  1. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  2. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  3. New Idaho Cleanup Project Contractor Unveils Management Team...

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contractor Unveils Management Team New Idaho Cleanup Project Contractor Unveils Management Team April 27, 2016 - 12:35pm Addthis IDAHO FALLS, Idaho - EM's new ...

  4. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  5. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  6. Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...

    Office of Environmental Management (EM)

    the Idaho Cleanup Project Sodium Bearing Waste Treatment Project May 2011 November 2012 ... the Idaho Cleanup Project Sodium Bearing Waste Treatment Project Table of Contents 1.0 ...

  7. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID – The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE’s Idaho site.

  8. Idaho Cleanup Project Congressional Nuclear Cleanup Caucus

    Office of Environmental Management (EM)

    Management * Idaho National Laboratory - managed by the Office of Nuclear Energy (Lead Program Secretarial Office) 3 www.energy.govEM EM-Idaho's Mission & Priorities * ...

  9. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Solicitations > ICP Contract Idaho Cleanup Project Contract Basic Contract Contract Modifications Documents Related to the ICP Contract Last Updated: 11/04/2015 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  10. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ICP-Core Contract Idaho Cleanup Project (ICP) Core Basic Contract Contract Modifications Other Documents Last Updated: 03/22/2016 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  11. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  12. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project- November 2012

    Broader source: Energy.gov [DOE]

    Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project

  13. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015. Today's contract

  14. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  15. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  16. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  17. IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact: Jon Hanian (208) 334-2100 For Immediate Release: June 27, 2013 IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY (IDAHO FALLS) - Governor C.L. "Butch" Otter joined U.S. Department of Energy officials today in announcing that a critically important cleanup project will be resuming at the Idaho National Laboratory. The project involves the "legacy" radioactive and hazardous waste generated during Cold War weapons production in the 1950s and 1960s that

  18. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  19. DOE extends the Idaho Cleanup Project Contract for Three Years | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract

  20. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  1. DOE Issues Final RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Final RFP for Idaho Cleanup Project Core March 13, 2015 - 2:00pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709, millerdc@id.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be complete in Idaho and remaining nuclear

  2. DOE Awards Contract for Idaho Clean-up Project (ICP) Core | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idaho Clean-up Project (ICP) Core DOE Awards Contract for Idaho Clean-up Project (ICP) Core February 4, 2016 - 6:15pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in

  3. Idaho Cleanup Project completes work at Test Area North complex at DOE�s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho site Idaho Cleanup Project completes work at Test Area North complex at DOE�s Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all the original contract work scope at the U.S. Department of Energy�s Idaho Site�s Test Area North (TAN) complex. The work involved close cooperation among the Department of Energy, the Environmental Protection Agency and the Idaho Department of Environmental Quality, with public input incorporated

  4. DOE Issues Draft RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Draft RFP for Idaho Cleanup Project Core December 22, 2014 - 2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement. The ICP Core procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition

  5. Idaho Cleanup Project Clearance Limits for Personal Property

    Broader source: Energy.gov [DOE]

    Idaho Cleanup Project Clearance Limits for Personal Property Kevin Konzen*, CH2M-WG Idaho, LLC ; Craig Nesshoefer, Idaho Cleanup Project Abstract: CH2M-WG Idaho, LLC (CWI) had sought alternative surface clearance limits for personal property from those referenced in DOE Order 458.1, which were approved September 2013 by the Department of Energy. Because much of the property would remain within DOE control, implementation was contingent upon receiving an exemption from 10 CFR 835, Surface Contamination Values (pending). CWI requested these changes due to inadequate instrument sensitivity of standard field instruments used across the nuclear industry for the clearance of several listed radionuclides. This included 241Pu, 125I, and 129I listed in the transuranic category; 90Sr, 126I, 131I and 133I listed in the thorium category; and several Hard-To-Detect (HTD) radionuclides listed in the beta-gamma emitter category. Instrument detection capabilities are now required to be justified by DOE Order 458.1, with personal property meeting the measurement objectives specified in MARSAME. MARSAME provides a consistent approach across the industry for determining the instrument MDC for comparison with the clearance limits of personal property. Challenges were discovered with the standard GM pancake probe for achieving the required sensitivity necessary for releasing property with radionuclides listed in the beta-gamma emitter category, and was determined incapable of surveying beta-gamma emitters with total surface clearance limits below this category using standard field scanning techniques. This affected 90Sr and iodine radionuclides listed in the thorium and transuranic categories. Likewise, the transuranic category included all radionuclides meeting the generic definition of a transuranic radionuclide, such as 241Pu. CWI proposed establishing an HTD category with higher clearance limits for all radionuclides with an average beta or electron emission up to 50 keV. CWI also

  6. Idaho Cleanup Project ships first Recovery Act-funded remote-handled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste out of Idaho THE IDAHO SITE NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 Joseph Campbell (CWI) 208-360-0142 For Immediate Release March 18, 2010 Idaho Cleanup Project ships first Recovery Act- funded remote-handled transuranic waste out of Idaho DATELINE - The Idaho Cleanup Project made its first shipment of remote-handled transuranic waste funded by the American Recovery and Reinvestment Act on March 11, 2010. This is the first of approximately 150 shipments

  7. Public comment sought on soil cleanup project at the Idaho Site�s Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area North Complex Public comment sought on soil cleanup project at the Idaho Site�s Test Area North Complex The U.S. Department of Energy (DOE) is seeking public comment on a small-scale soil cleanup at the Idaho Site�s Test Area North (TAN) complex. An Engineering Evaluation/Cost Analysis (EE/CA) document with three proposed alternatives for the soil cleanup is under evaluation by DOE, the U.S. Environmental Protection Agency, and Idaho�s Department of Environmental Quality.

  8. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect (OSTI)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  9. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect (OSTI)

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  10. Idaho Cleanup Core Project(ICP-Core) Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Core / Fluor Idaho, LLC Contract No. DE-EM0004083 Modifications You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > ICP-Core Contract > ICP-Core Basic Contract Blue Line Link to free copy of Acrobat Reader Some of the documents on this page are in the Adobe PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat Reader, you may download the Reader FREE by clicking on the icon on the left. Please note that URL

  11. Enterprise Assessments Review, Idaho Cleanup Project - September 2014 |

    Office of Environmental Management (EM)

    West Valley Demonstration Project Site Fire Protection Program March 2016 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  12. Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup

    Office of Environmental Management (EM)

    Project | Department of Energy Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project July 30, 2013 - 12:00pm Addthis Idaho Governor C.L. “Butch” Otter discusses the importance of completing the cleanup mission at the Idaho site. Idaho Governor C.L. "Butch" Otter discusses the importance of completing the cleanup mission at the Idaho site. An exterior view of the

  13. DOE, New Idaho Cleanup Contractor Reflect on Successful Transition, Look to Future

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – It’s now been a little more than a month since Fluor Idaho, LLC, officially took over as the new contractor for the Idaho Cleanup Project (ICP) at DOE’s Idaho Site.

  14. Idaho Cleanup Project CPP-603A basin deactivation waste management 2007

    SciTech Connect (OSTI)

    Croson, D.V.; Davis, R.H.; Cooper, W.B.

    2007-07-01

    The CPP-603A basin facility is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the U.S. Department of Energy's (DOE) Idaho National Laboratory (INL). CPP-603A operations are part of the Idaho Cleanup Project (ICP) that is managed by CH2M-WG Idaho, LLC (CWI). Once the inventoried fuel was removed from the basins, they were no longer needed for fuel storage. However, they were still filled with water to provide shielding from high activity debris and contamination, and had to either be maintained so the basins did not present a threat to public or worker health and safety, or be isolated from the environment. The CPP-603A basins contained an estimated 50,000 kg (110,200 lbs) of sludge. The sludge was composed of desert sand, dust, precipitated corrosion products, and metal particles from past cutting operations. The sediment also contained hazardous constituents and radioactive contamination, including cadmium, lead, and U-235. An Engineering Evaluation/Cost Analysis (EE/CA), conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), evaluated the risks associated with deactivation of the basins and the alternatives for addressing those risks. The recommended action identified in the Action Memorandum was to perform interim stabilization of the basins. The sludge in the basins was removed and treated in accordance with the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) and disposed at the INL Radioactive Waste Management Complex (RWMC). A Non-Time Critical Removal Action (NTCRA) was conducted under CERCLA to reduce or eliminate other hazards associated with maintaining the facility. The CERCLA NTCRA included removing a small high-activity debris object (SHADO 1); consolidating and mapping the location of debris objects containing Co-60; removing, treating, and disposing of the basin water; and filling the basins with grout/controlled low strength material (CLSM

  15. Idaho Site Workers Continue to Finish D&D Cleanup Projects Under Budget |

    Office of Environmental Management (EM)

    Demolition Project | Department of Energy D&D Crew Uses Specialized Tools to Cut Apart Massive Tank in Demolition Project Idaho Site D&D Crew Uses Specialized Tools to Cut Apart Massive Tank in Demolition Project November 25, 2015 - 12:05pm Addthis A worker employs a thermal lance to cut apart a massive tank so it can be removed from a building slated for demolition at the Idaho Site's Materials and Fuels Complex. A worker employs a thermal lance to cut apart a massive tank so it can

  16. DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced Mixed Waste Treatment Project: Contract will continue cleanup and waste operations at the Idaho Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    Idaho Falls – In order to further meet the U.S. Department of Energy’s commitments to the citizens of the state of Idaho, the DOE today announced that it has selected Idaho Treatment Group, LLC (ITG) to perform waste processing at the Advanced Mixed Waste Treatment Project (AMWTP) at DOE’s Idaho Site near Idaho Falls.

