Powered by Deep Web Technologies
Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

History of mirror casting, figuring, segmentation and active optics  

Science Journals Connector (OSTI)

The accurate general figures for the mirrors with which one could achieve the optimum ... the beginning of the twentieth century by Karl Schwarzschild. A first design for a reflecting telescope ... dispersing len...

Lothar Noethe

2009-08-01T23:59:59.000Z

2

The Italian National Solar Energy History Project  

Science Journals Connector (OSTI)

This poster presentation introduces The Italian National Solar Energy History Project (The Project) to the participants of the ISES SWC 2007. The Project is currently being promoted by the Italian National Com...

Cesare Silvi

2009-01-01T23:59:59.000Z

3

Report. Web of Science History project  

Science Journals Connector (OSTI)

...September 2002 research-article Report. Web of Science History project J. Corden Archivist...Heritage Lottery Fund awarded 43,000 to the Web of Science History project, which was put...hosted by the Public Record Office at Kew. Web Of Science History|The Royal Society...

2002-01-01T23:59:59.000Z

4

The Manhattan Project National Security History Series  

Broader source: Energy.gov (indexed) [DOE]

The Manhattan Project National Security History Series 5 Visit our Manhattan Project web site: http://www.cfo.doe.gov/me70/manhattan/index.htm 5 DOE/MA-0002 Revised F. G. Gosling Office of History and Heritage Resources Executive Secretariat Office of Management Department of Energy January 2010 The Manhattan Project National Security History Series 5 National Security History Series Volume I: The Manhattan Project: Making the Atomic Bomb Volume II: Building the Nuclear Arsenal: Cold War Nuclear Weapons Development and Production, 1946-1989 (in progress) Volume III: Nonproliferation and Stockpile Stewardship: The Nuclear Weapons Complex in the Post-Cold War World (projected) The National Security History Series is a joint project of the Office

5

History and Organization of the Port Hacking Estuary Project  

Science Journals Connector (OSTI)

The history of research into Port Hacking before the Port Hacking Estuary Project of 19731978 is summarized....

Robert R. Parker; David J. Rochford

1983-01-01T23:59:59.000Z

6

The Manhattan Project: An Interactive History  

Office of Scientific and Technical Information (OSTI)

Leslie Groves and J. Robert Oppenheimer In a national survey at the turn of the millennium, both journalists and the public ranked the dropping of the atomic bomb and the end of the Second World War as the top news stories of the twentieth-century. The advent of nuclear weapons, made possible by the Manhattan Project, not only helped bring an end to the Second World War-it ushered in the atomic age and determined how the next war, the Cold War, would be fought. The Manhattan Project: An Interactive History is intended to provide a comprehensive overview of the Manhattan Project. Five main topical areas-Events, People, Places, Processes, and Science-are further divided into sub-sections, each with an introductory page and as many as a dozen or more sub-pages. The site is interactive in the sense that it is designed with the flexibility to meet the needs of a variety of users. Those seeking a brief overview of the Manhattan Project, for example, should start with the introductory pages for the eight sub-sections of the Events Section. Users wanting a more in-depth chronological history should read, in order, the fifty-six Events sub-pages. Numerous internal links within the content of the pages allows the reader to easily move from page to page, wherever his or her interests lead. There are thus multiple ways for the user to approach the site. In addition, the Resources Section provides access to a variety of resource materials, including photos, documents, maps, and published histories.

7

Roadmap to the Project: Oral Histories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search HREX Multimedia Related Sites Feedback Search HREX Multimedia Related Sites Feedback DOE Roadmap Experiments List Oral Histories Records Series Descriptions Overview Documents Declassified Documents Project Events ACHRE Report Uranium Miners Resources Building Public Trust Department of Defense Report Human Radiation Experiments Oral Histories Health Physicist William J. Bair, Ph.D. covers the University of Rochester's radiation biology program; Bair's radionuclide inhalation research at Hanford Site; and his management of Hanford's Biology Department and Life Sciences Program. Biochemist Waldo E. Cohn, Ph.D. covers Cohn's wartime work as Biochemistry Group leader at the University of Chicago's Metallurgical Laboratory and his tenure at Oak Ridge National Laboratory, where he helped shape America's postwar isotope production and distribution policy.

8

Provo River Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Provo River Project Power Sales Rate History Updated: 12/20/2013 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) Administrative Action 4/58 - 6/64 (Summer Season) 3.000 N.A. N.A. Administrative Action 10/58 - 4/64 (Winter Season) 4.500 N.A. N.A. Administrative Action 7/64 - 9/79 (Summer Season) 5.000 N.A. N.A. Administrative Action 10/64 - 9/79 (Winter Season) 3.000 N.A. N.A. Administrative Action 10/79 - 9/82 6.000 N.A. N.A. Administrative Action 10/82 - 9/90 6.850 N.A. N.A. Administrative Action 10/90 - 9/94 8.000 N.A. N.A. Administrative Action 10/94 - Present Installments N.A. N.A. Note: The Provo River Project sells energy only. As of October 1994, customers pay all OM&R expenses and in return, receive all the energy produced by the Project.

9

Report. Web of Science History project  

Science Journals Connector (OSTI)

...by the Public Record Office at Kew. Web Of Science History|The Royal Society|Public Record Office| 383 Notes Rec. R...Aids for the History of Science, Technology and the...through the Public Record Office site, it is possible...

2002-01-01T23:59:59.000Z

10

Recovery Act Workers Demolish Facility Tied to Project Pluto History |  

Broader source: Energy.gov (indexed) [DOE]

Recovery Act Workers Demolish Facility Tied to Project Pluto Recovery Act Workers Demolish Facility Tied to Project Pluto History Recovery Act Workers Demolish Facility Tied to Project Pluto History Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Reinvestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after workers finish installing a concrete cap over the below-ground level where the facility stood. Recovery Act Workers Demolish Facility Tied to Project Pluto History More Documents & Publications 2010 ARRA Newsletters

11

Recovery Act Workers Demolish Facility Tied to Project Pluto History |  

Broader source: Energy.gov (indexed) [DOE]

Demolish Facility Tied to Project Pluto Demolish Facility Tied to Project Pluto History Recovery Act Workers Demolish Facility Tied to Project Pluto History Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Reinvestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after workers finish installing a concrete cap over the below-ground level where the facility stood. Recovery Act Workers Demolish Facility Tied to Project Pluto History More Documents & Publications 2010 ARRA Newsletters 2011 ARRA Newsletters

12

NASA/CR2004208938 Lunar Receiving Laboratory Project History  

E-Print Network [OSTI]

NASA/CR­2004­208938 Lunar Receiving Laboratory Project History Susan Mangus Muskingum College New Concord, Ohio William Larsen Johnson Space Center Houston, Texas June 2004 #12;THE NASA STI PROGRAM OFFICE . . . IN PROFILE Since its founding, NASA has been dedicated to the advancement of aeronautics and space science

Rathbun, Julie A.

13

Microsoft Word - APRIL 2009 PMCDP Module CHRIS ESS Tutorial_MAINTAIN_PROJECT_HISTORY.doc  

Broader source: Energy.gov (indexed) [DOE]

MAINTIN PROJECT HISTORY MAINTIN PROJECT HISTORY REV: APRIL 2009 1 1. To update your project history, click on the "PMCDP Menu" and choose "Maintain project history." Maintain Project History ESS Tutorial, Project Management Career Development Program MAINTIN PROJECT HISTORY REV: APRIL 2009 2 2. A screen with the header "PMCDP Profile for [Your Name]" will appear titled "Step 3: Maintain project history." Options: Delete: This will delete all information for the selected project as currently showing in the table. Update: This will bring you back to the original input screen for project information. View Description: This will bring up a text box that will allow you to see the description previously entered. Sort: Project history information is presented in date-order, with the most recent position

14

www.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital  

E-Print Network [OSTI]

project on the history of unfree labour in the Pacific. The intern will link the database to other onlinewww.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital Humanities: The project explores the health history of indentured labourers in Fiji. The intern will digitise microfilm

Hickman, Mark

15

Supplementary Figure 1 Tract trajectory estimates and cortical projection zones for different tractography algorithms.  

E-Print Network [OSTI]

(SLF; purple) and right Arcuate Fasciculus (gold) in a candidate connectome generated using showing the cortical projection zones of the SLF. The color overlay depicts the density of fiber connectome was generated using probabilistic tractography. Right panel, SLF cortical projection zones. Nature

Cai, Long

16

Children and elders sharing stories: lessons from two online oral history projects  

Science Journals Connector (OSTI)

Oral history projects provide a way for students to learn history by engaging with elders sharing stories relevant to their experience. However, these kinds of projects require a large amount of effort to undertake. We believe computing technology can ... Keywords: children, elders, history, language arts, online community, senior citizens

Jason B. Ellis; Amy S. Bruckman; Robert C. Satterwhite

1999-12-01T23:59:59.000Z

17

Colorado River Storage Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Colorado River Storage Project Power Sales Rate History Updated: 10/2/2009 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) R4-F1 3/62 - 4/74 3.000 $1.275 6.000 UC-F1 4/74 - 6/77 3.000 $1.320 6.110 UC-F2 (Firm Only) 6/77 - 1/81 3.400 $1.340 6.550 UC-FP2 (Peaking Only) 6/77 - 1/81 N.A. $1.340 N.A. SP-F1 (Firm Only) 1/81 - 6/83 4.000 $1.655 7.890 SP-FP1 (Peaking Only) 1/81 - 6/83 N.A. $1.655 N.A. SP-F2 (Firm Only) 6/83 - 9/87 5.000 $2.090 9.920 SP-FP2 (Peaking Only) 6/83 - 9/87 N.A. $2.090 N.A. None 10/87 - Present N.A. N.A. N.A. Note: Beginning October 1, 1987, all Colorado River Storage Project power became a Salt Lake City Area Integrated Projects resource. As of that date, direct sales to power customers ceased.

18

Salt Lake City Area Integrated Projects Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Salt Lake City Area Integrated Projects Power Sales Rate History Updated: 9/11/2013 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) 1/ Composite (Mills/kWh) 2/ SLIP-F1 10/87-9/90 5.000 $2.09 9.92 - SLIP-F2 10/90-11/91 7.250 $3.08 14.5 - SLIP-F3 12/91-9/92 8.100 $3.44 16.2 - SLIP-F4 10/92-9/94 8.400 $3.54 16.72 - SLIP-F5 12/94-4/98 8.900 $3.83 - 20.17 SLIP-F6 4/98-9/02 8.100 $3.44 - 17.57 SLIP-F7 10/02-9/06 9.500 $4.04 - 20.72 SLIP-F8 10/06-9/08 10.430 $4.43 - 25.28 SLIP-F9 (First Step) 10/08-9/09 11.060 $4.70 - 26.80 SLIP-F9 (Second Step) 10/09-Present 12.190 $5.18 - 29.62 The Salt Lake City Area Integrated Projects is a combination of resources from the Collbran, CRSP, and Rio Grande Projects. 1/ Combined rates are calculated with a load factor which is assumed to be constant over a given period. In the SLCA/IP, the load factor is considered to be 58.2 percent.

19

Figure legends supplemental figures Supplemental figure 1.  

E-Print Network [OSTI]

; Kruskal-Wallis-test). Supplemental figure 3. (a) Survival of GFAPcre+/VHL+f/+f /VEGF+f/+f mice (n=19

Kleinfeld, David

20

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project  

E-Print Network [OSTI]

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project Hours · Must be enrolled UW student; work study funding accepted · Experience with Word, Excel, database To apply, submit a detailed letter of application and resume to Beth Freundlich at: History of Cartography

Wisconsin at Madison, University of

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Figure S.1  

Broader source: Energy.gov (indexed) [DOE]

2- Figures and Table 2.1 2- Figures and Table 2.1 Figure S.1 Figure 1.1 Figure 1.2 Figure 1.3 Figure 2.1 Figure 2.2 Figure 2.3 Figure 3.1 Figure 3.2 Figure 3.3 Figure 3.4 Figure 3.5 Figure 3.6 Figure 3.7 Figure 3.8 Figure 3.9 Figure 3.10 Figure 3.11 Figure 3.12 Figure 3.13 Figure 3.14 Figure 3.15 Figure 3.16 Figure 3.17 Figure 3.18 Figure 3.19 Figure 4.1 Figure 4.2 Figure 4.3 Figure 4.4 Figure 4.5 Figure 4.6 Figure 4.7 Figure 4.8 Figure 4.9 Figure 4.10 Figure 4.11 Figure 4.12 Figure 4.13 Figure 4.14 Figure 4.15 Figure 4.16 Figure 4.17 Figure 4.18 Figure 4.19 J.1 Lewiston Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC FORMAT) J.2 Keswick Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC FORMAT) J.3 Natoma Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC

22

Recovery Act Workers Demolish Facility Tied to Project Pluto History  

Broader source: Energy.gov (indexed) [DOE]

LAS VEGAS - Workers recently razed a facility used in the LAS VEGAS - Workers recently razed a facility used in the historic Project Pluto, the latest American Recovery and Rein- vestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled the last demolition waste from the Pluto Disassembly Facility to disposal facilities Jan. 11. The project is slated for completion this spring after work- ers finish installing a concrete cap over the below-ground level where the facility stood. "Without Recovery Act funding, the demolition of Pluto would not have been feasible for several more years," Federal Sub- Project Director Kevin Cabble said. In the late 1950s and early 1960s, the Pluto facility was used to develop the world's first

23

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History A repository for images about our legacy as a Laboratory. News Releases Media Contacts Videos Photos Fact Sheets Social Media PHOTOS BY TOPIC Careers Community...

24

Virtual Museum Captures Ohio Plant History: Web-based Project Preserves  

Broader source: Energy.gov (indexed) [DOE]

Virtual Museum Captures Ohio Plant History: Web-based Project Virtual Museum Captures Ohio Plant History: Web-based Project Preserves Plant's Uranium Enrichment Legacy Virtual Museum Captures Ohio Plant History: Web-based Project Preserves Plant's Uranium Enrichment Legacy May 21, 2012 - 12:00pm Addthis An online museum on the Portsmouth Gaseous Diffusion Plant went live earlier this year. An online museum on the Portsmouth Gaseous Diffusion Plant went live earlier this year. PIKETON, Ohio - Do you wonder what the interior of a uranium enrichment plant looks like without ever stepping foot in the facility? Now, the public can view photos, watch interviews with current and former workers who share historical accounts and browse old newsletters on the Portsmouth Gaseous Diffusion Plant from as far back as the early 1950s with

25

Virtual Museum Captures Ohio Plant History: Web-based Project Preserves  

Broader source: Energy.gov (indexed) [DOE]

Virtual Museum Captures Ohio Plant History: Web-based Project Virtual Museum Captures Ohio Plant History: Web-based Project Preserves Plant's Uranium Enrichment Legacy Virtual Museum Captures Ohio Plant History: Web-based Project Preserves Plant's Uranium Enrichment Legacy May 21, 2012 - 12:00pm Addthis An online museum on the Portsmouth Gaseous Diffusion Plant went live earlier this year. An online museum on the Portsmouth Gaseous Diffusion Plant went live earlier this year. PIKETON, Ohio - Do you wonder what the interior of a uranium enrichment plant looks like without ever stepping foot in the facility? Now, the public can view photos, watch interviews with current and former workers who share historical accounts and browse old newsletters on the Portsmouth Gaseous Diffusion Plant from as far back as the early 1950s with

26

Margaret A. Ormsby Oral History Project Compiled by Christopher Hives (1999)  

E-Print Network [OSTI]

Margaret A. Ormsby Oral History Project fonds Compiled by Christopher Hives (1999) University Alphabetically by Interviewee 1-6 #1 John Bovey (April 9, 1999) - 2 tapes 1-7 #2 Keith Ralston (May 4, 1999) 1 Marcellus (May 11, 1999) 1-10 #5 Lewis G. Thomas (May 12, 1999) 1-11 #6 Keith Ralston (May 12, 1999) 1-12 #7

Handy, Todd C.

27

history  

National Nuclear Security Administration (NNSA)

highlights of the site's history now is available for viewing on the Y-12 public Web site at

28

Graffiti (Figural)  

E-Print Network [OSTI]

2004 Middle Egyptian Quarries Project: 2004 field season.flat space available. In quarries and in way-stops onwith further study is the quarry of Abdel Qurna just north

Cruz-Uribe, Eugene

2008-01-01T23:59:59.000Z

29

Project Team Elizabeth Rodini, Lecturer, Department of the History of Art, Krieger School of Arts & Sciences; Nora  

E-Print Network [OSTI]

Project Team Elizabeth Rodini, Lecturer, Department of the History of Art, Krieger School of Arts study, such as how collections are organized in a space, the history of collections through time in their architectural, historical, and narrative complexities. This "museum database" addresses several pedagogical

Gray, Jeffrey J.

30

Biaxial Interference Figures  

Science Journals Connector (OSTI)

Biaxial interference figures are similar to uniaxial figures but show more variety in the shape and movement of isogyres. Biaxial figures often contain only a single isogyre, which is not always parallel to a ...

Richard E. Stoiber; Stearns A. Morse

1994-01-01T23:59:59.000Z

31

Using ecological and life-history characteristics for projecting species' responses to climate change  

E-Print Network [OSTI]

were used to project sensitiv- ity to climate change basedapproach to project spe- cies responses to climate warmingclimate change cal research: experiences and legacy of the ALARM project.

Pompe, Sven; Hanspach, Jan; Badeck, Franz W.; Klotz, Stefan; Bruelheide, Helge; Khn, Ingolf

2014-01-01T23:59:59.000Z

32

Weathering and aggregate suitabilityA case history from the Victoria project, Sri Lanka  

Science Journals Connector (OSTI)

The Victoria Project under construction near Kandy in Sri Lanka, required 1.7 million tonnes of aggregate to be quarried in slightly weathered gneiss. This paper describes an investigation into the strength an...

C. Stevens

1984-06-01T23:59:59.000Z

33

MECS Fuel Oil Figures  

U.S. Energy Information Administration (EIA) Indexed Site

: Percentage of Total Purchased Fuels by Type of Fuel : Percentage of Total Purchased Fuels by Type of Fuel Figure 1. Percent of Total Purchased Fuel Sources: Energy Information Administration. Office of Energy Markets and End Use, Manufacturing Energy Consumption Survey (MECS): Consumption of Energy; U.S. Department of Commerce, Bureau of the Census, Annual Survey of Manufactures (ASM): Statistics for Industry Groups and Industries: Statistical Abstract of the United States. Note: The years below the line on the "X" Axis are interpolated data--not directly from the Manufacturing Energy Consumption Survey or the Annual Survey of Manufactures. Figure 2: Changes in the Ratios of Distillate Fuel Oil to Natural Gas Figure 2. Changes in the Ratios of Distillate Fuel Oil to Natural Gas Sources: Energy Information Administration. Office of

34

Manhattan Project buildings and facilities at the Hanford Site: A construction history  

SciTech Connect (OSTI)

This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

Gerber, M.S.

1993-09-01T23:59:59.000Z

35

OIL & GAS HISTORY 1 History in California  

E-Print Network [OSTI]

OIL & GAS HISTORY 1 History in California 4 Superior figures refer to references at the end of the essay. OIL AND GAS PRODUCTION California oil was always a valued commodity. When the Spanish explorers landed in California in the 1500s, they found Indians gathering asphaltum (very thick oil) from natural

36

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

37

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

38

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

39

Engineered materials characterization report for the Yucca Mountain Site Characterization Project. Volume 1, Introduction, history, and current candidates  

SciTech Connect (OSTI)

The purpose of the Yucca Mountain Site Characterization Project is to evaluate Yucca Mountain for its suitability as a potential site for the nation`s first high-level nuclear waste repository. As part of this effort, Lawrence Livermore National Laboratory (LLNL) has been occupied for a number of years with developing and evaluating the performance of waste packages for the potential repository. In recent years this work has been carried out under the guidance of and in collaboration with the Management and Operating contractor for the Civilian Radioactive Waste Management System, TRW Environmental Safety Systems, Inc., which in turn reports to the Office of Civilian Radioactive Waste Management of the US Department of Energy. This report summarizes the history of the selection and characterization of materials to be used in the engineered barrier system for the potential repository at Yucca Mountain, describes the current candidate materials, presents a compilation of their properties, and summarizes available corrosion data and modeling. The term ``engineered materials`` is intended to distinguish those materials that are used as part of the engineered barrier system from the natural, geologic materials of the site.

Van Konynenburg, R.A.; McCright, R.D.; Roy, A.K.; Jones, D.A.

1995-08-01T23:59:59.000Z

40

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

42

SPEAR History | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SPEAR History SPEAR History Experimental Facilities : The SPEAR Storage Ring Stanford University has a long history of involvement in the development and use of colliding-beam storage rings for particle physics research. The first such machine at Stanford was a small electron-electron collider, shaped like a figure eight, located on the main campus. A collaborative effort between physicists from Princeton and Stanford Universities, this project produced the first physics results ever obtained with the colliding-beam technique. Stanford Positron Electron Accelerating Ring The next in the succession of Stanford colliders was the SPEAR (Stanford Positron Electron Accelerating Ring) machine at SLAC, completed in 1972. SPEAR consists of a single ring some 80 meters in diameter, in which counter-rotating beams of electrons

43

Annual Energy Outlook 2006 with Projections to 2030  

Gasoline and Diesel Fuel Update (EIA)

AEO Graphic Data AEO Graphic Data Annual Energy Outlook 2006 with Projections to 2030 Figure 1. Energy Prices, 1980-2030 Figure 1 Data Figure 2. Delivered Energy Consumption by Sector Figure 2 Data Figure 3. Energy Consumption by Fuel, 1980-2030 Figure 3 Data Figure 4. Energy Use Per Capita and Per Dollar of Gross Domestic Product, 1980-2030 Figure 4 Data Figure 5. Electricity Generation by Fuel, 1980-2030 Figure 5 Data Figure 6. Total Energy Production and Consumption, 1980-2030 Figure 6 Data Figure 7. Energy Production by Fuel, 1980-2030 Figure 7 Data Figure 8. Projected U.S. Carbon Dioxide Emissions by Sector and Fuel, 1990-2030 Figure 8 Data Figure 9. Sulfur Dioxide Emissions in Selected States, 1980-2003 Figure 9 Data Figure 10. World Oil Prices in the AEO2005 and AEO 2006 Reference Cases Figure 10 Data

44

History - Cyclotron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History Lawrence's original Cyclotron, for which he received a patent and the Nobel Prize. Lawrence's original cyclotron design was limited to energies where relativistic effects were not important. The third generation cyclotron included "sector-focusing" to allow higher energies to be obtained. The 88-Inch Cyclotron was based on Lawrence's design of a sector-focused cyclotron for the MTA project at Livermore. 1500 man-hours of work were necessary to assemble the trim coils which help regulate the strength and shape of the accelerator's magnetic field. Discussing the cyclotron magnet (seen in the background) are Dr. Elmer Kelly, physicist in charge of the 88-Inch Cyclotron and Warren Dexter, electrical coordinator for the cyclotron project.

