Powered by Deep Web Technologies
Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

SciTech Connect

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

2

Maximizing Gross Margin of a Pumped Storage Hydroelectric Facility Under Uncertainty in Price and Water Inflow.  

E-Print Network (OSTI)

??The operation of a pumped storage hydroelectric facility is subject to uncertainty. This is especially true in todays energy markets. Published models to achieve optimal (more)

Ikudo, Akina

2009-01-01T23:59:59.000Z

3

Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.  

SciTech Connect

This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

Howerton, Jack; Hwang, Diana

1984-11-01T23:59:59.000Z

4

S. 522: A Bill to provide for a limited exemption to the hydroelectric licensing provisions of part I of the Federal Power Act for certain transmission facilities associated with the El Vado Hydroelectric Project in New Mexico. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session  

SciTech Connect

This report discusses a bill that provides for a limited exemption to part I of the Federal Power Act dealing with the hydroelectric licensing provisions for certain transmission facilities associated with the El Vado Hydroelectric project in New Mexico.

NONE

1995-12-31T23:59:59.000Z

5

Limited exemption to hydroelectric licensing provisions for transmission facilities associated with the El Vado Hydroelectric Project. Introduced in the Senate, One Hundred Fourth Congress, First Session, April 27, 1995  

SciTech Connect

The report addresses bill S. 522 which is to provide for a limited exemption to the hydroelectric licensing provisions of part I of the Federal Power Act for certain transmission facilities associated with the El Vado Hydroelectric Project in New Mexico. The bill proposes to permit a limited exemption for a 12 mile transmission line to Rio Arriba County, New Mexico. The project was licensed by the Federal Energy Regulatory Commission. The background and need for the exemption is presented. Statements of government officials are included.

NONE

1995-12-31T23:59:59.000Z

6

upper (hydroelectric) development  

Science Journals Connector (OSTI)

upper (hydroelectric) development, upper (hydroelectric) station, upstream (hydroelectric) development, upstream (hydroelectric) station ? Oberstufe f, oberes Wasserkraftwerk n, Oberliegerkraftwerk

2014-08-01T23:59:59.000Z

7

Hydroelectric Plants (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

A permit is required from the Executive Council of Iowa for the construction, maintenance, or operation of any hydroelectric facility. All applications will be subject to a public hearing.

8

Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map  

Science Journals Connector (OSTI)

In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

Yaoyao He; Shanlin Yang; Qifa Xu

2013-01-01T23:59:59.000Z

9

Improvement of the effectiveness of spillway operation of high-head hydroelectric stations  

SciTech Connect

This article formulates the hydraulics and energetics involved in the aerated two-phase flow of water over and down the spillway of a high-head hydroelectric power plant into the receiving pools and constructs a flow model describing kinetic energy transfer and losses and air bubble compression forces for different configurations and inclinations of the spillway surface for purposes of spillway design.

Khlopenkov, P.R.

1987-10-01T23:59:59.000Z

10

Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2005-2006 Annual Report.  

SciTech Connect

2005 was an average to below average flow year at John Day and Bonneville Dams. A large increase in flow in May improved migration conditions for that peak passage month. Spill was provided April through August and averaged about 30% and 48% of river flow at John Day and Bonneville Dams, respectively. Water temperature graphs were added this year that show slightly lower than average water temperature at John Day and slightly higher than average temperatures at Bonneville. The number of fish handled at John Day decreased from 412,797 in 2004 to 195,293 this year. Of the 195,293 fish, 120,586 (61.7%) were collected for researchers. Last year, 356,237 (86.3%) of the fish sampled were for researchers. This dramatic decline is the result of (1) fewer research fish needed (2) a smaller, lighter tag which allowed for tagging of smaller fish, and (3) a larger average size for subyearling chinook. These factors combined to reduce the average sample rate to 10.8%, about half of last year's rate of 18.5%. Passage timing at John Day was similar to previous years, but the pattern was distinguished by larger than average passage peaks for spring migrants, especially sockeye. The large spike in mid May for sockeye created a very short middle 80% passage duration of just 16 days. Other spring migrants also benefited from the large increase in flow in May. Descaling was lower than last year for all species except subyearling chinook and below the historical average for all species. Conversely, the incidence of about 90% of the other condition factors increased. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, less than 1% for all species. On 6 April a slide gate was left closed at John Day and 718 fish were killed. A gate position indicator light was installed to prevent reoccurrences. Also added this year was a PIT tag detector on the adult return-to-river flume. For the first time this year, we successfully held Pacific lamprey ammocetes. The number of fish sampled at Bonneville Dam was also down this year to 260,742, from 444,580 last year. Reasons for the decline are the same as stated above for John Day. Passage timing at Bonneville Dam was quite similar to previous years with one notable exception, sockeye. Sockeye passage was dominated by two large spikes in late May that greatly condensed the passage pattern, with the middle 80% passing Bonneville in just 18 days. Unlike John Day, passage for the rest of the species was well disbursed from late April through early June. Fish condition was good, with reductions in descaling rates for all species except unclipped steelhead and sockeye. Sockeye mortality matched last year's rate but was considerably lower for all other species. Rare species sampled at Bonneville this year included a bull trout and a eulachon.

Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean (Pacific States Marine Fisheries Commission, The Dalles, OR)

2006-04-01T23:59:59.000Z

11

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency...  

Office of Environmental Management (EM)

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer...

12

Stochastic Co-optimization for Hydro-Electric Power Generation  

E-Print Network (OSTI)

in three hydroelectric power plants and is currently constructing a fourth, earns income from power sales and maintain stable towns close to the river. We both get the benefits of improved hydroelectric power

13

Small Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Jump to: navigation, search TODO: Add description List of Small Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleSmallHydroelectric&ol...

14

The Influence of Tag Presence on the Mortality of Juvenile Chinook Salmon Exposed to Simulated Hydroturbine Passage: Implications for Survival Estimates and Management of Hydroelectric Facilities  

SciTech Connect

Each year, millions of fish have telemetry tags (acoustic, radio, inductive) surgically implanted to assess their passage and survival through hydropower facilities. One route of passage of particular concern is through hydro turbines, in which fish may be exposed to a range of potential injuries, including barotraumas from rapid decompression. The change in pressure from acclimation to exposure (nadir) has been found to be an important factor in predicting the likelihood of mortality and injury for juvenile Chinook salmon undergoing rapid decompression associated with simulated turbine passage. The presence of telemetry tags has also been shown to influence the likelihood of injury and mortality for juvenile Chinook salmon. This research investigated the likelihood of mortality and injury for juvenile Chinook salmon carrying telemetry tags and exposed to a range of simulated turbine passage. Several factors were examined as predictors of mortal injury for fish undergoing rapid decompression, and the ratio of pressure change and tag burden were determined to be the most predictive factors. As the ratio of pressure change and tag burden increase, the likelihood of mortal injury also increases. The results of this study suggest that previous survival estimates of juvenile Chinook salmon passing through hydro turbines may have been biased due to the presence of telemetry tags, and this has direct implications to the management of hydroelectric facilities. Realistic examples indicate how the bias in turbine passage survival estimates could be 20% or higher, depending on the mass of the implanted tags and the ratio of acclimation to exposure pressures. Bias would increase as the tag burden and pressure ratio increase, and have direct implications on survival estimates. It is recommended that future survival studies use the smallest telemetry tags possible to minimize the potential bias that may be associated with carrying the tag.

Carlson, Thomas J.; Brown, Richard S.; Stephenson, John R.; Pflugrath, Brett D.; Colotelo, Alison HA; Gingerich, Andrew J.; Benjamin, Piper L.; Langeslay, Mike; Ahmann, Martin L.; Johnson, Robert L.; Skalski, John R.; Seaburg, Adam; Townsend, Richard L.

2012-05-01T23:59:59.000Z

15

The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities  

SciTech Connect

Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

Colotelo, Alison HA; Pflugrath, Brett D.; Brown, Richard S.; Brauner, Colin J.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiqun; Ahmann, Martin L.; Trumbo, Bradly A.

2012-10-01T23:59:59.000Z

16

Gasification Product Improvement Facility (GPIF). Final report  

SciTech Connect

The gasifier selected for development under this contract is an innovative and patented hybrid technology which combines the best features of both fixed-bed and fluidized-bed types. PyGas{trademark}, meaning Pyrolysis Gasification, is well suited for integration into advanced power cycles such as IGCC. It is also well matched to hot gas clean-up technologies currently in development. Unlike other gasification technologies, PyGas can be designed into both large and small scale systems. It is expected that partial repowering with PyGas could be done at a cost of electricity of only 2.78 cents/kWh, more economical than natural gas repowering. It is extremely unfortunate that Government funding for such a noble cause is becoming reduced to the point where current contracts must be canceled. The Gasification Product Improvement Facility (GPIF) project was initiated to provide a test facility to support early commercialization of advanced fixed-bed coal gasification technology at a cost approaching $1,000 per kilowatt for electric power generation applications. The project was to include an innovative, advanced, air-blown, pressurized, fixed-bed, dry-bottom gasifier and a follow-on hot metal oxide gas desulfurization sub-system. To help defray the cost of testing materials, the facility was to be located at a nearby utility coal fired generating site. The patented PyGas{trademark} technology was selected via a competitive bidding process as the candidate which best fit overall DOE objectives. The paper describes the accomplishments to date.

NONE

1995-09-01T23:59:59.000Z

17

Kingairloch Hydroelectric Scheme  

Science Journals Connector (OSTI)

Worldwide today the installed capacity of hydroelectric power stations is of the order of...9) supplying some 3,000TWh (where T = 1012).

Dr. Reginald W. Herschy

2012-01-01T23:59:59.000Z

18

Repurposing a Hydroelectric Plant.  

E-Print Network (OSTI)

??This thesis project explores repurposing a hydroelectric plant along Richmond Virginia's Canal Walk. The building has been redesigned to create a community-oriented space programmed as (more)

Pritcher, Melissa

2008-01-01T23:59:59.000Z

19

HYDROELECTRIC SYSTEM DESIGN.  

E-Print Network (OSTI)

??Hydroelectric power generation is not a viable option as a prime source of electrical energy for the Pico Blanco Boy Scout Camp, as determined by (more)

Brown, Timothy McDonnell

2010-01-01T23:59:59.000Z

20

Optimizing Profits from Hydroelectricity Production  

E-Print Network (OSTI)

Optimizing Profits from Hydroelectricity Production Daniel De Ladurantaye Michel Gendreau Jean the profits obtained by the stochastic model. Keywords: Hydroelectricity, electricity market, prices, dams countries deregulate their electricity market, new challenges appear for hydroelectricity producers

Potvin, Jean-Yves

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2001-09-01T23:59:59.000Z

22

Small Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Small)) Jump to: navigation, search TODO: Add description List of Small Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleSmallHydroelectric&oldid26...

23

Hydroelectric energy | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric) Jump to: navigation, search TODO: Add description List of Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleHydroelectricenergy&oldid...

24

Improved Saltstone Facilities Restart Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improved Saltstone Facilities Restart Operations Improved Saltstone Facilities Restart Operations Improved Saltstone Facilities Restart Operations September 1, 2012 - 12:00pm Addthis Savannah River Remediation employees install new equipment in the Saltstone Process Room during the recent outage. Savannah River Remediation employees install new equipment in the Saltstone Process Room during the recent outage. AIKEN, S.C. - The Saltstone Facilities at the Savannah River Site (SRS) have restarted operations following a nine-month planned improvement outage. Improvements to the facilities are expected to provide a new and more reliable system to process larger amounts of decontaminated salt solution needed for future tank closure operations. Saltstone processs and disposes of decontaminated salt solution, reducing the risk of potential

25

Hydroelectric energy | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Incentives Retrieved from "http:en.openei.orgwindex.php?titleHydroelectricenergy&oldid277908...

26

Underground pumped hydroelectric storage  

SciTech Connect

Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-leveling requirements of a greater metropolitan area with population of 1 million or more. The technical feasibility of UPHS depends upon excavation of a subterranean powerhouse cavern and reservoir caverns within a competent, impervious rock formation, and upon selection of reliable and efficient turbomachinery - pump-turbines and motor-generators - all remotely operable.

Allen, R.D.; Doherty, T.J.; Kannberg, L.D.

1984-07-01T23:59:59.000Z

27

Scottish Hydroelectric Schemes  

Science Journals Connector (OSTI)

... completed his study of the report into the Enquiry into the Fado-Fionn and Laidon hydroelectric schemes. The report concluded that neither scheme was needed, at least up to 1975 ...

1965-12-18T23:59:59.000Z

28

Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)  

E-Print Network (OSTI)

Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India private hydroelectric facility, located at the Baspa River which is an important left-hand tributary

Bookhagen, Bodo

29

Improved approximation algorithms for a capacitated facility location problem  

E-Print Network (OSTI)

that ordinary randomized rounding rarely generates a feasible solution to the associated set covering problemImproved approximation algorithms for a capacitated facility location problem Fabi'an A. Chudak. There is a set of demand locations that require service from facilities; there is a set of locations at which

Keinan, Alon

30

Hydroelectric | OpenEI  

Open Energy Info (EERE)

Hydroelectric Hydroelectric Dataset Summary Description This dataset presents summary information related to world hydropower. It is part of a supporting dataset for the book World On the Edge: How to Prevent Environmental and Economic Collapse by Lester R. Source Earth Policy Institute Date Released January 12th, 2011 (3 years ago) Date Updated Unknown Keywords Hydro Hydroelectric Data application/vnd.ms-excel icon book_wote_energy_hydro.xls (xls, 83.5 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Attribution License Comment "Reuse of our data is permitted. We merely ask that wherever it is listed, it be appropriately cited" Rate this dataset Usefulness of the metadata

31

Environmental Justice and Federal Facilities: Recommendations for Improving Stakeholder Relations Between Federal Facilities and Enviornmental Justice Communities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J J FEDERAL FACILITIES R IMPROVING S R BETWEEN FEDERAL F E JUSTICE COMMUNITIES October 2004 Prepared by the National Environmental Justice Advisory Council Waste and Facility Siting Subcommittee Federal Facilities Working Group NVIRONMENTAL USTICE AND ECOMMENDATIONS FOR TAKEHOLDER ELATIONS ACILITIES AND NVIRONMENTAL ENVIRONMENTAL JUSTICE AND FEDERAL FACILITIES RECOMMENDATIONS FOR IMPROVING STAKEHOLDER RELATIONS BETWEEN FEDERAL FACILITIES AND ENVIRONMENTAL JUSTICE COMMUNITIES October 2004 Prepared by the National Environmental Justice Advisory Council Waste and Facility Siting Subcommittee Federal Facilities Working Group ACKNOWLEDGMENTS The Federal Facilities Working Group of the National Environmental Justice Advisory Council's (NEJAC) Waste and Facility Siting Subcommittee wishes to acknowledge and thank the organizations and individuals

32

NREL: News Feature - New Test Facility to Improve Wind Turbines  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Facility to Improve Wind Turbines Test Facility to Improve Wind Turbines December 26, 2013 Two men stand in front of the test equipment in the dynamometer facility discussing work being done. Behind them are two large blue machines that make up the dynamometer test apparatus. A white wind turbine nacelle system is attached to these devices to their left. Enlarge image NREL engineer Scott Lambert (left) and Project Manager Mark McDade discuss calibrations being done on the new dynamometer at the 5-MW Dynamometer Test Facility at NREL's National Wind Technology Center (NWTC). Credit: Dennis Schroeder Premature failures of mechanical systems have a significant impact on the cost of wind turbine operations and thus the total cost of wind energy. Recently, the Energy Department's National Renewable Energy Laboratory

33

Chapter 21 - Hydroelectric Power  

Science Journals Connector (OSTI)

Hydroelectric power (hydropower) is a renewable energy source where electrical power is derived from the energy of water moving from higher to lower elevations. It is a proven, mature, predictable and price competitive technology. Hydropower has the best conversion efficiencies among all known energy sources (about 90% efficiency, water to wire). It requires relatively high initial investment, but has a long lifespan with very low operation and maintenance costs. The existing hydropower system has an annual generation capacity of 3500TWha?1 and contributes to 16% of the annual electricity generation worldwide. There is still a large potential for further development, as the total technical potential has been estimated to be roughly 15000TWh. Out of this, about 8000TWh has been classified as economical potential. In Europe close to 50% of technical potential has already been developed, in Asia 25% and in Africa only 8%. Significant potential can also be found in existing infrastructure that currently lacks generating units (e.g. existing barrages, weirs, dams, canal fall structures, water supply schemes) by adding new hydropower facilities. Only 25% of the existing 45000 large dams in the world are currently used for hydropower, the other 75% are used exclusively for other purposes (e.g. irrigation, flood control, navigation and urban water supply schemes). Hydropower offers significant potential for carbon emissions reductions, since greenhouse gas (GHG) emissions are generally very low, typically less than 1% of that from coal power plants. Hydropower is cost competitive, with levelised cost of energy (LCOE) typically in the range (3 to 5) USc(kWh)?1, which is comparable to the cost of energy from thermal power plants. Hydropower has an energy payback ratio (EPR) of 200300, highest of all types of renewable energies. Hydropower can provide both energy and water management services and also help to support other variable renewable energy sources like wind and solar, by providing storage and load balancing services.

nund Killingtveit

2014-01-01T23:59:59.000Z

34

Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Treatment Facility Improves Worker Safety and Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars August 27, 2013 - 12:00pm Addthis The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The new soft-sided overpack is placed for shipment for treatment and repackaging. The new soft-sided overpack is placed for shipment for treatment and repackaging. The box retrieval forklift carriage is used to lift a degraded box as retrieval personnel monitor progress. The new soft-sided overpack is placed for shipment for treatment and repackaging.

35

salt-water pumped-storage hydroelectric plant  

Science Journals Connector (OSTI)

salt-water pumped-storage hydroelectric plant, saltwater pumped-storage hydroelectric station, seawater pumped-storage hydroelectric plant, seawater pumped-storage hydroelectric station ? Salzwasser-...

2014-08-01T23:59:59.000Z

36

AngaraYenisei Hydroelectric Schemes  

Science Journals Connector (OSTI)

... the Rivers Angara and Yenisei will have 'cascades' of six dams, providing power for hydroelectric stations. The largest of these, situated at Bratsk, on the River Angara, was ...

1961-10-14T23:59:59.000Z

37

The northeast Georgia hydroelectric plants.  

E-Print Network (OSTI)

??The Northeast Georgia hydroelectric plants are important cultural resources to the state of Georgia and the communities immediately adjacent. If the early technology of these (more)

Kelly, Nancy Elizabeth

2005-01-01T23:59:59.000Z

38

Environmental Impacts of Increased Hydroelectric Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Environmental Impacts of Increased Hydroelectric Development at Existing Dams Environmental Impacts of Increased Hydroelectric Development at Existing Dams This report describes...

39

Peer Reviewed: Experimenting with Hydroelectric Reservoirs  

Science Journals Connector (OSTI)

Peer Reviewed: Experimenting with Hydroelectric Reservoirs ... Researchers created reservoirs in Canada to explore the impacts of hydroelectric developments on greenhouse gas and methylmercury production. ...

R. A. Bodaly; Kenneth G. Beaty; Len H. Hendzel; Andrew R. Majewski; Michael J. Paterson; Kristofer R. Rolfhus; Alan F. Penn; Vincent L. St. Louis; Britt D. Hall; Cory J. D. Matthews; Katharine A. Cherewyk; Mariah Mailman; James P. Hurley; Sherry L. Schiff; Jason J. Venkiteswaran

2004-09-15T23:59:59.000Z

40

Potential for hydroelectric development in Alaska  

SciTech Connect

Testimony concerning Alaskan hydroelectricity development is presented. Various public and private organizations were represented.

Not Available

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE Office of Indian Energy Foundational Course on Hydroelectric Renewable Energy Text Version  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Webinar Hydroelectric Webinar (text version) Below is the text version of the Webinar titled "DOE Office of Indian Energy Foundational Courses Renewable Energy Technologies: Hydroelectric." Amy Hollander: Hello. I'm Amy Hollander with the National Renewable Energy Laboratory. Welcome to today's webinar on hydroelectricity as a renewable energy, sponsored by the U.S. Department of Energy Office of Indian Energy Policy and Programs. This webinar is being recorded from DOE's National Renewable Energy Laboratory's brand new, state of the art, net zero energy research support facility in Golden, Colorado. Our hydroelectricity presentation today is one of nine foundational webinars in the series from the DOE Office of Indian Energy Education Initiative, designed to assist tribes with

42

Microsoft PowerPoint - AECC Hydroelectric Generation 2010.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Electric Cooperative Corporation Cooperative Corporation AECC H d l i AECC Hydroelectric Generation Facilities Generation Facilities Arkansas Electric Cooperative Corporation Cooperative Corporation * Generation and Transmission Cooperative headquartered in Little Rock * Wholesale power provider for 16 distribution cooperatives * Serves about 62% of Arkansas with over 400,000 consumers O b 2 600 MW f i 12 * Owns about 2,600 MW of generation at 12 different facilities. Arkansas Electric Cooperative Corporation Cooperative Corporation 2009 G i b S f A CC 2009 Generation by Energy Source for AECC Owned and Co-Owned Plants * Natural Gas and Oil 4.0% * Wyoming Coal 88.8% * Water 7.2% Water 7.2% Arkansas Electric Cooperative Corporation Cooperative Corporation E i ti H d l t i Existing Hydroelectric Generating Resources

43

Hydroelectric Conventional | OpenEI  

Open Energy Info (EERE)

Hydroelectric Conventional Hydroelectric Conventional Dataset Summary Description Provides annual consumption (in quadrillion Btu) of renewable energy by energy use sector (residential, commercial, industrial, transportation and electricity) and by energy source (e.g. solar, biofuel) for 2004 through 2008. Original sources for data are cited on spreadsheet. Also available from: www.eia.gov/cneaf/solar.renewables/page/trends/table1_2.xls Source EIA Date Released August 01st, 2010 (4 years ago) Date Updated Unknown Keywords annual energy consumption biodiesel Biofuels biomass energy use by sector ethanol geothermal Hydroelectric Conventional Landfill Gas MSW Biogenic Other Biomass renewable energy Solar Thermal/PV Waste wind Wood and Derived Fuels Data application/vnd.ms-excel icon RE Consumption by Energy Use Sector, Excel file (xls, 32.8 KiB)

44

Conceptual design report -- Gasification Product Improvement Facility (GPIF)  

SciTech Connect

The problems heretofore with coal gasification and IGCC concepts have been their high cost and historical poor performance of fixed-bed gasifiers, particularly on caking coals. The Gasification Product Improvement Facility (GPIF) project is being developed to solve these problems through the development of a novel coal gasification invention which incorporates pyrolysis (carbonization) with gasification (fixed-bed). It employs a pyrolyzer (carbonizer) to avoid sticky coal agglomeration caused in the conventional process of gradually heating coal through the 400 F to 900 F range. In so doing, the coal is rapidly heated sufficiently such that the coal tar exists in gaseous form rather than as a liquid. Gaseous tars are then thermally cracked prior to the completion of the gasification process. During the subsequent endothermic gasification reactions, volatilized alkali can become chemically bound to aluminosilicates in (or added to) the ash. To reduce NH{sub 3} and HCN from fuel born nitrogen, steam injection is minimized, and residual nitrogen compounds are partially chemically reduced in the cracking stage in the upper gasifier region. Assuming testing confirms successful deployment of all these integrated processes, future IGCC applications will be much simplified, require significantly less mechanical components, and will likely achieve the $1,000/kWe commercialized system cost goal of the GPIF project. This report describes the process and its operation, design of the plant and equipment, site requirements, and the cost and schedule. 23 refs., 45 figs., 23 tabs.

Sadowski, R.S.; Skinner, W.H.; House, L.S.; Duck, R.R. [CRS Sirrine Engineers, Inc., Greenville, SC (United States); Lisauskas, R.A.; Dixit, V.J. [Riley Stoker Corp., Worcester, MA (United States); Morgan, M.E.; Johnson, S.A. [PSI Technology Co., Andover, MA (United States). PowerServe Div.; Boni, A.A. [PSI-Environmental Instruments Corp., Andover, MA (United States)

1994-09-01T23:59:59.000Z

45

Modelling the GHG emission from hydroelectric reservoirs  

Science Journals Connector (OSTI)

A mechanistic model has been constructed to compute the fluxes of CO2 and CH4 emitted from the surface of hydroelectric reservoirs. The structure of the model has been designed to be adaptable to hydroelectric re...

Normand Thrien; Ken Morrison

2005-01-01T23:59:59.000Z

46

Optimization Online - Managing Hydroelectric Reservoirs over an ...  

E-Print Network (OSTI)

Jul 7, 2013 ... Managing Hydroelectric Reservoirs over an Extended Planning Horizon using a Benders Decomposition Algorithm Exploiting a Memory Loss...

Pierre-Luc Carpentier

2013-07-07T23:59:59.000Z

47

EIS-0456: Cushman Hydroelectric Project, Tacoma, Washington  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is for the design and construction of certain components of the Cushman Hydroelectric Project in Mason County, Washington.

48

Hydroelectric Reservoirs -the Carbon Dioxide and Methane  

E-Print Network (OSTI)

Hydroelectric Reservoirs - the Carbon Dioxide and Methane Emissions of a "Carbon Free" Energy an overview on the greenhouse gas production of hydroelectric reservoirs. The goals are to point out the main how big the greenhouse gas emissions from hydroelectric reservoirs are compared to thermo-power plants

Fischlin, Andreas

49

British Hydro-Electric Development  

Science Journals Connector (OSTI)

... and availability of skilled labour also enter into the problem. The interconnexion of steam and hydroelectric power plants will, in certain cases, promote the best economic results by utilising the ... England and Wales. They state that the technical difficulties in obtaining efficient results from water turbines operating under the onerous conditions of a widely fluctuating head of water have now been ...

1934-12-29T23:59:59.000Z

50

List of Hydroelectric Incentives | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Incentives Hydroelectric Incentives Jump to: navigation, search The following contains the list of 1298 Hydroelectric Incentives. CSV (rows 1-500) CSV (rows 501-1000) CSV (rows 1001-1298) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active 401 Certification (Vermont) Environmental Regulations Vermont Utility Industrial Biomass/Biogas Coal with CCS Geothermal Electric Hydroelectric energy Small Hydroelectric Nuclear Yes Abatement of Air Pollution: Control of Carbon Dioxide Emissions/Carbon Dioxide Budget Trading Program (Connecticut) Environmental Regulations Connecticut Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government

51

Improving energy efficiency in a pharmaceutical manufacturing environment -- production facility  

E-Print Network (OSTI)

The manufacturing plant of a pharmaceutical company in Singapore had low energy efficiency in both its office buildings and production facilities. Heating, Ventilation and Air-Conditioning (HVAC) system was identified to ...

Zhang, Endong, M. Eng. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

52

Automation of hydroelectric power plants  

SciTech Connect

This paper describes how the author's company has been automating its hydroelectric generating plants. The early automations were achieved with a relay-type supervisory control system, relay logic, dc tachometer, and a pneumatic gate-position controller. While this system allowed the units to be started and stopped from a remote location, they were operated at an output that was preset by the pneumatic control at the generating site. The supervisory control system at the site provided such information as unit status, generator breaker status, and a binary coded decimal (BCD) value of the pond level. The generating units are started by energizing an on-site relay that sets the pneumatic gate controller to a preset value above the synchronous speed of the hydroelectric generator. The pneumatic controller then opens the water-wheel wicket gates to the preset startup position. As the hydroelectric generator starts to turn, the machine-mounted dc tachometer produces a voltage. At a dc voltage equivalent to synchronous speed, the generator main breaker closes, and a contact from the main breaker starts a field-delay timer. Within a few seconds, the field breaker closes. Once the cycle is complete, a relay changes the pneumatic setpoint to a preset operating point of about 8/10 wicket gate opening.

Grasser, H.S. (Consolidated Papers, Inc., Wisconsin Rapids, WI (US))

1990-03-01T23:59:59.000Z

53

Marine Hydroelectric Company | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Company Address: 24040 Camino Del Avion A 107 Place: Monarch Beach Sector: Marine and Hydrokinetic Year Founded: 1983 Phone Number: (949) 361-6474 Website: http:...

54

Hydroelectric Webinar Presentation Slides and Text Version  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides and a text version of the audio from the DOE Office of Indian Energy webinar onhydroelectric renewable energy.

55

The WIPP Hazardous Waste Facility Permit Improvements--2007 Update  

SciTech Connect

The most significant changes to the Waste Isolation Pilot Plant Hazardous Waste Facility Permit to date were completed during the past year with the implementation of significant revisions to the Waste Analysis Plan and the authorization to dispose of remote-handled transuranic waste. The modified Permit removes the requirement for reporting headspace gas sampling and analysis results for every container of transuranic mixed waste and provides for the use of radiography and visual examination to confirm a statistically representative subpopulation of the waste stream in each waste shipment as well as other changes that streamline the analytical data management process. Implementation began on November 17, 2006. (authors)

Kehrman, R.; Most, W. [Washington Regulatory and Environmental Services, Carlsbad, NM (United States)

2007-07-01T23:59:59.000Z

56

Vibrant fault diagnosis for hydroelectric generator units with a new combination of rough sets and support vector machine  

Science Journals Connector (OSTI)

The fault diagnosis for hydroelectric generator unit (HGU) is significant to prevent dangerous accidents from occurring and to improve economic efficiency. The faults of HGU involve overlapping fault patterns which may denote a kind of faults in the ... Keywords: Fault diagnosis, Hydroelectric generator unit, Rough sets, Support vector machine

Xiaoyuan Zhang; Jianzhong Zhou; Jun Guo; Qiang Zou; Zhiwei Huang

2012-02-01T23:59:59.000Z

57

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities  

Energy.gov (U.S. Department of Energy (DOE))

Case study details the Exchange (formerly the Army and Air Force Exchange Service), which took a leadership role in kitchen appliance upgrades to improve water efficiency by integrating water efficiency concepts into the organization's overall sustainability plan and objectives.

