  1. Huaiji Hydroelectric Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup | Open EnergyInformationHorizon FuelHuaiji Hydroelectric Power

  2. 51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

    Broader source: Energy.gov [DOE]

    51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

  3. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  4. Energy 101: Hydroelectric Power

    Office of Energy Efficiency and Renewable Energy (EERE)

    Learn how hydroelectric power, or hydropower, captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.

  5. Appropriate technology for planning hydroelectric power projects in Nepal: the need for assumption analysis

    SciTech Connect (OSTI)

    Chandler, C.G.

    1981-06-01T23:59:59.000Z

    The study focuses on the project development process for hydroelectric project planning in Nepal. Chapter I describes the contrast between the vast potential for hydroelectric power development in Nepal and the current energy shortage within the country, not only for electricity, but for firewood and other fuel sources as well. Chapter II explores some of the unknown factors facing hydropower project planners in Nepal, where data for hydrologic, geologic, environmental, and sociological project components are lacking. The chapter also examines institutional and fiscal factors which constrain the planning process. Chapter III describes the critical role of assumptions in the project development process, and details the stages that a project goes through as it is planned. The chapter introduces the concept of assumption analysis as a technique for project planning, listing the potential conflict between the assumptions of foreign consultants and the host-country users of project outputs as an ingredient in the project's success or failure. Chapter IV demonstrates the mechanics and usefulness of assumption analysis through an Assumption Analysis Chart, which shows the interaction among project objectives, project alternatives, project assumptions, and the project development process. Assumption analysis techniques are expected to be useful among bilateral and multilateral aid donors servicing less developed countries.

  6. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  7. Resource Management Services: Water Regulation, Part 605: Applications for Diversion or Use of Water for Purposes Other Than Hydro-Electric Power Projects (New York)

    Broader source: Energy.gov [DOE]

    These rules apply to all applications for a license or a permit to take, divert, appropriate or otherwise use the waters of the State, except applications for hydro-electric power projects....

  8. Lost films chronicle dawn of hydroelectric power in the Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lost-films-chronicle-dawn-of-hydroelectric-power-in-the-Northwest Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

  9. EIS-0456: Cushman Hydroelectric Project, Tacoma, Washington

    Broader source: Energy.gov [DOE]

    This EIS is for the design and construction of certain components of the Cushman Hydroelectric Project in Mason County, Washington.

  10. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  11. Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls Hydroelectric Project: Final technical and construction cost report

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    The purpose of this report is to fulfill part of the requirement of the US Department of Energy (DOE) Cooperative Agreement Number FC07-80ID12125 of the Small Scale Hydropower Program and is submitted on behalf of the Broad River Electric Cooperative, Inc. of Gaffney, South Carolina. The project was initially studied in 1978 with construction commencing in January, 1984. The primary work elements of the project consisted of the renovation of an existing dam and a new powerhouse. The dam was rehabilitated and flashboards were installed along the top of the structure. The powerhouse was supplied with a single open pit turbine and a new substation was constructed. The project generated power in December of 1985 but has been plagued with numerous problems compounded by a flood in March, 1987 causing extensive damages. The flood of March, 1987 resulted in filing of litigative action by the developers against their project managers and engineers which has yet to reach settlement and will possibly culminate in court sometime during the fall of 1988.

  12. Following Nature's Current HYDROELECTRIC POWER IN THE NORTHWEST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Environmental Protection, Mitigation and Enhancement at Hydroelectric Projects ----10 Fish Passage Tour ---...

  13. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    SciTech Connect (OSTI)

    Curtis Miller

    2009-03-22T23:59:59.000Z

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  14. Hybrid Modeling and Control of a Hydroelectric Power Plant

    E-Print Network [OSTI]

    Ferrari-Trecate, Giancarlo

    Hybrid Modeling and Control of a Hydroelectric Power Plant Giancarlo Ferrari-Trecate, Domenico,mignone,castagnoli,morari}@aut.ee.ethz.ch Abstract In this work we present the model of a hydroelectric power plant in the framework of Mixed Logic with a model predictive control scheme. 1 Introduction The outflow control for hydroelectric power plants

  15. Stochastic Co-optimization for Hydro-Electric Power Generation

    E-Print Network [OSTI]

    1 Stochastic Co-optimization for Hydro-Electric Power Generation Shi-Jie Deng, Senior Member, IEEE the optimal scheduling problem faced by a hydro-electric power producer that simultaneously participates in multiple markets. Specifically, the hydro-generator participates in both the electricity spot market

  16. alto hydroelectric power: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 and 2, and the renewable project 5, clearly perform at the best plant 2001-01-01 12 Cold Climate Problems of a Micro- Hydroelectric Development on CiteSeer Summary:...

  17. DOWNSTREAM PASSAGE FOR SALMON AT HYDROELECTRIC PROJECTS IN THE COLUMBIA RIVER BASIN

    E-Print Network [OSTI]

    DOWNSTREAM PASSAGE FOR SALMON AT HYDROELECTRIC PROJECTS IN THE COLUMBIA RIVER BASIN: DEVELOPMENT Prepared for the Northwest Power Planning Council October 1997 97-15 #12;Published October 1997 by the Northwest Power Planning Council 851 SW 6th Avenue, Suite 1100 Portland, Oregon 97204 503-222-5161 Toll Free

  18. EIS-0184: South Fork Tolt River Hydroelectric Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes the Seattle City Light, a Department of the City of Seattle proposal to construct a hydroelectric project with an installed capacity of 15 MW on the South Fork Tolt River near the town of Carnation located in King County in the State of Washington.

  19. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect (OSTI)

    Joe Taddeucci, P E

    2013-03-29T23:59:59.000Z

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: √?¬Ę√?¬?√?¬Ę Increasing safety at Boulder Canyon Hydro √?¬Ę√?¬?√?¬Ę Increasing protection of the Boulder Creek environment √?¬Ę√?¬?√?¬Ę Modernizing and integrating control equipment into Boulder√?¬Ę√?¬?√?¬?s municipal water supply system, and √?¬Ę√?¬?√?¬Ę Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to

  20. Upper arun hydroelectric project feasibility study (phase 1). Volume 1. Report. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1987-09-01T23:59:59.000Z

    The report was prepared for Nepal Electricity Authority (NEA). The primary objective of the study was to compare several alternative development schemes to drive an optimum development plan for exploiting the hydroelectric potential of the Upper Arun River, to be further investigated in phase 2 of the feasibility study. The scope of work included reviewing the original project concepts establishing development alternatives investigations in the following fields: Toposurvey Mapping; Geology Geotechnics; Hydrology; Power Market; and Plan formulations.

  1. Model-Free Based Water Level Control for Hydroelectric Power Plants

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Model-Free Based Water Level Control for Hydroelectric Power Plants Cédric JOIN Gérard ROBERT for hydroelectric run-of-the river power plants. To modulate power generation, a level trajectory is planned for cascaded power plants. Numerous dynamic simulations show that with a simple and robust control algorithm

  2. Pricing Hydroelectric Power Plants with/without Operational Restrictions: a Stochastic Control Approach

    E-Print Network [OSTI]

    Forsyth, Peter A.

    Pricing Hydroelectric Power Plants with/without Operational Restrictions: a Stochastic Control of Waterloo, Waterloo ON, Canada N2L 3G1 Abstract. In this paper, we value hydroelectric power plant cash. The power plant valuation problem under a ramping constraint is characterized as a bounded stochastic

  3. Proceedings of: ''Formal Methods Europe'', March 1996, Oxford, UK, LNCS 1051, Springer Automatic Verification of a Hydroelectric Power

    E-Print Network [OSTI]

    Tronci, Enrico

    Verification of a Hydroelectric Power Plant 1 Rosario Pugliese Enrico Tronci Dip. di Scienze dell@univaq.it Abstract. We analyze the specification of a hydroelectric power plant by ENEL (the Italian Electric Company we report on the analysis of a hydroelectric power plant by ENEL (the Italian Electric Company). Our

  4. Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)

    E-Print Network [OSTI]

    Bookhagen, Bodo

    Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India private hydroelectric facility, located at the Baspa River which is an important left-hand tributary

  5. The Brasfield Hydroelectric Project: A model-prototype comparison

    SciTech Connect (OSTI)

    Gulliver, J.S.; Voigt, R.L. Jr.; Hibbs, D.E. [Univ. of Minnesota, Minneapolis, MN (United States)] [and others

    1995-12-31T23:59:59.000Z

    Observations made during start-up and operation of the 3 MW Brasfield Hydroelectric Project provide an excellent means of comparing physical model results with the prototype installation. During start-up, the turbine generator unit was operated without the surface vortex suppression grid in place to allow engineers to observe vortex formation without, and later with, the grid. The model performance is reproduced in the prototype with regard to surface vortices. Field data has also been obtained at 0.7 in depth increments to provide dissolved oxygen (D.O.) concentrations profiles in the reservoir and in the nearfield zone surrounding the intake. Parallel D.O. measurements at the powerhouse outlet and 1.6 km downstream of the outlet provide a good means of determining the average depth of water column from which the water was removed. Measurements of model velocities, scaled to the prototype, multiplied times the field measurements of dissolved oxygen (D.O.) concentration and water temperature provide a model-predicted downstream D.O. concentration that also compares well to that measured in the prototype. This paper provides support for an unconventional design technique which may be applicable to many other sites facing similar environmental constraints. The model-prototype comparison also provides a strong verification of the combined use of both physical and mathematical models to solve such a design problem.

  6. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    SciTech Connect (OSTI)

    Wood, Marilyn

    1984-06-01T23:59:59.000Z

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  7. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    SciTech Connect (OSTI)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01T23:59:59.000Z

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  8. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    SciTech Connect (OSTI)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01T23:59:59.000Z

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  9. UGP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    wildlife and power generation on the Missouri River. Seven dams and powerplants have the installed capacity of 2,610 MW. That hydroelectric power is delivered across about 7,919...

  10. MHK Projects/Deception Pass Tidal Energy Hydroelectric Project | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformationCygnet < MHK Projects Jump to:Notnac,

  11. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect (OSTI)

    Howerton, Jack; Hwang, Diana

    1984-11-01T23:59:59.000Z

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  12. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    SciTech Connect (OSTI)

    Bissell, Gael

    1985-01-01T23:59:59.000Z

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  13. Wildlife and Wildlife Habitat Mitigation Plan for Libby Hydroelectric Project, Final Report.

    SciTech Connect (OSTI)

    Mundinger, John

    1985-01-01T23:59:59.000Z

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Libby hydroelectric project. Mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. The report describes mitigation that has already taken place and 8 recommended mitigation projects designed to complete total wildlife mitigation. 8 refs., 2 figs., 12 tabs.

  14. Kainji hydroelectric project: a socio-economic post-impact assessment

    SciTech Connect (OSTI)

    Ugochuku, R.O.

    1987-01-01T23:59:59.000Z

    The Kainji hydroelectric dam was conceived in the early 1950s as a solution to Nigeria's urgent power needs. Considerable controversy surrounded the dam project. The initial controversial issue associated with the dam was centered on a decision whether to develop a thermal or hydro technology and whether the Federal Government's money was being used to develop a particular region to the economic disadvantage of other regions. When the power problems persisted even after the dam started operation, the question of whether the dam was delivering its projected functions also became an issue. This study is in the area of Social Management of Technology which is a concept that deals with decision processes for guiding technological changes such as those associated with the Kainji Dam, to derive maximum socioeconomic benefit from the technology and to minimize the undersirable side effects. The study found that electric power problems of Nigeria can be attributed to institutional problems and the general level of the country's development. This study also found that all the additional benefits of the dam have been overestimated and those reaping the additional benefits are different from those bearing the cost.

  15. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    SciTech Connect (OSTI)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01T23:59:59.000Z

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section provides the preliminary design of an experimental apparatus that will be used to expose fish to representative levels of turbulence in the laboratory.

  16. Sangzhi Zhongyuan Hydroelectric Power Station | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with form HistoryRistma AG Jump to:EnergysourceRamon,Sandur Power CompanySangzhi

  17. Microsoft PowerPoint - AECC Hydroelectric Generation 2010.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand Retrievals fromprocess usedGELustre FileBimodal Cialella 1 ,

  18. Following Nature's Current HYDROELECTRIC POWER IN THE NORTHWEST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New MexicoFinancingProofWorkingEnergyGo modelP e r f o r m a the

  19. Reaction of the dams behind the Toktoguol and Kurpsa hydroelectric power plants to repeated earthquakes

    SciTech Connect (OSTI)

    Marchuk, A.N.; Umralin, K.B.; Moldebehov, Z.I. [and others

    1994-11-01T23:59:59.000Z

    The region where the chain of Naryn hydroelectric power plants are located in the Kyrgyzstan Republic is a seismically active area of Central Tien-Shan and is comparatively well known in seismological respects. No means of measuring the dams themselves, however, were ever incorporated as an instrumental base of investigation. The seismometric possibilities of embedded monitoring-measuring apparatus were disclosed by O.Yu. Schmidt Institute of Earth Physics and have made is possible to evaluate the reactions of dams to seismic effects and of excited seismicity, when residual deformations due to repeated tremors of different force and direction are accumulated over an extended period of time.

  20. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect (OSTI)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01T23:59:59.000Z

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  1. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect (OSTI)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01T23:59:59.000Z

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  2. PROJECT HIGHLIGHTS In the first project of its kind, the Bonneville Power Administration teamed with the Pacific Northwest

    E-Print Network [OSTI]

    , which were narrowed to two areas for detailed assessment of subsurface storage capacity, power plant of power production from wind resources, and environmental requirements mandate the use of hydroelectricPROJECT HIGHLIGHTS In the first project of its kind, the Bonneville Power Administration teamed

  3. Belleville Hydroelectric Project: A {open_quotes}model{close_quotes} project

    SciTech Connect (OSTI)

    Hughes, B.R. [Northwest Hydraulic Consultants Ltd., North Vancouver, British Columbia (Canada); Gemperline, E.J. [Harza Engineering Co., Chicago, IL (United States); Meier, P.E. [American Municipal Power - Ohio, Inc., Westerville, OH (United States)

    1995-12-31T23:59:59.000Z

    With the development of hydropower stations at existing lock and dam structures, there is a need to develop a project layout that will provide efficient power generation with minimal impacts on the existing river conditions. Model studies have proven to be a cost effective method of ensuring that the most appropriate project layout is achieved prior to the large capital investment required for construction. Physical models provide a means of visualizing the overall project, including river flow patterns and sedimentation, and permit the acquisition of numerical data which can be used to aid in the refinement of the project design or to guide the regulatory bodies in assessing the potential impacts. As part of the proposed hydropower add-on at the existing Belleville Lock and Dam, a physical hydraulic model study was undertaken at Northwest Hydraulic Consultants laboratories in Vancouver, British Columbia to aid in the development of a project layout which would meet all project objectives. These objectives included refinement of the approach and tailrace channels to optimize the powerhouse performance and minimize the potential impacts on river navigation.

  4. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    SciTech Connect (OSTI)

    Bedrossian, Karen L.

    1984-08-01T23:59:59.000Z

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  5. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-10-01T23:59:59.000Z

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  6. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29T23:59:59.000Z

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project Ė Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the Cityís hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the Cityís Project Engineer, who had overseen the application, resigned and left the Cityís employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

  7. CRSP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expenses of the project each year, and receive all of the energy it produces. Salt Lake City AreaIntegrated Projects: Power from the Colorado River Storage Project plants was...

  8. Applicant DOE Award Project Location Project Focus Feasibility...

    Broader source: Energy.gov (indexed) [DOE]

    Tribe's acquisition and subsequent operation of the Kerr Hydroelectric project as a wholesale power generation facility. Confederated Tribes of the Colville Reservation 200,000...

  9. Upper arun hydroelectric project feasibility study (phase 1). Volume 2. Appendix. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1987-09-01T23:59:59.000Z

    The report was prepared for Nepal Electricity Authority (NEA). The primary objective of the study was to compare several alternative development schemes to drive an optimum development plan for exploiting the hydroelectric potential of the Upper Arun River, to be further investigated in phase 2 of the feasibility study. The report presents the result of the phase I studies investigations recommends the alternatives to be pursued to develop the Upper Arun River. Volume 2 contains tables, figures and other supporting materials.

  10. What is the role of hydroelectric power in the United States?

    Reports and Publications (EIA)

    2011-01-01T23:59:59.000Z

    The importance of hydropower as a source of electricity generation varies by geographic region. While hydropower accounted for 6% of total U.S. electricity generation in 2010, it provided over half of the electricity in the Pacific Northwest. Because hydroelectric generation relies on precipitation, it varies widely from month to month and year to year.

  11. EIS-0150: Salt Lake City Area Integrated Projects Electric Power Marketing

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects hydroelectric power plants.

  12. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-07-01T23:59:59.000Z

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  13. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    SciTech Connect (OSTI)

    Vaught, Douglas J.

    2007-03-31T23:59:59.000Z

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNCís technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clarkís Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clarkís Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  14. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    SciTech Connect (OSTI)

    None,

    1980-05-01T23:59:59.000Z

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  15. Annual Review of BPA-Funded Fish and Wildlife Projects in Montana, November 28-29, 1984.

    SciTech Connect (OSTI)

    Drais, Gregory

    1985-01-01T23:59:59.000Z

    Brief summaries of projects investigating the impacts of hydroelectric power projects in Montana on fish and wildlife values are presented. (ACR)

  16. Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...

    Energy Savers [EERE]

    Policy Act of 2005. Qualified hydroelectric facilities-existing powered or non-powered dams and conduits that added a new turbine or other hydroelectric generating device-may...

  17. Rent sharing in the Clean Development Mechanism The Case of the Tahumanu Hydroelectric Project in Bolivia

    E-Print Network [OSTI]

    Paris-Sud XI, Universitť de

    in Bolivia Christophe de Gouvello PhD, Senior Research Fellow at CIRED. Member of the French Delegation. Keywords : Bolivia, power sector, GHG emission reductions, private sector, decision process, carbon rent

  18. Siphon penstock installations at hydroelectric projects: A survey of design, construction and operating experience

    SciTech Connect (OSTI)

    Burgoine, D.; Rodrigue, P.; Tarbell, J.C. (Acres International Corp., Amherst, NY (USA); Acres International Corp., Amherst, NY (USA). Mechanical Engineering Dept.; Acres International Corp., Amherst, NY (USA))

    1989-01-01T23:59:59.000Z

    There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock installations. The design considerations, construction and operating aspects of siphon penstock installations are described here. 4 figs., 1 tab.

  19. Nuclear Power Plant Design Project

    E-Print Network [OSTI]

    Nuclear Power Plant Design Project A Response to the Environmental and Economic Challenge Of Global.............................................................................................................. 4 3. Assessment of the Issues and Needs for a New Plant

  20. Power Politics: The Political Economy of Russia's Electricity Sector Liberalization

    E-Print Network [OSTI]

    Wengle, Susanne Alice

    2010-01-01T23:59:59.000Z

    Sayano-Shushenskaia Hydroelectric Power Plant is Siberiaíssome of the largest hydroelectric power plants in the worldplant, Sayano-Shushenskaia Hydroelectric Power Plant (SSGES,

  1. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    SciTech Connect (OSTI)

    Casey, Daniel

    1984-10-01T23:59:59.000Z

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  2. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  3. Main Canal, Maverick County Water Control and Improvement District above Central Power and Light hydro-electric plant, at Maverick and Kinney Counties, Texas

    E-Print Network [OSTI]

    Ledbetter, John J

    1952-01-01T23:59:59.000Z

    BAIN CANAL NA~ICK COUNTY WATW CONTROL AND INPROllZXBZ DISTRICT ABOVE C~ POWER AND LION HYDRO ELECTRIC PLANT& AT, SIAVERICK AND KINNEY COUNT'S, T~~S By John J. Ledbetter, Jr. Approved as to style and content by: (Che man Committee Heed of pa... ment or Student Advisor May l952 MAIN CANAL RIA~ICK C01E1TY EATER CONTROL AND INPROVZGiWZ DISTRICT ABOVE G~ F01' AND LIGHT HYDRO-ELECTRIC PLANT, AT MAVERICK AND KINNEY GGKJZIES ~ TEXAS By John J. Ledbetter, Jr, A Thesis Submitted...

  4. DSW Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada...

  5. Power Politics: The Political Economy of Russia's Electricity Sector Liberalization

    E-Print Network [OSTI]

    Wengle, Susanne Alice

    2010-01-01T23:59:59.000Z

    hydro-electric power plant, Sayano-Shushenskaia Hydroelectric Power Plant (SSGES, Russiaís hydro-electric power. Unlike in European Russia, where theRussiaís utilities, while Rusal targeted Siberian hydro-electric power

  6. Energy 101: Hydroelectric Power

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.

  7. Hydroelectric Power Plants

    E-Print Network [OSTI]

    Purpose The Purpose

    Contents Purpose ..................... 1-1 1-1 Applicability .................. 1-2 1-1 References .................... 1-3 1-1 Limitations ................... 1-4 1-1 Contents ..................... 1-5 1-1 Design Procedures .............. 1-6 1-1 Other Design Information ......... 1-7 1-2 Deviations .................... 1-8 1-2 General Design Practices .......... 1-9 1-2 Safety Provisions ............... 1-10 1-2 Francis-Type Turbines ............ 2-2 2-1 Francis-Type Pump Turbines ....... 2-3 2-3 Kaplan-Type Turbines ............ 2-4 2-4 Turbine Considerations ........... 3-2 3-1 Handling Provisions ............. 3-3 3-1 Service Systems ................ 3-4 3-1 Considerations ................. 4-2 4-1 Penstock Shutoff Valves at the Valve Requirement ......... 5-2 5-1 Valve Selection ........... 5-3 5-1 Cranes .................. 6-2 6-1 Crane Lifting Accessories .... 6-3 6-6 Hoists .................. 6-4 6-8 Justification .............. 7-2 7-1 Loc

  8. Collbran Project Power Sales Rate History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy only. Beginning October 1, 1987, all Collbran Project power became a Salt Lake City Area Integrated Projects resource. As of that date, direct sales to power customers...

  9. Microsoft PowerPoint - Vicksburg District Federal Power Projects...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1 ll Rotor...

  10. TEP Power Partners Project [Tucson Electric Power

    SciTech Connect (OSTI)

    None

    2013-11-19T23:59:59.000Z

    The Arizona Governorís Office of Energy Policy, in partnership with Tucson Electric Power (TEP), Tendril, and Next Phase Energy (NPE), formed the TEP Power Partners pilot project to demonstrate how residential customers could access their energy usage data and third party applications using data obtained from an Automatic Meter Reading (AMR) network. The project applied for and was awarded a Smart Grid Data Access grant through the U.S. Department of Energy. The project participantsí goal for Phase I is to actively engage 1,700 residential customers to demonstrate sustained participation, reduction in energy usage (kWh) and cost ($), and measure related aspects of customer satisfaction. This Demonstration report presents a summary of the findings, effectiveness, and customer satisfaction with the 15-month TEP Power Partners pilot project. The objective of the program is to provide residential customers with energy consumption data from AMR metering and empower these participants to better manage their electricity use. The pilot recruitment goals included migrating 700 existing customers from the completed Power Partners Demand Response Load Control Project (DRLC), and enrolling 1,000 new participants. Upon conclusion of the project on November 19, 2013: ? 1,390 Home Area Networks (HANs) were registered. ? 797 new participants installed a HAN. ? Survey respondentsí are satisfied with the program and found value with a variety of specific program components. ? Survey respondents report feeling greater control over their energy usage and report taking energy savings actions in their homes after participating in the program. ? On average, 43 % of the participants returned to the web portal monthly and 15% returned weekly. ? An impact evaluation was completed by Opinion Dynamics and found average participant savings for the treatment period1 to be 2.3% of their household use during this period.2 In total, the program saved 163 MWh in the treatment period of 2013.

