Powered by Deep Web Technologies
Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Hydropower to Hydrogen: Feasibility Study  

Science Conference Proceedings (OSTI)

Hydrogen is being considered as a transportation fuel of the future due to its abundance in nature and the many different methods available to produce it. Hydrogen is also the cleanest burning of all fuels available today. However, there is limited infrastructure available to support the use of hydrogen as an alternative fuel for land transportation. In order to promote hydrogen as an alternative transportation fuel, the New York Power Authority (NYPA) commissioned EPRI/Nexant to conduct a feasibility st...

2007-06-13T23:59:59.000Z

2

Joint irrigation districts hydropower assessment study. Final feasibility assessment report. Volume I  

DOE Green Energy (OSTI)

In August 1978, the United States Department of Energy and the Turlock Irrigation District entered into a cooperative agreement for a Joint District's Low-Head Hydropower Assessment Study. The purpose of the agreement was to carry out a study of the hydropower potential at sites within the borders of the Turlock, Merced, South San Joaquin, and Oakdale Irrigation Districts in California. The required data were gathered and analyzed. The results of this study indicate the total potential small hydropower capacity with the Joint Districts is 19,560 kW installed with an annual energy generation of 68,561,800 kWh. This is equivalent to oil-savings of 118,616 barrels per y.

None

1979-02-01T23:59:59.000Z

3

Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts  

DOE Green Energy (OSTI)

Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required to rehabilitate the structures. Analyses of hydrology and power potential were carried out and a packaged tube turbine-generator unit was found to be suitable for installation at all sites. Project layouts were developed making maximum use of existing structures and natural and man-made features. Capital and operation and maintenance costs were estimated based on the project layouts and the selected turbine-generator units. Financial analyses were performed using a set of baseline assumptions. Sensitivity tests of alternative assumptions were also prepared, along with analyses of assistance program alternatives. Finally, the legal, environmental, and socio-institutional considerations affecting development of the hydro projects were identified and reviewed. Hydro developments on the Mill River were found to be technically feasible, presenting no extraordinary engineering, environmental, or legal problems. However, none of these projects, either individually or jointly, would be financially feasible without substantial assistance in the form of capital grants.

None

1979-01-01T23:59:59.000Z

4

Hydropower Reliability Study  

Science Conference Proceedings (OSTI)

Though hydroelectric plants are highly reliable, even a 1% improvement in their availability could save the U.S. utility industry $125 million per year. This comprehensive review of hydropower data and practices recommends ways to achieve such improvement.

1984-03-01T23:59:59.000Z

5

IEA Wind Task 24 Integration of Wind and Hydropower Systems; Volume 2: Participant Case Studies  

SciTech Connect

This report describes the background, concepts, issues and conclusions related to the feasibility of integrating wind and hydropower, as investigated by the members of IEA Wind Task 24. It is the result of a four-year effort involving seven IEA member countries and thirteen participating organizations. The companion report, Volume 2, describes in detail the study methodologies and participant case studies, and exists as a reference for this report.

Acker, T.

2011-12-01T23:59:59.000Z

6

Real Options in Small Hydropower Investments: An Empirical Study from Norway.  

E-Print Network (OSTI)

?? This empirical study examines investment behavior in small hydropower investments under uncertain electricity prices and revenues from selling so-called green certificates. We assess 73… (more)

Gravdehaug, Guro

2011-01-01T23:59:59.000Z

7

Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report  

DOE Green Energy (OSTI)

This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of <65 ft and the capacity to generate hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

Rinehart, B.N.

1991-06-01T23:59:59.000Z

8

Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report  

Science Conference Proceedings (OSTI)

This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

Rinehart, B.N.

1991-06-01T23:59:59.000Z

9

Microgrid Feasibility Study Report  

Science Conference Proceedings (OSTI)

Many electricity customers in rural areas in the northeastern part of the United States have been experiencing power outages lasting ten hours and longer, which far exceeds the Customer Average Interruption Duration Index target of approximately two hours.One possible solution would be to operate these remote communities as a microgrid when the power supply line is out of service. The utility contracted with the Electric Power Research Institute (EPRI) to conduct a feasibility study to ...

2013-12-19T23:59:59.000Z

10

Geothermal energy: feasibility study  

DOE Green Energy (OSTI)

A research program initiated to investigate the feasibility of using the geothermal energy available in salt domes to generate electrical power and of using cavities developed in salt domes as high temperature, high pressure chemical reaction vessels for converting municipal wastes to fuel oil or gas is described. Power generation from geothermal was not found to be economically feasible. The conversion of waste to fuel is possible if the problems of cavity collapse can be avoided. (MHR)

Hodgson, E.W. Jr.; Ziegler, R.C.

1976-02-01T23:59:59.000Z

11

Tribal Utility Feasibility Study  

SciTech Connect

The Schatz Energy Research Center (SERC) assisted the Yurok Tribe in investigating the feasibility of creating a permanent energy services program for the Tribe. The original purpose of the DOE grant that funded this project was to determine the feasibility of creating a full-blown Yurok Tribal electric utility to buy and sell electric power and own and maintain all electric power infrastructure on the Reservation. The original project consultant found this opportunity to be infeasible for the Tribe. When SERC took over as project consultant, we took a different approach. We explored opportunities for the Tribe to develop its own renewable energy resources for use on the Reservation and/or off-Reservation sales as a means of generating revenue for the Tribe. We also looked at ways the Tribe can provide energy services to its members and how to fund such efforts. We identified opportunities for the development of renewable energy resources and energy services on the Yurok Reservation that fall into five basic categories: • Demand-side management – This refers to efforts to reduce energy use through energy efficiency and conservation measures. • Off-grid, facility and household scale renewable energy systems – These systems can provide electricity to individual homes and Tribal facilities in areas of the Reservation that do not currently have access to the electric utility grid. • Village scale, micro-grid renewable energy systems - These are larger scale systems that can provide electricity to interconnected groups of homes and Tribal facilities in areas of the Reservation that do not have access to the conventional electric grid. This will require the development of miniature electric grids to serve these interconnected facilities. • Medium to large scale renewable energy development for sale to the grid – In areas where viable renewable energy resources exist and there is access to the conventional electric utility grid, these resources can be developed and sold to the wholesale electricity market. • Facility scale, net metered renewable energy systems – These are renewable energy systems that provide power to individual households or facilities that are connected to conventional electric utility grid.

Engel, R. A.; Zoellick, J. J.

2007-06-30T23:59:59.000Z

12

Commonwealth Hydropower Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commonwealth Hydropower Program Commonwealth Hydropower Program Commonwealth Hydropower Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit State Government Tribal Government Savings Category Water Buying & Making Electricity Home Weatherization Maximum Rebate Design and Construction: $600,000 Feasibility study: $40,000 Program Info Funding Source Massachusetts Renewable Energy Trust Start Date 09/2009 State Massachusetts Program Type State Grant Program Rebate Amount Design and Construction: 50% of costs or $1.00 per incremental kWh per year Feasibility study: 80% of costs Provider Massachusetts Clean Energy Center Note: This program reopened March 15, 2013. There is $1,200,000 available for Round 5; applications will be accepted on a rolling basis until funding

13

Flathead Renewable Energy Feasibility Study  

DOE Green Energy (OSTI)

The study shall assess the feasibility of a commercial wind facility on lands selected and owned by the Salish and Kootenai Tribes and shall examine the potential for the development of solar and biomass resources located on Tribal Lands.

Belvin Pete: Ed McCarthy; Krista Gordon; Chris Bergen; Rhett Good

2006-10-03T23:59:59.000Z

14

Neutrino Factory Feasibility Study  

NLE Websites -- All DOE Office Websites (Extended Search)

Witherell's Letter (Postscript) Final Version of the Neutrino Source Study Report (PDF) Organization Chart (Postscript) Two Day Meeting at Fermilab on February 15-16, 2000...

15

Neutrino Factory Feasibility Study  

NLE Websites -- All DOE Office Websites (Extended Search)

6-1 - 6-1 - April 15 th , 2000 6. Cooling 6.1 Introduction The goal of this six-month study is an integrated design for a neutrino source, subject to realistic engineering constraints. As will become evident, the coupling between the cooling-channel design and the design of the upstream components is critical to achieving the best performance. Nevertheless, to make sufficiently rapid progress it has been necessary to design the various components semi-independently, then optimize and iterate to converge towards an integrated design. While we have not yet arrived at a fully optimized design, we have studied sufficiently the cooling channels described below to determine that their performance is limited primarily by the performance of the current phase-rotation and buncher designs. While the designs presented here suffice for an entry-level neutrino factory (10

16

Hydropower Resources  

Energy.gov (U.S. Department of Energy (DOE))

Hydropower is used throughout the United States, but it is most common on the west coast—especially in the northwest. Although most of the best hydropower production sites have already been...

17

Wind Farm Feasibility Study  

Science Conference Proceedings (OSTI)

Saint Francis University has assessed the Swallow Farm property located in Shade Township, Somerset County, Pennsylvania as a potential wind power development site. Saint Francis worked with McLean Energy Partners to have a 50-meter meteorological tower installed on the property in April 2004 and continues to conduct a meteorological assessment of the site. Results suggest a mean average wind speed at 80 meters of 17 mph with a net capacity factor of 31 - 33%. Approximate electricity generation capacity of the project is 10 megawatts. Also, the University used matching funds provided by the federal government to contract with ABR, Inc. to conduct radar studies of nocturnal migration of birds and bats during the migrations seasons in the Spring and Fall of 2005 with a mean nocturnal flight altitude of 402 meters with less than 5% of targets at altitudes of less than 125 meters. The mean nocturnal passage rate was 166 targets/km/h in the fall and 145 targets/km/h in the spring. Lastly, University faculty and students conducted a nesting bird study May - July 2006. Seventy-three (73) species of birds were observed with 65 determined to be breeding or potentially breeding species; this figure represents approximately 30% of the 214 breeding bird species in Pennsylvania. No officially protected avian species were determined to be nesting at Swallow Farm.

Richard Curry; Erik Foley; DOE Project Officer - Keith Bennett

2007-07-11T23:59:59.000Z

18

Energy Basics: Hydropower Resources  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

19

Energy Basics: Hydropower Technologies  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

20

Hydropower Technologies  

Energy.gov (U.S. Department of Energy (DOE))

Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Manzanita Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit. Manzanita has explored the wind resource potential on tribal land and developed a business plan by means of this wind energy feasibility project, which enables Manzanita to make informed decisions when considering the benefits and risks of encouraging large-scale wind power development on their lands. Technical consultant to the project has been SeaWest Consulting, LLC, an established wind power consulting company. The technical scope of the project covered the full range of feasibility assessment activities from site selection through completion of a business plan for implementation. The primary objectives of this feasibility study were to: (1) document the quality and suitability of the Manzanita Reservation as a site for installation and long-term operation of a commercially viable utility-scale wind power project; and, (2) develop a comprehensive and financeable business plan.

Trisha Frank

2004-09-30T23:59:59.000Z

22

Small-Hydropower Development: The Process, Pitfalls, and Experience, Volume 3: Summary and Analysis of Technology Development Projects  

Science Conference Proceedings (OSTI)

With proper attention to specific site considerations, small hydropower development at existing dams and waterways is technically feasible. This conclusion, based on technical, economic, construction, and operations data from 23 small-hydro projects, represents the key finding in this third volume of a study conducted under the DOE National Small-Hydropower Program.

1987-09-25T23:59:59.000Z

23

Feasibility Study | OpenEI  

Open Energy Info (EERE)

23 23 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142280123 Varnish cache server Feasibility Study Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago)

24

Western Wind and Solar Integration Study: Hydropower Analysis  

DOE Green Energy (OSTI)

The U.S. Department of Energy's (DOE) study of 20% Wind Energy by 2030 was conducted to consider the benefits, challenges, and costs associated with sourcing 20% of U.S. energy consumption from wind power by 2030. This study found that with proactive measures, no insurmountable barriers were identified to meet the 20% goal. Following this study, DOE and the National Renewable Energy Laboratory (NREL) conducted two more studies: the Eastern Wind Integration and Transmission Study (EWITS) covering the eastern portion of the U.S., and the Western Wind and Solar Integration Study (WWSIS) covering the western portion of the United States. The WWSIS was conducted by NREL and research partner General Electric (GE) in order to provide insight into the costs, technical or physical barriers, and operational impacts caused by the variability and uncertainty of wind, photovoltaic, and concentrated solar power when employed to serve up to 35% of the load energy in the WestConnect region (Arizona, Colorado, Nevada, New Mexico, and Wyoming). WestConnect is composed of several utility companies working collaboratively to assess stakeholder and market needs to and develop cost-effective improvements to the western wholesale electricity market. Participants include the Arizona Public Service, El Paso Electric Company, NV Energy, Public Service of New Mexico, Salt River Project, Tri-State Generation and Transmission Cooperative, Tucson Electric Power, Xcel Energy and the Western Area Power Administration.

Acker, T.; Pete, C.

2012-03-01T23:59:59.000Z

25

Muon muon collider: Feasibility study  

Science Conference Proceedings (OSTI)

A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup {minus}2} s{sup {minus}1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice--the authors believe--to allow them to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring which has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design.

NONE

1996-06-18T23:59:59.000Z

26

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Virtual Hydropower Prospector do Brasil Access the Virtual Hydropower Prospector do Brasil Disclaimers NOTICE TO USERS The water energy resource and potential project information...

27

Virtual Hydropower Prospecting – Searching for Hydropower Gold  

DOE Green Energy (OSTI)

The availability of geographic information system (GIS) tools and analytical modeling of natural streams has made it possible to perform virtual “river inventories” that were formerly done using topographic maps, stream flow estimates, and physical reconnaissance. The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) virtually assessed the gross power potential of all natural streams in the United States of America and identified feasible potential project sites and estimated their developable power potential. The results of this virtual prospecting have been incorporated into a GIS application called the Virtual Hydropower Prospector that is available for public use on the Internet.

Douglas G. Hall

2007-12-01T23:59:59.000Z

28

Renewable Energy Feasibility Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Feasibility Study Renewable Energy Feasibility Study Renewable Energy Feasibility Study October 16, 2013 - 4:48pm Addthis After a Federal agency has identified probable technologies through the screening process, a detailed review of the feasibility and economic viability of each renewable energy technology, also called a renewable energy feasibility study, can determine which combination of renewable energy technologies most effectively meet the energy requirements and goals. When integrating renewable energy into a new construction project or major renovation, this level of renewable energy assessment will typically be commissioned by the design team and should be completed during to the schematic design phase. While a screening looks at the viability of each type of renewable energy, a feasibility study gets into details used to

29

Multnomah County Hydrokinetic Feasibility Study: Final Feasibility Study Report  

Science Conference Proceedings (OSTI)

HDR has completed a study of the technical, regulatory, and economic feasibility of installing hydrokinetic turbines under the Morrison, Broadway, and Sellwood bridges. The primary objective of installing hydrokinetic turbines is a demonstration of in-stream hydrokinetic technologies for public education and outreach. Due to the low gradient of the Lower Willamette and the effects of the tide, velocities in the area in consideration are simply not high enough to economically support a commercial installation. While the velocities in the river may at times provide enough energy for a commercial turbine to reach capacity, the frequency and duration of high flow events which provide suitable velocities is not sufficient to support a commercial hydrokinetic installation. We have observed that over an 11 year period, daily average velocities in the Lower Willamette exceeded a nominal cut-in speed of 0.75 m/s only 20% of the time, leaving net zero power production for the remaining 80% of days. The Sellwood Bridge site was estimated to have the best hydrokinetic resource, with an estimated average annual production of about 9,000 kWh. The estimated production could range from 2,500 kWh to 15,000 kWh. Based on these energy estimates, the amount of revenue generated through either a power purchase agreement (PPA) or recovered through net metering is not sufficient to repay the project costs within the life of the turbine. The hydrokinetic resource at the Morrison and Broadway Bridges is slightly smaller than at the Sellwood Bridge. While the Broadway and Morrison Bridges have existing infrastructure that could be utilized, the project is not expected to generate enough revenue to repay the investment. Despite low velocities and energy production, the sites themselves are favorable for installation of a demonstration or experimental project. With high public interest in renewable energy, the possibility exists to develop a hydrokinetic test site which could provide developers and scientists a location to temporarily deploy and test hydrokinetic devices, and also function as an educational tool for the general public. Bridge piers provide an excellent pre-existing anchor point for hydrokinetic devices, and existing infrastructure at the Morrison and Broadway Bridges may reduce installation costs. Opportunity exists to partner with local universities with engineering and environmental interest in renewable energy. A partnership with Portland State University�¢����s engineering school could provide students with an opportunity to learn about hydrokinetics through senior design projects. Oregon State University and University of Washington, which are partnered through the Northwest National Marine Renewable Energy Center (NNMREC) to study and test hydrokinetic technology, are also relatively local to the site. In addition to providing an opportunity for both public and private entities to learn technically about in-stream kinetics, this approach will encourage grant funding for outreach, education, and product development, while also serving as a positive community relations opportunity for the County and its partners.

Stephen Spain

2012-03-15T23:59:59.000Z

30

WERF MACT Feasibility Study Report  

SciTech Connect

This study was undertaken to determine the technical feasibility of upgrading the Waste Experimental Reduction Facility (WERF) at the Idaho National Engineering and Environmental Laboratory to meet the offgas emission limits proposed in the Maximum Achievable Control Technologies (MACT)rule. Four practicable offgas treatment processes were identified, which, if installed, would enable the WERF to meet the anticipated MACT emission limits for dioxins and furans (D/F), hydrochloric acid (HCI), and mercury (Hg). Due to the three-year time restraint for MACT compliance, any technology chosen for the upgrade must be performed within the general plant project funding limit of $5 M. The option selected consists of a partial-quench evaporative cooler with dry sorbent injection for HCI removal followed by a sulfur-impregnated activated carbon bed for Hg control. The planning cost estimate for implementing the option is $4.17 M (with 24% contingency). The total estimated cost includes capital costs, design and construction costs, and project management costs. Capital costs include the purchase of a new offgas evaporative cooler, a dry sorbent injection system with reagent storage, a new fabric filter baghouse, a fixed carbon bed absorber, and two offgas induced draft exhaust fans. It is estimated that 21 months will be required to complete the recommended modification to the WERF. The partial-quench cooler is designed to rapidly cool the offgas exiting the secondary combustion chamber to minimize D/F formation. Dry sorbent injection of an alkali reagent into the offgas is recommended. The alkali reacts with the HCI to form a salt, which is captured with the fly ash in the baghouse. A design HCI removal efficiency of 97.2% allows for the feeding 20 lbs/hr of chlorine to the WERF incinerator. The sorbent feed rate can be adjusted to achieve the desired HCI removal efficiency. A fixed bed of sulfur-impregnated carbon was conservatively sized for a total Hg removal capacity when feeding 10 g/hr Hg to the WERF incinerator. An added benefit for using carbon adsorption is that the activated carbon will also capture a large fraction of any residual D/F present in the offgas.

B. Bonnema; D. Moser; J. Riedesel; K. Kooda; K. Liekhus; K. Rebish; S. Poling

1998-11-01T23:59:59.000Z

31

Hydropower Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technologies Hydropower Technologies August 14, 2013 - 3:03pm Addthis Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the...

32

Sault Tribe Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

The Sault Tribe conducted a feasibility study on tribal lands in the Upper Peninsula of Michigan to determine the technical and economic feasibility of both small and large-scale wind power development on tribal lands. The study included a wind resource assessment, transmission system analysis, engineering and regulatory analyzes and assessments.

Toni Osterhout; Global Energy Concepts

2005-07-31T23:59:59.000Z

33

Muon Muon Collider: Feasibility Study  

SciTech Connect

A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup -2}s{sup -1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice - we believe - to allow us to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring wich has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design. Muons because of their large mass compared to an electron, do not produce significant synchrotron radiation. As a result there is negligible beamstrahlung and high energy collisions are not limited by this phenomena. In addition, muons can be accelerated in circular devices which will be considerably smaller than two full-energy linacs as required in an e{sup +} - e{sup -} collider. A hadron collider would require a CM energy 5 to 10 times higher than 4 TeV to have an equivalent energy reach. Since the accelerator size is limited by the strength of bending magnets, the hadron collider for the same physics reach would have to be much larger than the muon collider. In addition, muon collisions should be cleaner than hadron collisions. There are many detailed particle reactions which are open to a muon collider and the physics of such reactions - what one learns and the necessary luminosity to see interesting events - are described in detail. Most of the physics accesible to an e{sup +} - e{sup -} collider could be studied in a muon collider. In addition the production of Higgs bosons in the s-channel will allow the measurement of Higgs masses and total widths to high precision; likewise, t{bar t} and W{sup +}W{sup -} threshold studies would yield m{sub t} and m{sub w} to great accuracy. These reactions are at low center of mass energy (if the MSSM is correct) and the luminosity and {Delta}p/p of the beams required for these measurements is detailed in the Physics Chapter. On the other hand, at 2 + 2 TeV, a luminosity of L {approx} 10{sup 35} cm{sup -2}s{sup -1} is desirable for studies such as, the scattering of longitudinal W bosons or the production of heavy scalar particles. Not explored in this work, but worth noting, are the opportunities for muon-proton and muon-heavy ion collisions as well as the enormous richness of such a facility for fixed target physics provided by the intense beams of neutrinos, muons, pions, kaons, antiprotons and spallation neutrons. To see all the interesting physics described herein requires a careful study of the operation of a detector in the very large background. Three sources of background have been identified. The first is from any halo accompanying the muon beams in the collider ring. Very carefully prepared beams will have to be injected and maintained. The second is due to the fact that on average 35% of the muon energy appears in its decay electron. The energy of the electron subsequently is converted into EM showers either from the synchrotron radiation they emit in the collider magnetic field or from direct collision with the surrounding material. The decays that occur as the beams traverse the low beta insert are of particular concern for detector backgrounds. A third source of background is e{sup +} - e{sup -} pair creation from {mu}{sup +} - {mu}{sup -} interaction. Studies of

Gallardo, J.C.; Palmer, R.B.; /Brookhaven; Tollestrup, A.V.; /Fermilab; Sessler, A.M.; /LBL, Berkeley; Skrinsky, A.N.; /Novosibirsk, IYF; Ankenbrandt, C.; Geer, S.; Griffin, J.; Johnstone, C.; Lebrun, P.; McInturff, A.; Mills, Frederick E.; Mokhov, N.; Moretti, A.; Neuffer, D.; Ng, K.Y.; Noble, R.; Novitski, I.; Popovic, M.; Qian, C.; Van Ginneken, A. /Fermilab /Brookhaven /Wisconsin U., Madison /Tel Aviv U. /Indiana U. /UCLA /LBL, Berkeley /SLAC /Argonne /Sobolev IM, Novosibirsk /UC, Davis /Munich, Tech. U. /Virginia U. /KEK, Tsukuba /DESY /Novosibirsk, IYF /Jefferson Lab /Mississippi U. /SUNY, Stony Brook /MIT /Columbia U. /Fairfield U. /UC, Berkeley

2012-04-05T23:59:59.000Z

34

TVA Low Impact Hydro Feasibility Study: Phase 1 Technology and Site Assessment  

Science Conference Proceedings (OSTI)

As a result of the Tennessee Valley Authority (TVA)'s interest in further developing its green marketing program, it partnered with EPRI for guidance in a new study of TVA's hydropower resources. As a result of an EPRI solicitation of bids for TVA's "Low Impact Hydro Feasibility Study," Verdant Power, in its primary role as a systems integrator and site developer, was chosen to conduct the project. TVA's initial interest was to have surveyed 24 impoundment sites and several non-impoundment locations with...

2002-12-12T23:59:59.000Z

35

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This report provides a preliminary examination of the practices and problems associated with trash and debris at hydropower installations. The Hydropower Technology Roundup project surveyed the perspectives of multiple hydropower producers with respect to their management of trash and debris.

2007-03-26T23:59:59.000Z

36

Three Affliated Tribes Renewable Energy Feasibility Study  

DOE Green Energy (OSTI)

The Three Affliated Tribes on the Fort Berthold Reservation studied the feasibility of a commercial wind facility on land selected and owned by the Tribes and examined the potential for the development of renewable energy resources on Tribal Lands.

Belvin Pete; Kent Good; Krista Gordon; Ed McCarthy,

2006-05-26T23:59:59.000Z

37

Final DOE Areas Feasibility Study  

Office of Legacy Management (LM)

a program at LEHR to study the potential health effects of combustion products from fossil fuel power plants. In 1983, the Toxic Pollutant Health Research Laboratory (TPHRL)...

38

Geothermal feasibility study for Malting Investments Inc  

SciTech Connect

The engineering feasibility of using geothermal heat in the kilning, germination, and steep water cooling processes for a malting facility is determined. The study is based upon a malting facility with an annual capacity of malting three million bushels of clean graded barley per year or 8220 bushels per day. Capital cost figures used in the feasibility study are budget prices for the basic equipment only, they do not include any other costs such as installation, instrumentation or design and engineering costs. Utility prices are based upon $0.03 per kilowatt hour and $0.4548 per therm for natural gas.

1981-10-01T23:59:59.000Z

39

A cask maintenance facility feasibility study  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

40

DOE Seeks Industry Proposals for Feasibility Study to Produce...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE Seeks Industry Proposals for Feasibility Study to Produce...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to Produce...

42

Alternative Fuels Data Center: Alternative Fuels Feasibility Study  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuels Alternative Fuels Feasibility Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Feasibility Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Feasibility Study The North Carolina State Energy Office, Department of Administration,

43

Parametric virtual laboratory development: A hydropower case study with student perspectives  

Science Conference Proceedings (OSTI)

In order to take advantage of trends such as genetic-design students need to be familiar, and comfortable, with the concept of parametric computer models and how their parameters relate to physical-forms. Virtual learning software can aid in creating ... Keywords: 3D modeling, Graphics, Hydropower, Parametric, Rotors, Virtual learning

Andrew M. Thomas, Venkatesh C. Vijay, Pathmeswaran Raju, Craig Chapman, Parmjit Chima, Alok Mathur, Adel Chemaly

2013-10-01T23:59:59.000Z

44

A study of a turbine-generator system for low-head hydropower  

Science Conference Proceedings (OSTI)

A method is outlined for determining the optimum operating conditions of a turbine-generator unit installed across a low-head irrigation structure for electrical power generation. For a given regulator's characteristic, the unit's rated power and design parameters are determined such that its cost-benefit ratio is minimum. The economical feasibility of the microhydro plant is studied by comparing its life-time cost to its lifetime benefit. The benefit is determined by the cost of the corresponding energy generated through a dieseldriven generator set. The microhydro plant was found to be economically feasible over a wide range of inflation and interest rates.

Mankbadi, R.R.; Mikhail, S.

1985-03-01T23:59:59.000Z

45

Gasohol: economic feasibility study. Final report  

DOE Green Energy (OSTI)

This report was prepared by Development Planning and Research Associates, Inc. under a contract with the Energy Research and Development Center of the University of Nebraska in cooperation with the Agricultural Products Industrial Utilization Committee and the State of Nebraska. Funding for this study was provided to the Energy Research and Development Center by the U.S. Department of Energy and the Old West Regional Commission. The primary objective of the study was to: determine the fiscal and market conditions under which the production of gasohol would be profitable for private producers. For purposes of this study, gasohol is a motor fuel consisting of 10 percent agriculturally-derived anhydrous ethanol and 90 percent unleaded gasoline. The study assumes that gasohol can be a fuel substitute for gasoline; indeed, the cost of gasoline will significantly influence that for gasohol. Gasoline prices are determined by factors external to ethanol; thus, the economic feasibility study of gasohol is in large part an economic feasibility study of fuel-grade ethanol production. More specifically, the study examined the following: the technical aspects of distributing, marketing, and using gasohol; the costs of the distribution and marketing of ethanol and gasohol; the energy balance of ethanol production; the cost of producing ethanol; the factors influencing ehtanol plant size and location; and the conditions that would make ethanol economicaly feasible for private producers.

David, M. L.; Hammaker, G. S.; Buzenberg, R. J.; Wagner, J. P.

1978-07-01T23:59:59.000Z

46

UCSD Biomass to Power Economic Feasibility Study  

E-Print Network (OSTI)

Biofuels, LLC  UCSD Biomass to Power  Economic Feasibility Figure 1: West Biofuels Biomass Gasification to Power rates..……………………. ……31  UCSD Biomass to Power ? Feasibility 

Cattolica, Robert

2009-01-01T23:59:59.000Z

47

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

The water energy resource and potential project information provided by the Virtual Hydropower Prospector (VHP) is as accurate as possible within the limitations of the...

48

Idaho National Laboratory - Hydropower Program - Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho National Laboratory is operated for the U.S. Department of Energy's Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower ...

49

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Sources Feature Set Source Vintage URL Water Energy Resource Sites (All) Idaho National Laboratory 2004 http:hydropower.inl.govresourceassessment Resource Assessment...

50

Hydropower Appropriations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home Hydropower Appropriations Hydropower Appropriations List of projects selected focusing on updating...

51

Substation Bus Ampacity Uprating: Feasibility Study  

Science Conference Proceedings (OSTI)

The continuous increase in demand for electric power has pushed some of the components in the Con Edison system to their design limits. These limits, established in the past, were often selected with general and conservative assumptions. Consequently, Con Edison requested the Electric Power Research Institute (EPRI) to investigate the possibility of raising the rating of their 3,000A substation bus to a higher value.The first step in the investigation was to conduct a feasibility study ...

2013-04-24T23:59:59.000Z

52

Study on Reactive Power and Voltage Control of Power Grid with Small Hydropower  

Science Conference Proceedings (OSTI)

When it is in the wet season and the load is low, reactive power surplus and voltage rise are caused by high-efficiency power generation of small hydropower and load reduction in Linjiang region, Baishan city, JiLin province. These problems, which exist ... Keywords: small hydro power, vally load, reactive power balance, the rise in voltage, generator in leading power factor on operation

Yaopeng Bai; Lijie Xu; Wei Wang

2010-06-01T23:59:59.000Z

53

Feasibility studies of aquifer thermal energy storage  

DOE Green Energy (OSTI)

Determining the feasibility of using aquifer thermal energy storage (ATES) for a particular heating or cooling application is an interdisciplinary effort, requiring (at a minimum) expertise in engineering and hydrology. The feasibility study should proceed in two distinct stages. The first stage, which is limited in scope and detail, is intended to show if an ATES system is technically and economically suited to the application. Focus of this preliminary investigation is on revealing the existence of factors that might weigh heavily against the use of ATES methods, and, in the absence of such factors, on choosing a suitable scale for the ATES plant and well field. The results of the preliminary investigation are used to determine if more detailed investigation--including field studies--are justified, and to facilitate comparing the advantages of ATES to those of other means of providing heating or cooling. The second stage of the feasibility study focuses on detailed aquifer characterization, refinement of engineering design and cost estimates, and economic and environmental risk analysis. The results of this investigation, if favorable, will be used to justify the expense of constructing the ATES system.

Hall, S H

1993-01-01T23:59:59.000Z

54

Idaho National Laboratory - Hydropower Program - Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software State Resource Assessments Resource Assessments Reports Technology Transfer Virtual Hydropower Prospector Virtual Hydropower Prospector do Brasil...

55

Energy Basics: Large-Scale Hydropower  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

56

Hydropower potential in Turkey  

Science Conference Proceedings (OSTI)

Turkey has a total hydropower potential of 433 GW that is equal to 1.2% of the total hydropower potential of the world and to 14% of European hydropower potential. Only 125 GW of the total hydroelectric potential of Turkey can be economically used. By the commissioning of new hydropower plants, which are under construction, 34% of the economically usable potential of the country would be tapped. At the present, hydropower energy is an important energy source for Turkey due to its useful characteristics such as being renewable, clean, and less of an impact on the environment, and a cheap and domestic energy source.

Kaygusuz, K. [Karadeniz Technical Univ., Trabzon (Turkey). Dept. of Chemistry

1999-08-01T23:59:59.000Z

57

Scoping Study to Evaluate Feasibility of National Databases for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices Scoping Study to Evaluate Feasibility of National Databases for EM&V...

58

Battery energy storage market feasibility study  

DOE Green Energy (OSTI)

Under the sponsorship of the Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed energy storage as an important enabling technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

Kraft, S. [Frost and Sullivan, Mountain View, CA (United States); Akhil, A. [Sandia National Labs., Albuquerque, NM (United States). Energy Storage Systems Analysis and Development Dept.

1997-07-01T23:59:59.000Z

59

NREL: Technology Transfer - Study Shows Feasibility of High Wind ...  

National Renewable Energy Laboratory Technology Transfer Study Shows Feasibility of High Wind Penetrations in Southwest Power Pool March 15, 2010

60

Feasibility study for Boardman River hydroelectric power. Final report  

DOE Green Energy (OSTI)

The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

None

1979-02-22T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Aleutian Pribilof Islands Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy options for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.

