Powered by Deep Web Technologies
Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Effect of Powder Compact Holding Time on the Microstructure and ...  

Science Conference Proceedings (OSTI)

The microstructure and mechanical properties of Ti-6Al-4V alloy and the effects of powder compact holding time on them were investigated. The results showed...

2

Recovery May Require Holding Stocks Level in February and March  

Gasoline and Diesel Fuel Update (EIA)

have dropped back as new supplies are appearing, but we still have dropped back as new supplies are appearing, but we still have nearly a month of winter ahead of us. Stocks cannot drop much farther. February 4 stock levels were just above the lowest month-end levels ever seen for PADD 1, which occurred in April 1996. For stocks to recover to the low end of the normal range, they would have to stay level in February in March, when normally they would be used to meet demand. Keeping stocks level would require finding supply to substitute for the average stock drops of 290 thousand barrels per day (8 million barrels) in February and 210 thousand barrels per day (6 million barrels) in March. If all of that supply were to come from imports, we would have to see distillate imports into PADD 1 double from their average levels of 7

3

Hold-Time Effects on Low-Cycle-Fatigue Behavior of Hastelloy X ...  

Science Conference Proceedings (OSTI)

Total strain-controlled low-cycle-fatigue tests with and without hold times were ... frequency-modified tensile-hysteresis-energy method. The predicted lives were ... usage of this material in gas-turbine and chemical-process industries is based...

4

Influence of Hold Time on Creep-Fatigue Behavior of an Advanced Austenitic Alloy  

Science Conference Proceedings (OSTI)

An advanced austenitic alloy, HT-UPS (high temperature-ultrafine precipitate strengthened), is a candidate material for the structural components of fast reactors and energy-conversion systems. HT-UPS provides improved creep resistance through a composition based on 316 stainless steel (SS) with additions of Ti and Nb to form nano-scale MC precipitates in the austenitic matrix. The low cycle fatigue and creep-fatigue behavior of a HT-UPS alloy has been investigated at 650 C, 1.0% total strain, and an R ratio of -1 with hold times as long as 9000 sec at peak tensile strain. The cyclic deformation response of HT-UPS is compared to that of 316 SS. The cycles to failure are similar, despite differences in peak stress profiles and the deformed microstructures. Cracking in both alloys is transgranular (initiation and propagation) in the case of continuous cycle fatigue, while the primary cracks also propagate transgranularly during creep-fatigue cycling. Internal grain boundary damage as a result of the tensile hold is present in the form of fine cracks for hold times of 3600 sec and longer and substantially more internal cracks are visible in 316 SS than HT-UPS. The dislocation substructures observed in the deformed material are different. An equiaxed cellular structure is observed in 316 SS, whereas tangles of dislocations are present at the nanoscale MC precipitates in HT-UPS and no cellular substructure is observed.

Mark Carroll; Laura Carroll

2011-09-01T23:59:59.000Z

5

The 8 requirements of real-time stream processing  

Science Conference Proceedings (OSTI)

Applications that require real-time processing of high-volume data steams are pushing the limits of traditional data processing infrastructures. These stream-based applications include market feed processing and electronic trading on Wall Street, network ...

Michael Stonebraker; U?ur etintemel; Stan Zdonik

2005-12-01T23:59:59.000Z

6

Holding of juvenile salmonids for surgical implantation of electronic tags: a review and recommendations  

SciTech Connect

Many telemetry based studies require that fish be sampled from the wild and then held for some amount of time both prior to and after the implantation of a transmitter. However, the effects of such holding (or the lack thereof) are often overlooked. Pre-surgical holding often occurs to facilitate logistical needs of research projects and as an attempt to minimize negative physiological effects due to capture and handling stress. Further, post-surgical holding time and conditions greatly influence the physiological state of fish prior to being returned to the wild. This paper reviews pertinent studies pertaining to the effects of surgical holding on the behavior, physiology, and survival of fishes, with particular emphasis on juvenile salmonids. The effects of individual aspects of surgical holding such as stressors, time, holding conditions and water quality are also examined. Recommendations regarding certain aspects of surgical holding (e.g., holding duration) are offered with a goal of reducing bias related to the surgical process. Pre- and post-surgical holding times of 1836 h are suggested as a general guideline for juvenile salmonids.

Oldenburg, Eric W.; Colotelo, Alison HA; Brown, Richard S.; Eppard, M. B.

2011-01-01T23:59:59.000Z

7

Solar Hold | Open Energy Information  

Open Energy Info (EERE)

Solar Hold Jump to: navigation, search Name Solar-Hold Place Sofia, Bulgaria Sector Solar Product Bulgarian solar project developer; as of September 2007, seeking permit for 10x5MW...

8

Majdaline Holdings | Open Energy Information  

Open Energy Info (EERE)

Majdaline Holdings Majdaline Holdings Jump to: navigation, search Name Majdaline Holdings Place Morocco Product Moroccan company involved in a joint venture with Asola to produce modules in the country. References Majdaline Holdings[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Majdaline Holdings is a company located in Morocco . References ↑ "Majdaline Holdings" Retrieved from "http://en.openei.org/w/index.php?title=Majdaline_Holdings&oldid=348603" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services

9

Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Holdings, Inc. Smart Grid RFI: Addressing Policy and Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges. Pepco Holdings, Inc. (PHI) is pleased to respond to the US Department of Energy (DOE) request for information regarding addressing policy and logistical challenges to smart grid implementation. This follows on the heels of PHI's responses to two other DOE RFls on data access and communications requirements. Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges More Documents & Publications DC OPC Comments. September 17, 2010 Addressing Policy and Logistical Challenges to smart grid Implementation:

10

Westside Holdings | Open Energy Information  

Open Energy Info (EERE)

Westside Holdings Westside Holdings Jump to: navigation, search Name Westside Holdings Address 676 North Michigan Avenue Suite 2850 Place Chicago, Illinois Zip 60611 Phone number 312.981.1220 Website http://www.westsideholdings.co Coordinates 41.8947801°, -87.6244809° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.8947801,"lon":-87.6244809,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

11

Elektra Holding | Open Energy Information  

Open Energy Info (EERE)

Elektra Holding Elektra Holding Jump to: navigation, search Name Elektra Holding Place Sofia, Bulgaria Sector Biomass, Hydro, Solar, Wind energy Product A company owned by a group of Spanish families operating in Bulgaria, Ukraine, Belarus, Cyprus and Mexico developing wind, small hydro, biomass and solar. Coordinates 42.697085°, 23.32455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.697085,"lon":23.32455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

12

Inci Holding | Open Energy Information  

Open Energy Info (EERE)

Inci Holding Inci Holding Jump to: navigation, search Name Inci Holding Place Izmir, Turkey Zip 35410 Sector Solar Product Turkey-based industrial group specializing in the manufacture of wheel bases and hubs, as well as batteries. The firm is a joint developer in a PV solar plant in Turkey. Coordinates 38.425147°, 27.142302° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.425147,"lon":27.142302,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

13

Can Real-Time Machine Translation Overcome Language Barriers in Distributed Requirements Engineering?  

E-Print Network (OSTI)

distant cultures with different languages and communication styles that, in turn, exacerbate communication software development requires close cooperation of individuals with distant cultural backgrounds. Cultural to explore the performance of MT in real-time text chat. The findings from our simulation are presented

Lanubile, Filippo

14

reaction (RT-PCR) to detect Kashmir bee virus (KBV). This technique requires time-  

E-Print Network (OSTI)

reaction (RT-PCR) to detect Kashmir bee virus (KBV). This technique requires time- consuming virus purification and RNA extraction steps. Hung and Shimanuki [9] developed a direct RT-PCR method of KBV detection with the sequences of many virus polyproteins. Kasmir bee virus / direct RT-PCR / pairwise comparison / phylogenetic

Recanati, Catherine

15

Sensing Requirements for Real-Time Monitoring and Control in Energy Production  

E-Print Network (OSTI)

of coal (syngas), requires physical and chemical sensors for exhaust gas monitoring as well as real-time control of the combustion process. Following a description of syngas production from coal, we outline species at 630 °C. Our SiC sensor can monitor the hydrogen concentration in a 350 °C simulated syngas

Ghosh, Ruby N.

16

Covered Product Category: Hot Food Holding Cabinets | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Food Holding Cabinets Hot Food Holding Cabinets Covered Product Category: Hot Food Holding Cabinets October 7, 2013 - 11:08am Addthis ENERGY STAR Qualified Products FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including hot food holding cabinets, which are covered by the ENERGY STAR® program. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. Manufacturers display the ENERGY STAR label on complying models. For a model not displaying the label, check the qualified products lists maintained on the ENERGY STAR website. This product category overview covers the following: Meeting Energy Efficiency Requirements

17

SITIZN Group Holding AG | Open Energy Information  

Open Energy Info (EERE)

Holding AG Jump to: navigation, search Name SITIZN Group Holding AG Place Riederich, Germany Zip 72585 Sector Solar Product Germany-based solar technology and consultancy firm....

18

On a time consistency concept in risk averse multi-stage stochastic ...  

E-Print Network (OSTI)

others do not this requirement. It should be mentioned that if the time consistency property does not hold, it does not mean that the corresponding policies are...

19

Axeon Holdings | Open Energy Information  

Open Energy Info (EERE)

Holdings Holdings Place Aberdeen, United Kingdom Zip AB22 8GT Product Owns battery and battery power management system technologies, which it is commercialising for hybrid and electric vehicle applications. Coordinates 46.975867°, -123.81598° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.975867,"lon":-123.81598,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

20

BM Holding | Open Energy Information  

Open Energy Info (EERE)

BM Holding BM Holding Jump to: navigation, search Name BM Holding Address Eskişehir Yolu Bilkent Kavşağı No:4 Place Ankara, Turkey Zip 06800 Product Turkish construction company building large scale power generating projects in Turkey, daughter company of MH Muhendislik ve Insaat. Website http://www.bmholding.com.tr/ Coordinates 39.907071°, 32.765402° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.907071,"lon":32.765402,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Apollo Solar Energy Technology Holdings Ltd former RBI Holdings Ltd | Open  

Open Energy Info (EERE)

Ltd former RBI Holdings Ltd Ltd former RBI Holdings Ltd Jump to: navigation, search Name Apollo Solar Energy Technology Holdings Ltd (former RBI Holdings Ltd) Place Kowloon, Hong Kong Sector Solar Product Hong Kong-based manufacturer of silicon-based thin film solar PV modules. References Apollo Solar Energy Technology Holdings Ltd (former RBI Holdings Ltd)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Apollo Solar Energy Technology Holdings Ltd (former RBI Holdings Ltd) is a company located in Kowloon, Hong Kong . References ↑ "Apollo Solar Energy Technology Holdings Ltd (former RBI Holdings Ltd)" Retrieved from "http://en.openei.org/w/index.php?title=Apollo_Solar_Energy_Technology_Holdings_Ltd_former_RBI_Holdings_Ltd&oldid=342234

22

BTX Holdings Inc | Open Energy Information  

Open Energy Info (EERE)

BTX Holdings Inc BTX Holdings Inc Jump to: navigation, search Name BTX Holdings Inc Place Fort Lauderdale, Florida Zip 33309 Sector Biomass Product BTX Holdings acquires, develops, and deploys technologies to process plant derived biomass waste, extract the usable fractions, and utilise or sell the extractions in further secondary processes in the United States. References BTX Holdings Inc[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. BTX Holdings Inc is a company located in Fort Lauderdale, Florida . References ↑ "BTX Holdings Inc" Retrieved from "http://en.openei.org/w/index.php?title=BTX_Holdings_Inc&oldid=343083" Categories: Clean Energy Organizations

23

3C Holding AG | Open Energy Information  

Open Energy Info (EERE)

Holding AG Holding AG Jump to: navigation, search Name 3C Holding AG Place Bad Vilbel/Frankfurt am Main, Germany Zip 61118 Sector Services Product 3C Holding AG develops trading strategies for EU allowances, JI/CDM Projects and climate neutral events, products and services. Merged with Factor Consulting to form First Climate. References 3C Holding AG[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. 3C Holding AG is a company located in Bad Vilbel/Frankfurt am Main, Germany . References ↑ "3C Holding AG" Retrieved from "http://en.openei.org/w/index.php?title=3C_Holding_AG&oldid=341624" Categories: Clean Energy Organizations Companies Organizations Stubs

24

Waste2Energy Holdings | Open Energy Information  

Open Energy Info (EERE)

Holdings Holdings Jump to: navigation, search Name Waste2Energy Holdings Place Greenville, South Carolina Zip 29609 Sector Biomass, Renewable Energy Product The Waste2Energy Holdings is a supplier of proprietary gasification technology designed to convert municipal solid waste, biomass and other solid waste streams traditionally destined for landfill into clean renewable energy. References Waste2Energy Holdings[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Waste2Energy Holdings is a company located in Greenville, South Carolina . References ↑ "Waste2Energy Holdings" Retrieved from "http://en.openei.org/w/index.php?title=Waste2Energy_Holdings&oldid=352938

25

Ultrasonic methods for locating hold-up  

SciTech Connect

Hold-up remains one of the major contributing factors to unaccounted for materials and can be a costly problem in decontamination and decommissioning activities. Ultrasonic techniques are being developed to noninvasively monitor hold-up in process equipment where the inner surface of such equipment may be in contact with the hold-up material. These techniques may be useful in improving hold-up measurements as well as optimizing decontamination techniques.

Sinha, D.N.; Olinger, C.T.

1995-09-01T23:59:59.000Z

26

NNSA Holds Radiation Emergency Consequence Management Training...  

National Nuclear Security Administration (NNSA)

Holds Radiation Emergency Consequence Management Training in Israel | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering...

27

A Method to Improve Voltage Holding Across Vacuum Electrical Gaps to  

NLE Websites -- All DOE Office Websites (Extended Search)

A Method to Improve Voltage Holding Across Vacuum Electrical Gaps to A Method to Improve Voltage Holding Across Vacuum Electrical Gaps to Improve the Performance and Reduce the Conditioning Time by Removing Bacteria, Fungi, and Other Microbial Organisms and Their Spores. -- . Inventor Larry Grisham. Disclosed is a method to potentially increase the performance of devices which employ electric field within a vacuum by increasing the magnitude of the electric field gradient which can be sustained, the reliability of the devices, and by reducing the conditioning time of devices such as charged particle accelerators when they are brought into operation. The disclosed method can be employed, for example, for devices requiring voltages across vacuum gaps, such as, but not limited to, charged particle accelerators, X-ray machines, vacuum tubes, and vacuum electrical breakers.

28

Solar Century Holdings Solarcentury | Open Energy Information  

Open Energy Info (EERE)

Holdings Solarcentury Holdings Solarcentury Jump to: navigation, search Name Solar Century Holdings (Solarcentury) Place London, Greater London, United Kingdom Zip SE1 7AB Sector Buildings, Solar Product Designs, installs and maintains solar PV and thermal systems in buildings as well as managing the sale of surplus power back to the grid. References Solar Century Holdings (Solarcentury)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Solar Century Holdings (Solarcentury) is a company located in London, Greater London, United Kingdom . References ↑ "Solar Century Holdings (Solarcentury)" Retrieved from "http://en.openei.org/w/index.php?title=Solar_Century_Holdings_Solarcentury&oldid=351254

29

Sunseeker Energy Holding AG | Open Energy Information  

Open Energy Info (EERE)

Sunseeker Energy Holding AG Sunseeker Energy Holding AG Jump to: navigation, search Name Sunseeker Energy Holding AG Place Schindellegi, Switzerland Zip 8834 Sector Solar Product Switzerland-based company seeking to developing new generation solar and hybrid power technologies for sustainable energy use. References Sunseeker Energy Holding AG[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Sunseeker Energy Holding AG is a company located in Schindellegi, Switzerland . References ↑ "Sunseeker Energy Holding AG" Retrieved from "http://en.openei.org/w/index.php?title=Sunseeker_Energy_Holding_AG&oldid=351842" Categories: Clean Energy Organizations Companies Organizations

30

SOFCo EFS Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

SOFCo EFS Holdings LLC SOFCo EFS Holdings LLC Jump to: navigation, search Name SOFCo-EFS Holdings LLC Place Alliance, Ohio Zip 44601 Product SOFCo-EFS has developed a proprietary planar SOFC design and a low cost approach to manufacturing that is expected to lead to commercially viable SOFC power systems. References SOFCo-EFS Holdings LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. SOFCo-EFS Holdings LLC is a company located in Alliance, Ohio . References ↑ "SOFCo-EFS Holdings LLC" Retrieved from "http://en.openei.org/w/index.php?title=SOFCo_EFS_Holdings_LLC&oldid=351221" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

31

System requirements for one-time-use ENRAF control panel software  

SciTech Connect

An Enraf Densitometer is installed on tank 241-AY-102. The Densitometer will frequently be tasked to obtain and log density profiles. The activity can be effected a number of ways. Enraf Incorporated provides a software package called ''Logger18'' to its customers for the purpose of in-shop testing of their gauges. Logger18 is capable of accepting an input file which can direct the gauge to obtain a density profile for a given tank level and bottom limit. Logger18 is a complex, DOS based program which will require trained technicians and/or tank farm entries to obtain the data. ALARA considerations have prompted the development of a more user-friendly, computer-based interface to the Enraf densitometers. This document records the plan by which this new Enraf data acquisition software will be developed, reviewed, verified, and released. This plan applies to the development and implementation of a one-time-use software program, which will be called ''Enraf Control Panel.'' The software will be primarily used for remote operation of Enraf Densitometers for the purpose of obtaining and logging tank product density profiles.

HUBER, J.H.

1999-08-19T23:59:59.000Z

32

Sears Holdings Corporation's Environmental Policy Statement ...  

NLE Websites -- All DOE Office Websites (Extended Search)

resources Sears Holdings Corporation's Environmental Policy Statement Creating an energy policy is a key step in formalizing your organization's commitment to saving...

33

Downhole Sensor Holds Transformative Potential - Energy ...  

SiC is a class of wide-bandgap semiconducting material that holds transformative potential not only for high-temperature electronics but also for ...

34

TWS Industrial Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

they are one of the world's largest ODM makers of Lithium Ion and Lithium Polymer batteries for portable electronic devices. References TWS Industrial (Holdings) Ltd1...

35

Accent Energy Holdings, LLC | Open Energy Information  

Open Energy Info (EERE)

Accent Energy Holdings, LLC Place Ohio Utility Id 54872 Utility Location Yes Ownership R Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 -...

36

Glacial Energy Holdings (Ohio) | Open Energy Information  

Open Energy Info (EERE)

Retrieved from "http:en.openei.orgwindex.php?titleGlacialEnergyHoldings(Ohio)&oldid412595" Categories: EIA Utility Companies and Aliases Utility Companies...

37

Oilsource Holding Group | Open Energy Information  

Open Energy Info (EERE)

consortium composed of a group of companies involved in a specific segment of the biofuel industry. References Oilsource Holding Group1 LinkedIn Connections CrunchBase...

38

Covanta Holding Corporation | Open Energy Information  

Open Energy Info (EERE)

New Jersey Zip 7004 Product A holding company with separate subsidiaries offering waste-to-energy conversion, and a variety of insurance products. Coordinates 47.38522,...

39

Intec Power Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

Kingdom Zip NG6 0GA Sector Buildings Product String representation "Intec's "Silent ... control system." is too long. References Intec Power Holdings Ltd1 LinkedIn Connections...

40

Centro Renewables Holding Limited | Open Energy Information  

Open Energy Info (EERE)

developer of wind, solar and water power facilities in China, Taiwan and South Korea. References Centro Renewables Holding Limited1 LinkedIn Connections CrunchBase...

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Scheuten Solar Holding BV | Open Energy Information  

Open Energy Info (EERE)

innovative and leading solar company that develops, produces, designs and sells PV solar modules and total PV solar solutions. References Scheuten Solar Holding BV1...

42

Increasing water holding capacity for irrigation  

NLE Websites -- All DOE Office Websites (Extended Search)

Increasing water holding capacity for irrigation Reseachers recommend solutions for sediment trapping in irrigation system LANL and SNL leveraged technical expertise to determine...

43

Real-time prediction of battery power requirements for electric vehicles  

Science Conference Proceedings (OSTI)

A battery management system (BMS) is responsible for protecting the battery from damage, predicting battery life, and maintaining the battery in an operational condition. In this paper, we propose an efficient way of predicting the power requirements ... Keywords: acceleration prediction, battery management system (BMS), electric vehicles (EVs), prediction of battery power requirement

Eugene Kim, Jinkyu Lee, Kang G. Shin

2013-04-01T23:59:59.000Z

44

Holding fixture for metallographic mount polishing  

DOE Patents (OSTI)

A fixture for holding mounted specimens for polishing, having an arm; a body attached to one end of the arm, the body having at least one flange having an opening to accommodate a mounted specimen; and a means applying pressure against the outer surface of the mounted specimen to hold the specimen in contact with the polishing surface.

Barth, C.H.; Cramer, C.E.

1996-12-31T23:59:59.000Z

45

PARS II Process Document - On Hold Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On Hold Projects PARS II Process Document - On Hold Projects This document details the process approved by the CRB for placing Capital Asset projects on hold, re-activating on hold...

46

Climate Signal Detection Times and Constraints on Climate Benchmark Accuracy Requirements  

Science Conference Proceedings (OSTI)

Long-term trends in the climate system are always partly obscured by naturally occurring interannual variability. All else being equal, the larger the natural variability, the less precisely one can estimate a trend in a time series of data. ...

Stephen S. Leroy; James G. Anderson; George Ohring

2008-02-01T23:59:59.000Z

47

Misawa Homes Holdings Inc | Open Energy Information  

Open Energy Info (EERE)

Misawa Homes Holdings Inc Misawa Homes Holdings Inc Jump to: navigation, search Name Misawa Homes Holdings Inc Place Tokyo, Japan Zip 163-0850 Product A quoted Japanese construction holding company; through its subsidiaries, offers houses and office spaces with PV rooftops. Coordinates 35.670479°, 139.740921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.670479,"lon":139.740921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

48

Edgewood Carbon Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

Edgewood Carbon Holdings LLC Edgewood Carbon Holdings LLC Jump to: navigation, search Name Edgewood Carbon Holdings LLC Place Cornwall, Vermont Zip 57530 Sector Carbon Product Edgewood Carbon Holdings LLC is active worldwide in the evolving commercialization of carbon recovery. Coordinates 50.443321°, -4.93986° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.443321,"lon":-4.93986,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

49

Intelligent Energy Holdings | Open Energy Information  

Open Energy Info (EERE)

Intelligent Energy Holdings Place London, United Kingdom Zip W1K 5DB Product Intelligent Energy provides energy solutions based on PEM fuel cells for the distributed power and...

50

AP Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

AP Holdings LLC Place Texas Utility Id 56571 Utility Location Yes Ownership R ISO Ercot Yes ISO NY Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for...

51

US Ethanol Holdings | Open Energy Information  

Open Energy Info (EERE)

investment bank and advisory firm, Geneva Capital, created in 2006 to develop 6 bioethanol plants in the US. References US Ethanol Holdings1 LinkedIn Connections CrunchBase...

52

Energy Management for Real-Time Embedded Systems with Reliability Requirements  

E-Print Network (OSTI)

With the continued scaling of CMOS technologies and reduced design margins, the reliability concerns induced by transient faults have become prominent. Moreover, the popular energy management technique dynamic voltage and frequency scaling (DVFS) has been shown to have direct and negative effects on reliability. In this work, for a set of real-time tasks, we focus on the slack allocation problem to minimize their energy consumption while preserving the overall system reliability. Building on our previous findings for a single real-time application where a recovery task was used to preserve reliability, we identify the problem of reliabilityaware energy management for multiple tasks as NP-hard and propose two polynomial-time heuristic schemes. We also investigate the effects of on-chip/off-chip workload decomposition on energy management, by considering a generalized power model. Simulation results show that ordinary energy management schemes could lead to drastically decreased system reliability, while the proposed reliability-aware heuristic schemes are able to preserve the system reliability and obtain significant energy savings at the same time.

Dakai Zhu; et al.

2006-01-01T23:59:59.000Z

53

Genmar Holdings Inc | Open Energy Information  

Open Energy Info (EERE)

Genmar Holdings Inc Genmar Holdings Inc Jump to: navigation, search Name Genmar Holdings Inc. Place Minneapolis, Minnesota Zip 55402 Sector Wind energy Product Minnesota-based boat manufacturer, whose 92% majority-owned subsidiary, VEC Technologies, plans to enter the US wind market by building three to five blade factories. Coordinates 44.979035°, -93.264929° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.979035,"lon":-93.264929,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

54

First Windfarm Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

Windfarm Holdings Ltd Windfarm Holdings Ltd Jump to: navigation, search Name First Windfarm Holdings Ltd Place Bristol, England, United Kingdom Zip BS8 1HG Sector Wind energy Product Britsol-based developer & owner of wind power generation assets. Coordinates 42.55678°, -88.050449° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.55678,"lon":-88.050449,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

Generation Resources Holding Co | Open Energy Information  

Open Energy Info (EERE)

Resources Holding Co Resources Holding Co Jump to: navigation, search Name Generation Resources Holding Co Place Leawood, Kansas Zip 66211-2607 Sector Renewable Energy, Wind energy Product Renewable energy project developer focused on wind. Coordinates 37.02958°, -94.479173° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.02958,"lon":-94.479173,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

56

Bakhu Holdings Corp | Open Energy Information  

Open Energy Info (EERE)

Bakhu Holdings Corp Bakhu Holdings Corp Jump to: navigation, search Name Bakhu Holdings Corp Place Moscow, Russian Federation Zip 105523 Sector Services, Solar Product Russia-based gold extraction services company. The firm also produces solar PV wafers and other solar products. Coordinates 55.75695°, 37.614975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.75695,"lon":37.614975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

57

Cornerstone Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

Cornerstone Holdings LLC Cornerstone Holdings LLC Jump to: navigation, search Name Cornerstone Holdings LLC Address 11001 W. 120th Ave, Suite 330 Place Broomfield, Colorado Zip 80021 Region Rockies Area Product Private equity Phone number (303) 410-2510 Website http://www.cstoneholdings.com/ Coordinates 39.914942°, -105.121139° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.914942,"lon":-105.121139,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

58

Konica Minolta Holdings | Open Energy Information  

Open Energy Info (EERE)

Konica Minolta Holdings Konica Minolta Holdings Jump to: navigation, search Name Konica Minolta Holdings Place Tokyo, Japan Sector Solar Product String representation "Japan-based pri ... thermal power." is too long. Coordinates 35.670479°, 139.740921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.670479,"lon":139.740921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

59

Public Utility Holding Company Act of 1935: 1935-1992  

Reports and Publications (EIA)

This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry.

