Powered by Deep Web Technologies
Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Water-Power Development, Conservation of Hydroelectric Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia)...

2

Hydroelectric power resources form regional clusters - Today ...  

U.S. Energy Information Administration (EIA)

Hydroelectric power generation resources are spread unevenly across North America. Some regions, like the Pacific Northwest, generate a significant amount of their ...

3

Energy 101: Hydroelectric Power | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy 101: Hydroelectric Power Energy 101: Hydroelectric Power Energy 101: Hydroelectric Power August 13, 2013 - 2:27pm Addthis Learn how hydroelectric power, or hydropower, captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. Humans have been using water to generate power for thousands of years. Hydroelectric power, or hydropower, captures the kinetic energy of flowing water and turns it into electricity, which is then fed into the electrical grid to be used in homes and businesses. This edition of Energy 101 shows how the Energy Department is supporting the development of new hydropower technologies to produce clean, renewable, and reliable power here in the United States. For more information on hydropower from the Office of Energy Efficiency and

4

Miniature Hydroelectric Power Plant : EnergySmart School Inventors  

NLE Websites -- All DOE Office Websites (Extended Search)

Miniature Hydroelectric Power Plant EnergySmart School Inventors EnergySmart School Inventors Miniature Hydroelectric Power Plant Michael Torrey Inventor: Michael Torrey The...

5

Arrangement for hydroelectric power plants  

SciTech Connect

Hydroelectric power plant contains a flow tube for the water, an inlet tube leading to the flow tube and a discharge tube leading from the flow tube. In the flow tube a turbine is arranged to be driven by the flowing water and which via a drive shaft drives an electric generator. Accentuated sub-divisioning as between mechanical unit and portions of an installation nature is provided. The turbine and generator are located in the direct vicinity of each other and together with the drive shaft form a unit which in its entirety is situate in the flow tube and arranged to be traversed by flowing water. The unit is so arranged that the turbine can be in contact with the water flow while the generator has a watertight enclosure into which the drive shaft extends through a watertight bushing. Furthermore an electric cable for transmitting the electricity produced is connected. The installation components, the said tubes, are made from prefabricated concrete components. The flow tube is essentially vertical and exhibits a support for the unit and, at its upper end, an aperture through which the unit can be lowered.

Osterberg, T.V.

1984-03-13T23:59:59.000Z

6

Definition: Hydroelectric power | Open Energy Information  

Open Energy Info (EERE)

power power Jump to: navigation, search Dictionary.png Hydroelectric power The use of flowing water to power a turbine to produce electrical energy.[1] View on Wikipedia Wikipedia Definition Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. It is the most widely used form of renewable energy, accounting for 16 percent of global electricity generation - 3,427 terawatt-hours of electricity production in 2010, and is expected to increase about 3.1% each year for the next 25 years. Hydropower is produced in 150 countries, with the Asia-Pacific region generating 32 percent of global hydropower in 2010. China is the largest hydroelectricity producer, with 721 terawatt-hours of production in 2010,

7

Environmental requirements at hydroelectric power plants  

DOE Green Energy (OSTI)

Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour.

Cada, G.F. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.; Francfort, J.E. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

1993-12-31T23:59:59.000Z

8

Small-Scale Hydroelectric Power Demonstration Project  

DOE Green Energy (OSTI)

The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

Gleeson, L.

1991-12-01T23:59:59.000Z

9

Asia Power Leibo Hydroelectricity Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Sichuan Province, China Sector Hydro Product China-based developer and operator of small hydro plants. References Asia Power (Leibo) Hydroelectricity Co Ltd1 LinkedIn...

10

Interactive Trouble Condition Sign Discovery for Hydroelectric Power Plants  

Science Conference Proceedings (OSTI)

Kyushu Electric Power Co.,Inc. collects different sensor data and weather information (hereafter, operation data) to maintain the safety of hydroelectric power plants while the plants are running. It is very rare to occur trouble condition in the plants. ... Keywords: Data Mining, Hydroelectric Power Plant, Support Vector Machine, Trouble Condition Detection

Takashi Onoda; Norihiko Ito; Hironobu Yamasaki

2009-07-01T23:59:59.000Z

11

Hydroelectric power potential, Woonsocket Falls Dam, Woonsocket, Rhode Island  

DOE Green Energy (OSTI)

The feasibility of developing a hydroelectric power plant at an existing flood control dam of the city of Woonsocket, RI was examined considering environmental, economic, technical and engineering factors. It was concluded that the City should proceed with plans to develop a hydro plant. (LCL)

Daly, J C; Dowdell, R B; Kelly, W E; Koveos, P E; Krikorian, Jr, J S; Lengyel, G; Prince, M J; Seely, S; Tromp, L; Urish, D W

1979-01-01T23:59:59.000Z

12

TY JOUR T1 Life Cycle Assessment of Electric Power Systems JF Annual Review of Environment and Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Cycle Assessment of Electric Power Systems Life Cycle Assessment of Electric Power Systems JF Annual Review of Environment and Resources A1 Eric R Masanet A1 Yuan Chang A1 Anand R Gopal A1 Peter H Larsen A1 William R Morrow A1 Roger Sathre A1 Arman Shehabi A1 Pei Zhai KW electricity KW energy policy KW environmental analysis KW life cycle impact KW life cycle inventory AB p The application of life cycle assessment LCA to electric power EP technologies is a vibrant research pursuit that is likely to continue as the world seeks ways to meet growing electricity demand with reduced environmental and human health impacts While LCA is an evolving methodology with a number of barriers and challenges to its effective use LCA studies to date have clearly improved our understanding of the life cycle energy

13

Microsoft PowerPoint - AECC Hydroelectric Generation 2010.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Electric Cooperative Corporation Cooperative Corporation AECC H d l i AECC Hydroelectric Generation Facilities Generation Facilities Arkansas Electric Cooperative Corporation Cooperative Corporation * Generation and Transmission Cooperative headquartered in Little Rock * Wholesale power provider for 16 distribution cooperatives * Serves about 62% of Arkansas with over 400,000 consumers O b 2 600 MW f i 12 * Owns about 2,600 MW of generation at 12 different facilities. Arkansas Electric Cooperative Corporation Cooperative Corporation 2009 G i b S f A CC 2009 Generation by Energy Source for AECC Owned and Co-Owned Plants * Natural Gas and Oil 4.0% * Wyoming Coal 88.8% * Water 7.2% Water 7.2% Arkansas Electric Cooperative Corporation Cooperative Corporation E i ti H d l t i Existing Hydroelectric Generating Resources

14

Potential hydroelectric power Mora Canal Drop. Final report  

DOE Green Energy (OSTI)

The feasibility of installing a hydroelectric power plant on the Mora Canal Drop site in Idaho was studied. It was recommended that a 1900 kW unit be installed to generate 8,113,000 kWh per year. The project should cost approximately $1.8 million. The generating cost would be between 20.3 and 22.2 mills/kWh. A local utility has offered to buy all power produced at 26 mills/kWh. No adverse environment, safety, or socio-economic effects are foreseen. (LCL)

Willer, D.C.

1978-12-01T23:59:59.000Z

15

Water-Power Development, Conservation of Hydroelectric Power Dams and Works  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water-Power Development, Conservation of Hydroelectric Power Dams Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Systems Integrator Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Siting and Permitting Provider Virginia State Corporation Commission It is the policy of the Commonwealth of Virginia to encourage the utilization of its water resources to the greatest practicable extent, to control the waters of the Commonwealth, and also to construct or reconstruct dams in any rivers or streams within the Commonwealth for the

16

Microsoft PowerPoint - AECC Hydroelectric Generation 2010.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Cooperative Corporation Cooperative Corporation AECC H d l i AECC Hydroelectric Generation Facilities Generation Facilities Arkansas Electric Cooperative Corporation...

17

Feasibility study for Boardman River hydroelectric power. Final report  

DOE Green Energy (OSTI)

The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

None

1979-02-22T23:59:59.000Z

18

Woodruff Narrows low head hydroelectric power plant feasibility determination  

DOE Green Energy (OSTI)

Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

Not Available

1979-03-01T23:59:59.000Z

19

Automation of a hydroelectric power station using variable-structure control systems  

Science Conference Proceedings (OSTI)

This article presents the basis and conception of, and some experimental results obtained from, the automation of a hydroelectric power station. The principle of this automation, the purpose of which was to maximize the active power supplied by the station, ...

J. Erschler; F. Roubellat; J. P. Vernhes

1974-01-01T23:59:59.000Z

20

Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report  

DOE Green Energy (OSTI)

The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

Gleeson, L.

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

22

Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey  

DOE Green Energy (OSTI)

This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

1981-04-01T23:59:59.000Z

23

"1. Brownlee","Hydroelectric","Idaho Power Co",744 "2. Dworshak","Hydroelectric","USCE-North Pacific Division",400  

U.S. Energy Information Administration (EIA) Indexed Site

Idaho" Idaho" "1. Brownlee","Hydroelectric","Idaho Power Co",744 "2. Dworshak","Hydroelectric","USCE-North Pacific Division",400 "3. Cabinet Gorge","Hydroelectric","Avista Corp",255 "4. Rathdrum Power LLC","Gas","Rathdrum Operating Services Co., Inc.",248 "5. Evander Andrews Power Complex","Gas","Idaho Power Co",247 "6. Palisades","Hydroelectric","U S Bureau of Reclamation",176 "7. Bennett Mountain","Gas","Idaho Power Co",164 "8. Rathdrum","Gas","Avista Corp",132 "9. Goshen Phase II","Other Renewables","AE Power Services LLC",125

24

THE DEVELOPMENT OF HYDROELECTRIC POWER In the early 1880s the first central power-generating station  

E-Print Network (OSTI)

fostered the growth of power companies interested in potential profits. Earlier advances in dam materialsTHE DEVELOPMENT OF HYDROELECTRIC POWER In the early 1880s the first central power-generating station opened in New York City, and a plant in Appleton, Wisconsin, first utilized falling water

US Army Corps of Engineers

25

Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS  

NLE Websites -- All DOE Office Websites (Extended Search)

High Wind Power High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Technical Report NREL/TP-5500-52251 July 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Prepared under Task No. WE110810 Technical Report NREL/TP-5500-52251 July 2011 NOTICE

26

Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source  

DOE Green Energy (OSTI)

Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

Not Available

1980-07-01T23:59:59.000Z

27

HYDROELECTRIC SYSTEM DESIGN.  

E-Print Network (OSTI)

??Hydroelectric power generation is not a viable option as a prime source of electrical energy for the Pico Blanco Boy Scout Camp, as determined by… (more)

Brown, Timothy McDonnell

2010-01-01T23:59:59.000Z

28

Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint  

DOE Green Energy (OSTI)

This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-10-01T23:59:59.000Z

29

Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS  

DOE Green Energy (OSTI)

This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

Hodge, B.-M.; Lew, D.; Milligan, M.

2011-07-01T23:59:59.000Z

30

Efforts to Reduce the Impacts of Hydroelectric Power Production on Reservoir Fisheries in the United States.  

DOE Green Energy (OSTI)

Research into the environmental effects of hydroelectric power production in the United States has focused increasingly on resident and migratory fish populations. Hydropower dams and reservoirs can block fish movements in both upstream and downstream directions. These movements are essential for important stocks of anadromous and catadromous fish. In addition, some strictly freshwater fish may move long distances within a river during their life cycle.A dam can pose an impassable barrier for fish trying to move upstream unless mitigation measures in the form of ladders or lifts are provided. Fish moving downstream to the sea may become disoriented when they encounter static water within a reservoir. Both resident and migratory fish may be injured or killed by passing through the turbine or over the spillway. In the United States, a variety of organizations conduct applied research and development of measures to (1) enhance fish passage, (2) reduce the numbers of fish that are drawn into the turbine intakes, and (3) reduce the injury and mortality rates of fish that pass through the turbines. Examples of these efforts from a variety of river systems and hydroelectric power plants are described.

Cada, G. F.

1997-09-08T23:59:59.000Z

31

Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.  

DOE Green Energy (OSTI)

The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section provides the preliminary design of an experimental apparatus that will be used to expose fish to representative levels of turbulence in the laboratory.

Cada, Glenn F.; Odeh, Mufeed

2001-01-01T23:59:59.000Z

32

Pricing Hydroelectric Power Plants with/without Operational Restrictions: a Stochastic Control Approach  

E-Print Network (OSTI)

, uranium, hydroelectric, and geothermal. It also comes indirectly from wind, tidal and geo-solar sources/clean: hydroelectric, wind, tidal/wave, geothermal, and hydrogen Conventional fuels: coal, oil, oil-sand natural gas Research on Minerals, Metals and Materials (CERM3) Department of Mining and Mineral Process Engineering

Forsyth, Peter A.

33

CLIMATE CHANGE IMPACTS ON HYDROELECTRIC POWER G.P. Harrison(1),  

E-Print Network (OSTI)

Report of the Independent Scientific Advisory Board Regarding a Research Proposal for Inclusion Estimates of the effects of the hydroelectric system on the health of salmon populations are essential the hydroelectric system. Yet while it has been technically feasible to gather highly detailed information to guide

Harrison, Gareth

34

"1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353  

U.S. Energy Information Administration (EIA) Indexed Site

York" York" "1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353 "2. Ravenswood","Gas","TC Ravenswood LLC",2330 "3. Nine Mile Point Nuclear Station","Nuclear","Nine Mile Point Nuclear Sta LLC",1773 "4. Oswego Harbor Power","Petroleum","NRG Oswego Harbor Power Operations Inc",1648 "5. Northport","Gas","National Grid Generation LLC",1569 "6. Astoria Generating Station","Gas","U S Power Generating Company LLC",1315 "7. Roseton Generating Station","Gas","Dynegy Northeast Gen Inc",1212 "8. Blenheim Gilboa","Pumped Storage","New York Power Authority",1160

35

JF.!+  

Office of Legacy Management (LM)

was licensed to handle nuclear materials. 1. .If you have any'questtons, 'please feel free to call me at301-427.-1721, or Dr. W:Alexander William,s, 301-427-1719) of my staff....

36

''Rancho Hydro'': a low-head, high volume residential hydroelectric power system, Anahola, Kauai, Hawaii  

DOE Green Energy (OSTI)

The site is a 1.75 acre residential site with two households. The Anahola stream intersects the property line. Design of the proposed hydroelectric system is described, along with the permit process. Construction is in progress. (DLC)

Harder, J.D.

1982-07-01T23:59:59.000Z

37

Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report  

DOE Green Energy (OSTI)

A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

Willer, D.C.

1979-04-23T23:59:59.000Z

38

Fish passage mitigation of impacts from hydroelectric power projects in the United States  

DOE Green Energy (OSTI)

Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

Cada, G.F. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

1996-10-01T23:59:59.000Z

39

What is the role of hydroelectric power in the United States?  

Reports and Publications (EIA)

The importance of hydropower as a source of electricity generation varies by geographic region. While hydropower accounted for 6% of total U.S. electricity generation in 2010, it provided over half of the electricity in the Pacific Northwest. Because hydroelectric generation relies on precipitation, it varies widely from month to month and year to year.

2011-11-26T23:59:59.000Z

40

Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report  

DOE Green Energy (OSTI)

The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL)

None

1979-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan  

SciTech Connect

An analytic description of one decision-making process concerning whether or not to develop the hydroelectric potential of the Boardman River is presented. The focus of the analysis is on the factor that the developers considered, or should consider in making a responsible commitment to small-scale hydroelectric development. Development of the Boardman River would occur at the five dam sites. Two existing dams, owned by the county, previously generated hydroelectricity, as did a third before being washed out. One dam has never been utilized. It is owned by the city which also owns the washed-out area. The study concludes that hydroelectric power is feasible at each. Grand Traverse County and Traverse City would engage in a joint venture in developing the resource. Chapter I presents a detailed description of the developers, the river resource, and the contemplated development. Chapter II is an analysis of the factors affecting the decision making process. Chapter III summarizes the impact of the more significant barriers and incentives and presents recommendations that, if implemented, will favorably affect decisions to develop small-scale hydroelectric generation capability.

1980-05-01T23:59:59.000Z

42

Electric Power Annual - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Hydroelectric Conventional capacity includes conventional hydroelectric power excluding pumped storage facilities.

43

Analysis of the tradeoff between irrigated agriculure and hydroelectric power in the Pacific Northwest. [Base-line estimate of the effects of agricultural irrigation on the hydroelectric power generating potential projected for the year 2020  

DOE Green Energy (OSTI)

Hydrogeneration and irrigated agriculture are major competing users of the waters of the Columbia River and its tributaries. Irrigated agriculture requires the diversion of large amounts of water from the rivers, only part of which returns. As a result, streamflow is reduced and the generation potential of dams located downstream from points of irrigation diversion is reduced. In addition, irrigated agriculture involves the direct consumption of electricity to pump irrigation water and to apply it to crops in the field. The purpose of this report is to make a baseline estimate of the impact on the electrical generation system in the region of the level of irrigation development projected for year 2020 by the states of Oregon, Washington, and Idaho. This baseline estimate reflects the assumption that current conditions will prevail in the future. The results, therefore, provide a standard against which the impacts of changes in current conditions can be measured. It is estimated that the projected development level of 11.4 million acres of irrigated agriculture in Oregon, Washington, and Idaho by year 2020 would result in foregone hydroelectric generation potential of approximately 17.8 million megawatt-hours (MWh) annually and direct consumption of electric power for pumping and application of approximately 10.3 million MWh's annually. Thus, a total of 28.1 million MWh's of electric power generation will have to be traded off each year if irrigated agriculture is to be conducted on the projected scale. (ERB)

Davis, A. E.

1979-01-01T23:59:59.000Z

44

Assessment and design of small-scale hydro-electric power plants.  

E-Print Network (OSTI)

??Appraisal and design of small-scale hydro power plants requires a knowledge of hydraulics, hydrology, civil, mechanical, and electrical engineering, and basic economics. Further, small hydro… (more)

Jones, ID

1988-01-01T23:59:59.000Z

45

Feasibility determination of low-head hydroelectric power development at existing sites. Final report  

DOE Green Energy (OSTI)

This report contains the feasibility study, economic analysis, and information relevant to reactivation of the dam in Bethelehem, NH. It outlines a plan of development which calls for sale of the power to a local utility for the first few years of the project and then predominately on-site use of the power in an innovative plan for controlled-environment agriculture. The economic analyses indicate that reactivation of the dam would be a successful venture based on the present market value of 4.5 cents/kWh. The success of the second phase in the dam's use rests on the increasing financial attractiveness of locally grown produce in a state that currently imports over 90% of its food and is experiencing the spiraling costs of food, energy, and inflation. The best-suited turbine package for the site is an Ossberger 750-kW unit which would provide 4,014,000 kWh per year with a plant factor of 61%. The total capital costs of the project are $827,935.

Polonsky, R.

1979-01-01T23:59:59.000Z

46

Report on siphon penstocks for hydroelectric projects  

DOE Green Energy (OSTI)

This report on the use of siphon penstocks for hydroelectric installations has been prepared under DOE Contract AC07-82ID12356 by Acres International Corporation and draws extensively on the information and data assembled by the following organizations: CHI Engineering Services; Clearwater Hydro; Gannett Fleming Water Resources Engineers, Inc.; Harza Engineering Company; J. Kenneth Fraser and Associates, P.C.; Mead and Hunt, Inc.; TKO Power--Ott Water Engineers, Inc.; and Williams and Broome, Inc. The purpose of the study was to review the design, construction, operation, and maintenance considerations for siphon penstocks. The discussions, data, and information presented are based on experiences with the following operational siphon penstock plants: Columbia Mills Hydroelectric Plant, Virginia; Jim Falls Minimum Flow Unit Hydro Development, Wisconsin; Lac Courte Oreilles Hydro Development, Wisconsin; Ontelaunee Hydroelectric Project, Pennsylvania; Pine Grove Dam Hydroelectric Station, Pennsylvania; Pocono Lake Hydroelectric Project, Pennsylvania; Schaads Reservoir Hydroelectric Project, California; Second Broad River Hydroelectric Project, North Carolina; Superior Dam Power Station, Michigan; Tierckenkill Falls Hydroelectric Project, New York; and Traicao Hydroelectric Project, Brazil. 71 figs., 12 tabs.

Not Available

1989-02-01T23:59:59.000Z

47

Diploma Thesis Optimal Operation of a Hydroelectric Power System Subject to Stochastic Inflows and Load  

E-Print Network (OSTI)

Optimal scheduling of hydro-thermal power plants is crucial for economical electricity production. In this diploma thesis, a stochastic programming approach is used to find optimal scheduling policies in terms of minimal production cost. Stochasticity from water inflows and energy load is included in the model. The problems are approximated by the Sample Average Approximation (SAA) method and solved using a nested decomposition procedure. The precision of the solution is assessed in terms of confidence bounds computed with help of the SAA samples. Acknowledgments I would like to thank my supervisor Kristian Nolde and Andreas Poncet from ABB Corporate Research for the challenging discussion about the modelling problem. I owe many thanks to Jonas Nart, who gave mindful criticism and pointed out many inconsistencies during the writing of this thesis. Of course, any deficiencies are completely

Markus Uhr; Supervisor Kristian Nolde; Prof Dr; M. Morari

2006-01-01T23:59:59.000Z

48

Small Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Jump to: navigation, search TODO: Add description List of Small Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleSmallHydroelectric&ol...

49

DOE Office of Indian Energy Foundational Course: Hydroelectric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

produce enough electricity for a home, farm, ranch, or village. Source: http:www1.eere.energy.govwaterhydroplanttypes.html Types of Hydroelectric Power 9 * Waterwheels, used...

50

Repurposing a Hydroelectric Plant.  

E-Print Network (OSTI)

??This thesis project explores repurposing a hydroelectric plant along Richmond Virginia's Canal Walk. The building has been redesigned to create a community-oriented space programmed as… (more)

Pritcher, Melissa

2008-01-01T23:59:59.000Z

51

Hydroelectric energy | Open Energy Information  

Open Energy Info (EERE)

Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon Hydroelectric energy (Redirected from Hydroelectric)...

52

Small Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Small Hydroelectric (Redirected from Hydroelectric (Small)) Jump to: navigation, search TODO: Add description List of Small...

53

ORIGINAL ARTICLE Ecosystem services and hydroelectricity in Central America  

E-Print Network (OSTI)

addresses only those measures that affect the operation of the Northwest's hydroelectric power system of the hydroelectric power system. Some energy is lost when it is spilled and some energy is shifted out of winter to maintain current river operations. However, as more information is gathered and more research is conducted

Paris-Sud XI, Université de

54

Hydroelectric Plants (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

A permit is required from the Executive Council of Iowa for the construction, maintenance, or operation of any hydroelectric facility. All applications will be subject to a public hearing.

55

Underground pumped hydroelectric storage  

DOE Green Energy (OSTI)

Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

1984-07-01T23:59:59.000Z

56

Tribal Renewable Energy Foundational Course: Hydroelectric |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Tribal Renewable Energy Foundational Course: Hydroelectric Watch the U.S. Department of Energy Office of Indian Energy foundational course webinar on hydroelectric...

57

Hydroelectric | OpenEI  

Open Energy Info (EERE)

Hydroelectric Hydroelectric Dataset Summary Description This dataset presents summary information related to world hydropower. It is part of a supporting dataset for the book World On the Edge: How to Prevent Environmental and Economic Collapse by Lester R. Source Earth Policy Institute Date Released January 12th, 2011 (3 years ago) Date Updated Unknown Keywords Hydro Hydroelectric Data application/vnd.ms-excel icon book_wote_energy_hydro.xls (xls, 83.5 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Attribution License Comment "Reuse of our data is permitted. We merely ask that wherever it is listed, it be appropriately cited" Rate this dataset Usefulness of the metadata

58

Canton hydroelectric project: feasibility study. Final report, appendices  

DOE Green Energy (OSTI)

These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

Not Available

1979-05-01T23:59:59.000Z

59

Microsoft PowerPoint - SWT.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

a Administration to calculate the impact of such a reallocation on the rates for hydroelectric power. reallocation on the rates for hydroelectric power. US Army Corps US Army...

60

"1. John Day","Hydroelectric","USCE-North Pacific Division",2160  

U.S. Energy Information Administration (EIA) Indexed Site

Oregon" Oregon" "1. John Day","Hydroelectric","USCE-North Pacific Division",2160 "2. The Dalles","Hydroelectric","USCE-North Pacific Division",1823 "3. Bonneville","Hydroelectric","USCE-North Pacific Division",1093 "4. McNary","Hydroelectric","USCE-North Pacific Division",991 "5. Hermiston Power Partnership","Gas","Hermiston Power Partnership",615 "6. Boardman","Coal","Portland General Electric Co",585 "7. Beaver","Gas","Portland General Electric Co",487 "8. Klamath Cogeneration Plant","Gas","Pacific Klamath Energy Inc",470

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Attitudes to Hydroelectricity in Chile: The Roles of Trust and Social Identities .  

E-Print Network (OSTI)

??New large hydroelectricity (hydro) power plants have been characterised as an essential component for Chile’s economic development. Rivers are the only locally available natural resource… (more)

Elgueta, Herman

2013-01-01T23:59:59.000Z

62

Evaluating Wind-Following and Ecosystem Services for Hydroelectric Dams in PJM  

Science Conference Proceedings (OSTI)

Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. We model the decision of a hydroelectric generator to shift power capacity away from the day-ahead energy market into a "wind-following" service ... Keywords: Hydroelectric power, wind, PJM, drought, energy policy

Alisha Fernandez; Seth Blumsack; Patrick Reed

2012-01-01T23:59:59.000Z

63

The northeast Georgia hydroelectric plants.  

E-Print Network (OSTI)

??The Northeast Georgia hydroelectric plants are important cultural resources to the state of Georgia and the communities immediately adjacent. If the early technology of these… (more)

Kelly, Nancy Elizabeth

2005-01-01T23:59:59.000Z

64

Hydroelectric energy | Open Energy Information  

Open Energy Info (EERE)

Add description List of Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleHydroelectricenergy&oldid277908" Category: Articles with outstanding...

65

Marine Hydroelectric Company | Open Energy Information  

Open Energy Info (EERE)

Marine Hydroelectric Company Jump to: navigation, search Name Marine Hydroelectric Company Address 24040 Camino Del Avion A 107 Place Monarch Beach Sector Marine and Hydrokinetic...

66

Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States  

DOE Green Energy (OSTI)

A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. The legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved are emphasized.

Not Available

1980-05-01T23:59:59.000Z

67

The Bowersock Mills and Power Company 1874  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydroelectric Energy The Bowersock Mills and Power Co., Lawrence, KS Hydroelectric Energy Potential for U.S. BMPC Plant At Forefront of Development Curve "In our estimates...

68

California's electric power market faces challenges heading ...  

U.S. Energy Information Administration (EIA)

As well as importing significant hydroelectric power from the Pacific Northwest, California has a significant supply of in-state hydroelectric capacity.

69

Power Politics: The Political Economy of Russia's Electricity Sector Liberalization  

E-Print Network (OSTI)

Sayano-Shushenskaia Hydroelectric Power Plant is Siberia’scounts some of the largest hydroelectric power plants in theofficial at Bratsk hydroelectric dam, one of the world’s

Wenle, Susanne Alice

2010-01-01T23:59:59.000Z

70

Potential for hydroelectric development in Alaska  

Science Conference Proceedings (OSTI)

Testimony concerning Alaskan hydroelectricity development is presented. Various public and private organizations were represented.

Not Available

1981-01-01T23:59:59.000Z

71

Table 8.11b Electric Net Summer Capacity: Electric Power ...  

U.S. Energy Information Administration (EIA)

Power: Hydro-electric Pumped Storage: Renewable Energy: Other 9: Total: Coal 1: Petroleum 2: Natural Gas 3: Other Gases 4: Total: Conventional Hydroelectric Power 5 ...

72

Table 8.2c Electricity Net Generation: Electric Power Sector ...  

U.S. Energy Information Administration (EIA)

Power: Hydro-electric Pumped Storage 5: Renewable Energy: Other 10: Total: Coal 1: Petroleum 2: Natural Gas 3: Other Gases 4: Total: Conventional Hydroelectric Power ...

73

Table 8.2b Electricity Net Generation: Electric Power Sector ...  

U.S. Energy Information Administration (EIA)

Power: Hydro-electric Pumped Storage 5: Renewable Energy: Other 10: Total: Coal 1: Petroleum 2: Natural Gas 3: Other Gases 4: Total: Conventional Hydroelectric Power ...

74

Power Technologies Energy Data Book: Fourth Edition, Chapter...  

NLE Websites -- All DOE Office Websites (Extended Search)

the tables (such as conventional hydroelectric power, coal, and natural gas). The data book has kept historical record of pumped storage hydroelectric pumped storage plants,...

