Sample records for iaea project database1

  1. Project plan international atomic energy agency (IAEA) safeguards project plutonium finishing plant

    SciTech Connect (OSTI)

    BARTLETT, W.D.

    1999-05-13T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) International Atomic Energy Agency (IAEA) project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the PFP Integrated Project Management Plan (PMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for the PFP IAEA project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the IAEA project. Any deviations to the document must be authorized through the appropriate change control process.

  2. Project Management Plan (PMP) for International Atomic Energy Agency (IAEA) Safeguards Project

    SciTech Connect (OSTI)

    BARTLETT, W.D.

    1999-09-14T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the PFP IAEA project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP) HNF-3617 Rev 0.

  3. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    SciTech Connect (OSTI)

    Braams, B. J.; Chung, H.-K. [Nuclear Data Section, NAPC Division, International Atomic Energy Agency, P. O. Box 100, Vienna International Centre, A-1400 Vienna (Austria)

    2011-05-11T23:59:59.000Z

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  4. International Atomic Energy Agency (IAEA) Coordinated Research Projects on Structural Integrity of Reactor Pressure Vessels

    SciTech Connect (OSTI)

    Server, W. L. [ATI Consulting, Pinehurst, NC; Nanstad, Randy K [ORNL

    2009-01-01T23:59:59.000Z

    The International Atomic Energy Agency (IAEA) has conducted a series of Coordinated Research Projects (CRPs) that have focused on irradiated reactor pressure vessel (RPV) steel fracture toughness properties and approaches for assuring structural integrity of RPVs throughout operating life. A series of nine CRPs have been sponsored by the IAEA, starting in the early 1970s, focused on neutron radiation effects on RPV steels. The purpose of the CRPs was to develop comparisons and correlations to test the uniformity of irradiated results through coordinated international research studies and data sharing. Consideration of dose rate effects, effects of alloying (nickel, manganese, silicon, etc.) and residual elements (eg., copper and phosphorus), and drop in upper shelf toughness are also important for assessing neutron embrittlement effects. The ultimate use of embrittlement understanding is assuring structural integrity of the RPV under current and future operation and accident conditions. Material fracture toughness is the key ingredient needed for this assessment, and many of the CRPs have focused on measurement and application of irradiated fracture toughness. This paper presents an overview of the progress made since the inception of the CRPs in the early 1970s. The chronology and importance of each CRP have been reviewed and put into context for continued and long-term safe operation of RPVs.

  5. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    SciTech Connect (OSTI)

    Braams, Bastiaan J.; Chung, Hyun-Kyung [Nuclear Data Section, NAPC Division, International Atomic Energy Agency P. O. Box 100, Vienna International Centre, AT-1400 Vienna (Austria)

    2012-05-25T23:59:59.000Z

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint work towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.

  6. Fuel Cycle Analysis Framework Base Cases for the IAEA/INPRO GAINS Collaborative Project

    SciTech Connect (OSTI)

    Brent Dixon

    2012-09-01T23:59:59.000Z

    Thirteen countries participated in the Collaborative Project GAINS “Global Architecture of Innovative Nuclear Energy Systems Based on Thermal and Fast Reactors Including a Closed Fuel Cycle”, which was the primary activity within the IAEA/INPRO Program Area B: “Global Vision on Sustainable Nuclear Energy” for the last three years. The overall objective of GAINS was to develop a standard framework for assessing future nuclear energy systems taking into account sustainable development, and to validate results through sample analyses. This paper details the eight scenarios that constitute the GAINS framework base cases for analysis of the transition to future innovative nuclear energy systems. The framework base cases provide a reference for users of the framework to start from in developing and assessing their own alternate systems. Each base case is described along with performance results against the GAINS sustainability evaluation metrics. The eight cases include four using a moderate growth projection and four using a high growth projection for global nuclear electricity generation through 2100. The cases are divided into two sets, addressing homogeneous and heterogeneous scenarios developed by GAINS to model global fuel cycle strategies. The heterogeneous world scenario considers three separate nuclear groups based on their fuel cycle strategies, with non-synergistic and synergistic cases. The framework base case analyses results show the impact of these different fuel cycle strategies while providing references for future users of the GAINS framework. A large number of scenario alterations are possible and can be used to assess different strategies, different technologies, and different assumptions about possible futures of nuclear power. Results can be compared to the framework base cases to assess where these alternate cases perform differently versus the sustainability indicators.

  7. Progress and status of the IAEA coordinated research project: production of Mo-99 using LEU fission or neutron activation

    SciTech Connect (OSTI)

    Goldman, Ira N.; Adelfang, Pablo [Division of Nuclear Fuel Cycle and Waste Technology, International Atomic Energy Agency, Wagramer Strasse 5, P.O. Box 100, A-1400 Vienna (Austria)], E-mail: I.Goldman@iaea.org, E-mail: P.Adelfang@iaea.org; Ramamoorthy, Natesan [Division of Physical and Chemical Sciences, International Atomic Energy Agency, Wagramer Strasse 5, P.O. Box 100, A-1400 Vienna (Austria)], E-mail: N.Ramamoorthy@iaea.org

    2008-07-15T23:59:59.000Z

    Since late 2004, the IAEA has developed and implemented a Coordinated Research Project (CRP) to assist countries interested in initiating indigenous, small-scale production of Mo-99 to meet local nuclear medicine requirements. The objective of the CRP is to provide interested countries with access to non-proprietary technologies and methods to produce Mo-99 using LEU foil or LEU mini-plate targets, or for the utilization of n,gamma neutron activation, e.g. through the use of gel generators. The project has made further progress since the RERTR 2006 meeting, with a Technical Workshop on Operational Aspects of Mo99 Production held 28-30 November 2006 in Vienna and the Second Research Coordination Meeting held in Bucharest, Romania 16-20 April 2007. The paper describes activities carried out as noted above, and as well as the provision of LEU foils to a number of participants, and the progress by a number of groups in preparing for LEU target assembly and disassembly, irradiation, chemical processing, and waste management. The participants' progress in particular on thermal hydraulics computations required for using LEU targets is notable, as also the progress in gel generator plant operations in India and Kazakhstan. Poland has joined as a new research agreement holder and an application by Egypt to be a contract holder is undergoing internal review in the IAEA and is expected to be approved. The IAEA has also participated in several open meetings of the U.S. National Academy of Sciences Study on Producing Medical Radioisotopes without HEU, which will also be discussed in the paper. (author)

  8. Considerations Related To Human Intrusion In The Context Of Disposal Of Radioactive Waste-The IAEA HIDRA Project

    SciTech Connect (OSTI)

    Seitz, Roger; Kumano, Yumiko; Bailey, Lucy; Markley, Chris; Andersson, Eva; Beuth, Thomas

    2014-01-09T23:59:59.000Z

    The principal approaches for management of radioactive waste are commonly termed ‘delay and decay’, ‘concentrate and contain’ and ‘dilute and disperse’. Containing the waste and isolating it from the human environment, by burying it, is considered to increase safety and is generally accepted as the preferred approach for managing radioactive waste. However, this approach results in concentrated sources of radioactive waste contained in one location, which can pose hazards should the facility be disrupted by human action in the future. The International Commission on Radiological Protection (ICRP), International Atomic Energy Agency (IAEA), and Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA) agree that some form of inadvertent human intrusion (HI) needs to be considered to address the potential consequences in the case of loss of institutional control and loss of memory of the disposal facility. Requirements are reflected in national regulations governing radioactive waste disposal. However, in practice, these requirements are often different from country to country, which is then reflected in the actual implementation of HI as part of a safety case. The IAEA project on HI in the context of Disposal of RadioActive waste (HIDRA) has been started to identify potential areas for improved consistency in consideration of HI. The expected outcome is to provide recommendations on how to address human actions in the safety case in the future, and how the safety case may be used to demonstrate robustness and optimize siting, design and waste acceptance criteria within the context of a safety case.

  9. IAEA FEC Saint Petersburg, Russia, 13-18 October 2014, O. Motojima The ITER Project Construction Status

    E-Print Network [OSTI]

    Regulation/QA Quality Control #12;IAEA FEC Saint Petersburg, Russia, 13-18 October 2014, O. Motojima Slide 3 advances in modelling of physics processes underlying ELMs and ELM control Development of physics basis plasma fusion performance Design of advanced plasma control system progressing Integrated modelling

  10. IAEA Coordinated Research Project on Master Curve Approach to Monitor Fracture Toughness of RPV Steels: Final Results of the Experimental Exercise to Support Constraint Effects

    SciTech Connect (OSTI)

    Nanstad, Randy K [ORNL] [ORNL

    2009-01-01T23:59:59.000Z

    The precracked Charpy single-edge notched bend, SE(B), specimen (PCC) is the most likely specimen type to be used for determination of the reference temperature, T0, with reactor pressure vessel (RPV) surveillance specimens. Unfortunately, for many RPV steels, significant differences have been observed between the T0 temperature for the PCC specimen and that obtained from the 25-mm thick compact specimen [1TC(T)], generally considered the standard reference specimen for T0. This difference in T0 has often been designated a specimen bias effect, and the primary focus for explaining this effect is loss of constraint in the PCC specimen. The International Atomic Energy Agency (IAEA) has developed a coordinated research project (CRP) to evaluate various issues associated with the fracture toughness Master Curve for application to light-water RPVs. Topic Area 1 of the CRP is focused on the issue of test specimen geometry effects, with emphasis on determination of T0 with the PCC specimen and the bias effect. Topic Area 1 has an experimental part and an analytical part. Participating organizations for the experimental part of the CRP performed fracture toughness testing of various steels, including the reference steel JRQ (A533-B-1) often used for IAEA studies, with various types of specimens under various conditions. Additionally, many of the participants took part in a round robin exercise on finite element modeling of the PCVN specimen, discussed in a separate paper. Results from fracture toughness tests are compared with regard to effects of specimen size and type on the reference temperature T0. It is apparent from the results presented that the bias observed between the PCC specimen and larger specimens for Plate JRQ is not nearly as large as that obtained for Plate 13B (-11 C vs -37 C) and for some of the results in the literature (bias values as much as -45 C). This observation is consistent with observations in the literature that show significant variations in the bias that are dependent on the specific materials being tested. There are various methods for constraint adjustments and two methods were used that reduced the bias for Plate 13B from -37 C to -13 C in one case and to -11 C in the second case. Unfortunately, there is not a consensus methodology available that accounts for the differences observed with different materials. Increasing the Mlim value in the ASTM E-1921 to ensure no loss of constraint for the PCC specimen is not a practicable solution because the PCC specimen is derived from CVN specimens in RPV surveillance capsules and larger specimens are normally not available. Resolution of these differences are needed for application of the master curve procedure to operating RPVs, but the research needed for such resolution is beyond the scope of this CRP.

  11. agency iaea update: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  12. agency iaea safeguards: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  13. agency iaea initiative: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  14. assessments iaea initiatives: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  15. agency iaea activities: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  16. agency iaea initiatives: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: IAEA-TECDOC-1403 The long term stabilization of uranium mill tailings Final report of a co-ordinated research project 2000-2004 August 2004...

  17. 2011 IAEA General Conference

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHE U.S.Energy MoreEnergyEnergyWednesday, May011 IAEA

  18. Safety-Related Activities of the IAEA for Radioactive Waste, Decommissioning and Remediation - 13473

    SciTech Connect (OSTI)

    Hahn, Pil-Soo; Vesterlind, Magnus [Division of Radiation, Transport and Waste Safety, International Atomic Energy Agency, PO Box 100, A-1400 Vienna (Austria)] [Division of Radiation, Transport and Waste Safety, International Atomic Energy Agency, PO Box 100, A-1400 Vienna (Austria)

    2013-07-01T23:59:59.000Z

    To fulfil its mandate and serve the needs of its Member States, the IAEA is engaged in a wide range of safety-related activities pertaining to radioactive waste management, decommissioning and remediation. One of the statutory obligations of the IAEA is to establish safety standards and to provide for the application of these standards. The present paper describes recent developments in regard to the IAEA's waste safety standards, and some of the ways the IAEA makes provision for their application. The safety standards and supporting safety demonstration projects seek to establish international consensus on methodologies and approaches for dealing with particular subject areas, for example, safety assessment for radioactive waste disposal. (authors)

  19. IAEA-TECDOC-1403 The long term stabilization of

    E-Print Network [OSTI]

    of names of specific companies or products (whether or not indicated as registered) does not imply any assist Member States with the development, implementation, maintenance and continuous improvement the disposal of uranium mill tailings, the IAEA developed a co-ordinated research project (CRP) in this area

  20. The US Support program to IAEA Safeguards - 2008

    SciTech Connect (OSTI)

    Pepper,S.

    2008-06-09T23:59:59.000Z

    The U.S. Support Program to IAEA Safeguards (USSP) was established in 1977 to provide technical assistance to the IAEA Department of Safeguards. Since that time the U.S. Department of State has provided funding of over $200 million and over 900 tasks have been completed by USSP contractors on behalf of the KEA. The USSP is directed by a U.S. interagency subcommittee known as the Subgroup on Safeguards Technical Support (SSTS) and is managed by the International Safeguards Project Office (ISPO) at Brookhaven National Laboratory. In recent years, the SSTS and ISPO have identified priorities to guide the process of determining which IAEA requests are aligned with US. policy and will be funded. The USSP priorities are reviewed and updated prior to the USSP Annual Review Meeting which is hosted by the International Atomic Energy Agency (IAEA) each spring in Vienna, Austria. This paper will report on the 2008 USSP priorities and be an introduction for a session which will consist of four papers on USSP priorities and four other papers related to USSP activities.

  1. IAEA reorganizes nuclear information services

    SciTech Connect (OSTI)

    Levine, E.

    2012-08-15T23:59:59.000Z

    As part of an overall restructuring of the International Atomic Energy Agency's Department of Nuclear Energy, the agency has established the Nuclear Information Section (NIS). The restructuring, recently announced by IAEA Director General Yukiya Amano, also includes the creation of a separate Nuclear Knowledge Management (NKM) Section, as demand for assistance in this area is growing among member countries. According to the NIS Web site, 'This restructuring and the creation of the NIS provides an opportunity for further enhancing existing information products and services and introducing new ones-all with an eye towards advancing higher organizational efficiency and effectiveness.'

  2. Four Years of Practical Arrangements between IAEA and Moscow SIA 'Radon': Preliminary Results - 13061

    SciTech Connect (OSTI)

    Batyukhnova, O.G.; Karlina, O.K.; Neveikin, P.P. [SUE SIA 'Radon', The 7-th Rostovsky Lane 2/14, Moscow, 119121 (Russian Federation)] [SUE SIA 'Radon', The 7-th Rostovsky Lane 2/14, Moscow, 119121 (Russian Federation)

    2013-07-01T23:59:59.000Z

    The International Education Training Centre (IETC) at Moscow State Unitary Enterprise Scientific and Industrial Association 'Radon' (SIA 'Radon'), in co-operation with the International Atomic Energy Agency (IAEA), has developed expertise and provided training to waste management personnel for the last 15 years. Since 1997, the educational system of the enterprise with the support of the IAEA has acquired an international character: more than 470 experts from 35 countries- IAEA Member States completed the professional development. Training is conducted at various thematic courses or fellowships for individual programs and seminars on IAEA technical projects. In June 2008 a direct agreement (Practical Arrangements) was signed between SIA 'Radon' and the IAEA on cooperation in the field of development of new technologies, expert's advice to IAEA Member States, and, in particular, the training of personnel in the field of radioactive waste management (RWM), which opens up new perspectives for fruitful cooperation of industry professionals. The paper summarizes the current experience of the SIA 'Radon' in the organization and implementation of the IAEA sponsored training and others events and outlines some of strategic educational elements, which IETC will continue to pursue in the coming years. (authors)

  3. The IAEA and Control of Radioactive SourcesThe

    SciTech Connect (OSTI)

    Dodd, B.

    2004-10-03T23:59:59.000Z

    This presentation discusses the International Atomic Energy Agency (IAEA) and the control of radioactive sources.

  4. IAEA Safeguards: Past, Present, and Future

    SciTech Connect (OSTI)

    Santi, Peter A. [Los Alamos National Laboratory; Hypes, Philip A. [Los Alamos National Laboratory

    2012-06-14T23:59:59.000Z

    This talk will present an overview of the International Atomic Energy Agency with a specific focus on its international safeguards mission and activities. The talk will first present a brief history of the IAEA and discuss its current governing structure. It will then focus on the Safeguards Department and its role in providing assurance that nuclear materials are being used for peaceful purposes. It will then look at how the IAEA is currently evolving the way in which it executes its safeguards mission with a focus on the idea of a state-level approach.

  5. The U.S. Support Program to IAEA Safeguards - How It Works

    SciTech Connect (OSTI)

    Nock,C.; Hoffheins,B.

    2008-07-13T23:59:59.000Z

    The U.S. Support Program to International Atomic Energy Agency (IAEA) Safeguards (USSP) was established in 1977 to transfer US technology and expertise to assist the IAEA Department of Safeguards because its limited budget and scope would not allow for R&D activities and the procurement of specialized or customized equipment. Over the years, the USSP and the Department of Safeguards have worked together continuously to develop and improve processes for requesting, selecting, and managing projects that support the Safeguards verification mission. This paper will discuss the main USSP processes for accepting and processing Safeguards requests, and managing and reporting task progress.

  6. Approach to IAEA material-balance verification with intermittent inspection at the Portsmouth Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.

    1984-05-18T23:59:59.000Z

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP) for the circumstance in which the IAEA inspections occur on an intermittent basis. The verification approach is a variation of the standard IAEA attributes/variables measurement-verification method. This alternative approach is useful and applicable at the Portsmouth GCEP, which will ship all its product and tails UF/sub 6/ to United States facilities not eligible for IAEA safeguards. The paper reviews some of the relevant results of the Hexapartite Safeguards Project (HSP), describes the standard IAEA material-balance-verification approach for bulk-handling facilities, and provides the procedures to be followed in handling and processing UF/sub 6/ cylinders at the Portsmouth GCEP. The paper then discusses the assumptions made in the approach, and derives a formula for the probability with which the IAEA could detect the diversion of a significant quantity of uranium (75 kg of U-235 in depleted, normal, and low-enriched uranium) if this method were applied. The paper also provides numerical examples of IAEA detection probability should the operator divert uranium from the feed, product, or tails streams for the Portsmouth GCEP with a capacity of 1100 tonnes of separative work per year.

  7. Microsoft PowerPoint - Preparing for IAEA Data Reporting (10...

    National Nuclear Security Administration (NNSA)

    URENCO Limited Preparing for IAEA Data Reporting (10 CFR 75) 1 Carol Wormington - URENCO USA Preparing for IAEA Data Reporting (10 CFR 75) * We were YKO, an NRC Licensee 2 * YKO...

  8. PROGRESSIVE CLASSIFICATION IN THE COMPRESSED DOMAIN FOR LARGE EOS SATELLITE DATABASES1

    E-Print Network [OSTI]

    Kontoyiannis, Ioannis

    PROGRESSIVE CLASSIFICATION IN THE COMPRESSED DOMAIN FOR LARGE EOS SATELLITE DATABASES1 Vittorio and Signal Processing, Atlanta, GA, May 1996. ABSTRACT We introduce a new framework for classifying large-by-pixel approach. This approach, called progressive classi cation, is well suited for analyzing large images

  9. PROGRESSIVE CLASSIFICATION IN THE COMPRESSED DOMAIN FOR LARGE EOS SATELLITE DATABASES 1

    E-Print Network [OSTI]

    Kontoyiannis, Ioannis

    PROGRESSIVE CLASSIFICATION IN THE COMPRESSED DOMAIN FOR LARGE EOS SATELLITE DATABASES 1 Vittorio for classifying large images that is more accurate and less computationally expensive than the classical pixel­by­pixel approach. This approach, called progressive classification, is well suited for analyzing large images

  10. NGSI: IAEA Verification of UF6 Cylinders

    SciTech Connect (OSTI)

    Curtis, Michael M.

    2012-06-05T23:59:59.000Z

    The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

  11. The US Support Program Assistance to the IAEA Safeguards Information Technology, Collection, and Analysis 2008

    SciTech Connect (OSTI)

    Tackentien,J.

    2008-06-12T23:59:59.000Z

    One of the United States Support Program's (USSP) priorities for 2008 is to support the International Atomic Energy Agency's (IAEA) development of an integrated and efficient safeguards information infrastructure, including reliable and maintainable information systems, and effective tools and resources to collect and analyze safeguards-relevant information. The USSP has provided funding in support of this priority for the ISIS Re-engineering Project (IRP), and for human resources support to the design and definition of the enhanced information analysis architecture project (nVision). Assistance for several other information technology efforts is provided. This paper will report on the various ongoing support measures undertaken by the USSP to support the IAEA's information technology enhancements and will provide some insights into activities that the USSP may support in the future.

  12. Chad-IAEA Cooperation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpenadd: China DatangCentralCereale Brasil JumpCetrelChad-IAEA

  13. IAEA National Statement | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers3.pdf0-45.pdf0 BudgetGoalsHealthHow toHydrothermal Photo5 ,IAEA National

  14. Microsoft PowerPoint - IAEA Safeguards Reporting Requirements...

    National Nuclear Security Administration (NNSA)

    information be reported for facilities selected by the IAEA under the Agreement * URENCO USA, Eunice, NM (enrichment facility) - no facility attachment * AREVA, Richland, WA (fuel...

  15. IAEA-CN-SO/G-I-l THE NET PROJECT

    E-Print Network [OSTI]

    and operating requirements of a reactor, i.e.: self-sustained DT thermonuclear reactions; extended bum, possibly design and operating requirements of a reactor, i.e. : - Self-sustained DT thermonuclear reaction

  16. Technology recommendations for pre-screening of IAEA swipe samples

    SciTech Connect (OSTI)

    Steeb, Jennifer L.; Smith, Nicholas A.; Lee, Denise L.; Huckabay, Heath A.; Ticknor, Brian W.

    2015-01-01T23:59:59.000Z

    Argonne and Oak Ridge National Laboratories have prepared an analysis of recommended, possible, and not recommended technologies for pre-screening and prioritizing IAEA swipes. The analytical techniques listed under the recommended technology list are the most promising techniques available to date. The recommended list is divided into two sections: Argonne’s recommended techniques and Oak Ridge’s recommended techniques. This list was divided based upon the expertise of staff in each subject area and/or the instrumentation available at each laboratory. The following section, titled Possible Techniques, is a list of analytical techniques that could be used for pre-screening and prioritizing swipes if additional instrumentation and effort were provided. These techniques are not necessarily top priority, but should not be discounted for future or expanded efforts. Lastly, a list of not recommended techniques is provided to outline the analytical methods and instrumentation that were investigated by each lab but deemed not suitable for this task. In addition to the recommendation list, a short procedure is provided outlining the steps followed for destructive analysis by the Network of Analytical Laboratories (NWAL) for determination of uranium concentrations, isotopic content of sample and swipe. Swipes generated for this project will be given to ORNL’s NWAL laboratory for analysis after analysis by other techniques at both laboratories.

  17. International Workshops to Foster Implementation of the IAEA Additional Protocol

    SciTech Connect (OSTI)

    Killinger, Mark H.; Coates, Cameron W.; Bedke, Michael L.

