1

Toms Creek IGCC Demonstration Project  

SciTech Connect

The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

Virr, M.J.

1992-11-01T23:59:59.000Z

2

Toms Creek IGCC Demonstration Project  

SciTech Connect

The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

Virr, M.J.

1992-01-01T23:59:59.000Z

3

Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994  

SciTech Connect

This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

NONE

1995-05-01T23:59:59.000Z

4

PINON PINE: An advanced IGCC demonstration  

SciTech Connect

The Pinon Pine Power Project is a second generation integrated gasification combined cycle (IGCC) power plant, located at Sierra Pacific Power Company`s (SPPC) Tracy Station, 17 miles east of Reno, Nevada. The project is being partially funded under the Department of Energy`s (DOE`s) Clean Coal Technology Program (CCT). SPPC intends to operate the plant in base-load mode to supply approximately 100 megawatts electric (MWe) to the transmission grid. This plant will be the first full-scale integration of several advanced technologies: an air-blown KRW gasifier; full-stream hot gas desulfurization using a transport reactor system with a zinc-based sorbent; full-stream, high-temperature ceramic filters for particulate removal; the General Electric Model MS6001FA (617A) Gas Turbine Engine/generator, and a 950 pound per square inch absolute (psia), 950{degrees}F steam turbine generator. This paper reviews the overall configuration and integration of the gasification and power islands components, which yield the plant`s high efficiency. Current status of the project is addressed.

Freier, M.D.; Jewell, D.M. [Morgantown Energy Technology Center, WV (United States); Motter, J.W. [Sierra Pacific Power Co., Reno, NV (United States)

1996-04-01T23:59:59.000Z

5

The role of IGCC in USDOE clean coal research, development and demonstration  

SciTech Connect

For many years, the US Department of Energy (DOE) has been funding research, development, and demonstration (RD&D) projects to develop advanced power generation technologies. The goal of this RD&D is private sector commercialization of technologies that will provide reasonably priced electricity and still meet stringent environmental standards. Integrated Gasification Combined-Cycle (IGCC) systems are emerging as one of the more attractive candidate technologies to meet this goal. The Morgantown Energy Technology Center (METC) has been assigned the responsibility for implementing IGCC projects in DOE`s Clean Coal RD&D program. Projects related to IGCC are briefly described.

Schmidt, D.K.; Rath, L.K.

1993-09-01T23:59:59.000Z

6

Combustion Engineering IGCC Repowering Project  

SciTech Connect

C-E gasification process uses an entrained-flow, two-stage, slagging bottom gasifier. Figure 1 shows a schematic of the gasifier concept. Some of the coal and all of the char is fed to the combustor section, while the remaining coal is fed to the reducter section of the gasifier. The coal and char in the combustor is mixed with air and the fuel-rich mixture is burned creating the high temperature necessary to gasify the coal and melt the mineral matter in the coal. The slag flows through a slag tap at the bottom of the combustor into a water-filled slag tank where it is quenched and transformed into an inert, glassy, granular material. This vitrified slag is non-leaching, making it easy to dispose of in an environmentally acceptable manner. The hot gas leaving the combustor enters the second stage called the reductor. In the reducter, the char gasification occurs along the length of the reductor zone until the temperature falls to a point where the gasification kinetics become too slow. Once the gas temperature reaches this level, essentially no further gasification takes place and the gases subsequently are cooled with convective surface to a temperature low enough to enter the cleanup system. Nearly all of the liberated energy from the coal that does not produce fuel gas is collected and recovered with steam generating surface either in the walls of the vessel or by conventional boiler convective surfaces in the backpass of the gasifier. A mixture of unburned carbon and ash (called char) is carried out of the gasifier with the product gas strewn. The char is collected and recycled back to the gasifier where it is consumed. Thus, there is no net production of char which results in negligible carbon loss. The product gas enters a desulfurization system where it is cleaned of sulfur compounds present in the fuel gas. The clean fuel gas is now available for use in the gas turbine combuster for an integrated coal gasification combined cycle (IGCC) application.

Andrus, H.E.; Thibeault, P.R.; Gibson, C.R.

1992-11-01T23:59:59.000Z

7

Combustion Engineering IGCC Repowering Project  

SciTech Connect

C-E gasification process uses an entrained-flow, two-stage, slagging bottom gasifier. Figure 1 shows a schematic of the gasifier concept. Some of the coal and all of the char is fed to the combustor section, while the remaining coal is fed to the reducter section of the gasifier. The coal and char in the combustor is mixed with air and the fuel-rich mixture is burned creating the high temperature necessary to gasify the coal and melt the mineral matter in the coal. The slag flows through a slag tap at the bottom of the combustor into a water-filled slag tank where it is quenched and transformed into an inert, glassy, granular material. This vitrified slag is non-leaching, making it easy to dispose of in an environmentally acceptable manner. The hot gas leaving the combustor enters the second stage called the reductor. In the reducter, the char gasification occurs along the length of the reductor zone until the temperature falls to a point where the gasification kinetics become too slow. Once the gas temperature reaches this level, essentially no further gasification takes place and the gases subsequently are cooled with convective surface to a temperature low enough to enter the cleanup system. Nearly all of the liberated energy from the coal that does not produce fuel gas is collected and recovered with steam generating surface either in the walls of the vessel or by conventional boiler convective surfaces in the backpass of the gasifier. A mixture of unburned carbon and ash (called char) is carried out of the gasifier with the product gas strewn. The char is collected and recycled back to the gasifier where it is consumed. Thus, there is no net production of char which results in negligible carbon loss. The product gas enters a desulfurization system where it is cleaned of sulfur compounds present in the fuel gas. The clean fuel gas is now available for use in the gas turbine combuster for an integrated coal gasification combined cycle (IGCC) application.

Andrus, H.E.; Thibeault, P.R.; Gibson, C.R.

1992-01-01T23:59:59.000Z

8

IGCC demonstration plant at Nakoso Power Station, Japan  

Science Conference Proceedings (OSTI)

The 250 MW IGCC demonstration plant at Nakoso Power Station is based on technology form Mitsubishi Heavy Industries (MHI) Ltd that uses a pressurized, air blown, two-stage, entrained-bed coal gasifier with a dry coal feed system. 5 figs., 1 tab.

Peltier, R.

2007-10-15T23:59:59.000Z

9

Demonstration plant for IGCC using the U-GAS process  

SciTech Connect

Tampella, Ltd., in cooperation with the Institute of Gas Technology (IGT), is developing the gasification technology for U-GAS{reg_sign} to produce electricity from coal using the integrated gasification combined-cycle (IGCC). The concept of IGCC is to join the clean burning gasification island with a more efficient gas and stream turbine island to produce electric power with minimal environmental impact. IGT has developed the U-GAS process to produce a low- or medium-Btu gas from different types of coal feedstocks. The process uses a combination of fluidized=bed gasification and ash agglomeration in a single-stage reactor. A 30-tons/day-capacity pilot plant located in Chicago has been used to develop the process. Feedstocks ranging from relatively unreactive metallurgical coke to highly reactive peat have been gasified successfully in the this pilot plant, indicating its ability to handle a feedstock with widely varying properties. A new 10 megawatt pilot plant has been designed and is under construction in Tampere, Finland, as the first step toward the commercialization of this technology. Tampella is planning to design and deliver a commercial-scale IGCC demonstration plant by 1994. 7 refs., 5 figs.

Lau, F.S. [Institute of Gas Technology, Chicago, IL (United States); Salo, K. [Tampella Power, Tampere (Finland)

1991-12-01T23:59:59.000Z

10

ConocoPhillips Sweeny IGCC/CCS Project  

SciTech Connect

Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

Paul Talarico; Charles Sugg; Thomas Hren; Lauri Branch; Joseph Garcia; Alan Rezigh; Michelle Pittenger; Kathleen Bower; Jonathan Philley; Michael Culligan; Jeremy Maslen; Michele Woods; Kevin Elm

2010-06-16T23:59:59.000Z

11

Pinon Pine IGCC project status update, August 1992  

Science Conference Proceedings (OSTI)

Since the recent (August, 1992) execution of the Cooperative Agreement, the major focus of work has been on critical-path environmental permitting activities, both related to the NEPA process as well as state and local activities. Pending approval of the project by the Nevada Public Service Commission, detailed engineering activities will commence in November. Federal funding of the project automatically invokes environmental review under the National Environmental Policy Act (NEPA). This project will require an Environmental Impact Statement, or EIS, with DOE as the lead agency for the NEPA reviews. The project must also be approved by the Nevada Public Service Commission (PSCN) in the state`s Resource Planning process. As shown in the project schedule, Figure 4 below, SPPCo. expects to have the combustion turbine portion of the plant on line by late 1994, configured as a simple-cycle natural gas machine with either No. 2 diesel or propane being utilized as backup fuel. By phasing construction in this manner, SPPCo. gains approximately 45 MWe of peaking power capacity to match projections of customer loads. The gasifier, heat recovery steam generator (HRSG), and the balance of the IGCC plant will be commissioned in late 1996. A DOE demonstration period of 42 months is planned.

Motter, J.W.; Pitcher, J.D.; Fankhanel, M.; Campbell, W.

1992-11-01T23:59:59.000Z

12

Pinon Pine IGCC project status update, August 1992  

Science Conference Proceedings (OSTI)

Since the recent (August, 1992) execution of the Cooperative Agreement, the major focus of work has been on critical-path environmental permitting activities, both related to the NEPA process as well as state and local activities. Pending approval of the project by the Nevada Public Service Commission, detailed engineering activities will commence in November. Federal funding of the project automatically invokes environmental review under the National Environmental Policy Act (NEPA). This project will require an Environmental Impact Statement, or EIS, with DOE as the lead agency for the NEPA reviews. The project must also be approved by the Nevada Public Service Commission (PSCN) in the state's Resource Planning process. As shown in the project schedule, Figure 4 below, SPPCo. expects to have the combustion turbine portion of the plant on line by late 1994, configured as a simple-cycle natural gas machine with either No. 2 diesel or propane being utilized as backup fuel. By phasing construction in this manner, SPPCo. gains approximately 45 MWe of peaking power capacity to match projections of customer loads. The gasifier, heat recovery steam generator (HRSG), and the balance of the IGCC plant will be commissioned in late 1996. A DOE demonstration period of 42 months is planned.

Motter, J.W.; Pitcher, J.D.; Fankhanel, M.; Campbell, W.

1992-01-01T23:59:59.000Z

13

Status of Tampa Electric Company IGCC Project  

SciTech Connect

Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit [number sign]1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

Jenkins, S.D.

1992-01-01T23:59:59.000Z

14

Status of Tampa Electric Company IGCC Project  

SciTech Connect

Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit {number_sign}1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

Jenkins, S.D.

1992-10-01T23:59:59.000Z

15

Kemper County IGCC (tm) Project Preliminary Public Design Report  

SciTech Connect

The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facilitys carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

2012-07-01T23:59:59.000Z

16

PinonPine IGCC Power Project: A DOE Assesment  

NLE Websites -- All DOE Office Websites (Extended Search)

Piñon Pine IGCC Power Project Piñon Pine IGCC Power Project A DOE Assessment DOE/NETL-2003/1183 December 2002 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 West Third Street, Suite 1400 Tulsa, OK 74103-3519 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

17

CE IGCC repowering project: Controls & instrumentation. Topical report, June 1993  

Science Conference Proceedings (OSTI)

The IGCC Control System is used to provide operator interface and controls for manual and auto operation of the IGCC Repowering Project Located at Springfield, Illinois. A Distributed Control System (DCS) is provided for analog (process control) loop functions and to provide the operator interface. A Data Acquisition System (DAS) is provided for gathering performance data and optimization. Programmable Logic Controllers will be provided for the following digital control systems: (a) GSSS (Gasifier Supervisory Safety System) including pulverized coal handling and char handling; (b) Coal Pulverization System; (c) HRSG (Heat Recovery Steam Generation); (d) Hot Gas Cleanup System; (e) Steam Turbine; and (f) Combined Cycle Operation. In general all systems are provided for auto/manual cascade operation; upstream equipment is interlocked to be proven in service operation and/or valve position before downstream equipment may operate.

Not Available

1993-12-01T23:59:59.000Z

18

Excelsior Energy Mesaba IGCC Project Preliminary Design Specification  

Science Conference Proceedings (OSTI)

With Integrated Gasification Combined Cycle (IGCC) technology now entering commercial service, the industry needs specifications that encourage greater standardization in IGCC design. Standardization lowers initial capital cost; supports repeatable, reliable performance; and reduces the time and cost to develop decision-quality economics for potential IGCC plant owners. This CoalFleet Preliminary Design Specification (PDS) defines technical information provided in the permit application submitted by Exce...

2006-12-11T23:59:59.000Z

19

Secretary Chu Announces $14 Million for Six New Projects to Advance IGCC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14 Million for Six New Projects to Advance 14 Million for Six New Projects to Advance IGCC Technology Secretary Chu Announces $14 Million for Six New Projects to Advance IGCC Technology September 9, 2011 - 1:00pm Addthis Washington, DC - U.S. Department of Energy Secretary Steven Chu announced today the selection of six projects aimed at developing technologies to lower the cost of producing electricity in integrated gasification combined cycle (IGCC) power plants using carbon capture, while maintaining the highest environmental standards. Supported with up to $14 million in total funding, the selected projects will improve the economics of IGCC plants and promote the use of the Nation's abundant coal resources to produce clean, secure, and affordable energy. The successful development of advanced technologies and innovative concepts

20

Secretary Chu Announces $14 Million for Six New Projects to Advance IGCC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Million for Six New Projects to Advance 4 Million for Six New Projects to Advance IGCC Technology Secretary Chu Announces $14 Million for Six New Projects to Advance IGCC Technology September 9, 2011 - 6:16pm Addthis Washington, D.C. -U.S. Department of Energy Secretary Steven Chu announced today the selection of six projects aimed at developing technologies to lower the cost of producing electricity in integrated gasification combined cycle (IGCC) power plants using carbon capture, while maintaining the highest environmental standards. Supported with up to $14 million in total funding, the selected projects will improve the economics of IGCC plants and promote the use of the Nation's abundant coal resources to produce clean, secure, and affordable energy. The successful development of advanced technologies and innovative concepts

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Nuon Magnum Integrated-Gasification -Combined-Cycle (IGCC) Project Preliminary Design Specification  

Science Conference Proceedings (OSTI)

This is the second pre-design specification (PDS) in a projected series for integrated-gasificationcombined-cycle (IGCC) plants, sponsored by EPRIs CoalFleet for Tomorrow program and involving more than 50 power industry companies. A PDS represents the level of nonproprietary information available at the feasibility study stage in the development of an IGCC project. This PDS is based on the design of the 1200-MWe Magnum IGCC plant, which Nuon Power Generation B.V. has proposed to build on the northern co...

2008-03-31T23:59:59.000Z

22

DOE-Sponsored IGCC Project in Texas Takes Important Step Forward |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Sponsored IGCC Project in Texas Takes Important Step Forward DOE-Sponsored IGCC Project in Texas Takes Important Step Forward DOE-Sponsored IGCC Project in Texas Takes Important Step Forward June 20, 2011 - 1:00pm Addthis Washington, DC - A newly signed memorandum of understanding (MOU) for the purchase of electricity produced by the Texas Clean Energy Project (TCEP) is an important step forward for what will be one of the world's most advanced and cleanest coal-based power plants, funded in part by the U.S. Department of Energy (DOE). Under the MOU, CPS Energy - a municipally owned utility serving San Antonio, Texas - will purchase electricity generated by the first-of-a-kind commercial clean coal power plant, starting in mid 2014. TCEP, a 400-megawatt integrated gasification combined cycle (IGCC) facility located

23

PinonPine IGCC Power Project: A DOE Assesment  

NLE Websites -- All DOE Office Websites (Extended Search)

turbine, the IGCC process can also be modified to produce value-added chemicals or transportation fuels from coal by chemical processing of the CO and H 2 in the fuel gas...

24

Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996  

SciTech Connect

This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

1998-02-01T23:59:59.000Z

25

IGCC+S Financing  

NLE Websites -- All DOE Office Websites (Extended Search)

II II William G. Rosenberg, Dwight C. Alpern, Michael R. Walker Energy Technology Innovation Project a joint project of the Science, Technology and Public Policy Program and the Environment and Natural Resources Program Belfer Center for Science and International Affairs 2 0 0 4 - 0 8 J U LY 2 0 0 4 Deploying IGCC in this Decade with 3Party Covenant Financing VOLUME II William G. Rosenberg, Dwight C. Alpern, and Michael R. Walker Energy Technology Innovation Project a joint project of the Science, Technology and Public Policy Program and the Environment and Natural Resources Program Belfer Center for Science and International Affairs and Center for Business and Government John F. Kennedy School of Government Harvard University July 2004 Financing IGCC - 3Party Covenant ii

26

Worldwide activity in IGCC  

SciTech Connect

EPRI has pursued the development of integrated gasification-combined-cycle technology because it is the cleanest method available for making electricity from coal. Now, a decade after the establishment of the first IGCC demonstration plant, environmental regulations are encouraging the adoption of this technology in a number of countries. An unexpected innovation is the use of residual oil as an IGCC feedstock, a practice that evolved naturally as a result of market forces. Experts are hopeful that the current momentum in IGCC will trigger the introduction of the technology in developing countries, many of which rely heavily on coal and oil for power generation. Environmental regulations and a market glut of low-grade fossil fuels are spurring an unprecedented number of integrated gasification combined-cycle projects worldwide. These projects are described.

Lamarre, L.

1994-07-01T23:59:59.000Z

27

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A-1 A-1 APPENDIX A CONSULTATION LETTERS This appendix includes consultation/approval letters between the U.S. Department of Energy and the U.S. Fish and Wildlife Service regarding threatened and endangered species, and between other state and Federal agencies as needed. Consultation Letters A-2 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-3 Consultation Letters A-4 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-5 Consultation Letters A-6 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-7 Consultation Letters A-8 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement B-1 APPENDIX B NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE

28

NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

Terry W. Battiest

2008-06-11T23:59:59.000Z

29

Tampa Electric Company - DOE IGCC project. Quarterly report, July 1 - September 30, 1996  

SciTech Connect

The third quarter of 1996 has resulted in the completion of over five (5) years of extensive project development, design, construction and start-up of the 250 MW Polk Power Station Unit {number_sign}1 IGCC Project. the combined cycle performance test was completed on June 18, 1996. This test demonstrated that on distillate fuel, the combined cycle achieved a net output of 222,299 KW with a net heat rate of 6,868 BTU/KW. This is about 3.86% and 2.76% better than the guaranteed values of 214,040 KW and 7,063 BTU/KW respectively. During the third quarter of 1996, the combustion turbine was run on syngas two (2) different times for a combined total of about seven hours. Attachment {number_sign}4 shows graphically the transfer from oil to syngas. Emission levels were generally acceptable even though no specific emissions tuning was completed by GE and the emissions monitoring equipment was not yet completely operational.

1996-12-31T23:59:59.000Z

30

[Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996  

SciTech Connect

Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

NONE

1997-12-31T23:59:59.000Z

31

Nucla CFB Demonstration Project  

SciTech Connect

This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

Not Available

1990-12-01T23:59:59.000Z

32

NETL: News Release - DOE-Sponsored IGCC Project in Texas Takes Important  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 1, 2011 DOE-Sponsored IGCC Project in Texas Takes Important Step Forward MOU Provides for Electricity Purchase from First-of-a-Kind Commercial IGCC Power Plant Washington, DC - A newly signed memorandum of understanding (MOU) for the purchase of electricity produced by the Texas Clean Energy Project (TCEP) is an important step forward for what will be one of the world's most advanced and cleanest coal-based power plants, funded in part by the U.S. Department of Energy (DOE). Under the MOU, CPS Energy - a municipally owned utility serving San Antonio, Texas - will purchase electricity generated by the first-of-a-kind commercial clean coal power plant, starting in mid 2014. TCEP, a 400-megawatt integrated gasification combined cycle (IGCC) facility located about 15 miles west of Odessa, will capture 90 percent of its carbon dioxide (CO2) - approximately 3 million tons annually - more than any power plant of commercial scale operating anywhere in the world.

33

IGCC vision  

SciTech Connect

In an Integrated Gasification Combined Cycle (IGCC), fuel gas, which is composed of hydrogen and carbon oxides, is generated in a gasifier by coal reacting with steam and air or oxygen. The pressurized fuel gas is then cleaned and fed to a high-efficiency combustion gas turbine to generate power. The hot exhaust gas from the gas turbine produces steam to drive a steam turbine to make additional power. Integration of the inherent advantages of coal gasification and combined cycles results in an ultra high-efficiency, super-clean, low-cost power plant. IGCC plants being demonstrated can achieve efficiencies of 42% (HHV) and with continuous improvements over the next 15 to 20 years, 52% efficiency is achievable. When compared to existing coal plants with flue gas desulfurization, which have efficiencies of about 34%, IGCC reduces by 35% the CO{sub 2} emission because less coal is required to generate an equivalent power. Commercialization of IGCC will result in low-cost power from coal without environmental compromise. These features are crucial to US competitiveness in the world.marketplace. Preservation and creation of jobs will depend on a strong mining and manufacturing sector enhanced by export markets for coal and power generation equipment.

1993-05-01T23:59:59.000Z

34

PFBC Utility Demonstration Project  

Science Conference Proceedings (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

35

Could IGCC swing  

SciTech Connect

A few big-name utilities are looking to make big-time power from gasified coal. AEP has utility-scale integrated gasification combined cycle (IGCC) plants in the works for Ohio and West Virginia. Duke Energy Indiana plans to build a 630 MW IGCC plant at Edwardsport to replace the existing 160 MW coal-fired unit there. NRG hopes to build utility-scale IGCC plants in New York and Delaware. Tampa Electric has announced plans to build a 630 MW IGCC at its Polk site, already the location of a 260 MW IGCC. In Taylorville, IL, another power-oriented IGCC is under development, owned by individuals from original developer ERORA and Omaha-based Tenaska. And yet another power producing IGCC is being proposed by Tondu Corporation at Corpus Christi, Texas to be fired by petroleum coke, also known as petcoke. The article gives an overview of these developments and moves on to discuss the popular question of the economic viability of IGCC making marketable byproducts in addition to power. Several projects are under way to make synthetic natural gas for coal. These are reported. Although the versatility of gasification may well give the ability to swing from various levels of power production to various levels of co-producing one or more products, for the time being it appears the IGCCs being built will produce power only, along with elemental sulphur and slag.

Blankinship, S.

2007-06-15T23:59:59.000Z

36

Solar energy demonstration project  

SciTech Connect

The solar heating demonstration system at the DOE cafeteria at Grand Junction, Colorado, is briefly described. The system will supply an estimated 40 percent of the energy required for domestic hot water and building heat. (WHK)

1978-01-01T23:59:59.000Z

37

LIMB Demonstration Project Extension  

Science Conference Proceedings (OSTI)

The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

Not Available

1988-12-15T23:59:59.000Z

38

LIMB Demonstration Project Extension  

Science Conference Proceedings (OSTI)

The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full-scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO and NO emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

Not Available

1988-09-15T23:59:59.000Z

39

Solar Thermal Demonstration Project  

SciTech Connect

HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with ??Kalwall?? building panels. An added feature of the ??Kalwall? system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

Biesinger, K.; Cuppett, D.; Dyer, D.

2012-01-30T23:59:59.000Z

40

Tampa Electric Company IGCC Project. Quarterly report, April 1 - June 30, 1996  

SciTech Connect

Tampa Electric Company continued efforts to complete construction and start-up of the Polk Power Station, Unit {number_sign}1 which will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. From an overall standpoint, the Project continues to track well. The completion of construction system turnovers to Start-up is encouraging. Start-up will accept responsibility of the plant until turnover to operations. The major focus continues to be on the production of first Syngas, scheduled for July 17. All construction, engineering, and start-up activities are in support of Syngas production. Key activities toward this goal include final checkout and startup of remaining gasification systems, completion of punch list items required for first syngas, finalization of operating procedures, preparation of site and area access control plans, site- wide safety training, and other Process Safety management (PSM) requirements.

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE-Sponsored IGCC Project Could Lead to Lower-Cost Carbon Capture...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

manufactured catalysts can produce both power generation increases and significant cost savings at Integrated Gasification Combined Cycle (IGCC) power plants, according to...

42

LIMB Demonstration Project Extension and Coolside Demonstration  

SciTech Connect

This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

Goots, T.R.; DePero, M.J.; Nolan, P.S.

1992-11-10T23:59:59.000Z

43

CE IGCC repowering project preliminary hazard analysis. Topical report, November 1, 1990--May 31, 1993  

SciTech Connect

A preliminary hazard analysis was conducted on the CE IGCC unit by representatives from ABB Lummus Crest Process Systems, Lummus Technical Division, Combustion Engineering, and Lummus Initial Operations. As a basis for the review, available technical data and documentation was used. Two areas of the unit were reviewed, the coal yard delivery system and the gasifier island. The coal yard consists of the coal delivery and handling systems, both of these systems are conventional. The gasifier island encompasses the coal pulverizer and feed system, gasifier and syngas cooler, char removal system, char recycle system, and high temperature sulfur removal system. With first of a kind equipment incorporated in the gasifier island, most of the concerns of potential hazards were centered here. At the time of the review, there were no process flow diagrams for the rest of the combined cycle. To prevent detaining the review of the gasifier island, the remaining areas were not reviewed at this time. However, the remaining areas will be reviewed before final unit design is completed. In reviewing the above mentioned systems, the PHA identified several hazards which will be the basis for a subsequent detailed Hazard and Operability (HAZOP) study which will be performed at a later stage of this project. Results from the evaluation were documented by the team and then reviewed by engineers in the IGCC Product Development department. From the concerns of risks developed by the review team, rethinking of proposed operation and design of the plant during the preliminary design stages took place. (In doing so, cost and redesign time during final design phase will be reduced).

Peletz, L.J.

1993-06-01T23:59:59.000Z

44

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round...  

NLE Websites -- All DOE Office Websites (Extended Search)

the Clean Coal Technology Program: Combustion Engineering IGCC Repowering Project, Clean Energy Demonstration Project (Oct 1994) -- Not Available PAPERS AND PRESENTATIONS...

45

NETL: CCPI - Demonstration of a Coal-Based Transport Gasifier...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Energy California Project: Commercial Demonstration of Advanced IGCC with Full Carbon Capture Greenfield Site, Kern County, California PROJECT FACT SHEET Hydrogen Energy...

46

Shallow Carbon Sequestration Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Shallow Carbon SequeStration Shallow Carbon SequeStration DemonStration ProjeCt Background The Shallow Carbon Sequestration Pilot Demonstration Project is a cooperative effort involving City Utilities of Springfield (CU); Missouri Department of Natural Resources (MDNR); Missouri State University (MSU); Missouri University of Science & Technology (MS&T); AmerenUE; Aquila, Inc.; Associated Electric Cooperative, Inc.; Empire District Electric Company; and Kansas City Power & Light. The purpose of this project is to assess the feasibility of carbon sequestration at Missouri power plant sites. The six electric utilities involved in the project account for approximately 90 percent of the electric generating capacity in Missouri. Description The pilot demonstration will evaluate the feasibility of utilizing the Lamotte and

47

Energy Storage Demonstration Project Locations | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Project Locations Energy Storage Demonstration Project Locations Map of the United States showing the location of Energy Storage Demonstration projects created with...

