

On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes (SBT) and Idaho Department of Fish and Game (IDFG) initiated the Snake River Sockeye Salmon Captive Broodstock Program to conserve and rebuild populations in Idaho. Restoration efforts are focused on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced adults occurred in 1993. The first release of juvenile sockeye salmon from the captive broodstock program occurred in 1994. In 1999, the first anadromous adult returns from the captive broodstock program were recorded when six jacks and one jill were captured at the IDFG Sawtooth Fish Hatchery. In 2007, progeny from the captive broodstock program were released using four strategies: (1) eyed-eggs were planted in Pettit Lake in November; (2) age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in October; (3) age-1 smolts were released into Redfish Lake Creek and the upper Salmon River in May; and (4) hatchery-produced adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2007. Population abundances were estimated at 73,702 fish for Redfish Lake, 124,073 fish for Alturas Lake, and 14,746 fish for Pettit Lake. Angler surveys were conducted from May 26 through August 7, 2007 on Redfish Lake to estimate kokanee harvest. On Redfish Lake, we interviewed 102 anglers and estimated that 56 kokanee were harvested. The calculated kokanee catch rate was 0.03 fish/hour for each kokanee kept. The juvenile out-migrant trap on Redfish Lake Creek was operated from April 14 to June 13, 2007. We estimated that 5,280 natural origin and 14,256 hatchery origin sockeye salmon smolts out-migrated from Redfish Lake in 2007. The hatchery origin component originated from a 2006 fall presmolt direct-release. The juvenile out-migrant traps on Alturas Lake Creek and Pettit Lake Creek were operated by the SBT from April 19 to May 23, 2007 and April 18 to May 29, 2007, respectively. The SBT estimated 1,749 natural origin and 4,695 hatchery origin sockeye salmon smolts out-migrated from Pettit Lake and estimated 8,994 natural origin and 6,897 hatchery origin sockeye salmon smolts out-migrated from Alturas Lake in 2007. The hatchery origin component of sockeye salmon out-migrants originated from fall presmolt direct-releases made to Pettit and Alturas lakes in 2006. In 2007, the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC) chose to have all Snake River sockeye salmon juveniles (tagged and untagged) transported due to potential enhanced survival. Therefore, mainstem survival evaluations were only conducted to Lower Granite Dam. Unique PIT tag interrogations from Sawtooth Valley juvenile out-migrant traps to Lower Granite Dam were utilized to estimate survival rates for out-migrating sockeye salmon smolts. Survival rate comparisons were made between smolts originating from Redfish, Alturas, and Pettit lakes and the various release strategies. Alturas Lake hatchery origin smolts tagged at the out-migrant trap recorded the highest survival rate of 78.0%. In 2007, 494 hatchery origin adult sockeye salmon were released to Redfish Lake for natural spawning. We observed 195 areas of excavation in the lake from spawning events. This was the highest number of redds observed in Redfish Lake since the program was initiated. Suspected redds were approximately 3 m x 3 m in size and were constructed by multiple pairs of adults. To monitor the predator population found within the lakes, we monitored bull trout spawning in Fishhook Creek, a tributary to Redfish Lake; and in Alpine Creek, a tributary to Alturas Lake. This represented the tenth consecutive year that the index reaches have been surveyed on these two streams. Adult counts (41 adults) and redd counts (22 redds

Peterson, Mike; Plaster, Kurtis; Redfield, Laura; Heindel, Jeff; Kline, Paul

2008-12-17T23:59:59.000Z

285

Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997--April 1998  

SciTech Connect (OSTI)

This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County.

NONE

1998-07-01T23:59:59.000Z

286

RM Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

include the Fryingpan-Arkansas Project and the Pick-Sloan Missouri Basin Program--Western Division. The projects' marketing and rate-setting functions were integrated in...

287

Sandia National Laboratories: Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The projects below are a few of the projects that IMS is supporting. Advanced Hypersonic Weapon (AHW) The Advanced Hypersonic Weapon (AHW) Program is a technology...

288

Geothermal materials program: strategy. Final report  

SciTech Connect (OSTI)

The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)

Crane, C.H.; Kenkeremath, D.C.

1980-10-01T23:59:59.000Z

289

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

290

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

291

Colorado State University program for developing, testing, evaluating and optimizing solar heating and cooling systems. Project status report, January--February 1992  

SciTech Connect (OSTI)

The objective is to develop and test various integrated solar heating, cooling and domestic hot water systems, and to evaluate their performance. Systems composed of new, as well as previously tested, components are carefully integrated so that effects of new components on system performance can be clearly delineated. The SEAL-DOE program includes six tasks which have received funding for the 1991--92 fifteen-month period. These include: (1) a project employing isothermal operation of air and liquid solar space heating systems, (2) a project to build and test several generic solar water heaters, (3) a project that will evaluate advanced solar domestic hot water components and concepts and integrate them into solar domestic hot water systems, (4) a liquid desiccant cooling system development project, (5) a project that will perform system modeling and analysis work on solid desiccant cooling systems research, and (6) a management task. The objectives and progress in each task are described in this report.

Not Available

1992-03-23T23:59:59.000Z

292

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

293

Weatherization Pilot Projects  

Broader source: Energy.gov [DOE]

Webinars, fact sheets, and other information on Weatherization Assistance Program's Sustainable Energy Resources for Consumers and Weatherization Innovation Pilot Program projects.

294

Using CORE Model-Based Systems Engineering Software to Support Program Management in the U.S. Department of Energy Office of the Biomass Project: Preprint  

SciTech Connect (OSTI)

This paper describes how a model-based systems engineering software, CORE, is helping the U. S. Department of Energy's Office of Biomass Program assist with bringing biomass-derived biofuels to the market. This software tool provides information to guide informed decision-making as biomass-to-biofuels systems are advanced from concept to commercial adoption. It facilitates management and communication of program status by automatically generating custom reports, Gantt charts, and tables using the widely available programs of Microsoft Word, Project and Excel.

Riley, C.; Sandor, D.; Simpkins, P.

2006-11-01T23:59:59.000Z

295

PROJECT RULISON SUMMARY REPORT POST-SHOT A C T I V I T I E S AND. PROGRAMS  

Office of Legacy Management (LM)

SUMMARY REPORT SUMMARY REPORT POST-SHOT A C T I V I T I E S AND. PROGRAMS A p r i l 1 9 7 2 Austral O i l Company Incorporated Houston, Texas TABLE OF CONTENTS I. '-INTRODUCTION 11. LITIGATION 111. RE-ENTRY DRILLING IV. ON-SITE RADIATION MONITORING V. SPECIAL GAS ANALYSES V I . WELL TESTING RESULTS & EVALUATIONS VII . PUBLIC. HEALTH & SAFETY EVAL,UATIONS VIII . HYDROLOGIC EVALUATIONS IX . REFERENCES page Number 1 PROJECT RULISON SUMMARY REPORT POST-SHOT ACTIVITIES AND PROGRAMS I . INTRODUCTION P r o j e c t Rulison was a P l o w s h a r e e x p e r i m e n t t o d e t e r m i n e t h e t e c h n i c a l and economic f e a s i b i l i t y of u s i n g n u c l e a r e x p l o s i v e s t o s t i m u l a t e t h e flow and r e c o v e r y of n a t u r a l g a s f r o m - - t h e Mesa- v e r d e f o r m a t i o n i n t h e Rulison F i e l d , G a r f i e l d C o u n t y , C o l o r a d o . The s u c c e s s f u l d e t o n a t i o n of t

