Powered by Deep Web Technologies
Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - 201205_2012-OPSPLAN-Goal3-Survey-QuarterlyRpt.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FTCP Quarterly Report FTCP Quarterly Report Survey to Determine if the FTCP Quarterly Report Continues to Fulfill a Useful Function FTCP Agents Review and Feedback The survey below is designed to solicit: 1) input and feedback on effectiveness of current practices, and 2) recommended strategies and approaches to continuously improve the FTCP's ability in meetings its objectives with the FTCP Quarterly Report recipients' (Program Secretarial Officers, Site Managers). This survey is responsive to the Federal Technical Capability Program FY 2012 Operational Plan, Goal 3, "in improving FTCP management processes" Background: This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Programs (TQPs) and technical skill

2

IEEE COMMUNICATIONS SURVEYS & TUTORIALS, VOL. 16, NO. 3, THIRD QUARTER 2014 1709 A Survey of Energy Efficiency in Buildings and  

E-Print Network (OSTI)

IEEE COMMUNICATIONS SURVEYS & TUTORIALS, VOL. 16, NO. 3, THIRD QUARTER 2014 1709 A Survey of Energy) and the provider-side (smart grids). Hence, combining energy efficiency and networking perspectives, in this paper Efficiency in Buildings and Microgrids using Networking Technologies Jianli Pan, Student Member, IEEE, Raj

Jain, Raj

3

524 IEEE COMMUNICATIONS SURVEYS & TUTORIALS, VOL. 13, NO. 4, FOURTH QUARTER 2011 Green Cellular Networks: A Survey, Some Research  

E-Print Network (OSTI)

524 IEEE COMMUNICATIONS SURVEYS & TUTORIALS, VOL. 13, NO. 4, FOURTH QUARTER 2011 Green Cellular in realizing a "green" cellular network technology. Index Terms--Green communication, energy efficient net and challenges and suggest some techniques to enable an energy efficient or "green" cellular network. Since base

Shihada, Basem

4

Results of the fourth quarter tritium survey of the F- and H-Area seeplines: March--April 1993  

SciTech Connect

The Environmental Sciences Section (ESS) established a quarterly monitoring program of the Four Mile Creek seepline down gradient from the F- and H-Area seepage basins. The program surveys and tracks changes in tritium, specific conductivity, and pH for the seepline water. Measurements from the fourth quarter survey (March/April 1993) showed lower tritium and conductivity measurements and higher pH values (pH 5--6) than measurements from previous studies. The results of the first four quarterly surveys suggest that infiltration of rainfall may be diluting and flushing the contaminants from the groundwater system. More measurements are needed to confirm these trends.

Dixon, K.L.; Rogers, V.A.

1993-07-01T23:59:59.000Z

5

Results of the quarterly tritium survey of Fourmile Branch and its seeplines in the F- and H-Areas of SRS: September 1993  

SciTech Connect

The Environmental Sciences Section (ESS) established a quarterly monitoring program of the Fourmile Branch (FMB) seepline down gradient from the F- and H-Area seepage basins. The program surveys and tracks changes in tritium, specific conductivity, and pH for the seepline water. Measurements from the sixth quarterly survey (September 1993) showed higher tritium and conductivity measurements and higher pH values (pH 5 - 6) than measurements from previous studies. Increased tritium concentrations and conductivity values, as compared to previous surveys, were attributed to decreased rainfall prior to the sampling event However, overall results of the tritium survey and stream monitoring data (Looney et al., 1993) suggest that the tritium plume is flushing from the FMB system.

Dixon, K.L.; Rogers, V.A.; Looney, B.B.

1994-06-01T23:59:59.000Z

6

Results of the Quarterly Tritium Survey of Fourmile Branch and Its Seeplines in the F and H Areas of SRS: May 1995  

SciTech Connect

The Environmental Sciences Section of the Savannah River Technology Center established a quarterly monitoring program of the Fourmile Branch stream and its associated seepline located down gradient from the F- and H-Area Seepage Basins. The primary focus of this program was to survey and track changes in tritium levels; however, specific conductivity, and pH were also surveyed and tracked. The measurement from the eleventh survey (May 1995) exhibited similar tritium levels, conductivity measurements, and pH values to data from previous sampling events. The overall results of the tritium survey and stream monitoring data (Looney et al., 1993) indicate that the tritium plume resulting from the past operation of the seepage basins continues to flush from the Fourmile Branch wetland system.

Koch, J.W. [Westinghouse Savannah River Company, AIKEN, SC (United States); Dixon, K.L.

1995-09-14T23:59:59.000Z

7

Results of the quarterly tritium survey of Fourmile Branch and its seeplines in the F {ampersand} H areas of SRS: December 1994  

SciTech Connect

The Environmental Sciences Section (ESS) of the Savannah River Technology Center (SRTC) established a quarterly monitoring program of the Fourmile Branch (FMB) stream and its associated seepline located down gradient from the F- and H-Area Seepage Basins. The primary focus of this program was to survey and track changes in tritium levels; however, specific conductivity, and pH were also surveyed and tracked. The measurements from the tenth scheduled survey (December 1994) exhibited similar tritium levels, conductivity measurements, and pH values to data from previous sampling events. The overall results of the tritium survey and stream monitoring data (Looney et al., 1993) indicates that the tritium plume resulting from the operation of the seepage basins continues to flush from the Fourmile Branch wetland system.

Koch, J.W. II; Dixon, K.L.; Looney, B.B.

1994-12-01T23:59:59.000Z

8

hourly | OpenEI  

Open Energy Info (EERE)

hourly hourly Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (7 months ago) Date Updated July 02nd, 2013 (5 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

9

Fossil Energy Today - Second Quarter, 2011 | Department of Energy  

Energy Savers (EERE)

Quarter, 2011 Topics In This Issue... Office Reorganization McConnell Joins FE Staff Coal Cleaning Commercial Success Sonar Survey Program Heating Oil Reserve Converts Stock...

10

Quarterly Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

11

Common Help Room Hours  

E-Print Network (OSTI)

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16200 - MATH 205 - Nathanael Cox...

12

Common Help Room Hours  

E-Print Network (OSTI)

Common Help Room Hours for Spring 2015. Monday, Tuesday, Wednesday, Thursday, Friday. 10:30 am. 11:30 am. MA 16010 - MATH 205 - Alessandra...

13

Contacts / Hours - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

14

LIBRARY SERVICES LIBRARY HOURS  

E-Print Network (OSTI)

LIBRARY SERVICES LIBRARY HOURS Up-to-date library hours are posted at http Wesleyan ID that is linked to the library circulation database is needed to charge out library materials to visit the Circulation Office in Olin Library 115 to set up their borrowing privileges. If you have

Royer, Dana

15

Quarterly coal report  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

Young, P.

1996-05-01T23:59:59.000Z

16

Directives Quarterly Updates  

Directives, Delegations, and Requirements

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

17

Federal Technical Capability Program - Quarterly Performance Indicator  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Performance Indicator Reports Quarterly Performance Indicator Reports 2013 Quarterly Report on Federal Technical Capability August 16, 2013 Quarterly Report on Federal Technical Capability June 5, 2013 Quarterly Report on Federal Technical Capability February 20, 2013 2012 Quarterly Report on Federal Technical Capability November 20, 2012 Quarterly Report on Federal Technical Capability August 8, 2012 Quarterly Report on Federal Technical Capability May 30, 2012 Quarterly Report on Federal Technical Capability March 6, 2012 2011 Quarterly Report on Federal Technical Capability November 10, 2011 Quarterly Report on Federal Technical Capability August 24, 2011 Quarterly Report on Federal Technical Capability May 18, 2011 Quarterly Report on Federal Technical Capability February 23, 2011

18

EIA -Quarterly Coal Distribution  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Distribution Coal Distribution Home > Coal> Quarterly Coal Distribution Back Issues Quarterly Coal Distribution Archives Release Date: June 27, 2013 Next Release Date: September 2013 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf October-December pdf xls pdf 2010 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf xls

19

Temporary Hourly Archaeological Field  

E-Print Network (OSTI)

, conduct applied research, and offer career development and learning opportunities to support resource carpooled. RESPONSIBILITIES Under the general direction of the CEMML archaeological Crew Chief, conduct archaeological field work involving archaeological inventory survey operations on various tracts of military

20

Industrial Assessment Centers Quarterly Update, Spring 2014 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Centers Quarterly Update, Spring 2014 Read the Industrial Assessment Centers (IAC) Quarterly Update -- Spring 2014 Industrial Assessment Centers (IAC) Quarterly Update...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

A survey for redshifted molecular and atomic absorption lines - II. Associated HI, OH and millimetre lines in the z >~ 3 Parkes quarter-Jansky flat-spectrum sample  

E-Print Network (OSTI)

We present the results of a z>2.9 survey for HI 21-cm and molecular absorption in the hosts of radio quasars using the GMRT and the Tidbinbilla 70-m telescope. Previously published searches, which are overwhelmingly at redshifts of z2.5. We therefore believe that our high redshift selection is responsible for our exclusive non-detections, and find that at ultra-violet luminosities of >10e23 W/Hz, 21-cm absorption has never been detected. We also find this to not only apply to our targets, but also those at low redshift exhibiting similar luminosities, giving zero detections out of a total of 16 sources over z=0.24 to 3.8. This is in contrast to the absorption. The mix of 21-cm detections and non-detections is currently attributed to orientation effects, where according to unified schemes of active galactic nuclei, 21-cm absorption is more likely to occur in sources designated as radio galaxies (type-2 objects, where the nucleus is viewed through dense obscuring circumnuclear gas) than in quasars(type-1 objects, where we have a direct view to the nucleus). However, due to the exclusively high ultra-violet luminosities of our targets it is not clear whether orientation effects alone can wholly account for the distribution, although there exists the possibility that the large luminosities are indicative of a changing demographic of galaxy types. We also find that below luminosities of ~10e23 W/Hz, both type-1 and type-2 objects have a 50% likelihood of exhibiting 21-cm absorption.

S. J. Curran; M. T. Whiting; T. Wiklind; J. K. Webb; M. T. Murphy; C. R. Purcell

2012-01-07T23:59:59.000Z

22

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network (OSTI)

STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT OCTOBER 1 ­ DECEMBER 31, 1996 #12;1 1 AN EXPERIMENTAL that in the vertical case. 1.2 INTRODUCTION The process of boiling in porous media is of significance in geothermal

Stanford University

23

STANFORD GEOTHERMAL QUARTERLY REPORT  

E-Print Network (OSTI)

1 STANFORD GEOTHERMAL PROGRAM QUARTERLY REPORT JANUARY 1 - MARCH 31, 1997 #12;2 1 AN EXPERIMENTAL in geothermal systems as well as in many other applications such as porous heat pipes, drying and nuclear waste

Stanford University

24

NERSC Edison Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Hours Used Edison Hours Used 2014 Edison Usage Chart Edison Usage Chart 2013 Edison Usage Chart Edison Usage Chart 2014 Date Hours Used (in millions) Percent of Maximum Possible...

25

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Report Quarterly Coal Report Release Date: October 02, 2013 | Next Release Date: December 2013 | full report Previous Quarterly Coal Data historical data (PDF): 1st quarter 2013 4th quarter 2012 3rd quarter 2012 2nd quarter 2012 1st quarter 2012 4th quarter 2011 3rd quarter 2011 2nd quarter 2011 1st quarter 2011 prior to 2011 Go The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and refined coal. Data on U.S. coke production, consumption, stocks, imports, and exports are also provided. All data for 2011 and prior years are final. All data for 2012 and 2013 are preliminary. Highlights for second quarter 2013: U.S. coal production during second quarter 2013 totaled 243.1

26

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network (OSTI)

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $765.00 15 2 $22,950.00 ISS, Engineering, Journalism & Mass Communications, Music and Social Welfare fees. These amounts do NOT include to complete at least 12 hours each fall and spring semester. Calculations are based on 15 hours (an average

27

Short-term energy outlook quarterly projections. Third quarter 1997  

SciTech Connect

This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

NONE

1997-07-01T23:59:59.000Z

28

Threat Insight Quarterly Regulatory Compliance  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Regulatory Compliance www.iss.netwww.iss.net October 2006 #12 Risk Index ..............................................11 Future X-Force Threat Insight Quarterly Internet Security Systems X-Force® Threat Insight Quarterly > October 2006 ©2006 Internet Security Systems

29

Threat Insight Quarterly Browser Exploitation  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Browser Exploitation www.iss.netwww.iss.net January 2007 #12 . . . . . . . . . . . . . . . . . . . . . . . . 11 Previous X-Force Threat Insight Quarterly Topics . . . . . . . . . . 15 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Contents IBM Internet Security Systems X-Force® Threat Insight Quarterly > January 2007

30

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

June 2010 DOE/EIA-0121 (2010/01Q) June 2010 DOE/EIA-0121 (2010/01Q) Revised: July 2012 Quarterly Coal Report January - March 2010 June 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.gov/coal/production/quarterly/ _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of

31

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Quarterly Coal Report January - March 2008 July 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

32

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2009 September 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

33

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

7/01Q) 7/01Q) Quarterly Coal Report January - March 2007 June 2007 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

34

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2008 December 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

35

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2008 September 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

36

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

8/04Q) 8/04Q) Quarterly Coal Report October - December 2008 March 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

37

NERSC Hopper Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Hours Used Hopper Hours Used 2014 Hopper Usage Chart Hopper Usage Chart 2013 Hopper Usage Chart Hopper Usage Chart 2012 Hopper Usage Chart Hopper Usage Chart 2011 Hopper Usage...

38

A quarterly and Central  

E-Print Network (OSTI)

A quarterly report on employment and office markets in Northern and Central New Jersey May 2008- plications for the state's office markets. This year has every indication of being a very difficult capacity. Along with the ongoing Portfields Initiative project, the Port of New York and New Jersey

39

QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the

40

QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) 1991 3 QUARTER SHORT-T ERM ENERGY OUTLOO K QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1991 This publication may be purchased from the Superintenden t of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunica tions device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunic ations Device for the

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

U.S. Energy Information Administration | Quarterly Coal Distribution...  

Annual Energy Outlook 2012 (EIA)

1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2014 Alabama ...

42

Program Update: 3rd Quarter 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Program Update: 3rd Quarter 2012 Inside this Update: LM Co-Hosts International Workshop on Uranium Legacy Sites; LM Communication and Stakeholder Satisfaction Independent Survey; LM Conducts Groundwater and Soil Investigation at Riverton, Wyoming, in Response to 2010 Flood; LM's First Year with the Title X Uranium/Thorium Reimbursement Program; DOE and Colorado Mesa University Education Agreement Expands LM's Site Reuse Portfolio; Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

43

EMSL Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

th Quarter, Fiscal Year 2008 th Quarter, Fiscal Year 2008 (July 1, 2008, through September 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by

44

High Hopes, Tight Quarters  

NLE Websites -- All DOE Office Websites (Extended Search)

Hopes, Hopes, Tight Quarters Unique Recycler, world's largest array of permanent magnets, taking shape in crowded Main Injector tunnel. by Mike Perricone, Office of Public Affairs The magnets are numbered in the hundreds; their weight is measured in tons. The available space in the tunnel is usually about four and a half feet, but it can be as little as two or three inches, and the forklifts doing the moving have been custom- designed for these tight quarters. The obstacles include water systems, cable trays, workers performing other installations, and the precisely aligned components of the signature Main Injector accelerator. The consequences of a possible slip-up: Don't even ask. Installation crews can put eight to 10 magnets in place in a day, if the magnets are located close together. Installing a magnet

45

Fourth Quarter FY 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2009 1 December 2009 1 Fourth Quarter FY 2009 December 1, 2009; Issue No. 61 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 8) DOE Begins Online Posting of Categorical Exclusion Determinations The Department of Energy (DOE) is now posting most of its categorical exclusion (CX) determinations on the web under a policy that went into effect November 2, 2009. In establishing the policy, Deputy Secretary Daniel B. Poneman referred to President Obama's commitment to "creating an unprecedented level of openness in Government," including by posting information online. "Such openness is especially important when the information relates to the Department's

46

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

Not Available

1990-08-15T23:59:59.000Z

47

FALL AND SPRING Per Hour # Hours # Semesters Total  

E-Print Network (OSTI)

$4,060.00 FALL AND SPRING Per Hour # Hours # Semesters Total Tuition $828.00 15 2 $24,840.00 ISS Living Expenses Please see reverse side for Architecture, Arts, Business, Design & Planning, Engineering to change. Tuition will be guaranteed through spring 2018; however, expect approximately a 5% increase each

48

NERSC Franklin Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Franklin Hours Used Franklin Hours Used Franklin Hours Used 2011 Franklin Usage in Hours 2011 Franklin Usage in Hours 2010 2010 Franklin Usage in Hours 2009 2009 Franklin Usage in Hours 2007-2008 2008 Franklin Usage in Hours 2008 Franklin Usage in Hours Date Hours Used (in thousands) Percentage of Maximum Possible (24 hours/day) 04/28/2012 0.00 0.00 04/27/2012 272.62 29.40 04/26/2012 692.81 74.71 04/25/2012 841.60 90.75 04/24/2012 53.86 5.81 04/23/2012 432.01 46.59 04/22/2012 823.23 88.77 04/21/2012 473.95 51.11 04/20/2012 173.75 18.74 04/19/2012 449.22 48.44 04/18/2012 816.23 88.02 04/17/2012 754.35 81.34 04/16/2012 648.89 69.97 04/15/2012 812.25 87.59 04/14/2012 843.46 90.95 04/13/2012 737.46 79.52 04/12/2012 711.97 76.77 04/11/2012 734.65 79.22 04/10/2012 815.65 87.95 04/09/2012 897.25 96.75

49

Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Cybersecurity Awareness Campaigns and Toolkits Quarterly Cybersecurity Awareness Campaigns and Toolkits The OCIO coordinates a variety of internal cybersecurity awareness...

50

INCITE Quarterly Report Policy | Argonne Leadership Computing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tukey Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job...

51

Threat Insight Quarterly Wireless Technology  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Wireless Technology April 2006 #12;X - F O R C E T H R E A T I N the Wireless Threat ..................................................3 Wireless Threats-Force Catastrophic Risk Index...................................... 13 Future X-Force Threat Insight Quarterly Topics

52

Stockpile Stewardship Quarterly  

National Nuclear Security Administration (NNSA)

1, Number 3 * October 2011 1, Number 3 * October 2011 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Comments Questions or comments regarding the Stockpile Stewardship Quarterly should be directed to Terri.Batuyong@nnsa.doe.gov Technical Editor: Chris Werner, Publication Editor: Millicent Mischo Defense Programs Stockpile Stewardship in Action Volume 1, Number 3 Inside this Issue 2 Simulation: A Window into the Detonation of High Explosives 3 Modeling of High-Explosive Detonation Performance 5 The Detonation Sandwich 6 Joint DoD/DOE Munitions Technology Development Program-High Explosives 9 New Faces at the Office of Stockpile Stewardship

53

quarterly report- Jan03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Inspector General's Message 1 Top Management Challenges 2 Inadequate Controls in Unclassified Foreign Visits and Assignments Program 2 Nuclear Safety Improvements Needed at the Department's Ashtabula Site 3 Improvements Needed in the Department's Explosive Safety Program 3 Domestic Calutron Isotope Production Capabilities 4 Chiropractor Pleads Guilty to Improper Billing at Hanford 4 Contractor Employee Sentenced for Possession of Child Pornography on a Government Computer 3 Improvements Needed in Business Management Information System Greg Friedman The Office of Inspector General (OIG) is pleased to provide its Quarterly Report to the Secretary as well as the members of the Congress. This report summarizes significant audit, investigation, and

54

EIA-930 Hourly and Daily Balancing ...  

Annual Energy Outlook 2012 (EIA)

not change from day-to-day or hour-to-hour, as specified in the immediately preceding section. For each hour of the day, hourly integrated demand is to be posted within ten...

55

Quarterly coal report, July--September 1997  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

NONE

1998-02-01T23:59:59.000Z

56

Natural Gas Imports and Exports Third Quarter Report 2013 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports Third...

57

Natural Gas Imports and Exports - First Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report 2012 Natural Gas Imports and Exports - First Quarter Report...

58

Natural Gas Imports and Exports - Second Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports...

59

Natural Gas Imports and Exports - Second Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report...

60

Natural Gas Imports and Exports - Third Quarter Report 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Natural Gas Imports and Exports - Third Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report...

62

Natural Gas Imports and Exports - Second Quarter Report 2013...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and...

63

Natural Gas Imports and Exports Second Quarter Report 2014 |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Second Quarter Report 2014 Natural Gas Imports and Exports Second Quarter Report 2014 Natural Gas Imports and Exports Second Quarter Report 2014 Natural Gas Imports and Exports...

64

Natural Gas Imports and Exports Fourth Quarter Report 2013 |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2013 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports...

65

Natural Gas Imports and Exports - Fourth Quarter Report 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports...

66

Natural Gas Imports and Exports First Quarter Report 2014 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter Report 2014 Natural Gas Imports and Exports First Quarter Report 2014 Natural Gas Imports and Exports First Quarter Report 2014 Natural Gas Imports and Exports First...

67

Natural Gas Imports and Exports - First Quarter Report 2011 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report 2011 Natural Gas Imports and Exports - First Quarter Report...

68

Natural Gas Imports and Exports - Fourth Quarter Report 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report...

69

Natural Gas Imports and Exports - First Quarter Report 2013 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report...

70

Overview of the Third Quarter 2014 Surveillance and Maintenance...  

Office of Legacy Management (LM)

8 8 Third Quarter 2014 Groundwater Monitoring and Operations RFLMA Monitoring Light sampling quarter * 10 RCRA wells (quarterly) Statistical evaluation of results...

71

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . National Environmental Policy Act N E P . A LESSONS Office of NEPA LEARNED QUARTERLY REPORT 1ST QUARTER FY 1995 Policy and Assistance U.S. Department of Energy March 1,1995 ODU- To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment Safety and Health to solicit comments from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the process, and to distribute a quarterly summary to all,NEPA Compliance Officers and NEPA Document Managers. This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised

72

EMSL Quarterly Highlights Report 2nd Quarter FY08  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Highlights Report: 2 Quarterly Highlights Report: 2 nd Quarter, FY08 1 The W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Users are participants on accepted proposals. Staff members work with users to expedite access. The EMSL Quarterly Highlights Report documents research and activities of EMSL staff and users. Research Highlights Atmospheric Aerosol Chemistry

73

PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993  

SciTech Connect

This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Not Available

1993-10-01T23:59:59.000Z

74

NEPA Lessons Learned Quarterly Report, Fourth Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 Fourth Quarter FY 2006 December 1, 2006; Issue No. 49 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 6) Scoping Process Underway for Two Yucca Mountain EISs The Department of Energy (DOE) recently initiated public scoping for two EISs related to Yucca Mountain, the Nation's proposed repository for disposal of commercial

75

NEPA Lessons Learned Quarterly Report, Second Quarter FY 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 1 7 1 Second Quarter FY 2007 June 1, 2007; Issue No. 51 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A We have all been told to "work together" to accomplish a particular goal. Together Everyone Achieves More illustrates the benefi ts of "teamwork." Federal agencies, including the Council on Environmental Quality

76

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Distribution Category UC-950 Quarterly Coal Report April-June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed to Paulette Young at (202) 426-1150, email

77

SPEAR 3 Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

through December through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management Control System (PMCS) area is now headed by Steve McNiel who replaces Teri Knight. Teri has helped set-up the PMCS operation and reporting system over the last year and we deeply appreciate her efforts. Both Steve and Teri have the experience of utilizing the Primavera/Cobra system for tracking and

78

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of B.D. Hong, Leader, Coal Infor- mation Team, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section should be directed

79

NERSC Carver Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Carver Hours Carver Hours Used Carver Hours Used Hopper Usage Chart Hopper Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 01/05/2014 170.00 89.35 01/04/2014 174.38 91.65 01/03/2014 174.15 91.53 01/02/2014 179.72 94.45 01/01/2014 173.76 91.32 12/31/2013 172.25 90.53 12/30/2013 169.62 89.14 12/29/2013 164.72 86.57 12/28/2013 177.92 93.51 12/27/2013 171.61 90.19 12/26/2013 172.74 90.79 12/25/2013 172.13 90.46 12/24/2013 173.48 91.18 12/23/2013 174.92 91.93 12/22/2013 175.26 92.11 12/21/2013 173.58 91.23 12/20/2013 174.50 91.71 12/19/2013 170.02 89.36 12/18/2013 178.25 93.68 12/17/2013 176.17 92.59 12/16/2013 162.03 85.16 12/15/2013 157.09 82.56 12/14/2013 173.40 91.13 12/13/2013 185.02 97.24 12/12/2013 150.91 79.31 12/11/2013 31.67 16.64 12/10/2013 92.44 48.58

80

Quarterly coal report, April--June 1997  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1997-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

AE: Office Supplies Purchasing Stakeholder Survey Notes  

E-Print Network (OSTI)

AE: Office Supplies Purchasing Stakeholder Survey Notes Updated: 2/20/2012 Overview: · Survey Purchasing Factors: · 37% of people make office supplies purchases monthly, 26% weekly, and 15% quarterly used vendors for office supplies · People mostly purchase from vendors other than Staples due

Sheridan, Jennifer

82

Location and Hours | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Location and Hours Location The ORNL Research Library is located off the central corridor of Bldg. 4500N on the main ORNL campus. Hours The library is open 24 hours, seven days a...

