National Library of Energy BETA

Sample records for hp system management

  1. HP XC System Cast Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Linux in High Performance Computing vendor perspective Scott McClellan CTO/HPTCD Salishan Conference - April '03 page 2 HP Confidential Perspective * My Role/Background - CTO of the HPTCD division in the new HP - Background: * pm-HP (1984); commercial computing; OS development (lead architect MPE); telecom(carrier-grade severs & HA architect); joined HPTCD in June/'02 * This presentation represents my personal opinion, not the official position of HP. * HP is - HW vendor (servers - Total

  2. U-137: HP Performance Manager Unspecified Bug Lets Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    vulnerability has been identified with HP Performance Manager running on HP-UX, Linux, Solaris, and Windows. The vulnerability could be exploited remotely to execute...

  3. V-146: HP Service Manager Bugs Permit Cross-Site Scripting and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: HP Service Manager Bugs Permit Cross-Site Scripting and Information Disclosure Attacks V-146: HP Service Manager Bugs Permit Cross-Site Scripting and Information Disclosure...

  4. V-218: HP Service Manager Unspecified Flaw Lets Remote Users Gain Unauthorized Access

    Broader source: Energy.gov [DOE]

    This security update resolves a vulnerability in the HP Service Manager which allows people to have access to unauthorized information

  5. Tonopah Test Range EGS graphics tracking display system: HP370

    SciTech Connect (OSTI)

    Meyer, R.H.; Bauhs, K.C.

    1994-08-01

    This report describes the HP370 component of the Enhanced Graphics System (EGS) used at Tonopah Test Range (TTR). Selected Radar data is fed into the computer systems and the resulting tracking symbols are displayed on high-resolution video monitors in real time. These tracking symbols overlay background maps and are used for monitoring/controlling various flight vehicles. This report discusses both the operational aspects and the internal configuration of the HP370 Workstation portion of the EGS system.

  6. U-204: HP Network Node Manager i Input Validation Hole Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager I (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  7. U-229: HP Network Node Manager i Input Validation Flaw Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager i (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  8. V-218: HP Service Manager Unspecified Flaw Lets Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U-010:HP Onboard Administrator Unspecified Flaw Lets Remote Users Gain Access U-029: TCPIP Services for OpenVMS POPIMAP Service Bug Lets Remote Users Gain Unauthorized Access...

  9. U-238: HP Service Manager Input Validation Flaw Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    Cross-site scripting (XSS) vulnerability in HP Service Manager Web Tier 7.11, 9.21, and 9.30, and HP Service Center Web Tier 6.28, allows remote attackers to inject arbitrary web script or HTML via unspecified vectors.

  10. U-274: HP Network Node Manager I (NNMi) for HP-UX, Linux, Solaris, and Windows, Remote Disclosure of Information

    Broader source: Energy.gov [DOE]

    Vulnerabilities can be exploited by malicious people to cause a DoS (Denial of Service) and potentially compromise a vulnerable system.

  11. U-013: HP Data Protector Multiple Unspecified Vulnerabilities

    Broader source: Energy.gov [DOE]

    Multiple vulnerabilities were reported in HP Data Protector. A remote user can execute arbitrary code on the target system.

  12. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  13. T-588: HP Virtual SAN Appliance Stack Overflow

    Office of Energy Efficiency and Renewable Energy (EERE)

    A vulnerability has been reported in HP StorageWorks P4000 Virtual SAN Appliance Software, which can be exploited by malicious people to compromise a vulnerable system.

  14. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  15. U-201: HP System Management Homepage Bugs Let Remote Users Deny Service

    Broader source: Energy.gov [DOE]

    The vulnerabilities could be exploited remotely resulting in unauthorized access, disclosure of information, data modification, Denial of Service (DoS), and execution of arbitrary code.

  16. Perlick: ENERGY STAR Referral (HP72ROO-S)

    Broader source: Energy.gov [DOE]

    DOE referred Perlick refrigerator HP72ROO-S to EPA, brand manager of the ENERGY STAR program, for appropriate action after DOE testing revealed that the model does not meet ENERGY STAR requirements.

  17. Perlick: ENERGY STAR Referral (HP48RO-S)

    Broader source: Energy.gov [DOE]

    DOE referred Perlick refrigerator HP48RO-S to EPA, brand manager of the ENERGY STAR program, for appropriate action after DOE testing revealed that the model does not meet ENERGY STAR requirements.

  18. emergency management systems

    National Nuclear Security Administration (NNSA)

    9%2A en Building International Emergency Management Systems http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorisminternationalprograms-1

  19. System Management Software

    Energy Science and Technology Software Center (OSTI)

    2013-02-22

    MacPatch is Mac OS X system management software solution. It's used for patching, software distribution and inventory.

  20. V-141: HP ElitePad 900 Secure Boot Bug Lets Local Users Boot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: HP ElitePad 900 Secure Boot Bug Lets Local Users Boot to Other Operating Systems V-141: HP ElitePad 900 Secure Boot Bug Lets Local Users Boot to Other Operating Systems April...

  1. U-208: HP Operations Agent Bugs Let Remote Users Execute Arbitrary Code

    Broader source: Energy.gov [DOE]

    Two vulnerabilities were reported in HP Operations Agent. A remote user can execute arbitrary code on the target system

  2. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-11-02

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1B.

  3. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  4. Item Management Control System

    Energy Science and Technology Software Center (OSTI)

    1993-08-06

    The Item Management Control System (IMCS) has been developed at Idaho National Engineering Laboratory to assist in organizing collections of documents using an IBM-PC or similar DOS system platform.

  5. Metadata management staging system

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. An evolution of our Node.js and CouchDb metadata management system. This one focuses on server functionality and uses a well-documented, rational and REST-ful API for data access.

  6. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  7. Lithium battery management system

    DOE Patents [OSTI]

    Dougherty, Thomas J.

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  8. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-11

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1C. Cancels DOE M 151.1-1.

  9. Oil field management system

    DOE Patents [OSTI]

    Fincke, James R.

    2003-09-23

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  10. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, Joao E.; Williams, Daniel W.

    1996-01-01

    A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  11. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, J.E.; Williams, D.W.

    1995-01-01

    A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  12. Computer memory management system

    DOE Patents [OSTI]

    Kirk, III, Whitson John

    2002-01-01

    A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

  13. Management control system description

    SciTech Connect (OSTI)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  14. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-08-21

    The Order establishes policy and assigns and describes roles and responsibilities for the DOE Emergency Management System. Cancels DOE 5500.1B, DOE 5500.2B, DOE 5500.3A, DOE 5500.4A, 5500.5A,5500.7B, 5500.8A, 5500.9A, DOE 5500.10

  15. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. (This is an administrative change to DOE O 151.1A). Canceled by DOE O 151.1C. Cancels DOE O 151.1A.

  16. Analytical Services Management System

    Energy Science and Technology Software Center (OSTI)

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standardmore » chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.« less

  17. Analytical Services Management System

    SciTech Connect (OSTI)

    Church, Shane; Nigbor, Mike; Hillman, Daniel

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standard chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.

  18. T-643: HP OpenView Storage Data Protector Unspecified Code Execution Vulnerability

    Broader source: Energy.gov [DOE]

    A vulnerability has been reported in HP OpenView Storage Data Protector, which can be exploited by malicious people to compromise a vulnerable system.

  19. T-538: HP OpenView Storage Data Protector Bug Lets Remote Users Execute Arbitrary Code

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in HP OpenView Storage Data Protector. A remote user can execute arbitrary code on the target system.

  20. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C.; Johnson, Kris W.; Akasam, Sivaprasad; Hoff, Brian D.

    2007-10-02

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  1. Chemical Management System

    Energy Science and Technology Software Center (OSTI)

    1998-10-30

    CMS provides an inventory of all chemicals on order or being held in the laboratory, to provide a specific location for all chemical containers, to ensure that health and safety regulatory codes are being upheld, and to provide PNNL staff with hazardous chemical information to better manage their inventories. CMS is comprised of five major modules: 1) chemical purchasing, 2) chemical inventory, 3) chemical names, properties, and hazard groups, 4) reporting, and 5) system administration.

  2. Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25

    The order establishes policy, and assigns and describes roles and responsibilities for the DOE Emergency Management System. DOE 5500.1B Chg 1; DOE 5500.2B Chg 1; DOE 5500.3A Chg 1; DOE 5500.4A; DOE 5500.5A; DOE 5500.7B; DOE 5500.8A; DOE 5500.9A, and DOE 5500.10A Chg 1. Canceled by DOE O 151.1A.

  3. Safety Management System Policy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable ...

  4. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  5. Cryptographic Key Management System

    SciTech Connect (OSTI)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  6. Computerized training management system

    DOE Patents [OSTI]

    Rice, Harold B.; McNair, Robert C.; White, Kenneth; Maugeri, Terry

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  7. Computerized training management system

    DOE Patents [OSTI]

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  8. Project Management Information Systems (PMIS) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight...

  9. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-05-06

    The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

  10. Integrated Management Tracking System

    Energy Science and Technology Software Center (OSTI)

    2000-03-30

    The Integrated Management Tracking System (IMTS) is a "Web Enabled" Client/Server Business application that provides for the Identification and Resolution of commitments, situations, events and problems. The IMTS engine is written with Microsoft Active Server Pages (ASP) for IIS4. The system provides for reporting, entering, editing, closing and administration over a Intranet, Extranet or Internet. This Application facilitates: Electronic assignment, acceptance and tracking to completion. Email notifications of assigned action. Establishment of Due Dates. Electronicmore » search and retrieval based on keywords in combination with user specified database parameters (Document Type, Date Ranges, etc.). Coded for Trending and Reporting. User selected reports. Various levels of access for reports and administration. The "Server" side of this application consists of a Microsoft Access database running on a NT Server with Internet Information Server (IIS). As the "Client" side of the application runs on any Web browser, this solution is a cost effective, user friendly application that lends itself to organizations not physically colocated in one location providing information immediately available to everyone at once.« less

  11. Crystal Structure of the HP1-EMSY Complex Reveals an Unusual Mode of HP1 Binding

    SciTech Connect (OSTI)

    Huang,Y.; Myers, M.; Xu, R.

    2006-01-01

    Heterochromatin protein-1 (HP1) plays an essential role in both the assembly of higher-order chromatin structure and epigenetic inheritance. The C-terminal chromo shadow domain (CSD) of HP1 is responsible for homodimerization and interaction with a number of chromatin-associated nonhistone proteins, including EMSY, which is a BRCA2-interacting protein that has been implicated in the development of breast and ovarian cancer. We have determined the crystal structure of the HP1{beta} CSD in complex with the N-terminal domain of EMSY at 1.8 Angstroms resolution. Surprisingly, the structure reveals that EMSY is bound by two HP1 CSD homodimers, and the binding sequences differ from the consensus HP1 binding motif PXVXL. This structural information expands our understanding of HP1 binding specificity and provides insights into interactions between HP1 homodimers that are likely to be important for heterochromatin formation.

  12. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    To support DOE's initiatives to improve program, project, and contract management through the implementation and surveillance of a contractor's Earned Value Management System (EVMS) that is in conformance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the American National Standards Institute/Electronic Industries Alliance (ANSI/EIA)-748-B, Earned Value Management System (or as required by contract), and Federal Acquisition Regulation (FAR) 52.234-4, Earned Value Management System (EVMS). Admin Chg 1 dated 10-22-2015.

  13. PNNL: About - Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  14. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Supersedes DOE G 413.3-10.

  15. EARNED VALUE MANAGEMENT SYSTEM

    Broader source: Energy.gov (indexed) [DOE]

    ... the costs associated with the authorized resources identified to accomplish the work and invalidates management's forecasting of future resource requirements and their costs. ...

  16. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  17. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-08-25

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  18. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-02-24

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  19. HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies...

  20. HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers...

    Office of Environmental Management (EM)

    HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies ...

  1. Fuel cell gas management system

    DOE Patents [OSTI]

    DuBose, Ronald Arthur

    2000-01-11

    A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

  2. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  3. U-203: HP Photosmart Bug Lets Remote Users Deny Service

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in HP Photosmart. A remote user can cause denial of service conditions.

  4. Integrated Safety Management System Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-01

    This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

  5. Shopping for outage management systems

    SciTech Connect (OSTI)

    Chou, Y.C.; Konneker, L.K.; Watkins, T.R.

    1995-12-31

    Customer service is becoming increasingly important to electric utilities. Outage management is an important part of customer service. Good outage management means quickly responding to outages and keeping customers informed about outages. Each outage equals lost customer satisfaction and lost revenue. Outage management is increasingly important because of new competition among utilities for customers, pressure from regulators, and internal pressure to cut costs. The market has several existing software products for outage management. How does a utility judge whether these products satisfy their specific needs? Technology is changing rapidly to support outage management. Which technology is proven and cost-effective? The purpose of this paper is to outline the procedure for evaluating outage management systems, and to discuss the key features to look for. It also gives our opinion of the features that represent state of the art. This paper will not discuss specific products or list vendors names.

  6. Device configuration-management system

    SciTech Connect (OSTI)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information.

  7. Safety Management System Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Safety » Safety Management System Policy Safety Management System Policy Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through Department of Energy (DOE) directives and contracts to establish the Department-wide safety management objective, guiding principles, and functions. The DOE safety management system consists of six

  8. XCPU2 process management system

    SciTech Connect (OSTI)

    Ionkov, Latchesar; Van Hensbergen, Eric

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  9. Facilities Information Management System (FIMS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, ...

  10. Heating System Modernization, Management of Peripheral Scope...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report,...

  11. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  12. Managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.M.; Murphy, M.D.

    1995-07-01

    A methodology for risk management in the design of software systems is presented. It spans security, safety, and correct operation of software within the context of its environment, and produces a risk analysis and documented risk management strategy. It is designed to be iteratively applied, to attain appropriate levels of detail throughout the analysis. The methodology and supporting tools are discussed. The methodology is critiqued relative to other research in the field. Some sample applications of the methodology are presented.

  13. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government

  14. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  15. Thermal management systems and methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  16. Battery Thermal Management System Design Modeling (Presentation)

    SciTech Connect (OSTI)

    Kim, G-H.; Pesaran, A.

    2006-10-01

    Presents the objectives and motivations for a battery thermal management vehicle system design study.

  17. Information system revives materials management

    SciTech Connect (OSTI)

    Hansen, T.

    1995-12-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD).

  18. COKEMASTER: Coke plant management system

    SciTech Connect (OSTI)

    Johanning, J.; Reinke, M.

    1996-12-31

    To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

  19. Active Diesel Emission Control Technology for Sub-50 HP Engines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sub-50 HP Engines with Low Exhaust Temperature Profiles Active Diesel Emission Control Technology for Sub-50 HP Engines with Low Exhaust Temperature Profiles A new type of emission ...

  20. U-010:HP Onboard Administrator Unspecified Flaw Lets Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0:HP Onboard Administrator Unspecified Flaw Lets Remote Users Gain Access U-010:HP Onboard Administrator Unspecified Flaw Lets Remote Users Gain Access October 13, 2011 - 8:15am...

  1. Metrics for border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  2. From: Mulveny, Jennifer [mailto:jennifer.mulveny@hp.com]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mulveny, Jennifer [mailto:jennifer.mulveny@hp.com] Sent: Tuesday, April 17, 2012 4:04 PM To: Mulveny, Jennifer; Exparte Communications Cc: Watt, Steve; Kido, Michael Subject: RE: HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies This following notes summarize the discussion that HP held via teleconference with the Department of Energy on April 10, 2012. Hewlett-Packard Company (HP) appreciates the opportunity to comment on the new DOE rulemaking for Battery

  3. ORISE: Performance Improvement Management System (PIMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Improvement Management System (PIMS) PIMS web-based application aids Veterans Health Administration (VHA) Emergency Management in response to local emergencies and...

  4. PIA - Human Resources Management Information System (HRMIS) ...

    Broader source: Energy.gov (indexed) [DOE]

    Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) (490.32 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - ...

  5. Integrated Building Management System (IBMS)

    SciTech Connect (OSTI)

    Anita Lewis

    2012-07-01

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  6. Appropriate Technology Management Information System

    SciTech Connect (OSTI)

    Not Available

    1984-02-01

    From 1978 to 1981, the Department of Energy (DOE) awarded more than 2200 small grants worth more than $25 million to individuals, organizations and small businesses across the nation for the purposes of researching, developing and demonstrating appropriate technologies. Grants were given in the full range of technology areas, including conservation, solar, biomass, wind, geothermal, and hydro power. The final report from each DOE grantee was reviewed in an effort to extract information about new ideas and proven concepts that could be of value to the public. To manage the growing wealth of information from the grant reports, and to monitor the report review process, the Appropriate Technology Management Information System (ATMIS), a computer data base, was developed. The ATMIS can classify data into numerous categories (technology area, geographic location, project status, etc.). This manual was generated directly from the data base.

  7. Energy.gov Content Management System

    Broader source: Energy.gov [DOE]

    Energy.gov Content Management SystemEERE's websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office.

  8. Energy Management for Motor-Driven Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY Energy Management for Motor Driven Systems The energy savings network-plug into it Energy Management for Motor-Driven Systems Prepared by Gilbert A. McCoy and John G. ...

  9. emergency management systems | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    systems NNSA sites prepared for disasters using real-time response management system Pantex Emergency Services now uses the Emergency Management Information System, or EMInS. From left: Maribel Martinez, Brenda Graham and Greg Roddahl. One of NNSA's missions is emergency response, so it only makes sense that our sites and labs excel at emergency management on the local level. When... Building International Emergency Management Systems NNSA helps nations develop the core elements of an emergency

  10. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Systems Environmental Management Systems DOE uses Environmental Management Systems already in place at DOE facilities as a management framework to determine and achieve sustainability goals and targets. The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, directs agencies to continue implementation of formal EMS where those systems have

  11. Integrated Vehicle Thermal Management Systems (VTMS) Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced...

  12. Building International Emergency Management Systems | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Building International Emergency Management Systems NNSA helps nations develop the core elements of an emergency response program. Based on preliminary discussions with counterparts, NNSA develops emergency management programs with partner nations to exchange views and enhance development of effective emergency management systems. Generally, NNSA will assist foreign governments and international organizations with integration of emergency-program core

  13. Single System Image Cluster Management

    Energy Science and Technology Software Center (OSTI)

    2004-02-13

    Cluster computing has quickly proven itself to be a capable workhorse for a wide variety of production computing tasks; however, setting up and maintaining a cluster still requires significantly more effort than administrating just a single machine. As computing hardware descreases in price and cluster sizes grow, it is becoming increasingly important to manage clusters cleverly so that a system administration effort can "scale" as well. To ease the task of mananging many machines, administratorsmore » often deploy an environment that is homogeneous across all nodes of a cluster, and maintain a snapshot of the filesystem as a 'master image'. However due to operational, behavioral, and physical constraints, many nodes often require numerous deviations from the master image in order to operate as desired.« less

  14. Three-step H-P adaptve strategy for the incompressible Navier-Stokes equations

    SciTech Connect (OSTI)

    Oden, J.T.; Wu, W.; Ainsworth, M.

    1995-12-31

    Recently, a reliable a posteriori error estimate was developed, mainly based on the element residual method, for a class of steady state incompressible Navier-Stokes equations. In this paper, using this error estimate, a three-step h-p adaptive strategy is developed to solve incompressible flow problems. The goal of developing an h-p adaptive strategy is to obtain accurate approximate solutions while minimizing computational costs. The basic idea of the three-step h-p adaptive strategy is to solve for the system on the three consecutive meshes, i.e. an initial mesh, an intermediate h-p adaptive mesh, and a final h-p adaptive mesh. Each new adaptive mesh is obtained by estimating the error on the previous mesh and executing a single h- or p- refinement procedure on the previous mesh according to the results of the adaptive strategy. Numerical results indicate that the proposed three-step adaptive strategy produces accurate solutions while keeping the total computational costs under control.

  15. SES Performance Management System Policy and Operating Procedures

    Broader source: Energy.gov [DOE]

    The SES Performance Management System Policy and Operating Procedures are designed to provide the framework for DOE’s performance management system. This performance management system applies to...

  16. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ...

  17. HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers...

    Broader source: Energy.gov (indexed) [DOE]

    to comment on the new DOE rulemaking for Battery Chargers and External Power Supplies. ... HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies ...

  18. Tank waste remediation system configuration management plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  19. Assessing waste management systems using reginalt software

    SciTech Connect (OSTI)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs.

  20. A model for international border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  1. Earned Value Management System (EVMS) - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

  2. Nuclear Materials Management & Safeguards System | National Nuclear...

    National Nuclear Security Administration (NNSA)

    About Our Programs Nuclear Security Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials ...

  3. Implementing a Corporate Energy Management System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System (June 3, 2010) (2.58 MB) Presentation slides and accompanying audio (43.51 MB) More Documents & Publications Build Replication ...

  4. Building Management System Integrators | Open Energy Information

    Open Energy Info (EERE)

    Place: Berkshire, England, United Kingdom Zip: SL1 5AU Product: Service and maintenance provider. References: Building Management System Integrators1 This article is a...

  5. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center (OSTI)

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  6. Home Energy Management System - Stochastic Optimal Scheduling...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Return to Search Home Energy Management System - Stochastic Optimal Scheduling of Residential Appliances with Renewable Energy Sources National Renewable Energy Laboratory Contact ...

  7. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: ...

  8. SRNS Environmental Management System External Audit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon SRNS Environmental Management System External Audit More Documents & Publications ARRA Interfaces with the 2009 SRNS ISMS Phase 2 Verification SRNS-PROCUREMENT-CYCLE-SYSTE...

  9. Energy.gov Content Management System Webforms

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, Energy.gov's content management system (CMS) has the ability to create webforms.

  10. Energy Management Systems: Maximizing Energy Savings

    Broader source: Energy.gov [DOE]

    This webinar covered how to optimize installations of new energy management systems, review EMS strategies following lighting/HVAC retrofit projects, and utilize excess EECBG funding.

  11. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  12. Comment and Response Management System

    Energy Science and Technology Software Center (OSTI)

    1998-06-09

    CRMS is a Web-based client/server application that helps manage, track, and report on institutional responses to public comments on published documents such as environmental impact statements.

  13. Earned Value Management System RM

    Broader source: Energy.gov [DOE]

    In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital...

  14. V-144: HP Printers Let Remote Users Access Files on the Printer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: HP Printers Let Remote Users Access Files on the Printer V-144: HP Printers Let Remote Users Access Files on the Printer April 29, 2013 - 12:27am Addthis PROBLEM: HP Printers...

  15. PIA - Foreign Travel Management System (FTMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) (389.71 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  16. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Supersedes DOE G 450.4-1B and DOE G 450.3-3.

  17. U-142: HP Onboard Administrator Bugs Let Remote Users Gain Access...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: HP Onboard Administrator Bugs Let Remote Users Gain Access, Obtain Information, and Conduct URL Redirection Attacks U-142: HP Onboard Administrator Bugs Let Remote Users Gain...

  18. Integrated safety management system verification: Volume 1

    SciTech Connect (OSTI)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  19. HP Supercomputer at NREL Garners Top Honor - News Feature | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HP Supercomputer at NREL Garners Top Honor October 13, 2014 This photo shows three men in suits standing in front of a data center. GSA Administrator Dan Tangherlini (left), NREL Associate Lab Director Bryan Hannegan, and NREL Director Dan Arvizu discuss the high performance computer Peregrine during a tour of the ESIF. NREL collaborated with HP and Intel to develop the innovative warm-water, liquid-cooled supercomputer, which recently won an R&D 100 award. Peregrine is the first

  20. Methods of forming thermal management systems and thermal management methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2012-06-05

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  1. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  2. Auto-Versioning Systems Image Manager

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    The av_sys_image_mgr utility provides an interface for the creation, manipulation, and analysis of system boot images for computer systems. It is primarily intended to provide a convenient method for managing the introduction of changes to boot images for long-lived production HPC systems.

