ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Broader source: Energy.gov (indexed) [DOE]

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

2

Hydropower Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

3

Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean  

Broader source: Energy.gov (indexed) [DOE]

Los Alamos County Completes Abiquiu Hydropower Project, Bringing Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on the completion and startup today of the Abiquiu Hydropower Project in New Mexico - the first hydropower project funded by the American Recovery and Reinvestment Act to be completed nationwide. "Today marks a major milestone in securing America's clean energy future as we celebrate the completion of the Department of Energy's first major Recovery Act-funded water power project. By increasing renewable energy output at existing hydropower facilities, we can create clean energy jobs,

4

16 Projects To Advance Hydropower Technology | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

5

16 Projects To Advance Hydropower Technology | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Projects To Advance Hydropower Technology Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

6

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Broader source: Energy.gov [DOE]

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

7

Weatherization Pilot Projects  

Broader source: Energy.gov [DOE]

Webinars, fact sheets, and other information on Weatherization Assistance Program's Sustainable Energy Resources for Consumers and Weatherization Innovation Pilot Program projects.

8

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation  

Broader source: Energy.gov (indexed) [DOE]

933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation 933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA SUMMARY DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

9

Small Hydropower Research and Development Technology Project  

SciTech Connect (OSTI)

The objective of this work was to investigate, develop, and validate the next generation of small hydroturbine generator designs that maximize the energy transfer from flowing water to electrical power generation. What resulted from this effort was the design of a new technology hydroturbine that Near Space Systems (NSS) has named the Star*Stream Hydroturbine. Using a design that eliminates nearly all of the shortfalls of conventional hydroturbines, the Star*Stream Hydroturbine employs a new mechanical-to-electrical energy transfer hydro design that operates without lubrication of any kind, and does not introduce foreign chemicals or particulate matter from oil or drive shaft seal degradation into the hydro ecology. In its unique configuration, the Star*Stream Hydroturbine is nearly environmentally inert, without the negative aspects caused by interrupting the ecological continuity, i.e., disruptions to sedimentation, water quality, habitat changes, human displacement, fish migration, etc., - while it ensures dramatically reduced timeframes to project completion. While a remarkable reduction in LCOE resulting from application of the Star*Stream Hydroturbine technology has been the core achievement of the this effort, there have been numerous technological breakthroughs from the development effort.

Blackmore, Mo [Near Space Systems, Inc.] [Near Space Systems, Inc.

2013-12-06T23:59:59.000Z

10

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development  

Broader source: Energy.gov [DOE]

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

11

Feasibility of Hydrogen Production from Micro Hydropower Projects in Nepal  

E-Print Network [OSTI]

The current energy crisis in Nepal clearly indicates that the future energy-demand cannot be met by traditional energy-sources. Community-based micro-hydropower operations are considered to be one of the most feasible options for energy development. However, the power plant capacity factor remains very low due to limited commercial and business opportunities. Generation of hydrogen (H2) from the unutilized power could eradicate this problem. This new energy carrier is clean, can save foreign currency and increases the energy-security. The aim of this study is to determine the potential of H2 production from excess energy of a micro-hydro project in rural Nepal using HOMER from NREL.

M. S. Zaman; A. B. Chhetri; M. S. Tango

2010-01-01T23:59:59.000Z

12

16 R&D Projects Across 11 States to Advance Hydropower in U.S. | Department  

Broader source: Energy.gov (indexed) [DOE]

6 R&D Projects Across 11 States to Advance Hydropower in U.S. 6 R&D Projects Across 11 States to Advance Hydropower in U.S. 16 R&D Projects Across 11 States to Advance Hydropower in U.S. September 6, 2011 - 3:38pm Addthis Rajesh Dham Hydropower Technology Team Lead Today, Secretary Chu announced that the Energy Department is funding 16 projects that will make hydropower production even more efficient, cost-effective and environmentally friendly. These research projects will help advance hydropower technologies - providing clean power to Americans while creating jobs. Hydropower technologies capture water's potential energy via a turbine to generate electricity. It is the nation's largest, most reliable, and least expensive source of renewable power generation. Companies, universities, national laboratories, and local governments

13

Climate change impacts on financial risk in hydropower projects  

E-Print Network [OSTI]

the financial viability of existing and potential hydro schemes. Previous work developed a methodology for quantifying the potential impact of climate change on the economics of hydropower schemes. Here, the analysis is extended to examine the potential...

Harrison, Gareth P; Whittington, Bert; Wallace, Robin

14

The National Conversion Pilot Project  

SciTech Connect (OSTI)

The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process.

Roberts, A.V. [BNFL, Inc., Golden, CO (United States)

1995-12-31T23:59:59.000Z

15

National Hydropower Association conference proceedings  

SciTech Connect (OSTI)

These proceedings collect papers on hydroelectricity. Topics include legal developments in hydropower regulation, an overview of the small hydro industry, and financing hydropower projects.

Not Available

1985-01-01T23:59:59.000Z

16

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Texas Propane Vehicle Pilot Project Texas Propane Vehicle Pilot Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

17

Pumped Storage Hydropower (Project Development Support)Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development  

Broader source: Energy.gov [DOE]

Pumped Storage Hydropower (Project Development Support)Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development

18

Sustainability suspense of small hydropower projects: A study from western Himalayan region of India  

Science Journals Connector (OSTI)

Abstract Small hydropower projects (SHPs), though generally considered more environmentally benign and socially acceptable as compared to large projects, yet their overall sustainability is under suspicion in the Himalayan regions. Almost all \\{SHPs\\} in this region are being developed as run of the river mode which generally causes less/no submergence and quite less displacement of people as compared to large reservoir based hydropower production mode. However, in the absence of proper planning and monitoring mechanism, these projects are causing implacable tunnelling of hills, choking of streams, conversion of streams into dry ditches and long term socio-environmental impacts. This paper presents a SHP development study from hydro rich Beas river basin of Himachal Pradesh, a state nestled in western Himalayan region of India. In depth field studies, focus group discussions with the project affected people and interaction with project proponents of five \\{SHPs\\} in this region suggest that sustainability issues with respect to \\{SHPs\\} are not small vis-a-vis size of their installed capacity. There is an urgent need to take steps to include \\{SHPs\\} having an installed capacity of above 10MW into the ambit of environment clearance process which is absent in many countries of the world at present.

Deepak Kumar; S.S. Katoch

2015-01-01T23:59:59.000Z

19

2015 Forum on Hydropower  

Broader source: Energy.gov [DOE]

Discover how Canadian hydropower is learning lessons and building the future.Get updated on greenfield, rehabilitation, refurbishment and expansion projects going on across the country. Learn how...

20

Pilot Peak Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Pilot Peak Geothermal Project Pilot Peak Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Pilot Peak Geothermal Project Project Location Information Coordinates 38.342266666667°, -118.10361111111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.342266666667,"lon":-118.10361111111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

46th Street Pilot Street Lighting Project  

E-Print Network [OSTI]

46th Street Pilot Street Lighting Project A Joint Venture: Hennepin County & City of Minneapolis Street to 48th Street) as standard high-pressure sodium (HPS) lighting comparison corridor #12;The over time #12;Initial Lighting Comparison #12;Lighting Project Location #12;Street Light Layout 30

Minnesota, University of

22

MHK Projects/Portugal Pre Commercial Pilot Project | Open Energy  

Open Energy Info (EERE)

Portugal Pre Commercial Pilot Project Portugal Pre Commercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

23

H Foundation Pilot Project Awards  

E-Print Network [OSTI]

Center of Excellence (PCE) Release Date: June 5, 2013, PCE or rPPC) Through the generous support of the H Foundation, members of the Basic Sciences project awards will provide up to $5,000 directly to the Proteomics Center of Excellence (PCE

24

JGI - The GEBA Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GEBA Sequencing Plans GEBA Sequencing Plans For status information, see the Genome Projects section, or go to Microbial Genomics to find the latest releases. Organism Domain Phylum Status IMG-ER NCBI PID Culture ID GOLD ID Acidimicrobium ferrooxidans DSM 10331 Bacteria Actinobacteria draft DSM 10331 Gi02326 Actinosynnema mirum 101, DSM 43827 Bacteria Actinobacteria draft 2500395345 19705 DSM 43827 Gi02064 Alicyclobacillus acidocaldarius acidocaldarius 104-IA, DSM 446 Bacteria Firmicutes draft 29405 DSM 446 Gi02324 Anaerococcus prevotii PC 1, DSM 20548 Bacteria Firmicutes draft DSM 20548 Gi02318 Atopobium parvulum IPP 1246, DSM 20469 Bacteria Actinobacteria draft 29401 DSM 20469 Gi02317 Beutenbergia cavernosa HKI 0122, DSM 12333 Bacteria Actinobacteria draft 2500395322 20827 DSM 12333 Gi02225

25

Stakeholder Engagement and Outreach: Wind for Schools Pilot Project Results  

Wind Powering America (EERE)

Pilot Project Results Pilot Project Results In 2006, the Wind Powering America team based at the National Renewable Energy Laboratory (NREL) launched a pilot project in Colorado to develop the Wind for Schools project model. The pilot project identified the key elements of a successful Wind for Schools project. This page summarizes these elements. Although the Wind for Schools project ended on September 30, 2013, these lessons learned can be helpful for others planning school turbine installations. Identify a Champion A project cannot succeed without a local project champion, an individual, or group to keep the key players in the community informed, cooperating, and moving toward project goals. During the Colorado pilot project, the Wind Powering America team learned that the project development stages of

26

US/Brazil joint pilot project objectives  

SciTech Connect (OSTI)

This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

NONE

1997-12-01T23:59:59.000Z

27

MHK Projects/CETO Precommercial Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Precommercial Pilot Project Precommercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-32.2509,"lon":115.651,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

28

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt058tikelly2011p.pdf More Documents & Publications Texas Propane Vehicle Pilot Project Texas...

29

US Virgin Islands EDIN Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Islands EDIN Pilot Project Islands EDIN Pilot Project Jump to: navigation, search Logo: EDIN US Virgin Islands Pilot Project Name EDIN US Virgin Islands Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Low emission development planning, Background analysis Website http://www.edinenergy.org/usvi Country United States Northern America References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

30

EIS-0207: Newberry Geothermal Pilot Project  

Broader source: Energy.gov [DOE]

The U.S. Forest Service prepared this statement to analyze three alternatives and associated environmental impacts for it to enable the CEE Exploration Company of Portland, Oregon to build and operate a geothermal pilot project and supporting facilities capable of generating 33 megawatts of electric power in the Deschutes National Forest in central Oregon. The Department of Energys Bonneville Power Administration (BPA) served as a cooperating agency in preparing this statement in order to fulfill its National Environmental Policy Act obligations ahead of its statutory obligations to purchase and transmit power to customers in the Pacific Northwest, if it is decided that the project will proceed. BPA adopted this statement by October 1994.

31

Perspectives in Practice A Garden Pilot Project Enhances Fruit and  

E-Print Network [OSTI]

RESEARCH Perspectives in Practice A Garden Pilot Project Enhances Fruit and Vegetable Consumption among Children STEPHANIE HEIM, MPH, RD; JAMIE STANG, PhD, MPH, RD; MARJORIE IRELAND, PhD ABSTRACT Fruit a strategy for increasing fruit and vegetable intake in chil- dren. A 12-week pilot intervention was designed

Maxwell, Bruce D.

32

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

Wind Powering America (EERE)

5 - January 2010 5 - January 2010 Two 600-kW wind turbines were installed on Deer Island in August 2009 next to the wastewater treatment facility's anaerobic digesters. Due to their proximity to Logan Airport, these generators were installed on unusually short 32-meter towers. WIND AND HYDROPOWER TECHNOLOGIES PROGRAM continued on page 2 > Kathryn Craddock, Sustainable Energy Advantage, LLC/PIX16710 Wind Projects Sprout Throughout New England NEWF is pleased to provide you with its fifth edition of the electronic NEWF newsletter. This newsletter provides updates on a broad range of project proposals and policy initiatives across New England during the funding hiatus...consider it a "catch-up" double issue. In past newsletters, we've relied on wind farm photo-simulations, photos of early construction

33

Texas Offshore Pilot Research Project | Open Energy Information  

Open Energy Info (EERE)

Texas Offshore Pilot Research Project Texas Offshore Pilot Research Project Jump to: navigation, search Name Texas Offshore Pilot Research Project Facility Texas Offshore Pilot Research Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.186°, -97.077° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.186,"lon":-97.077,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

34

Michigan Offshore Wind Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Offshore Wind Pilot Project Offshore Wind Pilot Project Jump to: navigation, search Name Michigan Offshore Wind Pilot Project Facility Michigan Offshore Wind Pilot Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Mighigan Alternative and Renewable Energy Center Developer Mighigan Alternative and Renewable Energy Center Location Muskegon Lake MI Coordinates 43.231°, -86.307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.231,"lon":-86.307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

35

Harvard Catalyst Pilot Grants Projects Funded for Year Three  

E-Print Network [OSTI]

Harvard Catalyst Pilot Grants Projects Funded for Year Three Experimental Approach to Genotype the Harvard Catalyst Program we aim to:1) Review, select and culturally adapt evidence-based modules from

Paulsson, Johan

36

EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii |  

Broader source: Energy.gov (indexed) [DOE]

1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii 1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii Summary This EA evaluates the environmental impacts of a proposal, through a cooperative agreement with Phycal, Inc. to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost information and test data to access its viability for implementation at a future commercial scale. If approved, DOE would provide approximately 80 percent of the funding for the project. Public Comment Opportunities

37

NETL: Ion Advanced Solvent CO2 Capture Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ion Advanced Solvent CO2 Capture Pilot Project Ion Advanced Solvent CO2 Capture Pilot Project Project No.: DE-FE0013303 ION Engineering is conducting small pilot-scale (~ 0.7 MW) testing of an advanced CO2 capture solvent technology that has previously undergone bench-scale testing. The small pilot-scale testing will involve continuous long-term operation in order to gather the necessary data ultimately required for further scale-up. Activities will include the design and fabrication of the 0.5-0.7 MWe (equivalent) slipstream pilot plant; scale-up of solvent manufacturing; testing, data collection, and analysis of solvent performance; degradation and air emission analysis; modeling and simulation for the detailed preliminary and final techno-economic analyses; and decommissioning of pilot plant equipment upon completion of solvent testing. The advanced solvent is anticipated to have significant operating and capital cost advantages over other solvents currently in development. Advantages include significant reductions in parasitic load and liquid flow rates which directly translate to smaller more efficient CO2 capture processes. Make-up water and amine emissions rates will be examined during this project. There is the potential that additional solvent, system, and integration savings will be identified, which could result in further operating and capital cost reductions.

38

Regional Drinking Water Security District Level Pilot Project  

E-Print Network [OSTI]

Regional Drinking Water Security District Level Pilot Project Concept Note Milind Sohoni Head that most habitations of several talukas will face drinking water stress for much of the coming year. The central objective of the project will be to ensure regional drinking water security for a district

Sohoni, Milind

39

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network [OSTI]

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

40

Microsoft Word - P-12711 Cobscook Bay Project EA.doc  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PROJECT PILOT LICENSE Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 (DOE/EA1916) Maine Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 January 2012 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects(Redirected from MHK Projects/bioSTREAM Pilot Plant) Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

42

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop  

E-Print Network [OSTI]

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop with Lessons Learned John C-scale Aerodynamic Optimization Workshop. Three independent optimization efforts were conducted concurrently, each in the preparation of a possible future workshop on aerodynamic shape optimization. 1.0 Introduction During AIAA

Jameson, Antony

43

Results from the Texas Pilot Project on Superior Energy Performance  

E-Print Network [OSTI]

Energy Performance. Five plants in Texas are participating in this national pilot project, which began July 2008. ESL-IE-09-05-02 Proceedings of the Thirty-First Industrial Energy Technology Conference, New Orleans, LA, May 12-15, 2009 ...

Ferland, K.

44

Hydrogen Pilot Project Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Project Wind Farm Project Wind Farm Jump to: navigation, search Name Hydrogen Pilot Project Wind Farm Facility Hydrogen Pilot Project Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Idaho Synthetic Fuels Developer Idaho Synthetic Fuels Location South of Boise ID Coordinates 43.5141°, -116.088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.5141,"lon":-116.088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

45

Types of Hydropower Plants  

Broader source: Energy.gov [DOE]

There are three types of hydropower facilities: impoundment, diversion, and pumped storage. Some hydropower plants use dams and some do not. The images below show both types of hydropower plants.

46

Flexible hydropower: boosting energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Flexible hydropower: boosting energy Flexible hydropower: boosting energy New hydroelectric resource for Northern New Mexico supplies clean energy to homes, businesses and the Lab....

47

Airline Pilot Demand Projections What this is-  

E-Print Network [OSTI]

sources of fleet projections Utilized Boeing Fleet assumptions to try and fill in Gaps (1.4% annual fleet growth) Aircraft Orders 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Boeing 737 Max 8/9 0 0 0 0 1 7 7 7 7 7 Boeing 737 700 0 0 0 0 0 0 0 0 0 0 Boeing 737 800 0 0 0 0 0 0 0 0 0 0 Boeing 737 900 9 6 6 6

Bustamante, Fabián E.

48

Considering Climate Change in Hydropower Relicensing  

E-Print Network [OSTI]

Considering Climate Change in Hydropower Relicensing ENVIRONMENTAL AREA RESEARCH PIER Environmental climate change when relicensing hydropower units, stating that there is a lack of scientific information this project, researchers are conducting an environmental study on climate change for the Yuba River

49

Hydropower Potential Screening Study  

E-Print Network [OSTI]

Hydropower Potential Screening Study Gillian Charles GRAC 5/28/14 #12;Latest Hydropower Potential Study Creating a Buzz 2014 DOE study on undeveloped stream reaches 84.7 GW undeveloped hydropower in undeveloped stream reaches hydropower in the PNW #12;Studies at both National

50

Waste Isolation Pilot Plant, Former Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Construction Worker Screening Construction Worker Screening Projects Waste Isolation Pilot Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

51

MHK Projects/bioWAVE Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

bioWAVE Pilot Plant bioWAVE Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-37.8197,"lon":144.964,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

52

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

53

Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects  

SciTech Connect (OSTI)

This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

Veselka, T.D.; Folga, S.; Poch, L.A. [and others

1995-03-01T23:59:59.000Z

54

Exempting Kansas City Pilot Project from Department of Energy Orders  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

In a January 18, 2011, memorandum, "Exempting Kansas City Pilot Project from Department of Energy Orders," Linton F. Brooks requested that the Kansas City Site Office develop a plan to dramatically shift oversight at the Kansas City Plant from the current approach to one that relies more heavily on: (1) the expertise of the contractor's parent organization; (2) a more functional management assurance system with real time management information provided by the contractor to the Site Office; and, (3) Federal operational awareness based on KCSO's Line Management Plan. Directives from which KCP would be exempted are DOE O 442.1A, DOE P 450.4, and the 470-series directives.

2011-01-18T23:59:59.000Z

55

Types of Hydropower Turbines | Department of Energy  

Energy Savers [EERE]

type of hydropower turbine selected for a project is based on the height of standing water-referred to as "head"-and the flow, or volume of water, at the site. Other deciding...

56

Conventional Hydropower Technologies, Wind And Water Power Program...  

Office of Environmental Management (EM)

Power for a Clean Energy Future (Fact Sheet), Wind and Water Power Program (WWPP) Hydropower Projects Environmental Impacts of Increased Hydroelectric Development at Existing Dams...

57

Anfu Guanshan Hydropower Development Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Co.,Ltd Place: Jiangxi Province, China Zip: 343009 Sector: Hydro Product: China-based small hydro project developer. References: Anfu Guanshan Hydropower Development Co.,Ltd1...

58

The first pilot project of the consortium for top?down...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

USA Received: October 1, 2013 Revised: February 25, 2014 Accepted: March 13, 2014 Pilot Project 1-the identification and characterization of human histone H4 proteoforms by...

59

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project  

Open Energy Info (EERE)

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Jump to: navigation, search Logo: US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Name US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Background analysis, Low emission development planning Website http://www.edinenergy.org/usvi Country US Virgin Islands Latin America and the Caribbean References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

60

Energy 101: Hydropower  

ScienceCinema (OSTI)

Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.

None

2013-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

National Hydropower Map  

Broader source: Energy.gov [DOE]

High-resolution map produced by Oak Ridge National Laboratory showing hydropower resources throughout the United States.

62

Energy 101: Hydropower  

SciTech Connect (OSTI)

Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.

None

2013-04-01T23:59:59.000Z

63

Projects selected in todays announcement will focus on updating technologies and methods to improve the performance of conventional hydropower plants  

Broader source: Energy.gov (indexed) [DOE]

in today's announcement will focus on updating technologies in today's announcement will focus on updating technologies and methods to improve the performance of conventional hydropower plants. The projects selected for negotiation of awards include: Dehlsen Associates, LLC (Carpinteria, CA) will further develop and validate the Aquantis Current Plane ocean current turbine technology. The project will validate analytical design tools and develop the technology's direct drive component. DOE share: up to $750,000; Duration: up to 2 years Dehlsen Associates, LLC (Carpinteria, CA) will first develop a bottom habitat survey methodology and siting study approach in accordance with all relevant regulatory agencies in the southeast Florida region; then they will determine the most suitable areas for mooring marine and hydrokinetic facilities based on the

64

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

LED Light Pilot Project Illuminates the Way in Alabama LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

65

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

66

$26.6 Million for Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

$26.6 Million for Hydropower $26.6 Million for Hydropower $26.6 Million for Hydropower April 5, 2011 - 4:52pm Addthis Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs Today, the Department of Energy and the Department of Interior announced $26.6 million of available funding for companies and entrepreneurs looking to advance hydropower. "By improving hydropower technology, we can maximize America's biggest source of renewable energy in an environmentally responsible way," said Secretary Chu. Specifically, funding is available for projects in the following four areas: Sustainable small hydropower Environmental mitigation technologies for conventional hydropower

67

Antu County 303 Hydropower Station Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Antu County 303 Hydropower Station Co Ltd Antu County 303 Hydropower Station Co Ltd Jump to: navigation, search Name Antu County 303 Hydropower Station Co., Ltd. Place Jilin Province, China Zip 133613 Sector Hydro Product China-based small hydro CDM project developer. References Antu County 303 Hydropower Station Co., Ltd.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Antu County 303 Hydropower Station Co., Ltd. is a company located in Jilin Province, China . References ↑ "Antu County 303 Hydropower Station Co., Ltd." Retrieved from "http://en.openei.org/w/index.php?title=Antu_County_303_Hydropower_Station_Co_Ltd&oldid=342210" Categories: Clean Energy Organizations Companies Organizations

68

MHK Projects/Muroran Institute of Technology Pilot Project | Open Energy  

Open Energy Info (EERE)

Technology Pilot Project Technology Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.5197,"lon":136.319,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

69

MHK Projects/Makah Bay Offshore Wave Pilot Project | Open Energy  

Open Energy Info (EERE)

Makah Bay Offshore Wave Pilot Project Makah Bay Offshore Wave Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.3238,"lon":-124.682,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

70

Large-Scale Hydropower Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

71

Large-Scale Hydropower Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

72

Upper Middle Mainstem Columbia River Subbasin Water Quality Parameters Affected by Hydropower Production  

E-Print Network [OSTI]

by Hydropower Production Total Dissolved Gas Total dissolved gas (TDG) supersaturation often occurs during periods of high runoff and spill at hydropower projects and can be harmful to fish. Supersaturation occurs of hydropower projects on Columbia River water temperature has been to delay the time when thermal maximums

73

Downstream Fish Passage through Hydropower One of the most widespread environmental constraints to the development of hydropower in the U.S.  

E-Print Network [OSTI]

Downstream Fish Passage through Hydropower Turbines Background One of the most widespread environmental constraints to the development of hydropower in the U.S. is the provision of adequate fish passage at projects. Mortality of downstream migrating fish, particularly as a result of passing through hydropower

74

A Pilot Project for Eco Industrial Parks in North Rhine-Westphalia - Extended Abstract  

Science Journals Connector (OSTI)

The state of North Rhine-Westphalias pilot project for Eco Industrial Parks aims to integrate ecological, economic, and social considerations into the planning, development and operation of new and existing i...

Veronika Wolf

2007-01-01T23:59:59.000Z

75

How Run-of-River Operation Affects Hydropower Generation Henriette I. Jager Mark S. Bevelhimer  

E-Print Network [OSTI]

How Run-of-River Operation Affects Hydropower Generation and Value Henriette I. Jager ? Mark S) are mandated to protect aquatic biota, (2) decrease hydropower generation per unit flow, and (3) decrease energy revenue. We tested these three assump- tions by reviewing hydropower projects with license

Jager, Henriette I.

76

Conventional Hydropower Technologies (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes the DOE Water Power Program's conventional hydropower research and development efforts.

Not Available

2011-07-01T23:59:59.000Z

77

Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report  

SciTech Connect (OSTI)

Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

R. Johansen

2011-09-01T23:59:59.000Z

78

Hydropower Research & Development | Department of Energy  

Energy Savers [EERE]

Development Hydropower Research & Development Hydropower Research & Development The Water Power Program's hydropower research and development (R&D) efforts focus on advancing...

79

Boosting America's Hydropower Output | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Boosting America's Hydropower Output Boosting America's Hydropower Output Boosting America's Hydropower Output October 9, 2012 - 2:10pm Addthis The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado.

80

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Broader source: Energy.gov (indexed) [DOE]

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Event:Hydropower Africa 2012 | Open Energy Information  

Open Energy Info (EERE)

2012 2012 Jump to: navigation, search Calendar.png Hydropower Africa 2012: on 2012/09/04 "Hydropower Africa 2012 is the largest hydropower event of its kind in Africa boasting over 450 visitors from across the globe. It looks at planned projects and tender prospects for hydropower development in Africa and innovative funding solutions for projects - big and small. Refurbishment and modernisation updates of major hydropower facilities as well as operation and maintenance best practices from across the continent will be presented and discussed. Infrastructure development and African-appropriate engineering solutions to provide power to villages, rural areas and urban communities and achieving operational objectives while addressing environment and social challenges will be examined through

82

Benefits of Hydropower  

K-12 Energy Lesson Plans and Activities Web site (EERE)

There are many advantages to hydropower than conventional methods of generating electricity, from being a renewable, sustainable resource, to being a reliable back-up source of energy when there are disruptions to electricity.

83

Hydropower Memorandum of Understanding  

Broader source: Energy.gov [DOE]

On March 24, 2010, the Department of the Army (DOA) through the U.S. Army Corps of Engineers (USACE or Corps), the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to help meet the nations needs for reliable, affordable, and environmentally sustainable hydropower by building a long

84

Steam-foam pilot project in Dome-Tumbador, Midway-Sunset field  

SciTech Connect (OSTI)

This paper describes a steam-foam pilot project in the Potter sand, Midway-Sunset field. The pilot consists of four inverted five-spot patterns with a confined producer covering 5.2 acres (2.1 ha). Steam foam was generated by continuous injection of steam with NaCl, alpha olefin sodium sulfonate, and nitrogen. Production and subsurface data, obtained from two observation wells, were used as monitoring tools in the pilot. Overall, during the first 2 years of foam injection, 207,000 bbl (32 900 m/sup 3/) of incremental oil was produced.

