  1. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  2. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  3. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  4. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  5. Idaho Cleanup Project Congressional Nuclear Cleanup Caucus

    Energy Savers [EERE]

    Cleanup Program April 30, 2014 Thomas J. Dieter, CH2M-WG Idaho Danny Nichols, Idaho Treatment Group 2 www.energy.gov/EM The Idaho Site Background * 890 Square Miles * Remote location in the southeast region of Idaho * Established in 1949 as the Naval Gunnery Range * Currently referred to as the Idaho National Laboratory * Provided an isolated location where 52 first-of-a-kind test reactors could be designed, built and tested with one still in operation (Advanced Test Reactor) * EM's Idaho

  6. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOEs Idaho site.

  7. Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...

    Office of Environmental Management (EM)

    Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste ... Independent Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup ...

  8. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Solicitations > ICP Contract Idaho Cleanup Project Contract Basic Contract Contract Modifications Documents Related to the ICP Contract Last Updated: 11/04/2015 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  9. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  10. Idaho Cleanup Project Clearance Limits for Personal Property | Department

    Office of Environmental Management (EM)

    of Energy Idaho Cleanup Project Clearance Limits for Personal Property Idaho Cleanup Project Clearance Limits for Personal Property Kevin Konzen*, CH2M-WG Idaho, LLC ; Craig Nesshoefer, Idaho Cleanup Project Abstract: CH2M-WG Idaho, LLC (CWI) had sought alternative surface clearance limits for personal property from those referenced in DOE Order 458.1, which were approved September 2013 by the Department of Energy. Because much of the property would remain within DOE control, implementation

  11. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing

    Office of Environmental Management (EM)

    Waste Treatment Project - November 2012 | Department of Energy Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report provides the results of an independent assessment of nuclear safety culture at the Sodium Bearing Waste Treatment

  12. Enterprise Assessments Review, Idaho Cleanup Project - September 2014 |

    Office of Environmental Management (EM)

    Department of Energy Idaho Cleanup Project - September 2014 Enterprise Assessments Review, Idaho Cleanup Project - September 2014 September 2014 Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's Independent Oversight Program for the Department's former Office

  13. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015. Today's contract

  14. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Facilities Engineering Services KCP, LLC during the period of June 4-15, 2007, and provides the Chief Health, Safety and Security Officer with

  15. DOE Issues Draft RFP for Idaho Cleanup Project Core

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement.

  16. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  17. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Environmental Management (EM)

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  18. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  19. DOE Awards Contract for Idaho Clean-up Project (ICP) Core

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in support of the DOE Office of Environmental Management’s cleanup mission at the Idaho Site.

  20. DOE extends the Idaho Cleanup Project Contract for Three Years | Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract

  1. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  2. DOE Issues Final RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final RFP for Idaho Cleanup Project Core DOE Issues Final RFP for Idaho Cleanup Project Core March 13, 2015 - 2:00pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709, millerdc@id.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be complete in Idaho and remaining

  3. Idaho Cleanup Project completes work at Test Area North complex at DOE�s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho site Idaho Cleanup Project completes work at Test Area North complex at DOE�s Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all the original contract work scope at the U.S. Department of Energy�s Idaho Site�s Test Area North (TAN) complex. The work involved close cooperation among the Department of Energy, the Environmental Protection Agency and the Idaho Department of Environmental Quality, with public input incorporated

  4. Idaho Cleanup Project ships first Recovery Act-funded remote-handled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste out of Idaho THE IDAHO SITE NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 Joseph Campbell (CWI) 208-360-0142 For Immediate Release March 18, 2010 Idaho Cleanup Project ships first Recovery Act- funded remote-handled transuranic waste out of Idaho DATELINE - The Idaho Cleanup Project made its first shipment of remote-handled transuranic waste funded by the American Recovery and Reinvestment Act on March 11, 2010. This is the first of approximately 150 shipments

  5. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect (OSTI)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  6. IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Department of Energy for other cleanup work at the INL, including decontaminating and decommissioning three nuclear reactors - started in 2005 and completed last year. That...

  7. Idaho Site Workers Continue to Finish D&D Cleanup Projects Under Budget

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – CH2M-WG Idaho, LLC, (CWI) the main cleanup contractor for the EM program at the Idaho Site, took on additional work scope at the site’s Materials and Fuels Complex (MFC) after completing grouting work at the decommissioned Experimental Breeder Reactor-II (EBF-II) three months ahead of schedule and $110,000 under budget this year.

  8. Idaho Cleanup Project CPP-603A basin deactivation waste management 2007

    SciTech Connect (OSTI)

    Croson, D.V.; Davis, R.H.; Cooper, W.B.

    2007-07-01

    The CPP-603A basin facility is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the U.S. Department of Energy's (DOE) Idaho National Laboratory (INL). CPP-603A operations are part of the Idaho Cleanup Project (ICP) that is managed by CH2M-WG Idaho, LLC (CWI). Once the inventoried fuel was removed from the basins, they were no longer needed for fuel storage. However, they were still filled with water to provide shielding from high activity debris and contamination, and had to either be maintained so the basins did not present a threat to public or worker health and safety, or be isolated from the environment. The CPP-603A basins contained an estimated 50,000 kg (110,200 lbs) of sludge. The sludge was composed of desert sand, dust, precipitated corrosion products, and metal particles from past cutting operations. The sediment also contained hazardous constituents and radioactive contamination, including cadmium, lead, and U-235. An Engineering Evaluation/Cost Analysis (EE/CA), conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), evaluated the risks associated with deactivation of the basins and the alternatives for addressing those risks. The recommended action identified in the Action Memorandum was to perform interim stabilization of the basins. The sludge in the basins was removed and treated in accordance with the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) and disposed at the INL Radioactive Waste Management Complex (RWMC). A Non-Time Critical Removal Action (NTCRA) was conducted under CERCLA to reduce or eliminate other hazards associated with maintaining the facility. The CERCLA NTCRA included removing a small high-activity debris object (SHADO 1); consolidating and mapping the location of debris objects containing Co-60; removing, treating, and disposing of the basin water; and filling the basins with grout/controlled low strength material (CLSM). The NTCRA is an interim action that reduces the risks to human health and the environment by minimizing the potential for release of hazardous substances. The interim action does not prejudice the final end-state alternative. (authors)

  9. DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced Mixed Waste Treatment Project: Contract will continue cleanup and waste operations at the Idaho Site

    Broader source: Energy.gov [DOE]

    Idaho Falls – In order to further meet the U.S. Department of Energy’s commitments to the citizens of the state of Idaho, the DOE today announced that it has selected Idaho Treatment Group, LLC (ITG) to perform waste processing at the Advanced Mixed Waste Treatment Project (AMWTP) at DOE’s Idaho Site near Idaho Falls.

  10. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment

    Office of Environmental Management (EM)

    April 14, 2011 IDAHO FALLS, Idaho - For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a de- commissioned nuclear reactor using an innovative treatment process. The Ameri- can Recovery and Reinvestment Act invested $70 million in the project, which employs 130 workers. DOE officials cheered the outcome and praised the team that designed and imple- mented the innovative sodium treatment for which the DOE has filed a

  11. MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho

    Office of Environmental Management (EM)

    MAJOR CONFORMED CONTRACTS LINKS SiteProject Contract Link Idaho Idaho Cleanup Project http:www.id.doe.govdoeidICPContractICPContract.htm Advance Mixed Waste Treatment http:...

  12. Stimulus Funding Will Accelerate Cleanup In Idaho

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CLEANUP PROJECT ARRA FACT SHEET 1119 Kb Energy Secretary Chu Announces 6 Billion in Recovery Act Funding for Environmental Cleanup 88 Kb Editorial Date March 31, 2008 By Bradley...

  13. Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup |

    Energy Savers [EERE]

    Department of Energy 9 Billion Contract for Idaho Site Cleanup Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup March 23, 2005 - 11:07am Addthis WASHINGTON, D.C. - The United States Department of Energy today announced the selection of CH2M-WG Idaho, LLC as the contractor responsible for the Idaho Cleanup Project through the year 2012 at the Idaho National Laboratory (INL). "We are pleased to announce this selection to ensure a seamless transition and continued

  14. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  15. Retrieval System for Calcined Waste for the Idaho Cleanup Project - 12104

    SciTech Connect (OSTI)

    Eastman, Randy L.; Johnston, Beau A.; Lower, Danielle E.

    2012-07-01

    This paper describes the conceptual approach to retrieve radioactive calcine waste, hereafter called calcine, from stainless steel storage bins contained within concrete vaults. The retrieval system will allow evacuation of the granular solids (calcine) from the storage bins through the use of stationary vacuum nozzles. The nozzles will use air jets for calcine fluidization and will be able to rotate and direct the fluidization or displacement of the calcine within the bin. Each bin will have a single retrieval system installed prior to operation to prevent worker exposure to the high radiation fields. The addition of an articulated camera arm will allow for operations monitoring and will be equipped with contingency tools to aid in calcine removal. Possible challenges (calcine bridging and rat-holing) associated with calcine retrieval and transport, including potential solutions for bin pressurization, calcine fluidization and waste confinement, are also addressed. The Calcine Disposition Project has the responsibility to retrieve, treat, and package HLW calcine. The calcine retrieval system has been designed to incorporate the functions and technical characteristics as established by the retrieval system functional analysis. By adequately implementing the highest ranking technical characteristics into the design of the retrieval system, the system will be able to satisfy the functional requirements. The retrieval system conceptual design provides the means for removing bulk calcine from the bins of the CSSF vaults. Top-down vacuum retrieval coupled with an articulating camera arm will allow for a robust, contained process capable of evacuating bulk calcine from bins and transporting it to the processing facility. The system is designed to fluidize, vacuum, transport and direct the calcine from its current location to the CSSF roof-top transport lines. An articulating camera arm, deployed through an adjacent access riser, will work in conjunction with the retrieval nozzle to aid in calcine fluidization, remote viewing, clumped calcine breaking and recovery from off-normal conditions. As the design of the retrieval system progresses from conceptual to preliminary, increasing attention will be directed toward detailed design and proof-of- concept testing. (authors)

  16. DOE Idaho site reaches 20-year cleanup milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major

  17. Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC07-05ID14516 Modifications You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > ICP Contract > ICP Basic Contract Blue Line Link to free copy of Acrobat Reader Some of the documents on this page are in the Adobe PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat Reader, you may download the Reader FREE by clicking on the icon on the left. Please note that URL addresses in PDF documents will not

  18. Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed; Report Now Available Online | Department of Energy Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE)

  19. Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup

  20. Idaho Site Completes Cleanup Milestone Ahead of Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel

  1. Processing Plan for Potentially Reactive/Ignitable Remote Handled Transuranic Waste at the Idaho Cleanup Project - 12090

    SciTech Connect (OSTI)

    Troescher, Patrick D.; Hobbes, Tammy L.; Anderson, Scott A.

    2012-07-01

    Remote Handle Transuranic (RH-TRU) Waste generated at Argonne National Laboratory - East, from the examination of irradiated and un-irradiated fuel pins and other reactor materials requires a detailed processing plan to ensure reactive/ignitable material is absent to meet WIPP Waste Acceptance Criteria prior to shipping and disposal. The Idaho Cleanup Project (ICP) approach to repackaging Lot 2 waste and how we ensure prohibited materials are not present in waste intended for disposal at Waste Isolation Pilot Plant 'WIPP' uses an Argon Repackaging Station (ARS), which provides an inert gas blanket. Opening of the Lot 2 containers under an argon gas blanket is proposed to be completed in the ARS. The ARS is an interim transition repackaging station that provides a mitigation technique to reduce the chances of a reoccurrence of a thermal event prior to rendering the waste 'Safe'. The consequences, should another thermal event be encountered, (which is likely) is to package the waste, apply the reactive and or ignitable codes to the container, and store until the future treatment permit and process are available. This is the same disposition that the two earlier containers in the 'Thermal Events' were assigned. By performing the initial handling under an inert gas blanket, the waste can sorted and segregate the fines and add the Met-L-X to minimize risk before it is exposed to air. The 1-gal cans that are inside the ANL-E canister will be removed and each can is moved to the ARS for repackaging. In the ARS, the 1-gal can is opened in the inerted environment. The contained waste is sorted, weighed, and visually examined for non compliant items such as unvented aerosol cans and liquids. The contents of the paint cans are transferred into a sieve and manipulated to allow the fines, if any, to be separated into the tray below. The fines are weighed and then blended with a minimum 5:1 mix of Met-L-X. Other debris materials found are segregated from the cans into containers for later packaging. Recoverable fissile waste material (Fuel and fuel-like pieces) suspected of containing sodium bonded pieces) are segregated and will remain in the sieve or transferred to a similar immersion basket in the ARS. The fuel like pieces will be placed into a container with sufficient water to cover the recoverable fissile waste. If a 'reactive characteristic' is present the operator will be able to observe the formation of 'violent' hydrogen gas bubbles. When sodium bonded fuel-like pieces are placed in water the expected reaction is a non-violent reaction that does not meet the definition of reactivity. It is expected that there will be a visible small stream of bubbles present if there is any sodium-bonded fuel-like piece placed in the water. The test will be completed when there is no reaction or the expected reaction is observed..At that point, the fuel like pieces complete the processing cycle in preparation for characterization and shipment to WIPP. If a violent reaction occurs, the fuel-like pieces will be removed from the water, split into the required fissile material content, placed into a screened basket in a 1 gallon drum and drummed out of the hot cell with appropriate RCRA codes applied and placed into storage until sodium treatment is available. These 'violent' reactions will be evidenced by gas bubbles being evolved at the specimen surface where sodium metal is present. The operators will be trained to determine if the reaction is 'violent' or 'mild'. If a 'violent' reaction occurs, the sieve will be immediately removed from the water, placed in a 1 gallon paint can, canned in the argon cover gas and removed from the hot cell to await a future treatment. If the reaction is 'mild', the sieve will then be removed from the water; the material weighed for final packaging and allowed to dry by air exposure. Lot 2 waste cans can be opened, sorted, processed, and weighed while mitigating the potential of thermal events that could occur prior to exposing to air. Exposure to air is a WIPP compliance step demonstrating the absence of react

  2. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment

    Broader source: Energy.gov [DOE]

    For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment...

  3. Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    community Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in community IDAHO FALLS � American Recovery and Reinvestment Act (ARRA) funding has accelerated a project to ship decades-old remote-handled transuranic waste out of Idaho. The project is one of several ARRA-funded projects at the U.S. Department of Energy�s Idaho Site that has contributed to the creation of 652 additional jobs. �Recovery Act funding allowed us to accelerate the disposal of this waste by

  4. Idaho Site Closes Out Decontamination and Decommissioning Project about $440 Million under Cost

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho Cleanup Project (ICP) successfully closed out a $796 million nuclear facility decontamination and decommissioning project. The work was completed about $440 million under cost.

  5. Idaho Cleanup Contractor Surpasses Significant Safety Milestones

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury.

  6. Stimulus Funding Creating Cleanup Jobs At DOE�s Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stimulus Funding Creating Cleanup Jobs At DOE�s Idaho Site Arimo resident Jeff Johnson did something this week he hasn�t done since January. He reported to his new job. Funding for Johnson�s position is part of the $468 million in additional funding that the U.S. Department of Energy�s (DOE) Idaho Site received under the American Recovery and Reinvestment Act. The additional funding will help accelerate work on both the Idaho Cleanup Project (ICP) and the Advanced Mixed Waste Treatment

  7. An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

    SciTech Connect (OSTI)

    Nenni, Joseph A.; Thompson, Theron J.

    2012-07-01

    The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability, maintainability, and inspectability analysis were incorporated into a time and motion model to validate and verify the capability to complete treatment of the calcine within the required schedule. The Calcine Disposition Project systems engineering approach, including use of industry-proven design-for-quality tools and quantitative assessment techniques, has strengthened the project's design capability to meet its intended mission in a safe, cost-effective, and timely manner. Use of these tools has been particularly helpful to the project in early design planning to manage variation; improve requirements and high-consequence risk management; and more effectively apply alternative, interface, failure mode, RAMI, and time and motion analyses at the earliest possible stages of design when their application is most efficient and cost effective. The project is using these tools to design and develop HIP treatment of highly radioactive calcine to produce a volume-reduced, monolithic waste form with immobilization of hazardous and radioactive constituents. (authors)

  8. Legacy Cleanup Completion Project

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Christine Gelles, Associate Deputy Assistant Secretary, Waste Management EM HQ.

  9. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  10. Idaho Site Contractor Achieves Treatment Project Milestone

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho The Idaho sites main cleanup contractor recently achieved a major performance milestone by successfully passing an operational readiness review for a first-of-a-kind facility that will treat the remaining 900,000 gallons of liquid radioactive waste generated by the sites legacy cleanup mission.

  11. Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – An innovative idea for cleaning up sodium in a decommissioned nuclear reactor at EM’s Idaho site grew from a carpool discussion.

  12. Idaho Site’s Cold War Cleanup Takes Center Stage in Publication

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – An association with more than 29,000 members featured an in-depth article on EM’s extensive Cold War legacy cleanup at the Idaho site in the current issue of its publication, The Military Engineer.

  13. A Decade of Cleanup Progress at EM's Idaho Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Decade of Cleanup Progress at EM's Idaho Site A Decade of Cleanup Progress at EM's Idaho Site July 29, 2015 - 12:00pm Addthis Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. Workers exhume targeted buried waste from Pit 9 in the Subsurface Disposal Area. Workers exhume targeted buried waste from Pit 9 in the Subsurface Disposal Area. An employee swipes a

  14. Second site-wide five-year review of cleanup at DOE?s Idaho...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOEs Idaho site...