296

DOE/EIS-0265-SA-162: Supplement Analysis for the Watershed Management Program EIS -Libby Creek Lower Cleveland Stabilization Project (07/29/04)  

Broader source: Energy.gov (indexed) [DOE]

29, 2004 29, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-162) Ron Morinaka (KEWU - 4) Fish and Wildlife Project Manager - COTR Proposed Action: Libby Creek (Lower Cleveland) Stabilization Project Project No: 199500400 Watershed Management Program (See App. A : Available Management Techniques): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.9 Structural Bank Protection using Bioengineering Methods; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities. Location: On Libby Creek, located about 18 miles southwest of the town of Libby, Montana

297

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Broader source: Energy.gov (indexed) [DOE]

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

298

DOE/EIS-0265-SA-167: Supplement Analysis for the Watershed Program EIS - Klickitat Watershed Enhancement Project - Klickitat Meadows Restoration (08/09/04)  

Broader source: Energy.gov (indexed) [DOE]

9, 2004 9, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-167) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Klickitat Watershed Enhancement Project - Klickitat Meadows Restoration Project No: 1997-056-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams, 1.6 Install Large Woody Debris Structures, 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.17 Rearing Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 7.18 Road Closures, 8.10 Stream Channel Protection

299

Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1  

SciTech Connect (OSTI)

The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

Not Available

1994-09-01T23:59:59.000Z

300

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Opportunity, risk, and success recognizing, addressing, and balancing multiple factors crucial to the success of a project management system deployed to support multi-lateral decommissioning programs  

SciTech Connect (OSTI)

This paper addresses the factors involved in effectively implementing a world-class program/project management information system funded by multiple nations. Along with many other benefits, investing in and utilizing such systems improves delivery and drive accountability for major expenditures. However, there are an equally large number of impediments to developing and using such systems. To be successful, the process requires a dynamic combining of elements and strategic sequencing of initiatives. While program/project-management systems involve information technologies, software and hardware, they represent only one element of the overall system.. Technology, process, people and knowledge must all be integrated and working in concert with one another to assure a fully capable system. Major system implementations occur infrequently, and frequently miss established targets in relatively small organizations (with the risk increasing with greater complexity). The European Bank of Reconstruction (EBRD) is midway through just such an implementation. The EBRD is using funds from numerous donor countries to sponsor development of an overarching program management system. The system will provide the Russian Federation with the tools to effectively manage prioritizing, planning, and physically decommissioning assets{sub i}n northwest Russia to mitigate risks associated the Soviet era nuclear submarine program. Project-management delivery using world-class techniques supported by aligned systems has been proven to increase the probability of delivering on-time and on-budget, assuring those funding such programs optimum value for money. However, systems deployed to manage multi-laterally funded projects must be developed with appropriate levels of consideration given to unique aspects such as: accommodation of existing project management methods, consideration for differences is management structures and organizational behaviors, incorporation of unique strengths, and subtle adjustment to compensate weaknesses. This paper addresses the architecture and sequencing of implementation. (authors)

Funk, Greg; Longsworth, Paul [Fluor Cumbria, Unit 8, Galemire Court, Westlakes Science Park, Moor Row, CA24 3HY (United Kingdom)

2007-07-01T23:59:59.000Z

302

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network [OSTI]

of the Impact of the Section 1603 Treasury Grant Program onEvaluation of the Section 1603 Treasury Grant Program CieloEvaluation of the Section 1603 Treasury Grant Program

Bolinger, Mark

2012-01-01T23:59:59.000Z

303

Projects | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

304

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

305

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

306

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

307

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

308

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

309

Model program for the recruitment and preparation of high ability elementary mathematics/science teachers: A collaborative project among scientists, teacher educators and classroom teachers  

SciTech Connect (OSTI)

This teacher education program will provide a model for recruiting, educating and retaining high ability students to become mathematics and science lead teachers in elementary schools. The quality experiences and support provided these students will help them develop the knowledge and attitudes necessary to provide leadership for elementary mathematics and science programs. Students will have research experiences at the Ames Laboratory, high quality field experiences with nationally recognized mathematics and science teachers in local schools and opportunities to meaningfully connect these two experiences. This program, collaboratively designed and implemented by scientists, teacher educators and classroom teachers, should provide a replicatable model for other teacher education institutions. In addition, materials developed for the project should help other laboratories interface more effectively with K-8 schools and help other teacher education programs incorporate real science and mathematics experience into their curriculum.

Not Available

1993-12-01T23:59:59.000Z

310

The Integrated Data Base program: An executive-level data base of spent fuel and radioactive waste inventories, projections, and characteristics  

SciTech Connect (OSTI)

The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. As such, it should be as convenient to utilize as is practical. Examples of summary-level tables and figures are presented, as well as more-detailed graphics describing waste-form distribution by site and line charts illustrating historical and projected volume (or mass) changes. This information is readily accessible through the annual IDB publication. Other presentation formats are also available to the DOE community through a simple request to the IDB Program.

Klein, J.A.

1987-01-01T23:59:59.000Z

311

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

312

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

313

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

314

The North American Carbon Program Multi-scale synthesis and Terrestrial Model Intercomparison Project Part 1: Overview and experimental design  

SciTech Connect (OSTI)

Terrestrial biosphere models (TBMs) have become an integral tool for extrapolating local observations and understanding of land-atmosphere carbon exchange to larger regions. The North American Carbon Program (NACP) Multi-scale synthesis and Terrestrial Model Intercomparison Project (MsTMIP) is a formal model intercomparison and evaluation effort focused on improving the diagnosis and attribution of carbon exchange at regional and global scales. MsTMIP builds upon current and past synthesis activities, and has a unique framework designed to isolate, interpret, and inform understanding of how model structural differences impact estimates of carbon uptake and release. Here we provide an overview of the MsTMIP effort and describe how the MsTMIP experimental design enables the assessment and quantification of TBM structural uncertainty. Model structure refers to the types of processes considered (e.g. nutrient cycling, disturbance, lateral transport of carbon), and how these processes are represented (e.g. photosynthetic formulation, temperature sensitivity, respiration) in the models. By prescribing a common experimental protocol with standard spin-up procedures and driver data sets, we isolate any biases and variability in TBM estimates of regional and global carbon budgets resulting from differences in the models themselves (i.e. model structure) and model-specific parameter values. An initial intercomparison of model structural differences is represented using hierarchical cluster diagrams (a.k.a. dendrograms), which highlight similarities and differences in how models account for carbon cycle, vegetation, energy, and nitrogen cycle dynamics. We show that, despite the standardized protocol used to derive initial conditions, models show a high degree of variation for GPP, total living biomass, and total soil carbon, underscoring the influence of differences in model structure and parameterization on model estimates.