75

"1. Oahe","Hydroelectric","USCE-Missouri River District",714  

U.S. Energy Information Administration (EIA) Indexed Site

Dakota" Dakota" "1. Oahe","Hydroelectric","USCE-Missouri River District",714 "2. Big Bend","Hydroelectric","USCE-Missouri River District",520 "3. Big Stone","Coal","Otter Tail Power Co",476 "4. Fort Randall","Hydroelectric","USCE-Missouri River District",360 "5. Angus Anson","Gas","Northern States Power Co - Minnesota",338 "6. Buffalo Ridge II LLC","Other Renewables","Iberdrola Renewables Inc",210 "7. Groton Generating Station","Gas","Basin Electric Power Coop",169 "8. MinnDakota Wind LLC","Other Renewables","Iberdrola Renewables Inc",150

76

Hydroelectric Conventional | OpenEI  

Open Energy Info (EERE)

Hydroelectric Conventional Hydroelectric Conventional Dataset Summary Description Provides annual consumption (in quadrillion Btu) of renewable energy by energy use sector (residential, commercial, industrial, transportation and electricity) and by energy source (e.g. solar, biofuel) for 2004 through 2008. Original sources for data are cited on spreadsheet. Also available from: www.eia.gov/cneaf/solar.renewables/page/trends/table1_2.xls Source EIA Date Released August 01st, 2010 (4 years ago) Date Updated Unknown Keywords annual energy consumption biodiesel Biofuels biomass energy use by sector ethanol geothermal Hydroelectric Conventional Landfill Gas MSW Biogenic Other Biomass renewable energy Solar Thermal/PV Waste wind Wood and Derived Fuels Data application/vnd.ms-excel icon RE Consumption by Energy Use Sector, Excel file (xls, 32.8 KiB)

77

Normanskill Hydroelectric Facility Feasibility Assessment  

DOE Green Energy (OSTI)

A study was conducted to determine the feasibility of installing a hydroelectric generating facility at an existing dam of the Normanskill Reservoir in NY. Evaluation of the hydrologic, technical, economic, legal, instrumental and environmental factors led to the conclusion that the project is feasible and advantageous. The proposed project has a present worth net cost of $3,099,800. The benefit cost ratio is 2.36. It is estimated that the proposed hydroelectric generating facility at the French's Mills site, City of Watervliet Reservoir will replace approximately 6,000 barrels of foreign oil per year. (LCL)

Besha, J.A.

1979-01-01T23:59:59.000Z

78

The frequency that wouldn't die hydroelectric generators  

Science Conference Proceedings (OSTI)

North America's Niagara River is the site of operating 25 hertz hydroelectric generators that date to the dawn of the electrical age. The reasons why 25 Hz was chosen for such a large block of power and why that obsolete frequency has lived on for the ...

R. D. Barnett

1990-10-01T23:59:59.000Z

79

Optimization Online - Managing Hydroelectric Reservoirs over an ...  

E-Print Network (OSTI)

Jul 7, 2013 ... Managing Hydroelectric Reservoirs over an Extended Planning Horizon using a Benders Decomposition Algorithm Exploiting a Memory Loss ...

80

Advances in Hydroelectric Turbine Manufacturing and Repair  

Science Conference Proceedings (OSTI)

About this Symposium. Meeting, Materials Science & Technology 2013. Symposium, Advances in Hydroelectric Turbine Manufacturing and Repair. Sponsorship ...

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Materials Science and Technology in Hydroelectricity  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, Materials Science & Technology 2013. Symposium, Advances in Hydroelectric Turbine Manufacturing and Repair. Presentation ...

82

Hydroelectric Real Options.  

E-Print Network (OSTI)

?? Structural estimation is an important technique in analyzing economic data. Unfortunately, it is often computationally expensive to implement the most powerful and efficient statistical… (more)

Foss, Marius Øverland

2011-01-01T23:59:59.000Z

83

Optimizing profits from hydroelectricity production  

Science Conference Proceedings (OSTI)

This paper presents a deterministic and a stochastic mathematical model for maximizing the profits obtained by selling electricity produced through a cascade of dams and reservoirs in a deregulated market. The first model is based on deterministic electricity ... Keywords: Hydroelectricity, Market, Mathematical programming, Production, Stochastic programming

Daniel De Ladurantaye; Michel Gendreau; Jean-Yves Potvin

2009-02-01T23:59:59.000Z

84

List of Hydroelectric Incentives | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Incentives Hydroelectric Incentives Jump to: navigation, search The following contains the list of 1298 Hydroelectric Incentives. CSV (rows 1-500) CSV (rows 501-1000) CSV (rows 1001-1298) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active 401 Certification (Vermont) Environmental Regulations Vermont Utility Industrial Biomass/Biogas Coal with CCS Geothermal Electric Hydroelectric energy Small Hydroelectric Nuclear Yes Abatement of Air Pollution: Control of Carbon Dioxide Emissions/Carbon Dioxide Budget Trading Program (Connecticut) Environmental Regulations Connecticut Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government

85

Mechanisms for Evaluating the Role of Hydroelectric Generation in Ancillary Service Markets  

Science Conference Proceedings (OSTI)

New opportunities to provide system support and ancillary services are attracting the interest of hydroelectric generators. This research focuses primarily on three classes of reserve service (regulation, spinning, and supplemental reserves) and their relation to real power production planning.

1998-12-16T23:59:59.000Z

86

Hydroelectric plant construction cost and annual production expenses. Eighteenth annual supplement, 1974. [1974 data  

SciTech Connect

Tabulated data are presented on the generating capacity, construction costs, and production expenses for each of 432 conventional or pumped storage hydroelectric power plants in the U.S. (LCL)

1976-11-01T23:59:59.000Z

87

Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

Roberts, J. O.; Mosey, G.

2013-02-01T23:59:59.000Z

88

Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants  

DOE Green Energy (OSTI)

Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

Douglas G. Hall

2006-01-01T23:59:59.000Z

89

Hydroelectric Webinar Presentation Slides and Text Version  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides and a text version of the audio from the DOE Office of Indian Energy webinar on hydroelectric renewable energy. 

90

Shawmut hydroelectric redevelopment project. Final technical and construction cost report  

DOE Green Energy (OSTI)

This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

None

1982-08-01T23:59:59.000Z

91

Power Politics: The Political Economy of Russia's Electricity Sector Liberalization  

E-Print Network (OSTI)

tariffs/ in the electric power industry; gas industry;of the region’s hydro-electric power. Unlike in Europeanshould the large hydro-electric power plants be admitted to

Wengle, Susanne Alice

2010-01-01T23:59:59.000Z

92

Electric Power Annual - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Table 3.13. Net Generation from Hydroelectric (Conventional) Power: by State, by Sector, 2011 and 2010 (Thousand Megawatthours)

93

Four-Dimensional Data Assimilation J.-F. Louis Atmospheric and Environmental Research, Inc.  

NLE Websites -- All DOE Office Websites (Extended Search)

J.-F. Louis J.-F. Louis Atmospheric and Environmental Research, Inc. Cambridge, MA 02139 The main purpose of the ARM program is to provide the necessary data to develop, test and validate the parameterization of clouds and of their interactions with the radiation field, and the computation of radiative transfer in climate models. For the most part, however, the ARM observations will be imperfect, incomplete, redundant, indirect, and unrepresentative. This is unavoidable, despite the best efforts at equipping the Cloud and Radiation Testbed (CART) site with the best instruments. To understand these limitations, we must consider the structure of a climate model and the observation constraints. The basic prognostic variables of any climate mode! are atmospheric temperature, horizontal wind components

94

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

Science Conference Proceedings (OSTI)

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

95

Brookfield Renewable Power Corp formerly Brascan Power Corp ...  

Open Energy Info (EERE)

Hydro, Wind energy Product Toronto-based owner, operator and developer of hydroelectric power facilities, co-generation and wind power assets. Coordinates 43.64856,...

96

Hydroelectric power resources form regional clusters - Today ...  

U.S. Energy Information Administration (EIA)

Comprehensive data summaries, comparisons, analysis, ... Weekly Petroleum Status Report › Weekly Natural Gas Storage ... ability to reverse their turbines, ...

97

Energy 101: Hydroelectric Power | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of dams. America has been using hydropower to generate electricity for more than 100 years now. The words "7% Electricity From Hydropower" appear onscreen, followed by shots of...

98

Jackson Bluff Hydroelectric Project. Feasibility assessment report  

DOE Green Energy (OSTI)

A feasibility assessment study was conducted to determine if it is economical to reinstall hydroelectric generating units at the existing Jackson Bluff Dam on the Ochlockonee River in Florida. The studies and investigations have included site reconnaissance, system loads, growth rate, site hydrology, conceptual project arrangements and layouts, power output, estimates of construction costs and annual costs, economic analyses, development of a design and construction schedule and a preliminary environmental review of the proposed Project. It was concluded that the Project poses no unusual technical problems and no significant adverse environmental effects are anticipated. It shows sufficient promise of technical, economic and financial feasibility, to justify the City entering into the next phase of work, the FERC License Application, as soon as possible. The site can be restored for an investment of $9.9 to $10.4 million to establish 8.8 MW of capacity and produce 24,920 MWh of electrical energy annually, and in 10 years would save over $4 million as compared with current fuel costs for operating an oil-fueled power plant. (LCL)

Not Available

1979-03-01T23:59:59.000Z

99

Fish and hydroelectricity; Engineering a better coexistence  

Science Conference Proceedings (OSTI)

This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions.

Zorpette, G.

1990-12-01T23:59:59.000Z

100

Municipal Electric Power (Minnesota)  

Energy.gov (U.S. Department of Energy (DOE))

This section describes energy procurement for local utilities operating in Minnesota and provides a means for Minnesota cities to construct and operate hydroelectric power plants. The statute gives...

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

International Energy Outlook 2001 - Hydroelectricity and Other...  

Gasoline and Diesel Fuel Update (EIA)

4 years to complete. Mexico Renewable energy sources remain only a small part of the energy mix in Mexico. Hydroelectricity and other renewables accounted for only 7 percent of...

102

Hydroelectric Resources on State Lands (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This chapter authorizes the leasing of state lands for the development of hydroelectric resources. It provides regulations for the granting and duration of leases, as well as for the inspection of...

103

Tuttle Creek Hydroelectric Project feasibility assessment report  

DOE Green Energy (OSTI)

The results are presented of a feasibility assessment study to determine if hydroelectric generation could be developed economically at the Corps of Engineers' Tuttle Creek Dam, an existing flood control structure on the Big Blue River near Manhattan, Kansas. The studies and investigations included site reconnaissance, system load characteristics, site hydrology, conceptual project arrangements and layouts, power studies, estimates of construction costs, development of capital costs, economic feasibility, development of a design and construction schedule and preliminary environmental review of the proposed Project. The dependable capacity of the Project as delivered into the existing transmission and distribution network is 12,290 kW and the average annual energy is 56,690 MWh. For the scheduled on-line date of July 1984, the Project is estimated to have a Total Investment Cost of $19,662,000 (equal to $1333/kW installed at that time frame) with an estimated annual cost for the first year of operation of $2,696,000, assuming REA financing at 9.5% interest rate. The Project is considered technically feasible and without any major environmental issues. It shows economic feasibility providing satisfactory financing terms are available. (LCL)

None

1979-03-01T23:59:59.000Z

104

82 Home Power #55 October / November 1996 Code Corner  

E-Print Network (OSTI)

-based MicroHydro generator I've ever seen." Bob-O Schultze, Hydroelectric Editor, Home Power Magazine 632

Johnson, Eric E.

105

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

E-Print Network (OSTI)

hydroelectric, and marine and hydrokinetic power, are notmarine and hydrokinetic facilities. For wind, closed-loop biomass, and geothermal power,

Bolinger, Mark

2009-01-01T23:59:59.000Z

106

Indian River Hydroelectric Project Grant  

Science Conference Proceedings (OSTI)

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

107

Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy reve  

Science Conference Proceedings (OSTI)

Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legal requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modelling with models that predict ecosystem responses to flow.

Jager, Yetta [ORNL; Smith, Brennan T [ORNL

2008-02-01T23:59:59.000Z

108

List of Small Hydroelectric Incentives | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Incentives Hydroelectric Incentives Jump to: navigation, search The following contains the list of 1253 Small Hydroelectric Incentives. CSV (rows 1-500) CSV (rows 501-1000) CSV (rows 1001-1253) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active 401 Certification (Vermont) Environmental Regulations Vermont Utility Industrial Biomass/Biogas Coal with CCS Geothermal Electric Hydroelectric energy Small Hydroelectric Nuclear Yes APS - Renewable Energy Incentive Program (Arizona) Utility Rebate Program Arizona Commercial Residential Anaerobic Digestion Biomass Daylighting Geothermal Electric Ground Source Heat Pumps Landfill Gas Other Distributed Generation Technologies Photovoltaics Small Hydroelectric Solar Pool Heating Solar Space Heat Solar Thermal Process Heat

109

STATEMENT OF CONSIDERATIONS REQUEST BY SIEMENS WESTINGHOUSE POWER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the global power plant market. All other forms of generating electrical power, such as steam turbine technology, nuclear power, hydroelectric and wind facilities, represent...

110

Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric | Open  

Open Energy Info (EERE)

Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Jump to: navigation, search Tool Summary Name: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Agency/Company /Organization: United States Agency for International Development Sector: Energy Resource Type: Training materials Website: www.energytoolbox.org/gcre/mod_4/index.shtml Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Screenshot References: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric[1] Logo: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric GCREhydro.JPG References ↑ "Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric" Retrieved from "http://en.openei.org/w/index.php?title=Grid-Connected_Renewable_Energy_Generation_Toolkit-Hydroelectric&oldid=375082

111

Design of MIDA, a Web-Based Diagnostic Application for Hydroelectric Generators  

Science Conference Proceedings (OSTI)

Up to 95% of Hydro-Québec’s electrical power is produced by hydroelectric generators. The remainder comes from conventional thermal and nuclear generators and wind turbines. Implementing a cost-effective general maintenance program for generators ... Keywords: evolutionary prototyping, software development methodology, object-oriented prototyping tool

Luc Vouligny; Claude Hudon; Duc Ngoc Nguyen

2009-08-01T23:59:59.000Z

112

Green Power Network: RFP Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

10 megawatts. Eligible generation technologies include wind, geothermal, biomass, biogas, solar and hydroelectric power. PGE anticipates that the acquired resources will be...

113

Microsoft PowerPoint - JF_RWC Motreal PHEV_2009 Sept.ppt [Compatibilit...  

NLE Websites -- All DOE Office Websites (Extended Search)

g - Provide benchmark data to technology modelers, research and development programs, vehicle manufacturers (via VSATT) and target and goal setters manufacturers (via VSATT),...

114

Hydroelectric reservoir optimization in a pool market  

Science Conference Proceedings (OSTI)

For a price-taking generator operating a hydro-electric reservoir in a pool electricity market, the optimal stack to offer in each trading period over a planning horizon can be computed using dynamic programming. However, the market trading period (usually ...

G. Pritchard; A. B. Philpott; P. J. Neame

2005-07-01T23:59:59.000Z

115

Market Offering Strategies for Hydroelectric Generators  

Science Conference Proceedings (OSTI)

This paper considers the problem of offering electricity produced by a series of hydroelectric reservoirs to a pool-type central market. The market model is a simplified version of the New Zealand wholesale electricity market, with prices modelled by ... Keywords: Dynamic programming: finite state, markov, Natural resources: energy, water resources, Probability: markov processes

G. Pritchard; G. Zakeri

2003-07-01T23:59:59.000Z

116

Benefits of fish passage and protection measures at hydroelectric projects  

DOE Green Energy (OSTI)

The US Department of Energy`s Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations.

Cada, G.F.; Jones, D.W.

1993-06-01T23:59:59.000Z

117

Effects of Markets and Operations on the Suboptimization of Pumped Storage and Conventional Hydroelectric Plants  

Science Conference Proceedings (OSTI)

Detailed plant performance analyses were conducted using unit performance data, market data, and plant operational data from 2008, 2009, and 2010 for five pumped storage plants and three conventional hydroelectric plants. These eight case studies encompass three markets (MISO, PJM, and NYISO) and two regions (Southeast area and Western area). Owners for the eight plants include three investor-owned utilities, two state power authorities, and one federal power corporation. This report expands on ...

2013-04-02T23:59:59.000Z

118

Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.  

DOE Green Energy (OSTI)

This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

Wood, Marilyn

1984-06-01T23:59:59.000Z

119

2025 Power Marketing Initiative  

NLE Websites -- All DOE Office Websites (Extended Search)

and is in the process of developing a plan for marketing and allocating LAP hydroelectric power after the FES contracts expire. We call this plan our 2025 Power Marketing...

120

Federal Power Marketing Administrations operate across much of ...  

U.S. Energy Information Administration (EIA)

WAPA markets power from the Hoover Dam, which is the nation's sixth largest hydroelectric power facility and is located on the Colorado River.

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Lessons Learned: Pangue Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Lessons Learned: Pangue Hydroelectric Lessons Learned: Pangue Hydroelectric Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Lessons Learned: Pangue Hydroelectric Agency/Company /Organization: International Finance Corporation Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Background analysis Resource Type: Lessons learned/best practices Website: www.ifc.org/ifcext/sustainability.nsf/AttachmentsByTitle/p_pangue_summ Country: Chile UN Region: Latin America and the Caribbean Coordinates: -35.675147°, -71.542969° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-35.675147,"lon":-71.542969,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

122

Wildlife and Wildlife Habitat Mitigation Plan for the Thompson Falls Hydroelectric Project, Final Report.  

DOE Green Energy (OSTI)

This document presents a preliminary mitigation and enhancement plan for the Thompson Falls hydroelectric project. It discusses options available to provide wildlife protection, mitigation and enhancement in accordance with the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501). The options focus on mitigation for wildlife and wildlife habitat losses attributable to the construction of the hydroelectric project. These losses were previously estimated from the best available information concerning the degree of negative and positive impacts to target wildlife species (Wood and Olsen 1984). Criteria by which the mitigation alternatives were evaluated were the same as those used to assess the impacts identified in the Phase I document (Wood and Olsen 1984). They were also evaluated according to feasibility and cost effectiveness. This document specifically focuses on mitigation for target species which were identified during Phase I (Wood and Olsen 1984). It was assumed mitigation and enhancement for the many other target wildlife species impacted by the hydroelectric developments will occur as secondary benefits. The recommended mitigation plan includes two recommended mitigation projects: (1) development of wildlife protection and enhancement plans for MPC lands and (2) strategies to protect several large islands upstream of the Thompson Falls reservoir. If implemented, these projects would provide satisfactory mitigation for wildlife losses associated with the Thompson Falls hydroelectric project. The intent of the mitigation plan is to recommend wildlife management objectives and guidelines. The specific techniques, plans, methods and agreements would be developed is part of the implementation phase.

Bissell, Gael; Wood, Marilyn

1985-08-01T23:59:59.000Z

123

Microsoft PowerPoint - Mission.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Administration's mission is to market and reliably deliver Federal hydroelectric power with preference to public bodies and cooperatives. This is accomplished by maximizing the use...

124

Developing an acoustic discharge measurement technique for hydroelectric performance testing.  

E-Print Network (OSTI)

??The efficient operation of hydroelectric generating plants requires an accurate definition of the performance relationships of each turbine/generator unit. Of the information obtained by performance… (more)

Gawne, Kevin D.

1997-01-01T23:59:59.000Z

125

Electromagnetic Analysis of Rotating Permanent Magnet Exciters for Hydroelectric Generators.  

E-Print Network (OSTI)

??The purpose of this project is to analyse different design possibilities for a rotating permanent magnet exciter for a hydroelectric generator. This is done through… (more)

Nöland, Jonas

2013-01-01T23:59:59.000Z

126

Today in Energy - Seasonal hydroelectric output drives down ...  

U.S. Energy Information Administration (EIA)

Increased hydroelectric output in the Pacific Northwest drove daily, on-peak prices of electricity below $10 per megawatthour in late April (see chart above) at the ...

127

Northwest hydroelectric output above five-year range for much ...  

U.S. Energy Information Administration (EIA)

The 2011 hydro season began earlier and lasted significantly longer than in recent years, well into the summer months (see chart above). Hydroelectric generation in ...

128

PP-89-1 Bangor Hydro-Electric Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-89-1 Bangor Hydro-Electric Company PP-89-1 Bangor Hydro-Electric Company Presidental permit authorizing Bangor Hydro-Electric Company to construc, operate and maintain electric...

129

PP-89-1 Bangor Hydro-Electric Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 Bangor Hydro-Electric Company PP-89-1 Bangor Hydro-Electric Company Presidental permit authorizing Bangor Hydro-Electric Company to construc, operate and maintain electric...

130

Storing hydroelectricity to meet peak-hour demand  

Science Conference Proceedings (OSTI)

This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building baseload plants. Operating them, however, is more expensive because peaking plants are less efficient that baseload plants.

Valenti, M.

1992-04-01T23:59:59.000Z

131

Guide to development of small hydroelectric and microhydroelectric projects in North Carolina  

Science Conference Proceedings (OSTI)

A guide to the development of small-scale hydroelectric projects in North Carolina is presented. The guide provides a potential developer with a simplified method of evaluating whether a project warrants additional investments of time and money. Information is presented on regulatory analysis, engineering analysis, microhydro development, environmental analysis, power marketing factors, and financing factors. Appendixes present information on where to go for further information and action.

Warren, J.L.; Gallimore, P.

1983-01-01T23:59:59.000Z

132

Maintaining and Monitoring Dissolved Oxygen at Hydroelectric Projects: Status Report  

Science Conference Proceedings (OSTI)

This report is an update of EPRI's 1990 report, "Assessment and Guide for Meeting Dissolved Oxygen Water Quality Standards for Hydroelectric Plant Discharges" (GS-7001). The report provides an updated review of technologies and techniques for enhancing dissolved oxygen (DO) levels in reservoirs and releases from hydroelectric projects and state-of-the-art methods, equipment, and techniques for monitoring DO.

2002-05-28T23:59:59.000Z

133

On construction sequence optimization of cascaded hydroelectric stations  

Science Conference Proceedings (OSTI)

In basin planning, many hydroelectric stations are to be constructed in a river in order to develop the water energy cascadedly. If there were no constraints on financial resources, material resources, and manpower, all the stations would be constructed ... Keywords: algorithm, hydroelectric station, optimization, profits

Xingming Sun; Huowang Chen; Jianping Yin; Xinhai Jin; Aiming Yang; Changyun Li

2002-01-01T23:59:59.000Z

134

DEVELOPMENT OF IMPROVED ANAEROBIC GROWTH OF BACILLUS MOJAVENSIS STRAIN JF-2 FOR THE PURPOSE OF IMPROVED ANAEROBIC BIOSURFACTANT PRODUCTION FOR ENHANCED OIL RECOVERY  

Science Conference Proceedings (OSTI)

Our work focuses on the use of microorganisms to recover petroleum hydrocarbons that remain entrapped after current recovery technologies reach their economic limit. Capillary forces between the hydrocarbon and aqueous phases are largely responsible for trapping the hydrocarbons in the pores of the rock and large reductions in the interfacial tension between the hydrocarbon and aqueous phases are needed for hydrocarbon mobilization (1-3, 10, 11). Microorganisms produce a variety of biosurfactants (4), several of which generate the ultra low interfacial tensions needed for hydrocarbon mobilization (4, 5, 8). In particular, the lipopeptide biosurfactant produced by Bacillus mojavensis strain JF-2 reduces the interfacial tension between hydrocarbon and aqueous phases to very low levels (herring sperm DNA, E. coli DNA or synthetic DNA (single or double stranded) to Medium E all supported anaerobic growth of JF-2. Further, we found that JF-2 required all four deoxyribonucleosides (deoxyadeonosine, deoxyguanosine, deoxycytidine and thymidine) for growth under strict anaerobic conditions. The requirement for the deoxyribonucleosides did not occur under aerobic growth conditions. DNA was not used as a sole energy source; sucrose was required for anaerobic growth and biosurfactant production in DNA-supplemented Medium E. In addition to DNA or deoxyribonucleosides, nitrate, amino acids and vitamins were all required for anaerobic growth of JF-2. Bacillus mojavensisT (ABO21191), Bacillus mojavensis, strain ROB2 also required DNA or deoxyribonucleosides for anaerobic growth. The improved anaerobic growth of Bacillus mojavensis JF-2 was a prerequisite for studies that will lead to improved anaerobic biosurfactant production.

M.J. McInerney; M. Folmsbee; D. Nagle

2004-05-31T23:59:59.000Z

135

Table 10.2c Renewable Energy Consumption: Electric Power Sector...  

U.S. Energy Information Administration (EIA) Indexed Site

Energy Consumption: Electric Power Sector, 1949-2011" " (Billion Btu)" "Year",,,"Geothermal 2",,"SolarPV 3",,"Wind 4",,"Biomass",,,,,,"Total" ,"Hydroelectric" ,"Power...

136

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

Science Conference Proceedings (OSTI)

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

137

UGP Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

River. Seven dams and powerplants have the installed capacity of 2,610 MW. That hydroelectric power is delivered across about 7,919 circuit-miles of Federal transmission line....

138

Vermont Marble Company, Proctor, Vermont: Otter Creek hydroelectric feasibility report  

DOE Green Energy (OSTI)

Vermont Marble Company (VMCO) owns and operates four hydroelectric projects in a 50-mile reach of Otter Creek in west central Vermont. This study concerns three of the installations - Center Rutland, Beldens, and Huntington Falls. The fourth site is known as Proctor and will be studied separately. All four plants operate as run-of-river stations, and the limited reservoir storage capacity places severe limitations on any other type of operation. The plants are presently operating at much lower outputs than can be obtained, because they do not use the available discharge and head. The results show that, under the assumptions made in this study, Beldens and Huntington Falls can be economically improved. The rehabilitation of the Center Rutland plant did not look economically attractive. However, the improvement of Center Rutland should not be eliminated from further consideration, because it could become economically attractive if the cost of energy starts escalating at a rate of around 10% per year. The study included a brief appraisal of the existing generating facilities and condition of existing concrete structures, a geological reconnaissance of the sites, analysis of the power potential, flood studies, technical and economic investigations and comparative evaluations of the alternatives for developing the streamflow for power generation, selection of the most suitable alternative, financial analysis, preparation of drawings, and preparation of detailed quantity and cost estimates.

None

1979-02-01T23:59:59.000Z

139

Power Technologies Energy Data Book: Fourth Edition, Chapter...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOEPI-0002. November 2003 (draft update, September 2005). 45 Hydroelectric Power Market Data U.S. Installed Capacity (MW)* Source: Renewable Electric Plant Information System...

140

NREL: Power Technologies Energy Data Book - Technology Cross...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Analysis Center Energy Analysis Newsletter Power Technologies Energy Data Book Home Table of Contents Browse by Technology Biomass Geothermal Hydroelectric Solar Wind...

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DEVELOPMENT OF IMPROVED ANAEROBIC GROWTH OF BACILLUS MOJAVENSIS STRAIN JF-2 FOR THE PURPOSE OF IMPROVED ANAEROBIC BIOSURFACTANT PRODUCTION FOR ENHANCED OIL RECOVERY  

SciTech Connect

Our work focuses on the use of microorganisms to recover petroleum hydrocarbons that remain entrapped after current recovery technologies reach their economic limit. Capillary forces between the hydrocarbon and aqueous phases are largely responsible for trapping the hydrocarbons in the pores of the rock and large reductions in the interfacial tension between the hydrocarbon and aqueous phases are needed for hydrocarbon mobilization (1-3, 10, 11). Microorganisms produce a variety of biosurfactants (4), several of which generate the ultra low interfacial tensions needed for hydrocarbon mobilization (4, 5, 8). In particular, the lipopeptide biosurfactant produced by Bacillus mojavensis strain JF-2 reduces the interfacial tension between hydrocarbon and aqueous phases to very low levels (<0.016 mN/m) (8) (9). B. mojavensis JF-2 grows under the environmental conditions found in many oil reservoirs, i. e., anaerobic, NaCl concentrations up to 80 g l{sup -1}, and temperatures up to 45 C (6, 7), making it ideally suited for in situ applications. However, anaerobic growth of B. mojavensis JF-2 was inconsistent and difficult to replicate, which limited its use for in situ applications. Our initial studies revealed that enzymatic digests, such as Proteose Peptone, were required for anaerobic growth of Bacillus mojavensis JF-2. Subsequent purification of the growth-enhancing factor in Proteose Peptone resulted in the identification of the growth-enhancing factor as DNA or deoxyribonucleosides. The addition of salmon sperm DNA, herring sperm DNA, E. coli DNA or synthetic DNA (single or double stranded) to Medium E all supported anaerobic growth of JF-2. Further, we found that JF-2 required all four deoxyribonucleosides (deoxyadeonosine, deoxyguanosine, deoxycytidine and thymidine) for growth under strict anaerobic conditions. The requirement for the deoxyribonucleosides did not occur under aerobic growth conditions. DNA was not used as a sole energy source; sucrose was required for anaerobic growth and biosurfactant production in DNA-supplemented Medium E. In addition to DNA or deoxyribonucleosides, nitrate, amino acids and vitamins were all required for anaerobic growth of JF-2. Bacillus mojavensisT (ABO21191), Bacillus mojavensis, strain ROB2 also required DNA or deoxyribonucleosides for anaerobic growth. The improved anaerobic growth of Bacillus mojavensis JF-2 was a prerequisite for studies that will lead to improved anaerobic biosurfactant production.