  17. MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho

    Office of Environmental Management (EM)

    MAJOR CONFORMED CONTRACTS LINKS SiteProject Contract Link Idaho Idaho Cleanup Project http:www.id.doe.govdoeidICPContractICPContract.htm Advance Mixed Waste Treatment http:...

  18. Stimulus Funding Will Accelerate Cleanup In Idaho

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CLEANUP PROJECT ARRA FACT SHEET 1119 Kb Energy Secretary Chu Announces 6 Billion in Recovery Act Funding for Environmental Cleanup 88 Kb Editorial Date March 31, 2008 By Bradley...

  19. Second site-wide five-year review of cleanup at DOE�s Idaho site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed; report now available online NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOE�s Idaho site completed; report now available online An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy�s (DOE) Idaho site. �This report verifies that the performance of cleanup actions at the Idaho Site continues

  20. Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 9 Billion Contract for Idaho Site Cleanup Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup March 23, 2005 - 11:07am Addthis WASHINGTON, D.C. - The United States Department of Energy today announced the selection of CH2M-WG Idaho, LLC as the contractor responsible for the Idaho Cleanup Project through the year 2012 at the Idaho National Laboratory (INL). "We are pleased to announce this selection to ensure a seamless transition and continued

  1. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  2. Retrieval System for Calcined Waste for the Idaho Cleanup Project - 12104

    SciTech Connect (OSTI)

    Eastman, Randy L.; Johnston, Beau A.; Lower, Danielle E.

    2012-07-01

    This paper describes the conceptual approach to retrieve radioactive calcine waste, hereafter called calcine, from stainless steel storage bins contained within concrete vaults. The retrieval system will allow evacuation of the granular solids (calcine) from the storage bins through the use of stationary vacuum nozzles. The nozzles will use air jets for calcine fluidization and will be able to rotate and direct the fluidization or displacement of the calcine within the bin. Each bin will have a single retrieval system installed prior to operation to prevent worker exposure to the high radiation fields. The addition of an articulated camera arm will allow for operations monitoring and will be equipped with contingency tools to aid in calcine removal. Possible challenges (calcine bridging and rat-holing) associated with calcine retrieval and transport, including potential solutions for bin pressurization, calcine fluidization and waste confinement, are also addressed. The Calcine Disposition Project has the responsibility to retrieve, treat, and package HLW calcine. The calcine retrieval system has been designed to incorporate the functions and technical characteristics as established by the retrieval system functional analysis. By adequately implementing the highest ranking technical characteristics into the design of the retrieval system, the system will be able to satisfy the functional requirements. The retrieval system conceptual design provides the means for removing bulk calcine from the bins of the CSSF vaults. Top-down vacuum retrieval coupled with an articulating camera arm will allow for a robust, contained process capable of evacuating bulk calcine from bins and transporting it to the processing facility. The system is designed to fluidize, vacuum, transport and direct the calcine from its current location to the CSSF roof-top transport lines. An articulating camera arm, deployed through an adjacent access riser, will work in conjunction with the

  3. DOE Idaho site reaches 20-year cleanup milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major

  4. Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC07-05ID14516 Modifications You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > ICP Contract > ICP Basic Contract Blue Line Link to free copy of Acrobat Reader Some of the documents on this page are in the Adobe PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat Reader, you may download the Reader FREE by clicking on the icon on the left. Please note that URL addresses in PDF documents will not

  5. Idaho Site Advances Recovery Act Cleanup after Inventing Effective...

    Office of Environmental Management (EM)

    workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a de- commissioned nuclear reactor using an innovative treatment process. ...

  6. Second Site-Wide Five-Year Review of Cleanup at DOE’s Idaho Site Completed; Report Now Available Online

    Broader source: Energy.gov [DOE]

    An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy’s (DOE) Idaho site.

  7. Processing Plan for Potentially Reactive/Ignitable Remote Handled Transuranic Waste at the Idaho Cleanup Project - 12090

    SciTech Connect (OSTI)

    Troescher, Patrick D.; Hobbes, Tammy L.; Anderson, Scott A.

    2012-07-01

    Remote Handle Transuranic (RH-TRU) Waste generated at Argonne National Laboratory - East, from the examination of irradiated and un-irradiated fuel pins and other reactor materials requires a detailed processing plan to ensure reactive/ignitable material is absent to meet WIPP Waste Acceptance Criteria prior to shipping and disposal. The Idaho Cleanup Project (ICP) approach to repackaging Lot 2 waste and how we ensure prohibited materials are not present in waste intended for disposal at Waste Isolation Pilot Plant 'WIPP' uses an Argon Repackaging Station (ARS), which provides an inert gas blanket. Opening of the Lot 2 containers under an argon gas blanket is proposed to be completed in the ARS. The ARS is an interim transition repackaging station that provides a mitigation technique to reduce the chances of a reoccurrence of a thermal event prior to rendering the waste 'Safe'. The consequences, should another thermal event be encountered, (which is likely) is to package the waste, apply the reactive and or ignitable codes to the container, and store until the future treatment permit and process are available. This is the same disposition that the two earlier containers in the 'Thermal Events' were assigned. By performing the initial handling under an inert gas blanket, the waste can sorted and segregate the fines and add the Met-L-X to minimize risk before it is exposed to air. The 1-gal cans that are inside the ANL-E canister will be removed and each can is moved to the ARS for repackaging. In the ARS, the 1-gal can is opened in the inerted environment. The contained waste is sorted, weighed, and visually examined for non compliant items such as unvented aerosol cans and liquids. The contents of the paint cans are transferred into a sieve and manipulated to allow the fines, if any, to be separated into the tray below. The fines are weighed and then blended with a minimum 5:1 mix of Met-L-X. Other debris materials found are segregated from the cans into containers

  8. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment

    Broader source: Energy.gov [DOE]

    For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment...

  9. Idaho Site Closes Out Decontamination and Decommissioning Project about $440 Million under Cost

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho Cleanup Project (ICP) successfully closed out a $796 million nuclear facility decontamination and decommissioning project. The work was completed about $440 million under cost.

  10. Idaho Cleanup Contractor Surpasses Significant Safety Milestones

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury.

  11. An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

    SciTech Connect (OSTI)

    Nenni, Joseph A.; Thompson, Theron J.

    2012-07-01

    The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability

  12. Legacy Cleanup Completion Project

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Christine Gelles, Associate Deputy Assistant Secretary, Waste Management EM HQ.

  13. Idaho Site Cleanup Employees Look Forward to Handling Robotic Arms

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Shirley Perez may be the most excited person ready to get her hands on new robotic arms when they are installed in the EM Idaho Site’s Advanced Mixed Waste Treatment Project (AMWTP) boxlines this fall.

  14. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  15. Third Buried Waste Retrieval Project under way at DOE Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Third Buried Waste Retrieval Project under way at DOE Idaho Site The Idaho Cleanup Project has recently begun removing Cold War weapons waste from a third retrieval area at the ...

  16. Idaho Site Contractor Achieves Treatment Project Milestone

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho site’s main cleanup contractor recently achieved a major performance milestone by successfully passing an operational readiness review for a first-of-a-kind facility that will treat the remaining 900,000 gallons of liquid radioactive waste generated by the site’s legacy cleanup mission.

  17. West Valley Demonstration Project Site Cleanup By the Numbers...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Site Cleanup By the Numbers West Valley Demonstration Project Site Cleanup By the Numbers West Valley Demonstration Project Site Cleanup By the ...

  18. Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – An innovative idea for cleaning up sodium in a decommissioned nuclear reactor at EM’s Idaho site grew from a carpool discussion.

  19. Idaho Site’s Cold War Cleanup Takes Center Stage in Publication

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho – An association with more than 29,000 members featured an in-depth article on EM’s extensive Cold War legacy cleanup at the Idaho site in the current issue of its publication, The Military Engineer.

  20. EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM and its main cleanup contractor at DOE’s Idaho Site recently reached a major project milestone necessary to maintain water quality and continued, safe operations within the site’s spent nuclear fuel storage basin.

  1. Expedited Cleanup Process at Idaho Site Leads to Taxpayer Savings

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – A streamlined process to remediate contaminated areas at DOE’s 890-square-mile Idaho Site has benefitted the Environmental Restoration (ER) Program and taxpayers in general.