Bruce A. Wright

2012-03-27T23:59:59.000Z

62

Lunar Wireless Power Transfer Feasibility Study  

Science Conference Proceedings (OSTI)

This study examines the feasibility of a multi-kilowatt wireless radio frequency (RF) power system to transfer power between lunar base facilities. Initial analyses, show that wireless power transfer (WPT) systems can be more efficient and less expensive than traditional wired approaches for certain lunar and terrestrial applications. The study includes evaluations of the fundamental limitations of lunar WPT systems, the interrelationships of possible operational parameters, and a baseline design approach for a notionial system that could be used in the near future to power remote facilities at a lunar base. Our notional system includes state-of-the-art photovoltaics (PVs), high-efficiency microwave transmitters, low-mass large-aperture high-power transmit antennas, high-efficiency large-area rectenna receiving arrays, and reconfigurable DC combining circuitry.

Sheldon Freid, et al.

2008-06-01T23:59:59.000Z

63

DOE Hydropower Program Biennial Report for FY 2005-2006  

DOE Green Energy (OSTI)

SUMMARY The U.S. Department of Energy (DOE) Hydropower Program is part of the Office of Wind and Hydropower Technologies, Office of Energy Efficiency and Renewable Energy. The Program's mission is to conduct research and development (R&D) that will increase the technical, societal, and environmental benefits of hydropower. The Department's Hydropower Program activities are conducted by its national laboratories: Idaho National Laboratory (INL) [formerly Idaho National Engineering and Environmental Laboratory], Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and National Renewable Energy Laboratory (NREL), and by a number of industry, university, and federal research facilities. Programmatically, DOE Hydropower Program R&D activities are conducted in two areas: Technology Viability and Technology Application. The Technology Viability area has two components: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices) and (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis). The Technology Application area also has two components: (1) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications) and (2) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology). This report describes the progress of the R&D conducted in FY 2005-2006 under all four program areas. Major accomplishments include the following: Conducted field testing of a Retrofit Aeration System to increase the dissolved oxygen content of water discharged from the turbines of the Osage Project in Missouri. Contributed to the installation and field testing of an advanced, minimum gap runner turbine at the Wanapum Dam project in Washington. Completed a state-of-the-science review of hydropower optimization methods and published reports on alternative operating strategies and opportunities for spill reduction. Carried out feasibility studies of new environmental performance measurements of the new MGR turbine at Wanapum Dam, including measurement of behavioral responses, biomarkers, bioindex testing, and the use of dyes to assess external injuries. Evaluated the benefits of mitigation measures for instream flow releases and the value of surface flow outlets for downstream fish passage. Refined turbulence flow measurement techniques, the computational modeling of unsteady flows, and models of blade strike of fish. Published numerous technical reports, proceedings papers, and peer-reviewed literature, most of which are available on the DOE Hydropower website. Further developed and tested the sensor fish measuring device at hydropower plants in the Columbia River. Data from the sensor fish are coupled with a computational model to yield a more detailed assessment of hydraulic environments in and around dams. Published reports related to the Virtual Hydropower Prospector and the assessment of water energy resources in the U.S. for low head/low power hydroelectric plants. Convened a workshop to consider the environmental and technical issues associated with new hydrokinetic and wave energy technologies. Laboratory and DOE staff participated in numerous workshops, conferences, coordination meetings, planning meetings, implementation meetings, and reviews to transfer the results of DOE-sponsored research to end-users.

Sale, Michael J [ORNL; Cada, Glenn F [ORNL; Acker, Thomas L. [Northern Arizona State University and National Renewable Energy Laboratory; Carlson, Thomas [Pacific Northwest National Laboratory (PNNL); Dauble, Dennis D. [Pacific Northwest National Laboratory (PNNL); Hall, Douglas G. [Idaho National Laboratory (INL)

2006-07-01T23:59:59.000Z

64

Exoskeleton for Soldier Enhancement Systems Feasibility Study  

DOE Green Energy (OSTI)

The development of a successful exoskeleton for human performance augmentation (EHPA) will require a multi-disciplinary systems approach based upon sound biomechanics, power generation and actuation systems, controls technology, and operator interfaces. The ability to integrate key components into a system that enhances performance without impeding operator mobility is essential. The purpose of this study and report are to address the issue of feasibility of building a fieldable EHPA. Previous efforts, while demonstrating progress and enhancing knowledge, have not approached the level required for a fully functional, fieldable system. It is doubtless that the technologies required for a successful exoskeleton have advanced, and some of them significantly. The question to be addressed in this report is have they advanced to the point of making a system feasible in the next three to five years? In this study, the key technologies required to successfully build an exoskeleton have been examined. The primary focus has been on the key technologies of power sources, actuators, and controls. Power sources, including internal combustion engines, fuel cells, batteries, super capacitors, and hybrid sources have been investigated and compared with respect to the exoskeleton application. Both conventional and non-conventional actuator technologies that could impact EHPA have been assessed. In addition to the current state of the art of actuators, the potential for near-term improvements using non-conventional actuators has also been addressed. Controls strategies, and their implication to the design approach, and the exoskeleton to soldier interface have also been investigated. In addition to these key subsystems and technologies, this report addresses technical concepts and issues relating to an integrated design. A recommended approach, based on the results of the study is also presented.

Jansen, J.F.

2000-09-28T23:59:59.000Z

65

A Study on the Integrated MSW Management Technologies of Work Zone in the Hydropower Station of Yangtze Basin  

Science Conference Proceedings (OSTI)

As the hydropower exploitation of Yangtze basin in China is booming, thousands of workers work and live in the construction encampment, which results in more and more serious MSW pollution. In order to control environment pollution and protect the health ... Keywords: Municipal Solid Waste (MSW), Yangtze Basin, Integrated Waste Management, Pollution Control, Work Zone of Hydropower Station, Analytic Hierarchy Process (AHP)

Han Zhiyong; Liu Dan; Li Qibin; Xie Guangwu; Lang Jian; Zhang Luliang

2011-02-01T23:59:59.000Z

66

Advanced Turbine Systems scoping and feasibility studies  

DOE Green Energy (OSTI)

The objective of the Advanced Turbine Systems (ATS) study was to investigate innovative natural gas fired cycle developments to determine the feasibility of achieving 60% (LHV) efficiency within a 10-year time frame. The potential ATS was to be environmentally superior, cost competitive and adaptable to coal-derived fuels. The National Energy Strategy (NES) calls for a balanced program of greater energy efficiency, use of alternative fuels, and the environmentally responsible development of all US energy resources> Consistent with the NES, a Department of Energy (DOE) program has been created to develop Advanced Turbine Systems. The objective of this 10-year program is to develop natural gas fired base load power plants that will have cycle efficiencies greater than 60% (LHV), be environmentally superior to current technology, and also be cost competitive.

Bannister, R.L.; Little, D.A.; Wiant, B.C. (Westinghouse Electric Corp., Orlando, FL (United States)); Archer, D.H. (Carnegie-Mellon Univ., Pittsburgh, PA (United States))

1993-01-01T23:59:59.000Z

67

Bin Set 1 Calcine Retrieval Feasibility Study  

SciTech Connect

At the Department of Energy's Idaho Nuclear Technology and Engineering Center, as an interim waste management measure, both mixed high-level liquid waste and sodium bearing waste have been solidified by a calculation process and are stored in the Calcine Solids Storage Facilities. This calcined product will eventually be treated to allow final disposal in a national geologic repository. The Calcine Solids Storage Facilities comprise seven ''bit sets.'' Bin Set 1, the first to be constructed, was completed in 1959, and has been in service since 1963. It is the only bin set that does not meet current safe-shutdown earthquake seismic criteria. In addition, it is the only bin set that lacks built-in features to aid in calcine retrieval. One option to alleviate the seismic compliance issue is to transport the calcine from Bin Set 1 to another bin set which has the required capacity and which is seismically qualified. This report studies the feasibility of retrieving the calcine from Bi n Set 1 and transporting it into Bin Set 6 which is located approximately 650 feet away. Because Bin Set 1 was not designed for calcine retrieval, and because of the high radiation levels and potential contamination spread from the calcined material, this is a challenging engineering task. This report presents preconceptual design studies for remotely-operated, low-density, pneumatic vacuum retrieval and transport systems and equipment that are based on past work performed by the Raytheon Engineers and Constructors architectural engineering firm. The designs presented are considered feasible; however, future development work will be needed in several areas during the subsequent conceptual design phase.

R. D. Adams; S. M. Berry; K. J. Galloway; T. A. Langenwalter; D. A. Lopez; C. M. Noakes; H. K. Peterson; M. I. Pope; R. J. Turk

1999-10-01T23:59:59.000Z

68

Hydropower Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Resources Hydropower Resources August 16, 2013 - 4:06pm Addthis Hydropower is used throughout the United States, but it is most common on the west coast-especially in...

69

IEA Wind Task 24 Integration of Wind and Hydropower Systems; Volume 1: Issues, Impacts, and Economics of Wind and Hydropower Integration  

DOE Green Energy (OSTI)

This report describes the background, concepts, issues and conclusions related to the feasibility of integrating wind and hydropower, as investigated by the members of IEA Wind Task 24. It is the result of a four-year effort involving seven IEA member countries and thirteen participating organizations. The companion report, Volume 2, describes in detail the study methodologies and participant case studies, and exists as a reference for this report.

Acker, T.

2011-12-01T23:59:59.000Z

70

BIOMASS-TO-ENERGY FEASIBILITY STUDY  

DOE Green Energy (OSTI)

The purpose of this study was to assess the economic and technical feasibility of producing electricity and thermal energy from biomass by gasification. For an economic model we chose a large barley malting facility operated by Rahr Malting Co. in Shakopee, Minnesota. This plant provides an excellent backdrop for this study because it has both large electrical loads and thermal loads that allowed us to consider a wide range of sizes and technical options. In the end, eleven scenarios were considered ranging from 3.1 megawatts (MWe) to 19.8 MWe. By locating the gasification and generation at an agricultural product processing plant with large electrical and thermal loads, the expectation was that some of the limitations of stand-alone biomass power plants would be overcome. In addition, since the process itself created significant volumes of low value biomass, the hope was that most of the biomass gathering and transport issues would be handled as well. The development of low-BTU gas turbines is expected to fill a niche between the upper limit of multiple spark ignited engine set systems around 5 MWe and the minimum reasonable scale for steam turbine systems around 10 MWe.

Cecil T. Massie

2002-09-03T23:59:59.000Z

71

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower What's New New Features Virtual Hydropower Prospector do Basil, Version 1.0 A GIS...

72

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software To assess the hydropower potential in any area of the United States from a national perspective, a uniform set of criteria was developed and a...

73

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Army Corps of Engineers Bureau of Reclamation Bureau of Land Management National Hydropower Association Low Impact Hydropower Institute Conservation Biology Institute Tools &...

74

National Hydropower Association conference proceedings  

Science Conference Proceedings (OSTI)

These proceedings collect papers on hydroelectricity. Topics include legal developments in hydropower regulation, an overview of the small hydro industry, and financing hydropower projects.

Not Available

1985-01-01T23:59:59.000Z

75

& CONSUMPTION US HYDROPOWER PRODUCTION  

E-Print Network (OSTI)

12% of the nation's electricity. Hydropower produces more than 90,000 megawatts of electricity, which is enough to meet the needs of 28.3 million consumers. Hydropower accounts for over 90% of all electricity the NAO. ENERGY CONSUMPTION AND PRODUCTION IN NORWAY AND THE NAO The demand for heating oil in Norway

76

NETL: Gasification - Feasibility Studies to Improve Plant Availability...  

NLE Websites -- All DOE Office Websites (Extended Search)

Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in IGCC Plants General Electric Company Project Number: FE0007859 Project Description General...

77

Biomass Feasibility Study Grant Program (Indiana) | Open Energy...  

Open Energy Info (EERE)

24, 2011. This incentive is NOT active. Financial Incentive Program Place Indiana Name Biomass Feasibility Study Grant Program Incentive Type State Grant Program Applicable...

78

Microsoft Word - 2011 Hydropower Conference Agenda 053111  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome KCD 1:15 p.m. Introductory Remarks KCD SWPA Ted Coombes, SPRA 1:45 p.m. COE Hydropower Modernization Kamau Sadiki, COE HQ Initiative - Study Results and Southwestern...

79

Microsoft Word - FINAL 2012 Hydropower Conference Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Introductory Remarks MVD Colonel Masset, SWL SWPA Ted Coombes, SPRA 1:45 p.m. COE Hydropower Modernization Kamau Sadiki, COE HQ Initiative - Study Results and Marshall Boyken,...

80

Conventional Hydropower Technologies (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet describes the DOE Water Power Program's conventional hydropower research and development efforts.

Not Available

2011-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

B Plant process piping replacement feasibility study  

SciTech Connect

Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

Howden, G.F.

1996-02-07T23:59:59.000Z

82

Hydropower research and development  

DOE Green Energy (OSTI)

This report is a compilation of information on hydropower research and development (R and D) activities of the Federal government and hydropower industry. The report includes descriptions of on-going and planned R and D activities, 1996 funding, and anticipated future funding. Summary information on R and D projects and funding is classified into eight categories: fish passage, behavior, and response; turbine-related; monitoring tool development; hydrology; water quality; dam safety; operations and maintenance; and water resources management. Several issues in hydropower R and D are briefly discussed: duplication; priorities; coordination; technical/peer review; and technology transfer/commercialization. Project information sheets from contributors are included as an appendix.

NONE

1997-03-01T23:59:59.000Z

83

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy's Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower Hydropower Facts Hydropower: Partnership with the Environment...

84

Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Feasibility Study of Hydrogen Production at Existing Nuclear Power Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants A funding opportunity announcement of the cost shared feasibility studies of nuclear energy based production of hydrogen using available technology. The objective of this activity is to select and conduct project(s) that will utilize hydrogen production equipment and nuclear energy as necessary to produce data and analysis on the economics of hydrogen production with nuclear energy. Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants More Documents & Publications https://e-center.doe.gov/iips/faopor.nsf/UNID/E67E46185A67EBE68 Microsoft Word - FOA cover sheet.doc Microsoft Word - hDE-FOA-0000092.rtf

85

Large-Scale Hydropower  

Energy.gov (U.S. Department of Energy (DOE))

Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 MW in size, and there is more than 80,000 MW...

86

Energy Basics: Hydropower Resources  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on the west coast-especially in the northwest. Although most of the best hydropower production sites have already been developed, many more potential sites have not. Learn more...

87

Quantifying the Value of Hydropower in the Electric Grid  

Science Conference Proceedings (OSTI)

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results ...

2013-03-01T23:59:59.000Z

88

The Substation of the Future: A Feasibility Study  

E-Print Network (OSTI)

The Substation of the Future: A Feasibility Study Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Substation of the Future Engineering Research Center (PSERC) research project T-38 titled "Substation of the Future: A Feasibility

89

The Role of Hydropower Reservoirs in Greenhouse Gas Emissions  

Science Conference Proceedings (OSTI)

Recent publications of measurements and analyses of reservoir greenhouse gas (GHG) emissions have sparked debate about the carbon neutrality of hydropower. This report describes the results of two initial tasks of a multiyear study to assess the importance of carbon cycling and GHG emissions from hydropower reservoirs and operations in the United States. The risks this issue presents to the U.S. hydropower industry are discussed, and a plan to resolve uncertainties is presented. Throughout this report, r...

2010-05-20T23:59:59.000Z

90

Neutrino Factory Feasibility Study-II Neutrino Factory Feasibility Study-II  

NLE Websites -- All DOE Office Websites (Extended Search)

Study-II Study-II Neutrino Factory Feasibility Study-II Editors Meeting January 29-31 2 0 0 1 a t B N L Editors Meeting January 29-31 2 0 0 1 a t B N L Elevation Plan Ring Layout Study-II Challenge: Storage Ring Footprint For Study-II it is important to find a solution that gives a very compact arc.* *Here arc definition includes all regions with dipoles. B. Parker 29-Jan-01 * For given straight section decay ratio a shorter arc reduces the site footprint. * For given straight section length a shorter arc increases ν production efficiency. C =1753 m Storage Ring Footprint: Ring Scaling Part 1 First consider energy scaling from 50 to 20 GeV B. Parker 29-Jan-01 C = 700 m C = 840 m C = 530 m Overly naive scaling gives: 1753 m x (2/5) ≈ 700 m * 250% larger emittance at 20 GeV drives larger

91

Co-combustion feasibility study. Final report  

DOE Green Energy (OSTI)

This report investigates the technical and economic feasibility of co-combusting municipal sewage sludge produced by the Saratoga County Sewer District No. 1 with paper mill sludge produced by the Cottrell Paper Company, Encore Paper Company, International Paper Company, Mohawk Paper Mills, and TAGSONS Papers at the Saratoga County Sewer District No. 1`s secondary wastewater treatment plant and recovering any available energy products. The co-combustion facility would consist of sludge and wood chip storage and conveying systems, belt filter presses, screw presses, fluidized-bed incinerators, venturi scrubbers and tray cooling systems, ash dewatering facilities, heat recovery steam generators, gas-fired steam superheaters, and a back-pressure steam turbine system. Clean waste wood chips would be used as an auxiliary fuel in the fluidized-bed incinerators. It is recommended that the ash produced by the proposed facility be beneficially used, potentially as a raw material in the manufacture of cement and/or as an interim barrier layer in landfills.

Handcock, D.J. [Clough, Harbour and Associates, Albany, NY (United States)

1995-01-01T23:59:59.000Z

92

National Hydropower Association | Open Energy Information  

Open Energy Info (EERE)

by expanding it. National Hydropower Association is a company located in Washington, DC . References "National Hydropower Association" Retrieved from "http:...

93

Algae Based Carbon Capture and Utilization feasibility study.  

E-Print Network (OSTI)

?? This pre-feasibility study was taken out by the co-operation with Zhejiang University, the CEU lab in Zhejiang University is taking researches of the algae… (more)

Sen, Cong

2012-01-01T23:59:59.000Z

94

Feasibility study of a VirtualPower Plant for Ludvika.  

E-Print Network (OSTI)

?? This thesis is a feasibility study of avirtual power plant (VPP) in centralSweden and part of a project withInnoEnergy Instinct and STRI. The VPPconsists… (more)

Lundkvist, Johanna

2013-01-01T23:59:59.000Z

95

Final Report: Feasibility Study of Biomass in Snohomish County, Washington  

DOE Green Energy (OSTI)

This report and its attachments summarizes the results of a unique tribal-farmer cooperative study to evaluate the feasibility of building one or more regional anaerobic digestion systems in Snohomish County, Washington.

Daryl Williams (Tulalip Tribes); Ray Clark (Clark Group)

2005-01-31T23:59:59.000Z

96

hydropower | OpenEI  

Open Energy Info (EERE)

hydropower hydropower Dataset Summary Description No description given. Source National Renewable Energy Laboratory Date Released July 03rd, 2012 (2 years ago) Date Updated July 03rd, 2012 (2 years ago) Keywords biopower csp geothermal hydropower hydrothermal Renewable Energy Technical Potential rooftop United States utility-scale wind Data text/csv icon United States Renewable Energy Technical Potential (csv, 7.7 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote

97

Front Range Forest Health Partnership Phase 1 feasibility study  

DOE Green Energy (OSTI)

The Front Range Forest Health Partnership is an alliance of individuals, citizen groups, federal, state, private, and nonprofit organizations that formed to promote forest health restoration and reduce fire risks on Colorado's Front Range. The partnership promotes selective thinning to restore forest health and supports economically feasible end uses for wood waste materials. The Phase I study was initiated to determine the environmental and economic feasibility of using wood wastes from forested and urban areas for the production of fuel-grade ethanol.

Volkin, P

1998-09-01T23:59:59.000Z

98

Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1  

SciTech Connect

The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

King, J.W.

1993-08-01T23:59:59.000Z

99

Feasibility Study for Commercial Production of  

E-Print Network (OSTI)

· Meal · Biodiesel Plant site Requirements · Constraints for Biodiesel Plant · Economic · Environmental Growth 0 100000 200000 300000 400000 500000 600000 700000 1970 1980 1990 2000 2010 2020 2030 2040 Years Canyon Elmore Payette Gem Owyhee Ada Washington Courtesy Idaho Power Data #12;6 Study Area · The study

Kyte, Michael

100

HYPOGEN PRE-FEASIBILITY STUDY Final Report  

E-Print Network (OSTI)

. The report covers the co-production of hydrogen and electricity from fossil fuels and the capture and storage of European industry. Furthermore, it seems likely that off-the-shelf fossil fuel generating plants Studies (IPTS) commissioned this study on the HYPOGEN (HYdrogen POwer GENeration) concept, to its ESTO

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Wind Generation Feasibility Study in Bethel, AK  

DOE Green Energy (OSTI)

This report studies the wind resources in the Yukon-Kuskokwim Health Corporation (YKHC) region, located in southwestern Alaska, and the applicability of wind generation technologies to YKHC facilities.

Tom Humphrey, YKHC; Lance Kincaid, EMCOR Energy & Technologies

2004-07-31T23:59:59.000Z

102

New Bern Biomass to Energy Feasibility Study  

Science Conference Proceedings (OSTI)

The pulp and paper industry is the fourth largest consumer of energy in the United States. The industry recognizes that it can increase its energy production by increasing the utilization of available biomass resources, or by increasing the efficiency of available conversion technologies. Weyerhaeuser, Stone and Webster, Amoco, and Carolina Power & Light performed a detailed study of biomass gasification and enzymatic processing of biomass to ethanol. This evaluation assessed the potential of these techn...

1996-07-10T23:59:59.000Z

103

Mobile energy depot feasibility study: summary report  

DOE Green Energy (OSTI)

Declassified 28 Aug 1973. Various methods of producing and using nuclear power for military land vehicles and other military equipment were investigated and evaluated. A nuclear-powered mobile energy depot (MED) would move with advancing armies and produce vehicle fuels from materials readily available in the field. This would make mechanized units independent of external fuel supplies for extended periods, and permit them to move quickly and easily to areas impossible for units that depend on the customary fuel supply lines. Many possible MED systems were evaluated on the basis of energy sources, fuel manufacturing (by both conventional and chemonuclear processes), fuel storage and transportation, and fuel utilization in both present-day internal-combustion engines and power units of the future (i.e., fuel cells). The applications of more than a dozen MED systems to vehicular propulsion were studied. (auth)

Burwell, S.B.; Carlson, J.A.; Clark, R.G.; Donelan, L.E.; Erwin, A.F.; Grimes, P.G.; Jasinski, R.J.; Kruzic, T.P.; Manion, J.P.; Rohowetz, S.E.; Sollenberger, C.L.; Thompkins, J.F.

1962-07-13T23:59:59.000Z

104

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This report provides a round up of the background, development, discussions, and results from an EPRI-sponsored industry workshop, Hydropower in a Carbon-Constrained FutureOpportunities and Challenges. The workshop was held on January 30 31, 2008, at EPRI's Knoxville, Tennessee, offices.

2008-03-27T23:59:59.000Z

105

CsIX/TRU Grout Feasibility Study  

SciTech Connect

A settlement agreement between the Department of Energy (DOE) and the State of Idaho mandates that liquid waste now stored at the Idaho Nuclear Technology Engineering Center (INTEC - formerly the Idaho Chemical Processing Plant, ICPP) will be calcined by the end of year 2012. This study investigates an alternative treatment of the liquid waste that removes undissolved solids (UDS) by filtration and removes cesium by ion exchange followed by cement-based grouting of the remaining liquid into 55-gal drums. Operations are assumed to be from January 2008 through December 2012. The grouted waste will be contact-handled and will be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal. The small volume of secondary wastes such as the filtered solids and cesium sorbent (resin) would remain in storage at the Idaho National Engineering and Environmental Laboratory for treatment and disposal under another project, with an option to dispose of the filtered solids as a r emote-handled waste at WIPP.

S. J. Losinski; C. M. Barnes; B. K. Grover

1998-11-01T23:59:59.000Z

106

DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry Proposals for Feasibility Study to Produce Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants April 13, 2006 - 10:19am Addthis WASHINGTON, DC - In support of President Bush's Advanced Energy Initiative (AEI), Secretary of Energy Samuel W. Bodman today announced that the U.S. Department of Energy (DOE) will allocate up to $1.6 million this year to fund industry studies on the best ways to utilize energy from existing commercial nuclear reactors for production of hydrogen in a safe and environmentally-sound manner. DOE is seeking industry proposals for these Federal Financial Assistance Awards, worth up to 80 percent of the total

107

NETL: Gasification - Feasibility Studies to Improve Plant Availability and  

NLE Websites -- All DOE Office Websites (Extended Search)

Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in IGCC Plants Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in IGCC Plants General Electric Company Project Number: FE0007859 Project Description General Electric Company (GE) is studying the feasibility of improving plant availability and reducing total installed costs in Integrated Gasification Combined Cycle (IGCC) plants. GE is evaluating the IGCC technology effects of total installed cost and availability through deployment of a multi-faceted approach in technology evaluation, constructability, and design methodology. Eastman Chemical Company will be supporting the GE effort on certain technologies by providing consulting on the evaluations and technology transfer phases of the project. The end result is aimed at reducing the time to technological maturity and enabling plants to reach higher values of availability in a shorter period of time and at a lower installed cost.

108

Applicant Location Requested DOE Funds Project Summary Feasibility Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requested Requested DOE Funds Project Summary Feasibility Studies Confederated Salish and Kootenai Tribes Pablo, MT $850,000 This project will evaluate the technical and economic viability of a co-generation biomass fuel power plant. The plant would use fuels from tribal forest management activities to provide between 2.5 to 20 megawatts (MW) of electricity to heat tribal buildings or sell on the wholesale market. Standing Rock Sioux Tribe Fort Yates, ND $430,982 This project will perform a feasibility study over the course of two years on three tribal sites to support the future development of 50 to 100 MW of wind power. Navajo Hopi Land Commission (NHLCO), Navajo Nation Window Rock, AZ $347,090 This project will conduct a feasibility study to explore potential

109

ARM - Field Campaign - IR Cloud Camera Feasibility Study  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsIR Cloud Camera Feasibility Study govCampaignsIR Cloud Camera Feasibility Study Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : IR Cloud Camera Feasibility Study 2010.12.06 - 2010.12.13 Lead Scientist : Kyle Leesman For data sets, see below. Description During December 2010, a prototype LWIR cloud camera system was deployed at the Southern Great Plains Guest Instrument Facility (SGP-GIF). The system consisted of a microbolometer camera (~7-15 ìm) to capture sky imagery, a blackbody calibration source, and a GPS receiver used to estimate atmospheric column water vapor and constrain atmospheric compensation. The camera system collected calibrated sky radiance images co-incident with the SGP Central Facility with the goal of quantitatively assessing its ability

110

Berlin, Maryland, district heating assessment program. Feasibility study  

DOE Green Energy (OSTI)

Ebasco conducted the technical and economic portion of this study to determine the feasibility of constructing a district heating system with a geothermal energy source for the town of Berlin, Maryland. The Berlin District Heating Assessment Work Group (DHAWG) provided the information on the energy needs of all potential users. Previous work was used to estimate the potential geothermal energy available beneath the town. A computer program, GRITS, developed by JHU was also used to evaluate various district heating systems that would satisfy the town's needs. It is concluded that a district heating system is technically and economically feasible based on the criteria and data used in this study.

Not Available

1982-09-01T23:59:59.000Z

111

Remote Sensing of Railroad Locomotive Emissions: A Feasibility Study  

E-Print Network (OSTI)

Remote Sensing of Railroad Locomotive Emissions: A Feasibility Study Peter J. Popp, Gary A. Bishop, DC 20590 #12;Remote Sensing of Railroad Engine Emissions 2 INTRODUCTION Many cities in the United be #12;Remote Sensing of Railroad Engine Emissions 3 operated at a preset power output and fixed engine

Denver, University of

112

Pueblo of Laguna Utility Authority Renewable Energy Feasibility Study  

DOE Green Energy (OSTI)

The project, “Renewable Energy Feasibility Study” was designed to expand upon previous work done by the Tribe in evaluating utility formation, generation development opportunities, examining options for creating self-sufficiency in energy matters, and integrating energy management with the Tribe’s economic development goals. The evaluation of project locations and economic analysis, led to a focus primarily on solar projects.

Carolyn Stewart, Red Mountain Tribal Energy

2008-03-31T23:59:59.000Z

113

Small modular biopower initiative Phase 1 feasibility studies executive summaries  

DOE Green Energy (OSTI)

The Phase 1 objective is a feasibility study that includes a market assessment, resource assessment, preliminary system design, and assessment of relevant environmental and safety considerations, and evaluation of financial and cost issues, and a preliminary business plan and commercialization strategy. Each participating company will share at least 20% of the cost of the first phase.

Bain, R.

2000-03-06T23:59:59.000Z

114

Staging and storage facility feasibility study. Final report  

SciTech Connect

This study was performed to investigate the feasibility of adapting the design of the HWVP Canister Storage Building (CSB) to meet the needs of the WHC Spent Nuclear Fuel Project for Staging and Storage Facility (SSF), and to develop Rough Order of Magnitude (ROM) cost and schedule estimates.

Swenson, C.E. [Westinghouse Hanford Co., Richland, WA (United States)

1995-02-01T23:59:59.000Z

115

Feasibility and limitation of track studies using atomic force microscopy  

E-Print Network (OSTI)

Feasibility and limitation of track studies using atomic force microscopy D. Nikezic, J.P.Y. Ho, C.W.Y. Yip, V.S.Y. Koo, K.N. Yu * Department of Physics and Materials Science, City University of Hong Kong July 2002 Abstract Atomic force microscopy (AFM) has been employed to investigate characteristics

Yu, K.N.

116

NREL: Learning - Pumped Hydropower  

NLE Websites -- All DOE Office Websites (Extended Search)

Pumped Hydropower Pumped Hydropower Pumped hydro facilities use off-peak electricity to pump water from a lower reservoir into one at a higher elevation. When the water stored in the upper reservoir is released, it is passed through hydraulic turbines to generate electricity. The off-peak electrical energy used to pump the water up hill can be stored indefinitely as gravitational energy in the upper reservoir. Thus, two reservoirs in combination can be used to store electrical energy for a long period of time, and in large quantities. Utilities generally prefer to operate large coal and nuclear power stations at full power all the time (referred to as "baseload generation"), so in the middle of the night, these plants often produce more power than is needed. Pumped hydro energy storage can be used to smooth out the demand

117

Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants  

DOE Green Energy (OSTI)

Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

Douglas G. Hall

2006-01-01T23:59:59.000Z

118

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Report test Resource Assessment report (main) - PDF format Appendix A - Summary Report Appendix B - RIver Basins Report Appendix C - Site List Appendix D - Individual...

119

Conventional Hydropower Technologies (Fact Sheet)  

SciTech Connect

The US Department of Energy conducts research on conventional hydropower technologies to increase generation and improve existing means of generating hydroelectricity.

2010-07-01T23:59:59.000Z

120

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

upon it's completion. If a state resource assessment report is needed please contact INL through the "Send Email" link. Contact: Hydropower, Send E-mail Last Updated: Tuesday,...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

New Mexico Central Station Solar Power: Feasibility Study  

Science Conference Proceedings (OSTI)

A feasibility study was performed for a 50 to 500 megawatts central station solar power (CSSP) plant to be developed in New Mexico by mid-2011. The project participants included the Public Service Company of New Mexico (PNM), El Paso Electric (EPE), San Diego Gas Electric (SDGE), Southern California Edison (SCE), Tri-State Generation Transmission Association (TSGT), and Xcel Energy. The scope of the study included performing site and technology assessments, analyzing technology-specific design and perfor...

2008-03-31T23:59:59.000Z

122

Large-Scale Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

hydropower projects can also be built as power storage facilities. During periods of peak electricity demand, these facilities operate much like a traditional hydropower...

123

“Sustainable development of hydropower in third countries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

&8220;Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development,...

124

Idaho National Laboratory - Hydropower Program: Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower Hydropower Document Archive The following reports, articles, and publications are...

125

Fact Sheet: Sustainable Development of Hydropower Initiative...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainable Development of Hydropower Initiative Fact Sheet: Sustainable Development of Hydropower Initiative A fact sheet detailling the mission behind the Clean Energy...

126

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Undeveloped Hydropower Potential by State The Department of Energy is performing a resource assessment of the undeveloped conventional hydropower potential in the U.S. (Undeveloped...

