National Library of Energy BETA

Sample records for id project size

  1. Yucca Mountain Project Integrated Data System (IDS); Final report, October 1, 1989--December 31, 1990

    SciTech Connect (OSTI)

    1991-05-23

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last version supplied (July 27, 1990) is included in this document.

  2. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or modification of air conditioning systems

  3. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, Rev 1 MSA Annual Categorical Exclusion for Relocation of Buildings under 10 CFR 1021, Subpart D, Appendix B, Bl.22 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform relocation of buildings (including, but not limited to, trailers and

  4. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, Rev 1 MSA Annual Categorical Exclusion for Traffic Flow Adjustments under 10 CFR 1021, Subpart D, Appendix B, Bl.32 for Calendar Year 2014 II. Project Description and location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform traffic flow adjustments to existing roads (including, but not limited

  5. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, Rev 1 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental

  6. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or modification of air conditioning systems

  7. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Asbestos Removal under 10 CFR 1021, Subpart D, Appendix B, Bl.l6 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors remove asbestos-containing materials (ACM) from buildings in accordance with applicable

  8. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, Rev 2 MSA Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.31 for Calendar Year 2015. 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or relocation and operation of

  9. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Oil Spill Cleanup under 10 CFR 1021, Subpart D, Appendix B, B5.6 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA} and its subcontractors perform removal of oil and contaminated materials recovered in oil spill cleanup operations and

  10. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    42 Radiological Survey Activities in the 600 Area of the Hanford Site Supporting Land Conveyance II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): The U.S. Department of Energy, Richland Operations (DOE-RL) proposes to conduct radiological surveys of a portion of the 600 Area of the Hanford Site. The surveys are needed to

  11. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, Rev 2 MSA Annual Categorical Exclusion for Training Exercises and Simulations under 10 CFR 1021, Subpart D, Appendix B, Bl.2 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform training exercises and simulations (including, but not limited

  12. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, 81.3 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance activities and custodial services for

  13. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, Rev 1 MSA Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.31 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or relocation and operation of

  14. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Drop-Off, Collection, and Transfer Facilities for Recyclable Materials under 10 CFR 1021, Subpart D, Appendix B, Bl.35 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification,

  15. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility

  16. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Rev 1 MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or water, demonstrate potential

  17. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, Rev 1 MSA Annual Categorical Exclusion for Facilities to Store Packaged Hazardous Waste for 90 Days or Less under 10 CFR 1021, Subpart D, Appendix B, B6.4 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification,

  18. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, Rev 2 MSA Annual Categorical Exclusion for Support Buildings under 10 CFR 1021, Subpart D, Appendix B, Bl.l5 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction or modification, and operation of support buildings and

  19. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility

  20. PROJECT NAME/ID",,,"Jobs figures to report",,"October 2010 Report",,"January 201

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT NAME/ID",,,"Jobs figures to report",,"October 2010 Report",,"January 2011 Report",,"April 2011 Report",,"July 2011 Report",,"October 2011 Report",,"January 2012 Report",,"April 2012 Report" ,,,,"Recovery Act FTEs are reported to OMB quarterly via FederalReporting.gov. Recovery Act hours worked are reported quarterly to DOE via PAGE.",,"To OMB (FTEs)",,"To OMB

  1. Data ID Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ID Service First DOI for a DOE dataset was minted by OSTI and registered with DataCite on 8/10/2011 from the DOE Atmospheric Radiation Measurement (ARM) Climate Research Facility at Oak Ridge National Laboratory http://dx.doi.org/10.5439/1021460 Disseminate Our Results: "Our success should be measured not when a project is completed or an experiment concluded, but when scientifc and technical information is disseminated. Beyond broad availability of technical reports, e-prints and

  2. Blind Modal ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects » Blind Modal ID Blind separation of high-resolution vibration modes High-resolution video camera measurement of the structural vibration (the top video) could be separated into individual, monotone, vibration modes, which enable high-resolution visualization and analysis of structural dynamics. Contact Yongchao Yang (832) 335-3003 Email David Mascarenas dmascarenas@lanl.gov (505) 665-0881 Original video = Mode 1 - 6.34 Hz + Mode 2 - 17.96 Hz + Mode 3 - 25.89 Hz (higher

  3. Microsoft Word - DOE-ID-INL-12-015.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15 SECTION A. Project Title: Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement SECTION B. Project Description: The purpose of this project is to permanently close and remove the Materials and Fuels Complex (MFC) 4,000 gallon bio-diesel underground storage tank (UST) [Site ID# 7230/Facility ID # 6-120614/Tank ID # 99ANL00013] and remove the 1,000 gallon E-85 aboveground storage tank (AST) [Site ID# 7230/Facility ID# 6-120614/Tank ID# 05MFC00035] and replace the two

  4. 2011 Annual Planning Summary for Idaho Operations Office (ID) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Idaho Operations Office (ID) 2011 Annual Planning Summary for Idaho Operations Office (ID) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management). PDF icon 2011 Annual Planning Summary for Idaho Operations Office (ID) More Documents & Publications 2010 Annual Planning Summary for Idaho Operations Office (ID) 2012 Annual Planning Summary for SLAC Site Office

  5. Document ID Number: RL-721

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ---------------------------------------------------------- Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings,

  6. 4-ID beamline layout

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sector 4 beamline layout Overview Sector 4 uses a canted undulator straight section to operate two beamlines The 4-ID-C beamline operates between 500 and 3000 eV while the 4-ID-D...

  7. Badging, Real ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office » Badging, Real ID Badging, Real ID Effective Nov. 3, 2014, the Lab will implement requirements of the REAL ID Act. Contact Badge Office (505) 667-6901 Email Badge requirements US citizen employees must present a photo ID and proof of US citizenship. See Security Smart on Proof of United States Citizenship for the Badge Office (pdf). Foreign national guests and employees must have an approved visit and present a valid passport and documentation of US legal status and work authorizations.

  8. Department of Energy Idaho - Inside DOE-ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inside ID Inside Idaho Operations Office (DOE-ID) DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) DOE-ID Agreement in Principle Organization Chart Employment Opportunities New Employee Orientation EOD Checklist - 68 KB EOD Forms - 261 KB DOE/Tribal Agreement in Principle Strategic Partnership Projects (formerly WFO) Idaho Site Contractor Timeline - 3.7 MB ID@Work Introduces some of the DOE-ID employees and the jobs they perform. Last Updated: 05/21/2015

  9. Beamline 29-ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Milestones IEX Advisory Committees FDR Beamline Information RSXS ARPES APS Ring Status Current APS Schedule Intermediate Energy X-Rays (29-ID): The Intermediate Energy...

  10. RAPID/Roadmap/3-ID-b | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Land Access Overview (3-ID-b) If a project is...

  11. II.CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    1 II.CONTRACT ID CODE ~AGE 1 of AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT PAGES AC 5. PROJECT NO. (If applicable) 3. EFFECTNE DATE 2. AMENDMENTfMODIFICA TION NO. 4. REQUISITIONIPURCHASE REQ. NO. See Block 16c. NOPR 7. ADMINISTERED BY (If other than Item 6) CODE 05008 6. ISSUED BY CODE 05008 U.S. Department of Energy National Nuclear Security Administration U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 P.O. Box 2050 Oak Ridge, TN

  12. Microsoft Word - DOE-ID-INL-13-007.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data

  13. Real ID Act in brief

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visitors » Badging, Badge Office » Real ID Act in brief Real ID Act in brief Effective Nov. 3, 2014, the Lab will implement requirements of the REAL ID Act. Contact Badge Office (505) 667-6901 Email REAL ID Act in brief REAL ID is a coordinated effort by the states and the Federal Government to improve the reliability and accuracy of state-issued identification documents, which should inhibit terrorists' ability to evade detection by using fraudulent identification. REAL ID implements a 9/11

  14. 4-ID-D optics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-ID-D Beamline Optics A schetch of the major optical components for beam line 4-ID-D are shown above. All these components located in the B-station upstream from the D...

  15. T ID CODE I

    National Nuclear Security Administration (NNSA)

    T ID CODE I DE- , I AC52- AMENDMENT OF SOLICITATION/MODIFICATlON OF CONTRACT I. CONTRAC I 06NA25396 I Los Alamos National Security, LLC 4200 West Jernez Road Suite 400 Los Alamos, NM 87544 PAGE 1 OF 1 PAGES 2. AMENDMENTIMODIFICATION NO. A029 U.S. Department of Energy National Nuclear Security Administration Manager, Los Alamos Site Office 528 3sth Street Los Alamos, NM 87544 I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 10A. MODIFICATION OF

  16. 5 Super-Sized Solar Projects Transforming the Clean Energy Landscape |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Super-Sized Solar Projects Transforming the Clean Energy Landscape 5 Super-Sized Solar Projects Transforming the Clean Energy Landscape April 8, 2013 - 4:00pm Addthis The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo County. | Photo courtesy of SunPower. The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo

  17. Microsoft Word - DOE-ID-INL-11-011.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: MFC-752 Analytical Laboratory Seismic Upgrade SECTION B. Project Description: The Department of Energy, Idaho Operations Office (DOE-ID) conducted a review of the nuclear safety practices on the Materials and Fuels Complex (MFC) documented safety analyses (DSAs) in 2005 during transition of operating contractors. The DOE-ID assessment concluded that the MFC DSAs had potential inadequacies in following the safe harbor methodology of the nuclear safety rule. That review

  18. Microsoft Word - DOE-ID-INL-13-001.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEPA-CX DETERMINATION Idaho National Laboratory Page 1 of 1 CX Posting No.: DOE-ID-INL-13-001 SECTION A. Project Title: INL Research (Technical) Library Lease Termination SECTION B. Project Description: The proposed activity will terminate the current lease of the INLTechnical Library (IF-618, University Place) at 1776 Science Center Drive in Idaho Falls, ID on or about February 28, 2013 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur on or

  19. DHSIsotopeID

    Energy Science and Technology Software Center (OSTI)

    2007-12-18

    DHSIsotopeID is an application designed to read and analyze radiation measurement files taken by radiation measurement files taken by radiation portal monitors, and in particular, by the advanced spectroscopic portals. It requires that the data files be in the N42 file format, compliant with the interface control documents for DNDO radiation measurement files. It carries out an automated analysis to determine which isotopes are present in the spectra, and then presents the results in graphicalmore » form to the user. It also enables further post-processing and analysis, for example by performing further analysis on selected regions of interest of the spectrum, as designated by the user via the graphical interface.« less

  20. Microsoft Word - DOE-ID-INL-14-044.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DETERMINATIO Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-14-044 SECTION A. Project Title: Materials and Fuels Complex (MFC)-752 Analytical Laboratory Water System Upgrade Project SECTION B. Project Description: The proposed project will remove and replace the current demineralized water system and backflow preventers with an air-gap system. The purpose of the project is to comply with Environmental Support and Services Technical Interpretation (ES&S-TI)-027, Idaho

  1. APS Beamline 6-ID-B,C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-ID-B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the...

  2. APS Beamline 6-ID-D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the...

  3. DOEDataID_24X30poster112515

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    home/doe-data-id-service

  4. Microsoft Word - DOE-ID-INL-14-046.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE0ID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-14-046 SECTION A. Project Title: Materials and Fuel Complex (MFC)-752 Analytical Laboratory (AL) Fire Suppression System SECTION B. Project Description: The project scope consists of adding fire water suppression capability to MFC-752AL maintenance cells RM-A116, and to the basement clean room located by room B-30. In addition to the enhanced fire suppression capability, appropriate fire detection will

  5. DOE-ID Twitter Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    what's going on at DOE-Idaho? Follow DOE-ID public affairs supervisor Brad Bugger on Twitter at doeidbug. https:twitter.comdoeidbug Editorial Date May 9, 2911 By Brad Bugger...

  6. DOE/ID-Number

    Office of Environmental Management (EM)

    Public Preferences Related to Consent-Based Siting of Radioactive Waste Management Facilities for Storage and Disposal: Analyzing Variations over Time, Events, and Program Designs Prepared for US Department of Energy Nuclear Fuel Storage and Transportation Planning Project Hank C. Jenkins-Smith Carol L. Silva Kerry G. Herron Kuhika G. Ripberger Matthew Nowlin Joseph Ripberger Center for Risk and Crisis Management, University of Oklahoma Evaristo "Tito" Bonano Rob P. Rechard Sandia

  7. 11. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    1 PAGE 1 OF2 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE M191 See Block 16C 4. REQUISITION/PURCHASE I 5. PROJECT NO. (If applicable) REQ. NO. 6.ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 87185-5400 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security

  8. Microsoft Word - DOE-ID-INL-12-018.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner.

  9. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  10. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 2013 DOE-ID Operations Summary For the Period May 30, 2013 through June 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  11. Enterprise Assessments Operational Awareness Record for the Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project, OAR # EA-ID-2015-10-22

    Office of Environmental Management (EM)

    EA Operational Awareness Record Report Number: EA-ID-2015-10-22 Site: Idaho Site Subject: Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project Dates of Activity: 10/19/2015 - 10/22/2015 Report Preparer: Aleem E. Boatright Activity Description / Purpose: The Office of Environment, Safety and Health Assessments, within the Office of Enterprise Assessments (EA), performed a

  12. Microsoft Word - DOE-ID-10-003.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Agreement in Principle, INL Oversight, Idaho DEQ SECTION B. Project Description The state of Idaho receives funding from the Department of Energy to conduct independent oversight and monitoring of DOE-ID operations. Oversight activities and monitoring actions that will be conducted by the state of Idaho include general project management and administrative actions, data management, providing information to the public, emergency response coordination, and environmental

  13. Microsoft Word - DOE-ID-INL-12-003.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EC Document No.: DOE-ID-INL-12-003 SECTION A. Project Title: Auxiliary Canal Fill Project at Test Reactor Area (TRA)-670 SECTION B. Project Description: Although the ATR canal meets all design basis criteria, lessons learned following the earthquake and tsunami events at the Fukushima- Daiichi Nuclear Power Plant in March of 2011 indicate that an auxiliary water supply to the fuel storage canal with a fill connection located outside of the facility would have been valuable following the beyond

  14. Microsoft Word - DOE-ID-INL-13-006.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad.

  15. Microsoft Word - DOE-ID-INL-14-043.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DETERMNATION Idaho National Laboratory Page 1 of 1 CX Posting No.: DOE-ID-INL-14-043 SECTION A. Project Title: Idaho Falls (IF)-685 (Energy Systems Laboratory [ESL]) Battery Laboratory Panel Installation Project SECTION B. Project Description: . The IF-685 Battery Laboratory (Lab) researchers require the following actions: 1. Relocate existing 75 KVA transformer on top of new 150 KVA transformer Unistrut frame. 2. Provide and install a new 150 kilovolt-amp (kVA) transformer (XFMR-42) and

  16. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect (OSTI)

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  17. Data ID Service | DOE Data Explorer

    Office of Scientific and Technical Information (OSTI)

    DOE Data ID Service DOE Data ID Service Note 1: This section pertains to datasets, dataset records, and Digital Object Identifiers (DOIs). It is not related to the collection...

  18. APS Beamline 6-ID-B,C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray...

  19. APS Beamline 6-ID-D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science...

  20. Microsoft Word - DOE-ID-INL-12-028-1.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EC Document No.: DOE-ID-INL-12-028 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study SECTION B. Project Description: The National Oceanic and Atmospheric Administration (NOAA) Birch Creek Valley Wind Study would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). The project

  1. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    07, 2013 DOE-ID Operations Summary For the Period July 8, 2013 through July 28, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  2. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  3. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  4. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  6. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    23, 2015 Updated on April 28, 2015 DOE-ID Operations Summary For the Period September 30, 2014 through November 1, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle

  7. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period January 1, 2015 - January 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  8. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2015 DOE-ID Operations Summary For the Period February 1, 2015 - February 28, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  9. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2015 DOE-ID Operations Summary For the Period May 1, 2015 - May 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  10. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2, 2015 DOE-ID Operations Summary For the Period September 1, 2015 - September 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  11. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period August 1, 2015 - August 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  12. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 11, 2016 DOE-ID Operations Summary For the Period November 1, 2015 - November 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  13. Microsoft Word - DOE-ID-INL-10-020.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial

  14. Microsoft Word - DOE-ID-INL-11-009.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CS Posting No.: DOE-ID-INL-11-009 SECTION A. Project Title: International Way Building (IWB) Relocation SECTION B. Project Description: The International Way Building (IWB) is currently leased and near the end of the lease term. Relocating the programs and equipment currently housed in the IWB to underutilized facilties is needed to provide efficient operation of these programs in the National and Homeland Security (N&HS) directorate. Relocating the programs and equipment would also result

  15. Microsoft Word - DOE-ID-INL-12-006.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: International Way Office Building Lease Termination SECTION B. Project Description: The proposed activity will terminate the current lease of the International Way Office Building (IF-674, IWB) at 1690 International Way in Idaho Falls, ID on or about March 28, 2012 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur on or about March 26 to ensure the building is ready for turnover back to the owner. Approximate cost

  16. Microsoft Word - DOE-ID-INL-12-022.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate,

  17. Microsoft Word - DOE-ID-INL-13-025.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 EC Document No.: DOE-ID-INL-13-025 SECTION A. Project Title: Willow Creek Building Pedestrian Bridge Replacement SECTION B. Project Description: The purpose and need for the proposed action is to address safety concerns related to the pedestrian bridge across Willow Creek east of the main entrance to the Willow Creek Building (IF-616). The proposed action would remove the current pedestrian bridge and associated steel railing and would remove the existing concrete approaches on either side of

  18. Microsoft Word - DOE-ID-INL-13-026.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EC Document No.: DOE-ID-INL-13-026 SECTION A. Project Title: Relief Valve Test Stand Relocation SECTION B. Project Description: The scope of this modification is to relocate the existing relief valve test stand (RVTS) and associated high pressure air supply (skid mounted compressor and bottle rack dedicated to the RVTS) from the laydown area in Test Reactor Area (TRA)-670 to TRA-605. This modification will also include disconnecting the existing utilities from the RVTS in Advanced Test Reactor

  19. Microsoft Word - DOE-ID-INL-14-029.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DETERMINATIONS Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-14-029 SECTION A. Project Title: High-Efficiency Particulate Air (HEPA) Filter Installation in the Dry Transfer Cubicle Ventilation System SECTION B. Project Description: In order to minimize the risk of contamination from the Advanced Test Reactor (ATR) Dry Transfer Cubicle (DTC), a filtration system needs to be added to the ATR DTC ventilation system in the ductwork between the installed roughing filters and DTC

  20. Microsoft Word - DOE-ID-INL-15-045.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 CX Posting No.: DOE-ID-INL-15-045 SECTION A. Project Title: Army Medical Department (AMEDD) Radiological Dispersal Device/Improvised Nuclear Device (RDD/IND) Material Training Activities and Evaluations SECTION B. Project Description and Purpose: Rev 5 This Environmental Checklist (EC) incorporates and supercedes EC INL-12-087 (Overarching [OA] 17) and its revisions. The training exercises described in the original EC and Revisions 1 and 3 will be repeated during August 2015, including the use

  1. Microsoft Word - DOE-ID-INL-15-053.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    53 SECTION A. Project Title: Idaho National Laboratory (INL) Engineering Demonstration Facility (IEDF) Safety Shower Installation SECTION B. Project Description and Purpose: The proposed activity would install a safety shower on the northwest second floor of the Idaho National Laboratory (INL) Engineering Demonstration Facility (IEDF, Idaho Falls [IF]-657) in Idaho Falls, ID, for the purpose of supporting research and development activities in the area. In the event of use, the shower would

  2. Microsoft Word - DOE-ID-INL-16-001.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CX Posting No.: DOE-ID-INL-16-001 SECTION A. Project Title: Testing for Hot Fuel Examination Facility (HFEF) Gas Sample Assay and Recharge (GASR) Upgrade at Idaho National Laboratory Research Center (IRC). SECTION B. Project Description and Purpose: An upgrade of the GASR is necessary to ensure system reliability for future fuel examination campaigns. Work in IRC would include setup and completion of the out of cell testing of the redesigned GASR which is necessary prior to installation of the

  3. Microsoft Word - DOE-ID_INL-13-010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: North Boulevard Annex Lease Termination SECTION B. Project Description: The proposed activity would terminate the current lease of the North Boulevard Annex (IF-613) at 2095 North Boulevard in Idaho Falls, ID on or about July 31, 2013 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur prior to the lease termination to ensure the facility is ready for turnover back to the owner. Approximate cost associated with these

  4. Microsoft Word - DOE-ID-INL-12-016.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No.: DOE-ID-INL-12-016 SECTION A. Project Title: Reverse Osmosis System Removal SECTION B. Project Description: The project will remove a reverse osmosis water treatment system (FU-HA-101) from TAN 681 room 182. The system is out-of-service, with no intent of future use. Work will involve removal of the reverse osmosis system, and associated plumbing/piping and electrical lines and conduit. The project will clear the area of obstacles and tripping hazards associated with unused/unnecessary

  5. Microsoft Word - DOE-ID-INL-13-019.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: University Boulevard Water Meter Installation SECTION B. Project Description: This project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-681 (UB2), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, ID during the projected time period of August and September, 2013 at an approximate cost of $20 K - $95 K depending upon whether the work

  6. File:USDA-CE-Production-GIFmaps-ID.pdf | Open Energy Information

    Open Energy Info (EERE)

    ID.pdf Jump to: navigation, search File File history File usage Idaho Ethanol Plant Locations Size of this preview: 776 600 pixels. Full resolution (1,650 1,275 pixels,...

  7. Microsoft Word - DOE-ID-12-011 RESL XRF EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: DOE-ID/RESL Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development SECTION B. Project Description The DOE-ID Radiological & Environmental Sciences Laboratory (RESL) has a need for a complete state-of-the-art fully automated sequential wavelength-dispersive X-ray fluorescence (WD-XRF) spectrometer system. The WD-XRF spectrometer system will be primarily used for elemental analyses of soil, liquids (waters), air filters, unknown

  8. Microsoft Word - DOE-ID-INL-10-017.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID-INL-10-017 SECTION A. Project Title: ATR Complex Dial Room. SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Advanced Test Reactor Complex (ATR Complex) (formerly known as the Test Reactor Area [TRA]) in order to meet the U.S. Department of Energy Office of Nuclear Energy programmatic needs and to provide ongoing critical support at the Idaho National Laboratory (INL). The existing telecommunication and data systems located at the

  9. Microsoft Word - DOE-ID-INL-12-012.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately

  10. Microsoft Word - DOE-ID-INL-12-023.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to

  11. Microsoft Word - DOE-ID-INL-13-008.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap

  12. Microsoft Word - DOE-ID-INL-15-069.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DETERMIANTION Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-15-069 SECTION A. Project Title: Test Reactor Area (TRA)-653 Men's Shower Remodel SECTION B. Project Description and Purpose: The TRA-653 men's shower is in need of remodeling due to the age, loose or missing ceramic tile and the difficulty in cleaning it. The proposed project will remove the shower materials including ceramic tile (approximately 385 square feet), grout, and grout base and replace with a new non-slip

  13. U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    SciTech Connect (OSTI)

    Larsen, Peter; Goldman, Charles; Satchwell, Andrew

    2012-08-21

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a ?top-down? approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a ?bottom-up? analysis of a database of ~;;3,250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7percent per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25percent per year). We found that 2,484 ESCO projects in our database generated ~;;$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20percent of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ~;;$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures?including onsite generation and measures to address deferred maintenance?but this evolution has significant implications for customer project economics, especially at K-12 schools. We found that the median simple payback time has increased from 1.9 to 3.2 years in private sector projects since the early-to-mid 1990s and from 5.2 to 10.5 years in public sector projects for the same time period.