48

Energy Storage Demonstration Project Locations | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Storage Demonstration Project Locations Energy Storage Demonstration Project Locations Map of the United States showing the location of Energy Storage Demonstration projects...

49

CE IGCC repowering project: Clean Coal II Project. Annual report, 1 January, 1992--31 December, 1992  

SciTech Connect

CE is participating in a $270 million coal gasification combined cycle repowering project that will provide a nominal 60 MW of electricity to City, Water, light and Power (CWL and P) in Springfield, Illinois. The IGCC system will consist of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-Btu gas: and all necessary coal handling equipment. The project is currently in the second budget period of five. The major activities during this budgeted period are: Establishment of an approved for design (AFD) engineering package; development of a detailed cost estimate; resolution of project business issues; CWL and P renewal and replacement activities; and application for environmental air permits. The Project Management Plan was updated. The conceptual design of the plant was completed and a cost and schedule baseline for the project was established previously in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities are continuing. At the end of 1992 the major activities remaining for Budget Period two is to finish the cost estimate and complete the Continuation Request Documents.

Not Available

1993-12-01T23:59:59.000Z

50

Independent Oversight Review, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation -...

51

Transportable Combustion Turbine Demonstration Project  

Science Conference Proceedings (OSTI)

New York State Electric and Gas Corporation (NYSEG) installed a 7.15-MW Solar Taurus 70 (nominal 7 MW) gas combustion turbine (CT) at its State Street substation in Auburn, New York. As a demonstration project supported through EPRI's Tailored Collaboration (TC) program, it is intended to aid in better understanding the "complete picture" for siting this particular technology as a distributed resource (DR).

2001-12-14T23:59:59.000Z

52

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Program: Toms Creek IGCC Demonstration Project (Sept 1992) U.S. Department of Energy report DOEFE-0264P (Available from NTIS as DE93000960) PAPERS AND PRESENTATIONS...

53

IGCC+S Financing  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Center, Natural Resources Defense Counsel and Jeff Cohen, White House Taskforce on Energy Project Streamlining. The project would also like to offer special thanks...

54

Clean Coal Diesel Demonstration Project  

DOE Green Energy (OSTI)

A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

Robert Wilson

2006-10-31T23:59:59.000Z

55

CE IGCC Repowering Project: Use of the Lockheed Kinetic Extruder for coal feeding; Topical report, June 1993  

SciTech Connect

ABB CE is evaluating alternate methods of coal feed across a pressure barrier for its pressurized coal gasification process. The Lockheed Kinetic Extruder has shown to be one of the most promising such developments. In essence, the Kinetic Extruder consists of a rotor in a pressure vessel. Coal enters the rotor and is forced outward to the surrounding pressure vessel by centrifugal force. The force on the coal passing across the rotor serves as a pressure barrier. Should this technology be successfully developed and tested, it could reduce the cost of IGCC technology by replacing the large lockhoppers conventionally used with a much smaller system. This will significantly decrease the size of the gasifier island. Kinetic Extruder technology needs testing over an extended period of time to develop and prove the long term reliability and performance needed in a commercial application. Major issues to be investigated in this program are component design for high temperatures, turn-down, scale-up factors, and cost. Such a test would only be economically feasible if it could be conducted on an existing plant. This would defray the cost of power and feedstock. Such an installation was planned for the CE IGCC Repowering Project in Springfield, Illinois. Due to budgetary constraints, however, this provision was dropped from the present plant design. It is believed that, with minor design changes, a small scale test version of the Kinetic Extruder could be installed parallel to an existing lockhopper system without prior space allocation. Kinetic Extruder technology represents significant potential cost savings to the IGCC process. For this reason, a test program similar to that specified for the Springfield project would be a worthwhile endeavor.

NONE

1994-02-01T23:59:59.000Z

56

Advanced IGCC power systems for the United States  

SciTech Connect

Integrated coal gasification combined-cycle (IGCC) power systems offer the potential of superior efficiency and environmental performance over power plants using pulverized coal-fired boilers with scrubbers to generate electricity in the United States. The Cool Water plant is demonstrating the feasibility of an IGCC system using an entrained-bed gasifier and ''cold'' gas cleanup technology. Technology is now being developed to simplify the IGCC system, increase its efficiency and reduce its capital costs. Hot gas sulfur and particulate cleanup is the most promising technology option for the gas supply block. Improved performance is also available from the power island by use of high-efficiency aircraft derivative turbines. Progress in these technologies and the exceptional match of these IGCC systems to the projected needs of the utility industry is presented.

Wieber, P.R.; Halow, J.S.

1986-01-01T23:59:59.000Z

57

The ITER Project: International Collaboration to Demonstrate...  

NLE Websites -- All DOE Office Websites (Extended Search)

ITER Project: International Collaboration to Demonstrate Nuclear Fusion American Fusion News Category: U.S. ITER Link: The ITER Project: International Collaboration to Demonstrate...

58

Automated Demand Response Technology Demonstration Project for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings...

59

High-Temperature Superconductivity Cable Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High-Temperature Superconductivity Cable Demonstration Projects High-Temperature Superconductivity Cable Demonstration Projects A National Effort to Introduce New Technology into...

60

Combustion Engineering Integrated Gasification Combined Cycle (IGCC) Repowering Project -- Clean Coal II Project. Annual report, November 20, 1990--December 31, 1991  

SciTech Connect

The IGCC system will consist of CE`s air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine adapted to use low-Btu coal gas; and all necessary coal handling equipment. The IGCC will include CE`s slogging, entrained-flow, gasifier operating in a pressurized mode and using air as the oxidant. The hot gas will be cleaned of particulate matter (char) which is recycled back to the gasifier. After particulate removal, the product gas will be cleaned of sulfur prior to burning in a gas turbine. The proposed project includes design and demonstration of two advanced hot gas cleanup processes for removal of sulfur from the product gas of the gasifier. The primary sulfur removal method features a newly developed moving-bed zinc ferrite system downstream of the gasifier. The process data from these pilot tests is expected to be sufficient for the design of a full-scale system to be used in the proposed demonstration. A second complementary process is in situ desulfurization achieved by adding limestone or dolomite directly to the coal feed. The benefit, should such an approach prove viable, is that the downstream cleanup system could be reduced in size. In this plant, the gasifier will be producing a low-Btu gas (LBG). The LBG will be used as fuel in a standard GE gas turbine to produce power. This gas turbine will have the capability to fire LBG and natural gas (for start-up). Since firing LBG uses less air than natural gas, the gas turbine air compressor will have extra capacity. This extra compressed air will be used to pressurize the gasifier and supply the air needed in the gasification process. The plant is made of three major blocks of equipment as shown in Figure 2. They are the fuel gas island which includes the gasifier and gas cleanup, gas turbine power block, and the steam turbine block which includes the steam turbine and the HRSG.

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement November 2002 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project Final Environmental Impact Statement (EIS) (DOE/EIS-0318) Location: Clark County, Kentucky Contacts: For further information on this environmental For further information on the DOE National impact statement (EIS), call: Environmental Policy Act (NEPA) process, call: 1-800-432-8330 ext. 5460 1-800-472-2756 or contact: or contact: Mr. Roy Spears Ms. Carol Borgstrom

62

Refinery IGCC plants are exceeding 90% capacity factor after 3 years  

SciTech Connect

Steep learning curves for commercial IGCC plants in Italy show annual capacity factors of 55-60% in the first year of service and improvement to over 90% after the third year. The article reviews the success of three IGCC projects in Italy - those of ISAB Energy, Sarlux Saras and Api Energy. EniPower is commissioning a 250 MW IGCC plant that will burn syngas produced by gasification of residues at an adjacent Eni Sannazzaro refinery in north central Italy. The article lists 14 commercially operating IGCC plants worldwide that together provide close to 3900 MW of generating capacity. These use a variety of feedstock-coals, petroleum coke and refinery residues and biomass. Experience with commercial scale plants in Europe demonstrates that IGCC plants can operate at capacity factors comparable to if not better than conventional coal plants. 2 figs., 1 photo.

Jaeger, H.

2006-01-15T23:59:59.000Z

63

Demonstration Project 111 ITS/CVO Technology Truck Final Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

1277 Demonstration Project 111 ITSCVO Technology Truck Final Project Report December 2001 Prepared by G. J. Capps, ORNL Project Manager K. P. Gambrell, Technical Associate K. L....

64

West Valley Demonstration Project Transportation Emergency Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance...

65

[Tampa Electric Company IGCC project]. Final public design report; Technical progress report  

SciTech Connect

This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

NONE

1996-07-01T23:59:59.000Z

66

Vehicle to Grid Demonstration Project  

SciTech Connect

This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

2010-12-31T23:59:59.000Z

67

Independent Oversight Review, West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) in September 2000.

68

LADWP FUEL CELL DEMONSTRATION PROJECT  

SciTech Connect

Los Angeles Department of Water and Power (LADWP) is currently one of the most active power utility companies in researching fuel cell technology. Fuel cells offer many benefits and are now used as an alternative to traditional internal combustion engines in power generation. In continuing it's role as the leader in fuel cell research, LADWP has installed a pre-commercial molten carbonate fuel cell on August 2001 at its headquarter, the John Ferraro Building (JFB). The goal of this project is to learn more about the actual behavior of the fuel cell running under real world conditions. The fuel cell ran smoothly through the first year of operation with very high efficiency, but with some minor setbacks. The JFB fuel cell project is funded by the City of Los Angeles Department of Water and Power with partial grant funding from the Department of Defense's Climate Change Fuel Cell Buydown Program. The technical evaluation and the benefit-cost evaluation of the JFB fuel cell are both examined in this report.

Thai Ta

2003-09-12T23:59:59.000Z

69

LADWP FUEL CELL DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

Los Angeles Department of Water and Power (LADWP) is currently one of the most active power utility companies in researching fuel cell technology. Fuel cells offer many benefits and are now used as an alternative to traditional internal combustion engines in power generation. In continuing it's role as the leader in fuel cell research, LADWP has installed a pre-commercial molten carbonate fuel cell on August 2001 at its headquarter, the John Ferraro Building (JFB). The goal of this project is to learn more about the actual behavior of the fuel cell running under real world conditions. The fuel cell ran smoothly through the first year of operation with very high efficiency, but with some minor setbacks. The JFB fuel cell project is funded by the City of Los Angeles Department of Water and Power with partial grant funding from the Department of Defense's Climate Change Fuel Cell Buydown Program. The technical evaluation and the benefit-cost evaluation of the JFB fuel cell are both examined in this report.

Thai Ta

2003-09-12T23:59:59.000Z

70

IGCC system studies  

Science Conference Proceedings (OSTI)

Systems studies are performed on both the currently available, but not fully demonstrated, integrated gasification combined-cycle (IGCC) technologies and the future technologies. The objective of these studies is to support and guide the Morgantown Energy Technology Center`s METC Strategic Product Planning efforts. Through these efforts, the research, development and demonstration needs of various alternative gasification and power island components can be quantified and factored into the overall planning processes.

Rath, L.K.

1994-10-01T23:59:59.000Z

71

IGCC rides a regulatory seesaw  

SciTech Connect

The Mesaba Energy Project to build a 603 MW IGCC power plant in Minnesota's Iron Range may or may not go ahead. Developers have proposed incorporating carbon capture and sequestration (CCS), including a pipeline. Opponents insist Mesaba should not go ahead unless it uses CCS immediately. Until November the project looked on the road to recovery but then the regulators came close to derailing the project citing recent delays and cancellations of IGCC projects in Florida, Colorado and Arizona. The next step is to work with the US DOE to structure the loan guarantee and to work with regulators in Minnesota to structure an off-take plan. 1 photo.

Blankinship, S.

2007-11-15T23:59:59.000Z

72

DOE IGCC Project. Fourth quarterly report, [October 1, 1993--December 31, 1993  

SciTech Connect

We have previously reported a decision to move the simple cycle commercial operation to a date coincident with the July 1, 1996 Integrated Gasification Combined Cycle (IGCC) commercial operation date. This necessitated a major rescheduling of the engineering and construction efforts to ensure a totally coordinated plan. This rescheduling was completed in mid October 1994 and resulted in an integrated engineering and construction schedule. The major effort in the fourth quarter of 1994 centered around equipment procurement to support the new integrated plan. This is required so that sufficient engineering details will be available to generate construction bid packages with at least 90% completed effort. During the reporting period 43 material requisitions (MR`s) were issued for bids. Also during-the reporting period a total of 14 purchase orders were issued including the generator step-up transformer and major columns and vessels. Bid packages were prepared, for bid submittal in January 1994, for a turnkey sulfuric acid plant and for the transportation/erection of the radiant syngas cooler (RSC). The original concept was for MAN GHH to deliver the RSC as part of their design and fabrication contract. However, in an attempt to improve coordination for the overall handling of this significant piece of equipment, it was decided to remove the transportation from MAN GHH`s scope of work and include the transportation with the RSC erection contract. Initial indication from prospective bidders and Bechtel are that lower total costs will be achieved in addition to the expected improved coordination.

1994-02-23T23:59:59.000Z

73

Navy fuel cell demonstration project.  

DOE Green Energy (OSTI)

This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

Black, Billy D.; Akhil, Abbas Ali

2008-08-01T23:59:59.000Z

74

IGCC offers diversity for competitive generation  

SciTech Connect

Over the last couple of years, integrated gasification combined-cycle (IGCC) power plants have begun penetrating competitive markets, Japan and Taiwan are applying IGCC technology in their first round of independent power producer bidding. The versatility of this technology is adding to its cachet, as it finds its niche in a variety of market segments and applications. In the US, the hottest niche for IGCC is seen in repowering of existing facilities. Increased use in the coal-powered portion of the market is projected in the next decade, as gas turbine technology advances are expected to drive the spread of IGCC beyond industrial applications.

Chambers, A.

1997-11-01T23:59:59.000Z

75

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project - July 2012 Independent Activity Report, New Brunswick Laboratory - November 2011 Orientation Visit to the Paducah Gaseous Diffusion Plant,...

76

Filter systems for IGCC applications  

SciTech Connect

The objectives of this program were to identify metallic filter medium to be utilized in the Integrated Gasification Combined Cycle process (IGCC). In IGCC processes utilizing high efficiency desulfurizing technology, the traditional corrosion attack, sulfidation, is minimized so that metallic filters are viable alternatives over ceramic filters. Tampa Electric Company`s Polk Power Station is being developed to demonstrate Integrated Gasification Combined Cycle technology. The Pall Gas Solid Separation (GSS) System is a self cleaning filtration system designed to remove virtually all particulate matter from gas streams. The heart of the system is the filter medium used to collect the particles on the filter surface. The medium`s filtration efficiency, uniformity, permeability, voids volume, and surface characteristics are all important to establishing a permeable permanent cake. In-house laboratory blowback tests, using representative full scale system particulate, were used to confirm the medium selection for this project. Test elements constructed from six alloys were supplied for exposure tests: PSS 310SC (modified 310S alloy); PSS 310SC heat treated; PSS 310SC-high Cr; PSS 310SC-high Cr heat treated; PSS Hastelloy X; and PSS Hastelloy X heat treated.

Bevan, S.; Gieger, R.; Sobel, N.; Johnson, D.

1995-11-01T23:59:59.000Z

77

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

78

Milestone Project Demonstrates Innovative Mercury Emissions Reduction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Project Demonstrates Innovative Mercury Emissions Milestone Project Demonstrates Innovative Mercury Emissions Reduction Technology Milestone Project Demonstrates Innovative Mercury Emissions Reduction Technology January 12, 2010 - 12:00pm Addthis Washington, DC - An innovative technology that could potentially help some coal-based power generation facilities comply with anticipated new mercury emissions standards was successfully demonstrated in a recently concluded milestone project at a Michigan power plant. Under a cooperative agreement with the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL), WE Energies demonstrated the TOXECON(TM) process in a $52.9million project at the Presque Isle Power Plant in Marquette, Mich. TOXECON is a relatively cost-effective option for achieving significant reductions in mercury emissions and increasing the

79

Mesaba next-generation IGCC plant  

Science Conference Proceedings (OSTI)

Through a US Department of Energy (DOE) cooperative agreement awarded in June 2006, MEP-I LLC plans to demonstrate a next generation integrated gasification-combined cycle (IGCC) electric power generating plant, the Mesaba Energy Project. The 606-MWe plant (the first of two similarly sized plants envisioned by project sponsors) will feature next-generation ConocoPhillips E-Gas{trademark} technology first tested on the DOE-funded Wabash River Coal Gasification Repowering project. Mesaba will benefit from recommendations of an industry panel applying the Value Improving Practices process to Wabash cost and performance results. The project will be twice the size of Wabash, while demonstrating better efficient, reliability and pollutant control. The $2.16 billion project ($36 million federal cost share) will be located in the Iron Range region north of Duluth, Minnesota. Mesaba is one of four projects selected under Round II of the Clean Coal Power Initiative. 1 fig.

NONE

2006-01-01T23:59:59.000Z

80

Power Plant Optimization Demonstration Projects Cover Photos:  

NLE Websites -- All DOE Office Websites (Extended Search)

5 SEPTEMBER 2007 5 SEPTEMBER 2007 Power Plant Optimization Demonstration Projects Cover Photos: * Top left: Coal Creek Station * Top right: Big Bend Power Station * Bottom left: Baldwin Energy Complex * Bottom right: Limestone Power Plant A report on four projects conducted under separate cooperative agreements between the U.S. Department of Energy and: * Great River Energy * Tampa Electric Company * Pegasus Technologies * NeuCo. , Inc.  Power Plant Optimization Demonstration Projects Executive Summary .......................................................................................4 Background: Power Plant Optimization ......................................................5 Lignite Fuel Enhancement Project ...............................................................8

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Tidd PFBC Demonstration Project, A DOE Assessment  

Science Conference Proceedings (OSTI)

The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

National Energy Technology Laboratory

2001-08-31T23:59:59.000Z

82

INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION  

DOE Green Energy (OSTI)

With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water treatment/instrument air, and power conditioning/controls were built and shipped to the site. The two fuel cell modules, each rated at 1 MW on natural gas, were fabricated by FuelCell Energy in its Torrington, CT manufacturing facility. The fuel cell modules were conditioned and tested at FuelCell Energy in Danbury and shipped to the site. Installation of the power plant and connection to all required utilities and syngas was completed. Pre-operation checkout of the entire power plant was conducted and the plant was ready to operate in July 2004. However, fuel gas (natural gas or syngas) was not available at the WREL site due to technical difficulties with the gasifier and other issues. The fuel cell power plant was therefore not operated, and subsequently removed by October of 2005. The WREL fuel cell site was restored to the satisfaction of WREL. FuelCell Energy continues to market carbonate fuel cells for natural gas and digester gas applications. A fuel cell/turbine hybrid is being developed and tested that provides higher efficiency with potential to reach the DOE goal of 60% HHV on coal gas. A system study was conducted for a 40 MW direct fuel cell/turbine hybrid (DFC/T) with potential for future coal gas applications. In addition, FCE is developing Solid Oxide Fuel Cell (SOFC) power plants with Versa Power Systems (VPS) as part of the Solid State Energy Conversion Alliance (SECA) program and has an on-going program for co-production of hydrogen. Future development in these technologies can lead to future coal gas fuel cell applications.

FuelCell Energy

2005-05-16T23:59:59.000Z

83

Grays Harbor Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Name Grays Harbor Demonstration Project Facility Grays Harbor Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Grays Harbor Ocean Energy Company LLC Developer Grays Harbor Ocean Energy Company LLC Location Pacific Ocean Coordinates 46.858°, -124.187° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.858,"lon":-124.187,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

84

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

85

NETL: News Release - Milestone Project Demonstrates Innovative...  

NLE Websites -- All DOE Office Websites (Extended Search)

the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL), WE Energies demonstrated the TOXECON(TM) process in a 52.9million project at the Presque...

86

Smart Grid Demonstration Project Locations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Demonstration Project Locations Smart Grid Demonstration Project Locations Map of the United States showing the location of Smart Grid Demonstration projects created...

87

3M's Motor Challenge Showcase Demonstration Project  

E-Print Network (OSTI)

In January 1994, 3M began the task of optimizing the electric motor systems at 3M Center, a 26 building, 7 million square foot corporate campus. A cross-functional, cross-company team was established which included four 3M employees representing two different departments within 3M, an engineer specializing in demand side management programs from Northern States Power Company, and a sales engineer from General Electric Supply Company. The team was later joined by an engineering specialist from Landis & Staefa, Inc., a building automation controls supplier. The team began the task of identifying the projects that could save energy and provide a reasonable return on 3M's investment on a building by building approach. As surveys were completed, proposals were prepared and presented to management requesting funding. The team continued the process of identifying projects in remaining buildings and took on the responsibility of designing, contracting and implementing projects as funding was approved for those already studied. Follow-up measurements to ascertain that the savings predicted was actually achieved are done before project close-out. This project was submitted and accepted as a Motor Challenge Showcase Demonstration Project. The Motor Challenge is a U.S. Department of Energy initiative to promote the efficient use of energy in electric motor systems. Showcase Demonstration Projects are used to exemplify the benefits that motor system optimization can provide. This Showcase Project is different from most as it emphasizes the process that was developed to carry out a project of this magnitude rather than any single specific technologies or applications. The team has completed the project at 3M Center. Measured savings are $823,000 per year. This paper will discuss the Motor Challenge Showcase Demonstration project that was completed at 3M Center, the motor systems survey methodology the team developed, analysis tools and techniques and the results that have been attained.

Schultz, S. C.

1998-04-01T23:59:59.000Z

88

LIMB Demonstration Project Extension and Coolside Demonstration. [Final report  

SciTech Connect

This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

Goots, T.R.; DePero, M.J.; Nolan, P.S.

1992-11-10T23:59:59.000Z

89

IGCC Dynamic Simulator and Training Center  

SciTech Connect

Integrated Gasification Combined Cycle (IGCC) is emerging as the technology of choice for providing clean, low-cost electricity for the next generation of coal-fired power plants and will play a central role in the development of high-efficiency, zero-emissions power plants such as FutureGen. Several major utilities and developers recently announced plans to build IGCC plants and other major utilities are evaluating IGCCs suitability for base-load capacity additions. This recent surge of attention to IGCC power generation is creating a growing demand for experience with the analysis, operation, and control of commercial-scale IGCC plants. To meet this need, the National Energy Technology Laboratory (NETL) has launched a project to develop a generic, full-scope, IGCC dynamic plant simulator for use in establishing a state-of-the-art simulator training center at West Virginia Universitys (WVU) National Research Center for Coal and Energy (NRCCE). The IGCC Dynamic Simulator & Training (DS&T) Center will be established under the auspices of the Collaboratory for Process & Dynamic Systems Modeling (Collaboratory) organized between NETL, WVU, the University of Pittsburgh, and Carnegie Mellon University.

Zitney, S.E.; Erbes, M.R. (Enginomix, LLC)

2006-10-01T23:59:59.000Z

90

3M's Motor Challenge Showcase Demonstration Project  

E-Print Network (OSTI)

In January 1994, 3M began the task of optimizing the electric motor systems at 3M Center, a 26 building, 7 million square foot corporate campus. A cross-functional, cross-company team was established which included four 3M employees representing two different departments within 3M, an engineer specializing in demand side management programs from Northern States Power Company, and a sales engineer from General Electric Supply Company. The team was later joined by an engineering specialist from Landis & Gyr, Inc., a building automation controls supplier. The team began the task of identifying the projects that could save energy and provide a reasonable return on 3M's investment on a building by building approach. As surveys were completed, proposals were prepared and presented to management requesting funding. The team continued the process of identifying projects in remaining buildings and took on the responsibility of designing, contracting and implementing projects as funding was approved for those already studied. Follow-up measurements to ascertain that the savings predicted was actually achieved are done before project close-out. This project was submitted and has been accepted as a Motor Challenge Showcase Demonstration Project. The Motor Challenge is a U. S. Department of Energy initiative to promote the efficient use of energy in electric motor systems. Showcase Demonstration Projects are used to exemplify the benefits that motor system optimization can provide. This Showcase Project is different from most as it emphasizes the process that was developed to carry out a project of this magnitude rather than any single specific technologies or applications. The team has nearly completed the studies at 3M Center and is well into the implementation phase with six buildings being complete. Savings identified to date are approximately $810,000 per year. This paper will discuss the Motor Challenge Showcase Demonstration project currently underway at 3M Center, the motor systems survey methodology the team developed, analysis tools and techniques and the results that have been attained.

Schultz, S. C.

1996-04-01T23:59:59.000Z

91

Western Greenbrier Co-Production Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

92

Utilities split on readiness of IGCC  

SciTech Connect

For some generating companies, the dearth of operating experience for integrated gasification combined-cycle plants adds too much uncertainty to the risk/reward equation for new-capacity technology options. For others, the possibility of being able to comply with air pollution limits as far out as 2018, as well as to meet all-but-certain CO{sub 2} caps, makes IGCC well worth investing in now. The article compares the highest-level technical and economic characteristics of IGCC with those of pulverised coal combustion and other generating technologies. It then discusses the availability histories of six successful IGCC demonstration plants, presenting that for the Wabash River plant in some detail. The issue of financing IGCC is addressed. An insert on page 58 summarises a paper by Dave Stopek of Sangent and Lundy presented at Electric Power 2006. This discussed IGCC plant cost and factors to consider in selecting a technology supplier. 1 fig., 4 tabs.

Javetski, J.

2006-10-15T23:59:59.000Z

93

Pecan Street Project, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Project, Inc. Smart Grid Demonstration Project Project, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Pecan Street Project, Inc. Country United States Headquarters Location Austin, Texas Recovery Act Funding $10,403,570.00 Total Project Value $24,656,485.00 Coordinates 30.267153°, -97.7430608° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

94

Hydrogen Production from Hydrogen Sulfide in IGCC Power Plants  

SciTech Connect

IGCC power plants are the cleanest coal-based power generation facilities in the world. Technical improvements are needed to help make them cost competitive. Sulfur recovery is one procedure in which improvement is possible. This project has developed and demonstrated an electrochemical process that could provide such an improvement. IGCC power plants now in operation extract the sulfur from the synthesis gas as hydrogen sulfide. In this project H{sub 2}S has been electrolyzed to yield sulfur and hydrogen (instead of sulfur and water as is the present practice). The value of the byproduct hydrogen makes this process more cost effective. The electrolysis has exploited some recent developments in solid state electrolytes. The proof of principal for the project concept has been accomplished.

Elias Stefanakos; Burton Krakow; Jonathan Mbah

2007-07-31T23:59:59.000Z

95

Advanced Coal Conversion Process Demonstration (Project)  

DOE Green Energy (OSTI)

This report contains a description of technical progress made on the Advanced Coal Conversion Process Demonstration Project (ACCP). The project is a US Department of Energy Innovative Clean Coal Technology Project. The cooperative agreement defining the project is between DOE and the Rosebud SynCoal Partnership RSCP. The RSCP is a partnership between Western Energy Company (WECo), a subsidiary of Entech, Montana Power's non-utility group, and NRG, a subsidiary of Northern States Power. The ACCP is a method of upgrading low ranked coals by reducing the moisture and sulfur content and increasing the heating value. The facility is being constructed at WECo's Rosebud No. 6 coal mine, west of Colstrip, Montana. This report contains both a history of the process development and a report of technical progress made since the beginning of the Clean Coal 1 cooperative agreement.