  3. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  4. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ORCA) * Excluded Parties List System (EPLS) WHAT DO I NEED TO DO? Create User ... Check email. Confirm Email. And.... NOW WHAT DO I DO? Login & Accept License Agreement Had ...

  5. Criteria for evaluating open energy management systems

    SciTech Connect (OSTI)

    Podmore, R. )

    1993-05-01

    Open Energy Management Systems can address utility needs more quickly, at lower cost while providing protection of investments and flexibility for the future. With open systems utilities will tend to incrementally upgrade rather than completely replace their EMS systems. This paper addresses: What is an open EMS What changes in electric utility industry are affecting control center design How can existing systems be upgraded to an open architecture What factors are important to open EMS designs

  6. Joint Environmental Management System (EMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The

  7. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1996-02-06

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

  8. Introduction to an Energy Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction to an Energy Management System Introduction to an Energy Management System This presentation provides an overview to energy management system (EnMS) implementation describing what an EnMS is and why an EnMS is useful. Introduction to an Energy Management System (April 19, 2012) (2.1 MB) More Documents & Publications The Do and Check Processes of an Energy Management System Planning for an Energy Management System Becoming a Certified Practitioner or a Certified Energy Engine

  9. Development of an Integrated Distribution Management System

    SciTech Connect (OSTI)

    Schatz, Joe E.

    2010-10-20

    This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

  10. South Asia Energy Management Systems Inc SAEMS | Open Energy...

    Open Energy Info (EERE)

    Energy Management Systems Inc SAEMS Jump to: navigation, search Name: South Asia Energy Management Systems, Inc. (SAEMS) Place: California Product: South Asia Energy is...

  11. Practical Ocean Energy Management Systems Inc POEMS | Open Energy...

    Open Energy Info (EERE)

    Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name: Practical Ocean Energy Management Systems Inc (POEMS) Place: San Diego, California Zip: 92138 Sector:...

  12. Concept for Management of the Future Electricity System (Smart...

    Open Energy Info (EERE)

    Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System...

  13. Guidance for FY2014 Facilities Information Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations FY 2014 FIMS Data Validation Guidance ...

  14. V-125: Cisco Connected Grid Network Management System Multiple...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am...

  15. Energy.gov Data Tables in Content Management System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Tables in Content Management System Energy.gov Data Tables in Content Management System For Office of Energy Efficiency and Renewable Energy (EERE) websites, follow these...

  16. Vol 2, Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-27

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

  17. Implementing a Corporate Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System" Steve Schultz Corporate Energy Manager 3M Presented at the U.S. Department of Energy Industrial Technologies Program June 3, 2010 Webcast 3M - Solving Problems Everywhere  Operate companies in more than 65 countries  35 international companies with manufacturing operations, 35 with laboratories  In the United States, operations in 28 states  R&D and related expenditures total $6.861 billion for the last five years  More

  18. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

  19. Systems approach to project risk management

    SciTech Connect (OSTI)

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  20. Effect of surface attractive strength on structural transitions of a confined HP lattice protein

    SciTech Connect (OSTI)

    Pattanasiri, Busara; Li, Ying Wai; Wuest, Thomas; Landau, David P

    2015-01-01

    We investigate the influence of surface attractive strength on structural transitions of a hydrophobic-polar (HP) lattice protein confined in a slit formed by two parallel, attractive walls. We apply Wang-Landau sampling together with efficient Monte Carlo updates to estimate the density of states of the system. The conformational transitions, namely, the debridging process and hydrophobic core formation, can be identified by analyzing the specific heat together with several structural observables, such as the numbers of surface contacts, the number of hydrophobic pairs, and radii of gyration in different directions. As temperature decreases, we find that the occurrence of the debridging process is conditional depending on the surface attractive strength. This, in turn, affects the nature of the hydrophobic core formation that takes place at a lower temperature. We illustrate these observations with the aid of a HP protein chain with 48 monomers.

  1. INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)

    Broader source: Energy.gov (indexed) [DOE]

    THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award...

  2. Improving Mission Execution by Integrating our Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-03

    Request for analysis and preliminary set of alternatives for the integration of management systems within DOE.

  3. Recommendation 171: Commendation for Waste Information Management System

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ORSSAB commends DOE and Florida International University for development of the Waste Information Management System.

  4. Battery management system with distributed wireless sensors

    DOE Patents [OSTI]

    Farmer, Joseph C.; Bandhauer, Todd M.

    2016-02-23

    A system for monitoring parameters of an energy storage system having a multiplicity of individual energy storage cells. A radio frequency identification and sensor unit is connected to each of the individual energy storage cells. The radio frequency identification and sensor unit operates to sense the parameter of each individual energy storage cell and provides radio frequency transmission of the parameters of each individual energy storage cell. A management system monitors the radio frequency transmissions from the radio frequency identification and sensor units for monitoring the parameters of the energy storage system.

  5. Data management system for organic soil

    SciTech Connect (OSTI)

    Stinnette, P.

    1999-07-01

    A Data Management System for Organic Soil (DMSOS) has been developed that enables the acquisition, management and analysis of organic soil data as well as the presentation of results to be conducted effectively through a common interface. This development was in response to the data management needs of research investigating the engineering properties of organic soil and its extension to the stabilization of organic soil through dynamic replacement (DR). It is shown how the above functions are implemented efficiently using Windows-based software to perform comprehensive data management and analysis of data gathered from both laboratory and field tests. When the engineering properties of a given organic soil deposit are needed, a build-in Computer Advisor for Organic Soil Projects (CAOSP) predicts the properties from DMSOS based correlations. A unique and useful feature of the CAOSP is its ability to estimate the anticipated ultimate settlement of an organic soil deposit given the loading conditions and the moisture or organic content. Also incorporated in the DMSOS is a quality control system that utilizes computerized data acquisition/data management techniques in order to evaluate the degree of improvement of an organic soil layer at a given stage of treatment using DR.

  6. Environmental remediation and waste management information systems

    SciTech Connect (OSTI)

    Harrington, M.W.; Harlan, C.P.

    1993-12-31

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  7. Optimal management of batteries in electric systems

    DOE Patents [OSTI]

    Atcitty, Stanley; Butler, Paul C.; Corey, Garth P.; Symons, Philip C.

    2002-01-01

    An electric system including at least a pair of battery strings and an AC source minimizes the use and maximizes the efficiency of the AC source by using the AC source only to charge all battery strings at the same time. Then one or more battery strings is used to power the load while management, such as application of a finish charge, is provided to one battery string. After another charge cycle, the roles of the battery strings are reversed so that each battery string receives regular management.

  8. Pre-Validated Signal Database Management System

    Energy Science and Technology Software Center (OSTI)

    1996-12-18

    SPRT/DBMS is a pre-validated experimental database management system for industries where large volumes of process signals are acquired and archived. This system implements a new and powerful pattern recognition method, the spectrum transformed sequential testing (STST or ST2) procedure. A network of interacting ST2 modules deployed in parallel is integrated with a relational DBMS to fully validate process signals as they are archived. This reliable, secure DBMS then provides system modelers, code developers, and safetymore » analysts with an easily accessible source of fully validated process data.« less

  9. Managing Design and Construction Using Systems Engineering for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A by Roland Frenck Functional areas: Construction and Engineering, Program Management This...

  10. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  11. Contractor Earned Value Management System Certification Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contractor Earned Value Management System Certification Status Contractor Earned Value Management System Certification Status Certification Status for major EM Contracts Contractor Earned Value Management System Certification Status (129.04 KB) More Documents & Publications Department of Energy Earned Value Management Survey Results VPP Participant Status EM Major Contracts Awarded Since 2006

  12. Electronic Document Management System PIA, BechtelJacobs Company, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC (239.76 KB) More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC

  13. DOCS System Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering project, can be used as a template to facilitate the creation of the CMP for your particular project. DOCS System Configuration Management Plan (654.98 KB) More Documents & Publications OPC Security Whitepaper #3Hardening Guidelines for OPC Hosts NMMSS Software Quality Assurance Plan ABB SCADA/EMS System INEEL

  14. Nuclear Materials Management and Safeguards System (NMMSS)

    SciTech Connect (OSTI)

    Jacobsen, S.E.; Matthews, W.B. III; McKamy, E.D.; Pedigo, R.B. )

    1991-01-01

    This paper describes the Nuclear Materials Management and Safeguards System (NMMSS) which is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The system serves national security and program management interests, and international interests in the programs for the peaceful application of nuclear energy and non-proliferation of nuclear weapons. Within the scope of the NMMSS are found all nuclear materials applied and controlled under United States law and related international agreements, including U.S. nuclear materials production programs and U.S. private nuclear industrial activities. In addition, its national and international scope enables it to provide services to other organizations such as the Arms Control and Disarmament Agency, the Department of State, and the U.S. Congress.

  15. Best Management Practice #8: Steam Boiler Systems | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Steam Boiler Systems Best Management Practice 8: Steam Boiler Systems Steam boilers are commonly used in large heating systems, institutional kitchens, or in facilities where ...

  16. PIA - Human Resources Management System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    System PIA - Human Resources Management System (218.23 KB) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information ...

  17. System and method for advanced power management

    DOE Patents [OSTI]

    Atcitty, Stanley; Symons, Philip C.; Butler, Paul C.; Corey, Garth P.

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  18. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility. Signature of Authorized Official Date

  19. Information System Security Manager (ISSM) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manager (ISSM) Information System Security Manager (ISSM) macbook-925595_960_720.jpg The Information Security System Manager (ISSM) is designated by an operating unit's (DOE organization or site) Senior Manager to manage the unit's cyber security program. The ISSM establishes, documents, and monitors an operating unit's cyber security program implementation plan, and ensures compliance with DOE management policies. Candidates must possess a working knowledge of cyber security policies and

  20. V-166: HP-UX Directory Server Discloses Passwords to Remote Authentica...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: HP-UX Directory Server Discloses Passwords to Remote Authenticated and Local Users V-166: HP-UX Directory Server Discloses Passwords to Remote Authenticated and Local Users May...

  1. HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies

    Broader source: Energy.gov [DOE]

    Hewlett-Packard Company (HP) appreciates the opportunity to comment on the new DOE rulemaking for Battery Chargers and External Power Supplies. Thank you for taking the time to speak with us. HP...

  2. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE (299.08 KB) More Documents & Publications PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  3. HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Supplies | Department of Energy HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies Hewlett-Packard Company (HP) appreciates the opportunity to comment on the new DOE rulemaking for Battery Chargers and External Power Supplies. Thank you for taking the time to speak with us. HP believes that existing voluntary Market Access Requirements, such as EPEAT and ENERGY

  4. U-135: HP WBEM Discloses Diagnostic Data to Remote and Local Users

    Broader source: Energy.gov [DOE]

    Two vulnerabilities were reported in HP WBEM. A remote or local user can gain access to diagnostic data.

  5. U-017: HP MFP Digital Sending Software Lets Local Users Obtain Potentially Sensitive Information

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in HP MFP Digital Sending Software. A local user can obtain potentially sensitive information.

  6. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  7. V-174: RSA Authentication Manager Writes Operating System, SNMP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files V-174: RSA Authentication Manager Writes Operating System,...

  8. Civilian Radioactive Waste Management System Requirements Document

    SciTech Connect (OSTI)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  9. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  10. V-132: IBM Tivoli System Automation Application Manager Multiple

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vulnerabilities | Department of Energy 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security

  11. Understanding and managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.; Lim, J.; Murphy, M.; Wyss, G.

    1995-07-01

    When software is used in safety-critical, security-critical, or mission-critical situations, it is imperative to understand and manage the risks involved. A risk assessment methodology and toolset have been developed which are specific to software systems. This paper describes the concepts of the methodology, with emphasis on the experience of designing a toolset to support the methodology. Also presented are results of applying the methodology to two real software-based products: the software toolset itself, and a network firewall.

  12. Stand Alone Battery Thermal Management System

    SciTech Connect (OSTI)

    Brodie, Brad

    2015-09-30

    The objective of this project is research, development and demonstration of innovative thermal management concepts that reduce the cell or battery weight, complexity (component count) and/or cost by at least 20%. The project addresses two issues that are common problems with current state of the art lithium ion battery packs used in vehicles; low power at cold temperatures and reduced battery life when exposed to high temperatures. Typically, battery packs are “oversized” to satisfy the two issues mentioned above. The first phase of the project was spent making a battery pack simulation model using AMEsim software. The battery pack used as a benchmark was from the Fiat 500EV. FCA and NREL provided vehicle data and cell data that allowed an accurate model to be created that matched the electrical and thermal characteristics of the actual battery pack. The second phase involved using the battery model from the first phase and evaluate different thermal management concepts. In the end, a gas injection heat pump system was chosen as the dedicated thermal system to both heat and cool the battery pack. Based on the simulation model. The heat pump system could use 50% less energy to heat the battery pack in -20°C ambient conditions, and by keeping the battery cooler at hot climates, the battery pack size could be reduced by 5% and still meet the warranty requirements. During the final phase, the actual battery pack and heat pump system were installed in a test bench at DENSO to validate the simulation results. Also during this phase, the system was moved to NREL where testing was also done to validate the results. In conclusion, the heat pump system can improve “fuel economy” (for electric vehicle) by 12% average in cold climates. Also, the battery pack size, or capacity, could be reduced 5%, or if pack size is kept constant, the pack life could be increased by two years. Finally, the total battery pack and thermal system cost could be reduced 5% only if the

  13. Energy Management Systems Package for Small Commercial Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Package for Small Commercial Buildings Energy Management Systems Package for Small ... Heat Pump - 2013 Peer Review Buildings Performance Database - 2013 BTO Peer

  14. Energy Management and Information Systems Study - 2014 BTO Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Information Systems Study - 2014 BTO Peer Review Energy Management and Information Systems Study - 2014 BTO Peer Review Presenter: Jessica Granderson, Lawrence Berkeley ...

  15. PIA - HSS Electronic Visitor Management System (HSEVMS) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho ...

  16. Legacy system retirement plan for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Adams, D.E.

    1998-09-29

    The implementation of the Business Management System (BMS) will replace a number of systems currently in use at Hanford. These systems will be retired when the replacement is complete and the data from the old systems adequately stored and/or converted to the new system. The replacement is due to a number of factors: (1) Year 2000 conversion: Most of the systems being retired are not year 2000 compliant. Estimates on making these systems compliant approach the costs of replacing with the enterprise system. (2) Many redundant custom-made systems: Maintenance costs on the aging custom developed systems is high. The systems also have overlapping functionality. Replacement with an enterprise system is expected to lower the maintenance costs. (3) Shift inefficient/complex work processes to commercial standards: Many business practices have been developed in isolation from competitive pressures and without a good business foundation. Replacement of the systems allows an opportunity to upgrade the business practices to conform to a market driven approach. (4) Questionable legacy data: Significant amount of data contained within the legacy systems is of questionable origin and value. Replacement of the systems allows for a new beginning with a clean slate and stronger data validation rules. A number of the systems being retired depend on hardware and software technologies that are no longer adequately supported in the market place. The IRM Application Software System Life Cycle Standards, HNF-PRO-2778, and the Data Systems Review Board (DSRB) define a system retirement process which involves the removal of an existing system from active support or use either by: ceasing its operation or support; or replacing it with a new system; or replacing it with an upgraded version of the existing system. It is important to note, that activities associated with the recovery of the system, once archived, relates to the ability for authorized personnel to gain access to the data and

  17. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Mohr, Joseph J.; Barkhouse, Wayne; Beldica, Cristina; Bertin, Emmanuel; Dora Cai, Y.; Nicolaci da Costa, Luiz A.; Darnell, J.Anthony; Daues, Gregory E.; Jarvis, Michael; Gower, Michelle; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

    2008-07-01

    The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  18. LED lamp power management system and method

    DOE Patents [OSTI]

    Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

    2013-03-19

    An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

  19. Enterprise Assessments Targeted Review of the Safety System Management of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 | Department of Energy System Management of the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 Enterprise Assessments Targeted Review of the Safety System Management of the Secondary Confinement System and Power

  20. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  1. Departmental Integrated Safety Management System (9-23-10)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-23

    This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

  2. Project Management and Systems Support | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Project Management and Systems Support Goal NNSA strives to ensure that its projects are well managed, and receive appropriate visibility and support within its headquarters programs. Additionally, it works to improve project management policies and practices throughout NNSA. Means and Strategies NNSA will accomplish this goal by providing its federal project directors, federal and contractor program managers, and other key project management personnel with: 1)

  3. Cryptographic Trust Management System Design Document

    SciTech Connect (OSTI)

    Edgar, Thomas W.; Clements, Samuel L.; Hadley, Mark D.; Maiden, Wendy M.; Manz, David O.; Zabriskie, Sean J.

    2010-08-04

    Deliverable for DOE NSTB Cryptographic Trust Management project. Design document to follow the Requirements document submitted in Sept 2009.

  4. Energy Management for Motor-Driven Systems

    Broader source: Energy.gov [DOE]

    This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

  5. Energy Management for Motor Driven Systems

    SciTech Connect (OSTI)

    2000-02-01

    This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

  6. Battery Thermal Management System Design Modeling

    SciTech Connect (OSTI)

    Pesaran, A.; Kim, G. H.

    2006-11-01

    Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

  7. Waste Information Management System-2012 - 12114

    SciTech Connect (OSTI)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.; Roelant, D.

    2012-07-01

    The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has

  8. Energy management system for a rotary machine and method therefor

    DOE Patents [OSTI]

    Bowman, Michael John; Sinha, Gautam; Sheldon, Karl Edward

    2004-11-09

    In energy management system is provided for a power generating device having a working fluid intake in which the energy management system comprises an electrical dissipation device coupled to the power generating device and a dissipation device cooling system configured to direct a portion of a working fluid to the electrical dissipation device so as to provide thermal control to the electrical dissipation device.

  9. Spent Nuclear Fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-03

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  10. Energy.gov Content Management System Requirements and Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Energy.gov Content Management System Requirements and Guidance Energy.gov Content Management System Requirements and Guidance The Office of Energy Efficiency and Renewable Energy's (EERE's) websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office. Learn more about Energy.gov's Drupal CMS requirements and guidance for: Page types Block types Linking File naming conventions Optimizing

  11. Guidance for FY2014 Facilities Information Management System Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validations | Department of Energy FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations FY 2014 FIMS Data Validation Guidance w MEMO.pdf (10.9 MB) More Documents & Publications Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations Deputy Secretary Memo on Improving DOE-wide Recruitment and Hiring Processes FY2012 Three

  12. Voices of Experience | Advanced Distribution Management Systems_brochure.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insights into Advanced Distribution Management Systems VOICES of Experience February, 2015 Prepared for the U.S. Department of Energy by the National Renewable Energy Laboratory under contract No. DE-AC36-08G028308, Subtask SG10.1011 in conjunction with Energetics Incorporated under contract No. GS-10F-0103J, Subtask J3806.0002. INSIGHTS INTO ADVANCED DISTRIBUTION MANAGEMENT SYSTEMS | DOE 3 Voices of Experience | Advanced Distribution Management Systems When people think of the electric power

  13. Integrating Environmental, Safety, and Quality Management System Audits |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Integrating Environmental, Safety, and Quality Management System Audits Integrating Environmental, Safety, and Quality Management System Audits August 2009 Presenter: David Skipper, UT-Battelle Track 7-2 Topics Covered: External registration/validation of management systems is desirableUT-Battelle registrations ISO 9001 for isotope development process ISO 14001 for all UT-Battelle activities OHSAS 18001 for all UT-Battelle activities ISO 17025 for metrology laboratory

  14. ISO 50001 Conformant Energy Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISO 50001 Conformant Energy Management Systems ISO 50001 Conformant Energy Management Systems Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review commlbldgs04_mckane_040213.pdf (1.09 MB) More Documents & Publications Becoming a Certified Practitioner or a Certified Energy Engineer The Do and Check Processes of an Energy Management System Superior Energy Performance: Getting the Most Value from ISO 50001

  15. Aging Management Program for Stainless Steel Dry Storage System Canisters

    SciTech Connect (OSTI)

    Dunn, Darrell S.; Lin, Bruce P.; Meyer, Ryan M.; Anderson, Michael T.

    2015-06-01

    This is a conference paper presenting an aging management program for stainless steel dry storage system canisters. NRC is lead author of paper. PNNL provided input.

  16. Energy.gov Content Management System Data Tables

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, follow these guidelines for creating Section 508-compliant data tables in the Energy.gov content management system.

  17. Energy.gov Content Management System Block Types

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, learn about the variety of block types available in the Energy.gov Drupal content management system (CMS).

  18. Effects of Home Energy Management Systems on Distribution Utilities...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... For operational management to support the distribution system, the utility's consumers (e.g., homeowners) need to be provided financial incentives. Historically, demand-response ...

  19. Title 40 CFR 260: Hazardous Waste Management System: General...

    Open Energy Info (EERE)

    : Hazardous Waste Management System: General Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 260: Hazardous...

  20. Wireless Battery Management System for Safe High-Capacity Energy...

    Office of Scientific and Technical Information (OSTI)

    Wireless Battery Management System for Safe High-Capacity Energy Storage Citation Details ... Sponsoring Org: USDOE Country of Publication: United States Language: English Subject: 25 ...

  1. Independent Oversight Review of Management of Safety Systems...

    Office of Environmental Management (EM)

    Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and ... of Safety, Health and Quality DWOL Duty Waste Operations Lead EM Office of Environmental ...

  2. Office of Personnel Management (OPM) Billing System PIA, Office...

    Office of Environmental Management (EM)

    More Documents & Publications PIA - Security Clearance Work Tracking and Budget System Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Manchester ...

  3. Meeting Minutes from Automated Home Energy Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automated Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 ... Computing (Web Data Computing, Data Storage) Trends - Troy Batterberry, Microsoft ...

  4. PIA - EERE Infrastructure-EERE Reviewer Management System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System PIA - Bonneville Power Adminstration Ethics ...

  5. Mercury-metadata data management system

    Energy Science and Technology Software Center (OSTI)

    2008-01-03

    Mercury is a federated metadata harvesting, search and retrieval tool based on both open source software and software developed at Oak Ridge National Laboratory. It was originally developed for NASA, USGS, and DOE. A major new version of Mercury (version 3.0) was developed during 2007 and released in early 2008. This Mercury 3.0 version provides orders of magnitude improvements in search speed, support for additional metadata formats, integration with Google Maps for spatial queries, facettedmore » type search, support for RSS delivery of search results, and ready customization to meet the needs of the multiple projects which use Mercury. For the end users, Mercury provides a single portal to very quickly search for data and information contained in disparate data management systems. It collects metadata and key data from contributing project servers distributed around the world and builds a centralized index. The Mercury search interfaces then allow the users to perform simple, fielded, spatial, and temporal searches across these metadata sources. This centralized repository of metadata with distributed data sources provides extremely fast search results to the user, while allowing data providers to advertise the availability of their data and maintain complete control and ownership of that data.« less

  6. Data Management and Acquisition System for INAA

    SciTech Connect (OSTI)

    Donald J. Ondov; John M. Ondov

    1998-12-31

    Instrumental neutron activation analysis (INAA) remains a powerful technique for multielemental trace analysis. In atmospheric aerosol studies, we typically determine 40 elements, including markers of natural and anthropogenic sources, heavy metals, and toxic or nutrient trace elements in aerosol samples. The need for size spectral, spatial, and temporal information requires that hundreds of samples be collected and accurately analyzed. Quality assurance is a primary component of the analytical protocol. The quality of INAA data depends on counting statistics--accurate preparation of standards, positioning of samples above the detector, resolution of interferences, and correction for coincidence effects when counting close to the detector--and on reliable operation of the amplifier and analog-to-digital converters. Furthermore, the analysis of such large numbers of samples by INAA is a complicated endeavor, involving a large number of tasks that, if not recorded or completed properly, can compromise the analysis. To reduce the possibility of operator error in keeping track of a complex array of information and to speed the detection of instrumental faults, we have developed a new analysis protocol and automated sample analysis and management (SAM) software system. The SAM system is a relational database application designed to log data associated with the collection of atmospheric aerosol and associated samples collected with a variety of instruments, assist in choosing samples for analysis by a variety of techniques, schedule irradiation and counting for INAA, interface with the ORTEC Gamma Vision (GV) software, capture the analytical data, calculate elemental masses from activities provided by GV, and prepare first-tier data summaries and manipulations. All the sample and flux monitor counts are initiated through SAM.