  2. Stimulus Funding Creating Cleanup Jobs At DOE?s Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stimulus Funding Creating Cleanup Jobs At DOEs Idaho Site Arimo resident Jeff Johnson did something this week he hasnt done since January. He reported to his new job. Funding...

  3. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Office of Environmental Management (EM)

    October 6, 2011 Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago IDAHO FALLS, Idaho - From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first

  4. A Decade of Cleanup Progress at EM's Idaho Site | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho ...

  5. Protocol_for_Environmental_Management_Cleanup_Projects_(clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf PDF icon ProtocolforEnvironmentalManagement...

  6. Legacy Clean-up Completion Project Overview | Department of Energy

    Office of Environmental Management (EM)

    Legacy Clean-up Completion Project Overview Legacy Clean-up Completion Project Overview Topic: Bob Pfaff provided the members with information regarding the status of the Fiscal ...

  7. CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP ...

  8. Idaho Site Completes Cleanup Milestone Ahead of Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Operations » Idaho Operations Office Idaho Operations Office Idaho Operations Office INL combines the expertise of government, industry and academia in a single laboratory under the leadership of Battelle Energy Alliance (BEA), a team comprised of Battelle Memorial Institute, Washington Group International, BWXT Services, Inc., the Electric Power Research Institute and Massachusetts Institute of Technology. BEA manages the laboratory under a Management and Operating contract. This

  9. Mission Need Statement: Idaho Spent Fuel Facility Project

    SciTech Connect (OSTI)

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  10. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. FY15 Budget Overview for Cleanup Caucus (1.78 MB) Idaho Cleanup Project (1.36 MB) Advanced Mixed Waste Treatment Project (2.3 MB) Richland Operations Office Cleanup Strategy, Scope (8.93 MB) Idaho Cleanup

  11. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Recovery Act cleanup Lab completes first Recovery Act cleanup project The $13 million project involved demolition of an 18,000-square-foot former nuclear fusion research facility. August 4, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits

  12. WIPP - Idaho Impacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP - Idaho Impacts WIPP - Idaho Impacts Presentation from the 2015 DOE National Cleanup Workshop by Jack Zimmerman, Deputy Manager for the Idaho Cleanup Project, DOE Idaho Operations Office. WIPP - Idaho Impacts (543.4 KB) More Documents & Publications EIS-0200-SA-03: Supplement Analysis EIS-0026-S2: Final Supplemental Environmental Impact Statement EIS-0026-SA-06: Supplement Analysis

  13. EM Cleanup Crew Nears Finish at Idaho Transuranic Waste Storage Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Working deliberately under demanding conditions, workers have entered the final storage “cell” to remove drums and boxes of waste from the Transuranic Storage Area–Retrieval Enclosure (TSA-RE) at the Department’s Advanced Mixed Waste Treatment Project (AMWTP) in Idaho.

  14. DOE-Idaho Operations Summary For July 7 to July 20, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Idaho Cleanup Project July 6: During a facility walk-down at the Accelerated ...

  15. DOE-Idaho Operations Summary For March 8 to March 22, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). ... abatement and strip out of the basement labs and the denitrator room are ...

  16. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

    Tim Jackson (208) 526-8484 For Immediate Release May 29, 2014 Public invited to comment on Draft Environmental Assessment on the Disposition of Five Signature Properties at Idaho National Laboratory The

  17. Idaho_National_Laboratory

    Office of Environmental Management (EM)

    Stacey Francis Small Business Program Manager Idaho National Laboratory 2 Idaho National Laboratory Prime Contractors * Idaho National Laboratory - Managed and Operated by Battelle Energy Alliance, LLC - Office of Nuclear Energy * Idaho Cleanup Project - Managed by Fluor Idaho, LLC - Office of Environmental Management * Naval Reactor Facility - Managed by Bechtel Marine Propulsion Corporation - Naval Nuclear Propulsion Program Department of Energy - Idaho 3 We Maintain: * 890 square miles * 111

  18. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    »¿ About DOE Button Staff & Contractors Button News Button Contact Us Button Search Go Button Link: energy.gov Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button Welcome Inside ID Laboratory Programs Energy Employees' Compensation Program Public Involvement Opportunities Press Box Contracts, Solicitations & Financial Assistance FOIA (DOE-ID Freedom of Information

  19. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

  20. DOE-Idaho Operations Summary For July 21 to Aug. 3, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project Aug. 3: While responding to a power outage at the Idaho Nuclear Technology and Engineering Center, an electrician received an electrical shock while removing ...

  1. Manhattan Project Truck Unearthed in Recovery Act Cleanup | Department...

    Broader source: Energy.gov (indexed) [DOE]

    A Los Alamos National Laboratory (LANL) excavation crew working on an American Recovery and Reinvestment Act cleanup project has uncovered the remnants of a 1940s military truck ...

  2. WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE...

    Office of Environmental Management (EM)

    WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE April 1, 2010 - 12:00pm Addthis An operator uses ...

  3. Independent Analysis of Alternatives for Disposition of the Idaho Calcined High-Level Waste Inventory Volume 1- Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy Idaho Field Office and the Office of Environmental Management (EM) chartered an independent Analysis of Alternatives for the Idaho Calcine Disposition Project (CDP), part of the overall Idaho Cleanup Project.

  4. Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Meeting in Vienna | Department of Energy Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna October 22, 2012 - 12:00pm Addthis Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler presents at the Uranium

  5. Tritium research laboratory cleanup and transition project final report

    SciTech Connect (OSTI)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  6. Wendy Cain named portfolio federal project director for ETTP cleanup

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Oak Ridge Office of Environmental Management has named Wendy Cain as its new portfolio federal project director for cleanup of the East Tennessee Technology Park.

  7. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  8. Manhattan Project truck unearthed at landfill cleanup site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan project truck Manhattan Project truck unearthed at landfill cleanup site A LANL excavation crew working on a Recovery Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. April 8, 2011 image description Excavator operator Kevin Miller looks at the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. Contact Fred deSousa Communications Office (505) 665-3430 Email Remnants of a 1940s military truck

  9. EM Highlights Idaho Site's 2014 Accomplishments

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program at the Idaho site and its cleanup contractors ended 2014 with many accomplishments.

  10. Department of Energy Idaho - Advanced Mixed Waste Treatment Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    > AMWTP Contract Idaho Treatment Group, LLC (ITG) Advanced Mixed Waste Treatment Project Contract Basic Contract Contract Modifications Last Updated: 10052015 Privacy Statement...

  11. DOE-Idaho Operations Summary For September 12 to September 26...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). ... notified and a critique of the incident was scheduled. (NE-ID-BEA-INL-LABS-2011-0005). ...

  12. DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone

    Broader source: Energy.gov [DOE]

    In a project sponsored by the U.S. Department of Energy (DOE), a demonstration-scale application of RTI International’s warm synthesis gas (syngas) cleanup process technology has achieved a key operational milestone at Tampa Electric Company’s coal gasification plant in Polk County, Fla.

  13. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Institute | Department of Energy Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE

  14. DOE Names New Director of Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Names New Director of Idaho Operations Office Idaho Falls, ID - The Department of Energy today announced that Rick Provencher has been named manager of its Rick Provencher Idaho Operations Office, which oversees the nation's leading commercial nuclear energy research laboratory and environmental cleanup and waste management mission at the site. Provencher, who has managed the highly-successful Idaho Cleanup Project since 2004, will assume his new duties on May 23, 2010. He succeeds interim

  15. Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy IDAHO FALLS, Idaho - Workers at the Idaho site have enlisted microbes to help remediate previously contaminated groundwater and advance the protection of the Snake River Plain Aquifer. The microbes in the aquifer are fed a mixture of sodium lactate and whey powder, a common ingredient found in sport protein drinks. "The microbes eat it, and in the process break down trichloroethylene (TCE). Although TCE is a carcinogen, the end products are harmless," said Lorie Cahn,

  16. Independent Oversight Activity Report, Idaho Cleanup Project – November 2013

    Broader source: Energy.gov [DOE]

    Pre-Restart Visit to the Integrated Waste Treatment Unit by the Defense Nuclear Facilities Safety Board [HIAR-ICP-2013-11-19

  17. DOE extends the Idaho Cleanup Project contract for three years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE eGuide DOE eGuide April 17, 2014 - 10:45am Addthis What is the DOE eGuide? The DOE eGuide is a toolkit designed to help organizations implement an energy management system through an organized step by step process at three different levels: Foundational, ISO50001 and Superior Energy Performance. It includes forms, checklists, templates, examples, and guidance to assist the Energy Team throughout the implementation process. The five major steps of the eGuide start with the decision to utilize

  18. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War

  19. Agencies sign last record of decision for DOE Idaho cleanup program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    but the agencies concluded that two sites require cleanup because of concentrations of lead, arsenic or mercury in the soil. Also in the ROD, the agencies agreed to implement a...

  20. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Broader source: Energy.gov [DOE]

    From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National...