  11. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Hydroelectric Power Project impacts Improve natural salmonid habitat and production #12;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from livestockRest from livestock;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from

  12. The Impacts of Wind Speed Trends and Long-term Variability in Relation to Hydroelectric

    E-Print Network [OSTI]

    Kohfeld, Karen

    and Long-term Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific through diversification. In hydroelectric dominated systems, like the PNW, the benefits of wind power can diversification can be maximized. Keywords: Wind power; Hydroelectricity; Renewable energy; Climate variability

  13. Optimizing Profits from Hydroelectricity Production

    E-Print Network [OSTI]

    Potvin, Jean-Yves

    Optimizing Profits from Hydroelectricity Production Daniel De Ladurantaye Michel Gendreau Jean the profits obtained by the stochastic model. Keywords: Hydroelectricity, electricity market, prices, dams countries deregulate their electricity market, new challenges appear for hydroelectricity producers

  14. Primal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including a

    E-Print Network [OSTI]

    Oliveira, Aurťlio R. L.

    that minimizes losses in the transmission and costs in the generation of a hydroelectric power system, formulated such perturbing parameter. Keywords-- Hydroelectric power system, Network flow, Predispatch, Primal-dual interiorPrimal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including

  15. Hydroelectric Plants (Iowa)

    Broader source: Energy.gov [DOE]

    A permit is required from the Executive Council of Iowa for the construction, maintenance, or operation of any hydroelectric facility. All applications will be subject to a public hearing.

  16. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect (OSTI)

    Jack Q. Richardson

    2012-06-28T23:59:59.000Z

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  17. Underground pumped hydroelectric storage

    SciTech Connect (OSTI)

    Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

    1984-07-01T23:59:59.000Z

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

  18. Hydroelectric energy | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, search OpenEIHesperia, California:Project JumpHyEnergyHydrocarbonHydroelectric)

  19. Midwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.†

  20. Northwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  1. Pacific Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  2. Nellis AFB 'Sun Park' Photovoltaic Power Project

    Broader source: Energy.gov (indexed) [DOE]

    Briefing is: UNCLASSIFIED Headquarters Air Combat Command Nellis AFB 'Sun Park' Photovoltaic Power Project *Capt Frank Hollifield *AFLOAJACLULT Overview *Objective * Provide...

  3. Northeast Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  4. BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-04-01T23:59:59.000Z

    BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

  5. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  6. TidGen Power System Commercialization Project

    SciTech Connect (OSTI)

    Sauer, Christopher R. [President & CEO] [President & CEO; McEntee, Jarlath [VP Engineering & CTO] [VP Engineering & CTO

    2013-12-30T23:59:59.000Z

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGenģ Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPCís tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGenģ Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGenģ Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

  7. Final Project in Seminar: Electrical Power Network

    E-Print Network [OSTI]

    Lavaei, Javad

    : Different Approaches of Power Systems Security Assessment Uri Livnat MS, Electrical Engineering DepartmentFinal Project in Seminar: Electrical Power Network ELEN 9501, Lectured By Javad Lavaeiyanesi Topic............................................................... 9 #12;Introduction Power systems security is a field which is being explored and researched since

  8. Multi-Project Baselines for Evaluation of Industrial Energy-Efficiency and Electric Power Projects

    E-Print Network [OSTI]

    2001-01-01T23:59:59.000Z

    of Industrial Energy-Efficiency and Electric Power Projectsof Industrial Energy-Efficiency and Electric Power ProjectsOf Industrial Energy-Efficiency And Electric Power Projects

  9. Wave Power Demonstration Project at Reedsport, Oregon

    SciTech Connect (OSTI)

    Mekhiche, Mike [Principal Investigator] [Principal Investigator; Downie, Bruce [Project Manager] [Project Manager

    2013-10-21T23:59:59.000Z

    Ocean wave power can be a significant source of large?scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy? to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high?voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon?based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take?off subsystem are complete; additionally the power take?off subsystem has been successfully integrated into the spar.

  10. Foote Hydroelectric Plant spillway rehabilitation

    SciTech Connect (OSTI)

    Sowers, D.L. [Consumers Power Co., Jackson, MI (United States); Hasan, N.; Gertler, L.R. [Raytheon Infrastructures Services, New York, NY (United States)

    1996-10-01T23:59:59.000Z

    In 1993 the spillway of the 9 MW Foote Hydroelectric Plant located on the AuSable River, near Oscoda, Michigan was rehabilitated. The Foote Plant, built in 1917, is owned and operated by Consumers Power Company. In the 76 years of continuous operation the spillway had deteriorated such that much of the concrete and associated structure needed to be replaced to assure safety of the structure. The hydro station includes an earth embankment with concrete corewall, a concrete spillway with three tainter gates and a log chute, a penstock structure and a steel and masonry powerhouse. The electric generation is by three vertical shaft units of 3,000 KW each. A plan of the plant with spillway and an elevation of the spillway section is shown. This paper describes the evaluation and repair of the plant spillway and associated structure.

  11. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-09-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  12. The NASA CSTI High Capacity Power Project

    SciTech Connect (OSTI)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Titran, R. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Schmitz, P. [Sverdrup Technology, Inc., Brook Park, OH (United States). Lewis Research Center Group; Vandersande, J. [Jet Propulsion Lab., Pasadena, CA (United States)

    1994-09-01T23:59:59.000Z

    The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase I of SP-100 and to strengthen, in key areas, the changes for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the CSTI High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project with develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

  13. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume One, Libby Dam Project, Operator, U.S. Army Corps of Engineers.

    SciTech Connect (OSTI)

    Yde, Chris A.

    1984-10-01T23:59:59.000Z

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Libby Dam project on the Kootenai River and previous mitigation of these losses. The current assessment documents the best available information concerning the impacts to the wildlife populations inhabiting the project area prior to construction of the dam and creation of the reservoir. Many of the impacts reported in this assessment differ from those contained in the earlier document compiled by the Fish and Wildlife Service; however, this document is a thorough compilation of the available data (habitat and wildlife) and, though conservative, attempts to realistically assess the impacts related to the Libby Dam project. Where appropriate the impacts resulting from highway construction and railroad relocation were included in the assessment. This was consistent with the previous assessments.

  14. EIS-0447: Champlain Hudson Power Express Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    47: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluated the...

  15. NREL: Water Power Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: GridTruck Platooning Testing Photo of twoInstrumentation,Projects

  16. Environmental Impacts of Increased Hydroelectric Development...

    Energy Savers [EERE]

    Environmental Impacts of Increased Hydroelectric Development at Existing Dams Environmental Impacts of Increased Hydroelectric Development at Existing Dams This report describes...

  17. GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian Aquatic Ecosystems

    E-Print Network [OSTI]

    Cooke, Steven J.

    GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian with Fisheries and Oceans Canada (6 scientists) and 3 major hydroelectric companies (Nalcor, Manitoba Hydro. Power (U. of Waterloo, m3power@sciborg.uwaterloo.ca) and R. Randall (DFO-Burlington) Effects

  18. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    SciTech Connect (OSTI)

    Douglas G. Hall

    2006-01-01T23:59:59.000Z

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  19. Proceedings of a Topical Meeting On Small Scale Geothermal Power Plants and Geothermal Power Plant Projects

    SciTech Connect (OSTI)

    None

    1986-02-12T23:59:59.000Z

    These proceedings describe the workshop of the Topical Meeting on Small Scale Geothermal Power Plants and Geothermal Power Plant Projects. The projects covered include binary power plants, rotary separator, screw expander power plants, modular wellhead power plants, inflow turbines, and the EPRI hybrid power system. Active projects versus geothermal power projects were described. In addition, a simple approach to estimating effects of fluid deliverability on geothermal power cost is described starting on page 119. (DJE-2005)

  20. THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION

    E-Print Network [OSTI]

    Alaska would alter the seasonal pattern of stream temperatures and pose a threat to the natural (now the Alaska Power Administration) started feasibil- ity studies on a hydroelectric installation of the water from Grace Creek through a hydroelectric plant and back into Grace Creek about 1.2 km from tide

  1. An Approximate Method to Assess the Peaking Capability of the NW Hydroelectric System

    E-Print Network [OSTI]

    DRAFT 1 An Approximate Method to Assess the Peaking Capability of the NW Hydroelectric System September 26, 2005 The best way to assess the hydroelectric system's peaking capability is to simulate its. This is an ominous task and requires the use of sophisticated simulation software. The Bonneville Power

  2. atomic power project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the power harmonics. 1. Angammana Amcj; Seyon K; Tennakoon Smk (miss; Weerasekara Jmca 2 Nuclear Power Plant Design Project Fission and Nuclear Technologies Websites Summary:...

  3. Nellis AFB 'Sun Park' Photovoltaic Power Project | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Nellis AFB 'Sun Park' Photovoltaic Power Project Nellis AFB 'Sun Park' Photovoltaic Power Project Presentation covers the FUPWG Meeting, held on May 1-2, 2007 in Cape Canaveral,...

  4. PowerJet Wind Turbine Project

    SciTech Connect (OSTI)

    Bartlett, Raymond J

    2008-11-30T23:59:59.000Z

    PROJECT OBJECTIVE The PowerJet wind turbine overcomes problems characteristic of the small wind turbines that are on the market today by providing reliable output at a wide range of wind speeds, durability, silent operation at all wind speeds, and bird-safe operation. Prime Energy√ʬ?¬?s objective for this project was to design and integrate a generator with an electrical controller and mechanical controls to maximize the generation of electricity by its wind turbine. The scope of this project was to design, construct and test a mechanical back plate to control rotational speed in high winds, and an electronic controller to maximize power output and to assist the base plate in controlling rotational speed in high winds. The test model will continue to operate beyond the time frame of the project, with the ultimate goal of manufacturing and marketing the PowerJet worldwide. Increased Understanding of Electronic & Mechanical Controls Integrated With Electricity Generator The PowerJet back plate begins to open as wind speed exceeds 13.5 mps. The pressure inside the turbine and the turbine rotational speed are held constant. Once the back plate has fully opened at approximately 29 mps, the controller begins pulsing back to the generator to limit the rotational speed of the turbine. At a wind speed in excess of 29 mps, the controller shorts the generator and brings the turbine to a complete stop. As the wind speed subsides, the controller releases the turbine and it resumes producing electricity. Data collection and instrumentation problems prevented identification of the exact speeds at which these events occur. However, the turbine, controller and generator survived winds in excess of 36 mps, confirming that the two over-speed controls accomplished their purpose. Technical Effectiveness & Economic Feasibility Maximum Electrical Output The output of electricity is maximized by the integration of an electronic controller and mechanical over-speed controls designed and tested during the course of this project. The output exceeds that of the PowerJet√ʬ?¬?s 3-bladed counterparts (see Appendix). Durability All components of the PowerJet turbine assembly√ʬ?¬?including the electronic and mechanical controls designed, manufactured and field tested during the course of this project√ʬ?¬?proved to be durable through severe weather conditions, with constant operation and no interruption in energy production. Low Cost Materials for the turbine, generator, tower, charge controllers and ancillary parts are available at reasonable prices. Fabrication of these parts is also readily available worldwide. The cost of assembling and installing the turbine is reduced because it has fewer parts and requires less labor to manufacture and assemble, making it competitively priced compared with turbines of similar output manufactured in the U.S. and Europe. The electronic controller is the unique part to be included in the turbine package. The controllers can be manufactured in reasonably-sized production runs to keep the cost below $250 each. The data logger and 24 sensors are for research only and will be unnecessary for the commercial product. Benefit To Public The PowerJet wind-electric system is designed for distributed wind generation in 3 and 4 class winds. This wind turbine meets DOE√ʬ?¬?s requirements for a quiet, durable, bird-safe turbine that eventually can be deployed as a grid-connected generator in urban and suburban settings. Results As described more fully below and illustrated in the Appendices, the goals and objectives outlined in 2060 SOPO were fully met. Electronic and mechanical controls were successfully designed, manufactured and integrated with the generator. The turbine, tower, controllers and generators operated without incident throughout the test period, surviving severe winter and summer weather conditions such as extreme temperatures, ice and sustained high winds. The electronic controls were contained in weather-proof electrical boxes and the elec

  5. Potential Climate Change Impacts to the NW Hydroelectric System

    E-Print Network [OSTI]

    Page 1 Potential Climate Change Impacts to the NW Hydroelectric System NW Power and Conservation Council Symposium on Greenhouse Gases June 4, 2013 1 Source of Data ∑ 2009 International Panel on Climate Change (IPCC-4) data but prior to River Management Joint Operating Committee's (RMJOC) processing

  6. Optimization Online - Managing Hydroelectric Reservoirs over an ...

    E-Print Network [OSTI]

    Pierre-Luc Carpentier

    2013-07-07T23:59:59.000Z

    Jul 7, 2013 ... Managing Hydroelectric Reservoirs over an Extended Planning Horizon using a Benders Decomposition Algorithm Exploiting a Memory Loss†...

  7. Power Metering Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon Tue Wed May 28-29,Metering Project Power

  8. Neppel Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns Jump to:Neppel Wind Power Project Jump to: navigation,

  9. ASN Power Projects Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwiki HomeASN Power Projects Ltd Jump to: navigation,

  10. Albeni Falls Wildlife Mitigation Project

    E-Print Network [OSTI]

    from the Albeni Falls Hydroelectric Project #12;Biological Objective 1 Protect 900 acres of wetland hydroelectric project. · 1988 publication of the Final Report Albeni Falls Wildlife Protection, Mitigation effects on wildlife resulting from hydroelectric development. 2. Select target wildlife species

  11. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Roberts, J. O.; Mosey, G.

    2013-02-01T23:59:59.000Z

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  12. Wind for Schools: A Wind Powering America Project (Brochure)

    SciTech Connect (OSTI)

    Baring-Gould, I.

    2009-08-01T23:59:59.000Z

    This brochure provides an overview of Wind Powering America's Wind for Schools Project, including a description of the project, the participants, funding sources, the basic configurations, and how interested parties can become involved.

  13. Wind for Schools: A Wind Powering America Project (Alaska) (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-02-01T23:59:59.000Z

    This brochure provides an overview of Wind Powering America's Wind for Schools Project, including a description of the project, the participants, funding sources, the basic configurations, and how interested parties can become involved.

  14. South Mississippi Electric Power Association Smart Grid Project (Mississippi)

    Broader source: Energy.gov [DOE]

    South Mississippi Electric Power Associationís (SMEPA) smart grid project involves the deployment of advanced metering infrastructure (AMI) and covers the Generation and Transmission (G&T)...

  15. Mid-Atlantic Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  16. EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Riverside County, CA December 10, 2010 EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project December 10, 2010 EIS-0449:...

  17. Wind Power Project Repowering: History, Economics, and Demand...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Power Project Repowering: History, Economics, and Demand Wind Exchange Webinar Eric Lantz January 21, 2015 NRELPR-6A20-63591 2 Presentation Overview 1. Background - Concepts...

  18. Can New Nuclear Power Plants be Project Financed?

    E-Print Network [OSTI]

    Taylor, Simon

    This paper considers the prospects for financing a wave of new nuclear power plants (NPP) using project financing, which is used widely in large capital intensive infrastructure investments, including the power and gas sectors, but has...

  19. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  20. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  1. Vermont Water Quality Certification Application for Hydroelectric...

    Open Energy Info (EERE)

    Vermont Water Quality Certification Application for Hydroelectric Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Vermont Water Quality...

  2. Deep Well #4 Backup Power Systems Project Closeout Report

    SciTech Connect (OSTI)

    Jeremy Westwood

    2010-04-01T23:59:59.000Z

    The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

  3. Guidelines for Power Factor Improvement Projects

    E-Print Network [OSTI]

    Massey, G. W.

    Power factor is an indication of electrical system efficiency. Low power factor, or low system efficiency, may be due to one or more causes, including lightly loaded transformers, oversized electric motors, and harmonic-generating non-linear loads...

  4. Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...

    Energy Savers [EERE]

    Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program...

  5. Control of a Hydraulically-Powered, Differential Lift Project Proposal

    E-Print Network [OSTI]

    Control of a Hydraulically-Powered, Differential Lift Project Proposal Written by Thomas Johnson ME6401: Linear Control Submitted to Dr. Wayne Book 9/11/06 #12;A hydraulically-powered, differential lift representation of a differential lift can be viewed in Figure 1. Figure 1. Hydraulically-powered, differential

  6. Ocean Renewable Power Co (ORPC) (TRL 7 8 System)- TidGen (TM) Power System Commercialization Project

    Broader source: Energy.gov [DOE]

    Ocean Renewable Power Co (ORPC) (TRL 7 8 System) - TidGen (TM) Power System Commercialization Project

  7. Effects of Climate Change on the Hydroelectric The Council is not tasked, nor does it have the resources to resolve existing uncertainties

    E-Print Network [OSTI]

    at hydroelectric dams when Northwest demands and power market values are likely to grow due to higher airEffects of Climate Change on the Hydroelectric System SUMMARY The Council is not tasked, nor does impacts of climate change to the power system and to recommend mitigating actions whenever possible. While

  8. Salt Lake City Area Integrated Projects Power Sales Rate History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Salt Lake City Area Integrated Projects Power Sales Rate History Updated: 9112013 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) 1...

  9. EA-1784: Fotowatio Nevada Solar, LLC's Apex Solar Power Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, NV July 1, 2010 DOI-BLM-NV-S010-2010-0149-EA: Bureau of Land Management's Final Environmental Assessment Fotowatio Nevada Solar, LLC's APEX Solar Power Project in Clark...

  10. QER- Comment of Oceti Sakowin Sioux Wind Power Project

    Broader source: Energy.gov [DOE]

    Dear Secretariat: Attached please find the Comments of the Oceti Sakowin Sioux Wind Power Project, for inclusion in the record of the QER. If any questions, please direct to the undersigned.

  11. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul; 740, 293 Highway; Baden, NC 28009

    2013-02-28T23:59:59.000Z

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  12. 2008 Wind Energy Projects, Wind Powering America (Poster)

    SciTech Connect (OSTI)

    Not Available

    2009-01-01T23:59:59.000Z

    The Wind Powering America program produces a poster at the end of every calendar year that depicts new U.S. wind energy projects. The 2008 poster includes the following projects: Stetson Wind Farm in Maine; Dutch Hill Wind Farm in New York; Grand Ridge Wind Energy Center in Illinois; Hooper Bay, Alaska; Forestburg, South Dakota; Elbow Creek Wind Project in Texas; Glacier Wind Farm in Montana; Wray, Colorado; Smoky Hills Wind Farm in Kansas; Forbes Park Wind Project in Massachusetts; Spanish Fork, Utah; Goodland Wind Farm in Indiana; and the Tatanka Wind Energy Project on the border of North Dakota and South Dakota.

  13. EIS-0215: Pinon Pine Power Project, Tracy Station, NV

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) prepared this statement to assess the environmental and human health issues associated with the Pinon Pine Power Project, a proposed demonstration project that would be cost-shared by DOE and the Sierra Pacific Power Company (SPPCo.) under DOE's Clean Coal Technology Program. The proposed Federal action is for DOE to provide cost-shared funding support for the construction and operation of the Pinon Pine Power Project, a coal-fired power generating facility, which would be a nominal, 800-ton-per-day (104 megawatt (MW) gross generation) air-blown, Integrated Gasification Combined-Cycle plant proposed by SPPCo. at its Tracy Power Station near Reno, Nevada.

  14. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect (OSTI)

    NONE

    1994-11-01T23:59:59.000Z

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  15. Puerto Rico`s EcoElectrica LNG/power project marks a project financing first

    SciTech Connect (OSTI)

    Lammers, R. [Enron International, Houston, TX (United States); Taylor, S. [Kenetech Energy Systems Inc., Houston, TX (United States)

    1998-02-23T23:59:59.000Z

    On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a number of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.

  16. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect (OSTI)

    NONE

    1995-01-01T23:59:59.000Z

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  17. Hydroelectric Resources on State Lands (Montana)

    Broader source: Energy.gov [DOE]

    This chapter authorizes the leasing of state lands for the development of hydroelectric resources. It provides regulations for the granting and duration of leases, as well as for the inspection of...

  18. NREL: Concentrating Solar Power Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Saleshttp://www.fnal.gov/directorate/nalcal/nalcal02_07_05_files/nalcal.gifNREL NRELChemical andWhat IsThermal EnergyNewsProjects

  19. Power Project Loan Fund | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA Administrative Judgea.WorkEconomicPOWER ELECTRONICS AND

  20. Shiloh Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‚Äé |Rippey JumpAirPower Partners WindSherbino 2ShikunIII

  1. Moraine Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose BendMiasole IncMinutemanVistaZephyr) Jump to: navigation,Wind Power

  2. Power Metering Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in235-1Department of60 DATE:AnnualDepartmentEnergyFunded byPower

  3. Fenner Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 NoEurope BV JumpFederal Highway AdministrationFellowsWind Power

  4. 2025 Power Marketing Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the LAP FES contracts and has developed a plan for marketing and allocating LAP hydroelectric power after the current FES contracts expire. We call this plan our 2025...

  5. Municipal Electric Power (Minnesota)

    Broader source: Energy.gov [DOE]

    This section describes energy procurement for local utilities operating in Minnesota and provides a means for Minnesota cities to construct and operate hydroelectric power plants. The statute gives...

  6. Multi-Project Baselines for Evaluation of Industrial Energy-Efficiency and Electric Power Projects

    E-Print Network [OSTI]

    2001-01-01T23:59:59.000Z

    and wind to meet the off grid supply. The future expansionagency for decentralized off-grid supply of power of 6 MW ofProject 5 is based on Off-grid Solar Home Systems. The aim

  7. Multiproject baselines for evaluation of electric power projects

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12T23:59:59.000Z

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  8. Alum Innovative Exploration Project (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    Data generated from the Alum Innovative Exploration Project, one of several promising geothermal properties located in the middle to upper Miocene (~11-5 Ma, or million years BP) Silver Peak-Lone Mountain metamorphic core complex (SPCC) of the Walker Lane structural belt in Esmeralda County, west-central Nevada. The geothermal system at Alum is wholly concealed; its upper reaches discovered in the late 1970s during a regional thermal-gradient drilling campaign. The prospect boasts several shallow thermal-gradient (TG) boreholes with TG >75oC/km (and as high as 440oC/km) over 200-m intervals in the depth range 0-600 m. Possibly boiling water encountered at 239 m depth in one of these boreholes returned chemical- geothermometry values in the range 150-230oC. GeothermEx (2008) has estimated the electrical- generation capacity of the current Alum leasehold at 33 megawatts for 20 years; and the corresponding value for the broader thermal anomaly extending beyond the property at 73 megawatts for the same duration.

  9. Five-megawatt geothermal-power pilot-plant project

    SciTech Connect (OSTI)

    Not Available

    1980-08-29T23:59:59.000Z

    This is a report on the Raft River Geothermal-Power Pilot-Plant Project (Geothermal Plant), located near Malta, Idaho; the review took place between July 20 and July 27, 1979. The Geothermal Plant is part of the Department of Energy's (DOE) overall effort to help commercialize the operation of electric power plants using geothermal energy sources. Numerous reasons were found to commend management for its achievements on the project. Some of these are highlighted, including: (a) a well-qualified and professional management team; (b) effective cost control, performance, and project scheduling; and (c) an effective and efficient quality-assurance program. Problem areas delineated, along with recommendations for solution, include: (1) project planning; (2) facility design; (3) facility construction costs; (4) geothermal resource; (5) drilling program; (6) two facility construction safety hazards; and (7) health and safety program. Appendices include comments from the Assistant Secretary for Resource Applications, the Controller, and the Acting Deputy Director, Procurement and Contracts Management.

