Powered by Deep Web Technologies
Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Property:HPBD/ProjectId | Open Energy Information  

Open Energy Info (EERE)

ProjectId ProjectId Jump to: navigation, search This is a property of type Number. Pages using the property "HPBD/ProjectId" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 203 + High Performance Buildings Database + 358 + High Performance Buildings Database + 71 + High Performance Buildings Database + 833 + High Performance Buildings Database + 247 + High Performance Buildings Database + 20 + High Performance Buildings Database + 498 + High Performance Buildings Database + 132 + High Performance Buildings Database + 194 + High Performance Buildings Database + 323 + High Performance Buildings Database + 50 + High Performance Buildings Database + 785 + High Performance Buildings Database + 223 +

2

National ID project of Nepal: future challenges  

Science Conference Proceedings (OSTI)

Nepal is a small, landlocked and developing country in South Asia. It is bordered by China at North and India at South, East and West. The Government of Nepal, in order to achieve good governance and social-economic development, has initiated the e-Government ... Keywords: Nepal, challenges, government, national ID

Ganesh Prasad Adhikari

2011-09-01T23:59:59.000Z

3

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

4

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

5

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

6

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

7

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

8

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

9

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

10

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

11

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

12

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

13

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

14

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

15

Program or Field Office: Project Title and I.D. No.:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

16

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-668  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

668 668 Title: WH Pigging Water Disposal Description: Subcontractor shall provide all labor, tools, materials (except GFE), equipment and supervision to perform the work associated with the WH Pigging Water Disposal project. Tasks include construction of concrete foundations for pipe supports; installation, testing, and coating of piping; and associated electrical and instrumentation. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

17

BLDG. ID NAME  

NLE Websites -- All DOE Office Websites (Extended Search)

a: main site Building Inventory 2006 appendices BLDG. ID NAME (B)UILDING (T)RAILER MAP GRID REF SIzE (GSF) 002 Advanced Materials Lab B D&24; &24;5,506 002A Central Chemical Storage B D&24;...

18

Demand response medium sized industry consumers (Smart Grid Project) | Open  

Open Energy Info (EERE)

response medium sized industry consumers (Smart Grid Project) response medium sized industry consumers (Smart Grid Project) Jump to: navigation, search Project Name Demand response medium sized industry consumers Country Denmark Headquarters Location Aarhus, Denmark Coordinates 56.162937°, 10.203921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.162937,"lon":10.203921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

19

27-ID and 35-ID Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID, Construction Schedule Electrical and PSS work continues on 35-ID-B and C. Will not run the main...

20

Property:WFSPTurbineID | Open Energy Information  

Open Energy Info (EERE)

WFSPTurbineID WFSPTurbineID Jump to: navigation, search Property Name WFSPTurbineID Property Type Number This is a property of type Number. Pages using the property "WFSPTurbineID" Showing 25 pages using this property. (previous 25) (next 25) A Alleghany High School Wind Project + 110,608 + Appanoose Elementary School Wind Project + 108,442 + Auburn-Washburn Wind Project + 105,237 + Avery County High School Wind Project + 110,607 + B Bancroft-Rosalie Public Schools Wind Project + 108,812 + Bloomfield Public Schools Wind Project + 110,699 + Burlington High School Wind Project + 107,678 + C CAES Wind Project + 105,329 + Cedar Rapids Wind Project + 105,272 + Cherry Valley Elementary School Wind Project + 120,342 + Concordia High School Wind Project + 108,482 +

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

6/10/12 Researchers Develop New Method to Measure Bubble Size Distribution in Pipelines 1/2www.azomining.com/news.aspx?newsID=6367  

E-Print Network (OSTI)

.azomining.com/news.aspx?newsID=6367 0 Posted in | Natural Gas | Oil Shale Read in | English | Español | Français | Deutsch | Português

Sóbester, András

22

Microsoft Word - DOE-ID-INL-13-028.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

and therefore, waste associated DOE-ID-NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-13-028 with project activities is...

23

Document ID Number: RL-721  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform an outdoor, terrestrial ecological research study to attempt to control and deter nesting birds at the 241-C Tank Farm. This will be a preventative study to test possible methods for controlling &/or minimizing the presence and impacts of nesting birds inside the tank farm. A nesting bird

24

RL·721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: REV 3 NEPA REVIEW SCREENING FORM DOE/CX-00045 . J.proj(;l~t Titl~: - - - -- - - - - - - - - - - - - - - - - - -- --------- ------_. . _ - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - LIMITED FIREBREAK MAINTENANCE ON THE HANFORD SITE DURING CALENDAR YEAR 2012 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): The Department of Energy (DOE) proposes to perform firebreak maintenance in selected areas of the Hanford Site during calendar year 2012 with limited use of physical, chemical, and prescribed burning methods. Prescribed burning will be performed by the Hanford Fire Department under approved burn plans and permits; and only in previously disturbed

25

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

26

Microsoft Word - DOE-ID-INL-12-015.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 15 SECTION A. Project Title: Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement SECTION B. Project Description: The purpose of this project is to permanently close and remove the Materials and Fuels Complex (MFC) 4,000 gallon bio-diesel underground storage tank (UST) [Site ID# 7230/Facility ID # 6-120614/Tank ID # 99ANL00013] and remove the 1,000 gallon E-85 aboveground storage tank (AST) [Site ID# 7230/Facility ID# 6-120614/Tank ID# 05MFC00035] and replace the two tanks with a 10,000 gallon aboveground storage tank (AST) split tank (5,000 gallons for bio-diesel/5,000 gallons for E-85). The 4,000 gallon bio-diesel UST and the 1,000 gallon E-85 AST are located in the parking lot area near building MFC-701.

27

5 Super-Sized Solar Projects Transforming the Clean Energy Landscape |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Super-Sized Solar Projects Transforming the Clean Energy Super-Sized Solar Projects Transforming the Clean Energy Landscape 5 Super-Sized Solar Projects Transforming the Clean Energy Landscape April 8, 2013 - 4:00pm Addthis The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo County. | Photo courtesy of SunPower. The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo County. | Photo courtesy of SunPower. Arial shot of the California Valley Solar Ranch in San Luis Obispo County. | Photo courtesy of SunPower. Arial shot of the California Valley Solar Ranch in San Luis Obispo County. | Photo courtesy of SunPower. The Alamosa Solar project in Colorado is the largest high-concentration solar facility in the world. | Photo courtesy of Cogentrix.

28

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

29

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

30

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

31

II.CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

1 1 II.CONTRACT ID CODE ~AGE 1 of AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT PAGES AC 5. PROJECT NO. (If applicable) 3. EFFECTNE DATE 2. AMENDMENTfMODIFICA TION NO. 4. REQUISITIONIPURCHASE REQ. NO. See Block 16c. NOPR 7. ADMINISTERED BY (If other than Item 6) CODE 05008 6. ISSUED BY CODE 05008 U.S. Department of Energy National Nuclear Security Administration U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 P.O. Box 2050 Oak Ridge, TN 37831 9A. AMENDMENT OF SOLICITATION NO. 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Y-12, LLC P.O. Box 2009 MS 8014 9B. DATED (SEE ITEM 11) Oak Ridge, TN 37831-8014 lOA. MODIFICATION OF CONTRACT/ORDER NO.

32

Determination of the potential market size and opportunities for biomass to electricity projects in China  

DOE Green Energy (OSTI)

Efforts are currently underway to assess the market potential and prospects for the US private sector in biomass energy development in Yunnan Province. Among the specific objectives of the study are to: estimate the likely market size and competitiveness of biomass energy, assess the viability of US private sector ventures; assess non-economic factors (e.g., resource, environmental, social, political, institutional) that could affect the viability of biomass energy; and recommend appropriate actions to help stimulate biomass initiatives. Feasibility studies show that biomass projects in Yunnan Province are financially and technically viable. Biomass can be grown and converted to electricity at costs lower than other alternatives. These projects if implemented can ease power shortages and help to sustain the region`s economic growth. The external environmental benefits of integrated biomass projects are also potentially significant. This paper summarizes a two-step screening and rank-ordering process that is being used to identify the best candidate projects for possible US private sector investment. The process uses a set of initial screens to eliminate projects that are not technically feasible to develop. The remaining projects are then rank-ordered using a multicriteria technique.

Perlack, R.D.

1995-08-01T23:59:59.000Z

33

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL/EXT-08-13979 INL/EXT-08-13979 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB National SCADA Test Bed Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 November 2008 INL/EXT-08-13979 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 Idaho National Laboratory Idaho Falls, Idaho 83415 http://www.inl.gov Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under DOE Idaho Operations Office Contract DE-AC07-05ID14517 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB

34

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

35

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

36

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Funding Project as they were the only electric vehicles available for leasing from vehicle manufacturers at the time. Federal Fleet Acquisitions of Electric Vehicles 0 2 4 6...

37

Navigate to http://cris.csrees.usda.gov/cgi-bin/starfinder/0?path=crisassist.txt&id=anon&pass=&OK=OK 1. Select `Any' or specific project type (e.g. Multistate Projects)  

E-Print Network (OSTI)

. Enter Department prefix or CRIS project number (e.g. FLA-FOR) 3. Select status--hold `Ctrl' key--Select all except Terminated 4. Select 500 5. Hit `Search) change `Project Type' to Multistate 14. In `Term. Date' column, if project

Watson, Craig A.

38

DOE/ID-11037  

NLE Websites -- All DOE Office Websites (Extended Search)

into technology classes. Table B-4. Summary of results of feasibility assessment of water energy resources in Alabama. (a) Total Feasible Projects 2,428 Microhydro 2,008 83%...

39

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

Eugene S. Grecheck David P. Batalo

2010-11-30T23:59:59.000Z

40

4-ID-D Instrumentation  

NLE Websites -- All DOE Office Websites (Extended Search)

4-ID-D Instrumentation Detectors Integrating Counting Area Diffractometors 8-Circle 4Tesla Magnet 13 Tesla Magnet Focussing Zone Plate Optics K-B Mirror System Temperature Control...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

September 10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho...

42

Microsoft Word - DOE-ID-INL-13-006.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-NEPA CX DETERMINATION ID-NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

43

Category:Boise, ID | Open Energy Information  

Open Energy Info (EERE)

ID ID Jump to: navigation, search Go Back to PV Economics By Location Media in category "Boise, ID" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Boise ID Idaho Power Co.png SVFullServiceRestauran... 61 KB SVHospital Boise ID Idaho Power Co.png SVHospital Boise ID Id... 62 KB SVLargeHotel Boise ID Idaho Power Co.png SVLargeHotel Boise ID ... 66 KB SVLargeOffice Boise ID Idaho Power Co.png SVLargeOffice Boise ID... 58 KB SVMediumOffice Boise ID Idaho Power Co.png SVMediumOffice Boise I... 63 KB SVMidriseApartment Boise ID Idaho Power Co.png SVMidriseApartment Boi... 61 KB SVOutPatient Boise ID Idaho Power Co.png SVOutPatient Boise ID ... 62 KB SVPrimarySchool Boise ID Idaho Power Co.png SVPrimarySchool Boise ... 62 KB SVQuickServiceRestaurant Boise ID Idaho Power Co.png

44

11. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 PAGE 1 OF2 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE M191 See Block 16C 4. REQUISITION/PURCHASE I 5. PROJECT NO. (If applicable) REQ. NO. 6.ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 87185-5400 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 CODE I FACILITY CODE SA. AMENDMENT OF SOLICITATION NO.

45

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Preferences Related to Public Preferences Related to Consent-Based Siting of Radioactive Waste Management Facilities for Storage and Disposal: Analyzing Variations over Time, Events, and Program Designs Prepared for US Department of Energy Nuclear Fuel Storage and Transportation Planning Project Hank C. Jenkins-Smith Carol L. Silva Kerry G. Herron Kuhika G. Ripberger Matthew Nowlin Joseph Ripberger Center for Risk and Crisis Management, University of Oklahoma Evaristo "Tito" Bonano Rob P. Rechard Sandia National Laboratories February 2013 FCRD-NFST-2013-000076 SAND 2013-0032P Public Preferences Related to Consent Based Siting of Radioactive Waste Management Facilities ii February 2013 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a

46

Microsoft Word - DOE-ID-INL-13-007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

47

Microsoft Word - DOE-ID-INL-13-007.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

48

Schedule and Cost Buffer Sizing How to account for the bias between project performance and your model.  

E-Print Network (OSTI)

Schedule and Cost Buffer Sizing How to account for the bias between project performance and your model. Bias in project performance causes schedule and cost to over-run baseline estimates (your model). Bias is the one-sided tendency of actual schedule or cost to over-run the model. The PMBOK Guide and supporting literature recommend estimating the variability for all project time and cost estimates, and sizing appropriate schedule or cost buffers (also known as contingency or management reserve) using Monte-Carlo analysis or PERT. Critical Chain Project Management (CCPM) uses a similar approach to size buffers (the Square Root of the Sum of the Squares, or SSQ method). These techniques pool the variance from individual task estimates. Statistical pooling of variance does not account for sources of bias 1 in the estimates; i.e., systematic reasons that the estimates may be high or low. This paper describes a number of sources of bias in performance of projects to schedule and cost estimates, and provides recommendations to size buffers that ensure your projects come in under your baseline schedule and budget.

Chain Ccpm; Larry Leach

2002-01-01T23:59:59.000Z

49

JGI - Project List  

NLE Websites -- All DOE Office Websites (Extended Search)

ID NCBI taxonomy ID Show projects from: all ARRA BRC-BESC BRC-GLBRC BRC-JBEI BRC-Multi CSP CSP-ICBG CSP-LD DD Director's Science DOE Legacy DOEM FGP GEBA Genomic Tech Grand...

50

Microsoft Word - DOE-ID-INL-12-003.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-12-003 EC Document No.: DOE-ID-INL-12-003 SECTION A. Project Title: Auxiliary Canal Fill Project at Test Reactor Area (TRA)-670 SECTION B. Project Description: Although the ATR canal meets all design basis criteria, lessons learned following the earthquake and tsunami events at the Fukushima- Daiichi Nuclear Power Plant in March of 2011 indicate that an auxiliary water supply to the fuel storage canal with a fill connection located outside of the facility would have been valuable following the beyond design basis event. As a result of these lessons learned, the Department of Energy (DOE) has allocated additional funding to the Idaho National Laboratory (INL) to mitigate beyond design basis events similar to the Fukushima-Daiichi disaster. The Auxiliary Canal Fill Project is one of the projects being funded from this

51

Microsoft Word - DOE-ID-INL-12-016.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No.: DOE-ID-INL-12-016 No.: DOE-ID-INL-12-016 SECTION A. Project Title: Reverse Osmosis System Removal SECTION B. Project Description: The project will remove a reverse osmosis water treatment system (FU-HA-101) from TAN 681 room 182. The system is out-of-service, with no intent of future use. Work will involve removal of the reverse osmosis system, and associated plumbing/piping and electrical lines and conduit. The project will clear the area of obstacles and tripping hazards associated with unused/unnecessary equipment and utilities. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Project activities will result in generation of an estimated 90 cubic ft. of low-level radioactive waste. Wastes will be characterized and dispositioned through Waste Generator Services. Reuse and recycling of materials will be practiced

52

Battery-Size Regenerative Fuel Cells  

ORNL 2010-G01073/jcn UT-B ID 201002378 Battery-Size Regenerative Fuel Cells Technology Summary A battery-size regenerative fuel cell with energy ...

53

Measurements of Plutonium and Americium in Soil Samples from Project 57 using the Suspended Soil Particle Sizing System (SSPSS)  

Science Conference Proceedings (OSTI)

As part of the preliminary site characterization conducted for Project 57, soils samples were collected for separation into several size-fractions using the Suspended Soil Particle Sizing System (SSPSS). Soil samples were collected specifically for separation by the SSPSS at three general locations in the deposited Project 57 plume, the projected radioactivity of which ranged from 100 to 600 pCi/g. The primary purpose in focusing on samples with this level of activity is that it would represent anticipated residual soil contamination levels at the site after corrective actions are completed. Consequently, the results of the SSPSS analysis can contribute to dose calculation and corrective action-level determinations for future land-use scenarios at the site.

John L. Bowen; Rowena Gonzalez; David S. Shafer

2001-05-01T23:59:59.000Z

54

Federal ID Credential Security Standard Strengthens ...  

Science Conference Proceedings (OSTI)

Federal ID Credential Security Standard Strengthens Authentication, Extends To Mobile Devices. From NIST Tech Beat: September 5, 2013. ...

2013-09-17T23:59:59.000Z

55

Beamline 6-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 2011 2010 2009 2008 All Sector 6 Pubs. APS Pubs. Database Recent 6-ID-D Publications Publications 2013:(24) "Controlling Size-Induced Phase Transformations Using Chemically Designed Nanolaminates," Matt Beekman, Sabrina Disch, Sergei Rouvimov, Deepa Kasinathan, Klaus Koepernik, Helge Rosner, Paul Zschack, Wolfgang S. Neumann, David C. Johnson, Angew. Chem. Int. Ed. 52, 13211 (2013). "Thermophysical and Structural Measurements of Liquid Metallic Alloys Using Electrostatic Levitation," James Christopher Bendert, Ph.D.-Thesis, Washington University , 2013. "Pair distribution function analysis of X-ray diffraction from amorphous spheres in an asymmetric transmission geometry: application to a Zr58.5Cu15.6Ni12.8Al10.3Nb2.8 glass," J.C. Bendert, N.A. Mauro, K.F. Kelton, J. Appl. Crystallogr. 46, 999

56

Microsoft Word - DOE-ID-INL-12-021.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

57

Microsoft Word - DOE-ID-INL-12-012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

58

Microsoft Word - DOE-ID-INL-10-017.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-017 DOE-ID-INL-10-017 SECTION A. Project Title: ATR Complex Dial Room. SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Advanced Test Reactor Complex (ATR Complex) (formerly known as the Test Reactor Area [TRA]) in order to meet the U.S. Department of Energy Office of Nuclear Energy programmatic needs and to provide ongoing critical support at the Idaho National Laboratory (INL). The existing telecommunication and data systems located at the ATR Complex need to be updated to ensure the protection and continuity of telecommunications hardware and software property and provide reliability of communications and data connectivity. The new modular dial room facility will replace existing telecommunications systems equipment (telephony, optical transport, and data network infrastructure

59

Microsoft Word - DOE-ID-INL-12-021.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

60

Microsoft Word - DOE-ID-INL-12-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

MM-Group Home MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights LuFeO Unlikely route to ferroelectricity May 16, 2012 A new type of ferroelectric, LuO2Fe4, has been investigated at the APS by a research team from Julich research center. XAS & XMCD studies on beamline 4-ID-C determined the Fe magnetism and valence, while single crystal x-ray scattering measurements at 6-ID-B & 6-ID-D probed the associated structural and charge ordering.

62

Microsoft Word - DOE-ID-INL-12-018.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

63

Microsoft Word - DOE-ID-INL-10-020.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

64

Microsoft Word - DOE-ID-INL-10-020.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

65

Microsoft Word - DOE-ID-INL-12-024..doc  

NLE Websites -- All DOE Office Websites (Extended Search)

PostingNo.: DOE-ID-INL-12-024 PostingNo.: DOE-ID-INL-12-024 SECTION A. Project Title: Rigby Bus Lot Northwest Entrance SECTION B. Project Description: The purpose of the proposed action is to provide an additional bus entrance to the Rigby Park and Ride Bus Lot. A portion of chain link fencing (running east to west) on the northwest corner of the Rigby Park and Ride Bus Lot would be relocated to allow an opening off of the City of Rigby dirt access road so that buses may enter the Rigby Park and Ride Lot from the northwest. The existing fence material would then be placed across the City of Rigby dirt access road (running north and south). The new entrance would be for buses only. Approximately 4 to 6 buses would use this entrance. No personnel vehicles will have access. Buses would start using the new

66

Microsoft Word - DOE-ID-INL-12-018.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

67

File:INL-geothermal-id.pdf | Open Energy Information  

Open Energy Info (EERE)

id.pdf id.pdf Jump to: navigation, search File File history File usage Idaho Geothermal Resources Size of this preview: 380 × 600 pixels. Full resolution ‎(3,458 × 5,456 pixels, file size: 1.67 MB, MIME type: application/pdf) Description Idaho Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Idaho File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:24, 16 December 2010 Thumbnail for version as of 12:24, 16 December 2010 3,458 × 5,456 (1.67 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

68

Microsoft Word - DOE-ID-INL-13-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 CX Posting No.: DOE-ID-INL-13-012 SECTION A. Project Title: Water Security Test Bed (WSTB) SECTION B. Project Description: This project was extensively described in Environmental Checklists (ECs) Idaho National Laboratory (INL)-13-014 (Overarching [OA] 5) and INL-13-014 Revision (R) 1 (OA 5). Upon review, it was determined that additional planning and detail was required to fully describe the project and associated activities. Both INL-13-014 and R1 to that EC are canceled; this EC will replace them. Future revisions may address additional project details regarding design, construction, and operational details and limitations as they become known through the project planning process. Background Since its inception, the Environmental Protection Agency's (EPA) Homeland Security Research Program (Sponsor) has been providing

69

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 I. Project Title: Washington River Protection Solutions & Advanced Technologies & Laboratories International- Proposed Actions For CY 2012 Scheduled To Take Place Under CX B3.6, "Small-Scale Research and Development, Laboratory Operations, and Pilot Projects" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) & Advanced Technologies & Laboratories International Inc. (ATL) will perform indoor bench-scale & small-scale research & development projects, conventional laboratory operations, & pilot projects to verify proof- of-concept, on & near the Hanford Site during Calendar Year 2012. WRPS & ATL will perform

70

APS Beamline 6-ID-B,C  

NLE Websites -- All DOE Office Websites (Extended Search)

B,C Home B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. Research on this beamline centers on general x-ray scattering studies of materials. The beamline has 2 end-stations: 6-ID-B: Psi -Diffractomter & In-Field Studies 6-ID-C: UHV in-situ growth Recent Research Highlights LSMO pictures Searching for Next-Generation Electronic Materials December 14, 2009 A new class of layered oxide materials discovered thanks to research at the beamline 6-ID-B offers scientists unprecedented opportunities for creating the next generation of electronic devices. Local Contact: Phil Ryan Local Contacts: Philip Ryan (Surface Diffraction) 630.252.0252 ryan@aps.anl.gov

71

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 NEPA REVIEW SCREENING FORM DOE/CX-00075 I. Project Title: Project 1-718, Electrical Utili ties Transformer Management Support Facility II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): The proposed action includes design, procurement, and construction of a pre-engineered metal building for transformer management; including inspections, routine maintenance, testing, refurbishing, and disposition of excess transformers. The building will be constructed in the previously disturbed, gravel-covered electrical utilities lay-down yard west of the 2101-M Building in 200 East Area of the Hanford Site. The building footprint

72

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

reactor tests. The Idaho Cleanup Project will treat the sodium-contaminated debris in a hot cell, where the waste will be sorted and segregated before it is loaded into baskets...