Not Available

1991-07-01T23:59:59.000Z

96

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

Science Conference Proceedings (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (4) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (5) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Detailed studies of LTV's site for the installation of the commercial Demonstration Unit with site specific layouts; Environmental Work; Firm commitments for funding from the private sector; and Federal funding to complement the private contribution.

Albert Calderon

1999-06-23T23:59:59.000Z

97

Demonstration Development Project: Large-Scale Post-Combustion CO2 Capture Retrofit Demonstration Project Review  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has reviewed proposed demonstration sites for retrofitting post-combustion CO2 capture onto an existing coal-fired plant. This report discusses and reviews this set of demonstration projects to provide background information and the rationale for EPRI to pursue being involved in one or more of these projects.

2010-12-17T23:59:59.000Z

98

Category:Smart Grid Projects - Regional Demonstrations | Open Energy  

Open Energy Info (EERE)

Demonstrations Demonstrations Jump to: navigation, search Smart Grid Regional Demonstrations Projects category. Pages in category "Smart Grid Projects - Regional Demonstrations" The following 16 pages are in this category, out of 16 total. B Battelle Memorial Institute, Pacific Northwest Division Smart Grid Demonstration Project C Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Columbus Southern Power Company (doing business as AEP Ohio) Smart Grid Demonstration Project Consolidated Edison Company of New York, Inc. Smart Grid Demonstration Project K Kansas City Power & Light Company Smart Grid Demonstration Project L Long Island Power Authority Smart Grid Demonstration Project L cont. Los Angeles Department of Water and Power Smart Grid Demonstration Project

99

CoalFleet RD&D augmentation plan for integrated gasification combined cycle (IGCC) power plants  

SciTech Connect

To help accelerate the development, demonstration, and market introduction of integrated gasification combined cycle (IGCC) and other clean coal technologies, EPRI formed the CoalFleet for Tomorrow initiative, which facilitates collaborative research by more than 50 organizations from around the world representing power generators, equipment suppliers and engineering design and construction firms, the U.S. Department of Energy, and others. This group advised EPRI as it evaluated more than 120 coal-gasification-related research projects worldwide to identify gaps or critical-path activities where additional resources and expertise could hasten the market introduction of IGCC advances. The resulting 'IGCC RD&D Augmentation Plan' describes such opportunities and how they could be addressed, for both IGCC plants to be built in the near term (by 2012-15) and over the longer term (2015-25), when demand for new electric generating capacity is expected to soar. For the near term, EPRI recommends 19 projects that could reduce the levelized cost-of-electricity for IGCC to the level of today's conventional pulverized-coal power plants with supercritical steam conditions and state-of-the-art environmental controls. For the long term, EPRI's recommended projects could reduce the levelized cost of an IGCC plant capturing 90% of the CO{sub 2} produced from the carbon in coal (for safe storage away from the atmosphere) to the level of today's IGCC plants without CO{sub 2} capture. EPRI's CoalFleet for Tomorrow program is also preparing a companion RD&D augmentation plan for advanced-combustion-based (i.e., non-gasification) clean coal technologies (Report 1013221). 7 refs., 30 figs., 29 tabs., 4 apps.

2007-01-15T23:59:59.000Z

100

Session 9: Heber Geothermal Binary Demonstration Project  

DOE Green Energy (OSTI)

The Heber Binary Project had its beginning in studies performed for the Electric Power Research Institute (EPRI), which identified the need for commercial scale (50 Mw or larger) demonstration of the binary cycle technology. In late 1980, SDG&E and the Department of Energy (DOE) signed a Cooperative Agreement calling for DOE to share in 50 percent of the Project costs. Similarly, SDG&E signed Project participation agreements with EPRI, the Imperial Irrigation District, California Department of Water Resources, and Southern California Edison Company, which provided the remaining 50 percent of the required funding. In 1982, the State of California also joined the Project. The objectives of the Heber Binary Project are to demonstrate the potential of moderate-temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology, and to establish schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants. The plant will be the first large-scale power generating facility in the world utilizing the binary conversion process, and it is expected that information resulting from this Project will be applicable to a wide range of moderate-temperature hydrothermal reservoirs, which represent 80 percent of geothermal resources in the United States. To accomplish the plant engineering, design, and equipment procurement, SDG&E has hired Fluor Engineers, Inc., Power Division, of Irvine, California. In early 1982, SDG&E contracted for construction management services with Dravo Constructors, Inc. (DCI) of New York. DCI is responsible for casting the Fluor design into construction packages, letting the construction contracts, and overseeing the construction in the field.

Allen, Richard F.; Nelson, Tiffany T.

1983-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

Science Conference Proceedings (OSTI)

The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

Not Available

1992-02-01T23:59:59.000Z

102

Duke Energy Notrees Wind Storage Demonstration Project  

Science Conference Proceedings (OSTI)

This EPRI technical update is an interim report summarizing the status of Duke Energys Notrees Wind Storage Demonstration Project, which involves integrating a 36-MW battery energy storage system (BESS) from Xtreme Power with the 152.6-MW Notrees Wind Farm. Xtreme Powers solid lead-acid battery represents one of an emerging number of energy storage devices endowed with the potential to serve multiple ...

2012-12-12T23:59:59.000Z

103

All-Electric Wendy's Restaurant Demonstration Project  

Science Conference Proceedings (OSTI)

How well can the power needs of a small restaurant be met by an all-electric solution? This demonstration project at a fast-food restaurant investigated the energy and economic performance of a suite of high-efficiency electro-technologies including an all-electric cookline; high efficiency lighting; and heat pumps for water heating, space heating, and cooling. The all-electric concept proved to be competitive with the more conventional gas/electric model.

1999-09-16T23:59:59.000Z

104

Demonstration project Smart Charging (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

project Smart Charging (Smart Grid Project) project Smart Charging (Smart Grid Project) Jump to: navigation, search Project Name Demonstration project Smart Charging Country Netherlands Headquarters Location Noord-Brabant, Netherlands Coordinates 51.482655°, 5.232169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.482655,"lon":5.232169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

Microsoft Word - 41889_GE_IGCC System Study_Factsheet_Rev01_07-20-04.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet: Fact Sheet: "System Study For Improved Gas Turbine Performance For Coal IGCC Application" DOE Contract No: DE-FC26-03NT41889 I Project Description: A. Objective: This study will identify improvements in gas turbine performance for coal Integrated Gasification Combined Cycle (IGCC) application. The study will identify vital gas turbine parameters and quantify their influence in meeting the DOE Turbine Program overall IGCC plant goals of 50% net HHV efficiency, $1000/kW capital cost, and low emissions. Focus will be on air-cooled gas turbines for near-term operation in coal fed oxygen blown IGCC power plants with commercially demonstrated gasification, gas cleaning, & air separation technologies. A roadmap towards achieving DOE's goals for

106

Heat Pump Water Heaters Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heat Pump Water Heaters Heat Pump Water Heaters Demonstration Project Building America Stakeholder Meeting Ron Domitrovic Ammi Amarnath 3/1/2012 Austin, TX 2 © 2011 Electric Power Research Institute, Inc. All rights reserved. HPWH Field Demonstration: Research Objectives * Assess heat pump water heater technology by measuring efficiency. * Provide credible data on the performance and reliability of heat pump water heaters. * Assess user satisfaction in a residential setting. 3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Demonstration Host Utilities Target: 40 Units per Utility Installed and Potential Sites by Climate Zone Source: Department of Energy (DOE), Building America climate regions 4 © 2011 Electric Power Research Institute, Inc. All rights reserved. Installation Locations-Southern Company Region

107

Newberry EGS Demonstration Project Environmental Analysis (EA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newberry Volcano Enhanced Geothermal System (EGS) Demonstration Project UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT (BLM) DOI-BLM-OR-P000-2011-0003-EA DOE/EA-1897 ENVIRONMENTAL ASSESSMENT DECEMBER 2011 Location: Federal Geothermal Leases on the West Flank of Newberry Volcano, Deschutes County, 22 miles south of Bend, Oregon Applicant: Davenport Newberry Holdings LLC and AltaRock Energy, Inc. 225 NW Franklin Avenue, Suite 1 Bend, OR 97701 Tel: 541-323-1190 Lead Agency: U.S. Department of the Interior,

108

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

Science Conference Proceedings (OSTI)

This project deals with the demonstration of a coking reactor (Process Development Unit-- PDU-11) using Calderon's proprietary technology for making commercially acceptable coke. The activities of the past quarter were focused on the following: 1. Testing and Designing of the Submerged Quenching Closed System for the Process; 2. Usage of the Cracked Desulfurized Gas as a Reducing Gas to Make Directly Reduced Iron (DRI) in Order to Make the Process Economics Viable; 3. Changes in the Ceramic Liners for Supporting Them in the Coking Reactor; 4. Work Towards Testing of U.S. Steel's Coal in the Existing Process Development Unit in Alliance (PDU-1); 5. Permitting.

Albert Calderon

1998-04-08T23:59:59.000Z

109

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments Comments Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement Clark County Public Library Winchester, KY Page 1 of 5 D-1 Comment No. 1 Issue Code: 11 Gasification is different from incineration. It is a better, more environmentally responsible approach to generating energy from the use of fossil fuels and refuse derived fuel (RDF). Incineration produces criteria pollutants, semi-volatile and volatile organic compounds and dioxin/furan compounds. Ash from hazardous waste incinerators is considered a hazardous waste under the Resource Conservation and Recovery Act (RCRA). In contrast, gasification, which occurs at high temperatures and pressures, produces no air emissions, only small amounts of wastewater containing salts. Synthesis gas (syngas)

110

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 SUMMARY The U.S. Department of Energy (DOE) prepared this environmental impact statement (EIS) on the proposed Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project in compliance with the National Environmental Policy Act (NEPA). The National Environmental Policy Act Process NEPA is a federal law that serves as the basic national charter for protection of the environment. For major federal actions that may significantly affect the quality of the environment, NEPA requires federal agencies to prepare a detailed statement that includes the potential environmental impacts of the Proposed Action and reasonable alternatives. A fundamental objective of NEPA is to foster better decisionmaking by ensuring that high quality environmental information is available to public officials and members of the

111

Nucla circulating atmospheric fluidized bed demonstration project  

Science Conference Proceedings (OSTI)

Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

Not Available

1991-10-01T23:59:59.000Z

112

Landfill Gas-to-Electricity Demonstration Project  

DOE Green Energy (OSTI)

Medium Btu methane gas is a naturally occurring byproduct of anaerobic digestion of landfilled municipal solid waste. The energy potential of landfill gas in New York State is estimated to be 61 trillion Btu's per year or the equivalent of 10% of the natural gas used annually in the state. The 18-month Landfill Gas-to-Electricity Demonstration Project conducted at the Fresh Kills Landfill in Staten Island, New York conclusively demonstrated that landfill gas is an acceptable fuel for producing electricity using an internal combustion engine/generator set. Landfill gas proved to be a reliable and consistent fuel source during a six-month field test program. Engine exhaust emissions were determined to be comparable to that of natural gas and no unusually high corrosion rates on standard pipeline material were found.

Not Available

1982-10-01T23:59:59.000Z

113

MHK Projects/Pulse Stream 100 Demonstration Project | Open Energy  

Open Energy Info (EERE)

Pulse Stream 100 Demonstration Project Pulse Stream 100 Demonstration Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.6405,"lon":-0.16257,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

114

Category:Smart Grid Projects - Energy Storage Demonstrations | Open Energy  

Open Energy Info (EERE)

Energy Storage Demonstrations Energy Storage Demonstrations Jump to: navigation, search Smart Grid Energy Storage Demonstration Projects category. Pages in category "Smart Grid Projects - Energy Storage Demonstrations" The following 16 pages are in this category, out of 16 total. 4 44 Tech Inc. Smart Grid Demonstration Project A Amber Kinetics, Inc. Smart Grid Demonstration Project B Beacon Power Corporation Smart Grid Demonstration Project C City of Painesville Smart Grid Demonstration Project D Duke Energy Business Services, LLC Smart Grid Demonstration Project E East Penn Manufacturing Co. Smart Grid Demonstration Project K Ktech Corporation Smart Grid Demonstration Project N New York State Electric & Gas Corporation Smart Grid Demonstration Project P Pacific Gas & Electric Company Smart Grid Demonstration Project

115

Brown Grease to Biodiesel Demonstration Project Report  

Science Conference Proceedings (OSTI)

Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional resource recovery centers. This view is a direct result of increasingly stringent regulations, concerns over energy use, carbon footprint, and worldwide depletion of fossil fuel resources. Resources in wastewater include chemical and thermal energy, as well as nutrients, and water. A waste stream such as residual grease, which concentrates in the drainage from restaurants (referred to as Trap Waste), is a good example of a resource with an energy content that can be recovered for beneficial reuse. If left in wastewater, grease accumulates inside of the wastewater collection system and can lead to increased corrosion and pipe blockages that can cause wastewater overflows. Also, grease in wastewater that arrives at the treatment facility can impair the operation of preliminary treatment equipment and is only partly removed in the primary treatment process. In addition, residual grease increases the demand in treatment materials such as oxygen in the secondary treatment process. When disposed of in landfills, grease is likely to undergo anaerobic decay prior to landfill capping, resulting in the atmospheric release of methane, a greenhouse gas (GHG). This research project was therefore conceptualized and implemented by the San Francisco Public Utilities Commission (SFPUC) to test the feasibility of energy recovery from Trap Waste in the form of Biodiesel or Methane gas. The research goals are given below: ?¢???¢ To validate technology performance; ?¢???¢ To determine the costs and benefits [including economic, socioeconomic, and GHG emissions reduction] associated with co-locating this type of operation at a municipal wastewater treatment plant (WWTP); ?¢???¢ To develop a business case or model for replication of the program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP?¢????s anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project?¢????s environmental impacts were expected to include: ?¢???¢ Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biod

San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

2013-01-30T23:59:59.000Z

116

Property:Did The Test Results Demonstrate Projected Performance...  

Open Energy Info (EERE)

Did The Test Results Demonstrate Projected Performance? Jump to: navigation, search Property Name Did The Test Results Demonstrate Projected Performance? Property Type Text...

117

The Southern California Conversion Technology Demonstration Project | Open  

Open Energy Info (EERE)

The Southern California Conversion Technology Demonstration Project The Southern California Conversion Technology Demonstration Project Jump to: navigation, search Tool Summary Name: The Southern California Conversion Technology Demonstration Project Agency/Company /Organization: The Southern California Conversion Technology Demonstration Project Sector: Energy, Land Focus Area: - Waste to Energy Phase: Create a Vision Resource Type: Publications User Interface: Website Website: www.socalconversion.org/resources.html Cost: Free The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L. A. County. Overview The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L.

118

DOE Funds 21 Research, Development and Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development and Demonstration Projects for up to 78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to 78...

119

Smart Grid Regional and Energy Storage Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional and Energy Storage Demonstration Projects: Awards Smart Grid Regional and Energy Storage Demonstration Projects: Awards List of Smart Grid Regional and Energy Storage...

120

Coalfleet IGCC Permits Database  

Science Conference Proceedings (OSTI)

The CoalFleet IGCC Permits Database presents comprehensive information on permitting requirements and permit conditions for Integrated Gasification Combined Cycle (IGCC) power plants in an online database format. This Technical Update is a compilation of the Database contents as of April 1, 2009.

2009-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

High-Temperature Superconductivity Cable Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Temperature Temperature Superconductivity Cable Demonstration Projects Superconductivity Power Equipment www.oe.energy.gov Phone: 202-586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585. Plugging America Into the Future of Power "A National Effort to Introduce New Technology into the Power Delivery Infrastructure" "In order to meet President Obama's ambitious energy goals, we must modernize the nation's electrical grid to improve the transmission, storage and reliability of clean energy across the country and help to move renewable energy from the places it can be produced to the places it can be used. The Department of Energy is working with industry partners to develop the

122

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

DOE Green Energy (OSTI)

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

123

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

SciTech Connect

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

124

Wave Power Demonstration Project at Reedsport, Oregon  

SciTech Connect

Ocean wave power can be a significant source of large?scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy? to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high?voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon?based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take?off subsystem are complete; additionally the power take?off subsystem has been successfully integrated into the spar.

Mekhiche, Mike [Principal Investigator] [Principal Investigator; Downie, Bruce [Project Manager] [Project Manager

2013-10-21T23:59:59.000Z

125

PFBC Utility Demonstration Project. Annual report, 1991  

Science Conference Proceedings (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

126

The Way Ahead - West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update Update Project Update The Way Ahead The Way Ahead West Valley Demonstration Project Not to be Considered as a Regulatory Submittal Pre-decisional Draft 19817_1 The Way Ahead The Way Ahead Bryan Bower, DOE Director HLW Corporate Board October 6, 2008 FY 2008 Accomplishments Safety Performance Planned vs Actual 2.1 2.3 2 2 2.3 1.9 1.9 1.5 2 2.5 Actual Performance 1 Million Hours (9/3/08) 2007 DOE complex avg. TRC Safety Performance Planned vs Actual 2.1 2.3 2 2 2.3 1.9 1.9 1.5 2 2.5 Actual Performance 1 Million Hours (9/3/08) 2007 DOE complex avg. TRC One Million One Million Safe Work Hours! Safe Work Hours! TRC 0.5 DART 0.0 No lost-time injuries in FY 2008 Not to be Considered as a Regulatory Submittal Pre-decisional Draft 19817_2 0 0.0 0.0 0.0 0.0 0.0 1.4 1.4 1.4 1.4 0.8 0.3 0.3 0.3 1.2 1.2 1.3 1.3 1.0 0.8 0.8 0.3 0.3 0.3 0.3 0 0.5 1 Sep -07 O ct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Ju n-08

127

Getting IGCC a seat at the table  

SciTech Connect

A dominant theme at the Gasification Technologies Conference in Washington, DC in early October was how all parties need to step up to assure integrated gasification combined cycle (IGCC) technology finds a place at the power generation table. That included a call for utilities and their ratepayers to be willing to accept more risk than they are accustomed to assuming. John Hofmeister, president and CEO of Shell Oil Company chided lawmakers and regulators for hindering progress by not adopting uniform regulations for carbon dioxide emissions. Among Shell's IGCC projects is Australia's equivalent of the United States' FutureGen Project - a 275 MW power production facility in Queensland that is expected to achieve 99.8% CO{sub 2} capture with sequestration and produce hydrogen. Randy Zwirn, president nd CEO of Siemens Power Generation, said OEMs must develop a philosophy for IGCC that he terms RAM - reliability, availability and maintainability. Texas Railroad Commissioner, Mike Williams described how his state has welcomed IGCC plants that can capture carbon and has established the groundwork for using or sequestrating it. Presentations reviewed in this article include status updates of more than a dozen IGCC projects underway. 1 photo.

Blankinship, S.

2006-11-15T23:59:59.000Z

128

WSF Biodiesel Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

In 2004, WSF canceled a biodiesel fuel test because of product quality issues that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

2009-04-30T23:59:59.000Z

129

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Draft Environmental Impact Statement  

DOE Green Energy (OSTI)

The Kentucky Pioneer IGCC Demonstration Project DEIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared financial support for construction and operation of an electrical power station demonstrating use of a Clean Coal Technology in Clark County, Kentucky. Under the Proposed Action, DOE would provide financial assistance, through a Cooperative Agreement with Kentucky Pioneer Energy, LLC, for design, construction, and operation of a 540 megawatt demonstration power station comprised of two synthesis gas-fired combined cycle units in Clark County, Kentucky. The station would also be comprised of a British Gas Lurgi (BGL) gasifier to produce synthesis gas from a co-feed of coal and refuse-derived fuel pellets and a high temperature molten carbonate fuel cell. The facility would be powered by the synthesis gas feed. The proposed project would consist of the following major components: (1) refuse-derived fuel pellets and coal receipt and storage facilities; (2) a gasification plant; (3) sulfur removal and recovery facilities; (4) an air separation plant; (5) a high-temperature molten carbonate fuel cell; and (6) two combined cycle generation units. The IGCC facility would be built to provide needed power capacity to central and eastern Kentucky. At a minimum, 50 percent of the high sulfur coal used would be from the Kentucky region. Two No Action Alternatives are analyzed in the DEIS. Under the No Action Alternative 1, DOE would not provide cost-shared funding for construction and operation of the proposed facility and no new facility would be built. Under the No Action Alternative 2, DOE would not provide any funding and, instead of the proposed demonstration project, Kentucky Pioneer Energy, LLC, a subsidiary of Global Energy, Inc., would construct and operate, a 540 megawatt natural gas-fired power station. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, and environmental justice were included in the assessment.

N /A

2001-11-16T23:59:59.000Z

130

Pilot scale experience on IGCC hot gas cleanup  

SciTech Connect

In September 1993 Enviropower Inc. entered into a Cooperative Research and Development Agreement (CRADA) with the Department of Energy in order to develop and demonstrate the major components of an IGCC process such as hot gas cleanup systems. The objectives of the project are to develop and demonstrate: (1) hydrogen sulfide removal using regenerable metal oxide sorbent in pressurized fluidized bed reactors, (2) recovery of elemental sulfur from the tail-gas of the sorbent regenerator, and (3) hot gas particulate removal using ceramic candle filters.

Salo, K.; Ghazanfari, R.; Feher, G. [and others

1995-11-01T23:59:59.000Z

131

Small-Scale Hydroelectric Power Demonstration Project  

DOE Green Energy (OSTI)

The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

Gleeson, L.

1991-12-01T23:59:59.000Z

132

Integrated gasification combined-cycle research development and demonstration activities  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) has selected six integrated gasification combined-cycle (IGCC) advanced power systems for demonstration in the Clean Coal Technology (CCT) Program. DOE`s Office of Fossil Energy, Morgantown Energy Technology Center, is managing a research development and demonstration (RD&D) program that supports the CCT program, and addresses long-term improvements in support of IGCC technology. This overview briefly describes the CCT projects and the supporting RD&D activities.

Ness, H.M.; Reuther, R.B.

1995-12-01T23:59:59.000Z

133

Making IGCC slag valuable  

SciTech Connect

All indications are that integrated gasification combined-cycle (IGCC) technology will play a major role in tomorrow's generation industry. But before it does, some by-products of the process must be dealt with, for example unburned carbon that can make IGCC slag worthless. Charah Inc.'s processing system, used at Tampa Electric's Polk Station for years, segregates the slag's constituents by size, producing fuel and building materials. 3 figs.

Wicker, K.

2005-12-01T23:59:59.000Z

134

Water and Wastewater Technology Demonstration Projects  

Science Conference Proceedings (OSTI)

This project was funded jointly by the Electric Power Research Institute (EPRI), Southern California Edison (SCE), and the California Energy Commission (CEC), with project management by SCE. The primary objective was to identify and develop technologies that could help California's water/wastewater industry reduce the cost of water and wastewater treatment and improve the overall operation at treatment facilities. Metropolitan Water District (MWD) and Orange County Water District (OCWD) were commissioned...

2002-07-15T23:59:59.000Z

135

Dynamic simulation for IGCC process and control design  

Science Conference Proceedings (OSTI)

Detailed dynamic simulation analysis is a valuable tool that increases the understanding of unit interactions and control system performance in a complex integrated gasification combined-cycle (IGCC) plant. The Sarlux integrated gasification combined cycle (IGCC) plant must simultaneously satisfy electrical power and refinery hydrogen and steam demands (trigeneration gasification). The plant`s gasifier, heat recovery, sulfur removal, hydrogen recovery and steam power generation units are highly integrated and require coordinated control. In this study, dynamic simulation provides insights into the behavior of the process and combined cycle units during normal and upset conditions. The dynamic simulation is used to design a control system that drives the gasifiers to satisfy power, steam and hydrogen demands before a load change or upset is detected by the syngas pressure controller. At the study conclusion, the model will demonstrate how the IGCC plant will respond to the contractual maximum load change rate and process upsets. The study tests the basic process and control system design during the project engineering phase to minimize startup troubleshooting and expensive field changes.

Depew, C.; Martinez, A. [Fluor Daniel, Irvine, CA (United States); Collodi, G.; Meloni, R. [Snamprogetti, Milan (Italy)

1998-01-01T23:59:59.000Z

136

NETL: Clean Coal Demonstrations - Project Performance Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Deepwater Technology Enhanced Oil Recovery Gas Hydrates Natural Gas Resources Contacts Coal & Power Systems Major Demonstrations Innovations for Existing Plants Gasification...

137

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2010.

Wipke, K.; Spirk, S.; Kurtz, J.; Ramsden, T.

2010-09-01T23:59:59.000Z

138

Project Green Thumb: A Demonstration in Wisconsin  

Science Conference Proceedings (OSTI)

A prototype of NOAA's proposed Green Thumb agricultural information dissemination system was demonstrated at five different sites across Wisconsin during the period JulyOctober 1979. Those viewing the system were asked to complete questionnaires ...

David Suchman

1980-04-01T23:59:59.000Z

139

West Valley Demonstration Project Phase I Decommissioning - Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Phase I Decommissioning - Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement The Department of Energy, West Valley Demonstration Project (DOE-WVDP) and CH2M Hill B&W West Valley (CHBWV) are committed to continuous improvement and will utilize principles of the DOE Environmental Management (DOE-EM) Partnering Policy to create and foster a team environment to successfully complete the West Valley Demonstration Project (WVDP) Phase I Decommissioning - Faciltiy Disposition. West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement More Documents & Publications CX-009527: Categorical Exclusion Determination

140

Utility Scale Wind turbine Demonstration Project  

SciTech Connect

The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

Terry Fredericks

2006-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

The abundance of coal in the United States makes it one of our Nation's most important strategic resources in building a secure energy future. With today's prices and technology, recoverable reserves located in the United States could supply the Nation's coal consumption for approximately 250 years at current usage rates. However, if coal is to reach its full potential as an environmentally acceptable source of energy, an expanded menu of advanced clean coal technologies must be developed to provide substantially improved options both for the consumer and private industry. Before any technology can be seriously considered for commercialization, it must be demonstrated at a sufficiently large-scale to develop industry confidence in its technical and economic feasibility. The implementation of a federal technology demonstration program is the established means of accelerating the development of technology to meet national energy strategy and environmental policy goals, to reduce the risk to human health and the environment to an acceptable level, to accelerate commercialization, and to provide the incentives required for continued activity in research and development directed at providing solutions to long-range energy problems. The U.S. Department of Energy (DOE) prepared this environmental impact statement (EIS) on the proposed Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project in compliance with the National Environmental Policy Act (NEPA).

N /A

2002-12-13T23:59:59.000Z

142

East Penn Manufacturing Co. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Manufacturing Co. Smart Grid Demonstration Project Manufacturing Co. Smart Grid Demonstration Project Jump to: navigation, search Project Lead East Penn Manufacturing Co. Country United States Headquarters Location Lyon Station, Pennsylvania Recovery Act Funding $2,245,523.00 Total Project Value $4,491,046.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The East Penn Manufacturing Co. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in Lyon Station, Pennsylvania. Overview Demonstrate the economic and technical viability of a 3MW grid-scale, advanced energy storage system using the lead-carbon UltraBattery technology to regulate frequency and manage energy demand. This project

143

Newberry Volcano EGS Demonstration Geothermal Project | Open Energy  

Open Energy Info (EERE)

Volcano EGS Demonstration Geothermal Project Volcano EGS Demonstration Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Newberry Volcano EGS Demonstration Project Type / Topic 1 Recovery Act: Enhanced Geothermal System Demonstrations Project Type / Topic 2 EGS Demonstration Project Description The project will demonstrate EGS power generation from the Newberry Known Geothermal Resource Area ("Newberry"). Four deep, high temperature, very low permeability, production-size wells have been completed at Newberry, including two currently owned by Davenport. The Newberry project site exemplifies unparalleled EGS potential in the United States, with a large, high-temperature, conductive thermal anomaly yielding wells with permeability orders of magnitude less than conventional hydrothermal wells.