127

Encoal mild coal gasification project: Commercial plant feasibility study  

SciTech Connect

In order to determine the viability of any Liquids from Coal (LFC) commercial venture, TEK-KOL and its partner, Mitsubishi Heavy Industries (MHI), have put together a technical and economic feasibility study for a commercial-size LFC Plant located at Zeigler Coal Holding Company`s North Rochelle Mine site. This resulting document, the ENCOAL Mild Coal Gasification Plant: Commercial Plant Feasibility Study, includes basic plant design, capital estimates, market assessment for coproducts, operating cost assessments, and overall financial evaluation for a generic Powder River Basin based plant. This document and format closely resembles a typical Phase II study as assembled by the TEK-KOL Partnership to evaluate potential sites for LFC commercial facilities around the world.

1997-07-01T23:59:59.000Z

128

Feasibility Study for a Hopi Utility-Scale Wind Project  

DOE Green Energy (OSTI)

The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

Kendrick Lomayestewa

2011-05-31T23:59:59.000Z

129

DOE Hydropower Program Annual Report for FY 2002  

SciTech Connect

The U.S. Department of Energy (DOE) conducts research on advanced hydropower technology through its hydropower program, which is organized under the Office of Wind and Hydropower Technologies within the Office of Energy Efficiency and Renewable Energy. This annual report describes the various projects supported by the hydropower program in FY 2002. The program=s current focus is on improving the environmental performance of hydropower projects by addressing problems such as fish mortality during passage through turbines, alteration of instream habitat, and water quality in tailwaters. A primary goal of this research is to develop new, environmentally friendly technology. DOE-funded projects have produced new conceptual designs for turbine systems, and these are now being tested in pilot-scale laboratory tests and in the field. New design approaches range from totally new turbine runners to modifications of existing designs. Biological design criteria for these new turbines have also been developed in controlled laboratory tests of fish response to physical stresses, such as hydraulic shear and pressure changes. These biocriteria are being combined with computational tools to locate and eliminate areas inside turbine systems that are damaging to fish. Through the combination of laboratory, field, and computational studies, new solutions are being found to environmental problems at hydropower projects. The diverse program activities continue to make unique contributions to clean energy production in the U.S. By working toward technology improvements that can reduce environmental problems, the program is helping to reposition hydropower as an acceptable, renewable, domestic energy choice.

Garold L. Sommers; R. T. Hunt

2003-07-01T23:59:59.000Z

130

Applicant DOE Award Project Location Project Focus Feasibility Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

buildings and assist the Tribe's efforts to buildings and assist the Tribe's efforts to reduce the amount of energy used in their buildings. The Sea Lion Corporation $200,000 Hooper Bay, AK The project will train staff members to become energy assessors and weatherization technicians who specialize in energy efficient building construction and energy saving technologies. A feasibility study will also be conducted to determine how to achieve a 30 percent reduction in residential and commercial energy use and show the economic benefits of energy efficiency. Coeur d'Alene Tribe $163,952 Plummer, ID This project will assess and determine the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The goal is to

131

Substation automation feasibility study. Final report. Export trade information  

SciTech Connect

This study, conducted by Macro Corporation, was funded by the U.S. Trade and Development Agency, on behalf of the Polish Power Grid Company. The report shows the results of a feasibility study for the implementation of substation automation on the company`s high-voltage transmission network. The report is aimed at providing a technical-economic assessment of modernizing the monitoring, protection, and control systems in the major transmission substations. The report is divided into the following sections: (1) Introduction; (2) Existing Situation And Assessment Of Operational Needs; (3) Functional Requirements; (4) Implementation Options and Costs; (5) Guidelines for Staged Implementation; (6) Conclusions and Recommendations.

1995-07-01T23:59:59.000Z

132

Feasibility study for mega-electron-volt electron beam tomography  

SciTech Connect

Electron beam tomography is a promising imaging modality for the study of fast technical processes. But for many technical objects of interest x rays of several hundreds of keV energy are required to achieve sufficient material penetration. In this article we report on a feasibility study for fast electron beam computed tomography with a 1 MeV electron beam. The experimental setup comprises an electrostatic accelerator with beam optics, transmission target, and a single x-ray detector. We employed an inverse fan-beam tomography approach with radiographic projections being generated from the linearly moving x-ray source. Angular projections were obtained by rotating the object.

Hampel, U. [Institute of Fluid Dynamics, Helmholtz-Zentrum Dresden-Rossendorf, Bautzner Landstrasse 400, 01328 Dresden (Germany); AREVA Endowed Chair of Imaging Techniques in Energy and Process Engineering, Technische Universitaet Dresden, 01062 Dresden (Germany); Baertling, Y.; Hoppe, D. [Institute of Fluid Dynamics, Helmholtz-Zentrum Dresden-Rossendorf, Bautzner Landstrasse 400, 01328 Dresden (Germany); Kuksanov, N.; Fadeev, S.; Salimov, R. [Budker Institute of Nuclear Physics of Siberian Branch of Russian Academy of Science, Lavrentiev av. 11, Novosibirsk 630090 (Russian Federation)

2012-09-15T23:59:59.000Z

133

Feasibility Study for Operable Unit 7-13/14  

SciTech Connect

The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

K. Jean Holdren

2007-05-29T23:59:59.000Z

134

Feasibility Study: Potential Enhancements for the LLNL Renewables Website  

DOE Green Energy (OSTI)

This feasibility study investigates additional improvements/extensions to the LLNL Renewables Website. Currently, the Renewables Website focuses on wind energy in California. Future enhancements will include other renewable energy sources. The extensions described below are focused along two separate yet related avenues: (1) Forecasting wildfire risk in the regions of California where new development may occur, as a part of the 'Million Solar Roofs' program. (2) Gaining a better understanding of the ecological components and potential of biofuels from forests in California. These two avenues are further described in the report. Following is a technical description of the Center for Fire Research and Outreach computing and web service capabilities.

Kearns, F; Krawchuk, M; Moritz, M; Stephens, S; Goldstein, N

2008-01-25T23:59:59.000Z

135

Feasibility Study of Biomass Electrical Generation on Tribal Lands  

DOE Green Energy (OSTI)

The goals of the St. Croix Tribe are to develop economically viable energy production facilities using readily available renewable biomass fuel sources at an acceptable cost per kilowatt hour ($/kWh), to provide new and meaningful permanent employment, retain and expand existing employment (logging) and provide revenues for both producers and sellers of the finished product. This is a feasibility study including an assessment of available biomass fuel, technology assessment, site selection, economics viability given the foreseeable fuel and generation costs, as well as an assessment of the potential markets for renewable energy.

Tom Roche; Richard Hartmann; Joohn Luton; Warren Hudelson; Roger Blomguist; Jan Hacker; Colene Frye

2005-03-29T23:59:59.000Z

136

Southern thailand coal fired project: Feasibility study. Export trade information  

SciTech Connect

This study, conducted by Black & Veatch International, was funded by the U.S. Trade and Development Agency. The report addresses various technical, environmental, and economic aspects of developing four 1,000 MW units of coal fired electric generating facilities at a site near Prachuap Khiri Khan. The study includes a cost estimate for the units and the fuel delivery port as well as the major conceptual design decisions made for the project. This volume of the report is the Feasibility Study and is divided into the following sections: (1) Introduction/Summary; (2) Generation Planning Study; (3) Site Selection Study; (4) Project Description; (5) Fuel Resource Assessment; (6) Water Resource Assessment; (7) Technical Information to Support the Environmental Impact Assessment; (8) Plant Conceptual Design; (9) Transmission Interconnection; (10) Project Capital Cost Estimate; (11) Project Schedule; (12) Project Implementation Plan; (13) Project Risk Analysis.

1995-09-01T23:59:59.000Z

137

Microsoft Word - FINAL Hydropower Conference Agenda 2009 060209...  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2009 - Direct Funding - Federal Hydropower Appropriations - Wind Power Leveraging of Federal Hydropower Assets - Federal Hydropower's Place...

138

Economic and technical feasibility study of compressed air storage  

DOE Green Energy (OSTI)

The results of a study of the economic and technical feasibility of compressed air energy storage (CAES) are presented. The study, which concentrated primarily on the application of underground air storage with combustion turbines, consisted of two phases. In the first phase a general assessment of the technical alternatives, economic characteristics and the institutional constraints associated with underground storage of compressed air for utility peaking application was carried out. The goal of this assessment was to identify potential barrier problems and to define the incentive for the implementation of compressed air storage. In the second phase, the general conclusions of the assessment were tested by carrying out the conceptual design of a CAES plant at two specific sites, and a program of further work indicated by the assessment study was formulated. The conceptual design of a CAES plant employing storage in an aquifer and that of a plant employing storage in a conventionally excavated cavern employing a water leg to maintain constant pressure are shown. Recommendations for further work, as well as directions of future turbo-machinery development, are made. It is concluded that compressed air storage is technically feasible for off-peak energy storage, and, depending on site conditions, CAES plants may be favored over simple cycle turbine plants to meet peak demands. (LCL)

Not Available

1976-03-01T23:59:59.000Z

139

NETL: News Release - DOE Releases Feasibility Study for Conceptual  

NLE Websites -- All DOE Office Websites (Extended Search)

21 , 2007 21 , 2007 DOE Releases Feasibility Study for Conceptual Coal-to-Liquids Facility in Midwest Report Outlines the Path Toward Future Domestic Energy Facilities WASHINGTON, DC - The Office of Fossil Energy's National Energy Technology Laboratory has issued a report that examines the feasibility of a commercial 50,000 barrel per day coal-to-liquids (CTL) facility in the Illinois coal basin. The conceptual design study provides a performance baseline that can be used to show how CTL could capitalize on domestic energy resources while providing a much-needed bulwark against rising petroleum and natural gas prices. The price of coal-derived liquid fuels has traditionally been unable to compete with the price of fuels derived from crude oil. As oil prices continue to rise, however, domestic sources of transportation fuels are becoming more affordable. The economic and national security concerns related to non-domestic liquid fuels have more eyes turning to alternative sources of liquid fuels, and, with coal being America's most abundant energy resource, CTL facilities may provide a winning option.

140

Battery energy storage market feasibility study -- Expanded report  

DOE Green Energy (OSTI)

Under the sponsorship of the US Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the battery energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed battery storage as an important technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

Kraft, S. [Frost and Sullivan, Mountain View, CA (United States); Akhil, A. [Sandia National Labs., Albuquerque, NM (United States). Energy Storage Systems Analysis and Development Dept.

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Anticipatory precrash restraint sensor feasibility study: Final report  

SciTech Connect

This report explores feasibility of an anticipatory precrash restraint sensor. The foundation principle is the anticipation mechanism found at a primitive level of biological intelligence and originally formalized by the mathematical biologist Robert Rosen. A system based on formal anticipatory principles should significantly outperform conventional technologies. It offers the prospect of high payoff in prevention of death and injury. Sensors and processes are available to provide a good, fast, and inexpensive description of the present dynamical state of the vehicle to the embedded system model in the anticipation engine. The experimental part of this study found that inexpensive radar in a real-world setting does return useful data on target dynamics. The data produced by a radar system can be converted to target dynamical information by good, fast and inexpensive signal-processing techniques. Not only is the anticipatory sensor feasible, but further development under the sponsorship of the National Highway Traffic Safety Administration is necessary and desirable. There are a number of possible lines of follow-on investigation. The level of effort and expected benefits of various alternatives are discussed.

Kercel, S.W.; Dress, W.B.

1995-08-01T23:59:59.000Z

142

Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park.

143

Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar  

DOE Green Energy (OSTI)

Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

Suzanne McSawby, Project Director

2008-12-31T23:59:59.000Z

144

Hydropower Technology Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

145

Hydropower Technology Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

146

Feasibility design study. Land-based OTEC plants. Final report  

DOE Green Energy (OSTI)

The purpose of this study has been to determine the feasibility of installing 10 MWe (MegaWatt-electric) and 40 MWe land-based OTEC demonstration power plants at two specific sites: Keahole Point on the western shore of the island of Hawaii; and Punta Tuna, on the southeast coast of the main island of Puerto Rico. In addition, the study has included development of design parameters, schedules and budgets for the design, construction and operation of these plants. Seawater systems (intake and discharge pipes) were to be sized so that flow losses were equivalent to those expected with a platform-based OTEC power plant. The power module (components and general arrangement was established based on the TRW design. Results are presented in detail. (WHK)

Brewer, J. H.; Minor, J.; Jacobs, R.

1979-01-01T23:59:59.000Z

147

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

148

Hydropower Potential in the Western U.S. | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Potential in the Western U.S. Hydropower Potential in the Western U.S. Energy Data Apps Maps Challenges Resources Blogs Let's Talk Energy Beta You are here Data.gov » Communities » Energy » Data Hydropower Potential in the Western U.S. Dataset Summary Description The dataset includes design elements, installed capacity, production capability, associated costs and cost -to-benefit ratios for nearly 200 water storing and conveying structures currently maintained by the Bureau of Reclamation. These data were used to support the internal study and report for assessing hydropower capability at 70 of Reclamation's existing facilities where hydropower has not been developed. The dataset can further be leveraged to support applications designed to provide a better understanding of our hydropower production potential and resource utilization.

149

Feasibility Study for Renewable Energy Development on Tribal Lands  

DOE Green Energy (OSTI)

Project Objective: The Mississippi Band of Choctaw Indians (MBCI) conducted a study of the feasibility of siting a renewable energy biomass-based installation on tribal lands. The purpose of the study was to determine whether such an installation can be economically sustainable, as well as consistent with the cultural, social, and economic goals of the Tribe. Scope: To achieve the goal of the feasibility study, the following tasks were carried out: (1) Resource availability assessment--The objective of this assessment was to determine the availability of both poultry litter and wood residues for use in the proposed facility. (2) Power utilization assessment--The objective of this assessment was to determine the potential market size for power produced, the existing infrastructure for delivering power to that market, and the costs and economic returns for doing so. (3) Technology review--The objective of this review was to identify one, or more, technical options for detailed economic and technical assessment. The study considered a range of feedstock and product mixtures of poultry litter; wood residues as feedstock; and electrical power and other ancillary products as outputs. Distributed power sources was also examined. Technologies ranging from gasification to systems that produce both power and value-added chemicals were considered. Technologies selected for detailed review were those that can be sized to process the amount of available feed (poultry litter, or poultry litter and wood residues), and that also appear to make economic sense in terms of the value of their inputs. The technology review leaned heavily on the experience from similar prior DOE projects, particularly those conducted by the National Renewable Energy Laboratory (NREL). NREL was involved in a consultative role, so that the project team could leverage their experience. (4) Systems Design(s)--Based on the technology review, a pre-conceptual design for an installation was developed. This included identification of unit operations and equipment, maintenance, manpower, feedstock requirements, and output (power and any other ancillary products). Energy and mass flows were identified. (5) Manpower development assessment--The objectives of this assessment was to identify training needs for the selected option(s), and determine how they can best be met. Using the manpower estimates from the pre-conceptual system design, skills and training needs were to be identified. A plan for providing the needed manpower was to be developed, and any associated costs determined. (6) Economic assessment--The objective of this assessment was to determine the economic viability and sustainability of the technology option(s) identified through the technical review option. The costs of bringing the feedstock to the proposed facility were combined with nominal operation costs and potential production distribution costs to identify total costs. Revenue from power distribution (and, possibly, from sale of ancillary products) were combined with any possible government credits or payments to identify gross revenue. Economic viability was determined by net revenue and return on investment. A business plan for the selected option was to be produced that would consider long-term sustainability of the project. (7) MBCI compatibility assessment--The objective of this assessment was to determine whether the renewable energy technology was compatible with the MBCI's cultural, social and economic values. As part of this assessment, the environmental impacts and benefits were to be determined (Environmental stewardship is an important part of the Choctaw culture.). The effects of a project on employment were projected. The compatibility of the renewable energy project with MBCI cultural and social values were determined. Most importantly, the compatibility of the renewable energy installation with the MBCIs economic development goals and directions were determined. A project team led by the Mississippi Band of Choctaw Indians (MBCI) conducted the feasibility study. The team included th

John Hendrix, Project Director; Charles Weir, Project Manager; Dr. John Plodinec, Technology Advisor; Dr. Steve Murray, Economic Advisor

2005-07-21T23:59:59.000Z

150

Canton hydroelectric project: feasibility study. Final report, appendices  

DOE Green Energy (OSTI)

These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

Not Available

1979-05-01T23:59:59.000Z

151

Final Report - Wind and Hydro Energy Feasibility Study - June 2011  

DOE Green Energy (OSTI)

This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

Jim Zoellick; Richard Engel; Rubin Garcia; Colin Sheppard

2011-06-17T23:59:59.000Z

152

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

Aspects General Environmental Research Hydrokinetic & Wave Technologies Hydropower Facts Research and Development Resource Assessment Technology Transfer Virtual...

153

Feasibility study of geothermal heating, Modoc Lassen housing project  

DOE Green Energy (OSTI)

This study evaluates the feasibility of using geothermal water for space and domestic water heating systems at the elderly housing project now ready for construction at the Modoc Lassen Indian Reservation. For the six units considered, the space heating load is four times the domestic water heating load. Since the geothermal water temperature is uncertain, two scenarios were evaluated. In the first, which assumes 160/sup 0/F supply temperature, the geothermal system is assumed to satisfy the entire space and domestic water heating loads. In the second, which assumes the supply temperature to be less than 120/sup 0/F at the wellhead only space heating is provided. The economics of the first scenario are quite favorable. The additional expenditure of $15,630 is projected to save $3522 annually at current energy costs, and the life cycle cost study projects a discounted rate of return on the investment of 44.4%. Surprisingly, the investment is even more favorable for the second scenario, due to the higher cost and lower resultant savings for the domestic water components. Forced air space heating from geothermal is recommended. Domestic water heating is recommended pending additional information on supply water temperature.

Not Available

1981-11-01T23:59:59.000Z

154

Hydropower Resource Assessment Modeling Results  

DOE Green Energy (OSTI)

The Hydropower Evaluation Software uses the Federal Energy Regulatory Commission?s Hydroelectric Power Resource Assessment database to identify sites with undeveloped hydropower capacity and the estimated megawatts of undeveloped capacity at each site. The software integrates this information with environmental values from the National Park Service?s National Rivers Inventory database. Other constraints to development that are modeled include Federal and state legislative protection for river segments that have been identified as being wild and scenic river segments. River segments containing threatened and/or endangered wildlife and fish are also modeled for their influence on hydropower development. The amount that each attribute affects the likelihood of development is dependent on the prior development of a site.

A. M. Conner; J. E. Francfort

1999-07-06T23:59:59.000Z

155

DOE: Quantifying the Value of Hydropower in the Electric Grid  

SciTech Connect

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

None

2012-12-31T23:59:59.000Z

156

Feasibility study of medical isotope production at Sandia National Laboratories  

Science Conference Proceedings (OSTI)

In late 1994, Sandia National Laboratories in Albuquerque, New Mexico, (SNL/NM), was instructed by the Department of Energy (DOE) Isotope Production and Distribution Program (IPDP) to examine the feasibility of producing medically useful radioisotopes using the Annular Core Research Reactor (ACRR) and the Hot Cell Facility (HCF). Los Alamos National Laboratory (LANL) would be expected to supply the targets to be irradiated in the ACRR. The intent of DOE would be to provide a capability to satisfy the North American health care system demand for {sup 99}Mo, the parent of {sup 99m}Tc, in the event of an interruption in the current Canadian supply. {sup 99m}Tc is used in 70 to 80% of all nuclear medicine procedures in the US. The goal of the SNL/NM study effort is to determine the physical plant capability, infrastructure, and staffing necessary to meet the North American need for {sup 99}Mo and to identify and examine all issues with potential for environmental impact.

Massey, C.D.; Miller, D.L.; Carson, S.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Regulatory Assessment Dept.] [and others

1995-12-01T23:59:59.000Z

157

Fort Yukon, Chalkyitsik, & Venetie Biomass Boiler Feasibility Study  

SciTech Connect

The Council of Athabascan Tribal Governments (CATG) is a consortium of ten Gwich'in and Koyukon Athabascan tribes settled in 10 remote villages and are linked by the Yukon River System. The CATG mission is to maintain the Yukon Flats region as Indian Country by asserting traditional rights and taking responsibility for developing tribal technical capacity to manage the land and resources. It is the intent of CATG to explore and develop all opportunities for a renewable and self-sufficient energy program for each of the villages. CATG envisions utilization of forest resources both for construction and energy as one of the best long-term strategies for integrating the economic goals for the region as well as supporting the cultural and social issues. The intent for this feasibility project is to focus specifically on biomass utilization for heat, first, and for future electrical generation within the region, second. An initial determination has already been made regarding the importance of wood energy as a primary source of renewable energy to displace diesel fuel in the Yukon Flats region. A desktop study of other potential renewable resources was conducted in 2006.

Greg Koontz, ME William A. Wall, PhD

2009-03-31T23:59:59.000Z

158

Majorana One-Tonne Cryostat Cooling Conceptual Feasibility Study  

SciTech Connect

This report evaluates the conceptual plans for a one-tonne (S4) cryostat cooling design. This document is based upon previous design work and experimental results used to evaluate the current MAJORANA DEMONSTRATOR (MJD) thermal design. A feasibility study of a cooling system for S4 based on the MJD thermosyphon experiment is presented. The one-tonne experiment will be a scaled up version of the MJD. There will be many cryostats for the S4 experiment. In this document a cryostat with up to 19 strings of Germanium crystals is analyzed. Aside from an extra outer ring of crystals, the geometry of both systems’ cryostats is very similar. The materials used in the fabrication of both ultra-low background experiments will be underground electroformed copper. The current MJD uses a two-phase liquid-gas cooling system to ensure constant operating temperature. This document presents a theoretical investigation of a cooling system for the S4 experiment and evaluates the heat transfer performance requirements for such a system.

Reid, Douglas J.; Orrell, John L.; Fast, James E.; Aguayo Navarrete, Estanislao

2011-02-17T23:59:59.000Z

159

Revised CTUIR Renewable Energy Feasibility Study Final Report  

DOE Green Energy (OSTI)

Engineering (DOSE). This analysis focused primarily identifying renewable resources that may be applied on or near the Umatilla Indian Reservation. In addition preliminary technical and economic feasibility of developing renewable energy resources have been prepared and initial land use planning issues identified. Renewable energies examined in the course of the investigation included solar thermal, solar photovoltaic, wind, bioethanol, bio-diesel and bio-pellet fuel. All renewable energy options studied were found to have some potential for the CTUIR. These renewable energy options are environmentally friendly, sustainable, and compliment many of the policy goals of the CTUIR. This report seeks to provide an overall review of renewable energy technologies and applications. It tries to identify existing projects near to the CTUIR and the efforts of the federal government, state government and the private sector in the renewable energy arena. It seeks to provide an understanding of the CTUIR as an energy entity. This report intends to provide general information to assist tribal leadership in making decisions related to energy, specifically renewable energy deve lopment.

John Cox; Thomas Bailor; Theodore Repasky; Lisa Breckenridge

2005-10-31T23:59:59.000Z

160

Revised CTUIR Renewable Energy Feasibility Study Final Report  

SciTech Connect

This preliminary assessment of renewable energy resources on the Umatilla Indian Reservation (UIR) has been performed by CTUIR Department of Science and Engineering (DOSE). This analysis focused primarily identifying renewable resources that may be applied on or near the Umatilla Indian Reservation. In addition preliminary technical and economic feasibility of developing renewable energy resources have been prepared and initial land use planning issues identified. Renewable energies examined in the course of the investigation included solar thermal, solar photovoltaic, wind, bioethanol, bio-diesel and bio-pellet fuel. All renewable energy options studied were found to have some potential for the CTUIR. These renewable energy options are environmentally friendly, sustainable, and compliment many of the policy goals of the CTUIR. This report seeks to provide an overall review of renewable energy technologies and applications. It tries to identify existing projects near to the CTUIR and the efforts of the federal government, state government and the private sector in the renewable energy arena. It seeks to provide an understanding of the CTUIR as an energy entity. This report intends to provide general information to assist tribal leadership in making decisions related to energy, specifically renewable energy deve lopment.

John Cox; Thomas Bailor; Theodore Repasky; Lisa Breckenridge

2005-10-31T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Feasibility study of tank leakage mitigation using subsurface barriers  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has established the Tank Waste Remediation System (TWRS) to satisfy manage and dispose of the waste currently stored in the underground storage tanks. The retrieval element of TWRS includes a work scope to develop subsurface impermeable barriers beneath SSTs. The barriers could serve as a means to contain leakage that may result from waste retrieval operations and could also support site closure activities by facilitating cleanup. Three types of subsurface barrier systems have emerged for further consideration: (1) chemical grout, (2) freeze walls, and (3) desiccant, represented in this feasibility study as a circulating air barrier. This report contains analyses of the costs and relative risks associated with combinations retrieval technologies and barrier technologies that from 14 alternatives. Eight of the alternatives include the use of subsurface barriers; the remaining six nonbarrier alternative are included in order to compare the costs, relative risks and other values of retrieval with subsurface barriers. Each alternative includes various combinations of technologies that can impact the risks associated with future contamination of the groundwater beneath the Hanford Site to varying degrees. Other potential risks associated with these alternatives, such as those related to accidents and airborne contamination resulting from retrieval and barrier emplacement operations, are not quantitatively evaluated in this report.

Treat, R.L.; Peters, B.B.; Cameron, R.J.; McCormak, W.D.; Trenkler, T.; Walters, M.F. [Ensearch Environmental, Inc. (United States); Rouse, J.K.; McLaughlin, T.J. [Bovay Northwest, Inc., Richland, WA (United States); Cruse, J.M. [Westinghouse Hanford Co., Richland, WA (United States)

1994-09-21T23:59:59.000Z

162

Fort Yukon, Chalkyitsik, & Venetie Biomass Boiler Feasibility Study  

SciTech Connect

The Council of Athabascan Tribal Governments (CATG) is a consortium of ten Gwich'in and Koyukon Athabascan tribes settled in 10 remote villages and are linked by the Yukon River System. The CATG mission is to maintain the Yukon Flats region as Indian Country by asserting traditional rights and taking responsibility for developing tribal technical capacity to manage the land and resources. It is the intent of CATG to explore and develop all opportunities for a renewable and self-sufficient energy program for each of the villages. CATG envisions utilization of forest resources both for construction and energy as one of the best long-term strategies for integrating the economic goals for the region as well as supporting the cultural and social issues. The intent for this feasibility project is to focus specifically on biomass utilization for heat, first, and for future electrical generation within the region, second. An initial determination has already been made regarding the importance of wood energy as a primary source of renewable energy to displace diesel fuel in the Yukon Flats region. A desktop study of other potential renewable resources was conducted in 2006.

Greg Koontz, ME William A. Wall, PhD

2009-03-31T23:59:59.000Z

163

Program to investigate the engineering feasibility of extracting energy from shallow magma bodies  

SciTech Connect

A new program, sponsored by the Department of Energy's Geothermal and Hydropower Technologies Division, has begun to investigate the engineering feasibility of extracting energy from shallow magma bodies. This program follows a previous investigation of the scientific feasibility of using magma and differs from it in focus. The current program is directed toward determining whether magma energy can be extracted economically. In the first year of the program, the three most promising sites for a long term experiment will be characterized; the research and development tasks that will be required will be identified; and a program plan outlining the entire feasibility study will be compiled.

Carson, C.C.; Allen, A.D.

1984-01-01T23:59:59.000Z

164

US hydropower resource assessment for Hawaii  

DOE Green Energy (OSTI)

US DOE is developing an estimate of the undeveloped hydropower potential in US. The Hydropower Evaluation Software (HES) is a computer model developed by INEL for this purpose. HES measures the undeveloped hydropower resources available in US, using uniform criteria for measurement. The software was tested using hydropower information and data provided by Southwestern Power Administration. It is a menu-driven program that allows the PC user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes, and generate reports. This report describes the resource assessment results for the State of Hawaii.

Francfort, J.E.

1996-09-01T23:59:59.000Z

165

Comprehensive Renewable Energy Feasibility Study for Sealaska Corporation  

DOE Green Energy (OSTI)

The purposes of this project were: (1) to conduct a comprehensive feasibility study to determine the potential sustainability of wind and/or small hydroelectric power plants on Southeast Alaska native village lands, and (2) to provide the villages with an understanding of the requirements, costs, and benefits of developing and operating wind or small hydroelectric power plants. The program was sponsored by the Tribal Energy program, Office of Energy Efficiency and Renewable Energy, US Department of Energy. The Contractor was Sealaska Corporation, the Regional Native Corporation for Southeast Alaska that includes 12 village/urban corporations. Most villages are isolated from any central electric transmission and use diesel-electric systems for power generation, making them prime candidates for deploying renewable energy sources. Wind Energy - A database was assembled for all of the candidate sites in SE Alaska, including location, demographics, electricity supply and demand, existing and planned transmission interties with central generation, topographical maps, macro wind data, and contact personnel. Field trips were conducted at the five candidate villages that were deemed most likely to have viable wind resources. Meetings were held with local village and utility leaders and the requirements, costs, and benefits of having local renewable energy facilities were discussed. Two sites were selected for anemometry based on their needs and the probability of having viable wind resources – Yakutat and Hoonah. Anemometry was installed at both sites and at least one year of wind resource data was collected from the sites. This data was compared to long-term data from the closest weather stations. Reports were prepared by meteorologist John Wade that contains the details of the measured wind resources and energy production projections. Preliminary financial analysis of hypothetical wind power stations were prepared to gauge the economic viability of installing such facilities at each site. The average wind resources measured at Yakutat at three sites were very marginal, with an annual average of 4.0 mps (9 mph) at 60 meters above ground level. At Hoonah, the average wind resources measured on the 1,417 ft elevation ridge above the village were very low, with a six-month average of 3.9 mps (8.7 mph) at 60 meters above ground level. The wind resources at both sites were not sufficient to justify installation of wind turbines. In summary, although there are several known windy spots in SE Alaska (e.g., Skagway), we were not able to identify any isolated Native American villages that utilize diesel-electric power generation that have commercially viable wind resources. Small Hydroelectric - The study focused on the communities associated with Sealaska Corporation that use diesel-electric for electricity and have a potential for hydroelectric power generation. Most of them have had at least an assessment of hydroelectric potential, and a few have had feasibility studies of potential hydroelectric projects. Although none of the sites examined are financially viable without substantial grant funding, Hoonah, Kake, and Yakutat appear to have the best potential for new hydro facilities.

Robert Lynette; John Wade: Larry Coupe

2006-06-30T23:59:59.000Z

166

Pueblo of Jemez Geothermal Feasibility Study Fianl Report  

DOE Green Energy (OSTI)

This project assessed the feasibility of developing geothermal energy on the Pueblo of Jemez, with particular attention to the Red Rocks area. Geologic mapping of the Red Rocks area was done at a scale of 1:6000 and geophysical surveys identified a potential drilling target at a depth of 420 feet. The most feasible business identified to use geothermal energy on the reservation was a greenhouse growing culinary and medicinal herbs. Space heating and a spa were identified as two other likely uses of geothermal energy at Jemez Pueblo. Further geophysical surveys are needed to identify the depth to the Madera Limestone, the most likely host for a major geothermal reservoir.

S.A. Kelley; N. Rogers; S. Sandberg; J. Witcher; J. Whittier

2005-03-31T23:59:59.000Z

167

Decentralized-coordinated model predictive control for a hydro-power valley  

Science Conference Proceedings (OSTI)

This paper aims at improving control systems for hydro-power production, by combining model predictive control techniques with decomposition-coordination methods for a global optimization over a whole hydro-power valley. It first recalls the model predictive ... Keywords: Case-study validation, Control optimization, Decomposition-coordination, Hydroelectricity, Model predictive control

J. ZáRate FlóRez, J. Martinez, G. BesançOn, D. Faille

2013-05-01T23:59:59.000Z

168

Feasibility assessment: Lake Frances power generation facilities for the city of Siloam Springs, Arkansas  

DOE Green Energy (OSTI)

The feasibility of developing the power potential of the Illinois River at the Lake Frances Dam for utilization by the city of Siloam Springs, Arkansas, was studied. It was found that the average annual power production potential of this site is 3.8 MWh; the cost saving produced by the proposed hydropower project will not support any remedial rehabilitation costs of the entire dam structure; development and operation of this hydropower project would save nonrenewal types of energy; if the capital cost can be fixed at present day prices, the development will become economically feasible when electric costs increase by 43%; and there will be no significant adverse environmental impact resulting from either the construction or operation of the hydropower facilities. It was concluded that the hydropower facilities should be constructed, owned and operated by the city of Siloam Springs, provided the dam safety can be assured and sources of funding can be made available so that the annual costs will not exceed the annual savings. (LCL)

None

1979-04-01T23:59:59.000Z

169

Case study: Feasibility analysis of renewable energy supply systems in a small grid connected resort.  

E-Print Network (OSTI)

??This paper presents a case study on the feasibility of a small grid connected resort in the marine west coast climate of Canada to implement… (more)

Robins, Jody

2009-01-01T23:59:59.000Z

170

Feasibility study on modeling and prediction of production behavior in naturally fractured shale reservoirs.  