  15. EIS-0506: Crooked River Valley Rehabilitation Project; Idaho County, Idaho

    Office of Environmental Management (EM)

    | Department of Energy 6: Crooked River Valley Rehabilitation Project; Idaho County, Idaho EIS-0506: Crooked River Valley Rehabilitation Project; Idaho County, Idaho SUMMARY The U.S. Forest Service, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, prepared an EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality

  16. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Office of Environmental Management (EM)

    October 6, 2011 Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago IDAHO FALLS, Idaho - From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first

  17. Agencies sign last record of decision for DOE Idaho cleanup program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agencies sign last record of decision for DOE Idaho cleanup program The U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency and the State of Idaho have signed the last of 25 Superfund records of decision (RODs) at DOE�s Idaho Site. These three agencies have been implementing an agreement to clean up the 890 square-mile, eastern Idaho site since 1991. Last year, the agencies completed a multi-year environmental study of the Snake River Plain Aquifer beneath the site

  18. DOE-Idaho Operations Office | Department of Energy

    Office of Environmental Management (EM)

    DOE-Idaho Operations Office DOE-Idaho Operations Office Offices in Idaho PDF icon DOE-Idaho Operations Office More Documents & Publications Idaho Cleanup Project CH2M-WG Idaho, LLC Bechtel BWXT Idaho, LLCAdvanced Mixed Waste Treatment Project Enforcement Letter, Bechtel BWXT Idaho, LLC - March 17, 2008

  19. Mission Need Statement: Idaho Spent Fuel Facility Project

    SciTech Connect (OSTI)

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  20. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Recovery Act cleanup Lab completes first Recovery Act cleanup project The $13 million project involved demolition of an 18,000-square-foot former nuclear fusion research facility. August 4, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits

  1. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon FY15 Budget Overview for Cleanup Caucus PDF icon Idaho Cleanup Project PDF icon Advanced Mixed Waste Treatment Project PDF icon Richland Operations Office Cleanup Strategy, Scope PDF icon Idaho Cleanup

  2. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon FY15 Budget Overview for Cleanup Caucus PDF icon Idaho Cleanup Project PDF icon Advanced Mixed Waste Treatment Project PDF icon Richland Operations Office Cleanup Strategy, Scope PDF icon Idaho Cleanup

  3. EM Cleanup Crew Nears Finish at Idaho Transuranic Waste Storage Facility |

    Office of Environmental Management (EM)

    Department of Energy Cleanup Crew Nears Finish at Idaho Transuranic Waste Storage Facility EM Cleanup Crew Nears Finish at Idaho Transuranic Waste Storage Facility October 29, 2015 - 12:25pm Addthis Workers stand atop newly placed drums and boxes of transuranic waste, circa. 1971. The drums and boxes would soon be covered with soil to form a protective berm. Workers stand atop newly placed drums and boxes of transuranic waste, circa. 1971. The drums and boxes would soon be covered with soil

  4. Idaho Site D&D Crew Uses Specialized Tools to Cut Apart Massive Tank in Demolition Project

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program and its main cleanup contractor at the Idaho site successfully tackled a formidable project by slicing a 48-foot-long, 103,000-pound steam drum tank into three manageable pieces for removal.

  5. WIPP - Idaho Impacts | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Jack Zimmerman, Deputy Manager for the Idaho Cleanup Project, DOE Idaho Operations Office. PDF icon WIPP - Idaho Impacts More Documents & Publications EIS-0200-SA-03: Supplement Analysis EIS-0026-S2: Final Supplemental Environmental Impact Statement How Does the WIPP Shutdown Impact New Mexico, Idaho, and South Carolina

  6. Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf |

    Energy Savers [EERE]

    Department of Energy Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf PDF icon Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 DOE EIR FM.doc External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010

  7. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

  8. DOE-Idaho Operations Summary For June 15 to July 5, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2010. Idaho Cleanup Project Nothing to report. Operational Summary Decontamination and Decommissioning Work: At the Idaho Nuclear Technology and Engineering Center, the last...

  9. Idaho's Advanced Mixed Waste Treatment Project Details 2013

    Office of Environmental Management (EM)

    Accomplishments | Department of Energy Idaho's Advanced Mixed Waste Treatment Project Details 2013 Accomplishments Idaho's Advanced Mixed Waste Treatment Project Details 2013 Accomplishments December 24, 2013 - 12:00pm Addthis IDAHO FALLS, Idaho - EM and its contractor, Idaho Treatment Group (ITG), safely and compliantly met all of their production and shipping targets in the Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho site in 2013. AMWTP's purpose is to safely process and

  10. Manhattan Project Truck Unearthed in Recovery Act Cleanup | Department of

    Office of Environmental Management (EM)

    Energy Manhattan Project Truck Unearthed in Recovery Act Cleanup Manhattan Project Truck Unearthed in Recovery Act Cleanup A Los Alamos National Laboratory (LANL) excavation crew working on an American Recovery and Reinvestment Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project landfill. The truck was unearthed inside a sealed building where digging is taking place at Material Disposal Area B (MDA-B), the Lab's first hazardous and

  11. Tritium research laboratory cleanup and transition project final report

    SciTech Connect (OSTI)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  12. Warehouse Cleanup Project Completed at DOE's Paducah Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Warehouse Cleanup Project Completed at DOE's Paducah Site Warehouse Cleanup Project Completed at DOE's Paducah Site January 27, 2015 - 3:06pm Addthis Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) A crane loads a high‐side railcar for transport to a commercial waste disposal facility after

  13. Wendy Cain named portfolio federal project director for ETTP cleanup |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Oak Ridge Office of Environmental Management (OREM) has named Wendy Cain as its new portfolio federal project director for cleanup of the East Tennessee Technology Park (ETTP). As the portfolio federal project director, Ms. Cain oversees all of the cleanup, demolition, waste disposal, and land transfers at the site. At the forefront, Cain is directing the removal of the K-31 and K-27 buildings, which are the final uranium enrichment facilities at ETTP. In this position,

  14. Idaho Site Closes Out Decontamination and Decommissioning Project...

    Office of Environmental Management (EM)

    Site Closes Out Decontamination and Decommissioning Project about 440 Million under Cost Idaho Site Closes Out Decontamination and Decommissioning Project about 440 Million under...

  15. Idaho National Laboratory (INL) Seismic Risk Assessment Project...

    Office of Environmental Management (EM)

    Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Idaho National Laboratory (INL) Seismic Risk Assessment Project: Implementation...

  16. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  17. Manhattan Project truck unearthed at landfill cleanup site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan project truck Manhattan Project truck unearthed at landfill cleanup site A LANL excavation crew working on a Recovery Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. April 8, 2011 image description Excavator operator Kevin Miller looks at the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. Contact Fred deSousa Communications Office (505) 665-3430 Email Remnants of a 1940s military truck

  18. 2012 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    three new members to advisory board 092712 New Video Puts INL Waste Inventories into Context 091212 DOE extends the Idaho Cleanup Project contract for three years 091012...

  19. Legacy Clean-up Completion Project Overview | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Bob Pfaff provided the members with information regarding the status of the Fiscal Year 2016 Budget request. Information included in the presentation also covered strategic planning and the remaining workscope in the Los Alamos National Laboratory Legacy Clean-up Project. PDF icon FY'16 Overview - July 29, 2015 More Documents & Publications Executing Legacy Clean-up at LANL NNMCAB Board Minutes: July 29, 2015 Taos Department of Energy Accomplishments

  20. WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE IDAHO SITE

    Broader source: Energy.gov [DOE]

    Idaho - The Waste Disposition Project Team at the Department of Energy’s Idaho Site has continued to keep its commitment to remove remote handled (RH) transuranic (TRU) waste out of Idaho, protecting the Snake River Plain Aquifer and keeping the Office of Environmental Management’s commitment to environmental clean up.

  1. EM Highlights Idaho Site's 2014 Accomplishments

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program at the Idaho site and its cleanup contractors ended 2014 with many accomplishments.

  2. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    Mutual GAC Granulated Activated Carbon HEPA High Efficiency Particulate Air HSS Office of Health, Safety and Security ICP Idaho Cleanup Project INL Idaho National Laboratory...

  3. DOE-Idaho Operations Summary For Dec. 9 to Dec. 21, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mexico for disposal. Idaho Cleanup Project No items to report. Operational Summary Buried Waste Excavation Activities: Construction of the Advanced Retrieval Project-IV, which will...

  4. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned Report, NNSA, Feb 2010 | Department of Energy Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 PDF icon 000466 Idaho Spent Fuel Facility (ISFF) Project Appropriate Acquisition Strategy Lessons Learned Report Feb 2011.pdf More Documents & Publications Integrated Biorefinery Research Facility (IBRF

  5. Department of Energy Idaho - Advanced Mixed Waste Treatment Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    > AMWTP Contract Idaho Treatment Group, LLC (ITG) Advanced Mixed Waste Treatment Project Contract Basic Contract Contract Modifications Last Updated: 10052015 Privacy Statement...

  6. DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone

    Broader source: Energy.gov [DOE]

    In a project sponsored by the U.S. Department of Energy (DOE), a demonstration-scale application of RTI International’s warm synthesis gas (syngas) cleanup process technology has achieved a key operational milestone at Tampa Electric Company’s coal gasification plant in Polk County, Fla.

  7. Idaho Petroleum Reduction Leadership Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon arravt041_ti_baird_2012_o.pdf More Documents & Publications Idaho Petroleum Reduction Leadership Project Idaho Petroleum Reduction Leadership Project Vehicle Technologies Office Merit Review 2014: Advancing New Mexico's Alternative Fuels

  8. Idaho Petroleum Reduction Leadership Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. PDF icon tiarravt041_baird_2010_p.pdf More Documents & Publications Idaho Petroleum Reduction Leadership Project Idaho Petroleum Reduction Leadership Project Utah Clean Cities Transportation Sector Petroleum Reduction Technologies Program

  9. Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup | Department

    Energy Savers [EERE]

    of Energy IDAHO FALLS, Idaho - Workers at the Idaho site have enlisted microbes to help remediate previously contaminated groundwater and advance the protection of the Snake River Plain Aquifer. The microbes in the aquifer are fed a mixture of sodium lactate and whey powder, a common ingredient found in sport protein drinks. "The microbes eat it, and in the process break down trichloroethylene (TCE). Although TCE is a carcinogen, the end products are harmless," said Lorie Cahn,

  10. Independent Oversight Activity Report, Idaho Cleanup Project – November 2013

    Broader source: Energy.gov [DOE]

    Pre-Restart Visit to the Integrated Waste Treatment Unit by the Defense Nuclear Facilities Safety Board [HIAR-ICP-2013-11-19

  11. DOE extends the Idaho Cleanup Project contract for three years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    [NEWS/PressReleases/PR120926-ICP/120926.htm]

  12. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War

  13. DOE-Idaho Operations Summary For March 19, 2013 to April 3, 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste were made from Idaho to the Waste Isolation Pilot Plant in New Mexico for the week ending March 23, 2013. Idaho Cleanup Project March 21: A manager at...

  14. DOE-Idaho Operations Summary For June 28 to July 18, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste have been shipped from Idaho to the Waste Isolation Pilot Plant in New Mexico for disposal. Idaho Cleanup Project July 12: As part of a routine safety review, it...

  15. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Broader source: Energy.gov [DOE]

    From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National...

  16. Idaho Petroleum Reduction Leadership Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon arravt041_es_baird_2011_p.pdf More Documents & Publications Idaho Petroleum Reduction Leadership Project Idaho Petroleum Reduction Leadership Project North Central Texas Council of Governments’ North Central Texas Alternative Fuel and Advanced Technology Investments initiative is one of 25 Area of Interest 4 Selections

  17. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty...

    National Nuclear Security Administration (NNSA)

    Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  18. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project...

    National Nuclear Security Administration (NNSA)

    Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  19. Bill McMillan named federal project director for ORNL cleanup | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Bill McMillan named federal project director for ORNL cleanup Bill McMillan named federal project director for ORNL cleanup September 20, 2012 - 12:00pm Addthis OAK RIDGE, Tenn. - The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has named Bill McMillan as its new federal project director for cleanup at the Oak Ridge National Laboratory (ORNL). As federal project director, McMillan oversees all cleanup, decontamination, decommissioning, waste storage

  20. CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS Aiken, SC - Construction of a key cleanup facility at the Savannah River Site (SRS) is gaining some serious ground given the remarkable building progress since Fall 2009. Construction and operation of the Salt Waste Processing Facility (SWPF) is among the U.S. Department

  1. Idaho National Laboratory (INL) Seismic Risk Assessment Project:

    Office of Environmental Management (EM)

    Implementation of Proposed Methodology at INL and Associated Risk Studies | Department of Energy Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Idaho National Laboratory (INL) Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL and Associated Risk Studies Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. PDF icon INL Seismic Risk Assessment Project: Implementation of Proposed Methodology at INL

  2. CRAD, Quality Assurance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho Accelerated Retrieval Project Phase II.

  3. CRAD, Criticality Safety- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Criticality Safety program at the Idaho Accelerated Retrieval Project Phase II.

  4. CRAD, Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Management at the Idaho Accelerated Retrieval Project Phase II.

  5. CRAD, Emergency Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho Accelerated Retrieval Project Phase II.

  6. CRAD, Fire Protection- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Fire Protection program at the Idaho Accelerated Retrieval Project Phase II.

  7. CRAD, Training- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Training Program at the Idaho Accelerated Retrieval Project Phase II.

  8. CRAD, Safety Basis- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Safety Basis at the Idaho Accelerated Retrieval Project Phase II.

  9. CRAD, Radiological Controls- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Radiation Protection Program at the Idaho Accelerated Retrieval Project Phase II.

  10. CRAD, Engineering- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Engineering program at the Idaho Accelerated Retrieval Project Phase II.

  11. CRAD, Conduct of Operations- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February, 2006 Commencement of Operations assessment of the Conduct of Operations program at the Idaho Accelerated Retrieval Project Phase II.

  12. CRAD, Occupational Safety & Health- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Occupational Safety and Industrial Hygiene Program at the Idaho Accelerated Retrieval Project Phase II.

  13. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  14. DOE Announces Start of Recovery Act Funded Cleanup Projects at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office announced that cleanup of the Old Salvage Yard at the Y-12 National Security Complex, has started with funding received from the American Recovery and Reinvestment Act...

  15. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War Open full screen to view more You are...

  16. 2014 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current 2014 12/23/14 DOE Issues Draft RFP for Idaho Cleanup Project Core 12/22/14 INL Site EM Citizens Advisory Board Celebrates 20th Anniversary 11/17/14 Agencies announce third site-wide five-year review of cleanup at DOE's Idaho Site 09/22/14 DOE issues Finding of No Significant Impact on the Disposition of Five Signature Properties at Idaho National Laboratory 07/17/14 Office of Environmental Management Completes Idaho Site Sludge-Drum Waste Treatment Project 06/03/14 Office of

  17. EIS-0136: Special Isotope Separation Project Idaho National Engineering Laboratory, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to provide environmental input to the decision to construct the Special Isotope Separation Project, which would allow for the processing of existing fuel-grade plutonium into weapons-grade plutonium using the Atomic Laser Isotope Separation process.

  18. PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 Paducah site uses in-ground heating to remove groundwater contamination Paducah site uses in-ground heating to remove groundwater contamination Read more Portsmouth Site shipped plant components to an approved offsite disposal facility Portsmouth Site shipped plant components to an approved offsite disposal facility Read more DUF6 Project converts DUF6 into a more stable

  19. DOE-Idaho Operations Summary For April 11 to April 25, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11 to April 25, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  20. DOE-Idaho Operations Summary For April 20 to May 5, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 to May 5, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  1. DOE-Idaho Operations Summary For April 25 to May 14, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 to May 14, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  2. DOE-Idaho Operations Summary For April 26 to May 16, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 to May 16, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  3. DOE-Idaho Operations Summary For August 22 to September 10, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22 to Sept. 10, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  4. DOE-Idaho Operations Summary For August 24 to September 12, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 to September 12, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  5. DOE-Idaho Operations Summary For August 27 to September 13, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    27 to September 13, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  6. DOE-Idaho Operations Summary For August 3 to August 16, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 to August 16, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  7. DOE-Idaho Operations Summary For August 3 to August 21, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 to Aug. 21, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  8. DOE-Idaho Operations Summary For August 9 to August 23, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 to August 23, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  9. DOE-Idaho Operations Summary For Dec. 22, 2009 to Jan. 4, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22, 2009 to Jan. 4, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  10. DOE-Idaho Operations Summary For December 11, 2012 to January 2, 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11, 2012 to Jan. 2, 2013 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  11. DOE-Idaho Operations Summary For December 27, 2011 to January 23, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2011 to January 23, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL).

  12. DOE-Idaho Operations Summary For Feb. 22 to March 8, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22 to March 8, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  13. DOE-Idaho Operations Summary For Feb. 3 to Feb. 22, 2010*

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feb. 3 to Feb. 22, 2010* EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  14. DOE-Idaho Operations Summary For February 12, 2013 to February 25, 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2013 to Feb. 25, 2013 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  15. DOE-Idaho Operations Summary For February 15 to March 7, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 to March 7, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  16. DOE-Idaho Operations Summary For February 7 to February 27, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2012 to February 27, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL).

  17. DOE-Idaho Operations Summary For Jan. 19 to Feb. 2, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 to Feb. 2, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  18. DOE-Idaho Operations Summary For Jan. 5 to Jan. 18, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 to Jan. 18, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  19. DOE-Idaho Operations Summary For January 1, 2013 to January 28, 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2013 to Jan. 28, 2013 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  20. DOE-Idaho Operations Summary For January 24, 2012 to February 6, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 24, 2012 to February 6, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory

  1. DOE-Idaho Operations Summary For January 29, 2013 to February 11, 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29, 2013 to Feb. 11, 2013 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  2. DOE-Idaho Operations Summary For July 13 to August 2, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 13 to Aug. 2, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  3. DOE-Idaho Operations Summary For July 19 to August 8, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 to August 8, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  4. DOE-Idaho Operations Summary For July 20 to August 2, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 to August 2, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  5. DOE-Idaho Operations Summary For July 6 to July 19, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 to July 19, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  6. DOE-Idaho Operations Summary For July 7 to July 20, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 to July 20, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  7. DOE-Idaho Operations Summary For June 5 to June 18, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 to June 18, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  8. DOE-Idaho Operations Summary For June 7 to June 27, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 to June 27, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  9. DOE-Idaho Operations Summary For March 22 to April 5, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 to April 5, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  10. DOE-Idaho Operations Summary For March 28 to April 24, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28 to April 24, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  11. DOE-Idaho Operations Summary For March 8 to April 11, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 11, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  12. DOE-Idaho Operations Summary For May 12 to May 25, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 to May 25, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  13. DOE-Idaho Operations Summary For May 15 to June 4, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 to June 4, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  14. DOE-Idaho Operations Summary For May 17 to June 6, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 to June 6, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  15. DOE-Idaho Operations Summary For May 25 to June 14, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 to June 14, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  16. DOE-Idaho Operations Summary For Nov. 10 to Nov. 23, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nov. 10 to Nov. 23, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  17. DOE-Idaho Operations Summary For Nov. 24 to Dec. 8, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nov. 24 to Dec. 8, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  18. DOE-Idaho Operations Summary For November 13 to December 10, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 to Dec. 10, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  19. DOE-Idaho Operations Summary For November 15 to December 1, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 to December 1, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  20. DOE-Idaho Operations Summary For November 2 to November 14, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 to November 14, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  1. DOE-Idaho Operations Summary For November 29 to December 26, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 to December 26, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  2. DOE-Idaho Operations Summary For November 8 to November 28, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 to November 28, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  3. DOE-Idaho Operations Summary For October 18 to November 7, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 to November 7, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  4. DOE-Idaho Operations Summary For October 19 to November 1, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 to November 1, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  5. DOE-Idaho Operations Summary For October 23 to November 12, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 to Nov. 12, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary

  6. DOE-Idaho Operations Summary For Sept. 15 to Sept. 28, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 to Sept. 28, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  7. DOE-Idaho Operations Summary For Sept. 29 to Oct. 12, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29 to Oct. 12, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  8. DOE-Idaho Operations Summary For September 10 to October 1, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 to to Oct. 1, 2012 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  9. DOE-Idaho Operations Summary For September 14 to September 27, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 to September 27, 2010 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  10. DOE-Idaho Operations Summary For September 27 to October 17, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 to October 17, 2011 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This

  11. Idaho Waste Vitrification Facilities Project Vitrified Waste Interim Storage Facility

    SciTech Connect (OSTI)

    Bonnema, Bruce Edward

    2001-09-01

    This feasibility study report presents a draft design of the Vitrified Waste Interim Storage Facility (VWISF), which is one of three subprojects of the Idaho Waste Vitrification Facilities (IWVF) project. The primary goal of the IWVF project is to design and construct a treatment process system that will vitrify the sodium-bearing waste (SBW) to a final waste form. The project will consist of three subprojects that include the Waste Collection Tanks Facility, the Waste Vitrification Facility (WVF), and the VWISF. The Waste Collection Tanks Facility will provide for waste collection, feed mixing, and surge storage for SBW and newly generated liquid waste from ongoing operations at the Idaho Nuclear Technology and Engineering Center. The WVF will contain the vitrification process that will mix the waste with glass-forming chemicals or frit and turn the waste into glass. The VWISF will provide a shielded storage facility for the glass until the waste can be disposed at either the Waste Isolation Pilot Plant as mixed transuranic waste or at the future national geological repository as high-level waste glass, pending the outcome of a Waste Incidental to Reprocessing determination, which is currently in progress. A secondary goal is to provide a facility that can be easily modified later to accommodate storage of the vitrified high-level waste calcine. The objective of this study was to determine the feasibility of the VWISF, which would be constructed in compliance with applicable federal, state, and local laws. This project supports the Department of Energys Environmental Management missions of safely storing and treating radioactive wastes as well as meeting Federal Facility Compliance commitments made to the State of Idaho.