45

Archives and History Office: Oral History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oral History Oral History Oral History Oral History interviews with SLAC staff and users have been conducted at SLAC and at other institutions by SLAC Archives and History Office staff and by others interested in the history of physics and computing. Information collected in these interviews supplements original correspondence and other primary source materials collected by the Archives and History Office. SLAC Interviews Interviews have been conducted by SLAC staff on an irregular basis, as resources have permitted. The Archives and History Office staff are currently working on a project to identify all past interview subjects, locate interview tapes and permission forms, and create interview transcripts. Our holdings contain tapes or transcripts of interviews with the following staff members and users:

46

Oil Quantity : The histori  

E-Print Network [OSTI]

model for Prudhoe Bay. Figure 11: Historical Prudhoe Bay oil production data, modeled economically Production (million bbl per Month) Historical Production Best Fit (Hist. Tax w/ELF, Ref. P) High Price 120 140 160 19 Oil Quantity Con Wel N E A N N ng Results e Bay : The histori Bay over tim : Prudhoe Ba

Lin, C.-Y. Cynthia

47

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

48

Annual Energy Outlook 2010 with Projections to 2035-Graphic Data  

Gasoline and Diesel Fuel Update (EIA)

Annual Energy Outlook 2010 with Projections to 2035 - Graphic Data Annual Energy Outlook 2010 with Projections to 2035 - Graphic Data Annual Energy Outlook 2010 with Projections to 2035 Graphic Data Figure 1. U.S. primary energy consumption, 1980-2035 Figure 1 Data Figure 2. U.S. liquid fuels supply, 1970-2035 Figure 2 Data Figure 3. U.S. natural gas supply, 1990-2035 Figure 3 Data Figure 4. U.S. energy-related carbon dioxide emissions, 2008 and 2035 Figure 4 Data Figure 5. Projected average fleet-wide fuel economy and CO2-equivalent emissions compliance levels for passenger cars, model year 2016 Figure 5 Data Figure 6. Projected average fleet-wide fuel economy and CO2-equivalent emissions compliance levels for light trucks, model year 2016 Figure 6 Data Figure 7. Total energy consumption in three cases, 2005-2035 Figure 7 Data

49

The synthesis of sound figures  

Science Journals Connector (OSTI)

In this paper we discuss a novel technique to control the spatial distribution of sound level within a synthesized sound field. The problem is formulated by separating the sound field into regions with high acoustic level, so-called bright regions, and ... Keywords: Multichannel sound reproduction, Quiet zones, Sound field synthesis, Sound figures

Karim Helwani; Sascha Spors; Herbert Buchner

2014-04-01T23:59:59.000Z

50

ORISE: History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History The Oak Ridge Institute for Science and Education (ORISE) is a national leader in science education and research, with programs dating back to 1946 and having served as an official U.S. Department of Energy (DOE) institute since 1992. The institute that eventually became what is known today as ORISE was the brainchild of University of Tennessee (UT) physics professor Dr. William G. Pollard. Aware of the valuable assets on hand in Oak Ridge, Tenn., as part of the Manhattan Project, Pollard talked about the possibility of aligning regional universities with the scientific resources and state-of-the-art equipment in Oak Ridge. On Oct. 17, 1946, Pollard's vision became a reality when the Oak Ridge Institute of Nuclear Studies (ORINS) received a charter of incorporation

51

BILIWG: Consistent "Figures of Merit" (Presentation)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BILIWG: Consistent "Figures of Merit" BILIWG: Consistent "Figures of Merit" A finite set of results reported in consistent units * To track progress of individual projects on a consistent basis * To enable comparing projects in a transparent manner Potential BILIWG Figures of Merit Key BILI Distributed Reforming Targets * Cost ($/kg of H2): H2A analysis - Distributed reforming station,1000 kg/day ave./daily dispensed, 5000/6250 psi (and 10,000/12,000 psi) dispensing, 500 units/yr. * nth unit vs. 500 units/yr ? * production unit only (with 300 psi outlet pressure) ? * Production unit efficiency: LHV H2 out/(LHV of feedstocks and all other energy in) GTG - WTG efficiency? - Feedstock conversion energy efficiency? * Production unit capital cost: Distributed reforming station,1000 kg/day ave./daily dispensed, 300 psi outlet pressure

52

EIS-0268-Figures-1997.pdf  

Broader source: Energy.gov (indexed) [DOE]

DOFJ'EIS-0268 DOFJ'EIS-0268 - PKw.2F Figure 4-L L-Lake and environs. 4-3 -- =----- 90 --m--- -m- EAST o (C.nti""ed O"figure 4.4b) AA 320 1 300 1 Fourmile Indian Grave Upland Pen Branch Brench Formation Branch 280 ~ 280 240 : E -220 ~ L 200 180 I 160 140 1 I I 1 2 3 4 5 Miles Legend: _ _ Inferredcontact Note:TO converito kilometersmultiply by 1.609 to convetito metersmultiply by0.304e Figure 4-4a. Generalized geologic cross section from Fourmile Branch to L DO~IS-0268 I t" 1 I I t 4-8 DOE/EIS-0268 I 4-60 I t t i I I DOE/EIS-0268 ,. ,. 4-61 DOE/EIS-0268 ,. ,,.':, .. ,.. , 4-62 I 1 I I I DOE/EIS-0268 4-63 DOEI'EIS-0268 ., . . 4-64 I I 1 B I I I m 1 I I I I 1 I I I m I DOE~IS-0268 4-65 DO~IS-0268 Radon in homes: 200 millirem per year Notes me major contributor to the annual average individual dose in the United StaIeS, [ncluti"g residents of the Central Savannah River Area, is naturally occuning radiation

53

Annual Energy Outlook 2009 with Projections to 2030-Graphic Data  

Gasoline and Diesel Fuel Update (EIA)

Annual Energy Outlook 2009 with Projections to 2030 Annual Energy Outlook 2009 with Projections to 2030 Annual Energy Outlook 2009 with Projections to 2030 Graphic Data Figure 1. Total liquid fuels demand by sector Figure 1 Data Figure 2. Total natural gas supply by source Figure 2 Data Figure 3. New light-duty vehicle sales shares by type Figure 3 Data Figure 4. Proposed CAFE standards for passenger cars by vehicle footprint, model years 2011-2015 Figure 4 Data Figure 5. Proposed CAFE standards for light trucks by vehicle footprint, model years 2011-2015 Figure 5 Data Figure 6. Average fuel economy of new light-duty vehicles in the AEO2008 and AEO2009 projections, 1995-2030 Figure 6 Data Figure 7. Value of fuel saved by a PHEV compared with a conventional ICE vehicle over the life of the vehicles, by gasoline price and PHEV all-electric driving range

54

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

55

Microsoft Word - figure_20.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 0 2 4 6 8 10 12 14 16 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2005 dollars using the chain-type price indexes for Gross Domestic Product (2005 = 1.0) as published by the U.S. Department of Commerce, Bureau of Economic Analysis. dollars per thousand cubic feet base year Figure 21. Average price of natural gas delivered to residential consumers, 1980-2011 nominal dollars

56

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

38 38 0 2 4 6 8 10 2002 2003 2004 2005 2006 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-906, "Power Plant Report." Figure 15. Natural Gas Delivered to Consumers in the United States, 2002-2006 Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2002 through 2006. EIA collects information on the number of residential and commercial consumers through a survey of companies that deliver gas

57

Microsoft Word - figure_18.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 12 14 2001 2002 2003 2004 2005 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 400 440 Dollars per Thousand Cubic Meters Residential Commercial Industrial Electric Power Vehicle Fuel Figure 18. Average Price of Natural Gas Delivered to Consumers in the United States, 2001-2005 Note: Coverage for prices varies by consumer sector. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC), Form FERC-423, "Monthly Report of Cost and Quality of Fuels for

58

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2007 (Million Cubic Feet) Nigeria Algeria 37,483 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Algeria Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and the Office of Fossil Energy, Natural Gas Imports and Exports.

59

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 2003 2004 2005 2006 2007 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; and Form EIA-923, "Power Plant Operations Report." Figure 15. Natural Gas Delivered to Consumers in the United States, 2003-2007 Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2003 through 2007.

60

PHOBOS Experiment: Figures and Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

PHOBOS consists of many silicon detectors surrounding the interaction region. With these detectors physicists can count the total number of produced particles and study the angular distributions of all the products. Physicists know from other branches of physics that a characteristic of phase transitions are fluctuations in physical observables. With the PHOBOS array they look for unusual events or fluctuations in the number of particles and angular distribution. The articles that have appeared in refereed science journals are listed here with separate links to the supporting data plots, figures, and tables of numeric data. See also supporting data for articles in technical journals at http://www.phobos.bnl.gov/Publications/Technical/phobos_technical_publications.htm and from conference proceedings at http://www.phobos.bnl.gov/Publications/Proceedings/phobos_proceedings_publications.htm

The PHOBOS Collaboration

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

38 38 0 2 4 6 8 10 2001 2002 2003 2004 2005 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Figure 15. Natural Gas Delivered to Consumers in the United States, 2001-2005 Sources: Energy Information Administration (EIA), Form EIA -176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-906, "Power Plant Report." Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2001 through 2005. EIA collects information on the number of residential and commercial consumers through a survey of companies that deliver gas

62

Evaluation of the Life History of Native Salmonids in the Malheur River Basin; Cooperative Bull Trout/Redband Trout Research Project, 2002-2003 Annual Report.  

SciTech Connect (OSTI)

The Malheur River is a 306-kilometer tributary to the Snake River, which drains 12,950 square kilometers. The Malheur River originates in the Blue Mountains and flows into the Snake River near Ontario, Oregon. The climate of the basin is characterized by hot dry summers, occasionally exceeding 38 C, and cold winters that may drop below -29 C. Average annual precipitation is 30 centimeters in the lower reaches. Wooded areas consist primarily of mixed fir and pine forest in the higher elevations. Sagebrush and grass communities dominate the flora in the lower elevations. Efforts to document salmonid life histories, water quality, and habitat conditions have continued in fiscal year 2002. Bull trout Salvelinus confluentus are considered to be cold water species and are temperature-dependant. Due to the interest of bull trout from various state and Federal agencies, a workgroup was formed to develop project objectives related to bull trout. Table 1 lists individuals that participated in the 2002 work group. This report will reflect work completed during the Bonneville Power Administration contract period starting April 1, 2002, and ending March 31, 2003. All tasks were conducted within this timeframe, and a more detailed timeframe may be referred to in each individual report.

Miller, Alan; Soupir, Jim (US Forest Service, Prairie City Ranger District, Prairie City, OR); Schwabe, Lawrence (Burns Paiute Tribe, Department of Fish and Wildlife, Burns, OR)

2003-08-01T23:59:59.000Z

63

Beam History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beam History Print Beamline History Request Form To request a beam current histograph from the ALS storage ring beam histograph database, select the year, month, and day, then...

64

Beam History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beam Status Beam History Print Beamline History Request Form To request a beam current histograph from the ALS storage ring beam histograph database, select the year, month, and...

65

History | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About Energy.gov » History About Energy.gov » History History History The Department of Energy has one of the richest and most diverse histories in the Federal Government. Although only in existence since 1977, the Department traces its lineage to the Manhattan Project effort to develop the atomic bomb during World War II and to the various energy-related programs that previously had been dispersed throughout various Federal agencies. The Department has made available to researchers and the general public a rich variety of materials and information: Historical Resources, including published and online histories of the Department and its predecessor agencies and information on records, exhibits, museums, and tours available online and at various locations both within and outside the Department. Major publications and websites can be

66

History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About Energy.gov » History About Energy.gov » History History History The Department of Energy has one of the richest and most diverse histories in the Federal Government. Although only in existence since 1977, the Department traces its lineage to the Manhattan Project effort to develop the atomic bomb during World War II and to the various energy-related programs that previously had been dispersed throughout various Federal agencies. The Department has made available to researchers and the general public a rich variety of materials and information: Historical Resources, including published and online histories of the Department and its predecessor agencies and information on records, exhibits, museums, and tours available online and at various locations both within and outside the Department. Major publications and websites can be

67

Annual Energy Outlook 2006 with Projections to 2030 - Overview  

Gasoline and Diesel Fuel Update (EIA)

Energy Demand Energy Demand Annual Energy Outlook 2006 with Projections to 2030 Average Energy Use per Person Increases Through 2030 Figure 31. Energy use per capita and per dollar of gross domestic product, 1980-2030 (index, 1980 = 1). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Population growth is a key determinant of total energy consumption, closely linked to rising demand for housing, services, and travel. Energy consumption per capita, controlling for population growth, shows the combined effect of other factors, such as economic growth and technology improvement. In the AEO2006 reference case, energy consumption per capita grows faster than it has in recent history (Figure 31), as a result of continued growth in disposable income.

68

Evaluation of the Life History of Native Salmonids in the Malheur River Basin; Cooperative Bull Trout/Redband Trout Research Project, 2000-2001 Annual Report.  

SciTech Connect (OSTI)

The Malheur basin lies within southeastern Oregon. The Malheur River is a tributary to the Snake River, entering at about River Kilometer (RK) 595. The hydrological drainage area of the Malheur River is approximately 12,950 km{sup 2} and is roughly 306 km in length. The headwaters of the Malheur River originate in the Blue Mountains at elevations of 6,500 to 7,500 feet, and drops to an elevation of 2000 feet at the confluence with the Snake River near Ontario, Oregon. The climate of the Malheur basin is characterized by hot dry summers, occasionally exceeding 38 C and cold winters that may drop below -29 C. Average annual precipitation is 300 centimeters and ranges from 100 centimeters in the upper mountains to less than 25 centimeters in the lower reaches (Gonzalez 1999). Wooded areas consist primarily of mixed fir and pine forest in the higher elevations. Sagebrush and grass communities dominate the flora in the lower elevations. Efforts to document salmonid life histories, water quality, and habitat conditions have continued in fiscal year 2000. The Burns Paiute Tribe (BPT), United States Forest Service (USFS), and Oregon Department of Fish and Wildlife (ODFW), have been working cooperatively to achieve this common goal. Bull trout ''Salvenlinus confluentus'' have specific environmental requirements and complex life histories making them especially susceptible to human activities that alter their habitat (Howell and Buchanan 1992). Bull trout are considered to be a cold-water species and are temperature dependent. This presents a challenge for managers, biologists, and private landowners in the Malheur basin. Because of the listing of bull trout under the Endangered Species Act as threatened and the current health of the landscape, a workgroup was formed to develop project objectives related to bull trout. This report will reflect work completed during the Bonneville Power contract period starting 1 April 2000 and ending 31 March 2001. The study area will include the North Fork Malheur River and the Upper Malheur River from Warm Springs Reservoir upstream to the headwaters.

Gonzales, Dan; Schwabe, Lawrence; Wenick, Jess (Burns Paiute Tribe, Department of Fish and Wildlife, Burns, OR)

2001-08-01T23:59:59.000Z

69

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

,833 ,833 35 Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2009 (Million Cubic Feet) Norway Trinidad/ Tobago Trinidad/ Tobago Egypt Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 111,144 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates

70

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 2010 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 26.8 0.8 0.2 3.4 3.280 0.190 0.042 0.333 0.739 0.033 21.3 1.1 3.3 3.3 2.0 3.1 6.5 0.03 7.4 0.073 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

71

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 2009 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 26.0 0.7 0.2 3.5 3.271 0.236 0.013 0.338 0.701 0.031 20.6 1.0 3.4 3.0 1.9 3.1 6.2 0.03 6.9 0.160 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

72

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Algeria Figure 2. Natural Gas Supply and Disposition in the United States, 2007 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 24.6 0.6 0.2 3.8 3.783 0.448 0.077 0.095 0.292 0.482 0.047 19.1 0.9 3.2 3.4 1.8 3.0 6.6 0.03 6.8 0.115 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895A, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

73

Microsoft Word - figure_14.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 14. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2010 (Million Cubic Feet) Norway India Trinidad/ Tobago Egypt Yemen Japan Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 53,122 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada Gulf of Mexico Canada Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates based on historical data. Energy Information

74

Microsoft Word - figure_17.doc  

Gasoline and Diesel Fuel Update (EIA)

5 5 C ommercial All O ther States W isconsin Minnesota Pennsylvania Michigan O hio N ew Jersey Texas California N ew York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Residential Indiana G eorgia N ew Jersey Pennsylvania Texas O hio Michigan Illinois California All O ther States N ew York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Figure 17. Natural Gas Delivered to Consumers in the United States, 2010 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet E lectric P ower 7,387,184 34% Industrial 6,517,477 30% C om m ercial 3,101,675 14% R esidential 4,787,320 22% Industrial All O ther States Minnesota Iowa Pennsylvania O klahoma Illinois O hio Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 E lectric Power All O ther States Arizona Mississippi Louisiana Alabama

75

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Texas Ohio New Jersey Michigan California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Wisconsin Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2008 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,668,379 31% Industrial 6,650,276 31% Commercial 3,135,852 15% Residential 4,872,107 23% Industrial All Other States Georgia Iow a Oklahom a Pennsylvania Illinois Indiana Ohio Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power All Other States Mississippi New Jersey Louisiana

76

Microsoft Word - figure_17.doc  

Gasoline and Diesel Fuel Update (EIA)

3 3 Commercial All Other States Wisconsin M innesota Pennsylvania Ohio M ichigan Texas New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Residential Colorado Indiana Texas New Jersey Pennsylvania Ohio M ichigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Figure 18. Natural gas delivered to consumers in the United States, 2011 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Residential 4,713,695 21% Commercial 3,153,605 14% Industrial 6,904,843 31% Electric Power 7,573,863 34% Industrial All Other States M innesota Iowa Oklahoma Pennsylvania Ohio Illinois Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power

77

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Ohio Texas Michigan New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Wisconsin Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2007 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,841,408 33% Industrial 6,624,846 31% Commercial 3,017,105 14% Residential 4,717,311 22% Industrial All Other States Georgia Oklahom a Michigan Pennsylvania Illinois Indiana Ohio Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Electric Power All Other States Alabam a

78

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 20088 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 25.8 0.7 0.2 3.6 3.589 0.267 0.012 0.365 0.590 0.050 20.3 1.0 3.4 3.4 1.9 3.1 6.7 0.03 6.7 0.055 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

79

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Egypt Algeria Figure 2. Natural Gas Supply and Disposition in the United States, 2006 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 23.5 0.7 0.1 3.3 3.590 0.389 0.017 0.057 0.322 0.341 0.061 18.5 0.9 3.0 2.5 1.7 4.4 2.8 6.5 0.02 6.2 0.120 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895A, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Form EIA-816, "Monthly Natural Gas Liquids

80

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2008 (Million Cubic Feet) Norway Trinidad/ Tobago Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 45,772 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates.

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Ohio Michigan Texas New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Minnesota Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2009 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,872,049 33% Industrial 6,167,193 29% Commercial 3,118,833 15% Residential 4,778,478 23% Industrial All Other States Georgia Iow a Pennsylvania Oklahom a Ohio Illinois Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power All Other States Nevada Pennsylvania Alabam a Arizona

82

History Overview of Solid-State Lighting - History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Condensed History of Lighting | Review Articles | FAQs | Condensed History of Lighting | Review Articles | FAQs | Documents Archive | CONDENSED HISTORY OF LIGHTING Figure courtesy of Jeff Tsao; a version of this figure was published in IEEE Circuits and Devices Vol 20, No 3, pp 28-37, May/June, 2004 Lighting technologies are substitutes for sunlight in the 425-675 nm spectral region where sunlight is most concentrated and to which the human eye has evolved to be most sensitive. The history of lighting can be viewed as the development of increasingly efficient technologies for creating visible light inside, but not wasted light outside, of that spectral region. A 200-year perspective on that history is shown in the figure above. The left axis indicates luminous efficacy, in units of lumens (a measure of light which factors in the human visual response to various wavelengths) per watt. The right axis indicates the corresponding power-conversion efficiency for a tri-LED tri-color white light source with moderate color rendering (CRI=80) and relatively warm color temperature (CCT=3900K). For such a source, 400lm/W would correspond to 100% power-conversion efficiency.

83

Microsoft Word - Figure_15_2014.docx  

U.S. Energy Information Administration (EIA) Indexed Site

Source: Energy Information Administration (EIA), Form EIA-191M, "Monthly Underground Gas Storage Report." U.S. Energy Information Administration | Natural Gas Annual Figure 15....

84

Toto the Robot Figure 1. Toto, front view. Figure 2. Toto, rear view.  

E-Print Network [OSTI]

Toto the Robot Figure 1. Toto, front view. Figure 2. Toto, rear view. Toto the Robot was created so in the back to allow the tape- recorder to be held inside, and the figure was spray-painted. With his metallic a robot, helps account for his lack of verbal charm. Second, some younger children may recognize in Toto

Indiana University

85

THE ACS LCID PROJECT. VI. THE STAR FORMATION HISTORY OF THE TUCANA dSph AND THE RELATIVE AGES OF THE ISOLATED dSph GALAXIES  

SciTech Connect (OSTI)

We present a detailed study of the star formation history (SFH) of the Tucana dwarf spheroidal galaxy. High-quality, deep HST/ACS data, collected in the framework of the LCID project, allowed us to obtain the deepest color-magnitude diagram to date, reaching the old main-sequence turnoff (F814 {approx} 29) with good photometric accuracy. Our analysis, based on three different SFH codes, shows that Tucana is an old and metal-poor stellar system, which experienced a strong initial burst of star formation at a very early epoch ({approx_equal}13 Gyr ago) which lasted a maximum of 1 Gyr (sigma value). We are not able to unambiguously answer the question of whether most star formation in Tucana occurred before or after the end of the reionization era, and we analyze alternative scenarios that may explain the transformation of Tucana from a gas-rich galaxy into a dSph. Current measurements of its radial velocity do not preclude that Tucana may have crossed the inner regions of the Local Group (LG) once, and so gas stripping by ram pressure and tides due to a close interaction cannot be ruled out. A single pericenter passage would generate insufficient tidal heating to turn an originally disky dwarf into a true dSph; however, this possibility would be consistent with the observed residual rotation in Tucana. On the other hand, the high star formation rate measured at early times may have injected enough energy into the interstellar medium to blow out a significant fraction of the initial gas content. Gas that is heated but not blown out would also be more easily stripped via ram pressure. We compare the SFH inferred for Tucana with that of Cetus, the other isolated LG dSph galaxy in the LCID sample. We show that the formation time of the bulk of star formation in Cetus is clearly delayed with respect to that of Tucana. This reinforces the conclusion of Monelli et al. that Cetus formed the vast majority of its stars after the end of the reionization era implying, therefore, that small dwarf galaxies are not necessarily strongly affected by reionization, in agreement with many state-of-the-art cosmological models.

Monelli, M.; Gallart, C.; Hidalgo, S. L.; Aparicio, A.; Drozdovsky, I., E-mail: monelli@iac.e [Instituto de Astrofisica de Canarias, La Laguna, Tenerife (Spain)

2010-10-20T23:59:59.000Z

86

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

87

Microsoft Word - Figure_03_04.doc  

U.S. Energy Information Administration (EIA) Indexed Site

8 8 0 2 4 6 8 10 12 14 16 18 20 22 2010 2011 2012 2013 2014 Residential Commercial Industrial Electric Power Citygate dollars per thousand cubic feet Figure 3 and 4 0 2 4 6 8 10 12 14 16 18 20 22 2010 2011 2012 2013 2014 NGPL Composite Spot Price NG Spot Price at Henry Hub dollars per thousand c ubic feet Note: Prices are in nominal dollars. Source: Table 3. Figure 3. Average citygate and consumer prices of natural gas in the United States, 2010-2013 Figure 4. Spot prices of natural gas and natural gas plant liquids in the United States, 2010-2013

88

RELEVANT SPECTROSCOPIC DATA Figure A.1: 1  

E-Print Network [OSTI]

, 25°C, 499.85 MHz) of 1iPr Figure A.12: 1 H NMR Spectrum (C6D6, 70°C, 499.85 MHz) of 1iPr Figure A.13: 13 C{1 H} NMR Spectrum (C6D6, 25°C, 125.70 MHz) of 1iPr #12;228 Figure A.14: 31 P{1 H} NMR Spectrum (C6D6, 25°C, 121.48 MHz) of 1iPr #12;229 Figure A.15: 1 H-13 C HSQC NMR Spectrum (C6D6, 25°C, 499

Winfree, Erik

89

EIA - AEO2010 - Coal projections  

Gasoline and Diesel Fuel Update (EIA)

Coal Projections Coal Projections Annual Energy Outlook 2010 with Projections to 2035 Coal Projections Figure 88. Coal production by region, 1970-2035 Click to enlarge » Figure source and data excel logo Figure 89. U.S. coal production in six cases, 2008, 2020, and 2035 Click to enlarge » Figure source and data excel logo Figure 90. Average annual minemouth coal prices by region, 1990-2035 Click to enlarge » Figure source and data excel logo Figure 91. Average annual delivered coal prices in four cases, 1990-2035 Click to enlarge » Figure source and data excel logo Figure 92. Change in U.S. coal consumption by end use in two cases, 2008-2035 Click to enlarge » Figure source and data excel logo Coal production increases at a slower rate than in the past In the AEO2010 Reference case, increasing coal use for electricity generation, along with the startup of several CTL plants, leads to growth in coal production averaging 0.2 percent per year from 2008 to 2035. This is significantly less than the 0.9-percent average growth rate for U.S. coal production from 1980 to 2008.

90

EIS-0023-FEIS-Figures-1979.pdf  

Broader source: Energy.gov (indexed) [DOE]

NORTM NORTM CAROLINA 2 -- r /'- 3Charlo,te Gree,v:; I, o s. \ '~ ( % SOUTH CAROLINA ".4 o " .Alkenoco'"mb'a A1l.a,to \ August. ( SRP O Macon \ GEORGIA ? Charleston 50 MI ".* / 100 Ml 150 Mi 1 \ ATLANTIC OCEAN Sov.nn.h / FIGURE III-1. Location of SRP Relative to Surrounding Population Centers III-2 --- - FIGURE III-2. The Savannah River Plant III-3 FIGURE 'III-3. Profile of Geologic Formation Beneath the Savannah River Plant . III-5 ,-, -,.. . . . . . 5 .-- -612 CRYSTALLINE ROCK . II rfoce FIGURE III-4. Hydrostatic Head in Ground Water Near H Area III-8 ~'z 'Kw ) -.- ________ Alu EN F PLATEAU ";<--'-----% \ ~//i.s,t,,7 --- I '220--- Heed in Tuscaloosa ft H20 obove me.. $,0 level - 5 0 5 10 ,5 MILES FIGURE III-5. Flow in Tuscaloosa Aquifer (Ongoing hydrographic measurements indicate that this flow pattern has remained the same under the SRP site since the early 1950' s.) 111-10 . FIGURE

91

The Mining Life : : A Transnational History of Race and Family in the U.S.-Mexico Borderlands, 1890-1965  

E-Print Network [OSTI]

no. 437, Mining Engineering Project, Oral History Office,hierarchies. The history of mining engineering families inthe engineering profession because most histories of mining

Maiorana, Juliette Charlie

92

History Images  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History Images History Images Los Alamos History in Images Los Alamos has a proud history and heritage of almost 70 years of science and innovation. The people of the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to many of the nation's most crucial security challenges. Click thumbnails to enlarge. Photos arranged by most recent first, horizontal formats before vertical. See Flickr for more sizes and details. Back in the day Back in the day LA bridge in Los Alamos LA bridge in Los Alamos 1945 Army-Navy "E" Award 1945 Army-Navy "E" Award Louis Rosen Louis Rosen Bob Van Ness Robert Kuckuck and Michael Anastasio Bob Van Ness Robert Kuckuck and Michael Anastasio TA-18 TA-18 Elmer Island TU-4 assembly area Elmer Island TU-4 assembly area

93

ESnet History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net ESnet History View ESnet's 25-year anniversary timeline in...

94

NTS_History.indd  

Broader source: Energy.gov (indexed) [DOE]

Atmospheric Nuclear Atmospheric Nuclear Weapons Testing 1951 - 1963 Battlefi eld of the Cold War The Nevada Test Site United States Department of Energy Volume I Of related interest: Origins of the Nevada Test Site by Terrence R. Fehner and F. G. Gosling The Manhattan Project: Making the Atomic Bomb * by F. G. Gosling The United States Department of Energy: A Summary History, 1977 - 1994 * by Terrence R. Fehner and Jack M. Holl * Copies available from the U.S. Department of Energy 1000 Independence Ave. S.W., Washington, DC 20585 Attention: Offi ce of History and Heritage Resources Telephone: 301-903-5431 DOE/MA-0003 Terrence R. Fehner & F. G. Gosling Offi ce of History and Heritage Resources Executive Secretariat Offi ce of Management Department of Energy September 2006 Battlefi eld of the Cold War

95

Cosmic Growth History and Expansion History  

E-Print Network [OSTI]

of the expansion history dark energy equation of state,and growth history constraints on the dark energy equationand growth history constraints on the dark energy equation

Linder, Eric V.

2009-01-01T23:59:59.000Z

96

Finding Six-Figure ROI From Energy Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency September 28, 2010 - 10:20am Addthis Kevin Craft What are the key facts? Recovery Act funded energy efficiency lighting upgrades in Huntington, New York. Street lighting accounts for 40% of town's electric costs. Huntington estimates $151,000 in annual savings through lighting changes. Return-on-investment -- that is the phrase town officials in Huntington, New York, carefully considered before commissioning several projects to improve municipal energy efficiency. "Saving town residents money on energy bills is one way to help stimulate the local economy. So we looked for projects that would save our residents as much money as possible," said Huntington Supervisor Frank Petrone.

97

Finding Six-Figure ROI From Energy Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency September 28, 2010 - 10:20am Addthis Kevin Craft What are the key facts? Recovery Act funded energy efficiency lighting upgrades in Huntington, New York. Street lighting accounts for 40% of town's electric costs. Huntington estimates $151,000 in annual savings through lighting changes. Return-on-investment -- that is the phrase town officials in Huntington, New York, carefully considered before commissioning several projects to improve municipal energy efficiency. "Saving town residents money on energy bills is one way to help stimulate the local economy. So we looked for projects that would save our residents as much money as possible," said Huntington Supervisor Frank Petrone.

98

NETL: History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History About NETL History Over the past century, fossil energy research and technology development has been advanced by NETL and its predecessor facilities as the energy needs of the Nation have grown and evolved. 1910 - The newly created Bureau of Mines in the U.S. Department of the Interior (DOI) opens the Pittsburgh Experiment Station in Bruceton, Pennsylvania, 12 miles south of Pittsburgh. The station includes an experimental coal mine and offers advanced training for coal operators and miners. Onsite research focuses on developing innovative coal-mining safety equipment and practices. 1918 - Following new discoveries of oil in Oklahoma and Texas, the Petroleum Experiment Station is established in Bartlesville, Oklahoma, as one of 17 DOI Bureau of Mines facilities under Public Law 283 (63rd Congress, 1915). The Station pursues systematic application of engineering and scientific methods to oil drilling, helping the early "boom and bust" oil industry create operating and safety standards.

99

NERSC History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History NERSC History Powering Scientific Discovery Since 1974 Contact: Jon Bashor, jbashor@lbl.gov, +1 510 486 4236 For more information, read "25 Years of Leadership," a historical perspective written at NERSC's quarter-century mark.⨠Download (PDF, 1.7MB) The oil crisis of 1973 did more than create long lines at the gas pumps - it jumpstarted a supercomputing revolution. The quest for alternative energy sources led to increased funding for the Department of Energy's Magnetic Fusion Energy program, and simulating the behavior of plasma in a fusion reactor required a computer center dedicated to this purpose. Founded in 1974 at Lawrence Livermore National Laboratory, the Controlled Thermonuclear Research Computer Center was the first unclassified supercomputer center and was the model for those that

100

Figure legends Figure 1: Normalized radiance spectra of the different experimental color  

E-Print Network [OSTI]

treatment groups. The fluorescent (red) line represents the narrow rearing treatment. The 5500K (green) and 10000K (blue) lines represent the two bulb types used. #12;Figure S4: Behavioral predictive model performance for the broad-spectrum

Carleton, Karen L.

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - Figure_14_15.doc  

Gasoline and Diesel Fuel Update (EIA)

44 0 2 4 6 8 10 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 Dollars per Thousand Cubic Meters Constant Dollars Nominal Dollars Figure 14. Average Price of Natural Gas Delivered to Residential Consumers, 1980-2002 Figure 15. Average City Gate Price of Natural Gas in the United States, 2002 (Dollars per Thousand Cubic Feet) Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2002 dollars using the chain-type price indexes for Gross Domestic Product (1996 = 1.0) as published by the U.S. Department of Commerce, Bureau of Economic Analysis.

102

EIA - AEO2010 - Emissions projections  

Gasoline and Diesel Fuel Update (EIA)

Emissions Projections Emissions Projections Annual Energy Outlook 2010 with Projections to 2035 Emissions Projections Figure 93. Carbon dioxide emissions by sector and fuel, 2008 and 2035 Click to enlarge » Figure source and data excel logo Figure 94. Sulfur dioxide emissions from electricity generation, 2000-2035 Click to enlarge » Figure source and data excel logo Figure 95. Nitrogen oxide emissions from electricity generation, 2000-2035 Click to enlarge » Figure source and data excel logo Growth of carbon dioxide emissions slows in the projections Federal and State energy policies recently enacted will stimulate increased use of renewable technologies and efficiency improvements in the future, slowing the growth of energy-related CO2 emissions through 2035. In the Reference case, emissions do not exceed pre-recession 2007 levels until 2025. In 2035, energy-related CO2 emissions total 6,320 million metric tons, about 6 percent higher than in 2007 and 9 percent higher than in 2008 (Figure 93). On average, emissions in the Reference case grow by 0.3 percent per year from 2008 to 2035, compared with 0.7 percent per year from 1980 to 2008.

103

Short-Term Energy Outlook Figures  

U.S. Energy Information Administration (EIA) Indexed Site

Independent Statistics & Analysis" Independent Statistics & Analysis" ,"U.S. Energy Information Administration" ,"Short-Term Energy Outlook Figures, December 2013" ,"U.S. Prices" ,,"West Texas Intermediate (WTI) Crude Oil Price" ,,"U.S. Gasoline and Crude Oil Prices" ,,"U.S. Diesel Fuel and Crude Oil Prices" ,,"Henry Hub Natural Gas Price" ,,"U.S. Natural Gas Prices" ,"World Liquid Fuels" ,,"World Liquid Fuels Production and Consumption Balance" ,,"Estimated Unplanned Crude Oil Production Outages Among OPEC Producers" ,,"Estimated Unplanned Crude Oil Production Disruptions Among non-OPEC Producers" ,,"World Liquid Fuels Consumption" ,,"World Liquid Fuels Consumption Growth"

104

Revision History  

Broader source: Energy.gov (indexed) [DOE]

Revision History Revision History Rev. 0, August 2012 Original submittal for milestone M3FT-12SN0804032 (Sandia programmatic and classification review) Rev. 1, September 2012 Corrected transposition errors in costing tables; recalculated stainless steel overpacks to be carbon steel; corrected various editorial problems. (SAND2012-7979P) Rev. 2, November 2012 Performed peer review and retitled. Submittal for milestone M2FT-13SN0804031 (formerly milestone M2FT- 12SN0804031) (SAND2012-9737P) Unclassified Unlimited Release Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

105

Microsoft Word - Figure_18_19.doc  

Gasoline and Diesel Fuel Update (EIA)

9 9 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK MD 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK Figure 18. Average Price of Natural Gas Delivered to U.S. Onsystem Industrial Consumers, 2004 (Dollars per Thousand Cubic Feet) Figure 19. Average Price of Natural Gas Delivered to U.S. Electric Power Consumers, 2004 (Dollars per Thousand Cubic Feet) Source: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition." Note: States where the electric power price has been withheld (see Table 23) are included in the $0.00-$2.49 price category.

106

Microsoft Word - Figure_14_15.doc  

Gasoline and Diesel Fuel Update (EIA)

5 5 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DC NC SC GA AL MS LA FL HI AK DE 0 2 4 6 8 10 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 Dollars per Thousand Cubic Meters Constant Dollars Nominal Dollars Figure 14. Average Price of Natural Gas Delivered to Residential Consumers, 1980-2004 Figure 15. Average City Gate Price of Natural Gas in the United States, 2004 (Dollars per Thousand Cubic Feet) Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2004 dollars using the chain-type price indexes for Gross Domestic Product

107

Mound History and Information  

Office of Legacy Management (LM)

Mound Site History and Information Mound Site History and Information The Mound site, formerly known as the Mound Plant or Facility, takes its name from a nearby Na- tive American burial mound. The 306 acre facility is sited on a hill in the center of Miamisburg, Ohio. Construction of the Mound Plant began in 1946, and the site became operational in 1949. Mound, the nation's first post-war U.S. Atomic Energy Commission site to be constructed, was established to consolidate and continue the work conducted at the Dayton Units for the Manhattan Project. Much of the work at the Mound Plant during the Cold War involved production of the polonium- beryllium initiators used in early atomic weapons and the manufacture of and research related to ra- dionuclides. In the 1950s, the facility began to

108

Derek R. Peterson Department of History  

E-Print Network [OSTI]

for Church History, for Ethnic Patriotism and the East African Revival 2009 Elected Fellow of the Royal for Research Libraries/Cooperative Africana Microfilms Project grant to fund the `Project to Preserve and Economic Research, $1,500,000 2012 Center for Research Libraries/Cooperative Africana Microfilms Project

Edwards, Paul N.

109

Project Summary This project is to investigate how hypoxia affects the production of specific types of  

E-Print Network [OSTI]

Project Summary This project is to investigate how hypoxia affects the production of specific and established procedures in the GrandeAllen lab. The figure below outlines the experimental setup

Richards-Kortum, Rebecca

110

Evaluation of the Life History of Native Salmonids in the Malheur River Basin; Cooperative Bull Trout/Redband Trout Research Project, 1999-2000 Annual Report.  

SciTech Connect (OSTI)

The purpose of this study is to document the seasonal distribution of adult/sub-adult bull trout (Salvelinus confluentus) in the Malheur River basin. Due to the decline of bull trout in the Columbia Basin, the United States Fish and Wildlife Service listed bull trout as a threatened species in June 1998. Past land management activities; construction of dams; and fish eradication projects in the North Fork and Middle Fork Malheur River by poisoning have worked in concert to cumulatively impact native species in the Malheur Basin (Bowers et. al. 1993). Survival of the remaining bull trout populations is severely threatened (Buchanan 1997). 1999 Research Objects are: (1) Document the migratory patterns of adult/sub-adult bull trout in the North Fork Malheur River; (2) Determine the seasonal bull trout use of Beulah Reservoir and bull trout entrainment; and (3) Timing and location of bull trout spawning in the North Fork Malheur River basin. The study area includes the Malheur basin from the mouth of the Malheur River located near Ontario, Oregon to the headwaters of the North Fork Malheur River (Map 1). All fish collected and most of the telemetry effort was done on the North Fork Malheur River subbasin (Map 2). Fish collection was conducted on the North Fork Malheur River at the tailwaters of Beulah Reservoir (RK 29), Beulah Reservoir (RK 29-RK 33), and in the North Fork Malheur River at Crane Crossing (RK 69) to the headwaters of the North Fork Malheur. Radio telemetry was done from the mouth of the Malheur River in Ontario, Oregon to the headwaters of the North Fork Malheur. This report will reflect all migration data collected from 3/1/99 to 12/31/99.

Schwabe, Lawrence; Tiley, Mark (Burns Paiute Tribe, Department of Fish and Wildlife, Burns, OR); Perkins, Raymond R. (Oregon Department of Fish and Wildlife, Ontario, OR)

2000-11-01T23:59:59.000Z

111

Complexity in Big History  

E-Print Network [OSTI]

Spier, Fred. How Big History Works: Energy Flows and RiseSmil, Vaclav. Energy in World History. Boulder, CO: Westviewkg) Energy and complexity Spier: Complexity in Big History.

Spier, Fred

2011-01-01T23:59:59.000Z

112

Microsoft Word - Figure_3_4.doc  

Gasoline and Diesel Fuel Update (EIA)

7 7 None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001-and over WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK GOM 0 1 2 3 4 5 6 7 T e x a s G u l f o f M e x i c o N e w M e x i c o O k l a h o m a W y o m i n g L o u i s i a n a C o l o r a d o A l a s k a K a n s a s A l a b a m a A l l O t h e r S t a t e s Trillion Cubic Feet 0 30 60 90 120 150 180 Billion Cubic Meters 2002 2003 2002 Figure 4. Marketed Production of Natural Gas in Selected States and the Gulf of Mexico, 2002-2003 Figure 3. Marketed Production of Natural Gas in the United States and the Gulf of Mexico, 2003 (Million Cubic Feet) GOM = Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-895, "Monthly and Annual Quantity and Value of Natural Gas Report," and the United States Mineral Management

113

This Letter presented projections of future sea-level rise based on simulations of the past 22,000 years of sea-level history using a simple, empirical model linking sea-level rise to global mean-temperature anomalies. One of the main conclusions of the L  

E-Print Network [OSTI]

This Letter presented projections of future sea-level rise based on simulations of the past 22,000 years of sea-level history using a simple, empirical model linking sea-level rise to global mean of sea-level rise during the twenty-first century that are reported in the Fourth Assessment Report

Siddall, Mark

114

The history of the LHC  

ScienceCinema (OSTI)

Abstract: From the civil engineering, to the manufacturing of the various magnet types, each building block of this extraordinary machine required ambitious leaps in innovation. This lecture will review the history of the LHC project, focusing on the many challenges -- scientific, technological, managerial -- that had to be met during the various phases of R&D;, industrialization, construction, installation and commissioning.

None

2011-10-06T23:59:59.000Z

115

ProClim-Flash | No 57, June 201318 Figure 1: Swiss CH4 fluxes from (a) anthropogenic (agriculture, energy, waste) and (b) natural contributors (wetlands, lakes and  

E-Print Network [OSTI]

April 2013 under the United Nations Framework Convention on Climate Change and under the Kyoto Protocol layers representing CH4 emissions from wastewater treatment and natural sources and sinks (Figure 1b by the CCES projects ENHANCE, www.cces.ethz.ch/ projects/sulu/ENHANCE, and BioChange, www.cces.ethz.ch/projects/clench/BioChange

116

Our History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

History History Our History Elk Hills Naval Petroleum Reserve Circa 1920s Elk Hills Naval Petroleum Reserve Circa 1920s The Office of Fossil Energy has the longest directly-traceable history of any organization in the Department of Energy. While the nuclear energy program can look back to the Manhattan Project of World War II for its origins, the Federal Government's involvement in fossil fuel resources began several decades earlier, in the early 1900s. Oil Dominates Early Concerns The U.S.S. Colorado, Maryland, and West Virginia off the coast of California during the 1920's. The West Virginia was one of the first oil-burning ships. Much as today, petroleum was a major concern for the Federal Government at the start of the 20th century. Barely 50 years after the birth of the

117

Quantification of uncertainty during history matching  

E-Print Network [OSTI]

technology requirements and possibly marginal investment indicators. Our method of quantifying uncertainty uses a set of history-match runs and includes a method to determine the probability density function (pdf) of future oil production (reserves... side)?????. 29 3.16 Marginal cumulative oil production correlates well with total error?.. 32 ix FIGURE Page 3.17 Weighted standard deviation is smaller than non weighted?..?..?? 37 3.18 Shows sets of weighted and non weighted mean...

Alvarado, Martin Guillermo

2004-09-30T23:59:59.000Z

118

History of the Stanford Synchrotron Radiation Lightsource | Stanford...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History of the Stanford Synchrotron Radiation Lightsource SPEAR Based on new applications of synchrotron radiation, SSRL began in 1973 as the Stanford Synchrotron Radiation Project...

119

A History or Geothermal Energy Research and Development in the...  

Energy Savers [EERE]

Drilling 1976-2006 A History or Geothermal Energy Research and Development in the United States: Drilling 1976-2006 This report summarizes significant research projects performed...

120

Microsoft Word - Figure_3_4.doc  

Gasoline and Diesel Fuel Update (EIA)

7 7 0 1 2 3 4 5 6 7 T e x a s G u l f o f M e x i c o O k l a h o m a N e w M e x i c o W y o m i n g L o u i s i a n a C o l o r a d o A l a s k a K a n s a s C a l i f o r n i a A l l O t h e r S t a t e s Trillion Cubic Feet 0 30 60 90 120 150 180 Billion Cubic Meters 2003 2004 2003 Figure 4. Marketed Production of Natural Gas in Selected States and the Gulf of Mexico, 2003-2004 GOM = Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA -895, "Monthly Quantity and Value of Natural Gas Report," and the United States Mineral Management Service. Sources: Energy Information Administration (EIA), Form EIA -895, "Monthly Quantity and Value of Natural Gas Report," and the United States Mineral Management Service. None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001-and over

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

122

Rio Grande Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R5-F1 1940 - 1949 3.000 - 8.000 (declining block) 1.250 N.A. R5-F2 549 - 474 4.000 - 4.5000...

123

Seedskadee Participating Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R4-F1 thru 474 3.000 1.275 6.000 UC-F1 474-677 3.000 1.320 6.110 UC-F2 (Firm Only) 6...

124

Figure 3-11 South Table Mountain Utilities Map  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FTLB AMMO LEGEND Gas Existing Buildings Electrical Figure 3-11 South Table Mountain Utilities Map Sewer Communication Water Surface Drainage Storm Water WATER TANK FACILITIES...

125

Labs and Field Site Histories | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Historical Resources » Labs Historical Resources » Labs and Field Site Histories Labs and Field Site Histories Labs and Field Site Histories Note: Every effort is made to keep these links current and updated. Yet as many of the links below point to sites not under our direct control, some may stop working without warning . National Laboratories & Technology Centers Operations Offices & Field Sites Ames Laboratory (Iowa) -- History Chicago Office (Illinois) -- History Argonne National Laboratory (Illinois) -- Laboratory History and Timeline Fernald Environmental Management Project (Ohio) -- Site History Brookhaven National Laboratory (New York) -- Tour Brookhaven's History Grand Junction (Colorado) -- Site Description and History (pdf - less than 1MB) Fermi National Accelerator Laboratory (Illinois) -- History Idaho Operations Office (Idaho) -- Site History

126

Aviation Safety Program Aircraft Aging & Durability Project  

E-Print Network [OSTI]

to Other Projects and Programs 8 2. Milestones & Metrics 10 2.1 10-Year Roadmap 10 2.2 Five Year Milestone for Characterization and Validation (1.5) 32 3.2 Level 2 ­ Discipline Level Capabilities 34 3.2.1 NDE / SHM Systems (2 Roadmap. 11 Figure 5. Representative development of capabilities for Detect Theme. 12 Figure 6

127

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

128

MHK Projects/Akwanga Nigeria SHP | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon MHK ProjectsAkwanga Nigeria SHP < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map......

129

Project Brief: These works, part of the project to complete the RSM and Bessemer Buildings, involve refurbishment of level 3  

E-Print Network [OSTI]

Project Brief: These works, part of the project to complete the RSM and Bessemer Buildings, involve.ac.uk/researchservices/ contractsandcec/fp7/cooperation/nano Construction Project Team: Project Facts & Figures: Budget: £2,024,000 Funding Source: SRIF III Construction Project Programme: Start on Site: December 2007 End Date: Nov 2008

130

ESnet IPv6 History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History Engineering Services The Network OSCARS Fasterdata IPv6 Network IPv6 Implementation Checklist ESnet IPv6 Mirror Servers ESnet IPv6 History ESnet supports Sandia and APNIC...

131

Idaho National Laboratory History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

132

Southeast Idaho History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

133

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The  

E-Print Network [OSTI]

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The percentage of each array dataset that were predicted endo-siRNA targets according to the Ambros dataset (Lee et al. 2006) was plotted [(number of endo-siRNA targets in microarray dataset / total genes

Bass, Brenda L.

134

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

135

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

136

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

137

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

138

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

139

Annual Energy Outlook 2006 with Projections to 2030  

Gasoline and Diesel Fuel Update (EIA)

1. 1. Energy use per capita and per dollar of gross domestic product, 1980-2030 (index, 1980 = 1) Population growth is a key determinant of total energy consumption, closely linked to rising demand for housing, services, and travel. Energy consumption per capita, controlling for population growth, shows the combined effect of other factors, such as economic growth and technology improvement. In the AEO- 2006 reference case, energy consumption per capita grows faster than it has in recent history (Figure 31), as a result of continued growth in disposable income. In dollar terms, the economy as a whole is becoming less dependent on energy, the Nation's growing reli- ance on imported fuel notwithstanding. Projected energy intensity, as measured by energy use per 2000 dollar of GDP, declines at an average annual rate of 1.8 percent in the reference case. Efficiency gains and faster growth

140

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Stuttering as Reflected in Adults Self-Figure Drawings  

Science Journals Connector (OSTI)

This pilot study aimed to detect indicators within self-figure drawings that reflect stuttering in adults. A sample of 20 adults who stutter from childhood were given a blank sheet...n...= 20). Indicators include...

Rachel Lev-Wiesel; Ayala Shabat; Ayala Tsur

2005-03-01T23:59:59.000Z

142

Figure ES2. Annual Indices of Real Disposable Income, Vehicle...  

U.S. Energy Information Administration (EIA) Indexed Site

ES2 Figure ES2. Annual Indices of Real Disposable Income, Vehicle-Miles Traveled, Consumer Price Index (CPI-U), and Real Average Retail Gasoline Price, 1978-2004, 1985100...

143

Ion beam figuring of small optical components Thomas W. Drueding  

E-Print Network [OSTI]

Ion beam figuring of small optical components Thomas W. Drueding Boston University College of Engineering Aerospace and Mechanical Engineering Department Boston, Massachusetts 02215 Steven C. Fawcett Albuquerque, New Mexico 87107 Thomas G. Bifano Boston University College of Engineering Aerospace

144

Correctness of depiction in planar diagrams of spatial figures  

E-Print Network [OSTI]

We show that it is possible to decide whether a given planar diagram correctly depicts the spatial figure consisting of a planar quadrangle together with its shadow in another plane.

P. L. Robinson

2014-03-12T23:59:59.000Z

145

Supplementary Figure 1 SHAPE-MaP data analysis pipeline.  

E-Print Network [OSTI]

Supplementary Figure 1 SHAPE-MaP data analysis pipeline. Outline of software pipeline that fully.1 GHz Intel Core i7 and 16 GB RAM). This strategy is implemented in the SHAPE-MaP Folding Pipeline

Cai, Long

146

United States Agricultural Information Network (USAIN) National Preservation Program for the History of Agriculture and Rural Life: Texas Preservation Project 1820-1945, Texas A&M University: Final Report  

E-Print Network [OSTI]

? The University of Texas General Libraries Dr. Harold Billings, Director Dr. JoAnne Hawkins, Associate Director for Public Services Nancy Paine, Interlibrary Service Librarian o The Center for American History Kate Adams, Associate Director o... ? The University of Texas General Libraries Dr. Harold Billings, Director Dr. JoAnne Hawkins, Associate Director for Public Services Nancy Paine, Interlibrary Service Librarian o The Center for American History Kate Adams, Associate Director o...

Gyeszly, Suzanne D.; McGeachin, Robert B.

147

Figure 7.1. Control of an alarm system. Figure 7.2. A simple memory element.  

E-Print Network [OSTI]

-digit BCD counter. Enable Q0 Q1 Q2 D0 D1 D2 Load Clock 1 0 0 0 Clock Q30 D3 Enable Q0 Q1 Q2 D0 D1 D2 Load Clock 0 0 0 Q30 D3 BCD0 BCD1 Clear Figure 7.30. Johnson counter. D Q Q Clock D Q Q D Q Q Q0 Q1 Qn 1 by CAD tools. Data Clock Latch #12;Figure 7.34. Timing simulation of storage elements. Figure 7.35. Code

Kalla, Priyank

148

A simple figure of merit for high temperature superconducting switches  

SciTech Connect (OSTI)

The discovery of the new high temperature superconductors has revived interest in many special applications, including superconducting switches. For comparison of switch types, a simple figure of merit based in switch performance is proposed, derived for superconducting switches, and then calculated for thyristors and vacuum switches. The figure of merit is then used to show what critical current density would be needed for superconducting switches to compete with more conventional switches. 46 refs., 1 fig.

Honig, E.M.

1989-01-01T23:59:59.000Z

149

Muon Figures: 2001/04/19 Chris Waltham  

E-Print Network [OSTI]

Muon Figures: 2001/04/19 Chris Waltham Hanging Wall 65 Looking o o ~25 S of W Fault Line r=2730 r) and replaced with back#12;ll. The grid is 1000' (#25;300m) square. p Muon Track Light from Muon Xf PSUP Impact Parameter at time Tf Muon leaves PSUP V h Cherenkov Cone Figure 3: Fitting Diagram 2 #12; ) (degrees) fit v

Learned, John

150

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

151

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

152

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

153

Manhattan Project: People Images  

Office of Scientific and Technical Information (OSTI)

PEOPLE IMAGES PEOPLE IMAGES Resources > Photo Gallery Scroll down to see each of these images individually. The images are: 1. J. Robert Oppenheimer, Enrico Fermi, and Ernest Lawrence (courtesy the Lawrence Berkeley National Laboratory); 2. Hanford, Washington, workers sending money home (reproduced from the photo insert in F. G. Gosling, The Manhattan Project: Making the Atomic Bomb (Washington: History Division, Department of Energy, October 2001)); 3. Oppenheimer and Leslie Groves at the Trinity Site, September 1945 (reproduced from the cover of the Office of History and Heritage Resources publication: The Signature Facilities of the Manhattan Project (Washington: History Division, Department of Energy, 2001)); 4. A WAC detachment marching at Oak Ridge, Tennessee, June 1945 (courtesy the Army Corps of Engineers; it is reprinted in Rachel Fermi and Esther Samra, Picturing the Bomb: Photographs from the Secret World of the Manhattan Project (New York: Harry N. Abrams, Inc., Publishers, 1995), 40);

154

Manhattan Project: Suggested Readings  

Office of Scientific and Technical Information (OSTI)

SUGGESTED READINGS SUGGESTED READINGS Resources > Readings The literature on the Manhattan Project is extensive. The purpose of this web page is not to catalogue it, but only to suggest a very select few places to start. For more exhaustive lists of secondary works relating to the early history of nuclear energy, consult the bibliographies of the books listed below. Suggested Surveys of the Manhattan Project Gosling, F. G. The Manhattan Project: Making the Atomic Bomb. DOE/MA-0001; Washington: History Division, Department of Energy, January 1999. An overview history by the Chief Historian of the Department of Energy and the basis for most of the "Events" in this web site. The best short survey for the general reader. Revised with additional photographs in January 2010 as DOE/MA-0002 Revised and available in .pdf format.

155

Archives and History Office: Digital Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources > Digital Resources Resources > Digital Resources Digital Resources Informal History, Part 1 The Histories page provides publications that examine SLAC history or particular events, experiments, and equipment. Publications are listed in reverse chronological order (i.e. newest listed first). Edward L. Ginzton and the MARK III accelerator at Stanford University as it nears its completion in 1952. Copies of Stanford University Physics Department Project M Reports held by the SLAC Archives and History Office, including those produced by the Microwave Lab, and the High-Energy Physics Lab (HEPL) have been scanned and are now available online. Linac construction site showing curved and straight sections in rain and mud, 1963. Copies of ABA reports held by the SLAC Archives have been scanned and are now available online along with a list of ABA numbered reports relating to the development of the SLAC proposal and known to the SLAC Archives and History Office.

156

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

SEEMAN, S.E.

2000-04-01T23:59:59.000Z

157

Cape Wind Project  

Broader source: Energy.gov (indexed) [DOE]

G G Biological Assessment U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix G Biological Assessment Cape Wind Energy Project Nantucket Sound Biological Assessment Minerals Management Service for Consultation with the United States Fish and Wildlife Service and NOAA Fisheries May 2008 Appendix G Biological Assessment Cape Wind Energy Project i May 2008 U.S. Department of the Interior Minerals Management Service MMS TABLE OF CONTENTS 1.0 BACKGROUND ............................................................................................................ 1-1 1.1 Project History .............................................................................................................

158

Appendix A. Reference case projections  

Gasoline and Diesel Fuel Update (EIA)

6 Appendix C Table C5. World crude and lease condensate a production by region and country, Low Oil Price case, 2009-40 (million barrels per day) Region History Projections Average...

159

Appendix A. Reference case projections  

Gasoline and Diesel Fuel Update (EIA)

44 Appendix B Table B5. World crude and lease condensate a production by region and country, High Oil Price case, 2009-40 (million barrels per day) Region History Projections...

160

Uganda: A Modern History  

E-Print Network [OSTI]

pages, hardcover,. $27.50. uganda; A Modern History. Jan J .contemporary history Qf Uganda. His work supplies us with aand integration of Uganda's economy into the World capita 1

Ssali, Ndugu Mike

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Web-enabled project management and collaboration using Microsoft Groove system  

E-Print Network [OSTI]

Technology NSPE National Society of Professional Engineers PMCS Project Management and Collaboration Systems RFI Request for Information RFP Request for Proposal RFQ Request for Quotes ROI Return on Investment vi TABLE OF CONTENTS...)...... 77 Figure 27. Groove RFI module view (Customized from issue tracking tool)....................... 80 Figure 28. Groove RFI tracking sample document view ...................................................... 81 Figure 29. Groove RFP module view...

Yuksel, Kamer

2008-10-10T23:59:59.000Z

162

Kronos 6.2 Project Charter OEPM101 Kronos Project Charter Page 1 of 11  

E-Print Network [OSTI]

Kronos 6.2 Project Charter OEPM101 Kronos Project Charter Page 1 of 11 Project Name: Campus Wide Implementation of a Standardized Timekeeping System ­ Kronos 6.2 Prepared by: Steven McCabe - Project Manager Date (MM/DD/YYYY): June 30, 2011 Project Charter Version History: Version Date (MM/DD/YYYY) Comments

Doudna, Jennifer A.

163

BLACK HISTORY MONTH  

Broader source: Energy.gov [DOE]

Black History Month is an annual celebration of achievements by black Americans and a time for recognizing the central role of African Americans in U.S. history. The event grew out of Negro History Week, created by historian Carter G. Woodson and other prominent African Americans. Other countries around the world, including Canada and the United Kingdom, also devote a month to celebrating black history.

164

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

165

A handbook of history  

Science Journals Connector (OSTI)

...February-March 1997 review-article Reviews A handbook of history P D Hingley Librarian of the RAS Burlington House...it all. REVIEWS February/March 1997 Vol 38 Issue1 32 A handbook of history Cambridge Illustrated History of Astronomy by......

P D Hingley

1997-01-01T23:59:59.000Z

166

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

167

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

168

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

169

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

170

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

171

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

172

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

173

IUPAC Solubility Data Project 1973?2001  

Science Journals Connector (OSTI)

This is a history of the International Union of Pure and Applied Chemistry Solubility Data Commission and the Solubility Data Project that it organized and supervised. ... This worked fine when the projects were not too large, but the Solubility Data Project planned large time-consuming projects. ... H. L. Clever, Krypton, Xenon and Radon (1979), xx + 357 pp. ...

H. Lawrence Clever

2004-10-20T23:59:59.000Z

174

Figure 7.8 shows the cross-sections so recovered for the connection of the SHGC of Figure 6.8.b and the termination of the SHGC of Figure 6.8.d.  

E-Print Network [OSTI]

30 Figure 7.8 shows the cross-sections so recovered for the connection of the SHGC of Figure 6.8.b and the termination of the SHGC of Figure 6.8.d. For discontinuous connections where there are no limb patches description (see top right SHGC in Figure 7.12.b and c for which discontinuity is caused by self occlusion

Southern California, University of

175

Manhattan Project: Library  

Office of Scientific and Technical Information (OSTI)

LIBRARY LIBRARY Resources A number of government publications relating to the Manhattan Project are available either as web pages or as .pdf documents. Cover of the Manhattan Project publication Department of Energy Publications Fehner and Gosling, Origins of the Nevada Test Site Fehner and Gosling, Battlefield of the Cold War: The Nevada Test Site Gosling, Manhattan Project, 1999 Gosling, Manhattan Project, 2010 Harnessed Atom United States Nuclear Tests, 1945-1992 Wahlen, History of 100-B Area Los Alamos National Laboratory Publications Bainbridge, Trinity Fakley, "The British Mission" Hawkins, MDH: Project Y, Vol. 1 Los Alamos: Beginning of an Era, 1943-1945 Malik, Yields of Hiroshima and Nagasaki "Oppenheimer Years" Serber, Los Alamos Primer Truslow, MDH: Project Y, Vol. 2

176

INVESTIGATION Inferring Admixture Histories of Human Populations  

E-Print Network [OSTI]

and apply to test for admixture among all populations from the Human Genome Diversity Project (HGDPINVESTIGATION Inferring Admixture Histories of Human Populations Using Linkage Disequilibrium Po-range migrations and the resulting admixtures between populations have been important forces shaping human genetic

Reich, David

177

Forces on a magnet moving past figure-eight coils  

SciTech Connect (OSTI)

For the first time, the lift, drag, and guidance forces acting on a permanent magnet are measured as the magnet passes over different arrays of figure-eight (null-flux) coils. The experimental results are in good agreement with the predictions of dynamic circuit theory, which is used to explain more optimal coil arrays.

Mulcahy, T.H.; He, Jianliang; Rote, D.M. [Argonne National Lab., IL (United States); Rossing, T.D. [Northern Illinois Univ., De Kalb, IL (United States). Dept. of Physics

1993-03-01T23:59:59.000Z

178

Forces on a magnet moving past figure-eight coils  

SciTech Connect (OSTI)

For the first time, the lift, drag, and guidance forces acting on a permanent magnet are measured as the magnet passes over different arrays of figure-eight (null-flux) coils. The experimental results are in good agreement with the predictions of dynamic circuit theory, which is used to explain more optimal coil arrays.

Mulcahy, T.H.; He, Jianliang; Rote, D.M. (Argonne National Lab., IL (United States)); Rossing, T.D. (Northern Illinois Univ., De Kalb, IL (United States). Dept. of Physics)

1993-01-01T23:59:59.000Z

179

Microsoft Word - figure_07-2014-update.doc  

U.S. Energy Information Administration (EIA) Indexed Site

1 Source: Office of Fossil Energy, U.S. Department of Energy, Natural Gas Imports and Exports. Figure 7. U.S. natural gas trade summary, 2009-2013 0 0.5 1 1.5 2 2.5 3 3.5 4 2009...

180

Figures of the World Healthcare Organisation show that stroke  

E-Print Network [OSTI]

Figures of the World Healthcare Organisation show that stroke is currently the leading cause disabilities following a stroke, the economic burden and shortage of rehabilitation therapists are also developed a robotic exoskeleton system that meets the requirements of effective post-stroke upper

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

THE FIRST LAW OF THERMODYNAMICS35116 FIGURE 3-46  

E-Print Network [OSTI]

lIb THE FIRST LAW OF THERMODYNAMICS3·5116 FIGURE 3-46 Energy cannot be created or destroyed; it can. The first law of thermodynamics, also known as the conservation of energy principle, provides a sound basis observa- tions, the first law of thermodynamics states that energy can be neither created nor destroyed

Kammen, Daniel M.

182

History of the DOE Human Genome Program  

Office of Scientific and Technical Information (OSTI)

History of the DOE Human Genome Program History of the DOE Human Genome Program The following history is taken from the U.S. Department of Energy 1991-91 Human Genome Program Report (June 1992). This is an archived item. A brief history of the U.S. Department of Energy (DOE) Human Genome Program will be useful in a discussion of the objectives of the DOE program as well as those of the collaborative U.S. Human Genome Project. The Office of Health and Environmental Research (OHER) of DOE and its predecessor agencies--the Atomic Energy Commission and the Energy Research and Development Administration--have long sponsored research into genetics, both in microbial systems and in mammals, including basic studies on genome structure, replication, damage, and repair and the consequences of genetic

183

DOE History Timeline | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Timeline Timeline DOE History Timeline DOE History Timeline The Department of Energy is one of the most interesting and diverse agencies in the Federal Government. Activated on October 1, 1977, the twelfth cabinet-level department brought together for the first time within one agency two programmatic traditions that had long coexisted within the Federal establishment: 1) defense responsibilities that included the design, construction, and testing of nuclear weapons dating from the Manhattan Project effort to build the atomic bomb during World War II; and 2) a loosely knit amalgamation of energy-related programs scattered throughout the Federal Government. The intent of the DOE History Timeline is to provide the public with easy access to accurate information about the history of DOE and its predecessor

184

NAWS-China Lake Project  

Broader source: Energy.gov (indexed) [DOE]

g g y g y S S C C NAWS NAWS - - China Lake China Lake Working with the Local Utility Working with the Local Utility Mark Shvartzman Mark Shvartzman Project Manager, Southern California Edison Project Manager, Southern California Edison Presented at the November FUPWG Meeting Presented at the November FUPWG Meeting November 18, 2009 November 18, 2009 1 1 g E t bli h d i 1998 d Ad i Fili 1358 E History of SCE's UESC Program History of SCE's UESC Program History of SCE s UESC Program History of SCE s UESC Program * Background - Edison developed Energy Related Services (ERS) to assist Federal customers in identifying and implementing energy efficiency and renewable energy projects at government owned and/or managed facilities within Southern California Edison service territory - Established in 1998 under Advice Filing 1358-E

185

NETL: Albany, Oregon History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home > About NETL > History > Albany Research Center History Home > About NETL > History > Albany Research Center History About NETL Albany, Oregon History Albany Research Center has a history rich in successful materials research and development. It was on March 17, 1943 that President Franklin D. Roosevelt announced that the U. S. Bureau of Mines had selected a site in Albany, Oregon for the new Northwest Electro-development Laboratory. The original mission of the center was to find methods for using the abundant low-grade resources of the area, and to develop new metallurgical processes using the abundant electrical energy in the area. The name of the center was changed in 1945 to the Albany Metallurgy Research Center and was used through 1977 where the name was shortened to Albany Research Center. One of our first successes was the development

186

Kristie Stremel Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas Kristie Stremel Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Return to Kristie Stremel Oral History in KU ScholarWorks Tami Albin, Director for Under the Rainbow...

Stremel, Kristie; Albin, Tami

2009-10-27T23:59:59.000Z

187

UBC adopts energy makeover project  

E-Print Network [OSTI]

May 2011 3 UBC adopts energy makeover project 15 Max Jones makes PhD history in the Okanagan 16. This adaptation may better their odds of surviving projected rises in water temperature because of climate change. "Things like tuition, student loans, the economy, whether they'll get a job when they graduate, high cost

Farrell, Anthony P.

188

caribou.case2.doc 1 GIS Professional Ethics Project gisprofessionalethics.org  

E-Print Network [OSTI]

boundaries (including land ownership), vegetation, regulatory data, and subsurface seismic data. The project.S. Fish and Wildlife Service (Figure 1). Although the proposed path of the pipeline itself will not fall

Wright, Dawn Jeannine

189

Coastal engineering, history of  

Science Journals Connector (OSTI)

Turner I.L., Leatherman S.P., 1997. Beach dewatering as a soft' engineering solution to coastal erosion A history and critical review. J Coastal Res 13...

Per Bruun

1982-01-01T23:59:59.000Z

190

Comparing Efficiency Projections (released in AEO2010)  

Reports and Publications (EIA)

Realized improvements in energy efficiency generally rely on a combination of technology and economics. The figure below illustrates the role of technology assumptions in the Annual Energy Outlook 2010 projections for energy efficiency in the residential and commercial buildings sector. Projected energy consumption in the Reference case is compared with projections in the Best Available Technology, High Technology, and 2009 Technology cases and an estimate based on an assumption of no change in efficiency for building shells and equipment.

2010-01-01T23:59:59.000Z

191

M. Bahrami ENSC 283 (S 11) Wind Turbine Project 1 ENSC 283 Project  

E-Print Network [OSTI]

and the vertical-axis wind turbine (VAWT) in Figure 2-b. The designation simply depends on the axis of rotationM. Bahrami ENSC 283 (S 11) Wind Turbine Project 1 ENSC 283 Project Assigned date: Feb. 23, 2011 family), but also important are those which extract energy form the fluid such as turbines. Wind turbines

Bahrami, Majid

192

PROJECT NAME/ID",,,"Jobs figures to report",,"October 2010 Report...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

,1601,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1602,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1603,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1604,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1605,,,,,,0,,0,,0,,0,,0,,0...

193

History of Astronomy  

Science Journals Connector (OSTI)

... pages Prof. G. Abetti gives the reader a straightforward summary of the history of astronomy. As he remarks in the preface, a book of this size "can be ... the history and civilization of the peoples of the Earth". First we have ancient astronomy, which can be traced back to about forty centuries before Christ and which can ...

W. M. H. GREAVES

1955-08-20T23:59:59.000Z

194

David Ollington Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas David Ollington Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Return to David Ollington...

Ollington, David; Albin, Tami

2010-01-11T23:59:59.000Z

195

George Paris Oral History  

E-Print Network [OSTI]

Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Part 6 video platform video... Under the Rainbow: Oral Histories of GLBTQ People in Kansas George Paris Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player...

Paris, George; Albin, Tami

2010-01-11T23:59:59.000Z

196

Steven Brown Oral History  

E-Print Network [OSTI]

Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Part 6 video platform video management video solutionsvideo player Part 7 video platform video... Under the Rainbow: Oral Histories of GLBTQ People in Kansas Steven Brown Oral History Part 2 video platform video management video solutionsvideo player Part 3 video platform video management video solutionsvideo player...

Brown, Steven; Albin, Tami

2010-11-24T23:59:59.000Z

197

Microscale acceleration history discriminators  

DOE Patents [OSTI]

A new class of micromechanical acceleration history discriminators is claimed. These discriminators allow the precise differentiation of a wide range of acceleration-time histories, thereby allowing adaptive events to be triggered in response to the severity (or lack thereof) of an external environment. Such devices have applications in airbag activation, and other safety and surety applications.

Polosky, Marc A. (Albuquerque, NM); Plummer, David W. (Albuquerque, NM)

2002-01-01T23:59:59.000Z

198

A handbook of history  

Science Journals Connector (OSTI)

......review-article Reviews A handbook of history P D Hingley...professional astronomy. This does not mean that it skimps...1997 Vol 38 Issue1 32 A handbook of history Cambridge Illustrated...this magnificent new work does not totally replace the......

P D Hingley

1997-01-01T23:59:59.000Z

199

Clean Coal Technology Programs: Completed Projects (Volume 2)  

SciTech Connect (OSTI)

Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

Assistant Secretary for Fossil Energy

2003-12-01T23:59:59.000Z

200

[FIGURE] FIG 0.0 ELEPHANTS AND ETHICS  

E-Print Network [OSTI]

[FIGURE] FIG 0.0 ELEPHANTS AND ETHICS 1.Wemmer,Elephants and Ethics 2/1/08 2:22 PM Page i #12;1.Wemmer,Elephants and Ethics 2/1/08 2:22 PM Page ii #12;Edited by CHRISTEN WEMMER AND CATHERINE A. CHRISTEN ELEPHANTS AND ETHICS TOWARD A MORALITY OF COEXISTENCE Foreword by John Seidensticker THE JOHNS

Hardin, Rebecca D.

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Mosquito Life Histories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Life Histories Life Histories Nature Bulletin No. 682 June 2, 1962 Forest Preserve District of Cook County John J. Duffy, President David H. Thompson, Senior Naturalist MOSQUITO LIFE HISTORIES Everybody knows that a mosquito is a small, long-legged insect that bites. However, there are many kinds of them each with its own peculiarities of life history and habits. Some are produced in marshes or in flood plains of streams, some in puddles, some in woodlands, and others in cities and towns. Here in the Chicago region, although mosquito-borne diseases are no longer a danger, they become nuisances in many places at certain times in almost every year. In times past and in many countries the mosquitoes which carried malaria, yellow fever and other infections shaped the course of history. Hundreds of scientists have studied them for years but much remains to be learned.

202

Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary, Annual Report 2010  

SciTech Connect (OSTI)

This report describes the 2010 research conducted under the U.S. Army Corps of Engineers (USACE) project EST-P-09-1, titled Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary, and known as the 'Salmon Benefits' study. The primary goal of the study is to establish scientific methods to quantify habitat restoration benefits to listed salmon and trout in the lower Columbia River and estuary (LCRE) in three required areas: habitat connectivity, early life history diversity, and survival (Figure ES.1). The general study approach was to first evaluate the state of the science regarding the ability to quantify benefits to listed salmon and trout from habitat restoration actions in the LCRE in the 2009 project year, and then, if feasible, in subsequent project years to develop quantitative indices of habitat connectivity, early life history diversity, and survival. Based on the 2009 literature review, the following definitions are used in this study. Habitat connectivity is defined as a landscape descriptor concerning the ability of organisms to move among habitat patches, including the spatial arrangement of habitats (structural connectivity) and how the perception and behavior of salmon affect the potential for movement among habitats (functional connectivity). Life history is defined as the combination of traits exhibited by an organism throughout its life cycle, and for the purposes of this investigation, a life history strategy refers to the body size and temporal patterns of estuarine usage exhibited by migrating juvenile salmon. Survival is defined as the probability of fish remaining alive over a defined amount of space and/or time. The objectives of the 4-year study are as follows: (1) develop and test a quantitative index of juvenile salmon habitat connectivity in the LCRE incorporating structural, functional, and hydrologic components; (2) develop and test a quantitative index of the early life history diversity of juvenile salmon in the LCRE; (3) assess and, if feasible, develop and test a quantitative index of the survival benefits of tidal wetland habitat restoration (hydrologic reconnection) in the LCRE; and (4) synthesize the results of investigations into the indices for habitat connectivity, early life history diversity, and survival benefits.

Diefenderfer, Heida L.; Johnson, Gary E.; Sather, Nichole K.; Skalski, J. R.; Dawley, Earl M.; Coleman, Andre M.; Ostrand, Kenneth G.; Hanson, Kyle C.; Woodruff, Dana L.; Donley, Erin E.; Ke, Yinghai; Buenau, Kate E.; Bryson, Amanda J.; Townsend, Richard L.

2011-10-01T23:59:59.000Z

203

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

204

Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices  

SciTech Connect (OSTI)

This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center] [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

1991-05-31T23:59:59.000Z

205

President Roosevelt Establishes Manhattan Project | National Nuclear  

National Nuclear Security Administration (NNSA)

Establishes Manhattan Project | National Nuclear Establishes Manhattan Project | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > President Roosevelt Establishes Manhattan Project President Roosevelt Establishes Manhattan Project June 17, 1942 Washington, DC President Roosevelt Establishes Manhattan Project

206

Commemorating Black History: Contributions of African Americans to the  

Broader source: Energy.gov (indexed) [DOE]

Commemorating Black History: Contributions of African Americans to Commemorating Black History: Contributions of African Americans to the Manhattan Project Commemorating Black History: Contributions of African Americans to the Manhattan Project February 21, 2013 - 12:00pm Addthis July 20, 1944 July 20, 1944 September 21, 1944 September 21, 1944 March 24, 1944 March 24, 1944 June 27, 1944 June 27, 1944 July 20, 1944 September 21, 1944 March 24, 1944 June 27, 1944 The Department of Energy (DOE) commissioned an exhibit documenting the contributions of African Americans to the Manhattan Project at Hanford Reservation. The exhibit features pictures taken from the Hanford archives and oral histories of African Americans. The site was used to produce plutonium for the bomb that brought an end to World War II. During that era, people from all over the country came to Hanford, ultimately forming a

207

BNL | Our History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Our History Our History A Passion for Discovery, a History of Scientific Achievement Brookhaven National Laboratory was established in 1947 on the eastern end of Long Island at the former site of the U.S. Army's Camp Upton. Originally built out of a post-World War II desire to explore the peaceful applications of atomic energy, the Laboratory now has a broader mission: to perform basic and applied research at the frontiers of science, including nuclear and high-energy physics; physics and chemistry of materials; nanoscience; energy and environmental research; national security and nonproliferation; neurosciences; structural biology; and computational sciences. Over its history, Brookhaven Lab has housed three research reactors, numerous one-of-a-kind particle accelerators, and other

208

Kelli Cox Oral History  

E-Print Network [OSTI]

Oral history interview with Kelli Cox conducted by Lauren Helmer in Lawrence, Kansas, on December 30, 2010. In this inteview, Kelli Cox discusses her experiences attending a variety of churches in Lawrence, including the Christ Community Church...

Cox, Kelli; Helmer, Lauren

2010-12-30T23:59:59.000Z

209

Noah Hamilton Oral History  

E-Print Network [OSTI]

Oral history interview with Noah Hamilton conducted by Stephanie Meador in Topeka, Kansas, on November 20, 2009. In this interview, Noah Hamilton describes the experience of being raised in the Bah' faith. He discusses the tenets of Bah...

Hamilton, Noah; Meador, Stephanie Rae

2009-11-20T23:59:59.000Z

210

Black History Month  

Broader source: Energy.gov [DOE]

During National African American History Month, we pay tribute to the contributions of past generations and reaffirm our commitment to keeping the American dream alive for the next generation. In...

211

Beverly Boyd Oral History  

E-Print Network [OSTI]

Oral history interview with Beverly Boyd conducted by Steve Teichgraeber in Lawrence, Kansas, on November 12, 2010. In this interview, Beverly Boyd discusses the life of Saint Rose-Phillippine Duchesne (1769-1852), a ...

Boyd, Beverly; Teichgraeber, Steve

2010-11-12T23:59:59.000Z

212

Garrett Fugate Oral History  

E-Print Network [OSTI]

Oral history interview with Garrett Fugate conducted by Jeremy Adkison in 2010. In this interview, University of Kansas student Garrett Fugate discusses his childhood experiences as a member of the Greek Orthodox community, and his eventual decision...

Fugate, Garrett; Adkison, Jeremy

2010-01-01T23:59:59.000Z

213

PUREX/UO{sub 3} facilities deactivation lessons learned: History  

SciTech Connect (OSTI)

In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status.

Gerber, M.S.

1997-11-25T23:59:59.000Z

214

Ryan Campbell Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas Ryan Campbell Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Lawrence, KS 66045 Requestors must identify: 1. Type of publication 2. Proposed title 3. Specific passages to be quoted 4. Anticipated uses of the passages 5. Publisher's name 6. Expected date of publication ...

Campbell, Ryan; Albin, Tami

2009-12-16T23:59:59.000Z

215

Figure 1: IPA symbols [wikipedia]. Unvoiced Consonants Voiced Consonants Vowels  

E-Print Network [OSTI]

Figure 1: IPA symbols [wikipedia]. Unvoiced Consonants Voiced Consonants Vowels Example Dbet IPA/at H û Example Dbet IPA /th/is D D /b/ee b b /d/og d d /g/ab g g /j/udge J ? /l/ook l l /m/an m m /n/ap n n /r/eal r r plea/s/ure Z Z si/ng/ G N /v/ow v v /w/in w w /y/ou y j /z/oo z z Example Dbet IPA L

Allen, Jont

216

EIA - Annual Energy Outlook 2007 with Projections to 2030 - Market  

Gasoline and Diesel Fuel Update (EIA)

Oil and natural Gas Oil and natural Gas Annual Energy Outlook 2007 with Projections to 2030 Oil and Natural Gas Figure 67. Natural gas consumption by sector, 1990-2030 (trillion cubic feet). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Figure 67. Total natural gas consumption, 1990-2030 (trilliion cubic feet). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Projected Natural Gas Use for Electricity Generation Peaks in 2020 Total natural gas consumption in the United States is projected to increase from 22.0 trillion cubic feet in 2005 to 26.1 trillion cubic feet in 2030 in the AEO2007 reference case. Much of the growth is expected before 2020, with demand for natural gas in the electric power sector growing from 5.8

217

EIA - Annual Energy Outlook 2007 with Projections to 2030 - Market  

Gasoline and Diesel Fuel Update (EIA)

Market Drivers Market Drivers Annual Energy Outlook 2007 with Projections to 2030 Trends in Economic Activity Figure 24. Average annual growth rates of real GDP, labor force, and productivity, 2005-2030 (percent per year). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Figure 25. Average annual inflation, interest, and unemployment rates, 2005-2030 (percent per year). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Strong Economic Growth Is Expected To Continue Through 2030 AEO2007 presents three views of economic growth for the projection period from 2005 through 2030. In the reference case, the Nation’s economic growth, measured in terms of real GDP, is projected to average 2.9 percent

218

A History of the Southeastern Power Administration  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the Distribu teD by us Department of energy southeastern Power Administration 2012 A History of the Southeastern Power Administration 1990-2010 SERVING SOUTHEAST the ii Project contribu tors Sponsor us Department of energy, southeastern Power Administration Contracting Agency us Army corps of engineers, Mobile District Author Patricia stallings, brockington and Associates, inc. Design and Editing john cason and Alicia sullivan, brockington and Associates, inc. iii AcknowleDgeMents The author gratefully acknowledges the efforts of many individuals who contributed to make this history possible. Mrs. Melissa chastain sease initiated the project and worked tirelessly to facilitate an excellent research environment and also established an efficient

219

Celebrating Women's History Month: Marie Curie | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Women's History Month: Marie Curie Women's History Month: Marie Curie Celebrating Women's History Month: Marie Curie March 4, 2011 - 12:30pm Addthis Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science It's Women's History Month and this year's theme, according to the National Women's History Project, is "Our History Is Our Strength." We'll be celebrating that strength all month on the Energy Blog to highlight the remarkable women of science (and the Energy Department!) and their achievements - past, present, and future. (It's also the International Year of Chemistry, so BYOB . . . Bring Your Own Beaker.) It's fitting to begin this celebration with a salute to the first woman to receive a doctorate in France, the discoverer of two elements, the first person to win two Nobel Prizes and the mother of another winner. It's

220

Annual Energy Outlook with Projections to 2025-Market Trends - Market  

Gasoline and Diesel Fuel Update (EIA)

Market Drivers Market Drivers Annual Energy Outlook 2004 with Projections to 2025 Market Trends - Market Drivers Index (click to jump links) Trends in Economic Activity International Oil Markets Figure 38. Average annual growth rates of real GDP and economic factors, 1995-2025 (percent). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Trends in Economic Activity Strong Economic Growth Is Expected To Continue The output of the Nation's economy, measured by gross domestic product (GDP), is projected to grow by 3.0 percent per year between 2002 and 2025 (with GDP based on 1996 chain-weighted dollars) (Figure 38). The projected growth rate is slightly lower than the 3.1-percent rate projected in AEO2003. The labor force is projected to increase by 0.9 percent per year

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

222

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

223

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

224

Microsoft Word - S04932 History final.doc  

Office of Legacy Management (LM)

FUSRAP History of the Chupadera Mesa, NM, Site FUSRAP History of the Chupadera Mesa, NM, Site December 2008 Doc. No. S0493200 (FUSRAP NM.04-5) Page 1 of 9 FUSRAP History of the Chupadera Mesa, NM, Site The following historical summary is provided to document the inclusion of the Chupadera Mesa, NM, Site into the Formerly Utilized Sites Remedial Action Program (FUSRAP). Although no remedial action was required, the site met eligibility criterion and was included under FUSRAP, under which the final radiological surveys were performed. Chupadera Mesa is located north and east of the White Sands Missile Range and downwind of the Trinity test site (Figure1). The Trinity test was the first detonation of a nuclear device. The test occurred on July 16, 1945, at the Trinity Site located within White Sands Missile Range in

225

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

226

Fermilab E866 (NuSea) Figures and Data Plots  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The NuSea Experiment at Fermilab studied the internal structure of protons, in particular the difference between up quarks and down quarks. This experiment also addressed at least two other physics questions: nuclear effects on the production of charmonia states (bound states of charm and anti-charm quarks) and energy loss of quarks in nuclei from Drell-Yan measurements on nuclei. While much of the NuSea data are available only to the collaboration, figures, data plots, and tables are presented as stand-alone items for viewing or download. They are listed in conjunction with the published papers, theses, or presentations in which they first appeared. The date range is 1998 to 2008. To see these figures and plots, click on E866 publications or go directly to http://p25ext.lanl.gov/e866/papers/papers.html. Theses are at http://p25ext.lanl.gov/e866/papers/e866theses/e866theses.html and the presentations are found at http://p25ext.lanl.gov/e866/papers/e866talks/e866talks.html. Many of the items are postscript files.

E866 NuSea Collaboration

227

Figure 1. Rapidly wilting black walnut in the final stage of thousand cankers  

E-Print Network [OSTI]

, and Chihuahua, Mexico (Figure 3). This range appears to coincide largely with the distribution of Arizona walnut

228

Project Completion/Closeout Guide - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

No Related History Exemptions Standards Related to: DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets Cancels: DOE G 413.3-16, Project...

229

The effect of a multivalley energy band structure on the thermoelectric figure of merit  

E-Print Network [OSTI]

value of the thermoelectric figure of merit Z than a similar material which has only a single valleyL-49 The effect of a multivalley energy band structure on the thermoelectric figure of merit D. M A comparison is drawn between the dimensionless thermoelectric figure of merit of a multivalleyed semiconductor

Boyer, Edmond

230

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

231

Microsoft Word - P-12711 Cobscook Bay Project EA.doc  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PROJECT PILOT LICENSE Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 (DOE/EA1916) Maine Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 January 2012 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

232

NETL: Methane Hydrates - DOE/NETL Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thermal Properties of Hydrate – Tool Development Last Reviewed 3/18/2013 Thermal Properties of Hydrate – Tool Development Last Reviewed 3/18/2013 Project Goal The goal of this project is increased understanding of gas hydrate thermal properties through measurements on natural hydrate-bearing sediment cores and hydrate-bearing cores formed within laboratory pressure vessels. Project Performers Eilis Rosenbaum, NETL, Office of Research and Development Ronald Lynn, NETL, RDS/Parsons Dr. David Shaw, Geneva College Project Location National Energy Technology Laboratory, Pittsburgh, PA Background NETL utilizes a modified transient plane source (TPS) shown in Figure 1 using a technique originally developed by Gustafsson [1, 2] in a single-sided configuration (Figure 2). The TPS technique is capable of simultaneously determining both thermal conductivity and thermal

233

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

234

History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

History History History On January 7, 2011, the President signed H.R. 6523 (111th), the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (http://www.govtrack.us/congress/bills/111/hr6523) which became Public Law 111-384. Section 3124 specifically states, "The Secretary of Energy may establish a program to permit the establishment of energy parks on former defense nuclear facilities" (50 U.S.C. 2814). In response, on February 17, 2011, the Department of Energy (DOE) established a Task Force on the ARI to address the legislation in detail. The purpose of the task force was to implement asset revitalization efforts in response to Congressional direction, and to develop recommendations for a continued formalized asset revitalization program. The task force achieved this through facilitating

235

PAFC History and Successes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PAFC History and Successes PAFC History and Successes John Ferro Manager Product Development john.ferro@utcpower.com 2 2 AGENDA Company overview and history System description and applications Failure modes and life analysis Summary 3 3 Research Center Hamilton Sundstrand Pratt & Whitney Sikorsky UTC Power Otis Carrier UTC Fire & Security UNITED TECHNOLOGIES CORPORATION 18 th largest U.S. manufacturer (2009 list, Industry Week) 37 th largest U.S. corporation (2009 list, Fortune) 61 st largest publicly held manufacturer in the world (2009 list, Industry Week) Revenues: $58.7 billion (2008) Commercial & Residential Building Systems, Aerospace & Transportation, Industrial systems 4 UTC POWER Markets Transportation fuel cells Stationary fuel cells Global sales 5 continents 19 countries Space & defense

236

SRS - History Highlights  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 SEARCH GO Side Menu Spacer SRS Mission & Vision Where We Are SRS History Fact Sheets Tour SRS Contact SRS SRS Home SRS History Highlights The Savannah River Site was constructed during the early 1950s to produce the basic materials used in the fabrication of nuclear weapons, primarily tritium and plutonium-239, in support of our nation's defense programs. Five reactors were built to produce these materials. Also built were a number of support facilities including two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. If you wish to view an in-depth history (1950-2000), please explore SRS at Fifty, our 50th anniversary book. Browse by Era: 1950s * 1960s * 1970s * 1980s * 1990s * 2000s * 2010s

237

History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

History History History Although they are tiny, atoms have a large amount of energy holding their nuclei together. Certain isotopes of some elements can be split and will release part of their energy as heat. This splitting is called fission. The heat released in fission can be used to help generate electricity in powerplants. Uranium-235 (U-235) is one of the isotopes that fissions easily. During fission, U-235 atoms absorb loose neutrons. This causes U-235 to become unstable and split into two light atoms called fission products. The combined mass of the fission products is less than that of the original U-235. The reduction occurs because some of the matter changes into energy. The energy is released as heat. Two or three neutrons are released along with the heat. These neutrons may hit other

238

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

239

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Broader source: Energy.gov (indexed) [DOE]

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

240

Oral Histories: Merril Eisenbud  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 HUMAN RADIATION STUDIES: REMEMBERING THE EARLY YEARS Oral History of Merril Eisenbud Conducted January 26, 1995 United States Department of Energy Office of Human Radiation Experiments May 1995 CONTENTS Foreword Short Biography Early Days as an Industrial Hygienist Hired as AEC's First Industrial Hygienist Insuring Atomic Workers Setting up the AEC's Health and Safety Laboratory Worker's Compensation History Contamination and Industrial Worker Education Federal Versus State Responsibility for Materials Production Safety Plant Safety and the Community Monitoring Radioactive Fallout Radiation and Cancer Rates Safety of the Nuclear Industry Use of Children in Research Developing Thyroid Radiation Counters Secrecy, Louis Strauss, and the Bravo Test Nuclear Test Fallout Studies

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

A1. Form EIA-176 Figure Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Form EIA-176 Form EIA-176 Figure Energy Information Administration / Natural Gas Annual 1996 214 EIA-176, ANNUAL REPORT OF NATURAL AND SUPPLEMENTAL GAS SUPPLY AND DISPOSITION, 19 PART IV: SUPPLY OF NATURAL AND SUPPLEMENTAL GAS RECEIVED WITHIN OR TRANSPORTED INTO REPORT STATE RESPONDENT COPY Page 2 PART III: TYPE OF COMPANY AND GAS ACTIVITIES OPERATED IN THE REPORT STATE 1.0 Type of Company (check one) 1.0 Control No. 2.0 Company Name 3.0 Report State 4.0 Resubmittal EIA Date: a b c d e Investor owned distributor Municipally owned distributor Interstate pipeline Intrastate pipeline Storage operator f g h i j SNG plant operator Integrated oil and gas Producer Gatherer Processor k Other (specify) 2.0 Gas Activities Operated On-system Within the Report State (check all that apply) a b c d e Produced Natural Gas

242

BRAHMS (Broad Range Hadron Magnetic Spectrometer) Figures and Data Archive  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The BRAHMS experiment was designed to measure charged hadrons over a wide range of rapidity and transverse momentum to study the reaction mechanisms of the relativistic heavy ion reactions at the Relativistic Heavy Ion Collider at Brookhaven National Laboratory and the properties of the highly excited nuclear matter formed in these reactions. The experiment took its first data during the RHIC 2000 year run and completed data taking in June 2006. The BRAHMS archive makes publications available and also makes data and figures from those publications available as separate items. See also the complete list of publications, multimedia presentations, and related papers at http://www4.rcf.bnl.gov/brahms/WWW/publications.html

243

STAR (Solenoidal Tracker at RHIC) Figures and Data  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The primary physics task of STAR is to study the formation and characteristics of the quark-gluon plasma (QGP), a state of matter believed to exist at sufficiently high energy densities. STAR consists of several types of detectors, each specializing in detecting certain types of particles or characterizing their motion. These detectors work together in an advanced data acquisition and subsequent physics analysis that allows final statements to be made about the collision. The STAR Publications page provides access to all published papers by the STAR Collaboration, and many of them have separate links to the figures and data found in or supporting the paper. See also the data-rich summaries of the research at http://www.star.bnl.gov/central/physics/results/. [See also DDE00230

The STAR Collaboration

244

UMTRA Ground Water Project  

Office of Legacy Management (LM)

... 7 Figure 3. Uranium Distribution from April 2013 Sampling at the Gunnison, Colorado, Processing Site ......

245

Wolf's History of Astronomy  

Science Journals Connector (OSTI)

... THE History of Astronomy, by Prof. Rudolf Wolf, of Zurich, a volume of 800 pages issued ... student. The production of such a work, involving an outline of the progress of astronomy from the earliest times to the present period, must have been a labour of ...

J. R. HIND

1878-01-31T23:59:59.000Z

246

Early History of Magnetism  

Science Journals Connector (OSTI)

... 2, Dr. J. B. Kramer read a paper on The Early History of Magnetism, in which he discussed the various accounts of the first discovery of a magnet ... accounts of the first discovery of a magnet, and the development of the science of magnetism down to A.D. 1600. His remarks were divided into five sections, the ...

1932-03-19T23:59:59.000Z

247

Exploring Mars' Climate History  

E-Print Network [OSTI]

Exploring Mars' Climate History #12;2 Mars Reconnaissance Orbiter ESA Mars Express (NASA: MARSIS by studying the solar wind and other interactions with the Sun. #12;The solar wind is a high-speed stream of electrons and protons released from the Sun. #12;High-energy photons (light) stream constantly from the Sun

248

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

249

2013 Global Carbon Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2013 Global Carbon Project 2013 Global Carbon Project DOI: 10.3334/CDIAC/GCP_2013_V1.1 image 2013 Budget v1.1 (November 2013) image 2013 Budget v1.3 (December 2013, contains typographical corrections to 2011 Australia emissions from v1.1 and corrections to the 2011 Australia transfer and consumption emissions from v1.2) image image image image Global Carbon Dioxide Emissions to Reach 36 Billion Tonnes in 2013 Global emissions of carbon dioxide from the combustion of fossil fuels will reach 36 billion tonnes for the year 2013. "This is a level unprecedented in human history," says CSIRO's Dr Pep Canadell, Executive-Director of the Global Carbon Project (GCP) and co-author of a new report. Global emissions due to fossil fuel alone are set to grow this year at a slightly lower pace of 2.1% than the average 3.1% since 2000, reaching 36

250

EIA - Annual Energy Outlook 2007 with Projections to 2030 - Market  

Gasoline and Diesel Fuel Update (EIA)

Electricity Electricity Annual Energy Outlook 2007 with Projections to 2030 Electricity Figure 53. Annual electricity sales by sector, 1980-2030 (billion kilowatthours). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Figure 54. Electricity generation by fuel, 2005 and 2030 (billion kilowatthours). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Continued Growth in Electricity Use Is Expected in All Sectors Total electricity sales increase by 41 percent in the AEO2007 reference case, from 3,660 billion kilowatthours in 2005 to 5,168 billion kilowatthours in 2030. The largest increase is in the commercial sector (Figure 53), as service industries continue to drive growth. Electricity

251

New Book Updates INL's History, Documents a Decade of Transformation |  

Broader source: Energy.gov (indexed) [DOE]

Book Updates INL's History, Documents a Decade of Book Updates INL's History, Documents a Decade of Transformation New Book Updates INL's History, Documents a Decade of Transformation June 21, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Tim Jackson 208-526-8484 The U.S. Department of Energy is releasing an update to the history of the Idaho National Laboratory, documenting a decade of transformation at the laboratory, and a "decade of doing" for the Idaho Cleanup Project. "Transformed: A Recent History of the Idaho National Laboratory, 2000 to 2010," was commissioned to update the highly popular, "Proving the Principle," the book that was issued in 1999 to document the first 50 years of the lab. "During the first decade of this century, Idaho National Laboratory got a

252

EIA - Annual Energy Outlook 2007 with Projections to 2030 - Market  

Gasoline and Diesel Fuel Update (EIA)

Coal Production Coal Production Annual Energy Outlook 2007 with Projections to 2030 Coal Production Figure 85. Cellulose ethanol production, 2005-2030 (billion gallons per year). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Figure 86. Coal production by region, 1970-2030 (quadrillion Btu). Need help, contact the National Energyi Information Center at 202-586-8800. figure data Lower Costs, Greater Demand Could Spur Cellulose Ethanol Production For AEO2007, two alternative ethanol cases examine the potential impact on ethanol demand of lower costs for cellulosic ethanol production, in combination with policies that increase sales of FFVs [170]. The reference case projects that 10.5 percent of new light-duty vehicles will be capable

253

About Fermilab - History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

What is Fermilab? What is Fermilab? what is Fermilab main page | mission | history | Enrico Fermi History - Wilson Hall Beauvais Cathedral A daring achievement of Gothic architecture, the Saint-Pierre Cathedral of Beauvais, France helped inspire the distinctive design of Wilson Hall. The Cathedral (A.D. 1225-1568) was never completed westward of the choir and transepts, and the site of the proposed nave is partly occupied by the Romanesque church known as the "Basse oeuvre" ("low work"). The roof fell (A.D. 1284); the choir was reconstructed and strengthened by additional piers (A.D. 1337-47), and in the 16th century the transepts were built. The height of the vault (157 ft., 6 ins.) is the loftiest in Europe, and measures about three and a half times its span. One of the most daring

254

BNL | Our History: Accelerators  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

> See also: Reactors > See also: Reactors A History of Leadership in Particle Accelerator Design Cosmotron Cosmotron (1952-1966) Early in Brookhaven Lab history, the consortium of universities responsible for founding the new research center, decided that Brookhaven should provide leading facilities for high energy physics research. In April 1948, the Atomic Energy Commission approved a plan for a proton synchrotron to be built at Brookhaven. The new machine would accelerate protons to previously unheard of energies-comparable to the cosmic rays showering the earth's outer atmosphere. It would be called the Cosmotron. The Cosmotron was the first accelerator in the world to send particles to energies in the billion electron volt, or GeV, region. The machine reached its full design energy of 3.3 GeV in 1953.

255

RMOTC - About Us - History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History Teapot Dome Scandal Teapot Dome was the popular name for the scandal during the administration of U.S. President Warren G. Harding. The scandal, which involved the secret leasing of naval oil reserve lands to private companies, was first revealed to the general public in 1924 after findings by a committee of the U.S. Senate. Teapot Rock, From which the famous Teapot Dome derives its name The creation of the Naval Petroleum Reserves originated with the growth of federal conservation policy under presidents Theodore Roosevelt, William Howard Taft, and Woodrow Wilson. The reserves were tracts of public land where oil should be kept in its natural reservoirs for the future use of the Navy. "Teapot Dome" originally acquired its name from a rock nearby

256

Reading Comprehension - Atomic History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Atomic History Atomic History A Greek philosopher named Democritus said that all atoms are small, hard particles. He thought that atoms were made of a single material formed into different shapes and sizes. The word " _________ element compound mixture atom " is derived from the Greek word "atomos" which means "not able to be divided." In 1803, John Dalton, a school teacher, proposed his atomic theory. Dalton's theory states that elements (substances composed of only one type of _________ molecules ions atom ) combine in certain proportions to form _________ compounds atoms mixtures elements . In 1897, a British scientist named J. J. Thomson experimented with a cathode-ray tube which had a positively charged plate. The plate attracted negatively charged particles that we now call _________ protons neutrons

257

Klondike III / Biglow Canyon Wind Integration Project  

Broader source: Energy.gov (indexed) [DOE]

Proposed Action and Alternatives 2-3 Proposed Action and Alternatives 2-3 Figure 1 Proposed 230-kV Towers and Rights-of-Way Klondike III/Biglow Canyon Wind Integration Project Bonneville Power Administration Proposed Action and Alternatives 2-4 Figure 1, continued CUMULATIVE IMPACTS ANALYSIS, PROPOSED WIND PROJECTS, SHERMAN COUNTY, WASHINGTON March 2006 WEST, Inc. 32 Figure 1. Region map of wind projects proposed for Sherman County. D e s c h u t e s Ri ver C a n y o n C o l u m b ia R i v e r Hwy 19 H w y 2 0 6 H w y 9 7 I 8 4 Grass Valley Moro Wasco Biggs Arlington Condon Fourmile Canyon McDonald Ferry Biggs Junction Deschutes River Crossing The Dalles Complex RM 15.9-16.8 RM 40 Sherman Co Wasco Co G i l l i a m C o Gilliam Co Morrow Co Rowena Plateau Historic Columbia River Highway John D a y R i v e r C a n y o n P:\B\BPAX00000324\0600INFO\GS\arcmap\figures\visiblity_tech_report\fig2_visual_resources_or.mxd January 9, 2006

258

NERSC Systems History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History of Systems History of Systems History of Systems Established in 1974 at Lawrence Livermore National Laboratory, NERSC was moved to Berkeley Lab in 1996 with a goal of increased interactions with the UC Berkeley campus. NERSC Systems System Name Installed System Type CPU Computational Pool Interconnect Disk (TB) Avg. Power Linpack HPL/ Top Rank Peak GFlops/s Type Speed Nodes SMP Size Total Cores Aggregate Memory (GB) Avg. Memory/ CPU Edison 2013 Cray XC30 Xeon 12-Core 2.3 GHz 5,200 24 124,800 332,800 2.67GB Hopper 2010 Cray XE6 Opteron Hex-Core 2.1 GHz 6,384 24 153,216 216,832 1.3 GB Gemini 2,000 1,054,000 (5) 1,054,000 Carver 2010 IBM iDataPlex Intel Nehalem Quad-Core 2.6 GHz 400 8 3,200 9,600 3 GB 4X QDR InfiniBand NGF 36,856 (322) 42,656

259

Manhattan Project: The Manhattan Project and the Second World War,  

Office of Scientific and Technical Information (OSTI)

Oak Ridgers celebrate V-J Day THE MANHATTAN PROJECT AND THE SECOND WORLD WAR Oak Ridgers celebrate V-J Day THE MANHATTAN PROJECT AND THE SECOND WORLD WAR (1939-1945) Events > Dawn of the Atomic Era, 1945 The War Enters Its Final Phase, 1945 Debate Over How to Use the Bomb, Late Spring 1945 The Trinity Test, July 16, 1945 Safety and the Trinity Test, July 1945 Evaluations of Trinity, July 1945 Potsdam and the Final Decision to Bomb, July 1945 The Atomic Bombing of Hiroshima, August 6, 1945 The Atomic Bombing of Nagasaki, August 9, 1945 Japan Surrenders, August 10-15, 1945 The Manhattan Project and the Second World War, 1939-1945 The atomic bombings of Hiroshima and Nagasaki and the surrender of Japan were the last acts of the Second World War. The most destructive weapon in the history of combat had helped bring an end to the most destructive conflict in human history.

260

history | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

highlights of the site's history now is available for viewing on the Y-12 public Web site at http:www.y12.doe.gov Office of Secure Transportation History Since 1947,...

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The Tevatron Hadron Collider: A short history  

SciTech Connect (OSTI)

The subject of this presentation was intended to cover the history of hadron colliders. However this broad topic is probably better left to historians. I will cover a much smaller portion of this subject and specialize my subject to the history of the Tevatron. As we will see, the Tevatron project is tightly entwined with the progress in collider technology. It occupies a unique place among accelerators in that it was the first to make use of superconducting magnets and indeed the basic design now forms a template for all machines using this technology. It was spawned in an incredibly productive era when new ideas were being generated almost monthly and it has matured into our highest energy collider complete with two large detectors that provide the major facility in the US for probing high Pt physics for the coming decade.

Tollestrup, A.V.

1994-11-01T23:59:59.000Z

262

Science Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

263

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht

1980-01-01T23:59:59.000Z

264

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

265

Hydropower Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

266

figures for inverse problem paper in 3d - Department of Mathematics ...  

E-Print Network [OSTI]

FIGURES FOR INVERSE PROBLEM PAPER IN 3D. JUAN E. SANTOS. Departamento de Geof sica Aplicada, Facultad de Ciencias Astron omicas y Geof sicas,.

santos

1910-20-20T23:59:59.000Z

267

RECOUNTING HISTORY THROUGH RADIOASSAY  

SciTech Connect (OSTI)

This paper describes a proposed method for using historical documentation to identify unknown wastes resulting from retrieving suspect transuranic (TRU) waste. Identification is accomplished by a historical review of radionuclides identified by radioassay, along with the project controls used to ensure an accurate segregation of TRU from low-level waste (LLW). This paper presents an historical perspective on the identification of radionuclides at the Hanford Site from various waste generators of suspect TRU waste with an emphasis on the Data Quality Objectives (DQO's) and project controls used to ensure the waste is properly classified as TRU or LLW.

JASEN, W.G.

2005-12-21T23:59:59.000Z

268

Hanford Overview and History - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About Us > Hanford Overview and History About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Overview and History Email Email Page | Print Print...

269

Kami Oral History  

E-Print Network [OSTI]

this interview the way that I start off all the oral histories which is, Tell me where you were born and when. KAMI: I was born in Salt Lake City, Utah in August, 1950. And my father was at the University of Utah in school. And they lived in Layton, so we.... But yeah, I went across the country and I danced around and(laugh) and I love Salt Lake. And I didn't appreciate Salt Lake then the way I do now. I've really come tobut I had good friends in the dorms and, yeah I didn'tI was never homesick, never...

Albin, Tami; Kami

2010-01-11T23:59:59.000Z

270

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

271

URAT: astrometric requirements and design history  

E-Print Network [OSTI]

The U.S. Naval Observatory Robotic Astrometric Telescope (URAT) project aims at a highly accurate (5 mas), ground-based, all-sky survey. Requirements are presented for the optics and telescope for this 0.85 m aperture, 4.5 degree diameter field-of-view, specialized instrument, which are close to the capability of the industry. The history of the design process is presented as well as astrometric performance evaluations of the toleranced, optical design, with expected wavefront errors included.

Zacharias, N; Rakich, A; Epps, H

2006-01-01T23:59:59.000Z

272

Chapter 8 - The history of nuclear energy  

Science Journals Connector (OSTI)

Abstract This chapter reviews the history related to nuclear energy beginning with scientific investigations in the late 1800s that led to the discovery of subatomic particles and both atomic and nuclear structure. Those research efforts spawned the discovery of fission. The Manhattan Project to develop an atomic bomb then accelerated the knowledge base of nuclear phenomena. After World War II, the Atomic Energy Commission was established and later the International Atomic Energy Agency. Research and development efforts led to the deployment of the first nuclear power plants. This chapter ends by addressing the controversies surrounding nuclear energy in the late twentieth century.

Raymond L. Murray; Keith E. Holbert

2015-01-01T23:59:59.000Z

273

Annual Energy Outlook with Projections to 2025 - Market Trends- Carbon  

Gasoline and Diesel Fuel Update (EIA)

Carbon Dioxide Emissions Carbon Dioxide Emissions Annual Energy Outlook 2005 Market Trends - Carbon Dioxide Emissions Higher Energy Consumption Forecast Increases Carbon Dioxide Emissions Figure 110. Carbon dioxide emissions by sector and fuel, 2003 and 2025 (million metric tons). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Carbon dioxide emissions from energy use are projected to increase on average by 1.5 percent per year from 2003 to 2025, to 8,062 million metric tons (Figure 110). Emissions per capita are projected to grow by 0.7 percent per year. New carbon dioxide mitigation programs, more rapid improvements in technology, or more rapid adoption of voluntary programs could result in lower emissions levels than projected here.

274

Annual Energy Outlook with Projections to 2025 - Market Trends  

Gasoline and Diesel Fuel Update (EIA)

Market Drivers Market Drivers Annual Energy Outlook 2005 Market Trends - Market Drivers Strong Economic Growth Is Expected To Continue Figure 35. Average annual growth rates of real GDP and economic factors, 1995-2025 (percent). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data The output of the Nation’s economy, measured by GDP, is projected to grow by 3.1 percent per year between 2003 and 2025 (with GDP based on 2000 chain-weighted dollars) (Figure 35). The labor force is projected to increase by 0.9 percent per year between 2003 and 2025. Labor productivity growth in the nonfarm business sector is projected at 2.2 percent per year. Compared with the second half of the 1990s, the rates of growth in GDP and nonfarm employment were lower from 2000 through 2002. Economic growth has

275

Annual Energy Outlook with Projections to 2025-Market Trends - Carbon  

Gasoline and Diesel Fuel Update (EIA)

Carbon Dioxide Emissions Carbon Dioxide Emissions Annual Energy Outlook 2004 with Projections to 2025 Market Trends - Carbon Dioxide Emissions Index (click to jump links) Carbon Dioxide Emissions Emissions from Electricity Generation Carbon Dioxide Emissions Higher Energy Consumption Forecast Increases Carbon Dioxide Emissions Figure 115. Carbon dioxide emissions by sector and fuel, 1990-2025 (million metric tons). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Carbon dioxide emissions from energy use are projected to increase on average by 1.5 percent per year from 2002 to 2025, to 8,142 million metric tons (Figure 115). Emissions per capita are projected to grow by 0.7 percent per year from 2002 to 2025. Carbon dioxide emissions in the residential sector, including emissions

276

West Valley Demonstration Project: A Short History and Status  

Broader source: Energy.gov [DOE]

Presentation made by Bryan C. Bower for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

277

Los Angeles Museum of History, Science and Art/  

E-Print Network [OSTI]

Public Works of Art Project/ Works Progress Administration LouisaEtcheverryKing University of California2 3 #12;16 17 Los Angeles Museum of History, Science and Art/ Los Angeles County Museum of Art Guild University of Southern California CoritaKent MitchellBobrick AllanAdler Architectural

278

Technology Transfer award funding data* Figure 1. Current Technology Transfer awards  

E-Print Network [OSTI]

6 1 4 3 48 23 30 10 Technology Transfer award funding data* Figure 1. Current Technology Transfer awards Numbers represent active grants as at 1 October 2013 Figure 2. Technology Transfer award Transfer funding division. In the 2012/13 financial year Technology Transfer approved awards worth a total

Rambaut, Andrew

279

23 Figure 3.1: Color transition from purple/maroon argillites into bright red  

E-Print Network [OSTI]

;#12;#12;#12;#12;#12;#12;#12;#12;23 Figure 3.1: Color transition from purple/maroon argillites into bright red argillites. This transition weathering, possibly sideritic layer in the lower part of the picture. The fine grained overlying red Island Section, lower maroon and purple part in red unit (level: 9 meter; Figure 3.3); south shore Gull

Kidd, William S. F.

280

Figure 1:Energy Consumption in USg gy p 1E Roberts, Energy in US  

E-Print Network [OSTI]

Fluctuations and Global Events 14E Roberts, Energy in US DOE: 2011 Vehicle Technology Market Report #12;Figure 15: Effect of Oil Prices on US Economy 15E Roberts, Energy in US DOE: 2011 Vehicle Technology MarketFigure 1:Energy Consumption in USg gy p 2008 1E Roberts, Energy in US Source: www.eia.gov #12

Sutton, Michael

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001  

E-Print Network [OSTI]

, with Brazil having the largest share (Figure 2). This has meant that the share of hydroelectric power

282

Data Report Project Shoal Area Churchill County, Nevada  

Office of Legacy Management (LM)

505 505 UCC-700 DATA REPORT PROJECT SHOAL AREA CHURCHILL COUNTY, NEVADA DOE Nevada Operations Office Las Vegas, Nevada July 1998 DATA REPORT PROJECT SHOAL AREA CHURCHILL COUNTY, NEVADA Approved by: Date: Monica Sanchez, Project Manager Off-Sites Subproject Approved by: Date: Runore C. Wycoff, Project Manager Nevada Environmental Restoration Project i Table of Contents List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2 Scope of Work .

283

History | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

History History New Brunswick Laboratory (NBL) NBL Home About Organization Chart .pdf file (189KB) Points of Contact (POCs) History Directions Jobs Programs Certified Reference Materials (CRMs) Training Categorical Exclusion Determinations News Contact Information New Brunswick Laboratory U.S. Department of Energy Building 350 9800 South Cass Avenue Argonne, IL 60439-4899 P: (630) 252-2442 (NBL) P: (630) 252-2767 (CRM sales) F: (630) 252-6256 E: usdoe.nbl@ch.doe.gov About History Print Text Size: A A A RSS Feeds FeedbackShare Page NBL was established by the Atomic Energy Commission in 1949 in New Brunswick, NJ. It was initially staffed by scientists from the National Bureau of Standards that had contributed to the measurement science of nuclear materials for the Manhattan Project. NBL's initial mission was to

284

History | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History History About Organization Budget Field Offices Federal Advisory Committees History Former Directors Scientific and Technical Information Honors & Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 History Print Text Size: A A A RSS Feeds FeedbackShare Page Origins The origins of the Office of Science trace to the Manhattan Project. The all-out effort to create the world's first nuclear weapon created a vast research and development apparatus under the control of the War Department's Army Corps of Engineers. The classified nature and sprawling logistical and technical demands of this work created large, multi-purpose facilities that became the nation's first national laboratories.

285

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

286

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

287

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

288

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

289

Discontinued Projects  

Broader source: Energy.gov [DOE]

This page lists projects that received a loan or a loan guarantee from DOE, but that are considered discontinued by LPO for one of several reasons.

290

project management  

National Nuclear Security Administration (NNSA)

the Baseline Change Proposal process. Two 400,000-gallon fire protection water supply tanks and associated pumping facilities were added. Later in the project, an additional...

291

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Incentive Payment - The ESIP works with utility, industry, and BPA to complete the measurement and verification, reporting and development of a custom project completion...

292

History | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne's Nobelists Argonne's Nobelists Three Argonne physicists have been honored with Nobel Prizes: Enrico Fermi, Argonne's founding director, won the 1938 Nobel Prize in physics for his demonstrations of the existence of new radioactive elements produced by neutron irradiation and for his related discovery of nuclear reactions brought about by slow neutrons. Maria Goeppert Mayer shared the 1963 Nobel Prize in physics. While working at Argonne in 1948, she developed the "nuclear shell model" to explain how neutrons and protons within atomic nuclei are structured. Alexei A. Abrikosov shared the 2003 Nobel Prize in physics for research on condensed-matter physics and superconductivity. Our history sparked the nation's future AVIDAC, Argonne's first digital computer, began operation in January 1953.

293

Whistling Ridge Energy Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Whistling Ridge Energy Project Bonneville Power...

294

A history of the neutron  

Science Journals Connector (OSTI)

A history of the neutron ... Describes some of the individuals and the work they did leading to the discovery of the neutron. ...

Vasilis Lavrakas

1952-01-01T23:59:59.000Z

295

History of Proton Linear Accelerators  

E-Print Network [OSTI]

much. References 1. Linear Accelerators, edited by P. M .at the 1986 Linear Accelerator Conference, SLAC, Stanford,HISTORY OF PROTON LINEAR ACCELERATORS Luis W. Alvarez TWO-

Alvarez, Luis W.

1987-01-01T23:59:59.000Z

296

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

297

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

298

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

299

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

300

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

302

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

303

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

304

A HISTORY OF EMATS  

Science Journals Connector (OSTI)

This paper was prepared for a Special Session in the 34th Annual Review of Quantitative NDE devoted to Applications of EMATs. As such it reviews the past history of electromagnetic induction of vibrations in metals with special attention to the application to nondestructive testing. The first patent describing the use of Electromagnetic Acoustic Transducers (EMATs) to replace the commonly used piezoelectric transducer was in 1969 but their first appearance in the scientific literature was in 1939 when the principles were applied to exciting and detecting the longitudinal resonance modes of bars of brass. The first true application to nondestructive testing was an R&D program sponsored by the American Gas Association to develop a device for inspecting buried gas pipelines for stress corrosion cracks in the early 1970's. During this same time period theoretical models to describe the transduction mechanism appeared and led to the engineering of solutions to NDT and NDE problems that could not be accomplished with piezoelectric devices. The papers in the session to follow this historical summary show how the field has developed over the past 30 years and expose an impressive array of applications to quantitative nondestructive evaluation (QNDE) practices.

George Alers

2008-01-01T23:59:59.000Z

305

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

306

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

307

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

308

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

309

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

310

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

311

Our History | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Our History Our History Our History Our History The history of Office of Electricity Delivery and Energy Reliability (OE) begins in August 2003, when the Department created two offices to provide focus in several critical areas: the Office of Electric Transmission and Distribution (TD), which included elements from the DOE Energy Efficiency and Renewable Energy office and the DOE Policy and International Affairs office, to advance the technologies needed to ensure a reliable, robust and modern U.S. electricity grid; and the Office of Energy Assurance (EA), to coordinate Federal response activities within the energy sector during energy disruptions and developed strategies to harden infrastructure against such disruptions. On August 14, 2003, large portions of the Midwest and Northeast United

312

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

313

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

314

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

315

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

316

LUCF Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

317

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

318

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

319

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

320

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

322

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

323

Integrated Data Base: Status and waste projections  

SciTech Connect (OSTI)

The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs.

Klein, J.A.

1990-01-01T23:59:59.000Z

324

Annual Energy Outlook with Projections to 2025 - Market Trends- Electricity  

Gasoline and Diesel Fuel Update (EIA)

Electricity Demand and Supply Electricity Demand and Supply Annual Energy Outlook 2005 Market Trends - Electricity Demand and Supply Continued Growth in Electricity Use Is Expected in All Sectors Figure 66. Annual electricity sales by sector, 1970-2025 (billion kilowatthours). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Total electricity sales are projected to increase at an average annual rate of 1.9 percent in the AEO2005 reference case, from 3,481 billion kilowatthours in 2003 to 5,220 billion kilowatthours in 2025 (Figure 66). From 2003 to 2025, annual growth in electricity sales is projected to average 1.6 percent in the residential sector, 2.5 percent in the commercial sector, and 1.3 percent in the industrial sector.

325

Annual Energy Outlook with Projections to 2025 - Market Trends- Energy  

Gasoline and Diesel Fuel Update (EIA)

Energy Demand Energy Demand Annual Energy Outlook 2005 Market Trends - Energy Demand Figure 42. Energy use per capita and per dollar of gross domestic product, 1970-2025 (index, 1970 = 1). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Average Energy Use per Person Increases in the Forecast Energy intensity, as measured by energy use per 2000 dollar of GDP, is projected to decline at an average annual rate of 1.6 percent, with efficiency gains and structural shifts in the economy offsetting growth in demand for energy services (Figure 42). The projected rate of decline falls between the average rate of 2.3 percent from 1970 through 1986, when energy prices increased in real terms, and the 0.7-percent rate from 1986 through

326

Annual Energy Outlook 2006 with Projections to 2030 - Market Trends -  

Gasoline and Diesel Fuel Update (EIA)

Market Trends - Market Drivers Market Trends - Market Drivers Annual Energy Outlook 2006 with Projections to 2030 Strong Economic Growth Is Expected To Continue Through 2030 Figure 24. Average annual growth rates of real GDP, labor frce, and productivity in three cases, 2004-2030 (percent per year). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data AEO2006 presents three views of economic growth for the forecast period from 2004 through 2030. Although probabilities are not assigned, the reference case reflects the most likely view of how the economy will unfold over the period. In the reference case, the Nation’s economic growth, measured in terms of real GDP based on 2000 chain-weighted dollars, is projected to average 3.0 percent per year (Figure 24). The labor force is

327

Plasmonic Figures of Merit in a Doped Graphene Sheet | MIT-Harvard...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plasmonic Figures of Merit in a Doped Graphene Sheet May 15, 2014 at 2pm36-428 Marco Polini NEST, Istituto Nanoscienze-CNR and Scuola Normale Superiore di Pisa MarcoPolini...

328

tree cookie (tr kook) n. a cross sectional slice of a trunk or branch. The concentric rings tell not only the age of that part of the tree, but also a story about the environmental conditions, history, and  

E-Print Network [OSTI]

investments. Their role in the economy, society and ecology are real and certain. Your impact as a citizen analysts are projecting further increases in the future. ANR-33 #12;TREE Cookies Etc.Page 2 of 6 Figure 1.gov/national/nipaweb. Figure 3: Percentage of U.S. GDP directly derived from housing (source: National Association of Home

Liskiewicz, Maciej

329

Revolutionizing history education : using augmented reality games to teach histories  

E-Print Network [OSTI]

In an ever-changing present of multiple truths and reconfigured histories, people need to be critical thinkers. Research has suggested the potential for using augmented reality (AR) games- location-based games that use ...

Schrier, Karen L

2005-01-01T23:59:59.000Z

330

UCD School of History & Archives Student Handbook  

E-Print Network [OSTI]

UCD School of History & Archives Student Handbook 2014-2015 This handbook is relevant for all Students study history? Can Evening Arts students study history? How does the School of history School of History and Archives UCD: Student Handbook, 2014-15 2 #12;6. The ECTS credit system How are my

331

NEPA History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

History History NEPA History Selected documents providing historical information on NEPA. June 14, 2012 Federal Register Notices for DOE NEPA Guidelines and Regulations Historical compilation of Federal Register notices for DOE NEPA guidelines and regulations. December 31, 2009 Presidential Proclamation on the 40th Anniversary of the National Environmental Policy Act Proclamation of President Obama to "call upon all executive branch agencies to promote public involvement and transparency in their implementation of the National Environmental Policy Act." July 1, 1999 EPA's Section 309 Review: The Clean Air Act and NEPA This document discusses Section 309 of the Clean Air Act, which authorizes the Environmental Protection Agency to review certain proposed actions of

332

Fisher Research and the Kings River Sustainable Forest Ecosystems Project  

E-Print Network [OSTI]

of the Sierra National Forest, Fresno County, California, with fieldwork beginning in 1994 (Verner and Figure 1--The Kings River administrative study area in the Sierra National Forest in central California includesFisher Research and the Kings River Sustainable Forest Ecosystems Project: Current Results

Standiford, Richard B.

333

Project funded under the Socio-economic Sciences and Humanities  

E-Print Network [OSTI]

1 Project funded under the Socio-economic Sciences and Humanities Can home ownership contribute real increases everywhere. What this translates into, in terms of an exact amount of housing wealth. Over the EU25 as a whole, housing equity is some 40 per cent higher than total GDP, the figure being

Birmingham, University of

334

Preparing for Project Implementation Financing Project Implementation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

335

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

336

Project Homepage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Middle School Home Energy Audit Middle School Home Energy Audit Project Homepage NTEP Home - Project Homepage - Teacher Homepage - Student Pages Abstract: This set of lessons provides an opportunity for midlevel students to gain a basic understanding of how energy is turned into power, how power is measured using a meter, the costs of those units and the eventual reduction of energy consumption and cost to the consumer. Introduction to Research: By conducting energy audits of their own homes and completing exercises to gain baclground information, students begin to see the importance of energy in their daily lives. By using the Internet as a research tool, students gain develop research skills as they gain knowledge for their project. They use e-mail to collaborate with energy experts and share results with other

337

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

338

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

339

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

340

Research projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Yuan » Research projects Yuan » Research projects Research projects Research Interests Scientific computing, domain decomposition methods Linear solvers for sparse matrices Computational plasma physics Grid generation techniques GPU computing Current Research PDSLin: A hybrid linear solver for large-scale highly-indefinite linear systems The Parallel Domain decomposition Schur complement based Linear solver (PDSLin), which implements a hybrid (direct and iterative) linear solver based on a non-overlapping domain decomposition technique called chur complement method, and it has two levels of parallelism: a) to solve independent subdomains in parallel and b) to apply multiple processors per subdomain. In such a framework, load imbalance and excessive communication lead to the performance bottlenecks, and several techniques are developed

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

342

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

343

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

344

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

345

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

346

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

347

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

348

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

349

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

350

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

351

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

352

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

353

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

354

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

355

EM History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM History EM History EM History Before (left) and after (right) photos of the Hanford site's F Reactor during operations in 1956 and in 2012, when EM and its contractors completed cleanup there. It was the first reactor area at the 586-square-mile Hanford site to be fully remediated. Before (left) and after (right) photos of the Hanford site's F Reactor during operations in 1956 and in 2012, when EM and its contractors completed cleanup there. It was the first reactor area at the 586-square-mile Hanford site to be fully remediated. EM's HISTORY (1989 - present) Fifty years of nuclear weapons production and energy research generated millions of gallons of liquid radioactive waste, millions of cubic meters of solid radioactive wastes, thousands of tons of spent nuclear fuel and

356

HFIR History - ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home › Facilities › HFIR › History Home › Facilities › HFIR › History History of HFIR HFIR was constructed in the mid-1960s to fulfill a need for the production of transuranic isotopes (i.e., "heavy" elements such as plutonium and curium). Since then its mission has grown to include materials irradiation, neutron activation, and, most recently, neutron scattering. In 2007, HFIR completed the most dramatic transformation in its 40-year history. During a shutdown of more than a year, the facility was refurbished and a number of new instruments were installed, as well as a cold neutron source. The reactor was restarted in mid-May; it attained its full power of 85 MW within a couple of days, and experiments resumed within a week. Improvements and upgrades to HFIR include an overhaul of the

357

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

358

Center for the history of chemistry resources  

Science Journals Connector (OSTI)

Center for the history of chemistry resources ... A note alerting those interested in the histories of chemistry, chemical engineering, and chemical process industries to the resources available from the Center for the History of Chemistry. ... Chemical Engineering ...

Bruce V. Lewenstein

1988-01-01T23:59:59.000Z

359

Manhattan Project: Berkeley Meeting  

Office of Scientific and Technical Information (OSTI)

Resources Resources About this Site How to Navigate this Site Library Maps Note on Sources Nuclear Energy and the Public's Right to Know Photo Gallery Site Map Sources and Notes Suggested Readings BERKELEY MEETING University of California, Berkeley (March 29, 1940) Resources > Photo Gallery Lawrence, A. Compton, Bush, Conant, K. Compton, and Loomis A meeting regarding the 184-inch cyclotron project, held at the University of California, Berkeley, on March 29, 1940. Left to right: Ernest O. Lawrence, Arthur H. Compton, Vannevar Bush, James B. Conant, Karl T. Compton, and Alfred L. Loomis. The photograph is reprinted in Richard G. Hewlett and Oscar E. Anderson, Jr., The New World, 1939-1946: Volume I, A History of the United States Atomic Energy Commission (Washington: U.S. Atomic Energy Commission, 1972), opposite page 33.

360

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

362

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

363

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

364

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

365

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

366

Exploration for Geothermal Resources in Dixie Valley, Nevada- Case History  

Open Energy Info (EERE)

in Dixie Valley, Nevada- Case History in Dixie Valley, Nevada- Case History Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Exploration for Geothermal Resources in Dixie Valley, Nevada- Case History Abstract After several years of reconnaissance geology in Nevada, an exploration program to evaluate the geothermal resource potential of Dixie Valley was begun in 1974. Between 1974 and 1978 Sunoco Energy Development Co. conducted two heat-flow drilling programs, a resistivity survey, a seismic emission study, a ground noise survey, two magnetotelluric surveys, a hydrology study, and a surface geology survey. The synthesis of the data resulting from these projects into the regional geologic framework led to the acquisition of geothermal resource leases from fee property owners,

367

Paducah Community Chronicles Site History in New Book | Department of  

Broader source: Energy.gov (indexed) [DOE]

Community Chronicles Site History in New Book Community Chronicles Site History in New Book Paducah Community Chronicles Site History in New Book July 31, 2013 - 12:00pm Addthis Members of the Paducah Citizens Advisory Board helped create the book, The Story of the Paducah Gaseous Diffusion Plant, Megawatts to Megatons to Megawatts. They believe the stories of plant workers are important to preserve for future generations. Members of the Paducah Citizens Advisory Board helped create the book, The Story of the Paducah Gaseous Diffusion Plant, Megawatts to Megatons to Megawatts. They believe the stories of plant workers are important to preserve for future generations. Judy Clayton, project leader and a member of the Paducah Citizen's Advisory Board (CAB), along with the CAB Vice Chair Ben Peterson, present a copy of the book to Cate Alexander (center), Designated Federal Officer of the EM Site-Specific Advisory Board.

368

Client Project Job No Exeter College Ruskin College, Oxford CG/8069  

E-Print Network [OSTI]

through underlying deep gravels causes drop in water level. West East Gravels ­ permeability typically 10eFIGURES #12;Client Project Job No Exeter College Ruskin College, Oxford CG/8069 Title Site location Observational Quarter #12;#12;Client Project Job No Exeter College Ruskin College, Oxford CG/8069 Title

Flynn, E. Victor

369

Hanford Natural Resource Trustee Council History & Accomplishments...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Natural Resource Trustee Council > HNRTC History & Accomplishments About Us Hanford Natural Resource Trustee Council HNRTC Members HNRTC History & Accomplishments Memorandum of...

370

History of Hydropower | Department of Energy  

Energy Savers [EERE]

History of Hydropower History of Hydropower Humans have been harnessing water to perform work for thousands of years. The Greeks used water wheels for grinding wheat into flour...

371

UC land grants: A photo history  

E-Print Network [OSTI]

Berkeley UC land grants: A photo history D Early days: 1862UCR/CMP UC land grants: A photo history H. In 1987, UC

Editors, By

2012-01-01T23:59:59.000Z

372

Annual Energy Outlook with Projections to 2025 - Market Trends- Natural Gas  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Demand and Supply Natural Gas Demand and Supply Annual Energy Outlook 2005 Market Trends - Natural Gas Demand and Supply Figure 82. Natural gas consumption by sector, 1990-2025 (trillion cubic feet). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Figure 83. Natural gas production by source, 1990-2025 (trillion cubic feet). Having problems, call our National Energy Information Center at 202-586-8800 for help. Figure data Projected Increases in Natural Gas Use Are Led by Electricity Generators In the AEO2005 reference case, total natural gas consumption increases from 22.0 trillion cubic feet in 2003 to 30.7 trillion cubic feet in 2025. In the electric power sector, natural gas consumption increases from 5.0 trillion cubic feet in 2003 to 9.4 trillion cubic feet in 2025 (Figure 82),

373

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

374

Performance Tuning of GSCRATCH and PROJECT on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GSCRATCH/PROJECT Performance Tuning on Hopper GSCRATCH/PROJECT Performance Tuning on Hopper Hopper:Improving I/O performance to GSCRATCH and PROJECT What are GSCRATCH/PROJECT? GSCRATCH and PROJECT are two file systems at NERSC that one can access on most computational systems. They are both based on the IBM GPFS file system and have multiple racks of dedicated servers and disk arrays. How are GSCRATCH/PROJECT connected to Hopper? As shown in the figure below, GSCRATCH and PROJECT are each connected to several Private NSD Servers (PNSD; for details, please refer to GPFS documentation). These PNSDs are connected to the Cray Data Virtualization Service (DVS) nodes via the InfiniBand fabric. The DVS nodes are connected to the Hopper Gemini interconnect that connects all Hopper nodes. Because GPFS file systems can't be natively mounted on Hopper compute nodes, the

375

DEMO Project Goals | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

DEMO Project Goals | National Nuclear Security Administration DEMO Project Goals | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog DEMO Project Goals Home > About Us > Our Operations > Management and Budget > Human Resources > Pay-banding > DEMO Project Goals DEMO Project Goals The goals of this demonstration project are to Improve hiring by allowing NNSA to compete more effectively for high

376

Project Management and Systems Support | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

377

Project Management and Systems Support | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

378

Demand Response Projects: Technical and Market Demonstrations  

E-Print Network [OSTI]

Demand Response Projects: Technical and Market Demonstrations Philip D. Lusk Deputy Director Energy Analyst #12;PLACE CAPTION HERE. #12;#12;#12;#12;City of Port Angeles Demand Response History energy charges · Demand charges during peak period only ­ Reduced demand charges for demand response

379

SAT-WIND project Final report  

E-Print Network [OSTI]

-2840 ISBN 87-550-3570-1 The SAT-WIND project `Winds from satellites for offshore and coastal wind energy) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas microwave polarimetric 223.3.1 History 3.3.2 Measurement principle 22 223.3.3 WindSat (passive microwave

380

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

RCS1 Sub-station HV Installation completed in April 2011 In defects until April 2012 For more Project Manager: Rob Pask Phase 2a RCS1 Sub-station enclosing works completed in December 2010 Phase 2b when completed will provide a new 11,000 volt electrical substation, switching gear and associated

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ON THE EQUILIBRIUM FIGURE OF CLOSE-IN PLANETS AND SATELLITES  

SciTech Connect (OSTI)

Many exoplanets have been observed close to their parent stars with orbital periods of a few days. As for the major satellites of the Jovian planets, the figure of these planets is expected to be strongly shaped by tidal forces. However, contrary to solar system satellites, exoplanets may present high values for the obliquity and eccentricity due to planetary perturbations, and may also be captured in spin-orbit resonances different from the synchronous one. Here we give a general formulation of the equilibrium figure of those bodies that makes no particular assumption on the spin and/or orbital configurations. The gravity field coefficients computed here are well suited for describing the figure evolution of a body whose spin and orbit undergo substantial variations in time.

Correia, Alexandre C. M. [Departamento de Fisica, I3N, Universidade de Aveiro, Campus de Santiago, 3810-193 Aveiro (Portugal); Rodriguez, Adrian [Insituto de Astronomia, Geofisica e Ciencias Atmosfericas, IAG-USP, Rua do Matao 1226, 05508-090 Sao Paulo (Brazil)

2013-04-20T23:59:59.000Z

382

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

383

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

384

Project 307  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INTEGRATING MONO ETHANOL AMINE (MEA) INTEGRATING MONO ETHANOL AMINE (MEA) REGENERATION WITH CO 2 COMPRESSION AND PEAKING TO REDUCE CO 2 CAPTURE COSTS Background In Phase I, Trimeric Corporation, in collaboration with the University of Texas at Austin, performed engineering and economic analyses necessary to determine the feasibility of novel MEA processing schemes aimed at reducing the cost of CO 2 capture from flue gas. These novel MEA-based CO 2 capture schemes are designed for integration into coal-fired power plants with the aim of reducing costs and improving efficiency. Primary Project Goal The primary goal of this project was to reduce the cost of MEA scrubbing for the recovery of CO 2 from flue gas by improved process integration. CONTACTS Sean I. Plasynski Sequestration Technology Manager

385

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

386

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

387

Project 301  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2006 2006 Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Arun C. Bose Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4467 arun.bose@netl.doe.gov ADVANCED, LOW/ZERO EMISSION BOILER DESIGN AND OPERATION Background Over the past years, environmental concerns regarding pollutants have grown dramatically. Current annual greenhouse gas (GHG) emissions are 12% higher than they were in 1992. In addition, carbon dioxide (CO 2 ) emissions are projected to increase by an additional 34% over the next 20 years. About one third of carbon emissions in the

388

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

389

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

390

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

391

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

392

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

393

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

394

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

395

Irene Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Irene Station, African Weather Bureau Irene Station, African Weather Bureau The photos on this site come from the Southern Hemisphere Additional Ozonesondes (SHADOZ) project. Additional photos can be found on the SHADOZ Project Web Site. Photo of the Dobson 89 Instrument The Irene Weather Office Agnes Phahlane sits behind the Dobson and collects Total Ozone Data The lab at the Irene station Cal Archer Prepares an ozonesonde Flight Preparations The balloon is readied The release Back to the SAFARI 2000 Photo Page Index Other Sites: Skukuza, MISR Validation Site | Skukuza, Eddy Covariance Site | C-130 Flight Photos | Sua Pan Site | Irene Weather Station | Fire Studies | Kalahari Transect | Kalahari Transect Sites for Canopy Structure Data | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data

396

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

397

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

398

Project Description  

Broader source: Energy.gov (indexed) [DOE]

Project Description Project Description The Energy Policy Act of 2005 (EPAct 2005), the Energy Independence and Security Act of 2007 (EISA 2007), and Presidential Executive Order 13423 all contain requirements for Federal facilities to decrease energy consumption and increase the use of renewable energy by the year 2015. To provide leadership in meeting these requirements, DOE, in partnership with the General Services Administration (GSA), has installed a rooftop solar electric, or PV, system on the roof of DOE's headquarters in Washington, D.C. The 205 kilowatt (kW) installation is one of the largest of its kind in the Nation's capital. A display in the For- restal building will show the power output of the PV system during the day and the energy produced over

399

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

400

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

402

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

403

FUSRAP Project  

Office of Legacy Management (LM)

Project Project 23b 14501 FUSRAP TECHNICAL BULLETIN N O . - R 3 v . L DATE: 1.2 9-99 SUBJECT : Pr.pec.d BY T r m L u d Approval Summary of the results for the Springdale characterization activities performed per WI-94-015, Rev. 0. TUO separate radiological characterization surveys and a limited cherical characterization survey were performed on the Springdale Site in Octcjer and December, 1993. The design of the radiological surveys were to supplement and define existing ORNL surveys. The limited cher.ica1 characterization survey was performed to assist in the completion of waste disposal paperwork. Radiological contamination is primarily ir. the 'belt cutting and belt fabrication'areas of the building with a small erea of contamination in the south end of the building. The chemiccl sac~le

404

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

405

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

406

Form:Marine and Hydrokinetic Technology Project | Open Energy Information  

Open Energy Info (EERE)

Form Form Edit History Facebook icon Twitter icon » Form:Marine and Hydrokinetic Technology Project Jump to: navigation, search Add a Marine and Hydrokinetic Technology Project Input the name of your Marine and Hydrokinetic Technology Project below to add it to the registry. If your project is already in the registry, the form will be populated with that project's fields and you may edit. MHK_Projects/ Submit The text entered into this field will be used as the name of the project being defined. All projects are automatically prefixed with MHK_Projects/. The field is case sensitive so be sure to capitalize in the correct areas and type the full title properly. << Return to the MHK database homepage Retrieved from "http://en.openei.org/w/index.php?title=Form:Marine_and_Hydrokinetic_Technology_Project&oldid=688143"

407

Accelerating projects  

SciTech Connect (OSTI)

This chapter describes work at ORNL in the period around 1950, when the laboratory was evolving from its original mission of research aimed at producing the atomic bomb, to a new mission, which in many ways was unclear. The research division from Y-12 merged with the laboratory, which gave an increased work force, access to a wide array of equipment, and the opportunity to work on a number of projects related to nuclear propulsion. The first major project was for a nuclear aircraft. From work on this program, a good share of the laboratories work in peaceful application of nuclear energy would spring. A major concern was the development of light weight shielding to protect the crew and materials in such a plane. To do such shielding work, the laboratory employed existing, and new reactors. The original plans called for the transfer of reactor work to Argonne, but because of their own research load, and the needs of the lab, new reactor projects were started at the lab. They included the Low Intensity Test Reactor, the Swimming Pool Reactor, the Bulk Shielding Reactor, the Tower Shielding Facility, and others. The laboratory was able to extend early work on calutrons to accelerator development, pursuing both electrostatic accelerators and cyclotrons. The aircraft project also drove the need for immense quantities of scientific data, with rapid analysis, which resulted the development of divisions aimed at information support and calculational support. The laboratory also expanded its work in the effects of radiation and cells and biological systems, as well as in health physics.

Not Available

1992-01-01T23:59:59.000Z

408

Bartlesville History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bartlesville History Bartlesville History Bartlesville History The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. Origins of the U.S. Government's First Petroleum Research Laboratory By 1916 the Bureau of Mines, which had been established six years earlier in the U.S. Department of the Interior, recognized the transforming role that petroleum was playing in American society. Across the country, the Bureau had begun establishing experiment stations, each specializing in a different extraction industry - coal, metals, clay, and other minerals - and each located close to the major centers of each resource. Now, the Bureau announced its intent to establish a petroleum experiment station

409

APS USER TRAINING HISTORY Background  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

USER TRAINING HISTORY USER TRAINING HISTORY Background The User Program Division Director has delegated to the CATs the authority to authorize the conduct of experiments because the CATs have accepted responsibility for: * identifying and evaluating the hazards posed by the experiment, * specifying controls appropriate to the hazards, and * verifying that controls are in place. One form of hazard control frequently made mandatory by law and laboratory policy is worker knowledge. The accepted means of verifying that a worker has the required knowledge is ensuring that the worker has completed appropriate training. With CAT input, the APS has developed the APS User Training History. This web-based tool enables designated CAT personnel to examine data characterizing ES&H training courses

410

FTCP History | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

History History FTCP History In 1993, the Board issued Recommendation 93-3, Improving DOE Technical Capability in Defense Nuclear Facilities. This recommendation resulted in DOE's establishing the Federal Technical Capability Panel (FTCP) and developing two noteworthy standards: DOE M 426.1-1, Federal Technical Capability Manual, and DOE G 426.1-1, Recruiting, Hiring, and Retaining High Quality Technical Staff: A Manager's Guide to Administrative Flexibilities. These standards provide techniques and processes for improving the recruitment, retention, training, and qualification of high-quality personnel. Board Recommendation 93-3 was issued on June 1, 1993, and accepted by the Department of Energy on July 23, 1993. The Recommendation discussed the need to improve the technical capability of federal employees associated

411

Our History | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project's existing physics program. Nobel Physicist Enrico Fermi was sure a self-sustaining chain reaction could be triggered by bombarding the uranium nucleus with thermal...

412

History | Princeton Plasma Physics Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under the code name Project Matterhorn. Lyman Spitzer, Jr., Professor of Astronomy at Princeton University, had for many years been involved in the study of very hot rarefied...

413

NICMOS HISTORY DATABASE AND April 10, 1998  

E-Print Network [OSTI]

1 NICMOS HISTORY DATABASE AND WEB TOOLS C. Tullos April 10, 1998 ABSTRACT The history of NICMOS. The Database and Data A convenient way of keeping a history of some of the NICMOS instrument parameters parameters apply. Instrument Science Report OSG-CAL 98-01 #12;2 NICMOS HISTORY DATABASE LAYOUT 2. The Web

Sirianni, Marco

414

Laboratory automation-A case history  

Science Journals Connector (OSTI)

Laboratory automation-A case history ... This article describes an automated Raman spectrometer. ...

Bernard J. Bulkin; Edward H. Cole; Arthur Noguerola

1974-01-01T23:59:59.000Z

415

UCD School of History & Archives Student Handbook  

E-Print Network [OSTI]

UCD School of History & Archives Student Handbook 2013-2014 This handbook is relevant for all of History and Archives UCD: Student Handbook, 2013-2014 2 Table of Contents 1: Introduction and welcome from Evening Arts students study history? How does the School of history and Archives communicate with its

416

History of 100-B Area  

SciTech Connect (OSTI)

The initial three production reactors and their support facilities were designated as the 100-B, 100-D, and 100-F areas. In subsequent years, six additional plutonium-producing reactors were constructed and operated at the Hanford Site. Among them was one dual-purpose reactor (100-N) designed to supply steam for the production of electricity as a by-product. Figure 1 pinpoints the location of each of the nine Hanford Site reactors along the Columbia River. This report documents a brief description of the 105-B reactor, support facilities, and significant events that are considered to be of historical interest. 21 figs.

Wahlen, R.K.

1989-10-01T23:59:59.000Z

417

Science and Technology Roadmapping to Support Project Planning  

SciTech Connect (OSTI)

Disciplined science and technology roadmapping provides a framework to coordinate research and development activities with project objectives. This case-history paper describes initial project technology needs identification, assessment and R&D ranking activities supporting characterization of 781 waste tanks requiring a 'hazardous waste determination' or 'verification of empty' decision to meet an Idaho state Voluntary Consent Order.

Mc Carthy, Jeremiah Justin; Haley, Daniel Joseph; Dixon, Brent Wayne

2001-07-01T23:59:59.000Z

418

The Mathematics Education into the 21st Century Project  

E-Print Network [OSTI]

The Mathematics Education into the 21st Century Project Proceedings ooff tthhee information on the statistical software available at the faculty, use of computer rooms, degree projects in the history but also in the teaching organization and methods, in procedures used to assess the knowledge

Spagnolo, Filippo

419

ANU Service Desk project communication overview Further information  

E-Print Network [OSTI]

, ANU Research Information Enterprise System (ARIES) and the Researchers database. If you require help users in order to maintain visibility. Job history is also being added to display closed/ processed jobs, and a configuration management database. Communication channels (at varying times throughout project): > Project

420

Research Projects | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Projects Basic Energy Science Projects AA (Fossil Energy) Projects EERE-VT Projects EERE-ED Projects ARPA-E Projects...

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Cape Wind Energy Project A-252 December  

Broader source: Energy.gov (indexed) [DOE]

Wind Energy Project A-252 December 2008 Final EIS Appendix A Figures, Maps and Tables U.S. Department of the Interior Minerals Management Service MMS Table 1.2-1 List of Required Permits and Approvals for the Project Agency Jurisdiction Permit Description ID Number Date Applied Date Approved FEDERAL Department of Interior - Minerals Management Service Outer Continental Shelf Lease, Easement or Right-of-way Under Sec. 8 of the OCS Lands Act 9/14/05 USACE Draft Environmental Impact Statement November 2004 MMS Draft Environmental Impact Statement January 2008 Final Environmental Impact Statement To be filed Council on Environmental Quality, National Environmental Policy Act (NEPA) NEPA jurisdiction is over the entire project Record of Decision

422

Wind Project Siting Tools | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wind Project Siting Tools Jump to: navigation, search Photo from Alstom 2010, NREL 18207 The following tools are helpful for anyone planning a wind project. Resources Cadmus Group. (2012). Distributed Wind Site Analysis Tool. Accessed March 29, 2013. The Distributed Wind Site Analysis Tool is an online tool for conducting detailed site assessments for single-turbine projects, from residential to community scale. Eastern Interconnection States' Planning Council. (2013). EISPC EZ Mapping Tool. Accessed August 13, 2013. This free online mapping tool helps to identify potential clean energy

423

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

424

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

425

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

426

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

427

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

428

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

429

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

430

The Manhattan Project -- Its Story  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project -- Its Story Project -- Its Story Establishment · Operations · Immediate Influences · Long-term Influences · Other Info More About the Manhattan Project atom image Courtesy Argonne National Laboratory The Manhattan Project -- Its Background This year is the 70th anniversary of the establishment of the Manhattan Project, a predecessor of the U.S. Department of Energy. To honor its impacts on science and history, various aspects of its background, establishment, operations, and immediate and long-term influences will be revisited. It started during the fall of 1939, when President F. D. Roosevelt was made aware of the possibility that German scientists were racing to build an atomic bomb and was warned that Hitler would be more than willing to resort to such a weapon. As a result, Roosevelt set up the Advisory Committee on Uranium, consisting of both civilian and military representatives, to study the current state of research on uranium and to recommend an appropriate role for the federal government. The result was limited military funding for isotope separation and the work on chain reactions by Enrico Fermi and Leo Szilard at Columbia University.

431

Supplemental Figures Supplemental Figure1  

E-Print Network [OSTI]

) induced a gradual change in firing patterns, eventually leading to self-sustained tonic discharges (the

Fujisawa, Shigeyoshi

432

History and philosophy of psychology  

Science Journals Connector (OSTI)

... not a rehash job, for it covers many topics in the history and philosophy of psychology of which most self-respecting Anglo-Saxon psychologists are entirely innocent. This is not ... , know what is meant by phenomenology, and understand the strengths and weaknesses of Gestalt psychology. All in all, Thines' choice of topics is excellent and their range impressive. ...

William Barnes-Gutteridge

1978-03-16T23:59:59.000Z

433

HISTORY OF PSYCHOLOGY Psychology 805  

E-Print Network [OSTI]

1 HISTORY OF PSYCHOLOGY Psychology 805 Department of Psychology Michigan State University Spring, 2011 Class meeting times: Tuesday, Thursday, 12:40-2:30 p.m. Place: 119 Psychology Building Instructor: L.J. Harris Office: 217 Psychology Building Office Hours: Mondays, 3:00 - 5 p.m.; other times

Liu, Taosheng

434

HISTORY OF PSYCHOLOGY Psychology 805  

E-Print Network [OSTI]

1 HISTORY OF PSYCHOLOGY Psychology 805 Department of Psychology Michigan State University Fall, 2012 Class meeting times: Tuesday, Thursday, 12:40-2:30 p.m. Place: 120 Psychology Building Instructor: L.J. Harris Office: 217 Psychology Building Office Hours: Mondays, 3:00 - 5 p.m.; other times

Liu, Taosheng

435

History of federal transportation policy  

E-Print Network [OSTI]

History of federal transportation policy TTP 220 S. Handy 4/7/14 #12;Federal Transportation Policy · Rise of road building (1910s +) · Rise of mandated planning (1960s +) · Rise of transit funding (1960s for road building support from the start! · Cars seen as way to decentralize, to get people away from ills

Handy, Susan L.

436

Invited paper History of Semiconductors  

E-Print Network [OSTI]

AbstractThe history of semiconductors is presented beginning with the first documented observation of a semiconductor effect (Faraday), through the development of the first devices (point-contact rectifiers and transistors, early field-effect transistors) and the theory of semiconductors up to the contemporary devices (SOI and multigate devices). Keywordsband theory, laser, Moores law, semiconductor, transistor.

Lidia ?ukasiak; Andrzej Jakubowski

437

Economic History Revisited: New Uncertainties  

E-Print Network [OSTI]

to the southern and midwestern regions of the United States. However, the large run-up in oil prices is increasingEconomic History Revisited: New Uncertainties I n the last Sitar-Rutgers Regional Report, we are paying ever-increasing prices for fewer available sites. Warehouse sites in the southern portion

438

Figure 1. Schematic of initial air pump design Design of Air Pump System Using Bond Graph  

E-Print Network [OSTI]

, is presented in Figure 1. It is a vibratory pump in which an electromagnetic circuit drives a small permanent magnet attached to a pivoted lever that, in turn, drives a rubber bellows pump. The bellows pump has of the cascaded arrangement of three coupled subsystems: the electromagnetic actuator, the lever, and the air

Fernandez, Thomas

439

Figure 1: ATA 42 antenna array at Hat Creek ********ADAPTIVE REAL TIME IMAGING FOR RADIO ASTRONOMY*******  

E-Print Network [OSTI]

Figure 1: ATA 42 antenna array at Hat Creek ********ADAPTIVE REAL TIME IMAGING FOR RADIO ASTRONOMY --------------------------­ · Astronomers primarily interested in astronomy. ­ Data reduction preoccupies radio astronomy specialists,f,p Bandpass( )f PolCal( )f,p Gains( )s,f,p S Beam Imager Astronomy Solver I2 ( ) )^(^, 2sVpfV - å ¹kj X Solver

Militzer, Burkhard

440

Figure 1: Multiplex logarithmic microfluidic perfusion array for probing shear stress effects on stem cells. (A)  

E-Print Network [OSTI]

Figure 1: Multiplex logarithmic microfluidic perfusion array for probing shear stress effects on stem cells. (A) Microfluidic perfusion systems exhibit more defined shear stress profiles and consume. (B) A 1x6 multiplex logarithmic microfluidic array for simultaneous application of shear stress

Voldman, Joel

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Magnetic Levitation System The following figure shows the cross section of a magnetic levitation (MAGLEV) train.  

E-Print Network [OSTI]

Magnetic Levitation System The following figure shows the cross section of a magnetic levitation in matched pairs. The magnetic attraction of the vertically paired magnets balances the force of gravity and levitates the vehicle above the guideway. d h z Train Track Magnets Fixed Reference Line Magnets

Hagan, Martin

442

High figure-of-merit nematic mixtures based on totally unsaturated isothiocyanate liquid crystals  

E-Print Network [OSTI]

. 1. Introduction The continuous demand for faster electro-optic response times is the driving force of figure-of-merit were observed at room temperature for the formulated nematic mixtures. Potential phased arrays (OPAs) for laser communications, require faster response times. In order to achieve a fast

Wu, Shin-Tson

443

* All figures are in color on the Coastal Sediments Proceedings DVD. NONUNIFORM SEDIMENT TRANSPORT MODELING AT  

E-Print Network [OSTI]

1783 * All figures are in color on the Coastal Sediments Proceedings DVD. NONUNIFORM SEDIMENT@ncche.olemiss.edu. Abstract: A depth-averaged two-dimensionalnonuniform sediment transport model is applied to the beaches. The sediment transport, bed change and sorting equations are solved simultaneously and implicitly at the same

US Army Corps of Engineers

444

3-19 Urban Design Figure 3-9 Aerial View E Looking West  

E-Print Network [OSTI]

View F Looking North West #12;3-21 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway to careful site planning and transportation demand management. As the area has become more densely developed employed by TranSComm whose primary responsibilities include identifying and responding to transportation

Mohanty, Raj

445

Figure 1: Swimmer in swimming User Experiences with a Virtual Swimming Interface  

E-Print Network [OSTI]

accomplished the artistic endeavour by swimming in the pool of the ocean liner, Queen Elizabeth II, travelingFigure 1: Swimmer in swimming apparatus. User Experiences with a Virtual Swimming Interface Exhibit@ece.ubc.ca Abstract. We created an exhibit based on a new locomotion interface for swimming in a virtual reality ocean

British Columbia, University of

446

Enhancement of thermoelectric figure-of-merit by resonant states of aluminium doping in lead selenide  

E-Print Network [OSTI]

By adding aluminium (Al) into lead selenide (PbSe), we successfully prepared n-type PbSe thermoelectric materials with a figure-of-merit (ZT) of 1.3 at 850 K. Such a high ZT is achieved by a combination of high Seebeck ...

Zhang, Qinyong

447

Figure 1. Recurrent modular network architecture Recurrent modular network architecture for sea ice  

E-Print Network [OSTI]

). Classification of sea ice in MIZ is important for navigation in these regions and for accurate evaluation of heatFigure 1. Recurrent modular network architecture Recurrent modular network architecture for sea ice classification in the Marginal Ice Zone using ERS SAR images Andrey V. Bogdanov1a , Marc Toussaint1b , Stein

Toussaint, Marc

448

SPACESHUTTLEPROGRAMPETITIONFOR HCFC 141b Exemption Allowance Figure 3.2 Cornpleteil ET in Sliruy Cell  

E-Print Network [OSTI]

OF HCFC 141b BLOWN FOAM Orbiter uses HCFC 141b blown foam to thermally insulate the Main Propulsion System location, necessitating the use of HCFC I-llb blown foam insulation Figures 3 4 and 3.5, respectively. illustrate the umbilical without and with foam insulation 17 #12;SPACESHUTTLEPROGRAMPETITION FOR HCFC 141b

Christian, Eric

449

IN PRINT (Feb. 2012): Am J Psych Word length: 3,983 Tables: 2, Figures: 4  

E-Print Network [OSTI]

in individuals with autism as early as two years of age. Studies using head circumference suggest that brainIN PRINT (Feb. 2012): Am J Psych Word length: 3,983 Tables: 2, Figures: 4 Brain Volume Findings Neurological Institute, McGill University *IBIS Network: The IBIS (Infant Brain Imaging Study) Network

Utah, University of

450

Figure 1. Bipartite network showing how candidate SNPs co-occur across Colombian  

E-Print Network [OSTI]

Figure 1. Bipartite network showing how candidate SNPs co-occur across Colombian patients with one Study of Chronic Metabolic Diseases in Colombians Maria A. Caro MSc1,2 , Bryant Dang BS1 , Gabriel, are associated with key demographic and clinical variables in Colombians with metabolic disease. The results

Bhavnani, Suresh K.

451

NANOTECHNOLOGY 4 NOVEMBER 2004 Figure 1. A `quasi-optical' electron paramagnetic resonance (EPR)  

E-Print Network [OSTI]

NANOTECHNOLOGY 4 NOVEMBER 2004 Figure 1. A `quasi-optical' electron paramagnetic resonance (EPR) spectrometer. EPR: Progress towards spin-based quantum computing Electron- and/or nuclear-spin-based quantum-dependent recombination (SDR)1-4 is an electron paramagnetic resonance (EPR) technique that is potentially useful in spin

Demirel, Melik C.

452

Figure 1. Nicaragua at night. The circled area is the Bluefields region.  

E-Print Network [OSTI]

. Instead, they advocate a focus on rural electrification for this region3 . blueEnergy blueEnergy%3 . The electrification rate in rural areas of Nicaragua, where 45% of the population lives, is a meager 25% 2 (Figure 1 are connected to an electric grid, rural areas outside of these cities are not. Due to geographic barriers

Kammen, Daniel M.

453

US Energy Service Company Industry: History and Business Models  

Office of Energy Efficiency and Renewable Energy (EERE)

Information about the history of US Energy Service Company including industry history, setbacks, and lessons learned.

454

Earth Repair: A Transatlantic History of Environmental Restoration  

E-Print Network [OSTI]

Earth Repair: A Transatlantic History of EnvironmentalHall. Earth Repair: A Transatlantic History of Environmental

Hamilton-Smith, Elery

2006-01-01T23:59:59.000Z

455

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

456

Project Rulison  

Office of Legacy Management (LM)

Rulison Rulison 1970 Environmerstal Surveillance Summary Report J - - Colorado Department of Health DIVISION OF OCCUPATIONAL AND RADIOLOGICAL HEALTH DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. STATE OF COLORADO P R O J E C T R U L I S O N Environments 1 S u r v e i l l a n c e Summary R e p o r t C o l o r a d o D e p a r t m e n t o f H e a l t h D i v i s i o n o f O c c u p a t i o n a l and R a d i o l o g i c a l 3 e a l t h This page intentionally left blank FOREWORD Project Rulison is an experimental Plowshare project undertaken cooperatively by the Atomic Energy Commission (AEC) and the Department of Interior for the government, and Austral Oil Company and CER Geo- nuclear Corporation for private industry. As required by law, the AEC

457

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network [OSTI]

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

458

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

459

Richland Environmental Restoration Project management action process document  

SciTech Connect (OSTI)

This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

NONE

1996-04-01T23:59:59.000Z

460

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The target chamber under construction. Holes in the target chamber provide access for the laser beams and viewing ports for NIF diagnostic equipment. Photo Number: NIF-1209-18056...

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 31 | Next | Last Back to Index Target Bay Foundation One unique challenge was creating the foundation for the NIF target bay, which is about 15 meters below ground level....

462

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 31 | Next | Last Back to Index NIF Groundbreaking Lawrence Livermore National Laboratory Director Bruce Tarter, Secretary of Energy Federico Pena, and Congresswoman Ellen...

463

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The U.S. Department of Energy (DOE) has provided radioisotope thermoelectric generators for space applications since 1961. These generators provide electrical power for spacecraft...

464

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

equipment. The chamber, a sphere ten meters (33 feet) in diameter, is covered with boron-injected concrete to absorb neutrons during NIF experiments. Photo Number: NIF-1209-18055...

465

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 31 | Next | Last Back to Index NIF at Night Crews often worked around the clock to build the stadium-size facility. Construction required more than 4,600 metric tons of...

466

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 31 | Next | Last Back to Index Nova Target Chamber In 1986, Nova produced the largest laser fusion yield to date - a record 11 trillion fusion neutrons. The following year,...

467

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Index Switchyard Construction The switchyards' support structures are built to resist vibration. They are firmly anchored to the building's reinforced concrete walls, which are 0.6...

468

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

convert infrared light to ultraviolet. Nova experiments provided confidence that a NIF-size laser could achieve thermonuclear ignition in a laboratory. Photo Number: NIF-1109-17878...

469

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 31 | Next | Last Back to Index The Final "Golden Bolt" NIF and Photon Science Principal Associate Director Ed Moses honors a NIF contract worker by presenting him with the...

470

Project 371  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brent Marquis Brent Marquis Project Manager Sensor Research and Development 17 Godfrey Dr. Orono, ME. 04473 207-866-0100 ext. 241 SEMI-CONDUCTOR METAL OXIDE TECHNOLOGY FOR IN SITU DETECTION OF COAL-FIRED COMBUSTION GASES Description Sensor Research and Development Corporation is developing a robust prototype sensor system for in situ, real-time detection, identification, and measurement of coal-fired combustion gases. The sensor system is comprised of several unique semi-conducting metal oxide (SMO) sensor arrays in tandem with novel gas prefiltration techniques. The sensor array will be able to selectively detect and measure nitric oxide (NO), nitrogen dioxide (NO 2 ), sulfur dioxide (SO 2 ), carbon dioxide (CO 2 ), carbon monoxide (CO), and ammonia (NH 3 ). The SMO sensor array is the heart of the combustion gas analyzer being developed

471

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

472

Project 298  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reaction Engineering Reaction Engineering International Salt Lake City, UT www.reaction-eng.com CONTACTS Bruce W. Lani Project Manager National Energy Technology Laboratory 412-386-5819 bruce.lani@netl.doe.gov Thomas J. Feeley, III Technology Manager National Energy Technology Laboratory 412-386-6134 thomas.feeley@netl.doe.gov Michael Bockelie Reaction Engineering International 801-364-69255 bockelie@reaction-eng.com WEBSITE http://www.netl.doe.gov NO X CONTROL OPTIONS AND INTEGRATION FOR U.S. COAL FIRED BOILERS (RICH REAGENT INJECTION) Background Enacted regulations pertaining to the NO X SIP Call and potential future regulations in proposed legislation such as the President's Clear Skies Act or EPA's Clean Air Interstate Rule require power producers to seek the most cost effective methods to achieve compliance. In order to address present and

473

Project 398  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Ronald Breault Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4486 ronald.breault@netl.doe.gov Michael Swanson Principal Investigator University of North Dakota Energy and Environmental Research Center 15 North 23rd Street P.O. Box 9018 Grand Forks, ND 58202 701-777-5239 mswanson@eerc.und.nodak.edu ADVANCED HIGH TEMPERATURE, HIGH-PRESSURE TRANSPORT REACTOR Description Today, coal supplies over 55 percent of the electricity consumed in the United States and will continue to do so well into the next century. One of the technologies being

474

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

475

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

476

Project 339  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Combustion Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 jenny.tennant@netl.doe.gov Dr. Tomasz Wiltowski Southern Illinios University Dept. of Mechanical Engineering & Energy Processes Carbondale, IL 62901-4709 618-536-5521 tomek@siu.edu QUALIFICATIONS OF CANDLE FILTERS FOR COMBINED CYCLE COMBUSTION APPLICATIONS Background In order to make oxygen-fired combined cycle combustion feasible, it is necessary to have a reliable high temperature particulate cleanup system. It is well established

477

Project 350  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gas Hydrates Gas Hydrates CONTACTS Ray Boswell Acting Technology Manager Gas Technology Management Division 304-285-4541 ray.boswell@netl.doe.gov James Ammer Director Gas Technology Management Division 304-285-4383 james.ammer@netl.doe.gov Kelly Rose Project Manager Gas Technology Management Division 304-285-4157 kelly.rose@netl.doe.gov Joseph Wilder Research Group Leader Simulation, Analysis and Computational Science Division 304-285-0989 joseph.wilder@netl.doe.gov NETL - DIRECTING THE DEVELOPMENT OF WORLD-CLASS GAS HYDRATE RESERVOIR SIMULATORS Development of reliable simulators that accurately predict the behavior methane hydrates in nature is a critical component of NETL's program to appraise the gas supply potential of hydrates. NETL is leading the development of a suite of modeling tools that are providing

478

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

479

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer CCS Public Outreach: Pathway to Tradable CCS Securities DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. One Broadway, 14 th Floor Cambridge, MA 02142 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 All RIGHTS RESERVED © Benefits: Public Outreach CCS-MVA LINKED TRADABLE SECURITY Increase Public Confidence in CCS Increase Public involvement in CCS "Leakage Rate" Product Distinct from GHG "Credits"

480

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

Note: This page contains sample records for the topic "history projections figure" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project 370  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

crshadd@sandia.gov crshadd@sandia.gov O 2 /CO 2 RECYCLE COAL COMBUSTION TO MINIMIZE POLLUTANTS Description O 2 /CO 2 recycle coal combustion is a promising, retrofittable technique for electric power production, while producing a nearly pure stream of CO 2 for subsequent use or sequestration. Most pollutant emissions, including NO x , are lower in this process, compared to conventional pulverized coal combustion. However, laboratory and pilot-scale tests to date have shown a wide variation in the fractional reduction of NO x when adopting this technology, suggesting that further improvements in NO x reduction are possible, given a better understanding of the dominant routes of NO x production and destruction in these systems. Goals The goal of this project is to determine the relative influence of three different

482

Project 346  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sara Pletcher Sara Pletcher Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-385-4236 sara.pletcher@netl.doe.gov Gary M. Blythe URS Corporation PO Box 201088 Austin, TX 78720 512-419-5321 gary_blythe@urscorp.com BENCH SCALE KINETICS OF MERCURY REACTIONS IN FGD LIQUORS Background When research into the measurement and control of Hg emissions from coal-fired power plants began in earnest in the early 1990s, it was observed that oxidized mercury can be scrubbed at high efficiency in wet FGD systems, while elemental mercury cannot. In many cases, elemental mercury concentrations were observed to increase slightly across wet FGD systems, but this was typically regarded as within the variability of the measurement methods. However, later measurements have

483

Project 261  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOVEL CORROSION SENSOR FOR ADVANCED NOVEL CORROSION SENSOR FOR ADVANCED FOSSIL ENERGY POWER SYSTEMS Description The overall objective of this proposed project is to develop a new technology for on-line corrosion monitoring based on an innovative concept. The specific objectives and corresponding tasks are (1) develop the sensor and electronic measurement system; (2) evaluate and improve the system in a laboratory muffle furnace; and (3) evaluate and improve the system through tests conducted in a pilot-scale coal combustor (~1 MW). Fireside corrosion refers to the metal loss caused by chemical reactions on surfaces exposed to the combustion environment. Such corrosion is the leading mechanism for boiler tube failures and is a serious concern for current and future energy plants due to the introduction of technologies targeting emissions

484

Project 278  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Karen Cohen Karen Cohen Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6667 karen.cohen@netl.doe.gov Ken Nemeth Executive Director Southern States Energy Board 6325 Amherst Court Norcross, GA 30092 770-242-7712 nemeth@sseb.org Sequestration SOUTHEAST REGIONAL CARBON SEQUESTRATION PARTNERSHIP (SECARB) Background The U.S. Department of Energy has selected the seven partnerships of state agencies, universities, and private companies that will form the core of a nationwide network that will help determine the best approaches for capturing and permanently storing gases that can contribute to global climate change. All together, the partnerships include more than 240 organizations, spanning 40 states, three Indian nations, and

485

FLUXNET Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Validation > FLUXNET Validation > FLUXNET The FLUXNET Project Overview [FLUXNET Logo] FLUXNET is a global network of micrometeorological tower sites that use eddy covariance methods to measure the exchanges of carbon dioxide, water vapor, and energy between terrestrial ecosystems and the atmosphere. More that 500 tower sites from about 30 regional networks across five continents are currently operating on a long-term basis. The overarching goal of FLUXNET is to provide information for validating remote sensing products for net primary productivity (npp), evaporation, and energy absorption. FLUXNET provides information to FLUXNET investigators and to the public. The primary functions of FLUXNET are: To provide information about tower location, site characteristics, data availability, and where to obtain the data

486

Project 296  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

McDermott Technology McDermott Technology Alliance, OH www.mcdermott.com CONTACTS Bruce W. Lani Project Manager National Energy Technology Laboratory 412-386-5819 bruce.lani@netl.doe.gov Thomas J. Feeley, III Technology Manager National Energy Technology Laboratory 412-386-6134 thomas.feeley@netl.doe.gov Hamid Farzan Babcock & Wilcox Company 330-860-6628 HFarzan@babcock.com WEBSITE http://www.netl.doe.gov NO X CONTROL FOR UTILITY BOILER OTR COMPLIANCE Background Enacted regulations pertaining to the NO X SIP Call and potential future regulations in proposed legislation such as the President's Clear Skies Act or EPA's Clean Air Interstate Rule require power producers to seek the most cost effective methods to achieve compliance. In order to address present and anticipated NO X emissions control legislation targeting the current fleet of U.S. coal-fired boilers, the Department

487

Project 253  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Anna Lee Tonkovich Anna Lee Tonkovich Technical Contact Velocys, Inc. 7950 Corporate Blvd. Plain City, OH 43064 614-733-3330 tonkovich@velocys.com Sequestration UPGRADING METHANE STREAMS WITH ULTRA-FAST TSA Background Most natural gas streams are contaminated with other materials, such as hydrogen sulfide (H 2 S), carbon dioxide (CO 2 ), and nitrogen. Effective processes for removal of H 2 S and CO 2 exist, but because of its relative inertness, nitrogen removal is more difficult and expensive. This project will focus on the separation of nitrogen from methane, which is one of the most significant challenges in recovering low-purity methane streams. The approach is based on applying Velocys' modular microchannel process technology (MPT) to achieve ultra-fast thermal swing adsorption (TSA). MPT

488

Project 397  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Gasification Technologies CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov John Stipanovich Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6027 john.stipanovich@netl.doe.gov Derek Aldred Principal Investigator Stamet, Inc. 8210 Lankershim Blvd. #9 North Hollywood, CA 91605 818-768-1025 dlaldred@stametinc.com CONTINUOUS PRESSURE INJECTION OF SOLID FUELS INTO ADVANCED COMBUSTION SYSTEM PRESSURES Description Operators and designers of high-pressure combustion systems universally agree that one of the major problems inhibiting the success of this technology relates to solid

489

Project 303  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CONCEPTUAL DESIGN OF OXYGEN-BASED CONCEPTUAL DESIGN OF OXYGEN-BASED PC BOILER Background Because of growing concern that a link exists between global climatic change and emission of greenhouse gases, such as CO 2 , it is prudent to develop new coal combustion technologies to meet future emissions standards, should it become necessary to limit CO 2 emissions to the atmosphere. New technology is needed to ensure that the U.S. can continue to generate power from its abundant domestic coal resources. This project will design an optimized combustion furnace to produce a low-cost, high-efficiency power plant that supports the U.S. Department of Energy's (DOE) goal of developing advanced combustion systems that have the potential to control CO 2 through an integrated power system that produces a concentrated

490

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

491

Project 143  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

George Rizeq George Rizeq Principal Investigator GE Global Research 18A Mason Irvine, CA 92618 949-330-8973 rizeq@research.ge.com FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF HYDROGEN AND SEQUESTRATION-READY CARBON DIOXIDE Description Projections of increased demands for energy worldwide, coupled with increasing environmental concerns have given rise to the need for new and innovative technologies for coal-based energy plants. Incremental improvements in existing plants will likely fall short of meeting future capacity and environmental needs economically. Thus, the implementation of new technologies at large scale is vital. In order to prepare for this inevitable paradigm shift, it is necessary to have viable alternatives that have been proven both theoretically and experimentally

492

Project 270  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SILICON CARBIDE MICRO-DEVICES FOR SILICON CARBIDE MICRO-DEVICES FOR COMBUSTION GAS SENSING UNDER HARSH CONDITIONS Description Reducing pollution and improving energy efficiency require sensitive, rugged sensors that can quantitatively detect gases that are produced in advanced combustion systems. Most materials cannot withstand the high temperature, chemically reactive environments encountered in power plants. This project is focused on developing solid state sensors based on the wide bandgap semiconductor silicon carbide (SiC), which can tolerate high temperatures and pressures as well as corrosive gases. Drawing upon the tools of semiconductor physics, surface science and chemistry, at the level of individual atoms and molecules, an understanding of the underlying physical mechanisms leading to

493

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

1 1 July 2011 Doc. No. S07978 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: April 1-June 30, 2011 This report summarizes project status and activities implemented April through June 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental Protection Agency (EPA) National Priorities List (NPL) in 1989 and 1986, respectively. The U.S. Department of Energy (DOE) implemented remedial actions at the MVP in 1986 and at the MMTS in 1989, to conform to requirements of the Comprehensive Environmental Response, Compensation, and Liability

494

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

FFA Quarterly Report: April 1-June 30, 2009 FFA Quarterly Report: April 1-June 30, 2009 July 2009 Doc. No. S05572 Page 1 Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: April 1-June 30, 2009 This report summarizes project status and activities implemented April through June 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) sites. This report also includes disposal cell and Pond 4 leachate collection data, quarterly site inspection reports, site meteorological data, and a performance summary for the ex situ groundwater treatment system. 1.0 MMTS Activities/Status 1.1 Disposal Cell and Pond 4 * Monthly and quarterly inspections of the repository identified livestock damage to a

495

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

31, 2011 31, 2011 April 2011 Doc. No. S07666 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January 1-March 31, 2011 This report summarizes project status and activities implemented January through March 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental Protection Agency (EPA) National Priorities List (NPL) in 1989 and 1986, respectively. The U.S. Department of Energy (DOE) implemented remedial actions at the MVP in 1986 and at the MMTS in 1989, to conform to requirements of the Comprehensive Environmental Response, Compensation, and Liability

496

Project 320  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Philip Goldberg Philip Goldberg Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-5806 philip.goldberg@netl.doe.gov Marek Wojtowicz Advanced Fuel Research, Inc. 87 Church Street East Hartford, CT 06108 860-528-9806 marek@AFRinc.com Sequestration CARBON DIOXIDE RECOVERY FROM COMBUSTION FLUE GAS USING CARBON- SUPPORTED AMINE SORBENTS Background In Phase I, Advanced Fuel Research, Inc. will initiate development of a novel sorbent for the removal of carbon dioxide from combustion/incineration flue gas. The sorbent, based on amines supported on low-cost activated carbon, will be produced from scrap tires. Liquid-based amine systems are limited to relatively low concentrations to avoid corrosion. Corrosion should not be a

497

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

498

Project Status  

Broader source: Energy.gov (indexed) [DOE]

Hybrid Generation Simulator Hybrid Generation Simulator HybSim© 1.0 DAVID TRUJILLO SANDIA NATIONAL LABORATORY Presented by Joshua Bartlett - University of Michigan Introduction * HybSim© 1.0 copyrighted 2006 * First license to University of Michigan Introduction HybSim© Model What - "Hybrid Simulator"; Tool designed to evaluate the economic and environmental benefits of adding renewable energy to the fossil fuel generation mix in remote and difficult-accessible locations. Why - Benefits of energy storage, decision analysis, risk analysis, load growth issues, load management, economic analysis, planning (what-ifs) Who - Availability to coops, field techs, project managers, administrative personnel Where - Remote villages, military installations, remote industrial systems; any climate

499

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

500

Project 328  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 Jenny.Tennant@netl.doe.gov Gasification Technologies Conceptual drawing of Rocketdyne's gasification system ADVANCED GASIFICATION SYSTEMS DEVELOPMENT Description Rocketdyne will apply rocket engine technology to gasifier design, allowing for a paradigm shift in gasifier function, resulting in significant improvements in capital and maintenance costs. Its new gasifier will be an oxygen-blown, dry-feed, plug-flow entrained reactor able to achieve carbon conversions of nearly 100 percent by rapidly heating low coal particles