  14. Waste Tank Size Determination for the Hanford River Protection Project Cold Test, Training, and Mockup Facility

    SciTech Connect (OSTI)

    Onishi, Yasuo; Wells, Beric E.; Kuhn, William L.

    2001-03-30

    The objective of the study was to determine the minimum tank size for the Cold Test Facility process testing of Hanford tank waste. This facility would support retrieval of waste in 75-ft-diameter DSTs with mixer pumps and SSTs with fluidic mixers. The cold test model will use full-scale mixer pumps, transfer pumps, and equipment with simulated waste. The study evaluated the acceptability of data for a range of tank diameters and depths and included identifying how the test data would be extrapolated to predict results for a full-size tank.

  15. Characteristics and sources of intermediate size particles in recovery boilers : final project report.

    SciTech Connect (OSTI)

    Baxter, Larry L.; Shaddix, Christopher R.; Verrill, Christopher L.; Wessel, Richard A.

    2005-02-01

    As part of the U.S. Department of Energy (DOE) Office of Industrial Technologies (OIT) Industries of the Future (IOF) Forest Products research program, a collaborative investigation was conducted on the sources, characteristics, and deposition of particles intermediate in size between submicron fume and carryover in recovery boilers. Laboratory experiments on suspended-drop combustion of black liquor and on black liquor char bed combustion demonstrated that both processes generate intermediate size particles (ISP), amounting to 0.5-2% of the black liquor dry solids mass (BLS). Measurements in two U.S. recovery boilers show variable loadings of ISP in the upper furnace, typically between 0.6-3 g/Nm{sup 3}, or 0.3-1.5% of BLS. The measurements show that the ISP mass size distribution increases with size from 5-100 {micro}m, implying that a substantial amount of ISP inertially deposits on steam tubes. ISP particles are depleted in potassium, chlorine, and sulfur relative to the fuel composition. Comprehensive boiler modeling demonstrates that ISP concentrations are substantially overpredicted when using a previously developed algorithm for ISP generation. Equilibrium calculations suggest that alkali carbonate decomposition occurs at intermediate heights in the furnace and may lead to partial destruction of ISP particles formed lower in the furnace. ISP deposition is predicted to occur in the superheater sections, at temperatures greater than 750 C, when the particles are at least partially molten.

  16. Microsoft Word - DOE-ID-INL-12-024..doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PostingNo.: DOE-ID-INL-12-024 SECTION A. Project Title: Rigby Bus Lot Northwest Entrance SECTION B. Project Description: The purpose of the proposed action is to provide an additional bus entrance to the Rigby Park and Ride Bus Lot. A portion of chain link fencing (running east to west) on the northwest corner of the Rigby Park and Ride Bus Lot would be relocated to allow an opening off of the City of Rigby dirt access road so that buses may enter the Rigby Park and Ride Lot from the northwest.

  17. Microsoft Word - DOE-ID-INL-14-015.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 CX Posting No.: DOE-ID-INL-14-015 SECTION A. Project Title: United States Geological Survey (USGS) Geotechnical Drilling for USGS-142 and USGS-143 SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to continuously core geotechnical boreholes USGS-142 and USGS-143 to a depth of 1,000 and 2,000 ft below land surface, respectively. Boreholes USGS-142 and USGS-143 would be constructed as monitoring wells and used to measure and collect aquifer data. Borehole USGS-142 (see

  18. Microsoft Word - DOE-ID-INL-15-009.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CS Posting No.: DOE-ID-INL-15-009 SECTION A. Project Title: Bond Strength Laser Shock Testing SECTION B. Project Description: The proposed action is to install a laser shock system in the hot cell at the Hot Fuels Examination Facility (HFEF) at Idaho National Laboratory's (INL's) Materials and Fuels Complex (MFC). The system is needed to study bond strength of cladding on nuclear fuel associated with the Reduced Enrichment Research and Test Reactor (RERTR). The Laser Shock System delivers a high

  19. THE SIZE DIFFERENCE BETWEEN RED AND BLUE GLOBULAR CLUSTERS IS NOT DUE TO PROJECTION EFFECTS

    SciTech Connect (OSTI)

    Webb, Jeremy J.; Harris, William E.; Sills, Alison

    2012-11-10

    Metal-rich (red) globular clusters in massive galaxies are, on average, smaller than metal-poor (blue) globular clusters. One of the possible explanations for this phenomenon is that the two populations of clusters have different spatial distributions. We test this idea by comparing clusters observed in unusually deep, high signal-to-noise images of M87 with a simulated globular cluster population in which the red and blue clusters have different spatial distributions, matching the observations. We compare the overall distribution of cluster effective radii as well as the relationship between effective radius and galactocentric distance for both the observed and simulated red and blue sub-populations. We find that the different spatial distributions does not produce a significant size difference between the red and blue sub-populations as a whole or at a given galactocentric distance. These results suggest that the size difference between red and blue globular clusters is likely due to differences during formation or later evolution.

  20. IDS Climate Change and Development Centre Resources | Open Energy...

    Open Energy Info (EERE)

    IDS Climate Change and Development Centre Resources Jump to: navigation, search Tool Summary Name: IDS Climate Change and Development Centre Resources AgencyCompany Organization:...

  1. 1-ID Home Page | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-ID Home Infrastructure Techniques Data Analysis Publications X-ray Resources Materials Physics and Engineering Group Useful Links Current APS status ESAF System GUP System X-Ray...

  2. Id-1 and Id-2 genes and products as markers of epithelial cancer

    DOE Patents [OSTI]

    Desprez, Pierre-Yves; Campisi, Judith

    2011-10-04

    A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

  3. Id-1 and Id-2 genes and products as markers of epithelial cancer

    DOE Patents [OSTI]

    Desprez, Pierre-Yves; Campisi, Judith

    2008-09-30

    A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

  4. CAES Wind Project | Open Energy Information

    Open Energy Info (EERE)

    Wind Project Jump to: navigation, search Name CAES Wind Project Facility CAES Sector Wind energy Facility Type Community Wind Location ID Coordinates 43.522243, -112.053963...

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 1, 2014 - November 30, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  6. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 1, 2014 - December 31, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  7. Requesting a Digital ID | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Digital ID Requesting a Digital ID S puzzle1.jpg tep One - Registering with the DOE's Management Information System (MIS) Before you request a DOE Digital Identity, you must register in DOE's Management Information System (MIS). Please note that DOE Federal employees are already registered and do not need to complete this step. The may skip to step two. During the registration process, you will be required to select a DOE sponsor. Your sponsor is the DOE employee who certifies that you have a

  8. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    Office of Environmental Management (EM)

    Page 1 of 1 CX Posting No.: DOE-ID-13-044 SECTION A. Project Title: Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal of Contaminants - University of Idaho SECTION B. Project Description The University of Idaho proposes to evaluate nanostructured sorbent materials for their effectiveness in removing and immobilizing contaminants for the off-gas treatment from the used nuclear fuel recycling operations. Specific objectives of the project are: 1. To synthesize and

  9. I.D I VI Figure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ~press - ,~,.--;~ 3.1 ,,~-.::;:.--- ~ ( 3.1 ( ;-; t\ I.D I VI Figure 9-1. Location of the original Cypress Grove Set-Aside and the Stave Island and Georgia Power replacement Areas. Set-Aside 9: Cypress Grove, Stave Island, and Georgia Power

  10. Vehicle Technologies Office Merit Review 2014: Catalyst Characterization (Agreement ID:9130) Project ID:18519

    Broader source: Energy.gov [DOE]

    Presentation given by Cummins at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about catalyst characterization.

  11. Vehicle Technologies Office Merit Review 2014: High Temperature Aluminum Alloys (Agreement ID:24034) Project ID:18518

    Broader source: Energy.gov [DOE]

    Presentation given by Pacific Northwest National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about high...

  12. Facility Representative Program Outstanding at ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2007 Facility Representative Program Outstanding at ID Idaho's three DOE Complex-wide Facility Representative of the Year (FROTY) recipients at this year's conference pose for a photo shoot with Elvis. L to R: Dary Newbry 2005 FROTY, Bob Seal 2006 FROTY, Bob Knighten 2004 FROTY Facility representatives (FRs) are the eyes and ears of the federal government at the Idaho National Laboratory. They oversee the people, processes, facilities and systems that ensure safety at INL facilities.

  13. MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho

    Office of Environmental Management (EM)

    MAJOR CONFORMED CONTRACTS LINKS SiteProject Contract Link Idaho Idaho Cleanup Project http:www.id.doe.govdoeidICPContractICPContract.htm Advance Mixed Waste Treatment http:...

  14. Facility Representative Program ID Selects FR of the Year

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Representative Program ID Selects FR of the Year John Martin DOE-ID Facility Representative John Martin DOE-ID Facility Representative of the Year. John Martin was selected as DOE-ID's Facility Representative of the Year and the office's nominee for the 2007 DOE Facility Representative of the Year Award. John was selected from an exceptional field of candidates to represent DOE-ID at the Facility Representative Annual Workshop in Las Vegas this May. Each year the Department of Energy

  15. CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS: The REAL ID Act (Public Law 109-13) now determines which state driver's license can be presented and accepted as a valid ID document for access to Jefferson Lab. The following states/US territories have been determined by the U.S. Department of Homeland Security to have failed to comply with the REAL ID Act: American Samoa, Illinois, Minnesota, Missouri, and Washington. As of March 2, 2015, Jefferson Lab will begin using the REAL ID Act

  16. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  17. ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PROJECT Idaho Treatment Group, LLC (ITG) Contract No. DE-EM0001467 You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > AMWTP Contract > Basic Contract...

  18. Property:HPBD/ProjectId | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 82 + High Performance Buildings Database + 1,016 + High Performance...

  19. Mo Year Report Period: EIA ID NUMBER:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S.

  20. SLAC Dosimeter / ID Request Form A

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 SLAC Dosimeter / ID Request Form A (For applicants who have completed SLAC Environment, Safety, and Health Training) Sections 1-5 completed by applicant. Section 1: Contact Information Last name: First name: MI: Male Female Birth year (yyyy): Job title: Contact information/mailing address: City: State: Zip code: Country: Dept/Group: Phone number: Mail stop: Users or non-SLAC employees only: List employer, company, or university :

  1. Airless drying -- Developments since IDS'94

    SciTech Connect (OSTI)

    Stubbing, T.J.

    1999-09-01

    Since its introduction to IDS'94 delegates, significant progress has been made with the development of airless drying technology. The ceramic industry internationally is beginning to benefit from both the energy use and drying time reductions it achieves, while on the basis of further theoretical work carried out since 1993 other industries, including the bioenergy sector, should also soon begin to exploit its advantages. As global warming becomes a reality and oil reserves decline, superheated steam drying and gasification of biomass will contribute to the mitigation of those problems.

  2. Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    SciTech Connect (OSTI)

    Larsen, Peter; Goldman, Charles A.; Satchwell, Andrew

    2012-05-08

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of -3,265 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of an economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues are relatively small compared to total U.S. energy expenditures (about $4.1 billion in 2008), but ESCOs anticipated accelerated growth through 2011 (25% per year). We found that 2,484 ESCO projects in our database generated -$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated -$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. We found that nearly 85% of all public and institutional projects met or exceeded the guaranteed level of savings. We estimated that a typical ESCO project generated $1.5 dollars of direct benefits for every dollar of customer investment. There is empirical evidence confirming that the industry is responding to customer demand by installing more comprehensive and complex measures—including onsite generation and measures to address deferred maintenance—but this evolution has significant implications for customer project economics, especially at K-12 schools. We found that the median simple payback time has increased from 1.9 to 3.2 years in private sector projects since the early-to-mid 1990s and from 5.2 to 10.5 years in public sector projects for the same time period.

  3. Property:WFSPTurbineID | Open Energy Information

    Open Energy Info (EERE)

    + Auburn-Washburn Wind Project + 120,012 + Avery County High School Wind Project + 110,607 + B Bancroft-Rosalie Public Schools Wind Project + 108,812 + Bloomfield Public Schools...

  4. Carry Emergency Contact Card with your Lab ID | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carry Emergency Contact Card with your Lab ID Jefferson Lab Emergency Manager, Tina Menefee, encourages all members of the Jefferson Lab community to carry their JLab emergency notification and reminder card with their lab ID. Put it on your ID lanyard or carry it in your wallet. The card (front and back pictured below) lists the primary numbers where emergencies, injuries, or any abnormal situation should be reported. The other side of the card provides guidance on reporting emergencies and

  5. RAPID/Roadmap/12-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Contact Us State Biological Resource Considerations (12-ID-a) The Idaho Department of Fish & Game preserves wildlife against any direct take, including wild animals, birds, and...

  6. RAPID/Roadmap/8-ID-e | Open Energy Information

    Open Energy Info (EERE)

    ID-e < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools...

  7. RAPID/Roadmap/3-ID-e | Open Energy Information

    Open Energy Info (EERE)

    ID-e < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools...

  8. RAPID/Roadmap/14-ID-b | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap14-ID-b < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  9. RAPID/Roadmap/8-ID-a | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap8-ID-a < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  10. RAPID/Roadmap/6-ID-b | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap6-ID-b < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  11. RAPID/Roadmap/17-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Contact Us Aesthetic Resource Assessment (17-ID-a) 17IDAAestheticResourceAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  12. RAPID/Roadmap/9-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Environmental Review Process (9-ID-a) Add overview. 09IDAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  13. RAPID/Roadmap/14-ID-c | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us Underground Injection Control Permit (14-ID-c) Rule 40 of the Idaho Department of Water Resources' Drilling for...

  14. RAPID/Roadmap/14-ID-d | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us 401 Water Quality Certification (14-ID-d) IDEQ is...

  15. RAPID/Roadmap/14-ID-f | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us 401 NPDES Water Quality Certification (14-ID-f) Idaho...

  16. RAPID/Roadmap/4-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Exploration Process (4-ID-a) 04IDAStateExploration...

  17. RAPID/Roadmap/11-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Cultural Considerations (11-ID-a) Idaho has a statute that provides state...

  18. RAPID/Roadmap/15-ID-b | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Tier II Operating Permit (15-ID-b) Tier II Operating Permits are...

  19. RAPID/Roadmap/15-ID-a | Open Energy Information

    Open Energy Info (EERE)

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Permit to Construct (15-ID-a) The Idaho Department of Environmental...

  20. RAPID/Roadmap/5-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Hydropower Solar Tools Contribute Contact Us Drilling and Well Development (5-ID-a) 05IDADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in...

  1. DOE-ID FOIA Electronic Reading Room Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electronic Reading Room Documents Electronic Reading Room Documents The information contained here represents DOE-ID's responses to FOIA requests that have been or are likely to be...

  2. Temporary EPA ID Number Request | Open Energy Information

    Open Energy Info (EERE)

    Temporary EPA ID Number RequestLegal Abstract A developer that may "generate hazardous waste only from an episodic event" may instead apply for a temporary hazardous waste...

  3. DOE - Office of Legacy Management -- Lowman Mill Site - ID 01

    Office of Legacy Management (LM)

    Lowman Mill Site - ID 01 FUSRAP Considered Sites Site: Lowman Mill Site (ID.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Lowman, Idaho, Disposal Site Documents Related to Lowman Mill Site

  4. Id-1 and Id-2 genes and products as therapeutic targets for treatment of breast cancer and other types of carcinoma

    DOE Patents [OSTI]

    Desprez, Pierre-Yves; Campisi, Judith

    2014-09-30

    A method for treatment and amelioration of breast, cervical, ovarian, endometrial, squamous cells, prostate cancer and melanoma in a patient comprising targeting Id-1 or Id-2 gene expression with a delivery vehicle comprising a product which modulates Id-1 or Id-2 expression.

  5. JLab Registration/International Services - Researcher/Visitor ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Researcher/Visitor ID Requirements CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS U.S. Citizens must bring a valid Government issued ID card that contains a photo such as a passport or valid driver's license. Non-driver photo identification cards issued by the Department of Motor Vehicles can be used as proof of identification. Lawful Permanent Resident of the United States must bring their Green Card or passport with valid I-551 stamp AND a valid government issued

  6. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS ... for CO 2 -EOR and CO 2 transportation for CCS assuming a carbon price are discussed. ...

  7. Final Report: DOE/ID/14215

    SciTech Connect (OSTI)

    Kenneth Bryden; J. Richard Hess; Thomas Ulrich; Robert Zemetra

    2008-08-18

    The proposed straw separation system developed in the research project harvests the large internode sections of the straw which has the greater potential as a feedstock for lignocellulosic ethanol production while leaving the chaff and nodes in the field. This strategy ensures sustainable agriculture by preventing the depletion of soil minerals, and it restores organic matter to the soil in amounts and particle sizes that accommodate farmers needs to keep tillage and fertilizer costs low. A ton of these nutrient-rich plant tissues contains as much as $10.55 worth of fertilizer (economic and energy benefits), in terms of nitrogen, phosphorus, potassium, and other nutrients provided to the soil when incorporated by tillage instead of being burned. Biomass conversion to fermentable sugars for the purpose of producing fuels, chemicals, and other industrial products is well understood. Most bioenergy strategies rely on low-cost fermentable sugars for sustainability and economic viability in the marketplace. Exploitation of the whole cropspecifically, wheat straw or other plant material currently regarded as residue or wasteis a practical approach for obtaining a reliable and low-cost source of sugars. However, industrial-scale production of sugars from wheat straw, while technically feasible, is plagued by obstacles related to capital costs, energy consumption, waste streams, production logistics, and the quality of the biomass feedstock. Currently available separation options with combine harvesters are not able to achieve sufficient separation of the straw/stover and chaff streams to realize the full potential of selective harvest. Since ethanol yield is a function of feedstock structural carbohydrate content, biomass anatomical fractions of higher product yield can have a significant beneficial impact on minimum ethanol selling price. To address this advanced biomass separation computation engineering models were developed to more effectively and efficiently engineer high-fidelity and high throughput separation systems for biomass components. INL and Iowa State University developed a computational modeling strategy for simulating multi-phase flow with an integrated solver using various computational fluid dynamics (CFD) codes. ISU set up a classic multi-phase test problem to be solved by the various CFD codes. The benchmark case was based on experimental data for bubble gas holdup and bed expansion for a gas/solid fluidized bed. Preliminary fluidization experiments identified some unexpected fluidization behavior, where rather than the bed uniformly fluidizing, a blow out would occur where a hole would open up in the bed through which the air would preferentially flow, resulting in erratic fluidization. To improve understanding of this phenomena and aid in building a design tool, improved computational tools were developed. The virtual engineering techniques developed were tested and utilized to design a separation baffle in a CNH combine. A computational engineering approach involving modeling, analysis, and simulation was used in the form of virtual engineering to design a baffle separator capable of accomplishing the high-fidelity residue separation established by the performance targets. Through the use of the virtual engineering model, baffle designs were simulated to (1) determine the effect of the baffle on the airflow of the combine cleaning system, and (2) predict the effectiveness of the baffle in separating the residue streams. A baffle design was selected based on the virtual engineering modeling, built into the INL selective harvest test combine. The result of the baffle changes improved the crop separation capability of the combine, enabling downstream improvement in composition and theoretical ethanol yield. In addition, the positive results from the application of the virtual engineering tools to the CNH combine design resulted in further application of these tools to other INL areas of research. INL and the University of Idaho identified, characterized, and modified a key plant biosynt

  8. Poster - DOE Data ID Service | OSTI, US Dept of Energy, Office...

    Office of Scientific and Technical Information (OSTI)

    ID Service Document Files and References Available Downloads for this Document: applicationpdf icon Poster DOE Data ID Service Last updated on Tuesday 22 December...

  9. RAPID/Roadmap/18-ID-b | Open Energy Information

    Open Energy Info (EERE)

    demonstrate insurance coverage that would protect the community from incurring clean-up costs in the event of the developer's insolvency. 18-ID-b.5 - Facility siting license...

  10. RAPID/Roadmap/6-ID-c | Open Energy Information

    Open Energy Info (EERE)

    Tools Contribute Contact Us Drinking Water Permit (6-ID-c) 06IDCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  11. RAPID/Roadmap/7-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Contact Us Power Plant Siting Process (7-ID-a) 07IDAPowerPlantSitingConstruction.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  12. RAPID/Roadmap/13-ID-a | Open Energy Information

    Open Energy Info (EERE)

    Contribute Contact Us State Land Use Assessment (13-ID-a) 13IDALandUseAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  13. RAPID/Roadmap/6-ID-a | Open Energy Information

    Open Energy Info (EERE)

    load A load is overlegal if the load is: width over 8'6"; Over 14' tall; Truck and trailer combined are over 75' long; or The load weighs over 80,000 pounds. 6-ID-a.2 - Meet...

  14. RAPID/Roadmap/19-ID-a | Open Energy Information

    Open Energy Info (EERE)

    to 19-ID-a.5 - Is a Change in Point of Diversion, Place of Use, Period of Use, or Nature of Use Needed for an Existing Water Right If the proposed activity will require a...

  15. RAPID/Roadmap/3-ID-a | Open Energy Information

    Open Energy Info (EERE)

    the IDL becomes involved only if they are notified and the Land Board requests their involvement. 3-ID-a.3 - Consultation (optional) IDL may meet with any other state agency to...

  16. Beamline 4-ID-C | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C 4-ID-C Home Recent Publications XSD-MM Home MM Advisory Committees FAQs Beamline Info Instrumentation Magnet Materials Internal Useful Links Current APS status ESAF System GUP...

  17. Employee Assistance Self-ID Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form-HQ PDF icon Employee Assistance Self-ID Form More Documents & Publications DOE HQ Special Needs Assistance in an Emergency DOE Emergency Special Needs Self-Identification...

  18. RAPID/Roadmap/3-ID-d | Open Energy Information

    Open Energy Info (EERE)

    Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Land Use Permit (3-ID-d) The Idaho Department of Lands issues Land Use Permits for...