73

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID Number: ID Number: REV4 NEPA REVIEW SCREENING FORM DOE/CX-00125, Rev 0 I. Project Title: MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 II. Project Description and location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or

74

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 I. Project Title: Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Under CX B1. 22, "Relocation of Buildings" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will relocate buildings on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1. 22. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13 and J.14. Activities would include, but are not

75

RL-721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 I. Project Title: Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Under CX B2.5, "Facility Safety and Environmental Improvements" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will perform safety and environmental improvements of a facility, including the replacement/upgrade of facility components on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart 0, & CX B2.5. WRPS' facilities include all those identified in

76

Microsoft Word - DOE-ID-INL-13-019.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 SECTION A. Project Title: University Boulevard Water Meter Installation SECTION B. Project Description: This project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-681 (UB2), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, ID during the projected time period of August and September, 2013 at an approximate cost of $20 K - $95 K depending upon whether the work can be completed from inside the building(s) or must be performed exterior to the building(s). SECTION C. Environmental Aspects or Potential Sources of Impact: Air Emissions: If excavation is required, the activity has the potential to generate fugitive dust. All reasonable precautions shall be

77

Department of Energy Idaho - Inside DOE-ID  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) Strategic Plan Idaho Operations Office (DOE-ID) - 888 KB DOE-ID Agreement in Principle...

78

1-ID: Sector 1, Insertion Device Beamline  

NLE Websites -- All DOE Office Websites (Extended Search)

1-ID beamline schematic 1-ID beamline schematic ID on-axis brilliance values 1-ID - Sector 1, Insertion Device Beamline Responsible Scientists Jon Almer, phone: (630) 252-1049, e-mail: almer@aps.anl.gov Sarvjit Shastri, phone: (630) 252-0129, e-mail: shastri@aps.anl.gov John Okasinski, phone: (630) 252-0162, e-mail: okasinski@aps.anl.gov Peter Kenesei, phone: (630) 252-0133, e-mail: kenesei@aps.anl.gov Scientific Programs Coupled high-energy SAXS/WAXS studies (HE-SAXS/WAXS) High-energy diffraction microscopy (HEDM) Single-grain studies Stress/strain/texture studies Pair-distribution function (PDF) measurements High-energy fluorescence Source Characteristics Upstream insertion device: APS Undulator A No. of Poles 72 Undulator Period 3.3 cm Device Length 2.4 m Minimum Gap 11 mm Downstream insertion device

79

IPS: IDS or IPS: what is best?  

Science Conference Proceedings (OSTI)

Intrusion detection systems (IDS) have become one of the most common countermeasures in the network security arsenal. But while other technologies such as firewalls and anti-virus provide proactive protection, most current IDSs are passive; detection ...

Maria Papadaki; Steven Furnell

2004-07-01T23:59:59.000Z

80

Annual Planning Summaries: Idaho Operations Office (ID) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home Annual Planning Summaries: Idaho Operations Office (ID) Annual Planning Summaries: Idaho Operations Office (ID)...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Id-1 and Id-2 genes and products as markers of epithelial cancer  

DOE Patents (OSTI)

A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

Desprez, Pierre-Yves (El Cerrito, CA); Campisi, Judith (Berkeley, CA)

2008-09-30T23:59:59.000Z

82

DOI-BLM-ID-220-2009-EA-3709 | Open Energy Information  

Open Energy Info (EERE)

ID-220-2009-EA-3709 ID-220-2009-EA-3709 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-220-2009-EA-3709 EA at Raft River Geothermal Area for Geothermal/Exploration Raft River Geothermal Drilling Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Agua Caliente, LLC Consultant EMPSi Geothermal Area Raft River Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Exploration Drilling Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

83

Microsoft Word - DOE-ID-INL-12-028-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-12-028 EC Document No.: DOE-ID-INL-12-028 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study SECTION B. Project Description: The National Oceanic and Atmospheric Administration (NOAA) Birch Creek Valley Wind Study would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). The project would use a location near the northeast corner of the Test Area North (TAN) perimeter fence just north of the old TAN parking lot adjacent to the road to the Initial Engine Test (IET) facility and a remote site along Birch Creek near the point where Birch Creek crosses Idaho Highway 22. Field setup would occur as

84

GRR/Section 8-ID-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

8-ID-a - State Transmission 8-ID-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-ID-a - State Transmission 08IDAStateTransmission.pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies IC §67-6508: Local Land Use Planning Duties IC §61-526: Certificate of Public Convenience and Necessity Triggers None specified Click "Edit With Form" above to add content 08IDAStateTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-ID-a.1 - Will the Transmission Project Be Undertaken by a Public Utility?

85

GRR/Section 4-ID-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

4-ID-a - State Exploration Process 4-ID-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-ID-a - State Exploration Process 04IDAStateExplorationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Triggers None specified Click "Edit With Form" above to add content 04IDAStateExplorationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 4-ID-a.1 - Has the Environmental Process been Completed for Exploration? If an EA/EIS has not yet been completed for this portion of the project, the developer must first complete the applicable environmental process.

86

International Degree (ID) and Engineering For complete information and admission requirements for the ID, refer to the "Passport to the International  

E-Print Network (OSTI)

credits which apply toward the degree. The ID program advisor works closely with each student to help develop a unique program that meets their needs and future goals. Students will also work with a thesis a structural engineer on the Hanford vitrification design-build project How can I get started

Escher, Christine

87

Microsoft Word - DOE-ID-INL-13-008.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

88

Microsoft Word - DOE-ID-INL-13-008.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

89

Microsoft Word - DOE-ID-INL-12-023.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

90

Microsoft Word - DOE-ID-INL-13-006.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

91

Microsoft Word - DOE-ID-INL-12-023.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

92

Location-based security for ID document and ID card enrollment stations  

Science Conference Proceedings (OSTI)

Much of today's security for financial assets, services, facilities, personal information, immigration, employment and travel is provided in the form of a variety of ID instruments such as passports, credit cards, ID badges, access cards, and other similar ... Keywords: RFID, identity management systems, identity verification, location-based security, physical unclonable functions

Eugene P. Gerety; Khaled M. Elleithy

2011-04-01T23:59:59.000Z

93

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

D Home D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights A New Family of Quasicrystals A New Family of Quasicrystals June 24, 2013 Scientists from the U.S. Department of Energy's Ames Laboratory and Iowa State University have used the high energy x-rays available on beamline 6-ID-D, to confirm the structure of the only known magnetic rare earth icosahedral binary quasicrystals. Contacts: Alan Goldman & Paul Canfield - Iowa State Univ. & Ames Lab Local Contacts:

94

Requesting a Digital ID | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requesting a Digital ID Requesting a Digital ID Requesting a Digital ID Step One - Registering with MIS To request a DOE Digital Identity you must first register in DOE's Management Information System (MIS) by going to https://mis.doe.gov, selecting "Requesting Access" and following the onscreen instructions. Note: DOE Federal employees are already registered and do not need to complete this step, they may skip to step 2. During the registration process you will be required to search for, and select, a DOE sponsor. Your DOE sponsor is the DOE federal employee that is certifying that you have a recognized relationship with the Department and have a valid need for a DOE Digital Identity. For contractors this person is often your Contract Task Manager, Contracting Officer's Representatives

95

DOI-BLM-ID-I020-2012-0017-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-I020-2012-0017-CX DOI-BLM-ID-I020-2012-0017-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-I020-2012-0017-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type CX Applicant Idaho Geological Survey Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 272 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Idaho Falls District Office Managing Field Office BLM Pocatello Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 10/21/2011

96

GRR/Section 9-ID-a - State Environmental Process | Open Energy Information  

Open Energy Info (EERE)

9-ID-a - State Environmental Process 9-ID-a - State Environmental Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-ID-a - State Environmental Process 09IDAStateEnvironmentalProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Triggers None specified Click "Edit With Form" above to add content 09IDAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has no state-specific EA/EIS equivalent for renewable energy projects. Idaho does have an environmental assessment process for proposed wastewater and drinking water construction projects, but only when grant

97

DOI-BLM-ID-T020-2012-0003-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-T020-2012-0003-CX DOI-BLM-ID-T020-2012-0003-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-T020-2012-0003-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office BLM Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

98

DOI-BLM-ID-110-2009-3825-CE | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-110-2009-3825-CE DOI-BLM-ID-110-2009-3825-CE Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-110-2009-3825-CE CX at Crane Creek Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Crane Creek Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 113 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 6/4/2009

99

DOI-BLM-ID-B010-2010-0083-CX | Open Energy Information  

Open Energy Info (EERE)

ID-B010-2010-0083-CX ID-B010-2010-0083-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-B010-2010-0083-CX CX at {{{GeothermalArea}}} for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments ROW across BLM managed lands for access to TGH locations Time Frame (days) Participating Agencies Lead Agency Idaho Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office

100

Microsoft Word - DOE-ID-INL-12-022.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - DOE-ID_INL-13-010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: North Boulevard Annex Lease Termination SECTION B. Project Description: The proposed activity would terminate the current lease of the North Boulevard Annex (IF-613) at 2095 North Boulevard in Idaho Falls, ID on or about July 31, 2013 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur prior to the lease termination to ensure the facility is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,000.00. SECTION C. Environmental Aspects or Potential Sources of Impact: Generating and Managing Waste: Various quantities of industrial waste (non-hazardous, non-radioactive) such as office trash are removed from the building for pickup and transportation by garbage collection services prior to lease termination.

102

Microsoft Word - DOE-ID-INL-12-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

103

Microsoft Word - DOE-ID-INL-13-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho National Laboratory Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-13-022 SECTION A. Project Title: Global Threat Reduction Initiative (GTRI) Irradiated Experiment Shipping Capability SECTION B. Project Description: The General Electric (GE) 2000 Model Cask is currently used to support the Global Threat Reduction Initiative (GTRI) irradiated experiment shipments from the Advanced Test Reactor (ATR) at Idaho National Laboratory's (INL) ATR Complex to the Hot Fuel Examination Facility (HFEF) at INL's Materials and Fuels Complex (MFC). However, due to changes in GE-Hitachi's business model, the continued availability of the GE Model 2000 cask is not guaranteed. Furthermore, the internal cavity of the GE Model 2000 cask is too short to support shipment of some larger GTRI experiments. The purpose of the proposed action is to develop and implement a

104

Microsoft Word - DOE-ID-INL-12-006.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: International Way Office Building Lease Termination SECTION B. Project Description: The proposed activity will terminate the current lease of the International Way Office Building (IF-674, IWB) at 1690 International Way in Idaho Falls, ID on or about March 28, 2012 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur on or about March 26 to ensure the building is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Small amounts of industrial waste (non-hazardous, non-radioactive) such as office trash are

105

Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008  

E-Print Network (OSTI)

and end-use sector energy prices to projects using marketproject costs and energy prices across time to account forinvolve escalating future energy prices. Because practices

Goldman, Charles A.

2013-01-01T23:59:59.000Z

106

Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008  

E-Print Network (OSTI)

market trends: an empirical analysis of project data. Energyand market trends provides insights into the distinctive features and policy drivers of a relatively mature private sector energy

Goldman, Charles A.

2013-01-01T23:59:59.000Z

107

ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP)  

NLE Websites -- All DOE Office Websites (Extended Search)

ADVANCED MIXED WASTE TREATMENT PROJECT Idaho Treatment Group, LLC (ITG) Contract No. DE-EM0001467 You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations >...

108

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workover Support Activities, 2016-2020 Workover Support Activities, 2016-2020 Description: This document covers the support activities of equipment rental, purchase of materials (pipe casing, etc.) and services under DM supervision for oil caverns and/or brine disposal wells associated with SPR Site Workovers during the period from 2016 to 2020. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

109

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multiple Multiple Title: ADAS System Life Cycle Support, 2012-2015 Description: Subcontractor shall provide annual telephone support and hardware/software update support for the ARINC AIM alarm display and annunciation system (ADAS) security systems used at the SPR from 2012-2015. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

110

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bi-Annual Electrical PM (2012-2016) Bi-Annual Electrical PM (2012-2016) Description: Subcontractor shall provide all transportation, test/repair equipment, labor and technical supervision required to perform bi-annual preventative maintenance of all electrical equipment at all SPR sites from 2012-2016. Tasks include on-site testing, inspection, and calibration of the electrical equipment. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

111

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Blast and Paint BM Heat Exchangers Description: Subcontractor shall perform blasting and painting of the BM heat exchangers and associated piping. Regulatory...

112

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multiple Multiple Title: Third Party Services for SPR Workovers Description: Subcontractor shall furnish all labor, supervision, tools, materials, equipment, supplies, transportation and facilities required to perform remediation workovers of SPR cavern wellbores and brine disposal wells. Typical remediation workovers include cementing a steel liner inside existing cased wellbore, and permanently plugging and abandoning wells. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment ( categorical exclusions).

113

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. PR-10084713  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PR-10084713 PR-10084713 Title: Purchase of BH Control Valve Assembly Description: Vendor shall supply and deliver one 16-inch, 600# Control Valve Assembly to the Big Hill SPR site. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D; (2) There are no extraordinary circumstances related to the proposal that may affect the

114

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart and Calibrated Pig Surveys of SPR Raw Water/Crude Oil Pipelines, 2013-2018 Smart and Calibrated Pig Surveys of SPR Raw Water/Crude Oil Pipelines, 2013-2018 Description: Subcontractor shall provide all labor, materials, supervision, equipment and transportation required to perform a 360 o internal high resolution instrumented corrosiontoo survey (smart survey) and a 360 o internal high electronic caliper pig survey of raw water and crude oil pipelines at all SPR sites from 2013-2018, as required. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

115

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. PR 10069318  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

318 318 Title: WH Air Conditioning/Heating Repairs, 2010-2013 Description: Subcontractor shall provide all labor, materials, tools, equipment, transportation and supervision required to tear down, inspect, and perform minor repairs to the air conditioning and heating units at WH on a "will call or as needed basis" during the period from 2010 to 2013. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

116

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subcontractor shall furnish all materials, tools, equipment, consumables, supplies, transportation, labor, supervision, and services needed to install a new chain link fence...

117

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

shall perform a structural assessment of concrete structures at the Big Hill Raw Water Intake Structure, the Big Hill Brine Disposal Pump Pad, and the Bryan Mound Raw...

118

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and services required to install erosion protection on the adjacent banks of the BH Raw Water Intake Structure. Regulatory Requirements: NEPA Implementing Procedures (10 CFR...

119

Searchlight Wind Energy Project FEIS Appendix F  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F F Page | F 22B Appendix F: Literature Review of Socioeconomic Effects of Wind Project and Transmission Lines Searchlight Wind Energy Project FEIS Appendix F Page | 1 Prepared for" The Bureau of Land Management For the Searchlight Wind Energy Project Prepared by Bootstrap Solutions 752 E. Braemere Road Boise, ID 83702 Literature on Property Value Impacts of Wind Projects The economic effects of wind energy projects have been well documented. Several studies that have evaluated potential property value impacts are highlighted below (organized chronologically). No clear inference can be drawn from these studies and available research as the analyses vary in terms of rigor; methodology (e.g., survey sampling, statistical analysis, and expert opinion); size, location and site

120

Microsoft Word - DOE-ID-INL-13-004 R1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-13-004 R1 EC Document No.: DOE-ID-INL-13-004 R1 SECTION A. Project Description: High Density Fuel Material for Light Water Reactors (LWRs) SECTION B. Project Description: This project proposes to install glove boxes, laboratory equipment and laboratory hoods in the east wing of the Experimental Fuels Facility (EFF), building 794, at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The building was previously known as the Contaminated Equipment Storage Building (CESB). The purpose of this project is to support a high density fuel material development activity for Light Water Reactors (LWRs). The proposed action transfers process equipment from the Idaho Nuclear Technology and Engineering Center (INTEC) Chemical Process Plant (CPP)-1634 to EFF. Activities at CPP-1634 were

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Property:DSIRE/Id | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:DSIRE/Id Jump to: navigation, search This is a property of type String. DSIRE Incentive Code. Pages using the property "DSIRE/Id" Showing 25 pages using this property. (previous 25) (next 25) 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) + US04F + 3 30% Business Tax Credit for Solar (Vermont) + VT31F + A AEP (Central and North) - CitySmart Program (Texas) + TX141F + AEP (Central and North) - Residential Energy Efficiency Programs (Texas) + TX116F + AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) + TX119F + AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) + TX141F + AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) + TX138F +

122

Property:GBIG/GreenButtonID | Open Energy Information  

Open Energy Info (EERE)

GreenButtonID Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGGreenButtonID&oldid509348" What...

123

Microsoft Word - DOE-ID-INL-11-005.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

protective equipment (PPE) where practical. DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-11-005 Releasing Contaminants - Diesel...

124

Microsoft Word - DOE-ID-INL-12-015.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

direction of Waste Generator Services (WGS). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-12-015 Releasing Contaminants - The...

125

Guided Summarization Results GOOGLE Google Inc Run ID ...  

Science Conference Proceedings (OSTI)

Page 1. Guided Summarization Results GOOGLE Google Inc Run ID: GOOGLE1 Overall Responsiveness 1.000 Overall ...

2012-02-27T23:59:59.000Z

126

Microsoft Word - DOE-ID-INL-13-025.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

2 of 4 EC Document No.: DOE-ID-INL-13-025 DOE-ID-NEPA CX DETERMINATION Idaho National Laboratory Page 3 of 4 EC Document No.: DOE-ID-INL-13-025 All conduit located on the...

127

Entity Name: ABC Company Entity ID:  

Gasoline and Diesel Fuel Update (EIA)

Entity Name: Entity Name: ABC Company Entity ID: 00000 Data Year: 2013 State Include or exclude pre-arranged interruptions? 1 2 3 Do you capture outage records for events that initiate outside your system (customer system that causes di 4 5 6 7 8 Point to calculation in P1782: use percentages weighted based upon the classification of the circuit. 9 10 11 12 REWORD: The percent of customers automatically reported when they have lost power? e.g. SCADA, AMI, Etc. 13 SAIDI value (w/o Major Events included) FORM EIA-861 OMB No. 1905-0129 ANNUAL ELECTRIC POWER INDUSTRY REPORT

128

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

129

Facility Representative Program ID Selects FR of the Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program ID Selects Facility Representative Program ID Selects FR of the Year John Martin DOE-ID Facility Representative John Martin DOE-ID Facility Representative of the Year. John Martin was selected as DOE-ID's Facility Representative of the Year and the office's nominee for the 2007 DOE Facility Representative of the Year Award. John was selected from an exceptional field of candidates to represent DOE-ID at the Facility Representative Annual Workshop in Las Vegas this May. Each year the Department of Energy recognizes the Facility Representative whose achievements during the calendar year are most exemplary. A panel of senior personnel representing the Office of Health, Safety and Security (HSS) National Nuclear Security Administration (NNSA), Environmental Management (EM), Science (SC), Nuclear Energy (NE) and at least five

130

DOI-BLM-ID-B010-2010-??-CX | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » DOI-BLM-ID-B010-2010-??-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-B010-2010-??-CX CX at Weiser Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Weiser Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Decision Document Date 9/30/2010

131

Microsoft Word - DOE-ID-12-011 RESL XRF EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: DOE-ID/RESL Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development SECTION B. Project Description The DOE-ID Radiological & Environmental Sciences Laboratory (RESL) has a need for a complete state-of-the-art fully automated sequential wavelength-dispersive X-ray fluorescence (WD-XRF) spectrometer system. The WD-XRF spectrometer system will be primarily used for elemental analyses of soil, liquids (waters), air filters, unknown precipitates, and other environmental samples, as well as for quality control of other materials used in the preparation of performance testing materials for radiological and inorganic testing programs. SECTION C. Environmental Aspects / Potential Sources of Impact

132

Microsoft Word - DOE-ID-12-011 RESL XRF EC.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 SECTION A. Project Title: DOE-ID/RESL Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development SECTION B. Project Description The DOE-ID Radiological & Environmental Sciences Laboratory (RESL) has a need for a complete state-of-the-art fully automated sequential wavelength-dispersive X-ray fluorescence (WD-XRF) spectrometer system. The WD-XRF spectrometer system will be primarily used for elemental analyses of soil, liquids (waters), air filters, unknown precipitates, and other environmental samples, as well as for quality control of other materials used in the preparation of performance testing materials for radiological and inorganic testing programs. SECTION C. Environmental Aspects / Potential Sources of Impact

133

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

134

Beamline 4-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 2011 2010 2009 2008 All Sector 4 Pubs. APS Pubs. Database Recent 4-ID-D Publications Publications 2013:(13) "Classical and quantum phase transitions revealed using transport and x-ray measurements," Arnab Banerjee, Ph.D.-Thesis, University of Chicago, 2013. "Charge transfer and multiple density waves in the rare earth tellurides," A. Banerjee, Yejun Feng, D.M. Silevitch, Jiyang Wang, J.C. Lang, H.-H. Kuo, I.R. Fisher, T.F. Rosenbaum, Phys. Rev. B 87, 155131 (2013). "Local structure, stripe pinning, and superconductivity in La1.875Ba0.125CuO4 at high pressure," G. Fabbris, M. Hücker, G.D. Gu, J.M. Tranquada, D. Haskel, Phys. Rev. B 88, 060507(R) (2013). "Different routes to pressure-induced volume collapse transitions in

135

SLAC Dosimeter / ID Request Form A  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 SLAC Dosimeter / ID Request Form A (For applicants who have completed SLAC Environment, Safety, and Health Training) Sections 1-5 completed by applicant. Section 1: Contact Information Last name: First name: MI: Male Female Birth year (yyyy): Job title: Contact information/mailing address: City: State: Zip code: Country: Dept/Group: Phone number: Mail stop: Users or non-SLAC employees only: List employer, company, or university : Section 2: Identification Badge Request I am applying for my first SLAC identification badge; I have successfully completed the following ES&H training (indicate all that apply): SON SOC EOESH GERT RWT I RWT II

136

File:USDA-CE-Production-GIFmaps-ID.pdf | Open Energy Information  

Open Energy Info (EERE)

ID.pdf ID.pdf Jump to: navigation, search File File history File usage Idaho Ethanol Plant Locations Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 212 KB, MIME type: application/pdf) Description Idaho Ethanol Plant Locations Sources United States Department of Agriculture Related Technologies Biomass, Biofuels, Ethanol Creation Date 2010-01-19 Extent State Countries United States UN Region Northern America States Idaho External links http://www.nass.usda.gov/Charts_and_Maps/Ethanol_Plants/ File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:13, 27 December 2010 Thumbnail for version as of 16:13, 27 December 2010 1,650 × 1,275 (212 KB) MapBot (Talk | contribs) Automated bot upload

137

Mobile ID Device Best Practice Recommendation Version 1.0  

Science Conference Proceedings (OSTI)

Page 1. Mobile ID Device Best Practice Recommendation Version 1.0 Shahram Orandi R. Michael McCabe Information Access Division ...

2012-03-11T23:59:59.000Z

138

,"Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2012 ,"Release Date:","172014" ,"Next...

139

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID The...