  12. New Generation Dresden NPP Demineralizer Vault Cleanup Project

    SciTech Connect (OSTI)

    Denton, M.S.; CET, Ph.D.; Forrester, K.; Azar, M.

    2008-07-01

    Electro-coagulation (EC) is a technique that facilitates rapid destabilization and flocculation of colloidal suspensions to cause the suspended solids to separate from slurry phase. It is generally accepted that coagulation is brought about primarily by the reduction of the net surface charge to a point where the colloidal particles, previously stabilized by electrostatic repulsion, can approach closely enough for van der Waals forces to hold them together and allow aggregation. In the EC process, the coagulant is generated in situ by electrolytic oxidation of an appropriate anode material (aluminum in this case). In this process, charged ionic species, metals or otherwise, and suspended solids are removed from wastewater by allowing them to interact with an ion having opposite charge, or with floc of metallic hydroxides generated electrochemically within the effluent. Typically, no supplementary organic polymer coagulant addition is required. Thus, electro-coagulation (EC) was found to be an attractive treatment option to rapidly destabilize the colloidal particulate phase, allowing more facile particulate removal by decantation and/or coarse filtration. However, the liquid medium must have some conductivity (> 100 {mu}mho is preferred), in order to allow effective electrical coupling with the EC electrodes. A very small amount of aluminum or sodium sulfate salts can be added to the feed slurry, adjusting the water quality parameters to a conductivity of >100 {mu}mho and a pH value near 6.0-7.0. The EC-treated vault slurry had a pH value near 6.5 (within the pH range for minimal solubility of amphoteric aluminum hydroxide). In contrast to untreated wastewater, the agglomerated particles in the EC-treated aliquot could be filtered relatively rapidly, yielding a clear filtrate, indicating that the flocs that have been formed are now > 20- {mu}m in size, are pumpable (high shear strength), and filterable/dewaterable with ease (low water content). Final waste volumes also show that the actual volumetric fraction of solids produced are relatively small. In order to estimate the amount of material (Al or Fe depending on the electrode material) added by the EC process, a rough rule of thumb has been found to be {approx}15 ppm per amp-minute. It was found with most wastewaters that Cs seeding (if that step is required) added {approx} 100 ppm Cs Seed and 10-15 ppm/amp minute additional floc from the electrodes. In a typical BWR wastewater case, where the TSS represented {<=} 0.15 wt% ({approx}1500 ppm). At 1.5 amp-min., the Al (III) added by the EC process would be {approx} 20 ppm, or {approx} 60 ppm as Al(OH){sub 3}. It was found the relatively low floc [{approx} 40 ppm as dried Al(OH){sub 3}] worked quite well for the high colloid level present ({approx}1500 ppm), and would be even more enhanced with the use of recycle. Even at that relatively low treatment dose, the colloidal TSS in the wastewater was effectively flocculated to yield agglomerates that were easily filtered and dewatered. Another rule of thumb is that, empirically, TDS (in mg/l) is typically {approx}0.5 X conductivity (in umho/cm). For instance, a conductivity reading of 100 umho/cm corresponds to about 50 ppm of TDS. As can be seen, the amount of material actually added in this vault cleanup of {approx}15 ppm per amp-min compared to the existing {approx}1500 ppm of TDS present (0.5 X conductivity of 3000 {mu}mho/cm) is minimal. In this vault cleanup, as a precautionary measure, the HIC was a specially designed Press-Pak with internal sheet filters, final dewatering leg, and a expandable, outer bladder if needed for final dewatering. It was found after filling the first HIC, of two, that the material dewatered and passed final dewatering tests without the need for the precautionary Press-Pak feature. Original estimates by the evaluation team estimated it would take some 11 to 12 HICs to remove the vault contents to a remote location for treatment, dewatering and final shipment. With the use of the SAFE{sup TM} Solution, the project was completed dur

  13. Idaho National Laboratory receives national recognition for Small Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentoring Program Media contacts: Erik Simpson (208) 360-0426 Idaho National Laboratory receives national recognition for Small Business Mentoring Program With the help of American Recovery and Reinvestment Act funds, the Idaho Cleanup Project continues work to protect the Snake River Plain Aquifer this week by injecting grout into 21 buried waste locations in the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Department of Energy�s Idaho Site. The

  14. Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)

    Broader source: Energy.gov [DOE]

    Argonne National Laboratory-West, Former Production Workers Screening Projects (now known as the Idaho National Laboratory)

  15. EA-1050: Test Area North Pool Stabilization Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Idaho National Engineering Laboratory's proposal to remove 344 canisters of Three Mile Island core debris and...

  16. DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a contract to Enviro Compliance Solutions Inc. of Tustin, California to perform environmental sampling, monitoring services and analysis of ongoing cleanup activities being performed at the West Valley Demonstration Project in western New York.

  17. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  18. Idaho Completion Projects Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect (OSTI)

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  19. Wildlife Impact Assessment Palisades Project, Idaho, Final Report.

    SciTech Connect (OSTI)

    Sather-Blair, Signe

    1985-02-01

    The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

  20. Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project

    Broader source: Energy.gov [DOE]

    BERKELEY, Calif. – Lawrence Berkeley National Laboratory authorized this month a small business joint venture to begin a deactivation and demolition project in an area here known as Old Town.

  1. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project.

  2. DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mixed Waste Treatment Project Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Friday, May 27, 2011 DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced Mixed Waste Treatment Project Contract will continue cleanup and waste operations at the Idaho Site Idaho Falls � In order to further meet the U.S. Department of Energy�s commitments to the citizens of the state of Idaho, the DOE today announced that it has selected Idaho Treatment Group, LLC (ITG)

  3. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup

    Office of Environmental Management (EM)

    14, 2012 AIKEN, S.C. - American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Coun- ties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned

  4. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era

    National Nuclear Security Administration (NNSA)

    Building | National Nuclear Security Administration Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony

  5. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets

  6. Finding of no significant impact for the interim action for cleanup of Pit 9 at the Radioactive Waste Management Complex, Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0854, for an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The proposed action would be conducted at Pit 9, Operable Unit 7--10, located at the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The proposed action consists of construction of retrieval and processing buildings, excavation and retrieval of wastes from Pit 9, selective physical separation and chemical extraction, and stabilization of wastes either through thermal processing or by forming a stabilized concentrate. The proposed action would involve limited waste treatment process testing and full-scale waste treatment processing for cleaning up pre-1970 Transuranic (TRU) wastes in Pit 9. The purpose of this interim action is to expedite the overall cleanup at the RWMC and to reduce the risks associated with potential migration of Pit 9 wastes to the Snake River Plain Aquifer.

  7. DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations |

    Energy Savers [EERE]

    Department of Energy M-Washington Group Idaho for Price-Anderson Violations DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations June 14, 2007 - 1:40pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today notified CH2M-Washington Group Idaho (CWI) that it will fine the company $55,000 for violations of the Department's nuclear safety requirements. CWI is the prime contractor responsible for managing the Idaho Cleanup Project at the Idaho National Laboratory site.

  8. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOEs Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  9. Public comment sought on soil cleanup project at the Idaho Site?s...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    until 2007, the pond received treated sanitary wastewater, low-level radioactive wastewater, and cold process water. Because of the low levels of soil contamination the...

  10. Idaho - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  11. Idaho - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  12. Idaho - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Idaho

  13. Electrical Safety Investment Safeguards Employees at Large Idaho Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho Site’s main cleanup contractor is using a $1.8 million DOE investment to safeguard employees from the threat of second- and third-degree electrical arc flash burns.

  14. 2013 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 11/12/13 Public invited to comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials 10/25/13 Bill Gates visit to Idaho validates innovation role for national laboratories 10/17/13 Next-generation nuclear fuel withstands high-temperature accident conditions 07/11/13 Process Improvements at AMWTP Will Lead to Safer, Less Expensive Processing of Radioactive Waste at DOE's Idaho Site 06/27/13 Important Cleanup Project To Resume At Idaho

  15. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    SciTech Connect (OSTI)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  16. An innovative approach to multimedia waste reduction: Measuring performance for environmental cleanup projects

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.; George, S.M.

    1993-04-01

    One of the greatest challenges we now face in environmental cleanup is measuring the progress of minimizing multimedia transfer releases and achieving waste reduction. Briefly, multimedia transfer refers to the air, land, and water where pollution is not controlled, concentrated, and moved from one medium to another. An example of multimedia transfer would be heavy metals in wastewater sludges moved from water to land disposal. Over $2 billion has been budgeted for environmental restoration site cleanups by the Department of Energy (DOE) for FY 1994. Unless we reduce the huge waste volumes projected to be generated in the near future, then we will devote more and more resources to the management and disposal of these wastes. To meet this challenge, the Martin Marietta Energy Systems, Inc., Oak Ridge Environmental Restoration (ER) Program has explored the value of a multimedia approach by designing an innovative Pollution Prevention Life-Cycle Model. The model consists of several fundamental elements (Fig. 1) and addresses the two major objectives of data gathering and establishing performance measures. Because the majority of projects are in the remedial investigation phase, the focus is on the prevention of unnecessary generation of investigation-derived waste and multimedia transfers at the source. A state-of-the-art tool developed to support the life-cycle model for meeting these objectives is the Numerical Scoring System (NSS), which is a computerized, user-friendly data base system for information management, designed to measure the effectiveness of pollution prevention activities in each phase of the ER Program. This report contains a discussion of the development of the Pollution Prevention Life-Cycle Model and the role the NSS will play in the pollution prevention programs in the remedial investigation phase of the ER Program at facilities managed by Energy Systems for DOE.

  17. Grouting project to protect Snake River Plain Aquifer completed ahead of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    schedule DOE Awards Small Business Contracts for Recovery Act Cleanup Work at DOE�s Idaho Site September 29, 2010 Media contact: Erik Simpson (208) 360-0426 Idaho Falls, ID � The Idaho Cleanup Project safely completed a remedial action five weeks ahead of schedule that protects the Snake River Plain Aquifer by grouting buried waste at the U.S. Department of Energy�s (DOE) Idaho Site. The American Recovery and Reinvestment Act funded the project. Project contractor Hayward Baker, Inc.,

  18. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental...

  19. Coeur dAlene Tribe Energy Efficiency and Conservation Block Grant Project, Plummer, Idaho

    Office of Environmental Management (EM)

    Stacey J. Fox, Environmental Planner, Coeur d'Alene Tribe Natural Resource Department, Environmental Programs Office, Plummer, Idaho Presentation Outline - Coeur d'Alene Tribe Background - History of the Tribal Natural Resource Department - Energy Work Prior to the EECBG - EECBG Project Objectives - Progress-to-Date - Lessons Learned - Examples of EECBG Energy Audit Report Findings - New Energy Efficiency Feasibility Study Objectives - Contact Information Coeur d'Alene Tribe Background - The

  20. DOE Selects Contractor for California Energy Technology Engineering Center Cleanup

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a competitive $25.7 million task order for cleanup activities at the Energy Technology Engineering Center (ETEC) to North Wind of Idaho Falls, Idaho.

  1. DOE National Cleanup Workshops

    Broader source: Energy.gov [DOE]

    DOE, in cooperation with the Energy Communities Alliance and the Energy Facility Contractors Group, held the first DOE National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EMs progress in the cleanup of the environmental legacy of the nations Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  2. National Cleanup Workshops

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA), in cooperation with the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG), held the first National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM’s progress in the cleanup of the environmental legacy of the nation’s Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  3. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect (OSTI)

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  4. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect (OSTI)

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  5. Department of Energy Idaho - Links

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ICP Idaho Completion Project INL Idaho National Laboratory Citizen's Advisory Board (CAB) Higher Education - INRA State & Local National Environmental Policy Act (NEPA) Office...

  6. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  7. Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Video Clips DOE-ID Press Releases and Video Clips Press Releases January - Current 2015 10/21/2015 DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed Facilities 09/29/15 DOE extends Advanced Mixed Waste Treatment Project contract 09/29/15 DOE extends Idaho Cleanup Project contract 06/08/15 Public invited to comment on Draft Supplement Analysis on Two Proposed Shipments of Commercial Nuclear Fuel to Idaho National Laboratory for Research and Development Purposes 03/16/15

  8. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    SciTech Connect (OSTI)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

  9. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    SciTech Connect (OSTI)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  10. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. To date, EM has made substantial progress in nearly every area of nuclear waste cleanup and completed cleanup at 91 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive

  11. Idaho Nuclear Technology and Engineering Center Newly Generated Liquid Waste Demonstration Project Feasibility Study

    SciTech Connect (OSTI)

    Herbst, A.K.

    2000-02-01

    A research, development, and demonstration project for the grouting of newly generated liquid waste (NGLW) at the Idaho Nuclear Technology and Engineering Center is considered feasible. NGLW is expected from process equipment waste, decontamination waste, analytical laboratory waste, fuel storage basin waste water, and high-level liquid waste evaporator condensate. The potential grouted waste would be classed as mixed low-level waste, stabilized and immobilized to meet RCRA LDR disposal in a grouting process in the CPP-604 facility, and then transported to the state.

  12. Cleanup 101

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup 101 Cleanup 101 The Compliance Order on Consent agreement with State of New Mexico dictates cleanup on an appropriate schedule. August 1, 2013 Workers sort through waste for processing at TA-21 Workers sort through waste for processing at TA-21 Historical operations discontinued in the Los Alamos townsite in the 1950s. 2,123 potential release sites (PRS) were investigated for possible cleanup. Sites ranged in size and severity from suspected quarts of oil to a 63-acre material disposal

  13. Summary - Idaho CERCLA Disposal Facility (ICDF) at Idaho National Laboratory

    Office of Environmental Management (EM)

    INL, Idaho EM Project: Idaho CERCLA Disposal Facility ETR Report Date: December 2007 ETR-10 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Idaho CERCLA Disposal Facility (ICDF) At Idaho National Laboratory (INL) Why DOE-EM Did This Review The Idaho CERCLA Disposal Facility (ICDF) is a land disposal facility that is used to dispose of LLW and MLW generated from remedial activities at the Idaho National Laboratory (INL). Components of

  14. Los Alamos Legacy Clean-up Completion Project Bridge Contract | Department

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Jack Craig DOE HQ, Provided Information on the Bridge Contract for the Shift from NNSA Oversight to EM Oversight for LANL Environmental Clean-up. PDF icon Bridge Contract - December 10, 2014 More Documents & Publications Los Alamos National Laboratory TRU Waste Update Accident Investigation Report - Radiological Release

  15. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building

    Broader source: Energy.gov [DOE]

    Beta 4, one of the oldest and largest buildings at the Y-12 National Security Complex, recently reached a significant cleanup milestone. The second floor of the building, more than 82,000 square feet, has been cleared of large equipment and waste from Cold War operations.

  16. 2014 Cleanup Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    96 Annual Report to the Oak Ridge Regional Community 2014 Cleanup Progress 2 1 Message from the EM Manager Department of Energy Oak Ridge Office To the Oak Ridge Regional Community: Reflecting on 2014, I am extremely proud of the Department of Energy (DOE) Oak Ridge Office's accomplishments. We completed the Department of Energy's larg- est-ever demolition project, transferred unneeded land to the community to bolster economic development opportunities, and progressed on cleanup projects at the

  17. EM Contractor’s Success in Addressing Challenging Waste Leads to More Cleanup Work

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program’s Idaho Site cleanup contractor CH2M-WG Idaho’s (CWI) success last year in treating and packaging 6,000 drums of radioactive and hazardous waste left over from the Cold War weapons program has spawned additional cleanup work for the company.

  18. Defense Secretary Awards EM Idaho Contractor Freedom Award at Pentagon

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – CH2M-WG Idaho (CWI), the main cleanup contractor for the EM program at the Idaho Operations Office, received the Secretary of Defense Employer Support Freedom Award at the Pentagon for its support of National Guard and Reserve employees.

  19. Third Buried Waste Retrieval Project under way at DOE Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    during nuclear weapons production activities in the 1960s and were packaged in drums and sent to Idaho for buried disposal. Targeted waste is being repackaged into...

  20. Agencies announce third site-wide five-year review of cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    five-year review of cleanup at the U.S. Department of Energy's Idaho Site. Five-year reviews evaluate the protectiveness of completed and ongoing cleanup actions as required...

  1. 2015 DOE National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    DOE, in cooperation with the Energy Communities Alliance and the Energy Facility Contractors Group, held the first DOE National Cleanup Workshop on Sept. 29 and 30, 2015 in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM’s progress in the cleanup of the environmental legacy of the nation’s Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  2. Boise, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Grid Project Registered Research Institutions in Boise, Idaho Boise State University, CAES Energy Efficiency Research Institute Registered Energy Companies in Boise, Idaho Inovus...

  3. Idaho Wind Energy | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Jump to: navigation, search Name: Idaho Wind Energy Place: Tetonia, Idaho Zip: 83452 Sector: Geothermal energy, Wind energy Product: A geothermal and wind project...

  4. DOE-Idaho Operations Summary For Aug. 18 to Aug. 31, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No incidents to report. Operational Summary Waste shipments: through Aug. 8, 2009, a total of 28,991 cubic meters of stored transuranic waste, 85.35 cubic meters of remote-handled transuranic waste and 1,221 cubic meters of previously buried transuranic waste have been shipped from Idaho to the Waste Isolation Pilot Plant in New Mexico for disposal. Idaho Cleanup Project Aug. 13: A front end loader moving soil inside the Advanced Retrieval Project-III facility hit the bucket of an excavator that

  5. DOE Honors Idaho Facility with Safety Award

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho Jack Zimmerman, DOE Idaho Operations Offices deputy manager for EM, presented the Departments Voluntary Protection Program (VPP) Star flag to Advanced Mixed Waste Treatment Project (AMWTP) employees this month.