144

Operational results of National Solar Demonstration Projects  

Science Conference Proceedings (OSTI)

Included in the National Solar Demonstration Program are examples of earth-sheltered, passive solar designs. The data obtained from these sites presents an interesting look at what is both technically and economically feasible. Data from four demonstration sites that are members of the National Solar Data Network are utilized to present an economic and technical analyses of a group of four sites. Three of these sites are earth sheltered residential structures, the fourth is a commercial passive structure. This sample of four demonstration sites is not intended to provide a statistical representation of passive earth sheltered structures, but rather, an example of the type of information available through the National Solar Data Program and how this information may be utilized.

Waite, E.V.

1981-01-01T23:59:59.000Z

145

Dynamic Simulation and Training for IGCC Power Plants  

SciTech Connect

Integrated Gasification Combined Cycle (IGCC) is emerging as the technology of choice for providing clean, low-cost electricity for the next generation of coal-fired power plants and will play a central role in the development of high-efficiency, zero-emissions power plants such as FutureGen. Several major utilities and developers recently announced plans to build IGCC plants and other major utilities are evaluating IGCCs suitability for base-load capacity additions. This recent surge of attention to IGCC power generation is creating a growing demand for experience with the analysis, operation, and control of commercial-scale IGCC plants. To meet this need, the National Energy Technology Laboratory (NETL) has launched a project to develop a generic, full-scope, IGCC dynamic plant simulator for use in establishing a state-of-the-art simulator training center at West Virginia Universitys (WVU) National Research Center for Coal and Energy (NRCCE). The IGCC Dynamic Simulator & Training (DS&T) Center will be established under the auspices of the Collaboratory for Process & Dynamic Systems Modeling (Collaboratory) organized between NETL, WVU, the University of Pittsburgh, and Carnegie Mellon University.

Erbes, M.R. (Enginomix, LLC); Zitney, S.E

2006-09-01T23:59:59.000Z

146

Innovative Manufactured Housing Urban Design Demonstration Project  

Science Conference Proceedings (OSTI)

One quarter of the new houses sold in the United States in 1999 were manufactured homes, and manufactured housing represents an important and growing market for power producers. One niche market opportunity for manufactured homes is in urban areas. EPRI facilitated the completion of two limited demonstrations of energy efficient manufactured homes designed specifically for urban neighborhoods.

2000-10-05T23:59:59.000Z

147

Newberry EGS Demonstration Project Environmental Analysis (EA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

compl ex pathw ays, i s hi ghl y unl i kel y tracers w i l l be one of the onl y def i ni ti ve w ays to demonstrate communi cati on. 4 Suggested tracer analysis is...

148

Poland petroleum refinery sludge lagoon demonstration project  

SciTech Connect

The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern.

Altman, D.J.

2000-05-05T23:59:59.000Z

149

Nucla circulating atmospheric fluidized bed demonstration project  

Science Conference Proceedings (OSTI)

During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

Not Available

1991-01-31T23:59:59.000Z

150

Calderon Cokemaking Process/Demonstration Project  

Science Conference Proceedings (OSTI)

During this reporting period an agreement was entered into with Bechtel Corporation for design and construction of Calderon cokemaking facilities (see enclosed letter of February 28, 1997). A second agreement with Bechtel Enterprises to commercialize the Calderon technology as a worldwide business has progressed; during the forthcoming quarter, it is expected to have in place an agreement with Bechtel Enterprises (see attached letter of February 20, 1997). Thyssen Still Otto Anlagentechnik (TSOA), the world's largest builder of conventional cokemaking facilities indicated that it would be please to join Bechtel and Calderon in the demonstration and implementation of Calderon's cokemaking technology (see attached letter of January, 1997).

None

1998-04-08T23:59:59.000Z

151

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

Science Conference Proceedings (OSTI)

This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

Not Available

1991-01-01T23:59:59.000Z

152

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

SciTech Connect

The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association's Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

Not Available

1992-02-01T23:59:59.000Z

153

Site Programs & Cooperative Agreements: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration West Valley Demonstration Project Site Programs & Cooperative Agreements: West Valley Demonstration Project West Valley Demonstration Project The Seneca Nation of Indians has interests and concerns regarding the West Valley Demonstration Project Site. Like at Hanford, DOE environmental cleanup activities have the potential to impact natural and cultural resources and to interfere with American Indian religious practices. Through a cooperative agreement, tribal staff is engaged on a frequent basis with DOE and its contractors. The principle activities engaged by tribes include reviewing and commenting on plans and documents, participating in meetings at the request of DOE, monitoring cultural resource sites, participating in site surveys, and identifying issues that

154

Implementation of a Demonstration EGS Project at Naknek, Alaska...  

Open Energy Info (EERE)

Project Type Topic 2 EGS Demonstration Project Description NEA is about to begin drilling a deep, full-diameter well (Naknek-G 1, or simply G-1) that will be spudded in...

155

The United States of America and the People`s Republic of China experts report on integrated gasification combined-cycle technology (IGCC)  

SciTech Connect

A report written by the leading US and Chinese experts in Integrated Gasification Combined Cycle (IGCC) power plants, intended for high level decision makers, may greatly accelerate the development of an IGCC demonstration project in the People`s Republic of China (PRC). The potential market for IGCC systems in China and the competitiveness of IGCC technology with other clean coal options for China have been analyzed in the report. Such information will be useful not only to the Chinese government but also to US vendors and companies. The goal of this report is to analyze the energy supply structure of China, China`s energy and environmental protection demand, and the potential market in China in order to make a justified and reasonable assessment on feasibility of the transfer of US Clean Coal Technologies to China. The Expert Report was developed and written by the joint US/PRC IGCC experts and will be presented to the State Planning Commission (SPC) by the President of the CAS to ensure consideration of the importance of IGCC for future PRC power production.

1996-12-01T23:59:59.000Z

156

NETL: Clean Coal Demonstrations - Post-Project (DOE) Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Assessments DOE Assessments Clean Coal Demonstrations DOE Post-Project Assessments DOE Assessment of the Clean Coal Diesel Demonstration Project [PDF-590KB] DOE Assessment of the JEA Large-Scale CFB Combustion Demonstration Project [PDF-177KB] DOE Assessment of the Advanced Coal Conversion Process Demonstration [PDF-649KB] DOE Assessment of the Tampa Electric Integrated Gasification Combined-Cycle Demonstration Project [PDF-550KB] 500-MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal- Fired Boilers: A DOE Assessment [PDF-921KB] Commercial-Scale Demonstration of the Liquid Phase Methanol (LPMEOH™) Process [PDF-382KB] Healy Clean Coal Project: A DOE Assessment [PDF-713KB] Pulse Combustor Design: A DOE Assessment [PDF-569KB]

157

300kW Energy Storage Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kW Energy Storage Demonstration Project Technical Overview Presented at: Annual Doe Peer Review Meeting 2008 DOE Energy Storage & Power Electronics Research Programs By Ib I....

158

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project (Presentation)  

DOE Green Energy (OSTI)

This presentation, which provides information on the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, was given at the Fuel Cell Seminar in November 2004.

Garbak, J.; Gronich, S.; Wipke, K.; Welch, C.

2004-11-01T23:59:59.000Z

159

The role of Integrated Gasification Combined Cycle in the USDOE`s Clean Coal Research, Development and Demonstration Program  

SciTech Connect

For many years, the US Department of Energy (DOE) has been funding research, development, and demonstration (RD&D) projects to develop advanced power generation technologies. The goal of this activity is to catalyze the private sector to commercialize technologies that will provide reasonably priced electricity and still meet stringent environmental standards. Integrated Gasification Combined Cycle (IGCC) systems are emerging as one of the more attractive candidate technologies to meet this goal. The Morgantown Energy Technology Center (METC) has been assigned the responsibility for implementing IGCC projects in DOE`s Clean Coal RD&D program. The IGCC technology offers the potential for significant Improvements in environmental performance, compared to today`s coal-fired power plants. Sulfur dioxide and nitrogen oxide emissions from IGCC systems will be less than one-tenth of existing environmental standards. Thus, the IGCC technology will make coal-based plants as clean as plants that bum natural gas.

Bajura, R.A.; Schmidt, D.K.

1993-06-01T23:59:59.000Z

160

Toms Creek integrated gasification combined cycle demonstration project. Quarterly report, July 1--September 30, 1993  

SciTech Connect

The use of an upgraded version of General Electric`s Frame 6 gas turbine, which has been designated as Frame 6 (FA) will make a significant improvement to the thermal efficiency and overall economics of the Toms Creek Project. Replacing the smaller, less efficient Frame 6 (B) gas turbine with the new Frame 6 (FA) will increase the net power production from a nominal 55 MW to 105 MW. The coal feed rate will correspondingly increase from 430 tpd to 740 tpd. All process flows and equipment sizes will be increased accordingly. Selected process parameters for the original and revised Toms Creek IGCC plant configurations are compared in Table 2. There is an approximately 10% increase in net plant efficiency for the revised configuration. Using this increased plant size, the pressure vessels become larger due to an increased through-put, but are still dimensioned for shop fabrication and over-the-road shipment. The preliminary cost estimate for the enlarged demonstration plant was prepared by factoring the estimates for the original plant. Revised quotes for the larger equipment will be solicited and used to generate more accurate cost information for the revised plant.

Feher, G.

1993-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Integrated gasification combined-cycle research development and demonstration activities in the US  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE)`s Office of Fossil Energy, Morgantown Energy Technology Center, is managing a research development and demonstration (RD&D) program that supports the commercialization of integrated gasification combined-cycle (IGCC) advanced power systems. This overview briefly describes the supporting RD&D activities and the IGCC projects selected for demonstration in the Clean Coal Technology (CCT) Program.

Ness, H.M.; Brdar, R.D.

1996-09-01T23:59:59.000Z

162

Integrated gasification combined-cycle research development and demonstration activities in the U.S.  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) has selected seven integrated gasification combined-cycle (IGCC) advanced power systems for demonstration in the Clean Coal Technology (CCT) Program. DOE`s Office of Fossil Energy, Morgantown Energy Technology Center, is managing a research development and demonstration (RD&D)program that supports the CCT program, and addresses long-term improvements in support of IGCC technology. This overview briefly describes the CCT projects and the supporting RD&D activities.

Ness, H.M.

1994-12-31T23:59:59.000Z

163

Con Edison Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Con Edison Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable...

2009-09-16T23:59:59.000Z

164

ESB Networks Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the ESB Networks Smart Grid Demonstration Host-Site Project as part of EPRIs five-year Smart Grid demonstration initiative. The EPRI initiative includes core Smart Grid research and a number of large scale Smart Grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER) including demand response, storage, distributed generation, and distributed renewable generation into a virtual power plant to ...

2010-03-15T23:59:59.000Z

165

Exelon Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Exelon Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER) including demand response, storage, distributed generation, and distributed renewable gene...

2010-04-05T23:59:59.000Z

166

Duke Energy Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Duke Energy Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distributed...

2010-07-27T23:59:59.000Z

167

Southern Company Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Southern Company Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distri...

2010-07-27T23:59:59.000Z

168

PNM Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the PNM Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable genera...

2009-09-16T23:59:59.000Z

169

Independent Activity Report, West Valley Demonstration Project - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activity Report, West Valley Demonstration Project - Activity Report, West Valley Demonstration Project - November 2011 Independent Activity Report, West Valley Demonstration Project - November 2011 November 2011 West Valley Demonstration Project Orientation Visit [HIAR-WVDP-2011-11-07] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE West Valley Demonstration Project (WVDP) Office and the nuclear facility at West Valley, NY, on November 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and identify specific activities that HSS can perform to carry out its independent oversight

170

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need November 26, 2013 - 12:00pm Addthis Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteer John Schelble helps unload a delivery truck at a food pantry. Volunteer John Schelble helps unload a delivery truck at a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry.

171

Independent Activity Report, West Valley Demonstration Project - July 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project - West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West Valley Demonstration Project [HIAR WVDP-2012-07-30] The purpose of this Office of Health, Safety and Security (HSS) activity was for the HS-45 Site Lead to meet with Department of Energy (DOE) site personnel, tour the facilities, and obtain a status report on the upcoming activities at the West Valley Demonstration Project (WVDP). In the fall of 2011, a new contractor, CH2M Hill-B&W West Valley (CHBWV), was selected to perform site operations for Phase 1 decommissioning and facility disposition, including the Main Plant Process Building, the Low-Level Waste Treatment Facility, and other facilities.

172

IGCC Design and RAM Analysis for Near Zero Emissions  

Science Conference Proceedings (OSTI)

Concern over the continued availability of natural gas at competitive prices has led many power companies to initiate studies and projects on clean coal technologies as a strategic hedge against over-reliance on natural gas alone to provide future power needs. Integrated gasification combined cycle (IGCC) plants can meet very stringent emissions targets including those for mercury and carbon dioxide. Several years of commercial operation have been accumulated on coal-based IGCC plants in the United State...

2004-12-13T23:59:59.000Z

173

A utility`s perspective of the market for IGCC  

SciTech Connect

I believe, in the short-term U. S. market that IGCC`s primary competition is, natural gas-fired combined cycle technology. I believe that in order for IGCC to compete on a commercial basis, that natural gas prices have to rise relative to coal prices, and that the capital cost of the technology must come down. While this statement may seem to be somewhat obvious, it raises two interesting points. The first is that while the relative pricing of natural gas and coal is not generally within the technology supplier`s control, the capital cost is. The reduction of capital cost represents a major challenge for the technology suppliers in order for this technology to become commercialized. The second point is that the improvements being achieved with IGCC efficiencies probably won`t help it outperform the effects of natural gas pricing. This is due to the fact that the combined cycle portion of the IGCC technology is experiencing the most significant improvements in efficiency. I do see, however, a significant advantage for IGCC technology compared to conventional pulverized coal-fired units. As IGCC efficiencies continue to improve, combined with their environmentally superior performance, I believe that IGCC will be the ``technology of choice`` for utilities that install new coal-fired generation. We have achieved economic justification of our project by virtue of the DOE`s funding of $120 million awarded in Round III of their Clean Coal Technology Program. This program provides the bridge between current technology economics and those of the future. And Tampa Electric is pleased to be taking a leadership position in furthering the IGCC knowledge base.

Black, C.R. [Tampa Electric Co., FL (United States)

1993-08-01T23:59:59.000Z

174

Mercury Control Demonstration Projects Cover Photos: * Top: Limestone Power Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FEBRUARY 2008 6 FEBRUARY 2008 Mercury Control Demonstration Projects Cover Photos: * Top: Limestone Power Plant * Bottom left: AES Greenidge Power Plant * Bottom right: Presque Isle Power Plant A report on three projects conducted under separate cooperative agreements between the U.S. Department of Energy and: * Consol Energy * Pegasus Technologies * We Energies  Mercury Control Demonstration Projects Executive Summary ............................................................................ 4 Background ......................................................................................... 5 Mercury Removal Projects ................................................................ 7 TOXECON(tm) Retrofit For Mercury and Multi-Pollutant Control on Three 90-MW Coal-Fired Boilers ........................................7

175

Vitrification facility at the West Valley Demonstration Project  

SciTech Connect

This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

DesCamp, V.A.; McMahon, C.L.

1996-07-01T23:59:59.000Z

176

EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16: Kalina Geothermal Demonstration Project, Steamboat 16: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Golden Field Office to partially fund assistance for the construction and operation of a privately owned 6-megawatt geothermal power plant which includes one geothermal production well, one injection well, and ancillary facilities such as on-site access road(s) and interconnected to electric transmission lines to existing geothermal power plants. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 22, 1999 EA-1116: Finding of No Significant Impact Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada

177

Sydney 2000 Forecast Demonstration Project: Convective Storm Nowcasting  

Science Conference Proceedings (OSTI)

Five of the nowcasting systems that were available during the Sydney 2000 Forecast Demonstration Project (FDP) were selected for evaluation. These systems, from the United States, the United Kingdom, and Australia, had the capability to nowcast ...

James W. Wilson; Elizabeth E. Ebert; Thomas R. Saxen; Rita D. Roberts; Cynthia K. Mueller; Michael Sleigh; Clive E. Pierce; Alan Seed

2004-02-01T23:59:59.000Z

178

DMEC-1 Pressurized Circulating Fluidized-Bed Demonstration Project  

SciTech Connect

The DMEC-1 project will demonstrate the use of Pyropower`s PYROFLOW pressurized circulating fluidized bed technology to repower an existing coal fired generating station. This will be the first commercial application of this technology in the world. The project is now in budget period 1, the preliminary design phase.

Kruempel, G.E.; Ambrose, S.J. [Midwest Power, Des Moines, IA (United States); Provol, S.J. [Pyropower Corp., San Diego, CA (United States)

1992-12-01T23:59:59.000Z

179

2012 Integrated Gasification Combined Cycle (IGCC) Research and Development Roadmap  

Science Conference Proceedings (OSTI)

BackgroundThe second generation of integrated gasification combined cycle (IGCC) power plants is now being built or planned following nearly two decades of commercial demonstration at multiple units. State-of-the-art IGCC plants have efficiencies equivalent to that of pulverized coal power plants while exhibiting equal or superior environmental performance and lower water usage. Precombustion CO2 capture technology is commercially available and has been ...

2012-10-30T23:59:59.000Z

180

West Valley Demonstration Project Waste Incidental to Reprocessing Evaluation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project Waste Incidental to Reprocessing Evaluation for the Concentrator Feed Makeup Tank and the Melter Feed Hold Tank February 2013 Prepared by the U.S. Department of Energy West Valley, New York This page is intentionally blank. WASTE-INCIDENTAL-TO-REPROCESSING EVALUATION FOR THE WVDP CFMT AND MFHT CONTENTS Revision 0 i NOTATION (Acronyms, Abbreviations, and Units).................................................. v 1.0 INTRODUCTION ...................................................................................................... 1 1.1 Purpose. ................................................................................................................. 2

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The ethanol heavy-duty truck fleet demonstration project  

DOE Green Energy (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

182

Hawaiian Electric Company (HECO) Smart Grid (SG) Demonstration Project Description  

Science Conference Proceedings (OSTI)

This report describes one smart grid demonstration host-site project. The Hawaiian Electric Company (HECO) host site is part of the Electric Power Research Institute's (EPRI's) seven-year Smart Grid Demonstration Initiative. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a "virtual power plant" to advance the widespread, efficient, and cost-effective deployment of ...

2012-08-13T23:59:59.000Z

183

Topic Area 1: Technology Demonstration Projects | Open Energy Information  

Open Energy Info (EERE)

1: Technology Demonstration Projects 1: Technology Demonstration Projects Jump to: navigation, search Geothermal ARRA Funded Projects for Topic Area 1: Technology Demonstration Projects Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

184

DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Begins Demonstrating CCUS Technology in Project Begins Demonstrating CCUS Technology in Alabama DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama August 22, 2012 - 1:00pm Addthis Washington, DC - Carbon dioxide (CO2) injection has begun at the world's first fully integrated coal power and geologic storage project in southwest Alabama, with the goals of assessing integration of the technologies involved and laying the foundation for future use of CO2 for enhanced oil recovery (EOR). The "Anthropogenic Test"--conducted by the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven partnerships in DOE's Regional Carbon Sequestration Partnerships program--uses CO2 from a newly constructed post-combustion CO2-capture facility at Alabama Power's 2,657-megawatt Barry Electric Generating Plant (Plant Barry). It will help

185

ATTACHMENT O RECENT DEMONSTRATION PROJECTS FUNDED BY THE IAW PROGRAM  

E-Print Network (OSTI)

Generation in Parabolic Trough Solar Collectors This project is to demonstrate on a pilot scale the ability and demonstrate the direct steam generation (DSG) technology in the #12;receiver tube of a line focus parabolic trough collector, first in a single row, and then to simulate operations in multiple rows. From

186

Integrated gasification combined cycle -- A review of IGCC technology  

SciTech Connect

Over the past three decades, significant efforts have been made toward the development of cleaner and more efficient technology for power generation. Coal gasification technology received a big thrust with the concept of combined cycle power generation. The integration of coal gasification with combined cycle for power generation (IGCC) had the inherent characteristic of gas cleanup and waste minimization, which made this system environmentally preferable. Commercial-scale demonstration of a cool water plant and other studies have shown that the greenhouse gas and particulates emission from an IGCC plant is drastically lower than the recommended federal New Source Performance Standard levels. IGCC also offers a phased construction and repowering option, which allows multiple-fuel flexibility and the necessary economic viability. IGCC technology advances continue to improve efficiency and further reduce the emissions, making it the technology of the 21st century.

Joshi, M.M.; Lee, S. [Univ. of Akron, OH (United States)

1996-07-01T23:59:59.000Z

187

Technical Services Contract Awarded for West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Services Contract Awarded for West Valley Demonstration Technical Services Contract Awarded for West Valley Demonstration Project Support Services Technical Services Contract Awarded for West Valley Demonstration Project Support Services February 21, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to Safety and Ecology Corporation of Knoxville, Tennessee, for technical services at the West Valley Demonstration Project, West Valley, New York. The task order has a three-year performance period with a $1.3 million value. The task order will be issued from the Indefinite Delivery/Indefinite Quantity (ID/IQ) master contract, firm-fixed-price and time and materials. Under the task order, Safety and Ecology Corporation will perform technical

188

Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project  

DOE Green Energy (OSTI)

The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

2009-11-14T23:59:59.000Z

189

Southern California Edison Company Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Company Smart Grid Demonstration Project (2) Company Smart Grid Demonstration Project (2) Jump to: navigation, search Project Lead Southern California Edison Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $24,978,264.00 Total Project Value $53,510,209.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

190

Public Service Company of New Mexico Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of New Mexico Smart Grid Demonstration Project of New Mexico Smart Grid Demonstration Project Jump to: navigation, search Project Lead Public Service Company of New Mexico Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $1,755,931.00 Total Project Value $5,851,303.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

191

The Boeing Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Boeing Company Smart Grid Demonstration Project The Boeing Company Smart Grid Demonstration Project Jump to: navigation, search Project Lead The Boeing Company Country United States Headquarters Location St. Louis, Missouri Recovery Act Funding $8,561,396.00 Total Project Value $17,172,844.00 Coordinates 38.646991°, -90.224967° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

192

44 Tech Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Inc. Smart Grid Demonstration Project Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead 44 Tech Inc. Country United States Headquarters Location Pittsburgh, Pennsylvania Recovery Act Funding $5,000,000.00 Total Project Value $10,000,000.00 Coordinates 40.4406248°, -79.9958864° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

193

Oncor Electric Delivery Company, LLC Smart Grid Demonstration Project |  

Open Energy Info (EERE)

Company, LLC Smart Grid Demonstration Project Company, LLC Smart Grid Demonstration Project Jump to: navigation, search Project Lead Oncor Electric Delivery Company, LLC Country United States Headquarters Location Dallas, Texas Recovery Act Funding $3,471,681.00 Total Project Value $7,279,166.00 Coordinates 32.802955°, -96.769923° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

194

Waukesha Electric Systems Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Electric Systems Smart Grid Demonstration Project Electric Systems Smart Grid Demonstration Project Jump to: navigation, search Project Lead Waukesha Electric Systems Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $10,744,409.00 Total Project Value $21,548,821.00 Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

195

Long Island Power Authority Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Long Island Power Authority Country United States Headquarters Location Uniondale, New York Recovery Act Funding $12,496,047.00 Total Project Value $25,293,735.00 Coordinates 40.7003793°, -73.5929056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

196

City of Painesville Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Painesville Smart Grid Demonstration Project Painesville Smart Grid Demonstration Project Jump to: navigation, search Project Lead City of Painesville Country United States Headquarters Location Painesville, Ohio Recovery Act Funding $3,743,570.00 Total Project Value $7,487,153.00 Coordinates 41.7244885°, -81.245657° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

197

Primus Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Demonstration Project Smart Grid Demonstration Project Jump to: navigation, search Project Lead Primus Power Corporation Country United States Headquarters Location Alameda, California Recovery Act Funding $14,000,000.00 Total Project Value $46,700,000.00 Coordinates 37.7652065°, -122.2416355° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

198

Duke Energy Business Services, LLC Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Duke Energy Business Services, LLC Country United States Headquarters Location Charlotte, North Carolina Recovery Act Funding $21,806,232.00 Total Project Value $43,612,464.00 Coordinates 35.2270869°, -80.8431267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

199

Seeo, Inc Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Seeo, Inc Smart Grid Demonstration Project Seeo, Inc Smart Grid Demonstration Project Jump to: navigation, search Project Lead Seeo, Inc Country United States Headquarters Location Berkeley, California Recovery Act Funding $6,196,060.00 Total Project Value $12,392,120.00 Coordinates 37.8715926°, -122.272747° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

200

Ktech Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Ktech Corporation Smart Grid Demonstration Project Ktech Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Ktech Corporation Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $4,764,284.00 Total Project Value $9,528,567.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Premium Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Corporation Smart Grid Demonstration Project Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Premium Power Corporation Country United States Headquarters Location North Reading, Massachusetts Recovery Act Funding $7,320,000.00 Total Project Value $16,080,554.00 Coordinates 42.5750939°, -71.0786653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

202

Amber Kinetics, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Kinetics, Inc. Smart Grid Demonstration Project Kinetics, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Amber Kinetics, Inc. Country United States Headquarters Location Fremont, California Recovery Act Funding $4,000,000.00 Total Project Value $10,000,000.00 Coordinates 37.5482697°, -121.9885719° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

203

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

204

King County Carbonate Fuel Cell Demonstration Project: 2005 Update  

Science Conference Proceedings (OSTI)

This case study documents the ongoing demonstration experiences of a 1-MW carbonate fuel cell system operating on anaerobic digester gas at a wastewater treatment plant in King County, Washington. This is a follow-up to a previous EPRI report on the same project, 1011472, and summarizes operational experience and performance data obtained in 2005. The case study is one of several fuel cell project case studies under research by the EPRI Distributed Energy Resources Program. This case study is designed to...

2006-03-07T23:59:59.000Z

205

Cool water demonstration project and its industrial applications  

SciTech Connect

This paper discusses the 100 MW coal gasification combined cycle demonstration project underway at the ''Cool Water'' site of Southern California Edison Company, including the technology, project participants, schedule and opportunities for future industrial users. Industrial applications with multiple product outputs, termed ''polygeneration'', are illustrated with examples for cogeneration and trigeneration. Finally, actions required for planning large-sized gas turbine installations are suggested for today in order to hold open the future options in coal gasification.

Alger, J.; Ahner, D.J.