  19. T-642: RSA SecurID update to Customers

    Broader source: Energy.gov [DOE]

    RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products

  20. Microsoft Word - DOE-ID-INL-15-070.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID-INL-15-070 excluded petroleum and natural gas products that pre-exist in the environment such that there would be uncontrolled or unpermitted releases; (4) have the...

  1. Vermont Hazardous Waste Handler Site ID Form | Open Energy Information

    Open Energy Info (EERE)

    to library Legal Document- Permit ApplicationPermit Application: Vermont Hazardous Waste Handler Site ID FormLegal Abstract This form is used to notify the Vermont Agency of...

  2. NERSC Helps Physicists ID New Molecules With Unique Features

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Helps Physicists ID New Molecules With Unique Features NERSC Helps Physicists ID New Molecules With Unique Features Hollow magnetic cage molecules may have applications in technology, healthcare August 10, 2013 NERSC supercomputing resources helped Virginia Commonwealth University (VCU) researchers determine it may be possible to create large, hollow magnetic cage molecules that could be used in medicine as a drug delivery system to noninvasively treat tumors and in other emerging

  3. Physicists ID Mechanism that Stabilizes Plasma in Tokamaks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Calculations Run at NERSC Create 3D Simulations of Fusion Plasmas January 4, 2016 Contact: Kathy Kincade, kkincade@lbl.gov, +1 510 495 2124 jardinfusion A cross-section of the virtual plasma showing where the magnetic field lines intersect the plane. The central section has field lines that rotate exactly once. Image: Stephen Jardin A team of physicists led by Stephen Jardin of

  4. Microsoft Word - DOE-ID-INL-16-002.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Test Reactor Area (TRA)-670 Control Room Break Room and 2 nd Basement Bathroom Modification SECTION B. Project Description and Purpose: The sewer system associated with the TRA-670 2nd basement restroom does not work properly. The piping leaks, does not drain properly, and sewer gas odor is present. To fix this, the sewer system has been re-designed to have the proper number of vents, piping size, and functioning components. The scope of this modification would

  5. Origin State>> CA CA ID ID ID IL KY MD MO NM NM NY NY OH SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MO NM NM NY NY OH SC TN TN TN, WA, CA TN TN TN TN Total Shipments by Route Lawrence Livermore National Laboratory General Atomics Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Paducah Gaseous Diffusion Plant Aberdeen Proving Grounds National Security Technologies Sandia National Laboratory Los Alamos National Laboratory Brookhaven National Laboratory CH2M Hill B&W West Valley, LLC Portsmouth Gaseous Diffusion Plant

  6. Origin State>> CA CA ID ID ID IL KY MD NM NM NV NY NY OH TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NM NM NV NY NY OH TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory General Atomics Advanced Mixed Waste Treatment Project Batelle Energy Alliance Idaho National Laboratory Argonne National Laboratory Paducah Gaseous Diffusion Plant Aberdeen Proving Ground Los Alamos National Laboratory Sandia National Laboratory National Security Technologies Brookhaven National Laboratory West Valley Environmental Services Portsmouth Gaseous Diffusion Plant

  7. Origin State>> CA ID ID ID IL KY MD NM NM NY NY OH SC TN TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MD NM NM NY NY OH SC TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Advanced Mixed Waste Treatment Project Batelle Energy Alliance Idaho National Laboratory Argonne National Laboratory Paducah Gaseous Diffusion Plant Aberdeen Proving Ground Los Alamos National Laboratory Sandia National Laboratory Brookhaven National Laboratory West Valley Environmental Services Portsmouth Gaseous Diffusion Plant Savannah River Site Duratek/Energy Solutions Babcox

  8. Origin State>> CA ID ID ID IL KY NV NY NY OH TN TN TN, WA, CA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NV NY NY OH TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Advanced Mixed Waste Treatment Project Batelle Energy Alliance Idaho National Laboratory Argonne National Laboratory Paducah Gaseous Diffusion Plant National Security Technologies Brookhaven National Laboratory West Valley Environmental Services Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation

  9. Origin State>> CA ID ID ID IL MD NM NM NV NY NY OH SC TN TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NV NY NY OH SC TN TN TN, WA, CA TN TN TN Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Aberdeen Proving Ground Sandia National Laboratory Los Alamos National Laboratory National Security Technologies Brookhaven National Laboratory West Valley Environmental Services Portsmouth Gaseous Diffusion Plant Savannah River Site Duratek/Energy Solutions Babcox & Wilcox

  10. Origin State>> CA ID ID ID IL MD NM NM NY OH TN TN TN, WA, CA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NY OH TN TN TN, WA, CA TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Aberdeen Proving Ground Sandia National Laboratory Los Alamos National Laboratory Brookhaven National Laboratory Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation (M&EC) Perma-Fix

  11. Origin State>> CA ID ID ID IL NM NM OH TN TN TN, WA, CA TN TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NM NM OH TN TN TN, WA, CA TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Batelle Energy Alliance Idaho National Laboratory Advanced Mixed Waste Treatment Project Argonne National Laboratory Sandia National Laboratory Los Alamos National Laboratory Portsmouth Gaseous Diffusion Plant Duratek/Energy Solutions Babcox & Wilcox Technical Services Y-12 Plant Materials & Energy Corporation (M&EC) Perma-Fix Nuclear Fuels Services Wastren Advantage, Inc.

  12. http://www.osti.gov/bridge/product.biblio.jsp?osti_id=807571

    National Nuclear Security Administration (NNSA)

    impacts of the Project on the environment. Country of Publication United States Language English Format Medium: ED; Size: vp. System Entry Date 2008 Feb 05 Document...

  13. AMEN DMENT OF SOLICITATION/MODIFICATION OF CONTRACT r* CONTRACT ID CODE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AMEN DMENT OF SOLICITATION/MODIFICATION OF CONTRACT r* CONTRACT ID CODE I PAGE OF PAGES 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. ,5. PROJECT NO. (If applicable) 0234 10/08/2013 6.1SSUED BY CODE 00603 7. ADMINISTERED BY (If other than Item 6) CODE I00603 Office of River Protection u.s. Department of Energy Office of River Protection P.O. Box 450 Richland WA 99352 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state and ZIP Code) ASHINGTON

  14. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1.CONTRACT ID CODE PAGE OF PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CONTRACT ID CODE PAGE OF PAGES T 1 1 13 2 AMENDIMENT/MODIFICATION NO 3. EFFECTIVE DATE 4 -REGUISITION/PURCHASE RED. NO 5. PROJECT NO. (If epplicable) 032 04/14/2011 11EM002244 6 ISSUED BY CODE 00603 7 ADMINISTERED BY (Iftherthan temrt6) CODE J00603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 Richland WA 99352 8 NAME AND ADDRESS OF

  15. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT \1. CONTRACT ID CODE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ID CODE I PAGE OF PAGES 1 I 2 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REOUISITIONIPURCHASE REO. NO. r' PROJECT NO. (If applicable) 356 See Block 16C 12SC001876 Item 7 6. ISSUED BY CODE 00518 7. ADMINISTERED BY (If other than Item 6) CODE \00518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 P.O. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., stroot, county, State and ZIP Code) J1 SA. AMENDMENT OF

  16. AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT 1. CONTRACT ID CODE P AE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OF CONTRACT 1. CONTRACT ID CODE P AE 2. AMEN DMENT/MODIF ICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE RED. NO. 5. PROJECT NO. (If applicable) 073 See Block 16C 12EM002951/12EM003004 6. ISSUED BY CODE 100603 7. ADMINISTERED BY (If other than Item 6) CODE 100603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection Office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 Richland WA 99352 8. NAME

  17. AMENDMENT OF SOUCITATIONIMODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1. CONTRACT ID CODE PAGE OF PAGES II 11 9 2. AMEN DMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REOUISITIONIPURCHASE REQ. NO. 5. PROJECT NO. (If elpicable) 169 See Block 16C 12EM0020631 6. ISSUED BY CODE 00603 7. ADMINISTERED BY (If otherthan Item 6) CODE 100603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection Office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 MS: H6-60

  18. 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

    National Nuclear Security Administration (NNSA)

    11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C 05008 4. REQUISITION/PURCHASE REQ. NO. 7. ADMINISTERED BY (If other than Item 6) 15. PROJECT NO. (If applicable) CODE 1 0 5 0 0 8 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S. Department of Energy U. S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 Building 9704-2

  19. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    -------------------------------------------------------- AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE I PAGE OF PAGES 1 I 2 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicable) 0246 See Block 16C 6. ISSUED BY CODE 05003 7. ADMINISTERED BY (If other than Item 6) CODE 105003 NNSA/Los Alamos Site Office NNSA/Los Alamos Site Office U.S. Department of Energy U.S. Department of Energy NNSA/Los Alamos Site Office Los

  20. Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray

    Office of Legacy Management (LM)

    Dames & Moore Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray MANAGED BY LOCKHEED MARTIN rNERGY RESEARCH CORPORATION PHONE: (423) 574-5838 FOR THE U.S. DEPARTMENT OF ENERGY FAX: (423) POST OFFICE Box 2 INTERNET: r'0 March 31, 1997 Mr. Andrew Meloy DuPont Environmental Remediation Services DuPont Chambers Works Route 130, Anti-Knocks Building G Deepwater, New Jersey 08023 Dear Mr. Meloy: Radiological Sampling Requirements for the B Ditch Remediation Project, DuPont Chamber

  1. Projects & Facilities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities About Us Projects & Facilities Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Projects & Facilities 100 Area 118-K-1 Burial Ground 200...

  2. DOE Data ID Service | OSTI, US Dept of Energy, Office of Scientific and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Information DOE Data ID Service DataCite | Contact DOE Data ID Service DOE Data ID Service DOE Data ID Service The DOE Office of Scientific and Technical Information (OSTI) offers a service for registering datasets to help increase access to digital data from DOE-funded scientific research. Through the DOE Data ID Service, OSTI assigns persistent identifiers, known as Digital Object Identifiers (DOIs), to datasets submitted by DOE and its contractor and grantee researchers and

  3. Vehicle Technologies Office Merit Review 2014: Materials Issues Associated with EGR Systems (Agreement ID:18571) Project ID:18518

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials...

  4. Vehicle Technologies Office Merit Review 2014: Biofuel Impacts on Aftertreatment Devices (Agreement ID:26463) Project ID:18519

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about biofuel impacts...

  5. Vehicle Technologies Office Merit Review 2014: Friction Reduction through Surface Modification (Agreement ID:23284) Project ID:18518

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about friction...

  6. Vehicle Technologies Office Merit Review 2014: Durability of Diesel Particulate Filters (Agreement ID:10461) Project ID:18519

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about durability of...

  7. Vehicle Technologies Office Merit Review 2014: Applied ICME for New Propulsion Materials (Agreement ID:26391) Project ID:18865

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about applied ICME...

  8. Vehicle Technologies Office Merit Review 2014: Enabling Materials for High Temperature Power Electronics (Agreement ID:26461) Project ID:18516

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about enabling...

  9. Vehicle Technologies Office Merit Review 2014: Materials for Advanced Turbocharger Designs (Agreement ID:17257) Project ID:18518

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials for...

  10. Specific Manufacturing Capability Project presented with special...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specific Manufacturing Capability Project presented with special thank-you note From left, DOE-ID's Ray Furstenau, INL's Riley Chase, SMC's Joel Duling, Army's Ltc. Evans and Mike...

  11. Geothermal Resource Exploration and Definition Projects | Open...

    Open Energy Info (EERE)

    Hills (U-Boat), NV, and Lightning Dock, NM. The seven GRED II projects are located at Raft River, ID, Blue Mountain, NV, Truckhaven, CA, Animas Valley, NM, Lake City, CA, Glass...

  12. DOI-BLM-ID-T020-2012-0003-CX | Open Energy Information

    Open Energy Info (EERE)

    ID-T020-2012-0003-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-T020-2012-0003-CX CX for GeothermalExploration CX for Seismic Survey at ?? Geothermal...

  13. Finding Utility Companies Under a Given Utility ID | OpenEI Community

    Open Energy Info (EERE)

    utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: Category:Utility CompaniesEiaUtilityId::15248 substituting...

  14. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID |

    Office of Environmental Management (EM)

    Department of Energy 1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page duplicate

  15. Desert Peak EGS Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Desert Peak EGS Project DOE Award: DE-FC6-02ID14406 Ethan Chabora GeothermEx, a Schlumberger Company Ezra Zemach Ormat Nevada Inc. Project Officer: Bill Vandermeer Total Project Funding: $7.6M April 22nd, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. Insert photo of your choice 2 | US DOE Geothermal Program eere.energy.gov - Timeline * Project start date: September 2002 * Project end date: Q3 2013 * Percentage complete: 90% - Budget *

  16. Microsoft Word - 140602DOE-ID_OperationsSummary.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2014 DOE-ID Operations Summary For the Period April 8, 2014 through May 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  17. Microsoft Word - DOE-ID-INL-12-017.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Engineering Research Office Building (EROB) 1E- Human System Simulation Laboratory Modifications SECTION B. Project Description: The Nuclear Science and Technology (NS&T) customer for Human Simulation Systems Lab (HSSL) has requested additional - computer lab space to support forth coming projects in yearend FY12 and projected into FY13. Project specific is the LWRS-related project for control room upgrades for a commercial client. The project will utilize the

  18. DOE-ID Procurement Services � the action team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s

  19. AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must

  20. Material Safety Data Sheet MSDS ID NO.: 0137SPE012

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Material Safety Data Sheet MSDS ID NO.: 0137SPE012 Revision date: 05/25/2011 1. CHEMICAL PRODUCT AND COMPANY INFORMATION Product name: Speedway E85 Synonym: Speedway ED75/ED85; E-75; E75; E-85; E85; Ethanol/Gasoline Fuel Blend; Fuel Ethanol ED75/ED85 Chemical Family: Gasoline/Ethanol Formula: Mixture Manufacturer: Speedway LLC P.O. Box 1500 Enon, OH 45501 Other information: 419-421-3070 Emergency telephone number: 877-627-5463 2. COMPOSITION/INFORMATION ON INGREDIENTS E85 is a mixture of ethyl

  1. 1. CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE (M/D.'F) 4. REQUISITION/PURCHASE RE-Q. NO. S. PROJECT1 NO. t7fapplieoble) 27See Block 16C 12EM001839 6. ISUED13Y ODE7. ADMINISTER.ED BY (If uI/wr ius /tem 6) CODE U.S. Department of Energy Office or River Protection P. 0. Box 450, MS 146-60 Richland, WA 99352 1. NAME AND ADDRESS OF CONTRACTOR (No.,stree, county State and Z11' code) 9A, AMENDMEN f

  2. 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I11 5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ap5,sval 2700042 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I11 5 2. AMENDMENT/MOOIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.5 PROJECT NO. (If applicable) A077 See 16C 06-08RL-14383.O1 1 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODEJ US. Department of Energy Same as item 6. Richland Operations Office DOE Contracting POC: Richard Stimmrrel P. 0. Box 550, MSIN A7-80 (509) 376-2882 Richland, WA 99352 8 NAME AND

  3. AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I ' CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    ' CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE 1 OF 12 PAGES 9B. DATED (SEE ITEM 11) 5. PROJECT NO. (If applicable) 4. REQUlSlTlONlPURCHASE REQ. NO. 2. AMENDMENTIMODIFICATION NO. MI39 extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must

  4. Microsoft Word - DOE-ID-INL-15-008.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Ceramic Sensor Experiments in the Analytical Laboratory SECTION B. Project Description: The purpose of the proposed action is to research the...

  5. Class 8 Truck Freight Efficiency Improvement Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Daimler Trucks and Buses 1 Super Truck Program: Vehicle Project Review Recovery Act -Class 8 Truck Freight Efficiency Improvement Project Project ID: ARRAVT080 This presentation does not contain any proprietary, confidential, or otherwise restricted information Derek Rotz (PI & Presenter) Dr. Maik Ziegler Daimler Truck North America LLC June 19 th , 2014 Daimler Trucks and Buses 2 Overview * Project start: April 2010 * Project end: March 2015 * Percent complete: 80% * Resolve thermal &

  6. Class 8 Truck Freight Efficiency Improvement Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Super Truck Program: Vehicle Project Review Recovery Act -Class 8 Truck Freight Efficiency Improvement Project Project ID: ARRAVT080 This presentation does not contain any proprietary, confidential, or otherwise restricted information Derek Rotz (PI & Presenter) Dr. Maik Ziegler Daimler Truck North America LLC June 11 th , 2015 1 Overview * Project start: April 2010 * Project end: March 2015 * Percent complete: 100% * Resolve thermal & fluid dynamics tradeoffs between aero & cooling

  7. Microsoft Word - DOE-ID-INL-11-004.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04 SECTION A. Project Title: ATR Canal AFIP-7 Channel Gap Probe Installation Project SECTION B. Project Description: The location for the proposed project is the Advanced Test Reactor (ATR) at the ATR Complex, located at the Idaho National Laboratory (INL). This project involves the following primary efforts: * Installation of the channel gap probe instrument into the East end of the ATR canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o

  8. Microsoft Word - DOE-ID-INL-15-024.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuels Complex (MFC) MH50 Fiber Optic Installation Project SECTION B. Project Description: MFC has a facility entry fiber bottleneck that limits the ability to recover networks and telecommunications in the event of a single fiber strand failure. The proposed project would provide available fibers in a failure situation and reduce risks to MFC Operations. The proposed project would install approximately 6,700 feet of fiber optic telecommunication cable

  9. Microsoft Word - DOE-ID-INL-15-035.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Power Burst Facility (PBF)-622 Moran Project Facility Modifications SECTION B. Project Description: The equipment and process for the Moran Project (formerly "PUREX") are documented in Environmental Checklist (EC) INL-14-029 and its revisions. The Moran Project is located at Idaho National Laboratory's (INL's) Critical Infrastructure Test Range Complex (CITRC), in building PBF-622. Modifications to PBF-622 are needed to support research and development

  10. IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section Knowledge on Oscillation Knowledge on Oscillation Measurements Measurements M. Sorel, IFIC (CSIC and U. of Valencia) IDS-NF, RAL, Jan 16-17 2008 M. Sorel - IFIC (Valencia U. & CSIC) 2 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA M. Sorel - IFIC (Valencia U. & CSIC) 3 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA Beta

  11. Implementation of the REAL ID Act | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    recommendations of the 911 Commission, passed the REAL ID Act in an effort to reduce fraud and deter acts of terrorism using fraudulent identification. This Act sets minimum...

  12. Summary - Preliminary TRA of the Calcine Disposition Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Id materi Dec. 2 Press additiv form w those project anticip 2012 a CD-1 a selecte ... ents (CTEs) of t n the TRLs that ration for CD-1 What th ssessment team along with the ved ...

  13. Underground Storage Tank Integrated Demonstration (UST-ID). Technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The DOE complex currently has 332 underground storage tanks (USTs) that have been used to process and store radioactive and chemical mixed waste generated from weapon materials production. Very little of the over 100 million gallons of high-level and low-level radioactive liquid waste has been treated and disposed of in final form. Two waste storage tank design types are prevalent across the DOE complex: single-shell wall and double-shell wall designs. They are made of stainless steel, concrete, and concrete with carbon steel liners, and their capacities vary from 5000 gallons (19 m{sup 3}) to 10{sup 6} gallons (3785 m{sup 3}). The tanks have an overburden layer of soil ranging from a few feet to tens of feet. Responding to the need for remediation of tank waste, driven by Federal Facility Compliance Agreements (FFCAs) at all participating sites, the Underground Storage Tank Integrated Demonstration (UST-ID) Program was created by the US DOE Office of Technology Development in February 1991. Its mission is to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat to concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to the public and the regulators. The UST-ID has focused on five DOE locations: the Hanford Site, which is the host site, in Richland, Washington; the Fernald Site in Fernald, Ohio; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site in Savannah River, South Carolina.

  14. Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Projects

  15. JFNK_Projection.dvi

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notes on Newton-Krylov based Incompressible Flow Projection Solver R.R. Nourgaliev a , M.Christon b , J.Bakosi c a Idaho National Laboratory, Nuclear Science and Technology Division, Thermal Science & Safety Analysis Department, 2525 North Fremont Ave. Idaho Falls, ID 83415-3860 Email: Robert.Nourgaliev@inl.gov b Los Alamos National Laboratory, Computer, Computational and Statistical Sciences Division, Computational Physics Group (CCS-2)) Los Alamos, NM 87545 Email: christon@lanl.gov c Los

  16. Microsoft Word - DOE-ID-INL-11-001.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Hex Block Shipment Project SECTION B. Project Description. This project involves the shipment of two irradiated stainless steel hex blocks presently located at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) to a Westinghouse facility located in Pittsburgh, Pennsylvania to support Research and Development (R&D) activities. This R&D work will be performed by a private contractor and will involve the use of ultrasonic equipment to determine

  17. Microsoft Word - DOE-ID-INL-13-004.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: High Density Fuel Material for Light Water Reactors (LWRs) SECTION B. Project Description This project proposes to install glove boxes, laboratory equipment and laboratory hoods in the east wing of the Experimental Fuels Facility (EFF), building 794, at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The building was previously known as the Contaminated Equipment Storage Building (CESB). The purpose of this project is to support a high

  18. Microsoft Word - DOE-ID-INL-13-013.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement SECTION B. Project Description: The purpose of this project is to automate the ATR Primary Coolant Leak Rate Determination System by replacing existing flow transmitters and installing new transmitters to provide a redundant signal. This project is part of an overall effort to implement Leak Before Break (LBB) at the ATR, and will improve accuracy and timeliness, provide

  19. Microsoft Word - DOE-ID-INL-14-054.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Land Mobile Radio Completion Project SECTION B. Project Description: This revision is to capture the additional installation of repeaters to increase the strength of Radio Frequency (RF) transmission equipment to increase signal strength that was not adequate after initial project completion. This revision also includes additional facilities that were not identified in the original environmental checklist (EC). The digital Land Mobile Radio Service that is currently

  20. Microsoft Word - DOE-ID-INL-15-015.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Idaho Falls (IF)-685 ERV-1 Work Platform SECTION B. Project Description: The proposed project will construct an elevated work platform around an air handler unit (ERV-1) in IF-685 (ESL). The platform is needed so that maintenance personnel will be able to more easily and safely access the elevated air handler. The project will consist of rerouting existing conduit to follow the air handler surfaces, cutting holes in existing walkway grating to allow for support column

  1. Microsoft Word - DOE-ID-INL-15-055.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Purchase, Installation and Training for a Friction Test Machine and an Impact Test Machine SECTION B. Project Description and Purpose: The purpose of this project is to procure, install, calibrate two energetic material sensitivity test machines then conduct on-site training and provide follow-up technical support for the machines. This equipment would be installed at Idaho Falls (IF)-682 (also identified as University Boulevard [UB]-3). Each project which produces

  2. Microsoft Word - DOE-ID-INL-14-024.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Idaho National Laboratory (INL) Sustainability Program 90-Day Guiding Principles Project SECTION B. Project Description: Idaho National Laboratory (INL) adopted the major programmatic sustainability goals contained in the Executive and Department of Energy (DOE) Orders and the Strategic Sustainability Performance Plan. Sustainability is a performance improvement strategy that is readily validated through performance measurement and reporting. INL Sustainability

  3. Femtosecond dark-field imaging with an X-ray free electron laser (CXIDB ID 19)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Martin, A. V.