  6. Idaho County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Grangeville, Idaho Kamiah, Idaho Kooskia, Idaho Riggins, Idaho Stites, Idaho White Bird, Idaho Retrieved from "http:en.openei.orgwindex.php?titleIdahoCounty,Idaho&oldid...

  7. EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

  8. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy for Environmental Management. "As the largest DOE ... liability into a community asset, completing the project ... providing access to a wealth of information and resources. ...

  9. Mission Need Statement for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Lisa Harvego

    2009-06-01

    The Idaho National Laboratory proposes to establish replacement remote-handled low-level waste disposal capability to meet Nuclear Energy and Naval Reactors mission-critical, remote-handled low-level waste disposal needs beyond planned cessation of existing disposal capability at the end of Fiscal Year 2015. Remote-handled low-level waste is generated from nuclear programs conducted at the Idaho National Laboratory, including spent nuclear fuel handling and operations at the Naval Reactors Facility and operations at the Advanced Test Reactor. Remote-handled low-level waste also will be generated by new programs and from segregation and treatment (as necessary) of remote-handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex. Replacement disposal capability must be in place by Fiscal Year 2016 to support uninterrupted Idaho operations. This mission need statement provides the basis for the laboratorys recommendation to the Department of Energy to proceed with establishing the replacement remote-handled low-level waste disposal capability, project assumptions and constraints, and preliminary cost and schedule information for developing the proposed capability. Without continued remote-handled low-level waste disposal capability, Department of Energy missions at the Idaho National Laboratory would be jeopardized, including operations at the Naval Reactors Facility that are critical to effective execution of the Naval Nuclear Propulsion Program and national security. Remote-handled low-level waste disposal capability is also critical to the Department of Energys ability to meet obligations with the State of Idaho.

  10. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling

    Broader source: Energy.gov [DOE]

    The Alpha 5 Legacy Material Disposition project at Y-12 recently celebrated the early completion of a significant project milestone. The fourth floor of Alpha 5 has been cleared of 5,430 containers of legacy materials, which includes any equipment and materials not bolted or secured to the facility.

  11. Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna

    Broader source: Energy.gov [DOE]

    VIENNA – The Moab Uranium Mill Tailings Remedial Action (UMTRA) Project has kept the United States at the forefront of characterization, remediation, and end-state reuse of uranium millsites around the world.

  12. Post Critical Decision-4 Mark Arenaz, Federal Project Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31, 2011 Lessons Learned from the In-Situ Grouting in the Subsurface Disposal Area Post Critical Decision-4 Mark Arenaz, Federal Project Director Summary Protection of the Snake River Plain Aquifer is a major driver for environmental remediation at the Department of Energy's (DOE) Idaho Site. In 2010, the Idaho Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished using

  13. Idaho Site Launches Corrective Actions Before Restarting Waste Treatment Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho The Idaho site and its cleanup contractor have launched a series of corrective actions they will complete before safely resuming startup operations at the Integrated Waste Treatment Unit (IWTU) following an incident in June that caused the new waste treatment facility to shut down.

  14. IDAHO BIODIESEL INFRASTRUCTURE PROJECT DOE'S INITIATIVE ON COOPERATIVE PROGRAMS WITH STATES FOR RESEARCH, DEVELOPMENT AND DEMONSTRATION GRANT NO. DE-FC36-02GO12021. Final report

    SciTech Connect (OSTI)

    CROCKETT, JOHN

    2006-12-31

    The Idaho Energy Division issued a Request for Proposal (RFP) on March 14, 2006, inviting qualified licensed fuel wholesalers, fuel retailers, and vehicle fleet operators to provide proposals to construct and/or install infrastructure for biodiesel utilization in Idaho. The intent was to improve the ability of private and/or non-Federal public entities in Idaho to store, transport, or offer for sale biodiesel within the state. The RFP provided up $100,000 for co-funding the projects with a minimum 50% cash cost match. Four contracts were subsequetnly awarded that resulted in three new bidodiesel storage facilities immediately serving about 45 fueling stations from Sandpoint to Boise. The project also attracted considerable media attention and Idaho became more knowledgeable about biodiesel.

  15. Here?s What?s Going On at DOE-Idaho

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    If you're interested in learning how cleanup of DOE's Idaho Site is progressing, the CAB meetings are excellent sources of information. DOE Idaho Sends First Offsite Waste to...

  16. Paducah Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Paducah Cleanup Progress Since 1990, DOE has invested $1.9 billion in successful Paducah site cleanup projects to protect human health and the environment. The Environmental Management (EM) cleanup mission will continue through GDP transition and decontamination and decommissioning. Significant Paducah Site Cleanup Progress since 1990: Paducah leanup Progress graphic Recent Progress A panoramic view of the east end of the C-410 complex shows a rainbow forming as sunlight passes through

  17. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Feature Stories community-environmentassetsimagesicon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past,...

  18. Upper Los Alamos Canyon Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory

  19. Microsoft Word - Transmittal of the Final Audit Report for the Idaho National Laboratory-Central Characterization Project A-09-

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17:UFC 2300.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 August 6, 2009 Mr. James Bearzi, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bldg. 1 Santa Fe, New Mexico 87505-6303 Subject: Final Audit Report for the Idaho National Laboratory/Central Characterization Project A-09-08 Dear Mr. Bearzi: As requested in your letter dated August 4, 2009, the Carlsbad Field Office withdraws the final audit report A-09-08

  20. A life-cycle model approach to multimedia waste reduction measuring performance for environmental cleanup projects

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.; George, S.M.

    1993-07-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program`s mission is to minimize waste and prevent pollution in remedial investigations (RIs), feasibility studies, decontamination and decommissioning, and surveillance and maintenance site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. The ER Program waste generation rates are projected to steadily increase through the year 2005 for all waste categories. Standard production units utilized to measure waste minimization apply to production/manufacturing facilities. Since ER inherited contaminated waste from previous production processes, no historical production data can be applied. Therefore, a more accurate measure for pollution prevention was identified as a need for the ER Program. The Energy Systems ER Program adopted a life-cycle model approach and implemented the concept of numerically scoring their waste generators to measure the effectiveness of pollution prevention/waste minimization programs and elected to develop a numerical scoring system (NSS) to accomplish these measurements. The prototype NSS, a computerized, user-friendly information management database system, was designed to be utilized in each phase of the ER Program. The NSS was designed to measure a generator`s success in incorporating pollution prevention in their work plans and reducing investigation-derived waste (IDW) during RIs. Energy Systems is producing a fully developed NSS and actually scoring the generators of IDW at six ER Program sites. Once RI waste generators are scored utilizing the NSS, the numerical scores are distributed into six performance categories: training, self-assessment, field implementation, documentation, technology transfer, and planning.

  1. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    SciTech Connect (OSTI)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  2. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect (OSTI)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  3. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect (OSTI)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  4. EA-1901: Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE’s Bonneville Power Administration to support the Kootenai Tribe of Idaho’s construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort.

  5. 2010 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 12/22/10 Idaho National Laboratory Stand-Off Experiment Range draft environmental assessment available for public review and comment 11/30/10 PIT 9: From "Black Eye" to Part of DOE Cleanup Success 10/19/10 GreenGov Presidential Award 10/14/10 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Radiological Response Training Range 10/08/10 WIPP receives 9,000th shipment 09/30/10 Grouting project to protect Snake River Plain Aquifer completed ahead of

  6. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy from the 2015 DOE National Cleanup Workshop by Scott Sax, President, Washington Closure Hanford. PDF icon Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012

  7. East Tennessee Technology Park Cleanup | Department of Energy

    Office of Environmental Management (EM)

    Cleanup East Tennessee Technology Park Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the East Tennessee Technology Park. Projects include: K-1070-A and B Burial Ground Depleted Uranium Hexafluoride Container Removal Scrap Removal Project Ponds Remediation Groundwater Treatability Study Buildings K-25, K-27, K-29, K-31, and K-33 PDF icon ETTP cleanup fact sheet More Documents &

  8. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  9. Categorical Exclusion Determinations: Idaho Operations Office | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Idaho Operations Office Categorical Exclusion Determinations: Idaho Operations Office Categorical Exclusion Determinations issued by Idaho Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD March 24, 2014 CX-012097: Categorical Exclusion Determination Microgrid Demonstration Project CX(s) Applied: B5.15 Date: 03/24/2014 Location(s): Idaho Offices(s): Idaho Operations Office January 22, 2014 CX-011843: Categorical Exclusion Determination Enhanced Shielding Performance of High Level

  10. 2012 Annual Planning Summary for Idaho Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idaho Operations Office 2012 Annual Planning Summary for Idaho Operations Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Idaho Operations Office. PDF icon APS-2012-ID.pdf More Documents & Publications 2011 Annual Planning Summary for Idaho Operations Office (ID) 2010 Annual Planning Summary for Idaho Operations Office (ID

  11. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2010 SUBJECT: Release of the Finding of No Significant Impact and the Final Enviromnental Assessment for the MUltipurpose Haul Road Within the Idaho National Laboratory Site Dear Citizen: Thank you for your interest in the Finding of No Significant Impact (FONSI) and the Final Enviromnental Assessment (EA) for the Multipurpose Haul Road Within the Idaho National Laboratory Site (enclosed). All comments on this project and the potential enviromnental impacts have been addressed and the

  12. Accelerating cleanup: Paths to closure

    SciTech Connect (OSTI)

    1998-06-01

    This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

  13. Oak Ridge National Laboratory Cleanup | Department of Energy

    Energy Savers [EERE]

    Oak Ridge National Laboratory Cleanup Oak Ridge National Laboratory Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the Oak Ridge National Laboratory. This document dicusses the following projects: Tank W-1A Removal Action Project Building 3026 Hot Cells Facility Non-Reactor Facilities Removal Action 2000 Complex D&D Project Bethel Valley Burial Grounds Project U-233 Material

  14. Microsoft Word - California_cleanup.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Completes California Sites Cleanup CARLSBAD, N.M., June 14, 2010 - The U.S. Department of Energy's Carlsbad Field Office (CBFO) has successfully completed its campaign to clean up all defense- related transuranic (TRU) waste at California's Vallecitos Nuclear Center (VNC) near Sunol and Lawrence Livermore National Laboratory (LLNL) Site 300, east of Livermore. The last shipment of defense related TRU waste from VNC was shipped to Idaho National Laboratory on June 7. Following the

  15. Idaho National Laboratory - WAG-7 | Department of Energy

    Office of Environmental Management (EM)

    Idaho National Laboratory - WAG-7 Idaho National Laboratory - WAG-7 January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Idaho National Laboratory, ID Responsible DOE Office: Office of Nuclear Energy Plume Name: WAG-7 Remediation Contractor: CWI PBS Number: 30 Report Last Updated: 2014 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup Requirement CCI4 5.43 Yes 5

  16. Idaho Operations Office: Technology summary, June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  17. Pit 9 Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 11, 2007 Pit 9 Project Structures Removed For many years, the Pit 9 project at the Department of Energy's Idaho Site was the symbol of frustration for its cleanup program. All of that is coming to a close now, however, as North Wind, Inc. and its subcontractors are successfully tearing down and removing the structures and equipment left over by the original subcontractor for the Pit 9 project. The goal of this dismantlement and disposal project is to remove buildings and equipment to allow

  18. Idaho IFPTE

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory’s (INL) mission is to ensure the nation’s energy security with safe, competitive, and sustainable energy systems and unique national and homeland security capabilities. To...

  19. 2013 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 04/24/2013 - FY14 Budget Overview for Clean Up Caucus PDF icon 05/07/2013 - Office of River Protection PDF icon 05/16/2013 - Oak Ridge Congressional Nuclear Cleanup Caucus PDF icon 05/21/2013 -

  20. 2013 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 04/24/2013 - FY14 Budget Overview for Clean Up Caucus PDF icon 05/07/2013 - Office of River Protection PDF icon 05/16/2013 - Oak Ridge Congressional Nuclear Cleanup Caucus PDF icon 05/21/2013 -

  1. Idaho Crews Overcome Challenges to Safely Dispose 1-Million-Pound Hot Cell

    Office of Environmental Management (EM)

    Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ EM Recovery NEWS FLASH RECOVERY.GOV ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF November 9, 2011 Idaho Crews Overcome Challenges to Safely Dispose 1-Million-Pound Hot Cell IDAHO FALLS, Idaho - American Recovery and Reinvestment Act cleanup crews at the Idaho site recently

  2. Environmental Cleanup Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Audit of Moab Mill Tailings Cleanup Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah...

  3. DOE Awards Small Business Contracts for Recovery Act Cleanup Work at

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE�s Idaho Site DOE Awards Small Business Contracts for Recovery Act Cleanup Work at DOE�s Idaho Site August 2, 2010 Media contact: Brad Bugger, (208) 526-0833 Cincinnati � The Department of Energy Office of Environmental Management (EM) has awarded two small business contracts for work at the Department of Energy�s Idaho Site funded under the American Recovery and Reinvestment Act. North Wind Services, LLC, Idaho Falls, Idaho, was awarded a $14 million construction contract and

  4. Environmental Cleanup Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Reports Environmental Cleanup Reports June 2, 2015 Audit Report: DOE/IG-0937 The Status of Cleanup at the Department of Energy's Paducah Site September 18, 2014 Audit Report: OAS-M-14-11 Follow-Up on the Management of the Plutonium Finishing Plant Project September 26, 2013 Audit Report: OAS-L-13-15 The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory August 8, 2013 Audit Report: OAS-M-13-03 Cost Transfers at the Department's

  5. Search for: All records | SciTech Connect

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Idaho Cleanup Project (United States) Idaho National Laboratory Specific Manufacturing Plant Idaho National Laboratory, Idaho Falls, ID (United States) Idaho Operations...

  6. 2013 Annual Planning Summary for the Idaho Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Idaho Operations Office.

  7. Bonneville County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Inc Places in Bonneville County, Idaho Ammon, Idaho Idaho Falls, Idaho Iona, Idaho Irwin, Idaho Ririe, Idaho Swan Valley, Idaho Ucon, Idaho Retrieved from "http:...

  8. Bonner County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype B. Places in Bonner County, Idaho Clark Fork, Idaho Dover, Idaho East Hope, Idaho Hope, Idaho Kootenai, Idaho Oldtown, Idaho Ponderay, Idaho Priest River, Idaho...

  9. Bannock County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    B. Places in Bannock County, Idaho Arimo, Idaho Chubbuck, Idaho Downey, Idaho Fort Hall, Idaho Inkom, Idaho Lava Hot Springs, Idaho McCammon, Idaho Pocatello, Idaho Retrieved...

  10. Canyon County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    B. Places in Canyon County, Idaho Caldwell, Idaho Greenleaf, Idaho Melba, Idaho Middleton, Idaho Nampa, Idaho Notus, Idaho Parma, Idaho Wilder, Idaho Retrieved from "http:...

  11. Water Integration Project Science Strategies White Paper

    SciTech Connect (OSTI)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  12. Environmental Cleanup and Remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup /environment/_assets/images/icon_earthday.jpg Environmental Cleanup: Cleaning the Past Our goal is to clean up legacy waste sites and contaminated areas to protect human health and the environment, now and for years to come. WIPP Accident Investigation Board Report» Feature Stories» What We Clean Up & Why» TOP STORIES - highlights of our science, people, technologies close Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace To reduce its

  13. 2011 Annual Planning Summary for Idaho Operations Office (ID) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Idaho Operations Office (ID) 2011 Annual Planning Summary for Idaho Operations Office (ID) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management). PDF icon 2011 Annual Planning Summary for Idaho Operations Office (ID) More Documents & Publications 2010 Annual Planning Summary for Idaho Operations Office (ID) 2012 Annual Planning Summary for SLAC Site Office

  14. Idaho Geological Survey and University of Idaho Explore for Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Geological Survey and University of Idaho Explore for Geothermal Energy Idaho Geological Survey and University of Idaho Explore for Geothermal Energy January 11, 2013 -...

  15. Idaho - Idaho Dept. of Lands - Application for Easement | Open...

    Open Energy Info (EERE)

    Easement. Boise, Idaho. Idaho Department of Lands. Easement Application Instructions; 4p. Retrieved from "http:en.openei.orgwindex.php?titleIdaho-IdahoDept.ofLands-A...

  16. EM Contractor’s Role in Energy-Conservation Challenge Pays Off for Idaho Site

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – A challenge issued three years ago by a facility director to his staff at the Idaho Site has resulted in the implementation of several energy-conservation projects and huge cost savings to taxpayers.

  17. Department of Energy Idaho - Homepage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 March 8, 2016 Media Contact: Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov DOE Awards Contract for the Construction of Accelerated Retrieval Project (ARP) IX Cincinnati - The Department of Energy (DOE) Office of Environmental Management today awarded a contract to North Wind Services, LLC, Idaho Falls, Idaho, an American Native/Alaskan Native Owned Corporation as a

  18. Cleanup Progress Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup Progress Report - 2011 Oak Ridge's cleanup accomplishments during 2011. January 3, 2011 Cleanup

  19. Idaho's Energy Options

    SciTech Connect (OSTI)

    Robert M. Neilson

    2006-03-01

    This report, developed by the Idaho National Laboratory, is provided as an introduction to and an update of the status of technologies for the generation and use of energy. Its purpose is to provide information useful for identifying and evaluating Idahos energy options, and for developing and implementing Idahos energy direction and policies.

  20. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targeted Review, Idaho Site AMWTP Report - January 2015 January, 2015 Review of the Fire Protection Program at the Idaho Site Advanced Mixed Waste Treatment Project The U.S....