Not Available

1989-02-01T23:59:59.000Z

85

DOE/NREL Inner Mongolia PV/Wind Hybrid Systems Pilot Project: A Post-Installation Assessment  

SciTech Connect (OSTI)

This report assesses the Inner Mongolia Pilot Project, which disseminates wind-solar hybrid systems to a rural and remote population.

Stroup, K. K.

2005-02-01T23:59:59.000Z

86

Huaneng Lancang River Hydropower | Open Energy Information  

Open Energy Info (EERE)

Lancang River Hydropower Lancang River Hydropower Jump to: navigation, search Name Huaneng Lancang River Hydropower Place Kunming, Yunnan Province, China Zip 650214 Sector Hydro, Solar Product Developer of hydro and solar power projects. Coordinates 25.051001°, 102.702011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.051001,"lon":102.702011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

87

Idaho National Laboratory - Hydropower Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineering Research and Development Engineering Research and Development 1997 Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation, 1997, Development of a More Fish-Tolerant Turbine Runner, Advanced Hydropower Turbine Project, ARL Report No. 13-97/M63F, DOE/ID-10571. Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation conducted a research program to develop a turbine runner which will minimize fish injury and mortality at hydroelectric projects. An existing pump impeller provided the starting point for developing the fish-tolerant turbine runner. The Hidrostal pump is a single-bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of this research project was to develop a new runner geometry which is effective in downstream fish passage and

88

Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.  

SciTech Connect (OSTI)

The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

1997-05-01T23:59:59.000Z

89

hydropower | OpenEI  

Open Energy Info (EERE)

hydropower hydropower Dataset Summary Description No description given. Source National Renewable Energy Laboratory Date Released July 03rd, 2012 (2 years ago) Date Updated July 03rd, 2012 (2 years ago) Keywords biopower csp geothermal hydropower hydrothermal Renewable Energy Technical Potential rooftop United States utility-scale wind Data text/csv icon United States Renewable Energy Technical Potential (csv, 7.7 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote

90

Microsoft Word - PhycalAlgaePilotProject_NEPAFinalEA_October2011.doc  

Broader source: Energy.gov (indexed) [DOE]

Phycal Algae Pilot Project DOE/EA-1829 Phycal Algae Pilot Project DOE/EA-1829 Phycal, Inc. November 2011 National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of carbon dioxide (CO 2 ) emissions from industrial sources for green energy products. This project would use CO 2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost information and test data to assess its viability for future implementation at commercial scale. If approved, DOE would provide approximately 80 percent of the funding for the project.

91

Small Businesses Key in Hydropower Tech Advancement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Businesses Key in Hydropower Tech Advancement Businesses Key in Hydropower Tech Advancement Small Businesses Key in Hydropower Tech Advancement September 6, 2011 - 2:59pm Addthis Earlier today, the Department of Energy and the Department of Interior announced nearly $17 million in funding over the next three years to advance hydropower technology. The funding announced today will go to sixteen innovative projects around the country, including sustainable small hydro projects, like the ones from Hydro Green Energy, a small business that handles hydroelectric power generation and power and communication line construction. The company, which has eight employees currently, has been awarded funding for two projects. Near Space Systems, a Colorado Springs-based company, is a service-disabled veteran-owned business with a manufacturing focus that's

92

NIDIS Weekly Climate, Water and Drought Assessment Summary Upper Colorado River Basin Pilot Project  

E-Print Network [OSTI]

the past week which should decrease irrigation water demand from the Western Slope. Areas of SW Colorado of moisture moving over western Colorado on Tuesday will spark off widely scattered showers in the highNIDIS Weekly Climate, Water and Drought Assessment Summary Upper Colorado River Basin Pilot Project

93

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project was  

E-Print Network [OSTI]

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project grant was developed for the purposes of providing faculty, students and staff the opportunity to work Ways to School," which promotes safe, healthy, sustainable transportation options to local schools. Now

Pulfrey, David L.

94

Renewable Energy in China: Xiao Qing Dao Village Power Wind/Diesel Hybrid Pilot Project  

SciTech Connect (OSTI)

In 2000, DOE/NREL and the State Power Corporation of China (SPCC) developed a pilot project to electrify Xiao Qing Dao, a small island located in China's Yellow Sea. The project demonstrates the practicality of renewable energy systems for medium-scale, off-grid applications. It consists of four 10 k-W wind turbines connected to a 30-kW diesel generator, a 40-kW inverter and a battery bank.

Not Available

2006-01-01T23:59:59.000Z

95

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Broader source: Energy.gov [DOE]

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

96

Nevada: Kingston Creek Hydro Project Powers 100 Households  

Broader source: Energy.gov [DOE]

Hydropower project produces enough electricity to annually power nearly 100 typical American households.

97

NREL: Learning - Pumped Hydropower  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pumped Hydropower Pumped Hydropower Pumped hydro facilities use off-peak electricity to pump water from a lower reservoir into one at a higher elevation. When the water stored in the upper reservoir is released, it is passed through hydraulic turbines to generate electricity. The off-peak electrical energy used to pump the water up hill can be stored indefinitely as gravitational energy in the upper reservoir. Thus, two reservoirs in combination can be used to store electrical energy for a long period of time, and in large quantities. Utilities generally prefer to operate large coal and nuclear power stations at full power all the time (referred to as "baseload generation"), so in the middle of the night, these plants often produce more power than is needed. Pumped hydro energy storage can be used to smooth out the demand

98

How Hydropower Works | Department of Energy  

Energy Savers [EERE]

How Hydropower Works How Hydropower Works Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player Hydropower is using water to power machinery...

99

A Boost for Hydropower (and the Economy) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) September 20, 2010 - 5:29pm Addthis The 91-year old Cheoah Dam in Robbinsville, North Carolina. The 91-year old Cheoah Dam in Robbinsville, North Carolina. Jacques Beaudry-Losique Director, Wind & Water Program There are approximately 2,400 hydropower dams in the U.S., many of which have not undergone a significant upgrade in decades. These older dams present a great opportunity to expand clean energy across the country, allowing us to rapidly increase generation capacity through the installation of new high-efficiency equipment. I recently got a firsthand look at one such effort when I helped kick off a project to modernize the 91-year old Cheoah Dam in Robbinsville, North

100

National Hydropower Association Annual Conference  

Broader source: Energy.gov [DOE]

Join industry leaders, state and federal regulatory officials, and key legislative staff to discuss technology, policy and future development options for the hydropower industry at the National...

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

History of Hydropower | Department of Energy  

Energy Savers [EERE]

History of Hydropower History of Hydropower Humans have been harnessing water to perform work for thousands of years. The Greeks used water wheels for grinding wheat into flour...

102

NREL: Climate Neutral Research Campuses - Hydropower  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

organizations that are not electric utilities. The following resources explain the fundamentals of hydropower and ocean energy technologies: Hydropower Basics: The DOE Wind...

103

Macroalgae for CO{sub 2} Capture and Renewable Energy - A Pilot Project  

SciTech Connect (OSTI)

The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO{sub 2}) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO{sub 2}/ NO{sub x} flue-gas removal efficiency of an innovative ??algal scrubber? technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO{sub 2} to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing contingencies, and reducing overall costs.

Kristine Wiley

2010-10-31T23:59:59.000Z

104

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project  

SciTech Connect (OSTI)

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

Dodds, K.; Daley, T.; Freifeld, B.; Urosevic, M.; Kepic, A.; Sharma, S.

2009-05-01T23:59:59.000Z

105

2014 Water Power Program Peer Review: Hydropower Technologies, Compiled Presentations (Presentation)  

SciTech Connect (OSTI)

This document represents a collection of all presentations given during the EERE Wind and Water Power Program's 2014 Hydropower Peer Review. The purpose of the meeting was to evaluate DOE-funded hydropower and marine and hydrokinetic R&D projects for their contribution to the mission and goals of the Water Power Program and to assess progress made against stated objectives.

Not Available

2014-02-01T23:59:59.000Z

106

Pilot Scale Tests Alden/Concepts NREC Turbine  

SciTech Connect (OSTI)

Alden Research Laboratory, Inc. has completed pilot scale testing of the new Alden/Concepts NREC turbine that was designed to minimize fish injury at hydropower projects. The test program was part of the U.S. Department of Energy's Advanced Hydropower Turbine Systems Program. The prototype turbine operating point was 1,000 cfs at 80ft head and 100 rpm. The turbine was design to: (1) limit peripheral runner speed; (2) have a high minimum pressure; (3) limit pressure change rates; (4) limit the maximum flow shear; (5) minimize the number and total length of leading blade edges; (6) maximize the distance between the runner inlet and the wicket gates and minimize clearances (i.e., gaps) between other components; and (7) maximize the size of flow passages.

Thomas C. Cook; George E.Hecker; Stephen Amaral; Philip Stacy; Fangbiao Lin; Edward Taft

2003-09-30T23:59:59.000Z

107

MHK Projects/Neptune Renewable Energy 1 10 Scale Prototype Pilot Test |  

Open Energy Info (EERE)

Renewable Energy 1 10 Scale Prototype Pilot Test Renewable Energy 1 10 Scale Prototype Pilot Test < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.7123,"lon":-0.38306,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

108

6.15 - Pumped Storage Hydropower Developments  

Science Journals Connector (OSTI)

Abstract This chapter details how pumped storage hydroelectric projects differ from conventional hydroelectric projects. The concept of electrical energy storage has become a controversial issue in recent years. Many questions are raised in the electricity sector: Why is energy storage needed? What are the alternatives? One of the answers is pumped storage hydropower plants, using mainly pumpturbines. In this chapter, details of some remarkable examples of pumped storage power plants are given: Okinawa Seawater in Japan, Goldisthal in Germany, Tianhuangping in China, and Coo-Trois Ponts in Belgium.

T. Hino; A. Lejeune

2012-01-01T23:59:59.000Z

109

Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value...  

Broader source: Energy.gov (indexed) [DOE]

Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S. Pumped Storage Hydropower...

110

Condensed listing of surface boreholes at the Waste Isolation Pilot Plant Project through 31 December 1995  

SciTech Connect (OSTI)

This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreholes drilled for the purpose of site selection and characterization through 31 December 1995. The US Department of Energy (DOE) sponsored the drilling activities, which were conducted primarily by Sandia National Laboratories. The listing provides physical attributes such as location (township, range, section, and state-plane coordinates), elevation, and total borehole depth, as well as the purpose for the borehole, drilling dates, and information about extracted cores. The report also presents the hole status (plugged, testing, monitoring, etc.) and includes salient findings and references. Maps with borehole locations and times-of-drilling charts are included.

Hill, L.R.; Aguilar, R.; Mercer, J.W. [Sandia National Labs., Albuquerque, NM (United States); Newman, G. [GRAM, Inc., Albuquerque, NM (United States)

1997-01-01T23:59:59.000Z

111

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

112

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

113

Hydropower Basics | Department of Energy  

Energy Savers [EERE]

Basics Hydropower Basics Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player Most people associate water power with the Hoover Dam -- a huge...

114

Hydropower Technology Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

115

Hydropower Technology Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

116

Mobile biometric device (MBD) technology : summary of selected first responder experiences in pilot projects.  

SciTech Connect (OSTI)

Mobile biometric devices (MBDs) capable of both enrolling individuals in databases and performing identification checks of subjects in the field are seen as an important capability for military, law enforcement, and homeland security operations. The technology is advancing rapidly. The Department of Homeland Security Science and Technology Directorate through an Interagency Agreement with Sandia sponsored a series of pilot projects to obtain information for the first responder law enforcement community on further identification of requirements for mobile biometric device technology. Working with 62 different jurisdictions, including components of the Department of Homeland Security, Sandia delivered a series of reports on user operation of state-of-the-art mobile biometric devices. These reports included feedback information on MBD usage in both operational and exercise scenarios. The findings and conclusions of the project address both the limitations and possibilities of MBD technology to improve operations. Evidence of these possibilities can be found in the adoption of this technology by many agencies today and the cooperation of several law enforcement agencies in both participating in the pilot efforts and sharing of information about their own experiences in efforts undertaken separately.

Aldridge, Chris D.

2013-06-01T23:59:59.000Z

117

DOE: Quantifying the Value of Hydropower in the Electric Grid  

SciTech Connect (OSTI)

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

None

2012-12-31T23:59:59.000Z

118

Modeling California's high-elevation hydropower systems in energy units  

E-Print Network [OSTI]

it a valuable renewable energy source. In the mid-1990s, hydropower was about 19% of world's total electricity Development Project, 2007] and almost 75% of the nation's electricity from all renew- able sources [Energy and Oregon, with approximately 27% in Washington (Energy Information Administration, Energy kid's page, 6

Pasternack, Gregory B.

119

Aleo Manali Hydropower Pvt Ltd | Open Energy Information  

Open Energy Info (EERE)

Manali Hydropower Pvt Ltd Manali Hydropower Pvt Ltd Jump to: navigation, search Name Aleo Manali Hydropower Pvt Ltd Place Kullu, Himachal Pradesh, India Zip 203001 Sector Hydro Product Himachal-based small hydro project developer. Coordinates 23.42796°, 84.91112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":23.42796,"lon":84.91112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Small Hydropower Systems: Energy Efficiency and Renewable Energy Clearinghouse (EREC) Fact Sheet  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

you're considering building a small you're considering building a small hydropower system on water flowing through your property, you have a long tradition from which to draw your inspi- ration. Two thousand years ago, the Greeks learned to harness the power of running water to turn the massive wheels that rotated the shafts of their wheat flour grinders. And in the hydropower heyday of the 18th century, thousands of towns and cities worldwide were located around small hydropower sites. Today, small hydropower projects offer emissions-free power solutions for many remote communities throughout the world-such as those in Nepal, India, China, and Peru-as well as for highly industrialized countries, like the United States. This fact sheet will help you determine whether a small hydropower system will

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Energy Department Announces $4.4 Million to Advance Hydropower Manufacturing  

Office of Energy Efficiency and Renewable Energy (EERE)

The Energy Department today announced a total of $4.4 million for two projects in Michigan and Pennsylvania to support the use of advanced materials and manufacturing techniques in the development of new low-head hydropower technologies.

122

CLIMATE CHANGE EFFECTS ON THE HIGHELEVATION HYDROPOWER  

E-Print Network [OSTI]

CLIMATE CHANGE EFFECTS ON THE HIGHELEVATION HYDROPOWER SYSTEM Energy Commission's California Climate Change Center JULY 2012 CEC5002012020 Prepared for: California consideration of climate change effects on highelevation hydropower supply and demand in California. Artificial

123

Harnessing Hydropower: The Earth's Natural Resource  

SciTech Connect (OSTI)

This document is a layman's overview of hydroelectric power. It includes information on: History of Hydropower; Natures Water Cycle; Hydropower Plants; Turbines and Generators; Transmission Systems; power dispatching centers; and Substations. It goes on to discuss The Power Grid, Hydropower in the 21st Century; Energy and the Environment; and how hydropower is useful for Meeting Peak Demands. It briefly addresses how Western Area Power Administration is Responding to Environmental Concerns.

none,

2011-04-01T23:59:59.000Z

124

Technology Cooperation Agreement Pilot Project development-friendly greenhouse gas reduction, May 1999 update  

SciTech Connect (OSTI)

The Technology Cooperation Agreement Pilot Project (TCAPP) was launched by several U.S. Government agencies (USAID, EPA and DOE) in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. TCAPP is currently facilitating voluntary partnerships between the governments of Brazil, China, Kazakhstan, Korea, Mexico, and the Philippines, the private sector, and the donor community on a common set of actions that will advance implementation of clean energy technologies. The six participating countries have been actively engaged in shaping this initiative along with international donors and the private sector. This program helps fulfill the US obligation to support technology transfer to developing countries under Article 4.5 of the United Nations Framework Convention on Climate Change. TCAPP also provides a mechanism to focus resources across international donor programs on the technology cooperation needs of developing and transition countries.

Benioff, R.

1999-05-11T23:59:59.000Z

125

Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.  

SciTech Connect (OSTI)

The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

Stovall, Stacey H.

1994-08-01T23:59:59.000Z

126

Review of Pump as Turbine (PAT) for Micro-Hydropower  

E-Print Network [OSTI]

Abstract Micro-hydropower projects are the excellent alternative for electricity generation in remote areas. These projects can be installed on small streams, rivers, and channels without any recognizable effect on environment. The only problem in micro-hydro projects is the high cost of turbine, for which Pump as Turbine (PAT) is a successful solution. An objective of the present study is to review the selection criteria of PAT for various hydropower sites having different potential. Since no general model has been developed which can be used to calculate the conversion factors for PAT, so this paper focuses on the research that have been carried out in this field. The limitations of the various available models and other selection criteria have also been discussed in this paper.

Tarang Agarwal

127

Federal Memorandum of Understanding for Hydropower/Resources | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower/Resources Memorandum of Understanding for Hydropower/Resources < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources MOU Related Resources Hydropower Resources Assessment at Existing Reclamation Facilities An Assessment of Energy Potential at Non-Powered Dams in the United States Assessment of Potential Capacity Increases at Existing Hydropower Plants Site Inventory and Hydropower Energy Assessment of Reclamation Owned Conduits Potential Hydroelectric Development at Existing Federal Facilities Advanced Conventional Hydropower Planning and Operation Analysis Tools The Integrated Basin-Scale Opportunity Assessment Initiative, FY

128

HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT  

SciTech Connect (OSTI)

The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

HERTING DL

2008-09-16T23:59:59.000Z

129

Optimal Hydropower Reservoir Operation with Environmental Requirements MARCELO ALBERTO OLIVARES  

E-Print Network [OSTI]

Optimal Hydropower Reservoir Operation with Environmental Requirements By MARCELO ALBERTO OLIVARES Engineering Optimal Hydropower Reservoir Operation with Environmental Requirements Abstract Engineering solutions to the environmental impacts of hydropower operations on downstream aquatic ecosystem are studied

Lund, Jay R.

130

ORIGINAL ARTICLE Hydropower development in the lower Mekong basin  

E-Print Network [OSTI]

ORIGINAL ARTICLE Hydropower development in the lower Mekong basin: alternative approaches to deal hydropower generation and potentially irreversible negative impacts on the ecosystems that provide hydropower generation and potentially irreversible negative impacts on the ecosystems that provide

Vermont, University of

131

Sensor Fish Re-design to Support Advance Hydropower Development...  

Broader source: Energy.gov (indexed) [DOE]

Sensor Fish Re-design to Support Advance Hydropower Development Sensor Fish Re-design to Support Advance Hydropower Development Sensor Fish Re-design to Support Advance Hydropower...

132

Hydropower Resource Assessment and Characterization | Department...  

Energy Savers [EERE]

Assessment and Characterization Hydropower Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the total technically...

133

Hydropower Market Acceleration and Deployment | Department of...  

Office of Environmental Management (EM)

Impacts and Mitigation Hydropower can have adverse environmental impacts on fish populations and migrations, on water quality in reservoirs and downstream from dams,...

134

Hydropower and Ocean Energy Resources and Technologies  

Broader source: Energy.gov [DOE]

This page provides a brief overview of hydropower and ocean energy resources and technologies supplemented by specific information to apply these technologies within the Federal sector.

135

Federal Memorandum of Understanding for Hydropower/Federal Inland  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Federal Memorandum of Understanding for Hydropower/Federal Inland Hydropower Working Group < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Inland Hydropower Working Group The Federal Inland Hydropower Working Group is made up of 15 federal entities involved in the regulation, management, or development of hydropower resources (including hydrokinetics) in rivers and streams of the

136

Federal Energy Management Program: Hydropower and Ocean Energy Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydropower and Hydropower and Ocean Energy Resources and Technologies to someone by E-mail Share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Facebook Tweet about Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Twitter Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Google Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Delicious Rank Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Digg Find More places to share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on AddThis.com... Energy-Efficient Products

137

Quantifying the Value of Hydropower in the Electric Grid: Final...  

Energy Savers [EERE]

research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid....

138

The Rosetta Resources CO2 Storage Project - A WESTCARB Geologic Pilot Test  

E-Print Network [OSTI]

and testing the wells. Capay Shale Gas Reservoir Pilot Thethe 2-3 m thick Capay Shale gas interval containing methanedepleted gas reservoir located within the Middle Capay shale

2006-01-01T23:59:59.000Z

139

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect (OSTI)

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

140

Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight against glo  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: SUSTAINABLE DEVELOPMENT OF HYDROPOWER INITIATIVE At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers pledged to establish the Sustainable Development of Hydropower Initiative to promote the sustainable use of hydropower in developing countries in regions such as Africa, Asia, and Central America, and to identify potential financial resources from multilateral organizations to advance such projects.

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

U.S. Hydropower Resource Assessment - California  

SciTech Connect (OSTI)

The U.S. Department of Energy is developing an estimate of the underdeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of California.

A. M. Conner; B. N. Rinehart; J. E. Francfort

1998-10-01T23:59:59.000Z

142

US hydropower resource assessment for Utah  

SciTech Connect (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Utah.

Francfort, J.E.

1993-12-01T23:59:59.000Z

143

US hydropower resource assessment for Colorado  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the hydropower development potential in this country. Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE, menu-driven software application. HES allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Colorado.

Francfort, J.E.

1994-05-01T23:59:59.000Z

144

Disappearing rivers The limits of environmental assessment for hydropower in India  

SciTech Connect (OSTI)

The mountain rivers of the Indian Himalaya possess a vast potential for hydropower generation. After decades of comparatively modest development recent years have seen a major intensification in the construction of new hydropower dams. Although increasingly portrayed as a form of renewable energy generation, hydropower development may lead to extensive alterations of fluvial systems and conflicts with resource use patterns of local communities. To appraise and reduce adverse effects is the purpose of statutory Environmental Impact Assessments (EIA) and corresponding mitigation plans. However, in the light of ambitious policies for hydropower expansion conventional approaches of environmental assessment are increasingly challenged to keep up with the intensity and pace of development. This paper aims to explore the systemic limitations of environmental assessment for hydropower development in the Indian state of Himachal Pradesh. Based on a qualitative methodology involving interviews with environmental experts, document reviews and field observations the study suggests that the current practice of constraining EIAs to the project level fails to address the larger effects of extensive hydropower development. Furthermore, it is critically discussed as to what extent the concept of Strategic Environmental Assessment (SEA) might have the potential to overcome existing shortcomings.

Erlewein, Alexander, E-mail: erlewein@sai.uni-heidelberg.de

2013-11-15T23:59:59.000Z

145

Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project  

SciTech Connect (OSTI)

Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

1995-07-01T23:59:59.000Z

146

Hydropower: Setting a Course for Our Energy Future  

SciTech Connect (OSTI)

Hydropower is an annual publication that provides an overview of the Department of Energy's Hydropower Program. The mission of the program is to conduct research and development that will increase the technical, societal, and environmental benefits of hydropower and provide cost-competitive technologies that enable the development of new and incremental hydropower capacity.

Not Available

2004-07-01T23:59:59.000Z

147

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 2. Preliminary pilot plant design  

SciTech Connect (OSTI)

The preliminary design of a solar water desalination pilot plant is presented. Pilot plant drawings and process descriptions are provided. Use of solar and wind energy are discussed. Testing, performance and cost of the pilot plant are studied. (BCS)

Not Available

1986-01-01T23:59:59.000Z

148

Hydropower'10 6th International Hydropower Conference, 13 February 2010, Troms, NORWAY Understanding Future Climate Impacts on Scotland's  

E-Print Network [OSTI]

Hydropower'10 ­ 6th International Hydropower Conference, 13 February 2010, Tromsø, NORWAY Understanding Future Climate Impacts on Scotland's Hydropower Resource Niall Duncan*, Gareth. P. Harrison and A energy by 2020. As hydropower currently makes up over 10% (1383 MW) of Scotland's installed generation

Harrison, Gareth

149

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network [OSTI]

water heater (EWH) load control program operated as part of PJM Interconnections Demand ResponseDemand Response Economic and Emergency Load Response Programs Electric Thermal Storage Electric Water Heaterwater pumps and electric thermal storage space heaters. The CSP is also participating in PJMs pilot Demand Response

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

150

Waste Isolation Pilot Plant. Project progress report for month ending October 31, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes, both remote handled and contact handled, which requires deep geologic disposal, and to provide a separate underground facility for in-situ experiments with various waste forms. Activities in the design, technical support, and scientific program of WIPP are summarized in this report. (DLC)

Not Available

1980-01-01T23:59:59.000Z

151

Waste Isolation Pilot Plant. Project progress report for month ending September 30, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes and to provide a separate underground facility for in-situ experiments. This document summarizes activities in the WIPP design, technical support, and scientific program for this month.

Not Available

1980-01-01T23:59:59.000Z

152

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

alternative energy educational program, Project SAW: Solar -Solar Energy Research Commission are interested in the program. Projectsolar energy. Award: Pro ect Term: ect Descr 14 months (Project

Case, C.W.

2011-01-01T23:59:59.000Z

153

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint  

SciTech Connect (OSTI)

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

Deru, M.; Field, K.; Punjabi, S.

2014-08-01T23:59:59.000Z

154

Brainpower for Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

155

Brainpower for Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

156

Microsoft Word - Hydropower Council Agenda 2007.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional Hydropower Council Vicksburg, Mississippi June 12, 2007 Tuesday, June 12 1:00 p.m. Welcome Vicksburg District 1:05 p.m. Introductions All 1:15 p.m. Presentation of the...

157

Hydropower Resource Assessment of Brazilian Streams  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information system (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.

Douglas G. Hall

2011-09-01T23:59:59.000Z

158

MHK Technologies/Kinetic Hydropower System KHPS | Open Energy Information  

Open Energy Info (EERE)

Kinetic Hydropower System KHPS Kinetic Hydropower System KHPS < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Verdantpower.jpg Technology Profile Primary Organization Verdant Power Project(s) where this technology is utilized *MHK Projects/Roosevelt Island Tidal Energy RITE *MHK Projects/Cornwall Ontario River Energy CORE Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 7/8: Open Water System Testing & Demonstration & Operation Technology Description Verdant Power's central technology is the Kinetic Hydropower System (KHPS), a water-to-wire system that consists of three main components: 1) KHPS TURBINE: a three-bladed horizontal-axis turbine with four major assemblies: a) Composite rotor with 3-fixed blades that rotate at the relatively slow and constant speed of approximately 40 RPM, with tip-speeds of 35 feet per second. This is well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. b) Sealed nacelle, pylon and passive yaw mechanism that is hydrodynamically designed to allow the turbine to self-rotate into the prevailing current (like a weathervane) so that the blades are optimally aligned to generate energy. c) Custom-designed drivetrain unit (with induction generator) enclosed within the nacelle that integrates the bearing housing with a special long-life planetary gearbox, with mechanical shaft seals and a minimum of sealed lubricants. d) Streambed mounting system that can vary depending on site conditions as a single drilled monopile, a single gravity-based structure, or a gravity-based triframe mount that supports 3 turbines. 2) UNDERWATER CABLING: low-voltage shielded cable of short distance; and shoreline switchgear vaults, control room, and interconnection point(s). 3) APPURTENANT FACILITIES: for navigation safety, such as Public Aides to Navigation (PATON) buoys and lighted warning signs, as well as instrumentation including Acoustic Doppler Current Profilers (ADCPs). In order to maximize the application of the KHPS within the global MHK resource, Verdant Power has designed the technology as a simple and uniquely scalable system that can be operated in tidal, river and ocean current settings. Possible KHPS installations range from distributed generation arrangements in near-shore urban and village settings to base power generation at offshore deepwater locales.