M.J. McInerney; M. Folmsbee; D. Nagle

2004-05-31T23:59:59.000Z

142

Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland  

DOE Green Energy (OSTI)

The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

Taylor, R.J.; Green, L.L.

1979-04-01T23:59:59.000Z

143

Manual for development of small scale hydroelectric projects by public entities  

DOE Green Energy (OSTI)

This manual is designed to provide guidance to towns, cities, counties and other political subdivisions which are interested in undertaking or participating in small scale hydroelectric (SSH) development within or close to their territorial boundaries. The manual is primarily directed to those political subdivisions which either own or have access to a site, are interested in exploring the prospects for development of the site and do not have longstanding experience in the electric power development. For purposes of this manual a small scale hydroelectric project is a project of 25 to 30 MWs or less and utilizes an existing dam or structure or utilizes the site characteristics of partially breached dams or structures. As the reader will observe from the discussion that follows, several incentives under federal and state law have been implemented which favor small scale hydroelectric development at existing sites. This manual is designed to assist political subdivisions in taking advantage of these incentives and devising strategies for development. The manual will provide information to political subdivisions as to what to expect in the development process and the kinds of informed questions to ask of paid advisers. The manual, however, cannot be and should not be used as a substitute for competent advice and assistance from experienced lawyers, engineers, accountants and financing experts.

Not Available

1981-03-01T23:59:59.000Z

144

Multiproject baselines for evaluation of electric power projects  

E-Print Network (OSTI)

the coal and natural gas power plants. The coal plant coulda new natural gas plant and imported hydroelectric power (natural gas power project may claim that it offsets electricity from a coal power plant

2003-01-01T23:59:59.000Z

145

DOE/EIS-0456 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON (FERC PROJECT NO. 460) FINAL ENVIRONMENTAL IMPACT STATEMENT (FERC/EIS-0095F, ADOPTED AS DOE/EIS-0456) US Department of Energy OCTOBER 2010 Lead Agency: U.S. Department of Energy (DOE) Title: Final Environmental Impact Statement (FEIS) for the Cushman Hydroelectric Project, Mason County, Washington (Adopted) Contact: For additional copies or more information on this final environmental impact statement (EIS), please

146

Blasting aids in the reconstruction of a hydroelectric plant  

SciTech Connect

The replacement of failed impeller chambers in a hydroelectric plant is described in this article. The emphasis of the article is on the use of a blast-generating unit (BGU) for crushing reinforced concrete. The BGU feeds kerosene and nitrogen tetroxide from separate tanks to form a jet of liquid explosive mixture. The BGU performed safely and efficiently, and has been recommended for use at other hydroelectric plants. 1 ref., 1 fig., 1 tab.

Benderskii, L.F.; Evlikov, A.A.; Stupel`, R.O. [and others

1995-01-01T23:59:59.000Z

147

Microsoft PowerPoint - TeamCumberland_Nov13.pptx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Design Center Hydroelectric Design Center "Leaders in Hydropower Engineering" Leaders in Hydropower Engineering Presentation for Team Cumberland Nashville, Tennessee Steven R. Miles, PE, PMP Director, HDC 13 November 2013 US Army Corps of Engineers BUILDING STRONG ® Hydroelectric Design Center HDC performs planning, engineering and design, HDC performs planning, engineering and design, maintains expertise, and develops standards for the US Army Corps of Engineers hydroelectric power facilities and large pumping plants. BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 2 USACE Hydropower Locations = HDC Locations BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 3 Major Producers of Hydropower in the U.S. Hydroelectric Generation Capacity in Megawatts (includes Pumped Storage) PacifiCorp Consumers Energy Co.

148

Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.  

DOE Green Energy (OSTI)

This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

Howerton, Jack

1984-11-01T23:59:59.000Z

149

Snettisham Hydroelectric Project, Alaska second stage development, Crater lake. Final foundation report. Final report  

Science Conference Proceedings (OSTI)

The important geologic features and methods used to construct the Crater Lake stage of the Snettisham Hydroelectric project, built between 1985 and 1989, are discussed. The project added 31 megawatts of non-polluting, renewable electric power for Juneau, Alaska and the surrounding area. Features of the report include the power tunnel and access adits, penstock excavation, surge shaft, gate shaft and lake top. Construction aspects include the general geology, design features, construction methods, geologic conditions encountered, ground support requirements, grouting, instrumentation and tunnel filling. Foundation conditions for the Crater Lake status were excellent, permitting the power and penstock tunnel and shafts to be constructed essentially unlined. The basic rock type throughout the project is a high-quality, quartz diorite gneiss with randomly spaced, subparallel basalt dikes.... Unlined rock tunnels, Power tunnel, Penstocks, Lake tap, Surge shaft.

Not Available

1992-09-04T23:59:59.000Z

150

Small-scale hydroelectric power in Watauga County, North Carolina  

DOE Green Energy (OSTI)

We have completed both the installation of the demonstration project and the assessment of the stream flows in Watauga County, North Carolina. The 17 kW, high head (178'), project on Laurel Creek in Watauga County has produced about 60,000 kWh over its first nine months of operation despite some electrical and other problems. It is currently producing 16 to 17 kW on a steady basis and is functioning as a popular site for visits by people who plan to install their own similar plants in areas throughout the Southeast. The stream assessment proved to be less satisfactory than the subsequently developed method for predicting long term stream flows. The latter method has been applied to all western North Carolina and this report presents its general conclusions.

Ayers, H G

1983-02-22T23:59:59.000Z

151

Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report  

DOE Green Energy (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

HDR Alaska, Inc.

1998-11-01T23:59:59.000Z

152

Power Politics: The Political Economy of Russia's Electricity Sector Liberalization  

E-Print Network (OSTI)

Sayano-Shushenskaia Hydroelectric Power Plant is Siberia’s only large power plant in which UES (and now Hydro-OGK’s)important regional power plants. 424 As with the conflict

Wenle, Susanne Alice

2010-01-01T23:59:59.000Z

153

Development and Implementation of an Expert System for Vibration Monitoring and Diagnoses for Hydroelectric Pumped Storage Units  

Science Conference Proceedings (OSTI)

A reliable expert diagnostic system supports a condition-based approach to maintenance that enables plant management to extend the time between outages and plan specific maintenance efforts. This report describes the two-phase development and implementation of a rule-based expert system for performing vibration monitoring and diagnostics on four hydroelectric pumped storage units of the New York Power Authority (NYPA). Developers estimate that the system could save plants $150,000/yr in forced outage cos...

1998-11-11T23:59:59.000Z

154

Bangor Hydro-Electric Co | Open Energy Information  

Open Energy Info (EERE)

Bangor Hydro-Electric Co Bangor Hydro-Electric Co Jump to: navigation, search Name Bangor Hydro-Electric Co Place Maine Service Territory Maine Website www.bhe.com/ Green Button Landing Page secure.bhe.com/webPortal/ Green Button Reference Page www.bhe.com/about-us/news Green Button Implemented Yes Utility Id 1179 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 9 (General Service Rate) Commercial Commercial space heating- Single meter Commercial

155

Table 8.11c Electric Net Summer Capacity: Electric Power Sector by ...  

U.S. Energy Information Administration (EIA)

(Breakout of Table 8.11b; Kilowatts) Year: Fossil Fuels: Nuclear Electric Power: Hydro-electric Pumped Storage: Renewable Energy: Other 8: Total: Coal 1: Petroleum 2 ...

156

DOE Office of Indian Energy Foundational Course: Hydroelectric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Hydroelectric Presented by the National Renewable Energy Laboratory Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Course Introduction  Resource Map & Project Scales  Technology Overview: - Siting - Costs  Successful Project Examples  Policies Relevant to Project Development  Additional Information & Resources Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in

157

FUTURE HYDROELECTRIC DEVELOPMENT SECTION 12 FISH AND WILDLIFE PROGRAM 12-1 September 13, 1995  

E-Print Network (OSTI)

during the Federal Energy Regulatory Commission (FERC) proceedings on renewal of the hydroelectric of decommissioning dams in the Klamath Hydroelectric Project, Energy Commission staff has completed a preliminaryPRELIMINARY ASSESSMENT OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Kevin

158

Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.  

DOE Green Energy (OSTI)

The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

Martin, Robert C.; Mehrhoff, L.A.

1985-01-01T23:59:59.000Z

159

Assessment of Aerating Hydroelectric Turbine Developments and Related Research Needs  

Science Conference Proceedings (OSTI)

Aerating hydroelectric turbine developments and research needs were assessed in four separate but complementary areas. This report expands on previous work and describes industry experience with aerating  minimum and environmental flow units; with aerating Kaplan, propeller units, and diagonal flow units; and with environmental optimization of aerating turbines. In addition, the report discusses results from data analyses of the long-term ...

2013-12-17T23:59:59.000Z

160

Manual of small-scale hydroelectric generation in South Dakota  

SciTech Connect

This document contains a preliminary inventory of small scale hydroelectric potential in South Dakota and a simplified methodology for calculating economic feasibility of a project. In addition, the various technologies presently on the market, sources of technical and financial assistance and the various permits required for development are also discussed.

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Advanced, Environmentally Friendly Hydroelectric Turbines for the Restoration of Fish and Water Quality  

DOE Green Energy (OSTI)

Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the world?s electrical energy. The contribution of hydroelectric generation has declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, ?environmentally friendly? turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been he AHTS program are described.

Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

1999-09-06T23:59:59.000Z

162

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

DOE Green Energy (OSTI)

The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

163

International Energy Outlook 2000 - Hydroelectricity and Other Renewable  

Gasoline and Diesel Fuel Update (EIA)

The renewable energy share of total world energy consumption is expected to continue at a level of about 8 percent from 1997 through 2020, despite a projected 54-percent increase in consumption of hydroelectricity and other renewable resources. The renewable energy share of total world energy consumption is expected to continue at a level of about 8 percent from 1997 through 2020, despite a projected 54-percent increase in consumption of hydroelectricity and other renewable resources. The development of renewable energy sources is constrained in the International Energy Outlook 2000 (IEO2000) reference case projections by expectations that fossil fuel prices will remain low and, as a result, renewables will have a difficult time competing. Although energy prices rebounded in 1999 from 1998 lows, it remains unlikely that renewable energy can compete economically over the projection period. Failing a strong worldwide commitment to environmental considerations, such as the limitations and reductions of carbon emissions outlined in the Kyoto

164

A Study of United States Hydroelectric Plant Ownership  

Science Conference Proceedings (OSTI)

Ownership of United States hydroelectric plants is reviewed from several perspectives. Plant owners are grouped into six owner classes as defined by the Federal Energy Regulatory Commission. The numbers of plants and the corresponding total capacity associated with each owner class are enumerated. The plant owner population is also evaluated based on the number of owners in each owner class, the number of plants owned by a single owner, and the size of plants based on capacity ranges associated with each owner class. Plant numbers and corresponding total capacity associated with owner classes in each state are evaluated. Ownership by federal agencies in terms of the number of plants owned by each agency and the corresponding total capacity is enumerated. A GIS application that is publicly available on the Internet that displays hydroelectric plants on maps and provides basic information about them is described.

Douglas G Hall

2006-06-01T23:59:59.000Z

165

Model documentation report: Short-Term Hydroelectric Generation Model  

DOE Green Energy (OSTI)

The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration`s (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook.

Not Available

1993-08-01T23:59:59.000Z

166

MHK Projects/Deception Pass Tidal Energy Hydroelectric Project | Open  

Open Energy Info (EERE)

Deception Pass Tidal Energy Hydroelectric Project Deception Pass Tidal Energy Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.4072,"lon":-122.643,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

167

Results from Case Studies of Conventional Hydroelectric Plants  

Science Conference Proceedings (OSTI)

Detailed plant performance analyses for three conventional hydroelectric plants were conducted using unit and plant performance characteristics and 1-minute plant operational data from 2008, 2009, and 2010. This report describes results from detailed performance analyses that evaluated reductions in overall plant efficiencies under a variety of operation-related and market-related conditions for the plants. Results show that the non-market operation of the conventional plant exhibited more efficient ...

2012-09-14T23:59:59.000Z

168

Legal factors affecting the financing of small scale hydroelectric projects  

DOE Green Energy (OSTI)

An introduction to the major business organizational options open to small-scale hydroelectric (SSH) projects is given. The major federal income tax treatments of these options are compared. Significant general federal income tax factors affecting SSH projects are reintroduced and explained. Some of the special federal income tax problem areas in SSH development are isolated. Tax benefit flow through or transfer mechanisms are discussed. Tax exempt financing opportunities for private SSH projects are reviewed. (MHR)

Wilson, W.H.; Ringo, M.J.; Forgione, N.

1983-09-01T23:59:59.000Z

169

Short-term hydroelectric generation model. Model documentation report  

DOE Green Energy (OSTI)

The purpose of this report is to define the objectives of the Energy Information Administration`s (EIA) Short-Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the EIA`s legal obligation to provide adequate documentation in support of its models.

NONE

1996-12-01T23:59:59.000Z

170

Hydroelectric feasibility study: Chubb River Sites, Village of Lake Placid, New York  

DOE Green Energy (OSTI)

This study was performed to determine if the re-installation and re-activation of hydroelectric generating facilities at the Mill Pond and Power Pond dams in the Village of Lake Placid, N.Y. would be technically, environmentally, and economically feasible. The study includes a description and evaluation of the conditions of the existing facilities, an estimate of the potential generation at the two sites, a review of regulatory requirements, an economic analysis, and an implementation schedule for installing the facilities. The results show that the installation of new generating equipment within the existing powerhouse may be economically advantageous. Installation of generating facilities at the Mill Pond site would be uneconomical due to low head, aesthetic, environmental costraints, and therefore, is not recommended. The benefits which would be realized by installing equipment at the powerhouse are long term and station operation would initially have to be subsidized for a number of years. (LCL)

Not Available

1979-01-01T23:59:59.000Z

171

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1995 Annual Report.  

DOE Green Energy (OSTI)

The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams.

Martinson, Rick D.; Graves, Richie J.; Langeslay, Michael J. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

1996-12-01T23:59:59.000Z

172

Feasibility determination for hydroelectric development at Thermalito Afterbay with STRAFLO turbine-generators. Final report  

DOE Green Energy (OSTI)

This study addresses the development of the Thermalito Afterbay, in California. Presently, the outlet of the afterbay dissipates the afterbay's useful energy through five radial gates into the Feather River complex. The feasibility of constructing a hydroelectric facility to recover this wasted energy through the use of STRAFLO hydro turbines is appraised, and data relevant to the future economic benefits of such a facility as compared to alternate energy alternatives are presented. In addition, the regulatory, ecological, and socio-institutional impacts which form additional considerations to a future thermalito afterbay site development are summarized. The study shows an annual generation potential of 48.82 GWh. The cost of developing the site is estimated to be $23.5 million. Social and environmental effects would be minimal. The final feasibility of development is contingent on power contracts which the state of California will be negotiating in 1983. (LCL)

Mueller, B.L.

1979-06-01T23:59:59.000Z

173

Feasibility report on the potential hydroelectric development at Combie Dam. [3. 5 MW, 70-ft head  

DOE Green Energy (OSTI)

The results of an investigation of the technical, environmental, economic and financial feasibility of installing a hydroelectric powerplant at the existing Combie Dam on the Bear River in Nevada and Placer Counties, California, are discussed. This dam is owned and operated by the Nevada Irrigation District (the District) to act as a diversion and provide some storage for District water supply. The power plant would utilize flows which presently pass over the dam's spillway. The project would involve expanding the existing four foot diameter outlet on the southern gravity portion of the dam, installing a penstock (approximately 175 feet long, 102 inches in diameter) and constructing a 3500 kilowatts (kW) power plant on the south bank of the river below the dam. The capital cost of the project, including interest during construction, would total approximately $4,500,000 in July 1980 dollars. The unit capacity cost of the project at the 1980 price level would be $1,285 per kilowatt. The energy production unit cost would be 41.4 mills per kilowatt hour in 1980, and 56.3 mills per kilowatt hour in 1984. Environmental impacts of the Combie Power Project would be minimal. The primary conclusion from this study is that the Combie Power Project is economically, environmentally and institutionally viable, at the present time if an adequate power purchase agreement can be reached. Continued escalation of energy values will make this project even more attractive. (WHK)

Not Available

1980-10-01T23:59:59.000Z

174

Maximizing Gross Margin of a Pumped Storage Hydroelectric Facility Under Uncertainty in Price and Water Inflow.  

E-Print Network (OSTI)

??The operation of a pumped storage hydroelectric facility is subject to uncertainty. This is especially true in today’s energy markets. Published models to achieve optimal… (more)

Ikudo, Akina

2009-01-01T23:59:59.000Z

175

A policy analysis of the Federal Energy Regulatory Commission's hydroelectric relicensing process.  

E-Print Network (OSTI)

??In this thesis, the FERC’s hydroelectric relicensing process is examined from a historical perspective. It finds that strong federal control to ensure a comprehensive plan… (more)

Wright, Jay

2006-01-01T23:59:59.000Z

176

"1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079  

U.S. Energy Information Administration (EIA) Indexed Site

Washington" Washington" "1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079 "2. Chief Joseph","Hydroelectric","USCE-North Pacific Division",2456 "3. Transalta Centralia Generation","Coal","TransAlta Centralia Gen LLC",1596 "4. Rocky Reach","Hydroelectric","PUD No 1 of Chelan County",1254 "5. Columbia Generating Station","Nuclear","Energy Northwest",1097 "6. Wanapum","Hydroelectric","PUD No 2 of Grant County",1059 "7. Boundary","Hydroelectric","Seattle City of",1040 "8. Priest Rapids","Hydroelectric","PUD No 2 of Grant County",932

177

Assessment of the feasibility of recommissioning the French Landing Hydroelectric Facility in Van Buren Township, Michigan. Final report  

DOE Green Energy (OSTI)

The results of a study of the feasibility of recommissioning a small, low-head hydroelectric facility in southeastern Michigan are presented. The study concludes that there are several cost-effective designs for recommissioning the site, based on the use of vertical turbines and the sale of power to nearby industrial markets. In terms of the bulk sale of power to the local electric utility, no cost-effective alternatives were found to exist. A major burden on project cost-effectiveness was found to be the relatively large costs for structural repairs to the dam and powerhouse needed to insure safe operation and on adequate service life. From an engineering standpoint it was found that the items of equipment needed to recommission the site are readily available from both US and foreign manufacturers. A variety of hydraulic turbine designs could be successfully adapted to the existing powerhouse, without extensive new construction. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and revenues. A detailed environmental assessment using an impact matrix methodology concluded that the development of the facility for hydroelectric generation would have important positive environmental consequences related to improved impoundment and flow management techniques as well as enhanced public safety due to structural repairs to the dam. The institutional and regulatory implications of developing the site for hydroelectric generation were found to be significant but manageable.

Not Available

1979-02-01T23:59:59.000Z

178

Applications of Wavelet-Packet in Fault Analysis of Hydroelectric Sets  

Science Conference Proceedings (OSTI)

This paper presents a new method using wavelet packet transform to fault diagnosis of the hydroelectric generating. The use of wavelet packet analysis unit to achieve multi-level vibration signals of wavelet packet decomposition, the analysis provides ... Keywords: wavelet packet, fault diagnosis, hydroelectric generating sets

Liu Haiying; Dai Luping

2010-06-01T23:59:59.000Z

179

GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian Aquatic Ecosystems  

E-Print Network (OSTI)

. C. CAUDILL Fish Ecology Research Laboratory, Department of Fish and Wildlife Resources, College ascension and fallback over a series of large hydroelectric dams within the migration corridor, were hydroelectric dams, a behaviour termed `fallback'. On average, 15­22% of the fishes from studied runs of chinook

Cooke, Steven J.

180

RETURN TO THE RIVER : Prepublication Copy 10 September 1996 Chapter 7 Hydroelectric Project Development264  

E-Print Network (OSTI)

, uranium, hydroelectric, and geothermal. It also comes indirectly from wind, tidal and geo-solar sources/clean: hydroelectric, wind, tidal/wave, geothermal, and hydrogen Conventional fuels: coal, oil, oil-sand natural gas Research on Minerals, Metals and Materials (CERM3) Department of Mining and Mineral Process Engineering

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.  

DOE Green Energy (OSTI)

The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

Bedrossian, Karen L.

1984-08-01T23:59:59.000Z

182

SMI 2012: Full Paper: Medial design of blades for hydroelectric turbines and ship propellers  

Science Conference Proceedings (OSTI)

We present a method for constructing blades of hydroelectric turbines and ship propellers based on design parameters that possess a clear hydraulic meaning. The design process corresponds to the classical construction of a blade using the medial surface ... Keywords: B-spline representation, CAD-model, Hydroelectric turbine blade, Medial axis-based design, Propeller blade

M. Rossgatterer; B. Jüttler; M. Kapl; G. Della Vecchia

2012-08-01T23:59:59.000Z

183

Design of a SOA-oriented E-diagnostics system for hydroelectric generating sets  

Science Conference Proceedings (OSTI)

In order to resolve existing problems such as low efficiency, high cost and lack of technical resource in current maintenance, it is necessary to realize remote diagnosis for hydroelectric generating sets (HGSs). In this work, basing on the Service-Oriented ... Keywords: E-diagnostics system, SOA, hydroelectric generating sets, web services

Liangliang Zhan; Yongchuan Zhang; Jianzhong Zhou; Yucheng Peng; Zheng Li

2007-06-01T23:59:59.000Z

184

DOE Office of Indian Energy Foundational Course on Hydroelectric Renewable Energy Text Version  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Webinar Hydroelectric Webinar (text version) Below is the text version of the Webinar titled "DOE Office of Indian Energy Foundational Courses Renewable Energy Technologies: Hydroelectric." Amy Hollander: Hello. I'm Amy Hollander with the National Renewable Energy Laboratory. Welcome to today's webinar on hydroelectricity as a renewable energy, sponsored by the U.S. Department of Energy Office of Indian Energy Policy and Programs. This webinar is being recorded from DOE's National Renewable Energy Laboratory's brand new, state of the art, net zero energy research support facility in Golden, Colorado. Our hydroelectricity presentation today is one of nine foundational webinars in the series from the DOE Office of Indian Energy Education Initiative, designed to assist tribes with

185

The making of multimedia power systems control and simulation labware  

Science Conference Proceedings (OSTI)

This paper discusses the development of a multimedia, PC-based, hydro-electric power generation system simulator to interface, via real-time data acquisition and control, to programmable logic controllers. The project is ongoing. The paper discusses ...

J. B. Patton; P. Jayanetti

1996-08-01T23:59:59.000Z

186

Plenary lecture 9: generation of electrical energy with variable speed in microhydro and eolian power plant  

Science Conference Proceedings (OSTI)

The mini hydroelectric power plant are built to use the flow of the small rivers. The main disadvantage of these systems is the reduced capacity to store a high quantity of water which should ensure the long term running of the hydroelectric plants during ...

Sorin Deaconu

2009-07-01T23:59:59.000Z

187

Feasibility study for a low-head hydroelectric installation at Archusa Creek Dam. Final report to the Pat Harrison Waterway District  

DOE Green Energy (OSTI)

The rising cost, uncertain future supply, and environmental problems associated with energy sources have resulted in serious investigation of energy sources that have not previously been considered economically and technically feasible. One such source involves low-head hydroelectric generation. The Department of Energy has funded several feasibility studies for the installation of hydroelectric generators at existing low-head dams. Such a feasibility study for the Archusa Creek Dam near Quitman, Mississippi, is described. The study indicates that there are no apparent technical dificulties to prevent such a project and that a suitable turbine-generator could be obtained. The study further indicates that the project should be economically feasible for the Pat Harrison Waterway District (owners of the dam and lake) to construct if arrangements could be completed for interconnecting with the local utility and selling the energy to the utility. The utility (Mississippi Power Company) has expressed interest in such an arrangement.

Carlson, K.W.; Herring, J.W. Jr.

1979-02-26T23:59:59.000Z

188

International Energy Outlook 1999 - Hydroelectricity and Other Renewable  

Gasoline and Diesel Fuel Update (EIA)

hydroelectricty.gif (7905 bytes) hydroelectricty.gif (7905 bytes) Renewable energy use is projected to increase by 62 percent between 1996 and 2020. Almost half the increase is expected in the developing world, where large-scale hydroelectric projects still are being undertaken. Low prices for oil and natural gas in world energy markets continued to diminish the potential for rapid development of renewable energy sources worldwide. Oil prices hit 20-year lows in 1998, in part because the Asian economic crisis resulted in lower worldwide demand. Even production cut agreements by some major oil producers, such as Saudi Arabia, Mexico, and Venezuela, failed to provide measurable price recovery during 1998. On the positive side, the Kyoto Climate Change Protocol proposals to cut greenhouse gas emissions levels may provide an opportunity for growth in

189

Inexpensive cross-flow hydropower turbine at Arbuckle Mountain Hydroelectric Project  

SciTech Connect

This report documents the first three and half years of operation and maintenance on the Arbuckle Mountain Hydroelectric Project. Located on a flashy mountain stream in northern California, the project was designed, built and tested through a Cooperative Agreement between the US DOE and OTT Engineering, Inc. (OTT). The purpose of the Agreement is to build and intensively test an inexpensive American-made cross-flow turbine and to provide information to the DOE on the cost, efficiency, operation, and maintenance of the unit. It requires that OTT document for DOE a summary of the complete operating statistics, operation and maintenance cost, and revenues from power sales for a two-year operating period. Several unique events occurred between the initial start-up (December 1986) and the beginning of the 1989 generation season (October 1988) that delayed the first year's full operation and provided unique information for a demonstration project of this type. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, and energy production, as well as the operation and maintenance costs and value of the power produced for the first three and half years of operation. 9 figs., 2 tabs.

1991-07-01T23:59:59.000Z

190

Small-Hydroelectricity and Landscape Change in the Bitterroot Mountains: Public Perceptions and Attitudes.  

E-Print Network (OSTI)

??Newman, Chad, M.A. December 2007 Geography Small-Hydroelectricity and Landscape Change in the Bitterroot Mountains: Public Perceptions and Attitudes Chairperson: Dr. David D. Shively The development… (more)

Newman, Chad E

2008-01-01T23:59:59.000Z

191

Pumped Hydroelectricity and Utility-Scale Batteries for Reserve Electricity Generation in New Zealand.  

E-Print Network (OSTI)

??Non-pumped hydroelectricity-based energy storage in New Zealand has only limited potential to expand to meet projected growth in electricity demand. Seasonal variations of hydro inflows… (more)

Kear, Gareth

2011-01-01T23:59:59.000Z

192

Hydroelectricity and landscape protection in the Highlands of Scotland, 1919 - 1980.  

E-Print Network (OSTI)

??This thesis employs twentieth-century hydroelectric development ventures in the Highlands of Scotland as a means of exploring conflicting demands of socio-economic development and landscape protection… (more)

Payne, Jill

2008-01-01T23:59:59.000Z

193

PUBLISHED ONLINE: 31 JULY 2011 | DOI: 10.1038/NGEO1211 Carbon emission from hydroelectric reservoirs  

E-Print Network (OSTI)

of hydroelectric and fuel cell facilities, respectively.) The Energy Commission recognizes the importance Edition OCTOBER 2011 CEC3002011008SD CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor #12;CALIFORNIA ENERGY COMMISSION CARLA PETERMAN Lead Commissioner Kate Zocchetti Project Manager Tony

194

Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report  

DOE Green Energy (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

NONE

1998-08-01T23:59:59.000Z

195

Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection  

DOE Green Energy (OSTI)

This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

1994-01-01T23:59:59.000Z

196

Analysis of environmental issues related to small-scale hydroelectric development IV: fish mortality resulting from turbine passage  

DOE Green Energy (OSTI)

This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner) has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.

Turbak, S. C.; Reichle, D. R.; Shriner, C. R.