58

Facility optimization to improve activation rate distributions during IVNAA  

Science Journals Connector (OSTI)

......2013 research-article Physics This is an Open Access...to improve activation rate distributions during IVNAA...mirihakim@yahoo.com Physics Department, College of...neutrons, the activation rate falls off rapidly with...high-energy neutrons pass through the surface layers......

Atiyeh Ebrahimi Khankook; Laleh Rafat Motavalli; Hashem Miri Hakimabad

2013-05-01T23:59:59.000Z

59

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program This document contains the Final...

60

Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

ORIGINAL PAPER Photomineralization in a boreal hydroelectric reservoir  

E-Print Network (OSTI)

ORIGINAL PAPER Photomineralization in a boreal hydroelectric reservoir: a comparison with natural dioxide Á Dissolved organic matter Á Boreal hydroelectric reservoir Á Greenhouse gas production

Long, Bernard

62

Hydro-Electric Development Works1  

Science Journals Connector (OSTI)

... Institution of Electrical Engineers by Mr. J. W. Meares, chief engineer of the Hydroelectric Service of India, dealing with the general principles of the development and storage of ... 's paper is a general survey of the various problems connected with the inception of hydroelectric installations; it outlines the conditions essential to the satisfactory development of any scheme of ...

BRYSSON CUNNINGHAM

1919-10-23T23:59:59.000Z

63

Hungarian establishment now opposes hydroelectric project  

Science Journals Connector (OSTI)

... permission to publish its three reports on the probable environmental effect of the Gabcikovo-Nagymaros hydroelectric project. This is the latest in a sequence of events that, since the conference ... , north from its present channel, and the construction of two major 'peak-hour' hydroelectric plants at Gabcikovo in Slovakia and Nagymaros in Hungary, was originally intended as a ...

Vera Rich

1988-08-25T23:59:59.000Z

64

Energy 101: Hydroelectric Power | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy 101: Hydroelectric Power Energy 101: Hydroelectric Power Energy 101: Hydroelectric Power August 13, 2013 - 2:27pm Addthis Learn how hydroelectric power, or hydropower, captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. Humans have been using water to generate power for thousands of years. Hydroelectric power, or hydropower, captures the kinetic energy of flowing water and turns it into electricity, which is then fed into the electrical grid to be used in homes and businesses. This edition of Energy 101 shows how the Energy Department is supporting the development of new hydropower technologies to produce clean, renewable, and reliable power here in the United States. For more information on hydropower from the Office of Energy Efficiency and

65

Finding of No Significant Impact Improvements at the Thomas Jefferson National Accelerator Facility Newsport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IMPROVEMENTS AT THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY IMPROVEMENTS AT THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY NEWPORT NEWS, VIRGINIA AGENCY: U.S. DEPARTMENT OF ENERGY ACTION: FINDING OF NO SIGNIFICANT IMPACT SUMMARY: The U.S. Department of Energy (DOE) has completed an Environmental Assessment (DOE/EA-1384) for proposed Improvements at the Thomas Jefferson National Accelerator Facility (Jefferson Lab). Newport News, Virginia. Based on the results of the impacts analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No

66

Fish and hydroelectricity; Engineering a better coexistence  

SciTech Connect

This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions.

Zorpette, G.

1990-12-01T23:59:59.000Z

67

Pumped storage for hydroelectric power. (Latest citations from Fluidex (Fluid Engineering Abstracts) database). Published Search  

SciTech Connect

The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 198 citations and includes a subject term index and title list.)

Not Available

1993-10-01T23:59:59.000Z

68

Pumped storage for hydroelectric power. (Latest citations from Fluidex data base). Published Search  

SciTech Connect

The bibliography contains citations concerning the design, development, construction, and characteristics of surface and underground pumped storage for hydroelectric power. Pumped storage projects and facilities worldwide are referenced. There is some consideration of research and experimental results of pumped storage studies, as well as modeling. (Contains a minimum of 192 citations and includes a subject term index and title list.)

Not Available

1992-09-01T23:59:59.000Z

69

Tribal Renewable Energy Foundational Course: Hydroelectric  

Energy.gov (U.S. Department of Energy (DOE))

Watch the U.S. Department of Energy Office of Indian Energy foundational course webinar on hydroelectric renewable energy by clicking on the .swf link below. You can also download the PowerPoint...

70

Hydroelectric Resources on State Lands (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This chapter authorizes the leasing of state lands for the development of hydroelectric resources. It provides regulations for the granting and duration of leases, as well as for the inspection of...

71

Performance and improvements of the tritium handling facility at the Los Alamos Scientific Laboratory  

SciTech Connect

A major problem facing todays nuclear energy industry is the release of radioactive waste products to the atmosphere. The DP-East Tritium Handling Facility at the Los Alamos Scientific Laboratory (LASL), activated December 5, 1974 has processed 3.8 x 10/sup 6/ curies of tritium with a total stack release of 704.5 curies as of December 12, 1979. This averages only 11.7 Ci/month which to our knowledge is the lowest stack release any major tritium facility has achieved. The facility includes an 11.5 m/sup 3/ dry box with associated gas purification system (GPS) and an effluent treatment system (FTS). The system performance, problems, and improvements are discussed with special emphasis given to the ETS, the new dry box waste disposal system, and the new automated logic control system, all of which contribute significantly to the low level tritium release at this facility.

Nasise, J.E.

1980-01-01T23:59:59.000Z

72

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

73

Indian River Hydroelectric Project Grant  

SciTech Connect

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

74

E-Print Network 3.0 - assessment uri hydroelectric Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

uri hydroelectric Search Powered by Explorit Topic List Advanced Search Sample search results for: assessment uri hydroelectric Page: << < 1 2 3 4 5 > >> 1 FUTURE HYDROELECTRIC...

75

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

76

ELIGIBILITY THIRD EDITION  

E-Print Network (OSTI)

........................................................................................................ 11 3. Hydroelectric Facilities

77

List of Small Hydroelectric Incentives | Open Energy Information  

Open Energy Info (EERE)

Hydroelectric Incentives Hydroelectric Incentives Jump to: navigation, search The following contains the list of 1253 Small Hydroelectric Incentives. CSV (rows 1-500) CSV (rows 501-1000) CSV (rows 1001-1253) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active 401 Certification (Vermont) Environmental Regulations Vermont Utility Industrial Biomass/Biogas Coal with CCS Geothermal Electric Hydroelectric energy Small Hydroelectric Nuclear Yes APS - Renewable Energy Incentive Program (Arizona) Utility Rebate Program Arizona Commercial Residential Anaerobic Digestion Biomass Daylighting Geothermal Electric Ground Source Heat Pumps Landfill Gas Other Distributed Generation Technologies Photovoltaics Small Hydroelectric Solar Pool Heating Solar Space Heat Solar Thermal Process Heat

78

Case Study- The Challenge: Improving the Performance of a Waste-To-Energy Facility  

Energy.gov (U.S. Department of Energy (DOE))

This case study examines how the City of Long Beach, California, was able to improve the operational efficiency of its Southeast Resource Recovery Facility (SERRF), a recycling and solid waste-to-energy plant. To replace inlet damper control and reduce energy consumption, variable frequency drives (VFDs) were installed on the induced draft fans of three boiler systems. As a result of the retrofit, facility energy consumption was reduced by more than 34 percent (3,661,200 kWh per year), and the facility saved more than $329,500 annually. Taking into consideration a $400,000 California Energy Commission grant, the simple net payback for this project was just under 10 months.

79

National Ignition Facility subsystem design requirements NIF site improvements SSDR 1.2.1  

SciTech Connect

This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services.

Kempel, P.; Hands, J.

1996-08-19T23:59:59.000Z

80

Definition: Hydroelectric power | Open Energy Information  

Open Energy Info (EERE)

power power Jump to: navigation, search Dictionary.png Hydroelectric power The use of flowing water to power a turbine to produce electrical energy.[1] View on Wikipedia Wikipedia Definition Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. It is the most widely used form of renewable energy, accounting for 16 percent of global electricity generation - 3,427 terawatt-hours of electricity production in 2010, and is expected to increase about 3.1% each year for the next 25 years. Hydropower is produced in 150 countries, with the Asia-Pacific region generating 32 percent of global hydropower in 2010. China is the largest hydroelectricity producer, with 721 terawatt-hours of production in 2010,

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric | Open  

Open Energy Info (EERE)

Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Jump to: navigation, search Tool Summary Name: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Agency/Company /Organization: United States Agency for International Development Sector: Energy Resource Type: Training materials Website: www.energytoolbox.org/gcre/mod_4/index.shtml Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric Screenshot References: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric[1] Logo: Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric GCREhydro.JPG References ↑ "Grid-Connected Renewable Energy Generation Toolkit-Hydroelectric" Retrieved from "http://en.openei.org/w/index.php?title=Grid-Connected_Renewable_Energy_Generation_Toolkit-Hydroelectric&oldid=375082

82

ORIGINAL ARTICLE Ecosystem services and hydroelectricity in Central America  

E-Print Network (OSTI)

ORIGINAL ARTICLE Ecosystem services and hydroelectricity in Central America: modelling service services provided to the Costa Rican and Nicaraguan hydroelectric sectors, which are crucial sectors for the conservation and restoration of forests for the services they provide to the hydroelectric sector. As such

Paris-Sud XI, Université de

83

Hybrid Modeling and Control of a Hydroelectric Power Plant  

E-Print Network (OSTI)

Hybrid Modeling and Control of a Hydroelectric Power Plant Giancarlo Ferrari-Trecate, Domenico,mignone,castagnoli,morari}@aut.ee.ethz.ch Abstract In this work we present the model of a hydroelectric power plant in the framework of Mixed Logic with a model predictive control scheme. 1 Introduction The outflow control for hydroelectric power plants

Ferrari-Trecate, Giancarlo

84

Canadian Hydro-Electric Power Development  

Science Journals Connector (OSTI)

... to investigate more widely, though admittedly in a superficial manner, the present stage of hydroelectric power development in the province of Quebec, where he visited power-sites and waterfalls ... Out of the impressive total, whatever it may be, so far the actual utiHsable turbine installations established at the present time yield only 4| million h.p.-a very ...

BRYSSON CUNNINGHAM

1927-08-27T23:59:59.000Z

85

Market Offering Strategies for Hydroelectric Generators  

Science Journals Connector (OSTI)

This paper considers the problem of offering electricity produced by a series of hydroelectric reservoirs to a pool-type central market. The market model is a simplified version of the New Zealand wholesale electricity market, with prices modelled by ... Keywords: Dynamic programming: finite state, markov, Natural resources: energy, water resources, Probability: markov processes

G. Pritchard; G. Zakeri

2003-07-01T23:59:59.000Z

86

Teamwork Plus Technology Equals Reduced Emissions, Reduced Energy Usage, and Improved Productivity for an Oil Production Facility  

E-Print Network (OSTI)

Teamwork plus Technology Equals Reduced Emissions, Reduced Energy Usage, and Improved Productivity for an Oil Production Facility Garth Booker P Eng Extraction Energy Engineer Suncor Energy Company Fort McMurray, Alberta, Canada ABSTRACT...Teamwork plus Technology Equals Reduced Emissions, Reduced Energy Usage, and Improved Productivity for an Oil Production Facility Garth Booker P Eng Extraction Energy Engineer Suncor Energy Company Fort McMurray, Alberta, Canada ABSTRACT...

Booker, G.; Robinson, J.

87

Accuracy improved with analysis of pulsation effects at gas-pipeline metering facilities  

SciTech Connect

Results of recent research have provided means for diagnosing and controlling systems effects - pulsations and other adverse flow conditions at natural-gas metering sites. In recent years both in the U.S. and in the European Economic Community, several programs have been concerned with improving orifice coefficient data. Programs sponsored by the Gas Research Institute (GRI), the American Petroleum Institute (API), and the American Gas Association (AGA) at the National Bureau of Standards (NBS) facilities at Gaithersburg, MD., and Boulder, Colo., and at the Colorado Engineering Experiment Station are notable examples of this work. Parallel test work in the U.K. at British Gas and National Engineering Labs, at Gasunie in The Netherlands; and at Gaz de France have included round-robin comparison testing of a few standardized orifice sizes. In all cases, the primary objective has been substantially to extend the orifice data base, to reduce data scatter, and to define the seriousness of ''facility bias'' effects which appear to be inherent in the various individual test facilities.

Sparks, C.R.; McKee, R.J.

1986-12-08T23:59:59.000Z

88

Lessons Learned: Pangue Hydroelectric | Open Energy Information  

Open Energy Info (EERE)

Lessons Learned: Pangue Hydroelectric Lessons Learned: Pangue Hydroelectric Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Lessons Learned: Pangue Hydroelectric Agency/Company /Organization: International Finance Corporation Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Background analysis Resource Type: Lessons learned/best practices Website: www.ifc.org/ifcext/sustainability.nsf/AttachmentsByTitle/p_pangue_summ Country: Chile UN Region: Latin America and the Caribbean Coordinates: -35.675147°, -71.542969° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-35.675147,"lon":-71.542969,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

89

Performance Improvements to the Neutron Imaging System at the National Ignition Facility  

SciTech Connect

A team headed by LANL and including many members from LLNL and NSTec LO and NSTec LAO fielded a neutron imaging system (NIS) at the National Ignition Facility at the start of 2011. The NIS consists of a pinhole array that is located 32.5 cm from the source and that creates an image of the source in a segmented scintillator 28 m from the source. The scintillator is viewed by two gated, optical imaging systems: one that is fiber coupled, and one that is lens coupled. While there are a number of other pieces to the system related to pinhole alignment, collimation, shielding and data acquisition, those pieces are discussed elsewhere and are not relevant here. The system is operational and has successfully obtained data on more that ten imaging shots. This remainder of this whitepaper is divided in five main sections. In Section II, we identify three critical areas of improvement that we believe should be pursued to improve the performance of the system for future experiments: spatial resolution, temporal response and signal-to-noise ratio. In Section III, we discuss technologies that could be used to improve these critical performance areas. In Section IV, we describe a path to evolve the current system to achieve improved performance with minimal impact on the ability of the system to operate on shots. In Section V, we discuss the abilities, scope and timescales of the current teams and the Commissariat energie atomique (CEA). In Section VI, we summarize and make specific recommendations for collaboration on improvements to the NIS.

Fittinghoff, D N; Bower, D E; Drury, O B; Dzenitis, J M; Hatarik, R; Merrill, F E; Grim, G P; Wilde, C H; Wilson, D C; Landoas, O; Caillaud, T; Bourgade, J; Buckles, R A; Lee, J; Weiss, P B

2011-09-26T23:59:59.000Z

90

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

This document contains the Final Guidance for the EPAct 2005 Section 242 Hydroelectric Incentive Program. Applications are due February 20, 2015.

91

Lost films chronicle dawn of hydroelectric power in the Northwest  

NLE Websites -- All DOE Office Websites (Extended Search)

Lost-films-chronicle-dawn-of-hydroelectric-power-in-the-Northwest Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

92

Electromagnetic Analysis of Rotating Permanent Magnet Exciters for Hydroelectric Generators.  

E-Print Network (OSTI)

??The purpose of this project is to analyse different design possibilities for a rotating permanent magnet exciter for a hydroelectric generator. This is done through (more)

Nland, Jonas

2013-01-01T23:59:59.000Z

93

Asia Power Leibo Hydroelectricity Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Sichuan Province, China Sector: Hydro Product: China-based developer and operator of small hydro plants. References: Asia Power (Leibo) Hydroelectricity Co Ltd1 This article...

94

The hydroelectric problem of porous rocks: thermodynamic approach and introduction of a percolation threshold  

Science Journals Connector (OSTI)

......research-article Research Notes The hydroelectric problem of porous rocks: thermodynamic...layer. In this note, I take the hydroelectric problem back to its thermodynamic roots by showing how the hydroelectric equations can be derived from the......

Andr Revil

2002-12-01T23:59:59.000Z

95

GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian Aquatic Ecosystems  

E-Print Network (OSTI)

GRADUATE RESEARCH OPPORTUNITIES IN APPLIED SCIENCE Effects of Hydroelectric Operations in Canadian with Fisheries and Oceans Canada (6 scientists) and 3 major hydroelectric companies (Nalcor, Manitoba Hydro

Cooke, Steven J.

96

Forced response analysis of hydroelectric systems  

Science Journals Connector (OSTI)

At off-design operating points, Francis turbines develop cavitation vortex rope in the draft tube which may interact with the hydraulic system. Risk resonance assessment by means of eigenmodes computation of the system is usually performed. However, the system response to the excitation source induced by the cavitation vortex rope is not predicted in terms of amplitudes and phase. Only eigenmodes shapes with related frequencies and dampings can be predicted. Besides this modal analysis, the risk resonance assessment can be completed by a forced response analysis. This method allows identifying the contribution of each eigenmode into the system response which depends on the system boundary conditions and the excitation source location. In this paper, a forced response analysis of a Francis turbine hydroelectric power plant including hydraulic system, rotating train, electrical system and control devices is performed. First, the general methodology of the forced response analysis is presented and validated with time domain simulations. Then, analysis of electrical, hydraulic and hydroelectric systems are performed and compared to analyse the influence of control structures on pressure fluctuations induced by cavitation vortex rope.

S Allign; P C O Silva; A Bguin; B Kawkabani; P Allenbach; C Nicolet; F Avellan

2014-01-01T23:59:59.000Z

97

Joint Base Lewis-McChord Innovations in Facility Energy Improvements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Base Lewis-McChord Joint Base Lewis-McChord (JBLM) Innovations in Facility Energy Improvements Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy-Efficiency at JBLM: An Innovative Partnership A BPA panel discussion featuring:  Brad Miller  Tim Steele  Todd Amundson FUPWG 2011 Spring Meeting April 20, 2011 Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Where is JBLM Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Where is JBLM Slide 5 B O N N E V I L L E P O W E R A D M I N I S T

98

Efficiency analysis of hydroelectric generating plants: A case study for Portugal  

Science Journals Connector (OSTI)

This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 20012004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of best practices. As the frontier is shifting along the time, constant efforts are needed in this respect along the time.

Carlos Pestana Barros

2008-01-01T23:59:59.000Z

99

A Measurement Management Technology for Improving Energy Efficiency in Data Centers and Telecommunication Facilities  

SciTech Connect

Data center (DC) electricity use is increasing at an annual rate of over 20% and presents a concern for the Information Technology (IT) industry, governments, and the society. A large fraction of the energy use is consumed by the compressor cooling to maintain the recommended operating conditions for IT equipment. The most common way to improve the DC efficiency is achieved by optimally provisioning the cooling power to match the global heat dissipation in the DC. However, at a more granular level, the large range of heat densities of today's IT equipment makes the task of provisioning cooling power optimized to the level of individual computer room air conditioning (CRAC) units much more challenging. Distributed sensing within a DC enables the development of new strategies to improve energy efficiency, such as hot spot elimination through targeted cooling, matching power consumption at rack level with workload schedule, and minimizing power losses. The scope of Measurement and Management Technologies (MMT) is to develop a software tool and the underlying sensing technology to provide critical decision support and control for DC and telecommunication facilities (TF) operations. A key aspect of MMT technology is integration of modeling tools to understand how changes in one operational parameter affect the overall DC response. It is demonstrated that reduced ordered models for DC can generate, in less than 2 seconds computational time, a three dimensional thermal model in a 50 kft{sup 2} DC. This rapid modeling enables real time visualization of the DC conditions and enables 'what if' scenarios simulations to characterize response to 'disturbances'. One such example is thermal zone modeling that matches the cooling power to the heat generated at a local level by identifying DC zones cooled by a specific CRAC. Turning off a CRAC unit can be simulated to understand how the other CRAC utilization changes and how server temperature responds. Several new sensing technologies were added to the existing MMT platform: (1) air contamination (corrosion) sensors, (2) power monitoring, and (3) a wireless environmental sensing network. All three technologies are built on cost effective sensing solutions that increase the density of sensing points and enable high resolution mapping of DCs. The wireless sensing solution enables Air Conditioning Unit (ACU) control while the corrosion sensor enables air side economization and can quantify the risk of IT equipment failure due to air contamination. Validation data for six test sites demonstrate that leveraging MMT energy efficiency solutions combined with industry best practices results in an average of 20% reduction in cooling energy, without major infrastructure upgrades. As an illustration of the unique MMT capabilities, a data center infrastructure efficiency (DCIE) of 87% (industry best operation) was achieved. The technology is commercialized through IBM System and Technology Lab Services that offers MMT as a solution to improve DC energy efficiency. Estimation indicates that deploying MMT in existing DCs can results in an 8 billion kWh savings and projection indicates that constant adoption of MMT can results in obtainable savings of 44 billion kWh in 2035. Negotiations are under way with business partners to commercialize/license the ACU control technology and the new sensor solutions (corrosion and power sensing) to enable third party vendors and developers to leverage the energy efficiency solutions.

Hendrik Hamann, Levente Klein

2012-06-28T23:59:59.000Z

100

Improving operational efficiency of fuel oil facilities used at gas-and-oil-fired power stations  

Science Journals Connector (OSTI)

Results obtained from experimental investigations of energy consumption are described, and ways for considerably reducing it are proposed taking as an example the fuel oil facility at the 2400-MW Lukoml District ...

A. K. Vnukov; F. A. Rozanova; A. A. Bazylenko; V. L. Zhurbilo

2009-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Unusual Condition Mining for Risk Management of Hydroelectric Power Plants  

Science Journals Connector (OSTI)

Kyushu Electric Power Co.,Inc. collects different sensor data and weather information to maintain the safety of hydroelectric power plants while the plants are running. In this paper, we consider that the abnormal condition sign may be unusual condition. ...

Takashi Onoda; Norihiko Ito; Hironobu Yamasaki

2006-12-01T23:59:59.000Z

102

Health and environmental impacts of the hydroelectric fuel cycle  

Science Journals Connector (OSTI)

The impacts on health and the environment and the associated damage costs caused by the hydroelectric fuel cycle are assessed in this paper. To this purpose, a large hydroelectric project along the Nestos river in northern Greece has been selected as an example. A large number of impacts have been identified. Occupational accidents, impacts on agriculture and forests, noise produced during the operation of the plant, impacts on biodiversity due to the physical presence of the dams, and alterations to the local water balance are the most important of them. The results of the analysis show that the major contributors to the damage cost of the hydroelectric fuel cycle are impacts on biodiversity and fatal occupational accidents, especially those that occur during the construction phase of the project. Nonetheless hydroelectricity is an environmentally-friendly energy source that exhibits lower damage values compared to other electricity generating technologies.

I.G. Kollas; S. Mirasgedis

2002-01-01T23:59:59.000Z

103

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project  

SciTech Connect

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: ?¢???¢ Increasing safety at Boulder Canyon Hydro ?¢???¢ Increasing protection of the Boulder Creek environment ?¢???¢ Modernizing and integrating control equipment into Boulder?¢????s municipal water supply system, and ?¢???¢ Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to

Joe Taddeucci, P E

2013-03-29T23:59:59.000Z

104

DOE/EIS-0456 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON (FERC PROJECT NO. 460) FINAL ENVIRONMENTAL IMPACT STATEMENT (FERC/EIS-0095F, ADOPTED AS DOE/EIS-0456) US Department of Energy OCTOBER 2010 Lead Agency: U.S. Department of Energy (DOE) Title: Final Environmental Impact Statement (FEIS) for the Cushman Hydroelectric Project, Mason County, Washington (Adopted) Contact: For additional copies or more information on this final environmental impact statement (EIS), please

105

Cost assessment of efficiency losses in hydroelectric plants  

Science Journals Connector (OSTI)

Some important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market.

J.C. Galvis; A. Padilha-Feltrin; J.M. Yusta Loyo

2011-01-01T23:59:59.000Z

106

New Prototype Safeguards Technology Offers Improved Confidence and Automation for Uranium Enrichment Facilities  

SciTech Connect

An important requirement for the international safeguards community is the ability to determine the enrichment level of uranium in gas centrifuge enrichment plants and nuclear fuel fabrication facilities. This is essential to ensure that countries with nuclear nonproliferation commitments, such as States Party to the Nuclear Nonproliferation Treaty, are adhering to their obligations. However, current technologies to verify the uranium enrichment level in gas centrifuge enrichment plants or nuclear fuel fabrication facilities are technically challenging and resource-intensive. NNSAs Office of Nonproliferation and International Security (NIS) supports the development, testing, and evaluation of future systems that will strengthen and sustain U.S. safeguards and security capabilitiesin this case, by automating the monitoring of uranium enrichment in the entire inventory of a fuel fabrication facility. One such system is HEVAhybrid enrichment verification array. This prototype was developed to provide an automated, nondestructive assay verification technology for uranium hexafluoride (UF6) cylinders at enrichment plants.

Brim, Cornelia P.

2013-03-04T23:59:59.000Z

107

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

SciTech Connect

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

108

The hydroelectric problem of porous rocks: inversion of the position of the water table from self-potential data  

Science Journals Connector (OSTI)

......Potential Field and Applied Geophysics The hydroelectric problem of porous rocks: inversion...Green's functions for the coupled hydroelectric problem yields an integral equation...water flow through the electrokinetic (hydroelectric) coupling (e.g. Jouniaux et al......

A. Revil; V. Naudet; J. D. Meunier

2004-11-01T23:59:59.000Z

109

A study of the Mighty Motors operating system : making sustainable improvements at a powertrain manufacturing facility  

E-Print Network (OSTI)

Many manufacturing companies are developing their own production or operating system, particularly in an effort to duplicate the widely renowned Toyota Production System. Toyota has demonstrated its potential for improving ...

Dibb, Gregory David, 1974-

2004-01-01T23:59:59.000Z

110

Bangor Hydro-Electric Co | Open Energy Information  

Open Energy Info (EERE)

Bangor Hydro-Electric Co Bangor Hydro-Electric Co Jump to: navigation, search Name Bangor Hydro-Electric Co Place Maine Service Territory Maine Website www.bhe.com/ Green Button Landing Page secure.bhe.com/webPortal/ Green Button Reference Page www.bhe.com/about-us/news Green Button Implemented Yes Utility Id 1179 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 9 (General Service Rate) Commercial Commercial space heating- Single meter Commercial

111

Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS  

SciTech Connect

This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

Hodge, B.-M.; Lew, D.; Milligan, M.

2011-07-01T23:59:59.000Z

112

Rent sharing in the Clean Development Mechanism The Case of the Tahumanu Hydroelectric Project in Bolivia  

E-Print Network (OSTI)

Rent sharing in the Clean Development Mechanism The Case of the Tahumanu Hydroelectric Project a hydroelectric power plant instead of subsidized diesel plants in the Bolivian Pando Province. Simulations show

Paris-Sud XI, Université de

113

Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint  

SciTech Connect

This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-10-01T23:59:59.000Z

114

DOE Office of Indian Energy Foundational Course: Hydroelectric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydroelectric Hydroelectric Presented by the National Renewable Energy Laboratory Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Course Introduction  Resource Map & Project Scales  Technology Overview: - Siting - Costs  Successful Project Examples  Policies Relevant to Project Development  Additional Information & Resources Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in

115

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

116

Federal Register Notice EPAct 2005 Section 242 Hydroelectric Incentive Program: January 2015  

Energy.gov (U.S. Department of Energy (DOE))

Federal Register Notice for the EPAct 2005 Section 242 Hydroelectric Incentive Program application period announcement: January, 2015.

117

Once more concerning the matter of energy-storage hydroelectric stations  

Science Journals Connector (OSTI)

The energy-storage hydroelectric stations proposed by P. P. Khlopenkov can be regarded as an alternative to...

G. L. Sarukhanov

1993-01-01T23:59:59.000Z

118

RECENT PROCESS AND EQUIPMENT IMPROVEMENTS TO INCREASE HIGH LEVEL WASTE THROUGHPUT AT THE DEFENSE WASTE PROCESSING FACILITY  

SciTech Connect

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) began stabilizing high level waste (HLW) in a glass matrix in 1996. Over the past few years, there have been several process and equipment improvements at the DWPF to increase the rate at which the high level waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process to upsets, thereby minimizing downtime and increasing production. Improvements due to optimization of waste throughput with increased HLW loading of the glass resulted in a 6% waste throughput increase based upon operational efficiencies. Improvements in canister production include the pour spout heated bellows liner (5%), glass surge (siphon) protection software (2%), melter feed pump software logic change to prevent spurious interlocks of the feed pump with subsequent dilution of feed stock (2%) and optimization of the steam atomized scrubber (SAS) operation to minimize downtime (3%) for a total increase in canister production of 12%. A number of process recovery efforts have allowed continued operation. These include the off gas system pluggage and restoration, slurry mix evaporator (SME) tank repair and replacement, remote cleaning of melter top head center nozzle, remote melter internal inspection, SAS pump J-Tube recovery, inadvertent pour scenario resolutions, dome heater transformer bus bar cooling water leak repair and new Infra-red camera for determination of glass height in the canister are discussed.

Odriscoll, R; Allan Barnes, A; Jim Coleman, J; Timothy Glover, T; Robert Hopkins, R; Dan Iverson, D; Jeff Leita, J

2008-01-15T23:59:59.000Z

119

Hydroelectric Voltage Generation Based on Water-Filled Single-Walled Carbon Nanotubes  

Science Journals Connector (OSTI)

Hydroelectric Voltage Generation Based on Water-Filled Single-Walled Carbon Nanotubes ... The hydroelectric voltage generator can be expressed by the model illustrated in Figure 6a and b. ... Individual water-filled single-walled carbon nanotubes as hydroelectric power converters ...