  10. Wind Powering America's Wind for Schools Project: Summary Report

    SciTech Connect (OSTI)

    Baring-Gould, I.; Newcomb, C.

    2012-06-01T23:59:59.000Z

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  11. Public choice in water resource management: two case studies of the small-scale hydroelectric controversy

    SciTech Connect (OSTI)

    Soden, D.L.

    1985-01-01T23:59:59.000Z

    Hydroelectric issues have a long history in the Pacific Northwest, and more recently have come to focus on developing environmentally less-obtrusive means of hydroelectric generation. Small-scale hydroelectric represents perhaps the most important of these means of developing new sources of renewable resources to lessen the nation's dependence on foreign sources of energy. Each potential small-scale hydroelectric project, however, manifests a unique history which provides a highly useful opportunity to study the process of collective social choice in the area of new energy uses of water resources. Utilizing the basic concepts of public choice theory, a highly developed and increasingly widely accepted approach in the social sciences, the politicalization of small-scale hydroelectric proposals is analyzed. Through the use of secondary analysis of archival public opinion data collected from residents of the State of Idaho, and through the development of the two case studies - one on the Palouse River in Eastern Washington and the other at Elk Creek Falls in Northern Idaho, the policy relevant behavior and influence of major actors is assessed. Results provide a useful test of the utility of public-choice theory for the study of cases of natural-resources development when public involvement is high.

  12. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect (OSTI)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31T23:59:59.000Z

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEAís wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  13. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    SciTech Connect (OSTI)

    Lantz, E.

    2015-01-01T23:59:59.000Z

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  14. Project Sponsors: California Air Resources Board ADVANCED POWER & ENERGY

    E-Print Network [OSTI]

    Mease, Kenneth D.

    Emissions Flow chart of STREET modeling methodology Impacts of Plug-In Hybrid Vehicles and Grid GenerationProject Sponsors: California Air Resources Board Toyota ADVANCED POWER & ENERGY PROGRAM www renewable wind energy penetrations and PHEV penetrations. The outcome of each scenario consists of spatially

  15. Fast Verification of Wind Turbine Power Summary of Project Results

    E-Print Network [OSTI]

    Fast Verification of Wind Turbine Power Curves: Summary of Project Results by: Cameron Brown ¬≠ s equation on high frequency wind turbine measurement data sampled at one sample per second or more. The aim's Nordtank wind turbine at the Ris√ł site, the practical application of this new method was tested

  16. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect (OSTI)

    Sinclair, Mark; Margolis, Anne

    2012-02-01T23:59:59.000Z

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  17. STATEMENT OF CONSIDERATIONS REQUEST BY SIEMENS WESTINGHOUSE POWER...

    Broader source: Energy.gov (indexed) [DOE]

    the global power plant market. All other forms of generating electrical power, such as steam turbine technology, nuclear power, hydroelectric and wind facilities, represent...

  18. State of structures of the Kolyma hydroelectric station according to data of on-site observations

    SciTech Connect (OSTI)

    Kuznetsov, V.S.; Voinovich, A.P.; Matroshilina, T.V.; Krupin, V.A.; Bulatov, S.N.

    1995-10-01T23:59:59.000Z

    On-site inspections of the Kolyma hydroelectric power station have been performed since 1979. A large quantity of data has been obtained pertaining to the dam, underground powerhouse, and other structures. Over 2000 measuring instruments were installed for checking the structures and foundations.

  19. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    SciTech Connect (OSTI)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31T23:59:59.000Z

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.

  20. Concentrated Thermoelectric Power

    Broader source: Energy.gov [DOE]

    This fact sheet describes a concentrated solar hydroelectric power project awarded under the DOE's 2012 SunShot Concentrating Solar Power R&D award program. The team, led by MIT, is working to demonstrate concentrating solar thermoelectric generators with >10% solar-to-electrical energy conversion efficiency while limiting optical concentration to less than a factor of 10 and potentially less than 4. When combined with thermal storage, CSTEGs have the potential to provide electricity day and night using no moving parts at both the utility and distributed scale.

  1. High power RF systems for the BNL ERL project

    SciTech Connect (OSTI)

    Zaltsman, A.; Lambiase, R.

    2011-03-28T23:59:59.000Z

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  2. Hydroelectric Reservoirs -the Carbon Dioxide and Methane

    E-Print Network [OSTI]

    Fischlin, Andreas

    and contribute to global warming. The problem of greenhouse gases and their impact on global warming have become gas source. #12;1 1. Introduction The electricity produced by hydroelectric reservoirs is commonly greenhouse gases. One good point to know by dealing with these two greenhouse gases is that the global

  3. Riding the Clean Energy Wave: New Projects Aim to Improve Water Power Devices

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department announces two projects as part of a larger effort to deploy innovative technologies for clean, domestic power generation from water power resources.

  4. Ris-R-1380(EN) Wind Power Projects in the CDM

    E-Print Network [OSTI]

    RisÝ-R-1380(EN) Wind Power Projects in the CDM: Methodologies and Tools for Baselines, Carbon, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends

  5. Analysis of recent projections of electric power demand

    SciTech Connect (OSTI)

    Hudson, D.V. Jr.

    1993-08-01T23:59:59.000Z

    This report reviews the changes and potential changes in the outlook for electric power demand since the publication of Review and Analysis of Electricity Supply Market Projections (B. Swezey, SERI/MR-360-3322, National Renewable Energy Laboratory). Forecasts of the following organizations were reviewed: DOE/Energy Information Administration, DOE/Policy Office, DRI/McGraw-Hill, North American Electric Reliability Council, and Gas Research Institute. Supply uncertainty was briefly reviewed to place the uncertainties of the demand outlook in perspective. Also discussed were opportunities for modular technologies, such as renewable energy technologies, to fill a potential gap in energy demand and supply.

  6. Kenya geothermal private power project: A prefeasibility study

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  7. Northwest Power and Conservation Council Protected Areas Designations, Fish and Wildlife Program

    E-Print Network [OSTI]

    of capacity from this study that falls into the protected areas designations, the Northwest Hydroelectric run-of-the-river hydroelectric projects may not be able to be developed within a protected areas

  8. Small Hydroelectric | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‚Äé |RippeyInformation SlimSlough Heat and Power

  9. Thermal Energy Corporation Combined Heat and Power Project

    SciTech Connect (OSTI)

    E. Bruce Turner; Tim Brown; Ed Mardiat

    2011-12-31T23:59:59.000Z

    To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation‚??s best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission ‚?? providing top quality medical care and instruction ‚?? without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO‚??s operation is the largest Chilled Water District Energy System in the United States. The company used DOE‚??s funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC‚??s growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation‚??s healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

  10. Potential Presence of Endangered Wildlife Species at the University of Delaware Wind Power Project Site

    E-Print Network [OSTI]

    Firestone, Jeremy

    Potential Presence of Endangered Wildlife Species at the University of Delaware Wind Power Project wind power project site, we conducted an analysis of the suitability of habitat within the project of potential risk to the species. #12;Corn Snake ­ Fairly common in Delaware, but is not likely to be present

  11. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    E-Print Network [OSTI]

    Widyolar, Bennett

    2013-01-01T23:59:59.000Z

    is the fraction of available solar power incident on theoutput per available solar power and characterizes theintegral of available solar power over the operational time

  12. MHK Projects/Willapa Bay Tidal Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose Bend < MHK Projects Jump to:Vicksburg BendWillapa Bay Tidal Power

  13. The intermountain power project commissioning - Subsynchronous torsional interaction tests

    SciTech Connect (OSTI)

    Wu, C.T.; Peterson, K.J. (Dept. of Water and Power, Los Angeles, CA (US)); Pinko, R.J.; Kankam, M.D.; Baker, D.H. (General Electric Co., Schenectady, NY (US))

    1988-10-01T23:59:59.000Z

    Subsyncronous torsional vibration as a result of electrochemical interaction between the HVDC controls and a turbine-generator was first discovered during the commissioning of the Square Butte Project in 1977. The level of interaction between the HVDC controls and the turbine-generator depends on several interacting factors: the characteristic torsional frequencies of the turbine-generator, the bandwidth of the HVDC controls and the relative strength of the connecting ac system. For the Intermountain Power Project (IPP), early analysis of these interacting factors indicated that there exist definite potential for subsynchronous oscillation to occur. The calculated torsional frequencies of the IPP units showed that the first mode frequency is 14.0 Hz and is within the typical bandwidth of an HVDC control which is between 10-20 Hz. The HVDC controls, therefore, can influence the torsional stability of the IPP units. Further, the IPP turbine-generators are required to operate isolated on the HVDC rectifier terminal, with no other interconnecting ac network. This ''radial'' mode of operation will result in maximum interaction between the converter station and the IPP units. It became obvious that special measure must be implemented in the design of the IPP HVDC control system to modify its typical characteristics to avoid the occurrence of the subsynchronous oscillation. This paper presents the results of the subsynchronous torsional interaction (SSTI) tests that were performed during the commissioning of the IPP Unit 1 and the HVDC Transmission system.

  14. Compiling Utility Requirements For New Nuclear Power Plant Project

    SciTech Connect (OSTI)

    Patrakka, Eero [Teollisuuden Voima Oy, 27160 Olkiluoto (Finland)

    2002-07-01T23:59:59.000Z

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  15. Marine Hydroelectric Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose Bend < MHKconvertersourcesource HistoryMarianiHydroelectric

  16. Pleasant Prairie Power Plant air quality control upgrade project, Pleasant Praire, Wisconsin

    SciTech Connect (OSTI)

    Gebhart, S.; Pennline, D.; Brodsky, I.; Bichler, D. [Washington Group International (United States)

    2007-10-15T23:59:59.000Z

    We Energies recently completed a multiyear project at its Pleasant Prairie Power Plant to add a selective catalytic reduction system to one of its two units and a scrubber to both. These projects are described. 7 figs., 1 tab.

  17. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2012-01-01T23:59:59.000Z

    with installed wind project costs in both 2008 and 2009, asfor installed wind power project costs in 2009. For example,to the estimated cost of other wind power projects built in

  18. Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series

    Wind Powering America (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment Activities Printable80 mPilot ProjectWind Powering

  19. Microsoft PowerPoint - States Project Map.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure (Regional Carbon Sequestration Partnership) Projects Locations of Performing Organizations *Project location may be different than location of Primary Performer 1 05...

  20. EA-1801: Granite Reliable Power Wind Park Project in Coos County...

    Broader source: Energy.gov (indexed) [DOE]

    June 25, 2010 EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire July 23, 2010 EA-1801: Finding of No Significant Impact Granite...

  1. Risks and decision making in development of new power plant projects

    E-Print Network [OSTI]

    Kristinsdottir, Asbjorg

    2012-01-01T23:59:59.000Z

    Power plant development projects are typically capital intensive and subject to a complex network of interconnected risks that impact development's performance. Failure to develop a power plant to meet performance constraints ...

  2. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  3. Evaluation of Advanced Wind Power Forecasting Models Results of the Anemos Project

    E-Print Network [OSTI]

    Paris-Sud XI, Universitť de

    1 Evaluation of Advanced Wind Power Forecasting Models ≠ Results of the Anemos Project I. MartŪ1.kariniotakis@ensmp.fr Abstract An outstanding question posed today by end-users like power system operators, wind power producers or traders is what performance can be expected by state-of-the-art wind power prediction models. This paper

  4. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    E-Print Network [OSTI]

    Widyolar, Bennett

    2013-01-01T23:59:59.000Z

    solar powered cooling system by producing a seamless output of cooling powersolar COP is the ratio of cooling output per available solar power

  5. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-12-01T23:59:59.000Z

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  6. Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project

    SciTech Connect (OSTI)

    O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.; Conway, T. J.; Vanderhorst, Jr, T. J.; Januszewski, III, J.; leo, R.; Perman, K.

    2013-08-26T23:59:59.000Z

    This is the final report of Phase 2 of the Secure Power Systems Professional project, a 3 phase project. DOE will post to their website upon release.

  7. agri power project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy projects, including wind, closed- and open-loop biomass, geothermal, Bolinger, Mark 2009-01-01 117 The Jubilee ISW Project I: simulated ISW and weak lensing maps and...

  8. Power System Operator

    Broader source: Energy.gov [DOE]

    At Southeastern, you can make a direct impact by helping us deliver low-cost hydroelectric power to over one hundred electric cooperatives and municipal utilities, and over eight million end-use...

  9. Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.

    SciTech Connect (OSTI)

    US Bonneville Power Administration

    1993-11-01T23:59:59.000Z

    This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

  10. Silver Peak Innovative Exploration Project (Ram Power Inc.)

    SciTech Connect (OSTI)

    Miller, Clay

    2010-01-01T23:59:59.000Z

    Data generated from the Silver Peak Innovative Exploration Project, in Esmeralda County, Nevada, encompasses a ďdeep-circulation (amagmatic)Ē meteoric-geothermal system circulating beneath basin-fill sediments locally blanketed with travertine in western Clayton Valley (lithium-rich brines from which have been mined for several decades). Spring- and shallow-borehole thermal-water geochemistry and geothermometry suggest that a Silver Peak geothermal reservoir is very likely to attain the temperature range 260- 300oF (~125-150oC), and may reach 300-340oF (~150-170oC) or higher (GeothermEx, Inc., 2006). Results of detailed geologic mapping, structural analysis, and conceptual modeling of the prospect (1) support the GeothermEx (op. cit.) assertion that the Silver Peak prospect has good potential for geothermal-power production; and (2) provide a theoretical geologic framework for further exploration and development of the resource. The Silver Peak prospect is situated in the transtensional (regional shearing coupled with extension) Walker Lane structural belt, and squarely within the late Miocene to Pliocene (11 Ma to ~5 Ma) Silver Peak-Lone Mountain metamorphic core complex (SPCC), a feature that accommodated initial displacement transfer between major right-lateral strike- slip fault zones on opposite sides of the Walker Lane. The SPCC consists essentially of a ductiley-deformed lower plate, or ďcore,Ē of Proterozoic metamorphic tectonites and tectonized Mesozoic granitoids separated by a regionally extensive, low-angle detachment fault from an upper plate of severely stretched and fractured structural slices of brittle, Proterozoic to Miocene-age lithologies. From a geothermal perspective, the detachment fault itself and some of the upper-plate structural sheets could function as important, if secondary, subhorizontal thermal-fluid aquifers in a Silver Peak hydrothermal system.

  11. Silver Peak Innovative Exploration Project (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    Data generated from the Silver Peak Innovative Exploration Project, in Esmeralda County, Nevada, encompasses a ďdeep-circulation (amagmatic)Ē meteoric-geothermal system circulating beneath basin-fill sediments locally blanketed with travertine in western Clayton Valley (lithium-rich brines from which have been mined for several decades). Spring- and shallow-borehole thermal-water geochemistry and geothermometry suggest that a Silver Peak geothermal reservoir is very likely to attain the temperature range 260- 300oF (~125-150oC), and may reach 300-340oF (~150-170oC) or higher (GeothermEx, Inc., 2006). Results of detailed geologic mapping, structural analysis, and conceptual modeling of the prospect (1) support the GeothermEx (op. cit.) assertion that the Silver Peak prospect has good potential for geothermal-power production; and (2) provide a theoretical geologic framework for further exploration and development of the resource. The Silver Peak prospect is situated in the transtensional (regional shearing coupled with extension) Walker Lane structural belt, and squarely within the late Miocene to Pliocene (11 Ma to ~5 Ma) Silver Peak-Lone Mountain metamorphic core complex (SPCC), a feature that accommodated initial displacement transfer between major right-lateral strike- slip fault zones on opposite sides of the Walker Lane. The SPCC consists essentially of a ductiley-deformed lower plate, or ďcore,Ē of Proterozoic metamorphic tectonites and tectonized Mesozoic granitoids separated by a regionally extensive, low-angle detachment fault from an upper plate of severely stretched and fractured structural slices of brittle, Proterozoic to Miocene-age lithologies. From a geothermal perspective, the detachment fault itself and some of the upper-plate structural sheets could function as important, if secondary, subhorizontal thermal-fluid aquifers in a Silver Peak hydrothermal system.

  12. Distributed Power Generation: Requirements and Recommendations for an ICT Architecture

    E-Print Network [OSTI]

    Appelrath, Hans-JŁrgen

    . In the future of energy markets, the distributed energy production through wind and hydroelectric power plants. Some of these are sustainable (wind and hydroelectric power plants, solar cells), some are controllable, one has to distinguish between two in principle different products: consumption power and balance

  13. $60 Million to Fund Projects Advancing Concentrating Solar Power

    Broader source: Energy.gov [DOE]

    The SunShot initiative announces a $60 million funding opportunity (FOA) to advance concentrating solar power in the United States.

  14. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    E-Print Network [OSTI]

    Widyolar, Bennett

    2013-01-01T23:59:59.000Z

    High-temperature, Solar Collectors for Mass Production.by tracking type solar collectors and the power productionvi List of Symbols solar collector inlet aperture area (m

  15. MEDIUM POWER 352 MHZ SOLID STATE PULSED RF AMPLIFIERS FOR THE CERN LINAC4 PROJECT

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    MEDIUM POWER 352 MHZ SOLID STATE PULSED RF AMPLIFIERS FOR THE CERN LINAC4 PROJECT J. Broere, J in the CERN Linac4. The amplifiers are water-cooled and can provide up to 33 kW pulsed RF Power, 1.5 ms pulse RF Power for the debuncher cavity. The concept is based on 1.2 kW RF power modules using the latest 6

  16. EIS-0294: Sutter Power Project, Sutter County, California

    Broader source: Energy.gov [DOE]

    This EIS analyzes Western Area Power Administration's (Western) decision to support Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kilovolt (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP).

  17. Third Party Financing and Power Purchasing Agreements for Public Sector PV Projects

    Broader source: Energy.gov [DOE]

    Provides information on third-party financing and Power Purchase Agreements for public sector PV projects presented at the TAP Web Seminar on May 27, 2009, includes economic and legal information.

  18. Projects Selected to Advance Innovative Materials for Fossil Energy Power Systems

    Broader source: Energy.gov [DOE]

    Four projects that will develop capabilities for designing sophisticated materials that can withstand the harsh environments of advanced fossil energy power systems have been selected by the U.S. Department of Energy.

  19. Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi

    E-Print Network [OSTI]

    Johnson, Eric E.

    environment for El Salvador ∑ Create partnerships with leading U.S. solar industry companies ∑ SelectTitle: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating

  20. EIS-0377: Big Stone II Power Plant and Transmission Project

    Broader source: Energy.gov [DOE]

    A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission...

  1. Technology status and project development risks of advanced coal power generation technologies in APEC developing economies

    SciTech Connect (OSTI)

    Lusica, N.; Xie, T.; Lu, T.

    2008-10-15T23:59:59.000Z

    The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

  2. Reactive Power Compensation Based on FACTs Devices Xunchi Wu (xw2256) Power Systems Analysis Final Project

    E-Print Network [OSTI]

    Lavaei, Javad

    ..........................................................................................5 2.1 The Thyristor Controlled Reactor (TCR)......................................................................8 III. Power Flow Calculation

  3. Project Sponsors: California Energy CommissionADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    The Renewable Energy Secure Community (RESCO) project is a program sponsored by the California Energy Commission to Renewable Energy Security RESULTS (continued) Further, an energy resource allocation and dispatch model hasProject Sponsors: California Energy CommissionADVANCED POWER & ENERGY PROGRAM www

  4. Pinon Pine Power Project. Annual report, January 1--December 31, 1996

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.

  5. Project Sponsors:ADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    costs for plug-in electric vehicles. J. of Power Sources, Vol. 240, No. 0, pp. 515-524. OVERVIEW PlugProject Sponsors:ADVANCED POWER & ENERGY PROGRAM www.apep.uci.edu GOALS Evaluate the impact of realistic charging infrastructure options on real travel behavior in order to delineate PEV operating cost

  6. On-Site Renewable Power Purchase Agreements for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    An on-site renewable power purchase agreement (PPA) enables Federal agencies to fund a renewable energy project by contracting to purchase the power generated by the system. The renewable energy equipment is installed and owned by a developer but located on-site at the agency facility.

  7. | | | | |Monday, July 16, 2012 Three Northeast Ohio offshore wind power projects

    E-Print Network [OSTI]

    Rollins, Andrew M.

    | | | | |Monday, July 16, 2012 Home Three Northeast Ohio offshore wind power projects secure federal money By SCOTT SUTTELL 1:52 pm, September 9, 2011 Three Northeast Ohio offshore wind power to "speed technical innovations, lower costs, and shorten the timeline for deploying offshore wind energy

  8. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    Open Energy Info (EERE)

    ExemptionsPermittingRegulatory GuidanceGuideHandbook Author FERC Published FERC, 042001 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link...

  9. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    Open Energy Info (EERE)

    GuidanceGuideHandbook Abstract This handbook outlines the requirements for hydropower licenses issued by the Federal Energy Regulatory Commission. Author Federal Energy...

  10. FERC Hydroelectric Project Handbook for Filings other than Licenses and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazelPennsylvania: EnergyExolis Energy JumpFAC 04-08 Jump to:FC3Exemptions |

  11. PSNH's Northern Wood power project repowers coal-fired plant with new fluidized-bed combustor

    SciTech Connect (OSTI)

    Peltier, R.

    2007-08-15T23:59:59.000Z

    The Northern Wood Power project permanently replaced a 50-MW coal-burning boiler (Unit 5) at Public Service of New Hampshire's Schiller station with a state-of-the-art circulating fluidized bed wood-burning boiler of the same capacity. The project, completed in December 2006, reduced emissions and expanded the local market for low-grade wood. For planning and executing the multiyear, $75 million project at no cost to its ratepayers, PSNH wins Power's 2007 Marmaduke Award for excellence in O & M. The award is named for Marmaduke Surfaceblow, the fictional marine engineer/plant troubleshoot par excellence. 7 figs., 1 tab.

  12. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase I, Volume Two (A), Clark Fork Projects, Thompson Falls Dam, Operator, Montana Power Company.

    SciTech Connect (OSTI)

    Wood, Marilyn

    1984-03-27T23:59:59.000Z

    The Thompson Falls Dam inundated approximately 347 acres of wildlife habitat that likely included conifer forests, deciduous bottoms, mixed conifer-deciduous forests and grassland/hay meadows. Additionally, at least one island, and several gravel bars were inundated when the river was transformed into a reservoir. The loss of riparian and riverine habitat adversely affected the diverse wildlife community inhabiting the lower Clark Fork River area. Quantitative loss estimates were determined for selected target species based on best available information. The loss estimates were based on inundation of the habitat capable of supporting the target species. Whenever possible, loss estimates bounds were developed by determining ranges of impacts based on density estimates and/or acreage loss estimates. Of the twelve target species or species groups, nine were assessed as having net negative impacts. 86 refs., 2 figs., 5 tabs.

  13. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    SciTech Connect (OSTI)

    Not Available

    1981-09-15T23:59:59.000Z

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations.