1981-01-01T23:59:59.000Z

197

More power from hydro  

Science Conference Proceedings (OSTI)

Utilities are striving to upgrade the already impressive performance of hydroelectric plants at a reasonable cost. The Electric Power Research Institute (EPRI) solicited utility industry feedback on what kinds of improvements to pursue, with forced outages, scheduled outages, plant efficiency, and new equipment reliability ranking as top candidates. Innovative approaches to operation and maintenance are springing up, but more effective channels for sharing technical information are neeeded. 7 references, 2 figures, 1 table.

Lihach, N.; Birk, J.; Sullivan, C.

1984-03-01T23:59:59.000Z

198

New baseload power plants  

Science Conference Proceedings (OSTI)

This is a tabulation of the results of this magazines survey of current plans for new baseload power plants. The table lists the unit name, capacity, fuel, engineering firm, constructor, suppliers for steam generator, turbine generator and flue gas desulfurization equipment, date due on-line, and any non-utility participants. The table includes fossil-fuel plants, nuclear plants, geothermal, biomass and hydroelectric plants.

Not Available

1993-04-01T23:59:59.000Z

199

Measuring and moderating the water resource impact of biofuel production and trade  

E-Print Network (OSTI)

energy  sources,   hydroelectricity  and  concentrating  Hydroelectric  power   Hydroelectricity  is  the  dominant  As  of  2008,   hydroelectricity  accounted  for  16.3%  

Fingerman, Kevin Robert

2012-01-01T23:59:59.000Z

200

China Energy Primer  

E-Print Network (OSTI)

Hydroelectricity ..long term demand. 5. Hydroelectricity China’s hydroelectricSummary of China’s Hydroelectricity Reserves”, Sate Power

Ni, Chun Chun

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

"1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation...  

U.S. Energy Information Administration (EIA) Indexed Site

of Reclamation",7079 "2. Palo Verde","Nuclear","Arizona Public Service Co",3937 "3. Martin","Gas","Florida Power & Light Co",3695 "4. W A Parish","Coal","NRG Texas Power...

202

Water Power | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Water Power Jump to: navigation, search Water Power Basics High-level information about about water power: the clean, affordable electricity that will move our nation towards energy independence by harnessing tides, rivers, currents, wave, and marine energy. Click to learn about Hydropower: Hydroelectric-collage2.jpg When flowing water is captured and turned into electricity, it is called hydroelectric power or hydropower. Hydropower is the largest source of renewable electricity in the United States, allows the nation to avoid 200 million metric tons of carbon emissions each year, and is responsible for

203

PACIFICORP'S FINAL LICENSE APPLICATION KLAMATH RIVER HYDROELECTRIC PROJECT  

E-Print Network (OSTI)

all thermal power plant sites and related facilities in California with installed capacity of 50 megawatts (MW) or more. The Energy Commission's power plant siting program is fully certified under pertaining to large power plants and related facilities throughout the State of California. In carrying out

204

Electric power monthly, September 1990. [Glossary included  

SciTech Connect

The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

1990-12-17T23:59:59.000Z

205

Power Economic Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

CRSP Management Center CRSP Management Center Western Area Power Administration January 2011 Power Economic Analysis of Operational Restrictions at Glen Canyon Dam In February, 1997, the operating criteria for Glen Canyon Dam were changed. Operation was restricted to a Modified Low Fluctuating Flow as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement, March, 1995. These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore the economic value of the electricity it produced. The Environmental Impact Statement provided impact information to support the Record of Decision governing dam operations. The impact

206

Powering up America's Waterways | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

up America's Waterways up America's Waterways Powering up America's Waterways April 17, 2012 - 11:53am Addthis This map demonstrates the potential capacity to generate clean hydroelectric energy at existing non-powered dams across the U.S. Hoyt Battey Water Power Market Acceleration and Deployment Team Lead, Wind and Water Power Program A new report released today by the Energy Department analyzes the potential to generate clean hydroelectric energy at existing dams across the United States. Harnessing the tremendous power of the nation's waterways could help increase the supply of clean energy for American families and businesses. Thousands of dams across the country are not currently equipped to produce power. Today's report finds that if fully developed, these existing dams could provide an electrical generating capacity of more than 12 gigawatts

207

Data collection and analysis in support of risk assessment for hydroelectric stations  

DOE Green Energy (OSTI)

This project is to provide the U.S. Army Corps of Engineers with a risk analysis that evaluates the non-routine closure of water flow through the turbines of powerhouses along the Columbia and Snake Rivers. The project is divided into four phases. Phase 1 efforts collected and analyzed relevant plant failure data for hydroelectric generating stations in the United States and Canada. Results from the Phase 1 efforts will be used to assess the risk (probability times consequences) associated with non-routine shut down of hydroelectric stations, which will be performed in the remaining phases of the project. Results of this project may be used to provide policy recommendations regarding operation and maintenance of hydroelectric stations. The methodology used to complete the Phase 1 of the project is composed of data collection and analysis activities. Data collection included performing site visits, conducting a data survey of hydroelectric stations, conducting an expert panel workshop, and reviewing and tabulating failure data from generic sources. Data analysis included estimating failure rates obtained from the survey data, expert judgment elicitation process, generic data, and combining these failure rates to produce final failure rate parameters. This paper summarizes the data collection analysis, results and discussions for the Phase 1 efforts.

Vo, T.V.; Mitts, T.M.; Phan, H.K.; Blackburn, T.R.; Casazza, L.O.

1995-10-01T23:59:59.000Z

208

Small-hydroelectric-turbine generating system. Final report, June 30, 1981-December 31, 1982  

DOE Green Energy (OSTI)

The historical development of the Pelton waterwheel and the basics of impulse turbines are reviewed. A guide is given for do-it-yourself construction of small hydroelectric plants. Steps to follow in determining the requirements for a do-it-yourself plant are outlined. Final considerations are also given. (DLC)

Kennedy, B.W.

1983-03-15T23:59:59.000Z

209

Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.  

DOE Green Energy (OSTI)

This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

Howerton, Jack; Hwang, Diana

1984-11-01T23:59:59.000Z

210

HydroNode: an underwater sensor node prototype for monitoring hydroelectric reservoirs  

Science Conference Proceedings (OSTI)

The research of underwater sensor networks (UWSNs) is gaining attention due to its possible applications in many scenarios, such as ecosystem preservation, disaster prevention, oil and gas exploration and freshwater reservoirs management. The main elements ... Keywords: hydroelectric, monitoring, reservoirs, underwater sensor networks, underwater sensor node

Luiz F. M. Vieira; Marcos A. M. Vieira; David Pinto; José Augusto M. Nacif; Sadraque S. Viana; Alex B. Vieira

2012-11-01T23:59:59.000Z

211

Frequency-Bias Tie-Line Control of Hydroelectric  

E-Print Network (OSTI)

In this work I have tried to apply effective dedicated online control systems to two equal power systems connected by a long distance tie-line. When large interconnected systems are linked electrically to others by means of tie-lines, the power transfers between them are usually decided by mutual agreement and the power is controlled by regulators. Other side it is a desired feature to achieve a better frequency constancy, which has been obtained by a controller, which is being activated by frequency-bias constant. A power frequency characteristic also has been maintained approximately straight line by governor speed regulation parameter in case any perturbation in frequency is caused by load change in any one of the area.To maintain the real power flow and single frequency in tie-line power system, the governor has been manipulated by Automatic Generation Control (AGC) action. For this works various, integral (I) proportional plus integral (PI) and proportional plus integral plus derivative (PID) controllers have been tried.

Generating Stations For

2003-01-01T23:59:59.000Z

212

Electronic Performance Support System: An Application Guideline: Solving Power Plant Workforce Management Issues with Electronic Performance Support and Knowledge Management Solutions  

Science Conference Proceedings (OSTI)

This report provides guidance on how to apply electronic performance support system (EPSS) solutions to address fossil and hydroelectric power plant employee performance issues arising from the aging workforce and changing demographics of future employees.

2004-03-31T23:59:59.000Z

213

Consumptive Water Use for U.S. Power Production  

NLE Websites -- All DOE Office Websites (Extended Search)

the analyzed hydroelectric dams. 5 Table 3. United States Water Consumption per kWh of Energy Consumed by State Thermoelectric Hydroelectric 1 Thermoelectric Hydroelectric...

214

Diagnosing Unilateral Market Power in Electricity Reserves Market  

E-Print Network (OSTI)

scheduled to be served by hydroelectricity plus 7 percent ofwith Pumped storage hydroelectricity is a method of storinga turbine, generating hydroelectricity. a heat rate of

Knittel, Christopher R; Metaxoglou, Konstantinos

2008-01-01T23:59:59.000Z

215

Water quality and sedimentation implications of installing a hydroelectric dam on the Río Baker in Chilean Patagonia  

E-Print Network (OSTI)

HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

Leandro, Gianna Dee

2009-01-01T23:59:59.000Z

216

Review of Pacific Northwest Laboratory research on aquatic effects of hydroelectric generation and assessment of research needs  

DOE Green Energy (OSTI)

This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams and operating procedures and occur within a specific ecosystem, the results of these studies have application at hydroelectric generating facilities throughout the United States.

Fickeisen, D.H.; Becker, C.D.; Neitzel, D.A.

1981-05-01T23:59:59.000Z

217

Microsoft PowerPoint - SW Regional Hydropower Conference - June 2007.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

of Engineers® of Engineers® Vision Statement Vision Statement Be the premier stewards of entrusted hydropower resources US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps

218

The role of hydroelectric generation in electric power systems with large scale wind generation.  

E-Print Network (OSTI)

??An increasing awareness of the operational challenges created by intermittent generation of electricity from policy-mandated renewable resources, such as wind and solar, has led to… (more)

Hagerty, John Michael

2012-01-01T23:59:59.000Z

219

The role of hydroelectric generation in electric power systems with large scale wind generation  

E-Print Network (OSTI)

An increasing awareness of the operational challenges created by intermittent generation of electricity from policy-mandated renewable resources, such as wind and solar, has led to increased scrutiny of the public policies ...

Hagerty, John Michael

2012-01-01T23:59:59.000Z

220

Energieffektivisering av vattenkraftverk; Energy-saving measures at hydroelectric power stations.  

E-Print Network (OSTI)

?? På uppdrag från One Nordic AB utreder denna rapport ur ett allmänt perspektiv vilka energibesparande åtgärder som kan utföras på vattenkraftverk. Fokus ligger på,… (more)

Johansson, Kristina

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

MHK Projects/Lock and Dam No 2 Hydroelectric Project | Open Energy  

Open Energy Info (EERE)

Lock and Dam No 2 Hydroelectric Project Lock and Dam No 2 Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.7486,"lon":-92.8048,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

222

Report on technical feasibility of underground pumped hydroelectric storage in a marble quarry site in the Northeast United States  

DOE Green Energy (OSTI)

The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. The study concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site even with the proposed savings from marketable material amounts to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. System studies performed by the planning group of the New England Power System indicate that the system could economically justify up to about $442 per kilowatt on an energy basis with no credit for capacity. To accommodate the plant with the least expensive pumping energy, a coal and nuclear generation mix of approximately 65% would have to be available before the project becomes feasible. It is not expected that this condition can be met before the year 2000 or beyond. It is therefore concluded that the West Rutland underground pumped storage facility is uneconomic at this time. Several variables however could have marked influence on future planning and should be examined on periodic basis.

Chas. T. Main, Inc.

1982-03-01T23:59:59.000Z

223

Feasibility assessment of low-head hydroelectric development at the Peninsular Paper Company dam in Ypsilanti, Michigan. Final report  

DOE Green Energy (OSTI)

The results of a study into the feasibility of developing a small, low-head dam site for hydroelectric generation in southeastern Michigan are presented. Average hydraulic head at the site is 13.0 ft, mean stream flow is 498 cfs. Economic, environmental and institutional factors were considered. Seven specific hypothetical designs were examined in detail, including vertical, bulb, cross-flow and tubular turbine designs. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and benefits. From an economic standpoint, it was found that the most cost-effective design for developing the site, although profitable, would not be financially attractive to the owner compared to other investment opportunities with which the company is faced. The projected after-tax return on investment for the project, based on current costs, was projected to be from 2 to 6%, depending upon the depreciation basis used. The project would, however, have a favorable effect on the corporation's working capital. The environmental issues associated with the development of the site would be relatively minor. The most important consequence would be enhanced public safety due to structural repairs to the dam and the availability of a small, independent source of electric generation that could be called on in times of power outages or natural disaster.

Not Available

1979-03-01T23:59:59.000Z

224

Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.  

DOE Green Energy (OSTI)

This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

Bissell, Gael

1985-01-01T23:59:59.000Z

225

Wildlife and Wildlife Habitat Mitigation Plan for Libby Hydroelectric Project, Final Report.  

DOE Green Energy (OSTI)

This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Libby hydroelectric project. Mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. The report describes mitigation that has already taken place and 8 recommended mitigation projects designed to complete total wildlife mitigation. 8 refs., 2 figs., 12 tabs.

Mundinger, John

1985-01-01T23:59:59.000Z

226

Western Area Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

227

Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake  

DOE Green Energy (OSTI)

In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

O'Connor, D.

1980-08-01T23:59:59.000Z

228

Conventional Hydropower Technologies (Fact Sheet), Wind And Water Power Program (WWPP)  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Power Water Power Program supports the development of technologies that harness the nation's renewable hydropower resources to generate environmentally sustainable and cost-effective electricity. Most conventional hydropower plants use a diver- sion structure, such as a dam, to capture water's potential energy via a turbine for electricity generation. The program's conventional hydropower activities focus on increasing generating capacity and efficiency at existing hydroelectric facilities, adding hydroelectric generating capacity to exist- ing non-powered dams, adding new low impact hydropower, increasing advanced pumped-storage hydropower capacity, and reducing potential environmental impacts of conven- tional hydropower production. The program's research and

229

Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)  

DOE Green Energy (OSTI)

The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

Not Available

1980-05-01T23:59:59.000Z

230

SOUTHWESTERN POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

01 01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

231

SOUTHWESTERN POWER ADMINISTRATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9/01 9/01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

232

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Skip Navigation Links Skip Navigation Links Annual Performance Plan Annual Report Mission Organization Strategic Plan SWPA - Overview Video System Map About the Agency Southwestern Power Administration was established in 1943 by the Secretary of the Interior as a Federal Agency that today operates within the Department of Energy under the authority of Section 5 of the Flood Control Act of 1944. As one of four Power Marketing Administrations in the United States, Southwestern markets hydroelectric power in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas from 24 U.S. Army Corps of Engineers multipurpose dams. By law, Southwestern's power is marketed and delivered primarily to public bodies such as rural electric cooperatives and municipal utilities. Southwestern has over one hundred such "preference" customers, and these

233

"1. Colstrip","Coal","PPL Montana LLC",2094 "2. Noxon Rapids","Hydroelectric","Avista Corp",568  

U.S. Energy Information Administration (EIA) Indexed Site

Montana" Montana" "1. Colstrip","Coal","PPL Montana LLC",2094 "2. Noxon Rapids","Hydroelectric","Avista Corp",568 "3. Libby","Hydroelectric","USCE-North Pacific Division",525 "4. Hungry Horse","Hydroelectric","U S Bureau of Reclamation",428 "5. Yellowtail","Hydroelectric","U S Bureau of Reclamation",287 "6. Kerr","Hydroelectric","PPL Montana LLC",206 "7. Fort Peck","Hydroelectric","USCE-Missouri River District",200 "8. J E Corette Plant","Coal","PPL Montana LLC",154 "9. Judith Gap Wind Energy Center","Other Renewables","Invenergy Services LLC",135

234

ENGINEERING STUDY ON UNDERGROUND CONSTRUCTION OF NUCLEAR POWER REACTORS  

SciTech Connect

The advantages, disadvantages, and cost of constructing a auclear power reactor underground are outlinedData on underground construction of hydroelectric plants, other structures, and underground reactor projects in Norway and Sweden are reviewed. A hypothetical underground Experimental Boiling Water Reactor design and sketch are given with cost estimates(T.R.H.)

Beck, C.

1958-04-15T23:59:59.000Z

235

Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation  

DOE Green Energy (OSTI)

Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

Hildebrand, S.G. (ed.)

1980-10-01T23:59:59.000Z

236

Real Time Runoff Forecasts for Two Hydroelectric Stations Based on Satellite Snow Cover Monitoring  

E-Print Network (OSTI)

Seasonal and short-term runoff forecasts for two hydroelectric stations in the upper Rhine basin are carried out in real time based on snow cover monitoring by Landsat and SPOT satellites. Evaluation of snow reserves on 1 April 1993 from satellite data reveals uncertainties in estimates using point measurements on the ground as index. Runoff is computed by the SRM model with snow covered areas as well as temperature and precipitation forecasts as input variables. A SRM menu system has been installed for operational data acquisition and management. The runoff forecasts can be exploited, among other purposes, for optimizing the hydropower production and for timely decisions on the electricity market.

Klaus Seidel; Walter Brüsch; Charlotte Steinmeier; Jaroslav Martinec; Jürg Wiedemeier; Klaus Seidel Walter Br Usch; J Urg Wiedemeier

1995-01-01T23:59:59.000Z

237

Decentralized-coordinated model predictive control for a hydro-power valley  

Science Conference Proceedings (OSTI)

This paper aims at improving control systems for hydro-power production, by combining model predictive control techniques with decomposition-coordination methods for a global optimization over a whole hydro-power valley. It first recalls the model predictive ... Keywords: Case-study validation, Control optimization, Decomposition-coordination, Hydroelectricity, Model predictive control

J. ZáRate FlóRez, J. Martinez, G. BesançOn, D. Faille

2013-05-01T23:59:59.000Z

238

Valuation and Optimal Operation of Electric Power Plants in Competitive Markets  

Science Conference Proceedings (OSTI)

We present an algorithm for the valuation and optimal operation of hydroelectric and thermal power generators in deregulated electricity markets. Real options theory is used to derive nonlinear partial-integro-differential equations (PIDEs) for the valuation ... Keywords: dynamic programming/optimal control: application, finance/asset pricing: pricing power plants as real options, natural resources/energy: deregulated electricity markets

Matt Thompson; Matt Davison; Henning Rasmussen

2004-08-01T23:59:59.000Z

239

Experimental and numerical simulations predictions comparison of power and efficiency in hydraulic turbine  

Science Conference Proceedings (OSTI)

On-site power and mass flow rate measurements were conducted in a hydroelectric power plant (Mexico). Mass flow rate was obtained using Gibson's water hammer-based method. A numerical counterpart was carried out by using the commercial CFD software, ...

Laura Castro; Gustavo Urquiza; Adam Adamkowski; Marcelo Reggio

2011-01-01T23:59:59.000Z

240

Effects of Climate Change on the Hydroelectric The Council is not tasked, nor does it have the resources to resolve existing uncertainties  

E-Print Network (OSTI)

GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian Aquatic Ecosystems NSERC's HydroNet is a national research network aimed at promoting sustainable with Fisheries and Oceans Canada (6 scientists) and 3 major hydroelectric companies (Nalcor, Manitoba Hydro

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Can Fish Morphological Characteristics be Used to Re-design Hydroelectric Turbines?  

Science Conference Proceedings (OSTI)

Safe fish passage affects not only migratory species, but also populations of resident fish by altering biomass, biodiversity, and gene flow. Consequently, it is important to estimate turbine passage survival of a wide range of susceptible fish. Although fish-friendly turbines show promise for reducing turbine passage mortality, experimental data on their beneficial effects are limited to only a few species, mainly salmon and trout. For thousands of untested species and sizes of fish, the particular causes of turbine passage mortality and the benefits of fish-friendly turbine designs remain unknown. It is not feasible to measure the turbine-passage survival of every species of fish in every hydroelectric turbine design. We are attempting to predict fish mortality based on an improved understanding of turbine-passage stresses (pressure, shear stress, turbulence, strike) and information about the morphological, behavioral, and physiological characteristics of different fish taxa that make them susceptible to the stresses. Computational fluid dynamics and blade strike models of the turbine environment are re-examined in light of laboratory and field studies of fish passage effects. Comparisons of model-predicted stresses to measured injuries and mortalities will help identify fish survival thresholds and the aspects of turbines that are most in need of re-design. The coupled model and fish morphology evaluations will enable us to make predictions of turbine-passage survival among untested fish species, for both conventional and advanced turbines, and to guide the design of hydroelectric turbines to improve fish passage survival.

Cada, G. F.; Richmond, Marshall C.

2011-07-19T23:59:59.000Z

242

Estimating carbon dioxide emissions factors for the California electric power sector  

E-Print Network (OSTI)

42 Input actual hydroelectricity production forto replace the loss of hydroelectricity (Table 9). Table 12.years. 3. Input actual hydroelectricity production for 1990

Marnay, Chris; Fisher, Diane; Murtishaw, Scott; Phadke, Amol; Price, Lynn; Sathaye, Jayant

2002-01-01T23:59:59.000Z

243

Preliminary Estimates of Combined Heat and Power Greenhouse Gas Abatement Potential for California in 2020  

E-Print Network (OSTI)

renewables, including hydroelectric. For this analysis, itin 2010 and 33% in 2020. Hydroelectric generation follows aGas Cogeneration Hydroelectric New Renewables Existing

Firestone, Ryan; Ling, Frank; Marnay, Chris; Hamachi LaCommare, Kristina

2007-01-01T23:59:59.000Z

244

of Western Area Power Administration's Cyber Security Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Western Area Power Administration's Cyber Security Program DOE/IG-0873 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 October 22, 2012 MEMORANDUM FOR THE UNDER SECRETARY OF ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Western Area Power Administration's Cyber Security Program" INTRODUCTION AND OBJECTIVE The Department of Energy's Western Area Power Administration (Western) markets and delivers hydroelectric power and related services to 15 states within the central and western United States. As the largest U.S. Power Marketing Administration, millions of households and

245

Program on Technology Innovation: Power Generation and Water Sustainability  

Science Conference Proceedings (OSTI)

This brochure summarizes the Electric Power Research Institute (EPRI) Report 1015371, Program on Technology Innovation: An Energy/Water Sustainability Program for the Electric Power Industry. It presents a research planbased on business, economic, and technical considerationsthat would create and test new technology and science to overcome present and future constraints on thermoelectric and hydroelectric generation resulting from limited fresh water availability. The 10 year plan has an overall budget o...

2007-09-10T23:59:59.000Z

246

Microsoft PowerPoint - Proceedings Cover Sheets  

NLE Websites -- All DOE Office Websites (Extended Search)

J.F. Brennecke, "Anion Effects on Gas Solubility in Ionic Liquids", J. Phys. Chem. B, 2005, 109(13), 6366-6374. M.J. Muldoon, J.L. Anderson, J.K. Dixon, S.N.V.K. Aki, J.F....

247

"1. Beluga","Gas","Chugach Electric Assn Inc",344 "2. George M Sullivan Generation Plant 2","Gas","Anchorage Municipal Light and Power",220  

U.S. Energy Information Administration (EIA) Indexed Site

Alaska" Alaska" "1. Beluga","Gas","Chugach Electric Assn Inc",344 "2. George M Sullivan Generation Plant 2","Gas","Anchorage Municipal Light and Power",220 "3. North Pole","Petroleum","Golden Valley Elec Assn Inc",144 "4. Bradley Lake","Hydroelectric","Homer Electric Assn Inc",126 "5. Anchorage 1","Gas","Anchorage Municipal Light and Power",88 "6. Snettisham","Hydroelectric","Alaska Electric Light&Power Co",78 "7. Bernice Lake","Gas","Chugach Electric Assn Inc",62 "8. Lemon Creek","Petroleum","Alaska Electric Light&Power Co",58

248

Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.  

DOE Green Energy (OSTI)

A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

United States. Bonneville Power Administration.

1993-10-01T23:59:59.000Z

249

Implications of Energy and Ancillary Service Market Structure for Hydroelectric Generation: A Survey of U.S. ISOs  

Science Conference Proceedings (OSTI)

Hydroelectric's superior technical capabilities -- flexibility, fast response, efficiency -- make it especially well suited to providing reserve services in restructured and deregulated markets. A generating unit providing reserves in a deregulated market must understand not only the energy market, but also the interrelated markets for several different classes of reserve services. This report investigates how five U.S. independent service providers (IPOs) provide reserve services.

2001-08-22T23:59:59.000Z

250

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

09 Meeting 09 Meeting 2008 Meeting 2007 Meeting 2006 Meeting 2010 Hydropower Meeting The 2010 Regional Hydropower Council and Meeting were hosted by the Little Rock District of the U.S. Army Corps of Engineers in Branson, Missouri. Click the links below to view materials from the council and meeting. June 8-9, 2010, Council Skip Navigation Links 2010 Hydropower Council Agenda FY 2011 Proposed Project Packet FY 2012 Preliminary Project Packet June 9-10, 2010, Meeting Skip Navigation Links 2010 Hydropower Meeting Agenda AECC Hydroelectric Generation Facilities Corps - New Budget Concept Denison Turbine Rehabilitation Planning Hydrokinetic Projects on the Mississippi River Kansas City District Projects Impacting Federal Power Little Rock District Projects Impacting Federal Hydropower

251

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Conference 2 Conference 2011 Conference 2009 Conference 2008 Conference 2007 Conference 2006 Conference 2010 Hydropower Conference The 2010 Regional Hydropower Council and Conference was hosted by the Little Rock District of the U.S. Army Corps of Engineers in Branson, Missouri. Click the links below to view materials from the council and conference. June 8-9, 2010, Council Skip Navigation Links 2010 Hydropower Council Agenda FY 2011 Proposed Project Packet FY 2012 Preliminary Project Packet June 9-10, 2010, Conference Skip Navigation Links 2010 Hydropower Conference Agenda AECC Hydroelectric Generation Facilities Corps - New Budget Concept Denison Turbine Rehabilitation Planning Hydrokinetic Projects on the Mississippi River Kansas City District Projects Impacting Federal Power

252

Orcas Power & Light - MORE Green Power Program (Washington) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orcas Power & Light - MORE Green Power Program (Washington) Orcas Power & Light - MORE Green Power Program (Washington) Orcas Power & Light - MORE Green Power Program (Washington) < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Home Weatherization Water Wind Other Program Info Funding Source Member Contributions Start Date 07/01/2011 State District of Columbia Program Type Performance-Based Incentive Rebate Amount Varies Provider Orcas Power and Light Cooperative Orcas Power and Light (OPALCO), an electric cooperative serving Washington's San Juan Islands, provides a production-based incentive for residential and commercial members who generate energy from photovoltaics, wind, micro-hydroelectric and other small-scale renewable energy sources. The Member Owned Renewable Energy (MORE) Program is OPALCO's new green

253

FORE-Watch – the clock that tells you when to use: persuading users to align their energy consumption with green power availability  

Science Conference Proceedings (OSTI)

Besides saving energy, using it at the right time (i.e. when there is a supply surplus, and the power is produced by sustainable power sources such as hydroelectricity or wind) is an important possibility to achieve positive effects for the environment. ... Keywords: ambient display, eco-feedback, persuasion, user-centered design

Johann Schrammel; Cornelia Gerdenitsch; Astrid Weiss; Patricia M. Kluckner; Manfred Tscheligi

2011-11-01T23:59:59.000Z

254

Tenderland Power | Open Energy Information  

Open Energy Info (EERE)

Tenderland Power Tenderland Power Jump to: navigation, search Name Tenderland Power Place Seattle, Washington Zip 98101 Sector Biomass, Hydro, Renewable Energy, Solar, Wind energy Product Utility which provides electricity, generated from renewable energy sources such as wind, solar, biomass and hydroelectric. Coordinates 47.60356°, -122.329439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.60356,"lon":-122.329439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

255

Observations of Velocity Conditions near a Hydroelectric Turbine Draft Tube Exit using ADCP Measurements  

Science Conference Proceedings (OSTI)

Measurement of flow characteristics near hydraulic structures is an ongoing challenge because of the need to obtain rapid measurements of time-varying velocity over a relatively large spatial domain. This paper discusses use of an acoustic Doppler current profiler (ADCP) to measure the rapidly diverging flow exiting from an operating hydroelectric turbine draft tube exit. The resolved three-dimensional velocity vectors show a highly complex and helical flow pattern developed near to and downstream of the exit. Velocity vectors were integrated across the exit and we computed an uneven percentage of flow (67%/33%) passing through the two draft tube barrels at a mid-range turbine discharge, consistent with physical model results. In addition to the three-dimensional velocity vectors, the individual one-dimensional velocities measured by each of the four ADCP beams can be separately used as calibration and validation datasets for numerical and physical models. This technique is demonstrated by comparing along-beam ADCP velocity measurements to data collected in a scaled physical model.

Cook, Christopher B.; Richmond, Marshall C.; Serkowski, John A.

