Powered by Deep Web Technologies
Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Customer Strategies for Responding to Day-Ahead Market HourlyElectricity Pricing  

SciTech Connect

Real-time pricing (RTP) has been advocated as an economically efficient means to send price signals to customers to promote demand response (DR) (Borenstein 2002, Borenstein 2005, Ruff 2002). However, limited information exists that can be used to judge how effectively RTP actually induces DR, particularly in the context of restructured electricity markets. This report describes the second phase of a study of how large, non-residential customers' adapted to default-service day-ahead hourly pricing. The customers are located in upstate New York and served under Niagara Mohawk, A National Grid Company (NMPC)'s SC-3A rate class. The SC-3A tariff is a type of RTP that provides firm, day-ahead notice of hourly varying prices indexed to New York Independent System Operator (NYISO) day-ahead market prices. The study was funded by the California Energy Commission (CEC)'s PIER program through the Demand Response Research Center (DRRC). NMPC's is the first and longest-running default-service RTP tariff implemented in the context of retail competition. The mix of NMPC's large customers exposed to day-ahead hourly prices is roughly 30% industrial, 25% commercial and 45% institutional. They have faced periods of high prices during the study period (2000-2004), thereby providing an opportunity to assess their response to volatile hourly prices. The nature of the SC-3A default service attracted competitive retailers offering a wide array of pricing and hedging options, and customers could also participate in demand response programs implemented by NYISO. The first phase of this study examined SC-3A customers' satisfaction, hedging choices and price response through in-depth customer market research and a Constant Elasticity of Substitution (CES) demand model (Goldman et al. 2004). This second phase was undertaken to answer questions that remained unresolved and to quantify price response to a higher level of granularity. We accomplished these objectives with a second customer survey and interview effort, which resulted in a higher, 76% response rate, and the adoption of the more flexible Generalized Leontief (GL) demand model, which allows us to analyze customer response under a range of conditions (e.g. at different nominal prices) and to determine the distribution of individual customers' response.

Goldman, Chuck; Hopper, Nicole; Bharvirkar, Ranjit; Neenan,Bernie; Boisvert, Dick; Cappers, Peter; Pratt, Donna; Butkins, Kim

2005-08-25T23:59:59.000Z

2

Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.  

SciTech Connect

The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

Columbia River System Operation Review (U.S.)

1994-02-01T23:59:59.000Z

3

LIBRARY SERVICES LIBRARY HOURS  

E-Print Network (OSTI)

LIBRARY SERVICES LIBRARY HOURS Up-to-date library hours are posted at http Wesleyan ID that is linked to the library circulation database is needed to charge out library materials to visit the Circulation Office in Olin Library 115 to set up their borrowing privileges. If you have

Royer, Dana

4

RESPONDENT INFORMATION  

Annual Energy Outlook 2012 (EIA)

- - 2013 Use Area of Origin Codes on page 6 Submit completed form by April 18, 2014 via: EIA ID NUMBER: 2.0 Submission Status: Original Amended This report is mandatory under...

5

Natural Gas Annual Respondent Query System  

Gasoline and Diesel Fuel Update (EIA)

loading new table loading new table Home > Natural Gas > Natural Gas Annual Respondent Query System Natural Gas Annual Respondent Query System (EIA-176 Data through 2012) Report: 176 Natural Gas Deliveries 176 Natural Gas Supply Items 176 Natural Gas Other Disposition Items 176 Type of Operations and Sector Items 176 Continuation Text Lines 176 Company List 191 Field Level Storage Data 757 Processing Capacity 176 Custom Report (User-defined) Years: 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 to 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Sort by: Area, Company, Item Company, Area, Item Item, Area, Company Company: Show only Company ID Show only Company Name Show both Company ID, Name 2012 Total

6

Almo Corporation, Respondent  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Almo Corporation, Almo Corporation, Respondent Issued: July 25, 2012 BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 20 12-CE-1416 By the General Counsel, U.S. Depatiment of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department ofEnergy ("DOE") and Almo Corporation ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requjrements located at ,10 C.F.R. § 429.12. 2. The DOE and Respondent have negotiated the tmms of the Compmmise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

7

Assessing respondent-driven sampling  

Science Journals Connector (OSTI)

...convenience sampling through the internet versus respondent driven sampling...in Social Networks, Drug Abuse, and HIV Transmission , eds...5) MSM Tallinn, Estonia Internet convenience sampling...convenience sampling through the internet versus respondent driven sampling...

Sharad Goel; Matthew J. Salganik

2010-01-01T23:59:59.000Z

8

Common Help Room Hours  

E-Print Network (OSTI)

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16200 - MATH 205 - Nathanael Cox...

9

Common Help Room Hours  

E-Print Network (OSTI)

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16010 - MATH 205 - Alessandra...

10

Contacts / Hours - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

11

hourly | OpenEI  

Open Energy Info (EERE)

hourly hourly Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (7 months ago) Date Updated July 02nd, 2013 (5 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

12

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

www.inl.gov Prepared for the U.S. Department of Energy Office of Nuclear Energy Under DOE Idaho Operations Office Contract DE-AC07-05ID14517 ii EXECUTIVE SUMMARY The U.S....

13

Data ID Service  

NLE Websites -- All DOE Office Websites (Extended Search)

ID Service First DOI for a DOE dataset was minted by OSTI and registered with DataCite on 8102011 from the DOE Atmospheric Radiation Measurement (ARM) Climate Research Facility...

14

NERSC Edison Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Hours Used Edison Hours Used 2014 Edison Usage Chart Edison Usage Chart 2013 Edison Usage Chart Edison Usage Chart 2014 Date Hours Used (in millions) Percent of Maximum Possible...

15

Business Owners: Respond to an Energy Emergency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Respond to an Energy Emergency Respond to an Energy Emergency Business Owners: Respond to an Energy Emergency Business Owners: Respond to an Energy Emergency Ensure your building is safe to occupy-Initially allow only essential, critical-operations staff into restricted areas. Ask your local or State health department for guidance on determining the safety of your building. Decide whether to activate backup power-If your backup generator doesn't automatically turn on during a power outage, you'll have to determine when to activate backup systems. First determine whether power is likely to be restored within 24 hours. If not, you may want to activate those systems to protect your business assets. Learn more Contact your fuel supplier-If you rely on fuel supplies for your business, vehicles, generators, and other equipment, contact your fuel

16

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network (OSTI)

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $765.00 15 2 $22,950.00 ISS, Engineering, Journalism & Mass Communications, Music and Social Welfare fees. These amounts do NOT include to complete at least 12 hours each fall and spring semester. Calculations are based on 15 hours (an average

17

LANL responds to radiological incident  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL responds to radiological incident LANL responds to radiological incident LANL responds to radiological incident Multiple tests indicate no health risks to public or employees. August 27, 2012 Aerial view of the Los Alamos Neutron Science Center(LANSCE). Aerial view of the Los Alamos Neutron Science Center (LANSCE). The contamination poses no danger to the public. The Laboratory is investigating the inadvertent spread of Technetium 99 by employees and contractors at the Lujan Neutron Scattering Center August 27, 2012-The Laboratory is investigating the inadvertent spread of Technetium 99 by employees and contractors at the Lujan Neutron Scattering Center at the Los Alamos Neutron Science Center (LANSCE), a multidisciplinary accelerator facility used for both civilian and national security research. The Laboratory has determined that about a dozen people

18

first responders | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Blog Home first responders first responders Nuclear Forensics The National Technical Nuclear Forensics (NTNF) program is a Homeland Security Council and National Security...

19

Responding to Emergencies | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

or radioactive device. Learn More First Responders Consequence Management Render Safe Operations Nuclear Forensics Related Topics narac arg ams frmac rap nest responding to...

20

NERSC Hopper Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Hours Used Hopper Hours Used 2014 Hopper Usage Chart Hopper Usage Chart 2013 Hopper Usage Chart Hopper Usage Chart 2012 Hopper Usage Chart Hopper Usage Chart 2011 Hopper Usage...

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Customer Strategies for Responding to Day-Ahead Market Hourly Electricity Pricing  

E-Print Network (OSTI)

Thus, input demands and price response elasticities can beelasticity is a very specific characterization of electricity demand and price responseprice elasticity, which measures the reduction in demand in response

2005-01-01T23:59:59.000Z

22

Customer Strategies for Responding to Day-Ahead Market Hourly Electricity Pricing  

E-Print Network (OSTI)

Operator (NYISO) and New York State Energy Research andOperator (NYISO) and New York State Energy Research andreport to the New York State Energy Research and Development

2005-01-01T23:59:59.000Z

23

First Responders | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Responders | National Nuclear Security Administration Responders | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration First Responders Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > First Responders First Responders NNSA's first responders include the Radiological Assistance Program (RAP)

24

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail an...

25

STUDENT ID Page 2 m  

E-Print Network (OSTI)

Write your name, student ID number, recitation instructor's name and recitation time in the space provided above. Also write your name at the top of pages 2, 3,...

26

Biodetection Technologies for First Responders  

SciTech Connect

In a white powder scenario, there are a large number of field-deployable assays that can be used to determine if the suspicious substance contains biological material and warrants further investigation. This report summarizes commercially available technologies that are considered hand portable and can be used by first responders in the field. This is not meant to be an exhaustive list, nor do the authors endorse any of the technologies described herein. Rather, it is meant to provide useful information about available technologies to help end-users make informed decisions about biodetection technology procurement and use.

Baird, Cheryl L.; Seiner, Derrick R.; Ozanich, Richard M.; Bartholomew, Rachel A.; Colburn, Heather A.; Straub, Tim M.; Bruckner-Lea, Cindy J.

2012-10-24T23:59:59.000Z

27

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network (OSTI)

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $828.00 15 2 $24,840.00 ISS Living Expenses Please see reverse side for Architecture, Arts, Business, Design & Planning, Engineering to change. Tuition will be guaranteed through spring 2018; however, expect approximately a 5% increase each

28

NERSC Franklin Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Franklin Hours Used Franklin Hours Used Franklin Hours Used 2011 Franklin Usage in Hours 2011 Franklin Usage in Hours 2010 2010 Franklin Usage in Hours 2009 2009 Franklin Usage in Hours 2007-2008 2008 Franklin Usage in Hours 2008 Franklin Usage in Hours Date Hours Used (in thousands) Percentage of Maximum Possible (24 hours/day) 04/28/2012 0.00 0.00 04/27/2012 272.62 29.40 04/26/2012 692.81 74.71 04/25/2012 841.60 90.75 04/24/2012 53.86 5.81 04/23/2012 432.01 46.59 04/22/2012 823.23 88.77 04/21/2012 473.95 51.11 04/20/2012 173.75 18.74 04/19/2012 449.22 48.44 04/18/2012 816.23 88.02 04/17/2012 754.35 81.34 04/16/2012 648.89 69.97 04/15/2012 812.25 87.59 04/14/2012 843.46 90.95 04/13/2012 737.46 79.52 04/12/2012 711.97 76.77 04/11/2012 734.65 79.22 04/10/2012 815.65 87.95 04/09/2012 897.25 96.75

29

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

30

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL/EXT-08-13979 INL/EXT-08-13979 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB National SCADA Test Bed Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 November 2008 INL/EXT-08-13979 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 Idaho National Laboratory Idaho Falls, Idaho 83415 http://www.inl.gov Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under DOE Idaho Operations Office Contract DE-AC07-05ID14517 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB

31

Category:Boise, ID | Open Energy Information  

Open Energy Info (EERE)

ID ID Jump to: navigation, search Go Back to PV Economics By Location Media in category "Boise, ID" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Boise ID Idaho Power Co.png SVFullServiceRestauran... 61 KB SVHospital Boise ID Idaho Power Co.png SVHospital Boise ID Id... 62 KB SVLargeHotel Boise ID Idaho Power Co.png SVLargeHotel Boise ID ... 66 KB SVLargeOffice Boise ID Idaho Power Co.png SVLargeOffice Boise ID... 58 KB SVMediumOffice Boise ID Idaho Power Co.png SVMediumOffice Boise I... 63 KB SVMidriseApartment Boise ID Idaho Power Co.png SVMidriseApartment Boi... 61 KB SVOutPatient Boise ID Idaho Power Co.png SVOutPatient Boise ID ... 62 KB SVPrimarySchool Boise ID Idaho Power Co.png SVPrimarySchool Boise ... 62 KB SVQuickServiceRestaurant Boise ID Idaho Power Co.png

32

Cognitive Science Minor Approval Form Name __________________________________________ ID # _________________________  

E-Print Network (OSTI)

Cognitive Science Minor Approval Form Name __________________________________________ ID: ___________________________________________________ _______________ Cognitive Science Minor Committee Date

Gering, Jon C.

33

Integrated Datasets (IDs) Wood/Bretherton proposal  

E-Print Network (OSTI)

Integrated Datasets (IDs) Wood/Bretherton proposal ID Rationale Space/Time scale; Location; Platforms Parameters Combined Drizzle Dataset (CD ID) Collocated precipitation, aerosol and cloud micro, precip. rate, cloud Cross- Section Dataset (XS-ID) Data on E-W cross- section along 20°S from coast

Wood, Robert

34

EIA-930 Hourly and Daily Balancing ...  

Annual Energy Outlook 2012 (EIA)

not change from day-to-day or hour-to-hour, as specified in the immediately preceding section. For each hour of the day, hourly integrated demand is to be posted within ten...

35

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

in to service. NE-ID-BEA-TSD- 2013-0001 July 16, 2013: BEA discovered that a proper lockouttagout had not been installed for work being performed on the Advanced Test Reactor....

36

B.F.A. in Studio Art Graduation Certification Photography Area of Emphasis Student Name __________________________________ ID# -810______________________rev.2/13  

E-Print Network (OSTI)

time, max. 6 hrs. Student must select 12 hours (4 courses) of 3000 or 4000 level photo area electiveB.F.A. in Studio Art Graduation Certification Photography Area of Emphasis Student Name __________________________________ ID# - 810______________________rev.2/13 Area IV - (12 Hours) Fine Arts - 3 Recommended! hours

Arnold, Jonathan

37

First Responders | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

specialized national-level first responder technical and operational capabilities, and conduct specialized operations, during the initial phases of a response to a radiological...

38

Form EIA-930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

930 930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT INSTRUCTIONS Due Date: mm/dd/yyyy Approved: OMB No. 1905-0129 Approval Expires: 10/31/2016 Burden: 0.19 hours Page 1 Draft for Discussion only PURPOSE Form EIA-930 requires Internet posting of hourly balancing authority operating data. The posted data are used to monitor the current status and trends of the electric power industry, and to support enhancement of electric system operations. REQUIRED RESPONDENTS For the contiguous United States: all entities that are listed in NERC's Compliance Registry as a balancing authority must post balancing authority operating information required by this survey. Other than the Midwest ISO (MISO), registered balancing authorities that are parties

39

NERSC Carver Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Carver Hours Carver Hours Used Carver Hours Used Hopper Usage Chart Hopper Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 01/05/2014 170.00 89.35 01/04/2014 174.38 91.65 01/03/2014 174.15 91.53 01/02/2014 179.72 94.45 01/01/2014 173.76 91.32 12/31/2013 172.25 90.53 12/30/2013 169.62 89.14 12/29/2013 164.72 86.57 12/28/2013 177.92 93.51 12/27/2013 171.61 90.19 12/26/2013 172.74 90.79 12/25/2013 172.13 90.46 12/24/2013 173.48 91.18 12/23/2013 174.92 91.93 12/22/2013 175.26 92.11 12/21/2013 173.58 91.23 12/20/2013 174.50 91.71 12/19/2013 170.02 89.36 12/18/2013 178.25 93.68 12/17/2013 176.17 92.59 12/16/2013 162.03 85.16 12/15/2013 157.09 82.56 12/14/2013 173.40 91.13 12/13/2013 185.02 97.24 12/12/2013 150.91 79.31 12/11/2013 31.67 16.64 12/10/2013 92.44 48.58

40

Responding to Emergencies | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Responding to Emergencies | National Nuclear Security Administration Responding to Emergencies | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Responding to Emergencies Home > About Us > Our Programs > Emergency Response > Responding to Emergencies Responding to Emergencies emergency response logo NNSA serves as the premier technical leader in

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Microsoft Word - DOE-ID-INL-12-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

42

Microsoft Word - DOE-ID-INL-12-012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

43

Location and Hours | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Location and Hours Location The ORNL Research Library is located off the central corridor of Bldg. 4500N on the main ORNL campus. Hours The library is open 24 hours, seven days a...

44

hourly data | OpenEI  

Open Energy Info (EERE)

data data Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. Source U.S. National Renewable Energy Laboratory (NREL) Date Released May 03rd, 2005 (9 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DNI GHI hourly data NREL solar Sri Lanka SWERA TILT TMY UNEP Data application/zip icon Download TMY data (zip, 67.5 MiB)

45

Criticality Safety Basics for INL Emergency Responders  

SciTech Connect

This document is a modular self-study guide about criticality safety principles for Idaho National Laboratory emergency responders. This guide provides basic criticality safety information for people who, in response to an emergency, might enter an area that contains much fissionable (or fissile) material. The information should help responders understand unique factors that might be important in responding to a criticality accident or in preventing a criticality accident while responding to a different emergency.

This study guide specifically supplements web-based training for firefighters (0INL1226) and includes information for other Idaho National Laboratory first responders. However, the guide audience also includes other first responders such as radiological control personnel.

For interested readers, this guide includes clearly marked additional information that will not be included on tests. The additional information includes historical examples (Been there. Done that.), as well as facts and more in-depth information (Did you know ).

INL criticality safety personnel revise this guide as needed to reflect program changes, user requests, and better information. Revision 0, issued May 2007, established the basic text. Revision 1 incorporates operation, program, and training changes implemented since 2007. Revision 1 increases focus on first responders because later responders are more likely to have more assistance and guidance from facility personnel and subject matter experts. Revision 1 also completely reorganized the training to better emphasize physical concepts behind the criticality controls that help keep emergency responders safe. The changes are based on and consistent with changes made to course 0INL1226.

Valerie L. Putman

2012-08-01T23:59:59.000Z

46

Copyright 2004 Auto-ID Labs, All Rights Reserved The Auto-ID Labs  

E-Print Network (OSTI)

2004 Auto-ID Labs, All Rights Reserved Research Projects ­ Seven Major Categories · Auto-ID Technology to create a free flow of models in a network (Internet or Intranet) #12;©Copyright 2004 Auto-ID Labs, All depends on the flow of data for effective management. · Auto-ID and other technologies will increase

Brock, David

47

Emergency Responder Radioactive Material Quick Reference Sheet  

Energy.gov (U.S. Department of Energy (DOE))

This job aid is a quick reference to assist emergency responders in identifying preliminary safety precautions that should be taken during the initial response phase after arrival at the scene of...

48

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production...

49

Definition: Kilowatt-hour | Open Energy Information  

Open Energy Info (EERE)

Kilowatt-hour Kilowatt-hour Jump to: navigation, search Dictionary.png Kilowatt-hour A unit of measure for energy, typically applied to electricity usage; equal to the amount of energy used at a rate of 1,000 watts over the course of one hour. One kWh is equivalent to 3,412 Btu, or 3,600 kJ.[1][2] View on Wikipedia Wikipedia Definition The kilowatt hour, or kilowatt-hour, (symbol kW·h, kW h or kWh) is a unit of energy equal to 1000 watt hours or 3.6 megajoules. For constant power, energy in watt hours is the product of power in watts and time in hours. The kilowatt hour is most commonly known as a billing unit for energy delivered to consumers by electric utilities. Also Known As kWh Related Terms British thermal unit, Electricity, Energy, Kilowatt, energy, electricity generation

50

Aphasia Awareness Training for Emergency Responders: Train the Trainers Background  

E-Print Network (OSTI)

Communication is crucial in emergency situations, but aphasia can affect an individual's ability to state their name or understand a firefighter saying, "Follow me. " Stressful situations often exacerbate the effects of aphasia. Many stroke and brain injury survivors are already at risk in crisis situations because of their physical impairments; those with aphasia can be rendered almost completely vulnerable. While emergency service personnel, such as EMTs and firefighters, rarely receive training on aphasia, they are in fact more likely to encounter a person with aphasia than someone with multiple sclerosis, cerebral palsy or muscular dystrophy (Will & Peters, 2004). However, many of them do not know what aphasia is, much less how to communicate with a person with the disorder. Unfortunately, because few first responders are specifically trained to deal with people with aphasia, they may mistake the aphasia for mental illness or other conditions. This project arose out of one such situation. Misunderstandings may arise and efforts to help people with aphasia may be useless or dangerous. With seed funding from the Christopher and Dana Reeve Foundation, the NAA created a pilot project to train first responders in the New York metropolitan area. The project objectives were to educate police, firefighters, and EMTs in NJ, NY, CT about aphasia, so that they can recognize, communicate with, and respond more effectively to, people with aphasia in routine encounters or in emergency situations. A goal was also to have first responders recognize the Aphasia Awareness symbol/sticker(Figure 1) which is used by persons with aphasia on their vehicles and homes. To further this end, four objectives were established: 1) Developing an outline for aphasia training workshop and pre- and post- tests to measure effectiveness of training. 2) Compilation of a training template package consisting of aphasia training workshop outline, aphasia training video, and NAA materials. 3) Conducting training for at least 15 targeted first responders with the training averaging about an hour and a half in length. 4) Establishing that at least 85 % of workshop participants demonstrate an increased understanding of aphasia.

unknown authors

51

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

52

Document ID Number: RL-721  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform an outdoor, terrestrial ecological research study to attempt to control and deter nesting birds at the 241-C Tank Farm. This will be a preventative study to test possible methods for controlling &/or minimizing the presence and impacts of nesting birds inside the tank farm. A nesting bird

53

RL·721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: REV 3 NEPA REVIEW SCREENING FORM DOE/CX-00045 . J.proj(;l~t Titl~: - - - -- - - - - - - - - - - - - - - - - - -- --------- ------_. . _ - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - LIMITED FIREBREAK MAINTENANCE ON THE HANFORD SITE DURING CALENDAR YEAR 2012 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): The Department of Energy (DOE) proposes to perform firebreak maintenance in selected areas of the Hanford Site during calendar year 2012 with limited use of physical, chemical, and prescribed burning methods. Prescribed burning will be performed by the Hanford Fire Department under approved burn plans and permits; and only in previously disturbed

54

GRR/Section 14-ID-c - Underground Injection Control | Open Energy  

Open Energy Info (EERE)

4-ID-c - Underground Injection Control 4-ID-c - Underground Injection Control < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-c - Underground Injection Control 14IDCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IDAPA 37.03.04 IDAPA 37.03.03 Triggers None specified Click "Edit With Form" above to add content Potential Roadblocks Extensive public comments can stretch the timeline since IDWR must respond to all comments, potentially hold a Fact Finding Hearing, and thoroughly review the input received in these processes prior to making a decision to issue or deny the permit. 14IDCUndergroundInjectionControlPermit.pdf

55

How the Law Responds to Self-Help  

E-Print Network (OSTI)

Lichtman, How the Law Responds to Self-Help (December 2004)the Law Responds to Self-Help secrecy is surely attractive,the Law Responds to Self-Help of illegitimate acts without

Lichtman, Douglas

2005-01-01T23:59:59.000Z

56

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

MM-Group Home MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights LuFeO Unlikely route to ferroelectricity May 16, 2012 A new type of ferroelectric, LuO2Fe4, has been investigated at the APS by a research team from Julich research center. XAS & XMCD studies on beamline 4-ID-C determined the Fe magnetism and valence, while single crystal x-ray scattering measurements at 6-ID-B & 6-ID-D probed the associated structural and charge ordering.

57

Information compression for remote readable ID tags  

Science Journals Connector (OSTI)

Optical identity (ID) tags have been introduced and described to achieve remote target recognition and identification. Optical ID tags usually contain encrypted signatures to be read out, decrypted and verified. In this paper, new features are introduced so that ID tags can be reliably used for remote detection and verification even if the captured tag is extremely degraded by perspective or optical distortion. Optimization of the ID tag size as well as the number of bits required to display the complex-amplitude information are analysed and discussed. The highest compression of grey levels, which corresponds to binary ID tags, is studied. Decryption and verification results are provided to analyse the possibilities of the newly designed optical ID tags.

Sergi Horrillo; Elisabet Prez-Cabr; Mara S Milln

2010-01-01T23:59:59.000Z

58

Local Leaders: Respond to Natural Gas Disruptions | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Disruptions Local Leaders: Respond to Natural Gas Disruptions Local Leaders: Respond to Natural Gas Disruptions Because natural gas is distributed through underground...

59

Electric Vehicle Safety Training for Emergency Responders | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Peer Evaluation Meeting arravt036tiklock2012o.pdf More Documents & Publications Electric Vehicle Safety Training for Emergency Responders U.S. First Responder Safety Training...

60

Electric Vehicle Safety Training for Emergency Responders | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Peer Evaluation arravt036tiklock2011p.pdf More Documents & Publications Electric Vehicle Safety Training for Emergency Responders U.S. First Responder Safety Training...

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hydrogen Safety: First Responder Education | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Safety: First Responder Education Hydrogen Safety: First Responder Education 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

62

College of Design ID Interior Design  

E-Print Network (OSTI)

College of Design ID Interior Design KEY: # = new course * = course changed = course dropped University of Kentucky 2013-2014 Undergraduate Bulletin 1 ID 101 INTRODUCTION TO INTERIOR DESIGN. (1) An introduction to the profession of Interior Design: historical perspective, career specializations, and career

MacAdam, Keith

63

Training For Radiation Emergencies, First Responder Operations- Course Presentation  

Energy.gov (U.S. Department of Energy (DOE))

Presentation slides use in the Training For Radiation Emergencies, First Responder Operations refresher training course.

64

2/21/2014 terragreen.teriin.org/popup.php?section_id=1905&category_id=10 http://terragreen.teriin.org/popup.php?section_id=1905&category_id=10 1/2  

E-Print Network (OSTI)

2/21/2014 terragreen.teriin.org/popup.php?section_id=1905&category_id=10 http://terragreen.teriin.org/popup.php in the material because of the durable nickel alloy and smart aerodynamic design. #12;2/21/2014 terragreen.teriin.org/popup.php?section_id=1905&category_id=10 http://terragreen.teriin.org/popup.php?section_id=1905&category_id=10 2/2 "The

Chiao, Jung-Chih

65

APS Beamline 6-ID-B,C  

NLE Websites -- All DOE Office Websites (Extended Search)

B,C Home B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. Research on this beamline centers on general x-ray scattering studies of materials. The beamline has 2 end-stations: 6-ID-B: Psi -Diffractomter & In-Field Studies 6-ID-C: UHV in-situ growth Recent Research Highlights LSMO pictures Searching for Next-Generation Electronic Materials December 14, 2009 A new class of layered oxide materials discovered thanks to research at the beamline 6-ID-B offers scientists unprecedented opportunities for creating the next generation of electronic devices. Local Contact: Phil Ryan Local Contacts: Philip Ryan (Surface Diffraction) 630.252.0252 ryan@aps.anl.gov

66

Durability of Diesel Engine Particulate Filters (Agreement ID...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Durability of Diesel Engine Particulate Filters (Agreement ID:10461) Durability of Diesel Engine Particulate Filters (Agreement ID:10461) 2013 DOE Hydrogen and Fuel Cells Program...

67

Information and Instructions for Your Office Hours  

E-Print Network (OSTI)

Aug 7, 2014 ... INFORMATION on OFFICE HOURS and INSTRUCTIONS for TAOH. Please view rather than print this information. Current dates can be found...

Dominic Naughton

2014-08-07T23:59:59.000Z

68

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

69

II.CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

1 1 II.CONTRACT ID CODE ~AGE 1 of AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT PAGES AC 5. PROJECT NO. (If applicable) 3. EFFECTNE DATE 2. AMENDMENTfMODIFICA TION NO. 4. REQUISITIONIPURCHASE REQ. NO. See Block 16c. NOPR 7. ADMINISTERED BY (If other than Item 6) CODE 05008 6. ISSUED BY CODE 05008 U.S. Department of Energy National Nuclear Security Administration U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 P.O. Box 2050 Oak Ridge, TN 37831 9A. AMENDMENT OF SOLICITATION NO. 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Y-12, LLC P.O. Box 2009 MS 8014 9B. DATED (SEE ITEM 11) Oak Ridge, TN 37831-8014 lOA. MODIFICATION OF CONTRACT/ORDER NO.

70

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

71

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

72

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

SOLICITATIONIMODIFICATION OF CONTRACT I '. SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

73

MTBE Prices Responded to Natural Gas Prices  

Gasoline and Diesel Fuel Update (EIA)

6 6 Notes: On top of the usual factors impacting gasoline prices, natural gas has had some influence recently. MTBE is an oxygenate used in most of the RFG consumed in the U.S. Generally, it follows gasoline prices and its own supply/demand balance factors. But this winter, we saw it respond strongly to natural gas prices. MTBE is made from methanol and isobutylene, which in turn come from methane and butane. Both methane and butane come from natural gas streams. Until this year, the price of natural gas has been so low that it had little effect. But the surge that occurred in December and January pulled MTBE up . Keep in mind that about 11% MTBE is used in a gallon of RFG, so a 30 cent increase in MTBE is only about a 3 cent increase in the price of RFG. While we look ahead at this summer, natural gas prices should be

74

Responding to chemical attack. Final report  

SciTech Connect

In view of Iraq's stated intention of using chemical weapons in the Persian Gulf War, the Coalition forces must be prepared to respond. Iraq is capable of conducting such an attack. While the use of chemical weapons may not be militarily significant, the political effect of the use and the response to it may be very significant. Responses including the use of chemical and nuclear weapons are assessed in terms of their legality, political cost, and military effectiveness and found unacceptable. Reliance on diplomatic protests and on post-war criminal sanctions are judged ineffective. A response in the form of increased conventional attack on the Iraqi chemical infrastructure is recommended because that response will preserve the present Coalition, effectively counter the chemical attack, contribute to regional stability, and enhance the reputation of the United States for lawfulness and dependability.

Bagley, R.W.

1991-02-11T23:59:59.000Z

75

Biodetection Technologies for First Responders: 2014 Edition  

SciTech Connect

This report summarizes commercially-available, hand-portable technologies that can be used by first responders in the field. This is not meant to be an exhaustive list, nor an endorsement of any technology described herein. Rather, this report is meant to provide useful information about available technologies to help end-users make informed decisions about biodetection technology procurement and use. Information listed in this report is primarily vendor-provided; however, where possible it has been supplemented with additional information obtained from publications, reports, and websites. Manufacturers were given the chance to review summaries of their technologies from August through November 2013 to verify the accuracy of technical specifications, available references, and pricing.

Ozanich, Richard M.; Baird, Cheryl L.; Bartholomew, Rachel A.; Colburn, Heather A.; Straub, Tim M.; Bruckner-Lea, Cindy J.

2014-03-28T23:59:59.000Z

76

1-ID: Sector 1, Insertion Device Beamline  

NLE Websites -- All DOE Office Websites (Extended Search)

1-ID beamline schematic 1-ID beamline schematic ID on-axis brilliance values 1-ID - Sector 1, Insertion Device Beamline Responsible Scientists Jon Almer, phone: (630) 252-1049, e-mail: almer@aps.anl.gov Sarvjit Shastri, phone: (630) 252-0129, e-mail: shastri@aps.anl.gov John Okasinski, phone: (630) 252-0162, e-mail: okasinski@aps.anl.gov Peter Kenesei, phone: (630) 252-0133, e-mail: kenesei@aps.anl.gov Scientific Programs Coupled high-energy SAXS/WAXS studies (HE-SAXS/WAXS) High-energy diffraction microscopy (HEDM) Single-grain studies Stress/strain/texture studies Pair-distribution function (PDF) measurements High-energy fluorescence Source Characteristics Upstream insertion device: APS Undulator A No. of Poles 72 Undulator Period 3.3 cm Device Length 2.4 m Minimum Gap 11 mm Downstream insertion device

77

Property:WFSPTurbineID | Open Energy Information  

Open Energy Info (EERE)

WFSPTurbineID WFSPTurbineID Jump to: navigation, search Property Name WFSPTurbineID Property Type Number This is a property of type Number. Pages using the property "WFSPTurbineID" Showing 25 pages using this property. (previous 25) (next 25) A Alleghany High School Wind Project + 110,608 + Appanoose Elementary School Wind Project + 108,442 + Auburn-Washburn Wind Project + 105,237 + Avery County High School Wind Project + 110,607 + B Bancroft-Rosalie Public Schools Wind Project + 108,812 + Bloomfield Public Schools Wind Project + 110,699 + Burlington High School Wind Project + 107,678 + C CAES Wind Project + 105,329 + Cedar Rapids Wind Project + 105,272 + Cherry Valley Elementary School Wind Project + 120,342 + Concordia High School Wind Project + 108,482 +

78

Winter Study Rebate Form 2012 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2012 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

79

Winter Study Rebate Form 2013 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2013 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

80

Id-1 and Id-2 genes and products as markers of epithelial cancer  

DOE Patents (OSTI)

A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

Desprez, Pierre-Yves (El Cerrito, CA); Campisi, Judith (Berkeley, CA)

2011-10-04T23:59:59.000Z

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Id-1 and Id-2 genes and products as markers of epithelial cancer  

DOE Patents (OSTI)

A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

Desprez, Pierre-Yves (El Cerrito, CA); Campisi, Judith (Berkeley, CA)

2008-09-30T23:59:59.000Z

82

Bradbury Science Museum announces winter opening hours  

NLE Websites -- All DOE Office Websites (Extended Search)

Bradbury Science Museum winter hours Bradbury Science Museum winter hours Bradbury Science Museum announces winter opening hours Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). December 21, 2010 Bradbury Science Museum Bradbury Science Museum Contact Communications Office (505) 667-7000 Often called "a window to the Laboratory," the museum annually attracts thousands of visitors from all over the world. LOS ALAMOS, New Mexico, December 21, 2010-Los Alamos National Laboratory's Bradbury Science Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). On all other days, the museum will observe regular opening hours: from 10 a.m. to 5 p.m. Tuesdays to Saturdays, and from 1 to 5 p.m. Sundays and Mondays. Often called "a window to the Laboratory," the museum annually attracts

83

MARKETING DEPARTMENT Office Hours Fall 2014  

E-Print Network (OSTI)

MARKETING DEPARTMENT Office Hours Fall 2014 NAME OFFICE HOURS COURSE # COURSE TITLE DAY TIME ROOM MKTG 470.2 MKTG 496.1 Marketing Research Marketing & Sales Analytics MW MW 1000-1150 1400-1550 SSW 3620-1400 and by appointment MKTG 498.1-3 MKTG 779.1 MKTG 790.1 MKTG 797.1 MKTG 798.1-3 Investigation & Report Ad. Marketing

Gallo, Linda C.

84

Underground Storage Tank Integrated Demonstration (UST-ID). Technology summary  

SciTech Connect

The DOE complex currently has 332 underground storage tanks (USTs) that have been used to process and store radioactive and chemical mixed waste generated from weapon materials production. Very little of the over 100 million gallons of high-level and low-level radioactive liquid waste has been treated and disposed of in final form. Two waste storage tank design types are prevalent across the DOE complex: single-shell wall and double-shell wall designs. They are made of stainless steel, concrete, and concrete with carbon steel liners, and their capacities vary from 5000 gallons (19 m{sup 3}) to 10{sup 6} gallons (3785 m{sup 3}). The tanks have an overburden layer of soil ranging from a few feet to tens of feet. Responding to the need for remediation of tank waste, driven by Federal Facility Compliance Agreements (FFCAs) at all participating sites, the Underground Storage Tank Integrated Demonstration (UST-ID) Program was created by the US DOE Office of Technology Development in February 1991. Its mission is to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat to concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to the public and the regulators. The UST-ID has focused on five DOE locations: the Hanford Site, which is the host site, in Richland, Washington; the Fernald Site in Fernald, Ohio; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site in Savannah River, South Carolina.

Not Available

1994-02-01T23:59:59.000Z

85

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

D Home D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights A New Family of Quasicrystals A New Family of Quasicrystals June 24, 2013 Scientists from the U.S. Department of Energy's Ames Laboratory and Iowa State University have used the high energy x-rays available on beamline 6-ID-D, to confirm the structure of the only known magnetic rare earth icosahedral binary quasicrystals. Contacts: Alan Goldman & Paul Canfield - Iowa State Univ. & Ames Lab Local Contacts:

86

Requesting a Digital ID | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requesting a Digital ID Requesting a Digital ID Requesting a Digital ID Step One - Registering with MIS To request a DOE Digital Identity you must first register in DOE's Management Information System (MIS) by going to https://mis.doe.gov, selecting "Requesting Access" and following the onscreen instructions. Note: DOE Federal employees are already registered and do not need to complete this step, they may skip to step 2. During the registration process you will be required to search for, and select, a DOE sponsor. Your DOE sponsor is the DOE federal employee that is certifying that you have a recognized relationship with the Department and have a valid need for a DOE Digital Identity. For contractors this person is often your Contract Task Manager, Contracting Officer's Representatives

87

hourly solar radiation | OpenEI  

Open Energy Info (EERE)

solar radiation solar radiation Dataset Summary Description (Abstract): A need for predicting hourly global radiation exists for many locations particularly in Bangladesh for which measured values are not available and daily values have to be estimated from sunshine data. The CPRG model has been used to predict values of hourly Gh for Dhaka (23.770N, 90.380E), Chittagong (22.270N, 91.820E) and Bogra (24.850N, 89.370E) for = ±7.50, ±22.50, ±37.50, ±52.50, ±67.50, ±82.50 and ±97.50 i.e., for ±1/2, ±3/2, ±5/2, ±7/2, ±9/2, ±11/2, ±13/2 hours before and after solar noon and the computed values for Source Renewable Energy Research Centre Date Released October 22nd, 2003 (11 years ago) Date Updated Unknown Keywords Bangladesh documentation hourly solar radiation SWERA

88

Ethics and Public Health 3 credit hours  

E-Print Network (OSTI)

PUB H Ethics and Public Health 3 credit hours Summer, 2009 Instructor: Ann Cook, PhD, MPA, Research U.S. public health policies. The course begins with a rationale for studying the ethical dimensions of public health and then examines ethical decisonmaking in arenas such as policy development, research

Vonessen, Nikolaus

89

Credit Based; Beginning Swimming Credit/Hour  

E-Print Network (OSTI)

the pool. To be able to swim at least 50 yards with one of the learned strokes. Required Materials: Swim. Make-Ups: Only two make-ups allowed by swimming laps during open swim/lap swim at MSU pool. Lap swimCredit Based; Beginning Swimming Credit/Hour s Class Title Lead Instructo r Phone Email Office

Maxwell, Bruce D.

90

Project Management Foundation 21 hours, $895  

E-Print Network (OSTI)

Project Management Foundation 21 hours, $895 The fundamental project management processes. In group exercises, participants gain an understanding of how the project management processes are used during each phase of a project to build a better, more effective project plan. Topics Include

Alabama in Huntsville, University of

91

2009-2010 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2009-2010 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6 or satisfactory placement test score Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31

Grissino-Mayer, Henri D.

92

2007-2008 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2007-2008 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-4 ___ Math 119 or 123 or satisfactory placement test score TOTAL 32-33 Second Year Advertising 250 3 ___ Advertising 310 3 ___ Adv 250 and admission to the major TOTAL 31 Third Year Psychology 110 3 ___ Business

Grissino-Mayer, Henri D.

93

2011-12 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2011-12 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

94

2010-11 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2010-11 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

95

2012-13 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2012-13 Advertising Curriculum Hours PREREQUISITES First Year English 101*, 102* 6 Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241*, 242* or 261*, 262* 6 ___ ___ 4 English or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31 Third Year Psychology 110

Grissino-Mayer, Henri D.

96

DOE Responds to Advisory Board Recommendation | Department of...  

Energy Savers (EERE)

Board Recommendation August 12, 2014 - 1:37pm Addthis The Department of Energy's (DOE) Oak Ridge Office of Environmental Management (EM) has responded to a recommendation made...

97

NNSA helps train first responders in Czech Republic | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

train first responders in Czech Republic | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

98

ORISE: REAC/TS trains emergency responders in preparation for...  

NLE Websites -- All DOE Office Websites (Extended Search)

REACTS trains emergency responders in preparation for Pan American Games Workshop in Mexico helps medical professionals prepare for treating victims of radiological or nuclear...

99

Responding to WMD Terrorism Threats: The Role of Insurance Markets  

E-Print Network (OSTI)

the Biological Weapons and Bioterrorism Threat SSI http://Responding to WMD Terrorism Threats: The Role of InsuranceNeed for Comprehensive Threat and Risk Assessments of

Jaffee, Dwight M.; Russell, Thomas

2007-01-01T23:59:59.000Z

100

Livermore researchers create new technology for first responders...  

National Nuclear Security Administration (NNSA)

researchers create new technology for first responders | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Secretary of Energy's First Biennial Report to Congress Responding...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Secretary of Energy's First Biennial Report to Congress Responding to Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) Findings and Recommendations during Fiscal Year...

102

NERSC Edison Phase I Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Edison Phase I Hours Used Edison Phase I Hours Used Edison Phase I Hours Used Edison Usage Chart Edison Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 06/23/2013 0.226 88.6 06/22/2013 0.239 93.9 06/21/2013 0.248 97.1 06/20/2013 0.240 94.0 06/19/2013 0.233 91.3 06/18/2013 0.245 96.0 06/17/2013 0.251 98.4 06/16/2013 0.243 95.3 06/15/2013 0.245 95.9 06/14/2013 0.246 96.5 06/13/2013 0.240 94.1 06/12/2013 0.128 50.4 06/11/2013 0.215 84.5 06/10/2013 0.225 88.4 06/09/2013 0.228 89.6 06/08/2013 0.225 88.3 06/07/2013 0.121 47.5 06/06/2013 0.223 87.4 06/05/2013 0.250 98.0 06/04/2013 0.234 91.6 06/03/2013 0.218 85.5 06/02/2013 0.246 96.4 06/01/2013 0.230 90.0 05/31/2013 0.215 84.5 05/30/2013 0.212 83.1 05/29/2013 0.223 87.3 05/28/2013 0.237 93.0 05/27/2013 0.226 88.5 05/26/2013 0.229 89.9

103

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval)  

E-Print Network (OSTI)

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval year. The Graduate Student Coordinator for Health Promotion is responsible for assisting the Fitness & Health Promotion Coordinator in the development, promotion, management and implementation of Campus Rec

Lafferriere, Gerardo

104

Society, Technology and the Environment-3credit hours Spanish for Engineering-6 credit hours  

E-Print Network (OSTI)

Society, Technology and the Environment- 3credit hours Spanish for Engineering- 6 credit hours 21st May to 22nd June 2012 The University of Alabama College of Engineering in collaboration with Pamplona for any student interested in technology and the environment; students will have the opportunity to study

Simaan, Nabil

105

Applications of IDS: Mead's Challenge (What is  

E-Print Network (OSTI)

· Orientation · Adaptability · Dynamic motor skill acquisition #12;Derek Harter IJCNN 2005, IDS Workshop Aug 5 Connectionism / NN · Better understand biological basis of computation Penrose Quantum Computation · Actual quantum computation at cell level Mead (IJCNN 2005 Plenary) · Structure supports exponential scaling

Andras, Peter

106

11. CONTRACT ID CODE IPAG~ OF PAGES  

E-Print Network (OSTI)

11. CONTRACT ID CODE IPAG~ OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 2 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS # 032987476 DE-AC05-76RL01830l8l 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

107

Mercury Chamber NF-IDS Meeting  

E-Print Network (OSTI)

-Battelle for the U.S. Department of Energy Mercury Chamber Update Oct 2011 Starting Point: Coil and Shielding Concept IDS120H #12;3 Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Update Oct 2011 · Penetrations (ports) into chamber ­ Nozzle ­ Hg drains (overflow and maintenance) ­ Vents (in and out) ­ Beam

McDonald, Kirk

108

ID3, SEQUENTIAL BAYES, NAIVE BAYES AND BAYESIAN NEURAL NETWORKS  

E-Print Network (OSTI)

to ID3. ID3 learning algorithm (Quinlan 1979) and its successors ACLS (Paterson & Niblett 1982), C4#cient in many learning tasks. It is shown how Sequential Bayes can be transformed into ID3 by replacing of network's execution (Kononenko 1989) enables the us­ age of a neural network as an expert system shell

Kononenko, Igor

109

Faculty Office Hours Fall 2014 Aberle, James  

E-Print Network (OSTI)

Faculty Office Hours Fall 2014 Aberle, James GWC 326 01:30 PM 02:45 PMM T W F to Tuesday is through:30 AMR to Coleman, James BYENG 450 08:45 AM 09:45 AMT R to By Appointment Cotter, Jeff GWC 424 03:15 PM:00 AM 09:30 AMF to Or at a time arranged via e-mail to reisslein@asu.edu Rodriguez, Armando GWC 352 10

Zhang, Yanchao

110

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production  

NLE Websites -- All DOE Office Websites (Extended Search)

Hour-by-Hour Cost Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Genevieve Saur (PI), Chris Ainscough (Presenter), Kevin Harrison, Todd Ramsden National Renewable Energy Laboratory January 17 th , 2013 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Acknowledgements * This work was made possible by support from the U.S. Department of Energy's Fuel Cell Technologies Office within the Office of Energy Efficiency and Renewable Energy (EERE). http://www.eere.energy.gov/topics/hydrogen_fuel_cells.html * NREL would like to thank our DOE Technology Development Managers for this project, Sara Dillich, Eric Miller, Erika Sutherland, and David Peterson. * NREL would also like to acknowledge the indirect

111

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I '. I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

112

20140430_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

2014-05-05T23:59:59.000Z

113

Green Machine Florida Canyon Hourly Data 20130731  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

2013-08-30T23:59:59.000Z

114

20130416_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

2013-04-24T23:59:59.000Z

115

Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

2013-07-15T23:59:59.000Z

116

Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

117

20130416_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

118

20140430_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

119

Green Machine Florida Canyon Hourly Data 20130731  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

120

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ( I. ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I. ID CODE / DE-ACO4-OOAL6662O ' 10s. DATED (SEE ITEM 13) PAGE I OF 2 PAGES Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Property:DSIRE/Id | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:DSIRE/Id Jump to: navigation, search This is a property of type String. DSIRE Incentive Code. Pages using the property "DSIRE/Id" Showing 25 pages using this property. (previous 25) (next 25) 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) + US04F + 3 30% Business Tax Credit for Solar (Vermont) + VT31F + A AEP (Central and North) - CitySmart Program (Texas) + TX141F + AEP (Central and North) - Residential Energy Efficiency Programs (Texas) + TX116F + AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) + TX119F + AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) + TX141F + AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) + TX138F +

122

Cleanroom After-Hours Policy Original: 11/04  

E-Print Network (OSTI)

Cleanroom After-Hours Policy Original: 11/04 Revised: 2//05 CAMD strives to maintain and improve laboratory and User safety along with User efficiency. After- Hours work inside the cleanroom (CR + all hours of LSU Staff holidays. After-Hours Access Request · Cleanroom-trained Users can apply for CR

123

Guidelines for Use MIT Libraries' 24 Hour Study Space  

E-Print Network (OSTI)

Guidelines for Use MIT Libraries' 24 Hour Study Space Access to and use of the MIT Libraries' 24://libguides.mit.edu/hours)). The following principles guide access to 24-hour spaces for all users of the MIT Libraries: Expectations Library policies Behavior Library users in the 24-hour study spaces are expected to refrain from: � Behaviors

124

Homeowners: Respond to Fuel Shortages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Homeowners: Respond to Fuel Shortages Homeowners: Respond to Fuel Shortages Homeowners: Respond to Fuel Shortages Homeowners: Respond to Fuel Shortages Natural disasters and other hazards can impact the energy industry's ability to produce and distribute petroleum products, including gasoline, diesel fuel, and heating oil. At the same time, the demand for fuel may spike due to evacuations, or because consumers are buying more fuel to power backup generators during electrical outages. All these factors may lead to fuel shortages, which will prompt local authorities and fuel suppliers to prioritize getting fuel to key assets such as emergency operations centers, hospitals, food supply dealers, water supply plants, and telecommunication networks. Homeowners should keep the following tips in mind:

125

Responding to Solicitations Under DOE Work For Others Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONDING TO SOLICITATIONS RESPONDING TO SOLICITATIONS UNDER DOE WORK FOR OTHERS PROGRAM PURPOSE: To provide guidance on the Department's policy related to DOE's laboratories ability to respond to solicitations from non-DOE sponsors under the Work for Others (WFO) program. SCOPE: This chapter provides guidance on the effect of laws, regulations, and statutes to DOE/NNSA WFO policy related to the prohibition of DOE Federally Funded Research and Development Centers (FFRDCs) and other facilities from competing directly with the domestic private sector. Particular emphasis is placed on WFO requirements governing how a DOE/NNSA site/facility management contractor operating an FFRDC or other DOE/NNSA facility may respond to Broad Agency Announcements (BAAs), financial assistance solicitations, Program Research and

126

Local Leaders: Respond to Natural Gas Disruptions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Energy Assurance » Emergency Preparedness » Community Services » Energy Assurance » Emergency Preparedness » Community Guidelines » Local Leaders: Respond to Natural Gas Disruptions Local Leaders: Respond to Natural Gas Disruptions Local Leaders: Respond to Natural Gas Disruptions Because natural gas is distributed through underground pipelines, delivery disruptions occur less often than electrical outages. Severe storms, flooding, and earthquakes can expose and break pipes, however. When disruptions do occur, it can take weeks or even months to restore. Communicate effectively with the public, and ensure that first responders and gas companies have everything they need to speed up restoration efforts. Effectively communicate with the public-It may be necessary to explain to the public why it takes longer to restore natural gas service

127

Washington v. DOE - Respondents' Response in Opposition to Petitioner's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington v. DOE - Respondents' Response in Opposition to Washington v. DOE - Respondents' Response in Opposition to Petitioner's Motion Washington v. DOE - Respondents' Response in Opposition to Petitioner's Motion Department of Energy's response brief in opposition to the State of Washington's petition for review before the D.C. Circuit; Washington asked the Court to review DOE's decision to terminate development of a high-level waste repository at Yucca Mountain, and to issue a preliminary injunction enjoining DOE from taking further action to terminate the program. Washington v. DOE - Respondents' Response in Opposition to Petitioner's Motion More Documents & Publications U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE BOARD'S RULING ON THE MOTION TO WITHDRAW DOE's Petition for Interlocutory Review

128

Patterns for responding to climate in shared-wall housing  

E-Print Network (OSTI)

Out of the inescapables of building come inspiration for architectural design. Decisions which respond to climate make their mark in design, just as structural requirements, lighting provisions, and the limitations of a ...

Paulos, Susan Kaufmann

1982-01-01T23:59:59.000Z

129

Guidelines and Procedures for Responding to Allegations of  

E-Print Network (OSTI)

Guidelines and Procedures for Responding to Allegations of Research Misconduct1 February 11, 2009 1 Formerly, Operating Rules and Procedures of the Standing Committee on Research Misconduct 1 #12;Table. Voting Procedures

Stowell, Michael

130

NNSA participates in nationwide RadResponder drill | National...  

National Nuclear Security Administration (NNSA)

were able to see the progress live throughout the day. Periodic situation briefings were led by the DOE's Consequence Management Home Team while analyzing RadResponder data and...

131

Emergency First Responders' Experience with Colorimetric Detection Methods  

SciTech Connect

Nationwide, first responders from state and federal support teams respond to hazardous materials incidents, industrial chemical spills, and potential weapons of mass destruction (WMD) attacks. Although first responders have sophisticated chemical, biological, radiological, and explosive detectors available for assessment of the incident scene, simple colorimetric detectors have a role in response actions. The large number of colorimetric chemical detection methods available on the market can make the selection of the proper methods difficult. Although each detector has unique aspects to provide qualitative or quantitative data about the unknown chemicals present, not all detectors provide consistent, accurate, and reliable results. Included here, in a consumer-report-style format, we provide boots on the ground information directly from first responders about how well colorimetric chemical detection methods meet their needs in the field and how they procure these methods.

Sandra L. Fox; Keith A. Daum; Carla J. Miller; Marnie M. Cortez

2007-10-01T23:59:59.000Z

132

Webinar: National Hydrogen Safety Training Resource for Emergency Responders  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department's Fuel Cell Technologies Office announces the launch of a new, free, online national hydrogen safety training resource for emergency responders. This webinar will provide additional details about the emergency response hydrogen training resource.

133

hourly emission factors | OpenEI  

Open Energy Info (EERE)

60 60 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278660 Varnish cache server hourly emission factors Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago)

134

Estimation of hourly global and diffuse solar radiation from hourly sunshine duration  

SciTech Connect

A statistical procedure has been employed to develop correlations of monthly-mean-hourly global and diffuse solar radiation on a horizontal surface to hourly sunshine duration. Several years of measured data on solar radiation and sunshine duration, reported in the literature for two stations in the southern African region, is employed for this purpose. The applicability of the developed correlations is tested by estimating solar radiation for a new location. The excellent agreement between the measured and estimated data for that station the wide applicability of the method.

Gopinathan, K.K (National Univ. of Lesotho, Roma (South Africa))

1992-01-01T23:59:59.000Z

135

Facility Representative Program ID Selects FR of the Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program ID Selects Facility Representative Program ID Selects FR of the Year John Martin DOE-ID Facility Representative John Martin DOE-ID Facility Representative of the Year. John Martin was selected as DOE-ID's Facility Representative of the Year and the office's nominee for the 2007 DOE Facility Representative of the Year Award. John was selected from an exceptional field of candidates to represent DOE-ID at the Facility Representative Annual Workshop in Las Vegas this May. Each year the Department of Energy recognizes the Facility Representative whose achievements during the calendar year are most exemplary. A panel of senior personnel representing the Office of Health, Safety and Security (HSS) National Nuclear Security Administration (NNSA), Environmental Management (EM), Science (SC), Nuclear Energy (NE) and at least five

136

Microsoft Word - DOE-ID-INL-12-015.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 15 SECTION A. Project Title: Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement SECTION B. Project Description: The purpose of this project is to permanently close and remove the Materials and Fuels Complex (MFC) 4,000 gallon bio-diesel underground storage tank (UST) [Site ID# 7230/Facility ID # 6-120614/Tank ID # 99ANL00013] and remove the 1,000 gallon E-85 aboveground storage tank (AST) [Site ID# 7230/Facility ID# 6-120614/Tank ID# 05MFC00035] and replace the two tanks with a 10,000 gallon aboveground storage tank (AST) split tank (5,000 gallons for bio-diesel/5,000 gallons for E-85). The 4,000 gallon bio-diesel UST and the 1,000 gallon E-85 AST are located in the parking lot area near building MFC-701.

137

2011 Annual Planning Summary for Idaho Operations Office (ID)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management).

138

RAPID/Roadmap/8-ID-c | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us 8-ID-c Certificate of Public Convenience and...

139

Microsoft Word - DOE-ID-10-003.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Description The state of Idaho receives funding from the Department of Energy to conduct independent oversight and monitoring of DOE-ID operations. Oversight activities...

140

Entity Name: ABC Company Entity ID:  

Gasoline and Diesel Fuel Update (EIA)

Entity Name: Entity Name: ABC Company Entity ID: 00000 Data Year: 2013 State Include or exclude pre-arranged interruptions? 1 2 3 Do you capture outage records for events that initiate outside your system (customer system that causes di 4 5 6 7 8 Point to calculation in P1782: use percentages weighted based upon the classification of the circuit. 9 10 11 12 REWORD: The percent of customers automatically reported when they have lost power? e.g. SCADA, AMI, Etc. 13 SAIDI value (w/o Major Events included) FORM EIA-861 OMB No. 1905-0129 ANNUAL ELECTRIC POWER INDUSTRY REPORT

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Monitoring Energy Infrastructure, Responds as Isaac Makes Landfall |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitoring Energy Infrastructure, Responds as Isaac Makes Monitoring Energy Infrastructure, Responds as Isaac Makes Landfall DOE Monitoring Energy Infrastructure, Responds as Isaac Makes Landfall August 29, 2012 - 11:45am Addthis Hurricane Isaac is makes its way toward the Gulf Coast and the Energy Department provides details on the storm’s impact, and the recovery and restoration activities being undertaken. | Photo courtesy of NOAA Hurricane Isaac is makes its way toward the Gulf Coast and the Energy Department provides details on the storm's impact, and the recovery and restoration activities being undertaken. | Photo courtesy of NOAA William Bryan William Bryan Deputy Assistant Secretary of Infrastructure Security and Energy Restoration What To Do During The Storm Listen to the direction of local authorities.

142

Local Leaders: Respond to an Energy Emergency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Respond to an Energy Emergency Respond to an Energy Emergency Local Leaders: Respond to an Energy Emergency Gather information-Tap the energy and emergency contacts you established before the disaster occurred to gather information and assess the nature of the emergency before moving forward with your response. What immediate damage has impacted energy assets? What is the extent of the damage? Who in the community is currently impacted? Is it possible to provide the community access to a place unaffected by the energy emergency if needed? How long will it take to restore the community to pre-emergency conditions? Effectively communicate with the public-Ensure quick information from local officials and energy suppliers is readily available and accessible, via radio, television, newspapers, the Internet, social media,

143

NNSA, IAEA Conduct Emergency Response Training for First Responders for  

National Nuclear Security Administration (NNSA)

IAEA Conduct Emergency Response Training for First Responders for IAEA Conduct Emergency Response Training for First Responders for Ports and Customs | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA, IAEA Conduct Emergency Response Training for ... Press Release NNSA, IAEA Conduct Emergency Response Training for First Responders for

144

Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A veren, Inc., A veren, Inc., Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2010- CW- 0711 Issued: October 6, 2010 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Averen, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements at 10 C.F.R. § 430.62. 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the

145

Energy Department Emergency Response Team Ready to Respond to Hurricane  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Emergency Response Team Ready to Respond to Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene’s landfall moment. | Image courtesy of NOAA Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene's landfall moment. | Image courtesy of NOAA Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability

146

Responding To Hurricane Sandy: DOE Situation Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responding To Hurricane Sandy: DOE Situation Reports Responding To Hurricane Sandy: DOE Situation Reports Responding To Hurricane Sandy: DOE Situation Reports November 7, 2012 - 11:15am Addthis Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. on October 29, with top sustained winds of 80 mph. | Photo courtesy of NOAA. Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. on October 29, with top sustained winds of 80 mph. | Photo courtesy of NOAA. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov What are the key facts? For more information about emergency preparedness, visit Ready.gov. For the latest news on Hurricane Sandy, visit the FEMA blog. November 7, 2012 - 4:02pm: Reports on Hurricane Sandy can now be found in

147

BNL | Center for Functional Nanomaterials Hours of Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

CFN Hours of Operation CFN Hours of Operation Normal working hours at the CFN are 8 a.m. to 6 p.m. Working Outside of Normal Hours CFN scientific and technical personnel, as well as external users, may need to work outside of normal operating hours, during which time support is limited and many colleagues may not be around. Therefore, working outside the 8 a.m. to 6 p.m. envelope on weekdays, or anytime on weekends and holidays, requires special precautions, especially if working in a laboratory. CFN users are expected to work at the CFN during normal working hours. Users with extensive experience working at the CFN may be granted permission by the appropriate facility leader and ES&H Coordinator to work after hours. Users first must complete the Request to Work After-Hours at

148

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTRACT ID CODE CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

149

Id-1 and Id-2 genes and products as therapeutic targets for treatment of breast cancer and other types of carcinoma  

DOE Patents (OSTI)

A method for treatment and amelioration of breast, cervical, ovarian, endometrial, squamous cells, prostate cancer and melanoma in a patient comprising targeting Id-1 or Id-2 gene expression with a delivery vehicle comprising a product which modulates Id-1 or Id-2 expression.

Desprez, Pierre-Yves; Campisi, Judith

2014-09-30T23:59:59.000Z

150

Summer 2013 The above schedule is in effect from Monday, May 19 until Friday,August 22.All students enrolled for Summer or Fall courses are granted full access on their University ID card to enter the Recreation  

E-Print Network (OSTI)

the Recreation Center. Faculty and staff with active University ID cards are granted access to the Rec Center on weekdays from 5:45 a.m. to 12:30 p.m. for Open Recreation activities only (afternoon, evening and.m.Boot Camp (Stephanie - 106) RECREATION CENTER HOURS Summer 2014 For program information and the most up

Suzuki, Masatsugu

151

Usage Codes Observer code Vessel code Trip ID  

E-Print Network (OSTI)

Usage Codes 1 5 2 6 3 7 4 8 Sonar Observer code Vessel code Trip ID Additional Information KHz: RPM / Other _______________Global Registry ID:MMSI No. Permit expiration (dd-mm- yy): Y / N Present? Usage contact Diver / dive equipment Usage Manufacturer Hull mounted / towed Catch Y / N Other: Y / N Y / NOther

152

Curvature in nematic elastica responding to light and heat  

Science Journals Connector (OSTI)

...elastica responding to light and heat M. Warner 1 * C. D. Modes...develop a gradient of response to heat, light and other stimuli...in micro-fluidic mixers and pumps where artificial cilia are of...nematic solids responsive to heat or light as in this paper...

2010-01-01T23:59:59.000Z

153

Training For Radiation Emergencies, First Responder Operations- Student Guide  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this program is to provide refresher operations training, as well as in-depth training in radiation, to fire fighters who are currently trained to the National Fire Protection Association (NFPA) Standard for Professional Competence of Responders to Hazardous Materials (NFPA 472).

154

Training For Radiation Emergencies, First Responder Operations- Instructors Guide  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this program is to provide refresher operations training, as well as in-depth training in radiation, to fire fighters who are currently trained to the National Fire Protection Association (NFPA) Standard for Professional Competence of Responders to Hazardous Materials (NFPA 472).

155

IDS Climate Change and Development Centre Resources | Open Energy  

Open Energy Info (EERE)

IDS Climate Change and Development Centre Resources IDS Climate Change and Development Centre Resources Jump to: navigation, search Tool Summary Name: IDS Climate Change and Development Centre Resources Agency/Company /Organization: Institute of Development Studies Sector: Energy, Land Topics: Policies/deployment programs Resource Type: Workshop, Publications, Training materials, Lessons learned/best practices References: Institute of Development Studies CCDC[1] Logo: IDS Climate Change and Development Centre Resources CCDC promotes "collaborative research and policy analysis, delivering high quality research programmes, knowledge services, teaching and training." References ↑ "Institute of Development Studies CCDC" Retrieved from "http://en.openei.org/w/index.php?title=IDS_Climate_Change_and_Development_Centre_Resources&oldid=375095"

156

Identification of Staphylococcus species and subspecies with the MicroScan Pos ID and Rapid Pos ID panel systems.  

Science Journals Connector (OSTI)

...hybridization. The Pos ID panel uses a battery of 18 tests, and the Rapid Pos ID panel uses a battery of 42 tests for the identification of Staphylococcus...Johnson. 1969. A batch procedure for thermal elution of DNA from hydroxyapatite. Anal...

W E Kloos; C G George

1991-04-01T23:59:59.000Z

157

Beamline 4-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 2011 2010 2009 2008 All Sector 4 Pubs. APS Pubs. Database Recent 4-ID-D Publications Publications 2013:(13) "Classical and quantum phase transitions revealed using transport and x-ray measurements," Arnab Banerjee, Ph.D.-Thesis, University of Chicago, 2013. "Charge transfer and multiple density waves in the rare earth tellurides," A. Banerjee, Yejun Feng, D.M. Silevitch, Jiyang Wang, J.C. Lang, H.-H. Kuo, I.R. Fisher, T.F. Rosenbaum, Phys. Rev. B 87, 155131 (2013). "Local structure, stripe pinning, and superconductivity in La1.875Ba0.125CuO4 at high pressure," G. Fabbris, M. Hücker, G.D. Gu, J.M. Tranquada, D. Haskel, Phys. Rev. B 88, 060507(R) (2013). "Different routes to pressure-induced volume collapse transitions in

158

SLAC Dosimeter / ID Request Form A  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 SLAC Dosimeter / ID Request Form A (For applicants who have completed SLAC Environment, Safety, and Health Training) Sections 1-5 completed by applicant. Section 1: Contact Information Last name: First name: MI: Male Female Birth year (yyyy): Job title: Contact information/mailing address: City: State: Zip code: Country: Dept/Group: Phone number: Mail stop: Users or non-SLAC employees only: List employer, company, or university : Section 2: Identification Badge Request I am applying for my first SLAC identification badge; I have successfully completed the following ES&H training (indicate all that apply): SON SOC EOESH GERT RWT I RWT II

159

Beamline 6-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 2011 2010 2009 2008 All Sector 6 Pubs. APS Pubs. Database Recent 6-ID-D Publications Publications 2013:(24) "Controlling Size-Induced Phase Transformations Using Chemically Designed Nanolaminates," Matt Beekman, Sabrina Disch, Sergei Rouvimov, Deepa Kasinathan, Klaus Koepernik, Helge Rosner, Paul Zschack, Wolfgang S. Neumann, David C. Johnson, Angew. Chem. Int. Ed. 52, 13211 (2013). "Thermophysical and Structural Measurements of Liquid Metallic Alloys Using Electrostatic Levitation," James Christopher Bendert, Ph.D.-Thesis, Washington University , 2013. "Pair distribution function analysis of X-ray diffraction from amorphous spheres in an asymmetric transmission geometry: application to a Zr58.5Cu15.6Ni12.8Al10.3Nb2.8 glass," J.C. Bendert, N.A. Mauro, K.F. Kelton, J. Appl. Crystallogr. 46, 999

160

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Homeowners: Respond to Power Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Outages Power Outages Homeowners: Respond to Power Outages Homeowners: Respond to Power Outages After a disaster, electric utilities and government officials will first work to restore power to critical infrastructure like power plants and transmission lines, water treatment facilities, and telecommunications networks, and also to hospitals, critical care facilities, and emergency response agencies. It may take several days or even weeks to restore power to individual homeowners, but here's what you can do to help prepare and recover power more quickly: Charge mobile devices-If you have power, charge your cell phones, laptops, and other mobile devices so they'll have the maximum amount of battery power stored in the event of a power outage. These devices will help you communicate with your power company, and they'll help you stay

162

Homeowners: Respond to Natural Gas Disruptions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Disruptions Natural Gas Disruptions Homeowners: Respond to Natural Gas Disruptions Homeowners: Respond to Natural Gas Disruptions Because natural gas is distributed through underground pipelines, delivery disruptions occur less often than electrical outages. Severe storms, flooding, and earthquakes can expose and break pipes, however. When disruptions do occur, it can take weeks or even months to restore. Homeowners should take care in identifying and reporting any problems, as they may pose substantial risk to public health and safety. A break in a natural gas pipeline can lead to fires and/or explosions. Many of the following guidelines would apply if you detect a propane tank leak, as well. Contact your propane retailer or local fire department in an emergency. Detect a problem-A natural gas leak can be detected by smell,

163

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

164

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

National Nuclear Security Administration (NNSA)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

165

Property:HPBD/ProjectId | Open Energy Information  

Open Energy Info (EERE)

ProjectId ProjectId Jump to: navigation, search This is a property of type Number. Pages using the property "HPBD/ProjectId" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 203 + High Performance Buildings Database + 358 + High Performance Buildings Database + 71 + High Performance Buildings Database + 833 + High Performance Buildings Database + 247 + High Performance Buildings Database + 20 + High Performance Buildings Database + 498 + High Performance Buildings Database + 132 + High Performance Buildings Database + 194 + High Performance Buildings Database + 323 + High Performance Buildings Database + 50 + High Performance Buildings Database + 785 + High Performance Buildings Database + 223 +

166

Hospital Triage in First Hours After Nuclear or Radiological...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hospital Triage in the First 24 Hours after a Nuclear or Radiological Disaster Medical professionals with the Radiation Emergency Assistance CenterTraining Site (REACTS) at the...

167

Delayed Start or Cancellation of Business Hours | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

if you have questions. When regular business hours are suspended The laboratory may not conduct regular operations because of inclement weather. In this case, employees are not...

168

Microsoft Word - DOE-ID-INL-13-025.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

No.: DOE-ID-INL-13-025 SECTION A. Project Title: Willow Creek Building Pedestrian Bridge Replacement SECTION B. Project Description: The purpose and need for the proposed...

169

Microsoft Word - DOE-ID-INL-14-044.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DETERMINATIO Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-14-044 SECTION A. Project Title: Materials and Fuels Complex (MFC)-752 Analytical Laboratory Water...

170

RAPID/Roadmap/6-ID-b | Open Energy Information  

Open Energy Info (EERE)

6-ID-b Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Permit Overview Not provided Click "Edit With Form" above to add content...

171

RAPID/Roadmap/18-ID-c | Open Energy Information  

Open Energy Info (EERE)

8-ID-c Wastewater Pretreatment Permit 18IDCWastewaterPretreatmentPermit.pdf Click to View Fullscreen Permit Overview Industrial wastewater permits are issued at the local level. If...

172

Eastport, ID Natural Gas Pipeline Imports From Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

data. Release Date: 1302015 Next Release Date: 2272015 Referring Pages: U.S. Natural Gas Pipeline Imports by Point of Entry Eastport, ID Natural Gas Imports by Pipeline from...

173

Credit Based; Beginning Swimming Credit/Hours Class  

E-Print Network (OSTI)

Center Pool Course Description: Beginning swimming skills and water safety. Prerequisites: Must about experience at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be postedCredit Based; Beginning Swimming Credit/Hours Class Title Lead Instructor Phone Email Office Hours

Maxwell, Bruce D.

174

General Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit Hours ENGN 110 2 ECE 111 2  

E-Print Network (OSTI)

: 128 ** Meets philosophy and ethics general education requirement. Electrical engineering majors mustGeneral Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit (C or better required) 3 PHYS 231N 4 COMM 101R 3 General Education and Major Coursework: Credit Hours

175

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

176

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

177

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Over a Billion Supercomputing Hours to Address Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life sciences, and materials science.