Huntzinger, D.N. [Northern Arizona University] [Northern Arizona University; Schwalm, C. [Northern Arizona University] [Northern Arizona University; Michalak, A.M [Carnegie Institution for Science, Stanford] [Carnegie Institution for Science, Stanford; Schaefer, K. [National Snow and Ice Data Center] [National Snow and Ice Data Center; King, A.W. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Wei, Y. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Jacobson, A. [National Snow and Ice Data Center] [National Snow and Ice Data Center; Liu, S. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Cook, R. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Post, W.M. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Berthier, G. [Laboratoire des Sciences du Climat et de l'Environnement (LSCE)] [Laboratoire des Sciences du Climat et de l'Environnement (LSCE); Hayes, D. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Huang, M. [Pacific Northwest National Laboratory (PNNL)] [Pacific Northwest National Laboratory (PNNL); Ito, A. [National Institute for Environmental Studies, Tsukuba, Japan] [National Institute for Environmental Studies, Tsukuba, Japan; Lei, H. [Pacific Northwest National Laboratory (PNNL)] [Pacific Northwest National Laboratory (PNNL); Lu, C. [International Center for Climate and Global Change Research and School of Forestry and Wildlife Sci.] [International Center for Climate and Global Change Research and School of Forestry and Wildlife Sci.; Mao, J. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Peng, C.H. [University of Quebec at Montreal, Institute of Environment Sciences] [University of Quebec at Montreal, Institute of Environment Sciences; Peng, S. [Laboratoire des Sciences du Climat et de l'Environnement (LSCE)] [Laboratoire des Sciences du Climat et de l'Environnement (LSCE); Poulter, B. [Laboratoire des Sciences du Climat et de l'Environnement (LSCE)] [Laboratoire des Sciences du Climat et de l'Environnement (LSCE); Riccuito, D. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Shi, X. [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL); Tian, H. [International Center for Climate and Global Change Research and School of Forestry and Wildlife Sci.] [International Center for Climate and Global Change Research and School of Forestry and Wildlife Sci.; Wang, W. [National Aeronautics and Space Administration (NASA), Ames Research Center, Moffett Field] [National Aeronautics and Space Administration (NASA), Ames Research Center, Moffett Field; Zeng, N. [University of Maryland] [University of Maryland; Zhao, F. [University of Maryland] [University of Maryland; Zhu, Q. [Laboratory for Ecological Forecasting and Northwest Agriculture and Forestry University] [Laboratory for Ecological Forecasting and Northwest Agriculture and Forestry University

2013-01-01T23:59:59.000Z

315

Programming  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu4.6". The "gnu" indicates that it is providing the GNU...

316

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

317

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

318

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

319

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

320

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Jennifer Kurtz (Primary Contact), Keith Wipke, Sam Sprik, Todd Ramsden, Genevieve Saur, and Chris Ainscough National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-4061 Email: jennifer.kurtz@nrel.gov DOE Manager HQ: Sara Dillich Phone: (202) 586-7925 Email: Sara.Dillich@ee.doe.gov Subcontractors: Pacific Northwest National Laboratory, Richland, WA Project Start Date: August 2009 Project End Date: December 2012, with future evaluations covered under DOE's Technology Validation sub-program Objectives Perform an independent assessment of technology in * real-world operation conditions, focusing on fuel cell

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project  

Broader source: Energy.gov (indexed) [DOE]

53 53 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman August 2013 PNNL- 22653 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman Contributors: SGC Panel Members August 2013 Prepared by: Pacific Northwest National Laboratory and

322

Issues related to uncertainty in projections of hazardous and mixed waste volumes in the U.S. Department of Energy`s environmental restoration program  

SciTech Connect (OSTI)

Projected volumes of contaminated media and debris at US Department of Energy (DOE) environmental restoration sites that are potentially subject to the hazardous waste provisions of the Resource Conservation and Recovery Act are needed to support programmatic planning. Such projections have been gathered in various surveys conducted under DOE`s environmental restoration and waste management programs. It is expected that reducing uncertainty in the projections through review of existing site data and process knowledge and through further site characterization will result in substantially lowered projections. If promulgated, the US Environmental Protection Agency`s Hazardous Waste Identification Rule would result in potentially even greater reductions in the projections when site conditions are reviewed under the provisions of the new rule. Reducing uncertainty in projections under current and future waste identification rules may be necessary to support effective remediation planning. Further characterization efforts that may be conducted should be designed to limit uncertainty in identifying volumes of wastes to the extent needed to support alternative selection and to minimize costs of remediation.

Picel, K.C.

1995-03-01T23:59:59.000Z

323

Tanadgusix (TDX) Foundation Hydrogen Project | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tanadgusix (TDX) Foundation Hydrogen Project Tanadgusix (TDX) Foundation Hydrogen Project 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer...

324

Clean Transportation Education Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Transportation Education Project Clean Transportation Education Project 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer...

325

California Hydrogen Infrastructure Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hydrogen Infrastructure Project California Hydrogen Infrastructure Project 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

326

Project Peer Reviews | Department of Energy  

Office of Environmental Management (EM)

Peer Reviews Project Peer Reviews ProjectPeerReviews.pdf More Documents & Publications IndependentPeerReviewProgram.pdf Peer Review EERE Program Management Guide - Appendix D...

327

Development of an EMF Measurements Database, EMF Rapid Program, Project #5, Interim Report: April 1995-December 1996  

SciTech Connect (OSTI)

The EMF measurement data sets in existence today were compiled with varying goals and techniques. Consequently, they have different information content as well as varying logical and physical structure. Future studies will continue to pursue varying goals and utilize techniques that cannot be known in advance. Primary goals for the EMF Measurements Database developed under the Department of Energy EMF RAPID Program are to develop a database structure that can accommodate the diversity of EMF data sets, provide guidance for production of future EMF data sets, and serve as an accessible repository of EMF measurement data. Specific objectives of the EMF Measurements Database are: o to preserve study descriptions, results and data; o to provide readily accessible, well-documented data; and o to facilitate communication among researchers. In addition, the EMF Measurements Database will encourage additional analysis of existing data sets, facilitate analysis of data from multiple projects, support design of new studies, and permit future issues in EMF exposure assessment to be addressed with existing data. Preservation of study descriptions and data is accomplished with a formal, but open, structure. Specifications have been developed for the various elements of the database. Each data set in the database is formally described by a metadata file. The structured metadata file describes the origin, development, logical and physical structure and distribution mechanism for each data set. The metadata for each data set is generated according to a specification developed for the EMF Measurements Database. The actual measurement data is contained in data Products for each data set. The number and type of data product will vary by data set. Most of the data products in the possession of the EMF Measurements Database are available for download from an Internet site. For some data sets, the data products will be maintained by other parties who may have their own access procedures. In addition, data set contributors or users can provide reports that describe results of the study and analysis of the data with text and figures. Guidelines have been developed for preparation of reports. Access to the EMF Measurements Database is provided via an Internet site (http://www.emf-data. erg). The site provides descriptive information in a home page, . . access to data products with a file transfer protocol (ftp) address, and links to other EMF-related sites.