Information Center

1993-01-01T23:59:59.000Z

60

LETTER TEMPLATE TO PROJECTS ON HOLD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ON HOLD ON HOLD DATE, 2011 NAME ORGANIZATION ADDRESS CITY, ST ZIP Dear NAME: Thank you for your ongoing interest in the Section 1705 loan guarantee program. To date, under the 1705 program, the Department of Energy (DOE) has issued conditional commitments totaling almost $11 billion to nineteen clean energy projects with total project costs of over $16 billion. These projects will support the development of our nation's 21 st century clean energy economy and create thousands of good- paying jobs. As you know, the program's limited appropriations (commitments already made will likely utilize approximately two-thirds of the program's appropriated funds), deep pool of quality applicants, and

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

International Framework for Nuclear Energy Cooperation to Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Framework for Nuclear Energy Cooperation to Hold Ministerial-Level Meeting Sept. 29 in Warsaw, Poland International Framework for Nuclear Energy Cooperation to Hold...

62

Office of Electricity Delivery And Energy Reliability To Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical...

63

American Green Holdings LLC AGH | Open Energy Information  

Open Energy Info (EERE)

Holdings LLC AGH Jump to: navigation, search Name American Green Holdings LLC (AGH) Place Montana Product Montana-based biodiesel manufacturer, using high-pressure reactors....

64

NNSA Acting Administrator Bruce Held holds all hands meeting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Media Room > Photo Gallery > NNSA Acting Administrator Bruce Held holds all ... NNSA Acting Administrator Bruce Held holds all hands meeting NNSANews posted a photo: NNSA Acting...

65

Department of Energy Will Hold a Batteries and Energy Storage...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Will Hold a Batteries and Energy Storage Information Meeting on October 21, 2011 Department of Energy Will Hold a Batteries and Energy Storage Information...

66

Glacial Energy Holdings (New York) | Open Energy Information  

Open Energy Info (EERE)

Energy Holdings (New York) Jump to: navigation, search Name Glacial Energy Holdings Place New York Utility Id 54871 References EIA Form EIA-861 Final Data File for 2010 -...

67

GCL Solar Energy Technology Holdings formerly GCL Silicon aka...  

Open Energy Info (EERE)

GCL Solar Energy Technology Holdings formerly GCL Silicon aka Jiangsu Zhongneng Polysilicon Jump to: navigation, search Name GCL Solar Energy Technology Holdings (formerly GCL...

68

China Technology Solar Power Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

Holdings Ltd Jump to: navigation, search Name China Technology Solar Power Holdings Ltd Place Hong Kong Sector Solar Product China-based solar project developer, which is actively...

69

EXEN Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

EXEN Holdings LLC EXEN Holdings LLC Jump to: navigation, search Logo: EXEN Holdings LLC Name EXEN Holdings LLC Address 1339 Simpson Way Place Escondido, California Zip 92029 Country United States Sector Efficiency Product Hydro-diesel fuel system for diesel engines Year founded 2006 Number of employees 1-10 Company Type For Profit Company Ownership Private Small Business Yes Technology Hydro-diesel fuel system. Project Effective solution to diesel engine in regards to high diesel fuel cost and lowered emissions. Phone number 760 747 7177 Website http://www.exentechnologies.co Coordinates The following coordinate was not recognized: CALIFORNIA.The following coordinate was not recognized: CALIFORNIA. Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.778261,"lon":-119.4179324,"alt":0,"address":"CALIFORNIA","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

70

High Temperature Hold Time Effects on Fine Grain Processed 718 ...  

Science Conference Proceedings (OSTI)

Abstract. Fine Grain Alloy 718 is a relatively cost effective turbine and compressor disk alloy with superior yield strength and low cycle fatigue properties.

71

Clean Cities: National Clean Fleets Partner: Enterprise Holdings  

NLE Websites -- All DOE Office Websites (Extended Search)

Enterprise Holdings to someone by E-mail Share Clean Cities: National Clean Fleets Partner: Enterprise Holdings on Facebook Tweet about Clean Cities: National Clean Fleets Partner: Enterprise Holdings on Twitter Bookmark Clean Cities: National Clean Fleets Partner: Enterprise Holdings on Google Bookmark Clean Cities: National Clean Fleets Partner: Enterprise Holdings on Delicious Rank Clean Cities: National Clean Fleets Partner: Enterprise Holdings on Digg Find More places to share Clean Cities: National Clean Fleets Partner: Enterprise Holdings on AddThis.com... Goals & Accomplishments Partnerships National Clean Fleets Partnership National Parks Initiative Electric Vehicle Infrastructure Training Program Advanced Vehicle Technology Competitions Natural Gas Transit & School Bus Users Group

72

Multitrade Biomass Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

Multitrade Biomass Holdings LLC Multitrade Biomass Holdings LLC Place Ridgeway, Virginia Zip 24148-0000 Sector Renewable Energy Product Virginia-based developer of renewable wood fired power plants and feedstock producer. Coordinates 43.001473°, -89.989356° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.001473,"lon":-89.989356,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

73

Aventine Renewable Energy Holdings | Open Energy Information  

Open Energy Info (EERE)

Aventine Renewable Energy Holdings Aventine Renewable Energy Holdings Place Pekin, Illinois Zip 61555-0010 Product Illinois-based producer and marketer of ethanol in the United States. Coordinates 47.790615°, -98.327069° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.790615,"lon":-98.327069,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

74

Public Utility Holding Company Act of 1935: 1935--1992  

SciTech Connect

This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry. The report should be of use to Federal and State regulators, trade associations, electric utilities, independent power producers, as well as decision-makers in Congress and the Administration.

Not Available

1993-01-15T23:59:59.000Z

75

AP Holdings LLC (New York) | Open Energy Information  

Open Energy Info (EERE)

icon AP Holdings LLC (New York) Jump to: navigation, search Name AP Holdings LLC Place New York Utility Id 56571 References EIA Form EIA-861 Final Data File for 2010 -...

76

Energy Plus Holdings LLC (New York) | Open Energy Information  

Open Energy Info (EERE)

Holdings LLC (New York) Jump to: navigation, search Name Energy Plus Holdings LLC Place New York Utility Id 56265 References EIA Form EIA-861 Final Data File for 2010 -...

77

Secretary Bodman and Pakistan Officials Hold High-Level Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Bodman and Pakistan Officials Hold High-Level Energy Meeting Secretary Bodman and Pakistan Officials Hold High-Level Energy Meeting March 13, 2006 - 11:48am Addthis...

78

EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware Summary Pepco Holdings, Inc., cancelled its proposed Phase II of the Mid-Atlantic Power Pathway transmission line project and DOE cancelled preparation of an EIS on the potential environmental impacts of a proposed federal loan guarantee for the project. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement

79

Broadwind Energy Formerly Tower Tech Holdings | Open Energy Information  

Open Energy Info (EERE)

Broadwind Energy Formerly Tower Tech Holdings Broadwind Energy Formerly Tower Tech Holdings Jump to: navigation, search Name Broadwind Energy (Formerly Tower Tech Holdings) Place Manitowoc, Wisconsin Zip 54221-1957 Sector Wind energy Product US-based manufacturer of wind turbine towers, turbine assemblies such as nacelles, and monopiles. References Broadwind Energy (Formerly Tower Tech Holdings)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Broadwind Energy (Formerly Tower Tech Holdings) is a company located in Manitowoc, Wisconsin . References ↑ "Broadwind Energy (Formerly Tower Tech Holdings)" Retrieved from "http://en.openei.org/w/index.php?title=Broadwind_Energy_Formerly_Tower_Tech_Holdings&oldid=343059"

80

Solar Sailor Holdings Ltd SSHL | Open Energy Information  

Open Energy Info (EERE)

Sailor Holdings Ltd SSHL Sailor Holdings Ltd SSHL Jump to: navigation, search Name Solar Sailor Holdings Ltd (SSHL) Place Chatswood, New South Wales, Australia Zip 2067 Sector Solar Product Solar Sailor 'hybrid marine power' (HMP) and 'solar wing' technology is suitable for a wide range of applications from small-unmanned vessels to large tankers, including ferries, tourist cruisers and private yachts. References Solar Sailor Holdings Ltd (SSHL)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Solar Sailor Holdings Ltd (SSHL) is a company located in Chatswood, New South Wales, Australia . References ↑ "Solar Sailor Holdings Ltd (SSHL)" Retrieved from "http://en.openei.org/w/index.php?title=Solar_Sailor_Holdings_Ltd_SSHL&oldid=35132

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Chemical Consortium Holdings Inc ChemCon | Open Energy Information  

Open Energy Info (EERE)

Consortium Holdings Inc ChemCon Consortium Holdings Inc ChemCon Jump to: navigation, search Name Chemical Consortium Holdings Inc (ChemCon) Place Bellingham, Washington State Zip 98228 Sector Hydro, Hydrogen Product Develops and operates projects in the bioethanol, biodiesel, methanol, hydrogen and liquid natural gas industries. References Chemical Consortium Holdings Inc (ChemCon)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Chemical Consortium Holdings Inc (ChemCon) is a company located in Bellingham, Washington State . References ↑ "Chemical Consortium Holdings Inc (ChemCon)" Retrieved from "http://en.openei.org/w/index.php?title=Chemical_Consortium_Holdings_Inc_ChemCon&oldid=343459

82

Specialized Technology Resources Inc STR Holding Inc | Open Energy  

Open Energy Info (EERE)

Technology Resources Inc STR Holding Inc Technology Resources Inc STR Holding Inc Jump to: navigation, search Name Specialized Technology Resources Inc (STR Holding Inc) Place Enfield, Connecticut Zip 6082 Product US-based manufacturer of EVA encapsulants for PV cells. References Specialized Technology Resources Inc (STR Holding Inc)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Specialized Technology Resources Inc (STR Holding Inc) is a company located in Enfield, Connecticut . References ↑ "Specialized Technology Resources Inc (STR Holding Inc)" Retrieved from "http://en.openei.org/w/index.php?title=Specialized_Technology_Resources_Inc_STR_Holding_Inc&oldid=351609" Categories:

83

Z Group Steel Holding Zelezarny Veseli | Open Energy Information  

Open Energy Info (EERE)

Z Group Steel Holding Zelezarny Veseli Z Group Steel Holding Zelezarny Veseli Jump to: navigation, search Name Z-Group Steel Holding - Zelezarny Veseli Place Veseli nad Moravou, Czech Republic Zip 698 12 Sector Wind energy Product Czech Republic-based steel making firm. They are diversifying into wind plant and PV plant development. References Z-Group Steel Holding - Zelezarny Veseli[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Z-Group Steel Holding - Zelezarny Veseli is a company located in Veseli nad Moravou, Czech Republic . References ↑ "Z-Group Steel Holding - Zelezarny Veseli" Retrieved from "http://en.openei.org/w/index.php?title=Z_Group_Steel_Holding_Zelezarny_Veseli&oldid=353435"

84

Associated Media Holdings Inc formerly EL Tigre Development Corp | Open  

Open Energy Info (EERE)

Media Holdings Inc formerly EL Tigre Development Corp Media Holdings Inc formerly EL Tigre Development Corp Jump to: navigation, search Name Associated Media Holdings Inc (formerly EL Tigre Development Corp) Place San Diego, California Zip 92150-2548 Product Engaged in research, development and commercialization of technologies for the production of alternative sources of fuel and the destruction and/or remediation of liquid and solid waste. References Associated Media Holdings Inc (formerly EL Tigre Development Corp)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Associated Media Holdings Inc (formerly EL Tigre Development Corp) is a company located in San Diego, California . References ↑ "Associated Media Holdings Inc (formerly EL Tigre Development

85

International Atomic Energy Agency holds conference on fusion...  

NLE Websites -- All DOE Office Websites (Extended Search)

International Atomic Energy Agency holds conference on fusion roadmap By John Greenwald November 8, 2012 Tweet Widget Facebook Like Google Plus One Hutch Neilson, third from left,...

86

Office of Electricity Delivery And Energy Reliability To Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy...

87

Energias Eolicas Europeas Holding SA | Open Energy Information  

Open Energy Info (EERE)

Place Spain Sector Wind energy Product Spain-based, company involved in the promotion of wind farms, industrial machinery and equipment. Energias Eolicas Europeas Holding SA...

88

Accent Energy Holdings, LLC (New York) | Open Energy Information  

Open Energy Info (EERE)

LLC (New York) Jump to: navigation, search Name Accent Energy Holdings, LLC Place New York Utility Id 54872 References EIA Form EIA-861 Final Data File for 2010 -...

89

The Particle Adventure | What holds it together? | Gravity  

NLE Websites -- All DOE Office Websites (Extended Search)

holds it together? > Gravity Gravity What about gravity? Gravity is weird. It is clearly one of the fundamental interactions, but the Standard Model cannot satisfactorily explain...

90

Blue Crane Holdings Pvt Ltd | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Name Blue Crane Holdings Pvt. Ltd. Place Mumbai, Maharashtra, India Zip 400023 Sector Efficiency, Solar, Wind energy Product Mumbai-based firm involved...

91

NNSA, Rosatom, UK Ministry of Defence Hold Trilateral Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

NNSA, Rosatom, UK Ministry of Defence Hold Trilateral Nuclear Security Best Practices Workshop | National Nuclear Security Administration Our Mission Managing the Stockpile...

92

NNSA Acting Administrator Bruce Held holds all hands meeting...  

NLE Websites -- All DOE Office Websites (Extended Search)

NNSA Acting Administrator Bruce Held holds all hands meeting | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

93

China Solar Energy Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

Ltd Jump to: navigation, search Name China Solar Energy Holdings Ltd Place Wan Chai, Hong Kong Sector Solar Product Supplies turnkey manufacturing lines for the production of...

94

Clear Skies Group Inc Holdings Inc | Open Energy Information  

Open Energy Info (EERE)

Sector Solar Product Designs and installs photovoltaic, solar thermal and co-generation power generation systems for domestic use. References Clear Skies Group Inc Holdings...

95

Yonghua Solar Power Investment Holding Ltd | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Yonghua Solar Power Investment Holding Ltd Jump to: navigation, search Name Yonghua Solar Power...

96

China Singyes Solar Technologies Holdings Ltd formerly known...  

Open Energy Info (EERE)

Ltd formerly known as Singyes Curtain Wall Engineering Jump to: navigation, search Name China Singyes Solar Technologies Holdings Ltd (formerly known as Singyes Curtain Wall...

97

China Power International New Energy Holding Ltd | Open Energy...  

Open Energy Info (EERE)

New Energy Holding Ltd Place Shanghai Municipality, China Zip 200052 Sector Biomass, Hydro, Solar, Wind energy Product A project developer in solar, wind, biomass and...

98

A semi-custom dual channel peak hold circuit for spaceborne instrumentation  

Science Conference Proceedings (OSTI)

A monolithic dual channel peak hold circuit is developed using a semi-custom Application Specific Integrated Circuit (ASIC). The circuit is designed specifically for spaceborne instrumentation that requires low power operation and low mass packaging. Each independent circuit holds positive pulses and consists of a differential transconductance amplifier followed by a one way current amplifier. Input gate and output hold functions are enabled by standard TTL or CMOS logic levels. To accommodate a range of applications. quiescent power is adjustable for performance-power tradeoff or can be disabled for single channel use. Fabricated with dielectrically isolated vertical geometry NPN and PNP transistors the circuit is inherently radiation-hard and immune to transient upset.

Sweet, M.R.; Grace, K.M.

1992-01-01T23:59:59.000Z

99

A semi-custom dual channel peak hold circuit for spaceborne instrumentation  

SciTech Connect

A monolithic dual channel peak hold circuit is developed using a semi-custom Application Specific Integrated Circuit (ASIC). The circuit is designed specifically for spaceborne instrumentation that requires low power operation and low mass packaging. Each independent circuit holds positive pulses and consists of a differential transconductance amplifier followed by a one way current amplifier. Input gate and output hold functions are enabled by standard TTL or CMOS logic levels. To accommodate a range of applications. quiescent power is adjustable for performance-power tradeoff or can be disabled for single channel use. Fabricated with dielectrically isolated vertical geometry NPN and PNP transistors the circuit is inherently radiation-hard and immune to transient upset.

Sweet, M.R.; Grace, K.M.

1992-12-01T23:59:59.000Z

100

Integrating usability requirements that can be evaluated in design time into Model Driven Engineering of Web Information Systems  

Science Conference Proceedings (OSTI)

In recent years, Web Engineering development projects have grown increasingly complex for and critical to the smooth running of organizations. However, recent studies reveal that a high percentage of these projects fail to attain the quality parameters ... Keywords: Requirements metamodelling, Software quality, Usability evaluation, Web engineering

Fernando Molina; Ambrosio Toval

2009-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Renegy Holdings Inc Formerly Catalytica Energy Systems Inc | Open Energy  

Open Energy Info (EERE)

Catalytica Energy Systems Inc Catalytica Energy Systems Inc Jump to: navigation, search Name Renegy Holdings Inc (Formerly Catalytica Energy Systems Inc) Place Tempe, Arizona Zip 85281 Sector Biomass Product Their primary focus has become to be a top North American producer of biomass-derived electricity using wood waste. References Renegy Holdings Inc (Formerly Catalytica Energy Systems Inc)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Renegy Holdings Inc (Formerly Catalytica Energy Systems Inc) is a company located in Tempe, Arizona . References ↑ "Renegy Holdings Inc (Formerly Catalytica Energy Systems Inc)" Retrieved from "http://en.openei.org/w/index.php?title=Renegy_Holdings_Inc_Formerly_Catalytica_Energy_Systems_Inc&oldid=350290"

102

Private Medical Insurance for full-time Non-EEA Students. All non-EEA students are required to have private medical insurance when coming to and  

E-Print Network (OSTI)

Private Medical Insurance for full-time Non-EEA Students. All non-EEA students are required to have private medical insurance when coming to and residing in Ireland for the purpose of study. The private medical insurance should provide cover for accident and/or disease and should cover the student for any

103

Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios  

Science Conference Proceedings (OSTI)

The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. Packable or Portable small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, packable and portable UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

2005-10-01T23:59:59.000Z

104

Nippon Mining Holdings Inc aka Shinnikko | Open Energy Information  

Open Energy Info (EERE)

Mining Holdings Inc aka Shinnikko Mining Holdings Inc aka Shinnikko Jump to: navigation, search Name Nippon Mining Holdings Inc (aka Shinnikko) Place Tokyo, Japan Zip 105-0001 Product Japanese holding company engaged in oil, metals, and electronics businesses. Coordinates 35.670479°, 139.740921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.670479,"lon":139.740921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

SEC HoldCo SA | Open Energy Information  

Open Energy Info (EERE)

and ownership of wind farms. References SEC HoldCo SA1 LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now This article is a stub. You can help OpenEI...

106

Innolas Holding GmbH | Open Energy Information  

Open Energy Info (EERE)

Zip D 82152 Sector Solar Product Manufactures equipment to produce crystalline silicon solar cells, thin film panels and wafers. References Innolas Holding GmbH1 LinkedIn...

107

First look at cellulose's early production could hold keys to...  

NLE Websites -- All DOE Office Websites (Extended Search)

cellulose's early production could hold keys to bacteria-free medical devices, better biofuel By Jared Sagoff * May 14, 2013 Tweet EmailPrint Produced by plants as well as algae...

108

Global Energy Holdings Group formerly Xethanol Corporation | Open Energy  

Open Energy Info (EERE)

Holdings Group formerly Xethanol Corporation Holdings Group formerly Xethanol Corporation Jump to: navigation, search Name Global Energy Holdings Group (formerly Xethanol Corporation) Place Atlanta, Georgia Zip 30326 Sector Biomass Product Focuses on the emerging cellulosic biomass-to-ethanol industry. Coordinates 33.748315°, -84.391109° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.748315,"lon":-84.391109,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

GNEP Nations Hold Infrastructure Development Working Group Meeting |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GNEP Nations Hold Infrastructure Development Working Group Meeting GNEP Nations Hold Infrastructure Development Working Group Meeting GNEP Nations Hold Infrastructure Development Working Group Meeting December 10, 2008 - 5:11pm Addthis WASHINGTON, DC - Representatives from the U.S. Department of Energy (DOE) participated this week in the third Global Nuclear Energy Partnership (GNEP) Infrastructure Development Working Group (IDWG), underscoring the Department's commitment to ensuring that global expansion of civilian nuclear power is done safely and securely, while reducing the risk of nuclear proliferation and responsibly managing waste. The IDWG, held December 8th and 9th in Vienna, Austria, includes over 70 participants from 22 countries working to support the sharing of educational resources, the promotion of technical educational opportunities and the establishment of

110

Nobao Renewable Energy Holdings Ltd | Open Energy Information  

Open Energy Info (EERE)

Nobao Renewable Energy Holdings Ltd Nobao Renewable Energy Holdings Ltd Jump to: navigation, search Name Nobao Renewable Energy Holdings Ltd Place Shanghai, Shanghai Municipality, China Zip 201103 Sector Geothermal energy Product China-based geothermal heat pump provider. Coordinates 31.247709°, 121.472618° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.247709,"lon":121.472618,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

111

GNEP Nations Hold Infrastructure Development Working Group Meeting |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GNEP Nations Hold Infrastructure Development Working Group Meeting GNEP Nations Hold Infrastructure Development Working Group Meeting GNEP Nations Hold Infrastructure Development Working Group Meeting December 10, 2008 - 5:11pm Addthis WASHINGTON, DC - Representatives from the U.S. Department of Energy (DOE) participated this week in the third Global Nuclear Energy Partnership (GNEP) Infrastructure Development Working Group (IDWG), underscoring the Department's commitment to ensuring that global expansion of civilian nuclear power is done safely and securely, while reducing the risk of nuclear proliferation and responsibly managing waste. The IDWG, held December 8th and 9th in Vienna, Austria, includes over 70 participants from 22 countries working to support the sharing of educational resources, the promotion of technical educational opportunities and the establishment of

112

National Air & Space Intelligence Center Holds Program About Empowering  

NLE Websites -- All DOE Office Websites (Extended Search)

National Air & Space Intelligence Center Holds Program About National Air & Space Intelligence Center Holds Program About Empowering Women in the Workplace National Air & Space Intelligence Center Holds Program About Empowering Women in the Workplace September 30, 2013 - 4:52pm Addthis Dot Harris, Director of the Office of Economic Impact and Diversity, speaks with Aurea Rivera, President and CEO of Imagineering Results Analysis Corp., Kathleen Tucker, Director of the Information Exploitation Squadron, Global Exploitation Intelligence Group, NAISC, and Ann Carbonell, Chief of the National Geospatial Intelligence Agency Support Team in September 2013. Photo by National Air and Space Intelligence Center. Dot Harris, Director of the Office of Economic Impact and Diversity, speaks with Aurea Rivera, President and CEO of Imagineering Results Analysis

113

ScottishPower Renewable Energy Holdings | Open Energy Information  

Open Energy Info (EERE)

ScottishPower Renewable Energy Holdings ScottishPower Renewable Energy Holdings Jump to: navigation, search Name ScottishPower Renewable Energy Holdings Place Glasgow, Scotland, United Kingdom Zip G2 8SP Sector Wind energy Product Developer & owner of wind energy generation assets in both the UK & US. Coordinates 55.857809°, -4.242511° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.857809,"lon":-4.242511,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

114

PPL Energy Services Holdings LLC | Open Energy Information  

Open Energy Info (EERE)

Energy Services Holdings LLC Energy Services Holdings LLC Jump to: navigation, search Name PPL Energy Services Holdings LLC Place Allentown, Pennsylvania Zip 18101 Product Focused developing and owning energy generation assets. Coordinates 40.60257°, -75.470204° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.60257,"lon":-75.470204,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

115

International Framework for Nuclear Energy Cooperation to Hold  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Framework for Nuclear Energy Cooperation to Hold International Framework for Nuclear Energy Cooperation to Hold Ministerial-Level Meeting Sept. 29 in Warsaw, Poland International Framework for Nuclear Energy Cooperation to Hold Ministerial-Level Meeting Sept. 29 in Warsaw, Poland September 6, 2011 - 3:23pm Addthis Washington, D.C. - The U.S. Department of Energy today announced that Deputy Secretary of Energy Daniel Poneman will lead the U.S. delegation to the International Framework for Nuclear Energy Cooperation (IFNEC) Executive Committee Meeting on Sept. 29 in Warsaw, Poland. The ministerial-level conference aims to advance cooperation among participating states to support the peaceful use of nuclear energy in a manner that meets high standards of safety, security and nonproliferation. The meeting will also feature video remarks by Microsoft founder Bill

116

Office of Electricity Delivery And Energy Reliability To Hold Technical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery And Energy Reliability To Hold Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission February 5, 2009 - 10:57am Addthis On March 4, 2009, the Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) will conduct a technical conference in the Washington, DC area to discuss the design of future electric transmission. The technical conference will discuss the likely demand for future electric transmission and whether the development of conceptual alternative extra high voltage (EHV) systems would assist generation developers, State energy policy officials, utility planners, and other

117

NNSA Holds Groundbreaking at MOX Facility | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Groundbreaking at MOX Facility | National Nuclear Security Groundbreaking at MOX Facility | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > NNSA Holds Groundbreaking at MOX Facility NNSA Holds Groundbreaking at MOX Facility October 14, 2005 Aiken, SC NNSA Holds Groundbreaking at MOX Facility

118

International Framework for Nuclear Energy Cooperation to Hold  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Framework for Nuclear Energy Cooperation to Hold Framework for Nuclear Energy Cooperation to Hold Ministerial-Level Meeting Sept. 29 in Warsaw, Poland International Framework for Nuclear Energy Cooperation to Hold Ministerial-Level Meeting Sept. 29 in Warsaw, Poland September 6, 2011 - 3:10pm Addthis Washington, D.C. - The U.S. Department of Energy today announced that Deputy Secretary of Energy Daniel Poneman will lead the U.S. delegation to the International Framework for Nuclear Energy Cooperation (IFNEC) Executive Committee Meeting on Sept. 29 in Warsaw, Poland. The ministerial-level conference aims to advance cooperation among participating states to support the peaceful use of nuclear energy in a manner that meets high standards of safety, security and nonproliferation. The meeting will also feature video remarks by Microsoft founder Bill

119

PARS II On Hold Projects, V-2013-04-02 Page 1 PARS II Process...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On Hold Projects, V-2013-04-02 Page 1 PARS II Process Document ON HOLD PROJECTS - Place On Hold, Re-Activate, and Cancel PURPOSE The purpose of this document is to describe the...