Quanzi Yuan; Ya-Pu Zhao

2009-04-21T23:59:59.000Z

120

Search for non-Newtonian gravitationa gravimetric experiment in a hydroelectric lake  

Science Journals Connector (OSTI)

......gravitation-a gravimetric experiment in a hydroelectric lake G. Muller 1 W. Zurn 2 K. Lindner...gravitation-a gravimetric experiment in a hydroelectric lake G. Muller', W. Zurn2, K...are moved in dry rocks, locks and hydroelectric lakes, they often have a well-defined......

G. Mller; W. Zrn; K. Lindner; N. Rsch

1990-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

PUBLISHED ONLINE: 31 JULY 2011 | DOI: 10.1038/NGEO1211 Carbon emission from hydroelectric reservoirs  

E-Print Network (OSTI)

LETTERS PUBLISHED ONLINE: 31 JULY 2011 | DOI: 10.1038/NGEO1211 Carbon emission from hydroelectric * Hydroelectric reservoirs cover an area of 3.4 ? 105 km2 and comprise about 20% of all reservoirs. In addition dioxide and methane from hydroelectric reservoirs, on the basis of data from 85 globally distributed

122

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION  

E-Print Network (OSTI)

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION JACK E. BAILEY' AND DALE R. EVANS' ABSTRACT A proposed hydroelectric installation in southeastern hydroelectric installation could result in temperatures as low as 4.5 0 C during spawning and initial incubation

123

RETURN TO THE RIVER -2000 Chapter 6 Hydroelectric System Development187  

E-Print Network (OSTI)

RETURN TO THE RIVER - 2000 Chapter 6 Hydroelectric System Development187 Return to Table of Contents Go to Next Chapter CHAPTER 6. HYDROELECTRIC SYSTEM DEVELOPMENT: EFFECTS ON JUVENILE AND ADULT of the Hydroelectric System Development of the hydropower system in the Columbia River basin began in the late

124

FUTURE HYDROELECTRIC DEVELOPMENT SECTION 12 FISH AND WILDLIFE PROGRAM 12-1 September 13, 1995  

E-Print Network (OSTI)

FUTURE HYDROELECTRIC DEVELOPMENT SECTION 12 FISH AND WILDLIFE PROGRAM 12-1 September 13, 1995 Section 12 FUTURE HYDROELECTRIC DEVELOPMENT Much of this program has focused on mitigating damage done for additional federal hydroelectric projects and to plan for new development in the basin. The Federal Energy

125

The net carbon footprint of a newly created boreal hydroelectric reservoir  

E-Print Network (OSTI)

The net carbon footprint of a newly created boreal hydroelectric reservoir Cristian R. Teodoru,1 of a boreal hydroelectric reservoir (Eastmain-1 in northern Québec, Canada). This is the result of a large. Citation: Teodoru, C. R., et al. (2012), The net carbon footprint of a newly created boreal hydroelectric

Long, Bernard

126

Medial design of blades for hydroelectric turbines and ship propellers M. Rossgatterera  

E-Print Network (OSTI)

Medial design of blades for hydroelectric turbines and ship propellers M. Rossgatterera , B. J Abstract We present a method for constructing blades of hydroelectric turbines and ship propellers based. Keywords: CAD-model, B-spline representation, hydroelectric turbine blade, propeller blade, medial axis

Jüttler, Bert

127

The Impacts of Wind Speed Trends and Long-term Variability in Relation to Hydroelectric  

E-Print Network (OSTI)

The Impacts of Wind Speed Trends and Long- term Variability in Relation to Hydroelectric Reservoir and Long-term Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific through diversification. In hydroelectric dominated systems, like the PNW, the benefits of wind power can

Kohfeld, Karen

128

Primal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including a  

E-Print Network (OSTI)

Primal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including that minimizes losses in the transmission and costs in the generation of a hydroelectric power system, formulated such perturbing parameter. Keywords-- Hydroelectric power system, Network flow, Predispatch, Primal-dual interior

Oliveira, Aurélio R. L.

129

Model-Free Based Water Level Control for Hydroelectric Power Plants  

E-Print Network (OSTI)

Model-Free Based Water Level Control for Hydroelectric Power Plants Cédric JOIN Gérard ROBERT for hydroelectric run-of-the river power plants. To modulate power generation, a level trajectory is planned, the set-point is followed even in severe operating conditions. Keywords: Hydroelectric power plants

Paris-Sud XI, Université de

130

An Approximate Method to Assess the Peaking Capability of the NW Hydroelectric System  

E-Print Network (OSTI)

DRAFT 1 An Approximate Method to Assess the Peaking Capability of the NW Hydroelectric System September 26, 2005 The best way to assess the hydroelectric system's peaking capability is to simulate its. This model simulates the operation of the major hydroelectric projects over a one-week (168 hour) period

131

Pricing Hydroelectric Power Plants with/without Operational Restrictions: a Stochastic Control Approach  

E-Print Network (OSTI)

Pricing Hydroelectric Power Plants with/without Operational Restrictions: a Stochastic Control of Waterloo, Waterloo ON, Canada N2L 3G1 Abstract. In this paper, we value hydroelectric power plant cash operational constraints may considerably overestimate the value of hydroelectric power plant cashflows. 1

Forsyth, Peter A.

132

CLIMATE CHANGE IMPACTS ON HYDROELECTRIC POWER G.P. Harrison(1),  

E-Print Network (OSTI)

CLIMATE CHANGE IMPACTS ON HYDROELECTRIC POWER G.P. Harrison(1), H.W. Whittington(1) and S.W. Gundry implications for the design, operation and viability of hydroelectric power stations. This describes attempts to predict and quantify these impacts. It details a methodology for computer based modelling of hydroelectric

Harrison, Gareth

133

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 15, 2005 Facility News More Server Power Improves Performance at the ARM Data Management Facility Bookmark and Share Recently, several new Sun servers joined the...

134

Potential Climate Change Impacts to the NW Hydroelectric System  

E-Print Network (OSTI)

Page 1 Potential Climate Change Impacts to the NW Hydroelectric System NW Power and Conservation Council Symposium on Greenhouse Gases June 4, 2013 1 Source of Data · 2009 International Panel on Climate Change (IPCC-4) data but prior to River Management Joint Operating Committee's (RMJOC) processing

135

EIS-0184: South Fork Tolt River Hydroelectric Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes the Seattle City Light, a Department of the City of Seattle proposal to construct a hydroelectric project with an installed capacity of 15 MW on the South Fork Tolt River near the town of Carnation located in King County in the State of Washington.

136

Can Fish Morphological Characteristics be Used to Re-design Hydroelectric Turbines?  

SciTech Connect

Safe fish passage affects not only migratory species, but also populations of resident fish by altering biomass, biodiversity, and gene flow. Consequently, it is important to estimate turbine passage survival of a wide range of susceptible fish. Although fish-friendly turbines show promise for reducing turbine passage mortality, experimental data on their beneficial effects are limited to only a few species, mainly salmon and trout. For thousands of untested species and sizes of fish, the particular causes of turbine passage mortality and the benefits of fish-friendly turbine designs remain unknown. It is not feasible to measure the turbine-passage survival of every species of fish in every hydroelectric turbine design. We are attempting to predict fish mortality based on an improved understanding of turbine-passage stresses (pressure, shear stress, turbulence, strike) and information about the morphological, behavioral, and physiological characteristics of different fish taxa that make them susceptible to the stresses. Computational fluid dynamics and blade strike models of the turbine environment are re-examined in light of laboratory and field studies of fish passage effects. Comparisons of model-predicted stresses to measured injuries and mortalities will help identify fish survival thresholds and the aspects of turbines that are most in need of re-design. The coupled model and fish morphology evaluations will enable us to make predictions of turbine-passage survival among untested fish species, for both conventional and advanced turbines, and to guide the design of hydroelectric turbines to improve fish passage survival.

Cada, G. F.; Richmond, Marshall C.

2011-07-19T23:59:59.000Z

137

Experience in operating and reconstructing the turbine bearings of units of the Sayano-Shushenskoe hydroelectric station  

SciTech Connect

This article reviews some of the operations and maintenance experiences at the Sayano-Shushenskoe hydroelectric sstation in Russia. In particular, the experiences gained in the operation of the turbines and the reconstruction of the turbine bearings are noted. The compact layout of this facility did not permit the traditional babbitt bearing or rubber ring bearing with water lubrication. Instead, a rubber sugmented bearing with water lubrication was used. The design and construction of this bearing, as well as the operation and maintenance of this bearing, is discussed in this article. The operating experiences have shown that the component is highly reliable.

Nikitenko, G.I.

1994-10-01T23:59:59.000Z

138

MHK Projects/Deception Pass Tidal Energy Hydroelectric Project | Open  

Open Energy Info (EERE)

Deception Pass Tidal Energy Hydroelectric Project Deception Pass Tidal Energy Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.4072,"lon":-122.643,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

139

A Study of United States Hydroelectric Plant Ownership  

SciTech Connect

Ownership of United States hydroelectric plants is reviewed from several perspectives. Plant owners are grouped into six owner classes as defined by the Federal Energy Regulatory Commission. The numbers of plants and the corresponding total capacity associated with each owner class are enumerated. The plant owner population is also evaluated based on the number of owners in each owner class, the number of plants owned by a single owner, and the size of plants based on capacity ranges associated with each owner class. Plant numbers and corresponding total capacity associated with owner classes in each state are evaluated. Ownership by federal agencies in terms of the number of plants owned by each agency and the corresponding total capacity is enumerated. A GIS application that is publicly available on the Internet that displays hydroelectric plants on maps and provides basic information about them is described.

Douglas G Hall

2006-06-01T23:59:59.000Z

140

International Energy Outlook 2000 - Hydroelectricity and Other Renewable  

Gasoline and Diesel Fuel Update (EIA)

The renewable energy share of total world energy consumption is expected to continue at a level of about 8 percent from 1997 through 2020, despite a projected 54-percent increase in consumption of hydroelectricity and other renewable resources. The renewable energy share of total world energy consumption is expected to continue at a level of about 8 percent from 1997 through 2020, despite a projected 54-percent increase in consumption of hydroelectricity and other renewable resources. The development of renewable energy sources is constrained in the International Energy Outlook 2000 (IEO2000) reference case projections by expectations that fossil fuel prices will remain low and, as a result, renewables will have a difficult time competing. Although energy prices rebounded in 1999 from 1998 lows, it remains unlikely that renewable energy can compete economically over the projection period. Failing a strong worldwide commitment to environmental considerations, such as the limitations and reductions of carbon emissions outlined in the Kyoto

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hydroelectric Developments and Engineering A Practical and Theoretical Treatise on the Development, Design, Construction, Equipment, and Operation of Hydroelectric Transmission Plants  

Science Journals Connector (OSTI)

... HYDROELECTRIC power plants do not call for the same attention in this country as in America ... The mountains and the forests, the streams and the waterfallsfor the generating stations of hydroelectric plants are usually away out among the beauties of natureall bring back memories of ...

STANLEY P. SMITH

1910-12-15T23:59:59.000Z

142

Shawmut hydroelectric redevelopment project. Final technical and construction cost report  

SciTech Connect

This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

None

1982-08-01T23:59:59.000Z

143

Karnataka power sector: a case for hydroelectric power  

Science Journals Connector (OSTI)

Karnataka, a southern state in India, flanked by the rich tropical forests of the Western Ghats, has a large potential for hydroelectric power, only a third of which has been harnessed so far. Only about two decades back, this state had surplus power/energy. The state has of late been going through an acute power crisis due to the unplanned growth of industry, unmetered energy supply to the agricultural sector, large losses in transmission, distribution and inefficient utilisation of electrical energy. Stalling of some hydroelectric projects on environmental issue and delaying the completion of some due to shortage of funds have aggravated the crisis. Coal-based thermal generators are already providing 630 MW of power and more are to be installed soon. A 470 MW nuclear generating station is about to be completed. While this drive for increasing power generation is on, the sustainability of this effort from the economic and environmental view point is being seriously questioned. An alternative end-use-oriented approach to energy planning has been proposed which is described as an 'environmentally sound development pathway'. It seems unlikely, however, that this path will be followed to its end, not at least in the near future. A prudent combination of: (a) hydroelectric power generation, large and small, (b) energy conservation and end-use-oriented energy utilisation to the extent feasible, may be the most economically and environmentally suitable option for some time to come - particularly for Karnataka State.

D.P. Sen Gupta

1997-01-01T23:59:59.000Z

144

Report to the Secretary of Energy on Beyond Design Basis Event Pilot Evaluations, Results and Recommendations for Improvements to Enhance Nuclear Safety at DOE Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE))

In the six months after the March 2011 Fukushima Daiichi nuclear power plant accident in Japan, the U.S. Department of Energy (DOE) took several actions to review the safety of its nuclear facilities and identify situations where near-term improvements could be made.

145

Improving energy efficiency in state-funded facilities through the development and use of a simplified energy audit procedure.  

E-Print Network (OSTI)

??Over the past few years, state governments and entities have become concerned with energy consumption and efficiency at their facilities. The Department of Energy has (more)

Pierson, Kimberly D.

2012-01-01T23:59:59.000Z

146

Energy Department Accepting Applications for a $3.6 Million Hydroelectric Production Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department today announced an incentive program for developers adding hydroelectric power generating capabilities to existing non-powered dams throughout the United States.

147

Illuminating The Irish Free State: Nationalism, National Identity, And The Promotion Of The Shannon Hydroelectric Scheme.  

E-Print Network (OSTI)

??This dissertation focuses on the ways in which the Shannon Hydroelectric Scheme influenced perceptions of Irishness in the fraught context of postcolonial nation building. The (more)

Sutton, McKayla Kay

2014-01-01T23:59:59.000Z

148

The Nelson River hydroelectric development : a public utility investment affecting both regional and national development.  

E-Print Network (OSTI)

??This is a study of the decision to develop hydroelectric power on the Nelson River. An historical account is given of the events leading to (more)

Cline, John Alexander

2009-01-01T23:59:59.000Z

149

E-Print Network 3.0 - alto hydroelectric power Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

; Renewable Energy 17 RENEWABLE RESOURCES DEVELOPMENT REPORT Summary: hydroelectric, and solar (photovoltaic and concentrated solar power) in California is more than 262,000...

150

Design and hydraulic characteristics of the hydromechanical equipment of an energy-storage hydroelectric station  

Science Journals Connector (OSTI)

1. The energy-storage hydroelectric station (ESHES) can provide a 1.52-fold increase in peak capacity with a si...

P. R. Khlopenkov

1976-03-01T23:59:59.000Z

151

RESULTS OF THE EXTRACTION-SCRUB-STRIP TESTING USING AN IMPROVED SOLVENT FORMULATION AND SALT WASTE PROCESSING FACILITY SIMULATED WASTE  

SciTech Connect

The Office of Waste Processing, within the Office of Technology Innovation and Development, is funding the development of an enhanced solvent - also known as the next generation solvent (NGS) - for deployment at the Savannah River Site to remove cesium from High Level Waste. The technical effort is a collaborative effort between Oak Ridge National Laboratory (ORNL) and Savannah River National Laboratory (SRNL). As part of the program, the Savannah River National Laboratory (SRNL) has performed a number of Extraction-Scrub-Strip (ESS) tests. These batch contact tests serve as first indicators of the cesium mass transfer solvent performance with actual or simulated waste. The test detailed in this report used simulated Tank 49H material, with the addition of extra potassium. The potassium was added at 1677 mg/L, the maximum projected (i.e., a worst case feed scenario) value for the Salt Waste Processing Facility (SWPF). The results of the test gave favorable results given that the potassium concentration was elevated (1677 mg/L compared to the current 513 mg/L). The cesium distribution value, DCs, for extraction was 57.1. As a comparison, a typical D{sub Cs} in an ESS test, using the baseline solvent formulation and the typical waste feed, is {approx}15. The Modular Caustic Side Solvent Extraction Unit (MCU) uses the Caustic-Side Solvent Extraction (CSSX) process to remove cesium (Cs) from alkaline waste. This process involves the use of an organic extractant, BoBCalixC6, in an organic matrix to selectively remove cesium from the caustic waste. The organic solvent mixture flows counter-current to the caustic aqueous waste stream within centrifugal contactors. After extracting the cesium, the loaded solvent is stripped of cesium by contact with dilute nitric acid and the cesium concentrate is transferred to the Defense Waste Processing Facility (DWPF), while the organic solvent is cleaned and recycled for further use. The Salt Waste Processing Facility (SWPF), under construction, will use the same process chemistry. The Office of Waste Processing (EM-31) expressed an interest in investigating the further optimization of the organic solvent by replacing the BoBCalixC6 extractant with a more efficient extractant. This replacement should yield dividends in improving cesium removal from the caustic waste stream, and in the rate at which the caustic waste can be processed. To that end, EM-31 provided funding for both the Savannah River National Laboratory (SRNL) and the Oak Ridge National Laboratory (ORNL). SRNL wrote a Task Technical Quality and Assurance Plan for this work. As part of the envisioned testing regime, it was decided to perform an ESS test using a simulated waste that simulated a typical envisioned SWPF feed, but with added potassium to make the waste more challenging. Potassium interferes in the cesium removal, and its concentration is limited in the feed to <1950 mg/L. The feed to MCU has typically contained <500 mg/L of potassium.

Peters, T.; Washington, A.; Fink, S.

2012-01-09T23:59:59.000Z

152

"1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079  

U.S. Energy Information Administration (EIA) Indexed Site

Washington" Washington" "1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079 "2. Chief Joseph","Hydroelectric","USCE-North Pacific Division",2456 "3. Transalta Centralia Generation","Coal","TransAlta Centralia Gen LLC",1596 "4. Rocky Reach","Hydroelectric","PUD No 1 of Chelan County",1254 "5. Columbia Generating Station","Nuclear","Energy Northwest",1097 "6. Wanapum","Hydroelectric","PUD No 2 of Grant County",1059 "7. Boundary","Hydroelectric","Seattle City of",1040 "8. Priest Rapids","Hydroelectric","PUD No 2 of Grant County",932

153

REGULATION AND SYSTEM INTERDEPENDENCE: EFFECTS ON THE SITING OF CALIFORNIA ELECTRICAL ENERGY FACILITIES  

E-Print Network (OSTI)

Going to SQecific End Uses Hydroelectricity 100% electricity58% transportation Hydroelectricity ! Nuclear Geothermalsupply relied on hydroelectricity, the severe droughts,

Kooser, J.C.

2013-01-01T23:59:59.000Z

154

Dam and Hydroelectric Powerplant University of Hawai`i CEE 491University of Hawai`i CEE 491  

E-Print Network (OSTI)

Karun 3 Dam and Hydroelectric Powerplant University of Hawai`i ­ CEE 491University of Hawai`i ­ CEE;Location #12;Description/Background Hydroelectric dam on Karun River Help with national energy needs

Prevedouros, Panos D.

155

Real-Time Visualization of Hydroelectric Project Based on Multilayer Object-Oriented Graphics Model  

Science Journals Connector (OSTI)

The objective of this paper is to realize the real-time visualization of hydroelectric project. Based on the object-oriented graphics modeling technology, we construct the three kinds of graphics models sorted by hierarchy---unit model, process model, ... Keywords: visualization, hydroelectric project, simulation, object-oriented graphics modeling technology, interaction

Yuan Huang; Xian-Jia Wang; Zhi-Xiu Cheng

2008-08-01T23:59:59.000Z

156

Hydroelectric power: Technology and planning. (Latest citations from the Selected Water Resources Abstracts database). Published Search  

SciTech Connect

The bibliography contains citations concerning hydroelectric power technology and planning. Reservoir, dam, water tunnel, and hydraulic gate design, construction, and operation are discussed. Water supply, flood control, irrigation programs, and environmental effects of hydroelectric power plants are presented. Mathematical modeling and simulation analysis are also discussed. (Contains 250 citations and includes a subject term index and title list.)

Not Available

1994-05-01T23:59:59.000Z

157

Hydroelectric power: Technology and planning. (Latest citations from the Selected Water Resources Abstracts database). Published Search  

SciTech Connect

The bibliography contains citations concerning hydroelectric power technology and planning. Reservoir, dam, water tunnel, and hydraulic gate design, construction, and operation are discussed. Water supply, flood control, irrigation programs, and environmental effects of hydroelectric power plants are presented. Mathematical modeling and simulation analysis are also discussed. (Contains 250 citations and includes a subject term index and title list.)

Not Available

1993-08-01T23:59:59.000Z

158

Report to the Secretary of Energy on Beyond Design Basis Event Pilot Evaluations, Results and Recommendations for Improvements to Enhance Nuclear Safety at DOE Nuclear Facilities, January 2013  

Energy.gov (U.S. Department of Energy (DOE))

In the six months after the March 2011 Fukushima Daiichi nuclear power plant accident in Japan, the U.S. Department of Energy (DOE) took several actions to review the safety of its nuclear facilities and identify situations where near-term improvements could be made. These actions and recommendations were addressed in an August 2011 report to the Secretary of Energy, Review of Requirements and Capabilities for Analyzing and Responding to Beyond Design Basis Events.

159

"1. John Day","Hydroelectric","USCE-North Pacific Division",2160  

U.S. Energy Information Administration (EIA) Indexed Site

Oregon" Oregon" "1. John Day","Hydroelectric","USCE-North Pacific Division",2160 "2. The Dalles","Hydroelectric","USCE-North Pacific Division",1823 "3. Bonneville","Hydroelectric","USCE-North Pacific Division",1093 "4. McNary","Hydroelectric","USCE-North Pacific Division",991 "5. Hermiston Power Partnership","Gas","Hermiston Power Partnership",615 "6. Boardman","Coal","Portland General Electric Co",585 "7. Beaver","Gas","Portland General Electric Co",487 "8. Klamath Cogeneration Plant","Gas","Pacific Klamath Energy Inc",470

160

Draft Guidance for Section 242 of the Energy Policy Act of 2005- Hydroelectric Production Incentive Program- July 2014  

Energy.gov (U.S. Department of Energy (DOE))

This document contains draft guidance for Section 242 of the Energy Policy Act of 2005, the "Hydroelectric Production Incentive Program"

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development  

Energy.gov (U.S. Department of Energy (DOE))

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

162

Economic effectiveness of using temporary runners on the turbines of the first line of the Nurek hydroelectric station  

Science Journals Connector (OSTI)

The installation of temporary runners at high-head hydroelectric stations provides: shortening of the station startup...

S. N. Ostroumov; K. A. Lyubitskii; V. F. Ilyushin

1972-11-01T23:59:59.000Z

163

Sources and fluxes of carbon in a large boreal hydroelectric reservoir of eastern Canada: an isotopic approach  

E-Print Network (OSTI)

Sources and fluxes of carbon in a large boreal hydroelectric reservoir of eastern Canada Hydroelectric reservoirs emit greenhouse gases (GHGs). Although a few hypothesis have been put forward at the surface of a large boreal hydroelectric reservoir of eastern Canada (Robert-Bourassa) as well

Long, Bernard

164

14 Diffusive CO2 Flux at the Air-Water Interface of the Robert-Bourassa Hydroelectric Reservoir in  

E-Print Network (OSTI)

14 Diffusive CO2 Flux at the Air-Water Interface of the Robert-Bourassa Hydroelectric Reservoir Hydroelectric reservoirs and lakes in boreal Québec produce greenhouse gases (GHG) mainly in the form of CO2 of the interface. When applied to the Robert- Bourassa hydroelectric reservoir in boreal Québec, this model

Long, Bernard

165

Proceedings of: ''Formal Methods Europe'', March 1996, Oxford, UK, LNCS 1051, Springer Automatic Verification of a Hydroelectric Power  

E-Print Network (OSTI)

Verification of a Hydroelectric Power Plant 1 Rosario Pugliese Enrico Tronci Dip. di Scienze dell@univaq.it Abstract. We analyze the specification of a hydroelectric power plant by ENEL (the Italian Electric Company we report on the analysis of a hydroelectric power plant by ENEL (the Italian Electric Company). Our

Tronci, Enrico

166

Spring-Supported thrust bearings for hydroelectric generators: Influence of oil viscosity on power loss  

Science Journals Connector (OSTI)

Energy losses in the spring-supported thrust bearings used in many large hydroelectric generator units were estimated to be small compared to the rate of energy (power) generation but, nevertheless, commercially significant. The purpose of the present study was examine the influence of oil viscosity on power loss. Experiments were performed using a test facility containing a thrust bearing of 1.2 m outer diameter and both power loss and temperature rise were measured for oils of ISO grade 32, 46 and 68, all at various oil pot temperatures. Power loss and temperature rise decreased as the viscosity of the oil in the oil pot decreased. Minimum oil film thicknesses were predicted with numerical analysis using a specialized software package (GENMAT). The accuracy of this calculation was supported by the good agreement between the temperature rise predicted by numerical analysis and the experimentally determined values. Provided film thickness were adequate to avoid any danger of wiping (10 15 ?m), the present study showed clearly that significant energy savings could be realized in the large spring-supported thrust bearings and associated guide bearings by lowering oil viscosities.

J.H. Ferguson; J.H. Yuan; J.B. Medley

1998-01-01T23:59:59.000Z

167

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Reliability Interconnect DEIS Northeast Reliability Interconnect DEIS S-1 August 2005 SUMMARY S.1 BACKGROUND S.1.1 Purpose and Need for National Environmental Policy Act Review Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by the U.S. Department of Energy (DOE) before electric transmission facilities may be constructed, operated, maintained, or connected at the U.S. international border. Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit, 345,000-volt (345-kV) alternating-current (AC) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine.

168

International Energy Outlook 1999 - Hydroelectricity and Other Renewable  

Gasoline and Diesel Fuel Update (EIA)

hydroelectricty.gif (7905 bytes) hydroelectricty.gif (7905 bytes) Renewable energy use is projected to increase by 62 percent between 1996 and 2020. Almost half the increase is expected in the developing world, where large-scale hydroelectric projects still are being undertaken. Low prices for oil and natural gas in world energy markets continued to diminish the potential for rapid development of renewable energy sources worldwide. Oil prices hit 20-year lows in 1998, in part because the Asian economic crisis resulted in lower worldwide demand. Even production cut agreements by some major oil producers, such as Saudi Arabia, Mexico, and Venezuela, failed to provide measurable price recovery during 1998. On the positive side, the Kyoto Climate Change Protocol proposals to cut greenhouse gas emissions levels may provide an opportunity for growth in

169

On the Fatigue Reliability of Hydroelectric Francis Runners  

Science Journals Connector (OSTI)

Abstract The reliability assessment of large rotating structures like hydroelectric Francis runners is often limited by our capacity to define a proper limit state combined with a relevant degradation model. In this paper, we propose that the proper limit state for fatigue reliability of such structures is the onset of high cycle fatigue (HCF). Based on this premise, a prior interval for our limit state based on available literature is presented. The prior assumptions are believed to be the first step toward validation of the applicability and suitability of the proposed model. The paper includes an overview of the theoretical background for reliability assessment of Francis turbine runners, the methodology used, and the results obtained from the information gathered from the available literature.

Martin Gagnon; Antoine Tahan; Philippe Bocher; Denis Thibault

2013-01-01T23:59:59.000Z

170

Optimization of Technical Diagnostics Procedures for Hydroelectric Power Plants  

Science Journals Connector (OSTI)

In this paper, a mathematical model is proposed for determination of the optimal solution for the maintenance system of a specific steel structure the hydraulic power plant. The aim is to obtain the maximum efficiency of the plant within existing conditions and limitations. The objective of a mathematical model is to select the diagnostics parameters, which define knowledge of the permissible reliability level and certain analytic expression, which corresponds to precisely described state of hydroelectric power plant components assembly. Model of technical diagnostics procedures optimization represents a specific approach to problems of preventive maintaining according to state. It is related to the concept of state parameters change, which represents a basis for obtaining the optimal solution for procedures of technical diagnostics. It also creates direct relations between the law of the state parameter changes and reliability of the considered power plant components.

D. Nikoli?; R.R. Nikoli?; B. Krsti?; V. Lazi?; I.. Nikoli?; I. Krsti?; V. Krsti?

2012-01-01T23:59:59.000Z

171

Productivity growth and biased technological change in hydroelectric dams  

Science Journals Connector (OSTI)

This paper analyses productivity growth and the nature of technical change in a sample of Portuguese hydroelectric generating plants over the period 2001 to 2008. In a first step, we employ the Luenberger productivity indicator to estimate and decompose productivity change. A Malmquist productivity index is also used for a comparative purpose. The results paint a picture of mixed productivity performance in the Portuguese energy sector. The first decomposition underlines that, in average, the productivity variation is explained by the technological change. Then, in a second step, we analyse the nature of this technical change by using the recent concept of parallel neutrality (Briec et al., 2006). We observe a global shift in the best practice frontier as well as in the evidence of input bias in technical change.

Walter Briec; Nicolas Peypoch; Hermann Ratsimbanierana

2011-01-01T23:59:59.000Z

172

"1. Oahe","Hydroelectric","USCE-Missouri River District",714  

U.S. Energy Information Administration (EIA) Indexed Site

Dakota" Dakota" "1. Oahe","Hydroelectric","USCE-Missouri River District",714 "2. Big Bend","Hydroelectric","USCE-Missouri River District",520 "3. Big Stone","Coal","Otter Tail Power Co",476 "4. Fort Randall","Hydroelectric","USCE-Missouri River District",360 "5. Angus Anson","Gas","Northern States Power Co - Minnesota",338 "6. Buffalo Ridge II LLC","Other Renewables","Iberdrola Renewables Inc",210 "7. Groton Generating Station","Gas","Basin Electric Power Coop",169 "8. MinnDakota Wind LLC","Other Renewables","Iberdrola Renewables Inc",150

173

Influence of Modern Hydro-Electric Power Development on the British Coal Trade  

Science Journals Connector (OSTI)

... rise to a pertinent and interesting inquiry as to the influence this widespread creation of hydroelectric energy is having, and is likely to have, upon the output and use of ... abroad.