  1. Idaho Petroleum Reduction Leadership Project | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt041_es_baird_2011_p.pdf (699.2 KB) More Documents & Publications Idaho Petroleum Reduction Leadership Project Idaho Petroleum Reduction Leadership Project North Central Texas Council of Governments’ North Central Texas Alternative Fuel and Advanced Technology Investments initiative is one of 25 Area of Interest 4 Selections

  2. Employees Achieve Certified Success at Idaho Site’s Waste Treatment Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho – Employees at EM’s Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho Site have finished preparing 7,231 certified waste drums so they’re at the ready to be shipped for disposal.

  3. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty...

    National Nuclear Security Administration (NNSA)

    Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  4. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project...

    National Nuclear Security Administration (NNSA)

    Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  5. Best-in-Class Project Management Initiative Corporate Implementation...

    Broader source: Energy.gov (indexed) [DOE]

    ... Consolidated Business Center ETEC Energy Technology Engineering Center GJO Grand Junction Project Office ICP Idaho Cleanup Project LASO Los Alamos Site Office NSO Nevada ...

  6. Idaho National Laboratory (INL) Seismic Risk Assessment Project:

    Office of Environmental Management (EM)

    Implementation of Proposed Methodology at INL and Associated Risk Studies | Department of Energy Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Idaho National Laboratory (INL) Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. INL Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and

  7. CRAD, Fire Protection- Idaho Accelerated Retrieval Project Phase II

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Fire Protection program at the Idaho Accelerated Retrieval Project Phase II.

  8. CRAD, Engineering- Idaho Accelerated Retrieval Project Phase II

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Engineering program at the Idaho Accelerated Retrieval Project Phase II.

  9. CRAD, Criticality Safety- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Criticality Safety program at the Idaho Accelerated Retrieval Project Phase II.

  10. CRAD, Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Management at the Idaho Accelerated Retrieval Project Phase II.

  11. CRAD, Occupational Safety & Health- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Occupational Safety and Industrial Hygiene Program at the Idaho Accelerated Retrieval Project Phase II.

  12. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  13. CRAD, Safety Basis- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Safety Basis at the Idaho Accelerated Retrieval Project Phase II.

  14. CRAD, Quality Assurance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho Accelerated Retrieval Project Phase II.

  15. CRAD, Emergency Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho Accelerated Retrieval Project Phase II.

  16. CRAD, Training- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Training Program at the Idaho Accelerated Retrieval Project Phase II.

  17. CRAD, Conduct of Operations- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February, 2006 Commencement of Operations assessment of the Conduct of Operations program at the Idaho Accelerated Retrieval Project Phase II.

  18. CRAD, Radiological Controls- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Radiation Protection Program at the Idaho Accelerated Retrieval Project Phase II.

  19. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War Open full screen to view more You are...

  20. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's ... The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global ...

  1. EIS-0136: Special Isotope Separation Project Idaho National Engineering Laboratory, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to provide environmental input to the decision to construct the Special Isotope Separation Project, which would allow for the processing of existing fuel-grade plutonium into weapons-grade plutonium using the Atomic Laser Isotope Separation process.

  2. Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Administration | (NNSA) Project at Y-12 Meets Another Milestone July 29, 2010 Microsoft Office document icon R-7-28

    Recovery Act Recipient Data Recovery Act Recipient Data A listing of all Recovery Act recipients and their allocations. Updated weekly. recoveryactfunding.xls (947 KB) More Documents & Publications Recovery Act Awardees June 25, 2010 Reovery Act Awardees July 22, 2011 Record of Categorical Exclusion (CS) Determination, Office of Electricity Delivery and Energy

  3. Los Alamos Legacy Clean-up Completion Project Bridge Contract

    Broader source: Energy.gov [DOE]

    At the December 10, 2014 Special meeting Jack Craig DOE HQ, Provided Information on the Bridge Contract for the Shift from NNSA Oversight to EM Oversight for LANL Environmental Clean-up.

  4. Deactivation Project Commences While Cleanup Continues at Paducah...

    Energy Savers [EERE]

    ... Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods A 150-foot-tall crane turns an eight-foot-diameter auger performing deep-soil mixing at the Paducah ...

  5. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era

    National Nuclear Security Administration (NNSA)

    Building | National Nuclear Security Administration | (NNSA) Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building March 17, 2011 Microsoft Office document icon NR-03-17

  6. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling April 27, 2010 Microsoft Office document icon R-10-21

  7. Idaho Waste Vitrification Facilities Project Vitrified Waste Interim Storage Facility

    SciTech Connect (OSTI)

    Bonnema, Bruce Edward

    2001-09-01

    This feasibility study report presents a draft design of the Vitrified Waste Interim Storage Facility (VWISF), which is one of three subprojects of the Idaho Waste Vitrification Facilities (IWVF) project. The primary goal of the IWVF project is to design and construct a treatment process system that will vitrify the sodium-bearing waste (SBW) to a final waste form. The project will consist of three subprojects that include the Waste Collection Tanks Facility, the Waste Vitrification Facility (WVF), and the VWISF. The Waste Collection Tanks Facility will provide for waste collection, feed mixing, and surge storage for SBW and newly generated liquid waste from ongoing operations at the Idaho Nuclear Technology and Engineering Center. The WVF will contain the vitrification process that will mix the waste with glass-forming chemicals or frit and turn the waste into glass. The VWISF will provide a shielded storage facility for the glass until the waste can be disposed at either the Waste Isolation Pilot Plant as mixed transuranic waste or at the future national geological repository as high-level waste glass, pending the outcome of a Waste Incidental to Reprocessing determination, which is currently in progress. A secondary goal is to provide a facility that can be easily modified later to accommodate storage of the vitrified high-level waste calcine. The objective of this study was to determine the feasibility of the VWISF, which would be constructed in compliance with applicable federal, state, and local laws. This project supports the Department of Energys Environmental Management missions of safely storing and treating radioactive wastes as well as meeting Federal Facility Compliance commitments made to the State of Idaho.

  8. New Generation Dresden NPP Demineralizer Vault Cleanup Project

    SciTech Connect (OSTI)

    Denton, M.S.; CET, Ph.D.; Forrester, K.; Azar, M.

    2008-07-01

    also show that the actual volumetric fraction of solids produced are relatively small. In order to estimate the amount of material (Al or Fe depending on the electrode material) added by the EC process, a rough rule of thumb has been found to be {approx}15 ppm per amp-minute. It was found with most wastewaters that Cs seeding (if that step is required) added {approx} 100 ppm Cs Seed and 10-15 ppm/amp minute additional floc from the electrodes. In a typical BWR wastewater case, where the TSS represented {<=} 0.15 wt% ({approx}1500 ppm). At 1.5 amp-min., the Al (III) added by the EC process would be {approx} 20 ppm, or {approx} 60 ppm as Al(OH){sub 3}. It was found the relatively low floc [{approx} 40 ppm as dried Al(OH){sub 3}] worked quite well for the high colloid level present ({approx}1500 ppm), and would be even more enhanced with the use of recycle. Even at that relatively low treatment dose, the colloidal TSS in the wastewater was effectively flocculated to yield agglomerates that were easily filtered and dewatered. Another rule of thumb is that, empirically, TDS (in mg/l) is typically {approx}0.5 X conductivity (in umho/cm). For instance, a conductivity reading of 100 umho/cm corresponds to about 50 ppm of TDS. As can be seen, the amount of material actually added in this vault cleanup of {approx}15 ppm per amp-min compared to the existing {approx}1500 ppm of TDS present (0.5 X conductivity of 3000 {mu}mho/cm) is minimal. In this vault cleanup, as a precautionary measure, the HIC was a specially designed Press-Pak with internal sheet filters, final dewatering leg, and a expandable, outer bladder if needed for final dewatering. It was found after filling the first HIC, of two, that the material dewatered and passed final dewatering tests without the need for the precautionary Press-Pak feature. Original estimates by the evaluation team estimated it would take some 11 to 12 HICs to remove the vault contents to a remote location for treatment, dewatering and final

  9. DOE-Idaho Operations Summary For March 8 to April 11, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project March 15: A crane operator at the Integrated Waste Treatment ... was not damaged, but there was minor damage to the conduit on the side of the crane block. ...

  10. Idaho National Laboratory receives national recognition for Small Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentoring Program Media contacts: Erik Simpson (208) 360-0426 Idaho National Laboratory receives national recognition for Small Business Mentoring Program With the help of American Recovery and Reinvestment Act funds, the Idaho Cleanup Project continues work to protect the Snake River Plain Aquifer this week by injecting grout into 21 buried waste locations in the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Department of Energy�s Idaho Site. The

  11. Small Business Program Extends Hand to Vendors, Entrepreneurs Throughout Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Idaho National Laboratory reached out to small business owners throughout the state recently by meeting individually and in groups to explain the national laboratory’s needs for achieving its research missions. Nearly 50 people participated in the lab’s Small Business Forum Nov. 13 at INL’s new gateway research center, the Energy Innovation Laboratory. The forum was hosted by the Department of Energy-Idaho Operations Office, Idaho National Laboratory, Idaho Cleanup Project and the Idaho Treatment Group.