159

The effect of efficient lighting on the environment: pilot project in Palestine  

Science Journals Connector (OSTI)

The global environment facility (GEF 1994...) has funded the Mexico high-efficiency project. The main goal of the project is to reduce greenhouse gas emissions as well as local environmental ... through the repla...

Naser Tibi; Ahmad Ramahi

2005-11-01T23:59:59.000Z

160

Estimating the Effects of Climate Change on Federal Hydropower and Power Marketing  

SciTech Connect (OSTI)

The U.S. Department of Energy is currently preparing an assessment of the effects of climate change on federal hydropower, as directed by Congress in Section 9505 of the Secure Water Act of 2009 (P.L. 111-11). This paper describes the assessment approach being used in a Report to Congress currently being prepared by Oak Ridge National Laboratory. The 9505 assessment will examine climate change effects on water available for hydropower operations and the future power supplies marketed from federal hydropower projects. It will also include recommendations from the Power Marketing Administrations (PMAs) on potential changes in operation or contracting practices that could address these effects and risks of climate change. Potential adaption and mitigation strategies will also be identified. Federal hydropower comprises approximately half of the U.S. hydropower portfolio. The results from the 9505 assessment will promote better understanding among federal dam owners/operators of the sensitivity of their facilities to water availability, and it will provide a basis for planning future actions that will enable adaptation to climate variability and change. The end-users of information are Congressional members, their staff, the PMAs and their customers, federal dam owners/operators, and the DOE Water Power Program.

Sale, Michael J [ORNL; Kao, Shih-Chieh [ORNL; Uria Martinez, Rocio [ORNL; Wei, Yaxing [ORNL

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

E-Print Network 3.0 - arctic pilot project Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the world." Mike Steele: "The Switchyard Project is designed... to better understand the ocean currents that are moving in the Arctic Ocean towards the North ... Source:...

162

Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing Cost-Effective Library Services and Resources for  

E-Print Network [OSTI]

: · Print collection analysis and management strategies · Re- Design of library facilities and space space for new library services and learning areas, and can reduce overall library expenditures. CourantPage 1 Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing

Su, Xiao

163

Hydropower and Ocean Energy Resources and Technologies | Department of  

Broader source: Energy.gov (indexed) [DOE]

Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies October 7, 2013 - 9:29am Addthis Photo of water flowing from several openings in a hydropower dam. Hydropower produces 10% of the nation's energy, including power from the Ice Harbor Dam in Burbank, Washington. This page provides a brief overview of hydropower and ocean energy resources and technologies supplemented by specific information to apply these technologies within the Federal sector. Overview Hydropower has been used for centuries to power machinery, but the application most commonly associated with hydropower is electricity production through dams. Ocean energy refers to various forms of renewable energy harnessed from the ocean. There are two primary types of ocean energy: mechanical and thermal.

164

1 INTRODUCTION High-head storage hydropower plants operate  

E-Print Network [OSTI]

1 INTRODUCTION High-head storage hydropower plants operate their turbines during periods of high Polytechnique Fédérale de Lausanne, 1015 Lausanne, Switzerland ABSTRACT: High-head storage hydropower plants

Floreano, Dario

165

Energy Department Making Hydropower More Eco-Friendly  

Office of Energy Efficiency and Renewable Energy (EERE)

Hydropower has long provided a flexible, low-cost, and renewable source of power for the United Statessince the 1800s, in fact. Even today, in fact, hydropower accounted for roughly half of the...

166

forreading. RECONCILING HYDROPOWER AND ENVIRONMENTAL WATER USES IN THE  

E-Print Network [OSTI]

O nly forreading. D o notD ow nload. RECONCILING HYDROPOWER AND ENVIRONMENTAL WATER USES Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan, Hubei, China conflicting uses, hydropower and environmental, using the Leishui River basin and Dongjiang reservoir

Pasternack, Gregory B.

167

Microsoft Word - PhycalAlgaePilotProject_NEPAFinalEA_October2011...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

technology for the reuse of carbon dioxide (CO 2 ) emissions from industrial sources for green energy products. This project would use CO 2 to grow algae for the production of...

168

Commonwealth Hydropower Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Commonwealth Hydropower Program Commonwealth Hydropower Program Commonwealth Hydropower Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit State Government Tribal Government Savings Category Water Buying & Making Electricity Home Weatherization Maximum Rebate Design and Construction: $600,000 Feasibility study: $40,000 Program Info Funding Source Massachusetts Renewable Energy Trust Start Date 09/2009 State Massachusetts Program Type State Grant Program Rebate Amount Design and Construction: 50% of costs or $1.00 per incremental kWh per year Feasibility study: 80% of costs Provider Massachusetts Clean Energy Center Note: This program reopened March 15, 2013. There is $1,200,000 available for Round 5; applications will be accepted on a rolling basis until funding

169

Voluntary Agreements for Increasing Energy-Efficiency in Industry: Case Study of a Pilot Project with the Steel Industry in Shandong Province, China  

SciTech Connect (OSTI)

This paper describes international experience with the use of Voluntary Agreements for increasing industrial sector energy-efficiency, drawing lessons learned regarding the essential elements of the more successful programs. The paper focuses on a pilot project for implementation of a Voluntary Agreement with two steel mills in Shandong Province that was developed through international collaboration with experts in China, the Netherlands, and the U.S. Designing the pilot project involved development of approaches for energy-efficiency potential assessments for the steel mills, target-setting to establish the Voluntary Agreement energy-efficiency goals, preparing energy-efficiency plans for implementation of energy-saving technologies and measures, and monitoring and evaluating the project's energy savings.

Price, Lynn; Worrell, Ernst; Sinton, Jonathan; Yun, Jiang

2003-03-01T23:59:59.000Z

170

SHRP 2 Project L38 Pilot Testing of Reliability Data and Analytical Products  

E-Print Network [OSTI]

Kickoff Apr 2013 Interim Update Oct 2013 Minnesota Workshop Feb 2014 Project Completion Jun 2014 Technical/22/2014 #12;Reliability ­ Results 155/22/2014 #12;Performance Measures Travel Time Index Travel Time Index is the ratio of the average observed travel time divided by the average free-flow travel time. Buffer Index

Minnesota, University of

171

Basic data report: borehole WIPP-12 deepening. Waste Isolation Pilot Plant (WIPP) Project, southeastern New Mexico  

SciTech Connect (OSTI)

Borehole WIPP-12 was originally drilled in 1978 as an exploratory borehole to characterize the geology of the Waste Isolation Pilot Plant (WIPP) site in Eddy County, New Mexico. WIPP-12 was reentered and deepened in late 1981. WIPP-12 is located in Section 17, T22S, R31E, just outside the limit of Zone II, approximately one mile north of the exploratory shaft site. The deepening of WIPP-12 was undertaken for several reasons: to investigate the presence of an anticlinal or domal structure and thickening of halite indicated by surface seismic reflection surveys conducted in the area; to determine the nature and extent of deformation in the Castile Formation, in a location adjacent to the zone of anomalous seismic reflections found north of the well location (''Disturbed Zone''); and to characterize any fluid-bearing zones encountered in the Castile Formation while drilling. Field operations related to deepening of the borehole began November 16, 1981 and were completed January 1, 1982. The borehole was deepened through the Castile Formation to a total depth of 3927.5 ft by coring. Pressurized brine was encountered on November 22, 1981 at a depth of about 3016 ft. The brine reservoir is apparently related to a system of near-vertical fractures of unknown extent observed in Anhydrite III. The Halite I member is about 200 ft thicker than observed in undisturbed areas in the vicinity of WIPP (for example, Borehole DOE-1). Small-scale lithologic features such as folding of anhydrite stringers in halite and halite lineation appear to confirm the presence of a structural disturbance at this location. This Basic Data Report includes geologic information gathered during WIPP-12 deepening.

Black, S.R.

1982-12-01T23:59:59.000Z

172

&#8220;Sustainable development of hydropower in third countries: The  

Broader source: Energy.gov (indexed) [DOE]

Sustainable development of hydropower in third countries: Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight against glo

173

Federal Memorandum of Understanding for Hydropower | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Memorandum of Understanding for Hydropower On March 24, 2010, the Department of the Army through the U.S. Army Corps of Engineers, the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to "help meet the nation's needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts." Additionally, the MOU aims to

174

Virtual Hydropower Prospector | Open Energy Information  

Open Energy Info (EERE)

Virtual Hydropower Prospector Virtual Hydropower Prospector Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Virtual Hydropower Prospector Agency/Company /Organization: Idaho National Laboratory Sector: Energy Topics: Resource assessment Resource Type: Software/modeling tools User Interface: Website Website: hydropower.inl.gov/prospector/index.shtml Country: United States Cost: Free Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

175

ZeaChem Pilot Project: High-Yield Hybrid Cellulosic Ethanol Process Using High-Impact Feedstock for Commercialization  

Broader source: Energy.gov [DOE]

This pilot-scale integrated biorefinery will produce 250,000 gallons per year of cellulosic ethanol when running at full operational status.

176

Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S.  

Broader source: Energy.gov [DOE]

Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S.

177

Hydropower Appropriations | Department of Energy  

Office of Environmental Management (EM)

Water Power for a Clean Energy Future (Fact Sheet), Wind and Water Power Program (WWPP) Marine and Hydrokinetic Energy Projects Water Power Program: 2011 Peer Review Report...

178

DISCOVERY OF A LOW-MASS COMPANION TO A METAL-RICH F STAR WITH THE MARVELS PILOT PROJECT  

SciTech Connect (OSTI)

We report the discovery of a low-mass companion orbiting the metal-rich, main sequence F star TYC 2949-00557-1 during the Multi-object APO Radial Velocity Exoplanet Large-area Survey (MARVELS) pilot project. The host star has an effective temperature T{sub eff} = 6135 {+-} 40 K, logg = 4.4 {+-} 0.1, and [Fe/H] = 0.32 {+-} 0.01, indicating a mass of M = 1.25 {+-} 0.09 M{sub sun} and R = 1.15 {+-} 0.15 R{sub sun}. The companion has an orbital period of 5.69449 {+-} 0.00023 days and straddles the hydrogen burning limit with a minimum mass of 64 M{sub J} , and thus may be an example of the rare class of brown dwarfs orbiting at distances comparable to those of 'Hot Jupiters'. We present relative photometry that demonstrates that the host star is photometrically stable at the few millimagnitude level on time scales of hours to years, and rules out transits for a companion of radius {approx}>0.8 R{sub J} at the 95% confidence level. Tidal analysis of the system suggests that the star and companion are likely in a double synchronous state where both rotational and orbital synchronization have been achieved. This is the first low-mass companion detected with a multi-object, dispersed, fixed-delay interferometer.

Fleming, Scott W.; Ge Jian; Mahadevan, Suvrath; Lee, Brian; Cuong Nguyen, Duy; Morehead, Robert C.; Wan Xiaoke; Zhao Bo; Liu Jian; Guo Pengcheng; Kane, Stephen R. [Department of Astronomy, University of Florida, 211 Bryant Space Science Center, Gainesville, FL 326711-2055 (United States); Eastman, Jason D.; Siverd, Robert J.; Scott Gaudi, B. [Department of Astronomy, Ohio State University, 140 West 18th Avenue, Columbus, OH 43210 (United States); Niedzielski, Andrzej [Torun Center for Astronomy, Nicolaus Copernicus University, ul. Gagarina 11, 87-100, Torun (Poland); Sivarani, Thirupathi [Indian Institute of Astrophysics, Bangalore 560034 (India); Stassun, Keivan G.; Gary, Bruce [Department of Physics and Astronomy, Vanderbilt University, Nashville, TN 37235 (United States); Wolszczan, Alex [Department of Astronomy and Astrophysics, The Pennsylvania State University, 525 Davey Laboratory, University Park, PA 16802 (United States); Barnes, Rory, E-mail: scfleming@astro.ufl.ed [Department of Astronomy, University of Washington, P.O. Box 351580, Seattle, WA 98195 (United States)

2010-08-01T23:59:59.000Z

179

Landscape Measures of Rangeland Condition in the BLM Owyhee Pilot Project: Shrub Canopy Mapping, Vegetation Classification, and Detection of Anomalous Land Areas  

SciTech Connect (OSTI)

In 2006, the BLM tasked PNNL to collaborate in research being conducted under the Owyhee Uplands Pilot Project to assess rangeland condition. The objective of this effort was to provide Owyhee Uplands Pilot Project with a sophisticated suite of data and tools to assist in evaluating the health and condition of the Owyhee Uplands study area. We focused on three technical areas. The first involved enhancing existing algorithms to estimate shrub canopy cover in the Lower Reynolds Creek Watershed. The second task involved developing and applying a strategy to assess and compare three vegetation map products for the Idaho portion of the Owyhee study area. The third task developed techniques and data that can be used to identify areas exhibiting anomalous rangeland conditions (for example exotic plants or excessive bare soil exposure). This report documents the methods used, results obtained, and conclusions drawn.

Tagestad, Jerry D.; Downs, Janelle L.

2007-12-28T23:59:59.000Z

180

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect (OSTI)

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

West Pearl Queen CO2 sequestration pilot test and modeling project 2006-2008.  

SciTech Connect (OSTI)

The West Pearl Queen is a depleted oil reservoir that has produced approximately 250,000 bbl of oil since 1984. Production had slowed prior to CO{sub 2} injection, but no previous secondary or tertiary recovery methods had been applied. The initial project involved reservoir characterization and field response to injection of CO{sub 2}; the field experiment consisted of injection, soak, and venting. For fifty days (December 20, 2002, to February 11, 2003) 2090 tons of CO{sub 2} were injected into the Shattuck Sandstone Member of the Queen Formation at the West Pearl Queen site. This technical report highlights the test results of the numerous research participants and technical areas from 2006-2008. This work included determination of lateral extents of the permeability units using outcrop observations, core results, and well logs. Pre- and post-injection 3D seismic data were acquired. To aid in interpreting seismic data, we performed numerical simulations of the effects of CO{sub 2} replacement of brine where the reservoir model was based upon correlation lengths established by the permeability studies. These numerical simulations are not intended to replicate field data, but to provide insight of the effects of CO{sub 2}.

Engler, Bruce Phillip; Cooper, Scott Patrick; Symons, Neill Phillip; Bartel, Lewis Clark; Byrer, Charles (National Energy Laboratory, Morgantown, WV); Elbring, Gregory Jay; McNemar, Andrea (National Energy Laboratory, Morgantown, WV); Aldridge, David Franklin; Lorenz, John Clay

2008-08-01T23:59:59.000Z

182

Paducah Gaseous Diffusion Plant proposed pilot pump-and-treat project. Final report  

SciTech Connect (OSTI)

On March 23, 1992, R.C. Sleeman of the Department of Energy, Oak Ridge Operations Office requested that a Groundwater Corrective Actions Team be assembled to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at the Paducah Gaseous Diffusion Plant. In addition to other suggestions, the Team recommended that further characterization data be obtained for the plume. In the Fall of 1993 additional, temporary well points were installed so that groundwater samples from the shallow groundwater system and the Regional Gravel Aquifer (RGA) could be obtained to provide a three-dimensional view of groundwater contamination in the region of the plume. The results indicate that pure-phase DNAPL (trichloroethylene [TCE]) probably are present in the source area of the plume and extend in depth to the base of the RGA. Because the DNAPL likely will represent a source of a dissolved phase plume for decades it is essential that source containment take place. The Team recommends that although effective hydraulic containment can be achieved, other alternatives should be considered. For example, recent advances in emplacing low permeability barrier walls to depths of 100 to 150 ft make it possible to consider encirclement of the source of the Northwest plume.

Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Huff, D.D.; Jones, K.S.; Nickelson, M.D.; Rightmire, C.T.

1994-01-01T23:59:59.000Z

183

Estimated impacts of climate warming on Californias high-elevation hydropower  

E-Print Network [OSTI]

on high elevation hydropower generation in CaliforniasCalifornias high-elevation hydropower Kaveh Madani Jay R.Abstract Californias hydropower system is composed of high

Madani, Kaveh; Lund, Jay R.

2010-01-01T23:59:59.000Z

184

Microsoft Word - FINAL 2013 Hydropower Meeting Agenda 060713  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Board Oklahoma Comprehensive Water Plan Update Others SOUTHWESTERN FEDERAL HYDROPOWER MEETING The Earl Cabell Federal Building 1100 Commerce Street Red River Room Floor...

185

2014 Water Power Program Peer Review Compiled Presentations: Hydropower Technologies  

Broader source: Energy.gov [DOE]

This document contains the compiled hydropower technologies presentations from the U.S. Department of Energy 2014 Water Power Program Peer Review, held February 25-27, 2014.

186

New Stream-Reach Hydropower Development Fact Sheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

for new hydropower development in U.S. stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure. New Stream-Reach Development...

187

Laboratory Demonstration of a New American Low-Head Hydropower...  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Demonstration of a New American Low-Head Hydropower Turbine 68bhydrogreensmallhydroch11.ppt More Documents & Publications Real World Demonstration of a New...

188

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia  

SciTech Connect (OSTI)

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

Pasha, MD Fayzul K [ORNL] [ORNL; Hadjerioua, Boualem [ORNL] [ORNL; Stewart, Kevin M [ORNL] [ORNL; Bender, Merlynn [Bureau of Reclamation] [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers] [U.S. Army Corps of Engineers

2012-01-01T23:59:59.000Z

189

Petrel: Data Management and Sharing Pilot | Argonne Leadership...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Cobalt Scheduler GLEAN Petrel Swift Petrel: Data Management and Sharing Pilot The Petrel Data Service pilot provides a mechanism for Argonne researchers and ALCF users to...

190

E-Print Network 3.0 - assessment hydropower evaluation Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

functional displays for hydropower systems: Model-based guidance of scenario design... Work Domain Analysis and Ecological Interface Design for Hydropower System Monitoring and...

191

Development of environmentally advanced hydropower turbine system design concepts  

SciTech Connect (OSTI)

A team worked together on the development of environmentally advanced hydro turbine design concepts to reduce hydropower`s impact on the environment, and to improve the understanding of the technical and environmental issues involved, in particular, with fish survival as a result of their passage through hydro power sites. This approach brought together a turbine design and manufacturing company, biologists, a utility, a consulting engineering firm and a university research facility, in order to benefit from the synergy of diverse disciplines. Through a combination of advanced technology and engineering analyses, innovative design concepts adaptable to both new and existing hydro facilities were developed and are presented. The project was divided into 4 tasks. Task 1 investigated a broad range of environmental issues and how the issues differed throughout the country. Task 2 addressed fish physiology and turbine physics. Task 3 investigated individual design elements needed for the refinement of the three concept families defined in Task 1. Advanced numerical tools for flow simulation in turbines are used to quantify characteristics of flow and pressure fields within turbine water passageways. The issues associated with dissolved oxygen enhancement using turbine aeration are presented. The state of the art and recent advancements of this technology are reviewed. Key elements for applying turbine aeration to improve aquatic habitat are discussed and a review of the procedures for testing of aerating turbines is presented. In Task 4, the results of the Tasks were assembled into three families of design concepts to address the most significant issues defined in Task 1. The results of the work conclude that significant improvements in fish passage survival are achievable.

Franke, G.F.; Webb, D.R.; Fisher, R.K. Jr. [Voith Hydro, Inc. (United States)] [and others

1997-08-01T23:59:59.000Z

192

Editorial: Time for green certification for all hydropower?  

SciTech Connect (OSTI)

While accrediting a large hydropower facility is intrinsically more complex and potentially controversial, it is time to review the progress made in understanding the environmental impacts of large hydropower and the development of environmentally friendly hydropower systems. Over the last two decades, many in-field, laboratory, and modeling technologies have been developed or improved to better understand the mechanisms of fish injury and mortality and to identify turbine design and operation alternatives to reduce such impacts. In 2010, representatives of DOE and the US Department of Interior, and USACE signed a memorandum of understanding to work more closely to develop sustainable hydropower. One of their major objectives is to increase hydropower generation using low-impact and environmentally sustainable approaches. Given the recent scientific and technological advances that have decreased the environmental impact of hydropower and the need to aggressively facilitate development of low impact hydropower, we think it is indeed time to initiate a science-based green certification program that includes rigorous criteria for environmental protection but does not exclude hydropower based on size only.

Deng, Zhiqun; Carlson, Thomas J.

2012-04-10T23:59:59.000Z

193

Property:PotentialHydropowerGeneration | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerGeneration PotentialHydropowerGeneration Jump to: navigation, search Property Name PotentialHydropowerGeneration Property Type Quantity Description The estimated potential energy generation from Hydropower for a particular place. Use this type to express a quantity of energy. The default unit for energy on OpenEI is the Kilowatt hour (kWh), which is 3,600,000 Joules. http://en.wikipedia.org/wiki/Unit_of_energy It's possible types are Watt hours - 1000 Wh, Watt hour, Watthour Kilowatt hours - 1 kWh, Kilowatt hour, Kilowatthour Megawatt hours - 0.001 MWh, Megawatt hour, Megawatthour Gigawatt hours - 0.000001 GWh, Gigawatt hour, Gigawatthour Joules - 3600000 J, Joules, joules Pages using the property "PotentialHydropowerGeneration" Showing 25 pages using this property. (previous 25) (next 25)

194

Property:PotentialHydropowerSites | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerSites PotentialHydropowerSites Jump to: navigation, search Property Name PotentialHydropowerSites Property Type Number Description The number of potential hydropower sites in a place. Pages using the property "PotentialHydropowerSites" Showing 25 pages using this property. (previous 25) (next 25) A Alabama + 2,435 + Alaska + 3,053 + Arizona + 1,958 + Arkansas + 3,268 + C California + 9,692 + Colorado + 5,060 + Connecticut + 659 + D Delaware + 25 + F Florida + 493 + G Georgia + 2,100 + H Hawaii + 437 + I Idaho + 6,706 + Illinois + 1,330 + Indiana + 1,142 + Iowa + 2,398 + K Kansas + 3,201 + Kentucky + 1,394 + L Louisiana + 934 + M Maine + 1,373 + Maryland + 491 + Massachusetts + 560 + Michigan + 1,942 + Minnesota + 1,391 + Mississippi + 1,536 + Missouri + 5,089 +

195

The Next Generation of Hydropower Engineers and Scientists | Department of  

Broader source: Energy.gov (indexed) [DOE]

The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Mike Reed Water Power Program Manager, Water Power Program As the nation continues to rely on hydropower to help meet its energy needs, a new generation of engineers and scientists is finding ways to make hydropower technologies more efficient, environmentally friendly and cost effective. The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE), in cooperation with the Hydro Research

196

U.S. hydropower resource assessment for Ohio  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Ohio.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

197

U.S. hydropower resource assessment for North Carolina  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of North Carolina.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

198

U.S. hydropower resource assessment for Idaho  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.

Conner, A.M.; Francfort, J.E.

1998-08-01T23:59:59.000Z

199

U.S. hydropower resource assessment for Nevada  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nevada.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

200

RECIPIENT:Phillips County u.s DEPARTl\IENT OF ENERGY EERE PROJECT MANAG  

Broader source: Energy.gov (indexed) [DOE]

Phillips County Phillips County u.s DEPARTl\IENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETE~IINATION PROJECT TITLE: CRED * Phillips County 30MW Wind Project Page 1 of2 STATE: CO Funding Opportunity Announcement NUffiMr DE-FOA-OCJ0122 Procurtmtnt Instrument Number DE-EEOOO3073 NEPA Control Number CID Numbn o Based on my rev iew of the information ('oncuoing the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I bave made the following determination:. ex. EA, EIS APPENDIX AND NUMBER: Description: C12 Siting, construction , and operation of energy system prototypes including , but not limited to, wind resource, hydropower, geothermal , fossil fuel , biomass, and solar energy pilot projects. A9 Information gathering (including

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

GHG Emissions from Hydropower Reservoirs The role of hydropower reservoirs in contributing to greenhouse gas (GHG) emissions is poorly  

E-Print Network [OSTI]

GHG Emissions from Hydropower Reservoirs The role of hydropower reservoirs in contributing to greenhouse gas (GHG) emissions is poorly understood, but recent studies have indicated that GHG emissions; and over 5 weeks in August--September, the peak GHG emission period, during 2012. (Pacific Northwest

202

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 2 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the second cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

203

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 1 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the first cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

204

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 3 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the third cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

205

Low Head/Low Power Hydropower Resource Assessment of the Pacific Northwest Hydrologic Region  

E-Print Network [OSTI]

three classes of hydropower technologies: conventional turbines, unconventional systems, and microhydro

Power Hydropower; Douglas G. Hall; Gregory R. Carroll; Shane J. Cherry; Y D. Lee; Garold L. Sommers

2002-01-01T23:59:59.000Z

206

Sustainable Reservoir Operation: Can we Generate Hydropower and Preserve Ecosystem Values?  

SciTech Connect (OSTI)

Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generations while satisfying legal requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modeling with models that predict ecosystem responses to flow.

Jager, Yetta [ORNL; Smith, Brennan T [ORNL

2008-01-01T23:59:59.000Z

207

Federal Memorandum of Understanding for Hydropower/Participating Agencies |  

Open Energy Info (EERE)

Participating Agencies Participating Agencies < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Bonneville Power Administration: caption:Bonneville Power Administration Bonneville Power Administration Factsheet Bonneville Power Administration Publications Conservation Resource Energy Data - The Red Book Bureau of Indian Affairs: caption:Bureau of Indian Affairs Bureau of Indian Affairs Factsheet Tribal Energy and Environmental Clearinghouse (TEEIC) Office of Indian Energy and Economic Development (IEED) Division of Irrigation, Power and Safety of Dams Bureau of Reclamation: caption:Bureau of Reclamation Factsheet

208

Solar Energy and Small Hydropower Tax Credit (Personal) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Personal Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

209

Property:PotentialHydropowerCapacity | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerCapacity PotentialHydropowerCapacity Jump to: navigation, search Property Name PotentialHydropowerCapacity Property Type Quantity Description The nameplate capacity technical potential from Hydropower for a particular place. Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

210

Solar Energy and Small Hydropower Tax Credit (Corporate) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Corporate Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

211

New Hydropower Turbines to Save Snake River Steelhead | Department of  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Turbines to Save Snake River Steelhead Hydropower Turbines to Save Snake River Steelhead New Hydropower Turbines to Save Snake River Steelhead May 24, 2010 - 1:23pm Addthis Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Joshua DeLung Hydropower harnesses water power to create reliable, clean and plentiful renewable energy, but dams can have an unintended impact on wildlife --

212

NREL: Energy Analysis - Hydropower Results - Life Cycle Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the systematic review and analysis. The majority of life cycle greenhouse gas (GHG) emission estimates for hydropower cluster between about 4 and 14 g CO2eqkWh. The...