    This data was collected as part of the same experiment as the data deposited in [ID16](id-16.html). Experiment details are given in [Loh, N.D. et al.](http://dx.doi.org/10.1038/nature11222)

  4. Femtosecond dark-field imaging with an X-ray free electron laser (CXIDB ID 19)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Martin, A. V.

    2012-08-25

    This data was collected as part of the same experiment as the data deposited in [ID16](id-16.html). Experiment details are given in [Loh, N.D. et al.](http://dx.doi.org/10.1038/nature11222)

  5. Microsoft Word - DOE-ID-13-023 Vanderbilt EC B3-15.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Development of a Nano-modified Concrete for Next Generation of Storage Systems - Vanderbilt University SECTION B. Project Description The goal of Vanderbilt University is to develop superior concrete for the long-term storage of used nuclear fuel by engineering concrete at the nanoscale through the incorporation of nano-sized and nano-structured particles based on enhanced reactivity. Tasks will include sample preparation, gamma irradiation at the ATR NSUF, exposure

  6. Microsoft Word - DOE-ID-14-069 Houston B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Upgrade of Universal Element Tester for Nuclear Energy Infrastructure Research- University of Houston SECTION B. Project Description The University of Houston proposes to purchase and install a computer control system and tele-participation computer system to upgrade the universal element tester that is used to perform biaxial or triaxial tests on full-size concrete elements with load-control and strain-control loading modes. The upgrade will allow further studies of

  7. Microsoft Word - DOE-ID-15-041 Wisconsin EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Radiation-induced Swelling and Microcracking in SiC Cladding for LWRs - University of Wisconsin SECTION B. Project Description The University of Wisconsin proposes to provide a fundamental basis for continuum models of swelling by measuring the distribution of defect clusters of all sizes and modeling their contribution to swelling and to combine the model of swelling with simulations of microstructural evolution to predict the effect of swelling on microcracking in

  8. Origin State>> CA CA ID ID IL KY NJ NM NY NY NV OH OH OH SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mix Wastew Treatment Project Argonne National Laboratory Paducah Gaseous Diffusion Plant Princeton Plasma Physics Laboratory Sandia National Laboratory Brookhaven National Laboratory West Valley Demonstration Project National Security Technologies, Inc. Mound Closure Project Portsmouth Gaseous Diffusion Plant Fernald Closure Project Savannah River Site BWXT Y-12 Plant Duratek Nuclear Fuels UT-Battelle Bechtel Jacobs Permafix M&EC EnergX (Foster Wheeler) Pantex Plant SOUTHERN I-15, CA-127,

  9. Origin State>> CA CA ID ID IL KY NJ NM NY NY NV OH OH OH SC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mixed Waste Treatment Project Argonne National Laboratory Paducah Gaseous Diffusion Plant Princeton Plasma Physics Laboratory Sandia National Laboratory Brookhaven National Laboratory West Valley Demonstration Project National Security Technologies, Inc. Mound Closure Project Portsmouth Gaseous Diffusion Plant Fernald Closure Project Savannah River Site BWXT Y-12 Plant Duratek Nuclear Fuels UT-Battelle Bechtel Jacobs Permafix M&EC EnergX (formerly Foster Wheeler) Pantex Plant SOUTHERN I-15,

  10. Microsoft Word - DOE-ID-INL-11-002.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Facility Construction and Modification in Support of the Material Security and Consolidation Project. SECTION B. Project Description: Additional onsite storage capabilities that meet anticipated security requirements are needed to support the accelerated processing of Experimental Breeder Reactor-II (EBR-II) spent nuclear fuel (SNF) and the potential growth of research and development activities. DOE is accelerating the processing of the highly enriched EBR-II SNF to

  11. Microsoft Word - DOE-ID-INL-11-003.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal SECTION B. Project Description The project will dismantle and remove the Specific Manufacturing Capability (SMC) refuse incinerator, the eighteen foot stack, and the associated propane tank system. All propane will be removed from the tank prior to physical removal. The incinerator is located on a cement slab approximately 20 meters northeast of building TAN-681 and is within the

  12. Microsoft Word - DOE-ID-INL-11-010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-010 SECTION A. Project Title: Special Manufacturing Complex (SMC) Line 1 Deactivation, Decontamination, and Decommissioning (DD&D) SECTION B. Project Description: This project proposes DD&D of Test Area North (TAN) 629, Line 1 to remove obsolete, out-of-service production equipment. Work will involve the removal of the inspection station, material transporters, laser water chiller, and laser. Associated electrical connections, utility piping, and localized ventilation will also be

  13. Microsoft Word - DOE-ID-INL-12-013.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed project would install new server equipment with associated uninterruptible power supplies (UPS's) and an additional air conditioning unit in the data room at the IAB (IF-606). The additional air conditioning (A/C) unit is needed to keep up with the load the new equipment requires.

  14. Microsoft Word - DOE-ID-INL-12-019.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: INL Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed project will install a new air conditioning unit in the INL Administration Building room 112. The new air conditioning system will handle the equipment heat loads within this room. Room 112 is an unclassified telephone room that is not normally occupied. This room has one supply air diffuser and one return air

  15. Microsoft Word - DOE-ID-INL-13-014.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Iona Relay Station Maintenance SECTION B. Project Description: This project would periodically perform maintenance related activities in and around an approximate 15 acre area at the Iona Hill Relay Station. Activities would include: maintenance/testing of the emergency generator, facility grounds and road surface repair and upkeep (e.g., grading, snow removal, resurfacing, weed control), building and structure maintenance/repair (e.g., painting, insect control,

  16. Microsoft Word - DOE-ID-INL-13-015.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) SECTION B. Project Description: The proposed project will relocate Homeland Security personnel who currently reside at TREAT to CITRC. The scope of this environmental checklist is only for the purchase and installation of three modular trailers. Three modular buildings are to be purchased

  17. Microsoft Word - DOE-ID-INL-13-021.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Description: Decommissioning of Shallow Injection Wells (SIW) (13-Test Reactor Area [TRA], 14-TRA, 21- TRA and 26-TRA) at the Advanced Test Reactor (ATR) Complex SECTION B. Project Description: This project will involve the decommissioning of the following Shallow Injection Wells (SIWs) at the Advanced Test Reactor (ATR) Complex: 13-TRA (Idaho Department of Water Resources [IDWR] Permit Number 34X0001020) located near the northeast corner of building TRA-614, 14-TRA (IDWR

  18. Microsoft Word - DOE-ID-INL-14-005.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-005 SECTION A. Project Title: MICROGRID DEMONSTRATION PROJECT SECTION B. Project Description: The current state of the United States (U.S.) electric grid is likely incapable of supporting the Department of Energy (DOE) goal of producing 80% of U.S. electricity from clean energy sources by 2035, as stated in the DOE Strategic Plan, May 2011. Supporting such a goal will require increased system flexibility to reliably integrate new, variable, and diverse resources. The energy generation

  19. Microsoft Word - DOE-ID-INL-14-009.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-009 SECTION A. Project Title: Irradiated Materials Characterization Laboratory (IMCL) Equipment Installation Project SECTION B. Project Description: The Department of Energy (DOE) has committed to multi-year funding to install Post Irradiation Examination (PIE) equipment into the Irradiated Materials Characterization Laboratory (IMCL) at the Materials and Fuels Complex (MFC) at Idaho National Laboratory (INL). The proposed action would install a number of capabilities/instruments in IMCL to

  20. Microsoft Word - DOE-ID-INL-14-013.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Zero Power Physics Reactor (ZPPR) Documented Safety Analysis (DSA) Implementation Project Tasks SECTION B. Project Description: The Zero Power Physics Reactor (ZPPR) Documented Safety Analysis (DSA) was conducted to verify that facility operations could be conducted without undue risk to the public or Materials and Fuels Complex (MFC) personnel. The DSA identified the need for implementation of the following tasks: 1. Replace 24 high-efficiency particulate air (HEPA)

  1. Microsoft Word - DOE-ID-INL-14-020.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SECTION A. Project Title: Central Facilities Area (CFA)-623/624 Electric Heat Conversion Project SECTION B. Project Description: The CFA-671 Boilers currently supply steam heat to buildings CFA-601, CFA-623 and CFA-674. Various problems such as steamline leaks/repairs, CFA-671 structural problems, age of the boilers, fuel costs, and upcoming 40 Code of Federal Regulations (CFR) 63 Subpart DDDDD regulations has led to the decision to replace the steam heat in these buildings with electric heat.

  2. Microsoft Word - DOE-ID-INL-14-034.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuels Complex (MFC)-765 Fuel Conditioning Facility (FCF) Fire Suppression System SECTION B. Project Description: The project scope consists of modifying three (3) separate sections of the FCF (MFC-765) Fire Suppression System to convert them from wet pipes to dry pipes. These modifications are required to comply with National Fire Protection Association (NFPA) requirements for maximum glycol/water ratios per NFPA 13 - Standard for the Installation of

  3. Microsoft Word - DOE-ID-INL-14-040.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Descriptive Information: Blackfoot Parking Lot Bus Entrance Modifications SECTION B. Project Description: The proposed project would create additional parking on, and an alternate entrance to, the Blackfoot parking lot on Idaho National Laboratory (INL) leased property in Blackfoot, Idaho. The purpose is to redirect the traffic flow of the buses coming into the parking lot to make it safer to pick-up and drop off bus passengers and to create additional parking spaces. The project

  4. Microsoft Word - DOE-ID-INL-14-051.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Materials and Fuels Complex (MFC)-768 Fire Suppression System Conversion SECTION B. Project Description: The project scope consists of modifying two (2) separate sections of the Power Plant (MFC-768) Fire Suppression System to convert them from wet pipes to dry pipes. These modifications are required to comply with National Fire Protection Association (NFPA) requirements for maximum glycol/water ratios per NFPA 13 - Standard for the Installation of Sprinkler Systems.

  5. Microsoft Word - DOE-ID-INL-14-057.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Materials and Fuels Complex (MFC)-765 Elevator Upgrade SECTION B. Project Description: The MFC-765 freight elevator is currently not operational and in an unsafe condition. The proposed project would upgrade the existing freight elevator with new controls/fixtures, jack pump unit, and doors. The elevator car, shaft, pit tracks, pit springs and pit would be reused. The proposed action would remove and replace the following elevator components: elevator control system,

  6. Microsoft Word - DOE-ID-INL-15-005.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Critical Infrastructure Test Range Complex (CITRC) - National and Homeland Security (N&HS) Electrical Upgrades to Power Burst Facility (PBF)-613 and Auxiliary Reactor Area (ARA)-632 SECTION B. Project Description: This project enhances the capabilities of PBF-613 and ARA-632 (Fillmore Test Facility) to support various electronics testing scenarios conducted as part of the Critical Infrastructure Test Range. The ARA-632 scope includes the installation of

  7. Microsoft Word - DOE-ID-INL-15-007.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Installation of Emergency Eyewash/Shower Station in Room B6 of the Radiochemistry Laboratory SECTION B. Project Description: The purpose of this project is to install a combination emergency eyewash/shower station in room B6 of the Radiochemistry Laboratory at the Materials and Fuels Complex (MFC) building MFC-1702. The emergency eyewash/shower station will provide a method of personnel decontamination. The eyewash/shower station will be a "water on demand

  8. Microsoft Word - DOE-ID-INL-15-027.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Materials and Fuel Complex (MFC)-785 Monorail System Upgrade SECTION B. Project Description: The proposed project would install a longitudinal support system on the north and south monorails along with a trolley and chain hoist in MFC- 785. The monorail sits in the walkway above the main cell (117) and decon cell (118) in the Hot Fuel Examination Facility (HFEF). The support system is needed to reinforce the monorail system so that it can handle the additional load

  9. Microsoft Word - DOE-ID-INL-15-028.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Advanced Test Reactor (ATR) Complex Street Lights Project SECTION B. Project Description: The ATR Complex street lighting has been taken out of service and needs to be replaced due to poor condition. An engineering inspection in October 2014 revealed numerous deficiencies with poles, guys, transformers, etc. The system was installed in 1965, is degraded and antiquated, and requires removal and replacement. The initial phase of the proposed action would remove the old

  10. Microsoft Word - DOE-ID-INL-15-039.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Idaho Falls (IF)-682 Magazine Storage Design and Installation Project SECTION B. Project Description: The purpose of this work is to build storage for explosive magazines. The proposed action would construct an addition, approximately 44' x 16' x 11' high, on IF-682 (see Figure 1). This addition would provide storage for materials used in production of research and development (R&D) materials, for storage of finished products, and allow for segregation of items as

  11. Microsoft Word - DOE-ID-INL-15-042.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Central Facilities (CF)-609 Emergency Command Center Upgrade SECTION B. Project Description and Purpose: The proposed project would modify the Emergency Command Center located in building Central Facilities Area (CFA)-609 room 169. These modifications include a new emergency control console system, carpet, air handling unit, associated piping and controls, concrete pad, condensers, and electrical modifications to support the new configuration. A trench duct would be

  12. Microsoft Word - DOE-ID-INL-15-054.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL-15-054 SECTION A. Project Title: Wireless Test Bed (WTB) Long-Term Evolution (LTE) Tier III Cell On Wheels Purchase, Installation, and Testing SECTION B. Project Description and Purpose: The Idaho National Laboratory (INL) Wireless Test Bed (WTB) would procure and install a long-term evolution (LTE) Tier III Cellular system. This project would support research and development conducted by organizations such as Idaho National Laboratory (INL) National & Homeland Security (N&HS), State

  13. Microsoft Word - DOE-ID-INL-15-057.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Materials and Fuels Complex (MFC)-774 Central Alarm Station (CAS) Remodel SECTION B. Project Description and Purpose: The proposed action would enlarge the MFC Central Alarm Station (CAS). The CAS would be hardened and remodeled to provide adequate room, utilities, and facilities for three fully manned Argus security system consoles and other controls as required. The project would include the following: 1. Expansion of the CAS, located in room B-12, to incorporate

  14. Microsoft Word - DOE-ID-INL-15-061.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    61 SECTION A. Project Title: Materials and Fuels Complex (MFC) Machine Shop Reconfiguration and Installation Project SECTION B. Project Description and Purpose: The Machine Shop at the Materials and Fuels Complex (MFC) building MFC-782 is undergoing an effort to better align its capabilities with current and future needs. To support this effort, the proposed action would reconfigure the machine shop to allow for better, more strategic work flow and to update machining capabilities via the

  15. Microsoft Word - DOE-ID-INL-15-063.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Test Reactor Area (TRA)-653 Machine Shop Reconfiguration and Equipment Installation Project SECTION B. Project Description and Purpose: In an effort to update capabilities and realign resources in support of future missions, the Advanced Test Reactor (ATR) machine shop in TRA-653 is being considered for a new Mazak VTC-800 machining center. The proposed scope of work includes removing several machining centers using various disposition paths including relocation in

  16. Microsoft Word - DOE-ID-INL-15-064.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Central Facilities Area (CF)-1611 Emergency Communication Center Electrical Reconfiguration SECTION B. Project Description and Purpose: The purpose of the proposed action is to improve power system reliability at Central Facilities Area (CFA) building 1611 (CF-1611) in order to meet code requirements. The proposed project would reconfigure the electrical setup in the CF-1611 Fire Station so that there is some redundancy with the system. This work would separate

  17. Microsoft Word - DOE-ID-INL-15-072.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Test Area North (TAN)-601 Fiber Optic Cable Installation SECTION B. Project Description and Purpose: Idaho National Laboratory (INL) needs additional fiber optic services at the Specific Manufacturing Capability (SMC). INL has a lease contract with Syringa Wireless, and Syringa wireless would perform the proposed action to extend fiber services at INL. The proposed service project would install approximately 2644 ft. of fiber optic cable from the TAN-601 Dial Room to

  18. Microsoft Word - DOE-ID-INL-16-010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Radioisotope Power System Heat Source Storage Project SECTION B. Project Description and Purpose: The Space Nuclear Power and Isotope Technologies Division at Idaho National Laboratory (INL) desires to transfer storage of seven assembled heat sources from the Space and Security Power System Facility (SSPSF) at the Materials and Fuels Complex (MFC) to building Chemical Processing Plant (CPP)-651 at the Idaho Nuclear Technology and Engineering Center (INTEC). Each heat

  19. Microsoft Word - DOE-ID-INL-16-012.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Advanced Test Reactor (ATR) Complex Road Repairs SECTION B. Project Description and Purpose: Certain roads inside the ATR Complex are in poor condition, have storm water drainage problems and are in need of repair. The proposed project would remove and replace portions of Swordfish Boulevard, Mackerel Street, and Bass Avenue. A portion of the drainage area along the east side of Swordfish Boulevard will be modified to include concrete valley gutters, catch basins, and

  20. Microsoft Word - DOE-ID-INL-16-014.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Idaho Falls (IF)-688 (Energy Innovation Laboratory [EIL]) B and C Wing Exhaust Access Platforms SECTION B. Project Description and Purpose: The Energy Innovation Laboratory (EIL), building IF-688, has temporary scaffolds installed around the roof top exhaust fans on wings B and C. These scaffolds are needed to perform maintenance on the exhaust fans. The proposed project would replace the temporary scaffolds with permanent access platforms. The temporary scaffolds

  1. Microsoft Word - DOE-ID-10-004.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: E-85 Fueling Systems for AMWTP and INTEC SECTION B. Project Description This project consists of installing two E-85 fueling systems (85 % ethanol and 15% petroleum based fuel) for fueling fleet vehicles. One system will be located at the Advanced Mixed Waste Treatment Project and the other at the Idaho Nuclear Technology Center. The two above ground, E85 compatible, double wall carbon steel, skid-mounted tanks have a capacity of 12,000 gallons each. The tanks will be

  2. Microsoft Word - DOE-ID-INL-13-012.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12 SECTION A. Project Title: Water Security Test Bed (WSTB) SECTION B. Project Description: This project was extensively described in Environmental Checklists (ECs) Idaho National Laboratory (INL)-13-014 (Overarching [OA] 5) and INL-13-014 Revision (R) 1 (OA 5). Upon review, it was determined that additional planning and detail was required to fully describe the project and associated activities. Both INL-13-014 and R1 to that EC are canceled; this EC will replace them. Future revisions may

  3. Microsoft Word - DOE-ID-INL-14-058.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Materials and Fuels Complex (MFC)-776 (Zero Power Physics Reactor [ZPPR]) Roof Repairs/ Replacement SECTION B. Project Description: The MFC-776 (ZPPR) roof has several areas that are cracking and needs to be repaired, and the roof eventually needs to be replaced. This project will repair/patch the damaged areas as part of a routine maintenance activity. In addition, project personnel have decided to run a field test on a product called Milliken CC8 Concrete Cloth to

  4. Microsoft Word - DOE-ID-INL-15-066.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and divert waste from disposal in the landfill when possible. The project would practice sustainable acquisition, as appropriate and practicable, by procuring construction...

  5. Microsoft Word - DOE-ID-INL-15-034.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The project would also include electrical additions including the addition of two transformers, panels, conduit, wiring, outlets and a new overhead cable tray. All the electrical...

  6. A short Id2 protein fragment containing the nuclear export signal forms amyloid-like fibrils

    SciTech Connect (OSTI)

    Colombo, Noemi [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany); Schroeder, Josef [Institut fuer Pathologie, Zentrales EM-Labor, Fakultaet fuer Medizin, Universitaet Regensburg, Franz-Josef-Strauss-Allee 11, 93053 Regensburg (Germany); Cabrele, Chiara [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany)]. E-mail: chiara.cabrele@chemie.uni-regensburg.de

    2006-07-21

    The negative regulator of DNA-binding/cell-differentiation Id2 is a small protein containing a central helix-loop-helix (HLH) motif and a C-terminal nuclear export signal (NES). Whereas the former is essential for Id2 dimerization and nuclear localization, the latter is responsible for the transport of Id2 from the nucleus to the cytoplasm. Whereas the isolated Id2 HLH motif is highly helical, large C-terminal Id2 fragments including the NES sequence are either unordered or aggregation-prone. To study the conformational properties of the isolated NES region, we synthesized the Id2 segment 103-124. The latter was insoluble in water and only temporarily soluble in water/alcohol mixtures, where it formed quickly precipitating {beta}-sheets. Introduction of a positively charged N-terminal tail prevented aggressive precipitation and led to aggregates consisting of long fibrils that bound thioflavin T. These results show an interesting structural aspect of the Id2 NES region, which might be of significance for both protein folding and function.

  7. Id-1 gene and gene products as therapeutic targets for treatment of breast cancer and other types of carcinoma

    DOE Patents [OSTI]

    Desprez, Pierre-Yves; Campisi, Judith

    2014-08-19

    A method for treatment of breast cancer and other types of cancer. The method comprises targeting and modulating Id-1 gene expression, if any, for the Id-1 gene, or gene products in breast or other epithelial cancers in a patient by delivering products that modulate Id-1 gene expression. When expressed, Id-1 gene is a prognostic indicator that cancer cells are invasive and metastatic.