  12. Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)

    Broader source: Energy.gov [DOE]

    Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)

  13. EA-1050: Test Area North Pool Stabilization Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Idaho National Engineering Laboratory's proposal to remove 344 canisters of Three Mile Island core debris and...

  14. DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a contract to Enviro Compliance Solutions Inc. of Tustin, California to perform environmental sampling, monitoring services and analysis of ongoing cleanup activities being performed at the West Valley Demonstration Project in western New York.

  15. Manhattan Project Truck Unearthed in Recovery Act Cleanup

    Office of Environmental Management (EM)

    April 20, 2011 Remnants of 1940s military truck buried in a Manhattan Project-era landfill ... uncovered the remnants of a 1940s military truck buried in a Manhattan Project landfill. ...

  16. Idaho Completion Projects Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect (OSTI)

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  17. Wildlife Impact Assessment Palisades Project, Idaho, Final Report.

    SciTech Connect (OSTI)

    Sather-Blair, Signe

    1985-02-01

    The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

  18. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  19. Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project

    Broader source: Energy.gov [DOE]

    BERKELEY, Calif. – Lawrence Berkeley National Laboratory authorized this month a small business joint venture to begin a deactivation and demolition project in an area here known as Old Town.

  20. DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mixed Waste Treatment Project Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Friday, May 27, 2011 DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced Mixed Waste Treatment Project Contract will continue cleanup and waste operations at the Idaho Site Idaho Falls � In order to further meet the U.S. Department of Energy�s commitments to the citizens of the state of Idaho, the DOE today announced that it has selected Idaho Treatment Group, LLC (ITG)

  1. Idaho Site Closes Out Decontamination and Decommissioning Project...

    Office of Environmental Management (EM)

    Workers demolish the Test Area North Hot Shop Complex, shown here. Crews demolish CPP-601, a building used during used nuclear fuel reprocessing at the Idaho Nuclear Technology and ...

  2. Department of Energy Idaho - Contracts, Financial Assistance &

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solicitations Contracts, Financial Assistance & Solicitations Contracts, Financial Assistance & Solicitations Procurement and Acquisition, Doing Business With the U.S. Department of Energy Financial Assistance Forms and Information For Applicants and Recipients DOE Site Facility Management Contracts Internet Posting ACQUISITION Selected Contracts of Public Interest ICP Core Contract - Fluor Idaho, LLC Advanced Mixed Waste Treatment Project (AMWTP) Contract Idaho Cleanup Project (ICP)

  3. Finding of no significant impact for the interim action for cleanup of Pit 9 at the Radioactive Waste Management Complex, Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0854, for an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The proposed action would be conducted at Pit 9, Operable Unit 7--10, located at the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The proposed action consists of construction of retrieval and processing buildings, excavation and retrieval of wastes from Pit 9, selective physical separation and chemical extraction, and stabilization of wastes either through thermal processing or by forming a stabilized concentrate. The proposed action would involve limited waste treatment process testing and full-scale waste treatment processing for cleaning up pre-1970 Transuranic (TRU) wastes in Pit 9. The purpose of this interim action is to expedite the overall cleanup at the RWMC and to reduce the risks associated with potential migration of Pit 9 wastes to the Snake River Plain Aquifer.

  4. DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy M-Washington Group Idaho for Price-Anderson Violations DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations June 14, 2007 - 1:40pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today notified CH2M-Washington Group Idaho (CWI) that it will fine the company $55,000 for violations of the Department's nuclear safety requirements. CWI is the prime contractor responsible for managing the Idaho Cleanup Project at the Idaho National Laboratory site.

  5. DOE names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as a VPP Star Site names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project as a VPP Star Site Rick Provencher of DOE-ID, Jeff Mousseau of BBWI and co-safety chairs Tracy Anderson and Josh Wallace raise the VPP flag indicating the Advanced Mixed Waste Treatment Project is a Star site. View larger image here. The U.S. Department of Energy today announced it has recognized Bechtel BWXT Idaho at the Advanced Mixed Waste Treatment Project as a Star site in its Voluntary Protection

  6. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  7. Sound Project Management, Safe and Efficient Work Lead to Savings for More

    Office of Environmental Management (EM)

    Recovery Act Cleanup | Department of Energy Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup Sound management practices and safe, efficient work have led to cost savings and rapid progress in the Idaho site's American Recovery and Reinvestment Act projects. The efficiencies have freed up $12 million for additional Cold War cleanup. That $12 million

  8. Idaho - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  9. Idaho - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  10. Idaho - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  11. Electrical Safety Investment Safeguards Employees at Large Idaho Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho Site’s main cleanup contractor is using a $1.8 million DOE investment to safeguard employees from the threat of second- and third-degree electrical arc flash burns.

  12. 2013 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 11/12/13 Public invited to comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials 10/25/13 Bill Gates visit to Idaho validates innovation role for national laboratories 10/17/13 Next-generation nuclear fuel withstands high-temperature accident conditions 07/11/13 Process Improvements at AMWTP Will Lead to Safer, Less Expensive Processing of Radioactive Waste at DOE's Idaho Site 06/27/13 Important Cleanup Project To Resume At Idaho

  13. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    SciTech Connect (OSTI)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  14. An innovative approach to multimedia waste reduction: Measuring performance for environmental cleanup projects

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.; George, S.M.

    1993-04-01

    One of the greatest challenges we now face in environmental cleanup is measuring the progress of minimizing multimedia transfer releases and achieving waste reduction. Briefly, multimedia transfer refers to the air, land, and water where pollution is not controlled, concentrated, and moved from one medium to another. An example of multimedia transfer would be heavy metals in wastewater sludges moved from water to land disposal. Over $2 billion has been budgeted for environmental restoration site cleanups by the Department of Energy (DOE) for FY 1994. Unless we reduce the huge waste volumes projected to be generated in the near future, then we will devote more and more resources to the management and disposal of these wastes. To meet this challenge, the Martin Marietta Energy Systems, Inc., Oak Ridge Environmental Restoration (ER) Program has explored the value of a multimedia approach by designing an innovative Pollution Prevention Life-Cycle Model. The model consists of several fundamental elements (Fig. 1) and addresses the two major objectives of data gathering and establishing performance measures. Because the majority of projects are in the remedial investigation phase, the focus is on the prevention of unnecessary generation of investigation-derived waste and multimedia transfers at the source. A state-of-the-art tool developed to support the life-cycle model for meeting these objectives is the Numerical Scoring System (NSS), which is a computerized, user-friendly data base system for information management, designed to measure the effectiveness of pollution prevention activities in each phase of the ER Program. This report contains a discussion of the development of the Pollution Prevention Life-Cycle Model and the role the NSS will play in the pollution prevention programs in the remedial investigation phase of the ER Program at facilities managed by Energy Systems for DOE.

  15. Idaho National Laboratory (INL) Seismic Risk Assessment Project...

    Office of Environmental Management (EM)

    Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. ...

  16. DOE Announces Start of Recovery Act Funded Cleanup Projects at Y-12

    Broader source: Energy.gov [DOE]

    DOE announces that cleanup of the Old Salvage Yard at the Y-12 National Security Complex has started using funding received from the Recovery Act.

  17. Coeur dAlene Tribe Energy Efficiency and Conservation Block Grant Project, Plummer, Idaho

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stacey J. Fox, Environmental Planner, Coeur d'Alene Tribe Natural Resource Department, Environmental Programs Office, Plummer, Idaho Presentation Outline - Coeur d'Alene Tribe Background - History of the Tribal Natural Resource Department - Energy Work Prior to the EECBG - EECBG Project Objectives - Progress-to-Date - Lessons Learned - Examples of EECBG Energy Audit Report Findings - New Energy Efficiency Feasibility Study Objectives - Contact Information Coeur d'Alene Tribe Background - The

  18. DOE Selects Contractor for California Energy Technology Engineering Center Cleanup

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a competitive $25.7 million task order for cleanup activities at the Energy Technology Engineering Center (ETEC) to North Wind of Idaho Falls, Idaho.

  19. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect (OSTI)

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  20. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect (OSTI)

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  1. Department of Energy Idaho - Links

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ICP Idaho Completion Project INL Idaho National Laboratory Citizen's Advisory Board (CAB) Higher Education - INRA State & Local National Environmental Policy Act (NEPA) Office...

  2. Public comment sought on hot cell removal project at the Idaho...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at the Idaho Sites Advanced Test Reactor Complex The U.S. Department of Energy ... building that contains them at the Idaho Sites Advanced Test Reactor complex. ...

  3. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  4. Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site. Revision 3, Final report

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ``as low as reasonably achievable`` (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m{sup 2}) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report.