  14. Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations to the Bonneville Power Administration

    E-Print Network [OSTI]

    to the Bonneville Power Administration for Fiscal Years 2007 through 2009 October 2006 Programmatic Issues-based obligations into the broader Northwest Power Act program -- it is precisely the fact that Bonneville has to Bonneville that satisfy Bonneville's ESA-based objectives balanced with its broader Northwest Power Act

  15. Solid Oxide Fuel Cell Technology Stationary Power Application Project

    SciTech Connect (OSTI)

    Joseph Pierre

    2009-03-05T23:59:59.000Z

    The objectives of this program were to: (1) Develop a reliable, cost-effective, and production-friendly technique to apply the power-enhancing layer at the interface of the air electrode and electrolyte of the Siemens SOFC; (2) Design, build, install, and operate in the field two 5 kWe SOFC systems fabricated with the state-of-the-art cylindrical, tubular cell and bundle technology and incorporating advanced module design features. Siemens successfully demonstrated, first in a number of single cell tests and subsequently in a 48-cell bundle test, a significant power enhancement by employing a power-enhancing composite interlayer at the interface between the air electrode and electrolyte. While successful from a cell power enhancement perspective, the interlayer application process was not suitable for mass manufacturing. The application process was of inconsistent quality, labor intensive, and did not have an acceptable yield. This program evaluated the technical feasibility of four interlayer application techniques. The candidate techniques were selected based on their potential to achieve the technical requirements of the interlayer, to minimize costs (both labor and material), and suitably for large-scale manufacturing. Preliminary screening, utilizing lessons learned in manufacturing tubular cells, narrowed the candidate processes to two, ink-roller coating (IRC) and dip coating (DC). Prototype fixtures were successfully built and utilized to further evaluate the two candidate processes for applying the interlayer to the high power density Delta8 cell geometry. The electrical performance of interlayer cells manufactured via the candidate processes was validated. Dip coating was eventually selected as the application technique of choice for applying the interlayer to the high power Delta8 cell. The technical readiness of the DC process and product quality was successfully and repeatedly demonstrated, and its throughput and cost are amenable to large scale manufacturing. Two 5 kWe-class SOFC power systems were built and installed for the purpose of testing and evaluating state-of-the-art tubular cell and bundle technologies, advanced generator and module design features, balance-of-plant components, and cost reduction measures. Installed at the Phipps Conservatory and Botanical Gardens, a system operated for more than 17,500 hrs, delivering electrical power to the on-site grid and thermal energy in form of hot water for onsite utilization. Operation was typically autonomous, requiring minimal operator intervention, and achieved an overall availability of greater than 85%. Outages were primarily due to an unstable local grid, two weather related outages were experienced, and very few reliability issues were encountered despite harsh operating conditions. No repairs to the stack, module, or balance-of-plant were required. A second system was designed, built, delivered, and installed at a Siemens facility in Charlotte, North Carolina. Operational issues associated with the balance-of-plant were encountered during startup and prevented the system from operating.

  16. Nuclear power industry in the United States: status and projections

    SciTech Connect (OSTI)

    Connolly, T.J.

    1988-01-01T23:59:59.000Z

    One sixth of the electricity in the United States is now being generated in nuclear power plants, a remarkable achievement for a technology whose basic nuclear reaction was not even known 50 years ago. On the other hand, many of the nation's electric utilities are experiencing great difficulties completing the construction of their nuclear plants; 41 partially constructed plants have been abandoned. Those abandoned plants plus about 110 in operation and 15 still to be completed comprise the first generation of nuclear power plants in the United States. When, and even if, there will be a second generation is much in doubt. Data are presented to show that the absence of a second generation of nuclear plants will place large demands on the fossil fuels, with attendant high energy prices and high environmental costs the expected outcome. It appears that the future will bring large economic forces to start new orders for nuclear plants. On the other hand, the opposing institutional forces appear equally strong. Among the problems creating these institutional forces are the difficulty the United States is having in finding a politically acceptable approach to nuclear waste disposal and the vulnerability of power plant builders and operators to litigation and high financial risk. At present, the issue of a second generation of nuclear plants is stalemated. 17 references.

  17. Project Profile: The Sacramento Municipal Utility District Consumnes Power Plant Solar Augmentation Project

    Broader source: Energy.gov [DOE]

    The Sacramento Municipal Utility District (SMUD), under the Concentrating Solar Power (CSP) Heat Integration for Baseload Renewable Energy Development (HIBRED) program, is demonstrating a hybrid CSP solar energy system that takes advantage of an existing electrical generator for its power block and transmission interconnection.

  18. Federal Register Notice EPAct 2005 Section 242 Hydroelectric Incentive Program: January 2015

    Broader source: Energy.gov [DOE]

    Federal Register Notice for the EPAct 2005 Section 242 Hydroelectric Incentive Program application period announcement: January, 2015.

  19. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    80% of BPA's total firm power supply is carbon emission-free hydroelectric power * BPA's grid provides about 75% of the bulk transmission capacity in the Region Bonneville Power...

  20. Project Profile: Advanced Nitrate Salt Central Receiver Power Plant |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProjectDepartment of Energy

  1. Cleco Power LLC Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin UrbanCity ofCityClean EconomyLLC Smart Grid Project Jump to:

  2. Projects To Develop Novel Monitoring Networks for Advanced Power Systems

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartmentGasInformationPrimusProgramProject Mgt || DepartmentSelected |

  3. COE projection for the modular WARP{trademark} wind power system for wind farms and electric utility power transmission

    SciTech Connect (OSTI)

    Weisbrich, A.L. [ENECO, West Simsbury, CT (United States); Ostrow, S.L.; Padalino, J. [Raytheon Engineers and Constructors, New York, NY (United States)

    1995-09-01T23:59:59.000Z

    Wind power has emerged as an attractive alternative source of electricity for utilities. Turbine operating experience from wind farms has provided corroborating data of wind power potential for electric utility application. Now, a patented modular wind power technology, the Toroidal Accelerator Rotor Platform (TARP{trademark}) Windframe{trademark}, forms the basis for next generation megawatt scale wind farm and/or distributed wind power plants. When arranged in tall vertically clustered TARP{trademark} module stacks, such power plant units are designated Wind Amplified Rotor Platform (WARP{trademark}) Systems. While heavily building on proven technology, these systems are projected to surpass current technology windmills in terms of performance, user-friendly operation and ease of maintenance. In its unique generation and transmission configuration, the WARP{trademark}-GT System combines both electricity generation through wind energy conversion and electric power transmission. Furthermore, environmental benefits include dramatically less land requirement, architectural appearance, lower noise and EMI/TV interference, and virtual elimination of bird mortality potential. Cost-of-energy (COE) is projected to be from under $0.02/kWh to less than $0.05/kWh in good to moderate wind resource sites.

  4. PUBLISHED ONLINE: 31 JULY 2011 | DOI: 10.1038/NGEO1211 Carbon emission from hydroelectric reservoirs

    E-Print Network [OSTI]

    LETTERS PUBLISHED ONLINE: 31 JULY 2011 | DOI: 10.1038/NGEO1211 Carbon emission from hydroelectric * Hydroelectric reservoirs cover an area of 3.4 √? 105 km2 and comprise about 20% of all reservoirs. In addition dioxide and methane from hydroelectric reservoirs, on the basis of data from 85 globally distributed

  5. Medial design of blades for hydroelectric turbines and ship propellers M. Rossgatterera

    E-Print Network [OSTI]

    JŁttler, Bert

    Medial design of blades for hydroelectric turbines and ship propellers M. Rossgatterera , B. J Abstract We present a method for constructing blades of hydroelectric turbines and ship propellers based. Keywords: CAD-model, B-spline representation, hydroelectric turbine blade, propeller blade, medial axis

  6. EIS-0140: Ocean State Power Project, Tennessee Gas Pipeline Company

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to evaluate potential impacts of construction and operation of a new natural gas-fired, combined-cycle power plant which would be located on a 40.6-acre parcel in the town of Burrillville, Rhode Island, as well as construction of a 10-mile pipeline to transport process and cooling water to the plant from the Blackstone River and a 7.5-mile pipeline to deliver No. 2 fuel oil to the site for emergency use when natural gas may not be available. The Economic Regulatory Administration adopted the EIS on 7/15/1988.

  7. Buffalo Ridge II Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LP Biomass Facility Jump to:Brunei: Energy3 Wind Farm JumpIII

  8. Primus Power Corporation Smart Grid Demonstration Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,Pillar Group BV Jump to: navigation,Power RentalAreas-|Log JumpNew York,

  9. Project Fact Sheet Long Island HTS Power Cable Superconducting

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 | Department ofPlantLong Island HTS Power Cable

  10. Project Profile: Solar Power Tower Improvements with the Potential to

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of Energy TEES logoSolar PowerBostonModule

  11. Colorado Green Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CERCollier TechnologiesColorado Energy Office Jump

  12. Wisconsin Power and Light Company Smart Grid Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers Home Kyoung's pictureWindManitoba, Canada)Wisconsin Power

  13. Idaho Power Company Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup | OpenHunan Runhua New EnergyIT Power LimitedIdaTech UK JumpIdaho

  14. Beacon Power Corporation Smart Grid Demonstration Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in Carbon CaptureAtriaPower

  15. Power Systems Analysis Final Project Report UNI: tdp2114 1 Abstract--This document outlines the importance of, process

    E-Print Network [OSTI]

    Lavaei, Javad

    Power Systems Analysis Final Project Report UNI: tdp2114 1 Abstract--This document outlines of large scale power systems. The maintenance of such power systems is no small affair. Every moment systems maintenance in the most optimized and efficient manner. Keywords--Power Systems, Power Generation

  16. EA-1878: U.S. Department of Energy Loan Guarantee to Southwestern Solar Power, LLC for the Southwestern Solar Power Project in Palmdale, California, and near Tucson, Arizona

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to provide a DOE loan guarantee to Solar Power, LLC, for the Southwestern Solar Power Project in Palmdale, California, and near Tucson, Arizona. NOTE: EA has been cancelled.

  17. Xuan en Tongziying Hydroelectric Power Development Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers Home Kyoung'sWoongjinXenergaXinhuaHenengXinyiXjet

  18. Yingjiang County Binglang River Hydroelectric Power Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers HomeXuanen Shiziguan Hydropower CoYasunaga

  19. Shaowu Jinwei Hydroelectric Power Development Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with form HistoryRistma AGShandong Lusa NewInformation ShanxiShaowu

  20. Lintan Luertai Hydroelectric Power Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin ZhongdiantouLichuan City YujiangLincolnLinjiawuLinn

  1. Longyang Zone Hongqiang Hydroelectric Power Development Co Ltd | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin ZhongdiantouLichuanInformation Dayun Hydropower

  2. Lushui County Quande Hydroelectrical Power Development Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLu an Group Jump to: navigation, searchCentury

  3. Asia Power Leibo Hydroelectricity Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrimArkansasAshford, Alabama:Ashworths

  4. Wuxi Longshui Hydroelectric Power Development Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers Home Kyoung'sWoongjin PolysiliconWuxi Guofei Green

  5. Bihar State Hydroelectric Power Corp BSHPC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in Carbonof Alternative Sources ofBeyondPV CoSandy,

  6. Cangxi Jianghe Hydroelectric Power Development Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpen EnergyCallaway ElectricCambridge

  7. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    SciTech Connect (OSTI)

    Bharathan, D.

    2013-06-01T23:59:59.000Z

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  8. MHK Projects/Ward s Island Tidal Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose Bend < MHK Projects Jump to:Vicksburg Bend < MHK ProjectsWECs

  9. Environmental Impacts of Increased Hydroelectric Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    initiative promoting development at eXisting dams. 9 6 Turbine passage and mortality of fish. American Electric Power, Inc. . . . . Source: 15 7 Air emissions from electric...

  10. EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA

    Broader source: Energy.gov [DOE]

    DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

  11. 100kW Energy Transfer Multiplexer Power Converter Prototype Development Project

    SciTech Connect (OSTI)

    S. Merrill Skeist; Richard H. (Dick) Baker; Anthony G.P. Marini; DOE Project Officer - Keith Bennett

    2006-03-21T23:59:59.000Z

    Project Final Report for "100kW Energy Transfer Multiplexer Power Converter Prototype Development Project" prepared under DOE grant number DE-FG36-03GO13138. This project relates to the further development and prototype construction/evaluation for the Energy Transfer Multiplexer (ETM) power converter topology concept. The ETM uses a series resonant link to transfer energy from any phase of a multiphase input to any phase of a multiphase output, converting any input voltage and frequency to any output voltage and frequency. The basic form of the ETM converter consists of an eight (8)-switch matrix (six phase power switches and two ground power switches) and a series L-C resonant circuit. Electronic control of the switches allows energy to be transferred in the proper amount from any phase to any other phase. Depending upon the final circuit application, the switches may be either SCRs or IGBTs. The inherent characteristics of the ETM converter include the following: Power processing in either direction (bidirectional); Large voltage gain without the need of low frequency magnetics; High efficiency independent of output load and frequency; Wide bandwidth with fast transient response and; Operation as a current source. The ETM is able to synthesize true sinusoidal waveforms with low harmonic distortions. For a low power PM wind generation system, the ETM has the following characteristics and advantages: It provides voltage gain without the need of low frequency magnetics (DC inductors) and; It has constant high efficiency independent of the load. The ETM converter can be implemented into a PM wind power system with smaller size, reduced weight and lower cost. As a result of our analyses, the ETM offers wind power generation technology for the reduction of the cost and size as well as the increase in performance of low power, low wind speed power generation. This project is the further theoretical/analytical exploration of the ETM converter concept in relationship to PM wind power generator applications in the 100kW and under power range. The theoretical/analytical and bench scale work focuses on simplifying the basic ETM converter topology (in terms of parts count and complexity) for the specific application of the low power PM system. The project goals and objectives were for Spellman HV will develop a 100kW prototype ETM power converter based on paralleled lower ratings converters. The proposed configuration of this prototype is a 100kW rated converter comprised of four (4) 34kW rated modules connected in parallel (the fourth converter is included to demonstrate N+1 fault tolerance). This approach is more viable as there is lower technological risk involved in developing a 34kW-rated converter than a single 100kW unit. The modular system approach should have a lower deployment and service cost over a single unit system, because of the economics of scale (smaller units at a higher volume means lower manufacturing cost) and because of improved serviceability (a non-redundant power system with one failed module will still operate at a lower power level). There is also the added benefit that greater commercial application and acceptance should be achieved by having a modular system available in which fault tolerance (N+1 or 2N) is a feature. This modular approach would allow the output power to be increased by adding more paralleled converters. Thus, the maximum output power of the overall power system is a function of the interconnection medium (the hot swap connection subsystem), rather than the ratings of a single module. The project was implemented with Spellman HV acting as the program management and production assembly and test facility; The Baker Company acting as a technical consultant and resource when required; and dtm Associates acting as the design/development resource for the hardware development of the 100kW ETM converter prototype.

  12. EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

  13. SWOT: The Surface Water & Ocean Topography Satellite Mission

    E-Print Network [OSTI]

    Turkey launched Southeastern Anatolia Project (GAP): 22 dams 19 hydroelectric power plants n Irrigation

  14. The RenewElec Project: Variable Renewable Energy and the Power System

    SciTech Connect (OSTI)

    Apt, Jay

    2014-02-14T23:59:59.000Z

    Variable energy resources, such as wind power, now produce about 4% of U.S. electricity. They can play a significantly expanded role if the U.S. adopts a systems approach that considers affordability, security and reliability. Reaching a 20-30% renewable portfolio standard goal is possible, but not without changes in the management and regulation of the power system, including accurately assessing and preparing for the operational effects of renewable generation. The RenewElec project will help the nation make the transition to the use of significant amounts of electric generation from variable and intermittent sources of renewable power.

  15. Control of a Hydraulically-Powered Positioning System Project Report, Part 2

    E-Print Network [OSTI]

    Control of a Hydraulically-Powered Positioning System Project Report, Part 2 Written by Thomas Johnson ME6401: Linear Controls Submitted to Dr. Wayne Book 10/25/06 #12;SYSTEM MODEL AND PARAMETERS cylinder in order to control the position of an attached mass (m=200 kg). The circuit is controlled

  16. 1 Energy Markets and Policy Group Energy Analysis Department The Impact of Wind Power Projects

    E-Print Network [OSTI]

    Firestone, Jeremy

    1 Energy Markets and Policy Group · Energy Analysis Department The Impact of Wind Power Projects) This analysis was funded by the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Wind & Hydropower Technologies Program #12;2 Energy Markets and Policy Group · Energy Analysis

  17. Power system analysis project Modeling and Sizing optimization of Stand-alone

    E-Print Network [OSTI]

    Lavaei, Javad

    Power system analysis project Modeling and Sizing optimization of Stand-alone photovoltaic in examining the possibility to create a reliable stand-alone hybrid generation system composed of photovoltaic/wind-generator systems zhixing zhang 2013/5/30 Explore the possibility for supplying electricity using solar/wind hybrid

  18. S.Greaves 9/2011 ( 1 of 8) GPHY250 (2011)

    E-Print Network [OSTI]

    Abolmaesumi, Purang

    2011-01-01T23:59:59.000Z

    Project. Hydroelectric power plants--Environmental aspects--James Bay Region. Hydroelectric power plants sophisticated searches. #12;S.Greaves 9/2011 ( 3 of 8) Example: Search for KW "James Bay" and "Hydroelectric impacts of the James Bay Hydroelectric Project [electronic resource] Subjects:James Bay Hydroelectric

  19. Fuel Cell-Powered Lift Truck Fleet Deployment Projects Final Technical Report May 2014

    SciTech Connect (OSTI)

    Klingler, James J [GENCO Infrastructure Solutions, Inc.] [GENCO Infrastructure Solutions, Inc.

    2014-05-06T23:59:59.000Z

    The overall objectives of this project were to evaluate the performance, operability and safety of fork lift trucks powered by fuel cells in large distribution centers. This was accomplished by replacing the batteries in over 350 lift trucks with fuel cells at five distribution centers operated by GENCO. The annual cost savings of lift trucks powered by fuel cell power units was between $2,400 and $5,300 per truck compared to battery powered lift trucks, excluding DOE contributions. The greatest savings were in fueling labor costs where a fuel cell powered lift truck could be fueled in a few minutes per day compared to over an hour for battery powered lift trucks which required removal and replacement of batteries. Lift truck operators where generally very satisfied with the performance of the fuel cell power units, primarily because there was no reduction in power over the duration of a shift as experienced with battery powered lift trucks. The operators also appreciated the fast and easy fueling compared to the effort and potential risk of injury associated with switching heavy batteries in and out of lift trucks. There were no safety issues with the fueling or operation of the fuel cells. Although maintenance costs for the fuel cells were higher than for batteries, these costs are expected to decrease significantly in the next generation of fuel cells, making them even more cost effective.

  20. Projected electric power demands for the Potomac Electric Power Company. Volume 1

    SciTech Connect (OSTI)

    Estomin, S.; Kahal, M.

    1984-03-01T23:59:59.000Z

    This three-volume report presents the results of an econometric forecast of peak and electric power demands for the Potomac Electric Power Company (PEPCO) through the year 2002. Volume I describes the methodology, the results of the econometric estimations, the forecast assumptions and the calculated forecasts of peak demand and energy usage. Separate sets of models were developed for the Maryland Suburbs (Montgomery and Prince George's counties), the District of Columbia and Southern Maryland (served by a wholesale customer of PEPCO). For each of the three jurisdictions, energy equations were estimated for residential and commercial/industrial customers for both summer and winter seasons. For the District of Columbia, summer and winter equations for energy sales to the federal government were also estimated. Equations were also estimated for street lighting and energy losses. Noneconometric techniques were employed to forecast energy sales to the Northern Virginia suburbs, Metrorail and federal government facilities located in Maryland.

  1. Abstract--Limiting the emissions of greenhouse gases from power generation will depend, among other things, on the

    E-Print Network [OSTI]

    Harrison, Gareth

    other things, on the continuing and increased use of hydroelectric power. However, climate change itself provision of hydropower. Index Terms-- hydroelectric power generation, hydrology, meteorology, finance, risk1 Abstract-- Limiting the emissions of greenhouse gases from power generation will depend, among

  2. Draft Fourth Northwest Conservation and Electric Power Plan, Appendix B HYDROPOWER AVAILABILITY IN RESPONSE TO SALMON RECOVERY

    E-Print Network [OSTI]

    addresses only those measures that affect the operation of the Northwest's hydroelectric power system of the hydroelectric power system. Some energy is lost when it is spilled and some energy is shifted out of winterB-1 Draft Fourth Northwest Conservation and Electric Power Plan, Appendix B APPENDIX B HYDROPOWER

  3. Obtaining the right large power transformer for a hydro plant

    SciTech Connect (OSTI)

    Clemen, D.M. [Harza Engineering Company, Chicago, IL (United States)

    1995-07-01T23:59:59.000Z

    Transformer efficiency and reliability are important factors in determining the productivity of a hydroelectric generating plant. A well-supervised testing program can help plant owners and engineers improve the quality of equipment installed at their plant. This paper addresses such a program as applied to the selection of the generator step-up, or main power, transformer at a hydroelectric generating station.

  4. Southwestern Federal Power System combined financial statements and supplemental schedules for the years ended September 30, 1994 and 1993

    SciTech Connect (OSTI)

    Marwick, P.

    1994-12-31T23:59:59.000Z

    The Southwestern Federal Power System encompasses the operation of 24 hydroelectric power plants by the US Army Corps of Engineers and the marketing of power and energy from those plants by Southwestern Power Administration of the US Department of Energy. To integrate the operation of these hydroelectric generating plants and to transmit power from the dams to its customers, Southwestern Power Administration (Southwestern) maintains 2,220 kilometers (1,380 miles) of high-voltage transmission lines, 24 substations, and 46 microwave and VHF radio sites. Southwestern`s headquarters are in Tulsa, Oklahoma; its dispatch center is in Springfield, Missouri; and its maintenance crews are based in Jonesboro, Arkansas, in Gore and Tupelo, Oklahoma, and in Springfield, Missouri. Three divisions - Administration and Rates, Power Marketing and Delivery, and Maintenance - are responsible for meeting Southwestern`s mission. Twelve of the 24 generating plants are scheduled directly by Southwestern, and a total of 19 contribute to the interconnected system operations. Generation at the five remaining projects (Denison, Narrows, Sam Rayburn, Whitney, and Willis) is used to serve specific customer loads. At the end of fiscal year 1994, Southwestern marketed power and energy to 10 generation and transmission cooperatives, one distribution cooperative, three military installations, 41 municipal utilities, and three municipal utility joint-action agencies. One of the joint-action agencies has its own allocation of power from Southwestern; the other two serve 34 municipal utilities to whom Southwestern has allocated power. The total number of power allocation customers is 92. Additionally, excess energy is occasionally sold to non-allocation utilities. The primary purposes of Southwestern are to market Federally generated hydroelectric power, operate a reliable and safe transmission system, and encourage energy efficiency for the benefit of the region.

  5. Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for...

  6. Murray City Power- Net Metering Pilot Program

    Broader source: Energy.gov [DOE]

    Under a pilot program, Murray City Power offers net metering to customers that generate electricity using photovoltaic (PV), wind-electric or hydroelectric systems with a maximum capacity of 10...

  7. Microsoft PowerPoint - Vicksburg District Federal Power Projects Branson Conf. 6-2-10 .pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE SWPA / SPRA / FusionENERGY AND OUR

  8. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect (OSTI)

    Ashley, Paul

    2004-01-01T23:59:59.000Z

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).

  9. Wind Power Project Repowering: Financial Feasibility, Decision Drivers, and Supply Chain Effects

    SciTech Connect (OSTI)

    Lantz, E.; Leventhal, M.; Baring-Gould, I.

    2013-12-01T23:59:59.000Z

    As wind power facilities age, project owners are faced with plant end of life decisions. This report is intended to inform policymakers and the business community regarding the history, opportunities, and challenges associated with plant end of life actions, in particular repowering. Specifically, the report details the history of repowering, examines the plant age at which repowering becomes financially attractive, and estimates the incremental market investment and supply chain demand that might result from future U.S. repowering activities.

  10. Long-term allocation of power from the Snettisham Project. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-23T23:59:59.000Z

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan.