  8. Origin State>> CA CA ID ID IL KY NJ NM NY NY NV OH OH SC TN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC TN TN TN TN TN TN TN TX Total Shipments by Route Lawrence Livermore National Laboratory Boeing/Rocketdyne Idaho National Labaratoy Advanced Mixed Waste Treatment Project Argonne National Laboratory Paducah Gaseous Diffusion Plant Princeton Plasma Physics Laboratory Sandia National Laboratory Brookhaven National Laboratory West Valley Demonstration Project National Security Technologies, Inc. Portsmouth Gaseous Diffusion Plant Fernald Closure Project Savannah River Site BWXT Y-12 Plant Duratek

  9. Deactivation, Decontamination and Decommissioning Project Summaries

    SciTech Connect (OSTI)

    Peterson, David Shane; Webber, Frank Laverne

    2001-07-01

    This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

  10. Microsoft Word - cg0915 Alum Carbothermic Tech DE-FC36-00ID139000.doc

    Office of Scientific and Technical Information (OSTI)

    2004 December 31 Cooperative Agreement No. DE-FC36-00ID13900 Aluminum Carbothermic Technology Final Technical Progress Report for the Period 2000 July through 2004 December Submitted to: U. S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, CO 80401 DOE/ID/13900 Aluminum Carbothermic Technology Submitted to: U. S. Department of Energy Cooperative Agreement Number DE-FC36-00ID13900 Submitted by: M. J. Bruno Alcoa Inc. 100 Technical Drive Alcoa Center, PA 15069-0001 Email:

  11. Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable

  12. Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable

  13. Microsoft Word - DOE-ID-15-047.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: New Gravel Parking Lot North of Idaho Falls (IF)-603 [Idaho National Laboratory (INL) Research Center (IRC)] SECTION B. Project Description and Purpose: . The proposed project would construct a gravel parking area north of the Idaho National Laboratory (INL) Research Center (IRC) Laboratory building IF-603. The location would be bounded by the east side of the landlord storage building (IF-610), the south side of the fence that is north of IF-610, the west side of the

  14. Microsoft Word - DOE-ID-INL-11-012.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: ATR Primary Heat Exchanger Seismic Capacity Project SECTION B. Project Description: Modification and upgrade of the seismic support structures for the five primary heat exchangers within ATR (670-M-2, 3, 4, 5 and 85) is needed to meet new PC-4 seismic criteria. The scope of the design is to replace the upper tie-rod assemblies and wall mounted anchor plates (the existing belly band on each heat exchanger will remain unchanged). The existing concrete structures that

  15. Microsoft Word - DOE-ID-INL-12-010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation SECTION B. Project Description: The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment. The 5 ton cooling unit and drycooler will be

  16. Microsoft Word - DOE-ID-INL-12-011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System SECTION B. Project Description: The purpose of this project is to provide a monorail system to aid maintenance personnel in the hoisting and transporting of the Advanced Test Reactor (ATR) Primary Coolant System (PCS) Safety Relief Valves, SF-A-1-71 and SF-A-1-72, in support of the 2 year replacement. The monorail system would consist of two independent monorail assemblies installed

  17. Microsoft Word - DOE-ID-INL-14-025.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Fiscal Year (FY)-14 Wireless Test Bed Fiber Optic Cable to Gate 1 and Experimental Breeder Reactor-I (EBR-I) Cell Sites SECTION B. Project Description: The purpose of this work is to install new fiber optic cable to support new wireless technology (4G) which will not work as well on existing microwave backhaul technology. Future projects using the new cable will be separately documented. New fiber optic cables would be installed between the Idaho National Laboratory

  18. Microsoft Word - DOE-ID-INL-14-036.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Green Room Mill Replacement Project SECTION B. Project Description: The proposed action would replace the Bridgeport mill in the Green Room at the Advanced Test Reactor (ATR) with the Sharp mill that is currently located in building Test Reactor Area (TRA)-653 (south east side) at the ATR Complex. The Sharp mill located in TRA-653 (south west side) would be relocated to the south east side to replace the Sharp mill being moved to the Green Room. The Bridgeport mill

  19. Microsoft Word - DOE-ID-INL-14-052.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    52 SECTION A. Project Title: Replacement of Breakers 22, 23, 25 within switchgear 670-E-3 and addition of motor starters in Test Reactor Area (TRA)-671 SECTION B. Project Description: The purpose of the proposed action is to replace the two Utility Coolant Pump circuit breakers, located in switchgear 670-E-3 cubicles 22 and 23, and the Diesel/Bus feeder circuit breaker, located in switchgear 670-E-3 cubicle 25. These three circuit breakers would be replaced with vacuum circuit breakers. Project

  20. Microsoft Word - DOE-ID-INL-14-056.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Advanced Test Reactor (ATR) Complex Landscaping SECTION B. Project Description: The proposed project will replace some of the existing landscape at ATR Complex with a more sustainable Xeriscape landscape. There will be four areas at ATR Complex that will be re-landscaped. Area #1 would be around building Test Reactor Area (TRA)-658 and near the front entrance area of ATR Complex, Area #2 would be primarily the grass area that runs from building TRA-658 north to Cod

  1. Microsoft Word - DOE-ID-INL-15-040.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Radiological Glovebox Research Activities at Central Facilities Area (CFA)-625 SECTION B. Project Description: This work began at the Test Reactor Area (now Advanced Test Reactor Complex) at Idaho National Laboratory (INL) under Environmental Checklist (EC) INL-07-048 (OA 6). Work was subsequently moved to the Central Facilities Area building CFA-625 under EC INL-10-001 (OA 6). This EC is written as part of a routine project review and replaces INL-10-001 (OA 6). The

  2. Microsoft Word - DIOE-ID-INL-14-026.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Radiochemistry Laboratory (RCL) Supply Intake Filter Housing SECTION B. Project Description: The Radiochemistry Laboratory (RCL) air supply system does not adequately filter the fresh air drawn into the facility. Additional filtration on the fresh air supply is needed. The proposed action includes the following:  Add filter housing to RCL supply system which would be capable of 12,000 actual cubic feet per minute (ACFM).  Add differential gauges across the

  3. Microsoft Word - DOE-ID-10-005.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: CPP-663 HVAC Systems Upgrade SECTION B. Project Description The scope of work will be to repair and/or replace the existing heating, ventilation, and air conditioning system located in building CPP-663 at the Idaho National Engineering Laboratory. The scope will be to repair the existing system or identify an energy efficient replacement to the existing system and place an NFPA 70E code compliant electrical metering system that will monitor building electrical usage.

  4. Microsoft Word - DOE-ID-12-020.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20 SECTION A. Project Title: ZPPR Surveillance Glovebox SECTION B. Project Description: The purpose of the proposed action is to limit exposure hazards and better contain airborne hazards, beyond current capabilities, associated with performing surveillance, characterization, and repackaging activities for transuranic materials in the Zero Power Physics Reactor (ZPPR) workroom hoods. In order to meet this purpose and need, the Transuranic Surveillance Glovebox (TSG) would be installed. This

  5. Microsoft Word - DOE-ID-14-042.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SECTION A. Project Title: National Cybersecurity and Communications Integration Center (NCCIC)/Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Idaho High Frequency (HF) Shared Resources (SHARES) Station SECTION B. Project Description: The purpose of this work is to construct a new Department of Homeland Security (DHS) High Frequency (HF) Shared Resources (SHARES) Station at the Idaho National Laboratory (INL) behind the Systems Analysis Facility (SAF; Idaho Falls [IF]-627)

  6. Microsoft Word - DOE-ID-INL-10-021.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    21 SECTION A. Project Title: Geotechnical Investigation for INL Remote-Handled Low-Level Waste Disposal SECTION B. Project Description: The proposed action would conduct geotechnical investigations at two 4-6 acre candidate sites for a Remote-Handled Low-Level Waste (RH LLW) Facility at the Idaho National Laboratory (INL). One site is located southwest of the Advanced Test Reactor (ATR)-Complex and the other site is located west of and across Lincoln Blvd. from the Idaho Comprehensive

  7. Microsoft Word - DOE-ID-INL-11-008.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Parking area expansion along road to Range #7 SECTION B. Project Description: Additional parking is needed during breacher training and other demonstration activities on range #7 to accommodate access by emergency response vehicles. Historically, participants have parked their vehicles on the gravel road leading to range #7 which restricts access to emergency response vehicles. The proposed action is to "grub" out an area of approximately 0.06 acres (about

  8. Microsoft Word - DOE-ID-INL-11-013.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Modifications to Central Facilities Area (CFA)-Live Fire Range and Main Gate Drinking Water SECTION B. Project Description: Modification of the drinking water systems at the CFA Live Fire Range and Main Gate is needed to improve water quality. The drinking water chlorinator at the Live Fire Range does not function properly and cannot be modified or repaired. Personnel at the facility have been using bottled drinking water for several years. There is no disinfection at

  9. Microsoft Word - DOE-ID-INL-11-014.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Advanced Test Reactor Core Internals Changeout (CIC) Outage - 2015 SECTION B. Project Description: The proposed action will provide for the sixth core internals changeout (CIC) outage of the Advanced Test Reactor (ATR), which is housed in building Test Reactor Area (TRA)-670, located at the Idaho National Laboratory (INL) ATR Complex. Activities scheduled during the CIC outage include the changeout of components in the high-flux region of the ATR core and support

  10. Microsoft Word - DOE-ID-INL-12-002.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Underground Storage Tank (UST) Steel Line Replacements SECTION B. Project Description: The Idaho Department of Environmental Quality (DEQ) performed an inspection of Idaho National Laboratory's (INL's) USTs in September of 2011. Inspection results indicated field violations for failing to install and maintain cathodic protection systems for steel lines associated with seven underground storage tanks. DEQ did not accept the INL's "corrosion expert"

  11. Microsoft Word - DOE-ID-INL-12-005.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Descriptive Information: Central Facilities Area (CFA) Shoot House Panel Installation SECTION B. Project Description: The existing shoothouse facility (Figure 1) provides little to no wind protection for trainers and observers. Trainers and observers stand in an elevated position that is mostly exposed to blowing winds. This project will install 10 new fiberglass panels (22' to 23' X 4' to 5') on the existing building to inhibit the wind and improve the usability of the facility.

  12. Microsoft Word - DOE-ID-INL-13-005.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Land Mobile Radio - Bi Directional Amplifier (BDA) Installation SECTION B. Project Description The INL has contracted with White Cloud Communications to provide Land Mobile Radio Services for emergency first responders under a managed service contract. The contract includes provisions for area coverage and quality of service. Testing of the installed Radio Frequency backbone system revealed that certain buildings at the INL do not have adequate coverage. The

  13. Microsoft Word - DOE-ID-INL-13-016.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Wildland Fire Chainsaw Training SECTION B. Project Description: The Idaho National Laboratory (INL) fire department is required by the National Wildfire Coordinating Group (NWCG) to have chainsaw packages on each of the Type 4 wildland fire engines. Prior to placing these chainsaws into service, the INL fire department must train firefighters to chainsaw operational and safety protocols, including both classroom and hands-on training in the field. To enable realistic

  14. Microsoft Word - DOE-ID-INL-13-020.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF) SECTION B. Project Description: Currently, dedicated space is unavailable for above-grade storage of Interim Storage Containers (ISCs) containing 55-gal drums of remote handled transuranic waste (RH-TRU). In the past this waste was packaged in specially constructed liners and placed into the RSWF. When ready for transfer this waste would then be removed from

  15. Microsoft Word - DOE-ID-INL-13-022.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-022 SECTION A. Project Title: Global Threat Reduction Initiative (GTRI) Irradiated Experiment Shipping Capability SECTION B. Project Description: The General Electric (GE) 2000 Model Cask is currently used to support the Global Threat Reduction Initiative (GTRI) irradiated experiment shipments from the Advanced Test Reactor (ATR) at Idaho National Laboratory's (INL) ATR Complex to the Hot Fuel Examination Facility (HFEF) at INL's Materials and Fuels Complex (MFC). However, due to changes in

  16. Microsoft Word - DOE-ID-INL-13-024.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24 SECTION A. Project Title: Idaho National Laboratory (INL) Road Sign Installation/Maintenance SECTION B. Project Description: The proposed action is to install new and repair/replace existing road signs and delineator/reflector poles as needed near paved roads and Priority 1 and 2 unpaved roads (as defined in Environmental Checklist (EC) Idaho National Engineering Laboratory (INEL)-02-024) throughout the INL as part of routine maintenance and to improve traffic safety. This includes roads

  17. Microsoft Word - DOE-ID-INL-13-027.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    27 SECTION A. Project Title: Excess Facilities Deactivation and Demolition SECTION B. Project Description: The purpose of the proposed action is to deactivate, decontaminate, and demolish (DD&D) surplus vacant, inactivated, or soon to be inactivated facilities to reduce lifecycle costs associated with surveillance and maintenance. The proposed action would return the location of the facilities to near original condition. There is limited risk to site personnel posed by remaining hazards

  18. Microsoft Word - DOE-ID-INL-14-002.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Erection and Use of Tension Fabric Structure at the National Security Test Range (NSTR) SECTION B. Project Description: This Environmental Checklist (EC) addresses the erection and use of a tension fabric structure at the National Security Test Range (NSTR). A tension fabric structure is a non-permanent tent-like structure. The tension fabric structure would be placed in the second laydown area at the NSTR and provide personnel with a work area somewhat protected from

  19. Microsoft Word - DOE-ID-INL-14-008.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Relocation of Environmental Monitoring Services Personnel and Equipment SECTION B. Project Description: The Environmental Monitoring Services organization at Idaho National Laboratory (INL) is currently located at the Materials and Fuels Complex (MFC) in building MFC-721, the original Transient Reactor Test Facility (TREAT) Reactor Control Building. The TREAT reactor has been in stand-by mode since 1995, and MFC-721 was converted in to office space and a sample

  20. Microsoft Word - DOE-ID-INL-14-010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 SECTION A. Project Title: Hot Fuels and Examination Facility (HFEF) Documented Safety Analysis (DSA) Implementation Tasks SECTION B. Project Description: The Hot Fuels Examination Facility (HFEF) (MFC-785) Documented Safety Analysis (DSA) was upgraded in compliance with DOE- STD-3009 to verify that facility operations could be conducted without undue risk to the public or MFC personnel. The full implementation of the DSA requires procedure and software modifications and implementation of the

  1. Microsoft Word - DOE-ID-INL-14-016.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant Pump Motor Starters Replacement SECTION B. Project Description: The proposed action would replace the existing ATR Primary Coolant Pump circuit breakers located in Switchgear 670-E-1 Cubicle 3 & 4 and Switchgear 670-E-2, Cubicles 9 and 10 with Vacuum Starters specifically designed for motor starting applications. Replace the existing electrically operated auxiliary relay with a new electrically operated auxiliary relay

  2. Microsoft Word - DOE-ID-INL-14-023.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-023 SECTION A. Project Title: Materials and Fuels Complex (MFC) Fire Water Replacement and Upgrades SECTION B. Project Description: The existing combined fire/potable water supply and distribution system at Materials and Fuels Complex (MFC), including the Transient Reactor Test Facility (TREAT), has been identified as being unreliable since a single fault can prevent the system from operating as required. Additionally, the fire water supply to TREAT has also been found inadequate based upon

  3. Microsoft Word - DOE-ID-INL-14-031.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Energy Systems Laboratory Process Demonstration Unit Pellet Mill Exhaust Stack Installation SECTION B. Project Description: . The proposed action is needed to allow operation of the Process Demonstration Unit (PDU) at the Energy Systems Laboratory (ESL) (Idaho Falls [IF]-685). Bioenergy research and development (R&D) activities/operations that take place at the ESL have been captured in environmental checklist Idaho National Laboratory (INL)-10-003. Environmental

  4. Microsoft Word - DOE-ID-INL-14-035.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Cold Waste Outdoor Pump Site System Upgrade SECTION B. Project Description: The proposed action would install new replacement equipment as part of upgrades to Test Reactor Area (TRA0-703 (Advanced Test Reactor [ATR] Cold Waste Pit) to achieve more system reliability and to address safety concerns. The current system utilizes a single motor starter cabinet (with three motor starters), push buttons, water level monitoring/pump control float type system and relays to

  5. Microsoft Word - DOE-ID-INL-14-037.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Materials and Fuel Complex (MFC) Ladder and Platform Modifications SECTION B. Project Description: The scope of work is to modify, replace, or remove fixed ladders and platforms at various locations at MFC that do not meet safety requirements including:  MFC-785 Hot Fuel Examination Facility (HFEF) o Exterior Stack Platform Modification o Exterior South Second Level Ladder o Interior Basement ROV-3 Ladder and Platform o Interior Basement Generator Room Ladder o

  6. Microsoft Word - DOE-ID-INL-14-038.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-038 SECTION A. Project Title: Research and Development Activities at the Idaho National Laboratory (INL) Site Facilities (Overarching) SECTION B. Project Description: The proposed action would perform analytical and research and development (R&D) activities in numerous laboratories and R&D facilities located at the Idaho National Laboratory (INL), including INL facilities located at the Advanced Test Reactor (ATR) Complex, Central Facilities Area (CFA), Idaho Nuclear Technology and

  7. Microsoft Word - DOE-ID-INL-14-039.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Idaho Falls (IF)-639 (North Holmes Laboratory [NHL]) Machine Installation SECTION B. Project Description: The North Holmes Laboratory (NHL, IF-639) Machine Shop requires several large turning centers and milling machines. The proposed action would relocate five existing machines within the facility, in order to provide sufficient space for two additional (new) turning centers and milling machines. These machines will require electrical feeds and receptacles, as well

  8. Microsoft Word - DOE-ID-INL-14-041.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Loop 2E Pressurizer Repair or Replacement SECTION B. Project Description: The Advanced Test Reactor (ATR) Loop 2E-NW Pressurizer 2E-M-10 is a vertical and cylindrical vessel with standard American Society of Mechanical Engineers (ASME) elliptical heads and five (5) radially arranged side arms attached on the vessel exterior below the minimum water level. Each side arm accommodates clamp-on type heaters. The pressurizer vessel contains primary coolant and maintains a

  9. Microsoft Word - DOE-ID-INL-14-048.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Repair of Sewer System Near Southeast Corner of Test Reactor Area (TRA)-670 SECTION B. Project Description: The sanitary sewer system near the southeast corner of TRA-670 (reactor building) is expelling sewer gases (detected by odor) in the first basement, is experiencing corrosion after many years of service, and some of the configuration does not meet current code. Modify the Advanced Test Reactor (ATR) sanitary sewer system to expel sewer gases to the outside of

  10. Microsoft Word - DOE-ID-INL-14-049.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Process Demonstration Unit (PDU) Fueling Station SECTION B. Project Description: The purpose of this work is to install a fuel storage unit adjacent to the Energy Systems Laboratory (ESL) in support of Process Demonstration Unit (PDU) operations. Routine PDU operations include operation of fork lifts and tele-handlers. This equipment uses both gasoline and diesel fuels. Historically, a local fuel retailer has fueled the equipment directly on a periodic basis. The pace

  11. Microsoft Word - DOE-ID-INL-14-053.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Materials and Fuels Complex (MFC)-752 Analytical Laboratory B103 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed action would upgrade the ventilation system ducting, high-efficiency particulate air (HEPA) filter housings, fume hoods, and steam coils in the MFC-752 B103 Laboratory. The upgrade would include 1) installation of a heating, ventilating, and air conditioning (HVAC) control system that would interface

  12. Microsoft Word - DOE-ID-INL-14-055.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Remote-Handled (RH)-Transuranic (TRU) Cell Outpack Modifications SECTION B. Project Description: The purpose of the proposed action is to simplify shipping of remote-handled transuranic (RH-TRU) waste from the Materials and Fuels Complex (MFC) at Idaho National Laboratory (INL) to the Waste Isolation Pilot Plant (WIPP). Therefore, modification to processes, as described in this environmental checklist, is needed. Real-time radiography (RTR) must be conducted prior to

  13. Microsoft Word - DOE-ID-INL-15-001.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Removal of Flat Bars Around Test Reactor Area (TRA)-671 Cold Well Screens. SECTION B. Project Description: The proposed action would remove the metal strips around TRA-671 cold well screens (see Figure 1) that pose a tripping hazard. The metal strips are coated with suspect polychlorinated biphenyl (PCB) paint. Work would consist of prying the metal strips from the cold well screen framework or stripping suspect PCB paint from metal strips then removing the strips by

  14. Microsoft Word - DOE-ID-INL-15-002.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Training Research Isotope (General Atomic) [TRIGA] Eutectics Evaluation SECTION B. Project Description: Fuel element temperature is a safety parameter for TRIGA reactors. High-temperature limits are established to mitigate loss of cladding confinement and the subsequent release of fission products. For some TRIGA reactors, a Loss of Coolant Accident (LOCA) is postulated where the fuel element temperatures could exceed safe levels. It is postulated that excessive

  15. Microsoft Word - DOE-ID-INL-15-004.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Process Demonstration Unit (PDU) Support Structure SECTION B. Project Description: The Process Demonstration Unit (PDU) is a modular feedstock pre-processing system to study ways to densify and stabilize materials including wheat straw, barley straw, corn stover, wood products and other biomaterials into a feedstock for biorefineries. The PDU is located at the Energy Systems Laboratory (ESL [IF-685]) at Idaho National Laboratory's (INL's) Research and Education Campus

  16. Microsoft Word - DOE-ID-INL-15-010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Advanced Test Reactor Air Conditioning Upgrades SECTION B. Project Description: The proposed action will replace the air conditioning (AC) units in multiple areas located within the Advanced Test Reactor (ATR) [Test Reactor Area (TRA)-670]. The units considered for replacement are the following: AC units in Reactor Data Acquisition System (RDAS) rooms 110 and 111: Scope consists of replacing the three (3) equipment cooling AC units with four (4) new and more efficient

  17. Microsoft Word - DOE-ID-INL-15-011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11 SECTION A. Project Title: SAM-1 Hydraulic Shuttle Irradiation System (HSIS) Experiments SECTION B. Project Description: The purpose of the SAM-1 experiment is to populate a sample library to obtain data for low fluences of metallic fuels. Fuel for the proposed action would be manufactured from Department of Energy (DOE)-owned depleted uranium. Following irradiation in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL), the samples would be available for post-irradiation

  18. Microsoft Word - DOE-ID-INL-15-011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Wireless Test Bed Antennas at Energy Innovations Laboratory SECTION B. Project Description and Purpose: The proposed action would install high frequency (HF) antennas on the roof of the Energy Innovations Laboratory (EIL) and on the ground near EIL in support of the Wireless Test Bed. This Environmental Checklist (EC) covers installation and removal activities; it does not cover the research and development (R&D) activities conducted using the antennas. Each

  19. Microsoft Word - DOE-ID-INL-15-014.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Test Reactor Area (TRA)-609 Switchgear Replacement, Rollup Door Installation, and Diesel Removal SECTION B. Project Description: TRA-609 houses the air compressors and much of the electrical switchgear for equipment in the outer area of the Advanced Test Reactor (ATR). The switchgear equipment is nearing the end of its useful life and needs to be replaced. The proposed work scope is to replace the electrical switchgear with a new, functionally equivalent piece of

  20. Microsoft Word - DOE-ID-INL-15-020.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Replacement of Test Reactor Area (TRA)-671 Chemistry Monitoring Unit and Modification of Piping and Components SECTION B. Project Description: Nalco has been awarded the secondary chemistry support contract for the Advanced Test Reactor (ATR). To implement the Nalco chemistry program, the following replacements and modifications must be made to the ATR Cooling Tower Pumphouse (TRA-671): 1. The chemistry monitoring unit in TRA-671 pump room would be replaced with a new

  1. Microsoft Word - DOE-ID-INL-15-021.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    21 SECTION A. Project Title: Materials and Fuel Complex (MFC)-752 Analytical Laboratory Main Stack Modifications for Sample Probe Replacement SECTION B. Project Description: The proposed action is to install two 4" inspection/velocity traverse ports approximately 2' below the existing sample probe port as part of the engineering job (EJ-1684) and to replace the existing sample probe with a new one (that will sample isokinetically). Inspections are not currently required, so no ports exist.