140

Capital Asset Project List 2013-07-08.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(ISFF) Project INL CD0 TBD ID-0014B.C2 Calcine Disposition Project (CDP) INL CD0 TBD IFDP Integrated Facility Disposition Project (IFDP) Oak Ridge CD1 TBD OR-0013B.C1 Sludge...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A database of anomalous traffic for assessing profile based IDS  

Science Conference Proceedings (OSTI)

This paper aims at proposing a methodology for evaluating current IDS capabilities of detecting attacks targeting the networks and their services. This methodology tries to be as realistic as possible and reproducible, i.e. it works with real attacks ... Keywords: KDD'99, ROC curves, attack traces, statistical evaluation of IDS

Philippe Owezarski

2010-04-01T23:59:59.000Z

142

IDS Climate Change and Development Centre Resources | Open Energy  

Open Energy Info (EERE)

IDS Climate Change and Development Centre Resources IDS Climate Change and Development Centre Resources Jump to: navigation, search Tool Summary Name: IDS Climate Change and Development Centre Resources Agency/Company /Organization: Institute of Development Studies Sector: Energy, Land Topics: Policies/deployment programs Resource Type: Workshop, Publications, Training materials, Lessons learned/best practices References: Institute of Development Studies CCDC[1] Logo: IDS Climate Change and Development Centre Resources CCDC promotes "collaborative research and policy analysis, delivering high quality research programmes, knowledge services, teaching and training." References ↑ "Institute of Development Studies CCDC" Retrieved from "http://en.openei.org/w/index.php?title=IDS_Climate_Change_and_Development_Centre_Resources&oldid=375095"

143

Final Report: DOE/ID/14215  

SciTech Connect

The proposed straw separation system developed in the research project harvests the large internode sections of the straw which has the greater potential as a feedstock for lignocellulosic ethanol production while leaving the chaff and nodes in the field. This strategy ensures sustainable agriculture by preventing the depletion of soil minerals, and it restores organic matter to the soil in amounts and particle sizes that accommodate farmers needs to keep tillage and fertilizer costs low. A ton of these nutrient-rich plant tissues contains as much as $10.55 worth of fertilizer (economic and energy benefits), in terms of nitrogen, phosphorus, potassium, and other nutrients provided to the soil when incorporated by tillage instead of being burned. Biomass conversion to fermentable sugars for the purpose of producing fuels, chemicals, and other industrial products is well understood. Most bioenergy strategies rely on low-cost fermentable sugars for sustainability and economic viability in the marketplace. Exploitation of the whole cropspecifically, wheat straw or other plant material currently regarded as residue or wasteis a practical approach for obtaining a reliable and low-cost source of sugars. However, industrial-scale production of sugars from wheat straw, while technically feasible, is plagued by obstacles related to capital costs, energy consumption, waste streams, production logistics, and the quality of the biomass feedstock. Currently available separation options with combine harvesters are not able to achieve sufficient separation of the straw/stover and chaff streams to realize the full potential of selective harvest. Since ethanol yield is a function of feedstock structural carbohydrate content, biomass anatomical fractions of higher product yield can have a significant beneficial impact on minimum ethanol selling price. To address this advanced biomass separation computation engineering models were developed to more effectively and efficiently engineer high-fidelity and high throughput separation systems for biomass components. INL and Iowa State University developed a computational modeling strategy for simulating multi-phase flow with an integrated solver using various computational fluid dynamics (CFD) codes. ISU set up a classic multi-phase test problem to be solved by the various CFD codes. The benchmark case was based on experimental data for bubble gas holdup and bed expansion for a gas/solid fluidized bed. Preliminary fluidization experiments identified some unexpected fluidization behavior, where rather than the bed uniformly fluidizing, a blow out would occur where a hole would open up in the bed through which the air would preferentially flow, resulting in erratic fluidization. To improve understanding of this phenomena and aid in building a design tool, improved computational tools were developed. The virtual engineering techniques developed were tested and utilized to design a separation baffle in a CNH combine. A computational engineering approach involving modeling, analysis, and simulation was used in the form of virtual engineering to design a baffle separator capable of accomplishing the high-fidelity residue separation established by the performance targets. Through the use of the virtual engineering model, baffle designs were simulated to (1) determine the effect of the baffle on the airflow of the combine cleaning system, and (2) predict the effectiveness of the baffle in separating the residue streams. A baffle design was selected based on the virtual engineering modeling, built into the INL selective harvest test combine. The result of the baffle changes improved the crop separation capability of the combine, enabling downstream improvement in composition and theoretical ethanol yield. In addition, the positive results from the application of the virtual engineering tools to the CNH combine design resulted in further application of these tools to other INL areas of research. INL and the University of Idaho identified, characterized, and modified a key plant biosynt

Kenneth Bryden; J. Richard Hess; Thomas Ulrich; Robert Zemetra

2008-08-18T23:59:59.000Z

144

11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

11. CONTRACT ID CODE 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C 05008 4. REQUISITION/PURCHASE REQ. NO. 7. ADMINISTERED BY (If other than Item 6) 15. PROJECT NO. (If applicable) CODE 1 0 5 0 0 8 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S. Department of Energy U. S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 Building 9704-2 Building 9704-2 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., str**t, county, SIal. and ZIP Code) ABCOCK & WILCOX TECHNICAL SERVICES Y-12, ttn: WILLIE J. WILSON o BOX 2009 02 SCARBORO RD. , Nl.149/MS 8004 AK RIDGE TN 378318004

145

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along the "Curry Main" and multi-size pipeline replacing a segment of delivery canal along the "North Branch / East Main"). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $29.87 per ac-ft and energy savings are measured at an aggregate value of $0.0000595 per BTU (i.e., $0.203 per kwh). In addition, expected values are indicated for the Bureau of Reclamation's three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $50.90 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0000777 per BTU ($0.265 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.01.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-11-01T23:59:59.000Z

146

Microsoft Word - DOE-ID-INL-13-009 R1.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

09 R1 09 R1 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Project Sagebrush Atmospheric Tracer Dispersion Study Revision 1 SECTION B. Project Description: This revision of this EC is being prepared to provide estimated quantities of tracer emissions to account for greenhouse gas (GHG) emissions and to clarify that the National Oceanic and Atmospheric Administration (NOAA) would report GHG emissions as required by Executive Order (EO) 13514. The National Oceanic and Atmospheric Administration's (NOAA) Atmospheric Tracer Dispersion Study, formally called Project Sagebrush, would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement (MOA) between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). This MOA

147

Microsoft Word - Project_Fact_Sheet_wPictures_FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Microholes for Oil Production and Microholes for Oil Production and Emplacement of Subsurface Seismic Instrumentation ID Number: 03FE06-4 Program The goals of the present Phase II project are (1) to demonstrate the use of microboreholes with 1-in.-diameter, retrievable seismic arrays installed in the bores, to collect high quality seismic data at a substantially reduced cost compared with the use of conventional-sized boreholes, and (2) to determine if higher quality seismic data can be obtained in a microhole well completion that is designed to enhance seismic-data collection. This project evolved from the earlier Phase I project with a goal to demonstrate the use of microboreholes for use as producing oil wells. Project Goals The overall objective of the Los Alamos National Laboratory (Los Alamos) Phase II

148

2010 Annual Planning Summary for Idaho Operations Office (ID...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Idaho Operations Office (ID) More...

149

Microsoft Word - DOE-ID-INL-13-006 R1-(INL-13-019 R1-redline).docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-13-006 R1 EC Document No.: DOE-ID-INL-13-006 R1 SECTION A. Project Title: Power Line Configuration - 2013-1 R1 SECTION B. Project Description: Rev 1 Based on recommendations by the Idaho National Laboratory (INL) Cultural Resource Management (CRM) Office, the route of the insulated cables on the ground has been changed. The new route replaces Fig 1 in the original Environmental Checklist (EC) and is shown in the figure, below. The new route has been surveyed by both the INL CRM Office and Biological Resources personnel. All Environmental Aspects and Work Activities identified in the original EC remain valid. All requirements and conditions identified in the original EC remain effective. Original EC This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure

150

Scientific American: Rapid Victories Against Extreme Poverty http://www.sciam.com/print_version.cfm?articleID=5B978D32-E7F2-... 1 of 2 4/24/2007 11:39 AM  

E-Print Network (OSTI)

://www.sciam.com/print_version.cfm?articleID=5B978D32-E7F2-... 2 of 2 4/24/2007 11:39 AM The Millennium Villages Project, a public-private

151

RL·721 Do~)nt ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Do~)nt ID Number: REV4 NEPA REVIEW SCREENING FORM " 8)( ... /){)(!) 7 !J --Jil.P:G-3·&-'1-2-0·0~~ 1. Project Title: CH2MHill Plateau Remedia t'ion co. - Routine Maintenance and Custodial Services August 2012 to August 2013 11. Project Description and Location (Including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will conduct routine maintenance and custodial services on and near the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CF'R 1021, Appendix B, ex Bl. 3, nRoutine Maintenance Servj.ces" and "Routine

152

User account | SAML IdM  

NLE Websites -- All DOE Office Websites (Extended Search)

account(active tab) account(active tab) Log in Request new password Type Of User * Public Publisher Display Name * E-mail * A valid e-mail address. All e-mails from the system will be sent to this address. The e-mail address is not made public and will only be used if you wish to receive a new password or wish to receive certain news or notifications by e-mail. First Name Middle Name Last Name Organization Type * - Select a value - Federal Government Local Government State Government Non-Profit Tribal University Other Agency * None Alaska Natural Gas Transportation Projects American Battle Monuments Commission Appalachian Regional Commission Broadcasting Board of Governors Chemical Safety Board Christopher Columbus Fellowship Foundation Commodity Futures Trading Commission Congressional Budget Office Consumer Financial

154

Balanced binary trees for ID management and load balance in distributed hash tables  

Science Conference Proceedings (OSTI)

We present a low-cost, decentralized algorithm for ID management in distributed hash tables (DHTs) managed by a dynamic set of hosts. Each host is assigned an ID in the unit interval [0, 1). At any time, the set of IDs splits the interval into disjoint ... Keywords: DHT, ID management, P2P, binary tree, distributed hash table, load balance, peer to peer

Gurmeet Singh Manku

2004-07-01T23:59:59.000Z

155

Property:EiaUtilityId | Open Energy Information  

Open Energy Info (EERE)

EiaUtilityId EiaUtilityId Jump to: navigation, search This is a property of type String. Pages using the property "EiaUtilityId" Showing 25 pages using this property. (previous 25) (next 25) 3 3 Phases Energy Services + 21093 + 4 4-County Electric Power Assn + 6641 + A A & N Electric Coop + 84 + A & N Electric Coop (Virginia) + 84 + AEP Generating Company + 343 + AEP Texas Central Company + 3278 + AEP Texas North Company + 20404 + AES Eastern Energy LP + 134 + AGC Division of APG Inc + 261 + AP Holdings LLC + 56571 + AP Holdings LLC (New York) + 56571 + APN Starfirst, L.P. + 50153 + APN Starfirst, L.P. (Illinois) + 50153 + APN Starfirst, L.P. (Ohio) + 50153 + APN Starfirst, L.P. (Texas) + 50153 + APNA Energy + 55841 + ARCO Products Co-Watson + 867 +

156

Intergral Drive Systems AG IDS | Open Energy Information  

Open Energy Info (EERE)

Intergral Drive Systems AG IDS Intergral Drive Systems AG IDS Jump to: navigation, search Name Intergral Drive Systems AG (IDS) Place Zurich, Swaziland Zip CH-8005 Sector Wind energy Product Zurich based producer of power electronics systems for wind turbines, PV plants, and propulsion systems. Coordinates 47.37706°, 8.53955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.37706,"lon":8.53955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

157

Building Energy Software Tools Directory: ID-Spec Large  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-Spec Large ID-Spec Large ID-Spec Large is software for the electrical installation design of industrial and tertiary buildings. It helps to design a green electrical installation by enabling the user to: - Assess the impact of selecting energy efficiency solutions like power factor correction and low losses transformers in terms of cost savings - Reduce power losses and consequently carbon emissions in the electrical installation by optimizing equipment locations - Reduce investment cost while using less raw materials by optimizing length and cross-section of cables - Assess the percentage of recyclable materials for cables and busbar trunking systems. Screen Shots Keywords Electrical installation design, power losses assessment, CO2 emissions, quantity of conductors

158

JGI - DOE Sequencing Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Sequencing Projects For status information, see the Genome Projects section Organism Est. Genome Size Branchiostoma floridae (Florida lancelet) 600 Mb Chlamydomonas reinhardtii...

159

Microsoft Word - DOE-ID-INL-12-007_INL-12-033_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of 2 CX Posting No.: DOE-ID-INL-12-007 SECTION A. Project Title: Geotechnical Core Drilling for USGS 138 SECTION B. Project Description: . The U.S. Geological Survey (USGS) proposes to drill a 1,000-foot deep geotechnical corehole (USGS 138) into the eastern Snake River Plain aquifer. The location of the corehole will be about 4.0 mile(s) east of the city Howe and about 8.5 mile(s) north of the Naval Reactors Facility at the Southeast Quarter of the Southwest Quarter, Section 7, Township 5 North, Range 30 East; lattitude/longitude (WGS84) 43 46 16.1 N / 112 55 27.7W (fig. 1). The purpose of this geotechnical borehole is to obtain geologic, stratigraphic, and hydraulic data to characterize flow in the eastern Snake River Plain aquifer.

160

ORNL 2011-G00219/jcn UT-B ID 201002414  

E-Print Network (OSTI)

ORNL 2011-G00219/jcn UT-B ID 201002414 08.2011 Catalytic Conversion of Bioethanol to Hydrocarbons dilute bio-mass produced alcohols, such as those found in a biomass fermentation reactor. Conventional of traditional ethanol fermentation into fungible fuel applications Potential Applications · Hydrocarbon products

Pennycook, Steve

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

An adaptive architecture of applying vulnerability analysis to IDS alerts  

Science Conference Proceedings (OSTI)

With increasing intrusions and attacks on the Internet, there is an urgent need to develop techniques for network security. Current standalone network security products, such as the firewall systems, the Intrusion Detection System (IDS), the anti-virus ... Keywords: alert, intrusion detection, network security, predicate-based evaluation, vulnerability analysis

Xuejiao Liu; Xin Zhuang; Debao Xiao

2008-07-01T23:59:59.000Z

162

ORNL 2010-G00390/jcn UT-B ID 200802041  

E-Print Network (OSTI)

from Water Technology Summary Developing the technology to generate energy from waste and renewableORNL 2010-G00390/jcn UT-B ID 200802041 Microbial Fuel Cells Generate Energy While Clearing Biowaste materials is becoming an increasingly important priority in the United States, as energy derived from fossil

Pennycook, Steve

163

ORNL 2011-G00218/jcn UT-B ID 200701859  

E-Print Network (OSTI)

be wasted energy inside a hybrid electric vehicle engine. The invention, a mechanical flywheel coupledORNL 2011-G00218/jcn UT-B ID 200701859 07.2011 Flywheel Energy Storage Device for Hybrid to a rotor inside the engine, stores rotational energy during engine performance, subsequently feeding

Pennycook, Steve

164

ORNL 2010-G00385/jcn UT-B ID 200301297  

E-Print Network (OSTI)

billion annually in lost productivity. Waste energy from deceleration could be captured and storedORNL 2010-G00385/jcn UT-B ID 200301297 Nanostructured Carbon Shows Promise for Energy Storage energy storage demands of modern supercapacitors. Short power interruptions cost U.S. industry $80

Pennycook, Steve

165

ORNL 2010-G00405 UT-B ID 200902330  

E-Print Network (OSTI)

Industrial Effluents Technology Summary A vast amount of energy is wasted in the United States from of such previously wasted energy from relatively low temperature (ORNL 2010-G00405 UT-B ID 200902330 Novel Nanopore Membrane Technology Recovers Energy from

Pennycook, Steve

166

ID-based proxy signature scheme with message recovery  

Science Conference Proceedings (OSTI)

A proxy signature scheme, introduced by Mambo, Usuda and Okamoto, allows an entity to delegate its signing rights to another entity. Identity based public key cryptosystems are a good alternative for a certificate based public key setting, especially ... Keywords: Bilinear pairing, ID-based signature, Mobile agent, Proxy signature, Signature with message recovery

Harendra Singh; Girraj Kumar Verma

2012-01-01T23:59:59.000Z

167

UW China Hong Kong Entrance Scholarship University of Waterloo ID#  

E-Print Network (OSTI)

UW ­ China Hong Kong Entrance Scholarship Name: University of Waterloo ID#: Program Applied of Waterloo who currently lives in or who previously lived in Hong Kong or mainland China. Candidates must also intend to return to Hong Kong or China after graduation. Selection will be based on academic

Le Roy, Robert J.

168

Microsoft Word - DOE-ID-INL-11-003.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 SECTION A. Project Title: Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal SECTION B. Project Description The project will dismantle and remove...

169

Biolog(TM) ID as compared to 16S ribosomal RNA ID for environmental isolates from the deep subsurface  

SciTech Connect

The U.S. Dept of Energy (DOE) Subsurface Microbial Culture Collection (SMCC) contains nearly 10,000 strains of microorganisms isolated from terrestrial subsurface environments. Many of the aerobic, gram-negative, chemoheterotrophs isolated from the DOE Savannah River Site (SRS) have previously been identified by phylogenetic analysis of 16S ribosomal RNA (rRNA) gene nucleotide sequences. These SMCC isolates are currently being examined using Biolog GN Microplates and the Biolog Microstation System in order to gain knowledge of their metabolic capabilities and to compare Biolog IDs with 16S IDs. To accommodate the particular needs of these subsurface isolates, which are often incapable of growing under high-nutrient conditions, Biolog's recommendations for inoculating isolates into Biolog GN Microplates have been altered. The isolates are grown on low nutrient media, sodium thioglycolate (3mM) is added to the culture media to inhibit capsule formation, and a low density of bacteria is inoculated into the microplate. Using these altered inoculation criteria, 60 percent of these SMCC isolates have a Biolog genus ID that matches the 16S rRNA ID. These results indicate that the Biolog System can be a good means of identifying unusual environmental isolates, even when recommended inoculation procedures are altered to accommodate particular isolate needs.

McKinsey, P.C.

2000-05-05T23:59:59.000Z

170

DOE-ID Procurement Services � the action team  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Procurement Services � the action team DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s Procurement Services team. Rapid response Pat Alexander-Johnson (top) and Jeff Fogg (bottom) are two highly-trained and experienced contract specialists with the U.S. Department of Energy's Idaho Operations Office. Within moments of receiving its orders, the 10-member team shifted into

171

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1  

E-Print Network (OSTI)

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1 Yuanhui Zhang, Ted of Idaho, Moscow, ID 83844. Phone: 208.885.7714, fax: 208.885.7908, email: . 2Yuanhui Zhang

He, Brian

172

GRR/Section 13-ID-a - Land Use Assessment | Open Energy Information  

Open Energy Info (EERE)

ID-a - Land Use Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 13-ID-a - Land Use...

173

Microsoft Word - DOE-ID-INL-13-002 _INL-13-008_.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-13-002 If objects of potential archaeological or historical significance (e.g.,...

174

Microsoft Word - DOE-ID-INL-12-025-1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

would be recycled to the extent practicable. DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-12-025 SECTION D. Determine the...

175

Microsoft Word - DOE-ID-INL-12-007_INL-12-033_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

personal protective equipment (PPE) where practical. DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-12-007 Releasing...

176

U-063: RSA SecurID Software Token for Windows DLL Loading Error...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote...

177

DOE-ID Bi-Weekly Summary For June 15 to July 6, 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2009 6, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary will be sent to everyone on INL's regular news release distribution list every other week. To be added to this distribution list, please call Brad Bugger at (208) 526-0833. Advanced Mixed Waste Treatment Project June 15: While retrieving waste at the Advanced Mixed Waste Treatment Project, workers discovered a waste bin that was labeled as potentially containing unexploded ordnance. Previous information about the container indicated it probably did not contain unexploded ordnance, but because of the labeling, that information was not considered definitive. An exclusion zone was established around the container, using guidance from INL explosives experts. Additional information is being gathered to definitively determine the contents of the container. (EM-ID-BBWI-AMWTF-2009-0008).

178

Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray  

Office of Legacy Management (LM)

Dames & Moore Dames & Moore Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray MANAGED BY LOCKHEED MARTIN rNERGY RESEARCH CORPORATION PHONE: (423) 574-5838 FOR THE U.S. DEPARTMENT OF ENERGY FAX: (423) POST OFFICE Box 2 INTERNET: r'0 March 31, 1997 Mr. Andrew Meloy DuPont Environmental Remediation Services DuPont Chambers Works Route 130, Anti-Knocks Building G Deepwater, New Jersey 08023 Dear Mr. Meloy: Radiological Sampling Requirements for the B Ditch Remediation Project, DuPont Chamber Works Site, Deepwater, New Jersey During the week of March 10, staff members of the Oak Ridge National Laboratory, Life Sciences Division, made surface radiation measurcments along the B ditch from 6+00' to the 11+00' markers. These measurements were performed to better define the subsurface

179

Final PHP bench-scale report for the DOE-ID/SAIC sole source contract  

SciTech Connect

The Plasma Hearth Process (PHP) Technology Development Project was established to develop, test, and evaluate a new concept for treating mixed waste. The new concept uses direct current (dc) transferred-arc plasma torch technology to process mixed waste into a glass-like end-product. Under the cognizance of the US Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Focus Area (MWFA), the technology is being explored for its potential to treat mixed waste. Because it is a mature technology, well-understood and commercially available, it is expected to develop rapidly in this new application. This report summarizes the radioactive bench-scale system activities funded under PHP Sole Source Contract DE-AC07-94ID13266 through the end of the contract.

1997-04-01T23:59:59.000Z

180

Engineer II Job Number: 55533999 Req ID 54331BR  

E-Print Network (OSTI)

projects from concept through implementation. This includes project cost estimation, schedule development & overall project management. Provide process support to manufacturing facilities; trouble shoot equipment. Job Requirements: Experience in automation of pharmaceutical or food processing equipment

Heller, Barbara

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - DOE-ID-INL-11-010.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Manufacturing Complex (SMC) Line 1 Deactivation, Decontamination, and Decommissioning (DD&D) SECTION B. Project Description: This project proposes DD&D of Test Area...

182

Summary - Preliminary TRA of the Calcine Disposition Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Calcine The Id materi Dec. 2 Press additiv form w those project anticip 2012 a CD-1 a selecte Level ( assess Eleme assign prepar The as below achiev * R * Ba * C The Ele Site: I...

183

Think City Electric Vehicle Democstration Program Final Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

7182005 AWARD DE-FG26-O1ID14048 THNK city ELECTRIC VEHICLE DEMONSTRATION PROGRAM FINAL PROJECT REPORT June 2005 Ford Motor Company Sustainable Mobility Technologies 2 7182005...

184

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA SecurID Software Token for Windows DLL Loading Error 3: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

185

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

63: RSA SecurID Software Token for Windows DLL Loading Error 63: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

186

Production Cost Optimization Project 2010  

Science Conference Proceedings (OSTI)

The EPRI Production Cost Optimization project assists participating members in implementing or enhancing heat rate optimization programs to reduce production costs through sustainable performance improvements. This Technical Update summarizes the status of the project and presents results for five (5) sites that have completed initial and follow-up assessments. A PCO assessment consists of benchmarking plant thermal performance using historical plant data along with an on-site performance appraisal to id...

2010-12-22T23:59:59.000Z

187

Attenuation-based estimation of patient size for the purpose of size specific dose estimation in CT. Part II. Implementation on abdomen and thorax phantoms using cross sectional CT images and scanned projection radiograph images  

SciTech Connect

Purpose: To estimate attenuation using cross sectional CT images and scanned projection radiograph (SPR) images in a series of thorax and abdomen phantoms. Methods: Attenuation was quantified in terms of a water cylinder with cross sectional area of A{sub w} from both the CT and SPR images of abdomen and thorax phantoms, where A{sub w} is the area of a water cylinder that would absorb the same dose as the specified phantom. SPR and axial CT images were acquired using a dual-source CT scanner operated at 120 kV in single-source mode. To use the SPR image for estimating A{sub w}, the pixel values of a SPR image were calibrated to physical water attenuation using a series of water phantoms. A{sub w} and the corresponding diameter D{sub w} were calculated using the derived attenuation-based methods (from either CT or SPR image). A{sub w} was also calculated using only geometrical dimensions of the phantoms (anterior-posterior and lateral dimensions or cross sectional area). Results: For abdomen phantoms, the geometry-based and attenuation-based methods gave similar results for D{sub w}. Using only geometric parameters, an overestimation of D{sub w} ranging from 4.3% to 21.5% was found for thorax phantoms. Results for D{sub w} using the CT image and SPR based methods agreed with each other within 4% on average in both thorax and abdomen phantoms. Conclusions: Either the cross sectional CT or SPR images can be used to estimate patient attenuation in CT. Both are more accurate than use of only geometrical information for the task of quantifying patient attenuation. The SPR based method requires calibration of SPR pixel values to physical water attenuation and this calibration would be best performed by the scanner manufacturer.