120

Effects of Financial Holding Company Act on bank efficiency and productivity in Taiwan  

Science Conference Proceedings (OSTI)

Taiwan's banking industry has experienced greatly structural changes since the implementing of Financial Holding Company Act in July 2001. The paper investigates whether Taiwan's commercial banks establishing or joining in financial holding companies ... Keywords: Efficiency, Financial holding companies, Productivity change

Chei-Chang Chiou

2009-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The Particle Adventure | What holds it together? | Strong  

NLE Websites -- All DOE Office Websites (Extended Search)

The Standard Model > What holds it together? > Strong The Standard Model > What holds it together? > Strong Strong To understand what is happening inside the nucleus, we need to understand more about the quarks that make up the protons and neutrons in the nucleus. Quarks have electromagnetic charge, and they also have an altogether different kind of charge called color charge. The force between color-charged particles is very strong, so this force is "creatively" called The strong force holds quarks together to form hadrons, so its carrier particles are whimsically called gluons because they so tightly "glue" quarks together. (Other name candidates included the "hold-on," the "duct-tape-it-on," and the "tie-it-on!") Color charge behaves differently than electromagnetic charge. Gluons, themselves, have color charge, which is weird and not at all like photons which do not have electromagnetic charge. And while quarks have color charge, composite particles made out of quarks have no net color charge (they are color neutral). For this reason, the strong force only takes place on the really small level of quark interactions, which is why you are not aware of the strong force in your everyday life

122

Updated: September, 2012 Intent to Hold FPM Course/Test  

E-Print Network (OSTI)

Updated: September, 2012 FORM A Intent to Hold FPM Course/Test Which course are you conducting? (check only one) 2-day course 1-day course Test only Re-Test only Test & Re-Test Food Handlers What date(s) are you conducting the training/testing? ______________________________ (mm

123

Apparatus for removably holding a plurality of microballoons  

DOE Patents (OSTI)

The present invention relates generally to the manipulation of microballoons and more particularly to an apparatus for removably holding a plurality of microballoons in order to more efficiently carry out the filling of the microballoons with a known quantity of gas.

Jorgensen, B.S.

1984-06-05T23:59:59.000Z

124

Questions and Answers - What holds an electron revolving around the  

NLE Websites -- All DOE Office Websites (Extended Search)

do I read an electronconfiguration table? do I read an electron<br>configuration table? Previous Question (How do I read an electron configuration table?) Questions and Answers Main Index Next Question (What keeps electrons revolving around the nucleus of an atom?) What keeps electrons revolvingaround the nucleus of an atom? What holds an electron revolving around the nucleus? Why don't they just go zooming around everywhere? What causes the force that holds atoms together? The answer is electricity and magnetism. The atom's center, or nucleus, is positively charged and the electrons that whirl around this nucleus are negatively charged, so they attract each other. The reason the force is strong is because the atom is so small. The distance between the nucleus and the electrons is about 1

125

The Particle Adventure | What holds it together? | Quarks emit gluons  

NLE Websites -- All DOE Office Websites (Extended Search)

holds it together? > Quarks emit gluons holds it together? > Quarks emit gluons Quarks emit gluons Color charge is always conserved. When a quark emits or absorbs a gluon, that quark's color must change in order to conserve color charge. For example, suppose a red quark changes into a blue quark and emits a red/antiblue gluon (the image below illustrates antiblue as yellow). The net color is still red. This is because - after the emission of the gluon - the blue color of the quark cancels with the antiblue color of the gluon. The remaining color then is the red color of the gluon. Quarks emit and absorb gluons very frequently within a hadron, so there is no way to observe the color of an individual quark. Within a hadron, though, the color of the two quarks exchanging a gluon will change in a way that keeps the bound system in a color-neutral state.

126

EV Sales Skyrocketing. eGallon Holds Steady. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Sales Skyrocketing. eGallon Holds Steady. EV Sales Skyrocketing. eGallon Holds Steady. EV Sales Skyrocketing. eGallon Holds Steady. July 19, 2013 - 8:45am Addthis eGallon: Compare the costs of driving with electricity What is eGallon? It is the cost of fueling a vehicle with electricity compared to a similar vehicle that runs on gasoline. Did you know? On average, it costs about 3 times less to drive an electric vehicle. Find out how much it costs to fuel an electric vehicle in your state regular gasoline 0 6 4 1 0 3 · 0 2 0 4 8 6 0 8 9 2 3 5 0 electric eGallon 0 4 1 7 2 3 3 · 0 4 2 0 4 6 0 8 5 9 1 5 0 Data and Methodology The eGallon price is calculated using the most recently available state by state residential electricity prices. The state gasoline price above is either the statewide average retail price or a multi-state regional average

127

Net Power Technology NP Holdings or NPH | Open Energy Information  

Open Energy Info (EERE)

Net Power Technology NP Holdings or NPH Net Power Technology NP Holdings or NPH Jump to: navigation, search Name Net Power Technology (NP Holdings or NPH) Place Chanchun, Jilin Province, China Sector Efficiency, Renewable Energy Product China-based company, focused on electricity storage systems based on zinc-bromide redox flow cells for renewable energy and energy efficiency applications. Coordinates 40.911701°, 45.354198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.911701,"lon":45.354198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

128

The Particle Adventure | What holds it together? | The four interactions  

NLE Websites -- All DOE Office Websites (Extended Search)

The Standard Model > What holds it together? > The four interactions The Standard Model > What holds it together? > The four interactions The four interactions Now we think we have a good idea of what the world is made of: quarks and leptons. So... What holds it together? The universe, which we know and love, exists because the fundamental particles interact. These interactions include attractive and repulsive forces, decay, and annihilation. There are four fundamental interactions between particles, and all forces in the world can be attributed to these four interactions! That's right: Any force you can think of -- friction, magnetism, gravity, nuclear decay, and so on -- is caused by one of these four fundamental interactions. What's the difference between a force and an interaction? This is a hard distinction to make. Strictly speaking, a force is the effect on a particle due to the presence of other particles. The interactions of a particle include all the forces that affect it, but also include decays and annihilations that the particle might go through. (We will spend the next chapter discussing these decays and annihilations in more depth.)

129

GCL Solar Energy Technology Holdings formerly GCL Silicon aka Jiangsu  

Open Energy Info (EERE)

Solar Energy Technology Holdings formerly GCL Silicon aka Jiangsu Solar Energy Technology Holdings formerly GCL Silicon aka Jiangsu Zhongneng Polysilicon Jump to: navigation, search Name GCL Solar Energy Technology Holdings (formerly GCL Silicon, aka Jiangsu Zhongneng Polysilicon) Place Xuzhou, Jiangsu Province, China Zip 221131 Sector Solar Product China-based solar grade polysilicon producer. Coordinates 34.255489°, 117.190201° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.255489,"lon":117.190201,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

130

China Singyes Solar Technologies Holdings Ltd formerly known as Singyes  

Open Energy Info (EERE)

Singyes Solar Technologies Holdings Ltd formerly known as Singyes Singyes Solar Technologies Holdings Ltd formerly known as Singyes Curtain Wall Engineering Jump to: navigation, search Name China Singyes Solar Technologies Holdings Ltd (formerly known as Singyes Curtain Wall Engineering) Place Zhuhai, Guangdong Province, China Sector Solar Product The company China Singyes is a curtain wall engineering company that has partnered with Solar Thin Films to build solar module capacity in China for the domestic BIPV market. Coordinates 22.277°, 113.556808° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":22.277,"lon":113.556808,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

131

Gamesa Energie Deutschland formerly EBV Management Holding AG | Open Energy  

Open Energy Info (EERE)

Deutschland formerly EBV Management Holding AG Deutschland formerly EBV Management Holding AG Jump to: navigation, search Name Gamesa Energie Deutschland (formerly EBV Management Holding AG) Place Oldenburg, Germany Zip 26122 Sector Wind energy Product German wind farm developer focused on developing and constructing wind farms in prepration for a sale to third party investors on commissioning. Coordinates 53.138699°, 8.21144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.138699,"lon":8.21144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

132

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

133

The Particle Adventure | What holds it together? | The unseen effect  

NLE Websites -- All DOE Office Websites (Extended Search)

The Standard Model > What holds it together? > The unseen effect The Standard Model > What holds it together? > The unseen effect The unseen effect You can think about forces as being analogous to the following situation: Two people are standing on an ice pond. One person moves their arm and is pushed backwards; a moment later the other person grabs at an invisible object and is driven backwards. Even though you cannot see a basketball, you can assume that one person threw a basketball to the other person because you see its effect on the people. (Click on the checkmark or cross below the animation in order to make the basketball appear or disappear.) It turns out that all interactions which affect matter particles are due to an exchange of force carrier particles, a different type of particle altogether. These particles are like basketballs tossed between matter particles (which are like the basketball players). What we normally think of as "forces" are actually the effects of force carrier particles on matter particles.

134

The Particle Adventure | What holds it together? | Color charge  

NLE Websites -- All DOE Office Websites (Extended Search)

The Standard Model > What holds it together? > Color charge The Standard Model > What holds it together? > Color charge Color charge Quarks and gluons are color-charged particles. Just as electrically-charged particles interact by exchanging photons in electromagnetic interactions, color-charged particles exchange gluons in strong interactions. When two quarks are close to one another, they exchange gluons and create a very strong color force field that binds the quarks together. The force field gets stronger as the quarks get further apart. Quarks constantly change their color charges as they exchange gluons with other quarks. How does color charge work? There are three color charges and three corresponding anticolor (complementary color) charges. Each quark has one of the three color charges and each antiquark has one of the three anticolor charges. Just as a mix of red, green, and blue light yields white light, in a baryon a combination of "red," "green," and "blue" color charges is color neutral, and in an antibaryon "antired," "antigreen," and "antiblue" is also color neutral. Mesons are color neutral because they carry combinations such as "red" and "antired."

135

PARS II On Hold Projects, V-2013-04-02 Page 1 PARS II Process Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On Hold Projects, V-2013-04-02 Page 1 On Hold Projects, V-2013-04-02 Page 1 PARS II Process Document ON HOLD PROJECTS - Place On Hold, Re-Activate, and Cancel PURPOSE The purpose of this document is to describe the process of placing active pre CD-2 capital asset projects on hold, removing projects from hold through re-activation or cancellation, and reporting of these projects in PARS II. SCOPE This process applies to active pre CD-2 capital asset projects and On Hold Pre CD-2 Capital Asset Projects only that were identified by the project team and approved by Acquisition Executive (AE), or Secretarial Acquisition Executive (SAE) for Major Systems Projects, as on hold. PROCESS The goal of the process is to ensure adherence to rules identified by Change Review Board (CRB) for placing

136

SunE U6 Holdings LLC (Colorado) | Open Energy Information  

Open Energy Info (EERE)

U6 Holdings LLC (Colorado) Jump to: navigation, search Name SunE U6 Holdings LLC Place Colorado Utility Id 56431 References EIA Form EIA-861 Final Data File for 2010 -...

137

GRR/Elements/18-CA-c.14 - Allow Public Comment and Hold Hearing...  

Open Energy Info (EERE)

and Hold Hearing DTSC allows for a 45 day public comment period on the Draft Hazardous Waste Facility Permit and holds a public hearing. Retrieved from "http:en.openei.orgw...

138

Los Alamos Biosafety committee will hold meeting June 10  

NLE Websites -- All DOE Office Websites (Extended Search)

Biosafety committee meeting June 10 Biosafety committee meeting June 10 Los Alamos Biosafety Committee will hold meeting June 10 The committee is responsible for reviewing and approving all proposals, activities, and experiments involving an organism or product of an organism that presents a risk to humans. June 5, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

139

The Particle Adventure | What holds it together? | Quark confinement  

NLE Websites -- All DOE Office Websites (Extended Search)

Quark confinement Quark confinement Quark confinement Color-charged particles cannot be found individually. For this reason, the color-charged quarks are confined in groups (hadrons) with other quarks. These composites are color neutral. The development of the Standard Model's theory of the strong interactions reflected evidence that quarks combine only into baryons (three quark objects), and mesons (quark-antiquark objects), but not, for example, four-quark objects. Now we understand that only baryons (three different colors) and mesons (color and anticolor) are color-neutral. Particles such as ud or uddd that cannot be combined into color-neutral states are never observed. Color-Force Field The quarks in a given hadron madly exchange gluons. For this reason, physicists talk about the color-force field which consists of the gluons holding the bunch of quarks together.

140

New Generation Biofuels Holdings Inc formerly H2Diesel | Open Energy  

Open Energy Info (EERE)

Generation Biofuels Holdings Inc formerly H2Diesel Generation Biofuels Holdings Inc formerly H2Diesel Jump to: navigation, search Name New Generation Biofuels Holdings Inc. (formerly H2Diesel) Place Lake Mary, Florida Zip 32746 Product Florida-based developer of innovative biodiesel projects and technologies. References New Generation Biofuels Holdings Inc. (formerly H2Diesel)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. New Generation Biofuels Holdings Inc. (formerly H2Diesel) is a company located in Lake Mary, Florida . References ↑ "New Generation Biofuels Holdings Inc. (formerly H2Diesel)" Retrieved from "http://en.openei.org/w/index.php?title=New_Generation_Biofuels_Holdings_Inc_formerly_H2Diesel&oldid=349166"

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto  

NLE Websites -- All DOE Office Websites (Extended Search)

6: January 3, 6: January 3, 2011 Consumers Hold onto Vehicles Longer to someone by E-mail Share Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on Facebook Tweet about Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on Twitter Bookmark Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on Google Bookmark Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on Delicious Rank Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on Digg Find More places to share Vehicle Technologies Office: Fact #656: January 3, 2011 Consumers Hold onto Vehicles Longer on AddThis.com...

142

International Workshop on Best Practices in Material Hold-Up Monitoring  

Science Conference Proceedings (OSTI)

In the fall of 2006, the Oak Ridge National Laboratory (ORNL) hosted an INMM-sponsored International Workshop on Best Practices in Material Hold-Up Monitoring. This workshop represented the first time in over 20 years that the international community had gathered to discuss pertinent hold-up topics and needs. More than one hundred people attended the workshop. Their expertise in the field ranged from novice to expert, and they shared their experiences and expertise throughout the week of the workshop. Presenters discussed techniques that have been used worldwide to detect and characterize nuclear materials held up in processes and equipment and the policies used to report quantities detected. The primary goal of the workshop was to compile information on the best practices and lessons learned and to make this information available for sharing throughout the international community. This paper discusses the information that was produced from four separate working groups (each composed of workshop attendees). Each group was tasked to determine what it felt to be the best practices in the field today and what issues needed to be addressed to move the field forward in the 21st century.

Pickett, Chris A [ORNL; Coates, Cameron W [ORNL

2008-01-01T23:59:59.000Z

143

Shippers. general requirements for shipments and packagings. transportation of methane in specification DOT 3AX, 3AAX, and 3T cylinders. an extension of time to file comments  

SciTech Connect

An extension of time to file comments on regulations for transportation of methane in specification DOT 3AX, 3AAX, and 3T cylinders is issued by the U.S. Materials Transportation Bureau. The time for filing comments is extended from 5/3/78 to 7/17/78.

1978-05-18T23:59:59.000Z

144

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

145

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

146

Stanford's nanowire battery holds 10 times the charge of existing ones Stanford Report, December 18, 2007  

E-Print Network (OSTI)

by rooftop solar panels. "Given the mature infrastructure behind silicon, this new technology can be pushed

Cui, Yi

147

Hydrodynamic Studies in a Centrifugal Contactor Separator; Liquid Hold-up, Residence Time Distribution, Phase  

E-Print Network (OSTI)

Liquid-Liquid Extraction in Centrifugal Contactor Separators Boelo Schuur, Joelle Floure, Andy Hallett centrifugal contactor separator; process intensification; enantioselectivity; 3,5-dinitrobenzoyl alkaloid extractant (C) in 1,2- dichloroethane using a Centrifugal Contact Separator (CCS) was studied

Groningen, Rijksuniversiteit

148

The Effect of Microstructure, Temperature, and Hold-Time on Low ...  

Science Conference Proceedings (OSTI)

an order of magnitude at elevated tem- peratures by simple heat treatments. The life was largest for the micro- structure that promoted the most homogeneous...

149

Voltage holding study of 1 MeV accelerator for ITER neutral beam injector  

Science Conference Proceedings (OSTI)

Voltage holding test on MeV accelerator indicated that sustainable voltage was a half of that of ideal quasi-Rogowski electrode. It was suggested that the emission of the clumps is enhanced by a local electric field concentration, which leads to discharge initiation at lower voltage. To reduce the electric field concentration in the MeV accelerator, gaps between the grid supports were expanded and curvature radii at the support corners were increased. After the modifications, the accelerator succeeded in sustaining -1 MV in vacuum without beam acceleration. However, the beam energy was still limited at a level of 900 keV with a beam current density of 150 A/m{sup 2} (346 mA) where the 3 x 5 apertures were used. Measurement of the beam profile revealed that deflection of the H{sup -} ions was large and a part of the H{sup -} ions was intercepted at the acceleration grid. This causes high heat load on the grids and the breakdowns during beam acceleration. To suppress the direct interception, new grid system was designed with proper aperture displacement based on a 3D beam trajectory analysis. As the result, the beam deflection was compensated and the voltage holding during the beam acceleration was improved. Beam parameter of the MeV accelerator was increased to 980 keV, 185 A/m{sup 2} (427 mA), which is close to the requirement of ITER accelerator (1 MeV, 200 A/m{sup 2}).

Taniguchi, M.; Kashiwagi, M.; Umeda, N.; Dairaku, M.; Takemoto, J.; Tobari, H.; Tsuchida, K.; Yamanaka, H.; Watanabe, K.; Kojima, A.; Hanada, M.; Sakamoto, K.; Inoue, T. [Japan Atomic Energy Agency (JAEA), 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan)

2012-02-15T23:59:59.000Z

150

BioCentric Energy Inc formerly Nano Chemical Systems Holdings | Open Energy  

Open Energy Info (EERE)

BioCentric Energy Inc formerly Nano Chemical Systems Holdings BioCentric Energy Inc formerly Nano Chemical Systems Holdings Jump to: navigation, search Name BioCentric Energy Inc (formerly Nano Chemical Systems Holdings) Place Santa Ana, California Zip 90707 Product California-based development-stage company that manufactures and sells closed-loop photobioreactor systems for growing algae. References BioCentric Energy Inc (formerly Nano Chemical Systems Holdings)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. BioCentric Energy Inc (formerly Nano Chemical Systems Holdings) is a company located in Santa Ana, California . References ↑ "BioCentric Energy Inc (formerly Nano Chemical Systems Holdings)" Retrieved from

151

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

152

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

153

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

154

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

155

Apparatus and method for generating a magnetic field by rotation of a charge holding object  

DOE Patents (OSTI)

A device and a method for the production of a magnetic field using a Charge Holding Object that is mechanically rotated. In a preferred embodiment, a Charge Holding Object surrounding a sample rotates and subjects the sample to one or more magnetic fields. The one or more magnetic fields are used by NMR Electronics connected to an NMR Conductor positioned within the Charge Holding Object to perform NMR analysis of the sample.

Gerald, II, Rex E. (Brookfield, IL); Vukovic, Lela (Westchester, IL); Rathke, Jerome W. (Homer Glenn, IL)

2009-10-13T23:59:59.000Z

156

NIST to Hold Public Meeting on WTC Investigation in NYC on ...  

Science Conference Proceedings (OSTI)

NIST to Hold Public Meeting on WTC Investigation in NYC on February 12. ... specific technical aspects of the individual projects as reported in our ...

2011-10-11T23:59:59.000Z

157

US, China Hold Joint Meeting to Discuss Peaceful Uses of Nuclear...  

National Nuclear Security Administration (NNSA)

China Hold Joint Meeting to Discuss Peaceful Uses of Nuclear Technology | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation...

158

10:30AM TODAY: Senior Administration Officials to Hold a Background...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Officials will hold a background conference call regarding the ongoing oil supply disruptions in the Middle East and North Africa and the announcement this...

159

SOLVENT HOLD TANK SAMPLE RESULTS FOR MCU-13-189, MCU-13-190, AND MCU-13-191: QUARTERLY SAMPLE FROM SEPTEMBER 2013  

SciTech Connect

Savannah River National Laboratory (SRNL) analyzed solvent samples from Modular Caustic-Side Solvent Extraction Unit (MCU) in support of continuing operations. A quarterly analysis of the solvent is required to maintain solvent composition within specifications. Analytical results of the analyses of Solvent Hold Tank (SHT) samples MCU-13-189, MCU-13-190, and MCU-13-191 received on September 4, 2013 are reported. The results show that the solvent (remaining heel in the SHT tank) at MCU contains excess Isopar? L and a deficit concentration of modifier and trioctylamine when compared to the standard MCU solvent. As with the previous solvent sample results, these analyses indicate that the solvent does not require Isopar? L trimming at this time. Since MCU is switching to NGS, there is no need to add TOA nor modifier. SRNL also analyzed the SHT sample for {{sup 137}Cs content and determined the measured value is within tolerance and the value has returned to levels observed in 2011.

Fondeur, F.; Taylor-Pashow, K.

2013-10-31T23:59:59.000Z

160

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NIST Will Hold 'Big Data' Workshop June 13-14  

Science Conference Proceedings (OSTI)

... from medical professionals to marketing firms, who ... of data to find relevant information, but both ... abnormalities through real-time analysis of video ...

2013-07-08T23:59:59.000Z

162

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Space, Time and Einstein Space, Time and Einstein Length of time: 40-55 minutes Room preference: Single or double classroom, Auditorium or all-purpose room. Space, Time and Einstein is best presented in a room that can be darkened and lights turned off and on. (Make plans by e-mail directly with your volunteer presenter.) To help make a Space, Time and Einstein presentation run smoothly, we ask the following: Make sure the scientist has exact directions to your school and any parking and delivery information. Please review basic concepts with the students before the presentation. They will understand more if they have these concepts fresh in mind. These classroom presentations are intended to enhance your classroom curriculum. This presentation is designed for students in 7th-12th grades.

163

Texas Tech University Upward Bound Programs WAIVER OF LIABILITY AND HOLD HARMLESS AGREEMENT  

E-Print Network (OSTI)

Texas Tech University Upward Bound Programs WAIVER OF LIABILITY AND HOLD HARMLESS AGREEMENT's participation in Texas Tech University Upward Bound Programs, I hereby RELEASE, WAIVE, DISCHARGE, and HOLD HARMLESS Tech University Upward Bound Programs, Texas Tech University, the Board of Regents, the State

Zhang, Yuanlin

164

T-729: Mozilla Code Installation Through Holding Down Enter | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Mozilla Code Installation Through Holding Down Enter 9: Mozilla Code Installation Through Holding Down Enter T-729: Mozilla Code Installation Through Holding Down Enter September 29, 2011 - 8:30am Addthis PROBLEM: Mozilla Code Installation Through Holding Down Enter. PLATFORM: Versions prior to the following are vulnerable: Firefox 7.0 Firefox 3.6.23 Thunderbird 7.0 SeaMonkey 2.4 ABSTRACT: Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks. reference LINKS: Mozilla Foundation Security Advisory 2011-40 Firefox Security Advisories CVE-2011-2372 CVE-2011-3001 IMPACT ASSESSMENT: High Discussion: If a user holds down the Enter key--as part of a game or test, perhaps--a

165

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Light And Color Length of time: 40-55 minutes Room preference: Double classroom or all-purpose room. Light and Color is best presented in a room that can be darkened and lights...