T. Dan Bracken, Inc.

1997-04-01T23:59:59.000Z

328

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

329

This project is sponsored by the Thompson School of Applied ScieThis project is sponsored by the Thompson School of Applied Sciencence''s Community Service & Leadership Program and the Cornucopia Foods Community Service & Leadership Program and the Cornuc  

E-Print Network [OSTI]

by the Thompson School of Applied Sciencence''s Community Service & Leadership Program and the Cornucopia Foods Community Service & Leadership Program and the Cornucopia Food Pantry.Pantry. Be Grateful... Be Great of Cornucopia food pantry andThe 2005 partnership of Cornucopia food pantry and the Community Service

New Hampshire, University of

330

Isotope Program Transportation | Department of Energy  

Office of Environmental Management (EM)

Isotope Program Transportation Isotope Program Transportation Isotope Program Transportation More Documents & Publications Nuclear Fuel Storage and Transportation Planning Project...

331

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

332

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

333

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

334

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

335

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

336

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3  

SciTech Connect (OSTI)

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

Beck Colleen M.,Edwards Susan R.,King Maureen L.

2011-09-01T23:59:59.000Z

337

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3  

SciTech Connect (OSTI)

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

Beck Colleen M,Edwards Susan R.,King Maureen L.

2011-09-01T23:59:59.000Z

338

Magnesium Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Projects Magnesium Projects 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C....

339

Offshore Wind Projects | Department of Energy  

Office of Environmental Management (EM)

Offshore Wind Projects Offshore Wind Projects This report covers the Wind and Water Power Program's offshore wind energy projects from fiscal years 2006 to 2014. Offshore Wind...

340

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network [OSTI]

2010. pp. 17-22. Nevada Geothermal Power. 2010. Faulkner 1both large wind and geothermal power projects. ? Section 3Name Enel Enel Nevada Geothermal Power Raser Total: Capacity

Bolinger, Mark

2012-01-01T23:59:59.000Z

342

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network [OSTI]

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

343

Project Funding | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Funding Project Funding Project Funding Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings. The Federal Energy Management Program (FEMP) supports Federal agencies identify, obtain, and implement project funding for energy projects through: Energy Savings Performance Contracts ESPC ENABLE Process Utility Energy Service Contracts On-Site Renewable Power Purchase Agreements Energy Incentive Programs. Federal agencies can choose the funding options that best fits for their project needs. For an overview of available funding options and strategies, read the FEMP Project Funding Quick Guide.

344

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

345

Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program Projects Involving Residential Weatherization Work  

Broader source: Energy.gov [DOE]

Guidance on using appropriate prevailing wage rates for Davis-Bacon Act (DBA) covered weatherization work performed under the State Energy Program (SEP) using American Recovery and Reinvestment Act of 2009 (ARRA) funds.

346

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

347

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

348

Validation procedures used in the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

The purpose of this report is (1) to document the data validation process developed for the Background Soil Characterization Project (BSCP); (2) to offer members of other project teams and potential data users the benefit of the experience gained in the BSCP in the area of developing project-specific data validation criteria and procedures based on best available guidance and technical information; and (3) to provide input and guidance to the efforts under way within Martin Marietta Energy Systems, Inc., to develop standard operating procedures to streamline and optimize the analytical laboratory data validation process for general use by making it more technically rigorous, consistent, and cost effective. Lessons learned from the BSCP are also provided to meet this end (Sect. 1.3).

Not Available

1993-12-01T23:59:59.000Z

349

Program  

Office of Scientific and Technical Information (OSTI)

Extremophiles 2004 Extremophiles 2004 5th International Conference on Extremophiles SEPTEMBER 19 -23, 2004 CAMBRIDGE, MARYLAND Extremophiles 2004 5th International Conference on Extremophiles © 2004, American Society for Microbiology 1752 N Street, N.W. Washington, DC 20036-2904 Phone: 202-737-3600 World Wide Web: www.asm.org All Rights Reserved Printed in the United States of America ISBN: 1-55581 324-0 TABLE OF CONTENTS General Information Scientific Program Abstracts for Oral Sessions Abstracts for Poster Sessions Index 4 10 18 42 144 4 ASM Conferences EXECUTIVE COMMITTEE Frank Robb, Chair University of Maryland Biotechnology Institute Michael W. Adams University of Georgia Koki Horikoshi Japan Agency for Marine-Earth Science and Technology Robert M. Kelly North Carolina State University Jennifer Littlechild

350

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

351

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

352

Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program  

Broader source: Energy.gov (indexed) [DOE]

Financial Savings Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Prepared By: Yaw O. Agyeman, TMS, Inc. with Jeff Dowd, DOE Office of Energy Efficiency & Renewable Energy Prepared for the Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy October 2008 Acknowledgments: Special thanks go to the following people who provided inputs to the study or review comments on an earlier draft of this paper. * EERE Hydrogen, Fuel Cells and Infrastructure Technologies Program - JoAnn Milliken, Nancy Garland, Sunita Satyapal, Antonio Ruiz, Roxanne Garland, and John Garbak. * Office of Planning, Budget and Analysis - Darrell Beschen and Randy Steer. * National Renewable Energy Laboratory - Neil Snyder and Bill Babiuch.

353

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

354

CER Technology Fellowship Program 2008 Project Team: Cila Herman, Professor, Mechanical Engineering, Whiting School of Engineering, Johns  

E-Print Network [OSTI]

Engineering, Whiting School of Engineering, Johns Hopkins University; Muge Pirtini, Graduate Student, Mechanical Engineering, Whiting School of Engineering Project Title: An Interactive Online Tutorial/C++, WebCT, Digital Audio, Digital Video, Graphic Design, HTML/Web Design, MatLab, PHP, Power

Gray, Jeffrey J.

355

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

356

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

357

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

358

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

359

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

360

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) - BETTER BUILDINGS NEIGHBORHOOD PROGRAM AT GREATER CINCINNATI ENERGY ALLIANCE Project Title: Home Performance with Energy Star and Better Buildings Performance  

SciTech Connect (OSTI)

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organizations investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliances two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

Holzhauser, Andy; Jones, Chris; Faust, Jeremy; Meyer, Chris; Van Divender, Lisa

2013-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Audit Letter Report: OAS-L-07-26 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6 6 Audit Letter Report: OAS-L-07-26 September 28, 2007 Department's Implementation of the Strategic Integrated Procurement Enterprise System - Transition Planning, Interfaces, and Testing The Strategic Integrated Procurement Enterprise System (STRIPES) initiative is an important component of the Department of Energy's (Department or DOE) I-MANAGE program. Consistent with the President's Management Agenda and laws such as the E-Government Act, the STRIPES project has been undertaken to improve the efficiency and effectiveness of awarding and administering acquisition instruments- including managing and operating contracts, interagency and blanket purchase agreements, and purchase and task orders. The initiative will ultimately replace and/or consolidate as

362

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

363

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

364

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

365

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

366

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

367

Project Management Resources | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

368

Clean Coal Technology Demonstration Program: Program Update 2001  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results. Also includes Power Plant Improvement Initiative Projects.

Assistant Secretary for Fossil Energy

2002-07-30T23:59:59.000Z

369

DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK  

Broader source: Energy.gov [DOE]

Guidance on using appropriate prevailing wage rates for all Davis-Bacon Act (DBA) covered-work, including weatherization work, performed under the State Energy (SEP) Program using American Recovery and Reinvestment Act of 2009 (ARRA) funds to ensure compliance with DBA requirements.