2007-10-01T23:59:59.000Z

256

OPPORTUNITIES FOR STUDENT INTERNS/RECENT GRADUATES SOUTHWESTERN POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

ELECTRIC POWER MARKETING ELECTRIC POWER MARKETING OFFICE OF CORPORATE OPERATIONS ELECTRICAL, MECHANICAL, OR INDUSTRIAL ENGINEER Apply at www.usajobs.gov About the Division of Electric Power Marketing: The Division of Electric Power Marketing negotiates, develops, and drafts contracts and technical documents to support Southwestern's mission of marketing and delivering Federal hydropower. The Division also oversees Southwestern's program to replace major electrical and mechanical equipment at U.S. Army Corps of Engineers (Corps) hydroelectric projects. Technical aspects and length of a project's lifecycle can vary by project, but the work generally involves strong project management skills in addition to technical knowledge. Skills Needed: * Basic computer applications (Microsoft Office - Word, Excel, Outlook, etc.)

257

Fabrication and Characterization of Organic/Inorganic Photovoltaic Devices  

E-Print Network (OSTI)

facilities. Worldwide, hydroelectricity and wind are the twothe same with the hydroelectricity power plants; instead of

Guvenc, Ali Bilge

2012-01-01T23:59:59.000Z

258

Cost, Conflict and Climate: U.S. Challenges in the World Oil Market  

E-Print Network (OSTI)

2006 Wind Solar Geothermal Hydroelectric y Coal Wood & Wasteelectricity are nuclear and hydroelectric power. The other

Borenstein, Severin

2008-01-01T23:59:59.000Z

259

Electric Power Annual  

U.S. Energy Information Administration (EIA) Indexed Site

Gases also includes blast furnace gas and other manufactured and waste gases derived from fossil fuels. Prior to 2011, waste heat was included in Natural Gas. Hydroelectric...

260

City of Redding: Lake Redding Power Project, feasibility assessment report  

DOE Green Energy (OSTI)

The feasibility of constructing a low-head hydroelectric power generating facility on the Sacramento River in California was investigated considering technical, economic, legal, and environmental factors. It was concluded that the proposed plant is feasible and, with 5 generating units operating on a gross head of 14 ft, 79 GWh could be generated annually. The cost of the project with a 1984 completion date is estimated at $44.3 million. (LCL)

None

1979-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

SciTech Connect

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

262

Images of energy: Policy perspectives on the introduction of hydroelectricity in Italy, 1882-1914  

Science Conference Proceedings (OSTI)

This study considers the link between energy technologies and cultural attitudes. Contemporary energy policy makers lack the conceptual tools with which to evaluate culturally appropriate energy choices. A way to regain a contextual capability is needed; that is, the capacity to recognize and avert situations where technological advance is insufficiently harmonized with its embedding environment. This study explores how both policy makers and the general public form their [open quotes]images of energy.[close quotes] It does so in three parts, beginning with an examination of the concepts of [open quotes]technology,[close quotes] [open quotes]culture[close quotes] and [open quotes]cognitive map,[close quotes] and an explanation of their interrelationship. The second part presents two historical case-studies of the introduction of hydroelectricity in Italy from 1882-1914. It considers how a relatively unknown technology made its way into urban and rural life, who its primary surveyors were, and how it shaped and was shaped by the cognitive maps of those into whose lives it marched. The final part extends the investigation to contemporary socio-cultural dynamics. Through concepts derived from General System Theory, the process of technological integration is interpreted in light of events that shape the world today. The design of a model to be used by energy makers and educators alike in conceiving culturally attuned energy alternatives is proposed. Such a model would describe energy-related cognitive maps and could serve as the basis for informed decision-making on energy choice at all levels of society. The study concludes with suggestions for a research agenda to further explore individual and collective energy-related cognitive maps.

Laszlo, A.R.

1992-01-01T23:59:59.000Z

263

Portland Company to Receive $1.3 Million to Improve Hydro Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Company to Receive $1.3 Million to Improve Hydro Power Portland Company to Receive $1.3 Million to Improve Hydro Power Technologies Portland Company to Receive $1.3 Million to Improve Hydro Power Technologies September 15, 2009 - 12:00am Addthis Washington, DC - US Energy Secretary Steven Chu today awarded more than $1.3 million to Ocean Renewable Power Company in Portland, Maine to improve the efficiency, flexibility, and environmental performance of hydroelectric energy. The investment will further the nation's supply of domestic clean hydroelectricity through technological innovation and will advance research to maximize the nation's largest renewable energy source. "Hydropower is our largest source of renewable energy and it can play an even bigger role in the further. These investments will create jobs, cut

264

The use of small scale hydroelectric power in South Africa, hydro and economic potential for rural electrification.  

E-Print Network (OSTI)

??Small hydro generation refers to generating capacity of less than 10 MW with the most common being Run-of-River. In South Africa, the level of rural… (more)

Reddy, Devan.

2013-01-01T23:59:59.000Z

265

Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams  

DOE Green Energy (OSTI)

Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

1982-01-01T23:59:59.000Z

266

An Empirical Model of Imperfect Dynamic Competition and Application to Hydroelectricity Storage  

E-Print Network (OSTI)

The Nordic power market presents a unique opportunity for testing the nature and degree of market power in storage behavior due to preciseness of data on market fundamentals determining hydro resource use. We develop an ...

Liski, Matti

2008-01-01T23:59:59.000Z

267

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

268

A Water Conservation Scenario for the Residential and Industrial Sectors in California: Potential Saveings of Water and Related Energy  

E-Print Network (OSTI)

energy was supplied by hydroelectric power. needed for powerprovide flood control, hydroelectric power, and But they areState was generated by hydroelectric power. is also needed

Benenson, P.

2010-01-01T23:59:59.000Z

269

Climate Change Action in Arizona  

E-Print Network (OSTI)

biomass, geothermal, hydroelectric, solar and wind), fuelsuch as nuclear power, hydroelectric power and renewa- blestorage; and a decline in hydroelectric power production to

Owens, Steve

2009-01-01T23:59:59.000Z

270

Opportunities to change development pathways toward lower greenhouse gas emissions through energy efficiency  

E-Print Network (OSTI)

Sustainable development of hydroelectric power. Energy, 20(power plants in place of hydroelectric power for instance,example, although hydroelectric plants have the potential of

Sathaye, Jayant

2010-01-01T23:59:59.000Z

271

Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.  

DOE Green Energy (OSTI)

This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. M

Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

2007-11-13T23:59:59.000Z

272

Jody Sundsted, UGP Power Marketing Manager Lloyd Linke, UGP Operations Manger  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2013 3, 2013 Upper Great Plains Region Recommendation for Western-UGP * Recommendation to pursue formal negotiations with the Southwest Power Pool, a Regional Transmission Organization, concerning membership. - Federal Register Notice (FRN) published November 1, 2013 and is the start of the public comment period. 2 Kick-off Webinar Agenda * Overview - Western Area Power Administration - Upper Great Plains Region * Overview Integrated System (IS) * IS History * IS partners and Future Options * AOS Study Considerations * Where We Are Now and the Next Steps * Meeting Locations 3 Western Area Power Administration Our Power Comes From - Hydroelectric energy produced at Federal generating agencies - Multi-purpose projects - Variable water availability 4 UGP Firm Power Customers

273

Northwest hydroelectric output above five-year range for much of ...  

U.S. Energy Information Administration (EIA)

Sales, revenue and prices, power plants, fuel use, stocks, generation, trade, demand & emissions. ... analysis, and projections integrated across all energy sources.

274

Burbank Water and Power SBX1 2 Compliance Plan  

E-Print Network (OSTI)

impact hydroelectric generation, digester gas, municipal solid waste, landfill gas, ocean wave, ocean

275

NC GreenPower Production Incentive (North Carolina) | Open Energy...  

Open Energy Info (EERE)

Commercial, Industrial, Institutional, Local Government, Nonprofit, Residential, Schools, State Government Eligible Technologies Anaerobic Digestion, Biomass, Hydroelectric,...

276

Microsoft PowerPoint - Cost Escalation.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydroelectric Design Center Hydroelectric Design Center Hydroelectric Design Center " " Cost Trends for Cost Trends for Hydropower Capital Hydropower Capital Replacements" Replacements" Presentation Outline Presentation Outline A little about HDC A little about HDC Cost Escalation of materials Cost Escalation of materials Issues impacting interest & bids Issues impacting interest & bids Discussion Discussion HDC Expertise HDC Expertise Mission Mission The Hydroelectric Design Center performs The Hydroelectric Design Center performs engineering and design, maintains engineering and design, maintains expertise, and develops standards for the expertise, and develops standards for the US Army Corps of Engineers hydroelectric US Army Corps of Engineers hydroelectric

277

Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2001-09-01T23:59:59.000Z

278

Aluminum across the Americas: Caribbean Mobilities and Transnational American Studies  

E-Print Network (OSTI)

zinc, bauxite, and the hydroelectric power needed to smeltto stop the building of a hydroelectric project by the majorbuild the Afobaka hydroelectric dam to power an aluminum

Sheller, Mimi

2013-01-01T23:59:59.000Z

279

Decision-making in Electricity Generation Based on Global Warming Potential and Life-cycle Assessment for Climate Change  

E-Print Network (OSTI)

A case study of a hydroelectric power plant (Glen Canyon)over time. In the case of hydroelectric plants, besidesthe decommissioning of hydroelectric power plants. Although

Horvath, Arpad

2005-01-01T23:59:59.000Z

280

The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh  

E-Print Network (OSTI)

2009 T ABLE 1: L ARGER HYDROELECTRIC AND DIVERSION PROJECTSin the promotion of hydroelectric power is not known. Bothwas primarily focused on hydroelectric power coming from the

Crow, Ben; Singh, Nirvikar

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Sharing the burden of climate change stabilization: An energy sector perspective  

E-Print Network (OSTI)

Diesel Nat. Gas Nuclear Hydroelectric. Biomass Wind Solar (electricity generation from hydroelectric power plants, windWe also observe more hydroelectric power being used in the

Wagner, Fabian; Sathaye, Jayant

2006-01-01T23:59:59.000Z

282

Essays in Applied Microeconomics  

E-Print Network (OSTI)

Air Quality: Evidence from Hydroelectric Licensing Rules 3.1iii Chapter 1 The Power of Hydroelectric Dams: Agglomerationi Contents 1 The Power of Hydroelectric Dams: Agglomeration

Severnini, Edson Roberto

2013-01-01T23:59:59.000Z

283

Coupling Renewable Energy Supply with Deferrable Demand  

E-Print Network (OSTI)

ous systems absorb large amounts of hydroelectric power.that snow melts and hydroelectric power supply increases andwater supplies from hydroelectric dams or discards renewable

Papavasiliou, Anthony

2011-01-01T23:59:59.000Z

284

Prioritizing Climate Change Mitigation Alternatives: Comparing Transportation Technologies to Options in Other Sectors  

E-Print Network (OSTI)

large conventional hydroelectric power, municipal solidconventional large hydroelectric power in the percentage).by states that large hydroelectric is not counted toward the

Lutsey, Nicholas P.

2008-01-01T23:59:59.000Z

285

America's Bottom-Up Climate Change Mitigation Policy  

E-Print Network (OSTI)

large conventional hydroelectric power, municipal solidconventional large hydroelectric power). To quantify theby states that large hydroelectric is not counted toward the

Lutsey, Nicholas P.; Sperling, Dan

2008-01-01T23:59:59.000Z

286

The Transition to a Carbon-Neutral Energy Economy: Exploring UCSD's Role  

E-Print Network (OSTI)

an impact on the amount of hydroelectric power that can besupply of hydropower. Hydroelectric power has significantsnow pack and less hydroelectric energy supply. In addition

2006-01-01T23:59:59.000Z

287

Reservoir Management in Mediterranean Climates through the European Water Framework Directive  

E-Print Network (OSTI)

future use, or for hydroelectric power generation (Palmierias supply, irrigation, hydroelectric power and recreation (for irrigation and hydroelectric purposes. These reservoirs

O'Reilly, Clare; Silberblatt, Rafael

2009-01-01T23:59:59.000Z

288

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

289

Definition: Concentrating solar power | Open Energy Information  

Open Energy Info (EERE)

Dictionary.png Dictionary.png Concentrating solar power Technologies that use mirrors to reflect and concentrate sunlight onto receivers that collect solar energy and convert it to heat. This thermal energy can then be used to produce electricity via a steam turbine or heat engine that drives a generator.[1][2] View on Wikipedia Wikipedia Definition . ]] File:El-v-01 ubt. jpeg Sustainable energy Renewable energy Anaerobic digestion Hydroelectricity · Geothermal Microgeneration · Solar Tidal · Wave · Wind Energy conservation Cogeneration · Energy efficiency Geothermal heat pump Green building · Passive Solar Sustainable transport Plug-in hybrids · Electric vehicles File:Terra- edge blur. png Environment Portal v · d · e Concentrated solar power (also called concentrating solar power, concentrated solar thermal, and CSP) systems use

290

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2012 May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 30, 2012 CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration April 24, 2012 CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG)

291

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Reliability Interconnect DEIS Northeast Reliability Interconnect DEIS S-1 August 2005 SUMMARY S.1 BACKGROUND S.1.1 Purpose and Need for National Environmental Policy Act Review Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by the U.S. Department of Energy (DOE) before electric transmission facilities may be constructed, operated, maintained, or connected at the U.S. international border. Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit, 345,000-volt (345-kV) alternating-current (AC) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine.

292

Wildlife and Wildlife Habitat Mitigation Plan for the Noxon Rapids and Cabinet Gorge Hydroelectric Projects, Final Report.  

DOE Green Energy (OSTI)

Mitigation projects for wildlife species impacted by the Noxon Rapids and Cabinet Gorge hydroelectric projects are recommended. First priority projects encompass the development of long-term wildlife management plans for WWP lands adjacent to the two reservoirs. General objectives for all WWP lands include alternatives designed to protect or enhance existing wildlife habitat. It is also suggested that WWP evaluate the current status of beaver and river otter populations occupying the reservoirs and implement indicated management. Second priority projects include the protection/enhancement of wildlife habitat on state owned or privately owned lands. Long-term wildlife management agreements would be developed with Montana School Trust lands and may involve reimbursement of revenues lost to the state. Third priority projects include the enhancement of big game winter ranges located on Kootenai National Forest lands. 1 ref., 1 fig., 7 tabs.

Bissell, Gael

1985-04-01T23:59:59.000Z

293

Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.  

DOE Green Energy (OSTI)

Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

Noyes, J.H.

1986-02-01T23:59:59.000Z

294

Power System Control Research Issues  

Science Conference Proceedings (OSTI)

... Other Renewables (96,423) • Hydroelectric Pumped Storage (-6,558) • Other (13,977) Page 3. ... (ethanol, biodiesel, methane, etc.) Page 4. ...

2010-08-20T23:59:59.000Z

295

Short-Term Energy Outlook - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Hydroelectric Power Wood Biomass Waste Biomass Wind Geothermal Solar Industrial Sector Total Consumption Hydroelectric Power Wood Biomass Waste ...

296

Evolutionary tristate PSO for strategic bidding of pumped-storage hydroelectric plant  

Science Conference Proceedings (OSTI)

This paper develops bidding strategy for operating multiunit pumped-storage power plant in a day-ahead electricity market. Based on forecasted hourly market clearing price, the objective is to self-schedule and maximize the expected profit of the pumped-storage ... Keywords: bidding strategy, day-aheadmarket, evolutionary tristate particle swarm optimization (ETPSO), pumped-storage, self-scheduling

P. Kanakasabapathy; K. Shanti Swarup

2010-07-01T23:59:59.000Z

297

Electric Power Sector  

Gasoline and Diesel Fuel Update (EIA)

Electric Power Sector Electric Power Sector Hydroelectric Power (a) ............... 0.670 0.785 0.653 0.561 0.633 0.775 0.631 0.566 0.659 0.776 0.625 0.572 2.668 2.605 2.633 Wood Biomass (b) ........................ 0.048 0.043 0.052 0.046 0.045 0.039 0.051 0.052 0.055 0.049 0.060 0.054 0.190 0.187 0.218 Waste Biomass (c) ....................... 0.063 0.064 0.066 0.069 0.061 0.063 0.063 0.064 0.062 0.065 0.068 0.065 0.262 0.250 0.261 Wind ............................................. 0.376 0.361 0.253 0.377 0.428 0.461 0.315 0.400 0.417 0.461 0.340 0.424 1.368 1.604 1.641 Geothermal ................................. 0.036 0.037 0.038 0.039 0.041 0.041 0.041 0.042 0.041 0.040 0.041 0.042 0.149 0.164 0.165 Solar ............................................. 0.007 0.022 0.021 0.014 0.013 0.022 0.026 0.016 0.021 0.048 0.048 0.025 0.064

298

Murray City Power - Net Metering Pilot Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program < Back Eligibility Commercial General Public/Consumer Residential Savings Category Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Utah Program Type Net Metering Provider Murray City Power Under a pilot program, Murray City Power offers net metering to customers that generate electricity using photovoltaic (PV), wind-electric or hydroelectric systems with a maximum capacity of 10 kilowatts (kW).* The utility will install and maintain a revenue meter capable of registering the bi-directional flow of electricity at the customer's facility. Any customer net excess generation (NEG) is carried over to the customer's next bill as a kilowatt-hour credit. Each April, any remaining NEG credits are

299

City of Aspen - Green Power Purchasing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Aspen - Green Power Purchasing City of Aspen - Green Power Purchasing City of Aspen - Green Power Purchasing < Back Eligibility Local Government Savings Category Water Buying & Making Electricity Wind Program Info State Colorado Program Type Green Power Purchasing Provider City of Aspen In 2005, the City of Aspen set a goal to purchase 75% of the city government's energy from renewable sources by 2010. As of December 2006, Aspen had accomplished its goal to provide 75% non-carbon electricity. The city has a new goal of powering 100% of the city-owned buildings with renewable sources by 2020. 27% of the electricity used by the City of Aspen comes from wind turbines located in Kimball, Nebraska. An additional 45% of the City's electricity comes from hydroelectric plants, with an additional plant, the Castle Creek

300

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1998 Annual Report.  

DOE Green Energy (OSTI)

Project 84-014 has been part of the annual integrated and coordinated Columbia River Basin Smolt Monitoring Program since 1984, and currently addresses measure 5.9A.1 of the 1994 Northwest Power Planning Council's (NPPC) Fish and Wildlife Program. This report presents results from the 1998 smolt monitoring at John Day and Bonneville dams and represents the fifteenth annual report under this project.

Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

1999-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Sixth Northwest Conservation and Electric Power Plan Appendix L: Climate Change and Power  

E-Print Network (OSTI)

#12;#12;PACIFICORP'S FINAL LICENSE APPLICATION KLAMATH RIVER HYDROELECTRIC PROJECT FERC NO. 2082 Application (Application) to relicense its Klamath River Hydroelectric Project, FERC Project No. 2082 (Project by ensuring that the characterization and valuation of the project's hydroelectric generation are done

302

The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations  

DOE Green Energy (OSTI)

One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000) found useful turbine passage survival data for only 30 species. Tests of advanced hydropower turbines have been limited to seven species - Chinook and coho salmon, rainbow trout, alewife, eel, smallmouth bass, and white sturgeon. We are investigating possible approaches for extending experimental results from the few tested fish species to predict turbine passage survival of other, untested species (Cada and Richmond 2011). In this report, we define the causes of injury and mortality to fish tested in laboratory and field studies, based on fish body shape and size, internal and external morphology, and physiology. We have begun to group the large numbers of unstudied species into a small number of categories, e.g., based on phylogenetic relationships or ecological similarities (guilds), so that subsequent studies of a few representative species (potentially including species-specific Biological Index Testing) would yield useful information about the overall fish community. This initial effort focused on modifying approaches that are used in the environmental toxicology field to estimate the toxicity of substances to untested species. Such techniques as the development of species sensitivity distributions (SSDs) and Interspecies Correlation Estimation (ICE) models rely on a considerable amount of data to establish the species-toxicity relationships that can be extended to other organisms. There are far fewer studies of turbine passage stresses from which to derive the turbine passage equivalent of LC{sub 50} values. Whereas the SSD and ICE approaches are useful analogues to predicting turbine passage injury and mortality, too few data are available to support their application without some form of modification or simplification. In this report we explore the potential application of a newer, related technique, the Traits-Based Assessment (TBA), to the prediction of downstream passage mortality at hydropower projects.

Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

2012-04-01T23:59:59.000Z

303

Southwestern Federal Power System combined financial statements and supplemental schedules for the years ended September 30, 1994 and 1993  

DOE Green Energy (OSTI)

The Southwestern Federal Power System encompasses the operation of 24 hydroelectric power plants by the US Army Corps of Engineers and the marketing of power and energy from those plants by Southwestern Power Administration of the US Department of Energy. To integrate the operation of these hydroelectric generating plants and to transmit power from the dams to its customers, Southwestern Power Administration (Southwestern) maintains 2,220 kilometers (1,380 miles) of high-voltage transmission lines, 24 substations, and 46 microwave and VHF radio sites. Southwestern`s headquarters are in Tulsa, Oklahoma; its dispatch center is in Springfield, Missouri; and its maintenance crews are based in Jonesboro, Arkansas, in Gore and Tupelo, Oklahoma, and in Springfield, Missouri. Three divisions - Administration and Rates, Power Marketing and Delivery, and Maintenance - are responsible for meeting Southwestern`s mission. Twelve of the 24 generating plants are scheduled directly by Southwestern, and a total of 19 contribute to the interconnected system operations. Generation at the five remaining projects (Denison, Narrows, Sam Rayburn, Whitney, and Willis) is used to serve specific customer loads. At the end of fiscal year 1994, Southwestern marketed power and energy to 10 generation and transmission cooperatives, one distribution cooperative, three military installations, 41 municipal utilities, and three municipal utility joint-action agencies. One of the joint-action agencies has its own allocation of power from Southwestern; the other two serve 34 municipal utilities to whom Southwestern has allocated power. The total number of power allocation customers is 92. Additionally, excess energy is occasionally sold to non-allocation utilities. The primary purposes of Southwestern are to market Federally generated hydroelectric power, operate a reliable and safe transmission system, and encourage energy efficiency for the benefit of the region.

Marwick, P.

1994-12-31T23:59:59.000Z

304

Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Inteconnect (DOE/EIS-0372) (09/12/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Federal Register 6 Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices DEPARTMENT OF ENERGY [Docket No. PP-89-1] Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect AGENCY: Department of Energy. ACTION: Notice of public hearings. SUMMARY: The Department of Energy (DOE) announces two public hearings on the ''Draft Environmental Impact Statement for the Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect'' (DOE/EIS-0372). The Draft EIS was prepared pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended, 42 U.S.C. 4321 et seq., the Council on Environmental Quality NEPA regulations, 40 CFR parts 1500-1508, and the DOE NEPA regulations, 10 CFR part 1021. The U.S. Fish and Wildlife

305

South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.  

DOE Green Energy (OSTI)

The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

United States. Bonneville Power Administration.

1992-07-01T23:59:59.000Z

306

Hydroelectric Assessment Study of Existing and Planned Water Systems on the Big Island  

Science Conference Proceedings (OSTI)

Wind energy is a very promising energy source on the Big Island of Hawaii due to the island's natural geological features and consistent trade winds. However, two primary factors hamper efficient use of wind energy. (1) Power generated by wind energy is somewhat unreliable because it is entirely dependent on real-time wind speeds and direction. (2) While energy can be generated continuously throughout the day and night with adequate winds, grid demand falls off during the late night and early morning hou...

2005-05-02T23:59:59.000Z

307

Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567  

DOE Green Energy (OSTI)

The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

Hildebrand, S.G. (ed.)

1980-08-01T23:59:59.000Z

308

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2002 Annual Report.  

DOE Green Energy (OSTI)

The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River. The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to monitor the timing and magnitude of the juvenile salmonid out-migration in the Columbia Basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time and survival estimates and to build a time series data set for future reference. The purpose of the PSMFC portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville dams.

Martinson, Rick D.; Ballinger, Dean; Kamps, Jeffrey W. (Pacific States Marine Fisheries Commission, Gladstone, OR)

2003-02-01T23:59:59.000Z

309

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1990 Annual Report.  

DOE Green Energy (OSTI)

The seaward migration of salmonid smolts was monitored by the National Marine Fisheries Service (NMFS) at three sites on the Columbia River system in 1990. This project is a part of the continuing Smolt Monitoring Program to monitor Columbia Basin salmonid stocks coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Indian Tribes. It's purpose is to provide timely data to the Fish Passage Managers for in season flow and spill management for fish passage and post-season analysis for travel time, relative magnitude and timing and the smolt migration. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the Smolt Monitoring program, and the Dallas Dam under the Fish Spill Memorandum of Agreement'' for 1990. All pertinent fish capture, condition and brand data, as well as dam operations and river flow data were reported daily to FPC. These data were incorporated into the FPC Fish Passage Data Information System (FPDIS). 10 refs., 8 figs., 1 tab.

Hawkes, Lynette A.

1991-03-01T23:59:59.000Z

310

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1992 Annual Report.  

DOE Green Energy (OSTI)

The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC`s Fish Passage Data System (FPDS).

Hawkes, Lynnette A.; Martinson, Rick D.; Absolon, Randall F. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

1993-05-01T23:59:59.000Z

311

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1993 Annual Report.  

DOE Green Energy (OSTI)

The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis.

Wood, Lynette A.; Graves, Ritchie J.; Killins, Susan D. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

1994-04-01T23:59:59.000Z

312

Nuclear power to the Pacific  

SciTech Connect

The nuclear power industry is increasingly being pressured to export reactors to the Third World. The experiences of the five ASEAN (Association of Southeast Asian Nations) are recounted. To date, only the Philippine Republic has formally committed itself to a nuclear generator. The Republic lacks oil and has only limited hydroelectric potential. Its geothermal energy program is being accelerated. It appears Indonesia will be the next ASEAN country ''to go nuclear'', hoping to have a nuclear plant on-line in 1985. The island of Singapore has been voicing a desire for a nuclear power plant, but the country does not have space for a plant. The possibility of a floating station has been mentioned, but the World Bank does not finance unproved projects. Singapore could obtain an island from Indonesia or share a plant with Malaysia if a plant were built on the mainland of the Malay peninsula. The Thai Energy Generating Authority (EGAT) is preparing ''to go nuclear'' with the emergence of a stable coalition rule in Bangkok; the financial restrictions are discussed. Thailand is diligently searching for its own oil and gas. The article closes by projecting the problem that could arise with IAEA having only 40 inspectors who are charged with monitoring nuclear power plants all over the world. The authors point out that the industrial countries themselves have proved wholly incapable of monitoring their own systems. (MCW)

Wasserman, H.; Wainer, A.

1976-11-01T23:59:59.000Z

313

Analysis of environmental issues related to small-scale hydroelectric development. V. Instream flow needs for fishery resources  

NLE Websites -- All DOE Office Websites (Extended Search)

45b 45b 0554033 I . . ~ ...... . . . . . . . . _ . . _ ~ ~~ ~~ - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - . . . , O R N U T M - 7 8 6 1 Distribution Category UC-97e 0. W-7405-eng-26 ANALYSIS OF ENVIRO RELATED TO SMALL-SCALE HYDROELECTRIC DEVELOPMENT. V. INSTREAM FLOW NEE S FOR FISHERY RESOURCES James M. Loar Michael J. Sale TAL SCIENCES D r v r S - I o N Pub1 i c a t i on No. 1829 Prepared f o r U. S. Department o f Energy, A s s i s t a n t Secretary f o r Conservation and Renewable Energy, D i v i s i o n o f H y d r o e l e c t r i c Resource Development Date Pub1 i shed: October 1981 L Tennessee 37830 UNION CARBIDE ~ O ~ ~ ~ R A T I O N f o r the ENT OF ENERGY 3 445b 0554033 B ACKNOWLEDGMENTS W e thank W i l l i a m Knapp (1I.S. F i s h and W i l d l i f e Service, Region 5) and Mark Robinson (Federal Energy Regulatory Commission) for h

314

Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA  

Science Conference Proceedings (OSTI)

Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

2008-07-29T23:59:59.000Z

315

Energy and Security in Northeast Asia: Supply and Demand, Conflict and  

E-Print Network (OSTI)

Nuclear power and hydroelectricity account for 7 percent andnuclear energy and hydroelectricity constitute 5 percent andIn the long term, hydroelectricity production growth will be

Fesharaki, Fereidun; Banaszak, Sarah; WU, Kang; Valencia, Mark J.; Dorian, James P.