166

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

167

Alternative Fuels Data Center: Propane Supplier Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Supplier Propane Supplier Requirements to someone by E-mail Share Alternative Fuels Data Center: Propane Supplier Requirements on Facebook Tweet about Alternative Fuels Data Center: Propane Supplier Requirements on Twitter Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Google Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Delicious Rank Alternative Fuels Data Center: Propane Supplier Requirements on Digg Find More places to share Alternative Fuels Data Center: Propane Supplier Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Propane Supplier Requirements A retail supplier may only distribute liquefied petroleum gas (LPG or propane) if the supplier holds a license from the Wisconsin Department of

168

LIVING ON $2 A DAY ENERGY COMMITTEE HOLDS INAUGURAL ...  

Science Conference Proceedings (OSTI)

will focus on efforts to reduce energy consumption and environmental impact in ... the detailed strategic intelligence and analysis needed to make informed business decisions. Whether it is market outlooks, project feasibility, or investment strategy, ... Consultancy provide your firm with critical, timely information on petroleum...

169

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Cryogenics Show Cryogenics Show Length of time: 40-50 minutes Room preference: Gym or auditorium To help make a Cryogenics Show run smoothly, we ask the following: Make sure the presenter has exact directions to your school and any parking and delivery information. The Cryogenics Show should not be "directly" under any photo or ion type smoke detectors. The individual requesting the show is responsible for checking with the facility manager about the best location for the show. If the floor is not carpeted, everyone must be seated in chairs or bleachers. If you have scheduled multiple presentations, we request that we stay in the same room for all presentations. It is time consuming to move the set up from room to room. We would like 10-15 minutes between presentations if possible. Two presentations would be a maximum request.

170

NNSA, Rosatom, UK Ministry of Defence Hold Trilateral Nuclear Security Best  

National Nuclear Security Administration (NNSA)

Rosatom, UK Ministry of Defence Hold Trilateral Nuclear Security Best Rosatom, UK Ministry of Defence Hold Trilateral Nuclear Security Best Practices Workshop | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA, Rosatom, UK Ministry of Defence Hold ... Press Release NNSA, Rosatom, UK Ministry of Defence Hold Trilateral Nuclear Security Best

171

Secretary Bodman and Pakistan Officials Hold High-Level Energy Meeting |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Bodman and Pakistan Officials Hold High-Level Energy Secretary Bodman and Pakistan Officials Hold High-Level Energy Meeting Secretary Bodman and Pakistan Officials Hold High-Level Energy Meeting March 13, 2006 - 11:48am Addthis Discuss Pakistan's energy opportunities; Follows United States-Pakistan Strategic Partnership launched by President Bush earlier this month WASHINGTON, DC - Energy Secretary Samuel W. Bodman today visited Pakistan, the first stop in his four-nation swing where he will discuss ways that the U.S. and Pakistan can increase cooperation on energy-related issues. The Secretary's visit follows President Bush's pledge earlier this month to hold a high-level meeting between U.S. and Pakistani officials to collaborate on solutions to Pakistan's energy sources. "The U.S. and Pakistan are strong allies and America supports the people of

172

SeaPower Pacific subsidiary of Renewable Energy Holdings Plc Carnegie  

Open Energy Info (EERE)

SeaPower Pacific subsidiary of Renewable Energy Holdings Plc Carnegie SeaPower Pacific subsidiary of Renewable Energy Holdings Plc Carnegie Corporation Ltd Jump to: navigation, search Name SeaPower Pacific subsidiary of Renewable Energy Holdings Plc Carnegie Corporation Ltd Address 1 16 Ord Street PO Box 1902 Place West Perth Zip 6872 Sector Marine and Hydrokinetic Phone number 61 8 9486 4466 Website http://www.carnegiecorp.com.au Region Australia LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This company is listed in the Marine and Hydrokinetic Technology Database. This company is involved in the following MHK Projects: CETO Precommercial Pilot Project This article is a stub. You can help OpenEI by expanding it. Retrieved from "http://en.openei.org/w/index.php?title=SeaPower_Pacific_subsidiary_of_Renewable_Energy_Holdings_Plc_Carnegie_Corporation_Ltd&oldid=67845

173

NOON TODAY: Chu, Psaki to hold Conference Call on President Obama's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NOON TODAY: Chu, Psaki to hold Conference Call on President Obama's NOON TODAY: Chu, Psaki to hold Conference Call on President Obama's Upcoming Events NOON TODAY: Chu, Psaki to hold Conference Call on President Obama's Upcoming Events January 28, 2011 - 12:00am Addthis THE WHITE HOUSE Office of Media Affairs WASHINGTON, DC - Today, Friday, January 28 at noon ET, U.S. Energy Secretary Steven Chu and White House Deputy Director of Communications Jen Psaki will hold a conference call with media to preview President Obama's upcoming events next week, and to discuss the importance of investing in innovation and clean energy to put people back to work, grow the economy, and win the future. WHO: Department of Energy Secretary Steven Chu White House Deputy Director of Communications Jen Psaki WHAT: Conference call with media on the President's upcoming events and the importance of investing in innovation and clean energy

174

10:30AM TODAY: Senior Administration Officials to Hold a Background  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0:30AM TODAY: Senior Administration Officials to Hold a Background 0:30AM TODAY: Senior Administration Officials to Hold a Background Conference Call Regarding Oil 10:30AM TODAY: Senior Administration Officials to Hold a Background Conference Call Regarding Oil June 23, 2011 - 12:00am Addthis WASHINGTON, DC - Today, Thursday, June 23 at 10:30AM ET, Senior Administration Officials will hold a background conference call regarding the ongoing oil supply disruptions in the Middle East and North Africa and the announcement this morning to release oil from the Strategic Petroleum Reserve in coordination with the International Energy Agency. The call will be on background with no embargo. WHO: Senior Administration Officials WHAT: Background conference call WHEN: Thursday, June 23, 2011 10:30AM ET RSVP: Media who want to attend this call should dial (877) 941-1706 and ask to join the "White House call." No passcode is necessary.

175

Department of Energy Will Hold a Batteries and Energy Storage Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Will Hold a Batteries and Energy Storage Department of Energy Will Hold a Batteries and Energy Storage Information Meeting on October 21, 2011 Department of Energy Will Hold a Batteries and Energy Storage Information Meeting on October 21, 2011 October 2, 2011 - 11:46am Addthis On Friday, October 21, 2011 the Department of Energy will hold a public meeting from 8:00am to 5:00pm at the Bethesda North Marriott Hotel and Conference Center in Bethesda, MD to provide information and receive comments from the public on directions for a potential research effort on batteries and energy storage. Learn more about this meeting Registration Information Agenda Learn more about OE's Energy Storage program Addthis Related Articles Energy Department Seeks Public Comment on Standby Support Provisions of Energy Policy Act of 2005

176

Offset-free rail-to-rail derandomizing peak detect-and-hold circuit  

Science Conference Proceedings (OSTI)

A peak detect-and-hold circuit eliminates errors introduced by conventional amplifiers, such as common-mode rejection and input voltage offset. The circuit includes an amplifier, three switches, a transistor, and a capacitor. During a detect-and-hold phase, a hold voltage at a non-inverting in put terminal of the amplifier tracks an input voltage signal and when a peak is reached, the transistor is switched off, thereby storing a peak voltage in the capacitor. During a readout phase, the circuit functions as a unity gain buffer, in which the voltage stored in the capacitor is provided as an output voltage. The circuit is able to sense signals rail-to-rail and can readily be modified to sense positive, negative, or peak-to-peak voltages. Derandomization may be achieved by using a plurality of peak detect-and-hold circuits electrically connected in parallel.

DeGeronimo, Gianluigi (Nesconset, NY); O'Connor, Paul (Bellport, NY); Kandasamy, Anand (Coram, NY)

2003-01-01T23:59:59.000Z

177

Voltage holding study of 1 MeV accelerator for ITER neutral beam injectora)  

Science Conference Proceedings (OSTI)

Voltage holding test on MeV accelerator indicated that sustainable voltage was a half of that of ideal quasi-Rogowski electrode. It was suggested that the emission of the clumps is enhanced by a local electric field concentration

M. Taniguchi; M. Kashiwagi; N. Umeda; M. Dairaku; J. Takemoto; H. Tobari; K. Tsuchida; H. Yamanaka; K. Watanabe; A. Kojima; M. Hanada; K. Sakamoto; T. Inoue

2012-01-01T23:59:59.000Z

178

Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Future to Hold First Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting March 3, 2010 - 12:00am Addthis Washington, D.C. - On Thursday, March 25th and Friday, March 26th, the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its first meeting in Washington, D.C. At the direction of President Obama, Secretary of Energy Steven Chu established the Blue Ribbon Commission to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and to provide recommendations for developing a safe, long-term solution to managing the Nation's used nuclear fuel and nuclear waste.

179

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Charge! Electricity And Magnetism Charge! Electricity And Magnetism Length of time: 40-55 minutes Room preference: Single or double classroom or all-purpose room. (Make plans by e-mail directly with your volunteer presenter.) To help make a Charge! presentation run smoothly, we ask the following: Make sure the scientist has exact directions to your school and any parking and delivery information. Please review basic concepts with the students before the presentation. They will understand more if they have these concepts fresh in mind. The classroom presentations are intended to enhance your classroom curriculum. This presentation is designed for students in 2nd-8th grades. Please let the scientists know of any specific related learning objectives you wish to address. The presentation is intended for one or two classes. It is most

180

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Physics of Sports Physics of Sports Length of time: 45-60 minutes Room preference: Gymnasium, Auditorium or All-purpose room. Since this presentation utilizes sports equipment and student volunteers, a room that is large enough for some sports related activity and a hard surface floor is best. (Make plans by e-mail directly with your volunteer presenter.) To help make a Physics of Sports presentation run smoothly, we ask the following: Make sure the scientist has exact directions to your school and any parking and delivery information. Please review basic concepts with the students before the presentation. They will understand more if they have these concepts fresh in mind. The classroom presentations are intended to enhance your classroom curriculum. This presentation is designed for students in 4th-12th grades.

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Particle Adventure | What holds it together? | Residual EM force  

NLE Websites -- All DOE Office Websites (Extended Search)

EM force EM force Residual EM force Atoms usually have the same numbers of protons and electrons. They are electrically neutral, therefore, because the positive protons cancel out the negative electrons. Since they are neutral, what causes them to stick together to form stable molecules? The answer is a bit strange: we've discovered that the charged parts of one atom can interact with the charged parts of another atom. This allows different atoms to bind together, an effect called the residual electromagnetic force. So the electromagnetic force is what allows atoms to bond and form molecules, allowing the world to stay together and create the matter you interact with all of the time. Amazing, isn't it? All the structures of the world exist simply because protons and electrons have opposite charges!

182

Modeling the Solar Cycle: What the Future Holds  

E-Print Network (OSTI)

Stellar magnetic fields are produced by a magnetohydrodynamic dynamo mechanism working in their interior -- which relies on the interaction between plasma flows and magnetic fields. The Sun, being a well-observed star, offers an unique opportunity to test theoretical ideas and models of stellar magnetic field generation. Solar magnetic fields produce sunspots, whose number increases and decreases with a 11 year periodicity -- giving rise to what is known as the solar cycle. Dynamo models of the solar cycle seek to understand its origin, variation and evolution with time. In this review, I summarize observations of the solar cycle and describe theoretical ideas and dynamo modeling efforts to address its origin. I end with a discussion on the future of solar cycle modeling -- emphasizing the importance of a close synergy between observational data assimilation, kinematic dynamo models and full magnetohydrodynamic models of the solar interior.

Nandy, Dibyendu

2011-01-01T23:59:59.000Z

183

ASHTABULA SUCCESSES--MACRO NOW OR FOREVER HOLD YOUR PIECES!  

Science Conference Proceedings (OSTI)

As facility demolition and remediation continued at the DOE Ashtabula Environmental Management Project (AEMP), a DOE closure site located in Ashtabula, OH, the quantity of mixed waste increased by approximately twenty-fold from the original Site Treatment Plan estimates to over 567 m3 (20,000 cubic feet). Also, a greater variety of low-level mixed waste (MW) was identified that was suitable for alternate debris treatment like macroencapsulation (MACRO) instead of traditional shredding, stabilization, and solidification to improve the overall safety and cost-effectiveness. Macroencapsulation is required for lead and authorized for hazardous debris under the alternate debris treatment standards per 40 CFR 268.45. Several polymer encapsulation processes were being explored, developed, and deployed in the mid-1990's by various groups including the DOE Mixed Waste Focus Area, DOE EM-50 Office of Science and Technology, Brookhaven National Laboratory, DOE Macro Working Group, DOE-Albuquerque Mixed Waste/Mobile Treatment Unit, and Envirocare of Utah, Inc. As a result, technically-proven macroencapsulation and microencapsulation processes using extruded polyethylene beads were verified as being technically acceptable for waste treatment to RCRA standards. The AEMP had a variety of waste forms where technically-proven systems were needed to perform on-site treatment of challenging mixed wastes (MW) from production operations (i.e. HEPA filters, barium salt contaminated steel) containing high concentrations of enriched uranium, graphite, salts, and RCRA metals. The AEMP continued with a technology development and deployment process to license, permit, install, and safely operate two proven polymer encapsulation systems for both RCRA microencapsulation and RCRA macroencapsulation using surplus DOE equipment from Rocky Flats to establish cost-effective mobile treatment capability. The AEMP treated approximately 16 m3 (= 579 cf) of challenging mixed wastes onsite at approximately 50 wt% waste loading using polymer microencapsulation and macroencapsulation systems to isolate the hazards from the general public. These wastes were then profiled and buried in fifty-seven (57) containers containing approximately 33 m3 (1,194 cf) of LDR-compliant wastes at NTS and Envirocare of Utah, Inc. However, this paper summarizes only the MACRO technology approval, waste inspection/treatment/certification process, and technology transfer as deployed at AEMP and Sandia National Laboratories (SNL). It describes only the sequences associated with optimizing the process for the polymer MACRO system to meet overall DOE waste management needs. AEMP performed MACRO on 4 m3 (139 cf) of RCRA debris before the system was shut down. The shut down occurred due to new project direction, funding availability, and alternate offsite treatment capabilities at TSCAI and/or commercial facilities for the balance of the mixed wastes.

Altmayer, S.A.; Forschner, J.A.; Kulpa, J. P.; Spoerner, M.T.

2003-02-27T23:59:59.000Z

184

The Particle Adventure | What holds it together? | Electroweak  

NLE Websites -- All DOE Office Websites (Extended Search)

Electroweak Electroweak Electroweak In the Standard Model the weak and the electromagnetic interactions have been combined into a unified electroweak theory. Physicists had long believed that weak forces were closely related to electromagnetic forces. Eventually they discovered that at very short distances (about 10-18 meters) the strength of the weak interaction is comparable to that of the electromagnetic. On the other hand, at thirty times that distance (3x10-17 m) the strength of the weak interaction is 1/10,000th than that of the electromagnetic interaction. At distances typical for quarks in a proton or neutron (10-15 m) the force is even tinier. Physicists concluded that, in fact, the weak and electromagnetic forces have essentially equal strengths. This is because the strength of the interaction depends strongly on both the mass of the force carrier and the distance of the interaction. The difference between their observed strengths is due to the huge difference in mass between the W and Z particles, which are very massive, and the photon, which has no mass as far as we know

185

New York Marcellus Shale: Industry boom put on hold  

Science Conference Proceedings (OSTI)

Key catalysts for Marcellus Shale drilling in New York were identified. New York remains the only state in the nation with a legislative moratorium on high-volume hydraulic fracturing, as regulators and state lawmakers work to balance the advantages of potential economic benefits while protecting public drinking water resources and the environment. New York is being particularly careful to work on implementing sufficiently strict regulations to mitigate the environmental impacts Pennsylvania has already seen, such as methane gas releases, fracturing fluid releases, flowback water and brine controls, and total dissolved solids discharges. In addition to economic and environmental lessons learned, the New York Department of Environmental Conservation (DEC) also acknowledges impacts to housing markets, security, and other local issues, and may impose stringent measures to mitigate potential risks to local communities. Despite the moratorium, New York has the opportunity to take advantage of increased capital investment, tax revenue generation, and job creation opportunities by increasing shale gas activity. The combination of economic benefits, industry pressure, and recent technological advances will drive the pursuit of natural gas drilling in New York. We identify four principal catalysts as follows: Catalyst 1: Pressure from Within the State. Although high-volume hydraulic fracturing has become a nationally controversial technology, shale fracturing activity is common in every U.S. state except New York. The regulatory process has delayed potential economic opportunities for state and local economies, as well as many industry stakeholders. In 2010, shale gas production accounted for $18.6 billion in federal royalty and local, state, and federal tax revenues. (1) This is expected to continue to grow substantially. The DEC is under increased pressure to open the state to the same opportunities that Alabama, Arkansas, California, Colorado, Kansas, Louisiana, Montana, New Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Texas, Utah, West Virginia, and Wyoming are pursuing. Positive labor market impacts are another major economic draw. According to the Revised Draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program (September 2011), hydraulic fracturing would create between 4,408 and 17,634 full-time equivalent (FTE) direct construction jobs in New York State. Indirect employment in other sectors would add an additional 29,174 FTE jobs. Furthermore, the SGEIS analysis suggests that drilling activities could add an estimated $621.9 million to $2.5 billion in employee earnings (direct and indirect) per year, depending upon how much of the shale is developed. The state would also receive direct tax receipts from leasing land, and has the potential to see an increase in generated indirect revenue. Estimates range from $31 million to $125 million per year in personal income tax receipts, and local governments would benefit from revenue sharing. Some landowner groups say the continued delay in drilling is costing tens of thousands of jobs and millions of dollars in growth for New York, especially in the economically stunted upstate. A number of New York counties near Pennsylvania, such as Chemung, NY, have experienced economic uptick from Pennsylvania drilling activity just across the border. Chemung officials reported that approximately 1,300 county residents are currently employed by the drilling industry in Pennsylvania. The Marcellus shale boom is expected to continue over the next decade and beyond. By 2015, gas drilling activity could bring 20,000 jobs to New York State alone. Other states, such as Pennsylvania and West Virginia, are also expected to see a significant increase in the number of jobs. Catalyst 2: Political Reality of the Moratorium. Oil and gas drilling has taken place in New York since the 19th century, and it remains an important industry with more than 13,000 currently active wells. The use of hydraulic fracturing in particular has been employed for decades. Yet, as technological

Mercurio, Angelique

2012-01-16T23:59:59.000Z

186

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

187

Practical reporting times for environmental samples  

Science Conference Proceedings (OSTI)

Preanalytical holding times for environmental samples are specified because chemical and physical characteristics may change between sampling and chemical analysis. For example, the Federal Register prescribes a preanalytical holding time of 14 days for volatile organic compounds in soil stored at 4{degrees}C. The American Society for Testing Materials (ASTM) uses a more technical definition that the preanalytical holding time is the day when the analyte concentration for an environmental sample falls below the lower 99% confidence interval on the analyte concentration at day zero. This study reviews various holding time definitions and suggest a new preanalytical holding time approach using acceptable error rates for measuring an environmental analyte. This practical reporting time (PRT) approach has been applied to nineteen volatile organic compounds and four explosives in three environmental soil samples. A PRT nomograph of error rates has been developed to estimate the consequences of missing a preanalytical holding time. This nomograph can be applied to a large class of analytes with concentrations that decay linearly or exponentially with time regardless of sample matrices and storage conditions.

Bayne, C.K.; Schmoyer, D.D.; Jenkins, R.A.

1993-02-01T23:59:59.000Z

188

Letter from Pepco Holdings Regarding the Reliability of Electric Service in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Pepco Holdings Regarding the Reliability of Electric from Pepco Holdings Regarding the Reliability of Electric Service in the District of Columbia Letter from Pepco Holdings Regarding the Reliability of Electric Service in the District of Columbia Docket No. EO-05-01: I am writing to alert you to our concerns regarding the reliability of electricity service for the Nation's Capital in light of the recent shutdown of the Potomac River Generating Station in Alexandria, Virginia. The plant shutdown has removed a redundancy which is critical to assuring the reliable supply of electricity. Accordingly, we believe that immediate resumption of plant operations, in a manner that balances environmental and electricity reliability concerns, is critical to ensuring reliable electric service to the Nation's Capital.

189

A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion  

NLE Websites -- All DOE Office Websites (Extended Search)

A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion Plasmas Fusion Energy Sciences (FES) FES Home About Research Facilities Science Highlights Benefits of FES Funding Opportunities Fusion Energy Sciences Advisory Committee (FESAC) News & Resources Contact Information Fusion Energy Sciences U.S. Department of Energy SC-24/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4941 F: (301) 903-8584 E: sc.fes@science.doe.gov More Information » October 2012 A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion Plasmas Recent experiments have confirmed the great potential of a novel plasma-material interface concept. Print Text Size: A A A Subscribe FeedbackShare Page Click to enlarge photo. Enlarge Photo

190

U.S. and India Hold the Second Meeting of the Indo-United States Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

India Hold the Second Meeting of the Indo-United States India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group April 30, 2009 - 12:00am Addthis The United States hosted the second meeting of the U.S.-India Civil Nuclear Energy Working Group at Idaho National Laboratory on April 28-30, 2009. This was the first meeting held by the Working Group since entry into force of the U.S.-India peaceful nuclear cooperation agreement. The agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies, help India meet its rapidly increasing energy needs in an environmentally responsible way, and enhance global nonproliferation efforts by bringing India closer to the nonproliferation

191

Energy Secretary Chu and HUD Secretary Donovan to Hold Press Conference in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and HUD Secretary Donovan to Hold Press and HUD Secretary Donovan to Hold Press Conference in Bohemia to Unveil New FHA Powersaver Program Energy Secretary Chu and HUD Secretary Donovan to Hold Press Conference in Bohemia to Unveil New FHA Powersaver Program April 20, 2011 - 12:00am Addthis WASHINGTON, DC - THURSDAY, April 21st, U.S. Department of Energy Secretary Steven Chu and U.S. Housing and Urban Development Secretary Shaun Donovan will host a press conference at Energy Testing Services in Bohemia, Long Island to unveil a new pilot program that will offer credit-worthy borrowers low-cost loans to make energy-saving improvements to their homes. Congressman Steve Israel will also join the event. WHAT: Press conference to unveil new HUD pilot program WHO: U.S. Energy Secretary Steven Chu U.S. Housing and Urban Development Secretary Shaun Donovan

192

TODAY: Secretary Chu and GM to Hold Conference Call with Virginia Tech |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TODAY: Secretary Chu and GM to Hold Conference Call with Virginia TODAY: Secretary Chu and GM to Hold Conference Call with Virginia Tech TODAY: Secretary Chu and GM to Hold Conference Call with Virginia Tech June 17, 2011 - 12:00am Addthis Washington, D.C. - Today, Energy Secretary Steven Chu will join Kent Helfrich, Executive Director of electronic controls and software at General Motors (GM), on a conference call to congratulate Virginia Tech as the overall winners of EcoCAR: The NeXt Challenge. Students from Virginia Tech will join the call to discuss the real world experience they gained in the program and the winning fuel-efficient vehicle they designed and built. Sixteen schools competed in the EcoCAR: The NeXt Challenge, a three-year collegiate student engineering competition - sponsored by the Department of Energy and GM - that focuses on advanced vehicle technologies that minimize

193

Jiangsu Linyang Solarfun Co Ltd aka Solarfun Power Holdings | Open Energy  

Open Energy Info (EERE)

Linyang Solarfun Co Ltd aka Solarfun Power Holdings Linyang Solarfun Co Ltd aka Solarfun Power Holdings Jump to: navigation, search Name Jiangsu Linyang Solarfun Co Ltd (aka Solarfun Power Holdings) Place Qidong, Jiangsu Province, China Zip 226200 Product Chinese manufacturer of mono and multicrystalline PV cells and modules. Coordinates 31.811399°, 121.667503° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.811399,"lon":121.667503,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

194

U.S. and India hold the Third Meeting of the Indo-United States Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and India hold the Third Meeting of the Indo-United States and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India hold the Third Meeting of the Indo-United States Civil Nuclear Energy Working Group March 17, 2010 - 12:54pm Addthis India hosted the third meeting of the Indo-United States Civil Nuclear Energy Working Group in Mumbai, on Feb. 3-4, 2010. Civil nuclear is one of five working groups established under the Energy Dialogue as a result of the 2005 Joint Statement issued by then President Bush and Prime Minister Singh. The Working Group first met in 2006 and held its second meeting after the U.S. and Indian governments completed the Indo-U.S. Civil Nuclear Cooperation Agreement. The Agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies; to

195

CAM operated tool for proximate or remote holding of an object  

DOE Patents (OSTI)

A tool for releasably holding an object includes a receptacle having an outer sleeve and a rotatable inner sleeve. The inner sleeve is coaxially positioned within the outer sleeve and includes a locking member. An insert which is adapted to be operably associated with the receptacle includes a cam. The cam includes a guide and a slot so that when the cam is inserted into the inner sleeve, the guide aligns the locking member with the slot allowing the locking member to engage the slot thereby holding the receptacle and the insert together.