E-Print Network (OSTI)

??The Objective of this study is to demonstrate the feasibility of predicting production characteristics in a Devonian Shale reservoir. This paper discusses the use of… (more)

Huls, Boyd T.

2004-01-01T23:59:59.000Z

171

Sei Vojany Station repowering reconstruction-assessment feasibility study. Volume 1. Export trade information  

SciTech Connect

The feasibility study conducted for Slovensky Energeticky Podnik (Slovak Energy Production Company) (SEP) evaluates reconstruction, repowering, and expansion of SEP's Vojany Station (EVO). Previous evaluations, studies, station records, and technical data were reviewed and utilized as a part of the feasibility analysis. The study results recommend a time-phased implementation for the recommended solutions.

Not Available

1992-01-01T23:59:59.000Z

172

Effects of Flaming Gorge Dam hydropower operations on downstream flow, stage, and sediment transport  

DOE Green Energy (OSTI)

Hydropower operations at Flaming Gorge Dam, located on the Green River in Utah, can produce rapid downstream changes in flow and stage. These changes can in turn affect sediment transport and ecologic resources below the dam. To evaluate these effects, four hydropower operational scenarios with varying degrees of hydropower-release fluctuations were examined. This study demonstrates that the combined use of river-flow routing, water-surface profile, and sediment-transport models can provide useful information for evaluating the potential impacts of hydropower-operations on ecological and other resources downstream of the dam. Study results show that flow fluctuations may or may not persist for a long distance, depending on the initial magnitude of fluctuation and the duration of hydropower peaking. Stage fluctuations depend not only on flow fluctuations but also on river channel characteristics, such as channel width and longitudinal slope.

Yin, S.C.L.; Tomasko, D.; Cho, H.E.; Williams, G. [Argonne National Lab., IL (United States); McCoy, J.; Palmer, C. [USDOE Western Area Power Administration, Salt Lake City, UT (United States)

1996-11-01T23:59:59.000Z

173

Feasibility study of geothermal energy for heating greenhouses. Final report  

SciTech Connect

The technical feasibility of heating greenhouses with geothermal heat is established. Off-the-shelf equipment suitable for geothermal heating is readily available. A procedure is given to economically examine a geothermal site for its suitability. Generally, geothermal heating systems are capital intensive. Where the geothermal energy is free the geothermal system is very attractive and where the cost of geothermal heat is the same as other energy, Btu/$, geothermal heat is unattractive.

LaFrance, L.J.

1979-06-01T23:59:59.000Z

174

FEASIBILITY STUDY OF PRESSURE PULSING PIPELINE UNPLUGGING TECHNOLOGIES FOR HANFORD  

SciTech Connect

The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging.

Servin, M. A. [Washington River Protection Solutions, LLC, Richland, WA (United States); Garfield, J. S. [AEM Consulting, LLC (United States); Golcar, G. R. [AEM Consulting, LLC (United States)

2012-12-20T23:59:59.000Z

175

Federal Memorandum of Understanding for Hydropower/Resources | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower/Resources Memorandum of Understanding for Hydropower/Resources < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources MOU Related Resources Hydropower Resources Assessment at Existing Reclamation Facilities An Assessment of Energy Potential at Non-Powered Dams in the United States Assessment of Potential Capacity Increases at Existing Hydropower Plants Site Inventory and Hydropower Energy Assessment of Reclamation Owned Conduits Potential Hydroelectric Development at Existing Federal Facilities Advanced Conventional Hydropower Planning and Operation Analysis Tools The Integrated Basin-Scale Opportunity Assessment Initiative, FY

176

Economic feasibility of geothermal district heating: a case study  

DOE Green Energy (OSTI)

The application of a computerized methodology developed at Brookhaven National Laboratory (BNL) to an assessment of the economic feasibility of district heating in Reno, Nevada is described. To apply this methodology, assumptions concerning the characteristics of the heat load served, the price of competing fuels, and alternate forms of district heat utility ownership are combined with data describing the geothermal resource. Using these inputs along with engineering costs for geothermal field development and pipe installation, the methodology generates detailed engineering and economic descriptors of several proposed district heating systems. The impact of alternate construction expenditure schedules, retrofit costs, and system size on the unit cost of district heat is examined.

Reisman, A.; Peterson, E.

1981-12-01T23:59:59.000Z

177

US hydropower resource assessment for South Dakota  

SciTech Connect

A total of 33 sites have been identified and assessed for their hydropower potential. Information as to the potential megawatts of capacity for 4 of the sites was not available; however, these sites have been identified as having hydropower potential and are included in the group of 33. The Hydropower Evaluation Software results for site capacities range from 35 kilowatts to 234 megawatts. Most of the sites have potential capacities of under 1 megawatts. The unadjusted hydropower potential for South Dakota was identified as being 1,124 megawatts. The Hydropower Evaluation Software results lower this estimate 38% to 695 megawatts. The greatest reduction in undeveloped potential occurs at developed sites with current power production. These sites have a Hydropower Evaluation Software estimated capacity of 285 megawatts, a 50% reduction in capacity. The number of sites does not change, only the identified capacity is reassessed.

Francfort, J.E.

1993-12-01T23:59:59.000Z

178

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Click image to enlarge Picture: Top Hydroelectric Generating Countries Contact: Hydropower, Send E-mail Last Updated: Tuesday, December 05, 2006 Copyright 2013 Idaho...

179

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

How Hydropower Works The Hydrologic Cycle: Water constantly moves through a vast global cycle, in which it evaporates from lakes and oceans, forms clouds, precipitates as rain or...

180

Idaho National Laboratory - Hydropower Program - Annotated Bibliograph...  

NLE Websites -- All DOE Office Websites (Extended Search)

policy actions might be undertaken to address the needs discussed here. Contact: Hydropower, Send E-mail Last Updated: Monday, July 18, 2005 Copyright 2013 Idaho National...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

NTIS Ordering Info The following are reports of interest to the hydropower industry, arranged by topic and chronologically with newest publications first. The reports with NTIS...

182

2011 Grants for Advanced Hydropower Technologies | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Manufacturing Facilities Wind Manufacturing Facilities Testing America's Wind Turbines Testing America's Wind Turbines U.S. Hydropower Potential from Existing Non-powered Dams...

183

Idaho National Laboratory - Hydropower Program: Research and...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental problems associated with hydropower operations, such as providing safe fish passage and improved water quality, have received considerable attention in the past...

184

Idaho National Laboratory - Hydropower Program - Annotated Bibliograph...  

NLE Websites -- All DOE Office Websites (Extended Search)

mitigation and other issues that affect hydropower development Development of unconventional technologies, such as low-headlow-power generating equipment that can be...

185

Relicensing and Environmental Issues Affecting Hydropower  

Reports and Publications (EIA)

This article presents an overview of the hydropower industry and summarizes two recent events that have greatly influenced relicensing and environmental issues.

Ronald S. Hankey

1998-04-01T23:59:59.000Z

186

Hydropower Resource Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

potential from the EERE Wind and Water Power Technologies Office. Addthis Related Articles Hydropower Technology Basics Glossary of Energy-Related Terms Microhydropower Basics...

187

Hydropower, Wave and Tidal Technologies Available for ...  

Site Map; Printable Version; Share this resource. Send a link to Hydropower, Wave and Tidal Technologies Available for Licensing - Energy Innovation Portalto someone ...

188

Preliminary feasibility study of pulping catalyst production from lignin  

SciTech Connect

A preliminary evaluation of the economic feasibility of preparing anthraquinone, a pulping catalyst, from readily available lignin has been performed. The proposed process begins with a fractionation of lignin from a black liquor stream by means of a supercritical fluid or conventional solvent extraction to give a low molecular weight fraction conductive to further chemical treatment. This fraction is sequentially oxidized with H{sub 2}O{sub 2}, treated with a diene and dehydrogenated to give anthraquinone. The cost of the proposed process is most dependent on the overall yield of the chemical processing steps with a smaller contribution noted for lignin processing. The projections indicate that anthraquinone could be produced for as low as $1.00--$1.25/lb using this process. Details of the process, chemical reactions and calculations are included.

Power, A.J. (Power (Arthur J.) and Associates, Boulder, CO (USA)); Bozell, J.J.; Chum, H.L. (Solar Energy Research Inst., Golden, CO (USA))

1989-11-01T23:59:59.000Z

189

Sei Vojany Station repowering reconstruction assessment feasibility study. Volume 3. Export trade information  

Science Conference Proceedings (OSTI)

The feasibility study conducted for Slovensky Energeticky Podnik(Slovak Energy Production Company) (SEP) evaluates reconstruction, repowering, and expansion of SEP's Vojany Station(EVO). The study recommends a training program for government and plant officials.

Not Available

1992-01-01T23:59:59.000Z

190

Comprehensive Renewable Energy Feasibility Study for the Makah Indian Tribe  

DOE Green Energy (OSTI)

The purpose of this project was to determine the technical feasibility, economic viability, and potential impacts of installing and operating a wind power station and/or small hydroelectric generation plants on the Makah reservation. The long-term objective is to supply all or a portion of Tribe's electricity from local, renewable energy sources in order to reduce costs, provide local employment, and reduce power outages. An additional objective was for the Tribe to gain an understanding of the requirements, costs, and benefits of developing and operating such plants on the reservation. The Makah Indian Reservation, with a total land area of forty-seven square miles, is located on the northwestern tip of the Olympic Peninsula in Washington State. Four major watersheds drain the main Reservation areas and the average rainfall is over one hundred inches per year. The reservation's west side borders the Pacific Ocean, but mostly consists of rugged mountainous terrain between 500 and 1,900 feet in elevation. Approximately 1,200 tribal members live on the Reservation and there is an additional non-Indian residential population of about 300. Electric power is provided by the Clallam County PUD. The annual usage on the reservation is approximately 16,700 mWh. Project Work Wind Energy--Two anemometer suites of equipment were installed on the reservation and operated for a more than a year. An off-site reference station was identified and used to project long-term wind resource characteristics at the two stations. Transmission resources were identified and analyzed. A preliminary financial analysis of a hypothetical wind power station was prepared and used to gauge the economic viability of installation of a multi-megawatt wind power station. Small Hydroelectric--Two potential sites for micro/small-hydro were identified by analysis of previous water resource studies, topographical maps, and conversations with knowledgeable Makah personnel. Field trips were conducted to collect preliminary site data. A report was prepared by Alaska Power & Telephone (Larry Coupe) including preliminary layouts, capacities, potential environmental issues, and projected costs. Findings and Conclusions Wind Energy The average wind resources measured at both sites were marginal, with annual average wind speeds of 13.6-14.0 mph at a 65-meter hub height, and wind shears of 0.08-0.13. Using GE 1.5 MW wind turbines with a hub height of 65 meters, yields a net capacity factor of approximately 0.19. The cost-of-energy for a commercial project is estimated at approximately 9.6 cents per kWh using current costs for capital and equipment prices. Economic viability for a commercial wind power station would require a subsidy of 40-50% of the project capital cost, loans provided at approximately 2% rate of interest, or a combination of grants and loans at substantially below market rates. Recommendations: Because the cost-of-energy from wind power is decreasing, and because there may be small pockets of higher winds on the reservation, our recommendation is to: (1) Leave one of the two anemometer towers, preferably the 50-meter southern unit MCC, in place and continue to collect data from this site. This site would serve as an excellent reference anemometer for the Olympic Peninsula, and, (2) If funds permit, relocate the northern tower (MCB) to a promising small site closer to the transmission line with the hope of finding a more energetic site that is easier to develop. Small Hydroelectric There are a very limited number of sites on the reservation that have potential for economical hydroelectric development, even in conjunction with water supply development. Two sites emerged as the most promising and were evaluated: (1) One utilizing four creeks draining the north side of the Cape Flattery peninsula (Cape Creeks), and (2) One on the Waatch River to the south of Neah Bay. The Cape Creeks site would be a combination water supply and 512 kW power generation facility and would cost a approximately $11,100,000. Annual power generation would be approximately 1,300,0

RobertLynette; John Wade; Larry Coupe

2005-03-31T23:59:59.000Z

191

Basin View Geothermal Heating District, Klamath Falls, Oregon: conceptual design and economic-feasibility study report  

DOE Green Energy (OSTI)

The findings of a feasibility study performed for Basin View Heating District in Klamath Falls, Oregon are reported. The purpose of the study is to determine the physical, economic, and political feasibility of establishing a geothermal heating district to provide space heat to housing units in the Basin View Development of Klamath Falls. Of the several systems considered, all are physically feasible. The project is politically feasible if the owner compiles with governmental requirements. Economic feasibility is based on considerations of money value rates, tax rates and expected rates of return, which are dependent on government and money markets. For analysis a money value rate of 21% and an owner's marginal tax rate of 35% were adopted.

Not Available

1981-07-01T23:59:59.000Z

192

Definitional mission study: Two Ukraine power projects feasibility study. Export trade information  

SciTech Connect

The Ukrainian Minister of Energy and Electrification has requested US Trade and Development Program (TDP) funding to support the feasibility study of a 600 MW repowering project at the Pridnieprovsk steam power station plant personnel. The space available at the site will accomodate the repowering and pollution control equipment being evaluated for the facility. TDP should fund the request after taking into consideration the analysis and recommendations presented in the Desk Study.

Patriciu, F.S.; Oliker, I.

1992-02-27T23:59:59.000Z

193

Federal Memorandum of Understanding for Hydropower/Federal Inland  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Federal Memorandum of Understanding for Hydropower/Federal Inland Hydropower Working Group < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Inland Hydropower Working Group The Federal Inland Hydropower Working Group is made up of 15 federal entities involved in the regulation, management, or development of hydropower resources (including hydrokinetics) in rivers and streams of the

194

Federal Energy Management Program: Hydropower and Ocean Energy Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower and Hydropower and Ocean Energy Resources and Technologies to someone by E-mail Share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Facebook Tweet about Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Twitter Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Google Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Delicious Rank Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Digg Find More places to share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on AddThis.com... Energy-Efficient Products

195

Investments in Existing Hydropower Unlock More Clean Energy ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investments in Existing Hydropower Unlock More Clean Energy Investments in Existing Hydropower Unlock More Clean Energy August 14, 2013 - 2:21pm Addthis Tacoma Power's Cushman...

196

Small Hydropower Systems: Energy Efficiency and Renewable Energy Clearinghouse  

DOE Green Energy (OSTI)

This fact sheet introduces consumers to small hydropower systems, and includes information on how the systems work and how to assess a stream site for hydropower suitability.

Nachman-Hunt, N.

2001-07-05T23:59:59.000Z

197

Anfu Guanshan Hydropower Development Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Anfu Guanshan Hydropower Development Co Ltd Jump to: navigation, search Name Anfu Guanshan Hydropower Development Co.,Ltd Place Jiangxi Province, China Zip 343009 Sector Hydro...

198

Microsoft Word - FINAL 2010 Hydropower Conference Agenda 052610...  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2010 - Direct Funding - Federal Hydropower Appropriations - Federal Hydropower's Place in Climate Change Legislation 3:15 p.m. BREAK 3:30...

199

Microsoft Word - Hydropower Conference Agenda 2007 053007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2007 - Direct Funding - Federal Hydropower Appropriations - Federal Hydropower's Place in Climate Change Legislation 2:05 p.m. Southwestern...

200

Microsoft PowerPoint - Sadiki - SW Regional Hydropower Conference...  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Division Operation Division SOUTHWESTERN FEDERAL SOUTHWESTERN FEDERAL HYDROPOWER CONFERENCE HYDROPOWER CONFERENCE 12 June 2008 12 June 2008 USACE Cost Benchmarking...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft PowerPoint - MVD Hydrokinetics, SW Regional Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects on the Mississippi River Mississippi River Southwestern Federal Hydropower Conference 10 June 2010 Jeff Artman, P.E. MVD Hydropower Business Line Manager Line Manager...

202

Los Alamos County Completes Abiquiu Hydropower Project, Bringing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean...

203

User's Guide Virtual Hydropower Prospector Version 1.1  

Science Conference Proceedings (OSTI)

The Virtual Hydropower Prospector is a web-based geographic information system (GIS) application for displaying U.S. water energy resource sites on hydrologic region maps. The application assists the user in locating sites of interest and performing preliminary, development feasibility assessments. These assessments are facilitated by displaying contextual features in addition to the water energy resource sites such as hydrograpy, roads, power infrastructure, populated places, and land use and control. This guide provides instructions for operating the application to select what features are displayed and the extent of the map view. It also provides tools for selecting features of particular interest and displaying their attribute information.

Douglas G. Hall; Sera E. White; Julie A. Brizzee; Randy D. Lee

2005-11-01T23:59:59.000Z

204

Commonwealth Hydropower Program (Massachusetts) | Open Energy...  

Open Energy Info (EERE)

Category Renewable Energy Incentive Programs Amount Design & Construction: 50% of costs or 1.00 per incremental kWh per year Feasibility study: 80% of costs Equipment...

205

Renewable Energy Development on Fort Mojave Reservation Feasiblity Study  

SciTech Connect

The Ft. Mojave tribe, whose reservation is located along the Colorado River in the states of Arizona, California, and Nevada near the point where all three states meet, has a need for increased energy supplies. This need is a direct result of the aggressive and successful economic development projects undertaken by the tribe in the last decade. While it is possible to contract for additional energy supplies from fossil fuel sources it was the desire of the tribal power company, AHA MACAV Power Service (AMPS) to investigate the feasibility and desirability of producing power from renewable sources as an alternative to increased purchase of fossil fuel generated power and as a possible enterprise to export green power. Renewable energy generated on the reservation would serve to reduce the energy dependence of the tribal enterprises on off reservation sources of energy and if produced in excess of reservation needs, add a new enterprise to the current mix of economic activities on the reservation. Renewable energy development would also demonstrate the tribe’s support for improving environmental quality, sustainability, and energy independence both on the reservation and for the larger community.

Russell Gum, ERCC analytics LLC

2008-03-17T23:59:59.000Z

206

Higgins coal gasification/repowering study, feasibility study for alternate fuels. Vol. 1. Executive summary  

SciTech Connect

Florida Power has completed a study to determine the feasibility of repowering 138 MW gross of oil-fired steam-generating capacity at its A.W. Higgins power station (Pinellas Co., Fla.) by utilizing coal-gasification combined-cycle (CGCC) technology. The repowering would add approximately 320 MW of gross electrical generation to the Higgins station through the use of combustion turbines and heat recovery equipment. This study provided Florida Power with the technical, environmental, and economic information necessary to determine the viability of using CGCC at the Higgins station. The plant would use BGC/Lurgi slagging gasifiers and the Selexol acid-gas removal system. Although this new technology represents an acceptable level of risk for the proposed project to be considered technically feasible, the capital-cost estimates were much higher than expected. Florida Power plans to continue further economic evaluations of this CGCC repowering option.

Not Available

1981-12-01T23:59:59.000Z

207

Document Number 00029500 Focused Feasibilitv Studv 5.0 Focused Feasibility Study  

Office of Legacy Management (LM)

00029500 Focused Feasibilitv Studv 00029500 Focused Feasibilitv Studv 5.0 Focused Feasibility Study The purpose of a CERCLA feasibility study is to develop, screen, and analyze potential remedial options for managing risk at uncontrolled hazardous waste sites (EPA 1988) in a manner that "reflect[s] the scope and complexity of the remedial action under consideration and the site problems being addressed" (EPA 1990). The feasibility study presented in this section is a focused feasibility study (FFS) because it follows more than 10 yr of remedial investigation, source removal, and an interim remedial action and because the changed site conditions since the 1998 drafi FS (DOE 1998b) justify a streamlined process for developing and screening potential remedial components and forming the remedial alternatives to be analyzed in detail.

208

US hydropower resource assessment for New Jersey  

Science Conference Proceedings (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of New Jersey.

Connor, A.M.; Francfort, J.E.

1996-03-01T23:59:59.000Z

209

21st century advanced hydropower turbine system  

DOE Green Energy (OSTI)

While hydropower turbine manufacturers have incrementally improved turbine technology to increase efficiency, the basic design concepts haven`t changed for decades. These late 19th and early 20th century designs did not consider environmental effects, since little was known about environmental effects of hydropower at the time. The U.S. Department of Energy (DOE) and the hydropower industry recognize that hydropower plants have an effect on the environment and there is a great need to bring turbine designs into the 21st century. DOE has issued a request for proposals (RFP) that requested proposers to discard conventional thinking, search out innovative solutions, and to visualize innovative turbines designed from a new perspective. This perspective would look at the {open_quotes}turbine system{close_quotes} (intake to tailrace) which will balance environmental, technical, and economic considerations. This paper describes the DOE Advanced Hydropower Turbine System Program.

Brookshier, P.A.; Flynn, J.V.; Loose, R.R.

1995-11-01T23:59:59.000Z

210

U.S. Hydropower Resource Assessment - California  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the underdeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of California.

A. M. Conner; B. N. Rinehart; J. E. Francfort

1998-10-01T23:59:59.000Z

211

US hydropower resource assessment for Colorado  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the hydropower development potential in this country. Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE, menu-driven software application. HES allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Colorado.

Francfort, J.E.

1994-05-01T23:59:59.000Z

212

US hydropower resource assessment for Oklahoma  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose, The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Oklahoma.

Francfort, J.E.

1993-12-01T23:59:59.000Z

213

US Hydropower Resource Assessment for Massachusetts  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the Commonwealth of Massachusetts.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

214

US hydropower resource assessment for New Hampshire  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of New Hampshire.

Francfort, J.E.

1995-07-01T23:59:59.000Z

215

US hydropower resource assessment for Texas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Texas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

216

US hydropower resource assessment for Kansas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Kansas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

217

US hydropower resource assessment for Rhode Island  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Rhode Island.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

218

US hydropower resource assessment for Vermont  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Vermont.

Conner, A.M.; Francfort, J.E.

1996-02-01T23:59:59.000Z

219

US hydropower resource assessment for Wyoming  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Wyoming.

Francfort, J.E.

1993-12-01T23:59:59.000Z

220

US hydropower resource assessment for Montana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Montana.

Francfort, J.E.

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

US hydropower resource assessment for Indiana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Indiana.

Francfort, J.E.

1995-12-01T23:59:59.000Z

222

US hydropower resource assessment for Iowa  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Iowa.

Francfort, J.E.

1995-12-01T23:59:59.000Z

223

US hydropower resource assessment for Arkansas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Arkansas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

224

US hydropower resource assessment for North Dakota  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of North Dakota.

Francfort, J.E.

1993-12-01T23:59:59.000Z

225

US hydropower resource assessment for Louisiana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Louisiana.

Francfort, J.E.

1993-12-01T23:59:59.000Z

226

US hydropower resource assessment for Missouri  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Missouri.

Francfort, J.E.

1993-12-01T23:59:59.000Z

227

US hydropower resource assessment for Washington  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Washington.

Conner, A.M.; Francfort, J.E.

1997-07-01T23:59:59.000Z

228

U.S. Hydropower Resource Assessment - Georgia  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Georgia.

A. M. Conner; B. N. Rinehart; J. E. Francfort

1998-10-01T23:59:59.000Z

229

US hydropower resource assessment for Wisconsin  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Wisconsin.

Conner, A.M.; Francfort, J.E.

1996-05-01T23:59:59.000Z

230

US hydropower resource assessment for Utah  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Utah.

Francfort, J.E.

1993-12-01T23:59:59.000Z

231

Feasibility Study of Economics and Performance of Geothermal...  

NLE Websites -- All DOE Office Websites (Extended Search)

Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon A Study Prepared in Partnership with the Environmental...

232

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This case study documents the performance best practices experience of Ketchikan Public Utilities (KPU), an Alaskan utility that operates four hydroelectric plants 4.2 MW at Ketchikan, 5 MW at Beaver Falls, 2.1 MW at Silvis, and 22.6 MW at Swan Lake. KPU has increased the performance of its hydroplants through assessment of performance best practices and implementation of performance improvement projects, resulting in increased generation and profitability.

2008-12-22T23:59:59.000Z

233

Quantifying the Value of Hydropower in the Electric Grid: Modeling Results for Future Scenarios  

Science Conference Proceedings (OSTI)

Work reported in this Technical Report is part of a larger study that is made up of multiple components and intends to utilize and enhance tools that can value hydropower assets in a changing electric grid. The study’s main objective is to develop a methodology to facilitate improved valuation and resource planning for pumped storage and conventional hydropower projects in the future electric transmission grid.This report covers Modeling Results for Future Electricity Market ...

2012-12-31T23:59:59.000Z

234

Cancer Mortality Among Nuclear Utility Workers: A Feasibility Study  

Science Conference Proceedings (OSTI)

A study of actual radiation exposures and health outcomes among U.S.utility workers could become the foremost occupational radiation study because of the large number of exposed persons and the manrem dose commitment.Such a study would provide the best nonextrapolated, statistically sound estimates of risks associated with chronic occupational exposure to low-level ionizing radiation.

1992-04-01T23:59:59.000Z

235

Hydropower: Setting a Course for Our Energy Future  

DOE Green Energy (OSTI)

Hydropower is an annual publication that provides an overview of the Department of Energy's Hydropower Program. The mission of the program is to conduct research and development that will increase the technical, societal, and environmental benefits of hydropower and provide cost-competitive technologies that enable the development of new and incremental hydropower capacity.

Not Available

2004-07-01T23:59:59.000Z

236

Feasibility study for wind power at SAB Newlands.  

E-Print Network (OSTI)

??This paper describes a MEng thesis project for a MEng in Renewable Energy Systems program at the Centre for Renewable Energy Studies at the University… (more)

Brosius, Walter

2009-01-01T23:59:59.000Z

237

Geothermal: Sponsored by OSTI -- Feasibility study for a 10-MM...  

NLE Websites -- All DOE Office Websites (Extended Search)

study for a 10-MM-GPY fuel ethanol plant, Brady Hot Springs, Nevada. Volume 1. Process and plant design Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us |...

238

Trans-Caspian gas pipeline feasibility study. Volume 1  

Science Conference Proceedings (OSTI)

This study, conducted by Enron Engineering and Construction Company, was funded by the US Trade and Development Agency. The study provides detailed information concerning natural gas demand in Turkey and Southern Europe. The purpose of the study is to estimate the rate at which new gas can be absorbed in the Turkish market and be re-exported to the markets in Europe, as well as to forecast Turkish natural gas demand for the period up to 2020. The study also evaluates gas demand and pricing for the market in the 2002--2005 time frame. This is Volume 1 of a 3-volume report, and is divided into the following sections: (1) Task A: Gas Sales; (2) Task B: Initial Economic Screening; (3) Task D: Project Cost Analysis.

NONE

1999-03-01T23:59:59.000Z

239

Feasibility Study for Vitrification of Sodium-Bearing Waste  

Science Conference Proceedings (OSTI)

Treatment of sodium-bearing waste (SBW) at the Idaho Nuclear Technology and Engineering Center (INTEC) within the Idaho National Engineering and Environmental Laboratory is mandated under a Settlement Agreement between the Department of Energy and the State of Idaho. One of the requirements of the Settlement Agreement is the complete calcination (i.e., treatment) of all SBW by December 31, 2012. One of the proposed options for treatment of SBW is vitrification. This study will examine the viability of SBW vitrification. This study describes the process and facilities to treat the SBW, from beginning waste input from INTEC Tank Farm to the final waste forms. Schedules and cost estimates for construction and operation of a Vitrification Facility are included. The study includes a facility layout with drawings, process description and flow diagrams, and preliminary equipment requirements and layouts.

J. J. Quigley; B. D. Raivo; S. O. Bates; S. M. Berry; D. N. Nishioka; P. J. Bunnell

2000-09-01T23:59:59.000Z

240

Factors hindering the development of small-scale municipal hydropower: a case study of the Black River project in Springfield, Vermont  

DOE Green Energy (OSTI)

There are many good reasons to use New England's small-scale hydropower resources to generate electricity. But current production capacity in the three northern states is only 1300 MW, just 35% of the 3710 MW estimated to be available to the states. Though the benefits of properly designed projects seem substantial, many factors combine to hinder their development. The Black River project in Springfield, Vermont, exemplifies the problem. Even after the two has invested over five years and $1 million in its effort to develop 30 MW of capacity, it still has not received either federal or state approval to proceed with construction. The first 4 years of the Springfield experience are described and factors that have greatly increased the cost and planning time for the project are identified. The purpose is to identify changes that could facilitate efforts to develop small-scale hydropower at other acceptable sites. On the basis of this experience it is recommended that: after issuance of a FERC permit, a preliminary determination of the project's impacts should be made by FERC officials; if environmental impacts are solely local or limited, environmental analysis/determination should be placed in the hands of the state; short-form licensing should be used for all run-of-river hydro projects that utilize and do not significantly modify existing water impoundment areas and do not significantly alter downstream flow patterns; and a hydro ombudsman with power at the state level should be established to facilitate governmental inter-agency coordination and project-related information transfer: one-stop licensing. (LCL)

Peters, E.; Berger, G.; Amlin, J.; Meadows, D.

1979-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

INTEC High-Level Waste Studies Universal Solvent Extraction Feasibility Study  

SciTech Connect

This report summarizes a feasibility study that has been conducted on the Universal Solvent Extraction (UNEX) Process for treatment and disposal of 4.3 million liters of INEEL sodium-bearing waste located at the Idaho Nuclear Technology and Engineering Center. This feasibility study covers two scenarios of treatment. The first, the UNEX Process, partitions the Cs/Sr from the SBW and creates remote-handled LLW and contact-handled TRU waste forms. Phase one of this study, covered in the 30% review documents, dealt with defining the processes and defining the major unit operations. The second phase of the project, contained in the 60% review, expanded on the application of the UNEX processes and included facility requirements and definitions. Two facility options were investigated for the UNEX process, resulting in a 2 x 2 matrix of process/facility scenarios as follows: Option A, UNEX at Greenfield Facility, Option B, Modified UNEX at Greenfield Facility, Option C, UNEX at NWCF, th is document, covers life-cycle costs for all options presented along with results and conclusions determined from the study.

J. Banaee; C. M. Barnes; T. Battisti (ANL-W) [ANL-W; S. Herrmann (ANL-W) [ANL-W; S. J. Losinski; S. McBride (ANL-W) [ANL-W

2000-09-01T23:59:59.000Z

242

Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants  

DOE Green Energy (OSTI)

Cooperative Agreement DE-FC07-06ID14788 was executed between the U.S. Department of Energy, Electric Transportation Applications, and Idaho National Laboratory to investigate the economics of producing hydrogen by electrolysis using electricity generated by nuclear power. The work under this agreement is divided into the following four tasks: Task 1 – Produce Data and Analyses Task 2 – Economic Analysis of Large-Scale Alkaline Electrolysis Task 3 – Commercial-Scale Hydrogen Production Task 4 – Disseminate Data and Analyses. Reports exist on the prospect that utility companies may benefit from having the option to produce electricity or produce hydrogen, depending on market conditions for both. This study advances that discussion in the affirmative by providing data and suggesting further areas of study. While some reports have identified issues related to licensing hydrogen plants with nuclear plants, this study provides more specifics and could be a resource guide for further study and clarifications. At the same time, this report identifies other area of risks and uncertainties associated with hydrogen production on this scale. Suggestions for further study in some of these topics, including water availability, are included in the report. The goals and objectives of the original project description have been met. Lack of industry design for proton exchange membrane electrolysis hydrogen production facilities of this magnitude was a roadblock for a significant period. However, recent design breakthroughs have made costing this facility much more accurate. In fact, the new design information on proton exchange membrane electrolyzers scaled to the 1 kg of hydrogen per second electrolyzer reduced the model costs from $500 to $100 million. Task 1 was delayed when the original electrolyzer failed at the end of its economic life. However, additional valuable information was obtained when the new electrolyzer was installed. Products developed during this study include a process model and a N2H2 economic assessment model (both developed by the Idaho National Laboratory). Both models are described in this report. The N2H2 model closely tracked and provided similar results as the H2A model and was instrumental in assessing the effects of plant availability on price when operated in the shoulder mode for electrical pricing. Differences between the H2A and N2H2 model are included in this report.

Stephen Schey

2009-07-01T23:59:59.000Z

243

FEASIBILITY STUDY II OF A MUON BASED NEUTRINO SOURCE.  

SciTech Connect

The concept of using a muon storage ring to provide a well characterized beam of muon and electron neutrinos (a Neutrino Factory) has been under study for a number of years now at various laboratories throughout the world. The physics program of a Neutrino Factoryis focused on the relatively unexplored neutrino sector. In conjunction with a detector located a suitable distance from the neutrino source, the facility would make valuable contributions to the study of neutrino masses and lepton mixing. A Neutrino Factory is expected to improve the measurement accuracy of sin{sup 2}(2{theta}{sub 23}) and {Delta}m{sup 2}{sub 32} and provide measurements of sin{sup 2}(2{theta}{sub 13}) and the sign of {Delta}m{sup 2}{sub 32}. It may also be able to measure CP violation in the lepton sector.