Wang Jia; Christner, Jodie A.; Duan Xinhui; Leng Shuai; Yu Lifeng; McCollough, Cynthia H. [Department of Radiology, Mayo Clinic, Rochester, Minnesota 55905 (United States)

2012-11-15T23:59:59.000Z

188

Institute of Development Studies (IDS) | Open Energy Information  

Open Energy Info (EERE)

Institute of Development Studies (IDS) Institute of Development Studies (IDS) Jump to: navigation, search Logo: Institute of Development Studies Name Institute of Development Studies Address Library Road, Brighton, East Sussex Place Brighton, UK Zip BN1 9RE Number of employees 201-500 Year founded 1966 Phone number +44 (0)1273 606261 Coordinates 50.8659583°, -0.0901136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8659583,"lon":-0.0901136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

189

Microsoft Word - DOE-ID-INL-12-017.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: Engineering Research Office Building (EROB) 1E- Human System Simulation Laboratory Modifications SECTION B. Project Description: The Nuclear Science and Technology (NS&T) customer for Human Simulation Systems Lab (HSSL) has requested additional - computer lab space to support forth coming projects in yearend FY12 and projected into FY13. Project specific is the LWRS-related project for control room upgrades for a commercial client. The project will utilize the client's plant simulator installed in the HSSL on a number of touch screen panels to mimic their control room. The system displays will be used to perform a range of human factor analyses to support the client's modernization program. To support the hardware requirements for this project, large touch screen

190

U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: RSA SecurID Software Token Converter Unspecified Buffer 0: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability March 8, 2012 - 7:00am Addthis PROBLEM: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability PLATFORM: RSA SecurID Software Token Converter 2.x ABSTRACT: Successful exploitation may allow execution of arbitrary code. reference LINKS: Secunia Advisory SA48297 CVE-2012-0397 IMPACT ASSESSMENT: High Discussion: A vulnerability has been reported in RSA SecurID Software Token Converter, which can be exploited by malicious people to compromise a user's system. Impact: An unspecified error can be exploited to cause a buffer overflow. Solution: Update to version 2.6.1. Addthis Related Articles

191

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

SOLICITATIONIMODIFICATION OF CONTRACT I '. SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

192

Material Safety Data Sheet MSDS ID NO.: 0137SPE012  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Material Safety Data Sheet Material Safety Data Sheet MSDS ID NO.: 0137SPE012 Revision date: 05/25/2011 1. CHEMICAL PRODUCT AND COMPANY INFORMATION Product name: Speedway E85 Synonym: Speedway ED75/ED85; E-75; E75; E-85; E85; Ethanol/Gasoline Fuel Blend; Fuel Ethanol ED75/ED85 Chemical Family: Gasoline/Ethanol Formula: Mixture Manufacturer: Speedway LLC P.O. Box 1500 Enon, OH 45501 Other information: 419-421-3070 Emergency telephone number: 877-627-5463 2. COMPOSITION/INFORMATION ON INGREDIENTS E85 is a mixture of ethyl alcohol and gasoline that is approved for use in an automobile spark ignition engine. Can contain small amounts of dye and other additives (>0.02%) which are not considered hazardous at the concentrations used. Product information: Name CAS Number

193

IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

NLE Websites -- All DOE Office Websites (Extended Search)

6/2004 13:39 FAX 6/2004 13:39 FAX IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 26 2004 OFFICE OF AIR AND RADIATION R. Paul Detwiler, Acting Manager Carlsbad Field Office U.S. Department of Energy P.O. Box 3090 Carlsbad, NM 88221-3090 Dear Dr. Detwiler: This letter announces the U.S. Environmental Protection Agency's (EPA's) final decision to approve the Department of Energy's (DOE's) remote handled (RH) transuranic (TRU) Waste Characterization Program Implementation Plan (WCPIP), Revision aD, and the RH TRU Waste Characterization Plan for the Waste Isolation Pilot Plant (WIPP). We have detenDined that these documents provide an adeql.late general framework for the characterization ofRH waste for disposal at WIPP, while allowing flexibility for DOE to develop characterization programs

194

Automatic ID heat load generation in ANSYS code  

SciTech Connect

Detailed power density profiles are critical in the execution of a thermal analysis using a finite element (FE) code such as ANSYS. Unfortunately, as yet there is no easy way to directly input the precise power profiles into ANSYS. A straight-forward way to do this is to hand-calculate the power of each node or element and then type the data into the code. Every time a change is made to the FE model, the data must be recalculated and reentered. One way to solve this problem is to generate a set of discrete data, using another code such as PHOTON2, and curve-fit the data. Using curve-fitted formulae has several disadvantages. It is time consuming because of the need to run a second code for generation of the data, curve-fitting, and doing the data check, etc. Additionally, because there is no generality for different beamlines or different parameters, the above work must be repeated for each case. And, errors in the power profiles due to curve-fitting result in errors in the analysis. To solve the problem once and for all and with the capability to apply to any insertion device (ID), a program for ED power profile was written in ANSYS Parametric Design Language (APDL). This program is implemented as an ANSYS command with input parameters of peak magnetic field, deflection parameter, length of ID, and distance from the source. Once the command is issued, all the heat load will be automatically generated by the code.

Wang, Zhibi

1992-04-30T23:59:59.000Z

195

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

196

File:03-ID-d - Land Use Permit.pdf | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit.pdf d - Land Use Permit.pdf Jump to: navigation, search File File history File usage Metadata File:03-ID-d - Land Use Permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 28 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:56, 22 August 2013 Thumbnail for version as of 13:56, 22 August 2013 1,275 × 1,650 (28 KB) Abergfel (Talk | contribs) 13:47, 22 August 2013 Thumbnail for version as of 13:47, 22 August 2013 1,275 × 1,650 (27 KB) Abergfel (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

197

Idaho National Laboratory Supervisory Control and Data Acquisition Intrusion Detection System (SCADA IDS)  

SciTech Connect

Current Intrusion Detection System (IDS) technology is not suited to be widely deployed inside a Supervisory, Control and Data Acquisition (SCADA) environment. Anomaly- and signature-based IDS technologies have developed methods to cover information technology-based networks activity and protocols effectively. However, these IDS technologies do not include the fine protocol granularity required to ensure network security inside an environment with weak protocols lacking authentication and encryption. By implementing a more specific and more intelligent packet inspection mechanism, tailored traffic flow analysis, and unique packet tampering detection, IDS technology developed specifically for SCADA environments can be deployed with confidence in detecting malicious activity.

Jared Verba; Michael Milvich

2008-05-01T23:59:59.000Z

198

A Role for Id-1 in the Aggressive Phenotype and Steroid ...  

Desprez, P. Y., Hara E., Bissell, M. J., and Campisi, J. Suppression of mammary epithelial cell differentiation by the helix-loop-helix protein Id-1. Mol. Cell.

199

Size Effects  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... An Explanation of the Power-Exponent in the Size Effect on Strength in ... in terms of the Taylor-type resistance in the dislocation network in the specimen. ... hysteresis and loss in pseudoelasticity with decrease in sample size.

200

Microsoft Word - DOE-ID-INL-13-012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

12 12 SECTION A. Project Title: Water Security Test Bed (WSTB) SECTION B. Project Description: This project was extensively described in Environmental Checklists (ECs) Idaho National Laboratory (INL)-13-014 (Overarching [OA] 5) and INL-13-014 Revision (R) 1 (OA 5). Upon review, it was determined that additional planning and detail was required to fully describe the project and associated activities. Both INL-13-014 and R1 to that EC are canceled; this EC will replace them. Future revisions may address additional project details regarding design, construction, and operational details and limitations as they become known through the project planning process. Background Since its inception, the Environmental Protection Agency's (EPA) Homeland Security Research Program (Sponsor) has been providing

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft Word - DOE-ID-INL-13-026.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

would occur during removal activities. Project personnel would work with Waste Generator Services (WGS) to properly characterize, store, and dispose all waste according to...

202

Microsoft Word - DOE-ID-INL-13-016.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

would be disposed of in appropriate recycling containers at INL facilities or in the INL Landfill Complex through Waste Generator Services (WGS). Project personnel would...

203

Microsoft Word - DOE-ID-INL-13-004.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

or Waste Handling and Transportation: Project personnel would work with Waste Generator Services (WGS) to properly package and transport regulated, hazardous or radioactive...

204

Exponential Size Distributions for Snow  

Science Conference Proceedings (OSTI)

Using airborne data from several recent field projects, the authors have taken another look at the properties of exponential ice particle size distributions (PSDs) when the PSDs are broad. Two primary questions are addressed: for what ranges of ...

Andrew J. Heymsfield; Paul Field; Aaron Bansemer

2008-12-01T23:59:59.000Z

205

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-MM-1152A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

152A 152A Title: BM Brine Disposal Pump Replacement (GFE) Description: Subcontractor shall provide all labor, materials, tools, equipment, supervision, and transportation required to supply two pumps to replace the existing Bryan Mound brine disposal pumps, BMP-115 and BMP-116. Task include providing two completely assembled brine disposal pumps with base and motor as government furnished equipment (GFE). Installation of the pumps will be performed by others. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

206

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-10-074  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Title: BM Replace Interior and Exterior Entryway to Building 201 Description: Subcontractor shall provide all materials, equipment, tools, transportation, supervision, and labor needed to replace the interior and exterior entryway to BM Building 201. Tasks include replacement of the entryways with new glass, framing, doors, door hardware, closing devices, glass tinting, and signage. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

207

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-09-080  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Door Repairs Door Repairs Description: Subcontractor shall provide all materials, equipment, tools, transportation, supervision, labor, mobile lifting equipment, and rigging needed to repair the doors on BH Buildings 802 and 812. Tasks include replacing one damaged coiling steel door, one damaged pedestrian door and damaged building components on BH Building 802; and replacing two corroded pedestrian doors, their frames and hardware, and damaged building trim components on BH Building 812. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

208

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-767A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A A Title: Replace Brine Disposal System Header to WH Brine Tanks, GFE Description: Manufacturer shall provide the piping and fittings associated with the replacement of the brine disposal system header to the WH Brine Tanks as Government Furnished Equipment (GFE). The manufacturer shall load all materials onto transports supplied by others. Installation will be performed by others under BM-MM-767. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

209

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-MM-658  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

658 658 Title: Rework BH 36" Crude Oil Pipeline Mainline Valves Description: Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to rework the BH 36" crude oil pipeline mainline valves. Tasks include excavation of the valve stations, installation of vent valves, and rework of the crude oil pipeline mainline valves. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

210

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-816  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

816 816 Title: WH Building 301 AHU-1 HVAC Replacement Description: Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the WH Building 301 Air Handling Unit (AHU-1) and its associated air cooled condensing unit at the West Hackberry SPR site for the existing Heating, Ventilation, and Air Conditioning (HVAC) unit. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

211

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-09-111  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 11 Title: Provide Clear Zone Around Bryan Mound Description: Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, labor, supervision, and service required to machine clear standing vegetation at the Bryan Mound site. The total area to be cleared does not exceed 132 acres. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

212

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-OM-1046  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46 46 Title: Replacement Anode Bed on WH 42-inch Crude Oil Pipeline at Gum Cove Road Description: Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required for the installation of a new deep anode ground bed system on the WH 42-inch Crude Oil Pipeline at Gum Cove Road. Work consists of drilling operations, resistance log of well, component termination, and site cleanup. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

213

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-09-130  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

130 130 Title: Replacement of BH Deep Anode Ground Bed Site for Cavern 114 Description: Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required for the installation of a deep anode ground bed site at BM Cavern 114. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

214

Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Nation in Clean Energy Deployment the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable energy technology solutions. Disaster Recovery DOE and NREL technical experts have helped communities like Greensburg, Kansas, and New Orleans, Louisiana, successfully rebuild following disaster by providing assistance with sustainable community planning, forward-thinking policy development, and

215

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-MM-785  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85 85 Title: Install Temperature Monitoring on BH 36 inch Crude Oil Pipeline Description: Subcontractor shall shall provide all labor, materials, tools, equipment, and supervision required to install temperature monitoring instrumentation on the BH 36 inch crude oil pipeline at valve stations 8PL00-MOV-02, 8PL00-MOV-04, 8PL00-MOV-05, and 8PL00- MOV-15. Tasks include installation of thermocouples, transmitters, and cables. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

216

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-OM-1006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OM-1006 OM-1006 Title: Video Inspection of BM 36-inch Raw Water Pipeline Description: Subcontractor shall shall provide all supervision, labor, materials, tools, supplies, transportation, facilities, equipment, and services to perform the work in connection with the piping inspection and video analysis as required for the BM 36-inch Raw Water pipeline from the RWIS pig receiver to the High Pressure Pump Pad pig launcher. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

217

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-MM-660  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

660 660 Title: Rework BM 30" Crude Oil Pipeline Mainline Valves Description: Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to rework the BM 30" crude oil pipeline mainline valves. Tasks include excavation of the valve stations, installation of vent valves, and rework of the crude oil pipeline mainline valves. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

218

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-09-119  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-119 9-119 Title: Replace Fiberglass Covers/Troughs on Traveling Screens at WH RWIS Description: Subcontractor shall replace all fiberglass covers and troughs on the traveling screens at the West Hackberry Raw Water Intake Structure. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

219

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-OM-1065B  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B B Title: Remanufacture, Transport, and Install BHTX-29 Transformer Description: Subcontractor shall provide all labor, supervision, tools, equipment, and transportation required to remanufacture (repair), transport, install, test, and pre-commission the BHTX- 29 transformer. Work will be performed at the subcontractor's off-site facility. Proper lift and transportation equipment will be required to load and transport the BHTX-29 transformer from the off-site location to the Big Hill site. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has

220

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-09-086  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-086 09-086 Title: Replace WH Radio Tower Description: Subcontractor shall provide all labor, tools, equipment, materials, consumables, services, insurance, transportation. storage, and supervision necessary to design and install a new guyed radio tower, foundations, antenna wiring, lighting, grounding to replace the existing WH radio tower and associated equipment. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and 8 of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-1022  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1022 1022 Title: Access to Remote Valve Station WH-2 Description: Subcontractor shall furnish all labor, materials, equipment, tools, transportation, supervision, mobil lifting equipment, and rigging required to repair access to remopte valve station WH-2. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

222

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-10-077A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7A 7A Title: Refurbish BC Static Mixer GFE Description: Subcontractor shall provide all supervision, transportation, labor, materials, and equipment to pickup, refurbish, install new baffles, and deliver an axial flow type mixer for crude oil service to the Bayou Choctaw SPR site. Government will furnish the old static mixer complete with flanges. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

223

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-MM-761  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Replace BH RWIS Oil Water Separator Tank with Concrete Tank Description: Subcontractor shall furnish all labor, tools, materials, equipment and supervision required to replace the BH RWIS oil water separator tank with a new concrete tank. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

224

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-OM-1065A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A A Title: Transport and Perform TD&I on BHTX-29 Transformer Description: Subcontractor shall provide all labor, supervision, tools, lifting and transportation services required to transport the BHTX-29 transformer to an offsite facility to perform tear down and inspection (TD&I) and testing. Proper lift and transportation equipment will be required to load and transport the BHTX-29 transformer from the Big Hill site. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

225

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-10-112  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

112 112 Title: Remove Abandoned BC Timber Bridge Over North/South Canal Description: Subcontractor shall furnish all materials, labor, equipment, supplies, transportation, facilities, supervision, and services required to remove and dispose of the abandoned BC Timber Bridge over the North/South Canal. Tasks also include installation of erosion protection/bank stabilization as required. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

226

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-10-004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 04 Title: WH Annual PSV Testing Description: Subcontractor shall provide a mobile van with all labor, material, equipment, transportation, and supervision required to perform annual testing of all pressure safety valves at WH. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

227

Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)  

NLE Websites -- All DOE Office Websites (Extended Search)

Leading the Nation in Clean Energy Deployment Leading the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable energy technology solutions. Disaster Recovery DOE and NREL technical experts have helped communities like Greensburg, Kansas, and New Orleans, Louisiana, successfully rebuild following disaster by providing assistance with sustainable community planning, forward-thinking policy development, and

228

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-MM-789  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

789 789 Title: Replace BC Warehouse Firewater Piping Description: Subcontractor shall provide design, plans, materials, labor and supervision required to replace the dry automatic sprinkler system found in the BC Property Warehouse (Building 411). Tasks include installation and hydrostatic testing of the new sprinkler system. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

229

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-OM-1081  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Title: Dredging of the WH Raw Water Intake Structure Description: Subcontractor shall shall provide all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to perform the work associated with the dredging of the WH Raw Water Intake Structure approach channel of mud, silt, and debris, to include cleaning the pump intake sump. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

230

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-046-010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46-010 46-010 Title: WHT-1 and WHT-10 Liner Removal/Reline Description: Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, utilities, labor, coating inspectors, and supervision required to remove and replace the liners in tanks WHT-1 and WHT-10. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

231

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-10-003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03 03 Title: Replace BM Oil/Water Separators Description: Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to replace the BM Oil/Water Separators. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

232

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-11-057  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-057 1-057 Title: Clean, Seal, and Paint WH Buildings RW MCC 392, Substation 390 and MCC 317 Description: Subcontractor shall furnish all materials, tools, equipment, transportation, supplies, facilities, utilities, labor and supervision required to pressure wash, seal, and paint the WH buildings RW MCC 392, Substation 390 and MCC 317. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

233

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-10-071  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Title: Replace BC Timber Pile Pipe Supports Description: Subcontractor shall provide all materials, equipment, tools, transportation, supervision, labor, mobile lifting equipment, and rigging needed to replace the timber piles and cross beams which support aboveground steel pipelines at BC. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D;

234

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-10-028  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-028 10-028 Title: Re-seal Polyurethane Overcoat on BH Substation Relay Building 814 Description: Subcontractor shall furnish all services, tools, equipment, supplies, transportation, facilities, labor, supervision, and materials needed to repair, clean, and re-coat the existing Polyurethane Foam Roofing System on the BH Substation relay Building 814. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

235

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-OM-1012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OM-1012 OM-1012 Title: BH Raw Water Brine Header Piping Inspection Description: Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to locate, excavate, and inspect two locations of the BH Raw Water/Brine Site Piping Header. Inspections will be performed by Automated Ultrasonic Testing. All work will be done on Government property. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart 0 are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

236

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-1000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MM-1000 MM-1000 Title: Inspection and Repair of WH-SUN 42-inch Crude Oil Pipeline Description: Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to locate, excavate, and inspect an internal corrosion anomaly at two locations on the WH to SUN Terminal 42-inch crude oil pipeline. Inspections will be performed by Automated Ultrasonic Testing. Repairs shall be performed based on the inspection results. All work will be performed on the DOE pipeline right-of-way. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

237

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-MM-772C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

772C 772C Title: Tear Down, Inspect and Repair BC Brine Filters at BOW Pad 1 Description: Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to pickup, inspect, refurbish, install new closures, blast and paint, and deliver three filter pod vessels for brine disposal service at BC. The existing filter pods will be disconnected from piping by OM personnel. Site personnel and equipment will be available for loading/unloading the filter pods onto the subcontractor's transport vehicle during pickup and delivery. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart 0 are classes of actions that DOE has

238

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-DS-171  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DS-171 DS-171 Title: Use RW Surge Line to BH Anhydrite Pond for RWIS Recycle Description: DOE M&O Contractor will cap the existing recycle line at the BH raw water intake structure for repair work and install a valve in place of the existing surge relief valve to serve as a recycle valve to control flow from the BH raw water intake pumps. The raw water surge line will discharge to the BH anhydrite pond while repairs are being made to the recycle line. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart 0 are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

239

Last Revision Date: 8/16/2010 Last Merged Filing ID:  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision Date: 8/16/2010 Last Merged Filing ID: Revision Date: 8/16/2010 Last Merged Filing ID: Tariffs, Rate Schedules, and Other Tariff Documents Southwestern Power Administration Tariffs, Rate Schedules, and Other Tariff Documents Document Generated On: 10/1/2010 Contents TABLE OF CONTENTS ....................................................................................................................................1 PREAMBLE: AUTHORITIES AND OBLIGATIONS .............................................................................................1

240

SAT(ID): satisfiability of propositional logic extended with inductive definitions  

Science Conference Proceedings (OSTI)

We investigate the satisfiability problem, SAT(ID), of an extension of propositional logic with inductive definitions. We demonstrate how to extend existing SAT solvers to become SAT(ID) solvers, and provide an implementation on top of MiniSat. We also ...

Maarten Marin; Johan Wittocx; Marc Denecker; Maurice Bruynooghe

2008-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Microsoft Word - DOE-ID-INL-11-004.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

04 04 SECTION A. Project Title: ATR Canal AFIP-7 Channel Gap Probe Installation Project SECTION B. Project Description: The location for the proposed project is the Advanced Test Reactor (ATR) at the ATR Complex, located at the Idaho National Laboratory (INL). This project involves the following primary efforts: * Installation of the channel gap probe instrument into the East end of the ATR canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables * Fabrication and installation of a new skimmer bracket - the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical removal and reconfiguration of skimmer bracket in canal area

242

Microsoft Word - DOE-ID-INL-11-004.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 04 SECTION A. Project Title: ATR Canal AFIP-7 Channel Gap Probe Installation Project SECTION B. Project Description: The location for the proposed project is the Advanced Test Reactor (ATR) at the ATR Complex, located at the Idaho National Laboratory (INL). This project involves the following primary efforts: * Installation of the channel gap probe instrument into the East end of the ATR canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables * Fabrication and installation of a new skimmer bracket - the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical removal and reconfiguration of skimmer bracket in canal area

243

T-642: RSA SecurID update to Customers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: RSA SecurID update to Customers 2: RSA SecurID update to Customers T-642: RSA SecurID update to Customers June 9, 2011 - 12:45am Addthis PROBLEM: Certain characteristics of the attack on RSA indicated that the perpetrator's most likely motive was to obtain an element of security information that could be used to target defense secrets and related IP, rather than financial gain, PII, or public embarrassment. PLATFORM: RSA SecurID implementations ABSTRACT: RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products. reference LINKS: Open Letter to RSA Customers (update) CVE-2011-0322 RSA Fraud Resource Center RSA Security Practice DOE-CIRC T-640: RSA Access Manager Server CVE-2011-0322 Update

244

GRR/Section 3-ID-d - Land Use Permit | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit d - Land Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-d - Land Use Permit 03-ID-d - Land Use Permit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Triggers None specified Click "Edit With Form" above to add content 03-ID-d - Land Use Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands issues Land Use Permits for non-invasive exploration on a case by case basis. 3-ID-d.1 to 3-ID-d.2 - Will Non-Invasive Exploration Be Preformed on State Lands? A Land Use Permit is required to preform non-invasive exploration on state

245

Finding Utility Companies Under a Given Utility ID | OpenEI Community  

Open Energy Info (EERE)

Finding Utility Companies Under a Given Utility ID Finding Utility Companies Under a Given Utility ID Home > Groups > Developer Jayhuggins's picture Submitted by Jayhuggins(15) Member 22 June, 2012 - 09:39 Utility+Utility Access Map Here's a quick way to find all the utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: [[Category:Utility Companies]][[EiaUtilityId::15248]] substituting your utility id of interest for 15248, and click "Find results". Groups: Developer Login to post comments Jayhuggins's blog Latest blog posts Rmckeel The utility rate database version 1 API is now deprecated Posted: 6 Sep 2013 - 14:00 by Rmckeel Jweers New Robust References! Posted: 7 Aug 2013 - 18:23 by Jweers 1 comment(s) 1 of 10 ›› Groups Menu You must login in order to post into this group.