Schrum, P.B.; Gajdzik, G.P. Jr.

1995-12-31T23:59:59.000Z

196

THE CSP DICHOTOMY HOLDS FOR DIGRAPHS WITH NO SOURCES AND NO SINKS  

E-Print Network (OSTI)

THE CSP DICHOTOMY HOLDS FOR DIGRAPHS WITH NO SOURCES AND NO SINKS (A POSITIVE ANSWER conjectured in 1990 (using the language of graph homomorphisms) a CSP dichotomy for digraphs with no sources hered- itarily hard digraphs. Further, we show that the CSP dichotomy for digraphs with no sources

Barto, Libor

197

Sensitivity of the Global Water Cycle to the Water-Holding Capacity of Land  

Science Conference Proceedings (OSTI)

The sensitivity of the global water cycle to the water-holding capacity of the plant-root zone of continental soils is estimated by simulations using a mathematical model of the general circulation of the atmosphere, with prescribed ocean surface ...

P. C. D. Milly; K. A. Dunne

1994-04-01T23:59:59.000Z

198

Remix and play: lessons from rule variants in texas hold'em and halo 2  

Science Conference Proceedings (OSTI)

Players can change the rules of a multi-person game to experience a different gameplay mechanic, add thematic color, or fine-tune its balance. To better understand game variants, we use a grounded approach to analyze 62 variants for Texas Hold'em, a ... Keywords: customization, game design, halo, honor rules, poker, variants

Gifford Cheung; Jeff Huang

2012-02-01T23:59:59.000Z

199

Top UN officials call on hold-out States to ratify treaty banning nuclear tests  

E-Print Network (OSTI)

Top UN officials call on hold-out States to ratify treaty banning nuclear tests 29 August 2011 in Kurchatov, Kazakhstan. (June 2010) 29 August 2011 ­ Warning that voluntary moratoriums on nuclear weapon War, hundreds of nuclear weapon tests left behind a devastating legacy for local citizens

200

A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion  

NLE Websites -- All DOE Office Websites (Extended Search)

A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion A Snowflake-Shaped Magnetic Field Holds Promise for Taming Harsh Fusion Plasmas Recent experiments have confirmed the great potential of a novel plasma-material interface concept. By U.S Department of Energy Office of Science October 31, 2012 Tweet Widget Facebook Like Google Plus One National Spherical Torus Experiment (Photo by Elle Starkman, Office of Communications, PPPL) National Spherical Torus Experiment The Science Heat escaping from the core of a twelve-million degree nuclear fusion plasma device was successfully contained by a snowflake-shaped magnetic field to mitigate its impact on device walls. The Impact One of the grand challenges of the magnetic fusion research is to "tame the plasma-material interface"-to develop an interface between the hot

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

How to create formatted blocks to hold OpenEI wiki content | OpenEI  

Open Energy Info (EERE)

How to create formatted blocks to hold OpenEI wiki content How to create formatted blocks to hold OpenEI wiki content Home > Groups > OpenEI Community Central Rmckeel's picture Submitted by Rmckeel(297) Contributor 25 June, 2013 - 07:39 content formatting user interface wiki The OpenEI wiki frontpage uses "boxes" that help organize content. These boxes are frequently re-used across the site. While there is an easy way of doing this - the FlexiBlock template - the frontpage was just now converted to using that format. The FlexiBlock format is a more elegant and less error-prone way to use the frontpage block formats, rather than creating nested divs. It also ensures we can update the format of the boxes sitewide easily if we ever need to (and we probably will). If you or someone you know is using the frontpage blocks, please switch to

202

NREL: Wind Research - NREL Analysis Enables BOEM to Hold Its First  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Enables BOEM to Hold Its First Commercial Offshore Lease Sale Analysis Enables BOEM to Hold Its First Commercial Offshore Lease Sale in the United States December 2, 2013 Photo showing three 5-megawatt wind turbines installed above the water at the Alpha Ventus Offshore Wind Farm in Germany. A boat is moving forward to the left of the turbines. REpower 5-megawatt wind turbines at the Alpha Ventus Offshore Wind Farm in Germany demonstrate the possibilities for offshore wind on a grand scale-and now new offshore wind opportunities are coming to the United States. Photo by Gary Norton, NREL 27363 When the U.S. Department of the Interior's Bureau of Ocean Energy Management (BOEM) needed a process to delineate the bureau's proposed offshore Wind Energy Areas (WEAs) into auctionable leasing areas, the agency turned to the National Renewable Energy Laboratory (NREL). Under an

203

The Death of a Massive Star Holds Key to Early Universe | U.S. DOE Office  

Office of Science (SC) Website

The Death of The Death of a Massive Star Holds Key to Early Universe News Featured Articles 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Headlines Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.16.09 The Death of a Massive Star Holds Key to Early Universe Scientists found the remains of a massive star, providing them with new information to reassess the environment of the early Universe. Print Text Size: A A A Subscribe FeedbackShare Page Imagine if paleontologists found the fossilized remains of a long-hypothesized, but never discovered dinosaur deep in the Amazon rainforest. Well, physicists participating in the international Supernova Factory, a Department of Energy sponsored project at Lawrence Berkeley

204

Argonne CNM News: New inorganic semiconductor layers hold promise for solar  

NLE Websites -- All DOE Office Websites (Extended Search)

New inorganic semiconductor layers hold promise for solar energy New inorganic semiconductor layers hold promise for solar energy Inorganic surface ligands Inorganic surface ligands enable facile electron transport between quantum dots and opened novel opportunities for using nanostructures in solar cells. Inorganic dot array Arrays of quantum dots allow fabrication of solar cells by printing and other inexpensive techniques. A team of users from the University of Chicago, working with the NanoBio Interfaces Group, has demonstrated a method that could produce cheaper semiconductor layers for solar cells. The inorganic nanocrystal arrays, created by spraying a new type of colloidal "ink," have excellent electron mobility and could be a step toward addressing fundamental problems with current solar technology.

205

Search for Publications Related to ORNL DAAC Holdings, September 8, 2003  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Related to ORNL DAAC Holdings Publications Related to ORNL DAAC Holdings The ORNL DAAC has expanded its searchable bibliographic database so that users can locate publications related to a wide range of data sets in its archive. Projects such as FLUXNET, BOREAS, BOREAS Follow-On, SAFARI 2000, LBA, Net Primary Productivity, and VEMAP are represented, along with Climate, Soil, and Vegetation collections, among others. The database contains bibliographic entries for more than 7200 publications that are directly or indirectly related to specific research projects and their general topics. It includes entries for publications that users have sent to the ORNL DAAC. Users can search for entries project by project, or they can search the entire series of projects at once. To access the bibliographic database, look for "Bibliographic Search" under

206

EECH Group AG formerly European Energy Consult Holding P T Technology AG |  

Open Energy Info (EERE)

EECH Group AG formerly European Energy Consult Holding P T Technology AG EECH Group AG formerly European Energy Consult Holding P T Technology AG Jump to: navigation, search Name EECH Group AG (formerly European Energy Consult Holding, P&T Technology AG) Place Hamburg, Schleswig-Holstein, Germany Zip 20354 Sector Solar, Wind energy Product Manager of retail bond issues to fund wind, PV and solar thermal power projects. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

207

SOLVENT HOLD TANK SAMPLE RESULTS FOR MCU-11-314, MCU-11-315, MCU-11-316, MCU-11-317, MCU-11-318 AND MCU-11-319  

SciTech Connect

Savannah River National Laboratory (SRNL) analyzed solvent samples from Modular Caustic-Side Solvent Extraction Unit (MCU) in support of continuing operations. A quarterly analysis of the solvent is required to maintain solvent composition within specifications. Analytical results of the analyses of Solvent Hold Tank (SHT) samples MCU-11-314, MCU-11-315, MCU-11-316, MCU-11-317, MCU-11-318 and MCU-11-319 are reported. The results show that the solvent at MCU does not require an Isopar{reg_sign} L addition, but it will require addition of trioctylamine. Cesium mass transfer testing with the solvent matches expected extraction behavior but shows a slightly lower stripping efficiency than seen in the original process demonstration for Macrobatch 3. The entrained aqueous solution indicates the scrub wash is significantly out of specification. As a result, the facility replaced the scrub wash. Unlike the previous solvent sample results, these analyses indicate that the solvent does not require minor Isopar{reg_sign} L trimming at this time. However, addition of TOA is warranted. These findings indicate that the new protocols for solvent monitoring and control are yielding favorable results. Nevertheless, the deviation in the TOA concentration since the last analysis indicates continued periodic (i.e., quarterly) monitoring is recommended. The {sup 137}Cs mass transfer results from the solvent sample testing show possible evidence of slightly reduced stripping efficiency. An evaluation (using a model) of expected system performance for MCU using the measured distribution values predicts an {approx}50% decline in DFs given the ESS test results. The customer should consider pulling a SHT sample for reanalysis.

Peters, T.; Washington, A.; Fondeur, F.; Fink, S.

2011-06-09T23:59:59.000Z

208

SOLVENT HOLD TANK SAMPLE RESULTS FOR MCU-13-1403/1404/1405/1406/1407/1408: QUARTERLY SAMPLE FROM SEPTEMBER 2013  

SciTech Connect

Savannah River National Laboratory (SRNL) analyzed solvent samples from the Modular Caustic-Side Solvent Extraction Unit (MCU) in support of continuing operations. A quarterly analysis of the solvent is required to maintain solvent composition within specifications. Analytical results of the analyses of Solvent Hold Tank (SHT) samples MCU-13-1403, MCU-13-1404, MCU-13-1405, MCU-13-1406, MCU-13-1407, and MCU-13-1408 received on September 17, 2013 are reported. This sample was taken after the addition of the Next Generation Solvent (NGS) cocktail to produce a NGS-MCU blended solvent. The results show that the solvent contains a slight excess of Isopar? L and a deficit concentration of modifier and TiDG when compared to the target composition. Addition of TiDG trim is recommended. SRNL also analyzed the SHT sample for {sup 137}Cs content and determined the measured value is within tolerance and that the value has returned to levels observed in 2011. In contrast to what was observed in the heel prior to adding the NGS cocktail, no organic impurities were detected in these solvent samples.

Fondeur, F.; Taylor-Pashow, K.

2013-11-20T23:59:59.000Z

209

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

210

Estimates of fire environments in ship holds containing radioactive material packages  

SciTech Connect

Fire environments that occur on cargo ships differ significantly from the fire environments found in land transport. Cargo ships typically carry a large amount of flammable fuel for propulsion and shipboard power, and may transport large quantities of flammable cargo. As a result, sea mode transport accident records contain instances of long lasting and intense fires. Since Irradiated Nuclear Fuel (INF) casks are not carried on tankers with large flammable cargoes, most of these dramatic, long burning fires are not relevant threats, and transport studies must concentrate on those fires that are most likely to occur. By regulation, INF casks must be separated from flammable cargoes by a fire-resistant, liquid-tight partition. This makes a fire in an adjacent ship hold the most likely fire threat. The large size of a cargo ship relative to any spent nuclear fuel casks on board, however, may permit a severe, long lasting fire to occur with little or no thermal impact on the casks. Although some flammable materials such as shipping boxes or container floors may exist in the same hold with the cask, the amount of fuel available may not provide a significant threat to the massive transport casks used for radioactive materials. This shipboard fire situation differs significantly from the regulatory conditions specified in 10 CFR 71 for a fully engulfing pool fire. To learn more about the differences, a series of simple thermal analyses has been completed to estimate cask behavior in likely marine and land thermal accident situations. While the calculations are based on several conservative assumptions, and are only preliminary, they illustrate that casks are likely to heat much more slowly in shipboard hold fires than in an open pool fire. The calculations also reinforce the basic regulatory concept that for radioactive materials, the shipping cask, not the ship, is the primary protection barrier to consider.

Koski, J.A.; Cole, J.K.; Hohnstreiter, G.F. [Sandia National Labs., Albuquerque, NM (United States); Wix, S.D. [GRAM, Inc., Albuquerque, NM (United States)

1995-12-31T23:59:59.000Z

211

Please Hold Me UP: Why Firms Grant Exclusive-Dealing Contracts  

E-Print Network (OSTI)

Why do irreplaceable firms with a choice of suppliers or customers deliberately expose themselves to the threat of hold up by contracting ex ante to deal with only one of them? Our explanation revolves around the multiple equilibria intrinsic to situations of unverifiable investment and many traders. Exclusive dealing eliminates inecient equilibria in which too many firms invest too little. The enhanced ex post bargaining power of the chosen rm is beneficial for incentives whilst the distributional impact is more than oset in the ex ante negotiations over which this firm obtains the access privelege.

David de Meza; Marianno Selvaggi

2003-01-01T23:59:59.000Z

212

NNSA PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION  

NLE Websites -- All DOE Office Websites (Extended Search)

PERSONNEL SECURITY PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION Contractor Federal Name (Last, First, Middle): Suffix: Date of Birth: Social Security Number: Place of Birth (city and state/country): Citizenship(s): Email Address: Employer (legal name): Job Title: Required: LOCATION/BILLING Work Location: Contracting Office Location/SON: Prime Contract Number: Sub-contract Number: Facility Code: Employer Code: Required: CLEARANCE ACTION Requested Action(s): Clearance Level: (for employer/contract above) Clearance History Never held a clearance Previously held Currently holds Key Management Personnel (KMP)? Human Reliability Program (HRP)? PERSONNEL SECURITY USE ONLY: DOE Clearance: Special Access Program (SAP)? Yes No CLEARANCE JUSTIFICATION NARRATIVE

213

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

214

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

215

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

216

U.S. and India Hold the Second Meeting of the Indo-United States Civil  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. and India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group U.S. and India Hold the Second Meeting of the Indo-United States Civil Nuclear Energy Working Group The United States hosted the second meeting of the U.S.-India Civil Nuclear Energy Working Group at Idaho National Laboratory on April 28-30, 2009. This was the first meeting held by the Working Group since entry into force of the U.S.-India peaceful nuclear cooperation agreement. The agreement, signed in October 2008, aims to provide new opportunities for trade and job creation for both economies, help India meet its rapidly increasing energy needs in an environmentally responsible way, and enhance global nonproliferation efforts by bringing India closer to the nonproliferation mainstream. With completion of the peaceful nuclear cooperation agreement, both governments are now working to reinvigorate technical discussions begun under the Working Group in 2006. Mr. Shane Johnson, Acting Assistant Secretary for Nuclear Energy in the U.S. Department of Energy, and Dr. Ravi Grover, Director of India�s Strategic & Planning Group in the Department of Atomic Energy, served as co-chairs of the meeting. They opened the dialogue by reaffirming their commitment to work collaboratively to face global economic, climate change, and energy security challenges.

217

Influence of the Realistic Description of Soil Water-Holding Capacity on the Global Water Cycle in a GCM  

Science Conference Proceedings (OSTI)

The sensitivity of the hydrological cycle to soil water-holding capacity (WHC) is investigated using the Laboratoire de Meteorologie Dynamique General Circulation Model (LMD GCM) coupled to a land surface model (LSM). A reference simulation (REF),...

Agns Ducharne; Katia Laval

2000-12-01T23:59:59.000Z

218

Tornado Warnings, Lead Times, and Tornado Casualties: An Empirical Investigation  

Science Conference Proceedings (OSTI)

Conventional wisdom holds that improved tornado warnings will reduce tornado casualties, because longer lead times on warnings provide extra opportunities to alert residents who can then take precautions. The relationship between warnings and ...

Kevin M. Simmons; Daniel Sutter

2008-04-01T23:59:59.000Z

219

CHARACTERIZATION AND EVALUATION OF CAUSTIC WASH TANK AND SOLVENT HOLD TANK SAMPLES FROM MCU FROM AUGUST TO SEPTEMBER 2011  

SciTech Connect

During processing of Salt Batches 3 and 4 in the Modular Caustic-Side Solvent Extraction Unit (MCU), the decontamination efficiency for cesium declined from historical values and from expectations based on laboratory testing. This report documents efforts to analyze samples of solvent and process solutions from MCU in an attempt to understand the cause of the reduced performance and to recommend mitigations. CWT Solutions from MCU from the time period of variable decontamination factor (DF) performance which covers from April 2011 to September 2011 (during processing of Salt Batch 4) were examined for impurities using chromatography and spectroscopy. The results indicate that impurities were found to be of two types: aromatic containing impurities most likely from Modifier degradation and aliphatic type impurities most likely from Isopar{reg_sign} L and tri-n-octylamine (TOA) degradation. Caustic washing the Solvent Hold Tank (SHT) solution with 1M NaOH improved its extraction ability as determined from {sup 22}Na uptake tests. Evidence from this work showed that pH variance in the aqueous solutions within the range of 1M nitric acid to 1.91M NaOH that contacted the solvent samples does not influence the analytical determination of the TOA concentration by GC-MS.

Fondeur, F.; Fink, S.

2012-08-01T23:59:59.000Z

220

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

222

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

223

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

224

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

225

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

226

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

227

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

228

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

229

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

230

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

231

ESnet Requirements Workshops  

NLE Websites -- All DOE Office Websites (Extended Search)

health monitoring, etc will place new demands on networks * Multi-site near-real-time or real-time network interaction * Need expressed by multiple science communities...

232

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

233

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

234

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

235

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

236

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

237

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

238

Underwater robots require adequate guidance and control to perform useful tasks. Visual  

E-Print Network (OSTI)

Abstract Underwater robots require adequate guidance and control to perform useful tasks. Visual trained by reinforcement learn- ing our aim is to enable an underwater robot to hold station on a reef technologies for underwater exploration and obser- vation. Our objectives are to enable underwater robots

239

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

240

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Clinical Results of Image-Guided Deep Inspiration Breath Hold Breast Irradiation  

SciTech Connect

Purpose: To evaluate the feasibility, cardiac dose reduction, and the influence of the setup error on the delivered dose for fluoroscopy-guided deep inspiration breath hold (DIBH) irradiation using a cone-beam CT for irradiation of left-sided breast cancer patients. Methods and Materials: Nineteen patients treated according to the DIBH protocol were evaluated regarding dose to the ipsilateral breast (or thoracic wall), heart, (left ventricle [LV]and left anterior descending artery [LAD]), and lung. The DIBH treatment plan was compared to the free-breathing (FB) treatment planning and to the dose data in which setup error was taken into account (i.e., actual delivered dose). Results: The largest setup variability was observed in the direction perpendicular to the RT field ({mu} = -0.8 mm, {Sigma} = 2.9 mm, {sigma} = 2.0 mm). The mean (D{sub mean}) and maximum (D{sub max}) doses of the DIBH treatment plan was significantly lower compared with the FB treatment plan for the heart (34% and 25%, p < 0.001), LV (71% and 28%, p < 0.001), and LAD (52% and 39.8%, p < 0.001). For some patients, large differences were observed between the heart D{sub max} according to the DIBH treatment plan and the actual delivered dose (up to 71%), although D{sub max} was always smaller than the planned FB dose (mean group reduction = 29%, p < 0.001). Conclusion: The image-guided DIBH treatment protocol is a feasible irradiation method with small setup variability that significantly reduces the dose to the heart, LV, and LAD.

Borst, Gerben R.; Sonke, Jan-Jakob; Hollander, Suzanne den; Betgen, Anja; Remeijer, Peter; Giersbergen, Aline van; Russell, Nicola S.; Elkhuizen, Paula H.M.; Bartelink, Harry [Department of Radiation Oncology, The Netherlands Cancer Institute-Antoni van Leeuwenhoek Hospital, Amsterdam (Netherlands); Vliet-Vroegindeweij, Corine van, E-mail: C.v.vliet@nki.n [Department of Radiation Oncology, The Netherlands Cancer Institute-Antoni van Leeuwenhoek Hospital, Amsterdam (Netherlands)

2010-12-01T23:59:59.000Z

242

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

243

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

244

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

245

Accidental Activists: How Victim Groups Hold the Government Accountable in Japan and South Korea  

E-Print Network (OSTI)

2067. Yokota, Sakie. North Korea Kidnapped My Daughter. NewShimbun Yomiuri Shimbun Sankei Shimbun Japan Times KoreaTimes Korea Herald JoongAng Ilbo Chosun Ilbo Dong-A Ilbo

Arrington, Celeste Louise

2010-01-01T23:59:59.000Z

246

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement The owner or operator of a diesel powered vehicle must limit the length of time their vehicle remains idle. The limit is based on the outside

247

Cardiac Motion During Deep-Inspiration Breath-Hold: Implications for Breast Cancer Radiotherapy  

SciTech Connect

Purpose: Many patients with left-sided breast cancer receive adjuvant radiotherapy during deep-inspiration breath hold (DIBH) to minimize radiation exposure to the heart. We measured the displacement of the left anterior descending artery (LAD) and heart owing to cardiac motion during DIBH, relative to the standard tangential fields for left breast cancer radiotherapy. Methods and Materials: A total of 20 patients who had undergone computed tomography-based coronary angiography with retrospective electrocardiographic gating were randomly selected for the present study. The patients underwent scanning during DIBH to control the influence of respiration on cardiac motion. Standard medial and lateral tangential fields were placed, and the LADs were contoured on the systolic- and diastolic-phase computed tomography data sets by the clinicians. Displacement of the LAD during cardiac contractions was calculated in three directions: toward the posterior edge of the treatment fields, left-right, and anteroposterior. Displacement of the entire heart was measured on the maximal and minimal intensity projection computed tomography images. Results: The mean displacement of the LAD from cardiac contraction without the influence of respiration for 20 patients was 2.3 mm (range, 0.7-3.8) toward the posterior edge of the treatment fields, 2.6 mm (range, 1.0-6.8) in the left-right direction, and 2.3 mm (range, 0.6-6.5) in the anteroposterior direction. At least 30% of the LAD volume was displaced >5 mm in any direction in 2 patients (10%), and <10% of the LAD volume was displaced >5 mm in 10 patients (50%). The extent of displacement of the heart periphery during cardiac motion was negligible near the treatment fields. Conclusions: Displacement of the heart periphery near the treatment fields was negligible during DIBH; however, displacement of the LAD from cardiac contraction varied substantially between and within patients. We recommend maintaining {>=}5 mm of distance between the LAD and the field edge for patients undergoing breast cancer radiotherapy during DIBH.

Wang Xiaochun, E-mail: xiaochunw@mdanderson.org [Department of Radiation Physics, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States); Pan Tinsu [Department of Imaging Physics, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States); Pinnix, Chelsea [Department of Radiation Oncology, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States); Zhang, Sean X.; Salehpour, Mohammad; Sun, Tzouh Liang [Department of Radiation Physics, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States); Gladish, Gregory [Department of Diagnostic Radiology, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States); Strom, Eric A.; Perkins, George H.; Tereffe, Welela; Woodward, Wendy; Hoffman, Karen E.; Buchholz, Thomas A.; Yu, T. Kuan [Department of Radiation Oncology, University of Texas M.D. Anderson Cancer Center, Houston, TX (United States)

2012-02-01T23:59:59.000Z

248

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

249

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

250

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

251

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

252

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

253

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

254

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

255

Personal vehicles preferred by urban Americans: household automobile holdings and new car purchases projected to the year 2000  

DOE Green Energy (OSTI)

A procedure is described for modeling the choices made in urban American households among personal vehicles on the bases of cost, passenger capacity, and engine technology, and it projects those preferences to the year 1990 and 2000. The results of this disaggregate technique are used by the other predictive research tasks undertaken by Argonne National Laboratory in a project entitled Technology Assessment of Productive Conservation in Urban Transportation (TAPCUT). The vehicle preferences reported here furnish data for the overall TAPCUT objective of forecasting the probable effects of energy conservation policies in transportation. In our projections, vehicles with standard spark-ignition (Otto-cycle) engines continue to dominate automobile holdings and new car purchases in either of two socioeconomic scenarios under any of three settings (an existing policy set and two alternative conservation strategies). From 1990, small cars (seating four or fewer passengers) dominate urban holdings and sales in two of the three TAPCUT energy strategies - the exception being the strategy that emphasizes individual travel - and this holds true with only a minor variation for both socioeconomic scenarios (an optimistic one and a slightly pessimistic one). Advanced-technology vehicles are most successful under the Individual Travel Strategy. It appears that vehicle charateristics are far more significant than demographic descriptors in estimating household vehicle choice using this modeling approach.

Saricks, C.L.; Vyas, A.D.; Bunch, J.A.

1982-01-01T23:59:59.000Z

256

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

257

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

258

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

259

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

260

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

262

Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, And Caustic Wash Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 4 Operations  

Science Conference Proceedings (OSTI)

Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), and Caustic Wash Tank (CWT) samples from several of the ?microbatches? of Integrated Salt Disposition Project (ISDP) Salt Batch (?Macrobatch?) 4 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by inductively-coupled plasma emission spectroscopy (ICPES). Furthermore, samples from the CWT have been analyzed by a variety of methods to investigate a decline in the decontamination factor (DF) of the cesium observed at MCU. The results indicate good decontamination performance within process design expectations. While the data set is sparse, the results of this set and the previous set of results for Macrobatch 3 samples indicate generally consistent operations. There is no indication of a disruption in plutonium and strontium removal. The average cesium DF and concentration factor (CF) for samples obtained from Macrobatch 4 are slightly lower than for Macrobatch 3, but still well within operating parameters. The DSSHT samples show continued presence of titanium, likely from leaching of the monosodium titanate in Actinide Removal Process (ARP).