BRYSSON CUNNINGHAM

1931-09-05T23:59:59.000Z

174

Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy is currently inviting comments from the general public on revised guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the Hydroelectric Production Incentive Program.

175

Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy is currently inviting comments from the general public on guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the Hydroelectric Production Incentive Program.

176

Pumped Hydroelectricity and Utility-Scale Batteries for Reserve Electricity Generation in New Zealand.  

E-Print Network (OSTI)

??Non-pumped hydroelectricity-based energy storage in New Zealand has only limited potential to expand to meet projected growth in electricity demand. Seasonal variations of hydro inflows (more)

Kear, Gareth

2011-01-01T23:59:59.000Z

177

Small-Hydroelectricity and Landscape Change in the Bitterroot Mountains: Public Perceptions and Attitudes.  

E-Print Network (OSTI)

??Newman, Chad, M.A. December 2007 Geography Small-Hydroelectricity and Landscape Change in the Bitterroot Mountains: Public Perceptions and Attitudes Chairperson: Dr. David D. Shively The development (more)

Newman, Chad E

2008-01-01T23:59:59.000Z

178

Hydroelectricity and landscape protection in the Highlands of Scotland, 1919 - 1980 .  

E-Print Network (OSTI)

??This thesis employs twentieth-century hydroelectric development ventures in the Highlands of Scotland as a means of exploring conflicting demands of socio-economic development and landscape protection (more)

Payne, Jill

2008-01-01T23:59:59.000Z

179

Related Financial Opportunities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

water power facilities: marine and hydrokinetic (MHK) power installations, hydroelectric power installations, and hydropower efficiency improvements. Businesses that begin...

180

Oct. 29 Webinar to Spotlight DOE Energy Programs for Tribes and First Tribally Owned Hydroelectric Facility  

Energy.gov (U.S. Department of Energy (DOE))

Attend the final webinar in the 2014 Tribal Renewable Energy Series on Wednesday, Oct. 29, to learn more about how all the pieces of the tribal energy development puzzle fit togetherplus suggest topics of interest for the 2014 series.

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection  

SciTech Connect

This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

1994-01-01T23:59:59.000Z

182

A case study on thrust bearing failures at the SO SIMO hydroelectric power plant  

Science Journals Connector (OSTI)

Abstract After twenty years without any apparent problems on their combined guide and thrust bearings, the six 280MW hydrogenerators of the So Simo Hydroelectric Power Plant were failing. The source of the failure was the melting of the thrust pad babbitt lining. The machines began showing performance failures, leading to a sudden interruption in their operation. This caused considerable losses with high direct and indirect costs. The solution proposed by the bearing manufacturer was an improvement in the bearing design and the installation of new wateroil heat exchangers. The direct cost of their solution was estimated to be US $2,400,000.00. In a search for a less expensive alternative, CEMIG started a parallel study focused on the heat exchangers. A methodology based on heat transfer was applied, indicating that an increase in the heat exchange surface area could solve the problem. A third heat exchanger was added in one machine that already possessed two. The results fulfilled the preliminary predictions, eliminating the risk of additional babbitt lining failures. As a consequence of this success modeling, heat exchangers were replaced by stainless steel plate ones in all machines. This alternative solution had a total direct cost of US $600,000.00.

Matheus P. Porto; Licnio C. Porto; Ricardo N.N. Koury; Ernani W. Soares; Fernanda G. Coelho; Luiz Machado

2013-01-01T23:59:59.000Z

183

Strategic analysis of the Great Canadian Hydroelectric Power Conflict  

Science Journals Connector (OSTI)

Abstract The contract negotiation that led to the 1969 agreement between Newfoundland and Labrador,and Quebec, is systemically analyzed within the framework of Graph Model for Conflict Resolution. The Great Canadian Hydroelectric Power Conflict has been ongoing since 1963 and shows no signs of ending. In this dispute, the Province of Quebec has the right to buy almost all of the power generated from the Upper Churchill Falls, which is located in the Labrador territory in Newfoundland and Labrador, at a very low price. Originally, the contract was signed by Churchill Falls Labrador Corporation to secure finances for the Upper Churchill Falls development. The unpopularity of the contract led to several unsuccessful attempts by the Newfoundland and Labrador Government to escape its provisions. Newfoundland and Labrador is currently negotiating to develop the Lower Churchill Project and seeking to avoid the mistakes of the first contract. Furthermore, the automatic renewal clause of the original contract is expected to cause another round of conflict in 2016. The analysis shows that, given the circumstances in which the agreement was signed, the outcome was almost inevitable. Athird party intervener rule could have remediated the damage caused by the conflict.

Yasser T. Matbouli; Keith W. Hipel; D. Marc Kilgour

2014-01-01T23:59:59.000Z

184

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study #11: Commercial Kitchen Equipment (Brochure)  

SciTech Connect

The Exchange, formerly the Army and Air Force Exchange Service (AAFES), is a joint military activity and the U.S. Department of Defense?s (DOD) oldest and largest retailer. The Exchange is taking a leadership role in water efficiency improvements in their commercial kitchens by integrating water efficiency concepts into the organization?s overall sustainability plan and objectives.

Not Available

2011-09-01T23:59:59.000Z

185

The New Generation of Uranium In Situ Recovery Facilities: Design Improvements Should Reduce Radiological Impacts Relative to First Generation Uranium Solution Mining Plants  

SciTech Connect

In the last few years, there has been a significant increase in the demand for Uranium as historical inventories have been consumed and new reactor orders are being placed. Numerous mineralized properties around the world are being evaluated for Uranium recovery and new mining / milling projects are being evaluated and developed. Ore bodies which are considered uneconomical to mine by conventional methods such as tunneling or open pits, can be candidates for non-conventional recovery techniques, involving considerably less capital expenditure. Technologies such as Uranium In Situ Leaching / In Situ Recovery (ISL / ISR - also referred to as 'solution mining'), have enabled commercial scale mining and milling of relatively small ore pockets of lower grade, and are expected to make a significant contribution to overall world wide uranium supplies over the next ten years. Commercial size solution mining production facilities have operated in the US since the mid 1970's. However, current designs are expected to result in less radiological wastes and emissions relative to these 'first' generation plants (which were designed, constructed and operated through the 1980's). These early designs typically used alkaline leach chemistries in situ including use of ammonium carbonate which resulted in groundwater restoration challenges, open to air recovery vessels and high temperature calcining systems for final product drying vs the 'zero emissions' vacuum dryers as typically used today. Improved containment, automation and instrumentation control and use of vacuum dryers in the design of current generation plants are expected to reduce production of secondary waste byproduct material, reduce Radon emissions and reduce potential for employee exposure to uranium concentrate aerosols at the back end of the milling process. In Situ Recovery in the U.S. typically involves the circulation of groundwater, fortified with oxidizing (gaseous oxygen e.g) and complexing agents (carbon dioxide, e.g) into an ore body, solubilizing the uranium in situ, and then pumping the solutions to the surface where they are fed to a processing plant ( mill). Processing involves ion exchange and may also include precipitation, drying or calcining and packaging operations depending on facility specifics. This paper presents an overview of the ISR process and the health physics monitoring programs developed at a number of commercial scale ISL / ISR Uranium recovery and production facilities as a result of the radiological character of these processes. Although many radiological aspects of the process are similar to that of conventional mills, conventional-type tailings as such are not generated. However, liquid and solid byproduct materials may be generated and impounded. The quantity and radiological character of these by products are related to facility specifics. Some special monitoring considerations are presented which are required due to the manner in which radon gas is evolved in the process and the unique aspects of controlling solution flow patterns underground. The radiological character of these processes are described using empirical data collected from many operating facilities. Additionally, the major aspects of the health physics and radiation protection programs that were developed at these first generation facilities are discussed and contrasted to circumstances of the current generation and state of the art of uranium ISR technologies and facilities. In summary: This paper has presented an overview of in situ Uranium recovery processes and associated major radiological aspects and monitoring considerations. Admittedly, the purpose was to present an overview of those special health physics considerations dictated by the in situ Uranium recovery technology, to point out similarities and differences to conventional mill programs and to contrast these alkaline leach facilities to modern day ISR designs. As evidenced by the large number of ISR projects currently under development in the U.S. and worldwide, non conventional Uranium recovery techniques

Brown, S.H. [CHP, SHB INC., Centennial, Colorado (United States)

2008-07-01T23:59:59.000Z

186

Optimize Deployment of Renewable Energy Technologies for Government Agencies, Industrial Facilities, and Military Installations: NREL Offers Proven Tools and Resources to Reduce Energy Use and Improve Efficiency (Brochure)  

SciTech Connect

The National Renewable Energy Lab provides expertise, facilities, and technical assistance to campuses, facilities, and government agencies to apply renewable energy and energy efficiency technologies.

Not Available

2010-01-01T23:59:59.000Z

187

"1. Brownlee","Hydroelectric","Idaho Power Co",744 "2. Dworshak","Hydroelectric","USCE-North Pacific Division",400  

U.S. Energy Information Administration (EIA) Indexed Site

Idaho" Idaho" "1. Brownlee","Hydroelectric","Idaho Power Co",744 "2. Dworshak","Hydroelectric","USCE-North Pacific Division",400 "3. Cabinet Gorge","Hydroelectric","Avista Corp",255 "4. Rathdrum Power LLC","Gas","Rathdrum Operating Services Co., Inc.",248 "5. Evander Andrews Power Complex","Gas","Idaho Power Co",247 "6. Palisades","Hydroelectric","U S Bureau of Reclamation",176 "7. Bennett Mountain","Gas","Idaho Power Co",164 "8. Rathdrum","Gas","Avista Corp",132 "9. Goshen Phase II","Other Renewables","AE Power Services LLC",125

188

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through Improved Management of Facility Lighting"  

SciTech Connect

The American Recovery and Reinvestment Act of 2009 (Recovery Act) highlighted the importance of reducing the Nation's dependence on foreign oil and conserving scarce energy resources. The Department of Energy, as the designated lead agency for promoting new technologies, providing leadership for energy conservation and helping Federal agencies reduce energy costs, plays a pivotal role in achieving the Recovery Act's energy related goals. The Department spends nearly $300 million per year in energy costs for its 9,000 buildings at 24 sites. Electricity costs, totaling $190 million, account for close to two-thirds of the Department's total energy expenditures, with roughly 40 percent or $76 million of those costs attributable to the cost of lighting. New lighting technologies and advanced lighting systems offer the Department the opportunity to significantly reduce energy consumption; decrease operating costs at its sites throughout the country; and, demonstrate the benefits of using new lighting technologies that are currently being developed in its laboratories and by other sources. Because of its energy conservation leadership role, we initiated this audit to determine whether the Department's facilities had implemented lighting conservation measures.

None

2010-06-01T23:59:59.000Z

189

Improved  

NLE Websites -- All DOE Office Websites (Extended Search)

Improved Improved cache performance in Monte Carlo transport calculations using energy banding A. Siegel a , K. Smith b , K. Felker c,∗ , P . Romano b , B. Forget b , P . Beckman c a Argonne National Laboratory, Theory and Computing Sciences and Nuclear Engineering Division b Massachusetts Institute of Technology, Department of Nuclear Science and Engineering c Argonne National Laboratory, Theory and Computing Sciences Abstract We present an energy banding algorithm for Monte Carlo (MC) neutral parti- cle transport simulations which depend on large cross section lookup tables. In MC codes, read-only cross section data tables are accessed frequently, ex- hibit poor locality, and are typically much too large to fit in fast memory. Thus, performance is often limited by long latencies to RAM, or by off-node communication latencies when the data footprint is very large and must be decomposed on

190

USING BALD EAGLES TO MONITOR HYDROELECTRIC PROJECTS LISCENSE REQUIREMENTS ALONG THE AU SABLE, MANISTEE AND MUSKEGON RIVER, MICHIGAN.  

E-Print Network (OSTI)

??Consumers Energy operated hydroelectric projects located along the Au Sable, Manistee, and Muskegon Rivers underwent environmental studies in the late 1980s and early 1990s as (more)

Datema, Peter

2012-01-01T23:59:59.000Z

191

Underwater noise generated by Columbia River hydroelectric dams  

Science Journals Connector (OSTI)

Low?frequency (101000 Hz) underwater noise measurements have been made in water within and upstream from four Columbia River hydroelectric dams. The motivation for these measurements was to map out the sound field within and upstream from the power dams as a first step in understanding the effect of this field on the behavior of migrating salmonids that must choose between the bypass system or intakes to the turbines. Eventually sound may be used to guide the juvenile fish safely past the turbine intakes and into the bypass system. Thus far single hydrophonemeasurements have been made in the bypass slots within the dam and at a number of locations upstream from the dam. The noise level varies with location decreasing as the hydrophone is moved upsteam from the dam and as the hydrophone is moved closer to the water surface immediately upstream of the dam as well as in the bypass slot. The noise spectra below 200 Hz are highly modulated displaying one or more sharp peaks which indicates resonances in the structural generating mechanism or propagation path. The spectrum level and modulation vary significantly from one dam to another and sometimes from one configuration to another (e.g. when one of the turbines is on or off). A final set of measurements will be made at the Bonneville Dam using several hydrophones placed at a number of locations in the vicinity of the intake channel and these may help identify sources and propagation paths to the hydrophone. [Work sponsored by U. S. Army Corps of Engineers.

Robert T. Miyamoto; Steven O. McConnell; James J. Anderson; Blake E. Feist

1989-01-01T23:59:59.000Z

192

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study #11: Commercial Kitchen Equipment (Brochure), Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kitchens are often forgotten when people kitchens are often forgotten when people begin to think about performing water audits. Kitchens can be out of sight, out of mind; a commercial kitchen, however, can consume large amounts of water and energy if inefficient appliances are installed. The Exchange, formerly the Army and Air Force Exchange Service (AAFES), is taking a leadership role in water efficiency improvements in their commercial kitchens by integrating water efficiency concepts into the organization's overall sustainability plan and objectives. The Exchange is a joint military activity, the U.S. Department of Defense's (DOD) oldest and largest retailer. The Exchange provides merchandise and services to military personnel, operating more than 3,100 facilities FEDERAL ENERGY MANAGEMENT PROGRAM

193

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study #11: Commercial Kitchen Equipment (Brochure), Federal Energy Management Program (FEMP)  

NLE Websites -- All DOE Office Websites (Extended Search)

kitchens are often forgotten when people kitchens are often forgotten when people begin to think about performing water audits. Kitchens can be out of sight, out of mind; a commercial kitchen, however, can consume large amounts of water and energy if inefficient appliances are installed. The Exchange, formerly the Army and Air Force Exchange Service (AAFES), is taking a leadership role in water efficiency improvements in their commercial kitchens by integrating water efficiency concepts into the organization's overall sustainability plan and objectives. The Exchange is a joint military activity, the U.S. Department of Defense's (DOD) oldest and largest retailer. The Exchange provides merchandise and services to military personnel, operating more than 3,100 facilities FEDERAL ENERGY MANAGEMENT PROGRAM

194

Improvement of the double crystal diffractometer at the Geesthacht Neutron Facility (GeNF) by means of perfect channel-cut silicon crystals  

Science Journals Connector (OSTI)

High resolution small-angle neutron scattering (HR-SANS) investigations have been performed by means of the double crystal diffractometer (DCD) at the Geesthacht Neutron Facility (GeNF). The two single perfect silicon crystals of the instrument have recently been replaced by channel-cut ones in the non-dispersive (1, ?1) setting to reduce the intensity of the rocking curve in its wings by three-fold reflections. Thereby a very strong decrease of this intensity has been achieved, whereby its former dependence on the scattering vector q of q?2 has been changed to q?6. This improvement of the rocking curve leading to a reduction of the inherent background is presented, and a new perspective for future HR-SANS investigations is pointed out.

D Bellmann; M Klatt; R Kampmann; R Wagner

1997-01-01T23:59:59.000Z

195

EIS-0166: Bangor Hydro-Electric Transmission Line, Maine  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy prepared this environmental impact statement while considering whether to authorize a Presidential permit for Bangor Hydro to construct a new electric transmission facility at the U.S. border with Canada.

196

National Environmental Justice Advisory Council Federal Facilities Working Group Report  

Energy.gov (U.S. Department of Energy (DOE))

Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004

197

Water-Power Development, Conservation of Hydroelectric Power Dams and Works  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water-Power Development, Conservation of Hydroelectric Power Dams Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Systems Integrator Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Siting and Permitting Provider Virginia State Corporation Commission It is the policy of the Commonwealth of Virginia to encourage the utilization of its water resources to the greatest practicable extent, to control the waters of the Commonwealth, and also to construct or reconstruct dams in any rivers or streams within the Commonwealth for the

198

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Quality Improvement Inspections Take Place Annual Quality Improvement Inspections Take Place Bookmark and Share During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. The Continuous Quality Improvement Program (CQIP) implemented by the ARM Program in 1998 requires annual audits and inspection visits to each of the ARM Climate Research Facility Southern Great Plains (SGP) site's 27 field facilities located in Oklahoma and Kansas. A small team of scientists and engineers conduct the inspections each year to evaluate the field

199

Effects of Climate Change on the Hydroelectric The Council is not tasked, nor does it have the resources to resolve existing uncertainties  

E-Print Network (OSTI)

Effects of Climate Change on the Hydroelectric System SUMMARY The Council is not tasked, nor does at hydroelectric dams when Northwest demands and power market values are likely to grow due to higher air

200

Image courtesy of the Image Science & Analysis Laboratory, NASA Johnson Space Center (ISS006-E-42326). The hydroelectrical potential of North-Western  

E-Print Network (OSTI)

-42326). #12;The hydroelectrical potential of North-Western Patagonia ­ balancing economic development and ecological protection axel borsdorf #12;156 The hydroelectrical potential of North-Western Patagonia the rest an expansion of the hydroelectric potential, first proposed 30 years ago (Borsdorf 1987: 156ff), can

Borsdorf, Axel

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

The Energy Improvement and Extension Act of 2008 Division B of Public Law 110-343 Select News and Analysis  

E-Print Network (OSTI)

development, and wind, solar, geothermal and hydro-electric power. It establishes electricity as a clean in consumer tax credit information, hybrid and diesel vehicle tax credit, home energy-efficiency improvement

Collins, Gary S.

202

REGULATION AND SYSTEM INTERDEPENDENCE: EFFECTS ON THE SITING OF CALIFORNIA ELECTRICAL ENERGY FACILITIES  

E-Print Network (OSTI)

nuclear, geothermal and hydroelectric power plants, isENERGY Nuclear Natural gas Hydroelectric Year Notes: a) Coalclusters. First, the hydroelectric plants are clustered in

Kooser, J.C.

2013-01-01T23:59:59.000Z

203

Water development for hydroelectric in southeastern Anatolia project (GAP) in Turkey  

Science Journals Connector (OSTI)

Southeastern Anatolia Project (GAP) region in Turkey is rich in water for irrigation and hydroelectric power. The Euphrates and Tigris rivers represent over 28% of the nations water supply by rivers, and the economically irrigable areas in the region make up 20% of those for the entry country. On the other hand, 85% of the total hydro capacity in operation has been developed by DSI, corresponding to 9931MW (49 hydro plants) and 35,795GWh/year respectively. The largest and most comprehensive regional development project ever implemented by DSI in Turkey is The Southeast Anatolian (GAP) Project, which is located in the region of Southeast Anatolia on the Euprates and Tigris rivers and their tributaries, which originate in Turkey. The energy potential of the Tigris and Euphrates is estimated as 12,000GWh and 35,000GWh, respectively. These two rivers constitute 10% and 30% of the total hydroelectric energy potential. The GAP region will be an important electric power producer with 1000MW installed capacity from the Karakaya dam, 2400MW installed capacity from the Atatrk dam and 1360MW installed capacity from the Keban dam. The GAP region has a 22% share of the countrys total hydroelectric potential, with plans for 22 dams and 19 hydroelectric power plants. Once completed, 27 billionkWh of electricity will be generated annually.

Ibrahim Yuksel

2012-01-01T23:59:59.000Z

204

What is the role of hydroelectric power in the United States?  

Reports and Publications (EIA)

The importance of hydropower as a source of electricity generation varies by geographic region. While hydropower accounted for 6% of total U.S. electricity generation in 2010, it provided over half of the electricity in the Pacific Northwest. Because hydroelectric generation relies on precipitation, it varies widely from month to month and year to year.

2011-01-01T23:59:59.000Z

205

Report on technical feasibility of underground pumped hydroelectric storage in a marble quarry site in the Northeast United States  

SciTech Connect

The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. The study concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site even with the proposed savings from marketable material amounts to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. System studies performed by the planning group of the New England Power System indicate that the system could economically justify up to about $442 per kilowatt on an energy basis with no credit for capacity. To accommodate the plant with the least expensive pumping energy, a coal and nuclear generation mix of approximately 65% would have to be available before the project becomes feasible. It is not expected that this condition can be met before the year 2000 or beyond. It is therefore concluded that the West Rutland underground pumped storage facility is uneconomic at this time. Several variables however could have marked influence on future planning and should be examined on periodic basis.

Chas. T. Main, Inc.

1982-03-01T23:59:59.000Z

206

LANSCE | Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Isotope Production Facility (IPF) Lujan Neutron Scattering Center Materials Test Station (MTS) Proton Radiography (pRad) Ultracold Neutrons (UCN) Weapons Neutron Research Facility...

207

The Impacts of Wind Power Integration on Sub-Daily Variation in River Flows Downstream of Hydroelectric Dams  

Science Journals Connector (OSTI)

The Impacts of Wind Power Integration on Sub-Daily Variation in River Flows Downstream of Hydroelectric Dams ... Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. ... In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). ...

Jordan D. Kern; Dalia Patino-Echeverri; Gregory W. Characklis

2014-07-25T23:59:59.000Z

209

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

210

Improvement of the effectiveness of spillway operation of high-head hydroelectric stations  

Science Journals Connector (OSTI)

1. The distance of deflection of a high-head aerated flow being discharged from spillways decreases in proportio...

P. R. Khlopenkov

1987-04-01T23:59:59.000Z

211

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-1063-2006 April 2006 Superseding DOE-STD-1063-2000 March 2000 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2006 ii Available on the Department of Energy Technical Standards Program web site at http://www.eh.doe.gov/techstds/ DOE-STD-1063-2006 iii FOREWORD 1. This Department of Energy standard is approved for use by all DOE Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should

212

Water quality and sedimentation implications of installing a hydroelectric dam on the Ro Baker in Chilean Patagonia  

E-Print Network (OSTI)

HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

Leandro, Gianna Dee

2009-01-01T23:59:59.000Z

213

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

16, 2008 [Facility News] 16, 2008 [Facility News] Revised Convective Triggering Mechanism Improves Precipitation Forecast Bookmark and Share Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). An improved convective triggering mechanism developed by ARM scientists based on ARM observations was implemented recently in the Global Spectral Model at the Japan Meteorological Agency (JMA) to improve surface precipitation forecasts. The revised triggering mechanism uses a dynamic convective available potential energy generation rate (DCAPE) to control the onset of deep convection. It assumes that deep convection occurs only when the large-scale dynamic forcing makes a positive

214

Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS  

NLE Websites -- All DOE Office Websites (Extended Search)

High Wind Power High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Technical Report NREL/TP-5500-52251 July 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Prepared under Task No. WE110810 Technical Report NREL/TP-5500-52251 July 2011 NOTICE

215

MHK Projects/Lock and Dam No 2 Hydroelectric Project | Open Energy  

Open Energy Info (EERE)

Lock and Dam No 2 Hydroelectric Project Lock and Dam No 2 Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.7486,"lon":-92.8048,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

216

Legal obstacles and incentives to the development of small scale hydroelectric potential in Wisconsin  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The initial obstacle that all developers confront in Wisconsin is obtaining the authority to utilize the bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Wisconsin follows the riparian theory of water law.

None,

1980-05-01T23:59:59.000Z

217

Exploitation of temporary water flow by hybrid PV-hydroelectric plant  

Science Journals Connector (OSTI)

The paper presents a new type of Renewable Energy Sources (RES) suitable for exploitation watercourse with periodical-temporary water flow. This innovative solution consist of Hydroelectric Plant (HEP) and solar Photovoltaic (PV) generator working together as one hybrid power plant, producing green energy with the same characteristics as classical hydroelectric plants. The main objective of this hybrid solution is achievement of optimal renewable energy production in order to increase the share of RES in an Electricity Power System (EPS). As a paradigm of such exploitation of RES, the example of HEP Zavrelje/Dubrovnik in Croatia was used, where it was ascertained that the proposed solution of hybrid PV-HEP system is natural, realistic and very acceptable, which enhances the characteristics of both energy sources. The application of such hybrid systems would increase the share of high quality RES in energy systems.

Jure Margeta; Zvonimir Glasnovic

2011-01-01T23:59:59.000Z

218

Induced hydroelectric energy generated by compressing a single-walled carbon nanotube hydrogel  

Science Journals Connector (OSTI)

Using single-walled carbon nanotubes (SWCNTs) for energy harvesting and storage have attracted much attention recently because SWCNTs have supercapacity performance. In this paper we report a simple electromechanical approach for the generation of induced electrical potential by the compression of a SWCNT-triggered sodium deoxycholate hydrogel. This hydrogel enhances the electrical potential generated under compression and this is mainly because of the generation of hydroelectric power by the flow of water over the SWCNTs. The induced voltage was 63.1?mV upon the compression of a 4% SWCNT hydrogel to a compression ratio of 50% which is superior to values reported previously. The enhancement in hydroelectric potential increased with SWCNT loading in the hydrogel and with the compression ratio because of an enhancement of the impact frequency between water molecules and the SWCNTs.

2014-01-01T23:59:59.000Z

219

Legal obstacles and incentives to the development of small scale hydroelectric potential in Illinois  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of the hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The first obstacle which every developer in Illinois must confront is obtaining authority to utilize the river bed, banks, and flowing water at the proposed site. This involves determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Illinois follows the riparian theory of water law. Following the detailed discussion of the water law, direct and indirect regulations and financial considerations are discussed.

None,

1980-05-01T23:59:59.000Z

220

Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.  

SciTech Connect

This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

Bissell, Gael

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Giant otter population responses to habitat expansion and degradation induced by a mega hydroelectric dam  

Science Journals Connector (OSTI)

Abstract Large hydroelectric dams are major drivers of habitat loss and degradation in lowland Amazonia. Hydroelectric reservoirs reduce the habitat available for terrestrial species, but create new open-water and shoreline lake habitat that can potentially boost populations of aquatic and semi-aquatic species, such as the threatened giant otter (Pteronura brasiliensis). To assess the impacts of mega-dams on this apex-predator, we surveyed the giant otter population across the 443,772-hectare Balbina Hydroelectric Reservoir of central Brazilian Amazonia between 14 and 25years after this reservoir creation. We compared changes in habitat area and estimated giant otter population size between the reservoir pre- and post-filling stages. The Balbina dam created ?3525 islands and increased the open-water surface and total reservoir perimeter available to otters by a factor of 62.7 and 8.9, respectively. Some 25years after damming, however, the estimated post-filling giant otter population size was only twice greater than that estimated before filling and 4.5 times smaller than would be predicted given the total available habitat area and density of dens quantified at a neighbouring undisturbed area used as a surrogate of the pre-filling phase. The observed mismatch between the proportional increase in otter population size and the much greater newly available reservoir habitat area is likely due to low habitat quality in terms of low fish prey productivity and scarcity of suitable sites for denning and territory demarcation. This should be considered in strategic environmental impact assessments of planned hydroelectric dams and in managing existing and future hydropower development in lowland tropical forests.

Ana Filipa Palmeirim; Carlos A. Peres; Fernando C.W. Rosas

2014-01-01T23:59:59.000Z

222

Effects of hydroelectric turbine passage on fish early life stages  

SciTech Connect

Turbine-passage mortality has been studied extensively for juveniles and adults of migratory fish species, but few studies have directly quantified mortality of fish eggs and larvae. An analysis of literature relating to component stresses of turbine passage (i.e., pressure changes, blade contact, and shear) indicates that mortality of early life stages of fish would be relatively low at low-head, bulb turbine installations. The shear forces and pressure regimes normally experienced are insufficient to cause high mortality rates. The probability of contact with turbine blades is related to the size of the fish; less than 5% of entrained ichthyoplankton would be killed by the blades in a bulb turbine. Other sources of mortality (e.g., cavitation and entrainment of fish acclimated to deep water) are controlled by operation of the facility and thus are mitigable. Because turbine-passage mortality among fish early life stages can be very difficult to estimate directly, it may be more fruitful to base the need for mitigation at any given site on detailed knowledge of turbine characteristics and the susceptibility of the fish community to entrainment. 7 refs., 1 fig.

Cada, G.F.

1991-01-01T23:59:59.000Z

223

Legal obstacles and incentives to the development of small scale hydroelectric power in New York  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

None,

1980-05-01T23:59:59.000Z

224

Facility Safety  

Directives, Delegations, and Requirements

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

1996-10-24T23:59:59.000Z

225

Facility Safety  

Directives, Delegations, and Requirements

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

1995-11-16T23:59:59.000Z

226

Certified Facilities  

Energy.gov (U.S. Department of Energy (DOE))

Industrial Leaders: The industrial facilities shown below are among the first to earn certification for Superior Energy Performance (SEP).