GALLARDO,J.C.; OZAKI,S.; PALMER,R.B.; ZISMAN,M.

2001-06-30T23:59:59.000Z

244

Feasibility Study: Ductless Hydronic Distribution Systems with Fan Coil Delivery  

SciTech Connect

The primary objectives of this study are to estimate potential energy savings relative to conventional ducted air distribution, and to identify equipment requirements, costs, and barriers with a focus on ductless hydronic delivery systems that utilize water-to-air terminal units in each zone. Results indicate that annual heating and cooling energy use can be reduced by up to 27% assuming replacement of the conventional 13 SEER heat pump and coil with a similarly rated air-to-water heat pump.

Springer, D.; Dakin, B.; Backman, C.

2012-07-01T23:59:59.000Z

245

White phosphorus pits focused feasibility study final July 2007.  

SciTech Connect

The White Phosphorus Burning Pits (WPP) Area of Concern (AOC) is a site of about 5.5 acres (2.2 ha) located in the J-Field Study Area, in the Edgewood Area of Aberdeen Proving Ground (APG), Maryland (Figure 1.1). Considerable information about the WPP exists as a result of efforts to characterize the hazards associated with J-Field. Contamination in the J-Field Study Area was first detected during an environmental survey of the APG Edgewood Area conducted in 1977 and 1978 (Nemeth et al. 1983) by the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA; predecessor to the U.S. Army Environmental Center). As part of a subsequent USATHAMA environmental survey, 11 wells were installed and sampled at J-Field (three of them at the WPP) (Nemeth 1989). Contamination was also detected in 1983 during a munitions disposal survey conducted by Princeton Aqua Science (1984). The Princeton Aqua Science investigation involved installing and sampling nine wells (four at the WPP) and collecting and analyzing surficial and deep composite soil samples (including samples from the WPP area). In 1986, the U.S. Environmental Protection Agency (EPA) issued a Resource Conservation and Recovery Act (RCRA) Permit (MD3-21-002-1355) requiring a post-wide RCRA Facility Assessment (RFA) and a hydrogeologic assessment of J-Field. In 1987, the U.S. Geological Survey (USGS) began a two-phase hydrogeologic assessment in which data were collected to model groundwater flow at J-Field. Soil-gas investigations were conducted, several well clusters were installed (four at the WPP), a groundwater flow model was developed, and groundwater and surface water monitoring programs were established that continue today. The results of the USGS study were published by Hughes (1993).

Davis, B.; Martino, L.

2007-08-21T23:59:59.000Z

246

Rebuilding the Brookhaven high flux beam reactor: A feasibility study  

SciTech Connect

After nearly thirty years of operation, Brookhaven`s High Flux Beam Reactor (HFBR) is still one of the world`s premier steady-state neutron sources. A major center for condensed matter studies, it currently supports fifteen separate beamlines conducting research in fields as diverse as crystallography, solid-state, nuclear and surface physics, polymer physics and structural biology and will very likely be able to do so for perhaps another decade. But beyond that point the HFBR will be running on borrowed time. Unless appropriate remedial action is taken, progressive radiation-induced embrittlement problems will eventually shut it down. Recognizing the HFBR`s value as a national scientific resource, members of the Laboratory`s scientific and reactor operations staffs began earlier this year to consider what could be done both to extend its useful life and to assure that it continues to provide state-of-the-art research facilities for the scientific community. This report summarizes the findings of that study. It addresses two basic issues: (i) identification and replacement of lifetime-limiting components and (ii) modifications and additions that could expand and enhance the reactor`s research capabilities.

Brynda, W.J.; Passell, L.; Rorer, D.C.

1995-01-01T23:59:59.000Z

247

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Research and Development Engineering Research and Development 1997 Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation, 1997, Development of a More Fish-Tolerant Turbine Runner, Advanced Hydropower Turbine Project, ARL Report No. 13-97/M63F, DOE/ID-10571. Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation conducted a research program to develop a turbine runner which will minimize fish injury and mortality at hydroelectric projects. An existing pump impeller provided the starting point for developing the fish-tolerant turbine runner. The Hidrostal pump is a single-bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of this research project was to develop a new runner geometry which is effective in downstream fish passage and

248

Feasibility study of a hybrid erosion drilling concept  

DOE Green Energy (OSTI)

The results of a system analysis of the ERODRILL concept are presented. ERODRILL is an erosion drilling technique that uses a stream of propellant capsules carried in the drilling mud and ignited near the bottom of the drill hole to provide a fluid jet on the rock face. The concept evaluated in this study was a hybrid system using the erosion drill to cut a kerf for a conventional rotary drill to break to. A preliminary design was made and a hypergolic propellant, Hercules HES 6573, was chosen. The background and rationale for this program are presented. The system, from its initial conception to its current hybrid design, is described. The propellant selection process is presented. The hazard evaluation, reliability analysis, and the economic analysis are given. Conclusions and recommendations are included. (MHR)

Not Available

1977-06-01T23:59:59.000Z

249

New bern biomass to energy project Phase I: Feasibility study  

DOE Green Energy (OSTI)

Weyerhaeuser, together with Amoco and Carolina Power & Light, performed a detailed evaluation of biomass gasification and enzymatic processing of biomass to ethanol. This evaluation assesses the potential of these technologies for commercial application to determine which technology offers the best opportunity at this time to increase economic productivity of forest resources in an environmentally sustainable manner. The work performed included preparation of site-specific plant designs that integrate with the Weyerhaeuser New Bern, North Carolina pulp mill to meet overall plant energy requirements, cost estimates, resource and product market assessments, and technology evaluations. The Weyerhaeuser team was assisted by Stone & Webster Engineering Corporation and technology vendors in developing the necessary data, designs, and cost information used in this comparative study. Based on the information developed in this study and parallel evaluations performed by Weyerhaeuser and others, biomass gasification for use in power production appears to be technically and economically viable. Options exist at the New Bern mill which would allow commercial scale demonstration of the technology in a manner that would serve the practical energy requirements of the mill. A staged project development plan has been prepared for review. The plan would provide for a low-risk and cost demonstration of a biomass gasifier as an element of a boiler modification program and then allow for timely expansion of power production by the addition of a combined cycle cogeneration plant. Although ethanol technology is at an earlier stage of development, there appears to be a set of realizable site and market conditions which could provide for an economically attractive woody-biomass-based ethanol facility. The market price of ethanol and the cost of both feedstock and enzyme have a dramatic impact on the projected profitability of such a plant.

Parson, F.; Bain, R.

1995-10-01T23:59:59.000Z

250

Klamath County geo-heating district feasibility study  

DOE Green Energy (OSTI)

The results are presented of an agreement between the Klamath County Commissioners and Oregon Institute of Technology Geo-Heat Utilization Center for the conceptual design, cost analysis and plan for space heating a number of public buildings in Klamath Falls, Oregon with geothermal hot water. This project was principally aimed at supplying geothermal heat to ten city and county buildings by hot water extracted from the existing museum well. The supply system is also designed to include the post office and a new building to be built in the vicinity of the courthouse. The fluid would be piped from the museum well to three liquid-to-liquid heat exchangers and returned to the area of the producing well for reinjection into the same aquifer. The study also considered space heating of 98 additional buildings in the downtown business district equivalent to the ten public buildings and incorporating a snow removal grid on Main Street between Eleventh and Fourth Streets. The geothermal fluid would be supplied from wells in the vicinity of Old Fort Road (city police pistol range) and returned for reinjection. Based on the study, the Center has concluded that no major resource or engineering difficulties exist that would prevent the ten-building project from being completed successfully with a significant long-term savings in both scarce fossil fuels and total heating costs. A direct environmental benefit of the large-scale plan would be a significant reduction in air pollutants (16 tons per year) from the burning of natural gas. For a capital investment of approximately $548,900 the delivery system, conversion of building heating systems and waste disposal could be accomplished for the ten buildings with potential expansion to twelve.

Lienau, P.J.; Lund, J.W.; Culver, G.G.

1977-01-01T23:59:59.000Z

251

Uniform criteria for US Hydropower Resource Assessment. Hydropower evaluation software status report  

SciTech Connect

The Department of Energy is estimating the hydropower development potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The Hydropower Evaluation Software estimates the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a DBASE, menu-driven software application. Hydropower Evaluation Software allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This status report details Hydropower Evaluation Software`s development, its data requirements, and its application to the 12 states assessed to date. This report does not discuss or present the various user-friendly menus of the Hydropower Evaluation Software. One is referred to the User`s Manual for specifics. This report focuses on data derivation, summarization of the 12 states (Arkansas, Colorado, Kansas, Louisiana, Missouri, Montana, North Dakota, Oklahoma, South Dakota, Texas, Utah, and Wyoming) extracted into the software to date, and plans for future assessments.

Francfort, J.E.; Rinehart, B.N. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Moore, K.M. [Morgantown Energy Technology Center, WV (United States)

1993-06-01T23:59:59.000Z

252

Uniform criteria for U.S. hydropower resource assessment: Hydropower Evaluation Software status report -- 2  

SciTech Connect

The US Department of Energy is estimating the undeveloped hydropower potential in the US. The Hydropower Evaluation software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The Hydropower Evaluation Software estimates the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software application. Hydropower Evaluation Software allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This status report describes Hydropower Evaluation Software`s development, its data requirements, and its application to the 20 states assessed to date. This report does not discuss or present the various user-friendly menus of the Hydropower Evaluation Software. The reader is referred to the User`s Manual for specifics. This report focuses on data derivation, summarization of the 20 states (Arkansas, Missouri, Montana, New Hampshire, North Dakota, Oklahoma, Rhode Island, South Dakota, Texas, Utah, Vermont, and Wyoming) assessed to date, and plans for future assessments.

Conner, A.M.; Francfort, J.E.; Rinehart, B.N.

1996-02-01T23:59:59.000Z

253

Low Head/Low Power Hydropower Resource Assessment of the Pacific Northwest Hydrologic Region  

E-Print Network (OSTI)

An analytical assessment of the hydropower potential of the Pacific Northwest Hydrologic Region was performed using state-of-the-art digital elevation models and geographic information system tools. The principal focus of the study was the amount of low head (less than 30 ft)/low power (less than 1 MW) potential in the region and the fractions of this potential that corresponded to the operating envelopes of three classes of hydropower technologies: conventional turbines, unconventional systems, and microhydro (less than 100 kW) technologies. To obtain these estimates, the hydropower potential of all the stream segments in the region, which averaged 2 miles in length, were calculated. These calculations were performed using hydrography and hydraulic heads that were obtained from the U.S. Geological Survey’s Elevation Derivatives for National Applications dataset and stream flow predictions from a regression equation developed specifically for the region. Stream segments excluded from development and developed hydropower in the

Power Hydropower; Douglas G. Hall; Gregory R. Carroll; Shane J. Cherry; Y D. Lee; Garold L. Sommers

2002-01-01T23:59:59.000Z

254

A Feasibility Study of Fuel Cell Cogeneration in Industry  

E-Print Network (OSTI)

Up until now, most of the literature on fuel cell cogeneration describes cogeneration at commercial sites. In this study, a PC25C phosphoric acid fuel cell cogeneration system was designed for an industrial facility and an economic analysis was performed. The US DOE Industrial Assessment Center (IAC) database was examined to determine what industry considers a good investment for energy saving measures. Finally, the results of the cogeneration analysis and database investigation were used to project the conditions in which the PC25C might be accepted by industry. Analysis of IAC database revealed that energy conservation recommendations with simple paybacks as high as five years have a 40% implementation rate; however, using current prices the simple payback of the PC25C fuel cell exceeds the likely lifetime of the machine. One drawback of the PC25C for industrial cogeneration is that the temperature of heat delivered is not sufficient to produce steam, which severely limits its usefulness in many industrial settings. The cost effectiveness of the system is highly dependent on energy prices. A five year simple payback can be achieved if the cost of electricity is $0.10/kWh or greater, or if the cost of the fuel cell decreases from about $3,500/kW to $950/kW. On the other hand, increasing prices of natural gas make the PC25C less economically attractive.

Phelps, S. B.; Kissock, J. K.

1997-04-01T23:59:59.000Z

255

Preliminary Advanced Test Reactor LEU Fuel Conversion Feasibility Study  

SciTech Connect

The Advanced Test Reactor (ATR) is a high power density, high neutron flux research reactor operating in the United States. The ATR has large irradiation test volumes located in high flux areas. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth with a maximum unperturbed thermal neutron flux rating of 1.0 x 1015 n/cm2–s. As a result, the ATR is a representative candidate for assessing the necessary modifications and evaluating the subsequent operating effects associated with low-enriched uranium (LEU) fuel conversion. A detailed plate-by-plate MCNP ATR 1/8th core model was developed for the fuel cycle burnup comparison analysis. Using the current HEU 235U enrichment of 93.0 % as a baseline, an analysis can be performed to determine the LEU uranium density and 235U enrichment required in the fuel meat to yield an equivalent Keff between the HEU core and a LEU core versus effective full power days (EFPD). The MCNP ATR 1/8th core model will be used to optimize the 235U loading in the LEU core, such that the differences in Keff between the HEU and LEU core can be minimized for operation at 150 EFPD with a total core power of 115 MW. The Monte-Carlo with ORIGEN-2 (MCWO) method was used to calculate Keff versus EFPDs. The MCWO-calculated results for the LEU case demonstrated adequate excess reactivity such that the LEU core conversion designer should be able to optimize the 235U content of each fuel plate, so that the Keff and relative radial fission heat flux profile are similar to the reference ATR HEU case. However, to demonstrate that the LEU core fuel cycle performance can meet the Upgraded Final Safety Analysis Report (UFSAR) safety requirements, a further study will be required in order to investigate the detailed radial, axial, and azimuthal heat flux profile variations versus EFPDs.

G. S. Chang; R. G. Ambrosek

2005-11-01T23:59:59.000Z

256

Feasibility study of new technology for intake air filtration  

SciTech Connect

This report comprises the results of a project sponsored by the Pipeline Research Committee of the American Gas Association (A.G.A). The work was composed of three major efforts: A literature search was performed to establish the state of the art of particle removal from gases, particularly electrostatic precipitation, and to identify the leading vendors of the equipment--considering both experience and technical expertise. Two chosen companies were visited to determine their technical capabilities as they apply to gas turbine inlet air filtration. A representative gas turbine was specified by the A.G.A. as being the equivalent of a GE Model 3002J turbine, with an airflow of 91,200 acfm. A specification based upon that airflow was prepared and submitted to the two vendors. Each vendor prepared a proposal for a filter system compliant with the specification. The proposed air filtration equipment is sufficiently different from existing products that it was judged not beneficial to visit manufacturing facilities. Both vendors are reputable suppliers of air filtration equipment. Compressors fouling is caused by the ingestion of substances which deposit and adhere to blade surfaces, resulting in reduced aerodynamic efficiency and decreased available output. Air contamination could be significantly reduced by the use of more efficient air filtration systems, especially through the reduction of the quantity of smaller particles ingested. The consequent lower loss of output power and decreased cleaning efforts provide lower costs of operation and increased shaft power. This study is intended to provide information relative to the use of new technology for air inlet filtration on gas turbines in gas pipeline pumping applications. 61 figs., 11 tabs.

Lawson, C.C.

1989-06-15T23:59:59.000Z

257

Brainpower for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

258

Brainpower for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

259

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose or Benefit of U.S. Dams National Inventory of Dams Statistic Contact: Hydropower, Send E-mail Last Updated: Monday, July 18, 2005 Copyright 2013 Idaho National...

260

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

Rinehart, U.S. Hydropower Resource Assessment Final Report (182 KB PDF), DOEID-10430.2, U.S. Department of Energy, December 1998. To provide a more accurate assessment of the...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Energy Basics: Large-Scale Hydropower  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

These plants are more than 30 MW in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a...

262

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

is part of the Advanced Hydropower Turbine Project sponsored by the U.S. Department of Energy (DOE). The conceptual design phase of the program defined a new hydro-turbine...

263

Grid Services from Hydropower and Pumped Storage  

Science Conference Proceedings (OSTI)

This Technical Update provides a summary of progress for the first year of a two-year collaborative research project to determine the value of hydropower to the electric transmission grid. This project utilizes, enhances, and expands tools to apply and value hydropower assets in the changing electric grid. The project employs several industry analyses and modeling tools at the unit level, the plant level, the system level, and the regional/national level, for quantifying and maximizing the benefits provi...

2010-12-31T23:59:59.000Z

264

Hydropower Resource Assessment of Brazilian Streams  

DOE Green Energy (OSTI)

The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information system (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.

Douglas G. Hall

2011-09-01T23:59:59.000Z

265

Commonwealth Hydropower Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grant Program Rebate Amount Design & Construction: 50% of costs or 1.00 per incremental kWh per year Feasibility study: 80% of costs Note: This program reopened March 15, 2013....

266

Economic feasibility of solar-thermal industrial applications and selected case studies  

DOE Green Energy (OSTI)

The economic feasibility is assessed of utilizing solar energy to augment an existing fossil fuel system to generate industrial process heat. Several case studies in the textile and food processing industries in the southern United States were analyzed. Sensitivity analyses were performed, and comparisons illustrating the effects of the Economic Recovery Tax Act of 1981 were made. The economic desirability of the proposed solar systems varied with the type of system selected, location of the facility, state tax credits, and type of fuel displaced. For those systems presently not economical, the projected time to economic feasibility was ascertained.

Montelione, A.; Boyd, D.; Branz, M.

1981-12-01T23:59:59.000Z

267

Geothermal Direct Use Feasibility Study on the Fort Bidwell Indian Reservation  

Science Conference Proceedings (OSTI)

The Fort Bidwell Indian Reservation (FBIR) is rich in renewable energy resources. Development of its geothermal resources has the potential to profoundly affect the energy and economic future of the FBIC. Geothermal energy can contribute to making the reservation energy self-sufficient and, potentially, an energy exporter. The feasibility study assessed the feasibility of installing a geothermal district heating system to provide low-cost, efficient heating of existing and planned residences, community buildings and water, using an existing geothermal well, FB-3.

Dale Merrick

2007-04-20T23:59:59.000Z

268

PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS  

DOE Green Energy (OSTI)

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-07-01T23:59:59.000Z

269

Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study  

SciTech Connect

In accordance with the requirements of the Remedial Investigation/Feasibility Study (RI/FS) Project Quality Assurance Plan, this Waste Management Plan establishes clear lines of responsibility and authority, documentation requirements, and operational guidance for the collection, identification, segregation, classification, packaging, certification, and storage/disposal of wastes. These subjects are discussed in the subsequent sections of this document.

1988-04-01T23:59:59.000Z

270

SPONSORED PROJECTS 1. Pending: "Feasibility Studies and Training to Support Landfill Gas Recovery in Ghana"  

E-Print Network (OSTI)

SPONSORED PROJECTS 1. Pending: "Feasibility Studies and Training to Support Landfill Gas Recovery: PI. 4. "An Improved Model to Predict Gas Generation from Landfills based on Waste Composition-2015, Role: Co-PI. 3. "Field Measurement of Emissions from Natural Gas Drilling, Production, and Distribution

Texas at Arlington, University of

271

Feasibility study of free-space quantum key distribution in the mid-infrared  

Science Conference Proceedings (OSTI)

We report on a feasibility study of a free-space Quantum Key Distribution setup operatingat a mid-infrared wavelength. Alice sends polarization-coded pseudo-single photonsfrom a Quantum Cascade Laser at 4.6 µm to Bob, who uses a nonlinear crystal ... Keywords: free-space optics, frequency up-conversion, mid-infrared, quantum key distribution

Guilherme Temporao; Hugo Zibinden; Sebastien Tanzilli; Nicolas Gisin; Thierry Aellen; Marcella Giovannini; Jerome Faist; Jean von der Weid

2008-01-01T23:59:59.000Z

272

Summary of some feasibility studies for site-specific solar industrial process heat  

DOE Green Energy (OSTI)

Some feasibility studies for several different site specific solar industrial process heat applications are summarized. The followng applications are examined. Leather Tanning; Concrete Production: Lumber and Paper Processing; Milk Processing; Molding, Curing or Drying; Automobile Manufacture; and Food Processing and Preparation. For each application, site and process data, system design, and performance and cost estimates are summarized.

Not Available

273

Cle Elum Lake Anadromous Salmon Restoration Feasibility Study: Summary of Research, 1986-1999 Progress Report.  

DOE Green Energy (OSTI)

The focus of this research was to study the feasibility for anadromous salmonids to recolonize the habitat above reservoirs in the Yakima River without disruption to irrigation withdrawals. A primary concern was whether anadromous fish could successfully exit reservoirs and survive downstream passage through the Yakima and Columbia Rivers to the ocean.

Dey, Douglas

2000-04-01T23:59:59.000Z

274

Economic and Financial Feasibility of Wind Energy -Case Study of Philippines  

E-Print Network (OSTI)

Economic and Financial Feasibility of Wind Energy - Case Study of Philippines Jyoti Prasad Painuly), can help project make viable in this case. 1 Introduction Wind energy has been one of the most., indicating viability of wind energy for entrepreneurs in developing countries as well. There are varying

275

Application of Statistical Quality Control Techniques to Detonator Fabrication: Feasibility Study  

SciTech Connect

A feasibility study was performed on the use of process control techniques which might reduce the need for a duplicate inspection by production inspection and quality control inspection. Two active detonator fabrication programs were selected for the study. Inspection areas accounting for the greatest percentage of total inspection costs were selected by applying "Pareto's Principle of Maldistribution." Data from these areas were then gathered and analyzed by a process capabiltiy study.

Jones, J. Frank

1971-05-20T23:59:59.000Z

276

Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices  

Energy.gov (U.S. Department of Energy (DOE))

This document is the appendices to the Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings document.

277

ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar  

SciTech Connect

ToÃ?Â?Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the CaÃ?Â?oncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

Burpo, Rob

2012-02-29T23:59:59.000Z

278

A stochastic feasibility study of Texas ethanol production: analysis of Texas Legislature ethanol subsidy proposal  

E-Print Network (OSTI)

The recent resurgence of interest in ethanol production has prompted the Texas State Legislature to investigate the feasibility of ethanol production in Texas. The reasons for the increased interest in ethanol production could possibly relate to depressed commodity prices, gasoline price volatility, environmental regulations and a renewed push towards increased fuel sufficiently given national and world events following September 11, 2001. Past feasibility studies have failed to incorporate the risk of input and output prices in their analyses. Furthermore, it is evident from the literature, that unrealistic values were used in many of the studies, to perhaps, entice prospective investors in providing capital for the construction and operation of the ethanol facilities. This study provides an unbiased, stochastic simulation feasibility study incorporating the risks of ethanol, corn, dry distillers grains (DDGS), soybean meal, electricity, and natural gas prices on three size facilities in Texas. In addition, four different scenarios were included incorporating four levels of the proposed Texas State Producer Grant into the feasibility study. Those levels were the $0.00, $0.10, $0.20, and $0.30/gal on the first 30 million gallons per year (MMGPY) of production for each registered plant. Rather than assuming point values for input variables and providing a deterministic analysis, the advantage of this study is that it provides a feasibility study that includes risks of input and output prices in its results. For each of the three size facilities analyzed (15, 30, and 80 MMGPY) the results of probability of negative cash flows and simple statistics, probability of dividend payments and simple statistics, present value of ending owners equity in 2022, net present value, certainty equivalents and absolute certainty equivalents risk premiums of net present value are described in the study. The study found that neither the 15, 30, or the 80 MMGPY facilities would be feasible in Texas. The facilities have little chance of economic success under the best scenario ($0.30/gal) and all have a zero percent chance of maintaining beginning equity.

Gill, Robert Chope

2002-01-01T23:59:59.000Z

279

Solar feasibility study for site-specific industrial-process-heat applications. Final report  

DOE Green Energy (OSTI)

This study addresses the technical feasibility of solar energy in industrial process heat (IPH) applications in Mid-America. The study was one of two contracted efforts covering the MASEC 12-state region comprised of: Illinois, Michigan, North Dakota, Indiana, Minnesota, Ohio, Iowa, Missouri, South Dakota, Kansas, Nebraska, Wisconsin. The results of our study are encouraging to the potential future role of solar energy in supplying process heat to a varied range of industries and applications. We identified and developed Case Study documentation of twenty feasible solar IPH applications covering eight major SIC groups within the Mid-American region. The geographical distribution of these applications for the existing range of solar insolation levels are shown and the characteristics of the applications are summarized. The results of the study include process identification, analysis of process heat requirements, selection of preliminary solar system characteristics, and estimation of system performance and cost. These are included in each of the 20 Case Studies. The body of the report is divided into two primary discussion sections dealing with the Study Methodology employed in the effort and the Follow-On Potential of the identified applications with regard to possible demonstration projects. The 20 applications are rated with respect to their relative overall viability and procedures are discussed for possible demonstration project embarkment. Also, a possible extension of this present feasibility study for late-comer industrial firms expressing interest appears worthy of consideration.

Murray, O.L.

1980-03-18T23:59:59.000Z

280

Modern Control System Design for Hydro-power Plant.  

E-Print Network (OSTI)

??This thesis addresses dynamic model and advance controller design for entire Hydro-power plant. Although hydro-power has the best payback ratio and the highest efficiency in… (more)

Ding, Xibei

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Hydropower and Ocean Energy Resources and Technologies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies October 7, 2013 - 9:29am Addthis Photo of water flowing from several openings in a hydropower dam. Hydropower produces 10% of the nation's energy, including power from the Ice Harbor Dam in Burbank, Washington. This page provides a brief overview of hydropower and ocean energy resources and technologies supplemented by specific information to apply these technologies within the Federal sector. Overview Hydropower has been used for centuries to power machinery, but the application most commonly associated with hydropower is electricity production through dams. Ocean energy refers to various forms of renewable energy harnessed from the ocean. There are two primary types of ocean energy: mechanical and thermal.

282

Economics of Cherepnov water lifter for low-head hydropower  

Science Conference Proceedings (OSTI)

The economic feasibility of using the Cherepnov lifter to augment the water head in small-scale hydroelectric power generation was investigated, and is reported. The economics of the cherepnov lifter for use as a pump to supply water looks very promising both for large and small systems. However, the economics of using the lifter in hydroelectric power generation is not promising, especially for large and high-head systems. This, however, does not preclude the economics or the desirability of using the lifter for microhydro low-head systems, especially if low-cost tanks are available and PVC pipes can be used. A desirable feature of the lifter separate from economical considerations is the ability of the lifter to pass fish unharmed. This feature should be taken advantage of when the lifter is used for hydropower generation.

Liu, H.; Geekie, R.

1983-01-01T23:59:59.000Z

283

Feasibility study: utilization of landfill gas for a vehicle fuel system, Rossman's landfill, Clackamas County, Oregon  

SciTech Connect

In 1978, a landfill operator in Oregon became interested in the technical and economic feasibility of recovering the methane generated in the landfill for the refueling of vehicles. DOE awarded a grant for a site-specific feasibility study of this concept. This study investigated the expected methane yield and the development of a conceptual gas-gathering system; gas processing, compressing, and storage systems; and methane-fueled vehicle systems. Cost estimates were made for each area of study. The results of the study are presented. Reasoning that gasoline prices will continue to rise and that approximately 18,000 vehicles in the US have been converted to operate on methane, a project is proposed to use this landfill as a demonstration site to produce and process methane and to fuel a fleet (50 to 400) vehicles with the gas produced in order to obtain performance and economic data on the systems used from gas collection through vehicle operation. (LCL)

Not Available

1981-01-01T23:59:59.000Z

284

Hydropower: Setting a Course for Our Energy Future. Wind and...  

NLE Websites -- All DOE Office Websites (Extended Search)

aim to identify potential sites and partners . . . . . . . . . . . . . . . . . . . . 17 Wind & Hydropower Technologies Program - Harnessing America's abundant natural resources...

285

Huaneng Lancang River Hydropower | Open Energy Information  

Open Energy Info (EERE)

Lancang River Hydropower Lancang River Hydropower Jump to: navigation, search Name Huaneng Lancang River Hydropower Place Kunming, Yunnan Province, China Zip 650214 Sector Hydro, Solar Product Developer of hydro and solar power projects. Coordinates 25.051001°, 102.702011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.051001,"lon":102.702011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

286

Boosting America's Hydropower Output | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boosting America's Hydropower Output Boosting America's Hydropower Output Boosting America's Hydropower Output October 9, 2012 - 2:10pm Addthis The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado.

287

NETL: News Release - NETL and USAF Release Feasibility Study for Conceptual  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2007 9, 2007 NETL and USAF Release Feasibility Study for Conceptual Coal+Biomass-to-Liquids Facility Facility Would Capitalize on Domestic Energy Resources, Cut Greenhouse Gas Emissions MORGANTOWN, WV - The U.S. Department of Energy's National Energy Technology Laboratory (DOE/NETL) and the U.S. Air Force have released a study that examines the feasibility of producing l00,000 barrels per day of jet fuel from coal and biomass. The coal+biomass-to-liquids (CBTL) facilities could also cut life-cycle emissions of carbon dioxide (CO2), the primary greenhouse gas, by 20 percent compared to conventional petroleum processes. The study provides a performance baseline that can be used to show how CBTL with carbon capture and storage would capitalize on domestic energy resources, provide a buffer against rising petroleum and natural gas prices, and mitigate output of CO2.

288

A feasibility study for a one-megawatt pulsed spallation source at Los Alamos National Laboratory  

SciTech Connect

Over the past two decades, high-intensity proton accelerators have been designed and developed to support nuclear physics research and defense applications. This technology has now matured to the point where it can support simultaneous and cost-effective exploitation of a number of important areas of both basic and applied science. Examples include neutron scattering, the production of radioisotopes, tests of technologies to transmute nuclear waste, radiation damage studies, nuclear physics, and muon spin research. As part of a larger program involving these and other areas, a team at Los Alamos National Laboratory has undertaken a feasibility study for a 1-MW pulsed spallation neutron source (PSS) based on the use of an 800-MeV proton linac and an accumulator ring. In January 1994, the feasibility study was reviewed by a large, international group of experts in the design of accelerators and neutron spallation targets. This group confirmed the viability of the proposed neutron source. In this paper, I describe the approach Los Alamos has taken to the feasibility study, which has involved a synergistic application of the Laboratory`s expertise in nuclear science and technology, computation, and particle-beam technologies. Several examples of problems resolved by the study are described, including chopping of low-energy proton beam, interactions between H{sup {minus}} particles and the stripper foil used to produce protons for injection into an accumulator ring, and the inclusion of engineering realities into the design of a neutron production target. These examples are chosen to illustrate the breadth of the expertise that has been brought to bear on the feasibility study and to demonstrate that there are real R&D issues that need to be resolved before a next-generation spoliation source can be built.

Pynn, R.

1994-07-01T23:59:59.000Z

289

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

290

A neutronic feasibility study for LEU conversion of the Brookhaven Medical Research Reactor (BMRR).  

SciTech Connect

A neutronic feasibility study for converting the Brookhaven Medical Research Reactor from HEU to LEU fuel was performed at Argonne National Laboratory in cooperation with Brookhaven National Laboratory. Two possible LEU cores were identified that would provide nearly the same neutron flux and spectrum as the present HEU core at irradiation facilities that are used for Boron Neutron Capture Therapy and for animal research. One core has 17 and the other has 18 LEU MTR-type fuel assemblies with uranium densities of 2.5g U/cm{sup 3} or less in the fuel meat. This LEU fuel is fully-qualified for routine use. Thermal hydraulics and safety analyses need to be performed to complete the feasibility study.

Hanan, N. A.

1998-01-14T23:59:59.000Z

291

Feasibility study for thermal treatment of solid tire wastes in Bangladesh by using pyrolysis technology  

Science Conference Proceedings (OSTI)

In this study on the basis of lab data and available resources in Bangladesh, feasibility study has been carried out for pyrolysis process converting solid tire wastes into pyrolysis oils, solid char and gases. The process considered for detailed analysis was fixed-bed fire-tube heating pyrolysis reactor system. The comparative techno-economic assessment was carried out in US$ for three different sizes plants: medium commercial scale (144 tons/day), small commercial scale (36 tons/day), pilot scale (3.6 tons/day). The assessment showed that medium commercial scale plant was economically feasible, with the lowest unit production cost than small commercial and pilot scale plants for the production of crude pyrolysis oil that could be used as boiler fuel oil and for the production of upgraded liquid-products.