  11. Southeastern Power Administration 2007 Annual Report

    SciTech Connect (OSTI)

    none,

    2007-12-28T23:59:59.000Z

    Dear Secretary Chu: I am proud to submit Southeastern Power Administrationís (Southeasternís) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeasternís programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nationís power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineersí (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeasternís cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nationís water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect (OSTI)

    Eugene S. Grecheck

    2010-11-30T23:59:59.000Z

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    SciTech Connect (OSTI)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01T23:59:59.000Z

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  14. Southeastern Power Administration 2011 Annual Report

    SciTech Connect (OSTI)

    none,

    2011-12-31T23:59:59.000Z

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administrationís (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agencyís programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeasternís customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeasternís marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeasternís customer contract requirements. Southeasternís goal is to maximize the benefits of our regionís water resources. Competing uses of these resources will present another challenging year for Southeasternís employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast.

  15. EA-1992: Funding for Principle Power, Inc., for the WindFloat Pacific Offshore Wind Demonstration Project, offshore of Coos Bay, Oregon

    Broader source: Energy.gov [DOE]

    Funding for Principle Power, Inc., for the WindFloat Pacific Offshore Wind Demonstration Project, offshore of Coos Bay, Oregon

  16. Southeastern Power Administration 2008 Annual Report

    SciTech Connect (OSTI)

    none,

    2008-12-29T23:59:59.000Z

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administrationís (Southeasternís) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agencyís programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customersí contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineersí (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeasternís cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our regionís water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeasternís employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  17. Shimen Boyuan Hydroelectric Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with form HistoryRistma AGShandong LusaShelby,SoopowerShimen Boyuan Hydroelectric

  18. Ningguo Liucunba Hydroelectric Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLuOpen EnergyNelsoniX LtdNewNingguo Liucunba Hydroelectric Co Ltd

  19. Data base on dose reduction research projects for nuclear power plants. Volume 5

    SciTech Connect (OSTI)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K. [Brookhaven National Lab., Upton, NY (United States)] [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01T23:59:59.000Z

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  20. FUTURE HYDROELECTRIC DEVELOPMENT SECTION 12 FISH AND WILDLIFE PROGRAM 12-1 September 13, 1995

    E-Print Network [OSTI]

    FUTURE HYDROELECTRIC DEVELOPMENT SECTION 12 FISH AND WILDLIFE PROGRAM 12-1 September 13, 1995 to Columbia River Basin fish and wildlife by hydropower development and operations in the past. But the future drainage basins that contain important anadromous fish habitat. However, most new hydroelectric development

  1. Sources and fluxes of carbon in a large boreal hydroelectric reservoir of eastern Canada: an isotopic approach

    E-Print Network [OSTI]

    Long, Bernard

    Sources and fluxes of carbon in a large boreal hydroelectric reservoir of eastern Canada Hydroelectric reservoirs emit greenhouse gases (GHGs). Although a few hypothesis have been put forward at the surface of a large boreal hydroelectric reservoir of eastern Canada (Robert-Bourassa) as well

  2. Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus

    E-Print Network [OSTI]

    Turemen, G; Unel, G; Alacakir, A

    2015-01-01T23:59:59.000Z

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

  3. EIS-0357- Gilberton Coal-to-Clean Fuels and Power Project in Giberton, PA

    Broader source: Energy.gov [DOE]

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action to provide cost-shared funding for construction and operation of facilities near Gilberton, Pennsylvania, which have been proposed by WMPI PTY, LLC, for producing electricity, steam, and liquid fuels from anthracite coal waste (culm). The project was selected by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate the integration of coal waste gasification and Fischer-Tropsch (F-T) synthesis of liquid hydrocarbon fuels at commercial scale.

  4. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect (OSTI)

    Bradbury, Allen; Slavin, Katie

    1998-10-28T23:59:59.000Z

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  5. Recent drilling activities at the earth power resources Tuscarora geothermal power project's hot sulphur springs lease area.

    SciTech Connect (OSTI)

    Goranson, Colin

    2005-03-01T23:59:59.000Z

    Earth Power Resources, Inc. recently completed a combined rotary/core hole to a depth of 3,813 feet at it's Hot Sulphur Springs Tuscarora Geothermal Power Project Lease Area located 70-miles north of Elko, Nevada. Previous geothermal exploration data were combined with geologic mapping and newly acquired seismic-reflection data to identify a northerly tending horst-graben structure approximately 2,000 feet wide by at least 6,000 feet long with up to 1,700 feet of vertical offset. The well (HSS-2) was successfully drilled through a shallow thick sequence of altered Tertiary Volcanic where previous exploration wells had severe hole-caving problems. The ''tight-hole'' drilling problems were reduced using drilling fluids consisting of Polymer-based mud mixed with 2% Potassium Chloride (KCl) to reduce Smectite-type clay swelling problems. Core from the 330 F fractured geothermal reservoir system at depths of 2,950 feet indicated 30% Smectite type clays existed in a fault-gouge zone where total loss of circulation occurred during coring. Smectite-type clays are not typically expected at temperatures above 300 F. The fracture zone at 2,950 feet exhibited a skin-damage during injection testing suggesting that the drilling fluids may have caused clay swelling and subsequent geothermal reservoir formation damage. The recent well drilling experiences indicate that drilling problems in the shallow clays at Hot Sulphur Springs can be reduced. In addition, average penetration rates through the caprock system can be on the order of 25 to 35 feet per hour. This information has greatly reduced the original estimated well costs that were based on previous exploration drilling efforts. Successful production formation drilling will depend on finding drilling fluids that will not cause formation damage in the Smectite-rich fractured geothermal reservoir system. Information obtained at Hot Sulphur Springs may apply to other geothermal systems developed in volcanic settings.

  6. Table 1. Proposal Project Number 2008-307-00

    E-Print Network [OSTI]

    including the Pelton Round Butte Hydroelectric Project (PRB Project) which was completed in 1964 (Nehlsen 1995), are among the factors contributing to sockeye extinction. The PRB Project is owned and operated, a Settlement Agreement concerning the relicensing of the PRB Project was made by and among the Licensees and 21

  7. Southeastern Power Administration 2012 Annual Report

    SciTech Connect (OSTI)

    none,

    2012-01-01T23:59:59.000Z

    Dear Secretary Moniz: I am pleased to submit Southeastern Power Administrationís (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agencyís programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeasternís customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeasternís marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeasternís customer contract requirements. Southeasternís goal is to maximize the benefits of our regionís water resources. Competing uses of these resources will present another challenging year for Southeasternís employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator

  8. MHK Projects/Wave Powered Pumping of Seawater for On Shore Use...

    Open Energy Info (EERE)

    s Cove Burin Peninsula, Newfoundland Project Country Canada Project Resource Click here Wave Coordinates 46.53, -55.4 Project Phase Phase 3 Project Details Although SARAHS Pump...

  9. Role of pilot projects and public acceptance in developing wireless power transmission as an enabling technology for space solar power systems

    SciTech Connect (OSTI)

    Woodell, M.I. [Bivings Woodell, Inc., Washington, DC (United States)] [Bivings Woodell, Inc., Washington, DC (United States); Schupp, B.W. [Raytheon Electronic Systems, Marlborough, MA (United States)] [Raytheon Electronic Systems, Marlborough, MA (United States)

    1996-12-31T23:59:59.000Z

    In all system concepts for delivering space solar power to terrestrial power systems, wireless power transmission (WPT) is identified as a critical link in the technology chain. To realize the full potential of WPT as an enabling technology for the development of space power systems, the technology needs to (1) be demonstrated as a commercially viable, low risk technology, and (2) be shown to be acceptable to the public. If WPT`s full potential is to be realized, its initial applications must be carefully chosen and demonstrated through a series of pilot projects which will develop both the technology and its public acceptance. This paper examines the role of pilot projects and how they will play an increasingly important role in the development and acceptance of WPT as an enabling technology for space solar power systems. Recognizing that public acceptance is the ultimate determinant of the commercial success or failure of a technology, the paper then explores the role of public opinion in the commercialization process of space solar power systems utilizing WPT. A framework that begins to define the process required to realize the full commercial potential of wireless power transmission is established. 21 refs., 1 fig., 2 tabs.

  10. MHK Projects/Lock and Dam No 2 Hydroelectric Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther, Oklahoma: EnergyMARECInformationGriffinCABend

  11. Phenix Power Plant Decommissioning Project. Treatment of the Primary Cold Trap

    SciTech Connect (OSTI)

    Deluge, M. [CEA /Marcoule DDCO/SDSP BP 17171 302078 Bagnols Sur Ceze (France)

    2008-01-15T23:59:59.000Z

    Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase includes the operations authorized within the standard operating methodological framework. The dismantling phase also comprises treatment of sodium-bearing waste and dismantling of the nuclear facilities (reactor block, shielded cells, etc.). Treatment of the Phenix primary cold trap is scheduled to begin in 2016. The analysis program includes the following steps: - Accurately determine the contamination in the trap by carrying out gamma spectrometry measurement campaigns from 2007 to 2013 (the remaining difficulty will be to accurately determine the distribution of the contamination). - Validate the safety studies for the ELA facility. This work is currently in progress; ELA will be commissioned following inactive qualification testing. - Proceed with cutting tests on the knit mesh filter, which are scheduled to begin in 2008.

  12. Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

  13. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01T23:59:59.000Z

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

  14. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-08-01T23:59:59.000Z

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  15. A Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development (Book), Powered by SunShot, U.S. Department of Energy (DOE)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  16. EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware

    Broader source: Energy.gov [DOE]

    Pepco Holdings, Inc., cancelled its proposed Phase II of the Mid-Atlantic Power Pathway transmission line project and DOE cancelled preparation of an EIS on the potential environmental impacts of a proposed federal loan guarantee for the project.

  17. PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan; Cory, Karlynn; James, Ted

    2009-03-11T23:59:59.000Z

    Renewable power technologies are inherently capital-intensive, often (but not always) with relatively high construction costs and low operating costs. For this reason, renewable power technologies are typically more sensitive to the availability and cost of financing than are natural gas power plants, for example. In the United States, the bulk of renewable project finance in recent years has been provided by 'tax equity investors' (typically large investment banks and insurance companies) who partner with project developers through highly specialized financing structures (Bolinger, 2009; Cory et al., 2008; Harper et al., 2007). These structures have been designed primarily to capitalize on federal support for renewable power technologies, which has historically come in the form of tax credits and accelerated depreciation deductions. The number of tax equity investors active in the renewable power market has declined precipitously, however, as a result of the financial crisis that began unfolding across the globe in the summer of 2008. The resulting shortage and increased cost of project financing has, in turn, slowed the development of new renewable power projects, leading to layoffs throughout the entire industry supply chain. In recognition of the fact that tax-based policy incentives are not particularly effective when tax burdens are shrinking or non-existent, Congress included several provisions in 'The American Recovery and Reinvestment Act of 2009' (ARRA 2009) designed to make federal incentives for renewable power technologies more useful. Among these provisions is one that allows projects eligible to receive the production tax credit ('the PTC', see Text Box 1) to instead elect the investment tax credit ('the ITC', see Text Box 2). Another provision enables ITC-eligible projects (which now include most PTC-eligible renewable power projects) to instead receive--for a limited time only--a cash grant of equivalent value. These two provisions (among others) could have a significant impact on how renewable power projects are financed over the next few years. The purpose of this report is to both quantitatively and qualitatively analyze, from the project developer/owner perspective, the choice between the PTC and the ITC (or equivalent cash grant) for a number of different renewable power technologies.1 Because the two credits are structured differently, and apply in different ways to different technologies, the choice between the two lends itself to quantitative financial analysis of the conditions under which either the PTC or the ITC would, at least in theory, provide greater financial value. Qualitative considerations may be equally important, however, particularly in instances where quantitative differences are modest. This report proceeds as follows. Section 2 provides a brief summary of ARRA 2009, with some emphasis on those provisions designed to ease the liquidity crisis facing the renewable power sector. Section 3 describes the quantitative analysis methodology, as well as modeling results for wind, open-loop biomass, closed-loop biomass, geothermal, and landfill gas projects. Section 4 discusses a number of qualitative considerations that may play as important of a role as quantitative results in deciding between the PTC and the ITC (or equivalent cash grant). Section 5 concludes, and an Appendix provides supplemental tables that present quantitative analysis results conducted at different discount rates.

  18. Sixth Northwest Conservation and Electric Power Plan Appendix L: Climate Change and Power

    E-Print Network [OSTI]

    demand for electricity and production of hydroelectric generation. Global climate change models all seem. There are at least two ways in which climate can affect the power plan. First, warming trends will alter electricitySixth Northwest Conservation and Electric Power Plan Appendix L: Climate Change and Power Planning

  19. Galena Electric Power A Situational Analysis

    SciTech Connect (OSTI)

    Robert E. Chaney; Stephen G. Colt; Ronald A. Johnson; Richard W. Wiles; Gregory J. White

    2008-12-31T23:59:59.000Z

    The purpose of the investigation is to compare the economics of various electrical power generation options for the City of Galena. Options were assessed over a 30-year project period, beginning in 2010, and the final results were compared on the basis of residential customer electric rates ($/kWh). Galena's electric utility currently generates power using internal combustion diesel engines and generator sets. Nearby, there is an exposed coal seam, which might provide fuel for a power plant. Contributions to the energy mix might come from solar, municipal solid waste, or wood. The City has also been approached by Toshiba, Inc., as a demonstration site for a small (Model 4S) nuclear reactor power plant. The Yukon River is possibly a site for in-river turbines for hydroelectric power. This report summarizes the comparative economics of various energy supply options. This report covers: (1) thermal and electric load profiles for Galena; (2) technologies and resources available to meet or exceed those loads; (3) uses for any extra power produced by these options; (4) environmental and permitting issues and then; and (5) the overall economics of each of the primary energy options.

  20. Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia)

    Broader source: Energy.gov [DOE]

    It is the policy of the Commonwealth of Virginia to encourage the utilization of its water resources to the greatest practicable extent, to control the waters of the Commonwealth, and also to...

  1. Minnesota Agri Power Project. Quarterly report, July 1, 1997--September 30, 1997

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    Program status and accomplishments for a project to develop alfalfa as a biomass fuel for power generation are summarized in this report. The main areas of reporting include: (1) alfalfa separation pilot plant testing, (2) design of gasification plant, (3) alfalfa leaf meal feeding trials and analysis, (4) integrated plant design and cost estimate, and (5) site plan construction and environmental permits. The alfalfa separation pilot plant fractionation equipment encountered operating problems from rocks and other tramp materials in the alfalfa bales. An investigation of techniques and equipment to remove the tramp materials resulted in the selection of a vibrating conveyor system. The Carbona gasification plant design basis and the Westinghouse scope of supply and design basis for the hot gas filter are provided in the report. The alfalfa leaf meal feeding trials showed that this economically critical co-product can be a viable livestock feed ingredient if favorable price, availability, and quality are maintained. The Stone and Webster basis of design for the integrated plant is included, and the basis for development of gas turbine performance runs is also detailed.

  2. Project Sponsors:ADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    -load power is unable to adjust to renewable variability, introducing curtailment of wind and solar power due-induced exponential capacity effects for a 50/50 mix of wind and solar power HiGRID Tool Development of the Holistic on Grid CO2 Emissions This highlights the importance of increasing the flexibility of balancing power

  3. Project Sponsor: Department of EnergyADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    analysis of a Vision 21 coal based zero emission power plant," J. of Power Sources, V 158, pp 417-427, 2006 and Coal Central Plants," J. of Power and Energy, V 219, Part A, 2005 PERSONNEL Graduate Students: Mu Li at 75% efficiency (LHV to AC) ∑Develop coal fueled power plant concepts that meet all criteria pollutant

  4. 2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles

    E-Print Network [OSTI]

    Leung, Victor C.M.

    .M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

  5. Southwestern Federal Power System 1995 Financial Statement audit under the Chief Financial Officers Act (WR-FC-96-02)

    SciTech Connect (OSTI)

    NONE

    1996-02-22T23:59:59.000Z

    The Southwestern Federal Power System encompasses the operation of 24 hydroelectric power plants by the U.S. Army Corps of Engineers and the marketing of power and energy from those plants by the Southwestern Power Administration of the U.S. Department of Energy. To integrate the operation of these hydroelectric generating plants and to transmit power from the dams to its customers, Southwestern Power Administration (Southwestern) maintains 2,220 kilometers (1,380 miles) of high-voltage transmission lines, 24 substations, and 46 microwave and VHF radio sites. Southwestern`s headquarters are in Tulsa, Oklahoma; its dispatch center is in Springfield, Missouri; and its maintenance crews are based in Jonesboro, Arkansas, in Gore and Tupelo, Oklahoma, and in Springfield, Missouri. Three offices - Power Marketing and Delivery, Maintenance, and Administration and Rates - are responsible for meeting Southwestern`s mission. Twelve of the 24 generating plants are scheduled directly by Southwestern, and a total of 19 contribute to the interconnected system operations. Generation at the five remaining projects (Denison, Narrows, Sam Rayburn, Whitney, and Willis) is used to serve specific customer loads. At the end of fiscal year 1995, Southwestern marketed power and energy to 10 generation and transmission cooperatives, one distribution cooperative, three military installations, 44 municipal utilities, and three municipal utility joint-action agencies. One of the joint-action agencies has its own allocation of power from Southwestern; the other two serve 33 municipal utilities to whom Southwestern has allocated power. The total number of power allocation customers is 92. Additionally, excess energy is occasionally sold to non-allocation utilities.

  6. Power Sales to Electric Utilities

    SciTech Connect (OSTI)

    None

    1989-02-01T23:59:59.000Z

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

  7. NREL Small Wind Turbine Test Project: Mariah Power's Windspire Wind Turbine Test Chronology

    SciTech Connect (OSTI)

    Huskey, A.; Forsyth, T.

    2009-06-01T23:59:59.000Z

    This report presents a chronology of tests conducted at NREL's National Wind Technology Center on Mariah Power's Windspire 1.2-kW wind turbine and a letter of response from Mariah Power.

  8. An examination of the pursuit of nuclear power plant construction projects in the United States

    E-Print Network [OSTI]

    Guyer, Brittany (Brittany Leigh)

    2011-01-01T23:59:59.000Z

    The recent serious reconsideration of nuclear power as a means for U.S. electric utilities to increase their generation capacity provokes many questions regarding the achievable success of future nuclear power plant ...

  9. Investigation of an integrated switchgrass gasification/fuel cell power plant. Final report for Phase 1 of the Chariton Valley Biomass Power Project

    SciTech Connect (OSTI)

    Brown, R.C.; Smeenk, J. [Iowa State Univ., Ames, IA (United States); Steinfeld, G. [Energy Research Corp., Danbury, CT (United States)

    1998-09-30T23:59:59.000Z

    The Chariton Valley Biomass Power Project, sponsored by the US Department of Energy Biomass Power Program, has the goal of converting switchgrass grown on marginal farmland in southern Iowa into electric power. Two energy conversion options are under evaluation: co-firing switchgrass with coal in an existing utility boiler and gasification of switchgrass for use in a carbonate fuel cell. This paper describes the second option under investigation. The gasification study includes both experimental testing in a pilot-scale gasifier and computer simulation of carbonate fuel cell performance when operated on gas derived from switchgrass. Options for comprehensive system integration between a carbonate fuel cell and the gasification system are being evaluated. Use of waste heat from the carbonate fuel cell to maximize overall integrated plant efficiency is being examined. Existing fuel cell power plant design elements will be used, as appropriate, in the integration of the gasifier and fuel cell power plant to minimize cost complexity and risk. The gasification experiments are being performed by Iowa State University and the fuel cell evaluations are being performed by Energy Research Corporation.

  10. Prevented Mortality and Greenhouse Gas Emissions from Historical and Projected Nuclear Power

    E-Print Network [OSTI]

    ABSTRACT: In the aftermath of the March 2011 accident at Japan's Fukushima Daiichi nuclear power plant, the future contribution of nuclear power to the global energy supply has become somewhat uncertain. Because of the Fukushima accident, we find that nuclear power could additionally prevent an average of 420 000-7.04 million

  11. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  12. EA-1616: National Carbon Research Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama

    Broader source: Energy.gov [DOE]

    This EA evaluates and updates the potential environmental impacts of DOEís proposed continued operations of the NCCC Project at the PSDF plant. The NCCC is designed to test and evaluate carbon dioxide (CO2) control technologies for power generation facilities, including CO2 capture solvents and sorbents, mass-transfer devices, lower cost water-gas shift reactors, and scaled-up membrane technologies. Additionally, the NCCC evaluates methods to integrate CO2 capture technologies with other coal-based power plant systems by testing both pre-combustion and post-combustion technologies. The NCCC provides the capability to test these systems under a wide range of fuels, including bituminous and sub-bituminous coals, lignites and biomass/coal mixtures. The goal of the NCCC project is to accelerate the development, optimization, and commercialization of viable CO2 control technologies.

  13. 14 Diffusive CO2 Flux at the Air-Water Interface of the Robert-Bourassa Hydroelectric Reservoir in

    E-Print Network [OSTI]

    Long, Bernard

    Hydroelectric reservoirs and lakes in boreal Quťbec produce greenhouse gases (GHG) mainly in the form of CO214 Diffusive CO2 Flux at the Air-Water Interface of the Robert-Bourassa Hydroelectric Reservoir. No method exists, however, which can directly measure the flux of CO2 across the air-water interface

  14. Dam and Hydroelectric Powerplant University of Hawai`i CEE 491University of Hawai`i CEE 491

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    Karun 3 Dam and Hydroelectric Powerplant University of Hawai`i ≠ CEE 491University of Hawai`i ≠ CEE;Location #12;Description/Background Hydroelectric dam on Karun River Help with national energy needs #12;Social & Economic Benefits Flood Control Dam reservoirs help to control floods Mitigate high peak

  15. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    SciTech Connect (OSTI)

    None

    1998-04-01T23:59:59.000Z

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  16. Minnesota agri-power project. Quarterly report, January--March 1997

    SciTech Connect (OSTI)

    Baloun, J.

    1997-04-01T23:59:59.000Z

    This project involves the growing of trial quantities of alfalfa for gasification pilot plant tests and the use of by-products of alfalfa plants as animal feeds for beef and dairy cattle and turkeys. The various tasks under this project are described. Tasks are: design; review and confirm feedstock supply plan; performance guarantees and warranties; sales contracts; site plan construction and environmental permits report; environmental monitoring plan; and project management, engineering, and administration.

  17. Secretary Chu Unveils 41 New Offshore Wind Power R&D Projects...

    Energy Savers [EERE]

    The above map shows the headquarters locations of all 41 projects. Those shown in blue are focused on advancing offshore wind technologies, such as modeling and design of...