Peters, T. B.; Fink, S. D.

2012-10-25T23:59:59.000Z

263

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

264

Natural-gas-fired CC unit holds NO[sub x] emissions below 9. 0 ppm  

Science Conference Proceedings (OSTI)

This article describes the East Syracuse generating plant, one of first commercial stations to include LM6000 gas turbines, designed to solve noise and emissions problems. This natural-gas-fired, combined-cycle cogeneration facility provides 97 MW of power to Niagara Mohawk Power Corp and up to 80,000 lb/hr of process steam to a nearby Bristol-Myers Squibb Co plant. The plant's original design had contemplated a base-loaded facility. This stemmed from the original power sales agreement with Niagara Mohawk Power Corp. Flexibility of original design proved advantageous to the East Syracuse (NY) plant when, during the latter stages of construction, the original agreement was renegotiated into a schedulable'' contract. The new agreement now in force, providing for limited dispatch of one of the two gas turbines, is designed around other pre-existing project agreements. Design flexibility and the choice of two gas turbines made the plant capable of meeting dispatch requirements with only minor modifications of plant design and staffing.

Grunbeck, G.

1994-09-01T23:59:59.000Z

265

Outlook and Related Information Requirements  

E-Print Network (OSTI)

This procedure provides the steps required for market participants to submit the information required for the 18-Month Outlook, and specifies the information to be contained in the Outlook. Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information.

unknown authors

2001-01-01T23:59:59.000Z

266

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

267

Time-Resolved  

NLE Websites -- All DOE Office Websites (Extended Search)

Time-Resolved Time-Resolved Time-Resolved Print Of the four fundamental parameters that we use to perceive the physical world (energy, momentum, position, and time) three correspond to the three broad categories of synchrotron experimental measurement techniques: spectroscopy (energy), scattering (momentum), and imaging (position). The fourth parameter-time-can in principle be applied to all the techniques. At the ALS, many experiments can be carried out in real time, with data being recorded from the same sample as it changes over time. Some time-resolved experiments take advantage of the pulsed nature of the ALS's synchrotron radiation, which, like a strobe light, can capture a series of "snapshots" of a process that, when viewed sequentially, show us how a given process evolves over time. Other experiments simply require two pulses: one to "pump" energy into the sample system and a second to probe the system's excited state.

268

The LCLS Timing Event System  

Science Conference Proceedings (OSTI)

The Linac Coherent Light Source requires precision timing trigger signals for various accelerator diagnostics and controls at SLAC-NAL. A new timing system has been developed that meets these requirements. This system is based on COTS hardware with a mixture of custom-designed units. An added challenge has been the requirement that the LCLS Timing System must co-exist and 'know' about the existing SLC Timing System. This paper describes the architecture, construction and performance of the LCLS timing event system.

Dusatko, John; Allison, S.; Browne, M.; Krejcik, P.; /SLAC

2012-07-23T23:59:59.000Z

269

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

270

Managing time  

Science Conference Proceedings (OSTI)

Professionals overwhelmed with information glut can find hope from new insights about time management.

Peter J. Denning

2011-03-01T23:59:59.000Z

271

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

272

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

273

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

274

Precision Timing for Smart Grid Systems  

Science Conference Proceedings (OSTI)

... how new features and requirements for time synchronization can impact the performance of next-generation power distribution applications. ...

2013-04-29T23:59:59.000Z

275

Entropic Time  

Science Conference Proceedings (OSTI)

The formulation of quantum mechanics within the framework of entropic dynamics includes several new elements. In this paper we concentrate on one of them: the implications for the theory of time. Entropic time is introduced as a book-keeping device to keep track of the accumulation of changes. One new feature is that, unlike other concepts of time appearing in the so-called fundamental laws of physics, entropic time incorporates a natural distinction between past and future.

Caticha, Ariel [Department of Physics, University at Albany-SUNY, Albany, NY 12222 (United States)

2011-03-14T23:59:59.000Z

276

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

277

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

278

High speed, low power 100 MS/s front end track-and-hold amplifier for ten-bit pipelined ADC  

Science Conference Proceedings (OSTI)

The work focuses on the design of a high speed, low power track-and-hold amplifier (THA) for ten-bit 100 MS/s pipelined analogue-to-digital converter (ADC). A wide bandwidth and high gain two-stage ... Keywords: #, 47, CMFB, HPSA, MDAC, MHz, MS&, amplifier design, common-mode feedback, digital to analogue converters, high-performance systems architecture, hold amplifiers, mega samples per second, megahertz, multiplying DAC, nanometres, nm, operational transconductance amplifiers, peak, peak-to-, s, switched capacitors, track-and-

D. Meganathan; Raja Paul Perinbam; R. Deepalakshmi

2009-12-01T23:59:59.000Z

279

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

280

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

TIMING APPARATUS  

DOE Patents (OSTI)

The timing device comprises an escapement wheel and pallet, a spring drive to rotate the escapement wheel to a zero position, means to wind the pretensioned spring proportional to the desired signal time, and a cam mechanism to control an electrical signal switch by energizing the switch when the spring has been wound to the desired position, and deenergizing it when it reaches the zero position. This device produces an accurately timed signal variably witain the control of the operator.

Bennett, A.E.; Geisow, J.C.H.

1956-04-17T23:59:59.000Z

282

Probabilistic timed behavior trees  

Science Conference Proceedings (OSTI)

The Behavior Tree notation has been developed as a method for systematically and traceably capturing user requirements. In this paper we extend the notation with probabilistic behaviour, so that reliability, performance, and other dependability properties ... Keywords: behavior trees, model checking, probabilities, timed automata

Robert Colvin; Lars Grunske; Kirsten Winter

2007-07-01T23:59:59.000Z

283

SOLVENT HOLD TANK SAMPLE RESULTS FOR MCU-13-814, MCU-13-815, MCU-13-816, MCU-13,817, MCU-13-818 AND MCU-13-819: QUARTERLY SAMPLE FROM MAY 2013  

SciTech Connect

Savannah River National Laboratory (SRNL) analyzed solvent samples from Modular Caustic-Side Solvent Extraction Unit (MCU) in support of continuing operations. A quarterly analysis of the solvent is required to maintain solvent composition within specifications. Analytical results of the analyses of Solvent Hold Tank (SHT) samples MCU-13-814, MCU-13-815, MCU-13-816, MCU-13-817, MCU-13-818 and MCU-13- 819 received May 28, 2013 are reported. The results show that the solvent at MCU does not require an Isopar L addition, but it will require addition of trioctylamine despite of the 272 g of TOA that was added to the solvent on June 5, 2013 based on the solvent containing a TOA level of 45% of nominal. A new TOA analysis method (HCl titration) has been used and its output was statistically similar to the results from the SVOA-TOA method. This method provides an independent method for measuring TOA and TiDG in MCU-NG solvent. An impurity containing a tert-butyl group was detected in the solvent and further analytical analysis is needed to identify it. SRNL recommends determining the impact of this impurity on the mass transfer ability of the solvent. SRNL also analyzed the SHT sample for {sup 137}Cs content and determined the measured value is above the results observed from the January 2013.

Fondeur, F.; Taylor-Pashow, K.

2013-08-13T23:59:59.000Z

284

Tracking Quintessence Would Require Two Cosmic Coincidences  

E-Print Network (OSTI)

Good tracking requires that the quintessence energy fraction slowly increase while the roll $\\lambda\\equiv -d\\ln V/\\varkappa d\\phi$ slowly decreases, but is not yet truly slow-rolling. The supernova bound on the present quintessence equation of state requires either (1) a cosmological constant or other fine-tuned "crawling quintessence" or (2) "roll-over quintessence" that tracked until recently, but now became slow rolling, because of a sharp increase in potential curvature. Thus, fine-tuning is required by constant equation of state and inverse power potentials, but can be avoided by the SUGRA and Skordis-Albrecht potentials and other good trackers, provided quintessence energy domination and slow roll {\\em both} began only recently. This makes the time in which we live special in {\\em two} respects.

Sidney Bludman

2004-03-22T23:59:59.000Z

285

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

286

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

287

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

288

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

289

Establishing Design Requirements for Energy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Establishing Design Requirements for Energy Establishing Design Requirements for Energy Establishing Design Requirements for Energy October 16, 2013 - 5:14pm Addthis Programming defines details about the project, including square footage, types of building space, and use. The team should make decisions to define the energy needs of the building. Beyond traditional project goals and criteria, the team should also define energy-specific requirements and provisions for integrating renewable energy into the building. Federal energy requirements should be considered during programming to establish design criteria that meet those requirements. Overall, the programming phase is the time to establish design requirements and criteria that make sure building design meets the agency's energy efficiency and renewable energy use needs. It is also the time to establish selection

290

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

291

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

292

Deep carbon reductions in California require electrification and  

NLE Websites -- All DOE Office Websites (Extended Search)

Deep carbon reductions in California require electrification and Deep carbon reductions in California require electrification and integration across economic sectors Title Deep carbon reductions in California require electrification and integration across economic sectors Publication Type Journal Article Year of Publication 2013 Authors Wei, Max, James H. Nelson, J. Greenblatt, Ana Mileva, Josiah Johnston, Michael K. Ting, Christopher Yang, Christopher M. Jones, James E. McMahon, and Daniel M. Kammen Journal Environmental Research Letters Volume 8 Issue 1 Abstract Meeting a greenhouse gas (GHG) reduction target of 80% below 1990 levels in the year 2050 requires detailed long-term planning due to complexity, inertia, and path dependency in the energy system. A detailed investigation of supply and demand alternatives is conducted to assess requirements for future California energy systems that can meet the 2050 GHG target. Two components are developed here that build novel analytic capacity and extend previous studies: (1) detailed bottom-up projections of energy demand across the building, industry and transportation sectors; and (2) a high-resolution variable renewable resource capacity planning model (SWITCH) that minimizes the cost of electricity while meeting GHG policy goals in the 2050 timeframe. Multiple pathways exist to a low-GHG future, all involving increased efficiency, electrification, and a dramatic shift from fossil fuels to low-GHG energy. The electricity system is found to have a diverse, cost-effective set of options that meet aggressive GHG reduction targets. This conclusion holds even with increased demand from transportation and heating, but the optimal levels of wind and solar deployment depend on the temporal characteristics of the resulting load profile. Long-term policy support is found to be a key missing element for the successful attainment of the 2050 GHG target in California.

293

Fast algorithms for time series with applications to finance, physics, music, biology, and other suspects  

Science Conference Proceedings (OSTI)

Financial time series streams are watched closely by millions of traders. What exactly do they look for and how can we help them do it faster? Physicists study the time series emerging from their sensors. The same question holds for them. Musicians produce ...

Alberto Lerner; Dennis Shasha; Zhihua Wang; Xiaojian Zhao; Yunyue Zhu

2004-06-01T23:59:59.000Z

294

A Sparse Grid SpaceTime Discretization Scheme for Parabolic Problems  

E-Print Network (OSTI)

A Sparse Grid Space­Time Discretization Scheme for Parabolic Problems Michael Griebel, Daniel Oeltz Abstract In this paper we consider the discretization in space and time of parabolic di#erential equations. This holds in many applications due to the smoothing properties of the propagator of the parabolic PDE (heat

Bartels, Soeren

295

Real time estimation of Bayesian networks  

Science Conference Proceedings (OSTI)

For real time evaluation of a Bayesian network when there is not sufficient time to obtain an exact solution, a guaranteed response time, approximate solution is required. It is shown that non traditional methods utilizing estimators based on an archive ...

Robert L. Welch

1996-08-01T23:59:59.000Z

296

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

297

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

298

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

299

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors. (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

300

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

302

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

303

Oceans cover almost three-quarters of the Earth's surface, and hold over nine-tenths of the planet's water.  

E-Print Network (OSTI)

, wave and tidal power). G Sustainable fishery management requires joined-up, interdisciplinary science to predict tides and storm surges accurately G how the oceans' biological productivity depends on tiny plants

Brierley, Andrew

304

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

305

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

306

Digestion time  

NLE Websites -- All DOE Office Websites (Extended Search)

Digestion time Digestion time Name: Don Mancosh Location: N/A Country: N/A Date: N/A Question: I have always given the rule of thumb in class that material we eat is with us for about 24 hours before exiting the body. The question arises about the time value of liquids. Getting a big coke prior to a 3 hour drive generally means that there will be a stop along the way. Is there a generalization made about liquids in the body similar to the one for solid food? Replies: A physician would give a better answer, but I hazard this: the only liquids which people consume (deliberately) in significant quantities are water, ethyl alcohol and various oils. Water and alcohol are absorbed on a time scale of seconds to minutes through the mouth, stomach and digestive tract. The oils are huge molecules, so I'd guess like any other greasy food they get absorbed in the upper digestive tract. Some of them, perhaps the longest and most nonpolar, are not absorbed at all --- cf. the old-time remedy of mineral oil for constipation --- so there should be some average time-before-what's-left-is-excreted such as you're looking for, and my (wild) guess is that it would not differ substantially from that for food. You can define an average lifetime in the body for alcohol, since the natural level is zero. Rough guidelines are widespread in the context of drunk driving laws. But this is not really possible for water. One's body is normally full up to the brim with water, and there's no way for the body to distinguish between water molecules recently absorbed and molecules that've been moping around since the Beatles split up. Thus the water entering the toilet bowl after the pit stop is not in general the same water as was in the big coke. If you were to consider for water just the average time between drinking and peeing, it would seem to depend strongly on how well hydrated the body was before the drink, and how much was drunk. During sustained heavy exertion in the sun and dry air one can easily drink a pint of water an hour without peeing at all. On the other hand, if one is willing to drink enough water fast enough, so as to establish a high excess of body water one can pee 8 ounces 15 minutes or less after drinking 8 ounces.

307

Personalised time-dependent learning  

Science Conference Proceedings (OSTI)

Time-dependent instruction appears to shape next-generation learning systems, where the value of instruction is as important as the time it takes to learn. The ability to grasp the exact knowledge required to accomplish a specific task, in the ... Keywords: adaptive learning, authoring tools, knowledge management, learning granularity, learning objects, learning resources, learning technology, learning web, ontology, personalised learning, semantic web, time constraints, time-dependent learning, timeliness

R. Benlamri; Y. Atif; J. Berri

2009-04-01T23:59:59.000Z

308

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

309

Quantum tunneling time  

E-Print Network (OSTI)

A simple model of a quantum clock is applied to the old and controversial problem of how long a particle takes to tunnel through a quantum barrier. The model I employ has the advantage of yielding sensible results for energy eigenstates, and does not require the use of time-dependant wave packets. Although the treatment does not forbid superluminal tunneling velocities, there is no implication of faster-than-light signaling because only the transit duration is measurable, not the absolute time of transit. A comparison is given with the weak-measurement post-selection calculations of Steinberg.

P. C. W. Davies

2004-03-01T23:59:59.000Z

310

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

311

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

312

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

313

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

314

API Requirements for Dynamic Graph Prediction  

SciTech Connect

Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

Gallagher, B; Eliassi-Rad, T

2006-10-13T23:59:59.000Z

315

Capture and evolution of web requirements using webspec  

Science Conference Proceedings (OSTI)

Developing Web applications is a complex and time consuming process that involves different kind of people, ranging from customers to developers. Requirement artefacts play an important role as they are used by these people to perform their daily activities. ...

Esteban Robles Luna; Irene Garrigs; Julin Grigera; Marco Winckler

2010-07-01T23:59:59.000Z

316

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

317

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

318

POLOIDAL FLUX LINKAGE REQUIREMENTS FOR THE INTERNATIONAL THERMONUCLEAREXPERIMENTAL REACTOR  

E-Print Network (OSTI)

the poloidal flux linkage requirements for the current ramp-up and for the flat-top phase of the proposed [2] and JSOLVER [3] to calculate the flux linkage requirements during the current ramp-up and steady regarding the plasma ramp-up time, and the amount of flux linkage change that the poloidal field coil system

319

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

320

Resources required for topological quantum factoring  

Science Conference Proceedings (OSTI)

We consider a hypothetical topological quantum computer composed of either Ising or Fibonacci anyons. For each case, we calculate the time and number of qubits (space) necessary to execute the most computationally expensive step of Shor's algorithm, modular exponentiation. For Ising anyons, we apply Bravyi's distillation method [S. Bravyi, Phys. Rev. A 73, 042313 (2006)] which combines topological and nontopological operations to allow for universal quantum computation. With reasonable restrictions on the physical parameters we find that factoring a 128-bit number requires approximately 10{sup 3} Fibonacci anyons versus at least 3x10{sup 9} Ising anyons. Other distillation algorithms could reduce the resources for Ising anyons substantially.

Baraban, M. [Department of Physics, Yale University, 217 Prospect Street, New Haven, Connecticut 06511 (United States); Bonesteel, N. E. [Department of Physics and National High Magnetic Field Laboratory, Florida State University, Tallahassee, Florida 32310 (United States); Simon, S. H. [Rudolf Peierls Centre for Theoretical Physics, Oxford University, 1 Keble Road, Oxford OX1 3NP (United Kingdom)

2010-06-15T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Quality Assurance Requirements and Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

322

Nano-science Safety Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-science Safety Requirements Effective Date 12/6/2011 Nano-science Safety Requirements Effective Date 12/6/2011 The only official copy of this file is the one on-line. Before using a printed copy, verify that it is the most current version by checking the effective date. Page 1 of 3 Prepared By: L. Stiegler Low Risk - Embedded or Fixed Nanostructures (nanomaterials, incapable as a practical matter, of becoming airborne) Ensure that fixed nanomaterials are not subjected to actions that may generate Unbound NanoParticles (UNP). * For work outside of a HEPA filtered exhaust hood: o No Mechanical stresses e.g., (grinding, scraping, or pressing). o No thermal stresses o Cover samples when practical e.g., (slide cover, Kapton tape, Mylar tape, or cellophane tape). Samples/container must be labeled if not used immediately.

323

Requirements for signaling channel authentication  

SciTech Connect

This contribution addresses requirements for ATM signaling channel authentication. Signaling channel authentication is an ATM security service that binds an ATM signaling message to its source. By creating this binding, the message recipient, and even a third party, can confidently verify that the message originated from its claimed source. This provides a useful mechanism to mitigate a number of threats. For example, a denial of service attack which attempts to tear-down an active connection by surreptitiously injecting RELEASE or DROP PARTY messages could be easily thwarted when authenticity assurances are in place for the signaling channel. Signaling channel authentication could also be used to provide the required auditing information for accurate billing which is impervious to repudiation. Finally, depending on the signaling channel authentication mechanism, end-to-end integrity of the message (or at least part of it) can be provided. None of these capabilities exist in the current specifications.

Tarman, T.D.

1995-12-11T23:59:59.000Z

324

Functional Requirements and Use Cases  

E-Print Network (OSTI)

iously also beneficial in information systems development, staging core functionality for early releases and adding features over the course of several subsequent releases. In many industries, companies produce product lines with different cost/feature variations per product in the line, and product families that include a number of product lines targeted at somewhat different markets or usage situations. What makes these product lines part of a family, are some common elements of functionality and identity. A platform-based development approach leverages this commonality, utilizing a set of reusable assets across the family. These strategies have important implications for software architecture. In particular, it is not just the functional requirements of the first product or release that must be supported by the architecture. The functional requirements of early (nearly concurrent) releases need to be explicitly taken into account. Later releases are accommodated through architectu

System Has Properties; Ruth Malan; Dana Bredemeyer

2005-01-01T23:59:59.000Z

325

Evaluate deaerator steam requirements quickly  

Science Conference Proceedings (OSTI)

Steam plant engineers frequently have to perform energy balance calculations around the deaerator to estimate the steam required to preheat and deaerate the make-up water and condensate returns. This calculation involves solving two sets of equations, one for mass and the other for energy balance. Reference to steam tables is also necessary. However, with the help of this program written in BASIC, one can arrive at the make-up water and steam requirements quickly, without referring to steam tables. This paper shows the mass and energy balance equations for the deaerator. This paper gives the program listing. An number of condensate returns can be handled. An example illustrates the use of the program.

Ganapathy, V. (ABCO Industries, Inc., Abilene, TX (US))

1991-02-01T23:59:59.000Z

326

Whole-heart magnetic resonance coronary angiography with multiple breath-holds and automatic breathing-level tracking  

Science Conference Proceedings (OSTI)

Whole-heart (WH) magnetic resonance coronary angiography (MRCA) studies are usually performed during free breathing while monitoring the position of the diaphragm with real-time motion correction. However

Shigehide Kuhara; Ayako Ninomiya; Tomohisa Okada; Shotaro Kanao; Toshikazu Kamae; Kaori Togashi

2010-01-01T23:59:59.000Z

327

Time-Constrained Loop Pipelining  

Science Conference Proceedings (OSTI)

This paper addresses the problem of Time-Constrained Loop Pipelining, i.e. given a fixed throughput, finding a schedule of a loop which minimizes resource requirements. This paper proposes a methodology, called TCLP, based on dividing the problem into ... Keywords: loop pipelining, scheduling, timing and resource contraints, register optimization

Fermin Sanchez

1995-12-01T23:59:59.000Z

328

Present and Future Computing Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computational Cosmology for Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical Program Review November 27-28, 2012

329

Time Brightness  

NLE Websites -- All DOE Office Websites (Extended Search)

Perlmutter, et al., in Thermonuclear Supernovae, NATO ASI, v. 486 (1997) Perlmutter, et al., in Thermonuclear Supernovae, NATO ASI, v. 486 (1997) Cosmology from . . . Time Brightness ... . . . 50-100 Fields Lunar Calendar Scheduled Follow-Up Imaging at Hubble, Cerro Tololo, WIYN, Isaac Newton Scheduled Follow-Up Spectroscopy at Keck Almost 1000 Galaxies per Field RESULT: ~24 Type Ia supernovae discovered while still brightening, at new moon Berkeley Lab Keck WIYN Cerro Tololo Isaac Newton Hubble Strategy We developed a strategy to guarantee a group of supernova discoveries on a certain date. Just after a new moon, we observe some 50 to 100 high-galactic lattitute fields-each containing almost a thousand high-redshift galaxies-in two nights on the Cerro Tololo 4-meter telescope with Tyson & Bernstein's wide-field camera. We return three weeks later to observe the same

330

Time-Constrained Loop Pipelining  

E-Print Network (OSTI)

This paper addresses the problem of Time-Constrained Loop Pipelining, i.e. given a fixed throughput, finding a schedule of a loop which minimizes resource requirements. We propose a methodology, called TCLP, based on dividing the problem into two simpler and independent tasks: retiming and scheduling. TCLP explores different sets of resources, searchingfor a maximum resource utilization. This reduces area requirements. After a minimum set of resourceshas been found, the execution throughput is increased and the number of registers required by the loop schedule is reduced. TCLP attempts to generate a schedule which minimizes cost in time and area (resources and registers). The results show that TCLP obtains optimal schedules in most cases. 1 Introduction This paper presents TCLP, a methodology to solve TimeConstrained Loop Pipelining. TCLP is NP-complete [3]. Two types of timing constraints (TCs) have been considered in the literature: local TCs to specify minimum and/or maximum TCs ...

Fermn Sanchez; Jordi Cortadella

1995-01-01T23:59:59.000Z

331

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

332

An IEEE 1588 performance testing dashboard for power industry requirements  

Science Conference Proceedings (OSTI)

The numerous time synchronization performance requirements in the Smart Grid necessitate a set of common metrics and test methods. The test methods help to verify the ability of the network system and its components to meet the power industry's accuracy, ... Keywords: IEEE 1588, PMU, conformance testing, test methods, time synchronization

Julien Amelot; Jeffrey Fletcher; Ya-Shian Li-Baboud; Dhananjay Anand; Clement Vasseur; James Moyne

2012-03-01T23:59:59.000Z

333

SUPPLEMENTAL ANALYSES FOR SOLVENT HOLD TANK SAMPLES MCU-11-314, MCU-11-315, MCU-11-316, MCU-11-317, MCU-11-318 AND MCU-11-319  

SciTech Connect

Savannah River National Laboratory (SRNL) periodically analyses solvent samples from Modular Caustic-Side Solvent Extraction Unit (MCU) in support of continuing operations. A quarterly analysis of the solvent is required to maintain solvent composition within specifications. Analytical results of the analyses of Solvent Hold Tank (SHT) samples MCU-11-314, MCU-11-315, MCU-11-316, MCU-11-317, MCU-11-318 and MCU-11-319 have been previously reported. MCU has experienced a modest decline in cesium removal efficiency while processing the current feed, 'Macrobatch 3'. While the target decontamination factor (DF) is 200, the fiscal year 2011 DF average is 161. The results of the prior solvent analysis report did not identify a specific factor that would correlate with the poor cesium decontamination beyond a low concentration of the suppressor, trioctylamine. New analyses of the quarterly sample are reported in this document, as well as a cross-check of {sup 137}Cs measurements for SRNL and F/H lab. Furthermore, in an attempt to discover the reason for the decline in DF at MCU, SRNL was tasked with analyzing numerous Caustic Wash Tank (CWT) and chemical feed samples.

Peters, T.; Washington, A; . Fondeur, F.; Fink, S.