    2003-07-14T23:59:59.000Z

    A country’s adherence to the International Atomic Energy Agency’s (IAEA) Additional Protocol is an important statement to the world of that country’s commitment to nuclear nonproliferation. Without the Additional Protocol (AP) it is possible, as demonstrated in Iraq, for a country party to the Non-Proliferation Treaty (NPT) to clandestinely work toward nuclear weapons and be undetected by the IAEA. This is because classical safeguards under the NPT are directed at diversion of nuclear material from declared activities. But a country may instead build undeclared activities to produce weapons-grade nuclear material. The AP is directed at detecting those undeclared activities. As of May 2003, 73 countries had signed the AP, but only 35 have entered into force. To further adherence to the AP, the IAEA has held regional, high-level seminars in Japan, South Africa, Kazakhstan, Peru, Romania, and Malaysia to explain AP provisions. To supplement these policy-level seminars, the U.S. Department of Energy (DOE) has undertaken to develop a set of modules of technical competencies required to implement the AP. The intent is to work closely with the IAEA by providing these technical competencies to countries as well as to complement the IAEA’s regional seminars and other outreach efforts. This paper briefly describes the technical competency modules.

  18. RELAP5 posttest calculation of IAEA-SPE-4

    SciTech Connect (OSTI)

    Petelin, S.; Mavko, B.; Parzer, I.; Prosek, A.

    1994-12-31T23:59:59.000Z

    The International Atomic Energy Agency`s Fourth Standard Problem Exercise (IAEA-SPE-4) was performed at the PMK-2 facility. The PMK-2 facility is designed to study processes following small- and medium-size breaks in the primary system and natural circulation in VVER-440 plants. The IAEA-SPE-4 experiment represents a cold-leg side small break, similar to the IAEA-SPE-2, with the exception of the high-pressure safety injection being unavailable, and the secondary side bleed and feed initiation. The break valve was located at the dead end of a vertical downcomer, which in fact simulates a break in the reactor vessel itself, and should be unlikely to happen in a real nuclear power plant (NPP). Three different RELAP5 code versions were used for the transient simulation in order to assess the calculations with test results.

  19. A brief history of NDA at the IAEA.

    SciTech Connect (OSTI)

    Sprinkle, J. K. (James K.); Sinkule, B. J. (Barbara J.); Hsue, S.-T. (Sin-Tao); Abhold, M. E. (Mark E.)

    2001-01-01T23:59:59.000Z

    Nearly 30 years ago, the first portable nondestructive assay instrument, a SAM-II, was brought to Vienna for IAEA consideration. This initial foray into the usage of nondestructive assay (NDA) as an independent assessment tool has materialized into one of the important tools for IAEA inspections. NDA instruments have several inherent advantages for inspectors; their measurements generate no radioactive waste, provide immediate answers, do not require specialized operators, and can be either taken to the items to be measured (portable instruments), or the items for measurement can be brought to the instruments, such as can be applied in on-site IAEA laboratories or off-site IAEA lab at Siebersdorf. The SAM-II was a small, lightweight, battery-powered, gamma-ray instrument used for uranium enrichment measurements. It was also found to be usehl for locating nuclear material, distinguishing between uranium and plutonium, and determining the active length of items like fuel pins. However it was not well suited for determining the amount of bulk material present, except for small containers of low-density materials. A 6-sided neutron coincidence counter, easily disassembled so it could be shipped and carried by airplane, was developed for bulk measurements of plutonium. The HLNCC (High Level Neutron Coincidence Counter) was immediately useful for quantitative measurements of pure plutonium oxide. However, the IAEA had to make a trade-off between the ease of use of NDA instruments on-site, and the problems of obtaining small samples for shipment to an independent lab for more accurate analysis. NDA does not create radioactive waste, so as waste handling has become more cautious and more regulated, NDA looks better and better. After acceptance of NDA by the IAEA for routine use, the follow-up question was naturally, 'How much better can this measurement be made?' The Program for Technical Assistance to IAEA Safeguards (POTAS) supported multiple and varied efforts in this direction, such as improving both the plutonium isotopic distribution measurement and the multiplicity counter, so that the assays can be performed on any plutonium samples instead of only pure oxides. Advances have also been made on uranium bulk measurements by the development of the active well coincidence counter. Meanwhile, several large bulk-handling facilities have been coming on line under IAEA safeguards. These facilities require full-time inspectors to be present whenever the plant is operating. The IAEA requested help so that measurements can be made even when inspectors are not present. The evolution and success of unattended NDA has been responsible for the capability of the IAEA to monitor large bulk-handling facilities without substantial increase in inspection effort. The integration of NDA with containment & surveillance measures and automation has been crucial to reducing inspection manpower. These systems have developed to the point where the IAEA can make credible conclusions on large high-throughput plants such as mixed-oxide (MOX) fuel fabrication or reprocessing plants.

  20. U.S. Energy Secretary Chu to Lead Delegation to IAEA 54th Annual...

    Office of Environmental Management (EM)

    Chu to Lead Delegation to IAEA 54th Annual General Conference U.S. Energy Secretary Chu to Lead Delegation to IAEA 54th Annual General Conference September 17, 2010 - 12:00am...

  1. IAEA-Botswana Cooperation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, search OpenEIHesperia, California:ProjectProgramsAlterationAl.,GRC Jay

  2. IAEA CRP on HTGR Uncertainty Analysis: Benchmark Definition and Test Cases

    SciTech Connect (OSTI)

    Gerhard Strydom; Frederik Reitsma; Hans Gougar; Bismark Tyobeka; Kostadin Ivanov

    2012-11-01T23:59:59.000Z

    Uncertainty and sensitivity studies are essential elements of the reactor simulation code verification and validation process. Although several international uncertainty quantification activities have been launched in recent years in the LWR, BWR and VVER domains (e.g. the OECD/NEA BEMUSE program [1], from which the current OECD/NEA LWR Uncertainty Analysis in Modelling (UAM) benchmark [2] effort was derived), the systematic propagation of uncertainties in cross-section, manufacturing and model parameters for High Temperature Reactor (HTGR) designs has not been attempted yet. This paper summarises the scope, objectives and exercise definitions of the IAEA Coordinated Research Project (CRP) on HTGR UAM [3]. Note that no results will be included here, as the HTGR UAM benchmark was only launched formally in April 2012, and the specification is currently still under development.

  3. Using Process Load Cell Information for IAEA Safeguards at Enrichment Plants

    SciTech Connect (OSTI)

    Laughter, Mark D [ORNL; Whitaker, J Michael [ORNL; Howell, John [University of Glasgow

    2010-01-01T23:59:59.000Z

    Uranium enrichment service providers are expanding existing enrichment plants and constructing new facilities to meet demands resulting from the shutdown of gaseous diffusion plants, the completion of the U.S.-Russia highly enriched uranium downblending program, and the projected global renaissance in nuclear power. The International Atomic Energy Agency (IAEA) conducts verification inspections at safeguarded facilities to provide assurance that signatory States comply with their treaty obligations to use nuclear materials only for peaceful purposes. Continuous, unattended monitoring of load cells in UF{sub 6} feed/withdrawal stations can provide safeguards-relevant process information to make existing safeguards approaches more efficient and effective and enable novel safeguards concepts such as information-driven inspections. The IAEA has indicated that process load cell monitoring will play a central role in future safeguards approaches for large-scale gas centrifuge enrichment plants. This presentation will discuss previous work and future plans related to continuous load cell monitoring, including: (1) algorithms for automated analysis of load cell data, including filtering methods to determine significant weights and eliminate irrelevant impulses; (2) development of metrics for declaration verification and off-normal operation detection ('cylinder counting,' near-real-time mass balancing, F/P/T ratios, etc.); (3) requirements to specify what potentially sensitive data is safeguards relevant, at what point the IAEA gains on-site custody of the data, and what portion of that data can be transmitted off-site; (4) authentication, secure on-site storage, and secure transmission of load cell data; (5) data processing and remote monitoring schemes to control access to sensitive and proprietary information; (6) integration of process load cell data in a layered safeguards approach with cross-check verification; (7) process mock-ups constructed to provide simulated load cell data; (8) hardware and software implementation for process load cell data collection; (9) costs associated with unattended monitoring of load cells (for both operator and inspector) weighed against the potential benefits of having access to such data; (10) results from field tests of load cell data collection systems in operating facilities; and (11) use of unattended load cell data to increase efficiency of on-site inspection schedules and activities.

  4. The IAEA Workshop on Requirements and Potential Technologies for Replacement of 3He Detectors in IAEA Safeguards Applications

    SciTech Connect (OSTI)

    Pickrell, Mark; Lavietes, Anthony; Gavron, Victor A.; Henzlova, D.; Joyce, Malcolm J.; Kouzes, Richard T.; Menlove, H. O.

    2013-01-01T23:59:59.000Z

    From 22 – 24 March, 2011, the International Atomic Energy Agency (IAEA) held an international workshop to address the question of a possible replacement for helium-3 based neutron detectors. Within this wider scope, the workshop was focused on those applications used in IAEA verification activities. There were two principle objectives of the workshop: 1) to determine the specific requirements that a potential replacement technology would have to satisfy, and 2) to identify alternative detector technologies that appear promising for meeting those requirements. The workshop was successful in achieving both objectives. A set of detailed and quantitative specifications was developed and achieved a general consensus among the conference participants. These included operational considerations such as temperature stability, safety, weight, and cost in addition to a number of performance requirements. The performance requirements were derived from an analysis of the spectrum of IAEA applications that use neutron detectors. After analyzing these applications, it was determined that the most common application for 3He detectors was for neutron coincidence counting, comprising over 95% of 3He use. The details and rationale for this assessment will be provided. The performance requirements for neutron coincidence counting can be directly calculated from the standard variance expressions. From these, a basic figure of merit (FOM) was developed that can be used to rank various different options. For neutron coincidence counting, the figure of merit is: , where ? is the detection efficiency and is the detector die away time. Both the FOM and the calculations will be presented. The full list of requirements is included in this paper. The second purpose of the workshop was to identify promising replacement technologies. There were multiple presentations of candidate detection technologies over the course of the workshop, covering a wide spectrum of approaches and detection physics. These technologies were judged relative to the performance of a 3He-based system, as well as its ability to meet the replacement technology requirements as developed in this workshop. The paper will present a summary of this assessment.

  5. Role of IAEA (International Atomic Energy Agency) safeguards in confidence building

    SciTech Connect (OSTI)

    Augustson, R.H.

    1989-01-01T23:59:59.000Z

    In this paper, I will examine some attributes of confidence building and connect them with how the International Atomic Energy Agency (IAEA) interacts with its member states in carrying out its safeguards function. These interactions and the structure set up to define them help maintain and strengthen confidence between the IAEA and the member states and among these states. 3 refs.

  6. End user needs for enhanced IAEA Safeguards Information Management Capabilities

    SciTech Connect (OSTI)

    Badalamente, R. [Pacific Northwest Lab., Richland, WA (United States); Anzelon, G. [Lawrence Livermore National Lab., CA (United States); Deland, S. [Sandia National Labs., Albuquerque, NM (United States); Whiteson, R. [Los Alamos National Lab., NM (United States)

    1994-07-01T23:59:59.000Z

    The International Atomic Energy Agency is undertaking a program for strengthening its safeguards on the recognition that safeguards must give assurance not only of the non-diversion of declared material or that declared facilities are not being misused, but also of the absence of any undeclared nuclear activities in States which have signed comprehensive safeguards agreements with the Agency. The IAEA has determined that the detection of undeclared nuclear activities and the creation of confidence in the continuing peaceful use of declared material and facilities is largely dependent on more information being made available to the Agency and on the capability of the Agency to make more effective use of this additional information, as well as existing information.

  7. Los Alamos National Laboratory support to IAEA environmental safeguards

    SciTech Connect (OSTI)

    Steiner, Robert E [Los Alamos National Laboratory; Dry, Don E [Los Alamos National Laboratory; Roensch, Fred R [Los Alamos National Laboratory; Kinman, Will S [Los Alamos National Laboratory; Roach, Jeff L [Los Alamos National Laboratory; La Mont, Stephen P [Los Alamos National Laboratory

    2010-12-01T23:59:59.000Z

    The nuclear and radiochemistry group provides sample preparation and analysis support to the International Atomic Energy Agency (IAEA) Network of Analytical Laboratories (NWAL). These analyses include both non-destructive (alpha and gamma-ray spectrometry) and destructive (thermal ionization mass spectrometry and inductively coupled plasma mass spectrometry) methods. On a bi-annual basis the NWAL laboratories are invited to meet to discuss program evolution and issues. During this meeting each participating laboratory summarizes their efforts over the previous two years. This presentation will present Los Alamos National Laboratories efforts in support of this program. Data showing results from sample and blank analysis will be presented along with capability enhancement and issues that arose over the previous two years.

  8. The future of IAEA safeguards: challenges and responses

    SciTech Connect (OSTI)

    Pilat, Joseph F [Los Alamos National Laboratory; Budlong - Sylvester, Kory W [Los Alamos National Laboratory

    2011-01-01T23:59:59.000Z

    For nearly two decades, the International Atomic Energy Agency (lAEA) has been transforming its safeguards system to address the challenges posed by undeclared nuclear programs, the associated revelation of an extensive non-State nuclear procurement network and other issues, including past limits to its verification mandate and the burden of noncompliance issues. Implementing the new measures, including those in the Additional Protocol, and integrating new and old safeguards measures, remains a work in progress. Implementation is complicated by factors including the limited teclmological tools that are available to address such issues as safeguarding bulk handling facilities, detection of undeclared facilities/activities, especially related to enrichment, etc. As this process continues, new challenges are arising, including the demands of expanding nuclear power production worldwide, so-called safeguards by design for a new generation of facilities, the possible IAEA role in a fissile material cutoff treaty and other elements of the arms control and disarmament agenda, the possible role in 'rollback' cases, etc. There is no doubt safeguards will need to evolve in the future, as they have over the last decades. In order for the evolutionary path to proceed, there will inter alia be a need to identify technological gaps, especially with respect to undeclared facilities, and ensure they are filled by adapting old safeguards technologies, by developing and introducing new and novel safeguards teclmologies and/or by developing new procedures and protocols. Safeguards will also need to respond to anticipated emerging threats and to future, unanticipated threats. This will require strategic planning and cooperation among Member States and with the Agency. This paper will address challenges to IAEA safeguards and the technological possibilities and R&D strategies needed to meet those challenges in the context of the forty-year evolution of safeguards, including the ongoing transformation of safeguards by the Agency.

  9. Microsoft PowerPoint - Reporting data to the IAEA by a newly...

    National Nuclear Security Administration (NNSA)

    by a newly selected facility Gary Hirsch, NMMSS Brian Horn, NRC Carol Wormington, URENCO USA Friday June, 28, 2013 IAEA letter to the U.S. Government informing us that,...

  10. Development of an IAEA Training Course for Future U.S. Inspectors

    SciTech Connect (OSTI)

    Savannah Avgerinos Fitzwater; Amanda R. Rynes; David S. Bracken; Richard R. M. Metcalf; James D. West

    2011-07-01T23:59:59.000Z

    U.S. citizens currently make up only 12% of the positions held in the IAEA’s Department of Safeguards. While the United States has maintained a high level of support for the Agency over the duration of its history, the number of American inspectors currently in the field does not reflect this level of involvement. As a result, the National Nuclear Security Administration’s Office of International Relations, as part of the Next Generation Safeguards Initiative (NGSI) mission, has tasked Idaho National Laboratory (INL) to develop a rigorous two week hands-on training program to encourage and operationally acclimatize U.S. Citizens who are interested in applying for IAEA inspector positions using IAEA authorized equipment at INL. Idaho National Laboratory is one-of-a-kind in its ability to train IAEA inspectors by including training at nuclear facilities on site and includes, for example, direct measurement of an active spent fuel storage cooling pond. This accredited course will introduce and train attendees on the major IAEA systems used in collecting nuclear safeguards data and performing safeguards inspections. Unique in the United States, these classes will give attendees direct hands-on training and will address equipment purpose, function, operating principles, application, and troubleshooting, based upon what would be expected of an IAEA Safeguards Inspector in the field and in the office. Upon completion, U.S. applicants will be better qualified to pursue a position in the IAEA Department of Safeguards Operational Divisions. In support, INL has recently established a new laboratory space to house state of the art nuclear safeguards instrumentation. Currently, equipment installed in the laboratory space includes attended systems: 3DLR (3-D Imaging Laser) for design information verification, a Digital Cerenkov Viewing Device for measurement of spent fuel, HM-5 handheld radiation detectors, quantitative neutron and gamma systems; unattended monitoring systems including: NGAM and MiniGRAND radiation systems and a DMOS camera system, and VACOSS/EOSS Optical Sealing Systems..

  11. The US Support Program to IAEA Safeguards Priority of Containment and Surveillance

    SciTech Connect (OSTI)

    Diaz,R.A.

    2008-06-13T23:59:59.000Z

    The United States Support Program (USSP) priority for containment and surveillance (US) focuses on maintaining or improving the reliability and cost-effectiveness of C/S systems for IAEA safeguards, expanding the number of systems that are unattended and remotely monitored, and developing verification methods that help streamline the on-site inspection process. Existing IAEA C/S systems have evolved to become complex, integrated systems, which may include active seals, nondestructive assay (NDA) instruments, video cameras, and other sensors. These systems operate autonomously. They send analytical data to IAEA headquarters where it can be reviewed. These systems present challenges to the goals of improved system performance, standardization, reliability, maintainability, documentation, and cost effectiveness. One critical lesson from past experiences is the need for cooperation and common objectives among the IAEA, the developer, and the facility operator, to create a successful, cost effective system. Recent USSP C/S activities include Rokkasho Reprocessing Plant safeguard systems, production of a new shift register, numerous vulnerability assessments of C/S systems, a conduit monitoring system which identifies tampering of IAEA conduit deployed in the field, fiber optic seal upgrades, unattended monitoring system software upgrades, next generation surveillance system which will upgrade existing camera systems, and support of the IAEA's development of the universal nondestructive assay data acquisition platform.

  12. Service Description Unit Rate in $ Invoice Description Database Administration (1 to 600 MB) MB/Month 0.550 DATABASE 1-600 MB/MO

    E-Print Network [OSTI]

    Service Description Unit Rate in $ Invoice Description Database Administration (1 to 600 MB) MB/Month 0.550 DATABASE 1-600 MB/MO Database Administration (601 to 950 MB) MB/Month 0.290 DATABASE 601-950 MB/MO Database Administration (951 to 3,000 MB) MB/Month 0.200 DATABASE 951-3,000 MB/MO Database

  13. Service Description Unit Rate in $ Invoice Description Database Administration (1 to 600 MB) MB/Month 0.500 DATABASE 1-600 MB/MO

    E-Print Network [OSTI]

    Service Description Unit Rate in $ Invoice Description Database Administration (1 to 600 MB) MB/Month 0.500 DATABASE 1-600 MB/MO Database Administration (601 to 950 MB) MB/Month 0.265 DATABASE 601-950 MB/MO Database Administration (951 to 3,000 MB) MB/Month 0.175 DATABASE 951-3,000 MB/MO Database

  14. 21.st IAEA FEC TH/3-2 Electron fishbones: theory and experimental evidence 1 IAEA FEC 2006 F. Zonca et al.

    E-Print Network [OSTI]

    Zonca, Fulvio

    . (Wong et al, PRL 85, 996, 2000). Excitation by barely trapped suprathermal electrons, characterized. Chen, et al., PRL 52, 1122, 1984) Fast electron kinetic response (L. Chen, et al., PRL 52, 1122, 1984) Ideal MHD response (M.N. Bussac, et al., PRL 35, 1638, 1975) #12;21.st IAEA FEC TH/3-2 Electron

  15. IAEA SAFEGUARDS DURING PLUTONIUM STABILIZATION AT HANFORDS PLUTONIUM FINISHING PLANT (PFP)

    SciTech Connect (OSTI)

    MCRAE, L.P.

    2004-02-20T23:59:59.000Z

    The Vault at the Plutonium Finishing Plan (PFP) became subject to the International Atomic Energy Agency (IAEA) safeguards beginning in 1994 as part of the US excess fissile material program. The inventory needed to be stabilized and repackaged for long-term storage to comply with Defense Nuclear Facilities Safety Board Recommendation 94-1. In 1998, the United States began negotiations with IAEA to develop methods to maintain safeguards as this material was stabilized and repackaged. The Design Information Questionnaire was revised and submitted to the IAEA in 2002 describing how PFP would be modified to accommodate the stabilization process line. The operation plan for 2003 was submitted describing the proposed schedules for removing materials for stabilization. Stabilization and repackaging activities for the safeguarded plutonium began in January 2003 and were completed in December 2003. The safeguards approach implemented at the Hanford Site was a combination of the original baseline approach augmented by a series of five vault additions of stabilized materials followed by five removals of unstabilized materials. IAEA containment and surveillance measures were maintained until the unstabilized material was removed. Following placement of repackaged material (most from the original safeguarded stock) into the storage vault, the IAEA conducted inventory change verification measurements and then established containment and surveillance. As part of the stabilization campaign, the IAEA developed new measurement methods and calibration standards representative of the materials and packaging. The annual physical inventory verification was conducted on the normal IAEA schedule following the fourth additional/removal phase. Plant activities and the impacts on operations are described.

  16. Working for the IAEA A Guide for US Citizens

    E-Print Network [OSTI]

    Religious Services, 50 Safety & Security, 50 Schools & Education Facilities, 52 Shopping, 54 Sports in a series of guides produced by the International Safeguards Project Office (ISPO) to help US citizens who

  17. INTERNATIONAL ATOMIC ENERGY AGENCY (IAEA) SAFEGUARDS DURING STABILIZATION AT HANFORD PLUTONIUM FINISHING PLANT (PFP)

    SciTech Connect (OSTI)

    MCRAE, L.P.

    2004-06-30T23:59:59.000Z

    The Vault at the Plutonium Finishing Plan (PFP) became subject to the International Atomic Energy Agency (IAEA) safeguards beginning in 1994 as part of the US excess fissile material program. The inventory needed to be stabilized and repackaged for long-term storage to comply with Defense Nuclear Facility Safety Board Recommendation 94-1. In 1998, the United States began negotiations with IAEA to develop methods to maintain safeguards during stabilization and repackaging of this material. The Design Information Questionnaire was revised and submitted to the IAEA in 2002 describing modification to the facility to accommodate the stabilization process line. The operation plan for 2003 was submitted describing the proposed schedules for removing materials for stabilization. Stabilization and repackaging activities for the safeguarded plutonium began in January 2003 and were completed in December 2003. The stabilization was completed in five phases. IAEA containment and surveillance measures were maintained until the material was removed by phase for stabilization and repackaging. Following placement of the repackaged material into the storage vault, the IAEA conducted inventory change verification measurements, and re-established containment and surveillance. Plant activities and the impacts on operations are described.

  18. The U.S./IAEA Workshop on Software Sustainability for Safeguards Instrumentation

    SciTech Connect (OSTI)

    Pepper S. E.; .; Worrall, L.; Pickett, C.; Bachner, K.; Queirolo, A.