213

A New Vision for United States Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vision has not only breadth, but depth in its approach to the future of this vital renewable energy industry. To aid in this process, Hydropower Vision Task Forces are being...

214

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project  

SciTech Connect (OSTI)

This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

Not Available

1992-12-29T23:59:59.000Z

215

Memorandum of Understanding for Hydropower Two Year Progress Report  

Broader source: Energy.gov [DOE]

On March 24, 2010, the Department of the Army (DOA) through the U.S. Army Corps of Engineers (USACE or Corps), the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to help meet the nations needs for reliable, affordable, and environmentally sustainable hydropower by building a long

216

Pilot-scale Limestone Emission Control (LEC) process: A development project. Volume 1, Main report and appendices A, B, C, and D: Final report  

SciTech Connect (OSTI)

ETS, Inc., a pollution consulting firm with headquarters in Roanoke, Virginia, has developed a dry, limestone-based flue gas desulfurization (FGD) system. This SO{sub 2} removal system, called Limestone Emission Control (LEC), can be designed for installation on either new or existing coal-fired boilers. In the LEC process, the SO{sub 2} in the flue gas reacts with wetted granular limestone that is contained in a moving bed. A surface layer of principally calcium sulfate (CaSO{sub 4}) is formed on the limestone. Periodic removal of this surface layer by mechanical agitation allows high utilization of the limestone granules. A nominal 5,000 acfm LEC pilot plant has been designed, fabricated and installed on the slipstream of a 70,000 pph stoker boiler providing steam to Ohio University`s Athens, Ohio campus. A total of over 90 experimental trials have been performed using the pilot-scale moving-bed LEC dry scrubber as a part of this research project with run times ranging up to a high of 125 hours. SO{sub 2} removal efficiencies as high as 99.9% were achievable for all experimental conditions studied during which sufficient humidification was added to the LEC bed. The LEC process and conventional limestone scrubbing have been compared on an equatable basis using flue gas conditions that would be expected at the outlet of the electrostatic precipitator (ESP) of a 500 MW coal-fired power plant. The LEC was found to have a definite economic advantage in both direct capital costs and operating costs. Based on the success and findings of the present project, the next step in LEC process development will be a full-scale commercial demonstration unit.

Prudich, M.E. [Ohio Univ., Athens, OH (United States); Appell, K.W.; McKenna, J.D. [ETS, Inc., Roanoke, VA (United States)

1994-03-01T23:59:59.000Z

217

Identification and analysis of functional elements in 1% of the human genome by the ENCODE pilot project  

Science Journals Connector (OSTI)

... project: G. Weinstock, M. Cherry, G. Churchill, M. Eisen, S. Elgin, J. Lis, J. Rine, M. Vidal and P. Zamore. Reprints and ...

2007-06-14T23:59:59.000Z

218

Conventional Hydropower Technologies (Fact Sheet), Wind And Water Power Program (WWPP)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water Power Water Power Program supports the development of technologies that harness the nation's renewable hydropower resources to generate environmentally sustainable and cost-effective electricity. Most conventional hydropower plants use a diver- sion structure, such as a dam, to capture water's potential energy via a turbine for electricity generation. The program's conventional hydropower activities focus on increasing generating capacity and efficiency at existing hydroelectric facilities, adding hydroelectric generating capacity to exist- ing non-powered dams, adding new low impact hydropower, increasing advanced pumped-storage hydropower capacity, and reducing potential environmental impacts of conven- tional hydropower production. The program's research and

219

US DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEI'ER1IllNATION  

Broader source: Energy.gov (indexed) [DOE]

DEI'ER1IllNATION DEI'ER1IllNATION Page I of3 RECIPIENT:Verdant Power, Inc. STATE: NY PROJECT TITLE : Advancement of the Kinetic Hydropower System (KHPS) to DOE TRL 7/8 Funding Opportunity Announcement Number DE-FOA-OOOO293 Procurement Instrument Number NEPA Control Number CID Number DE-EEOOO5929 GF0-0005929-OO1 EE5929 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APP .. :NDlX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination 83.6 S mall-scale research and development, laboratory o peratio ns, and pilot projects 83.16 Researc h activities in aquatic env ironments Information gathering (induding, but not limited to, literature surveys, inventories, site visits, and audits),

220

u.s. DEPARTMENT OF ENERG Y EERE PROJECT MANAG EMENT CENTER NEPA DETERrlIINATION  

Broader source: Energy.gov (indexed) [DOE]

MANAG MANAG EMENT CENTER NEPA DETERrlIINATION RECIPIENT:Surprise Valley Electric Corporation PROJECT TITLE: Rural Cooperative Geothermal Development Electric & Agriculture Page 1 of3 STATE: OR Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-00OO109 DE-EEOOO3006 GFO-10-344 G03006 Based on my revirw oftbe information concerning the propost~ d action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I han made the following ddermination: CX, EA. tiS APPENDIX AND NUMBER: Description: C12 Siting, construction, and operation of energy system prototypes including, but not limited to, wind resource, hydropower, geothermal, fossil fuel, biomass, and solar energy pilot projects.

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Real World Demonstration of a New American Low-Head Hydropower...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Real World Demonstration of a New American Low-Head Hydropower Unit Real World Demonstration of a New American Low-Head Hydropower Unit Real World Demonstration of a New American...

222

Los Alamos County Completes Abiquiu Hydropower Project, Bringing...  

Office of Environmental Management (EM)

installed by the Los Alamos County Department of Public Utilities at the Abiquiu Hydroelectric Facility on the Rio Chama River in New Mexico. DOE's Wind and Water Power Program...

223

President Obama Signs Two Bills to Boost Small Hydropower Projects...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Manufacturing Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Water Power Program About the Program Research &...

224

Vulnerability of Hydropower Projects to Climate Change Revision: 20th  

E-Print Network [OSTI]

will be significant and far-reaching. Plans to control the rise in greenhouse gas concentrations have been put forward [3]: these aim to cut or stabilise emissions relative to 1990 levels, but to achieve the targets, the energy sector will have to change. Proposals include reducing reliance on fossil fuels, using more

Harrison, Gareth

225

Quantifying the Value of Hydropower in the Electric Grid: Final Report  

Broader source: Energy.gov [DOE]

This report summarizes a 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. The study looked at existing large hydropower operations in the U.S., models for different electricity futures, markets, costs of existing and new technologies as well as trends related to hydropower investments in other parts of the world.

226

Analysing Climate Change Risk in Hydropower Development By Gareth P. Harrison and Bert W. Whittington,  

E-Print Network [OSTI]

1 Analysing Climate Change Risk in Hydropower Development By Gareth P. Harrison and Bert W ABSTRACT The continuing and increased use of hydropower is a key part of the strategy to limit the extent a methodology for quantifying the potential impact of climate change on the financial performance of hydropower

Harrison, Gareth

227

Modeling Multi-Reservoir Hydropower Systems in the Sierra Nevada with Environmental Requirements and Climate Warming  

E-Print Network [OSTI]

i Modeling Multi-Reservoir Hydropower Systems in the Sierra Nevada with Environmental Requirements and the Sierra Nevada, their majestic backyard. #12;iii Abstract Hydropower systems and other river regulation that ecosystems have historically depended on. These effects are compounded at regional scales. As hydropower

Lund, Jay R.

228

SUMMARY OF HYDROPOWER COSTS APPENDIX B FISH AND WILDLIFE PROGRAM B-1 December 15, 1994  

E-Print Network [OSTI]

SUMMARY OF HYDROPOWER COSTS APPENDIX B FISH AND WILDLIFE PROGRAM B-1 December 15, 1994 Appendix B SUMMARY OF HYDROPOWER COSTS AND IMPACTS OF THE MAINSTEM PASSAGE ACTIONS This document summarizes regional hydropower costs and impacts of the mainstem passage actions in the Northwest Power Planning Council's 1994

229

HYDROPOWER RESERVOIR FOR FLOOD CONTROL: A CASE STUDY ON RINGLET RESERVOIR, CAMERON  

E-Print Network [OSTI]

HYDROPOWER RESERVOIR FOR FLOOD CONTROL: A CASE STUDY ON RINGLET RESERVOIR, CAMERON HIGHLANDS, Malaysia 4 Professor, Department of Civil Engineering, Colorado State University, USA ABSTRACT: Hydropower as possible for daily hydropower generation as well as to prevent any spillage at dam. However

Julien, Pierre Y.

230

Climate Change Effects on High-Elevation Hydropower System in KAVEH MADANI LARIJANI  

E-Print Network [OSTI]

i Climate Change Effects on High-Elevation Hydropower System in California By KAVEH MADANI LARIJANI ___________________________________________ Committee in Charge 2009 #12;ii Abstract The high-elevation hydropower system in California, composed of more than 150 hydropower plants and regulated by the Federal Energy Regulatory Commission (FERC

Lund, Jay R.

231

SUSTAINABLE RESERVOIR OPERATION: CAN WE GENERATE HYDROPOWER AND PRESERVE ECOSYSTEM VALUES?y  

E-Print Network [OSTI]

SUSTAINABLE RESERVOIR OPERATION: CAN WE GENERATE HYDROPOWER AND PRESERVE ECOSYSTEM VALUES hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legal

Jager, Henriette I.

232

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

233

Instream Flow Project  

Broader source: Energy.gov [DOE]

As a part of the Department of Energys Water Power Program, the Instream Flow Project was carried out by Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Argonne National Laboratory to develop tools aimed at defining environmental flow needs for hydropower operations.

234

The Invisible Dutch a Pilot Study Evaluating Dutch  

E-Print Network [OSTI]

The Invisible Dutch a Pilot Study Evaluating Dutch Migrants' Path to New Zealand from 1996 to 2006 in Christchurch, New Zealand and have been working on the research project The Invisible Dutch ­ a Pilot Study

Hickman, Mark

235

Effects of Climate Change on Federal Hydropower (Report to Congress)  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities

236

New Small Hydropower Technology to be Deployed in the United States  

SciTech Connect (OSTI)

Earth By Design Inc, (EBD), in collaboration with Oak Ridge National Laboratory (ORNL), Knight Pi sold and Co., and CleanPower AS, has responded to a Funding Opportunity Announcement (FOA) published by the Department of Energy (DOE) in April 2011. EBD submitted a proposal to install an innovative, small hydropower technology, the Turbinator, a Norwegian technology from CleanPower. The Turbinator combines an axial flow, fixed-blade Kaplan turbine and generator in a compact and sealed machine. This makes it a very simple and easy technology to be deployed and installed. DOE has awarded funding for this two-year project that will be implemented in Culver, Oregon. ORNL with the collaboration of CleanPower, will assess and evaluate the technology before and during the manufacturing phase and produce a full report to DOE. The goal of this phase-one report is to provide DOE Head Quarters (HQ), water power program management, a report with findings about the performance, readiness, capability, strengths and weakness, limitation of the technology, and potential full-scale deployment and application in the United States. Because of the importance of this information to the conventional hydropower industry and regulators, preliminary results will rapidly be distributed in the form of conference presentations, ORNL/DOE technical reports (publically available online, and publications in the peer-reviewed, scientific literature. These reports will emphasize the relevance of the activities carried out over the two-year study (i.e., performance, robustness, capabilities, reliability, and cost of the Turbinator). A final report will be submitted to a peer-reviewed publication that conveys the experimental findings and discusses their implications for the Turbinator application and implementation. Phase-two of the project consists of deployment, construction, and project operations. A detailed report on assessment and the performance of the project will be presented and communicated to DOE and published by ORNL.

Hadjerioua, Boualem [ORNL; Opsahl, Egil [CleanPower AS; Gordon, Jim [Earth By Design Inc., EBD; Bishop, Norm [Knigth Piesold Co.

2012-01-01T23:59:59.000Z

237

Hydropower Technology Development | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

traditional designs. One such project is the Alden Turbine, which is designed to reduce fish mortality while generating at efficiencies equal to or better than conventional Francis...

238

ECLIPSING BINARY SCIENCE VIA THE MERGING OF TRANSIT AND DOPPLER EXOPLANET SURVEY DATA-A CASE STUDY WITH THE MARVELS PILOT PROJECT AND SuperWASP  

SciTech Connect (OSTI)

Exoplanet transit and Doppler surveys discover many binary stars during their operation that can be used to conduct a variety of ancillary science. Specifically, eclipsing binary stars can be used to study the stellar mass-radius relationship and to test predictions of theoretical stellar evolution models. By cross-referencing 24 binary stars found in the MARVELS Pilot Project with SuperWASP photometry, we find two new eclipsing binaries, TYC 0272-00458-1 and TYC 1422-01328-1, which we use as case studies to develop a general approach to eclipsing binaries in survey data. TYC 0272-00458-1 is a single-lined spectroscopic binary for which we calculate a mass of the secondary and radii for both components using reasonable constraints on the primary mass through several different techniques. For a primary mass of M{sub 1} = 0.92 {+-} 0.1 M{sub sun}, we find M{sub 2} = 0.610 {+-} 0.036 M{sub sun}, R{sub 1} = 0.932 {+-} 0.076 R{sub sun}, and R{sub 2} = 0.559 {+-} 0.102 R{sub sun}, and find that both stars have masses and radii consistent with model predictions. TYC 1422-01328-1 is a triple-component system for which we can directly measure the masses and radii of the eclipsing pair. We find that the eclipsing pair consists of an evolved primary star (M{sub 1} = 1.163 {+-} 0.034 M{sub sun}, R{sub 1} = 2.063 {+-} 0.058 R{sub sun}) and a G-type dwarf secondary (M{sub 2} = 0.905 {+-} 0.067 M{sub sun}, R{sub 2} = 0.887 {+-} 0.037 R{sub sun}). We provide the framework necessary to apply this analysis to much larger data sets.

Fleming, Scott W.; Ge Jian; De Lee, Nathan M.; Zhao Bo; Wan Xiaoke; Guo Pengcheng [Department of Astronomy, University of Florida, Gainesville, FL 32611 (United States); Maxted, Pierre F. L.; Anderson, David R.; Hellier, Coel [Astrophysics Group, Keele University, Staffordshire, ST5 5BG (United Kingdom); Hebb, Leslie; Stassun, Keivan G.; Cargile, Phillip A.; Gary, Bruce [Department of Physics and Astronomy, Vanderbilt University, Nashville, TN 37235 (United States); Ghezzi, Luan [Observatorio Nacional, 20921-400 Sao Cristovao, Rio de Janeiro, RJ (Brazil); Wisniewski, John [Department of Astronomy, University of Washington, Seattle, WA 98195 (United States); Porto de Mello, G. F.; Ferreira, Leticia [Laboratorio Interinstitucional de e-Astronomia-LIneA, RJ 20921-400, Rio de Janeiro (Brazil); West, Richard G. [Department of Physics and Astronomy, University of Leicester, Leicester, LE1 7RH (United Kingdom); Mahadevan, Suvrath [Department of Astronomy and Astrophysics, Pennsylvania State University, University Park, PA 16802 (United States); Pollacco, Don, E-mail: scfleming@astro.ufl.edu [Astrophysics Research Centre, School of Mathematics and Physics, Queen's University, University Road, Belfast, BT7 1NN (United Kingdom)

2011-08-15T23:59:59.000Z

239

Hydropower Modernization Initiative Proposed Implementation Strategy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ES-5: Risk Reduction for 20-year Plan 0 2 4 6 8 10 12 14 16 18 20 Exciters Governors Transformer Design On-going Projects million Scenario 1 Scenario 2 Scenario 3 ES-5 A key...

240

Hydropower Potential in the Western U.S. | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydropower Potential in the Western U.S. Hydropower Potential in the Western U.S. Energy Data Apps Maps Challenges Resources Blogs Let's Talk Energy Beta You are here Data.gov » Communities » Energy » Data Hydropower Potential in the Western U.S. Dataset Summary Description The dataset includes design elements, installed capacity, production capability, associated costs and cost -to-benefit ratios for nearly 200 water storing and conveying structures currently maintained by the Bureau of Reclamation. These data were used to support the internal study and report for assessing hydropower capability at 70 of Reclamation's existing facilities where hydropower has not been developed. The dataset can further be leveraged to support applications designed to provide a better understanding of our hydropower production potential and resource utilization.

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Top 10 Things You Didn't Know about Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

about Hydropower about Hydropower Top 10 Things You Didn't Know about Hydropower April 19, 2013 - 3:49pm Addthis Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. | Video by the Energy Department. Mike Reed Water Power Program Manager, Water Power Program LEARN MORE Stay up to date on hydropower, marine and hydrokinetic energy technologies by visiting energy.gov/water. This article is part of the Energy.gov series highlighting the "Top Things You Didn't Know About..." Be sure to check back for more entries soon. 10. Hydropower is one of the oldest power sources on the planet, generating power when flowing water spins a wheel or turbine. It was used by farmers as far back as ancient Greece for mechanical tasks like grinding grain.

242

Top 10 Things You Didn't Know about Hydropower | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Top 10 Things You Didn't Know about Hydropower Top 10 Things You Didn't Know about Hydropower Top 10 Things You Didn't Know about Hydropower April 19, 2013 - 3:49pm Addthis Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. | Video by the Energy Department. Mike Reed Water Power Program Manager, Water Power Program LEARN MORE Stay up to date on hydropower, marine and hydrokinetic energy technologies by visiting energy.gov/water. This article is part of the Energy.gov series highlighting the "Top Things You Didn't Know About..." Be sure to check back for more entries soon. 10. Hydropower is one of the oldest power sources on the planet, generating power when flowing water spins a wheel or turbine. It was used by farmers as far back as ancient Greece for mechanical tasks like grinding grain.

243

Hydropower Potential Studies Reviewed for Scoping Study  

E-Print Network [OSTI]

Feasibility Study on Five Potential Hydroelectric Power Generation Locations, North Unit Irrigation District B/ENERGY STORAGE PROJECTS C1 Assessment of Opportunities for New US Pumped Storage Hydroelectric Plants Using Hydroelectric Pumped Storage for Enabling Variable Energy Resources within the FCRPS C4 Technical Analysis

244

Conventional Hydropower Technologies, Wind And Water Power Program (WWPP) (Fact Sheet)  

Broader source: Energy.gov [DOE]

The US Department of Energy conducts research on conventional hydropower technologies to increase generation and improve existing means of generating hydroelectricity.

245

Characteristics of the design of the hydropower equipment of the purnari-II hydroelectric station  

Science Journals Connector (OSTI)

1. The experience of design works on the hydropower equipment of a hydrostation as large of a large number of su...

V. A. Linyuchev

1998-03-01T23:59:59.000Z

246

Energy Department Announces $4.4 Million to Support Next-Generation Advanced Hydropower Manufacturing  

Office of Energy Efficiency and Renewable Energy (EERE)

The Energy Department today announced $4.4 million to support the application of advanced materials and manufacturing techniques to the development of next-generation hydropower technologies.

247

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network [OSTI]

........................................................................................11 3. Energy Efficiency Impacts..........................................................................................11 III. Organizational Structure........................................................................................................12 A. Organizational Overview

248

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network [OSTI]

Geothermal, Solid Fuel Biomass, Land Fill Gas Biomass, and Concentrating Solar Power. b) The cost, including return on investment. Market price of renewable energy equal to maximum of cost or market price of system energy d) The cost of wind energy assumes no extension of the production tax credit. e) Wind

249

H Foundation Pilot Project Awards  

E-Print Network [OSTI]

chemistry, molecular modeling, and small-molecule purification. These capabilities include hit evaluation; assay validation with small scale screen of selected chemical or biological library members · Large facility offers automated liquid handling down to nanoliter volumes, access to 70,000 small molecules

250

Independent Activity Report, Waste Isolation Pilot Plant - September...  

Broader source: Energy.gov (indexed) [DOE]

Diffusion Plant - July 2011 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 Independent Activity Report, West Valley Demonstration Project - November 2011...

251

Building America Whole-House Solutions for Existing Homes: Pilot...  

Broader source: Energy.gov (indexed) [DOE]

Florida Homes - Central and South Florida (Fact Sheet) In this pilot project, the Florida Solar Energy Center and Florida Power and Light are collaborating to retrofit a large...

252

APPLICATION OF CYCLIC CO2 METHODS IN AN OVER-MATURE MISICBLE CO2 PILOT PROJECT-WEST MALLALIEU FIELD, LINCOLN COUNTY, MS  

SciTech Connect (OSTI)

This progress report summarizes the results of a miscible cyclic CO{sub 2} project conducted at West Mallalieu Field Unit (WMU) Lincoln County, MS by J.P. Oil Company, Inc. Lafayette, LA. Information is presented regarding the verification of the mechanical integrity of the present candidate well, WMU 17-2B, to the exclusion of nearby more desirable wells from a reservoir standpoint. Engineering summaries of both the injection and flow back phases of the cyclic process are presented. The results indicate that the target volume of 63 MMCF of CO{sub 2} was injected into the candidate well during the month of August 2000 and a combined 73 MMCF of CO{sub 2} and formation gas were recovered during September, October, and November 2000. The fact that all of the injected CO{sub 2} was recovered is encouraging; however, only negligible volumes of liquid were produced with the gas. A number of different factors are explored in this report to explain the lack of economic success. These are divided into several groupings and include: Reservoir Factors, Process Factors, Mechanical Factors, and Special Circumstances Factors. It is impossible to understand precisely the one or combination of interrelated factors responsible for the failure of the experiment but I feel that the original reservoir quality concerns for the subject well WMU 17-2B were not surmountable. Based on the inferences made as to possible failure mechanisms, two future test candidates were selected, WMU 17-10 and 17-14. These lie a significant distance south of the WMU Pilot area and each have a much thicker and higher quality reservoir section than does WMU 17-2B. Both of these wells were productive on pumping units in the not too distant past. This was primary production not influenced by the distant CO{sub 2} injection. These wells are currently completed within somewhat isolated reservoir channels in the Lower Tuscaloosa ''A'' and ''B-2'' Sands that overlie the much more continuous and much larger Lower Tuscaloosa ''C'' Sand reservoir. The current proposal is to not only cycle the Lower Tuscaloosa ''C'' Sand in these wells but to also test the process on these discontinuous ''A'' and ''B-2'' reservoir pools to determine if miscible cyclic processes are applicable where continuous CO{sub 2} operations are not feasible.

Boyd Stevens Getz

2001-09-01T23:59:59.000Z

253

Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report  

SciTech Connect (OSTI)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energyâ??s Wind and Hydropower Technologies Programâ??s goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

Craig W. Collar

2012-11-16T23:59:59.000Z

254

Environmental Mitigation Technology (Innovative System Testing)-Deployment and Testing of the Alden Hydropower Fish-Friendly Turbine  

Broader source: Energy.gov [DOE]

Environmental Mitigation Technology (Innovative System Testing)-Deployment and Testing of the Alden Hydropower Fish-Friendly Turbine

255

Representing Energy Price Variability in Long-and Medium-term Hydropower Optimization  

E-Print Network [OSTI]

, 2002). The output of each hydropower plant is usually small relative to the overall energy market1 Representing Energy Price Variability in Long- and Medium- term Hydropower Optimization Marcelo A Department of Civil and Environmental Engineering, University of California, Davis, USA Journal of Water

Pasternack, Gregory B.

256

Prospects for Combining Energy and Environmental Objectives in Hydropower Optimization Brennan T. Smith and Henriette I. Jager  

E-Print Network [OSTI]

1 Prospects for Combining Energy and Environmental Objectives in Hydropower Optimization Brennan T, we review studies that derived rules for hydropower operation by solving optimization problems driven be compatible with hydropower optimization. Given the increasing value placed on the ecological sustainability

Jager, Henriette I.

257

Micro-hydropower: status and prospects IT Power Limited, The Manor House, Chineham Court, Luytens Close, Chineham, Hants, UK  

E-Print Network [OSTI]

, Luytens Close, Chineham, Hants, UK Abstract: Hydropower on a small scale, or micro-hydro, is one productivity and lifetime. Hydropower on a small-scale, or micro-hydro, is the exploitation of a river's hydro. 1.1 Small-scale hydro Hydropower has various degrees of `smallness'. To date there is still

Kammen, Daniel M.

258

Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development  

Open Energy Info (EERE)

Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Jump to: navigation, search Logo: Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Name Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Partner on behalf of Bundesministerium für Wirtschaftliche Zusammenarbeit und Entwicklung (BMZ); Directorate General for International Cooperation (DGIS Niederlande) Sector Energy Topics Background analysis Website http://www.gtz.de/en/themen/16 Program Start 1999 Program End 2008 Country Indonesia UN Region South-Eastern Asia References Mini-Hydropower Schemes for Sustainable Economic Development[1]

259

Chile-World Bank Climate Projects | Open Energy Information  

Open Energy Info (EERE)

World Bank Climate Projects World Bank Climate Projects Jump to: navigation, search Name Chile-World Bank Climate Projects Agency/Company /Organization World Bank Sector Energy Topics Background analysis Resource Type Dataset Country Chile South America References World Bank Project Database - Chile[1] Contents 1 World Bank Active Climate Projects in Chile 1.1 CL Securitization and Carbon Sinks Project 1.2 Chile Santiago Composting Project 1.3 Chile Quilleco Hydropower Project 1.4 Chile Hornitos Project (Chacabuquito II) 1.5 Sustainable Transport and Air Quality for Santiago (GEF) 1.6 Chile Sustainable Land Management Project 2 References World Bank Active Climate Projects in Chile CL Securitization and Carbon Sinks Project Chile Santiago Composting Project Chile Quilleco Hydropower Project

260

Microbial field pilot study  

SciTech Connect (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year`s report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Microbial field pilot study  

SciTech Connect (OSTI)

The objective of this project is to perform a microbial enhanced oil recovery field pilot in the Southeast Vassar Vertz Sand Unit (SEVVSU) in Payne County, Oklahoma. Indigenous, anaerobic, nitrate reducing bacteria will be stimulated to selectively plug flow paths which have been referentially swept by a prior waterflood. This will force future flood water to invade bypassed regions of the reservoir and increase sweep efficiency. This report covers progress made during the second year, January 1, 1990 to December 31, 1990, of the Microbial Field Pilot Study project. Information on reservoir ecology, surface facilities design, operation of the unit, core experiments, modeling of microbial processes, and reservoir characterization and simulation are presented in the report. To better understand the ecology of the target reservoir, additional analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. The results of the produced and injected water analysis show increasing sulfide concentrations with respect to time. In March of 1990 Mesa Limited Partnership sold their interest in the SEVVSU to Sullivan and Company. In April, Sullivan and Company assumed operation of the field. The facilities for the field operation of the pilot were refined and implementation was begun. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. The experiments were performed at SEVVSU temperature using fluids and inoculum from the unit. The model described in last year's report was further validated using results from a core flood experiment. The model was able to simulate the results of one of the core flood experiments with good quality.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1992-03-01T23:59:59.000Z

262

Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

School Bus Idle School Bus Idle Reduction Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Pilot Program As part of the Children's Environmental Health Project, the Arizona

263

Microsoft PowerPoint - SW Regional Hydropower Conference - June 2007.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Engineers® of Engineers® Vision Statement Vision Statement Be the premier stewards of entrusted hydropower resources US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps

264

DOE Hydropower Program biennial report 1992--1993 (with an updated annotated bibliography)  

SciTech Connect (OSTI)

This report, the latest in a series of annual/biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1992 and 1993. The report discusses the activities in the four areas of the hydropower program: Environmental research; resource assessment; research coat shared with industry; and technology transfer. The report also offers an annotated bibliography of reports pertinent to hydropower, written by persons in Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States); Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1993-07-01T23:59:59.000Z

265

Microbial Field Pilot Study  

SciTech Connect (OSTI)

This report covers progress made during the first year of the Microbial Field Pilot Study project. Information on reservoir ecology and characterization, facility and treatment design, core experiments, bacterial mobility, and mathematical modeling are addressed. To facilitate an understanding of the ecology of the target reservoir analyses of the fluids which support bacteriological growth and the microbiology of the reservoir were performed. A preliminary design of facilities for the operation of the field pilot test was prepared. In addition, procedures for facilities installation and for injection treatments are described. The Southeast Vassar Vertz Sand Unit (SEVVSU), the site of the proposed field pilot study, is described physically, historically, and geologically. The fields current status is presented and the ongoing reservoir simulation is discussed. Core flood experiments conducted during the last year were used to help define possible mechanisms involved in microbial enhanced oil recovery. Two possible mechanisms, relative permeability effects and changes in the capillary number, are discussed and related to four Berea core experiments' results. The experiments were conducted at reservoir temperature using SEVVSU oil, brine, and bacteria. The movement and activity of bacteria in porous media were investigated by monitoring the growth of bacteria in sandpack cores under no flow conditions. The rate of bacteria advancement through the cores was determined. A mathematical model of the MEOR process has been developed. The model is a three phase, seven species, one dimensional model. Finite difference methods are used for solution. Advection terms in balance equations are represented with a third- order upwind differencing scheme to reduce numerical dispersion and oscillations. The model is applied to a batch fermentation example. 52 refs., 26 figs., 21 tabs.