2011-09-29T23:59:59.000Z

334

Development of a New Laser Beacon for Time Calibration in the ANTARES Neutrino Telescope  

Science Conference Proceedings (OSTI)

The ANTARES collaboration has built a deep sea neutrino telescope in the Mediterranean Sea consisting of a matrix of pressure resistant glass spheres holding large area photomultipliers. The aim of the telescope is to observe cosmic neutrinos through ... Keywords: Deep Sea Instrumentation, Time Calibration Device, Neutrino Telescope, Laser Beacon.

Umberto Emanuele; Diego Real; Fernando Urbano; Juan de Dios Zornoza; Juan Zuniga

2011-10-01T23:59:59.000Z

335

Microsoft Word - Requirements 0819.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

336

Does resolving PvNP require a paradigm shift?  

E-Print Network (OSTI)

I shall argue that a resolution of the PvNP problem requires building an iff bridge between the domain of provability and that of computability. The former concerns how a human intelligence decides the truth of number-theoretic relations, and is formalised by the first-order Peano Arithmetic PA following Dededekind's axiomatisation of Peano's Postulates. The latter concerns how a human intelligence computes the values of number-theoretic functions, and is formalised by the operations of a Turing Machine following Turing's analysis of computable functions. I shall show that such a bridge requires objective definitions of both an `algorithmic' interpretation of PA, and an `instantiational' interpretation of PA. I shall show that both interpretations are implicit in the definition of the subjectively defined `standard' interpretation of PA. However the existence of, and distinction between, the two objectively definable interpretations---and the fact that the former is sound whilst the latter is not---is obscured by the extraneous presumption under the `standard' interpretation of PA that Aristotle's particularisation must hold over the structure N of the natural numbers. I shall argue that recognising the falseness of this belief awaits a paradigm shift in our perception of the application of Tarski's analysis (of the concept of truth in the languages of the deductive sciences) to the `standard' interpretation of PA. I shall then show that an arithmetical formula [F] is PA-provable if, and only if, [F] interprets as true under an algorithmic interpretation of PA. I shall finally show how it then follows from Goedel's construction of a formally `undecidable' arithmetical proposition that there is a Halting-type PA formula which---by Tarski's definitions---is algorithmically verifiable as true, but not algorithmically computable as true, under a sound interpretation of PA.

Bhupinder Singh Anand

2010-03-29T23:59:59.000Z

337

Analytical Requirements for Petroleum Contaminated Soils  

E-Print Network (OSTI)

Analytical Requirements for Petroleum Contaminated Soils According to 20 NMAC 9.1.704 704. REQUIRED), or other applicable statutes. Page 1 of 1Analytical Requirements for Petroleum Contaminated Soils 4

338

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network (OSTI)

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

339

Capital requirements for the transportation of energy materials: 1979 arc estimates  

Science Conference Proceedings (OSTI)

Summaries of transportation investment requirements through 1990 are given for the low, medium and high scenarios. Total investment requirements for the three modes and the three energy commodities can accumulate to a $46.3 to $47.0 billion range depending on the scenario. The high price of oil, following the evidence of the last year, is projected to hold demand for oil below the recent past. Despite the overall decrease in traffic some investment in crude oil and LPG pipelines is necessary to reach new sources of supply. Although natural gas production and consumption is projected to decline through 1990, new investments in carrying capacity also are required due to locational shifts in supply. The Alaska Natural Gas Transportation System is the dominant investment for energy transportation in the next ten years. This year's report focuses attention on waterborne coal transportation to the northeast states in keeping with a return to significant coal consumption projected for this area. A resumption of such shipments will require a completely new fleet. The investment estimates given in this report identify capital required to transport projected energy supplies to market. The requirement is strategic in the sense that other reasonable alternatives do not exist or that a shared load of new growth can be expected. Not analyzed or forecasted are investments in transportation facilities made in response to local conditions. The total investment figures, therefore, represent a minimum necessary capital improvement to respond to changes in interregional supply conditions.

Not Available

1980-08-29T23:59:59.000Z

340

Military power requirements and backup power considerations  

Science Conference Proceedings (OSTI)

All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs.

Botts, T.E.

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Strategic forces: Future requirements and options  

SciTech Connect

In the wake of the collapse of the Warsaw Pact and the apparent ending of the Cold War, there have been renewed calls for radical cuts in US strategic forces to levels far below the 10,000 or so warheads allowed each side under the current START proposal. Since it now appears that NATO for the first time will have the capability to defeat a Soviet conventional attack without the necessity of threatening to resort to nuclear weapons, this should pave the way for the rethinking of US strategy and the reduction of US strategic weapons requirements. In this new environment, it seems plausible that, with a modification of the Flexible Response doctrine to forego attempts to disarm the Soviet Union, deterrence could be maintained with 1500 or so survivable strategic weapons. With a new strategy that confined US strategic weapons to the role of deterring the use of nuclear weapons by other countries, a survivable force of about 500 weapons would seem sufficient. With this premise, the implications for the US strategic force structure are examined for two cases: a treaty that allows each side 3000 warheads and one that allows each side 1000 warheads. In Part 1 of this paper, the weapons requirements for deterrence are examined in light of recent changes in the geopolitical environment. In Part 2, it is assumed that the President and Congress have decided that deep cuts in strategic forces are acceptable. 128 refs., 12 figs., 12 tabs. (JF)

Speed, R.D.

1990-11-01T23:59:59.000Z

342

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses, Supervisory Essentials and Navigating the Federal Hiring Process are required to fulfill the first 40-hour of the probationary period mandatory training requirement for new supervisors. All other courses listed in the training framework are suggested to meet overall continual learning requirements. Supervisory Training Requirements More Documents & Publications EM's Development Program for New Managers/Supervisors Presentation DOE F 3315.1 Supervisory - Non-Supervisory Employee Performance Management and

343

Cold vacuum drying facility design requirements  

SciTech Connect

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

344

ALS Beamline Design Requirements - Revision 1  

E-Print Network (OSTI)

the beamline including: Electrical power requirements e.at the ALS include: Electrical power: 480VAC, 208VAC, 120terminations, and electrical power requirements. Beamline

Heimann, Phil

2010-01-01T23:59:59.000Z

345

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

346

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental...

347

Federal Energy Management Program: Federal Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Requirements to someone by E-mail Share Federal Energy Management Program: Federal Requirements on Facebook Tweet about Federal Energy Management Program: Federal...

348

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

349

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

350

NERSC/DOE HEP Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 High Energy Physics (HEP) Logistics Workshop Logistics Workshop Location Hilton Washington...

351

Alternative Fuels Data Center: Petroleum Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Petroleum Reduction Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Petroleum Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Petroleum Reduction Requirements The Wisconsin Department of Administration's fleet management policy

352

Alternative Fuels Data Center: Vehicle Registration Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Registration Vehicle Registration Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Registration Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Registration Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Registration Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Registration Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Registration Requirement Motor vehicle registration applicants must provide proof of compliance with

353

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

354

Studying the Communications Requirements of Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

355

Communications Requirements of Smart Grid Technologies | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy...

356

Power requirements for a rapid-fire projectile toy concept  

E-Print Network (OSTI)

The toy industry holds a large portion of the American consumer market, and new products are in constant demand. A new mechanism for use in children's toys has been proposed to fire small plastic balls at a rate of over ...

Hurwich, Andrew (Andrew B.)

2008-01-01T23:59:59.000Z

357

How Required Reserve Ratio Affects Distribution and Velocity of Money  

E-Print Network (OSTI)

In this paper the dependence of wealth distribution and the velocity of money on the required reserve ratio is examined based on a random transfer model of money and computer simulations. A fractional reserve banking system is introduced to the model where money creation can be achieved by bank loans and the monetary aggregate is determined by the monetary base and the required reserve ratio. It is shown that monetary wealth follows asymmetric Laplace distribution and latency time of money follows exponential distribution. The expression of monetary wealth distribution and that of the velocity of money in terms of the required reserve ratio are presented in a good agreement with simulation results.

Xi, N; Wang, Y; Xi, Ning; Ding, Ning; Wang, Yougui

2005-01-01T23:59:59.000Z

358

Assessment of tritium breeding requirements for fusion power reactors  

Science Conference Proceedings (OSTI)

This report presents an assessment of tritium-breeding requirements for fusion power reactors. The analysis is based on an evaluation of time-dependent tritium inventories in the reactor system. The method presented can be applied to any fusion systems in operation on a steady-state mode as well as on a pulsed mode. As an example, the UWMAK-I design was analyzed and it has been found that the startup inventory requirement calculated by the present method significantly differs from those previously calculated. The effect of reactor-parameter changes on the required tritium breeding ratio is also analyzed for a variety of reactor operation scenarios.

Jung, J.

1983-12-01T23:59:59.000Z

359

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements  

E-Print Network (OSTI)

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements 1 Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 6000BSE RG 6412 NUCLEAR ENGINEERING no exceptions here) RG 6521 NUCLEAR ENGINEERING AND RADIOLOGICAL SCIENCES RESIDENCY, GPA REQUIREMENTS Effective

Shyy, Wei

360

A systematic review of security requirements engineering  

Science Conference Proceedings (OSTI)

One of the most important aspects in the achievement of secure software systems in the software development process is what is known as Security Requirements Engineering. However, very few reviews focus on this theme in a systematic, thorough and unbiased ... Keywords: Requirements engineering, Secure development, Security, Security engineering, Security requirements, Security requirements engineering, Systematic review

Daniel Mellado; Carlos Blanco; Luis E. Snchez; Eduardo Fernndez-Medina

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

throughout the city. In California, one solar-coveredcommuters electric cars. California requires that, by 2025,

Shoup, Donald

2012-01-01T23:59:59.000Z

362

The emergence of requirements networks: the case for requirements inter-dependencies  

Science Conference Proceedings (OSTI)

Do system requirements depend on each other? Or, do system requirements live in an isolated world of their own and act independently by being completely oblivious to the presence of other requirements? Since a singular requirement does ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

363

Upgrade of NSLS timing system  

SciTech Connect

We report on the progress of the new NSLS timing system. There are three types of requirements for NSLS timing system: clocks, synchronization and trigger circuits. All ring revolution frequency clocks are generated using ECL and high speed TTL logic. The synchronization circuits allows to fill both storage rings with any bunch pattern. The triggers are generated by using commercially available digital delay generators. The delay unit`s outputs are ultrastable, with a resolution of 5 ps, and are programmed by computer via IEEE 488 interface. The block diagrams, description of all major timing components and the present status are provided in this paper.

Singh, O.; Ramamoorthy, S.; Sheehan, J.; Smith, J.

1995-05-01T23:59:59.000Z

364

Time-parareal parallel in time integrator solver for time-dependent neutron diffusion equation  

E-Print Network (OSTI)

-dependent spatial flux distribution in nuclear reactor is required for nuclear safety and design. The motivation present a time-parallel algorithm that simulate the kinetic of neutron2 in a nuclear reactor. We consider engine behavior and in particular its energy4 production.5 The flux distribution on the nuclear reactor

365

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

366

Part B - Requirements & Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B - Requirements & Funding Information B - Requirements & Funding Information PART B - Requirements & Funding Information .......................................................................................... 2 PART B - Requirements & Funding Information B.1. Purpose This Part of the IA (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting Agency' sufficient to demonstrate a bona fide need and identifies funds associated with the requirement to allow [insert the name of agency/organization that will provide acquisition services for the Department of Energy], hereinafter 'the Servicing Agency,' to provide acquisition assistance and conduct an interagency acquisition.

367

Renewable Energy Requirements for Future Building Codes: Options for Compliance  

Science Conference Proceedings (OSTI)

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft{sup 2} of roof area or 0.5 W/ft{sup 2} of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft{sup 2} of r

Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.; Russo, Bryan J.

2011-09-30T23:59:59.000Z

368

Power supply requirements for a tokamak fusion reactor  

DOE Green Energy (OSTI)

The power supply requirements for a 7-M major radius commercial tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and MHD calculations, and power supply characteristics and cost data. A conventional system using an MGF set and solid-state rectifier/inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (approx. > 8 s) seems to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development.

Brooks, J.N.; Kustom, R.L.

1979-02-01T23:59:59.000Z

369

Falling into time in Homer's 'Iliad'  

E-Print Network (OSTI)

of agelessness through ambrosia and nectar. As she argues,but the infusion of ambrosia and nectar works to hold back

Purves, A

2006-01-01T23:59:59.000Z

370

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial vehicle or gasoline powered vehicle may not idle for more than five minutes during any 60-minute period. Exemptions are allowed for the

371

Alternative Fuels Data Center: Biodiesel Warranty Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Warranty Warranty Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Warranty Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Warranty Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Warranty Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Warranty Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Warranty Requirement All new state government diesel vehicles must have a manufacturer's warranty that allows the use of biodiesel blends of 20% (B20) in the

372

Alternative Fuels Data Center: Biofuels Blender Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Blender Biofuels Blender Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Blender Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Blender Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Blender Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Blender Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Blender Requirements Blenders of ethanol and gasoline and biodiesel and diesel fuels outside of the bulk transfer terminal system must obtain a blender's license and are

373

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A gasoline-fueled motor vehicle is not allowed to operate for more than three consecutive minutes when the vehicle is not in motion, with the

374

Alternative Fuels Data Center: Biodiesel Sales Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Sales Biodiesel Sales Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Sales Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Sales Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Sales Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Sales Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Sales Requirements It is unlawful for any person to sell, offer for sale, assist in the sale of, deliver, or permit to be sold or offered for sale any biodiesel,

375

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle at a loading zone, parking or service area, route terminal, or other off-street areas, except for the following situations:

376

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle engine may not operate for more than five consecutive minutes when the vehicle is not in motion, with the following exceptions:

377

Alternative Fuels Data Center: Idle Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirements Effective May 1, 2014, a driver may not idle his or her motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if

378

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel vehicles with a gross vehicle weight rating over 10,000 pounds may not idle for more than five minutes in any continuous 60 minute period.

379

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Any motor vehicle fuel sold at retail containing more than 1% ethanol or methanol must be labeled according to Connecticut Department of Consumer

380

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles may not idle unnecessarily for longer than five consecutive minutes during any 60-minute period. This includes heavy-duty diesel

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel truck or bus engines may not idle for more than 15 consecutive minutes. Exemptions apply to diesel trucks or buses for which the Nevada

382

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement All gasoline containing 1% or more ethanol by volume offered for sale must be conspicuously identified as "with ethanol" or "containing ethanol."

383

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A person that operates a diesel powered motor vehicle in certain counties and townships may not cause or allow the motor vehicle, when it is not in

384

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 75% of the Missouri Department of Transportation (MoDOT) vehicles and heavy equipment that use diesel fuel must be fueled with biodiesel

385

Alternative Fuels Data Center: Biofuel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Use Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirement State agencies must take all reasonable actions to develop the infrastructure necessary to increase the availability and use of E85 and biodiesel throughout the state. Employees using state-owned vehicles are

386

Mobile IP Authentication, Authorization, and Accounting Requirements  

Science Conference Proceedings (OSTI)

The Mobile IP and Authentication, Authorization, Accounting (AAA) working groups are currently looking at defining the requirements for Authentication, Authorization, and Accounting. This document contains the requirements which would have to be supported ...

S. Glass; T. Hiller; S. Jacobs; C. Perkins

2000-10-01T23:59:59.000Z

387

Salt Lake City- High Performance Buildings Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

388

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

389

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Network Requirements for ESnet Update to the 2002 Office ofNetwork Requirements for ESnet Update to the 2002 Office ofEdited by Eli Dart, ESnet Engineering Staff dart@es.net

2006-01-01T23:59:59.000Z

390

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

391

Alternative Fuels Data Center: Emissions Control Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Control Emissions Control Requirement to someone by E-mail Share Alternative Fuels Data Center: Emissions Control Requirement on Facebook Tweet about Alternative Fuels Data Center: Emissions Control Requirement on Twitter Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Google Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Delicious Rank Alternative Fuels Data Center: Emissions Control Requirement on Digg Find More places to share Alternative Fuels Data Center: Emissions Control Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Control Requirement Heavy-duty diesel vehicles used to perform federally funded state public works contracts must be powered by engines with Level 3 emissions control

392

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A diesel- or gasoline-powered motor vehicle may not idle for more than three consecutive minutes, except under the following conditions: 1) to

393

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Motor fuel containing more than 1% ethanol or methanol may not be sold or offered for sale from a motor fuel dispenser unless the individual selling

394

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 20% of all diesel fuel used to fuel state agency vehicles, vessels, and construction equipment must be biodiesel. The Washington

395

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles licensed for commercial or public service may not idle for more than three minutes in commercial or residential urban areas, unless

396

Alternative Fuels Data Center: Biodiesel Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Labeling Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Labeling Requirement Biodiesel fuel retailers may not advertise or offer for sale fuel labeled as pure biodiesel unless the fuel contains no other type of petroleum

397

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Idling of any unattended vehicle is prohibited in Utah. Violators are subject to a penalty of up to $750 and/or up to 90 days imprisonment.

398

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement On-road heavy-duty motor vehicles with a gross vehicle weight rating of 8,500 pounds or greater may not idle for more than three consecutive

399

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

400

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Vehicle operators may not idle any commercial diesel vehicle with a gross vehicle weight rating of more than 10,000 pounds for more than 10 minutes

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement All diesel-powered motor vehicles, light trucks, and equipment owned or leased by a state agency must operate using diesel fuel that contains a

402

Alternative Fuels Data Center: Ethanol Blend Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Blend Ethanol Blend Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Blend Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Blend Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Blend Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Blend Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Blend Requirement Suppliers that import gasoline for sale in North Carolina must offer fuel that is not pre-blended with fuel alcohol but that is suitable for future

403

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement School bus operators may not idle a school bus engine for more than three consecutive minutes except under the following conditions: uncontrollable

404

Alternative Fuels Data Center: Biofuels Feedstock Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Feedstock Biofuels Feedstock Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Feedstock Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Feedstock Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Feedstock Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Feedstock Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Feedstock Requirements Renewable fuel production plants operating in Louisiana and deriving ethanol from the distillation of corn must use corn crops harvested in

405

Alternative Fuels Data Center: Biofuels Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Use Biofuels Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuels Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuels Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuels Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuels Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Use Requirement State-owned diesel-powered vehicles and equipment must use a biodiesel blend that contains at least 2% biodiesel (B2), where available, as long as

406

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial motor vehicle with a gross vehicle weight rating of 10,000 pounds or more may not idle for more than 15 minutes in any 60-minute

407

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

408

Alternative Fuels Data Center: Biofuel Use Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Use Biofuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirements To reduce fossil fuel dependence and statewide greenhouse gas emissions, New Jersey state departments, agencies, offices, universities, and colleges

409

Alternative Fuels Data Center: Biodiesel Producer Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Producer Biodiesel Producer Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Producer Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Producer Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Producer Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Producer Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Producer Requirements Biodiesel is defined as a fuel that is composed of mono-alkyl esters of long-chain fatty acids derived from plant or animal matter, meets the

410

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle for more than five minutes from April through October in cities and counties where the local government has signed a

411

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A driver may not idle a vehicle on a roadway outside a business or residential district when it is practical to stop and park the vehicle. A

412

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Update to the 2002 Office of Science Networking RequirementsUpdate to the 2002 Office of Science Networking RequirementsUS Dept. of Energy, Office of Science, Advanced Scientific

2006-01-01T23:59:59.000Z

413

Efficient discrete-time simulations of continuous-time quantum query algorithms  

E-Print Network (OSTI)

The continuous-time query model is a variant of the discrete query model in which queries can be interleaved with known operations (called "driving operations") continuously in time. Interesting algorithms have been discovered in this model, such as an algorithm for evaluating nand trees more efficiently than any classical algorithm. Subsequent work has shown that there also exists an efficient algorithm for nand trees in the discrete query model; however, there is no efficient conversion known for continuous-time query algorithms for arbitrary problems. We show that any quantum algorithm in the continuous-time query model whose total query time is T can be simulated by a quantum algorithm in the discrete query model that makes O[T log(T) / log(log(T))] queries. This is the first upper bound that is independent of the driving operations (i.e., it holds even if the norm of the driving Hamiltonian is very large). A corollary is that any lower bound of T queries for a problem in the discrete-time query model immediately carries over to a lower bound of \\Omega[T log(log(T))/log (T)] in the continuous-time query model.

R. Cleve; D. Gottesman; M. Mosca; R. D. Somma; D. L. Yonge-Mallo

2008-11-26T23:59:59.000Z

414

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

requirement and guidance pages include: Sustainable Buildings and Campuses Facility Energy Intensity Reduction New Facility Construction and Major Renovation Pollution...

415

WATER REQUIREMENTS FOR A RADIOCHEMICAL PROCESSING PLANT  

SciTech Connect

A survey of the water requirements is presented for a hypothetical plant to process all the fuel from a 15,000Mwe nuclear economy. For each processing plant, specific requirements must be based on a detailed water survey which includes water quality, process requirements, and in-plant conservation plans. These considerations are discussed and the quantitative requirements are listed. (J.R.D.)

Harrington, F.E.

1962-05-28T23:59:59.000Z

416

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

417

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

418

SPECIAL ACQUISITION REQUIREMENTS ? TYPICAL ISSUES ASSOCIATED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(iii) Approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria (iv) Awarding contracts (v) Administering...

419

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

420

Integrating Security RMF with Requirements Management J ...  

Science Conference Proceedings (OSTI)

Integrating Security RMF with Requirements Management J Peeler ... Security controls at Low Risk are risk accepted & may not need mitigation. ...

2013-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Beam Time Allocation Committee (BAC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Allocation Committee (BAC) Time Allocation Committee (BAC) Charter Purpose: Allocates general user beam time by instrument to promote diverse and high- impact science and a broad-based user community to meet DOE and NSSD goals. Participants: BAC Chair (appointed by NSSD Director), Instrument Group Leaders, User Office Schedule: Tied to proposal calls - expected to meet at least 2 times/year with meetings scheduled about 6 weeks after the proposal call has closed and at least 1 month prior to scheduled operations. Process: 1. Instrument Group Leaders (with group members): a. Confirm feasibility (equipment requirements and instrument capabilities) and safe operations b. Review amount of beam time requested and adjust as needed with consideration for instrument and sample environment availability.

422

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

423

Guidelines for Mapping Requirements to Technologies  

Science Conference Proceedings (OSTI)

This report describes in a concise format the IntelliGrid methodology for determining appropriate technologies to meet a given set of system requirements for advanced metering infrastructures (AMI). The process consists of three steps: 1) map technologies to functional areas of AMI, 2) map requirements to components and, therefore, functional areas of AMI, and 3) map individual requirements to technologies.

2008-06-17T23:59:59.000Z

424

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

425

SHIELDING REQUIREMENTS FOR NSLS-II.  

Science Conference Proceedings (OSTI)

Brookhaven National Laboratory is in the process of designing a new Electron Synchrotron for scientific research using synchrotron radiation. This facility, called the 'National Synchrotron Light Source II' (NSLS-II), will provide x-ray radiation of ultra-high brightness and exceptional spatial and energy resolution. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the facility. The project scope includes the design, construction, installation, and commissioning of the following accelerators: a 200 MeV linac, a booster accelerator operating from 200 MeV to 3.0 GeV, and the storage ring which stores a maximum of 500 mA current of electrons at an energy of 3.0 GeV. It is planned to operate the facility primarily in a top-off mode, thereby maintaining the maximum variation in stored beam current to < 1%. Because of the very demanding requirements for beam emittance and synchrotron radiation brilliance, the beam life-time is expected to be low, on the order of 2-3 hours. Analysis of the bulk shielding for operating this facility and the input parameters used for this analysis are discussed in this paper. The characteristics of each of the accelerators and their operating modes are summarized with the input assumptions for the bulk shielding analysis.

JOB,P.K.; CASEY, W.R.

2008-01-02T23:59:59.000Z

426

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

427

SIENA Customer Problem Statement and Requirements  

Science Conference Proceedings (OSTI)

This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

2000-08-01T23:59:59.000Z

428

Energy Conversion of Fully Random Thermal Relaxation Times  

E-Print Network (OSTI)

Thermodynamic random processes in thermal systems are generally associated with one or several relaxation times, the inverse of which are formally homogeneous with energy. Here, we show in a precise way that the periodic modification of relaxation times during temperature-constant thermodynamic cycles can be thermodynamically beneficiary to the operator. This result holds as long as the operator who adjusts relaxation times does not attempt to control the randomness associated with relaxation times itself as a Maxwell 'demon' would do. Indirectly, our result also shows that thermal randomness appears satisfactorily described within a conventional quantum-statistical framework, and that the attempts advocated notably by Ilya Prigogine to go beyond a Hilbert space description of quantum statistics do not seem justified - at least according to the present state of our knowledge. Fundamental interpretation of randomness, either thermal or quantum mechanical, is briefly discussed.

Franois Barriquand

2005-07-26T23:59:59.000Z

429

Forecasting Electricity Demand by Time Series Models  

Science Conference Proceedings (OSTI)

Electricity demand is one of the most important variables required for estimating the amount of additional capacity required to ensure a sufficient supply of energy. Demand and technological losses forecasts can be used to control the generation and distribution of electricity more efficiently. The aim of this paper is to utilize time series model

E. Stoimenova; K. Prodanova; R. Prodanova

2007-01-01T23:59:59.000Z

430

Microsoft Word - Flash_09-04_Submission_requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 June 26, 2009 DATE: June 12, 2009 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PMCDP CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Program Certification Process Requirement Change One June 12, 2009, the Certification Review Board (CRB) identified new requirements regarding timely submission of certification packages for CRB approval. Effective immediately, in order for Level 1 and 2 packages to be eligible for certification action at the next scheduled Board meeting, packages must successfully pass the independent review and OCEM approval phases no later than two weeks prior to that upcoming Board meeting. It is strongly recommended Level 1 and 2 packages ready for CRB consideration be submitted to

431

NERSC HPC Program Requirements Review Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Published Reports Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 BER2017FinalJune7.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Biological and Environmental Research - Target 2017 NERSC-ASCR-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research NERSC-NP-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Nuclear Physics Research NERSC-FES-WorkshopReport.pdf | Adobe Acrobat PDF file

432

Bases for pump pit requirements calculations  

DOE Green Energy (OSTI)

A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.