  7. ISO 50001 Conformant Energy Management Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Building Pilots GaTech Energy Management Coaching LBNL Technical & Program Strategy DOE ... Experts * EnMS Implementation Coaching, Training, Tools * Document Review & ...

  8. Enforcement Policy Statement: Off Mode Standards for CAC/HP | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Policy Statement: Off Mode Standards for CAC/HP Enforcement Policy Statement: Off Mode Standards for CAC/HP July 8, 2014 DOE will not seek civil penalties for violation of the off mode electrical power consumption standard for central air conditioners or central air conditioning heat pumps (CAC/HP) until 180 days following publication of a final rule establishing a test method for measuring off mode electrical power consumption for CAC/HP. Enforcement Policy: Off Mode Standards for

  9. V-210: HP LaserJet Pro Printer Bug Lets Remote Users Access Data

    Broader source: Energy.gov [DOE]

    A potential security vulnerability has been identified with certain HP LaserJet Pro printers. The vulnerability could be exploited remotely to gain unauthorized access to data.

  10. T-590: HP Diagnostics Input Validation Hole Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    A potential security vulnerability has been identified in HP Diagnostics. The vulnerability could be exploited remotely resulting in cross site scripting (XSS).

  11. U-275: HP IBRIX X9000 Storage Discloses Information to Remote Users

    Broader source: Energy.gov [DOE]

    A potential security vulnerability has been identified with HP IBRIX X9000 Storage. The vulnerability could be remotely exploited to allow disclosure of information.

  12. T-608: HP Virtual Server Environment Lets Remote Authenticated Users Gain Elevated Privileges

    Broader source: Energy.gov [DOE]

    A potential security vulnerability has been identified in HP Virtual Server Environment for Windows. The vulnerability could be exploited remotely to elevate privileges.

  13. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    SciTech Connect (OSTI)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list.

  14. Absolute properties of the triple star HP Aurigae

    SciTech Connect (OSTI)

    Lacy, Claud H. Sandberg; Burks, Charles L.; Torres, Guillermo; Wolf, Marek E-mail: clburks@email.uark.edu E-mail: wolf@cesnet.cz

    2014-01-01

    New photometric, spectroscopic, and eclipse timing observations of the eclipsing binary star HP Aur allow for very accurate orbital determinations, even in the presence of a third body and transient starspot activity. The eclipsing binary masses are determined to an accuracy of ±0.4% and the radii to ±0.6%. The masses are 0.9543 ± 0.0041 and 0.8094 ± 0.0036 solar masses, and the radii are 1.0278 ± 0.0042 and 0.7758 ± 0.0034 solar radii, respectively. The orbital period in the outer orbit is accurately determined for the first time: 4.332 ± 0.011 yr. A comparison with current theories of stellar evolution shows that the components' absolute properties can be well-matched by the current models at an age of about 7 billion years.

  15. A Unix Print Filter for Controlling an HP Laserjet Printer

    SciTech Connect (OSTI)

    Hoffman, F.M.

    1992-01-01

    This report describes a Unix print filter designed to control an Hewlett Packard Laserjet or other printer that uses Hewlett Packard's Printer Control Language (HP-PCL). The filter gives users the ability to control print pitch, orientation, and indentation by using standard flags to the Unix lpr command or multiple entries in the /etc/printcap file and allows both ascii and binary (i.e., graphics and down-loadable fonts) files to be printed. Additionally, the filter provides some accounting capability. The supported print pitch and orientation options are described, as are the different configuration options. The code for the filter is included in Appendix A and sample entries for the /etc/printcap file are included in Appendix B and C.

  16. Recommended Practice for Patch Management of Control Systems

    SciTech Connect (OSTI)

    Steven Tom; Dale Christiansen; Dan Berrett

    2008-12-01

    A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

  17. Software Configuration Management Plan for the Sodium Removal System

    SciTech Connect (OSTI)

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  18. Managing Aging Effects on Dry Cask Storage Systems for Extended...

    Office of Environmental Management (EM)

    dry cask storage system designs; and 4) AMPs and TLAAs for the SSCs that are important to safety in the DCSS designs. PDF icon Managing Aging Effects on Dry Cask Storage Systems...

  19. T-570: HP Security Bulletin- HP-UX Running OpenSSL, Remote Execution of Arbitrary Code, Denial of Service (DoS), Authentication Bypass

    Broader source: Energy.gov [DOE]

    A potential security vulnerability has been identified with HP-UX OpenSSL. This vulnerability could be exploited remotely to execute arbitrary code or create a Denial of Service (DoS) or an authentication bypass.

  20. Integrated Safety & Environmental Management System | Stanford Synchrotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Lightsource Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation

  1. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  2. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  3. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  4. Guidance for Fiscal Year 2015 Facilities Information Management System Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validations | Department of Energy Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FIMS VALIDATION GUIDANCE_FY 2015 with MEMO 141120 FINAL.pdf (1.46 MB) More Documents & Publications Microsoft PowerPoint - FY09_10 Validations_Archiving_090804 Three-year Rolling Timeline Three

  5. Process for Managing and Customizing HPC Operating Systems

    SciTech Connect (OSTI)

    Brown, David ML

    2014-04-02

    A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.

  6. Plant perspective on electronic document management systems for process safety management programs

    SciTech Connect (OSTI)

    Mannan, M.; Lee, W.S. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-08-01

    As mandated by the Clean Air Act Amendments of 1990, the Occupational Safety and Health Administration (OSHA) promulgated on February 24, 1992 the Process Management (PSM) rule: 29 CFR 1910.119. Compliance with the PSM requirements is causing a significant impact on both financial resources and manpower for the covered facilities. A major portion of the efforts have been concentrated on developing and compiling a vast amount of data in various formats (i.e., autocad, word processing, and numeric databases). Because of the need to access and revise these data on a continuous basis, many facilities have started to implement computer-based document management systems to store, manage, and maintain these data. This paper provides a plant perspective of the necessary features and characteristics of a computer-based document management system. An electronic document management system can also form the basis for a plant workflow system. Once, all the information related to a plant`s PSM program are inputted into the system, it is possible to control the plant workflow using the management of change system and maintenance work requests. Other key issues that must be included in a computer-based system are redlining capabilities, execution of management of change authorization, and interfacing with existing computer programs (many plants are already using different kinds of software for a variety of objectives). This paper provides a roadmap for the development and implementation of an electronic document management system.

  7. SES Performance Management System Plan Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon FY2016 SES Performance Management Training.pdf Responsible Contacts Keidra Biddiex Human Resources Specialist E-mail Keidra.Biddiex@hq.doe.gov Phone (202) 586-7693 Deanna ...

  8. Open energy management systems as a tool for competition

    SciTech Connect (OSTI)

    Podmore, R.

    1995-10-01

    Energy Management Systems (EMSs) have been called the nerve center for an electric utility. These systems have the capacity to monitor the electrical grid by retrieving tens of thousands of MW/MVar flows, voltages and breaker/switch positions every few seconds. With data interchange agreements utilities can also monitor performance of neighboring systems. System dispatchers need to access more and more information sources and their job is becoming more complicated. Other departments need to access EMS related data and work more closely with system dispatch. To date, the role of Energy Management Systems has not been affected significantly by the prospect of competition. With the clean air act, emission allowance trading, open transmission access, and potential for customer choice it is likely that Energy Management Systems will play a more strategic business role in the future. In particular, Open Energy Management Systems that allow the utility the freedom to select applications from multiple vendors will have special advantages. This paper will address potential areas, where an Open Energy Management System can be used to obtain a competitive edge. It will also outline how competition is likely to affect Energy Management System architectures and procurement practices.

  9. NO2 Management in Diesel Exhaust System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NO2 Management in Diesel Exhaust System NO2 Management in Diesel Exhaust System The project discusses the use of an NO2 mitigator for catalytic NO2 reduction deer09_roberts.pdf (199.46 KB) More Documents & Publications Non-Petroleum-Based Fuels: Effects on Emissions Control Technologies Low Temperature Catalyst for Fuel Injection System Leading Edge Technology in Diesel Emissions Control

  10. Global Energy Management System Implementation: General Dynamics Case Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Global Energy Management System Implementation: Case Study 1 USA, Superior Energy Performance Defense contractor improves energy performance nearly 12%, achieving a six-month payback and earning Gold- level certification by Superior Energy Performance Business Benefits Achieved General Dynamics Ordnance and Tactical Systems (GD-OTS) worked with the U.S. Department of Energy's Advanced Manufacturing Office to successfully implement an energy management system (EnMS) at a federal ammunition plant

  11. Computerized map-based information management system for natural resource management

    SciTech Connect (OSTI)

    Miller, K.

    1995-12-01

    Federal agencies, states and resource managers have control and stewardship responsibility over a significant inventory of natural resources. A number of federal regulations require the review, protection and preservation of natural resource protection. Examples of such actions include the reauthorization of the Clean Water Act and the modification of the National Contingency Plan to incorporate the requirements of the Oil Pollution Act of 1990. To successfully preserve conserve and restore natural resources on federal reservations, and state and private lands, and to comply with Federal regulations designed to protect natural resources located on their sites, and the type of information on these resources required by environmental regulations. This paper presents an approach using a computerized, graphical information management system to catalogue and track data for the management of natural resources under Federal and state regulations, and for promoting resource conservation, preservation and restoration. The system is designed for use by Federal facility resource managers both for the day-to-day management of resources under their control, and for the longer-term management of larger initiatives, including restoration of significant or endangered resources, participation in regional stewardship efforts, and general ecosystem management. The system will be valuable for conducting natural resource baseline inventories an implementing resource management plans on lands other than those controlled by the Federal government as well. The system can provide a method for coordinating the type of natural resource information required by major federal environmental regulations--thereby providing a cost-effective means for managing natural resource information.

  12. Tank waste remediation system configuration management implementation plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  13. Quality Management Systems for Zero Energy Ready Home Webinar (Text

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Version) | Department of Energy Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014. Watch the presentation. GoToWebinar voice: The broadcast is now starting. All attendees are in listen-only mode. Lindsay Parker: Hi, everyone. We're really glad that you can make it here

  14. An evaluation of the management system verification pilot at Hanford

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    1998-11-12

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview.

  15. Advanced Management of Compressed Air Systems

    Broader source: Energy.gov [DOE]

    Find out how a compressed air system works and the benefits of optimal compressed air system performance. This training is designed to help end users as well as industry solution providers learn...

  16. Quality Management System Guidelines- Building America Top Innovation

    Broader source: Energy.gov [DOE]

    Quality management system tools were customized for residential construction by BSC, IBACOS, and PHI, for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework.

  17. V-132: IBM Tivoli System Automation Application Manager Multiple...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System ...

  18. An Integrated Waste Management System and a Consent-Based

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    An Integrated Waste Management System and a Consent-Based Approach to Siting Consent-Based Siting Initiative Kick-Off Meeting Renaissance Washington, DC Downtown Hotel January 20, ...

  19. The Bureau of Land Management's Well Information System (WIS...

    Open Energy Info (EERE)

    Bureau of Land Management's Well Information System (WIS) How-To Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  20. Building International Emergency Management Systems | National...

    National Nuclear Security Administration (NNSA)

    Generally, NNSA will assist foreign governments and international organizations with integration of emergency-program core elements, including communications systems, networks and ...

  1. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  2. Freescale Semiconductor Successfully Implements an Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Freescale Semiconductor Successfully Implements an Energy Management System Freescale Semiconductor Successfully Implements an Energy Management System This case study describes how Freescale Semiconductor implemented projects at its Oak Hill Fab plant in Austin, Texas, that reduced annual plant-wide energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than

  3. Environmental Management System Steering Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members of the Laboratory's Executive Council on environmentally-related objects and targets to help meet the Laboratory's and DOE's sustainability goals. For more information please see http://www.ameslab.gov/operations/esha/environmental EMS Charter The current members of the committee include David Byrd (Science and

  4. Best Management Practice #8: Steam Boiler Systems

    Office of Energy Efficiency and Renewable Energy (EERE)

    Boilers and steam generators are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size, the amount of steam used, and the amount of condensate returned.

  5. Chemical Biological Emergency Management Information System

    Energy Science and Technology Software Center (OSTI)

    2004-06-15

    CB-EMIS is designed to provide information and analysis to transit system operators and emergency responders in the event of a chemical attack on a subway system. The software inforporates detector data, video images, train data, meteorological data, and above- and below-ground plume dispersion models, hight of the liquid level.

  6. The Integrated Waste Tracking System - A Flexible Waste Management Tool

    SciTech Connect (OSTI)

    Anderson, Robert Stephen

    2001-02-01

    The US Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) has fully embraced a flexible, computer-based tool to help increase waste management efficiency and integrate multiple operational functions from waste generation through waste disposition while reducing cost. The Integrated Waste Tracking System (IWTS)provides comprehensive information management for containerized waste during generation,storage, treatment, transport, and disposal. The IWTS provides all information necessary for facilities to properly manage and demonstrate regulatory compliance. As a platformindependent, client-server and Web-based inventory and compliance system, the IWTS has proven to be a successful tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of management flexibility.

  7. Spent nuclear fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C., Westinghouse Hanford

    1996-07-19

    The purpose of this document is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices. The methodology promotes and ensures sound management of the SNF Project. The scope of the document encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project including risk management process, design authority/design agent concept, and documentation responsibilities. This implementation applies to, and is tailored to the needs of the SNF Project and all its Subprojects, including all current and future Subprojects.

  8. An Integrated Waste Management System and a Consent-Based

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    An Integrated Waste Management System and a Consent-Based Approach to Siting Consent-Based Siting Initiative Kick-Off Meeting Renaissance Washington, DC Downtown Hotel January 20, 2016 1:00-1:15 PM Keynote Speaker: Finding Long-Term Solutions for Managing Our Nation's Nuclear Waste Dr. Lynn Orr, Undersecretary for Science and Energy, Department of Energy 1:15-1:50 PM Panel Discussion: Updates on DOE Planning for an Integrated Waste Management System and Discussion of Engagement Opportunities in

  9. Establishing functional requirements for emergency management information systems

    SciTech Connect (OSTI)

    Reed, J.H.; Rogers, G.O.; Sorensen, J.H.

    1991-01-01

    The advancement of computer technologies has led to the development of a number of emergency management information systems (e.g., EIS, CAMEO, IEMIS). The design of these systems has tended to be technologically driven rather than oriented to meeting information management needs during an emergency. Of course, emergency management needs vary depending on the characteristics of the emergency. For example, in hurricanes, onset is typically slow enough to allow emergency managers to simulate evacuations dynamically while in chemical disasters onset may be sufficiently rapid to preclude such simulation(s). This paper describes a system design process in which the analysis of widely recognized emergency management functions was used to identify information requirements and the requisite software and hardware capabilities to deal with rapid onset, low probability, high consequence events. These requirements were then implemented as a prototype emergency management system using existing hardware and software to assure feasibility. Data, hardware, and software requirements were further developed, refined, and made more concrete through an iterative prototyping effort. This approach focuses attention directly on meeting emergency management information needs while avoiding unneeded technological innovations. 10 refs., 4 figs., 1 tab.

  10. Small Water System Management Program: 100 K Area

    SciTech Connect (OSTI)

    Hunacek, G.S. Jr.

    1995-06-29

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site`s 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410.

  11. Requirements Management System Browser (RMSB) software design description

    SciTech Connect (OSTI)

    Frank, D.D.

    1996-09-30

    The purpose of this document is to provide an ``as-built`` design description for the Requirements Management System Browser (RMSB) application. The Graphical User Interface (GUI) and database structure design are described for the RMSB application, referred to as the ``Browser.`` The RMSB application provides an easy to use PC-based interface to browse systems engineering data stored and managed in a UNIX software application. The system engineering data include functions, requirements, and architectures that make up the Tank Waste Remediation System (TWRS) technical baseline.

  12. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  13. Power Contro Energy Management and Market Systems

    SciTech Connect (OSTI)

    Tom Addison; Andrew Stanbury

    2005-12-15

    More efficient use of the nation's electrical energy infrastructure will result in minimizing the cost of energy to the end user. Using real time electrical market information coupled with defined rules, market opportunities can be identified that provide economic benefit for both users and marketers of electricity. This report describes the design of one such system and the features a fully functional system would provide. This report documents several investigated methods of controlling load diversity or shifting.

  14. Complexed Adsorbed HP1 HP1 L2 L7 L7 L7 L2 H3 H3 National Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complexed Adsorbed HP1 HP1 L2 L7 L7 L7 L2 H3 H3 National Energy Research Scientific Computing Center 2011 Annual Report Ernest Orlando Lawrence Berkeley National Laboratory 1 Cyclotron Road, Berkeley, CA 94720-8148 This work was supported by the Director, Office of Science, Office of Advanced Scientific Computing Research of the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. National Energy Research Scientific Computing Center 2011 Annual Report The Year in Perspective Research

  15. Management system saves Brooklyn Union $1 million/year

    SciTech Connect (OSTI)

    1995-04-01

    This paper reviews the information system developed for Brooklyn Union Gas Co. to reduce staff and improve performance in its utility business. It reviews the hardware systems and software codes to manage the various geographical information. The system runs UNIX-based CAD software. The paper also reviews the networking of the various information systems and the ability to interact with both PC and workstation components.

  16. Hybrid electric vehicle power management system

    SciTech Connect (OSTI)

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  17. Lighting system with thermal management system having point contact synthetic jets

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Kuenzler, Glenn Howard; Wolfe, Jr, Charles Franklin; Sharma, Rajdeep

    2016-08-30

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system includes a plurality of synthetic jets. The synthetic jets are arranged within the lighting system such that they are secured at contact points.

  18. Lighting system with thermal management system having point contact synthetic jets

    SciTech Connect (OSTI)

    Arik, Mehmet; Weaver, Stanton Earl; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Sharma, Rajdeep

    2013-12-10

    Lighting system having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system includes a plurality of synthetic jets. The synthetic jets are arranged within the lighting system such that they are secured at contact points.

  19. Lighting system with thermal management system having point contact synthetic jets

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Sharma, Rajdeep

    2016-08-23

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system includes a plurality of synthetic jets. The synthetic jets are arranged within the lighting system such that they are secured at contact points.

  20. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  1. Statistical tools for prognostics and health management of complex systems

    SciTech Connect (OSTI)

    Collins, David H; Huzurbazar, Aparna V; Anderson - Cook, Christine M

    2010-01-01

    Prognostics and Health Management (PHM) is increasingly important for understanding and managing today's complex systems. These systems are typically mission- or safety-critical, expensive to replace, and operate in environments where reliability and cost-effectiveness are a priority. We present background on PHM and a suite of applicable statistical tools and methods. Our primary focus is on predicting future states of the system (e.g., the probability of being operational at a future time, or the expected remaining system life) using heterogeneous data from a variety of sources. We discuss component reliability models incorporating physical understanding, condition measurements from sensors, and environmental covariates; system reliability models that allow prediction of system failure time distributions from component failure models; and the use of Bayesian techniques to incorporate expert judgments into component and system models.

  2. An Experimental Metagenome Data Management and AnalysisSystem

    SciTech Connect (OSTI)

    Markowitz, Victor M.; Korzeniewski, Frank; Palaniappan, Krishna; Szeto, Ernest; Ivanova, Natalia N.; Kyrpides, Nikos C.; Hugenholtz, Philip

    2006-03-01

    The application of shotgun sequencing to environmental samples has revealed a new universe of microbial community genomes (metagenomes) involving previously uncultured organisms. Metagenome analysis, which is expected to provide a comprehensive picture of the gene functions and metabolic capacity of microbial community, needs to be conducted in the context of a comprehensive data management and analysis system. We present in this paper IMG/M, an experimental metagenome data management and analysis system that is based on the Integrated Microbial Genomes (IMG) system. IMG/M provides tools and viewers for analyzing both metagenomes and isolate genomes individually or in a comparative context.

  3. Integrated Distribution Management System for Alabama Principal Investigator

    SciTech Connect (OSTI)

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables data access and enterprise application integration.

  4. Software for the occupational health and safety integrated management system

    SciTech Connect (OSTI)

    Vătăsescu, Mihaela

    2015-03-10

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety.

  5. Information security management system planning for CBRN facilities

    SciTech Connect (OSTI)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  6. Drought management and its impact on public water systems

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This volume represents the report on a colloquium sponsored by the National Research Council's Water Science and Technology Board, 5 September 1985. It includes five background papers on drought, drought management, risks for public systems, and legal and institutional aspects, plus appendices on conservation and rationing plans for Los Angeles and Salt Lake County. The conclusions of the volume include: (1) there is substantial need for continued research on drought and its impact on the management of public water systems; (2) sizing of the physical facilities of a system should not be based solely on full-service requirements during the drought of record, nor should such facilities be sized by the arbitrary specification of hydrologic risk; and (3) the key to adequate drought management of public water systems lies in predrought preparation.

  7. Foreign_Travel_Management_System_(FTMS).pdf

    Energy Savers [EERE]

    Energy Follow-up Audit on Stockpile Surveillance Testing, IG-0744 Follow-up Audit on Stockpile Surveillance Testing, IG-0744 Significant backlogs existed in each of the three types of tests Surveillance Testing conducted in the Surveillance Testing Program---laboratory tests, flight tests, and component tests---as of September 30? 2005. Laboratory tests are conducted on weapons' non-nuclear systems to detect defects due to handling, aging, manufacturing, or design. Flight tests involve

  8. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kosteinik, Kevin M.; Sloan, Paul A.

    2004-07-06

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  9. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kostelnik, Kevin M.; Sloan, Paul A.

    2006-10-17

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  10. Vehicle Technologies Office Merit Review 2016: 2016 KIVA-hpFE Development:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Robust and Accurate Engine Modeling Software | Department of Energy 2016 KIVA-hpFE Development: A Robust and Accurate Engine Modeling Software Vehicle Technologies Office Merit Review 2016: 2016 KIVA-hpFE Development: A Robust and Accurate Engine Modeling Software Presentation given by Los Alamos National Laboratory (LANL) at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Combustion Engines

  11. Software Configuration Management Plan (SCMP) version 1.1, Phase 1. Federal Emergency Management Information System (FEMIS): System platform

    SciTech Connect (OSTI)

    Strycker, F.E. Jr.

    1993-07-19

    This document is the Software Configuration Management Plan (SCMP) for the Federal Emergency Management Information System (FEMIS) project. FEMIS is an automated decision support system that integrates the planning and analysis, operations and response, and recovery phases of emergency management. It has broad application across the full range of emergency planning and operations. The SCMP will describe the configuration management system to be used for the control and maintenance of the software and associated documentation during development, test, and production of the FEMIS project. This plan provides information on the requirements and procedures necessary for the configuration management activities of FEMIS. It identifies the software configuration management requirements and establishes the methodology for generating configuration identifiers, controlling engineering changes, maintaining status accounting, and performing audits and reviews during the design and development of software configuration items. This plan defines the Software Configuration Management (SCM) activities necessary for maintaining all support software items and associated documentation being developed, procured, tested, sustained and kept in the production environment for FEMIS. It will apply to all phases of the software development life cycle, up to and including the time of delivery to the customer.

  12. Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure

    Office of Environmental Management (EM)

    Corrective Action Standard Operating Procedure (ECASOP) Issued by Office of Project Management, Oversight, and Assessments (PMOA) PM-1 September 21, 2015 DEPARTMENT OF ENERGY EVMS CORRECTIVE ACTION SOP SEPTEMBER 21, 2015 ii Earned Value Management System (EVMS) Corrective Action (CA) Standard Operating Procedure (ECASOP) OPR: PM-30 Issue Date: September 21, 2015 1. PURPOSE. This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as a primary reference for PMOA PM-1 for

  13. Earned Value Management System Gold Card | Department of Energy

    Energy Savers [EERE]

    Gold Card Earned Value Management System Gold Card Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments on a project or task. It provides both the government and contractors the ability to examine detailed schedule information, critical program and technical milestones, and cost data. Formulas and Terminology "Gold Card" -- September 2011 (92.71 KB) Key Resources PMCDP EVMS PARS IIe FPD

  14. Periodicals collection management using a decision support system

    SciTech Connect (OSTI)

    Compton, M.L.; Moser, E.C.