  1. Idaho Cold War Waste Removal Advancing as Work on Eighth Area Begins

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller, (208) 569-7806 Erik Simpson, (208) 390-9464 For Immediate Release: January 13, 2014 Idaho Cold War Waste Removal Advancing as Work on Eighth Area Begins IDAHO FALLS, ID - The U.S. Department of Energy and Idaho site cleanup contractor CH2M-WG Idaho (CWI) have begun removing Cold War weapons waste at the eighth area of the 97-acre Subsurface Disposal Area (SDA). The Idaho Site contains a total of nine targeted waste areas within the SDA. To date, six retrieval areas have been

  2. Idaho | Department of Energy

    Energy Savers [EERE]

    Idaho Idaho Following are links to compliance agreements involving the Idaho site. Brief summaries of the agreements also are included. PDF icon Public Service Company of Colorado v. Batt Agreement PDF icon Public Service Company of Colorado v. Batt Agreement Summary PDF icon Idaho National Engineering & Environmental Laboratory Consent Order, January 25, 2001 PDF icon Idaho National Engineering & Environmental Laboratory Consent Order, January 25, 2001 Summary PDF icon Idaho National

  3. U.S. Department of Energy Keeps Its Cleanup Commitments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy Keeps Its Cleanup Commitments By ELIZABETH SELLERS As significant progress continues on cleanup of legacy environmental challenges at the Idaho National Laboratory, there are two points I'd like to emphasize: Workers sort previously-buried waste. Inside of underground waste storage tank after cleaning was completed ready for grouting to begin. The U.S. Department of Energy is keeping its promises to Idahoans. In the last 20 years, DOE has met, on time or ahead of

  4. Secretary Chu Highlights Recovery Act Cleanup Progress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Cleanup Progress Secretary Chu Highlights Recovery Act Cleanup Progress March 23, 2010 - 12:00am Addthis OAK RIDGE, TENN. - Energy Secretary Steven Chu announced today that the Department's Environmental Management program has spent more than $1.5 billion in American Recovery and Reinvestment Act funds on cleanup projects around the country - 25 percent of the program's total - creating an estimated 14,400 jobs since the start of the Recovery Act. "Because of the Recovery Act,

  5. EM's Richland Operations Office Completes Chromium Cleanup along Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River | Department of Energy Richland Operations Office Completes Chromium Cleanup along Columbia River EM's Richland Operations Office Completes Chromium Cleanup along Columbia River September 24, 2015 - 12:25pm Addthis The inset photo shows Hanford's D and DR Reactor area during operations in the 1950s, and the larger photo shows how the site looked during final backfill activities earlier this year after a chromium contamination cleanup project. The inset photo shows Hanford's D and DR

  6. Chromium Groundwater Cleanup in Mortandad Canyon | Department of Energy

    Office of Environmental Management (EM)

    Cleanup in Mortandad Canyon Chromium Groundwater Cleanup in Mortandad Canyon Topic: Cheryl Rodriguez DOE and Danny Katzman LANL, Provided Information on the Status of the Characterization of the Chromium Groundwater Plume in Mortandad Canyon. Possible Clean-up Strategies were also covered in the Information Provided. PDF icon Chromium Update - September 24, 2014 More Documents & Publications Chromium Interim Measures Project and Ongoing Plume Investigation Chromium Groundwater Remediation

  7. WIPP - CBFO Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    more information, access DOE Environmental Management site at: http://www.em.doe.gov/closure/ For more information regarding the Accelerating Cleanup: Paths to Closure, contact Freida Huckeba at (505) 234-7315. Accelerating Cleanup: Paths to Closure (PtC) This document has been provided to you in PDF format. Please install Adobe Acrobat Reader before accessing these documents. For your convenience, each section of this document contains a Table of Contents complete with internal links. Just

  8. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories /environment/_assets/images/icon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past, minimize environmental impacts, and create a sustainable future. A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a

  9. Cleanup at Rocky Flats

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats

  10. BLM Idaho State Office | Open Energy Information

    Open Energy Info (EERE)

    Idaho State Office Jump to: navigation, search Logo: BLM Idaho State Office Name: BLM Idaho State Office Abbreviation: Idaho Address: 1387 S. Vinnell Way Place: Boise, Idaho Zip:...

  11. Cleanup Fact Sheets | Department of Energy

    Energy Savers [EERE]

    Services » Site Cleanup » Cleanup Fact Sheets Cleanup Fact Sheets Fact Sheets Available for Download East Tennessee Technology Park Cleanup Y-12 National Security Complex Cleanup Oak Ridge National Laboratory Cleanup OREM Accomplishments Timeline Environmental Laws and Regulations Site Cleanup Risk Removal Modernization Reindustrialization Waste Management Program Management Community Engagement

  12. Los Alamos Field Office Legacy Cleanup Summary November 2015 | Department

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Topics: Safety Contracts Acquisition Transition Key Events PDF icon EM-LA Cleanup Summary - November 2015 More Documents & Publications Department of Energy Accomplishments NNMCAB Board Minutes: September 30, 2015 Legacy Clean-up Completion Project Overview

  13. Idaho Recovery Act State Memo | Department of Energy

    Office of Environmental Management (EM)

    Idaho Recovery Act State Memo Idaho Recovery Act State Memo Idaho has substantial natural resources, including wind, geothermal, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Idaho are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to geothermal and alternative fuels, as well as major commitments to

  14. DOE Names New Director of Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    West Valley Demonstration Project in New York as Deputy Director of DOE's cleanup at the nation's first commercial spent nuclear fuel reprocessing facility Editorial Date May 19...

  15. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, D.M.; Taft, W.E.

    1994-12-20

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling. 1 figure.

  16. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, Douglas M.; Taft, William E.

    1994-01-01

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.

  17. Franklin County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    B. Places in Franklin County, Idaho Clifton, Idaho Dayton, Idaho Franklin, Idaho Oxford, Idaho Preston, Idaho Weston, Idaho Retrieved from "http:en.openei.orgw...

  18. Bingham County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Aberdeen, Idaho Atomic City, Idaho Basalt, Idaho Blackfoot, Idaho Firth, Idaho Fort Hall, Idaho Shelley, Idaho Retrieved from "http:en.openei.orgwindex.php?titleBinghamCo...

  19. Minidoka County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Minidoka County, Idaho Acequia, Idaho Burley, Idaho Heyburn, Idaho Minidoka, Idaho Paul, Idaho Rupert, Idaho Retrieved from "http:en.openei.orgwindex.php?titleMinidokaCo...

  20. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of six ordnance-testing sites across the country and the only one to test the 16-inch guns used on battleships in the Pacific Fleet during WW II. Ordnance manufactured, rebuilt,...

  1. EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced

    Office of Environmental Management (EM)

    Mixed Waste Treatment Project (AMWTP) | Department of Energy 90: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP) EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP) SUMMARY The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National

  2. 2016 National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG).

  3. Idaho CERCLA Disposal Facility at Idaho National Laboratory | Department of

    Energy Savers [EERE]

    Energy Idaho CERCLA Disposal Facility at Idaho National Laboratory Idaho CERCLA Disposal Facility at Idaho National Laboratory Full Document and Summary Versions are available for download PDF icon Idaho CERCLA Disposal Facility at Idaho National Laboratory PDF icon Summary - Idaho CERCLA Disposal Facility (ICDF) at Idaho National Laboratory More Documents & Publications Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Proposed On-Site Waste Disposal Facility

  4. About Hanford Cleanup - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Us About Hanford Cleanup About Us About Hanford Cleanup Regulators, Boards, Councils Hanford History Hanford Site Wide Programs Contact Us About Hanford Cleanup Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Cleanup For more than forty years, reactors located at Hanford produced plutonium for America's defense program. The process of making plutonium is extremely "inefficient" in that a massive amount of liquid and solid waste is generated while

  5. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sites Cleanup Sites The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. Oak Ridge has three primary cleanup sites within the Oak Ridge Reservation-the Oak

  6. Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Environmental Cleanup Learn more about the history, cleanup activities and possible future uses of the Hanford Site, a 586-square-mile government site in southeast Washington State. | Video courtesy of the Energy Department. The Energy Department is committed to a safe, complete cleanup of the environmental legacy of five decades of government-sponsored nuclear weapons development and nuclear energy research. As part of this mission, we safely and cost-effectively transport

  7. Idaho Save Energy Now Industries of the Future

    Broader source: Energy.gov [DOE]

    This fact sheet contains details regarding a Save Energy Now industrial energy efficiency project that the U.S. Department of Energy funded in Idaho.

  8. EIS-0290: Idaho National Engineering and Environmental Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho May 1, 2009 EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project January 2, 2006 EIS-0290-SA-01: Supplement Analysis ...

  9. Idaho Section 319 Grant Application | Open Energy Information

    Open Energy Info (EERE)

    to library Form: Idaho Section 319 Grant Application Abstract This page provides access to an online form Section 319 Project Application for grants for watershed and aquifer...

  10. Voluntary Protection Program Onsite Review, Idaho Treatment Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment...

  11. Richland Operations Office Cleanup Strategy, Scope

    Energy Savers [EERE]

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  12. 2012 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Congressional Nuclear Cleanup Caucus Briefings 2012 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 02/16/2012 - FY 2013 Budget Overview PDF icon 03/07/2012 - Richland Operations Office, WA PDF icon 03/21/2012 - Oak Ridge, TN PDF icon 03/22/2012 - Portsmouth/Paducah Project Office, OH-KY PDF icon

  13. Nuclear Cleanup, Storage, and Transportation

    Office of Environmental Management (EM)

    does the WIPP shutdown Impact New Mexico, Idaho, and South Carolina? Don Hancock Southwest Research and Information Center Additional funding from: Community Involvement Fund of the New Mexico Community Foundation INL - March 3, 2015 Idaho TRU waste dumping-1954-70 Idaho Digging up Waste Idaho TRU Waste Complex Savannah River Site - March 25, 2015 MIXED OXIDE (MOX) Fuel Plant LANL - September 29, 2015 WIPP Underground - October 1, 2015 10 10 10 * "Start Clean, Stay Clean" to dispose

  14. Site Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Site Cleanup A view of Building K-25 cleanup at the East Tenneseee Technology Park. A view of Building K-25 cleanup at the East Tenneseee Technology Park. Unlike many EM cleanup sites, Oak Ridge has numerous ongoing missions aside from EM. The success and rate of progress often depends on the amount of work the organization achieves at the site. At the East Tennessee Technology Park, EM is tasked with removing facilities associated with 40 years of uranium enrichment and production to

  15. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy RICHLAND, Wash. - In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure Contract, the nation's largest environmental cleanup closure project, managed by Washington Closure Hanford. The work has involved projects to clean up existing contamination and

  16. Y-12 National Security Complex Cleanup | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects completed at the Y-12 National Security Complex. This document discusses the following projects: Old Salvage Yard Scrap Removal Building 9735 Demolition Alpha 5 Project Beta 3 (9204-3) Legacy Material Disposition Project Beta 4 Legacy Material Disposition Project Biology Complex and Building 9769 Deactivation and Demolition Project Outfall 200 Conceptual Design Project Mercury

  17. Colorado and the Accelerated Cleanup at Rocky Flats

    SciTech Connect (OSTI)

    Spreng, C.

    2007-07-01

    When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

  18. Chromium Groundwater Cleanup

    Broader source: Energy.gov (indexed) [DOE]

    Los Alamos National Laboratory | UNCLASSIFIED | 1 Chromium Groundwater Cleanup in Mortandad Canyon for the Northern New Mexico Citizens' Advisory Board Los Alamos National Laboratory September 24, 2014 Operated by Los Alamos Security, LLC for the U.S. Department of Energy's NNSA LA-UR-14-27280 | Los Alamos National Laboratory | UNCLASSIFIED | 2 Presentation Overview § History, location and background - refresher § Nature and extent of Cr plume § Overall remediation strategy §

  19. WIPP Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other

  20. Occupational Medicine - Assistant PIA, Idaho National Laboratory...

    Energy Savers [EERE]

    Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho...

  1. Idaho Geological Survey | Open Energy Information

    Open Energy Info (EERE)

    The Idaho Geological Survey is located in Boise, Idaho. About Information on past oil and gas exploration wells in Idaho was transferred to the Idaho Geological Survey in...

  2. Department of Energy Idaho - State & Local

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links > State & Local State & Local City of Idaho Falls State of Idaho Home Page Idaho State Police Links to Idaho Sites Idaho Media Idaho Newspapers Television KIDK Idaho Falls - CBS, Local Channel 3 KIFI Idaho Falls - ABC, Local Channel 8 KPVI Pocatello - NBC, Local Channel 6 KMVT Twin Falls - CBS KBCI Boise - CBS KTVB Boise - NBC Idaho's State Seal

  3. 2007 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March - December 2007 12/11/07 DOE, Tribes sign a renewal of the Agreement in Principle 12/05/07 DOE-Idaho Leads Regional Combined Federal Campaign 11/28/07 INL Equipment to Aid Regional Response Team 11/21/07 DOE�s Idaho Operations Office Manager Elizabeth Sellers wins a Meritorious Presidential Rank Award 11/15/07 Waste Area Group 7 Proposed Plan 10/22/07 Agencies seek public comment on alternatives for cleanup of buried waste at INL site - 51 Kb 10/02/07 Engineering Test Reactor (ETR)

  4. Microsoft Word - Cleaning_Up_the_Idaho_Site_3_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleaning Up the Idaho Site: U.S. Department of Energy Performance to Date Over the years, the U.S. Department of Energy (DOE) has accomplished many of its legally-enforceable milestones governing cleanup and the management and disposal of radioactive and hazardous wastes at DOE's Idaho Site on time or ahead of schedule. DOE and its contractors have met 800 of 804 enforceable milestones on time over the past 20 years. Some of the milestones that were not completed according to the initially

  5. Custer County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype B. Places in Custer County, Idaho Challis, Idaho Clayton, Idaho Mackay, Idaho Stanley, Idaho Retrieved from "http:en.openei.orgwindex.php?titleCusterCounty,Idaho&ol...

  6. Blaine County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Energy Capital LLC Power Engineers Inc Places in Blaine County, Idaho Bellevue, Idaho Carey, Idaho Hailey, Idaho Ketchum, Idaho Sun Valley, Idaho Retrieved from "http:...

  7. he Hanford Story Tank Waste Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    he Hanford Story Tank Waste Cleanup he Hanford Story Tank Waste Cleanup Addthis Description The Hanford Story Tank Waste Cleanup

  8. Microsoft Word - DOE-ID-14-015 Idaho State B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Idaho State University Reactor Laboratory Modernization SECTION B. Project Description Idaho State University proposes to modernize radiation detectors and associated instruments used to perform laboratory experiments and research in the Idaho State University Reactor Laboratory. ISU will upgrade radiation detectors, the sub-critical assembly grid plates, tank filling and draining equipment, and handrails

  9. Idaho National Laboratory

    Broader source: Energy.gov [DOE]

    The Snake River Geothermal Consortium (SRGC) is a research partnership focused on advancing geothermal energy. Hosted by the Idaho National Laboratory (INL), SRGC proposes establishing FORGE as a resource for technology development, deployment, and validation. Their team includes members from national laboratories, universities, industry, and state and federal agencies. The technical team consists of members from Baker Hughes, the Center for Advanced Energy Studies (CAES) – Idaho National Laboratory, University of Idaho, Idaho State University, Boise State University, University of Wyoming - Campbell Scientific, Chena Power, Geothermal Resources Group, Idaho Department of Water Resources, Idaho Geologic Survey, Lawrence Livermore National Laboratory, Mink GeoHydro, National Renewable Energy Laboratory, University of Oklahoma, University of Utah, U.S. Geothermal, and the U.S. Geological Survey (USGS).

  10. Cleanup Chief Visits Portsmouth, Paducah Sites | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Chief Visits Portsmouth, Paducah Sites Cleanup Chief Visits Portsmouth, Paducah Sites February 11, 2016 - 12:45pm Addthis EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure review with facility operator Jim Burnett (left) of Fluor Paducah Deactivation Project at C-337, where a former uranium enrichment process building will be the first facility to undergo deposit removal by in-situ chemical treatment. EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure

  11. Groundwater Cleanup Operational Changes Are Being Implemented at Fernald

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preserve | Department of Energy Groundwater Cleanup Operational Changes Are Being Implemented at Fernald Preserve Groundwater Cleanup Operational Changes Are Being Implemented at Fernald Preserve October 13, 2014 - 6:38pm Addthis What does this project do? Goal 1. Protect human health and the environment. Uranium contamination in the Great Miami Aquifer-at the Fernald Preserve, Ohio, Site-is being removed from the groundwater through a pump-and-treatment operation, which until this year,

  12. Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC- EA-2007-03

    Broader source: Energy.gov [DOE]

    Issued to CH2M-Washington Group Idaho, LLC, related to Radiation Protection Program Deficiencies at the Radioactive Waste Management Complex - Accelerated Retrieval Project at the Idaho National Laboratory

  13. Idaho Settlement Agreement Signed at Idaho National Laboratory | Department

    Office of Environmental Management (EM)

    of Energy Settlement Agreement Signed at Idaho National Laboratory Idaho Settlement Agreement Signed at Idaho National Laboratory Idaho Settlement Agreement was signed by DOE and the state of Idaho. It outlined legally binding spent nuclear fuel and waste removal milestones that must be accomplished by 2035. PDF icon 1995 Settlement Agreement More Documents & Publications Idaho EIS-0251: Final Environmental Impact Statement EIS-0251: Record of Decision

  14. Idaho National Laboratory April

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho National Laboratory April 24, 2015 CCN 235661 Mr. Jeffrey C. Fogg DOE-ID Contracting Officer U.S. Department of Energy Idaho Operations Office (DOE-ID) 1955 Fremont Avenue Idaho Falls, ID 83415-1221 SUBJECT: Contract No. DE-ACO7-051D14517 - Battelle Energy Alliance, LLC Response to Department of Energy, Idaho Operations Office Request for Information to Support Supplement Analysis of Proposed Commercial Fuel Research and Development Efforts Reference: J. C. Fogg letter to D. M. Storms,

  15. Summary report of the drilling technologies tested at the Integrated Demonstration Project for cleanup of organic contaminants in soils and groundwater at non-arid sites

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Department of Energy`s Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of volatile organic compounds in soil and groundwater at SRS. The overall goal of the program is the demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Horizontal environmental well installation technology was one of the remediation technologies that was demonstrated at SRS. Four distinctly different systems of directional drilling and horizontal well installations were successfully demonstrated and evaluated. The four systems were developed in the petroleum industry, the river crossing industry, and the utility industry. The transfer of information concerning the horizontal environmental well installations has been facilitated by publishing a series of reports describing each individual demonstration. This is the final report in the series and provides a comprehensive evaluation of all four systems. The objectives of this report are to summarize the strengths and weaknesses of each drilling technology, describe and compare the problems encountered by each drilling technology, compare the compatibility of each technology with varying logistical and geological conditions, and discuss the expense of using each technology. This report is designed to be a horizontal environmental well reference document for the environmental remediation industry. An environmental problem holder may use this report to evaluate a directional drilling technology for use at his/her site.

  16. Smart Grid Savings and Grid Integration of Renewables in Idaho

    Energy Savers [EERE]

    1 Smart Grid Savings and Grid Integration of Renewables in Idaho Idaho Power Company (IPC) serves more than 495,000 customers in southern Idaho and eastern Oregon. IPC is vertically-integrated and manages power generation, transmission, distribution, and demand-side resources. Faced with grid modernization challenges from new wind power capacity, rising summer peak demands, and aging electricity delivery infrastructure, IPC's Smart Grid Investment Grant (SGIG) project is multi-faceted and

  17. Idaho Students Learning Lessons on Energy Efficiency | Department of Energy

    Office of Environmental Management (EM)

    Idaho Students Learning Lessons on Energy Efficiency Idaho Students Learning Lessons on Energy Efficiency December 9, 2009 - 12:07pm Addthis Joshua DeLung When Idaho officials decided to spend Recovery Act money to make their school buildings more energy efficient, it set off a chain reaction. Now, the project is creating more comfortable and safe learning environments for its students and providing them with examples of how to save energy. At the same time, it's saving taxpayers some dough. The

  18. Idaho Falls, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Energy Companies in Idaho Falls, Idaho ALDACOR Intrepid Technology and Resources Inc References US Census Bureau Incorporated place and minor civil division...

  19. Boise, Idaho: Saving Money and Reducing Waste

    Broader source: Energy.gov [DOE]

    Thanks to a $1.2 million grant from the Departments Energy Efficiency and Conservation Block Grant (EECBG) Program, the city of Boise, Idaho, will replace and install 1,450 LED streetlights by the end of this month. The project is projected to save $1.2 million over the next 15 years.