1982-08-01T23:59:59.000Z

206

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

207

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

208

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Demonstrates Benefits of Constructed Wetlands Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources March 10, 2009 - 1:00pm Addthis Washington, DC -- In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers have shown that manmade or "constructed" wetlands can be used to treat non-traditional water sources which could then be used in power plants or for other purposes. The successful test, which was managed by DOE's National Energy Technology Laboratory (NETL), could help power plants economically meet criteria for water reuse or discharge established by the National Pollution Discharge Elimination System and the Clean Water Act.

209

Nome, Alaska, Wind Turbine Demonstration Project Final Environmental Assessment and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment and Final Environmental Assessment and Finding of No Significant Impact November 2000 Prepared for: U.S. Department of Energy Golden Field Office 1617 Cole Blvd. Golden, CO 80401 Prepared by: Battelle Memorial Institute 505 King Avenue Columbus, OH 43201 Nome, Alaska, Wind Turbine Demonstration Project Finding of No Significant Impact Nome, Alaska, Wind Turbine Demonstration Project FINDING OF NO SIGNIFICANT IMPACT S U M M A R Y The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) to provide DOE and other public agency decision makers witb tbe environmental documentation required to take informed discretionary action on the proposed Nome, Alaska, Wind Turbine Demonstration Project (DOE/EA-1280). The EA assesses the potential environmental impacts and cumulative i

210

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEST VALLEY DEMONSTRATION PROJECT WEST VALLEY DEMONSTRATION PROJECT WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY December 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY DOE/EIS - 0337F For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE 10282 Rock Springs Road WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National

211

Integrated monitoring and surveillance system demonstration project: Phase I accomplishments  

Science Conference Proceedings (OSTI)

The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

Aumeier, S.E.; Walters, B.G.; Crawford, D.C. [and others

1997-01-15T23:59:59.000Z

212

US Recovery Act Smart Grid Energy Storage Demonstration Projects | Open  

Open Energy Info (EERE)

Storage Demonstration Projects Storage Demonstration Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

213

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop: Workshop: Compressed Natural Gas and Hydrogen Fuels: Lessons Learned for the Safe Deployment of Vehicles December 11, 2009 John Garbak, Todd Ramsden Keith Wipke, Sam Sprik, Jennifer Kurtz Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project National Renewable Energy Laboratory 2 Innovation for Our Energy Future Fuel Cell Vehicle Learning Demonstration Project Objectives and Targets * Objectives - Validate H 2 FC Vehicles and Infrastructure in Parallel - Identify Current Status and Evolution of the Technology - Objectively Assess Progress Toward Technology Readiness - Provide Feedback to H 2 Research and Development Photo: NREL Solar Electrolysis Station, Sacramento, CA Performance Measure

214

Microsoft Word - 41889_GE_IGCC Syst Study_FactSheet_012405.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

GE Energy 1 December 2004 Project No. DE-FC26-03NT41889 System Study For Improved Gas Turbine Performance For Coal IGCC Application Fact Sheet I Project Participants: A. Prime...

215

West Valley Demonstration Project Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 7 Hazards Survey and Hazards Assessment .................................... 7 Program Plans and Procedures ..................................................... 8 Emergency Responder Performance .......................................... 10 Feedback and Continuous Improvement....................................

216

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Project Overview and Fall 2006 Results (Presentation)  

DOE Green Energy (OSTI)

This presentation on NREL's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project was given by Keith Wipke at the ZEV Technology Symposium on September 15, 2006.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.; Hooker, D.

2006-09-01T23:59:59.000Z

217

West Valley Demonstration Project Administrative Consent Order, August 27, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________| Table of Contents Parties Jurisdiction Purpose and Scope Statement of Facts & Conclusions of Law I. Implementation of the STP II Annual Updates III. Establishing Milestones and Planning Schedule Activity IV. Covered Matters V. Inclusion of New Waste Streams VI. Amendments VII. Project Managers

218

Solar Two: A successful power tower demonstration project  

DOE Green Energy (OSTI)

Solar Two, a 10MWe power tower plant in Barstow, California, successfully demonstrated the production of grid electricity at utility-scale with a molten-salt solar power tower. This paper provides an overview of the project, from inception in 1993 to closure in the spring of 1999. Included are discussions of the goals of the Solar Two consortium, the planned-vs.-actual timeline, plant performance, problems encountered, and highlights and successes of the project. The paper concludes with a number of key results of the Solar Two test and evaluation program.

REILLY,HUGH E.; PACHECO,JAMES E.

2000-03-02T23:59:59.000Z

219

Alaska village demonstration projects. Report to the Congress  

SciTech Connect

The Alaska Village Demonstration Projects (AVDP) were authorized by Section 113, P.L. 92-500 (86 STAT 816), for the purpose of demonstrating methods to improve sanitary conditions in native villages of Alaska. Central community facilities have been constructed in the native villages of Emmonak and Wainwright to provide a safe water supply; toilets, bathing, and laundry facilities; and sewage and solid waste disposal. Although there has not been enough time to allow full operation and evaluation of these facilities, it is apparent that the technology is available to provide these basic utility services to the demonstration villages. A major issue still to be addressed is the lack of clear responsibility for the operation and maintenance of the facilities after the Environmental Protection Agency demonstration program is completed. Adequate local resources to operate the installations are lacking. Continued experience with the AVDP is needed to complete evaluation and develop recommendations in relation to the establishment of a statewide program.

1973-07-01T23:59:59.000Z

220

Expedited Technology Demonstration Project Baseline Revision 3.0  

SciTech Connect

The Expedited Technology Demonstration Project Plan, MWNT Revised Baseline 3.0, replaces and significantly modifies the current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is shown. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in FY97, followed by the activation of final forms in FY98.

Adamson, M.G.; Densley, P.J.

1996-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

This project has two primary purposes: (1) Build a small-footprint (SFP) fuel production plant to prove the feasibility of this relatively transportable technology on an intermediate scale (i.e. between laboratory-bench and commercial capacity) and produce as much as 150,000 gallons of hydrogen-saturated Fischer-Tropsch (FT) diesel fuel; and (2) Use the virtually sulfur-free fuel produced to demonstrate (over a period of at least six months) that it can not only be used in existing diesel engines, but that it also can enable significantly increased effectiveness and life of the next-generation exhaust-after-treatment emission control systems that are currently under development and that will be required for future diesel engines. Furthermore, a well-to-wheels economic analysis will be performed to characterize the overall costs and benefits that would be associated with the actual commercial production, distribution and use of such FT diesel fuel made by the process under consideration, from the currently underutilized (or entirely un-used) energy resources targeted, primarily natural gas that is stranded, sub-quality, off-shore, etc. During the first year of the project, which is the subject of this report, there have been two significant areas of progress: (1) Most of the preparatory work required to build the SFP fuel-production plant has been completed, and (2) Relationships have been established, and necessary project coordination has been started, with the half dozen project-partner organizations that will have a role in the fuel demonstration and evaluation phase of the project. Additional project tasks directly related to the State of Alaska have also been added to the project. These include: A study of underutilized potential Alaska energy resources that could contribute to domestic diesel and distillate fuel production by providing input energy for future commercial-size SFP fuel production plants; Demonstration of the use of the product fuel in a heavy-duty diesel vehicle during the Alaska winter; a comparative study of the cold-starting characteristics of FT and conventional diesel fuel; and demonstration of the use of the fuel to generate electricity for rural Alaskan villages using both a diesel generator set, and a reformer-equipped fuel cell.

Stephen P. Bergin

2003-04-23T23:59:59.000Z

222

300kW Energy Storage Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kW Energy Storage Demonstration kW Energy Storage Demonstration Project Technical Overview Presented at: Annual Doe Peer Review Meeting ─ 2008 DOE Energy Storage & Power Electronics Research Programs By Ib I. Olsen September 29, 2008 116 John Street - Suite 2320 New York, New York 10038 (p) 1.212.732.5507 (f) 1.212.732.5597 www.gaiapowertech.com This project is part of the Joint Energy Storage Initiative between the New York State Energy Research and Development Authority (NYSERDA) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS), and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration, under contract DE-AC04-94AL85000

223

NETL: News Release - DOE-Supported Project Demonstrates Benefits of  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources Flue gas desulfurization water was treated in a constructed wetlands system consisting of five reactors planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Flue gas desulfurization water was treated in a constructed wetlands system consisting of five "reactors" planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Washington, DC - In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers

224

West Valley Demonstration Project High-Level Waste Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT_19507_1 DRAFT_19507_1 High-Level Waste Management Bryan Bower, DOE Director - WVDP DOE High-Level Waste Corporate Board Meeting Savannah River Site April 1, 2008 West Valley Demonstration Project West Valley Demonstration Project DRAFT_19507_2 West Valley High-Level Waste To solidify the radioactive material from approximately 600,000 gallons of high-level radioactive waste into a durable, high-quality glass, both a pretreatment system to remove salts and sulfates from the waste and a vitrification system/process were designed. To solidify the radioactive material from approximately 600,000 gallons of high-level radioactive waste into a durable, high-quality glass, both a pretreatment system to remove salts and sulfates from the waste and a vitrification system/process were designed.

225

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round 5  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Advanced Electric Power Generation - Integrated Gasification Combined Cycle Kentucky Pioneer IGCC Demonstration Project - Project Brief [PDF-80KB] Kentucky Pioneer Energy, L.L.C.; Trapp, Clark County, KY PROGRAM PUBLICATIONS Final Report Kentucky Pioneer Energy LLC Integrated Gasification Combined Cycle Project: 2 MW Fuel Cell Demonstration [PDF-3.2MB] (Apr 2006) Design Reports Kentucky Pioneer Energy IGCC CCT Demonstration Project, 2 MW Fuel Cell Demonstration, Basis of Design [PDF-696KB] (May 2002) Environmental Reports Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project: Final Environmental Impact Statement, [PDF-5.7MB] (Nov 2002) Appendices A-C and E [PDF-965KB] Appendix D, Pages 1-40 [PDF-5.2MB] Appendix D, Pages 41-71 [PDF-4.3MB]

226

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report  

Science Conference Proceedings (OSTI)

The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

Not Available

1992-02-01T23:59:59.000Z

227

Duke Energy Notrees Wind Storage Demonstration Project: 2013 Interim Report  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) technical update is an interim report summarizing the status of Duke Energys Notrees Wind Storage Demonstration Project, which involves integrating a 36-MW battery energy storage system (BESS) from Xtreme Power with the152.6-MW Notrees Wind Farm. Xtreme Powers solid lead-acid battery represents one of an emerging number of energy storage devices endowed with the potential to serve multiple value-added utility applications. ...

2013-12-19T23:59:59.000Z

228

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

DOE Green Energy (OSTI)

General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

Stottler, Gary

2012-02-08T23:59:59.000Z

229

Distributed Energy Resources Integration in the Smart Grid Demonstration Project  

Science Conference Proceedings (OSTI)

In an effort to answer some of the basic system architecture questions posed by members, EPRI undertook a survey to find, among members that have smart grid demonstration projects, what the basic system architecture strategy was and basic concerns that may have architectural implications for their Distributed Energy Resource (DER) deployments. To that end, a longitudinal survey was designed to determine the basic demographics of the community, e.g. number of DER devices being deployed, the basic ...

2012-11-14T23:59:59.000Z

230

Automated Demand Response Technology Demonstration Project for Small and  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Demonstration Project for Small and Technology Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings Publication Type Report LBNL Report Number LBNL-4982E Year of Publication 2011 Authors Page, Janie, Sila Kiliccote, Junqiao Han Dudley, Mary Ann Piette, Albert K. Chiu, Bashar Kellow, Edward Koch, and Paul Lipkin Date Published 07/2011 Publisher CEC/LBNL Keywords demand response, emerging technologies, market sectors, medium commercial business, openadr, small commercial, small commercial business, technologies Abstract Small and medium commercial customers in California make up about 20-25% of electric peak load in California. With the roll out of smart meters to this customer group, which enable granular measurement of electricity consumption, the investor-owned utilities will offer dynamic prices as default tariffs by the end of 2011. Pacific Gas and Electric Company, which successfully deployed Automated Demand Response (AutoDR) Programs to its large commercial and industrial customers, started investigating the same infrastructures application to the small and medium commercial customers. This project aims to identify available technologies suitable for automating demand response for small-medium commercial buildings; to validate the extent to which that technology does what it claims to be able to do; and determine the extent to which customers find the technology useful for DR purpose. Ten sites, enabled by eight vendors, participated in at least four test AutoDR events per site in the summer of 2010. The results showed that while existing technology can reliably receive OpenADR signals and translate them into pre-programmed response strategies, it is likely that better levels of load sheds could be obtained than what is reported here if better understanding of the building systems were developed and the DR response strategies had been carefully designed and optimized for each site.

231

York County Energy Partners DOE CCI ACFB demonstration project  

Science Conference Proceedings (OSTI)

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. [Air Products and Chemicals, Inc., Allentown, PA (United States); Cox, J.; Parham, D. [Foster Wheeler Energy Corp., Clinton, NJ (United States)

1992-09-01T23:59:59.000Z

232

York County Energy Partners DOE CCI ACFB demonstration project  

Science Conference Proceedings (OSTI)

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. (Air Products and Chemicals, Inc., Allentown, PA (United States)); Cox, J.; Parham, D. (Foster Wheeler Energy Corp., Clinton, NJ (United States))

1992-01-01T23:59:59.000Z

233

Air permitting of IGCC plants  

SciTech Connect

The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

Chitikela, S.R.

2007-07-01T23:59:59.000Z

234

CoalFleet IGCC Permitting Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance to owners of planned Integrated Gasification Combined Cycle (IGCC) power plants in order to assist them in permitting these advanced coal power generation facilities. The CoalFleet IGCC Permitting Guidelines summarize U.S. federal requirements for obtaining air, water, and solid waste permits for a generic IGCC facility, as described in EPRI report 1012227, the CoalFleet User Design Basis Specification (UDBS). The Guidelines present characteristics of IGCC emissions that mus...

2006-11-16T23:59:59.000Z

235

MHK Projects/MORILD Demonstration Plant | Open Energy Information  

Open Energy Info (EERE)

MORILD Demonstration Plant MORILD Demonstration Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":69.8079,"lon":18.6795,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

236

MHK Projects/Race Rocks Demonstration | Open Energy Information  

Open Energy Info (EERE)

Race Rocks Demonstration Race Rocks Demonstration < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.2844,"lon":-123.531,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

237

LIMB Demonstraton Project Extension and Coolside Demonstration: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 LIMB Demonstration Project Extension and Coolside Demonstration: A DOE Assessment April 2000 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

238

Nucla circulating atmospheric fluidized bed demonstration project. Final report  

Science Conference Proceedings (OSTI)

Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

Not Available

1991-10-01T23:59:59.000Z

239

Microsoft Word - 41889_GE_IGCC System Study_Factsheet_Rev0a_01...  

NLE Websites -- All DOE Office Websites (Extended Search)

System Study for Improved Gas Turbine Performance for Coal IGCC Application FACT SHEET Revision 0a Jan. 14, 2004 Page 1 of 3 I. PROJECT DESCRIPTION A. Objective: This study will...

240

Microsoft Word - 41889_GE_IGCC System Study_Factsheet_Rev01_07...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet: "System Study For Improved Gas Turbine Performance For Coal IGCC Application" DOE Contract No: DE-FC26-03NT41889 I Project Description: A. Objective: This study will...

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations West Valley Demonstration Project DOE Manual 435.1-1 Waste...

242

Northwest Open Automated Demand Response Technology Demonstration Project  

SciTech Connect

The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides ancillary services within its own balancing authority. The relationship between BPA and SCL creates a unique opportunity to create DR programs that address both BPA's and SCL's markets simultaneously. Although simultaneously addressing both market could significantly increase the value of DR programs for BPA, SCL, and the end user, establishing program parameters that maximize this value is challenging because of complex contractual arrangements and the absence of a central Independent System Operator or Regional Transmission Organization in the northwest.

Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

2010-03-17T23:59:59.000Z

243

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

SciTech Connect

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

1976-04-01T23:59:59.000Z

244

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

DOE Green Energy (OSTI)

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

Not Available

1976-04-01T23:59:59.000Z

245

West Valley Demonstration Project Waste Management Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE-WEST VALLEY AREA OFFICE P.O. BOX 191 WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Draft West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Daniel W. Sullivan Document Manager DOE-West Valley Area Office

246

West Valley Demonstration Project Waste Management Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY April 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE P.O. BOX 191 WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Draft West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Daniel W. Sullivan Document Manager DOE West Valley Area Office

247

LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

41 41 LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment January 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov Disclaimer 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

248

Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Advanced Flue Gas Desulfurization (AFGD) Demonstration Project A DOE Assessment August 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

249

Uranium soils integrated demonstration: Soil characterization project report  

Science Conference Proceedings (OSTI)

An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

Cunnane, J.C. [Argonne National Lab., IL (United States); Gill, V.R. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Lee, S.Y. [Oak Ridge National Lab., TN (United States); Morris, D.E. [Los Alamos National Lab., NM (United States); Nickelson, M.D. [HAZWRAP, Oak Ridge, TN (United States); Perry, D.L. [Lawrence Berkeley Lab., CA (United States); Tidwell, V.C. [Sandia National Labs., Albuquerque, NM (United States)

1993-08-01T23:59:59.000Z

250

Electric G-Van demonstration and commercial assessment project  

DOE Green Energy (OSTI)

The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

1992-12-01T23:59:59.000Z

251

New Mexico State University Campus geothermal demonstration project  

DOE Green Energy (OSTI)

This report presents the design, construction highlights, and performance of the New Mexico State University Campus Geothermal Demonstration Project at Las Cruces, New Mexico. Construction started in July 1981, first system use was January 1982, and the system was dedicated on April 21, 1982. Included herein are summary observations after two years of use. The geothermal hot water from New Mexico State University wells is used to heat potable water, which in turn provides 83 percent of the domestic hot water on the New Mexico State University campus, as well as space heat to two buildings, and for two heated swimming pools. The original system is providing service to 30 total buildings, with two additional buildings (150,000 square feet) in process of geothermal conversion.) The system overall performance has been excellent, except for geothermal well pump problems. In terms of operating efficiency, the system has exceeded the design parameters. In spite of abnormally high costs for well and pump repairs, the system has shown a positive cost avoidance of more than $118,000 for the first year of operation. For the first two full years of operation, the system has produced a net positive cost avoidance of more than $200,000. Payback on the total investment of $1,670,000 is projected to be 6 to 10 years, depending on the future prices of natural gas and electricity.

Cuniff, R.A.; Fisher, K.P.; Chintawongvanich, P.

1984-04-01T23:59:59.000Z

252

Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.  

SciTech Connect

The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

Barnett, Cole; Thor, Philip W.

1990-06-01T23:59:59.000Z

253

Locomotive Emission and Engine Idle Reduction Technology Demonstration Project  

DOE Green Energy (OSTI)

In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units demonstrated an IME of 64% at stationary idle for the test period. The data collected during calendar year 2004 demonstrated that 707,600 gallons of fuel were saved and 285 tons of NOX were not emitted as a result of idle management in stationary idle, which translates to 12,636 gallons and 5.1 tons of NOx per unit respectively. The noise reduction capabilities of the APU demonstrated that at 150 feet from the locomotive the loaded APU with the main engine shut down generated noise that was only marginally above ambient noise level.

John R. Archer

2005-03-14T23:59:59.000Z

254

U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update (Presentation)  

DOE Green Energy (OSTI)

This presentation summarizes U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-10-21T23:59:59.000Z

255

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. Within the Combustion Laboratory of the Penn State Energy Institute, they have installed and equipped a Navistar V-8 direct-injection turbodiesel engine for measurement of gaseous and particulate emissions and examination of the impact of fuel composition on diesel combustion. They have also reconfigured a high-pressure viscometer for studies of the viscosity, bulk modulus (compressibility) and miscibility of blends of diesel fuel, dimethyl ether and lubricity additives. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have examined blends of an oxygenated fuel additive (a liquid fuel called CETANER{trademark}) produced by Air Products, for comparison with dimethyl ether blended at the same weight of oxygen addition, 2 wt.%. While they have not operated the engine on DME yet, they are now preparing to do so. A fuel system for delivery of DME/Diesel blends has been configured and initial investigations at low DME blend ratios (around 5-10 vol%) will begin shortly. They have also performed viscosity measurements on diesel fuel, DME and 50-50 blends of DME in diesel. These tests have verified that DME has a much lower viscosity than the diesel fuel and that the viscosity of the blended fuel is also much lower than the diesel base fuel. This has implications for the injection and atomization of the DME/diesel blends.

Elana M. Chapman; Shirish Bhide; Andre L. Boehman; David Klinikowski

2003-04-01T23:59:59.000Z

256

Geothermal project summaries. Geothermal energy research, development and demonstration program  

DOE Green Energy (OSTI)

Summaries of all Division of Geothermal Energy supported projects for which contracts have been executed are compiled. Each summary includes pertinent statistical data for that project and an abstract summarizing the project plans and accomplishments. The projects summarized fall into six categories: engineering research and development, resource exploration and assessment, hydrothermal technology applications, advanced technology applications, utilization experiments, and environmental control and institutional studies. (MHR)

Not Available

1976-09-01T23:59:59.000Z

257

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WVDP Waste Management EIS WVDP Waste Management EIS S-3 Figure S-1. Location of the West Valley Demonstration Project Not to scale Final WVDP Waste Management EIS S-23 Table S-2. Summary of Normal Operational Impacts at West Valley Impact Area Unit of Measure No Action Alternative Alternative A - Preferred Alternative B Human Health Impacts a Public Impacts from Ongoing Operations MEI LCF 3.7 × 10 -7 3.7 × 10 -7 3.7 × 10 -7 Population LCF 1.5 × 10 -3 1.5 × 10 -3 1.5 × 10 -3 Worker Impacts Involved worker MEI LCF 3.4 × 10 -4 1.3 × 10 -3 1.3 × 10 -3 Noninvolved worker MEI LCF 3.0 × 10 -4 3.0 × 10 -4 3.0 × 10 -4 Involved worker population LCF 2.1 × 10 -3 0.031 0.031 Noninvolved worker population LCF 0.075 0.075 0.075 Total worker population LCF 0.077 0.11 0.11

258

Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report  

DOE Green Energy (OSTI)

In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15 states.

Gambrell, KP

2002-01-11T23:59:59.000Z

259

2012 Integrated Gasification Combined Cycle (IGCC) Research and Development Roadmap - PUBLIC  

Science Conference Proceedings (OSTI)

The second generation of integrated-gasification combined-cycle (IGCC) power plants is now being built or planned following nearly two decades of commercial demonstration at multiple units. State-of-the-art IGCC plants have efficiencies equivalent to that of pulverized coal power plants while exhibiting equal or superior environmental performance and lower water usage. Pre-combustion CO2 capture technology is commercially available and has been demonstrated in several gasification plants, ...

2012-12-20T23:59:59.000Z

260

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work and challenges continued as it has been difficult to maintain operability of the shuttle bus due to fuel and component difficulties. In late June 2002, the pump head itself developed operational problems (loss of smooth function) leading to excessive stress on the magnetic coupling and excessive current draw to operate. A new pump head was installed on the system to alleviate this problem and the shuttle bus operated successfully on DME blends from 10-25 vol% on the shuttle bus loop until September 30, 2002. During the period of operation on the campus loop, the bus was pulled from service, operated at the PTI test track and real-time emissions measurements were obtained using an on-board emissions analyzer from Clean Air Technologies International, Inc. Particulate emissions reductions of 60% and 80% were observed at DME blend ratios of 12 vol.% and 25 vol.%, respectively, as the bus was operated over the Orange County driving cycle. Increases in NOx, CO and HC emissions were observed, however. In summary, the conversion of the shuttle bus was successfully accomplished, particulate emissions reductions were observed, but there were operational challenges in the field. Nonetheless, they were able to demonstrate reliable operation of the shuttle bus on DME-diesel blends.

Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

2003-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Mercury Fate in IGCC Power Plants  

Science Conference Proceedings (OSTI)

Integrated Gasification Combined Cycle (IGCC) power plants are an alternative to conventional pulverized coal boilers. In an IGCC facility, coal or other feedstocks are converted to synthetic gas (syngas) at high temperature and pressure. The syngas can be used to produce electrical power in a combined cycle combustion turbine. One of the advantages of IGCC technology is that contaminants can be removed from the syngas prior to combustion, reducing the volume of gas that must be treated and leading to lo...

2006-12-21T23:59:59.000Z

262

Northwest Open Automated Demand Response Technology Demonstration Project  

SciTech Connect

Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was conducted using three different baseline models for estimation peak load reductions. One was three-in-ten baseline, which is based on the site electricity consumption from 7 am to 10 am for the three days with the highest consumption of the previous ten business days. The second model, the LBNL outside air temperature (OAT) regression baseline model, is based on OAT data and site electricity consumption from the previous ten days, adjusted using weather regressions from the fifteen-minute electric load data during each DR test event for each site. A third baseline that simply averages the available load data was used for sites less with less than 10 days of historical meter data. The evaluation also included surveying sites regarding any problems or issues that arose during the DR test events. Question covered occupant comfort, control issues and other potential problems.

Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

2009-08-01T23:59:59.000Z

263

FCV Learning Demonstration: Project Midpoint Status and Fall 2007 Results  

DOE Green Energy (OSTI)

Status reoprt on NREL's fuel cell vehicle learning demonstration presented at the 2007 EVS-23 meeting in Anaheim, CA.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

264

Demonstration Development Project: Evaluation of a Test Loop to Demonstrate Handling Properties of Liquid CO2-Coal Slurry  

Science Conference Proceedings (OSTI)

Integrated gasification combined cycle (IGCC) power plants employing liquid CO2 in lieu of water as the slurrying medium to feed coal to the gasifier are a promising option for carbon capture and storage (CCS). This report summarizes the design and cost estimate for a proposed CO2-coal slurry test loop system. The objective is to validate a cost estimate for the construction of a full scale CO2-coal slurry test loop and aid in technical aspects of working with ...

2014-01-07T23:59:59.000Z

265

Next Steps for the FCEV Learning Demonstration Project (Presentation)  

DOE Green Energy (OSTI)

This presentation summarizes project goals; vehicle and H2 station deployment status, critical performance compared to targets; highlights of latest vehicle and infrastructure analysis results and progress; learning demo next steps; highlights of partner activities and summary.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2011-02-01T23:59:59.000Z

266

Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report  

SciTech Connect

The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

NONE

1996-04-30T23:59:59.000Z

267

CoalFleet RD&D Augmentation Plan for Integrated Gasification Combined Cycle (IGCC) Power Plants  

Science Conference Proceedings (OSTI)

Advanced, clean coal technologies such as integrated gasification combined cycle (IGCC) offer societies around the world the promise of efficient, affordable power generation at markedly reduced levels of emissions8212including "greenhouse gases" linked to global climate change8212relative to today's current fleet of coal-fired power plants. To help accelerate the development, demonstration, and market introduction of IGCC and other clean coal technologies, EPRI formed the CoalFleet for Tomorrow initiati...

2007-01-24T23:59:59.000Z

268

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2005-09-30T23:59:59.000Z

269

The Sydney 2000 Olympic Games Forecast Demonstration Project: Forecasting, Observing Network Infrastructure, and Data Processing Issues  

Science Conference Proceedings (OSTI)

The Sydney 2000 Olympic Games World Weather Research Programme Forecast Demonstration Project (WWRP FDP) aimed to demonstrate the utility and impact of modern nowcast systems. The project focused on the use of radar processing systems and ...