370

Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995  

SciTech Connect (OSTI)

The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

NONE

1996-02-01T23:59:59.000Z

371

Supplement Analysis for the Watershed Management Program EIS - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence  

SciTech Connect (OSTI)

The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The proposed fence will meet or exceed BPA's minimum requirement of a 35-foot setback from the stream. Fence posts will be driven into the ground with a post ponder. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing.

N /A

2004-08-04T23:59:59.000Z

372

Modular Pebble-Bed Reactor Project: Laboratory-Directed Research and Development Program FY 2002 Annual Report  

SciTech Connect (OSTI)

This report documents the results of our research in FY-02 on pebble-bed reactor technology under our Laboratory Directed Research and Development (LDRD) project entitled the Modular Pebble-Bed Reactor. The MPBR is an advanced reactor concept that can meet the energy and environmental needs of future generations under DOEs Generation IV initiative. Our work is focused in three areas: neutronics, core design and fuel cycle; reactor safety and thermal hydraulics; and fuel performance.

Petti, David Andrew; Dolan, Thomas James; Miller, Gregory Kent; Moore, Richard Leroy; Terry, William Knox; Ougouag, Abderrafi Mohammed-El-Ami; Oh, Chang H; Gougar, Hans D

2002-11-01T23:59:59.000Z

373

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

374

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

375

Plutonium Consumption Program, CANDU Reactor Project: Feasibility of BNFP Site as MOX Fuel Supply Facility. Final report  

SciTech Connect (OSTI)

An evaluation was made of the technical feasibility, cost, and schedule for converting the existing unused Barnwell Nuclear Fuel Facility (BNFP) into a Mixed Oxide (MOX) CANDU fuel fabrication plant for disposition of excess weapons plutonium. This MOX fuel would be transported to Ontario where it would generate electricity in the Bruce CANDU reactors. Because CANDU MOX fuel operates at lower thermal load than natural uranium fuel, the MOX program can be licensed by AECB within 4.5 years, and actual Pu disposition in the Bruce reactors can begin in 2001. Ontario Hydro will have to be involved in the entire program. Cost is compared between BNFP and FMEF at Hanford for converting to a CANDU MOX facility.

NONE

1995-06-30T23:59:59.000Z

376

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

SciTech Connect (OSTI)

Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

Grace, R. C.; Gifford, J.

2010-01-01T23:59:59.000Z

377

Site surveillance and maintenance program for Palos Park, report for 1985. [Part of Manhattan Engineering District project  

SciTech Connect (OSTI)

The results of the environmental monitoring program conducted at Site A/Plot M in the Palos Park area for CY 1985 are presented. The monitoring program is the ongoing remedial action that resulted from the radiological characterization of the site. The current program consists of sample collection and analysis of air, surface and subsurface water, and bottom sediment to determine the migration pathway of water from the burial ground (Plot M) to the wells, establish if other buried radionuclides have migrated, and otherwise characterize the radiological environment of the area. Earlier studies had determined that hydrogen-3 (as tritiated water) migrated from the burial ground and was detected in two nearby hand-pumped picnic wells. Hydrogen-3 in the Red Gate Woods picnic well continued to show the same pattern of elevated levels in the winter and low concentrations in the summer, but the magnitude of the winter peak (2.5 nCi/L) was significantly less than in earlier years. Tritiated water continues to be monitored at a number of wells, boreholes, and surface streams where it has been detected in the past. For many years it was the only radionuclide found to have migrated until recent measurements indicated the presence of strontium-90 in borehole water next to Plot M. The presence of the strontium-90 is an indicator of migration of radionuclides other than tritiated water from the Plot. However, the results of the program indicates that the radioactivity remaining at Site A/Plot M does not endanger the health or safety of the public visiting the site or those living in the vicinity.

Golchert, N.W.; Sedlet, J.

1986-04-01T23:59:59.000Z

378

Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994  

SciTech Connect (OSTI)

The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

Not Available

1994-12-31T23:59:59.000Z

379

Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

Lienau, P.

1996-11-01T23:59:59.000Z

380

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

382

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

383

Federal Funding for State and Local Clean Energy Programs  

Broader source: Energy.gov [DOE]

Federal programs that provide funding to state and local governments for clean energy programs and projects.

384

Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998  

SciTech Connect (OSTI)

This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

NONE

1998-07-01T23:59:59.000Z

385

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

386

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

387

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

388

NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669  

SciTech Connect (OSTI)

The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

Not Available

1992-08-01T23:59:59.000Z

389

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

390

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

391

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

392

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

393

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

394

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

395

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

396

Renewable Project Overview  

Broader source: Energy.gov (indexed) [DOE]

Project Overview Project Overview Federal Utility Partnership Working Group 5/6/09 Chandra Shah, NREL 303-384-7557, chandra.shah@nrel.gov National Renewable Energy Laboratory Innovation for Our Energy Future Presentation Overview Federal and utility renewable requirements Power Purchase Agreements (PPA) Western Area Power Administration Federal Renewable Program UESC and renewables * Participating in utility renewable programs - Opportunity Announcement process Renewable projects implemented using appropriations National Renewable Energy Laboratory Innovation for Our Energy Future Biomass Resource

397

Supplement Analysis for the Watershed Management Program EIS and the Hood River Fisheries Project Final EIS(DOE/EIS-0241) (DOE/EIS-0265/SA-62) (9/14/01)  

Broader source: Energy.gov (indexed) [DOE]

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-62) and the Hood River Fisheries Project Final EIS (DOE/EIS-0241). Thomas Morse Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat Project Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.16 and 1.17 Spawning and rearing habitat enhancements; 2.1 Maintain healthy riparian plant communities; 4.9 Water conveyance: ditch and canal lining; 4.23 Intake and return diversion screens; 1.13 Culvert removal and replacement. Location: Odell, Hood River County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Warms

398

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

399

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

400

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

402

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

403

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

404

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

405

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

406

Case study of the Wendel-Amedee Exploration Drilling Project, Lassen County, California, User Coupled Confirmation Drilling Program  

SciTech Connect (OSTI)

The Wendel-Amedee KGRA is located in Honey Lake basin in Lassen County, California, on the boundary between the Modoc Plateau and the Basin and Range geologic provinces. A variety of geophysical surveys was performed over the project property. Geophysical data helped in establishing the regional structural framework, however, none of the geophysical data is sufficiently refined to be considered suitable for the purpose of siting an exploration drill hole. Drilling of reservoir confirmation well WEN-1 took place from August 1 to September 22, 1981. Pulse and long-term flow testing subjected the reservoir to a maximum flow of 680 gpm for 75 hours. At that rate, the well exhibited a productivity index of 21.6 gpm/psi; the reservoir transmissivity was 3.5 x 10/sup 6/ md-ft/cp. The maximum bottom-hole temperature recorded during testing was 251/sup 0/F. The conceptual model of the geothermal resource at Wendel Hot Springs calls on ground water, originating in the neighboring volcanic highlands, descending through jointed and otherwise permeable rocks into the granitic basement. Once in the basement, the fluid is heated as it continues its descent, and lateral movement as dictated by the hydrologic gradient. It then rises to the discharge point along transmissive faults. 45 refs., 28 figs., 3 tabs.

Zeisloft, J.; Sibbett, B.S.; Adams, M.C.