  2. Microsoft Word - DOE-ID-INL-15-022.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Idaho National Laboratory (INL) Fire Stations' Vehicle Exhaust Extraction Systems Replacement SECTION B. Project Description: The vehicle exhaust extraction systems at the INL Fire Stations (Central Facilities Area [CFA-1611], Materials and Fuels Complex [MFC]-725, and Test Area North [TAN]-687) are over 15 years old and not working as originally intended. Because of this inadequate system, personnel in the buildings are continually exposed to diesel exhaust fumes.

  3. Microsoft Word - DOE-ID-INL-15-023.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    23 SECTION A. Project Title: Central Facilities Area (CFA) Live Fire Range Fiber Optic Connection SECTION B. Project Description: The CFA Live Fire Range currently does not have fiber optic cable connectivity to support daily operations. Fiber optic cable was recently installed at a power pole adjacent to the Gate 3 Guard Post to support National & Homeland Security Wireless Test Bed capabilities, and it has sufficient capacity to support some connectivity to the CFA Live Fire Range. This

  4. Microsoft Word - DOE-ID-INL-15-030.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: This environmental checklist (EC) replaces EC INL-10-069. The purpose of this overarching EC is to address activities that would meet the intent of the Categorical Exclusion (CX) B1.3 as described in 10 Code of Federal Regulation (CFR) 1021, Appendix B to Subpart D. These activities include routine maintenance and custodial services required to support safe

  5. Microsoft Word - DOE-ID-INL-15-031.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Central Facilities Area (CFA) Sewage Treatment System Lagoon #3 and Land Application Site Closure SECTION B. Project Description: The CFA Sewage Treatment Plant (STP) has been operating under Wastewater Reuse Permits (WRPs) (formerly Wastewater Land Application Permits) since it began operation. Treated wastewater was discharged to the land application site (73.5 acres) by pumping wastewater from Lagoon #3, which is a 0.5 acre polishing lagoon, through a pivot

  6. Microsoft Word - DOE-ID-INL-15-032.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Advanced Test Reactor (ATR) Cold Waste Collection Tank 670-M-186 Vessel Replacement SECTION B. Project Description: The 670-M-186 vessel to the ATR cold waste collection tank has a history of developing leaks. Ultrasonic thickness testing performed on the vessel found excessive wall thinning due to corrosion. The technical evaluation completed in 2015 determined the vessel needs to be replaced. The proposed action would replace the 670-M-186 vessel with a new

  7. Microsoft Word - DOE-ID-INL-15-036.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Lab A19 Cleanroom Construction SECTION B. Project Description: The international Neutrino Ettore Majorana Observatory (NEMO) collaboration of scientists is studying the process of nuclear double- beta decay to study the properties of the neutrino. Double-beta decay half-lives are the order of 1E20 years, or longer, and very sensitive measurements are conducted underground to shield against cosmic rays and with ultrapure materials, including mass- separated isotopes.

  8. Microsoft Word - DOE-ID-INL-15-038.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Central Facilities Area (CFA) and Materials and Fuels Complex (MFC) Live Fire Range Modifications SECTION B. Project Description: The principle purpose of the live fire facilities at Idaho National Laboratory (INL) is to provide firearms and tactical training/qualification requirements for Protective Force Personnel. Live fire facilities are located at the Central Facilities Area (CFA) and the Materials and Fuels Complex (MFC). Training activities at the live fire

  9. Microsoft Word - DOE-ID-INL-15-041.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Safety and Tritium Applied Research (STAR) Standby Power Upgrade SECTION B. Project Description: The Safety and Tritium Applied Research (STAR) facility, located in building Test Reactor Area (TRA)-666 at Idaho National Laboratory's (INL's) Advanced Test Reactor (ATR) Complex, conducts tritium research via confinement systems that rely on once- through building and experiment ventilation which is exhausted to a stack. The building does not have standby power and

  10. Microsoft Word - DOE-ID-INL-15-043.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: INL Helicopter Training SECTION B. Project Description and Purpose: The proposed action would perform training exercises using two UH-60 "Blackhawk" helicopters at the Idaho National Laboratory (INL) desert site in late July 2015. Data collection would occur during aerial portions of the testing, and the aircraft would operate within a flight zone determined by INL. The proposed action would require multiple landings of the helicopters to deliver data to

  11. Microsoft Word - DOE-ID-INL-15-044.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuel Complex (MFC)-752 Analytical Laboratory Argon Relief Valve and Flow Meter Installation SECTION B. Project Description and Purpose: The proposed action would replace the Materials and Fuels Complex (MFC) building MFC-752 Analytical Laboratory (AL) argon header rupture disc (LAR1- PSE-109) with a relief valve to prevent argon loss from the system in an over-pressure event. Previously, when the rupture disc ruptured, all argon was relieved from the

  12. Microsoft Word - DOE-ID-INL-15-050.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Plant Protective System (PPS) Battery Rooms Exhaust Fans Replacement SECTION B. Project Description and Purpose: The Plant Protective System (PPS) Battery Room Exhaust Fans 670-HVE-1538 and 1539, located on the Test Reactor Area (TRA)-670 diesel generator room, have reached the end of their useful life and replacement parts are obsolete. The fans provide ventilation to maintain hydrogen gases below National Fire Protection Association lower explosive limit

  13. Microsoft Word - DOE-ID-INL-15-051.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Central Facilities Area (CFA)-753 and CFA-703 Demolition SECTION B. Project Description and Purpose: The Central Facilities Area (CFA) Building 753 (CFA-753) water storage tank was emptied and piping disconnected in approximately 2005. The age (built in 1952) and poor condition of the tank led facility personnel to go to a single tank (CFA-782) storage system. It was determined that CFA-782 had adequate capacity to meet both potable and fire water needs for CFA.

  14. Microsoft Word - DOE-ID-INL-15-062.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Remove Radioactive Liquid Waste Treatment Facility Truck Loading Station Outside of the Hot Fuel Examination Facility SECTION B. Project Description and Purpose: The Radioactive Liquid Waste Treatment Facility (RLWTF) truck loading station located on the northwest exterior of Hot Fuel Examination Facility (HFEF) is no longer used. The vent and pump discharge piping (two lines) penetrate the foundation wall approximately three feet below grade in a pit. During

  15. Microsoft Word - DOE-ID-INL-15-065.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Relocate Tent Structure from Idaho Nuclear Technology and Engineering Center (INTEC) to Materials and Fuels Complex (MFC) SECTION B. Project Description and Purpose: In 2014, CH2M-WG Idaho, LLC (CWI) erected a temporary tension fabric structure at INTEC on the south side of building Chemical Processing Plant (CPP)-666. The structure was used by CWI as a temporary containment to facilitate replacement of the CPP-666 IX Column Resin (Davis Bacon Case Record No. Idaho

  16. Microsoft Word - DOE-ID-INL-15-067.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Microgrid Research Laboratory Remodel SECTION B. Project Description and Purpose: The Microgrid Research Laboratory is located in the Energy Systems Laboratory (ESL), building IF-685, at the Idaho National Laboratory's Research and Education Campus in Idaho Falls, Idaho. The Microgrid Research Laboratory Remodel would provide a cosmetic and functional upgrade to the existing workspace. The upgrades would accommodate the users of the space, visitors and tour groups.

  17. Microsoft Word - DOE-ID-INL-15-068.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Description: Test Reactor Area (TRA)-1608 Water Fountain Replacement SECTION B. Project Description and Purpose: Two drinking fountains at the Advanced Test Reactor Complex building TRA-1608 developed a water leak and had to be removed. The proposed action would replace the water fountains with two ELKAY model LZSTL8WSSP water fountains. The new water fountains have an attached bottle filling station to deliver a clean, quick water bottle fill which enhances sustainability

  18. Microsoft Word - DOE-ID-INL-15-074.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuels Complex (MFC)-1741 Modular Guard Station SECTION B. Project Description and Purpose: Security personnel inside the fences at the Zero Power Physics Reactor (ZPPR) at the Materials and Fuels Complex (MFC) building 775 use vehicles to maintain continuous watch of the ZPPR complex. The proposed action would install a new guard station building to house this security need. The proposed building would sit inside the fenced area, east of MFC-784. The

  19. Microsoft Word - DOE-ID-INL-15-078.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Warm Waste Effluent Radiation Monitor and Transfer Pump M-54 Recirculation Evaluation and Modification SECTION B. Project Description and Purpose: The Effluent Radiation Monitor (ERM) in building Test Reactor Area (TRA)-605 at the Advanced Test Reactor (ATR) Complex experiences filter plugging after a short operating period. This restricts flow to the detector chamber and causes the pumps to shut off. Therefore, the ERM unit needs to be replaced. The unit currently

  20. Microsoft Word - DOE-ID-INL-16-003.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Test Area North (TAN)-614 Potable Water Pump Replacement SECTION B. Project Description and Purpose: The TAN-614 potable 75 hp water pump has become unreliable, fails on occasion and needs to be replaced. The proposed action would remove the old potable water pump, associated parts (motor, controller, starter, etc.) and the interlock between the potable water pump and fire pump and replace them with new components. Specifically this work will include the following:

  1. Microsoft Word - DOE-ID-INL-16-004.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Critical Infrastructure Test Range Complex (CITRC) High Frequency Test Bed (HFTB) Expansion SECTION B. Project Description and Purpose: The proposed action would provide National & Homeland Security (N&HS) personnel with a new field station office near the Safety Test Facility (STF)/Critical Infrastructure Test Range Complex (CITRC) area located off of Arthur Boulevard. The scope of this environmental checklist (EC) covers the purchase, installation, and use

  2. Microsoft Word - DOE-ID-INL-16-006.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Test Reactor Area (TRA)-670 Primary Pump Pit Platform SECTION B. Project Description and Purpose: The primary pump pit platforms have clearance issues. There is not enough space in between the hatch wall and the ladder and not enough space between the ladder and the safety rails on the pump pit platform. This causes problems for personnel accessing and egressing the pump pits. The purpose of this work scope is to alleviate the clearance issues described above by

  3. Microsoft Word - DOE-ID-INL-16-007.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Idaho National Laboratory Site Characterization and Environmental Monitoring (Overarching) - Revision 2 SECTION B. Project Description and Purpose: The purpose of the revision to this environmental checklist (EC) is to update activities allowed and to capture new requirements. The proposed action would include site-wide sampling, monitoring, and characterization activities at the Idaho National Laboratory (INL). Site-wide sampling, monitoring, and characterization

  4. Microsoft Word - DOE-ID-INL-16-008.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Installation of New Ice Machine in Test Reactor Area (TRA)-628 SECTION B. Project Description and Purpose: The proposed action would procure and install a new ice machine in TRA-628. The drinking fountain would be removed and the new ice machine installed in the same location using the same water supply, drain and electrical service. SECTION C. Environmental Aspects or Potential Sources of Impact: Generating and Managing Waste Maintenance activities may generate a

  5. Microsoft Word - DOE-ID-INL-16-009.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: U.S. High Performance Research Reactor Fuel Development Post Irradiation Examination SECTION B. Project Description and Purpose: The purpose of the first revision to this environmental checklist (EC) (see Idaho National Laboratory [INL]-13-039 R1) was to capture the work activities and environmental aspects of additional Post Irradiation Examination (PIE) activities, specifically dissolution of aluminum cladding and bend testing in the Hot Fuels Examination Facility

  6. Microsoft Word - DOE-ID-INL-16-013.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Irradiated Materials Characterization Laboratory (IMCL) Ventilation Modifications SECTION B. Project Description and Purpose: The Materials and Fuels Complex (MFC) Irradiated Materials Characterization Laboratory (IMCL), building MFC-1729, was constructed and placed into operational status approximately two years ago. During this period, operational experience has shown that air flow across the laboratory is minimal and does not meet expectations for radiological

  7. Microsoft Word - DOE-ID-INL-16-015.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Power Burst Facility (PBF)-638 and Central Facilities (CF)-617 Manual Transfer Switch Installation SECTION B. Project Description and Purpose: Currently, there are no alternate means to power facilities PBF-638 and CF-617 in the event of commercial power loss. Modification and installation of manual transfer switches (MTSs) would allow the ability to switch over to diesel generator during a loss of commercial power. The proposed action would install MTSs for the two

  8. YEAR","UTILITY_ID","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","A

    U.S. Energy Information Administration (EIA) Indexed Site

    UTILITY_ID","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","AMOUNTS","DESCRIPTION" 2001,298,"Alexandria City of",6558,"DG Hunter",9,"Line 1","STEAM","Kind of Plant" 2001,298,"Alexandria City of",6558,"DG Hunter",9,"Line 2",1956,"Year Originally Constructed" 2001,298,"Alexandria City of",6558,"DG

  9. Step 3: Project Refinement

    Energy Savers [EERE]

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  10. File:08-ID-c - Certificate of Public Convenience and Necessity...

    Open Energy Info (EERE)

    modified from its original state, some details may not fully reflect the modified file. Image title Lucidchart Author None Short title 08-ID-c - Certificate of Public Convenience...

  11. DOI-BLM-ID-B010-2010-0083-CX | Open Energy Information

    Open Energy Info (EERE)

    0083-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-B010-2010-0083-CX CX for GeothermalExploration, CX for Thermal Gradient Holes for Geothermal...

  12. DOI-BLM-ID-I020-2012-0017-CX | Open Energy Information

    Open Energy Info (EERE)

    I020-2012-0017-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-I020-2012-0017-CX CX at Bingham-Caribou Geothermal Area for GeothermalExploration CX for...

  13. DOI-BLM-ID-B010-2010-??-CX | Open Energy Information

    Open Energy Info (EERE)

    ??-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-B010-2010-??-CX CX at Weiser Geothermal Area for GeothermalExploration CX at Weiser Geothermal Area for...

  14. DOI-BLM-ID-110-2009-3825-CE | Open Energy Information

    Open Energy Info (EERE)

    110-2009-3825-CE Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-110-2009-3825-CE CX at Crane Creek Geothermal Area for GeothermalExploration Crane Creek...

  15. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 6)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nelson, Johanna

    2011-07-22

    This is the third of five exposures of the same sample at different tilts. This one is at +30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  16. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 5)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nelson, Johanna

    2011-07-22

    This is the second of five exposures of the same sample at different tilts. This one is at +15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  17. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 8)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nelson, Johanna

    2011-07-22

    This is the fifth of five exposures of the same sample at different tilts. This one is at -30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  18. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 4)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nelson, Johanna

    2011-07-22

    This is the first of five exposures of the same sample at different tilts. This one is at +0 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  19. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 7)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nelson, Johanna

    2011-07-22

    This is the fourth of five exposures of the same sample at different tilts. This one is at -15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  20. How the DOE Data ID Service Works | OSTI, US Dept of Energy, Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientific and Technical Information the DOE Data ID Service Works DataCite | Contact DOE Data ID Service A DOE researcher, organization, or grantee determines that important datasets exist which need to be announced in DOE's scientific and technical databases and assigned DOIs. DOE Order 241.1B instructs that bibliographic information for these datasets be submitted to OSTI. First time submitters may contact OSTI at 865-576-6784 for help in deciding what submittal method will be used,

  1. Microsoft Word - DOE-ID-INL-11-006.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: INL - USGS Geotechnical Drilling Program (USGS 131A) SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to use an existing well pad to construct a replacement well, USGS131A, about 25 ft north of the original well head (USGS 131). USGS 131A will be drilled to about 1,300 ft below surface level (BSL) then instrumented with a multilevel monitoring system in FY 2012. The new well will replace USGS 131, which will be abandoned or used as a water

  2. Microsoft Word - DOE-ID-INL-12-014.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: M-10 Emergency Pump Backup Power SECTION B. Project Description: The proposed action would add a manually controlled electric power transfer switch and power inlet receptacle to the M-10 emergency coolant pump electrical power feed to power the M-10 pump to address safety issues that could arise with a complete loss of power on the Advanced Test Reactor (ATR)-670-E-15 diesel/commercial bus. The transfer switch and receptacle would be located outside the west wall of

  3. Microsoft Word - DOE-ID-INL-13-011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office SECTION B. Project Description: Install a 9000 BTU/hr split air conditioner in the SPO office of the FMF annex. 208V single phase power will be supplied from a new 20A breaker in the existing lighting panel (LP)-029. A new fusible disconnect switch will be installed on the outside of the building. Conduit will be field routed to

  4. Microsoft Word - DOE-ID-INL-13-023.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Test Reactor Area (TRA)-680 Road Widening SECTION B. Project Description: The purpose and need for the proposed action is to widen the gravel interior perimeter road within the Advanced Test Reactor (ATR) Complex at a location near TRA-680 to provide room for vehicles to pass (see Figure 1). The proposed action would widen the road near TRA-680 by placing fill material in an area approximately 16 ft. by 40 ft. Fill material would be obtained from the Monroe Gravel Pit

  5. Microsoft Word - DOE-ID-INL-14-011.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Shelley-New Sweden Parking Lot Flood Control SECTION B. Project Description: The Department of Energy-owned Shelley-New Sweden parking lot is currently unable to handle the storm water/snow melt runoff in the spring. The culvert to the north of the parking lot drains storm water/snow melt from the adjacent field under the highway and flows to the parking lot. In the spring, the parking lot pools up with storm water/snow melt causing portions of the lot to be unusable.

  6. Microsoft Word - DOE-ID-INL-14-050.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: 2A, 2B, 2D, and 1D Pressurizer Seismic Upgrades SECTION B. Project Description The loop pressurizers in cubicles 2A, 2B, 2D, and 1D located in Test Reactor Area (TRA)-670 have been found to be inadequate to meet the desired seismic requirements. In order to seismically qualify these pressurizers to meet current seismic criteria a modification will be needed. This modification may require the removal of asbestos insulation in order to access the pressurizer support

  7. Microsoft Word - DOE-ID-INL-15-012.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Replacement of Control Panel 670-E-80 (Outer Shim and Safety Rod Drive Motor Control Centers) SECTION B. Project Description: The 670-E-80 Motor Control Center (MCC) in the Advanced Test Reactor (ATR [Test Reactor Area (TRA)-670]) was installed in 1962 and provides power to the eight outer shim drive motors, the six safety rod drive motors, and the 24 neck shim drives, and it also houses two fission chamber drives. This MCC provides insert and withdraw control

  8. Microsoft Word - DOE-ID-INL-15-018.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Replacement of Man Hole Covers Test Reactor Area (TRA)-Confined Space (CS)-051 and TRA-CS-091 SECTION B. Project Description: Entrances for confined spaces TRA-CS-051 and TRA-CS-091 are enclosed with flat metal covers which tend to freeze during the winter. The valves in these confined spaces are required to be checked daily, and removing the cover when frozen presents a safety hazard. The proposed work scope is to replace the covers with new type E roof hatch covers.

  9. Microsoft Word - DOE-ID-INL-15-025.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Removal of Out of Service (OOS) Equipment and Installation of high-efficiency particulate air (HEPA) Filter in Test Reactor Area (TRA)-670 Pump Test Room SECTION B. Project Description: The room commonly called the Pump Test Loop is located in TRA-670 on the south side of the First Basement and just west of the Dry Transfer Cubicle (DTC). The room's lower level contains out of service (OOS) equipment that supported testing of Advanced Test Reactor (ATR) Loop pumps.

  10. Microsoft Word - DOE-ID-INL-15-026.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Advanced Test Reactor (ATR) Crane 670-C-7 Rated Capacity Upgrade SECTION B. Project Description: A leak was previously identified in the resin discharge nozzle at the bottom of the existing 670-M-17 Bypass Demineralizer cation tank. To repair it, it was determined that all four vessels (670-M-16, 670-M-17, 670-M-18, and 670-M-19) needed to be replaced. Each vessel is located in its own concrete vault and connected to system piping within each vault with flanged spool

  11. Microsoft Word - DOE-ID-INL-15-029.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Advanced Test Reactor 2A Loop Chemistry Control SECTION B. Project Description: Research and Development (R&D) experiments associated with the National Scientific User Facility (NSUF) at Advanced Test Reactor (ATR) require a primary loop chemistry similar to that found in the commercial nuclear power industry pressurized water reactor (PWR). The initial chemistry control parameters selected by the NSUF program required a loop pH of approximately 5.6 to 8.6 with no

  12. Microsoft Word - DOE-ID-INL-15-037.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Test Reactor Area (TRA)-715 Evaporation Pond Liner Replacement SECTION B. Project Description: The hypalon liner for the TRA-715 Evaporation Pond has reached the end of its service life and a new liner is needed. The installation would be started in calendar year 2015 and completed in 2016. In order to install the new liner, the west side of the pond would be drained first. To drain the pond, a temporary system would be used to pump water through perforated pipe along

  13. Microsoft Word - DOE-ID-INL-15-049.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: RB-21 and RB-22 Evacuation Siren Relocation SECTION B. Project Description and Purpose: The proposed action would relocate evacuation sirens RB-21 and RB-22. The power to siren RB-21 is being fed through building Test Reactor Area (TRA)-673 which is being prepared for decommissioning and demolition. Siren RB-21 would be relocated from a wooden pole north of TRA-673 to a new wooden pole to be installed just north of TRA-625. Siren RB-22 is fed from an overhead power

  14. Microsoft Word - DOE-ID-INL-15-059.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Installation of Lock-out/Tag-out (LO/TO) Equipment Storage Cabinets in Test Reactor Area (TRA)-670 SECTION B. Project Description and Purpose: The proposed action would install new metal storage cabinets in building TRA-670 in the laydown area and switchgear room. The new cabinets would be used to store lock-out/tag-out (LO/TO) equipment and personal protective equipment (PPE) to reduce degradation of electrical PPE. Cabinets in the laydown area include one PPE

  15. Microsoft Word - DOE-ID-INL-15-071.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Idaho Falls (IF)-675 Majestic Park Portable Isotopic Neutron Spectroscopy (PINS) Laboratory (MPPL) Environmental Chamber Installation SECTION B. Project Description and Purpose: The proposed action would install and test a Cincinnati Sub-Zero (CSZ) Model ZPH-8-2-H/AC Temperature/Humidity Test Chamber at the IF-675 Majestic Park PINS Laboratory (MPPL) located at 2752 E. 14th N. Idaho Falls, Idaho. The chamber unit is approximately 3 ft X 5 ft X 6 ft high. The CSZ Model

  16. Microsoft Word - DOE-ID-INL-15-076.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner SECTION B. Project Description and Purpose: The refrigerant side of the Advanced Test Reactor (ATR) Process Control Room (PCR) air conditioner, 670-HVA-3, has stopped functioning. After several failed attempts to repair, the 7.5 ton self-contained unit will be replaced with a similar 10 ton self-contained unit. The new unit will provide cooling to the PCR as before, but will require changes to the

  17. Microsoft Word - DOE-ID-INL-15-077.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Dispose of Old Materials and Fuels Complex (MFC) Security Trailer SECTION B. Project Description and Purpose: The old MFC security trailer is a wood-framed, mobile office trailer with a metal chassis. The trailer has not been occupied for at least five years and needs to be disposed. The trailer is approximately 11 feet by 32 feet. It was located by the gun range outside of the MFC perimeter fence. The trailer does not contain operating sanitary facilities or a

  18. Microsoft Word - DOE-ID-INL-16-005.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: National and Homeland Security (N&HS) Portable Restroom Trailer Purchase and Use SECTION B. Project Description and Purpose: N&HS will acquire a portable restroom trailer for use at various locations throughout the Idaho National Laboratory (INL). The trailer will serve as a comfort station for use by men and women in remote areas during N&HS testing events and other activities. The trailer is a double axel - 22-foot long - 12,000 lbs unit. The trailer

  19. Microsoft Word - DOE-ID-INL-16-016.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Hot Fuel Examination Facility (HFEF) High Bay Crane Refurbishment SECTION B. Project Description and Purpose: The 40-ton crane located in the highbay of the Hot Fuels Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) building MFC-785 has reached the end of its useful life. Replacement of the crane is needed to continue facility operations and for placement and removal of items in and out of the hot cell. The proposed action would remove and replace

  20. Microsoft Word - DOE-ID-INL-16-017.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: B27-601 and B8-601 Emergency Generator Replacement SECTION B. Project Description and Purpose: The emergency generators located in buildings B27-601 (near Guard Gate #1) and B8-601 (near Guard Gate #4) are no longer operating and need to be replaced. Both generators are O'Brien model OB 30K-DW61 generators with 61 horsepower Cummins model 4B-3.9 diesel engines. The generator in building B27-601 has not operated since the 2007 timeframe, and the B8-601 generator was

  1. Project List Report in Excel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LDRD Project List -- FY 2014 Project ID Project Name FY Total AMES - Ames Laboratory FY2013-AKI-0513 Demistifying the hydration layer on nano oxide in suspensions by liquid cell TEM $112,391 FY2013-GOR-1218 Dynamic Whitelist Generation for Automated Intrusion Response $228,075 FY2013-HUA-0413 Atomic and electronic level control of nanocluster catalysts encapsulated in MOFs $103,711 FY2013-JON-0114 Rapid, Small-Scale, High-Purity Rare Earth Metal preparation $43,205 FY2013-WAN-0113

  2. Microsoft Word - DOE-ID-INL-12-004.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Descriptive Information: Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change SECTION B. Project Description: MFC-794 CESB is currently being modified for reasons described in Environmental Checklist (EC) Idaho National Laboratory (INL)-10- 074 (OA 12). During construction it was determined that some of the equipment that will be located in the building will need non-contact cooling water in order to operate. This EC addresses the

  3. Microsoft Word - DOE-ID-INL-12-026.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 DIRECTIONS: Responsible Managers, Program Environmental Lead (PEL), and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (see Environmental Points of Contact, NEPA/Environmental Checklist Support at http://webfiles/es&h/es&s/contacts.pdf). Enter a Valid Charge Number: 101653B80 SECTION A. Project Title: Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor

  4. AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2

    National Nuclear Security Administration (NNSA)

    CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2 PAGES MI10 I See Block 16C I REQ. NO. BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 2. AMENDMENTIMODIFICATION NO. 1 3. EFFECTIVE DATE 1 4. REQUISITIONIPURCHASE 1 5. PROJECT NO. (If a ~ ~ l i c a b l e l . a , U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 96. DATED (SEE ITEM 1 1 ) 6. ISSUED BY CODE 1 7.