178

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Over a Billion Supercomputing Hours to Address DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life

179

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

180

DOE's Office of Science Awards 18 Million Hours of Supercomputing...  

Office of Environmental Management (EM)

Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific...

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

SunShot Announces 24-Hour Solar Data Hackathon  

Energy.gov (U.S. Department of Energy (DOE))

SunShot will host a 24-hour solar data hackathon at the 2014 SunShot Grand Challenge Summit. Learn more over at the EERE blogand register here.

182

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

This Order establishes requirements and responsibilities for the management of pay, including overtime and compensatory time, leave administration, and hours of duty. Cancels DOE O 322.1A. Canceled by DOE O 322.1C.

2005-01-14T23:59:59.000Z

183

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1

2011-01-19T23:59:59.000Z

184

Smashing science: Livermore scientists discover how explosives respond to  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 For immediate release: 12/12/2013 | NR-13-12-03 High Resolution Image A schematic representation of the shock experiment. The resulting energy release pushed the shock front to the left. Image by Liam Krauss/LLNL. Smashing science: Livermore scientists discover how explosives respond to shockwaves Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov Watch Video A laser pulse impinging on an aluminum ablation layer (which is coated on a glass substrate to the right), which generates a rapidly expanding plasma. This small explosion pushes the ablator to the left and drives a shock wave in the sample. The experiment simultaneously measures the speed of the shock wave in the sample, and the speed of the ablator expansion, which allows Livermore researchers to estimate the pressure and density of the

185

How to Respond to data Requests in Portfolio Manager  

NLE Websites -- All DOE Office Websites (Extended Search)

"How To" Series How to Respond to Data Requests in Portfolio Manager ® EPA's ENERGY STAR Portfolio Manager tool helps you measure and track the energy use, water use, and greenhouse gas emissions of your properties, all in a secure online environment. You can use the results to identify under-performing buildings, set investment priorities, verify efficiency improvements, and receive EPA recognition for superior energy performance. Portfolio Manager provides the ability for organizations wishing to collect data from a variety of individuals to develop and use a custom Data Request within Portfolio Manager. You may receive Data Requests from other users or organizations to provide property or portfolio data as part of a program or initiative. Each request includes a

186

Three Human Cell Types Respond to Multi-Walled Carbon Nanotubes...  

NLE Websites -- All DOE Office Websites (Extended Search)

Human Cell Types Respond to Multi-Walled Carbon Nanotubes and Titanium Dioxide Nanobelts with Cell-Specific Transcriptomic Three Human Cell Types Respond to Multi-Walled Carbon...

187

Nationwide: National Fire Protection Association Provides Training to First Responders on EVs/PEVs  

Office of Energy Efficiency and Renewable Energy (EERE)

DOE is helping develop a strong workforce to support the adoption of plug-in electric vehicles, including first responders.

188

Building Energy Software Tools Directory: ID-Spec Large  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-Spec Large ID-Spec Large ID-Spec Large is software for the electrical installation design of industrial and tertiary buildings. It helps to design a green electrical installation by enabling the user to: - Assess the impact of selecting energy efficiency solutions like power factor correction and low losses transformers in terms of cost savings - Reduce power losses and consequently carbon emissions in the electrical installation by optimizing equipment locations - Reduce investment cost while using less raw materials by optimizing length and cross-section of cables - Assess the percentage of recyclable materials for cables and busbar trunking systems. Screen Shots Keywords Electrical installation design, power losses assessment, CO2 emissions, quantity of conductors

189

Microsoft Word - DOE-ID-INL-13-006.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-NEPA CX DETERMINATION ID-NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

190

Property:EiaUtilityId | Open Energy Information  

Open Energy Info (EERE)

EiaUtilityId EiaUtilityId Jump to: navigation, search This is a property of type String. Pages using the property "EiaUtilityId" Showing 25 pages using this property. (previous 25) (next 25) 3 3 Phases Energy Services + 21093 + 4 4-County Electric Power Assn + 6641 + A A & N Electric Coop + 84 + A & N Electric Coop (Virginia) + 84 + AEP Generating Company + 343 + AEP Texas Central Company + 3278 + AEP Texas North Company + 20404 + AES Eastern Energy LP + 134 + AGC Division of APG Inc + 261 + AP Holdings LLC + 56571 + AP Holdings LLC (New York) + 56571 + APN Starfirst, L.P. + 50153 + APN Starfirst, L.P. (Illinois) + 50153 + APN Starfirst, L.P. (Ohio) + 50153 + APN Starfirst, L.P. (Texas) + 50153 + APNA Energy + 55841 + ARCO Products Co-Watson + 867 +

191

Intergral Drive Systems AG IDS | Open Energy Information  

Open Energy Info (EERE)

Intergral Drive Systems AG IDS Intergral Drive Systems AG IDS Jump to: navigation, search Name Intergral Drive Systems AG (IDS) Place Zurich, Swaziland Zip CH-8005 Sector Wind energy Product Zurich based producer of power electronics systems for wind turbines, PV plants, and propulsion systems. Coordinates 47.37706°, 8.53955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.37706,"lon":8.53955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

192

Hourly Energy Emission Factors for Electricity Generation in the United  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United Hourly Energy Emission Factors for Electricity Generation in the United States Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. This project utilized GridViewTM, an electric grid dispatch software package, to estimate hourly emission factors for all of the eGRID subregions in the continental United States. These factors took into account electricity imports and exports

193

INCITE Program Doles Out Hours on Supercomputers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers November 5, 2012 - 1:30pm Addthis Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science

194

SEARLE SCHOLARS PROGRAM (http://www.searlescholars.net/go.php?id=23)  

E-Print Network (OSTI)

SEARLE SCHOLARS PROGRAM (http://www.searlescholars.net/go.php?id=23) The University of Pittsburgh at http://www.searlescholars.net/go.php?id=49. The University is invited to submit one nomination

Sibille, Etienne

195

Psychology Insight Taster Day with British Psychology Society (ID:325)  

E-Print Network (OSTI)

Psychology Insight Taster Day with British Psychology Society (ID:325) Outline The `Psychology and Lecturers aim to give a detailed picture of the various work within Psychology and the career/training options available. These are run in conjunction with the Welsh Branch of the British Psychological Society

Harman, Neal.A.

196

Psychology Taster Days in Schools and FE Colleges (ID:317)  

E-Print Network (OSTI)

Psychology Taster Days in Schools and FE Colleges (ID:317) Outline The University's Psychology department brings its students and staff to local schools and colleges to discuss studying psychology Psychology at Higher Education level. A pre-planned programme of events will focus on Psychology as a Science

Harman, Neal.A.

197

2012 -2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2012 - 2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

198

2013 -2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2013 - 2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

199

ORNL 2010-G00976/jcn UT-B ID 200802116  

E-Print Network (OSTI)

ORNL 2010-G00976/jcn UT-B ID 200802116 Detection of Latent Prints by Raman Imaging Technology, allowing the evidence to be visualized. The technology is capable of imaging latent prints on porous and non-porous surfaces, and is especially useful for prints that are low in oil (or "clean") and children

200

https://doyouliveunited.org 1. Enter you user ID  

E-Print Network (OSTI)

Search' button. 7. Enter you search terms for the agency of your choice and click on `Search'. #12;httpshttps://doyouliveunited.org 1. Enter you user ID: your email address Enter your password: welcome be different then the options listed here. 5. For a payroll pledge, enter the amount per pay or the total

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Student ID Number Date of birth Cell Phone  

E-Print Network (OSTI)

Name Student ID Number Date of birth Cell Phone New Housing Student Current Housing Student All's phone Crime 2 Information about charges or crime convicted of Date of conviction Court convicted in Sentence received Probation dates Probation officer's name Probation officer's phone Consent: I authorize

Pantaleone, Jim

202

Usage Codes Observer code Vessel code Trip ID  

E-Print Network (OSTI)

Usage Codes 1 5 2 6 3 7 4 8 Observer code Vessel code Trip ID Permit holder name/address Permit / N MMSI No. Y / N Present? Usage Water capacity (m3): Fuel capacity: m3 / tonnes Other: Other: Kw all that apply & note types of materials for each) Capacity: Usage Incinerator: Net mensuration Y / N

203

UCRL-ID-119170 LAWRENCE LIVERMORE NATIONAL LABORATORY  

E-Print Network (OSTI)

June 1995 UCRL-ID-119170 LAWRENCE LIVERMORE NATIONAL LABORATORY University of California · Livermore, California · 94550 Science on High-Energy Lasers: From Today to the NIF Richard W. Lee, Richard. WorkperformedundertheauspicesoftheU.S.DepartmentofEnergybyLawrenceLivermoreNationalLaboratoryunder Contract W-7405-Eng-48. #12

204

ORNL 2010-G00975/jcn UT-B ID 200802114  

E-Print Network (OSTI)

wastewater recycling ·· Electricity or hydrogen generation ·· Inexpensive ·· Versatile Potential Applications ·· Recycling of wastewater from cellulosic ethanol fermentation ·· Removal of inhibitors of the bioORNL 2010-G00975/jcn UT-B ID 200802114 Microbial Fuel Cells for Recycle of Process Water from

205

ORNL 2010-G00969/jcn UT-B ID 200802060  

E-Print Network (OSTI)

ORNL 2010-G00969/jcn UT-B ID 200802060 Carbon Nanotubes Grown on Various Fibers Technology Summary ORNL researchers invented a method for growing carbon nanotubes on the surfaces of various fiber materials, including quartz, carbon, and activated carbon fibers. These materials may have significant

206

, 1. CONTRACT ID CODE IPAG~ O F PAGES  

E-Print Network (OSTI)

·' , 1. CONTRACT ID CODE IPAG~ O F PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 2 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS# 032987476 l8l DE-AC05-76RL01830 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

207

401(a) Investment Provider Change Form Employee Name Employee ID #  

E-Print Network (OSTI)

401(a) Investment Provider Change Form Employee Name Employee ID # Address City State Zip Code Home to an account in my name with the following Investment Provider(s): Investment Provider Percent Fidelity Investments % TIAA-CREF % The numbers above must be in whole percents only and must total 100%. If you wish

Provancher, William

208

Introduction to Health and Social Care (ID:250)  

E-Print Network (OSTI)

Introduction to Health and Social Care (ID:250) Outline This is a day event which will be designed will be given short talks from different staff about the various health and social care courses on offer details Learning outcomes: · The different health and social care courses offered at Swansea University

Harman, Neal.A.

209

Aquatic Chemistry Course Id: CHEM 605 (3 cr.)  

E-Print Network (OSTI)

Aquatic Chemistry Fall 2010 Course Id: CHEM 605 (3 cr.) Lecture: TR 3:40-5:20pm, REIC 165 of this course is to introduce students to the concepts and models used in aquatic chemistry while providing-base chemistry, complexation, precipitation-dissolution and reduction-oxidation reactions. Student Learning

Wagner, Diane

210

Article ID: Query Translation on the Fly in Deep Web  

E-Print Network (OSTI)

Article ID: Query Translation on the Fly in Deep Web Integration Jiang Fangjiao, Jia Linlin, Meng users to access the desired information, many researches have dedicated to the Deep Web (i.e. Web databases) integration. We focus on query translation which is an important part of the Deep Web integration

211

UGA ID Number Last Name First MI Academic Term THE UNIVERSITY OF GEORGIA  

E-Print Network (OSTI)

UGA ID Number Last Name First MI Academic Term THE UNIVERSITY OF GEORGIA APPLICATION TO MAKE LATE's Office UGA ID Number Last Name First MI Academic Term THE UNIVERSITY OF GEORGIA APPLICATION TO MAKE LATE's Office UGA ID Number Last Name First MI Academic Term THE UNIVERSITY OF GEORGIA APPLICATION TO MAKE LATE

Arnold, Jonathan

212

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module  

E-Print Network (OSTI)

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module and a Frontend of the optimum technology and layout of the tracking detectors for the upgraded ATLAS ID. The goal for the intermediate tracking region in the upgraded ATLAS ID. We anticipate that much of the work would then also

California at Santa Cruz, University of

213

Navy Estimated Average Hourly Load Profile by Month (in MW)  

NLE Websites -- All DOE Office Websites (Extended Search)

Navy Estimated Average Hourly Load Profile by Month (in MW) MONTH HE1 HE2 HE3 HE4 HE5 HE6 HE7 HE8 HE9 HE10 HE11 HE12 HE13 HE14 HE15 HE16 HE17 HE18 HE19 HE20 HE21 HE22 HE23 HE24...

214

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY  

E-Print Network (OSTI)

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY Spring 2011 Instructor: ROBIN COOPER , Ph role of ion channels and transporters in regulation of the membrane potential will be covered in great-neuron communication through electrical and chemical synapses will be examined in live preparations. The historical

Cooper, Robin L.

215

Aegis Combat and Weapon Systems Overview 24 hours, $1495  

E-Print Network (OSTI)

Aegis Combat and Weapon Systems Overview 24 hours, $1495 Launched from the Advanced Surface Missile that led to the initiation of Aegis. Topics Include: · AegisOverviewandHistory · AegisBMD · AegisWeaponSEprocessensuresthatsystemsaredevelopedtomeet affordable, operationally effective, and timely mission objectives. FocusonengineeringtheWeapon

Fork, Richard

216

BRASENOSE COLLEGE 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY  

E-Print Network (OSTI)

BRASENOSE COLLEGE OXFORD 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY FURTHER PARTICULARS in Philosophy at Brasenose College, Oxford. The post is tenable from 1 October 2013 (finishing date: 31st information about the College can be found at www.bnc.ox.ac.uk. Brasenose has a strong tradition in Philosophy

Oxford, University of

217

Folding Proteins at 500 ns/hour with Work Queue  

E-Print Network (OSTI)

in part to the unbiased nature of these simulations: the low-energy regions of the free-energy landscape to achieve an aggregate sampling rate of over 500 ns/hour. As a comparison, a single process typically are oversampled while the (arguably more interesting) high-energy tran- sition regions are rarely observed

Thain, Douglas

218

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network (OSTI)

Center Pool Course Description: Intermediate stroke and swimming skills Prerequisites: Must have by swimming laps during open swim/lap swim at MSU pool. Lap swim times are available online or at the frontCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

219

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network (OSTI)

at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be posted on D2l that you. Emergency phone B. Pool Rules C key swimming skills 1. Breathing 2. Floating/body position 3. Treading waterCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

220

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1. Admin Chg 1, dated 5-10-12, cancels DOE O 322.1C.

2011-01-19T23:59:59.000Z

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I, CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I, CONTRACT ID CODE I, CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM I I ) 8. NAME AND ADDRESS OF CONTRACTOR (No.. street, county, state, ZIP Code) I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. M I 3 8 9A. AMENDMENT OF SOLICITATION NO. extended. 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

222

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I. CONTRA'T ID CODE  

National Nuclear Security Administration (NNSA)

CONTRA'T ID CODE CONTRA'T ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 / Amarillo, TX 79120 I I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENTIMODIFICATION NO. M I 0 8 9A. AMENDMENT OF SOLICITATION NO. DE-AC04-00AL66620 1 1 108. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

223

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I. CONTRA'T ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTRA'T ID CODE CONTRA'T ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 / Amarillo, TX 79120 I I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENTIMODIFICATION NO. M I 0 8 9A. AMENDMENT OF SOLICITATION NO. DE-AC04-00AL66620 1 1 108. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

224

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I ' CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

' ' CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE 1 OF 12 PAGES 9B. DATED (SEE ITEM 11) 5. PROJECT NO. (If applicable) 4. REQUlSlTlONlPURCHASE REQ. NO. 2. AMENDMENTIMODIFICATION NO. MI39 extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

225

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ID PAGE I OF 2  

National Nuclear Security Administration (NNSA)

/ ' / ' ID PAGE I OF 2 PAGES - . Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 2 . AMENDMENTIMODIFICATION NO. MI50 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

226

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

I CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

227

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ID PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

/ ' / ' ID PAGE I OF 2 PAGES - . Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 2 . AMENDMENTIMODIFICATION NO. MI50 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

228

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA SecurID Software Token for Windows DLL Loading Error 3: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

229

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

63: RSA SecurID Software Token for Windows DLL Loading Error 63: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

230

Systems/Circuits Cortical Pitch Regions in Humans Respond Primarily to  

E-Print Network (OSTI)

Systems/Circuits Cortical Pitch Regions in Humans Respond Primarily to Resolved Harmonics and Cognitive Sciences, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139 Pitch of pitch perception havedifferentiatedbetweentemporalandspectralcues

Kanwisher, Nancy

231

AMENDMENT OF SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

SOlLICITATION/MODIFICATlON OF CONTRACT I SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) DE-AC04-00AL66620 I I IOB. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. MI41 9A. AMENDMENT OF Sol-ICITATION NO. CODE I ~ H L I L I I Y L U U ~ I I - 11. THlS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 1. l l is not The above numbered solicitation is amended as set forth in Item 14. The hour and date specified- receipt of Offers is extendec 3. EFFECTIVE DATE See Block 16C . - extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center

232

AMENDMENT OF SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE  

National Nuclear Security Administration (NNSA)

SOlLICITATION/MODIFICATlON OF CONTRACT I SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) DE-AC04-00AL66620 I I IOB. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. MI41 9A. AMENDMENT OF Sol-ICITATION NO. CODE I ~ H L I L I I Y L U U ~ I I - 11. THlS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 1. l l is not The above numbered solicitation is amended as set forth in Item 14. The hour and date specified- receipt of Offers is extendec 3. EFFECTIVE DATE See Block 16C . - extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center

233

Microsoft Word - DOE-ID-INL-12-021.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

234

Microsoft Word - DOE-ID-INL-13-007.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

235

DOE-ID Procurement Services � the action team  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Procurement Services � the action team DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s Procurement Services team. Rapid response Pat Alexander-Johnson (top) and Jeff Fogg (bottom) are two highly-trained and experienced contract specialists with the U.S. Department of Energy's Idaho Operations Office. Within moments of receiving its orders, the 10-member team shifted into

236

Microsoft Word - DOE-ID-INL-12-024..doc  

NLE Websites -- All DOE Office Websites (Extended Search)

PostingNo.: DOE-ID-INL-12-024 PostingNo.: DOE-ID-INL-12-024 SECTION A. Project Title: Rigby Bus Lot Northwest Entrance SECTION B. Project Description: The purpose of the proposed action is to provide an additional bus entrance to the Rigby Park and Ride Bus Lot. A portion of chain link fencing (running east to west) on the northwest corner of the Rigby Park and Ride Bus Lot would be relocated to allow an opening off of the City of Rigby dirt access road so that buses may enter the Rigby Park and Ride Lot from the northwest. The existing fence material would then be placed across the City of Rigby dirt access road (running north and south). The new entrance would be for buses only. Approximately 4 to 6 buses would use this entrance. No personnel vehicles will have access. Buses would start using the new

237

Microsoft Word - DOE-ID-INL-12-018.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

238

File:INL-geothermal-id.pdf | Open Energy Information  

Open Energy Info (EERE)

id.pdf id.pdf Jump to: navigation, search File File history File usage Idaho Geothermal Resources Size of this preview: 380 × 600 pixels. Full resolution ‎(3,458 × 5,456 pixels, file size: 1.67 MB, MIME type: application/pdf) Description Idaho Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Idaho File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:24, 16 December 2010 Thumbnail for version as of 12:24, 16 December 2010 3,458 × 5,456 (1.67 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

239

Microsoft Word - DOE-ID-INL-12-018.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

240

Microsoft Word - DOE-ID-INL-12-021.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Microsoft Word - DOE-ID-INL-12-003.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-12-003 EC Document No.: DOE-ID-INL-12-003 SECTION A. Project Title: Auxiliary Canal Fill Project at Test Reactor Area (TRA)-670 SECTION B. Project Description: Although the ATR canal meets all design basis criteria, lessons learned following the earthquake and tsunami events at the Fukushima- Daiichi Nuclear Power Plant in March of 2011 indicate that an auxiliary water supply to the fuel storage canal with a fill connection located outside of the facility would have been valuable following the beyond design basis event. As a result of these lessons learned, the Department of Energy (DOE) has allocated additional funding to the Idaho National Laboratory (INL) to mitigate beyond design basis events similar to the Fukushima-Daiichi disaster. The Auxiliary Canal Fill Project is one of the projects being funded from this

242

Microsoft Word - DOE-ID-INL-10-020.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

243

Microsoft Word - DOE-ID-INL-13-007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

244

Microsoft Word - DOE-ID-INL-10-017.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-017 DOE-ID-INL-10-017 SECTION A. Project Title: ATR Complex Dial Room. SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Advanced Test Reactor Complex (ATR Complex) (formerly known as the Test Reactor Area [TRA]) in order to meet the U.S. Department of Energy Office of Nuclear Energy programmatic needs and to provide ongoing critical support at the Idaho National Laboratory (INL). The existing telecommunication and data systems located at the ATR Complex need to be updated to ensure the protection and continuity of telecommunications hardware and software property and provide reliability of communications and data connectivity. The new modular dial room facility will replace existing telecommunications systems equipment (telephony, optical transport, and data network infrastructure

245

Microsoft Word - DOE-ID-INL-10-020.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

246

Microsoft Word - DOE-ID-INL-12-016.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No.: DOE-ID-INL-12-016 No.: DOE-ID-INL-12-016 SECTION A. Project Title: Reverse Osmosis System Removal SECTION B. Project Description: The project will remove a reverse osmosis water treatment system (FU-HA-101) from TAN 681 room 182. The system is out-of-service, with no intent of future use. Work will involve removal of the reverse osmosis system, and associated plumbing/piping and electrical lines and conduit. The project will clear the area of obstacles and tripping hazards associated with unused/unnecessary equipment and utilities. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Project activities will result in generation of an estimated 90 cubic ft. of low-level radioactive waste. Wastes will be characterized and dispositioned through Waste Generator Services. Reuse and recycling of materials will be practiced

247

Boeing issues smart ID cards to its employees  

Science Journals Connector (OSTI)

Boeing, one of the worlds leading aerospace companies, is embarking on an ambitious plan to roll out over 200,000 corporate smart ID cards to its staff globally. The project, once implemented, would be one of the worlds largest deployments of such technology by a private corporation. This is a short news story only. Visit www.compseconline.com for the latest computer security news.