    2014-08-08T23:59:59.000Z

    The U.S. National Nuclear Security Administration’s Next Generation Safeguards Initiative, the U.S. Department of State, and the International Atomic Energy Agency (IAEA) organized a a workshop on the subject of ”Software Sustainability for Safeguards Instrumentation.” The workshop was held at the Vienna International Centre in Vienna, Austria, May 6-8, 2014. The workshop participants included software and hardware experts from national laboratories, industry, government, and IAEA member states who were specially selected by the workshop organizers based on their experience with software that is developed for the control and operation of safeguards instrumentation. The workshop included presentations, to orient the participants to the IAEA Department of Safeguards software activities related to instrumentation data collection and processing, and case studies that were designed to inspire discussion of software development, use, maintenance, and upgrades in breakout sessions and to result in recommendations for effective software practices and management. This report summarizes the results of the workshop.

  19. JOINT UNITED STATES/IAEA PROPOSED APPROACH FOR SAFEGUARDS DURING PLUTONIUM STABILIZATION, PACKAGING, AND SHIPMENT

    SciTech Connect (OSTI)

    L. KWEI; B. SMITH; ET AL

    2001-02-01T23:59:59.000Z

    For safety reasons, the U.S. Department of Energy (DOE) is preparing to stabilize and package plutonium oxide currently subject to International Atomic Energy Agency safeguards at the Rocky Flats Environmental Technology Site (RFETS) beginning in the year 2001. The Hanford Site will also stabilize and package plutonium materials under IAEA safeguards. The U.S. and the IAEA began consultations in late 1996 to develop an approach to the application of safeguards during stabilization and packaging. With the plans to ship RFETS plutonium to Savannah River for interim storage prior to final disposition, this work has been extended to include safeguards during shipment. This paper will discuss the elements of a joint U.S./IAEA proposal for this task.

  20. Comparison of the NRC and the IAEA regulatory documents in the area of nuclear fuel systems

    SciTech Connect (OSTI)

    El-Adham, K.; Shinaishin, M.A.

    1991-04-01T23:59:59.000Z

    A main objective of this work was to identify the safety requirements in the area of fuel system design and performance from both the International Atomic Energy Agency (IAEA) and U.S. Nuclear Regulatory Commission (NRC) points of view. The study covered requirements during normal plant operation as well as during accident conditions. This study revealed that, although none of the factors to be considered for fuel safety were neglected in the IAEA regulatory documents, these documents are not complete in themselves, particularly because they lack quantitative guidelines and specific industrial standards. Although generality makes the IAEA requirements adaptable to many countries, on the other hand, it makes their applicability constrained by the availability of highly qualified and experienced personnel who can translate the qualitative requirements given in these documents into actual engineering solutions. 20 refs.

  1. 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems

    SciTech Connect (OSTI)

    Berk, Herbert L.; Breizman, Boris N.

    2014-02-21T23:59:59.000Z

    The 12th IAEA Technical Meeting on Energetic Particles in Magnetic Confinement Systems took place in Austin, Texas (7–11 September 2011). This meeting was organized jointly with the 5th IAEA Technical Meeting on Theory of Plasma Instabilities (5–7 September 2011). The two meetings shared one day (7 September 2011) with presentations relevant to both groups. Some of the work reported at these meetings was then published in a special issue of Nuclear Fusion [Nucl. Fusion 52 (2012)]. Summaries of the Energetic Particle Conference presentations were given by Kazuo Toi and Boris Breizman. They respectively discussed the experimental and theoretical progress presented at the meeting. Highlights of this meeting include the tremendous progress that has been achieved in the development of diagnostics that enables the ‘viewing’ of internal fluctuations and allows comparison with theoretical predictions, as demonstrated, for example, in the talks of P. Lauber and M. Osakabe. The need and development of hardened diagnostics in the severe radiation environment, such as those that will exist in ITER, was discussed in the talks of V. Kiptily and V.A. Kazakhov. In theoretical studies, much of the effort is focused on nonlinear phenomena. For example, detailed comparison of theory and experiment on D-III-D on the n = 0 geodesic mode was reported in separate papers by R. Nazikian and G. Fu. A large number of theoretical papers were presented on wave chirping including a paper by B.N. Breizman, which notes that wave chirping from a single frequency may emanate continuously once marginal stability conditions have been established. Another area of wide interest was the detailed study of alpha orbits in a burning plasma, where losses can come from symmetry breaking due to finite coil number or magnetic field imperfections introduced by diagnostic or test modules. An important area of development, covered by M.A. Hole and D.A. Spong, is concerned with the self-consistent treatment of the induced fields that accounts for toroidally asymmetric MHD response. In addition, a significant number of studies focused on understanding nonlinear behavior by means of computer simulation of energetic particle driven instability. An under-represented area of investigation was the study of electron runaway formation during major tokamak disruptions. It was noted in an overview by S. Putvinski that electron energies in the 10–20 MeV range is to be expected during projected major disruptions in ITER and that reliable methods for mitigation of the runaway process needs to be developed. Significant recent work in the field of the disruption induced electron runaway, which was reported by J. Riemann, had been submitted to Physics of Plasmas [3]. Overall it is clear that reliable mitigation of electron runaway is an extremely important topic that is in need of better understanding and solutions.

  2. IAEA Inspections for Undeclared and Declared Activities: Is a More Robust Approach Needed?

    SciTech Connect (OSTI)

    Mark Schanfein

    2009-07-01T23:59:59.000Z

    The United States has long supported a strong international safeguards system and for many years has served as the foremost supplier of technology, equipment, and training to the International Atomic Energy Agency (IAEA). In doing so, it drew in many instances on DOE sponsored R&D and training that was directed towards domestic safeguards and then adapted for IAEA purposes. This was relatively straightforward because of the strong overlap between the development of nuclear material accountancy measures needed for both domestic and international purposes. Two factors have emerged that have made this strong reliance on domestic measures less and less able to be a source of support for the IAEA. One is the shift by the IAEA safeguards system towards detecting undeclared activities. The second is the shift of domestic attention away from nuclear material accountancy and towards physical protection. As a result, a gap in US sponsored R&D and training relevant to international safeguards has developed. The NNSA Next Generation Safeguards Initiative and the DOE NA-22 Safeguards R&D program are intended to help fill this gap and, thereby, permit the U.S. to remain as the pre-eminent supplier of technology for international safeguards purposes. In this context, IAEA challenges have been examined from the perspective of detecting the diversion of nuclear material from declared stocks; detecting undeclared production of nuclear material and activities at locations declared under INFCIRC/153; and detecting undeclared nuclear material and activities elsewhere in a state. Of these, the detection of undeclared nuclear material and activities is, perhaps, the IAEA’s most significant challenge. It is a challenge that even the international community finds difficult to meet because of the scope and the geographic scale of the problem, the technical constraints, the knowledge required, and the significant resources needed to deploy effective systems world-wide (e.g., satellite surveillance systems). The IAEA’s success in carrying out this mission hinges on its capability to evaluate the declarations made by the state for completeness, correctness, and consistency in order to detect possible indications of undeclared nuclear material and activities. Three elements go into this evaluation: (1) evaluating the internal consistency of a State’s declaration and comparing it to information gathered by IAEA inspectors on the basis of their access to the locations, facilities, sites, personnel, and documents disclosed in the state’s declarations; (2) comparison of States’ declarations with other information available to the IAEA, including the information it gathers from its review of open sources, including scientific and technical literature and data bases, trade journals, and media reports; and (3) its ability to archive, retrieve, organize, and analyze all available information for indications of potential undeclared nuclear material and activities, and, when warranted, to request states to provide further information and access in order to investigate and clarify any questions or inconsistencies.

  3. 23rd IAEA Fusion Energy Conference: Summary Of Sessions EX/C and ICC

    SciTech Connect (OSTI)

    Hawryluk, R J [PPPL

    2011-01-05T23:59:59.000Z

    An overview is given of recent experimental results in the areas of innovative confinement concepts, operational scenarios and confinement experiments as presented at the 2010 IAEA Fusion Energy Conference. Important new findings are presented from fusion devices worldwide, with a strong focus towards the scientific and technical issues associated with ITER and W7-X devices, presently under construction.

  4. The US Support Program to IAEA Safeguards Priority of Training and Human Resources

    SciTech Connect (OSTI)

    Queirolo,A.

    2008-06-13T23:59:59.000Z

    The U.S. Support Program to IAEA Safeguards (USSP) priority of training and human resources is aimed at providing the Department of Safeguards with an appropriate mixture of regular staff and extrabudgetary experts who are qualified to meet the IAEA's technical needs and to provide personnel with appropriate instruction to improve the technical basis and specific skills needed to perform their job functions. The equipment and methods used in inspection activities are unique, complex, and evolving. New and experienced safeguards inspectors need timely and effective training to perform required tasks and to learn new skills prescribed by new safeguards policies or agreements. The role of the inspector has changed from that of strictly an accountant to include that of a detective. New safeguards procedures are being instituted, and therefore, experienced inspectors must be educated on these new procedures. The USSP also recognizes the need for training safeguards support staff, particularly those who maintain and service safeguards equipment (SGTS), and those who perform information collection and analysis (SGIM). The USSP is committed to supporting the IAEA with training to ensure the effectiveness of all staff members and will continue to offer its assistance in the development and delivery of basic, refresher, and advanced training courses. This paper will discuss the USSP ongoing support in the area of training and IAEA staffing.

  5. 21st IAEA Fusion Energy Conference, Chengdu, 16 21 October 2006 1 Max-Planck-Institut

    E-Print Network [OSTI]

    7 Thermal Insulation of the Plasma Vessel Al-coated glass fibre panel with MLI Cu-braids for connection to He-cooling pipe MLI: 20 layers of crinkled, Al-coated Kapton foil Thermal insulation on a vacuum vessel sector 21st IAEA Fusion Energy Conference, Chengdu, 16 ­ 21 October 2006 8 Fabrication

  6. Secretary of Energy Steven Chu speaks to the 2009 IAEA General Conference delegation

    ScienceCinema (OSTI)

    Secretary Chu

    2010-09-01T23:59:59.000Z

    On Sept. 14, 2009, U.S. Secretary of Energy Steven Chu addressed the 2009 IAEA General Conference delegation. Chu is the first Cabinet official to discuss President Obama's nuclear security and nonproliferation agenda outside the United States since the President delivered his landmark speech in Prague in April 2009.

  7. A E Costley ITER Diagnostics, 21st IAEA of 5 slides

    E-Print Network [OSTI]

    shielding, Tritium containment, vacuum integrity, RH compatibility. #12;A E Costley ITER Diagnostics, 21st distinct measurement systems in total. #12;A E Costley ITER Diagnostics, 21st IAEA 9 of 5 slides HANDLING, Germany THE DESIGN AND IMPLEMENTATIONTHE DESIGN AND IMPLEMENTATION OF DIAGNOSTIC SYSTEMS ON ITEROF

  8. Results for Phase I of the IAEA Coordinated Research Program on HTGR Uncertainties

    SciTech Connect (OSTI)

    Gerhard Strydom; Friederike Bostelmann

    2015-01-01T23:59:59.000Z

    The quantification of uncertainties in design and safety analysis of reactors is today not only broadly accepted, but in many cases became the preferred way to replace traditional conservative analysis for safety and licensing analysis. The use of a more fundamental methodology is also consistent with the reliable high fidelity physics models and robust, efficient, and accurate codes available today. To facilitate uncertainty analysis applications a comprehensive approach and methodology must be developed and applied. High Temperature Gas-cooled Reactors (HTGR) has its own peculiarities, coated particle design, large graphite quantities, different materials and high temperatures that also require other simulation requirements. The IAEA has therefore launched a Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modeling (UAM) in 2013 to study uncertainty propagation specifically in the HTGR analysis chain. Two benchmark problems are defined, with the prismatic design represented by the General Atomics (GA) MHTGR-350 and a 250 MW modular pebble bed design similar to the HTR-PM (INET, China). This report summarizes the contributions of the HTGR Methods Simulation group at Idaho National Laboratory (INL) up to this point of the CRP. The activities at INL have been focused so far on creating the problem specifications for the prismatic design, as well as providing reference solutions for the exercises defined for Phase I. An overview is provided of the HTGR UAM objectives and scope, and the detailed specifications for Exercises I-1, I-2, I-3 and I-4 are also included here for completeness. The main focus of the report is the compilation and discussion of reference results for Phase I (i.e. for input parameters at their nominal or best-estimate values), which is defined as the first step of the uncertainty quantification process. These reference results can be used by other CRP participants for comparison with other codes or their own reference results. The status on the Monte Carlo modeling of the experimental VHTRC facility is also discussed. Reference results were obtained for the neutronics stand-alone cases (Ex. I-1 and Ex. I-2) using the (relatively new) Monte Carlo code Serpent, and comparisons were performed with the more established Monte Carlo codes MCNP and KENO-VI. For the thermal-fluids stand-alone cases (Ex. I-3 and I-4) the commercial CFD code CFX was utilized to obtain reference results that can be compared with lower fidelity tools.

  9. Trip report on IAEA Training Workshop on Implementation of Integrated Management Systems for Research Reactors (T3-TR-45496).

    SciTech Connect (OSTI)

    Pratt, Richard J.

    2013-11-01T23:59:59.000Z

    From 17-21 June 2013, Sandia National Laboratories, Technical Area-V (SNL TA-V) represented the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) at the International Atomic Energy Agency (IAEA) Training Workshop (T3-TR-45486). This report gives a breakdown of the IAEA regulatory structure for those unfamiliar, and the lessons learned and observations that apply to SNL TA-V that were obtained from the workshop. The Safety Report Series, IAEA workshop final report, and SNL TA-V presentation are included as attachments.

  10. A method for comparing impacts with real targets to impacts onto the IAEA unyielding target

    SciTech Connect (OSTI)

    Ammerman, D. J.

    1991-01-01T23:59:59.000Z

    The severity of the IAEA accident conditions test requirement (IAEA 1990) of an impact onto an essentially unyielding target from a drop height of 9 meters encompasses a large fraction of all real world impacts. This is true, in part, because of the unyielding nature of the impact target. Impacts onto the unyielding target have severities equivalent to higher velocity impacts onto real targets which are not unyielding. The severity of impacts with yielding targets is decreased by the amount of the impact energy absorbed in damaging the target. In demonstrating the severity of the regulatory impact event it is advantageous to be able to relate this impact onto an essentially unyielding target to impacts with yielding targets.

  11. Towards a tactical nuclear weapons treaty? Is There a Role of IAEA Tools of Safeguards?

    SciTech Connect (OSTI)

    Saunders, Emily C. [Los Alamos National Laboratory; Rowberry, Ariana N. [Los Alamos National Laboratory; Fearey, Bryan L. [Los Alamos National Laboratory

    2012-07-12T23:59:59.000Z

    In recent years, there is growing interest in formal negotiations on non-strategic or tactical nuclear weapons. With the negotiations of New START, there has been much speculation that a tactical nuclear weapons treaty should be included in the follow on to New START. This paper examines the current policy environment related to tactical weapons and some of the issues surrounding the definition of tactical nuclear weapons. We then map out the steps that would need to be taken in order to begin discussions on a tactical nuclear weapons treaty. These steps will review the potential role of the IAEA in verification of a tactical nuclear weapons treaty. Specifically, does IAEA involvement in various arms control treaties serve as a useful roadmap on how to overcome some of the issues pertaining to a tactical nuclear weapons treaty?

  12. Approach to IAEA verification of the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP)

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1982-01-01T23:59:59.000Z

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP), should that plant be placed under IAEA safeguards. The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistics for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of (a) attributes and variables sample sizes for the various strata, (b) standard deviations of the relevant test statistics, and (c) the sensitivity for detection of diversion which the IAEA might achieve by this verification strategy at GCEP.

  13. The Mailbox Computer System for the IAEA verification experiment on HEU downlending at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Aronson, A.L.; Gordon, D.M.

    2000-07-31T23:59:59.000Z

    IN APRIL 1996, THE UNITED STATES (US) ADDED THE PORTSMOUTH GASEOUS DIFFUSION PLANT TO THE LIST OF FACILITIES ELIGIBLE FOR THE APPLICATION OF INTERNATIONAL ATOMIC ENERGY AGENCY (IAEA) SAFEGUARDS. AT THAT TIME, THE US PROPOSED THAT THE IAEA CARRY OUT A ''VERIFICATION EXPERIMENT'' AT THE PLANT WITH RESPECT TO DOOWNBLENDING OF ABOUT 13 METRIC TONS OF HIGHLY ENRICHED URANIUM (HEU) IN THE FORM OF URANIUM HEXAFLUROIDE (UF6). DURING THE PERIOD DECEMBER 1997 THROUGH JULY 1998, THE IAEA CARRIED OUT THE REQUESTED VERIFICATION EXPERIMENT. THE VERIFICATION APPROACH USED FOR THIS EXPERIMENT INCLUDED, AMONG OTHER MEASURES, THE ENTRY OF PROCESS-OPERATIONAL DATA BY THE FACILITY OPERATOR ON A NEAR-REAL-TIME BASIS INTO A ''MAILBOX'' COMPUTER LOCATED WITHIN A TAMPER-INDICATING ENCLOSURE SEALED BY THE IAEA.

  14. A comparison of the PARET/ANL and RELAP5/MOD3 codes for the analysis of IAEA benchmark transients

    SciTech Connect (OSTI)

    Woodruff, W.L.; Hanan, N.A.; Smith, R.S.; Matos, J.E.

    1996-12-31T23:59:59.000Z

    The PARET/ANL and RELAP5/MOD3 codes are used to analyze the series of benchmark transients specified for the IAEA Research Reactor Core Conversion Guidebook (IAEA-TECDOC-643, Vol. 3). The computed results for these loss-of-flow and reactivity insertion transients with scram are in excellent agreement and agree well with the earlier results reported in the guidebook. Attempts to also compare RELAP5/MOD3 with the SPERT series of experiments are in progress.

  15. Implementation of the IAEA Additional Protocol in the Philippines: USDOE/PNRI Cooperation

    SciTech Connect (OSTI)

    Sequis, Julietta E.; Cain, Ronald A.; Burbank, Roberta L.; Hansen, Linda H.; VanSickle, Matthew; Killinger, Mark H.; Elkhamri, Oksana O.

    2011-07-19T23:59:59.000Z

    The Philippines entered into force the International Atomic Energy Agency (IAEA) Additional Protocol (AP) in February 2010. The Philippine Nuclear Research Institute (PNRI) is the government agency responsible for implementing the AP. In June 2010 the IAEA invited the U.S. Department of Energy (DOE) to help conduct a joint national training seminar on the AP. DOE presented to PNRI its AP international technical assistance program, administered by the International Nuclear Safeguards and Engagement Program (INSEP), which helps partner countries implement the AP. In coordination with the IAEA, DOE established this program in 2008 to complement IAEA AP seminars with long-term country-specific cooperation from the perspective of a Member State. The US version of the AP is the same version as that of non-nuclear weapon states except for the addition of a national security exclusion. Due to this, DOE cooperation with other countries enables the sharing of valuable lessons learned in implementing the AP. DOE/INSEP described to PNRI the various areas of cooperation it offers to interested countries, whether they are preparing for entry into force or already implementing the AP. Even countries that have entered the AP into force are sometimes not fully prepared to implement it well, and welcome cooperation to improve their implementation process. PNRI and DOE/INSEP subsequently agreed to cooperate in several areas to enhance the efficiency and effectiveness of the Philippines AP implementation. These areas include providing working-level training to PNRI staff and preparing an information document that details that training for future reference, assisting with the development of an outreach program and procedures for AP reporting and complementary access, and identifying Annex II equipment and non-nuclear materials whose export must be reported under the AP. DOE laboratory representatives, funded by INSEP, met again with PNRI in February 2011 to provide training for PNRI AP staff and investigate specific ways to improve implementation. Another meeting in July 2011 focused on preparations for outreach to industry and universities. In this paper PNRI describes current implementation of the AP in the Philippines, and both DOE/INSEP and PNRI provide their perspectives on their cooperation to enhance that implementation.

  16. Reference Material for Radionuclides in Sediment, IAEA-384 (Fangataufa Lagoon Sediment)

    SciTech Connect (OSTI)

    Povinec, P; Pham, M; Barci-Funel, G; Bojanawski, R; Boshkova, T; Burnett, W; Carvalho, F; Chapeyron, B; Cunha, I; Dahlgaard, H; Galabov, N; Gastaud, J; Geering, J; Gomez, I; Green, N; Hamilton, T; Ibanez, F; Majah, M I; John, M; Kanisch, G; Kenna, T; Kloster, M; Korun, M; Wee Kwong, L L; La Rosa, J; Lee, S; Levy-Palomo, I; Malatova, M; Maruo, Y; Mitchell, P; Murciano, I; Nelson, R; Oh, J; Oregioni, B; Petit, G L; Pettersson, H; Reineking, A; Smedley, P; Suckow, A; der Struijs, T v; Voors, P; Yoshimizu, K; Wyse, E

    2005-09-23T23:59:59.000Z

    The IAEA Marine Environment Laboratory (IAEA-MEL) in Monaco has conducted intercomparison exercises on radionuclides in marine samples for many years as part of its contribution to the IAEA's program of Analytical Quality Control Services (AQCS). An important part of the AQCS program has been a production of Reference Materials (RMs) and their provision to radioanalytical laboratories. The RMs have been developed for different marine matrices (sediment, water, biota), with accuracy and precision required for the present state of the art of radiometrics and mass spectrometry methods. The RMs have been produced as the final products of world-wide intercomparison exercises organized during last 30 years. A total of 44 intercomparison exercises were undertaken and 39 RMs were produced for radionuclides in the marine environment. All required matrices (seawater, biota, sediment) have been covered with radionuclide concentrations ranging from typical environmental levels to elevated levels affected by discharges from nuclear reprocessing plants. The long-term availability of RMs (over 10 years) requires the use of very specific techniques to collect and pretreat large quantities of material (e.g., in excess of 100 kg) in order to ensure sample stability and homogenization of any analytes of interest. The production of a RM is therefore a long process, covering the identification of needs, sample collection, pre-treatment, homogenization, bottling, distribution to laboratories, evaluation of data, preliminary reporting, additional analyses in expert laboratories, certification of the material, and finally issuing the RM. In this paper we describe a reference material IAEA-384, Fangataufa lagoon sediment, designed for determination of anthropogenic and natural radionuclides in the marine environment. This RM has been prepared with the aim of testing the performance of analytical laboratories to measure the activity of these radionuclides in a sediment sample contaminated by elevated levels of fallout from nuclear weapons tests. Participating laboratories were requested to determine as many radionuclides as possible by radiometric (alpha, beta and gamma-spectrometry) as well as by mass spectrometry methods (e.g., ICPMS - Inductively Coupled Plasma Mass Spectrometry, TIMS - Thermal Ionization Mass Spectrometry, AMS - Accelerator Mass Spectrometry).