246

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I '. I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

247

Indonesia-World Bank Climate Projects | Open Energy Information  

Open Energy Info (EERE)

World Bank Climate Projects World Bank Climate Projects Agency/Company /Organization World Bank Sector Energy, Land Focus Area Energy Efficiency, Renewable Energy, Geothermal, Forestry Topics Background analysis Country Indonesia South-Eastern Asia References World Bank project database[1] Contents 1 World Bank Active Climate Projects in Indonesia 1.1 Pontianak - LFG Recovery Project, Carbon Offset 1.2 Makassar - TPA Tamangapa Landfill Methane Collection and Flaring 1.3 Geothermal Power Generation Development 1.4 Geothermal Clean Energy Investment Project 1.5 ID-PCF-Indonesia Lahendong Geothermal Project 1.6 ID-PCF-Indocement Cement, Carbon Offset 1.7 Bekasi Landfill Gas Flaring, Carbon Offset 2 References World Bank Active Climate Projects in Indonesia Pontianak - LFG Recovery Project, Carbon Offset

248

Microsoft Word - DOE-ID-INL-13-014.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Iona Relay Station Maintenance SECTION B. Project Description: This project would periodically perform maintenance related activities in and around an approximate 15 acre area at the Iona Hill Relay Station. Activities would include: maintenance/testing of the emergency generator, facility grounds and road surface repair and upkeep (e.g., grading, snow removal, resurfacing, weed control), building and structure maintenance/repair (e.g., painting, insect control, structural inspection and repair as necessary). Specifically, fire breaks would be established around buildings and structures by removing vegetation and applying sterilant for distances of approximately 10 - 50 feet from the area to be protected. Certain structures

249

Microsoft Word - DOE-ID-INL-13-014.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 SECTION A. Project Title: Iona Relay Station Maintenance SECTION B. Project Description: This project would periodically perform maintenance related activities in and around an approximate 15 acre area at the Iona Hill Relay Station. Activities would include: maintenance/testing of the emergency generator, facility grounds and road surface repair and upkeep (e.g., grading, snow removal, resurfacing, weed control), building and structure maintenance/repair (e.g., painting, insect control, structural inspection and repair as necessary). Specifically, fire breaks would be established around buildings and structures by removing vegetation and applying sterilant for distances of approximately 10 - 50 feet from the area to be protected. Certain structures

250

Advanced Vehicle Testing Activity: Full-Size Electric Vehicle...  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects to someone by E-mail Share Advanced Vehicle Testing Activity: Full-Size Electric Vehicle Special Projects on Facebook Tweet about Advanced Vehicle Testing Activity:...

251

Microsoft Word - DOE-ID-INL-13-013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement SECTION B. Project Description: The purpose of this project is to automate the ATR Primary Coolant Leak Rate Determination System by replacing existing flow transmitters and installing new transmitters to provide a redundant signal. This project is part of an overall effort to implement Leak Before Break (LBB) at the ATR, and will improve accuracy and timeliness, provide consistency with licensed reactor leak monitoring requirements, and will reduce operator burden. Essentially, the proposed action is to ensure the system works properly, meets its intended function, and to improve system reliability. The instrumentation associated with the leak rate determination system is located in the demineralizer corridor and the demineralizer

252

Microsoft Word - DOE-ID-INL-12-011.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System SECTION B. Project Description: The purpose of this project is to provide a monorail system to aid maintenance personnel in the hoisting and transporting of the Advanced Test Reactor (ATR) Primary Coolant System (PCS) Safety Relief Valves, SF-A-1-71 and SF-A-1-72, in support of the 2 year replacement. The monorail system would consist of two independent monorail assemblies installed in the concrete ceiling of the ATR Nozzle Trench Area. The proposed monorail system would provide the ability to hoist and transport the ATR PCS Relief Valves, SF-A-1-71 and SF-A-1-72, from their installed location on the north side of the Nozzle Trench Area to areas free of floor obstructions. This project would require two separate monorail systems due to several ceiling

253

Microsoft Word - DOE-ID-10-004.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: E-85 Fueling Systems for AMWTP and INTEC SECTION B. Project Description This project consists of installing two E-85 fueling systems (85 % ethanol and 15% petroleum based fuel) for fueling fleet vehicles. One system will be located at the Advanced Mixed Waste Treatment Project and the other at the Idaho Nuclear Technology Center. The two above ground, E85 compatible, double wall carbon steel, skid-mounted tanks have a capacity of 12,000 gallons each. The tanks will be constructed offsite to UL standard 142 and 2080 and only require an onsite aggregate base for leveling, 22 post holes each for bollards (6"X24"), and a utility trench each for the electrical service line and data line to an onsite power pole (maximum of

254

Microsoft Word - DOE-ID-INL-11-001.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 SECTION A. Project Title: Hex Block Shipment Project SECTION B. Project Description. This project involves the shipment of two irradiated stainless steel hex blocks presently located at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) to a Westinghouse facility located in Pittsburgh, Pennsylvania to support Research and Development (R&D) activities. This R&D work will be performed by a private contractor and will involve the use of ultrasonic equipment to determine the extent of swelling in irradiated structural stainless steel. Thick sections of irradiated stainless steel (as contained in the hex blocks) are needed to verify operation of the ultrasonic measuring equipment when applied to the internals of a power water reactor

255

Microsoft Word - DOE-ID-INL-12-011.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System SECTION B. Project Description: The purpose of this project is to provide a monorail system to aid maintenance personnel in the hoisting and transporting of the Advanced Test Reactor (ATR) Primary Coolant System (PCS) Safety Relief Valves, SF-A-1-71 and SF-A-1-72, in support of the 2 year replacement. The monorail system would consist of two independent monorail assemblies installed in the concrete ceiling of the ATR Nozzle Trench Area. The proposed monorail system would provide the ability to hoist and transport the ATR PCS Relief Valves, SF-A-1-71 and SF-A-1-72, from their installed location on the north side of the Nozzle Trench Area to areas free of floor obstructions. This project would require two separate monorail systems due to several ceiling

256

Microsoft Word - DOE-ID-INL-13-013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement SECTION B. Project Description: The purpose of this project is to automate the ATR Primary Coolant Leak Rate Determination System by replacing existing flow transmitters and installing new transmitters to provide a redundant signal. This project is part of an overall effort to implement Leak Before Break (LBB) at the ATR, and will improve accuracy and timeliness, provide consistency with licensed reactor leak monitoring requirements, and will reduce operator burden. Essentially, the proposed action is to ensure the system works properly, meets its intended function, and to improve system reliability. The instrumentation associated with the leak rate determination system is located in the demineralizer corridor and the demineralizer

257

Microsoft Word - DOE-ID-INL-13-004.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: High Density Fuel Material for Light Water Reactors (LWRs) SECTION B. Project Description This project proposes to install glove boxes, laboratory equipment and laboratory hoods in the east wing of the Experimental Fuels Facility (EFF), building 794, at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The building was previously known as the Contaminated Equipment Storage Building (CESB). The purpose of this project is to support a high density fuel material development activity for LWRs. The proposed action transfers process equipment from the Idaho Nuclear Technology and Engineering Center (INTEC) Chemical Processing Plant (CPP)-1634 to EFF. Activities at CPP-1634 were approved in environmental

258

Microsoft Word - DOE-ID-INL-10-021.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Low-Level Waste Disposal SECTION B. Project Description: The proposed action would conduct geotechnical investigations at two 4-6 acre candidate sites for a Remote-Handled...

259

Active DOE Technical Standards Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Active) Active) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Status Date P1073- 2003REV Configuration Management DOE-STD-1073-2003REV James O'Brien (HS-33) Mary Frances Haughey (301) 903-2867 mary.haughey@hq.doe.gov Initiated - In Development 01/24/2013 P1095- 2011REV Department of Energy Laboratory Accreditation Program External Dosimatry Technical Standard

260

Microsoft Word - DOE-ID-INL-12-026.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DIRECTIONS: Responsible Managers, Program Environmental Lead (PEL), and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (see Environmental Points of Contact, NEPA/Environmental Checklist Support at http://webfiles/es&h/es&s/contacts.pdf). Enter a Valid Charge Number: 101653B80 SECTION A. Project Title: Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 SECTION B. Project Description The purpose of this project is to ensure the concrete masonry unit (CMU) separating the control room and the Reactor Data Acquisition System (RDAS) room located at TRA-670 meets the PC-4 seismic standard. The following is the summary of the overall upgrade modification approach for the 4" CMU.

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Microsoft Word - DOE-ID-INL-12-026.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DIRECTIONS: Responsible Managers, Program Environmental Lead (PEL), and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (see Environmental Points of Contact, NEPA/Environmental Checklist Support at http://webfiles/es&h/es&s/contacts.pdf). Enter a Valid Charge Number: 101653B80 SECTION A. Project Title: Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 SECTION B. Project Description The purpose of this project is to ensure the concrete masonry unit (CMU) separating the control room and the Reactor Data Acquisition System (RDAS) room located at TRA-670 meets the PC-4 seismic standard. The following is the summary of the overall upgrade modification approach for the 4" CMU.

262

Microsoft Word - DOE-ID-INL-12-014.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: M-10 Emergency Pump Backup Power SECTION B. Project Description: The proposed action would add a manually controlled electric power transfer switch and power inlet receptacle to the M-10 emergency coolant pump electrical power feed to power the M-10 pump to address safety issues that could arise with a complete loss of power on the Advanced Test Reactor (ATR)-670-E-15 diesel/commercial bus. The transfer switch and receptacle would be located outside the west wall of the ATR building (Test Reactor Area [TRA]-670) so a portable diesel generator, procured by the project, could be used to power the M-10 pump in the event of a power loss. New conduit would be routed as needed to accommodate the insertion of the

263

Microsoft Word - DOE-ID-INL-13-015.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) SECTION B. Project Description: The proposed project will relocate Homeland Security personnel who currently reside at TREAT to CITRC. The scope of this environmental checklist is only for the purchase and installation of three modular trailers. Three modular buildings are to be purchased by Battelle Energy Alliance, LLC (BEA) and will be installed by Subcontract personnel. One trailer will consist of two modular units connected together and will be used as a field station office for Homeland Security personnel. The other modular building will be a restroom trailer. These trailers will be located where Power Burst Facility (PBF)-641

264

Microsoft Word - DOE-ID-INL-13-021.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Description: Decommissioning of Shallow Injection Wells (SIW) (13-Test Reactor Area [TRA], 14-TRA, 21- TRA and 26-TRA) at the Advanced Test Reactor (ATR) Complex SECTION B. Project Description: This project will involve the decommissioning of the following Shallow Injection Wells (SIWs) at the Advanced Test Reactor (ATR) Complex: 13-TRA (Idaho Department of Water Resources [IDWR] Permit Number 34X0001020) located near the northeast corner of building TRA-614, 14-TRA (IDWR Permit Number 34X0001021) located near the northwest corner of building TRA-622, 21-TRA (IDWR Permit Number 34X0001093) located near the northwest corner of building TRA-627, and 26-TRA (IDWR Permit Number 34X0001098) located on the east side of building TRA-638.

265

Microsoft Word - DOE-ID-INL-12-019.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 SECTION A. Project Title: INL Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed project will install a new air conditioning unit in the INL Administration Building room 112. The new air conditioning system will handle the equipment heat loads within this room. Room 112 is an unclassified telephone room that is not normally occupied. This room has one supply air diffuser and one return air grille that are insufficient for proper ambient air temperatures. It is assumed that no future addition of equipment loads will take place. A 3-ton Liebert DataMate air conditioner (inside and outside units) will be installed, which should be sufficient to cool the room. Liebert units are high quality data center air conditioners that are designed

266

Microsoft Word - DOE-ID-INL-10-019.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 SECTION A. Project Title: Idaho National Laboratory (INL) - United States Geological Survey (USGS) Geotechnical Drilling Program (USGS 136) SECTION B. Project Description: The USGS proposes to drill a 1,000-foot deep geotechnical corehole (USGS 136) into the eastern Snake River Plain aquifer. The location of the corehole will be approximately 0.5 mile(s) southwest of the Advanced Test Reactor (ATR) Complex at the Idaho National Laboratoy. The purpose of this geotechnical corehole is to obtain geologic, stratigraphic, and hydraulic data to characterize flow in the eastern Snake River Plain aquifer. The project will need to extend a road to the new well location making use of the existing road to well TRA-07. Potential impact to cultural and biological resources will be minimized by making use of existing INL roads wherever possible. Any soil disturbance would

267

Microsoft Word - DOE-ID-INL-12-014.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 SECTION A. Project Title: M-10 Emergency Pump Backup Power SECTION B. Project Description: The proposed action would add a manually controlled electric power transfer switch and power inlet receptacle to the M-10 emergency coolant pump electrical power feed to power the M-10 pump to address safety issues that could arise with a complete loss of power on the Advanced Test Reactor (ATR)-670-E-15 diesel/commercial bus. The transfer switch and receptacle would be located outside the west wall of the ATR building (Test Reactor Area [TRA]-670) so a portable diesel generator, procured by the project, could be used to power the M-10 pump in the event of a power loss. New conduit would be routed as needed to accommodate the insertion of the

268

Microsoft Word - DOE-ID-INL-12-010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation SECTION B. Project Description: The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment. The 5 ton cooling unit and drycooler will be installed on the roof of the IORC and in room E-6. Installation will also include running piping (propylene glycol return, condensate) and electrical. Relocation of the UPS and servers will require some new conduit, pull boxes, wiring and racks. Estimated Start Date: May, 2012

269

Microsoft Word - DOE-ID-INL-13-015.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) SECTION B. Project Description: The proposed project will relocate Homeland Security personnel who currently reside at TREAT to CITRC. The scope of this environmental checklist is only for the purchase and installation of three modular trailers. Three modular buildings are to be purchased by Battelle Energy Alliance, LLC (BEA) and will be installed by Subcontract personnel. One trailer will consist of two modular units connected together and will be used as a field station office for Homeland Security personnel. The other modular building will be a restroom trailer. These trailers will be located where Power Burst Facility (PBF)-641

270

Microsoft Word - DOE-ID-INL-11-012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 SECTION A. Project Title: ATR Primary Heat Exchanger Seismic Capacity Project SECTION B. Project Description: Modification and upgrade of the seismic support structures for the five primary heat exchangers within ATR (670-M-2, 3, 4, 5 and 85) is needed to meet new PC-4 seismic criteria. The scope of the design is to replace the upper tie-rod assemblies and wall mounted anchor plates (the existing belly band on each heat exchanger will remain unchanged). The existing concrete structures that support the lower portion of each heat exchanger will be externally reinforced with new steel supports anchored and welded in place (the existing concrete support structures will remain unchanged). Before this seismic support modification can occur, a piping modification needs to be performed on the primary heat exchanger

271

Microsoft Word - DOE-ID-INL-11-003.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SECTION A. Project Title: Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal SECTION B. Project Description The project will dismantle and remove the Specific Manufacturing Capability (SMC) refuse incinerator, the eighteen foot stack, and the associated propane tank system. All propane will be removed from the tank prior to physical removal. The incinerator is located on a cement slab approximately 20 meters northeast of building TAN-681 and is within the fenced perimeter of the SMC facility. The SMC incinerator was permitted for operation by the State of Idaho in March 1986 and continued operations until 2010. The purpose of the incinerator was to destroy classified cold waste such as paper, typewriter ribbons, and computer disks. With advances

272

Microsoft Word - DOE-ID-INL-13-018.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: ZIRCEX Nuclear Fuel Dissolution Testing SECTION B. Project Description: Battelle Energy Alliance (BEA) has a Department of Energy-Nuclear Energy (DOE-NE) project to perform proof-of-concept testing for a nuclear fuel processing method on naval nuclear fuel. A non-radioactive portion of the test will be performed at Central Facilities Area (CFA)-625. To conduct the portion of testing with irradiated nuclear fuel, a hot cell facility at Idaho Nuclear Technology and Engineering Center (INTEC) that is owned by DOE- Environmental Management (EM) and operated by CH2M-WG Idaho, LLC (CWI) will be used. BEA will conduct the required tests in the Remote Analytical Laboratory (RAL) facility (Chemical Process Plant [CPP]-684) as a tenant

273

Microsoft Word - DOE-ID-INL-12-019.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 SECTION A. Project Title: INL Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed project will install a new air conditioning unit in the INL Administration Building room 112. The new air conditioning system will handle the equipment heat loads within this room. Room 112 is an unclassified telephone room that is not normally occupied. This room has one supply air diffuser and one return air grille that are insufficient for proper ambient air temperatures. It is assumed that no future addition of equipment loads will take place. A 3-ton Liebert DataMate air conditioner (inside and outside units) will be installed, which should be sufficient to cool the room. Liebert units are high quality data center air conditioners that are designed

274

Microsoft Word - DOE-ID-INL-13-018.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: ZIRCEX Nuclear Fuel Dissolution Testing SECTION B. Project Description: Battelle Energy Alliance (BEA) has a Department of Energy-Nuclear Energy (DOE-NE) project to perform proof-of-concept testing for a nuclear fuel processing method on naval nuclear fuel. A non-radioactive portion of the test will be performed at Central Facilities Area (CFA)-625. To conduct the portion of testing with irradiated nuclear fuel, a hot cell facility at Idaho Nuclear Technology and Engineering Center (INTEC) that is owned by DOE- Environmental Management (EM) and operated by CH2M-WG Idaho, LLC (CWI) will be used. BEA will conduct the required tests in the Remote Analytical Laboratory (RAL) facility (Chemical Process Plant [CPP]-684) as a tenant

275

Microsoft Word - DOE-ID-INL-12-010.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 SECTION A. Project Title: Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation SECTION B. Project Description: The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment. The 5 ton cooling unit and drycooler will be installed on the roof of the IORC and in room E-6. Installation will also include running piping (propylene glycol return, condensate) and electrical. Relocation of the UPS and servers will require some new conduit, pull boxes, wiring and racks. Estimated Start Date: May, 2012

276

Microsoft Word - DOE-ID-INL-12-002.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 SECTION A. Project Title: Underground Storage Tank (UST) Steel Line Replacements SECTION B. Project Description: The Idaho Department of Environmental Quality (DEQ) performed an inspection of Idaho National Laboratory's (INL's) USTs in September of 2011. Inspection results indicated field violations for failing to install and maintain cathodic protection systems for steel lines associated with seven underground storage tanks. DEQ did not accept the INL's "corrosion expert" determination that the installation sites soils were not corrosive enough to cause a release due to corrosion during the lines operating life. This determination was not accepted because the INL corrosion experts did not have specific National Association of Corrosion Engineers (NACE)

277

Microsoft Word - DOE-ID-INL-13-027.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

27 27 SECTION A. Project Title: Excess Facilities Deactivation and Demolition SECTION B. Project Description: The purpose of the proposed action is to deactivate, decontaminate, and demolish (DD&D) surplus vacant, inactivated, or soon to be inactivated facilities to reduce lifecycle costs associated with surveillance and maintenance. The proposed action would return the location of the facilities to near original condition. There is limited risk to site personnel posed by remaining hazards within these buildings and structures. Principal hazards are asbestos, lead-based paint, small quantities of hazardous materials and waste, confined spaces, and possible residual radiological contamination. The proposed action would DD&D the buildings located at the Idaho

278

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I ' CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

' ' CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE 1 OF 12 PAGES 9B. DATED (SEE ITEM 11) 5. PROJECT NO. (If applicable) 4. REQUlSlTlONlPURCHASE REQ. NO. 2. AMENDMENTIMODIFICATION NO. MI39 extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

279

Novel platinum/carbon catalysts with cluster size control for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Project overview - Cluster chemistry - Catalysts and supports * Experimental - Novel catalyst preparation * Results - Metal cluster size - Electrochemical properties * Summary...

280

ORNL 2010-G00993/jcn UT-B ID 200902230  

E-Print Network (OSTI)

and cost ·· Reduces battery losses and improves battery operating conditions by eliminating battery ripple direct current (DC) bus capacitors are needed to absorb ripple currents and protect the battery the size and cost of high performance capacitors and eliminates the need for liquid cooling. This inverter

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

GRR/Section 6-ID-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-ID-b - Construction Storm Water Permit 6-ID-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-b - Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 06IDBConstructionStormwaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 6-ID-b.1 - EPA Construction General Permit Idaho does not have authority from the United States Environmental Protection Agency to issue a construction storm water permit. See Flowchart

282

GRR/Section 1-ID-a - Land Use Considerations | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 1-ID-a - Land Use Considerations GRR/Section 1-ID-a - Land Use Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 1-ID-a - Land Use Considerations 01IDALandUseConsiderations.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 01IDALandUseConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Add Text Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_1-ID-a_-_Land_Use_Considerations&oldid=685536" Categories: Regulatory Roadmap State Sections Geothermal Regulatory Roadmap Sections

283

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

on Docket ID: DOE-HQ-2011-0014 on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

284

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

285

Microsoft Word - 2013 (05-22-13) DOE-ID Operations Summary-13...  

NLE Websites -- All DOE Office Websites (Extended Search)

was restored to the E-3 diesel bus from commercial power, and equipment lost due to the power outage was restored. NE-ID--BEA-ATR-2013-0012 3 April 17: (Notification) As a...

286

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of InitiatorEGO signed NRSF to DOE NCO for information only. DOE NCO Page 1 of2 RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM (continued) DOECX-00126, Rev 0 V....

287

RL-721 REV4 Document ID Number: NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9405630, HCRC2003-200-044, & DOERL-97-56 R1 Additional Attachments: Page 1 of 2 RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM (continued) DOECX-00094 Rev 0 IV....

288

(SE-33)Intelligent ID-Based threshold system by an encryption and decryption from bilinear pairing  

Science Conference Proceedings (OSTI)

We suggest a new intelligent ID-based threshold secure system by an encryption and decryption protocol using (k, n)-threshold scheme which only k agents or more are engaged to reconstruct an encrypted data for a mobile intelligent ...

Young Whan Lee; Byung Mun Choi

2005-09-01T23:59:59.000Z

289

Microsoft Word - 2013 (05-22-13) DOE-ID Operations Summary-13...  

NLE Websites -- All DOE Office Websites (Extended Search)

May 16, 2013 DOE-ID Operations Summary For the Period April 1 to May 16, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory,...

290

GRR/Section 14-ID-d - Section 401 Water Quality Certification...  

Open Energy Info (EERE)

GRRSection 14-ID-d - Section 401 Water Quality Certification Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of...