    1993-12-31

    Sandia National Laboratories is a multiprogram national laboratory established in 1949. The Library currently uses DOBIS for its automated system, including the Periodicals Control function for periodical check-in. DOBIS performs processing and control functions adequately, but could not meet our reporting needs. Therefore the Library`s Periodicals Decision Team decided that they needed another ``system`` for collection management. A Periodicals Decision Support System was created using information downloaded from DOBIS and uploaded into dBASE IV. The Periodical Decision Support System functions as an information-processing system that has aided us in making collection management decisions for periodicals. It certainly allows us to do interactive ad-hoc analysis; although there are no modeling tools currently incorporated in the system. We hope that these modeling tools will come later. We have been gathering information and developing needed reports to achieve this goal.

  15. New system reduces sludge management costs

    SciTech Connect (OSTI)

    Roll, R.R. ); Koser, M.R. )

    1993-06-01

    This article describes a recently completed a $2.7-million project to upgrade the sludge dewatering and stabilizing system at a 48-mgd wastewater treatment facility in Niagara Fall, New York. The work was necessitated by the deteriorated condition of the plant's original vacuum filters and increasing costs to landfill the dewatered sludge. The new equipment has restored sludge production capacity while reducing the final material's moisture content. The Niagara Falls plant is one of the few municipal physical-chemical treatment plants built in this country, and is the largest still functioning. Constructed in the mid-1970s, it was designed to treat a combination of domestic sewage and industrial wastes. One third of the flow and one half of the solids are industrial in nature. The changes made reduced electrical power consumption and sanitary landfill costs.

  16. Patch and Update Management Program for Energy Delivery Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Patch and Update Management Program for Energy Delivery Systems A simplified process of patching and updating energy delivery system devices for end users and equipment vendors Background The energy sector places an emphasis on the availability and reliability of energy delivery operations. While best practice avoids the connection of energy delivery system devices to external networks, their increasing interconnectivity poses greater risk to cyber vulnerabilities. Proper and timely patches and

  17. Integrated dynamic modeling and management system mission analysis

    SciTech Connect (OSTI)

    Lee, A.K.

    1994-12-28

    This document summarizes the mission analysis performed on the Integrated Dynamic Modeling and Management System (IDMMS). The IDMMS will be developed to provide the modeling and analysis capability required to understand the TWRS system behavior in terms of the identified TWRS performance measures. The IDMMS will be used to demonstrate in a verified and validated manner the satisfactory performance of the TWRS system configuration and assurance that the requirements have been satisfied.

  18. A key management concept for the CTBT International Monitoring System

    SciTech Connect (OSTI)

    Herrington, P.; Draelos, T.; Craft, R.; Brickell, E.; Frankel, Y.; Silvestri, M.

    1997-08-01

    Cryptographic authentication (commonly referred to as ``technical authentication`` in Working Group B) is an enabling technology which ensures the integrity of sensor data and security of digital networks under various data security compromise scenarios. The use of cryptographic authentication,however, implies the development of a key management infrastructure for establishing trust in the generation and distribution of cryptographic keys. This paper proposes security and operational requirements for a CTBT (Comprehensive Test Ban Treaty) key management system and, furthermore, presents a public key based solution satisfying the requirements. The key management system is instantiated with trust distribution technologies similar to those currently implemented in industrial public key infrastructures. A complete system solution is developed.

  19. Adding Data Management Services to Parallel File Systems

    SciTech Connect (OSTI)

    Brandt, Scott

    2015-03-04

    The objective of this project, called DAMASC for “Data Management in Scientific Computing”, is to coalesce data management with parallel file system management to present a declarative interface to scientists for managing, querying, and analyzing extremely large data sets efficiently and predictably. Managing extremely large data sets is a key challenge of exascale computing. The overhead, energy, and cost of moving massive volumes of data demand designs where computation is close to storage. In current architectures, compute/analysis clusters access data in a physically separate parallel file system and largely leave it scientist to reduce data movement. Over the past decades the high-end computing community has adopted middleware with multiple layers of abstractions and specialized file formats such as NetCDF-4 and HDF5. These abstractions provide a limited set of high-level data processing functions, but have inherent functionality and performance limitations: middleware that provides access to the highly structured contents of scientific data files stored in the (unstructured) file systems can only optimize to the extent that file system interfaces permit; the highly structured formats of these files often impedes native file system performance optimizations. We are developing Damasc, an enhanced high-performance file system with native rich data management services. Damasc will enable efficient queries and updates over files stored in their native byte-stream format while retaining the inherent performance of file system data storage via declarative queries and updates over views of underlying files. Damasc has four key benefits for the development of data-intensive scientific code: (1) applications can use important data-management services, such as declarative queries, views, and provenance tracking, that are currently available only within database systems; (2) the use of these services becomes easier, as they are provided within a familiar file

  20. Fuzzy-Logic Subsumption Controller for Home Energy Management Systems

    SciTech Connect (OSTI)

    Ainsworth, Nathan; Johnson, Brian; Lundstrom, Blake

    2015-10-06

    Home Energy Management Systems (HEMS) are controllers that manage and coordinate the generation, storage, and loads in a home. These controllers are increasingly necessary to ensure that increasing penetrations of distributed energy resources are used effectively and do not disrupt the operation of the grid. In this paper, we propose a novel approach to HEMS design based on behavioral control methods, which do not require accurate models or predictions and are very responsive to changing conditions. We develop a proof-of-concept behavioral HEMS controller and show by simulation on an example home energy system that it capable of making context-dependent tradeoffs between goals under challenging conditions.

  1. Laboratory information management system at the Hanford Site

    SciTech Connect (OSTI)

    Leggett, W.; Barth, D.; Ibsen, T.; Newman, B.

    1994-03-01

    In January of 1994 an important new technology was brought on line to help in the monumental waste management and environmental restoration work at the Hanford Site. Cleanup at the Hanford Site depends on analytical chemistry information to identify contaminates, design and monitor cleanup processes, assure worker safety, evaluate progress, and prove completion. The new technology, a laboratory information management system (LIMS) called ``LABCORE,`` provides the latest systems to organize and communicate the analytical tasks: track work and samples; collect and process data, prepare reports, and store data in readily accessible electronic form.

  2. Alarm Management System for the D/3 Distributed Control System

    Energy Science and Technology Software Center (OSTI)

    1997-03-19

    As industrial processes continue to grow in size and complexity, the Distrubuted Control Systems that automate and monitor these processes expand in a like manner. This increase in control system complexity has resulted in ever increasing numbers of alarms presented to the operator. The challenge for today's control system designer is to find innovative ways to present alarm information to the operator such that despite the large number of alarms, the operator is able tomore » quickly assess the status of the plant and immediately respond to the most critical alarms in a timely manner. This software package, designed and developed for the Savannah River Site Replacement High Level Waste Evaporator/Waste Removal Distributed Control System installed on the H-Area Tank Farm, provides an alarm system which utilizes the annunciator (SKID) panel as a means of statusing the plant and providing single keystroke access to the display on which an alarm resides.« less

  3. Energy management system turns data into market info

    SciTech Connect (OSTI)

    Traynor, P.J.; Ackerman, W.J.

    1996-09-01

    The designers claim that Wisconsin Power & Light Co`s new energy management system is the first system of its type in the world in terms of the comprehensiveness and scope of its stored and retrievable data. Furthermore, the system`s link to the utility`s generating assets enables powerplant management to dispatch generation resources based on up-to-date unit characteristics. That means that the new system gives WP&L a competitive tool to optimize operations as well as fine-tune its EMS based on timely load and unit response information. Additionally, the EMS gives WP&L insight into the complex issues related to the unbundling of generation resources.

  4. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    SciTech Connect (OSTI)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  5. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    SciTech Connect (OSTI)

    Burford, M.J.; Burnett, R.A.; Downing, T.R.

    1996-12-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.

  6. Using an automated code management system to improve configuration control practices

    SciTech Connect (OSTI)

    Meyer, S.

    1997-11-01

    This report contains viewgraphs on using an automated code management system to improve configuration control practice.

  7. Computerized management report system for monitoring manpower and cost

    SciTech Connect (OSTI)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  8. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  9. Product Lifecycle Management Architecture: A Model Based Systems Engineering Analysis.

    SciTech Connect (OSTI)

    Noonan, Nicholas James

    2015-07-01

    This report is an analysis of the Product Lifecycle Management (PLM) program. The analysis is centered on a need statement generated by a Nuclear Weapons (NW) customer. The need statement captured in this report creates an opportunity for the PLM to provide a robust service as a solution. Lifecycles for both the NW and PLM are analyzed using Model Based System Engineering (MBSE).

  10. Nuclear Materials Management and Safeguards System Reporting and Data Submission

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-02-10

    The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

  11. Energy.gov Content Management System Page Types

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, learn about the standard page types available in the Energy.gov Drupal content management system (CMS). For information about other available page types, or to request a new kind of page type, contact the Site Coordinators.

  12. Energy storage management system with distributed wireless sensors

    SciTech Connect (OSTI)

    Farmer, Joseph C.; Bandhauer, Todd M.

    2015-12-08

    An energy storage system having a multiple different types of energy storage and conversion devices. Each device is equipped with one or more sensors and RFID tags to communicate sensor information wirelessly to a central electronic management system, which is used to control the operation of each device. Each device can have multiple RFID tags and sensor types. Several energy storage and conversion devices can be combined.

  13. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  14. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  15. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  16. Freescale Semiconductor Successfully Implements an Energy Management System

    SciTech Connect (OSTI)

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  17. Systems approaches to integrated solid waste management in developing countries

    SciTech Connect (OSTI)

    Marshall, Rachael E.; Farahbakhsh, Khosrow

    2013-04-15

    Highlights: ? Five drivers led developed countries to current solid waste management paradigm. ? Many unique factors challenge developing country solid waste management. ? Limited transferability of developed country approaches to developing countries. ? High uncertainties and decision stakes call for post-normal approaches. ? Systems thinking needed for multi-scale, self-organizing eco-social waste systems. - Abstract: Solid waste management (SWM) has become an issue of increasing global concern as urban populations continue to rise and consumption patterns change. The health and environmental implications associated with SWM are mounting in urgency, particularly in the context of developing countries. While systems analyses largely targeting well-defined, engineered systems have been used to help SWM agencies in industrialized countries since the 1960s, collection and removal dominate the SWM sector in developing countries. This review contrasts the history and current paradigms of SWM practices and policies in industrialized countries with the current challenges and complexities faced in developing country SWM. In industrialized countries, public health, environment, resource scarcity, climate change, and public awareness and participation have acted as SWM drivers towards the current paradigm of integrated SWM. However, urbanization, inequality, and economic growth; cultural and socio-economic aspects; policy, governance, and institutional issues; and international influences have complicated SWM in developing countries. This has limited the applicability of approaches that were successful along the SWM development trajectories of industrialized countries. This review demonstrates the importance of founding new SWM approaches for developing country contexts in post-normal science and complex, adaptive systems thinking.

  18. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  19. DOE-RL Integrated Safety Management System Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-09-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  20. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization

    SciTech Connect (OSTI)

    Wang, Jianhui

    2015-09-01

    This report describes the application functions for distribution management systems (DMS). The application functions are those surveyed by the IEEE Power and Energy Society’s Task Force on Distribution Management Systems. The description of each DMS application includes functional requirements and the key features and characteristics in current and future deployments, as well as a summary of the major benefits provided by each function to stakeholders — from customers to shareholders. Due consideration is paid to the fact that the realizable benefits of each function may differ by type of utility, whether investor-owned, cooperative, or municipal. This report is sufficient to define the functional requirements of each application for system procurement (request-for-proposal [RFP]) purposes and for developing preliminary high-level use cases for those functions. However, it should not be considered a design document that will enable a vendor or software developer to design and build actual DMS applications.

  1. Tank monitor and control system (TMACS) software configuration management plan

    SciTech Connect (OSTI)

    GLASSCOCK, J.A.

    1999-05-13

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  2. Concept of Operations for Real-time Airborne Management System

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  3. Nexus: a modular workflow management system for quantum simulation codes

    SciTech Connect (OSTI)

    Krogel, Jaron T.

    2015-08-24

    The management of simulation workflows is a significant task for the individual computational researcher. Automation of the required tasks involved in simulation work can decrease the overall time to solution and reduce sources of human error. A new simulation workflow management system, Nexus, is presented to address these issues. Nexus is capable of automated job management on workstations and resources at several major supercomputing centers. Its modular design allows many quantum simulation codes to be supported within the same framework. Current support includes quantum Monte Carlo calculations with QMCPACK, density functional theory calculations with Quantum Espresso or VASP, and quantum chemical calculations with GAMESS. Users can compose workflows through a transparent, text-based interface, resembling the input file of a typical simulation code. A usage example is provided to illustrate the process.

  4. Nexus: a modular workflow management system for quantum simulation codes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Krogel, Jaron T.

    2015-08-24

    The management of simulation workflows is a significant task for the individual computational researcher. Automation of the required tasks involved in simulation work can decrease the overall time to solution and reduce sources of human error. A new simulation workflow management system, Nexus, is presented to address these issues. Nexus is capable of automated job management on workstations and resources at several major supercomputing centers. Its modular design allows many quantum simulation codes to be supported within the same framework. Current support includes quantum Monte Carlo calculations with QMCPACK, density functional theory calculations with Quantum Espresso or VASP, and quantummore » chemical calculations with GAMESS. Users can compose workflows through a transparent, text-based interface, resembling the input file of a typical simulation code. A usage example is provided to illustrate the process.« less

  5. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2

    SciTech Connect (OSTI)

    SETH, S.S.

    2000-01-10

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

  6. Energy management system helps container manufacturer contain costs

    SciTech Connect (OSTI)

    Not Available

    1986-04-10

    In the highly competitive cardboard box business, where a penny apiece can mean the difference between getting and losing an order, St. Hart Container Corp., Placentia, CA, has gained a competitive edge by reducing its overhead with an energy management system (EMS). The Orange County firm, a division of Sunclipse, Inc., fabricates boxes to customer specifications from cardboard stock. The company is saving $2000 a month in electricity since it installed a Gereral Electric ECON-S programmable energy management system with telephone override capability late in 1984 to control lighting, air conditioning, and nine large blower and compressor motors. Installed by Hughes Electrical Management Systems (HEMS), City of Industry, CA, the $18,000 system paid for itself in only 9 mo. It initially controlled just 32 points and will be expanded to control the conveyors in the 60,000 sq ft plant. The primary savings, HEMS president Bob Hughes noted, accrue not from controlling lighting, but from automatically limiting the operating time of large blower motors that draw cardboard scrap from six fabrication areas on the shop floor up 2 ft dia funnels into a roof-mounted silo. The scrap is later compacted, baled, and sold for recycling.

  7. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  8. DOE-RL Integrated Safety Management System Program Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-06-29

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight.

  9. NNSA's G2 Management Information System Wins Association for Enterprise

    National Nuclear Security Administration (NNSA)

    Information's (AFEI) "Excellence in Enterprise Information Award" | National Nuclear Security Administration | (NNSA) NNSA's G2 Management Information System Wins Association for Enterprise Information's (AFEI) "Excellence in Enterprise Information Award" February 17, 2016 The G2 team and the 2015 Association for Enterprise Information's (AFEI) Excellence in Enterprise Information Award. (WASHINGTON, D.C) - The National Nuclear Security Administration (NNSA) has received

  10. Energy implications of integrated solid waste management systems. Final report

    SciTech Connect (OSTI)

    Little, R.E.; McClain, G.; Becker, M.; Ligon, P.; Shapiro, K.

    1994-07-01

    This study develops estimates of energy use and recovery from managing municipal solid waste (MSW) under various collection, processing, and disposal scenarios. We estimate use and recovery -- or energy balance -- resulting from MSW management activities such as waste collection, transport, processing, and disposal, as well as indirect use and recovery linked to secondary materials manufacturing using recycled materials. In our analysis, secondary materials manufacturing displaces virgin materials manufacturing for 13 representative products. Energy implications are expressed as coefficients that measure the net energy saving (or use) of displacing products made from virgin versus recycled materials. Using data developed for the 1992 New York City Master Plan as a starting point, we apply our method to an analysis of various collection systems and 30 types of facilities to illustrate bow energy balances shift as management systems are modified. In sum, all four scenarios show a positive energy balance indicating the energy and advantage of integrated systems versus reliance on one or few technology options. That is, energy produced or saved exceeds the energy used to operate the solid waste system. The largest energy use impacts are attributable to processing, including materials separation and composting. Collection and transportation energy are relatively minor contributors. The largest two contributors to net energy savings are waste combustion and energy saved by processing recycled versus virgin materials. An accompanying spatial analysis methodology allocates energy use and recovery to New York City, New York State outside the city, the U.S., and outside the U.S. Our analytical approach is embodied in a spreadsheet model that can be used by energy and solid waste analysts to estimate impacts of management scenarios at the state and substate level.

  11. International Border Management Systems (IBMS) Program : visions and strategies.

    SciTech Connect (OSTI)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  12. Tank waste remediation system nuclear criticality safety program management review

    SciTech Connect (OSTI)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  13. Development of the RFID System for nuclear materials management.

    SciTech Connect (OSTI)

    Chen, K.; Tsai, H.; Liu, Y. Y.

    2008-01-01

    Radio frequency identification (RFID) is one of today's most rapidly growing technologies in the automatic data collection industry. Although commercial applications are already widespread, the use of this technology for managing nuclear materials is only in its infancy. Employing an RFID system has the potential to offer an immense payback: enhanced safety and security, reduced need for manned surveillance, real-time access to status and event history data, and overall cost-effectiveness. The Packaging Certification Program (PCP) in the U.S. Department of Energy's (DOE's) Office of Environmental Management (EM), Office of Packaging and Transportation (EM-63), is developing an RFID system for nuclear materials management. The system consists of battery-powered RFID tags with onboard sensors and memories, a reader network, application software, a database server and web pages. The tags monitor and record critical parameters, including the status of seals, movement of objects, and environmental conditions of the nuclear material packages in real time. They also provide instant warnings or alarms when preset thresholds for the sensors are exceeded. The information collected by the readers is transmitted to a dedicated central database server that can be accessed by authorized users across the DOE complex via a secured network. The onboard memory of the tags allows the materials manifest and event history data to reside with the packages throughout their life cycles in storage, transportation, and disposal. Data security is currently based on Advanced Encryption Standard-256. The software provides easy-to-use graphical interfaces that allow access to all vital information once the security and privilege requirements are met. An innovative scheme has been developed for managing batteries in service for more than 10 years without needing to be changed. A miniature onboard dosimeter is being developed for applications that require radiation surveillance. A field

  14. UNCLASSIFIED UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    UNCLASSIFIED Nuclear Materials Management & Safeguards System CONTACT INFORMATION UPDATE REPORTING IDENTIFICATION SYMBOL (RIS) RIS: Address: Facility Name: CONTACTS Name Email: Phone/Fax Name Email: Phone/Fax Name Email: Phone/Fax Name Email: Phone/Fax Return Via Mail To: U.S Department Of Energy ATTN: NMMSS Staff NA-73, GTN 1000 Independence Avenue, SW Washington, DC 20585-1290 Return Via Fax To: 301-903-1998 Return Via E-Mail To: NMMSS@nnsa.doe.gov

  15. Substation based data interpretation techniques for improved power system management

    SciTech Connect (OSTI)

    Booth, C.; McDonald, J.R.; Laycock, W.J.

    1997-04-01

    There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

  16. Local rules for protein folding on a triangular lattice and generalized hydrophobicity in the HP model

    SciTech Connect (OSTI)

    Agarwala, R. [National Institutes of Health, Bethesda, MD (United States); Batzoglou, S. [MIT, Cambridge, MA (United States); Dancik, V. [Univ. of Southern California, Los Angeles, CA (United States)] [and others

    1997-06-01

    We consider the problem of determining the three-dimensional folding of a protein given its one-dimensional amino acid sequence. We use the HP model for protein folding proposed by Dill, which models protein as a chain of amino acid residues that are either hydrophobic or polar, and hydrophobic interactions are the dominant initial driving force for the protein folding. Hart and Istrail gave approximation algorithms for folding proteins on the cubic lattice under HP model. In this paper, we examine the choice of a lattice by considering its algorithmic and geometric implications and argue that triangular lattice is a more reasonable choice. We present a set of folding rules for a triangular lattice and analyze the approximation ratio which they achieve. In addition, we introduce a generalization of the HP model to account for residues having different levels of hydrophobicity. After describing the biological foundation for this generalization, we show that in the new model we are able to achieve similar constant factor approximation guarantees on the triangular lattice as were achieved in the standard HP model. While the structures derived from our folding rules are probably still far from biological reality, we hope that having a set of folding rules with different properties will yield more interesting folds when combined.

  17. Tank Waste Remediation Systems (TWRS) Configuration Management Implementation Plan

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-12-18

    The Tank Waste Configuration Management (TWRS) Configuration Management Implementation Plan descibes the execution of the configuration management (CM) that the contractor uses to manage and integrate its programmatic and functional operations to perform work.

  18. Biology and management of insect pests in North American intensively managed hardwood forest systems.

    SciTech Connect (OSTI)

    Coyle, David R.; Nebeker, T., E.; Hart, E., R.; Mattson, W., J.

    2005-01-01

    Annu. Rev. Entomol. 50:1-29. Abstract Increasing demand for wood and wood products is putting stress on traditional forest production areas, leading to long-term economic and environmental concerns. Intensively managed hardwood forest systems (IMHFS), grown using conventional agricultural as well as forestry methods, can help alleviate potential problems in natural forest production areas. Although IMHFS can produce more biomass per hectare per year than natural forests, the ecologically simplified, monocultural systems may greatly increase the crops susceptibility to pests. Species in the genera Populus and Salix comprise the greatest acreage in IMHFS in North America, but other species, including Liquidambar styracifua and Platanus occidentalis, are also important. We discuss life histories, realized and potential damage, and management options for the most economically infuential pests that affect these hardwood species. The substantial inherent challenges associated with pest management in the monocultural environments created by IMHFS are reviewed. Finally, we discuss ways to design IMHFS that may reduce their susceptibility to pests, increase their growth and productivity potential, and create a more sustainable environment.

  19. Method and system for managing power grid data (Patent) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Method and system for managing power grid data A system and method of managing time-series data for smart grids is disclosed. Data is ...

  20. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt

    2007-01-23

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  1. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt

    2005-12-13

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  2. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Downing, T.R.

    1997-11-21

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.

  3. Trends in Energy Management Technology - Part 4: Review ofAdvanced Applications in Energy Management, Control, and InformationSystems

    SciTech Connect (OSTI)

    Yee, Gaymond; Webster, Tom

    2003-08-01

    In this article, the fourth in a series, we provide a review of advanced applications in Energy Management, Control, and Information Systems (EMCIS). The available features for these products are summarized and analyzed with regard to emerging trends in EMCIS and potential benefits to the Federal sector. The first article [1] covered enabling technologies for emerging energy management systems. The second article [2] serves as a basic reference for building control system (BCS) networking fundamentals and includes an assessment of current approaches to open communications. The third article [3] evaluated several products that exemplify the current state of practice in EMCIS. It is important for energy managers in the Federal sector to have a high level of knowledge and understanding of these complex energy management systems. This series of articles provides energy practitioners with some basic informational and educational tools to help make decisions relative to energy management systems design, specification, procurement, and energy savings potential.

  4. U-205: RSA Access Manager Session Replay Flaw Lets Remote Users Access the System

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in RSA Access Manager. A remote user can gain access to the target system.