  5. West Valley Demonstration Project Administrative Consent Order, August 27, 1996

    Office of Environmental Management (EM)

    Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________|

  6. A Better Way to ID Extreme Weather Events in Climate Models

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Better Way to ID Extreme Weather Events in Climate Models A Better Way to ID Extreme Weather Events in Climate Models Berkeley Lab scientists help automate the search for hurricanes and other storms in huge datasets December 7, 2011 Dan Krotz, dakrotz@lbl.gov, +1 510-486-4019 You'd think that spotting a category 5 hurricane would never be difficult. But when the hurricane is in a global climate model that spans several decades, it becomes a fleeting wisp among mountains of data. That's a

  7. Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy

    Energy Savers [EERE]

    on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent

  8. How to Use the DOE Data ID Service: For Data Centers and High Volume/High

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Frequency Submitters | OSTI, US Dept of Energy, Office of Scientific and Technical Information Data Centers and High Volume/High Frequency Submitters DataCite | Contact DOE Data ID Service Call or email your organization's Scientific and Technical Information (STI) Manager. Your STI Manager will refer you to the correct contact at OSTI. Or, if someone else has suggested you contact OSTI directly, you may do so through the DOE Data ID Service email. OSTI will work with you to discover your

  9. DOE Data ID Service Benefits | OSTI, US Dept of Energy, Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientific and Technical Information Benefits DataCite | Contact DOE Data ID Service When you submit metadata to OSTI about a dataset, you are basically "announcing" that it exists and you are describing it. That's why you will see the name of the basic submittal tool for data referred to as "Announcement Notice 241.6." Note that the DOE Data ID Service does not accept the dataset itself; only the metadata is submitted. The metadata loads into the OSTI processing system

  10. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 2)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Seibert, M. Marvin; Ekeberg, Tomas

    2011-02-02

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 2 are the pattern and configuration files for the pattern showed in Figure 2b in the paper.

  11. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 1)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Seibert, M. Marvin; Ekeberg, Tomas; Maia, Filipe R.N.C.

    2011-02-02

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 1 are the pattern and configuration files for the pattern showed in Figure 2a in the paper.

  12. Last Revision Date: 8/16/2010 Last Merged Filing ID:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision Date: 8/16/2010 Last Merged Filing ID: Tariffs, Rate Schedules, and Other Tariff Documents Southwestern Power Administration Tariffs, Rate Schedules, and Other Tariff Documents Document Generated On: 10/1/2010 Contents TABLE OF CONTENTS ....................................................................................................................................1 PREAMBLE: AUTHORITIES AND OBLIGATIONS

  13. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 1)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Seibert, M. Marvin; Ekeberg, Tomas; Maia, Filipe R.N.C.

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 1 are the pattern and configuration files for the pattern showed in Figure 2a in the paper.

  14. Voltage Fade, an ABR Deep Dive Project: Status and Outcomes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Voltage Fade, an ABR Deep Dive Project: Status and Outcomes Project ID: ES161 Anthony Burrell Voltage Fade Team Annual Merit Review Washington DC, June 16-20, 2014 This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 Overview Timeline * Start: October 1, 2012 * End: Sept. 30, 2014 * Percent complete: 75% Budget * Voltage Fade project * $3,900K Barriers * Calendar/cycle life of lithium-ion cells being developed for PHEV and EV batteries that

  15. DOE Extends Advanced Mixed Waste Treatment Project Contract | Department of

    Office of Environmental Management (EM)

    Energy Advanced Mixed Waste Treatment Project Contract DOE Extends Advanced Mixed Waste Treatment Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Advanced Mixed Waste Treatment Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, Idaho Treatment Group

  16. Kenya-GEF Projects | Open Energy Information

    Open Energy Info (EERE)

    database1 GEF Climate Projects in Kenya 1780 Kenya Joint Geophysical Imaging (JGI) Methodology for Geothermal Reservoir Assessment Climate Change UNEP Medium Size Project, GEF...

  17. Edison Job Size Charts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Job Size Charts Edison Job Size Charts Fraction of Hours Used per Job Size This chart shows the fraction of hours used on Edison in each of 5 job-core-size bins. 2015 Usage by Job Size Chart 2014 Fraction of Hours Used by Big Jobs This chart shows the fraction of hours used on Edison by jobs using 16,384 or more cores. 2015 Usage by Job Size Chart 2014 Last edited: 2015-02-18 16:06:26

  18. DOE Data ID Service Background | OSTI, US Dept of Energy, Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientific and Technical Information Background DataCite | Contact DOE Data ID Service In 2011, the DOE Office of Scientific and Technical Information (OSTI) joined DataCite to facilitate citing, accessing, and reusing publicly available scientific research datasets produced by DOE-funded researchers. DataCite is an international organization that supports data visibility, ease of data citation in scholarly publications, data preservation and future re-use, and data access and

  19. Meeting Summary Docket ID No. EERE-2014-BT-STD-0036-0023

    Office of Environmental Management (EM)

    Meeting Summary Docket ID No. EERE-2014-BT-STD-0036-0023 RIN 1904-AD35 Tuesday, December 22, 2015 On December 15, 2015, representatives of the Hearth Patio & Barbecue Association (HPBA) met with Department of Energy (DOE) officials to discuss issues related to DOE's proposed energy conservation standard for "hearth products" published at 80 Fed. Reg. 7082 (February 9, 2015). The meeting was attended by the following individuals: Jack Goldman, President & CEO of HPBA Ryan

  20. Microsoft PowerPoint - ID 876 TourBooklet_revb_Geology [Compatibility Mode]

    Office of Environmental Management (EM)

    Energy, National Nuclear Security Administration Nevada Field Office Bob Andrews Navarro-Intera December 10, 2014 Nevada National Security Site Underground Test Area (UGTA) Tour Page 2 Page 2Title ID 876 Tour Booklet 12/10/2014 - Page 2 Log No. 2014-xxx Nevada National Security Site (NNSS) * NNSS has many diverse roles to support the U.S. nuclear weapons stockpile stewardship missions and also supports other U.S. Department of Energy (DOE), Department of Defense, and Department of Homeland

  1. Microsoft Word - DOE-ID-12-009 Colorado School of Mines.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 SECTION A. Project Title: Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line SECTION B. Project Description The Colorado School Mines project has three...

  2. Classroom Projects - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford For Students and Kids Classroom Projects Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Classroom Projects Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size If you've been assigned to write a report or complete a classroom assignment that involves Hanford, we've got some tools that might help you with your project! Photographs The first is an online photo gallery of pictures. We've got thousands of photographs

  3. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOEs Idaho site.

  4. Hopper Job Size Charts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Job Size Charts Hopper Job Size Charts Fractional Jobs The following charts show the fraction of hours used on Hopper in each of five job-core-size bins: 2014 Usage by Job Size Chart 2013 2012 2011 Large Jobs The following charts show the fraction of hours used on Hopper by jobs using greater than 16,384 cores: 2014 2013 2012 Usage by Job Size Chart 2011 Last edited: 2014-12-22 12:16:26

  5. Active DOE Techncial Standards Projects

    Energy Savers [EERE]

    RegistraƟon Number Assignments (AcƟve) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Status Date P-2015-03 DOE System Analyst And EvaluaƟon Of The Intrusion DetecƟon And Assessment System Technical Standard Samuel Callahan (AU-51) Mister T. McDonnell (301) 903-0889 mister.mcdonnell@hq.doe.gov IniƟated - In Development 02/17/2015 P1020- Natural Phenomena Hazards Analysis and P1020-2012REV James O'Brien Sharon Jasim-Hanif IniƟated - In Development 2012REV Design

  6. Project List Report in Excel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ID Project Name FY Total P/ANL2010-003 Magneto-Vibrational Energy Conversion at the Nanoscale $134,100 P/ANL2010-010 Laser Manipulation of Nuclear Spin Embedded in Nobel-Gas Ice $148,700 P/ANL2010-029 Single Quantum Flux Mangnetometer $151,400 P/ANL2010-042 Emerging Technologies for Scientific Databases $149,100 P/ANL2010-043 Low Mass Optical Read-out for High Data Bandwidth Systems $176,500 P/ANL2010-044 Novel Power System Operations Methods for Wind-powered Plug-in Hybrid Electric Vehicles

  7. Summary - Preliminary TRA of the Calcine Disposition Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRA R Un Calcine The Id materi Dec. 2 Press additiv form w those project anticip 2012 a CD-1 a selecte Level ( assess Eleme assign prepar The as below achiev * R * Ba * C The Ele Site: I roject: C Report Date: ited States Prelim Why DOE e HIP Treatment daho high-level al designated t 2009) to underg (HIP) process. ves, converts th with durability a of borosilicate t is currently in pates Critical D authorizing the approval, it is t ed technology (TRL) of 4 or h sment was to id ents (CTEs) of t n

  8. AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I CONTRACT ID CODE PAGE OF PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I CONTRACT ID CODE PAGE OF PAGES 1 14 2. AMENDMENT/MODIFICATION NO. 3 EFFECTIVE DATE 4. REQUISITION/PURCHASE RED. NO 5. PRtOJECT NO. (if pplicable) 186 See Block 16CL 6. ISSUED BY CODE j 0603 7. ADMINISTERED BY (If other than Item 6) CODE 00603 office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy office of River Protection office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 MS: H6-60 Richland WA 99352 6. NAME AND ADDRESS OF

  9. Here�s What�s Going on with DOE-ID

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Here�s What�s Going on with DOE-ID As you know, we initiated a survey under �Voice of the People� last month, in order to get your input on how we can make this website more useful to you. In response to your feedback, one thing we did is develop a monthly article that attempts to capsulize the activities and opportunities for public input, all in one place. This is the first of those articles. Public Involvement Opportunities You have until close of business on June 21 to provide input

  10. How to Use the DOE Data ID Service: For Individual Lab Researchers | OSTI,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    US Dept of Energy, Office of Scientific and Technical Information Individual Lab Researchers DataCite | Contact DOE Data ID Service Call or email your organization's Scientific and Technical Information (STI) Manager. Explain your need to submit a dataset to support a publication and/or to receive a DOI. Ask if your lab has been assigned a unique DOI prefix. The answer should be "yes." If it is not, the STI Manager will need to contact OSTI to obtain a prefix and then get back to

  11. Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B:

    Gasoline and Diesel Fuel Update (EIA)

    Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B: Zip Code - Secure File Transfer option available at: - - - - Email form to: OOG.SURVEYS@eia.doe.gov Fax form to: (202) 586-9772 Email address: Oil & Gas Survey U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 1. Total Acquisitions (Enter the total volume of foreign crude oil acquired during the report month for importation into the United States.

  12. Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite)

    Gasoline and Diesel Fuel Update (EIA)

    Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite) Secure File Transfer option available at: (e.g., PO Box, RR) Electronic Transmission: The PC Electronic Data Reporting Option (PEDRO) is available. Zip Code: - If interested in software, call (202) 586-9659. Email form to: Fax form to: (202) 586-9772 - - Mail form to: Oil & Gas Survey - - U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free:

  13. AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2

    National Nuclear Security Administration (NNSA)

    ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property

  14. AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ( I. ID CODE

    National Nuclear Security Administration (NNSA)

    ( I. ID CODE / DE-ACO4-OOAL6662O ' 10s. DATED (SEE ITEM 13) PAGE I OF 2 PAGES Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this

  15. AMENDMENT OF SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE

    National Nuclear Security Administration (NNSA)

    SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) DE-AC04-00AL66620 I I IOB. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. MI41 9A. AMENDMENT OF Sol-ICITATION NO. CODE I ~ H L I L I I Y L U U ~ I I - 11. THlS ITEM ONLY APPLIES TO AMENDMENTS OF

  16. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  17. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and...

  18. An interactive version of PropID for the aerodynamic design of horizontal axis wind turbines

    SciTech Connect (OSTI)

    Ninham, C.P.; Selig, M.S.

    1997-12-31

    The original PROP code developed by AeroVironment, Inc. and its various versions have been in use for wind turbine performance predictions for over ten years. Due to its simplicity, rapid execution times and relatively accurate predictions, it has become an industry standard in the US. The Europeans have similar blade-element/momentum methods in use for design. Over the years, PROP has continued to be improved (in its accuracy and capability), e.g., PROPSH, PROPPC, PROP93, and PropID. The latter version incorporates a unique inverse design capability that allows the user to specify the desired aerodynamic characteristics from which the corresponding blade geometry is determined. Through this approach, tedious efforts related to manually adjusting the chord, twist, pitch and rpm to achieve desired aerodynamic/performance characteristics can be avoided, thereby making it possible to perform more extensive trade studies in an effort to optimize performance. Past versions of PropID did not have supporting graphics software. The more current version to be discussed includes a Matlab-based graphical user interface (GUI) and additional features that will be discussed in this paper.

  19. Microsoft Word - DOE-ID-14-072 Pittsburgh EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: - High Spatial Resolution Distributed Fiber-Optic Sensor Network for Reactors and Fuel Cycle Systems - University of Pittsburgh SECTION B. Project...

  20. Microsoft Word - DOE-ID-15-027 Maryland EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Enhancement of the Extraction of Uranium from Seawater - University of Maryland SECTION B. Project Description The University of Maryland proposes to...

  1. Microsoft Word - DOE-ID-13-052 Chicago EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Development of Novel Porous Sorbents for Extraction of Uranium from Seawater - The University of Chicago SECTION B. Project Description The University...

  2. Microsoft Word - DOE-ID-12-025 Ohio State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Enhancement of Radiation Safety and Radiological Monitoring Systems for the Ohio State University Nuclear Reactor SECTION B. Project Description The...

  3. Microsoft Word - DOE-ID-14-089 Westinghouse EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Development of Thermo-Acoustic Sensors for Sodium-cooled Fast Reactors - Westinghouse Electric Company LLC SECTION B. Project Description Westinghouse ...

  4. Microsoft Word - DOE-ID-11-011 Michigan EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Acquisition of a 3 MV Tandem Accelerator for Research and Teaching in Nuclear Science and Engineering - University of Michigan SECTION B. Project...

  5. Ongoing Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated March 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Current Projects Print Text Size:

  6. LTS Project Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management About Us LTS Home Page LTS Project Management LTS Transition and Timeline LTS Execution LTS Background LTS Information Management LTS Fact Sheets / Briefings LTS In The News LTS Related Links LTS Contact Us LTS Project Management Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size DOE-RL Office of Assistant Manager for Mission Support (AMMS) is responsible for LTS Program Management. The Site Stewardship Division is responsible for LTS under AMMS

  7. Active DOE Technical Projects

    Office of Environmental Management (EM)

    ID SLM ORG Author Phone Email Status Status Date P1107- 1997REV Knowledge, ... on of Documented Safety Analysis for Decommissioning and Environmental Restora on Ac vi es ...

  8. North Portal Fuel Storage System Fire Hazard Analysis-ESF Surface Design Package ID

    SciTech Connect (OSTI)

    N.M. Ruonavaara

    1995-01-18

    The purpose of the fire hazard analysis is to comprehensively assess the risk from fire within the individual fire areas. This document will only assess the fire hazard analysis within the Exploratory Studies Facility (ESF) Design Package ID, which includes the fuel storage system area of the North Portal facility, and evaluate whether the following objectives are met: 1.1.1--This analysis, performed in accordance with the requirements of this document, will satisfy the requirements for a fire hazard analysis in accordance with U.S. Department of Energy (DOE) Order 5480.7A. 1.1.2--Ensure that property damage from fire and related perils does not exceed an acceptable level. 1.1.3--Provide input to the ESF Basis For Design (BFD) Document. 1.1.4 Provide input to the facility Safety Analysis Report (SAR) (Paragraph 3.8).

  9. Does size matter?

    SciTech Connect (OSTI)

    Carreras, B. A.; Physics Department, College of Natural Science and Mathematics and Geophysical Institute, University of Alaska, Fairbanks, Alaska 99775; Physics Department, Universidad Carlos III de Madrid, Madrid ; Newman, D. E.; Dobson, Ian

    2014-06-15

    Failures of the complex infrastructures society depends on having enormous human and economic cost that poses the question: Are there ways to optimize these systems to reduce the risks of failure? A dynamic model of one such system, the power transmission grid, is used to investigate the risk from failure as a function of the system size. It is found that there appears to be optimal sizes for such networks where the risk of failure is balanced by the benefit given by the size.

  10. Microsoft Word - DOE-ID-11-014 Missouri ST EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Upgrade of Missouri S&T Reactor for Distance Learning - Missouri University of Science and Technology SECTION B. Project Description Missouri S&T will...

  11. Microsoft Word - DOE-ID-13-001 General Atomics EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Development of ASTM Standard for SiC-SiC Joint Testing - General Atomics SECTION B. Project Description General Atomics (GA) proposes to develop an...

  12. Microsoft Word - DOE-ID-12-041 INL EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Monitoring and Control of the Hybrid Laser-Gas Metal Arc Welding Process - Idaho National Laboratory SECTION B. Project Description This project will investigate a promising welding process that combines gas metal-arc welding and laser beam welding into Hybrid Las - Gas Metal-Arc Welding. The objectives of this project are to:  Develop and demonstrate a prototype system base on a number of sensing and diagnostic tools to monitor and provide real- time weld process

  13. Microsoft Word - DOE-ID-14-088 General Atomics EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Modularization Fabrication and Characterization of Complex Silicon Carbide Composite Structures - General Atomics SECTION B. Project Description General Atomics will The proposed project will explore innovative methods for fabricating and testing complex Silicon carbide (SiC) and SiC fiber-reinforced composite structures pertinent to advanced reactor concepts. The project will use existing facilities to conduct the research. SECTION C. Environmental Aspects /

  14. Microsoft Word - DOE-ID-INL-13-002 _INL-13-008_.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Advanced Test Reactor (ATR) Near Term Remote Monitoring and Management Project SECTION B. Project Description: This project provides for the capability to monitor reactor conditions and to take mitigative actions from two locations outside of the ATR confinement if the reactor control room must be evacuated. The two selected locations are the Process Control Room (PCR) in room 121 of the ATR building Test Reactor Area (TRA)-670 and in rooms 114/115 of the Emergency

  15. Microsoft Word - DOE-ID-INL-13-004 R1.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04 R1 SECTION A. Project Description: High Density Fuel Material for Light Water Reactors (LWRs) SECTION B. Project Description: This project proposes to install glove boxes, laboratory equipment and laboratory hoods in the east wing of the Experimental Fuels Facility (EFF), building 794, at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The building was previously known as the Contaminated Equipment Storage Building (CESB). The purpose of this project is to

  16. Microsoft Word - DOE-ID-12-027 Oregon State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Building calorimetric and thermogravimetric analytical instrumentation capability at Oregon State University SECTION B. Project Description The objective of this project is to further the radiochemistry and nuclear material research at Oregon State University by building a calorimetric and thermogravimetric capability in the Laboratory of Transuranic Elements. This will be accomplished by acquiring a nano isothermal titration calorimeter and thermogravimetric

  17. A 12-MW-scale pilot study of in-duct scrubbing (IDS) using a rotary atomizer

    SciTech Connect (OSTI)

    Samuel, E.A.; Murphy, K.R.; Demian, A.