  17. U.S. Co-Sponsored IAEA Workshop on GNEP Concludes | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergyTransportation WorkDecemberInjuryU.S. Co-Sponsored IAEA

  18. Microsoft PowerPoint - IAEA Safeguards Reporting Requirements for U.S. Facilities_Peter Habighorst

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysis and Feedback onWorkingIAEA Safeguards

  19. Microsoft PowerPoint - Implementation of IAEA safeguards_Peter Habighorst [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysis and Feedback onWorkingIAEA

  20. JET Posters Presented at the IAEA Technical Committee Meeting on H-mode Physics (Kloster Seon, Germany 22-24th September 1997)

    E-Print Network [OSTI]

    JET Posters Presented at the IAEA Technical Committee Meeting on H-mode Physics (Kloster Seon, Germany 22-24th September 1997)

  1. G. Vlad et al. 10th IAEA TM on Energetic Particles -Kloster Seeon, Germany, 8-10/10/2007 1 Particle Simulations of Alfvn Modes

    E-Print Network [OSTI]

    Vlad, Gregorio

    G. Vlad et al. 10th IAEA TM on Energetic Particles - Kloster Seeon, Germany, 8-10/10/2007 1 - Kloster Seeon, Germany, 8-10/10/2007 2 Outline · Introduction · Experimental observations · The HMGC code sensitivity) · Conclusions #12;G. Vlad et al. 10th IAEA TM on Energetic Particles - Kloster Seeon, Germany, 8

  2. G. Vlad et al. 21st IAEA Fusion Energy Conference, 16 -21 October 2006 -Chengdu, China -paper TH/P6-4 1 Particle Simulation Analysis of

    E-Print Network [OSTI]

    Vlad, Gregorio

    simulations performed by the Hybrid MHD-Gyrokinetic Code (HMGC). #12;G. Vlad et al. 21st IAEA Fusion EnergyG. Vlad et al. 21st IAEA Fusion Energy Conference, 16 - 21 October 2006 - Chengdu, China - paper TH/P6-4 1 Particle Simulation Analysis of Energetic-Particle and Alfvén-Mode Dynamics in JT-60U

  3. IAEA-CN-69/EXP2/12 Highly Radiative Plasmas for Local Transport Studies and Power and Particle

    E-Print Network [OSTI]

    energy production (7.6ĘMJ) in a TFTR pulse. Comparisons of the measured radiated power profiles the severe problem of concentrated power loading of the divertor.Ę[2] Experiments have shown that a large1 IAEA-CN-69/EXP2/12 Highly Radiative Plasmas for Local Transport Studies and Power and Particle

  4. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  5. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  6. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  7. International Research Reactor Decommissioning Project

    SciTech Connect (OSTI)

    Leopando, Leonardo [Philippine Nuclear Research Institute, Quezon City (Philippines); Warnecke, Ernst [International Atomic Energy Agency, Vienna (Austria)

    2008-01-15T23:59:59.000Z

    Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement to the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.

  8. Proceedings of the IAEA specialists` meeting on cracking in LWR RPV head penetrations

    SciTech Connect (OSTI)

    Pugh, C.E.; Raney, S.J. [comps.] [Oak Ridge National Lab., TN (United States)] [comps.; Oak Ridge National Lab., TN (United States)

    1996-07-01T23:59:59.000Z

    This report contains 17 papers that were presented in four sessions at the IAEA Specialists` meeting on Cracking in LWR RPV Head Penetrations held at ASTM Headquarters in Philadelphia on May 2-3, 1995. The papers are compiled here in the order that presentations were made in the sessions, and they relate to operational observations, inspection techniques, analytical modeling, and regulatory control. The goal of the meeting was to allow international experts to review experience in the field of ensuring adequate performance of reactor pressure vessel (RPV) heads and penetrations. The emphasis was to allow a better understanding of RPV material behavior, to provide guidance supporting reliability and adequate performance, and to assist in defining directions for further investigations. The international nature of the meeting is illustrated by the fact that papers were presented by researchers from 10 countries. There were technical experts present form other countries who participated in discussions of the results presented. This present document incorporates the final version of the papers as received from the authors. The final chapter includes conclusions and recommendations. Individual papers have been cataloged separately.

  9. Market Research Survey of Commercial Off-The-Shelf (COTS) Portable MS Systems for IAEA Safeguards Applications

    SciTech Connect (OSTI)

    Hart, Garret L.; Hager, George J.; Barinaga, Charles J.; Duckworth, Douglas C.

    2013-02-01T23:59:59.000Z

    This report summarizes the results for the market research survey of mass spectrometers that are deemed pertinent to International Atomic Energy Agency (IAEA) needs and strategic objectives. The focus of the report is on MS instruments that represent currently available (or soon to be) commercial off-the shelf (COTS) technology and weigh less than 400 pounds. A compilation of all available MS instruments (36 COTS and 2 R&D) is presented, along with pertinent information regarding each instrument.

  10. The IAEA Coordinated Research Program on HTGR Reactor Physics, Thermal-hydraulics and Depletion Uncertainty Analysis: Description of the Benchmark Test Cases and Phases

    SciTech Connect (OSTI)

    Frederik Reitsma; Gerhard Strydom; Bismark Tyobeka; Kostadin Ivanov

    2012-10-01T23:59:59.000Z

    The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The uncertainties in the HTR analysis tools are today typically assessed with sensitivity analysis and then a few important input uncertainties (typically based on a PIRT process) are varied in the analysis to find a spread in the parameter of importance. However, one wish to apply a more fundamental approach to determine the predictive capability and accuracies of coupled neutronics/thermal-hydraulics and depletion simulations used for reactor design and safety assessment. Today there is a broader acceptance of the use of uncertainty analysis even in safety studies and it has been accepted by regulators in some cases to replace the traditional conservative analysis. Finally, there is also a renewed focus in supplying reliable covariance data (nuclear data uncertainties) that can then be used in uncertainty methods. Uncertainty and sensitivity studies are therefore becoming an essential component of any significant effort in data and simulation improvement. In order to address uncertainty in analysis and methods in the HTGR community the IAEA launched a Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modelling early in 2012. The project is built on the experience of the OECD/NEA Light Water Reactor (LWR) Uncertainty Analysis in Best-Estimate Modelling (UAM) benchmark activity, but focuses specifically on the peculiarities of HTGR designs and its simulation requirements. Two benchmark problems were defined with the prismatic type design represented by the MHTGR-350 design from General Atomics (GA) while a 250 MW modular pebble bed design, similar to the INET (China) and indirect-cycle PBMR (South Africa) designs are also included. In the paper more detail on the benchmark cases, the different specific phases and tasks and the latest status and plans are presented.

  11. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  12. Progress of the EAST Project in China Y.X. Wan, P.D. Weng, J.G. Li, D.M. Gao, S.T. Wu

    E-Print Network [OSTI]

    puffing system · Diagnostic systems · Plasma control and data acquisition systems · Water cooling system system Cryostat vessel Support system The 20th IAEA FEC, Vilamoura, Portugal, 05-Nov-04 ProgressEAST ASIPP Progress of the EAST Project in China Y.X. Wan, P.D. Weng, J.G. Li, D.M. Gao, S.T. Wu

  13. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  14. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

  15. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: Ł1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  16. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: Ł3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  17. Summary for FT, IT and SE 20th IAEA Fusion Energy Conference

    E-Print Network [OSTI]

    and should be moved to the ultimat goal of utilizing fusion energy for human being in near future from existing experiments and these projections give confidence that ITER will meet it's goal of long

  18. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  19. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  20. Co-ordination of the International Network of Nuclear Structure and Decay Data Evaluators; Summary Report of an IAEA Technical Meeting

    SciTech Connect (OSTI)

    Abriola, D.; Tuli, J.

    2009-03-23T23:59:59.000Z

    The IAEA Nuclear Data Section convened the 18th meeting of the International Network of Nuclear Structure and Decay Data Evaluators at the IAEA Headquarters, Vienna, 23 to 27 March 2009. This meeting was attended by 22 scientists from 14 Member States, plus IAEA staff, concerned with the compilation, evaluation and dissemination of nuclear structure and decay data. A summary of the meeting, recommendations/conclusions, data centre reports, and various proposals considered, modified and agreed by the participants are contained within this document. The International Network of Nuclear Structure and Decay Data (NSDD) Evaluators holds biennial meetings under the auspices of the IAEA, and consists of evaluation groups and data service centres in several countries. This network has the objective of providing up-to-date nuclear structure and decay data for all known nuclides by evaluating all existing experimental data. Data resulting from this international evaluation collaboration is included in the Evaluated Nuclear Structure Data File (ENSDF) and published in the journals Nuclear Physics A and Nuclear Data Sheets (NDS).

  1. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  2. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  3. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  4. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  5. ERIS Project 

    E-Print Network [OSTI]

    Hunter, Philip

    repositories. If these (generally) smaller institutions wished to continue to have access to these hosted repository spaces after the end of the project, it was proposed that these repository-lite services would be administered by the SDLC (the Scottish Digital...

  6. Program of technical assistance to the Organization for the Prohibition of Chemical Weapons - lessons learned from the U.S. program of technical assistance to IAEA safeguards. Final report

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The Defense Nuclear Agency is sponsoring a technical study of the requirements of a vehicle to meet the OPCW`s future needs for enhanced chemical weapons verification capabilities. This report provides information about the proven mechanisms by which the U.S. provided both short- and long-term assistance to the IAEA to enhance its verification capabilities. Much of the technical assistance has generic application to international organizations verifying compliance with disarmament treaties or conventions. In addition, some of the equipment developed by the U.S. under the existing arrangements can be applied in the verification of other disarmament treaties or conventions. U.S. technical assistance to IAEA safeguards outside of the IAEA`s regular budget proved to be necessary. The U.S. technical assistance was successful in improving the effectiveness of IAEA safeguards for its most urgent responsibilities and in providing the technical elements for increased IAEA {open_quotes}readiness{close_quotes} for the postponed responsibilities deemed important for U.S. policy objectives. Much of the technical assistance was directed to generic subjects and helped to achieve a system of international verification. It is expected that the capabilities of the Organization for the Prohibition of Chemical Weapons (OPCW) to verify a state`s compliance with the {open_quotes}Chemical Weapons Convention{close_quotes} will require improvements. This report presents 18 important lessons learned from the experience of the IAEA and the U.S. Program of Technical Assistance to IAEA Safeguards (POTAS), organized into three tiers. Each lesson is presented in the report in the context of the difficulty, need and history in which the lesson was learned. Only the most important points are recapitulated in this executive summary.

  7. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  8. PROJECT SUMMARY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT SUMMARY 1

  9. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  10. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENA creates

  11. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagement

  12. Projects | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  13. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report: HPC-Colony IIProject Gnome

  14. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject FinalFluids |Storage Research and

  15. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description include anything that...

  16. Sandia National Laboratories: IAEA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the United States Conceptual Framework for Developing Resilience Metrics for the Electricity, Oil, and Gas Sectors in the United States Conceptual Framework for Developing...

  17. craig_IAEA.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4 Self-Scrubbing:,, , ., ..., ,+ .- web) Establish a formalGlobal

  18. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  19. Livingston Solar Canopy Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    ,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

  20. Information Visualization Graduate Project (Group Project)

    E-Print Network [OSTI]

    Rusu, Adrian

    Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

  1. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Hydroelectric Power Project impacts Improve natural salmonid habitat and production #12;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from livestockRest from livestock;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from

  2. Project Name Project Number Tagging Type

    E-Print Network [OSTI]

    Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

  3. Projects | Department of Energy

    Office of Environmental Management (EM)

    Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

  4. CRSP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expenses of the project each year, and receive all of the energy it produces. Salt Lake City AreaIntegrated Projects: Power from the Colorado River Storage Project plants was...

  5. Project Selection - Record Keeping

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

  6. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

  7. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    SciTech Connect (OSTI)

    Kollar, Lenka; Mathews, Caroline E.

    2009-07-01T23:59:59.000Z

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states’ (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In order to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.

  8. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  9. Project BETA Cover Page

    E-Print Network [OSTI]

    Cover Page, Project BETA

    2012-01-01T23:59:59.000Z

    and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

  10. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  11. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  12. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  13. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  14. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  15. Proceedings of the Joint IAEA/CSNI Specialists` Meeting on Fracture Mechanics Verification by Large-Scale Testing held at Pollard Auditorium, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Pugh, C.E.; Bass, B.R.; Keeney, J.A. [comps.] [Oak Ridge National Lab., TN (United States)

    1993-10-01T23:59:59.000Z

    This report contains 40 papers that were presented at the Joint IAEA/CSNI Specialists` Meeting Fracture Mechanics Verification by Large-Scale Testing held at the Pollard Auditorium, Oak Ridge, Tennessee, during the week of October 26--29, 1992. The papers are printed in the order of their presentation in each session and describe recent large-scale fracture (brittle and/or ductile) experiments, analyses of these experiments, and comparisons between predictions and experimental results. The goal of the meeting was to allow international experts to examine the fracture behavior of various materials and structures under conditions relevant to nuclear reactor components and operating environments. The emphasis was on the ability of various fracture models and analysis methods to predict the wide range of experimental data now available. The individual papers have been cataloged separately.

  16. Manhattan Project | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan Project Manhattan Project Manhattan Project New Manhattan Project Interactive Website The Department of Energy traces its origins to World War II and the Manhattan...

  17. MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives

    E-Print Network [OSTI]

    MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives vessel registries to conduct recreational catch and effort surveys. Develop a recreational fishing. Accuracy Funded 2012 Oregon Shore and EstuaryBoat Survey Design Review Develop a new or revised

  18. Senior projectS corporate Sponsored

    E-Print Network [OSTI]

    Stuart, Josh

    --Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

  19. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  20. Technology transfer significance of the International Safeguards Project Office

    SciTech Connect (OSTI)

    Marcuse, W.; Waligura, A.J.

    1988-06-01T23:59:59.000Z

    The safeguards implemented by the International Atomic Energy Agency (IAEA) are of major importance to the non-proliferation objectives of the United States of America and other nations of the world. Assurance of safeguards effectiveness is mandatory to continued peaceful use of nuclear power. To enhance the ability of the IAEA to apply safeguards effectively, and to ensure that the IAEA does not lack technical assistance in critical areas, the US Congress has made available a special authorization for a Program for Technical Assistance to IAEA Safeguards (POTAS). This substantial program of technology transfer was initiated in 1976. The United States Departments of State and Energy, the Arms control and Disarmament Agency and the Nuclear Regulatory Commission have each accepted responsibility for parts of the Program for Technical Assistance to IAEA Safeguards. Funding is provided by state through the Foreign Assistance Act. This report provides a discussion of this program.

  1. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

  2. The 4-H Project

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

  3. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  4. GHPsRUS Project

    SciTech Connect (OSTI)

    Battocletti, Liz

    2013-07-09T23:59:59.000Z

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  5. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  6. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  7. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  8. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21T23:59:59.000Z

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  9. Product Guide Project Standard and Project Professional

    E-Print Network [OSTI]

    Narasayya, Vivek

    ................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

  10. Leaching study of PNL 76-68 glass beads using the LLNL continuous-flow method and the PNL modified IAEA method. Final report

    SciTech Connect (OSTI)

    Coles, D.G.; Mensing, R.W.; Rego, J.; Weed, H.C.; Buddemeier, R.W.

    1982-10-04T23:59:59.000Z

    A long-term single-pass continuous-flow (SPCF) leaching test was conducted on the glass waste form PNL 76-68. Leaching rates of Np, Pu and various stable elements were measured at 25 and 75/sup 0/C with three different solutions and three different flow rates. The SPCF leaching results were compared with results of a modified IAEA leach test performed by Pacific Northwest Laboratories (PNL). Elemental leach rates and their variation with temperature, flow rate and solution composition were established. The LLNL and PNL leach test results appear to agree within experimental uncertainties. The magnitude of the leach rates determined for Np and the glass matrix elements is 10/sup -5/ grams of glass/cm/sup 2/ geometric solid surface area/day. The rates increase with temperature and with solution flow rate, and are similar in brine and distilled water but higher in a bicarbonate solution. Other cations exhibit somewhat different behavior, and Pu in particular yields a much lower apparent leach rate, probably because of sorption or precipitation effects after release from the glass matrix. After the initial few days, most elements are leached at a constant rate. Matrix dissolution appears to be the most probable rate controlling step for the leaching of most elements. 23 figures, 12 tables.

  11. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30T23:59:59.000Z

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  12. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  13. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31T23:59:59.000Z

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

  14. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  15. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  16. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

  17. Project: BELLA Bldg. #: 71

    E-Print Network [OSTI]

    TO CONSTRUCTION AS OF 10/4/2011 Current/Approved Projects Project: Solar Energy Research Center Bldg. #:TBD. #: TBD Affected Area: R1 Road & V Road (58) Dates: 8/2011 - 9/2013 6 Small Projects: A. B50 Electrical/1/2014 N3 (58) 42 11/1/2011 2/1/2014 M-1 (35) 12 10/1/2010 11/1/2011 B81 (21) 18 10/1/2010 11/1/2011 V Road

  18. 2015 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

  19. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  20. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  1. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  2. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  3. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  4. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  5. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  6. Project Finance Case Studies

    Broader source: Energy.gov [DOE]

    Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  8. TThe {\\sc Majorana} Project

    E-Print Network [OSTI]

    The MAJORANA collaboration

    2009-10-23T23:59:59.000Z

    The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  9. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  10. Energy Markets and Projections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Governors Association Governors' Advisors Energy Policy Institute July 24, 2014 | Washington, DC By Adam Sieminski, EIA Administrator Energy Markets and Projections NGA...

  11. Our Project Regional, community,

    E-Print Network [OSTI]

    Minnesota, University of

    City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

  12. Barstow Wind Turbine Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  13. Prison Solar Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  14. Nova Scotia Topographic Database 1:10000 Received: April 2009

    E-Print Network [OSTI]

    Brownstone, Rob

    Topographic Database Data Compilation Specifications Common Name Actual Name Description Building_Point BL_POINT Buildings too small to be represented as polygons. These include homes and small public buildings. There are codes to indicate usage Building_Poly BL_POLY Larger buildings. There are codes to indicate usage. Some

  15. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  16. A study of a zone approach to IAEA (International Atomic Energy Agency) safeguards: The low-enriched-uranium zone of a light-water-reactor fuel cycle

    SciTech Connect (OSTI)

    Fishbone, L.G.; Higinbotham, W.A.

    1986-06-01T23:59:59.000Z

    At present the IAEA designs its safeguards approach with regard to each type of nuclear facility so that the safeguards activities and effort are essentially the same for a given type and size of nuclear facility wherever it may be located. Conclusions regarding a state are derived by combining the conclusions regarding the effectiveness of safeguards for the individual facilities within a state. In this study it was convenient to define three zones in a state with a closed light-water-reactor nuclear fuel cycle. Each zone contains those facilities or parts thereof which use or process nuclear materials of the same safeguards significance: low-enriched uranium, radioactive spent fuel, or recovered plutonium. The possibility that each zone might be treated as an extended material balance area for safeguards purposes is under investigation. The approach includes defining the relevant features of the facilities in the three zones and listing the safeguards activities which are now practiced. This study has focussed on the fresh-fuel zone, the several facilities of which use or process low-enriched uranium. At one extreme, flows and inventories would be verified at each material balance area. At the other extreme, the flows into and out of the zone and the inventory of the whole zone would be verified. There are a number of possible safeguards approaches which fall between the two extremes. The intention is to develop a rational approach which will make it possible to compare the technical effectiveness and the inspection effort for the facility-oriented approach, for the approach involving the zone as a material balance area, and for some reasonable intermediate safeguards approaches.

  17. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15T23:59:59.000Z

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  18. Bacteria TMDL Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of TMDL projects for water bodies where swimming or wading may be unsafe or harvesting of oysters is limited or prohibited due to high concentrations of bacteria. ? Atascosa River: A TMDL Project for Bacteria ? Buffalo andWhite Oak Bayous: A TMDL...

  19. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    NONE

    2007-06-15T23:59:59.000Z

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  20. IAEA THEORY SUMMARY 1998 IAEA Meeting, Yokohama, Japan

    E-Print Network [OSTI]

    , Plasma Physics Laboratory Princeton, New Jersey, USA 1 Introduction is summary advances magnetic fusion energy theory research presented at 17th International Atomic Energy Agency Fusion Energy Conference from significant progress understanding physics of thermonuclear plasmas. Indeed, grand challenge field

  1. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  2. LIMB demonstration project extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21T23:59:59.000Z

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  3. NEPA COMPLIANCE SURVEY Project Information Project Title: Casing...

    Broader source: Energy.gov (indexed) [DOE]

    Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description nclude The...

  4. Kellogg and Russ Forest projects. 2002 Project sand highlights

    E-Print Network [OSTI]

    Kellogg and Russ Forest projects. 2002 Project sand highlights MacCready Reserve a new property of insects Galeerucella calmariensis,and G.pusilla to control purple loosestrife on May 13. #12;New Project

  5. NEPA COMPLIANCE SURVEY Project Information Project Title: South...

    Broader source: Energy.gov (indexed) [DOE]

    Facility 2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional...

  6. iaea | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. HirschOccurrencei-rapter | National Nucleariaea |

  7. Flash Steam Recovery Project 

    E-Print Network [OSTI]

    Bronhold, C. J.

    2000-01-01T23:59:59.000Z

    /condensate recovery system, resulting in condensate flash steam losses to the atmosphere. Using computer simulation models and pinch analysis techniques, the Operational Excellence Group (Six Sigma) was able to identify a project to recover the flash steam losses as a...

  8. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  9. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  10. Financing energy efficiency projects

    SciTech Connect (OSTI)

    Hansen, S.J.; Weisman, J.C. [Hansen Associates (United States)

    1999-07-01T23:59:59.000Z

    Getting an energy project financed should be a shared effort between the ESCO and the customer, but the perspectives are different. It is the ESCO`s responsibility to put together a bankable project. The ESCO typically arranges the financing. Its reputation and history often add surety, which offers financiers added confidence. The customer usually incurs the debt and needs to know the financing options available. This article first addresses what constitutes a bankable project from the ESCO perspective. Then, the types of financing available to owners are explored. ESCOs, who have been in this business for a few years, remember knocking on the financial doors until their knuckles were bloody. Today, the financiers knock on the ESCO doors...if, and it`s a big IF, ESCOs can put together bankable projects.

  11. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  12. Contract/Project Management

    Energy Savers [EERE]

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  13. Contract/Project Management

    Office of Environmental Management (EM)

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  14. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  15. IT Project Manager

    Broader source: Energy.gov [DOE]

    This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

  16. Healthcare Project Performance Benchmarks

    Broader source: Energy.gov [DOE]

    Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the healthcare industry, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

  17. Simulation Server Project 25

    E-Print Network [OSTI]

    1 Simulation Server for Project 25: Inter-RF Subsystem Interface (ISSI) September 30, 2011 Simulation Server v1.0.0 #12;2 1. Executive Overview..................................................................................................................... 5 3.1. Starting the Server

  18. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01T23:59:59.000Z

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  19. Contract/Project Management

    Office of Environmental Management (EM)

    Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and...

  20. St. Bernard Project Update

    Broader source: Energy.gov [DOE]

    The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

  1. Contract/Project Management

    Energy Savers [EERE]

    Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

  2. Contract/Project Management

    Energy Savers [EERE]

    in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

  3. RESEARCH PROJECTS February 13

    E-Print Network [OSTI]

    Schenato, Luca

    will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration systems for heating and cooling in Mediterranean climate PROJECT REFERENCE: 218895 CALL: FP7-ENERGY-2007

  4. Portsmouth Paducah Project Office

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the Portsmouth...