  5. Office of Personnel Management (OPM) Billing System PIA, Office of Health,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Security | Department of Energy Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security (210.01 KB) More Documents & Publications PIA - Security Clearance Work

  6. Method and system for managing power grid data

    SciTech Connect (OSTI)

    Yin, Jian; Akyol, Bora A.; Gorton, Ian

    2015-11-10

    A system and method of managing time-series data for smart grids is disclosed. Data is collected from a plurality of sensors. An index is modified for a newly created block. A one disk operation per read or write is performed. The one disk operation per read includes accessing and looking up the index to locate the data without movement of an arm of the disk, and obtaining the data. The one disk operation per write includes searching the disk for free space, calculating an offset, modifying the index, and writing the data contiguously into a block of the disk the index points to.

  7. Energy Management System Implementation … Do and Check

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    W3-3 Advanced Manufacturing Office eere.energy.gov ADVANCED MANUFACTURING OFFICE Energy Management System Implementation - Do and Check Ed Hardison Dorothy Atwood Deann Desai WC 4-26-12 W3-4 Advanced Manufacturing Office eere.energy.gov Hide and Show the GoToWebinar Panel Hide Show WC 4-26-12 W3-5 Advanced Manufacturing Office eere.energy.gov Type Questions WC 4-26-12 W3-6 Advanced Manufacturing Office eere.energy.gov Audio Selection WC 4-26-12 W3-7 Advanced Manufacturing Office eere.energy.gov

  8. Energy Management System Implementation … First Webinar- Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    W1-1 | Advanced Manufacturing Office eere.energy.gov ADVANCED MANUFACTURING OFFICE Energy Management System Implementation - First Webinar- Overview Deann Desai and Ed Hardison 4/19/2012 WC 4-18-12 W1-2 | Advanced Manufacturing Office eere.energy.gov Hide and Show the GoToWebinar Panel Hide Show WC 4-18-12 W1-3 | Advanced Manufacturing Office eere.energy.gov Type Questions WC 4-18-12 W1-4 | Advanced Manufacturing Office eere.energy.gov Audio Selection WC 4-18-12 W1-5 | Advanced Manufacturing

  9. Waste Heat Management Options: Industrial Process Heating Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat Management Options Industrial Process Heating Systems By Dr. Arvind C. Thekdi E-mail: athekdi@e3minc.com E3M, Inc. August 20, 2009 2 Source of Waste Heat in Industries * Steam Generation * Fluid Heating * Calcining * Drying * Heat Treating * Metal Heating * Metal and Non-metal Melting * Smelting, agglomeration etc. * Curing and Forming * Other Heating Waste heat is everywhere! Arvind Thekdi, E3M Inc Arvind Thekdi, E3M Inc 3 Waste Heat Sources from Process Heating Equipment * Hot gases -

  10. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  11. Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Carter, R.J.

    1998-06-26

    The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS

  12. U-214: HP Network Node Manager Java JDK / JRE Multiple Vulnerabilities

    Broader source: Energy.gov [DOE]

    Vulnerabilities could be remotely exploited resulting in unauthorized information disclosure, modification, Denial of Service (DoS).

  13. Transportation functions of the Civilian Radioactive Waste Management System

    SciTech Connect (OSTI)

    Shappert, L.B.; Attaway, C.R.; Pope, R.B. ); Best, R.E.; Danese, F.L. ); Dixon, L.D. , Martinez, GA ); Jones, R.H. , Los Gatos, CA ); Klimas, M.J. ); Peterson, R.W

    1992-03-01

    Within the framework of Public Law 97.425 and provisions specified in the Code of Federal Regulations, Title 10 Part 961, the US Department of Energy has the responsibility to accept and transport spent fuel and high-level waste from various organizations which have entered into a contract with the federal government in a manner that protects the health and safety of the public and workers. In implementing these requirements, the Office of Civilian Radioactive Waste Management (OCRWM) has, among other things, supported the identification of functions that must be performed by a transportation system (TS) that will accept the waste for transport to a federal facility for storage and/or disposal. This document, through the application of system engineering principles, identifies the functions that must be performed to transport waste under this law.

  14. DOE technology information management system database study report

    SciTech Connect (OSTI)

    Widing, M.A.; Blodgett, D.W.; Braun, M.D.; Jusko, M.J.; Keisler, J.M.; Love, R.J.; Robinson, G.L.

    1994-11-01

    To support the missions of the US Department of Energy (DOE) Special Technologies Program, Argonne National Laboratory is defining the requirements for an automated software system that will search electronic databases on technology. This report examines the work done and results to date. Argonne studied existing commercial and government sources of technology databases in five general areas: on-line services, patent database sources, government sources, aerospace technology sources, and general technology sources. First, it conducted a preliminary investigation of these sources to obtain information on the content, cost, frequency of updates, and other aspects of their databases. The Laboratory then performed detailed examinations of at least one source in each area. On this basis, Argonne recommended which databases should be incorporated in DOE`s Technology Information Management System.

  15. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R.; Bailey, S.; Bower, J.C.

    1993-01-01

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  16. Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01

    To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

  17. DOEIEV.0005/35 ANL-OHS/HP-83403 FORMERLY UTILIZED MEDIAEC SITES

    Office of Legacy Management (LM)

    p, .' jl&Lj p ' -7 c. .3- 4; .z 1. . . ' 1 DOEIEV.0005/35 ANL-OHS/HP-83403 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY OF CHEMICALS GROUP, OLIN CORPORATION (Formerly Blockson Chemical Company) JOLIET, ILLINOIS March 27,November 28, 1978 OCCUPATIONAL HEALTH AND SAFETY DIVISION Health Physics Section ARGONNE NATIONAL LABORATORY, ARGONNE, ILLINOIS Operated by THE UNIVERSITY OF CHICAGO for the U. S. DEPARTMENT OF ENERGY under Contract W-31-10%Eng-38 ..__^ --

  18. I stlbjcot; REQUEST H(P1 SPEWAL~GQPA - BIPUCHED WVg.

    Office of Legacy Management (LM)

    JI& 1, 1952 ..: .i I stlbjcot; REQUEST H(P1 SPEWAL~GQPA - BIPUCHED WVg. In-TIlg~FCRU (H' (9) &liRADIATED 'F SLUGS i _ BvergiKortsbotiUbeuadetouo@otatbera~h~kati tbeearliestposalb~dato 60 tbattba.P235ccmberpturnd/ PFW:bjr Distribution: 1.. " ,- 7 !. i Q-s. 1-3 - .4dd.ressw : .I - J. If. kmen, G.E. L .5 - kil &Files/ :

  19. Microstructural characterization of dissimilar welds between alloy 800 and HP heat-resistant steel

    SciTech Connect (OSTI)

    Dehmolaei, R.; Shamanian, M. Kermanpur, A.

    2008-10-15

    In this study, dissimilar welds between HP heat-resistant steel and Incoloy 800 were made with four different filler materials including: 309 stainless steel and nickel-based Inconel 82, 182 and 617. The microstructure of the base metals, weld metals and their interfaces were characterized by utilizing optical and scanning electron microscopy. Grain boundaries migration in the weld metals was studied. It was found that the migration of grain boundaries in the Inconel 82 weld metal was very extensive. Precipitates of TiC and M{sub 23}C{sub 6} (M = Cr and Mo) in the Inconel 617 weld metal are identified. The necessary conditions for the formation of cracks close to the fusion line of the 309-HP joints are described. Furthermore unmixed zone near the fusion line between HP steel base metal and Inconel 82 weld metal is discussed. An epitaxial growth is characterized at the fusion line of the 309-Alloy 800 and Inconel 617-Alloy 800 joints.

  20. Wang-Landau sampling of the interplay between surface adsorption and folding of HP lattice proteins

    SciTech Connect (OSTI)

    Li, Ying Wai [ORNL] [ORNL; Wuest, Thomas [Swiss Federal Research Institute, Switzerland] [Swiss Federal Research Institute, Switzerland; Landau, David P [University of Georgia, Athens, GA] [University of Georgia, Athens, GA

    2014-01-01

    Generic features associated with the adsorption of proteins on solid surfaces are reviewed within the framework of the hydrophobic-polar (HP) lattice protein model. The thermodynamic behavior and structural properties of various HP protein sequences interacting with attractive surfaces have been studied using extensive Wang-Landau sampling with different types of surfaces, each of which attracts either: all monomers, only hydrophobic (H) monomers, or only polar (P) monomers, respectively. Consequently, different types of folding behavior occur for varied surface strengths. Analysis of the combined patterns of various structural observables, e.g., the derivatives of the numbers of interaction contacts, together with the specific heat, leads to the identification of fundamental categories of folding and transition hierarchies. We also inferred a connection between the transition categories and the relative surface strengths, i.e., the ratios of the surface attractive strengths to the intra-chain attraction among H monomers. We thus believe that the folding hierarchies and identification scheme are generic for different HP sequences interacting with attractive surfaces, regardless of the chain length, sequence, or surface attraction.

  1. Solid waste information and tracking system server conversion project management plan

    SciTech Connect (OSTI)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  2. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314

    SciTech Connect (OSTI)

    MCGREW, D.L.

    2000-04-19

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

  3. NGNP Data Management and Analysis System Modeling Capabilities

    SciTech Connect (OSTI)

    Cynthia D. Gentillon

    2009-09-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. In addition, thermal-hydraulic experiments are conducted to validate codes used to assess reactor safety. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the third NDMAS objective. It describes capabilities for displaying the data in meaningful ways and identifying relationships among the measured quantities that contribute to their understanding.

  4. INTEGRATED SAFETY MANAGEMENT SYSTEM SAFETY CULTURE IMPROVEMENT INITIATIVE

    SciTech Connect (OSTI)

    MCDONALD JA JR

    2009-01-16

    In 2007, the Department of Energy (DOE) identified safety culture as one of their top Integrated Safety Management System (ISMS) related priorities. A team was formed to address this issue. The team identified a consensus set of safety culture principles, along with implementation practices that could be used by DOE, NNSA, and their contractors. Documented improvement tools were identified and communicated to contractors participating in a year long pilot project. After a year, lessons learned will be collected and a path forward determined. The goal of this effort was to achieve improved safety and mission performance through ISMS continuous improvement. The focus of ISMS improvement was safety culture improvement building on operating experience from similar industries such as the domestic and international commercial nuclear and chemical industry.

  5. Thermal management of long-length HTS cable systems

    SciTech Connect (OSTI)

    Demko, Jonathan A; Hassenzahl, William V

    2011-01-01

    Projections of electric power production suggest a major shift to renewables, such as wind and solar, which will be in remote locations where massive quantities of power are available. One solution for transmitting this power over long distances to load centers is direct current (dc), high temperature superconducting (HTS) cables. Electric transmission via dc cables promises to be effective because of the low-loss, highcurrent- carrying capability of HTS wire at cryogenic temperatures. However, the thermal management system for the cable must be carefully designed to achieve reliable and energyefficient operation. Here we extend the analysis of a superconducting dc cable concept proposed by the Electric Power Research Institute (EPRI), which has one stream of liquid nitrogen flowing in a cryogenic enclosure that includes the power cable, and a separate return tube for the nitrogen. Refrigeration stations positioned every 10 to 20 km cool both nitrogen streams. Both go and return lines are contained in a single vacuum/cryogenic envelope. Other coolants, including gaseous helium and gaseous hydrogen, could provide potential advantages, though they bring some technical challenges to the operation of long-length HTS dc cable systems. A discussion of the heat produced in superconducting cables and a system to remove the heat are discussed. Also, an analysis of the use of various cryogenic fluids in long-distance HTS power cables is presented.

  6. Disaster recovery plan for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Adams, D.E.

    1998-09-29

    The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support for the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.

  7. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6

    SciTech Connect (OSTI)

    Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

    1999-06-29

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  8. SRC burn test in 700-hp oil-designed boiler. Volume 1. Integrated report. Final technical report

    SciTech Connect (OSTI)

    Not Available

    1983-09-01

    This burn test program was conducted during the period of August 1982 to February 1983 to demonstrate that Solvent Refined Coal (SRC) products can displace petroleum as a boiler fuel in oil- and gas-designed boilers. The test program was performed at the U.S. Department of Energy's Pittsburgh Energy Technology Center (PETC). Three forms of SRC (pulverized SRC, a solution of SRC dissolved in process-derived distillates, and a slurry of SRC and water) and No. 6 Fuel Oil were evaluated in the 700-hp (30 x 10/sup 6/ Btu/hour) watertube, oil-designed boiler facility at PETC. The test program was managed by the International Coal Refining Company (ICRC) and sponsored by the Department of Energy. Other organizations were involved as necessary to provide the expertise required to execute the test program. This final report represents an integrated overview of the test program conducted at PETC. More detailed information with preliminary data can be obtained from separate reports prepared by PETC, Southern Research Institute, Wheelabrator-Frye, Babcock and Wilcox, and Combustion Engineering. These are presented as Annex Volumes A-F. 25 references, 41 figures, 15 tables.

  9. PIA - EMRC Livelink Records Management System | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National ...

  10. Tank waste remediation system tank waste retrieval risk management plan

    SciTech Connect (OSTI)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  11. Functional requirements for the Automated Transportation Management System: TTP number: RL 439002

    SciTech Connect (OSTI)

    Portsmouth, J.H.

    1992-12-31

    This requirements analysis, documents Department of Energy (DOE) transportation management procedures for the purpose of providing a clear and mutual understanding between users and designers of the proposed Automated Transportation Management System (ATMS). It is imperative that one understand precisely how DOE currently performs traffic management tasks; only then can an integrated system be proposed that successfully satisfies the major requirements of transportation managers and other system users. Accordingly, this report describes the current workings of DOE transportation organizations and then proposes a new system which represents a synthesis of procedures (both current and desired) which forms the basis for further systems development activities.

  12. DOE Order Self Study Modules - DOE O 151.1C Comprehensive Emergency Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 3 DOE O 151.1C Level: Familiar Date: 12/1/08 1 DOE O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. List the objectives of DOE O 151.1C, Comprehensive Emergency Management System

  13. Adding Links in Energy.gov Content Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy.gov Content Management System » Adding Links in Energy.gov Content Management System Adding Links in Energy.gov Content Management System For Office of Energy Efficiency and Renewable Energy (EERE) websites, to add a link in the Energy.gov Drupal content management system (CMS), follow these steps: Edit the page (also called a node) that you want to add a link to. Select the text you want to link. Click the "Link" button. Then: If you are linking to a page on Energy.gov, select

  14. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste plan

    SciTech Connect (OSTI)

    Latray, D.A.

    1998-05-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  15. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect (OSTI)

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  16. DOEIEV-0005/37 ANL=OHS/HP-83406 FORMERLY UTILIZED MEDIAEC SITES

    Office of Legacy Management (LM)

    //, .<.' I ' 1 TL\ t+, -- DOEIEV-0005/37 ANL=OHS/HP-83406 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY OF THE FORMER WATERTOWN ARSENAL PROPERTY SITE 34 AND SITE 41 WATERTOWN, MASSACHUSETTS o\o\-0 G /Q e-+ a+ -? q+ mii ' ( . % QL G+ OCCUPATIONAL HEALTH AND SAFETY INViSiON Health Physics Section ARGONNE NATIONAL LABORATORY, ARGONNE, ILLINOIS Operated by THE UNIVERSITY O F CHICAGO for the U. S. DEPARTMENT O F ENERGY under Contract W=314 09.Eng-38 Argonne National

  17. Selenium Speciation and Management in Wet FGD Systems

    SciTech Connect (OSTI)

    Searcy, K; Richardson, M; Blythe, G; Wallschlaeger, D; Chu, P; Dene, C

    2012-02-29

    , a cursory comparison of capital costs and turndown capabilities for multi-stage and single-stage centrifugal blowers and several flow control methods was completed. For greenfield systems, changing the selection of blower type and flow control method may have payback periods of 4 to 5 years or more if based on energy savings alone. However, the benefits to managing redox chemistry in the scrubber could far outweigh the savings in electricity costs under some circumstances.

  18. DOE ZERH Webinar: Quality Management Systems for Zero Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a quality management program in their business. The focus will be on facilitating builder transition to high-performance homes, minimizing builder risk during that ...

  19. Enterprise Assessments Targeted Review of the Safety System Management...

    Energy Savers [EERE]

    Complex (Y-12) Highly Enriched Uranium Materials Facility (HEUMF). Consolidated Nuclear Security, LLC (CNS) is the management and operating contractor for Y-12. This ...

  20. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  1. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    SciTech Connect (OSTI)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  2. System configuration management plan for the TWRS controlled baseline database system [TCBD

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project`s requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user`s requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  3. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-08-18

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  4. Battery Energy Storage System (BESS) and Battery Management System (BMS) for Grid-Scale Applications

    SciTech Connect (OSTI)

    Lawder, M. T.; Suthar, B.; Northrop, P. W. C.; De, S.; Hoff, C. M.; Leitermann, O.; Crow, M. L.; Santhanagopalan, S.; Subramanian, V. R.

    2014-05-07

    The current electric grid is an inefficient system that wastes significant amounts of the electricity it produces because there is a disconnect between the amount of energy consumers require and the amount of energy produced from generation sources. Power plants typically produce more power than necessary to ensure adequate power quality. By taking advantage of energy storage within the grid, many of these inefficiencies can be removed. Advanced modeling is required when using battery energy storage systems (BESS) for grid storage in order to accurately monitor and control the storage system. Battery management systems (BMS) control how the storage system will be used and a BMS that utilizes advanced physics-based models will offer for much more robust operation of the storage system. The paper outlines the current state of the art for modeling in BMS and the advanced models required to fully utilize BMS for both lithium-ion batteries and vanadium redox-flow batteries. In addition, system architecture and how it can be useful in monitoring and control is discussed. A pathway for advancing BMS to better utilize BESS for grid-scale applications is outlined.

  5. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    SciTech Connect (OSTI)

    Burgard, K.G.

    1998-09-24

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

  6. Distributed Resource Energy Analysis and Management System (DREAMS) Development for Real-time Grid Operations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hawaii has two different Energy Management Systems (EMS) on the islands of Oahu and Maui, and already has very high solar penetration. This project will design new capabilities for these systems to...

  7. Memorandum, Implementation of Department of Energy Manual 450.4-1, Integrated Safety Management System Manual

    Broader source: Energy.gov [DOE]

    Memorandum, Implementation of Department of Energy Manual 450.401, "Integrated Safety Management System Manual". January 4, 2007. Identifies and institutionalizes requirements and responsibilities for the development and implementation of ISM systems throughout DOE.

  8. DOE ZERH Webinar: Quality Management Systems for Zero Energy Ready Home |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Management Systems for Zero Energy Ready Home DOE ZERH Webinar: Quality Management Systems for Zero Energy Ready Home The session will provide background and guidance for how Zero Energy Ready Home builders can integrate a quality management program in their business. The focus will be on facilitating builder transition to high-performance homes, minimizing builder risk during that transition, and ensuring consistent delivery on the HPH value proposition. The

  9. Register today! Professional Training for Certified Practitioners in Energy Management Systems

    Broader source: Energy.gov [DOE]

    Energy professionals are invited to the Certified Practitioner in Energy Management Systems training on February 24–27, 2015 in Chicago, IL. The training provides energy professionals with the ability to lead an industrial organization through the development and maintenance of an energy management system, helping to implement ISO 50001 requirements and prepare for Superior Energy Performance (SEP) certification.

  10. Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB September 2006 LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS Raymond K. Fink David F. Spencer Rita A. Wells NSTB INL/CON-06-11665 iii ABSTRACT Results from ten cyber security vulnerability assessments of process control, SCADA, and energy management systems, or components of those systems, were reviewed to identify

  11. A Distributed Intelligent Automated Demand Response Building Management System

    SciTech Connect (OSTI)

    Auslander, David; Culler, David; Wright, Paul; Lu, Yan; Piette, Mary

    2013-12-30

    The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load

  12. Waste Information Management System: One Year After Web Deployment

    SciTech Connect (OSTI)

    Shoffner, P.A.; Geisler, T.J.; Upadhyay, H.; Quintero, W.

    2008-07-01

    The implementation of the Department of Energy (DOE) mandated accelerated cleanup program created significant potential technical impediments. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to site waste treatment and disposal were potential critical path issues under the accelerated schedules. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast information regarding the volumes and types of waste that would be generated by DOE sites over the next 30 years. Each local DOE site has historically collected, organized, and displayed site waste forecast information in separate and unique systems. However, waste information from all sites needed a common application to allow interested parties to understand and view the complete complex-wide picture. A common application allows identification of total waste volumes, material classes, disposition sites, choke points, and technological or regulatory barriers to treatment and disposal. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, has completed the deployment of this fully operational, web-based forecast system. New functional modules and annual waste forecast data updates have been added to ensure the long-term viability and value of this system. In conclusion: WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. WIMS has replaced the historic process of each DOE site gathering, organizing, and reporting their waste forecast information utilizing different database and display technologies. In addition, WIMS meets DOE's objective to have the complex-wide waste forecast information available to all stakeholders and the public in one easy-to-navigate system

  13. Synthesis, structure refinement at 296 K and physico-chemical characterizations of KMnHP{sub 3}O{sub 10}

    SciTech Connect (OSTI)

    Mechergui, J.; Belam, W.

    2008-12-01

    Potassium manganese(III) monohydrogentriphosphate KMnHP{sub 3}O{sub 10} was synthesized by flux method and characterized by single-crystal X-ray diffraction, crystallizes in the monoclinic system with centric space group C2/c. The parameters of the unit cell are a = 12.104(1), b = 8.287(1). c = 9.150(1) A, {beta} = 110.97(1) deg. and Z = 4. The structure was solved at 296 K using 893 independent reflections and refined until R(F) = 0.022; wR(F{sup 2}) = 0.045. The atomic arrangement of the title compound consists of MnO{sub 6} octahedra linked by hydrogentriphosphate anions to form a three-dimensional framework containing tunnels parallel to the c-axis where the K{sup +} cations are inserted. The structure of KMnHP{sub 3}O{sub 10} contains a single Mn site which is surrounded by typical Jahn-Teller [2 + 2 + 2] distorted octahedron. The title material has been also characterized by different physico-chemical techniques: powder X-ray diffraction, IR, NMR and CI spectroscopies and DTA-TGA-DSC thermal analysis.

  14. DOE ZERH Webinar: Quality Management Systems for ZERH

    Broader source: Energy.gov [DOE]

    Description:The session will provide background and guidance for how Zero Energy Ready Home builders can integrate a quality management program in their business. The focus will be on facilitating...

  15. Earned Value Management System (EVMS) Roadside Assist Visit.

    Broader source: Energy.gov [DOE]

    On April 4-7, 2016, the Office of Project Management Oversight and Assessments (PM) will travel to Portsmouth, OH and West Valley NY, for meetings with Fluor-BWXT Portsmouth, LLC (FBP) and CH2M...

  16. Los Alamos hybrid environment: an integrated development/configuration management system

    SciTech Connect (OSTI)

    Cort, G.

    1984-01-01

    I present the details of a hybrid configuration management system that utilizes a commercial configuration management tool (Softool's Change and Configuration Control environment) to monitor and control the development of mission-critical software systems at the Los Alamos Weapons Neutron Research Facility. The hybrid system combines features of the VMS host operating system and elements of the tool environment to integrate a flexible development environment with a very powerful automated configuration management system. The features of this system are presented with particular emphasis on the benefits of the hybrid approach. The complementary nature of the constituent environments is described. Special attention is given the issues of operational tradeoffs, personnel interaction and utilization, management visibility and overall system performance. It is shown that by employing a special interface data structure, the hybrid environment supports a much higher level of automation (of both development and configuration management activities) than is realizable in either environment individually. Examples are provided to illustrate the extent to which development activities and all phases of configuration management can be automated under this system. It is shown that in the process of providing a rigorous configuration management environment, the system remains virtually transparent to software development personnel and actually enhances the programmer's capabilities.