Peter T. May; Thomas D. Keenan; Rod Potts; James W. Wilson; Rob Webb; Andrew Treloar; Elly Spark; Sue Lawrence; Elizabeth Ebert; John Bally; Paul Joe

2004-02-01T23:59:59.000Z

270

Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)  

DOE Green Energy (OSTI)

Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2011-03-01T23:59:59.000Z

271

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2008  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2008.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2008-10-01T23:59:59.000Z

272

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update; Preprint  

DOE Green Energy (OSTI)

Summary of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project from initiation through January 2006.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.; Hooker, D.

2006-03-01T23:59:59.000Z

273

US Recovery Act Smart Grid Demonstration Projects | Open Energy Information  

Open Energy Info (EERE)

Projects Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

274

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

This report documents the construction and performance testing of a 3000-ft length of fly ash base under a highway shoulder. Following three years of service, the road shoulder shows no signs of premature deterioration. This report should aid utilities seeking to increase ash-use rates in highway-related projects, as well as state highway design engineers responsible for preparing construction specifications.

1991-03-05T23:59:59.000Z

275

Systems Study for Improving Gas Turbine Performance for Coal/IGCC Application  

SciTech Connect

This study identifies vital gas turbine (GT) parameters and quantifies their influence in meeting the DOE Turbine Program overall Integrated Gasification Combined Cycle (IGCC) plant goals of 50% net HHV efficiency, $1000/kW capital cost, and low emissions. The project analytically evaluates GE advanced F class air cooled technology level gas turbine conceptual cycle designs and determines their influence on IGCC plant level performance including impact of Carbon capture. This report summarizes the work accomplished in each of the following six Tasks. Task 1.0--Overall IGCC Plant Level Requirements Identification: Plant level requirements were identified, and compared with DOE's IGCC Goal of achieving 50% Net HHV Efficiency and $1000/KW by the Year 2008, through use of a Six Sigma Quality Functional Deployment (QFD) Tool. This analysis resulted in 7 GT System Level Parameters as the most significant. Task 2.0--Requirements Prioritization/Flow-Down to GT Subsystem Level: GT requirements were identified, analyzed and prioritized relative to achieving plant level goals, and compared with the flow down of power island goals through use of a Six Sigma QFD Tool. This analysis resulted in 11 GT Cycle Design Parameters being selected as the most significant. Task 3.0--IGCC Conceptual System Analysis: A Baseline IGCC Plant configuration was chosen, and an IGCC simulation analysis model was constructed, validated against published performance data and then optimized by including air extraction heat recovery and GE steam turbine model. Baseline IGCC based on GE 207FA+e gas turbine combined cycle has net HHV efficiency of 40.5% and net output nominally of 526 Megawatts at NOx emission level of 15 ppmvd{at}15% corrected O2. 18 advanced F technology GT cycle design options were developed to provide performance targets with increased output and/or efficiency with low NOx emissions. Task 4.0--Gas Turbine Cycle Options vs. Requirements Evaluation: Influence coefficients on 4 key IGCC plant level parameters (IGCC Net Efficiency, IGCC Net Output, GT Output, NOx Emissions) of 11 GT identified cycle parameters were determined. Results indicate that IGCC net efficiency HHV gains up to 2.8 pts (40.5% to 43.3%) and IGCC net output gains up to 35% are possible due to improvements in GT technology alone with single digit NOx emission levels. Task 5.0--Recommendations for GT Technical Improvements: A trade off analysis was conducted utilizing the performance results of 18 gas turbine (GT) conceptual designs, and three most promising GT candidates are recommended. A roadmap for turbine technology development is proposed for future coal based IGCC power plants. Task 6.0--Determine Carbon Capture Impact on IGCC Plant Level Performance: A gas turbine performance model for high Hydrogen fuel gas turbine was created and integrated to an IGCC system performance model, which also included newly created models for moisturized syngas, gas shift and CO2 removal subsystems. This performance model was analyzed for two gas turbine technology based subsystems each with two Carbon removal design options of 85% and 88% respectively. The results show larger IGCC performance penalty for gas turbine designs with higher firing temperature and higher Carbon removal.

Ashok K. Anand

2005-12-16T23:59:59.000Z

276

Systems Study for Improving Gas Turbine Performance for Coal/IGCC Application  

DOE Green Energy (OSTI)

This study identifies vital gas turbine (GT) parameters and quantifies their influence in meeting the DOE Turbine Program overall Integrated Gasification Combined Cycle (IGCC) plant goals of 50% net HHV efficiency, $1000/kW capital cost, and low emissions. The project analytically evaluates GE advanced F class air cooled technology level gas turbine conceptual cycle designs and determines their influence on IGCC plant level performance including impact of Carbon capture. This report summarizes the work accomplished in each of the following six Tasks. Task 1.0--Overall IGCC Plant Level Requirements Identification: Plant level requirements were identified, and compared with DOE's IGCC Goal of achieving 50% Net HHV Efficiency and $1000/KW by the Year 2008, through use of a Six Sigma Quality Functional Deployment (QFD) Tool. This analysis resulted in 7 GT System Level Parameters as the most significant. Task 2.0--Requirements Prioritization/Flow-Down to GT Subsystem Level: GT requirements were identified, analyzed and prioritized relative to achieving plant level goals, and compared with the flow down of power island goals through use of a Six Sigma QFD Tool. This analysis resulted in 11 GT Cycle Design Parameters being selected as the most significant. Task 3.0--IGCC Conceptual System Analysis: A Baseline IGCC Plant configuration was chosen, and an IGCC simulation analysis model was constructed, validated against published performance data and then optimized by including air extraction heat recovery and GE steam turbine model. Baseline IGCC based on GE 207FA+e gas turbine combined cycle has net HHV efficiency of 40.5% and net output nominally of 526 Megawatts at NOx emission level of 15 ppmvd{at}15% corrected O2. 18 advanced F technology GT cycle design options were developed to provide performance targets with increased output and/or efficiency with low NOx emissions. Task 4.0--Gas Turbine Cycle Options vs. Requirements Evaluation: Influence coefficients on 4 key IGCC plant level parameters (IGCC Net Efficiency, IGCC Net Output, GT Output, NOx Emissions) of 11 GT identified cycle parameters were determined. Results indicate that IGCC net efficiency HHV gains up to 2.8 pts (40.5% to 43.3%) and IGCC net output gains up to 35% are possible due to improvements in GT technology alone with single digit NOx emission levels. Task 5.0--Recommendations for GT Technical Improvements: A trade off analysis was conducted utilizing the performance results of 18 gas turbine (GT) conceptual designs, and three most promising GT candidates are recommended. A roadmap for turbine technology development is proposed for future coal based IGCC power plants. Task 6.0--Determine Carbon Capture Impact on IGCC Plant Level Performance: A gas turbine performance model for high Hydrogen fuel gas turbine was created and integrated to an IGCC system performance model, which also included newly created models for moisturized syngas, gas shift and CO2 removal subsystems. This performance model was analyzed for two gas turbine technology based subsystems each with two Carbon removal design options of 85% and 88% respectively. The results show larger IGCC performance penalty for gas turbine designs with higher firing temperature and higher Carbon removal.

Ashok K. Anand

2005-12-16T23:59:59.000Z

277

SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky  

SciTech Connect

The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

None

1982-03-01T23:59:59.000Z

278

West Valley Demonstration Project Prepares to Relocate High-Level Waste |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Prepares to Relocate High-Level West Valley Demonstration Project Prepares to Relocate High-Level Waste West Valley Demonstration Project Prepares to Relocate High-Level Waste December 24, 2013 - 12:00pm Addthis The West Valley Demonstration Project’s high-level waste canisters will be relocated to interim onsite storage. The West Valley Demonstration Project's high-level waste canisters will be relocated to interim onsite storage. The first group of eight concrete storage casks for the West Valley Demonstration Project’s high-level waste. The first group of eight concrete storage casks for the West Valley Demonstration Project's high-level waste. Site subcontractor American DND completed demolition of the contaminated 01-14 Building in 2013. Site subcontractor American DND completed demolition of the contaminated

279

West Valley Demonstration Project Prepares to Relocate High-Level Waste |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Prepares to Relocate High-Level West Valley Demonstration Project Prepares to Relocate High-Level Waste West Valley Demonstration Project Prepares to Relocate High-Level Waste December 24, 2013 - 12:00pm Addthis The West Valley Demonstration Project’s high-level waste canisters will be relocated to interim onsite storage. The West Valley Demonstration Project's high-level waste canisters will be relocated to interim onsite storage. The first group of eight concrete storage casks for the West Valley Demonstration Project’s high-level waste. The first group of eight concrete storage casks for the West Valley Demonstration Project's high-level waste. Site subcontractor American DND completed demolition of the contaminated 01-14 Building in 2013. Site subcontractor American DND completed demolition of the contaminated

280

Solar demonstration project in a fast-food restaurant  

Science Conference Proceedings (OSTI)

Results are given of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

McClenahan, D.

1980-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

A 3000-ft-length fly ash base under a highway shoulder will help demonstrate the impact of reused ash on structural integrity and groundwater. This report provides valuable design details for utilities seeking to increase ash reuse and for state highway design engineers responsible for preparing construction specifications.

1989-01-10T23:59:59.000Z

282

Baca geothermal demonstration project. Power plant detail design document  

DOE Green Energy (OSTI)

This Baca Geothermal Demonstration Power Plant document presents the design criteria and detail design for power plant equipment and systems, as well as discussing the rationale used to arrive at the design. Where applicable, results of in-house evaluations of alternatives are presented.

Not Available

1981-02-01T23:59:59.000Z

283

Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants  

SciTech Connect

The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, was re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for coal/IGCC powerplants. The new program was re-titled ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants''. This final report summarizes the work accomplished from March 1, 2003 to March 31, 2004 on the four original tasks, and the work accomplished from April 1, 2004 to July 30, 2005 on the two re-directed tasks. The program Tasks are summarized below: Task 1--IGCC Environmental Impact on high Temperature Materials: The first task was refocused to address IGCC environmental impacts on high temperature materials used in gas turbines. This task screened material performance and quantified the effects of high temperature erosion and corrosion of hot gas path materials in coal/IGCC applications. The materials of interest included those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: The second task was reduced in scope to demonstrate new technologies to determine the inservice health of advanced technology coal/IGCC powerplants. The task focused on two critical sensing needs for advanced coal/IGCC gas turbines: (1) Fuel Quality Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and detection of fuel impurities that could lead to rapid component degradation. (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware. Task 3--Advanced Methods for Combustion Monitoring and Control: The third task was originally to develop and validate advanced monitoring and control methods for coal/IGCC gas turbine combustion systems. This task was refocused to address pre-mixed combustion phenomenon for IGCC applications. The work effort on this task was shifted to another joint GE Energy/DOE-NETL program investigation, High Hydrogen Pre-mixer Designs, as of April 1, 2004. Task 4--Information Technology (IT) Integration: The fourth task was originally to demonstrate Information Technology (IT) tools for advanced technology coal/IGCC powerplant condition assessment and condition based maintenance. The task focused on development of GateCycle. software to model complete-plant IGCC systems, and the Universal On-Site Monitor (UOSM) to collect and integrate data from multiple condition monitoring applications at a power plant. The work on this task was stopped as of April 1, 2004.

Kenneth A. Yackly

2005-12-01T23:59:59.000Z

284

Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants  

DOE Green Energy (OSTI)

The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, was re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for coal/IGCC powerplants. The new program was re-titled ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants''. This final report summarizes the work accomplished from March 1, 2003 to March 31, 2004 on the four original tasks, and the work accomplished from April 1, 2004 to July 30, 2005 on the two re-directed tasks. The program Tasks are summarized below: Task 1--IGCC Environmental Impact on high Temperature Materials: The first task was refocused to address IGCC environmental impacts on high temperature materials used in gas turbines. This task screened material performance and quantified the effects of high temperature erosion and corrosion of hot gas path materials in coal/IGCC applications. The materials of interest included those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: The second task was reduced in scope to demonstrate new technologies to determine the inservice health of advanced technology coal/IGCC powerplants. The task focused on two critical sensing needs for advanced coal/IGCC gas turbines: (1) Fuel Quality Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and detection of fuel impurities that could lead to rapid component degradation. (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware. Task 3--Advanced Methods for Combustion Monitoring and Control: The third task was originally to develop and validate advanced monitoring and control methods for coal/IGCC gas turbine combustion systems. This task was refocused to address pre-mixed combustion phenomenon for IGCC applications. The work effort on this task was shifted to another joint GE Energy/DOE-NETL program investigation, High Hydrogen Pre-mixer Designs, as of April 1, 2004. Task 4--Information Technology (IT) Integration: The fourth task was originally to demonstrate Information Technology (IT) tools for advanced technology coal/IGCC powerplant condition assessment and condition based maintenance. The task focused on development of GateCycle. software to model complete-plant IGCC systems, and the Universal On-Site Monitor (UOSM) to collect and integrate data from multiple condition monitoring applications at a power plant. The work on this task was stopped as of April 1, 2004.

Kenneth A. Yackly

2005-12-01T23:59:59.000Z

285

Organization of IGCC processes with reduced order CFD models  

SciTech Connect

Integrated gasificationcombinedcycle(IGCC)plantshavesignificantadvantagesforefficientpowergen- eration withcarboncapture.Moreover,withthedevelopmentofaccurateCFDmodelsforgasificationand combined cyclecombustion,keyunitsoftheseprocessescannowbemodeledmoreaccurately.However, the integrationofCFDmodelswithinsteady-stateprocesssimulators,andsubsequentoptimizationof the integratedsystem,stillpresentssignificantchallenges.Thisstudydescribesthedevelopmentand demonstration ofareducedordermodeling(ROM)frameworkforthesetasks.Theapproachbuildson the conceptsofco-simulationandROMdevelopmentforprocessunitsdescribedinearlierstudies.Here we showhowtheROMsderivedfrombothgasificationandcombustionunitscanbeintegratedwithin an equation-orientedsimulationenvironmentfortheoveralloptimizationofanIGCCprocess.Inaddi- tion toasystematicapproachtoROMdevelopment,theapproachincludesvalidationtasksfortheCFD model aswellasclosed-looptestsfortheintegratedflowsheet.Thisapproachallowstheapplicationof equation-based nonlinearprogrammingalgorithmsandleadstofastoptimizationofCFD-basedprocess flowsheets. TheapproachisillustratedontwoflowsheetsbasedonIGCCtechnology.

Lang, Y.; Zitney, S.; Biegler, L.

2011-01-01T23:59:59.000Z

286

Lied Animal Shelter Animal campus Renewable Energy Demonstration Project  

DOE Green Energy (OSTI)

The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

Randy Spitzmesser, AIA

2005-11-22T23:59:59.000Z

287

Lied Animal Shelter Animal campus Renewable Energy Demonstration Project  

SciTech Connect

The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

Randy Spitzmesser, AIA

2005-11-22T23:59:59.000Z

288

International Smart Grid Demonstration Project Case Studies and Survey Analysis  

Science Conference Proceedings (OSTI)

Electric utilities around the world are assessing the technical issues and the prospective benefits and costs of modernizing the electric grid. This report summarizes research conducted on international smart grid demonstrations that were tasked with communicating results and lessons learned, and it highlightsthree case studies where this information has been conveyed. The research involved a literature review of publicly available information and a smart grid international survey answered by ...

2013-03-27T23:59:59.000Z

289

Southern California Edison Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Company Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $40,134,700.00 Total Project Value $80,269,400.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

290

Beacon Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Beacon Power Corporation Beacon Power Corporation Country United States Headquarters Location Tyngsboro, Massachusetts Recovery Act Funding $24,063,978.00 Total Project Value $48,127,957.00 Coordinates 42.6767568°, -71.4245085° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

291

The Detroit Edison Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Detroit Edison Company The Detroit Edison Company Country United States Headquarters Location Detroit, Michigan Recovery Act Funding $4,995,271.00 Total Project Value $10,877,258.00 Coordinates 42.331427°, -83.0457538° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

292

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

NSTAR Electric & Gas Corporation NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $2,362,000.00 Total Project Value $4,724,000.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

293

Pacific Gas & Electric Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Pacific Gas & Electric Company Pacific Gas & Electric Company Country United States Headquarters Location San Francisco, California Recovery Act Funding $25,000,000.00 Total Project Value $355,938,600.00 Coordinates 37.7749295°, -122.4194155° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

294

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Lead NSTAR Electric & Gas Corporation Lead NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $5,267,592.00 Total Project Value $10,535,184.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

295

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988  

Science Conference Proceedings (OSTI)

This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

Not Available

1991-01-01T23:59:59.000Z

296

Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project  

SciTech Connect

The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-?based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-?hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-?based energy recovery and storage system. This technology is being developed at TDIs facilities to capture and reuse the energy necessary for the companys core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-?hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries to utilize energy recycling technology to lower domestic energy use and see higher net energy efficiency. The prototype system and results will be used to seek additional resources to carry out full deployment of a system. Ultimately, this innovative technology is expected to be transferable to other testing applications involving energy-?based cycling within the company as well as throughout the industry.

Bigelow, Erik

2012-10-30T23:59:59.000Z

297

BACA Project: geothermal demonstration power plant. Final report  

DOE Green Energy (OSTI)

The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

Not Available

1982-12-01T23:59:59.000Z

298

Heber geothermal binary demonstration project: Unavailability distributions for principal pumps  

DOE Green Energy (OSTI)

The purpose of this study has been to review data sources relevant to the failure rate and mean time to repair for the principal pumps of the Heber geothermal project. Based upon that review the distributions of failure rates, repair times and pump unavailability were established. A total of 16 pumps are represented in this study. The method used to develop data distributions has been to first review as many sources of pump data as are currently available. This review was followed by a study of the features of the pumps specified for the Heber installation and the effects of operation and the environment on those features as they relate to anticipated failure rates and repair times. From this, determinations were made for mean failure rate and repair time values appropriate to specific Heber pumps. Range factors are then selected and used to establish the expected variability of the data. Failure rates and repair times were then combined to obtain the unavailability distribution of each type of pump.

Mulvihill, Robert J.; Cleveland, Edward B.

1982-04-01T23:59:59.000Z

299

NETL: Clean Coal Technology Demonstration Program (CCTDP) - Round...  

NLE Websites -- All DOE Office Websites (Extended Search)

Comprehensive Report to Congress Comprehensive Report to Congress on the Clean Coal Technology Program: Pion Pine IGCC Power Project PDF-335KB (June 1992) PAPERS AND...

300

Integrated passive-solar demonstration project. Final report  

Science Conference Proceedings (OSTI)

The objectives of the study reported were to collect data on a combination of several passive solar heating and cooling systems. A passive solar test structure was constructed and monitored and the demonstration of passive systems designed into the structure was evaluated. Passive solar cooling principles include: shading all mass walls and windows from direct solar gain, maintaining cool attic and ceiling temperatures using solar induced ventilation, maintaining cool mean radiant wall temperatures, recirculating internal air, and using natural cross-ventilation through the conditioned space in spring and fall. Passive solar heating principles include: orientation of windows and sunspaces towards the south, providing double pane south windows, providing a double pane solar sunspace, using night insulation over glazing, extended thermal storage mass, and using a fan-forced rock/earth/air storage system. (LEW)

Garrison, M.L.

1982-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

BACA Project: geothermal demonstration power plant. Final report  

SciTech Connect

The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

1982-12-01T23:59:59.000Z

302

SustainX, Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

SustainX, Inc. Smart Grid Demonstration Project SustainX, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead SustainX, Inc. Country United States Headquarters Location West Lebanon, New Hampshire Recovery Act Funding $5,396,023.00 Total Project Value $10,792,045.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The SustainX, Inc. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in West Lebanon, New Hampshire. Overview Design, build, and deploy a utility-scale, low-cost compressed air energy storage system to support the integration of renewable energy sources onto the grid. The 1 MW/4hr system will store potential energy in the form of compressed air in above-ground industrial pressure facilities. The

303

Tidd PFBC demonstration project. Quarterly report, October--December 1993  

SciTech Connect

This is the 27th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1993 to December 31, 1993. Major activities during this period involve: (1) The unit operated for 720 hours on coal. (2) There were five gas turbine starts, five bed preheater starts, and three operating periods on coal fire. (3) During the quarter, total gross generation was 36,672 MWH, the peak unit output for one hour was 64 MWH, and the coal consumption was 17,251 tons. (4) Six performance tests were run during this quarter. (5) The unit was tested with four sorbent feed points. (6) The gas turbine low pressure compressor was disassembled to repair cracks in the stationary guide vanes; and (7) a request was sent to the DOE requesting funding for an additional year of operation. Major items planned for the next period include: (a) Continuation of sorbent utilization tests at various bed levels and sulfur retention values and with different coals and adsorbents; and (b) operation at full load.

Not Available

1994-01-01T23:59:59.000Z

304

Improved sulfur removal processes evaluated for IGCC  

SciTech Connect

An inherent advantage of Integrated Coal Gasification Combined Cycle (IGCC) electric power generation is the ability to easily remove and recover sulfur. During the last several years, a number of new, improved sulfur removal and recovery processes have been commercialized. An assessment is given of alternative sulfur removal processes for IGCC based on the Texaco coal gasifier. The Selexol acid gas removal system, Claus sulfur recovery, and SCOT tail gas treating are currently used in Texaco-based IGCC. Other processes considered are: Purisol, Sulfinol-M, Selefning, 50% MDEA, Sulften, and LO-CAT. 2 tables.

1986-12-01T23:59:59.000Z

305

Development of the Decontamination Approach for the West Valley Demonstration Project Decontamination Project Plan  

SciTech Connect

This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary mission at the WVDP is to solidify high-level liquid nuclear waste safely; transport the high-level waste (HLW) to a federal repository; and decontaminate and decommission the facilities and hardware used to solidify the HLW and conduct the WVDP. This includes a provision for the disposal of low-level waste (LLW) and transuranic waste (TRU) produced during processing of the HLW. Continuation of the effort to reduce the hazard and risk associated with historic operations to the extent needed to ensure the health and safety of the public and the environment will see a change in focus from stabilization of liquid HLW to stabilization of former plutonium and uranium extraction (PUREX) reprocessing plant facilities. This will be achieved through the activities of in-cell component removal and packaging, and preparation for long-term disposal of the long- lived radionuclides. These radionuclides are associated with the former PUREX facility operations, including, and upstream from, facilities utilized in the primary separation and first plutonium/uranium split cycles. The closure strategy for the WVDP is subject to ongoing evaluation and decision-making involving DOE and NYSERDA. Implementation will be subject to a future Record of Decision (ROD) and an Environmental Impact Statement (EIS).

Milner, T. N.; Watters, W. T.

2002-02-25T23:59:59.000Z

306

D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project - Technology Demonstration of Fixatives Applied Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms Many facilities slated for D&D across the DOE complex pose hazards (radiological, chemical, and structural) which prevent the use of traditional manual techniques. D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms More Documents & Publications Demonstration of Fixatives to Control Contamination and Accelerate D&D Demonstration of DeconGel (TM) at the Oak Ridge National Laboratory Building 2026 D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms

307

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2006 Progress Update (Presentation)  

DOE Green Energy (OSTI)

This presentation, given by NREL's Keith Wipke at EVS-22, provides an update on the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.

2006-10-26T23:59:59.000Z

308

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Data Analysis Overview; Preprint  

DOE Green Energy (OSTI)

Paper for the 2005 National Hydrogen Association conference provides an overview of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Welch, C.; Wipke, K.; Gronich, S.; Garbak, J.

2005-03-01T23:59:59.000Z

309

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update (Presentation)  

DOE Green Energy (OSTI)

Presentation outlining the progress of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, prepared for the 2006 National Hydrogen Association Meeting.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak. J.; Hooker, D.

2006-03-13T23:59:59.000Z

310

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update (Presentation)  

DOE Green Energy (OSTI)

Presentation outlining the progress of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, prepared for the 2006 National Hydrogen Association Meeting.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak. J.; Hooker, D.

2006-01-01T23:59:59.000Z

311

CURRENT AND FUTURE IGCC TECHNOLOGIES:  

NLE Websites -- All DOE Office Websites (Extended Search)

16, 2008 16, 2008 DOE/NETL-2008/1337 A Pathway Study Focused on Non-Carbon Capture Advanced Power Systems R&D Using Bituminous Coal - Volume 1 Current and Future IGCC Technologies Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or

312

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) announces a collaborative project with Research Triangle Institute (RTI) International to design, build, and test a warm gas cleanup system to remove multiple contaminants from coal-derived syngas. The 50-MWe system will include technologies to remove trace elements such as mercury and arsenic, capture the greenhouse gas carbon dioxide (CO2), and extract more than 99.9 percent of the sulfur from the syngas. A novel process to convert the extracted sulfur to a pure elemental sulfur product will also be tested. This project supports DOE's vision of coal power plants with near-zero

313

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) announces a collaborative project with Research Triangle Institute (RTI) International to design, build, and test a warm gas cleanup system to remove multiple contaminants from coal-derived syngas. The 50-MWe system will include technologies to remove trace elements such as mercury and arsenic, capture the greenhouse gas carbon dioxide (CO2), and extract more than 99.9 percent of the sulfur from the syngas. A novel process to convert the extracted sulfur to a pure elemental sulfur product will also be tested. This project supports DOE's vision of coal power plants with near-zero

314

Clean Coal Technology Demonstration Projects -- Operating Experience and Risk Assessment Through September 1998  

Science Conference Proceedings (OSTI)

Clean coal technologies such as Integrated Gasification Combined Cycle (IGCC) and Pressurized Fluidized Bed Combustion (PFBC) can meet stringent emission standards and achieve high efficiencies. Commercial and near-commercial sized plants using these technologies have accumulated several years of operational experience and are serious candidates for new coal-based power plants.

1998-12-18T23:59:59.000Z

315

Southern California Edison (SCE) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Southern California Edison (SCE) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed genera...

2010-07-27T23:59:59.000Z

316

Sacramento Municipal Utility District Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Sacramento Municipal Utility District Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institutes (EPRIs) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 21 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, ...

2011-08-05T23:59:59.000Z

317

Electricite' de France (EDF) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Electricit de France (EDF) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institutes (EPRIs) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and dist...

2009-09-16T23:59:59.000Z

318

KCP&L Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report describes the Kansas City Power and Light (KCP&L) Smart Grid demonstration host-site project as part of the Electric Power Research Institutes (EPRIs) five-year Smart Grid demonstration initiative. The EPRI initiative includes core Smart Grid research and several large-scale Smart Grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distributed renewab...

2010-04-01T23:59:59.000Z

319

FirstEnergy Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the FirstEnergy Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institutes (EPRIs) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewabl...

2009-09-24T23:59:59.000Z

320

American Electric Power (AEP) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the American Electric Power (AEP) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and di...

2009-09-16T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Hydro-Quebec Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report describes the Hydro Qubec Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and several large-scale smart grid projects with 21 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a...