83

hourly data | OpenEI  

Open Energy Info (EERE)

data data Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. Source U.S. National Renewable Energy Laboratory (NREL) Date Released May 03rd, 2005 (9 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DNI GHI hourly data NREL solar Sri Lanka SWERA TILT TMY UNEP Data application/zip icon Download TMY data (zip, 67.5 MiB)

84

NEPA Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEARNED LEARNED LESSONS N E P A Inside LESSONS LEARNED March 1, 1996 Quarterly Report LESSONS LEARNED National Environmental Policy Act U.S. Department of Energy Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPA- related information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: * NEPA lessons learned at the Hanford Site - Page 1 * Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers - Pages 3-6 * Updates on the proposed amendments to DOE's NEPA

85

Quarterly Coal Distribution Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Distribution Report Quarterly Coal Distribution Report Release Date: October 01, 2013 | Next Release Date: January 3, 2014 | full report The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding "Annual Coal Distribution Report." Highlights for the second quarter 2013: Total domestic coal distribution was an estimated 205.8 million short tons (mmst) in the second quarter 2013. This value is 0.7 mmst (i.e. 0.3 percent) higher than the previous quarter and 6.3 mmst (i.e. 3.1 percent) higher than the second quarter of 2012 estimates.

86

FTCP Quarterly Indicator Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistance » Federal Technical Capability Program » Assistance » Federal Technical Capability Program » FTCP Quarterly Indicator Reports FTCP Quarterly Indicator Reports November 20, 2013 FTCP Quarterly Report on Federal Technical Capability, November 20, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls. August 16, 2013 FTCP Quarterly Report on Federal Technical Capability, August 16, 2013 This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis.

87

Short-term energy outlook: Quarterly projections, second quarter 1997  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

NONE

1997-04-01T23:59:59.000Z

88

Quarterly coal report, July--September 1998  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1998 and aggregated quarterly historical data for 1992 through the second quarter of 1998. 58 tabs.

NONE

1999-02-01T23:59:59.000Z

89

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production...

90

Program Update: 1st Quarter 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Program Update: 1st Quarter 2012 Inside this Update: Interagency Working Group Collaborates on Codisposal of Uranium Mine and Mill Tailings Waste in New Mexico; Atomic Energy of Canada Limited Benchmarking Visit to the LMBC; LM Creates Cooperative Agreement with the Northern Arapaho Tribe; LM Participates in 2012 WM Conference; M Partners with Diné Environmental Institute on Remediation of Uranium Processing Sites; LM Stakeholder Survey 2012 Update; LM: LEEDing the Way; Yucca Mountain Transition Progress - Congressional Interest; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time. Office of Legacy Management (LM) Program Update, January-March 2012

91

Definition: Kilowatt-hour | Open Energy Information  

Open Energy Info (EERE)

Kilowatt-hour Kilowatt-hour Jump to: navigation, search Dictionary.png Kilowatt-hour A unit of measure for energy, typically applied to electricity usage; equal to the amount of energy used at a rate of 1,000 watts over the course of one hour. One kWh is equivalent to 3,412 Btu, or 3,600 kJ.[1][2] View on Wikipedia Wikipedia Definition The kilowatt hour, or kilowatt-hour, (symbol kW·h, kW h or kWh) is a unit of energy equal to 1000 watt hours or 3.6 megajoules. For constant power, energy in watt hours is the product of power in watts and time in hours. The kilowatt hour is most commonly known as a billing unit for energy delivered to consumers by electric utilities. Also Known As kWh Related Terms British thermal unit, Electricity, Energy, Kilowatt, energy, electricity generation

92

Short-term energy outlook quarterly projections. First quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

Not Available

1994-02-07T23:59:59.000Z

93

Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

Not Available

1993-11-05T23:59:59.000Z

94

Quarterly coal report, April--June, 1998  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1998 and aggregated quarterly historical data for 1992 through the first quarter of 1998. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. 58 tabs.

NONE

1998-11-01T23:59:59.000Z

95

Quarterly coal report, October--December 1998  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1998 and aggregated quarterly historical data for 1992 through the third quarter of 1998. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. 58 tabs.

NONE

1999-07-01T23:59:59.000Z

96

Quarterly coal report, January--March 1998  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for January through March 1998 and aggregated quarterly historical data for 1992 through the fourth quarter of 1997. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the United States, historical information has been integrated in this report. 58 tabs.

NONE

1998-08-01T23:59:59.000Z

97

Form EIA-930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

930 930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT INSTRUCTIONS Due Date: mm/dd/yyyy Approved: OMB No. 1905-0129 Approval Expires: 10/31/2016 Burden: 0.19 hours Page 1 Draft for Discussion only PURPOSE Form EIA-930 requires Internet posting of hourly balancing authority operating data. The posted data are used to monitor the current status and trends of the electric power industry, and to support enhancement of electric system operations. REQUIRED RESPONDENTS For the contiguous United States: all entities that are listed in NERC's Compliance Registry as a balancing authority must post balancing authority operating information required by this survey. Other than the Midwest ISO (MISO), registered balancing authorities that are parties

98

Threat Insight Quarterly Vulnerability Management  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Vulnerability Management July 2006 #12;X - F O R C E T H R E.................. 7 X-Force Catastrophic Risk Index.............................. 10 Future X-Force Threat Insight Introduction There is a wide range of threats that can exist in any network. The presence of unpatched

99

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPTEMBER 1998 1 SEPTEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT DOE NEPA Community to Meet in October For Third Quarter FY 1998 September 1, 1998, Issue No. 16 On October 14 and 15, 1998, the DOE NEPA Community will meet in North Las Vegas, hosted by the Nevada Operations Office at its new Support Facility. The Office of NEPA Policy and Assistance is sponsoring this meeting to improve DOE NEPA performance through sharing of lessons learned and discussion of current issues. Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process The meeting will focus on issues that NEPA Document Managers face daily: What tools and techniques can help

100

NEPA Lessions Learned Quarterly Report - 4th Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECEMBER 1998 DECEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1998 December 1, 1998, Issue No. 17 New and Improved NEPA Compliance Guide Issued in 2 Volumes A new and improved DOE NEPA Compliance Guide, issued by the Office of Environment, Safety and Health, has been distributed to about 750 members of the DOE NEPA Community. Intended to foster sound and efficient NEPA compliance, the Compliance Guide is a collection of resources and references to aid in NEPA document preparation and other aspects of the NEPA process. Volume I, General NEPA References, contains the statute, and regulations and guidance from the Council on Environmental Quality, the Department of State, and the

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 1999 March 1, 1999; Issue No. 18 continued on page 3 Dr. David Michaels, new Assistant Secretary for Environment, Safety and Health, enthusiastically supports the Lessons Learned approach. Dr. David Michaels — DOE’s New Leader for Environment, Safety and Health The new Assistant Secretary for Environment, Safety and Health, Dr. David Michaels, recognizes the value of NEPA in supporting good decisions. “I understand the importance of examining options carefully before we make decisions that will affect our workers, the public, and the environment in lasting and profound ways,” he said. “We must be fully informed of the environmental

102

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1999 September 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 1999 September 1, 1999; Issue No. 20 Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis By: Ellen Russell, NEPA Document Manager, Fossil Energy with Carolyn Osborne, Office of NEPA Policy and Assistance continued on page 3 Fossil Energy (FE) is preparing an environmental impact statement (EIS) for what would be the first cross-border high-voltage transmission project to connect the main power delivery systems of the United States and Mexico (DOE/EIS-0307). EIS scoping has been complex. Through the scoping process, FE has identified and worked with many stakeholders to define a broad range

103

NEPA Lessons Learned Quarterly Report - 1st Quarter FY2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2000 March 1, 2000; Issue No. 22 Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources continued on page 4 By: Thomas W. Ferns, NEPA Document Manager, Richland Operations Office, and Yardena Mansoor, Office of NEPA Policy and Assistance A 50-year land-use plan for the Hanford Site? Some said it couldn't be done. Too many factions, they said, with irreconcilably different visions for the future. Would NEPA be a help or a hindrance in developing such a land-use plan? It turns out that the Hanford Comprehensive Land-Use Plan EIS Record of Decision (ROD) (64 FR 61615; November 12, 1999) marks the end of a successful, albeit

104

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1999 December 1999 1 continued on page 3 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1999 December 1, 1999; Issue No. 21 Good Information, Good Government Using Technology to Improve NEPA Decisionmaking provides a comprehensive guide to Federal environmental information resources available electronically and to useful Web sites provided by nongovernmental groups and professional organizations. “One of the foundations of good government is good information,” President Clinton observed. NEPA is “at its core, a mandate for informed, democratic decisionmaking. And its contribution to environmental protection is incalculable.” Managing a National Public Participation

105

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decisionmakers Decisionmakers States/Local Governm ents Agencies Academ icians Congress Framers of NEPA Drafters of CEQ Regs Native Am erican Tribes La wyers NGOs/ Citizen Groups Businesses Council on Environmental Quality NEPA Effectiveness Study Partners continued next page -- Improved Implementation Needed -- -- DOE Leadership Highlighted -- CEQ Study: NEPA a "Success" Overall National Environmental Policy Act N E P A U.S. Department of Energy Quarterly Report LESSONS LEARNED LESSONS LEARNED For First Quarter FY 1997 March 3, 1997 The President's Council on Environmental Quality (CEQ) issued in January the results of its extensive study on the effectiveness of the National Environmental Policy Act during the statute's 25-year history. From the cover letter by CEQ Chair Kathleen McGinty to its four short appendices, the 50-page booklet entitled The National Environmental

106

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1998 1 March 1998 1 continued on page 2 For First Quarter FY 1998 March 2, 1998, Issue No. 14 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Managing Progress on the Repository EIS How to Move a Mountain Tour members approach the entry to the Yucca Mountain Exploratory Studies Facility. The EIS Management Council, along with members and technical advisors of the EIS Preparation Team, visited the site in January while participating in briefings on technical, legal, and policy issues. How do you manage preparation of a major EIS that is important to five Program Offices, four Field Offices, and other Federal agencies, not to mention a wide array of stakeholders? How do you address extremely complex and

107

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1994  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LESSONS LEARNED QUARTERLY REPORT 4TH QUARTER FY1994 Oflicx of NEPA Oversight U.S. Department of Energy December ~ 1994 INTRODUCTION . To fdster continuing improvementof the Department's National Environmental policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEP& issued June 13, 1994, requires the OffIceof Environment StUetyand Health to soiicit comments tkom the NEPA Document Manager, the NEPA Compliance Offker, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the proces~ and to distribute a -Y SUmmW tOall NEpA Gmplf-c Offfcem and NEPA Document Managem On August Q 1994 the Oftice of NEPA Oversight distributed an interhddraft kSSOI.W ]WImed questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments approvedbetween

108

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1999 June 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 1999 June 1, 1999; Issue No. 19 continued on page 6 NEPA and Habitat Management Plan: Environmental Synergy By: Elizabeth Withers, NEPA Compliance Officer, Los Alamos Area Office, with John Stetson, Pacific Western Technologies, Ltd. On the day DOE issued the Draft EIS for the Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility at Los Alamos National Laboratory (LANL), LANL biologists discovered a nesting pair of Mexican spotted owls (Strix occidentalis lucida) – which had only recently been listed as threatened – in the canyons directly below the proposed site. Today, this nest site, at the edge

109

Quarterly coal report, January--March 1997  

SciTech Connect

This Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience,including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1997 and aggregated quarterly historical data for 1991 through the fourth quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

NONE

1997-08-01T23:59:59.000Z

110

Quarterly coal report, October--December 1997  

SciTech Connect

The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

NONE

1998-05-01T23:59:59.000Z

111

ASCeNews - Quarterly Newsletter  

National Nuclear Security Administration (NNSA)

December 2010 - NA-ASC-500-10 - Issue 15 December 2010 - NA-ASC-500-10 - Issue 15 1 ASCeNews - Quarterly Newsletter December 2010 - NA-ASC-500-10 - Issue 15 Meisner Minute I hope this quarter's newsletter finds you and your families looking forward to a healthy and prosperous new year. And, professionally, I hope your achievements in the New Year exceed those of a very successful 2010. In spite of presenting you with impediments such as continuing resolutions, your accomplishments are nothing short of amazing. So, I would like to take the time to recount your successes as a challenge for the New Year. This past year culminated several years of hard work on the Energy Balance knob. For the first time brilliant minds, unprecedented experimental facilities and world-leading simulation capabilities converged at a point in

112

Natural Gas Imports and Exports - Quarterly Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Imports and Natural Gas Imports and Exports - Quarterly Reports Natural Gas Imports and Exports - Quarterly Reports September 13, 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports - Second Quarter Report 2013 July 1, 2013 Natural Gas Imports and Exports - First Quarter Report 2013 Natural Gas Imports and Exports - First Quarter Report 2013 March 29, 2013 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 December 31, 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2012 September 28, 2012 Natural Gas Imports and Exports - Second Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2012

113

3rd Quarter 2014 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

of ore per day)",2013,"1st quarter 2014","2nd quarter 2014","3rd quarter 2014" "EFR White Mesa LLC","White Mesa Mill","San Juan, Utah",2000,"Operating-Processing Alternate...

114

3rd Quarter 2014 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

2nd quarter 3rd quarter 4th quarter P Preliminary data. Source: U.S. Energy Information Administration: Form EIA-851A and Form EIA-851Q, "Domestic Uranium Production Report."...

115

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2002 Lessons Learned Quarterly Report, March 2002 Welcome to the 30th quarterly report on lessons learned in the NEPA process. December 5, 2001 Lessons Learned Quarterly...

116

Natural Gas Imports and Exports - Third Quarter Report 2014 ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Third Quarter Report 2014 Natural Gas Imports and Exports - Third Quarter Report 2014 Natural Gas Imports and Exports - Third Quarter Report 2014 3rd14ng.pdf More Documents &...

117

"NATURAL GAS PROCESSING PLANT SURVEY"  

U.S. Energy Information Administration (EIA) Indexed Site

0.5 hours" "NATURAL GAS PROCESSING PLANT SURVEY" "FORM EIA-757" "Schedule A: Baseline Report " "This report is mandatory under the Federal Energy Administration Act of 1974 (Public...

118

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

Not Available

1991-08-15T23:59:59.000Z

119

Quarterly coal report, January--March 1996  

SciTech Connect

This report presents detailed quarterly data for March 1996 and historical data for 1988 through 1995 on coal production, distribution, imports and exports, prices, consumption, and stocks.

NONE

1996-08-01T23:59:59.000Z

120

Quarterly Nuclear Deployment Scorecard - April 2014 | Department...  

Energy Savers (EERE)

April 2014 Quarterly Nuclear Deployment Scorecard - April 2014 News Updates On February 20, Secretary Moniz announced the issuance of loan guarantees totalling approximately 6.5...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Quarterly Nuclear Deployment Scorecard - July 2014 | Department...  

Office of Environmental Management (EM)

July 2014 Quarterly Nuclear Deployment Scorecard - July 2014 News Updates * The NRC Atomic Safety and Licensing Board (ASLB) has ruled that Toshiba's participation in Nuclear...

122

Lessons Learned Quarterly Report, December 2014  

Energy.gov (U.S. Department of Energy (DOE))

Welcome to the 81st quarterly report on lessons learned in the NEPA process. This issue features tools to help NEPA practitioners perform NEPA reviews.

123

NEAMS Quarterly Report April-June 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights,a spotlight on personal achievements, accomplishments, milestones and a technical spotlight on...

124

Stockpile Stewardship Quarterly Newsletter | National Nuclear...  

National Nuclear Security Administration (NNSA)

Development, Test and Evaluation, debuted in February 2011. Formerly, the Defense Science Quarterly newsletter, which covered the activities of the Science Campaign, the...

125

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

science-based stockpile stewardship program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

126

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

Science-Based Stockpile Stewardship Program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

127

Lessons Learned Quarterly Report, December 2014 | Department...  

Energy Savers (EERE)

Assessment Report Transitions Give NEPAnode a Try Environmental Questionnaire Sustainability Rating System EAs and EISs Completed This Quarter Cost and Time Facts New NEPA...

128

Program Update: 4th Quarter 2010  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

129

Program Update: 1st Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

130

Program Update: 2nd Quarter 2010  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

131

Program Update: 4th Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

132

Program Update: 3rd Quarter 2011  

Energy.gov (U.S. Department of Energy (DOE))

The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time.

133

Lessons Learned Quarterly Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Lessons Learned Quarterly Report Lessons Learned Quarterly Report Lessons Learned Quarterly Report DOE's NEPA Lessons Learned Program was initiated in 1994 to foster continuous improvement in NEPA compliance by measuring DOE NEPA performance and gathering information learned through NEPA experience. The Program collects and publishes time and cost metrics to help DOE objectively focus on controlling these aspects of its NEPA compliance, and disseminates information broadly relevant to NEPA implementation, such guidance on public participation and interagency coordination procedures. The keystone of DOE's NEPA Lessons Learned Program is the Lessons Learned Quarterly Report (LLQR). The LLQR is produced as a means of disseminating NEPA program metrics, along with related guidance, case studies, analysis,

134

NNSA Defense Programs Announces Quarterly Awards | National Nuclear...  

National Nuclear Security Administration (NNSA)

NNSA Production Office NPO News Releases NNSA Defense Programs Announces Quarterly Awards NNSA Defense Programs Announces Quarterly Awards applicationmsword icon NR-02-16.doc...

135

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

feraci.pdf More Documents & Publications Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May...

136

Quarterly Biomass Program/Clean Cities States Web Conference...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Quarterly Biomass ProgramClean Cities States Web Conference: January 21, 2010 Presentation from the...

137

Automotive Stirling Engine Development Program. Quarterly technical progress report for period June 29-October 3, 1980  

SciTech Connect

Current information on component and subsystems development activities and engine and vehicle testing during July to October 1980 in the Automotive Stirling Engine Development Program is reported. Computer code development progress is also covered. The status of the manufacture of the Mod I is given in some detail. Program engine operating hours through the end of this quarterly period reach a total of 6181 h.

Not Available

1980-12-01T23:59:59.000Z

138

Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Success Stories: Success Stories: Articles from Department of Energy NEPA Lessons Learned Quarterly Reports 1996 Mar Hanford Tanks Public participation in NEPA process resulted in changes to the scope of the proposed project. The NEPA process resulted in enforceable mitigation commitments. 1997 Dec NPR Sale The NEPA process resulted in enforceable mitigation commitments for biological and cultural resources. 1999 Mar SPR Pipeline Integrating NEPA and the Section 404 permit processes proved efficient and resulted in mitigation commitments. 1999 Jun LANL Habitat Plan The NEPA process resulted in a site-wide habitat management plan (reducing future need for biological assessments), geographic information system (reference for future project analyses), and endangered species protection.

139

Short-term energy outlook. Quarterly projections, Third quarter 1994  

SciTech Connect

The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

Not Available

1994-08-02T23:59:59.000Z

140

Information and Instructions for Your Office Hours  

E-Print Network (OSTI)

Aug 7, 2014 ... INFORMATION on OFFICE HOURS and INSTRUCTIONS for TAOH. Please view rather than print this information. Current dates can be found...

Dominic Naughton

2014-08-07T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

NEPA Lessons Learned Quarterly Report. December 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 More Inside on NEPA 35 CEQ Chairman Connaughton's Address ......... 5 Plenary Sessions.............................................. 6 Training Sessions .......................................... 14 Breakout Sessions ......................................... 15 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2005 December 5, 2005; Issue No. 45

142

Domestic Uranium Production Report - Quarterly - Energy Information  

U.S. Energy Information Administration (EIA) Indexed Site

All Nuclear Reports All Nuclear Reports Domestic Uranium Production Report - Quarterly Data for 3rd Quarter 2013 | Release Date: October 31, 2013 | Next Release Date: February 2014 | full report Previous Issues Year: 2013-Q2 2013-Q1 2012-Q4 2012-Q3 2012-Q2 2012-Q1 2011-Q4 2011-Q3 2011-Q2 2011-Q1 2010-Q4 2010-Q3 2010-Q2 2010-Q1 2009-Q4 2009-Q3 2009-Q2 2009-Q1 2008-Q4 2008-Q3 2008-Q2 2008-Q1 Go 3rd Quarter 2013 U.S. production of uranium concentrate in the third quarter 2013 was 1,171,278 pounds U3O8, down 16 percent from the previous quarter and up 12 percent from the third quarter 2012. Third quarter 2013 uranium production is at its highest level since 1999. During the third quarter 2013, U.S. uranium was produced at six U.S. uranium facilities. U.S. Uranium Mill in Production (State)

143

Quarterly coal report, April-June 1987  

SciTech Connect

The Quarterly Coal Report provides comprehensive information about coal production, exports, imports, receipts, consumption, and stocks in the United States to a wide audience, including Congress, federal and state agencies, the coal industry, and the general public. The data presented in this report were collected and published by the Energy Information Administration (EIA) to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (PL 93-275) as amended. This issue shows detailed quarterly data for April through June 1987, aggregated quarterly historical and projected data for 1980 through 1988, and aggregated annual historical and projected data for 1960 through 2000. Appendix C shows detailed quarterly historical data since 1980 on coal imports, as specified in the National Coal Imports Reporting Act of 1985, Title II of the Energy Policy and Conservation Amendments Act of 1985 (PL 99-58). Appendix D presents selected quarterly tables converted to metric tons.

Not Available

1987-10-29T23:59:59.000Z

144

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2001 June 1, 2001 Lessons Learned Quarterly Report, June 2001 Welcome to the 27th quarterly report on lessons learned in the NEPA process. March 1, 2001 Lessons Learned Quarterly Report, March 2001 Welcome to the 26th quarterly report on lessons learned in the NEPA process. December 1, 2000 Lessons Learned Quarterly Report, December 2000 Welcome to the 25th quarterly report on lessons learned in the NEPA process. September 1, 2000 Lessons Learned Quarterly Report, September 2000 Welcome to the 24th quarterly report on lessons learned in the NEPA process. Note that this issue includes a cumulative index covering the past six years of reports. June 1, 2000 Lessons Learned Quarterly Report, June 2000 Welcome to the 23rd quarterly report on lessons learned in theNEPA process.