  17. Main Principles of the Perspective System of SNF Management in Russia - 13333

    SciTech Connect (OSTI)

    Baryshnikov, Mikhail

    2013-07-01

    For the last several years the System of the Spent Nuclear Fuel management in Russia was seriously changed. The paper describes the main principles of the changes and the bases of the Perspective System of SNF Management in Russia. Among such the bases there are the theses with the interesting names like 'total knowledge', 'pollutant pays' and 'pay and forget'. There is also a brief description of the modern Russian SNF Management Infrastructure. And an outline of the whole System. The System which is - in case of Russia - is quite necessary to adjust SNF accumulation and to utilize the nuclear heritage. (authors)

  18. Electronic Document Management System PIA, BechtelJacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs ...

  19. Cyber-Intrusion Auto-Response Policy and Management System (CAPMS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cyber-Intrusion Auto-Response Policy and Management System (CAPMS) A managed security system that integrates advanced cybersecurity algorithms with energy delivery systems to respond autonomously to cyber intrusions while sustaining critical energy delivery functions Background Cyber attacks are becoming more sophisticated every day. Electric utilities are faced with the challenge of detecting, analyzing, and responding to cyber incidents to protect public safety and preserve the integrity of

  20. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    SciTech Connect (OSTI)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  1. Local rules for protein folding on a triangular lattice and generalized hydrophobicity in the HP model

    SciTech Connect (OSTI)

    Agarwala, R. [National Institutes of Health, Bethesda, MD (United States); Batzoglou, S. [MIT Lab. for Computer Science, Cambridge, MA (United States); Dancik, V. [Univ. of Southern California, Los Angeles, CA (United States)] [and others

    1997-12-01

    A long standing problem in molecular biology is to determine the three-dimensional structure of a protein, given its amino acid sequence. A variety of simplifying models have been proposed abstracting only the {open_quotes}essential physical properties{close_quotes} of real proteins. In these models, the three dimensional space is often represented by a lattice. Residues which are adjacent in the primary sequence (i.e. covalently linked) must be placed at adjacent points in the lattice. A conformation of a protein is simply a self-avoiding walk along the lattice. The protein folding problem STRING-FOLD is that of finding a conformation of the protein sequence on the lattice such that the overall energy is minimized, for some reasonable definition of energy. This formulation leaves open the choices of a lattice and an energy function. Once these choices are made, one may then address the algorithmic complexity of optimizing the energy function for the lattice. For a variety of such simple models, this minimization problem is in fact NP-hard. In this paper, we consider the Hydrophobic-Polar (HP) Model introduced by Dill. The HP model abstracts the problem by grouping the 20 amino acids into two classes: hydrophobic (or non-polar) residues and hydrophilic (or polar) residues. For concreteness, we will take our input to be a string from (H,P){sup +}, where P represents polar residues, and H represents hydrophobic residues. Dill et.al. survey the literature analyzing this model. 8 refs., 2 figs., 1 tab.

  2. System-wide power management control via clock distribution network

    DOE Patents [OSTI]

    Coteus, Paul W.; Gara, Alan; Gooding, Thomas M.; Haring, Rudolf A.; Kopcsay, Gerard V.; Liebsch, Thomas A.; Reed, Don D.

    2015-05-19

    An apparatus, method and computer program product for automatically controlling power dissipation of a parallel computing system that includes a plurality of processors. A computing device issues a command to the parallel computing system. A clock pulse-width modulator encodes the command in a system clock signal to be distributed to the plurality of processors. The plurality of processors in the parallel computing system receive the system clock signal including the encoded command, and adjusts power dissipation according to the encoded command.

  3. V-226: HP StoreOnce D2D Backup Systems Denial of Service Vulnerability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to version 2.3.0 or 1.2.19. Addthis Related Articles U-226: Linux Kernel SFC Driver TCP MSS Option Handling Denial of Service Vulnerability V-062: Asterisk Two Denial of...

  4. DualTrust: A Trust Management Model for Swarm-Based Autonomic Computing Systems

    SciTech Connect (OSTI)

    Maiden, Wendy M.

    2010-05-01

    Trust management techniques must be adapted to the unique needs of the application architectures and problem domains to which they are applied. For autonomic computing systems that utilize mobile agents and ant colony algorithms for their sensor layer, certain characteristics of the mobile agent ant swarm -- their lightweight, ephemeral nature and indirect communication -- make this adaptation especially challenging. This thesis looks at the trust issues and opportunities in swarm-based autonomic computing systems and finds that by monitoring the trustworthiness of the autonomic managers rather than the swarming sensors, the trust management problem becomes much more scalable and still serves to protect the swarm. After analyzing the applicability of trust management research as it has been applied to architectures with similar characteristics, this thesis specifies the required characteristics for trust management mechanisms used to monitor the trustworthiness of entities in a swarm-based autonomic computing system and describes a trust model that meets these requirements.

  5. Systems and methods for managing shared-path instrumentation and irradiation targets in a nuclear reactor

    DOE Patents [OSTI]

    Heinold, Mark R.; Berger, John F.; Loper, Milton H.; Runkle, Gary A.

    2015-12-29

    Systems and methods permit discriminate access to nuclear reactors. Systems provide penetration pathways to irradiation target loading and offloading systems, instrumentation systems, and other external systems at desired times, while limiting such access during undesired times. Systems use selection mechanisms that can be strategically positioned for space sharing to connect only desired systems to a reactor. Selection mechanisms include distinct paths, forks, diverters, turntables, and other types of selectors. Management methods with such systems permits use of the nuclear reactor and penetration pathways between different systems and functions, simultaneously and at only distinct desired times. Existing TIP drives and other known instrumentation and plant systems are useable with access management systems and methods, which can be used in any nuclear plant with access restrictions.

  6. Inventory processes for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Wilson, D.

    1998-08-24

    Inventory records are maintained in the following inventory systems: HIP, (Spare Parts), WIM, (General Supplies): Convenient Storage, Shop Stock, Essential Materials, Special Tools, ESP (Excess Inventory). Requisitions for replenishment of inventory items are initiated in the respective inventory system and then forwarded to the purchasing system.

  7. CRAD, Management- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Management at the Office of River Protection K Basin Sludge Waste System.

  8. CRAD, Emergency Management- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System.

  9. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  10. T-606: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data

    Broader source: Energy.gov [DOE]

    Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data.

  11. Order Module--DOE G 450.4-1B, INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE

    Broader source: Energy.gov [DOE]

    This Guide has two purposes. One purpose is to assist DOE contractors in developing, describing, and implementing an ISMS to comply with DOE P 450.4, Safety Management system Policy; DOE P 450.5,...

  12. 31 TAC 15.3 - Management of the Beach/Dune System Administration...

    Open Energy Info (EERE)

    TAC 15.3 - Management of the BeachDune System Administration Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 31 TAC 15.3 -...

  13. Building America Top Innovations 2013 Profile – Quality Management System Guidelines

    SciTech Connect (OSTI)

    none,

    2013-09-01

    This Top Innovation profile describes quality management system tools that were customized for residential construction by BSC, IBACOS, and PHI, for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework.

  14. Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM

    Broader source: Energy.gov [DOE]

    The familiar level of this module is designed to summarize the basic information in DOE O 151.1C, Comprehensive Emergency Management System. This module is divided into two sections. in the first...

  15. AAC R-18-8-260 Hazardous Waste Management System | Open Energy...

    Open Energy Info (EERE)

    AAC R-18-8-260 Hazardous Waste Management System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: AAC R-18-8-260 Hazardous...

  16. NAC 444.731 - Class III Solid Waste Management Systems | Open...

    Open Energy Info (EERE)

    .731 - Class III Solid Waste Management Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC 444.731 - Class III...

  17. Stand-Alone Battery Thermal Management System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy The stack characterization system (SCS) is a tele-operated remote system that collects samples and data to characterize the quantitative and qualitative levels of contamination inside off-gas stacks protecting workers from the physical, radiological and chemical hazards of deteriorating contaminated stacks. Stack Characterization System for Inspection of Contaminated Off-Gas Stacks (130.58 KB) More Documents & Publications Uranium Downblending and Disposition

  18. Best Management Practice #3: Distribution System Audits, Leak...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Leaks in distribution systems are caused by a number of factors, including pipe corrosion, ... Cathodic protection controls corrosion of metal surfaces by supplying an electrical ...

  19. Cloud-Based Transportation Management System Delivers Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    reduce transportation costs. The Department of Energy (DOE) Office of Packaging & Transportation (OPT) implemented ATLAS (Automated Transportation Logistics & Analysis System), a ...

  20. Memorandum, Managed Phase Out of Halon Fixed Fire Suppression Systems- May 5, 1993

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to provide additional interim departmental criteria on the management of the reduction and potential elimination of Halon fire extinguishing systems within the Department of Energy (DOE). This memorandum supplements the joint Office of Safety and Quality Assurance/Office of Projects and Facilities Management memorandum of September 27, 1990, in which guidance was provided on the installation of new Halon 1301 fixed fire suppression systems and halon 1211 portable fire extinguishers.

  1. System and method of vehicle operating condition management

    DOE Patents [OSTI]

    Sujan, Vivek A.; Vajapeyazula, Phani; Follen, Kenneth; Wu, An; Moffett, Barty L.

    2015-10-20

    A vehicle operating condition profile can be determined over a given route while also considering imposed constraints such as deviation from time targets, deviation from maximum governed speed limits, etc. Given current vehicle speed, engine state and transmission state, the present disclosure optimally manages the engine map and transmission to provide a recommended vehicle operating condition that optimizes fuel consumption in transitioning from one vehicle state to a target state. Exemplary embodiments provide for offline and online optimizations relative to fuel consumption. The benefit is increased freight efficiency in transporting cargo from source to destination by minimizing fuel consumption and maintaining drivability.

  2. Abstract: Air, Thermal and Water Management for PEM Fuel Cell Systems

    SciTech Connect (OSTI)

    Mark K. Gee Zia Mirza

    2008-10-01

    PEM fuel cells are excellent candidates for transportation applications due to their high efficiencies. PEM fuel cell Balance of Plant (BOP) components, such as air, thermal, and water management sub-systems, can have a significant effect on the overall system performance, but have traditionally not been addressed in research and development efforts. Recognizing this, the U.S. Department of Energy and Honeywell International Inc. are funding an effort that emphasizes the integration and optimization of air, thermal and water management sub-systems. This effort is one of the major elements to assist the fuel cell system developers and original equipment manufacturers to achieve the goal of an affordable and efficient power system for transportation applications. Past work consisted of: (1) Analysis, design, and fabrication of a motor driven turbocompressor. (2) A systematic trade study to select the most promising water and thermal management systems from five different concepts (absorbent wheel humidifier, gas to gas membrane humidifier, porous metal foam humidifier, cathode recycle compressor, and water injection pump.) This presentation will discuss progress made in the research and development of air, water and thermal management sub-systems for PEM fuel cell systems in transportation applications. More specifically, the presentation will discuss: (1) Progress of the motor driven turbocompressor design and testing; (2) Progress of the humidification component selection and testing; and (3) Progress of the thermal management component preliminary design. The programs consist of: (1) The analysis, design, fabrication and testing of a compact motor driven turbocompressor operating on foil air bearings to provide contamination free compressed air to the fuel cell stack while recovering energy from the exhaust streams to improve system efficiency. (2) The analysis, design, fabrication and testing of selected water and thermal management systems and components to

  3. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    SciTech Connect (OSTI)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  4. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

    P...

  5. Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia

    SciTech Connect (OSTI)

    Sueiae, S.; Fabjan, M.; Hrastar, U.; Mali, T.; Steinkuhler, C.; Lenie, K.

    2008-07-01

    The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment of institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a software

  6. Energy-aware Thread and Data Management in Heterogeneous Multi-core, Multi-memory Systems

    SciTech Connect (OSTI)

    Su, Chun-Yi

    2014-12-16

    By 2004, microprocessor design focused on multicore scaling—increasing the number of cores per die in each generation—as the primary strategy for improving performance. These multicore processors typically equip multiple memory subsystems to improve data throughput. In addition, these systems employ heterogeneous processors such as GPUs and heterogeneous memories like non-volatile memory to improve performance, capacity, and energy efficiency. With the increasing volume of hardware resources and system complexity caused by heterogeneity, future systems will require intelligent ways to manage hardware resources. Early research to improve performance and energy efficiency on heterogeneous, multi-core, multi-memory systems focused on tuning a single primitive or at best a few primitives in the systems. The key limitation of past efforts is their lack of a holistic approach to resource management that balances the tradeoff between performance and energy consumption. In addition, the shift from simple, homogeneous systems to these heterogeneous, multicore, multi-memory systems requires in-depth understanding of efficient resource management for scalable execution, including new models that capture the interchange between performance and energy, smarter resource management strategies, and novel low-level performance/energy tuning primitives and runtime systems. Tuning an application to control available resources efficiently has become a daunting challenge; managing resources in automation is still a dark art since the tradeoffs among programming, energy, and performance remain insufficiently understood. In this dissertation, I have developed theories, models, and resource management techniques to enable energy-efficient execution of parallel applications through thread and data management in these heterogeneous multi-core, multi-memory systems. I study the effect of dynamic concurrent throttling on the performance and energy of multi-core, non-uniform memory access

  7. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  8. Preliminary characterization of risks in the nuclear waste management system based on information in the literature

    SciTech Connect (OSTI)

    Daling, P.M.; Rhoads, R.E.; Van Luick, A.E.; Fecht, B.A.; Nilson, S.A.; Sevigny, N.L.; Armstrong, G.R.; Hill, D.H.; Rowe, M.; Stern, E.

    1992-01-01

    This document presents preliminary information on the radiological and nonradiological risks in the nuclear waste management system. The objective of the study was to (1) review the literature containing information on risks in the nuclear waste management system and (2) use this information to develop preliminary estimates of the potential magnitude of these risks. Information was collected on a broad range of risk categories to assist the US Department of Energy (DOE) in communicating information about the risks in the waste management systems. The study examined all of the portions of the nuclear waste management system currently expected to be developed by the DOE. The scope of this document includes the potential repository, the integral MRS facility, and the transportation system that supports the potential repository and the MRS facility. Relevant literature was reviewed for several potential repository sites and geologic media. A wide range of ``risk categories`` are addressed in this report: (1) public and occupational risks from accidents that could release radiological materials, (2) public and occupational radiation exposure resulting from routine operations, (3) public and occupational risks from accidents involving hazards other than radioactive materials, and (4) public and occupational risks from exposure to nonradioactive hazardous materials during routine operations. The report is intended to provide a broad spectrum of risk-related information about the waste management system. This information is intended to be helpful for planning future studies.

  9. Office of River Protection Integrated Safety Management System Description

    SciTech Connect (OSTI)

    CLARK, D.L.

    1999-08-09

    Revision O was never issued. Finding safe and environmentally sound methods of storage and disposal of 54 million gallons of highly radioactive waste contained in 177 underground tanks is the largest challenge of Hanford cleanup. TWRS was established in 1991 and continues to integrate all aspects of the treatment and management of the high-level radioactive waste tanks. In fiscal Year 1997, program objectives were advanced in a number of areas. RL TWRS refocused the program toward retrieving, treating, and immobilizing the tank wastes, while maintaining safety as first priority. Moving from a mode of storing the wastes to getting the waste out of the tanks will provide the greatest cleanup return on the investment and eliminate costly mortgage continuance. There were a number of safety-related achievements in FY1997. The first high priority safety issue was resolved with the removal of 16 tanks from the ''Wyden Watch List''. The list, brought forward by Senator Ron Wyden of Oregon, identified various Hanford safety issues needing attention. One of these issues was ferrocyanide, a chemical present in 24 tanks. Although ferrocyanide can ignite at high temperature, analysis found that the chemical has decomposed into harmless compounds and is no longer a concern.

  10. Supplement Analysis for the Transmission System Vegetation Management Program FEIS

    SciTech Connect (OSTI)

    N /A

    2001-03-27

    BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa--Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. (1) Description of right-of-way and vegetation management needed--The project involves cutting all tall growing trees and brush within BPA's 100-foot wide transmission line right-of-way. An encroachment by the City of Bend Sewer Treatment facility, and future expansion plans, compelled the relocation of this portion of the right-of-way. Structures 18/2 and 18/4 will be modified in place to accommodate the new angle of the right-of-way. Structure 18/3 will be moved approximately 300 feet westerly to allow for the expansion of the sewer treatment facility. Only vegetation within the new portion of the right-of-way, totaling approximately 3.5 acres, will be controlled. No herbicides will be used on this project. Vegetation to be controlled: Juniper trees are the only tall growing tree species within this portion of the right-of-way requiring treatment. The density of vegetation within the new right-of-way is light to medium. The right-of-way boundaries will be examined for danger trees and if found, danger trees will be marked and cut according to danger tree policy.

  11. Development of a Carbon Management Geographic Information System (GIS) for the United States

    SciTech Connect (OSTI)

    Howard Herzog; Holly Javedan

    2009-12-31

    In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Cost Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.

  12. Real-time performance monitoring and management system

    DOE Patents [OSTI]

    Budhraja, Vikram S.; Dyer, James D.; Martinez Morales, Carlos A.

    2007-06-19

    A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

  13. Methods and systems for seed planting management and control

    DOE Patents [OSTI]

    Svoboda, John M.; Hess, J. Richard; Hoskinson, Reed L.; Harker, David J.

    2002-01-01

    A seed planting system providing optimal seed spacing in an agricultural field. The seed planting system includes a mobile seed planter having one or more planting shoes, or members being adapted for towing by a farm vehicle or being self-propelled. Sensors, disposed proximate to respective planting shoes, detect seed planting events and send corresponding signals to a computer. Contemporaneously, a geospatial locator acquires, and transmits to the computer, the geospatial location of each planted seed. The computer correlates the geospatial location data with the seed deposition data and generates a seed distribution profile indicating the location of each seed planted in a zone of interest to enable the control of speed spacing.

  14. Method of sealing casings of subsurface materials management system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kostelnik, Kevin M.; Sloan, Paul A.

    2007-02-06

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  15. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    GARRISON, R.C.

    2000-11-28

    This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

  16. Generic Natural Systems Evaluation - Thermodynamic Database Development and Data Management

    SciTech Connect (OSTI)

    Wolery, T W; Sutton, M

    2011-09-19

    Thermodynamic data are essential for understanding and evaluating geochemical processes, as by speciation-solubility calculations, reaction-path modeling, or reactive transport simulation. These data are required to evaluate both equilibrium states and the kinetic approach to such states (via the affinity term or its equivalent in commonly used rate laws). These types of calculations and the data needed to carry them out are a central feature of geochemistry in many applications, including water-rock interactions in natural systems at low and high temperatures. Such calculations are also made in engineering studies, for example studies of interactions involving man-made materials such as metal alloys and concrete. They are used in a fairly broad spectrum of repository studies where interactions take place among water, rock, and man-made materials (e.g., usage on YMP and WIPP). Waste form degradation, engineered barrier system performance, and near-field and far-field transport typically incorporate some level of thermodynamic modeling, requiring the relevant supporting data. Typical applications of thermodynamic modeling involve calculations of aqueous speciation (which is of great importance in the case of most radionuclides), solubilities of minerals and related solids, solubilities of gases, and stability relations among the various possible phases that might be present in a chemical system at a given temperature and pressure. If a phase can have a variable chemical composition, then a common calculational task is to determine that composition. Thermodynamic modeling also encompasses ion exchange and surface complexation processes. Any and all of these processes may be important in a geochemical process or reactive transport calculation. Such calculations are generally carried out using computer codes. For geochemical modeling calculations, codes such as EQ3/6 and PHREEQC, are commonly used. These codes typically provide 'full service' geochemistry, meaning that

  17. National information network and database system of hazardous waste management in China

    SciTech Connect (OSTI)

    Ma Hongchang

    1996-12-31

    Industries in China generate large volumes of hazardous waste, which makes it essential for the nation to pay more attention to hazardous waste management. National laws and regulations, waste surveys, and manifest tracking and permission systems have been initiated. Some centralized hazardous waste disposal facilities are under construction. China`s National Environmental Protection Agency (NEPA) has also obtained valuable information on hazardous waste management from developed countries. To effectively share this information with local environmental protection bureaus, NEPA developed a national information network and database system for hazardous waste management. This information network will have such functions as information collection, inquiry, and connection. The long-term objective is to establish and develop a national and local hazardous waste management information network. This network will significantly help decision makers and researchers because it will be easy to obtain information (e.g., experiences of developed countries in hazardous waste management) to enhance hazardous waste management in China. The information network consists of five parts: technology consulting, import-export management, regulation inquiry, waste survey, and literature inquiry.

  18. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  19. Calculation of Ambient (H*(10)) and Personal (Hp(10)) Dose Equivalent from a 252Cf Neutron Source

    SciTech Connect (OSTI)

    Traub, Richard J.

    2010-03-26

    The purpose of this calculation is to calculate the neutron dose factors for the Sr-Cf-3000 neutron source that is located in the 318 low scatter room (LSR). The dose factors were based on the dose conversion factors published in ICRP-21 Appendix 6, and the Ambient dose equivalent (H*(10)) and Personal dose equivalent (Hp(10)) dose factors published in ICRP Publication 74.

  20. Virginia Tech Operating System (OS) built on VOLTTRONTM for Energy Management in Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Murat Kuzlu (mkuzlu@vt.edu) Virginia Tech Virginia Tech Operating System (OS) built on VOLTTRON TM for Energy Management in Buildings HVAC Controllers Lighting Controllers Lighting circuit(s) Plug load Controllers July 24, 2014 Plug load circuit(s) Manisa Pipattanasomporn (mpipatta@vt.edu) Virginia Tech 2 Outline System architecture - VT OS Software architecture - VT OS Operating system and framework layer implemented using VOLTTRON TM Device Discovery Agent Live Demonstration 3 ZigBee mesh

  1. Comparison of properties and microstructures of Trefimetaux and Hycon 3HP{trademark} after neutron irradiation

    SciTech Connect (OSTI)

    Edwards, D.J.; Singh, B.N.; Toft, P.; Eldrup, M.

    1998-09-01

    The precipitation strengthened CuNiBe alloys are among three candidate copper alloys being evaluated for application in the first wall, divertor, and limiter components of ITER. Generally, CuNiBe alloys have higher strength but poorer conductivity compared to CuCrZr and CuAl{sub 2}O{sub 3} alloys. Brush-Wellman Inc. has manufactured an improved version of their Hycon CuNiBe alloy that has higher conductivity while maintaining a reasonable level strength. It is of interest, therefore, to investigate the effect of radiation on the physical and mechanical properties of this alloy. In the present work the authors have investigated the physical and mechanical properties of the Hycon 3HP{trademark} alloy both before and after neutron irradiation and have compared its microstructure and properties with the European CuNiBe candidate alloy manufactured by Trefirmetaux. Tensile specimens of both alloys were irradiated in the DR-3 reactor at Risoe to displacement dose levels up to 0.3 dpa at 100, 250 and 350 C. Both alloys were tensile tested in the unirradiated and irradiated conditions at 100, 250 and 350 C. Both pre- and post-irradiation microstructures of the alloys were investigated in detail using transmission electron microscopy. Fracture surfaces were examined under a scanning electron microscope. Electrical resistivity measurements were made on tensile specimens before and after irradiation; all measurements were made at 23 C. At this point it seems unlikely that CuNiBe alloys can be recommended for applications in neutron environments where the irradiation temperature exceeds 200 C. Applications at temperatures below 200 C might be plausible, but only after careful experiments have determined the dose dependence of the mechanical properties and the effect of sudden temperature excursions on the material to establish the limits on the use of the alloy.

  2. A multi-echelon supply chain model for municipal solid waste management system

    SciTech Connect (OSTI)

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-15

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

  3. Geographic Information Systems-Transportation ISTEA management systems server-net prototype pooled fund study: Phase B summary

    SciTech Connect (OSTI)

    Espinoza, J. Jr.; Dean, C.D.; Armstrong, H.M.