  5. Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Video Clips DOE-ID Press Releases and Video Clips Press Releases January - Current 2015 10/21/2015 DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed Facilities 09/29/15 DOE extends Advanced Mixed Waste Treatment Project contract 09/29/15 DOE extends Idaho Cleanup Project contract 06/08/15 Public invited to comment on Draft Supplement Analysis on Two Proposed Shipments of Commercial Nuclear Fuel to Idaho National Laboratory for Research and Development Purposes 03/16/15

  6. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    SciTech Connect (OSTI)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

  7. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    SciTech Connect (OSTI)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  8. Idaho Nuclear Technology and Engineering Center Newly Generated Liquid Waste Demonstration Project Feasibility Study

    SciTech Connect (OSTI)

    Herbst, A.K.

    2000-02-01

    A research, development, and demonstration project for the grouting of newly generated liquid waste (NGLW) at the Idaho Nuclear Technology and Engineering Center is considered feasible. NGLW is expected from process equipment waste, decontamination waste, analytical laboratory waste, fuel storage basin waste water, and high-level liquid waste evaporator condensate. The potential grouted waste would be classed as mixed low-level waste, stabilized and immobilized to meet RCRA LDR disposal in a grouting process in the CPP-604 facility, and then transported to the state.

  9. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. To date, EM has made substantial progress in nearly every area of nuclear waste cleanup and completed cleanup at 91 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive

  10. Transition of the U.S. Department of Energy Fernald Closure Project (FCP) from Cleanup to Legacy Management

    SciTech Connect (OSTI)

    Powell, J.; Craig, J.R.; Jacobson, C.

    2006-07-01

    The Fernald Closure Project encompasses a 1,050-acre tract of land northwest of Cincinnati, Ohio. Dedicated to the production of uranium feed materials from 1952 until 1989, the site was subsequently included on the U.S. Environmental Protection Agency's National Priorities List and slated for cleanup. Except for contaminated ground water, cleanup of the site will be completed in 2006; remediation of the aquifer will continue for 20 years. Transition of the project from the U.S. Department of Energy Office of Environmental Management to the Office of Legacy Management will be effected when site cleanup is completed, surface restoration is complete, and aquifer remediation is on-going. Office of Legacy Management activities will focus on the monitoring and maintenance of the on-site disposal facility, enforcement of restrictions on site access and use, and the protection of natural and cultural resources. The Site Transition Plan, developed in accordance with Site Transition Framework guidance, identifies organizational and financial responsibilities for attaining closeout. A Transition Matrix details more than 1,000 activities necessary for site transition and allows each task to be tracked. Responsibility Transition Plans address major areas of scope to be transferred, such as records and information management, infrastructure, and environmental monitoring. Much effort has been placed on the retention of staff to perform the identified Office of Legacy Management scope. (authors)

  11. Summary - Idaho CERCLA Disposal Facility (ICDF) at Idaho National Laboratory

    Office of Environmental Management (EM)

    INL, Idaho EM Project: Idaho CERCLA Disposal Facility ETR Report Date: December 2007 ETR-10 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Idaho CERCLA Disposal Facility (ICDF) At Idaho National Laboratory (INL) Why DOE-EM Did This Review The Idaho CERCLA Disposal Facility (ICDF) is a land disposal facility that is used to dispose of LLW and MLW generated from remedial activities at the Idaho National Laboratory (INL). Components of

  12. 2012 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 11/20/12 Energy Department Announces New Investment in U.S. Small Modular Reactor Design and Commercialization 11/08/12 DOE appoints three new members to advisory board 09/27/12 New Video Puts INL Waste Inventories into Context 09/12/12 DOE extends the Idaho Cleanup Project contract for three years 09/10/12 Department of Energy's Idaho Site have reduced environmental liabilities, increased taxpayer savings and advanced the nation's science and energy missions. 07/17/12 Energy Department

  13. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building

    Broader source: Energy.gov [DOE]

    Beta 4, one of the oldest and largest buildings at the Y-12 National Security Complex, recently reached a significant cleanup milestone. The second floor of the building, more than 82,000 square feet, has been cleared of large equipment and waste from Cold War operations.

  14. Lawrence Berkeley National Laboratory Launches Cleanup and Demolition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project June 30, 2015 - 12:00pm ...

  15. Idaho Governor Praises DOE, Contractor Effort for Resuming Critical...

    Office of Environmental Management (EM)

    ... Addthis Related Articles Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. A Decade of Cleanup Progress at EM's Idaho Site Only the 620 ...

  16. EM Contractor’s Success in Addressing Challenging Waste Leads to More Cleanup Work

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program’s Idaho Site cleanup contractor CH2M-WG Idaho’s (CWI) success last year in treating and packaging 6,000 drums of radioactive and hazardous waste left over from the Cold War weapons program has spawned additional cleanup work for the company.

  17. Defense Secretary Awards EM Idaho Contractor Freedom Award at Pentagon

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – CH2M-WG Idaho (CWI), the main cleanup contractor for the EM program at the Idaho Operations Office, received the Secretary of Defense Employer Support Freedom Award at the Pentagon for its support of National Guard and Reserve employees.

  18. In-situ gamma-analysis support for Phase I, Middlesex cleanup project, Middlesex, New Jersey

    SciTech Connect (OSTI)

    Reiman, R.T.

    1983-07-01

    At the request of the Department of Energy, the Energy Measurements Group of EG and G participated in the Remedial Action program for the former Middlesex Sampling Plant and associated properties at Middlesex, New Jersey from July to November 1980. EG and G provided real time analysis of the radiological character of the soil of each property included in the Phase I cleanup before, during, and after decontamination. The method used for the analysis was in situ gamma spectroscopy employing a high purity germanium detector. This report describes the in situ system and displays the results of the in situ measurements before and after decontamination of the properties surveyed during Phase I.

  19. EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP)

    Broader source: Energy.gov [DOE]

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National...

  20. Agencies announce third site-wide five-year review of cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    five-year review of cleanup at the U.S. Department of Energy's Idaho Site. Five-year reviews evaluate the protectiveness of completed and ongoing cleanup actions as required...

  1. Cleanup at Rocky Flats

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download February 22, 2016 Cleanup Progress Report - 2015 Oak Ridge's cleanup accomplishments during 2015. January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup

  2. Boise, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Grid Project Registered Research Institutions in Boise, Idaho Boise State University, CAES Energy Efficiency Research Institute Registered Energy Companies in Boise, Idaho Inovus...

  3. Idaho Wind Energy | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Jump to: navigation, search Name: Idaho Wind Energy Place: Tetonia, Idaho Zip: 83452 Sector: Geothermal energy, Wind energy Product: A geothermal and wind project...

  4. DOE Awards Small Business Contract to Support Cleanup of New...

    Energy Savers [EERE]

    Small Business Contract to Support Cleanup of New York West Valley Demonstration Project DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration ...

  5. Oak Ridge National Laboratory Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE)

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the Oak Ridge National Laboratory.

  6. East Tennessee Technology Park Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE)

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the East Tennessee Technology Park.

  7. Idaho County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Grangeville, Idaho Kamiah, Idaho Kooskia, Idaho Riggins, Idaho Stites, Idaho White Bird, Idaho Retrieved from "http:en.openei.orgwindex.php?titleIdahoCounty,Idaho&oldid...

  8. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    SciTech Connect (OSTI)

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  9. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    SciTech Connect (OSTI)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  10. EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

  11. Mission Need Statement for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Lisa Harvego

    2009-06-01

    The Idaho National Laboratory proposes to establish replacement remote-handled low-level waste disposal capability to meet Nuclear Energy and Naval Reactors mission-critical, remote-handled low-level waste disposal needs beyond planned cessation of existing disposal capability at the end of Fiscal Year 2015. Remote-handled low-level waste is generated from nuclear programs conducted at the Idaho National Laboratory, including spent nuclear fuel handling and operations at the Naval Reactors Facility and operations at the Advanced Test Reactor. Remote-handled low-level waste also will be generated by new programs and from segregation and treatment (as necessary) of remote-handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex. Replacement disposal capability must be in place by Fiscal Year 2016 to support uninterrupted Idaho operations. This mission need statement provides the basis for the laboratory’s recommendation to the Department of Energy to proceed with establishing the replacement remote-handled low-level waste disposal capability, project assumptions and constraints, and preliminary cost and schedule information for developing the proposed capability. Without continued remote-handled low-level waste disposal capability, Department of Energy missions at the Idaho National Laboratory would be jeopardized, including operations at the Naval Reactors Facility that are critical to effective execution of the Naval Nuclear Propulsion Program and national security. Remote-handled low-level waste disposal capability is also critical to the Department of Energy’s ability to meet obligations with the State of Idaho.

  12. Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

    SciTech Connect (OSTI)

    Michael A. Lehto, Ph.D.; Boyd D. Christensen

    2008-05-01

    Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by

  13. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling

    Broader source: Energy.gov [DOE]

    The Alpha 5 Legacy Material Disposition project at Y-12 recently celebrated the early completion of a significant project milestone. The fourth floor of Alpha 5 has been cleared of 5,430 containers of legacy materials, which includes any equipment and materials not bolted or secured to the facility.