291

Microsoft Word - DOE-ID-INL-13-024.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

24 24 SECTION A. Project Title: Idaho National Laboratory (INL) Road Sign Installation/Maintenance SECTION B. Project Description: The proposed action is to install new and repair/replace existing road signs and delineator/reflector poles as needed near paved roads and Priority 1 and 2 unpaved roads (as defined in Environmental Checklist (EC) Idaho National Engineering Laboratory (INEL)-02-024) throughout the INL as part of routine maintenance and to improve traffic safety. This includes roads located outside of and within developed areas at Central Facilities Area (CFA) and Critical Infrastructure Test Range Complex (CITRC), and roads outside the facility fences at Advanced Test Reactor (ATR) Complex, Radioactive Waste Management Complex (RWMC), Test Area North (TAN) and

292

Microsoft Word - DOE-ID-10-005.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: CPP-663 HVAC Systems Upgrade SECTION B. Project Description The scope of work will be to repair and/or replace the existing heating, ventilation, and air conditioning system located in building CPP-663 at the Idaho National Engineering Laboratory. The scope will be to repair the existing system or identify an energy efficient replacement to the existing system and place an NFPA 70E code compliant electrical metering system that will monitor building electrical usage. CPP-663 is a two story maintenance/ craft warehouse building. The building houses offices, maintenance shops, storage rooms, and other support functions. SECTION C. Environmental Aspects / Potential Sources of Impact 6. Soil Disturbance: An 8 X 14 foot concrete equipment pad will need to be constructed next to CPP-663.

293

Microsoft Word - DOE-ID-INL-13-023.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SECTION A. Project Title: Test Reactor Area (TRA)-680 Road Widening SECTION B. Project Description: The purpose and need for the proposed action is to widen the gravel interior perimeter road within the Advanced Test Reactor (ATR) Complex at a location near TRA-680 to provide room for vehicles to pass (see Figure 1). The proposed action would widen the road near TRA-680 by placing fill material in an area approximately 16 ft. by 40 ft. Fill material would be obtained from the Monroe Gravel Pit on the Idaho National Laboratory (INL) Site. Figure 1. Interior perimeter road near TRA-680 proposed for widening. SECTION C. Environmental Aspects or Potential Sources of Impact: Air Emissions - Fugitive dust may be generated while widening the road. All reasonable precautions would be taken to prevent

294

Microsoft Word - DOE-ID-INL-10-018.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Active Measurements Campaign (AMC) at the Materials and Fuels Complex (MFC) - Zero Power Physics Reactor (ZPPR) SECTION B. Project Description: . The Department of Energy (DOE) Office of Dismantlement and Transparency (NA-241) is funding an AMC at the Idaho National Laboratory (INL) that would be conducted at the ZPPR building at the MFC and will involve experimenters from several national laboratories and the United Kingdom (UK). These experimenters will determine how well and how rapidly unknown inspection objects [containing shielded, nuclear category (CAT-I) material] can be correctly characterized using a variety of inspection/detection technologies. The campaign will allow active technology developers to test their inspection systems in an environment (i.e., ZPPR

295

Microsoft Word - DOE-ID-INL-11-007.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL-11-007 INL-11-007 SECTION A. Project Title: Infrastructure Upgrades - Materials and Fuel Complex (MFC)- Irradiated Materials Characterization Laboratory (IMCL). SECTION B. Project Description The proposed action would construct and operate the Irradiated Materials Characterization Laboratory (IMCL) within the Materials and Fuels Complex (MFC) at the Idaho National Laboratory approximately 100 ft. to the north of the Hot Fuel Examination Facility (HFEF) (see Figure 1). MFC is a premier campus for nuclear energy RD&D and is focused on nuclear material examination, nuclear fuel technologies, and waste form development. The IMCL will strengthen and enhance these nuclear material analysis and research capabilities. The IMCL will be a stand-alone state-of-the-art nuclear laboratory used for hands-on and remote handling, characterizing,

296

Microsoft Word - DOE-ID-INL-11-014.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 SECTION A. Project Title: Advanced Test Reactor Core Internals Changeout (CIC) Outage - 2015 SECTION B. Project Description: The proposed action will provide for the sixth core internals changeout (CIC) outage of the Advanced Test Reactor (ATR), which is housed in building Test Reactor Area (TRA)-670, located at the Idaho National Laboratory (INL) ATR Complex. Activities scheduled during the CIC outage include the changeout of components in the high-flux region of the ATR core and support components, refueling, and maintenance activities. The periodic CIC of the ATR is necessary due to the impact the high neutron flux environment has on reactor core components. Over an extended period, this neutron exposure induces components stress and growth because of new element generation. If the Department of Energy (DOE) does not periodically replace

297

Microsoft Word - DOE-ID-INL-11-006.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: INL - USGS Geotechnical Drilling Program (USGS 131A) SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to use an existing well pad to construct a replacement well, USGS131A, about 25 ft north of the original well head (USGS 131). USGS 131A will be drilled to about 1,300 ft below surface level (BSL) then instrumented with a multilevel monitoring system in FY 2012. The new well will replace USGS 131, which will be abandoned or used as a water level monitoring well. USGS 131 has casing stuck in it that does not allow for multilevel instrumentation, therefore, a replacement well is necessary. The drilling scope for USGS 131A is an addendum to the 2003 approved Environmental Checklist (INEL-03-001) for USGS

298

Microsoft Word - DOE-ID-INL-13-020.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 SECTION A. Project Title: Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF) SECTION B. Project Description: Currently, dedicated space is unavailable for above-grade storage of Interim Storage Containers (ISCs) containing 55-gal drums of remote handled transuranic waste (RH-TRU). In the past this waste was packaged in specially constructed liners and placed into the RSWF. When ready for transfer this waste would then be removed from RSWF and transferred to CH2M-WG Idaho, LLC (CWI) where it was sorted and repackaged for shipment to Waste Isolation Pilot Plant (WIPP). The construction of this new interim storage area is needed to eliminate special packaging and placement into RSWF in order to reduce costs and exposure associated with repackaging

299

Microsoft Word - DOE-ID-10-005.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: CPP-663 HVAC Systems Upgrade SECTION B. Project Description The scope of work will be to repair and/or replace the existing heating, ventilation, and air conditioning system located in building CPP-663 at the Idaho National Engineering Laboratory. The scope will be to repair the existing system or identify an energy efficient replacement to the existing system and place an NFPA 70E code compliant electrical metering system that will monitor building electrical usage. CPP-663 is a two story maintenance/ craft warehouse building. The building houses offices, maintenance shops, storage rooms, and other support functions. SECTION C. Environmental Aspects / Potential Sources of Impact 6. Soil Disturbance: An 8 X 14 foot concrete equipment pad will need to be constructed next to CPP-663.

300

Microsoft Word - DOE-ID-INL-10-021.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 21 SECTION A. Project Title: Geotechnical Investigation for INL Remote-Handled Low-Level Waste Disposal SECTION B. Project Description: The proposed action would conduct geotechnical investigations at two 4-6 acre candidate sites for a Remote-Handled Low-Level Waste (RH LLW) Facility at the Idaho National Laboratory (INL). One site is located southwest of the Advanced Test Reactor (ATR)-Complex and the other site is located west of and across Lincoln Blvd. from the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF). The RH LLW Facility is one alternative being analyzed to address an anticipated shortfall of disposal capability following cessation of RHLLW disposal operations at the

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft Word - DOE-ID-12-020.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

20 20 SECTION A. Project Title: ZPPR Surveillance Glovebox SECTION B. Project Description: The purpose of the proposed action is to limit exposure hazards and better contain airborne hazards, beyond current capabilities, associated with performing surveillance, characterization, and repackaging activities for transuranic materials in the Zero Power Physics Reactor (ZPPR) workroom hoods. In order to meet this purpose and need, the Transuranic Surveillance Glovebox (TSG) would be installed. This equipment would replace one of the existing hoods used to open secondary containers of radiological material and inspect the condition of the primary packages. This activity is being done to address safety issues associated with the hoods and does not change or modify the scope or quantity of

302

Microsoft Word - DOE-ID-INL-13-011.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office SECTION B. Project Description: Install a 9000 BTU/hr split air conditioner in the SPO office of the FMF annex. 208V single phase power will be supplied from a new 20A breaker in the existing lighting panel (LP)-029. A new fusible disconnect switch will be installed on the outside of the building. Conduit will be field routed to the condensing unit which will sit on a concrete pad outside the west wall of the FMF office annex. The subcontractor will either purchase a pre-formed concrete pad or pour a pad. The evaporator will be mounted on the east wall of the SPO office and refrigerant and condensate drain lines will be routed through a new 4 inch penetration in the west wall of the annex. A

303

Microsoft Word - DOE-ID-INL-13-017.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: United States Geological Survey (USGS) Geotechncial Drilling for USGS 139 SECTION B. Project Description: The USGS proposes to drill an approximate 1,000-foot deep geotechnical corehole (USGS 139) into the eastern Snake River Plain aquifer. The location of the corehole will be 7.4 mile(s) (approximate) east of the Naval Reactors Facility (NRF) complex at the Northeast Quarter of the Southeast Quarter of the Southwest Quarter of Section 28, Township 4 North, Range 31 East (Figure 1); latitude/longitude (World Geodetic System [WGS] 1984 Datum) 43deg 38min 25.0sec N / 112deg 46min 06.7sec W, respectively. The borehole will be 5 inches in diameter, will have a locking wellhead installed after completion, will be marked with a brass survey marker,

304

Microsoft Word - DOE-ID-INL-11-013.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SECTION A. Project Title: Modifications to Central Facilities Area (CFA)-Live Fire Range and Main Gate Drinking Water SECTION B. Project Description: Modification of the drinking water systems at the CFA Live Fire Range and Main Gate is needed to improve water quality. The drinking water chlorinator at the Live Fire Range does not function properly and cannot be modified or repaired. Personnel at the facility have been using bottled drinking water for several years. There is no disinfection at the Main Gate drinking water system and bacterial contamination events have occurred. The proposed action would be performed during three phases:  Phase 1. Remove the existing chlorinator from the Live Fire Range drinking water system and install water filtering systems.

305

Microsoft Word - DOE-ID-11-015.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 15 SECTION A. Project Title: Idaho National Laboratory (INL) Support to Analysis and Measurement Systems Corporation (AMS) for Performance Monitoring Technology Deployment at the Advanced Test Reactor (ATR) on the INL SECTION B. Project Description: The purpose of this proposal is to expand the scope of traditional maintenance activities at the Advanced Test Reactor (ATR) to trend the performance of its equipment and anticipated failures before they occur. In order to identify and apply new predictive maintenance technologies at the ATR, a Research and Development (R&D) effort is needed to verify the ATR equipment and systems can benefit from these maintenance technologies, adapt the technologies to ATR equipment and systems, and establish the

306

Microsoft Word - DOE-ID-INL-13-005.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Land Mobile Radio - Bi Directional Amplifier (BDA) Installation SECTION B. Project Description The INL has contracted with White Cloud Communications to provide Land Mobile Radio Services for emergency first responders under a managed service contract. The contract includes provisions for area coverage and quality of service. Testing of the installed Radio Frequency backbone system revealed that certain buildings at the INL do not have adequate coverage. The engineered solution to remedy this service deficiency is to install Bi-Directional Amplifiers (BDAs) in the deficient areas. A typical BDA installation includes an outside antenna connected by cabling to an inside repeater which amplifies the signal. The installation process is typical for electrical

307

Microsoft Word - DOE-ID-INL-11-007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

INL-11-007 INL-11-007 SECTION A. Project Title: Infrastructure Upgrades - Materials and Fuel Complex (MFC)- Irradiated Materials Characterization Laboratory (IMCL). SECTION B. Project Description The proposed action would construct and operate the Irradiated Materials Characterization Laboratory (IMCL) within the Materials and Fuels Complex (MFC) at the Idaho National Laboratory approximately 100 ft. to the north of the Hot Fuel Examination Facility (HFEF) (see Figure 1). MFC is a premier campus for nuclear energy RD&D and is focused on nuclear material examination, nuclear fuel technologies, and waste form development. The IMCL will strengthen and enhance these nuclear material analysis and research capabilities. The IMCL will be a stand-alone state-of-the-art nuclear laboratory used for hands-on and remote handling, characterizing,

308

Microsoft Word - DOE-ID-INL-13-005.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Land Mobile Radio - Bi Directional Amplifier (BDA) Installation SECTION B. Project Description The INL has contracted with White Cloud Communications to provide Land Mobile Radio Services for emergency first responders under a managed service contract. The contract includes provisions for area coverage and quality of service. Testing of the installed Radio Frequency backbone system revealed that certain buildings at the INL do not have adequate coverage. The engineered solution to remedy this service deficiency is to install Bi-Directional Amplifiers (BDAs) in the deficient areas. A typical BDA installation includes an outside antenna connected by cabling to an inside repeater which amplifies the signal. The installation process is typical for electrical

309

Microsoft Word - DOE-ID-INL-13-011.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 SECTION A. Project Title: Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office SECTION B. Project Description: Install a 9000 BTU/hr split air conditioner in the SPO office of the FMF annex. 208V single phase power will be supplied from a new 20A breaker in the existing lighting panel (LP)-029. A new fusible disconnect switch will be installed on the outside of the building. Conduit will be field routed to the condensing unit which will sit on a concrete pad outside the west wall of the FMF office annex. The subcontractor will either purchase a pre-formed concrete pad or pour a pad. The evaporator will be mounted on the east wall of the SPO office and refrigerant and condensate drain lines will be routed through a new 4 inch penetration in the west wall of the annex. A

310

Microsoft Word - DOE-ID-INL-11-008.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Parking area expansion along road to Range #7 SECTION B. Project Description: Additional parking is needed during breacher training and other demonstration activities on range #7 to accommodate access by emergency response vehicles. Historically, participants have parked their vehicles on the gravel road leading to range #7 which restricts access to emergency response vehicles. The proposed action is to "grub" out an area of approximately 0.06 acres (about 110 ft long by 25 ft wide) along the east side of the range #7 road near the spot where breaching charges are assembled (see attached photo). The proposed parking area would be surfaced with pit-run gravel and would be maintained in conjunction with the

311

Microsoft Word - DOE-ID-INL-10-018.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: Active Measurements Campaign (AMC) at the Materials and Fuels Complex (MFC) - Zero Power Physics Reactor (ZPPR) SECTION B. Project Description: . The Department of Energy (DOE) Office of Dismantlement and Transparency (NA-241) is funding an AMC at the Idaho National Laboratory (INL) that would be conducted at the ZPPR building at the MFC and will involve experimenters from several national laboratories and the United Kingdom (UK). These experimenters will determine how well and how rapidly unknown inspection objects [containing shielded, nuclear category (CAT-I) material] can be correctly characterized using a variety of inspection/detection technologies. The campaign will allow active technology developers to test their inspection systems in an environment (i.e., ZPPR

312

Microsoft Word - DOE-ID-11-015.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Idaho National Laboratory (INL) Support to Analysis and Measurement Systems Corporation (AMS) for Performance Monitoring Technology Deployment at the Advanced Test Reactor (ATR) on the INL SECTION B. Project Description: The purpose of this proposal is to expand the scope of traditional maintenance activities at the Advanced Test Reactor (ATR) to trend the performance of its equipment and anticipated failures before they occur. In order to identify and apply new predictive maintenance technologies at the ATR, a Research and Development (R&D) effort is needed to verify the ATR equipment and systems can benefit from these maintenance technologies, adapt the technologies to ATR equipment and systems, and establish the

313

Microsoft Word - DOE-ID-INL-13-020.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20 20 SECTION A. Project Title: Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF) SECTION B. Project Description: Currently, dedicated space is unavailable for above-grade storage of Interim Storage Containers (ISCs) containing 55-gal drums of remote handled transuranic waste (RH-TRU). In the past this waste was packaged in specially constructed liners and placed into the RSWF. When ready for transfer this waste would then be removed from RSWF and transferred to CH2M-WG Idaho, LLC (CWI) where it was sorted and repackaged for shipment to Waste Isolation Pilot Plant (WIPP). The construction of this new interim storage area is needed to eliminate special packaging and placement into RSWF in order to reduce costs and exposure associated with repackaging

314

Microsoft Word - DOE-ID-12-020.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20 20 SECTION A. Project Title: ZPPR Surveillance Glovebox SECTION B. Project Description: The purpose of the proposed action is to limit exposure hazards and better contain airborne hazards, beyond current capabilities, associated with performing surveillance, characterization, and repackaging activities for transuranic materials in the Zero Power Physics Reactor (ZPPR) workroom hoods. In order to meet this purpose and need, the Transuranic Surveillance Glovebox (TSG) would be installed. This equipment would replace one of the existing hoods used to open secondary containers of radiological material and inspect the condition of the primary packages. This activity is being done to address safety issues associated with the hoods and does not change or modify the scope or quantity of

315

JGI - The GEBA Pilot Project  

NLE Websites -- All DOE Office Websites (Extended Search)

GEBA Sequencing Plans GEBA Sequencing Plans For status information, see the Genome Projects section, or go to Microbial Genomics to find the latest releases. Organism Domain Phylum Status IMG-ER NCBI PID Culture ID GOLD ID Acidimicrobium ferrooxidans DSM 10331 Bacteria Actinobacteria draft DSM 10331 Gi02326 Actinosynnema mirum 101, DSM 43827 Bacteria Actinobacteria draft 2500395345 19705 DSM 43827 Gi02064 Alicyclobacillus acidocaldarius acidocaldarius 104-IA, DSM 446 Bacteria Firmicutes draft 29405 DSM 446 Gi02324 Anaerococcus prevotii PC 1, DSM 20548 Bacteria Firmicutes draft DSM 20548 Gi02318 Atopobium parvulum IPP 1246, DSM 20469 Bacteria Actinobacteria draft 29401 DSM 20469 Gi02317 Beutenbergia cavernosa HKI 0122, DSM 12333 Bacteria Actinobacteria draft 2500395322 20827 DSM 12333 Gi02225

316

ProjectList 11072013.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LDRD Project List - FY 2013 LDRD Project List - FY 2013 Project ID Project Name FY Total FY2013-AKI-0310 Demistifying the hydration layer on nano oxide in suspensions by liquid cell TEM $50,758 FY2013-FAN-0313 In Situ, Real Time Imaging of Single Site Catalysts under Turnover Conditions $94,056 FY2013-GOR-1218 Dynamic Whitelist Generation for Automated Intrusion Response $69,043 FY2013-HUA-0413 Atomic and electronic level control of nanocluster catalysts encapsulated in MOFs $100,073 FY2013-JON-0114 Rapid, Small-Scale, High-Purity Rare Earth Metal Preparation $55,284 FY2013-WAN-0113 Femtosecond-Resolved Polarimetry Probes of Electronic Nematicity in Iron Pnictides $48,391 P/ANL2010-194 Acceleration of Cloud Microphysical Retrievals for Climate Models $102,400

317

Microsoft Word - DOE-ID-INL-12-004.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 SECTION A. Descriptive Information: Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change SECTION B. Project Description: MFC-794 CESB is currently being modified for reasons described in Environmental Checklist (EC) Idaho National Laboratory (INL)-10- 074 (OA 12). During construction it was determined that some of the equipment that will be located in the building will need non-contact cooling water in order to operate. This EC addresses the additional requirements associated with this equipment. The equipment (Hot Isostatic Press) that will occupy the CESB requires a potable water supply line and a drain line that will discharge to the MFC Industrial Wastewater System. This discharge will add a significant amount of water to the permitted system (MFC Industrial Wastewater Reuse

318

Microsoft Word - DOE-ID-INL-12-004.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 04 SECTION A. Descriptive Information: Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change SECTION B. Project Description: MFC-794 CESB is currently being modified for reasons described in Environmental Checklist (EC) Idaho National Laboratory (INL)-10- 074 (OA 12). During construction it was determined that some of the equipment that will be located in the building will need non-contact cooling water in order to operate. This EC addresses the additional requirements associated with this equipment. The equipment (Hot Isostatic Press) that will occupy the CESB requires a potable water supply line and a drain line that will discharge to the MFC Industrial Wastewater System. This discharge will add a significant amount of water to the permitted system (MFC Industrial Wastewater Reuse

319

Microsoft Word - DOE-ID-11-002 DOE Direct cooling system [1].doc  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 SECTION A. Project Title: Cooling System for Substation Bldg CPP-613 SECTION B. Project Description The scope of work includes the purchase and installation of an Energy Star compliant 208V three phase staged cooling system capable of maintaining CPP-613 at a temperature below 85 degrees F. The system shall be designed to operate at an elevation of 5000 feet with outside environmental temperatures ranging from -20°F to 100°F. The cooling system shall be pad mounted on the east side of the building between the two cable feeds. The concrete pad will be provided by DOE. The scope of work includes purchasing an appropriately sized cooling system, placing the unit on the concrete pad, making all necessary wall penetrations into the building, installing ductwork and air handlers inside the building, and installing a

320

GRR/Section 3-ID-a - State Lands Commercial Geothermal Lease | Open Energy  

Open Energy Info (EERE)

3-ID-a - State Lands Commercial Geothermal Lease 3-ID-a - State Lands Commercial Geothermal Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-a - State Lands Commercial Geothermal Lease 03IDAStateLandsCommercialGeothermalLease (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Idaho State Board of Land Commissioners Regulations & Policies Original Administrative Rule Draft Rules Leasing of Public Lands 58-301 et seq Geothermal Resources 47-1605 IX, Section 8 of Idaho's Constitution Triggers None specified Click "Edit With Form" above to add content 03IDAStateLandsCommercialGeothermalLease (1).pdf 03IDAStateLandsCommercialGeothermalLease (1).pdf Error creating thumbnail: Page number not in range.

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

GRR/Section 12-ID-a - State Flora & Fauna Considerations | Open Energy  

Open Energy Info (EERE)

GRR/Section 12-ID-a - State Flora & Fauna Considerations GRR/Section 12-ID-a - State Flora & Fauna Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-ID-a - State Flora & Fauna Considerations 12IDAFloraFaunaConsiderations.pdf Click to View Fullscreen Contact Agencies Idaho Department of Fish & Game Regulations & Policies Idaho Statutes 36.103 Triggers None specified Click "Edit With Form" above to add content 12IDAFloraFaunaConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Fish & Game preserves wildlife against any direct take, including wild animals, birds, and fish under Idaho Statutes 36.103.

322

GRR/Section 14-ID-c - Underground Injection Control | Open Energy  

Open Energy Info (EERE)

4-ID-c - Underground Injection Control 4-ID-c - Underground Injection Control < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-c - Underground Injection Control 14IDCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IDAPA 37.03.04 IDAPA 37.03.03 Triggers None specified Click "Edit With Form" above to add content Potential Roadblocks Extensive public comments can stretch the timeline since IDWR must respond to all comments, potentially hold a Fact Finding Hearing, and thoroughly review the input received in these processes prior to making a decision to issue or deny the permit. 14IDCUndergroundInjectionControlPermit.pdf

323

GRR/Section 18-ID-d - Solid Waste Management Facilities | Open Energy  

Open Energy Info (EERE)

8-ID-d - Solid Waste Management Facilities 8-ID-d - Solid Waste Management Facilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-d - Solid Waste Management Facilities 18IDDSolidWasteManagementFacilities (2).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.06 Triggers None specified Click "Edit With Form" above to add content 18IDDSolidWasteManagementFacilities (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho considers transfer stations, composting operations, incinerators and landfills solid waste management facilities. The state does not require a

324

GRR/Section 18-ID-a - Underground Storage Tank Systems | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-a - Underground Storage Tank Systems GRR/Section 18-ID-a - Underground Storage Tank Systems < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-a - Underground Storage Tank Systems 18IDAUndergroundStorageTankSystems.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.07 Rules Regulating Underground Storage Tank Systems Triggers None specified Click "Edit With Form" above to add content 18IDAUndergroundStorageTankSystems.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires notification

325

GRR/Section 14-ID-f - 401 NPDES Water Quality Certification | Open Energy  

Open Energy Info (EERE)

ID-f - 401 NPDES Water Quality Certification ID-f - 401 NPDES Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-f - 401 NPDES Water Quality Certification 14IDFSection401NPDESWaterQualityCertification.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDFSection401NPDESWaterQualityCertification.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

326

GRR/Section 3-ID-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

3-ID-c - Encroachment Permit 3-ID-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-c - Encroachment Permit 03IDCEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.42 Triggers None specified Click "Edit With Form" above to add content 03IDCEncroachmentPermit.pdf 03IDCEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer needs an Encroachment Permit from the Idaho Transportation Department (ITD) to add, modify, relocate, maintain, or remove an encroachment on the state highway or within the state highway rights-of way

327

GRR/Section 14-ID-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-b - NPDES Permitting Process GRR/Section 14-ID-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-b - NPDES Permitting Process 14IDBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14IDBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 'National Pollutant Discharge Elimination System Permits' The NPDES program requires facilities discharging from a point source into

328

GRR/Section 6-ID-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-ID-a - Transportation Permit GRR/Section 6-ID-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-a - Transportation Permit 06IDATransportationPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.21 Triggers None specified Click "Edit With Form" above to add content 06IDATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Overlegal permits are issued to protect the "safety and convenience of the general public." The Idaho Transportation Department is also concerned with

329

GRR/Section 5-ID-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

ID-a - Drilling and Well Development ID-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-ID-a - Drilling and Well Development 05IDADrillingWellDevelopment.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IC §42-233: Appropriation of Water, Geothermal IC §42-4003: Permits IC §42-4004: Processing Applications IC §42-4011: Name of Owner Triggers None specified Click "Edit With Form" above to add content Best Practices Community outreach Talk to the local county Potential Roadblocks Incomplete applications result in longer approval times by IDWR 05IDADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in range.