227

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Backup Software Improves Processing, Reliability at Data Management New Backup Software Improves Processing, Reliability at Data Management Facility Bookmark and Share Real-time data from all three of the ARM Climate Research Facility sites (North Slope of Alaska, Southern Great Plains, and Tropical Western Pacific) are collected and processed at the ARM Climate Research Facility Data Management Facility (DMF) each day. Processing involves the application of algorithms for performing simple averaging routines, qualitative comparisons, or more complicated experimental calculations. With continual advances in computer technology, keeping up with the volume and pace of incoming data is a daunting challenge. And because the remote sites do not provide backups, reliable backups of these data at the DMF are critical. In addition, significant numbers of value-added datasets are

228

The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations  

SciTech Connect

One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000) found useful turbine passage survival data for only 30 species. Tests of advanced hydropower turbines have been limited to seven species - Chinook and coho salmon, rainbow trout, alewife, eel, smallmouth bass, and white sturgeon. We are investigating possible approaches for extending experimental results from the few tested fish species to predict turbine passage survival of other, untested species (Cada and Richmond 2011). In this report, we define the causes of injury and mortality to fish tested in laboratory and field studies, based on fish body shape and size, internal and external morphology, and physiology. We have begun to group the large numbers of unstudied species into a small number of categories, e.g., based on phylogenetic relationships or ecological similarities (guilds), so that subsequent studies of a few representative species (potentially including species-specific Biological Index Testing) would yield useful information about the overall fish community. This initial effort focused on modifying approaches that are used in the environmental toxicology field to estimate the toxicity of substances to untested species. Such techniques as the development of species sensitivity distributions (SSDs) and Interspecies Correlation Estimation (ICE) models rely on a considerable amount of data to establish the species-toxicity relationships that can be extended to other organisms. There are far fewer studies of turbine passage stresses from which to derive the turbine passage equivalent of LC{sub 50} values. Whereas the SSD and ICE approaches are useful analogues to predicting turbine passage injury and mortality, too few data are available to support their application without some form of modification or simplification. In this report we explore the potential application of a newer, related technique, the Traits-Based Assessment (TBA), to the prediction of downstream passage mortality at hydropower projects.

Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

2012-04-01T23:59:59.000Z

229

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2009 [Facility News] , 2009 [Facility News] Mobile Facility Begins Marine Cloud Study in the Azores Bookmark and Share Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Extended deployment will obtain seasonal statistics to improve climate models Today marks the beginning of a 20-month field campaign on Graciosa Island in the Azores to study the seasonal life cycle of marine clouds and how they modulate the global climate system. Sponsored by the U.S. Department

230

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2005 [Facility News] 30, 2005 [Facility News] Coastal Clouds Field Campaign Takes Off in July Bookmark and Share The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. Since March 2005, the ARM Mobile Facility (AMF) has been at Point Reyes National Seashore in northern California for the Marine Stratus Radiation, Aerosol, and Drizzle Intensive Operational Period. The goals of this 6-month field campaign are to collect data from cloud/aerosol interactions and to improve understanding of cloud organization that is often associated

231

Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA  

SciTech Connect

Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams such as voluntary spill discharge, turbine intake guidance screens, and surface flow outletsare instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

2008-07-29T23:59:59.000Z

232

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 25, 2007 [Data Announcements, Facility News] April 25, 2007 [Data Announcements, Facility News] New, Improved Algorithm for Retrieving Liquid Water Path Now Available at the ARM Data Archive Bookmark and Share The MWRRET product uses an improved retrieval technique and a method to identify and remove biases from the data to greatly improve the retrieved LWP (blue). It also performs so-called physical retrievals at each radiosonde launch time (black dots)-physical retrievals are the best possible retrieval that can be performed. The MWRRET product uses an improved retrieval technique and a method to identify and remove biases from the data to greatly improve the retrieved LWP (blue). It also performs so-called physical retrievals at each radiosonde launch time (black dots)-physical retrievals are the best

233

"1. Colstrip","Coal","PPL Montana LLC",2094 "2. Noxon Rapids","Hydroelectric","Avista Corp",568  

U.S. Energy Information Administration (EIA) Indexed Site

Montana" Montana" "1. Colstrip","Coal","PPL Montana LLC",2094 "2. Noxon Rapids","Hydroelectric","Avista Corp",568 "3. Libby","Hydroelectric","USCE-North Pacific Division",525 "4. Hungry Horse","Hydroelectric","U S Bureau of Reclamation",428 "5. Yellowtail","Hydroelectric","U S Bureau of Reclamation",287 "6. Kerr","Hydroelectric","PPL Montana LLC",206 "7. Fort Peck","Hydroelectric","USCE-Missouri River District",200 "8. J E Corette Plant","Coal","PPL Montana LLC",154 "9. Judith Gap Wind Energy Center","Other Renewables","Invenergy Services LLC",135

234

Science Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Electron Microscopy Lab Ion Beam Materials Lab Matter-Radiation Interactions in Extremes (MaRIE) Proton Radiography Trident Laser Facility LOOK INTO LANL - highlights...

235

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2006 [Facility News] April 30, 2006 [Facility News] Disdrometer Joins Tipping Bucket to Improve Precipitation Measurements Bookmark and Share At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. This spring, a pair of new distrometers began collecting data at the ARM Southern Great Plains (SGP) site and the ARM Darwin site in the Tropical

236

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 28, 2006 [Facility News] February 28, 2006 [Facility News] Network of Infrared Thermometers Nearly Complete at SGP Bookmark and Share Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. As reported in April 2005, a network of infrared thermometers (IRT) is being installed throughout the ARM Southern Great Plains (SGP) site for the purpose of measuring cloud base temperature and inferring cloud base height across the domain. These measurements will enhance existing SGP surface and satellite cloud measurements to help scientists improve their calculations of heating rate profiles on the scale of global climate models. The first

237

Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

None,

1980-05-01T23:59:59.000Z

238

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facility Improvements Continue at North Slope of Alaska Locale User Facility Improvements Continue at North Slope of Alaska Locale Bookmark and Share The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. Two things are critical for conducting scientific research: adequate equipment and power. This is especially true in the Arctic, where average winter temperatures hover around -30 degrees Celsius, and access to additional resources is limited. After experiencing crowded working conditions during complex field campaigns last year, followed by several power outages this past winter, operations staff at the ARM Climate Research Facility's North Slope of Alaska (NSA) locale began implementing

239

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2011 [Facility News] 5, 2011 [Facility News] Atmospheric System Research Announces Funding Opportunity Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. Successful applications will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve fundamental

240

AWA Facility Expansion  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Upgrade Facility Upgrade Wei Gai High Energy Physics Division June 16, 2009 Background * AWA Group has been receiving very positive DOE Review evaluations in the last several years. * DOE funding has been constant or increasing, even in years with general budget cuts. * Outstanding scientific results have been achieved in recent years using the unique AWA electron beam capabilities (100 MV/m accelerating gradient). * General infrastructure in building 366 has improved in recent years (air-conditioner, better lighting, new laboratory space), creating a much better environment for conducting the AWA research program. * Additional RF power station (a second klystron) is being commissioned and it will improve the capabilities of the facility. Recent Budget Increase * Very positive DOE review (Dec. 2008) and

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 10, 2010 [Facility News] March 10, 2010 [Facility News] Atmospheric System Research Funding Opportunity Announced Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. If the application is successful, the research will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve

242

Facility Safety  

Directives, Delegations, and Requirements

This Order establishes facility and programmatic safety requirements for Department of Energy facilities, which includes nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards mitigation, and the System Engineer Program. Cancels DOE O 420.1A. DOE O 420.1B Chg 1 issued 4-19-10.

2005-12-22T23:59:59.000Z

243

Mobile Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Facility AMF Information Science Architecture Baseline Instruments AMF1 AMF2 AMF3 Data Operations AMF Fact Sheet Images Contacts AMF Deployments Hyytiälä, Finland, 2014 Manacapuru, Brazil, 2014 Oliktok Point, Alaska, 2013 Los Angeles, California, to Honolulu, Hawaii, 2012 Cape Cod, Massachusetts, 2012 Gan Island, Maldives, 2011 Ganges Valley, India, 2011 Steamboat Springs, Colorado, 2010 Graciosa Island, Azores, 2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 Mobile Facilities Pictured here in Gan, the second mobile facility is configured in a standard layout. Pictured here in Gan, the second mobile facility is configured in a standard layout. To explore science questions beyond those addressed by ARM's fixed sites at

244

Measuring and moderating the water resource impact of biofuel production and trade  

E-Print Network (OSTI)

used directly for hydroelectric power generation, produces at its hydroelectric facilities more power 2010). 6.4.4 Hydroelectric power Hydroelectricity is

Fingerman, Kevin Robert

2012-01-01T23:59:59.000Z

245

Fabrication and Characterization of Organic/Inorganic Photovoltaic Devices  

E-Print Network (OSTI)

facilities. Worldwide, hydroelectricity and wind are the twothe same with the hydroelectricity power plants; instead of

Guvenc, Ali Bilge

2012-01-01T23:59:59.000Z

246

Innovative reservoir sediments reuse and design for sustainability of the hydroelectric power plants  

Science Journals Connector (OSTI)

Abstract In the process of producing hydroelectricity, plants all over the world are faced with the problem of reservoir sediment. If this sediment is removed but not properly disposed of, it can become a secondary pollutant. This study proposes a way to resolve this problem through reuse and recycling. In this study, the process is based on Design for Six Sigma (DFSS) where reservoir sediment and the masonry waste from the construction industry are combined with cement and a curing agent. The resulting mixture transforms into a high strength, non-sintered cured brick after 28 days of natural curing. This product is a new walling material that is friendly to environment, fulfill the goal of energy conservation, waste recycle, protect ecosystems, and promote sustainable development. Large scale recycling of reservoir sediment solves the problems that reservoir sediment poses, as well as increasing the capacity of reservoirs and the effectiveness of hydroelectric power plants. The green milestone reached by the technology is of great industrial, economic and social significance.

Yung-Lung Cheng; Hui-Ming Wee; Ping-Shun Chen; Yu-Yu Kuo; Guang-Jin Chen

2014-01-01T23:59:59.000Z

247

Drivers of phytoplankton, bacterioplankton, and zooplankton carbon biomass in tropical hydroelectric reservoirs  

Science Journals Connector (OSTI)

Abstract Studies of carbon sources in plankton communities are important because carbon content has become the main currency used in functional studies of aquatic ecosystems. We evaluated the contribution to the total organic carbon pool from different plankton communities (phytoplankton, bacterioplankton, and zooplankton C-biota) and its drivers in eight tropical hydroelectric reservoirs with different trophic and hydrological status and different physical features. Our systems were separated into three groups based on trophic status and water residence time: (i) mesotrophic with low residence time (ML); (ii) mesotrophic with high residence time (MH); and (iii) eutrophic with low residence time (EL). Our hypothesis that reservoirs with low water residence times and low nutrient concentrations would show the lowest C-biota was supported. Phytoplankton carbon (C-phy) showed the highest concentrations in the EL, followed by MH and ML systems. The EL group also showed significantly higher zooplankton carbon (C-zoo). No significant difference was observed for bacteria carbon (C-bac) among the three system groups. In addition to trophic status and water residence time, regression analyses revealed that water temperature, light, pH, and dissolved organic carbon concentrations were the main drivers of plankton communities in these large tropical hydroelectric reservoirs.

Lcia H.S. Silva; Vera L.M. Huszar; Marcelo M. Marinho; Luciana M. Rangel; Jandeson Brasil; Carolina D. Domingues; Christina C. Branco; Fbio Roland

2014-01-01T23:59:59.000Z

248

Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

None,

1980-05-01T23:59:59.000Z

249

The impact of Chinas national essential medicine system on improving rational drug use in primary health care facilities: an empirical study in four provinces  

Science Journals Connector (OSTI)

The National Essential Medicine System (NEMS) is a new policy in China launched in 2009 to improve the appropriate use of medications. This study aims to examine the outcomes of the NEMS objectives in terms of...

Yan Song; Ying Bian; Max Petzold; Lingui Li; Aitian Yin

2014-10-01T23:59:59.000Z

250

S. 737: A Bill to extend the deadlines applicable to certain hydroelectric projects, and for other purposes. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session  

SciTech Connect

This bill was proposed to extend the deadlines applicable to certain hydroelectric projects, and for other purposes. The bill proposes extending the deadlines applying to certain hydroelectric projects in West Virginia, Kentucky, Washington, Oregon, and Arkansas. It proposes limited exemptions for licensing provisions for a power transmission project in New Mexico, extends Alaska`s state jurisdiction over small hydroelectric projects in the state, and amends the jurisdiction of FERC for licensing fresh water hydroelectric projects in Hawaii.

NONE

1995-12-31T23:59:59.000Z

251

Facility Safety  

Directives, Delegations, and Requirements

To establish facility safety requirements for the Department of Energy, including National Nuclear Security Administration. Cancels DOE O 420.1. Canceled by DOE O 420.1B.

2002-05-20T23:59:59.000Z

252

Facility Safety  

Directives, Delegations, and Requirements

The objective of this Order is to establish facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. The Order has Change 1 dated 11-16-95, Change 2 dated 10-24-96, and the latest Change 3 dated 11-22-00 incorporated. The latest change satisfies a commitment made to the Defense Nuclear Facilities Safety Board (DNFSB) in response to DNFSB recommendation 97-2, Criticality Safety.

2000-11-20T23:59:59.000Z

253

Facility Safety  

Directives, Delegations, and Requirements

The order establishes facility and programmatic safety requirements for nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and the System Engineer Program.Chg 1 incorporates the use of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 420.1A.

2005-12-22T23:59:59.000Z

254

Facility Safety  

Directives, Delegations, and Requirements

DOE-STD-1104 contains the Department's method and criteria for reviewing and approving nuclear facility's documented safety analysis (DSA). This review and approval formally document the basis for DOE, concluding that a facility can be operated safely in a manner that adequately protects workers, the public, and the environment. Therefore, it is appropriate to formally require implementation of the review methodology and criteria contained in DOE-STD-1104.

2013-06-21T23:59:59.000Z

255

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

More Storage Space, Better Reliability Now at the ARM Data Management More Storage Space, Better Reliability Now at the ARM Data Management Facility Bookmark and Share To support the ever-increasing file storage needs of the ARM Data Management Facility (DMF) and ARM Engineering computers, a Network Appliance (NetApp®) file server with 2.68 terabytes, or 2.95 trillion bytes, of highly-reliable and extremely-fast, usable disk storage joined the DMF servers. The NetApp system performs nearly four times faster than the previous file server and is engineered for a higher degree of reliability-critical improvements needed to maintain uptime for ARM data availability at the DMF. A NetApp server increases ARM storage capacity and keeps the data flowing at the Data Management Facility. A NetApp server increases ARM storage capacity and keeps the data flowing

256

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 23, 2008 [Data Announcements, Facility News] July 23, 2008 [Data Announcements, Facility News] Second Version of Long-Term Climate Modeling Best Estimate Data Released Bookmark and Share Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. With major improvements in the cloud fraction, cloud liquid water path (LWP), precipitable water vapor (PWV), and surface radiative fluxes, a new version of the "Climate Modeling Best Estimate" (CMBE) is now available from the ARM Climate Research Facility Archive. This data set, specifically tailored for use in evaluating global climate models, includes long-term

257

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

258

Incorporating daily flood control objectives into a monthly stochastic dynamic programming model for a hydroelectric complex  

SciTech Connect

A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model established the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

Druce, D.J. (British Columbia Hydro and Power Authority, Vancouver, British Columbia (Canada))

1990-01-01T23:59:59.000Z

259

A HIRARC model for safety and risk evaluation at a hydroelectric power generation plant  

Science Journals Connector (OSTI)

Abstract There are many formal techniques for the systematic analysis of occupational safety and health in general, and risk analysis in particular, for power generation plants at hydroelectric power stations. This study was initiated in order to create a HIRARC model for the evaluation of environmental safety and health at a hydroelectric power generation plant at Cameron Highlands in Pahang, Malaysia. The HIRARC model was used to identify the primary and secondary hazards which may be inherent in the system which were determined as a serious threat for plant operation and maintenance. The primary tools of the model consisted of, generic check-lists, work place inspection schemes which included task observation and interview, safety analysis as well as accident and incident investigation. For risk assessment, the Likert scale was complemented by the severity matrix analysis in order to determine the probability and extent of safety and health at the study power generation plant. These were used to identify and recommend control measures which included engineering and administrative aspects as well as the use of personal protective equipment (PPE). A total of forty-one important hazard items were identified in the system at target power generation plant. These hazards were mainly identified by means of checklists which were sourced from literature and subsequently customized for the current purpose. Risk assessment was conducted by initially classifying the hazards into three levels such as Low, Medium and High. Generally 66% of the hazards identified were at low risk, 32% at medium and 2% at high risk. This indicated that there was sufficient awareness and commitment to safety and health at the study power station. Meanwhile the Power Station was also certified by MS 1722:2005, OHSAS 18001, MS ISO 14001:2004, MS ISO 9001:2000 and scheduled waste regulation 2005 which give credibility to the current study in creating a working model which may find widespread application in the future.

A.M. Saedi; J.J. Thambirajah; Agamuthu Pariatamby

2014-01-01T23:59:59.000Z

260

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Radiosonde Temperature Sensor Benefits from Stronger Structure Bookmark and Share The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. Small sensor packages called radiosondes (or "sondes") are used to transmit atmospheric information from weather balloons as they rise through the air. Vaisala, the supplier of sondes used at all the ARM sites, has introduced

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 15, 2008 [Facility News] September 15, 2008 [Facility News] Global Earth Observations Portal Provides Gateway to ARM Data Bookmark and Share The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. Data obtained at the ARM sites are freely available to users worldwide through the ARM Data Archive. In August, ARM added another entry point to its data collection by registering the ARM Program and Data Archive as

262

Facility Safety  

Directives, Delegations, and Requirements

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. Cancels DOE 5480.7A, DOE 5480.24, DOE 5480.28 and Division 13 of DOE 6430.1A. Canceled by DOE O 420.1A.

1995-10-13T23:59:59.000Z

263

Facility Safety  

Directives, Delegations, and Requirements

The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. Cancels DOE O 420.1B, DOE G 420.1-2 and DOE G 420.1-3.

2012-12-04T23:59:59.000Z

264

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

265

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

266

Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.  

SciTech Connect

The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

Martin, Robert C.; Mehrhoff, L.A.

1985-01-01T23:59:59.000Z

267

NREL: Energy Systems Integration Facility - Facility Design  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Design Throughout the Energy Systems Integration Facility design process, the National Renewable Energy Laboratory hosted workshops in which stakeholders from across the...

268

Deregulation and environmental differentiation in the electric utility industry  

E-Print Network (OSTI)

data on two types of renewables (hydroelectric facilitiesand non-hydroelectric facilities) for utilities in each ofdifference for hydroelectric facilities. However, for those

Delmas, M; Russo, M V; Montes-Sancho, M J

2007-01-01T23:59:59.000Z

269

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Improved Radiosonde Sensor Ready for Launch Improved Radiosonde Sensor Ready for Launch Bookmark and Share At the end of a string tied to the weather balloon, a small sensor package, called a radiosonde, contains the "brains" for measuring atmospheric temperature, pressure and humidity. At the end of a string tied to the weather balloon, a small sensor package, called a radiosonde, contains the "brains" for measuring atmospheric temperature, pressure and humidity. As part of the Balloon Borne Sounding System, radiosondes launched at the the ARM Climate Research Facility sites are supplied by Vaisala, one of the market leaders of this technology. Vaisala began phasing out production of the RS90 radiosondes at the end of calendar year 2004 in favor of their new RS92 model. The new version has an improved global positioning system

270

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] Improved Instrument Calibration Capabilities Benefit All Sites, Users Bookmark and Share To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. The ARM fills a unique position in the scientific community by obtaining

271

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] New Operations Status System Improves Tracking, Reporting Bookmark and Share Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. With heavily instrumented research sites around the globe, the ARM faces a daunting operations and reporting challenge. To better track and report the status of the capabilities at these widely disbursed sites, ARM operations staff recently completed the development of a comprehensive Operations Status System (OSS). By serving as a central collection point for all ARM

272

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 25, 2010 [Facility News] October 25, 2010 [Facility News] Testing Underway for New Doppler Lidars Bookmark and Share Two of the three new Doppler lidars are shown here during testing at the Southern Great Plains site in October. Two of the three new Doppler lidars are shown here during testing at the Southern Great Plains site in October. To improve climate models, the scientific community needs accurate and routine measurements of atmospheric winds with high vertical and temporal resolution under clear-air conditions. In particular, measurements of clear-air vertical air velocities will compliment in-cloud vertical velocity measurements from existing 35 and 95 gigahertz ARM cloud radars. In response to this need, three new Doppler lidars were purchased with funds from the American Recovery and Reinvestment Act and began a test

273

A novel KICAPCA fault detection model for condition process of hydroelectric generating unit  

Science Journals Connector (OSTI)

Abstract Fault detection and diagnosis of hydroelectric generating unit (HGU) have significant importance to the security of hydropower plant and the power system. In recent years, many fault detection methods based on spectral characteristic of vibration signals have been published. However, some faults cannot be effectively recognized just with spectral features for condition process monitoring of HGU. Thus, this study presents a novel fault detection model based on kernel independent component analysis and principal component analysis (KICAPCA) monitoring model for condition process of HGU. Each of the condition processes is equivalent to a multivariate statistical process monitoring (MSPM). KICAPCA model of the specific MSPM is trained by normal condition process data at first. Then, confidence limits of two monitoring indices (Hotellings T2 statistic and SPE statistic) of the trained KICAPCA model are used to monitor the same condition process and detect fault online. Moreover, the proposed monitoring model is applied to a real condition process of HGU. Compared to ICAPCA and PCA monitoring model, the proposed model has superior performance in fault detection.

Wenlong Zhu; Jianzhong Zhou; Xin Xia; Chaoshun Li; Jian Xiao; Han Xiao; Xinxin Zhang

2014-01-01T23:59:59.000Z

274

Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report  

SciTech Connect

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

NONE

1998-08-01T23:59:59.000Z

275

Hydroelectric power plant management relying on neural networks and expert system integration  

Science Journals Connector (OSTI)

The use of Neural Networks (NN) is a novel approach that can help in taking decisions when integrated in a more general system, in particular with expert systems. In this paper, an architecture for the management of hydroelectric power plants is introduced. This relies on monitoring a large number of signals, representing the technical parameters of the real plant. The general architecture is composed of an Expert System and two NN modules: Acoustic Prediction (NNAP) and Predictive Maintenance (NNPM). The NNAP is based on Kohonen Learning Vector Quantization (LVQ) Networks in order to distinguish the sounds emitted by electricity-generating machine groups. The NNPM uses an ART-MAP to identify different situations from the plant state variables, in order to prevent future malfunctions. In addition, a special process to generate a complete training set has been designed for the ART-MAP module. This process has been developed to deal with the absence of data about abnormal plant situations, and is based on neural nets trained with the backpropagation algorithm.

J.M. Molina; P. Isasi; A. Berlanga; A. Sanchis

2000-01-01T23:59:59.000Z

276

Life cycle assessment of a community hydroelectric power system in rural Thailand  

Science Journals Connector (OSTI)

Rural electrification and the provision of low cost, low emission technology in developing countries require decision makers to be well informed on the costs, appropriateness and environmental credentials of all available options. While cost and appropriateness are often shaped by observable local considerations, environmental considerations are increasingly influenced by global concerns which are more difficult to identify and convey to all stakeholders. Life cycle assessment is an iterative process used to analyse a product or system. This study iteratively applies life cycle assessment (LCA) to a 3kW community hydroelectric system located in Huai Kra Thing (HKT) village in rural Thailand. The cradle to grave analysis models the hydropower schemes construction, operation and end of life phases over a period of twenty years and includes all relevant equipment, materials and transportation. The study results in the enumeration of the environmental credentials of the HKT hydropower system and highlights the need to place environmental performance, and LCA itself, in a proper context. In the broadest sense, LCA results for the HKT hydropower system are found to reflect a common trend reported in hydropower LCA literature, namely that smaller hydropower systems have a greater environmentally impact per kWh perform less well environmentally - than larger systems. Placed within a rural electrification context, however, the HKT hydropower system yields better environmental and financial outcomes than diesel generator and grid connection alternatives.

Andrew Pascale; Tania Urmee; Andrew Moore

2011-01-01T23:59:59.000Z

277

Observations of Velocity Conditions near a Hydroelectric Turbine Draft Tube Exit using ADCP Measurements  

SciTech Connect

Measurement of flow characteristics near hydraulic structures is an ongoing challenge because of the need to obtain rapid measurements of time-varying velocity over a relatively large spatial domain. This paper discusses use of an acoustic Doppler current profiler (ADCP) to measure the rapidly diverging flow exiting from an operating hydroelectric turbine draft tube exit. The resolved three-dimensional velocity vectors show a highly complex and helical flow pattern developed near to and downstream of the exit. Velocity vectors were integrated across the exit and we computed an uneven percentage of flow (67%/33%) passing through the two draft tube barrels at a mid-range turbine discharge, consistent with physical model results. In addition to the three-dimensional velocity vectors, the individual one-dimensional velocities measured by each of the four ADCP beams can be separately used as calibration and validation datasets for numerical and physical models. This technique is demonstrated by comparing along-beam ADCP velocity measurements to data collected in a scaled physical model.

Cook, Christopher B.; Richmond, Marshall C.; Serkowski, John A.

2007-10-01T23:59:59.000Z

278

Development of an HTS hydroelectric power generator for the hirschaid power station  

Science Journals Connector (OSTI)

This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

Ruben Fair; Clive Lewis; Joseph Eugene; Martin Ingles

2010-01-01T23:59:59.000Z

279

4858 recreation facility [n  

Science Journals Connector (OSTI)

plan. recr. (Installation and equipment provided for recreation; ? simply-provided recreation facility , ? well-provided recreation facility ...

2010-01-01T23:59:59.000Z

280

Facilities | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Research Facility Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Tribology Laboratory Transportation Beamline at the Advanced...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Greening Federal Facilities: An Energy, Environmental, and Economic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greening Federal Facilities: An Energy, Environmental, and Economic Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition A nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition More Documents & Publications From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet) Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure)

282

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

063-2011 063-2011 February 2011 Superseding DOE-STD-1063-2006 April 2006 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2011 ii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/ns/techstds/ DOE-STD-1063-2011 iii FOREWORD 1. This Department of Energy (DOE) standard is approved for use by all DOE/National Nuclear Security Administration (NNSA) Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations,

283

Facility Type!  

Office of Legacy Management (LM)

ITY: ITY: --&L~ ----------- srct-r~ -----------~------~------- if yee, date contacted ------------- cl Facility Type! i I 0 Theoretical Studies Cl Sample 84 Analysis ] Production 1 Diepasal/Storage 'YPE OF CONTRACT .--------------- 1 Prime J Subcontract&- 1 Purchase Order rl i '1 ! Other information (i.e., ---------~---~--~-------- :ontrait/Pirchaee Order # , I C -qXlJ- --~-------~~-------~~~~~~ I I ~~~---~~~~~~~T~~~ FONTRACTING PERIODi IWNERSHIP: ,I 1 AECIMED AECMED GOVT GOUT &NTtiAC+OR GUN-I OWNED ----- LEEE!? M!s LE!Ps2 -LdJG?- ---L .ANDS ILJILDINGS X2UIPilENT IRE OR RAW HA-I-L :INAL PRODUCT IASTE Z. RESIDUE I I kility l pt I ,-- 7- ,+- &!d,, ' IN&"E~:EW AT SITE -' ---------------- , . Control 0 AEC/tlED managed operations

284

Research Facility,  

NLE Websites -- All DOE Office Websites (Extended Search)

Collecting and Delivering the Data Collecting and Delivering the Data As a general condition for use of the ARM Climate Research Facility, users are required to include their data in the ARM Data Archive. All data acquired must be of sufficient quality to be useful and must be documented such that users will be able to clearly understand the meaning and organization of the data. Final, quality-assured data sets are stored in the Data Archive and are freely accessible to the general scientific community. Preliminary data may be shared among field campaign participants during and shortly following the campaign. To facilitate sharing of preliminary data, the ARM Data Archive establishes restricted access capability, limited to participants and data managers.