  14. Idaho Site Launches Corrective Actions Before Restarting Waste Treatment Facility

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho – The Idaho site and its cleanup contractor have launched a series of corrective actions they will complete before safely resuming startup operations at the Integrated Waste Treatment Unit (IWTU) following an incident in June that caused the new waste treatment facility to shut down.

  15. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how

  16. IDAHO BIODIESEL INFRASTRUCTURE PROJECT DOE'S INITIATIVE ON COOPERATIVE PROGRAMS WITH STATES FOR RESEARCH, DEVELOPMENT AND DEMONSTRATION GRANT NO. DE-FC36-02GO12021. Final report

    SciTech Connect (OSTI)

    CROCKETT, JOHN

    2006-12-31

    The Idaho Energy Division issued a Request for Proposal (RFP) on March 14, 2006, inviting qualified licensed fuel wholesalers, fuel retailers, and vehicle fleet operators to provide proposals to construct and/or install infrastructure for biodiesel utilization in Idaho. The intent was to improve the ability of private and/or non-Federal public entities in Idaho to store, transport, or offer for sale biodiesel within the state. The RFP provided up $100,000 for co-funding the projects with a minimum 50% cash cost match. Four contracts were subsequetnly awarded that resulted in three new bidodiesel storage facilities immediately serving about 45 fueling stations from Sandpoint to Boise. The project also attracted considerable media attention and Idaho became more knowledgeable about biodiesel.

  17. Idaho Crews Overcome Challenges to Safely Dispose 1-Million-Pound Hot Cell

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act cleanup crews at the Idaho site recently disposed of a hot cell as heavy as nine fully loaded Boeing 737s.

  18. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Feature Stories community-environmentassetsimagesicon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past,...

  19. Post-Cleanup Communication and Records Plan for Project Chariot, Alaska

    SciTech Connect (OSTI)

    2005-01-01

    The Project Chariot Site resides in a remote and isolated area in the Cape Thompson region of northwest Alaska (Figure 1-1). The Project Chariot Site was a proposed test location for the U.S. Atomic Energy Commission (AEC) Plowshare Program in 1958. In 1962, the United States Geological Survey (USGS) conducted environmental studies using less than 30 mCi of short-lived mixed fission products. The location of the studies was about 0.75 mile (1.2 km) north of the Project Chariot Site base camp. Radioactive material was spread over the 12 test plots: 10 were used for overland transport tracer tests, one for a sediment transport experiment, and one for an 18-hour percolation test. The 11 test plots constituted an area less than 0.9 percent of an acre. At the conclusion of the August 1962 tracer test, USGS scraped the ground surface of the test plots and the percolation test location. The scraped soil and vegetation were mixed with native soil, deposited in a mound on two of the plots, and covered with 4 ft (1.22 m) of uncontaminated soil (DOE 1993).

  20. Upper Los Alamos Canyon Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory

  1. Microsoft Word - Transmittal of the Final Audit Report for the Idaho National Laboratory-Central Characterization Project A-09-

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17:UFC 2300.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 August 6, 2009 Mr. James Bearzi, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bldg. 1 Santa Fe, New Mexico 87505-6303 Subject: Final Audit Report for the Idaho National Laboratory/Central Characterization Project A-09-08 Dear Mr. Bearzi: As requested in your letter dated August 4, 2009, the Carlsbad Field Office withdraws the final audit report A-09-08

  2. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    SciTech Connect (OSTI)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  3. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect (OSTI)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  4. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect (OSTI)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  5. A life-cycle model approach to multimedia waste reduction measuring performance for environmental cleanup projects

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.; George, S.M.

    1993-07-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program`s mission is to minimize waste and prevent pollution in remedial investigations (RIs), feasibility studies, decontamination and decommissioning, and surveillance and maintenance site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. The ER Program waste generation rates are projected to steadily increase through the year 2005 for all waste categories. Standard production units utilized to measure waste minimization apply to production/manufacturing facilities. Since ER inherited contaminated waste from previous production processes, no historical production data can be applied. Therefore, a more accurate measure for pollution prevention was identified as a need for the ER Program. The Energy Systems ER Program adopted a life-cycle model approach and implemented the concept of numerically scoring their waste generators to measure the effectiveness of pollution prevention/waste minimization programs and elected to develop a numerical scoring system (NSS) to accomplish these measurements. The prototype NSS, a computerized, user-friendly information management database system, was designed to be utilized in each phase of the ER Program. The NSS was designed to measure a generator`s success in incorporating pollution prevention in their work plans and reducing investigation-derived waste (IDW) during RIs. Energy Systems is producing a fully developed NSS and actually scoring the generators of IDW at six ER Program sites. Once RI waste generators are scored utilizing the NSS, the numerical scores are distributed into six performance categories: training, self-assessment, field implementation, documentation, technology transfer, and planning.

  6. National Cleanup Workshops | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    executives, and other stakeholders to discuss EM's progress in the cleanup of the environmental legacy of the nation's Manhattan Project and Cold War nuclear weapons program. ...

  7. EA-1901: Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE’s Bonneville Power Administration to support the Kootenai Tribe of Idaho’s construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort.

  8. 2010 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 12/22/10 Idaho National Laboratory Stand-Off Experiment Range draft environmental assessment available for public review and comment 11/30/10 PIT 9: From "Black Eye" to Part of DOE Cleanup Success 10/19/10 GreenGov Presidential Award 10/14/10 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Radiological Response Training Range 10/08/10 WIPP receives 9,000th shipment 09/30/10 Grouting project to protect Snake River Plain Aquifer completed ahead of

  9. Voluntary Protection Program Onsite Review, Idaho Treatment Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste ...

  10. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  11. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2010 SUBJECT: Release of the Finding of No Significant Impact and the Final Enviromnental Assessment for the MUltipurpose Haul Road Within the Idaho National Laboratory Site Dear Citizen: Thank you for your interest in the Finding of No Significant Impact (FONSI) and the Final Enviromnental Assessment (EA) for the Multipurpose Haul Road Within the Idaho National Laboratory Site (enclosed). All comments on this project and the potential enviromnental impacts have been addressed and the

  12. Accelerating cleanup: Paths to closure

    SciTech Connect (OSTI)

    1998-06-01

    This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

  13. Y-12 National Security Complex Cleanup

    Broader source: Energy.gov [DOE]

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects completed at the Y-12 National Security Complex.

  14. EM’s Idaho Site Pilot Study of Device Leads to its Launch Complex-Wide

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM’s Idaho Site employees are being commended for leadership and initiative in exploring the use of a new mobile computing device that is now in the hands of about 100 employees across the cleanup complex.

  15. Training Reciprocity Achieves Greater Consistency, Saves Time and Money for Idaho, Other DOE Sites

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Contracting companies supporting EM’s cleanup program at the Idaho site volunteered to be among the first to use a new DOE training reciprocity program designed to bring more consistency to health and safety training across the complex, reduce redundancy and realize savings and other efficiencies.

  16. Idaho National Laboratory - WAG-7 | Department of Energy

    Office of Environmental Management (EM)

    Idaho National Laboratory - WAG-7 Idaho National Laboratory - WAG-7 January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Idaho National Laboratory, ID Responsible DOE Office: Office of Nuclear Energy Plume Name: WAG-7 Remediation Contractor: CWI PBS Number: 30 Report Last Updated: 2014 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup Requirement CCI4 5.43 Yes 5

  17. Idaho Operations Office: Technology summary, June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  18. Microsoft Word - California_cleanup.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Completes California Sites Cleanup CARLSBAD, N.M., June 14, 2010 - The U.S. Department of Energy's Carlsbad Field Office (CBFO) has successfully completed its campaign to clean up all defense- related transuranic (TRU) waste at California's Vallecitos Nuclear Center (VNC) near Sunol and Lawrence Livermore National Laboratory (LLNL) Site 300, east of Livermore. The last shipment of defense related TRU waste from VNC was shipped to Idaho National Laboratory on June 7. Following the

  19. Enforcement Letter, CH2M-WG Idaho - September 28, 2011 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory ... of the Sodium Bearing Waste Treatment Project at DOE's Idaho National Laboratory. ...

  20. Microsoft Word - DOE-ID-13-031 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31 SECTION A. Project Title: Doubling The Life of Concrete Structures - University of Idaho SECTION B. Project Description The University of Idaho proposes to study the transport...

  1. Idaho IFPTE

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory’s (INL) mission is to ensure the nation’s energy security with safe, competitive, and sustainable energy systems and unique national and homeland security capabilities. To...

  2. Environmental Cleanup Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Audit of Moab Mill Tailings Cleanup Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah...

  3. Environmental Cleanup Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Reports Environmental Cleanup Reports June 2, 2015 Audit Report: DOE/IG-0937 The Status of Cleanup at the Department of Energy's Paducah Site September 18, 2014 Audit Report: OAS-M-14-11 Follow-Up on the Management of the Plutonium Finishing Plant Project September 26, 2013 Audit Report: OAS-L-13-15 The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory August 8, 2013 Audit Report: OAS-M-13-03 Cost Transfers at the Department's

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... - Idaho Cleanup Project (United States) Idaho National Laboratory Specific Manufacturing Plant Idaho National Laboratory, Idaho Falls, ID (United States) Idaho Operations ...