Jacobs, R.A.

1992-02-13T23:59:59.000Z

433

Safety of magnetic fusion facilities: Requirements  

SciTech Connect

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

1996-05-01T23:59:59.000Z

434

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

435

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Follow this link to skip to the main content Facebook Flickr RSS Twitter YouTube Program Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile...

436

Partnership Requirements: ENERGY STAR Partnership for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager...

437

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

438

Electric Vehicle Charging Levels and Requirements Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and certification Safety standards and certification * Charging definitions * EVSE ( (electric vehicle supp pp y ly eq quip pment) ) examp ples * Installation requirements * Siting...

439

Exterior Lighting Requirements and COMcheck | Building Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Version Development Adoption Compliance Regulations Resource Center Exterior Lighting Requirements and COMcheck This course includes a discussion of the exterior lighting...

440

This content requires Flash - Business Cards  

This content requires Flash. To view this content, JavaScript must be enabled, and you need the latest version of the Adobe Flash Player. Download the ...

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Allocating Variability and Reserve Requirements (Presentation)  

SciTech Connect

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

442

Requirements of Magnetic Materials for Current Technological ...  

Science Conference Proceedings (OSTI)

Mar 3, 2011 ... Magnetic Materials for Energy Applications: Requirements of Magnetic ... Hard magnetic materials play a significant role in many green...

443

NERSC/DOE HPC Requirements Workshops Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational...

444

NERSC/DOE BER Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

for Biological and Environmental Research: Target 2017 A Joint ASCR BER NERSC Requirements Review September 11-12, 2012 DOE NERSC Participants and Organizers Name...

445

NERSC/DOE FES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Fusion Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for fusion energy sciences...

446

NERSC/DOE ASCR Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Logistics Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research January 5-6, 2011 Location The workshop will be held at NERSC's...

447

NERSC/DOE BES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Basic Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for high energy physics...

448

NERSC/DOE ASCR Requirements Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Agenda Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research ASCR NERSC Workshop January 5-6, 2011 >> Download and View these...

449

NERSC/DOE ASCR Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 Sort by: Default | Name |...

450

NERSC/DOE ASCR Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

Participants Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 On-Site Participants Name...

451

Cape Charles - STIP Minimum Sustainability Requirements (Virginia...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Cape Charles - STIP Minimum Sustainability Requirements (Virginia) This is the approved revision of this page, as well as...

452

Allocating Variability and Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

453

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Law and Regulation Federal agencies must meet energy management requirements outlined by Federal various statutory laws and regulations. They include: National Energy Conservation...

454

NERSC/DOE BER Requirements Meeting Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Math & Computer Science Nuclear Science Science Highlights HPC Requirements Reviews Basic Energy Sciences Fusion Energy Sciences (FES) High Energy Physics (HEP) Biological and...

455

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

456

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

457

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

458

Development Of User Needs And Functional Requirements For A Real-time Ridesharing System  

E-Print Network (OSTI)

Gender, Home & Work Phone #, Social Security #, Drivershome and work telephone numbers, address, occupation, gender, social security

Kowshik, Raghu; Gard, John; Loo, Jason; Jovanis, Paul P.; Kitamura, Ryiuichi

1993-01-01T23:59:59.000Z

459

Yield effects on bale density and time required for commercial harvesting and baling of switchgrass  

DOE Green Energy (OSTI)

The objective of this study was to obtain mowing, raking and baling data for switchgrass yields to determine whether economic projections for harvesting and baling are valid for switchgrass as an energy crop. The study demonstrated that data for haymaking cannot be extrapolated to switchgrass.

Bransby, D.; Sladden, S. [Auburn Univ., AL (United States). Dept. of Agronomy and Soils; Downing, M. [Oak Ridge National Lab., TN (United States)

1996-12-31T23:59:59.000Z

460

Reducing WWW Latency and Bandwidth Requirements by Real-Time Distillation  

E-Print Network (OSTI)

7. References Low Bandwidth Surfing in a High Bandwidth World Today's WWW is beginning to burst at the seams due to lack of bandwidth from servers to clients. Most WWW pages are designed with high-bandwidth users in mind (i.e. 10 Mbit Ethernet) , yet a large percentage of web clients are run over low-speed 28.8 or 14.4 modems, and users are increasingly considering wireless services such as cellular modems running at 4800-9600 baud. A recent study by a popular server of shareware, Jumbo, revealed that about 1 in 5 users were connecting with graphics turned off, to eliminate the annoying latency of loading web pages. This is of particular concern to corporate advertisers, who are paying for the visibility of their corporate logo. Since there is no way to optimize a single page for delivery to both high-bandwidth and low-bandwidth clients, some sites, such as [Xinside] , offer multiple versions of pages (no graphics, minimal graphics, full graphics). Most sites, however

Armando Fox; O Fox; Eric A. Brewer

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Capital requirements for the transportation of energy materials: 1979 ARC estimates. Draft final report  

SciTech Connect

This report contains TERA's estimates of capital requirements to transport natural gas, crude oil, petroleum products, and coal in the United States by 1990. The low, medium, and high world-oil-price scenarios from the EIA's Mid-range Energy Forecasting System (MEFS), as used in the 1979 Annual Report to Congress (ARC), were provided as a basis for the analysis and represent three alternative futures. TERA's approach varies by energy commodity to make best use of the information and analytical tools available. Summaries of transportation investment requirements through 1990 are given. Total investment requirements for three modes (pipelines, rails, waterways and the three energy commodities can accumulate to a $49.9 to $50.9 billion range depending on the scenario. The scenarios are distinguished primarily by the world price of oil which, given deregulation of domestic oil prices, affects US oil prices even more profoundly than in the past. The high price of oil, following the evidence of the last year, is projected to hold demand for oil below the recent past.

Not Available

1980-08-13T23:59:59.000Z

462

Building HVAC Requirements Overview Page 4-1 4 Building HVAC Requirements  

E-Print Network (OSTI)

Building HVAC Requirements ­ Overview Page 4-1 4 Building HVAC Requirements 4.1 Overview 4 conditioning (HVAC) systems. The requirements are presented in this chapter so that it may serve as a single. 2008 Residential Compliance Manual August 2009 #12;Page 4-2 Building HVAC Requirements ­ Overview 4

463

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network (OSTI)

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

464

Time and Frequency Portal  

Science Conference Proceedings (OSTI)

NIST Home > Time and Frequency Portal. Time and Frequency Portal. Programs and Projects. CODATA values of the fundamental constants ...

2013-06-27T23:59:59.000Z

465

Time Series and Forecasting  

Science Conference Proceedings (OSTI)

Time Series and Forecasting. Leigh, Stefan and Perlman, S. (1991). "An Index for Comovement of Time Sequences With ...

466

Microsoft Word - Pre-arrival requirements.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

09 09 Office of Educational Programs Student Intern Pre-Arrival Requirements In order to minimize the amount of time needed for orientation and training during the first week of you internship, you are asked to complete the following survey and on-line training requirements prior to arrival. DOE Pre-Survey: You must have your username and password to gain access. All interns are required to submit a pre-survey on line. Log onto: http://educationlink.labworks.org/ and complete before your arrival. It is strongly suggested that you print a copy and bring it with you as proof of completion just in case of an electronic error. BNL Training: You must have a BNL Guest Number to gain access. Your BNL Guest Number is indicated on the bottom of your travel letter. If it is missing, we did not

467

Automated consistency checking of requirements specifications  

Science Conference Proceedings (OSTI)

This article describes a formal analysis technique, called consistency checking, for automatic detection of errors, such as type errors, nondeterminism, missing cases, and circular definitions, in requirements specifications. The technique ... Keywords: application-independent properties, consistency checking, formal requirements modeling, software cost reduction methodology, tabular notations

Constance L. Heitmeyer; Ralph D. Jeffords; Bruce G. Labaw

1996-07-01T23:59:59.000Z

468

Designating required vs. optional input fields  

Science Conference Proceedings (OSTI)

This paper describes a study comparing different techniques for visually distingishing required from optional input fields in a form-filling application. Seven techniques were studied: no indication, bold field labels, chevrons in front of the labels, ... Keywords: data input, optional fields, required fields, visual design

Thomas S. Tullis; Ana Pons

1997-03-01T23:59:59.000Z

469

Supporting requirements engineers in recognising security issues  

Science Conference Proceedings (OSTI)

Context & motivation: More and more software projects today are security-related in one way or the other. Many environments are initially not considered security-related and no security experts are assigned. Requirements engineers often fail to recognise ... Keywords: empirical study, natural language processing, requirements analysis, secure software engineering

Eric Knauss; Siv Houmb; Kurt Schneider; Shareeful Islam; Jan Jrjens

2011-03-01T23:59:59.000Z

470

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network (OSTI)

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick Presentation to Environmental Protection Agency Uranium Contamination Radiation Protection Division (6608J requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach

471

Requirements for wireless technology on rolling stock  

Science Conference Proceedings (OSTI)

This paper gives an overview of railway specific requirements on wireless technologies and discusses the influence of different product life cycles in railway industry and communication technology. The main challenges are the heterogeneous communication ... Keywords: maintenance, passenger information, product life cycle, railway application interface, railway requirements, train operation, wireless communication

Uwe Kucharzyk

2011-03-01T23:59:59.000Z

472

Lightweight Formalisation in Support of Requirements Engineering  

Science Conference Proceedings (OSTI)

Formal design supported by automated reasoning can help keep track of requirementsa particular problem for large, detailed systems. Designers of system specifications are often constrained by codes of practice and must show not only that ... Keywords: automated reasoning, design, requirements, safety-critical systems, software engineering, specifications

Jane Hesketh; David Robertson; Norbert Fuchs; Alan Bundy

1998-04-01T23:59:59.000Z

473

Advanced Light Water Reactor utility requirements document  

SciTech Connect

The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

1986-06-01T23:59:59.000Z

474

Prediction of Power System Balancing Requirement and Tail Event  

Science Conference Proceedings (OSTI)

This paper presents a methodology for the prediction of power system balancing requirement and the probability of tail event (large imbalance between generation and load). Maintaining sufficient balancing reserves to match the difference between hourly generation schedule and real-time variable load and intermittent resources, becomes more and more challenging with the increasing penetration of intermittent energy sources. The presented methodology uses a yearly distribution and an hourly distribution of balancing requirement and tail events to provide a high level look at the issue and warn system operators of those hours when problems are most likely to occur. For real-time prediction, a Bayes Net model is constructed to model the statistical relationships between system imbalance and forecast errors, generation schedule control errors and other influential factors. The methodology will be able to provide reference information to system operators in determining the sufficiency of system balancing reserve and taking appropriate control actions.

Lu, Shuai; Makarov, Yuri V.; Brothers, Alan J.; McKinstry, Craig A.; Jin, Shuangshuang; Pease, John

2010-04-30T23:59:59.000Z

475

Time-to-Produce, Inventory, and Asset Prices  

E-Print Network (OSTI)

In a production-based general equilibrium model, I study the impact of time-to-build and time-to-produce technology constraints and inventory on asset prices and macroeconomic quantity dynamics. A time-to-build constraint captures the delay in transforming new investment into productive capital; a time-to-produce constraint captures the delay in transforming productive capital into final products. Empirically, I find that the U.S. economy in aggregate exhibits approximately a three-quarter time-to-build and a four-quarter time-to-produce constraint. These delays in the production process introduce short-run risks in the economy where inventory accumulation facilitates consumption smoothing over time. Using this structure for time-to-build and time-to-produce constraints, I numerically calibrate a production-based general equilibrium model where the representative investor has recursive preferences over consumption and inventory. The model delivers first and second moments of macroeconomic quantities and asset prices consistent with the data. A small elasticity of intertemporal substitution is necessary to positively price the short-run risks induced by the production constraints. Inventories help fit the volatilities of asset returns, while the time-to-produce feature ensures nontrivial inventory holdings. In addition, the model is able to match empirical lead-lag patterns between asset prices and macroeconomic quantities as well as observed equity return predictability.

Chen, Zhanhui

2011-08-01T23:59:59.000Z

476

Radioactive Material Transportation Requirements for the Department of Energy  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) created the National Transportation Program (NTP) whose goal is to ensure the availability of safe, efficient, and timely transportation of DOE materials. The Integration and Planning Group of the NTP, assisted by Global Technologies Incorporated (GTI), was tasked to identify requirements associated with the transport of DOE Environmental Management (EM) radiological waste/material. A systems engineering approach was used to identify source documents, extract requirements, perform a functional analysis, and set up a transportation requirements management database in RDD-100. Functions and requirements for transporting the following DOE radioactive waste/material are contained in the database: high level radioactive waste (HLW), low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW), nuclear materials (NM), spent nuclear fuel (SNF), and transuranic waste (TRU waste). The requirements will be used in the development of standard transportation protocols for DOE shipping. The protocols will then be combined into a DOE Transportation Program Management Guide, which will be used to standardize DOE transportation processes.

John, Mark Earl; Fawcett, Ricky Lee; Bolander, Thane Weston

2000-07-01T23:59:59.000Z

477

Statutory Requirements | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Statutory Requirements DOE activities surrounding building energy codes are defined by the following statutory requirements. Specific language outlining federal requirements and associated regulations are outlined below. References are also provided to individual statutes. State Building Energy Efficiency Codes Statutory Authority: Energy Conservation and Production Act (ECPA) (Pub. L. No. 94-385), as amended1 Section 304(a) of ECPA, as amended, provides that when the 1992 Model Energy Code (MEC), or any successor to that code2, is revised, the Secretary must determine, not later than 12 months after the revision, whether the revised code would improve energy efficiency in residential

478

Green Building Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Requirement Green Building Requirement Green Building Requirement < Back Eligibility Commercial Schools State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Heating Wind Program Info State District of Columbia Program Type Energy Standards for Public Buildings Provider District Department of the Environment The District of Columbia City Council enacted [http://dcclims1.dccouncil.us/images/00001/20061218152322.pdf B16-515] on December 5, 2006, establishing green building standards for public buildings and privately-owned commercial buildings of 50,000 square feet or

479

Guide to NRC reporting and recordkeeping requirements  

SciTech Connect

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the Code of Federal Regulations, Chapter I, on December 31, 1991. It also includes, in a separate section, any of those requirements that were superseded or discontinued from January through December 1991. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation.

Collins, M.; Shelton, B.

1992-11-01T23:59:59.000Z

480

Data requirements and acquisition for reservoir characterization  

Science Conference Proceedings (OSTI)

This report outlines the types of data, data sources and measurement tools required for effective reservoir characterization, the data required for specific enhanced oil recovery (EOR) processes, and a discussion on the determination of the optimum data density for reservoir characterization and reservoir modeling. The two basic sources of data for reservoir characterization are data from the specific reservoir and data from analog reservoirs, outcrops, and modern environments. Reservoir data can be divided into three broad categories: (1) rock properties (the container) and (2) fluid properties (the contents) and (3)interaction between reservoir rock and fluid. Both static and dynamic measurements are required.

Jackson, S.; Chang, Ming Ming; Tham, Min

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "holding time requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Supporting use case based requirements engineering  

E-Print Network (OSTI)

Use Cases that describe possible interactions involving a system and its environment are increasingly being accepted as effective means for functional requirements elicitation and analysis. In the current practice, informal definitions of use cases are used and the analysis process is manual. In this paper, we present an approach supported by a tool for use cases based requirements engineering. Our approach includes use cases formalization, a restricted form of natural language for use cases description, and the derivation of an executable specification as well as a simulation environment from use cases. Key words: Use cases, domain modeling, UML, requirements engineering, prototyping

Stphane S. Som

2006-01-01T23:59:59.000Z

482

Microsoft Word - Topic A Requirements _2_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Requirements A Requirements Topic A, Interconnection-Level Analysis and Planning Topic A awardees must fulfill the following requirements: 1. The work to be performed must cover the entire Interconnection. 2. Analyses and planning must be developed and performed in a transparent and collaborative manner, and the study processes must be open to participation by state and federal officials, representatives from independent system operators (ISOs) and regional transmission organizations (RTOs), utilities, and relevant stakeholder bodies or non-government organizations (NGO's), including appropriate entities in Canada and Mexico. Discuss approach to ensure consensus among stakeholders on key issues. 3. The awardee must establish a multi-constituency steering group that will provide

483

Dosimetric Benefits of Intensity-Modulated Radiotherapy Combined With the Deep-Inspiration Breath-Hold Technique in Patients With Mediastinal Hodgkin's Lymphoma  

SciTech Connect

Purpose: To assess the additional benefits of using the deep-inspiration breath-hold (DIBH) technique with intensity-modulated radiotherapy (IMRT) in terms of the protection of organs at risk for patients with mediastinal Hodgkin's disease. Methods and Materials: Patients with early-stage Hodgkin's lymphoma with mediastinal involvement were entered into the study. Two simulation computed tomography scans were performed for each patient: one using the free-breathing (FB) technique and the other using the DIBH technique with a dedicated spirometer. The clinical target volume, planning target volume (PTV), and organs at risk were determined on both computed tomography scans according to the guidelines of the European Organization for Research and Treatment of Cancer. In both cases, 30 Gy in 15 fractions was prescribed. The dosimetric parameters retrieved for the statistical analysis were PTV coverage, mean heart dose, mean coronary artery dose, mean lung dose, and lung V20. Results: There were no significant differences in PTV coverage between the two techniques (FB vs. DIBH). The mean doses delivered to the coronary arteries, heart, and lungs were significantly reduced by 15% to 20% using DIBH compared with FB, and the lung V20 was reduced by almost one third. The dose reduction to organs at risk was greater for masses in the upper part of the mediastinum. IMRT with DIBH was partially implemented in 1 patient. This combination will be extended to other patients in the near future. Conclusions: Radiation exposure of the coronary arteries, heart, and lungs in patients with mediastinal Hodgkin's lymphoma was greatly reduced using DIBH with IMRT. The greatest benefit was obtained for tumors in the upper part of the mediastinum. The possibility of a wider use in clinical practice is currently under investigation in our department.

Paumier, Amaury, E-mail: amaury.paumier@igr.fr [Department of Radiation Oncology, Institut Gustave Roussy, Villejuif (France); Ghalibafian, Mithra; Gilmore, Jennifer [Department of Radiation Oncology, Institut Gustave Roussy, Villejuif (France); Beaudre, Anne [Physics Unit, Institut Gustave Roussy, Villejuif (France); Blanchard, Pierre; El Nemr, Mohammed; Azoury, Farez; Al Hamokles, Hweej [Department of Radiation Oncology, Institut Gustave Roussy, Villejuif (France); Lefkopoulos, Dimitri [Physics Unit, Institut Gustave Roussy, Villejuif (France); Girinsky, Theodore [Department of Radiation Oncology, Institut Gustave Roussy, Villejuif (France)

2012-03-15T23:59:59.000Z

484

Part B - Requirements & Funding Information PART B - Requirements and Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b. Part B 1 b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable activity that requires an interagency agreement. This Part of the interagency agreement (IA) (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting

485

Quantifying the Reproducibility of Heart Position During Treatment and Corresponding Delivered Heart Dose in Voluntary Deep Inhalation Breath Hold for Left Breast Cancer Patients Treated With External Beam Radiotherapy  

SciTech Connect

Purpose: Voluntary deep inhalation breath hold (VDIBH) reduces heart dose during left breast irradiation. We present results of the first study performed to quantify reproducibility of breath hold using bony anatomy, heart position, and heart dose for VDIBH patients at treatment table. Methods and Materials: Data from 10 left breast cancer patients undergoing VDIBH whole-breast irradiation were analyzed. Two computed tomography (CT) scans, free breathing (FB) and VDIBH, were acquired to compare dose to critical structures. Pretreatment weekly kV orthogonal images and tangential ports were acquired. The displacement difference from spinal cord to sternum across the isocenter between coregistered planning Digitally Reconstructed Radiographs (DRRs) and kV imaging of bony thorax is a measure of breath hold reproducibility. The difference between bony coregistration and heart coregistration was the measured heart shift if the patient is aligned to bony anatomy. Results: Percentage of dose reductions from FB to VDIBH: mean heart dose (48%, SD 19%, p = 0.002), mean LAD dose (43%, SD 19%, p = 0.008), and maximum left anterior descending (LAD) dose (60%, SD 22%, p = 0.008). Average breath hold reproducibility using bony anatomy across the isocenter along the anteroposterior (AP) plane from planning to treatment is 1 (range, 0-3; SD, 1) mm. Average heart shifts with respect to bony anatomy between different breath holds are 2 {+-} 3 mm inferior, 1 {+-} 2 mm right, and 1 {+-} 3 mm posterior. Percentage dose changes from planning to delivery: mean heart dose (7%, SD 6%); mean LAD dose, ((9%, SD 7%)S, and maximum LAD dose, (11%, SD 11%) SD 11%, p = 0.008). Conclusion: We observed excellent three-dimensional bony registration between planning and pretreatment imaging. Reduced delivered dose to heart and LAD is maintained throughout VDIBH treatment.

McIntosh, Alyson; Shoushtari, Asal N.; Benedict, Stanley H.; Read, Paul W. [Department of Radiation Oncology, University of Virginia, Charlottesville, Virginia (United States); Wijesooriya, Krishni, E-mail: kw5wx@virginia.edu [Department of Radiation Oncology, University of Virginia, Charlottesville, Virginia (United States)

2011-11-15T23:59:59.000Z

486

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

487

land requirements | OpenEI Community  

Open Energy Info (EERE)

by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm...

488

Siting Requirements for Anaerobic Lagoons (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

489

Tucson- Solar Design Requirement for Homes  

Energy.gov (U.S. Department of Energy (DOE))

Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included...

490

Microsoft Word - Requirements_list.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

SELECTED LIST OF REQUIREMENTS SELECTED LIST OF REQUIREMENTS DESCRIPTION REQUIREMENT APPLICABILITY 1. Federal Motor Carrier Registration 49 CFR 390.19; 390.21 Motor carriers that conduct commercial motor vehicle operations in interstate commerce. 2. Hazardous Materials Safety Permit 49 CFR 385, Subpart E Motor carriers that transport the hazardous materials listed at 49 CFR 385.403. 3. Federal Hazardous Materials Registration 49 CFR 107, Subpart G Offering or transporting a hazardous material listed at 49 CFR 107.601. This list includes hazardous materials requiring placarding. 4. Texas State Motor Carrier Registration 43 TAC, Chap. 18, Subchap. B Motor carriers that conduct commercial motor vehicle operations in Texas. 5. Unified Carrier Registration 49 CFR 367 Motor carriers, motor private carriers, brokers, freight forwarders and leasing companies.

491

Federal Greenhouse Gas Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements Requirements Federal Greenhouse Gas Requirements October 7, 2013 - 10:02am Addthis Executive Order (E.O.) 13514 expands the energy reduction and environmental requirements of Executive Order 13423 by making greenhouse gas (GHG) management a priority for the Federal government. Under Section 2 of E.O. 13514, each Federal agency must: Within 90 days of the order, establish and report to the CEQ Chair and OMB Director a percentage reduction target for agency-wide reductions of Scope 1 and Scope 2 GHG emissions in absolute terms by fiscal year 2020 relative to a fiscal year 2008 baseline of the agency's Scope 1 greenhouse gas emissions. In establishing the target, agencies shall consider reductions associated with: Reducing agency building energy intensity Increasing agency renewable energy use and implementing on-site renewable

492

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

493

Technical requirements specification for tank waste retrieval  

Science Conference Proceedings (OSTI)

This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

Lamberd, D.L.

1996-09-26T23:59:59.000Z

494

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

for many commuters electric cars. California requires that,well suited to charging electric cars. If the solar energydrivers who dont own electric cars can feel green when they

Shoup, Donald

2012-01-01T23:59:59.000Z

495

Cook County- LEED Requirements for County Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

496

Deepwater Offshore Wind Technology Research Requirements (Poster)  

DOE Green Energy (OSTI)

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

497

Deriving Quantified Safety Requirements in Complex Systems  

Science Conference Proceedings (OSTI)

A variety of hazard analysis techniques have been proposed for software-based systems but individually the techniques are limited in their ability to cope with system complexity, or to derive and prioritise component safety requirements. There is also ...

Peter A. Lindsay; John A. McDermid; David J. Tombs

2000-10-01T23:59:59.000Z

498

Deepwater Offshore Wind Technology Research Requirements (Poster)  

SciTech Connect

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

499

Temporal Sampling Requirements for Automatic Rain Gauges  

Science Conference Proceedings (OSTI)

Automatic rain gauges are needed to obtain rainfall statistics from remote locations and platforms. Many of these platforms cannot be serviced regularly, thus requiring unattended operations for many months. At such locations there is often a ...

Jeffrey A. Nystuen

1998-12-01T23:59:59.000Z

500

NERSC/DOE FES Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Fusion Energy Sciences An FES ASCR NERSC Workshop August 3-4, 2010 Sort by: Default | Name | Date (low-high) | Date (high-low) FESNERSC Requirements Gathering Workshop August...