285

ARM Mobile Facility (AMF2)  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Mobile Facility (AMF2) ARM Mobile Facility (AMF2) The ARM Mobile Facility (AMF2) is a durable, oceangoing mobile climate observatory. In 2008, the second ARM Mobile Facility (AMF2) was developed to extend the capabilities of the original AMF (AMF1) deployed in 2005. The AMF2 is portable, modular, and suited for operations on oceangoing ships and in harsh environments. The AMF2 has improved data flow and communications (primarily wireless) and optimized operating procedures. AMF2 instrument capabilities include standard meteorological instrumentation, a broadband and spectral radiometer suite, and remote sensing instruments. This instrumentation provides researchers with data from climate regimes not previously explored. The AMF2 also has available space, power, and data processing capabilities for additional instruments

286

Harrisburg Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Harrisburg Facility Biomass Facility Harrisburg Facility Biomass Facility Jump to: navigation, search Name Harrisburg Facility Biomass Facility Facility Harrisburg Facility Sector Biomass Facility Type Landfill Gas Location Dauphin County, Pennsylvania Coordinates 40.2734277°, -76.7336521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2734277,"lon":-76.7336521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

Brookhaven Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brookhaven Facility Biomass Facility Brookhaven Facility Biomass Facility Jump to: navigation, search Name Brookhaven Facility Biomass Facility Facility Brookhaven Facility Sector Biomass Facility Type Landfill Gas Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

Images of energy: Policy perspectives on the introduction of hydroelectricity in Italy, 1882-1914  

SciTech Connect

This study considers the link between energy technologies and cultural attitudes. Contemporary energy policy makers lack the conceptual tools with which to evaluate culturally appropriate energy choices. A way to regain a contextual capability is needed; that is, the capacity to recognize and avert situations where technological advance is insufficiently harmonized with its embedding environment. This study explores how both policy makers and the general public form their [open quotes]images of energy.[close quotes] It does so in three parts, beginning with an examination of the concepts of [open quotes]technology,[close quotes] [open quotes]culture[close quotes] and [open quotes]cognitive map,[close quotes] and an explanation of their interrelationship. The second part presents two historical case-studies of the introduction of hydroelectricity in Italy from 1882-1914. It considers how a relatively unknown technology made its way into urban and rural life, who its primary surveyors were, and how it shaped and was shaped by the cognitive maps of those into whose lives it marched. The final part extends the investigation to contemporary socio-cultural dynamics. Through concepts derived from General System Theory, the process of technological integration is interpreted in light of events that shape the world today. The design of a model to be used by energy makers and educators alike in conceiving culturally attuned energy alternatives is proposed. Such a model would describe energy-related cognitive maps and could serve as the basis for informed decision-making on energy choice at all levels of society. The study concludes with suggestions for a research agenda to further explore individual and collective energy-related cognitive maps.

Laszlo, A.R.

1992-01-01T23:59:59.000Z

289

Portland Company to Receive $1.3 Million to Improve Hydro Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Company to Receive $1.3 Million to Improve Hydro Power Portland Company to Receive $1.3 Million to Improve Hydro Power Technologies Portland Company to Receive $1.3 Million to Improve Hydro Power Technologies September 15, 2009 - 12:00am Addthis Washington, DC - US Energy Secretary Steven Chu today awarded more than $1.3 million to Ocean Renewable Power Company in Portland, Maine to improve the efficiency, flexibility, and environmental performance of hydroelectric energy. The investment will further the nation's supply of domestic clean hydroelectricity through technological innovation and will advance research to maximize the nation's largest renewable energy source. "Hydropower is our largest source of renewable energy and it can play an even bigger role in the further. These investments will create jobs, cut

290

International Facility Management Association Strategic Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Management Association Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning © 2009 | International Facility Management Association For additional information, contact: 1 e. Greenway Plaza, Suite 1100 houston, tX 77046-0104 USA P: + 1-713-623-4362 F: + 1-713-623-6124 www.ifma.org taBle OF cOntentS PreFace ......................................................... 2 executive Summary .................................... 3 Overview ....................................................... 4 DeFinitiOn OF Strategic Facility Planning within the Overall cOntext OF Facility Planning ................. 5 SPecializeD analySeS ................................ 9 OrganizatiOnal aPPrOacheS tO SFP ... 10 the SFP PrOceSS .......................................

291

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

292

"1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353  

U.S. Energy Information Administration (EIA) Indexed Site

York" York" "1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353 "2. Ravenswood","Gas","TC Ravenswood LLC",2330 "3. Nine Mile Point Nuclear Station","Nuclear","Nine Mile Point Nuclear Sta LLC",1773 "4. Oswego Harbor Power","Petroleum","NRG Oswego Harbor Power Operations Inc",1648 "5. Northport","Gas","National Grid Generation LLC",1569 "6. Astoria Generating Station","Gas","U S Power Generating Company LLC",1315 "7. Roseton Generating Station","Gas","Dynegy Northeast Gen Inc",1212 "8. Blenheim Gilboa","Pumped Storage","New York Power Authority",1160

293

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2011 Facility News ARM Mobile Facility Completes Extended Campaign in the Azores; Next Stop-India Bookmark and Share The ARM Mobile Facility obtained data on Graciosa...

294

Facilities Services Overview & Discussion  

E-Print Network (OSTI)

& Finance Facilities Services Director: Jeff Butler Human Resources Administrative Services Engineering) Environmental Services Morrison (3) Admin Services Evans (1) Human Resources Engineering (4) ·EngineeringFacilities Services Overview & Discussion Jeff Butler Director ­ Facilities Services November 2011

Maxwell, Bruce D.

295

1Q CY2012 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2012 (PDF), Facility Representative Program Performance 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were gathered by Field elements per Department of Energy (DOE) Technical Standarf 1063-2011, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for January-March 2012 More Documents & Publications 1Q CY2011 (PDF), Facility Representative Program Performance Indicators

296

3Q CY2011 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2011 (PDF), Facility Representative Program Performance 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July through September 2011. Data for these indicators were gathered by Field Elements per Department of Energy's (DOE) Technical Standard (STD) 1063-2011, Facility Representatives, and reported to Headquarters Program Offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for July - September 2011 More Documents & Publications 3Q CY2010 (PDF), Facility Representative Program Performance Indicators

297

Fuel Fabrication Facility  

National Nuclear Security Administration (NNSA)

Construction of the Mixed Oxide Fuel Fabrication Facility Construction of the Mixed Oxide Fuel Fabrication Facility November 2005 May 2007 June 2008 May 2012...

298

Sandia National Laboratories: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Center in Vermont Achieves Milestone Installation On September 23, 2014, in Concentrating Solar Power, Energy, Facilities, National Solar Thermal Test Facility, News, News &...

299

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2008 Facility News ARM Mobile Facility Completes Field Campaign in Germany Bookmark and Share Researchers will study severe precipitation events that occurred in...

300

from Isotope Production Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Cancer-fighting treatment gets boost from Isotope Production Facility April 13, 2012 Isotope Production Facility produces cancer-fighting actinium 2:32 Isotope cancer treatment...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Programs & User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Programs & User Facilities Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy...

302

Facility Data Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Data Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Facility Data Policy Career Opportunities...

303

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

approximately 22,500 square kilometers, or the approximate area of a modern climate model grid cell. Centered around the SGP Central Facility, these extended facilities are...

304

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

From Coastal Clouds to Desert Dust: ARM Mobile Facility Headed to Africa Bookmark and Share ARM operations staff prepare the ARM Mobile Facility in Point Reyes, California, for...

305

Nuclear Facilities | Department of Energy  

Energy Savers (EERE)

Nuclear Facilities Nuclear Facilities Nuclear Facilities Locator Map Numerical map data points indicate two or more nuclear facilities in the same geographic location. Nuclear...

306

Facility Representative Program: 2003 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Facility Representative Workshop 3 Facility Representative Workshop May 13 - 15, 2003 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 13, 2003 Theme: Program Successes and Challenges 8:00 a.m. John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathleen Carlson Manager, Nevada Site Office 8:30 a.m. Keynote Address Savannah River Site and Facility Reps - A Shared History and Common Future Jeffrey M. Allison Manager, Savannah River Operations Office 9:00 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board

307

NREL: Research Facilities - Test and User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and User Facilities Test and User Facilities NREL has test and user facilities available to industry and other organizations for researching, developing, and evaluating renewable energy and energy efficiency technologies. Here you'll find an alphabetical listing and brief descriptions of NREL's test and user facilities. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A Advanced Research Turbines At our wind testing facilities, we have turbines available to test new control schemes and equipment for reducing loads on wind turbine components. Learn more about the Advanced Research Turbines on our Wind Research website. Back to Top D Distributed Energy Resources Test Facility This facility was designed to assist the distributed power industry in the

308

Facility Representative Program: 2000 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Facility Representative Workshop 0 Facility Representative Workshop May 16-18, 2000 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Tuesday, May 16, 2000 Theme for Day 1: Sustaining the Success of the Facility Representative Program 8:00 a.m. - Opening Remarks - Joe Arango, Facility Representative Program Manager 8:05 a.m. - Welcome - Kenneth Powers, Deputy Manager Nevada Operations Office 8:15 a.m. - Deputy Secretary Remarks - T. J. Glauthier, Deputy Secretary of Energy 8:30 a.m. - Keynote Address - Jerry Lyle, Assistant Manager for Environmental Management, Idaho Operations Office 9:00 a.m. - Facility Representative of the Year Presentation - Mark B. Whitaker, Departmental Representative 9:30 a.m. - Break 9:50 a.m. - Program Results and Goals - Joe Arango, Facility Representative Program Manager

309

Refractory Improvement  

NLE Websites -- All DOE Office Websites (Extended Search)

Refractory Improvement Refractory Improvement NETL Office of Research and Development Project Number: FWP-2012.03.03 Task 2 Project Description Industry would like gasifier on-line availability of 85-95% for utility applications and 95% for applications such as chemical production. Gasification facilities' are currently unable to meet these requirements, which have created a potential roadblock to widespread acceptance and commercialization of gasification technologies. Refractory liners and syngas coolers are among key components of the gasification process previously identified as negatively impacting gasifier availability. Ash originating from impurities in the gasifier's carbon feedstock is the root cause of many problems impacting gasifier RAM (Reliability Availability Maintainability). At the high temperatures of gasification, ash changes to liquid, gas, and solid phases which wear down refractory materials and can cause fouling, either of which can lead to unplanned shutdowns for system repair, replacement, or cleaning.

310

Commissioning for Federal Facilities  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities.

311

Facility Representative Program: 2010 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Facility Representative Workshop 10 Facility Representative Workshop May 12 - 13, 2010 Las Vegas, NV Facility Rep of the Year Award | Attendees | Summary Report Workshop Agenda and Presentations Day 1: Wednesday, May 12, 2010 8:00 a.m. Opening Remarks James Heffner, Facility Representative Program Manager Earl Hughes, Safety System Oversight Program Manager Office of Nuclear Safety Policy and Assistance Office of Health, Safety and Security 8:15 a.m. Welcome from the Nevada Site Office John Mallin, Deputy Assistant Manager for Site Operations Nevada Site Office 8:30 a.m. Workshop Keynote Address Todd Lapointe Chief of Nuclear Safety Central Technical Authority Staff 9:15 a.m. Facility Representative and Safety System Oversight Award Ceremony James Heffner, Facility Representative Program Manager

312

Facility Representative Program: 2007 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Facility Representative Workshop 7 Facility Representative Workshop May 15 - 17, 2007 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 15, 2007 8:00 a.m. Opening Remarks Joanne Lorence, Facility Representative Program Manager 8:15 a.m. Welcome from the Nevada Site Office Gerald Talbot, Manager, Nevada Site Office 8:30 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:45 a.m. Keynote Address - Safety Oversight Perspective and Expectations Glenn Podonsky, Chief Health, Safety and Security Officer, Office of Health, Safety and Security 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board,

313

Facility Representative Program: 2001 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Facility Representative Workshop 1 Facility Representative Workshop May 15 - 17, 2001 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 15, 2001 Theme: Program Successes and Challenges 8:00 a.m. - Logistics Announcements & Opening Remarks - Joe Arango, Facility Representative Program Manager 8:15 a.m. - Welcome - Debbie Monette, Assistant Manager for National Security, Nevada Operations Office 8:30 a.m. - Keynote Address - Ralph Erickson, National Nuclear Security Administration 9:00 a.m.- DOE Facility Representative of the Year Presentation - Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board 9:30 a.m. - Break 9:50 a.m. - Program Summary - Joe Arango 10:10 a.m. - Management Panel/Questions and Answers

314

Effective Renewable Energy Policy: Leave It to the States?  

E-Print Network (OSTI)

geothermal heat, small hydroelectric facilities, biomass,batteries, compressed air, hydroelectric pumped storage,existing large-scale hydroelectric dams, and some allowing

Weissman, Steven

2011-01-01T23:59:59.000Z

315

RELIABILITY PLANNING IN DISTRIBUTED ELECTRIC ENERGY SYSTEMS  

E-Print Network (OSTI)

applied to the case of hydroelectric facilities with large3. For comparison, the hydroelectric system in California asas droughts which reduce hydroelectric energy availability,

Kahn, E.

2011-01-01T23:59:59.000Z

316

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network (OSTI)

Retirement of Dams and Hydroelectric Facilities. ASCE, Newon the Allier River, a hydroelectric plant in France. Thethe dam generating hydroelectric power versus the ecological

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

317

Potential for the Use of Energy Savings Performance Contracts to Reduce Energy Consumption and Provide Energy and Cost Savings in Non-Building Applications  

E-Print Network (OSTI)

generation at federal hydroelectric facilities.The majorityof federal hydroelectric dams are operated by the Army Corpsdesign life of 35 years. Hydroelectric turbine and generator

Williams, Charles

2014-01-01T23:59:59.000Z

318

NREL: Hydrogen and Fuel Cells Research - Other Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Other Research Facilities Other Research Facilities In addition to the laboratories dedicated to hydrogen and fuel cell research, other facilities at NREL provide space for scientists developing hydrogen and fuel cell technologies along with other renewable energy technologies. Distributed Energy Resources Test Facility NREL's Distributed Energy Resources (DER) Test Facility is a working laboratory to test and improve interconnections among renewable energy generation technologies, energy storage systems, and electrical conversion equipment. Research being conducted includes improving the system efficiency of hydrogen production by electrolysis using wind or other renewable energy. This research highlights a promising option for encouraging higher penetrations of renewable energy generation as well as

319

NREL: Photovoltaics Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL's world-class research facilities provide the venue for innovative advances in photovoltaic technologies and applications. These facilities within the National Center for Photovoltaics (NCPV) serve both multi-use and dedicated-use functions. We encourage our research colleagues in industry, universities, and other laboratories to pursue opportunities in working with our staff in these facilities. Dedicated-Use Facilities Photo of a red-hot coil glowing inside a round machine. Research within these facilities focuses on targeted areas of interest that require specific tools, techniques, or unique capabilities. Our two main dedicated-use facilities are the following: Outdoor Test Facility (OTF) OTF researchers study and evaluate advanced or emerging PV technologies

320

CRAD, Facility Safety- Nuclear Facility Safety Basis  

Energy.gov (U.S. Department of Energy (DOE))

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis.

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

User Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

USER PORTAL USER PORTAL BTRICBuilding Technologies Research Integration Center CNMSCenter for Nanophase Materials Sciences CSMBCenter for Structural Molecular Biology CFTFCarbon Fiber Technology Facility HFIRHigh Flux Isotope Reactor MDF Manufacturing Demonstration Facility NTRCNational Transportation Research Center OLCFOak Ridge Leadership Computing Facility SNSSpallation Neutron Source Keeping it fresh at the Spallation Neutron Source Nanophase material sciences' nanotech toolbox Home | User Facilities SHARE ORNL User Facilities ORNL is home to a number of highly sophisticated experimental user facilities that provide unmatched capabilities to the broader scientific community, including a growing user community from universities, industry, and other laboratories research institutions, as well as to ORNL

322

Facility Representative Program: Facility Representative Program Sponsors  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program Sponsors Facility Representative Program Sponsors There are 29 Facility Representative Program Sponsors Office Name Title E-Mail Phone ASO Larry Pendexter ES&H Div Dir (Argonne) larry.pendexter@ch.doe.gov 630-252-1485 BHSO Bob Desmarais Operations Management Division Director desmarai@bnl.gov 631-344-5434 CBFO Glenn Gamlin Facility Representative Supervisor glenn.gamlin@wipp.ws 575-234-8136 CBFO Casey Gadbury Operations Manager casey.gadbury@wipp.ws 575-234-7372 FSO Mark Bollinger Deputy Manager Mark.Bollinger@ch.doe.gov 630-840-8130 FSO John Scott FR Team Lead john.scott@ch.doe.gov 630-840-2250 HS-30 James O'Brien Director, Office of Nuclear Safety James.O'Brien@hq.doe.gov 301-903-1408 HS-32 Earl Hughes Facility Representative Program Manager Earl.Hughes@hq.doe.gov 202-586-0065

323

3Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2003 (PDF), Facility Representative Program Performance 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from July to September 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. 3Q CY2003, Facility Representative Program Performance Indicators More Documents & Publications 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2005 (PDF), Facility Representative Program Performance Indicators

324

NREL: Wind Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Our facilities are designed to meet the wind industry's critical research needs with state-of-the-art design and testing facilities. NREL's unique and highly versatile facilities at the National Wind Technology Center offer research and analysis of wind turbine components and prototypes rated from 400 watts to 3 megawatts. Satellite facilities support the growth of wind energy development across the United States. National Wind Technology Center Facilities Our facilities are contained within a 305-acre area that comprises field test sites, test laboratories, industrial high-bay work areas, machine shops, electronics and instrumentation laboratories, and office areas. In addition, there are hundreds of test articles and supporting components such as turbines, meteorological towers, custom test apparatus, test sheds,

325

FACET User Facility  

NLE Websites -- All DOE Office Websites

AD SLACPortal > Accelerator Research Division > FACET User Facility AD SLACPortal > Accelerator Research Division > FACET User Facility Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content

326

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2005 [Facility News] October 15, 2005 [Facility News] Room to Share-New Guest Facility Ready for Users at North Slope of Alaska Bookmark and Share In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. To alleviate crowded conditions at its research facilities on the North Slope of Alaska (NSA) site in Barrow, ARM operations staff recently completed the installation of a new Guest Instrument Facility. Similar to the platform at the Atqasuk site, the facility consists of two insulated shipping containers mounted on pilings, with a mezzanine to accommodate

327

Jupiter Laser Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Jupiter Laser Facility The commissioning of the Titan Petawatt-Class laser to LLNL's Jupiter Laser Facility (JLF) has provided a unique platform for the use of petawatt (PW)-class...

328

Facilities | Jefferson Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

JLab Buildings Facilities Management & Logistics is responsible for performing or specifying performance of all Jefferson Lab facility maintenance. A D D I T I O N A L L I N K S:...

329

The digital preservation facility  

Science Journals Connector (OSTI)

Critical listening should be an essential part of all archiving and restoration facilities quality control. We review the priorities and requirements for listening spaces ranging from the individual collector and small community archives to large?scale facilities. Examples discussed include the Library of Congress Culpepper facility university libraries and commercial facilities. Adapting listening rooms to the requirements of n?channel audio are discussed. Public recommendations of the Sound Preservation Board of the Library of Congress will be reviewed.

2006-01-01T23:59:59.000Z

330

Sandia National Laboratories: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

DETL, Energy, Facilities, Materials Science, News, News & Events, Photovoltaic, Renewable Energy, Research & Capabilities, Solar, Solar Newsletter, Systems Analysis Sandia...

331

ORAU South Campus Facility  

Energy.gov (U.S. Department of Energy (DOE))

This document explains the cleanup activities and any use limitations for the land surrounding the ORAU South Campus Facility.

332

DOE Designated Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Argonne Wakefield Accelerator (AWA) Argonne Tandem Linac Accelerator System (ATLAS) Center for Nanoscale Materials Leadership Computing Facility* Brookhaven National...

333

NREL: Research Facilities - Working with Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Us Working with Us For developing commercially viable energy products, organizations may partner with NREL to use our state-of-the-art laboratories, testing and user facilities. We typically develop technology partnership agreements for using our facilities and/or working with our researchers. Learn more about technology partnership agreements on the NREL Technology Transfer Web site. Printable Version Research Facilities Home Laboratories Test & User Facilities Laboratories & Facilities by Technology Working with Us Did you find what you needed? Yes 1 No 0 Thank you for your feedback. Would you like to take a moment to tell us how we can improve this page? Submit We value your feedback. Thanks! We've received your feedback. Something went wrong. Please try again later.

334

Status report: The Groningen AMS facility  

Science Journals Connector (OSTI)

The Groningen AMS facility has been in operation since 1994. The AMS is based on a 2.5 MV tandetron accelerator. It is an automatic mass spectrometer, dedicated to 14C analysis. Thus far, a grand total of about 16000 14C targets have been measured. We report here on the status and performance of the facility, technical improvements and a precision study on atmospheric samples.

J van der Plicht; S Wijma; A.T Aerts; M.H Pertuisot; H.A.J Meijer

2000-01-01T23:59:59.000Z

335

Wheelabrator Bridgeport Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Bridgeport Biomass Facility Jump to: navigation, search Name Wheelabrator Bridgeport Biomass Facility Facility Wheelabrator Bridgeport Sector Biomass Facility Type...

336

Facility Representative Program: 2004 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Facility Representative Workshop 4 Facility Representative Workshop May 18 - 20, 2004 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 18, 2004 Theme: Program Successes and Challenges 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathy Carlson, Nevada Site Office Manager 8:30 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy Deputy Secretary's Remarks 8:40 a.m. Keynote Address - NNSA Evaluation of Columbia Accident Investigation Board Report Brigadier General Ronald J. Haeckel, Principal Assistant Deputy Administrator for Military Applications, NNSA Other Information: NASA’S Columbia Accident Investigation Board Report

337

Facility Representative Program: 2006 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Facility Representative Workshop 6 Facility Representative Workshop May 16 - 19, 2006 Knoxville, Tennessee Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final To view Pictures, scroll the mouse over the Picture icon To view Presentations, Picture Slideshows and Video, click on the icon Day 1: Tuesday, May 16, 2006 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome from Oak Ridge Office Gerald Boyd, Manager, Oak Ridge Office 8:25 a.m. Welcome from Y-12 Site Office Theodore Sherry, Manager, Y-12 Site Office 8:35 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:40 a.m. Keynote Address - Safety Oversight at Environmental Management Activities Dr. Inés Triay, Chief Operating Officer, Office of Environmental Management

338

NREL: Buildings Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL provides industry, government, and university researchers with access to state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency technologies and innovations. NREL engineers and researchers work closely with industry partners to research and develop advanced technologies. NREL's existing facilities have been used to test and develop many award-winning building technologies and innovations that deliver significant energy savings in buildings, and the new facilities further extend those capabilities. In addition, the NREL campus includes living laboratories, buildings that researchers and other NREL staff use every day. Researchers monitor real-time building performance data in these facilities to study energy use

339

Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309  

SciTech Connect

This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

Anderson, K.

2012-04-01T23:59:59.000Z

340

Facility Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser  

Open Energy Info (EERE)

Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate WindTurbineManufacturer FacilityStatus Coordinates D Metals D Metals D Metals Definition Small Scale Wind Valley City OH MW Northern Power Systems In Service AB Tehachapi Wind Farm AB Tehachapi Wind Farm AB Tehachapi Definition Commercial Scale Wind Coram Energy AB Energy Southern California Edison Co Tehachapi CA MW Vestas In Service AFCEE MMR Turbines AFCEE MMR Turbines AFCEE MMR Turbines Definition Commercial Scale Wind AFCEE Air Force Center for Engineering and the Environment Distributed generation net metered Camp Edwards Sandwich MA MW GE Energy In Service AG Land AG Land AG Land Definition Community Wind AG Land Energy LLC

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 22, 2007 [Facility News] March 22, 2007 [Facility News] GEWEX News Features Dust Data from ARM Mobile Facility Deployment Bookmark and Share Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. The February 2007 issue (Vol. 17, No. 1) of GEWEX News features early results from special observing periods of the African Monsoon Mutidisciplinary Analysis, including data obtained by the ARM Mobile Facility (AMF). The AMF was stationed in the central Sahel from January through December 2006, with the primary facility at the Niamey airport, and an ancillary site in Banizoumbou. The AMF recorded a major dust storm that passed through the area in March, and combined with simultaneous satellite

342

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 16, 2005 [Facility News] February 16, 2005 [Facility News] Mobile Facility Arrives Safe and Sound in Point Reyes Bookmark and Share Image - The ARM Mobile Facility in Point Reyes, California Image - The ARM Mobile Facility in Point Reyes, California Safe and sound at Point Reyes, the ARM Mobile Facility instrumentation is set up on the roof of a shelter until a fence is installed to keep out the curious local cattle. On February 9, the ARM Mobile Facility (AMF) withstood an accident on the way to its deployment location at Point Reyes, California. About an hour from its destination, the truck carrying the two AMF shelters packed with instrumentation and associated equipment swerved to avoid another vehicle and slid off the road and down a steep embankment. Emergency personnel soon

343

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2011 [Facility News] 22, 2011 [Facility News] Request for Proposals Now Open Bookmark and Share The ARM Climate Research Facility is now accepting applications for use of an ARM mobile facility (AMF), the ARM aerial facility (AAF), and fixed sites. Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Facility, with availability as follows: AMF2 available December 2013 AMF1 available March 2015 AAF available between June and October 2013 Fixed sites available FY2013 Priority will be given to proposals that make comprehensive use of the ARM facilities and focus on long-term goals of the DOE Office of Biological and Environmental Research. Successful proposals will be supplied all operational and logistical resources (provided at no cost to the principal

344

A practical design for an integrated HVDC unit - connected hydro-electric generating station  

SciTech Connect

To date, several authors (see reference list) have proclaimed benefits which can be achieved by integrating HVDC converter stations directly with generating units. The cost of a significant amount of plant and facilities found in conventional schemes is thereby eliminated. So far as is known however, no detailed studies have been done to quantify these benefits. This paper outlines the results of a study made recently by the Manitoba HVDC Research Centre to determine the practicality of such a scheme. To give credence to the results an actual hydro station design was used incorporating a HVDC thyristor valve scheme in a hypothetical situation. Financial and other benefits were determined for this example together with conclusions and recommendations for future specific projects and further areas of study.

Ingram, L. (Manitoba HVDC Research Centre, Winnipeg (CA))

1988-10-01T23:59:59.000Z

345

224-T Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

T Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T Facility 242-A Evaporator 300 Area 324...

346

Cold Test Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects & Facilities > Cold Test Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T...

347

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Pump Shelter Kicks Off Upgrades to Aerosol Observing System New Pump Shelter Kicks Off Upgrades to Aerosol Observing System Bookmark and Share Representing the first of several planned improvements to the Aerosol Observing System (AOS) at the SGP site, the ARM Climate Research Facility operations staff completed installing a new pump shelter for the system in late September, followed by relocation of the pumps and connection of the electrical hookups in October. Though the enclosure was designed primarily to move the nine vacuum pumps out of the existing AOS trailer-thereby reducing the potential for damage to the AOS instruments from heat generated by the pumps-noise reduction in the AOS trailer was another desired outcome. Anticipated instrument additions were also considered in designing the new enclosure. The new pump shelter sits on a concrete pad near the south end of the AOS. Four adjustable, open-wire shelves run the width of the shelter, and can accommodate sixteen large pumps and associated ventilation equipment.

348

2Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2003 (PDF), Facility Representative Program Performance 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from April to June 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. A total of 13 Facility Representatives transferred to other positions during the quarter. Five of these accepted Facility Representative positions at other sites. Of the 8 that left the Program. 1 recieved a promotion and 7 accepted lateral positions. All of

349

2Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2006 (PDF), Facility Representative Program Performance 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. 2Q CY2006, Facility Representative Program Performance Indicators More Documents & Publications 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2004 (PDF), Facility Representative Program Performance Indicators

350

4Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2003 (PDF), Facility Representative Program Performance 4Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from October to December 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. As of December 31,2003, 93% of all Facility Representatives were fully qualified, exceeding the DOE goal of 80%. Currently, 23 of 27 sites meet the goal of 80%. Currently, 23 of 27 sites meet the goal for Facility Representative

351

RMOTCTrainingFacilityNEW.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

* Field Laboratory with surface outcrops of Cretaceous fluvial and marine units * Gas Processing Facilities * Production Facilities * Tanks & Pipelines * Aquaculture &...

352

Pollution prevention opportunity assessments of US Army Corps of Engineers Civil Works Facilities  

SciTech Connect

This project summary describes three Pollution Prevention Opportunity Assessments conducted at US Army Corps of Engineers Civil Works facilities under the Waste Reduction Evaluations at Federal Sites (WREAFS) Program. The purposes of the WREAFS Program are to identify new technologies and techniques for reducing wastes from industrial processes at Federal sites, and to enhance the implementation of pollution prevention through technology transfer. New techniques and technologies for reducing waste generation are identified through pollution prevention opportunity assessments (PPOA) and may be further evaluated through joint research, development, and demonstration projects. The assessments were conducted using the procedures outlined in EPA`s Facility Pollution Prevention Guide. The assessments had two major phases. The first phase quantified waste generation and management practices. The second phase identified and evaluated the feasibility of opportunities and techniques to eliminate, reduce, or recycle wastes. The facilities studied in the PPOAs were: a navigation lock and dam; a warehouse and a maintenance and repair facility; a hydroelectric power plant; and a flood control dam and reservoir with associated public recreation areas. Other Federal agencies, such as the Bureau of Reclamation and the Tennessee Valley Authority have similar functions and facilities, as do states and the private sector. Thus, the results of the PPOAs described in the three full reports have applicability to a broad audience.

NONE

1995-08-01T23:59:59.000Z

353

Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Inteconnect (DOE/EIS-0372) (09/12/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Federal Register 6 Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices DEPARTMENT OF ENERGY [Docket No. PP-89-1] Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect AGENCY: Department of Energy. ACTION: Notice of public hearings. SUMMARY: The Department of Energy (DOE) announces two public hearings on the ''Draft Environmental Impact Statement for the Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect'' (DOE/EIS-0372). The Draft EIS was prepared pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended, 42 U.S.C. 4321 et seq., the Council on Environmental Quality NEPA regulations, 40 CFR parts 1500-1508, and the DOE NEPA regulations, 10 CFR part 1021. The U.S. Fish and Wildlife

354

South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.  

SciTech Connect

The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

United States. Bonneville Power Administration.