  5. Search for: All records | SciTech Connect

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Idaho Cleanup Project (United States) Idaho National Laboratory Specific Manufacturing Plant Idaho National Laboratory, Idaho Falls, ID (United States) Idaho Operations...

  6. 2013 Annual Planning Summary for the Idaho Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Idaho Operations Office.

  7. 2012 Annual Planning Summary for Idaho Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Idaho Operations Office.

  8. Bannock County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    B. Places in Bannock County, Idaho Arimo, Idaho Chubbuck, Idaho Downey, Idaho Fort Hall, Idaho Inkom, Idaho Lava Hot Springs, Idaho McCammon, Idaho Pocatello, Idaho Retrieved...

  9. Bonner County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype B. Places in Bonner County, Idaho Clark Fork, Idaho Dover, Idaho East Hope, Idaho Hope, Idaho Kootenai, Idaho Oldtown, Idaho Ponderay, Idaho Priest River, Idaho...

  10. Bonneville County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Inc Places in Bonneville County, Idaho Ammon, Idaho Idaho Falls, Idaho Iona, Idaho Irwin, Idaho Ririe, Idaho Swan Valley, Idaho Ucon, Idaho Retrieved from "http:...

  11. Canyon County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    B. Places in Canyon County, Idaho Caldwell, Idaho Greenleaf, Idaho Melba, Idaho Middleton, Idaho Nampa, Idaho Notus, Idaho Parma, Idaho Wilder, Idaho Retrieved from "http:...

  12. Water Integration Project Science Strategies White Paper

    SciTech Connect (OSTI)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  13. Idaho Geological Survey and University of Idaho Explore for Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Geological Survey and University of Idaho Explore for Geothermal Energy Idaho Geological Survey and University of Idaho Explore for Geothermal Energy January 11, 2013 -...

  14. Idaho - Idaho Dept. of Lands - Application for Easement | Open...

    Open Energy Info (EERE)

    Easement. Boise, Idaho. Idaho Department of Lands. Easement Application Instructions; 4p. Retrieved from "http:en.openei.orgwindex.php?titleIdaho-IdahoDept.ofLands-A...

  15. DOE-Idaho Operations Summary For June 19 to July 12, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... at the Idaho Subsurface Disposal Facility is about 54 percent complete, with ...

  16. DOE-Idaho Operations Summary For Dec. 9 to Dec. 21, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... procedures while performing work at an Idaho Falls laboratory facility. ...

  17. 2016 National Cleanup Workshop | Department of Energy

    Office of Environmental Management (EM)

    6 National Cleanup Workshop 2016 National Cleanup Workshop 2016 National Cleanup Workshop The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop ...

  18. Site Transition Process Upon Cleanup Completion | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup ...

  19. EM Contractor’s Role in Energy-Conservation Challenge Pays Off for Idaho Site

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – A challenge issued three years ago by a facility director to his staff at the Idaho Site has resulted in the implementation of several energy-conservation projects and huge cost savings to taxpayers.

  20. HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP

    SciTech Connect (OSTI)

    Guillen, Donna Post; Nielson, R. Bruce; Phillips, Ann Marie; Lebow, Scott

    2003-02-27

    The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist.

  1. Idaho National Laboratory - WAG-1 | Department of Energy

    Office of Environmental Management (EM)

    1 Idaho National Laboratory - WAG-1 January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report Installation Name, State: Idaho National Laboratory, ID Responsible DOE Office: Office of Nuclear Energy Plume Name: WAG-1 Remediation Contractor: CWI PBS Number: 30 Report Last Updated: 2014 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup Requirement PCE 21 Yes 5 TCE 1272 Yes 5 VC 7 Yes 2 cis-1,2-DCE

  2. Idaho_Site_By_The_Numbers_August_2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho National Laboratory (INL) site, a 890-square-mile Department of Energy site located in the high desert of eastern Idaho, was established in 1949 on land once used as a Naval gunnery range. The cleanup involves contamination from legacy wastes generated from World War II-era conventional weapons testing, government-owned research and defense reactors, spent nuclear fuel reprocessing, laboratory research, and defense missions at other DOE sites. Main focus areas are reducing risks to

  3. Seismic Reflection Project Near the Southern Terminations of the Lost River and Lemhi Faults, Eastern Snake River Plain, Idaho

    SciTech Connect (OSTI)

    S. M. Jackson; G. S. Carpenter; R. P. Smith; J. L. Casper

    2006-10-01

    Thirteen seismic reflection lines were processed and interpreted to determine the southern terminations of the Lost River and Lemhi faults along the northwest boundary of the eastern Snake River Plain (ESRP). The southernmost terminations of the Arco and Howe segments were determined to support characterization of the Lost River and Lemhi fault sources, respectively, for the INL probabilistic seismic hazard analysis. Keywords:Keywords are required forExternal Release Review*Keywords  Keywords *Contacts (Type and Name are required for each row) Type ofContactContact Name  POC Editor RecordFour commercial seismic reflection lines (Arco lines 81-1 and 81-2; Howe lines 81-3 and 82-2) were obtained from the Montana Power Company. The seismic data were collected in the early 1980’s using a Vibroseis source with station and shot point locations that resulted in 12-fold data. Arco lines 81?1 and 81?2 and Howe lines 81?3 and 82?2 are located within the basins adjacent to the Arco and Howe segments, respectively. Seven seismic lines (Arco lines A1, A2, A3, and A4 and Howe lines H1, H2, and H3) were acquired by EG&G Idaho, Inc. Geosciences for this study using multiple impacts with an accelerated weight drop source. Station and shot point locations yielded 12-fold data. The seismic reflection lines are oriented perpendicular to and at locations along the projected extensions of the Arco and Howe fault segments within the ESRP. Two seismic lines (Arco line S2 and Howe line S4) were obtained from Sierra Geophysics. In 1984, they acquired seismic reflection data using an accelerated weight drop source with station and shot point locations that yielded 6-fold data. The two seismic reflection lines are oriented perpendicular to and at locations along the projected extensions of the Arco and Howe fault segments within the ESRP. In 1992 for this study, Geotrace Technologies Inc. processed all of the seismic reflection data using industry standard processing techniques. The

  4. Cleanup Progress Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download February 22, 2016 Cleanup Progress Report - 2015 Oak Ridge's cleanup accomplishments during 2015. January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup

  5. Final Hanford Offsite Waste Shipment Leaves Idaho Treatment Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Advanced Mixed Waste Treatment Project (AMWTP) recently completed the last of 25 shipments of waste bound for permanent disposal in New Mexico and Nevada, six months ahead of a regulatory deadline.

  6. Idaho Operations AMWTP Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Waste Management » Tank Waste and Waste Processing » Idaho Operations AMWTP Fact Sheet Idaho Operations AMWTP Fact Sheet The Department of Energy's Idaho Operations Advanced Mixed Waste Treatment Project (AMWTP) is the nation's premier transuranic radioactive waste facility. This fact sheet provides an overview of the the project. Idaho Treatment Group AMWTP Fact Sheet (13.84 MB) More Documents & Publications Greenpower Trap Mufflerl System CERTIFIED REALTY SPECIALIST Heating

  7. Idaho Cold War Waste Removal Advancing as Work on Eighth Area Begins

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller, (208) 569-7806 Erik Simpson, (208) 390-9464 For Immediate Release: January 13, 2014 Idaho Cold War Waste Removal Advancing as Work on Eighth Area Begins IDAHO FALLS, ID - The U.S. Department of Energy and Idaho site cleanup contractor CH2M-WG Idaho (CWI) have begun removing Cold War weapons waste at the eighth area of the 97-acre Subsurface Disposal Area (SDA). The Idaho Site contains a total of nine targeted waste areas within the SDA. To date, six retrieval areas have been

  8. Idaho | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Idaho Following are links to compliance agreements involving the Idaho site. Brief summaries of the agreements also are included. Public Service Company of Colorado v. Batt Agreement (242.17 KB) Public Service Company of Colorado v. Batt Agreement Summary (44.18 KB) Idaho National Engineering & Environmental Laboratory Consent Order, January 25, 2001 (387.05 KB) Idaho National Engineering & Environmental Laboratory Consent Order, January 25, 2001 Summary (42.21 KB) Idaho National

  9. U.S. Department of Energy Keeps Its Cleanup Commitments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy Keeps Its Cleanup Commitments By ELIZABETH SELLERS As significant progress continues on cleanup of legacy environmental challenges at the Idaho National Laboratory, there are two points I'd like to emphasize: Workers sort previously-buried waste. Inside of underground waste storage tank after cleaning was completed ready for grouting to begin. The U.S. Department of Energy is keeping its promises to Idahoans. In the last 20 years, DOE has met, on time or ahead of

  10. EM Completes Project to Maintain Water Quality of Spent Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This was an outstanding accomplishment." Addthis Related Articles Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. A Decade of Cleanup ...