330

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity | Open  

Open Energy Info (EERE)

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-ID-c - Certificate of Public Convenience and Necessity 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies Idaho Code 61-526 IDAPA 31.01.01 Triggers None specified Click "Edit With Form" above to add content 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Electrical corporations must receive a Certificate of Public Convenience

331

GRR/Section 14-ID-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-ID-d - Section 401 Water Quality Certification GRR/Section 14-ID-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-d - Section 401 Water Quality Certification 14IDDSection401WaterQualityCertificationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDDSection401WaterQualityCertificationProcess.pdf 14IDDSection401WaterQualityCertificationProcess.pdf Error creating thumbnail: Page number not in range.

332

GRR/Section 18-ID-c - Wastewater Pretreatment Permit | Open Energy  

Open Energy Info (EERE)

8-ID-c - Wastewater Pretreatment Permit 8-ID-c - Wastewater Pretreatment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-c - Wastewater Pretreatment Permit 18IDCWastewaterPretreatmentPermit.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 18IDCWastewaterPretreatmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Industrial wastewater permits are issued at the local level. If wastewater is not discharged into a municipal sewer system, the nonpoint source and NPDES permit inquiries are sufficient. A common approach to wastewater treatment is to treat on-site. See Idaho's

333

GRR/Section 11-ID-a - State Cultural Considerations | Open Energy  

Open Energy Info (EERE)

-ID-a - State Cultural Considerations -ID-a - State Cultural Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-ID-a - State Cultural Considerations 11IDAStateCulturalConsiderations (2).pdf Click to View Fullscreen Contact Agencies Idaho State Historical Society Regulations & Policies Idaho's Protection of Graves Statute IS 27-503 Triggers None specified Click "Edit With Form" above to add content 11IDAStateCulturalConsiderations (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has a statute that provides state law protection to cairns and grave sites. The Idaho State Historical Society administers the protections

334

GRR/Section 14-ID-a - Nonpoint Source Pollution | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-a - Nonpoint Source Pollution GRR/Section 14-ID-a - Nonpoint Source Pollution < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-a - Nonpoint Source Pollution 14IDANonpointSourcePollution.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies Clean Water Act Idaho Code Triggers None specified Click "Edit With Form" above to add content 14IDANonpointSourcePollution.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (IDEQ) developed Idaho's

335

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit | Open  

Open Energy Info (EERE)

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-b - Air Quality Permit - Tier II Operating Permit 15IDBAirQualityPermitTierIIOperatingPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDBAirQualityPermitTierIIOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Tier II Operating Permits are issued to facilities or stationary sources

336

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

337

GRR/Section 19-ID-a - Water Access and Water Rights | Open Energy  

Open Energy Info (EERE)

19-ID-a - Water Access and Water Rights 19-ID-a - Water Access and Water Rights < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-ID-a - Water Access and Water Rights 19IDAWaterAccessAndWaterRightsIssues.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies Idaho Code Title 42 Triggers None specified Click "Edit With Form" above to add content 19IDAWaterAccessAndWaterRightsIssues.pdf 19IDAWaterAccessAndWaterRightsIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Water Resources (IDWR) has the exclusive authority for regulation of appropriation of the public surface and ground waters of

338

GRR/Section 18-ID-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-b - Hazardous Waste Permit Process GRR/Section 18-ID-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-b - Hazardous Waste Permit Process 18IDBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies Idaho Hazardous Waste Management Act IDAPA 58.01.05 Rules and Standards for Hazardous Waste 40 CFR 124.31 Pre-application public meeting and notice 40 CRF 124.10 Public notice of permit actions and public comment period 40 CFR 124.12 Public hearings 40 CFR 270.13 Contents of Part A of the permit application Triggers None specified Click "Edit With Form" above to add content 18IDBHazardousWastePermitProcess.pdf 18IDBHazardousWastePermitProcess.pdf

339

GRR/Section 20-ID-a - Well Abandonment Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 20-ID-a - Well Abandonment Process GRR/Section 20-ID-a - Well Abandonment Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20-ID-a - Well Abandonment Process 20IDAWellAbandonmentProcess.pdf Click to View Fullscreen Contact Agencies [[Idaho Department of Water Resources]] Regulations & Policies Drilling for Geothermal Resources Rule 45 Triggers None specified Click "Edit With Form" above to add content 20IDAWellAbandonmentProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the well abandonment procedures in the state of Idaho. The director of the Idaho Department of Water Resources

340

Project Payette  

SciTech Connect

This is the concept for Project Payette, a nuclear event in the Seismic Detection Research Program. For this experiment, a nuclear explosive in the range of 5 to 10 kt will be detonated at a depth of 2000 to 3000 ft in an underground cavity of sufficient size that the walls of the cavity experience only elastic motion. The site will be located in a salt dome. Project Payette has been divided into three phases. Phase I will include site evaluation and engineering design of the construction of the cavity. It is estimated to require about 1 year. Phase II will include construction of the cavity and emplacement hole. It is estimated to require about 2 years. Phase III will include emplacement of instruments and the device, the detonation and the post-shot program including cavity re-entry. This is estimated to require about 1 year. The scope of this concept is intended to define Project Payette sufficiently will that Phase I work may proceed.

Warner, D.

1966-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

342

th e american bir d conse rvan c y g u id e to bird conservation  

E-Print Network (OSTI)

th e american bir d conse rvan c y g u id e to bird conservation by daniel j. lebbin, michael j CONSERVATION 1886 George Grinnell founds the first Audubon So- ciety. 1896 Harriet Hemenway, her cousin Minna conservation for waterfowl and other birds. 1934 Roger Tory Peterson publishes his landmark Field Guide

McReynolds, Ben

343

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2012-2013 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Huang, Haiying

344

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2010-2011 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Corley, Bill

345

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2011-2012 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Corley, Bill

346

IDS: Thermodynamic-kinetic-empirical tool for modelling of solidification, microstructure and material properties  

Science Conference Proceedings (OSTI)

IDS (InterDendritic Solidification) is a thermodynamic-kinetic-empirical tool for simulation of solidification phenomena of steels including phase transformations from melt down to room temperature. In addition, important thermophysical material properties ... Keywords: Continuous casting, Inclusions, Material properties, Microstructure, Solidification

J. Miettinen; S. Louhenkilpi; H. Kytnen; J. Laine

2010-03-01T23:59:59.000Z

347

Salt River Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Name Salt River Project Place Tempe, Arizona Utility Id 16572 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Salt River Project Smart Grid Project was awarded $56,859,359 Recovery Act Funding with a total project value of $114,003,719.

348

Microsoft Word - DOE-ID-12-041 INL EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

SECTION A. Project Title: Monitoring and Control of the Hybrid Laser-Gas Metal Arc Welding Process - Idaho National Laboratory SECTION B. Project Description This project will...

349

Microsoft Word - DOE-ID-11-021 - North Wind EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

A. Project Title: Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC SECTION B. Project Description The deterioration of asphalt roads, pads and...

350

Microsoft Word - DOE-ID-12-009 Colorado School of Mines.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

09 SECTION A. Project Title: Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line SECTION B. Project Description The Colorado School Mines project has three...

351

Microsoft Word - DOE-ID-12-016 Kansas State.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6 SECTION A. Project Title: Reactor Infrastructure Improvement at KSU Nuclear Reactor - Kansas State University SECTION B. Project Description The Kansas State University project...

352

Building Technologies Office: Small- and Medium-Sized Building Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

Small- and Medium-Sized Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project to someone by E-mail Share Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Facebook Tweet about Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Twitter Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Google Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Delicious Rank Building Technologies Office: Small- and Medium-Sized Building

353

Idaho National Laboratory, Former Production Workers Screening Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Laboratory, Former Production Workers Screening Idaho National Laboratory, Former Production Workers Screening Projects Idaho National Laboratory, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: INL Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: David Fry 1055 Austin Avenue Idaho Falls, ID 83404 Community Care 2725 Channing Way Idaho Falls, ID 83404 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers, in conjunction with Queens College of the City University of New York. Free of charge, eligible workers can receive a medical exam, including chest X-ray and breathing

354

Weasel ID  

NLE Websites -- All DOE Office Websites (Extended Search)

question for you. (You showed up on page 1 of a Yahoo search on "weasel") Our cat recently killed (but didn't mangle) a small mammal of the weasel family (it looks in...

355

Applicant DOE Award Project Location Project Focus Feasibility Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

buildings and assist the Tribe's efforts to buildings and assist the Tribe's efforts to reduce the amount of energy used in their buildings. The Sea Lion Corporation $200,000 Hooper Bay, AK The project will train staff members to become energy assessors and weatherization technicians who specialize in energy efficient building construction and energy saving technologies. A feasibility study will also be conducted to determine how to achieve a 30 percent reduction in residential and commercial energy use and show the economic benefits of energy efficiency. Coeur d'Alene Tribe $163,952 Plummer, ID This project will assess and determine the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The goal is to

356

DOE-ID FOIA Type A Accident Investigation Board Report - July 28, 1998  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Reading Room Documents Electronic Reading Room Documents Freedom of Information Act (FOIA) More on FOIA/Privacy Act Electronic Request Form Frequently Ask Questions Frequently Requested Documents Guides Helpful Links Points of Contact and Privacy Act Advisory Privacy Act Reading Room DOE-ID Public Reading Room Research Library You are here: DOE-ID Home > FOIA > Type A Accident Investigation Board Report - July 28, 1998 Type A Accident Investigation Board Report - July 28, 1998 Fatality and Multiple Injuries Resulting From Release of Carbon Dioxide at Building 648, Test Reactor Area Idaho National Engineering and Environmental Laboratory Files are provided in Adobe Acrobat format. If you experience problems reading these files please download the latest Adobe Acrobat reader at http://get.adobe.com/reader/ Download Acrobat Reader . Adobe Acrobat file Reader will allow you to view, navigate, and print these PDF files on all major computing platforms.

357

GRR/Section 17-ID-a - Aesthetic Resource Assessment | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 17-ID-a - Aesthetic Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17-ID-a - Aesthetic Resource Assessment 17IDAAestheticResourceAssessment.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 17IDAAestheticResourceAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

358

GRR/Section 3-ID-b - State Land Access | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-ID-b - State Land Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-b - State Land Access 03IDBStateLandAccess (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Regulations & Policies IDAPA 20.03.08 -Easements on State-Owned Lands Leasing of Public Lands 58-301 et seq Geothermal Resources 47-1605 Triggers None specified Click "Edit With Form" above to add content 03IDBStateLandAccess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

359

Ronald E. Gill (NE), Scoville, ID - Level I Curtis Roth (EM), Idaho  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E. Gill (NE), E. Gill (NE), Scoville, ID - Level I Curtis Roth (EM), Idaho Falls, ID - Level I Jared T. Howerton (NNSA), Oak Ridge, TN - Level I Richard L. Person (NNSA), DOE HQ - Level I Phillip (Tony) A. Polk (EM), Aiken, SC (Savannah River) - Level IV Jane Powell-Dolan (LM), Cincinnati, OH - Level I Eric M. Thompson (NNSA), Oak Ridge, TN - Level II Congratulations to our newly certified FPDs! The Certification Review Board (CRB or 'the Board') convened on Friday, Sep- tember 24 to review certifi- cation candidates and dis- cuss several topics. The Department of Energy (DOE) met the FY2010 tar- gets for the Root Cause Analysis, Corrective Action Plan metrics 7 and 8, as fol- lows: DOE surpassed the target for Metric #7 (95% of pro-

360

GRR/Section 19-ID-b - Change Application Process | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 19-ID-b - Change Application Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-ID-b - Change Application Process 19IDBChangeApplicationProcess (2).pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies Idaho Code 42-222 Triggers None specified Click "Edit With Form" above to add content 19IDBChangeApplicationProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A water right transfer is a change to a water right's point of diversion,

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE Hydrogen Analysis Repository: Projected Benefits - GPRA  

NLE Websites -- All DOE Office Websites (Extended Search)

Projected Benefits - GPRA Projected Benefits - GPRA Project Summary Full Title: Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs Project ID: 208 Principal Investigator: Michael Leifman Keywords: Energy efficiency; energy use; energy savings; renewable Purpose Assess the past and future contributions of the programs conducted by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to DOE's goals of providing affordable, clean and reliable energy. The program benefits are reported in EERE's annual Congressional Budget Request. This analysis fulfills the requirements of the Government Performance and Results Act of 1993. Performer Principal Investigator: Michael Leifman Organization: U.S. Department of Energy Address: 1000 Independence Ave., SW

362

CKBGroup/Collaborative Projects | Open Energy Information  

Open Energy Info (EERE)

CKBGroup/Collaborative Projects CKBGroup/Collaborative Projects < CKBGroup Jump to: navigation, search Home | 2013 Workshop | Previous Events | CKB Snapshots | Collaborative Projects | Shared Tools One of the prime purposes of the CKB Group is to encourage closer collaboration between climate knowledge brokers. Seven collaborative projects have been underway over the past eighteen months, with support from CDKN. Most of these projects are at or nearing completion. Substantial progress has been made, a range of innovative tools and approaches that have been developed, and some important lessons learned in the process. Highlights are presented below. Title Organisations involved Description/Status Knowledge Navigator IDS (lead) with AKP, CCCCC & REEEP An interactive tool that guides users to the most suitable website for them. It has 103 initiatives included in its database and is now live via a demonstration site, and available to install free of charge as a widget on your own site. See shared tools to see it in operation.

363

Leadership in Energy and Environmental Design (LEED) Project Profiles |  

Open Energy Info (EERE)

Leadership in Energy and Environmental Design (LEED) Project Profiles Leadership in Energy and Environmental Design (LEED) Project Profiles Jump to: navigation, search Tool Summary Name: Leadership in Energy and Environmental Design (LEED) Project Profiles Agency/Company /Organization: U.S. Green Building Council Sector: Energy Focus Area: Buildings Phase: Create a Vision, Evaluate Options, Develop Goals Resource Type: Case studies/examples User Interface: Website Website: www.usgbc.org/DisplayPage.aspx?CMSPageID=1721 Cost: Free The LEED Project Profile (page) is repository of LEED certified projects which provides profiles for specific projects, including strategies which were included in the project. This page can be used to generate ideas for various building types through a community. Overview The LEED Project Profile (page) is repository of LEED certified projects

364

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

365

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

366

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

367

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

368

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTFWCT I CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2 PAGES MI10 I See Block 16C I REQ. NO. BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 2. AMENDMENTIMODIFICATION NO. 1 3. EFFECTIVE DATE 1 4. REQUISITIONIPURCHASE 1 5. PROJECT NO. (If a ~ ~ l i c a b l e l . a , U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 96. DATED (SEE ITEM 1 1 ) 6. ISSUED BY CODE 1 7. ADMINISTERED BY (If other than Item 6 J CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 DE-AC04-00AL66620 1 1 106. DATED (SEE ITEM 1 0 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code)

369

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BM-07-072D and WH-07-073A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07-072D and WH-07-073A 07-072D and WH-07-073A Title: Installation of BM and WH Wellhead Survey Monuments Description: Subcontractor shall provide all labor, supervision, materials, consumables, equipment, tools, storage, transportation, and services required for the installation of new wellhead survey monuments at the Bryan Mound and West Hackberry SPR sites. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a Significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

370

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-MM-1066A, BM-1067A, WH-1068A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A, BM-1067A, WH-1068A A, BM-1067A, WH-1068A Title: Variable Frequency Drivers for RWIS Pumps GFE Description: Vendor shall provide and deliver variable frequency drivers for the Raw Water Intake Structure (RWIS) pumps at the Big Hill, Bryan Mound, and West Hackberry SPR sites as Government Furnished Equipment (GFE). Installation will be performed by others. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

371

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BC-MM-669 and BC-MM-673  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

669 and BC-MM-673 669 and BC-MM-673 Title: BC Site Building Upgrades, Phases II and III Description: Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to perform various building upgrades at BC Buildings 401, 402, 403, 408, 415, and 416 (Phase II) and BC Buildings 401, 402, 413, and 414 (Phase III). Subcontractor shall evaluate and implement Green Building Design where applicable. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

372

Response to ISRP Review Comments: Project ID 35029 Transfer IHN virus genetic strain typing technology to fish health  

E-Print Network (OSTI)

will thereafter test twice a year with two isolates. Where errors occur we will troubleshoot to identify

373

xml version="1.0" encoding="utf-8"?> <project id="cf35e0be ...  

Science Conference Proceedings (OSTI)

... the "buzzdmeter" * Rate & share real-time ratings of places with friends using the "buzz it" feature * Broadcast your rating to Facebook & Twitter to ...

2012-11-15T23:59:59.000Z

374

Microsoft Word - DOE-ID-11-022 Ohio State - Cao EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment for Strengthening the Research and Education in Nuclear Energy at the Ohio State University SECTION B. Project Description The overall goal of this project is to...

375

Microsoft Word - DOE-ID-13-050 Northwestern EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Predictive Characterization of Aging and Degradation of Reactor Materials in Extreme Environments - Northwestern University SECTION B. Project...

376

Microsoft Word - DOE-ID-13-034 NC State B1-31.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4 SECTION A. Project Title: A Positron Microprobe Spectrometer for Defects and Nano-Vacancy Characterization in Materials - North Carolina State University SECTION B. Project...

377

Complete genome sequence of Catenulispora acidiphila type strain (ID 139908T)  

E-Print Network (OSTI)

60%. Strains with a genome sequencing project registered inin the acknowledgements. Genome sequencing and annotationin Table 2. Table 2. Genome sequencing project information

Copeland, Alex

2010-01-01T23:59:59.000Z

378

Microsoft Word - DOE-ID-13-023 Vanderbilt EC B3-15.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

3 SECTION A. Project Title: Development of a Nano-modified Concrete for Next Generation of Storage Systems - Vanderbilt University SECTION B. Project Description The goal of...

379

Microsoft Word - DOE-ID-11-007 Colorado Mines EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

7 SECTION A. Project Title: Imaging Upgrades for the Colorado School of Mines Nuclear Science and Engineering Program - Colorado School of Mines SECTION B. Project Description This...

380

Microsoft Word - DOE-ID-13-076 Utah State EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6 SECTION A. Project Title: Optical Fiber Based Laser System for Thermophysical Properties at Very High Temperatures - Utah State University SECTION B. Project Description Utah...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Microsoft Word - DOE-ID-12-034 EPRI EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4 SECTION A. Project Title: SiC-SiC Composite for Fuel Structure Applications - Electric Power Research Institute SECTION B. Project Description The primary objective of the...

382

Microsoft Word - DOE-ID-11-004 Illinois EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign SECTION B. Project Description The scope of the project includes...

383

Microsoft Word - DOE-ID-11-020 Ohio State - Blue EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Systems and Research Capabilities of the Ohio State University Nuclear Reactor Laboratory SECTION B. Project Description The object of this project by the...

384

Microsoft Word - DOE-ID-12-008 Missouri EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 SECTION A. Project Title: Nuclear Instrumentation Upgrade for MURR Reactor Power Level Monitoring - University of Missouri SECTION B. Project Description The objective of this...

385

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

386

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

387

Empirical findings on team size and productivity in software development  

Science Conference Proceedings (OSTI)

The size of software project teams has been considered to be a driver of project productivity. Although there is a large literature on this, new publicly available software repositories allow us to empirically perform further research. In this paper ... Keywords: Effort estimation datasets, ISBSG repository, Productivity, Team size

D. Rodrguez; M. A. Sicilia; E. Garca; R. Harrison

2012-03-01T23:59:59.000Z

388

Sawtooth Wind Project | Open Energy Information  

Open Energy Info (EERE)

Wind Project Wind Project Jump to: navigation, search Name Sawtooth Wind Project Facility Sawtooth Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PowerWorks Developer PowerWorks (Idaho Winds) Energy Purchaser Idaho Power / Seattle City Lights Location Elmore County ID Coordinates 42.992577°, -115.396194° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.992577,"lon":-115.396194,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

389

Ohio Closure Projects Ceremony | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Closure Projects Ceremony Ohio Closure Projects Ceremony Ohio Closure Projects Ceremony January 19, 2007 - 9:59am Addthis Remarks for Energy Secretary Samuel Bodman Thank you, Alan Boeckmann for that kind introduction. It is a privilege to be with you today. I am pleased to be joined by my cabinet colleague Stephen Johnson, the administrator of the Environmental Protection Agency. It's also good to see Sen. George Voinovich. Senator, thank you for your leadership on so many issues critical to America's energy security and for all you've done to make today a reality. I'd also like to recognize the thousands of dedicated people, many of whom are with us today, involved in the cleanup projects here at Fernald and in Ashtabula and Columbus. If not for your tireless efforts, as well as the support of many, federal,

390

Horse Butte Wind Project | Open Energy Information  

Open Energy Info (EERE)

Horse Butte Wind Project Horse Butte Wind Project Jump to: navigation, search Name Horse Butte Wind Project Facility Horse Butte Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horse Butte Wind 1 LLC Developer Utah Associated Municipal Power Systems Location Bonneville ID Coordinates 43.491689°, -111.789344° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.491689,"lon":-111.789344,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

391

Alternative Muon Front-end for the International Design Study (IDS)  

E-Print Network (OSTI)

We discuss alternative designs of the muon capture front end of the Neutrino Factory International Design Study (IDS). In the front end, a proton bunch on a target creates secondary pions that drift into a capture channel, decaying into muons. A sequence of RF cavities forms the resulting muon beams into strings of bunches of differing energies, aligns the bunches to (nearly) equal central energies, and initiates ionization cooling. This design is affected by limitations on accelerating gradients within magnetic fields. The effects of gradient limitations are explored, and mitigation strategies are presented

Alekou, A; Martini, M; Prior, G; Rogers, C; Stratakis, D; Yoshikawa, C; Zisman, M

2010-01-01T23:59:59.000Z

392

Cat heart Size  

NLE Websites -- All DOE Office Websites (Extended Search)

heart Size Name: Iris Status: student Grade: K-3 Location: OR Country: USA Date: NA Question: Can you tell me the size of a cats heart? Replies: Iris A cat's heart is about the...