1998-01-01T23:59:59.000Z

316

REGULATION AND SYSTEM INTERDEPENDENCE: EFFECTS ON THE SITING OF CALIFORNIA ELECTRICAL ENERGY FACILITIES  

E-Print Network (OSTI)

nuclear, geothermal and hydroelectric power plants, isENERGY Nuclear Natural gas Hydroelectric Year Notes: a) Coalclusters. First, the hydroelectric plants are clustered in

Kooser, J.C.

2013-01-01T23:59:59.000Z

317

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network (OSTI)

Retirement of Dams and Hydroelectric Facilities. ASCE, Newon the Allier River, a hydroelectric plant in France. Thethe dam generating hydroelectric power versus the ecological

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

318

DISTRIBUTED ENERGY SYSTEMS IN CALIFORNIA'S FUTURE: A PRELIMINARY REPORT, VOLUME I  

E-Print Network (OSTI)

Other Solar Technologies HYDROELECTRIC AND PUMPED STORAGEand Solar Thermal Hydroelectric Power Geothermal . Land UseOcean Wind Geothermal Hydroelectric Ocean Energy Fossil

Authors, Various

2010-01-01T23:59:59.000Z

319

Distribution and movement of domestic rainbow trout, Oncorhynchus mykiss, during pulsed flows in the South Fork American River, California  

E-Print Network (OSTI)

Upper American River Hydroelectric Project, FERC Project No.California, Chili Bar Hydroelectric Project, FERC Projectthe night, as part of hydroelectric power generation by the

2010-01-01T23:59:59.000Z

320

Water and Energy Interactions  

E-Print Network (OSTI)

The most common type of hydroelectric generation takes placethe reservoir and reused. Hydroelectric generation causesand ecosystems (40, Hydroelectric power generation is

McMahon, James E.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Life-Cycle Water Impacts of U.S. Transportation Fuels  

E-Print Network (OSTI)

generation; although hydroelectric dams do not remove anywater consumption: hydroelectric dams. Although not asair, the production of hydroelectric power also results in

Scown, Corinne Donahue

2010-01-01T23:59:59.000Z

322

Distributed Energy Systems in California's Future: A Preliminary Report Volume 2  

E-Print Network (OSTI)

and Solar Thermal Hydroelectric Power Geothermal Land Usenoise 91ALL/LARGE HYDROELECTRIC DAMS significant evaporationthe reservoirs behind hydroelectric dams varies greatly from

Balderston, F.

2010-01-01T23:59:59.000Z

323

DISTRIBUTED ENERGY SYSTEMS IN CALIFORNIA'S FUTURE: A PRELIMINARY REPORT, VOLUME I  

E-Print Network (OSTI)

HYDROELECTRIC AND PUMPED STORAGE RESOURCES GEOTHERMAL ENERGYof Power, Potential Pumped Storage Projects in the Pacificj. HYDROELECTRIC AND PUMPED STORAGE RESOURCES Hydroelectric

Authors, Various

2010-01-01T23:59:59.000Z

324

Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study  

DOE Green Energy (OSTI)

The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

Vaught, Douglas J.

2007-03-31T23:59:59.000Z

325

Power Marketing Administrations Poised to Make Another Big Contribution to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administrations Poised to Make Another Big Marketing Administrations Poised to Make Another Big Contribution to America's Progress Power Marketing Administrations Poised to Make Another Big Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power Marketing Administrations (PMAs), but these four organizations are a crucial part of the country's electricity infrastructure - past, present and future. Starting with the Bonneville Power Administration in 1937, Congress established the Power Marketing Administrations to distribute and sell electricity from a network of more than 130 federally built hydroelectric dams, including the Hoover Dam, the Columbia River dams, and others throughout the United States. While the PMAs -- which also include the

326

Four Dam Pool Power Agency FDPPA | Open Energy Information  

Open Energy Info (EERE)

Dam Pool Power Agency FDPPA Dam Pool Power Agency FDPPA Jump to: navigation, search Name Four Dam Pool Power Agency (FDPPA) Place Anchorage, Alaska Zip 99515 Sector Hydro Product Joint action agency consisting of four hydroelectric projects that was organized by five electric cooperatives that purchase power from the facilities. Coordinates 38.264985°, -85.539014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.264985,"lon":-85.539014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

327

Libby Dam Hydro-electric Project Mitigation: Efforts for Downstream Ecosystem Restoration.  

DOE Green Energy (OSTI)

Construction of Libby Dam, a large hydropower and flood control dam occurred from 1966 to 1975 on the Kootenai River, near Libby, Montana in the Northwestern United States. Live reservoir storage is substantial, with water residence time of about 5 1/2 months (based on mean annual discharge of about 440 m{sup 3}/s). Downstream river discharge and thermal regimes and the dependent habitat conditions have been significantly altered by dam construction and operation relative to pre-dam conditions. Highly valued Kootenai River fish populations, including white sturgeon Acipenser transmontanus, burbot Lota lota and bull trout Salvelinus confluentus and their supporting ecological conditions have been deteriorating during post-dam years. Measurements of the presence of very low (ultraoligotrophic) concentrations of dissolved phosphorus in the river downstream from Libby Dam were identified as a critical limitation on primary production and overall ecosystem health. A decision was made to initiate the largest experimental river fertilization project to date in the Kootenai River at the Montana-Idaho border. Pre-treatment aquatic biomonitoring began in 2001; post-treatment monitoring began in 2005. A solar-powered nutrient addition system was custom designed and built to dose small releases of dissolved nutrients at rates from 10 to 40 L/hour, depending on river discharge, which averaged several hundred m3/s. Closely monitored experimental additions of ammonium polyphosphate solution (10-34-0) into the river occurred during the summers of 2005 through 2008. Targets for mixed in-river P concentrations were 1.5 {micro}g/L in 2005, and 3 {micro}g/L in subsequent years. Primary productivity and algal accrual rates along with invertebrate and fish community metrics and conditions were consistently measured annually, before and after experimental fertilization. Initial results from the program are very encouraging, and are reported.

Holderman, Charles

2009-02-10T23:59:59.000Z

328

Galena Electric Power A Situational Analysis  

DOE Green Energy (OSTI)

The purpose of the investigation is to compare the economics of various electrical power generation options for the City of Galena. Options were assessed over a 30-year project period, beginning in 2010, and the final results were compared on the basis of residential customer electric rates ($/kWh). Galena's electric utility currently generates power using internal combustion diesel engines and generator sets. Nearby, there is an exposed coal seam, which might provide fuel for a power plant. Contributions to the energy mix might come from solar, municipal solid waste, or wood. The City has also been approached by Toshiba, Inc., as a demonstration site for a small (Model 4S) nuclear reactor power plant. The Yukon River is possibly a site for in-river turbines for hydroelectric power. This report summarizes the comparative economics of various energy supply options. This report covers: (1) thermal and electric load profiles for Galena; (2) technologies and resources available to meet or exceed those loads; (3) uses for any extra power produced by these options; (4) environmental and permitting issues and then; and (5) the overall economics of each of the primary energy options.

Robert E. Chaney; Stephen G. Colt; Ronald A. Johnson; Richard W. Wiles; Gregory J. White

2008-12-31T23:59:59.000Z

329

Nebraska - State Energy Profile Analysis - U.S. Energy ...  

U.S. Energy Information Administration (EIA)

... hydroelectric, geothermal electric, anaerobic digestion, and small hydroelectric power generation. Nebraska also has a statewide building energy ...

330

The Bonneville Flood Debris Field as Sacred Landscape  

E-Print Network (OSTI)

Area for the CJ Strike Hydroelectric Plant, Idaho PowerWithin the Proposed Dike Hydroelectric Project Impact Area.

Pavesic, Max G

2007-01-01T23:59:59.000Z

331

Environmental Audit of the Alaska Power Administration  

DOE Green Energy (OSTI)

This report documents the results of the Comprehensive Baseline Environmental Audit of the Alaska Power Administration (APA) headquartered in Juneau, Alaska. This Audit was conducted by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) from August 24 to December 8, 1992. The scope of the Audit was comprehensive, covering all environmental programs and activities with the exception of those relating to the National Environmental Policy Act (NEPA). Specifically considered was the compliance status of APA regarding Federal, state, and local statutes and regulations, DOE Orders and Directives, and best management practices. The technical disciplines addressed by the Audit were: air, surface water/drinking water, groundwater, waste management, toxic and chemical materials, quality assurance, inactive waste sites, and environmental management. Due to the nature of the activities carried out at the two Federal hydroelectric projects operated by APA, the area of radiation was not investigated during the Audit.

Not Available

1992-10-01T23:59:59.000Z

332

Environmental Audit of the Alaska Power Administration  

DOE Green Energy (OSTI)

This report documents the results of the Comprehensive Baseline Environmental Audit of the Alaska Power Administration (APA) headquartered in Juneau, Alaska. This Audit was conducted by the US Department of Energy's (DOE's) Office of Environmental Audit (EH-24) from August 24 to December 8, 1992. The scope of the Audit was comprehensive, covering all environmental programs and activities with the exception of those relating to the National Environmental Policy Act (NEPA). Specifically considered was the compliance status of APA regarding Federal, state, and local statutes and regulations, DOE Orders and Directives, and best management practices. The technical disciplines addressed by the Audit were: air, surface water/drinking water, groundwater, waste management, toxic and chemical materials, quality assurance, inactive waste sites, and environmental management. Due to the nature of the activities carried out at the two Federal hydroelectric projects operated by APA, the area of radiation was not investigated during the Audit.

Not Available

1992-10-01T23:59:59.000Z

333

SENSIBLE HEAT STORAGE FOR A SOLAR THERMAL POWER PLANT  

E-Print Network (OSTI)

to electricity. Pumped-hydroelectric storage and batteryis pumped between the heat exchangers and the storage unit.

Baldwin, Thomas F.

2011-01-01T23:59:59.000Z

334

Microsoft PowerPoint - Why Nuclear Energy New Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Nuclear Energy? Why Nuclear Energy? Why Nuclear Energy? Nuclear energy already meets a significant share of the world's energy needs * There are 441 nuclear reactors in operation in 31 countries * These plants generate electricity for nearly a billion people, and account for 17% of the world's electricity production * The U.S. has 103 operating reactors producing 20% of the nation's electricity * Illinois leads all states with the highest share of nuclear (51%) * Technology significantly developed at Argonne forms the basis of all nuclear energy systems used worldwide Nuclear power is reliable and economical * In 2001, U.S. nuclear plants produced electricity for 1.68 cents per kilowatt-hour on average, second only to hydroelectric power among baseload generation options * U.S. nuclear power plant performance has steadily

335

Factors affecting the failure of copper connectors brazed to copper bus bar segments on a 615-MVA hydroelectric generator at Grand Coulee Dam  

DOE Green Energy (OSTI)

On March 21, 1986, the United States Bureau of Reclamation experienced a ground fault in the main parallel ring assembly of Unit G19 - a 615-MVA hydroelectric generator - at Grand Coulee Dam, Washington. Inspection of the unit revealed that the ground fault had been induced by fracture of one or more of the copper connectors used to join adjacent segments of one of the bus bars in the north half of the assembly. Various experimental techniques were used to detect and determine the presence of cracks, crack morphology, corrosion products, and material microstructure and/or embrittlement. The results of these inspections and recommendations are given. 7 refs., 27 figs.

Atteridge, D.G.; Klein, R.F.; Layne, R.; Anderson, W.E.; Correy, T.B.

1988-01-01T23:59:59.000Z

336

"1. Coal Creek","Coal","Great River Energy",1133 "2. Antelope Valley","Coal","Basin Electric Power Coop",900  

U.S. Energy Information Administration (EIA) Indexed Site

Dakota" Dakota" "1. Coal Creek","Coal","Great River Energy",1133 "2. Antelope Valley","Coal","Basin Electric Power Coop",900 "3. Milton R Young","Coal","Minnkota Power Coop, Inc",697 "4. Leland Olds","Coal","Basin Electric Power Coop",670 "5. Garrison","Hydroelectric","USCE-Missouri River District",508 "6. Coyote","Coal","Otter Tail Power Co",427 "7. Stanton","Coal","Great River Energy",202 "8. Tatanka Wind Power LLC","Other Renewables","Acciona Wind Energy USA LLC",180 "9. Langdon Wind LLC","Other Renewables","FPL Energy Langdon Wind LLC",159

337

Office of Inspector General report on audit of Southwestern Federal Power System combined financial statements and supplemental schedules (with independent auditors` reports thereon) for the years ended September 30, 1997 and 1996  

DOE Green Energy (OSTI)

Southwestern Federal Power System (SWFPS) encompasses the operation of 24 hydroelectric power plants by the US Army Corps of Engineers and the marketing of power and energy from those plants by the Southwestern Power Administration (Southwestern) of the US Department of Energy. This report presents the results of the independent certified public accountants` audit of the SWFPS`s combined power system statements of assets, Federal investments and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows.

NONE

1998-10-06T23:59:59.000Z

338

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

339

Falls Creek Hydroelectric Project  

DOE Green Energy (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

340

Greetings from Kyoto-U SPRING 2002 C O N T E N T S  

E-Print Network (OSTI)

-conventional/unconventional resources; Geothermal power; Geology of Uranium; Oceanography of tidal power; Hydroelectric power; Ocean

Takada, Shoji

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Sanderson, P., Memisevic, R., & Wong, B.-L. W. (2004). Analysing cognitive work of hydroelectricity generation in a dynamic deregulated market. Paper to be published in Proceedings of the 48th  

E-Print Network (OSTI)

electrical generation in the developed world is now conducted within deregulated energy markets, providing. The market component of the work domain analysis appears not to be readily amendable to breakdown); (Vicente, 1999) for hydroelectricity generation in a deregulated market in a way that usefully informs

Queensland, University of

342

"1. Chalk Point LLC","Coal","Mirant Chalk Point LLC",2347 "2. Calvert Cliffs Nuclear Power Plant","Nuclear","Calvert Cliffs Nuclear PP Inc",1705  

U.S. Energy Information Administration (EIA) Indexed Site

Maryland" Maryland" "1. Chalk Point LLC","Coal","Mirant Chalk Point LLC",2347 "2. Calvert Cliffs Nuclear Power Plant","Nuclear","Calvert Cliffs Nuclear PP Inc",1705 "3. Morgantown Generating Plant","Coal","Mirant Mid-Atlantic LLC",1477 "4. Brandon Shores","Coal","Constellation Power Source Gen",1273 "5. Herbert A Wagner","Coal","Constellation Power Source Gen",976 "6. Dickerson","Coal","Mirant Mid-Atlantic LLC",844 "7. NAEA Rock Springs LLC","Gas","NAEA Rock Springs LLC",652 "8. Conowingo","Hydroelectric","Exelon Power",572

343

Clean Power Concepts | Open Energy Information  

Open Energy Info (EERE)

Clean Power Concepts Clean Power Concepts Place Vancouver, British Columbia, Canada Zip V6B 1G1 Sector Hydro, Solar, Wind energy Product Clean Power aims to be a one-stop shop for retail, business-to-business and e-commerce sales of wind, solar, and hydroelectric generators. The company plans to open its first retail branch in western Canada in June. Coordinates 49.26044°, -123.114034° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.26044,"lon":-123.114034,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

344

Life-cycle analysis results of geothermal systems in comparison to other power systems.  

DOE Green Energy (OSTI)

A life-cycle energy and greenhouse gas emissions analysis has been conducted with Argonne National Laboratory's expanded Greenhouse Gases, Regulated Emissions, and Energy Use in Transportation (GREET) model for geothermal power-generating technologies, including enhanced geothermal, hydrothermal flash, and hydrothermal binary technologies. As a basis of comparison, a similar analysis has been conducted for other power-generating systems, including coal, natural gas combined cycle, nuclear, hydroelectric, wind, photovoltaic, and biomass by expanding the GREET model to include power plant construction for these latter systems with literature data. In this way, the GREET model has been expanded to include plant construction, as well as the usual fuel production and consumption stages of power plant life cycles. For the plant construction phase, on a per-megawatt (MW) output basis, conventional power plants in general are found to require less steel and concrete than renewable power systems. With the exception of the concrete requirements for gravity dam hydroelectric, enhanced geothermal and hydrothermal binary used more of these materials per MW than other renewable power-generation systems. Energy and greenhouse gas (GHG) ratios for the infrastructure and other life-cycle stages have also been developed in this study per kilowatt-hour (kWh) of electricity output by taking into account both plant capacity and plant lifetime. Generally, energy burdens per energy output associated with plant infrastructure are higher for renewable systems than conventional ones. GHG emissions per kWh of electricity output for plant construction follow a similar trend. Although some of the renewable systems have GHG emissions during plant operation, they are much smaller than those emitted by fossil fuel thermoelectric systems. Binary geothermal systems have virtually insignificant GHG emissions compared to fossil systems. Taking into account plant construction and operation, the GREET model shows that fossil thermal plants have fossil energy use and GHG emissions per kWh of electricity output about one order of magnitude higher than renewable power systems, including geothermal power.

Sullivan, J. L.; Clark, C. E.; Han, J.; Wang, M.; Energy Systems

2010-10-11T23:59:59.000Z

345

Power Sales to Electric Utilities  

SciTech Connect

The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

None

1989-02-01T23:59:59.000Z

346

Power Sales to Electric Utilities  

SciTech Connect

The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

1989-02-01T23:59:59.000Z

347

The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh  

E-Print Network (OSTI)

hydro. International Hydro Power and Dam Construction.suggested) Supply of hydro-electric power * Supply of waterrights ? Supply of hydro-electric power ? Supply of water

Crow, Ben; Singh, Nirvikar

2009-01-01T23:59:59.000Z

348

Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year contract to purchase the electrical output from a natural gas fired combustion turbine facility at a total cost of about $2.2 billion. Bonneville's resource acquisitions were to be made only after its planning process showed that demand for its electricity would exceed its available resources. In

349

ECO J/F_13_Part_1_3-25  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 eco JANUARY/FEBRUARY 2013 FEATU RE STOR Y By: Robert Vagnetti, Ray Boswell, and Skip Pratt U.S. Department of Energy, National Energy Technology Laboratory R Researching the Climate Change Implications of Methane Hydrates Since 2001, the U.S. Department of Energy (DOE), through its National Energy Technology Laboratory (NETL), has been working with industry and academia to assess the potential of methane hydrates as a future source of natural gas. Nicknamed "fire in ice" by researchers at NETL, methane hydrates are frozen hydrogen-bonded lattices of water that form polyhedral cavities large enough to accommodate methane molecules, Photo credit: NETL. 29 eco JANUARY/FEBRUARY 2013 While this effort has been the prime focus for NETL, a desire to fully understand all the implica-

350

ECO J/F_13_Part_1_3-25  

NLE Websites -- All DOE Office Websites (Extended Search)

National Energy Technology Laboratory R Researching the Climate Change Implications of Methane Hydrates Since 2001, the U.S. Department of Energy (DOE), through its National Energy...

351

ENVIRONMENTAL LAW IN BRAZIL- ANALYSIS OF ENVIRONMENTAL LICENSING OF WIND POWER PLANTS IN PERMANENT PRESERVATION AREAS  

E-Print Network (OSTI)

The Brazilian electric energy matrix is mostly renewable. According to the Generation Information Base (BIG) of the Brazilian Electricity Regulatory Agency (ANEEL), hydroelectricity is responsible for 67.31 % of the country's energy. The additional generation comes mostly from fossil fuels, which’s use is questioned when it comes to environmental quality and climate change. Despite its abundance, hydroelectric power generation has physical, socioeconomic and environmental limitations. Thus, it is essential to develop alternative technologies, providing security in the supply of electric energy and the maintenance of a clean matrix. Among the alternative technologies available, wind power is the one that has been gaining prominence, domestically and internationally speaking. In the last auction of renewable sources held in August 2010 in Brazil, the energy produced by the plants of sugarcane bagasse (biomass) was traded at an average of R $ 144.20 MWh; wind energy, which was the cheapest, was traded at R $ 130.86, and the energy from small hydropower plants (PCH), at R $ 141.93 MWh. The wind power plants accounted for 70 % of the auction, which resulted in a plan for increasing its installed capacity by fivefold, by the year 2013. Brazil has great potential to be explored (estimated 143,000 MW), yet despite being appealing, wind energy still

Cristiano Abijaode Amaral; Adriana Coli Pedreira

2010-01-01T23:59:59.000Z

352

Southwestern Federal Power System 1995 Financial Statement audit under the Chief Financial Officers Act (WR-FC-96-02)  

DOE Green Energy (OSTI)

The Southwestern Federal Power System encompasses the operation of 24 hydroelectric power plants by the U.S. Army Corps of Engineers and the marketing of power and energy from those plants by the Southwestern Power Administration of the U.S. Department of Energy. To integrate the operation of these hydroelectric generating plants and to transmit power from the dams to its customers, Southwestern Power Administration (Southwestern) maintains 2,220 kilometers (1,380 miles) of high-voltage transmission lines, 24 substations, and 46 microwave and VHF radio sites. Southwestern`s headquarters are in Tulsa, Oklahoma; its dispatch center is in Springfield, Missouri; and its maintenance crews are based in Jonesboro, Arkansas, in Gore and Tupelo, Oklahoma, and in Springfield, Missouri. Three offices - Power Marketing and Delivery, Maintenance, and Administration and Rates - are responsible for meeting Southwestern`s mission. Twelve of the 24 generating plants are scheduled directly by Southwestern, and a total of 19 contribute to the interconnected system operations. Generation at the five remaining projects (Denison, Narrows, Sam Rayburn, Whitney, and Willis) is used to serve specific customer loads. At the end of fiscal year 1995, Southwestern marketed power and energy to 10 generation and transmission cooperatives, one distribution cooperative, three military installations, 44 municipal utilities, and three municipal utility joint-action agencies. One of the joint-action agencies has its own allocation of power from Southwestern; the other two serve 33 municipal utilities to whom Southwestern has allocated power. The total number of power allocation customers is 92. Additionally, excess energy is occasionally sold to non-allocation utilities.

NONE

1996-02-22T23:59:59.000Z

353

Salt Lake City Area Integrated Projects Electric Power Marketing Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary.html[6/24/2011 3:03:56 PM] Summary.html[6/24/2011 3:03:56 PM] SUMMARY S.1 DESCRIPTION OF THE PROPOSED ACTION The Western Area Power Administration (Western) proposes to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects (SLCA/IP) hydroelectric power plants. Power generated by the SLCA/IP facilities or purchased by Western from other sources is provided to Western's customers under contracts that establish the terms for how capacity (generation capacity) and energy (quantity of electrical energy) are to be sold. The contracts also specify amounts of capacity and energy that Western agrees to offer for long-term (greater than 12 months) sale to its customers. These amounts constitute Western's

354

Power Electronics  

Energy.gov (U.S. Department of Energy (DOE))

Power electronics (PE) play a critical role in transforming the current electric grid into the next-generation grid.  PE enable utilities to deliver power to their customers effectively while...

355

Wind Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Power As the accompanying map of New Mexico shows, the best wind power generation potential near WIPP is along the Delaware Mountain ridge line of the southern Guadalupe Mountains,...

356

Power Supplies  

Science Conference Proceedings (OSTI)

Figure: ...Fig. 5 Typical medium-frequency induction power supply incorporating (a) a parallel inverter and (b) a series inverter...

357

Power supply  

DOE Patents (OSTI)

A modular, low weight impedance dropping power supply with battery backup is disclosed that can be connected to a high voltage AC source and provide electrical power at a lower voltage. The design can be scaled over a wide range of input voltages and over a wide range of output voltages and delivered power.

Yakymyshyn, Christopher Paul (Seminole, FL); Hamilton, Pamela Jane (Seminole, FL); Brubaker, Michael Allen (Loveland, CO)

2007-12-04T23:59:59.000Z

358

Alternative Power & Energy Grant Program (Indiana) | Open Energy...  

Open Energy Info (EERE)

Anaerobic Digestion, Small Hydroelectric Active Incentive No Implementing Sector StateTerritory Energy Category Renewable Energy Incentive Programs Amount 50% of project...

359

Guide to Purchasing Green Power: Renewable Electricity, Renewable...  

NLE Websites -- All DOE Office Websites (Extended Search)

generated from a subset of renewable resources, including solar, wind, geothermal, biogas, biomass, and low-impact hydroelectric sources. These electricity sources are derived...

360

Optimal Sliding Mode Gaussian Control of Hydro Power Plants.  

E-Print Network (OSTI)

??This thesis presents a study of a hydroelectric plant under different control strategies for load frequency control. Both isolated systems and systems connected to a… (more)

Rittenhouse, Benjamin

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft PowerPoint - Cost Estimating for Hydro Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Estimating for Hydropower Project Planning M Th Mona Thomason Chief, Product Coordination Branch Hydroelectric Design Center 13 J 2012 13 June 2012 US Army Corps of Engineers...

362

NREL: Power Technologies Energy Data Book - Technology Cross...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Energy Data Book Home Table of Contents Browse by Technology Biomass Geothermal Hydroelectric Solar Wind Calculators Archives Contact Us Technology Cross Reference...

363

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Canadian Entitlement Allocation Extension Agreements Record of Decision; April 29, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River System Operation Review Columbia River System Operation Review Final Environmental Impact Statement Canadian Entitlement Allocation Extension Agreements Record of Decision Summary The Administrator and Chief Executive Officer (CEO) of the Bonneville Power Administration (BPA), acting for BPA, and, as Chairman of the United States Entity (the Administrator and the Division Engineer, North Pacific Division of the United States Army Corps of Engineers), acting on behalf of the United States Entity, has decided to adopt for the Canadian Entitlement Allocation Extension Agreements (CEAEA) a federal hydroelectric projects allocation of 72.5 percent and a non-Federal hydroelectric projects allocation of 27.5 percent. The Columbia River Treaty (Treaty), ratified in 1964, required the construction of three

364

Ahuachapan Geothermal Power Plant, El Salvador  

DOE Green Energy (OSTI)

The Ahuachapan geothermal power plant has been the subject of several recent reports and papers (1-7). This article is a condensation of the author's earlier writings (5-7), and incorporates new information on the geothermal activities in El Salvador obtained recently through a telephone conversation with Ing. R. Caceres of the Comision Ejecutiva Hidroelectrica del Rio Lempa (C.E.L.) who has been engaged in the design and engineering of the newest unit at Ahuachapan. El Salvador is the first of the Central American countries to construct and operate a geothermal electric generating station. Exploration began in the mid-1960's at the geothermal field near Ahuachapan in western El Salvador. The first power unit, a separated-steam or so-called ''single-flash'' plant, was started up in June 1975, and was followed a year later by an identical unit. In July 1980, the Comision Ejecutiva Hidroelectrica del Rio Lempa (C.E.L.) will complete the installation of a third unit, a dual-pressure (or ''double-flash'') unit rated at 35 MW. The full Ahuachapan plant will then constitute about 20% of the total installed electric generating capacity of the country. During 1977, the first two units generated nearly one-third of all the electricity produced in El Salvador. C.E.L. is actively pursuing several other promising sites for additional geothermal plants. There is the possibility that eventually geothermal energy will contribute about 450 MW of electric generating capacity. In any event it appears that by 1985 El Salvador should be able to meet its domestic needs for electricity by means of its indigenous geothermal and hydroelectric power plants, thus eliminating any dependence on imported petroleum for power generation.

DiPippo, Ronald

1980-12-01T23:59:59.000Z

365

Energy and Security in Northeast Asia  

E-Print Network (OSTI)

hydroelectric power, and biomass combustion over the next 50on hydroelectric power and biomass combustion, as well asconsequences of biomass combustion. 11 There are economic

May, Michael; Johnson, Celeste; Fei, Edward; Suzuki, Tatsujiro

1996-01-01T23:59:59.000Z

366

Table 8.2a Electricity Net Generation: Total (All Sectors ...  

U.S. Energy Information Administration (EIA)

Power: Hydro-electric Pumped Storage 5: Renewable Energy: Other 10: Total: Coal 1: Petroleum 2: Natural Gas 3: Other Gases 4: Total: Conventional Hydroelectric Power ...

367

Alaska Power Administration Federal Power Program financial statements with supplementary information September 30, 1994 and September 30, 1993 with auditors` reports thereon  

SciTech Connect

The attached report presents the results of our audit of the Department of Energy`s Alaska Power Administration (APA) financial statements as of September 30, 1994. In our opinion, the APA statements are fairly presented in all material respects in accordance with generally accepted accounting principles. our reports on the APA internal control structure and on its compliance with laws and regulations are also provided. The US Government, through the Department of Energy, operates APA at two sites to provide hydroelectric power to Juneau and Anchorage, Alaska. Additional information about APA is provided in the notes to the financial statements. The 1994 financial statement audit was made under provisions of the Inspector General Act (5 USC. App.), as amended, the Chief Financial Officers (CFO) Act (31 USC 1500) and the Office of Management and Budget implementing guidance to the CFO Act. The auditors` work was conducted in accordance with generally accepted government auditing standards.