    1989-11-01

    A low-cost, moderate-removal efficiency, flue gas desulfurization (FGD) technology was selected by the US Department of Energy for pilot demonstration in its Acid Rain Precursor Control Technology Initiative. The process, identified as In-Duct Scrubbing (IDS), applies rotary atomizer techniques developed for lime-based spray dryer FGD while utilizing existing flue gas ductwork and particulate collectors. IDS technology is anticipated to result in a dry desulfurization process with a moderate removal efficiency (50% or greater) for high-sulfur coal-fired boilers. The critical elements for successful application are: (1) adequate mixing of sorbent droplets with flue gas for efficient reaction contact, (2) sufficient residence time to produce a non-wetting product, and (3) appropriate ductwork cross-sectional area to prevent deposition of wet reaction products before particle drying is comple. The ductwork in many older plants, previously modified to meet 1970 Clean Air Act requirements for particulate control, usually meet these criteria. A 12 MW-scale IDS pilot plant was constructed at the Muskingum River Plant of the American Electric Power System. The pilot plant, which operates from a slipstrem attached to the air-preheater outlet duct from the Unit 5 boiler at the Muskingum River Plant (which burns about 4% sulfur coal), is equipped with three atomizer stations to test the IDS concept in vertical and horizontal configurations. In addition, the pilot plant is equipped to test the effect of injecting IDS off- product upstream of the atomizer, on SO{sub 2}and NO{sub x} removals.

  18. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015. Today's contract

  19. Mission Need Statement: Idaho Spent Fuel Facility Project

    SciTech Connect (OSTI)

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  20. Identifying Renewable Energy Projects for Federal Agencies |...

    Broader source: Energy.gov (indexed) [DOE]

    projects that can help federal agencies meet their 30% renewable electricity by 2025 target. This research is summarized on this page. Renewable Energy Markets The size of the...

  1. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 1 Smart Grid Demonstration Project Locations NH MA 16 Awards Support Projects in 21 States

  2. Microsoft Word - DOE-ID-11-003 Tennessee EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Multipurpose Target Chamber for High-Temperature Ion Irradiation - University of Tennessee SECTION B. Project Description This project will build and install a multipurpose target chamber to conduct high-temperature testing of materials under ion-beam irradiation or ion implantation. Such irradiations do not generate any radiation. The target chamber will be operated under high vacuum. Once constructed, it will be connected to one of three beam lines at the ion

  3. Microsoft Word - DOE-ID-11-004 Illinois EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign SECTION B. Project Description The scope of the project includes purchasing equipment that the University of Illinois will use to construct a high pressure materials analysis facility. The facility will provide a compact and efficient mechanism for studying creep-fatigue-rupture in nuclear fuels (cladding) and structural materials under extreme environment

  4. Microsoft Word - DOE-ID-11-007 Colorado Mines EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Imaging Upgrades for the Colorado School of Mines Nuclear Science and Engineering Program - Colorado School of Mines SECTION B. Project Description This project has three objectives: 1. Upgrade the Transmission Electron Microscope in the Active Materials Characterization Laboratory (ActMCL) with a digital imaging system 2. Upgrade the ActMCL and Nuclear Fuel Development Lab (NFDL) with modern radiation detection and measurement equipment, for both research and

  5. Microsoft Word - DOE-ID-11-009 Utah EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Development of Nuclear Energy-Related Infrastructure and Capabilities at the Utah Nuclear Engineering Radiation Measurement Laboratory - University of Utah SECTION B. Project Description This project will upgrade the nuclear engineering measurement lab of the Nuclear Engineering Measurement Laboratory at the Utah Nuclear Engineering Program, University of Utah by purchasing two high energy resolution HPGe detector counting systems, a scintillation detector counting

  6. Microsoft Word - DOE-ID-11-010 Wisconsin - Agasie EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: NEUP Infrastructure Program: Minor Reactor Upgrades- University of Wisconsin SECTION B. Project Description This project by the University of Wisconsin will: -Upgrade the reactor pool water system with a reverse osmosis system and a capacitance continuous level measurement probe with an associated digital meter display -Upgrade the reactor instrumentation and control systems with a multi-turn rotary absolute encoder along with associated digital readout devise and

  7. Microsoft Word - DOE-ID-11-020 Ohio State - Blue EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20 SECTION A. Project Title: A NEUP Minor Reactor Upgrade Request for Enhancement of Safety and Operational Monitoring Systems and Research Capabilities of the Ohio State University Nuclear Reactor Laboratory SECTION B. Project Description The object of this project by the University of Wisconsin is to upgrade outdated systems critical to operation of the reactor and laboratory to ensure their long-term viability for serving the education and research missions of both OSU and DOE. Equipment and

  8. Microsoft Word - DOE-ID-11-022 Ohio State - Cao EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: An Integrated Upgrade of Scientific Equipment for Strengthening the Research and Education in Nuclear Energy at the Ohio State University SECTION B. Project Description The overall goal of this project is to acquire equipment/instrumentation that will be integrated into the existing infrastructure at the Nuclear Engineering program at the Ohio State University to help improve capabilities in research and education. To accomplish this, the following equipment will be

  9. Microsoft Word - DOE-ID-12-001 Rensselaer EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering - Rensselaer Polytechnic Institute SECTION B. Project Description The scope of the project includes purchasing a new Spark Plasma Sintering (SPS) system. The new equipment will be primarily used to advance the cutting edge research in the innovative materials design including fuel, structural, and waste form materials. SECTION C. Environmental Aspects / Potential Sources of

  10. Microsoft Word - DOE-ID-12-006 Utah EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Acquisition of Specific Equipment to Enhance Performance, Control and Operational Capability of the University of Utah TRIGA Facilities SECTION B. Project Description The objective of this project is to replace the University of Utah TRIGA Reactor heavy water-element handling tool and underwater vacuum cleaner, and to add a portable spectroscopy system and broad energy germanium detector to the facility operational capabilities. SECTION C. Environmental Aspects /

  11. Microsoft Word - DOE-ID-12-007 NC State EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: A High Resolution Digital System in Support of Neutron Imaging at the PULSTAR Reactor - North Carolina State University SECTION B. Project Description The objective of this project is to establish t he capability of high resolution digital neutron imaging at the North Carolina State University (NCSU) PULSTAR reactor. It will be integrated into the existing neutron imaging facility at PULSTAR, and it will be supported by the user facility structure of the Nuclear

  12. Microsoft Word - DOE-ID-12-008 Missouri EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Nuclear Instrumentation Upgrade for MURR Reactor Power Level Monitoring - University of Missouri SECTION B. Project Description The objective of this project is to replace the Nuclear Instrumentation (NI) and associated components of the University of Missouri Research Reactor (MURR). The NI system monitors and displays neutron flux from subcritical source multiplication range, through intermediate range to full power, while also providing reactor period information.

  13. Microsoft Word - DOE-ID-12-010 VCU EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 SECTION A. Project Title: Radiation Detection and Nuclear Materials Laboratory Equipment in Support of Student Training and Research by the Department of Mechanical and Nuclear Engineering at Virginia Commonwealth University SECTION B. Project Description This project will support the development of the educational and research infrastructure of the new nuclear engineering program at Virginia Commonwealth University by purchasing a HPGe detector, a gas proportional counter, and a Nal

  14. Microsoft Word - DOE-ID-12-014 Alcorn State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Developing the Currently Existing Nuclear Instrumentation and Radiation Research Laboratories at Alcorn State University SECTION B. Project Description The goal of this Alcorn State University project is to improve the existing basic level nuclear instrumentation laboratory and expand the radiation research laboratory with the ASU Health Physics department for research and training. This will be accomplished by purchasing radiation detectors. SECTION C. Environmental

  15. Microsoft Word - DOE-ID-12-020 Washington State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington State University SECTION B. Project Description The principle objective of this project is to add new instrumentation to an existing suite of dedicated equipment supporting research on radioactive materials. The research focuses primarily on the chemistry of lanthanide and actinide metal ions, which are of central importance in the development of future fuel cycles that will support actinide

  16. Microsoft Word - DOE-ID-12-022 Colorado State.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Revitalizing Health Physics Education for Nuclear Energy Careers - Colorado State University SECTION B. Project Description The objectives of this Colorado State University project are to update instrumentation to reflect current instruments utilized at nuclear power plants and national laboratories, utilize measurement equipment to perform research, and achieve ISO 17025 accreditation. This will be accomplished by purchasing a CZT-based portable detector, alpha

  17. Microsoft Word - DOE-ID-13-027 Utah EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Risk Assessment of Structural Integrity of Transportation Casks - University of Utah SECTION B. Project Description The University of Utah proposes to assess the risk of loss of structural integrity of transportation casks and fuel cladding after extended storage. The project will include subjecting canisters to impact loads and puncture tests. Casks will be subjected to accelerated degradation due to chloride attacks to simulate the effects of exposure to

  18. Microsoft Word - DOE-ID-13-036 New Mexico EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Improving the Understanding of the Coupled Thermal-Mechanical-Hydrologic Behavior of Consolidating Granular Salt - University of New Mexico SECTION B. Project Description The University of New Mexico proposes to improve the understanding of key aspects of the coupled thermal-mechanical-hydrologic response of granular salt used as a seal material for shafts, drifts, and boreholes in mined repositories in salt. Specific objectives of the project are: 1. Measure the

  19. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal of Contaminants - University of Idaho SECTION B. Project Description The University of Idaho proposes to evaluate nanostructured sorbent materials for their effectiveness in removing and immobilizing contaminants for the off-gas treatment from the used nuclear fuel recycling operations. Specific objectives of the project are: 1. To synthesize and characterize various nanosorbents for the

  20. Microsoft Word - DOE-ID-13-047 Arizona State EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SECTION A. Project Title: Radiation Hardened Electronics Destined for Severe Nuclear Reactor Environments - Arizona State University SECTION B. Project Description Arizona State University proposes to develop both board and application-specific integrated circuits (ASIC) level (radiation hardening by design) RHBD techniques for circuits destined for severe nuclear environments, specifically those that are vital to robotic circuits. The project will focus on using redundancy to achieve total

  1. Microsoft Word - DOE-ID-14-076 Penn State EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Novel Dissimilar Joints Between Alloy 800H and 2.25%Cr and 1%Mo Steel - The Pennsylvania State University SECTION B. Project Description The Pennsylvania State University proposes to undertake an integrated experimental and theoretical research program to develop, fabricate, and test highly engineered dissimilar metal weld joints between 2.25Cr-1 Mo ferritic steels and an 800-H nickel base alloys. The projects will also generate, evaluate, and document data on welding

  2. Microsoft Word - DOE-ID-15-082 ESER B1-20.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Sagebrush Seedling Planting - ESER SECTION B. Project Description The purpose and need for the project is to restore habitat for Greater sage-grouse as a conservation measure in the Candidate Conservation Agreement. We propose to plant 5000 seedlings of big sagebrush (Artemisia tridentate) on approximately 50 acres in the Sage Grouse Conservation Area on the INL Site. Specifically, the proposed planting site for 2014 will be in the area burned by the Tin Cup Fire west

  3. Microsoft Word - DOE-ID-INL-12-008 _INL-12-032_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SECTION A. Project Title: Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area SECTION B. Project Description: Provide a brief but thorough description of the project or action, including the type of action (for example, new activity or facility, construction, process or facility modification, maintenance, research and development, work for others), description of activities, work phases, location of work activity (include a map or diagram, if appropriate), purpose and need (what is

  4. Microsoft Word - DOE-ID-INL-12-009 _INL-12-028_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 SECTION A. Project Title: Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project SECTION B. Project Description: The Idaho National Laboratory (INL) closed circuit television (CCTV) provides video surveillance for use by protective forces in the protection of Department of Energy (DOE) security assets at the INL. The INL consists of a number of facilities spread out over an 890 square mile area and with facilities located in Idaho Falls. The CCTV system is

  5. Microsoft Word - DOE-ID-INL-13-009 R1.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 R1 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Project Sagebrush Atmospheric Tracer Dispersion Study Revision 1 SECTION B. Project Description: This revision of this EC is being prepared to provide estimated quantities of tracer emissions to account for greenhouse gas (GHG) emissions and to clarify that the National Oceanic and Atmospheric Administration (NOAA) would report GHG emissions as required by Executive Order (EO) 13514. The National Oceanic and

  6. Microsoft Word - DOE-ID-INL-14-020 R1.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R1 SECTION A. Project Title: Central Facilities Area (CFA)-623/624 Electric Heat Conversion Project SECTION B. Project Description: This Environmental Checklist is being revised to include the specific measures that are needed to convert the CFA-601 warehouse to electric heat. The previous description included language about electrically heating the warehouses but specifics were not identified. CFA-601 warehouse will be converted to electrically supplied heat by installing a new pole-mounted 500

  7. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  8. Microsoft Word - DOE-ID-INL-09-001redo.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09-001 SECTION A. Project Title: SMC Dial Room SECTION B. Project Description The purpose of this project is to design and construct a new "Specific Manufacturing Capability (SMC) Dial Room" (and to procure/install communications equipment) inside the SMC security controlled area. The project will replace an existing dial room in Test Area North (TAN)-601, which is located at the Test Support Facility (TSF) area of TAN and outside SMC control. Because of the requirement for constant

  9. Microsoft Word - DOE-ID-13-021 Stony Brook EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Self-powered Wireless Dual-mode Langasite Sensor for PressureTemperature Monitoring of Nuclear Reactors - The Research Foundation of State University...

  10. Microsoft Word - DOE-ID-14-053 Boise State University EC B3...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bulk Thermoelectric Generator for Efficient Power Harvesting for Self-powered Sensor Networks - Boise State University SECTION B. Project Description Boise State...

  11. Microsoft Word - DOE-ID-13-071 Hunter College EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Recovery of Uranium from Seawater: Polymer-Supported Aminophosphinates as Selective - Hunter College of the City University of New York SECTION B....

  12. Microsoft Word - DOE-ID-14-052 Syracuse University EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SECTION B. Project Description Syracuse University will perform R&D related to adsorption modeling for the separation and recovery of radioisotopic gases in the off-gas...

  13. Microsoft Word - DOE-ID-15-054 Pittsburgh EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validation Data and Computational Models for Turbulent Mixing of Bypass and Coolant Jet flows in Gas-Cooled Reactors - University of Pittsburgh SECTION B. Project Description...

  14. Microsoft Word - DOE-ID-12-040 ORNL EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a novel in situ method established at ORNL to demonstrate materials with increased resistance to radiation and thermal degradation. In order to complete the project objectives,...

  15. Microsoft Word - DOE-ID-13-033 NC State B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: A Positron Generator System in Support of High Brightness Materials Characterization at the Pulstar Reactor - North Carolina State University SECTION B....

  16. DOE LDRD Project List FY 2015.xlsx

    Energy Savers [EERE]

    ID Project Name FY Total FY2013-MAKl-0513 Demistifying the hydration layer on nano oxide in suspensions by liquid cell Transmission Electron Microscopy $2,183 FY2013-VDOB-0909 Theory and Simulation of Solid-State Nuclear Magnetic Resonance for Characterization of New Materials $116,297 FY2014-LOG-1212 Self-Healing Adaptive Structural Coatings $16,357 FY2014-LWA-0413 Adsorption-induced Shape-changing in Nano alloys: Extended Alloy Wulff Construction with First- principles Calculations $83,539

  17. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  18. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It...

  19. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-02-01 08:06:53

  20. Microsoft Word - DOE-ID-11-019 Lakeshore EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Meeting NUCP Requirements with Equipment Investments - Lakeshore Technical College SECTION B. Project Description Lakeshore Technical College will purchase laboratory equipment including portable radiation survey instruments, radiation detectors, sample holders, an area radiation monitor, air samplers, sealed radioactive sources, contamination control training kits, and a radiation survey simulator necessary to provide student instruction that complies with the

  1. Microsoft Word - DOE-ID-13-034 NC State B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: A Positron Microprobe Spectrometer for Defects and Nano-Vacancy Characterization in Materials - North Carolina State University SECTION B. Project Description North Carolina State University proposes to install a positron (electron antiparticle) microprobe spectrometer for nanophase positron annihilation spectrometry at the North Carolina State University (NCSU) Positron Beam Laboratory, which is located at the NCSU PULSTAR reactor.

  2. Microsoft Word - DOE-ID-14-014 Utah B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Development of Capabilities to Study the Thermodynamics of Nuclear Energy Related Infrastructure at the Utah Nuclear Engineering Program - University of Utah SECTION B. Project Description The University of Utah proposes to acquire an isothermal titration calorimeter (ITC) for the measurement of thermodynamic properties of actinide complexes, and the enhancement of coursework and research efforts

  3. Microsoft Word - DOE-ID-14-015 Idaho State B1-31.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Idaho State University Reactor Laboratory Modernization SECTION B. Project Description Idaho State University proposes to modernize radiation detectors and associated instruments used to perform laboratory experiments and research in the Idaho State University Reactor Laboratory. ISU will upgrade radiation detectors, the sub-critical assembly grid plates, tank filling and draining equipment, and handrails

  4. Microsoft Word - DOE-ID-14-059 MIT EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    59 SECTION A. Project Title: Integrated FHR Technology Development : Tritium Management, Materials Testing, Materials Testing, Salt Chemistry Control, Thermal-Hydraulics and Neutronics with Associated Benchmarking - Massachusetts Institute of Technology SECTION B. Project Description Massachusetts Institute of Technology will conduct research is to address major challenges in the development of commercial Fluoride-salt-cooled High-temperature Reactor (FHR) technology: tritium control;

  5. Microsoft Word - DOE-ID-15-081 Oregon State B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Computational and Experimental Benchmarking for Transient Fuel Testing - Oregon State University SECTION B. Project Description Oregon State University, in collaboration with two universities, three national laboratories, and two industry partners, proposes to develop a comprehensive evaluation of existing Transient Reactor Test (TREAT) Facility neutronics data using the next generation reactor core neutronics codes, perform a complete thermal hydraulic

  6. Aerosol mobility size spectrometer

    DOE Patents [OSTI]

    Wang, Jian (Port Jefferson, NY); Kulkarni, Pramod (Port Jefferson Station, NY)

    2007-11-20

    A device for measuring aerosol size distribution within a sample containing aerosol particles. The device generally includes a spectrometer housing defining an interior chamber and a camera for recording aerosol size streams exiting the chamber. The housing includes an inlet for introducing a flow medium into the chamber in a flow direction, an aerosol injection port adjacent the inlet for introducing a charged aerosol sample into the chamber, a separation section for applying an electric field to the aerosol sample across the flow direction and an outlet opposite the inlet. In the separation section, the aerosol sample becomes entrained in the flow medium and the aerosol particles within the aerosol sample are separated by size into a plurality of aerosol flow streams under the influence of the electric field. The camera is disposed adjacent the housing outlet for optically detecting a relative position of at least one aerosol flow stream exiting the outlet and for optically detecting the number of aerosol particles within the at least one aerosol flow stream.

  7. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  8. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-ORD REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory

  9. ARM - Measurement - Cloud droplet size

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    droplet size Linear size (e.g. radius or diameter) of a cloud particle Categories Cloud Properties Instruments The above measurement is considered scientifically relevant for the...

  10. Demand response medium sized industry consumers (Smart Grid Project...

    Open Energy Info (EERE)

    demand and regulation power in Danish Industry consumers via a price and control signal from the supplier of electricity. The aim is to develop a valuable solution for the...

  11. Microsoft Word - DOE-ID-12-038 NC State EC B3-6 B3-10.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A. Project Title: Nanostructured Fe-Cr Alloys for Advanced Nuclear Energy Applications - North Carolina State University SECTION B. Project Description This project will optimize...

  12. Microsoft Word - DOE-ID-13-079 UC Berkeley EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B. Project Description The University of California, Berkeley proposes to assess the feasibility of designing a sodium-cooled breed-and-burn (B&B) fast reactor that will be able to...

  13. Microsoft Word - DOE-ID-INL-14-004 (1).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan to evaluate the use of BEA's modular hybrid plasma system for use in COGENT's waste-to-energy generation project process. This work was completed to COGENT's satisfaction....

  14. Microsoft Word - DOE-ID-11-006 Clemson EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Development of New Analytical Capabilities for the Measurement of Fundamental Thermodynamic Parameters Supporting Advanced Fuel Cycle Chemistry - Clemson University SECTION B. Project Description Clemson University will purchase an isothermal titration calorimeter. The calorimeter will primarily be utilized in the determination of aqueous stability constants of actinide-ligand systems to support advanced actinide separations processes and in the determination of

  15. Microsoft Word - DOE-ID-11-015 Nevada EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: General Infrastructure to Enhance Nuclear Materials Research and Education at the University of Nevada, Reno SECTION B. Project Description The University of Nevada, Reno (UNR) will purchase and install a custom designed high-temperature and high-pressure dynamic water loop equipment for mechanical and corrosion testing. UNR will evaluate mechanical performance of various alloys at extreme temperature and pressure conditions using a slow strain rate test equipment;

  16. Microsoft Word - DOE-ID-11-016 Midlands EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Nuclear Infrastructure Upgrade to Enhance Teaching Capabilities in the Nuclear Systems Technology Program at Midlands Technical College SECTION B. Project Description Midlands Technical College will purchase a metallographic microscope and imaging workstation to allow students to perform structural defect analysis is simulated radiation-damaged, thermal shocked, and stress and corrosion damaged materials, as well as evaluate other surface properties of materials.

  17. Microsoft Word - DOE-ID-12-005 New Mexico.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SECTION A. Project Title: Equipment Upgrade for the UNM AGN-201M Reactor - University of New Mexico SECTION B. Project Description The University of New Mexico will acquire a computer and associated hardware to measure control rod scram times, a laptop computer and associated electronics such as MCS and MCA systems for operating a High Purity Germanium detector, a Frisker and micro R meter for personnel protection and radiation surveys, a new interface for the data channel, NCRP reports, and

  18. Microsoft Word - DOE-ID-12-013 Colorado School of Mines.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Automated Serial Sectioning and Imaging in Support of Nuclear Materials Analysis - Colorado School of Mines SECTION B. Project Description The Colorado School of Mines will purchase a Robo-Met.3D automated polishing, serial-sectioning, and image acquisition station. The automated serial sectioning and imaging capabilities of the new system will expand the digital microstructure imaging and tomographic capabilities, allowing for the acquisition of micrometer scale 3-D

  19. Microsoft Word - DOE-ID-12-026 Illinois Tech.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 SECTION A. Project Title: Determination of Microstructure and Chemical State Changes in Ion-Irradiated Fuels and Structural Components with a High Kinetic Energy Electron Detector - Illinois Institute of Technology SECTION B. Project Description The Illinois Institute of Technology will purchase a High Kinetic Energy (HiKE) instrument for measuring the structural and chemical changes in ion-irradiated fuels and structural materials for verification of radiation damage models. SECTION C.

  20. Microsoft Word - DOE-ID-12-029 Missouri ST.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Infrastructure Upgrade of Radiation Measurement and Spectroscopy Laboratory at Missouri S&T SECTION B. Project Description The infrastructure upgrade at Missouri S& T includes three identical workstations for radiation detection and measurement systems for alpha particle, beta particle, and gamma ray; one workstation for neutron measurement; and one for x-ray measurement. The workstations will include radiation sources, detectors, oscilloscopes, computers, and