Knapp, R.M.; McInerney, M.J.; Menzie, D.E.; Chisholm, J.L.

1990-11-01T23:59:59.000Z

266

BSCSP Basalt Pilot Phase II Factsheet 2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basalt Sequestration Pilot Test 1 Basalt Sequestration Pilot Test 1 FACTSHEET FOR PARTNERSHIP FIELD VALIDATION TEST Partnership Name Big Sky Regional Carbon Partnership Contacts: DOE/NETL Project Mgr. Name Organization E-Mail William Aljoe NETL William.Aljoe@netl.doe.gov Principal Investigator Lee Spangler Field Test Information: Field Test Name Basalt Sequestration Pilot Test Test Location Near Wallula township in Eastern Washington State Amount and Source of CO 2 Tons Source 1000 Refinery Field Test Partners (Primary Sponsors) Boise White Paper L.L.C., Shell Exploration and Production Company, Port of Walla Walla,

267

File:Federal Hydropower - Southwestern Power Administration.pdf | Open  

Open Energy Info (EERE)

Administration.pdf Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Southwestern Power Administration.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:35, 22 May 2013 Thumbnail for version as of 15:35, 22 May 2013 1,275 × 1,650, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

268

Profitability of a wind power plant project in comparison with a hydropower plant project in Croatia.  

E-Print Network [OSTI]

??Bis vor kurzem gab es praktisch kaum oder nur wenige erneuerbare Energieressourcen in Kroatien. Das Interesse Windkraftanlagen zu bauen hat in den vergangenen Jahren stark (more)

Tajic, Sadko

2012-01-01T23:59:59.000Z

269

Plant biodiversity and ethnobotany inside the projected impact area of the Upper Seti Hydropower Project,  

E-Print Network [OSTI]

prove very useful for sustainable, integrated resource management (Saxena et al. 2001). Conservation of forest ecosystems in Nepal is increasingly challenged by the rising demand for energy, prompting and that most were used as medicine, food, or timber. We propose specific species for sustainable use programs

Asselin, Hugo

270

Dependence of hydropower energy generation on forests in the Amazon Basin at local and regional scales  

Science Journals Connector (OSTI)

...including Brazil, Peru, Colombia...their hydropower energy capacity over...and most other renewable forms of electricity...solar and wind energy improve their...transition to renewable energy is storing excess...however, Brazils discovery...

Claudia M. Stickler; Michael T. Coe; Marcos H. Costa; Daniel C. Nepstad; David G. McGrath; Livia C. P. Dias; Hermann O. Rodrigues; Britaldo S. Soares-Filho

2013-01-01T23:59:59.000Z

271

Huge Potential for Hydropower: Assessment Highlights New Possible Clean Energy Sources  

Office of Energy Efficiency and Renewable Energy (EERE)

The Energy Departments New Stream-reach Development Assessment, conducted by Oak Ridge National Laboratory, has identified more than 65 gigawatts of untapped sustainable hydropower potential in U.S. rivers and streams.

272

Climate Change Effects on Hydropower Potential in the Alcantara River Basin in Sicily (Italy)  

Science Journals Connector (OSTI)

In recent years, increasing attention has been paid to hydropower generation, since it is a renewable, efficient, and reliable source of energy, as well as an effective tool to reduce the atmospheric concentrations of greenhouse gases resulting ...

G. T. Aronica; B. Bonaccorso

2013-09-01T23:59:59.000Z

273

Voluntary agreements for increasing energy-efficiency in industry: Case study of a pilot project with the steel industry in Shandong Province, China  

SciTech Connect (OSTI)

China faces a significant challenge in the years ahead to continue to provide essential materials and products for a rapidly-growing economy while addressing pressing environmental concerns. China's industrial sector is heavily dependent on the country's abundant, yet polluting, coal resources. While tremendous energy conservation and environmental protection achievements were realized in the industrial sector in the past, there remains a great gulf between the China's level of energy efficiency and that of the advanced countries of the world. Internationally, significant energy efficiency improvement in the industrial sector has been realized in a number of countries using an innovative policy mechanism called Voluntary Agreements. This paper describes international experience with Voluntary Agreements in the industrial sector as well as the development of a pilot program to test the use of such agreements with two steel mills in Shandong Province, China.

Price, Lynn; Worrell, Ernst; Sinton, Jonathan; Yun, Jiang

2003-03-01T23:59:59.000Z

274

Correlation between the precipitation and energy production at hydropower plants to mitigate flooding in the Missouri River Basin .  

E-Print Network [OSTI]

??Currently, hydropower plants serve as one source of green energy for power companies. These plants are located in various geographical regions throughout the United States (more)

Foley, Rachel (Rachel L.)

2013-01-01T23:59:59.000Z

275

Peru-World Bank Climate Projects | Open Energy Information  

Open Energy Info (EERE)

World Bank Climate Projects World Bank Climate Projects Jump to: navigation, search Name Peru-World Bank Climate Projects Agency/Company /Organization World Bank Sector Energy, Land Focus Area Renewable Energy, Hydro, Transportation, Forestry Topics Background analysis Country Peru South America References World Bank Project Database - Peru[1] Contents 1 Active Projects 1.1 Water Resources Management Modernization - IBRD/IDA 1.2 PE Santa Rosa Hydro Carbon Finance 1.3 PERU - Poechos Hydropower Project 1.4 LIMA TRANSPORT 1.5 PE Huaycoloro Landfill Gas Recovery 2 References Active Projects The World Bank currently has the following climate projects active in Peru: Water Resources Management Modernization - IBRD/IDA (10M - Active) PE Santa Rosa Hydro Carbon Finance (1.5M) Carbon Offset PERU - Poechos Hydropower Project (1.2M) Carbon Offset

276

Waste Isolation Pilot Plant Transportation Security | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Transportation Security Waste Isolation Pilot Plant Transportation Security Waste Isolation Pilot Plant Transportation Security More Documents &...

277

ANL CP-5 decontamination and decommissioning project necessary and sufficient pilot. Report of the standards identification team on the selection of the necessary and sufficient standards set  

SciTech Connect (OSTI)

The CP-5 reactor was a heavy-water moderated and cooled, highly-enriched uranium-fueled thermal reactor designed for supplying neutrons for research. The reactor was operated almost continuously for 25 years until its final shutdown in 1979. It is situated on approximately three acres in the southwestern section of Argonne National Laboratory. In 1980, all nuclear fuel and the heavy water that could be drained from the process systems were shipped off-site, and the CP-5 facility was placed into lay-up pending funding for decommissioning. It was maintained in the lay-up condition with a minimum of maintenance until 1990, when the decontamination and decommissioning (D and D) project began. This D and D project provides for the disassembly and removal of all radioactive components, equipment, and structures that are associated with the CP-5 facility. The experimental area around the CP-5 reactor has been prepared for D and D, and the area outside the facility has been remediated. The reactor primary coolant and support systems have been removed and packaged as waste. The significant remaining tasks are (1) removal of the reactor internals and the biological shield structure; (2) decontamination of the rod storage area; (3) decontamination of the various radioactive material storage and handling facilities, including the fuel pool; and (4) decontamination and dismantlement of the building. This report describes the scope of the project, identification of standards for various aspects of the project, the lessons learned, and consideration for implementation.

NONE

1996-05-01T23:59:59.000Z

278

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE  

E-Print Network [OSTI]

2005. Potential Changes in Hydropower Production from Globalon high elevation hydropower generation in California'ssources include imports (hydropower from the north, thermal

Sathaye, Jayant

2011-01-01T23:59:59.000Z

279

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

280

Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.  

SciTech Connect (OSTI)

This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

Howerton, Jack; Hwang, Diana

1984-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

In situ combustion - from pilot to commercial application  

SciTech Connect (OSTI)

In 1994, there are at least 14 active commercial in-situ combustion (ISC) projects worldwide. A review of these projects is carried out in order to emphasize the important factors which contributed to the success of the processes. The success of the developing an ISC pilot into a commercial ISC project is strongly connected with two factors: (a) starting the operation from the uppermost part of the structure and extending the process downwards and (b) application of the line drive well configuration instead of patterns, whenever is possible. An effective, peripheral line drive operation requires pool utilization. The most challenging phase towards commercialization of an ISC project is the field pilot design, implementation and evaluation. This paper is focused on the advantages of locating ISC pilot at the upper zone of the reservoir, due to the need for a full scale integration of the pilot with the subsequent semi- and commercial development of the process.

Turta, A. [Petroleum Recovery Institute, Alberta (Canada)

1995-02-01T23:59:59.000Z

282

Texas Propane Fleet Pilot Program | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. tiarravt058kelly2010p.pdf More Documents & Publications Texas Propane Vehicle Pilot Project Texas...

283

Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Scoring Tool Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session NORA WANG SUPRIYA GOEL GEOFF ELLIOTT Pacific Northwest National Laboratory JUNE 18, 2013 Meet the Team U.S. Department of Energy (DOE) � Project oversight � Strategic direction � Policy perspective Pacific Northwest National Laboratory (PNNL) � Technical lead � Scoring Tool development and maintenance SRA International (SRA) � Pilot management � Outreach and communications 2 I Energy Asset Score eere.energy.gov Pilot Participation Process 1. Sign the Pilot Participation Agreement by June 26 2. Provide DOE with points of contact for lead project coordinator and data collector(s)/tool user(s) by June 26 3. DOE provides Pilot Participants with username and password to

284

File:Federal Hydropower - Federal Energy Regulatory Commission.pdf | Open  

Open Energy Info (EERE)

Federal Hydropower - Federal Energy Regulatory Commission.pdf Federal Hydropower - Federal Energy Regulatory Commission.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Federal Energy Regulatory Commission.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 740 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:32, 22 May 2013 Thumbnail for version as of 15:32, 22 May 2013 1,275 × 1,650, 2 pages (740 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

285

File:Federal Hydropower - Bureau of Indian Affairs.pdf | Open Energy  

Open Energy Info (EERE)

Federal Hydropower - Bureau of Indian Affairs.pdf Federal Hydropower - Bureau of Indian Affairs.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Bureau of Indian Affairs.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 685 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:25, 22 May 2013 Thumbnail for version as of 15:25, 22 May 2013 1,275 × 1,650, 2 pages (685 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

286

Monument Valley Phytoremediation Pilot Study:  

Office of Legacy Management (LM)

1.8 1.8 U.S. Department of Energy UMTRA Ground Water Project Monument Valley Ground Water Remediation Work Plan: Native Plant Farming and Phytoremediation Pilot Study August 1998 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Project Number UGW-511-0015-10-000 Document Number U0029501 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0029501 Contents DOE/Grand Junction Office Monument Valley Ground Water Remediation Work Plan August 1998 Page v Contents Page Acronyms .

287

Dependence of hydropower energy generation on forests in the Amazon Basin at local and regional scales  

Science Journals Connector (OSTI)

...precipitation (26). Energy Pathways. Nations must...needs for electrical energy while minimizing GHG...social and environmental costs. In the near- to medium-term...wind, nuclear, and geothermal plants. Hydropower...advances for solar and wind energy improve their competitiveness...

Claudia M. Stickler; Michael T. Coe; Marcos H. Costa; Daniel C. Nepstad; David G. McGrath; Livia C. P. Dias; Hermann O. Rodrigues; Britaldo S. Soares-Filho

2013-01-01T23:59:59.000Z

288

Dependence of hydropower energy generation on forests in the Amazon Basin at local and regional scales  

Science Journals Connector (OSTI)

...given for the turbines and generators...Nations World Water Development Report 4: Managing...Greenhouse-gas emissions from...hydroelectric development of the Xingu River...Amazon hydropower development: Risk scenarios and environmental...life-cycle greenhouse gas (GHG) emissions...electric supply technologies. Energy 32:1543...

Claudia M. Stickler; Michael T. Coe; Marcos H. Costa; Daniel C. Nepstad; David G. McGrath; Livia C. P. Dias; Hermann O. Rodrigues; Britaldo S. Soares-Filho

2013-01-01T23:59:59.000Z

289

NETL: Mercury Emissions Control Technologies - Pilot Testing of Mercury  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing of Mercury Oxidation Catalysts Project Summary Testing of Mercury Oxidation Catalysts Project Summary URS Group, Inc., Austin, TX, will demonstrate at the pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion, and the use of a wet flue gas desulfurization (FGD) system downstream to remove the oxidized mercury at high efficiency. The project's pilot tests, conducted at electric generating plants using wet flue gas desulfurization systems and particulate collection systems, will be conducted for periods up to 14 months to provide data for future, full-scale designs. Mercury-oxidation potential will be measured periodically to provide long-term catalyst life data. The project is applicable to about 90,000 megawatts of generation capacity. Project partners are the Electric Power Research Institute, Palo Alto, CA, which will co-manage and co-fund the pilot tests, and five utilities.

290

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

291

Hydropower Generators Will Deliver New Energy from an Old Dam...  

Office of Environmental Management (EM)

2,000 homes for a year. The project also developed and installed an innovative fish collection and passage system that is reintroducing Washington's endangered steelhead...

292

Hydropower and Ocean Energy Resources and Technologies | Department...  

Energy Savers [EERE]

Several people are photographed standing on the barge. The Ocean Thermal Energy Conversion project at Hawaii's Natural Energy Lab was one of the first successful thermal ocean...

293

Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report  

SciTech Connect (OSTI)

This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

Gasper, John R. [Argonne National Laboratory] [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory] [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory] [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory] [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory] [Argonne National Laboratory; Wigmosta, Mark S. [PNNL] [PNNL; Voisin, Nathalie [PNNL] [PNNL; Rakowski, Cynthia [PNNL] [PNNL; Coleman, Andre [PNNL] [PNNL; Lowry, Thomas S. [SNL] [SNL

2014-05-19T23:59:59.000Z

294

Trade-offs of Water Use for Hydropower Generation and Biofuel Production in the Zambezi Basin in Mozambique  

Science Journals Connector (OSTI)

Abstract In the Zambezi basin in Mozambique, hydropower production is an important economic resource, with substantial development envisaged for the next decades. Irrigated agriculture currently plays a minor role, but irrigation development has a large potential and is an important government policy goal, especially aiming at the cultivation of biofuel crops. This contribution assesses interrelations and trade-offs between these two water-dependent development options. Scenario simulations under different climate and development assumptions show that adverse impacts of irrigation withdrawal on hydropower are low. Consequently, the use of water for irrigated agriculture can generate higher economic benefits than the use for hydropower production.

Philipp Stanzel; Harald Kling; Kit Nicholson

2014-01-01T23:59:59.000Z

295

Water Cycle Pilot Study  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Water Cycle Pilot Study To learn more about Earth's water cycle, the U.S. Department of Energy (DOE) has established a multi-laboratory science team representing five DOE...

296

Microsoft PowerPoint - SW HydropowerCouncil-060910.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CW appropriations are projected to decrease relative to inflation * The cost of the work we do is expected to increase at a rate greater than inflation increase at a rate...

297

The Role of the state in large-scale hydropower development perspectives from Chile, Ecuador, and Per  

E-Print Network [OSTI]

In recent years, governments in South America have turned to large-scale hydropower as a cost-effective way to improve livelihoods while addressing the energy 'trilemma': ensuring that future energy technologies provide ...

Zambrano-Barragn, Patricio Xavier

2012-01-01T23:59:59.000Z

298

Correlation between the precipitation and energy production at hydropower plants to mitigate flooding in the Missouri River Basin  

E-Print Network [OSTI]

Currently, hydropower plants serve as one source of green energy for power companies. These plants are located in various geographical regions throughout the United States and can be split into three main classifications: ...

Foley, Rachel (Rachel L.)

2013-01-01T23:59:59.000Z

299

Microsoft Word - Basalt Pilot Phase II Fact Sheet FY08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

16.0 Basalt Pilot 1 16.0 Basalt Pilot 1 FACTSHEET FOR PARTNERSHIP FIELD VALIDATION TEST Partnership Name Big Sky Regional Carbon Partnership Contacts: DOE/NETL Project Mgr. Name Organization E-Mail David Lang NETL LANG@netl.doe.gov Principal Investigator Lee Spangler Field Test Information: Basalt Sequestration Pilot Test Test Location Near Wallula township in Eastern Washington State Amount and Source of CO 2 Tons Source 3000 Refinery Field Test Partners (Primary Sponsors) Pacific Northwest National Lab - Pacific Northwest Division, Idaho

300

The transnational diffusion of global environmental concerns via INGOs in China : a new framework for understanding diffusion in authoritarian contexts  

E-Print Network [OSTI]

over the Nujiang hydropower dam project in Yunnan broughtare highly concentrated on hydropower development and waterRiver are the two major hydropower projects. Hydropower

Matsuzawa, Setsuko

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Weatherization Innovation Pilot Program Projects | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

purchasing, and sale of carbon offsets through the Maine State Housing Authority. The New Hampshire Community Loan Fund, based in Concord, has been selected to receive 600,000...

302

WINDExchange: Wind for Schools Pilot Project Results  

Wind Powering America (EERE)

that develops wind farms and sells renewable energy certificates (commonly known as "green tags") Community Energy provided much of the cost of the standard system during the...

303

Stream-reach Identification for New Run-of-River Hydropower Development through a Merit Matrix Based Geospatial Algorithm  

SciTech Connect (OSTI)

Even after a century of development, the total hydropower potential from undeveloped rivers is still considered to be abundant in the United States. However, unlike evaluating hydropower potential at existing hydropower plants or non-powered dams, locating a feasible new hydropower plant involves many unknowns, and hence the total undeveloped potential is harder to quantify. In light of the rapid development of multiple national geospatial datasets for topography, hydrology, and environmental characteristics, a merit matrix based geospatial algorithm is proposed to help identify possible hydropower stream-reaches for future development. These hydropower stream-reaches sections of natural streams with suitable head, flow, and slope for possible future development are identified and compared using three different scenarios. A case study was conducted in the Alabama-Coosa-Tallapoosa (ACT) and Apalachicola-Chattahoochee-Flint (ACF) hydrologic subregions. It was found that a merit matrix based algorithm, which is based on the product of hydraulic head, annual mean flow, and average channel slope, can help effectively identify stream-reaches with high power density and small surface inundation. The identified stream-reaches can then be efficiently evaluated for their potential environmental impact, land development cost, and other competing water usage in detailed feasibility studies . Given that the selected datasets are available nationally (at least within the conterminous US), the proposed methodology will have wide applicability across the country.

Pasha, M. Fayzul K. [California State University, Fresno; Yeasmin, Dilruba [ORNL; Kao, Shih-Chieh [ORNL; Hadjerioua, Boualem [ORNL; Wei, Yaxing [ORNL; Smith, Brennan T [ORNL

2014-01-01T23:59:59.000Z

304

The Use of Traits-Based Assessment to Estimate Effects of Hydropower Projects on Fish Populations  

E-Print Network [OSTI]

that influence the risk of downstream passage losses at hydroelectric power plants www.ornl.gov #12;

305

MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT  

E-Print Network [OSTI]

validation procedures in the commercial marine license reporting program (MRIP For-Hire Project) by Hongguang1 MARINE RECREATIONAL INFORMATION PROGRAM PROJECT REPORT Hawaii for-hire pilot study to incorporate

306

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

307

CMVRTC: WRI Pilot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WRI PRE-FOt WRI PRE-FOt diagram The purpose of this Pre-FOT is to provide a bridge between the just-completed WRI Commercial Mobile Radio Services (CMRS) Pilot Test (Pilot Test) (31 Jan 11) and the desired large-scale FOT (2014). A bridge is needed because critical portions of the WRI CMRS Pilot Test were not completed or fully tested (e.g. pull-in/by-pass, safety sensor data present in Safety Data Message (SDM), flexible geo-fencing, carrier interface), and the Government Back Office System (GBOS) was not developed in a way to support real, large-scale WRI testing (e.g., interface not relevant to enforcement, system not stable or robust, safety sensor data not understood by developers). This effort, the WRI CMRS Pre-FOT End-to-End System Validation (WRI Pre-FOT), seeks to develop and test a complete end-to-end

308

Short-term electricity dispatch optimization of Ertan hydropower plant based on data by field tests  

Science Journals Connector (OSTI)

A short-term electricity dispatch optimization program required by the Ertan hydropower plant is developed to maximize hydropower production. Three field tests in various operating heads were carried out in the period of May 2009 to March 2010. Based on data of five test conditions three operating zones for units in various operating heads were proposed. A short-term electricity dispatch optimization model was developed with physical and operational constraints. Unit commitment strategy was put forward for model solution in which unit statuses and output statuses were classified. The strategy aimed at formulating better unit commitment plan according to forecasted load demand ancillary service requirements and initial operating status. The model and the strategy were verified by real cases. The results show that the optimal load distribution among units at every interval can be easily solved by the genetic algorithm based on a fixed unit commitment plan. Schedules are developed with higher average generation efficiency. Units can also be scheduled to operate for a less time within the rough zone and the second feasible zone. The proposed method is already operational for dispatch engineers of the Ertan hydropower plant to determine half-hourly schedules in one day.

Chao Ma; Haijun Wang; Jijian Lian

2011-01-01T23:59:59.000Z

309

Greenhouse Gas Emissions from U.S. Hydropower Reservoirs: FY2011 Annual Progress Report  

SciTech Connect (OSTI)

The primary objective of this study is to quantify the net emissions of key greenhouse gases (GHG) - notably, CO{sub 2} and CH{sub 4} - from hydropower reservoirs in moist temperate areas within the U.S. The rationale for this objective is straightforward: if net emissions of GHG can be determined, it would be possible to directly compare hydropower to other power-producing methods on a carbon-emissions basis. Studies of GHG emissions from hydropower reservoirs elsewhere suggest that net emissions can be moderately high in tropical areas. In such areas, warm temperatures and relatively high supply rates of labile organic matter can encourage high rates of decomposition, which (depending upon local conditions) can result in elevated releases of CO{sub 2} and CH{sub 4}. CO{sub 2} and CH{sub 4} emissions also tend to be higher for younger reservoirs than for older reservoirs, because vegetation and labile soil organic matter that is inundated when a reservoir is created can continue to decompose for several years (Galy-Lacaux et al. 1997, Barros et al. 2011). Water bodies located in climatically cooler areas, such as in boreal forests, could be expected to have lower net emissions of CO{sub 2} and CH{sub 4} because their organic carbon supplies tend to be relatively recalcitrant to microbial action and because cooler water temperatures are less conducive to decomposition.

Stewart, Arthur J [ORNL; Mosher, Jennifer J [ORNL; Mulholland, Patrick J [ORNL; Fortner, Allison M [ORNL; Phillips, Jana Randolph [ORNL; Bevelhimer, Mark S [ORNL

2012-05-01T23:59:59.000Z

310

Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE _______________ ) ) ss: __________________ COUNTY OF _____________ ) That I, ________________________, am the _________________________ (Indicate relationship) of ___________________________, who is deceased and make the attached request pursuant to 10 CFR, Section 1008. That the information contained on the attached request is true and correct to the best of my knowledge and belief, and I am signing this authorization subject to the penalties provided in 18 U.S.C. 1001. ____________________________ SIGNATURE NOTARIZATION: SUBSCRIBED and SWORN to before me this ______day of __________, 20_____

311

Changes in the Economic Value of Variable Generation at High Penetration Levels: A Pilot Case Study of California  

E-Print Network [OSTI]

4.3 Hydropower and Pumped Hydro Storage . . 4.4 Thermal24 Integration of Wind and Hydropower Systems; Volume 1:and Economics of Wind and Hydropower Integration. Technical

Mills, Andrew

2013-01-01T23:59:59.000Z

312

MHK Technologies/European Pico Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

European Pico Pilot Plant European Pico Pilot Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage European Pico Pilot Plant.jpg Technology Profile Primary Organization Wave Energy Centre Project(s) where this technology is utilized *MHK Projects/OWC Pico Power Plant Technology Resource Click here Wave Technology Type Click here Oscillating Water Column Technology Readiness Level Click here TRL 4: Proof of Concept Technology Description A bottom mounted shoreline oscillating water column structure equipped with a horizontal axis Wells turbine generator set and a guide vane stator installed on each side of the rotor Control options are facilitated by a relief valve presently a slow acting valve with plans to substitute a fast acting mechanism in the wave chamber

313

Commercial Building Energy Asset Score: 2013 Pilot Overview  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score: Commercial Building Energy Asset Score: 2013 Pilot Overview June 17, 2013 Joan Glickman, DOE Patty Kappaz, SRA 1 eere.energy.gov Agenda � Team Introduction � Commercial Building Energy Asset Score Update * Program overview * Progress to date * Objectives of the 2013 Pilot * Future plans � Process for Pilot Participation 2 I Energy Asset Score eere.energy.gov � � � � � � � Meet the Team U.S. Department of Energy (DOE) Project oversight Strategic direction Policy perspective Pacific Northwest National Laboratory (PNNL) Technical lead Scoring Tool development and maintenance SRA International (SRA) Pilot management Outreach and communications 3 I Energy Asset Score eere.energy.gov Program Goals * Develop a national energy asset rating to --

314

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

Renewable Energy (Wind & Hydropower Technologies Program) ofEnergy and the Wind & Hydropower Technologies Program OfficeRenewable Energy (Wind & Hydropower Technologies Program) of

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

315

Waste Isolation Pilot Plant - Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reports Reports Waste Isolation Pilot Plant Review Report 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013 Review Report 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant, November 2012 Activity Reports 2011 Orientation Visit to the Waste Isolation Pilot Plant, September 2011 Review Reports 2007 Independent Oversight Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant, December 2007 Review Reports 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant - Summary Report, August 2002 Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002

316

Institute for Renewable Energy Ltd Preparation of a pilot biogas CHP plant integrated with  

E-Print Network [OSTI]

Institute for Renewable Energy Ltd Poland 1 Preparation of a pilot biogas CHP plant integrated on the preparation phase for a pilot investment in Koczala, Northern Poland, relating to an agricultural biogas CHP production and utilisation of agricultural biogas the project focused on BAT obtainable from various European

317

EECBG Success Story: Solar Projects Provide Energy to County...  