    1997-06-01

    The Geographic Information System-Transportation (GIS-T) ISTEA Management Systems Server Net Prototype Pooled Fund Study represents the first national cooperative effort in the transportation industry to address the management and monitoring systems as well as the statewide and metropolitan transportation planning requirements of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The Study was initiated in November 1993 through the Alliance for Transportation Research and under the leadership of the New Mexico State Highway and Transportation Department. Sandia National Laboratories, an Alliance partner, and Geographic Paradigm Computing. Inc. provided technical leadership for the project. In 1992, the Alliance for Transportation Research, the New Mexico State Highway and Transportation Department, Sandia National Laboratories, and Geographic Paradigm Computing, Inc., proposed a comprehensive research agenda for GIS-T. That program outlined a national effort to synthesize new transportation policy initiatives (e.g., management systems and Intelligent Transportation Systems) with the GIS-T server net ideas contained in the NCHRP project {open_quotes}Adaptation of GIS to Transportation{close_quotes}. After much consultation with state, federal, and private interests, a project proposal based on this agenda was prepared and resulted in this Study. The general objective of the Study was to develop GIS-T server net prototypes supporting the ISTEA requirements for transportation planning and management and monitoring systems. This objective can be further qualified to: (1) Create integrated information system architectures and design requirements encompassing transportation planning activities and data. (2) Encourage the development of functional GIS-T server net prototypes. (3) Demonstrate multiple information systems implemented in a server net environment.

  4. Design an optimum safety policy for personnel safety management - A system dynamic approach

    SciTech Connect (OSTI)

    Balaji, P.

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  5. CAD-centric Computation Management System for a Virtual TBM

    SciTech Connect (OSTI)

    Ramakanth Munipalli; K.Y. Szema; P.Y. Huang; C.M. Rowell; A.Ying; M. Abdou

    2011-05-03

    HyPerComp Inc. in research collaboration with TEXCEL has set out to build a Virtual Test Blanket Module (VTBM) computational system to address the need in contemporary fusion research for simulating the integrated behavior of the blanket, divertor and plasma facing components in a fusion environment. Physical phenomena to be considered in a VTBM will include fluid flow, heat transfer, mass transfer, neutronics, structural mechanics and electromagnetics. We seek to integrate well established (third-party) simulation software in various disciplines mentioned above. The integrated modeling process will enable user groups to interoperate using a common modeling platform at various stages of the analysis. Since CAD is at the core of the simulation (as opposed to computational meshes which are different for each problem,) VTBM will have a well developed CAD interface, governing CAD model editing, cleanup, parameter extraction, model deformation (based on simulation,) CAD-based data interpolation. In Phase-I, we built the CAD-hub of the proposed VTBM and demonstrated its use in modeling a liquid breeder blanket module with coupled MHD and structural mechanics using HIMAG and ANSYS. A complete graphical user interface of the VTBM was created, which will form the foundation of any future development. Conservative data interpolation via CAD (as opposed to mesh-based transfer), the regeneration of CAD models based upon computed deflections, are among the other highlights of phase-I activity.

  6. User`s guide to the FFTF Plant Operational Data Management System (B1039)

    SciTech Connect (OSTI)

    Nelson, J.V. Jr.

    1994-07-25

    The FFTF Plant Operational Data Management (PODM) System provides capabilities for storing, managing and retrieving data recorded by FFTF plant computers [the Plant Data System (PDS), in particular]. The PODM system is currently implemented on SUN{sup TM} Workstations{sup (R)}. This guide contains a description of the PODM System, and instructions for using programs available for retrieving and processing FFTF data stored in the data base. Section 2.0 provides a brief overview and the background of the system. The organization and content of the data base are described in more detail in Sections 3.0 and 4.0. Available computer programs are described in sections 5.0 and 6.0 while subroutines that can be called by a user`s FORTRAN program are described in section 7.0.

  7. The Wide-area Energy Management System Phase 2 Final Report

    SciTech Connect (OSTI)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resulting system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.

  8. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    SciTech Connect (OSTI)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.

  9. Acquisition Letter 11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H

    Broader source: Energy.gov [DOE]

    This Acquisition Letter (AL) implements compliance enforcement mechanisms in the form of business systems clause and related clauses that requires the contractor to have acceptable business systems that comply with system criteria. The contractor will be required to have acceptable business systems for cost estimating, accounting, earned value management, purchasing and property management. When a contractor's business system contains identified significant deficiencies, the contracting officer will be able to withhold a percentage of payments in accordance with the applicable system clause.

  10. Next Generation Natural Gas Vehicle Program Phase I: Clean Air Partners 0.5 g/hp-h NOx Engine Concept; Final Report

    SciTech Connect (OSTI)

    Wong, H. C.

    2003-07-01

    Subcontractor report details work done by Clean Air Partners to develop 0.5 g/hp-h NOx natural gas engine exhaust gas recirculation (EGR) technology for the Next Generation Natural Gas Vehicle Program.

  11. An SAR-compliant radionuclide inventory management system for a DOE research and development laboratory

    SciTech Connect (OSTI)

    O'Kula, K.R.; Lux, C.R.; Clements, J.A.

    2000-07-01

    The US Department of Energy Complex contains many laboratories that require inventory management and control of large stores of radionuclides. While the overall quantities of radionuclides are bounded by Authorization-Basis (AB) documents, the spatial distribution may change rapidly according to facility experimentation and storage limits. Thus, the consequences of postulated accident events may be difficult to quantify as the location of radiological species becomes uncertain. Furthermore, a situation of this nature may be compounded by management of fissile materials in the same laboratory. Although radionuclide inventory management, fissile material control, and compliance with AB limits may be handled individually, a systematic and consistent approach would be to integrate all three functions. A system with these characteristics, an upgraded Radionuclide Inventory and Administrative Control (RI-AC) System, has been implemented for the Savannah River Technology Center (SRTC) located on the Savannah River Site (SRS), and is summarized in this paper.

  12. Chemical Safety Management Program for Lockheed Martin Energy Systems operations at the Y-12 Plant

    SciTech Connect (OSTI)

    C.W. McMahon

    2000-03-24

    Operated by Lockheed Martin Energy Systems (Energy Systems), the Department of Energy (DOE) Oak Ridge Y-12 Plant is a manufacturing facility that plays an integral role in the DOE nuclear weapons complex. Fulfilling the national security mission at the Y-12 Plant, continuing to be the cornerstone of uranium and lithium technologies for DOE, and providing customers with solutions for challenging manufacturing needs requires usage of a variety of chemicals and chemical processes. Performing this work safely while protecting workers, the public, and the environment is their commitment. The purpose of this document is to provide a description of the essential components of chemical safety, the integration of these components into the Y-12 Integrated Safety Management System (ISMS), and the functional integration of chemical safety issues across Y-12 organizations and programs managed by Energy Systems.

  13. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    GARRISON, R.C.

    2000-09-22

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management.

  14. DEVELOPMENT OF A CARBON MANAGEMENT GEOGRAPHIC INFORMATION SYSTEM (GIS) FOR THE UNITED STATES

    SciTech Connect (OSTI)

    Howard J. Herzog

    2004-03-01

    The Lab for Energy and Environment (LFEE) at MIT is developing a Geographic Information System (GIS) for carbon management. The GIS will store, integrate, and manipulate information relating to the components of carbon management systems. Additionally, the GIS can be used to interpret and analyze the effect of developing these systems. In the first year of this three year project, we focused on two tasks: (1) specifying the system design--defining in detail the GIS data requirements, the types of analyses that can be conducted, and the forms of output we will produce, as well as designing the computer architecture of the GIS and (2) creating the ''core'' datasets--identifying data sources and converting them into a form accessible by the GIS.

  15. LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS

    SciTech Connect (OSTI)

    Ray Fink

    2006-10-01

    The results from ten cyber security vulnerability assessments of process control, SCADA and energy management systems, or components of those systems were reviewed to identify common problem areas. The common vulnerabilities ranged from conventional IT security issues to specific weaknesses in control system protocols. In each vulnerability category, relative measures were assigned to the severity of the vulnerability and ease with which an attacker could exploit the vulnerability. Suggested mitigations are identified in each category. Recommended mitigations having the highest impact on reducing vulnerability are listed for asset owners and system vendors.

  16. Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This Guide provides the Department of Energy's federal project directors with the methodologies and tools needed to plan, implement and complete assigned projects using a Systems Engineering approach in accordance with the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. No cancellations.

  17. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    SciTech Connect (OSTI)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation.

  18. Manual for Nuclear Materials Management and Safeguards System Reporting and Data Submission

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-08-19

    The manual provides detailed instructions for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE M 474.1-2. Canceled by DOE M 470.4-6.

  19. Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users

    National Nuclear Security Administration (NNSA)

    April 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users Training Meeting will be held May 12-15, 2014, in Denver, Colorado. NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial nuclear facilities. The data serve a critical

  20. 2013 Federal Energy and Water Management Award Winner Naval Sea Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Command | Department of Energy Naval Sea Systems Command 2013 Federal Energy and Water Management Award Winner Naval Sea Systems Command fewm13_nswcphiladelphia_highres.pdf (5.43 MB) fewm13_nswcphiladelphia.pdf (1.75 MB) More Documents & Publications CX-005670: Categorical Exclusion Determination U.S. Navy Marine Diesel Engines and the Environment - Part 1 EIS-0259: Record of Decision

  1. Waste Receiving and Processing Facility Module 1 Data Management System Software Requirements Specification

    SciTech Connect (OSTI)

    Brann, E.C. II

    1994-09-09

    This document provides the software requirements for Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  2. The Integrated Waste Tracking Systems (IWTS) - A Comprehensive Waste Management Tool

    SciTech Connect (OSTI)

    Robert S. Anderson

    2005-09-01

    The US Department of Energy (DOE) Idaho National Laboratory (INL) site located near Idaho Falls, ID USA, has developed a comprehensive waste management and tracking tool that integrates multiple operational activities with characterization data from waste declaration through final waste disposition. The Integrated Waste Tracking System (IWTS) provides information necessary to help facility personnel properly manage their waste and demonstrate a wide range of legal and regulatory compliance. As a client?server database system, the IWTS is a proven tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of flexibility. This paper describes some of the history involved with the development and current use of IWTS as a comprehensive waste management tool as well as a discussion of IWTS deployments performed by the INL for outside clients. Waste management spans a wide range of activities including: work group interactions, regulatory compliance management, reporting, procedure management, and similar activities. The IWTS documents these activities and performs tasks in a computer-automated environment. Waste characterization data, container characterization data, shipments, waste processing, disposals, reporting, and limit compliance checks are just a few of the items that IWTS documents and performs to help waste management personnel perform their jobs. Throughout most hazardous and radioactive waste generating, storage and disposal sites, waste management is performed by many different groups of people in many facilities. Several organizations administer their areas of waste management using their own procedures and documentation independent of other organizations. Files are kept, some of which are treated as quality records, others not as stringent. Quality records maintain a history of: changes performed after approval, the reason for the change(s), and a record of whom and when

  3. Review of LCA studies of solid waste management systems – Part I: Lessons learned and perspectives

    SciTech Connect (OSTI)

    Laurent, Alexis; Bakas, Ioannis; Clavreul, Julie; Bernstad, Anna; Niero, Monia; Gentil, Emmanuel; Hauschild, Michael Z.; Christensen, Thomas H.

    2014-03-01

    Highlights: • We perform a critical review of 222 LCA studies of solid waste management systems. • Studies mainly concentrated in Europe with little application in developing countries. • Assessments of relevant waste types apart from household waste have been overlooked. • Local specificities of systems prevent a meaningful generalisation of the LCA results. • LCA should support recommendations representative of the local conditions. - Abstract: The continuously increasing solid waste generation worldwide calls for management strategies that integrate concerns for environmental sustainability. By quantifying environmental impacts of systems, life cycle assessment (LCA) is a tool, which can contribute to answer that call. But how, where and to which extent has it been applied to solid waste management systems (SWMSs) until now, and which lessons can be learnt from the findings of these LCA applications? To address these questions, we performed a critical review of 222 published LCA studies of SWMS. We first analysed the geographic distribution and found that the published studies have primarily been concentrated in Europe with little application in developing countries. In terms of technological coverage, they have largely overlooked application of LCA to waste prevention activities and to relevant waste types apart from household waste, e.g. construction and demolition waste. Waste management practitioners are thus encouraged to abridge these gaps in future applications of LCA. In addition to this contextual analysis, we also evaluated the findings of selected studies of good quality and found that there is little agreement in the conclusions among them. The strong dependence of each SWMS on local conditions, such as waste composition or energy system, prevents a meaningful generalisation of the LCA results as we find it in the waste hierarchy. We therefore recommend stakeholders in solid waste management to regard LCA as a tool, which, by its ability of

  4. Transportation and Program Management Services

    Office of Environmental Management (EM)

    Atlanta, Georgia Transportation and Program Management Services Secured Transportation Services, LLC Founded: December, 2003 ff Staff: 7 Experience: Over 145 years combined experience in Nuclear Transportation, Security, HP & Operations Services Transportation The largest Transportation Coordinators of Spent Nuclear Fuel in North America On-Site, Hands-On Assistance (Before & During both Loading & Transport) P d A i t (W iti d/ R i ) Procedure Assistance (Writing and/or Review)

  5. A Fuzzy-Logic Subsumption Controller for Home Energy Management Systems

    SciTech Connect (OSTI)

    Ainstworth, Nathan; Johnson, Brian; Lundstrom, Blake

    2015-10-05

    Presentation for NAPS 2015 associated with conference publication CP-64392. Home Energy Management Systems (HEMS) are controllers that manage and coordinate the generation, storage, and loads in a home. These controllers are increasingly necessary to ensure that increasing penetrations of distributed energy resources are used effectively and do not disrupt the operation of the grid. In this paper, we propose a novel approach to HEMS design based on behavioral control methods, which do not require accurate models or predictions and are very responsive to changing conditions.

  6. Improving energy efficiency via smart building energy management systems. A comparison with policy measures

    SciTech Connect (OSTI)

    Rocha, Paula; Siddiqui, Afzal; Stadler, Michael

    2014-12-09

    In this study, to foster the transition to more sustainable energy systems, policymakers have been approving measures to improve energy efficiency as well as promoting smart grids. In this setting, building managers are encouraged to adapt their energy operations to real-time market and weather conditions. Yet, most fail to do so as they rely on conventional building energy management systems (BEMS) that have static temperature set points for heating and cooling equipment. In this paper, we investigate how effective policy measures are at improving building-level energy efficiency compared to a smart BEMS with dynamic temperature set points. To this end, we present an integrated optimisation model mimicking the smart BEMS that combines decisions on heating and cooling systems operations with decisions on energy sourcing. Using data from an Austrian and a Spanish building, we find that the smart BEMS results in greater reduction in energy consumption than a conventional BEMS with policy measures.

  7. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

    2009-09-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

  8. Web-based energy information systems for energy management and demand response in commercial buildings

    SciTech Connect (OSTI)

    Motegi, Naoya; Piette, Mary Ann; Kinney, Satkartar; Herter, Karen

    2003-04-18

    Energy Information Systems (EIS) for buildings are becoming widespread in the U.S., with more companies offering EIS products every year. As a result, customers are often overwhelmed by the quickly expanding portfolio of EIS feature and application options, which have not been clearly identified for consumers. The object of this report is to provide a technical overview of currently available EIS products. In particular, this report focuses on web-based EIS products for large commercial buildings, which allow data access and control capabilities over the Internet. EIS products combine software, data acquisition hardware, and communication systems to collect, analyze and display building information to aid commercial building energy managers, facility managers, financial managers and electric utilities in reducing energy use and costs in buildings. Data types commonly processed by EIS include energy consumption data; building characteristics; building system data, such as heating, ventilation, and air-conditioning (HVAC) and lighting data; weather data; energy price signals; and energy demand-response event information. This project involved an extensive review of research and trade literature to understand the motivation for EIS technology development. This study also gathered information on currently commercialized EIS. This review is not an exhaustive analysis of all EIS products; rather, it is a technical framework and review of current products on the market. This report summarizes key features available in today's EIS, along with a categorization framework to understand the relationship between EIS, Energy Management and Control Systems (EMCSs), and similar technologies. Four EIS types are described: Basic Energy Information Systems (Basic-EIS); Demand Response Systems (DRS); Enterprise Energy Management (EEM); and Web-based Energy Management and Control Systems (Web-EMCS). Within the context of these four categories, the following characteristics of EIS are

  9. FORSITE, a multiple-project management system: overview and general description

    SciTech Connect (OSTI)

    Entingh, D.J.; Bernstein, A.J.; Gerstein, R.E.; Kenkeremath, L.D.; Gould, A.V.

    1982-10-01

    The Geothermal Site Development Forecasting System (FORSITE) is a computer-based multiproject monitoring, scheduling, and forecasting system. Its main purpose is to assist DOE geothermal program managers in monitoring the progress of multiple geothermal electric exploration and construction projects. The system actively combines conceptual project development schedules with site-specific status data to predict a time-phased sequence of development likely to occur at multiple specific geothermal sites. The forecasting capabilities of the model include estimation of industry costs and federal manpower requirements across sites on a year-by-year basis.

  10. Managing steam: An engineering guide to industrial, commercial, and utility systems

    SciTech Connect (OSTI)

    Makansi, J.

    1985-01-01

    This book is a guide to steam production, utilization, handling, transport, system optimization, and condensation and recovery. This book incudes a description of how steam, condensate, and hot water are used in various industrial, commercial, institutional, and utility sectors and explains how steam is generated and distributed. Waste-heat recovery, fluidized-bed boilers, and cogeneration systems and boiler control theory are discussed. The book also describes different types of valves, valve components, regulators, steam traps, and metering devices available for managing steam and condensate and discusses maintaining steam systems for optimum service and longer life.

  11. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  12. Secure Cryptographic Key Management System (CKMS) Considerations for Smart Grid Devices

    SciTech Connect (OSTI)

    Abercrombie, Robert K; Sheldon, Frederick T; Aldridge, Hal; Duren, Mike; Ricci, Tracy; Bertino, Elisa; Kulatunga, Athula; Navaratne, Uditha Sudheera

    2011-01-01

    In this paper, we examine some unique challenges associated with key management in the Smart Grid and concomitant research initiatives: 1) effectively model security requirements and their implementations, and 2) manage keys and key distribution for very large scale deployments such as Smart Meters over a long period of performance. This will set the stage to: 3) develop innovative, low cost methods to protect keying material, and 4) provide high assurance authentication services. We will present our perspective on key management and will discuss some key issues within the life cycle of a cryptographic key designed to achieve the following: 1) control systems designed, installed, operated, and maintained to survive an intentional cyber assault with no loss of critical function, and 2) widespread implementation of methods for secure communication between remote access devices and control centers that are scalable and cost-effective to deploy.

  13. Potential use of feebate systems to foster environmentally sound urban waste management

    SciTech Connect (OSTI)

    Puig-Ventosa, Ignasi

    2004-07-01

    Waste treatment facilities are often shared among different municipalities as a means of managing wastes more efficiently. Usually, management costs are assigned to each municipality depending on the size of the population or total amount of waste produced, regardless of important environmental aspects such as per capita waste generation or achievements in composting or recycling. This paper presents a feebate (fee+rebate) system aimed to foster urban waste reduction and recovery. The proposal suggests that municipalities achieving better results in their waste management performance (from an ecological viewpoint) be recompensated with a rebate obtained from a fee charged to those municipalities that are less environmentally sound. This is a dynamic and flexible instrument that would positively encourage municipalities to reduce waste whilst increasing the recycling.

  14. Quality Assurance Management System Guide for Use with 10 CFR 830.120 and DOE O 414.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-17

    DOE Elements and DOE contractors should consult this Guide in order to develop and implement effective management systems that are consistent with the Department's quality expectations and that support the Safety Management System Policy, DOE P 450.4. Canceled by DOE G 414.1-2A. Does not cancel other directives.

  15. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    SciTech Connect (OSTI)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.

  16. Next-generation building energy management systems and implications for electricity markets.

    SciTech Connect (OSTI)

    Zavala, V. M.; Thomas, C.; Zimmerman, M.; Ott, A.

    2011-08-11

    The U.S. national electric grid is facing significant changes due to aggressive federal and state targets to decrease emissions while improving grid efficiency and reliability. Additional challenges include supply/demand imbalances, transmission constraints, and aging infrastructure. A significant number of technologies are emerging under this environment including renewable generation, distributed storage, and energy management systems. In this paper, we claim that predictive energy management systems can play a significant role in achieving federal and state targets. These systems can merge sensor data and predictive statistical models, thereby allowing for a more proactive modulation of building energy usage as external weather and market signals change. A key observation is that these predictive capabilities, coupled with the fast responsiveness of air handling units and storage devices, can enable participation in several markets such as the day-ahead and real-time pricing markets, demand and reserves markets, and ancillary services markets. Participation in these markets has implications for both market prices and reliability and can help balance the integration of intermittent renewable resources. In addition, these emerging predictive energy management systems are inexpensive and easy to deploy, allowing for broad building participation in utility centric programs.

  17. Effect of Cracow program elimination of low emission sources upon the energy management system in Cracow

    SciTech Connect (OSTI)

    Friedberg, J.; Goerlich, K.; Glowacki, K.

    1995-12-31

    At the end of the 1980s, the energy management at the local level-like the whole set of such utility services-was based upon respective enterprises subject to a certain supervision of the establishing body and to a control of the District Inspectorate of Energy Management. Those enterprises that deal with generation and supply of heat energy to the local market, with distribution of heat, natural gas and electricity, operated as state companies; the last two branches made a part of either regional or national companies. Irrespective of the aforesaid, the co-generation power plants existed usually outside the heat generation and supply system. The business economics of these enterprises was not subject to any market rules whatsoever, the prices were controlled and the customers had no right of choice of the energy supplier. From the very beginning the low emission elimination program assumed to have commercial rules introduced in the energy management. Thus, it turned out necessary to prepare the market - to draw up inventory of the conditions and needs related with heat supply and to take up market solutions as well. The management system, and in particular the items specified below, is discussed. The co-operation of energy distribution enterprises has been based upon a voluntary agreement (The Team for Energy Suppliers) so as to agree upon the basic actions of the respective partners; joint actions have been taken up more and more willingly.

  18. Carbonate fuel cell system with integrated carbon dioxide/thermal management

    SciTech Connect (OSTI)

    Paetsch, L.; Ding, J.; Hunt, J.

    1995-12-31

    Upon successful completion of Phase 1, the Phase 2 activities were initiated in July 1994 to define the stack design and system requirements for a commercial-scale burnerless carbonate fuel cell stack with an integrated carbon dioxide management system. The major goals of this program are to define the stack design and the system requirements of the integrated design. The approach taken was to maximize the similarities of this stack with ERC`s proven baseline stack design and power plant system. Recent accomplishments include a detailed stack design which retains all the essential elements of the baseline stack as well as the power plant system designs. All the auxiliary hardware and external flow patterns remain unchanged, only the internal flow configurations are modified.

  19. The Mirror Fusion Test Facility cryogenic system: Performance, management approach, and present equipment status

    SciTech Connect (OSTI)

    Slack, D.S.; Chronis, W.C.

    1987-06-08

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) is a 14-kW, 4.35-K helium refrigeration system that proved to be highly successful and cost-effective. All operating objectives were met, while remaining within a few percent of initial cost and schedule plans. The management approach used in MFTF allowed decisions to be made quickly and effectively, and it helped keep costs down. Manpower levels, extent and type of industrial participation, key aspects of subcontractor specifications, and subcontractor interactions are reviewed, as well as highlights of the system tests, operation, and present equipment status. Organizations planning large, high-technology systems may benefit from this experience with the MFTF cryogenic system.