Islam, M.R., E-mail: mrislam1985@yahoo.com [Department of Mechanical Engineering, Rajshahi University of Engineering and Technology, Rajshahi 6204 (Bangladesh); Joardder, M.U.H.; Hasan, S.M. [Department of Mechanical Engineering, Rajshahi University of Engineering and Technology, Rajshahi 6204 (Bangladesh); Takai, K.; Haniu, H. [Department of Mechanical Engineering, National University Corporation Kitami Institute of Technology, 165 Koen-cho, Kitami City, Hokkaido 090-8507 (Japan)

2011-09-15T23:59:59.000Z

292

Dry Storage Demonstration for High-Burnup Spent Nuclear Fuel: Feasibility Study  

Science Conference Proceedings (OSTI)

Initially, casks for dry storage of spent fuel were licensed for assembly-average burnup of about 35 GWd/MTU. Over the last two decades, the discharge burnup of fuel has increased steadily and now routinely exceeds 45 GWd/MTU. This feasibility study examines the options available for conducting a confirmatory experimental program supporting regulatory acceptance of practical approaches for storing, and later transporting, spent fuel with burnup well in excess of 45 GWd/MTU under a dry, inert atmosphere.

2003-09-19T23:59:59.000Z

293

Feasibility study and roadmap to improve residential hot water distribution systems  

DOE Green Energy (OSTI)

Residential building practice currently ignores the losses of energy and water caused by the poor design of hot water systems. These losses include: the waste of water while waiting for hot water to get to the point of use; the wasted heat as water cools down in the distribution system after a draw; and the energy to reheat water that was already heated once before. A feasibility study and an action plan for a proposed research project involving residential hot water distribution systems is being developed. The feasibility study will use past work to estimate of hot water and energy loses caused by current hot water distribution systems in residences. Proposed research project, or roadmap, will develop recommendations for improvements to residential hot water distribution systems. The roadmap addresses the technical obstacles and gaps in our knowledge that prevent water and energy reductions and market adoption of water- and energy-efficient technologies. The initial results of the feasibility study are presented here along with a discussion of a roadmap to improve the efficiency of residential hot water distribution systems.

Lutz, James D.

2004-03-31T23:59:59.000Z

294

Geothermal resource, engineering and economic feasibility study for the City of Ouray, Colorado. Final report  

DOE Green Energy (OSTI)

A geothermal energy feasibility study has been performed for the City of Ouray, Colorado, to determine the potential economic development opportunities to the City. The resource assessment indicates the resource to be associated with the Ouray fault zone, the Leadville limestone formation, the high thermal gradient in the area of the San Juan mountains, and the recharge from precipitation in the adjacent mountains. Four engineering designs of alternative sizes, costs, applications, and years of start-up have been defined to offer the City a range of development scales. Life cycle cost analyses have been conducted for cases of both public and private ownership. All systems are found to be feasible on both economic and technical grounds. 49 refs., 8 figs.

Meyer, R.T.; Raskin, R.; Zocholl, J.R.

1982-07-31T23:59:59.000Z

295

A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation  

SciTech Connect

The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through the decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.

Terry Battiest

2012-11-30T23:59:59.000Z

296

Rehabilitating and Upgrading Hydropower Plants: A Hydropower Technology Round-Up Report, Volume 2  

Science Conference Proceedings (OSTI)

Owners of aging hydropower plants are confronted with an array of project and technology options for rehabilitating or upgrading their facilities and are making large capital investment decisions at a time of increasing competitive pressures. Ensuring that investments in plant are optimal requires a thorough understanding of the technologies, approaches and strategies available for rehab and upgrading -- as well as the risks associated with these projects. This volume of EPRI's Hydropower Technology Roun...

1999-10-28T23:59:59.000Z

297

Virtual Hydropower Prospector | Open Energy Information  

Open Energy Info (EERE)

Virtual Hydropower Prospector Virtual Hydropower Prospector Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Virtual Hydropower Prospector Agency/Company /Organization: Idaho National Laboratory Sector: Energy Topics: Resource assessment Resource Type: Software/modeling tools User Interface: Website Website: hydropower.inl.gov/prospector/index.shtml Country: United States Cost: Free Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

298

Idaho National Laboratory - Hydropower Program: Technology Transfer  

NLE Websites -- All DOE Office Websites (Extended Search)

Part 16 (9.6MB PDF) Part 17 ( 11MB PDF) Part 18 (6.9MB PDF) Part 19 (8.2MB PDF) Micro-Hydro Power Reviewing an old Concept, January 1979 (2.6MB PDF) Contact: Hydropower, Send...

299

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

Science Conference Proceedings (OSTI)

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

300

&#8220;Sustainable development of hydropower in third countries: The  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainable development of hydropower in third countries: Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight against glo

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Federal Memorandum of Understanding for Hydropower | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Memorandum of Understanding for Hydropower On March 24, 2010, the Department of the Army through the U.S. Army Corps of Engineers, the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to "help meet the nation's needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts." Additionally, the MOU aims to

302

U.S. hydropower resource assessment for Virginia  

DOE Green Energy (OSTI)

In June 1989, the US Department of Energy initiated the development of a National Energy Strategy to identify the energy resources available to support the expanding demand for energy in the US. Public hearings conducted as part of the strategy development process indicated that undeveloped hydropower resources were not well defined. As a result, the Department of Energy established an interagency Hydropower Resource Assessment Team to ascertain the undeveloped hydropower potential. In connection with these efforts by the Department of Energy, the Idaho National Engineering Laboratory designed the Hydropower Evaluation Software (HES), which has been used to perform a resource assessment of the undeveloped conventional hydropower potential in over 30 states. This report presents the results of the hydropower resource assessment for the State of Virginia. Undeveloped pumped storage hydropower potential is not included.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

303

$26.6 Million for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$26.6 Million for Hydropower $26.6 Million for Hydropower $26.6 Million for Hydropower April 5, 2011 - 4:52pm Addthis Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs Today, the Department of Energy and the Department of Interior announced $26.6 million of available funding for companies and entrepreneurs looking to advance hydropower. "By improving hydropower technology, we can maximize America's biggest source of renewable energy in an environmentally responsible way," said Secretary Chu. Specifically, funding is available for projects in the following four areas: Sustainable small hydropower Environmental mitigation technologies for conventional hydropower

304

Antu County 303 Hydropower Station Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Antu County 303 Hydropower Station Co Ltd Antu County 303 Hydropower Station Co Ltd Jump to: navigation, search Name Antu County 303 Hydropower Station Co., Ltd. Place Jilin Province, China Zip 133613 Sector Hydro Product China-based small hydro CDM project developer. References Antu County 303 Hydropower Station Co., Ltd.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Antu County 303 Hydropower Station Co., Ltd. is a company located in Jilin Province, China . References ↑ "Antu County 303 Hydropower Station Co., Ltd." Retrieved from "http://en.openei.org/w/index.php?title=Antu_County_303_Hydropower_Station_Co_Ltd&oldid=342210" Categories: Clean Energy Organizations Companies Organizations

305

DESIGN AND FEASIBILITY STUDY OF A PEBBLE BED REACTOR-STEAM POWER PLANT  

SciTech Connect

Originally issued as S and P 1963A, Parts I and II. A design and feasibility study of a pebble bed reactorsteam power plant is presented, The reactor design which evolved from this study is a 125 Mwe heliumcooled two-region thermal breeder, operating on the uranium-thorium cycle, in which all core structural materials are graphite. Fuel is in the form of unclad spherical elements of graphite, containing fissile and fertile material. The primary loop consists of the reactor plus three steam generators and blowers in parallel. Nuclear characteristics, costs, etc., are given. (W.D.M.)

1958-05-01T23:59:59.000Z

306

Feasibility study on the management of the disposal of Bangkok municipal waste. Final report  

SciTech Connect

In January, 1985, the Government of Thailand sought assistance from the United States Trade and Development Program (USTDP) to undertake a feasibility study to review and update the solid waste management master plan, with particular emphasis to be placed on waste disposal methods. In April, 1985, the USTDP engaged the firm of Engineering and Economic Research, Inc. to carry out a definitional/prefeasibility study to assess the potential of a project for solid waste management and energy production using municipal solid waste as fuel.

1989-09-01T23:59:59.000Z

307

Fluidized bed combustor 50 MW thermal power plant, Krabi, Thailand. Feasibility study. Export trade information  

SciTech Connect

The report presents the results of a study prepared by Burns and Roe for the Electricity Generating Authority of Thailand to examine the technical feasibility and economic attractiveness for building a 50 MW Atmospheric Fluidized Bed Combustion lignite fired power plant at Krabi, southern Thailand. The study is divided into seven main sections, plus an executive summary and appendices: (1) Introduction; (2) Atmospheric Fluidized Bed Combustion Technology Overview; (3) Fuel and Limestone Tests; (4) Site Evaluation; (5) Station Design and Arrangements; (6) Environmental Considerations; (7) Economic Analysis.

1993-01-01T23:59:59.000Z

308

Feasibility Study of Solar Photovoltaics on Landfills in Puerto Rico (Second Study)  

Science Conference Proceedings (OSTI)

This report presents the results of an assessment of the technical and economic feasibility of deploying a solar photovoltaics (PV) system on landfill sites in Puerto Rico. The purpose of this report is to assess the landfills with the highest potential for possible solar PV installation and estimate cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). The report outlines financing options that could assist in the implementation of a system. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system. The landfills and sites considered in this report were all determined feasible areas in which to implement solar PV systems.

Salasovich, J.; Mosey, G.

2011-08-01T23:59:59.000Z

309

Feasibility and Risk Study of a Geothermal Power Plant at the Salton Sea KGRA  

DOE Green Energy (OSTI)

This report contains the results of a feasibility and risk study performed by Bechtel National, Inc. and the Ben Holt Company under contract to the San Diego Gas and Electric Company (SDG&E). The purpose of the study was to define the most technically feasible and lowest cost near-term energy conversion process for a 50 MWe geothermal power plant at the Salton Sea known Geothermal Resource Area (KGRA). Using the latest information from the Geothermal This report contains the results of a feasibility and risk study performed by Bechtel National, Inc. and the Ben Holt Company under contract to the San Diego Gas and Electric Company (SDG&E). The purpose of the study was to define the most technically feasible and lowest cost near-term energy conversion process for a 50 MWe geothermal power plant at the Salton Sea known Geothermal Resource Area (KGRA). Using the latest information from the Geothermal Loop Experimental Facility (GLEF), which is currently in operation at the Salton Sea KGRA, conceptual designs, capital cost estimates, and busbar energy production cost estimates were developed for power plants employing several versions of flashed steam and flash binary energy conversion processes. A power plant and well field risk analysis was also performed. The results show that while the flashed steam plant has the advantage of lower plant capital cost, the brine flow rate required by the binary plant is lower. This results in busbar energy production costs for the two plants that are the same. However, the risk analysis indicates that the technical risks are less for the flashed steam further work at the GLEF. The version of the flashed steam process with lowest energy production cost was the dual-flash process with three 50 percent capacity trains of flash tanks with unmodified brine. Thus, it was determined that GLEF testing in the immediate future should be directed primarily toward this process. A series of GLEP tests and further studies were defined for the purpose of alleviating or minimizing the major risks associated with the flash steam process. The most important risks were found to be those associated with brine handling. They include producing the brine, carrying it through the plant, and injecting it into the subsurface formation. The report includes details of costs of a binary plant and a flash plant. [DJE-2005

None

1978-05-10T23:59:59.000Z

310

Feasibility study for the recycling of nickel metal hydride electric vehicle batteries. Final report  

DOE Green Energy (OSTI)

This feasibility study examined three possible recycling processes for two compositions (AB{sub 2} and AB{sub 5}) of nickel metal hydride electric vehicle batteries to determine possible rotes for recovering battery materials. Analysts examined the processes, estimated the costs for capital equipment and operation, and estimated the value of the reclaimed material. They examined the following three processes: (1) a chemical process that leached battery powders using hydrochloric acid, (2) a pyrometallurical process, and (3) a physical separation/chemical process. The economic analysis revealed that the physical separation/chemical process generated the most revenue.

Sabatini, J.C.; Field, E.L.; Wu, I.C.; Cox, M.R.; Barnett, B.M.; Coleman, J.T. [Little (Arthur D.), Inc., Cambridge, MA (United States)

1994-01-01T23:59:59.000Z

311

Detroit Lakes energy systems study: Phase I feasibility. Final report, February 1, 1978--July 31, 1978  

DOE Green Energy (OSTI)

The objective of the Detroit Lakes Energy Systems Study is to determine the economic feasibility of alternative renewable energy system configurations in the northern latitudes. A forecast through both 1990 and the year 2000 is made of the demand for electrical energy in the Detroit Lakes area. An assessment of renewable energy resources including biomass, wind, and insolation is provided. A detailed analysis is made of system costs including biomass, wind, solar thermal, solar photovoltaic, selected hybrids, and conventional fuel systems. Lessons learned and recommendations for prototype fabrication are highlighted. (MHR)

none,

1978-07-31T23:59:59.000Z

312

A New Process for Hot Metal Production at Low Fuel Rate - Phase 1 Feasibility Study  

Science Conference Proceedings (OSTI)

The project is part of the continuing effort by the North American steel industry to develop a coal-based, cokeless process for hot metal production. The objective of Phase 1 is to determine the feasibility of designing and constructing a pilot scale facility with the capacity of 42,000 mtpy of direct reduced iron (DRI) with 95% metallization. The primary effort is performed by Bricmont, Inc., an international engineering firm, under the supervision of McMaster University. The study focused on the Paired Straight Hearth furnace concept developed previously by McMaster University, The American Iron and Steel Institute and the US Department of Energy.

Dr. Wei-Kao Lu

2006-02-01T23:59:59.000Z

313

Feasibility study of measuring the temperature and pressure of warm dense matter.  

Science Conference Proceedings (OSTI)

We have investigated the feasibility of making accurate measurements of the temperature and pressure of solid-density samples rapidly heated by the Z-Petawatt laser to warm dense matter (WDM) conditions, with temperatures approaching 100eV. The study focused specifically on the heating caused by laser generated proton beams. Based on an extensive literature search and numerical investigations, a WDM experiment is proposed which will accurately measure temperature and pressure based on optical emission from the surface and sample expansion velocity.

Rambo, Patrick K.; Schwarz, Jens

2008-09-01T23:59:59.000Z

314

Feasibility investigation and design study of optical well logging methods for high temperature geothermal wells  

DOE Green Energy (OSTI)

The objective of this project was exploration of a novel approach to high temperature well logging, based on a system of optical transducers and an optical transmission line both theoretically capable of operation to at least 600/sup 0/C. The scope of the work involved the accomplishment of ten specific tasks. These had as their objective the determination of feasibility, and identification of major problem areas, in the implementation of continuous temperature logging of geothermal wells using optical techniques. The following tasks are reported: literature review and data compilation, measurement of fiber properties production fiber procurement, investigation of methods of fiber termination, cable design and fabrication, and sensor and system studies. (MHR)

Swanson, R.K.; Anderson, R.E.; Ash, J.I.; Beissner, R.E.; Smith, V.D.

1978-03-01T23:59:59.000Z

315

Feasibility study of tuned-resonator, pulsating cavitating water jet for deep-hole drilling  

DOE Green Energy (OSTI)

This study presents the advantages of pulsing a submerged jet to increase its erosion capability (particularly as caused by cavitation) in augmenting deep-hole drill bits. Various methods of accomplishing the pulsation are presented and discussed. The most attractive systems uncovered are acoustic oscillators which passively accomplish pulsations in the flow at frequencies corresponding to a Strouhal number in the range of 0.2 to 1.0. Such passive oscillators are assessed to be feasible candidates for development into practical deep hole drill bit systems and a long range plan for this research and development is presented and discussed.

Johnson, V.E. Jr.; Lindenmuth, W.T.; Conn, A.F.; Frederick, G.S.

1981-08-01T23:59:59.000Z

316

Report on the feasibility study for improving electric motor service centers in Ghana  

Science Conference Proceedings (OSTI)

On March 3 and 4, 1998, a visit was made to Oak Ridge National Laboratory (ORNL) by two officials from Ghana: Mr. I.K. Mintah, Acting Executive Director, Technical Wing, Ministry of Mines and Energy (MOME) and Dr. A.K. Ofosu-Ahenkorah, Coordinator, Energy Efficiency and Conservation Program, MOME. As a result of this visit, Dr. John S. Hsu of ORNL was invited by MOME to visit the Republic of Ghana in order to study the feasibility of improving electric motor service centers in Ghana.

Hsu, J.S.; Jallouk, P.A.; Staunton, R.H.

1999-12-10T23:59:59.000Z

317

Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

318

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

319

CA la electricidad de caracas: Arrecifes repowering project. Feasibility study report. Export trade information  

Science Conference Proceedings (OSTI)

The study, conducted by Raytheon Engineers & Constructors, was funded by the U.S. Trade and Development agency on behalf of C.A. La Electricidad de Caracas. The report shows the results of a feasibility study conducted to evaluate the repowering of the Arrecifes Power Plant. The study focuses on capital cost for the project, refurbishment of existing equipment, and the installation of new repowering equipment. The study also evaluates combustion turbine generators of different manufacturers and sizes to determine the most beneficial configuration. The report is divided into the following sections: (1) Introduction; (2) Conclusions and Recommendations; (3) Study Basis; (4) Alternatives Analysis; (5) Layout and Equipment Issues; (6) Performance and Economic Analysis; (7) Repowered Facility Description; (8) Mechanical Systems; (9) Civil/Structural/Architectural; (10) Electrical Systems; (11) Instrumentation and Controls; (12) Environmental Overview; (13) Project Implementation Plan; (14) Project Conceptual Cost Estimate.

NONE

1993-10-01T23:59:59.000Z

320

A neutronic feasibility study for LEU conversion of the high flux beam reactor (HFBR).  

SciTech Connect

A neutronic feasibility study for converting the High Flux Beam Reactor at Brookhaven National Laboratory from HEU to LEU fuel was performed at Argonne National Laboratory. The purpose of this study is to determine what LEU fuel density would be needed to provide fuel lifetime and neutron flux performance similar to the current HEU fuel. The results indicate that it is not possible to convert the HFBR to LEU fuel with the current reactor core configuration. To use LEU fuel, either the core needs to be reconfigured to increase the neutron thermalization or a new LEU reactor design needs to be considered. This paper presents results of reactor calculations for a reference 28-assembly HEU-fuel core configuration and for an alternative 18-assembly LEU-fuel core configuration with increased neutron thermalization. Neutronic studies show that similar in-core and ex-core neutron fluxes, and fuel cycle length can be achieved using high-density LEU fuel with about 6.1 gU/cm{sup 3} in an altered reactor core configuration. However, hydraulic and safety analyses of the altered HFBR core configuration needs to be performed in order to establish the feasibility of this concept.

Pond, R. B.

1998-01-16T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Remedidal investigation and feasibility study report for the Environmental Restoration Disposal Facility  

Science Conference Proceedings (OSTI)

The purpose of the remedial investigation (RI) is to collect data necessary to adequately characterize the site for the purpose of developing and evaluating effective remedial alternatives. To characterize the site, the lead agency shall, as appropriate, conduct field investigations, including treatability studies, and conduct a baseline risk assessment. The RI provides information to assess the risks to human health and the environment and to support the development, evaluation, and selection of appropriate response alternatives. The primary objective of the feasibility study (FS) is to ensure that appropriate remedial alternatives are developed and evaluated such that relevant information concerning the remedial action options can be presented to a decision-maker and an appropriate remedy selected. The lead agency may develop a feasibility study to address a specific site problem or the entire site. The development and evaluation of alternatives shall reflect the scope and complexity of the remedial action under consideration and the site problems being addressed. Development of alternatives shall be fully integrated with the site characterization activities of the remedial investigation described in paragraph (d) of this section. The lead agency shall include an alternatives screening step, when needed, to select a reasonable number of alternatives for detailed analysis.

Roeck, F.V.

1994-06-01T23:59:59.000Z

322

Hydropower resources at risk: The status of hydropower regulation and development - 1997  

DOE Green Energy (OSTI)

This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to prepare this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).

Hunt, R.T.; Hunt, J.A. [Richard Hunt Associates, Inc., Annapolis, MD (United States)

1997-09-01T23:59:59.000Z

323

Feasibility Study for Bioethanol Co-Location with a Coal Fired Power Plant: 29 November 2001--28 July 2002  

Science Conference Proceedings (OSTI)

This study looks at the feasibility of co-locating 30, 50, and 70 million gallon per year bioethanol facilities with coal fired power plants in Indiana and Nebraska. Corn stover is the feedstock for ethanol production in both cases.

Not Available

2002-12-01T23:59:59.000Z

324

Final Progress Report: Isotope Identification Algorithm for Rapid and Accurate Determination of Radioisotopes Feasibility Study  

SciTech Connect

This is the final report of the project titled, 'Isotope Identification Algorithm for Rapid and Accurate Determination of Radioisotopes,' PMIS project number LA10-HUMANID-PD03. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). It summarizes work performed over the FY10 time period. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). Human analysts begin analyzing a spectrum based on features in the spectrum - lines and shapes that are present in a given spectrum. The proposed work was to carry out a feasibility study that will pick out all gamma ray peaks and other features such as Compton edges, bremsstrahlung, presence/absence of shielding and presence of neutrons and escape peaks. Ultimately success of this feasibility study will allow us to collectively explain identified features and form a realistic scenario that produced a given spectrum in the future. We wanted to develop and demonstrate machine learning algorithms that will qualitatively enhance the automated identification capabilities of portable radiological sensors that are currently being used in the field.

Rawool-Sullivan, Mohini [Los Alamos National Laboratory; Bounds, John Alan [Los Alamos National Laboratory; Brumby, Steven P. [Los Alamos National Laboratory; Prasad, Lakshman [Los Alamos National Laboratory; Sullivan, John P. [Los Alamos National Laboratory

2012-04-30T23:59:59.000Z

325

Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance  

SciTech Connect

This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interim Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.

Not Available

1993-12-01T23:59:59.000Z

326

Feasibility study on the verification of fresh fuel assemblies in shipping containers  

SciTech Connect

The purpose of this study was to examine the feasibility of using various nondestructive measurement techniques to determine the presence of fuel assemblies inside shipping containers and to examine the feasibility of measuring the fissile content of the containers. Passive and active techniques based on both gamma and neutron assay were examined. In addition, some experiments and calculations were performed to evaluate neutron techniques. Passive counting of the 186 keV gamma from {sup 235}U is recommended for use as an attributes measurement technique. Experiments and studies indicated that a bismuth germanate (BGO) scintillator is the preferred detector. A properly designed system based on this detector will provide a compact detector that can selectively verify fuel assemblies within a shipping container while the container is in a stack of similarly loaded containers. Missing fuel assemblies will be readily detected, but gamma counting of assemblies cannot detect changes in the fissile content of the inner rods in an assembly. If a variables technique is required, it is recommended that more extensive calculations be performed and removal of the outer shipping container be considered. Marking (sealing) of the assemblies with a uniquely identifiable transponder was also considered. This would require the development of procedures that would assure proper application and removal of the seal. When change to a metal outer container occurs, the technique will no longer be useful unless a radiolucent window is included in the container. 20 refs., 7 figs., 2 tabs.

Swinth, K.L.; Tanner, J.E.

1990-09-01T23:59:59.000Z

327

FEASIBILITY STUDY FOR A PETROLEUM REFINERY FOR THE JICARILLA APACHE TRIBE  

Science Conference Proceedings (OSTI)

A feasibility study for a proposed petroleum refinery for the Jicarilla Apache Indian Reservation was performed. The available crude oil production was identified and characterized. There is 6,000 barrels per day of crude oil production available for processing in the proposed refinery. The proposed refinery will utilize a lower temperature, smaller crude fractionation unit. It will have a Naphtha Hydrodesulfurizer and Reformer to produce high octane gasoline. The surplus hydrogen from the reformer will be used in a specialized hydrocracker to convert the heavier crude oil fractions to ultra low sulfur gasoline and diesel fuel products. The proposed refinery will produce gasoline, jet fuel, diesel fuel, and a minimal amount of lube oil. The refinery will require about $86,700,000 to construct. It will have net annual pre-tax profit of about $17,000,000. The estimated return on investment is 20%. The feasibility is positive subject to confirmation of long term crude supply. The study also identified procedures for evaluating processing options as a means for American Indian Tribes and Native American Corporations to maximize the value of their crude oil production.

John D. Jones

2004-10-01T23:59:59.000Z

328

Final Report of Native Village of Venetie Tribal Government Solar Feasibility Study  

DOE Green Energy (OSTI)

The villages of Venetie and Arctic, located above the Arctic Circle in northeast Alaska along the Chandalar River and just southeast of the Brooks Range, will study the feasibility of powering the villages using renewable solar energy during the season of the midnight sun. The solar electric (photovoltaic) system will replace diesel generator power for most of the summertime, yielding great economic, environmental, and social benefits. The Native Village of Venetie Tribal Government conducted a feasibility study for powering of an entire village during the season of the midnight sun, using renewable solar energy. The goal was for the renewable system to allow the diesel generators to be turned completely off for most of the summertime, yielding great economic, environmental, and social benefits. The system would operate year round. While there would be no solar energy input during the long night of December and January, during the months that the sun does not shine, the system's energy storage component would continue to provide benefits by saving fuel, due to more steady generator operation and by providing back-up power during generator outages.

Lance Whitwell

2007-03-01T23:59:59.000Z

329

Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Feasibility Studies to Improve Plant Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants Background Gasification provides the means to turn coal and other carbonaceous solid, liquid and gaseous feedstocks as diverse as refinery residues, biomass, and black liquor into synthesis gas and valuable byproducts that can be used to produce low-emissions power, clean-burning fuels and a wide range of commercial products to support

330

Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos County Completes Abiquiu Hydropower Project, Bringing Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on the completion and startup today of the Abiquiu Hydropower Project in New Mexico - the first hydropower project funded by the American Recovery and Reinvestment Act to be completed nationwide. "Today marks a major milestone in securing America's clean energy future as we celebrate the completion of the Department of Energy's first major Recovery Act-funded water power project. By increasing renewable energy output at existing hydropower facilities, we can create clean energy jobs,

331

Large-Scale Hydropower Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

332

Large-Scale Hydropower Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

333

A neutronic feasibility study for LEU conversion of the high flux isotope reactor (HFIR).  

SciTech Connect

A neutronic feasibility study was performed to determine the uranium densities that would be required to convert the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) from HEU (93%) to LEU (<20%)fuel. The LEU core that was studied is the same as the current HEU core, except for potential changes in the design of the fuel plates. The study concludes that conversion of HFIR from HEU to LEU fuel would require an advanced fuel with a uranium density of 6-7 gU/cm{sup 3} in the inner fuel element and 9-10 gU/cm{sup 3} in the outer fuel element to match the cycle length of the HEU core. LEU fuel with uranium density up to 4.8 gU/cm{sup 3} is currently qualified for research reactor use. Modifications in fuel grading and burnable poison distribution are needed to produce an acceptable power distribution.

Mo, S. C.

1998-01-14T23:59:59.000Z

334

Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents a standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.

Salasovich, J.; Mosey, G.

2012-01-01T23:59:59.000Z

335

Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit  

SciTech Connect

This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

NONE

1995-03-01T23:59:59.000Z

336

Feasibility study of tank leakage mitigation using subsurface barriers. Revision 1  

SciTech Connect

This document reflects the evaluations and analyses performed in response to Tri-Party Agreement Milestone M-45-07A - {open_quotes}Complete Evaluation of Subsurface Barrier Feasibility{close_quotes} (September 1994). In addition, this feasibility study was revised reflecting ongoing work supporting a pending decision by the DOE Richland Operations Office, the Washington State Department of Ecology, and the US Environmental Protection Agency regarding further development of subsurface barrier options for SSTs and whether to proceed with demonstration plans at the Hanford Site (Tri-Party Agreement Milestone M-45-07B). Analyses of 14 integrated SST tank farm remediation alternatives were conducted in response to the three stated objectives of Tri-Party Agreement Milestone M-45-07A. The alternatives include eight with subsurface barriers and six without. Technologies used in the alternatives include three types of tank waste retrieval, seven types of subsurface barriers, a method of stabilizing the void space of emptied tanks, two types of in situ soil flushing, one type of surface barrier, and a clean-closure method. A no-action alternative and a surface-barrier-only alternative were included as nonviable alternatives for comparison. All other alternatives were designed to result in closure of SST tank farms as landfills or in clean-closure. Revision 1 incorporates additional analyses of worker safety, large leak scenarios, and sensitivity to the leach rates of risk controlling constituents. The additional analyses were conducted to support TPA Milestone M-45-07B.

Treat, R.L.; Peters, B.B.; Cameron, R.J. [Enserch Environmental, Inc., Richland, WA (United States)] [and others

1995-01-01T23:59:59.000Z

337

File:Federal Hydropower - Southeastern Power Administration.pdf...  

Open Energy Info (EERE)

Login | Sign Up Search File Edit History Facebook icon Twitter icon File:Federal Hydropower - Southeastern Power Administration.pdf Jump to: navigation, search File File...

338

NREL: Energy Analysis - Hydropower Results - Life Cycle Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Report on Renewable Energy Sources and Climate Change Mitigation: Hydropower OpenEI: Data, Visualization, and Bibliographies Chart that shows life cycle greenhouse gas...

339

The Next Generation of Hydropower Engineers and Scientists |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation...

340

Investments in Existing Hydropower Unlock More Clean Energy ...  

NLE Websites -- All DOE Office Websites (Extended Search)

to upgrade the nation's existing hydropower facilities -- helping to increase our supply of clean, renewable energy and provide more communities with affordable, reliable...

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Hydropower, Wave and Tidal Technologies - Energy Innovation Portal  

Biomass and Biofuels Hydropower, Wave and Tidal Industrial ... raw materials suggests the need for elimination of these materials from electric motors ...

342

Microsoft PowerPoint - Hydropower conf SDOX June 2008 final ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Osborn, Chief Technology Officer Clay Thompson, Senior Engineer Southwestern Federal Hydropower Conference June 12, 2008 BlueInGreen, LLC 535 W. Research Blvd. Fayetteville, AR...

343

Alaska coal gasification feasibility studies - Healy coal-to-liquids plant  

SciTech Connect

The Alaska Coal Gasification Feasibility Study entailed a two-phase analysis of the prospects for greater use of Alaska's abundant coal resources in industrial applications. Phase 1, Beluga Coal Gasification Feasibility Study (Report DOE/NETL 2006/1248) assessed the feasibility of using gasification technology to convert the Agrium fertilizer plant in Nikiski, Alaska, from natural gas to coal feedstock. The Phase 1 analysis evaluated coals from the Beluga field near Anchorage and from the Usibelli Coal Mine near Healy, both of which are low in sulfur and high in moisture. This study expands the results of Phase 1 by evaluating a similar sized gasification facility at the Usibelli Coal mine to supply Fischer-Tropsch (F-T) liquids to central Alaska. The plant considered in this study is small (14,640 barrels per day, bbl/d) compared to the recommended commercial size of 50,000 bbl/d for coal-to-liquid plants. The coal supply requirements for the Phase 1 analysis, four million tons per year, were assumed for the Phase 2 analysis to match the probable capacity of the Usibelli mining operations. Alaska refineries are of sufficient size to use all of the product, eliminating the need for F-T exports out of the state. The plant could produce marketable by-products such as sulfur as well as electric power. Slag would be used as backfill at the mine site and CO{sub 2} could be vented, captured or used for enhanced coalbed methane recovery. The unexpected curtailment of oil production from Prudhoe Bay in August 2006 highlighted the dependency of Alaskan refineries (with the exception of the Tesoro facility in Nikiski) on Alaska North Slope (ANS) crude. If the flow of oil from the North Slope declines, these refineries may not be able to meet the in-state needs for diesel, gasoline, and jet fuel. Additional reliable sources of essential fuel products would be beneficial. 36 refs., 14 figs., 29 tabs., 3 apps.

Lawrence Van Bibber; Charles Thomas; Robert Chaney [Research & Development Solutions, LLC (United States)

2007-07-15T23:59:59.000Z

344

Hydroelectric feasibility study: Chubb River Sites, Village of Lake Placid, New York  

DOE Green Energy (OSTI)

This study was performed to determine if the re-installation and re-activation of hydroelectric generating facilities at the Mill Pond and Power Pond dams in the Village of Lake Placid, N.Y. would be technically, environmentally, and economically feasible. The study includes a description and evaluation of the conditions of the existing facilities, an estimate of the potential generation at the two sites, a review of regulatory requirements, an economic analysis, and an implementation schedule for installing the facilities. The results show that the installation of new generating equipment within the existing powerhouse may be economically advantageous. Installation of generating facilities at the Mill Pond site would be uneconomical due to low head, aesthetic, environmental costraints, and therefore, is not recommended. The benefits which would be realized by installing equipment at the powerhouse are long term and station operation would initially have to be subsidized for a number of years. (LCL)

Not Available

1979-01-01T23:59:59.000Z

345

Agua Caliente Solar Feasibility and Pre-Development Study Final Report  

Science Conference Proceedings (OSTI)

Evaluation of facility- and commercial-scale solar energy projects on the Agua Caliente Band of Cahuilla Indians Reservation in Palm Springs, CA. The Agua Caliente Band of Cahuilla Indians (ACBCI) conducted a feasibility and pre-development study of potential solar projects on its lands in southern California. As described below, this study as a logical and necessary next step for ACBCI. Support for solar project development in California, provided through the statewide California Solar Initiative (CSI), its Renewable Portfolio Standard and Feed-in Tariff Program, and recently announced Reverse Auction Mechanism, provide unprecedented support and incentives that can be utilized by customers of California's investor-owned utilities. Department of Energy (DOE) Tribal Energy Program funding allowed ACBCI to complete its next logical step to implement its Strategic Energy Plan, consistent with its energy and sustainability goals.