2003-01-01T23:59:59.000Z

248

Web: http://dust.ess.uci.edu/prp/prp ids/prp ids.pdf NASA International Polar Year (IPY) Proposal Submitted: April 17, 2006  

E-Print Network (OSTI)

Web: http://dust.ess.uci.edu/prp/prp ids/prp ids.pdf NASA International Polar Year (IPY) Proposal Researchers and Postdocs on CRY- OLIST and on ESS Website. 6. 20070723: Registered for SPAC Workshop for potential collaborators/contributors: 1. Use CVS to obtain source to this proposal: cvs -d :ext:esmf.ess

Zender, Charles

249

ID09969_01_UCA195_3302_030513.raw:1 ID09969_01_UCA195_3302_030513.raw : 1  

E-Print Network (OSTI)

ID09969_01_UCA195_3302_030513.raw:1 ID09969_01_UCA195_3302_030513.raw : 1 INTRODUCTION-UPLC systems and ESI sources. To address these concerns, a prototype 150 um separation device was developed

Richardson, David

250

Red Algae Respond to Waves: Morphological and Mechanical Variation in Mastocarpus papillatus Along  

E-Print Network (OSTI)

Red Algae Respond to Waves: Morphological and Mechanical Variation in Mastocarpus papillatus Along Grove, California, 93950 Abstract. Intertidal algae are exposed to the potentially severe drag forces generated by crashing waves, and several species of brown algae respond, in part, by varying the strength

Denny, Mark

251

Letter Responding to Requests for Information Made by Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responding to Requests for Information Made by Department of Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. Letter Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. Docket No. EO-05-01: This letter responds to requests for information made by Department of Energy (DOE) personnel at our meeting about how to restart Potomac River as quickly as possible after a shutdown. Letter Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

252

20140301-0331_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

2014-04-07T23:59:59.000Z

253

20140601-0630_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

2014-06-30T23:59:59.000Z

254

20140701-0731_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

2014-07-31T23:59:59.000Z

255

20131201-1231_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

2014-01-08T23:59:59.000Z

256

20140201-0228_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

2014-03-03T23:59:59.000Z

257

20140501-0531_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe

2014-06-02T23:59:59.000Z

258

20131101-1130_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

2013-12-02T23:59:59.000Z

259

20130801-0831_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

2013-09-10T23:59:59.000Z

260

20130901-0930_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

Thibedeau, Joe

2013-10-25T23:59:59.000Z

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

20131001-1031_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

2013-11-05T23:59:59.000Z

262

20140101-0131_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

2014-02-03T23:59:59.000Z

263

20130501-20130531_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

2013-06-18T23:59:59.000Z

264

20140201-0228_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

265

20131101-1130_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

266

20140301-0331_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

267

20131001-1031_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

268

20140601-0630_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

269

20131201-1231_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

270

20130801-0831_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

271

20130501-20130531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

272

20140701-0731_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

273

20140101-0131_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

274

20140501-0531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe

275

20130901-0930_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

Thibedeau, Joe

276

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba from NREL Cuba from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

277

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nepal from NREL Nepal from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

278

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Kenya from NREL Kenya from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

279

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

China from NREL China from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

280

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Bangladesh stations from NREL Bangladesh stations from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: RSA SecurID Software Token Converter Unspecified Buffer 0: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability March 8, 2012 - 7:00am Addthis PROBLEM: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability PLATFORM: RSA SecurID Software Token Converter 2.x ABSTRACT: Successful exploitation may allow execution of arbitrary code. reference LINKS: Secunia Advisory SA48297 CVE-2012-0397 IMPACT ASSESSMENT: High Discussion: A vulnerability has been reported in RSA SecurID Software Token Converter, which can be exploited by malicious people to compromise a user's system. Impact: An unspecified error can be exploited to cause a buffer overflow. Solution: Update to version 2.6.1. Addthis Related Articles

282

Implementation of the REAL ID Act | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

recommendations of the 911 Commission, passed the REAL ID Act in an effort to reduce fraud and deter acts of terrorism using fraudulent identification. This Act sets minimum...

283

Annales Geophysicae, 23, 16031610, 2005 SRef-ID: 1432-0576/ag/2005-23-1603  

E-Print Network (OSTI)

Annales Geophysicae, 23, 1603­1610, 2005 SRef-ID: 1432-0576/ag/2005-23-1603 © European Geosciences

Paris-Sud XI, Université de

284

Human Cardiac High-Energy Phosphate Metabolite Concentrationsby ID-Resolved NMR Spectroscopy  

E-Print Network (OSTI)

Human Cardiac High-Energy Phosphate Metabolite Concentrationsby ID-Resolved NMR Spectroscopy Paul A myocytes can contribute no metabolite signal to the observed spectrum, the hypoth- esis

Atalar, Ergin

285

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Honduras from SUNY Honduras from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

286

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Brazil from NREL Brazil from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

287

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nicaragua from SUNY Nicaragua from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

288

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Central America from NREL Central America from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

289

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Guatemala from SUNY Guatemala from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

290

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba sites from SUNY Cuba sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

291

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ghana from NREL Ghana from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

292

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Sri Lanka from NREL Sri Lanka from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

293

A stochastic technique for synthesis of hourly precipitation  

E-Print Network (OSTI)

STATES DURING SIX PFRIODS WHEN THE LAST PERIOD IS DRY t-5 t-4 State t-3 During T 11M t-2 t-1 D D D D W W W W D D W W D D W W D W D W D W D W D W D W D W D W 19 fearures and of the daily precipitation record of the... 124 10 80 TABLE 5 FREQUENCIES OF 2-HR SEQUENCES State During Hour (t) 1 2 3 4 5 6 7 8 9 10 136, 330 338 311 198 171 138 65 38 52 30 2 3 416 220 142 68 30 380 170 189 102 50 21 7 6 42 8 7 4 3 9 2 4 0 5 Zl 7 4J 9 209 146 112 29...

Huddle, John Paul

2012-06-07T23:59:59.000Z

294

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

El Salvador sites from SUNY El Salvador sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

295

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ethiopia from NREL Ethiopia from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

296

AeroSys, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Respondent Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 20 l 1-SCE-1624 By authority of the Secretary, U.S. Department of Energy: I . In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE») and AeroSys, Inc. {"Respondent"). The Compromise Agreement resolves the case initiated to pmsue a civil penalty for violations of DOE regulatory requirements at 10 C.F.R. §§ 429.12, 429.16, and 430.32(c). 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

297

Education of First Responders at Yale | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Education of First Responders at Yale Education of First Responders at Yale Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Spinoff Applications Spinoff Archives SBIR/STTR Applications of Nuclear Science and Technology Funding Opportunities Nuclear Science Advisory Committee (NSAC) News & Resources Contact Information Nuclear Physics U.S. Department of Energy SC-26/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3613 F: (301) 903-3833 E: sc.np@science.doe.gov More Information » Spinoff Archives Education of First Responders at Yale Print Text Size: A A A RSS Feeds FeedbackShare Page Application/instrumentation: Course on Basic Radiation Physics for First Responders Developed at: Yale University/Wright Nuclear Structure Laboratory

298

HumanWildlife Conflicts 2(2):194199, Fall 2008 How people should respond when  

E-Print Network (OSTI)

into camp, most respondents said that a person should aggressively encourage the bear to leave and to fight century occurred less frequently, at a rate of about 0.6 attacks per year, than did bear attacks (Torres

299

A location model for storage of emergency supplies to respond to technological accidents in Bogot  

Science Journals Connector (OSTI)

The Prevention and Attention of Emergencies Fund (FOPAE) of Bogot currently counts with one warehouse where physical equipment and supplies are stored to respond to different types of emergencies, including technological incidents. The transfer ...

Ridley S. Morales Mahecha; Raha Akhavan-Tabatabaei

2012-12-01T23:59:59.000Z

300

Operation of a Wideband Terahertz Superconducting Bolometer Responding to Quantum Cascade Laser Pulses  

Science Journals Connector (OSTI)

We make use of a niobium film to produce a micrometric vacuum-bridge superconducting bolometer responding to THz frequency. The bolometer works anywhere in the temperature range 27K, which can be easily reached...

S. Cibella; M. Beck; P. Carelli; M. G. Castellano

2012-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

More money, more science? : how the malaria research community responds to funding opportunities  

E-Print Network (OSTI)

Agencies that fund research shape both the rate and direction of scientific progress through the resource allocation choices they make. However, our understanding of the degree to which scientists respond to shifts in that ...

Krestin, Ruth Viviane

2010-01-01T23:59:59.000Z

302

Institute of Development Studies (IDS) | Open Energy Information  

Open Energy Info (EERE)

Institute of Development Studies (IDS) Institute of Development Studies (IDS) Jump to: navigation, search Logo: Institute of Development Studies Name Institute of Development Studies Address Library Road, Brighton, East Sussex Place Brighton, UK Zip BN1 9RE Number of employees 201-500 Year founded 1966 Phone number +44 (0)1273 606261 Coordinates 50.8659583°, -0.0901136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8659583,"lon":-0.0901136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

303

Last Revision Date: 8/16/2010 Last Merged Filing ID:  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision Date: 8/16/2010 Last Merged Filing ID: Revision Date: 8/16/2010 Last Merged Filing ID: Tariffs, Rate Schedules, and Other Tariff Documents Southwestern Power Administration Tariffs, Rate Schedules, and Other Tariff Documents Document Generated On: 10/1/2010 Contents TABLE OF CONTENTS ....................................................................................................................................1 PREAMBLE: AUTHORITIES AND OBLIGATIONS .............................................................................................1

304

UNCORRECTEDPROOF SPB-190570 Chapter ID 19 August 4, 2010 Time: 01:07pm Proof 1  

E-Print Network (OSTI)

UNCORRECTEDPROOF SPB-190570 Chapter ID 19 August 4, 2010 Time: 01:07pm Proof 1 01 02 03 04 05 06 07, LLC 2011 #12;UNCORRECTEDPROOF SPB-190570 Chapter ID 19 August 4, 2010 Time: 01:07pm Proof 1 46 47 48. Most studies supporting the DOHaD hypoth- esis are primarily nutritional in nature, thus the potential

Blumberg, Bruce

305

The visualization of data and the user-interface in the Auto-ID World  

E-Print Network (OSTI)

This thesis proposes a framework for user interface (UI) design in the Auto-ID world. The thesis includes the examination of issues related to visualizing data to the user from a top-down perspective in the Auto-ID World. ...

Chandrasekhar, Chaitra

2005-01-01T23:59:59.000Z

306

Liberty Alliance Project: Version: 1.0 Liberty ID-WSF Security and Privacy  

E-Print Network (OSTI)

Liberty Alliance Project: Version: 1.0 Liberty ID-WSF Security and Privacy OverviewVersion: 1-idwsf-security-privacy-overview-v1.0.pdf Liberty Alliance Project 1 #12;Liberty Alliance Project: Version: 1.0 Liberty ID Alliance. Permission is hereby granted to11 use the document solely for the purpose of implementing

Landau, Susan

307

GRR/Section 3-ID-d - Land Use Permit | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit d - Land Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-d - Land Use Permit 03-ID-d - Land Use Permit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Triggers None specified Click "Edit With Form" above to add content 03-ID-d - Land Use Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands issues Land Use Permits for non-invasive exploration on a case by case basis. 3-ID-d.1 to 3-ID-d.2 - Will Non-Invasive Exploration Be Preformed on State Lands? A Land Use Permit is required to preform non-invasive exploration on state

308

Finding Utility Companies Under a Given Utility ID | OpenEI Community  

Open Energy Info (EERE)

Finding Utility Companies Under a Given Utility ID Finding Utility Companies Under a Given Utility ID Home > Groups > Developer Jayhuggins's picture Submitted by Jayhuggins(15) Member 22 June, 2012 - 09:39 Utility+Utility Access Map Here's a quick way to find all the utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: [[Category:Utility Companies]][[EiaUtilityId::15248]] substituting your utility id of interest for 15248, and click "Find results". Groups: Developer Login to post comments Jayhuggins's blog Latest blog posts Rmckeel The utility rate database version 1 API is now deprecated Posted: 6 Sep 2013 - 14:00 by Rmckeel Jweers New Robust References! Posted: 7 Aug 2013 - 18:23 by Jweers 1 comment(s) 1 of 10 ›› Groups Menu You must login in order to post into this group.

309

T-642: RSA SecurID update to Customers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: RSA SecurID update to Customers 2: RSA SecurID update to Customers T-642: RSA SecurID update to Customers June 9, 2011 - 12:45am Addthis PROBLEM: Certain characteristics of the attack on RSA indicated that the perpetrator's most likely motive was to obtain an element of security information that could be used to target defense secrets and related IP, rather than financial gain, PII, or public embarrassment. PLATFORM: RSA SecurID implementations ABSTRACT: RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products. reference LINKS: Open Letter to RSA Customers (update) CVE-2011-0322 RSA Fraud Resource Center RSA Security Practice DOE-CIRC T-640: RSA Access Manager Server CVE-2011-0322 Update

310

Retrieval of hourly records of surface hydrometeorological variables using satellite remote sensing data  

Science Journals Connector (OSTI)

A new algorithm is formulated for retrieving hourly time-series of surface hydrometeorological variables including net radiation, sensible heat flux, and near-surface air temperature aided by hourly visible images from the Geostationary ...

Sanaz Moghim; Andrew Jay Bowen; Sepideh Sarachi; Jingfeng Wang

311

EPA ENERGY STAR Webcast: Portfolio Manager Office Hours, Focus Topic: Sharing Forward and Transfer Ownership  

Energy.gov (U.S. Department of Energy (DOE))

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

312

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to  

E-Print Network (OSTI)

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to: _________________________________ Class Time: __________ - __________ _________ Test Date: _______________________________ Time allotted): ____________________________ INSTRUCTOR PROCEDURES: 1. Please deliver tests to WYLY TOWER 318 at least 24 hours PRIOR to test time

Selmic, Sandra

313

Insights from Smart Meters: The Potential for Peak-Hour Savings from Behavior-Based Programs  

E-Print Network (OSTI)

top graph) as a percent of the total average energy usage ofgraph) as a percentage of each hours average energy usagegraph: first, kWh savings; second, normalized savings as a percent of the total average energy usage

Todd, Annika

2014-01-01T23:59:59.000Z

314

EPA ENERGY STAR Webcast- Portfolio Manager Office Hours, Focus Topic: Weather Data and Metrics  

Energy.gov (U.S. Department of Energy (DOE))

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

315

Fuel Cell Stacks Still Going Strong After 5,000 Hours | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Stacks Still Going Strong After 5,000 Hours Fuel Cell Stacks Still Going Strong After 5,000 Hours March 24, 2009 - 1:00pm Addthis Washington, DC -- Two fuel cell stacks...

316

Id-1 gene and gene products as therapeutic targets for treatment of breast cancer and other types of carcinoma  

DOE Patents (OSTI)

A method for treatment of breast cancer and other types of cancer. The method comprises targeting and modulating Id-1 gene expression, if any, for the Id-1 gene, or gene products in breast or other epithelial cancers in a patient by delivering products that modulate Id-1 gene expression. When expressed, Id-1 gene is a prognostic indicator that cancer cells are invasive and metastatic.

Desprez, Pierre-Yves; Campisi, Judith

2014-08-19T23:59:59.000Z

317

Minor in Psychology The minor in Psychology requires 18 hours of Psychology coursework as shown below. At least 6 hours of the  

E-Print Network (OSTI)

Minor in Psychology The minor in Psychology requires 18 hours of Psychology coursework as shown on this minor check sheet may be counted toward the Psychology minor. Research Methods/Critical Thinking Skills 1 PSYC Course - 3 hours Term Grade Hrs Qpts General Psychology Lecture (PSYC 1101) with a C

Raja, Anita

318

Microsoft Word - DOE-ID_INL-13-010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: North Boulevard Annex Lease Termination SECTION B. Project Description: The proposed activity would terminate the current lease of the North Boulevard Annex (IF-613) at 2095 North Boulevard in Idaho Falls, ID on or about July 31, 2013 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur prior to the lease termination to ensure the facility is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,000.00. SECTION C. Environmental Aspects or Potential Sources of Impact: Generating and Managing Waste: Various quantities of industrial waste (non-hazardous, non-radioactive) such as office trash are removed from the building for pickup and transportation by garbage collection services prior to lease termination.

319

Microsoft Word - DOE-ID-INL-13-019.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 SECTION A. Project Title: University Boulevard Water Meter Installation SECTION B. Project Description: This project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-681 (UB2), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, ID during the projected time period of August and September, 2013 at an approximate cost of $20 K - $95 K depending upon whether the work can be completed from inside the building(s) or must be performed exterior to the building(s). SECTION C. Environmental Aspects or Potential Sources of Impact: Air Emissions: If excavation is required, the activity has the potential to generate fugitive dust. All reasonable precautions shall be

320

Microsoft Word - DOE-ID-INL-13-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 CX Posting No.: DOE-ID-INL-13-012 SECTION A. Project Title: Water Security Test Bed (WSTB) SECTION B. Project Description: This project was extensively described in Environmental Checklists (ECs) Idaho National Laboratory (INL)-13-014 (Overarching [OA] 5) and INL-13-014 Revision (R) 1 (OA 5). Upon review, it was determined that additional planning and detail was required to fully describe the project and associated activities. Both INL-13-014 and R1 to that EC are canceled; this EC will replace them. Future revisions may address additional project details regarding design, construction, and operational details and limitations as they become known through the project planning process. Background Since its inception, the Environmental Protection Agency's (EPA) Homeland Security Research Program (Sponsor) has been providing

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - DOE-ID-INL-13-006.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

322

Microsoft Word - DOE-ID-INL-12-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

323

IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

NLE Websites -- All DOE Office Websites (Extended Search)

6/2004 13:39 FAX 6/2004 13:39 FAX IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 26 2004 OFFICE OF AIR AND RADIATION R. Paul Detwiler, Acting Manager Carlsbad Field Office U.S. Department of Energy P.O. Box 3090 Carlsbad, NM 88221-3090 Dear Dr. Detwiler: This letter announces the U.S. Environmental Protection Agency's (EPA's) final decision to approve the Department of Energy's (DOE's) remote handled (RH) transuranic (TRU) Waste Characterization Program Implementation Plan (WCPIP), Revision aD, and the RH TRU Waste Characterization Plan for the Waste Isolation Pilot Plant (WIPP). We have detenDined that these documents provide an adeql.late general framework for the characterization ofRH waste for disposal at WIPP, while allowing flexibility for DOE to develop characterization programs

324

Microsoft Word - DOE-ID-INL-13-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho National Laboratory Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-13-022 SECTION A. Project Title: Global Threat Reduction Initiative (GTRI) Irradiated Experiment Shipping Capability SECTION B. Project Description: The General Electric (GE) 2000 Model Cask is currently used to support the Global Threat Reduction Initiative (GTRI) irradiated experiment shipments from the Advanced Test Reactor (ATR) at Idaho National Laboratory's (INL) ATR Complex to the Hot Fuel Examination Facility (HFEF) at INL's Materials and Fuels Complex (MFC). However, due to changes in GE-Hitachi's business model, the continued availability of the GE Model 2000 cask is not guaranteed. Furthermore, the internal cavity of the GE Model 2000 cask is too short to support shipment of some larger GTRI experiments. The purpose of the proposed action is to develop and implement a

325

Microsoft Word - DOE-ID-INL-12-023.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

326

Microsoft Word - DOE-ID-INL-12-006.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: International Way Office Building Lease Termination SECTION B. Project Description: The proposed activity will terminate the current lease of the International Way Office Building (IF-674, IWB) at 1690 International Way in Idaho Falls, ID on or about March 28, 2012 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur on or about March 26 to ensure the building is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Small amounts of industrial waste (non-hazardous, non-radioactive) such as office trash are

327

Microsoft Word - DOE-ID-INL-12-022.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

328

Microsoft Word - DOE-ID-INL-13-008.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

329

Microsoft Word - DOE-ID-INL-13-008.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

330

Material Safety Data Sheet MSDS ID NO.: 0137SPE012  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Material Safety Data Sheet Material Safety Data Sheet MSDS ID NO.: 0137SPE012 Revision date: 05/25/2011 1. CHEMICAL PRODUCT AND COMPANY INFORMATION Product name: Speedway E85 Synonym: Speedway ED75/ED85; E-75; E75; E-85; E85; Ethanol/Gasoline Fuel Blend; Fuel Ethanol ED75/ED85 Chemical Family: Gasoline/Ethanol Formula: Mixture Manufacturer: Speedway LLC P.O. Box 1500 Enon, OH 45501 Other information: 419-421-3070 Emergency telephone number: 877-627-5463 2. COMPOSITION/INFORMATION ON INGREDIENTS E85 is a mixture of ethyl alcohol and gasoline that is approved for use in an automobile spark ignition engine. Can contain small amounts of dye and other additives (>0.02%) which are not considered hazardous at the concentrations used. Product information: Name CAS Number

331

Microsoft Word - DOE-ID-INL-12-023.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

332

POST-DOCTORAL FELLOWSHIP IN HIGH ENERGY THEORY GROUP The BNL job link for BNL JOB ID#15942 is  

E-Print Network (OSTI)

POST-DOCTORAL FELLOWSHIP IN HIGH ENERGY THEORY GROUP The BNL job link for BNL JOB ID#15942 is" within the dropdown box -Click on Job ID #15942, "Research Associate, High Energy Theory (6482)" After: https://jobs.bnl.gov/psc/Jobs/EMPLOYEE/HRMS/c/HRS_HRAM.HRS_CE.GBL The description of BNL Job ID #15942

Johnson, Peter D.

333

Leer, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Leer, Inc. Leer, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5325 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Leer, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations ofthe compliance certification requirements located at 10 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the tenus of the Compromise Agreement and evaluating the facts

334

USA Manufacturing Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USA Manufacturing USA Manufacturing Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5336 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department ofEnet'gy ("DOE") and USA Manufacturing ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.P.R.§§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

335

Southeast Cooler Corp. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southeast Cooler Corp. Southeast Cooler Corp. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5331 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Southeast Cooler Corp. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.P.R.§§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

336

Kold Pacl,, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kold Pacl,, Inc. Kold Pacl,, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5323 By the General Counsel, U.S. Depatiment of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Kold Pack, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

337

Jamison Door Company Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jamison Door Company Jamison Door Company Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5348 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Jamison Door Company ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

338

Mueller Streamline Co., Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2011-SW-2802 December 1, 2011 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Mueller Streamline Co. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of Federal water conservation requirements at 10 C.F.R. § 430.32(o) and 42 U.S.C. § 6295(j). 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the

339

Amerisink, Inc., Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2010-CW-0710 Issued: September 28, 2010 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Amerisink, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements at 10 C.F.R. § 430.62. 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the

340

Central Moloney, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Central Moloney, Inc. Central Moloney, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-SE-4702 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Central Moloney, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for distribution in commerce in the U.S. of basic models of a covered product that failed to meet the energy conservation requirements as described at 10 C.F.R. § 431.196. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Commercial Cooler, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Cooler, Inc. Commercial Cooler, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5343 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Commercial Cooler, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at I 0 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

342

Nearly 3,000 Emergency Responders Receive EM Training | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,000 Emergency Responders Receive EM Training 3,000 Emergency Responders Receive EM Training Nearly 3,000 Emergency Responders Receive EM Training February 26, 2013 - 12:00pm Addthis In a mock scenario, firefighters work with an accident victim during a Transportation Emergency Preparedness Program full field exercise In a mock scenario, firefighters work with an accident victim during a Transportation Emergency Preparedness Program full field exercise Students learn to identify labels and use instruments during a Transportation Emergency Preparedness Program class Students learn to identify labels and use instruments during a Transportation Emergency Preparedness Program class In a mock scenario, firefighters work with an accident victim during a Transportation Emergency Preparedness Program full field exercise

343

Two New Studies Show How Energy Consumers Respond to Smart Grid Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Studies Show How Energy Consumers Respond to Smart Grid New Studies Show How Energy Consumers Respond to Smart Grid Technology Two New Studies Show How Energy Consumers Respond to Smart Grid Technology February 14, 2011 - 3:24pm Addthis Home-energy display mobile phone application that shows how much energy an appliance is consuming. | Photo courtesy of Pecan Street Project. Home-energy display mobile phone application that shows how much energy an appliance is consuming. | Photo courtesy of Pecan Street Project. Matt Grosso Program Analyst, Office of Electricity Delivery & Energy Reliability What does this mean for me? Home smart grid technologies can help consumers save money -- and they use them to save money. Customers are willing to change the way they use electricity in response to home smart grid systems and dynamic pricing programs that save

344

Navien America, Inc., Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Navien America, Inc., Navien America, Inc., Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2010-CE-1712 Issued: September 20, 2010 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE'') and Navien, America, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements at 10 C.P.R. § 430.62. 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and ·incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

345

Dade Engineering Corp. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dade Engineering Corp. Dade Engineering Corp. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5316 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Dade Engineering Corp. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at I 0 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

346

Ingersoll-Rand Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ingersoll-Rand Ingersoll-Rand Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY Washington, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2012-SE-1608 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Ingersoll-Rand ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for distribution in commerce of units of a basic model of covered product that fail to meet the energy conservation requirements located at 10 C.F.R. § 430.32( c ). 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated

347

Data for First Responder Use of Photoionization Detectors for Vapor Chemical Constituents  

SciTech Connect

First responders need appropriate measurement technologies for evaluating incident scenes. This report provides information about photoionization detectors (PIDs), obtained from manufacturers and independent laboratory tests, and the use of PIDs by first responders, obtained from incident commanders in the United States and Canada. PIDs are valued for their relatively low cost, light weight, rapid detection response, and ease of use. However, it is clear that further efforts are needed to provide suitable instruments and decision tools to incident commanders and first responders for assessing potential hazardous chemical releases. Information provided in this report indicates that PIDs should always be part of a decision-making context in which other qualitative and more definitive tests and instruments are used to confirm a finding. Possible amelioratory actions ranging from quick and relatively easy fixes to those requiring significant additional effort are outlined in the report.

Keith A. Daum; Matthew G. Watrous; M. Dean Neptune; Daniel I. Michael; Kevin J. Hull; Joseph D. Evans

2006-11-01T23:59:59.000Z

348

Amerikooler, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amerikooler, Inc. Amerikooler, Inc. Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5307 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Amerikooler, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

349

Custom Coolers, LLC Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Custom Coolers, LLC Custom Coolers, LLC Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2013-CE-5315 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Custom Coolers, LLC ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations ofthe compliance certification requirements located at 10 C.F.R. §§ 429.12 and 429.53. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

350

Question of the Week: How Are You Observing Earth Hour? | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Observing Earth Hour? Are You Observing Earth Hour? Question of the Week: How Are You Observing Earth Hour? March 26, 2009 - 12:16pm Addthis This Saturday, March 28th, people around the world will observe Earth Hour at 8:30 p.m. local time-whatever the local time zone happens to be-by switching off their lights for one hour. While many people are taking part by simply shutting off their lights and lighting some candles, some communities are hosting gatherings or events around Earth Hour. How are you observing Earth Hour? Each Thursday, you have the chance to share your thoughts on a topic related to energy efficiency or renewable energy for consumers. Please e-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Question of the Week: How Will You Save Energy this Spring?

351

A short Id2 protein fragment containing the nuclear export signal forms amyloid-like fibrils  

SciTech Connect

The negative regulator of DNA-binding/cell-differentiation Id2 is a small protein containing a central helix-loop-helix (HLH) motif and a C-terminal nuclear export signal (NES). Whereas the former is essential for Id2 dimerization and nuclear localization, the latter is responsible for the transport of Id2 from the nucleus to the cytoplasm. Whereas the isolated Id2 HLH motif is highly helical, large C-terminal Id2 fragments including the NES sequence are either unordered or aggregation-prone. To study the conformational properties of the isolated NES region, we synthesized the Id2 segment 103-124. The latter was insoluble in water and only temporarily soluble in water/alcohol mixtures, where it formed quickly precipitating {beta}-sheets. Introduction of a positively charged N-terminal tail prevented aggressive precipitation and led to aggregates consisting of long fibrils that bound thioflavin T. These results show an interesting structural aspect of the Id2 NES region, which might be of significance for both protein folding and function.

Colombo, Noemi [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany); Schroeder, Josef [Institut fuer Pathologie, Zentrales EM-Labor, Fakultaet fuer Medizin, Universitaet Regensburg, Franz-Josef-Strauss-Allee 11, 93053 Regensburg (Germany); Cabrele, Chiara [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany)]. E-mail: chiara.cabrele@chemie.uni-regensburg.de

2006-07-21T23:59:59.000Z

352

How to respond to data requests in Portfolio Manager | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

to respond to data requests in Portfolio Manager to respond to data requests in Portfolio Manager Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

353

Anticipates and Responds to System Disturbances (Self-Heals) | Open Energy  

Open Energy Info (EERE)

Anticipates and Responds to System Disturbances (Self-Heals) Anticipates and Responds to System Disturbances (Self-Heals) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Anticipates and Responds to System Disturbances (Self-Heals) Focus Area: Crosscutting Topics: Policy Impacts Website: www.netl.doe.gov/smartgrid/referenceshelf/whitepapers/09.02.2010_Antic Equivalent URI: cleanenergysolutions.org/content/anticipates-and-responds-system-distu Language: English Policies: "Deployment Programs,Financial Incentives,Regulations" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Public-Private Partnerships Regulations: "Cost Recovery/Allocation,Resource Integration Planning" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

354

FUTURE FORCE AND FIRST RESPONDERS: BUILDING TIES FOR COLLABORATION AND LEVERAGED RESEARCH AND DEVELOPMENT  

E-Print Network (OSTI)

32611-6120 ABSTRACT Visions for the information needs and operational capabilities of the Future Force are similar to those for First Responders who comprise the backbone of Homeland Security personnel in response to both domestic incidents and internationally through peacekeeping and related operational roles

Hammer, Joachim

355

MOVEMENT AND SPEED OF DOLPHIN SCHOOLS RESPONDING TO AN APPROACHING SHIP  

E-Print Network (OSTI)

the ship. The effect of this behavior on shipboard censusing of dolphins is discussed. In the eastern trajectories around an approaching ship and to evaluate the effect on shipboard censusing of dolphinsMOVEMENT AND SPEED OF DOLPHIN SCHOOLS RESPONDING TO AN APPROACHING SHIP D. Au AND W. PERRYMANl

356

Guide on Preventing and Responding to All Forms of Violence in the Workplace  

Directives, Delegations, and Requirements

To ensure all sites have the tools to implement processes, we have created this guide. Each site is expected to develop its own site specific set of procedures/process to implement DOE Policy 444.1 Preventing and Responding to all forms of violence in the Workplace.

2014-10-21T23:59:59.000Z

357

Responding to the Unexpected: Traffic Research in the Wake of Bridge Collapse  

E-Print Network (OSTI)

effects of the I-35W Mississippi River bridge collapse (under review) · He, X.Z., S. E., Jabari and H. LiuResponding to the Unexpected: Traffic Research in the Wake of Bridge Collapse Henry Liu, Ph@umn.edu Nov. 20, 2007 #12;Planning for the Expected: Traffic Research after Bridge Reopening & Preliminary

Levinson, David M.

358

Responding to the Unexpected: Traffic Research in the Wake of Bridge Collapseg p  

E-Print Network (OSTI)

;#12;#12;#12;#12;#12;T ffi R h Q tiTraffic Research Questions · Natural Experimentation Site · Bridge Collapse / ReopenResponding to the Unexpected: Traffic Research in the Wake of Bridge Collapseg p Henry Liu, Ph of the Mississippi River Bridge Collapse #12;Freeway Traffic VolumeFreeway Traffic Volume #12;Congestion Impacts

Levinson, David M.

359

Course Secretary: Angi Johnson, 0114 2227022, a.m.johnson1@sheffield Writing and Responding  

E-Print Network (OSTI)

Course Secretary: Angi Johnson, 0114 2227022, a.m.johnson1@sheffield Writing and Responding Level://www.shef.ac.uk/library/services/taught.html #12;Course Secretary: Angi Johnson, 0114 2227022, a.m.johnson1@sheffield Journeys: Travel Writing

Stevenson, Mark

360

How avian nest site selection responds to predation risk: testing an `adaptive peak hypothesis'  

E-Print Network (OSTI)

How avian nest site selection responds to predation risk: testing an `adaptive peak hypothesis., Arcata, CA 95521, USA Summary 1. Nest predation limits avian fitness, so birds should favour nest sites that minimize predation risk. Nevertheless, preferred nest microhabitat features are often uncorrelated

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Bachelor of Science in Biology (BSB) Checksheet: 126 hours Department of Biology, Georgia Southern University  

E-Print Network (OSTI)

), GEOL 1110 - Earth Lab (1) Evolution & Ecology Elective (3-4 hrs) (Level 3000 and above) Area D2 Elective (3-4 hrs) (Level 3000 and above) Area D3: Math, Science or Technology Elect. (3-4 hrs) MATH 1441 University Name: Starting Date: Eagle ID: Curriculum: Term Gr Term Gr Area A: Essential Skills (9 hrs)** Area

Hutcheon, James M.

362

Bachelor of Arts in Biology (BA) Checksheet: 126 hours Department of Biology, Georgia Southern University  

E-Print Network (OSTI)

), GEOL 1110 - Earth Lab (1) Evolution & Ecology Elective (3-4 hrs) (Level 3000 and above) Area D2 Elective (3-4 hrs) (Level 3000 and above) Area D3: Math, Science or Technology Elect. (3-4 hrs) MATH 1441 University Name: Starting Date: Eagle ID: Curriculum: Term Gr Term Gr Area A: Essential Skills (9 hrs)** Area

Hutcheon, James M.

363

GRR/Section 6-ID-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-ID-b - Construction Storm Water Permit 6-ID-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-b - Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 06IDBConstructionStormwaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 6-ID-b.1 - EPA Construction General Permit Idaho does not have authority from the United States Environmental Protection Agency to issue a construction storm water permit. See Flowchart

364

GRR/Section 1-ID-a - Land Use Considerations | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 1-ID-a - Land Use Considerations GRR/Section 1-ID-a - Land Use Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 1-ID-a - Land Use Considerations 01IDALandUseConsiderations.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 01IDALandUseConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Add Text Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_1-ID-a_-_Land_Use_Considerations&oldid=685536" Categories: Regulatory Roadmap State Sections Geothermal Regulatory Roadmap Sections

365

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

on Docket ID: DOE-HQ-2011-0014 on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

366

GRR/Section 4-ID-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

4-ID-a - State Exploration Process 4-ID-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-ID-a - State Exploration Process 04IDAStateExplorationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Triggers None specified Click "Edit With Form" above to add content 04IDAStateExplorationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 4-ID-a.1 - Has the Environmental Process been Completed for Exploration? If an EA/EIS has not yet been completed for this portion of the project, the developer must first complete the applicable environmental process.

367

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

368

GRR/Section 8-ID-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

8-ID-a - State Transmission 8-ID-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-ID-a - State Transmission 08IDAStateTransmission.pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies IC §67-6508: Local Land Use Planning Duties IC §61-526: Certificate of Public Convenience and Necessity Triggers None specified Click "Edit With Form" above to add content 08IDAStateTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-ID-a.1 - Will the Transmission Project Be Undertaken by a Public Utility?

369

COMPUTER SCIENCE AND ENGINEERING TRAVEL REIMBURSEMENT FORM Empl ID Name: Email  

E-Print Network (OSTI)

COMPUTER SCIENCE AND ENGINEERING TRAVEL REIMBURSEMENT FORM Empl ID Name: Email Address City Programming Languages Databases Robotics & Artificial Intelligence Education Software Engineering and GIS Systems and Security Presenting a paper or poster at this conference which acknowledges the sponsored

Minnesota, University of

370

Product traceability in the pharmaceutical supply chain : an analysis of the auto-ID approach  

E-Print Network (OSTI)

This thesis analyzes how the Auto-ID technology and information infrastructure will change the management and distribution of pharmaceutical products within the health care industry by enabling item level product traceability ...

Bellman, Attilio, 1967-

2003-01-01T23:59:59.000Z

371

Annales Geophysicae (2004) 22: 35833588 SRef-ID: 1432-0576/ag/2004-22-3583  

E-Print Network (OSTI)

Annales Geophysicae (2004) 22: 3583­3588 SRef-ID: 1432-0576/ag/2004-22-3583 © European Geosciences, and the equinoctial hypoth- esis in which the orientation of the Earth's axis of rotation relative to the Earth

Paris-Sud XI, Université de

372

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network (OSTI)

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

373

Microsoft PowerPoint - ID 876 TourBooklet_revb_Geology [Compatibility...  

Office of Environmental Management (EM)

Bob Andrews Navarro-Intera December 10, 2014 Nevada National Security Site Underground Test Area (UGTA) Tour Page 2 Page 2Title ID 876 Tour Booklet 12102014 - Page 2 Log No....

374

Microsoft Word - 2013 (05-22-13) DOE-ID Operations Summary-13...  

NLE Websites -- All DOE Office Websites (Extended Search)

a discrepancy and lack of isolation of power supply in the starter cabinet. Equipment lockout and tagout was performed, and work was stopped immediately. NE-ID--BEA-ATR-2013-0011...

375

*Name: Date of Birth: Banner/Student ID # Social Security # Phone: Cell  

E-Print Network (OSTI)

Transmitted Infection Anemia Eye Disease (excluding glasses) Joint Disease/Injury Sickle Cell Trait*Name: Date of Birth: Banner/Student ID # Social Security # Phone: Cell Permanent Address: Home Age, contact: Name Relationship: Phone: Day____________________ Eve____________________ Cell

Gering, Jon C.

376

High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 4)  

DOE Data Explorer (OSTI)

This is the first of five exposures of the same sample at different tilts. This one is at +0 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

Nelson, Johanna

377

High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 7)  

DOE Data Explorer (OSTI)

This is the fourth of five exposures of the same sample at different tilts. This one is at -15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

Nelson, Johanna

378

High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 8)  

DOE Data Explorer (OSTI)

This is the fifth of five exposures of the same sample at different tilts. This one is at -30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

Nelson, Johanna

379

High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 5)  

DOE Data Explorer (OSTI)

This is the second of five exposures of the same sample at different tilts. This one is at +15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

Nelson, Johanna

380

High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 6)  

DOE Data Explorer (OSTI)

This is the third of five exposures of the same sample at different tilts. This one is at +30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

Nelson, Johanna

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GrIDS A GRAPH BASED INTRUSION DETECTION SYSTEM FOR LARGE NETWORKS  

E-Print Network (OSTI)

or groups of hosts. By analyzing the characteristics of the activity graphs, GrIDS detects and reports under contract DOD DABT 63-93-C-0045. intra-networks intranets to share and disseminate internal

California at Davis, University of

382

J Forensic Sci, July 2004, Vol. 49, No. 4 Paper ID JFS2003303  

E-Print Network (OSTI)

J Forensic Sci, July 2004, Vol. 49, No. 4 Paper ID JFS2003303 Available online at: www. KEYWORDS: forensic science, Y-chromosome, single nucleotide polymorphism, SNP typing, Y-SNPs, SNa

383

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

384

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

385

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLY AT FACILITIES LISTED  

E-Print Network (OSTI)

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLYSp_aquatic.pdf Perinton http://www.perinton.org/Departments/Recreation/PCC Pittsford Pages 1012 http

Portman, Douglas

386

Intra-hour wind power variability assessment using the conditional range metric : quantification, forecasting and applications.  

E-Print Network (OSTI)

??The research presented herein concentrates on the quantification, assessment and forecasting of intra-hour wind power variability. Wind power is intrinsically variable and, due to the (more)

Boutsika, Thekla

2013-01-01T23:59:59.000Z

387

E-Print Network 3.0 - after-hours care instructions Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

after hours access? yes no AUP Number... Supervisor's Signature Submitted Occupational Health Form to Animal Care and Use 608 Boyd Graduate Studied... Building ... Source:...

388

Microsoft Word - DOE-ID-INL-13-005.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Land Mobile Radio - Bi Directional Amplifier (BDA) Installation SECTION B. Project Description The INL has contracted with White Cloud Communications to provide Land Mobile Radio Services for emergency first responders under a managed service contract. The contract includes provisions for area coverage and quality of service. Testing of the installed Radio Frequency backbone system revealed that certain buildings at the INL do not have adequate coverage. The engineered solution to remedy this service deficiency is to install Bi-Directional Amplifiers (BDAs) in the deficient areas. A typical BDA installation includes an outside antenna connected by cabling to an inside repeater which amplifies the signal. The installation process is typical for electrical

389

Microsoft Word - DOE-ID-INL-13-005.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Land Mobile Radio - Bi Directional Amplifier (BDA) Installation SECTION B. Project Description The INL has contracted with White Cloud Communications to provide Land Mobile Radio Services for emergency first responders under a managed service contract. The contract includes provisions for area coverage and quality of service. Testing of the installed Radio Frequency backbone system revealed that certain buildings at the INL do not have adequate coverage. The engineered solution to remedy this service deficiency is to install Bi-Directional Amplifiers (BDAs) in the deficient areas. A typical BDA installation includes an outside antenna connected by cabling to an inside repeater which amplifies the signal. The installation process is typical for electrical

390

DOE Joint Genome Institute: Waves of Berkeley Lab Responders Deploy Omics  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2012 1, 2012 Waves of Berkeley Lab Responders Deploy Omics to Track Deepwater Horizon Oil Spill Cleanup Microbes In the aftermath of the Deepwater Horizon oil spill in the Gulf of Mexico two years ago, various strategies were deployed to prevent 4.9 million barrels of light crude oil from fouling the waters and reaching the shores. A team of Lawrence Berkeley National Laboratory (Berkeley Lab) researchers found that nature also played a role in the dispersal process as marine microbial communities responded to the oil plume that made its way from the wellhead at a depth of 5,000 feet to the surface of the water. "There was oil on the surface and oil below, but no oil in between," said microbial ecologist Terry Hazen, former head of the Ecology Department

391

Meeting the challenge of responding to stakeholder information needs: A program model  

SciTech Connect

In a dynamic, changing environment, effective decision-making is reached at the lower levels of an organization. With this concept in mind, Westinghouse Hanford Company designed a comprehensive information release program to manage information as close as possible to the original source. This paper will describe that program and the issues associated with implementing its objectives: improve the release process to respond to stakeholder requirements and liability for noncompliance.

Birkland, V.L. (Boeing Computer Services Co., Richland, WA (United States))

1992-09-01T23:59:59.000Z

392

Sample 8 Semester Plan for NRES Students need 130 hours to graduate.  

E-Print Network (OSTI)

resource systems with emphasis on the ecology, biology, conservation, and management of fish and wildlifeSample 8 Semester Plan for NRES Students need 130 hours to graduate. Year 11 Fall Semester ACES 101 Public Speaking2 IB 103 Intro to Plant Biology Statistics3 or Cultural Studies4 Total Hours Hrs 3 1 3-4 4

Kent, Angela

393

Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices  

E-Print Network (OSTI)

1 Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices Sumit Mitra Ignacio;2 Motivation of this work · Deregulation of the electricity markets caused electricity prices to be highly? (retrofit) · Challenge: Multi-scale nature of the problem! Hourly varying electricity prices vs. 10-15 years

Grossmann, Ignacio E.

394

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project  

E-Print Network (OSTI)

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project Hours · Must be enrolled UW student; work study funding accepted · Experience with Word, Excel, database To apply, submit a detailed letter of application and resume to Beth Freundlich at: History of Cartography

Wisconsin at Madison, University of

395

Short Term Hourly Load Forecasting Using Abductive Networks R. E. Abdel-Aal  

E-Print Network (OSTI)

Short Term Hourly Load Forecasting Using Abductive Networks R. E. Abdel-Aal Center for Applied for this purpose. This paper proposes using the alternative technique of abductive networks, which offers with statistical and empirical models. Using hourly temperature and load data for five years, 24 dedicated models

Abdel-Aal, Radwan E.

396

4/2/2014 www.scienceworldreport.com/home/news/services/print.php?article_id=12131 http://www.scienceworldreport.com/home/news/services/print.php?article_id=12131 1/2  

E-Print Network (OSTI)

4/2/2014 www.scienceworldreport.com/home/news/services/print.php?article_id=12131 http://www.scienceworldreport.com/home/news/services/print.php fabrication foundry that took an initial interest #12;4/2/2014 www.scienceworldreport.com/home/news/services/print.php?article_id=12131 http://www.scienceworldreport.com/home/news/services/print.php?article_id=12131 2/2 in Rao's work

Chiao, Jung-Chih

397

Derivation of 24-Hour Average SO2, Background for the Update 1 Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Derivation of 24-Hour Average SO2, Background for the Update 1 Derivation of 24-Hour Average SO2, Background for the Update 1 Report Derivation of 24-Hour Average SO2, Background for the Update 1 Report Docket No. EO-05-01. As supporting documentation for "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling Unit 1 Emissions in a Cycling Mode" this memo documents the fact that the observed 24-hour SO2 background concentrations during periods when meteorological conditions produce the highest impacts from Unit 1. Derivation of 24-Hour Average SO2, Background for the Update 1 Report More Documents & Publications Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant"

398

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March 2002 to November 2004, showing the model overprediction Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

399

Ia(Sn2) and Id(Sn1) anation reactions of the aquapentaamminerhodium(III) ion  

Science Journals Connector (OSTI)

The anation of aquapentaamminerhodium(III) ion by HC2O 4 ? and C2O 4 2? proceeds according to an Id(Sn1) m...

R. van Eldik

1975-01-01T23:59:59.000Z

400

As you prepare for your upcoming beam time, please be aware that construction is planned to update SLAC Gate 17 with RFID proximity card access hardware and to change the stairs next to the Security hut to an ADA compliant ramp. Please forward this to your proposal collaborators (and ensure that all users have registered and completed training before they arrive). This construction is scheduled to begin Tuesday 5/28 and be completed by 6/28. During this construction, access to the LCLS and SSRL buildings and experimental facilities will be provided as follows: VEHICLES ONLY THROUGH GATE 17 5/28-6/28 0600-1530 (6 am-3:30 pm) Construction Zone. Only VEHICLE traffic will be allowed access through Gate 17 and flagman will provide traffic control. 1530-1800 (3:30-6:00 pm) Assumes construction will have stopped for the day; both traffic lanes will be open for vehicles. 1800-0600 (6 pm-6 am) As now, Gate 17 will be closed or barricaded overnight. PEDESTRIANS ONLY THROUGH GATE 16 5/28-6/28 The pedestrian turnstile at Gate 16A will not change. The turnstile is available for pedestrian use 24/7 as long as the individual has a valid SLAC ID badge (and there is a guard at Gate 30 to 'buzz' them through). 0700-1600 (6 am-4 pm) Pedestrians who would normally walk through Gate 17 will instead follow the detour to Gate 16 swing gate which will be unlocked and staffed by Security. A valid SLAC ID badge is needed to enter; new users without IDs will be allowed to proceed for check-in and badging after confirmation with the User Research Administration Office (see detour map attached). FYI - After the construction is completed and proximity card readers are fully functional, users and staff will enter Gates 17 and 30 using an activated RFID proximity card. More details to follow.  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated Proximity Access at Gate 17 and Sector 30 Automated Proximity Access at Gate 17 and Sector 30 New SLAC ID badges with embedded RFID are used to activate these gates and for off-hours access at the main entrance off Sand Hill Road as well as Alpine Road (gates will be accessible 24/7) . New user badges include this proximity gate activation feature, but older photo IDs need to be updated. Users are advised to register, complete training and contact the User Research Administration (URA) office before arrival for beam time to help facilitate access. During the transition period, July 26-August 9, 2013 users can inform Security at Gate 17 that they are checking in and proceed to the URA office in Building 120; however, after August 9 th , users without a proximity activated ID need to stop at

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" Average Data for Each Choke Setting (before 24-May 2010 06:00), 6-hour average (after 24-May 2010 06:00):" ,,"Choke","Average","Average","Fluid","Methanol","Water","Oil","Gas","Hyd. Eq.","Gas" ,"Choke","Setting","Upstream","Upstream","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery","Recovery" "Date and Time","Setting","Duration","Pressure","Temp.","Rate","Rate","Rate","Rate","Rate","Rate","Portion" "dd-mmm-yy","(64ths)","(hours)","(psia)","(degF)","(bfpd)","(bfpd)","(bwpd)","(bopd)","(mmcfpd)","(boepd)","(%)"

402

Calibration of Predicted Hourly Zone-Level Supply Air Flows with Measurements  

E-Print Network (OSTI)

the chemical composition, then sends a signal to the control system to increase the ventilation rate, if necessary. This system cannot be modeled in eQuest. The null hypothesis H0 is true only if the t-value is less than tcritical; if t-value is greater..., daily and monthly calibration analysis: CV-RMSE[%] vs. t-test CV-RMSE [%] Zone Interval Time step t t,cr 2.1 NE Summer Hourly 18.8 Daily 9.5 Monthly 4.2 3 days Hourly 24.2 2.4 SW Summer Hourly 28.4 Daily 12.7 Monthly 4...

Mihai, A.; Zmeureanu, R.

2013-01-01T23:59:59.000Z

403

GRR/Section 5-ID-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

ID-a - Drilling and Well Development ID-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-ID-a - Drilling and Well Development 05IDADrillingWellDevelopment.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IC §42-233: Appropriation of Water, Geothermal IC §42-4003: Permits IC §42-4004: Processing Applications IC §42-4011: Name of Owner Triggers None specified Click "Edit With Form" above to add content Best Practices Community outreach Talk to the local county Potential Roadblocks Incomplete applications result in longer approval times by IDWR 05IDADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in range.

404

DOI-BLM-ID-I020-2012-0017-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-I020-2012-0017-CX DOI-BLM-ID-I020-2012-0017-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-I020-2012-0017-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type CX Applicant Idaho Geological Survey Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 272 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Idaho Falls District Office Managing Field Office BLM Pocatello Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 10/21/2011

405

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity | Open  

Open Energy Info (EERE)

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-ID-c - Certificate of Public Convenience and Necessity 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies Idaho Code 61-526 IDAPA 31.01.01 Triggers None specified Click "Edit With Form" above to add content 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Electrical corporations must receive a Certificate of Public Convenience

406

GRR/Section 9-ID-a - State Environmental Process | Open Energy Information  

Open Energy Info (EERE)

9-ID-a - State Environmental Process 9-ID-a - State Environmental Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-ID-a - State Environmental Process 09IDAStateEnvironmentalProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Triggers None specified Click "Edit With Form" above to add content 09IDAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has no state-specific EA/EIS equivalent for renewable energy projects. Idaho does have an environmental assessment process for proposed wastewater and drinking water construction projects, but only when grant

407

DOI-BLM-ID-T020-2012-0003-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-T020-2012-0003-CX DOI-BLM-ID-T020-2012-0003-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-T020-2012-0003-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office BLM Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

408

GRR/Section 14-ID-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-ID-d - Section 401 Water Quality Certification GRR/Section 14-ID-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-d - Section 401 Water Quality Certification 14IDDSection401WaterQualityCertificationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDDSection401WaterQualityCertificationProcess.pdf 14IDDSection401WaterQualityCertificationProcess.pdf Error creating thumbnail: Page number not in range.

409

GRR/Section 18-ID-c - Wastewater Pretreatment Permit | Open Energy  

Open Energy Info (EERE)

8-ID-c - Wastewater Pretreatment Permit 8-ID-c - Wastewater Pretreatment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-c - Wastewater Pretreatment Permit 18IDCWastewaterPretreatmentPermit.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 18IDCWastewaterPretreatmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Industrial wastewater permits are issued at the local level. If wastewater is not discharged into a municipal sewer system, the nonpoint source and NPDES permit inquiries are sufficient. A common approach to wastewater treatment is to treat on-site. See Idaho's

410

GRR/Section 11-ID-a - State Cultural Considerations | Open Energy  

Open Energy Info (EERE)

-ID-a - State Cultural Considerations -ID-a - State Cultural Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-ID-a - State Cultural Considerations 11IDAStateCulturalConsiderations (2).pdf Click to View Fullscreen Contact Agencies Idaho State Historical Society Regulations & Policies Idaho's Protection of Graves Statute IS 27-503 Triggers None specified Click "Edit With Form" above to add content 11IDAStateCulturalConsiderations (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has a statute that provides state law protection to cairns and grave sites. The Idaho State Historical Society administers the protections

411

GRR/Section 14-ID-a - Nonpoint Source Pollution | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-a - Nonpoint Source Pollution GRR/Section 14-ID-a - Nonpoint Source Pollution < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-a - Nonpoint Source Pollution 14IDANonpointSourcePollution.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies Clean Water Act Idaho Code Triggers None specified Click "Edit With Form" above to add content 14IDANonpointSourcePollution.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (IDEQ) developed Idaho's

412

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit | Open  

Open Energy Info (EERE)

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-b - Air Quality Permit - Tier II Operating Permit 15IDBAirQualityPermitTierIIOperatingPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDBAirQualityPermitTierIIOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Tier II Operating Permits are issued to facilities or stationary sources

413

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

414

DOI-BLM-ID-110-2009-3825-CE | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-110-2009-3825-CE DOI-BLM-ID-110-2009-3825-CE Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-110-2009-3825-CE CX at Crane Creek Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Crane Creek Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 113 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 6/4/2009

415

GRR/Section 19-ID-a - Water Access and Water Rights | Open Energy  

Open Energy Info (EERE)

19-ID-a - Water Access and Water Rights 19-ID-a - Water Access and Water Rights < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-ID-a - Water Access and Water Rights 19IDAWaterAccessAndWaterRightsIssues.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies Idaho Code Title 42 Triggers None specified Click "Edit With Form" above to add content 19IDAWaterAccessAndWaterRightsIssues.pdf 19IDAWaterAccessAndWaterRightsIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Water Resources (IDWR) has the exclusive authority for regulation of appropriation of the public surface and ground waters of

416

GRR/Section 18-ID-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-b - Hazardous Waste Permit Process GRR/Section 18-ID-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-b - Hazardous Waste Permit Process 18IDBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies Idaho Hazardous Waste Management Act IDAPA 58.01.05 Rules and Standards for Hazardous Waste 40 CFR 124.31 Pre-application public meeting and notice 40 CRF 124.10 Public notice of permit actions and public comment period 40 CFR 124.12 Public hearings 40 CFR 270.13 Contents of Part A of the permit application Triggers None specified Click "Edit With Form" above to add content 18IDBHazardousWastePermitProcess.pdf 18IDBHazardousWastePermitProcess.pdf

417

DOI-BLM-ID-B010-2010-0083-CX | Open Energy Information  

Open Energy Info (EERE)

ID-B010-2010-0083-CX ID-B010-2010-0083-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-B010-2010-0083-CX CX at {{{GeothermalArea}}} for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments ROW across BLM managed lands for access to TGH locations Time Frame (days) Participating Agencies Lead Agency Idaho Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office

418

GRR/Section 20-ID-a - Well Abandonment Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 20-ID-a - Well Abandonment Process GRR/Section 20-ID-a - Well Abandonment Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20-ID-a - Well Abandonment Process 20IDAWellAbandonmentProcess.pdf Click to View Fullscreen Contact Agencies [[Idaho Department of Water Resources]] Regulations & Policies Drilling for Geothermal Resources Rule 45 Triggers None specified Click "Edit With Form" above to add content 20IDAWellAbandonmentProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the well abandonment procedures in the state of Idaho. The director of the Idaho Department of Water Resources

419

Microsoft Word - DOE-ID-INL-12-028-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-12-028 EC Document No.: DOE-ID-INL-12-028 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study SECTION B. Project Description: The National Oceanic and Atmospheric Administration (NOAA) Birch Creek Valley Wind Study would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). The project would use a location near the northeast corner of the Test Area North (TAN) perimeter fence just north of the old TAN parking lot adjacent to the road to the Initial Engine Test (IET) facility and a remote site along Birch Creek near the point where Birch Creek crosses Idaho Highway 22. Field setup would occur as

420

GRR/Section 3-ID-a - State Lands Commercial Geothermal Lease | Open Energy  

Open Energy Info (EERE)

3-ID-a - State Lands Commercial Geothermal Lease 3-ID-a - State Lands Commercial Geothermal Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-a - State Lands Commercial Geothermal Lease 03IDAStateLandsCommercialGeothermalLease (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Idaho State Board of Land Commissioners Regulations & Policies Original Administrative Rule Draft Rules Leasing of Public Lands 58-301 et seq Geothermal Resources 47-1605 IX, Section 8 of Idaho's Constitution Triggers None specified Click "Edit With Form" above to add content 03IDAStateLandsCommercialGeothermalLease (1).pdf 03IDAStateLandsCommercialGeothermalLease (1).pdf Error creating thumbnail: Page number not in range.

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

GRR/Section 12-ID-a - State Flora & Fauna Considerations | Open Energy  

Open Energy Info (EERE)

GRR/Section 12-ID-a - State Flora & Fauna Considerations GRR/Section 12-ID-a - State Flora & Fauna Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-ID-a - State Flora & Fauna Considerations 12IDAFloraFaunaConsiderations.pdf Click to View Fullscreen Contact Agencies Idaho Department of Fish & Game Regulations & Policies Idaho Statutes 36.103 Triggers None specified Click "Edit With Form" above to add content 12IDAFloraFaunaConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Fish & Game preserves wildlife against any direct take, including wild animals, birds, and fish under Idaho Statutes 36.103.

422

GRR/Section 18-ID-d - Solid Waste Management Facilities | Open Energy  

Open Energy Info (EERE)

8-ID-d - Solid Waste Management Facilities 8-ID-d - Solid Waste Management Facilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-d - Solid Waste Management Facilities 18IDDSolidWasteManagementFacilities (2).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.06 Triggers None specified Click "Edit With Form" above to add content 18IDDSolidWasteManagementFacilities (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho considers transfer stations, composting operations, incinerators and landfills solid waste management facilities. The state does not require a

423

GRR/Section 18-ID-a - Underground Storage Tank Systems | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-a - Underground Storage Tank Systems GRR/Section 18-ID-a - Underground Storage Tank Systems < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-a - Underground Storage Tank Systems 18IDAUndergroundStorageTankSystems.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.07 Rules Regulating Underground Storage Tank Systems Triggers None specified Click "Edit With Form" above to add content 18IDAUndergroundStorageTankSystems.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires notification

424

GRR/Section 14-ID-f - 401 NPDES Water Quality Certification | Open Energy  

Open Energy Info (EERE)

ID-f - 401 NPDES Water Quality Certification ID-f - 401 NPDES Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-f - 401 NPDES Water Quality Certification 14IDFSection401NPDESWaterQualityCertification.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDFSection401NPDESWaterQualityCertification.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

425

GRR/Section 3-ID-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

3-ID-c - Encroachment Permit 3-ID-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-c - Encroachment Permit 03IDCEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.42 Triggers None specified Click "Edit With Form" above to add content 03IDCEncroachmentPermit.pdf 03IDCEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer needs an Encroachment Permit from the Idaho Transportation Department (ITD) to add, modify, relocate, maintain, or remove an encroachment on the state highway or within the state highway rights-of way

426

DOI-BLM-ID-220-2009-EA-3709 | Open Energy Information  

Open Energy Info (EERE)

ID-220-2009-EA-3709 ID-220-2009-EA-3709 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-220-2009-EA-3709 EA at Raft River Geothermal Area for Geothermal/Exploration Raft River Geothermal Drilling Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Agua Caliente, LLC Consultant EMPSi Geothermal Area Raft River Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Exploration Drilling Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

427

GRR/Section 14-ID-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-b - NPDES Permitting Process GRR/Section 14-ID-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-b - NPDES Permitting Process 14IDBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14IDBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 'National Pollutant Discharge Elimination System Permits' The NPDES program requires facilities discharging from a point source into

428

GRR/Section 6-ID-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-ID-a - Transportation Permit GRR/Section 6-ID-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-a - Transportation Permit 06IDATransportationPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.21 Triggers None specified Click "Edit With Form" above to add content 06IDATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Overlegal permits are issued to protect the "safety and convenience of the general public." The Idaho Transportation Department is also concerned with

429

DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

265 Million Hours of Supercomputing Time to Advance 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects January 17, 2008 - 10:38am Addthis WASHINGTON, DC -The U.S. Department of Energy's (DOE) Office of Science today announced that 265 million processor-hours were awarded to 55 scientific projects, the largest amount of supercomputing resource awards donated in the Department's history and three times that of last year's award. The projects-with applications from aeronautics to astrophysics, and from climate change to combustion research-were chosen based on their potential breakthroughs in the science and engineering research and their suitability of the project for using supercomputers. These awards will

430

Commercial and Residential Hourly Load Data Now Available on OpenEI! |  

Open Energy Info (EERE)

Commercial and Residential Hourly Load Data Now Available on OpenEI! Commercial and Residential Hourly Load Data Now Available on OpenEI! Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL I am pleased to announce that simulated hourly residential and commercial building load datasets are now available on OpenEI. These datasets are available for all TMY3 locations in the United States. They contain hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). In addition to various

431

Oak Ridge: Approaching 4 Million Safe Work Hours | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ridge: Approaching 4 Million Safe Work Hours Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours March 11, 2013 - 12:03pm Addthis Safety inspections are a key element in a nuclear cleanup environment with large pieces of cleanup equipment. Inspections are essential to continuing safety success and reaching new milestones.| Photo courtesy of Oak Ridge Safety inspections are a key element in a nuclear cleanup environment with large pieces of cleanup equipment. Inspections are essential to continuing safety success and reaching new milestones.| Photo courtesy of Oak Ridge David Sheeley Editor/Writer for Environmental Management's Office of External Affairs Workers at URS | CH2M Oak Ridge (UCOR), the prime contractor for EM's Oak Ridge cleanup, are approaching a milestone of 4 million safe work hours

432

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Ethiopia from DLR Ethiopia from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Ethiopia. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GHI hourly data solar SWERA TILT UNEP Data application/zip icon Download data (zip, 2.1 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

433

WIPP Workers Reach Two Million Man-Hours Without a Lost-Time Accident  

NLE Websites -- All DOE Office Websites (Extended Search)

Workers Reach Two Million Man-Hours Workers Reach Two Million Man-Hours Without a Lost-Time Accident CARLSBAD, N.M., February 22, 2001 - Workers at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) reached a safety milestone Feb. 19 by working two million man-hours without a lost-time accident. According to the National Safety Council, facilities with the same industry code as WIPP lose an average of 20.6 workdays (or 164.8 man-hours) a year to accidents. "Safety is at the core of all WIPP operations," said Dr. Inés Triay, Manager of DOE's Carlsbad Field Office. "We are particularly pleased that WIPP workers reached the two million mark during the time in which they mined a new panel and increased shift work." "To make safety a number one priority means more than creating a safe

434

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Kenya from DLR Kenya from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Kenya. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GEF GHI hourly data Kenya solar SWERA TILT UNEP Data application/zip icon Download data (zip, 3.9 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

435

DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 Million Hours of Supercomputing 95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry January 8, 2007 - 9:59am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 45 projects were awarded a total of 95 million hours of computing time on some of the world's most powerful supercomputers as part of its 2007 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. DOE's Under Secretary for Science Dr. Raymond Orbach presented the awards at the Council on Competitiveness in Washington, DC. Supercomputers are playing an increasingly important role in scientific

436

Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours  

NLE Websites -- All DOE Office Websites (Extended Search)

Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours in VolunteerMatch Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Nonprofit Organizations: Have Your Los Alamos Employees/Retirees Log Hours in VolunteerMatch Lab employees and retirees should log their VolunteerMatch hours to benefit local nonprofits. March 1, 2013 Volunteers help fill sandbags during flood season Volunteers help in many different roles including in healthcare. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email So far, employees and retirees have volunteered more than 1.2 million volunteer hours. If you are a nonprofit organization that has Lab employees or retirees as

437

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Nepal from DLR Nepal from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Nepal. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GEF GHI hourly data Nepal NREL solar SWERA TILT UNEP Data application/zip icon Download data (zip, 1.2 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

438

DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards 265 Million Hours of Supercomputing Time to Advance DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects January 17, 2008 - 10:38am Addthis WASHINGTON, DC -The U.S. Department of Energy's (DOE) Office of Science today announced that 265 million processor-hours were awarded to 55 scientific projects, the largest amount of supercomputing resource awards donated in the Department's history and three times that of last year's award. The projects-with applications from aeronautics to astrophysics, and from climate change to combustion research-were chosen based on their potential breakthroughs in the science and engineering research and their suitability of the project for using supercomputers. These awards will

439

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago  

E-Print Network (OSTI)

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago Representatives of more than 30 countries signed a deal on Tuesday to build the world's most advanced nuclear fusion reactor

440

Workers at EM's West Valley Site Surpass 1 Million Hours without...  

Office of Environmental Management (EM)

Achieving 1 million work hours without a lost-time accident is a true indication of the safety culture that we embrace at the West Valley Demonstration Project," EM WVDP Director...

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Univariate forecasting of day-ahead hourly electricity demand in the northern grid of India  

Science Journals Connector (OSTI)

Short-term electricity demand forecasts (minutes to several hours ahead) have become increasingly important since the rise of the competitive energy markets. The issue is particularly important for India as it has recently set up a power exchange (PX), which has been operating on day-ahead hourly basis. In this study, an attempt has been made to forecast day-ahead hourly demand of electricity in the northern grid of India using univariate time-series forecasting techniques namely multiplicative seasonal ARIMA and Holt-Winters multiplicative exponential smoothing (ES). In-sample forecasts reveal that ARIMA models, except in one case, outperform ES models in terms of lower RMSE, MAE and MAPE criteria. We may conclude that linear time-series models works well to explain day-ahead hourly demand forecasts in the northern grid of India. The findings of the study will immensely help the players in the upcoming power market in India.

Sajal Ghosh

2009-01-01T23:59:59.000Z

442

Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.41  

Energy.gov (U.S. Department of Energy (DOE))

Provides required documentation that Hourly Analysis Program (HAP) version 4.41 meets Internal Revenue Code 179D, Notice 2006-52, dated April 10, 2009, for calculating commercial building energy and power cost savings.

443

ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC requirement)  

E-Print Network (OSTI)

1 ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC variation, health and evolution. Extended Course Description The Human Genome Project and recent advances in genome sequencing techniques have made it possible

444

EPA ENERGY STAR Webcast- Portfolio Manager Office Hours, Focus Topic: Portfolio Manager 2015 Priorities  

Energy.gov (U.S. Department of Energy (DOE))

Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. We will plan to spend the first 20-30 minutes of each...

445

MAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours  

E-Print Network (OSTI)

to understand onshore, offshore, and airborne wind power. Topics include: forces affecting and energy from turbines; and wind measurement technologies. Textbooks (not requiredMAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours 1

Delaware, University of

446

Workers at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness  

Energy.gov (U.S. Department of Energy (DOE))

PADUCAH, Ky. Workers with Paducah site infrastructure contractor Swift & Staley, Inc. recently exceeded 1.5 million hours without lost time away from work due to injury or illness, representing nine years of safe performance.

447

DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science Awards 18 Million Hours of Supercomputing Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific Computing February 1, 2006 - 11:14am Addthis WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman announced today that DOE's Office of Science has awarded a total of 18.2 million hours of computing time on some of the world's most powerful supercomputers to help researchers in government labs, universities, and industry working on projects ranging from designing more efficient engines to better understanding Parkinson's disease. The allocations of computing time are made under DOE's Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program, now in its

448

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Sri Lanka sites from DLR Sri Lanka sites from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Sri Lanka. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI GHI hourly data solar Sri Lanka SWERA TILT UNEP Data application/zip icon Download data (zip, 368.2 KiB) Quality Metrics Level of Review Some Review Comment

449

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Ghana from DLR Ghana from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2001 and 2002 for selected sites in Ghana. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DLR DNI Ghana GHI hourly data solar SWERA TILT TMY UNEP Data application/zip icon ghanaDLRtimeseries_103.zip (zip, 2.7 MiB) Quality Metrics Level of Review Some Review Comment

450

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

451

Solar: hourly global horizontal (GHI) and direct normal (DNI) data for  

Open Energy Info (EERE)

Bangladesh sites from DLR Bangladesh sites from DLR Dataset Summary Description (Abstract): Hourly time series of GHI and DNI for the years 2000, 2002 and 2003 for selected sites in Bangladesh. The hourly data are stored in ASCII files for each station. Please read the documentation file for additional information. (Purpose): For the selected sites, the hourly time series can be used for the simulation of Photovoltaic (PV)-systems or Concentrating Solar Power (CSP)-systems. Source DLR - Deutsches Zentrum für Luft- und Raumfahrt Date Released October 31st, 2004 (10 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords Bangladesh DLR DNI GHI hourly data solar SWERA UNEP Data application/zip icon Download Data (zip, 1.2 MiB) Quality Metrics Level of Review Some Review Comment

452

Pantex celebrates three million hours without a lost time injury | National  

NLE Websites -- All DOE Office Websites (Extended Search)

three million hours without a lost time injury | National three million hours without a lost time injury | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex celebrates three million hours without a ... Pantex celebrates three million hours without a lost time injury Posted By Office of Public Affairs NNSA Blog NNSA Blog

453

Learning environment simulator: a tool for local decision makers and first responders  

SciTech Connect

The National Infrastructure Simulation and Analysis Center (NISAC) has developed a prototype learning environment simulator (LES) based on the Critical Infrastructure Protection Decision Support System (CIPDSS) infrastructure and scenario models. The LES is designed to engage decision makers at the grass-roots level (local/city/state) to deepen their understanding of an evolving crisis, enhance their intuition and allow them to test their own strategies for events before they occur. An initial version is being developed, centered on a pandemic influenza outbreak and has been successfully tested with a group of hospital administrators and first responders. LES is not a predictive tool but rather a simulated environment allowing the user to experience the complexities of a crisis before it happens. Users can contrast various approaches to the crisis, competing with alternative strategies of their own or other participants. LES is designed to assist decision makers in making informed choices by functionally representing relevant scenarios before they occur, including impacts to critical infrastructures with their interdependencies, and estimating human health & safety and economic impacts. In this paper a brief overview of the underlying models are given followed by a description of the LES, its interface and usage and an overview of the experience testing LES with a group of hospital administrators and first responders. The paper concludes with a brief discussion of the work remaining to make LES operational.

Leclaire, Rene J [Los Alamos National Laboratory; Hirsch, Gary B [CLE, INCORPORATED

2009-01-01T23:59:59.000Z

454

Computer Code Gives Astrophysicists First Full Simulation of Star's Final Hours  

ScienceCinema (OSTI)

The precise conditions inside a white dwarf star in the hours leading up to its explosive end as a Type Ia supernova are one of the mysteries confronting astrophysicists studying these massive stellar explosions. But now, a team of researchers, composed of three applied mathematicians at the U.S. Department of Energy's (DOE) Lawrence Berkeley National Laboratory and two astrophysicists, has created the first full-star simulation of the hours preceding the largest thermonuclear explosions in the universe.

Andy Nonaka

2010-01-08T23:59:59.000Z

455

Synthesis of hourly rainfall by a Monte Carlo method using a sixth-order Markov chain  

E-Print Network (OSTI)

the modeling scheme that reproduces the historical sequences. Hudlow (1967) and the author designed a model for producing synthetic rainfall sequences based on these probabilities. Hudlow us d the model to generate three selected storms of the stationary... - or ? Dry Hour (t-29) 30 complete scheme of operating the two Narkov chains to produce each synthetic hourly value. CHAPTER IV TESTING OF THE I'1ODEL Parameter Test Applications The purpose of testing a model for rainfall synthesis is to ensure...

Dale, Walter Marvin

2012-06-07T23:59:59.000Z

456

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID Number: ID Number: REV4 NEPA REVIEW SCREENING FORM DOE/CX-00125, Rev 0 I. Project Title: MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 II. Project Description and location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or

457

Mixed (s+id)-wave order parameters in the Van Hove scenario  

Science Journals Connector (OSTI)

In the Van Hove scenario including orthorhombic distortion effect, we develop a pair of coupled gap equations for the mixed (s+id)-wave order parameter. It is found that a mixed s+id symmetry state is realized in a certain range of relative strength of the s and d interactions, and there are two second-order transitions between the mixed and the pure symmetry states. Particular attention is paid to the temperature dependence of two components in the mixed order parameter as well as their evolution from a pure s to a pure d symmetry state.

M. Liu; D. Y. Xing; Z. D. Wang

1997-02-01T23:59:59.000Z

458

Id1 expression promotes peripheral CD4{sup +} T cell proliferation and survival upon TCR activation without co-stimulation  

SciTech Connect

Highlights: Id1 expression enables nave T cell proliferation without anti-CD28 co-stimulation. Id1 expression facilitates T cells survival when stimulated with anti-CD3. Elevation of IL-2 production by Id1 contributes increased proliferation and survival. Id1 potentiates NF-?B activation by anti-CD3 stimulation. -- Abstract: Although the role of E proteins in the thymocyte development is well documented, much less is known about their function in peripheral T cells. Here we demonstrated that CD4 promoter-driven transgenic expression of Id1, a naturally occurring dominant-negative inhibitor of E proteins, can substitute for the co-stimulatory signal delivered by CD28 to facilitate the proliferation and survival of nave CD4{sup +} cells upon anti-CD3 stimulation. We next discovered that IL-2 production and NF-?B activity after anti-CD3 stimulation were significantly elevated in Id1-expressing cells, which may be, at least in part, responsible for the augmentation of their proliferation and survival. Taken together, results from this study suggest an important role of E and Id proteins in peripheral T cell activation. The ability of Id proteins to by-pass co-stimulatory signals to enable T cell activation has significant implications in regulating T cell immunity.

Liu, Chen; Jin, Rong [Department of Immunology, Peking University Health Science Center, Beijing (China)] [Department of Immunology, Peking University Health Science Center, Beijing (China); Wang, Hong-Cheng [Oklahoma Medical Research Foundation, Oklahoma City, OK (United States)] [Oklahoma Medical Research Foundation, Oklahoma City, OK (United States); Tang, Hui; Liu, Yuan-Feng; Qian, Xiao-Ping; Sun, Xiu-Yuan; Ge, Qing [Department of Immunology, Peking University Health Science Center, Beijing (China)] [Department of Immunology, Peking University Health Science Center, Beijing (China); Sun, Xiao-Hong, E-mail: sunx@omrf.org [Oklahoma Medical Research Foundation, Oklahoma City, OK (United States)] [Oklahoma Medical Research Foundation, Oklahoma City, OK (United States); Zhang, Yu, E-mail: zhangyu007@bjmu.edu.cn [Department of Immunology, Peking University Health Science Center, Beijing (China)] [Department of Immunology, Peking University Health Science Center, Beijing (China)

2013-06-21T23:59:59.000Z

459

http://www.cellmolbiol.com/resume_online_papers.php?Id_Article=1001&Annee=2002 GINKGO BILOBA EXTRACT (EGb 761)  

E-Print Network (OSTI)

http://www.cellmolbiol.com/resume_online_papers.php?Id_Article=1001&Annee=2002 GINKGO BILOBA. The two isoenzymes of high ouabain affinity however, http://www.cellmolbiol.com/resume_online_papers.php?Id_Article=1001&Annee=2002 (1 of 2) [5/23/2008 12:49:21 PM] #12;http://www.cellmolbiol.com/resume_online_papers.php

Brand, Paul H.

460

User-centric identity as a service-architecture for eIDs with selective attribute disclosure  

Science Journals Connector (OSTI)

Unique identification and secure authentication of users are essential processes in numerous security-critical areas such as e-Government, e-Banking, or e-Business. Therefore, many countries (particularly in Europe) have implemented national eID solutions ... Keywords: Austrian eID, authentication, citizen card, cloud computing, identity management, privacy, public cloud, selective attribute disclosure

Daniel Slamanig, Klaus Stranacher, Bernd Zwattendorfer

2014-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Genevieve Saur (Primary Contact), Chris Ainscough. National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-3783 Email: genevieve.saur@nrel.gov DOE Manager HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov Project Start Date: October 1, 2010 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Corroborate recent wind electrolysis cost studies using a * more detailed hour-by-hour analysis. Examine consequences of different system configuration * and operation for four scenarios, at 42 sites in five

462

Alertness, performance and off-duty sleep on 8-hour and 12-hour night shifts in a simulated continuous operations control room setting  

SciTech Connect

A growing number of nuclear power plants in the United States have adopted routine 12-hr shift schedules. Because of the potential impact that extended work shifts could have on safe and efficient power plant operation, the U.S. Nuclear Regulatory Commission funded research on 8-hr and 12-hr shifts at the Human Alertness Research Center (HARC) in Boston, Massachusetts. This report describes the research undertaken: a study of simulated 8-hr and 12-hr work shifts that compares alertness, speed, and accuracy at responding to simulator alarms, and relative cognitive performance, self-rated mood and vigor, and sleep-wake patterns of 8-hr versus 12-hr shift workers.

Baker, T.L. [Institute for Circadian Physiology, Boston, MA (United States)

1995-04-01T23:59:59.000Z

463

Among- and within-patch components of genetic diversity respond at different rates to habitat fragmentation: an empirical demonstration  

Science Journals Connector (OSTI)

...research-article Among- and within-patch components of genetic diversity respond...both these responses to decreased habitat patch connectivity (Soule 1972; Hanfling Brandl...effects of habitat fragmentation and habitat patch isolation, this phenomenon has not previously...

2005-01-01T23:59:59.000Z

464

The RECS relies on the respondents to provide the energy related details of their homes  

Gasoline and Diesel Fuel Update (EIA)

Householder's Perceptions of Insulation Adequacy and Householder's Perceptions of Insulation Adequacy and Drafts in the Home in 2001 Behjat Hojjati , PhD Energy Information Administration U.S. Department of Energy 1000 Independence Ave., SW, EI-63 Washington, DC 20585 behjat.hojjati@eia.doe.gov September 2004 Abstract In order to improve the estimation of end-use heating consumption, the Energy Information Administration's (EIA), 2001 Residential Energy Consumption Survey (RECS), for the first time, asked respondents to judge how drafty they perceived their homes to be as a measure of insulation quality. The analysis of the 2001 RECS data shows that householders in newly- constructed homes perceived their homes to be better insulated and less drafty than do householders in older homes. Single-family homes are perceived to be better insulated and less

465

Review of Requirements and Capabilities For Analyzing and Responding to Beyond Design Basis Events  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of Requirements Review of Requirements and Capabilities for Analyzing and Responding to Beyond Design Basis Events Office of Nuclear Safety Office of Health, Safety and Security U.S. Department of Energy August 2011 2011 Safety Bulletin Report TABLE OF CONTENTS Acronyms i Executive Summary ii 1. Introduction 1 2. Report Overview 1 3. Overview of DOE Nuclear Facilities and Operations 2 4. Analysis of Safety Bulletin Submittals 2 5. Review of DOE and Commercial Nuclear Power Industry Requirements and 5 Guidance for BDBEs 6. Results from the Nuclear Safety Workshop 9 7. Summary of Insights and Opportunities for Improvement 10 8. Summary of Recommendations 12 9. Conclusions 14 Appendix A - DOE's Nuclear Safety Approach 15

466

Ice Slurry Medical Protective Organ Cooling: Buying Surgeons and Emergency Responders More Time  

NLE Websites -- All DOE Office Websites (Extended Search)

Slurry Medical Protective Organ Cooling: Slurry Medical Protective Organ Cooling: Buying Surgeons and Emergency Responders More Time Prepared by Ken Kasza* (PhD) and Yue Wu* (PhD) *Argonne National Laboratory 10-9-09 yuewu@anl.gov; 630-252-7203 Surgical procedures are pushing the limits of technical excision and becoming less invasive through the development and use of laparoscopic procedures assisted by surgeon/machine robotic manipulations. There is an unmet need to protect critical organs and various tissue masses during the course of surgical manipulations. Multiple tissue sites and organ systems that require complex operative manipulations to cure disease are often exposed to ischemic, traumatic, and xenobiotic insults that can result in loss of function or life-threatening conditions. Ice slurry production and delivery equipment developed by

467

Review of Requirements and Capabilities For Analyzing and Responding to Beyond Design Basis Events  

NLE Websites -- All DOE Office Websites (Extended Search)

to the to the Secretary of Energy Review of Requirements and Capabilities for Analyzing and Responding to Beyond Design Basis Events Office of Nuclear Safety Office of Health, Safety and Security U.S. Department of Energy August 2011 2011 Safety Bulletin Report TABLE OF CONTENTS Acronyms i Executive Summary ii 1. Introduction 1 2. Report Overview 1 3. Overview of DOE Nuclear Facilities and Operations 2 4. Analysis of Safety Bulletin Submittals 2 5. Review of DOE and Commercial Nuclear Power Industry Requirements and 5 Guidance for BDBEs 6. Results from the Nuclear Safety Workshop 9 7. Summary of Insights and Opportunities for Improvement 10 8. Summary of Recommendations 12 9. Conclusions 14

468

A multi-agent design for sense and respond logistics simulation  

Science Journals Connector (OSTI)

Sense and Respond Logistics (SARL) is a highly flexible, agile, and adaptive methodology for managing logistics resources in a network-centric and information rich environment. Designing and developing the software for simulating a system with such complexity presents challenges that stem from the role of heterogeneous communication channels and decision choices that produce non-deterministic outcomes. We describe the use of multi-agent approaches for simulating SARL applications. We also argue for the use of formal methods and aspect-oriented techniques in the design of these simulations, to assist in supporting model validation and verification. Features of an aspect-oriented, multi-agent, architectural description languages are also presented as a mechanism for reasoning about cross-cutting concerns.

Martin C. Lundell; Dianxiang Xu; Denver Tolliver; Kendall E. Nygard

2007-01-01T23:59:59.000Z

469

Online Submission ID: 1199 Gremlin: An Interactive Visualization Model for Analyzing  

E-Print Network (OSTI)

Online Submission ID: 1199 Gremlin: An Interactive Visualization Model for Analyzing Genomic Rearrangements Category: Research Fig. 1. Our new method for visualizing genome rearrangements: deletions (green), inversions (brown), and inter-chromosomal translocations (cyan) classified from a cancer genome with respect

Laidlaw, David

470

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1  

E-Print Network (OSTI)

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1 Yuanhui Zhang, Ted waste and to produce renewable energy from swine manure. Experimental results showed that operating, gasification, and liquefaction. Among the TCC processes, direct liquefaction is the most widely studied biomass

He, Brian

471

Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 1)  

DOE Data Explorer (OSTI)

These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 1 are the pattern and configuration files for the pattern showed in Figure 2a in the paper.

Seibert, M. Marvin; Ekeberg, Tomas; Maia, Filipe R.N.C.

472

Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 2)  

DOE Data Explorer (OSTI)

These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 2 are the pattern and configuration files for the pattern showed in Figure 2b in the paper.

Seibert, M. Marvin; Ekeberg, Tomas

473

Academic Staff ESS Coversheet Candidate Name (Last, First, M.I.) Banner ID  

E-Print Network (OSTI)

rev. 6/14 Academic Staff ESS Coversheet Candidate Name (Last, First, M.I.) Banner ID Primary School Initial WSU appointment date Length of ESS-track service (in years & months) Academic Services Officer Archivist Initial WSU rank Dates off ESS-track/Reason Extens Prgm Coordinator Financial Aid Officer Date

VandeVord, Pamela

474

AdvANCE CoNFErENCE GuIdE 2007 JavaoneSM  

E-Print Network (OSTI)

registration confirmation) as their Referral Code when registering for the 2007 JavaOneSM conference. You can receive the Referral Gift described below, based on the total number of completed registrations we receive that list your Registration ID number as the Referral Code. All Referral Codes must be submitted at the time

Tomkins, Andrew

475

Paper ID# 901691 BLIND SIGNAL PARAMETER ESTIMATION FOR THE RAPID RADIO FRAMEWORK  

E-Print Network (OSTI)

implementation methodology for rapid deployment. An automated tool for signal analysis requires several stagesPaper ID# 901691 1 of 7 BLIND SIGNAL PARAMETER ESTIMATION FOR THE RAPID RADIO FRAMEWORK Adolfo it is desirable or even essential to rapidly build a functional radio receiver to recover symbols from an unknown

476

Technical article Wiley Handbook of Science and Technology for Homeland Security Article ID: XXXX Page 17  

E-Print Network (OSTI)

of any distributed computing system (DCS) is to offer a flexible, reliable and powerful computingTechnical article Wiley Handbook of Science and Technology for Homeland Security Article ID: XXXX when operated or deployed in harsh or threat-prone environments. For instance, in WSNs deployed

Hayat, Majeed M.

477

COMPUTER SCIENCE @ UCI >>> WhaT dId yOU lEaRN?  

E-Print Network (OSTI)

COMPUTER SCIENCE @ UCI >>> WhaT dId yOU lEaRN? My COURSES havE INClUdEd: Computer Graphics I these environments with avatars. Embedded Computing Systems I designed an intelligent hexapod robot that used optical Languages I built a personnel-scheduling application that integrated components written in multiple computer

Barrett, Jeffrey A.

478

Bachelor of Science, Social Science, 2013-2014 Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Social Science, 2013-2014 Name ID# Date General Degree Requirements Residency DLM Mathematics 3-4 DLN Natural, Physical, & Applied Sciences course with lab 4 DLN Natural, Physical, and Applied Sciences course 3-4 DLV Visual and Performing Arts 3 DLL Literature and Humanities 3-4 DLS Social

Barrash, Warren

479

Bachelor of Science, Social Science, 2012-2013 Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Social Science, 2012-2013 Name ID# Date General Degree Requirements Residency DLM Mathematics 3-4 DLN Natural, Physical, & Applied Sciences course with lab 4 DLN Natural, Physical, and Applied Sciences course 3-4 DLV Visual and Performing Arts 3 DLL Literature and Humanities 3-4 DLS Social

Barrash, Warren

480

Bachelor of Science, Social Science, 2014-2015 Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Social Science, 2014-2015 Name ID# Date General Degree Requirements Residency DLM Mathematics 3-4 DLN Natural, Physical, & Applied Sciences course with lab 4 DLN Natural, Physical, and Applied Sciences course 3-4 DLV Visual and Performing Arts 3 DLL Literature and Humanities 3-4 DLS Social

Barrash, Warren

Note: This page contains sample records for the topic "hours respondent id" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

ORNL 2010-G00658/jcn UT-B ID PFTT-200902257  

E-Print Network (OSTI)

ORNL 2010-G00658/jcn UT-B ID PFTT-200902257 High Performance Anode Material Technology Summary Scientists at ORNL have developed a new nano-wire anode material that overcomes the limitations of similar anode materials that have poor capacity retention and/or high production cost. The ORNL material uses

482

http://royalsociety.org/news.asp?id=8827 Latest press releases  

E-Print Network (OSTI)

to science that improves crops and sustainable crop management must be a Government priority. This would see in the report include: - Short-term (less than 8 years): New approaches to crop management including modifiedhttp://royalsociety.org/news.asp?id=8827 Latest press releases £2 billion needed for science 'Grand

Utrecht, Universiteit

483

1. Telefnica I+D 1.1. Implementacin y evaluacin de prestaciones de un  

E-Print Network (OSTI)

1. Telefónica I+D 1.1. Implementación y evaluación de prestaciones de un PCE multicapa Tutor: Dr del protocolo PCE en entornos multicapa. El alumno partirá sobre un desarrollo del PCE, por lo que debe realizar únicamente las extensiones necesarias. El alumno deberá evaluar las prestaciones del PCE

Autonoma de Madrid, Universidad

484

An Introductory Analysis of Auto-ID Applications in the Department of Defense Supply Chains  

E-Print Network (OSTI)

Daniel W. Engels, Robin Koh, Elaine Lai, Edmund W. Schuster Auto-ID Center, Massachusetts Institute of responsibilities to protect U.S. interests around the world. In discharging these responsibilities, the DoD must variety of items, 4) unsta- ble demand, 5) moving end points, 6) emphasis on reliability and maintenance

Brock, David

485

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01  

E-Print Network (OSTI)

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01 Title: Hungry Horse Mitigation/Flathead Lake Confederated Salish and Kootenai Tribes A. Abstract This project was initiated in 1992 after NPCC annual funding since that time. This project specifically addresses the losses on the Flathead Indian

486

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, 2014-2015 Name ID Intro to Sociology 3 DLS Social Sciences course in a second field 3 CID HLTHST 382 Research Methods Pharmacology and Contrast Medias RADSCI 430 Comparative Sectional Imaging RADSCI 440 Principles of Magnetic

Barrash, Warren

487

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, 2012-2013 Name ID Intro to Sociology 3 DLS Social Sciences course in a second field 3 CID HLTHST 382 Research Methods Pharmacology and Contrast Medias RADSCI 430 Comparative Sectional Imaging RADSCI 440 Principles of Magnetic

Barrash, Warren

488

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, Name ID# Date  

E-Print Network (OSTI)

Bachelor of Science, Radiologic Sciences, Magnetic Resonance Imaging Emphasis, 2013-2014 Name ID Intro to Sociology 3 DLS Social Sciences course in a second field 3 CID HLTHST 382 Research Methods Pharmacology and Contrast Medias RADSCI 430 Comparative Sectional Imaging RADSCI 440 Principles of Magnetic

Barrash, Warren

489

Topic 03 Nathalie Job ID 280 Carbon xerogels as supports for catalysts and electrocatalysts  

E-Print Network (OSTI)

as electrocatalysts in PEM fuel cell cathodes. In both cases, the well-adapted structure of the support provedTopic 03 Nathalie Job ID 280 Carbon xerogels as supports for catalysts and electrocatalysts aggregates, which depends on the carbon implementation. These drawbacks call for the development of carbon

Paris-Sud XI, Université de

490

1. CONTRACT ID CODE PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

3 1. CONTRACT ID CODE PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2. MODIFICATION OF CONTRACT! ORDeR NO. DE-AC05-76RL01830 .. DUNS # 032987476 ~ 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

491

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 28  

E-Print Network (OSTI)

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 28 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS # 032987476 s DE-AC05-76RL01830 10B. DATED (SEE ITEM 13} CODE FACILITY ONLY TO MODIFICATIONS OF COF^TTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

492

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1 1 2 ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14 IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. D B. THE ABOVE NUMBERED CONTRACTIORDER

493

11. CONTRACT ID CODE IPAGE1 OFI AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2  

E-Print Network (OSTI)

11. CONTRACT ID CODE IPAGE1 OFI PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2 2 County, WA 99352 10A. MODIFICATION OF CONTRACT/ ORDER NO. DUNS# 032987476 DE-AC05-76RL01830 ~ 10B. DATED AND APPROPRIATION DATA (Ifrequired} CHECK ONE D D D 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS

494

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 3 3. MODIFICATION OF CONTRACT/ ORDER NO. DE-AC05-76RLO1830 DUNS # 032987476 ~ 108. DATED (SEE /TEM 13) CODE FACILITY ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

495

ICED'09/Paper number (Contribution ID) 1 INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED'09  

E-Print Network (OSTI)

ICED'09/Paper number (Contribution ID) 1 INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED'09 24 - 27 AUGUST 2009, STANFORD UNIVERSITY, STANFORD, CA, USA CREATIVITY THEORIES AND SCIENTIFIC DISCOVERY: A STUDY OF C-K THEORY AND INFUSED DESIGN ABSTRACT Creativity is central to human activity

Shai, Offer

496

Asking for Help Using Inverse Semantics Author Names Omitted for Anonymous Review. Paper-ID 69  

E-Print Network (OSTI)

Asking for Help Using Inverse Semantics Author Names Omitted for Anonymous Review. Paper-ID 69 an approach for enabling a robot to recover from failures by communicating its need for specific help targeted spoken-language requests for help such as "Please give me the white table leg that is on the black

Tellex, Stefanie

497

Texas A&M NetID Lifecycle Management for Texas A&M University Students  

E-Print Network (OSTI)

Texas A&M NetID Lifecycle Management for Texas A&M University Students This document describes and Galveston, are admitted to both College Station and Galveston, and may even enroll for courses at both College Station and Galveston in the same semester. This section describes the student lifecycle states

498

Time-Resolved Research at the Advanced Photon Source Beamline 7-ID  

SciTech Connect

The Sector 7 undulator beamline (7-ID) of the Advanced Photon Source (APS) is dedicated to time-resolved x-ray research and is capable of ultrafast measurements on the order of 100 ps. Beamline 7-ID has a laser laboratory featuring a Ti:Sapphire system (average power of 2.5W, pulse duration <50 fs, repetition rate 1-5 kHz) that can be synchronized to the bunch pattern of the storage ring. The laser is deliverable to x-ray enclosures, which contain diffractometers, as well as motorized optical tables for table-top experiments. Beamline 7-ID has a single APS Undulator A and uses a diamond (111) double-crystal monochromator, providing good energy resolution over a range of 6-24 keV. Available optics include Kirkpatrick-Baez (KB) mirrors to microfocus the x-ray beam. A variety of time-resolved diffraction and spectroscopy research is available at 7-ID, with experiments being done in the atomic, molecular, optical, chemistry, and solid state (bulk and surface) fields.

Dufresne, Eric M.; Adams, Bernhard; Arms, Dohn A.; Chollet, Matthieu; Landahl, Eric C.; Li, Yuelin; Walko, Donald A.; Wang, Jin

2010-08-02T23:59:59.000Z

499

OUHSC Office of Research Administration For ORA Use Only Subcontract Cover Page Subcontract ID#: __________________  

E-Print Network (OSTI)

OUHSC Office of Research Administration For ORA Use Only Subcontract Cover Page Subcontract ID Justification (Can be in NIH Format) Not applicable if Subcontractor is Foreign. Purchasing Approval PURCHASING (attach completed form) No Exempt: For Purchasing Use Only Date received in Purchasing: Purchasing

Oklahoma, University of

500

Geometry-based semantic ID for persistent and interoperable reference in feature-based parametric modeling  

Science Journals Connector (OSTI)

In current feature-based parametric design systems, the reusability principle is not fully supported as it was expected. Unpredictability and ambiguity of models often happen during design modification within one system as well as among different systems. ... Keywords: Continuity, Feature-based parametric modeling, Parametric family, Persistent naming, Topological ID

Yan Wang; Bartholomew O. Nnaji

2005-09-01T23:59:59.000Z