  18. The Neutrino Factory and Muon Collider Collaboration High-Power Targets for Project X and Beyond

    E-Print Network [OSTI]

    McDonald, Kirk

    Future Facilties ESS IFMIF ISOL/ Beams PSI APT ATW Kirk T. McDonald Project X Workshop, Nov 13, 2007 4

  19. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-07-01T23:59:59.000Z

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  20. The Power of Water Renegotiating the Columbia River Treaty

    E-Print Network [OSTI]

    . However, post-World War II, hydroelectric power was seen as a way to create new jobs and to meet growingThe Power of Water Renegotiating the Columbia River Treaty Emma S. Norman, PhD Dept. of Social to value `power' over `fish' with the signing of the Columbia River Treaty in 1964. Now, forty years later

  1. Image courtesy of the Image Science & Analysis Laboratory, NASA Johnson Space Center (ISS006-E-42326). The hydroelectrical potential of North-Western

    E-Print Network [OSTI]

    Borsdorf, Axel

    -42326). #12;The hydroelectrical potential of North-Western Patagonia ­ balancing economic development and ecological protection axel borsdorf #12;156 The hydroelectrical potential of North-Western Patagonia the rest an expansion of the hydroelectric potential, first proposed 30 years ago (Borsdorf 1987: 156ff), can

  2. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    SciTech Connect (OSTI)

    National Energy Technology Laboratory

    2002-07-31T23:59:59.000Z

    The transportation sector accounts for a large and growing share of global greenhouse gas (GHG) emissions. Worldwide, motor vehicles emit well over 900 million metric tons of carbon dioxide (CO2) each year, accounting for more than 15 percent of global fossil fuel-derived CO2 emissions.1 In the industrialized world alone, 20-25 percent of GHG emissions come from the transportation sector. The share of transport-related emissions is growing rapidly due to the continued increase in transportation activity.2 In 1950, there were only 70 million cars, trucks, and buses on the worldís roads. By 1994, there were about nine times that number, or 630 million vehicles. Since the early 1970s, the global fleet has been growing at a rate of 16 million vehicles per year. This expansion has been accompanied by a similar growth in fuel consumption.3 If this kind of linear growth continues, by the year 2025 there will be well over one billion vehicles on the worldís roads.4 In a response to the significant growth in transportation-related GHG emissions, governments and policy makers worldwide are considering methods to reverse this trend. However, due to the particular make-up of the transportation sector, regulating and reducing emissions from this sector poses a significant challenge. Unlike stationary fuel combustion, transportation-related emissions come from dispersed sources. Only a few point-source emitters, such as oil/natural gas wells, refineries, or compressor stations, contribute to emissions from the transportation sector. The majority of transport-related emissions come from the millions of vehicles traveling the worldís roads. As a result, successful GHG mitigation policies must find ways to target all of these small, non-point source emitters, either through regulatory means or through various incentive programs. To increase their effectiveness, policies to control emissions from the transportation sector often utilize indirect means to reduce emissions, such as requiring specific technology improvements or an increase in fuel efficiency. Site-specific project activities can also be undertaken to help decrease GHG emissions, although the use of such measures is less common. Sample activities include switching to less GHG-intensive vehicle options, such as electric vehicles (EVs) or hybrid electric vehicles (HEVs). As emissions from transportation activities continue to rise, it will be necessary to promote both types of abatement activities in order to reverse the current emissions path. This Resource Guide focuses on site- and project-specific transportation activities. .

  3. Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

  4. Flex power perspectives of indirect power system control through...

    Open Energy Info (EERE)

    power perspectives of indirect power system control through dynamic power price (Smart Grid Project) Jump to: navigation, search Project Name Flex power perspectives of indirect...

  5. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    SciTech Connect (OSTI)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01T23:59:59.000Z

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000) found useful turbine passage survival data for only 30 species. Tests of advanced hydropower turbines have been limited to seven species - Chinook and coho salmon, rainbow trout, alewife, eel, smallmouth bass, and white sturgeon. We are investigating possible approaches for extending experimental results from the few tested fish species to predict turbine passage survival of other, untested species (Cada and Richmond 2011). In this report, we define the causes of injury and mortality to fish tested in laboratory and field studies, based on fish body shape and size, internal and external morphology, and physiology. We have begun to group the large numbers of unstudied species into a small number of categories, e.g., based on phylogenetic relationships or ecological similarities (guilds), so that subsequent studies of a few representative species (potentially including species-specific Biological Index Testing) would yield useful information about the overall fish community. This initial effort focused on modifying approaches that are used in the environmental toxicology field to estimate the toxicity of substances to untested species. Such techniques as the development of species sensitivity distributions (SSDs) and Interspecies Correlation Estimation (ICE) models rely on a considerable amount of data to establish the species-toxicity relationships that can be extended to other organisms. There are far fewer studies of turbine passage stresses from which to derive the turbine passage equivalent of LC{sub 50} values. Whereas the SSD and ICE approaches are useful analogues to predicting turbine passage injury and mortality, too few data are available to support their application without some form of modification or simplification. In this report we explore the potential application of a newer, related technique, the Traits-Based Assessment (TBA), to the prediction of downstream passage mortality at hydropower projects.

  6. EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

  7. Electric power monthly, September 1990. [Glossary included

    SciTech Connect (OSTI)

    Not Available

    1990-12-17T23:59:59.000Z

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  8. Response to Comment on "Prevented Mortality and Greenhouse Gas Emissions from Historical and Projected Nuclear Power"

    E-Print Network [OSTI]

    the common misconception that the electric energy produced by different electricity sources is interchangeable. For near-term mitigation of climate change and air pollution, fossil fuel sources of base load power such as coal and natural gas (i.e., those that can provide essentially continuous power) are most

  9. Power Line Damage, Electrical Outages Reduced in the ''Sleet Belt'': NICE3 Steel Project Fact Sheet

    SciTech Connect (OSTI)

    NONE

    2000-04-25T23:59:59.000Z

    The AR Windamper System was developed through a grant from the Inventions and Innovation Program, to protect power transmission lines in sleet belt states and provinces by eliminating the ''galloping'' phenomenon. Wind damping products minimize power outages and reduce repair costs to transmission lines.

  10. Hybrid Human Powered Vehicle (Phase 3) The Zero EMission (ZEM) Vehicle Project

    E-Print Network [OSTI]

    Su, Xiao

    Continuous charging batteries by solar PV while driving the vehicle in sunny days, and parking in open lot and testing P-2 Sponsors: SJSU-COE, SunPower Corp. San Jose, and Clean Battery Technologies Inc. Santa Clara Base: 4' wide x 8'-6" long Power Sources: Human pedaling/ Electricity/Solar PV Freight Weight: 1200 lbs

  11. EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

  12. EIS-0280: Proposed Clean Power from Integrated Coal/Ore Reduction Project (CPICOR) at Vineyard, Utah

    Broader source: Energy.gov [DOE]

    This EIS assesses the potential environmental and human health impacts of a proposed project under the Clean Coal Technology Program that would integrate the production of molten iron for steelmaking with the production of electricity.

  13. PowerProjections2003(FPavgusing8-03water)(avgalloc)II.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2:49 PM Average Hydro Forecast - Depletions capped in 2009 Customer allocations set to average generation forecast WY Net Gen Total Firm Project Use Total Load Purch @ Load AHP...

  14. Valuation of wind energy projects and statistical analysis of wind power

    E-Print Network [OSTI]

    Nanopoulos, Andrew

    2012-01-01T23:59:59.000Z

    As energy becomes an increasingly important issue for generations to come, it is crucial to develop tools for valuing and understanding energy projects from an economic perspective since ultimately only economically viable ...

  15. Opportunities for Small Geothermal Projects: Rural Power for Latin America, the Caribbean, and the Philippines

    SciTech Connect (OSTI)

    Vimmerstedt, L.

    1998-11-30T23:59:59.000Z

    The objective of this report is to provide information on small geothermal project (less than 5 MW) opportunities in Latin America, the Caribbean, and the Philippines. This overview of issues facing small geothermal projects is intended especially for those who are not already familiar with small geothermal opportunities. This is a summary of issues and opportunities and serves as a starting point in determining next steps to develop this market.

  16. The net carbon footprint of a newly created boreal hydroelectric reservoir

    E-Print Network [OSTI]

    Long, Bernard

    The net carbon footprint of a newly created boreal hydroelectric reservoir Cristian R. Teodoru,1 present here the first comprehensive assessment of the carbon (C) footprint associated with the creation-term at rates exceeding the carbon footprint of the pre-flood landscape, although the sources of C supporting

  17. FACTORS FOR DECLINE 3.4.5 EFFECTS OF HYDROELECTRIC DAMS ON VIABILITY OF WILD FISH

    E-Print Network [OSTI]

    FACTORS FOR DECLINE 3.4.5 EFFECTS OF HYDROELECTRIC DAMS ON VIABILITY OF WILD FISH The existence and operation of the Columbia River Hydrosystem poses risks to wild populations of anadromous salmonids. Run-tagged hatchery fish or a mixture of hatchery and wild fish are used as indicator stocks. In the Snake River

  18. Microsoft PowerPoint - HVBPL Project Summary_Renz_APPROVED_2009...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the United States Government or any agency thereof. Powering the 21 st Century Economy Office of Electricity Delivery and Energy Reliability MODERN GRID S T R A T E G Y 3...

  19. Hybrid energy storage test procedures and high power battery project FY-1995 interim report

    SciTech Connect (OSTI)

    Hunt, G.L.

    1995-12-01T23:59:59.000Z

    Near the end of FY 1994, DOE provided funding and guidance to INEL for two separate but closely related tasks involving high power energy storage technology. One task was intended to develop and refine application-specific test procedures appropriate to high power energy storage devices for potential use in hybrid vehicles, including batteries, ultracapacitors, flywheels, and similar devices. The second task was intended to characterize the high power capabilities of presently available battery technologies, as well as eventually to evaluate the potential high power capabilities of advanced battery technologies such as those being developed by the USABC. Since the evaluation of such technologies is necessarily dependent to some extent on the availability of appropriate test methods, these two tasks have been closely coordinated. This report is intended to summarize the activities and results for both tasks accomplished during FY-1995.

  20. Next Generation Short-Term Forecasting of Wind Power Overview of the ANEMOS Project.

    E-Print Network [OSTI]

    Boyer, Edmond

    of difficulties to the power system operation. This is due to the fluctuating nature of wind generation to the management of wind generation. Accurate and reliable forecasting systems of the wind production are widely

  1. EIS-0232: Sierra Nevada 2004 Power Marketing Program EIS (Central Valley Project)

    Broader source: Energy.gov [DOE]

    The Sierra Nevada Region needs to determine the level and character of capacity, energy, and other services that will be marketed beyond 2004. These services would be developed by combining potential hydropower operating approaches with power purchases. The Sierra Nevada Region also needs to establish eligibility and allocation criteria for the allocations of electric power resources to be marketed under contracts that will replace those expiring in 2004

  2. Southwestern Power Administration Annual Report 2007

    SciTech Connect (OSTI)

    none,

    2008-01-01T23:59:59.000Z

    ďRenewable energyĒ isnít just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwesternís employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwesternís new Administrator, I have had the opportunity to view our operations from a fresh perspective, and Iím proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERCís control performance standards throughout the year. When tasked with reducing the agencyís carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwesternís revenues -- a huge win-win for Southwesternís ratepayers and the Nationís taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nationís water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy was generated from the 24 Federal hydroelectric projects in our marketing region, producing annual revenues of $161 million. In this time of rising energy costs, the Nationís need for renewable energy has never been greater. Hydropower Ė and the people of Southwestern Ė stand ready to help meet that need.

  3. America's Bottom-Up Climate Change Mitigation Policy

    E-Print Network [OSTI]

    Lutsey, Nicholas P.; Sperling, Dan

    2008-01-01T23:59:59.000Z

    large conventional hydroelectric power, municipal solidconventional large hydroelectric power). To quantify thelarge conventional hydroelectric power is not included (this

  4. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  5. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2002-03-01T23:59:59.000Z

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

  6. Methane for Power Generation in Muaro Jambi: A Green Prosperity Model Project

    SciTech Connect (OSTI)

    Moriarty, K.; Elchinger, M.; Hill, G.; Katz, J.; Barnett, J.

    2014-07-01T23:59:59.000Z

    NREL conducted eight model projects for Millennium Challenge Corporation's (MCC) Compact with Indonesia. Green Prosperity, the largest project of the Compact, seeks to address critical constraints to economic growth while supporting the Government of Indonesia's commitment to a more sustainable, less carbon-intensive future. This study evaluates electricity generation from the organic content of wastewater at a palm oil mill in Muaro Jambi, Sumatra. Palm mills use vast amounts of water in the production process resulting in problematic waste water called palm oil mill effluent (POME). The POME releases methane to the atmosphere in open ponds which could be covered to capture the methane to produce renewable electricity for rural villages. The study uses average Indonesia data to determine the economic viability of methane capture at a palm oil mill and also evaluates technology as well as social and environmental impacts of the project.

  7. Decision on the Northern California Power Agency's application for certification for Geothermal Project No. 2

    SciTech Connect (OSTI)

    Not Available

    1980-02-01T23:59:59.000Z

    Findings on compliance with statutory site certification requirements, a discussion of the Joint Environmental Study and its significance in terms of the California Environmental Quality and National Environmental Policy Acts, a brief recapitulation of the procedural steps which occured, and a summary of the evidentiary bases for this Decision are included. Topical discussions on the various human and natural environmental areas impacted by the project, as well as the technical, engineering, and other areas of concern affected by the project are presented. These topical discussions summarize the basis for the Commission's ultimate Findings and Conclusions pertaining to each broad category.

  8. For Immediate Release --Friday, September 20, 2013 Current polygamy challenges and First Nations Hydro-

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    of Norway. Both groups were affected by large-scale hydroelectric power developments challenges and First Nations Hydro- power rights in Norway and Canada: Parkland framed the implementation of hydroelectric projects on indigenous land. Though

  9. FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology

    E-Print Network [OSTI]

    Sandercock, Brett K.

    -7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institute Technology Center, National Renewable Energy Lab, karin_sinclair@nrel.gov, 303-384-6946 DOE Project Team: DOE in the performance of the award, which is protected from public release for a period of time by the terms

  10. Tampa Electric Company`s Polk Power Station Integrated Gasification Combined Cycle Project

    SciTech Connect (OSTI)

    Jenkins, S.D.; Shafer, J.R.

    1994-12-31T23:59:59.000Z

    Tampa Electric Company (TEC) is in the construction phase for the new Polk Power Station, Unit {number_sign}1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. The unit will utilize oxygen-blown entrained-flow coal gasification, along with combined cycle technology, to provide nominal net 26OMW of generation. As part of the environmental features of this process, the sulfur species in the coal will be recovered as a commercial grade sulfuric acid by-product. The sulfur will be removed from the synthesis gas utilizing a cold gas clean-up system (CGCU).

  11. Slide 1/14Fusion Power Associate Washington DC 10-11 December 2013OM13897 Status Report of the ITER Project

    E-Print Network [OSTI]

    as an independent international organization ­ Develop a process where objectives and strategy defined by the DG-General of the ITER Organization Aerial view of ITER Site in September 2013 (F4E) #12;Slide 2/14Fusion Power Associate more power than it receives; · The ITER Project creates a new collaborative culture and standard

  12. Effects of the drought on California electricity supply and demand

    E-Print Network [OSTI]

    Benenson, P.

    2010-01-01T23:59:59.000Z

    July - August - Rancho Seco 1 PG&E hydroelectric power -PG&E hydroelectric powerPG&E hydroelectric power - PG&E hydroelectric power

  13. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  14. Project Sponsor: Department of EnergyADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    OF ELECTRICITY AND H2 FROM COAL WHILE CAPTURING CO2 GOALS ∑Identify and assess advanced improvements in coal-based power plant," proceedings of the ASME IGTI Conference, Barcelona, May 2006 PERSONNEL's atmosphere that contributes to the greenhouse effect. In addition to CO2, pollutants such as oxides of sulfur

  15. The VIKING Project: An Initiative on Resilient Control of Power Networks

    E-Print Network [OSTI]

    Johansson, Karl Henrik

    --This paper presents the work on resilient and secure power transmission and distribution developed within makers can obtain instant access to critical data about the system status. Examples of important security this challenge by de- veloping cyber-physical models that specifically address the interaction between the (cyber

  16. EIS-0300: Minnesota Agri-Power Project: Biomass for Rural Development, Granite Falls, Minnesota

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE and the Minnesota Environmental Quality Boards' [MEQB, a Minnesota State agency] decision to support a proposal by the Minnesota Valley Alfalfa Producers (MnVAP) to construct and operate a 75Ė103 megawatt biomass fueled gasifier and electric generating facility, known as the Minnesota Agri-Power Plant (MAPP), and associated transmission lines and alfalfa processing facilities.

  17. Project Sponsors:ADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    provided iQ EVs to test the impact of electric car charging on the grid. RECENT PUBLICATIONS/PAPERS Heling-Use Station Car Program: Analysis of ZEV-NET in Orange County, California. In Transportation Research Board 88 Power and Energy Program (APEP) is home to 30 Scion iQ electric vehicles provided by Toyota Motor Sales

  18. New England Wind Forum: A Wind Powering America Project - Newsletter #6 - September 2010, (NEWF)

    SciTech Connect (OSTI)

    Grace, R.; Gifford, J.; Leeds, T.; Bauer, S.

    2010-09-01T23:59:59.000Z

    Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region.

  19. PROJECT REPORT Energy Management for EV Charge Station in Distributed Power System

    E-Print Network [OSTI]

    He, Lei

    of few batteries which connected to the DPS generator, super capacitors(or other energy storage device capacitors, we want to obtain an optimal battery and super capacitor discharging schedule from distributed. Then the second one is conventional power grid will only connected to super capacitors and charge them when needed

  20. Sun Valley Photovoltaic Power Project, Phase 1. Final report, June 1, 1978-February 28, 1979

    SciTech Connect (OSTI)

    Goodman, Jr, F R

    1980-03-01T23:59:59.000Z

    An application experiment was devised for fabrication, installation, operation, and evaluation of a concentrating photovoltaic system for direct conversion of sunlight to electricity. If the experiment is performed, the photovoltaic system will be connected to an electric motor load and to an electric utility system. Provisions will be made to allow the motor load to be supplied with power from either the photovoltaic system or the utility system. When the demand of the motor load is low, the photovoltaic system will deliver excess power to the utility system for use elsewhere. Thus, the experimental installation has been designed with sufficient flexibility to enable several modes of operation to be evaluated. This type of application is a typical example of on-site power generation at an individual load center involving two-way energy exchange with the adjacent utility system. Because a growing market for photovoltaic systems in this type of application is expected in the 1980's, the experiment will provide needed information in a timely manner. The experiment was devised jointly by the Los Angeles Department of Water and Power (LADWP) and its subcontractor, Spectrolab, Inc. LADWP will furnish a site and operate the equipment after installation. The subcontractor will manufacture and furnish a concentrating photovoltaic array with a power rating of approximately 200 kilowatts at one kilowatt per square meter of insolation. Other required equipment will be purchased to specification from appropriate suppliers. The photovoltaic system represents a state-of-the-art design at the time this report was prepared. However, minor design improvements may be made prior to and during system installation. All phases of fabrication, installation and operation will be documented through formal reports. The results of the experiment will contribute to the goals of the National Photovoltaic Conversion Program.

  1. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    SciTech Connect (OSTI)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22T23:59:59.000Z

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  2. Water quality and sedimentation implications of installing a hydroelectric dam on the RŪo Baker in Chilean Patagonia

    E-Print Network [OSTI]

    Leandro, Gianna Dee

    2009-01-01T23:59:59.000Z

    HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

  3. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    SciTech Connect (OSTI)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01T23:59:59.000Z

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  4. Building As Power Plant - BAPP/Invention Works Project at Carnegie Mellon University, Pittsburgh PA, USA†

    E-Print Network [OSTI]

    Hartkopf, V.; Archer, D.; Loftness, V.

    2004-01-01T23:59:59.000Z

    of Fine Arts. The building will be equipped with a decentralized energy generation system in the form of a combined heat and power plant. This will include a 250 kW Siemens Westinghouse Solid Oxide Fuel Cell (SOFC), heat recovery steam generator, steam... Photovoltaic, SOFC means Solid-Oxide Fuel Cell Energy Consumptions Compared to BAPP Data source: EIA, Commercial Building Energy Consumption Survey 1995; PG&E, Commercial Building Survey Report 1999; UK National Statistics * Germany average practice...

  5. Building As Power Plant - BAPP/Invention Works Project at Carnegie Mellon University, Pittsburgh PA, USA

    E-Print Network [OSTI]

    Hartkopf, V.; Archer, D.; Loftness, V.

    2004-01-01T23:59:59.000Z

    turbine and absorption chiller/boiler technologies. In addition, advanced photovoltaic, solar thermal, and geo-thermal systems are being considered for integration. A conceptual scheme for an ?ascending-descending energy scheme? that integrates energy... ?cascading? energy strategy designed to make maximum use of limited natural resources. In a cascading system, a fuel cell and photovoltaic panels might be bundled for the building?s power generation; reject heat from the fuel cell can be converted...

  6. The Hunters Point cogeneration project: Environmental justice in power plant siting

    SciTech Connect (OSTI)

    Kosloff, L.H. [Trexler and Associates, Inc., Portland, OR (United States); Varanini, E.E. III [Marron, Reid and Sheehy, Sacramento, CA (United States)

    1997-12-31T23:59:59.000Z

    The recent Hunters Point, San Francisco power plant siting process in California represents the first time that environmental justice has arisen as a major power plant siting issue. Intervenors argued that the siting process was racially and economically biased and were supported by leading environmental justice activists at the Golden Gate Law School`s Environmental Justice Clinic, a leading thinker in this field. The applicant argued that environmental justice charges cannot realistically be made against a modern natural-gas energy facility with state-of-the-art environmental controls. The applicant also argued that environmental justice concerns were fully addressed through the extensive environmental and socioeconomic review carried out by California Energy Commission staff. After extensive testimony and cross-examination, the Commission agreed with the applicant. This case has important lessons for companies that could be charged with environmental justice violations and environmental justice activists who must decide where to most effectively target their efforts. This paper reviews the proceeding and its lessons and makes recommendations regarding future applicability of environmental justice issues to the power generation sector. The authors represented the applicant in the facility siting proceeding.

  7. Unconventional energy - for a public-power utility

    SciTech Connect (OSTI)

    Leber, R.E.

    1982-01-01T23:59:59.000Z

    The paper describes a few of the hundreds of projects annually featured in the Public Power Innovation list published in the American Public Power Association's (APPA) Public Power magazine. These innovative approaches include feasibility studies, developments or demonstrations in the use of alternative fuels such as low-Btu corncob gas in a diesel generating set, the burning of corn waste in suitably modified steam boilers, anaerobic digestion of solid waste to produce methane, increasing the energy content of gas so produced from 350 Btu/cu ft to approximately 1000 Btu/cu ft by the Binax system, gasified peat for diesel power plants, the use of waste heat from diesel plants in a Rankine-cycle bottoming system, and the use of coal-derived liquid fuel in diesel engines. Other approaches include the phosphoric acid fuel cell, solar heating and cooling systems, photoelectric cell arrays, wind power, small low-head hydroelectric plants, and cogeneration systems. Other public electric utilities are providing free energy audits to their customers, and offering water-to-air heat pumps.

  8. SLCA/IP power alternative screening method (SPASM)

    SciTech Connect (OSTI)

    Palmer, S.C. [USDOE Western Area Power Administration, Salt Lake City, UT (United States). Salt Lake City Area Office]|[Argonne National Lab., IL (United States); Ancrile, J.D. [Argonne National Lab., IL (United States)

    1995-03-01T23:59:59.000Z

    This report describes the SLCA/IP Power Alternative Screening Method (SPASM), which was used to screen 784 possible combinations of electric power marketing alternatives and dam operational scenarios to provide a representative range for analysis in the Western Area Power Administration Salt Lake City Area Integrated Projects (SLCA/IP) Electric Power Marketing Environmental Impact Statement (EIS). Each combination consists of one energy and capacity commitment level and one operational scenario for each of the hydroelectric facilities at Glen Canyon Dam, Flaming Gorge Dam, and the Aspinall Unit. The total annual cost to the SLCA/IP firm power customers of each of the 784 combinations is estimated and included in a relative frequency distribution. A relative frequency distribution is also generated for each marketing alternative. The number of combinations is reduced to 12 by taking the mean value and endpoint value for each of four marketing alternatives. Some minor deviations from this procedure, which are made for political purposes, are explained. 9 figs., 14 tabs.