  20. Idaho Site | Department of Energy

    Office of Environmental Management (EM)

    Idaho Site Idaho Site Idaho National Laboratory Advance Training Reactor | September 2009 Aerial View Idaho National Laboratory Advance Training Reactor | September 2009 Aerial View Idaho National Laboratory Idaho National Laboratory's (INL) mission is to ensure the nation's energy security with safe, competitive, and sustainable energy systems and unique national and homeland security capabilities. To support these activities, INL operates numerous laboratories, reactors, test facilities, waste

  1. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting Apparatus, systems, and methods for...

  2. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting You are accessing a document from...

  3. New Contract Helps Portsmouth GDP Cleanup

    Broader source: Energy.gov [DOE]

    To accelerate the Portsmouth GDP cleanup efforts left over from the Cold War, the Department of Energy made a huge step forward in our nuclear environmental cleanup efforts.

  4. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  5. Enterprise Assessments Operational Awareness Record for the Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project, OAR # EA-ID-2015-10-22

    Office of Environmental Management (EM)

    EA Operational Awareness Record Report Number: EA-ID-2015-10-22 Site: Idaho Site Subject: Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project Dates of Activity: 10/19/2015 - 10/22/2015 Report Preparer: Aleem E. Boatright Activity Description / Purpose: The Office of Environment, Safety and Health Assessments, within the Office of Enterprise Assessments (EA), performed a

  6. Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - June 2014 | Department of Energy Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 June 2014 Review of ITG/AMWTP as a "transition" participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Idaho Treatment Group, LLC (ITG), at the

  7. IDAHO NATIONAL LABORATORY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Idaho National Laboratory (INL) You are here: DOE-ID Home > Inside ID > Brief History Site History The Idaho National Laboratory (INL), an 890-square-mile section of desert in southeast Idaho, was established in 1949 as the National Reactor Testing Station. Initially, the missions at the INL were the development of civilian and defense nuclear reactor technologies and management of spent nuclear fuel. Fifty-two reactors—most of them first-of-a-kind—were built, including the Navy’s

  8. Idaho/Transmission/Agency Links | Open Energy Information

    Open Energy Info (EERE)

    State Agency Links Idaho Department of Fish and Game Idaho State Historical Society Idaho Department of Environmental Quality Idaho Transportation Department Idaho Department of...

  9. Clearwater County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype B. Places in Clearwater County, Idaho Elk River, Idaho Orofino, Idaho Pierce, Idaho Weippe, Idaho Retrieved from "http:en.openei.orgwindex.php?titleClearwater...

  10. EM's Los Alamos Site Completes Canyon-Side Cleanup of

    Office of Environmental Management (EM)

    Mercury-Contaminated Soil | Department of Energy Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil EM's Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil July 28, 2015 - 12:00pm Addthis A spider excavator extracts mercury-contaminated soil. A spider excavator extracts mercury-contaminated soil. Workers position a crane above the project site. Workers position a crane above the project site. A waste container is loaded for off-site disposal. A

  11. Paducah Cleanup Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Milestones Paducah Cleanup Milestones The Paducah Site Management Plan sets forth enforceable milestones for cleanup activities. These activities include a series of prioritized cleanup actions, ongoing analysis to support future cleanup decisions, and eventual D&D of the gaseous diffusion plant. FY 2015 - Key Milestones/Outlook Issue Federal Facility Agreement Annual Site Management Plan (D1) Issue Burial Grounds Solid Waste Management Unit 5 and 6 Record of Decision (D1) C-400 -

  12. Central Plateau Inner Area Cleanup Principles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inner Area Cleanup Principles * Cleanup Principles are the initial conditions and approaches to developing cleanup decisions in the Inner Area * These Principles will guide the development of the Remedial Investigations and Feasibility Studies (RI/FS) * These Principles will help DOE produce RI/FS documents to better meet regulator expectations * Formal agreement on cleanup, as influenced by these Principles, does not happen until the Record of Decision What are Cleanup Principles? 2 * The Inner

  13. Idaho Power- Net Metering

    Office of Energy Efficiency and Renewable Energy (EERE)

    In July 2013, the PUC issued an order in response to Idaho Power's application to modify its net metering program. The ruling removed a previously existing service capacity cap of 2.9 MW and chan...

  14. Idaho_SmithPhillips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Smith Phillips Site - Idaho Wind Anemometer Loan Program Latitude: N. 42 deg. 23.34' Longitude: W. 112 deg. 12.6' Elevation: 4967' Placed in service: December 14, 2005...

  15. CASL - Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for advanced NE R&D Integration of LWR Sustainability system analysis tools with CASL in-core tools Advanced fuel performance code Learn More Idaho National Laboratory INL Core...

  16. Department of Energy Idaho - Higher Education Links

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Universities State Colleges College of Southern Idaho Eastern Idaho Technical College Lewis-Clark State College North Idaho College State Universities Boise State University...

  17. Department of Energy Idaho -Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Web Policies No Fear Act Site Map Privacy Phone Book You are here: DOE-ID Home > Site Map Site Map Manager's Welcome Inside ID DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) DOE-ID Agreement in Principle Organization Chart Employment Opportunities New Employee Orientation EOD Checklist - 68 KB EOD Forms - 261 KB DOE/Tribal Agreement in Principle Strategic Partnership Projects (formerly WFO) Idaho Site Contractor Timeline - 3.7 MB ID@Work Introduces some of the

  18. Idaho - IC 61-516 - Priority Designation for Electric Transmission...

    Open Energy Info (EERE)

    Idaho - IC 61-516 - Priority Designation for Electric Transmission Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  19. Integrated low emission cleanup system for direct coal-fueled turbines (electrostatic agglomeration). Project quarterly report, September 1, 1991--December 31, 1991

    SciTech Connect (OSTI)

    Quimby, J.M.

    1992-02-01

    The objective of this contract is to investigate the removal of SO{sub x} and particulate matter from direct coal-fired combustion gas streams at high temperature and high pressure conditions. This investigation will be accomplished through a bench-scale testing and evaluation program employing sorbent mixed with a coal-water slurry for SO{sub x} removal, and an innovative particulate control concept. The particulate control device utilizes electrostatic agglomeration followed by a high efficiency mechanical collector (cyclone). The process goal is to achieve particulate collection efficiency better than that required by the 1979 new source performance standards. An additional goal is to demonstrate 70% SO{sub x} removal efficiency. This research project is now in the second of a 3 phase (Phase II) project. Phase II is to fabricate the combustor and particulate control devices and install the system at a test facility located at Research-Cottrell`s, KVB Western Laboratory, Santa Ana, CA. There are three functional categories, or tasks which are to be completed in sequence. These tasks are itemized as follows: Design, procurement, and installation; Shakedown and startup; Reporting. Attempts to validate the concept of electrostatic agglomeration were not possible in the shakedown program before budget constraints halted the program. What was learned was that electrostatic precipitation is feasible in the temperature range of 1600--1800{degrees}F and at pressures above 10 atmospheres.

  20. Scope Management Baseline Development (FPM 208), Idaho | Department of

    Energy Savers [EERE]

    Energy Scope Management Baseline Development (FPM 208), Idaho Scope Management Baseline Development (FPM 208), Idaho March 29, 2016 8:00AM EDT to March 31, 2016 5:00PM EDT Scope Management Baseline Development Level 2 Required Course 3 days / 24 CLPs This course is designed to enhance a Program or Project Manager's ability to clearly define requirements and scope, develop a defensible baseline, and manage conformance to the baseline throughout the project life-cycle. The course emphasizes

  1. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January

    Office of Environmental Management (EM)

    2015 | Department of Energy Site AMWTP Report - January 2015 Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January 2015 January, 2015 Review of the Fire Protection Program at the Idaho Site Advanced Mixed Waste Treatment Project The U.S. Department of Energy independent Office of Enterprise Assessments (EA), Office of Environment, Safety and Health Assessments, conducted an independent review of the Advanced Mixed Waste Treatment Project (AMWTP) fire protection program

  2. EM Makes Significant Progress on Dispositioning Transuranic Waste at Idaho

    Office of Environmental Management (EM)

    Site | Department of Energy Makes Significant Progress on Dispositioning Transuranic Waste at Idaho Site EM Makes Significant Progress on Dispositioning Transuranic Waste at Idaho Site December 24, 2013 - 12:00pm Addthis Workers treat sludge-bearing, transuranic waste from the Advanced Mixed Waste Treatment Project. Workers treat sludge-bearing, transuranic waste from the Advanced Mixed Waste Treatment Project. A tank at the Materials and Fuels Complex containing residual sodium is moved

  3. Radiological cleanup of Enewetak Atoll

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    For 8 years, from 1972 until 1980, the United States planned and carried out the radiological cleanup, rehabilitation, and resettlement of Enewetak Atoll in the Marshall Islands. This documentary records, from the perspective of DOD, the background, decisions, actions, and results of this major national and international effort. The documentary is designed: First, to provide a historical document which records with accuracy this major event in the history of Enewetak Atoll, the Marshall Islands, the Trust Territory of the Pacific Islands, Micronesia, the Pacific Basin, and the United States. Second, to provide a definitive record of the radiological contamination of the Atoll. Third, to provide a detailed record of the radiological exposure of the cleanup forces themselves. Fourth, to provide a useful guide for subsequent radiological cleanup efforts elsewhere.

  4. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect (OSTI)

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a

  5. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  6. Analysis Activities at Idaho National Engineering & Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Activities at Idaho National Engineering & Environmental Laboratory Analysis Activities at Idaho National Engineering & Environmental Laboratory Presentation on INEENL's analysis...

  7. Idaho Code | Open Energy Information

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Code Citation Idaho Code (2014). Retrieved from "http:en.openei.org...

  8. Occupational Medicine - Assistant PIA, Idaho National Laboratory |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory PDF icon Occupational Medicine - Assistant PIA, Idaho National Laboratory More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - INL Education

  9. EIS-0074: Long-Term Management of Defense High-Level Radioactive Wastes Idaho Chemical Processing Plant, Idaho National Engineering Lab, Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy prepared this statement to analyze the environmental implications of the proposed selection of a strategy for long-term management of the high-level radioactive wastes generated as part of the national defense effort at the Department's Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. The project was cancelled after the Draft Environmental Impact Statement was produced.

  10. K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Shoemaker J.E.

    2009-05-13

    K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

  11. Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 | Department of Energy

    Energy Savers [EERE]

    M-WG Idaho, LLC - WCO-2011-01 Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 October 6, 2011 Issued to CH2M-WG Idaho, LLC related to a Hoisting Incident that occurred at the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory On October 6, 2011, the U.S. Department of Energy (DOE) Office of Health Safety and Security's Office of Enforcement and Oversight issued a Consent Order to CH2M-WG Idaho, LLC (CWI) for deficiencies in CWI's oversight of its construction subcontractor

  12. Enforcement Letter, CH2M-WG Idaho - September 28, 2011 | Department of

    Office of Environmental Management (EM)

    Energy M-WG Idaho - September 28, 2011 Enforcement Letter, CH2M-WG Idaho - September 28, 2011 Issued to CH2M-WG Idaho, LLC related to Quality Assurance and Work Control Issues during Construction of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory On September 28, 2011, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued an Enforcement Letter to CH2M-Washington Group Idaho, LLC (NEL-2011-01) related

  13. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  14. 2016 National Cleanup Workshop | Department of Energy

    Energy Savers [EERE]

    2016 National Cleanup Workshop 2016 National Cleanup Workshop 2016 National Cleanup Workshop The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG). The workshop will bring together senior DOE executives, officials from DOE sites, industry executives, and other

  15. Washington Closure Hanford: Cleanup Progress Along Hanford's...

    Broader source: Energy.gov (indexed) [DOE]

    Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear...

  16. EM to Employ New Robotic Arms in Cleanup

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM is working to obtain new robotic arms to help in the treatment of legacy waste at an Idaho Site facility.

  17. EA-0845: Expansion of the Idaho National Engineering Laboratory Research Center, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to expand and upgrade facilities at the U.S. Department of Energy's Idaho National Engineering Laboratory Research Center, located in Idaho...

  18. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    SciTech Connect (OSTI)

    Zhu, Ming; Moorer, Richard

    2013-07-01

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in integrated risk assessment that could assist in the EM prioritization efforts. (authors)

  19. EM Develops Database for Efficient Solutions to Nuclear Cleanup Challenges Across Complex

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Many deactivation and decommissioning (D&D) projects across the EM complex require robotic and remote handling systems to protect workers during nuclear cleanup operations.

  20. Idaho National Engineering Laboratory Waste Management Operations Roadmap Document

    SciTech Connect (OSTI)

    Bullock, M.

    1992-04-01

    At the direction of the Department of Energy-Headquarters (DOE-HQ), the DOE Idaho Field Office (DOE-ID) is developing roadmaps for Environmental Restoration and Waste Management (ER&WM) activities at Idaho National Engineering Laboratory (INEL). DOE-ID has convened a select group of contractor personnel from EG&G Idaho, Inc. to assist DOE-ID personnel with the roadmapping project. This document is a report on the initial stages of the first phase of the INEL`s roadmapping efforts.

  1. Department of Energy Idaho - Inside DOE-ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inside ID Inside Idaho Operations Office (DOE-ID) DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) DOE-ID Agreement in Principle Organization Chart Employment Opportunities New Employee Orientation EOD Checklist - 68 KB EOD Forms - 261 KB DOE/Tribal Agreement in Principle Strategic Partnership Projects (formerly WFO) Idaho Site Contractor Timeline - 3.7 MB ID@Work Introduces some of the DOE-ID employees and the jobs they perform. Last Updated: 05/21/2015

  2. Grouting at the Idaho National Laboratory Tank Farm Facility, R. Mark Shaw

    Office of Environmental Management (EM)

    Grouting at the Idaho National Laboratory Tank Farm Facility R. Mark Shaw, U. S. Department of Energy safety v performance v cleanup v closure M E Environmental Management Environmental Management 2 Topics/Agenda * Tank Farm Overview * Tank and Vault Grouting * Cooling Coil and Transfer Line Grouting safety v performance v cleanup v closure M E Environmental Management Environmental Management 3 INTEC TANK FARM CLOSURE INTEC TANK FARM CLOSURE VES-WM-103 VES-WM-104 VES-WM-105 VES-WM-106 182 183

  3. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin |

    Office of Environmental Management (EM)

    Department of Energy Accomplish Cleanup of Second Cold War Coal Ash Basin Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin American Recovery and Reinvestment Act workers recently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part

  4. Washington County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Climate Zone Number 5 Climate Zone Subtype B. Places in Washington County, Idaho Cambridge, Idaho Midvale, Idaho Weiser, Idaho Retrieved from "http:en.openei.orgw...

  5. Idaho Workers Complete Last of Transuranic Waste Transfers Funded by

    Office of Environmental Management (EM)

    Recovery Act | Department of Energy Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste &ndash; each weighing up to 15 tons &ndash; to a facility for repackaging and shipment to a permanent disposal location. As part of a project funded by $90 million

  6. DOE-Idaho Operations Summary For Aug. 4 to Aug. 17, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aug. 18: A technician entered the Box Opening Gantry Robot room at the Advanced Mixed Waste Treatment Facility without a pre-job briefing and a proper lockout/tagout in place. A fact-finding meeting was held to determine the cause of the failure to follow procedure. (EM-ID-BBWI-AMWTF-2009-0012). Operational Summary Waste shipments: Seventeen shipments of contact-handled transuranic waste were made from Idaho to the Waste Isolation Pilot Plant in New Mexico the week ending Aug. 29. Idaho Cleanup

  7. DRAFT Central Plateau Cleanup Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J.D. Dowell: DOE-RL John Price: Ecology Dennis Faulk: EPA October 9, 2012 2 River Corridor * 100 Area interim actions extended to - Incorporate 154 additional waste sites - Address prior extensive deep excavation of hexavalent chromium contamination * 100 Area decision documents - Extend 100 B/C decision documents schedule to enable collection of additional groundwater data for cleanup decision - Delay 100-N document several months to avoid overlap of public comment 3 River Corridor * 100 Area -

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  9. Accelerated cleanup risk reduction

    SciTech Connect (OSTI)

    Knapp, R.B.; Aines, R.M.; Blake, R.G.; Copeland, A.B.; Newmark, R.L.; Tompson, A.F.B.

    1998-02-01

    There is no proven technology for remediating contaminant plume source regions in a heterogeneous subsurface. This project is an interdisciplinary effort to develop the requisite new technologies so that will be rapidly accepted by the remediation community. Our technology focus is hydrous pyrolysis/oxidation (HPO) which is a novel in situ thermal technique. We have expanded this core technology to leverage the action of steam injection and place an in situ microbial filter downstream to intercept and destroy the accelerated movement of contaminated groundwater. Most contaminant plume source regions, including the chlorinated solvent plume at LLNL, are in subsurface media characterized by a wide range in hydraulic conductivity. At LLNL, the main conduits for contaminant transport are buried stream channels composed of gravels and sands; these have a hydraulic conductivity in the range of 10{sup -1} to 10{sup -2} cm/s. Clay and silt units with a hydraulic conductivity of 10{sup -1} to 10{sup -6} cm/s bound these buried channels; these are barriers to groundwater movement and contain the highest contaminant concentrations in the source region. New remediation technologies are required because the current ones preferentially access the high conductivity units. HPO is an innovative process for the in situ destruction of contaminants in the entire subsurface. It operates by the injection of steam. We have demonstrated in laboratory experiments that many contaminants rapidly oxidize to harmless compounds at temperatures easily achieved by injecting steam, provided sufficient dissolved oxygen is present. One important challenge in a heterogeneous source region is getting heat, contaminants, and an oxidizing agent in the same place at the same time. We have used the NUFT computer program to simulate the cyclic injection of steam into a contaminated aquifer for design of a field demonstration. We used an 8 hour, steam/oxygen injection cycle followed by a 56 hour relaxation period in which the well was `capped`. Our results show the formation of an inclined gas phase during injection and a fast collapse of the steam zone within an hour of terminating steam injection. The majority of destruction occurs during the collapse phase, when contaminant laden water is drawn back towards the well. Little to no noncondensible gasses are created in this process, removing any possibility of sparging processes interfering with contaminant destruction. Our models suggest that the thermal region should be as hot and as large as possible. To have HPO accepted, we need to demonstrate the in situ destruction of contaminants. This requires the ability to inexpensively sample at depth and under high temperatures. We proved the ability to implies monitoring points at depths exceeding 150 feet in highly heterogeneous soils by use of cone penetrometry. In addition, an extractive system has been developed for sampling fluids and measuring their chemistry under the range of extreme conditions expected. We conducted a collaborative field test of HPO at a Superfund site in southern California where the contaminant is mainly creosote and pentachlorophenol. Field results confirm the destruction of contaminants by HPO, validate our field design from simulations, demonstrate that accurate field measurements of the critical fluid parameters can be obtained using existing monitoring wells (and minimal capital cost) and yield reliable cost estimates for future commercial application. We also tested the in situ microbial filter technology as a means to intercept and destroy the accelerated flow of contaminants caused by the injection of steam. A series of laboratory and field tests revealed that the selected bacterial species effectively degrades trichloroethene in LLNL Groundwater and under LLNL site conditions. In addition, it was demonstrated that the bacteria effectively attach to the LLNL subsurface media. An in-well treatability study indicated that the bacteria initially degrade greater than 99% of the contaminant, to concentrations less than regulatory limit

  10. Ergonomic assessments of three Idaho National Engineering Laboratory cafeterias

    SciTech Connect (OSTI)

    Ostrom, L.T.; Romero, H.A.; Gilbert, B.G.; Wilhelmsen, C.A.