NONE

1995-02-13T23:59:59.000Z

368

Putting Economic Power In Distributed Power t  

U.S. Energy Information Administration (EIA)

Putting Economic Power in Distributed Power. A distributed electricity generation system, often called distributed power, usually consists of ...

369

Power Marketing  

NLE Websites -- All DOE Office Websites (Extended Search)

Certificate Solicitations Benefit Review Energy Services Rates and Repayment WindHydro Integration Feasibility Study Send correspondence to: Power Marketing Manager Western...

370

Water Power for a Clean Energy Future (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet provides an overview of the U.S. Department of Energy's Wind and Water Power Program's water power research activities. Water power is the nation's largest source of clean, domestic, renewable energy. Harnessing energy from rivers, manmade waterways, and oceans to generate electricity for the nation's homes and businesses can help secure America's energy future. Water power technologies fall into two broad categories: conventional hydropower and marine and hydrokinetic technologies. Conventional hydropower facilities include run-of-the-river, storage, and pumped storage. Most conventional hydropower plants use a diversion structure, such as a dam, to capture water's potential energy via a turbine for electricity generation. Marine and hydrokinetic technologies obtain energy from waves, tides, ocean currents, free-flowing rivers, streams and ocean thermal gradients to generate electricity. The United States has abundant water power resources, enough to meet a large portion of the nation's electricity demand. Conventional hydropower generated 257 million megawatt-hours (MWh) of electricity in 2010 and provides 6-7% of all electricity in the United States. According to preliminary estimates from the Electric Power Resource Institute (EPRI), the United States has additional water power resource potential of more than 85,000 megawatts (MW). This resource potential includes making efficiency upgrades to existing hydroelectric facilities, developing new low-impact facilities, and using abundant marine and hydrokinetic energy resources. EPRI research suggests that ocean wave and in-stream tidal energy production potential is equal to about 10% of present U.S. electricity consumption (about 400 terrawatt-hours per year). The greatest of these resources is wave energy, with the most potential in Hawaii, Alaska, and the Pacific Northwest. The Department of Energy's (DOE's) Water Power Program works with industry, universities, other federal agencies, and DOE's national laboratories to promote the development and deployment of technologies capable of generating environmentally sustainable and cost-effective electricity from the nation's water resources.

Not Available

2012-03-01T23:59:59.000Z

371

Solar Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Power Solar Power Project Opportunities Abound in the Region The WIPP site is receives abundant solar energy with 6-7 kWh/sq meter power production potential As the accompanying map of New Mexico shows, the WIPP site enjoys abundant year-round sunshine. With an average solar power production potential of 6-7 kWh/sq meter per day, one exciting project being studied for location at WIPP is a 30-50 MW Solar Power Tower: The American Solar Energy Society (ASES) is is a national trade association promoting solar energy as a clean source of electricity, and provides a comprehensive resource for additional information. DOE's Office of Energy Efficiency and Renewable Energy is also a comprehensive resource for more information on renewable energy.

372

Power system  

DOE Patents (OSTI)

A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

Hickam, Christopher Dale (Glasford, IL)

2008-03-18T23:59:59.000Z

373

The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities  

Science Conference Proceedings (OSTI)

Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

Colotelo, Alison HA; Pflugrath, Brett D.; Brown, Richard S.; Brauner, Colin J.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiqun; Ahmann, Martin L.; Trumbo, Bradly A.

2012-10-01T23:59:59.000Z

374

The Influence of Tag Presence on the Mortality of Juvenile Chinook Salmon Exposed to Simulated Hydroturbine Passage: Implications for Survival Estimates and Management of Hydroelectric Facilities  

Science Conference Proceedings (OSTI)

Each year, millions of fish have telemetry tags (acoustic, radio, inductive) surgically implanted to assess their passage and survival through hydropower facilities. One route of passage of particular concern is through hydro turbines, in which fish may be exposed to a range of potential injuries, including barotraumas from rapid decompression. The change in pressure from acclimation to exposure (nadir) has been found to be an important factor in predicting the likelihood of mortality and injury for juvenile Chinook salmon undergoing rapid decompression associated with simulated turbine passage. The presence of telemetry tags has also been shown to influence the likelihood of injury and mortality for juvenile Chinook salmon. This research investigated the likelihood of mortality and injury for juvenile Chinook salmon carrying telemetry tags and exposed to a range of simulated turbine passage. Several factors were examined as predictors of mortal injury for fish undergoing rapid decompression, and the ratio of pressure change and tag burden were determined to be the most predictive factors. As the ratio of pressure change and tag burden increase, the likelihood of mortal injury also increases. The results of this study suggest that previous survival estimates of juvenile Chinook salmon passing through hydro turbines may have been biased due to the presence of telemetry tags, and this has direct implications to the management of hydroelectric facilities. Realistic examples indicate how the bias in turbine passage survival estimates could be 20% or higher, depending on the mass of the implanted tags and the ratio of acclimation to exposure pressures. Bias would increase as the tag burden and pressure ratio increase, and have direct implications on survival estimates. It is recommended that future survival studies use the smallest telemetry tags possible to minimize the potential bias that may be associated with carrying the tag.

Carlson, Thomas J.; Brown, Richard S.; Stephenson, John R.; Pflugrath, Brett D.; Colotelo, Alison HA; Gingerich, Andrew J.; Benjamin, Piper L.; Langeslay, Mike; Ahmann, Martin L.; Johnson, Robert L.; Skalski, John R.; Seaburg, Adam; Townsend, Richard L.

2012-05-01T23:59:59.000Z

375

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

376

Southeastern Federal Power Program. Combined financial statements, September 30, 1996 and 1995  

SciTech Connect

The Southeastern Federal Power Program (SEFPP) consists of all activities associated with the production, transmission and disposition of Federal power marketed under Section 5 of the Flood Control Act of 1944 from projects in the ten southeastern states. The ten states are: Virginia, West Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Tennessee, and Kentucky. Power is marketed to customers in 11 states - the above ten plus Illinois. SEFPP includes the accounts of two separate Federal government agencies- the Southeastern Power Administration (Southeastern) of the Department of Energy and the U.S. Army Corps of Engineers (Corps). Southeastern purchases, transmits, and markets power within four separate power systems (each including one or more Corps generating projects for which rates are set). Specific and joint-use costs allocated to power are included in the attached statements of assets. Federal investment and liabilities under utility plant and cash. The accounts of SEFPP are maintained in conformity with generally accepted accounting principles and the Uniform System of Accounts prescribed for electric utilities by the Federal Energy Regulatory Commission (FERC). SEFPP`s accounting policies also reflect requirements of specific legislation and executive directives issued by the applicable government agencies. Southeastern and Corps properties and income are exempt from taxation. Southeastern and the Corps receive Congressional appropriations through the Department of Energy (DOE) and the Department of Defense to finance their operations. The Corps also receives Congressional appropriations to finance construction of its hydroelectric projects.

1998-05-01T23:59:59.000Z

377

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

378

Green Power Network: Green Power Marketing  

NLE Websites -- All DOE Office Websites (Extended Search)

to main content U.S. Department of Energy Energy Efficiency and Renewable Energy Green Power Network About the GPN Green Power Markets Buying Green Power Onsite Renewable...

379

Power inverters  

DOE Patents (OSTI)

Power inverters include a frame and a power module. The frame has a sidewall including an opening and defining a fluid passageway. The power module is coupled to the frame over the opening and includes a substrate, die, and an encasement. The substrate includes a first side, a second side, a center, an outer periphery, and an outer edge, and the first side of the substrate comprises a first outer layer including a metal material. The die are positioned in the substrate center and are coupled to the substrate first side. The encasement is molded over the outer periphery on the substrate first side, the substrate second side, and the substrate outer edge and around the die. The encasement, coupled to the substrate, forms a seal with the metal material. The second side of the substrate is positioned to directly contact a fluid flowing through the fluid passageway.

Miller, David H. (Redondo Beach, CA); Korich, Mark D. (Chino Hills, CA); Smith, Gregory S. (Woodland Hills, CA)

2011-11-15T23:59:59.000Z

380

Dam break risk assessment in Baker Valley (Chilean Patagonia).  

E-Print Network (OSTI)

??An hydroelectric project was proposed by HidroAysen Company in the Aysen Region of Chilean Patagonia. It consisted of the installation of five hydroelectric power stations,… (more)

Natale, Elisabetta

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Short-Term Energy Outlook - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

a: Conventional hydroelectric power only. Hydroelectricity generated by pumped storage is not included in renewable energy. b: Wood and wood-derived ...

382

Essays on energy and environmental policy  

E-Print Network (OSTI)

2009), Impact of pumped storage on power systems withcompressed air energy storage, pumped hydroelectric stor-energy is pumped hydroelectric storage (PHS). Electricity

Novan, Kevin Michael

2012-01-01T23:59:59.000Z

383

You are writing a summary article ...  

Science Conference Proceedings (OSTI)

... hydroelectricity? Could Hydroelectric power replace fossil fuels and what is the cost per kWh? What are the environmental impacts? ...

2013-05-16T23:59:59.000Z

384

New Brunswick/EZFeed Policies | Open Energy Information  

Open Energy Info (EERE)

Brunswick Climate Policies Yes BiomassBiogas Concentrating solar power Energy Storage Fuel Cells Geothermal Electric Hydroelectric energy Small Hydroelectric Photovoltaics Tidal...

385

10. Renewable Energy  

U.S. Energy Information Administration (EIA)

Hydroelectric Powerb Otherc Renewable Energy a See Table 10.1 for definition. b Conventional hydroelectric power. c Geothermal, solar/PV, and wind.

386

Energy Perspectives: Fossil fuels dominate U.S. energy consumption ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration - EIA ... which includes conventional hydroelectric power, geothermal, solar thermal, photovoltaic, and wind.

387

2 Research Activities 2012 Kyoto, the University and the City  

E-Print Network (OSTI)

. Development of the first hydroelectric power plant and trams as well as Japan's first industrial exposition

Takada, Shoji

388

2 Research Activities 2012 Kyoto, the University and the City  

E-Print Network (OSTI)

first kindergarten and first public library. It also had the nation's first hydroelectric power plant

Takada, Shoji

389

An SQP-type solution method for constrained discrete-time optimal control problems  

Science Conference Proceedings (OSTI)

Keywords: constrained optimal control, discrete-time systems, hydroelectric power-station systems, structured nonlinear programming

E. Arnold; H. Puta

1994-03-01T23:59:59.000Z

390

2 Research Activities 2012 Kyoto: The University and the City  

E-Print Network (OSTI)

first kindergarten and first public library. It also had the nation's first hydroelectric power plant

Takada, Shoji

391

Tennessee Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Tennessee's hydroelectric dams and nuclear power stations make the state an energy supplier to the Southeast.

392

Energy Perspectives: Fossil fuels dominate U.S. energy ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration - EIA ... which includes conventional hydroelectric power, geothermal, solar thermal, photovoltaic, and wind.

393

Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Right. Power Smart. Efficient Computer Power Supplies and Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. March 10, 2009 - 6:00am Addthis John Lippert Power supplies convert the AC power that you get from your electric company into the DC power consumed by most electronics, including your computer. We expect our power supplies to be safe, reliable, and durable. If they meet those criteria, then they're all alike, except for cost, right? Well, not exactly. You see, there's one other important feature that sets them apart: efficiency. And I don't know about you, but I believe waste is bad. For me, high efficiency is one important feature that's needed for something to be high quality. So isn't it ridiculous that most power

394

Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Right. Power Smart. Efficient Computer Power Supplies and Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. March 10, 2009 - 6:00am Addthis John Lippert Power supplies convert the AC power that you get from your electric company into the DC power consumed by most electronics, including your computer. We expect our power supplies to be safe, reliable, and durable. If they meet those criteria, then they're all alike, except for cost, right? Well, not exactly. You see, there's one other important feature that sets them apart: efficiency. And I don't know about you, but I believe waste is bad. For me, high efficiency is one important feature that's needed for something to be high quality. So isn't it ridiculous that most power

395

River flow forecasting with constructive neural network  

Science Conference Proceedings (OSTI)

In utilities using a mixture of hydroelectric and non-hydroelectric power, the economics of the hydroelectric plants depend upon the reservoir height and the inflow into the reservoir for several months into the future. Accurate forecasts of reservoir ...

Mêuser Valença; Teresa Ludermir; Anelle Valença

2005-12-01T23:59:59.000Z

396

Regulatory Science in a Developing State: Environmental Politics in Chile, 1980-2010  

E-Print Network (OSTI)

M. , & Bauer, C. (2012). Hydroelectric power generation into office. HidroAysén hydroelectric dam EIA submitted ch. 6to build five mega-hydroelectric dams in the Patagonia, that

Barandiaran, Javiera

2013-01-01T23:59:59.000Z

397

Power Supplies  

Science Conference Proceedings (OSTI)

Table 2   Characteristics of the four major power sources for induction heating...state 180 Hz to 50 kHz 1 kW to 2 MW 75â??95 No standby current; high efficiency; no moving parts;

398

OpenEI - Hydroelectric Conventional  

Open Energy Info (EERE)

industrial, transportation and electricity) and by energy source (e.g. solar, biofuel) for 2004 through 2008. Original sources for data are cited on spreadsheet. Also...

399

Modeling the Benefits of Storage Technologies to Wind Power  

DOE Green Energy (OSTI)

Rapid expansion of wind power in the electricity sector is raising questions about how wind resource variability might affect the capacity value of wind farms at high levels of penetration. Electricity storage, with the capability to shift wind energy from periods of low demand to peak times and to smooth fluctuations in output, may have a role in bolstering the value of wind power at levels of penetration envisioned by a new Department of Energy report ('20% Wind by 2030, Increasing Wind Energy's Contribution to U.S. Electricity Supply'). This paper quantifies the value storage can add to wind. The analysis was done employing the Regional Energy Deployment System (ReEDS) model, formerly known as the Wind Deployment System (WinDS) model. ReEDS was used to estimate the cost and development path associated with 20% penetration of wind in the report. ReEDS differs from the WinDS model primarily in that the model has been modified to include the capability to build and use three storage technologies: pumped-hydroelectric storage (PHS), compressed-air energy storage (CAES), and batteries. To assess the value of these storage technologies, two pairs of scenarios were run: business-as-usual, with and without storage; 20% wind energy by 2030, with and without storage. This paper presents the results from those model runs.

Sullivan, P.; Short, W.; Blair, N.

2008-06-01T23:59:59.000Z

400

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Nuclear Power  

E-Print Network (OSTI)

The world of the twenty first century is an energy consuming society. Due to increasing population and living standards, each year the world requires more energy and new efficient systems for delivering it. Furthermore, the new systems must be inherently safe and environmentally benign. These realities of today's world are among the reasons that lead to serious interest in deploying nuclear power as a sustainable energy source. Today's nuclear reactors are safe and highly efficient energy systems that offer electricity and a multitude of co-generation energy products ranging from potable water to heat for industrial applications. The goal of the book is to show the current state-of-the-art in the covered technical areas as well as to demonstrate how general engineering principles and methods can be applied to nuclear power systems.

Tsvetkov, Pavel

2010-08-01T23:59:59.000Z

402

Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG&E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it`s new marketing plan.

Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

1996-11-01T23:59:59.000Z

403

Power supply  

SciTech Connect

An electric power supply employs a striking means to initiate ferroelectric elements which provide electrical energy output which subsequently initiates an explosive charge which initiates a second ferroelectric current generator to deliver current to the coil of a magnetic field current generator, creating a magnetic field around the coil. Continued detonation effects compression of the magnetic field and subsequent generation and delivery of a large output current to appropriate output loads.

Hart, Edward J. (Albuquerque, NM); Leeman, James E. (Albuquerque, NM); MacDougall, Hugh R. (Albuquerque, NM); Marron, John J. (Albuquerque, NM); Smith, Calvin C. (Amarillo, TX)

1976-01-01T23:59:59.000Z

404

Power Search  

NLE Websites -- All DOE Office Websites (Extended Search)

You are here: Find a Car Home > Power Search You are here: Find a Car Home > Power Search Power Search Expand any feature by selecting its title bar. Choose as many or as few features as you like. Model Year From: 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 1989 1988 1987 1986 1985 1984 To: 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990 1989 1988 1987 1986 1985 1984 MSRP Under $15,000 $15,000-$20,000 $20,000-$25,000 $25,000-$30,000 $30,000-$35,000 $35,000-$40,000 $40,000-$45,000 $45,000-$50,000 $50,000-$55,000 $55,000-$60,000 $60,000-$65,000 $65,000-$70,000 $70,000-$75,000 $75,000-$80,000 $80,000-$85,000 Over $85,000 - OR - Minimum: Select... $5,000 $6,000 $7,000 $8,000 $9,000 $10,000 $11,000

405

Feasibility study of low-head hydrolectric power on Carlyle Reservoir for the Carlyle, Illinois Municipal Electric Utility - City of Carlyle, Illinois  

DOE Green Energy (OSTI)

The feasibility of the city of Carlyle, Illinois developing hydroelectric power on Carlyle Reservoir was determined. The hydrologic conditions under which the proposed project would operate were investigated herein along with the marketability of production from the facility and the facility's compatability with present reservoir functions as well as with the environment. A conceptual plant design has been developed in detail for a power plant consisting of two horizontal shaft, adjustable blade, fixed vane hydroelectric turbines each connected through speed increasing gear boxes to 4375 kW generators. The site selected is west of and immediately adjacent to the stilling basin of the spillway for Carlyle Reservoir. Two 13.5 penstocks would be bored through the existing concrete non-overflow dam adjacent to the present gated spillway structure. The total estimated project cost is $7,550,000 or an average of $863.00 per installed kilowatt. The development of the proposed project is believed to require 45 months and will produce an estimated average annual output of approximately 21,500,000 kWh. The conceptual design herein developed is believed to have the capability of an eventual detailed engineering design which will be acceptable to all approving authorities, and particularly the U.S. Corps of Engineers.

Not Available

1979-03-01T23:59:59.000Z

406

Low Power Design Low PowerLow Power  

E-Print Network (OSTI)

, correlations among system state transitions #12;Low Power Design USC/LPCAD Page 11 USCUSC Low PowerLow Power for the requestsIncoming rates for the requests 21,rr 12 ,rr, :, : State transition ratesState transition rates OS and hardware Abstract, hierarchical finite-state machine Each state represents power

Pedram, Massoud

407

Power management system  

DOE Patents (OSTI)

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

408

Solar powered desalination system  

E-Print Network (OSTI)

1.13: California Power Generation by Source……………………………………31for hydro- electric power generation would be reached inother end users include the power generation industry (4%),

Mateo, Tiffany Alisa

2011-01-01T23:59:59.000Z

409

Solar powered desalination system  

E-Print Network (OSTI)

2008, uses concentrated solar power to split water. Figurethe main reason the potential for solar power is boundless.a clean energy source, solar power is inexhaustible, fairly

Mateo, Tiffany Alisa

2011-01-01T23:59:59.000Z

410

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

POTC Home Courses Instructors NERC Continuing Education Virtual University Power Operations Training Center You'll find the "Power" of learning at Southwestern's Power Operations...

411

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedules Skip Navigation Links Excess Energy Hydro Peaking Power Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative (Rayburn) Hydro Power and Energy Sold to Sam...

412

Hybrid-Intelligent POWER “HI-POWER  

Science Conference Proceedings (OSTI)

... T T T A A A SMART-T Current Situation Current Situation ... Page 10. 22 Power Grid • Plug & Play architecture • Multiple power sources • Renewables ...

2013-09-22T23:59:59.000Z

413

Power oscillator  

DOE Patents (OSTI)

An oscillator includes an amplifier having an input and an output, and an impedance transformation network connected between the input of the amplifier and the output of the amplifier, wherein the impedance transformation network is configured to provide suitable positive feedback from the output of the amplifier to the input of the amplifier to initiate and sustain an oscillating condition, and wherein the impedance transformation network is configured to protect the input of the amplifier from a destructive feedback signal. One example of the oscillator is a single active element device capable of providing over 70 watts of power at over 70% efficiency. Various control circuits may be employed to match the driving frequency of the oscillator to a plurality of tuning states of the lamp.

Gitsevich, Aleksandr (Montgomery Village, MD)

2001-01-01T23:59:59.000Z

414

POWER REACTOR  

DOE Patents (OSTI)

A fast nuclear reactor system ls described for producing power and radioactive isotopes. The reactor core is of the heterogeneous, fluid sealed type comprised of vertically arranged elongated tubular fuel elements having vertical coolant passages. The active portion is surrounded by a neutron reflector and a shield. The system includes pumps and heat exchangers for the primary and secondary coolant circuits. The core, primary coolant pump and primary heat exchanger are disposed within an irapenforate tank which is filled with the primary coolant, in this case a liquid metal such as Na or NaK, to completely submerge these elements. The tank is completely surrounded by a thick walled concrete shield. This reactor system utilizes enriched uranium or plutonium as the fissionable material, uranium or thorium as a diluent and thorium or uranium containing less than 0 7% of the U/sup 235/ isotope as a fertile material.

Zinn, W.H.

1958-07-01T23:59:59.000Z

415

Power plant  

SciTech Connect

A two stroke internal combustion engine is described that has at least one cylinder within which a piston reciprocates. The engine is joined to a gearbox which includes a ring gear. A pair of gears having diameters half that of the ring gear move within the latter. At least one of the pair of gears is connected to a piston by a pin extending between the piston and the periphery of said gear. An additional pair of gears are fixed to respective ones of the first-mentioned gear pair and are operatively joined to a pinion to which a drive shaft is secured. A turbine and filter arrangement is positioned on the side of the engine opposite the gearbox whereby exhaust gases from the engine are directed to the turbine to develop power at an output drive shaft joined to the turbine and to filter pollutants from the gases.

Finn, H.I. Jr.

1978-10-24T23:59:59.000Z

416

Microsoft PowerPoint - Cost Estimating for Hydro Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Estimating Estimating for Hydropower Project Planning M Th Mona Thomason Chief, Product Coordination Branch Hydroelectric Design Center 13 J 2012 13 June 2012 US Army Corps of Engineers BUILDING STRONG ® Overview Overview  Background g  USACE hydropower project cost estimating y p p j g process  Challenges in cost estimating & strategies for mitigation of cost risk BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 2 USACE regulations USACE regulations  ER 1110-1-1300 Cost Engineering Policy and General Requirements  ER 1110-2-1150 Engineering and Design for Civil Works Project  ER 1110-2-1302 Civil Works Cost Engineering ETL 1110 2 573 C t ti C t E ti ti  ETL 1110-2-573 Construction Cost Estimating Guide for Civil Works BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 3 Hydroelectric

417

Green Power Marketing in the United States: A Status Report;...  

NLE Websites -- All DOE Office Websites (Extended Search)

2003, program demand was met by existing small hydroelectric (52%), solar (0.1%), and biogas energy (38%), as well 26 as a purchase of wind energy (10%). As local and regional...

418

Green Power Marketing in the United States: A Status Report ...  

NLE Websites -- All DOE Office Websites (Extended Search)

2003, program demand was met by existing small hydroelectric (52%), solar (0.1%), and biogas energy (38%), as well as a purchase of wind energy (10%). In 2004, program demand was...

419

Table 4. Electric Power Industry Capability by Primary Energy...  

U.S. Energy Information Administration (EIA) Indexed Site

2,4802,4932,4800,4800,4800,4800,2529,2529,"-","-","-","-","-","-","-","-",5.9,"-" " Hydroelectric",640,644,644,652,653,680,683,686,694,691,696,690,690,692,661,666,674,666,665,682,6...

420

Table 4. Electric Power Industry Capability by Primary Energy...  

U.S. Energy Information Administration (EIA) Indexed Site

","-","-","-","-","-","-","-","-","-","-","-","-",696,675,450,450,450,450,"-",2.7 " Hydroelectric",108,108,108,108,105,58,55,98,102,98,50,50,46,44,86,63,63,63,63,63,84,0.3,0.5...

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Diagnosing Unilateral Market Power in Electricity Reserves Market  

E-Print Network (OSTI)

conventional hydro (HY), pumped storage hydro (HYPS), 15for a gas unit with Pumped storage hydroelectricity is aup and replacement from pumped storage hydro, as well as Q3

Knittel, Christopher R; Metaxoglou, Konstantinos

2008-01-01T23:59:59.000Z

422

Electric Power Annual  

U.S. Energy Information Administration (EIA)

Electric Power Sector ; Period Total (all sectors) Electric Utilities Independent Power Producers Commercial Sector Industrial Sector; Annual Totals: ...

423

Electric Power Metrology Portal  

Science Conference Proceedings (OSTI)

... Electric Power Metrology and the Smart Grid Our country's way of life depends on the electric power distribution system. ...

2012-12-26T23:59:59.000Z

424

Putting Economic Power in Distributed Power  

Reports and Publications (EIA)

Electric Power Research Institute's Distributed Resources Week 1997 (October 22, 1997)AUTHOR: John Herbert

Information Center

1997-10-22T23:59:59.000Z

425

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984  

DOE Green Energy (OSTI)

At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

None

1984-01-01T23:59:59.000Z

426

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983  

DOE Green Energy (OSTI)

At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983.

None

1983-01-01T23:59:59.000Z

427

Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309  

DOE Green Energy (OSTI)

This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

Anderson, K.

2012-04-01T23:59:59.000Z

428

From: Joe St Sauver, Ph.D., PO Box 3504, Eugene OR 97403 ...  

Science Conference Proceedings (OSTI)

... Energy production and delivery infrastructure (nuclear power plants, hydroelectric dams, gas pipelines, coal-fired power plants, petroleum ...

2013-04-09T23:59:59.000Z

429

Life-Cycle Water Impacts of U.S. Transportation Fuels  

E-Print Network (OSTI)

hydroelectric power plants (although operators can choose to shut generatorshydroelectric power that it generates. Because the wind or solar generators

Scown, Corinne Donahue

2010-01-01T23:59:59.000Z

430

Wisconsin Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Wisconsin households use 103 million Btu of site energy per home, ... Electric Power Industry Emissions: ... hydroelectric power, biomass, geothermal technology, ...

431

Protection from ground faults in the stator winding of generators at power plants in the Siberian networks  

SciTech Connect

The experience of many years of experience in developing and utilization of ground fault protection in the stator winding of generators in the Siberian networks is generalized. The main method of protection is to apply a direct current or an alternating current with a frequency of 25 Hz to the primary circuits of the stator. A direct current is applied to turbo generators operating in a unit with a transformer without a resistive coupling to the external grid or to other generators. Applying a 25 Hz control current is appropriate for power generation systems with compensation of a capacitive short circuit current to ground. This method forms the basis for protection of generators operating on busbars, hydroelectric generators with a neutral grounded through an arc-suppression reactor, including in consolidated units with generators operating in parallel on a single low-voltage transformer winding.

Vainshtein, R. A., E-mail: vra@tpu.ru [Tomsk Polytechnical University (Russian Federation); Lapin, V. I. [ODU Sibiri (Integrated Dispatcher Control for Siberia), branch of JSC 'SO EES' (Russian Federation); Naumov, A. M.; Doronin, A. V. [JSC NPP 'EKRA' (Russian Federation); Yudin, S. M. [Tomsk Polytechnical University (Russian Federation)

2010-05-15T23:59:59.000Z

432

Power-Pro: Programmable Power Management Architecture  

E-Print Network (OSTI)

This paper presents Power-Pro architecture (Programmable Power Management Architecture), a novel processor architecture for power reduction. Power-Pro architecture has following two functionalities, (i) Supply voltage and clock frequency can be dynamically varied, (ii) Active data-path width can be dynamically adjusted to requirement of application programs. For the application programs which require less performance or less data-path width, Power-Pro architecture realize dramatic power reduction. I. Introduction With recent popularizations in portable, batterypowered devices such as digital cellular telephones and personal digital assistants, minimizing power consumption of VLSI circuits becomes more important. As the system level power reduction techniques, the choice of optimal supply voltage(V DD ) and optimal active data-path width have strong impacts. In this paper we propose novel processor architecture Power-Pro [2] which can vary VDD and active data-path width of processor ...

Tohru Ishihara; Hiroto Yasuura; Programmable Power Management

1998-01-01T23:59:59.000Z

433

Electric power 2007  

SciTech Connect

Subjects covered include: power industry trends - near term fuel strategies - price/quality/delivery/opportunity; generating fleet optimization and plant optimization; power plant safety and security; coal power plants - upgrades and new capacity; IGCC, advanced combustion and CO{sub 2} capture technologies; gas turbine and combined cycle power plants; nuclear power; renewable power; plant operations and maintenance; power plant components - design and operation; environmental; regulatory issues, strategies and technologies; and advanced energy strategies and technologies. The presentations are in pdf format.