  5. Offshore Wind Project Map

    Broader source: Energy.gov [DOE]

    Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

  6. Y-12 Steam Plant Project Received National Recognition for Project...

    National Nuclear Security Administration (NNSA)

    Steam Plant Project Received National Recognition for Project Management Excellence | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  7. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  8. The Mississippi CCS Project

    SciTech Connect (OSTI)

    Doug Cathro

    2010-09-30T23:59:59.000Z

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  9. Black Pine Circle Project

    ScienceCinema (OSTI)

    Mytko, Christine

    2014-09-15T23:59:59.000Z

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  10. Baytown Energy Project

    E-Print Network [OSTI]

    Porter, J.

    2006-01-01T23:59:59.000Z

    which maximize the yield of saleable products. Distillation towers consume most of the energy required for aromatics separation. BEP reconfigured the existing towers in the product recovery section to a new fractionation scheme. The new... and toluene sidestream from the primary benzene recovery tower. The result was a 30% reduction in energy in the benzene/toluene fractionation area. The project also debottlenecked the toluene disproportionation unit by 20%. The project was completed...

  11. Black Pine Circle Project

    SciTech Connect (OSTI)

    Mytko, Christine

    2014-03-31T23:59:59.000Z

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  12. BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)

    E-Print Network [OSTI]

    BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project (Beacon) Sponsor: Beacon Solar, LLC (Beacon Solar), a Delaware limited liability company and wholly owned and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County

  13. GREEN JOBS PROJECT Daniel Kammen

    E-Print Network [OSTI]

    Kammen, Daniel M.

    GREEN JOBS PROJECT Memo Daniel Kammen Meng Cai Karim El Alami December 2nd , 2014 #12;Contents.............................................................................................................................................3 1 Base of the Green jobs project per state ........................................................................................3 1.1 The Green jobs project from 2009

  14. ENLACE Mentor Project **.......................................................... Student Affairs

    E-Print Network [OSTI]

    de Lijser, Peter

    1 2 2 3 3 4 4 1 ENLACE Mentor Project .......................................................................... 5 #12;ENLACE Mentor Project Program Description: The ENLACE Mentor Project is designed to encourage employment opportunities, counseling, peer mentoring, faculty mentoring, academic and career advisement

  15. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15T23:59:59.000Z

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  16. Sustainable Places Project/Project Connect

    E-Print Network [OSTI]

    Spillar, R.; Arguello, J.

    2013-01-01T23:59:59.000Z

    Needs and Opportunities Project Details System: Corridors and Gaps System Optimization Funding Organization All answered…at the system level ESL-KT-13-12-50 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 14...1Presented to: Clean Air Trough Energy Efficiency CATEE Conference San Antonio December 18, 2013 ESL-KT-13-12-50 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 2• Capital Metro jurisdiction, and prior...

  17. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management Plan ExamplesProject

  18. Portsmouth/Paducah Project Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paducah Site Recovery Act project director. Recovery Act Projects East End Smelter - Recovery Act funding accelerated by 22 years the cleanup and demolition of a...

  19. National Ignition Facility project execution plan

    SciTech Connect (OSTI)

    Paisner, J., LLNL

    1997-08-01T23:59:59.000Z

    This project execution plan covers: Justification of Mission Need; Project Description; Management Roles and Responsibilities; Project Execution; Method of Accomplishment.

  20. Renewable Energy & Energy Efficiency Projects: Loan Guarantee...

    Energy Savers [EERE]

    Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Plenary III: Project Finance...

  1. 1 October, 2012 PROJECT COMMISSIONING FOR SMALL PROJECTS

    E-Print Network [OSTI]

    Kamat, Vineet R.

    1 October, 2012 PROJECT COMMISSIONING FOR SMALL PROJECTS This procedure defines the process for performing construction-phase commissioning (Cx) on small projects, typically projects consisting of a single system with a few pieces of equipment. When the process is performed by an external commissioning firm

  2. Perspectives on Project Finance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Perspectives on Project Finance Perspectives on Project Finance Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern...

  3. GEOL 5303 Project Presentations Presenter name: ______________________________________________

    E-Print Network [OSTI]

    Smith-Konter, Bridget

    pertinent materials. 10 7 4 0 Conclusion: What did you learn? Presenter summarizes total project (triumphsGEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb

  4. 2020 Vision Project Summary

    SciTech Connect (OSTI)

    Gordon, K.W.; Scott, K.P.

    2000-11-01T23:59:59.000Z

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

  5. Instrument validation project

    SciTech Connect (OSTI)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01T23:59:59.000Z

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  6. Radiation Embrittlement Archive Project

    SciTech Connect (OSTI)

    Klasky, Hilda B [ORNL] [ORNL; Bass, Bennett Richard [ORNL] [ORNL; Williams, Paul T [ORNL] [ORNL; Phillips, Rick [ORNL] [ORNL; Erickson, Marjorie A [ORNL] [ORNL; Kirk, Mark T [ORNL] [ORNL; Stevens, Gary L [ORNL] [ORNL

    2013-01-01T23:59:59.000Z

    The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

  7. Project Management Plan Chinese Food

    E-Print Network [OSTI]

    Igusa, Kiyoshi

    impact of this project? · Data management: How do we collect, preserve and sort all of the files? Which special equipment, facilities needed or wanted? According to http://project-management-knowledge.com/ weProject Management Plan Chinese Food According to NSF, the basic elements of a project management

  8. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  9. Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source

    E-Print Network [OSTI]

    Slatton, Clint

    Estimated Annual Amount For Amount Source STATE UNIVERSITY SYSTEM 2012-2013 Fixed Capital Outlay ProjectsProject Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description that will respond to the latest trends in small-group learning, technology resources, and collaboration spaces

  10. 3. PROJECT GOVERNANCE 1. Introduction

    E-Print Network [OSTI]

    3. PROJECT GOVERNANCE 1. Introduction In October 2010, the CEI UPF-Icŕria project, led by Pompeu Fabra University (UPF), was named an International Campus of Excellence (CEI). The project defined a set I. CEI UPF-Icŕria governance model Source: CEI UPF-Icŕria project The specific purpose of each unit

  11. MASTER OF SCIENCE Enterprise Project

    E-Print Network [OSTI]

    Yang, Eui-Hyeok

    the traditional tools, tactics, and PMI certification preparation taught in most project management programs MASTER OF SCIENCE According to PMI, the median salary of a project manager with 10 years of project management experience is $105K. According to the Project Management Institute (PMI), "Between 2006 and 2016

  12. Biofuels: Project summaries

    SciTech Connect (OSTI)

    Not Available

    1994-07-01T23:59:59.000Z

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  13. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect (OSTI)

    BARTONE, ERIK

    2010-09-28T23:59:59.000Z

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  14. Solar Dish Project

    SciTech Connect (OSTI)

    Robert F. Boehm

    2004-06-06T23:59:59.000Z

    (Original wording, now somewhat outdated.) The Nevada Solar Dish Project is designed to deploy at least 1 MW of dish-based, field validation power generation systems in a mini-power plant near Las Vegas, Nevada, as a transitional precursor to the full commercialization of the technology. This will occur over a period of about three years, from 2001 through 2004. The statement of work defines activities that the University of Nevada Las Vegas (UNLV) will provide by establishing a test site for two dish/Stirling systems on the UNLV campus and providing operation, test and training, and education in support of the project.

  15. Integrated Project Team RM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment of EnergyIndustry Research ProjectIntegrated Project Team (IPT)

  16. Joint IAEA/NNSA International Workshop Nuclear Forensics Methodologies for Practitioners 2013 Scenario Based Exercise – Version 4.0 Instructor’s Manual

    SciTech Connect (OSTI)

    Schwantes, Jon M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Douglas, Matthew [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Morley, Shannon M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Hill, David [Australian Nuclear Science and Technology Organization, New South Wales (Australia); Thompson, Paul [AWE, Aldermasten (United Kingtom); Santi, Peter [Los Alamos National Laboratory (LANL), Los Alamos, NM (United States); Gassman, Paul L. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Meier, David E. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Pierson, Richard M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Wallenius, Maria [European Commission, Inst. for Transuranium Elements, Karlsruhe, (Germany); Marks, Naomi [Lawrence Livermore National Laboratory (LLNL), Livermore, CA (United States)

    2013-10-01T23:59:59.000Z

    [Participants will serve as border guards for Reimerland. They will be given brief instruction on the operation of hand?held RadioIsotope DetectorS (RIDS) and be provided an intelligence briefing that tells them to be on the lookout for suspicious activity at their post. Their instruction will include directing suspicious vehicles to a location for secondary screening. If, after secondary screening, suspicions of a criminal act involving nuclear and or radioactive materials remain, participants have been instructed to request assistance from the NLEA, who will then setup and manage a radiological crime scene. Participants will watch a demonstration of two vehicles containing radioactive materials driving through and setting off a portal monitor. The first vehicle, a semi?tractor trailer, sets off only a gamma alarm. After the driver provides a shipping manifest of fertilizer, participants, posing as border guards, are expected to waive this vehicle through inspection. The second vehicle, an SUV, set off both gamma and 2 neutron alarms. The alarming of the neutron monitor should prompt participants to set up a secondary inspection of the vehicle immediately. The driver of the vehicle indicates he is in legal possession of an industrial instrument containing an old 133Ba source that has decayed to a level no longer requiring official paperwork according to the IAEA and internationally accepted transportation regulations. Authorities have verified that the industrial source does fit the description of one that is sold commercially. However, upon setting up a secondary screening, participants will use hand?held detectors to locate several other radioactive sources emanating from a black duffle bag in the rear of the vehicle (Figure 1). Hand held detectors detect the presence of 133Ba, and Pu. Upon questioning, the driver only commits to having the 133Ba industrial source and cannot account for the detection of neutrons within his vehicle. Since neutron alarms also sounded, participants should indicate that a neutron alarm would be inconsistent with a 133Ba source alone and should therefore conclude further investigation is warranted. This will prompt participants to call in a response team from the NLEA to set up a radiological crime scene around the vehicle in question. The response team is able to shoot a 3?D X?ray radiograph of the duffle bag without moving it to ensure it is rendered safe and moveable without disturbing the contents in the field (Figure 2). At this point, the duffle bag is entered into inventory as evidence and a chain of custody form is initiated. Swipes are taken from the outer bag to confirm there is no dispersible contamination. The bag and its contents are considered valuable for the investigation by the lead investigator. He determines the duffle bag is safe to transport to RRL for evidence inventory and analysis. The duffle bag and its contents are packaged and sent off to the RRL.

  17. New Project Opportunities

    E-Print Network [OSTI]

    Michelson, David G.

    and heavy mineral concentrates. Basic and advanced mineral characterization of various PIMS minerals has, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps with industry partners for 2014 and beyond. We are looking for Expressions of Interest from potential partners

  18. ISOE Pilot Project Update

    SciTech Connect (OSTI)

    D. A. Hagemeyer D. E. Lewis

    2012-05-05T23:59:59.000Z

    This slide show introduces the Pilot Project to increase the value of Information System on Occupational Exposure (ISOE)#11;data by increasing participation and amount of data reported from the U.S., reduce the hurdles and effort in participating, streamline the process of reporting and reduce time delay, and eliminate data entry and redundant effort.

  19. Information Technology Project Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12T23:59:59.000Z

    This Guide provides Department of Energy recommended guidelines to ensure that the acquisition of information technology capital assets is performed in compliance with DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE N 251.105.

  20. Project Summary Partnership Inspiration

    E-Print Network [OSTI]

    Everest, Graham R

    %. This earned Adnams the CRed Business Standard (a systematic framework for reducing carbon based energy costs Businesses are hunting for solutions to reduce their carbon footprint and energy spend. This project follows as 6 tonnes of CO2 per employee. The Carbon Trust estimates that UK businesses waste 30% energy through

  1. MINERAL FACILITIES MAPPING PROJECT

    E-Print Network [OSTI]

    Gilbes, Fernando

    MINERAL FACILITIES MAPPING PROJECT Yadira Soto-Viruet Supervisor: David Menzie, Yolanda Fong-Sam Minerals Information Team (MIT) USGS Summer Internship 2009 U.S. Department of the Interior U.S. Geological Minerals Information Team (MIT): Annually reports on the minerals facilities of more than 180 countries

  2. Baytown Cogeneration Project

    E-Print Network [OSTI]

    Lorenz, M. G.

    2007-01-01T23:59:59.000Z

    The Baytown Cogeneration Project installed a GE 7FA gas turbine generator that produces 160 MW of electricity and 560-klB/hr of superheated 1500-psig steam. All of the steam and electricity are consumed by the ExxonMobil Refinery & Chemical Plant...

  3. Environmental of Forestry Projects

    E-Print Network [OSTI]

    Environmental Impact Assessment of Forestry Projects #12;EnvironmentalImpactAssessment 2 Flow chart Details of the Environmental Statement publicised for comment FC considers ES and any comments received FC the issues of concern that need to be covered in the Environmental Statement (ES). The Environmental

  4. Scientific Motivation Project Overview

    E-Print Network [OSTI]

    van Dyk, David

    and Tracking of Solar Features David Stenning1 Vinay Kashyap2 Thomas Lee3 David van Dyk4 C. Alex Young5 1 Flight Center Stenning, David Automatic Classifying and Tracking of Solar Features #12;Scientific Classifying and Tracking of Solar Features #12;Scientific Motivation Project Overview Methodology Results

  5. COFIN project Concentration Fluctuations

    E-Print Network [OSTI]

    COFIN project Concentration Fluctuations in Gas Releases by Industrial Accidents Final Summary of random concentration fluctuations in hazardous gas releases and the method was to derive empirical. In each measurement cycle the Lidar emits a short laser light pulse and detects the light Lidar reflected

  6. Baytown Cogeneration Project 

    E-Print Network [OSTI]

    Lorenz, M. G.

    2007-01-01T23:59:59.000Z

    The Baytown Cogeneration Project installed a GE 7FA gas turbine generator that produces 160 MW of electricity and 560-klB/hr of superheated 1500-psig steam. All of the steam and electricity are consumed by the ExxonMobil Refinery & Chemical Plant...

  7. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan [Howard University

    2013-06-20T23:59:59.000Z

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  8. Pioneering Heat Pump Project

    Broader source: Energy.gov [DOE]

    Project objectives: To install and monitor an innovative WaterFurnace geothermal system that is technologically advanced and evolving; To generate hot water heating from a heat pump that uses non-ozone depleting refrigerant CO2. To demonstrate the energy efficiency of this system ground source heat pump system.

  9. Project Title: Residential wind turbine design Project Description: This project aims to

    E-Print Network [OSTI]

    Muradoglu, Metin

    that wind is expected to come. Therefore it may be a good idea to consider a vertical-axis wind turbine of the conventional wind turbines use horizontal- axis configuration (see Fig. 1) and is aligned with the directionPROJECT 1: Project Title: Residential wind turbine design Project Description: This project aims

  10. Ceramic Technology Project

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  11. Paul Glowaski: Garden Director, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01T23:59:59.000Z

    Regional History Project, University Library, 2003) http://History Project, University Library, UCSC, 1996. ) http://

  12. California Hydrogen Infrastructure Project

    SciTech Connect (OSTI)

    Edward C. Heydorn

    2013-03-12T23:59:59.000Z

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ���¢��������real-world���¢������� retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation���¢��������s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products���¢�������� Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user���¢��������s fueling experience.

  13. Evaluation of Technology Risk in Project Cogeneration Project Returns

    E-Print Network [OSTI]

    Thoennes, C. M.

    The economic returns of a cogeneration project are a direct function of the project margin, that is, the difference between revenues and expenses. Revenues and expenses, of course, are made up of both variable and fixed components. The revenues...

  14. NEPA COMPLIANCE SURVEY Project Information Project Title: Liner...

    Broader source: Energy.gov (indexed) [DOE]

    Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1....

  15. PROJECT SELF-EVALUATION METHODOLOGY: THE HEALTHREATS PROJECT CASE STUDY

    E-Print Network [OSTI]

    Bohanec, Marko

    PROJECT SELF-EVALUATION METHODOLOGY: THE HEALTHREATS PROJECT CASE STUDY Martin Znidarsic1 , Marko, Slovenia e-mail: martin.znidarsic@ijs.si Tel: +386 1 477 3366; fax: +386 1 477 3315 ABSTRACT The paper

  16. NEPA COMPLIANCE SURVEY Project Information Project Title: T-2...

    Broader source: Energy.gov (indexed) [DOE]

    T-2-33 Date: 12-22-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfree Project Overview 1. What are the environmental The existing manifold building will be moved off...

  17. The Multimedia Project Quarked!

    E-Print Network [OSTI]

    Bean, Alice

    2011-01-01T23:59:59.000Z

    Can exposure to fundamental ideas about the nature of matter help motivate children in math and science and support the development of their understanding of these ideas later? Physicists, designers, and museum educators at the University of Kansas created the Quarked!(tm) Adventures in the subatomic Universe project to provide an opportunity for youth to explore the subatomic world in a fun and user friendly way. The project components include a website (located at http://www.quarked.org) and hands-on education programs. These are described and assessment results are presented. Questions addressed include the following. Can you engage elementary and middle school aged children with concepts related to particle physics? Can young children make sense of something they can't directly see? Do teachers think the material is relevant to their students?

  18. Healy Clean Coal Project

    SciTech Connect (OSTI)

    None

    1997-12-31T23:59:59.000Z

    The Healy Clean Coal Project, selected by the U.S. Department of Energy under Round 111 of the Clean Coal Technology Program, has been constructed and is currently in the Phase 111 Demonstration Testing. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the U.S. Department of Energy. Construction was 100% completed in mid-November of 1997, with coal firing trials starting in early 1998. Demonstration testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of nitrogen oxides (NOx), sulfur dioxide (S02), and particulate from this 50-megawatt plant are expected to be significantly lower than current standards.

  19. Debt collection project report

    SciTech Connect (OSTI)

    Not Available

    1980-05-01T23:59:59.000Z

    In October 1979 the Office of Management and Budget initiated a review of debt collection within the Federal Government. A DOE Debt Collection Project Team was established, and seven activites were selected for review. These were Albuquerque Operations Office; Bonneville Power Administration; Chicago Operations and Regional Office; Naval Petroleum Reserves, California; Oak Ridge Operations Office; Washington Financial Services Division; and Western Area Power Administration. The team visited each of these activities to collect data on the size, age, and types of receivables managed and procedures for billing, aging, and handling overdue accounts. Various deficiencies were found to exist at several of the DOE entities that are not consistent with good management practices in the performance of their debt collection functions. Also, the Debt Collection Project Team identified a wide variation in the procedures followed by DOE activities in the management of accounts receivable, and a wide variation in the effectiveness of the debt management functions. 1 figure, 17 tables. (RWR)

  20. Nucla CFB Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-12-01T23:59:59.000Z

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  1. Moisture Metrics Project

    SciTech Connect (OSTI)

    Schuchmann, Mark

    2011-08-31T23:59:59.000Z

    the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

  2. Saudi MTBE project revived

    SciTech Connect (OSTI)

    NONE

    1996-01-17T23:59:59.000Z

    Alujain Corp., a member of the Xenel group of Saudi Arabia, is going ahead with plans to build an 800,000-m.t./year methyl tert-butyl ether (MTBE) plant. Bechtel has been appointed project manager for the plant, which will be owned by a new company, National Fuel Additives (Tahseen). Bechtel will help evaluate proposals already submitted for the lump sum turnkey job.

  3. Cogeneration Project Analysis Update

    E-Print Network [OSTI]

    Robinson, A. M.; Garcia, L. N.

    diverse factors, such as, but no limited to: Fuel Considerations, Heat System Analysis, Electric Power Considerations, Key Technical Project Considerations, and Economic Analysis. INTRODUCTION The cogeneration systems being developed for industrial... power marched upward at a higher rate than fuel, capital equipment cost, and the prime interest rate. Typical Cogeneration System One system has been chosen as typical. This is one of the cogeneration systems which have proliferated over the past...

  4. Awarded ESPC Projects

    Broader source: Energy.gov [DOE]

    Since the inception of the U.S. Department of Energy's (DOE) energy savings performance contracts (ESPCs) in 1998, 325 DOE ESPC projects have been awarded. More than $3.41 billion has been invested in Federal energy efficiency and renewable energy improvements. These improvements have resulted in more than 398 trillion Btu life cycle energy savings and more than $8.53 billion of cumulative energy cost savings for the Federal Government.

  5. Advanced thyristor valve project

    SciTech Connect (OSTI)

    Damsky, B.L.

    1984-01-01T23:59:59.000Z

    General Electrics's thyristor valve project incorporates the most advanced technologies available. With joint funding from the Electric Power Research Institute, commercial application of the separate light-triggered thyristor is now underway. The cesium vapor lamp source to trigger the light sensitive thyristors will reduce component complexity and cost. A unique thermal management feature relies on forced vaporization cooling with Freon-113, which equals the thermal performance of water without posing insulation reliability problems. 7 figures.

  6. Robotics research projects report

    SciTech Connect (OSTI)

    Hsia, T.C. (ed.)

    1983-06-01T23:59:59.000Z

    The research results of the Robotics Research Laboratory are summarized. Areas of research include robotic control, a stand-alone vision system for industrial robots, and sensors other than vision that would be useful for image ranging, including ultrasonic and infra-red devices. One particular project involves RHINO, a 6-axis robotic arm that can be manipulated by serial transmission of ASCII command strings to its interfaced controller. (LEW)

  7. Sandia National Laboratories: Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiationImplementingnpitche Home AboutMeeting: ProgramFebruaryJunePowerProjects Threat

  8. Milliwatt Generator Project

    SciTech Connect (OSTI)

    Latimer, T.W.; Rinehart, G.H.

    1992-05-01T23:59:59.000Z

    This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTGS) and MC3599 heat sources (4.5 W) for MC3500 RTGs. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTGs). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

  9. Surfactant EOR project evaluated

    SciTech Connect (OSTI)

    Holm, L.W.

    1984-07-16T23:59:59.000Z

    The Union Oil Co.'s Uniflood process has successfully mobilized and produced tertiary oil from a micellar-polymer pilot project on the Hegberg lease in the El Dorado field, Kansas. This half-completed EOR flood has recovered over 11% of the waterflood residual oil and is currently producing at an oil cut of 10%. Oil recovery has been limited by (1) the presence of gypsum in portions of the reservoir which adversly affects injected chemicals, (2) poor quality reservoir rock in one quadrant of the pilot, and (3) a substantial fluid drift (30 ft/year) which causes a portion of the injected chemicals to flow out of the pilot pattern. The El Dorado demonstration project is a joint experiment covered by a cost-sharing contract between the U.S. Department of Energy and Cities Service Company. It was proposed as a micellar-polymer process in a highly saline (10 wt % salts) reservoir that had been waterflooded to residual oil. Despite the extended project life, and indications that total recovery efficiency will be less than originally predicted, oil response in the Hegberg pattern is encouraging for application of the micellar-polymer process in high brine reservoirs.

  10. Final Project Report

    SciTech Connect (OSTI)

    Bogucz, E A

    2010-12-13T23:59:59.000Z

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  11. NREL Smart Grid Projects

    SciTech Connect (OSTI)

    Hambrick, J.