2011-08-08T23:59:59.000Z

322

Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in COAL IGCC Powerplants  

SciTech Connect

The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, has been re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for Coal IGCC powerplants. The new program has been re-titled as ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants'' to better match the new scope. This technical progress report summarizes the work accomplished in the reporting period April 1, 2004 to August 31, 2004 on the revised Re-Directed and De-Scoped program activity. The program Tasks are: Task 1--IGCC Environmental Impact on high Temperature Materials: This first materials task has been refocused to address Coal IGCC environmental impacts on high temperature materials use in gas turbines and remains in the program. This task will screen material performance and quantify the effects of high temperature erosion and corrosion of hot gas path materials in Coal IGCC applications. The materials of interest will include those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: This second task develops and demonstrates new sensor technologies to determine the in-service health of advanced technology Coal IGCC powerplants, and remains in the program with a reduced scope. Its focus is now on only two critical sensor need areas for advanced Coal IGCC gas turbines: (1) Fuel Quality Sensor for detection of fuel impurities that could lead to rapid component degradation, and a Fuel Heating Value Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware.

Kenneth A. Yackly

2004-09-30T23:59:59.000Z

323

Five kW Solid Oxide Fuel Cell Demonstration Project: Case Study: Exit Glacier Nature Center Acumentrics Demonstration  

Science Conference Proceedings (OSTI)

This case study documents the demonstration experiences and lessons learned from a 5 kW solid oxide fuel cell system operating on propane at the Kenai Fiords National Park at the Exit Glacier Visitor Center, Seward, Alaska. The case study is one of several fuel cell project case studies under research by EPRI's Distributed Energy Resources Program. This case study is designed to help utilities and other interested parties understand the early applications of fuel cell systems to help them in their resour...

2005-02-17T23:59:59.000Z

324

Avestar® - Integrated Gasification Combined Cycle (IGCC) Dynamic Simulator  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Gasification Combined Cycle (IGCC) Dynamic Simulator Integrated Gasification Combined Cycle (IGCC) Dynamic Simulator The AVESTAR® center offers courses using the Integrated Gasification Combined Cycle (IGCC) Dynamic Simulator. The IGCC simulator builds on and reaches beyond existing combined-cycle and conventional-coal power plant simulators to combine--for the first time--a Gasification with CO2 Capture process simulator with a Combined-Cycle power simulator together in a single dynamic simulation framework. The AVESTAR® center IGCC courses provide unique, comprehensive training on all aspects of an IGCC plant, illustrating the high-efficiency aspects of the gasifier, gas turbine, and steam turbine integration. IGCC Operator training station HMI display for overview of IGCC Plant - Train A Reference:

325

Coal Fleet Integrated Gasification Combined Cycle (IGCC Permitting) Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance to owners of planned Integrated Gasification Combined Cycle (IGCC) power plants in order to assist them in permitting these advanced coal power generation facilities. The CoalFleet IGCC Permitting Guidelines summarize U.S. federal requirements for obtaining air, water, and solid waste permits for a generic IGCC facility, as described in the CoalFleet User Design Basis Specification (UDBS). The report presents characteristics of IGCC emissions that must be considered in the p...

2006-03-14T23:59:59.000Z

326

The Sydney 2000 World Weather Research Programme Forecast Demonstration Project: Overview and Current Status  

Science Conference Proceedings (OSTI)

The first World Weather Research Programme (WWRP) Forecast Demonstration Project (FDP), with a focus on nowcasting, was conducted in Sydney, Australia, from 4 September to 21 November 2000 during a period associated with the Sydney 2000 Olympic ...

T. Keenan; P. Joe; J. Wilson; C. Collier; B. Golding; D. Burgess; P. May; C. Pierce; J. Bally; A. Crook; A. Seed; D. Sills; L. Berry; R. Potts; I. Bell; N. Fox; E. Ebert; M. Eilts; K. O'Loughlin; R. Webb; R. Carbone; K. Browning; R. Roberts; C. Mueller

2003-08-01T23:59:59.000Z

327

Verification of Nowcasts from the WWRP Sydney 2000 Forecast Demonstration Project  

Science Conference Proceedings (OSTI)

The verification phase of the World Weather Research Programme (WWRP) Sydney 2000 Forecast Demonstration Project (FDP) was intended to measure the skill of the participating nowcast algorithms in predicting the location of convection, rainfall ...

Elizabeth E. Ebert; Laurence J. Wilson; Barbara G. Brown; Pertti Nurmi; Harold E. Brooks; John Bally; Matthias Jaeneke

2004-02-01T23:59:59.000Z

328

FCV Learning Demonstration: Project Midpoint Status and First-Generation Vehicle Results; Preprint  

DOE Green Energy (OSTI)

This paper covers the progress accomplished by the U.S. DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project since inception, including results from analysis of six months of new data.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

329

Hydrogen Learning Demonstration Project: Fuel Cell Efficiency and Initial Durability (Presentation)  

Science Conference Proceedings (OSTI)

This presentation by NREL's Keith Wipke at the 2006 Fuel Cell Seminar provides information about the Hydrogen Learning Demonstration Project, with a focus on fuel cell efficiency and durability.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.

2006-11-15T23:59:59.000Z

330

Design Options for Enhancing IGCC Flexible Operations Performance and Economics  

Science Conference Proceedings (OSTI)

This report describes the cycling experience of integrated gasification combined cycle (IGCC) plants, and the characteristics of IGCC and its component technologies that can make it particularly responsive to renewables-driven, flexible operation and cycling requirements. It also identifies a number of design options for optimizing IGCC cycling performance, and economics for such requirements to nearly meet natural gas combined cycle (NGCC) ramping ...

2013-12-13T23:59:59.000Z

331

Guidebook for Cost/Benefit Analysis of Smart Grid Demonstration Projects  

Science Conference Proceedings (OSTI)

This report presents a step-by-step process for estimating the costs and benefits associated with smart grid demonstration projects. The entire guidebook is meant to function as a stand-alone users manual for the analysis process, from the initial step of describing the project to the final step of communicating the results to all stakeholders. This version of the guidebook presents detailed instructions for describing the project objectives, the research plan, and the technologies deployed; ...

2013-12-16T23:59:59.000Z

332

Baca geothermal demonstration project. Quarterly technical progress report, October 1-December 31, 1980  

SciTech Connect

Work completed on the Baca 50 Megawatt (MWe) Geothermal Demonstration Power Plant Project, Baca Location No. 1, New Mexico is reported. Topics covered in this quarterly report include progress made in the well and steam production systems, the power plant and transmission systems, and in the project data management program.

1981-03-01T23:59:59.000Z

333

Design optimization of IGCC power plants  

SciTech Connect

Integrated gasification-combined-cycle (IGCC) power plants have the potential for providing performance and cost improvements over conventional coal-fired steam power plants with flue-gas desulfurization. The major design options for IGCC power plants include the following: oxygen-blown versus air-blown gasification processes; entrained-flow, fluidized-bed, or fixed-bed gasifier; coal-slurry feed versus coal-dry feed; hot versus cold fuel-gas cleanup; gas turbine alternatives; and, design alternatives for the Heat Recovery Steam Generator (HRSG). This paper summarizes some results from these studies. The advanced thermoelectric techniques used at Tennessee Technological University (TTU) are very powerful tools for evaluating and optimizing IGCC power plants.

Tsatsaronis, G.; Lin, L.; Pisa, J.; Tawfik, T. (Tennessee Technological Univ., Cookeville, TN (United States))

1992-01-01T23:59:59.000Z

334

IGCC update: are we there yet?  

Science Conference Proceedings (OSTI)

If a number of technical, financial and regulatory hurdles can be overcome, power generated by integrated gasification combined-cycle technology could become an important source for US utilities. Our overview presents diverse perspectives from three industry experts about what it will take to move this technology off the design table and into the field. Well-known advantages are IGCC uses less water, creates a usable slag by-product and the technology required for pre-combustion CO{sub 2} capture has already been used successfully on coal gasification technology. These points, together with roadblocks to the deployment of IGCC technology in the USA, are discussed. 3 figs., 1 tab.

Neville, A.

2009-08-15T23:59:59.000Z

335

Reasons for the termination of, and DOE losses in, a geothermal demonstration powerplant project  

DOE Green Energy (OSTI)

The 50-megawatt Baca geothermal demonstration powerplant project, located in northern New Mexico, was the Department of Energy's (DOE's) initial effort to demonstrate geothermal powerplant technology. The project, started in 1978, was believed to have a high probability of success, and its cost was to be shared equally with the industry participants. GAO's review showed that the project was terminated in January 1982 because sufficient geothermal steam to operate the powerplant could not be obtained. The early termination resulted in DOE paying a disproportionate share - $45 million, or 64% - of the $70 million spent on the project because it had paid the majority of the powerplant-related costs at that time. However, a portion of these costs may be recovered through the sale of powerplant equipment. DOE indicated that it learned lessons from this experience and will act to prevent these problems from occurring on other projects.

Not Available

1983-09-29T23:59:59.000Z

336

Shared savings and low income homeowners: Results of a demonstration project in Hennepin County  

SciTech Connect

In 1984 Hennepin County, with financial support from the US Department of Energy and as part of the Year Five energy program of the Urban Consortium's Energy Task Force, initiated a Residential Shared Savings Demonstration Project (RSSDP) for single family homeowners. Shared savings, or performance contracting, occurs when an energy service company (ESCo) finances and installs energy improvements in a customer's property and receives a share of the savings that result over time as their compensation. Chapter 1 of this report provides general background on the project, including a brief description of Hennepin County, the energy environment within which the project was conducted, and the Residential Shared Savings Demonstration Project. Chapter 2 describes the efforts to market the RSSDP to low income homeowners, the results of those efforts and the findings from an extensive market assessment effort. Chapter 3 summarizes the significant lessons learned during the project. 4 figs., 3 tabs.

Miller, R.D.; Ford, J.M.

1986-04-01T23:59:59.000Z

337

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

338

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drilling Projects Demonstrate Significant CO2 Storage Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

339

Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981  

DOE Green Energy (OSTI)

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

1981-06-01T23:59:59.000Z

340

Heber geothermal binary demonstration project. Quarterly technical progress report, April 1, 1981-June 30, 1981  

SciTech Connect

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1981, through June 30, 1981 is documented. Topics covered include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Van De Mark, G.D.

1981-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The Nucla Circulating Fluidized-Bed Demonstration Project: A U.S. DOE post-project assessment  

Science Conference Proceedings (OSTI)

This report is a post-project assessment of the Nucla Circulating Fluidized-Bed (CFB) Demonstration Project, the second project to be completed in the DOE Clean Coal Technology Program. Nucla was the first successful utility repowering project in the US, increasing the capacity of the original power station from 36 MW(e) to 110 MW(e) and extending its life by 30 years. In the CFB boiler, combustion and desulfurization both take place in the fluidized bed. Calcium in the sorbent captures sulfur dioxide and the relatively low combustion temperatures limit NOx formation. Hot cyclones separate the larger particles from the gas and recirculates them to the lower zones of the combustion chambers. This continuous circulation of coal char and sorbent particles is the novel feature of CFB technology. This demonstration project significantly advanced the environmental, operational, and economic potential of atmospheric CFB technology, precipitating a large number of orders for atmospheric CFB equipment. By 1994, more than 200 atmospheric CFB boilers have been constructed worldwide. Although at least six CFB units have been operated, the Nucla project`s CFB database continues to be an important and unique resource for the design of yet larger atmospheric CFB systems. The post-project assessment report is an independent DOE appraisal of the success a completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology as well as an analysis of the commercial market.

NONE

1995-06-01T23:59:59.000Z

342

Clean Coal Power Initiative Round 1 Demonstration Projects Applying Advanced Technologies to Lower Emissions  

NLE Websites -- All DOE Office Websites (Extended Search)

7 JUNE 2012 7 JUNE 2012 Clean Coal Power Initiative Round 1 Demonstration Projects Applying Advanced Technologies to Lower Emissions and Improve Efficiency 2 Cover Photos: * Top left: Great River Energy's Coal Creek Station * Top right: We Energy's Presque Isle Power Plant * Bottom: Dynegy's Baldwin Energy Complex A report on three projects conducted under separate cooperative agreements between the U.S. Department of Energy and: * Great River Energy * NeuCo. , Inc. * WeEnergies 3 Executive Summary 4 Clean Coal Technology Demonstration Program 5 CCPI Program 6 Demonstration of Integrated Optimization Software at

343

DOE Funds 21 Research, Development and Demonstration Projects for up to $78  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funds 21 Research, Development and Demonstration Projects for Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems October 6, 2008 - 4:14pm Addthis RENO, Nev. - Today at the National Geothermal Conference in Reno, Nev., Deputy Assistant Secretary for Renewable Energy Steve Chalk announced the U.S. Department of Energy's (DOE) awards under a Funding Opportunity Announcement (FOA) for research, development and demonstration of Enhanced Geothermal Systems (EGS) for next-generation geothermal energy technologies. Subject to annual appropriations, the Department will provide up to $43.1 million over four years to 21 awardees, including a

344

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project DOE Manual 435.1-1 Waste West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations The U.S. Department of Energy (DOE) Manual 435.1-1, Radioactive Waste Management Manual, which accompanies DOE Order 435.1, provides that the DOE may determine that certain waste from reprocessing spent nuclear fuel is waste incidental to reprocessing, is not high-level waste and may be managed and disposed of as low-level waste if the waste meets the criteria in DOE Manual 435.1-1, Chapter II, Section B. To determine that waste is incidental to reprocessing using the evaluation process from the Manual, and shall be managed as low level waste, DOE must demonstrate three

345

CERAMIC MEMBRANE ENABLING TECHNOLOGY FOR IMPROVED IGCC EFFICIENCY  

SciTech Connect

The objective of this program is to conduct a technology development program to advance the state-of-the-art in ceramic Oxygen Transport Membranes (OTM) to the level required to produce step change improvements in process economics, efficiency, and environmental benefits for commercial IGCC systems and other applications. The IGCC program is focused on addressing key issues in materials, processing, manufacturing, engineering and system development that will make the OTM a commercial reality. The objective of the OTM materials development task is to identify a suitable material that can be formed into a thin film to produce the target oxygen flux. This requires that the material have an adequate permeation rate, and thermo-mechanical and thermo-chemical properties such that the material is able to be supported on the desired substrate and sufficient mechanical strength to survive the stresses involved in operation. The objective of the composite OTM development task is to develop the architecture and fabrication techniques necessary to construct stable, high performance, thin film OTMs supported on suitable porous, load bearing substrates. The objective of the process development task of this program to demonstrate the program objectives on a single OTM tube under test conditions simulating those of the optimum process cycle for the power plant. Good progress has been made towards achieving the DOE-IGCC program objectives. Two promising candidates for OTM materials have been identified and extensive characterization will continue. New compositions are being produced and tested which will determine if the material can be further improved in terms of flux, thermo-mechanical and thermo-chemical properties. Process protocols for the composite OTM development of high quality films on porous supports continues to be optimized. Dense and uniform PSO1 films were successfully applied on porous disc and tubular substrates with good bonding between the films and substrates, and no damage to the substrates or films.

Ravi Prasad

2000-04-01T23:59:59.000Z

346

Pacific Northwest GridWise Testbed Demonstration Projects; Part I. Olympic Peninsula Project  

Science Conference Proceedings (OSTI)

This report describes the implementation and results of a field demonstration wherein residential electric water heaters and thermostats, commercial building space conditioning, municipal water pump loads, and several distributed generators were coordinated to manage constrained feeder electrical distribution through the two-way communication of load status and electric price signals. The field demonstration took place in Washington and Oregon and was paid for by the U.S. Department of Energy and several northwest utilities. Price is found to be an effective control signal for managing transmission or distribution congestion. Real-time signals at 5-minute intervals are shown to shift controlled load in time. The behaviors of customers and their responses under fixed, time-of-use, and real-time price contracts are compared. Peak loads are effectively reduced on the experimental feeder. A novel application of portfolio theory is applied to the selection of an optimal mix of customer contract types.

Hammerstrom, Donald J.; Ambrosio, Ron; Carlon, Teresa A.; DeSteese, John G.; Horst, Gale R.; Kajfasz, Robert; Kiesling, Laura L.; Michie, Preston; Pratt, Robert G.; Yao, Mark; Brous, Jerry; Chassin, David P.; Guttromson, Ross T.; Jarvegren, Olof M.; Katipamula, Srinivas; Le, N. T.; Oliver, Terry V.; Thompson, Sandra E.

2008-01-09T23:59:59.000Z

347

Kansas City Power & Light Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Kansas City Power & Light Company Country United States Headquarters Location Kansas City, Missouri Recovery Act Funding $23,940,112.00 Total Project Value $48,125,315.00 Coordinates 39.0997265°, -94.5785667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

348

Los Angeles Department of Water and Power Smart Grid Demonstration Project  

Open Energy Info (EERE)

Angeles Department of Water and Power Smart Grid Demonstration Project Angeles Department of Water and Power Smart Grid Demonstration Project Jump to: navigation, search Project Lead Los Angeles Department of Water and Power Country United States Headquarters Location Los Angeles, California Recovery Act Funding $60,280,000.00 Total Project Value $120,560,000.00 Coordinates 34.0522342°, -118.2436849° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

349

Power Authority of the State of New York Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of the State of New York Smart Grid Demonstration Project of the State of New York Smart Grid Demonstration Project Jump to: navigation, search Project Lead Power Authority of the State of New York Country United States Headquarters Location White Plains, New York Recovery Act Funding $720,000.00 Total Project Value $1,440,000.00 Coordinates 41.0339862°, -73.7629097° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

350

New York State Electric & Gas Corporation Smart Grid Demonstration Project  

Open Energy Info (EERE)

New York State Electric & Gas Corporation Smart Grid Demonstration Project New York State Electric & Gas Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead New York State Electric & Gas Corporation Country United States Headquarters Location Binghamton, New York Recovery Act Funding $29,561,142.00 Total Project Value $125,006,103.00 Coordinates 42.0986867°, -75.9179738° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

351

Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project  

DOE Green Energy (OSTI)

Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

1980-05-01T23:59:59.000Z

352

Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project  

DOE Green Energy (OSTI)

Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

1980-05-01T23:59:59.000Z

353

Guidebook for Cost/Benefit Analysis of Smart Grid Demonstration Projects  

Science Conference Proceedings (OSTI)

This report presents a step-by-step process for estimating the costs and benefits associated with Smart Grid demonstration projects. In its entirety, the guidebook is meant to function as a standalone users manual for the analysis process, from the initial step of describing the project to the final step of communicating the results to all stakeholders. This revision of the Guidebook updates and supersedes the material in the original Volume 1, published in 2011, but goes further by adding ...

2012-12-12T23:59:59.000Z

354

Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project  

SciTech Connect

The U.S. Department of Energy (DOE) is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service (NPS) views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other NPS tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr for this tunnel to a much larger figure national

Tuenge, Jason R.

2011-06-01T23:59:59.000Z

355

Final Report on the PREMIO Experimental Results: EDF Smart Grid Demonstration Project  

Science Conference Proceedings (OSTI)

PREMIO is a French acronym for Production Rpartie, Enr et MDE, Intgres et Optimises or in English, Integration and Optimization of DG, DSM & Renewable Energies. The term PREMIO is used in this document in reference to the project and the working consortium, as well as the Virtual Power Plant. Electricit de France (EDF) supports the PREMIO demonstration project in the south of France. PREMIO combines the control of installed ...

2013-11-25T23:59:59.000Z

356

Operational Awareness Oversight of the West Valley Demonstration Project, July 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WVDP-2012-07-30 WVDP-2012-07-30 Site: West Valley Demonstration Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations (HS-45) Activity Report for Operational Awareness Oversight of the West Valley Demonstration Project Dates of Activity : 07/30/2012 Report Preparer: Joseph P. Drago Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was for the HS-45 Site Lead to meet with Department of Energy (DOE) site personnel, tour the facilities, and obtain a status report on the upcoming activities at the West Valley Demonstration Project (WVDP). Major decommissioning activities underway include removal of asbestos-containing materials, disassembly of the dissolver,

357

Operational Awareness Oversight of the West Valley Demonstration Project, July 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

WVDP-2012-07-30 WVDP-2012-07-30 Site: West Valley Demonstration Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations (HS-45) Activity Report for Operational Awareness Oversight of the West Valley Demonstration Project Dates of Activity : 07/30/2012 Report Preparer: Joseph P. Drago Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was for the HS-45 Site Lead to meet with Department of Energy (DOE) site personnel, tour the facilities, and obtain a status report on the upcoming activities at the West Valley Demonstration Project (WVDP). Major decommissioning activities underway include removal of asbestos-containing materials, disassembly of the dissolver,

358

Los Alamos National Laboratory Tritium Technology Deployments Large Scale Demonstration and Deployment Project  

Science Conference Proceedings (OSTI)

This paper describes the organization, planning and initial implementation of a DOE OST program to deploy proven, cost effective technologies into D&D programs throughout the complex. The primary intent is to accelerate closure of the projects thereby saving considerable funds and at the same time being protective of worker health and the environment. Most of the technologies in the ''toolkit'' for this program have been demonstrated at a DOE site as part of a Large Scale Demonstration and Deployment Project (LSDDP). The Mound Tritium D&D LSDDP served as the base program for the technologies being deployed in this project but other LSDDP demonstrated technologies or ready-for-use commercial technologies will also be considered. The project team will evaluate needs provided by site D&D project managers, match technologies against those needs and rank deployments using a criteria listing. After selecting deployments the project will purchase the equipment and provide a deployment engineer to facilitate the technology implementation. Other cost associated with the use of the technology will be borne by the site including operating staff, safety and health reviews etc. A cost and performance report will be prepared following the deployment to document the results.

McFee, J.; Blauvelt, D.; Stallings, E.; Willms, S.

2002-02-26T23:59:59.000Z

359

ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT  

SciTech Connect

The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

Steve Bergin

2004-10-18T23:59:59.000Z

360

ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

Steve Bergin

2004-10-18T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 OF 3 DOE / EIS-0361 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Agency: U.S. Department of Energy Title: Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361) Location: Rainelle, West Virginia Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Roy Spears, Document Manager National Energy Technology Laboratory U.S. Department of Energy 3610 Collins Ferry Road

362

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2009; Composite Data Products, Final Version March 19, 2009  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-03-01T23:59:59.000Z

363

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project; Spring 2008 Composite Data Products, Final Version: February 29, 2008  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through February 2008.

Wipke, K.; Sprik, S.; Kurtz J.

2008-04-01T23:59:59.000Z

364

Entering a New Stage of Learning from the U.S. Fuel Cell Electric Vehicle Demonstration Project (Presentation)  

DOE Green Energy (OSTI)

This presentation summarizes Entering a New Stage of Learning from the U.S. Fuel Cell Electric Vehicle Demonstration Project.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Garbak, J.

2010-11-08T23:59:59.000Z

365

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-09-01T23:59:59.000Z

366

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2010; Composite Data Products, Final Version March 29, 2010  

SciTech Connect

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2010.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-05-01T23:59:59.000Z

367

Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project  

DOE Green Energy (OSTI)

The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

Steve Bergin

2005-10-14T23:59:59.000Z

368

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 13, October 1993--December 1993  

Science Conference Proceedings (OSTI)

In Dec 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In November 1990, after a ten month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the thirteenth Technical Progress Report covering the period October 1, 1993 through the end of December 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in Aug 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1994-05-01T23:59:59.000Z

369

CERAMIC MEMBRANE ENABLING TECHNOLOGY FOR IMPROVED IGCC EFFICIENCY  

SciTech Connect

The objective of this program is to conduct a technology development program to advance the state-of-the-art in ceramic Oxygen Transport Membranes (OTM) to the level required to produce step change improvements in process economics, efficiency, and environmental benefits for commercial IGCC systems and other applications. The IGCC program is focused on addressing key issues in materials, processing, manufacturing, engineering and system development that will make the OTM a commercial reality. The objective of the OTM materials development task is to identify a suitable material that can be formed into a thin film to produce the target oxygen flux. This requires that the material have an adequate permeation rate, and thermo-mechanical and thermo-chemical properties such that the material is able to be supported on the desired substrate and sufficient mechanical strength to survive the stresses involved in operation. The objective of the composite OTM development task is to develop the architecture and fabrication techniques necessary to construct stable, high performance, thin film OTMs supported on suitable porous, load bearing substrates. The objective of the process development task of this program to demonstrate the program objectives on a single OTM tube under test conditions simulating those of the optimum process cycle for the power plant.

Ravi Prasad

2000-04-01T23:59:59.000Z

370

Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project  

SciTech Connect

The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented.

Vance, R.F.; Brill, B.A.; Carl, D.E. [and others

1997-06-01T23:59:59.000Z

371

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2008-12-17T23:59:59.000Z

372

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2007-09-27T23:59:59.000Z

373

Analysis and Forecasting of the Low-Level Wind during the Sydney 2000 Forecast Demonstration Project  

Science Conference Proceedings (OSTI)

During the Sydney 2000 Forecast Demonstration Project (FDP) a four-dimensional variational assimilation (4DVAR) scheme was run to analyze the low-level wind field with high spatial and temporal resolution. The 4DVAR scheme finds an optimal fit to ...

N. Andrew Crook; Juanzhen Sun

2004-02-01T23:59:59.000Z

374

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects  

Science Conference Proceedings (OSTI)

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

White, T.; Contos, L.

1991-09-01T23:59:59.000Z

375

West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005  

Science Conference Proceedings (OSTI)

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2006-09-21T23:59:59.000Z

376

West Valley Demonstration Project Administrative Consent Order, August 27, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project (WVDP) West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 State New York Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Establish commitments regarding compliance with the approved Site Treatment Plan (STP) regarding mixed waste stored and generated at the WVDP Parties DOE; New York State Department of Environmental Conservation (NYSDEC) Date 8/27/1996 SCOPE * Establish commitments regarding compliance with the approved Site Treatment Plan (STP) regarding mixed waste stored and generated at the WVDP. * Establish an enforceable framework in which DOE will develop and apply treatment or otherwise meet Land Disposal Restriction (LDR) requirements. * Provide for storage of current and projected LDR mixed wastes at the WVDP pending

377

Environmental Assessment for the Warren Station externally fired combined cycle demonstration project  

SciTech Connect

The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

NONE

1995-04-01T23:59:59.000Z

378

Electric Ground Support Equipment Advanced Battery Technology Demonstration Project at the Ontario Airport  

SciTech Connect

The intent of the electric Ground Support Equipment (eGSE) demonstration is to evaluate the day-to-day vehicle performance of electric baggage tractors using two advanced battery technologies to demonstrate possible replacements for the flooded lead-acid (FLA) batteries utilized throughout the industry. These advanced battery technologies have the potential to resolve barriers to the widespread adoption of eGSE deployment. Validation testing had not previously been performed within fleet operations to determine if the performance of current advanced batteries is sufficient to withstand the duty cycle of electric baggage tractors. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. The demonstration project also grew the relationship with Southwest Airlines (SWA), our demonstration partner at Ontario International Airport (ONT), located in Ontario, California. The results of this study have encouraged a proposal for a future demonstration project with SWA.