  9. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazelPennsylvania: EnergyExolis Energy JumpFAC 04-08 Jump to:FC3 Group|

  10. Projects Aimed at Advancing State-of-the-Art Carbon Capture from Coal Power

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProjectDepartmentPlants Selected for

  11. Wind for Schools Project Curriculum Brief (Fact Sheet), Wind And Water Power Program (WWPP)

    Wind Powering America (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment Activities Printable80 mPilot Project

  12. MHK Projects/Homeowner Tidal Power Elec Gen | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformationCygnet < MHKSound, NYMananBend Project

  13. Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment3311, 3312),Microgrid Workshop Report AugustPROJECT SUCCESS

  14. Legal obstacles and incentives to the development of small scale hydroelectric potential in Wisconsin

    SciTech Connect (OSTI)

    None,

    1980-05-01T23:59:59.000Z

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The initial obstacle that all developers confront in Wisconsin is obtaining the authority to utilize the bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Wisconsin follows the riparian theory of water law.

  15. Reliability of concrete in the main structures of the Boguchany hydroelectric station

    SciTech Connect (OSTI)

    Lyadov, Yu.D.; Semenok, S.N.; Sukhotskaya, S.S. [and others

    1995-11-01T23:59:59.000Z

    At the construction site of the Boguchany hydroelectric station more than half of the entire volume of concrete is being placed in the main structures. The stage related to the construction of the headwall of the water intakes and pressure conduits, formation of the downstream face, transfer of the diverted flow to the permanent bottom outlets, and start of concreting operations on the hydrostation powerhouse is coming.

  16. Sacramento Utility to Launch Concentrating Solar Power-Natural Gas Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 <Department of iiBiodieselWATER, POWER,Energythe Dynamics of|

  17. Microsoft PowerPoint - 16.1225_Terry Cooke-Davies - Project Complexity as

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015of 2005 atthe District ofInstituteMicrosoft PowerPoint -0855_Raines Draft Revof

  18. Microsoft PowerPoint - Poplawsky_2014_CNMSUserProjectHighlight_AEM.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.pptStates AOnline0,PROJECTSTo achieve

  19. Microsoft PowerPoint - Rangasamy_2014_CNMS User Project Highlight_JACS.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.pptStatesEnergyAn innovative design of

  20. Microsoft PowerPoint - River Protection Project HAB.ppt [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.pptStatesEnergyAn innovativeTank

  1. City of Glendale Water and Power Smart Grid Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, click here.TelluricPowerCity ofInformation CityIowaCityGlen

  2. Analysis of dc harmonics using the three-pulse model for the intermountain power project HVDC transmission

    SciTech Connect (OSTI)

    Dickmander, D.L.; Peterson, K.J.

    1989-04-01T23:59:59.000Z

    The harmonic analysis of the dc-side of an HVDC line transmission requires realistic models of the converters, the dc line, and other relevant equipment. These models must include all important paths for harmonic current, and appropriate sources of harmonic voltage generation. The classical converter modeling technique has been demonstrated to be insufficient in field measurements and analysis of the harmonic spectra found on recent HVDC line transmission. For this reason, a new model of the converter bridge which takes into account the major stray capacitances in the converter (the three-pulse model) has been developed, and is described in detail elsewhere. This paper presents comparisons between the classical and three-pulse calculations for the Intermountain Power Project (IPP) HVDC transmission. The calculation results from the three-pulse model agree favorably with the harmonics found in field measurements.

  3. Measuring and moderating the water resource impact of biofuel production and trade

    E-Print Network [OSTI]

    Fingerman, Kevin Robert

    2012-01-01T23:59:59.000Z

    directly † for † hydroelectricpower †generation, †but †2010). † 6.4.4 HydroelectricpowerHydroelectricity †is †with †the †most † hydroelectricpower †generation. †Data †

  4. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    E-Print Network [OSTI]

    Hoen, Ben

    2010-01-01T23:59:59.000Z

    2002) Economic Impacts of Wind Power in Kittitas County, WA.about Large Offshore Wind Power: Underlying Factors. EnergyOpinion on Offshore Wind Power - Interim Report. University

  5. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    generators entered into power purchase agreements (PPAs)take-orpay clause in its power purchase agreement. While thereceived generous power purchase agreements, but information

  6. CLIMATE CHANGE IMPACTS ON HYDROELECTRIC POWER G.P. Harrison(1),

    E-Print Network [OSTI]

    Harrison, Gareth

    of hydro. INTRODUCTION Climate change or global warming is the expected outcome of increases in atmospheric is to limit the increase in greenhouse gas concentrations by reducing emissions. As electricity production(2) (1) Energy Systems Group, Department of Electronics and Electrical Engineering, University

  7. An Assessment of the Impact of Climate Change on Hydroelectric Power

    E-Print Network [OSTI]

    Harrison, Gareth P

    Global climate change is one of the greatest challenges of the twenty-first century. Rising temperatures and alteration of weather patterns are anticipated to result from increased atmospheric concentrations of greenhouse ...

  8. The role of hydroelectric generation in electric power systems with large scale wind generation

    E-Print Network [OSTI]

    Hagerty, John Michael

    2012-01-01T23:59:59.000Z

    An increasing awareness of the operational challenges created by intermittent generation of electricity from policy-mandated renewable resources, such as wind and solar, has led to increased scrutiny of the public policies ...

  9. Introduction. The boreal forest and global change The boreal forest is the second largest biome in the

    E-Print Network [OSTI]

    Johnson, Edward A.

    of rivers to supply hydroelectric power to southern non-boreal regions does produce significant loss of forested area (e.g. the James Bay hydroelectric project in north- western Quebec involves three river

  10. Dam break risk assessment in Baker Valley (Chilean Patagonia)

    E-Print Network [OSTI]

    Natale, Elisabetta

    2009-01-01T23:59:59.000Z

    An hydroelectric project was proposed by HidroAysen Company in the Aysen Region of Chilean Patagonia. It consisted of the installation of five hydroelectric power stations, two on Rio Baker and three on Rio Pascua, with ...

  11. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects (small hydro and bagasse co-generators) andPCF) in Guatemala for a small hydro project assumes that the

  12. Managementźs Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Administration is a federal agency under the Department of Energy. BPA markets wholesale electrical power from 31 federal hydroelectric projects owned and operated by the...

  13. 3-4-10_Final_Testimony_%28WAPA%29_%28Meeks%29.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    hydroelectric power to support water project-related irrigation pumping requirements, wholesale preference power customers, and certain Federal end-use loads. Since the 1990s,...

  14. Managementźs Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and to construct transmission facilities to deliver that power. Today, BPA markets wholesale power from 31 federal hydroelectric projects, most of which are located in the...

  15. Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan

    SciTech Connect (OSTI)

    None,

    1980-05-01T23:59:59.000Z

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

  16. An Intelligent Solar Powered Battery Buffered EV Charging Station with Solar Electricity Forecasting and EV Charging Load Projection Functions

    E-Print Network [OSTI]

    Zhao, Hengbing; Burke, Andrew

    2014-01-01T23:59:59.000Z

    fast charging, and solar power availability pose a challengeevent to a fixed SOC from solar power and/or the grid in athem without considering solar power availability and the

  17. Developing a Power Measurement Framework for Cyber Defense

    E-Print Network [OSTI]

    Pouchard, Line

    substations and hydroelectric facilities is a normal part of guerilla warfare [3]. Cyber attack of EDS systems, they have become more vulnerable to cyber-attacks as well. As part of a systems health monitoring approach, Experimentation, Security. Keywords Energy Delivery Systems, malware, rootkits, cyber-attacks, Power Distribution

  18. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01T23:59:59.000Z

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generatorsí forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the ďflying brickĒ technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  19. The relationship between policy choice and the size of the policy region: Why small jurisdictions may prefer renewable energy policies to reduce CO2 emissions

    E-Print Network [OSTI]

    Accordino, Megan H.; Rajagopal, Deepak

    2012-01-01T23:59:59.000Z

    nuclear and hydroelectric power under the policy. Fullynuclear and large hydroelectric power. Nuclear and large

  20. Impacts of Avian Predation on Juvenile Salmonids in Central California Watersheds

    E-Print Network [OSTI]

    Frechette, Danielle

    2010-01-01T23:59:59.000Z

    routes because of Hydroelectric power, Habitat degradation,routes because of Hydroelectric power, Habitat degradation,

  1. Reservoir Management in Mediterranean Climates through the European Water Framework Directive

    E-Print Network [OSTI]

    O'Reilly, Clare; Silberblatt, Rafael

    2009-01-01T23:59:59.000Z

    future use, or for hydroelectric power generation (Palmierias supply, irrigation, hydroelectric power and recreation (

  2. Rethinking Downstream Regulation: California's Opportunity to Engage Households in Reducing Greenhouse Gases

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    in the winter months when hydroelectric power generation isare located and hydroelectric power generation is naturally

  3. Fabrication, Inspection, and Test Plan for the Advanced Test Reactor (ATR) High-Power Mixed-Oxide (MOX) Fuel Irradiation Project

    SciTech Connect (OSTI)

    Wachs, G. W.

    1998-09-01T23:59:59.000Z

    The Department of Energy (DOE) Fissile Disposition Program (FMDP) has announced that reactor irradiation of Mixed-Oxide (MOX) fuel is one of the preferred alternatives for disposal of surplus weapons-usable plutonium (Pu). MOX fuel has been utilized domestically in test reactors and on an experimental basis in a number of Commercial Light Water Reactors (CLWRs). Most of this experience has been with Pu derived from spent low enriched uranium (LEU) fuel, known as reactor grade (RG) Pu. The High-Power MOX fuel test will be irradiated in the Advanced Test Reactor (ATR) to provide preliminary data to demonstrate that the unique properties of surplus weapons-derived or weapons-grade (WG) plutonium (Pu) do not compromise the applicability of this MOX experience base. The purpose of the high-power experiment, in conjunction with the currently ongoing average-power experiment at the ATR, is to contribute new information concerning the response of WG plutonium under more severe irradiation conditions typical of the peak power locations in commercial reactors. In addition, the high-power test will contribute experience with irradiation of gallium-containing fuel to the database required for resolution of generic CLWR fuel design issues. The distinction between "high-power" and "average-power" relates to the position within the nominal CLWR core. The high-power test project is subject to a number of requirements, as discussed in the Fissile Materials Disposition Program Light Water Reactor Mixed Oxide Fuel Irradiation High-Power Test Project Plan (ORNL/MD/LTR-125).

  4. SECTION 21 Table of Contents 21 Spokane Subbasin Overview........................................................................2

    E-Print Network [OSTI]

    hydroelectric facilities. The six dams (from upstream to downstream) include Post Falls in Idaho, Upper Falls to collectively as the Spokane River Hydroelectric Project. The Spokane River Hydroelectric Project operates to maximize power generation to meet local and regional electricity demands with consideration given to flood

  5. Power Systems Past Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical Information STIP Map DocumentRates > HelpstartPast

  6. Analysis of environmental issues related to small-scale hydroelectric development. I. Dredging

    SciTech Connect (OSTI)

    Loar, J.M.; Dye, L.L.; Turner, R.R.; Hildebrand, S.G.

    1980-07-01T23:59:59.000Z

    The small hydroelectric potential (less than or equal to 15-MW capacity) at existing dams in the US has been estimated to be approximately 5000 MW. Development of this resource by retrofitting these dams for hydroelectric generation may require dredging in order to (1) reclaim reservoir storage capacity lost as a result of sediment accumulation; (2) clear intake structures; and/or (3) construct/repair powerhouses, tailraces, and headraces. Dredging and disposal of dredged material at small-scale hydro sites may result in several potential environmental impacts, and their magnitude will depend upon many site-specific factors. The physical and chemical effects of dredging and disposal, their causes, and the biological effects engendered by these physical and chemical changes are discussed. Factors that could affect the severity (magnitude) of these effects (impacts) are emphasized, with the intent of providing guidance to developers of potential sites. A discussion of environmental contraints and mitigation, as well as guidelines for the early evaluation of the environmental feasibility of dredging, are included. A general introduction is provided on dredging equipment and disposal practices, with emphasis on those practices that would be applicable to small reservoirs. Regulations applicable to dredged material disposal and wetlands protection are discussed, and a preliminary analysis of the economic costs associated with dredging and disposal is presented.

  7. Can Fish Morphological Characteristics be Used to Re-design Hydroelectric Turbines?

    SciTech Connect (OSTI)

    Cada, G. F.; Richmond, Marshall C.

    2011-07-19T23:59:59.000Z

    Safe fish passage affects not only migratory species, but also populations of resident fish by altering biomass, biodiversity, and gene flow. Consequently, it is important to estimate turbine passage survival of a wide range of susceptible fish. Although fish-friendly turbines show promise for reducing turbine passage mortality, experimental data on their beneficial effects are limited to only a few species, mainly salmon and trout. For thousands of untested species and sizes of fish, the particular causes of turbine passage mortality and the benefits of fish-friendly turbine designs remain unknown. It is not feasible to measure the turbine-passage survival of every species of fish in every hydroelectric turbine design. We are attempting to predict fish mortality based on an improved understanding of turbine-passage stresses (pressure, shear stress, turbulence, strike) and information about the morphological, behavioral, and physiological characteristics of different fish taxa that make them susceptible to the stresses. Computational fluid dynamics and blade strike models of the turbine environment are re-examined in light of laboratory and field studies of fish passage effects. Comparisons of model-predicted stresses to measured injuries and mortalities will help identify fish survival thresholds and the aspects of turbines that are most in need of re-design. The coupled model and fish morphology evaluations will enable us to make predictions of turbine-passage survival among untested fish species, for both conventional and advanced turbines, and to guide the design of hydroelectric turbines to improve fish passage survival.

  8. Response of spawning lake sturgeons to change in hydroelectric facility operation

    SciTech Connect (OSTI)

    Auer, N.A. [Michigan Technological Univ., Houghton, MI (United States)

    1996-01-01T23:59:59.000Z

    Spawning of lake sturgeon Acipenser fulvescens was documented from 1987 to 1992 below the Prickett hydroelectric facility on the Sturgeon River, a tributary to Portage Lake, Michigan. Lake sturgeons were captured at the spawning site with dip nets during periods of reduced flow. A change in the spawning characteristics of the population was noted that corresponded to a changed in the operation of the hydroelectric facility. In 1987 and 1988 the facility operated in a peaking mode, which resulted in large daily fluctuations in river flows. The years 1989 and 1990 were years of transition, and in 1991 and 1992 the facility released near run-of-the-river (ROR) flows. Under near-ROR flows, which were more natural, adult lake sturgeons spent 4-6 weeks less at the spawning sites, 74% more fish were observed, weights were greater due to a 68% increase in number of females, and fish had increased reproductive readiness. The change in flow regime was the result of a Federal Energy Regulatory Commission relicensing action. The positive response observed in lake sturgeon spawning activity that resulted from the change of facility operation to near-ROR flows should be beneficial to the survival and perpetuation of this population. Similar results may be experienced in other lake sturgeon waters affected by manipulated flow regimes. 28 refs., 5 figs., 6 tabs.

  9. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    SciTech Connect (OSTI)

    Hoen, Ben; Wiser, Ryan; Cappers, Peter; Thayer, Mark; Sethi, Gautam

    2009-12-02T23:59:59.000Z

    With wind energy expanding rapidly in the U.S. and abroad, and with an increasing number of communities considering wind power development nearby, there is an urgent need to empirically investigate common community concerns about wind project development. The concern that property values will be adversely affected by wind energy facilities is commonly put forth by stakeholders. Although this concern is not unreasonable, given property value impacts that have been found near high voltage transmission lines and other electric generation facilities, the impacts of wind energy facilities on residential property values had not previously been investigated thoroughly. The present research collected data on almost 7,500 sales of singlefamily homes situated within 10 miles of 24 existing wind facilities in nine different U.S. states. The conclusions of the study are drawn from eight different hedonic pricing models, as well as both repeat sales and sales volume models. The various analyses are strongly consistent in that none of the models uncovers conclusive evidence of the existence of any widespread property value impacts that might be present in communities surrounding wind energy facilities. Specifically, neither the view of the wind facilities nor the distance of the home to those facilities is found to have any consistent, measurable, and statistically significant effect on home sales prices. Although the analysis cannot dismiss the possibility that individual homes or small numbers of homes have been or could be negatively impacted, it finds that if these impacts do exist, they are either too small and/or too infrequent to result in any widespread, statistically observable impact.

  10. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-06-16T23:59:59.000Z

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  11. Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project

    SciTech Connect (OSTI)

    Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

    1983-06-30T23:59:59.000Z

    A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

  12. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    E-Print Network [OSTI]

    Hoen, Ben

    2010-01-01T23:59:59.000Z

    Offshore Wind Power: Underlying Factors. Energy Policy. 35(Wind Development on Local Property Values. Renewable Energy Policy

  13. Environmental impact statement/state analysis report. Cedar Bay Cogeneration Project, Jacksonville, Florida (EPA and FDER). Including Technical Appendix. Draft report. [Independent Power Generation

    SciTech Connect (OSTI)

    Not Available

    1990-05-01T23:59:59.000Z

    AES/Cedar Bay, Inc. proposes to construct and operate a cogeneration facility on and existing industrial site within the North District of Duval County, approximately eight miles north of Jacksonville, Florida. The plant will produce 225 megawatts of electricity for sale to Florida Power and Light Company. In addition, steam will be sold to the adjacent Seminole Kraft Corporation paper mill. The document, prepared pursuant to the National Environmental Policy Act, assesses the proposed project and alternatives with respect to impacts on the natural and man-made environments. Potential mitigative measures are also evaluated. The Technical Appendix includes a copy of U.S. EPA's draft National Pollutant Discharge Elimination System permit, FDER's Conditions of Power Plant Siting Certification, as well as other state agency reports pertinent to the proposed project.

  14. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2002 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Ballinger, Dean; Kamps, Jeffrey W. (Pacific States Marine Fisheries Commission, Gladstone, OR)

    2003-02-01T23:59:59.000Z

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River. The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to monitor the timing and magnitude of the juvenile salmonid out-migration in the Columbia Basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time and survival estimates and to build a time series data set for future reference. The purpose of the PSMFC portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville dams.

  15. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2012-01-01T23:59:59.000Z

    Trends in Tax Equity for Renewable Energy. Ē Project Financefirms/ _________. 2010b. ďRenewable Energy Money Still GoingGrant Program on Renewable Energy Deployment in 2009. LBNL-

  16. PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    A10. Net Value of ITC for Landfill Gas (10% Nominal Discountbiomass, geothermal, landfill gas, municipal solid waste,biomass, geothermal, and landfill gas projects. Section 4

  17. PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    A10. Net Value of ITC for Landfill Gas (10% Nominal Discountopen-loop biomass, geothermal, landfill gas, municipal solidbiomass, geothermal, and landfill gas projects. Section 4

  18. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2012-01-01T23:59:59.000Z

    Trends in Tax Equity for Renewable Energy. Ē Project Financefirms/ _________. 2010b. ďRenewable Energy Money Still GoingTreasury Grant Program on Renewable Energy Deployment in

  19. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects. Several bagasse cogeneration and hydroprojects (small hydro and bagasse co-generators) and 201 MWgrid. These facilities burn bagasse when it is available and

  20. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    E-Print Network [OSTI]

    Hoen, Ben

    2010-01-01T23:59:59.000Z

    such concern is the potential impact of wind energy projectshas investigated the potential impact of wind projects onassessment of the potential impact of wind facilities on the

  1. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    SciTech Connect (OSTI)

    Casey, Daniel; Malta, Patrick

    1990-12-01T23:59:59.000Z

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scale losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.

  2. Southwestern Power Administration Annual Report 2008

    SciTech Connect (OSTI)

    none,

    2010-12-01T23:59:59.000Z

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers Ė nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwesternís safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  3. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2012-01-01T23:59:59.000Z

    the single new solar thermal electric plant, 5 none of theequipment) Solar Thermal Electric (new plant) Wind (Small)operating solar thermal power tower plant in the United

  4. Lompoc City Council Agenda Item City Council Meeting Date: December 6, 2011

    E-Print Network [OSTI]

    hydroelectric projects, along with power purchases from the Western Area Power Administration's Sierra Nevada through ownership in Northern California Power Agency ("NCPA") geothermal generation projects and small Region ("Western") small hydroelectric generation projects. Senate Bill SBX1-2 was signed by Governor

  5. Electric Power Monthly, August 1990. [Glossary included

    SciTech Connect (OSTI)

    Not Available

    1990-11-29T23:59:59.000Z

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  6. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    SciTech Connect (OSTI)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01T23:59:59.000Z

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  7. (Bradfield Electric and Alaska Power Authority Presidential permit): Finding of no significant impact (FONSI)

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The Economic Regulatory Administration (ERA) of the Department of Energy (DOE) is considering an application by Bradfield Electric, Inc. (Bradfield), and the Alaska Power Authority (APA) for a Presidential permit to construct, operate, maintain and connect a 69-kilovolt (kV) transmission line which would extend from the APA's Tyee Lake Hydroelectric Power Project located near Wrangell, Alaska, to a point on the US-Canadian international border just east of the South Fork Craig River. The DOE has reviewed an environmental assessment (EA) prepared by the US Forest Service (USFS) in connection with its issuance of a special use permit to construct the proposed line through the Tongass National Forest. Based on this EA, the USFS issued a decision notice and a finding of no significant impact (FONSI) for the proposed project on May 9, 1988. The DOE is adopting this EA as DOE/EA-0375 in partial satisfaction of its responsibilities under the National Environmental Policy Act of 1969 (NEPA) regarding the issuance of a Presidential permit.

  8. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    SciTech Connect (OSTI)

    Dismukes, E.B.

    1994-10-20T23:59:59.000Z

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  9. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    E-Print Network [OSTI]

    Bolinger, Mark

    2012-01-01T23:59:59.000Z

    the 10 GW of new wind capacity installed in the U.S. in 2009of large wind power capacity installed in the U.S. in 2009estimates of new capacity installed in 2009, the following

  10. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    de?ne as all heavy and distillate fuel oil plants. Theirengines burning heavy fuel oil, whereas prior to that, theit is available and heavy fuel oil for supplying power to

  11. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    E-Print Network [OSTI]

    Hoen, Ben

    2010-01-01T23:59:59.000Z

    2002) Economic Impacts of Wind Power in Kittitas County, WA.Beck, D. (2004) How Hull Wind "I" Impacted Property Valuesof Visual Impact: The Case of Wind Turbines. Environment and

  12. Project Title: Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation

    SciTech Connect (OSTI)

    Clark, Thomas M [Principal Investigator; Erlach, Celeste [Communications Mgr.

    2014-12-30T23:59:59.000Z

    Demonstrate the technical and economic feasibility of small scale power generation from low temperature co-produced fluids. Phase I is to Develop, Design and Test an economically feasible low temperature ORC solution to generate power from lower temperature co-produced geothermal fluids. Phase II &III are to fabricate, test and site a fully operational demonstrator unit on a gold mine working site and operate, remotely monitor and collect data per the DOE recommended data package for one year.

  13. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1984-10-01T23:59:59.000Z

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  14. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    SciTech Connect (OSTI)

    None,

    1980-05-01T23:59:59.000Z

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  15. Commission decision on the Northern California Power Agency's Application for Certification for Geothermal Project No. 2. Docket 79-AFC-2

    SciTech Connect (OSTI)

    Not Available

    1980-03-01T23:59:59.000Z

    The text of the Decision is presented in narrative form. Included are: findings on compliance with statutory site certification requirements, a discussion of the Joint Environmental Study and its significance in terms of the California Environmental Quality and National Environmental Policy Acts, a brief recapitulation of the procedural steps which occurred, and a summary of the evidentiary bases for this Decision. Also presented are topical discussions on the various human and natural environmental areas impacted by the project, as well as the technical, engineering, and other areas of concern affected by the project. These topical discussions summarize the basis for the Commission's ultimte Findings and Conclusions pertaining to each broad cetegory. (MHR)

  16. DISTRIBUTED ENERGY SYSTEMS IN CALIFORNIA'S FUTURE: A PRELIMINARY REPORT, VOLUME I

    E-Print Network [OSTI]

    Authors, Various

    2010-01-01T23:59:59.000Z

    and Solar Thermal Hydroelectric Power Geothermal . Land UsePower Commission, Hydroelectric Power Resources of theSTORAGE RESOURCES Hydroelectric power comprises, after oil-

  17. EA-1916: Ocean Renewable Power Company Maine, LLC Cobscook Bay Tidal Energy Pilot Project, Cobscook in Washington County, Maine

    Broader source: Energy.gov [DOE]

    Draft Environmental AssessmentThis EA evaluates the environmental impacts of a project that would use the tidal currents of Cobscook Bay to generate electricity via cross-flow Kinetic System turbine generator units (TGU) mounted on the seafloor. The TGUs would capture energy from the flow in both ebb and flood directions.