1984-09-01T23:59:59.000Z

407

Puget Sound Clean Cities Petroleum Reduction Project | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Puget Sound Clean Cities Petroleum Reduction Project Puget Sound Clean Cities Petroleum Reduction Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program...

408

Puget Sound Clean Cities Petroleum Reduction Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

Puget Sound Clean Cities Petroleum Reduction Project Puget Sound Clean Cities Petroleum Reduction Project 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program...

409

SANBAG - Ryder Natural Gas Vehicle Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

SANBAG - Ryder Natural Gas Vehicle Project SANBAG - Ryder Natural Gas Vehicle Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review...

410

SANBAG - Ryder Natural Gas Vehicle Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

SANBAG - Ryder Natural Gas Vehicle Project SANBAG - Ryder Natural Gas Vehicle Project 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review...

411

Nuclear Fuels Storage and Transportation Planning Project (NFST...  

Office of Environmental Management (EM)

Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Presentation made by...

412

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Texas Propane Vehicle Pilot Project Texas Propane Vehicle Pilot Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

413

Program Overview  

Broader source: Energy.gov [DOE]

The culture of the DOE community will be based on standards. Technical standards will formally integrate part of all DOE facility, program and project activities. The DOE will be recognized as a...

414

Clean Coal Technology Demonstration Program: Program Update 1998  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

1999-03-01T23:59:59.000Z

415

Clean Coal Technology Demonstration Program: Program Update 1999  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2000-04-01T23:59:59.000Z

416

Clean Coal Technology Demonstration Program: Program Update 2000  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2001-04-01T23:59:59.000Z

417

Carbon Sequestration Project Portfolio  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home > Technologies > Carbon Storage > Reference Shelf > Project Portfolio Home > Technologies > Carbon Storage > Reference Shelf > Project Portfolio Carbon Storage 2011 Carbon Storage Project Portfolio Table of Contents CARBON STORAGE OVERVIEW Carbon Storage Program Contacts [PDF-26KB] Carbon Storage Projects National Map [PDF-169KB] State Projects Summary Table [PDF-39KB] Carbon Storage Program Structure [PDF-181KB] Selected Carbon Sequestration Program Papers and Publications The U.S. Department of Energy's R&D Program to Reduce Greenhouse Gas Emissions Through Beneficial Uses of Carbon Dioxide (2011) [PDF-3.3MB] Greenhouse Gas Science and Technology Carbon Capture and Sequestration: The U.S. Department of Energy's R&D Efforts to Characterize Opportunities for Deep Geologic Storage of Carbon Dioxide in Offshore Resources (2011) [PDF-445KB]

418

IT Project Management Certification | Department of Energy  

Office of Environmental Management (EM)

and research project management certification initiatives and services provided by NASA, USDA, DOJ, HUD, GSA (STAR program), OPM, Federal CIO Council, Project Management...

419

Independent Oversight Inspection, Idaho Cleanup Project - August...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Idaho Cleanup Project - August 2007 August 2007 Inspection of Environment, Safety, and Health Programs at the Idaho Cleanup Project This report provides the...

420

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

422

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

423

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

424

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

425

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

426

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

427

Project Name/Description  

Broader source: Energy.gov (indexed) [DOE]

RCA CM-3 Risk Management RCA CM-3 Risk Management Projects/Programs - RMPs, Tools, and SMEs Project Name/Description (see note below) DOE Program DOE RMP Contractor RMP Combined RMP Tools Database/Risk Analysis SMEs Federal/M&O/Consultant Integrated Biorefinery Research Facility Project EE X Research Support Facility Project EE X National Synchrotron Light Source II Project SC X 12 GeV Upgrade Project (TJL) SC X Physical Sciences Facility Project (PNNL) SC X P6, Pertmaster, Excel Mike Shay, Jason Gatelum ITER SC X (internation al pgm) P6, Pertmaster, Risk Checklist, Risk Assessor Handbook John Tapia, Colin Williams, Allen Bishop SING & SING II (SNS, OR) SC X Excel, Analytic Hierarchy, P6 Barbara Thibadeau Modernization of Lab Fac. (ORNL)

428

Environmental Management (EM) Cleanup Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

2008-09-24T23:59:59.000Z

429

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

430

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

431

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

432

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

433

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

434

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

435

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

436

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

437

Automotive Waste Heat Conversion to Power Program  

Broader source: Energy.gov (indexed) [DOE]

or otherwise restricted information Project ID ace47lagrandeur Automotive Waste Heat Conversion to Power Program- 2009 Hydrogen Program and Vehicle Technologies Program...

438

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

439

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

440

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

442

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

443

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

444

CALIFORNIA ENERGY Project Brochures  

E-Print Network [OSTI]

the integrated design, construction, and operation of building systems. The Integrated Energy SystemsCALIFORNIA ENERGY COMMISSION Project Brochures Integrated Energy Systems: Productivity and Building of a larger research effort called Integrated Energy Systems: Productivity and Building Science Program

445

INTERNSHIPS SPECIAL PROJECTS  

E-Print Network [OSTI]

. The five academic programs within CAUSES ­ architecture, environmental science, health education, nursing%), architecture (24%), dietetics & nutrition science (20%), and environmental scientists (20%). These projections PUBLIC HEALTH ENVIRONMENTAL SCIENCE CAUSES invites you to apply for SUMMER SEMESTER INTERNSHIPS through

District of Columbia, University of the

446

Navajo Electrification Demonstraiton Project  

SciTech Connect (OSTI)

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

447

About the Uniform Methods Project  

Office of Energy Efficiency and Renewable Energy (EERE)

The Uniform Methods Project is developing Methods for Determining Energy Efficiency Savings for Specific Measures through collaboration with energy efficiency program administrators, stakeholders,...

448

Uniform Methods Project Related Links  

Office of Energy Efficiency and Renewable Energy (EERE)

The websites and publications listed below provide supporting information for theUniform Methods Project and for evaluation, measurement, and verification (EM&V) of energy efficiency programs.

449

About the Uniform Methods Project  

Office of Energy Efficiency and Renewable Energy (EERE)

The Uniform Methods Project is developing measurement and verification protocols for determining energy savings for commonly implemented program measures. This work is being done through...

450

major-projects | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Major Gasification Projects News Gasifipedia Gasifier Optimization Feed Systems Syngas Processing Systems Analyses Gasification Plant Databases International Activity Program Plan...

451

Big Island Demonstration Project Black Liquor  

Broader source: Energy.gov [DOE]

This fact sheet summarizes a U.S. Department of Energy Biomass Program research and development project.

452

Past SunShot Incubator Projects  

Broader source: Energy.gov [DOE]

Projects funded under the SunShot Initiative solar energy Incubator Program yielded technical breakthroughs and insights.

453

Acquisition and Project Management Continuous Improvement Presentation...  

Office of Environmental Management (EM)

Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project Management Continuous...

454

Enterprise Assessments Review, West Valley Demonstration Project December 2014  

Broader source: Energy.gov [DOE]

Review of the West Valley Demonstration Project Emergency Management Program Technical Basis and Emergency Preparedness

455

Desert Peak EGS Project  

Broader source: Energy.gov [DOE]

Geothermal Technologies Program 2010 Peer Review Desert Peak EGS Project, for the Engineered Geothermal Systems Demonstration Projects and Innovative Exploration Technologies. Objective to stimulate permeability in tight well 27-15 and improve connection to rest of the field; improve overall productivity or injectivity. Successful stimulation yields more production and enables more power generation.