NONE

2007-07-01T23:59:59.000Z

434

Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase I, Volume Two (A), Clark Fork Projects, Thompson Falls Dam, Operator, Montana Power Company.  

DOE Green Energy (OSTI)

The Thompson Falls Dam inundated approximately 347 acres of wildlife habitat that likely included conifer forests, deciduous bottoms, mixed conifer-deciduous forests and grassland/hay meadows. Additionally, at least one island, and several gravel bars were inundated when the river was transformed into a reservoir. The loss of riparian and riverine habitat adversely affected the diverse wildlife community inhabiting the lower Clark Fork River area. Quantitative loss estimates were determined for selected target species based on best available information. The loss estimates were based on inundation of the habitat capable of supporting the target species. Whenever possible, loss estimates bounds were developed by determining ranges of impacts based on density estimates and/or acreage loss estimates. Of the twelve target species or species groups, nine were assessed as having net negative impacts. 86 refs., 2 figs., 5 tabs.

Wood, Marilyn

1984-03-27T23:59:59.000Z

435

SOLAR POWER  

DOE Green Energy (OSTI)

Thermal energy storage (TES) is an integral part of a concentrated solar power (CSP) system. It enables plant operators to generate electricity beyond on sun hours and supply power to the grid to meet peak demand. Current CSP sensible heat storage systems employ molten salts as both the heat transfer fluid and the heat storage media. These systems have an upper operating temperature limit of around 400 C. Future TES systems are expected to operate at temperatures between 600 C to 1000 C for higher thermal efficiencies which should result in lower electricity cost. To meet future operating temperature and electricity cost requirements, a TES concept utilizing thermochemical cycles (TCs) based on multivalent solid oxides was proposed. The system employs a pair of reduction and oxidation (REDOX) reactions to store and release heat. In the storage step, hot air from the solar receiver is used to reduce the oxidation state of an oxide cation, e.g. Fe3+ to Fe2+. Heat energy is thus stored as chemical bonds and the oxide is charged. To discharge the stored energy, the reduced oxide is re-oxidized in air and heat is released. Air is used as both the heat transfer fluid and reactant and no storage of fluid is needed. This project investigated the engineering and economic feasibility of this proposed TES concept. The DOE storage cost and LCOE targets are $15/kWh and $0.09/kWh respectively. Sixteen pure oxide cycles were identified through thermodynamic calculations and literature information. Data showed the kinetics of re-oxidation of the various oxides to be a key barrier to implementing the proposed concept. A down selection was carried out based on operating temperature, materials costs and preliminary laboratory measurements. Cobalt oxide, manganese oxide and barium oxide were selected for developmental studies to improve their REDOX reaction kinetics. A novel approach utilizing mixed oxides to improve the REDOX kinetics of the selected oxides was proposed. It partially replaces some of the primary oxide cations with selected secondary cations. This causes a lattice charge imbalance and increases the anion vacancy density. Such vacancies enhance the ionic mass transport and lead to faster re-oxidation. Reoxidation fractions of Mn3O4 to Mn2O3 and CoO to Co3O4 were improved by up to 16 fold through the addition of a secondary oxide. However, no improvement was obtained in barium based mixed oxides. In addition to enhancing the short term re-oxidation kinetics, it was found that the use of mixed oxides also help to stabilize or even improve the TES properties after long term thermal cycling. Part of this improvement could be attributed to a reduced grain size in the mixed oxides. Based on the measurement results, manganese-iron, cobalt-aluminum and cobalt iron mixed oxides have been proposed for future engineering scale demonstration. Using the cobalt and manganese mixed oxides, we were able to demonstrate charge and discharge of the TES media in both a bench top fixed bed and a rotary kiln-moving bed reactor. Operations of the fixed bed configuration are straight forward but require a large mass flow rate and higher fluid temperature for charging. The rotary kiln makes direct solar irradiation possible and provides significantly better heat transfer, but designs to transport the TES oxide in and out of the reactor will need to be defined. The final reactor and system design will have to be based on the economics of the CSP plant. A materials compatibility study was also conducted and it identified Inconel 625 as a suitable high temperature engineering material to construct a reactor holding either cobalt or manganese mixed oxides. To assess the economics of such a CSP plant, a packed bed reactor model was established as a baseline. Measured cobalt-aluminum oxide reaction kinetics were applied to the model and the influences of bed properties and process parameters on the overall system design were investigated. The optimal TES system design was found to be a network of eight fixed bed reactors at 18.75 MWth each with charge and

PROJECT STAFF

2011-10-31T23:59:59.000Z

436

Hydropower Technology Roundup Report: Accommodating Wear and Tear Effects on Hydroelectric Facilities Operating to Provide Ancillary Services: TR-113584-V4  

Science Conference Proceedings (OSTI)

Ancillary services are special generation services necessary to maintain both power quality and system integrity. This report aims to provide useful information on accommodating wear and tear of hydropower units when operated to produce ancillary services. The information contained in this report can help hydro plant owners and operators: o better understand wear and tear effects, o devise strategies to mitigate these effects, and o determine the costs associated with wear and tear. This information shou...

2001-08-30T23:59:59.000Z

437

Power Tower Systems for Concentrating Solar Power  

Energy.gov (U.S. Department of Energy (DOE))

In power tower concentrating solar power systems, numerous large, flat, sun-tracking mirrors, known as heliostats, focus sunlight onto a receiver at the top of a tall tower. A heat-transfer fluid...

438

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16  

SciTech Connect

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

439

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D  

SciTech Connect

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

440

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A  

Science Conference Proceedings (OSTI)

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Resonant Power Conditioning and Compact Pulse Power ...  

Science Conference Proceedings (OSTI)

... (FEEDBACK) HV RECTIFIER AND FILTER NETWORK ... Los Alamos High Frequency “Polyphase Resonant Power Conditioning” ... 30 KW Loss ...

2012-10-31T23:59:59.000Z

442

Dynamic power management with hybrid power sources  

Science Conference Proceedings (OSTI)

DPM (Dynamic Power Management) is an effective technique for reducing the energy consumption of embedded systems that is based on migrating to a low power state when possible. While conventional DPM minimizes the energy consumption of the embedded system, ... Keywords: DPM, embedded system, fuel cell, hybrid power

Jianli Zhuo; Chaitali Chakrabarti; Kyungsoo Lee; Naehyuck Chang

2007-06-01T23:59:59.000Z

443

LIFE Power Plant Fusion Power Associates  

E-Print Network (OSTI)

LIFE Power Plant Fusion Power Associates December 14, 2011 Mike Dunne LLNL #12;NIf-1111-23714.ppt LIFE power plant 2 #12;LIFE delivery timescale NIf-1111-23714.ppt 3 #12;Timely delivery is enabled near-term, NIF based, NIC-derivative fusion performance § 3 allows small, thin Fresnel lenses ­ enables

444

Dynamic power management in environmentally powered systems  

Science Conference Proceedings (OSTI)

In this paper a framework for energy management in energy harvesting embedded systems is presented. As a possible example scenario, we focus on wireless sensor nodes which are powered by solar cells. We demonstrate that classical power management solutions ... Keywords: embedded systems, energy harvesting, model predictive control, power management, real-time scheduling, reward maximization

Clemens Moser; Jian-Jia Chen; Lothar Thiele

2010-01-01T23:59:59.000Z

445

Power and energy  

Science Conference Proceedings (OSTI)

The author examines the development of nuclear power throughout the world, commencing with proposals for California, USA. Evidence that nuclear power remains viable in Asia include Japan Atomic Power Co.'s announcement of plans for a 1300 MW reactor ...

G. Zorpette

1995-01-01T23:59:59.000Z

446

Solar powered desalination system  

E-Print Network (OSTI)

photon capture area and electrical power consumption. Bothcapture area (m 2 ) Electrical power consumption (kWh/kg HType 2 Type 3 Type 4 Electrical power consumption for these

Mateo, Tiffany Alisa

2011-01-01T23:59:59.000Z

447

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

power module - High temperature operation - Size reduction - 3-kW 120V single-phase inverter (250 C+) Input Power Output Power > 90% efficiency (estimated) Phase I: Very High...

448

Green Power Network: Green Power Markets Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Green Markets Green Markets Search Search Help More Search Options Search Site Map News TVA Seeks 126 MW of Renewables in 2014 December 2013 More News More News Subscribe to E-Mail Update Subscribe to e-mail update Events EPA Webinar - The Power of Aggregated Purchasing: How to Green Your Electricity Supply & Save Money January 15, 2014 1:00-2:00 p.m. ET Previous Webinars More News Features Green Power Market Status Report (2011 Data) Featured Green Power Reports Green Pricing Green Power Marketing Green Certificates Carbon Offsets State Policies Overview The essence of green power marketing is to provide market-based choices for electricity consumers to purchase power from environmentally preferred sources. The term "green power" is used to define power generated from renewable energy sources, such as wind and solar power, geothermal, hydropower and various forms of biomass. Green power marketing has the potential to expand domestic markets for renewable energy technologies by fostering greater availability of renewable electric service options in retail markets. Although renewable energy development has traditionally been limited by cost considerations, customer choice allows consumer preferences for cleaner energy sources to be reflected in market transactions. In survey after survey, customers have expressed a preference and willingness to pay more, if necessary, for cleaner energy sources. You can find more information about purchase options on our "Buying Green Power" page.

449

Sunrise II Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sunrise Power Company, LLC (Sunrise), has planned the modification of an existing power plant project to increase its generation capacity by 265 megawatts by 2003. The initial...

450

Siemens Power Generation, Inc.  

NLE Websites -- All DOE Office Websites (Extended Search)

Presented at the 2005 Pittsburgh Coal Conference Siemens Power Generation, Inc. Page 1 of 10 Siemens Power Generation, Inc., All Rights Reserved Development of a Catalytic...

451

Laser Radiometry: Powering Up  

Science Conference Proceedings (OSTI)

... Radiometry: Powering Up. June 11, 2012. ... Contact: Marla Dowell 303-497- 7455. Chris Cromer examines one of PML's next-generation power meters ...

2012-06-14T23:59:59.000Z

452

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

FOIAPrivacy Act Submit a FOIA Request DOE FOIA Requester Service Center Electronic Reading Room FOIA Links Power Marketing Administrations' FOIA Links Bonneville Power...

453

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

302011 Essential PV power plant features Reliable power conversion Extensive service network Remote monitoring & diagnostics Plant level control Advanced grid-friendly features...

454

Radioisotope Power Generation  

NLE Websites -- All DOE Office Websites (Extended Search)

Radioisotope Power Generation Long lived power sources are needed for equipment that is too remote or inaccessible for replacement. By choosing a radioactive element with a long...

455

Electric Power Monthly  

U.S. Energy Information Administration (EIA)

Net Generation by Energy Source: Commercial Combined Heat and Power Sector . Table 1.5. Net Generation by Energy Source: Industrial Combined Heat and Power Sector .

456

Nuclear Fusion Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Nuclear fusion reactors, if they can be made to work, promise virtually unlimited power for the indefinite future. This is because the fuel, isotopes of hydrogen, are...

457

Electrolytes for power sources  

DOE Patents (OSTI)

Electrolytes for power sources, particularly alkaline and acidic power sources, comprising benzene polysulfonic acids and benzene polyphosphonic acids or salts of such acids.

Doddapaneni, Narayan (Albuquerque, NM); Ingersoll, David (Albuquerque, NM)

1995-01-01T23:59:59.000Z

458

Electrolytes for power sources  

DOE Patents (OSTI)

Electrolytes are disclosed for power sources, particularly alkaline and acidic power sources, comprising benzene polysulfonic acids and benzene polyphosphonic acids or salts of such acids. 7 figures.

Doddapaneni, N.; Ingersoll, D.

1995-01-03T23:59:59.000Z

459

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

CT (USA), international presence in USA, Canada, Germany (Fraunhofer, IKTS) and South Korea (Posco) Delivering Direct FuelCell (DFC ) power plants for On-Site Power and...

460

Karnataka Power Corporation Limited and National Thermal Power...  

Open Energy Info (EERE)

Karnataka Power Corporation Limited and National Thermal Power Corporation JV Jump to: navigation, search Name Karnataka Power Corporation Limited and National Thermal Power...

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Energy Storage & Power Electronics 2008 Peer Review - Power Electronic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Power Electronics 2008 Peer Review - Power Electronics (PE) Systems Presentations Energy Storage & Power Electronics 2008 Peer Review - Power Electronics (PE) Systems...

462

Flex power perspectives of indirect power system control through...  

Open Energy Info (EERE)

power perspectives of indirect power system control through dynamic power price (Smart Grid Project) Jump to: navigation, search Project Name Flex power perspectives of indirect...

463

Rural electric cooperatives and the cost structure of the electric power industry: A multiproduct analysis  

SciTech Connect

Since 1935, the federal government of the United States has administered a program designed to make electricity available to rural Americans. This dissertation traces the history of the rural electrification program, as well as its costs. While the Congress intended to simply provide help in building the capital structure of rural electric distribution systems, the program continues to flourish some 35 years after these systems first fully covered the countryside. Once the rural distribution systems were built, the government began to provide cooperatives with billions of dollars in subsidized loans for the generation of electric power. Although this program costs the taxpayers nearly $1 billion per year, no one has ever tested its efficacy. The coops' owner/members do not have the right to trade their individual ownership shares. The RECs do not fully exploit the scale and scope economies observed in the investor-owned sector of this industry. This dissertation compares the relative productive efficiencies of the RECs and the investor-owned electric utilities (IOUs) in the United States. Using multiproduct translog cost functions, the estimated costs of cooperatives are compared to those of IOUs in providing identical output bundles. Three separate products are considered as outputs: (1) wholesale power; (2) power sold to large industrial customers; and (3) power sold to residential and commercial customers. It is estimated that, were the RECs forced to pay market prices for their inputs, their costs would exceed those incurred by the IOUs by about 24 percent. Several policy recommendations are made: (1) the RECs should be converted to stockholder-owned, tax-paying corporations; (2) the government should discontinue its subsidized loan program; (3) the government should sell its hydroelectric power at market prices, nullifying the current preference given to cooperatives and municipal distributors in the purchase of this currently underpriced power.

Berry, D.M.

1992-01-01T23:59:59.000Z

464

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

465

Military power requirements and backup power considerations  

Science Conference Proceedings (OSTI)

All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs.

Botts, T.E.

1986-01-01T23:59:59.000Z

466

Alaska Power Administration combined financial statements, schedules, and supplemental reports, September 30, 1997 and 1996 with independent auditors` report thereon  

SciTech Connect

The Alaska Power Administration (APA) will continue to encourage economic and industrial development in Alaska through implementing the sale of APA assets in a manner consistent with the authorizing legislation while balancing all the stakeholders` interests. Alaska Power Administration will provide their employees opportunities for successful career transitions and conduct an efficient transfer of assets and closeout of APA, while continuing to provide customers reliable, low-cost hydroelectric energy during the transition. The attached report presents the results of the independent certified public accounts` audit of the Alaska Power Administration`s (APA) combined power system statements of assets; Federal investment and liabilities; and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` reports on APA`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance. Based on the unqualified opinion of the independent public accounting firm of KPMG Peak Marwick LLP and review of their audit work, the authors believe the financial statements fairly present the financial condition and results of the operations of APA for the period under audit.

1998-04-01T23:59:59.000Z

467

Transportation and Stationary Power  

E-Print Network (OSTI)

heat, hydrogen and power (CHHP) "trigeneration" systems can hypothetically be configured to provide (1

468

Superconducting Power Equipment  

Science Conference Proceedings (OSTI)

The 2010 Electric Power Research Institute (EPRI) Technology Watch (Techwatch) report on superconducting power applications (EPRI report 1019995, Superconducting Power Equipment: Technology Watch 2010) introduced coverage about superconducting magnetic energy storage systems and superconducting transformers. The 2011 report contains additional information about superconducting power equipment, including progress to demonstrations in some projects. The 2011 report also includes a section on superconductin...

2011-12-22T23:59:59.000Z

469

Power Purchase Agreements  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar.

470

Green Power Network: Green Power Leadership Awards  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards will highlight the accomplishments of green power suppliers (utilities, retail suppliers, REC marketers, and renewable energy project developers) that are innovators and...

471

Table 4. Electric Power Industry Capability by Primary Energy Source, 1990 Throu  

U.S. Energy Information Administration (EIA) Indexed Site

Idaho" Idaho" "Energy Source",1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,"Percentage Share" ,,,,,,,,,,,,,,,,,,,,,,2000,2010 "Electric Utilities",2282,2282,2357,2304,2500,2559,2553,2576,2576,2571,2585,2659,2690,2439,2394,2558,2558,2547,2686,3029,3035,85.7,76.1 " Petroleum",56,56,56,6,6,6,6,6,6,6,6,5,5,5,5,5,5,5,5,5,5,0.2,0.1 " Natural Gas","-","-","-","-",136,136,136,136,136,136,136,212,212,212,212,376,376,376,536,543,543,4.5,13.6 " Hydroelectric",2227,2226,2302,2299,2358,2418,2412,2435,2435,2429,2444,2441,2472,2221,2176,2176,2176,2166,2144,2481,2486,81,62.3 "Independent Power Producers and Combined Heat and Power",314,353,379,404,409,415,434,434,433,433,432,577,574,563,592,602,652,649,692,729,955,14.3,23.9

472

Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.  

DOE Green Energy (OSTI)

On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B; Decision and Information Sciences; Western Area Power Administration

2010-07-31T23:59:59.000Z

473

High power fast ramping power supplies  

Science Conference Proceedings (OSTI)

Hundred megawatt level fast ramping power converters to drive proton and heavy ion machines are under research and development at accelerator facilities in the world. This is a leading edge technology. There are several topologies to achieve this power level. Their advantages and related issues will be discussed.

Marneris,I.; Bajon, E.; Bonati, R.; Sandberg, J.; Roser, T.; Tsoupas, N.

2009-05-04T23:59:59.000Z

474

Active Power Control from Wind Power (Presentation)  

DOE Green Energy (OSTI)

In order to keep the electricity grid stable and the lights on, the power system relies on certain responses from its generating fleet. This presentation evaluates the potential for wind turbines and wind power plants to provide these services and assist the grid during critical times.

Ela, E.; Brooks, D.

2011-04-01T23:59:59.000Z

475

Green Power Network: Green Power Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Green Power Marketing Green Certificates Carbon Offsets State Policies govern_purch Community Choice Aggregation Disclosure Policies Green Power Policies Net Metering Policies Green Power Policies A number of state and local governments have policies in place that encourage the development of green power markets. Government green power purchasing mandates or goals have been established by the federal government, as well as state and local governments to procure renewable energy for the electricity used by government facilities or operations. Community choice aggregation allows communities to determine their electricity generation sources by aggregating the community load and purchasing electricity from an alternate electricity supplier while still receiving transmission and distribution service from their existing provider.

476

ANALYSIS OF THE CALIFORNIA ENERGY INDUSTRY  

E-Print Network (OSTI)

hydroelectric power plant Pumped storage Geothermal power plant Solar power plant Waste-fired power plant Active solar heating Wind turbine generator

Authors, Various

2010-01-01T23:59:59.000Z

477

Data Center Power Consumption  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Center Power Consumption Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kW/rack (1992); 14 kW/rack (2007) Racks are not fully populated due to power/cooling constraints Fact - Increasing processor power Moore's law Fact - Energy cost going up 3 yr. energy cost equivalent to acquisition cost Fact - Iterative power life cycle Takes as much energy to cool computers as it takes to power them. Fact - Over-provisioning Most data centers are over-provisioned with cooling and still have hot spots November 2007 SubZero Engineering An Industry at the Crossroads Conflict between scaling IT demands and energy efficiency Server Efficiency is improving year after year Performance/Watt doubles every 2 years Power Density is Going Up

478

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

resolved Power capture and conversion in line with prediction 11 CF16539GG 1 OCEAN POWER DELIVERY LTD PROJECTS 12 CF16539GG 1 Enersis - Project 1 Enersis Portugal's largest...

479

Power and energy  

Science Conference Proceedings (OSTI)

The design and manufacture of electric power equipment, the one electrotechnology in which Europe could gain worldwide dominance by the end of the century, is examined. All three power-equipment categories-generation, transmission, and distribution-are ...

G. Zorpette

1990-04-01T23:59:59.000Z

480

IBM POWER6 microarchitecture  

Science Conference Proceedings (OSTI)

This paper describes the implementation of the IBM POWER6™ microprocessor, a two-way simultaneous multithreaded (SMT) dual-core chip whose key features include binary compatibility with IBM POWER5™ microprocessor-based systems; increased ...

H. Q. Le; W. J. Starke; J. S. Fields; F. P. O'Connell; D. Q. Nguyen; B. J. Ronchetti; W. M. Sauer; E. M. Schwarz; M. T. Vaden

2007-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric power jf" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Power Management Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

additional savings of 1.3 billion are lost because power management is present, but disabled. In some cases, power management is not compatible with the application or doesn't...

482

Space Solar Power Program  

DOE Green Energy (OSTI)

Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

Arif, H.; Barbosa, H.; Bardet, C.; Baroud, M.; Behar, A.; Berrier, K.; Berthe, P.; Bertrand, R.; Bibyk, I.; Bisson, J.; Bloch, L.; Bobadilla, G.; Bourque, D.; Bush, L.; Carandang, R.; Chiku, T.; Crosby, N.; De Seixas, M.; De Vries, J.; Doll, S.; Dufour, F.; Eckart, P.; Fahey, M.; Fenot, F.; Foeckersperger, S.; Fontaine, J.E.; Fowler, R.; Frey, H.; Fujio, H.; Gasa, J.M.; Gleave, J.; Godoe, J.; Green, I.; Haeberli, R.; Hanada, T.; Ha

1992-08-01T23:59:59.000Z

483

Body powered thermoelectric systems  

E-Print Network (OSTI)

Great interest exists for and progress has be made in the effective utilization of the human body as a possible power supply in hopes of powering such applications as sensors and continuously monitoring medical devices ...

Settaluri, Krishna Tej

2012-01-01T23:59:59.000Z

484

Concentrating Solar Power  

DOE Green Energy (OSTI)

Summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts within its concentrating solar power subprogram.

Not Available

2008-09-01T23:59:59.000Z

485

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

disconnect switches, microprocessor relays, power transformers, surge arresters, and transformer bushings information resources management equipment and supplies such as monitors,...

486

Power Conversion System Architectures  

Science Conference Proceedings (OSTI)

... of Transformers • Vacuum Pressure Impregnated (VPI) • Oil Immersed • Cast Coil Transformer Configurations • Single winding 5/24/2012 Power ...

2012-11-13T23:59:59.000Z

487

Soldier power. Battery charging.  

E-Print Network (OSTI)

Soldier power. Marine. Battery charging. Advertising. Remote. SOFC (NanoDynamics, AMI) 60 watts q SOFC #12;

Hong, Deog Ki

488

Increased Power Flow Guidebook  

Science Conference Proceedings (OSTI)

The Increased Power Flow (IPF) Guidebook is a state-of-the-art and best practices guidebook on increasing power flow capacities of existing overhead transmission lines, underground cables, power transformers, and substation equipment without compromising safety and reliability. The Guidebook discusses power system concerns and limiting conditions to increasing capacity, reviews available technology options and methods, illustrates alternatives with case studies, and analyzes costs and benefits of differe...

2005-11-16T23:59:59.000Z

489

Superconducting Power Cables  

Science Conference Proceedings (OSTI)

Power cables constructed from superconducting materials are being realized in utility demonstrations within the United States. Cooled by liquid nitrogen, high temperature superconducting power cables can transfer large amounts of power through relatively small cross sections. The key to their high power capacity is the high current density inherent with superconductors; a superconducting wire can conduct several times as much current as copper or aluminum conductors of the same cross section. For the pas...

2006-11-30T23:59:59.000Z

490

Electric Power Metrology News  

Science Conference Proceedings (OSTI)

... Next-generation "smart" electrical meters for residential and commercial ... NIST Team Demystifies Utility of Power Factor Correction Devices Release ...

2010-05-24T23:59:59.000Z

491

Wind powering America: Colorado  

DOE Green Energy (OSTI)

This fact sheet contains information about green power programs in Colorado and a description of the Ponnequin Wind Farm.

O'Dell, K.

2000-04-03T23:59:59.000Z

492

Search for fusion power  

SciTech Connect

A brief review of the basics of fusion power is given. Both inertial confinement and magnetic confinement fusion are discussed.

Post, R.F.

1978-10-12T23:59:59.000Z

493

Power Plant Cycling Costs  

Science Conference Proceedings (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

494

Peak power identification on power bumps during test application  

Science Conference Proceedings (OSTI)

Peak power during test can seriously impact circuit performance as well as the power safety for both CUT and tester. In this paper, we propose a method of layout-aware weighted switching activity identification flow that evaluates peak current/power ... Keywords: CMOS device, peak power identification, power bumps, test application, layout-aware weighted switching activity identification flow, dynamic power model, parasitic capacitance, resistance network, power bus, power delivery path, IR-drop, commercial power sign-off analysis tool

Wei Zhao; M. Tehranipoor

2011-07-01T23:59:59.000Z

495

Electronic copy available at: http://ssrn.com/abstract=1768882 rkfsbopfqv=lc=jf`efd^k=  

E-Print Network (OSTI)

in the field or triumph over alternative projects of change" (Guillen, 2006: 43). These actions are often

Edwards, Paul N.

496

J.F.: Challenges in Mapping Graph Exploration Algorithms on Advanced Multi-core Processors  

E-Print Network (OSTI)

Multi-core processors are a shift of paradigm in computer architecture that promises a dramatic increase in performance. But multi-core processors also bring an unprecedented level of complexity in algorithmic design and software development. In this paper we describe the challenges and design choices involved in parallelizing a breadth-first search (BFS) algorithm on a state-of-the-art multi-core processor, the Cell Broadband Engine (Cell BE). Our experiments obtained on a pre-production Cell BE board running at 3.2 GHz show almost linear speedups when using multiple synergistic processing units, and an impressive level of performance when compared to other processors. The Cell BE is typically an order of magnitude faster than conventional processors, such as the AMD Opteron and the Intel Pentium 4 and Woodcrest, an order of magnitude faster than the MTA-2 multi-threaded processor, and two orders of magnitude faster than a BlueGene/L processor. 1

Oreste Villa; Daniele Paolo Scarpazza; Fabrizio Petrini; Juan Fernández Peinador

2007-01-01T23:59:59.000Z

497

Intracellular trafficking of adeno-associated viral and JF Engelhardt1,2,3  

E-Print Network (OSTI)

, Iowa City, IA, USA; 2 Department of Internal Medicine, University of Iowa School of Medicine, Iowa City, IA, USA; and 3 Center for Gene Therapy, University of Iowa School of Medicine, Iowa City, IA, USA following receptor binding and leading to nuclear uptake. These stages are broadly classified

Engelhardt, John F.

498

MATERIALS FORUM VOLUME 29 -Published 2005 262 Edited by J.F. Nie and M. Barnett  

E-Print Network (OSTI)

and cobalt (e.g. `Stellite') may be sprayed, it appears that resistance to wear or oxidation is considered

University of Technology, Sydney

499

Technical Sessions J.-F. Louis Atmospheric and Environment Research, Inc.  

NLE Websites -- All DOE Office Websites (Extended Search)

-F. Louis -F. Louis Atmospheric and Environment Research, Inc. Cambridge, MA 02139 curve fitting and statistical interpolation.lrl fitting techniques, the fields are represented locally by analytical spline functions whose coefficients are determined by a least square method. Somewhat simpler malthematically, and more often used, statistical interpolation defines the value of the field at each grid point as the weighted average of nearby data. The Cressman and the Barnes techniques are two examples of statistical interpolation, which differ mainly by the shape of the weighting ful1ction. Generally, several passes through thedataare performed with different weighting functions, making successive corrections to the field to get as much information as possible out of the data.

500

Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1995 and 1994  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on Alaska`s internal control structure and on compliance with laws and regulations are also provided. The Alaska Power Administration operates and maintains two hydroelectric projects that include five generator units, three power tunnels and penstocks, and over 88 miles of transmission line. Additional information about Alaska Power Administration is provided in the notes to the financial statements. The 1995 financial statement audit was made under the provisions of the Inspector General Act (5 U.S.C. App.), as amended, the Chief Financial Officers (CFO) Act (31 U.S.C. 1500), and Office of Management and Budget implementing guidance to the CFO Act. The auditor`s work was conducted in accordance with generally accepted government auditing standards. To fulfill the audit responsibilities, the authors contracted with the independent public accounting firm of KPMG Peat Marwick (KPMG) to conduct the audit for us, subject to review. The auditor`s report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditor also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

NONE

1995-12-31T23:59:59.000Z