    2012-01-01T23:59:59.000Z

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  12. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  13. The Human Genome Diversity Project

    SciTech Connect (OSTI)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31T23:59:59.000Z

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  14. The Boeing Company Project Fuel Tank Design Project Recap

    E-Print Network [OSTI]

    Demirel, Melik C.

    which consist of a 15o double angle displacement, 10 to 12 oscillations per minute oscillation frequencyThe Boeing Company Project Fuel Tank Design Project Recap The Boeing Company came to the Pennsylvania State University with a project for the mitigation of fuel slosh by utilizing different baffle

  15. LATEST PROJECTS & Preview a few of our latest research projects

    E-Print Network [OSTI]

    California at Davis, University of

    , disseminate informa- tion, and facilitate programs that reduce cooling system electrical demand and energy applied research through Western Cooling Challenge Demonstrations and many other ongoing projects. Our feaLATEST PROJECTS & UPDATES Preview a few of our latest research projects & updates pg. 10 OUTREACH

  16. Uncompahgre Mesas Forest Restoration Project

    E-Print Network [OSTI]

    March 2010 Uncompahgre Mesas Forest Restoration Project Collaboration Case Study #12;Uncompahgre Mesas Forest Restoration Project 1 1 Colorado Forest Restoration Institute Collaboration Case Study at Colorado State University, to conduct case studies of two collaborative forest health efforts

  17. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  18. Risk Management In Major Projects 

    E-Print Network [OSTI]

    Baker, Scott William

    The integration of risk management in major projects within the construction and oil and gas industries has never been more significant especially as these projects are becoming larger and more complex. The increased ...

  19. Texas Stream Team Special Projects

    E-Print Network [OSTI]

    Texas Stream Team Special Projects · TMDL and Watershed Protection Plan Projects · Steering ­ Transparency tube ­ E. coli · Web site resources · Materials ­ Maps, Watershed Models Orange County Adams training sessions · Quality control · NPS education sessions · Volunteers of the month · Orange county

  20. Project Approval Form Concentration in

    E-Print Network [OSTI]

    Goldberg, Bennett

    Project Approval Form Concentration in Nanotechnology Return completed form to ENG Undergraduate of Graduation:____________________________ Instructions: Please check one of the following ways in which you Plan to complete the project as a requirement for the concentration in Nanotechnology. Depending upon

  1. ADVANCE! Leadership Experience Project Guidelines

    E-Print Network [OSTI]

    Hone, James

    ADVANCE! Leadership Experience Project Guidelines Fieldwork Practicum Description: The fieldwork component of the ADVANCE! leadership program offers students the opportunity to integrate theory exposure to that industry. Together, they design a leadership project in which the student takes an active

  2. PETITION FOR INSIGNIFICANT PROJECT MODIFICATION

    E-Print Network [OSTI]

    Cosumnes River Boulevard Interchange SMUD Cogeneration Pipeline Project Docket No. 92-AFC-2P July 2007, CA 95833 #12;SMUD COGENERATION PIPELINE PROJECT Table of Contents K:\\Wprocess\\25832\\SMUD

  3. Geothermal Outreach and Project Financing

    SciTech Connect (OSTI)

    Elizabeth Battocletti

    2006-04-06T23:59:59.000Z

    The ?Geothermal Outreach and Project Financing? project substantially added to the understanding of geothermal resources, technology, and small business development by both the general public as well as those in the geothermal community.

  4. Trotter's product formula for projections

    E-Print Network [OSTI]

    Shvydkoy, Roman

    -semigroup etB is replaced by the simplest of degenerate semigroups, i.e. a projection P L P denotes a bounded projection. Now, in (1) we replace the C0-semigroup etB by the continuous

  5. ESPC Project Developer's Resource Guide

    Energy Savers [EERE]

    in the charts, and are identified alongside additional detail in Section 4. 4 *Items in blue are project deliverables. 5 *Items in blue are project deliverables. 6 *Items in blue...

  6. Executing major projects through Contractors

    E-Print Network [OSTI]

    McKenna, Nicholas A. (Nicholas Alan)

    2005-01-01T23:59:59.000Z

    Project based organizational structures are utilized in many industries. The firms engaged in these significant endeavors, project sponsor and contractor alike, risk both capital and reputation in the market-place with ...

  7. TSSWCB Bacteria-Related Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  8. Addendum to Fake Projective Planes

    E-Print Network [OSTI]

    Yeung, Sai-Kee

    ingenious group theoretic computations that the twenty eight classes of fake projective planes altogether- damental group of eight of the one hundred fake projective planes do not admit an embedding into SU(2, 1. In [1] we proved that if the fundamental group of a fake projective plane is an arithmetic subgroup

  9. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden M A N X I N G D U in upgrading their network capacity. However, an important conclusion from this thesis project be more efficient. It should be noted that the mobile terminals covered in the project are connected

  10. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems First level, 15.0 HEC Stockholm, Sweden R A F I D K A R I M is considered by many to be a driving force in the next generation Internet. This project uses very in expensive the desired user functionality. This bachelor's thesis project made it possible for a PoE powered circuit

  11. Muddy River Restoration Project Begins

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Muddy River Restoration Project Begins Page 5 #12;2 YANKEE ENGINEER February 2013 Yankee Voices of the Muddy River Restoration project. Inset photo: Flooding at the Muddy River. Materials provided by Mike Project Manager, on the passing of his father in law, Francis James (Jim) Murray, Jan. 9. ... to Laura

  12. PI & Project Team PAF Changes

    E-Print Network [OSTI]

    Shyy, Wei

    Proposal Management PI & Project Team PAF Changes Step-By-Step Procedures Last updated: 4/1/2013 1 of 10 http://eresearch.umich.edu PAF Changes This procedure details how the PI & Project Team can: Make. Page 9 Important Information Before a PAF is routed for approval, the PI & Project Team can make

  13. Office: ITO PE/Project

    E-Print Network [OSTI]

    Mills, Kevin

    Mgr.: Mills/Swinson PAD No.: Smart Spaces Moving Through Smart Spaces "city-wide appliances" "in1 DARPA Office: ITO PE/Project: Pgm No.: Pgm Mgr.: Mills/Swinson PAD No.: Smart Spaces Personal Information Projection · Develop techniques for projecting personal information from cyberspace into smart

  14. Project Earth Lover

    SciTech Connect (OSTI)

    Slobotski, Stephanie,

    2011-09-01T23:59:59.000Z

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  15. The STACEE Project

    E-Print Network [OSTI]

    Ong, R A; Ong, Rene A.; Covault, Corbin E.

    1997-01-01T23:59:59.000Z

    The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

  16. The STACEE Project

    E-Print Network [OSTI]

    Rene A. Ong; Corbin E. Covault

    1997-11-25T23:59:59.000Z

    The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

  17. CLIC Project Overview

    ScienceCinema (OSTI)

    Andrea Latina

    2010-01-08T23:59:59.000Z

    The CLIC study is exploring the scheme for an electron-positron collider with a centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The current goal of the project is to demonstrate the feasibility of the technology by the year 2010. Recently, important progress has been made concerning the high-gradient accelerating structure tests and the experiments with beam in the CLIC test facility, CTF3. On the organizational side, the CLIC international collaborations have significantly gained momentum, boosting the CLIC study.

  18. CLIC Project Overview

    SciTech Connect (OSTI)

    Andrea Latina

    2009-06-10T23:59:59.000Z

    The CLIC study is exploring the scheme for an electron-positron collider with a centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The current goal of the project is to demonstrate the feasibility of the technology by the year 2010. Recently, important progress has been made concerning the high-gradient accelerating structure tests and the experiments with beam in the CLIC test facility, CTF3. On the organizational side, the CLIC international collaborations have significantly gained momentum, boosting the CLIC study.

  19. NDLGS project update

    SciTech Connect (OSTI)

    Lienert, Thomas J [Los Alamos National Laboratory; Sutton, Jacob O [Los Alamos National Laboratory; Piltch, Martin S [Los Alamos National Laboratory; Lujan, Dennis J [Los Alamos National Laboratory

    2011-01-14T23:59:59.000Z

    Recent results for laser and ESD processing for the NDLGS project will be reviewed. Conclusions are: (1) Short mix passes have profound effect on window T; (2) Multiple drill and re-weld at single location has been shown to be feasible and successful; (3) Kapton beam profiling method has been successfully developed. Comparison of 100 mm and 120 mm lenses gives reasonable and consistent results; (4) Manifold pumpdown data has been presented; (5) ESO results can be accurately predicted once a repeatable efficiency has been established; and (6) The electrode-workpiece geometry may play an important on ESO efficiency. Experiments are planned to investigate these effects.

  20. Investor Confidence Project

    E-Print Network [OSTI]

    Golden, M.

    2013-01-01T23:59:59.000Z

    Actionable Data ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Near-Term: Not Enough Deal-Flow • High Transaction Costs • Lack of Viable Origination Channels • Highly Variable Performance • Complex... Custom Projects ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Long-Term: High Cost of Capital • More equity than debt • Not enough volume to securitize • Insufficient actuarial data...

  1. Autostereoscopic projection viewer

    DOE Patents [OSTI]

    Toeppen, John S. (Livermore, CA)

    2006-12-19T23:59:59.000Z

    An autostereoscopic viewer is employed to produce aberration corrected images to simulate a virtual presence by employing pairs of projector optical components coupled with an image corrector plate and a field lens. Images are designed with magnifications and optical qualities and positioned at predetermined eyezones having controlled directional properties. The viewer's eyes are positioned in these eyezones. The size of these zones is related to the aperture of the projection lenses, the magnification produced by the Fresnel(s), and the optical properties and position of the image corrector plate.

  2. Rabbit Project Reference Manual

    E-Print Network [OSTI]

    Wootton, Chad

    2000-05-04T23:59:59.000Z

    breed or produc- tion standards whenever possible to 4-H mem- bers or other people wishing to raise rabbits. You might sell fryers live to commercial rab- bit processors or to laboratory animal suppli- ers. Or, dress and sell the fryers to friends, rela... or more litters are raised. Offspring are sold for breed stock and show animals. Members should also market the young. Members are encouraged to use pure- bred commercial breeds for this project, al- though crossbred rabbits are acceptable. Mem- bers must...

  3. PSERC Current Projects Overview

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT1OE0000652

  4. Project Execution Plan RM

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProject Develops

  5. Project Management Practices

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProject DevelopsDepartmentACQUISITION

  6. Step 4: Project Implementation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurringSteam Systems Steam Systems4: Project

  7. PROJECT TASK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO Website Directory PPPO WebsitePREP |Dan5,PROJECT TASK

  8. Project Submission Template

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of Energy TEESAdoptionCooperation Project

  9. NREL: Biomass Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Saleshttp://www.fnal.gov/directorate/nalcal/nalcal02_07_05_files/nalcal.gifNREL NRELChemical and CatalystNew ChallengesProjects

  10. Projects & Initiatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  11. Projects | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn

  12. CNEEC - Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About Batteries BatteriesCAESMission Welcome to theProjects CNEEC

  13. ARM Observations Projected

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProducts (VAP) VAP Update Information on new, existing, andObservations Projected

  14. Searchlight Wind Energy Project FEIS Appendix E

    Office of Environmental Management (EM)

    June 2, 2009 District Las Vegas Field Office Resource Area Activity (program) Proposed Wind Generation SECTION A. PROJECT INFORMATION 1. Project Name Searchlight Wind Project 4....

  15. EMP: Earth Microbiome Project | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data-Intensive Science Applied Mathematics Science & Engineering Applications EMP: Earth Microbiome Project EMP: Earth Microbiome Project The Earth Microbiome Project is a...

  16. Infrastructure and Operations Improvement Project Director |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project risks. -Ensure that required and effective project management and control systems are developed, deployed and implemented to successfully manage and assess the project...

  17. Energy Savings Performance Contract Project Facilitators | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    developing U.S. Department of Energy (DOE) energy savings performance contract (ESPC) projects are required to work with a qualified project facilitator. Project...

  18. SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...

    Office of Environmental Management (EM)

    Project Tracking Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist The following checklist is intended to provide system owners, project...

  19. SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...

    Broader source: Energy.gov (indexed) [DOE]

    PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist The following checklist is intended to provide system owners, project...

  20. Renewable energy projects approved | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable energy projects approved Renewable energy projects approved July 30, 2008 - 3:13pm Addthis CARSON CITY, Nev.-Two renewable energy projects representing a 100...

  1. Tribal Renewable Energy Advanced Course: Project Development...

    Broader source: Energy.gov (indexed) [DOE]

    slides. This course provides in-depth information on project development concepts for renewable energy projects on tribal lands, including: Risk and uncertainty Tribal project...

  2. DOE Energy Challenge Project

    SciTech Connect (OSTI)

    Frank Murray; Michael Schaepe

    2009-04-24T23:59:59.000Z

    Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

  3. Projection optics box

    DOE Patents [OSTI]

    Hale, Layton C. (Livermore, CA); Malsbury, Terry (Tracy, CA); Hudyma, Russell M. (San Ramon, CA); Parker, John M. (Tracy, CA)

    2000-01-01T23:59:59.000Z

    A projection optics box or assembly for use in an optical assembly, such as in an extreme ultraviolet lithography (EUVL) system using 10-14 nm soft x-ray photons. The projection optics box utilizes a plurality of highly reflective optics or mirrors, each mounted on a precision actuator, and which reflects an optical image, such as from a mask, in the EUVL system onto a point of use, such as a target or silicon wafer, the mask, for example, receiving an optical signal from a source assembly, such as a developed from laser system, via a series of highly reflective mirrors of the EUVL system. The plurality of highly reflective optics or mirrors are mounted in a housing assembly comprised of a series of bulkheads having wall members secured together to form a unit construction of maximum rigidity. Due to the precision actuators, the mirrors must be positioned precisely and remotely in tip, tilt, and piston (three degrees of freedom), while also providing exact constraint.

  4. Device Oriented Project Controller

    SciTech Connect (OSTI)

    Dalesio, Leo; Kraimer, Martin

    2013-11-20T23:59:59.000Z

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

  5. LIMB Demonstration Project Extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21T23:59:59.000Z

    The DOE LIMB Demonstration Project Extension is a continuation of the EPA Limestone Injection Multistage Burner (LIMB) Demonstration. EPA ultimately expects to show that LIMB is a low cost control technology capable of producing moderate SO{sub x} and NO{sub x} control (50--60 percent) with applicability for retrofit to the major portion of the existing coal-fired boiler population. The current EPA Wall-Fired LIMB Demonstration is a four-year project that includes design and installation of a LIMB system at the 105-MW Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. LIMB Extension testing continued during the quarter with lignosulfonated hydrated lime, pulverized limestone, and hydrated dolomitic lime while firing 1.8% and 3% sulfur coals. Sulfur dioxide removal efficiencies were equivalent to the results found during EPA, base LIMB testing. Sulfur dioxide removal efficiencies were lower than expected while testing with pulverized limestone without humidification. A slight increase in sulfur capture was noted while injecting pulverized limestone at the 187' elevation and with the humidifier outlet temperature at 145{degree}F.

  6. Waste Management Project Contingency Analysis

    SciTech Connect (OSTI)

    Edward L. Parsons, Jr.

    1999-08-31T23:59:59.000Z

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion.

  7. CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Estimated Project End Date

    E-Print Network [OSTI]

    Pennycook, Steve

    CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Phone Numbers: Project Manager: Field Representative: SHEST Representative: List of Hazardous Materials: Estimated Project End Date: Contractor/Service Subcontractor Name: Contractor/Service Subcontractor Address

  8. The Methanol Economy Project

    SciTech Connect (OSTI)

    Olah, George; Prakash, G.K.

    2013-12-31T23:59:59.000Z

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO{sub 2} capture using supported amines, co-electrolysis of CO{sub 2} and water to formate and syngas, decomposition of formate to CO{sub 2} and H{sub 2}, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields. ? Direct electrophilic bromination of methane to methyl bromide followed by hydrolysis to yield methanol was investigated on a wide variety of catalyst systems, but hydrolysis proved impractical for large-scale industrial application. ? Bireforming the correct ratio of methane, CO{sub 2}, and water on a NiO / MgO catalyst yielded the right proportion of H{sub 2}:CO (2:1) and proved to be stable for at least 250 hours of operation at 400 psi (28 atm). ? CO{sub 2} capture utilizing supported polyethyleneimines yielded a system capable of adsorbing CO{sub 2} from the air and release at nominal temperatures with negligible amine leaching. ? CO{sub 2} electrolysis to formate and syngas showed considerable increases in rate and selectivity by performing the reaction in a high pressure flow electrolyzer. ? Formic acid was shown to decompose selectively to CO{sub 2} and H{sub 2} using either Ru or Ir based homogeneous catalysts. ? Direct formic acid fuel cells were also investigated and showed higher than 40% voltage efficiency using reduced loadings of precious metals. A technoeconomic analysis was conducted to assess the viability of taking each of these processes to the industrial scale by applying the data gathered during the experiments to approximations based on currently used industrial processes. Several of these processes show significant promise for industrial scale up and use towards improving our nation’s energy independence.

  9. Developing Government Renewable Energy Projects

    SciTech Connect (OSTI)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01T23:59:59.000Z

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  10. NEPA COMPLIANCE SURVEY Project Information Project TitJe: Geothermal...

    Broader source: Energy.gov (indexed) [DOE]

    0 0 0 If the project involved disturbance of surface soils, are erosion 0 0 18 Total construction (disturtled) area is and storm water control measures addressed?...

  11. Applicant DOE Award Project Location Project Focus Feasibility...

    Broader source: Energy.gov (indexed) [DOE]

    Tribe's acquisition and subsequent operation of the Kerr Hydroelectric project as a wholesale power generation facility. Confederated Tribes of the Colville Reservation 200,000...

  12. Healy clean coal project

    SciTech Connect (OSTI)

    Not Available

    1992-08-01T23:59:59.000Z

    The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO[sub 2], NO[sub x], and particulates are expected to be significantly better than the federal New source Performance standards. During this past quarter, engineering and design continued on the boiler, combustion flue gas desulfurization (FGD), and turbine/generator systems. Balance of plant equipment procurement specifications continue to be prepared. Construction activities commenced as the access road construction got under way. Temporary ash pond construction and drilling of the supply well will be completed during the next quarter.

  13. Ribosomal Database Project II

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Ribosomal Database Project (RDP) provides ribosome related data and services to the scientific community, including online data analysis and aligned and annotated Bacterial small-subunit 16S rRNA sequences. As of March 2008, RDP Release 10 is available and currently (August 2009) contains 1,074,075 aligned 16S rRNA sequences. Data that can be downloaded include zipped GenBank and FASTA alignment files, a histogram (in Excel) of the number of RDP sequences spanning each base position, data in the Functional Gene Pipeline Repository, and various user submitted data. The RDP-II website also provides numerous analysis tools.[From the RDP-II home page at http://rdp.cme.msu.edu/index.jsp

  14. The Biocatalytic Desulfurization Project

    SciTech Connect (OSTI)

    David Nunn; James Boltz; Philip M. DiGrazia; Larry Nace

    2006-03-03T23:59:59.000Z

    The material in this report summarizes the Diversa technical effort in development of a biocatalyst for the biodesulfurization of Petro Star diesel as well as an economic report of standalone and combined desulfurization options, prepared by Pelorus and Anvil, to support and inform the development of a commercially viable process. We will discuss goals of the projected as originally stated and their modification as guided by parallel efforts to evaluate commercialization economics and process parameters. We describe efforts to identify novel genes and hosts for the generation of an optimal biocatalyst, analysis of diesel fuels (untreated, chemically oxidized and hydrotreated) for organosulfur compound composition and directed evolution of enzymes central to the biodesulfurization pathway to optimize properties important for their use in a biocatalyst. Finally we will summarize the challenges and issues that are central to successful development of a viable biodesulfurization process.

  15. Breckinridge Project, initial effort

    SciTech Connect (OSTI)

    none,

    1982-01-01T23:59:59.000Z

    The project cogeneration plant supplies electric power, process steam and treated boiler feedwater for use by the project plants. The plant consists of multiple turbine generators and steam generators connected to a common main steam header. The major plant systems which are required to produce steam, electrical power and treated feedwater are discussed individually. The systems are: steam, steam generator, steam generator fuel, condensate and feedwater deaeration, condensate and blowdown collection, cooling water, boiler feedwater treatment, coal handling, ash handling (fly ash and bottom ash), electrical, and control system. The plant description is based on the Phase Zero design basis established for Plant 31 in July of 1980 and the steam/condensate balance as presented on Drawing 31-E-B-1. Updating of steam requirements as more refined process information becomes available has generated some changes in the steam balance. Boiler operation with these updated requirements is reflected on Drawing 31-D-B-1A. The major impact of updating has been that less 600 psig steam generated within the process units requires more extraction steam from the turbine generators to close the 600 psig steam balance. Since the 900 psig steam generation from the boilers was fixed at 1,200,000 lb/hr, the additional extraction steam required to close the 600 psig steam balance decreased the quantity of electrical power available from the turbine generators. In the next phase of engineering work, the production of 600 psig steam will be augmented by increasing convection bank steam generation in the Plant 3 fired heaters by 140,000 to 150,000 lb/hr. This modification will allow full rated power generation from the turbine generators.

  16. Draft Advanced Nuclear Energy Projects Solicitation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced Nuclear Energy Projects Solicitation More Documents & Publications Draft...

  17. Overcoming Common Pitfalls: Energy Efficient Lighting Projects...

    Broader source: Energy.gov (indexed) [DOE]

    Overcoming Common Pitfalls: Energy Efficient Lighting Projects Overcoming Common Pitfalls: Energy Efficient Lighting Projects Transcript Presentation More Documents & Publications...

  18. General Services Administration Photovoltaics Project in Sacramento...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    General Services Administration Photovoltaics Project in Sacramento, California General Services Administration Photovoltaics Project in Sacramento, California Document describes a...

  19. Leveraging Resources for Weatherization Innovation Pilot Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Weatherization Innovation Pilot Projects (WIPP) Presentation Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Presentation As a WIPP agency, reporting...

  20. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald...

  1. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports...

  2. Preparing for Project Implementation Assigning Accountability...

    Broader source: Energy.gov (indexed) [DOE]

    Assigning Accountability for Each Project (April 14, 2010) More Documents & Publications Preparing for Project Implementation after an Energy Assessment...

  3. U. S. Department of Energy project book

    SciTech Connect (OSTI)

    Not Available

    1980-01-01T23:59:59.000Z

    This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)

  4. Grid Connectivity Research, Development & Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connectivity Research, Development & Demonstration Projects Grid Connectivity Research, Development & Demonstration Projects 2013 DOE Hydrogen and Fuel Cells Program and Vehicle...

  5. Automotive Composites Consortium Focal Project 4: Automotive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Composites Consortium Focal Project 4: Automotive Components from Structural Composites Automotive Composites Consortium Focal Project 4: Automotive Components from Structural...

  6. SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project

    E-Print Network [OSTI]

    Huang, Haiying

    SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL#: ______________________________________ Anticipated Graduation Date: ______________________ Date Submitted: _________________________________ Mav: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative

  7. Agricultural capital project analysis system

    E-Print Network [OSTI]

    Lopez, Ramon Antonio

    1978-01-01T23:59:59.000Z

    Ecoromic Evaluation UNIDO Method Foreign Trade Distortion Distortion in the Factor Markets Discount Rate L&M Method Comparison with UNIDO Arguments in Favor Arguments Against the L&M Method Traditional Approach "Other"Approaches. . Risk... projects are development projects in developing coun- tries. They could be private or public. Examples of these are pro- duction and irrigation projects. Objectives The general objective of this research was to develop a co' mputer simulation package...