456

World Climate Research Programme (WCRP) Coupled Model Intercomparison Project phase 3 (CMIP3): Multi-Model Dataset Archive at PCMDI (Program for Climate Model Diagnosis and Intercomparison)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

In response to a proposed activity of the WCRP's Working Group on Coupled Modelling (WGCM),PCMDI volunteered to collect model output contributed by leading modeling centers around the world. Climate model output from simulations of the past, present and future climate was collected by PCMDI mostly during the years 2005 and 2006, and this archived data constitutes phase 3 of the Coupled Model Intercomparison Project (CMIP3). In part, the WGCM organized this activity to enable those outside the major modeling centers to perform research of relevance to climate scientists preparing the Fourth Asssessment Report (AR4) of the Intergovernmental Panel on Climate Change (IPCC). The IPCC was established by the World Meteorological Organization and the United Nations Environmental Program to assess scientific information on climate change. The IPCC publishes reports that summarize the state of the science. This unprecedented collection of recent model output is officially known as the WCRP CMIP3 multi-model dataset. It is meant to serve IPCC's Working Group 1, which focuses on the physical climate system - atmosphere, land surface, ocean and sea ice - and the choice of variables archived at the PCMDI reflects this focus. A more comprehensive set of output for a given model may be available from the modeling center that produced it. As of November 2007, over 35 terabytes of data were in the archive and over 303 terabytes of data had been downloaded among the more than 1200 registered users. Over 250 journal articles, based at least in part on the dataset, have been published or have been accepted for peer-reviewed publication. Countries from which models have been gathered include Australia, Canada, China, France, Germany and Korea, Italy, Japan, Norway, Russia, Great Britain and the United States. Models, variables, and documentation are collected and stored. Check http://www-pcmdi.llnl.gov/ipcc/data_status_tables.htm to see at a glance the output that is available. (Description taken from http://www-pcmdi.llnl.gov/ipcc/about_ipcc.php)

457

Clean Coal Technology Programs: Program Update 2003 (Volume 1)  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2003-12-01T23:59:59.000Z

458

Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program, May 2012  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

459

Accelerating projects  

SciTech Connect (OSTI)

This chapter describes work at ORNL in the period around 1950, when the laboratory was evolving from its original mission of research aimed at producing the atomic bomb, to a new mission, which in many ways was unclear. The research division from Y-12 merged with the laboratory, which gave an increased work force, access to a wide array of equipment, and the opportunity to work on a number of projects related to nuclear propulsion. The first major project was for a nuclear aircraft. From work on this program, a good share of the laboratories work in peaceful application of nuclear energy would spring. A major concern was the development of light weight shielding to protect the crew and materials in such a plane. To do such shielding work, the laboratory employed existing, and new reactors. The original plans called for the transfer of reactor work to Argonne, but because of their own research load, and the needs of the lab, new reactor projects were started at the lab. They included the Low Intensity Test Reactor, the Swimming Pool Reactor, the Bulk Shielding Reactor, the Tower Shielding Facility, and others. The laboratory was able to extend early work on calutrons to accelerator development, pursuing both electrostatic accelerators and cyclotrons. The aircraft project also drove the need for immense quantities of scientific data, with rapid analysis, which resulted the development of divisions aimed at information support and calculational support. The laboratory also expanded its work in the effects of radiation and cells and biological systems, as well as in health physics.

Not Available

1992-01-01T23:59:59.000Z

460

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Renewable Energy Project Funding | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Project Funding Renewable Energy Project Funding Renewable Energy Project Funding October 16, 2013 - 5:15pm Addthis Renewable Energy Project Funding Planning, Programming & Budgeting Building Design Project Construction Commissioning Operations & Maintenance Federal energy projects require funding to generate results. Agencies trying to stretch their capital budget for a construction project should investigate renewable energy project funding options outside the traditional appropriated budget process. Carefully matching available funding tools with specific project needs can make the difference between a stalled, unfunded renewable energy project and a successful project that generates energy and cost savings. Federal agencies may be able to use tools to finance renewable energy

462

Sequestration Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NETL's NETL's Carbon Capture and Sequestration Program Advances of Multi-pollutant and CO 2 Control Technologies Chicago, IL April 30, 2007 Timothy Fout Project Manager National Energy Technology Laboratory T. Fout, Apr. 2007 Outline for Presentation * NETL Overview * The Issue * The Solutions * What is Carbon Capture and Storage (CCS) * DOE's Sequestration Program Structure * CO 2 Capture Research Projects T. Fout, Apr. 2007 National Energy Technology Laboratory * Only DOE national lab dedicated to fossil energy - Fossil fuels provide 85% of U.S. energy supply * One lab, five locations, one management structure * 1,100 Federal and support-contractor employees * Research spans fundamental science to technology demonstrations West Virginia

463

Beowawe Bottoming Binary Project Geothermal Project | Open Energy  

Open Energy Info (EERE)

Beowawe Bottoming Binary Project Geothermal Project Beowawe Bottoming Binary Project Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Beowawe Bottoming Binary Project Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and Geopressured Resources Project Type / Topic 3 Low Temperature Resources Project Description The proposed two-year project supports the DOE GTP's goal of promoting the development and commercial application of energy production from low-temperature geothermal fluids, i.e., between 150°F and 300°F. State Nevada Objectives Demonstrate the technical and economic feasibility of electricity generation from nonconventional geothermal resources of 205°F using the first commercial use of a cycle at a geothermal power plant inlet temperature of less than 300°F.

464

Project Management Business Process Project Delivery Processes Includes VE Budget  

E-Print Network [OSTI]

Project Management Business Process Project Delivery Processes Includes VE Budget Schedule Activities that do/could feed into PMBP LEGEND VE Cost Avoidance Program Coverage Document Results (Before, could use the value methodology to facilitate after action review. The project manager is responsible

US Army Corps of Engineers

465

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

SciTech Connect (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

466

Deere & Company Energy Management Program  

E-Print Network [OSTI]

An overview of the Deere & Company Energy Management Program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

Darby, D. F.