    1993-05-01

    The Idaho National Engineering Laboratory is a Department of Energy facility that performs a variety of engineering and research projects. EG&G Idaho is the prime contractor for the laboratory and, as such, performs the support functions in addition to technical, research, and development functions. As a part of the EG&G Idaho Industrial Hygiene Initiative, ergonomic assessments were conducted at three Idaho National Engineering Laboratory Cafeterias. The purposes of the assessments were to determine whether ergonomic problems existed in the work places and, if so, to make recommendations to improve the work place and task designs. The study showed there were ergonomic problems in all three cafeterias assessed. The primary ergonomic stresses observed included wrist and shoulder stress in the dish washing task, postural stress in the dish washing and food preparation tasks, and back stress in the food handling tasks.

  11. Idaho National Laboratory (INL) Sitewide Institutional Controls Plan

    SciTech Connect (OSTI)

    W. L. Jolley

    2006-07-27

    On November 9, 2002, the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy (DOE), and the Idaho Department of Environmental Quality approved the Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites, which requires a Sitewide Institutional Controls Plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. The revision is needed to provide an update as remedial actions are completed and new areas of concern are found. This Sitewide Institutional Controls Plan is based on guidance in the May 3, 1999, EPA Region 10 Final Policy on the Use of Institutional Controls at Federal Facilities; the September 29, 2000, EPA guidance Institutional Controls: A Site Manager's Guide to Identifying, Evaluating, and Selecting Institutional Controls at Superfund and RCRA Corrective Action Cleanups; and the April 9, 2003, DOE Policy 454.1, "Use of Institutional Controls." These policies establish measures that ensure short- and long-term effectiveness of institutional controls that protect human health and the environment at federal facility sites undergoing remedial action pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or corrective action pursuant to the Resource Conservation and Recovery Act (RCRA). The site-specific institutional controls currently in place at the Idaho National Laboratory are documented in this Sitewide Institutional Controls Plan. This plan is being updated, along with the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan, to reflect the progress of remedial activities and changes in CERCLA sites.

  12. DOE National Cleanup Workshop | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program DOE Assistant Secretary for Environmental Management Monica Regalbuto speaks to more than 350 people at the National Cleanup Workshop just outside Washington, D.C. Read more Panelists Update Workshop Participants on Waste Isolation Pilot Plant Recovery Panelists Update Workshop Participants on Waste Isolation

  13. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  14. Idaho Site D&D Crew Uses Specialized Tools to Cut Apart Massive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    D&D Crew Uses Specialized Tools to Cut Apart Massive Tank in Demolition Project Idaho Site D&D Crew Uses Specialized Tools to Cut Apart Massive Tank in Demolition Project November...

  15. DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants |

    Office of Environmental Management (EM)

    Department of Energy DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) announces a collaborative project with Research Triangle Institute (RTI) International to design, build, and test a warm gas cleanup system to remove multiple contaminants from coal-derived syngas. The 50-MWe system will include technologies to remove

  16. DRAFT Central Plateau Cleanup Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Doug Shoop: DOE-RL John Price: Ecology Dave Einan: EPA November 2, 2012 2 River Corridor * 100 Area interim actions extended to 3/31/17 - Incorporate 154 additional waste sites - Address prior extensive deep excavation of hexavalent chromium contamination * 100 Area decision documents - Extend 100 B/C decision documents schedule to 12/15/16 to enable collection of additional groundwater data for cleanup decision - Delay 100-N document to 6/30/13 to avoid too many documents out for public comment

  17. Idaho Waste Retrieval Facility Begins New Role

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – A waste retrieval facility constructed over a former buried radioactive waste disposal cell, known as Pit 9, at the Idaho site has been repurposed for treating 6,000 drums of...

  18. Boise, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Boise is a city in Ada County, Idaho. It falls under Idaho's 1st congressional district and Idaho's...

  19. Kamiah, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    is a stub. You can help OpenEI by expanding it. Kamiah is a city in Idaho County and Lewis County, Idaho. It falls under Idaho's 1st congressional district.12 References...

  20. The ABCs of Hanford Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ABC's of Hanford Cleanup A B C ARRA Budget Community Relations Plan Asbestos Branching Out Columbia River Workshops Baton Chromium Badgers

  1. Tank Farm Area Cleanup Decision-Making

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area Cleanup Decision-Making Groundwater Vadose Zone Single Shell Tank System Closure (tanks, structures and pipelines) * Washington State Hazardous Waste Management Act (Resource...

  2. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email...

  3. EECBG Success Story: Boise, Idaho: Saving Money and Reducing Waste

    Broader source: Energy.gov [DOE]

    Thanks to a $1.2 million grant from the Departments Energy Efficiency and Conservation Block Grant (EECBG) Program, the city of Boise, Idaho, will replace and install 1,450 LED streetlights by the end of this month. The project is projected to save $1.2 million over the next 15 years. Learn more .

  4. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A p r i l 12, 2007 SUBJECT: Final Environmental Assessment for the National Security Test Range and Finding of No Significant Impact (TD&D-NS-07-013) Dear Interested Party: The U.S. Department of Energy (DOE) has completed the Final Environmental Assessment (EA) for the National Security Test Range at the Idaho National Laboratory and determined that a Finding of No Significant Impact (FONSI) was appropriate. The draft EA was made available for 37-day public review and comment period on

  5. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2. 2010 Josh Berman 2 N. Riverside Plaza, Suite 2250 Chicago, IL 60606 SUBJECT: FOIA Response (10-034) (lD-201O-01859-F)(OHA Case No. TFA-0404) (OM-PA-I0- 062) Dear Mr. Berman: This is a revised final response from the Idaho Operations Office (DOE-ID), regarding your July 22, 2010, Freedom ofInformation Act (FOIA) request. In that letter you requested: * Richard Boardman Emails * WoodiGrubick Emails FY 2006 * Wood/Grubick Emails FY 2007 * WoodiGrubick Emails FY 2008 * WoodiGrubick

  6. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31,2010 Rod Wetsch 420 County Road 26 Beulah, ND 58523 SUBJECT: FOIA Response (10-035) (ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act Request. In that e-mail you requested documents relating to: "vulnerabilities of running desktop applications (Word, Excel, and PowerPoint) on the same platform as the process control systems applications." The administrator for

  7. Enterprise Assessments Operational Awareness Record for the Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the IMCL and the AMWTP, OAR # EA-ID-2015-10-22

    Broader source: Energy.gov [DOE]

    Enterprise Assessments Operational Awareness Record, Idaho Site Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project

  8. Integrated Safety Management Workshop Registration, PIA, Idaho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho National Laboratory More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA - INL Education Programs Business ...

  9. Eagle, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Idaho's 1st congressional district.12 Registered Energy Companies in Eagle, Idaho Hyperion Energy References US Census Bureau Incorporated place and minor civil division...

  10. Buhl, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Idaho's 2nd congressional district.12 Registered Energy Companies in Buhl, Idaho Magic Wind LLC References US Census Bureau Incorporated place and minor civil division...

  11. Idaho Appellate Rules | Open Energy Information

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Appellate Rules Citation Idaho Appellate Rules (2014). Retrieved from...

  12. Idaho Geothermal Resources Webpage | Open Energy Information

    Open Energy Info (EERE)

    Resources Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Geothermal Resources Webpage Abstract Overview of Idaho's Geothermal Program....

  13. Idaho Power- New Building Efficiency Program

    Broader source: Energy.gov [DOE]

    Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to install new equipment above code in participating facilities. The utility provides rebates for...

  14. Integrated Safety Management Workshop Registration, PIA, Idaho...

    Energy Savers [EERE]

    Idaho National Laboratory More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA - INL Education Programs Business...

  15. Idaho Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Idaho Public Utilities Commission Address: P.O. Box 83720 Place: Boise, ID Zip: 83720 Website: www.puc.idaho.gov Coordinates:...

  16. Idaho Power- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Idaho Power offers a variety of incentives for residential customers in Idaho and Oregon. The Heating and Cooling Program offers incentives for residential customers who purchase and have...

  17. Idaho Power- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Idaho Power offers a variety of incentives for the installation of heating and cooling systems for residential customers living in both Oregon and Idaho.

  18. Idaho National Engineering & Environmental Laboratory Consent...

    Office of Environmental Management (EM)

    (NOV) dated August 7, 2000 without litigation Parties DOE; Idaho Department of Environmental Quality; Bechtel BWXT Idaho, LLC (BBWI) Date 1252001 SCOPE * Resolve the alleged...

  19. Idaho Transportation Department | Open Energy Information

    Open Energy Info (EERE)

    Department Name: Idaho Transportation Department Address: 3311 W. State St. PO Box 7129 Place: Boise, Idaho Zip: 83707-1129 Region: Rockies Area Phone Number:...

  20. Current Reactor Physics Benchmark Activities at the Idaho National Laboratory

    SciTech Connect (OSTI)

    John D. Bess; Margaret A. Marshall; Mackenzie L. Gorham; Joseph Christensen; James C. Turnbull; Kim Clark

    2011-11-01

    The International Reactor Physics Experiment Evaluation Project (IRPhEP) [1] and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) [2] were established to preserve integral reactor physics and criticality experiment data for present and future research. These valuable assets provide the basis for recording, developing, and validating our integral nuclear data, and experimental and computational methods. These projects are managed through the Idaho National Laboratory (INL) and the Organisation for Economic Co-operation and Development Nuclear Energy Agency (OECD-NEA). Staff and students at the Department of Energy - Idaho (DOE-ID) and INL are engaged in the development of benchmarks to support ongoing research activities. These benchmarks include reactors or assemblies that support Next Generation Nuclear Plant (NGNP) research, space nuclear Fission Surface Power System (FSPS) design validation, and currently operational facilities in Southeastern Idaho.

  1. Butte County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    6 Climate Zone Subtype B. Places in Butte County, Idaho Arco, Idaho Butte City, Idaho Moore, Idaho Retrieved from "http:en.openei.orgwindex.php?titleButteCounty,Idaho&oldi...

  2. Distributed Wind Energy in Idaho

    SciTech Connect (OSTI)

    Gardner, John; Ferguson, James; Ahmed-Zaid, Said; Johnson, Kathryn; Haynes, Todd; Bennett, Keith

    2009-01-31

    Project Objective: This project is a research and development program aimed at furthering distributed wind technology. In particular, this project addresses some of the barriers to distributed wind energy utilization in Idaho. Background: At its core, the technological challenge inherent in Wind Energy is the transformation of a highly variable form of energy to one which is compatible with the commercial power grid or another useful application. A major economic barrier to the success of distributed wind technology is the relatively high capital investment (and related long payback periods) associated with wind turbines. This project will carry out fundamental research and technology development to address both the technological and economic barriers. • Active drive train control holds the potential to improve the overall efficiency of a turbine system by allowing variable speed turbine operation while ensuring a tight control of generator shaft speed, thus greatly simplifying power conditioning. • Recent blade aerodynamic advancements have been focused on large, utility-scale wind turbine generators (WTGs) as opposed to smaller WTGs designed for distributed generation. Because of Reynolds Number considerations, blade designs do not scale well. Blades which are aerodynamically optimized for distributed-scale WTGs can potentially reduce the cost of electricity by increasing shaft-torque in a given wind speed. • Grid-connected electric generators typically operate at a fixed speed. If a generator were able to economically operate at multiple speeds, it could potentially convert more of the wind’s energy to electricity, thus reducing the cost of electricity. This research directly supports the stated goal of the Wind and Hydropower Technologies Program for Distributed Wind Energy Technology: By 2007, reduce the cost of electricity from distributed wind systems to 10 to 15 cents/kWh in Class 3 wind resources, the same level that is currently achievable in Class 5 winds.

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  5. 2008 Department of Energy Idaho - Press Releases and Video Clips

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 12/18/08 Third Buried Waste Retrieval Project under way at DOE Idaho Site 12/17/08 Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment 12/01/08 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West 31 Kb 11/18/08 DOE hosts public hearings in Idaho Falls and around the nation to gather comments on its Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement

  6. EM Tackles Cleanup at Tonopah Test Range | Department of Energy

    Office of Environmental Management (EM)

    EM Tackles Cleanup at Tonopah Test Range EM Tackles Cleanup at Tonopah Test Range September 30, 2014 - 12:00pm Addthis Field technicians survey a shaker used in past cleanup ...

  7. Executing Legacy Clean-up at LANL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executing Legacy Clean-up at LANL Executing Legacy Clean-up at LANL Topic: DOE presented on the proposed new campaign approach to clean-up at Los Alamos National Laboratory, and ...

  8. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  9. Recovery Act Workers Complete Environmental Cleanup of Coal Ash...

    Office of Environmental Management (EM)

    Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a 17-acre ...

  10. Site Transition Process upon Completion of the Cleanup Mission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, ...

  11. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the ...

  12. EM's Defense Waste Processing Facility Achieves Waste Cleanup...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Waste Processing Facility Achieves Waste Cleanup Milestone EM's Defense Waste Processing Facility Achieves Waste Cleanup Milestone January 14, 2016 - 12:10pm Addthis The...

  13. 2015 DOE National Cleanup Workshop | Department of Energy

    Energy Savers [EERE]

    2015 DOE National Cleanup Workshop 2015 DOE National Cleanup Workshop Addthis 1 of 5 2 of 5 3 of 5 4 of 5 5 of 5

  14. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal of Contaminants - University of Idaho SECTION B. Project Description The University of Idaho proposes to evaluate nanostructured sorbent materials for their effectiveness in removing and immobilizing contaminants for the off-gas treatment from the used nuclear fuel recycling operations. Specific objectives of the project are: 1. To synthesize and characterize various nanosorbents for the

  15. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    Office of Environmental Management (EM)

    Page 1 of 1 CX Posting No.: DOE-ID-13-044 SECTION A. Project Title: Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal of Contaminants - University of Idaho SECTION B. Project Description The University of Idaho proposes to evaluate nanostructured sorbent materials for their effectiveness in removing and immobilizing contaminants for the off-gas treatment from the used nuclear fuel recycling operations. Specific objectives of the project are: 1. To synthesize and

  16. SBOT IDAHO IDAHO LAB POC Stacey Francis Telephone

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IDAHO IDAHO LAB POC Stacey Francis Telephone (208) 526-8564 Email stacey.francis@inl.gov CONSTRUCTION Industrial Building Construction 236210 All Other Specialty Trade Contractors 238990 GOODS Motor Vehicle Supplies and New Parts Merchant Wholesalers 423120 Tire and Tube Merchant Wholesalers 423130 Office Equipment Merchant Wholesalers 423420 Other Commercial Equipment Merchant Wholesalers 423440 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and

  17. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    SciTech Connect (OSTI)

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  18. THE IDAHO NATIONAL LABORATORY BERYLLIUM TECHNOLOGY UPDATE

    SciTech Connect (OSTI)

    Glen R. Longhurst

    2007-12-01

    A Beryllium Technology Update meeting was held at the Idaho National Laboratory on July 18, 2007. Participants came from the U.S., Japan, and Russia. There were two main objectives of this meeting. One was a discussion of current technologies for beryllium in fission reactors, particularly the Advanced Test Reactor and the Japan Materials Test Reactor, and prospects for material availability in the coming years. The second objective of the meeting was a discussion of a project of the International Science and Technology Center regarding treatment of irradiated beryllium for disposal. This paper highlights discussions held during that meeting and major conclusions reached

  19. Raft River Idaho Magnetotelluric Data

    SciTech Connect (OSTI)

    Gregory Nash

    2015-05-13

    Raw magnetotelluric (MT) data covering the geothermal system at Raft River, Idaho. The data was acquired by Quantec Geoscience. This is a zipped file containing .edi raw MT data files.

  20. Nevada Waste Leaves Idaho Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Media Contacts: Danielle Miller, 208-526-5709 Brad Bugger, 208-526-0833 For Immediate Release: Date: March 02, 2010 Nevada Waste Leaves Idaho Facility (Note: This is a reissue of...

  1. Idaho National Lab Impact Tour

    Broader source: Energy.gov [DOE]

    On June 30, David Danielson, Assistant Secretary for Energy Efficiency and Renewable Energy, and BETO Director Jonathan Male will be visiting Idaho National Laboratory to learn about their cutting-edge bioenergy research.

  2. Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at the Cold Test Pit South, Idaho National Engineering and Environmental Laboratory 2010 ARRA Newsletters Preliminary Notice of Violation, Bechtel BWXT Idaho, LLC - EA-2004-01

  3. Idaho Geological Survey and University of Idaho Explore for Geothermal Energy

    Broader source: Energy.gov [DOE]

    The University of Idaho's Idaho Geological Survey recently drilled new wells in southeastern Idaho to provide the most accurate assessment of high-temperature geothermal energy potential in the region.

  4. E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory E-IDR (Inventory Disclosure Record) PIA, Idaho ...

  5. Voluntary Protection Program Onsite Review, Idaho National Laboratory...

    Energy Savers [EERE]

    Idaho National Laboratory - October 2009 Voluntary Protection Program Onsite Review, Idaho National Laboratory - October 2009 October 2009 Evaluation to determine whether the Idaho...

  6. Inside Idaho: Interactive Numeric and Spatial Information Data...

    Open Energy Info (EERE)

    GraphicMapChart Abstract Idaho GIS Clearinghouse Organization Idaho Geospatial Office Published Idaho Geospatial Office, Date Not Provided DOI Not Provided Check for DOI...

  7. DOE-Idaho's Packaging and Transportation Perspective | Department...

    Office of Environmental Management (EM)

    DOE-Idaho's Packaging and Transportation Perspective DOE-Idaho's Packaging and Transportation Perspective Presented by Richard Provencher, Manager for the DOE Idaho Operations...

  8. Idaho Business Opportunity Conference 2016 | Department of Energy

    Energy Savers [EERE]

    Idaho Business Opportunity Conference 2016 Idaho Business Opportunity Conference 2016 March 24, 2016 9:00AM to 5:00PM MDT 2016 Idaho Business Opportunity Conference

  9. 34th Tritium Focus Group Meeting, Idaho National Laboratory, Idaho Falls,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 23-25, 2014 | Department of Energy 4th Tritium Focus Group Meeting, Idaho National Laboratory, Idaho Falls, September 23-25, 2014 34th Tritium Focus Group Meeting, Idaho National Laboratory, Idaho Falls, September 23-25, 2014 34th Tritium Focus Group Meeting, Idaho National Laboratory, Idaho Falls, September 23-25, 2014 The Tritium Focus Group (TFG), is a long standing DOE Working Group, whose purpose is to promote cost-effective improvements in tritium safety, handling,

  10. Hazardous waste cleanup: the preliminaries

    SciTech Connect (OSTI)

    Amos, K.