  20. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  1. Final Report: Development of a Thermal and Water Management System for PEM Fuel Cell

    SciTech Connect (OSTI)

    Zia Mirza, Program Manager

    2011-12-06

    This final program report is prepared to provide the status of program activities performed over the period of 9 years to develop a thermal and water management (TWM) system for an 80-kW PEM fuel cell power system. The technical information and data collected during this period are presented in chronological order by each calendar year. Balance of plant (BOP) components of a PEM fuel cell automotive system represents a significant portion of total cost based on the 2008 study by TIAX LLC, Cambridge, MA. The objectives of this TWM program were two-fold. The first objective was to develop an advanced cooling system (efficient radiator) to meet the fuel cell cooling requirements. The heat generated by the fuel cell stack is a low-quality heat (small difference between fuel cell stack operating temperature and ambient air temperature) that needs to be dissipated to the ambient air. To minimize size, weight, and cost of the radiator, advanced fin configurations were evaluated. The second objective was to evaluate air humidification systems which can meet the fuel cell stack inlet air humidity requirements. The moisture from the fuel cell outlet air is transferred to inlet air, thus eliminating the need for an outside water source. Two types of humidification devices were down-selected: one based on membrane and the other based on rotating enthalpy wheel. The sub-scale units for both of these devices have been successfully tested by the suppliers. This project addresses System Thermal and Water Management.

  2. Aligning National Environmental Policy Act Process with Environmental Management Systems (CEQ, 2007)

    Broader source: Energy.gov [DOE]

    Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans."

  3. Management of the Polychlorinated Biphenyl Inventory in the Double Shell Tank (DST) System

    SciTech Connect (OSTI)

    MULKEY, C.H.

    2001-01-26

    This document describes the principal methods of managing Polychlorinated Biphenyls (PCBs) in the Double Shell Tank (DST) system. This document also describes waste acceptance criteria to be used in evaluating the acceptability of waste containing PCBs. The main purpose behind the transfer controls and PCB waste acceptance criteria is to ensure that the waste can be adequately treated in the Waste Treatment (vitrification) Plant. These criteria are expected to change as additional information on the treatment plant's capability becomes available.

  4. A Data Management System for Ab-initio Nuclear Physics Applications |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Leadership Computing Facility A Data Management System for Ab-initio Nuclear Physics Applications Authors: Liu, F., Mundhe, R., Sosonkina, M., Cockrell, C., Aronnax, M., Maris, P., Vary, J.P. Reproducible Research lies at the very core of the scientific method: an experiment is reproducible if it can be replicated by researchers independent from those that conducted it in the first place. Provenance is an emerging concept in computational sciences. In this work, provenance is

  5. Earned Value Management System Interpretation Handbook (EVMSIH) V2.0 |

    Energy Savers [EERE]

    Department of Energy Interpretation Handbook (EVMSIH) V2.0 Earned Value Management System Interpretation Handbook (EVMSIH) V2.0 As the office with the responsibility to develop establish, maintain and execute the EVMS compliance mission, PM endeavors to work closely with the Program Offices and the Energy Facility Contractors Group (EFCOG) in the pursuit of consistent and compliant implementation. A uniform approach to interpretation of the EIA-748 EVMS Guidelines is a major element in DOE's

  6. Superior Energy Performance: Getting the Most Value from ISO 50001-Energy Management Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance cm : Getting the Most Value from ISO 50001- Energy Management Systems US Department of Energy Advanced Manufacturing Office March 13, 2012 Aimee McKane Lawrence Berkeley National Laboratory 2 | Industrial Energy Efficiency eere.energy.gov * Time and again, industrial energy efficiency has been demonstrated to be cost effective while having a positive effect on productivity * Despite this, energy efficiency improvements with very favorable payback periods often do not

  7. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  8. Building America Top Innovations 2013 Profile … Quality Management System Guidelines

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management System tools customized for residential construction are ready for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework. Unlike many manufacturing industries, home construction is usually accomplished through the cooperation of several businesses, including the designer; the architect; the builder; site supervisors; HVAC, plumbing, electrical, framing, roofing, insulation and other contractors; manufacturers and suppliers of materials

  9. Building America Top Innovations 2013 Profile … Quality Management System Guidelines

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    management system tools customized for residential construction are ready for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework. Unlike many manufacturing industries, home construction is usually accomplished through the cooperation of several businesses, including the designer; the architect; the builder; site supervisors; HVAC, plumbing, electrical, framing, roofing, insulation and other contractors; manufacturers and suppliers of materials

  10. System requirements and design description for the environmental requirements management interface (ERMI)

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1997-09-30

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC.

  11. The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    2000-02-09

    The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self

  12. Systems and methods for controlling energy use in a building management system using energy budgets

    DOE Patents [OSTI]

    Wenzel, Michael J.

    2012-06-17

    Systems and methods for limiting power consumption by a heating, ventilation, and air conditioning (HVAC) subsystem of a building are shown and described. A mathematical linear operator is found that transforms the unused or deferred cooling power usage of the HVAC system based on pre-determined temperature settings to a target cooling power usage. The mathematical operator is applied to the temperature settings to create a temperature setpoint trajectory expected to provide the target cooling power usage.

  13. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  14. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  15. Karlsruhe Database for Radioactive Wastes (KADABRA) - Accounting and Management System for Radioactive Waste Treatment - 12275

    SciTech Connect (OSTI)

    Himmerkus, Felix; Rittmeyer, Cornelia [WAK Rueckbau- und Entsorgungs- GmbH, 76339 Eggenstein-Leopoldshafen (Germany)

    2012-07-01

    The data management system KADABRA was designed according to the purposes of the Cen-tral Decontamination Department (HDB) of the Wiederaufarbeitungsanlage Karlsruhe Rueckbau- und Entsorgungs-GmbH (WAK GmbH), which is specialized in the treatment and conditioning of radioactive waste. The layout considers the major treatment processes of the HDB as well as regulatory and legal requirements. KADABRA is designed as an SAG ADABAS application on IBM system Z mainframe. The main function of the system is the data management of all processes related to treatment, transfer and storage of radioactive material within HDB. KADABRA records the relevant data concerning radioactive residues, interim products and waste products as well as the production parameters relevant for final disposal. Analytical data from the laboratory and non destructive assay systems, that describe the chemical and radiological properties of residues, production batches, interim products as well as final waste products, can be linked to the respective dataset for documentation and declaration. The system enables the operator to trace the radioactive material through processing and storage. Information on the actual sta-tus of the material as well as radiological data and storage position can be gained immediately on request. A variety of programs accessed to the database allow the generation of individual reports on periodic or special request. KADABRA offers a high security standard and is constantly adapted to the recent requirements of the organization. (authors)

  16. Integrated municipal solid waste management: Six case studies of system cost and energy use. A summary report

    SciTech Connect (OSTI)

    1995-11-01

    Report documents an evaluation of the environmental, economic, and energy impacts of integrated municipal solid waste management systems in six cities: Minneapolis, NW; Springfield, MA; Seattle, WA; Scottsdale, AZ; Palm Beach County, CA; and Sevierville, TN. The primary objective of these case studies was to develop and present consistent cost, resource use (especially energy), and environmental regulator information on each operating IMSWM system. The process is defined as using two or more alternative waste management techniques. Detailed reports on each system are available.

  17. Bottom-up, decision support system development : a wetlandsalinity management application in California's San Joaquin Valley

    SciTech Connect (OSTI)

    Quinn, Nigel W.T.

    2006-05-10

    Seasonally managed wetlands in the Grasslands Basin ofCalifornia's San Joaquin Valley provide food and shelter for migratorywildfowl during winter months and sport for waterfowl hunters during theannual duck season. Surface water supply to these wetland contain saltwhich, when drained to the San Joaquin River during the annual drawdownperiod, negatively impacts downstream agricultural riparian waterdiverters. Recent environmental regulation, limiting discharges salinityto the San Joaquin River and primarily targeting agricultural non-pointsources, now addresses return flows from seasonally managed wetlands.Real-time water quality management has been advocated as a means ofmatching wetland return flows to the assimilative capacity of the SanJoaquin River. Past attempts to build environmental monitoring anddecision support systems to implement this concept have failed forreasons that are discussed in this paper. These reasons are discussed inthe context of more general challenges facing the successfulimplementation of environmental monitoring, modelling and decisionsupport systems. The paper then provides details of a current researchand development project which will ultimately provide wetland managerswith the means of matching salt exports with the available assimilativecapacity of the San Joaquin River, when fully implemented. Manipulationof the traditional wetland drawdown comes at a potential cost to thesustainability of optimal wetland moist soil plant habitat in thesewetlands - hence the project provides appropriate data and a feedback andresponse mechanism for wetland managers to balance improvements to SanJoaquin River quality with internally-generated information on the healthof the wetland resource. The author concludes the paper by arguing thatthe architecture of the current project decision support system, whencoupled with recent advances in environmental data acquisition, dataprocessing and information dissemination technology, holds significantpromise

  18. Understanding Carbon Sequestration Options in the United States: Capabilities of a Carbon Management Geographic Information System

    SciTech Connect (OSTI)

    Dahowski, Robert T.; Dooley, James J.; Brown, Daryl R.; Mizoguchi, Akiyoshi; Shiozaki, Mai

    2001-04-03

    While one can discuss various sequestration options at a national or global level, the actual carbon management approach is highly site specific. In response to the need for a better understanding of carbon management options, Battelle in collaboration with Mitsubishi Corporation, has developed a state-of-the-art Geographic Information System (GIS) focused on carbon capture and sequestration opportunities in the United States. The GIS system contains information (e.g., fuel type, location, vintage, ownership, rated capacity) on all fossil-fired generation capacity in the Untied States with a rated capacity of at least 100 MW. There are also data on other CO2 sources (i.e., natural domes, gas processing plants, etc.) and associated pipelines currently serving enhanced oil recovery (EOR) projects. Data on current and prospective CO2 EOR projects include location, operator, reservoir and oil characteristics, production, and CO2 source. The system also contains information on priority deep saline aquifers and coal bed methane basins with potential for sequestering CO2. The GIS application not only enables data storage, flexible map making, and visualization capabilities, but also facilitates the spatial analyses required to solve complex linking of CO2 sources with appropriate and cost-effective sinks. A variety of screening criteria (spatial, geophysical, and economic) can be employed to identify sources and sinks most likely amenable to deployment of carbon capture and sequestration systems. The system is easily updateable, allowing it to stay on the leading edge of capture and sequestration technology as well as the ever-changing business landscape. Our paper and presentation will describe the development of this GIS and demonstrate its uses for carbon management analysis.

  19. Bibliography for nuclear criticality accident experience, alarm systems, and emergency management

    SciTech Connect (OSTI)

    Putman, V.L.

    1995-09-01

    The characteristics, detection, and emergency management of nuclear criticality accidents outside reactors has been an important component of criticality safety for as long as the need for this specialized safety discipline has been recognized. The general interest and importance of such topics receives special emphasis because of the potentially lethal, albeit highly localized, effects of criticality accidents and because of heightened public and regulatory concerns for any undesirable event in nuclear and radiological fields. This bibliography lists references which are potentially applicable to or interesting for criticality alarm, detection, and warning systems; criticality accident emergency management; and their associated programs. The lists are annotated to assist bibliography users in identifying applicable: industry and regulatory guidance and requirements, with historical development information and comments; criticality accident characteristics, consequences, experiences, and responses; hazard-, risk-, or safety-analysis criteria; CAS design and qualification criteria; CAS calibration, maintenance, repair, and testing criteria; experiences of CAS designers and maintainers; criticality accident emergency management (planning, preparedness, response, and recovery) requirements and guidance; criticality accident emergency management experience, plans, and techniques; methods and tools for analysis; and additional bibliographies.

  20. Systems and methods for controlling energy use in a building management system using energy budgets

    DOE Patents [OSTI]

    Wenzel, Michael J; Drees, Kirk H

    2014-09-23

    Systems and methods for limiting power consumption by a heating, ventilation, and air conditioning (HVAC) subsystem of a building are shown and described. A feedback controller is used to generate a manipulated variable based on an energy use setpoint and a measured energy use. The manipulated variable may be used for adjusting the operation of an HVAC device.

  1. U-140: HP-UX Unspecified Flaw in DCE Lets Remote Users Execute Arbitrary Code

    Broader source: Energy.gov [DOE]

    A remote user can execute arbitrary code on the target system. A remote user can send specially crafted data to execute arbitrary code on the target system. The code will run with the privileges of the target service.

  2. LCA-IWM: A decision support tool for sustainability assessment of waste management systems

    SciTech Connect (OSTI)

    Boer, J. den Boer, E. den; Jager, J.

    2007-07-01

    The paper outlines the most significant result of the project 'The use of life cycle assessment tools for the development of integrated waste management strategies for cities and regions with rapid growing economies', which was the development of two decision-support tools: a municipal waste prognostic tool and a waste management system assessment tool. The article focuses on the assessment tool, which supports the adequate decision making in the planning of urban waste management systems by allowing the creation and comparison of different scenarios, considering three basic subsystems: (i) temporary storage; (ii) collection and transport and (iii) treatment, disposal and recycling. The design and analysis options, as well as the assumptions made for each subsystem, are shortly introduced, providing an overview of the applied methodologies and technologies. The sustainability assessment methodology used in the project to support the selection of the most adequate scenario is presented with a brief explanation of the procedures, criteria and indicators applied on the evaluation of each of the three sustainability pillars.

  3. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  4. The Integrated Cloud-based Environmental Data Management System at Los Alamos National Laboratory - 13391

    SciTech Connect (OSTI)

    Schultz Paige, Karen; Gomez, Penny; Patel, Nita P.; EchoHawk, Chris; Dorries, Alison M.

    2013-07-01

    In today's world, instant access to information is taken for granted. The national labs are no exception; our data users expect immediate access to their data. Los Alamos National Laboratory (LANL) has collected over ten million records, and the data needs to be accessible to scientists as well as the public. The data span a wide range of media, analytes, time periods, formats, and quality and have traditionally existed in scattered databases, making comprehensive work with the data impossible. Recently, LANL has successfully integrated all their environmental data into a single, cloud-based, web-accessible data management system. The system combines data transparency to the public with immediate access required by the technical staff. The use of automatic electronic data validation has been critical to immediate data access while saving millions of dollars and increasing data consistency and quality. The system includes a Google Maps based GIS tool that is simple enough for people to locate potentially contaminated sites near their home or workplace, and complex enough to allow scientists to plot and trend their data at the surface and at depth as well as over time. A variety of formatted reports can be run at any desired frequency to report the most current data available in the data base. The advanced user can also run free form queries of the data base. This data management system has saved LANL time and money, an increasingly important accomplishment during periods of budget cuts with increasing demand for immediate electronic services. (authors)

  5. Hanford Site Tank Waste Remediation System. Waste management 1993 symposium papers and viewgraphs

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The US Department of Energy`s (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives.

  6. Microsoft Word - Final Nuclear Materials Management and Safeguards System Users Guide 2 4-3-13.docx

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management and Safeguards Users Guide National Nuclear Security Administration Office of Nuclear Materials Integration Office of Nuclear Materials Integration Nuclear Materials Management and Safeguards System (NMMSS) Users Guide-Rev. 2.0 Prepared by: Department of Energy National Nuclear Security Administration Nuclear Materials Integration - NA-73 April 2013 Xavier Ascanio Office of Nuclear Materials Integration Nuclear Materials Management and 73 NMMSS User Guide 2.0 April

  7. The Hall D solenoid helium refrigeration system at JLab

    SciTech Connect (OSTI)

    Laverdure, Nathaniel A.; Creel, Jonathan D.; Dixon, Kelly d.; Ganni, Venkatarao; Martin, Floyd D.; Norton, Robert O.; Radovic, Sasa

    2014-01-01

    Hall D, the new Jefferson Lab experimental facility built for the 12GeV upgrade, features a LASS 1.85 m bore solenoid magnet supported by a 4.5 K helium refrigerator system. This system consists of a CTI 2800 4.5 K refrigerator cold box, three 150 hp screw compressors, helium gas management and storage, and liquid helium and nitrogen storage for stand-alone operation. The magnet interfaces with the cryo refrigeration system through an LN2-shielded distribution box and transfer line system, both designed and fabricated by JLab. The distribution box uses a thermo siphon design to respectively cool four magnet coils and shields with liquid helium and nitrogen. We describe the salient design features of the cryo system and discuss our recent commissioning experience.

  8. Solid waste information and tracking system client-server conversion project management plan

    SciTech Connect (OSTI)

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  9. Environmental Management System (EMS) objectives&targets annual results summary : FY2012.

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2013-02-01

    Sandia National Laboratories/New Mexico's (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NM's operations on the environment. An annual summary of the results achieved towards meeting established objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2012.

  10. Assessment of national systems for obtaining local acceptance of waste management siting and routing activities

    SciTech Connect (OSTI)

    Paige, H.W.; Lipman, D.S.; Owens, J.E.

    1980-07-01

    There is a rich mixture of formal and informal approaches being used in our sister nuclear democracies in their attempts to deal with the difficulties of obtaining local acceptance for siting of waste management facilities and activities. Some of these are meeting with a degree of success not yet achieved in the US. Although this survey documents and assesses many of these approaches, time did not permit addressing in any detail their relevance to common problems in the US. It would appear the US could benefit from a periodic review of the successes and failures of these efforts, including analysis of their applicability to the US system. Of those countries (Germany, Sweden, Switzerland, Japan, Belgium, and the US) who are working to a time table for the preparation of a high-level waste (HLW) repository, Germany is the only country to have gained local siting acceptance for theirs. With this (the most difficult of siting problems) behind them they appear to be in the best overall condition relative to waste management progress and plans. This has been achieved without a particularly favorable political structure, made up for by determination on the part of the political leadership. Of the remaining three countries studied (France, UK and Canada) France, with its AVM production facility, is clearly the world leader in the HLW immobilization aspect of waste management. France, Belgium and the UK appear to have the least favorable political structures and environments for arriving at waste management decisions. US, Switzerland and Canada appear to have the least favorable political structures and environments for arriving at waste management decisions.

  11. Laboratory Information Management Systems for Forensic Laboratories: A White Paper for Directors and Decision Makers

    SciTech Connect (OSTI)

    Anthony Hendrickson; Brian Mennecke; Kevin Scheibe; Anthony Townsend; ,

    2005-10-01

    Modern, forensics laboratories need Laboratory Information Management Systems (LIMS) implementations that allow the lab to track evidentiary items through their examination lifecycle and also serve all pertinent laboratory personnel. The research presented here presents LIMS core requirements as viewed by respondents serving in different forensic laboratory capacities as well as different forensic laboratory environments. A product-development methodology was employed to evaluate the relative value of the key features that constitute a LIMS, in order to develop a set of relative values for these features and the specifics of their implementation. In addition to the results of the product development analysis, this paper also provides an extensive review of LIMS and provides an overview of the preparation and planning process for the successful upgrade or implementation of a LIMS. Analysis of the data indicate that the relative value of LIMS components are viewed differently depending upon respondents' job roles (i.e., evidence technicians, scientists, and lab management), as well as by laboratory size. Specifically, the data show that: (1) Evidence technicians place the most value on chain of evidence capabilities and on chain of custody tracking; (2) Scientists generally place greatest value on report writing and generation, and on tracking daughter evidence that develops during their analyses; (3) Lab. Managers place the greatest value on chain of custody, daughter evidence, and not surprisingly, management reporting capabilities; and (4) Lab size affects LIMS preference in that, while all labs place daughter evidence tracking, chain of custody, and management and analyst report generation as their top three priorities, the order of this prioritization is size dependent.

  12. Enterprise Assessments Lessons Learned from Targeted Reviews of the Management of Safety Systems at U.S. Department of Energy Nuclear Facilities – April 2016

    Broader source: Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of the Management of Safety Systems at U.S. Department of Energy Nuclear Facilities

  13. Improving energy efficiency via smart building energy management systems. A comparison with policy measures

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Rocha, Paula; Siddiqui, Afzal; Stadler, Michael

    2014-12-09

    In this study, to foster the transition to more sustainable energy systems, policymakers have been approving measures to improve energy efficiency as well as promoting smart grids. In this setting, building managers are encouraged to adapt their energy operations to real-time market and weather conditions. Yet, most fail to do so as they rely on conventional building energy management systems (BEMS) that have static temperature set points for heating and cooling equipment. In this paper, we investigate how effective policy measures are at improving building-level energy efficiency compared to a smart BEMS with dynamic temperature set points. To this end,more » we present an integrated optimisation model mimicking the smart BEMS that combines decisions on heating and cooling systems operations with decisions on energy sourcing. Using data from an Austrian and a Spanish building, we find that the smart BEMS results in greater reduction in energy consumption than a conventional BEMS with policy measures.« less

  14. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

  15. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)

    SciTech Connect (OSTI)

    N /A

    2001-05-01

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  16. Method and system for managing an electrical output of a turbogenerator

    DOE Patents [OSTI]

    Stahlhut, Ronnie Dean; Vuk, Carl Thomas

    2010-08-24

    The system and method manages an electrical output of a turbogenerator in accordance with multiple modes. In a first mode, a direct current (DC) bus receives power from a turbogenerator output via a rectifier where turbogenerator revolutions per unit time (e.g., revolutions per minute (RPM)) or an electrical output level of a turbogenerator output meet or exceed a minimum threshold. In a second mode, if the turbogenerator revolutions per unit time or electrical output level of a turbogenerator output are less than the minimum threshold, the electric drive motor or a generator mechanically powered by the engine provides electrical energy to the direct current bus.

  17. Method and system for managing an electrical output of a turbogenerator

    DOE Patents [OSTI]

    Stahlhut, Ronnie Dean; Vuk, Carl Thomas

    2009-06-02

    The system and method manages an electrical output of a turbogenerator in accordance with multiple modes. In a first mode, a direct current (DC) bus receives power from a turbogenerator output via a rectifier where turbogenerator revolutions per unit time (e.g., revolutions per minute (RPM)) or an electrical output level of a turbogenerator output meet or exceed a minimum threshold. In a second mode, if the turbogenerator revolutions per unit time or electrical output level of a turbogenerator output are less than the minimum threshold, the electric drive motor or a generator mechanically powered by the engine provides electrical energy to the direct current bus.

  18. An Integrated Waste-Management System and Consent-Based Approach to Siting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    An Integrated Waste-Management System and Consent-Based Approach to Siting Consent-Based Siting Initiative Kick-Off Meeting Renaissance Washington, D.C. Downtown Hotel January 20, 2016 FULL TRANSCRIPT Mr. Jim Hamilton. So good afternoon, welcome and thank you for being here. And for those joining us from earlier time zones on the webinar and conference call, good morning. My name is Jim Hamilton. I am part of the North Wind Consent-Based Siting Team advising the Department and I will be

  19. Ekwi&ment Systems Divison Mr. James W. Wagoner II FDSRAP Program Manager

    Office of Legacy Management (LM)

    JQ?& Oak R,idge kssociated c5cYJ " POST Ofim Bar 1 i 7 Unwersltles Oaks Rdye. Twmessee 37E31-0: 17 February 12, 1990 Ek!rcy 1 Ekwi&ment Systems Divison Mr. James W. Wagoner II FDSRAP Program Manager Decontamination and Decommissioning Division Office of Environmental Restoration and Waste fianagement U.S. Department of Energy Washington, D.C. 20545 Subject: VISIT TO POTENTIAL SITES IN NEWARK AND LINDEN, NEW JERSEY Dear Mr. Wagoner: On February 6, 1990, while in Atlantic City to

  20. W-026, Waste Receiving and Processing Facility data management system validation and verification report

    SciTech Connect (OSTI)

    Palmer, M.E.

    1997-12-05

    This V and V Report includes analysis of two revisions of the DMS [data management system] System Requirements Specification (SRS) and the Preliminary System Design Document (PSDD); the source code for the DMS Communication Module (DMSCOM) messages; the source code for selected DMS Screens, and the code for the BWAS Simulator. BDM Federal analysts used a series of matrices to: compare the requirements in the System Requirements Specification (SRS) to the specifications found in the System Design Document (SDD), to ensure the design supports the business functions, compare the discreet parts of the SDD with each other, to ensure that the design is consistent and cohesive, compare the source code of the DMS Communication Module with the specifications, to ensure that the resultant messages will support the design, compare the source code of selected screens to the specifications to ensure that resultant system screens will support the design, compare the source code of the BWAS simulator with the requirements to interface with DMS messages and data transfers relating to the BWAS operations.