1981-01-01T23:59:59.000Z

467

Project ID _________________ OSP October 2010  

E-Print Network [OSTI]

· Office for Sponsored Programs 90 Days BEFORE Project End Date Determine if no-cost extension is needed Review project budget Confirm accuracy of all expenses Prevent cost overruns Review and close fringe and F&A allocations Submit cost transfer requests, if needed Review reporting due dates AT Project

Huang, Jianyu

468

Project 350  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gas Hydrates Gas Hydrates CONTACTS Ray Boswell Acting Technology Manager Gas Technology Management Division 304-285-4541 ray.boswell@netl.doe.gov James Ammer Director Gas Technology Management Division 304-285-4383 james.ammer@netl.doe.gov Kelly Rose Project Manager Gas Technology Management Division 304-285-4157 kelly.rose@netl.doe.gov Joseph Wilder Research Group Leader Simulation, Analysis and Computational Science Division 304-285-0989 joseph.wilder@netl.doe.gov NETL - DIRECTING THE DEVELOPMENT OF WORLD-CLASS GAS HYDRATE RESERVOIR SIMULATORS Development of reliable simulators that accurately predict the behavior methane hydrates in nature is a critical component of NETL's program to appraise the gas supply potential of hydrates. NETL is leading the development of a suite of modeling tools that are providing

469

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

470

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

fluid-driven fracture fluid-driven fracture DE-FE0002020 Joseph F. Labuz Civil Engineering University of Minnesota U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits statement * Goal, objectives * Technical status: fracture code, experimental results (poro, AE) * Accomplishments * Summary 0 50 100 150 200 250 300 350 0.00 0.05 0.10 0.15 0.20 Lateral displacement [mm] Load [kN] 0 300 600 900 1200 1500 AE events inelastic deformation peak 3 Benefit to the Program * Goal: develop technologies to predict CO2 storage capacity in geologic formations. * Benefits statement: develop 3D boundary element code & experimental techniques

471

Silver Peak Innovative Exploration Project  

Broader source: Energy.gov [DOE]

DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

472

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

473

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

474

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

475

SRS - Programs - Nonproliferation Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/2012 3/2012 SEARCH GO spacer SRS Home Nonproliferation Programs In the crucial field of nuclear nonproliferation, SRS employee contributions helped to advance all three of the planned plutonium disposition facilities at the Savannah River Site: the Pit Disassembly and Conversion Facility (PDCF); Waste Solidification Building (WSB); and the Mixed Oxide (MOX) Fuel Fabrication Facility. A $345 million project, the WSB will process liquid waste from the MOX facility. After material is processed at the WSB, transuranic waste will be packaged and sent to the Waste Isolation Pilot Plant in New Mexico, and low-level waste will be packaged and sent to onsite or commercial off-site low-level waste disposal facilities. The mixed oxide fuel fabrication facility will be a major component in the United States' program to dispose of excess weapons grade plutonium.

476

Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program  

Office of Energy Efficiency and Renewable Energy (EERE)

Results of a study to assess the financial savings to the Department of Energys (DOE) Hydrogen Program due to decisions made from peer reviews.

477

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

478

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Michael Lane

2012-01-01T23:59:59.000Z

479

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

480

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

Note: This page contains sample records for the topic "imanage program project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

482

Project Execution Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

483

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book), Large-Scale Renewable Energy Guide, Federal Energy Management Program (FEMP)  

Broader source: Energy.gov (indexed) [DOE]

LARGE-SCALE RENEWABLE ENERGY GUIDE LARGE-SCALE RENEWABLE ENERGY GUIDE Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities A Practical Guide to Getting Large-Scale Renewable Energy Projects Financed with Private Capital Cover photos, clockwise from the top: Installing mirrored parabolic trough collectors - (January 19, 2012) Crews work around the clock installing mirrored parabolic trough collectors, built on site, that will cover 3 square miles at Abengoa's Solana Plant. Solana a 280 megawatt utility scale solar power plant (CSP) under construction in Gila Bend, Arizona, USA. When finished it will generate 280 MW 's of clean, sustainable power serving over 70,000 Arizona homes. Photo by Dennis Schroeder, NREL 20097 Dry Lake Wind Power Project in Arizona; Suzlon S88 wind turbines - The 63-MW Dry Lake Wind Power Project in Arizona is the first

484

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book), Large-Scale Renewable Energy Guide, Federal Energy Management Program (FEMP)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LARGE-SCALE RENEWABLE ENERGY GUIDE LARGE-SCALE RENEWABLE ENERGY GUIDE Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities A Practical Guide to Getting Large-Scale Renewable Energy Projects Financed with Private Capital Cover photos, clockwise from the top: Installing mirrored parabolic trough collectors - (January 19, 2012) Crews work around the clock installing mirrored parabolic trough collectors, built on site, that will cover 3 square miles at Abengoa's Solana Plant. Solana a 280 megawatt utility scale solar power plant (CSP) under construction in Gila Bend, Arizona, USA. When finished it will generate 280 MW 's of clean, sustainable power serving over 70,000 Arizona homes. Photo by Dennis Schroeder, NREL 20097 Dry Lake Wind Power Project in Arizona; Suzlon S88 wind turbines - The 63-MW Dry Lake Wind Power Project in Arizona is the first

485

Principal Inves.gator Donor COLLEGE Project/Research AMOUNT Wayne He Luke Charitable Founda5on Arts & Sciences Chinese Language Flagship Program $10,000  

E-Print Network [OSTI]

Principal Inves.gator Donor COLLEGE Project/Research AMOUNT Wayne He Luke Charitable Founda Received For the Year-Ending June 30, 2012 1 7.1 #12;Principal Inves.gator Donor COLLEGE

Rhode Island, University of

486

Stopping the emergence of nuclear weapon states in the Third World: An examination of the Iraq weapons inspection program. Study project  

SciTech Connect (OSTI)

The end of the Gulf War and the implementation of United Nation (UN) resolutions uncovered an Iraqi multi-billion dollar nuclear weapons program. Iraq's ability to pursue this clandestine program for more than a decade, despite periodic inspections, suggest that the myriad of treaties and agreements designed to curb proliferation may be inadequate. Clearly more must be done to deter and counter the spread of these deadly weapon. The UN weapons inspections in Iraq provide insight into possible solutions to the proliferation of nuclear weapons technology in the developing world. This study examines the policy and operational aspects associated with an intrusive United Nations inspection program. In its final analysis, this paper suggests that an effective challenge inspection program is a necessary element in countering the spread of weapons of mass destruction. Further, it suggests that the UN, as the only internationally accepted enforcement organization, be fully engaged in nonproliferation issues and support the challenge inspection program.

Block, D.A.

1993-01-31T23:59:59.000Z

487

Categorical Exclusion 4564, Sort and Segregation Facility  

Broader source: Energy.gov (indexed) [DOE]

Fornl Fornl Project Title: Sort and Segregation Facility (4564) Program or Program Office: Y-12 Site Office Location: Oak Ridge Tennessee Project Description: This work scope will revamp a Rubb Tent or the sorting and segregation of waste material. Initial containers to be segregated will be midsize boxes containing material from a process facility. The boxes contains Holden Furnaces that have been used as salt baths. General AdministrationIManagement OA I - Routine business actions OA2 - Administrative contract amendments OA4 - Interpretations/rulings for existing regulations OA5 - Regulatory interpretations without environmental effect OA6 Procedural rulemakings upgrade OA 7 - Transfer of property, use unchanged OA8 - Award of technical supportlM&O/personal service contracts

488

Independent Oversight Review, West Valley Demonstration Project  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review, West Valley Demonstration Project Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) in September 2000.

489

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

490

Project Management in NASA Mars Climate Orbiter  

E-Print Network [OSTI]

Report on Project Management in NASA by the Mars Climate Orbiter Mishap Investigation Board March Acknowledgements 5 Executive Summary 6 1. Introduction 10 2. The Mars Climate Orbiter Mission: Observations and Lessons Learned 15 3. A New Vision for NASA Programs and Projects 24 4. NASA's Current Program/Project

Rhoads, James

491

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

492

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

493

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

494

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

</