393

Cat heart Size  

NLE Websites -- All DOE Office Websites (Extended Search)

Cat heart Size Name: Rebecca Status: student Grade: 6-8 Location: FL Country: USA Date: Spring 2011 Question: What is the average size of a cat's heart? Replies: Hi Rebecca, That...

394

Hopper Job Size Charts  

NLE Websites -- All DOE Office Websites (Extended Search)

charts shows the fraction of hours used on Hopper in each of 5 job-core-size bins. 2012 Usage by Job Size Chart 2011 . This chart shows the fraction of hours used on Hopper by jobs...

395

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

396

(SSS)Capital Asset Project List_1.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approved Project Approved Project End Date Project Status Critical Decision Total Project Cost Site 01-D-416 Waste Treatment and Immobilization Plant (WTP) 11/30/2019 Active CD3 $12,263,000,000 Office of River Protection 05-D-405 Salt Waste Processing Facility (SWPF) 12/31/2018 Active CD3 $1,339,000,000 Savannah River Site 12-D-403 Savannah River Glass Waste Storage Building #3 TBD On Hold Pre CD-2 CD1 $103,000,000 Savannah River Site CBC-LBNL-0040 LBNL Old Town Demolition Project 9/30/2017 Active CD0 $45,000,000 Lawrence Berkely National Laboratory ID-0012B.C1 Idaho Spent Fuel Facility (ISFF) Project 12/30/2026 On Hold Pre CD-2 CD0 $560,000,000 Idaho National Laboratory ID-0014B.C2 Calcine Disposition Project (CDP) 2/3/2025 Active CD0 $16,000,000,000 Idaho National Laboratory IFDP Integrated Facility Disposition Project (IFDP)

397

2013-12-16 Capital Asset Project List.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approved Project End Approved Project End Date Project Status Critical Decision Total Project Cost Site 01-D-416 Waste Treatment and Immobilization Plant (WTP) 11/30/2019 Active CD3 $12,263,000,000 Office of River Protection 05-D-405 Salt Waste Processing Facility (SWPF) 12/31/2018 Active CD3 $1,339,000,000 Savannah River Site 12-D-403 Savannah River Glass Waste Storage Building #3 TBD On Hold Pre CD-2 CD1 $103,000,000 Savannah River Site CBC-LBNL-0040 LBNL Old Town Demolition Project 3/30/2018 Active CD1 $49,000,000 Lawrence Berkely National Laboratory ID-0012B.C1 Idaho Spent Fuel Facility (ISFF) Project 12/30/2026 On Hold Pre CD-2 CD0 $560,000,000 Idaho National Laboratory ID-0014B.C2 Calcine Disposition Project (CDP) 2/3/2025 Active CD0 $16,000,000,000 Idaho National Laboratory IFDP Integrated Facility Disposition Project (IFDP)

398

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Rev. 1 4 Rev. 1 I. Project Title: Washington River Protection Solutions & Advanced Technologies & Laboratories International- Proposed Actions for CY 2013 Scheduled To Take Place Under ex B3.6, "Small-Scale Research and Development, Laboratory Operations, and Pilot Projects" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) & Advanced Technologies & Laboratories International Inc. (ATL) will perform indoor bench-scale & small-scale research & development projects, conventional laboratory operations, & pilot projects to verify proof-

399

Mission Need Statement: Idaho Spent Fuel Facility Project  

SciTech Connect

Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

Barbara Beller

2007-09-01T23:59:59.000Z

400

Mission Need Statement: Idaho Spent Fuel Facility Project  

SciTech Connect

Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

Barbara Beller

2007-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - DOE-ID-13-001 General Atomics EC B3-6.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 SECTION A. Project Title: Development of ASTM Standard for SiC-SiC Joint Testing - General Atomics SECTION B. Project Description General Atomics (GA) proposes to develop an...

402

Microsoft Word - DOE-ID-INL-12-028-1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

The project would use equipment that was installed at two locations in Texas near wind turbine farms in support of the DOE-NOAA Wind Forecast Improvement Project. The use of re-...

403

Microsoft Word - DOE-ID-13-016 Texas B1-31.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6 SECTION A. Project Title: In-core Neutron Detectors for The University of Texas at Austin TRIGA Reactor SECTION B. Project Description The University of Texas (UT) proposes to...

404

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

405

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

. EFFECTIVE DATE (M/DIY) 4. REQUISITION/PURCHASE REQ. NO. -f 5. PROJECT NO. (Ifapplicable)2. AMENDMENT

406

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE (M/DIY) 4. REQUISITIONIPURCHASE REQ. NO. J5. PROJECT NO. (If applicable) M

407

KDOT Grainfield Wind Project | Open Energy Information  

Open Energy Info (EERE)

Grainfield Wind Project Grainfield Wind Project Jump to: navigation, search Name KDOT Grainfield Wind Project Facility KDOT Grainfield Sector Wind energy Facility Type Community Wind Location KS Number of Units 1 Wind Turbine Manufacturer SkyStream Wind for Schools Portal Turbine ID 101029 References Wind Powering America[1] Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

408

KDOT Osborne Wind Project | Open Energy Information  

Open Energy Info (EERE)

Wind Project Wind Project Jump to: navigation, search Name KDOT Osborne Wind Project Facility KDOT Osborne Sector Wind energy Facility Type Community Wind Location KS Number of Units 1 Wind Turbine Manufacturer SkyStream Wind for Schools Portal Turbine ID 105071 References Wind Powering America[1] Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

409

Cape Wind Energy Project A-252 December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Energy Project A-252 December 2008 Final EIS Appendix A Figures, Maps and Tables U.S. Department of the Interior Minerals Management Service MMS Table 1.2-1 List of Required Permits and Approvals for the Project Agency Jurisdiction Permit Description ID Number Date Applied Date Approved FEDERAL Department of Interior - Minerals Management Service Outer Continental Shelf Lease, Easement or Right-of-way Under Sec. 8 of the OCS Lands Act 9/14/05 USACE Draft Environmental Impact Statement November 2004 MMS Draft Environmental Impact Statement January 2008 Final Environmental Impact Statement To be filed Council on Environmental Quality, National Environmental Policy Act (NEPA) NEPA jurisdiction is over the entire project Record of Decision

410

CAES Wind Project | Open Energy Information  

Open Energy Info (EERE)

Wind Project Wind Project Jump to: navigation, search Name CAES Wind Project Facility CAES Sector Wind energy Facility Type Community Wind Location ID Coordinates 43.522243°, -112.053963° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.522243,"lon":-112.053963,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

411

project finance | OpenEI  

Open Energy Info (EERE)

project finance project finance Dataset Summary Description This dataset highlights trends in financing terms for U.S. renewable energy projects that closed financing between Q3 2009 and Q3 2010. Information tracked includes debt interest rates, equity returns, financial structure applied, PPA duration, and other information. NREL's Renewable Energy Finance Tracking Initiative (REFTI) tracks renewable energy project financing terms by technology and project size. The intelligence gathered is intended to reveal industry trends and to inform input assumptions for models. Source NREL Date Released March 27th, 2011 (3 years ago) Date Updated Unknown Keywords biomass financial geothermal project finance solar PV wind onshore Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon RE Project Finance Trends Q3 2009 - Q3 2010 (xlsx, 309.2 KiB)

412

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

National Nuclear Security Administration (NNSA)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

413

Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B:  

U.S. Energy Information Administration (EIA) Indexed Site

Report Period: Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B: Zip Code - Secure File Transfer option available at: - - - - Email form to: OOG.SURVEYS@eia.doe.gov Fax form to: (202) 586-9772 Email address: Oil & Gas Survey U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 1. Total Acquisitions (Enter the total volume of foreign crude oil acquired during the report month for importation into the United States. This is the sum of column (l), Part III, excluding resubmission.) 2. Offshore Inventories (Enter the total volume of foreign oil owned by the firm, for eventual importation into the United States which is held in storage outside the United States and/or is enroute to the United States as of the

414

GRR/Section 3-ID-e - Term Easement | Open Energy Information  

Open Energy Info (EERE)

e - Term Easement e - Term Easement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-e - Term Easement 03IDGTermEasement.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Regulations & Policies IDPA 20.03.08 Idaho Code 58-603 Triggers None specified Click "Edit With Form" above to add content 03IDGTermEasement.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands (IDL) requires a Term Easement for access across state lands and for right of ways across state lands. Note, an easement is not required for lands covered under a Geothermal Lease.

415

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

416

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ( I. ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I. ID CODE / DE-ACO4-OOAL6662O ' 10s. DATED (SEE ITEM 13) PAGE I OF 2 PAGES Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE

417

Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite)  

U.S. Energy Information Administration (EIA) Indexed Site

Report Period: Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite) Secure File Transfer option available at: (e.g., PO Box, RR) Electronic Transmission: The PC Electronic Data Reporting Option (PEDRO) is available. Zip Code: - If interested in software, call (202) 586-9659. Email form to: Fax form to: (202) 586-9772 - - Mail form to: Oil & Gas Survey - - U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 OOG.SURVEYS@eia.doe.gov Contact Name: Version No.: 2013.01 Date of this Report: Mo Day State: Year Phone No.: DOMESTIC CRUDE OIL FIRST PURCHASE REPORT Company Name: A completed form must be filed by the 30th calendar day following the end of the report

418

North Portal Fuel Storage System Fire Hazard Analysis-ESF Surface Design Package ID  

SciTech Connect

The purpose of the fire hazard analysis is to comprehensively assess the risk from fire within the individual fire areas. This document will only assess the fire hazard analysis within the Exploratory Studies Facility (ESF) Design Package ID, which includes the fuel storage system area of the North Portal facility, and evaluate whether the following objectives are met: 1.1.1--This analysis, performed in accordance with the requirements of this document, will satisfy the requirements for a fire hazard analysis in accordance with U.S. Department of Energy (DOE) Order 5480.7A. 1.1.2--Ensure that property damage from fire and related perils does not exceed an acceptable level. 1.1.3--Provide input to the ESF Basis For Design (BFD) Document. 1.1.4 Provide input to the facility Safety Analysis Report (SAR) (Paragraph 3.8).

N.M. Ruonavaara

1995-01-18T23:59:59.000Z

419

Towards Palm-Size Autonomous Helicopters  

Science Conference Proceedings (OSTI)

muFly EU project started in 2006 with the idea to build an autonomous micro helicopter, comparable in size and weight to a small bird. Several scientific and technological objectives were identified. This spanned from system-level integration, high efficiency ... Keywords: Graph based SLAM, Micro actuators, Micro helicopter, Multi-directional triangulation

Samir Bouabdallah; Christian Bermes; Slawomir Grzonka; Christiane Gimkiewicz; Alain Brenzikofer; Robert Hahn; Dario Schafroth; Giorgio Grisetti; Wolfram Burgard; Roland Siegwart

2011-01-01T23:59:59.000Z

420

Modeling Maximum Hail Size in Alberta Thunderstorms  

Science Conference Proceedings (OSTI)

A one-dimensional steady-state cloud model was combined with a time-dependent hail growth model to predict the maximum hailstone size on the ground. Model runs were based on 160 proximity soundings recorded within the Alberta Hail Project area ...

Julian C. Brimelow; Gerhard W. Reuter; Eugene R. Poolman

2002-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental Science and Research Foundation annual technical report to DOE-ID, January , 1995--December 31, 1995  

Science Conference Proceedings (OSTI)

The foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain and provide environmental education and support services related to INEL natural resource issues. Also, the foundation, with its university affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including waste management, environmental restoration, spent nuclear fuels, and land management issues. Major accomplishments during CY1995 can be divided into five categories: environmental surveillance program, environmental education, environmental services and support, ecological risk assessment, and research benefitting the DOE-ID mission.

NONE

1996-06-01T23:59:59.000Z

422

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

423

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

424

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

425

Project 364  

NLE Websites -- All DOE Office Websites (Extended Search)

765-494-5623 lucht@purdue.edu DEVELOPMENT OF NEW OPTICAL SENSORS FOR MEASUREMENT OF MERCURY CONCENTRATIONS, SPECIATION, AND CHEMISTRY Project Description The feasibility of...

426

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State...

427

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

428

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

429

Project 283  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ 07039 973-535 2328 ArchieRobertson@fwc.com Sequestration ADVANCED CO 2 CYCLE POWER GENERATION Background This project will develop a conceptual power plant design...

430

Project 197  

NLE Websites -- All DOE Office Websites (Extended Search)

will bring economic value to both the industrial customers and to the participating companies. * Complete project by June 2006. Accomplishments A ceramic membrane and seal...

431

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

432

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Interdisciplinary Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford...

433

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

434

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* Concrete products in this project * Standard 8" concrete blocks * Standard 4' x 8' fiber-cement boards CO 2 The Goals * Maximizing carbon uptake by carbonation (at least...

435

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Evaluating Potential Groundwater Impacts and Natural Geochemical...

436

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

437

Project 252  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Global Climate Energy Project Terralog Technologies TransAlta University of Alaska Fairbanks Washington State Department of Natural Resources Western Interstate...

438

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

439

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

mechanistic insights 5 Project Overview: Scope of work * Task 1 - Pipeline and Casing Steel Corrosion Studies * Evaluate corrosion behavior of pipeline steels in CO 2 mixtures...

440

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* This project pinpoints the critical catalyst features necessary to promote carbon dioxide conversion to acrylate, validate the chemical catalysis approach, and develop an...

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources...

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number...

444

LOGGING IN TO UI-INTEGRATE SELF-SERVICE First-time users must get their Enterprise ID and Enterprise ID Password before logging in to UI-Integrate  

E-Print Network (OSTI)

screen allows you to enter multiple search criteria to narrow your search. Click "Submit" at the bottom the Urbana-Champaign campus. #12;2 2. Once you have selected your campus, enter your Enterprise ID or seniors). · Curriculum (your degree, college, major). 7. To begin registration, Select a Term. Select

Anastasio, Thomas J.

445

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, Rev 0 4, Rev 0 I. Project Title: MSA Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B, 83.6 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification, operation, and decommissioning of facilities for small-scale research and development projects; conventional laboratory operations; and small-scale pilot projects frequently conducted to verify a concept before demonstration actions, provided that

446

Microsoft Word - DOE-ID-INL-09-001redo.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: SMC Dial Room SECTION B. Project Description The purpose of this project is to design and construct a new "Specific Manufacturing Capability (SMC) Dial Room" (and to procure/install communications equipment) inside the SMC security controlled area. The project will replace an existing dial room in Test Area North (TAN)-601, which is located at the Test Support Facility (TSF) area of TAN and outside SMC control. Because of the requirement for constant use of the voice and data transfer equipment in TAN 601, the project plan is to duplicate the existing equipment in TAN 601, and use TAN 601, until the new SMC Dial Room is on-line. The project is to design/specify data and voice transfer equipment, construct a facility to house the equipment, procure and install all

447

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

448

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

449

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

450

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

451

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

452

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

453

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

454

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

455

Analysis and evaluation of processes and equipment in Tasks II and IV of the Low-Cost Solar Array Project. Quarterly report, April-July 1978  

DOE Green Energy (OSTI)

The significant economic data for the current production multiblade wafering and inner diameter slicing processes were tabulated and compared to data on the experimental and projected Varian multiblade slurry, STC ID diamond coated blade, Yasunaga multiwire slurry and Crystal Systems fixed abrasive multiwire slicing methods. Cost calculations were performed for current production processes and for 1982 and 1986 projected wafering techniques.

Goldman, H.; Wolf, M.

1978-11-01T23:59:59.000Z

456

Microsoft Word - DOE-ID-13-077 Clemson EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale Characterization and Validation of Formation and Stability of Helium Bubbles in Nano-structured Ferritic Alloys under Irradiation - Clemson University SECTION B. Project...

457

Microsoft Word - DOE-ID-INL-13-004 R1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

or Waste Handling and Transportation: Project personnel would work with Waste Generator Services (WGS) to properly package and transport regulated, hazardous or radioactive...

458

Microsoft Word - DOE-ID-12-026 Illinois Tech.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

the university. This project limits the allowed radioactive materials to uranium and thorium compounds. All samples will be returned to the researchers' host institution for...

459

Microsoft Word - DOE-ID-13-021 Stony Brook EC B3-6.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 SECTION A. Project Title: Self-powered Wireless Dual-mode Langasite Sensor for PressureTemperature Monitoring of Nuclear Reactors - The Research Foundation of State University...

460

Microsoft Word - DOE-ID-12-018 Texas.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Implementation of a Low-Level Gamma-Ray Counting Facility - University of Texas at Austin SECTION B. Project Description The prime objective of this University of...

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Evolution of the U.S. Energy Service Company Industry: Market Size and  

E-Print Network (OSTI)

Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from of the U.S. Energy Service Company Industry: Market Size and Project Performance from 19902008. LBNL5447E · Overview of U.S. ESCO Industry · Typical Performance of Projects and Market Activity · Projectlevel Trends

462

Proceedings of the 2008 International Conference on Electrical Machines Paper ID 1434 DFIG-Based Wind Turbine Fault Diagnosis  

E-Print Network (OSTI)

Proceedings of the 2008 International Conference on Electrical Machines Paper ID 1434 DFIG for electrical and mechanical fault diagnosis in a DFIG-based wind turbine. The investigated technique Generator (DFIG), Discrete Wavelet Transform (DWT), fault diagnosis. I. INTRODUCTION Wind energy conversion

Paris-Sud XI, Université de

463

NJ WY AK AL CA AR CO CT DE FL GA HI ID KS IL IN IA IA KY LA  

Gasoline and Diesel Fuel Update (EIA)

176, "Annual Report of Natural and Supplemental Gas Supply and Disposition." NJ WY AK AL CA AR CO CT DE FL GA HI ID KS IL IN IA IA KY LA ME MI MA MD MN MS MT MO NE ND OH NV NM NY...

464

ABSTRACT FINAL ID: PP21D-03; TITLE: Quantifying Kinetic Isotope Effect in Speleothems Through Clumped and Oxygen  

E-Print Network (OSTI)

ABSTRACT FINAL ID: PP21D-03; TITLE: Quantifying Kinetic Isotope Effect in Speleothems Through Clumped and Oxygen Isotopes in Laboratory Precipitation Experiments SESSION TYPE: Oral SESSION TITLE: PP21 INSTITUTIONS (ALL): 1. Dept. of Geology & Geophysics, Yale University, New Haven, CT, United States. 2. Inst

465

SC Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Projects Print Text Size: A A A RSS Feeds FeedbackShare Page SC Projects-Contains information regarding SC projects including project review dates, information on Office of Science Certified Federal Project Directors and Defining the Leadership Traits/Skill Set for a Successful Federal Project Director, and project photos or links to project photo sites. Last modified: 3/18/2013 10:54:36

466

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

467

Land animal sizes  

NLE Websites -- All DOE Office Websites (Extended Search)

Land animal sizes Name: tamar c Status: NA Age: NA Location: NA Country: NA Date: Around 1993 Question: Why are today's land mammals so much smaller than prehistoric mammals?...

468

ARM - Measurement - Hydrometeor size  

NLE Websites -- All DOE Office Websites (Extended Search)

size size ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Hydrometeor size The size of a hydrometeor, measured directly or derived from other measurements . Categories Cloud Properties Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those recorded for diagnostic or quality assurance purposes. ARM Instruments DISDROMETER : Impact Disdrometer LDIS : Laser Disdrometer External Instruments CPOL : C-Band Polarimetric Radar Field Campaign Instruments EC-CONVAIR580-BULK : Environment Canada Convair 580 Bulk Parameters

469

Multimodal Raindrop Size Distributions  

Science Conference Proceedings (OSTI)

The raindrop size distributions (DSDs) observed over a short span usually have an erratic shape, with several relative maxima. This multimodal structure is studied from disdrometer data acquired in tropical and midlatitude areas. It is shown that ...

Henri Sauvageot; Manlandon Koffi

2000-08-01T23:59:59.000Z

470

Raindrop Size Distribution  

Science Conference Proceedings (OSTI)

This paper reviews some of the published results relating to raindrop-size distributions and couples this with some of the authors' results in order to show that the mathematical description of the distribution can be divided into three ...

M. C. Hodson

1986-07-01T23:59:59.000Z

471

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

472

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

473

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

474

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

475

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

476

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

477

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER June 29, 2011 - 12:00pm Addthis Media Contact Brad Bugger (208) 526-0833 Idaho Falls, ID - The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and government engineering and management, including an eight month stint as acting Deputy Manager for EM. He has extensive experience in business management associated with program planning, development and administration. His experience includes all project phases from conceptual planning, cost and

478

Microsoft Word - DOE-ID-INL-12-008 _INL-12-032_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area SECTION B. Project Description: Provide a brief but thorough description of the project or action, including the type of action (for example, new activity or facility, construction, process or facility modification, maintenance, research and development, work for others), description of activities, work phases, location of work activity (include a map or diagram, if appropriate), purpose and need (what is the activity and why is it being performed), projected start and end dates and the approximate project costs. Environmental Checklist (EC) INL-09-084 disclosed the environmental aspects and work activities associated with the construction of a 100 ft. x 150 ft. asphalt pad in the northwest corner of the Advanced Test Reactor (ATR) Complex identified as the TRA-1710

479

Microsoft Word - DOE-ID-INL-12-008 _INL-12-032_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area SECTION B. Project Description: Provide a brief but thorough description of the project or action, including the type of action (for example, new activity or facility, construction, process or facility modification, maintenance, research and development, work for others), description of activities, work phases, location of work activity (include a map or diagram, if appropriate), purpose and need (what is the activity and why is it being performed), projected start and end dates and the approximate project costs. Environmental Checklist (EC) INL-09-084 disclosed the environmental aspects and work activities associated with the construction of a 100 ft. x 150 ft. asphalt pad in the northwest corner of the Advanced Test Reactor (ATR) Complex identified as the TRA-1710

480

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

Note: This page contains sample records for the topic "id project size" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

482

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

483

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural- Genetic Algorithm Project DE FE0009284 Boyun Guo, Ph.D. University of...

484

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

485

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

486

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

487

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

488

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

489

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

490

LUCF Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

491

Project 265  

NLE Websites -- All DOE Office Websites (Extended Search)

The goal of this project is to develop an on-line instrument using multi- wavelength lasers that is capable of characterizing particulate matter (PM) generated in fossil energy...

492

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

"Carbonsheds" as a Framework for Optimizing US CCS Pipeline Transport on a Regional to National Scale DOE-ARRA Project Number DE-FE0001943 Lincoln Pratson Nicholas School of the...

493

Project 114  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototech Company SRI International Kellogg, Brown, and Root ChevronTexaco Sd-Chemie, Inc. COST Total Project Value 20,320,372 DOENon-DOE Share 15,326,608 4,993,764...

494

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

495

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

496

Project 134  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Goal To demonstrate a "whole plant" approach using by-products from a coal-fired power plant to sequester carbon in an easily quantifiable and verifiable form. Objectives...

497

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

498

Project 310  

NLE Websites -- All DOE Office Websites (Extended Search)

carbohydrate generated from agricultural enterprises in the U.S., such as corn wet-milling. This project is studying the production of a suite of specialty chemicals by...

499

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

G., 2011, Design and package of a 14CO2 field analyzer: the Global Monitor Platform (GMP). Proceedings of SPIE, v 8156, p. 81560E 17 DOE-NETL PROJECT REVIEW MEETING 08-21-2012...

500

Project 297  

NLE Websites -- All DOE Office Websites (Extended Search)

of this project is to utilize pure oxygen at a feed rate of less than 10% of the stoichiometric requirement in demonstrating the use of oxygen-enhanced combustion in meeting...