    1985-08-01

    This article describes the lengthiness and cost of the preliminary steps in a hazardous waste cleanup. The article describes the S-Area lawsuit, an area near Niagara Falls, New York which was an inactive chemical dump. Contaminated sludge was found at a nearby water treatment plant and was traced back to S-Area. In the past five years, S-Area negotiations have cost the U.S. Environmental Protection Agency two million dollars for advice on how work should proceed for the plant and the landfill. This lawsuit was one of the first in the U.S. against a chemical company for endangering the public through unsound waste disposal practices. Negotiation was selected instead of a trial for several reasons which are outlined. S-Area may serve as a model for other such settlements, as it provides for a flexible plan, open to consideration of alternate technologies that may be developed in the future. It contains a phased approach to both defining and evaluating existing problems, then suggesting remedies. It also requires monitoring for at least 35 years or until no danger remains.

  11. CRAD, Occupational Safety & Health- Idaho MF-628 Drum Treatment Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Occupational Safety and Industrial Hygiene programs at the MF-628 Drum Treatment Facility at the Idaho National Laboratory Advanced Mixed Waste Treatment Project.

  12. EM Completes Project to Maintain Water Quality of Spent Nuclear...

    Energy Savers [EERE]

    Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site ...

  13. Biogas Impurities and Cleanup for Fuel Cells

    Broader source: Energy.gov (indexed) [DOE]

    Biogas Impurities and Cleanup for Fuel Cells Dennis Papadias and Shabbir Ahmed Argonne National Laboratory Presented at the Biogas and Fuel Cells Workshop Golden, CO June 11-13,...

  14. EA-0843: Idaho National Engineering Laboratory Low-Level and Mixed Waste Processing, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to (1) reduce the volume of the U.S. Department of Energy's Idaho National Engineering Laboratory's (INEL) generated low-level waste (LLW)...

  15. Site Transition Process Upon Cleanup Completion | Department of Energy

    Energy Savers [EERE]

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup Completion More Documents & Publications Recommendation 198: Establish a site transition process Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites EM SSAB Conference Calls - January 27, 2011

  16. 2014 House Nuclear Cleanup Caucus Oak Ridge

    Office of Environmental Management (EM)

    August 16, 2014 Sue Cange Acting Manager Oak Ridge Office of Environmental Management Oak Ridge Site Specific Advisory Board Annual Planning Meeting www.energy.gov/EM 2 Complete the cleanup of the Oak Ridge Reservation to: * Protect the region's health and environment * Make clean land available for future use * Ensure Department of Energy's ongoing vital missions OREM Mission www.energy.gov/EM 3 Work is organized by Cleanup Portfolios: * East Tennessee Technology Park (ETTP) * Oak Ridge

  17. Cleanup Progress Report - 2011 | Department of Energy

    Energy Savers [EERE]

    1 Cleanup Progress Report - 2011 In this issue, learn about EM's accomplishments in 2011 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park DOE Selects New Cleanup Contractor K-25 East Wing Demolition Begins K-33 Building Demolished Oak Ridge National Laboratory 2000 Complex Demolition Completed Bethel Valley Burial Ground Remediation Completed Bethel Valley Groundwater

  18. Los Alamos National Laboratory names cleanup subcontractors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup subcontractors named Los Alamos National Laboratory names cleanup subcontractors The three companies are Los Alamos Technical Associates (LATA), Portage Inc., and ARSEC Environmental, LLC (ARSEC). August 14, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos

  19. Portsmouth Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Progress Portsmouth Cleanup Progress Environmental impacts occurred at the Portsmouth Gaseous Diffusion Plant during operations from 1954-2001. Remediation efforts began well before the uranium enrichment operations ceased in 2001. In 1989 the U.S. Department of Energy established the Office of Environmental Management for the purpose of remediating facilities within the nation's nuclear weapons complex. Various remediation efforts have taken place at the Portsmouth Site since 1989, to

  20. Portsmouth Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Portsmouth Environmental Cleanup As part of deactivation efforts, process gas equipment is being removed from gaseous diffusion plant buildings. As part of deactivation efforts, process gas equipment is being removed from gaseous diffusion plant buildings. Decades of uranium enrichment and support activities at Portsmouth required the use of a number of typical and special industrial chemicals and materials. Gaseous Diffusion Plant operations generated hazardous, radioactive, mixed (both

  1. Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments

    Office of Environmental Management (EM)

    | Department of Energy Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments December 24, 2013 - 12:00pm Addthis A high-reach shear removes debris from the tallest structure of the C-340 complex at Paducah. Watch a video of this work here. The 120-foot-high Metals Plant was the tallest building at the Paducah site and encompassed about 1.5 million cubic feet, the volume of a football field roughly

  2. Microsoft PowerPoint - News Flash_Idaho AMWTP_110509

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Date U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery Environmental Management Recovery Act Keeping You in the Know November 5, 2009 Idaho's Advanced Mixed Waste Treatment Project Completes Recovery Act Goals U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery With funds provided by the American Recovery and Reinvestment Act (Recovery Act) the U.S. Department of Energy's Idaho Site is shipping

  3. Big Energy Savings for Small Idaho City | Department of Energy

    Energy Savers [EERE]

    Energy Savings for Small Idaho City Big Energy Savings for Small Idaho City September 30, 2010 - 4:28pm Addthis Renovations to Pinehurst’s City Hall are saving residents of this bedroom community $1,335 a year | Photo courtesy of Pinehurst Renovations to Pinehurst's City Hall are saving residents of this bedroom community $1,335 a year | Photo courtesy of Pinehurst Kevin Craft What are the key facts? Renovations to city hall will save Pinehurst, Id. $1,335 a year. The project is providing

  4. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  5. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Broader source: Energy.gov [DOE]

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  6. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  7. Slide 1

    Energy Savers [EERE]

    2012 Congressional Nuclear Cleanup Caucus Idaho Cleanup Project March 28, 2012 James R. Cooper Manager for Environmental Management Idaho Operations Office Richard Raaz, Idaho Treatment Group Thomas J. Dieter, CH2M-WG Idaho 2 The Idaho Site Originally established in 1949 as a national reactor testing base; 52 "first-of-a-kind" test reactors have been constructed at the site. * 890 square miles * Cleanup workforce of ~1,700 * The Idaho Site mission is divided into three contracts -

  8. Upper Los Alamos Canyon Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project entails collecting soil and rock samples using the most efficient and least-invasive methods practicable defining the nature and extent of any residual contamination...

  9. Microsoft Word - DOE-ID-13-031 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31 SECTION A. Project Title: Doubling The Life of Concrete Structures - University of Idaho SECTION B. Project Description The University of Idaho proposes to study the transport properties of concrete. Objectives include developing methods for doubling the service life of concrete structures through the use of nano-SiO2, studying the effect of temperature load and temperature cycling on conductive pathways by electrochemical methods, studying the combined effect of temperature, moisture, and

  10. Microsoft Word - DOE-ID-13-081 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Innovative Elution Processes for Recovering Uranium and Transition Metals from Amidoxime- based Sorbents - University of Idaho SECTION B. Project Description The University of Idaho, in collaboration with Oak Ridge National Laboratory, proposes to develop an efficient, economic, and environmentally sustainable technique for sequestering uranium from seawater. Objectives include: 1. Study durability of the amidoxime-based sorbent during carbonate-H 2 O 2 elution of

  11. Microsoft Word - DOE-ID-15-063 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Characterization of Creep-Fatigue Crack Growth in Alloy 709 and Prediction of Service Lives in Nuclear Reactor Components - University of Idaho SECTION B. Project Description The University of Idaho proposes 1) to measure and report the creep-fatigue crack growth rates in Alloy 709 under various creep- fatigue loading in accelerated test conditions and to use this knowledge to predict the extended service life of structural components, 2) to measure and report the

  12. Protecting Recovery Act Cleanup Site During Massive Wildfire

    Office of Environmental Management (EM)

    July 13, 2011 Protecting Recovery Act Cleanup Site During Massive Wildfire LOS ALAMOS, N.M. - Effective safety procedures in place at Los Alamos National Laboratory would have provided protections in the event that the raging Las Conchas fire had spread to the site of an American Recovery and Reinvestment Act project. "Our procedures not only placed the waste excavation site, Materials Disposal Area B (MDA-B), into a safe posture so it was well protected during the fire, but also allowed us

  13. Project Reports for Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  14. Kootenai County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Energy Companies in Kootenai County, Idaho Coeur d Alene Fiber Fuels Inc aka Atlas Places in Kootenai County, Idaho Athol, Idaho Coeur d'Alene, Idaho Dalton Gardens,...

  15. Nez Perce Tribe- 2011 Project

    Broader source: Energy.gov [DOE]

    The project will implement energy efficiency measures that include updates of several different elements in key Nez Perce tribal buildings in the town of Lapwai, Idaho.

  16. Occupational Medical Surveillance System (OMSS) PIA, Idaho National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (OMSS) PIA, Idaho National Laboratory More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System ...

  17. Enforcement Letter, Bechtel BWXT Idaho- March 31, 2006

    Broader source: Energy.gov [DOE]

    Issued to Bechtel BWXT Idaho, LLC, related to External Radiation Dosimetry Accreditation Issues at the Idaho National Laboratory

  18. RAPID/Overview/Geothermal/Exploration/Idaho | Open Energy Information

    Open Energy Info (EERE)

    Idaho < RAPID | Overview | Geothermal | Exploration(Redirected from RAPIDAtlasGeothermalExplorationIdaho) Redirect page Jump to: navigation, search REDIRECT...

  19. Occupational Medical Surveillance System (OMSS) PIA, Idaho National...

    Energy Savers [EERE]

    (OMSS) PIA, Idaho National Laboratory More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  20. Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup | Department

    Energy Savers [EERE]

    of Energy Whey powder is used to reduce pH levels in the contaminated area. Whey powder is used to reduce pH levels in the contaminated area. This well is used to inject the protein source — whey powder — for microorganisms in an in situ bio- remediation process. This well is used to inject the protein source - whey powder - for microorganisms in an in situ bio- remediation process. Whey powder is used to reduce pH levels in the contaminated area. This well is used to inject the

  1. Idaho State Historical Society | Open Energy Information

    Open Energy Info (EERE)

    http:history.idaho.gov State Cultural Considerations Contact 2 Contacts.png Glenda King 208.334.3847 x106 http:history.idaho.gov Retrieved from "http:en.openei.orgw...

  2. Idaho Power- Easy Upgrades Efficiency Incentive Program

    Broader source: Energy.gov [DOE]

    Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to upgrade to more efficient equipment in their facilities. The utility provides rebates for lighting...

  3. Idaho National Laboratory Radiological Response Training Range...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy, Idaho Operations Office, 1955 Fremont Avenue, Idaho Falls, ID 83415-1170, or emailed to: RRTREA@id.doe.gov. DOE-ID-10-010 Editorial Date August 4...

  4. Idaho National Engineering & Environmental Laboratory Consent...

    Office of Environmental Management (EM)

    Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Modify the language of Section 6.20.E.1 of the Consent Order Parties DOE; US EPA; Idaho Department of...

  5. Mixed and low-level waste treatment project: Appendix C, Health and safety criteria for the mixed and low-level waste treatment facility at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Neupauer, R.M.; Thurmond, S.M.

    1992-09-01

    This report describes health and safety concerns associated with the Mixed and Low-level Waste Treatment Facility at the Idaho National Engineering Laboratory. Various hazards are described such as fire, electrical, explosions, reactivity, temperature, and radiation hazards, as well as the potential for accidental spills, exposure to toxic materials, and other general safety concerns.

  6. Mixed and low-level waste treatment project: Appendix C, Health and safety criteria for the mixed and low-level waste treatment facility at the Idaho National Engineering Laboratory. Part 1, Waste streams and treatment technologies

    SciTech Connect (OSTI)

    Neupauer, R.M.; Thurmond, S.M.

    1992-09-01

    This report describes health and safety concerns associated with the Mixed and Low-level Waste Treatment Facility at the Idaho National Engineering Laboratory. Various hazards are described such as fire, electrical, explosions, reactivity, temperature, and radiation hazards, as well as the potential for accidental spills, exposure to toxic materials, and other general safety concerns.

  7. Idaho/Incentives | Open Energy Information

    Open Energy Info (EERE)

    No Avista Utilities (Electric) - Commercial Lighting Energy Efficiency Program (Idaho) Utility Rebate Program No Avista Utilities (Electric) - Commercial Energy Efficiency...

  8. DOE-Idaho's Packaging and Transportation Perspective

    Office of Environmental Management (EM)

    Idaho's Packaging and T t ti P ti Transportation Perspective Richard Provencher Manager DOE Idaho Operations Office DOE Idaho Operations Office Presented to the DOE National Transportation Stakeholders Forum Stakeholders Forum May 12, 2011 DOE's Idaho site ships and receives a wide variety of radioactive materials 2 Engineering Test Reactor vessel excavated, transported across the site and disposed 3 Navy SNF moved from wet to dry storage storage 4 5 Left: Contact-handled TRU shipments Right: A

  9. IWTU at Idaho Fact Sheet

    Energy Savers [EERE]

    Waste Treatment Facility Designed to Treat Liquid Radioactive Waste at DOE's Idaho Site The Integrated Waste Treatment Unit is a newly constructed facility that is designed to treat 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility located at DOE's Idaho Site. An exterior view of the Integrated Waste Treatment Unit IWTU is a 53,000-square foot facility that will use a steam-reforming technology to heat up the

  10. Department of Energy Idaho - Strategic Partnership Projects ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Specialist Sara Twining (208) 526-5987 wfo@id.doe.gov Office of Chief Counsel Stewart Forbes (208) 526-3715 Budget Services Division Laurie Acosta Peterson (208) 526-0459...

  11. Managing Large Capital Projects | Department of Energy

    Energy Savers [EERE]

    Managing Large Capital Projects Managing Large Capital Projects Presentation from the 2015 DOE National Cleanup Workshop by Ken Picha, Deputy Assistant Secretary for Tank Waste and Nuclear Material, Office of Environmental Management. PDF icon Managing Large Capital Projects More Documents & Publications Waste Treatment Plant Project Construction of Salt Waste Processing Facility (SWPF) 2013 Congressional Nuclear Cleanup Caucus Briefings

  12. After More Than 20 Years Operating, Hanford’s Soil Vapor Extraction Project Nears Completion

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Hanford workers are fast approaching the successful completion of a long-term cleanup project.

  13. Groundwater, Legacy Soil Cleanup and Flood Recovery Top Lab’s Accomplishments

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – Top 2014 accomplishments of the Los Alamos National Laboratory’s EM-supported Environmental Programs included remediation of chromium in groundwater, completion of a legacy contaminant soil cleanup project, and rapid recovery from a 1,000-year rain event that caused widespread flooding.

  14. EA-1867: Scale-up of High-Temperature Syngas Cleanup Technology, Polk County, Florida

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTIs high-temperature syngas cleanup and carbon capture and sequestration technologies.

  15. Idaho National Engineering Laboratory: Annual report, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    The INEL underwent a year of transition in 1986. Success with new business initiatives, the prospects of even better things to come, and increased national recognition provided the INEL with a glimpse of its promising and exciting future. Among the highlights were: selection of the INEL as the preferred site for the Special Isotope Separation Facility (SIS); the first shipments of core debris from the Three Mile Island Unit 2 reactor to the INEL; dedication of three new facilities - the Fluorinel Dissolution Process, the Remote Analytical Laboratory, and the Stored Waste Experimental Pilot Plant; groundbreaking for the Fuel Processing Restoration Facility; and the first IR-100 award won by the INEL, given for an innovative machine vision system. The INEL has been assigned project management responsibility for the SDI Office-sponsored Multimegawatt Space Reactor and the Air Force-sponsored Multimegawatt Terrestrial Power Plant Project. New Department of Defense initiatives have been realized in projects involving development of prototype defense electronics systems, materials research, and hazardous waste technology. While some of our major reactor safety research programs have been completed, the INEL continues as a leader in advanced reactor technologies development. In April, successful tests were conducted for the development of the Integral Fast Reactor. Other 1986 highlights included the INEL's increased support to the Office of Civilian Radioactive Waste Management for complying with the Nuclear Waste Policy Act of 1982. Major INEL activities included managing a cask procurement program, demonstrating fuel assembly consolidation, and testing spent fuel storage casks. In addition, the INEL supplied the Tennessee Valley Authority with management and personnel experienced in reactor technology, increased basic research programs at the Idaho Research Center, and made numerous outreach efforts to assist the economies of Idaho communities.

  16. Hanford Site Cleanup Challenges and Opportunities for Science and Technology--A Strategic Assessment

    SciTech Connect (OSTI)

    Wood, Thomas W.; Johnson, Wayne L.; Kreid, Dennis K.; Walton, Terry L.

    2001-02-01

    The sheer expanse of the Hanford Site, the inherent hazards associated with the significant inventory of nuclear materials and wastes, the large number of aging contaminated facilities, the diverse nature and extent of environmental contamination, and the proximity to the Columbia River make Hanford perhaps the world's largest and most complex environmental cleanup project. It is not possible to address the more complex elements of this enormous challenge in a cost-effective manner without strategic investments in science and technology. Success requires vigorous and sustained efforts to enhance the science and technology basis, develop and deploy innovative solutions, and provide firm scientific bases to support site cleanup and closure decisions at Hanford.

  17. SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS

    Office of Scientific and Technical Information (OSTI)

    PRODUCTION WITH ILLINOIS COAL (Other) | SciTech Connect Other: SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS PRODUCTION WITH ILLINOIS COAL Citation Details In-Document Search Title: SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS PRODUCTION WITH ILLINOIS COAL The goal of this project was to evaluate the performance of Illinois No. 6 coal blended with biomass in a small-scale entrained-flow gasifier and demonstrate the production of liquid fuels under three

  18. Moab Marks 6-Million-Ton Cleanup Milestone | Department of Energy

    Office of Environmental Management (EM)

    Moab Marks 6-Million-Ton Cleanup Milestone Moab Marks 6-Million-Ton Cleanup Milestone June 20, 2013 - 12:00pm Addthis At Tuesday's Grand County Council meeting in Utah, Moab Federal Project Director Donald Metzler, center, moves a piece from a plaque representing Moab’s uranium mill tailings pile to a plaque representing the disposal cell in recognition of the site achieving a milestone by shipping 6 million tons of the tailings. Grand County Council Chair Gene Ciarus is on the left and

  19. DOE's Idaho National Lab Issues Request for Proposals for Engineering and

    Energy Savers [EERE]

    Design on NGNP | Department of Energy Idaho National Lab Issues Request for Proposals for Engineering and Design on NGNP DOE's Idaho National Lab Issues Request for Proposals for Engineering and Design on NGNP July 26, 2006 - 4:37pm Addthis Services Will Guide R&D on Next Generation Reactor WASHINGTON, DC. - In an important step forward for the Next Generation Nuclear Plant (NGNP) project, the U.S. Department of Energy's Idaho National Laboratory today issued a Request for Proposals

  20. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....