1992-07-01T23:59:59.000Z

355

3Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2006 (PDF), Facility Representative Program Performance 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 76% fully qualified 41% staffing level

356

4Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2006 (PDF), Facility Representative Program Performance 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 72% Fully Qualified ( last Quarter was

357

2Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2008 (PDF), Facility Representative Program Performance 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 87% Fully Qualifed ( last quarter was 85%) 86% Staffing Level ( last quarter was 88%)

358

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2009 [Facility News] July 31, 2009 [Facility News] President of the Regional Government Speaks at Opening Ceremony for Mobile Facility in the Azores Bookmark and Share Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. On June 30, officials from the Regional Government of the Azores recognized the deployment of the ARM Mobile Facility on Graciosa Island during an official opening ceremony held at the site. Notable among the participants

359

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2012 [Facility News] 6, 2012 [Facility News] News Tips from 2012 EGU General Assembly Bookmark and Share The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. VIENNA - The U.S. Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility is the world's most comprehensive outdoor laboratory and data archive for research related to atmospheric processes that affect Earth's climate. At the European Geophysical Union (EGU) General Assembly 2012 in Vienna, find out how scientists use the ARM Facility to study the interactions between clouds,

360

BNL | Accelerator Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Test Facility Accelerator Test Facility Home Core Capabilities Photoinjector S-Band Linac Laser Systems CO2 Laser Nd:Yag Laser Beamlines Beamline Simulation Data Beamline Parameters Beam Diagnostics Detectors Beam Schedule Operations Resources Fact Sheet (.pdf) Image Library Upgrade Proposal (.pdf) Publications ES&H Experiment Start-up ATF Handbook Laser Safety Collider-Accelerator Dept. C-AD ES&H Resources Staff Users' Place Apply for Access ATF photo ATF photo ATF photo ATF photo ATF photo A user facility for advanced accelerator research The Brookhaven Accelerator Test Facility (ATF) is a proposal driven, steering committee reviewed facility that provides users with high-brightness electron- and laser-beams. The ATF pioneered the concept of a user facility for studying complex properties of modern accelerators and

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2011 [Facility News, Publications] 8, 2011 [Facility News, Publications] Journal Special Issue Includes Mobile Facility Data from Germany Bookmark and Share The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. In 2007, the ARM Mobile Facility participated in one of the most ambitious field studies ever conducted in Europe-the Convective and Orographically Induced Precipitation Study (COPS). Now, 21 papers published in a special issue of the Quarterly Journal of the Royal Meteorological Society demonstrate that the data collected during COPS are providing new insight into: the key chemical and physical processes leading to convection initiation and to the modification of precipitation by orography;

362

WIPP - Public Reading Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Reading Facilities/Electronic Reading Facilities The Freedom of Information Act (FOIA) and Electronic FOIA (E-FOIA) require that various specific types of records, as well as various other records, be maintained in public reading facilities. Before you submit a FOIA request, we recommend you contact or visit the appropriate public reading facility to determine if the records you are seeking have already been released. The U.S. Department of Energy (DOE), as well as other related DOE sites, have established home pages on the Internet with links to other web sites. If you determine a specific facility might have records in which you are interested, requests for those records can be made directly to the public reading rooms identified below. Copying of records located in the public reading rooms must be made by the staff of those facilities.

363

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 7, 2011 [Facility News] April 7, 2011 [Facility News] Review Panel States ARM Facility "Without Peer" Bookmark and Share Every three years, DOE Office of Science user facilities undergo a review to evaluate their effectiveness in contributing to their respective science areas. The latest ARM Facility review was conducted in mid-February by a six-member review panel led by Minghua Zhang of Stony Brook University. Notably, in a debriefing following the review, the panel stated that ARM was a "world class facility without peer." The panel convened in Ponca City, Oklahoma, near ARM's Southern Great Plains site to conduct their review. Their first agenda item was an SGP site tour, which provided a realtime example of the scope and expertise of site operations and included a demonstration of the site's newly

364

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2010 [Facility News] 8, 2010 [Facility News] Europeans Keen to Hear About Effects of Dust Using Data from Africa Bookmark and Share In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. Researcher Xiaohong Liu from Pacific Northwest National Laboratory was

365

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Team Scouts Graciosa Island for 2009 Mobile Facility Deployment Site Bookmark and Share A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens Indications from a scouting trip by the ARM Mobile Facility (AMF) science and operations management team are that an excellent site for the 2009 deployment may have been found. From April 8 through April 16, the team traveled to Graciosa Island in the Azores to scout sites for the Clouds, Aerosol, and Precipitation in the Marine Boundary Layer (CAP-MBL) field

366

340 Facility compliance assessment  

SciTech Connect

This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility.

English, S.L. [Pacific Northwest Lab., Richland, WA (United States)

1993-10-01T23:59:59.000Z

367

Integrated Facilities Disposition Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Facilities Disposition Program Tank Waste Corporate Board Meeting at ORNL Sharon Robinson Dirk Van Hoesen Robert Jubin Brad Patton July 29, 2009 2 Managed by UT-Battelle for the U.S. Department of Energy The Integrated Facility Disposition Program (IFDP) addresses the remaining EM Scope at both ORNL and Y-12 Cost Range: $7 - $14B Schedule: 26 Years 3 Managed by UT-Battelle for the U.S. Department of Energy Scope of work * Treatment and disposition of legacy materials and waste * D&D 327 (1.5 M ft 2 ) excess facilities generating >2 M yd 3 debris * Soil and groundwater remedial actions generating >1 M yd 3 soils * Facilities surveillance and maintenance * Reconfiguration of waste management facilities * Ongoing waste management operations * Project management

368

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2013 [Facility News] 4, 2013 [Facility News] Work Cut Out for ARM Science Board Bookmark and Share With a new fixed site on the horizon in the Azores, a third ARM Mobile Facility gearing up for action in the Arctic, and more aircraft probes and sensors than scientists can shake a stick at, the ARM Facility continues to expand its considerable suite of assets for conducting climate research. Along with this impressive inventory comes the responsibility to ensure the Facility is supporting the highest-value science possible. Enter the ARM Science Board. This eleven-member group annually reviews complex proposals for use of the ARM mobile and aerial facilities. To maintain excellence and integrity in the review process, each member serves a renewable term of two years, with membership updated annually.

369

Spring-supported thrust bearings used in hydroelectric generators: Limit ofhydrodynamic lubrication  

Science Journals Connector (OSTI)

The fluid film breakdown in large spring-supported thrust bearings was examined experimentally for low rotor speeds. Under these conditions, the lubrication was hydrodynamic rather than thermohydrodynamic and thus, the limit of hydrodynamic lubrication was sought. A thrust bearing test facility was used to test three bearings with various loads, speeds, and lubricant viscosities. Power loss and oil temperatures were measured and, using elementary theory, these measured quantities were linked to friction and average fluid film thickness in the bearing. A dimensionless performance number was developed and correlated with the coefficient of friction based on the power loss measurements. The breakdown of fluid film lubrication at the limit of hydrodynamic lubrication was established for an average performance number. The accuracy of the experimental findings was explored by comparing the friction and film thickness calculated from the measurements with the predictions of a comprehensive software package. Some general agreement was obtained. The relationship between the lambda ratio and a modified performance number was also examined based on typical surface roughness measurements. Although the procedures developed did not provide a high level of precision, some clear insights were gained into the thrust bearing behaviour at the limit of hydrodynamic lubrication. In particular, a large spring-supported thrust bearing under a typical load with a common lubricant was shown to sustain predominantly hydrodynamic lubrication at rotational speeds as low as 10 rpm.

A.L. Brown; J.B. Medley; J.H. Ferguson

2000-01-01T23:59:59.000Z

370

Expansion of the 5 DE Noviembre hydroelectric project, El Salvador, C.A.  

SciTech Connect

With an area of 21,050 square kilometers, the Republic of El Salvador is the smallest country in Central American. El Salvador, independent since 1821, is a democratic country with its President elected by popular vote for a five-year term. The population in El Salvador was estimated at 5.1 million in 1992. Over the period of 1984 to 1993, the peak load of the Comision Ejecutiva Hidroelectrica del Rio Lempa (CEL) system, which serves about 98 percent of the country`s power needs, grew 6.5 percent per year. During the same period the energy generation increased at an annual rate of 6.8 percent. These growths were achieved in spite of the political turmoil and civil war that had gripped the country from 1980 to 1992. Since the end of the civil war, the country has witnessed significant economic recovery and growth. System demands will continue to increase at a rapid rate, due primarily to continued economic recovery and expansion resulting from establishment of the now political system. CEL generating facilities will be undergoing significant rehabilitation to correct the problems accumulated over the civil war period.

Fuerte, E.G.; Mendoza, V. [Comision Ejecutiva Hidroelectrica del Rio Lempa, San Salvador (El Salvador); Wang, L.L. [Harza Engineering Co., Chicago, IL (United States)] [and others

1995-12-31T23:59:59.000Z

371

Poultry Facility Biosecurity  

E-Print Network (OSTI)

of organic materials on tires and shoes. Design features should include a one-way traff_ic system for all poultry facilities. The system should route personnel, vehicles and poultry from youngest birds to oldest birds, from ?clean? areas to ?dirty? areas... from waterways used by migra - tory waterfowl. Locate new facilities as far as possible from roads handling high volumes of poultry vehicles such as feed trucks or live-haul vehicles. Poultry facilities also need adequate amounts of potable water...

Carey, John B.; Prochaska, J. Fred; Jeffrey, Joan S.

2005-12-21T23:59:59.000Z

372

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites

banner banner Home | People | Site Index Atmospheric Radiation Measurement Climate Research Facility US Department of Energy About Science Campaigns Sites Instruments Measurements Data News Publications Education Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings Propose a Campaign Submitting Proposals: Guidelines Featured Campaigns Campaign Data List of Campaigns Aerial Facility Eastern North Atlantic Mobile Facilities North Slope of Alaska Southern Great Plains Tropical Western Pacific Location Table Contacts Instrument Datastreams Value-Added Products PI Data Products Field Campaign Data Related Data

373

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

20, 2008 Facility News ARM Scientists Lead International Radiation Symposium in Brazil Bookmark and Share The ARM Science Team showed up in force at the 2008 International...

374

Sandia National Laboratories: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Sandian Presents on PV Failure Analysis at European PV Solar Energy Conference and Exhibition (EU PVSC) On December 15, 2014, in Computational Modeling & Simulation,...

375

Sandia National Laboratories: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Production Method Could Lead to Better Lights, Lenses, Solar Cells On July 1, 2014, in Capabilities, CINT, Energy, Energy Efficiency, Facilities, Materials Science,...

376

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 30, 2007 Facility News New Radar Wind Profiler Joins AMF Instrument Suite in Germany Bookmark and Share The 1290 MHz wind profiler (foreground) joins the eddy correlation...

377

ARM Mobile Facilities  

ScienceCinema (OSTI)

This video provides an overview of the ARM Mobile Facilities, two portable climate laboratories that can deploy anywhere in the world for campaigns of at least six months.

Orr, Brad; Coulter, Rich

2014-09-15T23:59:59.000Z

378

AMF ARM Mobile FAcility  

NLE Websites -- All DOE Office Websites (Extended Search)

AMF ARM Mobile FAcility Details on the AMF proposal process can be found at http:www.arm.govacrfsubmitproposals.stm. For more information, contact: Mark Miller Mary Jane...

379

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Facility News Field Campaigns Generate Interest from Aviation Aficionados in Oklahoma Bookmark and Share Dr. Pete Lamb On November 13, Dr. Pete Lamb attended a meeting of...

380

Lighting Test Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Custom Projects Lighting Test Facilities SSL Guidelines Industrial Federal Agriculture LED Street and Area Lighting Field Test of Exterior LED Down Lights Abstract Outdoor...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ARM Mobile Facilities  

SciTech Connect

This video provides an overview of the ARM Mobile Facilities, two portable climate laboratories that can deploy anywhere in the world for campaigns of at least six months.

Orr, Brad; Coulter, Rich

2010-12-13T23:59:59.000Z

382

Facility Survey & Transfer  

Energy.gov (U.S. Department of Energy (DOE))

As DOE facilities become excess, many that are radioactively and/or chemically contaminated will become candidate for transfer to DOE-EM for deactivation and decommissioning.

383

Neutron Scattering Facilities  

Science Journals Connector (OSTI)

The past history, present performance and future prospects for neutron scattering facilities will be discussed. Special features of neutron scattering techniques applicable to biological problems will be ... . Th...

D. L. Price

1996-01-01T23:59:59.000Z

384

Sandia National Laboratories: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2014, in DETL, Distribution Grid Integration, Energy, Energy Surety, Facilities, Grid Integration, Infrastructure Security, News, News & Events, Photovoltaic, Renewable...

385

Science and Technology Facility  

Office of Environmental Management (EM)

IBRF Project Lessons Learned Report Integrated Biorefinery Research Facility Lessons Learned - Stage I Acquisition through Stage II Construction Completion August 2011 This...

386

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities, and authorization checks for physical access. An integrated cyber security plan encompasses all aspects of computing. Cyber security plans are risk-based....

387

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

the website still features the familiar faces of Professor Polar Bear, Teacher Turtle, and PI Prairie Dog (each representing an ARM Climate Research Facility site), but now...

388

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

(left) and 2-channel (right) NFOV radiometers are collocated with the infrared thermometer (green stripe) at the SGP Central Facility. Numerous other instruments are situated...

389

Potential Economic Impacts of Zebra Mussels on the Hydropower Facilities in the Columbia River Basin  

E-Print Network (OSTI)

was to estimate costs to the Federal Columbia River Power System hydroelectric projects in the event of a zebra found that the one-time cost for installing zebra mussel control systems at hydroelectric projects could hypochlorite (NaOCl) injection system and anti-fouling paint), at 13 select hydroelectric projects, was $23

390

Analysis of environmental issues related to small-scale hydroelectric development. V. Instream flow needs for fishery resources  

NLE Websites -- All DOE Office Websites (Extended Search)

45b 45b 0554033 I . . ~ ...... . . . . . . . . _ . . _ ~ ~~ ~~ - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - . . . , O R N U T M - 7 8 6 1 Distribution Category UC-97e 0. W-7405-eng-26 ANALYSIS OF ENVIRO RELATED TO SMALL-SCALE HYDROELECTRIC DEVELOPMENT. V. INSTREAM FLOW NEE S FOR FISHERY RESOURCES James M. Loar Michael J. Sale TAL SCIENCES D r v r S - I o N Pub1 i c a t i on No. 1829 Prepared f o r U. S. Department o f Energy, A s s i s t a n t Secretary f o r Conservation and Renewable Energy, D i v i s i o n o f H y d r o e l e c t r i c Resource Development Date Pub1 i shed: October 1981 L Tennessee 37830 UNION CARBIDE ~ O ~ ~ ~ R A T I O N f o r the ENT OF ENERGY 3 445b 0554033 B ACKNOWLEDGMENTS W e thank W i l l i a m Knapp (1I.S. F i s h and W i l d l i f e Service, Region 5) and Mark Robinson (Federal Energy Regulatory Commission) for h

391

Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine  

SciTech Connect

The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

None,

1980-05-01T23:59:59.000Z

392

A Practical Approach to Energy Management in a Large Petrochemical Manufacturing Facility  

E-Print Network (OSTI)

The largest of Chevron Phillips Chemical Company's 34 chemical manufacturing facilities, the Cedar Bayou Plant located in Baytown, TX, undertook the task of creating a facility-wide energy management and improvement program in 2004. The Cedar Bayou...

Ackley, A.

2005-01-01T23:59:59.000Z

393

CX-000642: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Recovery Act: North Little Rock Hydroelectric Department Hydroelectric Facility Improvement Project: Automated Intake Clearing Equipment and Material; ManagementCX(s) Applied: A9Date: 01/28/2010Location(s): North Little Rock, ArkansasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

394

Science &Technology Facilities Council  

E-Print Network (OSTI)

and Science & Technology Facilities Council invite you to The ESA Technology Transfer Network SpaceTech2012Science &Technology Facilities Council Innovations Issue 31 October 2012 This issue: 1 STFC International prize for `no needles' breast cancer diagnosis technique 6 CEOI Challenge Workshop ­ Current

395

Nanotechnology User Facility for  

E-Print Network (OSTI)

A National Nanotechnology User Facility for Industry Academia Government #12;The National Institute of Commerce's nanotechnology user facility. The CNST enables innovation by providing rapid access to the tools new measurement and fabrication methods in response to national nanotechnology needs. www

396

Facilities Management CAD Standards  

E-Print Network (OSTI)

Facilities Management CAD Standards 2011 #12;Facilities Management CAD Standards Providing: Layering Standards 2.1 Layer Name Format 2.2 Layer Name Modifiers 2.3 Layer Attributes 2.4 Special Layer of PDF and DWG Files APPENDIX A: DAL FM CAD Standard Layers APPENDIX B: DAL FM CAD Special Layers

Brownstone, Rob

397

Cornell University Facilities Services  

E-Print Network (OSTI)

requirements, building code, and sustainability objectives. This plan takes a long- term view, projecting workCornell University Facilities Services Contract Colleges Facilities Fernow and Rice Hall in Fernow, Rice, Bruckner, Bradfield and Plant Science buildings. It includes a surging and phasing plan

Manning, Sturt

398

Emergency Facilities and Equipment  

Directives, Delegations, and Requirements

This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

399

Surveillance Guides - Continous Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTINUOUS IMPROVEMENT CONTINUOUS IMPROVEMENT 1.0 Objective The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues in a manner that fosters continuous improvement. The activities included in this surveillance help the Facility Representative determine whether safety issues identified through internal contractor, and external DOE or Defense Nuclear Facilities Safety Board evaluation programs are resolved consistent with the level of safety importance. 2.0 References 2.1 DOE O 414.1, Quality Assurance 2.2 DOE O 232.1, Occurrence Reporting and Processing of Operations Information 2.3 DOE-STD-1045-93, Guide to Good Practices for Notifications and Investigations of Abnormal Events 2.4 48 CFR 1970.5204, Department of Energy Acquisition

400

Privacy Impact Assessment OFEO Facilities Management System Facilities Center  

E-Print Network (OSTI)

Privacy Impact Assessment OFEO Facilities Management System ­ Facilities Center I. System Identification 1. IT System Name: Facilities Management System - FacilityCenter 2. IT System Sponsor: Office. IT System Manager: Michelle T. Gooch, Facilities Management Systems Manager 5. PIA Author: Michelle T. Gooch

Mathis, Wayne N.

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Operating conditions of submerged gates and possibilities of improvement  

Science Journals Connector (OSTI)

1. Submerged gates, employed at high-head hydroelectric stations, do not completely meet the demands placed on t...

P. R. Khlopenkov

1971-06-01T23:59:59.000Z

402

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] High-Speed Internet Deflects Information Overload Bookmark and Share Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. A little more room in the internet link at the ARM Southern Great Plains site is providing needed relief to the crowded lines that keep data flowing from the site. In July 2007, the internet service from the SGP Central Facility was switched to a higher speed (6 megabits) link, increasing the

403

BNL | Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven's Research Facilities Brookhaven's Research Facilities Tools of Discovery Brookhaven National Lab excels at the design, construction, and operation of large-scale, cutting-edge research facilities-some available nowhere else in the world. Each year, thousands of scientists from laboratories, universities, and industries around the world use these facilities to delve into the basic mysteries of physics, chemistry, biology, materials science, energy, and the environment-and develop innovative applications that arise, sometimes at the intersections of these disciplines. construction Brookhaven Lab is noted for the design, construction and operation of large-scale, cutting-edge research facilities that support thousands of scientists worldwide. RHIC tunnel Relativistic Heavy Ion Collider

404

ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

405

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2010 [Facility News] 15, 2010 [Facility News] Water Vapor Network at SGP Site Goes Offline Bookmark and Share Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. After nearly eleven years, the Single Frequency GPS Water Vapor Network field campaign at the ARM Southern Great Plains (SGP) site came to a close on July 1, 2010. Installed between 1999 and 2000, this network consisted of 24 GPS stations operating within an 8-kilometer radius around the SGP Central Facility near Lamont, Oklahoma. Developed to function as a single instrument, the network simultaneously measured "slant water vapor" in

406

NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

407

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

25, 2013 [Education, Facility News] 25, 2013 [Education, Facility News] Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Bookmark and Share Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. School break means vacation, and around Cape Cod, that often means a trip to the seashore. On April 17, families looking for fun and educational outdoor activities spent several hours at Cape Cod National Seashore's

408

ARM - NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

409

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2004 [Facility News] May 15, 2004 [Facility News] Mid-latitude Cirrus Cloud Experiment Underway Bookmark and Share NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. In late April, scientific collaborators at the National Aeronautics and Space Administration (NASA) carried out two high-altitude flights over the ARM Climate Research Facility Southern Great Plains (SGP) central facility. The purpose of these flights was to use a new suite of cloud property probes on the WB-57F aircraft to more accurately characterize the properties of mid-latitude cirrus clouds-which are composed solely of ice crystals-than has previously been possible. Eight flights over the SGP central facility were originally planned, but the expected cirrus clouds

410

FACILITY SAFETY (FS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACILITY SAFETY (FS) FACILITY SAFETY (FS) OBJECTIVE FS.1 - (Core Requirement 7) Facility safety documentation in support of SN process operations,is in place and has been implemented that describes the safety envelope of the facility. The, safety documentation should characterize the hazards/risks associated with the facility and should, identify preventive and mitigating measures (e.g., systems, procedures, and administrative, controls) that protect workers and the public from those hazards/risks. (Old Core Requirement 4) Criteria 1. A DSA has been prepared by FWENC, approved by DOE, and implemented to reflect the SN process operations in the WPF. (10 CFR 830.200, DOE-STD-3009-94) 2. A configuration control program is in place and functioning such that the DSA is

411

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2009 [Facility News] 7, 2009 [Facility News] Town Hall Meeting at AGU 2009 Fall Meeting Bookmark and Share ARM Climate Research Facility - New Measurement Capabilities for Climate Research Thursday, December 17, 6:15-7:15 pm, Moscone West Room 2002 American Recovery and Reinvestment Act American Recovery and Reinvestment Act Scientists from around the world use data from the ARM Climate Research Facility to study the interactions between clouds, aerosol and radiation. Through the American Recovery and Reinvestment Act of 2009, the DOE Office of Science received $1.2 billion, with $60 million allocated to the ARM Climate Research Facility. With these funds, ARM will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several sites with precipitation radars and energy flux measurement capabilities,

412

Facility Security Officer Contractor Toolcart  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 FSO News For SNL Facility Security Officers FSO Workshop 2012-CANCELLED This year's FSO Workshop has been cancelled due to lack of interest (less than 18% of our FSOs indicated they would attend this year). Instead, we will spend some serious time improving existing tools and developing new tools for you. This includes upgrading the FSO toolcart, developing SNL-specific FSO training, and looking into offering teleconferences or webinars. Here's some of your feedback that we will use for upcoming topics and improvements: Keep up with form revisions on the FSO website. Consider separate training for non-possessing (construction) versus possessing sites. Provide training on: Changes to DOE directives and upcoming changes to the complex. Where to report different things.

413

Conduct of Operations Requirements for DOE Facilities  

Directives, Delegations, and Requirements

"To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

1990-07-09T23:59:59.000Z

414

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

SciTech Connect

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

415

Northwestern University Facility for Clean Catalytic Process Research  

SciTech Connect

Northwestern University with DOE support created a Facility for Clean Catalytic Process Research. This facility is designed to further strengthen our already strong catalysis research capabilities and thus to address these National challenges. Thus, state-of-the art instrumentation and experimentation facility was commissioned to add far greater breadth, depth, and throughput to our ability to invent, test, and understand catalysts and catalytic processes, hence to improve them via knowledge-based design and evaluation approaches.

Marks, Tobin Jay [Northwestern University

2013-05-08T23:59:59.000Z

416

Charter for the ARM Climate Research Facility Science Board  

SciTech Connect

The objective of the ARM Science Board is to promote the Nations scientific enterprise by ensuring that the best quality science is conducted at the DOEs User Facility known as the ARM Climate Research Facility. The goal of the User Facility is to serve scientific researchers by providing unique data and tools to facilitate scientific applications for improving understanding and prediction of climate science.

Ferrell, W

2013-03-08T23:59:59.000Z

417

1Q CY2010 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2010 (PDF), Facility Representative Program Performance 1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March2010. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Highlights from this report are presented below." 1Q CY2010, Facility Representative Program Performance Indicators More Documents & Publications 1Q CY2011 (PDF), Facility Representative Program Performance Indicators

418

2Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2002 (PDF), Facility Representative Program Performance 2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from April to June 2002. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063-2000, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data. Overall, the percentage of fully qualified Facility Representatives increased to 80% last quarter, from 78% the previous quarter , and

419

3Q CY2010 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2010 (PDF), Facility Representative Program Performance 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these indicators are gathered by Field elements quarterly per Department of Energy (DOE) Standard (STD)-1063-2006, Facility Representative and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for July - September 2010 More Documents & Publications 3Q CY2011 (PDF), Facility Representative Program Performance Indicators

420

1Q CY2000 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2000 (PDF), Facility Representative Program Performance 1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report "The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from January 2000 to March 2000. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standard, DOE-STD-1 063, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definitions of the PIs from the Standard are also attached for your use in evaluating the data." 1Q CY2000, Facility Representative Program Performance Indicators

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

4Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 (PDF), Facility Representative Program Performance 2 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. The format of the report is changed from past reports. Information will now be provided according to the major offices having field or site office Facility Representative programs: National Nuclear Security Administration (NNSSA), the Office of

422

4Q CY2001 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2001 (PDF), Facility Representative Program Performance 4Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from October to December 2001. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data 4Q CY2001, Facility Representative Program Performance Indicators More Documents & Publications

423

3Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2007 (PDF), Facility Representative Program Performance 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2007. Data for these indicators are gathered by Field elements quarterly per Department of Energy (DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarter 's data concluded: 3Q CY2007, Facility Representative Program Performance Indicators More Documents & Publications 2Q CY2009 (PDF), Facility Representative Program Performance Indicators

424

4Q CY2004 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 (PDF), Facility Representative Program Performance 4 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from October to December 2004. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the FR program. As of December 31, 2004, 86% of all FRs were fully qualified,down from 89% the previous quarter, and exceeding the DOE goal of 80%. Several sites added new FRs or switched FRs from their exisiting facilities to new facilities, reducing the overall qualification rate.

425

1Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2003 (PDF), Facility Representative Program Performance 1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from January to March 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. The percentage of Facility Representatives who are fully qualified reached 91% across DOE. In EM the percenage of 97%, in Sc the percentage is 95% and in NNSA the percentage is 78%. The DOE goal is 75%. Staffing levels for the three organizations continue to be below

426

3Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2002 (PDF), Facility Representative Program Performance 3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2002. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063-2000, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data. The percentage of fully qualified Facility Representatives in the DOE complex

427

Calibration Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities DOE supports the development, standardization, and maintenance of calibration facilities for environmental radiation sensors. Radiation standards at the facilities are primarily used to calibrate portable surface gamma-ray survey meters and borehole logging instruments used for uranium and other mineral exploration and remedial action measurements. Standards for calibrating borehole fission neutron devices are also available, but are used infrequently. Radiation standards are constructed of concrete with elevated, uniform concentrations of naturally occurring potassium, uranium, and/or thorium. Pad standards have large, flat surfaces suitable for calibration

428

Active noise within the generating/pumping groups of a large hydroelectric plant  

Science Journals Connector (OSTI)

This work is related to a feasibility study for the implementation of an active noise control system to reduce the hydraulic turbomachines noise in the Presenzano power plant. Previous studies showed that interested turbines are low frequencies noise sources generating pure tones at 150 and 200 Hz (third and fourth harmonics of the turbines BPF). At these frequencies passive noise control systems are ineffective in front of relevant costs and an active approach was so decided to be tested. In accordance with a classical architecture the preliminary system was composed of four error microphones four secondary noise sources and a digital controller implementing an adaptive digital filter. Main performed activities could be identified through four successive steps: (i) analysis of the turbomachines generated primary field levels and space distribution (ii) secondary sources generated noise field measurement ten different loudspeakers locations were investigated at this stage; (iii) sensor and actuator locations optimization by the use of a genetic algorithms procedure and (iv) active noise control tests. A mean reduction of 15 dB at 150 Hz and 7.5 dB at 200 Hz was measured at the error sensors during these tests revealing the good opportunities of such an approach but also the opportune improvement to pass at a practical implementation.

Leonardo Lecce; Massimo Viscardi; Bruno Maja; Vincenzo Limone; Mario DIschia; Francesco Di Maso

1999-01-01T23:59:59.000Z

429

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

430

RENEWABLE ENERGY RESOURCES PROCUREMENT PLAN This Renewable Energy Resources Procurement Plan ("RPS Procurement Plan" or  

E-Print Network (OSTI)

, and tidal current Biogas Geothermal Photovoltaic Biomass Hydroelectric incremental generation from efficiency improvements Small hydroelectric (30 megawatts or less) Conduit hydroelectric Landfill gas Solar

431

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities and Capabilities Facilities and Capabilities Primary Systems Infrastructure High Performance Storage Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Facilities and Capabilities | High Performance Storage SHARE High Performance Storage and Archival Systems To meet the needs of ORNL's diverse computational platforms, a shared parallel file system capable of meeting the performance and scalability require-ments of these platforms has been successfully deployed. This shared file system, based on Lustre, Data Direct Networks (DDN), and Infini-Band technologies, is known as Spider and provides centralized access to petascale datasets from all major on-site computational platforms. Delivering more than 240 GB/s of aggregate performance,

432

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 10, 2012 [Facility News] July 10, 2012 [Facility News] Collaborations in Atmospheric Science and Observations Discussed in Germany Bookmark and Share Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the university's Jülich ObservatorY for Cloud Evolution (JOYCE) site. Crewell explained that JOYCE, like ARM facilities, was designed for long-term continuous measurements of cloud, radiation, boundary humidity, and precipitation, using active and passive remote sensing instruments. Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the

433

Test Facility Daniil Stolyarov, Accelerator Test Facility User...  