145

Office of Survey Development and Statistical Integration  

U.S. Energy Information Administration (EIA) Indexed Site

Steve Harvey Steve Harvey April 27, 2011 | Washington, D.C. Tough Choices in U.S. EIA's Data Programs Agenda * Office of Oil, Gas, and Coal Supply Statistics * Office of Petroleum and Biofuels Statistics * Office of Electricity, Renewables, and Uranium Statistics * Office of Energy Consumption and Efficiency Statistics * Office of Survey Development and Statistical Integration 2 Presenter name, Presentation location, Presentation date Coal Data Collection Program 3 James Kendell Washington, DC, April 27, 2011 Quarterly Coal Consumption and Quality Report, Manufacturing and Transformation/Processing Coal Plants and Commercial and Institutional Coal Users EIA-3 Quarterly Coal Consumption and Quality Report - Coke Plants EIA-5 Coal Production and Preparation

146

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1997 December 1997 1 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED For Fourth Quarter FY 1997 December 1, 1997, Issue No. 13 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT continued on page 2 I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£ I@Q6£Sr‰vr£6qq†£W W W W Whyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq hyˆr£‡‚£Q…‚ƒ‚†rq Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r Thyr£‚s£Ih‰hy£Qr‡…‚yrˆ€£Sr†r…‰r The endangered San Joaquin Kit Fox would continue to be protected after sale of NPR-1. (Photo courtesy of

147

Electric Power Quarterly, October-December 1984  

SciTech Connect

The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1985-04-01T23:59:59.000Z

148

Electric Power Quarterly, January-March 1986  

SciTech Connect

The ''Electric Power Quarterly (EPQ)'' provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The ''EPQ'' contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1986-07-21T23:59:59.000Z

149

Electric Power Quarterly, July-September 1984  

SciTech Connect

The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1985-01-01T23:59:59.000Z

150

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

Not Available

1994-02-16T23:59:59.000Z

151

U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 1st Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 807 158 282 - 1,247 Alabama Railroad 449 71 14 - 534 Alabama River 358 - - - 358 Alabama Truck - 87 267 - 354 Colorado Total 204 - - - 204 Colorado Railroad

152

NEPA Lessons Learned Quarterly Report, First Quarter FY 2005 (March 1, 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 Green Book, Second Edition, Issued; see page 4 New Assistant Secretary Shaw Promotes NEPA as Essential to Energy Mission and Goals National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2005 March 1, 2005; Issue No. 42 LESSONS LEARNED LEARNED LESSONS (continued on page 3) In a recent interview for Lessons Learned Quarterly Report, John Spitaleri Shaw, the new Assistant Secretary for

153

Northeast regional biomass program. First quarter report, October--December 1993  

SciTech Connect

This progress report presents summaries of various projects which were in operation or being planned during this quarter period. Projects included testing the efficiency of using wood chips as fuel in heating systems, barriers to commercial development of wood pellet fuels, studies of more efficient and less polluting wood stoves, work on landfill gas utilization, directories of facilities using biomass fuels, surveys of biomass conversion processes to liquid fuels, for commercial development, etc.

NONE

1994-05-01T23:59:59.000Z

154

Bradbury Science Museum announces winter opening hours  

NLE Websites -- All DOE Office Websites (Extended Search)

Bradbury Science Museum winter hours Bradbury Science Museum winter hours Bradbury Science Museum announces winter opening hours Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). December 21, 2010 Bradbury Science Museum Bradbury Science Museum Contact Communications Office (505) 667-7000 Often called "a window to the Laboratory," the museum annually attracts thousands of visitors from all over the world. LOS ALAMOS, New Mexico, December 21, 2010-Los Alamos National Laboratory's Bradbury Science Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). On all other days, the museum will observe regular opening hours: from 10 a.m. to 5 p.m. Tuesdays to Saturdays, and from 1 to 5 p.m. Sundays and Mondays. Often called "a window to the Laboratory," the museum annually attracts

155

dgw_cmod_quarterly.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

C-Mod Quarterly Oct 2010 FY2010 Plain English Milestone Accomplished Fuel retention in refractory metals * Tritium fuel retention is an important issue for ITER and reactors, since the on- site inventory of tritium is restricted by safety considerations. * In addition, the high neutron fluence environment of a reactor necessitates the use of tungsten as the first-wall tile material. * Initial experiments have revealed a higher-than-expected level of fuel retention in C-Mod's molybdenum and tungsten tiles compared to laboratory studies. It has been proposed that when such tiles are exposed to C-Mod's high plasma particle fluxes, they experience damage deep within the material, forming 'traps' that can enhance fuel retention. * Experiments will be performed to quantify the level of fuel retention in C-

156

Quarterly Report 09-01  

NLE Websites -- All DOE Office Websites (Extended Search)

Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Phone: 909-469-0315 Ÿ FAX: 909-469-0319 Ÿ Juan.Argueta@sce.com Demonstration and Evaluation of U.S. Postal Service Electric Carrier Route Vehicles Quarterly Report, September 2001 AQMD CONTRACT #00192 Project Number: TC-00-0101 Report Number: TC-00-0101-TR05 Electric Vehicle Technical Center An ISO 9001 Certified Facility Prepared by: Michel Wehrey Juan C. Argueta Fabian Sanchez Julie M. Phung Southern California Edison September 26, 2001 Page i DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES This report was prepared by the Electric Transportation Division of Southern California Edison, a subsidiary of Edison International. Neither the Electric Transportation Division of Southern California Edison, Southern

157

MARKETING DEPARTMENT Office Hours Fall 2014  

E-Print Network (OSTI)

MARKETING DEPARTMENT Office Hours Fall 2014 NAME OFFICE HOURS COURSE # COURSE TITLE DAY TIME ROOM MKTG 470.2 MKTG 496.1 Marketing Research Marketing & Sales Analytics MW MW 1000-1150 1400-1550 SSW 3620-1400 and by appointment MKTG 498.1-3 MKTG 779.1 MKTG 790.1 MKTG 797.1 MKTG 798.1-3 Investigation & Report Ad. Marketing

Gallo, Linda C.

158

Strategic petroleum reserve, quarterly report  

SciTech Connect

As of December 31, 1981, the cumulative fill capability for the storage of crude oil for the SPR was 257 million barrels. Development of Phase I of the program consisting of 250 million barrels of capacity is complete and development of Phase II, consisting of 290 million barrels of capacity, is continuing. During 1981, the design of Phase III commenced. Phase III will increase the SPR capacity by 210 million barrels. The cumulative fill capability is expected to be 750 million barrels by 1990. The SPR was filled at a rate of 338,391 barrels per day during the last quarter of 1981, and had a total of 230.3 million barrels of oil in storage at the end of 1981. The Department of Energy has aggressively pursued oil purchases during 1981 in order to take advantage of the favorable international oil market. A long-term commercial contract was signed on August 20, 1981, with Petroleos Mexicanos (PEMEX), Mexico's state-owned oil company, for purchase of 110 million barrels of crude oil through 1986. The contract provided for the SPR to purchase 24 million barrels between September 1, 1981, and December 31, 1981. Thereafter PEMEX will supply crude oil to the SPR at the rate of 50,000 barrels a day through August 31, 1986. In addition, under the terms of a settlement of an overcharge allegation, Chevron USA agreed to supply 1,029,000 barrels of oil to the Reserve without cost. Deliveries under this settlement were completed in January 1982. The Omnibus Budget Reconciliation Act also requires the Secretary of the Treasury to establish an account to be known as the SPR Petroleum Account which may be obligated for the acquisition, transportation, and injection of petroleum products into the SPR. For FY 1982, Congress appropriated $3.7 billion to this account. The amount of funds obligated from the SPR Petroleum Account during the first quarter FY 1982 ending December 31, 1981, was $2056 million.

Not Available

1982-02-16T23:59:59.000Z

159

quarterly meeting | OpenEI Community  

Open Energy Info (EERE)

24 24 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234924 Varnish cache server quarterly meeting Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand

160

Lessons Learned Quarterly Report, March 1995  

Energy.gov (U.S. Department of Energy (DOE))

This second quarterly report summarizes the lessons learned for documents completedbetween October 1 and December 31, 1994. It is based on responses to the revisedquestionnaire that was provided...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Electric Power Quarterly, January-March 1983  

SciTech Connect

The Electric Power Quarterly (EPQ), a new series in the EIA statistical publications, provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the EIA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275). This edition of the EPQ contains monthly data for the first quarter of 1983. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented for the first time on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1983-07-01T23:59:59.000Z

162

Electric power quarterly, July-September 1986  

SciTech Connect

The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Form 423 are presented on a plant-by-plant basis. The EPQ presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on Form IE-417.

Not Available

1987-02-04T23:59:59.000Z

163

FOIA Quarterly Reports (Q3 2014)  

Energy.gov (U.S. Department of Energy (DOE))

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

164

FOIA Quarterly Reports (Q1-2014)  

Energy.gov (U.S. Department of Energy (DOE))

Report that captures quarterly FOIA data at the DOE level. Through the use of an Applied Programming Interface (or API), the information will display on www.FOIA.gov.

165

Lessons Learned Quarterly Report, March 2014  

Energy.gov (U.S. Department of Energy (DOE))

Welcome to the 78th quarterly report on lessons learned in the NEPA process. This issue examines some recent developments and practices in the use of GIS for NEPA and related environmental reviews.

166

NEPA Lessons Learned Second Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 (continued on page 4) Second Quarter FY 2006 June 1, 2006; Issue No. 47 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A Quality + Leadership = NEPA Success NEPA 35 Earns Special Award from NAEP; see page 3 DOE's NEPA Compliance Offi cers discussed quality assurance during the interactive meeting of more than

167

NEPA Lessons Learned Third Quarter 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2007 1 Third Quarter FY 2007 September 4, 2007; Issue No. 52 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 4) The U.S. Department of Energy (DOE) has announced its plan to evaluate eight DOE sites and two generic locations for the proposed disposal of about 5,600 cubic meters

168

E-Print Network 3.0 - acquisition review quarterly Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

: 1. A quarter-by-quarter graduation plan You must meet with a major departmental advisor (either your... declared or proposed major) to develop a realistic quarter-by-quarter...

169

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2009 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

170

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012

171

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

172

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2011 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010

173

Environmental Compliance Performance Scorecard - Second Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

174

2008/2009 NERSC User Survey Results  

NLE Websites -- All DOE Office Websites (Extended Search)

8/2009 User Survey Results 8/2009 User Survey Results Show All | 1 2 3 4 5 ... 9 | Next » 2008/2009 User Survey Results Table of Contents Response Survey Respondent Demographics Overall Satisfaction and Importance All Satisfaction and Importance Ratings Hardware Resources Software HPC Consulting Services and Communications Comments Response Survey Many thanks to the 421 users who responded to this year's User Survey. The response rate is comparable to last year's and both are significantly increased from previous years: 77.4 percent of users who had used more than 250,000 XT4-based hours when the survey opened responded 36.6 percent of users who had used between 10,000 and 250,000 XT4-based hours responded The overall response rate for the 3,134 authorized users during the survey period was 13.4%.

175

Heat transfer studies. Quarterly report  

SciTech Connect

Nitrogen gas has been used in experimental studies related to understanding issues in the extension of multi-phase models to sub-residual saturation conditions during drying. Two different flow rates of 1 SLPM and 0.5 SLPM with a room temperature boundary condition on the aluminum column have been examined. Information about variations of humidity and temperatures is given. It is shown that the situation that exists in the experiments is somewhat different than that found in typical assumptions made by numerical modelers. Work planned for the next quarter is outlined. The apparatus used for the work noted above will be supplemented to allow other temperature conditions than ambient to be evaluated. Temperatures up to 90{degree}C will be used. Other work planned for the next period will involve the use of small-scale simulated repository experiment to determine temperatures and humidities around a horizontal heater within an annulus in a rigid porous medium. The effect of backfill on performance when episodic flows are encountered will be compared to results when backfill is not present (the latter results have been determined earlier).

Boehm, R.; Chen, Y.T.; Vallebuona, J.

1995-07-20T23:59:59.000Z

176

Calorimetry exchange program quarterly data report, fourth quarter CY92  

SciTech Connect

The goals of the Calorimetry Sample Exchange Program are: (1) discuss measurement differences (2) review and improve analytical measurements and methods (3) discuss new measurement capabilities (4) provide data to DOE on measurement capabilities to evaluate shipper- receiver differences (5) provide characterized or standard materials as necessary for exchange participants (6) provide a measurement control program for plutonium analysis A sample Of PUO2 powder is available at each participating site for NDA measurement, including either or both calorimetry and high-resolution gamma-ray spectroscopy, the elements which are typically combined to provide a calorimetric assay of plutonium. The facilities measure the sample as frequently and to the level of precision which they desire, and then submit the data to the Exchange for analysis. The data report includes summary tables for each measurement and charts showing the performance of each laboratory. Comparisons are made to the accepted values for the exchange sample and to data previously reported by that laboratory. This information is presented, in the form of quarterly reports as this document provides and as annual reports, intended for use by Exchange participants in measurement control programs, or to indicate when bias corrections may be appropriate. No attempt, however, has been made to standardize methods or frequency of data collection, calibration, or operating procedures. Direct comparisons between laboratories may, therefore, be misleading since data have not been collected to the same precision or for the same time periods. A meeting of the participants of the Calorimetry Exchange is held annually at EG&G Mound Applied Technologies. The purposes of this meeting are to discuss measurement differences, problems, and new measurement capabilities, and to determine the additional activities needed to fulfill the goals of the Exchange.

Barnett, T.M.

1992-12-31T23:59:59.000Z

177

hourly solar radiation | OpenEI  

Open Energy Info (EERE)

solar radiation solar radiation Dataset Summary Description (Abstract): A need for predicting hourly global radiation exists for many locations particularly in Bangladesh for which measured values are not available and daily values have to be estimated from sunshine data. The CPRG model has been used to predict values of hourly Gh for Dhaka (23.770N, 90.380E), Chittagong (22.270N, 91.820E) and Bogra (24.850N, 89.370E) for = ±7.50, ±22.50, ±37.50, ±52.50, ±67.50, ±82.50 and ±97.50 i.e., for ±1/2, ±3/2, ±5/2, ±7/2, ±9/2, ±11/2, ±13/2 hours before and after solar noon and the computed values for Source Renewable Energy Research Centre Date Released October 22nd, 2003 (11 years ago) Date Updated Unknown Keywords Bangladesh documentation hourly solar radiation SWERA

178

Ethics and Public Health 3 credit hours  

E-Print Network (OSTI)

PUB H Ethics and Public Health 3 credit hours Summer, 2009 Instructor: Ann Cook, PhD, MPA, Research U.S. public health policies. The course begins with a rationale for studying the ethical dimensions of public health and then examines ethical decisonmaking in arenas such as policy development, research

Vonessen, Nikolaus

179

Credit Based; Beginning Swimming Credit/Hour  

E-Print Network (OSTI)

the pool. To be able to swim at least 50 yards with one of the learned strokes. Required Materials: Swim. Make-Ups: Only two make-ups allowed by swimming laps during open swim/lap swim at MSU pool. Lap swimCredit Based; Beginning Swimming Credit/Hour s Class Title Lead Instructo r Phone Email Office

Maxwell, Bruce D.

180

Project Management Foundation 21 hours, $895  

E-Print Network (OSTI)

Project Management Foundation 21 hours, $895 The fundamental project management processes. In group exercises, participants gain an understanding of how the project management processes are used during each phase of a project to build a better, more effective project plan. Topics Include

Alabama in Huntsville, University of

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

2009-2010 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2009-2010 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6 or satisfactory placement test score Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31

Grissino-Mayer, Henri D.

182

2007-2008 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2007-2008 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-4 ___ Math 119 or 123 or satisfactory placement test score TOTAL 32-33 Second Year Advertising 250 3 ___ Advertising 310 3 ___ Adv 250 and admission to the major TOTAL 31 Third Year Psychology 110 3 ___ Business

Grissino-Mayer, Henri D.

183

2011-12 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2011-12 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

184

2010-11 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2010-11 Advertising Curriculum Hours PREREQUISITES First Year English 101, 102 6-33 Math 141: Math 130 or placement level Second Year Advertising 250 3 ___ Public Relations 270 3 ___ 3 Economics 201 4 ___ Statistics 201 3 ___ Math 125 or Math 141 Accounting 200 3 ___ Advertising 310 3

Grissino-Mayer, Henri D.

185

2012-13 Advertising Curriculum Hours PREREQUISITES  

E-Print Network (OSTI)

2012-13 Advertising Curriculum Hours PREREQUISITES First Year English 101*, 102* 6 Advertising 250 3 ___ Public Relations 270 3 ___ 3 History 241*, 242* or 261*, 262* 6 ___ ___ 4 English or Math 141 Accounting 200 3 ___ Advertising 310 3 ___ Advertising 250 TOTAL 31 Third Year Psychology 110

Grissino-Mayer, Henri D.

186

OE Releases 2014 Issue 2 of Energy Emergency Preparedness Quarterly...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Issue 2 of Energy Emergency Preparedness Quarterly (August 2014) OE Releases 2014 Issue 2 of Energy Emergency Preparedness Quarterly (August 2014) August 7, 2014 - 3:16pm Addthis...

187

Quarterly Biomass Program/Clean Cities State Web Conference:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Quarterly Biomass ProgramClean Cities State Web Conference: May 6, 2010 Presentation from May 6, 2010...

188

NERSC Edison Phase I Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Edison Phase I Hours Used Edison Phase I Hours Used Edison Phase I Hours Used Edison Usage Chart Edison Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 06/23/2013 0.226 88.6 06/22/2013 0.239 93.9 06/21/2013 0.248 97.1 06/20/2013 0.240 94.0 06/19/2013 0.233 91.3 06/18/2013 0.245 96.0 06/17/2013 0.251 98.4 06/16/2013 0.243 95.3 06/15/2013 0.245 95.9 06/14/2013 0.246 96.5 06/13/2013 0.240 94.1 06/12/2013 0.128 50.4 06/11/2013 0.215 84.5 06/10/2013 0.225 88.4 06/09/2013 0.228 89.6 06/08/2013 0.225 88.3 06/07/2013 0.121 47.5 06/06/2013 0.223 87.4 06/05/2013 0.250 98.0 06/04/2013 0.234 91.6 06/03/2013 0.218 85.5 06/02/2013 0.246 96.4 06/01/2013 0.230 90.0 05/31/2013 0.215 84.5 05/30/2013 0.212 83.1 05/29/2013 0.223 87.3 05/28/2013 0.237 93.0 05/27/2013 0.226 88.5 05/26/2013 0.229 89.9

189

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval)  

E-Print Network (OSTI)

Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval year. The Graduate Student Coordinator for Health Promotion is responsible for assisting the Fitness & Health Promotion Coordinator in the development, promotion, management and implementation of Campus Rec

Lafferriere, Gerardo

190

Society, Technology and the Environment-3credit hours Spanish for Engineering-6 credit hours  

E-Print Network (OSTI)

Society, Technology and the Environment- 3credit hours Spanish for Engineering- 6 credit hours 21st May to 22nd June 2012 The University of Alabama College of Engineering in collaboration with Pamplona for any student interested in technology and the environment; students will have the opportunity to study

Simaan, Nabil

191

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

192

Natural gas imports and exports. Second quarter report  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

NONE

1997-12-31T23:59:59.000Z

193

Quarterly Coal Report: January-March 2002  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January - March 2002 August 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr_sum.html _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report January - March 2002 ii Contacts

194

Quarterly Coal Report: October-December 2001  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October - December 2001 May 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report October - December 2001 iii Contacts

195

Quarterly Coal Report April-June 2002  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2002 September 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report April - June 2002 ii Contacts This publication was prepared by

196

Idaho National Laboratory Quarterly Performance Analysis  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

Lisbeth Mitchell

2014-11-01T23:59:59.000Z

197

U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 4th Quarter 2012 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,226 162 274 - 1,662 Alabama Railroad 803 17 22 - 842 Alabama River 384 - - - 384 Alabama Truck 39 144 252 - 436 Georgia Total s - - - s Georgia Truck s - - - s Indiana Total

198

U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013  

Gasoline and Diesel Fuel Update (EIA)

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 3rd Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,198 151 353 - 1,702 Alabama Railroad 796 26 20 - 842 Alabama River 307 - 3 - 310 Alabama Truck 96 125 330 - 551 Georgia Total - - 3 - 3 Georgia Truck - - 3 - 3 Indiana Total

199

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic coal distribution, by destination State, 2nd Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,714 158 238 - 2,110 Alabama Railroad 1,056 12 45 - 1,113 Alabama River 464 - - - 464 Alabama Truck 194 146 193 - 532 Colorado Total 275 - - - 275

200

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 2nd Quarter 2013 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,066 210 301 - 1,577 Alabama Railroad 495 116 26 - 638 Alabama River 512 - 2 - 513 Alabama Truck 59 94 273 - 426 Colorado Total 97 - - - 97 Colorado

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2012 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic coal distribution, by origin State, 2nd Quarter 2012 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,714 158 238 - 2,110 Alabama Railroad 1,056 12 45 - 1,113 Alabama River 464 - - - 464 Alabama Truck 194 146 193 - 532 Georgia Total s - - - s Georgia Truck s - - - s

202

U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic coal distribution, by destination State, 3rd Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,837 167 196 - 2,200 Alabama Railroad 1,051 25 10 - 1,087 Alabama River 730 - - - 730 Alabama Truck 56 141 186 - 384 Colorado Total 456 - 16 - 472

203

U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Destination Destination State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2012 Alabama _____________________________________________________________________________________________________________________________________ Table DS-1. Domestic Coal Distribution, by Destination State, 4th Quarter 2012 Destination: Alabama (thousand short tons) Coal Origin State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,226 162 274 - 1,662 Alabama Railroad 803 17 22 - 842 Alabama River 384 - - - 384 Alabama Truck 39 144 252 - 436 Colorado Total 301 - 25 - 326 Colorado

204

U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 2nd Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 2nd Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 1,066 210 301 - 1,577 Alabama Railroad 495 116 26 - 638 Alabama River 512 - 2 - 513 Alabama Truck 59 94 273 - 426 Georgia Total - - 2 - 2 Georgia Truck - - 2 - 2 Indiana Total

205

U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Origin Origin State ____________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 1st Quarter 2013 Alabama ___________________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal Distribution, by Origin State, 1st Quarter 2013 Origin: Alabama (thousand short tons) Coal Destination State Transportation Mode Electric Power Sector Coke Plants Industrial Plants (excluding Coke) Commercial & Institutional Total Alabama Total 807 158 282 - 1,247 Alabama Railroad 449 71 14 - 534 Alabama River 358 - - - 358 Alabama Truck - 87 267 - 354 Indiana Total - 164 - - 164 Indiana Railroad - 164 - - 164

206

Quarterly Coal Report October - December 2003  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Quarterly Coal Report October - December 2003 March 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

207

Quarterly Coal Report - July - September 2004  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2004 December 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

208

Quarterly Coal Report April … June 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Independent Statistics & Analysis Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Report April - June 2013 October 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Report April - June 2013

209

Quarterly Coal Report April - June 2003  

Gasoline and Diesel Fuel Update (EIA)

3/02Q) 3/02Q) Quarterly Coal Report April - June 2003 October 2003 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

210

Quarterly Coal Report April - September 2003  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2003 December 2003 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

211

Quarterly Coal Report January - March 2004  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2004 September 2004 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

212

Quarterly Coal Report Julyl-September 2002  

Gasoline and Diesel Fuel Update (EIA)

2/03Q) 2/03Q) Quarterly Coal Report July - September 2002 September 2002 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr_sum.html _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

213

2000 NERSC User Survey Results  

NLE Websites -- All DOE Office Websites (Extended Search)

0 User Survey Results 0 User Survey Results Show All | 1 2 3 4 5 ... 10 | Next » 2000 User Survey Results Table of Contents Response Summary User Information Overall Satisfaction and Importance All Satisfaction Questions and FY 1999 to FY 2000 Changes Consulting and Account Support Web and Communications Hardware Resources Software Resources Training User Comments Response Summary NERSC extends its thanks to all the users who participated in this year's survey. Your responses provide feedback about every aspect of NERSC's operation, help us judge the quality of our services, give DOE information on how well NERSC is doing, and point us to areas we can improve. Every year we institute changes based on the survey; the FY 1999 survey resulted in the following changes: We created a long-running queue (12 hours maximum) for jobs using up

214

Faculty Office Hours Fall 2014 Aberle, James  

E-Print Network (OSTI)

Faculty Office Hours Fall 2014 Aberle, James GWC 326 01:30 PM 02:45 PMM T W F to Tuesday is through:30 AMR to Coleman, James BYENG 450 08:45 AM 09:45 AMT R to By Appointment Cotter, Jeff GWC 424 03:15 PM:00 AM 09:30 AMF to Or at a time arranged via e-mail to reisslein@asu.edu Rodriguez, Armando GWC 352 10

Zhang, Yanchao

215

Environmental Compliance Performance Scorecard - Third Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Third Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011

216

Environmental Compliance Performance Scorecard - First Quarter FY2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Environmental Compliance Performance Scorecard - First Quarter FY2013 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2013 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2010

217

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2012

218

Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

219

Environmental Compliance Performance Scorecard - Third Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Third Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

220

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2010

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Environmental Compliance Performance Scorecard - Second Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Second Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009

222

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010 Environmental Compliance Performance Scorecard - First Quarter FY2011

223

Environmental Compliance Performance Scorecard - Third Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

224

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production  

NLE Websites -- All DOE Office Websites (Extended Search)

Hour-by-Hour Cost Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Genevieve Saur (PI), Chris Ainscough (Presenter), Kevin Harrison, Todd Ramsden National Renewable Energy Laboratory January 17 th , 2013 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Acknowledgements * This work was made possible by support from the U.S. Department of Energy's Fuel Cell Technologies Office within the Office of Energy Efficiency and Renewable Energy (EERE). http://www.eere.energy.gov/topics/hydrogen_fuel_cells.html * NREL would like to thank our DOE Technology Development Managers for this project, Sara Dillich, Eric Miller, Erika Sutherland, and David Peterson. * NREL would also like to acknowledge the indirect

225

NEPA Lessons Learned Quarterly Report, March 3, 2008; Issue No. 54; First Quarter FY 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 1 08 1 First Quarter FY 2008 March 3, 2008; Issue No. 54 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 3) Programmatic EIS on Nuclear Weapons Complex Draws National Interest, Many Comments Dinah Bear, General Counsel Council on Environmental Quality Anne Norton Miller, Director Offi ce of Federal Activities

226

NEPA Lessons Learned Quarterly Report, June 1, 2005; Issue No. 43; Second Quarter FY 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Second Quarter FY 2005 June 1, 2005; Issue No. 43 LESSONS LEARNED LEARNED LESSONS (continued on page 4) Who Has More Than 500 Years of NEPA Experience? A Closer Look at the DOE NEPA Compliance Officers Who are these 47 individuals? What inspires their commitment to the environment? How do they carry out

227

NEPA Lessons Learned Quarterly Report, Issue No. 41; Fourth Quarter FY 2004; December 1, 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 The EIS Comment-Response Process Guidance Issued; see page 9 Putting the Web to Work for NEPA National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2004 December 1, 2004; Issue No. 41 LESSONS LEARNED LEARNED LESSONS (continued on page 4) "What's your e-mail address? Do you have a Web site?" These are common questions in

228

Idaho National Laboratory Quarterly Performance Analysis - 3rd Quarter FY2014  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other non-reportable issues identified at INL from July 2013 through June 2014.