  18. National Account Energy Alliance Final Report for the Ritz Carlton, San Francisco Combined Heat and Power Project

    SciTech Connect (OSTI)

    Rosfjord, Thomas J [UTC Power

    2007-11-01T23:59:59.000Z

    Under collaboration between DOE and the Gas Technology Institute (GTI), UTC Power partnered with Host Hotels and Resorts to install and operate a PureComfort 240M Cooling, Heating and Power (CHP) System at the Ritz-Carlton, San Francisco. This packaged CHP system integrated four microturbines, a double-effect absorption chiller, two fuel gas boosters, and the control hardware and software to ensure that the system operated predictably, reliably, and safely. The chiller, directly energized by the recycled hot exhaust from the microturbines, could be configured to provide either chilled or hot water. As installed, the system was capable of providing up to 227 kW of net electrical power and 142 RT of chilled water at a 59F ambient temperature.

  19. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    SciTech Connect (OSTI)

    Not Available

    1992-08-01T23:59:59.000Z

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

  20. Microsoft PowerPoint - Gao_2014_CINT-CNMS User Project Highlight_AngewChemie [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.ppt Microsoft PowerPoint -March 26 -Graphene

  1. Microsoft PowerPoint - Gong_CNMS User Project Highlight_NanoLett.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.ppt Microsoft PowerPoint -MarchDopant atoms

  2. Microsoft PowerPoint - HVBPL Project Summary_Renz_APPROVED_2009_08_10.ppt [Last saved by user]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.ppt Microsoft PowerPointAlternativeHV HVBPL

  3. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    , fish passage, hatcheries, wildlife and recreation. #12;TACOMA POWER'S CUSHMAN HYDROELECTRIC PROJECT SUBJECT: Briefing on Relicensing of Tacoma's Cushman Hydro Project Tacoma Power owns and operates the Cushman Hydroelectric project, located on the Skokomish River near Hood Canal on the Olympic Peninsula

  4. Monitoring peak power and cooling energy savings of shade trees and white surfaces in the Sacramento Municipal Utility District (SMUD) service area: Project design and preliminary results

    SciTech Connect (OSTI)

    Akbari, H.; Bretz, S.; Hanford, J.; Rosenfeld, A.; Sailor, D.; Taha, H. [Lawrence Berkeley Lab., CA (United States); Bos, W. [Sacramento Municipal Utility District, CA (United States)

    1992-12-01T23:59:59.000Z

    Urban areas in warm climates create summer heat islands of daily average intensity of 3--5{degrees}C, adding to discomfort and increasing air-conditioning loads. Two important factors contributing to urban heat islands are reductions in albedo (lower overall city reflectance) and loss of vegetation (less evapotranspiration). Reducing summer heat islands by planting vegetation (shade trees) and increasing surface albedos, saves cooling energy, allows down-sizing of air conditioners, lowers air-conditioning peak demand, and reduces the emission of CO{sub 2} and other pollutants from electric power plants. The focus of this multi-year project, jointly sponsored by SMUD and the California Institute for Energy Efficiency (CIEE), was to measure the direct cooling effects of trees and white surfaces (mainly roofs) in a few buildings in Sacramento. The first-year project was to design the experiment and obtain base case data. We also obtained limited post retrofit data for some sites. This report provides an overview of the project activities during the first year at six sites. The measurement period for some of the sites was limited to September and October, which are transitional cooling months in Sacramento and hence the interpretation of results only apply to this period. In one house, recoating the dark roof with a high-albedo coating rendered air conditioning unnecessary for the month of September (possible savings of up to 10 kWh per day and 2 kW of non-coincidental peak power). Savings of 50% relative to an identical base case bungalow were achieved when a school bungalow`s roof and southeast wall were coated with a high-albedo coating during the same period. Our measured data for the vegetation sites do not indicate conclusive results because shade trees were small and the cooling period was almost over. We need to collect more data over a longer cooling season in order to demonstrate savings conclusively.

  5. Screening evaluation of radionuclide groundwater concentrations for the end state basement fill model Zion Nuclear Power Station decommissioning project

    SciTech Connect (OSTI)

    Sullivan T.

    2014-06-09T23:59:59.000Z

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made.

  6. New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)

    SciTech Connect (OSTI)

    Grace, R. C.; Gifford, J.

    2010-01-01T23:59:59.000Z

    Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

  7. Wind power and Wind power and

    E-Print Network [OSTI]

    Wind power and the CDM #12; Wind power and the CDM Emerging practices in developing wind power 2005 Jyoti P. Painuly, Niels-Erik Clausen, JÝrgen Fenhann, Sami Kamel and Romeo Pacudan #12; WIND POWER AND THE CDM Emerging practices in developing wind power projects for the Clean Development Mechanism Energy

  8. Methodological and Practical Considerations for DevelopingMultiproject Baselines for Electric Power and Cement Industry Projects inCentral America

    SciTech Connect (OSTI)

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion,Kristel

    2004-09-02T23:59:59.000Z

    The Lawrence Berkeley National Laboratory (Berkeley Lab) andthe Center for Sustainable Development in the Americas (CSDA) conductedtechnical studies and organized two training workshops to developcapacity in Central America for the evaluation of climate changeprojects. This paper describes the results of two baseline case studiesconducted for these workshops, one for the power sector and one for thecement industry, that were devised to illustrate certain approaches tobaseline setting. Multiproject baseline emission rates (BERs) for themain Guatemalan electricity grid were calculated from 2001 data. Inrecent years, the Guatemalan power sector has experienced rapid growth;thus, a sufficient number of new plants have been built to estimateviable BERs. We found that BERs for baseload plants offsetting additionalbaseload capacity ranged from 0.702 kgCO2/kWh (using a weighted averagestringency) to 0.507 kgCO2/kWh (using a 10th percentile stringency),while the baseline for plants offsetting load-followingcapacity is lowerat 0.567 kgCO2/kWh. For power displaced from existing load-followingplants, the rate is higher, 0.735 kgCO2/kWh, as a result of the age ofsome plants used for meeting peak loads and the infrequency of their use.The approved consolidated methodology for the Clean Development Mechanismyields a single rate of 0.753 kgCO2/kWh. Due to the relatively smallnumber of cement plants in the region and the regional nature of thecement market, all of Central America was chosen as the geographicboundary for setting cement industry BERs. Unfortunately, actualoperations and output data were unobtainable for most of the plants inthe region, and many data were estimated. Cement industry BERs rangedfrom 205 kgCO2 to 225 kgCO2 per metric ton of cement.

  9. ELECTRICAL LOAD MANAGEMENT FOR THE CALIFORNIA WATER SYSTEM

    E-Print Network [OSTI]

    Krieg, B.

    2010-01-01T23:59:59.000Z

    sections of aqueducts. Hydroelectric power generated withinthe CVP generates only hydroelectric power, its By importingthe peaking power is supplied by hydroelectric plants, the

  10. Water and Energy Interactions

    E-Print Network [OSTI]

    McMahon, James E.

    2013-01-01T23:59:59.000Z

    ecosystems (40, Hydroelectric power generation is currentlycould be allocated to hydroelectric power generation becausefarmland. Its eight hydroelectric power plants and one coal-

  11. Coupling Renewable Energy Supply with Deferrable Demand

    E-Print Network [OSTI]

    Papavasiliou, Anthony

    2011-01-01T23:59:59.000Z

    systems absorb large amounts of hydroelectric power. Duringthat snow melts and hydroelectric power supply increases andfrom hydroelectric dams or discards renewable power [53].

  12. Life-Cycle Water Impacts of U.S. Transportation Fuels

    E-Print Network [OSTI]

    Scown, Corinne Donahue

    2010-01-01T23:59:59.000Z

    the production of hydroelectric power also results in waterthe reduction in hydroelectric power production as a resultafter factoring in its hydroelectric power generation (189),

  13. The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh

    E-Print Network [OSTI]

    Crow, Ben; Singh, Nirvikar

    2009-01-01T23:59:59.000Z

    in the promotion of hydroelectric power is not known. Bothwas primarily focused on hydroelectric power coming from theirrigation and hydroelectric power generation schemes better

  14. Cap-and-Trade Modeling and Analysis: Congested Electricity Market Equilibrium

    E-Print Network [OSTI]

    Limpaitoon, Tanachai

    2012-01-01T23:59:59.000Z

    firm 10 withholds hydroelectric power and completelyby increasing hydroelectric power. Nonetheless, firm 10slightly more of its hydroelectric power to fulfill firm 3ís

  15. Nurture over nature: Summer germinating Lupinus nanus are a result of anthropogenic germination cues and are not an independently evolving population

    E-Print Network [OSTI]

    Morris, Veronica Ruth Franco

    2009-01-01T23:59:59.000Z

    water is used for hydroelectric power and irrigation duringwater is used for hydroelectric power and irrigation duringis used to generate hydroelectric power, and refilling at

  16. Essays in Applied Microeconomics

    E-Print Network [OSTI]

    Severnini, Edson Roberto

    2013-01-01T23:59:59.000Z

    to World War I, hydroelectric power development was mostly awhen necessary at hydroelectric power sites." (Billington,iii Chapter 1 The Power of Hydroelectric Dams: Agglomeration

  17. A Water Conservation Scenario for the Residential and Industrial Sectors in California: Potential Saveings of Water and Related Energy

    E-Print Network [OSTI]

    Benenson, P.

    2010-01-01T23:59:59.000Z

    energy was supplied by hydroelectric power. needed for powerprovide flood control, hydroelectric power, and But they arewas generated by hydroelectric power. is also needed for

  18. Prioritizing Climate Change Mitigation Alternatives: Comparing Transportation Technologies to Options in Other Sectors

    E-Print Network [OSTI]

    Lutsey, Nicholas P.

    2008-01-01T23:59:59.000Z

    large conventional hydroelectric power, municipal solidconventional large hydroelectric power in the percentage).large conventional hydroelectric power is not included (this

  19. Distributed Energy Systems in California's Future: A Preliminary Report Volume 2

    E-Print Network [OSTI]

    Balderston, F.

    2010-01-01T23:59:59.000Z

    and Solar Thermal Hydroelectric Power Geothermal Land Useimplications, hydroelectric power may be classified intodisadvantage In by hydroelectric power is the limited life

  20. Microsoft PowerPoint - Li_2014_CNMSUserProjectHighlight_NanoLett_BRS_BGS.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.ppt MicrosoftDOE'sR.G. Van deThe existence

  1. Microsoft PowerPoint - Ma_2014_CNMS User Project Highlight_EnergyEnvironSci.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand RetrievalsFinalModule8.ppt MicrosoftDOE'sR.G.Hydrokinetic

  2. Electricity for road transport, flexible power systems and wind...

    Open Energy Info (EERE)

    for road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and...

  3. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    SciTech Connect (OSTI)

    Rutledge, G.; Lane, D.; Edblom, G.

    1980-01-01T23:59:59.000Z

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distance transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)

  4. Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309

    SciTech Connect (OSTI)

    Anderson, K.

    2012-04-01T23:59:59.000Z

    This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

  5. Stochastic optimization of hydroelectric dam operations on the Biobio River in Chile

    E-Print Network [OSTI]

    Burrall, Kristen M

    2009-01-01T23:59:59.000Z

    Growing electricity demand in Chile has prompted the proposal of new hydropower projects. In addition to evaluating new projects to satisfy demand, a holistic assessment of alternatives as well as potential gains from ...

  6. ORGANIZATIONAL, INTERFACE AND FINANCIAL BARRIERS TO THE COMMERCIAL DEVELOPMENT OF COMMUNITY ENERGY SYSTEMS

    E-Print Network [OSTI]

    Schladale, R.

    2010-01-01T23:59:59.000Z

    wind power Low-head hydroelectric power Biomass conversiononly such source is hydroelectric power, which could lead to

  7. Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-09-01T23:59:59.000Z

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generatorsí forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system ďbreaking pointsĒ, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

  8. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    SciTech Connect (OSTI)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13T23:59:59.000Z

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. M

  9. An Empirical Model of Imperfect Dynamic Competition and Application to Hydroelectricity Storage

    E-Print Network [OSTI]

    Liski, Matti

    2008-01-01T23:59:59.000Z

    The Nordic power market presents a unique opportunity for testing the nature and degree of market power in storage behavior due to preciseness of data on market fundamentals determining hydro resource use. We develop an ...

  10. Appendix 18 Excerpt from Return to the River, Chatper 5 (Williams et al.

    E-Print Network [OSTI]

    in the Columbia River Ecosystem. Northwest Power Planning Council Document 2000-12. Northwest Power Planning is one of the larger rivers of the world and also one of the most developed with ten major hydroelectric mainstems showing the major hydroelectric projects and the owner-operator of each project. #12;RETURN

  11. Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.

    SciTech Connect (OSTI)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B; Decision and Information Sciences; Western Area Power Administration

    2010-07-31T23:59:59.000Z

    On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

  12. Dispersed power and renewables

    SciTech Connect (OSTI)

    O`Sullivan, J.B.

    1995-12-31T23:59:59.000Z

    Distributed power generation and renewable energy sources are discussed: The following topics are discussed: distributed resources, distributed generation, commercialization requirements, biomass power, location of existing biomass feedstocks, biomass business plan components, North Carolina BGCC partnership, New York biomass co-firing project, alfalfa for power and feed, Hawaii Pioneer Mill LOI project, next steps for biomass, wind power activity, photovoltaic modules and arrays, lead-acid batteries, superconducting magnetic energy storage, fuel cells, and electric power industry trends.

  13. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    McGowan, Vance

    2003-08-01T23:59:59.000Z

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Planting 31,733 plants along 3.7 stream miles, (4) Establishing 71 new photopoints and retaking 254 existing photopoint pictures; (5) Monitoring stream temperatures at 12 locations on 6 streams; (6) Completing riparian fence, water gap and other maintenance on 100.5 miles of project fences. Since initiation of the project in 1984 over 68.7 miles of anadromous fish bearing streams and 1,933 acres of habitat have been protected, enhanced and maintained.

  14. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect (OSTI)

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17T23:59:59.000Z

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides ancillary services within its own balancing authority. The relationship between BPA and SCL creates a unique opportunity to create DR programs that address both BPA's and SCL's markets simultaneously. Although simultaneously addressing both market could significantly increase the value of DR programs for BPA, SCL, and the end user, establishing program parameters that maximize this value is challenging because of complex contractual arrangements and the absence of a central Independent System Operator or Regional Transmission Organization in the northwest.

  15. Energy Department Announces Projects to Advance Cost-Effective...

    Office of Environmental Management (EM)

    Projects to Advance Cost-Effective Concentrating Solar Power Systems Energy Department Announces Projects to Advance Cost-Effective Concentrating Solar Power Systems May 21, 2014 -...

  16. Managementźs Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for that power. Today, BPA markets wholesale power from 31 federal hydroelectric projects, most of which are located in the Columbia River Basin. BPA also markets power from Energy...

  17. Managementźs Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to deliver that power. Today, BPA markets wholesale power from 31 federal hydroelectric projects, most of which are located in the Columbia River Basin. BPA also markets power from...

  18. Proposed changes to generating capacity 1980-1989 for the contiguous United States: as projected by the Regional Electric Reliability Councils in their April 1, 1980 long-range coordinated planning reports to the Department of Energy

    SciTech Connect (OSTI)

    None

    1980-12-01T23:59:59.000Z

    The changes in generating capacity projected for 1980 to 1989 are summarized. Tabulated data provide summaries to the information on projected generating unit construction, retirements, and changes, in several different categories and groupings. The new generating units to be completed by the end of 1989 total 699, representing 259,490 megawatts. This total includes 10 wind power and one fuel cell installations totaling 48.5 MW to be completed by the end of 1989. There are 321 units totaling 13,222 MW to be retired. There are capacity changes due to upratings and deratings. Summary data are presented for: total requirement for electric energy generation for 1985; hydroelectric energy production for 1985; nuclear energy production for 1985; geothermal and other energy production for 1985; approximate non-fossil generation for 1985; range of fossil energy requirements for 1985; actual fossil energy sources 1974 to 1979; estimated range of fossil fuel requirements for 1985; coal capacity available in 1985; and computation of fuel use in 1985. Power plant capacity factors are presented. Extensive data on proposed generating capacity changes by individual units in the 9 Regional Electric Reliability Councils are presented.

  19. Opportunities to change development pathways toward lower greenhouse gas emissions through energy efficiency

    E-Print Network [OSTI]

    Sathaye, Jayant

    2010-01-01T23:59:59.000Z

    development of hydroelectric power. Energy, 20(10), 977Ė981.plants in place of hydroelectric power for instance, but

  20. Sharing the burden of climate change stabilization: An energy sector perspective

    E-Print Network [OSTI]

    Wagner, Fabian; Sathaye, Jayant

    2006-01-01T23:59:59.000Z

    generation from hydroelectric power plants, wind and solarWe also observe more hydroelectric power being used in the

  1. Strategic Information Acquisition and Mixed Judicial Panels (co-authored with Matthew Spitzer of USC Law School)

    E-Print Network [OSTI]

    Talley, Eric

    2009-01-01T23:59:59.000Z

    a pumped storage hydroelectric power plant on the Hudsonrather than using hydroelectric power 28 and the relocation

  2. Aluminum across the Americas: Caribbean Mobilities and Transnational American Studies

    E-Print Network [OSTI]

    Sheller, Mimi

    2013-01-01T23:59:59.000Z

    zinc, bauxite, and the hydroelectric power needed to smeltthe Afobaka hydroelectric dam to power an aluminum smelter

  3. Sectoral trends in global energy use and greenhouse gas emissions

    E-Print Network [OSTI]

    2006-01-01T23:59:59.000Z

    on significant levels of hydroelectric power have a lowerhas a high share of hydroelectric power has the lowest CO 2

  4. Left, Right, and Center: Strategic Information Acquisition and Diversity in Judicial Panels

    E-Print Network [OSTI]

    Spitzer, Matthew L; Talley, Eric

    2011-01-01T23:59:59.000Z

    a pumped storage hydroelectric power plant on the Hudsonrather than using hydroelectric power 32 and the relocation

  5. Distribution and movement of domestic rainbow trout, Oncorhynchus mykiss, during pulsed flows in the South Fork American River, California

    E-Print Network [OSTI]

    2010-01-01T23:59:59.000Z

    the night, as part of hydroelectric power generation by theto manage water for hydroelectric power generation. There

  6. The Transition to a Carbon-Neutral Energy Economy: Exploring UCSD's Role

    E-Print Network [OSTI]

    2006-01-01T23:59:59.000Z

    on the amount of hydroelectric power that can be produced.supply of hydropower. Hydroelectric power has significant

  7. Achieving Sustainability inCaliforniaís CentralValley

    E-Print Network [OSTI]

    Lubell, Mark; Beheim, Bret; Hillis, Vicken; Handy, Susan L.

    2009-01-01T23:59:59.000Z

    solar, wind, and hydroelectric power. The goal is to be ablesolar, wind, and hydroelectric power. Barriers and Catalysts

  8. Western Area Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development...

  9. Alabama Power- UESC Activities

    Broader source: Energy.gov [DOE]

    Presentationógiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingódiscusses Alabama Power and its utility energy service contract (UESC) projects and activities.

  10. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  11. ADEPT: Efficient Power Conversion

    SciTech Connect (OSTI)

    None

    2011-01-01T23:59:59.000Z

    ADEPT Project: In todayís increasingly electrified world, power conversionóthe process of converting electricity between different currents, voltage levels, and frequenciesóforms a vital link between the electronic devices we use every day and the sources of power required to run them. The 14 projects that make up ARPA-Eís ADEPT Project, short for ďAgile Delivery of Electrical Power Technology,Ē are paving the way for more energy efficient power conversion and advancing the basic building blocks of power conversion: circuits, transistors, inductors, transformers, and capacitors.

  12. Wind Farm Monitoring at Lake Benton II Wind Power Project - Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-08-275

    SciTech Connect (OSTI)

    Gevorgian, V.

    2014-06-01T23:59:59.000Z

    Long-term, high-resolution wind turbine and wind power plant output data are important to assess the impact of wind power on grid operations and to derive meaningful statistics for better understanding of the variability nature of wind power. These data are used for many research and analyses activities consistent with the Wind Program mission: Establish a database of long-term wind power similar to other long-term renewable energy resource databases (e.g. solar irradiance and hydrology); produce meaningful statistics about long-term variation of wind power, spatial and temporal diversity of wind power, and the correlation of wind power, other renewable energy resources, and utility load; provide high quality, realistic wind power output data for system operations impact studies and wind plant and forecasting model validation.

  13. Electricity storage for short term power system service (Smart...

    Open Energy Info (EERE)

    storage for short term power system service (Smart Grid Project) Jump to: navigation, search Project Name Electricity storage for short term power system service Country Denmark...

  14. Third-Party Financing and Power Purchase Agreements for Public...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third-Party Financing and Power Purchase Agreements for Public Sector PV Projects Third-Party Financing and Power Purchase Agreements for Public Sector PV Projects Provides an...

  15. Sixth Northwest Conservation and Electric Power Plan Chapter 11: Climate Change Issues

    E-Print Network [OSTI]

    demand and change precipitation patterns, river flows, and hydroelectric generation. Second, policies-reduction goals. The issue of potential changes to electricity demand and hydroelectric generation is discussed

  16. This project is funded by an MIT Martin Family Fellowship and a MITEI Seed Fund Grant Leveraging High Performance Computation for Statistical Wind Power Prediction

    E-Print Network [OSTI]

    High Performance Computation for Statistical Wind Power Prediction Cy Chan*, James Stalker**, Alan for wind power forecasting is becoming imperative as wind energy becomes a larger contributor to the energy learning techniques for improving wind power prediction, with the goal of finding better ways to deliver

  17. Nuclear Power 2010 Program: Combined Construction and Operating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined...

  18. Projection screen having reduced ambient light scattering

    DOE Patents [OSTI]

    Sweatt, William C. (Albuquerque, NM)

    2010-05-11T23:59:59.000Z

    An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.

  19. Associate Professor of Anthropology Project Title: Global Philanthropic Networks

    E-Print Network [OSTI]

    Saldin, Dilano

    INGRID JORDT Associate Professor of Anthropology Project Title: The Power of People-to- People Networks

  20. Legal obstacles and incentives to the third development of small-scale hydroelectric potential in the six New England states: executive summary

    SciTech Connect (OSTI)

    None,

    1980-05-01T23:59:59.000Z

    This executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities. It also highlights important features of the constitutional law, statutory law, case law, and regulations of each of the six New England states. The summary may serve as a concise overview of and introduction to the detailed reports prepared by the Energy Law Institute on the legal and regulatory systems of each of the six states. The dual regulatory system is a function of the federalist nature of our government. This dual system is examined from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development. The regulation of small dams are discussed and flow diagrams of the regulations are presented for each of the six states - Maine, Massachusetts, Vermont, New Hampshire, Vermont, and Connecticut.