NLE Websites -- All DOE Office Websites (Extended Search)

Development of the Solid-State Laser System for the Accelerator Test Facility Daniil Stolyarov, Accelerator Test Facility User's Meeting April 3, 2009 Outline Motivation for...

434

NREL: Research Facilities - Laboratories and Facilities by Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratories and Facilities by Technology The following NREL research programs have laboratory, andor test and user facility capabilities for researching, developing, and testing...

435

Incremental Implementation of Energy Management at Industrial Facilities  

E-Print Network (OSTI)

The essential elements of a sustainable energy management program at industrial facilities are defined in the ANSI/MSE 2000 Management System for Energy standard document. Although many organizations have expressed interest in improving their energy...

Brown, M.; Key, G.

2005-01-01T23:59:59.000Z

436

Energy efficiency in California laboratory-type facilities  

SciTech Connect

The central aim of this project is to provide knowledge and tools for increasing the energy efficiency and performance of new and existing laboratory-type facilities in California. We approach the task along three avenues: (1) identification of current energy use and savings potential, (2) development of a {ital Design guide for energy- Efficient Research Laboratories}, and (3) development of a research agenda for focused technology development and improving out understanding of the market. Laboratory-type facilities use a considerable amount of energy resources. They are also important to the local and state economy, and energy costs are a factor in the overall competitiveness of industries utilizing laboratory-type facilities. Although the potential for energy savings is considerable, improving energy efficiency in laboratory-type facilities is no easy task, and there are many formidable barriers to improving energy efficiency in these specialized facilities. Insufficient motivation for individual stake holders to invest in improving energy efficiency using existing technologies as well as conducting related R&D is indicative of the ``public goods`` nature of the opportunity to achieve energy savings in this sector. Due to demanding environmental control requirements and specialized processes, laboratory-type facilities epitomize the important intersection between energy demands in the buildings sector and the industrial sector. Moreover, given the high importance and value of the activities conducted in laboratory-type facilities, they represent one of the most powerful contexts in which energy efficiency improvements stand to yield abundant non-energy benefits if properly applied.

Mills, E.; Bell, G.; Sartor, D. [and others

1996-07-31T23:59:59.000Z

437

NREL: Research Facilities Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Research Facilities Here you'll find information about the National Renewable Energy Laboratory's R&D facility and laboratory capabilities. These state-of-the-art facilities...

438

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News] 27, 2009 [Facility News] Arrival of Recovery Act Funds Sets Wheels In Motion Bookmark and Share So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. Through the American Recovery and Reinvestment Act of 2009 (aka stimulus), the Department of Energy's Office of Science received $1.2 billion. In late May, DOE released approximately $54 million-90 percent-of the $60 million allocated to the ARM Climate Research Facility. During the next 18 months, the ARM Climate Research Facility will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several

439

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

28, 2005 [Facility News] 28, 2005 [Facility News] Readiness of New Lidar Evaluated at Southern Great Plains Site Bookmark and Share Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. As the focus of the Boundary Layer Carbon Dioxide (CO2) Intensive Operational Period (IOP) starting in March, science collaborators at ITT Industries and the National Aeronautics and Space Administration (NASA)

440

PNNL: About PNNL - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Facilities Scientific Facilities At PNNL, we offer scientific researchers access to unique equipment housed in state-of-the-art facilities as well as onsite experts to help visiting researchers take advantage of and make best use of the capabilities. You also have the opportunity to collaborate with our world-renowned scientists and engineers who can help you advance your scientific research and publish your results. Take a virtual tour of some of our laboratories. William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) EMSL EMSL is a U.S. Department of Energy (DOE) national user facility currently shared and used by researchers from around the world. Research at EMSL focuses principally on developing a molecular-level understanding of the physical, chemical, and biological processes that underlie the most

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Mobile Facility Beta Testing Complete; System Headed to California Seashore Mobile Facility Beta Testing Complete; System Headed to California Seashore Bookmark and Share A key addition to the ARM Climate Research Facility scientific infrastructure is ready to roll...literally. In February, the ARM Mobile Facility (AMF) is being packed up and shipped from Richland, Washington, to the Point Reyes National Seashore north of San Francisco, California. There, it will be reassembled in preparation for its first deployment as part of a 6-month experiment to study the microphysical characteristics of marine stratus clouds, and in particular, marine stratus drizzle processes. Throughout the deployment, the AMF will accommodate aerosol observing equipment for National Oceanic and Atmospheric Administration (NOAA) researchers co-sponsored by ARM and the DOE Aerosol Science Program.

442

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Review of ARM Infrastructure Completed Review of ARM Infrastructure Completed Bookmark and Share In May, the Department of Energy's Biological and Environmental Research Advisory Committee (BERAC) published findings and recommendations from their assessment of the effectiveness of ARM Climate Research Facility as a national scientific user facility. Based on a review of total user requests, the BERAC concluded that ARM was being effectively used by the broader scientific community, not just the ARM Program. They also stated that cost cutting measures had achieved the desired efficiency goals, but further cuts could impair the Facility's operations. The subcommittee reinforced the importance of the scientific impacts of this facility (including publications), and the value it has had for the international

443

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 1, 2012 [Facility News] March 1, 2012 [Facility News] Arctic Storm Samples Show Relationship Between Sea Ice and Precipitation Over Land Bookmark and Share Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. As an important component of Earth's climate system, sea ice has a particularly strong influence on the Arctic sea surface temperature, evaporation, and reflectivity, or "albedo." The critical relationship among sea ice, evaporation, and precipitation is linked to a number of

444

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] ARM Outreach Materials Chosen for Earth Day Display in Washington DC Bookmark and Share Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Earth Day is officially honored each year on April 22, however, many groups sponsor activities throughout the entire month of April. At DOE Headquarters in Washington DC, two ARM posters were selected to join a poster display representing programs from numerous DOE offices. The display was featured in the Forrestal Building's ground-level and first floor lobby areas throughout the week of April 21. The posters were then displayed at

445

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Microwave Radiometers Put to the Test in Germany Bookmark and Share A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. Microwave radiometers (MWRs) are instruments used to measure emissions of water vapor and liquid water molecules in the atmosphere at specific microwave frequencies. Different MWRs are used to measure various frequencies, but the accuracy of all their retrievals is somewhat suspect,

446

MAX Fluid Dynamics facility  

NLE Websites -- All DOE Office Websites (Extended Search)

MAX Fluid Dynamics facility MAX Fluid Dynamics facility Capabilities Engineering Experimentation Reactor Safety Testing and Analysis Overview Nuclear Reactor Severe Accident Experiments MAX NSTF SNAKE Aerosol Experiments System Components Laser Applications Robots Applications Other Facilities Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr MAX Fluid Dynamics facility Providing high resolution data for development of computational tools that model fluid flow and heat transfer within complex systems such as the core of a nuclear reactor. 1 2 3 4 5 Hot and cold air jets are mixed within a glass tank while laser-based anemometers and a high-speed infrared camera characterize fluid flow and heat transfer behavior. Click on image to view larger size image.

447

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Commercial Infrared Sky Imagers Compared Bookmark and Share Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Four infrared imaging instruments were installed and operated at the ARM

448

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 [Facility News] 1, 2011 [Facility News] Data from Field Campaign in Black Forest, Germany, are Red Hot Bookmark and Share During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. A paper published in a special issue of the Quarterly Journal of the Royal Meteorological Society describing the scientific strategy, field phase, and

449

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2006 [Facility News] 15, 2006 [Facility News] Radar Wind Profiler Joins ARM Mobile Facility Instrument Suite Bookmark and Share This spring, a 915 MHz radar wind profiler (RWP) was successfully installed at the ARM Mobile Facility (AMF) site in Niamey, Niger, West Africa, for the remainder of the 1-year RADAGAST field campaign which started in January. The RWP will provide information about wind speed, wind direction, and wind shear, and also enable measurements of the turbulence in the lower part of the troposphere. This may be a key variable in determining the vertical distribution of dust in the experimental domain. Gradients in the radar's reflectivity spectrum may also help to provide continuous identification of the depth of the boundary layer in the summer months, when refractive gradients are likely to be maximized by low-level moisture.

450

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 3, 2004 [Facility News] December 3, 2004 [Facility News] First Deployment of ARM Mobile Facility to Occur on California Coast Bookmark and Share Image - Point Reyes Beach Image - Point Reyes Beach Point Reyes National Seashore, on the California coast north of San Francisco, has been identified as the official location for the first deployment of the DOE's Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF). As part of a 6-month field campaign beginning in March 2005 to study the microphysical characteristics of marine stratus and, in particular, marine stratus drizzle processes, the AMF will provide a mature instrument system to help fill information gaps in the existing limited surveys of marine stratus microphysical structure. Marine stratus clouds are known to be susceptible to the byproducts of fossil fuel consumption, a

451

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2013 [Facility News] 9, 2013 [Facility News] ARM Facility Shares Return on Science Investments Bookmark and Share The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. To quote Ben Franklin, "If a man empties his purse into his head, no man can take it away from him. An investment in knowledge always pays the best interest." ARM Climate Research Facility staff who attended the fourth annual Atmospheric System Research (ASR) Science Team Meeting in April received a healthy dose of interest in March! With over 350 attendees presenting nearly 250 posters, the wealth of atmospheric climate science knowledge

452

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 20, 2011 [Facility News] May 20, 2011 [Facility News] From Snow to Sand; Mobile Facility Headed to the Maldives Bookmark and Share AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. After spending six very snowy months at Steamboat Springs, Colorado, the second ARM Mobile Facility (AMF2) is switching gears and heading to the tropical climes of the Maldives in the Indian Ocean. In mid-April, the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX) came to a close, ending the final chapter of the AMF2's maiden deployment. After packing up the instruments and data systems, the AMF2 team is now preparing

453

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Service Conserves Cash Satellite Service Conserves Cash Bookmark and Share In April, operations personnel completed a series of cost-saving data communication changes at the ARM Climate Research Facility Southern Great Plains (SGP) locale. The T-1 telephone lines at the four SGP boundary facilities were replaced with satellite dish technology. This change still allows large data sets to be transferred at acceptable bandwidth but at substantial savings. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Huge amounts of data are collected daily by SGP site instruments. These data must be transmitted rapidly and reliably from remote measurement

454

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

2, 2012 [Data Announcements, Facility News] 2, 2012 [Data Announcements, Facility News] Toolkit for ARM Radar Data Previewed at Workshop Bookmark and Share This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge. This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge.

455

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 [Facility News] March 31, 2009 [Facility News] New Sensors Installed for Cloud Radar Calibration at North Slope Bookmark and Share Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Cloud radars at the ARM sites provide important information about cloud properties and continue to evolve in providing climate researchers more complex data. This creates a greater need to know the absolute calibration of the radar reflectivity measurement. However, the large and immobile antenna for the millimeter wavelength cloud radar (MMCR) is impossible to point directly at a calibration target. At the ARM North Slope of Alaska

456

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2006 [Facility News] May 15, 2006 [Facility News] New Micropulse Lidars to Replace Old Ones; Deployments Begin at SGP Bookmark and Share A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. On May 3, the first of seven new and upgraded micropulse lidars (MPLs) was deployed at the ARM Southern Great Plains (SGP) site's Central Facility. These seven identical systems (including one spare) will replace the existing MPLs deployed at facilities throughout the SGP site and include new polarization capability. The MPLs provide critical backscatter

457

Nuclear Facility Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design FUNCTIONAL AREA GOAL: Headquarters and Field organizations and their contractors ensure that nuclear facilities are designed to assure adequate protection for the public, workers, and the environment from nuclear hazards. REQUIREMENTS:  10 CFR 830.120  10 CFR 830 subpart B  DOE O 413.3  DOE O 420.1B  DOE O 414.1C  DOE O 226.1  DOE M 426.1  DEAR 970-5404-2 Guidance:  DOE G 420.1-1  Project Management Practices, Integrated Quality ( Rev E, June 2003)  DOE Implementation Plan for DNSB Recommendation 2004-2 Performance Objective 1: Contractor Program Documentation Contracts between and the contractors who operate nuclear facilities contain adequate requirements concerning the conduct of nuclear facility safety design for nuclear facility capital projects and major modifications and the

458

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

field campaign are now open. GOAMAZON is a deployment of the ARM Mobile Facility to Brazil beginning in 2014. The three calls are being issued in coordination by the U.S....

459

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 16, 2008 Facility News 21st Century "Paper Boy" Begins Delivering ARM News Bookmark and Share A reorganized ARM News Center now offers RSS feeds-subscription services...

460

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Preparations Underway for 2007 ARM Mobile Facility Deployment in Germany Bookmark and Share In the Black Forest region of Germany, the COPS field campaign will cover an area of...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 15, 2008 Facility News CLASIC Discussed at Workshop in Oklahoma Bookmark and Share Participants at the CLASIC workshop in March 2008 listen intently to one of the many...

462

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ` NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK March 2007 CEC-300 Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE CALIFORNIA ENERGY COMMISSION Jeffrey D. Byron B.B. Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE Mark

463

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK APRIL 2006 CEC-300 Director Heather Raitt Technical Director Renewable Energy Program Drake Johnson Office Manager Renewable Energy Office Valerie Hall Deputy Director Efficiency, Renewables, and Demand Analysis Division #12;These

464

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

and Share Researchers installed a continuous 222Rn monitor at the base of the 60-meter tower at the SGP Central Facility. A sampling tube connected to the tower supplies air...

465

NETL - Fuel Reforming Facilities  

ScienceCinema (OSTI)

Research using NETL's Fuel Reforming Facilities explores catalytic issues inherent in fossil-energy related applications, including catalyst synthesis and characterization, reaction kinetics, catalyst activity and selectivity, catalyst deactivation, and stability.

None

2014-06-27T23:59:59.000Z

466

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2014 Facility News New 3D Tour Brings Users to the Southern Great Plains Site...Virtually Bookmark and Share The virtual tour home page illustrates the full magnitude of the...

467

B Plant facility description  

SciTech Connect

Buildings 225B, 272B, 282B, 282BA, and 294B were removed from the B Plant facility description. Minor corrections were made for tank sizes and hazardous and toxic inventories.

Chalk, S.E.

1996-10-04T23:59:59.000Z

468

Photovoltaic Research Facilities  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) funds photovoltaic (PV) research and development (R&D) at its national laboratory facilities located throughout the country. To encourage further innovation,...

469

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

at the SGP Central Facility. Radar wind profilers (RWPs) provide hourly measurements of wind speed and direction from 100 m to 5 km above the ground. Between 1992 and 1996, four...

470

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2007 Facility News Kelle Smith Replaces Jan Gunter as ExtraView Administrator Bookmark and Share Kelle Smith assumed the duties of ExtraView administrator after Jan...

471

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2006 [Facility News] January 15, 2006 [Facility News] ARM Mobile Facility Begins Year-Long Deployment in Africa Bookmark and Share Beginning on January 9, the ARM Mobile Facility began officially collecting atmospheric data from a location at the airport in Niamey, Niger, Africa. As part of the RADAGAST field campaign, the AMF will measure the effects of absorbing aerosols from desert dust in the dry season, and the effects of deep convective clouds and associated moisture loadings on the transmission of atmospheric radiation during the summer monsoon. These measurements will be combined with associated satellite data to provide the first well-sampled direct estimates of the energy balance across the atmosphere. This dataset will provide valuable information to an ongoing effort called

472

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2009 [Facility News] 5, 2009 [Facility News] Turning a New Page with Facebook; Are You a Fan? Bookmark and Share Keep up with the ARM Climate Research Facilty via Facebook! Keep up with the ARM Climate Research Facilty via Facebook! As a scientific user facility for the global change research community, the ARM Climate Research Facility strives to provide data and share its climate observation capabilities with researchers around the world. In a continuing effort to reach new users, ARM is turning another page in its outreach strategy with a presence on Facebook. (You must have a Facebook account to access the page; if you don't have one, it is free and easy to create one.) Savvy Internet users of all ages increasingly use these types of communication tools to track topics of interest and share information with

473

Light-Source Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility, P.R. China CANDLE, Armenia HSRC - Hiroshima Synchrotron Radiation Center, Japan iFEL - Institute of Free Electron Laser, Japan INDUS 1 INDUS 2, India IR FEL...

474

Recommissioning the K-1600 Seismic Test Facility  

SciTech Connect

The Center of Natural Phenomena Engineering (CNPE) was established under the technical direction of Dr. James E. Beavers with a mandate to assess, by analyses and testing, the seismic capacity of building structures that house sensitive processes at the Oak Ridge Y-12 Plant. This mandate resulted in a need to recommission the K-1600 Seismic Test Facility (STF) at the Oak Ridge K-25 Site, which had been shutdown for 6 years. This paper documents the history of the facility and fives some salient construction, operation, and performance details of its 8-ton, 20-foot center of gravity payload bi-axial seismic simulator. A log of activities involved in the restart of this valuable resource is included as Table 1. Some of problems and solutions associated with recommissioning the facility under a relatively limited budget are included. The unique attributes of the shake table are discussed. The original mission and performance requirements are compared to current expanded mission and performance capabilities. Potential upgrades to further improve the capabilities of the test facility as an adjunct to the CNPE are considered. Additional uses for the facility are proposed, including seismic qualification testing of devices unique to enrichment technologies and associated hazardous waste treatment and disposal processes. In summary, the STF restart in conjunction with CNPE has added a vital, and unique facility to the list of current national resources utilized for earthquake engineering research and development. 3 figs., 1 tab.

Wynn, C.C. (Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States)); Brewer, D.W. (Oak Ridge National Lab., TN (United States))

1991-10-01T23:59:59.000Z

475

CRAD, Facility Safety - Nuclear Facility Safety Basis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Facility Safety - Nuclear Facility Safety Basis More Documents & Publications CRAD, Facility Safety - Unreviewed Safety Question Requirements Site Visit Report, Livermore Site Office - February 2011 FAQS Job Task Analyses - Nuclear Safety Specialist

476

Nuclear Power Facilities (2008) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power Facilities (2008) Nuclear Power Facilities (2008) Nuclear Power Facilities (2008) More Documents & Publications Financial Institution Partnership Program - Commercial...

477

Personnel Support Facility (PSF)  

Virginia Beach, VA The Personnel Support Facility (PSF) provides space for a library, the Navy Marine Corps Relief Society, the Substance Abuse Rehabilitation Program, St. Leo College, and the Navy College Program. A design-build project of brick, masonry, and steel, PSF is part of a post-occupancy evaluation study run by Naval Facilities Engineering Command. The study is being used to determine the benefits of green design.

478

Company Name Tax Credit* Manufacturing Facility's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company Company Name Tax Credit* Manufacturing Facility's City & State Project Description Carrier Corporation $5.1 million Indianapolis, IN Carrier, a part of UTC Building & Industrial Systems and a subsidiary of United Technologies Corporation, was selected for a $5.1 million dollar 48C Advanced Energy Manufacturing Tax Credit to expand production at its Indianapolis facility to meet increasing demand for its eco-friendly condensing gas furnace product line. The new line includes the most energy efficient gas furnaces on the market-all with at least 92% annual fuel utilization efficiency-and exemplifies Carrier's commitment to economical and environmentally sustainable solutions for achieving improved energy efficiency and performance.

479

Ultrafast Laser Facility | Photosynthetic Antenna Research Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Ultrafast Laser Facility Ultrafast Laser Facility Click for an Overview of the Ultrafast Laser Facility The PARC Ultrafast Laser Facility, under the direction of Associate Director...

480

Wheelabrator Saugus Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Saugus Biomass Facility Jump to: navigation, search Name Wheelabrator Saugus Biomass Facility Facility Wheelabrator Saugus Sector Biomass Facility Type Municipal Solid Waste...

Note: This page contains sample records for the topic "hydroelectric facility improvement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Santa Clara Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Biomass Facility Jump to: navigation, search Name Santa Clara Biomass Facility Facility Santa Clara Sector Biomass Facility Type Landfill Gas Location Santa Clara County,...

482

Hutchins LFG Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Hutchins LFG Biomass Facility Jump to: navigation, search Name Hutchins LFG Biomass Facility Facility Hutchins LFG Sector Biomass Facility Type Landfill Gas Location Dallas County,...

483

Cold Vacuum Drying Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Disposal Facility U Plant Vitrification Plant Waste Encapsulation and Storage Facility Waste Receiving and Processing Facility Waste Sampling and Characterization Facility Waste...

484

Tevatron improvement program  

SciTech Connect

A modest Tevatron improvement program is suggested which would provide a storage ring for dedicated use as a p anti p collider at 2 TeV (cm) and as an ep collider at 0.2 TeV (cm). It could also serve as a useful test facility for some of the new developments necessary for an economical SSC. Because use could be made of utilities and facilities that are already installed as part of the tevatron, the cost of the p anti p option might be about 100 million dollars (not including the interaction halls or detectors). The additional cost of a 10 x 1000 GeV' ep option might be about 70 million dollars. The experimental facilities at B and D of the Tevatron might be extended for use with the new collider. As the technology of superconducting magnets develops, the cm energy of the p anti p and the ep colliders might be doubled. The intention is either to double the capability of TeV I and TeV II, or to extend the capability by addition of an ep facility. Alternatively, by adding another proton ring, a high luminosity pp facility might also result.

Wilson, R.R.

1983-07-01T23:59:59.000Z

485

Hanford facility contingency plan  

SciTech Connect

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

486

HFIR Experiment Facilities | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Experiment Facilities Experiment Facilities HFIR Experiment Facilities Neutron Scattering Facilities Target Positions Experiment Facilities in the Beryllium Reflector Large Removable Beryllium Facilities Small Removable Beryllium Facilities Control-Rod Access Plug Facilities Small Vertical Experiment Facilities Large Vertical Experiment Facilities Hydraulic Tube Facility Peripheral Target Positions Neutron Activation Analysis (NAA) Laboratory and Pneumatic Tube Facilities Slant Engineering Facilities Gamma Irradiation Facility Quality Assurance Requirements Contact Information Neutron Scattering Facilities The fully instrumented HFIR will eventually include 15 state-of-the-art neutron scattering instruments, seven of which will be designed exclusively for cold neutron experiments, located in a guide hall south of the reactor

487

1999 FACILITY REPRESENTATIVE CONFERENCE June 21 - 25, 1999 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1999 FACILITY REPRESENTATIVE CONFERENCE June 21 - 25, 1999 1999 FACILITY REPRESENTATIVE CONFERENCE June 21 - 25, 1999 1999 FACILITY REPRESENTATIVE CONFERENCE June 21 - 25, 1999 The Department of Energy will host the Facility Representative Annual Meeting on June 21-25, 1999 at the Alexis Park Hotel in Las Vegas, Nevada. The meeting will give Facility Representatives and line management the opportunity to share lessons learned, and to discuss upcoming program improvements. There is no cost for the meeting, however, rooms reserved at the government rate are limited so if you are planning on attending, please make reservations as soon as possible. The hotel phone number is 1-800-453-8000. For more information, please contact Joe Hassenfeldt, Facility Representative Program Manager, FM-10, at 202-586-1643." Microsoft Word - Document1

488

4Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2005 (PDF), Facility Representative Program Performance 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. As of December 31, 2005 78% of all FRs were fully qualified , down from the 84% the previous quarter, and below the DOE goal of 80%. Site offices hired 11 new FRs in the quarter and several sites moved FRs to new facilities, thus requiring new qualifications.

489

2Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2005 (PDF), Facility Representative Program Performance 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. As of June 30,2005, 97% of all FRs were fully qualified, down from 88% the previous quarter, but exceeding the DOE goal of 80%. Eighteen of 27 reporting sites meet the goal of FR qualifications. 2Q CY2005, Facility Representative Program Performance Indicators

490

3Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2005 (PDF), Facility Representative Program Performance 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. As of September 30,2005, 84% of all FRs were fully qualified , down from 87% the previous quarter, but exceeding the DOE goal of 80%. Several sites shifted fully-qualifed FRs to new facilities, thus requiring new qualifications. Although the overall percentage of fully qualified FRS

491

1Q CY2011 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2011 (PDF), Facility Representative Program Performance 1Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period January through March 2011. Data for these indicators were gathered by Field Elements per Department of Energy's (DOE) Technical Standard (STD) 1063-2011, Facility Representatives, and reported to Headquarters Program Offices for evaluation and feedback to improve the FR Program. This report reflects changes in DOE STD 1063-2011 that deleted one indicator and changed the way two others are calculated. The changes are discussed below. Facility Representative Program Performance Indicators for January - March

492

DECONTAMINATION TECHNOLOGIES FOR FACILITY REUSE  

SciTech Connect

As nuclear research and production facilities across the U.S. Department of Energy (DOE) nuclear weapons complex are slated for deactivation and decommissioning (D&D), there is a need to decontaminate some facilities for reuse for another mission or continued use for the same mission. Improved technologies available in the commercial sector and tested by the DOE can help solve the DOE's decontamination problems. Decontamination technologies include mechanical methods, such as shaving, scabbling, and blasting; application of chemicals; biological methods; and electrochemical techniques. Materials to be decontaminated are primarily concrete or metal. Concrete materials include walls, floors, ceilings, bio-shields, and fuel pools. Metallic materials include structural steel, valves, pipes, gloveboxes, reactors, and other equipment. Porous materials such as concrete can be contaminated throughout their structure, although contamination in concrete normally resides in the top quarter-inch below the surface. Metals are normally only contaminated on the surface. Contamination includes a variety of alpha, beta, and gamma-emitting radionuclides and can sometimes include heavy metals and organic contamination regulated by the Resource Conservation and Recovery Act (RCRA). This paper describes several advanced mechanical, chemical, and other methods to decontaminate structures, equipment, and materials.

Bossart, Steven J.; Blair, Danielle M.

2003-02-27T23:59:59.000Z

493

Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition  

SciTech Connect

Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems; water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.

Wilson, A.

2001-05-16T23:59:59.000Z

494

Facilities | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Inertial Confinement Fusion Inertial Confinement Fusion Facilities Home > About Us > Our Programs > Defense Programs > Office of Research, Development, Test, and Evaluation > Office of Inertial Confinement Fusion > Facilities Facilities Office of Inertial Confinement Fusion, Facilities ICF operates a set of world-class experimental facilities to create HEDP conditions and to obtain quantitative data in support of its numerous stockpile stewardship-related activities. To learn about three high energy experimental facilities and two small lasers that provide ICF capabilities, select the links below. National Ignition Facility, Lawrence Livermore National Laboratory OMEGA and OMEGA EP, University of Rochester Laboratory for Laser Energetics Z Machine, Sandia National Laboratories

495

Nuclear Facility Safety Basis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Basis Safety Basis FUNCTIONAL AREA GOAL: A fully compliant Nuclear Facility Safety Basis. Program is implemented and maintained across the site. REQUIREMENTS:  10 CFR 830 Subpart B Guidance:  DOE STD 3009  DOE STD 1104  DOE STD  DOE G 421.1-2 Implementation Guide For Use in Developing Documented Safety Analyses To Meet Subpart B Of 10 CFR 830  DOE G 423.1-1 Implementation Guide For Use In Developing Technical Safety Requirements  DOE G 424.1-1 Implementation Guide For Use In Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation The site contractor has developed an up-to-date, comprehensive, compliant, documented nuclear facility safety basis and associated implementing mechanisms and procedures for all required nuclear facilities and activities (10 CFR

496

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2010 [Facility News] August 15, 2010 [Facility News] Micropulse Lidars Get Boost from Recovery Act Bookmark and Share Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Through funding from the American Recovery and Reinvestment Act of 2009, ARM is upgrading the micropulse lidars (MPL) throughout the user facility. Similar to a radar, the MPL sends pulses of energy into the atmosphere.

497

SEU Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Logo The SEU Test Facility Logo The SEU Test Facility 1. Introduction The uninterrupted and progressive miniaturization of microelectronic devices while resulting in more powerful computers, has also made these computers more susceptible to the effects of ionizing radiation. This is of particular concern for space applications due to the radiation fields encountered outside the protective terrestrial atmosphere and magnetosphere. Starting in 1987, a coalition of US government agencies (NSA, NASA, NRL and USASSDC ) collaborated with BNL to develop a powerful and user-friendly test facility for investigating space-radiation effects on micro-electronic devices[1]. The main type of effects studied are the so called Single Event Upsets (SEUs) where ionization caused by the passage of

498

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2007 [Facility News] January 11, 2007 [Facility News] ARM Mobile Facility Moves to China in 2008 for Study of Aerosol Impacts on Climate Bookmark and Share Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) China generates exceptionally high amounts of aerosol particles whose influence on the atmosphere has been detected across the Pacific Rim. In the Yangtze River delta in southeast China, these high aerosol loadings

499

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

The Tale of the Tapes-No More Boxes of Data! The Tale of the Tapes-No More Boxes of Data! Bookmark and Share In October 1997, the ARM Program entered into a contract with the University of Alaska-Fairbanks to obtain image data covering the ARM Climate Research Facility's North Slope of Alaska (NSA) locale. Image data taken by an advanced very high resolution radiometer (AVHRR) are collected by a satellite receiver at Fairbanks and, up until February 2004, were stored on 4mm tapes. These boxes were then shipped by the boxful to the ARM Climate Research Facility External Data Center every six months. Once at the External Data Center, the data was processed into standard "hierarchical data format" or HDF files and transferred to the ARM Climate Research Facility Data Archive for use by ARM researchers. All data from

500

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 8, 2012 [Facility News] October 8, 2012 [Facility News] Near Miss at Barrow Due to Beach Erosion Bookmark and Share With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. On a stormy Friday evening in early September, Walter Brower received an urgent message: "Beach erosion very close to ECOR Point." Brower is the local facility manager for ARM's North Slope of Alaska site in Barrow. His duties extend to Point Barrow at the coastline of the Arctic Ocean, where ARM operates an eddy correlation flux measurement system, or