Lisbeth A. Mitchell

2014-09-01T23:59:59.000Z

229

Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

Lisbeth A. Mitchell

2014-06-01T23:59:59.000Z

230

Lessons Learned Quarterly Report, December 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Lessons Learned Quarterly Report, December 1999 Welcome to the 21st Quarterly Report on lessons learned in the NEPA process. This report includes: Good Information, Good Government; CEQ 1997 Report to Congress on Environmental Quality" Managing a National Public Participation Program for the Yucca Mountain EIS New Executive Order on Trade Agreements NEPA Challenges for Western Area Power Administration Is CD-ROM a Useful Complement to Paper Documents? Pollution Prevention and NEPA Clean Air Act Conformity and NEPA National Natural Landmark Considerations Include Distribution List in EIS Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, June 2002 Lessons Learned Quarterly Report, September 2002

231

Lessons Learned Quarterly Report, March 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1999 March 1999 Lessons Learned Quarterly Report, March 1999 Welcome to the first quarter FY 1999 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Dr. David Michaels DOEs New Leader for Environment, Safety and Health Society Promotes Lessons Learned Exchange at DOE Partnering Facilitates SPR Pipeline EA Mini-guidance An EIS Needs an Index When We Dont Know, Say So Extending Public Comment Periods Advisory Council on Historic Preservation to Issue New Section 106 Regulations DOE -wide NEPA Contracts Litigation Updates Executive Order Issued on Invasive Species Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, December 1998 Lessons Learned Quarterly Report, June 1999 Lessons Learned Quarterly Report, June 2002

232

Quarter 1, 2012 Page 1 of 2  

E-Print Network (OSTI)

incompatible chemicals? 16. Are incompatible chemicals segregated according to SU storage scheme? 17. Is lab-level contact. (Return roster with completed Q1-12 Self-Inspection checklist to department) 22. Our lab has. Make sure that ALL rooms listed for your PI have been included as part of this quarter's self

Ford, James

233

Lessons Learned Quarterly Report, December 2012  

Energy.gov (U.S. Department of Energy (DOE))

Welcome to the 73rd quarterly report on lessons learned in the NEPA process. In this issue, we highlight practices of DOEs NEPA Community that help ensure the quality of our NEPA reviews. Emphasizing quality throughout the NEPA process is essential to meeting schedules and providing useful information to the public and decisionmakers.

234

Quarterly Report for July -September 1999  

E-Print Network (OSTI)

;#12;Table of Contents 1. MEASUREMENTS OF STEAM-WATER RELATIVE PERMEABILITY 1 1.1 BACKGROUND 1 1 CONDUCTIVITY OF HEAT FLUX SENSORS 8 2.4 FUTURE WORK 9 3. INFERRING ENDPOINT SATURATION FROM BOILING EXPERIMENTS of fluid saturation in the core this quarter. 1.1 BACKGROUND An X-ray CT technique has been used in recent

Stanford University

235

Oxygen Transport Ceramic Membranes Quarterly Report  

E-Print Network (OSTI)

/Reaction rates in Ion 21 Transport Membranes using Isotope Tracer and Transient Kinetic Techniques CONCLUSIONS 30Oxygen Transport Ceramic Membranes Quarterly Report January 2003 ­ March 2003 Principal Authors on the thermodynamic properties of the membrane materials are continued to develop a complete model for the membrane

Eagar, Thomas W.

236

NEAMS Quarterly Report April-June 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights, fuel and reactor product line accomplishments, recent and upcoming milestones, news on BISON fuel benchmarks, the latest MeshKit release features, and information on numerical simulations of pebble-bed reactor cores performed by the thermal hydraulics team.

237

NOAA Air Resources Laboratory Quarterly Activity Report  

E-Print Network (OSTI)

and Hawaii Meteorological Grids for NCEP Atmospheric Turbulence and Diffusion Division 18. Climate 19. Air for Europe convention on Long-Range Transport of Air Pollution. o.russell.bullock@noaa.gov 3. CarbonNOAA Air Resources Laboratory Quarterly Activity Report (January ­ March 2008) Contents Highlights

238

October 2007 CEELP Quarterly Environmental & Energy Newsletter  

E-Print Network (OSTI)

October 2007 CEELP Quarterly Environmental & Energy Newsletter Issue 2 The following items appear in this edition: (1) Responsibilities for Energy Policy: Movements in Wales and Westminster (2) Meeting the Energy Challenge - A White Paper on Energy, 2007 (3) The Energy White Paper and Devolution (4) Energy Aspects

Martin, Ralph R.

239

Lessons Learned Quarterly Report, September 1997  

Energy.gov (U.S. Department of Energy (DOE))

Welcome again to the Quarterly Report on lessons learned in the NEPA process. This issue features NEPA success stories from field organizations: how the NEPA process helped resolve cultural resource protection issues at Fernald, and how innovative approaches are aiding preparation of a Site-wide EIS for Sandia, New Mexico.

240

20140430_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

2014-05-05T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Green Machine Florida Canyon Hourly Data 20130731  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

2013-08-30T23:59:59.000Z

242

20130416_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

2013-04-24T23:59:59.000Z

243

Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

2013-07-15T23:59:59.000Z

244

Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

Vanderhoff, Alex

245

20130416_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

Vanderhoff, Alex

246

20140430_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

Thibedeau, Joe

247

Green Machine Florida Canyon Hourly Data 20130731  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

Vanderhoff, Alex

248

Cleanroom After-Hours Policy Original: 11/04  

E-Print Network (OSTI)

Cleanroom After-Hours Policy Original: 11/04 Revised: 2//05 CAMD strives to maintain and improve laboratory and User safety along with User efficiency. After- Hours work inside the cleanroom (CR + all hours of LSU Staff holidays. After-Hours Access Request · Cleanroom-trained Users can apply for CR

249

Guidelines for Use MIT Libraries' 24 Hour Study Space  

E-Print Network (OSTI)

Guidelines for Use MIT Libraries' 24 Hour Study Space Access to and use of the MIT Libraries' 24://libguides.mit.edu/hours)). The following principles guide access to 24-hour spaces for all users of the MIT Libraries: Expectations Library policies Behavior Library users in the 24-hour study spaces are expected to refrain from: � Behaviors

250

2007/2008 NERSC User Survey Results  

NLE Websites -- All DOE Office Websites (Extended Search)

7/2008 User Survey Results 7/2008 User Survey Results Show All | 1 2 3 4 5 ... 10 | Next » 2007/2008 User Survey Results Table of Contents Response Summary Overall Satisfaction and Importance All Satisfaction, Importance and Usefulness Ratings Hardware Resources Software Visualization and Data Analysis HPC Consulting Services and Communications Web Interfaces Comments about NERSC Response Summary Many thanks to the 467 users who responded to this year's User Survey. The response rate has significantly increased from previous years: 70 percent of users who had used more than 1 million MPP hours when the survey opened responded 43 percent of users who had used between 10,000 and 1 million MPP hours responded The overall response rate for the 2,804 authorized users during the survey period was 16.3%.

251

Mixed Waste Management Facility groundwater monitoring report. Second quarter 1994  

SciTech Connect

Currently, 125 wells monitor groundwater quality in the uppermost aquifer beneath the Mixed Waste Management Facility (MWMF) at the Savannah River Site. Samples from the wells are analyzed for selected heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. During second quarter 1994, chloroethene (vinyl chloride), 1,1-dichloroethylene, gross alpha, lead, tetrachloroethylene, trichloroethylene, or tritium exceeded final Primary Drinking Water Standards (PDWS) in approximately half of the downgradient wells at the MWMF. Consistent with historical trends, elevated constituent levels were found primarily in Aquifer Zone. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents during second quarter 1994. Sixty-two of the 125 monitoring wells contained elevated tritium activities. Trichloroethylene concentrations exceeded the final PDWS in 23 wells. Chloroethene, 1,1-dichloroethylene, lead, and tetrachloroethylene, elevated in one or more wells during second quarter 1994, also occurred in elevated levels during first quarter 1994. These constituents generally were elevated in the same wells during both quarters. Gross alpha, which was not elevated in any well during first quarter 1994, was elevated in one well during second quarter. Copper, mercury, and nonvolatile beta were elevated during first quarter 1994 but not during second quarter.

Chase, J.A.

1994-09-01T23:59:59.000Z

252

hourly emission factors | OpenEI  

Open Energy Info (EERE)

60 60 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278660 Varnish cache server hourly emission factors Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago)

253

Liquid fossil fuel technology. Quarterly technical progress report, July-September 1981  

SciTech Connect

Progress accomplished during the quarter ending September 1981 is reported under the following headings: liquid fossil fuel cycle; extraction (reservoir characterization and evaluation, recovery projects, reservoir access, extraction technology, recovery processes and process implementation); liquid processing (characterization, thermodynamics, and process technology); utilization (energy conversion - adaptive engineering, combustion systems assessment, and heat engines/heat recovery); and project integration and technology transfer. Special reports include: air drilling research; fluid injection in reservoirs; target reservoirs in Permian Basin suitable for CO/sub 2/ flooding; heavy oil technology; and the fate of used motor oil/results of a survey.

Linville, B. (ed.)

1982-01-01T23:59:59.000Z

254

Estimation of hourly global and diffuse solar radiation from hourly sunshine duration  

SciTech Connect

A statistical procedure has been employed to develop correlations of monthly-mean-hourly global and diffuse solar radiation on a horizontal surface to hourly sunshine duration. Several years of measured data on solar radiation and sunshine duration, reported in the literature for two stations in the southern African region, is employed for this purpose. The applicability of the developed correlations is tested by estimating solar radiation for a new location. The excellent agreement between the measured and estimated data for that station the wide applicability of the method.

Gopinathan, K.K (National Univ. of Lesotho, Roma (South Africa))

1992-01-01T23:59:59.000Z

255

First Quarter Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect

The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite interferometry that detected approximately 1 inch uplift in surface deformation along an east-west transect within the swarm area. The uplift is thought to be caused by the release of pressure that has built up in sedimentary layers, cracking the brittle basalt layers with the Columbia River Basalt Formation (CRBG) and causing the earthquakes. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, sixteen earthquakes were recorded, all minor events. Seven earthquakes were located at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments and nine earthquakes at depths greater than 9 km, within the basement. Geographically, seven earthquakes were located in known swarm areas and nine earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2010-03-29T23:59:59.000Z

256

Lessons Learned Quarterly Report, December 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Lessons Learned Quarterly Report, December 2001 Welcome to the 29th quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Included in this issue: CEQ Chair Describes Goals, Supports NEPA Principles DOE NEPA Post-9/11: Reconciling the Need to Protect and the Need to Inform the Public Agencies Responses to Terrorist Attacks Forest Service Succeeds with NEPA Training Oak Ridge Holds NEPA Community Meeting DOE-wide NEPA Contracts Update Training Opportunities New on the NEPA Bookshelf Litigation Update EAs and EISs Completed This Quarter Recent EIS-Related Milestones Fourth Quarter FY 2001 Questionnaire Results NEPA Document Cost and Time Facts

257

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2007 September 4, 2007 Lessons Learned Quarterly Report, September 2007 Welcome to the 52nd quarterly report on lessons learned in the NEPA process. This issue highlights the start of two major DOE EISs and features several guest-written articles. June 1, 2007 Lessons Learned Quarterly Report, June 2007 Welcome to the 51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches to and benefits of collaboration and illustrate various applications. March 1, 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the

258

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Capacity (short tons of ore per day) 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 EFR White Mesa LLC White Mesa Mill San Juan, Utah 2,000 Operating Operating Operating Operating-Processing Alternate Feed Energy Fuels Resources Corporation Piñon Ridge Mill Montrose, Colorado 500 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Permitted And Licensed Energy Fuels Wyoming Inc Sheep Mountain Fremont, Wyoming 725 - Undeveloped Undeveloped Undeveloped Kennecott Uranium Company/Wyoming Coal Resource Company Sweetwater Uranium Project Sweetwater, Wyoming 3,000

259

Financial News for Major Energy Companies, Fourth Quarter 2005  

Gasoline and Diesel Fuel Update (EIA)

Fourth Quarter 2005 Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $28.7 billion on revenues of $298.4 billion (i.e., 9.6 cents of net income per dollar of revenue) during the fourth quarter of 2005 (Q405). The level of net income for Q405 was 43 percent higher than in the fourth quarter of 2004 (Q404) (Table 1). Net income for Q405

260

Lessons Learned Quarterly Report, September 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1998 September 1998 Lessons Learned Quarterly Report, September 1998 Welcome to the third quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: DOE NEPA Community to Meet in October Guidance Underway to Assist NEPA Process National Academy of Public Administration Examines the DOE NEPA Process NEPA Practitioners Bookshelf Publishing a Draft EIS on the Web DOE-Wide NEPA Contracts Showing Benefits NAEP Conference in San Diego Litigation Updates Presidential Memorandum on Plain Language Third Quarter FY 1998 Questionnaire Results NEPA Document Cost and Time Facts NEPA Documents Completed EIS-related Documents Recent Milestones Cumulative Index Lessons Learned Quarterly Report (LLQR) More Documents & Publications Lessons Learned Quarterly Report, September 2002

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Lessons Learned Quarterly Report, December 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, December 2012 This issue highlights practices of DOE's NEPA Community that help ensure the quality of our NEPA reviews. Emphasizing quality throughout the NEPA process is essential to meeting schedules and providing useful information to the public and decisionmakers. Articles in this issue include: Quality Assurance Integral to NEPA Implementation DOE NEPA Guidance Plans OMB-CEQ Affirm Commitment to ECR Canada's New NEPA-Like Law Transitions John Jediny Joins DOE NEPA Office EAs and EISs Completed This Quarter Questionnaire Results Cost and Time Facts LLQR-2012-Q4-r1.pdf More Documents & Publications Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, March 2013

262

Lessons Learned Quarterly Report, September 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Lessons Learned Quarterly Report, September 1999 Welcome to the 20th Quarterly Report on lessons learned in the NEPA process. This issue includes a cumulative index for the past five years. Articles in this issue include: Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis CEQ Memo on Non-Federal Cooperating Agencies EPA Guidance on Cumulative Impacts DOE NEPA Web Demonstration Publishing a Draft EIS on NEPA Web NAEP Conference Forest Services Decision Protocol DOE-wide NEPA Contracts Update DOE Litigation Update Other Agency NEPA Cases EAs and EISs Completed this Quarter Other EIS-related Documents Third Quarter FY 1999 Questionnaire Results Cost and Time Facts Training Opportunities

263

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and  

Open Energy Info (EERE)

Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Authors Ormat Technologies and Inc. Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results Citation Ormat Technologies, Inc.. Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth Quarter and Year End Results [Internet]. [updated 2013;cited 2013]. Available from: http://www.ormat.com/news/latest-items/ormat-technologies-reports-2012-fourth-quarter-and-year-end-results

264

Lessons Learned Quarterly Report, March 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 1997 Lessons Learned Quarterly Report, March 1997 Lessons Learned Quarterly Report, March 1997 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: CEQ Effectiveness Study CEQ Handbook on Cumulative Effects DOE Sites Enhancing Public Participation in EAs Stockpile Stewardship and Management ROD Issued EIS Distribution: Coordination with Congressional, Public and Intergovernmental Affairs EPA EIS Rating System Results of EA Quality Review DOE NEPA Web as Research Tool Litigation Updates DOE NEPA Process Data Misused GC to Provide Administrative Record Guidance Questions and Answers on Supplement Analyses First Quarter FY 1997 Lessons Learned Questionnaire Results, including EIS and EA Cost and Time reports Lessons Learned Quarterly Report

265

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements » Lessons Learned » Lessons Learned Guidance & Requirements » Lessons Learned » Lessons Learned Quarterly Report Archive Lessons Learned Quarterly Report Archive December 2, 2013 Lessons Learned Quarterly Report, December 2013 Welcome to the 77th quarterly report on lessons learned in the NEPA process. This issue reminds us that, through teamwork and dedication by DOE's NEPA community, we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment. September 6, 2013 Lessons Learned Quarterly Report, September 2013 Welcome to the 76th quarterly report on lessons learned in the NEPA process. This issue features a look at DOE's NEPA performance metrics, including a historical perspective. As DOE NEPA practitioners strive to control time and cost while maintaining quality, this most recent NEPA

266

Lessons Learned Quarterly Report, March 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2013 March 2013 Lessons Learned Quarterly Report, March 2013 In this issue, we highlight the many benefits of NEPA to DOE, including improved planning, and better public involvement and environmental protection. Articles in this issue include: Sharing DOE's NEPA Success Stories Integrating NEPA and Project Planning Works Minimize EIS Printing Costs DOE Cooperating Agency Report Electronic Guidance Compendium Tribal Energy Resource CEQ IT Working Group Conferences DOE-wide NEPA Contracts Update Transitions EAs and EISs Completed This Quarter Questionnaire Results Cost and Time Facts LLQR-2013-Q1.pdf More Documents & Publications Lessons Learned Quarterly Report, December 2012 Lessons Learned Quarterly Report, March 2013 Lessons Learned Quarterly Report, June 2013 Lessons Learned Quarterly Report, September

267

Lessons Learned Quarterly Report, December 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Lessons Learned Quarterly Report, December 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: "NEPA Compliance Officers Meeting: Continuous Improvement" DOE Comments on CEQ Cumulative Impacts Handbook DOE-wide NEPA Procurement Environmental Justice Guidance Update Senate Subcommittee Focuses on NEPA DOE NEPA Rule Amendments for Power Marketing Activities Litigation Updates: Rulings on Alternatives Environmental Assessment Quality Study Fourth quarter FY1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports Analysis of EA and EIS cost and time outliers EA and EIS cost and time trend analysis Lessons Learned Quarterly Report

268

NEPA Lessons Learned Quarterly Report June 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 2001 June 1, 2001; Issue No. 27 continued on page 3 The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, on the theme of “NEPA: What’s New, What’s Next.” Horst Greczmiel, CEQ’s Associate Director for NEPA Oversight, and Anne Miller, Acting Director of the EPA’s Office of Federal

269

NEPA Lessons Learned Quarterly Report December 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 2000 December 1, 2000; Issue No. 25 DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined On October 26, 2000, the Deputy Secretary of Energy issued DOE O 451.1B, National Environmental Policy Act Compliance Program, to accommodate National Nuclear Security Administration (NNSA) NEPA responsibilities. The revised Order has an expanded section on applicability and a new section on NNSA procedures. With respect to an EIS for an NNSA activity, the NNSA Administrator will fulfill the responsibilities of a Secretarial Officer (including consulting with the NNSA General Counsel), and the Secretary or Deputy

270

Microsoft PowerPoint - quarterly_1040311.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Review March 11, 2004 C Mod Alcator - C Mod Alcator - Agenda * Status of JOULE milestones and quarterly sub- milestones (due March 31, 2004) - Comparison of single-null, double-null, inner-wall- limited ... (Marmar) - Design of ICRF antenna (Marmar) - Research operation weeks (Irby) * Lower hybrid status (Irby) * Operations plans (Irby) * Recent 2-frequency ITB results (Marmar) C Mod Alcator - JOULE Milestone SC6-1b * Compare energy confinement, H-Mode thresholds, and diverter particle dynamics in single-null, double-null and inner-wall-limited discharges ... - Quarterly sub-milestone: assess energy confinement in double-null discharges (March 31, 2004) * Status - Runs taken to compare single-null and double-null confinement - First limiter H-modes achieved (both lower nose and inner-wall limited), thresholds measured

271

EMSL 3rd Quarter Research Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

rd Quarter, Fiscal Year 2008 rd Quarter, Fiscal Year 2008 (April 1, 2008, through June 30, 2008) DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by

272

Quarterly Coal Report: July-September 2001  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Distribution Category UC-950 Quarterly Coal Report July - September 2001 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Energy Information Administration/Quarterly Coal Report July - September 2001 ii Contacts This publication was prepared by Paulette Young under the direction of Betsy O'Brien, Director, Coal, Nuclear, and Renewables Fuels Division, Office of Coal, Nuclear, Electric and Alternate Fuels within the Energy Information Administration, U.S.

273

Robotic Surveying  

SciTech Connect

ZAPATA ENGINEERING challenged our engineers and scientists, which included robotics expertise from Carnegie Mellon University, to design a solution to meet our client's requirements for rapid digital geophysical and radiological data collection of a munitions test range with no down-range personnel. A prime concern of the project was to minimize exposure of personnel to unexploded ordnance and radiation. The field season was limited by extreme heat, cold and snow. Geographical Information System (GIS) tools were used throughout this project to accurately define the limits of mapped areas, build a common mapping platform from various client products, track production progress, allocate resources and relate subsurface geophysical information to geographical features for use in rapidly reacquiring targets for investigation. We were hopeful that our platform could meet the proposed 35 acres per day, towing both a geophysical package and a radiological monitoring trailer. We held our breath and crossed our fingers as the autonomous Speedrower began to crawl across the playa lakebed. We met our proposed production rate, and we averaged just less than 50 acres per 12-hour day using the autonomous platform with a path tracking error of less than +/- 4 inches. Our project team mapped over 1,800 acres in an 8-week (4 days per week) timeframe. The expertise of our partner, Carnegie Mellon University, was recently demonstrated when their two autonomous vehicle entries finished second and third at the 2005 Defense Advanced Research Projects Agency (DARPA) Grand Challenge. 'The Grand Challenge program was established to help foster the development of autonomous vehicle technology that will some day help save the lives of Americans who are protecting our country on the battlefield', said DARPA Grand Challenge Program Manager, Ron Kurjanowicz. Our autonomous remote-controlled vehicle (ARCV) was a modified New Holland 2550 Speedrower retrofitted to allow the machine-actuated functions to be controlled by an onboard computer. The computer-controlled Speedrower was developed at Carnegie Mellon University to automate agricultural harvesting. Harvesting tasks require the vehicle to cover a field using minimally overlapping rows at slow speeds in a similar manner to geophysical data acquisition. The Speedrower had demonstrated its ability to perform as it had already logged hundreds of acres of autonomous harvesting. This project is the first use of autonomous robotic technology on a large-scale for geophysical surveying.