Carolyn T. Stewart, Managing Partner; Red Mountain Energy Partners

2011-04-26T23:59:59.000Z

346

Feasibility study of underground energy storage using high-pressure, high-temperature water. Final report  

DOE Green Energy (OSTI)

A technical, operational and economic feasibility study on the storage of energy as heated high pressure water in underground cavities that utilize the rock overburden for containment is presented. Handling peak load requirements of electric utility power networks is examined in some detail. The cavity is charged by heating water with surplus steaming capacity during periods of low power requirement. Later this hot water supplies steam to peaking turbines when high load demands must be met. This system can be applied to either new or existing power plants of nuclear or fossil fuel type. The round trip efficiency (into storage and back) is higher than any other system - over 90%. Capital costs are competitive and the environmental impact is quite benign. Detailed installation and design problems are studied and costs are estimated. The continental United States is examined for the most applicable geology. Formations favorable for these large cavities exist in widespread areas.

Dooley, J.L.; Frost, G.P.; Gore, L.A.; Hammond, R.P.; Rawson, D.L.; Ridgway, S.L.

1977-01-01T23:59:59.000Z

347

Renewable Energy Feasibility Study Leading to Development of the Native Spirit Solar Energy Facility  

DOE Green Energy (OSTI)

DOE-funded renewable energy feasibility study conducted by Red Mountain Tribal Energy on behalf of the Southwest Tribal Energy Consortium (SWTEC). During the course of the study, SWTEC members considered multiple options for the organization structure, selected a proposed organization structure, and drafted a Memorandum of Understanding for the SWTEC organization. High-level resource assessments for SWTEC members were completed; surveys were developed and completed to determine each member’s interest in multiple participation options, including on-reservation projects. With the survey inputs in mind, multiple energy project options were identified and evaluated on a high-level basis. That process led to a narrowing of the field of technology options to solar generation, specifically, utility-scale Concentrating Solar-Powered Generation projects, with a specific, tentative project location identified at the Fort Mojave Indian Reservation -- the Native Spirit Solar Energy Facility.

Carolyn Stewart; Tracey LeBeau

2008-01-31T23:59:59.000Z

348

Mosenergo Ryazan Repowering Project (GRES-24). Feasibility study. Export trade information  

Science Conference Proceedings (OSTI)

This study, conducted by GE Power Systems Engineering, was funded by the U.S. Trade and Development Agency. The objective of this study was to determine the technical and economic feasibility and demonstrate the financial attractiveness of repowering Mosenergo`s power plant. The report covers the overall efficiency and cycle output of the repowered cycle, as well unit costs for fuel pricing and electricity. The report is divided into the following sections: Executive Summary (I) Summary of Technical, Economic and Financing Analyses Tab 1; Overview (II) Detail Analyses/Reports Tab 2; General Electric Power Systems Tab 3; Teploelectroproject (TEP) Tab 4; Machine-Building Factory of Podoslk Tab 5; Russian Project Finance Bank Tab 6; Gilbert Commonwealth. (III) Drawings (in Russian Version only).

NONE

1996-02-20T23:59:59.000Z

349

Woodruff Narrows low head hydroelectric power plant feasibility determination  

DOE Green Energy (OSTI)

Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

Not Available

1979-03-01T23:59:59.000Z

350

Microsoft Word - Feasibility_Study_Regulation_Reserves_fmr_mark final 2.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

90E 90E Using Dimmable Lighting for Regulation Capacity and Non-Spinning Reserves in the Ancillary Services Market A Feasibility Study F. Rubinstein, L. Xiaolei, D.S. Watson Environmental Energy Technologies Division December 2010 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

351

Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill  

NLE Websites -- All DOE Office Websites (Extended Search)

Johnson Johnson County Landfill James Salasovich and Gail Mosey Technical Report NREL/TP-6A20-53186 January 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill James Salasovich and Gail Mosey Prepared under Task No. IGST.1100 Technical Report NREL/TP-6A20-53186 January 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

352

Incorporating ecological risk assessment into remedial investigation/feasibility study work plans  

SciTech Connect

This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

Not Available

1994-06-01T23:59:59.000Z

353

A neutronic feasibility study for LEU conversion of the Budapest research reactor.  

SciTech Connect

A neutronic feasibility study for conversion of the Budapest Research Reactor (BRR) from HEU to LEU fuel was performed at Argonne National Laboratory in cooperation with the KFKI Atomic Energy Research Institute in Hungary. Comparisons were made of the reactor performance with the current HEU (36%) fuel and with a proposed LEU (19.75%) fuel. Cycle lengths, thermal neutron fluxes, and rod worths were calculated in equilibrium-type cores for each type of fuel. Relative to the HEU fuel, the LEU fuel has up to a 50% longer fuel cycle length, but a 7-10% smaller thermal neutron flux in the experiment locations. The rod worths are smaller with the LEU fuel, but are still large enough to easily satisfy the BRR shutdown margin criteria. Irradiation testing of four VVR-M2 LEU fuel assemblies that are nearly the same as the proposed BRR LEU fuel assemblies is currently in progress at the Petersburg Nuclear Physics Institute.

Pond, R. B.

1998-10-16T23:59:59.000Z

354

Preliminary feasibility study of heating and cooling alternatives for Nebraska Western College, Scottsbluff, Nebraska  

SciTech Connect

The existence of a recently-recognized, low-temperature, geothermal resource under central and western Nebraska represents a potential alternate energy source. The feasibility of using that resource for space heating and cooling at Nebraska Western College, Scottsbluff, Nebraska, as an alternative to that facility's current, natural-gas fired, heating and cooling system is explored. This study addresses: (1) the geological (hydrological) aspects of such a project; (2) the retrofitting requirements for modifying the existing heating plants to accommodate the geothermal resource; (3) the possible use of shallow, unconfined groundwater with heat pumps as another energy alternative; and (4) the economic costs and benefits of both deep and shallow-water hydrothermal application.

1982-03-01T23:59:59.000Z

355

MHD retrofit of steam power plants. Feasibility study. Summary and conclusions, Part I  

DOE Green Energy (OSTI)

The US Department of Energy Division of Magnetohydrodynamics (DOE/MHD) initiated this study to evaluate the feasibility of a retrofit option to reduce the time and cost of commercializing MHD. The MHD retrofit option will integrate a nominal 260 megawatt thermal (MWt) MHD topping cycle into an existing or scheduled private utility steam plant; this facility will test both the MHD system and the combined operation of the MHD/steam plant. The 260 MWt input level was determined to be the size which could most effectively demonstrate and verify the engineering design and operational characteristics of a coal-fired, open-cycle, MHD power plant. Details are presented. A goal of the MHD program is to have operational by the year 2003 a commercial size, fully integrated MHD plant. This would be accomplished by demonstrating commercial scale, baseload performance of a fully integrated, MHD/steam power plant. (WHK)

Not Available

1979-07-01T23:59:59.000Z

356

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

357

Economic feasibility study of a wood gasification-based methanol plant: A subcontract report  

DOE Green Energy (OSTI)

This report presents an economic feasibility study for a wood-gasification-based methanol plant. The objectives were to evaluate the current commercial potential of a small-scale, wood-fed methanol plant using the SERI oxygen-blown, pressurized, down-draft gasifier technology and to identify areas requiring further R and D. The gasifier gas composition and material balance were based on a computer model of the SERI gasifier since acceptable test data were not available. The estimated capital cost was based on the Nth plant constructed. Given the small size and commercial nature of most of the equipment, N was assumed to be between 5 and 10. Only large discrepancies in gasifier output would result in significant charges in capital costs. 47 figs., 55 tabs.

Not Available

1987-04-01T23:59:59.000Z

358

Preliminary feasibility study of heating and cooling alternatives for Nebraska Western College, Scottsbluff, Nebraska  

DOE Green Energy (OSTI)

The existence of a recently-recognized, low-temperature, geothermal resource under central and western Nebraska represents a potential alternate energy source. The feasibility of using that resource for space heating and cooling at Nebraska Western College, Scottsbluff, Nebraska, as an alternative to that facility's current, natural-gas fired, heating and cooling system is explored. This study addresses: (1) the geological (hydrological) aspects of such a project; (2) the retrofitting requirements for modifying the existing heating plants to accommodate the geothermal resource; (3) the possible use of shallow, unconfined groundwater with heat pumps as another energy alternative; and (4) the economic costs and benefits of both deep and shallow-water hydrothermal application.

Not Available

1982-03-01T23:59:59.000Z

359

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

360

BNL Building 650 lead decontamination and treatment feasibility study. Final report  

SciTech Connect

Lead has been used extensively at Brookhaven National Laboratory (BNL) for radiation shielding in numerous reactor, accelerator and other research programs. A large inventory of excess lead (estimated at 410,000 kg) in many shapes and sizes is currently being stored. Due to it`s toxicity, lead and soluble lead compounds are considered hazardous waste by the Environmental Protection Agency. Through use at BNL, some of the lead has become radioactive, either by contamination of the surface or through activation by neutrons or deuterons. This study was conducted at BNL`s Environmental and Waste Technology Center for the BNL Safety and Environmental Protection Division to evaluate feasibility of various treatment options for excess lead currently being stored. The objectives of this effort included investigating potential treatment methods by conducting a review of the literature, developing a means of screening lead waste to determine the radioactive characteristics, examining the feasibility of chemical and physical decontamination technologies, and demonstrating BNL polyethylene macro-encapsulation as a means of treating hazardous or mixed waste lead for disposal. A review and evaluation of the literature indicated that a number of physical and chemical methods are available for decontamination of lead. Many of these techniques have been applied for this purpose with varying degrees of success. Methods that apply mechanical techniques are more appropriate for lead bricks and sheet which contain large smooth surfaces amenable to physical abrasion. Lead wool, turnings, and small irregularly shaped pieces would be treated more effectively by chemical decontamination techniques. Either dry abrasion or wet chemical methods result in production of a secondary mixed waste stream that requires treatment prior to disposal.

Kalb, P.D.; Cowgill, M.G.; Milian, L.W. [and others

1995-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Feasibility study of networks. Progress report, July 15, 1975--July 14, 1976  

SciTech Connect

The Laboratory for Nuclear Science has continued its study into the feasibility of networks, changing the focus of the investigation from the possible ways of collaborating with the MIT Information Processing Center in implementing a connection to the ARPA net to a wider consideration of the implications of computer resource sharing via networks. This report describes experiments performed on the ARPA net in collaboration with the Lawrence Berkeley Laboratory and experiments in more conventional forms of remote job entry to that site and others in ERDA. It discusses the use of the Multics mail as set up for ERDA, comparing it to other mail systems. Plans for future experiments in the ARPA net and for investigation of networks other than the ARPA net are proposed. The conclusion was reached that resource sharing via networks is both feasible and desirable provided certain interface problems are solved. Recommendations are made for more investigation into the human factors involved in network use, methods of providing consulting help to users, and determination of the most cost effective use of remote resource sharing. For the Laboratory for Nuclear Science, it is concluded that access to other ERDA computers via networks will meet some of our computing needs now and more in the future. However, remote resource sharing can be used only to supplement the on site computer, not replace it. At the present time, the best method of accessing the ARPA net for our users is via the MIT Multics System. However, as a permanent solution, a mini-host located in our computer center may provide more capability. In the next year, we plan to work out methods of attacking the problems of interfacing to the ARPA net and to use it in a limited manner for actual production work.

Campbell, E.J.; Kannel, M.; Saffran, K.

1976-04-30T23:59:59.000Z

362

Editorial: Time for green certification for all hydropower?  

Science Conference Proceedings (OSTI)

While accrediting a large hydropower facility is intrinsically more complex and potentially controversial, it is time to review the progress made in understanding the environmental impacts of large hydropower and the development of environmentally friendly hydropower systems. Over the last two decades, many in-field, laboratory, and modeling technologies have been developed or improved to better understand the mechanisms of fish injury and mortality and to identify turbine design and operation alternatives to reduce such impacts. In 2010, representatives of DOE and the US Department of Interior, and USACE signed a memorandum of understanding to work more closely to develop sustainable hydropower. One of their major objectives is to increase hydropower generation using low-impact and environmentally sustainable approaches. Given the recent scientific and technological advances that have decreased the environmental impact of hydropower and the need to aggressively facilitate development of low impact hydropower, we think it is indeed time to initiate a science-based green certification program that includes rigorous criteria for environmental protection but does not exclude hydropower based on size only.

Deng, Zhiqun; Carlson, Thomas J.

2012-04-10T23:59:59.000Z

363

Short-term hydropower production planning by stochastic programming  

Science Conference Proceedings (OSTI)

Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of ... Keywords: Hydropower, OR in energy, Scenarios, Stochastic programming

Stein-Erik Fleten; Trine Krogh Kristoffersen

2008-08-01T23:59:59.000Z

364

Feasibility study of the seismic reflection method in Amargosa Desert, Nye County, Nevada  

Science Conference Proceedings (OSTI)

The US Geological Survey (USGS) working under an Interagency agreement with the Department of Energy is engaged in a broad geoscience program to assess and identify a potential repository for high level nuclear waste at Yucca Mountain, Nye County, Nevada. The USGS program, referred to as the Yucca Mountain Project, or YMP, consists of integrated geologic, hydrologic and geophysical studies which range in nature from site specific to regional. This report is an evaluation of different acquisition methods for future regional seismic reflection studies to be conducted in the vicinity of Yucca Mountain, located in the southwestern corner of the Nevada Test Site (NTS). In January 1988, field studies were conducted to investigate the feasibility of using the common-depth point (CDP) seismic reflection method to map subsurface geological horizons within the Amargosa Desert, Nye County, Nevada. The goal of the field study was to investigate which seismic reflection method(s) should be used for mapping shallow to lower-crustal horizons. Therefore, a wide-variety of field acquisition parameters were tested, included point versus linear receiver group arrays; Vibroseis (service and trademark of Conoco, Inc.) versus explosive sources; Vibroseis array patterns; and Vibroseis sweep and frequency range. 31 refs., 33 figs., 8 tabs.

Brocher, T.M.; Hart, P.E.; Carle, S.F.

1990-11-01T23:59:59.000Z

365

16 Projects To Advance Hydropower Technology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

366

Property:PotentialHydropowerGeneration | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerGeneration PotentialHydropowerGeneration Jump to: navigation, search Property Name PotentialHydropowerGeneration Property Type Quantity Description The estimated potential energy generation from Hydropower for a particular place. Use this type to express a quantity of energy. The default unit for energy on OpenEI is the Kilowatt hour (kWh), which is 3,600,000 Joules. http://en.wikipedia.org/wiki/Unit_of_energy It's possible types are Watt hours - 1000 Wh, Watt hour, Watthour Kilowatt hours - 1 kWh, Kilowatt hour, Kilowatthour Megawatt hours - 0.001 MWh, Megawatt hour, Megawatthour Gigawatt hours - 0.000001 GWh, Gigawatt hour, Gigawatthour Joules - 3600000 J, Joules, joules Pages using the property "PotentialHydropowerGeneration" Showing 25 pages using this property. (previous 25) (next 25)

367

Property:PotentialHydropowerSites | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerSites PotentialHydropowerSites Jump to: navigation, search Property Name PotentialHydropowerSites Property Type Number Description The number of potential hydropower sites in a place. Pages using the property "PotentialHydropowerSites" Showing 25 pages using this property. (previous 25) (next 25) A Alabama + 2,435 + Alaska + 3,053 + Arizona + 1,958 + Arkansas + 3,268 + C California + 9,692 + Colorado + 5,060 + Connecticut + 659 + D Delaware + 25 + F Florida + 493 + G Georgia + 2,100 + H Hawaii + 437 + I Idaho + 6,706 + Illinois + 1,330 + Indiana + 1,142 + Iowa + 2,398 + K Kansas + 3,201 + Kentucky + 1,394 + L Louisiana + 934 + M Maine + 1,373 + Maryland + 491 + Massachusetts + 560 + Michigan + 1,942 + Minnesota + 1,391 + Mississippi + 1,536 + Missouri + 5,089 +

368

Event:Hydropower Africa 2012 | Open Energy Information  

Open Energy Info (EERE)

2012 2012 Jump to: navigation, search Calendar.png Hydropower Africa 2012: on 2012/09/04 "Hydropower Africa 2012 is the largest hydropower event of its kind in Africa boasting over 450 visitors from across the globe. It looks at planned projects and tender prospects for hydropower development in Africa and innovative funding solutions for projects - big and small. Refurbishment and modernisation updates of major hydropower facilities as well as operation and maintenance best practices from across the continent will be presented and discussed. Infrastructure development and African-appropriate engineering solutions to provide power to villages, rural areas and urban communities and achieving operational objectives while addressing environment and social challenges will be examined through

369

16 Projects To Advance Hydropower Technology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects To Advance Hydropower Technology Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

370

U.S. hydropower resource assessment for Alaska  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alaska.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

371

U.S. hydropower resource assessment for Minnesota  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Minnesota.

Francfort, J.E.

1996-07-01T23:59:59.000Z

372

U.S. hydropower resource assessment for Michigan  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Michigan.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

373

U.S. hydropower resource assessment for Idaho  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.

Conner, A.M.; Francfort, J.E.

1998-08-01T23:59:59.000Z

374

U.S. hydropower resource assessment for Illinois  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Illinois.

Conner, A.M.; Francfort, J.E.

1997-01-01T23:59:59.000Z

375

U.S. hydropower resource assessment for Alabama  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alabama.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

376

U.S. hydropower resource assessment for Oregon  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Oregon.

Conner, A.M.; Francfort, J.E.

1998-03-01T23:59:59.000Z

377

U.S. hydropower resource assessment for Mississippi  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Mississippi.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

378

U.S. hydropower resource assessment for Connecticut  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydro-power potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Connecticut.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

379

U.S. hydropower resource assessment for New Mexico  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of New Mexico.

Conner, A.M.; Francfort, J.E.

1997-03-01T23:59:59.000Z

380

U.S. hydropower resource assessment for Florida  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Florida.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

U.S. hydropower resource assessment for Kentucky  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Kentucky.

Conner, A.M.; Francfort, J.E.

1998-07-01T23:59:59.000Z

382

U.S. hydropower resource assessment for Maine  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydro-power potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Maine.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

383

U.S. hydropower resource assessment for North Carolina  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of North Carolina.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

384

U.S. hydropower resource assessment for Tennessee  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Tennessee.

Conner, A.M.; Francfort, J.E.

1997-07-01T23:59:59.000Z

385

U.S. hydropower resource assessment for Pennsylvania  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Pennsylvania.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

386

U.S. hydropower resource assessment for Maryland  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Maryland.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

387

U.S. hydropower resource assessment for West Virginia  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of West Virginia.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

388

U.S. hydropower resource assessment for Arizona  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Arizona.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

389

U.S. hydropower resource assessment for Nebraska  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nebraska.

Conner, A.M.; Francfort, J.E.

1997-04-01T23:59:59.000Z

390

U.S. hydropower resource assessment for Ohio  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Ohio.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

391

U.S. Hydropower Resource Assessment Final Report  

DOE Green Energy (OSTI)

To provide a more accurate assessment of the domestic undeveloped hydropower capacity, the US Department of Energy's Hydropower Program developed a computer model, Hydropower Evaluation Software (HES). HES allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental, legal, and institutional attributes present, and generate reports based on these suitability factors. This report describes the development of HES, its data requirements, and its application to each state assessment; in addition, it summarizes the data derivation process and data for the states. Modeling of the undeveloped hydropower resources in the US, based on environmental, legal, and institutional constraints, has identified 5,677 sites that have a total undeveloped capacity of about 30,000 megawatts.

A. M. Conner; J. E. Francfort; B. N. Rinehart

1998-12-01T23:59:59.000Z

392

U.S. hydropower resource assessment for Nevada  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nevada.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

393

U.S. hydropower resource assessment for New York  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of New York.

Conner, A.M.; Francfort, J.E.

1998-08-01T23:59:59.000Z

394

U.S. hydropower resource assessment for South Carolina  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. To assist in providing this estimate, the Idaho National Engineering Laboratory developed the Hydropower Evaluation Software (HES) computer model. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of South Carolina.

Conner, A.M.; Francfort, J.E.

1997-06-01T23:59:59.000Z

395

The Next Generation of Hydropower Engineers and Scientists | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Mike Reed Water Power Program Manager, Water Power Program As the nation continues to rely on hydropower to help meet its energy needs, a new generation of engineers and scientists is finding ways to make hydropower technologies more efficient, environmentally friendly and cost effective. The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE), in cooperation with the Hydro Research

396

Feasibility study 100 K East Area water purification pools fish-rearing program  

Science Conference Proceedings (OSTI)

As part of the feasibility study, a design analysis was conducted to determine the usefulness of the existing sand filters and associated media for reuse. The sand filters which were studied for potential reuse are located on the northern end of the 100-K East Area water filtration plant on the Hanford Site. This plant is located about one- half mile from the Columbia River. The sand filters were originally part of a system which was used to provide cooling water to the nearby plutonium production K Reactors. This Cold War operation took place until 1971, at which time the K Reactors were closed for eventual decontamination and decommissioning. Recently, it was decided to study the concept of putting the sand filter structures back into use for fish-rearing purposes. Because the water that circulated through the water purification pools (K Pools) and associated sand filters was clean river water, there is little chance of the structures being radioactively contaminated. To date, separate K Pools have been used for raising a variety of cold water fish species, including white sturgeon and fall chinook salmon, as well as for providing potable water to the 100 K Area of the Hanford Site for fire and service water purposes.

Betsch, M.D., Westinghouse Hanford

1996-07-03T23:59:59.000Z

397

Hydropower Technology Roundup Report: Hydropower Valuation: Appraising Hydro as a Provider of Energy, Ecocultural, and Socioeconomic Benefits  

Science Conference Proceedings (OSTI)

Hydro project owners and operators need improved methods for determining the total value that hydropower facilities deliver to the diverse communities they serve and affect. This Hydropower Technology Roundup report provides information about existing valuation methodologies and offers a new, comprehensive framework applicable to valuation activities.

2005-03-15T23:59:59.000Z

398

Advanced Test Reactor LEU Fuel Conversion Feasibility Study -- 2006 Annual Report  

SciTech Connect

The Advanced Test Reactor (ATR) is a high power density and high neutron flux research reactor operating in the U.S. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth with a maximum unperturbed thermal neutron flux rating of 1.0 x 1015 n/cm2–s. Because of these operating parameters, and the large test volumes located in high flux areas, the ATR is an ideal candidate for assessing the feasibility of converting an HEU driven reactor to a low-enriched core. The present work investigates the necessary modifications and evaluates the subsequent operating effects of this conversion. A detailed plate-by-plate MCNP ATR 1/8th core model was developed and validated for a fuel cycle burnup comparison analysis. Using the current HEU U-235 enrichment of 93.0 % as a baseline, an analysis can be performed to determine the low-enriched uranium (LEU) density and U 235 enrichment required in the fuel meat to yield an equivalent Keff between the HEU core and a LEU core versus effective full power days (EFPD). The MCNP ATR 1/8th core model will be used to optimize the U 235 loading in the LEU core, such that the differences in Keff and heat profile between the HEU and LEU core can be minimized for operation at 125 EFPD with a total core power of 115 MW. The Monte-Carlo coupled with ORIGEN2 (MCWO) depletion methodology was used to calculate Keff versus EFPDs. The MCWO-calculated results for the LEU case demonstrated adequate excess reactivity such that the Keff versus EFPDs plot is similar in shape to the reference ATR HEU case. The LEU core conversion feasibility study can also be used to optimize the U-235 content of each fuel plate, so that the relative radial fission heat flux profile is bounded by the reference ATR HEU case. The detailed radial, axial, and azimuthal heat flux profiles of the HEU and optimized LEU cases have been investigated. However, to demonstrate that the LEU core fuel cycle performance can meet the UFSAR safety requirements, additional studies will be necessary to evaluate and compare safety parameters such as void reactivity and Doppler coefficients, control components worth (OSCC, safety rods and regulating rod), and shutdown margins between the HEU and LEU cores.

G. S. Chang; R. G. Ambrosek

2006-10-01T23:59:59.000Z

399

Advanced Test Reactor LEU Fuel Conversion Feasibility Study (2006 Annual Report)  

SciTech Connect

The Advanced Test Reactor (ATR) is a high power density and high neutron flux research reactor operating in the United States. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth with a maximum unperturbed thermal neutron flux rating of 1.0 x 1015 n/cm2–s. Because of these operating parameters, and the large test volumes located in high flux areas, the ATR is an ideal candidate for assessing the feasibility of converting an HEU driven reactor to a low-enriched core. The present work investigates the necessary modifications and evaluates the subsequent operating effects of this conversion. A detailed plate-by-plate MCNP ATR 1/8th core model was developed and validated for a fuel cycle burnup comparison analysis. Using the current HEU U 235 enrichment of 93.0 % as a baseline, an analysis can be performed to determine the low-enriched uranium (LEU) density and U-235 enrichment required in the fuel meat to yield an equivalent K-eff between the HEU core and the LEU core versus effective full power days (EFPD). The MCNP ATR 1/8th core model will be used to optimize the U-235 loading in the LEU core, such that the differences in K-eff and heat profile between the HEU and LEU core can be minimized for operation at 125 EFPD with a total core power of 115 MW. The depletion methodology, Monte-Carlo coupled with ORIGEN2 (MCWO), was used to calculate K-eff versus EFPDs. The MCWO-calculated results for the LEU case demonstrated adequate excess reactivity such that the K-eff versus EFPDs plot is similar in shape to the reference ATR HEU case. The LEU core conversion feasibility study can also be used to optimize the U-235 content of each fuel plate, so that the relative radial fission heat flux profile is bounded by the reference ATR HEU case. The detailed radial, axial, and azimuthal heat flux profiles of the HEU and optimized LEU cases have been investigated. However, to demonstrate that the LEU core fuel cycle performance can meet the UFSAR safety requirements, additional studies will be necessary to evaluate and compare safety parameters such as void reactivity and Doppler coefficients, control components worth (outer shim control cylinders (OSCCs), safety rods and regulating rod), and shutdown margins between the HEU and LEU cores.

Gray S. Chang; Richard G. Ambrosek; Misti A. Lillo

2006-12-01T23:59:59.000Z

400

Feasibility study for early removal of HEU from CPP-651-Phase II  

SciTech Connect

A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology and the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.

Smith, C.V.; Henry, R.; Milligan, C.; Harmon, B.; Peterson, J.; Thom, M.A.; Campbell, R.; Hendrix, B.

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Feasibility study for anaerobic digestion of agricultural crop residues. Final report  

DOE Green Energy (OSTI)

This study provides cost estimates for the pretreatment/digestion of crop residues to fuel gas. Agricultural statistics indicate that the crop residues wheat straw, corn stover, and rice straw are available in sufficient quantity to provide meaningful supplies of gas. Engineering economic analyses were performed for digestion of sheat straw, corn stover, and rice straw for small farm, cooperative, and industrial scales. The results of the analyses indicate that the production of fuel gas from these residues is, at best, economically marginal, unless a credit can be obtained for digester effluent. The use of pretreatment can double the fuel gas output but will not be economically justifiable unless low chemical requirements or low-cost chemicals can be utilized. Use of low-cost hole-in-the-ground batch digestion results in improved economics for the small farm size digestion system, but not for the cooperative and industrial size systems. Recommendations arising from this study are continued development of autohydrolysis and chemical pretreatment of agricultural crop residues to improve fuel gas yields in an economically feasible manner; development of a low-cost controlled landfill batch digestion process for small farm applications; and determination of crop residue digestion by-product values for fertilizer and refeed.

Ashare, E.; Buivid, M. G.; Wilson, E. H.

1979-10-01T23:59:59.000Z

402

Feasibility study for anaerobic digestion of agricultural crop residues. Dynatech report No. 1935  

DOE Green Energy (OSTI)

The objective of this study was to provide cost estimates for the pretreatment/digestion of crop residues to fuel gas. A review of agricultural statistics indicated that the crop residues wheat straw, corn stover, and rice straw are available in sufficient quantity to provide meaningful supplies of gas. Engineering economic analyses were performed for digestion of wheat straw, corn stover, and rice straw for small farm-, cooperative-, and industrial scales. The small farm scale processed the residue from an average size US farm (400 acres), and the other sizes were two and three orders of magnitude greater. The results of the analyses indicate that the production of fuel gas from these residues is, at best, economically marginal, unless a credit can be obtained for digester effluent. The use of pretreatment can double the fuel gas output but will not be economically justifiable unless low chemical requirements or low cost chemicals can be utilized. Additional development is necessary in this area. Use of low cost hole-in-the-ground batch digestion results in improved economics for the small farm size digestion system, but not for the cooperative and industrial size systems. Recommendations arising from this study are continued development of autohydrolysis and chemical pretreatment of agricultural crop residues to improve fuel gas yields in an economically feasible manner; development of a low cost controlled landfill batch digestion process for small farm applications; and determination of crop residue digestion by-product values for fertilizer and refeed.

Ashare, E.; Buivid, M. G.; Wilson, E. H.

1979-07-31T23:59:59.000Z

403

Feasibility study: fuel cell cogeneration in a water pollution control facility. Final report  

DOE Green Energy (OSTI)

A conceptual design study was conducted to investigate the technical and economic feasibility of a cogeneration fuel cell power plant operating in a large water pollution control facility. The fuel cell power plant would use methane-rich digester gas from the water pollution control facility as a fuel feedstock to provide electrical and thermal energy. Several design configurations were evaluated. These configurations were comprised of combinations of options for locating the fuel cell power plant at the site, electrically connecting it with the water pollution control facility, using the rejected power plant heat, supplying fuel to the power plant, and for ownership and operation. A configuration was selected which met institutional/regulatory constraints and provided a net cost savings to the industry and the electric utility. This volume of the report contains the appendices: (A) abbreviations and definitions, glossary; (B) 4.5 MWe utility demonstrator power plant study information; (C) rejected heat utilization; (D) availability; (E) conceptual design specifications; (F) details of the economic analysis; (G) detailed description of the selected configuration; and (H) fuel cell power plant penetration analysis. (WHK)

Not Available

1980-02-01T23:59:59.000Z

404

Engineering assessment and feasibility study of Chattanooga Shale as a future source of uranium  

DOE Green Energy (OSTI)

This report describes the engineering, feasibility, economics, and environmental aspects of exploitation of Chattanooga Shale to recover U, synthetic crude oil, and byproduct Th, NH/sub 3/, S, Mo, V, Ni, and Co. It is concluded that the shale is a potential source of U, energy, and byproduct metals. This volume of the report covers the engineering description, feasibility, and economics of exploitation of the shale. (DLC)

Not Available

1978-06-01T23:59:59.000Z

405

Feasibility Study for Photovoltaics, Wind, solar Hot Water and Hybrid Systems  

DOE Green Energy (OSTI)

Southwestern Indian Polytechnic Institute (SIPI) located in Albuquerque New Mexico is a community college that serves American Indians and Alaska Natives. SIPI’s student body represents over 100 Native American Tribes. SIPI completed a renewable energy feasibility study program and established renewable energy hardware on the SIPI campus, which supplements and creates an educational resource to teach renewable energy courses. The SIPI campus is located, and has as student origins, areas, in which power is an issue in remote reservations. The following hardware was installed and integrated into the campus facilities: small wind turbine, large photovoltaic array that is grid-connected, two photovoltaic arrays, one thin film type, and one polycrystalline type, one dual-axis active tracker and one passive tracker, a hot air system for heating a small building, a portable hybrid photovoltaic system for remote power, and a hot water system to preheat water used in the SIPI Child Care facility. Educational curriculum has been developed for two renewable energy courses one being the study of energy production and use, and especially the roles renewable energy forms like solar, wind, geothermal, hydro, and biomass plays, and the second course being a more advanced in-depth study of renewable energy system design, maintenance, installation, and applications. Both courses rely heavily on experiential learning techniques so that installed renewable energy hardware is continuously utilized in hand-on laboratory activities and are part of the Electronics program of studies. Renewable energy technologies and science has also been included in other SIPI programs of study such as Environmental Science, Natural Resources, Agriculture, Engineering, Network Management, and Geospatial Technology.