Broader source: Energy.gov (indexed) [DOE]

along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter....

318

About the Guidelines for Home Energy Professionals Project |...  

Broader source: Energy.gov (indexed) [DOE]

About the Office Weatherization Assistance Program Where to Apply for Assistance What is Weatherization Goals & Metrics Pilot Projects Success Stories Guidelines for Home Energy...

319

National Grid Deep Energy Retrofit Pilot  

SciTech Connect (OSTI)

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wider adoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gauge long-term energy performance, durability, and occupant comfort.

Neuhauser, K.

2012-03-01T23:59:59.000Z

320

1 Energy Markets and Policy Group Energy Analysis Department The Impact of Wind Power Projects  

E-Print Network [OSTI]

1 Energy Markets and Policy Group · Energy Analysis Department The Impact of Wind Power Projects, Wind & Hydropower Technologies Program #12;2 Energy Markets and Policy Group · Energy Analysis Concerns for Wind Energy Fall Into Three Potential Categories 1. Area Stigma: Concern that rural areas

Firestone, Jeremy

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Evaluating greenhouse gas emissions from hydropower complexes on large rivers in Eastern Washington  

SciTech Connect (OSTI)

Water bodies, such as freshwater lakes, are known to be net emitters of carbon dioxide (CO2), and methane (CH4). In recent years, significant greenhouse gas (GHG) emissions from tropical, boreal, and mid-latitude reservoirs have been reported. At a time when hydropower is increasing worldwide, better understanding of seasonal and regional variation in GHG emissions is needed in order to develop a predictive understanding of such fluxes within man-made impoundments. We examined power-producing dam complexes within xeric temperate locations in the northwestern United States. Sampling environments on the Snake (Lower Monumental Dam Complex) and Columbia Rivers (Priest Rapids Dam Complex) included tributary, mainstem, embayment, forebay, and tailrace areas during winter and summer 2012. At each sampling location, GHG measurement pathways included surface gas flux, degassing as water passed through dams during power generation, ebullition within littoral embayments, and direct sampling of hyporheic pore-water. Measurements were also carried out in a free-flowing reach of the Columbia River to estimate unaltered conditions. Surface flux resulted in very low emissions, with reservoirs acting as a sink for CO2 (up to 262 mg m-2 d-1, which is within the range previously reported for similarly located reservoirs). Surface flux of methane remained below 1 mg CH4 m-2d-1, a value well below fluxes reported previously for temperate reservoirs. Water passing through hydroelectric projects acted as a sink for CO2 during winter and a small source during summer, with mean degassing fluxes of 117 and 4.5 t CO2 d-1, respectively. Degassing of CH4 was minimal, with mean fluxes of 3.1 10-6 and 5.6 10-4 t CH4 d-1 during winter and summer, respectively. Gas flux due to ebullition was greater in coves located within reservoirs than in coves within the free flowing Hanford Reachand CH4 flux exceeded that of CO2. Methane emissions varied widely across sampling locations, ranging from 10.5 to 1039 mg CH4 m-2 d-1, with mean fluxes of 324 mg CH4 m-2 d-1in Lower Monumental Dam reservoir and 482 mg CH4 m-2d-1 in the Priest Rapids Dam reservoir. The magnitude of methane flux due to ebullition was unexpectedly high, and falls within the range recently reported for other temperate reservoirs around the world, further suggesting that this methane source should be considered in estimates of global greenhouse gas emissions. Methane flux from sediment pore-water within littoral embayments averaged 4.2 mg m-2 d-1 during winter and 8.1 mg m-2 d-1 during summer, with a peak flux of 19.8 mg m-2d-1 (at the same location where CH4 ebullition was also the greatest). Carbon dioxide flux from sediment pore-water averaged approximately 80 mg m-2d-1 with little difference between winter and summer. Similar to emissions from ebullition, flux from sediment pore-water was higher in reservoirs than in the free flowing reach.

Arntzen, Evan V.; Miller, Benjamin L.; O'Toole, Amanda C.; Niehus, Sara E.; Richmond, Marshall C.

2013-03-15T23:59:59.000Z

322

PILOT: design and capabilities  

E-Print Network [OSTI]

The proposed design for PILOT is a general-purpose, wide-field 1 degree 2.4m, f/10 Ritchey-Chretien telescope, with fast tip-tilt guiding, for use 0.5-25 microns. The design allows both wide-field and diffraction-limited use at these wavelengths. The expected overall image quality, including median seeing, is 0.28-0.3" FWHM from 0.8-2.4 microns. Point source sensitivities are estimated.

W. Saunders; P. R. Gillingham; A. J. McGrath; J. W. V. Storey; J. S. Lawrence

2008-01-29T23:59:59.000Z

323

Federal Technology Deployment Pilot: Exterior Solid State Lighting  

Broader source: Energy.gov [DOE]

Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingprovides an overview of the U.S. Department of Energy's Solid-State Lighting Program and an exterior solid-state lighting federal technology deployment pilot project.

324

Making the World a Witness report on the pilot phase  

E-Print Network [OSTI]

of this unlikely consortium as the beginning of a paradigm shift, when instruments of national security, heretoforeMaking the World a Witness report on the pilot phase december 2010 - june 2012 Satellite Sentinel december 2010 - june 2012 Satellite Sentinel Project #12;Table of Contents Introduction by Charlie Clements

Liu, Xiaole Shirley

325

MHK Projects | Open Energy Information  

Open Energy Info (EERE)

MHK Projects MHK Projects Jump to: navigation, search << Return to the MHK database homepage Click one of the following Marine Hydrokinetic Projects for more information: Loading... 40MW Lewis project ADM 3 ADM 4 ADM 5 AW Energy EMEC AWS II Admirality Inlet Tidal Energy Project Agucadoura Alaska 1 Alaska 13 Alaska 17 Alaska 18 Alaska 24 Alaska 25 Alaska 28 Alaska 31 Alaska 33 Alaska 35 Alaska 36 Alaska 7 Algiers Cutoff Project Algiers Light Project Amity Point Anconia Point Project Angoon Tidal Energy Plant Aquantis Project Ashley Point Project Astoria Tidal Energy Atchafalaya River Hydrokinetic Project II Avalon Tidal Avondale Bend Project BW2 Tidal Bar Field Bend Barfield Point Bayou Latenache Belair Project Belleville BioSTREAM Pilot Plant Bluemill Sound Bondurant Chute Bonnybrook Wastewater Facility Project 1

326

Oversight Reports - Waste Isolation Pilot Plant | Department...  

Broader source: Energy.gov (indexed) [DOE]

2011 Orientation Visit to the Waste Isolation Pilot Plant HIAR-WIPP-2011-09-07 November 26, 2007 Independent Oversight Inspection, Waste Isolation Pilot Plant - December 2007...

327

Waste Isolation Pilot Plant | Department of Energy  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Operators prepare drums of contact-handled transuranic waste for loading into transportation containers Operators prepare...

328

Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy reve  

SciTech Connect (OSTI)

Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legal requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modelling with models that predict ecosystem responses to flow.

Jager, Yetta [ORNL; Smith, Brennan T [ORNL

2008-02-01T23:59:59.000Z

329

Microsoft Word - Bldg 100 Pilot Test.doc  

Office of Legacy Management (LM)

DOE-LM/GJ791-2005 DOE-LM/GJ791-2005 Pinellas Environmental Restoration Project Young - Rainey STAR Center Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy Building 100 Area Enhanced Bioremediation Pilot Test Final Report January 2005 Page ii Contents 1.0 Introduction......................................................................................................................... 1 2.0 Results from the May 2004 (P8) Sampling Event .............................................................. 1 3.0 Microorganism Data

330

DOE Announces Funding Opportunity of up to $200 Million for Pilot and  

Broader source: Energy.gov (indexed) [DOE]

Funding Opportunity of up to $200 Million for Pilot Funding Opportunity of up to $200 Million for Pilot and Demonstration Scale Biorefinery Projects DOE Announces Funding Opportunity of up to $200 Million for Pilot and Demonstration Scale Biorefinery Projects December 22, 2008 - 8:51am Addthis Projects Will Demonstrate Continued Commitment to Develop Sustainable, Cost-Competitive Advanced Biofuels WASHINGTON - The U.S. Department of Energy (DOE) today announced the issuance of a Funding Opportunity Announcement (FOA) for up to $200 million over six years (FY 2009 - FY 2014), subject to annual appropriations, to support the development of pilot and demonstration-scale biorefineries including the use of feedstocks such as algae and production of advanced biofuels such as bio-butanol, green gasoline and other innovative biofuels.

331

NREL: Department of Defense Energy Programs - Energy Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Net Zero Initiative Projects Photo a man dressed in Army fatigues plugging in an electric car. In 2012, nine pilot projects were chosen for the U.S. Army Net Zero Initiative to...

332

WIPP site and vicinity geological field trip. A report of a field trip to the proposed Waste Isolation Pilot Plant project in Southeastern New Mexico, June 16 to 18, 1980  

SciTech Connect (OSTI)

The Environmental Evaluation Group is conducting an assessment of the radiological health risks to people from the Waste Isolation Pilot Plant. As a part of this work, EEG is making an effort to improve the understanding of those geological issues concerning the WIPP site which may affect the radiological consequences of the proposed repository. One of the important geological issues to be resolved is the timing and the nature of the dissolution processes which may have affected the WIPP site. EEG organized a two-day conference of geological scientists, on January 17-18, 1980. On the basis of the January conference and the June field trip, EEG has formed the following conclusions: (1) it has not been clearly established that the site or the surrounding area has been attacked by deep dissolution to render it unsuitable for the nuclear waste pilot repository; (2) the existence of an isolated breccia pipe at the site unaccompanied by a deep dissolution wedge, is a very remote possibility; (3) more specific information about the origin and the nature of the brine reservoirs is needed. An important question that should be resolved is whether each encounter with artesian brine represents a separate pocket or whether these occurrences are interconnected; (4) Anderson has postulated a major tectonic fault or a fracture system at the Basin margin along the San Simon Swale; (5) the area in the northern part of the WIPP site, identified from geophysical and bore hole data as the disturbed zone, should be further investigated to cleary understand the nature and significance of this structural anomaly; and (6) a major drawback encountered during the discussions of geological issues related to the WIPP site is the absence of published material that brings together all the known information related to a particular issue.

Chaturvedi, L.

1980-10-01T23:59:59.000Z

333

Carbon Offsetting: An Efficient Way to Reduce Emissions or to Avoid Reducing Emissions? An Investigation and Analysis of Offsetting Design and Practice in India and China  

E-Print Network [OSTI]

for wind, biomass and hydropower projects in India, Iat wind power, biomass energy and hydropower projects inassumptions 43 Hydropower projects: inappropriate

Haya, Barbara

2010-01-01T23:59:59.000Z

334

Portland General Electric Co. Pilot Evaluation and  

E-Print Network [OSTI]

capability to support the utility's control of residential customers' central electric space heating systems DIRECT LOAD CONTROL PILOT FOR ELECTRIC SPACE HEAT #12;Direct Load Control Pilot for Electric Space Heat) an evaluation report of its direct load control pilot for electric space heat, called "Direct Load control Pilot

335

Microsoft PowerPoint - Hydropower conf SDOX June 2008 final [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Supersaturated Dissolved Oxygen (SDOX(tm)) Supersaturated Dissolved Oxygen (SDOX(tm)) Delivery Technology at Norfork Dam Delivery Technology at Norfork Dam Scott Osborn Chief Technology Officer Scott Osborn, Chief Technology Officer Clay Thompson, Senior Engineer Southwestern Federal Hydropower Conference June 12, 2008 BlueInGreen, LLC 535 W. Research Blvd. Fayetteville, AR 72701 (479) 527 6378 , (479) 527-6378 Background Background  Thanks to Marshall Boyken, Southwestern Power Administration Tulsa for inviting us and setting this up Administration, Tulsa for inviting us and setting this up.  The original presentation is from a meeting concerning low DO at Norfork Dam in Arkansas and how BlueInGreen's technology can address this problem.  Norfork River (tailrace) is 303(d) listed for low DO, feeds Norfork National

336

File:Federal Hydropower - U.S. Geological Survey.pdf | Open Energy  

Open Energy Info (EERE)

Survey.pdf Survey.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - U.S. Geological Survey.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 794 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:41, 22 May 2013 Thumbnail for version as of 15:41, 22 May 2013 1,275 × 1,650, 2 pages (794 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

337

File:Federal Hydropower - Western Area Power Administration.pdf | Open  

Open Energy Info (EERE)

Western Area Power Administration.pdf Western Area Power Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Western Area Power Administration.pdf Size of this preview: 466 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,305 × 1,680 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:42, 22 May 2013 Thumbnail for version as of 15:42, 22 May 2013 1,305 × 1,680, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

338

Design and Implementation of a new Autonomous Sensor Fish to Support Advanced Hydropower Development  

SciTech Connect (OSTI)

Acceleration in development of additional conventional hydropower requires tools and methods to perform laboratory and in-field validation of turbine performance and fish passage claims. The new-generation Sensor Fish has been developed with more capabilities to accommodate a wider range of users over a wider range of turbine designs and operating environments. It provides in situ measurements of three dimensional (3D) accelerations, 3D rotational velocities, 3D orientation, pressure, and temperature at a sampling frequency of 2048 Hz. It also has an automatic floatation system and built-in radio frequency transmitter for recovery. The relative errors of the pressure, acceleration and rotational velocity were within 2%, 5%, and 5%, respectively. The accuracy of orientation was within 4 and accuracy of temperature was 2C. It is being deployed to evaluate the biological effects of turbines or other hydraulic structures in several countries.

Deng, Zhiqun; Lu, Jun; Myjak, Mitchell J.; Martinez, Jayson J.; Tian, Chuan; Morris, Scott J.; Carlson, Thomas J.; Zhou, Da; Hou, Hongfei

2014-11-04T23:59:59.000Z

339

Fish Passage Assessment of an Advanced Hydropower Turbine and Conventional Turbine Using Blade-strike Modeling  

SciTech Connect (OSTI)

In the Columbia and Snake River basins, several species of Pacific salmon were listed under the Endangered Species Act of 1973 due to significant declines of fish population. Dam operators and design engineers are thus faced with the task of making those hydroelectric facilities more ecologically friendly through changes in hydro-turbine design and operation. Public Utility District No. 2 of Grant County, Washington, applied for re-licensing from the U.S. Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that were designed to increase power generation and improve fish passage conditions. We applied both deterministic and stochastic blade-strike models to the newly installed turbine and an existing turbine. Modeled probabilities were compared to the results of a large-scale live fish survival study and a sensor fish study under the same operational parameters. Overall, injury rates predicted by the deterministic model were higher than experimental rates of injury while those predicted by the stochastic model were in close agreement with experiment results. Fish orientation at the time of entry into the plane of the leading edges of the turbine runner blades was an important factor contributing to uncertainty in modeled results. The advanced design turbine had slightly higher modeled injury rates than the existing turbine design; however, there was no statistical evidence that suggested significant differences in blade-strike injuries between the two turbines and the hypothesis that direct fish survival rate through the advanced hydropower turbine is equal or better than that through the conventional turbine could not be rejected.

Deng, Zhiqun; Carlson, Thomas J.; Dauble, Dennis D.; Ploskey, Gene R.

2011-01-04T23:59:59.000Z

340

Pilot Demonstration of Phased Retrofits in Florida Homes (Fact Sheet)  

SciTech Connect (OSTI)

The Florida Solar Energy Center (FSEC) and Florida Power and Light are pursuing a collaborative energy research/utility partnership to retrofit a large number of homes using a phased approach. The project is creating detailed data on the energy and economic performance of two levels of home retrofit - simple and deep. Acting as a pilot, this project is expected to provide the information necessary to significantly reduce energy use through much larger community-scale projects in collaboration with utilities, program administrators and other market leader stakeholders.

Not Available

2014-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Property:Project(s) where this technology is utilized | Open Energy  

Open Energy Info (EERE)

Project(s) where this technology is utilized Project(s) where this technology is utilized Jump to: navigation, search Property Name Project(s) where this technology is utilized Property Type Page Marine and Hydrokinetic Technology Project Pages using the property "Project(s) where this technology is utilized" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/AirWEC + MHK Projects/Ocean Trials Ver 2 + MHK Technologies/AquaBuoy + MHK Projects/Figueira da Foz Portugal +, MHK Projects/Humboldt County Wave Project +, MHK Projects/Makah Bay Offshore Wave Pilot Project +, ... MHK Technologies/Archimedes Wave Swing + MHK Projects/AWS II +, MHK Projects/Portugal Pre Commercial Pilot Project + MHK Technologies/Atlantis AN 150 + MHK Projects/Gujarat + MHK Technologies/Atlantis AR 1000 + MHK Projects/Castine Harbor Badaduce Narrows +, MHK Projects/Gujarat +, MHK Projects/Tidal Energy Device Evaluation Center TIDEC +

342

Project 370  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

crshadd@sandia.gov crshadd@sandia.gov O 2 /CO 2 RECYCLE COAL COMBUSTION TO MINIMIZE POLLUTANTS Description O 2 /CO 2 recycle coal combustion is a promising, retrofittable technique for electric power production, while producing a nearly pure stream of CO 2 for subsequent use or sequestration. Most pollutant emissions, including NO x , are lower in this process, compared to conventional pulverized coal combustion. However, laboratory and pilot-scale tests to date have shown a wide variation in the fractional reduction of NO x when adopting this technology, suggesting that further improvements in NO x reduction are possible, given a better understanding of the dominant routes of NO x production and destruction in these systems. Goals The goal of this project is to determine the relative influence of three different

343

Project 261  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOVEL CORROSION SENSOR FOR ADVANCED NOVEL CORROSION SENSOR FOR ADVANCED FOSSIL ENERGY POWER SYSTEMS Description The overall objective of this proposed project is to develop a new technology for on-line corrosion monitoring based on an innovative concept. The specific objectives and corresponding tasks are (1) develop the sensor and electronic measurement system; (2) evaluate and improve the system in a laboratory muffle furnace; and (3) evaluate and improve the system through tests conducted in a pilot-scale coal combustor (~1 MW). Fireside corrosion refers to the metal loss caused by chemical reactions on surfaces exposed to the combustion environment. Such corrosion is the leading mechanism for boiler tube failures and is a serious concern for current and future energy plants due to the introduction of technologies targeting emissions

344

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409  

Broader source: Energy.gov (indexed) [DOE]

Grant Grant Amount Non-Fed Amount Project Location (City) Project Location (State) Description 1) Pilot and Demonstration Scale FOA - Pilot Scale Algenol Biofuels Inc. $25,000,000 $33,915,478 Freeport TX This project will make ethanol directly from carbon dioxide and seawater using algae. The facility will have the capacity to produce 100,000 gallons of fuel- grade ethanol per year. American Process Inc. $17,944,902 $10,148,508 Alpena MI This project will produce fuel and potassium acetate, a compound with many industrial applications, using processed wood generated by Decorative Panels International, an existing hardboard manufacturing facility in Alpena. The pilot plant will

345

Waste Isolation Pilot Plant Needs Assessment | Department of...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Needs Assessment Waste Isolation Pilot Plant Needs Assessment May 2012 This Needs Assessment for former Waste Isolation Pilot Plant production workers...

346

Waste Isolation Pilot Plant Activites | Department of Energy  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites More Documents & Publications EIS-0026: 2010 Annual Mitigation...

347

Waste Isolation Pilot Plant Update | Department of Energy  

Office of Environmental Management (EM)

Isolation Pilot Plant Update Waste Isolation Pilot Plant Update Waste Isolation Pilot Plant Update More Documents & Publications TRUPACT-III Quick Facts "TRU" Success: SRS Recovery...

348

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant...

349

El Paso Electric Company - Solar PV Pilot Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

El Paso Electric Company - Solar PV Pilot Program El Paso Electric Company - Solar PV Pilot Program El Paso Electric Company - Solar PV Pilot Program < Back Eligibility Commercial Construction Fed. Government Industrial Installer/Contractor Local Government Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Solar Buying & Making Electricity Maximum Rebate Residential: $7,500 Non-Residential: $50,000 Per Customer with Multiple Projects: 25% of 2013 incentive budget Per Service Provider with Multiple Projects: 50% of 2013 incentive budget in each category Program Info Start Date March 2010 State Texas Program Type Utility Rebate Program Rebate Amount Residential: $0.75/W DC Non-Residential: $1.00/W DC Provider El Paso Electric Solar PV Pilot Program '''''El Paso Electric's 2013 Solar PV Rebate program will reopen at 12:00

350

Cost benefit analysis for the implementation of smart metering with pilot  

Open Energy Info (EERE)

benefit analysis for the implementation of smart metering with pilot benefit analysis for the implementation of smart metering with pilot project (Smart Grid Project) Jump to: navigation, search Project Name Cost benefit analysis for the implementation of smart metering with pilot project Country Slovakia Coordinates 48.669025°, 19.699024° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.669025,"lon":19.699024,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

High efficiency waste to energy facility -- Pilot plant design  

SciTech Connect (OSTI)

Waste To Energy facilities are commonly acceptable to the environment and give benefits in two main areas: one is a hygienic waste disposal and another is waste heat energy recovery to save fossil fuel consumption. Recovered energy is used for electricity supply, and it is required to increase the efficiency of refuse to electric energy conversion, and to spread the plant construction throughout the country of Japan, by the government. The national project started in 1992, and pilot plant design details were established in 1995. The objective of the project is to get 30% of energy conversion efficiency through the measure by raising the steam temperature and pressure to 500 C and 9.8 MPa respectively. The pilot plant is operating under the design conditions, which verify the success of applied technologies. This paper describes key technologies which were used to design the refuse burning boiler, which generates the highest steam temperature and pressure steam.

Orita, Norihiko; Kawahara, Yuuzou; Takahashi, Kazuyoshi; Yamauchi, Toru; Hosoda, Takuo

1998-07-01T23:59:59.000Z

352

Obama Administration Announces Job-Creating Grid Modernization Pilot  

Broader source: Energy.gov (indexed) [DOE]

Job-Creating Grid Modernization Job-Creating Grid Modernization Pilot Projects Obama Administration Announces Job-Creating Grid Modernization Pilot Projects October 5, 2011 - 11:52am Addthis Washington, D.C. - Demonstrating its commitment to job creation and modernizing America's infrastructure, the Obama Administration today announced it would accelerate the permitting and construction of seven proposed electric transmission lines. This move will speed the creation of thousands of construction and operations jobs while transforming the nation's electric system into a modern, 21st century grid that is safer and more secure, and gives consumers more energy choices. "The President wants to get America working again. He is committed to cutting red tape and making immediate investments to put people to work

353

China's post-reform policy implementation gaps and governmental vs. non-governmental fire alarm solutions  

E-Print Network [OSTI]

Ibid. Walker (2008). planned hydropower projects in Yunnanlands are expropriated for hydropower developments. In 2004to lose their lands for a hydropower project on the Nujiang

Hart, Melanie M.