Suzy Cantor-McKinney; Michael Kruzic

2007-03-01T23:59:59.000Z

274

Survey Statisticians  

U.S. Energy Information Administration (EIA) Indexed Site

Survey Statisticians Survey Statisticians The U.S.Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Survey Statistician, who measures the amounts of energy produced and consumed in the United States. Responsibilities: Survey Statisticians perform or participate in one or more of the following important functions: * Design energy surveys by writing questions, creating layouts and testing questions for clarity and accuracy. * Conduct energy surveys to include sending out and tracking survey responses, editing and analyzing data submis- sions and communicating with respondents to verify data.

275

Lessons Learned Quarterly Report, Fourth Quarter FY 2001 (12/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2001 December 5, 2001; Issue No. 29 CEQ Chair Describes Goals, Supports NEPA Principles The Council on Environmental Quality (CEQ) wants Federal agencies to weave environmental considerations into everyday business, as opposed to conducting NEPA compliance as a distinct project to fend off lawsuits. Recently appointed CEQ Chair James L. Connaughton (Lessons Learned Quarterly Report, June 2001, page 12) described this and other key CEQ goals at a September 21, 2001, meeting with Federal agency NEPA Contacts. Mr. Connaughton made it clear that this administration supports NEPA’s principles “as much as all previous administrations.” In this connection, he referred to

276

Environmental Compliance Performance Scorecard - First Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - First Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2013 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Third

277

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First

278

Mixed Waste Management Facility groundwater monitoring report: Third quarter 1994  

SciTech Connect

Currently, 125 wells monitor groundwater quality in the uppermost aquifer beneath the Mixed Waste Management Facility (MWMF) at the Savannah River Site. Samples from the wells are analyzed for selected heavy metals, herbicides/pesticides, indicator parameters, radionuclides, volatile organic compounds, and other constituents. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents during third quarter 1994. Sixty-four (51%) of the 125 monitoring wells contained elevated tritium activities. Trichloroethylene concentrations exceeded the final PDWS in 22 (18%) wells. Chloroethene, 1,1-dichloroethylene, and tetrachloroethylene, elevated in one or more wells during third quarter 1994, also occurred in elevated levels during second quarter 1994. These constituents generally were elevated in the same wells during both quarters. Gross alpha, which was elevated in only one well during second quarter 1994, was elevated again during third quarter. Mercury, which was elevated during first quarter 1994, was elevated again in one well. Dichloromethane was elevated in two wells for the first time in several quarters.

Not Available

1994-12-01T23:59:59.000Z

279

NEAMS Quarterly Report for October-December 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes updates, highlights, fuels and reactors product line accomplishments, integration accomplishments, recent and upcoming milestones.

280

NEAMS Quarterly Report for October-December 2012  

Energy.gov (U.S. Department of Energy (DOE))

TheNuclear Energy Advanced Modeling and Simulation (NEAMS)quarterly report includes updates, highlights, fuels and reactors product line accomplishments, integration accomplishments, recent and...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

NEAMS Quarterly Report for January-March 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes updates, highlights, fuels and reactors product line accomplishments, integration accomplishments, recent and upcoming milestones.

282

Wind Program Newsletter: Third Quarter 2011 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Newsletter: Third Quarter 2011 Department of Energy Awards 43 Million to Spur Offshore Wind Energy In the News Current R&D Funding Opportunities Recent Publications...

283

Natural gas imports and exports: First quarter report 1995  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This quarter`s focus is market penetration of gas imports into New England. Attachments show the following: % takes to maximum firm contract levels and weighted average per unit price for the long-term importers, volumes and prices of gas purchased by long-term importers and exporters, volumes and prices for gas imported on short-term or spot market basis, and gas exported short-term to Canada and Mexico.

NONE

1995-07-01T23:59:59.000Z

284

Quarterly Update for January, February, and March 2014 - DOE...  

NLE Websites -- All DOE Office Websites (Extended Search)

January, February, and March 2014 by Diane Johnson PDF document icon Directives Quarterly Update for Jan-Feb-Mar 2014.pdf - PDF document, 264 KB (271096...

285

Quarterly Update for April, May, and June - DOE Directives, Delegation...  

NLE Websites -- All DOE Office Websites (Extended Search)

April, May, and June by Diane Johnson PDF document icon Directives Quarterly Update for April-May-June 2014.pdf - PDF document, 271 KB (277782...

286

NEAMS Quarterly Report for April-June 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes updates, highlights, fuels and reactors product line accomplishments, integration accomplishments, recent and upcoming milestones.

287

3rd Quarter 2014 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

Form EIA-851A and Form EIA-851Q, ""Domestic Uranium Production Report.""" " U.S. Energy Information Administration 3rd Quarter 2014 Domestic Uranium Production Report...

288

PBL FY 2003 Third Quarter Review Forecast of Generation Accumulated...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Financial-Based Cost Recovery Adjustment Clause (FB CRAC) and Safety-Net Cost Recovery Adjustment Clause (SN CRAC) FY 2003 Third Quarter Review Forecast in Millions...

289

PBL FY 2002 Third Quarter Review Forecast of Generation Accumulated...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Business Line Generation Accumulated Net Revenues Forecast for Financial-Based Cost Recovery Adjustment Clause (FB CRAC) FY 2002 Third Quarter Review Forecast in Millions...

290

FY 2004 Second Quarter Review Forecast of Generation Accumulated...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Financial-Based Cost Recovery Adjustment Clause (FB CRAC) and Safety-Net Cost Recovery Adjustment Clause (SN CRAC) FY 2004 Second Quarter Review Forecast In Millions...

291

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA process. This issue examines some recent developments and practices in the use of GIS for NEPA and related environmental reviews. December 2, 2013 Lessons Learned Quarterly...

292

NEAMS Quarterly Report for July-September 2012  

Energy.gov (U.S. Department of Energy (DOE))

The NEAMS quarterly report includes highlights, a spotlight on personal achievements, accomplishments, recent and upcoming milestones, and a technical spotlight on modeling precipitate nucleation.

293

Lessons Learned Quarterly Report, June 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51st quarterly report on lessons learned in the NEPA process. This issue features collaboration as a key element of a successful NEPA process. Related articles discuss approaches...

294

Development of a synthetic fuel reciprocating charge pump. Quarterly technical progress report for the period of: 1 January 1987--31 March 1987  

SciTech Connect

This report covers the third quarter of the third phase of the reciprocating charge pump improvement program. The program was begun in 1982 for the purpose of improving the operating life of packings and plungers used in 300 psig, 300F coal/solvent slurry pumps employed in synthetic fuel generating plants. The testing to be performed during this phase has been modified since the last quarterly report. This test measured the effects of slurry migration past the floating piston seal and the time to wear the packing and plunger beyond the acceptable limit. Table 1 summarizes all testing to date, 456 hours total at this time with 72 hours on 35% slurry. It denotes the valve problems seen with rapid pressure decay when pumping slurry. Throughout this time, 33 specific and different equipment failures and operation problems occurred that delayed the testing.

Bonney, G.E.

1987-12-31T23:59:59.000Z

295

Digital Surveying Directional Surveying Specialists | Open Energy  

Open Energy Info (EERE)

Digital Surveying Directional Surveying Specialists Digital Surveying Directional Surveying Specialists Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Digital Surveying Directional Surveying Specialists Author Directional Surveying Specialists Published Publisher Not Provided, 2012 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Digital Surveying Directional Surveying Specialists Citation Directional Surveying Specialists. Digital Surveying Directional Surveying Specialists [Internet]. 2012. [cited 2013/10/08]. Available from: http://www.digitalsurveying.co.za/services/geophysical-borehole-surveying/overview/optical-televiewer/ Retrieved from "http://en.openei.org/w/index.php?title=Digital_Surveying_Directional_Surveying_Specialists&oldid=690244"

296

Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter  

SciTech Connect

This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 Occurrence Reporting and Processing of Operations Information requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

Lisbeth A. Mitchell

2013-11-01T23:59:59.000Z

297

BNL | Center for Functional Nanomaterials Hours of Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

CFN Hours of Operation CFN Hours of Operation Normal working hours at the CFN are 8 a.m. to 6 p.m. Working Outside of Normal Hours CFN scientific and technical personnel, as well as external users, may need to work outside of normal operating hours, during which time support is limited and many colleagues may not be around. Therefore, working outside the 8 a.m. to 6 p.m. envelope on weekdays, or anytime on weekends and holidays, requires special precautions, especially if working in a laboratory. CFN users are expected to work at the CFN during normal working hours. Users with extensive experience working at the CFN may be granted permission by the appropriate facility leader and ES&H Coordinator to work after hours. Users first must complete the Request to Work After-Hours at

298

FTCP Quarterly Report on Federal Technical Capability, February 24, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

299

Energy Emergency Preparedness Quarterly Vol 3, Issue 1- January 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and Energy Restoration (ISER) Division of the Office of Electricity Delivery and Energy Reliability (OE) to highlight a few of the OE/ISER energy preparedness activities that occur each quarter.

300

The Savannah River Site's Groundwater Monitoring Program, third quarter 1991  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

Not Available

1992-02-17T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Energy Emergency Preparedness Quarterly Vol 2, Issue 4- October 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Emergency Preparedness Quarterly is published by the Infrastructure Security and Energy Restoration (ISER) Division of the Office of Electricity Delivery and Energy Reliability (OE) to highlight a few of the OE/ISER energy preparedness activities that occur each quarter.

302

FTCP Quarterly Report on Federal Technical Capability, November 20, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

303

FTCP Quarterly Report on Federal Technical Capability, March 6, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

304

FTCP Quarterly Report on Federal Technical Capability, August 8, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

305

FTCP Quarterly Report on Federal Technical Capability, May 30, 2012  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

306

FTCP Quarterly Report on Federal Technical Capability, September 2, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

307

FTCP Quarterly Report on Federal Technical Capability, July 3, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

308

FTCP Quarterly Report on Federal Technical Capability, December 15, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This Quarterly Report on the Federal Technical Capability Program (FTCP) contains information on the status of qualifications in the Technical Qualification Program (TQP) and technical skill gaps, on a quarterly basis. Report also displays trend data for overall TQP qualification and staffing shortfalls.

309

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

2 2 U.S. Energy Information Administration / 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Table 1. Total production of uranium concentrate in the United States, 1996 - 3rd Quarter 2013 pounds U 3 O 8 Calendar-Year Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Calendar-Year Total 1996 1,734,427 1,460,058 1,691,796 1,434,425 6,320,706 1997 1,149,050 1,321,079 1,631,384 1,541,052 5,642,565 1998 1,151,587 1,143,942 1,203,042 1,206,003 4,704,574 1999 1,196,225 1,132,566 1,204,984 1,076,897 4,610,672 2000 1,018,683 983,330 981,948 973,585 3,975,545 2001 709,177 748,298 628,720 553,060 2,639,256 2002 620,952 643,432 579,723 E500,000 E2,344,107 2003 E400,000 E600,000 E400,000 E600,000

310

Survey Consumption  

Gasoline and Diesel Fuel Update (EIA)

fsidentoi fsidentoi Survey Consumption and 'Expenditures, April 1981 March 1982 Energy Information Administration Wasningtoa D '" N """"*"""*"Nlwr. . *'.;***** -. Mik>. I This publication is available from ihe your COr : 20585 Residential Energy Consumption Survey: Consum ption and Expendi tures, April 1981 Through March 1982 Part 2: Regional Data Prepared by: Bruce Egan This report was prepared by the Energy Information Administra tion, the independent statistical

311

OE Releases Third Issue of Energy Emergency Preparedness Quarterly (July  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Issue of Energy Emergency Preparedness Quarterly Third Issue of Energy Emergency Preparedness Quarterly (July 2012) OE Releases Third Issue of Energy Emergency Preparedness Quarterly (July 2012) July 13, 2012 - 12:45pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released the third issue of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter. The third issue of the EEPQ includes news items on the release of the Electricity Cybersecurity Risk Management Process guideline and the Electricity Cybersecurity Capability Maturity Model, and the National Energy Assurance Conference and 3rd Electric Infrastructure Security Summit, both co-sponsored by DOE. All issues of the EEPQ are available for download from the Emergency

312

Lessons Learned Quarterly Report, June 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1998 1998 Lessons Learned Quarterly Report, June 1998 Welcome to the second quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NCO Meeting in DC The Role of the NCO Special Considerations in Applying Categorical Exclusions NEPA Training Anticipated DOE-wide NEPA Contracts Integrating NEPA with Other Reviews Advice from GC NRC Adopts DOE NEPA Documents at NEEL Alternative Dispute Resolution Clean Air Act Conformity Requirements Ecological Society Briefing NAPA Evaluates DOE NEPA Program NEPA Guidance Updates Litigation Updates Second Quarter FY98 Questionnaire Results EIS-related Documents Recent EIS Milestones EA Completion Times and Costs Lessons Learned Quarterly Report (LLQR) More Documents & Publications ADR Revised Policy

313

NEPA Success Stories from Lessons Learned Quarterly Reports | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports This document contains a compilation of NEPA "success stories" that were featured in DOE Lessons Learned Quarterly Reports (LLQRs). Feature articles in LLQR have described how the NEPA process provided an organized structure for making some of the Department's most complex decisions. NEPA reviews have resulted in significant project cost savings through informed decision making. Some articles have highlighted ways in which the NEPA process improved environmental outcomes, such as by identifying better alternatives or more effective mitigation. Some articles have put the spotlight on procedural success, such as effective public

314

Lessons Learned Quarterly Report, March 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2009 Lessons Learned Quarterly Report, March 2009 Lessons Learned Quarterly Report, March 2009 Welcome to the 58th quarterly report on lessons learned in the NEPA process. We have been very busy addressing our NEPA responsibilities arising from the recovery act as well as the new policies of the obama administration. In this issue of the Lessons Learned Quarterly Report (LLQR), we share ideas and experiences that will foster an improved and expedited NEPA compliance process. Articles included in this issue: NEPA Efficiency Essential to Recovery Plan NEPA Opportunities in a New Era of Openness Secretary Chu to DOE Employees: "Help Turn the Ship" Secretary Chu Pledges to Improve DOE Management New DOE-Wide NEPA Support Contracts! Sutley Brings Breadth of Government Experience to CEQ

315

Lessons Learned Quarterly Report, March 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 1998 Lessons Learned Quarterly Report, March 1998 Lessons Learned Quarterly Report, March 1998 Welcome to the first quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Managing Progress on the Repository EIS Richland EA: Public Involvement and Classified Information WIPP and WM RODs Issued DOE-wide NEPA Contracts Update Early NEPA Review Saves Resources Technical Assistance from Core Technical Group Recent NEPA Guidance EPA Proposes Changes to Voluntary EIS Policy Anticipating the Discovery of Unknown Waste DOE Planning Summaries Provide NEPA Forecasts Recent EIS Milestones NAEP Identifies Accepted NEPA Practices Environmental Restoration's NCO Describes His Role Richlands NEPA Process Game Enlivens Training Transitions

316

Lessons Learned Quarterly Report, March 2000 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2000 Lessons Learned Quarterly Report, March 2000 Lessons Learned Quarterly Report, March 2000 Welcome to the 22nd Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources DOE Inspector General Report Questions Categorical Exclusion Application DOE Decides Disposition of Surplus Plutonium Interview with New NEPA Director at CEQ Transitions DOE Issues Decisions on Low-level and Mixed Low-level Waste Waste Isolation Pilot Plant's 25-Year History Considering Essential Fish Habitat in NEPA Reviews NEPA Guidance Updates Web Site of Interest DOE-wide NEPA Contracts Update Training Opportunities DOE Litigation Updates Other NEPA Cases EAs and EISs Completed This Quarter

317

Lessons Learned Quarterly Report, September 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Lessons Learned Quarterly Report, September 1996 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: Defense Programs NCO Fosters Teamwork through Meetings Internal Scoping at Richland Visual Excellence Responding to Comments on DOE EISs Improving Comment Resolution with EPA EPA Commends DOE for "Model" Pollution Prevention Analysis Litigation Updates 1996 Federal Environmental Quality Award Winners: USACE and MMS Amended Rule Streamlines DOE NEPA Process Book Review: Environmental Impact Assessment Third quarter FY 1996 Lessons Learned Questionnaire results, including EIS and EA cost and time reports, and analysis models and codes used in DOE EAs and EISs

318

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3rd Quarter 2010 3rd Quarter 2010 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2012

319

Lessons Learned Quarterly Report, June 1999 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1999 1999 Lessons Learned Quarterly Report, June 1999 Welcome to the second quarter FY 1999 Quarterly Report on lessons learned in the NEPA process. In addition to the articles beginning on page 1, this issue includes: Consolidated Decision Ends Tritium Trilogy Tale NEPA and Habitat Management Plan: Environmental Synergy Advisory Council on Historic Preservation Revises Section 106 Regulations Mini-guidance Plain Language for NEPA Federal Register Notices Distributing a Record of Decision A Helpful Hint for EIS Glossaries New Books for the NEPA Practitioners Bookshelf DOE-wide NEPA Contracts Update Court Allows WIPP to Open Transitions at the CEQ EH Electronic Publishing Standards and Guidelines Training Opportunities Documents Issued, Second Quarter FY 1999 Second Quarter FY 1999 Questionnaire Results

320

75th Lessons Learned Quarterly Report Issued | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5th Lessons Learned Quarterly Report Issued 5th Lessons Learned Quarterly Report Issued 75th Lessons Learned Quarterly Report Issued June 3, 2013 - 4:11pm Addthis The 75th quarterly report on lessons learned in the NEPA process was issued on June 3, 2013. This issue of Lessons Learned Quarterly Report (LLQR) includes articles on recent guidance by the Council on Environmental Quality and Advisory Council on Historic Preservation to promote better integration of NEPA and Section 106 reviews, and on the Federal Highway Administration's Every Day Counts intitiative to better integrate planning and NEPA. "Efforts such as these to improve NEPA implementation are indicative of what we strive for at DOE every day -- better NEPA review, better decisions," said Carol Borgstrom, Director, Office of NEPA Policy and

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Quarterly Coal Distribution Report July … September 2013  

Gasoline and Diesel Fuel Update (EIA)

January 2014 January 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report July - September 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Distribution Report 3 rd Quarter 2013 Quarterly Coal Distribution Table Format and Data Sources In keeping with EIA's efforts to increase the timeliness of its reports, this Quarterly Coal Distribution Report is a preliminary

322

77th Lessons Learned Quarterly Report Issued | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77th Lessons Learned Quarterly Report Issued 77th Lessons Learned Quarterly Report Issued 77th Lessons Learned Quarterly Report Issued December 3, 2013 - 3:18pm Addthis The 77th quarterly report on lessons learned in the NEPA process was issued on December 2, 2013. This issue of Lessons Learned Quarterly Report (LLQR) examines positive outcomes of the NEPA process. Featured articles include a review by the Office of NEPA Policy and Compliance of nearly 400 excerpts from questionnaire responses published in LLQR during the past 10 years regarding the usefulness and effectiveness of the NEPA process. An overwhelming majority of the questionnaire responses describe positive outcomes and illustrate that we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment.

323

Financial News for Major Energy Companies, Second Quarter 2006  

Gasoline and Diesel Fuel Update (EIA)

Second Quarter 2006 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or do not provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $30.1 billion on revenues of $297.1 billion during the second quarter of 2006 (Q206). The level of net income for Q206 was 36 percent higher than in the second quarter of 2005 (Q205) (Table 1). Net income for Q206 increased primarily as a result of higher crude oil

324

High flux isotope reactor: Quarterly report October through December 1986  

SciTech Connect

Two routine cycles of operation of the HFIR reactor were completed during the quarter. The shutdowns to end these cycles were both scheduled. The end-of-cycle 287 shutdown was extended indefinitely to investigate the embrittlement of reactor vessel materials due to radiation damage. The reactor remains down at the end of the quarter. Following the scheduled end-of-cycle 287 shutdown period, subsequent shutdown time was designated as unscheduled. The two scheduled shutdowns, fourth quarter downtime resulting from a third quarter scheduled shutdown, and the extended unscheduled shutdown account for the low 44.2% on-stream time for the quarter. The scheduled control plate replacement and vessel internals inspection was completed at the end-of-cycle 287. The inspection revealed a blister on control cylinder 9. This flaw was attributed to a manufacturing defect.

Corbett, B.L.; Farrar, M.B.

1987-04-01T23:59:59.000Z

325

Quarterly Coal Distribution Report April … June 2013  

U.S. Energy Information Administration (EIA) Indexed Site

October 2013 October 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report April - June 2013 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. iii U.S. Energy Information Administration | Quarterly Coal Distribution Report 2 nd Quarter 2013 Quarterly Coal Distribution Table Format and Data Sources In keeping with EIA's efforts to increase the timeliness of its reports, this Quarterly Coal Distribution Report is a preliminary

326

Electric Power Quarterly, April-June 1986  

SciTech Connect

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1986-10-28T23:59:59.000Z

327

Electric power quarterly, January-March 1987  

SciTech Connect

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1987-07-27T23:59:59.000Z

328

Electric power quarterly, October-December 1986  

SciTech Connect

In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis. The report also presents a quarterly summary of disturbances and unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on the Form IE-417.

Not Available

1987-04-08T23:59:59.000Z

329

Anaerobic treatment of gasifier effluents. Quarterly report  

SciTech Connect

This report summarizes the work performed during the quarter ending December 30, 1981. The major efforts have been directed toward the continued acclimation of two anaerobic treatment systems, start up of a third anaerobic treatment system, GC/MS characterization of the coal gasification wastewater, data acquisition for determination of distribution coefficients for the extraction of phenol from the wastewater using MIBK, and preliminary design of a solvent extraction system for wastewater pretreatment. The progress of these efforts are depicted in the Gannt Chart, along with project expenditures for the above contract, and are presented in detail in the following sections.

Cross, W.H.; Chian, E.S.K.; Pohland, F.G.; Giabbai, M.; Harper, S.R.; Kharkar, S.; Cheng, S.S.; Shuey, P.S.

1982-01-01T23:59:59.000Z

330

Performance indicators, third quarter CY-1991  

SciTech Connect

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide uniform system of Performance Indicators (PI's) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities'' be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

331

Performance indicators, third quarter CY-1991  

SciTech Connect

Secretary of Energy Notice (SEN-29-91) directed that a Department- wide ``uniform system of Performance Indicators (PI`s) for trending and analyzing operational data to help assess and support progress in improving performance and in strengthening line management control of operations relating to environmental safety, and health activities`` be developed. This Performance Indicator Report represents a compilation of data for the third quarter of calendar year 1991 for the following Lawrence Berkeley Laboratory (LBL) facilities: (1) Bevalac, (2) 88-Inch Cyclotron, (3) Materials Sciences Division.

Not Available

1992-01-01T23:59:59.000Z

332

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-07-01T23:59:59.000Z

333

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-04-01T23:59:59.000Z

334

Taxpayer Subsidies for US Films with Tobacco Imagery  

E-Print Network (OSTI)

from the Current Employment Statistics Survey. MotionLabor Statistics. Quarterly Census of Employment and Wages:of Labor Statistics. State and Area Employment, Hours, and

Polansky, Jonathan; Glantz, Stanton A. Ph.D.

2009-01-01T23:59:59.000Z

335

Rate enhancement for catalytic upgrading coal naphthas. Quarterly progress report, July--September 1992  

SciTech Connect

During this quarter, hydrotreatment of the Black Thunder naphtha sample was carried out using two commercial catalysts. Also, the Illinois No. 6 naphtha were hydrotreated using unsupported transition metal sulfides. Each reaction condition was maintained for 24 hours and three steady state samples were taken in the last 6 hours of the 24 hours period to calculate the removal of the heteroatoms for each condition. Prior to G.C. analysis, the samples were washed three times with distilled water to remove dissolved H{sub 2}S and NH{sub 3}. Two commercial catalysts, a Co-Mo on alumina (American Cyanamid HDS-1442A, 1/16in. {times} 1/4in. pellets) and a Ni-W on alumina (Harshaw Catalyst, Ni-4301, E 1/12, Lot 16, Drum 29) were employed in the processing of the Black Thunder naphtha samples. Analytical data for these catalysts are presented in Table 1. Unsupported transition metal sulfides were prepared following the procedure published by Chianelli et al.

Davis, B.H.

1992-12-31T23:59:59.000Z

336

National Bioenergy Center Biochemical Platform Integration Project: Quarterly Update #24, July-September 2009  

SciTech Connect

July to September, 2009 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter.

Schell, D.

2009-10-01T23:59:59.000Z

337

Climate Survey  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Employee Operations Employee Climate Survey March 2009 Acknowledgements The Berkeley Lab Survey Team consisted of the following: Jim Krupnick, Sponsor Vera Potapenko, Project Lead Karen Ramorino, Project Manager Chris Paquette, MOR Associates Alexis Bywater, MOR Associates MOR Associates, an external consulting firm, acted as project manager for this effort, analyzing the data and preparing this report. MOR Associates specializes in continuous improve- ment, strategic thinking and leadership development. MOR Associates has conducted a number of large-scale surveys for organizations in higher education, including MIT, Stanford, the University of Chicago, and others. MOR Associates, Inc. 462 Main Street, Suite 300 Watertown, MA 02472 tel: 617.924.4501

338

DOE/EIA-0202(90/2Q) SHOET-TERM QUARTERLY PROJECTIONS  

Gasoline and Diesel Fuel Update (EIA)

0/2Q) 0/2Q) SHOET-TERM QUARTERLY PROJECTIONS This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the Hearing Impaired Only: (202) 586-1181 8 a.m. - 5 p.m., eastern time, M-F

339

Hospital Triage in First Hours After Nuclear or Radiological...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hospital Triage in the First 24 Hours after a Nuclear or Radiological Disaster Medical professionals with the Radiation Emergency Assistance CenterTraining Site (REACTS) at the...

340

Delayed Start or Cancellation of Business Hours | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

if you have questions. When regular business hours are suspended The laboratory may not conduct regular operations because of inclement weather. In this case, employees are not...

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Lessons Learned Quarterly Report, March 2002, Issue No. 30, First Quarter FY 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2002 March 1, 2002; Issue No. 30 LESSONS LEARNED LEARNED LESSONS CEQ Guidance Encourages Agency Cooperation DOE Experience Is Generally Positive Better cooperation and coordination – always a good idea in the NEPA process – is given an extra boost by the Council on Environmental Quality (CEQ) in new guidance. James Connaughton, CEQ Chair, in a January 30, 2002, letter to Heads of Federal Agencies, underscores the benefits of enhanced cooperating agency involvement in the NEPA process. These benefits, including analytical and process efficiencies, improved trust among stakeholders, and greater likelihood of successful implementation of a proposed action, extend to both

342

Lessons Learned Quarterly Report, Issue No. 32; Third Quarter FY 2002 (September 3, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2002 September 2002 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Third Quarter FY 2002 September 3, 2002; Issue No. 32 LESSONS LEARNED LEARNED LESSONS continued on page 3 NEPA Community Meeting Addresses Reform Initiatives James Connaughton, CEQ Chair, urged linking NEPA with EMS. Challenged to “Reform and Re-energize NEPA Implementation,” more than 150 members of the DOE NEPA Community convened in Washington, DC, on July 16 and 17, 2002, at the annual meeting sponsored by the Office of NEPA Policy and Compliance. Highlights of the meeting included presentations by James Connaughton, Chair, Council on Environmental Quality (CEQ), and the senior environmental advisor to the President; and Robert Card, Under Secretary for Energy,

343

NEPA Lessons Learned Quarterly Report; Third Quarter FY 2003 (September2, 2003)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2003 September 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Third Quarter FY 2003 September 2, 2003; Issue No. 36 LESSONS LEARNED LEARNED LESSONS DOE NEPA Community Gauges Progress In Its Continuing Pursuit of Excellence continued on page 3 "I believe we will never get to a point where we say this is done, there is nothing left to learn." - Beverly Cook "Are We There Yet?" - that is, has DOE achieved its goals for NEPA process improvement? - was the theme of the DOE NEPA Community Meeting on July 15 and 16, 2003. Participants considered DOE's NEPA performance with respect to multiple objectives using a variety of measures, finding both substantial progress and room for improvement. The meeting included

344

NEPA Lessons Learned Quarterly Report; Issue No. 37; Fourth Quarter FY 2003 (12/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2003 December 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2003 December 1, 2003; Issue No. 37 LESSONS LEARNED LEARNED LESSONS What's Next? CEQ Seeks More Input on Task Force Recommendations continued on page 3 NEPA practitioners, agencies, special interest groups, and the general public are reacting to recommendations intended to improve and modernize NEPA implementation presented in the NEPA Task Force Report to the Council on Environmental Quality: Modernizing NEPA Implementation, issued in September 2003. Through a series of meetings and regional roundtable discussions, CEQ is now seeking broad input on what should be done, how it should be done, and with what priority. Noting that the Report was to,

345

Microsoft Word - Apr-June 2012 Monticello Quarterly_S09178_FFA -final.doc  

Office of Legacy Management (LM)

2 2 June 2012 Doc. No. S09178 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement Quarterly Report: April 1-June 30, 2012 1.0 Introduction This report summarizes the status of the Monticello Vicinity Properties (MVP) and the Monticello Mill Tailings Site (MMTS), located in and near Monticello, Utah, for the period of April through June 2012. The report also includes a summary of projected near-term activity and reporting requirements. Quarterly reports are submitted to the U.S. Environmental Protection Agency (EPA) and the Utah Department of Environmental Quality (UDEQ) to apprise project managers of project status and near-term schedule of activities and reporting requirements. The MMTS and MVP were placed on the EPA National Priorities List (NPL) in 1989 and 1986,

346

Lessons Learned Quarterly Report; Fourth Quarter FY 2002; December 2, 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2002 December 2, 2002; Issue No. 33 LESSONS LEARNED LEARNED LESSONS CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely continued on page 5 In response to questions from the Council on Environmental Quality's (CEQ's) NEPA Task Force, Federal, state, local, and tribal agencies, environmental and business groups, and individual citizens have weighed in during the past few months with opinions on how to improve NEPA implementation. CEQ also sought and received examples of best practices and case studies. Collectively, the comments cover nearly every aspect of NEPA implementation. They range from strong support for the value of the NEPA process to sharp criticism,

347

NEPA Lessons Learned Quarterly Report, March 1, 2004; Issue No. 38; First Quarter FY 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2004 March 2004 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2004 March 1, 2004; Issue No. 38 LESSONS LEARNED LEARNED LESSONS Need Help Preparing NEPA Documents? New, Improved "Green Book" Is on the Way (continued on page 15) By: Carl Sykes, Office of NEPA Policy and Compliance Carl Sykes is leading the charge to strengthen the Green Book, DOE's NEPA primer. The time has come for the DOE NEPA Community to work together to strengthen our basic NEPA guidebook, Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements (also known as the "Green Book"). The Green Book (www.eh.doe.gov/nepa under Guidance) is certainly no weakling: it provides succinct recommendations for key

348

NEPA Lessons Learned Quarterly Report; Third Quarter 2000 (09/01/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Lessons Learned September 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2000 September 1, 2000; Issue No. 24 NEPA staff positions open. Apply by September 8. See page 2. Emergency NEPA Procedures Invoked for Actions Taken after Los Alamos Fire To avert further harm in the wake of the May 2000 Los Alamos wildfire, DOE is taking emergency actions with potentially significant impacts, without preparing an EIS. Instead, DOE is proceeding under “alternative arrangements” to comply with NEPA, as provided under 40 CFR 1506.11, a section of the Council on Environmental Quality (CEQ) NEPA regulations that deals with emergency circumstances. The specific alternative

349

NEPA Lessons Learned Quarterly Report September 2001, No. 27, Third Quarter FY 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA NEPA Lessons Lear ned September 2001 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2001 September 4, 2001; Issue No. 28 continued on page 2 NEPA Compliance Officers Consider Further Improvements "What's New, What's Next," was the theme of the Department of Energy (DOE) NEPA Compliance Officers (NCOs) meeting on June 13 and 14, 2001, in Washington, DC. Convened by the Office of NEPA Policy and Compliance, the meeting involved 70 participants including Program and Field Office NCOs, Headquarters NEPA attorneys, and others. In welcoming participants, Carol Borgstrom, Director, Office of NEPA Policy and Compliance, recounted recent goals for DOE's NEPA Compliance Program before considering new challenges. She noted that in the 1990s, the Department achieved significant improvements

350

Lessons Learned Quarterly Report; March 3, 2003; Issue No. 34; First Quarter FY 2003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Lear Lessons Lear ned March 2003 1 wealth of information that informs the NEPA process, he explained. Mr. Greczmiel told the workshop audience that the CEQ NEPA Task Force, which he directs, has looked at ways EMS could improve NEPA implementation. An EMS can improve relations with local communities, especially with regulators, who appreciate the Federal effort to address environmental issues systematically, he said. Another benefit of an EMS, he noted, is that it can provide methods for following up NEPA's predictive analysis. National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2003 March 3, 2003; Issue No. 34 LESSONS LEARNED LEARNED LESSONS New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed

351

Electric Power Quarterly, October-December 1985. [Glossary  

SciTech Connect

The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. Data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

Not Available

1986-05-05T23:59:59.000Z

352

Natural gas imports and exports, fourth quarter report 1999  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-03-01T23:59:59.000Z

353

Natural gas imports and exports, third quarter report 2000  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-12-01T23:59:59.000Z

354

Natural gas imports and exports, first quarter report 2000  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

None

2000-06-01T23:59:59.000Z

355

Credit Based; Beginning Swimming Credit/Hours Class  

E-Print Network (OSTI)

Center Pool Course Description: Beginning swimming skills and water safety. Prerequisites: Must about experience at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be postedCredit Based; Beginning Swimming Credit/Hours Class Title Lead Instructor Phone Email Office Hours

Maxwell, Bruce D.

356

Quarterly Coal Report, October-December 1997  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

357

Quarterly Coal Report October-December 2000  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 2000 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Betsy O'Brien, Director, Coal, Electric and Renewables Division, Office of Coal, Nuclear, Electric and Alternate Fuels. Questions addressing the Appendix A, U.S. Coal Imports section

358

Quarterly Coal Report October-December 1996  

Gasoline and Diesel Fuel Update (EIA)

4Q) 4Q) Distribution Category UC-950 Quarterly Coal Report October-December 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Acting Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Specific information about

359

Quarterly Coal Report, January-March 1998  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1998 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

360

Quarterly Coal Report, January-March 1997  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Acting Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Quarterly Coal Report January-March 1996  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Distribution Category UC-950 Quarterly Coal Report January-March 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Noel C. Balthasar, Chief, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Electric and Alter- nate Fuels. Specific information about

362

Quarterly Coal Report, July-September 1997  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Distribution Category UC-950 Quarterly Coal Report July-September 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts This publication was prepared by Paulette Young under the direction of Mary K. Paull, Project Leader, Coal Data Branch, Coal and Electric Data and Renewables Division, Office of Coal, Nuclear, Elec- tric and Alternate Fuels. Questions addressing the

363

HYBRID SULFUR ELECTROLYZER DEVELOPMENT FY09 SECOND QUARTER REPORT  

SciTech Connect

The primary objective of the DOE-NE Nuclear Hydrogen Initiative (NHI) is to develop the nuclear hydrogen production technologies necessary to produce hydrogen at a cost competitive with other alternative transportation fuels. The focus of the NHI is on thermochemical cycles and high temperature electrolysis that can be powered by heat from high temperature gas reactors. The Savannah River National Laboratory (SRNL) has been tasked with the primary responsibility to perform research and development in order to characterize, evaluate and develop the Hybrid Sulfur (HyS) thermochemical process. This report documents work during the first quarter of Fiscal Year 2009, for the period between January 1, 2009 and March 31, 2009. The HyS Process is a two-step hybrid thermochemical cycle that is part of the 'Sulfur Family' of cycles. As a sulfur cycle, it uses high temperature thermal decomposition of sulfuric acid to produce oxygen and to regenerate the sulfur dioxide reactant. The second step of the process uses a sulfur dioxide depolarized electrolyzer (SDE) to split water and produce hydrogen by electrochemically reacting sulfur dioxide with H{sub 2}O. The SDE produces sulfuric acid, which is then sent to the acid decomposer to complete the cycle. The DOE NHI program is developing the acid decomposer at Sandia National Laboratory for application to both the HyS Process and the Sulfur Iodine Cycle. The SDE is being developed at SRNL. During FY05 and FY06, SRNL designed and conducted proof-of-concept testing for a SDE using a low temperature, PEM fuel cell-type design concept. The advantages of this design concept include high electrochemical efficiency, small footprint and potential for low capital cost, characteristics that are crucial for successful implementation on a commercial scale. During FY07, SRNL extended the range of testing of the SDE to higher temperature and pressure, conducted a 100-hour longevity test with a 60-cm{sup 2} single cell electrolyzer, and designed and built a larger, multi-cell stack electrolyzer. During FY08, SRNL continued SDE development, including development and successful testing of a three-cell electrolyzer stack with a rated capacity of 100 liters per hour. The HyS program for FY09 program will address improving SDE performance by focusing on preventing or minimizing sulfur deposition inside the cell caused by SO{sub 2} crossover, reduction of cell voltage for improved efficiency, an extension of cell operating lifetime. During FY09 a baseline technology development program is being conducted to address each of these issues. Button-cell (2-cm{sup 2}) and single cell (60-cm{sup 2}) SDEs will be fabricated and tested. A pressurized button-cell test facility will be designed and constructed to facilitate addition testing. The single cell test facility will be upgraded for unattended operation, and later for operation at higher temperature and pressure. Work will continue on development of the Gas Diffusion Electrode (GDE), or Gap Cell, as an alternative electrolyzer design approach that is being developed under subcontract with industry partner Giner Electrochemical Systems. If successful, it could provide an alternative means of preventing sulfur crossover through the proton exchange membrane, as well as the possibility for higher current density operation based on more rapid mass transfer in a gas-phase anode. Promising cell components will be assembled into membrane electrode assemblies (MEAs) and tested in the single cell test facility. Upon modification for unattended operation, test will be conducted for 200 hours or more. Both the button-cell and modified single cell facility will be utilized to demonstrate electrolyzer operation without sulfur build-up limitations, which is a Level 1 Milestone.

Herman, D; David Hobbs, D; Hector Colon-Mercado, H; Timothy Steeper, T; John Steimke, J; Mark Elvington, M

2009-04-15T23:59:59.000Z

364

Lessons Learned Quarterly Report, December 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2007 Lessons Learned Quarterly Report, December 2007 Lessons Learned Quarterly Report, December 2007 Welcome to the 53rd quarterly report on lessons learned in the NEPA process. Many in the Department's NEPA Community were called on to give extraordinary time and resources to the preparation of key EISs issued recently and highlighted in this LLQR. We anticipate a busy 2008 as well. As always, we welcome your suggestions for further improvement. Included in this issue: Multiple, Complex EISs Support DOE Missions; What Will the New Year Bring? Consideration of Greenhouse Gas Emissions in DOE NEPA Documents Is Evolving OMB and OSTP Issue Risk Analysis Principles Feature: Key EISs Yucca Mountain EISs Clean Coal EISs Western Energy Corridors Programmatic EIS FONSI Not a Foregone Conclusion

365

Lessons Learned Quarterly Report, September 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2013 Lessons Learned Quarterly Report, September 2013 Lessons Learned Quarterly Report, September 2013 In this issue, we highlight DOE's NEPA performance metrics, including a historical perspective. As DOE NEPA practitioners strive to control time and cost while maintaining quality, this most recent NEPA metrics analysis shows that overall performance generally appears to have remained stable, notwithstanding a substantial workload. Articles in this issue include: 10 Years of NEPA Metrics: 2003-2012 DOE-wide NEPA Contracts Update Historical Perspective on EIS Completion Times Responding to Comments NEPA Search Tool NAEP Abstracts, Nominations Document Managers and CORs Eating the NEPA Elephant Web-based Scoping Meeting A Summer with NEPA Stakeholders Directory EAs and EISs Completed This Quarter

366

Quarterly Nuclear Deployment Summary, April 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 April 30, 2012 - 12:31pm Addthis Quarterly Nuclear Deployment Summary The U.S. NRC voted to approve the issuance of the COLs for Southern Nuclear's Vogtle Units 3 and 4 on February 9, 2012. The issuance marks the first COL ever to be issued and the construction of a new nuclear power plant in more than 30 years. SCE&G's V.C Summer Units 2 and 3 received approval for COLs on March 30, 2012, making them the second US new-build in 30 years. The Tennessee Valley Authority has revised the cost and time estimates of Unit 2 at the Watts Bar Nuclear Plant. The new schedule estimates the cost to be in the range of $4 billion with a completion date of late 2015. South Mississippi Electric Power Association (SMEPA) has signed a

367

Lessons Learned Quarterly Report, September 1995 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1995 September 1995 Lessons Learned Quarterly Report, September 1995 This quarterly report summarizes the lessons learned for documents completed between April 1 and June 30, 1995. It is based primarily on responses to the revised questionnaire that was provided for use during January 1995, and includes information on direct and indirect NEPA process costs and on total project costs. The report includes a Question and Answer section as well as guidance on selected topics. REPORT CONTENTS: NEPA Document Preparation Times NEPA Cost Data NEPA Document Content The Document Preparation Process Effectiveness of the NEPA Process Other Lessons Learned Lessons Learned Questions and Answers EISs Completed 3rd Quarter FY 1995 EAs Completed 3rd Quarter FY 1995

368

Quarterly Nuclear Deployment Summary, January 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 January 30, 2012 - 1:10pm Addthis Quarterly News The U.S. NRC voted to approve the amended AP1000 design certification on December 22, 2011. The Commission also announced the rule would be effective immediately after it was published in the Federal Register on December 30, 2011. A final rule for the GE-ABWR design certification amendment was approved and published in the Federal Register on December 16, 2011. The rule will become effective January 17, 2012. The condenser for Vogtle Unit 3 has been completed by Japan's Toshiba and began its journey from Sacheon to Savannah, Georgia on November 21. The condenser marks the first major component Toshiba has shipped for

369

Lessons Learned Quarterly Report, December 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Lessons Learned Quarterly Report, December 2002 Welcome to the 33rd quarterly report on lessons learned in the NEPA process. Have you noticed that NEPA has been in the news a lot lately? Although this issue of LLQR is longer than usual, I encourage you to read all the news, views, and lessons learned. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: CEQ Asks How to Improve NEPA Implementation; Responses Vary Widely DOE Cooperating Agency Report DOE Proposes Floodplain/Wetland Rule Revisions Adaptive Management and the NEPA Process Impact Mitigation at Los Alamos Institute Establishes NEPA Advisory Committee Office of Science Promotes Early NEPA Planning

370

Lessons Learned Quarterly Report, December 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2005 Lessons Learned Quarterly Report, December 2005 Lessons Learned Quarterly Report, December 2005 Welcome to the 45th quarterly report on lessons learned in the NEPA process. We thank all those who participated in the NEPA 35 conference. You made it successful. We hope you are as inspired as we are by the spirit of NEPA Section 101and the challenge to improve the implementation of NEPA. As always, we welcome your suggestions for continuous improvement. Articles included in this issue: NEPA 35: Back to Basics, Back to the Future Congressional NEPA Task Force Holds Final Hearings NEPA 35 Conference Highlights CEQ Chairman Connaughton's Keynote Address Plenary Sessions NECRAC Final Report Environmental Justice and Indian Country Training Sesssions Breakout Sessions

371

Lessons Learned Quarterly Report, June 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Lessons Learned Quarterly Report, June 2004 Welcome to the 39th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Articles included in this issue: "Open House" Format for Scoping Meetings Provides DOE Valuable Input for Yucca Rail EIS Lesson Learned from Lessons Learned Apply Common Sense: Reduce Unfamilar Abbreviations Carbon Sequestration Programmatic EIS The Libyan Connection: Emergency Action Needed NEPA Strategy Adjusts to Changing Circumstances Card Game Highlights Diversity at NEPA Clinic

372

Lessons Learned Quarterly Report, September 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Lessons Learned Quarterly Report, September 2004 Welcome to the 40th quarterly report on lessons learned in the NEPA process. That's 40 issues! Have you read them all? We are pleased to feature the July 2004 NEPA Community Meeting in this issue, as well as our annual update of the cumulative index to LLQR. Thank you for your continuing support. Articles included in this issue: DOE's NEPA Process - Getting Better and Better NEPA Community Meeting Highlights Awards for Contributions to DOE's NEPA Program Working with Cooperating Agencies e-NEPA Improves Access and Efficiency Getting Better Through Guidance More Thoughts on Getting Better and Better NEPA Office Shares Best Practices Lessons Learned from Lessons Learned Part 4

373

EDIN-USVI Clean Energy Quarterly | Open Energy Information  

Open Energy Info (EERE)

EDIN-USVI Clean Energy Quarterly EDIN-USVI Clean Energy Quarterly Jump to: navigation, search Name EDIN-USVI Clean Energy Quarterly Agency/Company /Organization National Renewable Energy Laboratory Sector Energy, Water Focus Area Buildings, Energy Efficiency - Utility, Economic Development, Energy Efficiency, Grid Assessment and Integration, People and Policy, Transportation, Renewable Energy, Biomass, Solar, - Solar Hot Water, - Solar Pv, Biomass - Waste To Energy, Wind Phase Bring the Right People Together, Evaluate Options, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Free; publicly available Website http://www.edinenergy.org/usvi Locality U.S. Virgin Islands References EDIN-USVI Clean Energy Quarterly[1] Contents 1 Overview 2 Highlights

374

Lessons Learned Quarterly Report, June 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Lessons Learned Quarterly Report, June 2005 Welcome to the 43rd quarterly report on lessons learned in the NEPA process. In this issue we take a look at our hard-working NEPA Compliance Officers, who share bits of wisdom (and a little humor) gained from their lessons learned implementing NEPA. Countless thanks to all NCOs for their dedication, flexibility, and perseverance. As always, we welcome your suggestions for continuous improvement. Articles in this issue include: Who Has More Than 500 Years of NEPA Experience? A Closer Look at the DOE NEPA Compliance Officers CEQ Asks Federal Agencies to Lead NEPA Modernization Congressional NEPA Task Force Earth Day 2005 EPA Rates Action Alternatives in Moab EIS Update on Cape Wind Project

375

Lessons Learned Quarterly Report, December 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2006 Lessons Learned Quarterly Report, December 2006 Lessons Learned Quarterly Report, December 2006 Welcome to the 49th quarterly report on lessons learned in the NEPA process. In this issue, we feature the initiation of three significant EISs: the Complex 2030 Supplemental Programmatic EIS, the Supplemental Yucca Mountain Repository EIS, and the expanded Yucca Mountain Rail EIS. As always, we welcome your suggestions for continuous improvement. Articles included in this issue: NNSA Pursues Complex 2030 Vision Through Supplemental Programmatic EIS Scoping Process Underway for Two Yucca Mountain EISs Address Sabotage and Terrorism in EISs and EAs Special Environmental Analysis for Emergency Actions CEQ Work Groups Develop NEPA Guidance EIS Study Emphasizes Need for Quality and Clarity

376

Lessons Learned Quarterly Report, March 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Lessons Learned Quarterly Report, March 2007 Welcome to the 50th quarterly report on lessons learned in the NEPA process. The Office of NEPA Policy and Compliance launched the Lessons Learned program in December 1994 to support continuous improvement in the NEPA process. The Office began by presenting cost and time metrics and "What Worked and What Didn't Work." Other features were soon introduced. As always, we hope you read all of LLQR, and we welcome your suggestions for further improvement. Articles included in this issue: Flexibility of NEPA Process Facilitates Decisions for Strategic Petroleum Reserve Expansion DOE Cooperating Agency Report to CEQ GNEP PEIS to Examine Nuclear Fuel Recycling Proposal

377

Lessons Learned Quarterly Report, June 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Lessons Learned Quarterly Report, June 2008 Welcome to the 55th quarterly report on lessons learned in the NEPA process. We are pleased to feature the recent NAEP conference, Changing Climates, thanks to our on-the-scene reporter Carolyn Osborne. There are also several articles related to global climate change and NEPA. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for further improvement. Articles included in this issue: Old NEPA Tools Still Work in a "Changing Climate" September Meeting: Making NEPA Work for DOE Strategic Petroleum Reserve Scoping Underappreciated Provisions of the CEQ Regulations CEQ Interagency Work Groups Make Progress

378

Program Update: 1st Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1st Quarter 2013 1st Quarter 2013 Program Update: 1st Quarter 2013 Inside this Update: Abandoned Uranium Mines Report to Congress: LM Wants Your Input; LM Discusses Management of LTS&M Records; LM Launches New Website Under energy.gov; Biological Monitoring at Amchitka Appears to Show Impacts from Fukushima Dai-ichi Incident; Completion of the CERCLA Natural Resource Damage Process at the Rocky Flats Site; Environmental Justice Activities; Mound Museum Volunteers: Preserving a Laboratory's Legacy; DOE Evaluates Environmental Impacts of Uranium Mining on Government Land in Western Colorado; Solar Photovoltaic System at Tuba City Site; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during

379

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 Cameco Crow Butte Operation Dawes, Nebraska 1,000,000 Operating Operating Operating Operating Hydro Resources, Inc. Church Rock McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Hydro Resources, Inc. Crownpoint McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Lost Creek ISR, LLC, a subsidiary of Ur- Energy USA Inc. Lost Creek Project Sweetwater, Wyoming 2,000,000 Under Construction Under Construction

380

Lessons Learned Quarterly Report, June 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Lessons Learned Quarterly Report, June 2009 Welcome to the 59th quarterly report on lessons learned in the NEPA process. We are pleased to feature the DOE NCO meeting and the NAEP annual conference, where streamlining the NEPA process for Recovery Act projects and consideration of climate change in NEPA documents were both addressed. We've begun to follow up on suggestions from the NCO meeting (below). Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NEPA Compliance Officers Share Strategies 2009 NCO Meeting: Expediting a Quality NEPA Process Expedite Schedule and Maintain Quality Preparing Focused, Concise EAs

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lessons Learned Quarterly Report, September 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Lessons Learned Quarterly Report, September 2003 Welcome to the 36th quarterly report on lessons learned in the NEPA process. We are pleased to feature the July 2003 NEPA Community Meeting in this issue. Also, please note that the cumulative index, a useful reference tool, is printed in this issue. Thank you for your continuing support of the Lessons Learned program. Included in this issue: DOE NEPA Community Gauges Progress In Its Continuing Pursuit of Excellence Floodplain and Wetland Regulations Effective September 26, 2003 NEPA Community Meeting Highlights Metrics Show Progress In Meeting Goals Getting from Here to There Lessons Learned Along the Way e-Government Approaches to EIS Distribution Procedures Evolving for Sensitive Information

382

Lessons Learned Quarterly Report, June 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 1997 Lessons Learned Quarterly Report, June 1997 Lessons Learned Quarterly Report, June 1997 Welcome again to the Quarterly Report on Lessons Learned in the NEPA process. This report includes: DOE-wide NEPA Contracts Will Be Ready to Use Soon! CEQ Initiative on NEPA Implementation DOE Submits Comments on CEQ Environmental Justice Guidance NEPA Order to Be Reissued with Conforming Changes DOE Sued on Stockpile Stewardship and Waste Management PEISs Effective NEPA Hearings Bob Strickler and Linda Thurston Retire Reminder about Stakeholder Notification Litigation Updates New Executive Order on Protecting Children from Environmental Risks Annual NEPA Planning Summaries What's New with Electronic NEPA Questionnaire Results Other Completed EIS-Related Documents

383

Lessons Learned Quarterly Report, September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Lessons Learned Quarterly Report, September 2009 Welcome to the 60th quarterly report on lessons learned in the NEPA process. We are pleased to feature the extraordinary support provided by our NCO volunteers and to introduce Scott Blake Harris, DOE General Counsel, and his plans for improving the DOE NEPA process. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE NCO Volunteers Lend a Hand To Expedite Recovery Act Projects DOE General Counsel Scott Blake Harris Aims To Improve the NEPA Review Process CEQ Report to Congress on Recovery Act DOE Grants NEPA Variances for Two Solicitations Introducing DOE's New General Counsel

384

Lessons Learned Quarterly Report, March 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Lessons Learned Quarterly Report, March 2010 Welcome to the 62nd quarterly report on lessons learned in the NEPA process. In this issue, we start a year-long observance of the 40th anniversary of the National Environmental Policy Act. The occasion calls for celebration of NEPA's successes as well as reflection on opportunities for improvement. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: CEQ Celebrates NEPA at 40. . . and So Do We! DOE Launches Categorical Exclusion Database Celebrating 40 Years with NEPA CEQ Issues Draft NEPA Guidance CEQ NEPA Symposium Presidential Proclamation Reflections: Professor Mandelker

385

Lessons Learned Quarterly Report, September 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 Lessons Learned Quarterly Report, September 2012 This issue features suggestions from experienced NEPA practitioners on ways to meet Secretary Chu's challenge to make better use of existing tools and integrate project management with NEPA compliance. Articles in this issue include: Secretary's Memorandum Key Principles OLC Training Suggestions from NETL Effective EIS Management Teams EPA Requires Electronic EIS Filing 2012 DOE NEPA Stakeholders Directory DOE-wide NEPA Contracts Update GIS Tools for the NEPA Practitioner CEQ Cooperating Agency Report NEPA Office Summer Interns Transitions Appeals Court Upholds BELLA EA Using Social Media for NEPA NNSA Webcast SPD SEIS Hearing EAs and EISs Completed This Quarter Questionnaire Results

386

Lessons Learned Quarterly Report, March 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Included in this issue: New, Improved "Green Book" Is on the Way Modern Pit Facility Final EIS Delayed NNSA Withdraws FONSI for LANL Biosafety Lab BLM Programmatic EIS On Wind Energy Lesson Learned about Schedule and Teamwork CEQ Chair Emphasizes NEPA's "Productive Harmony" Goal Supporting Flexible Decisionmaking in Practice NEPA Champions Brief Congressional Staff

387

Lessons Learned Quarterly Report, March 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Lessons Learned Quarterly Report, March 2003 Welcome to the 34th quarterly report on lessons learned in the NEPA process. We are pleased to feature the synergy between NEPA and the new DOE Order 450.1, Environmental Protection Program. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: New DOE Order Focuses on EMS, Supports Basic NEPA Principles Few Comments Received on Proposed Floodplain/Wetlands Rule Changes China's Environmental Impact Assessment Law DOI/Forest Service Proposed Categorical Exclusions Potential Resources for NEPA Practitioners A View from the Trenches Fossil Energy Launches EIS Process Improvement Team CEQ Updates EIS Distribution Saves Yucca Mountain Project $200,000

388

Lessons Learned Quarterly Report, March 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2001 Lessons Learned Quarterly Report, March 2001 Lessons Learned Quarterly Report, March 2001 Welcome to the 26th quarterly report on lessons learned in the NEPA process. Articles included in this issue: Innovative Field Research Benefits from NEPA Review Mini-guidance: $aving $ on EIS Distribution NEPA Office Needs Fewer Paper Copies of Issued Documents Analyzing All Reasonable Alternatives in an EIS NOAA Issues New Coastal Zone Regulations DOE Solicits Comments on Public Participation Policy More NNSA NEPA Procedures BLM Tool for Better Scoping Comments NEPA Staff Supported CEQ Technology Task Force Transitions When to Provide Cost Estimates in Annual NEPA Planning Summaries Some Considerations in Selecting NEPA Document Preparers DOE-Wide NEPA Contracts Update

389

Wind Program R&D Newsletter: Fourth Quarter 2013  

Energy.gov (U.S. Department of Energy (DOE))

This archived U.S. Department of Energy Wind Program R&D Newsletter provides information about the program's research and development projects, its accomplishments, and funding opportunities from the fourth quarter of 2013.

390

2007-2009 Power Rates Quarterly Updates (pbl/rates)  

NLE Websites -- All DOE Office Websites (Extended Search)

(PFR) Firstgov FY 2007 2009 Power Rates Quarterly Updates In BPAs 2007-2009 Wholesale Power Rate Case (WP-07), BPA agreed that it would post reports about BPAs power...

391

Interventions into old residential quarters : the case of Shahjahanabad  

E-Print Network (OSTI)

The thesis develops design guidelines for interventions into residential quarters of the old core cities in the Third World. Their purpose is to provide a suitable framework for developing residential designs maintaining ...

Badshah, Akhtar

1983-01-01T23:59:59.000Z

392

Program Update: 4th Quarter 2013 | Department of Energy  

Office of Environmental Management (EM)

Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS;...

393

Agricultural Business Curriculum (BS) (effective Spring Quarter 2011)  

E-Print Network (OSTI)

Agricultural Business Curriculum (BS) (effective Spring Quarter 2011) Freshman year Animal Science....................................3 Natural Sciences (GER) Biological Sciences 130, 131..............................4 English (GER Mathematics (GER).............................................6 Plant Science 101

Selmic, Sandra

394

Animal Science Curriculum (BS) (effective Spring Quarter 2011)  

E-Print Network (OSTI)

Animal Science Curriculum (BS) (effective Spring Quarter 2011) Freshman Year Animal Science 111 Sciences (GER) Biological Sciences 130, 131, 132, 133.....................8 Plant Science 101......................................................3 Social/Behavioral Sciences (GER)............................3 32 Sophomore Year Agricultural Business 220

Selmic, Sandra

395

Natural gas: Imports and exports third quarter report 1993  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies with authorizations to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the third quarter of 1993 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months (October 1992--September 1993). Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

Not Available

1993-12-31T23:59:59.000Z

396

Natural gas imports and exports: Third quarter report, 1998  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the third quarter of 1998 (July--September). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent calendar quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

397

OE Releases Third Issue of Energy Emergency Preparedness Quarterly...  

Office of Environmental Management (EM)

Preparedness Quarterly (July 2012) July 13, 2012 - 12:45pm Addthis The Office of Electricity Delivery and Energy Reliability (OE) has released the third issue of the Energy...

398

Natural gas imports and exports. Second quarter report, 1998  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepared quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1998 (April through June). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-11-01T23:59:59.000Z

399

Natural gas imports and exports. Fourth quarter report, 1998  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-12-31T23:59:59.000Z

400

Natural gas imports and exports. First quarter report, 1998  

SciTech Connect

The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the first quarter of 1998 (January through March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

NONE

1998-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

U.S. Energy Information Administration | Quarterly Coal Report...  

U.S. Energy Information Administration (EIA) Indexed Site

1. U.S. Coal Summary Statistics, 2008 - 2014 (thousand short tons) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2014 Table ES-1. U.S. Coal Summary...

402

Lessons Learned Quarterly Report, June 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Lessons Learned Quarterly Report, June 2003 Welcome to the 35th quarterly report on lessons learned in the NEPA process. We are pleased to include in this issue three new mini-guidance articles. Thank you for your continuing support of the Lessons Learned program. Articles included in this issue: Responding to Comments Is Work, But It Makes the NEPA Process Work DOE NEPA Meeting in July Mini-guidance: Multiple RODs Offer Flexibility Effective and Efficient EIS Distribution Keep the Public Informed When EIS Plans Change DOE Updates Public Participation Policy Observations on Annual NEPA Planning Summaries DOE-Wide NEPA Contracts Guidance Issued Not Meeting CAA Requirements Can Cause Delays Floodplain and Wetland Regulations Update

403

Lessons Learned Quarterly Report, September 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Lessons Learned Quarterly Report, September 2001 Welcome to the 28th quarterly report on lessons learned in the NEPA process. This completes our seventh year of providing performance metrics, news, and guidance to the DOE NEPA Community. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Compliance Officers Consider Further Improvements NCO Meeting Federal/State/Tribal Coordination Forest Fire; Forest Preserved View From EPA Streamlining Approvals of Energy Projects NEPA Pilot Projects to Demonstrate Mediation DOE-wide NEPA Contracting Executive Order on Migratory Birds FERC Outreach for Natural Gas Approvals Life-Cycle Assessment for "Green" Projects

404

Lessons Learned Quarterly Report, June 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1996 1996 Lessons Learned Quarterly Report, June 1996 Welcome again to the Quarterly Report of Lessons Learned in the NEPA process. This Quarterly Report includes: March 1996 NEPA Contracting Workshop: Do it Right the First Time EIS Coordination between Headquarters and Field Bounding Analysis in DOE NEPA Documents Questions and Answers on EIS References Suggestions from a NEPA Document Manager (Hanford K-Basins Spent Fuel EIS) Toll-Free Phone for Public Involvement Video Conferencing for Public Hearings Alternative Dispute Resolution and the NEPA Process Litigation Updates Comments on Proposed Amendments to DOE NEPA Regulations Second quarter FY 1996 Lessons Learned Questionnaire results,including EIS and EA cost and time reports Analysis of recent trends in costs and time

405

General Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit Hours ENGN 110 2 ECE 111 2  

E-Print Network (OSTI)

: 128 ** Meets philosophy and ethics general education requirement. Electrical engineering majors mustGeneral Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit (C or better required) 3 PHYS 231N 4 COMM 101R 3 General Education and Major Coursework: Credit Hours

406

55th Lessons Learned Quarterly Report, June 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 1 08 1 Second Quarter FY 2008 June 2, 2008; Issue No. 55 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A September Meeting: Making NEPA Work for DOE Old NEPA Tools Still Work in a "Changing Climate" With the support of David Hill, DOE General Counsel, planning for the next DOE NEPA Community meeting is underway!

407

Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. First quarter 1995  

SciTech Connect

During first quarter 1995, samples from AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility (Met Lab HWMF) were analyzed for selected heavy metals, field measurements, radionuclides, volatile organic compounds, and other constituents. Six parameters exceeded standards during the quarter. As in previous quarters, tetrachloroethylene and trichloroethylene exceeded final Primary Drinking Water Standards (PDWS). Total organic halogens exceeded its Savannah River Site (SRS) Flag 2 criterion during first quarter 1995 as in fourth quarter 1994. Aluminum, iron, and manganese, which were not analyzed for during fourth quarter 1994, exceeded the Flag 2 criteria in at least two wells each during first quarter 1995. Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting the determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Unit were also similar to previous quarters.

NONE

1995-06-01T23:59:59.000Z

408

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

409

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

410

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Over a Billion Supercomputing Hours to Address Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life sciences, and materials science.

411

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Over a Billion Supercomputing Hours to Address DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life

412

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

413

DOE's Office of Science Awards 18 Million Hours of Supercomputing...  

Office of Environmental Management (EM)

Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific...

414

SunShot Announces 24-Hour Solar Data Hackathon  

Energy.gov (U.S. Department of Energy (DOE))

SunShot will host a 24-hour solar data hackathon at the 2014 SunShot Grand Challenge Summit. Learn more over at the EERE blogand register here.

415

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

This Order establishes requirements and responsibilities for the management of pay, including overtime and compensatory time, leave administration, and hours of duty. Cancels DOE O 322.1A. Canceled by DOE O 322.1C.

2005-01-14T23:59:59.000Z

416

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1

2011-01-19T23:59:59.000Z

417

Liquid fossil fuel technology. Quarterly technical progress report, January-March 1980  

SciTech Connect

Highlights of the BETC January-March 1980 quarter were: Gasohol was tested in a cooperative effort with Southwestern Bell Telephone Co. Two fleets of 55 cars were tested using gasohol in one and gasoline in the other. No problems were encountered. The gasohol-fueled cars had less emissions, and the fuel efficiencies for both fleets were approximately the same. An in situ combustion has been successfully started in a heavy oil deposit in Kansas. After some difficulties in starting the burn, it is now operating satisfactorily and producing oil. Cooperation between DOE and the Venezuelan oil industry was explored in a meeting at BETC that emphasized efforts to produce heavy oil. Cooperation through the International Energy Agency is expected to result in sharing of technology on enhanced oil recovery. Petroleum product surveys are produced cooperatively by DOE and the American Petroleum Institute. They give the properties of the products currently being marketed in the US. During the quarter, surveys on Motor Gasolines, Summer 1979 and Diesel Fuel Oils, 1979 were published. They are used to trace changes in characteristics and also to set specifications. The size of colloids, micelles, and emulsions in petroleum and associated liquids can be a factor in the design of improved recovery processes. The use of small angle x-ray scattering has been facilitated by a new method of calculation. The development of the Liquid Fossil Fuel Cycle has been facilitated by a workshop and further discussions resulting in a new statement Planning Framework for Liquid Fossil Fuel Cycle, March 1, 1980. This has now been used to prepare a computer-processible form to use in a critical path study of the BETC program.

Linville, B. (ed.)

1980-08-01T23:59:59.000Z

418

Commercial and Residential Hourly Load Profiles for all TMY3...  

Open Energy Info (EERE)

America House Simulation Protocols). This dataset also uses the Residential Energy Consumption Survey (RECS) for statistical references of building types by location (Additional...

419

OE Releases Second Issue of Energy Emergency Preparedness Quarterly (April 2012)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has released the second issue of the Energy Emergency Preparedness Quarterly (EEPQ), designed to briefly highlight a few of the energy preparedness activities that occur each quarter.

420

Yucca Mountain Site Characterization Project technical data catalog quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1995-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement  

SciTech Connect

The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

NONE

1994-12-31T23:59:59.000Z

422

Natural gas imports and exports. First quarter report 1994  

SciTech Connect

The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).

Not Available

1994-08-01T23:59:59.000Z

423

Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement  

SciTech Connect

The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

NONE

1994-03-31T23:59:59.000Z

424

Hourly Energy Emission Factors for Electricity Generation in the United  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United Hourly Energy Emission Factors for Electricity Generation in the United States Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. This project utilized GridViewTM, an electric grid dispatch software package, to estimate hourly emission factors for all of the eGRID subregions in the continental United States. These factors took into account electricity imports and exports

425

INCITE Program Doles Out Hours on Supercomputers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers November 5, 2012 - 1:30pm Addthis Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science

426

Lessons Learned Quarterly Report, December 1997 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1997 1997 Lessons Learned Quarterly Report, December 1997 Welcome to the fourth quarter FY 1997 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: NEPA Review Adds Value to Proposed Sale of Naval Petroleum Reserve INEEL EIS: New Approaches to Scoping CEQ Environmental Justice Guidance Strategies for EIS Savings ISO 14000 and NEPA Recent EIS Milestones NAEP NEPA Recommendations New National Environmental Training Office Beneficial Landscaping Practices Draft CEQ Guidance on Global Climate Change Transitions DOE-wide NEPA Contracts Update Transboundary Environmental Impacts Annual NEPA Planning Summaries Recent NEPA Guidance Public Involvement: If You Don't Know Where You're Going Litigation Updates Questionnaire Results EIS-related Documents

427

NEPA Lessons Learned Quarterly Report Questionnaire | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire This questionnaire is used to collect information from the Department of Energy (DOE) National Environmental Policy Act (NEPA) Community. In accordance with DOE Order 451.1B, NEPA Compliance Program, NEPA Document Managers and NEPA Compliance Officers should fill out a questionnaire (separately or jointly) as soon as possible after completing each environmental impact statement (EIS) and environmental assessment (EA). Questionaires also may be returned earlier, at any time during the NEPA process, to share valuable lessons learned with others. Other document preparation team members also are encouraged to submit a questionnaire. Information provided through this questionaire helps the Office of NEPA

428

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 News Updates Dominion Resources, Inc. has informed the NRC that Dominion Virginia Power will amend its COL application (COLA) to reflect the ESBWR technology by the end of 2013. In 2009 Dominion dropped the ESBWR from its COLA after failing to reach a commercial agreement with General Electric-Hitachi (GEH). A COL is expected no earlier than late 2015. Dominion Virginia Power has not yet committed to building a new nuclear unit at North Anna. NRC has determined that the latest revision to the South Texas Project COLA does not alleviate foreign interest concerns; the staff found that despite having only a 10% ownership stake in Nuclear Innovation North America LLC (NINA), Toshiba American Nuclear Energy Corporation's

429

Financial News for Major Energy Producers, Third Quarter 2010  

Gasoline and Diesel Fuel Update (EIA)

Producers, Third Quarter 2010 Producers, Third Quarter 2010 Release Date: January 5, 2011 Next Release Date: To Be Determined Report Sections: Corporate and Petroleum Net Income Worldwide Oil and Gas Production Operations Worldwide Refining/Marketing Operations Worldwide Petroleum Capital Expenditures Worldwide Downstream Natural Gas and Power, and Chemicals Operations Supplemental Figures Supplemental Tables Download this Report: Full Report in PDF-Format Past Issues in PDF-Format Additional Information FRS Home Financial Terms Glossary Contacts Notes: The "Financial News for Major Energy Producers" is issued quarterly to report recent trends in the financial performance of the major energy producers. "Major energy producers" are respondents to Form EIA-28 (Financial Reporting System). All U.S.-based respondent companies that

430

Lessons Learned Quarterly Report, December 1998 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1998 December 1998 Lessons Learned Quarterly Report, December 1998 Welcome to the fourth quarter FY 1998 Quarterly Report on lessons learned in the NEPA process. Articles in this issue include: New and Improved NEPA Compliance Guide Issued in 2 Volumes NEPA Community Meeting in Las Vegas Managing Baseline Environmental Information for the Sandia Site-wide EIS Water Project Mini-guidance Regulatory Compliance and NEPA Procedures for an Environmental Critique and Synopsis, and a Supplement Analysis EPA Broadens Voluntary EIS Policy Historic Preservation Proposed Regulatory Revision Withdrawn Acting Chair at CEQ Training Opportunities Environmental Lessons Learned Seminars Litigation Updates DOE NEPA Community Members in Transition Annual NEPA Planning Summaries Performance-based Statements of Work

431

Lessons Learned Quarterly Report, June 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 Lessons Learned Quarterly Report, June 2002 Welcome to the 31st quarterly report on lessons learned in the NEPA process. We thank you for your continuing support of the Lessons Learned program. Articles in this issue include: Beverly Cook Balances NEPA Objectives: Both Flexibility and Consistency Are Needed DOE NEPA Community Meeting in July Expanding Online Access to DOE NEPA Documents Change in e-file Submittal Address Perspectives from a Town Official EH Priority: Guidance to Improve NEPA Implementation EPA Distributes Reminders on Filing an EIS Interior Department Welcomes Electronic EISs New on the NEPA Bookshelf Transitions Whats New from CEQ Training Opportunities Litigation Updates Proposals Due for New DOE-wide Contracts EAs and EISs Completed This Quarter

432

Lessons Learned Quarterly Report, June 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2001 Welcome to the 27th quarterly report on lessons learned in the NEPA process. Articles included in this issue: DOE Issues Supplement to Yucca Mountain Draft EIS Los Alamos Project Guided by MAP BPAs Readers Guide Cultural, Tribal, and Historic Updates Secretarial Policy on Cultural Resources Working with Indian Tribal Nations Historic Preservation Final Regulations Can Pilot Projects, Dispute Resolution Techniques Improve NEPA Implementation? DOE-wide NEPA Contracts Update Mini-guidance: DOE Public Reading Rooms Drafting Federal Register Notices Potential NEPA Implications of a National Energy Policy Nominee for CEQ Transitions Training Opportunities EAs and EISs Completed This Quarter Recent EIS Milestones Cost and Time Facts

433

Program Update: 3rd Quarter 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Program Update: 3rd Quarter 2010 Inside this Update: Public Access Established for the Dr. Modesto Iriarte Technological Museum in Rincόn, Puerto Rico; Draft LM Strategic Plan Available for Review; Legacy Management Business Center Awarded Second Energy-Efficiency Award; LM Assumes Responsibility for Yucca Mountain Records and Information; Natural Gas Sampling at the Gasbuggy, New Mexico; Rio Blanco and Rulison, Colorado; Nuclear Gas Sites; Students from Native American Environmental Youth Camp Tour Tuba City, Arizona, Site; 2010 Long-Term Surveillance and Maintenance Conference, and more. Office of Legacy Management (LM) Program Update, July-September 2010 More Documents & Publications Program Update: 3rd Quarter 2011 Program Update: 3rd Quarter 2013

434

Quarterly Nuclear Deployment Scorecard - July 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 News Updates The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months. The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to respond to outstanding technical issues and provide additional information related to post-Fukushima requirements. DOE released a funding opportunity announcement on March, 22 2012 to

435

Program Update: 4th Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Program Update: 4th Quarter 2013 Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated at the Mound, Ohio, Site; Visitors Learn About the History of LM's Unique Facility in Puerto Rico; German Remediation Offi cials Benchmarking Visit; International Atomic Energy Agency Accepts Consultation from LM; Environmental Justice Activities; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time Office of Legacy Management (LM) Program Update, October-December 2013 More Documents & Publications

436

Lessons Learned Quarterly Report, December 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2013 December 2013 Lessons Learned Quarterly Report, December 2013 Welcome to the 77th quarterly report on lessons learned in the NEPA process. This issue reminds us that, through teamwork and dedication by DOE's NEPA community, we can produce high quality documents that enhance the Department's decisionmaking and help protect the environment. Articles in this issue include: Was Your NEPA Process Just One More Hurdle, or Did It Make a Difference? Bonneville Participates in Regional Infrastructure Team EPA EIS Mapper Tool Online Tribal Training Key Reference Document on Climate Change Golden Field Office Relocates Golden FONSI Template EPA Ratings of DOE Draft EISs New Migratory Bird MOU Jim Daniel To Retire Transitions EAs and EISs Completed This Quarter Cost and Time Facts

437

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In

438

Lessons Learned Quarterly Report Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 1995 March 1, 1995 Lessons Learned Quarterly Report, March 1995 This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised questionnaire that was provided for use during Janua~ 1995, and includes information on direct and indirect NEPA process costs and on total project costs. Additionally, the report includes a feature story on lessons learned during preparation of the F-Canyon Plutonium Solutions Environmental Impact Statement. December 1, 1994 Lessons Learned Quarterly Report, December 1994 On August 12, 1994 the Office of NEPA Oversight distributed an interim/draft lessons learned questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments

439

Lessons Learned Quarterly Report, December 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, December 2004 Lessons Learned Quarterly Report, December 2004 Lessons Learned Quarterly Report, December 2004 The National Environmental Policy Act turns 35 on January 1, 2005! This landmark legislation altered the Federal decisionmaking process. In this issue of LLQR, Ray Berube, retired Deputy Assistant Secretary for Environment, looks back at how NEPA compliance procedures have evolved at DOE. Our lead article looks at how the Internet is becoming an increasingly useful NEPA tool. We hope you will find helpful suggestions throughout LLQR on how we can continue to improve and modernize NEPA implementation, and, as always, we welcome your suggestions for continuous improvement. Articles included in this issue: Putting the Web to Work for NEPA Case Studies Address NEPA Section 101

440

Lessons Learned Quarterly Report, March 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Lessons Learned Quarterly Report, March 2009 Welcome to the 58th quarterly report on lessons learned in the NEPA process. We have been very busy addressing our NEPA responsibilities arising from the recovery act as well as the new policies of the obama administration. In this issue of the Lessons Learned Quarterly Report (LLQR), we share ideas and experiences that will foster an improved and expedited NEPA compliance process. Articles included in this issue: NEPA Efficiency Essential to Recovery Plan NEPA Opportunities in a New Era of Openness Secretary Chu to DOE Employees: "Help Turn the Ship" Secretary Chu Pledges to Improve DOE Management New DOE-Wide NEPA Support Contracts! Sutley Brings Breadth of Government Experience to CEQ DOE Advances NEPA Process for Loan Guarantees

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Lessons Learned Quarterly Report, September 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Lessons Learned Quarterly Report, September 2002 Welcome to the 32nd quarterly report on lessons learned in the NEPA process. Much of this issue is devoted to reporting on the July DOE NEPA Community Meeting. Also featured is new NEPA-related guidance. We thank you for your continuing support of the Lessons Learned program. Articles included in this issue: NEPA Community Meeting Addresses Reform Initiatives New Guidance Issued, More Underway Accident Analysis Guidance Agencies Discuss Indian Sacred Sites e-NEPA: Security Certification Needed Draft Information Quality Guidelines Litigation Updates DOE-wide NEPA Contracts Update Training Opportunities EAs and EISs Completed This Quarter NEPA Document Cost and Time Facts Recent EIS-Related Milestones What Worked and Didn't Work

442

Lessons Learned Quarterly Report, March 1996 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1996 1996 Lessons Learned Quarterly Report, March 1996 Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPArelated information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: A NEPA SUCCESS STORY: Environmental Impact Statement for the Safe Interim Storage of Hanford Tank Wastes NEPA lessons learned at the Hanford Site Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers Updates on the proposed amendments to DOE's NEPA regulations,

443

The Savannah River Site's Groundwater Monitoring Program, second quarter 1990  

SciTech Connect

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

Not Available

1991-02-07T23:59:59.000Z

444

The Savannah River Site's Groundwater Monitoring Program, second quarter 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

445

Mixed Waste Management Facility groundwater monitoring report, First quarter 1994  

SciTech Connect

During first quarter 1994, nine constituents exceeded final Primary Drinking Water Standards in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility, the Old Burial Ground, the E-Area Vaults, the proposed Hazardous Waste/Mixed Waste Disposal Vaults, and the F-Area Sewage Sludge Application Site. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. Chloroethene (vinyl chloride), copper, 1,1-dichloroethylene, lead, mercury, nonvolatile beta, or tetrachloroethylene also exceeded standards in one or more wells. Elevated constituents were found in numerous Aquifer Zone IIB{sub 2} (Water Table) and Aquifer Zone IIB{sub 1}, (Barnwell/McBean) wells and in one Aquifer Unit IIA (Congaree) well. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Not Available

1994-06-01T23:59:59.000Z

446

Energy programs. Quarterly report, January-March 1980  

SciTech Connect

The Johns Hopkins University Applied Physics Laboratory, is engaged in developing energy resource, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the US Naval Air Station, Norfolk, Va.

Not Available

1980-01-01T23:59:59.000Z

447

Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deployment Summary, January 2013 Deployment Summary, January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

448

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" 4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" "In-Situ-Leach Plant Owner","In-Situ-Leach Plant Name","County, State (existing and planned locations)","Production Capacity (pounds U3O8 per year)","Operating Status at End of" ,,,,2012,"1st Quarter 2013","2nd Quarter 2013","3rd Quarter 2013" "Cameco","Crow Butte Operation","Dawes, Nebraska",1000000,"Operating","Operating","Operating","Operating" "Hydro Resources, Inc.","Church Rock","McKinley, New Mexico",1000000,"Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed"

449

Lessons Learned Quarterly Report, June 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Lessons Learned Quarterly Report, June 2011 Welcome to the 67th quarterly report on lessons learned in the NEPA process. This issue showcases BPA's mitigation and monitoring activities and best practices of DOE Program and Field Offices for efficiently preparing NEPA documents, involving the public, and making a difference in the quality of environmental protection. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: Bonneville's "Balanced Scorecard" Approach to Mitigation, Monitoring, and Adaptive Management Make Reference Documents Available Online Promoting NEPA Transparency and Public Engagement "Sunshine Week" Symposium DOE Evaluating NEPA Compliance in Audits

450

Lessons Learned Quarterly Report, December 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Lessons Learned Quarterly Report, December 2009 Welcome to the 61st quarterly report on lessons learned in the NEPA process. In this issue, we highlight many of the ways that the NEPA process furthers transparency in government decisionmaking. Thank you for your continuing support of the Lessons Learned program. As always, we welcome your suggestions for improvement. Articles included in this issue: DOE Begins Online Posting of Categorical Exclusion Determinations CEQ Reports Timely NEPA Reviews for Recovery Act Comprehensive Draft EIS for Hanford Issued Y-12 Public Hearings Show Different Perspectives Revised Background Radiation Exposure Estimates Electronic CX Determination Form New Executive Order on Greenhouse Gases, Sustainability BPA Environmental Leadership Award

451

Microsoft Word - Defense Science Quarterly Nov 2007 final.doc  

National Nuclear Security Administration (NNSA)

November 2007 November 2007 Dr. Brad Wallin Dr. Robert Hanrahan Defense Science Quarterly Inside This Issue 1 Message from the Director 2 Contributions of the Los Alamos Proton Radiography Program to the Nuclear Weapons Program 4 Contributions of the Los Alamos Weapons Neutron Research Facility Programs to the Nuclear Weapons Program 5 Cross-cutting Science: Materials in Extreme Environments 7 Academic Outreach: The Stewardship Science Academic Alliances Program 10 Z Refurbishment Project Wraps Up 11 Publication Highlights Chris Deeney, Director, Office of Defense Science Thank you for another exciting quarter in the Science Campaign. We recently visited Los Alamos and Sandia National Laboratories to conduct a technical review, and

452

Lessons Learned Quarterly Report, December 2000 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Lessons Learned Quarterly Report, December 2000 Welcome to the 25th quarterly report on lessons learned in the NEPA process. Included in this issue: CEQ Fosters Communication Among Federal NEPA Liaisons DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined Focus on CEQ NEPA Liaison Topics Get to Know Your EPA EIS Reviewers List Cooperating Agencies on EIS Cover Sheets Amphibian Declines Federal Agencies Adopt Unified Watershed Management Policy Revised Historic Preservation Regulations To Be Issued Accurate Electronic NEPA Files Mini-guidance: Reduce Abbreviations Mini-guidance Collection Available Use the Glossary of Terms NAEP Award Nominations Due NEPA Contracts: Measuring Performance Quality DOE-Wide NEPA Contracts Update

453

Navy Estimated Average Hourly Load Profile by Month (in MW)  

NLE Websites -- All DOE Office Websites (Extended Search)

Navy Estimated Average Hourly Load Profile by Month (in MW) MONTH HE1 HE2 HE3 HE4 HE5 HE6 HE7 HE8 HE9 HE10 HE11 HE12 HE13 HE14 HE15 HE16 HE17 HE18 HE19 HE20 HE21 HE22 HE23 HE24...

454

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY  

E-Print Network (OSTI)

BIOLOGY 650 (credit 2 hours) Animal Physiology LABORATORY Spring 2011 Instructor: ROBIN COOPER , Ph role of ion channels and transporters in regulation of the membrane potential will be covered in great-neuron communication through electrical and chemical synapses will be examined in live preparations. The historical

Cooper, Robin L.

455

Aegis Combat and Weapon Systems Overview 24 hours, $1495  

E-Print Network (OSTI)

Aegis Combat and Weapon Systems Overview 24 hours, $1495 Launched from the Advanced Surface Missile that led to the initiation of Aegis. Topics Include: · AegisOverviewandHistory · AegisBMD · AegisWeaponSEprocessensuresthatsystemsaredevelopedtomeet affordable, operationally effective, and timely mission objectives. FocusonengineeringtheWeapon

Fork, Richard

456

BRASENOSE COLLEGE 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY  

E-Print Network (OSTI)

BRASENOSE COLLEGE OXFORD 8-HOUR STIPENDIARY LECTURERSHIP IN PHILOSOPHY FURTHER PARTICULARS in Philosophy at Brasenose College, Oxford. The post is tenable from 1 October 2013 (finishing date: 31st information about the College can be found at www.bnc.ox.ac.uk. Brasenose has a strong tradition in Philosophy

Oxford, University of

457

Folding Proteins at 500 ns/hour with Work Queue  

E-Print Network (OSTI)

in part to the unbiased nature of these simulations: the low-energy regions of the free-energy landscape to achieve an aggregate sampling rate of over 500 ns/hour. As a comparison, a single process typically are oversampled while the (arguably more interesting) high-energy tran- sition regions are rarely observed

Thain, Douglas

458

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network (OSTI)

Center Pool Course Description: Intermediate stroke and swimming skills Prerequisites: Must have by swimming laps during open swim/lap swim at MSU pool. Lap swim times are available online or at the frontCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

459

Credit Based; Intermediate Swimming Credit/Hours Class  

E-Print Network (OSTI)

at the meet. 3) Swim laps during open swim/lap swim at MSU pool. A sheet will be posted on D2l that you. Emergency phone B. Pool Rules C key swimming skills 1. Breathing 2. Floating/body position 3. Treading waterCredit Based; Intermediate Swimming Credit/Hours Class Title Lead Instructor Phone Email Office

Maxwell, Bruce D.

460

Pay and Leave Administration and Hours of Duty  

Directives, Delegations, and Requirements

The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1. Admin Chg 1, dated 5-10-12, cancels DOE O 322.1C.

2011-01-19T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Agency costs and efficiency of business capital investment: evidence from quarterly capital expenditures  

Science Journals Connector (OSTI)

Using the quarterly Compustat files, we present empirical findings that business capital investment is significantly higher in the fourth quarter than in other quarters. Even after controlling for business capital investment determinants, we find that the fourth quarter capital investment is significantly larger but less sensitive to investment opportunities than other quarters' capital investment. This phenomenon is more evident for firms with larger cash holdings than for firms with smaller cash holdings, for larger firms than for smaller firms, and for diversified firms than for stand-alone firms. Our findings suggest a high level of agency costs in corporate investment decisions.

Hyun-Han Shin; Yong H. Kim

2002-01-01T23:59:59.000Z

462

Improving radiation survey data using CADD/CAE  

SciTech Connect

A new application of computer-aided design and drafting (CADD) and computer-aided engineering (CAE) at the Three Mile Island Unit 2 (TMI-2) cleanup is improving the quality of radiation survey data taken in the plant. The use of CADD/CAE-generated survey maps has increased both the accuracy of survey data and the capability to perform analyses with these data. In addition, health physics technician man hours and radiation exposure can be reduced in situations where the CADD/CAE-generated drawings are used for survey mapping.

Palau, G.L.; Tarpinian, J.E.

1987-01-01T23:59:59.000Z

463

QUARTER SH OR T-T ER M EN ER GY OU TL OO K QUAR TERL Y PROJ  

Gasoline and Diesel Fuel Update (EIA)

1 1 2 QUARTER SH OR T-T ER M EN ER GY OU TL OO K QUAR TERL Y PROJ ECTIO NS ENERGY INFORMA TION ADMINIST RATION May 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or telecommunications device for the hearing impaired. Addresses, telephone numbers, and hours are as follows: National Energy Information Center, El-231 Energy Information Administration Forrestal Building, Room 1F-048 Washington, DC 20585 (202) 586-8800 Telecommunications Device for the

464

Name: Intended quarter of entry: Academic Planning Worksheet for Philosophy  

E-Print Network (OSTI)

Name: Intended quarter of entry: Academic Planning Worksheet for Philosophy This worksheet-Year College Courses: Introductory courses in symbolic logic, social philosophy, major problems of philosophy, and history of philosophy. Courses to develop writing skills, as well as language courses, especially Greek

Queitsch, Christine

465

NEAMS Quarterly Report for July-September 2013  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) quarterly report includes highlights, fuel and reactor product line accomplishments, recent and upcoming milestones, BISON 1.0 release, MARMOT and SHARP news, fuel benchmarks, MeshKit 1.0 release, and information on neutronics and thermal hydraulics teams accomplishments.

466

High Flux Isotope Reactor quarterly report, January-March 1986  

SciTech Connect

Four routine cycles of operation were completed during the first quarter. Four scheduled end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 86.9%. An unscheduled control plate and control cylinder replacement was performed after tantalum contamination in the primary coolant system was traced to the inner cylinder.

Corbett, B.L.; Farrar, M.B.

1986-06-01T23:59:59.000Z

467

Natural gas imports and exports; Fourth quarterly report, 1993  

SciTech Connect

The Office of Fuels Programs prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the fourth quarter of 1993 (October--December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the 5 most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During 1993, data indicates gas imports grew by about 10 percent over the 1992 level (2328 vs. 2122 Bcf), with Canadian and Algerian imports increasing by 8 and 82 percent, respectively. During the same time period, exports declined by 41 percent (144 vs. 243 Bcf). Exports to Canada decreased 47 percent from the 1992 level (50 vs. 95 Bcf) and exports to Mexico decreased by 60 percent (38 vs. 95 Bcf).

NONE

1993-12-31T23:59:59.000Z

468

2005 Summer/Fall Quarters Page The Critical Path  

E-Print Network (OSTI)

in the latest series of the last two satellites to be provided to NOAA in support of the polar weather satellite2005 Summer/Fall Quarters Page The Critical Path NOAA-18 (N) - In Flight The NOAA-N satellite), California. This was the first launch of a POES satellite on a Delta vehicle and NOAA-N was the first launch

Christian, Eric

469

Medical and Health Divisions quarterly report, July, August, September, 1948  

SciTech Connect

This quarterly report describes progress in four programs entitled (1) The Metabolic Properties of Plutonium and Allied Materials, (2) Biological Studies of Radiation Effects, (3) Biological Effects of Radiation from External and Internal Sources and (4) Health Chemistry and Physics. Progress in each program is separately indexed and abstracted for the database.

NONE

1995-11-01T23:59:59.000Z

470

Coal liquefaction. Quarterly report, July-September 1979  

SciTech Connect

The status of coal liquefaction pilot plants supported by US DOE is reviewed under the following headings: company involved, location, contract, funding, process name, process description, flowsheet, history and progress during the July-September 1979 quarter. Supporting projects such as test facilities, refining and upgrading coal liquids, catalyst development, and gasification of residues from coal gasification plants are discussed similarly. (LTN)

None

1980-07-01T23:59:59.000Z

471

US Energy Industry Financial Developments, 1993 fourth quarter, April 1994  

SciTech Connect

This report traces key financial trends in the US energy industry for the fourth quarter of 1993. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated electric utilities. All financial data are taken from public sources such as energy industry corporate reports and press releases, energy trade publications, and The Wall Street Journal`s Earnings Digest; return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area, these data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations. Based on information provided in 1993 fourth quarter financial disclosures, the net income for 82 petroleum companies -- including 18 majors -- was unchanged between the fourth quarter of 1992 and the fourth quarter of 1993. An 18-percent decline in crude oil prices resulted in a deterioration of the performance of upstream (oil and gas production) petroleum companies during the final quarter of 1993. However, prices for refined products fell much less than the price of crude oil, resulting in higher refined product margins and downstream (refining, marketing and transport) petroleum earnings. An increase in refined product demand also contributed to the rise in downstream income.

Not Available

1994-04-14T23:59:59.000Z

472

Meteorological and air quality data quarterly report. WIPP site: Eddy County, New Mexico. Summer quarter, June 1977-August 1977  

SciTech Connect

The purpose of the WIPP meteorological, air quality, and radiological measurements program was to support the environmental effort for the evaluation of the site suitability. This data report is the latest in a series of seasonal quarterly data summaries to be issued for the southeastern New Mexico site.

Pocalujka, L.P.; Babij, E.; Catizone, P.A.; Church, H.W.

1980-06-01T23:59:59.000Z

473

2014 NERSC User Survey  

NLE Websites -- All DOE Office Websites (Extended Search)

2014 NERSC User Survey 2014 NERSC User Survey December 17, 2014 by Francesca Verdier (0 Comments) Please take a few minutes to fill out NERSC's annual user survey. Your feedback is...

474

The role of the resid solvent in co-processing with finely divided catalysts. Quarterly report April--June 1993  

SciTech Connect

The primary purpose of the work performed this quarter was to establish under thermal and catalytic reaction conditions whether hydrogen transfer occurred between cycloalkane type structures that are present in resids and heteroatomic species that are present in coal and liquefied coal. The research this quarter focused upon evaluating benzophenone (BENZ) as a model acceptor for hydrogen that might be transferred from a cycloalkane, perhydropyrene (PHP), under coprocessing conditions. Hence, a number of reactions was performed in which BENZ was reacted alone in hydrogen and nitrogen atmospheres in the presence and absence of a catalytic agent, molybdenum naphthenate. Reactions were also performed using a combination of PHP and BENZ at a 1 to 1 weight ratio. Also performing this quarter were initial separations with petroleum resids. Two different resids were used, Maya and LHC-362. The literature was also surveyed to determine important characteristics that should be evaluated for selecting resids. The resids that are desired for this project are resids with high-, medium-, and low-naphthenic content. Different levels of asphaltenes are also desirable. Resids with these characteristics are currently being sought. The model compound PHP that had been commercially available as naphthene representative of resids is now no longer available. Hence, several scoping experiments were performed in order to determine conditions for synthesizing PHP. The synthesis procedure reported in US Patent 3,303,227 was used as a basis for this work. Although more than 85% PHP was synthesized, partially hydrogenated pyrenes were also produced which will require separation in order to obtain pure PHP.

Curtis, C.W.

1993-11-01T23:59:59.000Z

475

Customer Strategies for Responding to Day-Ahead Market HourlyElectricity Pricing  

SciTech Connect

Real-time pricing (RTP) has been advocated as an economically efficient means to send price signals to customers to promote demand response (DR) (Borenstein 2002, Borenstein 2005, Ruff 2002). However, limited information exists that can be used to judge how effectively RTP actually induces DR, particularly in the context of restructured electricity markets. This report describes the second phase of a study of how large, non-residential customers' adapted to default-service day-ahead hourly pricing. The customers are located in upstate New York and served under Niagara Mohawk, A National Grid Company (NMPC)'s SC-3A rate class. The SC-3A tariff is a type of RTP that provides firm, day-ahead notice of hourly varying prices indexed to New York Independent System Operator (NYISO) day-ahead market prices. The study was funded by the California Energy Commission (CEC)'s PIER program through the Demand Response Research Center (DRRC). NMPC's is the first and longest-running default-service RTP tariff implemented in the context of retail competition. The mix of NMPC's large customers exposed to day-ahead hourly prices is roughly 30% industrial, 25% commercial and 45% institutional. They have faced periods of high prices during the study period (2000-2004), thereby providing an opportunity to assess their response to volatile hourly prices. The nature of the SC-3A default service attracted competitive retailers offering a wide array of pricing and hedging options, and customers could also participate in demand response programs implemented by NYISO. The first phase of this study examined SC-3A customers' satisfaction, hedging choices and price response through in-depth customer market research and a Constant Elasticity of Substitution (CES) demand model (Goldman et al. 2004). This second phase was undertaken to answer questions that remained unresolved and to quantify price response to a higher level of granularity. We accomplished these objectives with a second customer survey and interview effort, which resulted in a higher, 76% response rate, and the adoption of the more flexible Generalized Leontief (GL) demand model, which allows us to analyze customer response under a range of conditions (e.g. at different nominal prices) and to determine the distribution of individual customers' response.

Goldman, Chuck; Hopper, Nicole; Bharvirkar, Ranjit; Neenan,Bernie; Boisvert, Dick; Cappers, Peter; Pratt, Donna; Butkins, Kim

2005-08-25T23:59:59.000Z

476

MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991  

SciTech Connect

This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

Not Available

1992-02-01T23:59:59.000Z

477

Definition: 2-M Probe Survey | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: 2-M Probe Survey Jump to: navigation, search Dictionary.png 2-M Probe Survey Probe surveys are used to physically identify and delineate thermal anomalies. A 2-m long hollow steel tube with a tungsten-carbide alloy tip is driven into the ground using a hammer drill. Then a high-precision resistive-temperature device is inserted into the tube. The probe is then left in place for at least one hour.[2] Also Known As Probe Survey, 30-cm Probe Survey, (Temperature) Probe Survey References ↑ Mark F. Coolbaugh,Chris Sladek,James E. Faulds,Richard E. Zehner,Gary L. Oppliger. 2007. Use of Rapid Temperature Measurements at a 2-Meter Depth to Augment Deeper Temperature Gradient Drilling. In:

478

20140301-0331_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

2014-04-07T23:59:59.000Z

479

20140601-0630_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

2014-06-30T23:59:59.000Z

480

20140701-0731_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

2014-07-31T23:59:59.000Z

Note: This page contains sample records for the topic "hours quarterly survey" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

20131201-1231_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

2014-01-08T23:59:59.000Z

482

20140201-0228_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

2014-03-03T23:59:59.000Z

483

20140501-0531_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe

2014-06-02T23:59:59.000Z

484

20131101-1130_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

2013-12-02T23:59:59.000Z

485

20130801-0831_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

2013-09-10T23:59:59.000Z

486

20130901-0930_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

Thibedeau, Joe

2013-10-25T23:59:59.000Z

487

20131001-1031_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

2013-11-05T23:59:59.000Z

488

20140101-0131_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

2014-02-03T23:59:59.000Z

489

20130501-20130531_Green Machine Florida Canyon Hourly Data  

SciTech Connect

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

2013-06-18T23:59:59.000Z

490

20140201-0228_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

Thibedeau, Joe

491

20131101-1130_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

Thibedeau, Joe

492

20140301-0331_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

Thibedeau, Joe

493

20131001-1031_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

Thibedeau, Joe

494

20140601-0630_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

Thibedeau, Joe

495

20131201-1231_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

Thibedeau, Joe

496

20130801-0831_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

Vanderhoff, Alex

497

20130501-20130531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

Vanderhoff, Alex

498

20140701-0731_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

Thibedeau, Joe

499

20140101-0131_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

Thibedeau, Joe

500

20140501-0531_Green Machine Florida Canyon Hourly Data  

DOE Data Explorer (OSTI)

Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

Thibedeau, Joe