  8. CLEAR LAKE BASIN 2000 PROJECT

    SciTech Connect (OSTI)

    LAKE COUNTY SANITATION DISTRICT

    2003-03-31T23:59:59.000Z

    The following is a final report for the Clear Lake Basin 2000 project. All of the major project construction work was complete and this phase generally included final details and testing. Most of the work was electrical. Erosion control activities were underway to prepare for the rainy season. System testing including pump stations, electrical and computer control systems was conducted. Most of the project focus from November onward was completing punch list items.

  9. Pecos River Ecosystem Monitoring Project

    E-Print Network [OSTI]

    McDonald, A.; Hart, C.

    2004-01-01T23:59:59.000Z

    TR- 272 2004 Pecos River Ecosystem Monitoring Project C. Hart A. McDonald Texas Water Resources Institute Texas A&M University - 146 - 2003 Pecos River Ecosystem Monitoring Project... Charles R. Hart, Extension Range Specialist, Fort Stockton Alyson McDonald, Extension Assistant – Hydrology, Fort Stockton SUMMARY The Pecos River Ecosystem Project is attempting to minimize the negative impacts of saltcedar on the river ecosystem...

  10. Silver Peak Innovative Exploration Project

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

  11. Mn/DOT's Project Peer Review

    E-Print Network [OSTI]

    Minnesota, University of

    and sustain this culture #12;Project Management #12;Recent National Work in Transportation Project ManagementMn/DOT's Project Management Peer Review Creating a Project Management Culture 2010 CTS Research a Peer Review? Why Project Management? ·Improve project delivery performance ­ on time, on budget (an

  12. Projection screen having reduced ambient light scattering

    DOE Patents [OSTI]

    Sweatt, William C. (Albuquerque, NM)

    2010-05-11T23:59:59.000Z

    An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.

  13. Implementing Fast Hierarchical Back Projection Jason Chang

    E-Print Network [OSTI]

    Willsky, Alan S.

    Implementing Fast Hierarchical Back Projection Jason Chang ECE 558 ­ Final Project Paper May 9, 2007 #12;Implementing Fast Hierarchical Back Projection Chang ii Abstract ­ Filtered back projection implemented in this project, called fast hierarchical back projection (FHBP), was proposed in [1] as a fast

  14. RidgenoseSolarInterconnectionProject

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ridgenose Solar Interconnection Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), is preparing an environmental assessment (EA)...

  15. SPPR Project Customer Comments Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DSW. The transfer capability provided by the project would allow delivery from a new solar generation facility to the Palo Verde Hub. Previous Meetings' Comments: Comments...

  16. Texas 4-H Beef Project

    E-Print Network [OSTI]

    Texas 4-H Beef Project Team

    2000-07-27T23:59:59.000Z

    This tri-fold brochure explains the opportunities in 4-H beef projects, the membership requirements, potential costs, goals and objectives, volunteer leader opportunities, and career development possibilities....

  17. Nuclear Power Plant Design Project

    E-Print Network [OSTI]

    Nuclear Power Plant Design Project A Response to the Environmental and Economic Challenge Of Global.............................................................................................................. 4 3. Assessment of the Issues and Needs for a New Plant

  18. Economic Development Project Districts (Indiana)

    Broader source: Energy.gov [DOE]

    Redevelopment commissions may petition legislative bodies to designate economic development project districts in cities with populations between 80,500 and 500,000. Such districts may be...

  19. BPA Transmission Commercial Project Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commercial Project Roadmap 15-Minute Scheduling Dynamic Transfer Program NT Redispatch WECC-Bal- 002 ST Comp & Preemption ST ATC Method. PCM Monthlyweekly Implementation PCM...

  20. ED 5 - Palo Verde Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ED 5 - Palo Verde Project June 22rd Customer Meeting Presentation November 19th Proposal Decision Notification Letter Assumptions Summary of Comments October 6th Customer Meeting...

  1. Energy Research Project, Review (Minnesota)

    Broader source: Energy.gov [DOE]

    The commissioner shall continuously identify, monitor, and evaluate research studies and demonstration projects pertaining to alternative energy and energy conservation systems and methodologies,...

  2. DOE IDIQ ESPC Awarded Projects

    Broader source: Energy.gov [DOE]

    Excel spreadsheet summarizes the U.S. Department of Energy's (DOE) indefinite delivery, indefinite quantity (IDIQ) energy savings performance contract (ESPC) awarded projects.

  3. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30T23:59:59.000Z

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  4. NAWS-China Lake Project

    Broader source: Energy.gov [DOE]

    Presentation covers the NAWS-China Lake Project at the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  5. Project Management Plan Project Title: Natural Resources Management

    E-Print Network [OSTI]

    US Army Corps of Engineers

    DEFINITION. The NRM Gateway is a knowledge management resource, designed to serve the needs of the NRMP; · Preserve institutional knowledge; · Develop practical and agency-approved webpages that provide usefulProject Management Plan Project Title: Natural Resources Management (NRM) Gateway Website

  6. Project Management and Analysis Project Conception and Execution

    E-Print Network [OSTI]

    Sohoni, Milind

    of asset value pay-as-you-earn, progressive Octroi, Sales Tax pay-as-you- consume, regressive 10-15 wards of asset value pay-as-you-earn, progressive Octroi, Sales Tax pay-as-you- consume, regressive 10-15 wardsTD 608 Project Management and Analysis Part I Project Conception and Execution Milind Sohoni

  7. FY09 LDRD Projects 2009 Projects Page 1

    E-Print Network [OSTI]

    Ohta, Shigemi

    07-030 Structure of Mass-Size Selected Nanoparticles by Scanning Transmission Electron Microscopy Projects Page 2 LDRD Proj. No. Project Title P.I. Dept./Bldg. 07-054 Miniaturized RF Coil Arrays for Micro Panessa-Warren, B. ES&T/475C 07-073 Development of Room-temperature CdMnTe Gamma- ray Detectors Cui, Y

  8. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  9. LATEST PROJECTS & Preview a few of our latest research projects

    E-Print Network [OSTI]

    California at Davis, University of

    and development, disseminate informa- tion, and facilitate programs that reduce cooling system electrical demandLATEST PROJECTS & UPDATES Preview a few of our latest research projects & updates pg. 8 ENERGY?: pg. 5 #12;WESTERN COOLING CONNECTION2 Beutler Carrier Coolerado Davis Energy Group Integrated Comfort

  10. LATEST PROJECTS & Preview a few of our latest research projects

    E-Print Network [OSTI]

    California at Davis, University of

    , and facilitate programs that reduce cooling system electrical demand and energy consumption in the Western United usage in evaporative cooling systems · Aerosol Building Envelopes: we successfully sealed over 50LATEST PROJECTS & UPDATES Preview a few of our latest research projects & updates pg. 7 WCEC

  11. Overview of project

    E-Print Network [OSTI]

    unknown authors

    The Beefing Up the Palouse (BUP) pilot project is exploring strategies for converting land coming out of the Conservation Reserve Program (CRP) to a holistically managed forage resource using planned cattle grazing as the principle tool to move towards sustainability. Sustainability is defined as those practices that are economically viable, environmentally sound and socially responsible. As of 2007, the state of Washington had 1,557,212 acres enrolled in the CRP. The site of this project is located on G & L Farms in Adams County near Benge, Washington. This 6,000-acre farm includes 5,000 acres that are currently enrolled in the CRP. Adams County has one of the largest CRP enrollments nationwide, at over 214,000 acres, and a significant portion of this acreage is nearing the contract end in the next two years (2010-2011). USDA efforts to scale back total enrolled CRP acreage while focusing new offers on smaller contracts through Environmental Priority practices, as required by the 2008 Farm Bill, will likely lead to a significantly reduced CRP presence in Adams County and throughout central Washington as early as 2010. What is going to happen to the 39 million acres of land currently enrolled in the CRP in the U.S., including the 1.5 million acres in the state of Washington when the contracts expire? Sustainable alternatives to prevent these lands from returning to conventional tillage programs (e.g., winter wheat/fallow in Adams County) need to be characterized and replicated. To be viable these alternatives should be able to produce revenue equal to, or greater than the CRP contract payments (i.e., $50-55 per acre) while concurrently enhancing ecosystem processes and services. Due to contract restrictions and payment reductions, no land enrolled in the CRP program was grazed in this study. Land adjacent to lands in the CRP with similar topography and soil type and planted to grass/legume pasture was used to duplicate the effects of grazing and recovery periods. Some CRP land was used to test different fertilizer effects and alfalfa inter-seeding techniques. The 1,000-acres of non-CRP land (500 acres of which are in grass/legume pasture) plus another 300+ acres of land in the CRP were Certified

  12. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01T23:59:59.000Z

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  13. Solar Thermal Demonstration Project

    SciTech Connect (OSTI)

    Biesinger, K.; Cuppett, D.; Dyer, D.

    2012-01-30T23:59:59.000Z

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with â??Kalwallâ?? building panels. An added feature of the â??Kalwallâ?ť system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  14. Final Project Report

    SciTech Connect (OSTI)

    Zhang, Jin [University of California Santa Cruz; Zhao, Yiping [University of Georgia at Athens

    2014-12-05T23:59:59.000Z

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  15. Coastal Ohio Wind Project

    SciTech Connect (OSTI)

    Gorsevski, Peter; Afjeh, Abdollah; Jamali, Mohsin; Bingman, Verner

    2014-04-04T23:59:59.000Z

    The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directi

  16. LIMB Demonstration Project Extension

    SciTech Connect (OSTI)

    Not Available

    1991-09-15T23:59:59.000Z

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (1) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems; (2) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit; and (3) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater. The demonstration project consists of several distinct phases: a preliminary phase to develop the LIMB process design applicable to the host boiler, a construction and start-up phase, and an operating and evaluation phase. The first major activity, the development of the Edgewater LIMB design, was completed in January 1986 and detailed engineering is now complete. Major boiler-related components were installed during a September 1986 boiler outage. Start-up activities began in March of 1987 with tuning of the low NO{sub x} burners. Sorbent injection activities were underway as of July 1987. 3 figs.

  17. Suncatcher monitoring project

    SciTech Connect (OSTI)

    Maeda, B.

    1980-01-01T23:59:59.000Z

    An intensive microcomputer-based energy monitoring project was conducted on a passively heated and cooled residence in Davis, California. The building performance was estimated in the design phase by both a simplified method and an hourly simulation. In the monitoring phase, more than 75 sensors, located in the building elements, interior spaces, appliances, and the ambient environment provide data about temperatures, energy use and radiation. These data are used to determine the actual solar system contributions, and to validate and improve design calculation tools. Information was gathered on the Suncatcher system for almost three years. Daily min/max temperatures inside and outside of the house and utility use have been reduced and analyzed. From these data we calculate the monthly net heating load and the percentage of that met by solar energy. To date, it has averaged 71%. Hourly data, gathered by the custom-made data acquisition system, show how daily temperature and radiation patterns change. Natural cooling supplied 100% of the cooling need. During the hot summers typical of the Davis area, the house has remained very comfortable virtually all of the time, except for two or three afternoons each summer, where temperatures reached a stuffy 83 or 84F. The other solar energy source, the solar hot water system, has provided 50 to 60% of the hot water needed by the residents, who use less domestic hot water than average.

  18. Special Report Post-project

    E-Print Network [OSTI]

    Rudowsky, Ira

    128 Special Report Post-project appraisals pay Frank R. Gulliver li your company is like most, you- nal auditor with the British Petroleum Company He was a founding member of its post-project appraisal. The Rotterdam proj- ect's success taught top managers at BP a valuable lesson: the planners needed to improve

  19. Albeni Falls Wildlife Mitigation Project

    E-Print Network [OSTI]

    from the Albeni Falls Hydroelectric Project #12;Biological Objective 1 Protect 900 acres of wetland hydroelectric project. · 1988 publication of the Final Report Albeni Falls Wildlife Protection, Mitigation effects on wildlife resulting from hydroelectric development. 2. Select target wildlife species

  20. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems First level, 15.0 HEC Stockholm, Sweden A B D E L A H M I D into many devices. The goal of this thesis project is to build upon this trend toward "The internet vara enkel och billig. Den kommer att trådlöst eller via USB skicka vikter till en mottagare som sedan

  1. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden Z H A N G Y UA N H locations to which you must communicate with to access the object). In this thesis project a publish / prenumerera nätverk och sedan används i utformningen, genomförandet, och utvärdering av en publicera

  2. Degree project in Communication Systems

    E-Print Network [OSTI]

    Maguire Jr., Gerald Q.

    Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden N A R AYA N A N. The objective of the project is to evaluate and analyse the need for value added services in India. The report. Effekterna frĂĄn innehĂĄllsutvecklare och mjukvaruutvecklingen inom VAS diskuteras ocksĂĄ. Sedan kommer metoden

  3. Richmond Bay Campus: Project Update

    E-Print Network [OSTI]

    Lee, Jason R.

    Coordinate with City of Richmond South Shoreline Area planning #12;Richmond Bay Campus Vision A stateRichmond Bay Campus: Project Update Prepared for the Richmond City Council October 1, 2013 #12 and UCB · City of Richmond Updates · Summary · Questions & Answers #12;LBNL Project Update #12;University

  4. TSSWCB Bacteria-Related Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of TMDL projects for water bodies where swimming or wading may be unsafe or harvesting of oysters is limited or prohibited due to high concentrations of bacteria. ? Atascosa River: A TMDL Project for Bacteria ? Buffalo andWhite Oak Bayous: A TMDL...

  5. Multimedia Project Studio Service Model

    E-Print Network [OSTI]

    McShea, Daniel W.

    Multimedia Project Studio Service Model Over the course of the summer of 2010, we took a fresh look at the MPS Service Model. The goal was to ensure the MPS is meeting campus needs in the multimedia support to engage the campus community effectively in an ongoing fashion. #12;Multimedia Project Studio - Service

  6. The Climate Impacts LINK Project

    E-Print Network [OSTI]

    Feigon, Brooke

    The Climate Impacts LINK Project The Climatic Research Unit, University of East Anglia Funded by the UK Department of the Environment, Transport and the Regions, Contract Ref EPG 1/1/68 The Climate Impacts LINK Project: Applying Results from the Hadley Centre's Climate Change Experiments for Climate

  7. PROPOSAL FOR BIOCOMPLEXITY EDUCATION PROJECT

    E-Print Network [OSTI]

    at http://biocomplexity.cnr.colostate.edu/project_desc.htm. Approach: The Project plans to partner with the Big Thompson Watershed Forum (BTWF) and the US Geological Survey (USGS) to create comparative to develop curriculum and facilitate cross- cultural teaching strategies for natural resource management

  8. Developments in Digital Cinema Projection

    E-Print Network [OSTI]

    Zanibbi, Richard

    Developments in Digital Cinema Projection Barry Silverstein Projection Technology Manager Entertainment Imaging, Eastman Kodak 4pm, Wed., Nov. 1, 2006 Auditorium of the Center for Imaging Science George and color, the switch to Digital Technology. The Digital Cinema conversion process is just beginning. It has

  9. Project Management Plan Solution Stabilization

    SciTech Connect (OSTI)

    SATO, P.K.

    1999-08-31T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25T23:59:59.000Z

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  11. The Lake Charles CCS Project

    SciTech Connect (OSTI)

    Doug Cathro

    2010-06-30T23:59:59.000Z

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

  12. Detroit Commuter Hydrogen Project

    SciTech Connect (OSTI)

    Brooks, Jerry; Prebo, Brendan

    2010-07-31T23:59:59.000Z

    This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

  13. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01T23:59:59.000Z

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

  14. Project Project HQ City HQ State ARRA Funding Total Value Additional

    Open Energy Info (EERE)

    Inc Smart Grid Project Entergy Services Inc Smart Grid Project New Orleans Louisiana ISO New England Incorporated Smart Grid Project ISO New England Incorporated Smart Grid...

  15. PXIE: Project X Injector Experiment

    SciTech Connect (OSTI)

    Ostroumov, P.N.; /Argonne; Holmes, S.D.; Kephart, R.D.; Kerby, J.S.; Lebedev, V.A.; Mishra, C.S.; Nagaitsev, S.; Shemyakin, A.V.; Solyak, N.; Stanek, R.P.; /Fermilab; Li, D.; /LBL, Berkeley

    2012-05-01T23:59:59.000Z

    A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are planning a program of research and development aimed at integrated systems testing of critical components comprising the front end of the Project X. This program is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. Integrated systems testing, known as the Project X Injector Experiment (PXIE), will be accomplished with a new test facility under construction at Fermilab and will be completed over the period FY12-16. PXIE will include an H{sup -} ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

  16. Material Stabilization Project Management Plan

    SciTech Connect (OSTI)

    SPEER, D.R.

    1999-09-01T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  17. Project Functions and Activities Definitions for Total Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exactly is included in total estimated cost (TEC) and total project cost (TPC). g4301-1chp6.pdf -- PDF Document, 46 KB Writer: John Makepeace Subjects: Administration Management...

  18. Project Functions and Activities Definitions for Total Project Cost

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

  19. Glove Mouse Project The goal of this project

    E-Print Network [OSTI]

    de Lijser, Peter

    premise for the house is to care for the pet when the owner is unavailable or away. "Smart"Home Project Quality and Ventilation System The system automatically detects and ventilates out hazardous indoor c

  20. Computer-Based Energy Projects: Science Projects in Renewable...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Projects (Four Activities) Grades: 5-8, 9-12 Topic: Energy Basics Owner: National Renewable Energy Laboratory This educational material is brought to you by the U.S....

  1. PROJECT BOEING SGS

    SciTech Connect (OSTI)

    Bell, Thomas

    2014-12-31T23:59:59.000Z

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include: • Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection • Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event • Improved malware detection and zero-day threat response capability • Improved ability to systematically evaluate and secure in house and vendor sourced software applications • Improved ability to continuously monitor and maintain secure configuration of network devices resulting in reduced vulnerabilities for potential exploitation • Improved overall cyber security situational awareness through the integration of multiple discrete security technologies into a single cyber security reporting console • Improved ability to maintain the resiliency of critical systems in the face of a targeted cyber attack of other significant event • Improved ability to model complex networks for penetration testing and advanced training of cyber security personnel

  2. Clean Fuel Advanced Technology Awarded Projects Organization Project Descriptions

    E-Print Network [OSTI]

    Clean Fuel Advanced Technology Awarded Projects Organization Project Descriptions amount awarded - Miranda station Biodiesel (B100/B85) Pump1,3 $9,847 $13,633 $23,480 -141 152 916 92 Friends of Great Smoky Mountains National Park Biodiesel (B50) Tanks1,3 $33,681 $13,204 $46,885 -16 18 110 11 Duke Energy 2 Hybrid

  3. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Finch, S.M.; McMakin, A.H. (comps.)

    1992-06-01T23:59:59.000Z

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

  4. Advanced fusion concepts: project summaries

    SciTech Connect (OSTI)

    None

    1980-12-01T23:59:59.000Z

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications. Information is given for each of the following programs: (1) reverse-field pinch, (2) compact toroid, (3) alternate fuel/multipoles, (4) stellarator/torsatron, (5) linear magnetic fusion, (6) liners, and (7) Tormac. (MOW)

  5. UMTRA Project value engineering plan

    SciTech Connect (OSTI)

    Not Available

    1990-06-01T23:59:59.000Z

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments.

  6. Entomology 489 Field Entomology Field Project Guide

    E-Print Network [OSTI]

    Behmer, Spencer T.

    with information, people, materials). Field Projects (your project should...) FEntomology 489 ­ Field Entomology Field Project Guide A small-group field project is required for ENTO 489 ­ Field Entomology. This guide provides general information about the field-project

  7. Public participation in UMTRA Project program management

    SciTech Connect (OSTI)

    Majors, M.J.; Ulland, L.M. [Weston (Roy F.), Inc., Albuquerque, NM (United States)

    1993-12-31T23:59:59.000Z

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it`s been shown that an effective public participation program is an essential element to successful project implementation.

  8. REVIEW OF THE NEGOTIATION OF THE MODEL PROTOCOL ADDITIONAL TO THE AGREEMENT(S) BETWEEN STATE(S) AND THE INTERNATIONAL ATOMIC ENERGY AGENCY FOR THE APPLICATION OF SAFEGUARDS, INFCIRC/540 (Corrected) VOLUME II/III IAEA COMMITTEE 24, Major Issues Underlying the Model Additional Protocol (1996-1997).

    SciTech Connect (OSTI)

    Rosenthal, M.D.; Saum-Manning, L.; Houck, F.

    2010-01-01T23:59:59.000Z

    Volume I of this Review traces the origins of the Model Additional Protocol. It covers the period from 1991, when events in Iraq triggered an intensive review of the safeguards system, until 1996, when the IAEA Board of Governors established Committee 24 to negotiate a new protocol to safeguards agreement. The period from 1991-1996 set the stage for this negotiation and shaped its outcome in important ways. During this 5-year period, many proposals for strengthening safeguards were suggested and reviewed. Some proposals were dropped, for example, the suggestion by the IAEA Secretariat to verify certain imports, and others were refined. A rough consensus was established about the directions in which the international community wanted to go, and this was reflected in the draft of an additional protocol that was submitted to the IAEA Board of Governors on May 6, 1996 in document GOV/2863, Strengthening the Effectiveness and Improving the Efficiency of the Safeguards System - Proposals For Implementation Under Complementary Legal Authority, A Report by the Director General. This document ended with a recommendation that, 'the Board, through an appropriate mechanism, finalize the required legal instrument taking as a basis the draft protocol proposed by the Secretariat and the explanation of the measures contained in this document.'

  9. Energy Generation Project Permitting (Vermont)

    Broader source: Energy.gov [DOE]

    The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered...

  10. Portsmouth Paducah Project Office People

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PPPO People Photo Gallery To view a larger photo, click on the thumbnail photo. Photo will open in a new browser window. PortsmouthPaducah Project Office 1017 Majestic Drive,...

  11. Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03T23:59:59.000Z

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Admin Chg 1, dated 10-12-11, cancels DOE G 413.3-19.

  12. PUREX transition project case study

    SciTech Connect (OSTI)

    Jasen, W.G.

    1996-04-15T23:59:59.000Z

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation`s production of weapons-grade plutonium. The PUREX/UO{sub 2} Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within.

  13. Renewable Energy Project Bond Program

    Broader source: Energy.gov [DOE]

    Legislation enacted in Idaho in April 2005 ([http://legislature.idaho.gov/legislation/2005/S1192.html Senate Bill 1192]) allows independent (non-utility) developers of renewable energy projects in...

  14. AWEA Wind Project Siting Seminar

    Office of Energy Efficiency and Renewable Energy (EERE)

    The AWEA Wind Project Siting Seminar takes an in-depth look at the latest siting challenges and identify opportunities to reduce risks associated with the siting and operation of wind farms to...

  15. Portsmouth/Paducah Project Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aug. 23, 2013 Robert.Smith@lex.doe.gov DOE Paducah Site Demolition Debris Shipped to Utah for Disposition Twenty-eight rail cars filled with debris from a major demolition project...

  16. Portsmouth/Paducah Project Office,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 1, 2012 Robert.Smith@lex.doe.gov DOE Workshop Gauges Paducah Plant Interest PADUCAH, KY - The U.S. Department of Energy's PortsmouthPaducah Project Office (PPPO) is...

  17. Portsmouth/Paducah Project Office,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 22, 2012 Robert.Smith@lex.doe.gov DOE Plans Workshop to Assess Paducah Plant Interest PADUCAH, KY. - The U.S. Department of Energy's (DOE) PortsmouthPaducah Project Office is...

  18. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect (OSTI)

    Treis, Tania

    2012-04-30T23:59:59.000Z

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: � Drilling, testing, and completion of a new production well and geothermal water injection well � Construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  19. Prism : an answer projection system

    E-Print Network [OSTI]

    Wu, Lynn, 1981-

    2003-01-01T23:59:59.000Z

    Prism is an answer projection system that combines the best attributes of traditional and Web-based question answering systems. Traditional question answering systems retrieve answers with pinpoint accuracy but limited ...

  20. 2015 Project Peer Review Agenda

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office (BETO) is hosting the 2015 Project Peer Review on March 23–27, 2015, at the Hilton Mark Center, in Alexandria, Virginia. Agendas for the individual technology areas can be found below.

  1. Financing Co-generation Projects

    E-Print Network [OSTI]

    Young, R.

    1982-01-01T23:59:59.000Z

    profit generated by energy intensive industries will not be sufficient to provide the capital required for both normal business expansion and energy conservation projects. Debt financing for energy saving equipment will adversely impact balance sheet...

  2. Municipal Support of Projects (Iowa)

    Broader source: Energy.gov [DOE]

    Municipalities may choose to support projects, such as those which will generate electricity through the use of a renewable energy source, by tax-exempt bond financing; easements for roads, water...

  3. Southern Region Watershed Management Project

    E-Print Network [OSTI]

    Coordinators and the organization, management and activities of the Southern Region Water Quality Planning1 Southern Region Watershed Management Project September 15, 2000 to September 14, 2005 Terminal responding to water quality and conservation issues with educational assistance, technology development

  4. Risk analysis for tunneling projects

    E-Print Network [OSTI]

    Sousa. Rita L

    2010-01-01T23:59:59.000Z

    Tunnel construction is increasing world wide. Although the majority of tunnel construction projects have been completed safely, there have been several incidents that have resulted in delays, cost overruns, and sometimes ...

  5. Enforcement Project Management Handbook. Directive

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    The handbook has been prepared as a basic reference and training manual to assist RPMs (Remedial Project Managers) and OSCs (On-Scene Coordinators) in planning, negotiating, and managing various enforcement actions.

  6. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  7. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Finch, S.M.; McMakin, A.H. (comps.)

    1991-01-01T23:59:59.000Z

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.

  8. CHP R&D Project Descriptions

    Broader source: Energy.gov [DOE]

    The CHP R&D project portfolio includes advanced reciprocating engine systems (ARES), packaged CHP systems, high-value applications, fuel-flexible CHP, and demonstrations of these technologies. Project fact sheets and short project descriptions are provided below:

  9. The Internet Publication Project Annual Report

    E-Print Network [OSTI]

    Shyy, Wei

    .......................................................................................................................................... 2 IV. 2005-06 PROJECT TEAMS...................................................................................................................................... 3 V. PROJECT DELIVERABLES 2005-06, achieved many of its project deliverables for the 2005-06 fiscal year as documented in this annual report

  10. California Energy Demand Scenario Projections to 2050

    E-Print Network [OSTI]

    McCarthy, Ryan; Yang, Christopher; Ogden, Joan M.

    2008-01-01T23:59:59.000Z

    energy consumption is projected through 2050 using the linear trendtrends that lead to greater or lesser energy consumption,energy consumption is projected through 2050 based on projected near-term trends

  11. Advanced engineering environment collaboration project.

    SciTech Connect (OSTI)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01T23:59:59.000Z

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  12. Integrated Project Management System description

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    The Integrated Program Management System (IPMS) Description is a ``working`` document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ``why`` and ``what is expected`` is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately.

  13. Searchlight Wind Energy Project DEIS Appendix A

    Broader source: Energy.gov (indexed) [DOE]

    Searchlight Wind Energy Project DEIS Appendix A Page | A Appendix A: Public Scoping Report SCOPING SUMMARY REPORT SEARCHLIGHT WIND ENERGY PROJECT ENVIRONMENTAL IMPACT STATEMENT...

  14. Industrial Energy Efficiency Projects Improve Competitiveness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Projects Improve Competitiveness and Protect Jobs Industrial Energy Efficiency Projects Improve Competitiveness and Protect Jobs U.S. Department of Energy (DOE)...

  15. Technology Transfer for Brownfields Redevelopment Project | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Technology Transfer for Brownfields Redevelopment Project Technology Transfer for Brownfields Redevelopment Project The U.S. Department of Energy has provided six computers to...

  16. Combustion & Fuels Waste Heat Recovery & Utilization Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combustion & Fuels Waste Heat Recovery & Utilization Project Project Technical Lead - Thermoelectric Analysis & Materials 27 February 2008 2008 DOE OVT Annual Merit Review 2008...

  17. Collbran Project Power Sales Rate History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy only. Beginning October 1, 1987, all Collbran Project power became a Salt Lake City Area Integrated Projects resource. As of that date, direct sales to power customers...

  18. Project Management Plan Resident Management System (RMS)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

  19. Renewable Energy Project Development and Financing: Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    Most costly for Tribedeveloper to acquire long-term ownership of project (large cash infusion year 7) * Tribedeveloper operates the project * Requires largest equity...

  20. ESPC Project Performance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC Project Performance ESPC Project Performance The U.S. Department of Energy's (DOE) Oak Ridge National Laboratory performs annual assessments of the realization rate of energy...

  1. ESPC ENABLE Project Assistance and Training

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) offers project assistance and training to help Federal agencies implement Energy Savings Performance Contracts (ESPC) ENABLE projects.

  2. Los Alamos Dynamics Summer School Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    School-Overview Los Alamos Dynamics Summer School Projects Los Alamos Dynamics Summer School Projects and Resources Contact Institute Director Charles Farrar (505) 663-5330 Email...

  3. Project Directories File System at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    responsiblity to protect from data loss. Access Control There must be a project directory administrator associated with each project directory. This user must have a NIM role of...

  4. Collaboration Shines in Materials Project Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Collaboration Shines in Materials Project Success Collaboration Shines in Materials Project Success Many Hands at Lab Lift 'World-Changing Idea' to New Heights December 12, 2013 |...

  5. Comprehensive Energy Projects (CEP) and Innovative Financing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comprehensive Energy Projects (CEP) and Innovative Financing Comprehensive Energy Projects (CEP) and Innovative Financing Presented at the Technology Transition Corporation and...

  6. Synchrophasor Engineering Education Program Project Summaries...

    Broader source: Energy.gov (indexed) [DOE]

    Synchrophasor Engineering Education Program Project Summaries Available Synchrophasor Engineering Education Program Project Summaries Available July 9, 2014 - 10:48am Addthis On...

  7. Renewable Energy Project Development: Advanced Process Topics

    Broader source: Energy.gov (indexed) [DOE]

    About the DOE Office of Indian Energy Education Initiative Processes for Developing Renewable Energy Projects on Tribal Lands - Understanding the Energy Market and Project...

  8. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

  9. Renewable Energy Project Planning and Implementation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Implementation Renewable Energy Project Planning and Implementation Federal renewable energy projects can be large or small and managed by a third-party or the agency....

  10. Renewable Energy Project Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Project Overview Renewable Energy Project Overview Presentation-given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting-covers federal...

  11. Renewable Energy Project Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Renewable Energy Project Assistance The Federal Energy Management Program (FEMP) provides renewable energy project assistance to help Federal agencies identify and...

  12. Tribal Renewable Energy Advanced Course: Project Development...

    Broader source: Energy.gov (indexed) [DOE]

    slides. This course provides in-depth information on project development processes for renewable energy projects on tribal lands, including: Understanding the energy market and...

  13. Financing Mechanisms for Renewable Energy Projects | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Mechanisms for Renewable Energy Projects Financing Mechanisms for Renewable Energy Projects On December 5, 2013, the White House released Federal Leadership on Energy...

  14. Special Science Call Projects Announced | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Special Science Call Projects Announced Special Science Call Projects Announced Released: April 22, 2015 23 high-impact research proposals accepted EMSL Scientist Zihua Zhu...

  15. project examples | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cycle (IGCC) concept at a commercial scale, the Cool Water Project, part of DOE's Clean Coal Technology (CCT) Program. The Cool Water Project was conducted in Southern...

  16. Manhattan Project Historical Resources | Department of Energy

    Energy Savers [EERE]

    the best detailed published accounts of the Manhattan Project.and are available at major libraries. In July 2013, the Department launched The Manhattan Project: Resources, a...

  17. Project Transition/Closeout (CD-4)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24T23:59:59.000Z

    This Guide is written for the federal project director ensuring that processes progress smoothly and that projects meet asset management goals and financial closure requirements of DOE.

  18. Technical Standards, Program Project Justification Statement...

    Energy Savers [EERE]

    Standards, Program Project Justification Statement - August 29, 2012 August 29, 2012 DOE Technical Standards Program Project Justification Statement As part of the new...

  19. Three Offshore Wind Advanced Technology Demonstration Projects...

    Office of Environmental Management (EM)

    Offshore Wind Advanced Technology Demonstration Projects Receive Phase 2 Funding Three Offshore Wind Advanced Technology Demonstration Projects Receive Phase 2 Funding September...

  20. SunZia Southwest Transmission Project Comments

    Energy Savers [EERE]

    or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and...

  1. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-01-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  2. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-11-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  3. Post Project Analysis of a Restored Reach of Redwood Creek

    E-Print Network [OSTI]

    Docto, Mia; Corvillon, Daniela Pena

    2012-01-01T23:59:59.000Z

    benchmark  for  stream  restoration  projects  (Dunne  &  the  stream  inventory  two  restoration  projects  have  production  stream.  Two  restoration  projects  have  

  4. Photovoltaic concentrator technology development project. Sixth project integration meeting

    SciTech Connect (OSTI)

    None

    1980-10-01T23:59:59.000Z

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  5. MHK Projects/Ashley Point Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07)AK ProjectMS Project State/Province

  6. MHK Projects/Atchafalaya River Hydrokinetic Project II | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07)AK ProjectMS Project

  7. MHK Projects/Avondale Bend Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07)AK ProjectMS ProjectJersey

  8. MHK Projects/Belair Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07)AK ProjectMSBelair Project < MHK

  9. MHK Projects/Duncan Point Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformationCygnet < MHK Projects JumpDeltaStreamLA Project

  10. application project planning: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to carry out the project 18 Sustainability Project Fund Application Form Requirements Project Title Engineering Websites Summary: Sustainability Project Fund Application Form...

  11. 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I:...

  12. 2015 DOE Acquisition and Project Management (APM) Workshop Presentatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Project Assessments, Science SC Projects Perspective 1300 Scott Cannon, MOX Federal Project Director Mixed Oxide (MOX) Fuel Fabrication Facility Project Lessons...

  13. RP-5 RENEWABLE ENERGY PROJECT

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2003-01-30T23:59:59.000Z

    This is the second quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of October 1, 2002 to December 31, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted in order to follow up on potential renewable energy technologies that were identified in the previous report; the technologies were analyzed for their feasibility, suitability and cost effectiveness for this project. This report covers the one-day conceptual design kickoff meeting that took place on November 4, 2002. The meeting was held to discuss the practicality and implementation of potential innovative technologies. Following the kickoff meeting, Inland Empire Utilities Agency (IEUA) and CH2M Hill, the Public Interest Energy Research (PIER) Consultant, held a meeting on December 2, 2002 to discuss the Conceptual Design Report outline and contents in order to clearly present each selected technology along with its evaluation, cost effectiveness and justification. A conference call also took place between the PIER Consultant and IEUA on December 13, 2002, to discuss the overall scope of work for this project. Major project activities in this period include expanded discussions on previous Energy Charrette decisions and recommendations, conceptual design kickoff meeting, conceptual design report, and deciding on the overall project scope of work.

  14. Research Projects in Industrial Technology.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Industrial Technology Section.

    1990-06-01T23:59:59.000Z

    The purpose of this booklet is to briefly describe ongoing and completed projects being carried out by Bonneville Power Administration's (BPA) Industrial Technology Section. In the Pacific Northwest, the industrial sector is the largest of the four consuming sectors. It accounted for thirty-nine percent of the total firm demand in the region in 1987. It is not easy to asses the conservation potential in the industrial sector. Recognizing this, the Northwest Power Planning Council established an objective to gain information on the size, cost, and availability of the conservation resource in the industrial sector, as well as other sectors, in its 1986 Power Plan. Specifically, the Council recommended that BPA operate a research and development program in conjunction with industry to determine the potential costs and savings from efficiency improvements in industrial processes which apply to a wide array of industrial firms.'' The section, composed of multidisciplinary engineers, provides technical support to the Industrial Programs Branch by designing and carrying out research relating to energy conservation in the industrial sector. The projects contained in this booklet are arranged by sector --industrial, utility, and agricultural -- and, within each sector, chronologically from ongoing to completed, with those projects completed most recently falling first. For each project the following information is given: its objective approach, key findings, cost, and contact person. Completed projects also include the date of completion, a report title, and report number.

  15. Hualapai Wind Project Feasibility Report

    SciTech Connect (OSTI)

    Davidson, Kevin [Hualapai Tribe] [Hualapai Tribe; Randall, Mark [Daystar Consulting] [Daystar Consulting; Isham, Tom [Power Engineers] [Power Engineers; Horna, Marion J [MJH Power Consulting LLC] [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.] [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC] [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey] [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP] [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.] [First American Financial Advisors, Inc.

    2012-12-20T23:59:59.000Z

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  16. Project Execution Plan, Rev. 3

    SciTech Connect (OSTI)

    IT Corporation, Las Vegas

    2002-08-01T23:59:59.000Z

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

  17. Microphonics control for Project X

    SciTech Connect (OSTI)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01T23:59:59.000Z

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  18. Project X RFQ EM Design

    SciTech Connect (OSTI)

    Romanov, Gennady; /Fermilab; Hoff, Matthew; Li, Derun; Staples, John; Virostek, Steve; /LBNL

    2012-05-09T23:59:59.000Z

    Project X is a proposed multi-MW proton facility at Fermi National Accelerator Laboratory (FNAL). The Project X front-end would consist of an H- ion source, a low-energy beam transport (LEBT), a CW 162.5 MHz radio-frequency quadrupole (RFQ) accelerator, and a medium-energy beam transport (MEBT). Lawrence Berkeley National Laboratory (LBNL) and FNAL collaboration is currently developing the designs for various components in the Project X front end. This paper reports the detailed EM design of the CW 162.5 MHz RFQ that provides bunching of the 1-10 mA H- beam with acceleration from 30 keV to 2.1 MeV.

  19. Costilla County Biodiesel Pilot Project

    SciTech Connect (OSTI)

    Doon, Ben; Quintana, Dan

    2011-08-25T23:59:59.000Z

    The Costilla County Biodiesel Pilot Project has demonstrated the compatibility of biodiesel technology and economics on a local scale. The project has been committed to making homegrown biodiesel a viable form of community economic development. The project has benefited by reducing risks by building the facility gradually and avoiding large initial outlays of money for facilities and technologies. A primary advantage of this type of community-scale biodiesel production is that it allows for a relatively independent, local solution to fuel production. Successfully using locally sourced feedstocks and putting the fuel into local use emphasizes the feasibility of different business models under the biodiesel tent and that there is more than just a one size fits all template for successful biodiesel production.

  20. RP-5 RENEWABLE ENERGY PROJECT

    SciTech Connect (OSTI)

    Neil Clifton, P.E.; Eliza Jane Whitman; Jamal A. Zughbi, P.E.

    2002-10-30T23:59:59.000Z

    This report is the first quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of July 12, 2002 (project inception) to September 30, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted to identify and analyze potential renewable energy technologies and verify its feasibility and suitability for the project. The report covers the two-day Energy Charrette that was held at the Inland Empire Utilities Agency (IEUA) Headquarters Building on May 8-9, 2002 to brainstorm, evaluate and present all available renewable energy options along with their implementations. Although the Energy Charrette was held prior to awarding of the DOE Grant, the outcome of the Charrette forms the basis of the activities that took place after July 12, 2002. Therefore, the Energy Charrette is frequently referenced and discussed in this report. The report also discusses the Energy Meeting that took place on September 24, 2002 between IEUA and CH2M Hill to follow up on the various presentations and recommendations resulting from the Energy Charrette. It should be noted that no final equipment data or capacities have been presented in the report, as the Conceptual Design has not started yet. This report covers continuing effort and work to complete the Request for Proposal (RFP) for this project. The Executive Summary Section covers more details on the scope of work, which consists of the conceptual, preliminary and final design, and what has been accomplished during the report period. Tools and methods utilized in this project to identify renewable energy technologies are included in the ''Experimental'' Section. Finally, Project achievements, implications and importance in improving this kind of technology are summarized in the ''Conclusion'' Section.

  1. Forecasting potential project risks through leading indicators to project outcome

    E-Print Network [OSTI]

    Choi, Ji Won

    2007-09-17T23:59:59.000Z

    , the Construction Industry Institute (CII) formed a research team to develop a new tool that can forecast the potential risk of not meeting specific project outcomes based on assessing leading indicators. Thus, the leading indicators were identified and then the new...

  2. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    SciTech Connect (OSTI)

    J. T. Beck

    2007-04-26T23:59:59.000Z

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities.

  3. PROJECT INFORMATION Project Number: S61268-583

    E-Print Network [OSTI]

    Barthelat, Francois

    ANALYSIS Narrative summary Expected results Performance measurement Assumptions and level of risk Goal and decision-makers with tools for developing IWRM policies in three DC's (Grenada, Guyana, Jamaica) by Year 6, Grenada and Guyana are committed to achieving and sustaining project results. Level of Risk: Low 2

  4. FY10 WDI PROJECT FUNDING CUNY Unit Project Name

    E-Print Network [OSTI]

    Rosen, Jay

    Project for New Supervisors and Direct Care Professionals Greening Your Facility: Performing Energy Audits Curriculum and Technology for Digital Image and Video Processing CUIS Internship Energy Program Kingsborough School CLRN Incubator for Justice II and LaunchPad for Success Lehman College Collaborative Workforce

  5. Exploration and project management Sylvain Lenfle

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    to manage innovation. We argue that, in line with the work on project classification, a distinction should1 Exploration and project management Sylvain Lenfle University of Cergy-Pontoise Management of Project Management, Vol. 6, n°5, p. 469-478, July. Abstract Project management in academic studies tends

  6. The Google Library Project Hal R. Varian

    E-Print Network [OSTI]

    Varian, Hal R.

    . It is important to distinguish the copyright status of the various types of content in the Google Library ProjectThe Google Library Project Hal R. Varian January 2006 Revised: February 10, 2006 Abstract This is an economic analysis of the Google Library project. I describe the project and outline why it is consistent

  7. Project Development and Finance: Capabilities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-01-01T23:59:59.000Z

    Capabilities overview of NREL's Project Finance and Development Group within the Deployment and Market Transformation Directorate.

  8. National Bioenergy Center Biochemical Platform Integration Project

    SciTech Connect (OSTI)

    Not Available

    2008-07-01T23:59:59.000Z

    April through June 2008 update on activities of the National Bioenergy Center's Biochemical Platform Integration Project.

  9. Cross-Functional Project Teams Real Estate

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Rigg Assistant Director Project Controls Doug Hanna University Architect Design Mary Krasny Associate

  10. Cross-Functional Project Teams Real Estate

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Assistant Director Project Controls Doug Hanna University Architect University Architects Office Mary Krasny

  11. Final Year Projects Class of 2012

    E-Print Network [OSTI]

    Humphrys, Mark

    Engineering Page 10 Message from our Sponsor SAP Page 13 Project Areas/Technology Categories Page 15 Operating Systems/Programmes Page 16 Project Index Page 17-18 Projects 1-82 Page 20-101 Companies Sponsoring PrizesFinal Year Projects Class of 2012 schools of computing, electronic engineering and mechanical

  12. Interns for Indiana (IFI) Project descriptions

    E-Print Network [OSTI]

    with the company after graduation, which allows him to work on cutting edge projects, aid in company growthInterns for Indiana (IFI) Projects Project descriptions: · Software development, database design analysis Past student project Development of animated graphics for web portal and product demos -Kevin

  13. Guidelines for Home Energy Professionals Project Glossary

    Broader source: Energy.gov [DOE]

    This document contains key terms and definitions used in the Guidelines for Home Energy Professionals Project.

  14. DIGESTER GAS - FUEL CELL - PROJECT

    SciTech Connect (OSTI)

    Dr.-Eng. Dirk Adolph; Dipl.-Eng. Thomas Saure

    2002-03-01T23:59:59.000Z

    GEW has been operating the first fuel cell in Europe producing heat and electricity from digester gas in an environmentally friendly way. The first 9,000 hours in operation were successfully concluded in August 2001. The fuel cell powered by digester gas was one of the 25 registered ''Worldwide projects'' which NRW presented at the EXPO 2000. In addition to this, it is a key project of the NRW State Initiative on Future Energies. All of the activities planned for the first year of operation were successfully completed: installing and putting the plant into operation, the transition to permanent operation as well as extended monitoring till May 2001.

  15. Advanced engineering environment pilot project.

    SciTech Connect (OSTI)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

    2006-10-01T23:59:59.000Z

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  16. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01T23:59:59.000Z

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  17. DSO - the Danish DA project

    SciTech Connect (OSTI)

    Rahbek, T.; Jorgensen, H.J.; Jacobsen, E.; Nielsen, T.G.

    1994-12-31T23:59:59.000Z

    This paper describes a Danish distribution automation project. The objective of the project is to determine the utilities` needs five years from now and then to define the requirements these needs will put to the utilities equipment, methods and systems. The paper reports on the results we have achieved until now and will deal with these subjects: (1) Systems structure with a three layer information model; (2) Systems operation with three operational modes, i.e. normal mode, passive fault mode and active fault mode; (3) Four standard types of transformer stations including a standard layout for an advanced transformer station; and (4) A new compact, low cost, optical MV current sensor.

  18. The Carpenteria reservoir redevelopment project

    SciTech Connect (OSTI)

    Kendall, R.P.; Whitney, E.M.; Krogh, K.E. [Los Alamos National Lab., NM (United States); Coombs, S. [Pacific Operators Offshore, Inc., Carpinteria, CA (United States); Paul, R.G. [Dept. of the Interior (United States); Voskanian, M.M. [California State Lands Commission, Sacramento, CA (United States); Ershaghi, I. [University of Southern California, Los Angeles, CA (United States)

    1997-08-01T23:59:59.000Z

    This is the final report of a one-year, Laboratory Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The objective of this project was to develop a simulation-based reservoir management system that could be used to guide the redevelopment of the Carpenteria Offshore Field, which is located just seven miles from Santa Barbara. The system supports geostatistical and geological modeling and reservoir forecasting. Moreover, it is also a shared resource between the field operator, Pacific Operators Offshore, and the mineral owners, the U.S. Department of the Interior and the State of California.

  19. Manhattan Project | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you wantJoin us for #SpaceWeek Join usProject » ManhattanProject

  20. Project Management | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO Overview OCHCODepartment ofRecipientsand Project AnalysisID Project