2010-01-01T23:59:59.000Z

354

Integrated Project Team RM  

Broader source: Energy.gov (indexed) [DOE]

Integrated Project Team (IPT) Review Module Integrated Project Team (IPT) Review Module March 2010 CD-0 This R O 0 Review Modul OFFICE OF Inte C CD-1 le was piloted F ENVIRO Standard R grated P Rev Critical Decis CD-2 M at the OR U 23 incorporated ONMENTAL Review Plan Project Te view Module sion (CD) Ap CD March 2010 33 Disposition in the Review L MANAGE n (SRP) eam (IPT e pplicability D-3 Project in 200 Module. EMENT T) CD-4 09. Lessons lea Post Ope arned have been eration n Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

355

Microsoft PowerPoint - ACOE Regional HydroPower Conference Presentation.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FEDERAL FEDERAL HYDROPOWER CONFERENCE Tulsa, Oklahoma June 10 - 11, 2009 NERC Requirements for Generator Owner and Operator Sarah M. Blankenship, NERC Compliance Officer How do we create a culture that combines Processes, Policies and Procedures, PEOPLE and Technology? Development of an Internal NERC Compliance Program Applicable NERC Requirements for Functions GOP GO BAL-005-0 R1 CIP-001-1 R1R2 R3R4 (Sabotage Reporting) COM-002-2 R1(Communications) EOP-004-1 R2 R3 (Disturbance Reporting) Can be combined into an Integrated Plan with CIP-001-1 and CIP-008-1. EOP-009-0 R1 R2 (Regional Black Start Capability Plan) Applicable NERC Requirements for Functions GOP GO FAC-002-0 R1R2 (Coordination of Plans for New Facilities) FAC-008-1 R1 R1.1R1.2 R1.2.1R1.2.2 R1.3 R1.3.1R1.3.2

356

File:Federal Hydropower - U..S. Army Corps of Engineers.pdf | Open Energy  

Open Energy Info (EERE)

U..S. Army Corps of Engineers.pdf U..S. Army Corps of Engineers.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - U..S. Army Corps of Engineers.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 925 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:37, 22 May 2013 Thumbnail for version as of 15:37, 22 May 2013 1,275 × 1,650, 2 pages (925 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

357

Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction  

SciTech Connect (OSTI)

In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

Karjalainen, Timo P., E-mail: timopauli.karjalainen@oulu.f [Thule Institute, University of Oulu, P.O. Box 7300, FI-90014 University of Oulu (Finland); Jaervikoski, Timo, E-mail: timo.jarvikoski@oulu.f [Unit of Sociology, University of Oulu, P.O. Box 2000, FI-90014 University of Oulu (Finland)

2010-09-15T23:59:59.000Z

358

Secretary Chu Checks In on Biomass Pilot-Scale Facility | Department of  

Broader source: Energy.gov (indexed) [DOE]

Chu Checks In on Biomass Pilot-Scale Facility Chu Checks In on Biomass Pilot-Scale Facility Secretary Chu Checks In on Biomass Pilot-Scale Facility November 22, 2011 - 10:03am Addthis Secretary Steven Chu visited Kapolei, Hawaii, to check on the process of an integrated biorefinery project awarded $25 million through the Recovery Act to construct the facility. | Image courtesy of the Energy Department. Secretary Steven Chu visited Kapolei, Hawaii, to check on the process of an integrated biorefinery project awarded $25 million through the Recovery Act to construct the facility. | Image courtesy of the Energy Department. Liz Moore Project Manager, Office of Energy Efficiency and Renewable Energy Each biorefinery would: produce as much as 50 million gallons of drop-in green transportation fuels per year

359

Microsoft Word - CX-Redmond-PilotButte-WoodPoleFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Redmond-Pilot Butte No. 1 Wood Pole Replacement Project PP&A Project No.: 2189 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Redmond-Pilot Butte No. 1 transmission line in Deschutes County, Oregon at structures 4/7 and 11/6. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace two deteriorating wood pole structures along its Redmond-Pilot Butte No. 1 230-kV transmission line located in Deschutes County, Oregon. The two structures

360

Property:ProjectTechnology | Open Energy Information  

Open Energy Info (EERE)

ProjectTechnology ProjectTechnology Jump to: navigation, search Property Name ProjectTechnology Property Type Page Has Default form Marine and Hydrokinetic Technology Pages using the property "ProjectTechnology" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + MHK Technologies/Oyster + MHK Projects/ADM 3 + MHK Technologies/Wavebob + MHK Projects/ADM 4 + MHK Technologies/Wavebob + MHK Projects/AW Energy EMEC + MHK Technologies/Wave Roller + MHK Projects/Alaska 35 + MHK Technologies/Ocean +, MHK Technologies/Kensington + MHK Projects/BW2 Tidal + MHK Technologies/RED HAWK + MHK Projects/BioSTREAM Pilot Plant + MHK Technologies/bioSTREAM + MHK Projects/Bluemill Sound + MHK Technologies/Exim + MHK Projects/Bondurant Chute + MHK Technologies/SmarTurbine +

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Shallow Carbon Sequestration Demonstration Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shallow Carbon SequeStration Shallow Carbon SequeStration DemonStration ProjeCt Background The Shallow Carbon Sequestration Pilot Demonstration Project is a cooperative effort involving City Utilities of Springfield (CU); Missouri Department of Natural Resources (MDNR); Missouri State University (MSU); Missouri University of Science & Technology (MS&T); AmerenUE; Aquila, Inc.; Associated Electric Cooperative, Inc.; Empire District Electric Company; and Kansas City Power & Light. The purpose of this project is to assess the feasibility of carbon sequestration at Missouri power plant sites. The six electric utilities involved in the project account for approximately 90 percent of the electric generating capacity in Missouri. Description The pilot demonstration will evaluate the feasibility of utilizing the Lamotte and

362

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

363

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

364

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

365

EA-1642S: Small-Scale Pilot Plant for the Gasification of Coal and  

Broader source: Energy.gov (indexed) [DOE]

642S: Small-Scale Pilot Plant for the Gasification of Coal and 642S: Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, KY EA-1642S: Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, KY SUMMARY This draft Supplemental Environmental Assessment (SEA) analyzes the potential environmental impacts of DOE's proposed action of providing cost-shared funding for the University of Kentucky (UK) Center for Applied Energy Research (CAER) Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis project and of the No-Action Alternative.

366

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network [OSTI]

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

367

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines | Department  

Broader source: Energy.gov (indexed) [DOE]

EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines December 23, 2013 - 12:00pm Addthis Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. The clothing drive’s organizers — Margaret Gee (left), Yolanda Navarrete (center) and Dana Dorr — hold up some of the donated coats before providing them to Carlsbad area schools. Gee is with CBFO and Navarrete and Dorr are with Nuclear Waste Partnership (NWP). NWP's Yolanda Salmon, another drive organizer, is not pictured.

368

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

SciTech Connect (OSTI)

Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

Grace, R. C.; Gifford, J.

2010-01-01T23:59:59.000Z

369

Piloting the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Piloting the Smart Grid Piloting the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Piloting the Smart Grid Focus Area: Crosscutting Topics: Best Practices Website: www.smartgridnews.com/artman/uploads/1/Piloting_the_smart_grid__05-29- Equivalent URI: cleanenergysolutions.org/content/piloting-smart-grid Language: English Policies: "Deployment Programs,Regulations,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: Cost Recovery/Allocation This paper provides guidance regarding when and how Smart Grid piloting studies should be conducted along with examples from several recent pilots that involved dynamic pricing, a key element of the smart grid. Smart Grid

370

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

371

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

372

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

373

AZ CO2 Storage Pilot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Storage Pilot Regional Carbon Sequestration Partnerships Initiative Review Meeting Pittsburgh, Pennsylvania October 7, 2008 John Henry Beyer, Ph.D. WESTCARB Program Manager, Geophysicist 510-486-7954, jhbeyer@lbl.gov Lawrence Berkeley National Laboratory Earth Sciences Division, MS 90-1116 Berkeley, CA 94720 2 WESTCARB region has major CO2 point sources 3 WESTCARB region has many deep saline formations - candidates for CO2 storage WESTCARB also created GIS layers for oil/gas fields and deep coal basins Source: DOE Carbon Sequestration Atlas of the United States and Canada 4 - Aspen Environmental - Bevilacqua-Knight, Inc. Arizona Utilities CO2 Storage Pilot Contracting and Funding Flow Department of Energy National Energy Technology Laboratory Lawrence Berkeley National

374

WRI Pilot Test 2012.pub  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Phase 2: Pilot Test Phase 2: Pilot Test Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Research Brief T he U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) has commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the status of the vehicles and their drivers. It is

375

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

376

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

377

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

378

Potential Economic Impacts of Zebra Mussels on the Hydropower Facilities in the Columbia River Basin  

E-Print Network [OSTI]

was to estimate costs to the Federal Columbia River Power System hydroelectric projects in the event of a zebra found that the one-time cost for installing zebra mussel control systems at hydroelectric projects could hypochlorite (NaOCl) injection system and anti-fouling paint), at 13 select hydroelectric projects, was $23

379

Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems  

SciTech Connect (OSTI)

This document is the final technical report for Cooperative Agreement DE-FC26-04NT41992, 'Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,' which was conducted over the time-period January 1, 2004 through December 31, 2010. The objective of this project has been to demonstrate at pilot scale the use of solid catalysts and/or fixed-structure mercury sorbents to promote the removal of total mercury and oxidation of elemental mercury in flue gas from coal combustion, followed by wet flue gas desulfurization (FGD) to remove the oxidized mercury at high efficiency. The project was co-funded by the U.S. DOE National Energy Technology Laboratory (DOE-NETL), EPRI, Great River Energy (GRE), TXU Energy (now called Luminant), Southern Company, Salt River Project (SRP) and Duke Energy. URS Group was the prime contractor. The mercury control process under development uses fixed-structure sorbents and/or catalysts to promote the removal of total mercury and/or oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone FGD systems. Oxidized mercury not adsorbed is removed in the wet FGD absorbers and leaves with the byproducts from the FGD system. The project has tested candidate materials at pilot scale and in a commercial form, to provide engineering data for future full-scale designs. Pilot-scale catalytic oxidation tests have been completed for periods of approximately 14 to19 months at three sites, with an additional round of pilot-scale fixed-structure sorbent tests being conducted at one of those sites. Additionally, pilot-scale wet FGD tests have been conducted downstream of mercury oxidation catalysts at a total of four sites. The sites include the two of three sites from this project and two sites where catalytic oxidation pilot testing was conducted as part of a previous DOE-NETL project. Pilot-scale wet FGD tests were also conducted at a fifth site, but with no catalyst or fixed-structure mercury sorbent upstream. This final report presents and discusses detailed results from all of these efforts, and makes a number of conclusions about what was learned through these efforts.

Gary Blythe; Conor Braman; Katherine Dombrowski; Tom Machalek

2010-12-31T23:59:59.000Z

380

Renewable Energy Pilot Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Pilot Program Renewable Energy Pilot Program Renewable Energy Pilot Program < Back Eligibility Investor-Owned Utility Rural Electric Cooperative Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Heating & Cooling Wind Program Info State Louisiana Program Type Other Policy Provider Louisiana Public Service Commission In June 2010, the Louisiana Public Service Commission (LPSC) unanimously approved a Renewable Energy Pilot Program for the state. The final implementation plan was adopted in November 2010. The goal of the pilot program is to determine whether a renewable portfolio standard is suitable for Louisiana. The pilot program has two major components: the Research

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is contaminated with small amounts of plutonium and other TRU radioactive elements. Over the next 35 years, WIPP is expected to receive approximately 175,000 cubic meters of waste from various DOE sites. Enforcement September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006

382

International Projects: Food Grant value over $250,000  

E-Print Network [OSTI]

practices and build a sustainable economy. AgShare Open Education Resources is an 18-month pilot projectInternational Projects: Food Grant value over $250,000 College Project Title Department Region, crops and agribusiness COLLEGE OF AGRICULTURE & NATURAL RESOURCES Improving the Inclusiveness

383

Property:Project Nearest Body of Water | Open Energy Information  

Open Energy Info (EERE)

Nearest Body of Water Nearest Body of Water Jump to: navigation, search Property Name Project Nearest Body of Water Property Type String Pages using the property "Project Nearest Body of Water" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + North Atlantic Ocean + MHK Projects/ADM 3 + Galway Bay site close to Spiddal + MHK Projects/ADM 5 + government Pilot Zone + MHK Projects/Algiers Light Project + Mississippi River + MHK Projects/Anconia Point Project + Mississippi River + MHK Projects/Ashley Point Project + Mississippi River + MHK Projects/Astoria Tidal Energy + East River + MHK Projects/Avalon Tidal + Ingram Thorofare + MHK Projects/Avondale Bend Project + Mississippi River + MHK Projects/BW2 Tidal + Maurice River +

384

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

site of a controversial hydropower project sponsored by abilateral funding for hydropower, is included. $1.5 billionits relationship to hydropower in particular. See Leslie

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

385

The Paradox of Regulatory Development in China: The Case of the Electricity Industry  

E-Print Network [OSTI]

of Loss in the Ertan Hydropower Project). ? In Yingxiang17 Due to sensitivity of hydropower performance to seasonalwater resources for future hydropower development. Among 156

Tsai, Chung-min

2010-01-01T23:59:59.000Z

386

Central Valley Salmon: A Perspective on Chinook and Steelhead in the Central Valley of California  

E-Print Network [OSTI]

releases into the river from a hydropower project. Data fromSymposium on small hydropower and fisheries; Bethesda,instream flow needs in hydropower licensing. Palo Alto, CA:

Williams, John G.

2006-01-01T23:59:59.000Z

387

The deployment of urban logistics solutions from research, development and pilot results  

E-Print Network [OSTI]

The deployment of urban logistics solutions from research, development and pilot results Lessons logistics solutions is one of the main pending questions in the field of urban goods transport research demonstration project, this paper presents the main issues related to the deployment of urban logistics

Paris-Sud XI, Université de

388

Enforcement Documents - Waste Isolation Pilot Plant | Department...  

Broader source: Energy.gov (indexed) [DOE]

related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant...

389

Waste Isolation Pilot Plant | Department of Energy  

Office of Environmental Management (EM)

Metal Products, Inc - October 28, 2004 More enforcement documents Oversight Reports April 22, 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013...

390

Independent Oversight Inspection, Waste Isolation Pilot Plant...  

Office of Environmental Management (EM)

Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and...

391

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December 2014 Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows. The Office of Nuclear Safety and...

392

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

393

New Concepts in Fish Ladder Design, Part I of IV, Summary Report, 1982-1984 Final Project Report.  

SciTech Connect (OSTI)

The report looks at the most active periods of fishway research since 1938 as background for a project to apply fundamental fluid and bio-mechanics to fishway design, and develop more cost effective fish passage facilities with primary application to small scale hydropower facilities. Also discussed are new concepts in fishway design, an assessment of fishway development and design, and an analysis of barriers to upstream migration. (ACR)

Orsborn, John F.

1985-08-01T23:59:59.000Z

394

Arsenic pilot plant operation and results:Weatherford, Oklahoma.  

SciTech Connect (OSTI)

Narasimhan Consulting Services, Inc. (NCS), under a contract with the Sandia National Laboratories (SNL), designed and operated pilot scale evaluations of the adsorption and coagulation/filtration treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The pilot evaluation was conducted at Well 30 of the City of Weatherford, OK, which supplies drinking water to a population of more than 10,400. Well water contained arsenic in the range of 16 to 29 ppb during the study. Four commercially available adsorption media were evaluated side by side for a period of three months. Both adsorption and coagulation/filtration effectively reduced arsenic from Well No.30. A preliminary economic analysis indicated that adsorption using an iron oxide media was more cost effective than the coagulation/ filtration technology.

Aragon, Malynda Jo; Arora, H. (Narasimhan Consulting Services Inc., Phoenix, Arizona); Karori, Saqib (Narasimhan Consulting Services Inc., Phoenix, Arizona); Pathan, Sakib (Narasimhan Consulting Services Inc., Phoenix, Arizona)

2007-05-01T23:59:59.000Z

395

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Pilot-Scale Test Results  

SciTech Connect (OSTI)

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, ''Field Testing of a Wet FGD Additive.'' The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemissions of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate that the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project will conduct pilot and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosage requirements to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB co-fired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot and full-scale jet bubbling reactor (JBR) FGD systems to be tested. A third utility, to be named later, will provide the high-sulfur Eastern bituminous coal full-scale FGD test site. Degussa Corporation is providing the TMT-15 additive and technical support to the test program. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High Sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. This topical report presents the results from the Task 2 and Task 4 pilot-scale additive tests. The Task 3 and Task 5 full-scale additive tests will be conducted later in calendar year 2006.

Gary M. Blythe

2006-03-01T23:59:59.000Z

396

OTTER Project Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Field Campaigns > OTTER (Oregon) Field Campaigns > OTTER (Oregon) The Oregon Transect Ecosystem Research (OTTER) Project Overview The purpose of the Oregon Transect Ecosystem Research (OTTER) Project was to estimate major fluxes of carbon, nitrogen, and water in forest ecosystems using an ecosystem-process model driven by remotely sensed data. The project was conducted from 1990 to 1991. The DAAC's data holdings include background data from 1989. OTTER data sets include: Canopy Chemistry Meteorology Field Sunphotometer Airborne Sunphotometer Timber Measurements These data were transferred to the ORNL DAAC from the Ames Research Center node of the Pilot Land Data System (PLDS). The ORNL DAAC LBA Data archive includes 14 data products. Study sites included a coastal forest of western hemlock, sitka spruce, and

397

Hot water geothermal development: opportunities and pilot plant results  

SciTech Connect (OSTI)

It has been projected that up to 11,000 MW of geothermal electric capacity may be on line in the United States by the year 2000. The majority of this capacity will come from hot water geothermal plants, as dry steam resources are limited. Currently, no commercial hot water geothermal capacity exists in the U.S., although, substantial capacity does exist in other countries. Large hot, high temperature resources exist in Southern California's Imperial Valley. Early research work has led to the technical success of a 10 MW unit at Brawley, and to the construction of second generation pilot unit at the Salton Sea resource.

Crane, G.K.

1982-08-01T23:59:59.000Z

398

Hydrologic studies for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The objective of this paper is to provide a general overview of hydrologic conditions at the Waste Isolation Pilot Plant (WIPP) by describing several key hydrologic studies that have been carried out as part of the site characterization program over the last 20 years. The paper is composed of three parts: background information about general objectives of the WIPP project; information about the geologic and hydrologic setting of the facility; and information about three aspects of the hydrologic system that are important to understanding the long-term performance of the WIPP facility. For additional detailed information, the reader is referred to the references cited in the text.

Davies, P.B.

1994-07-01T23:59:59.000Z

399

Energy Efficiency Investments in Public Facilities - Developing a Pilot Mechanism for Russia and Chelyabinsk Region  

SciTech Connect (OSTI)

Russian public sector buildings tend to be very inefficient, which creates vast opportunities for savings. This paper reviews opportunities to implement energy efficiency projects in Russian public buildings, created by new Russian legislation and regulations. Given Russia's limited experience with energy performance contracts (EPCs), a pilot project can help test an implementation mechanism. The authors use Chelyabinsk Region as an example to discuss opportunities, challenges and solutions to financing and implementing an EPC in Russia, navigating through federal requirements and specific local conditions.

Evans, Meredydd; Roshchanka, Volha; Parker, Steven A.; Baranovskiy, Aleksandr

2012-01-01T23:59:59.000Z

400

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

UOP Pilot-Scale Biorefinery  

Broader source: Energy.gov [DOE]

This project by UOP will leverage two commercially proven core technologies, pyrolysis and hydroconversion, into an integrated platform.

402

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

403

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

404

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

405

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

406

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

407

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

408

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

409

Waste Isolation Pilot Plant borehole data  

SciTech Connect (OSTI)

Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable.

NONE

1995-04-01T23:59:59.000Z

410

Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP) Presentation  

Broader source: Energy.gov [DOE]

As a WIPP agency, reporting leveraged dollars is paramount to your entitys success. This webinar will review the WIPP definition and policy, discuss leveraging items you may not have thought possible to claim, and show you ways to calculate accrued leveraged dollars.

411

Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP)  

Broader source: Energy.gov [DOE]

As a WIPP agency, reporting leveraged dollars is paramount to your entitys success. This webinar will review the WIPP definition and policy, discuss leveraging items you may not have thought possible to claim, and show you ways to calculate accrued leveraged dollars.

412

Los Angeles Air Force Base Vehicle to Grid Pilot Project  

E-Print Network [OSTI]

viability of a complex new technology as being demonstratedEnvironmental Energy Technologies Division to be presentedand Energy, Traffic Technology International, Feb-Mar 2009.

Marnay, Chris

2014-01-01T23:59:59.000Z

413

EAST TEXAS FOREST INVENTORY (ETFI) PILOT PROJECT REMOTE SENSING PHASE  

E-Print Network [OSTI]

Resources Institute Arthur Temple College of Forestry Stephen F. Austin State University Nacogdoches, Texas; and (2) proper forest resource assessment is crucial to the economic development and sustainability

Hung, I-Kuai

414

Los Angeles Air Force Base Vehicle to Grid Pilot Project  

E-Print Network [OSTI]

for the imbalance energy market or contingencies only.competitive markets for trading energy and each of its AS.potential market revenues will trump high energy costs in

Marnay, Chris

2014-01-01T23:59:59.000Z

415

Pilot Project for Fixed Segmentation of the Pavement Network  

E-Print Network [OSTI]

Road DIXON AVENUE/GRANT ROAD Midway Meridian Leisure TownRoad DIXON AVENUE/GRANT ROAD Midway Meridian Leisure TownRoad DIXON AVENUE/GRANT ROAD Midway Meridian Leisure Town

Kohler, Erwin R.; Santero, Nicholas J.; Harvey, John T

2005-01-01T23:59:59.000Z

416

Retro-Commissioning Sensor Suitcase Commercialization Pilot Project  

Broader source: Energy.gov [DOE]

Lead Performers: -- Pacific Northwest National Laboratory Richland, WA -- Lawrence Berkeley National Laboratory Berkeley, CA -- Oak Ridge National Laboratory Oak Ridge, TN

417

Leveraging Resources for Weatherization Innovation Pilot Projects (WIPP)  

Broader source: Energy.gov [DOE]

Webinar explaining how to capture and report non-federally funded leveraged resources such as volunteer training, tools and mileage, donated materials, and reception or outreach hours.

418

Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project  

Broader source: Energy.gov [DOE]

2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

419

Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project  

Broader source: Energy.gov [DOE]

2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

420

2014 call for NERSC's Data Intensive Computing Pilot Program...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC's Data Intensive Computing Pilot Program 2014 call for NERSC's Data Intensive Computing Pilot Program Due December 10 November 18, 2013 by Francesca Verdier (0 Comments)...

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Results from Beyond Design Basis Event Pilots | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Results from Beyond Design Basis Event Pilots Results from Beyond Design Basis Event Pilots September 19, 2012 Presenter: Mike Hillman, Program Manager, Office of Health, Safety...

422

Carbon Fiber Pilot Plant and Research Facilities | Department...  

Broader source: Energy.gov (indexed) [DOE]

Pilot Plant and Research Facilities Carbon Fiber Pilot Plant and Research Facilities 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation...

423

ENERGY STAR Appliance Verification Testing - Pilot Program Summary...  

Broader source: Energy.gov (indexed) [DOE]

Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3,...

424

Sandia National Laboratories: Waste Isolation Pilot Plant Accident...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyComputational Modeling & SimulationWaste Isolation Pilot Plant Accident Investigation Analysis Support Waste Isolation Pilot Plant Accident Investigation Analysis...

425

Federal Technology Deployment Pilot: Exterior Solid State Lighting...  

Energy Savers [EERE]

Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal Utility...

426

Waste Isolation Pilot Plant, National Transuranic Program Have...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 Waste Isolation Pilot Plant, National Transuranic Program Have Banner Year in 2013 December 24,...

427

San Diego Hero Alliance: Community-Based Social Marketing Pilot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

San Diego Hero Alliance: Community-Based Social Marketing Pilot Program San Diego Hero Alliance: Community-Based Social Marketing Pilot Program Presents an overview of the...

428

Full-energy-chain greenhouse-gas emissions: a comparison between nuclear power, hydropower, solar power and wind power  

Science Journals Connector (OSTI)

Fair comparison of the climate impacts from different energy sources can be made only by accounting for the emissions of all relevant greenhouse gases (GHGs) from the full energy chain (FENCH) of the energy sources. FENCH-GHG emission factors of most of the non-fossil fuel energies are lower than those of the fossil fuels that are in the range of 500-1200 g CO2/kW h(e). The improvement rates concerning their CO2-to-energy ratios of OECD countries and some developing countries are discussed, showing the low performance of the latter from 1965-1996. Detailed FENCH-GHG systems analyses are given for nuclear power, hydropower, and wind and solar power. The FENCH-GHG emission factor of nuclear power is 8.9 g CO2-equiv./kW h(e) and applies to light-water nuclear power plants. The main contributions are from milling, conversion of lower-grade ore, enrichment, construction and operation of the power plant, and reprocessing (if relevant). For hydropower an emission factor is reported of 16 g CO2-equiv./kW h(e) for the best investigated flat-area cold climate power plants. The main, biogenic, emission source is the water reservoir. The information on high-altitude alpine reservoir-type and run-of- river hydropower generation is limited. These plants could probably have emission factors in the low range of 5-10 g CO2-equiv./kW h(e). The FENCH CO2-equivalent emission factors of wind power systems are in the order of 15 g CO2-equiv./kW h(e). The main source is associated with the materials for the turbine and for its foundation. Solar PV and solar thermal power are in an intermediate range their current values are 100-200 and 50-80g CO2-equiv./kW h(e), respectively. GHG emissions are mainly from silicon, which dominates the PV market.

Joop F. van de Vate

2002-01-01T23:59:59.000Z

429

Pilot tests guide VOC control choice  

SciTech Connect (OSTI)

On-site pilot testing determines proper operating conditions for catalysts of pollution control equipment at optimum performance levels while demonstrating their ability to reduce emissions, odors and opacity from stack gases in manufacturing processes. Examples are provided ofr the catalytic control of emissions from coffee roasting, carbon fiber manufacturing, and can coating. Portable oxidizer units are employed in the pilot testing.

Van Benschoten, D.M. [Johnson Matthey Environmental Products, Wayne, PA (United States)

1993-10-01T23:59:59.000Z

430

Prediction of ungauged river basin for hydropower potential and flood risk mitigation: a case study at Gin River, Sri Lanka  

Science Journals Connector (OSTI)

A hydrologic study was performed for ungauged river basin of Sri Lanka to examine synthetic discharge relations. Rainfall-runoff relationships were used for identifying hydrological conditions of the Gin River basin. The peak discharge achieves within 4.74 hours from the onset of the rainstorm and 11.95 hours take to reach its normal discharge conditions. Stream frequency of the Gin River is 4.56 junctions/km while the channel slope gradient is 7.90 m/km. The regional coefficient of the catchment is 0.00296. Higher stream frequency and gentle channel slope were identified as flood triggering factors of the basin. Mini-hydropower systems were recognised as the most applicable and economical flood controlling hydraulic structures. Also, it can be utilised as a reliable energy source (8,630.0 kW).

A.S. Ratnayake; A. Pitawala

2014-01-01T23:59:59.000Z

431

Solazyme Pilot-Scale Biorefinery  

Broader source: Energy.gov (indexed) [DOE]

SzIBR will demonstrate integrated scale-up of Solazyme's novel heterotrophic algal oil biomanufacturing process, validate the projected commercial-scale economics of...

432

Microsoft Word - CX-PilotButte-LaPineWoodPoleFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

30, 2012 30, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pilot Butte-La Pine No. 1 Wood Pole Replacement Project PP&A Project No.: 2188 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities ... include ... replacement of wood poles. Location: Pilot Butte-La Pine No. 1 transmission line located in Deschutes County, Oregon, at the following structures: Mile Structure 5 7 6 5 7 4 16 7 16 8 17 5 18 1 18 3 21 3 21 8 25 3 30 5 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace 12 deteriorating wood pole

433

NETL: Pilot Test of a Nanoporous, Super-hydrophobic Membrane Contactor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pilot Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-combustion CO2 Capture Pilot Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-combustion CO2 Capture Project No.: DE-FE00013123 SRI is incorporating an advanced carbon capture sorbent-based process in a 1 MWe slipstream pilot plant that will reduce the parasitic plant load by using a CO2 capture sorbent requiring a reduced amount of steam. The process is based on advanced carbon sorbents having a low heat of adsorption, high CO2 adsorption capacity, and excellent selectivity. Design and performance data will be produced by testing the sorbent using the slipstream from an operating pulverized coal (PC)-fired boiler under realistic conditions and continuous long-term operation. The acquired data will be used for further development and commercialization of the process.