Tyler Gray; Jeremy Diez; Jeffrey Wishart; James Francfort

2013-07-01T23:59:59.000Z

379

Nome, Alaska, Wind Turbine Demonstration Project Finding of No Significant Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact Nome, Alaska, Wind Turbine Demonstration Project FINDING OF NO SIGNIFICANT IMPACT S U M M A R Y The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) to provide DOE and other public agency decision makers witb tbe environmental documentation required to take informed discretionary action on the proposed Nome, Alaska, Wind Turbine Demonstration Project (DOE/EA-1280). The EA assesses the potential environmental impacts and cumulative i m p a c t s that would result from the jnstallation and operation of wind turbines in Nome, Alaska DOE'S role in the proposed action would be limited to providing ,$ding assistance for a portion of the construction and demonstration of wind energy technology in the

380

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2MHILL B& W West Valley, LLC

2011-09-28T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

1992-03-01T23:59:59.000Z

382

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011  

Science Conference Proceedings (OSTI)

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2M HILL B& W West Valley, LLC

2012-09-27T23:59:59.000Z

383

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Rendall, John D. [CH2M HILL B& W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL B& W West Valley, LLC (CHBWV)

2013-09-19T23:59:59.000Z

384

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS Corporation

2010-09-17T23:59:59.000Z

385

CURRENT AND FUTURE IGCC TECHNOLOGIES:  

NLE Websites -- All DOE Office Websites (Extended Search)

future. On the other hand, the projected demand for electricity coupled with high fuel costs (particularly high oil prices and volatile natural gas prices) presents a near-term...

386

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2006 Progress Update  

DOE Green Energy (OSTI)

The U.S. Department of Energy (DOE) initiated the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project through a competitive solicitation process in 2003. The purpose of this project is to conduct an integrated field validation that simultaneously examines the performance of fuel cell vehicles and the supporting hydrogen infrastructure. Four industry teams have signed cooperative agreements with DOE and are supporting plans for more than 130 fuel cell vehicles and 20 hydrogen refueling stations over the 5-year project duration. This paper provides a status update covering the progress accomplished by the demonstration and validation project over the last six months; the first composite data products from the project were published in March 2006. The composite data products aggregate individual performance into a range that protects the intellectual property of the companies involved, while publicizing the progress the hydrogen and fuel cell industry is making as a whole relative to the program objectives and timeline. Updates to previously published composite data products, such as on-road fuel economy and vehicle/infrastructure safety, will be presented along with new composite data products, such as fuel cell stack efficiency and refueling behavior.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.

2006-10-01T23:59:59.000Z

387

IGCC: Current Status and Future Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of Developing Technologies on the Impact of Developing Technologies on the Economics and Performance of Future IGCC Power Plants John Plunkett, Noblis David Gray, Noblis Charles White, Noblis Julianne Klara, NETL Copyright © 2008 Noblis, Inc. 2 Acknowledgement This work is sponsored by the U.S. Department of Energy, National Energy Technology Laboratory 3 Study Objective Starting with present-day baseline, evaluate improved IGCC performance and cost resulting from DOE-funded R&D over the next 18 years. Examine both with and without CO 2 capture. Study results will help to prioritize technology development based on relative impact. Results will also help to assess the impact of future potential CO 2 emissions restrictions. 4 Methodology * Use Aspen Plus simulator to provide model "transparency"

388

COST OF MERCURY REMOVAL IN IGCC PLANTS  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost of Mercury Removal Cost of Mercury Removal in an IGCC Plant Final Report September 2002 Prepared for: The United States Department of Energy National Energy Technology Laboratory By: Parsons Infrastructure and Technology Group Inc. Reading, Pennsylvania Pittsburgh, Pennsylvania DOE Product Manager: Gary J. Stiegel DOE Task Manager: James R. Longanbach Principal Investigators: Michael G. Klett Russell C. Maxwell Michael D. Rutkowski PARSONS The Cost of Mercury Removal in an IGCC Plant Final Report i September 2002 TABLE OF CONTENTS Section Title Page 1 Summary 1 2 Introduction 3 3 Background 4 3.1 Regulatory Initiatives 4 3.2 Mercury Removal for Conventional Coal-Fired Plants 4 3.3 Mercury Removal Experience in Gasification 5 3.4 Variability of Mercury Content in Coal 6 4 Design Considerations 7 4.1 Carbon Bed Location

389

Commercial gasifier for IGCC applications study report  

SciTech Connect

This was a scoping-level study to identify and characterize the design features of fixed-bed gasifiers appearing most important for a gasifier that was to be (1) potentially commercially attractive, and (2) specifically intended for us in integrated coal gasification/combined-cycle (IGCC) applications. It also performed comparative analyses on the impact or value of these design features and on performance characteristics options of the whole IGCC system since cost, efficiency, environmental traits, and operability -- on a system basis -- are what is really important. The study also reviewed and evaluated existing gasifier designs, produced a conceptual-level gasifier design, and generated a moderately advanced system configuration that was utilized as the reference framework for the comparative analyses. In addition, technical issues and knowledge gaps were defined. 70 figs., 31 tabs.

Notestein, J.E.

1990-06-01T23:59:59.000Z

390

Design Options for Enhancing IGCC Flexible Operations Performance and Economics  

Science Conference Proceedings (OSTI)

This report describes the cycling experience of integrated-gasification combined-cycle (IGCC) plants and the characteristics of IGCC and its component technologies that can make it particularly responsive to renewables-driven, flexible operation and cycling requirements. It also identifies a number of design options for optimizing IGCC cycling performance and economics for such requirements.BackgroundIntermittent renewable sources, such as wind and solar ...

2012-12-31T23:59:59.000Z

391

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 12, July--September 1993  

Science Conference Proceedings (OSTI)

In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1993-12-31T23:59:59.000Z

392

IGCC Design Considerations for CO2 Capture  

Science Conference Proceedings (OSTI)

This report contains technical design, plant performance, cost estimates, and economic analysis of IGCC power plants designed with future retrofit for full CO2 capture in mind. The gasification technologies supplied by General Electric, Shell, and Siemens studied in the report were designed to initially produce power without CO2 capture; but their designs included moderate pre-investment to economically accommodate retrofit of full CO2 capture at a later date. The base plant designs include deep sulfur r...

2009-03-31T23:59:59.000Z

393

Microsoft Word - CurrentFutureIGCC2Revisionfinal.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

M M T R - 2 0 0 4 - 0 5 Mitretek Technical Report Current and Future IGCC Technologies: Bituminous Coal to Power AUGUST 2004 David Gray Salvatore Salerno Glen Tomlinson Customer: Concurrent Technology Corporation Customer Name Contract No.:001000045 Dept. No.: H050 H050 Project No.:0601CTC4 ©Year Mitretek Systems ©M Falls Church, Virginia ii Disclaimer This report was prepared as an account of work sponsored by an agency of the United States (U.S.) Government. Neither the U.S., nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

394

Technology qualification for IGCC power plant with CO2 Capture.  

E-Print Network (OSTI)

?? Summary:This thesis presents the technology qualification plan for the integrated gasification combined cycle power plant (IGCC) with carbon dioxide capture based on DNV recommendations. (more)

Baig, Yasir

2011-01-01T23:59:59.000Z

395

AVESTAR - Training - IGCC Orientation for Engineers and Managers  

NLE Websites -- All DOE Office Websites (Extended Search)

will introduce trainees to the IGCC simulator, process, and controls. During the training, trainees will startup and shutdown the simulated unit in an integrated manner and...

396

Coal gasification players, projects, prospects  

SciTech Connect

Integrated gasification combined cycle (IGCC) technology has been running refineries and chemical plants for decades. Power applications have dotted the globe. Two major IGCC demonstration plants operating in the United States since the mid-1900s have helped set the stage for prime time, which is now approaching. Two major reference plant designs are in the wings and at least two major US utilities are poised to build their own IGCC power plants. 2 figs.

Blankinship, S.

2006-07-15T23:59:59.000Z

397

Microsoft Word - 42651_UCI_ IGCC System Studies_rev060701.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1_UCI_ IGCC System Studies_rev060701.doc, Revised 7/06 1_UCI_ IGCC System Studies_rev060701.doc, Revised 7/06 Regents of the University of California, DE-FC26-05NT42652 (University of California Irvine, UCI) FACT SHEET I. PROJECT PARTICIPANTS A. Prime Participant: UCI, 300 University Tower, Irvine, CA 92697-7600 B. Sub-Award Participants: None II. PROJECT DESCRIPTION A. Objectives. Characterize advanced Brayton Cycles for coal derived fuels to be candidates for executing conceptual designs (systems studies). Develop conceptual plant designs for near term technologies followed by conceptual designs that integrate advanced technologies. In these studies identify key variables for purpose of sensitivity analysis used in a quest for establishing optimal cycles. Some examples of variables are firing temperature, pressure ratio, combustion

398

Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada  

DOE Green Energy (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

N /A

1999-02-22T23:59:59.000Z

399

West Valley demonstration project: alternative processes for solidifying the high-level wastes  

SciTech Connect

In 1980, the US Department of Energy (DOE) established the West Valley Solidification Project as the result of legislation passed by the US Congress. The purpose of this project was to carry out a high level nuclear waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The DOE authorized the Pacific Northwest Laboratory (PNL), which is operated by Battelle Memorial Institute, to assess alternative processes for treatment and solidification of the WNYNSC high-level wastes. The Process Alternatives Study is the suject of this report. Two pretreatment approaches and several waste form processes were selected for evaluation in this study. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied.

Holton, L.K.; Larson, D.E.; Partain, W.L.; Treat, R.L.

1981-10-01T23:59:59.000Z

400

2012 Annual Workforce Analysis and Staffing Plan Report - West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTACHMENT ATTACHMENT 1 Annual Workforce Analysis and Staffing Plan Report As ofDecember 31, 2012 Reporting Office: West Valley Demonstration Project Section 1: Current Mission(s) of the Organization and Potential Changes The mission of the WVDP as defined by the West Valley Demonstration Project Act (Public Law 96-368) is to accomplish five activities: 1) solidify high-level radioactive waste (HLW), 2) develop containers suitable for permanent disposal of the HLW, 3) transport the HLW to a Federal repository for permanent disposal, 4) dispose of low-level and transuranic waste produced by the solidification of the HLW, and 5) decontaminate and decommission the HLW tanks and facilities, materials and hardware used to solidify the HLW. DOE expects to accomplish these WVDP activities through proactive leadership, management, and implementation of safe and environmentally sound operations.

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responses to Public Comments on the Draft Waste- Responses to Public Comments on the Draft Waste- Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Concentrator Feed Makeup Tank and Melter Feed Hold Tank 1 Introduction The U.S. Department of Energy (DOE) is providing responses to the comments received from the public and from state and county agencies on the West Valley Demonstration Project (WVDP) Draft Waste-Incidental-to-Reprocessing (WIR) Evaluation for the Concentrator Feed Makeup Tank (CFMT) and the Melter Feed Hold Tank (MFHT), referred to hereafter as the Draft Evaluation. As a matter of policy and to provide greater transparency in its efforts to cleanup waste at the WVDP, DOE made the Draft Evaluation available for public and state review and comment, as

402

Comparison of Pratt and Whitney Rocketdyne IGCC and commercial IGCC performance  

Science Conference Proceedings (OSTI)

This report compares the performance and cost of commercial Integrated Gasification Combined Cycle (IGCC) plants using General Electric Energy (GEE) and Shell gasifiers with conceptual IGCC plant designs using the Pratt and Whitney Rocketdyne (PWR) compact gasifier. the PWR gasifier is also compared with the GEEE gasifier in hydrogen production and carbon capture mode. With the exception of the PWR gasifier, the plants are designed with commercially available equipment to be operational in approximately 2010. All results should be considered preliminary and dictated in large part by the selected design basis. 10 refs., 54 exhibits

Jeffrey Hoffmann; Jenny Tennant; Gary J. Stiegel [Office of Systems Analysis and Planning (United States)

2006-06-15T23:59:59.000Z

403

SRC-1: coal liquefaction demonstration plant. Project Baseline assessment report supplement  

Science Conference Proceedings (OSTI)

ICRC issued a Revised Baseline for the SRC-I Demonstration Project in order to incorporate the results of these research activities and the changes in the design that had occurred since FY82. The Revised Baseline, prepared by ICRC, provides the necessary information for any future government or commercial decisions relating to the design, construction and operation of an SRC-I-type coal liquefaction facility. No further activities to complete the design of the demonstration plant, or to proceed with construction are planned by DOE. The Project Baseline is an ICRC-documented reference for controlling any future project work and cost. The original Baseline was issued in March 1982; this summary document is available from National Technical Information Service (NTIS) as document number DOE/ORO/030540-T13. The Revised Baseline (dated April 1984) is available as document numbers DOE/OR/03054-T14 and T16. Supporting documentation, in the main concerned with research activities undertaken in support of the design, is also available from NTIS as DOE/OR/03054-T1 through T10 and DOE/OR/03054-1 through 125. The Baseline itself is made up of a documented design configuration, a documented estimate, in First Quarter Fiscal Year 1982 Dollars (1QFY82$), and a detailed schedule of the activities required to complete the project as of 3QFY82. The Baseline design is embodied in the 26 process design packages and other support documentation identified in the Baseline, as well as preliminary engineering flow diagrams prepared for all of the major process areas of the plant. All elements of the Project Baseline were developed within the constraints of the project criteria.

Not Available

1984-09-01T23:59:59.000Z

404

Summary of Demonstration Projects Using Coal Combustion Residuals as Engineered Structural Fill  

Science Conference Proceedings (OSTI)

This report summarizes six demonstration projects in which coal combustion residuals (CCRs) were used as engineered structural fill to construct embankments for highways, a bridge approach, and an airport runway extension. The CCRs studied included coal fly ash, bottom ash, and stabilized flue gas desulfurization (FGD) material. Significant aspects of the design, construction, and performance of these structural fills are described. CCRs are often cost-effective substitutes for natural soils in structura...

2010-11-09T23:59:59.000Z

405

The integrated melter off-gas treatment systems at the West Valley Demonstration Project  

SciTech Connect

The West Valley Demonstration project was established by an act of Congress in 1980 to solidify the high level radioactive liquid wastes produced from operation of the Western New York Nuclear Services Center from 1966 to 1972. The waste will be solidified as borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems.

Vance, R.F.

1991-12-01T23:59:59.000Z

406

CERAMIC MEMBRANE ENABLING TECHNOLOGY FOR IMPROVED IGCC EFFICIENCY  

SciTech Connect

This quarterly technical progress report will summarize work accomplished for Phase 1 Program during the quarter January to March 2002. In task 1 improvements to the membrane material have shown increased flux, and high temperature mechanical properties are being measured. In task 2, composite development has shown that alternative fabrication routes of the substrate can improve membrane performance under certain conditions. In task 3, scale-up issues associated with manufacturing large tubes have been identified and are being addressed. The work in task 4 has demonstrated that composite OTM elements can produce oxygen at greater than 95% purity for more than 1000 hours of the target flux under simulated IGCC operating conditions. In task 5 the multi-tube OTM reactor has been operated and produced oxygen.

Ravi Prasad

2002-05-01T23:59:59.000Z

407

Environmental assessment for the Waste Water Treatment Facility at the West Valley Demonstration Project and finding of no significant impact  

SciTech Connect

The possible environmental impacts from the construction and operation of a waste water treatment facility for the West Valley Demonstration Project are presented. The West Valley Project is a demonstration project on the solidification of high-level radioactive wastes. The need for the facility is the result of a rise in the work force needed for the project which rendered the existing sewage treatment plant incapable of meeting the nonradioactive waste water treatment needs.

1992-12-31T23:59:59.000Z

408

Methodological Approaches for Estimating the Benefits and Costs of Smart Grid Demonstration Projects  

Science Conference Proceedings (OSTI)

This report presents a comprehensive framework for estimating the benefits and costs of Smart Grid projects and a step-by-step approach for making these estimates. The framework identifies the basic categories of benefits, the beneficiaries of these benefits, and the Smart Grid functionalities that lead to different benefits and proposes ways to estimate these benefits, including their monetization. The report covers cost-effectiveness evaluation, uncertainty, and issues in estimating baseline conditions against which a project would be compared. The report also suggests metrics suitable for describing principal characteristics of a modern Smart Grid to which a project can contribute. This first section of the report presents background information on the motivation for the report and its purpose. Section 2 introduces the methodological framework, focusing on the definition of benefits and a sequential, logical process for estimating them. Beginning with the Smart Grid technologies and functions of a project, it maps these functions to the benefits they produce. Section 3 provides a hypothetical example to illustrate the approach. Section 4 describes each of the 10 steps in the approach. Section 5 covers issues related to estimating benefits of the Smart Grid. Section 6 summarizes the next steps. The methods developed in this study will help improve future estimates - both retrospective and prospective - of the benefits of Smart Grid investments. These benefits, including those to consumers, society in general, and utilities, can then be weighed against the investments. Such methods would be useful in total resource cost tests and in societal versions of such tests. As such, the report will be of interest not only to electric utilities, but also to a broad constituency of stakeholders. Significant aspects of the methodology were used by the U.S. Department of Energy (DOE) to develop its methods for estimating the benefits and costs of its renewable and distributed systems integration demonstration projects as well as its Smart Grid Investment Grant projects and demonstration projects funded under the American Recovery and Reinvestment Act (ARRA). The goal of this report, which was cofunded by the Electric Power Research Institute (EPRI) and DOE, is to present a comprehensive set of methods for estimating the benefits and costs of Smart Grid projects. By publishing this report, EPRI seeks to contribute to the development of methods that will establish the benefits associated with investments in Smart Grid technologies. EPRI does not endorse the contents of this report or make any representations as to the accuracy and appropriateness of its contents. The purpose of this report is to present a methodological framework that will provide a standardized approach for estimating the benefits and costs of Smart Grid demonstration projects. The framework also has broader application to larger projects, such as those funded under the ARRA. Moreover, with additional development, it will provide the means for extrapolating the results of pilots and trials to at-scale investments in Smart Grid technologies. The framework was developed by a panel whose members provided a broad range of expertise.

Lee, Russell [ORNL

2010-01-01T23:59:59.000Z

409

California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report  

Science Conference Proceedings (OSTI)

Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

2009-09-09T23:59:59.000Z

410

Impact of coal quality and gasifier technology on IGCC performance  

E-Print Network (OSTI)

1 Impact of coal quality and gasifier technology on IGCC performance Ola Maurstad1 *, Howard Herzog 02139, USA Abstract Integrated coal gasification combined cycle (IGCC) plants withpre different coals were used and alternatives with and without CO2 capture calculated. It was found

411

CoalFleet Advanced Combustion IGCC Permits Database  

Science Conference Proceedings (OSTI)

The CoalFleet Advanced Combustion IGCC Permits Database presents comprehensive information on permitting requirements and permit conditions for Integrated Gasification Combined Cycle (IGCC) power plants in an online database format. This Technical Update is a compilation of the Database contents as of March 31, 2008.

2008-04-11T23:59:59.000Z

412

Integrated Gasification Combined Cycle (IGCC) Design Considerations for High Availability  

Science Conference Proceedings (OSTI)

This report analyses public domain availability data from Integrated Gasification Combined Cycles (IGCC) and other significant coal gasification facilities, backed up with additional data gained from interviews and discussions with plant operators. Predictions for the availability of future IGCCs are made based on the experience of the existing fleet and anticipated improvements from the implementation of lessons learned.

2007-03-26T23:59:59.000Z

413

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

this project is to design and develop a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC and FutureGen type applications that meets DOE turbine performance...

414

2012 SG Peer Review - Recovery Act: Secure Interoperable Open Smart Grid Demonstration Project - Tom Magee, ConEd NY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Project Demonstration Project Patricia Robison Con Edison June 8, 2012 December 2008 Smart Grid Demonstration Project Objective Life-cycle Funding FY10 - FY13 $45.4 m Technical Scope (Insert graphic here) 2 *Integrate Legacy and Smart Grid information systems *Integrate external DR into distribution grid systems: - EV/Battery storage - Building Management Systems (BMS) - Standby generation - Photovoltaic Demonstrate secure interoperable services between utility distribution systems and customer owned distributed resources (DR) December 2008 Needs and Project Targets Integrate customer owned resources into distribution operations to enable customer participation and defer capital investment *Integrate DR resources into operator platform *Implement secure communications to DR resources

415

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: First Set of Composite Data Products for Publication - March 1, 2006  

DOE Green Energy (OSTI)

This presentation provides the initial composite data products available for publication from NREL's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.

2007-02-01T23:59:59.000Z

416

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2007 Composite Data Products; March 8, 2007  

DOE Green Energy (OSTI)

This presentation provides the composite data products from Spring 2007 from NREL's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Wipke, K.; Sprik, S.; Thomas, H.; Welch, C.

2007-04-01T23:59:59.000Z

417

Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development  

SciTech Connect

A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

1980-12-01T23:59:59.000Z

418

Renewable Energy Demonstration Project by the National Renewable Energy Laboratory and the General Services Administration  

DOE Green Energy (OSTI)

The Energy Policy Act of 1992 (EPACT) requires the General Services Administration (GSA) to implement a solar energy program to demonstrate and evaluate the performance of available technologies expected to have widespread commercial application. The GSA decided to carry out the project at the Denver Federal Center because of its proximity to the National Renewable Energy Laboratory (NREL). The location was thought to be of mutual benefit to NREL and the GSA: it provides NREL an opportunity to deploy technology and it provides the GSA an opportunity to gain a hands-on learning experience with renewables. The GSA plans to document their experience and use it as a case study in part of a larger training effort on renewable energy. This paper describes the technology selection process and provides an update on the status of the project.

Carlisle, N; Hoo, E; Westby, R [National Renewable Energy Lab., Golden, CO (United States); Hancock, E [Ed Hancock and Associates, Boulder, CO (United States); Lu, J [General Services Administration, Washington, DC (United States)

1994-11-01T23:59:59.000Z

419

ESS 2012 Peer Review - DOE-OE FY12 Electrical Energy Storage Demonstration Projects - Dan Borneo, SNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-OE FY12 Electrical DOE-OE FY12 Electrical Energy Storage Demonstration Projects The Renaissance Hotel Washington, D.C. September 2012 Presented by Dan Borneo SAND Document 5312608 SAND2012-7453 C Acknowledgements I would like to thank the DOE's Office of Electricity and Dr. Imre Gyuk, Program Manager of the Electrical Energy Storage Program, for their support and funding of the Energy Storage Demonstration Projects. 2 EES Emerging Technology Demonstrations Presentation Outline  Project Overview  Problem Statement  Approach  Current Status  Path Forward - Next Steps  Geographical Representation of Projects  Summary Chart of Projects  Brief Descriptions of Individual Projects  Concluding Remarks 3 EES Demonstrations Project Overview  Problem Statement

420

CE IGCC Repowering plant sulfuric acid plant. Topical report, June 1993  

SciTech Connect

A goal of the CE IGCC Repowering project is to demonstrate a hot gas clean-up system (HGCU), for the removal of sulfur from the product gas stream exiting the gasifier island. Combustion Engineering, Inc. (ABB CE) intends to use a HGCU developed by General Electric Environmental Services (GEESI). The original design of this system called for the installation of the HGCU, with a conventional cold gas clean-up system included as a full-load operational back-up. Each of these systems removes sulfur compounds and converts them into an acid off-gas. This report deals with the investigation of equipment to treat this off-gas, recovering these sulfur compounds as elemental sulfur, sulfuric acid or some other form. ABB CE contracted ABB Lummus Crest Inc. (ABB LCI) to perform an engineering evaluation to compare several such process options. This study concluded that the installation of a sulfuric acid plant represented the best option from both a technical and economic point of view. Based on this evaluation, ABB CE specified that a sulfuric acid plant be installed to remove sulfur from off-gas exiling the gas clean-up system. ABB LCI prepared a request for quotation (RFQ) for the construction of a sulfuric acid production plant. Monsanto Enviro-Chem Inc. presented the only proposal, and was eventually selected as the EPC contractor for this system.

Chester, A.M.

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "igcc demonstration project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson  

SciTech Connect

This study, sponsored by the U.S. General Services Administrations Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

2013-09-30T23:59:59.000Z

422

MHK Projects/Evopod E35 35kW grid connected demonstrator | Open Energy  

Open Energy Info (EERE)

E35 35kW grid connected demonstrator E35 35kW grid connected demonstrator < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.3028,"lon":-5.59772,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

423

MHK Projects/Minas Basin Bay of Fundy Commercial Scale Demonstration | Open  

Open Energy Info (EERE)

Minas Basin Bay of Fundy Commercial Scale Demonstration Minas Basin Bay of Fundy Commercial Scale Demonstration < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3658,"lon":-64.4294,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

424

MHK Projects/Evopod E1 1 10 scale grid connected demonstrator | Open Energy  

Open Energy Info (EERE)

Evopod E1 1 10 scale grid connected demonstrator Evopod E1 1 10 scale grid connected demonstrator < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":54.388,"lon":-5.566,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

425

MHK Projects/NJBPU 1 5 MW Demonstration Program | Open Energy Information  

Open Energy Info (EERE)

NJBPU 1 5 MW Demonstration Program NJBPU 1 5 MW Demonstration Program < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.6032,"lon":-74.3401,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

426

Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1982--September 30, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1982--September 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

1983-03-01T23:59:59.000Z

427

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2009-09-24T23:59:59.000Z

428

Heber geothermal binary demonstration project quarterly technical progress report, April 1, 1982--June 30, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1982-June 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

429

Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1981--September 30, 1981  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1981, through September 30, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the US Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

430

Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1982--December 31, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1982--December 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Dixon, J.R.; Hsiao, W.P.; Liparidis, G.S.; Lombard, G.L.; Nelson, T.T.; Van De Mark, G.D.

1983-05-01T23:59:59.000Z

431

Heber geothermal binary demonstration project quarterly technical progress report, January 1, 1982--March 31, 1982  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of January 1, 1982, through March 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

432

Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1981--December 31, 1981  

DOE Green Energy (OSTI)

The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1981, through December 31, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

1983-08-01T23:59:59.000Z

433

Over the energy edge: Results from a seven year new commercial buildings research and demonstration project  

SciTech Connect

Edge was a research oriented demonstration project that began in 1985. Twenty-eight commercial buildings were designed and constructed to use 30% less electricity than a hypothetical simulated baseline building. Average savings from the 18 buildings evaluated with post-occupancy, ``tuned`` simulation models were less, at 17%. The cost-effectiveness of the energy-efficiency measures at six of the 18 projects met the target cost-of-conserved (CCE) energy of 5.6cent/kWh for the total package of measures. The most important reason energy savings were not as great as predicted is that the actual, installed energy-efficiency measures and building characteristics changed from the design assumptions. The cost effectiveness of the measures would have been greater if the baseline was common practice rather than assumptions based on the regional building code. For example, the Energy Edge small offices use about 30% to 50% less energy than comparable new buildings. Savings also would have been greater if commissioning had been included within the program. Future projects should consider lower-cost ``hands-on`` evaluation techniques that provide direct feedback on measure performance based on functional and diagnostic testing, with annual check-ups to ensure persistence of savings.

Piette, M.A.; Nordman, B.; deBuen, O.; Diamond, R. [Lawrence Berkeley Lab., CA (United States); Codey, B. [Bonneville Power Administration, Portland, OR (United States)

1994-08-01T23:59:59.000Z

434

An evaluation of the Big Muddy Field low-tension flood demonstration project  

SciTech Connect

A commercial scale low-tension flood (micellar-polymer) demonstration project was conducted in the Second Wall Creek Reservoir in the Big Muddy Field in east central Wyoming. The cost-shared, low-tension flood used a 0.1 pore volume preflush and a 0.1 pore volume low-tension slug followed by a polymer drive bank. The sulfonate used in the low-tension slug was a blend of both low and high molecular weight synthetic sulfonates. Dow Pusher 500, a dry polyacrylamide polymer, was used in both the low-tension slug and polymer drive bank for mobility control. Although