Hooks, Ronald; Montoya, Valerie

2008-03-26T23:59:59.000Z

406

A Feasibility Study for Recycling Used Automotive Oil Filters In A Blast Furnace  

SciTech Connect

This feasibility study has indicated that of the approximately 120,000 tons of steel available to be recycled from used oil filters (UOF's), a maximum blast furnace charge of 2% of the burden may be anticipated for short term use of a few months. The oil contained in the most readily processed UOF's being properly hot drained and crushed is approximately 12% to 14% by weight. This oil will be pyrolized at a rate of 98% resulting in additional fuel gas of 68% and a condensable hydrocarbon fraction of 30%, with the remaining 2% resulting as carbon being added into the burden. Based upon the writer's collected information and assessment, there appears to be no operational problems relating to the recycling of UOF's to the blast furnace. One steel plant in the US has been routinely charging UOF's at about 100 tons to 200 tons per month for many years. Extensive analysis and calculations appear to indicate no toxic consideration as a result of the pyrolysis of the small contained oil ( in the 'prepared' UOFs) within the blast furnace. However, a hydrocarbon condensate in the ''gasoline'' fraction will condense in the blast furnace scrubber water and may require additional processing the water treatment system to remove benzene and toluene from the condensate. Used oil filters represent an additional source of high quality iron units that may be effectively added to the charge of a blast furnace for beneficial value to the operator and to the removal of this resource from landfills.

Ralph M. Smailer; Gregory L. Dressel; Jennifer Hsu Hill

2002-01-21T23:59:59.000Z

407

Feasibility study for automation of the Central Laboratories, Water Resources Division, U.S. Geological Survey  

SciTech Connect

This study of the feasibility of further automating the Central Laboratories deals specifically with the combined laboratory operations in Salt Lake City, Utah, and Denver, Colorado and is prepared with the understanding that such a system will also be implemented at the Central Laboratories in Atlanta, Georgia, and Albany, New York. The goals of automation are defined in terms of the mission of a water analysis laboratory, propose alternative computer systems for meeting such goals, and evaluate these alternatives in terms of cost effectiveness and other specified criteria. It is found that further automation will be beneficial and an in-house system that incorporates dual minicomputers is recommended: one for time-shared data acquisition, processing, and control; the second for data management. High-use analytical instruments are placed on-line to the time-shared minicomputer, with a terminal at each instrument and backup data storage on magnetic tape. A third, standby computer is switched in manually should the time-shared computer go down. Field-proven, modular hardware and software are chosen. Also recommended is the incorporation of the highly developed, computer-integrated instruments that are commercially available for determining petrochemicals and other organic substances, and are essential to the Laboratories' mission. (auth)

Morris, W.F.; Peck, E.S.; Fisher, E.R.; Barton, G.W. Jr.

1976-01-23T23:59:59.000Z

408

Majorana One-Tonne Cryostat Cooling Conceptual Feasibility Study Rev 1  

SciTech Connect

This report evaluates the conceptual plans for a cryostat cooling design for the MAJORANA DEMONSTRATOR (MJD) one-tonne (S4) experiment. This document is based upon previous design work and experimental results used to evaluate the current MJD thermal design. A feasibility study of a cooling system for S4 based on the MJD thermosiphon experiment is presented. The one-tonne experiment will be a scaled up version of the MJD. There will be many cryostats in the S4 experiment. In this document a cryostat with up to 19 strings of germanium crystals is analyzed. Aside from an extra outer ring of crystals, the geometry of the cryostat for S4 is very similar to that for the MJD thermosiphon experiment. The materials used in the fabrication of both of these ultra-low background experiments will be underground-electroformed copper. The current MJD uses a two-phase liquid-gas cooling system to provide constant operating temperature. This document presents a theoretical investigation of a cooling system for the S4 experiment and evaluates the heat transfer performance requirements for such a system.

Reid, Douglas J.; Fast, James E.; Orrell, John L.; Aguayo Navarrete, Estanislao

2011-06-27T23:59:59.000Z

409

The remedial investigation/feasibility study process at Oak Ridge National Laboratory  

SciTech Connect

Martin Marietta Energy Systems, Inc. (Energy Systems), manages and operates the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, under a cost-plus-award-fee contract administered by the Department of Energy`s (DOE) Oak Ridge Operations Office (Operations Office). Energy Systems` environmental restoration program is responsible for eliminating or reducing the risk posed by inactive and surplus sites and facilities that have been contaminated with radioactive, hazardous, or mixed wastes. The remedial investigation and feasibility study (RI/FS) is being conducted as part of Energy Systems` environmental restoration program. The objective of the audit was to determine if the proposed interim source control action identified in the ``Proposed Plan for the Oak Ridge National Laboratory Waste Area Grouping 6 Interim Remedial Action`` had been adequately justified. The audit disclosed that the proposed source control interim remedial action, three flexible membrane caps estimated to cost $140 million for waste area grouping 6, was not adequately justified. We recommended that DOE justify the proposed action before agreeing to proceed. The Manager, Oak Ridge Operations Office, generally concurred with the audit recommendations.

1993-10-01T23:59:59.000Z

410

Feasibility study: fuel cell cogeneration in a water pollution control facility. Final report  

DOE Green Energy (OSTI)

A conceptual design study was conducted to investigate the technical and economic feasibility of a cogeneration fuel cell power plant operating in a large water pollution control facility. In this particular application, the fuel cell power plant would use methane-rich digester gas from the water pollution control facility as a fuel feedstock to provide electrical and thermal energy. Several design configurations were evaluated. These configurations were comprised of combinations of options for locating the fuel cell power plant at the site, electrically connecting it with the water pollution control facility, using the rejected power plant heat, supplying fuel to the power plant, and for ownership and operation. A configuration was selected which met institutional/regulatory constraints and provided a net cost savings to the industry and the electric utility. The displacement of oil and coal resulting from the Bergen County Utilities Authority application was determined. A demonstration program based on the selected configuration was prepared to describe the scope of work, organization, schedules, and costs from preliminary design through actual tests and operation. The potential market for nationwide application of the concept was projected, along with the equivalent oil displacement resulting from estimated commercial application.

Not Available

1980-02-01T23:59:59.000Z

411

Phase I and II feasibility study report for the 300-FF-5 operable unit  

SciTech Connect

The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

NONE

1993-12-31T23:59:59.000Z

412

Cherokee Nation Enterprises Wind Energy Feasibility Study Final Report to U.S. DOE  

DOE Green Energy (OSTI)

CNE has conducted a feasibility study on the Chilocco property in north-central Oklahoma since the grant award on July 20, 2003. This study has concluded that there is sufficient wind for a wind farm and that with the Production Tax Credits and Green Tags, there will be sufficient energy to, not only cover the costs of the Nation’s energy needs, but to provide a profit. CNE has developed a wind energy team and is working independently and with industry partners to bring its renewable energy resources to the marketplace. We are continuing with the next phase in conducting avian, cultural and transmission studies, as well as continuing to measure the wind with the SoDAR unit. Cherokee Nation Enterprises, Inc. is a wholly-owned corporation under Cherokee Nation and has managed the Department of Energy grant award since July 20, 2003. In summary, we have determined there is sufficient wind for a wind farm at the Chilocco property where Cherokee Nation owns approximately 4,275 acres. The primary goal would be more of a savings in light of the electricity used by Cherokee Nation and its entities which totals an estimated eight million dollars per year. Cherokee Nation Enterprises (CNE), working independently and with industry partners, plans to bring its renewable energy resources into the marketplace through a well-documented understanding of our undeveloped resource. Our plan is to cultivate this resource in a way that will ensure the development and use for our energy will be in an environmentally and culturally acceptable form.

Carol E. Wyatt

2006-04-30T23:59:59.000Z

413

High Temperature Superconductivity -- A Joint Feasibility Study for a Power Application with High-Temperature Superconducting Cable by Peco Energy  

Science Conference Proceedings (OSTI)

Practical realization of high temperature superconductivity (HTS) technology is within the electric power industry's reach. This report documents a feasibility study co-sponsored by PECO Energy Company (PECO) to assess a real-world underground transmission application of this technology.

1998-11-17T23:59:59.000Z

414

High Temperature Superconductivity -- A Joint Feasibility Study for a Power Application with High-Temperature Superconducting Cable by South Carolina  

Science Conference Proceedings (OSTI)

Practical realization of high temperature superconductivity (HTS) technology is within the reach of the electric power industry. This report documents a feasibility study co-sponsored by South Carolina Electric and Gas Company (SCE&G) to assess a real-world underground transmission application of this technology.

1998-11-17T23:59:59.000Z

415

Federal Memorandum of Understanding for Hydropower/Participating Agencies |  

Open Energy Info (EERE)

Participating Agencies Participating Agencies < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Bonneville Power Administration: caption:Bonneville Power Administration Bonneville Power Administration Factsheet Bonneville Power Administration Publications Conservation Resource Energy Data - The Red Book Bureau of Indian Affairs: caption:Bureau of Indian Affairs Bureau of Indian Affairs Factsheet Tribal Energy and Environmental Clearinghouse (TEEIC) Office of Indian Energy and Economic Development (IEED) Division of Irrigation, Power and Safety of Dams Bureau of Reclamation: caption:Bureau of Reclamation Factsheet

416

A feasibility study for experimentally determining dynamic force distribution in a lap joint.  

SciTech Connect

Developing constitutive models of the physics in mechanical joints is currently stymied by inability to measure forces and displacements within the joint. The current state of the art estimates whole joint stiffness and energy loss per cycle from external measured force input and one or two acceleration responses. To validate constitutive models beyond this state requires a measurement of the distributed forces and displacements at the joint interface. Unfortunately, introducing measurement devices at the interface completely disrupts the desired physics. A feasibility study is presented for a non-intrusive method of solving for the interface dynamic forces from an inverse problem using full field measured responses. The responses come from the viewable surface of a beam. The noise levels associated with digital image correlation and continuous scanning laser Doppler velocimetry are evaluated from typical beam experiments. Two inverse problems are simulated. One utilizes the extended Sum of Weighted Accelerations Technique (SWAT). The second is a new approach dubbed the method of truncated orthogonal forces. These methods are much more robust if the contact patch geometry is well identified. Various approaches to identifying the contact patch are investigated, including ion marker tracking, Prussian blue and ultrasonic measurements. A typical experiment is conceived for a beam which has a lap joint at one end with a single bolt connecting it to another identical beam. In a virtual test using the beam finite element analysis, it appears that the SWAT inverse method requires evaluation of too many coefficients to adequately identify the force distribution to be viable. However, the method of truncated orthogonal forces appears viable with current digital image correlation (and probably other) imaging techniques.

Mayes, Randall Lee

2013-11-01T23:59:59.000Z

417

Preconceptual Feasibility Study to Evaluate Alternative Means to Produce Plutonium-238  

Science Conference Proceedings (OSTI)

There is currently no large-scale production of 238Pu in the United States. Feasibility studies were performed at the Idaho National Laboratory to assess the capability of developing alternative 238Pu production strategies. Initial investigations indicate potential capability to provision radioisotope-powered systems for future space exploration endeavors. For the short term production of 238Pu, sealed canisters of dilute 237Np solution in nitric acid could be irradiated in the Advanced Test Reactor (ATR). Targets in the large and medium “I” positions of the ATR were irradiated over a simulated period of 306 days and analyzed using MCNP5 and ORIGEN2.2. Approximately 0.5 kg of 238Pu could be produced annually in the ATR with purity greater than 92%. Optimization of the irradiation cycles could further increase the purity to greater than 98%. Whereas the typical purity of space batteries is between 80 to 85%, the higher purity 238Pu produced in the ATR could be blended with existing lower-purity inventory to produce useable material. Development of irradiation methods in the ATR provides the fastest alterative to restart United States 238Pu production. The analysis of 238Pu production in the ATR provides the technical basis for production using TRIGA® (Training, Research, Isotopes, General Atomics) nuclear reactors. Preliminary analyses envisage a production rate of approximately 0.7 kg annually using a single dedicated 5-MW TRIGA reactor with continuous flow loops to achieve high purity product. Two TRIGA reactors represent a robust means of providing at over 1 kg/yr of 238Pu annually using dilute solution targets of 237Np in nitric acid. Further collaboration and optimization of reactor design, radiochemical methods, and systems analyses would further increase annual 238Pu throughput, while reducing the currently evaluated reactor requirements.

John D. Bess; Matthew S. Everson

2013-02-01T23:59:59.000Z

418

Hydropower Resource Assessment of Brazilian Streams  

NLE Websites -- All DOE Office Websites (Extended Search)

feasibility criteria specified by the user in terms of proximity to a road, railroad, power plant, transmission line, substation, or populated place and whether selected...

419

Application of Flame Doctor to T-Fired Boilers: Feasibility Study  

Science Conference Proceedings (OSTI)

Flame Doctor, a burner diagnostic technology, is a packaged system consisting of hardware and software that ties into existing burner flame scanner systems of wall-fired, cyclone-fired, and turbo-fired boilers to provide real-time assessment of flame quality. This report describes feasibility tests to evaluate Flame Doctor for extension to tangentially fired (T-fired) boiler applications.

2007-03-22T23:59:59.000Z

420

Laser system for natural gas detection. Phase I. Laboratory feasibility studies  

SciTech Connect

Laboratory and field tests successfully proved the feasibility of laser remote sensing as a leak-survey tool in gas distribution systems. Using a pair of helium neon lasers to measure methane, the device exhibited at a 43-ft range a methane detection limit of 3 ppm in a gas plume with a 3.3-ft path length.

Grant, W.B.; Hinkley, E.D.

1981-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Policy-based self-adaptive architectures: a feasibility study in the robotics domain  

Science Conference Proceedings (OSTI)

Robotics is a challenging domain which sometimes exhibits a clear need for self-adaptive capabilities, as such functionality offers the potential for robots to account for their unstable and unpredictable deployment domains. This paper focuses on a feasibility ... Keywords: robotic architectures, self-adaptive software

John C. Georgas; Richard N. Taylor

2008-05-01T23:59:59.000Z

422

Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.  

Science Conference Proceedings (OSTI)

An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.

United States. Bonneville Power Administration.

1986-09-01T23:59:59.000Z

423

SUPERCRITICAL WATER PARTIAL OXIDATION PHASE I - PILOT-SCALE TESTING / FEASIBILITY STUDIES FINAL REPORT  

SciTech Connect

Under Cooperative Agreement No. DE-FC36-00GO10529 for the Department of Energy, General Atomics (GA) is developing Supercritical Water Partial Oxidation (SWPO) as a means of producing hydrogen from low-grade biomass and other waste feeds. The Phase I Pilot-scale Testing/Feasibility Studies have been successfully completed and the results of that effort are described in this report. The Key potential advantages of the SWPO process is the use of partial oxidation in-situ to rapidly heat the gasification medium, resulting in less char formation and improved hydrogen yield. Another major advantage is that the high-pressure, high-density aqueous environment is ideal for reaching and gasifying organics of all types. The high water content of the medium encourages formation of hydrogen and hydrogen-rich products and is especially compatible with high water content feeds such as biomass materials. The high water content of the medium is also effective for gasification of hydrogen-poor materials such as coal. A versatile pilot plant for exploring gasification in supercritical water has been established at GA's facilities in San Diego. The Phase I testing of the SWPO process with wood and ethanol mixtures demonstrated gasification efficiencies of about 90%, comparable to those found in prior laboratory-scale SCW gasification work carreid out at the University of Hawaii at Manoa (UHM) as well as other biomass gasification experience with conventional gasifiers. As in the prior work at UHM, a significant amount of the hydrogen found in the gas phase products is derived from the water/steam matrix. The studies at UHM utilized an indirectly heated gasifier with an acitvated carbon catalyst. In contrast, the GA studies utilized a directly heated gasifier without catalyst, plus a surrogate waste fuel. Attainment of comparable gasification efficiencies without catalysis is an important advancement for the GA process, and opens the way for efficient hydrogen production from low-value, dirty feed materials. The Phase I results indicate that a practical means to overcome limitations on biomass slurry feed concentration and preheat temperatuare is to coprocess an auxiliary high heating value material. SWPO coprocessing of tow hgih-water content wastes, partially dewatered sewage sludge and trap grease, yields a scenario for the production of hydrogen at highly competitive prices. It is estimated that there are hundreds if not thousands of potential sites for this technology across the US and worldwide.

SPRITZER,M; HONG,G

2005-01-01T23:59:59.000Z

424

Solar Energy and Small Hydropower Tax Credit (Personal) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Personal Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

425

Property:PotentialHydropowerCapacity | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerCapacity PotentialHydropowerCapacity Jump to: navigation, search Property Name PotentialHydropowerCapacity Property Type Quantity Description The nameplate capacity technical potential from Hydropower for a particular place. Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

426

A Boost for Hydropower (and the Economy) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) September 20, 2010 - 5:29pm Addthis The 91-year old Cheoah Dam in Robbinsville, North Carolina. The 91-year old Cheoah Dam in Robbinsville, North Carolina. Jacques Beaudry-Losique Director, Wind & Water Program There are approximately 2,400 hydropower dams in the U.S., many of which have not undergone a significant upgrade in decades. These older dams present a great opportunity to expand clean energy across the country, allowing us to rapidly increase generation capacity through the installation of new high-efficiency equipment. I recently got a firsthand look at one such effort when I helped kick off a project to modernize the 91-year old Cheoah Dam in Robbinsville, North

427

Solar Energy and Small Hydropower Tax Credit (Corporate) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Corporate Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

428

New Hydropower Turbines to Save Snake River Steelhead | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Turbines to Save Snake River Steelhead Hydropower Turbines to Save Snake River Steelhead New Hydropower Turbines to Save Snake River Steelhead May 24, 2010 - 1:23pm Addthis Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Joshua DeLung Hydropower harnesses water power to create reliable, clean and plentiful renewable energy, but dams can have an unintended impact on wildlife --

429

Microsoft Word - FINAL 2013 Hydropower Meeting Agenda 060713  

NLE Websites -- All DOE Office Websites (Extended Search)

SOUTHWESTERN FEDERAL HYDROPOWER MEETING The Earl Cabell Federal Building 1100 Commerce Street Red River Room Floor 7, Room 752A Dallas, Texas June 12 - 13, 2013 Wednesday, June 12...

430

Microsoft Word - FINAL 2013 HydropowerCouncilAgenda 060513  

NLE Websites -- All DOE Office Websites (Extended Search)

Southwestern Federal Hydropower Council The Earl Cabell Federal Building 1100 Commerce Street Red River Room Floor 7, Room 752A Dallas, Texas June 11 - 12, 2013 Monday, June 10...

431

Microsoft Word - FINAL 2010 Hydropower Council Agenda 052510...  

NLE Websites -- All DOE Office Websites (Extended Search)

AGENDA Southwestern Federal Hydropower Council Hilton Promenade at Branson Landing Branson, Missouri June 8 - 9, 2010 Tuesday, June 8 1:00 p.m. Welcome Little Rock District 1:05...

432

Microsoft Word - FINAL 2012HydropowerCouncilAgenda  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 Southwestern Federal Hydropower Council BLAKELY MOUNTAIN DAM PROJECT OFFICE Mountain Pine, Arkansas June 12 - 13, 2012 Tuesday, June 12 1:00 p.m. Welcome Vicksburg District...

433

Electrolysis Production of Hydrogen from Wind and Hydropower Workshop Proceedings  

Fuel Cell Technologies Publication and Product Library (EERE)

This document summarizes the opportunities and challenges for low-cost renewable hydrogen production from wind and hydropower. The Workshop on Electrolysis Production of Hydrogen from Wind and Hydropo

434

Small Businesses Key in Hydropower Tech Advancement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Businesses Key in Hydropower Tech Advancement Businesses Key in Hydropower Tech Advancement Small Businesses Key in Hydropower Tech Advancement September 6, 2011 - 2:59pm Addthis Earlier today, the Department of Energy and the Department of Interior announced nearly $17 million in funding over the next three years to advance hydropower technology. The funding announced today will go to sixteen innovative projects around the country, including sustainable small hydro projects, like the ones from Hydro Green Energy, a small business that handles hydroelectric power generation and power and communication line construction. The company, which has eight employees currently, has been awarded funding for two projects. Near Space Systems, a Colorado Springs-based company, is a service-disabled veteran-owned business with a manufacturing focus that's

435

Feasibility Study of Economics and Performance of Solar PV at the Atlas Industrial Park in Duluth, Minnesota  

SciTech Connect

The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.

Steen, M.; Lisell, L.; Mosey, G.

2013-01-01T23:59:59.000Z

436

Quantifying the Value of Hydropower in the Electric Grid  

Science Conference Proceedings (OSTI)

In an effort to quantify the full value of hydropower assets in a future electric grid, a team of researchers has looked at energy futures, regional markets, plant technologies, and operations. This report addresses the cost-side of the cost-benefit equation to be used when considering hydropower facility investments. It identifies construction and modification elements and estimates associated with costs for pumped storage, conventional hydro, and non-powered facilities. Cost data from original plant co...

2011-11-22T23:59:59.000Z

437

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former St. Marks Refinery in St. Marks, Florida  

NLE Websites -- All DOE Office Websites (Extended Search)

853 853 September 2010 Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former St. Marks Refinery in St. Marks, Florida A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Lands Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites Lars Lisell and Gail Mosey National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-6A2-48853 September 2010 Feasibility Study of Economics

438

Feasibility Study on the Enlargement of the Surface Repository for LILW at Mochovce, Slovak Republic  

SciTech Connect

In the Slovak Republic the sources of radioactive waste include the operation of the Mochovce and Bohunice nuclear power plants, decommissioning activities currently carried out and/or planned at Bohunice and elsewhere, as well as the use of radioactive sources in research, industry, and medicine. Pursuant to the Slovak policy low and intermediate level radioactive waste (LILW) containing predominantly short-lived radionuclides (LILW-SL), which is amenable for surface disposal, shall be disposed of at the National Radioactive Waste Repository (NRR) at Mochovce, which was designed to take all Slovak LILW-SL and which currently is in routine operation. The NRR site covers approximately 11 ha, currently only some 20 % of this area is used with two double rows of 20 reinforced concrete vaults each. The dimensions of a vault are 17.4 x 5.4 x 5.5 m, with an effective volume of 510 m{sup 3}. The total capacity of the two existing double rows (80 vaults) is enough to accommodate a net volume of radioactive waste of 22,320 m{sup 3}. Until the end of 2006 some 17 % of that capacity had already been used up. The NRR can receive in addition to the waste resulting from decommissioning the Bohunice A1 NPP pilot power reactor (under decommissioning since 1979) all the routinely produced Slovak waste until approximately 2020. However, the early shutdown of the Bohunice V1 Unit 1 end of 2006 and the planned shutdown of Unit 2 in 2008 with their following decommissioning will require additional disposal capacity well ahead of the initial time schedule. In this context it appears meaningful, to analyze anew the regulatory boundary conditions, existing disposal options and the corresponding waste categories. The main purpose of the feasibility study is to analyze alternatives for optimization of LILW management in the Slovak Republic as well as for the enlargement of the NRR at Mochovce, which will allow to dispose of the waste generated by the decommissioning of the nuclear power plants Bohunice A1 and V1 as well as waste arising from the operation of the Mochovce and Bohunice V2 NPPs and institutional waste. This paper describes the situation in the field of waste disposal in the Slovak Republic, the reasons leading to the decision of enlarging the NRR, the approach developed to select the optimum solution out of eight different enlargement variants, and first proposals and concepts for the enlargement of the NRR developed in the course of the project. (authors)

Haverkamp, B.; Biurrun, E. [DBE Technology GmbH, Peine (Germany); Sanchez Sudon, J. [INITEC NUCLEAR S.A., Madrid (Spain); Sedliak, D. [Jadrova a vyrad'ovacia spoloenost', a.s., Jaslovske Bohunice (Slovakia)

2008-07-01T23:59:59.000Z

439

Program on Technology Innovation: Flame Structure Sensor for PC Combustion - Feasibility Study  

Science Conference Proceedings (OSTI)

The flame-scanner sensor technology incorporated in the Flame Doctor system to provide critical burner state information in pulverized-coal applications is inherently limited in its ability to provide the type of information needed to make very rapid control adjustments. This project investigated the feasibility of two new types of flame-structure sensors for providing supplemental information about flame state that can be used for Flame Doctor system calibration and also for advanced high-speed burner c...

2007-05-16T23:59:59.000Z

440

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT  

SciTech Connect

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate al

BYRNES ME

2008-07-18T23:59:59.000Z

Note: This page contains sample records for the topic "hydropower feasibility study" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT  

SciTech Connect

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of

BYRNES ME

2008-07-18T23:59:59.000Z

442

Using Environmental Solutions to Lubrication at Hydropower Plants: A Hydropower Technology Round-Up Report, Volume 1  

Science Conference Proceedings (OSTI)

Hydropower owners and operators are confronted with the dual challenge of compliance with continually-developing environmental regulations and increasingly vigorous competition in the electric generation market. Managing this challenge requires consideration and selected application of new and emerging strategies and technologies. This volume of EPRI's Hydropower Technology Roundup Report presents an overview of research, practices, lessons learned, and some examples regarding the use of self-lubricating...

1999-10-28T23:59:59.000Z

443

WindPACT Turbine Design Scaling Studies Technical Area 3ÂŒSelf-Erecting Tower and Nacelle Feasibility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 * NREL/SR-500-29493 1 * NREL/SR-500-29493 Global Energy Concepts, LLC Kirkland, Washington WindPACT Turbine Design Scaling Studies Technical Area 3-Self-Erecting Tower and Nacelle Feasibility March 2000-March 2001 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 May 2001 * NREL/SR-500-29493 WindPACT Turbine Design Scaling Studies Technical Area 3-Self-Erecting Tower and Nacelle Feasibility March 2000-March 2001 Global Energy Concepts, LLC Kirkland, Washington NREL Technical Monitor: Alan Laxson Prepared under Subcontract No. YAM-0-30203-01 National Renewable Energy Laboratory 1617 Cole Boulevard

444

Feasibility study to evaluate plasma quench process for natural gas conversion applications. [Quarterly report], July 1, 1993--September 30, 1993  

SciTech Connect

The objective of this work was to conduct a feasibility study on a new process, called the plasma quench process, for the conversion of methane to acetylene. FY-1993 efforts were focused on determining the economic viability of this process using bench scale experimental data which was previously generated. This report presents the economic analysis and conclusions of the analysis. Future research directions are briefly described.

Thomas, C.P.; Kong, P.C.; Detering, B.A.

1993-12-31T23:59:59.000Z

445

www.friendsofthefox.org Fox?Wisconsin Heritage Parkway iAbstract National Heritage Area Feasibility Study Environmental Assessment  

E-Print Network (OSTI)

June 2009This study has been prepared to provide U.S. Congress and the public with information about the resources in the Fox?Wisconsin Heritage Parkway and their feasibility to become a National Heritage Area. Publication and transmittal of this report should not be considered an endorsement or commitment by the National Park Service. Authorization and funding for any commitments by the National Park Service will be considered with competing priorities for existing park system unites and programs.

Candice Mortara

2009-01-01T23:59:59.000Z

446

Program on Technology Innovation: Feasibility Study of Using a Thermosyphon Cooler Hybrid System to Reduce Cooling Tower Water Consu mption  

Science Conference Proceedings (OSTI)

This Technical Update describes the initial work accomplished by a feasibility study for using a newly developed Thermosyphon Cooler (TSC) Hybrid System to reduce cooling-tower water consumption at steam power plants. The report outlines the overall project and then details the applicable codes and standards that would apply to this technology. It also briefly touches on the literature and patents relating to this field. It describes the rationale and constraints involved in setting up the ...

2012-11-19T23:59:59.000Z

447

Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes  

SciTech Connect

This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

NONE

1996-10-01T23:59:59.000Z

448

Feasibility study for alternate fuels production: unconventional natural gas from wastewater treatment plants. Volume II, Appendix D. Final report  

DOE Green Energy (OSTI)

Data are presented from a study performed to determined the feasibility of recovering methane from sewage at a typical biological secondary wastewater treatment plant. Three tasks are involved: optimization of digester gas; digester gas scrubbing; and application to the East Bay Municipal Utility District water pollution control plant. Results indicate that excess digester gas can be used economically at the wastewater treatment plant and that distribution and scrubbing can be complex and costly. (DMC) 193 references, 93 figures, 26 tables.

Overly, P.; Tawiah, K.

1981-12-01T23:59:59.000Z

449

Conventional Hydropower Technologies (Fact Sheet), Wind And Water Power Program (WWPP)  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Power Water Power Program supports the development of technologies that harness the nation's renewable hydropower resources to generate environmentally sustainable and cost-effective electricity. Most conventional hydropower plants use a diver- sion structure, such as a dam, to capture water's potential energy via a turbine for electricity generation. The program's conventional hydropower activities focus on increasing generating capacity and efficiency at existing hydroelectric facilities, adding hydroelectric generating capacity to exist- ing non-powered dams, adding new low impact hydropower, increasing advanced pumped-storage hydropower capacity, and reducing potential environmental impacts of conven- tional hydropower production. The program's research and

450

Feasibility study: Application of the geopressured-geothermal resource to pyrolytic conversion or decomposition/detoxification processes  

DOE Green Energy (OSTI)

This study presents a preliminary evaluation of the technical and economic feasibility of selected conceptual processes for pyrolytic conversion of organic feedstocks or the decomposition/detoxification of hazardous wastes by coupling the process to the geopressured-geothermal resource. The report presents a detailed discussion of the resource and of each process selected for evaluation including the technical evaluation of each. A separate section presents the economic methodology used and the evaluation of the technically viable process. A final section presents conclusions and recommendations. Three separate processes were selected for evaluation. These are pyrolytic conversion of biomass to petroleum like fluids, wet air oxidation (WAO) at subcritical conditions for destruction of hazardous waste, and supercritical water oxidation (SCWO) also for the destruction of hazardous waste. The scientific feasibility of all three processes has been previously established by various bench-scale and pilot-scale studies. For a variety of reasons detailed in the report the SCWO process is the only one deemed to be technically feasible, although the effects of the high solids content of the geothermal brine need further study. This technology shows tremendous promise for contributing to solving the nation's energy and hazardous waste problems. However, the current economic analysis suggests that it is uneconomical at this time. 50 refs., 5 figs., 7 tabs.

Propp, W.A.; Grey, A.E.; Negus-de Wys, J.; Plum, M.M.; Haefner, D.R.

1991-09-01T23:59:59.000Z

451

Greenhouse Gas Emissions from U.S. Hydropower Reservoirs: FY2011 Annual Progress Report  

Science Conference Proceedings (OSTI)

The primary objective of this study is to quantify the net emissions of key greenhouse gases (GHG) - notably, CO{sub 2} and CH{sub 4} - from hydropower reservoirs in moist temperate areas within the U.S. The rationale for this objective is straightforward: if net emissions of GHG can be determined, it would be possible to directly compare hydropower to other power-producing methods on a carbon-emissions basis. Studies of GHG emissions from hydropower reservoirs elsewhere suggest that net emissions can be moderately high in tropical areas. In such areas, warm temperatures and relatively high supply rates of labile organic matter can encourage high rates of decomposition, which (depending upon local conditions) can result in elevated releases of CO{sub 2} and CH{sub 4}. CO{sub 2} and CH{sub 4} emissions also tend to be higher for younger reservoirs than for older reservoirs, because vegetation and labile soil organic matter that is inundated when a reservoir is created can continue to decompose for several years (Galy-Lacaux et al. 1997, Barros et al. 2011). Water bodies located in climatically cooler areas, such as in boreal forests, could be expected to have lower net emissions of CO{sub 2} and CH{sub 4} because their organic carbon supplies tend to be relatively recalcitrant to microbial action and because cooler water temperatures are less conducive to decomposition.

Stewart, Arthur J [ORNL; Mosher, Jennifer J [ORNL; Mulholland, Patrick J [ORNL; Fortner, Allison M [ORNL; Phillips, Jana Randolph [ORNL; Bevelhimer, Mark S [ORNL

2012-05-01T23:59:59.000Z

452

Feasibility study of landfill gas recovery at seven landfill sites, Adams County/Commerce City, Colorado. Final report  

DOE Green Energy (OSTI)

This report documents the findings of a major landfill gas recovery study conducted in Adams County, Colorado. The study was performed during the period from August 1979 through September 1980. The study was broad in scope, involving a technical, economic, and institutional feasibility analysis of recovering landfill-generated methane gas from seven sanitary landfills in southwestern Adams County. The study included: field extraction testing at the seven sistes; detailed legislative research and activity; a market survey, including preliminary negotiations; and preliminary design and cost estimates for gas recovery systems at all seven sites.

Not Available

1984-07-01T23:59:59.000Z

453