434

Waste Isolation Pilot Plant Activites  

Broader source: Energy.gov (indexed) [DOE]

DENVER, CO DENVER, CO WASTE ISOLATION PILOT PLANT ACTIVITIES ACTIVITIES O.W. EATON MANAGER, EXTERNAL EMERGENCY MANAGEMENT OPENING OF NEW ROUTES COMPLIANCE WITH PUBLIC LAW 102 579 WIPP LANDWITHDRAWL 102-579 WIPP LANDWITHDRAWL ACT OF 1992 1082 EMERGENCY PERSONNEL TRAINED IN 2010 *MERRTT 1082 EMERGENCY PERSONNEL TRAINED IN 2010 MERRTT *INCIDENT COMMAND SYSTEM *HOSPITAL PREPAREDNESS *HOSPITAL PREPAREDNESS *MEDICAL EXAMINER DISPATCHER (BETA) *DISPATCHER (BETA) RADIOLOGICAL TRAINING RADIOLOGICAL TRAINING FOR FOR FOR FOR HOSPITAL PERSONNEL HOSPITAL PERSONNEL Based on FEMA Course G-346 iNTRODUCTION 4 Hazardous Materials Accidents Part 1 WIPP EXTERNAL EMERGENCY MANAGEMENT EXERCISES CONDUCTED E ercise Location Date Exercise Location Date TRANSAX 90 Colorado Springs, Colorado November 8, 1990 1

435

Better Plants Water Pilot- Overview  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is expanding the Better Buildings Challenge to help partners demonstrate successful approaches to saving water and decrease their utility bills. The commercial and industrial sectors account for more than 25 percent of the withdrawals from public water supplies and many organizations in these sectors may have savings opportunities of 20 to 40%. The efficient use of water resources results in lower operating costs, a more reliable water supply, and improved water quality. Additionally, because energy is required to transport and treat water, saving water also saves energy. Through this pilot, DOE will work with a small, diverse group of Better Buildings Challenge Partners to expand their resource management strategies to include water in addition to energy, set water savings goals, track progress and showcase solutions.

436

GENETIC ALGORITHMS FOR A SINGLE-TRACK VEHICLE AUTONOMOUS PILOT  

E-Print Network [OSTI]

GENETIC ALGORITHMS FOR A SINGLE-TRACK VEHICLE AUTONOMOUS PILOT Dana Vrajitoru Intelligent Systems algorithms to an autonomous pilot designed for motorized single-track vehicles (motorcycles). The pilot contribute efficiently to configuring the autonomous pilot. Key Words Genetic algorithms, multi

Vrajitoru, Dana

437

Pilot test specific test plan for the removal of arsenic Socorro, New Mexico.  

SciTech Connect (OSTI)

Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative drinking water treatment technologies designed to meet the new arsenic maximum contaminant level (MCL) of 10 {micro}g/L (effective January 2006). As currently envisioned, pilots tests may include multiple phases. Phase I tests will involve side-by-side comparisons of several commercial technologies primarily using design parameters suggested by the Vendors. Subsequent tests (Phase II) may involve repeating some of the original tests, testing the same commercial technologies under different conditions and testing experimental technologies or additional commercial technologies. This Pilot Test Specific Test Plan (PTSTP) was written for Phase I of the Socorro Springs Pilot. The objectives of Phase I include evaluation of the treatment performance of five adsorptive media under ambient pH conditions (approximately 8.0) and assessment of the effect of contact time on the performance of one of the media. Addenda to the PTSTP may be written to cover Phase II studies and supporting laboratory studies. The Phase I demonstration began in the winter of 2004 and will last approximately 9 months. The information from the test will help the City of Socorro choose the best arsenic treatment technology for the Socorro Springs well. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association (AWWA) Research Foundation, SNL, and WERC (A Consortium for Environmental Education and Technology Development).

Collins, Sue S.; Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Aragon, Alicia R.; Dwyer, Brian P.; Marbury, Justin Luke

2006-03-01T23:59:59.000Z

438

Waste Isolation Pilot Plant - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Waste Isolation Pilot Plant Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant, September 8, 2006 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to Radiological Uptakes at the Mobile Visual Examination and Repackaging Facility at Lawrence Livermore National Laboratory, December 22, 2005 (EA-2005-08) - Washington TRU Solutions, LLC - Press Release, December 22, 2005 Enforcement Letter issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant, October 28, 2004

439

Construction Project Safety and Health Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

440

Nortel CallPilot A-Style Command Comparison Card  

Broader source: Energy.gov (indexed) [DOE]

Welcome to CallPilot. This card helps you to learn CallPilot by showing you the key differences between Welcome to CallPilot. This card helps you to learn CallPilot by showing you the key differences between CallPilot and your previous messaging system. For example, in CallPilot, you don't need a main menu. When you log in, you are at your first new message right away. To play your messages, compose new messages, or change mailbox settings, you use standard commands that are common to all features. Prompts guide you whenever you pause, and Help is always there when you need it - just press *. For further information, refer to the CallPilot Multimedia Messaging User Guide. Features CallPilot Previous system These keypad diagrams show the frequently used message commands in CallPilot and your previous system. In CallPilot, the following commands are

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Oversight Reports - Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant Oversight Reports - Waste Isolation Pilot Plant April 22, 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities November 28, 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant September 28, 2011 Independent Activity Report, Waste Isolation Pilot Plant - September 2011 Orientation Visit to the Waste Isolation Pilot Plant [HIAR-WIPP-2011-09-07] October 2, 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Inspection of Environment, Safety, and Health and Emergency Management at

442

Alternative Fuels Data Center: School Bus Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

School Bus Pilot School Bus Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Pilot Program The Vermont Department of Motor Vehicles will approve up to three participants for a pilot program to operate Type II school buses that are

443

Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.  

SciTech Connect (OSTI)

The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

2009-01-01T23:59:59.000Z

444

Cleveland EnergySaver Pilot Program (From Pilot to Permanent Program)  

Broader source: Energy.gov [DOE]

Provides an overview of the Cleveland EnergySaver Pilot Program aimed at reducing barriers to widespread adoption of residential energy efficient retrofits.

445

Journey to Leadership Certificate Program (Pilot)  

Broader source: Energy.gov [DOE]

The Office of Learning and Workforce Development is pleased to announce a pilot training program for DOE entry-level professionals. The program orientation is scheduled for June 4, 2014.For Entry...

446

PRELIMINARY EVALUATION OF PILOT PERFORMANCE-BASED  

E-Print Network [OSTI]

...................................................................................................................................5 History of the Energy Commission's PBI Program and Its DevelopmentCALIFORNIA ENERGY COMMISSION PRELIMINARY EVALUATION OF PILOT PERFORMANCE-BASED INCENTIVE PROGRAM STAFFREPORT SEPTEMBER 2007 CEC-300-2007-011 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION

447

Funding Opportunity Announcement: Weatherization Innovation Pilot Program  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program Funding Opportunity Announcement DE-FOA-00000309 dealing with the Weatherization Innovation Pilot Program.

448

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

449

Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report  

SciTech Connect (OSTI)

This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of <65 ft and the capacity to generate hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

Rinehart, B.N.

1991-06-01T23:59:59.000Z

450

ERCOT's Weather Sensitive Demand Response Pilot  

E-Print Network [OSTI]

ERCOTs Weather Sensitive Demand Response Pilot CATEE 12-17-13 ESL-KT-13-12-21 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Disclaimer The information contained in this report has been obtained from... Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Weather Sensitive Loads Pilot CATEE 121313 - Tim Carter 713-646-5476 tim.carter@constellation.com4 Constellation's Integrated Power Products 2013. Constellation Energy Resources, LLC...

Carter, T.

2013-01-01T23:59:59.000Z

451

Stakeholder Engagement and Outreach: Wind for Schools Project  

Wind Powering America (EERE)

Participant Roles & Responsibilities Affiliate Projects Pilot Project Results Project Funding Collegiate Wind Competition School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Wind for Schools Project As the United States dramatically expands wind energy deployment, the industry is challenged with developing a skilled workforce and addressing public resistance. To address these issues, Wind Powering America launched the Wind for Schools project in 2005 by conducting a pilot project in Colorado that resulted in one small wind turbine installation in Walsenburg. The program has ended, but by the end of September 2013: Wind for Schools Portal on OpenEI Visit the OpenEI Wind for Schools Portal to access data from turbines at

452

HUD PowerSaver Pilot Loan Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HUD PowerSaver Pilot Loan Program HUD PowerSaver Pilot Loan Program Title HUD PowerSaver Pilot Loan Program Publication Type Policy Brief Authors Zimring, Mark, Ian M. Hoffman, and Merrian C. Fuller Tertiary Authors Borgeson, Merrian Secondary Title Clean Energy Program Policy Brief Publisher LBNL Place Published Berkeley Year of Publication 2010 Pagination 6 Date Published 12/2010 Abstract The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program is not capped. The Federal Housing Administration (FHA), HUD"s mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.

453

Draft forecast of the final report for the comparison to 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The United States Department of Energy is planning to dispose of transuranic wastes, which have been generated by defense programs, at the Waste Isolation Pilot Plant. The WIPP Project will assess compliance with the requirements of the United States Environmental Protection Agency. This report forecasts the planned 1992 document, Comparison to 40 CFR, Part 191, Subpart B, for the Waste Isolation Pilot Plant (WIPP). 130 refs., 36 figs., 11 tabs.

Bertram-Howery, S.G.; Marietta, M.G.; Anderson, D.R.; Gomez, L.S.; Rechard, R.P. (Sandia National Labs., Albuquerque, NM (USA)); Brinster, K.F.; Guzowski, R.V. (Science Applications International Corp., Albuquerque, NM (USA))

1989-12-01T23:59:59.000Z

454

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #26, January - March 2010  

SciTech Connect (OSTI)

January-March, 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: understanding and improving sugar measurements in biomass hydrolysates; expansion of the NREL/DOE Biochemical Pilot Plant.

Schell, D.

2010-04-01T23:59:59.000Z

455

Microsoft Word - CX-PilotButte-LaPine-WoodPoles-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacements on Bonneville Power Administration's (BPA) Pilot Butte-La Pine No. 1 transmission line PP&A Project No.: 2484 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance Location: Deschutes County, Oregon, at the following structures: Mile Structure 3 1 3 2 7 3 7 5 9 2 11 3 13 5 13 8 14 1 15 1 16 3 16 5 21 7 21 9 22 2 22 4 22 5 23 5 27 2 Proposed by: BPA Description of the Proposed Action: BPA is proposing to replace 19 deteriorating wood pole structures along its Pilot Butte-La Pine No. 1, 230-kilovolt transmission line located in Deschutes County, Oregon. The 19 structures

456

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use  

SciTech Connect (OSTI)

A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8" CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

Wiehagen, J.; Del Bianco, M.; Wood, A.

2013-02-01T23:59:59.000Z

457

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

458

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

459

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

460

National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island (Fact Sheet)  

SciTech Connect (OSTI)

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent "package" of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach to implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

Not Available

2014-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Performance Results for Massachusetts and Rhode Island Deep Energy Retrofit Pilot Community  

SciTech Connect (OSTI)

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent 'package' of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach to implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

Gates, C.; Neuhauser, K.

2014-03-01T23:59:59.000Z

462

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

463

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

464

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

465

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

466

Weatherization Innovation Pilot Program (WIPP): Technical Assistance Summary  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Programs Office (WIPO) launched the Weatherization Innovation Pilot Program (WIPP) to accelerate innovations in whole-house weatherization and advance DOE's goal of increasing the energy efficiency and health and safety of low-income residences without the utilization of additional taxpayer funding. Sixteen WIPP grantees were awarded a total of $30 million in Weatherization Assistance Program (WAP) funds in September 2010. These projects focused on: including nontraditional partners in weatherization service delivery; leveraging significant non-federal funding; and improving the effectiveness of low-income weatherization through the use of new materials, technologies, behavior-change models, and processes.

Hollander, A.

2014-09-01T23:59:59.000Z

467

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

468

Carbon Capture Pilots (Kentucky) | Open Energy Information  

Open Energy Info (EERE)

Pilots (Kentucky) Pilots (Kentucky) No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Last modified on February 12, 2013. EZFeed Policy Place Kentucky Name Carbon Capture Pilots (Kentucky) Policy Category Other Policy Policy Type Industry Recruitment/Support Affected Technologies Coal with CCS Active Policy Yes Implementing Sector State/Province Primary Website http://energy.ky.gov/carbon/Pages/default.aspx Summary Support for the Carbon Management Research Group (CMRG), a public/private partnership consisting of most of the Commonwealth's utilities, the Electric Power Research Institute, the Center for Applied Energy Research (CAER), and the Department for Energy Development and Independence (DEDI),

469

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation | Department  

Broader source: Energy.gov (indexed) [DOE]

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation The Brattle Group was retained by Baltimore Gas & Electric Company (BGE) in December 2006 to assist in the design of a dynamic pricing pilot program to develop assessments of the likely impact of a variety of dynamic pricing programs on BGE residential customer load shapes. The residential pilot program, Smart Energy Pricing (SEP) Pilot, was subsequently approved by the Maryland Public Service Commission and successfully implemented in the summer of 2008. This report presents the results from the impact evaluation of the BGE's SEP Pilot in the summer of 2008. BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation More Documents & Publications

470

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation | Department  

Broader source: Energy.gov (indexed) [DOE]

BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation The Brattle Group was retained by Baltimore Gas & Electric Company (BGE) in December 2006 to assist in the design of a dynamic pricing pilot program to develop assessments of the likely impact of a variety of dynamic pricing programs on BGE residential customer load shapes. The residential pilot program, Smart Energy Pricing (SEP) Pilot, was subsequently approved by the Maryland Public Service Commission and successfully implemented in the summer of 2008. This report presents the results from the impact evaluation of the BGE's SEP Pilot in the summer of 2008. BGE's Smart Energy Pricing Pilot Summer 2008 Impact Evaluation More Documents & Publications

471

Underground Salt Haul Truck Fire at the Waste Isolation Pilot...  

Office of Environmental Management (EM)

Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 March 2014 Salt Haul Truck Fire at the Waste Isolation Pilot Plant Salt Haul Truck Fire at the...

472

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

473

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

474

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

475

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

476

Laboratory and pilot field-scale testing of surfactants for environmental restoration of chlorinated solvent DNAPLs  

SciTech Connect (OSTI)

This project is composed of two phases and has the objective of demonstrating surfactant-enhanced aquifer remediation (SEAR) as a practical remediation technology at DOE sites with ground water contaminated by dense, non-aqueous phase liquids (DNAPLs), in particular, chlorinated solvents. The first phase of this project, Laboratory and Pilot Field Scale Testing, which is the subject of the work so far, involves (1) laboratory experiments to examine the solubilization of multiple component DNAPLs, e.g., solvents such as perchloroethylene (PCE) and trichloroethylene (TCE), by dilute surfactant solutions, and (2) a field test to demonstrate SEAR technology on a small scale and in an existing well.

Jackson, R.E. [INTERA, Inc., Austin, TX (United States); Fountain, J.C. [State Univ. of New York, Buffalo, NY (United States)

1994-12-31T23:59:59.000Z

477

Home Energy Score Post-Pilot Update Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Home Energy Score Post-Pilot Update, presented in September 2011.

478

Childhood Lead Poisoning Prevention Program Community Awareness Pilot  

E-Print Network [OSTI]

Childhood Lead Poisoning Prevention Program Community Awareness Pilot #12;1 THE GOOD NEWS- Exposure solder, and brass faucets). A

479

Enterprise Assessments Review, Waste Isolation Pilot Plant December 2014  

Broader source: Energy.gov [DOE]

Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows

480

10 MWe Solar Thermal Central Receiver Pilot Plant Heliostat Evaluation  

Science Journals Connector (OSTI)

Sandia is responsible for evaluating the heliostats at the 10 MWe Solar Thermal Central Receiver Pilot Plant in Barstow, California...

C. L. Mavis; J. J. Bartel

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower project pilot" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIS-0026: Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico  

Broader source: Energy.gov [DOE]

The Office of Environmental Restoration and Waste Management prepared this EIS for the Waste Isolation Pilot Plant.

482

Mastering the pilot domestic binary combined-cycle plants  

Science Journals Connector (OSTI)

Results are presented from mastering the pilot binary combined-cycle plants of Type PGU-450T (installed at...

Yu. A. Radin

2006-07-01T23:59:59.000Z

483

Analysis of Pump-Turbine S Instability and Reverse Waterhammer Incidents in Hydropower Systems  

SciTech Connect (OSTI)

Hydraulic systems continually experience dynamic transients or oscillations which threaten the hydroelectric plant from extreme water hammer pressures or resonance. In particular, the minimum pressure variations downstream of the turbine runner during the load rejection or other events may cause dangerous water column separation and subsequent rejoinder. Water column separation can be easily observed from the measurements of site transient tests, and has indeed caused serious historical damages to the machine and water conveyance system. Several technical issues regarding water column separation in draft tubes, including S instability of turbine characteristic curves, numerical instability and uncertainty of computer programs, are discussed here through case studies and available model and site test data. Catastrophic accidents experienced at a Kaplan turbine and in a long tailrace tunnel project, as well as other troubles detected in a more timely fashion, are revisited in order to demonstrate the severity of reverse water hammer. However, as there is no simple design solutions for such complex systems, this paper emphasizes that the design of hydraulic systems is always difficult, difficulties that are compounded when the phenomena in question are non-linear (water hammer), dynamic (involving wave interaction and complex devices of turbines, controls, and electrical systems), and non-monotonic (severity of response is seldom simply connected to severity of load as with vibrations and resonance, and the complexity of transient loads), and thus may lead to high economic and safety challenges and consequences.

Pejovic, Dr. Stanislav [University of Toronto] [University of Toronto; Zhang, Qin Fen [ORNL] [ORNL; Karney, Professor Byran W. [University of Toronto] [University of Toronto; Gajic, Prof. Aleksandar [University of Belgrade, Belgrade, Serbia] [University of Belgrade, Belgrade, Serbia

2011-01-01T23:59:59.000Z

484

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

485

TidGen Power System Commercialization Project  

SciTech Connect (OSTI)

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPCs tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

Sauer, Christopher R. [President & CEO] [President & CEO; McEntee, Jarlath [VP Engineering & CTO] [VP Engineering & CTO

2013-12-30T23:59:59.000Z

486

New Summer Pilot Course 2013 Biodiversity Informatics  

E-Print Network [OSTI]

to advanced under- graduates and graduate students interested in biodiversity, conservation biology, dataNew Summer Pilot Course ­ 2013 Biodiversity Informatics (BIO 494 / BIO 598 ­ 2 Credits) June 17 Franz, David Patterson, Ed Gilbert Contact nico.franz@asu.edu for additional information Biodiversity

Franz, Nico M.

487

A Pilot Plant: The Fastest Path to  

E-Print Network [OSTI]

Key Science Needs for a Technically Sound MFE Pilot Plant Design Integrated Plasma Material Interface Plant Design? (2) Integrated Plasma-Materials Interface · High heat and particle flux and fluence · What seconds in 2028. The MFE Program Needs to Move Faster Implications Building a Component Test Facility

488

Argonne National Laboratory's Recycling Pilot Plant  

ScienceCinema (OSTI)

Argonne has a Recycling Pilot Plant designed to save the non-metal portions of junked cars. Here, program managers demonstrate how plastic shredder residue can be recycled. (Currently these automotive leftovers are sent to landfills.) For more information, visit Argonne's Transportation Technology R&D Center Web site at http://www.transportation.anl.gov.

Spangenberger, Jeff; Jody, Sam;

2013-04-19T23:59:59.000Z

489

Intro to NREL's Thermochemical Pilot Plant  

ScienceCinema (OSTI)

NREL's Thermochemical Pilot Plant converts biomass into higher hydrocarbon fuels and chemicals.NREL is researching biomass pyrolysis. The lab is examining how to upgrade bio-oils via stabilization. Along with this, NREL is developing the engineering system requirements for producing these fuels and chemicals at larger scales.

Magrini, Kim

2014-06-10T23:59:59.000Z

490

Enforcement Documents - Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Enforcement Documents - Waste Isolation Pilot Plant September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant August 30, 2004 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC,

491

Grandson of Enola Gay pilot gives 70th anniversary lecture  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grandson of Enola Gay pilot gives lecture Grandson of Enola Gay pilot gives lecture Grandson of Enola Gay pilot gives 70th anniversary lecture Col. Paul Tibbets IV, grandson of Enola Gay pilot Paul W. Tibbets Jr., talks about his grandfather and his experiences as a U.S. Air Force pilot flying B-1 and B-2 bombers. April 3, 2013 Col. Paul Tibbets IV, right, sits in the cockpit of "Fifi," a B-29 bomber, with his grandfather and Enola Gay pilot Paul W. Tibbets Jr., in this October 1998 photo taken in Midland, Texas. Col. Paul Tibbets IV, right, sits in the cockpit of "Fifi," a B-29 bomber, with his grandfather and Enola Gay pilot Paul W. Tibbets Jr., in this October 1998 photo taken in Midland, Texas. Contact Steve Sandoval Communications Office (505) 665-9206 Email Paul Tibbets IV is commander of the Air Force Inspection Agency at Kirtland

492

Smart Metering Pilot Program Inc SMPPI | Open Energy Information  

Open Energy Info (EERE)

Metering Pilot Program Inc SMPPI Metering Pilot Program Inc SMPPI Jump to: navigation, search Name Smart Metering Pilot Program, Inc. (SMPPI) Place Washington, DC Product SMPPI is a non-profit corporation composed of representatives of Pepco, the D.C. Public Service Commission, the D.C. Office of People's Counsel, the D.C. Consumer Utility Board, and the International Brotherhood of Electrical Workers Local 1900. References Smart Metering Pilot Program, Inc. (SMPPI)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Smart Metering Pilot Program, Inc. (SMPPI) is a company located in Washington, DC . References ↑ "Smart Metering Pilot Program, Inc. (SMPPI)" Retrieved from "http://en.openei.org/w/index.php?title=Smart_Metering_Pilot_Program_Inc_SMPPI&oldid=351192"

493

Home Energy Score Pilot Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Energy Score Pilot Summaries Home Energy Score Pilot Summaries Home Energy Score Pilot Summaries The U.S. Department of Energy (DOE) partnered with counties, utilities, and non-profit organizations ("Pilots") across the country to test and evaluate the Home Energy Score from November 2010 through July 2011. Through these Pilots, DOE tested a wide range of issues associated with the program and the associated software, the Home Energy Scoring Tool, including: How homeowners responded to the Home Energy Score and process Training of the home energy assessors and reaction to the Scoring Tool Methods to conduct Quality Assurance Climatic sensitivity of the Home Energy Scoring Tool The Pilots were spread out across varied climates, represented most U.S. regions, and included both urban and rural communities. DOE and the Pilots

494

Commercial Building Energy Asset Score 2013 Pilot | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2013 Pilot 2013 Pilot Commercial Building Energy Asset Score 2013 Pilot DOE conducted its first pilot test of the Asset Score in 2012. Findings from that pilot have led to improvements in the overall program and the Asset Scoring Tool. The current program includes the following new features: Enhanced Asset Scoring Tool capabilities, including the ability to score complex buildings and the following building types: multifamily, lodging, libraries, court houses and mixed use. Retail, office, schools, and unrefrigerated warehouses were part of the 2012 Pilot and will continue to be included in the 2013 Pilot. Improved usability, including clearer input definitions, an enhanced user interface, and the ability for multiple users to edit one building Reduced data requirements to generate a simple Asset Score

495

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

SciTech Connect (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

496

Summary of scientific investigations for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The scientific issues concerning disposal of radioactive wastes in salt formations have received 40 years of attention since the National Academy of Sciences (NAS) first addressed this issue in the mid-50s. For the last 21 years, Sandia National Laboratories (SNL) have directed site specific studies for the Waste Isolation Pilot Plant (WIPP). This paper will focus primarily on the WIPP scientific studies now in their concluding stages, the major scientific controversies regarding the site, and some of the surprises encountered during the course of these scientific investigations. The WIPP project`s present understanding of the scientific processes involved continues to support the site as a satisfactory, safe location for the disposal of defense-related transuranic waste and one which will be shown to be in compliance with Environmental Protection Agency (EPA) standards. Compliance will be evaluated by incorporating data from these experiments into Performance Assessment (PA) models developed to describe the physical and chemical processes that could occur at the WIPP during the next 10,000 years under a variety of scenarios. The resulting compliance document is scheduled to be presented to the EPA in October 1996 and all relevant information from scientific studies will be included in this application and the supporting analyses. Studies supporting this compliance application conclude the major period of scientific investigation for the WIPP. Further studies will be of a ``confirmatory`` and monitoring nature.

Weart, W.D.

1996-02-01T23:59:59.000Z

497

Pilot Phase of a Field Study to Determine Waste of Water and Energy in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Phase of a Field Study to Determine Waste of Water and Energy in Phase of a Field Study to Determine Waste of Water and Energy in Residential Hot-Water Distribution Systems Title Pilot Phase of a Field Study to Determine Waste of Water and Energy in Residential Hot-Water Distribution Systems Publication Type Report LBNL Report Number LBNL-4985E Year of Publication 2011 Authors Lutz, James D., Peter J. Biermayer, and Derek A. King Subsidiary Authors Energy Analysis Department Document Number LBNL-4985E Pagination 29 Date Published January 1 Publisher Lawrence Berkeley National Laboratory City Berkeley ISBN Number LBNL-4985E Abstract This paper provides an overview of the pilot phase of a field study to determine the feasibility of a method of directly measuring the waste of water and energy caused by current hot water distribution systems (HWDS) in California residences using wireless sensor network technologies. The experience gained in the pilot phase study using wireless sensor networks demonstrates that it is clearly feasible to use this technology for measuring water and gas flows and temperatures.The goal was to demonstrate a method to reliably collect water flow and temperature data from every indoorhot water end use point, at the water heater in one second intervals when water was flowing. The overall success of the pilot phase study indicates that this technique can work. However, the pilot phase study did reveal shortcomings in many areas. The recommendations in this paper address those shortcomings and provide ways to improve the outcomes of any follow-on field study. The project's tasks were to test and evaluate the proposed hardware, installation protocols, data collection, and processing procedures. The techniques developed in this project provide a way to accurately measure temperature and flow of indoor water use events at one second resolution. The technologies used in this pilot phase study are viable for use in a larger field study to determine the energy and water efficiency of hot water distribution systems in California homes. The lessons learned from this experience will improve procedures, programming and wireless sensor network specifications.

498

Lung cancer in uranium miners: A tissue resource and pilot study. Final performance report  

SciTech Connect (OSTI)

This project incorporates two related research projects directed toward understanding respiratory carcinogenesis in radon-exposed former uranium miners. The first project involved a continuation of the tissue resource of lung cancer cases from former underground uranium miners and comparison cases from non-miners. The second project was a pilot study for a proposed longitudinal study of respiratory carcinogenesis in former uranium miners. The objectives including facilitating the investigation of molecular changes in radon exposed lung cancer cases, developing methods for prospectively studying clinical, cytologic, cytogenetic, and molecular changes in the multi-event process of respiratory carcinogenesis, and assessing the feasibility of recruiting former uranium miners into a longitudinal study that collected multiple biological specimens. A pilot study was conducted to determine whether blood collection, induced sputum, bronchial brushing, washings, and mucosal biopsies from participants at two of the hospitals could be included efficiently. A questionnaire was developed for the extended study and all protocols for specimen collection and tissue handling were completed. Resource utilization is in progress at ITRI and the methods have been developed to study molecular and cellular changes in exfoliated cells contained in sputum as well as susceptibility factors.

Samet, J.; Gilliland, F.D.

1998-08-13T23:59:59.000Z

499

Science Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

500

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht