National Library of Energy BETA

Sample records for history cleanup status

  1. West Valley Site History, Cleanup Status, and Role of the West...

    Office of Environmental Management (EM)

    Site History, Cleanup Status, and Role of the West Valley Citizen Task Force West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force Presentation...

  2. Cleanup Contractor Achieves ‘Elite’ Nuclear Material Accountability Status

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – EM’s cleanup contractor at the Paducah site has received national acclaim for timeliness of reporting and promptness in reconciling nuclear material inventories.

  3. EM's West Valley Cleanup Finds Success in History-Making Waste Relocation

    Office of Environmental Management (EM)

    | Department of Energy Finds Success in History-Making Waste Relocation EM's West Valley Cleanup Finds Success in History-Making Waste Relocation November 10, 2015 - 5:00pm Addthis Workers load an overpack container into a vertical storage cask. Workers load an overpack container into a vertical storage cask. WEST VALLEY, N.Y. - For the first time in U.S. history, high-level waste (HLW) was placed in long-term, outdoor storage. The unprecedented accomplishment occurred in EM's cleanup at the

  4. Waste Cleanup: Status and Implications of Compliance Agreements Between DOE and Its Regulators

    SciTech Connect (OSTI)

    Jones, G. L.; Swick, W. R.; Perry, T. C.; Kintner-Meyer, N.K.; Abraham, C. R.; Pollack, I. M.

    2003-02-26

    This paper discusses compliance agreements that affect the Department of Energy's (DOE) cleanup program. Compliance agreements are legally enforceable documents between DOE and its regulators, specifying cleanup activities and milestones that DOE has agreed to achieve. Over the years, these compliance agreements have been used to implement much of the cleanup activity at DOE sites, which is carried our primarily under two federal laws - the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA) and the Resource Conservation and Recovery Act of 0f 1976, as amended (RCRA). Our objectives were to determine the types of compliance agreements in effect at DOE cleanup sites, DOE's progress in achieving the milestones contained in the agreements, whether the agreements allowed DOE to prioritize work across sites according to relative risk, and possible implications the agreements have on DOE's efforts to improve the cleanup program.

  5. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War

  6. Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Environmental Cleanup Learn more about the history, cleanup activities and possible future uses of the Hanford Site, a 586-square-mile government site in southeast Washington State. | Video courtesy of the Energy Department. The Energy Department is committed to a safe, complete cleanup of the environmental legacy of five decades of government-sponsored nuclear weapons development and nuclear energy research. As part of this mission, we safely and cost-effectively transport

  7. Environmental Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Tour Environmental Cleanup See how LANL is cleaning up the environmental legacy of the Manhattan Project and Cold War Open full screen to view more You are...

  8. West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force

    Broader source: Energy.gov [DOE]

    Presentation made by Raymond C. Vaughan for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. 

  9. HANDBOOK FOR CONDUCTING ORAL HISTORY INTERVIEWS RELATED TO TRIBAL AND INDIAN PARTICIPATION IN THE CONSTRUCTION, OPERATION AND CLEANUP OF THE NUCLEAR WEAPONS COMPLEX

    SciTech Connect (OSTI)

    Cristann Gibson; Mervyn L. Tano; Albert Wing

    1999-08-31

    There were three major projects undertaken at the outset of the DOE/EM 22 Cooperative Agreement back in September 1995. There was a project relating to Tribal oral histories. Another project of the Cooperative Agreement related to technology and Tribal values and needs. This project by analogy could apply to issues of technology, environmental cleanup and other indigenous peoples internationally. How can Indian Tribes participate in defining the need for technology development rather than merely learning to adapt themselves and their situations and values to technology developed by others with differing needs, values and economic resources? And the third project was the placement of a Tribal intern in EM-22.

  10. Cleanup at Rocky Flats

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download February 22, 2016 Cleanup Progress Report - 2015 Oak Ridge's cleanup accomplishments during 2015. January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup

  11. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Feature Stories community-environmentassetsimagesicon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past,...

  12. Recovery Act funds advance cleanup efforts at Cold War site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    historic Technical Area 21. "These buildings served their purpose during a difficult time in American history," said LANL Recovery Act cleanup director Bruce Schappell. "It's...

  13. Moab Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Moab Site Cleanup By the Numbers Moab Site Cleanup By the Numbers Moab Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Moab Site Cleanup By the

  14. Idaho Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Site Cleanup By the Numbers Idaho Site Cleanup By the Numbers Idaho Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Idaho Site Cleanup By the

  15. Paducah Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Site Cleanup By the Numbers Paducah Site Cleanup By the Numbers Paducah Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Paducah Site Cleanup

  16. Hanford Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Site Cleanup By the Numbers Hanford Site Cleanup By the Numbers Hanford Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Hanford Site Cleanup

  17. Accelerating cleanup: Paths to closure

    SciTech Connect (OSTI)

    1998-06-01

    This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

  18. Radiological cleanup of Enewetak Atoll

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    For 8 years, from 1972 until 1980, the United States planned and carried out the radiological cleanup, rehabilitation, and resettlement of Enewetak Atoll in the Marshall Islands. This documentary records, from the perspective of DOD, the background, decisions, actions, and results of this major national and international effort. The documentary is designed: First, to provide a historical document which records with accuracy this major event in the history of Enewetak Atoll, the Marshall Islands, the Trust Territory of the Pacific Islands, Micronesia, the Pacific Basin, and the United States. Second, to provide a definitive record of the radiological contamination of the Atoll. Third, to provide a detailed record of the radiological exposure of the cleanup forces themselves. Fourth, to provide a useful guide for subsequent radiological cleanup efforts elsewhere.

  19. Legacy Cleanup Completion Project

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Christine Gelles, Associate Deputy Assistant Secretary, Waste Management EM HQ.

  20. Environmental Cleanup Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Cleanup Reports Environmental Cleanup Reports June 2, 2015 Audit Report: DOE/IG-0937 The Status of Cleanup at the Department of Energy's Paducah Site September 18, 2014 Audit Report: OAS-M-14-11 Follow-Up on the Management of the Plutonium Finishing Plant Project September 26, 2013 Audit Report: OAS-L-13-15 The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory August 8, 2013 Audit Report: OAS-M-13-03 Cost Transfers at the Department's

  1. Los Alamos National Laboratory Site Cleanup By the Numbers | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Los Alamos National Laboratory Site Cleanup By the Numbers Los Alamos National Laboratory Site Cleanup By the Numbers Status of the Los Alamos Cleanup Activities as of May 2016 PDF icon LANL-Site-By-The-Numbers-May-2016.pdf More Documents & Publications Los Alamos National Laboratory Site Cleanup By the Numbers Los Alamos National Laboratory Site Cleanup By the Numbers Audit Report: IG-0793 CX-010905: Categorical Exclusion Determination

  2. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Beam Status Print Loading... You can also view the Operations Group's Beam History archives.

  3. Environmental Cleanup and Remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup /environment/_assets/images/icon_earthday.jpg Environmental Cleanup: Cleaning the Past Our goal is to clean up legacy waste sites and contaminated areas to protect human health and the environment, now and for years to come. WIPP Accident Investigation Board Report» Feature Stories» What We Clean Up & Why» TOP STORIES - highlights of our science, people, technologies close Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace To reduce its

  4. National Cleanup Workshops

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA), in cooperation with the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG), held the first National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM’s progress in the cleanup of the environmental legacy of the nation’s Manhattan Project and Cold War nuclear weapons program. The workshop focused on major cleanup successes planned for the next two years, contract and project management improvement, efforts to develop new cleanup technologies, and more.

  5. West Valley Demonstration Project Site Cleanup By the Numbers | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy West Valley Demonstration Project Site Cleanup By the Numbers West Valley Demonstration Project Site Cleanup By the Numbers West Valley Demonstration Project Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste

  6. Oak Ridge Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Oak Ridge Site

  7. Portsmouth Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth Site Cleanup By the Numbers Portsmouth Site Cleanup By the Numbers Portsmouth Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download PDF icon Portsmouth

  8. Idaho Site Advances Recovery Act Cleanup after Inventing Effective

    Office of Environmental Management (EM)

    Treatment | Department of Energy Advances Recovery Act Cleanup after Inventing Effective Treatment Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment process. The American Recovery and Reinvestment Act invested $70 million in the project, which employs 130 workers. DOE

  9. Cleanup Progress Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News » Cleanup Progress Reports Cleanup Progress Reports Documents Available for Download February 22, 2016 Cleanup Progress Report - 2015 Oak Ridge's cleanup accomplishments during 2015. January 1, 2015 Cleanup Progress Report - 2014 Oak Ridge's cleanup accomplishments during 2014 January 1, 2014 Cleanup Progress Report - 2013 Oak Ridge's cleanup accomplishments in 2013. January 1, 2013 Cleanup Progress Report - 2012 Oak Ridge's cleanup accomplishments during 2012. January 2, 2012 Cleanup

  10. Chromium Groundwater Cleanup in Mortandad Canyon

    Broader source: Energy.gov [DOE]

    At the September 24, 2014 Board meeting Cheryl Rodriguez DOE and Danny Katzman LANL, Provided Information on the Status of the Characterization of the Chromium Groundwater Plume in Mortandad Canyon. Possible Clean-up Strategies were also covered in the Information Provided.

  11. 2014 Cleanup Progress

    Energy Savers [EERE]

    96 Annual Report to the Oak Ridge Regional Community 2014 Cleanup Progress 2 1 Message from the EM Manager Department of Energy Oak Ridge Office To the Oak Ridge Regional Community: Reflecting on 2014, I am extremely proud of the Department of Energy (DOE) Oak Ridge Office's accomplishments. We completed the Department of Energy's larg- est-ever demolition project, transferred unneeded land to the community to bolster economic development opportunities, and progressed on cleanup projects at the

  12. Environmental Cleanup Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories /environment/_assets/images/icon-environment.jpg Environmental Cleanup Stories Our environmental stewardship commitment: clean up the past, minimize environmental impacts, and create a sustainable future. A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a

  13. Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for contract years 2009, 200S, 2007, 2006, 2005 for the following DOE prime contracts. WTS - WIPP Carlsbad, NM CWI - Idaho Cleanup Project (ICP) WVES - Interim Ends State...

  14. History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Physics Isotopes History History Isotopes produced at Los Alamos National Laboratory are saving lives, advancing cutting-edge research and keeping the U.S. safe....

  15. Cleanup Fact Sheets | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Site Cleanup » Cleanup Fact Sheets Cleanup Fact Sheets Fact Sheets Available for Download East Tennessee Technology Park Cleanup Y-12 National Security Complex Cleanup Oak Ridge National Laboratory Cleanup OREM Accomplishments Timeline Environmental Laws and Regulations Site Cleanup Risk Removal Modernization Reindustrialization Waste Management Program Management Community Engagement

  16. Idaho Cleanup Project Congressional Nuclear Cleanup Caucus

    Energy Savers [EERE]

    Cleanup Program April 30, 2014 Thomas J. Dieter, CH2M-WG Idaho Danny Nichols, Idaho Treatment Group 2 www.energy.gov/EM The Idaho Site Background * 890 Square Miles * Remote location in the southeast region of Idaho * Established in 1949 as the Naval Gunnery Range * Currently referred to as the Idaho National Laboratory * Provided an isolated location where 52 first-of-a-kind test reactors could be designed, built and tested with one still in operation (Advanced Test Reactor) * EM's Idaho

  17. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, D.M.; Taft, W.E.

    1994-12-20

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling. 1 figure.

  18. Reactor water cleanup system

    DOE Patents [OSTI]

    Gluntz, Douglas M.; Taft, William E.

    1994-01-01

    A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.

  19. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. To date, EM has made substantial progress in nearly every area of nuclear waste cleanup and completed cleanup at 91 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive

  20. 2016 National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG).

  1. Cleanup Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sites Cleanup Sites The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. The 33,500-acre Oak Ridge Reservation, outlined in red, contains three primary cleanup areas-- the East Tennessee Technology Park, Oak Ridge National Laboratory, and Y-12 National Security Complex. Oak Ridge has three primary cleanup sites within the Oak Ridge Reservation-the Oak

  2. History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History History Print Photos 20th Anniversary Kickoff Brunch, January 11, 2013 ALS 20th Anniversary Celebration, October 4, 2013 Videos ALS Dedication, October 22, 1993 (excerpts) ALS Dedication, October 22, 1993 (full) The ALS Beamline Clock Articles BRIGHT BEAMS: The Advanced Light Source LBL Research Review (Spring 1993) A history of the ALS, From Cyclotron to Synchrotron Interactive Timeline ALS History: The First 20 Years

  3. Richland Operations Office Cleanup Strategy, Scope

    Energy Savers [EERE]

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  4. Site Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Site Cleanup A view of Building K-25 cleanup at the East Tenneseee Technology Park. A view of Building K-25 cleanup at the East Tenneseee Technology Park. Unlike many EM cleanup sites, Oak Ridge has numerous ongoing missions aside from EM. The success and rate of progress often depends on the amount of work the organization achieves at the site. At the East Tennessee Technology Park, EM is tasked with removing facilities associated with 40 years of uranium enrichment and production to

  5. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Print Loading... You can also view the Operations Group's Beam History archives

  6. History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Print Photos 20th Anniversary Kickoff Brunch, January 11, 2013 ALS 20th Anniversary Celebration, October 4, 2013 Videos ALS Dedication, October 22, 1993 (excerpts) ALS Dedication, October 22, 1993 (full) The ALS Beamline Clock Articles BRIGHT BEAMS: The Advanced Light Source LBL Research Review (Spring 1993) A history of the ALS, From Cyclotron to Synchrotron Interactive Timeline ALS History: The First 20 Years

  7. history

    National Nuclear Security Administration (NNSA)

    several contributions over SRS's history, including large-scale production of aluminum-lithium alloys; production of kilogram quantities of radioactive waste glass; materials...

  8. history

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  9. WIPP Accelerating Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other

  10. he Hanford Story Tank Waste Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    he Hanford Story Tank Waste Cleanup he Hanford Story Tank Waste Cleanup Addthis Description The Hanford Story Tank Waste Cleanup

  11. Key Issues in Syngas Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    normalized absorption (a.u.) James J. Spivey, Louisiana State University, Director www.efrc.lsu.edu Key Issues in Syngas Cleanup Kerry Dooley - Dept. of Chemical Engineering, ...

  12. Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (WIPP) Site Cleanup By the Numbers Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers Waste Isolation Pilot Plant (WIPP) Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an

  13. Los Alamos National Laboratory Site Cleanup By the Numbers | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Laboratory Site Cleanup By the Numbers Los Alamos National Laboratory Site Cleanup By the Numbers Los Alamos National Laboratory Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground

  14. Nevada National Security Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site Cleanup By the Numbers Nevada National Security Site Cleanup By the Numbers Nevada National Security Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository

  15. From Cleanup to Stewardship | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    From Cleanup to Stewardship From Cleanup to Stewardship From Cleanup to Stewardship, a Companion Report to Accelerating Cleanup: Paths to Closure and Background Information Supporting the Scoping Process Required for the 1998 PEIS Settlement Study. Long-term stewardship was expected to be needed at more than 100 DOE sites after EM completed cleanup of the waste and contamination resulting from nuclear research and nuclear weapons production over the past 50 years. From Cleanup to Stewardship

  16. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting Apparatus, systems, and methods for...

  17. Nuclear radiation cleanup and uranium prospecting (Patent) |...

    Office of Scientific and Technical Information (OSTI)

    Nuclear radiation cleanup and uranium prospecting Citation Details In-Document Search Title: Nuclear radiation cleanup and uranium prospecting You are accessing a document from...

  18. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  19. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  20. New Contract Helps Portsmouth GDP Cleanup

    Broader source: Energy.gov [DOE]

    To accelerate the Portsmouth GDP cleanup efforts left over from the Cold War, the Department of Energy made a huge step forward in our nuclear environmental cleanup efforts.

  1. Enewetak fact book (a resume of pre-cleanup information)

    SciTech Connect (OSTI)

    Bliss, W.

    1982-09-01

    The book contains a group of short treatises on the precleanup condition of the islands in Enewetak Atoll. Their purpose was to provide brief guidance to the radiological history and radiological condition of the islands for use in cleanup of the atoll. (ACR)

  2. DOE National Cleanup Workshop 2015

    Broader source: Energy.gov [DOE]

    John Hale III, Director of the Office of Small and Disadvantage Business Utilization (OSDBU) at the Department of Energy, spoke at the 1st Annual DOE National Cleanup Workshop, held in September 2015.

  3. East Tennessee Technology Park Cleanup

    Broader source: Energy.gov [DOE]

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the East Tennessee Technology Park.

  4. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  5. Commercial Environmental Cleanup -- The products and services...

    Office of Scientific and Technical Information (OSTI)

    Commercial Environmental Cleanup -- The products and services directory. Treatment, characterization and extractiondeliverymaterials handling technologies Citation Details ...

  6. Upper Los Alamos Canyon Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory

  7. Paducah Cleanup Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Milestones Paducah Cleanup Milestones The Paducah Site Management Plan sets forth enforceable milestones for cleanup activities. These activities include a series of prioritized cleanup actions, ongoing analysis to support future cleanup decisions, and eventual D&D of the gaseous diffusion plant. FY 2015 - Key Milestones/Outlook Issue Federal Facility Agreement Annual Site Management Plan (D1) Issue Burial Grounds Solid Waste Management Unit 5 and 6 Record of Decision (D1) C-400 -

  8. Savannah River Site Cleanup By the Numbers | Department of Energy

    Office of Environmental Management (EM)

    Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites ...

  9. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  10. Argonne National Lab Cleanup schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule,

  11. CLOSURE OF THE FAST FLUX TEST FACILITY (FFTF) HISTORY & STATUS & FUTURE PLANS

    SciTech Connect (OSTI)

    FARABEE, O.A.

    2006-02-24

    In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.

  12. Stimulus Funding Will Accelerate Cleanup In Idaho

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CLEANUP PROJECT ARRA FACT SHEET 1119 Kb Energy Secretary Chu Announces 6 Billion in Recovery Act Funding for Environmental Cleanup 88 Kb Editorial Date March 31, 2008 By Bradley...

  13. National Cleanup Workshops | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Cleanup Workshops National Cleanup Workshops The Energy Communities Alliance (ECA), in cooperation with the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG), held the first National Cleanup Workshop Sept. 29 and 30, 2015, in the Washington, D.C. area. The workshop brought together senior DOE executives, officials from DOE sites, industry executives, and other stakeholders to discuss EM's progress in the cleanup of the environmental legacy of the nation's

  14. Washington Closure Hanford: Cleanup Progress Along Hanford's...

    Broader source: Energy.gov (indexed) [DOE]

    Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear...

  15. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  16. 2016 National Cleanup Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 National Cleanup Workshop 2016 National Cleanup Workshop 2016 National Cleanup Workshop The Energy Communities Alliance (ECA) will be holding the 2016 National Cleanup Workshop Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. Cooperating organizations for the event include the Department of Energy (DOE) and the Energy Facility Contractors Group (EFCOG). The workshop will bring together senior DOE executives, officials from DOE sites, industry executives, and other

  17. Paducah Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Paducah Cleanup Progress Since 1990, DOE has invested $1.9 billion in successful Paducah site cleanup projects to protect human health and the environment. The Environmental Management (EM) cleanup mission will continue through GDP transition and decontamination and decommissioning. Significant Paducah Site Cleanup Progress since 1990: Paducah leanup Progress graphic Recent Progress A panoramic view of the east end of the C-410 complex shows a rainbow forming as sunlight passes through

  18. 2014 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Congressional Nuclear Cleanup Caucus Briefings 2014 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon FY15 Budget Overview for Cleanup Caucus PDF icon Idaho Cleanup Project PDF icon Advanced Mixed Waste Treatment Project PDF icon Richland Operations Office Cleanup Strategy, Scope PDF icon Idaho Cleanup

  19. EM Tackles Cleanup at Tonopah Test Range | Department of Energy

    Office of Environmental Management (EM)

    Tackles Cleanup at Tonopah Test Range EM Tackles Cleanup at Tonopah Test Range September 30, 2014 - 12:00pm Addthis Field technicians survey a shaker used in past cleanup operations. Field technicians survey a shaker used in past cleanup operations. A field technician in protective gear surveys a bucket used during soil cleanup in 1997. A field technician in protective gear surveys a bucket used during soil cleanup in 1997. Field technicians survey a shaker used in past cleanup operations. A

  20. Legacy Cleanup Contract Awarded | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legacy Cleanup Contract Awarded Legacy Cleanup Contract Awarded September 23, 2015 - 6:00pm Addthis Cincinnati - The U.S. Department of Energy (DOE) today announced the award of a Cost-Plus-Award Fee contract to Los Alamos National Security, LLC (LANS) of Los Alamos, NM. This bridge contract is for the Office of Environmental Management (EM) funded legacy cleanup activities at the Los Alamos National Laboratory (LANL). LANS is formed by the University of California, Bechtel, Babcock & Wilcox

  1. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Hanford Site Cleanup Completion Framework Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email

  2. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  3. The ABCs of Hanford Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ABC's of Hanford Cleanup A B C ARRA Budget Community Relations Plan Asbestos Branching Out Columbia River Workshops Baton Chromium Badgers

  4. Tank Farm Area Cleanup Decision-Making

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area Cleanup Decision-Making Groundwater Vadose Zone Single Shell Tank System Closure (tanks, structures and pipelines) * Washington State Hazardous Waste Management Act (Resource...

  5. Portsmouth Environmental Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    required the use of a number of typical and special industrial chemicals and materials. ... The Environmental Cleanup Program was established by DOE in 1989 to identify, control, and ...

  6. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    waste landfill. "The Recovery Act has been a huge boost to our overall cleanup efforts," said Michael Graham, LANL's associate director of environmental programs. "Completing...

  7. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  8. Cleanup Chief Visits Portsmouth, Paducah Sites

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – EM Assistant Secretary Dr. Monica Regalbuto recently visited EM’s Portsmouth and Paducah sites to review cleanup progress.

  9. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  10. Protocol_for_Environmental_Management_Cleanup_Projects_(clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf PDF icon ProtocolforEnvironmentalManagement...

  11. 2015 DOE National Cleanup Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 DOE National Cleanup Workshop 2015 DOE National Cleanup Workshop Addthis 1 of 5 2 of 5 3 of 5 4 of 5 5 of 5

  12. Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated The Office ...

  13. Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup continues to prepare the remaining part of the complex, backgroundfor demolition ... Cleanup continues to prepare the remaining part of the complex, backgroundfor demolition ...

  14. Lawrence Berkeley National Laboratory Launches Cleanup and Demolition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project June 30, 2015 - 12:00pm ...

  15. Oak Ridge National Laboratory Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Material Downblending and Disposition 4500 Gaseous Waste System Molten Salt Reactor Experiment PDF icon ORNL cleanup fact sheet More Documents & Publications Cleanup Progress ...

  16. Passive Groundwater Cleanup Measures Save Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars November 25, ...

  17. Energy Technology Engineering Center (ETEC) Cleanup By the Numbers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Technology Engineering Center (ETEC) Cleanup By the Numbers Energy Technology Engineering Center (ETEC) Cleanup By the Numbers Energy Technology Engineering Center (ETEC) ...

  18. Technology Development Advances EM Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development Advances EM Cleanup Technology Development Advances EM Cleanup The unique nature of many of EM's remaining facilities will require a strong and responsive engineering ...

  19. Renewable Natural Gas Clean-up Challenges and Applications |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Renewable Natural Gas Clean-up Challenges and Applications Renewable Natural Gas Clean-up Challenges and Applications Blending Hydrogen into Natural ...

  20. Quadrogen Gas Clean-Up Technology for Fuel Cell Applications

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to: Quadrogen Gas Clean-up Technology for Fuel Cell Applications Presented by: Alakh ... Quadrogen Overview Developed proprietary gas clean-up technology for fuel cell ...

  1. EM's Defense Waste Processing Facility Achieves Waste Cleanup...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Waste Processing Facility Achieves Waste Cleanup Milestone EM's Defense Waste Processing Facility Achieves Waste Cleanup Milestone January 14, 2016 - 12:10pm Addthis The ...

  2. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the ...

  3. Hazardous waste cleanup: the preliminaries

    SciTech Connect (OSTI)

    Amos, K.

    1985-08-01

    This article describes the lengthiness and cost of the preliminary steps in a hazardous waste cleanup. The article describes the S-Area lawsuit, an area near Niagara Falls, New York which was an inactive chemical dump. Contaminated sludge was found at a nearby water treatment plant and was traced back to S-Area. In the past five years, S-Area negotiations have cost the U.S. Environmental Protection Agency two million dollars for advice on how work should proceed for the plant and the landfill. This lawsuit was one of the first in the U.S. against a chemical company for endangering the public through unsound waste disposal practices. Negotiation was selected instead of a trial for several reasons which are outlined. S-Area may serve as a model for other such settlements, as it provides for a flexible plan, open to consideration of alternate technologies that may be developed in the future. It contains a phased approach to both defining and evaluating existing problems, then suggesting remedies. It also requires monitoring for at least 35 years or until no danger remains.

  4. Biogas Impurities and Cleanup for Fuel Cells

    Broader source: Energy.gov (indexed) [DOE]

    Biogas Impurities and Cleanup for Fuel Cells Dennis Papadias and Shabbir Ahmed Argonne National Laboratory Presented at the Biogas and Fuel Cells Workshop Golden, CO June 11-13,...

  5. Microsoft Word - California_cleanup.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Completes California Sites Cleanup CARLSBAD, N.M., June 14, 2010 - The U.S. ... 40 miles east of San Francisco and about seven miles southwest of Livermore, California. ...

  6. Nuclear radiation cleanup and uranium prospecting

    DOE Patents [OSTI]

    Mariella, Jr., Raymond P.; Dardenne, Yves M.

    2016-02-02

    Apparatus, systems, and methods for nuclear radiation cleanup and uranium prospecting include the steps of identifying an area; collecting samples; sample preparation; identification, assay, and analysis; and relating the samples to the area.

  7. Environmental Cleanup Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Audit of Moab Mill Tailings Cleanup Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah...

  8. 2012 Congressional Nuclear Cleanup Caucus Briefings

    Broader source: Energy.gov [DOE]

    The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress.

  9. Y-12 National Security Complex Cleanup

    Broader source: Energy.gov [DOE]

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects completed at the Y-12 National Security Complex.

  10. Site Transition Process Upon Cleanup Completion | Department of Energy

    Energy Savers [EERE]

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup Completion More Documents & Publications Recommendation 198: Establish a site transition process Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites EM SSAB Conference Calls - January 27, 2011

  11. Cleanup Progress Report - 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Cleanup Progress Report - 2011 In this issue, learn about EM's accomplishments in 2011 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park DOE Selects New Cleanup Contractor K-25 East Wing Demolition Begins K-33 Building Demolished Oak Ridge National Laboratory 2000 Complex Demolition Completed Bethel Valley Burial Ground Remediation Completed Bethel Valley Groundwater

  12. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  13. 2015 DOE National Cleanup Workshop | Department of Energy

    Energy Savers [EERE]

    DOE National Cleanup Workshop 2015 DOE National Cleanup Workshop Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program DOE Assistant Secretary for Environmental Management Monica Regalbuto speaks to more than 350 people at the National Cleanup Workshop just outside Washington, D.C. Read more Panelists Update Workshop Participants on Waste Isolation Pilot Plant

  14. Hanford History - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford History About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Hanford History Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The Hanford Site sits on 586-square-miles of shrub-steppe desert in southeastern Washington State. Beginning in 1943, the site was used to produce plutonium for the bomb that brought an end to World War II. After a short lull, production was ramped up in 1947 to meet the challenges of the

  15. Workers Make History by Demolishing Manhattan Project Facilities |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Workers Make History by Demolishing Manhattan Project Facilities Workers Make History by Demolishing Manhattan Project Facilities February 16, 2016 - 1:45pm Addthis Once K-27 is demolished, it will mark the first-ever cleanup of an entire gaseous diffusion complex anywhere. | Office of Environmental Management video David Sheeley David Sheeley Editor/Writer For the first time in history, workers will complete the demolition and cleanup of an entire gaseous diffusion

  16. The Application of NEPA to CERCLA Cleanups

    Broader source: Energy.gov [DOE]

    On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under the CERCLA Superfund program. The meeting focused on proposals for addressing problems that have arisen from DOE's attempts to integrate the procedural and analytical approaches of NEPA into the CERCLA cleanup process. This document describes what was discussed at the meeting and the consensus reached there.

  17. Material Disposal Area G Clean-up Overview and Status

    Broader source: Energy.gov [DOE]

    At the January 29, 2014 Board meeting Jeff Mousseau LANL, Provided Information on the Strategy for Closing of Technical Area 54 MDA G. Information Included the Process for Site Characterization, Remediation and the Path Forward.

  18. EM's Cleanup Mission: 16 Sites in 11 States Remaining

    Broader source: Energy.gov [DOE]

    At the end of fiscal year 2013, EM completed cleanup and closed 90 sites in 28 states. This included cleanup and closure of 85 smaller sites and five major nuclear sites: Rocky Flats, Fernald, Mound, Pinellas, and Weldon Spring.

  19. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  20. Site Transition Process upon Completion of the Cleanup Mission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's internal site transition process for Cleanup to long-term stewardship, post-cleanup, ... a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. ...

  1. EM Presents Video Highlights of Cleanup Across DOE Complex in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presents Video Highlights of Cleanup Across DOE Complex in YouTube Playlist EM Presents Video Highlights of Cleanup Across DOE Complex in YouTube Playlist April 20, 2016 - 12:00pm ...

  2. DOE Extends Idaho Cleanup Project Contract

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID- The U.S. Department of Energy’s Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015.

  3. DOE Completes TRU Waste Cleanup at Bettis

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M.– The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP).

  4. Hanford Progresses in Burial Ground Cleanup

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) and cleanup contractor Washington Closure Hanford (WCH) are making tremendous progress cleaning up Hanford’s 618-10 Burial Ground, one of the most hazardous burial grounds in the EM complex.

  5. 2013 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. PDF icon 04/24/2013 - FY14 Budget Overview for Clean Up Caucus PDF icon 05/07/2013 - Office of River Protection PDF icon 05/16/2013 - Oak Ridge Congressional Nuclear Cleanup Caucus PDF icon 05/21/2013 -

  6. Independent Oversight Review, Idaho Cleanup Project- August 2014

    Broader source: Energy.gov [DOE]

    Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Contractor Readiness Assessment at the Idaho Site.

  7. Lawrence Berkeley National Laboratory Launches Cleanup and Demolition

    Office of Environmental Management (EM)

    Project | Department of Energy Berkeley National Laboratory Launches Cleanup and Demolition Project Lawrence Berkeley National Laboratory Launches Cleanup and Demolition Project June 30, 2015 - 12:00pm Addthis The Lawrence Berkeley National Laboratory Old Town area. The Lawrence Berkeley National Laboratory Old Town area. Site boundary fencing wraps around the Old Town work area for the cleanup project. Site boundary fencing wraps around the Old Town work area for the cleanup project. The

  8. EM Releases Supporting Materials From DOE's First National Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop | Department of Energy Releases Supporting Materials From DOE's First National Cleanup Workshop EM Releases Supporting Materials From DOE's First National Cleanup Workshop November 9, 2015 - 10:00am Addthis EM Releases Supporting Materials From DOE’s First National Cleanup Workshop WASHINGTON, D.C. - EM is making available support materials from the first-ever DOE National Cleanup Workshop. The materials include links to 15 videos that capture addresses by Energy Secretary

  9. ETTP Cleanup and Reindustrialization Finishing What We Started

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Ken Rueter, President, URS-CH2M Oak Ridge (UCOR).

  10. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  11. Enterprise Assessments Review, Idaho Cleanup Project- September 2014

    Broader source: Energy.gov [DOE]

    Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site

  12. PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... PPPO Program Management Health, Safety, & Quality Assurance Safeguards & Security Compliance & Risk Assessment Budget & Funding Contracts & Procurement Future Use PPPO Cleanup ...

  13. The Office of Environmental Management Non-Defense Environmental Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Non-Defense Environmental Cleanup The Office of Environmental Management Non-Defense Environmental Cleanup PDF icon Microsoft Word - 8E2A4440.doc More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D

  14. Beam History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Beam History Print Beamline History Request Form To request a beam current histograph from the ALS storage ring beam histograph database, select the year, month, and day, then click on "Submit Request". Histographs are available as far back as February 2, 1994. Year 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Day 01 02 03 04 05 06 07 08 09 10 11 12 13

  15. Cleanup Progress Report - 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Cleanup Progress Report - 2010 In this issue, learn about EM's accomplishments in 2010 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park K-25 Building West Wing Demolished Contaminated Surface Water, Groundwater at ETTP Addressed Reindustrialization Program Continues Effort to Privatize ETTP Oak Ridge National Laboratory Demolition Completed at 3026 C&D Six Facilities

  16. Cleanup Progress Report - 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Cleanup Progress Report - 2012 In this issue, learn about EM's accomplishments in 2012 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park K-25 Building demolition continues DOE selects commemoration options for K-25 Closure activities continue for TSCA Incinerator Oak Ridge National Laboratory Contaminated Tank W-1A and soil removed Isotope Row material removed Several

  17. Cleanup Progress Report - 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Cleanup Progress Report - 2013 Read about EM's accomplishments across the Oak Ridge Reservation in 2013. Some of the stories include: East Tennessee Technology Park Last standing section of K-25 Building being demolished K-27 Building being prepared for demolition Iconic ETTP Fire Water Tower demolished Efforts under way to commemorate the K-25 site Oak Ridge National Laboratory 3026 hot cells facility downgraded and maintained in surveillance and maintenance mode Upgrade of 4500 Area Gaseous

  18. Cleanup Progress Report - 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Cleanup Progress Report - 2014 Read about EM's accomplishments across the Oak Ridge Reservation in 2014. Some of the stories include: East Tennessee Technology Park K-25 Building demolished K-31 demolition begins Progress continues on commemorating the K-25 Site Parcels transferred as ETTP Reindustrialization progresses Oak Ridge National Laboratory Waste handling plan approved for Molten Salt Reactor Experiment Facility Prep work continues for U-233 disposition Y-12 National Security Complex

  19. Cleanup Progress Report - 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Cleanup Progress Report - 2015 Read about EM's accomplishments across the Oak Ridge Reservation in 2015. Some of the stories include: East Tennessee Technology Park K-31 Building demolition completed K-27 Building demolition will eliminate final ETTP gaseous diffusion facility K-1037 demo prep begins K-25 historic preservation efforts progress Reindustrialization Program continues land reuse efforts Oak Ridge National Laboratory Components removed from Oak Ridge Research Reactor Prep work

  20. Dumping pump and treat: rapid cleanups using thermal technology

    SciTech Connect (OSTI)

    Newmark, R.L.; Aines, R.D.

    1997-03-11

    Underground spills of volatile hydrocarbons are often difficult to clean up, especially if the contaminants are present in or below the water table as a separate liquid-organic phase. Excavating and treating the contaminated soil may not be practical or even possible if the affected zone is relatively deep. Merely pumping groundwater has proven to be ineffective because huge amounts of water must be flushed through the contaminated area to clean it; even then the contaminants may not be completely removed. Due to the low solubility of most common contaminants, such pump and treat systems can be expected to take decades to centuries to actually clean a site. Today, many sites are required to pump and treat contaminated groundwater even though there is no expectation that the site will be cleaned. In these cases, the pumps simply control the spread of the contaminant, while requiring a continuous flow of money, paperwork, and management attention. Although pump and treat systems are relatively inexpensive to operate, they represent along term cost. Most importantly, they rarely remove enough contaminant to change the property`s status. Although a pump and treat system can offer compliance in a regulatory sense, it doesn`t solve the site`s liability problem. Thermal methods promise to solve this dilemma by actually cleaning a property in a short time period, thus limiting the period of liability. This may involve cleaning a site to closure during the initial contaminant-removal phase, or removal of the majority of the contaminant so that natural processes such as bioremediation can return the site to pristine condition over a period of years, without further owner intervention. Today`s regulatory environment encourages this approach through efforts such as the brownfields initiatives. In either case, this requires a strong commitment on the part of the site owner. Most if not all the cleanup occurs within the first year or so, and nearly all the cost. In our experience, the total cleanup cost is still significantly smaller than with conventional methods. The real benefit is the cleanup and thus the removal of liability within a realistic time frame.

  1. Heuristic status polling

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Heidelberger, Philip; Kumar, Sameer; Parker, Jeffrey J.; Ratterman, Joseph D.

    2011-06-07

    Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

  2. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect (OSTI)

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a

  3. Manhattan Project Truck Unearthed in Recovery Act Cleanup | Department of

    Energy Savers [EERE]

    Energy Manhattan Project Truck Unearthed in Recovery Act Cleanup Manhattan Project Truck Unearthed in Recovery Act Cleanup A Los Alamos National Laboratory (LANL) excavation crew working on an American Recovery and Reinvestment Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project landfill. The truck was unearthed inside a sealed building where digging is taking place at Material Disposal Area B (MDA-B), the Lab's first hazardous and

  4. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  5. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  6. November 2015 Newsletter - Los Alamos Field Office Legacy Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy November 2015 Newsletter - Los Alamos Field Office Legacy Cleanup November 2015 Newsletter - Los Alamos Field Office Legacy Cleanup November 30, 2015 - 12:00pm Addthis TA-21-286 being demolished TA-21-286 being demolished Safety Safety and health record for October is clean Safe storage plan for nitrate salts has been completed and implemented. Contracts/Acquisition Removing concrete at the airport landfill Los Alamos Legacy Cleanup Bridge Contract commenced October 1

  7. Idaho Cleanup Project Clearance Limits for Personal Property | Department

    Energy Savers [EERE]

    of Energy Idaho Cleanup Project Clearance Limits for Personal Property Idaho Cleanup Project Clearance Limits for Personal Property Kevin Konzen*, CH2M-WG Idaho, LLC ; Craig Nesshoefer, Idaho Cleanup Project Abstract: CH2M-WG Idaho, LLC (CWI) had sought alternative surface clearance limits for personal property from those referenced in DOE Order 458.1, which were approved September 2013 by the Department of Energy. Because much of the property would remain within DOE control, implementation

  8. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June

    Energy Savers [EERE]

    2007 | Department of Energy Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Facilities Engineering Services KCP, LLC during the period of June 4-15, 2007, and provides the Chief Health, Safety and Security Officer with

  9. Lab receives an additional $19 million for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab receives an additional $19 million for environmental cleanup Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Lab receives an additional $19 million for environmental cleanup Lab also selects local businesses for five-year contracts June 1, 2013 Governor Susana Martinez visited the Lab in May to urge additional funding for cleanup Governor Susana Martinez visited the Lab in May to urge

  10. Environmental Remediation program completes legacy mercury cleanup near

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smith's Marketplace Stories » Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a high-angle canyon-side cleanup on U.S. Department of Energy property just south of Smith's Marketplace. May 1, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. In ongoing efforts to reduce the

  11. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site |

    Office of Environmental Management (EM)

    Department of Energy EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site December 17, 2015 - 12:40pm Addthis RICHLAND, Wash. - In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure

  12. Biogas Impurities and Cleanup for Fuel Cells | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impurities and Cleanup for Fuel Cells Biogas Impurities and Cleanup for Fuel Cells Presentation about biogas technologies and integration with fuel cells. Presented by Shabbir Ahmed, Argonne National Laboratory, at the NREL/DOE Biogas and Fuel Cells Workshop held June 11-13, 2012, in Golden, Colorado. PDF icon june2012_biogas_workshop_ahmed.pdf More Documents & Publications Workshop on Gas Clean-Up for Fuel Cell Applications Fuel Quality Issues in Stationary Fuel Cell Systems Expanding the

  13. Particulate hot gas stream cleanup technical issues

    SciTech Connect (OSTI)

    Pontius, D.H.; Snyder, T.R.

    1999-09-30

    The analyses of hot gas stream cleanup particulate samples and descriptions of filter performance studied under this contract were designed to address problems with filter operation that have been linked to characteristics of the collected particulate matter. One objective of this work was to generate an interactive, computerized data bank of the key physical and chemical characteristics of ash and char collected from operating advanced particle filters and to relate these characteristics to the operation and performance of these filters. The interactive data bank summarizes analyses of over 160 ash and char samples from fifteen pressurized fluidized-bed combustion and gasification facilities utilizing high-temperature, high pressure barrier filters.

  14. Recommendation 220: Recommendation Regarding Maintaining Funding for Cleanup

    Broader source: Energy.gov [DOE]

    The Environmental Management Site-Specific Advisory Board recommends that funding for cleanup at DOE sites should be maintained as a top priority.

  15. Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...

    Office of Environmental Management (EM)

    Independent Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup Project ... Commission (NRC), several nuclear power generating utilities, and associated ...

  16. Abandoned Uranium Mine Technical Services and Cleanup Industry...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Abandoned Uranium Mine Technical Services and Cleanup Industry Day In January 2015, the United States (U.S.) and the Anadarko Litigation Trust ("Litigation Trust") entered into a...

  17. Example Cleanup: Removal of Polychlorinated Biphenyls from Hillside...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Example Cleanup Removal of Polychlorinated Biphenyls from Hillside 140 Removing the source is one of three defenses in depth, as illustrated at the PCB removal from Hillside 140. ...

  18. DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop September 15, 2015 - 12:00pm Addthis DNFSB Chairman Connery to Speak at DOE National Cleanup Workshop WASHINGTON, D.C. - Defense Nuclear Facilities Safety Board (DNFSB) Chairman Joyce Connery is set to speak at the first DOE National Cleanup Workshop, scheduled to be held Sept. 29-30 in the Washington, D.C. area. Connery joins a list of

  19. Moab Marks 6-Million-Ton Cleanup Milestone

    Broader source: Energy.gov [DOE]

    MOAB, Utah – 6,000,000 is a big number, and it marks a significant cleanup milestone in the Beehive State.

  20. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, ... DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of ...

  1. Secretary Chu, Governor Gregoire Issue Statement on Hanford Cleanup

    Broader source: Energy.gov [DOE]

    U.S. Energy Secretary Steven Chu and Governor Chris Gregoire issued a joint statement on the cleanup efforts underway at Hanford.

  2. Cleanup Contractor at Paducah Site Receives Performance Excellence Award

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – The environmental cleanup contractor at EM’s Paducah site has been honored for demonstrating serious commitment to performance improvement principles.

  3. FY14 Guidelines for Brownfields Cleanup Grants | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FY14 Guidelines for Brownfields Cleanup GrantsPermittingRegulatory...

  4. Draft Public Involvement Advice for Central Plateau Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    V0, 12914 Draft Public Involvement Advice for Central Plateau Cleanup Principles Issue managers: Pollet, Mattson, Vanni, Plahuta, Catrell Background The Tri-Party Agencies are...

  5. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Alumni Link: Opportunities, News ... Latest Issue:September 2015 all issues All Issues submit Probing Fukushima with cosmic ...

  6. Probing Fukushima with cosmic rays should help speed cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays Probing Fukushima with cosmic rays should help speed cleanup of damaged plant The initiative could reduce the time required to clean up the ...

  7. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID – The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE’s Idaho site.

  8. A message of appreciation from ORP to its cleanup partners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy A message of appreciation from ORP to its cleanup partners A message of appreciation from ORP to its cleanup partners Addthis Description A message of appreciation from ORP to its cleanup partners

  9. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2

    SciTech Connect (OSTI)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J.

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

  10. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    SciTech Connect (OSTI)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J.

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  11. Colorado and the Accelerated Cleanup at Rocky Flats

    SciTech Connect (OSTI)

    Spreng, C.

    2007-07-01

    When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

  12. Improving oiled shoreline cleanup with COREXIT 9580

    SciTech Connect (OSTI)

    Fiocco, R.J.; Lessard, R.R.; Canevari, G.P.

    1996-08-01

    The cleanup of oiled shorelines has generally been by mechanical, labor-intensive means. The use of a chemical shoreline cleaner to assist in water-flushing oil from the surfaces can result in more complete and more rapid cleaning. Not only is the cleaning process more efficient, but it can also be less environmentally damaging since there is potentially much less human intrusion and stress on the biological community. This paper describes research and applications of COREXIT 9580 shoreline cleaner for treatment of oiled shorelines, including four recent applications in Puerto Rico, Bermuda, Texas and Nova Scotia. Research work on shoreline vegetation, such as mangroves, has also demonstrated the potential use of this product to save and restore oiled vegetation.

  13. Public Understanding of Cleanup Levels Discussion Public Involvement Committee Meeting - Hanford Advisory Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discussion Public Involvement Committee Meeting - Hanford Advisory Board Wednesday, October 31, 2012 - Red Lion Hanford House, Richland Page 1 of 4 Cleanup Levels One of the reasons we want public involvement on cleanup decisions is to gather input about what kind of cleanup end-state the public wants, how clean is clean, or put another way, how dirty is acceptable. Cleanup decisions are complicated. Cleanup levels necessary to be protective dictate which cleanup actions are viable to consider.

  14. Richland Operations Office Cleanup Strategy, Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during Cold War (peaking between 1959-1965) * ...

  15. DOE extends the Idaho Cleanup Project contract for three years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract

  16. DOE Awards Legacy Cleanup Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legacy Cleanup Contract DOE Awards Legacy Cleanup Contract September 23, 2015 - 6:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today announced the award of a Cost-Plus-Award Fee contract to Los Alamos National Security, LLC (LANS) of Los Alamos, NM. This bridge contract is for the Office of Environmental Management (EM) funded legacy cleanup activities at the Los Alamos National Laboratory (LANL). LANS is

  17. Tritium research laboratory cleanup and transition project final report

    SciTech Connect (OSTI)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  18. Accelerating Clean-up at Savannah River

    Office of Environmental Management (EM)

    S. Department of Energy April 27, 2010 2 Outline of Presentation * Background - GAO High-Risk List - Root Cause Analysis (RCA) and Corrective Action Plan (CAP) * Current Status of...

  19. Sixth Chapter of Hanford Story Released to Public: Chapter Covers History

    Energy Savers [EERE]

    and Cleanup of Most Hazardous Facility at Hanford | Department of Energy Sixth Chapter of Hanford Story Released to Public: Chapter Covers History and Cleanup of Most Hazardous Facility at Hanford Sixth Chapter of Hanford Story Released to Public: Chapter Covers History and Cleanup of Most Hazardous Facility at Hanford April 18, 2012 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE (509) 376-5365, Cameron.Hardy@rl.doe.gov RICHLAND, Wash. - The Department of Energy is releasing the sixth

  20. DOE extends the Idaho Cleanup Project Contract for Three Years

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department’s Idaho Site.

  1. Wendy Cain named portfolio federal project director for ETTP cleanup

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Oak Ridge Office of Environmental Management has named Wendy Cain as its new portfolio federal project director for cleanup of the East Tennessee Technology Park.

  2. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Solicitations > ICP Contract Idaho Cleanup Project Contract Basic Contract Contract Modifications Documents Related to the ICP Contract Last Updated: 11/04/2015 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  3. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts, Financial Assistance & Solicitations > ICP-Core Contract Idaho Cleanup Project (ICP) Core Basic Contract Contract Modifications Other Documents Last Updated: 03/22/2016 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  4. DOE's Top Environmental Cleanup Official Visits Paducah Site

    Broader source: Energy.gov [DOE]

    PADUCAH, KY – Cost-efficiency is a top priority as the Department of Energy makes challenging decisions on how to best use environmental cleanup dollars, said Dave Huizenga, Senior Advisor of DOE Environmental Management (EM).

  5. Energy Secretary Moniz to Speak at DOE National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – U.S. Energy Secretary Ernest Moniz is set to provide opening remarks at the first DOE National Cleanup Workshop, scheduled to be held Sept. 29-30 in the Washington, D.C. area.

  6. Microsoft PowerPoint - DFT Syngas Cleanup_3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Density Functional Theory Study of Syngas Cleanup with Ceria-Based Rare Earth Oxides Matthew D. Krcha 1 , Adam D. Mayernick 1 , Michael J. Janik 1 , Kerry M. Dooley 2 1 Department...

  7. Oak Ridge Reflects on 30 Years of Cleanup

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program hosted an event this month that documented the site’s environmental cleanup efforts since 1983, six years before the official founding of the Department’s EM.

  8. Recovery Act Funded Environmental Cleanup Begins at Y-12

    Broader source: Energy.gov [DOE]

    Environmental cleanup activities are under way at Y-12 with the removal of excess equipment and scrap materials from Beta 4 (Building 9204-4) and Alpha 5 (Building 9201-5).

  9. DOE Selects Contractor for California Energy Technology Engineering Center Cleanup

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a competitive $25.7 million task order for cleanup activities at the Energy Technology Engineering Center (ETEC) to North Wind of Idaho Falls, Idaho.

  10. Top EM Leadership to Participate in 2016 National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM’s senior leaders are set to join the 2016 National Cleanup Workshop in mid-September in the Washington, D.C.-area.

  11. Los Alamos Legacy Clean-up Completion Project Bridge Contract

    Broader source: Energy.gov [DOE]

    At the December 10, 2014 Special meeting Jack Craig DOE HQ, Provided Information on the Bridge Contract for the Shift from NNSA Oversight to EM Oversight for LANL Environmental Clean-up.

  12. EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – At a ceremony today, Oak Ridge’s Environmental Management (EM) program and its prime contractor, URS | CH2M Oak Ridge, LLC (UCOR) celebrated the completion of the site’s reconciled cleanup contract.

  13. RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES

    Broader source: Energy.gov [DOE]

    Carlsbad, NM - The recent completion of transuranic (TRU) waste cleanup at Vallecitos Nuclear Center (VNC) and Lawrence Livermore National Laboratory (LLNL) Site 300 in California brings the total number of sites cleared of TRU waste to 17.

  14. New Idaho Cleanup Project Contractor Unveils Management Team...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Project (ICP), Fluor Idaho, LLC, has unveiled its senior management team. "The 90-day transition process is now halfway complete and Fluor Idaho, LLC, is on track to ...

  15. EM SSAB Contributes Community Views to Clean-up Decisions

    Broader source: Energy.gov [DOE]

    EM has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB, which draws upon diverse community viewpoints to provide advice and recommendations,...

  16. Example Cleanup: Removal of Polychlorinated Biphenyls from Hillside 140

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Example Cleanup Removal of Polychlorinated Biphenyls from Hillside 140 Removing the source is one of three defenses in depth, as illustrated at the PCB removal from Hillside 140. August 1, 2013 Men vacuuming PCB contamination from Hillside 140 using large pipes and pullies Vacuuming PCB contamination from Hillside 140 Water and sediment is sampled periodically for contaminants. If PCB waste is present, it is shipped to licensed disposal facilities. Two cleanups of radioactive materials were

  17. Registration Now Open for 2016 National Cleanup Workshop in September |

    Office of Environmental Management (EM)

    Mission Mission The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The EM program has made significant progress in shifting away from risk management to embracing a mission completion philosophy based on reducing risk and reducing environmental liability. As an established operating cleanup completion and risk

  18. Glass Science Could Boost Hanford Cleanup | Department of Energy

    Energy Savers [EERE]

    Glass Science Could Boost Hanford Cleanup Glass Science Could Boost Hanford Cleanup October 29, 2015 - 12:30pm Addthis A canister filled with nonradioactive glass sits on display. A canister filled with nonradioactive glass sits on display. A sample of vitrified glass at EM's Office of River Protection. A sample of vitrified glass at EM's Office of River Protection. A glass scientist works with molten glass. A glass scientist works with molten glass. A canister filled with nonradioactive glass

  19. Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup |

    Energy Savers [EERE]

    Department of Energy Winning Entry Proposes Efficiencies to Tank Waste Cleanup Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup December 29, 2015 - 12:55pm Addthis From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna, Pacific Northwest National Laboratory scientist; Albert Kruger, ORP glass scientist; and Kevin Smith, ORP manager. From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna,

  20. DOE Idaho site reaches 20-year cleanup milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major

  1. December 2015 Newsletter - Los Alamos Field Office Legacy Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy December 2015 Newsletter - Los Alamos Field Office Legacy Cleanup December 2015 Newsletter - Los Alamos Field Office Legacy Cleanup December 31, 2015 - 12:00pm Addthis Sewage Treatment Facility at TA-21 before demolition Sewage Treatment Facility at TA-21 before demolition Debris from demolition of TA-21 Sewage Treatment Facility Debris from demolition of TA-21 Sewage Treatment Facility Sewage Treatment Facility at TA-21 before demolition Debris from demolition of TA-21

  2. EM Cleanup Chief Discusses Path Forward for DOE's Excess Facilities |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cleanup Chief Discusses Path Forward for DOE's Excess Facilities EM Cleanup Chief Discusses Path Forward for DOE's Excess Facilities April 27, 2016 - 1:00pm Addthis Panel moderator Jenny Freeman, president of the Energy Technology and Environmental Business Association (second from left), talks as panelists (left to right) Ken Harrawood, senior director of Y-12 Legacy Facility Disposition, Mark Duff, director of Environmental Management, Fluor Paducah Deactivation

  3. Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods

    Energy Savers [EERE]

    | Department of Energy Undergoing Steady Groundwater Cleanup with Variety of Methods Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods June 1, 2012 - 12:00pm Addthis The yellow outline depicts an area southeast of the C-400 Cleaning Building, background, where electrical resistance heating will be used to remove trichloroethene (TCE) down to 60 feet below ground. Electrodes will heat the chemical into a vapor that can be pumped to the surface and treated in the white

  4. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |

    Energy Savers [EERE]

    Department of Energy Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it

  5. Probing Fukushima with cosmic rays should speed cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Probing Fukushima with cosmic rays should speed cleanup Probing Fukushima with cosmic rays should speed cleanup The initiative could reduce the time required to clean up the disabled complex by at least a decade and greatly reduce radiation exposure to personnel working at the plant. June 18, 2014 Los Alamos National Laboratory postdoctoral researcher Elena Guardincerri, right, and undergraduate research assistant Shelby Fellows prepare a lead hemisphere inside a muon tomography machine, which

  6. Draft Public Involvement Advice for Central Plateau Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    V0, 12/9/14 Draft Public Involvement Advice for Central Plateau Cleanup Principles Issue managers: Pollet, Mattson, Vanni, Plahuta, Catrell Background The Tri-Party Agencies are developing principles that will guide the cleanup of Hanford's Central Plateau. The Hanford Advisory Board (HAB) believes that the broader public should be involved in the development of these principles. Hanford's Central Plateau is planned to be the final footprint of the Hanford Site. The Central Plateau contains

  7. Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals

    Office of Environmental Management (EM)

    | Department of Energy Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals June 26, 2013 - 12:00pm Addthis The 200 West Pump and Treat System is Hanford’s largest facility for treating contaminated groundwater. The 200 West Pump and Treat System is Hanford's largest facility for treating contaminated groundwater. A graphic showing the 200 West Pump and Treat plumes and well network. A graphic

  8. EM Assistant Secretary Highlights Cleanup Workers at Annual Conference |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Highlights Cleanup Workers at Annual Conference EM Assistant Secretary Highlights Cleanup Workers at Annual Conference March 31, 2016 - 1:20pm Addthis EM Assistant Secretary Dr. Monica Regalbuto speaks during the Waste Management Conference plenary session earlier this month. EM Assistant Secretary Dr. Monica Regalbuto speaks during the Waste Management Conference plenary session earlier this month. PHOENIX - EM Assistant Secretary Dr. Monica Regalbuto praised the

  9. Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site |

    Office of Environmental Management (EM)

    Department of Energy Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site October 26, 2011 - 8:14am Addthis Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery Act engineer now works for the U.S. Enrichment Corp. Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery

  10. Savannah River Site Takes on Another Environmental Cleanup Challenge:

    Office of Environmental Management (EM)

    Coal-Fired Ash | Department of Energy Takes on Another Environmental Cleanup Challenge: Coal-Fired Ash Savannah River Site Takes on Another Environmental Cleanup Challenge: Coal-Fired Ash July 29, 2015 - 12:00pm Addthis SRNS environmental engineers Ron Socha (left) and Frank Sappington inspect earth-moving work within a basin containing coal ash. SRNS environmental engineers Ron Socha (left) and Frank Sappington inspect earth-moving work within a basin containing coal ash. One of the

  11. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    SciTech Connect (OSTI)

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  12. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Users Live Status Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Move to CRT Getting Started...

  13. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

  14. EM Talks Cleanup Progress with State and Tribal Government Working Group |

    Office of Environmental Management (EM)

    Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. To date, EM has made substantial progress in nearly every area of nuclear waste cleanup and completed cleanup at 91 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive

  15. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    SciTech Connect (OSTI)

    Zhu, Ming; Moorer, Richard

    2013-07-01

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in integrated risk assessment that could assist in the EM prioritization efforts. (authors)

  16. The Office of Environmental Management (EM) Defense Environmental Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy (EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup PDF icon Microsoft Word - 271C2C7B.doc More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. In addition, on the right: K Cooling Tower at Savannah River Site demolition. Deactivation & Decommissioning (D&D) Program Map Microsoft Word - PSRP Updates

  17. Hanford Story: Tank Waste Cleanup - Questions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Hanford Story Hanford Story: Tank Waste Cleanup - Questions The Hanford Story Hanford Story: Tank Waste Cleanup - Questions Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Why is the Waste Treatment Plant being built? Where did the waste in the Tank Farms come from? How many gallons of waste are contained in the tanks? Why is removing the waste from the tanks so challenging? What is the Mobile Arm Retrieval System (MARS)? How will the tank waste be delivered

  18. IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact: Jon Hanian (208) 334-2100 For Immediate Release: June 27, 2013 IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY (IDAHO FALLS) - Governor C.L. "Butch" Otter joined U.S. Department of Energy officials today in announcing that a critically important cleanup project will be resuming at the Idaho National Laboratory. The project involves the "legacy" radioactive and hazardous waste generated during Cold War weapons production in the 1950s and 1960s that

  19. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  20. DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technical Assistance Contract for Moab Mill Tailings Cleanup DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup May 31, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati-The U.S. Department of Energy (DOE) today announced the award of an $18 million small disadvantaged business contract with S&K Aerospace, LLC, of St. Ignatius, Montana to continue to provide technical assistance services for the Moab

  1. Recovery Act funds advance cleanup efforts at Cold War site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup efforts at Cold War site Recovery Act funds advance cleanup efforts at Cold War site A local small business, ARSEC Environmental, LLC, of White Rock, NM, won a $2 million task order in April to perform this work. June 29, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

  2. F Reactor Area Cleanup Complete | Department of Energy

    Office of Environmental Management (EM)

    F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete September 19, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated. While six of Hanford's nine plutonium production reactors have been sealed up, or cocooned, the F Reactor Area is the first to

  3. Manhattan Project truck unearthed at landfill cleanup site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan project truck Manhattan Project truck unearthed at landfill cleanup site A LANL excavation crew working on a Recovery Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. April 8, 2011 image description Excavator operator Kevin Miller looks at the remnants of a 1940s military truck buried in a Manhattan Project-era landfill. Contact Fred deSousa Communications Office (505) 665-3430 Email Remnants of a 1940s military truck

  4. Mercury cleanup efforts intensify | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mercury cleanup efforts ... Mercury cleanup efforts intensify Posted: February 11, 2013 - 3:31pm | Y-12 Report | Volume 9, Issue 2 | 2013 Millions of pounds of mercury were required to support Y-12's post-World War II mission of separating lithium isotopes. Cleaning up the toxic heavy metal poses many challenges, but what Y-12 is learning could help conquer mercury pollution worldwide. There's a reason you won't find mercury in many thermometers these days. Mercury is a heavy metal that occurs

  5. EM's Defense Waste Processing Facility Achieves Waste Cleanup Milestone |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Defense Waste Processing Facility Achieves Waste Cleanup Milestone EM's Defense Waste Processing Facility Achieves Waste Cleanup Milestone January 14, 2016 - 12:10pm Addthis The Defense Waste Processing Facility. The Defense Waste Processing Facility. If 4,000 of the 10-feet tall, 2-feet wide canisters were laid end to end, they would stretch more than 7.5 miles. If 4,000 of the 10-feet tall, 2-feet wide canisters were laid end to end, they would stretch more than 7.5

  6. U.S. Department of Energy Keeps Its Cleanup Commitments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy Keeps Its Cleanup Commitments By ELIZABETH SELLERS As significant progress continues on cleanup of legacy environmental challenges at the Idaho National Laboratory, there are two points I'd like to emphasize: Workers sort previously-buried waste. Inside of underground waste storage tank after cleaning was completed ready for grouting to begin. The U.S. Department of Energy is keeping its promises to Idahoans. In the last 20 years, DOE has met, on time or ahead of

  7. From Pushing Paper to Pushing Dirt - Canada's Largest LLRW Cleanup Gets Underway - 13111

    SciTech Connect (OSTI)

    Veen, Walter van; Lawrence, Dave

    2013-07-01

    The Port Hope Project is the larger of the two projects in the Port Hope Area Initiative (PHAI), Canada's largest low level radioactive waste (LLRW) cleanup. With a budget of approximately $1 billion, the Port Hope Project includes a broad and complex range of remedial elements from a state of the art water treatment plant, an engineered waste management facility, municipal solid waste removal, remediation of 18 major sites within the Municipality of Port Hope (MPH), sediment dredging and dewatering, an investigation of 4,800 properties (many of these homes) to identify LLRW and remediation of approximately 450 of these properties. This paper discusses the status of the Port Hope Project in terms of designs completed and regulatory approvals received, and sets out the scope and schedule for the remaining studies, engineering designs and remediation contracts. (authors)

  8. Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial...

    Office of Scientific and Technical Information (OSTI)

    Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial Fusion Energy Power Plant Citation Details In-Document Search Title: Flibe Coolant Cleanup and Processing in the ...

  9. Technical papers presented at a DOE meeting on criteria for cleanup of transuranium elements in soil

    SciTech Connect (OSTI)

    Not Available

    1984-09-01

    Transuranium element soil contamination cleanup experience gained from nuclear weapons accidents and cleanup at Eniwetok Atoll was reviewed. Presentations have been individually abstracted for inclusion in the data base. (ACR)

  10. DOE, RTI to Design and Build Gas Cleanup System for IGCC Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis ...

  11. DOE and NASA Reach Cleanup Agreements with the State of California...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NASA Reach Cleanup Agreements with the State of California for the Santa Susana Field Laboratory DOE and NASA Reach Cleanup Agreements with the State of California for the Santa ...

  12. Los Alamos Lab to perform slope-side cleanup near Smith's Marketplace

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos Lab to perform slope-side cleanup near Smith's Marketplace Los Alamos National Laboratory to perform slope-side cleanup near Smith's Marketplace The Lab is performing a ...

  13. Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program

    Broader source: Energy.gov [DOE]

    DOE Assistant Secretary for Environmental Management Monica Regalbuto shared her vision for EM, laid out cleanup priorities, and emphasized the need to better leverage technology development to reduce costs in her address at DOE’s first National Cleanup Workshop.

  14. Agencies announce third site-wide five-year review of cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    five-year review of cleanup at the U.S. Department of Energy's Idaho Site. Five-year reviews evaluate the protectiveness of completed and ongoing cleanup actions as required...

  15. Cleanup Verification Package for the 118-F-6 Burial Ground

    SciTech Connect (OSTI)

    H. M. Sulloway

    2008-10-02

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

  16. Head of EM to Kick Off Congressional Nuclear Cleanup Caucus

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM Senior Advisor Dave Huizenga will provide an overview of EM’s proposed fiscal year 2014 budget Thursday in the first of six briefings for the 19th annual U.S. House Nuclear Cleanup Caucus.

  17. Oak Ridge EM Program Increases Focus on Mercury Cleanup

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM Senior Advisor Dave Huizenga recently joined local lawmakers and state and federal officials to announce their partnership to increase focus on cleanup of mercury — one of Oak Ridge’s greatest environmental threats — at the Y-12 National Security Complex.

  18. National Nuclear Security Administration Official Tours Cleanup Operations for Navy

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Adm. James F. Caldwell Jr., director of the DOE National Nuclear Security Administration’s Naval Nuclear Propulsion Program, recently toured the Hanford Site cleanup activities managed by EM’s Richland Operations Office (RL). RL Manager Stacy Charboneau welcomed Caldwell to the site.

  19. EM Delegation Tours UK Cleanup Program’s Sellafield Site

    Broader source: Energy.gov [DOE]

    A senior-level EM delegation led by Associate Principal Deputy Assistant Secretary Alice Williams visited the United Kingdom’s Sellafield nuclear site to gain insight into the cleanup projects and facilities under the jurisdiction of the UK’s Nuclear Decommissioning Authority (NDA).

  20. DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone

    Broader source: Energy.gov [DOE]

    In a project sponsored by the U.S. Department of Energy (DOE), a demonstration-scale application of RTI International’s warm synthesis gas (syngas) cleanup process technology has achieved a key operational milestone at Tampa Electric Company’s coal gasification plant in Polk County, Fla.

  1. Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

    Energy Savers [EERE]

    (September 2013) | Department of Energy Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, post-cleanup, and post-closure has been established in transition guidance for sites that will transfer to a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. PDF icon Site

  2. 2015 U.S. Department of Energy National Cleanup Workshop Registration List

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 5 U.S. Department of Energy National Cleanup Workshop Registration List 2015 U.S. Department of Energy National Cleanup Workshop Registration List List of registered attendees to the 2015 U.S. Department of Energy National Cleanup Workshop. PDF icon 2015 U.S. Department of Energy National Cleanup Workshop Registration List More Documents & Publications Business Opportunity Forum Attendees EM Major Contracts Awarded Since 2006 Contractor Earned Value Management

  3. Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule

    Broader source: Energy.gov [DOE]

    The Hanford Site recently surpassed American Recovery and Reinvestment Act goals to accelerate the cleanup of legacy waste and fuels.

  4. DOE Completes Cleanup at New York, California Sites- Recovery Act funds accelerate cleanup; support job creation and footprint reduction

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California.

  5. Evolution of the Business Environment Surrounding the UK's Nuclear Site Cleanup Program

    SciTech Connect (OSTI)

    Miskimin, P.A.; Lees, P.M.; Wall, C.E.E.

    2006-07-01

    In April 2005 twenty civil nuclear sites in the United Kingdom became the responsibility of the Nuclear Decommissioning Authority (NDA), a new organization created by the British Government to manage the cleanup of these sites. As a key part of this transition, the NDA became the owner and manager of these sites, which formerly were owned by the site operators, British Nuclear Fuels Limited plc (BNFL) and the United Kingdom Atomic Energy Authority (UKAEA). This was one of the most significant events in the history of the United Kingdom's nuclear industry and represented a true sea change, affecting many aspects of life and business on and around these sites as well as nationally. The NDA's budget for the cleanup of the twenty sites and the management of the overall cleanup program is approximately pounds 2 Billion per annum, almost $4 Billion. It is important to note that approximately half of this amount is spent with the supply chains which serve the management and operations contractors, including pounds 500 million at Sellafield alone. Additionally, the site management and operations contractors receive most of the pounds 2 Billion through contracts between the NDA and the various site management companies. This represents a lot of government money moving through contracts between entities, which invokes procurement and contracting rules and regulations, that while not new, have not previously been this broadly applied to nuclear site cleanup activities throughout the UK. The current estimate for the total life cycle cleanup costs for all twenty civil nuclear sites is pounds 56 Billion, a figure that is likely to increase further. The first rules to mention are the European Union Procurement Guidelines, which are designed to help ensure that procurements involving government funds are conducted in an open, fair, and transparent environment. While it is difficult to argue with the intent of these rules, at least for now they are having a slowing down effect on placing contracts via the major procurements being conducted in support of the nuclear site cleanup program. The next most powerful influence is the NDA itself, which has oversight responsibility for procurements conducted by the site management and operations contractors. The NDA must, of necessity, maintain some level of review over major procurements, but how best to do so with a limited number of staff, without slowing down the awarding of contracts? More dramatic in their impact on the UK's nuclear industry will be the competitive procurements to be conducted by the NDA to select the best site operators for the twenty sites. These major procurements, while common in the USA and elsewhere, will be new to the NDA's nuclear site cleanup program. Considering the large contract values expected, the procurements should attract some of the best talent in nuclear site cleanup. It is anticipated that these procurements will necessitate contractors to compete at the highest level, leaving no stone unturned to maximize the chance of being selected. Contract awards are expected to be in the range of 100 million pounds to several billion pounds. The first such procurement is currently planned to begin in April 2006, according to the NDA's draft strategy document. Lastly, the business relationships with local suppliers to the nuclear sites are also changing. These suppliers will be required to compete, primarily for contracts let by subcontractors to the site management and operations contractors, and even by sub-sub contractors, rather than directly from the site management and operations contractors. The benign paternalism previously practiced at some sites by the management and operations contractors should also cease, of necessity. Many other business aspects will evolve as well, such as contract awards being based on best value, rather than on lowest price or lowest hourly rate. Electronic commerce is expected to become more widely used. Even as late as 2003, little electronic commerce was being utilized at the nuclear sites now being managed by the NDA. Contracting terms are expected to move toward a more commercial orientation, a process already begun. This paper will examine the changing procurement and contracting environment under the NDA's leadership and will provide information of interest to contractors wishing to win their share (and more) of business in the emerging nuclear site cleanup program in the United Kingdom. (authors)

  6. DOE's First National Cleanup Workshop Set for Sept. 29-30 | Department of

    Energy Savers [EERE]

    Energy First National Cleanup Workshop Set for Sept. 29-30 DOE's First National Cleanup Workshop Set for Sept. 29-30 July 31, 2015 - 3:00pm Addthis DOE National Cleanup Workshop DOE National Cleanup Workshop WASHINGTON, D.C. - DOE, in cooperation with the Energy Communities Alliance, Energy Facility Contractors Group, and Nuclear Energy Institute, will hold the first DOE National Cleanup Workshop Sept. 29 and 30 this year in the Washington, D.C. area. The workshop brings together senior DOE

  7. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be complete in Idaho and remaining nuclear materials will be in safe storage. The ICP Core contract is a performance based contract type that includes Cost-Plus-Incentive-Fee (CPIF) Contract Line Item Numbers (CLINs) with hybrid fee structures for both CPIF and schedule milestone and performance incentive fees; and a Cost-Plus-Fixed-Fee (CPFF) CLIN. The estimated dollar value for this procurement is greater than $1 Billion, with a five year period of performance. This procurement will be full and open competition.

  8. Combining innovative technology demonstrations with dense nonaqueous phase liquids cleanup

    SciTech Connect (OSTI)

    Hagood, M.C.; Koegler, K.J.; Rohay, V.J.; Trent, S.J.; Stein, S.L.; Brouns, T.M.; McCabe, G.H.; Tomich, S.

    1993-05-01

    Radioactively contaminated acidic aqueous wastes and organic liquids were discharged to the soil column at three disposal sites within the 200 West Area of the Hanford Site, Washington. As a result, a portion of the underlying groundwater is contaminated with carbon tetrachloride several orders of magnitude above the maximum contaminant level accepted for a drinking water supply. Treatability testing and cleanup actions have been initiated to remove the contamination from both the unsaturated soils to minimize further groundwater contamination and the groundwater itself. To expedite cleanup, innovative technologies for (1) drilling, (2) site characterization, (3) monitoring, (4) well field development, and (5) contaminant treatment are being demonstrated and subsequently used where possible to improve the rates and cost savings associated with the removal of carbon tetrachloride from the soils and groundwater.

  9. ORISE: Supporting ARRA funded cleanup activities in Oak Ridge, Tenn.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORISE supporting Oak Ridge reservation cleanup activities through recovery funding ORISE technician performs an environmental scan Disposing of old and contaminated buildings, and remediating soil and groundwater across the Oak Ridge Reservation has long been a priority for the U.S. Department of Energy (DOE)-Oak Ridge Office (ORO). Though much of the work wasn't expected to begin for another three to four years, the acquisition of $755 million in American Recovery and Reinvestment Act (ARRA)

  10. Cleanup Verification Package for the 618-3 Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2006-09-12

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings.

  11. Rocky Flats Cleanup Agreement implementation successes and challenges

    SciTech Connect (OSTI)

    Shelton, D.C.

    1997-02-01

    On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

  12. History of Hanford Site Defense Production (Brief)

    SciTech Connect (OSTI)

    GERBER, M S

    2001-02-01

    This paper acquaints the audience with the history of the Hanford Site, America's first full-scale defense plutonium production site. The paper includes the founding and basic operating history of the Hanford Site, including World War II construction and operations, three major postwar expansions (1947-55), the peak years of production (1956-63), production phase downs (1964-the present), a brief production spurt from 1984-86, the end of the Cold War, and the beginning of the waste cleanup mission. The paper also delineates historical waste practices and policies as they changed over the years at the Hanford Site, past efforts to chemically treat, ''fractionate,'' and/or immobilize Hanford's wastes, and resulting major waste legacies that remain today. This paper presents original, primary-source research into the waste history of the Hanford Site. Finally, the paper places the current Hanford Site waste remediation endeavors in the broad context of American and world history.

  13. Hanford Story Wins Northwest Emmy Award: Video Provides Overview of History and Cleanup of Hanford Site

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The first chapter of The Hanford Story multimedia series, Hanford Overview, has received an Emmy for best Historical/Cultural – Program/Special.

  14. Our History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Our History /about/_assets/images/icon-70th.jpg Our History The Lab has a proud history and heritage of almost 70 years of science and innovation. The people at the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to the nation's most crucial security challenges. Los Alamos Gate 1942 Our primary responsibility throughout the decades: national security The primary responsibility of the Laboratory is assuring the safety and reliability of the

  15. History Images

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Images Los Alamos History in Images Los Alamos has a proud history and heritage of almost 70 years of science and innovation. The people of the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to many of the nation's most crucial security challenges. Click thumbnails to enlarge. Photos arranged by most recent first, horizontal formats before vertical. See Flickr for more sizes and details. Back in the day Back in the day LA bridge in Los

  16. History Gallery

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Gallery History Gallery Exhibits in this gallery capture Laboratory's history of the secret town of Los Alamos and its role with the Manhattan Project. August 18, 2014 museum plan showing the history gallery Los Alamos, once the site of a boys' ranch school, became the focus of the secret project to develop a new weapon, one that derived its power from splitting the atom. The Atomic Age begins The conflict that darkened Europe in the late 1930s at first cast no shadow here on the sunny

  17. Application of NEPA to CERCLA and RCRA Cleanup Actions (DOE, 2002) |

    Energy Savers [EERE]

    Department of Energy Application of NEPA to CERCLA and RCRA Cleanup Actions (DOE, 2002) Application of NEPA to CERCLA and RCRA Cleanup Actions (DOE, 2002) The document clarifies DOE policies to streamline the environmental review of actions to be taken under CERCLA and RCRA. PDF icon DOE Policies on Application of NEPA to CERCLA and RCRA Cleanup Actions More Documents & Publications Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements

  18. Public Understanding of Cleanup Levels DRAFT FAQ Public Involvement Committee Meeting, Hanford Advisory Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DRAFT FAQ Public Involvement Committee Meeting, Hanford Advisory Board Wednesday, June 5, 2013 at the Red Lion Hanford House in Richland Cleanup Levels The better the public understands how cleanup levels are set to determine what the acceptable levels of residual contamination may be left at Hanford, the more effective and meaningful their input into cleanup decisions will be. We must stay informed in order to stay involved and provide meaningful input. Here are some frequently asked questions

  19. Microsoft Word - DOE News Release-DOE Completes Cleanup at New York California Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Completes Cleanup at New York, California Sites Recovery Act funds accelerate cleanup; support job creation and footprint reduction WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18 th and 19 th sites to be completely cleaned of legacy waste. This

  20. LANL selects local small business for post-Recovery Act cleanup contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post-Recovery Act cleanup contract LANL selects local small business for post-Recovery Act cleanup contract Los Alamos Technical Associates to perform follow-on cleanup work through 2014 at the site of the world's first large-scale plutonium processing lab. December 14, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

  1. Cleanup Verification Package for the 116-K-2 Effluent Trench

    SciTech Connect (OSTI)

    J. M. Capron

    2006-04-04

    This cleanup verification package documents completion of remedial action for the 116-K-2 effluent trench, also referred to as the 116-K-2 mile-long trench and the 116-K-2 site. During its period of operation, the 116-K-2 site was used to dispose of cooling water effluent from the 105-KE and 105-KW Reactors by percolation into the soil. This site also received mixed liquid wastes from the 105-KW and 105-KE fuel storage basins, reactor floor drains, and miscellaneous decontamination activities.

  2. Union job fight boiling at DOE cleanup sites

    SciTech Connect (OSTI)

    Setzer, S.W.

    1993-11-15

    The US DOE is facing a growing jurisdictional dispute over which unions will perform the majority of clean-up work at its facilities. Unions affiliated with the AFL-CIO Metal Trades Council representing operations employees at the sites believe they have a fundamental right to work. Unions in the AFL-CIO's Building and Construction Trades Dept. insist that they have a clear mandate under federal labor law and the Davis-Bacon Act. The issue has heated up in recent weeks at the policy level and is boiling in a contentious dispute at DOE's Fernald site in Ohio.

  3. Recovery Cleanup Project at Y-12 Leaves Alpha 5 with an Empty...

    National Nuclear Security Administration (NNSA)

    Cleanup Project at Y-12 Leaves Alpha 5 with an Empty Feeling | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  4. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project...

    National Nuclear Security Administration (NNSA)

    Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  5. Flue gas cleanup using the Moving-Bed Copper Oxide Process (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Journal Article: Flue gas cleanup using the Moving-Bed Copper Oxide Process Citation Details In-Document Search Title: Flue gas cleanup using the Moving-Bed Copper Oxide Process The use of copper oxide on a support had been envisioned as a gas cleanup technique to remove sulfur dioxide (SO{sub 2}) and nitric oxides (NO{sub x}) from flue gas produced by the combustion of coal for electric power generation. In general, dry, regenerable flue gas cleanup techniques

  6. Sue Cange Provides Insight on Oak Ridge’s Cleanup Progress, Partnerships

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Sue Cange, manager for the Oak Ridge Office of Environmental Management, is responsible for safely executing the environmental cleanup of the Oak Ridge Reservation.

  7. Microsoft PowerPoint - DOE_Central Plateau approach to cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CERCLA guidance, the National Contingency Plan, and the State of Washington Model Toxics Control Act (MTCA). * Purpose: To define an approach for consistent cleanup decisions...

  8. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  9. Biogas Cleanup Challenges and R&D Needs for Fuel Cells

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biogas Cleanup Challenges and R&D Needs for Fuel Cells Chakravarthy Sishtla, Gas ... Workshop March 7, 2014 3 GTI Recent Biogas Projects > Gills Onions-Anaerobic ...

  10. EM Presents Video Highlights of Cleanup Across DOE Complex in YouTube

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Playlist | Department of Energy Presents Video Highlights of Cleanup Across DOE Complex in YouTube Playlist EM Presents Video Highlights of Cleanup Across DOE Complex in YouTube Playlist April 20, 2016 - 12:00pm Addthis EM's YouTube playlist features 55 videos of cleanup accomplishments and other events across the DOE complex. EM's YouTube playlist features 55 videos of cleanup accomplishments and other events across the DOE complex. WASHINGTON, D.C. - EM continues to add footage of its

  11. An Update on the Hanford Site and Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Site and Cleanup Progress An Update on the Hanford Site and Cleanup Progress September 24, 2013 - 6:45pm Addthis An Update on the Hanford Site and Cleanup Progress Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? For 40 years, the Hanford Site in Washington state was involved in the production of plutonium as part of our national defense efforts. Legacy cleanup progress at the Hanford site has been significant, including 100 percent of the site's spent fuel

  12. Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed; Report Now Available Online | Department of Energy Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE)

  13. Oak Ridge’s EM Program Seeks Public Input on Cleanup

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge's EM office held a public meeting this week to discuss the program’s upcoming budget and cleanup priorities.

  14. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  15. River Corridor Work Creates Legacy of Success in Cleanup of Nation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    such as hexavalent chromium and radioactive material such as strontium and uranium. ... backfill activities earlier this year after a chromium contamination cleanup project. ...

  16. Los Alamos Lab to perform slope-side cleanup near Smith's Marketplace

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos Lab to perform slope-side cleanup near Smith's Marketplace Los Alamos National Laboratory to perform slope-side cleanup near Smith's Marketplace The Lab is performing a high-angle canyon-side cleanup on U.S. Department of Energy property just south of the new Smith's Marketplace. May 1, 2015 Los Alamos National Laboratory To complete cleanup activities at one of the few remaining legacy sites along Los Alamos Canyon, crews are using a specialized spider excavator to remove a small

  17. DOE Announces Start of Recovery Act Funded Cleanup Projects at Y-12

    Broader source: Energy.gov [DOE]

    DOE announces that cleanup of the Old Salvage Yard at the Y-12 National Security Complex has started using funding received from the Recovery Act.

  18. Much Accomplished at Hanford in 2010: Richland Operations Office Prime Contractors Cite Past Year's Cleanup Progress

    Broader source: Energy.gov [DOE]

    RICHLAND, WASH. – The Department of Energy (DOE) Richland Operations Office contractors achieved a great deal of cleanup progress at the Hanford Site in 2010.

  19. DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    four years to expand and accelerate cleanup efforts of Cold War-era contamination at the Portsmouth uranium enrichment facility adjacent to the American Centrifuge Plant (ACP). ...

  20. ESnet History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESnet History About ESnet Our Mission The Network ESnet History Governance & Policies Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net ESnet History View ESnet's 25-year anniversary timeline in PDF. »Download the PDF. (PDF | 500KB) 1976 - MFEnet provides data links

  1. ORISE: History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History The Oak Ridge Institute for Science and Education (ORISE) is a national leader in science education and research, with programs dating back to 1946 and having served as an...

  2. Making History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    YGG 05-0181 Making History It's hard to imagine . . . . . . an entire city existing in secret. . . . 60,000 acres set aside for one, top-secret purpose. . . . a discovery so huge...

  3. Our History

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy has the longest directly-traceable history of any organization in the Department of Energy. While the nuclear energy program can look back to the Manhattan Project of...

  4. Workshop History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshop History The 2014 event is the seventh joint workshop held by the EFCOG ESH Electrical Safety subgroup. The first "joint" Electrical Safety Workshop was held in the summer...

  5. DOE Awards Contract for Idaho Clean-up Project (ICP) Core

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in support of the DOE Office of Environmental Management’s cleanup mission at the Idaho Site.

  6. DOE Releases Draft Request for Proposal for Los Alamos Legacy Cleanup Contract

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for the Los Alamos Legacy Cleanup Contract (LLCC) acquisition. A contract that primarily includes cost-plus-award-fee contract line items for the purpose of continuing the legacy cleanup mission is anticipated.

  7. EM Contractor’s Success in Addressing Challenging Waste Leads to More Cleanup Work

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The EM program’s Idaho Site cleanup contractor CH2M-WG Idaho’s (CWI) success last year in treating and packaging 6,000 drums of radioactive and hazardous waste left over from the Cold War weapons program has spawned additional cleanup work for the company.

  8. EM Updates Congress on Nuclear Cleanup Progress in 18th Annual Caucus

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM and its cleanup contractors present briefings each year to the U.S. House Nuclear Cleanup Caucus on remediation operations at its major sites across the DOE complex. The briefings are organized by Rep. Doc Hastings (R-Wash.), who chairs the bipartisan caucus.

  9. Secretary Moniz Kicks Off Inaugural National Cleanup Workshop with Call for Collaboration to Address EM’s Challenges

    Broader source: Energy.gov [DOE]

    Energy Secretary Ernest Moniz commenced DOE’s first-ever National Cleanup Workshop last week by highlighting recent major EM accomplishments and emphasizing the importance of working together to overcome remaining challenges in the cleanup program.

  10. Building upon Historical Competencies: Next-generation Clean-up Technologies for World-Wide Application - 13368

    SciTech Connect (OSTI)

    Guevara, K.C.; Fellinger, A.P.; Aylward, R.S.; Griffin, J.C.; Hyatt, J.E.; Bush, S.R.

    2013-07-01

    The Department of Energy's Savannah River Site has a 60-year history of successfully operating nuclear facilities and cleaning up the nuclear legacy of the Cold War era through the processing of radioactive and otherwise hazardous wastes, remediation of contaminated soil and groundwater, management of nuclear materials, and deactivation and decommissioning of excess facilities. SRS recently unveiled its Enterprise.SRS (E.SRS) strategic vision to identify and facilitate application of the historical competencies of the site to current and future national and global challenges. E.SRS initiatives such as the initiative to Develop and Demonstrate Next generation Clean-up Technologies seek timely and mutually beneficial engagements with entities around the country and the world. One such ongoing engagement is with government and industry in Japan in the recovery from the devastation of the Fukushima Daiichi Nuclear Power Station. (authors)

  11. EM Launches First-Ever Interactive Timeline on Cleanup’s History

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – In honor of its 25th anniversary, EM launched a new timeline this week that offers stakeholders and other members of the public a first-of-a-kind opportunity to view the nuclear cleanup program’s achievements and related Cold War history in an interactive online platform.

  12. Beam History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam History Print Beamline History Request Form To request a beam current histograph from the ALS storage ring beam histograph database, select the year, month, and day, then click on "Submit Request". Histographs are available as far back as February 2, 1994. Year 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Day 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17

  13. Beam History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam History Print Beamline History Request Form To request a beam current histograph from the ALS storage ring beam histograph database, select the year, month, and day, then click on "Submit Request". Histographs are available as far back as February 2, 1994. Year 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Day 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17

  14. A Short History of Waste Management at the Hanford Site

    SciTech Connect (OSTI)

    Gephart, Roy E.

    2010-03-31

    "The worlds first full-scale nuclear reactors and chemical reprocessing plants built at the Hanford Site in the desert of eastern Washington State produced two-thirds of the plutonium generated in the United States for nuclear weapons. Operating these facilities also created large volumes of radioactive and chemical waste, some of which was released into the environment exposing people who lived downwind and downstream. Hanford now contains the largest accumulation of nuclear waste in the Western Hemisphere. Hanfords last reactor shut down in 1987 followed by closure of the last reprocessing plant in 1990. Today, Hanfords only mission is cleanup. Most onsite radioactive waste and nuclear material lingers inside underground tanks or storage facilities. About half of the chemical waste remains in tanks while the rest persists in the soil, groundwater, and burial grounds. Six million dollars each day, or nearly two billion dollars each year, are spent on waste management and cleanup activities. There is significant uncertainty in how long cleanup will take, how much it will cost, and what risks will remain for future generations. This paper summarizes portions of the waste management history of the Hanford Site published in the book Hanford: A Conversation about Nuclear Waste and Cleanup.(1) "

  15. Workshop on Gas Clean-Up for Fuel Cell Applications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop on Gas Clean-Up for Fuel Cell Applications Workshop on Gas Clean-Up for Fuel Cell Applications The U.S. Department of Energy's (DOE's) Argonne National Laboratory (ANL) hosted the Workshop on Gas Clean-Up for Fuel Cell Applications on March 6-7, 2014, in Argonne, Illinois. The workshop was sponsored by the DOE Fuel Cell Technologies Office and included participants from industry, academia, national labs, government agencies, and other stakeholders. The objectives of the workshop were to

  16. Crews Make First Entry into McCluskey Room for Final Cleanup at Hanford

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site | Department of Energy Crews Make First Entry into McCluskey Room for Final Cleanup at Hanford Site Crews Make First Entry into McCluskey Room for Final Cleanup at Hanford Site September 30, 2014 - 12:00pm Addthis Bryan Harting, nuclear chemical operator for CH2M HILL Plateau Remediation Company, was part of the crew that made the first entry to begin final cleanup of the McCluskey Room at Hanford’s Plutonium Finishing Plant this month. Bryan Harting, nuclear chemical operator for

  17. DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife

  18. DOE Completes Cleanup at New York, California Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18th and 19th sites to be completely cleaned of legacy waste. This milestone was

  19. DOE Issues Draft RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project Core DOE Issues Draft RFP for Idaho Cleanup Project Core December 22, 2014 - 2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement. The ICP Core procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  20. DOE Issues Request for Information on Gas Clean-Up for Fuel Cell

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications | Department of Energy Gas Clean-Up for Fuel Cell Applications DOE Issues Request for Information on Gas Clean-Up for Fuel Cell Applications June 1, 2015 - 10:37am Addthis The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office has issued a request for information (RFI) to obtain feedback and opinions from industry, academia, research laboratories, government agencies, and other stakeholders on the report findings from the Gas Clean-up for Fuel Cell Applications

  1. Public comment sought on soil cleanup project at the Idaho Site�s Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area North Complex Public comment sought on soil cleanup project at the Idaho Site�s Test Area North Complex The U.S. Department of Energy (DOE) is seeking public comment on a small-scale soil cleanup at the Idaho Site�s Test Area North (TAN) complex. An Engineering Evaluation/Cost Analysis (EE/CA) document with three proposed alternatives for the soil cleanup is under evaluation by DOE, the U.S. Environmental Protection Agency, and Idaho�s Department of Environmental Quality.

  2. Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 9 Billion Contract for Idaho Site Cleanup Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup March 23, 2005 - 11:07am Addthis WASHINGTON, D.C. - The United States Department of Energy today announced the selection of CH2M-WG Idaho, LLC as the contractor responsible for the Idaho Cleanup Project through the year 2012 at the Idaho National Laboratory (INL). "We are pleased to announce this selection to ensure a seamless transition and continued

  3. From Cleanup to Stewardship. A companion report to Accelerating Cleanup: Paths to Closure and background information to support the scoping process required for the 1998 PEIS Settlement Study

    SciTech Connect (OSTI)

    1999-10-01

    Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closure report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.

  4. Thermal cleanups using dynamic underground stripping and hydrous pyrolysis oxidation

    SciTech Connect (OSTI)

    Aines, R D; Knauss, K; Leif, R; Newmark, R L

    1999-05-01

    In the early 1990s, in collaboration with the School of Engineering at the University of California, Berkeley, Lawrence Livermore National Laboratory developed dynamic underground stripping (DUS), a method for treating subsurface contaminants with heat that is much faster and more effective than traditional treatment methods. more recently, Livermore scientists developed hydrous pyrolysis/oxidation (HPO), which introduces both heat and oxygen to the subsurface to convert contaminants in the ground to such benign products as carbon dioxide, chloride ion, and water. This process has effectively destroyed all contaminants it encountered in laboratory tests. With dynamic underground stripping, the contaminants are vaporized and vacuumed out of the ground, leaving them still to be destroyed elsewhere. Hydrous pyrolysis/oxidation technology takes the cleanup process one step further by eliminating the treatment, handling, and disposal requirements and destroying the contamination in the ground. When used in combination, HPO is especially useful in the final polishing of a site containing significant free-product contaminant, once the majority of the contaminant has been removed.

  5. Stimulus Funding Creating Cleanup Jobs At DOE?s Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stimulus Funding Creating Cleanup Jobs At DOEs Idaho Site Arimo resident Jeff Johnson did something this week he hasnt done since January. He reported to his new job. Funding...

  6. Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The EM program at the Savannah River Site (SRS) is successfully treating contaminated groundwater using passive, natural cleanup measures that have reduced remediation costs by millions of dollars.

  7. High School Students Engage EM Program, Teach Classmates about Nuclear Cleanup

    Broader source: Energy.gov [DOE]

    LAS VEGAS – Two high school students are aspiring to educate their classmates on the Nevada National Security Site’s (NNSS) environmental cleanup program after surveying them to gauge their knowledge of it.

  8. EM Richland Operations Office Manager Reflects on River Corridor's Safe, Successful Cleanup

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – This month, Stacy L. Charboneau marks her first year as manager of EM’s Richland Operations Office (RL), responsible for management and oversight of cleanup of the 586-square-mile Hanford Site.

  9. SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS...

    Office of Scientific and Technical Information (OSTI)

    Other: SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS PRODUCTION WITH ILLINOIS COAL Citation Details In-Document Search Title: SUBTASK 3.12 - GASIFICATION, ...

  10. EM’s December Newsletter Recaps Cold War Cleanup Accomplishments in 2013

    Broader source: Energy.gov [DOE]

    On Dec. 19, EM completed demolition of the 4.8 million-square-foot Building K-25 at Oak Ridge, a milestone that capped a busy and successful 2013 for the Cold War cleanup program.

  11. EM’s Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – EM’s Los Alamos Field Office recently completed a steep canyon-side cleanup of mercury-contaminated soil on DOE property just south of a shopping center here.

  12. EM Assistant Secretary Monica Regalbuto to Speak at DOE National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE's new Assistant Secretary for Environmental Management Monica Regalbuto is set to speak at the first DOE National Cleanup Workshop, scheduled to be held Sept. 29-30 in the Washington, D.C. area.

  13. Second site-wide five-year review of cleanup at DOE?s Idaho...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOEs Idaho site...

  14. EA-1345: Cleanup and Closure of the Energy Technology Engineering Center

    Broader source: Energy.gov [DOE]

    DOE prepared an EA and finding of no significant impact (FONSI) for cleanup and closure of DOE’s Energy Technology Engineering Center at the Santa Susana Field Laboratory in 2003. However, DOE’s...

  15. Workshop on Gas Clean-Up for Fuel Cell Applications - Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Gas Clean-Up for Fuel Cell Applications Sponsored by The Fuel Cell Technologies Office, ... USDOE D. Papageorgopoulos 11:00 AM Natural Gas Fuel Cells: Technology, Advantages and ...

  16. EM Discusses Five-Year Planning Effort at National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    At a key roundtable session of the National Cleanup Workshop, Mark Whitney, Principal Deputy Assistant Secretary for EM, described the program’s initiative to develop and execute a five-year planning effort.

  17. Microsoft Word - DOE News Release-DOE Completes Cleanup at New...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the...

  18. Bill McMillan named federal project director for ORNL cleanup

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Oak Ridge Office of Environmental Management names Bill McMillan as its new federal project director for cleanup at the Oak Ridge National Laboratory.

  19. DOE Awards More than $16 Million for Recovery Act Cleanup at ORNL

    Broader source: Energy.gov [DOE]

    Through the Recovery Act, DOE awards $16.8 million contract to for environmental cleanup operations at ORNL. Under this contract, EM will demolish 34 facilities in the ORNL central campus area.

  20. EM Develops Database for Efficient Solutions to Nuclear Cleanup Challenges Across Complex

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Many deactivation and decommissioning (D&D) projects across the EM complex require robotic and remote handling systems to protect workers during nuclear cleanup operations.

  1. Meeting Offers Opportunity to Discuss EM Cleanup with China | Department of

    Energy Savers [EERE]

    Energy Meeting Offers Opportunity to Discuss EM Cleanup with China Meeting Offers Opportunity to Discuss EM Cleanup with China April 29, 2013 - 12:00pm Addthis Members of the Environment and Waste Management Working Group of the Peaceful Uses of Nuclear Technology Joint Coordinated Committee from DOE include, front row, EM Technical Advisor for Foreign Affairs Rosa Elmetti (center) and EM Office of Tank Waste Management Director Steve Schneider (right); middle row, Lawrence Livermore

  2. In the OSTI Collections: Microbes for Production and Cleanup | OSTI, US

    Office of Scientific and Technical Information (OSTI)

    Dept of Energy, Office of Scientific and Technical Information Microbes for Production and Cleanup View Past"In the OSTI Collections"Articles. Article Acknowledgement: Dr. William N. Watson, Physicist DOE Office of Scientific and Technical Information Environmental cleanup Fuel production References Reports available through DOepatents Reports available through SciTech Reports available through DOE PAGESBeta Like all of our planet's organisms, microbes, in the process of living,

  3. Major Cold War Cleanup Milestone Reached at the Savannah River Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site March 29, 2012 - 10:37am Addthis WASHINGTON, DC - Today, the Energy Department announced it has reached a major milestone in the Department's efforts to clean up the Cold War legacy at the Savannah River Site (SRS) in South Carolina, laying the groundwork for closing two underground storage tanks that previously held radioactive liquid waste

  4. The Application of NEPA to CERCLA Cleanups (Department of Justice, 1995) |

    Energy Savers [EERE]

    Department of Energy The Application of NEPA to CERCLA Cleanups (Department of Justice, 1995) The Application of NEPA to CERCLA Cleanups (Department of Justice, 1995) On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the

  5. DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Los Alamos | Department of Energy DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos October 2, 2015 - 2:30am Addthis Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center announced it intends to solicit by means of full and open competition for a company with the specialized capabilities necessary to successfully

  6. Site Transition Summary: Cleanup Completion to Long-Term Stewardship at

    Energy Savers [EERE]

    Department of Energy On-going Mission Sites | Department of Energy Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Long-term stewardship (LTS) includes the physical controls, institutions, information, and other mechanisms needed to ensure protection of people and the environment at sites where the U.S. Department of Energy

  7. DOE and NASA Reach Cleanup Agreements with the State of California for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Santa Susana Field Laboratory | Department of Energy NASA Reach Cleanup Agreements with the State of California for the Santa Susana Field Laboratory DOE and NASA Reach Cleanup Agreements with the State of California for the Santa Susana Field Laboratory December 6, 2010 - 12:00am Addthis Washington, D.C. - The Department of Energy and NASA both signed Administrative Orders on Consent (AOC) with the California Environmental Protection Agency (Cal EPA) today that define the process for

  8. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Institute | Department of Energy Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE

  9. Microsoft PowerPoint - DOE_Central Plateau approach to cleanup decisions.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approach to Cleanup Decisions Introduction * This approach was previously called the Inner Area Principles. * DOE, EPA, and Ecology prepared the Central Plateau Approach to Cleanup Decisions as a communication tool * This document tries to explain the approach, including the assumptions DOE would like to use. 2 Introduction (continued) * The approach is consistent with CERCLA guidance, the National Contingency Plan, and the State of Washington Model Toxics Control Act (MTCA). * Purpose: To

  10. Probing Fukushima with cosmic rays should help speed cleanup of damaged

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plant Probing Fukushima with cosmic rays Probing Fukushima with cosmic rays should help speed cleanup of damaged plant The initiative could reduce the time required to clean up the disabled complex by at least a decade and greatly reduce radiation exposure to personnel working at the plant. December 22, 2014 Probing Fukushima with cosmic rays should help speed cleanup of damaged plant Los Alamos-generated computer animation of the Fukushima Diachi powerplant. Contact James Rickman

  11. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Getting Started Accounts & Allocations Cori Phase II Schedule Computational Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List

  12. NPDF status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NPDF INSTRUMENT STATUS Waiting for runs .. Last update: Fri Mar 27 04:43:30 2015 NPDF RECENT DATA PLOTTING Select plot: GSAS - PDF

  13. SMARTS status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2016/03/02 14:04:07) Run Number: 97106 Title: Adams Sample 6-4 after heat treat to 1000C [abso strain -10.000 Run Status: ended Last Script Activity: 2016/02/28 20:05:52: End run 97106; mah 300000 abso strain -10.000 100.0 * * * * * * View full script Next Script Command: N/A Proposal#: 7039 Sample#: 2004061 MAH: 302227 Monitor: 132724 Beam Current: 0 Shutter Status: CLSD Used disk space on /home: 59% Used disk space on /disk2: 73% Crate

  14. PROGRESS & CHALLENGES IN CLEANUP OF HANFORDS TANK WASTES

    SciTech Connect (OSTI)

    HEWITT, W.M.; SCHEPENS, R.

    2006-01-23

    The River Protection Project (RPP), which is managed by the Department of Energy (DOE) Office of River Protection (ORP), is highly complex from technical, regulatory, legal, political, and logistical perspectives and is the largest ongoing environmental cleanup project in the world. Over the past three years, ORP has made significant advances in its planning and execution of the cleanup of the Hartford tank wastes. The 149 single-shell tanks (SSTs), 28 double-shell tanks (DSTs), and 60 miscellaneous underground storage tanks (MUSTs) at Hanford contain approximately 200,000 m{sup 3} (53 million gallons) of mixed radioactive wastes, some of which dates back to the first days of the Manhattan Project. The plan for treating and disposing of the waste stored in large underground tanks is to: (1) retrieve the waste, (2) treat the waste to separate it into high-level (sludge) and low-activity (supernatant) fractions, (3) remove key radionuclides (e.g., Cs-137, Sr-90, actinides) from the low-activity fraction to the maximum extent technically and economically practical, (4) immobilize both the high-level and low-activity waste fractions by vitrification, (5) interim store the high-level waste fraction for ultimate disposal off-site at the federal HLW repository, (6) dispose the low-activity fraction on-site in the Integrated Disposal Facility (IDF), and (7) close the waste management areas consisting of tanks, ancillary equipment, soils, and facilities. Design and construction of the Waste Treatment and Immobilization Plant (WTP), the cornerstone of the RPP, has progressed substantially despite challenges arising from new seismic information for the WTP site. We have looked closely at the waste and aligned our treatment and disposal approaches with the waste characteristics. For example, approximately 11,000 m{sup 3} (2-3 million gallons) of metal sludges in twenty tanks were not created during spent nuclear fuel reprocessing and have low fission product concentrations. We plan to treat these wastes as transuranic waste (TRU) for disposal at the Waste Isolation Pilot Plant (WIPP), which will reduce the WTP system processing time by three years. We are also developing and testing bulk vitrification as a technology to supplement the WTP LAW vitrification facility for immobilizing the massive volume of LAW. We will conduct a full-scale demonstration of the Demonstration Bulk Vitrification System by immobilizing up to 1,100 m{sup 3} (300,000 gallons) of tank S-109 low-curie soluble waste from which Cs-137 had previously been removed. This past year has been marked by both progress and new challenges. The focus of our tank farm work has been retrieving waste from the old single-shell tanks (SSTs). We have completed waste retrieval from three SSTs and are conducting retrieval operations on an additional three SSTs. While most waste retrievals have gone about as expected, we have faced challenges with some recalcitrant tank heel wastes that required enhanced approaches. Those enhanced approaches ranged from oxalic acid additions to deploying a remote high-pressure water lance. As with all large, long-term projects that employ first of a kind technologies, we continue to be challenged to control costs and maintain schedule. However, it is most important to work safely and to provide facilities that will do the job they are intended to do.

  15. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  16. Fuel Cell Development Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development Status Fuel Cell Development Status Presented at the DOE-DOD Shipboard APU Workshop on March 29, 2011. PDF icon apu2011_7_short.pdf More Documents & Publications PAFC History and Successes MCFC and PAFC R&D Workshop Summary Report PAFC Cost Challenges

  17. REGULATORY STRATEGIES TO MINIMIZE GENERATION OF REGULATED WASTES FROM CLEANUP, CONTINUED USE OR DECOMMISSIONING OF NUCLEAR FACILITIES CONTAMINATED WITH POLYCHLORINATED BIPHENYLS (PCBS) - 11198

    SciTech Connect (OSTI)

    Lowry, N.

    2010-11-05

    Disposal costs for liquid PCB radioactive waste are among the highest of any category of regulated waste. The high cost is driven by the fact that disposal options are extremely limited. Toxic Substances Control Act (TSCA) regulations require most liquids with PCBs at concentration of {ge} 50 parts-per-million to be disposed by incineration or equivalent destructive treatment. Disposal fees can be as high as $200 per gallon. This figure does not include packaging and the cost to transport the waste to the disposal facility, or the waste generator's labor costs for managing the waste prior to shipment. Minimizing the generation of liquid radioactive PCB waste is therefore a significant waste management challenge. PCB spill cleanups often generate large volumes of waste. That is because the removal of PCBs typically requires the liberal use of industrial solvents followed by a thorough rinsing process. In a nuclear facility, the cleanup process may be complicated by the presence of radiation and other occupational hazards. Building design and construction features, e.g., the presence of open grating or trenches, may also complicate cleanup. In addition to the technical challenges associated with spill cleanup, selection of the appropriate regulatory requirements and approach may be challenging. The TSCA regulations include three different sections relating to the cleanup of PCB contamination or spills. EPA has also promulgated a separate guidance policy for fresh PCB spills that is published as Subpart G of 40 CFR 761 although it is not an actual regulation. Applicability is based on the circumstances of each contamination event or situation. Other laws or regulations may also apply. Identification of the allowable regulatory options is important. Effective communication with stakeholders, particularly regulators, is just as important. Depending on the regulatory path that is taken, cleanup may necessitate the generation of large quantities of regulated waste. Allowable options must be evaluated carefully in order to reduce compliance risks, protect personnel, limit potential negative impacts on facility operations, and minimize the generation of wastes subject to TSCA. This paper will identify critical factors in selecting the appropriate TSCA regulatory path in order to minimize the generation of radioactive PCB waste and reduce negative impacts to facilities. The importance of communicating pertinent technical issues with facility staff, regulatory personnel, and subsequently, the public, will be discussed. Key points will be illustrated by examples from five former production reactors at the DOE Savannah River Site. In these reactors a polyurethane sealant was used to seal piping penetrations in the biological shield walls. During the intense neutron bombardment that occurred during reactor operation, the sealant broke down into a thick, viscous material that seeped out of the piping penetrations over adjacent equipment and walls. Some of the walls were painted with a PCB product. PCBs from the paint migrated into the degraded sealant, creating PCB 'spill areas' in some of these facilities. The regulatory cleanup approach selected for each facility was based on its operational status, e.g., active, inactive or undergoing decommissioning. The selected strategies served to greatly minimize the generation of radioactive liquid PCB waste. It is expected that this information would be useful to other DOE sites, DOD facilities, and commercial nuclear facilities constructed prior to the 1979 TSCA ban on most manufacturing and uses of PCBs.

  18. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  19. 2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

    SciTech Connect (OSTI)

    Harp, Benton; Charboneau, Stacy; Olds, Erik

    2012-07-01

    The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be recei

  20. New Generation Dresden NPP Demineralizer Vault Cleanup Project

    SciTech Connect (OSTI)

    Denton, M.S.; CET, Ph.D.; Forrester, K.; Azar, M.

    2008-07-01

    Electro-coagulation (EC) is a technique that facilitates rapid destabilization and flocculation of colloidal suspensions to cause the suspended solids to separate from slurry phase. It is generally accepted that coagulation is brought about primarily by the reduction of the net surface charge to a point where the colloidal particles, previously stabilized by electrostatic repulsion, can approach closely enough for van der Waals forces to hold them together and allow aggregation. In the EC process, the coagulant is generated in situ by electrolytic oxidation of an appropriate anode material (aluminum in this case). In this process, charged ionic species, metals or otherwise, and suspended solids are removed from wastewater by allowing them to interact with an ion having opposite charge, or with floc of metallic hydroxides generated electrochemically within the effluent. Typically, no supplementary organic polymer coagulant addition is required. Thus, electro-coagulation (EC) was found to be an attractive treatment option to rapidly destabilize the colloidal particulate phase, allowing more facile particulate removal by decantation and/or coarse filtration. However, the liquid medium must have some conductivity (> 100 {mu}mho is preferred), in order to allow effective electrical coupling with the EC electrodes. A very small amount of aluminum or sodium sulfate salts can be added to the feed slurry, adjusting the water quality parameters to a conductivity of >100 {mu}mho and a pH value near 6.0-7.0. The EC-treated vault slurry had a pH value near 6.5 (within the pH range for minimal solubility of amphoteric aluminum hydroxide). In contrast to untreated wastewater, the agglomerated particles in the EC-treated aliquot could be filtered relatively rapidly, yielding a clear filtrate, indicating that the flocs that have been formed are now > 20- {mu}m in size, are pumpable (high shear strength), and filterable/dewaterable with ease (low water content). Final waste volumes also show that the actual volumetric fraction of solids produced are relatively small. In order to estimate the amount of material (Al or Fe depending on the electrode material) added by the EC process, a rough rule of thumb has been found to be {approx}15 ppm per amp-minute. It was found with most wastewaters that Cs seeding (if that step is required) added {approx} 100 ppm Cs Seed and 10-15 ppm/amp minute additional floc from the electrodes. In a typical BWR wastewater case, where the TSS represented {<=} 0.15 wt% ({approx}1500 ppm). At 1.5 amp-min., the Al (III) added by the EC process would be {approx} 20 ppm, or {approx} 60 ppm as Al(OH){sub 3}. It was found the relatively low floc [{approx} 40 ppm as dried Al(OH){sub 3}] worked quite well for the high colloid level present ({approx}1500 ppm), and would be even more enhanced with the use of recycle. Even at that relatively low treatment dose, the colloidal TSS in the wastewater was effectively flocculated to yield agglomerates that were easily filtered and dewatered. Another rule of thumb is that, empirically, TDS (in mg/l) is typically {approx}0.5 X conductivity (in umho/cm). For instance, a conductivity reading of 100 umho/cm corresponds to about 50 ppm of TDS. As can be seen, the amount of material actually added in this vault cleanup of {approx}15 ppm per amp-min compared to the existing {approx}1500 ppm of TDS present (0.5 X conductivity of 3000 {mu}mho/cm) is minimal. In this vault cleanup, as a precautionary measure, the HIC was a specially designed Press-Pak with internal sheet filters, final dewatering leg, and a expandable, outer bladder if needed for final dewatering. It was found after filling the first HIC, of two, that the material dewatered and passed final dewatering tests without the need for the precautionary Press-Pak feature. Original estimates by the evaluation team estimated it would take some 11 to 12 HICs to remove the vault contents to a remote location for treatment, dewatering and final shipment. With the use of the SAFE{sup TM} Solution, the project was completed dur

  1. History of Hydropower | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History of Hydropower History of Hydropower

  2. Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial Fusion

    Office of Scientific and Technical Information (OSTI)

    Energy Power Plant (Technical Report) | SciTech Connect Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial Fusion Energy Power Plant Citation Details In-Document Search Title: Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial Fusion Energy Power Plant In the HYLIFE-II chamber design, a thick flowing blanket of molten-salt (Li{sub 2}BeF{sub 4}) called flibe is used to protect structures from radiation damage. Since it is directly exposed to the fusion target, the

  3. Idaho Cleanup Project completes work at Test Area North complex at DOE�s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho site Idaho Cleanup Project completes work at Test Area North complex at DOE�s Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all the original contract work scope at the U.S. Department of Energy�s Idaho Site�s Test Area North (TAN) complex. The work involved close cooperation among the Department of Energy, the Environmental Protection Agency and the Idaho Department of Environmental Quality, with public input incorporated

  4. Idaho Cleanup Project ships first Recovery Act-funded remote-handled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transuranic waste out of Idaho THE IDAHO SITE NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 Joseph Campbell (CWI) 208-360-0142 For Immediate Release March 18, 2010 Idaho Cleanup Project ships first Recovery Act- funded remote-handled transuranic waste out of Idaho DATELINE - The Idaho Cleanup Project made its first shipment of remote-handled transuranic waste funded by the American Recovery and Reinvestment Act on March 11, 2010. This is the first of approximately 150 shipments

  5. PPPL's Earth Week features Colloquium on NYC green plan, cleanup and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    awards | Princeton Plasma Physics Lab PPPL's Earth Week features Colloquium on NYC green plan, cleanup and awards By Jeanne Jackson DeVoe April 28, 2014 Tweet Widget Google Plus One Share on Facebook Volunteers clean up the area outside PPPL's Lyman Spitzer Building during the Earth Day cleanup at PPPL on April 22. From left to right: Virginia Finley, Julia Toth, Bill Davis, Glenn Anderson and Shannon Greco. (Photo by Elle Starkman/PPPL Office of Communications) Volunteers clean up the area

  6. The Department of Energy Announces Major Cold War Legacy Waste Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone | Department of Energy The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone September 28, 2011 - 8:54am Addthis CARLSBAD, NM - The U.S. Department of Energy today announced that the Waste Isolation Pilot Plant (WIPP) received its 10,000th shipment of transuranic (TRU) waste over the weekend. This marks an important milestone in DOE's mission to clean up the country's Cold

  7. Hanford Site Cleanup Challenges and Opportunities for Science and Technology--A Strategic Assessment

    SciTech Connect (OSTI)

    Wood, Thomas W.; Johnson, Wayne L.; Kreid, Dennis K.; Walton, Terry L.

    2001-02-01

    The sheer expanse of the Hanford Site, the inherent hazards associated with the significant inventory of nuclear materials and wastes, the large number of aging contaminated facilities, the diverse nature and extent of environmental contamination, and the proximity to the Columbia River make Hanford perhaps the world's largest and most complex environmental cleanup project. It is not possible to address the more complex elements of this enormous challenge in a cost-effective manner without strategic investments in science and technology. Success requires vigorous and sustained efforts to enhance the science and technology basis, develop and deploy innovative solutions, and provide firm scientific bases to support site cleanup and closure decisions at Hanford.

  8. Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site | Department of Energy Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site August 1, 2012 - 12:00pm Addthis Workers near completion of the non-technetium area of K-25’s east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. Workers near completion of the non-technetium area of K-25's east wing (left). Oak Ridge anticipates beginning demolition

  9. Idaho Site Workers Continue to Finish D&D Cleanup Projects Under Budget |

    Energy Savers [EERE]

    Department of Energy Site Workers Continue to Finish D&D Cleanup Projects Under Budget Idaho Site Workers Continue to Finish D&D Cleanup Projects Under Budget November 16, 2015 - 12:10pm Addthis Workers demolish a sodium processing facility just north of the Experimental Breeder Reactor-II’s silver dome at the Idaho Site. Workers demolish a sodium processing facility just north of the Experimental Breeder Reactor-II's silver dome at the Idaho Site. IDAHO FALLS, Idaho - CH2M-WG

  10. 2009-04 "Priorities for ARRA Stimulus Funding for Environmental Clean-up at LANL"

    Office of Energy Efficiency and Renewable Energy (EERE)

    Approved May 14, 2009 The intent of this recommendation is to encourage LASO and the DOE Office of Environmental Management to shoe immediate and beneficial acceleration of the clean-up of legacy waste at LANL and to encourage additional ARRA funding be provided for the use at LANL. Further, the intent of this recommendation is to provide future employment opportunities for the citizens of Northern New Mexico in the high-paying clean-up jobs over the next several years at LANL.

  11. DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Los Alamos | Department of Energy Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos October 2, 2015 - 2:30pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center announced it intends to solicit by means of full and open competition for

  12. Department of Energy reaches an agreement in principle on the cleanup of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Santa Susana Field Lab site in Simi Valley | Department of Energy reaches an agreement in principle on the cleanup of the Santa Susana Field Lab site in Simi Valley Department of Energy reaches an agreement in principle on the cleanup of the Santa Susana Field Lab site in Simi Valley September 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The Department of Energy announced today that it has reached an agreement in principle with California's Department of Toxic Substances Control (DTSC)

  13. Forward Thinking of Employees at Hanford Site Helps in Accelerated Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Forward Thinking of Employees at Hanford Site Helps in Accelerated Cleanup Forward Thinking of Employees at Hanford Site Helps in Accelerated Cleanup April 27, 2016 - 12:15pm Addthis An ancillary building in the H Reactor Area is among many in the soil and groundwater program that was demolished ahead of schedule. An ancillary building in the H Reactor Area is among many in the soil and groundwater program that was demolished ahead of schedule. RICHLAND, Wash. - EM's

  14. Hanford Site Lays Out New Vision for Next Decade of Cleanup Progress |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lays Out New Vision for Next Decade of Cleanup Progress Hanford Site Lays Out New Vision for Next Decade of Cleanup Progress March 31, 2016 - 12:35pm Addthis Much work remains to be done in the center of the Hanford Site, an area known as the Central Plateau, shown here in an aerial view from the east. Much work remains to be done in the center of the Hanford Site, an area known as the Central Plateau, shown here in an aerial view from the east. PHOENIX - EM's Richland

  15. Preliminary design of a fusion reactor fuel cleanup system by the palladium-alloy membrane method

    SciTech Connect (OSTI)

    Yoshida, H.; Konishi, S.; Naruse, Y.

    1983-05-01

    A design for a palladium diffuser and fuel cleanup system for a deuterium-tritium fusion reactor is proposed. The feasibility of the palladium-alloy membrane method is discussed based on early studies by the authors. Operating conditions of the palladium diffuser are determined experimentally. Dimensions of the diffuser are estimated from computer simulation. A fuel cleanup system is designed under the feed conditions of the Tritium Systems Test Assembly at Los Alamos National Laboratory. The system is composed of palladium diffusers, catalytic oxidizer, freezer, and zinc beds and has some advantages in system layout and operation. This design can readily be extended to other conditions of plasma exhaust gases.

  16. SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS

    Office of Scientific and Technical Information (OSTI)

    PRODUCTION WITH ILLINOIS COAL (Other) | SciTech Connect Other: SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS PRODUCTION WITH ILLINOIS COAL Citation Details In-Document Search Title: SUBTASK 3.12 - GASIFICATION, WARM-GAS CLEANUP, AND LIQUID FUELS PRODUCTION WITH ILLINOIS COAL The goal of this project was to evaluate the performance of Illinois No. 6 coal blended with biomass in a small-scale entrained-flow gasifier and demonstrate the production of liquid fuels under three

  17. Task 6.5 - Gas Separation and Hot-Gas Cleanup (Technical Report) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Task 6.5 - Gas Separation and Hot-Gas Cleanup Citation Details In-Document Search Title: Task 6.5 - Gas Separation and Hot-Gas Cleanup Catalytic gasification of coal to produce H{sub 2}- and CH{sub 4}-rich gases for consumption in molten carbonate fuel cells is currently under development; however, to optimize the fuel cell performance and extend its operating life, it is desired to separate as much of the inerts (i.e., CO{sub 2} and N{sub 2}) and impurities (i.e., H{sub 2}S and

  18. Task 6.5 - Gas Separation and Hot-Gas Cleanup (Technical Report) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Task 6.5 - Gas Separation and Hot-Gas Cleanup Citation Details In-Document Search Title: Task 6.5 - Gas Separation and Hot-Gas Cleanup × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this document is also available for

  19. Sandia National Laboratories: History: History Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facebook Twitter YouTube Flickr RSS About History Reports Building a Nuclear Ordnance Engineering Lab (slides from presentation to NSF Short Course "The Birthplace and Early History of the Atomic Bomb") (PPT/9 MB) Contracting in the National Interest (PDF/2 MB) Fact Sheet: A History of Exceptional Service in the National Interest (PDF/2.6 MB) A History of Building 828, Sandia National Laboratories (PDF/4 MB) Origins: The Early History of Sandia National Laboratories (PPT/8 MB) Origins

  20. National Women's History Month

    Broader source: Energy.gov [DOE]

    NATIONAL WOMEN’S HISTORY MONTH is an annual declared month that highlights the contributions of women to events in history and contemporary society.

  1. DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a contract to Enviro Compliance Solutions Inc. of Tustin, California to perform environmental sampling, monitoring services and analysis of ongoing cleanup activities being performed at the West Valley Demonstration Project in western New York.

  2. Groundwater, Legacy Soil Cleanup and Flood Recovery Top Lab’s Accomplishments

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – Top 2014 accomplishments of the Los Alamos National Laboratory’s EM-supported Environmental Programs included remediation of chromium in groundwater, completion of a legacy contaminant soil cleanup project, and rapid recovery from a 1,000-year rain event that caused widespread flooding.

  3. Idaho Site’s Cold War Cleanup Takes Center Stage in Publication

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – An association with more than 29,000 members featured an in-depth article on EM’s extensive Cold War legacy cleanup at the Idaho site in the current issue of its publication, The Military Engineer.

  4. EA-1867: Scale-up of High-Temperature Syngas Cleanup Technology, Polk County, Florida

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTIs high-temperature syngas cleanup and carbon capture and sequestration technologies.

  5. Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup Progress

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Cleanup of the Savannah River Site (SRS) is set to reach an important milestone in May with completion of the Salt Waste Processing Facility (SWPF) construction. When operational, the facility will significantly increase the amount of high-level radioactive tank waste processed and prepared for disposition.

  6. Experts Explore Opportunities to Advance Use of Robotics in EM Cleanup

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – Forty-four U.S. and international robotics experts assembled into a team by EM toured the Savannah River Site (SRS) recently to discuss how the nuclear cleanup program makes use of robotics technology across the DOE complex.

  7. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building

    Broader source: Energy.gov [DOE]

    Beta 4, one of the oldest and largest buildings at the Y-12 National Security Complex, recently reached a significant cleanup milestone. The second floor of the building, more than 82,000 square feet, has been cleared of large equipment and waste from Cold War operations.

  8. Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status Status PDF icon Status More Documents & Publications DOE O 206.2 Identity, Credential, and Access Management (ICAM) ICAM Workshop Audit Report: IG-0860

  9. File:07FDDExemptWholesaleGeneratorStatusProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    FDDExemptWholesaleGeneratorStatusProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07FDDExemptWholesaleGeneratorStatusProcess.pdf Size of this...

  10. History | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Resources » Energy Basics » History of Wind Energy History of Wind Energy Wind Program Home About the Program Research & Development WINDExchange Financial Opportunities Information Resources Publications Wind Vision Energy Basics How Wind Turbines Work How Distributed Wind Works Benefits History Wind Energy FAQs Small Wind Systems FAQs Multimedia Related Links Energy

    History of the Energy Department's Role in Nuclear Security History of the Energy Department's Role in

  11. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Wood Feedstock

    SciTech Connect (OSTI)

    Nexant Inc.

    2006-05-01

    As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for treatment of wood-derived syngas for use in the synthesis of liquid fuels. Two different 2,000 metric tonne per day gasification schemes, a low-pressure, indirect system using the gasifier, and a high-pressure, direct system using gasification technology were evaluated. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

  12. Weekly Petroleum Status Report

    Gasoline and Diesel Fuel Update (EIA)

    Please go to the redesigned Weekly Petroleum Status Report.

  13. Status of regional superfund pilots: End-of-year report

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    In 1991 and 1992, the Office of Solid Waste and Emergency Response (OSWER) began major efforts to streamline and accelerate Superfund response activities. In a statement on October 2, 1991, the USEPA Administrator approved the Superfund 30-Day Task Force Implementation Plan (October 1, 1991) which identified aggressive cleanup targets and strategies for streamlining and 'revitalizing' the Superfund process. Following this Introduction, Part II of the report contains an index of pilot activities and key contacts; Part III provides abstracts on each pilot; and Part IV describes in detail the goals of each pilot, its status, evaluation plan, and results to date.

  14. Environmental Programs: Status of Work and Current Priorities for FY13

    SciTech Connect (OSTI)

    Jones, Patricia

    2012-08-17

    Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

  15. Tevatron status

    SciTech Connect (OSTI)

    Dugan, G.

    1989-03-01

    The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

  16. US Department of Energy Environmental Cleanup Technology Development program: Business and research opportunities guide

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    The US Department of Energy (DOE) Office of Environmental Restoration and Waste Management (EM) is charged with overseeing a multi-billion dollar environmental cleanup effort. EM leads an aggressive national research, development, demonstration, testing, and evaluation program to provide environmental restoration and waste management technologies to DOE sites, and to manage DOE-generated waste. DOE is firmly committed to working with industry to effectuate this cleanup effort. We recognize that private industry, university, and other research and development programs are valuable sources of technology innovation. The primary purpose of this document is to provide you with information on potential business opportunities in the following technical program areas: Remediation of High-Level Waste Tanks; Characterization, Treatment, and Disposal of Mixed Waste; Migration of Contaminants; Containment of Existing Landfills; Decommissioning and Final Disposition, and Robotics.

  17. Cleanup Progresses at the Office of River Protection | Department of Energy

    Office of Environmental Management (EM)

    0 Cleanup Progress Report - 2010 In this issue, learn about EM's accomplishments in 2010 across the Oak Ridge Reservation. There are many more stories contained within the issue, but here are some of the highlights from each site. East Tennessee Technology Park K-25 Building West Wing Demolished Contaminated Surface Water, Groundwater at ETTP Addressed Reindustrialization Program Continues Effort to Privatize ETTP Oak Ridge National Laboratory Demolition Completed at 3026 C&D Six Facilities

  18. DOE Reaches Recovery Act Goal With Cleanup of All Legacy Transuranic Waste at Sandia National Laboratories

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M., May 3, 2012 –The U.S. Department of Energy (DOE) completed cleanup of the Cold War legacy transuranic (TRU) waste at Sandia National Laboratories (Sandia) in Albuquerque, New Mexico when four shipments of remote-handled (RH) TRU waste from Sandia arrived at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M. for permanent disposal on May 2, 2012.

  19. Cleanup Verification Package for the 118-F-3, Minor Construction Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2007-01-04

    This cleanup verification package documents completion of remedial action for the 118-F-3, Minor Construction Burial Ground waste site. This site was an open field covered with cobbles, with no vegetation growing on the surface. The site received irradiated reactor parts that were removed during conversion of the 105-F Reactor from the Liquid 3X to the Ball 3X Project safety systems and received mostly vertical safety rod thimbles and step plugs.

  20. Systems engineering functions and requirements for the Hanford cleanup mission: First issue. Addendum 3, Draft

    SciTech Connect (OSTI)

    Holmes, J.J.; Bailey, K.B.; Collings, J.L.; Hubbard, A.B.; Niepke, T.M.

    1994-05-01

    This addendum provides additional information, in the form of Functional Flow Block Diagrams (FFBD), concerning the system engineering functional analysis for the Hanford cleanup mission. Details of the mission analysis including mission statement, scope, problem statement, initial state definition, and final state definition are provided in the parent document. The results of the functional analysis as depicted in Integrated Definition language notation (IDEFO) diagrams are provided in Addendum 2 to the parent document. The FFBDs provided herein cover the total Hanford cleanup mission and depict the decomposition of functions to a reasonable level for understanding (generally level 3 or 4). Functional definitions are contained in Section 3.0 of Addendum 2 to the parent document. Specific programs such as the Tank Waste Remediation System and Environmental Restoration, whose IDEFO diagrams were presented as part of their specific baseline documentation and not included in Addendum 2, have their FFBDs included in this addendum. The information contained in this addendum will remain tied to the overall Hanford cleanup mission through the top-level (``Capstone``) functional analysis so that a complete, top-to-bottom functional documentation set always exists for all mission activities. This linkage is accomplished through the use of the Requirements Driven Design (RDD-100{reg_sign}) design tool. Through the use of RDD-100{reg_sign}, this addendum supports and is traceable to the information presented in Addendum 2 to the parent document.

  1. LANSCE | About | History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History The History of LANSCE Since 1972, the 800-million-electron-volt (MeV) accelerator and its attendant facilities at Technical Area 53 (TA-53, often referred to as "the Mesa")...

  2. National Women's History Month

    Broader source: Energy.gov [DOE]

    During Women's History Month, we recall that the pioneering legacy of our grandmothers and great-grandmothers is revealed not only in our museums and history books, but also in the fierce...

  3. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History History On January 7, 2011, the President signed H.R. 6523 (111th), the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (http:www.govtrack.us...

  4. HISTORY OF BUILDING 828

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1997); and for a summary of the early history of Kirtland Air Force Base, see Don E. Alberts and Allan E. Putnam, A History of Kirtland Air Force Base 1928-1982 (Albuquerque:...

  5. History of Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Publications History Publications History Publications Since its establishment in 1957, the Office of History and Heritage Resources (OHHR) has consistently sought to maintain a level of excellence in its publications that meets all scholarly standards and yet is accessible to the general public. At the same time, OHHR has partnered with DOE program offices and field sites to provide historical products that are useful and fill specific departmental needs. In this effort, OHHR has

  6. BLACK HISTORY MONTH

    Broader source: Energy.gov [DOE]

    Black History Month is an annual celebration of achievements by black Americans and a time for recognizing the central role of African Americans in U.S. history. The event grew out of “Negro History Week,” created by historian Carter G. Woodson and other prominent African Americans. Other countries around the world, including Canada and the United Kingdom, also devote a month to celebrating black history.

  7. History of Wind Energy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History of Wind Energy History of Wind Energy

  8. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    status NIF Status Update - 2014 May - Highlights of May Experiments on NIF Gigabar Equation-of-State Experiments Production of Beryllium Capsules for NIF Begins First Weekly...

  9. Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

    SciTech Connect (OSTI)

    Schubert, A.L.

    2013-07-01

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

  10. Cleanup 101

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | National Nuclear Security Administration Cleantech Open meets with Lawrence Livermore, Sandia national laboratories Wednesday, March 26, 2014 - 10:00am The Cleantech Open, the world's largest accelerator for clean technology start ups, hosted a regional networking event last week to discuss the challenges and opportunities for investors and entrepreneurs to do business with Lawrence Livermore and Sandia national laboratories. Cleantech Open meets with Lawrence Livermore, Sandia national

  11. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Energy.gov » History History What's New in History November 11-12, 2015: Opening the Manhattan Project National Historical Park November 11-12, 2015: Opening the Manhattan Project National Historical Park Oak Ridge, Hanford, and Los Alamos communities hold celebrations to mark the opening of the new park. The National Park Service launches its Manhattan Project National Historical park visitors page. Read more November 10, 2015: K-25 Virtual Museum Launched November 10, 2015: K-25 Virtual

  12. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Us » History History The following is a short history recounting the evolution of the project management office within the Department of Energy: The project management office was originally called the Office of Field Management (FM) and was under the purview of the Office of the Chief Financial Officer in the 1990s. In the fiscal year 2000 Energy & Water Development Appropriations, the Senate initiated and the House concurred to eliminate funding for DOE's Office of Field Management.

  13. West Valley Demonstration Project: A Short History and Status | Department

    Office of Environmental Management (EM)

    Project West Valley Demonstration Project West Valley Demonstration Project compliance agreements, along with summaries of the agreements, can be viewed here. PDF icon West Valley Demonstration Project Administrative Consent Order, August 27, 1996 PDF icon West Valley Demonstration Project Administrative Consent Order, August 27, 1996 Summary PDF icon West Valley Demonstration Project Administrative Consent Order, March 5, 1992 PDF icon West Valley Demonstration Project Administrative Consent

  14. ARM - History and Status of the ARM Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    broadened beyond radiative transfer to include clouds and cloud processes represented in general circulation models, a change deemed necessary to adequately address those...

  15. PIT 9: From "Black Eye" to Part of DOE Cleanup Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PIT 9: From "Black Eye" to Part of DOE Cleanup Success There was a time back in the late 1990s and early 2000s when the words "Pit 9" were synonymous with failure. Failure on the part of a large company to execute its contract to clean up Pit 9. Failure on the part of the Federal government to meet the deadlines to clean up nuclear waste. And failure of a new approach to government contracting - "privatization" - that was supposed to make contractors more

  16. The Department of Energy Announces Major Cold War Legacy Waste Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Milestone Media Contact: (208) 586-4940 For Immediate Release: September 28, 2011 The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone Waste Isolation Pilot Plant Receives 10,000th Shipment CARLSBAD, NM - The U.S. Department of Energy today announced that the Waste Isolation Pilot Plant (WIPP) received its 10,000th shipment of transuranic (TRU) waste over the weekend. This marks an important milestone in DOE�s mission to clean up the country�s Cold War

  17. The Hanford Advisory Board (HAB or Board) welcomes public comment on cleanup of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB or Board) welcomes public comment on cleanup of the Hanford Site. Those wishing to make public comment during the meeting should sign in and notify the Board's administrator (at the back of the room). The chair will be notified of the request and will ask for public comment at the conclusion of the next agenda item. Hanford Advisory Board April Agenda FINAL- Page 1/ 4 Hanford Advisory Board April 13-14, 2016 Location: Columbia/Benton Franklin Room, Red Lion Hanford House, 802 George

  18. EM's West Valley Cleanup Contactor Receives 85 Percent of Available Fee

    Office of Environmental Management (EM)

    Rolls Out Fiscal Year 2014 Budget Request EM Rolls Out Fiscal Year 2014 Budget Request April 10, 2013 - 12:00pm Addthis WASHINGTON, D.C. - Today EM Senior Advisor David Huizenga rolled out a $5.622 billion budget request for fiscal year 2014 that enables EM progress in all areas of the nuclear cleanup program while maintaining safety and compliance across the complex. "The President's Fiscal Year 2014 Budget Request of $5.622 billion provides the resources to clean up the Cold War legacy

  19. Superfund at work: Hazardous waste cleanup efforts nationwide, Spring 1993 (Powersville site profile, Peach County, Georgia)

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The US Environmental Protection Agency (EPA) encountered much more than a municipal landfill at the Powersville site in Peach County, Georgia. Contamination from improperly dumped hazardous wastes and pesticides tainted an old quarry used for household garbage. Chemicals migrating into area ground water threatened local drinking water supplies. To address these issues, EPA's Superfund program designed a cleanup strategy that included: negotiating with the county and chemical companies to contain the hazardous wastes on site underneath a protective cover; investigating reports of drinking water contamination and extending municipal water lines to affected residents; and conducting a tailored community relations program to inform and educate residents about the site.

  20. FLUOR HANFORD (FH) MAKES CLEANUP A REALITY IN NEARLY 11 YEARS AT HANFORD

    SciTech Connect (OSTI)

    GERBER, M.S.

    2007-05-24

    For nearly 11 years, Fluor Hanford has been busy cleaning up the legacy of nuclear weapons production at one of the Department of Energy's (DOE'S) major sites in the United States. As prime nuclear waste cleanup contractor at the vast Hanford Site in southeastern Washington state, Fluor Hanford has changed the face of cleanup. Fluor beginning on October 1, 1996, Hanford Site cleanup was primarily a ''paper exercise.'' The Tri-Party Agreement, officially called the Hanford Federal Facility Agreement and Consent Order - the edict governing cleanup among the DOE, U.S. Environmental Protection Agency (EPA) and Washington state - was just seven years old. Milestones mandated in the agreement up until then had required mainly waste characterization, reporting, and planning, with actual waste remediation activities off in the future. Real work, accessing waste ''in the field'' - or more literally in huge underground tanks, decaying spent fuel POO{approx}{approx}S, groundwater, hundreds of contaminated facilities, solid waste burial grounds, and liquid waste disposal sites -began in earnest under Fluor Hanford. The fruits of labors initiated, completed and/or underway by Fluor Hanford can today be seen across the site. Spent nuclear fuel is buttoned up in secure, dry containers stored away from regional water resources, reactive plutonium scraps are packaged in approved containers, transuranic (TRU) solid waste is being retrieved from burial trenches and shipped offsite for permanent disposal, contaminated facilities are being demolished, contaminated groundwater is being pumped out of aquifers at record rates, and many other inventive solutions are being applied to Hanford's most intransigent nuclear wastes. (TRU) waste contains more than 100 nanocuries per gram, and contains isotopes higher than uranium on the Periodic Table of the Elements. (A nanocurie is one-billionth of a curie.) At the same time, Fluor Hanford has dramatically improved safety records, and cost effectively maintained and streamlined infrastructure and equipment that is impossibly old and in many cases ''extinct'' in terms of spare parts and vendor support. The story of Fluor's achievements at the Hanford Site - the oldest and most productive plutonium site in the world - is both inspiring and instructive.

  1. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect (OSTI)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  2. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago

    Office of Environmental Management (EM)

    October 6, 2011 Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago IDAHO FALLS, Idaho - From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first

  3. Agencies sign last record of decision for DOE Idaho cleanup program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agencies sign last record of decision for DOE Idaho cleanup program The U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency and the State of Idaho have signed the last of 25 Superfund records of decision (RODs) at DOE�s Idaho Site. These three agencies have been implementing an agreement to clean up the 890 square-mile, eastern Idaho site since 1991. Last year, the agencies completed a multi-year environmental study of the Snake River Plain Aquifer beneath the site

  4. Energy/Water History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion ...

  5. Continuing Clean-up at Oak Ridge, Portsmouth and Paducah-Successes and Near-Term Plans

    SciTech Connect (OSTI)

    Fritz, L. L.; Houser, S. M.; Starling, D. A.

    2002-02-26

    This paper describes the complexities and challenges associated with the Oak Ridge Environmental Management (EM) cleanup program and the steps that DOE and Bechtel Jacobs Company LLC (the Oak Ridge EM team) have collaboratively taken to make significant physical progress and get the job done. Maintaining significant environmental cleanup progress is a daunting challenge for the Oak Ridge EM Team. The scale and span of the Oak Ridge Operations (ORO) cleanup is immense-five major half-century-old installations in three states (three installations are complete gaseous diffusion plants), with concurrent cleanup at the fully operational Oak Ridge National Laboratory and Y-12 National Security Complex, and with regulatory oversight from three states and two United States (US) Environmental Protection Agency (EPA) Regions. Potential distractions arising from funding fluctuations and color-of-money constraints, regulatory negotiations, stakeholder issues, or any one of a number of other potential delay phenomena can not reduce the focus on safely achieving project objectives to maintain cleanup momentum.

  6. Microscale acceleration history discriminators

    DOE Patents [OSTI]

    Polosky, Marc A.; Plummer, David W.

    2002-01-01

    A new class of micromechanical acceleration history discriminators is claimed. These discriminators allow the precise differentiation of a wide range of acceleration-time histories, thereby allowing adaptive events to be triggered in response to the severity (or lack thereof) of an external environment. Such devices have applications in airbag activation, and other safety and surety applications.

  7. They all like it hot: faster cleanup of contaminated soil and groundwater

    SciTech Connect (OSTI)

    Newmark, R., LLNL

    1998-03-01

    Clean up a greasy kitchen spill with cold water and the going is slow. Us hot water instead and progress improves markedly. So it makes sense that cleanup of greasy underground contaminants such as gasoline might go faster if hot water or steam were somehow added to the process. The Environmental Protection Agency named hundreds of sites to the Superfund list - sites that have been contaminated with petroleum products or petroleum products or solvents. Elsewhere across the country, thousands of properties not identified on federal cleanup lists are contaminated as well. Given that under current regulations, underground accumulations of solvent and hydrocarbon contaminants (the most serious cause of groundwater pollution) must be cleaned up, finding a rapid and effective method of removing them is imperative. In the early 1990`s, in collaboration with the School of Engineering at the University of California at Berkeley, Lawrence Livermore developed dynamic underground stripping. This method for treating underground contaminants with heat is much faster and more effective than traditional treatment methods.

  8. Public agency partnership: Hanford`s history artifacts as a communications tool

    SciTech Connect (OSTI)

    Gerber, M.S.

    1994-02-01

    The Hanford Site in eastern Washington state currently is engaged in the largest waste cleanup in world history. In order to make informed decisions about remediation options, the public throughout the Pacific Northwest and the nation needs to understand the wastes that are present, their sources of generation, their composition, and their behavior in the environment. The fact that Hanford operations` were conducted in secret for over four decades presents a unique public information challenge to those who currently are responsible for communicating with the public.

  9. Turning the Corner on Hanford Tank Waste Cleanup from Safe Storage to Closure

    SciTech Connect (OSTI)

    CRUZ, E.J.; BOSTON, H.L.

    2002-02-04

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) is leading the River Protection Project (RPP) which is responsible for the disposition of 204,000 cubic meters (54 million gallons) of high-level radioactive waste that have accumulated in large underground tanks at the Hanford Site since 1944. ORP continues to make good progress on improving the capability to treat Hanford tank waste. Design of the waste vitrification facilities is proceeding well and construction will begin within the next year. Progress is also being made in reducing risk to the worker and the environment from the waste currently stored in the tank farms. Removal of liquids from single-shell tanks (SSTs) is on schedule and we will begin removing solids (salt cake) from a tank (241-U-107) in 2002. There is a sound technical foundation for the waste vitrification facilities. These initial facilities will be capable of treating (vitrifying) the bulk of Hanford tank waste and are the cornerstone of the clean-up strategy. ORP recognizes that as the near-term work is performed, it is vital that there be an equally strong and defensible plan for completing the mission. ORP is proceeding on a three-pronged approach for moving the mission forward. First, ORP will continue to work aggressively to complete the waste vitrification facilities. ORP intends to provide the most capable and robust facilities to maximize the amount of waste treated by these Initial facilities by 2028 (regulatory commitment for completion of waste treatment). Second, and in parallel with completing the waste vitrification facilities, ORP is beginning to consider how best to match the hazard of the waste to the disposal strategy. The final piece of our strategy is to continue to move forward with actions to reduce risk in the tank farms and complete cleanup. The goal of these efforts is to keep the RPP on a success path for completing cleanup of Hanford tank waste. While all parties are aggressively moving forward to provide vitrification facilities with enhanced capabilities, work continues toward a credible plan for completing waste treatment and accelerating risk reduction. In all of these efforts two principles are paramount; (1) all actions are focused on protecting worker health and the environment and complying with laws and regulations, and (2) open discussion, involvement, and cooperation of regulators and stakeholders is fundamental to any decision making.

  10. Options To Cleanup Site-wide Vadose Zone Contamination At The Hanford Site, WA, State

    SciTech Connect (OSTI)

    Goswami, D. [Ph.D, and John Price, Nuclear Waste Program, Washington State Department of Ecology, Richland, WA (United States)

    2008-07-01

    The U.S. Department of Energy (DOE) Hanford Site in south central Washington State lies along the Columbia River and is one of DOE's largest legacy waste management sites. Enormous radionuclide and chemical inventories exist below-ground. These include Resource Conservation and Recovery Act (RCRA) storage facilities where hazardous and radioactive contaminants were discharged and leaked to the soil surface and to the deep vadose zone and groundwater. The vadose zone is also contaminated from facilities regulated by the RCRA and Comprehensive Environmental Response Compensation and Liability Act (CERCLA) Act. Hanford now contains as much as 28,300 cubic meters of soil contaminated with radionuclides from liquid wastes released near processing facilities. The Hanford Federal Facility Agreement and Consent Order, Tri-Party Agreement (TPA) has set the completion of the cleanup of these sites by 2024. There are numerous technical and regulatory challenges to cleanup of the vadose zone at the Hanford site. This paper attempts to identify the categories of deep vadose zone problem and identifies a few possible regulatory options to clean up the site under the mix of state and federal regulatory authorities. There are four major categories of vadose contamination areas at the Hanford Site. The first is laterally extensive with intermediate depth (ground surface to about 45 meters depth) mostly related to high volume effluent discharge into cribs, ponds and ditches of designated CERCLA facilities. The second is dominated by laterally less extensive mostly related to leaks from RCRA tank farms. The later contamination is often commingled at depth with wastes from adjacent CERCLA facilities. The third category is from the high volume CERCLA facilities extending from the surface to more than 60 meters below ground. Contamination from the later category crosses the entire thickness of the vadose zone and reached groundwater. The fourth category is the lower volume waste sites. There are multiple management options to clean up the above four categories of vadose zones sites. The following are some of the options considered for detailed evaluation: - Maintain separate decision processes for each RCRA and CERCLA units/waste sites with a more accommodating schedule. - Create new vadose zone operable units with limited geographical boundaries regardless of site category/origin and make an integrated decision. - Expand the existing CERCLA groundwater operable units to include the deep vadose zone - Use a combination of the above. Each option has pros and cons and regulatory limitations. Detailed evaluation of these options is required to support a cost effective expedited cleanup. (authors)

  11. 2003 U.S. Department of Energy Strategic Plan: Protecting National, Energy, and Economic Security with Advanced Science and Technology and Ensuring Environmental Cleanup

    SciTech Connect (OSTI)

    None,

    2003-09-30

    The Department of Energy contributes to the future of the Nation by ensuring energy security, maintaining the safety, security and reliability of the nuclear weapons stockpile, cleaning up the environment from the legacy of the Cold War, and developing innovations in science and technology. After 25 years in existence, the Department now operates 24 preeminent research laboratories and facilities and four power marketing administrations, and manages the environmental cleanup from 50 years of nuclear defense activities that impacted two million acres in communities across the country. The Department has an annual budget of about $23 billion and employs about 14,500 Federal and 100,000 contractor employees. The Department of Energy is principally a national security agency and all of its missions flow from this core mission to support national security. That is true not just today, but throughout the history of the agency. The origins of the Department can be traced to the Manhattan Project and the race to develop the atomic bomb during World War II. Following the war, Congress engaged in a vigorous and contentious debate over civilian versus military control of the atom. The Atomic Energy Act of 1946 settled the debate by creating the Atomic Energy Commission, which took over the Manhattan Project’s sprawling scientific and industrial complex.

  12. Departmental History Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-03-26

    The order describes the DOE history program and establishes policy and objectives for the preservation of historical records and institutional memory for DOE and its predecessor agencies. Cancels DOE 1324.7.

  13. Black History Month

    Broader source: Energy.gov [DOE]

    During National African American History Month, we pay tribute to the contributions of past generations and reaffirm our commitment to keeping the American dream alive for the next generation.  In...

  14. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History History The Better Buildings Neighborhood Program was first announced by Vice President Biden as "Retrofit Ramp-Up" on April 21, 2010. The program presented initial awards of $452 million in American Recovery and Reinvestment Act (ARRA or Recovery Act) funding to 25 state and local governments to "ramp up" energy efficiency building retrofits. The Better Buildings Neighborhood Program then distributed a total of $508 million to support hundreds of communities served

  15. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the SunShot Initiative » History History This timeline features the key innovations that have advanced the solar industry in the United States. Learn more about these key events from 1955 to present. To see more details, either drag the timeline to the left or right or click the (+) icons. Solar Achievements Timeline INSTRUCTIONS Instructional graphic for mouse use. Click and drag screen or scroll mouse wheel to navigate through timeline. 2011 INDUSTRY Graphic of the U.S. Department of

  16. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History History 2016 JANUARY Driving Economic Growth: Advanced Technology Vehicles Manufacturing report released 2015 DECEMBER Financing Innovation to Address Climate Change report released Desert Sunlight awarded Top Plant (Renewables) - POWER Magazine JULY Mark McCall hired as Executive Director, Loan Programs Office JUNE Loan guarantees issued for Vogtle (MEAG Power) MARCH Conditional commitment for ATVM loan offered to Alcoa FEBRUARY Powering New Markets: Utility-scale Photovoltaic Solar

  17. An innovative approach to multimedia waste reduction measuring performance for environmental cleanup programs

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.

    1993-05-01

    One of the greatest challenges we now face in environmental clean up is measuring the progress of minimizing multimedia transfer releases and achieving waste reduction. Briefly, multimedia transfer refers to the air, land, and water where pollution is not just controlled, concentrated, and moved from one media to another. An example of multimedia transfer would be heavy metals in waste water sludges moved from water to land disposal. Over two billion dollars has been budgeted for environmental restoration site cleanups by the Department of Energy for fiscal year 1994. Unless we reduce the huge waste volumes projected to be generated in the near future, then we will devote more and more resources to manage and dispose of these wastes.

  18. Environmental cleanup privatization, products and services directory, January 1997. Second edition

    SciTech Connect (OSTI)

    1997-01-01

    The US Department of Energy has undertaken an ambitious ``Ten Year Plan`` for the Weapons Complex, an initiative to complete cleanup at most nuclear sites within a decade. This Second Edition of the Directory is designed to facilitate privatization which is key to the success of the Plan. The Directory is patterned after the telephone Yellow Pages. Like the Yellow Pages, it provides the user with points of contact for inquiring further into the capabilities of the listed companies. This edition retains the original format of three major sections under the broad headings: Treatment, Characterization, and Extraction/Deliver/Materials Handling. Within each section, companies are listed alphabetically. Also, ``company name`` and ``process type`` indices are provided at the beginning of each section to allow the user quick access to listings of particular interest.

  19. Characterization, minimization and disposal of radioactive, hazardous, and mixed wastes during cleanup and rransition of the Tritium Research Laboratory (TRL) at Sandia National Laboratories/California (SNL/CA)

    SciTech Connect (OSTI)

    Garcia, T.B.; Gorman, T.P.

    1996-12-01

    This document provides an outline of waste handling practices used during the Sandia National Laboratory/California (SNL/CA), Tritium Research Laboratory (TRL) Cleanup and Transition project. Here we provide background information concerning the history of the TRL and the types of operations that generated the waste. Listed are applicable SNL/CA site-wide and TRL local waste handling related procedures. We describe personnel training practices and outline methods of handling and disposal of compactible and non-compactible low level waste, solidified waste water, hazardous wastes and mixed wastes. Waste minimization, reapplication and recycling practices are discussed. Finally, we provide a description of the process followed to remove the highly contaminated decontamination systems. This document is intended as both a historical record and as a reference to other facilities who may be involved in similar work.

  20. Cooperative Agreement Awarded to Energy Communities Alliance to Assist DOE Interface with Local Governments on Cleanup Missions

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a $3.1 million, five-year cooperative agreement to the Energy Communities Alliance (ECA), of Washington, D.C. to continue collaborate efforts between DOE and local governments to solve challenges posed by the Office of Environmental Management’s nuclear waste management, changing DOE missions and ongoing cleanup at DOE sites.

  1. DOE’s Second National Cleanup Workshop Set for Sept. 14-15 in the Washington, D.C. Area

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE, in cooperation with the Energy Communities Alliance and Energy Facility Contractors Group, is set to hold the second DOE National Cleanup Workshop on Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va.

  2. Turning the Corner on Hanford Tank Waste Cleanup-From Safe Storage to Closure

    SciTech Connect (OSTI)

    Boston, H. L.; Cruz, E. J.; Coleman, S. J.

    2002-02-25

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) is leading the River Protection Project (RPP) which is responsible for the disposition of 204,000 cubic meters (54 million gallons) of high-level radioactive waste that have accumulated in large underground tanks at the Hanford Site since 1944. ORP continues to make good progress on improving the capability to treat Hanford tank waste. Design of the waste vitrification facilities is proceeding well and construction will begin within the next year. Progress is also being made in reducing risk to the worker and the environment from the waste currently stored in the tank farms. Removal of liquids from single-shell tanks (SSTs) is on schedule and we will begin removing solids (salt cake) from a tank (241-U-107) in 2002. There is a sound technical foundation for the waste vitrification facilities. These initial facilities will be capable of treating (vitrifying) the bulk of Hanford tank waste and are the corners tone of the clean-up strategy. ORP recognizes that as the near-term work is performed, it is vital that there be an equally strong and defensible plan for completing the mission. ORP is proceeding on a three-pronged approach for moving the mission forward. First, ORP will continue to work aggressively to complete the waste vitrification facilities. ORP intends to provide the most capable and robust facilities to maximize the amount of waste treated by these initial facilities by 2028 (regulatory commitment for completion of waste treatment). Second, and in parallel with completing the waste vitrification facilities, ORP is beginning to consider how best to match the hazard of the waste to the disposal strategy. The final piece of our strategy is to continue to move forward with actions to reduce risk in the tank farms and complete cleanup.

  3. An innovative approach to multimedia waste reduction: Measuring performance for environmental cleanup projects

    SciTech Connect (OSTI)

    Phifer, B.E. Jr.; George, S.M.

    1993-04-01

    One of the greatest challenges we now face in environmental cleanup is measuring the progress of minimizing multimedia transfer releases and achieving waste reduction. Briefly, multimedia transfer refers to the air, land, and water where pollution is not controlled, concentrated, and moved from one medium to another. An example of multimedia transfer would be heavy metals in wastewater sludges moved from water to land disposal. Over $2 billion has been budgeted for environmental restoration site cleanups by the Department of Energy (DOE) for FY 1994. Unless we reduce the huge waste volumes projected to be generated in the near future, then we will devote more and more resources to the management and disposal of these wastes. To meet this challenge, the Martin Marietta Energy Systems, Inc., Oak Ridge Environmental Restoration (ER) Program has explored the value of a multimedia approach by designing an innovative Pollution Prevention Life-Cycle Model. The model consists of several fundamental elements (Fig. 1) and addresses the two major objectives of data gathering and establishing performance measures. Because the majority of projects are in the remedial investigation phase, the focus is on the prevention of unnecessary generation of investigation-derived waste and multimedia transfers at the source. A state-of-the-art tool developed to support the life-cycle model for meeting these objectives is the Numerical Scoring System (NSS), which is a computerized, user-friendly data base system for information management, designed to measure the effectiveness of pollution prevention activities in each phase of the ER Program. This report contains a discussion of the development of the Pollution Prevention Life-Cycle Model and the role the NSS will play in the pollution prevention programs in the remedial investigation phase of the ER Program at facilities managed by Energy Systems for DOE.

  4. Issues in UK cleanup and decommissioning; a strategic R and D programme

    SciTech Connect (OSTI)

    Tinsley, T.P.; Ashley, V.B.; Morgan, H.G.; Fairhall, G.A.

    2008-07-01

    Nexia Solutions is contracted to manage and carry out research on behalf of the Nuclear Decommissioning Authority (NDA). This paper will describe the nuclear research ongoing and how it fits in with the UK cleanup and decommissioning strategy. The aim of the strategic R and D programme is to assist the NDA in maintaining a technical portfolio which will:- - identify and address challenges and clean-up problems that do not have an existing solution; - resolve potential inconsistencies between sites in the technical bases for certain strategic decisions and their implementation; - maintain options while developing strategy (emerging risks); - save costs by developing multi-site solutions; - provide technology, skills and facilities on the timescale required. The strategy for the R and D programme has been developed from a top-level approach by understanding the challenges which need to be addressed and prioritising these according to the objectives of the programme. The programme has demonstrated that a technical portfolio comprising six areas, each containing a number of key themes, is appropriate to address the technical challenges which the NDA faces and aligns with the NDA's technical issues register. An important aspect of the R and D programme is that it should create opportunities for undertaking the NDA mission more effectively. This arises from the emphasis given in those technical programmes which define the challenge more precisely and thus provide a platform from which to produce innovative solutions. The paper will present an overview of the strategic R and D programme along with the key technical programme areas. Examples will be provided of the technical work ongoing, and the results obtained so far. (author)

  5. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Carver Email Announcements Archive An archive of email announcements sent to NERSC users regarding Carver. Read More » Timeline Timeline of significant Carver events. Read More » Last edited: 2016-04-29 11:34:35

  6. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Announcements All recent NERSC announcements affecting Euclid. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Euclid. Read More » Known Problems All known current problems with Euclid. Read More » Timeline Timeline of significant Euclid events. Read More » Last edited: 2016-04-29 11:34:40

  7. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History History Although they are tiny, atoms have a large amount of energy holding their nuclei together. Certain isotopes of some elements can be split and will release part of their energy as heat. This splitting is called fission. The heat released in fission can be used to help generate electricity in powerplants. Uranium-235 (U-235) is one of the isotopes that fissions easily. During fission, U-235 atoms absorb loose neutrons. This causes U-235 to become unstable and split into two light

  8. History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History History The U. S. Army Corps of Engineers began acquiring land, in the area that became Oak Ridge, in October 1942 for the Manhattan Project. By March 1943, 56,000 acres were sealed behind fences and major industrial facilities were under construction. The K-25, S-50, and Y-12 plants were all built to separate the fissile isotope uranium-235 from uranium-238, while the X-10 site was established as a pilot plant for the Graphite Reactor. Throughout the next six decades the three major

  9. Quantum histories without contrary inferences

    SciTech Connect (OSTI)

    Losada, Marcelo; Laura, Roberto

    2014-12-15

    In the consistent histories formulation of quantum theory it was shown that it is possible to retrodict contrary properties. We show that this problem do not appear in our formalism of generalized contexts for quantum histories. - Highlights: We prove ordinary quantum mechanics has no contrary properties. Contrary properties in consistent histories are reviewed. We prove generalized contexts for quantum histories have no contrary properties.

  10. The Safety and Tritium Applied Research (STAR) Facility: Status-2004

    SciTech Connect (OSTI)

    Anderl, R.A.; Longhurst, G.R.; Pawelko, R.J.; Sharpe, J.P.; Schuetz, S.T.; Petti, D.A.

    2005-07-15

    The Safety and Tritium Applied Research (STAR) Facility, a US DOE National User Facility at the Idaho National Engineering and Environmental Laboratory (INEEL), comprises capabilities and infrastructure to support both tritium and non-tritium research activities important to the development of safe and environmentally friendly fusion energy. Research thrusts include (1) interactions of tritium and deuterium with plasma-facing-component (PFC) materials, (2) fusion safety issues [PFC material chemical reactivity and dust/debris generation, activation product mobilization, tritium behavior in fusion systems], and (3) molten salts and fusion liquids for tritium breeder and coolant applications. This paper updates the status of STAR and the capabilities for ongoing research activities, with an emphasis on the development, testing and integration of the infrastructure to support tritium research activities. Key elements of this infrastructure include a tritium storage and assay system, a tritium cleanup system to process glovebox and experiment tritiated effluent gases, and facility tritium monitoring systems.

  11. History of Air Conditioning

    Broader source: Energy.gov [DOE]

    We take it for granted but what would life be like without the air conditioner? Once considered a luxury, this invention is now an essential, allowing us to cool everything from homes, businesses, businesses, data centers, laboratories and other buildings vital to our daily lives. Explore this timeline to learn some of the key dates in the history of air conditioning.

  12. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2.3: Sulfur Primer

    SciTech Connect (OSTI)

    Nexant Inc.

    2006-05-01

    This deliverable is Subtask 2.3 of Task 2, Gas Cleanup Design and Cost Estimates, of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 2.3 builds upon the sulfur removal information first presented in Subtask 2.1, Gas Cleanup Technologies for Biomass Gasification by adding additional information on the commercial applications, manufacturers, environmental footprint, and technical specifications for sulfur removal technologies. The data was obtained from Nexant's experience, input from GTI and other vendors, past and current facility data, and existing literature.

  13. Method of and apparatus for preheating pressurized fluidized bed combustor and clean-up subsystem of a gas turbine power plant

    DOE Patents [OSTI]

    Cole, Rossa W.; Zoll, August H.

    1982-01-01

    In a gas turbine power plant having a pressurized fluidized bed combustor, gas turbine-air compressor subsystem and a gas clean-up subsystem interconnected for fluid flow therethrough, a pipe communicating the outlet of the compressor of the gas turbine-air compressor subsystem with the interior of the pressurized fluidized bed combustor and the gas clean-up subsystem to provide for flow of compressed air, heated by the heat of compression, therethrough. The pressurized fluidized bed combustor and gas clean-up subsystem are vented to atmosphere so that the heated compressed air flows therethrough and loses heat to the interior of those components before passing to the atmosphere.

  14. Terminating Safeguards on Excess Special Nuclear Material: Defense TRU Waste Clean-up and Nonproliferation - 12426

    SciTech Connect (OSTI)

    Hayes, Timothy; Nelson, Roger

    2012-07-01

    The Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) manages defense nuclear material that has been determined to be excess to programmatic needs and declared waste. When these wastes contain plutonium, they almost always meet the definition of defense transuranic (TRU) waste and are thus eligible for disposal at the Waste Isolation Pilot Plant (WIPP). The DOE operates the WIPP in a manner that physical protections for attractiveness level D or higher special nuclear material (SNM) are not the normal operating condition. Therefore, there is currently a requirement to terminate safeguards before disposal of these wastes at the WIPP. Presented are the processes used to terminate safeguards, lessons learned during the termination process, and how these approaches might be useful for future defense TRU waste needing safeguards termination prior to shipment and disposal at the WIPP. Also described is a new criticality control container, which will increase the amount of fissile material that can be loaded per container, and how it will save significant taxpayer dollars. Retrieval, compliant packaging and shipment of retrievably stored legacy TRU waste has dominated disposal operations at WIPP since it began operations 12 years ago. But because most of this legacy waste has successfully been emplaced in WIPP, the TRU waste clean-up focus is turning to newly-generated TRU materials. A major component will be transuranic SNM, currently managed in safeguards-protected vaults around the weapons complex. As DOE and NNSA continue to consolidate and shrink the weapons complex footprint, it is expected that significant quantities of transuranic SNM will be declared surplus to the nation's needs. Safeguards termination of SNM varies due to the wide range of attractiveness level of the potential material that may be directly discarded as waste. To enhance the efficiency of shipping waste with high TRU fissile content to WIPP, DOE designed an over-pack container, similar to the pipe component, called the criticality control over-pack, which will significantly enhance the efficiency of disposal. Hundreds of shipments of transuranic SNM, suitably packaged to meet WIPP waste acceptance criteria and with safeguards terminated have been successfully emplaced at WIPP (primarily from the Rocky Flats site clean-up) since WIPP opened. DOE expects that thousands more may eventually result from SNM consolidation efforts throughout the weapons complex. (authors)

  15. Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives, Railcars

    Broader source: Energy.gov [DOE]

    With the help of the American Recovery and Reinvestment Act, the Hanford Site is preserving the history of its locomotives and railcars as workers clean up the legacy of the Cold War.

  16. Savannah River Site Basin Cleanup Comes Full Circle to Los Angeles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sun-blocking options. But the rhombus-shaped balls were the most cost effective and had a history of success in other water bodies in the U.S. What is unique to the rhombus-shaped...

  17. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up See the MOTD for live up to date information on NERSC systems Open Issues List of known problems and key issues we are actively working on. Read More » Genepool Featured Announcements A list of key Genepool announcements and system changes. Read More » Genepool Email Announcements Archive An archive of email announcements sent to NERSC users regarding Genepool. Read More » Announcements Move data from /projectb/projectdirs 5 March 2014, 3:13 pm

  18. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Retired on April 30, 2012 Announcements A list of key Franklin announcements and system changes. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Franklin. Read More » Franklin Timeline This page records a brief timeline of significant events and user environment changes on Franklin. Read More » Last edited: 2016-04-29 11:34:24

  19. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled

  20. Prospects for pyrolysis technologies in managing municipal, industrial, and DOE cleanup wastes

    SciTech Connect (OSTI)

    Reaven, S.J.

    1994-12-01

    Pyrolysis converts portions of municipal solid wastes, hazardous wastes, and special wastes such as tires, medical wastes, and even old landfills into solid carbon and a liquid or gaseous hydrocarbon stream. Pyrolysis heats a carbonaceous waste stream typically to 290--900 C in the absence of oxygen, and reduces the volume of waste by 90% and its weight by 75%. The solid carbon char has existing markets as an ingredient in many manufactured goods, and as an adsorbent or filter to sequester certain hazardous wastes. Pyrolytic gases may be burned as fuel by utilities, or liquefied for use as chemical feedstocks, or low-pollution motor vehicle fuels and fuel additives. This report analyzes the potential applications of pyrolysis in the Long Island region and evaluates for the four most promising pyrolytic systems their technological and commercial readiness, their applicability to regional waste management needs, and their conformity with DOE requirements for environmental restoration and waste management. This summary characterizes their engineering performance, environmental effects, costs, product applications, and markets. Because it can effectively treat those wastes that are inadequately addressed by current systems, pyrolysis can play an important complementing role in the region`s existing waste management strategy. Its role could be even more significant if the region moves away from existing commitments to incineration and MSW composting. Either way, Long Island could become the center for a pyrolysis-based recovery services industry serving global markets in municipal solid waste treatment and hazardous waste cleanup. 162 refs.

  1. Critically safe vacuum pickup for use in wet or dry cleanup of radioactive materials

    DOE Patents [OSTI]

    Zeren, Joseph D.

    1994-01-01

    A vacuum pickup of critically safe quantity and geometric shape is used in cleanup of radioactive materials. Collected radioactive material is accumulated in four vertical, parallel, equally spaced canisters arranged in a cylinder configuration. Each canister contains a filter bag. An upper intake manifold includes four 90 degree spaced, downward facing nipples. Each nipple communicates with the top of a canister. The bottom of each canister communicates with an exhaust manifold comprising four radially extending tubes that meet at the bottom of a centrally located vertical cylinder. The top of the central cylinder terminates at a motor/fan power head. A removable HEPA filter is located intermediate the top of the central cylinder and the power head. Four horizontal bypass tubes connect the top of the central cylinder to the top of each of the canisters. Air enters the vacuum cleaner via a hose connected to the intake manifold. Air then travels down the canisters, where particulate material is accumulated in generally equal quantities in each filter bag. Four air paths of bag filtered air then pass radially inward to the bottom of the central cylinder. Air moves up the central cylinder, through the HEPA filter, through a vacuum fan compartment, and exits the vacuum cleaner. A float air flow valve is mounted at the top of the central cylinder. When liquid accumulates to a given level within the central cylinder, the four bypass tubes, and the four canisters, suction is terminated by operation of the float valve.

  2. Deep Vadose Zone Remediation: Technical and Policy Challenges, Opportunities, and Progress in Achieving Cleanup Endpoints

    SciTech Connect (OSTI)

    Wellman, Dawn M.; Freshley, Mark D.; Truex, Michael J.; Lee, Michelle H.

    2013-02-24

    Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical. Use of risk-informed alternate endpoints provides a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable the establishment of a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches.

  3. Critically safe volume vacuum pickup for use in wet or dry cleanup of radioactive enclosures

    DOE Patents [OSTI]

    Zeren, J.D.

    1993-12-28

    A physical compact vacuum pickup device of critically safe volume and geometric shape is provided for use in radioactive enclosures, such as a small glove box, to facilitate manual cleanup of either wet or dry radioactive material. The device is constructed and arranged so as to remain safe when filled to capacity with plutonium-239 oxide. Two fine mesh filter bags are supported on the exterior of a rigid fine mesh stainless steel cup. This assembly is sealed within, and spaced from, the interior walls of a stainless steel canister. An air inlet communicates with the interior of the canister. A modified conventional vacuum head is physically connected to, and associated with, the interior of the mesh cup. The volume of the canister, as defined by the space between the mesh cup and the interior walls of the canister, forms a critically safe volume and geometric shape for dry radioactive particles that are gathered within the canister. A critically safe liquid volume is maintained by operation of a suction terminating float valve, and/or by operation of redundant vacuum check/liquid drain valves and placement of the air inlet. 5 figures.

  4. Critically safe volume vacuum pickup for use in wet or dry cleanup of radioactive enclosures

    DOE Patents [OSTI]

    Zeren, Joseph D.

    1993-12-28

    A physical compact vacuum pickup device of critically safe volume and geometric shape is provided for use in radioactive enclosures, such as a small glove box, to facilitate manual cleanup of either wet or dry radioactive material. The device is constructed and arranged so as to remain safe when filled to capacity with plutonium-239 oxide. Two fine mesh filter bags are supported on the exterior of a rigid fine mesh stainless steel cup. This assembly is sealed within, and spaced from, the interior walls of a stainless steel canister. An air inlet communicates with the interior of the canister. A modified conventional vacuum head is physically connected to, and associated with, the interior of the mesh cup. The volume of the canister, as defined by the space between the mesh cup and the interior walls of the canister, forms a critically safe volume and geometric shape for dry radioactive particles that are gathered within the canister. A critically safe liquid volume is maintained by operation of a suction terminating float valve, and/or by operation of redundant vacuum check/liquid drain valves and placement of the air inlet.

  5. History - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Lawrence's original Cyclotron, for which he received a patent and the Nobel Prize. Lawrence's original cyclotron design was limited to energies where relativistic effects were not important. The third generation cyclotron included "sector-focusing" to allow higher energies to be obtained. The 88-Inch Cyclotron was based on Lawrence's design of a sector-focused cyclotron for the MTA project at Livermore. 1500 man-hours of work were necessary to assemble the trim coils which help

  6. History Publications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History Publications History Publications History Publications Since its establishment in 1957, the Office of History and Heritage Resources (OHHR) has consistently sought to maintain a level of excellence in its publications that meets all scholarly standards and yet is accessible to the general public. At the same time, OHHR has partnered with DOE program offices and field sites to provide historical products that are useful and fill specific departmental needs. In this effort, OHHR has

  7. NTS_History.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atmospheric Nuclear Weapons Testing 1951 - 1963 Battlefi eld of the Cold War The Nevada Test Site United States Department of Energy Volume I Of related interest: Origins of the Nevada Test Site by Terrence R. Fehner and F. G. Gosling The Manhattan Project: Making the Atomic Bomb * by F. G. Gosling The United States Department of Energy: A Summary History, 1977 - 1994 * by Terrence R. Fehner and Jack M. Holl * Copies available from the U.S. Department of Energy 1000 Independence Ave. S.W.,

  8. Mound History and Information

    Office of Legacy Management (LM)

    Mound Site History and Information The Mound site, formerly known as the Mound Plant or Facility, takes its name from a nearby Na- tive American burial mound. The 306 acre facility is sited on a hill in the center of Miamisburg, Ohio. Construction of the Mound Plant began in 1946, and the site became operational in 1949. Mound, the nation's first post-war U.S. Atomic Energy Commission site to be constructed, was established to consolidate and continue the work conducted at the Dayton Units for

  9. Development of site-specific soil cleanup criteria: New Brunswick Laboratory, New Jersey site

    SciTech Connect (OSTI)

    Veluri, V.R.; Moe, H.J.; Robinet, M.J.; Wynveen, R.A.

    1983-03-01

    The potential human exposure which results from the residual soil radioactivity at a decommissioned site is a prime concern during D and D projects. To estimate this exposure, a pathway analysis approach is often used to arrive at the residual soil radioactivity criteria. The development of such a criteria for the decommissioning of the New Brunswick Laboratory, New Jersey site is discussed. Contamination on this site was spotty and located in small soil pockets spread throughout the site area. Less than 1% of the relevant site area was contaminated. The major contaminants encountered at the site were /sup 239/Pu, /sup 241/Am, normal and natural uranium, and natural thorium. During the development of the pathway analysis to determine the site cleanup criteria, corrections for the inhomogeneity of the contamination were made. These correction factors and their effect upon the relevant pathway parameters are presented. Major pathways by which radioactive material may reach an individual are identified and patterns of use are specified (scenario). Each pathway is modeled to estimate the transfer parameters along the given pathway, such as soil to air to man, etc. The transfer parameters are then combined with dose rate conversion factors (ICRP 30 methodology) to obtain soil concentration to dose rate conversion factors (pCi/g/mrem/yr). For an appropriate choice of annual dose equivalent rate, one can then arrive at a value for the residual soil concentration. Pathway modeling, transfer parameters, and dose rate factors for the three major pathways; inhalation, ingestion and external exposure, which are important for the NBL site, are discussed.

  10. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  11. NWP Small Business Status through June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Status through June 2014

  12. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  13. o CNMS Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Town Hall User Meeting (see attached slides) * Agenda: o Intro of UEC o CNMS Status Update o UEC activities o Nominations for open seat on the UEC * Activities o Monthly Telecon o...

  14. Small Business Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a ...

  15. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    news NIF Status Update - 2014 May Gigabar Equation-of-State Experiment Reaches Record Pressures On May 29, the NIF Team fired two gigabar (Gbar)-class equation-of-state experiments...

  16. Fast Global File Status

    Energy Science and Technology Software Center (OSTI)

    2013-01-01

    Fast Global File Status (FGFS) is a system software package that implimints a scalable mechanism to retrieve file information, such as its degree of distribution or replication and consistency.

  17. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on Read More » Timeline and Updates A list of major system changes and updates Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Edison Read More » Last edited: 2016-04-29 11:34:32

  18. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  19. Safety system status monitoring

    SciTech Connect (OSTI)

    Lewis, J.R.; Morgenstern, M.H.; Rideout, T.H.; Cowley, P.J.

    1984-03-01

    The Pacific Northwest Laboratory has studied the safety aspects of monitoring the preoperational status of safety systems in nuclear power plants. The goals of the study were to assess for the NRC the effectiveness of current monitoring systems and procedures, to develop near-term guidelines for reducing human errors associated with monitoring safety system status, and to recommend a regulatory position on this issue. A review of safety system status monitoring practices indicated that current systems and procedures do not adequately aid control room operators in monitoring safety system status. This is true even of some systems and procedures installed to meet existing regulatory guidelines (Regulatory Guide 1.47). In consequence, this report suggests acceptance criteria for meeting the functional requirements of an adequate system for monitoring safety system status. Also suggested are near-term guidelines that could reduce the likelihood of human errors in specific, high-priority status monitoring tasks. It is recommended that (1) Regulatory Guide 1.47 be revised to address these acceptance criteria, and (2) the revised Regulatory Guide 1.47 be applied to all plants, including those built since the issuance of the original Regulatory Guide.

  20. Cleanup of the Oak Ridge Reservation Building the Future by Cleaning up the Past

    Office of Environmental Management (EM)

    Groundwater Strategy Status Dennis Mayton DOE Groundwater Program Project Manager, P.G. Oak Ridge Office of Environmental Management www.energy.gov/EM 2 Groundwater Strategy put in place to document path forward for managing legacy groundwater challenges * Workshops held with regulators in 2013 * DOE/EPA/TDEC agreement on Groundwater Strategy document in 2014 www.energy.gov/EM 3 Groundwater Program put in place to implement the strategy * Resources assigned and program initiated in 2014

  1. Idaho Cleanup Project CPP-603A basin deactivation waste management 2007

    SciTech Connect (OSTI)

    Croson, D.V.; Davis, R.H.; Cooper, W.B.

    2007-07-01

    The CPP-603A basin facility is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the U.S. Department of Energy's (DOE) Idaho National Laboratory (INL). CPP-603A operations are part of the Idaho Cleanup Project (ICP) that is managed by CH2M-WG Idaho, LLC (CWI). Once the inventoried fuel was removed from the basins, they were no longer needed for fuel storage. However, they were still filled with water to provide shielding from high activity debris and contamination, and had to either be maintained so the basins did not present a threat to public or worker health and safety, or be isolated from the environment. The CPP-603A basins contained an estimated 50,000 kg (110,200 lbs) of sludge. The sludge was composed of desert sand, dust, precipitated corrosion products, and metal particles from past cutting operations. The sediment also contained hazardous constituents and radioactive contamination, including cadmium, lead, and U-235. An Engineering Evaluation/Cost Analysis (EE/CA), conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), evaluated the risks associated with deactivation of the basins and the alternatives for addressing those risks. The recommended action identified in the Action Memorandum was to perform interim stabilization of the basins. The sludge in the basins was removed and treated in accordance with the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) and disposed at the INL Radioactive Waste Management Complex (RWMC). A Non-Time Critical Removal Action (NTCRA) was conducted under CERCLA to reduce or eliminate other hazards associated with maintaining the facility. The CERCLA NTCRA included removing a small high-activity debris object (SHADO 1); consolidating and mapping the location of debris objects containing Co-60; removing, treating, and disposing of the basin water; and filling the basins with grout/controlled low strength material (CLSM). The NTCRA is an interim action that reduces the risks to human health and the environment by minimizing the potential for release of hazardous substances. The interim action does not prejudice the final end-state alternative. (authors)

  2. Web Operational Status Boards

    SciTech Connect (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.

  3. Web Operational Status Boards

    Energy Science and Technology Software Center (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.« less

  4. LANL History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission » LANL History LANL History LANL History Since its inception in 1943 as part of the Manhattan Project, Los Alamos National Laboratory's (LANL) primary mission has been nuclear weapons research and development. In executing this mission, LANL released hazardous and radioactive materials to the environment through outfalls, stack releases, and material disposal areas. Additionally, mixed low-level waste and transuranic waste was generated and staged in preparation for off-site

  5. Our History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Us » Our History Our History The Office of Hearings and Appeals is the central adjudicative forum for the Department of Energy. The Secretary of Energy has delegated to the OHA Director the authority to act for him in many different areas. The OHA Director's decision typically serves as final agency action. During it's over 30-year history, OHA has had broad-ranging subject matter jurisdiction. Originally, OHA's primary function was to consider exceptions and other petitions related to

  6. UK Nuclear Cleanup and Research Experts Visit DOE to Expand Collaboration |

    Office of Environmental Management (EM)

    Nuclear Weapons Strategy Delivered to Congress U.S. Nuclear Weapons Strategy Delivered to Congress July 24, 2007 - 2:55pm Addthis WASHINGTON, DC -U.S. Secretary of Energy Samuel W. Bodman joined the U.S. Secretaries of Defense and State in sending to Congress the Bush Administration's nuclear weapons strategy. This document not only describes the history of nuclear deterrence during the Cold War, but reinforces how deterrence applies to present and future security threats, and what a nuclear

  7. Automation Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. PDF icon Automation Status More Documents & Publications PEM Stack Manufacturing: Industry Status 2011 NREL/DOE Hydrogen and Fuel Cell Manufacturing R&D Workshop Report Manufacturing Barriers to High Temperature PEM Commercialization

  8. Our History | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Our History Ames Laboratory was formally established in 1947 by the Atomic Energy Commission as a result of the Ames Project's successful development of the most efficient process ...

  9. ARM - Climate Change Through History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers Teachers' Toolbox Lesson Plans Climate Change Through History Scientists know ... Evidence of Climate Change It is important to remember that even minor fluctuations can ...

  10. OPERATION OF A TRITIUM GLOVEBOX CLEAN-UP SYSTEM USING ZIRCONIUM MANGANESE IRON AND ZIRCONIUM TWO IRON METAL GETTERS

    SciTech Connect (OSTI)

    E. LARSON; K. COOK

    2000-08-01

    A metal hydride-based tritium clean-up system has been successfully operated for more than four years on an 11 m{sup 3} helium/nitrogen glovebox which was used for handling metal tritide powders. The clean-up system consists of two beds: (1) a Zr-Mn-Fe (in a 10% by weight Al binder, SAES ST909) bed operating at 675 C followed by (2) a Zr{sub 2}Fe (SAES ST198) bed operating at 250 C. The Zr-Mn-Fe bed serves to condition the gas stream by cracking hydrogenous impurities (such as H{sub 2}O and hydrocarbons) and absorbing oxygen and carbon. The Zr{sub 2}Fe bed absorbs the hydrogen isotopes from the flowing stream by forming a solid hydride compound. These beds contain 3 kilograms of Zr{sub 2}Fe and have been loaded routinely with 230-250 STP liters of hydrogen isotopes in earlier trials. The Zr-Mn-Fe alloy exhibits an anomaly during activation, namely an exotherm upon initial exposure to nitrogen. The purpose of this work is to better understand this reaction. Nitrogen absorption studies were done in order to quantify the nitrogen taken up by the getter and to characterize the reaction kinetics. In addition, ST909 phases before and after the reaction were studied with x-ray diffraction.

  11. Manipulating subsurface colloids to enhance cleanups of DOE waste sites. 1997 annual progress report

    SciTech Connect (OSTI)

    Gschwend, P.M.

    1997-01-01

    'This research is aimed at (a) developing improved understandings of the processes involved in holding colloids immobile in subsurface media, and (b) exploring the prospects for mobilizing such colloids to enhance cleanups. These colloids are important because they are the many contaminants of concern. chief sorbent media for The following briefly describes the efforts manuscript (currently submitted to Environmental also appended. in the last year. A draft Science and Technology) is Mechanisms Controlling Colloid Releases (Swartz) Using aquifer materials from a Southeastern Coastal Plain site, the authors have explored the mechanisms which control the releases of attached colloids into the groundwater flow. First, the authors have completed electron microscopy observations regarding the intimate particle:particle juxtapositions in the solids (Swartz et al. Geochim. Cosmochim. Acta 61, 707, 1997.) Next, by flushing these aquifer sands with various aqueous solutions, the authors have found that the bulk of the attached colloids appear to be (a) bound to one another via intermediary amorphous iron oxyhydroxides, and (b) attracted to the other colloids by juxtapositions of oppositely charged phases (manuscript submitted to Environ. Sci. Technol. and attached.) The authors suspect that this combination of inter-colloid interactions may be especially important in geologically young deposits where diagenetic processes have not produced highly crystalline solids yet. As a result of these observations and laboratory manipulations, the authors believe the authors understand the steps necessary to initiate colloid mobilization at such a groundwater site. First, one must apply solution constituents which are suited to dissolving a limited portion of the amorphous iron oxyhydroxides. The authors have accomplished this using 0.5 mM ascorbic acid (i.e., vitamin C.) Next, one must reverse the surface charges of either the negatively charged alumino-silicate clays or the adjacent positively charged iron oxyhydroxides. The authors have used 0.5 \\265m phosphate solutions (pH 5.2) to drive the iron oxyhydroxides to a net negative surface charge. By working at only millimolar levels, the resulting total solution ionic strength is still low enough to permit the corresponding expanded double layers to push the now like-charge colloids apart. In the laboratory, this results in a sustained presence of about 2 mg colloids per liter of flushing solution for at least many tens of pore volumes. In the author''s continuing efforts, he has returned to the field site, where the aquifer solids were initially collected, and tested the possibility of using such ascorbic acid-phosphate solutions to mobilize colloids in the ground. Efforts have proven successful as measured by the presence of turbidity in suitably altered flushing solutions (and the absence of turbidity in control tests). The author is now completing measurements of the ancillary parameters necessary to interpret the field tests.'

  12. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    SciTech Connect (OSTI)

    1998-05-01

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

  13. Corrective Action Unit Deliverable/Task Status Tracking Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    The CDSTool is a project management tool designed specifically to manage environmental restoration projects. The tool allows users to capture all projects in their baseline, develop and assign approaches, assign documents and reviews to particular projects and approaches, track and measure progress and status of each document/phase/activity in the project, based on the approach. The CDSTtool provides the ability to assign responsible personnel to each activity, provide status to scheduling software, track WBS, capture issues,more » comments, and history of development or performance related to the activity, document or phase.« less

  14. Glueballs: a status report

    SciTech Connect (OSTI)

    Scharre, D.L.

    1982-01-01

    It is expected from quantum chromodynamics (QCD) that glueballs, bound states which contain gluons but no valence quarks, should exist. To date, no conclusive evidence for glueballs has been presented. After a brief review of the expected properties and experimental signatures of glueballs the status of some glueball candidate states are discussed.

  15. Drop History? No! | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Drop History? No! Drop History? No! February 29, 2012 When I was in high school in England, especially in the smaller country schools, teachers were scarce and schedules, therefore, constrained. Further, the English style is for students to choose directions, and therefore subjects, at a relatively early age. So, at age 13, I had to choose between Physics and Chemistry on the one hand, and Latin and History on the other. Of course, I chose Physics and Chemistry, but thereby lost two subjects in

  16. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    SciTech Connect (OSTI)

    Seed, Ian; James, Paula; Mathieson, John; Judd, Laurie; Elmetti-Ramirez, Rosa; Han, Ana

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and the effective pooling and exchange of knowledge and experience can only be of benefit to all participants to help complete the cleanup mission more quickly and more cost effectively. This paper examines in detail the tools and processes used to promote information exchange and the progress made to date. It also discusses the challenges and issues involved and proposes recommendations to others who are involved in similar activities. (authors)

  17. Nuclear reactor characteristics and operational history

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: TBD See also: Table 1. Capacity and ...

  18. Y-12 and uranium history

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    did happen six days after he was given the assignment. The history of uranium at Y-12 began with that decision, which will be commemorated on September 19, 2012, at...

  19. Chemical gel barriers as low-cost alternative to containment and in situ cleanup of hazardous wastes to protect groundwater

    SciTech Connect (OSTI)

    1997-01-01

    Chemical gel barriers are being considered as a low-cost alternative for containment and in situ cleanup of hazardous wastes to protect groundwater. Most of the available gels in petroleum application are non-reactive and relative impermeable, providing a physical barriers for all fluids and contaminants. However, other potential systems can be envisioned. These systems could include gels that are chemically reactive and impermeable such that most phase are captured by the barriers but the contaminants could diffuse through the barriers. Another system that is chemically reactive and permeable could have potential applications in selectivity capturing contaminants while allowing water to pass through the barriers. This study focused on chemically reactive and permeable gel barriers. The gels used in experiment are DuPont LUDOX SM colloidal silica gel and Pfizer FLOPAAM 1330S hydrolyzed polyacrylamide (HPAM) gel.

  20. LAMPF: proposal status and summaries

    SciTech Connect (OSTI)

    Rayburn, L.; Talley, B.

    1982-03-01

    Revisions and additions are given for LAMPF proposal summaries and status reports. These apply to LA-7444-MS. (GHT)

  1. National Hydrogen Learning Demonstration Status

    Broader source: Energy.gov [DOE]

    Presentation slides from the Fuel Cell Technologies Program webinar "National Hydrogen Learning Demonstration Status" held February 6, 2012.

  2. FTCP History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History FTCP History In 1993, the Board issued Recommendation 93-3, Improving DOE Technical Capability in Defense Nuclear Facilities. This recommendation resulted in DOE's establishing the Federal Technical Capability Panel (FTCP) and developing two noteworthy standards: DOE M 426.1-1, Federal Technical Capability Manual, and DOE G 426.1-1, Recruiting, Hiring, and Retaining High Quality Technical Staff: A Manager's Guide to Administrative Flexibilities. These standards provide techniques and

  3. Bartlesville History | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bartlesville History Bartlesville History The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. Origins of the U.S. Government's First Petroleum Research Laboratory By 1916 the Bureau of Mines, which had been established six years earlier in the U.S. Department of the Interior, recognized the transforming role that petroleum was playing in American society. Across the country, the Bureau had

  4. ARM Orientation: Overview and History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Warren Wiscombe ARM Chief Scientist Brookhaven & NASA ARM Orientation: ARM Orientation: Overview and History Overview and History Mar 2007 ARM Orientation 2 ARM ARM Atmospheric Radiation Measurement Atmospheric Radiation Measurement ARM Chief Scientist Team ARM Chief Scientist Team Ric Cederwall Andy Vogelmann Sharon Zuhoski Yangang Liu Pavlos Kollias ARM ARM Atmospheric Radiation Measurement Atmospheric Radiation Measurement 3 Mar 2007 ARM Orientation ARM in a nutshell ARM in a nutshell *

  5. ARM Orientation: Overview and History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    009 ARM Orientation 1 Warren Wiscombe ARM Chief Scientist Brookhaven & NASA ARM Orientation: ARM Orientation: Overview and History Overview and History Mar 2009 ARM Orientation 2 Mar 2007 ARM Orientation 2 ARM Chief Scientist Team ARM Chief Scientist Team Ric Cederwall Andy Vogelmann Sharon Zuhoski Yangang Liu Pavlos Kollias Mar 2009 ARM Orientation 3 Mar 2007 ARM Orientation 3 ARM in a nutshell ARM in a nutshell * Created to improve cloud and radiation physics and cloud simulation

  6. Molybdenum-based additives to mixed-metal oxides for use in hot gas cleanup sorbents for the catalytic decomposition of ammonia in coal gases

    DOE Patents [OSTI]

    Ayala, Raul E.

    1993-01-01

    This invention relates to additives to mixed-metal oxides that act simultaneously as sorbents and catalysts in cleanup systems for hot coal gases. Such additives of this type, generally, act as a sorbent to remove sulfur from the coal gases while substantially simultaneously, catalytically decomposing appreciable amounts of ammonia from the coal gases.

  7. U.S. Department of Energy to Host Press Call on Transition of Legacy Cleanup Work at Los Alamos National Laboratory

    Broader source: Energy.gov [DOE]

    On Wednesday, December 3, 2014, the Office of Environmental Management (EM) and the National Nuclear Security Administration (NNSA) will host a press call to discuss the Department’s plans for transitioning management and oversight of the legacy environmental cleanup work at Los Alamos National Laboratory from NNSA to EM.

  8. Overview and History of DOE's Hanford Site - 12502

    SciTech Connect (OSTI)

    Flynn, Karen; McCormick, Matt [US DOE (United States)

    2012-07-01

    Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses

  9. SuperNEMO status

    SciTech Connect (OSTI)

    Chapon, A. [Universite de Caen Basse-Normandie, ENSICAEN, LPC Caen, UMR 6534, 6 boulevard du Marechal Juin, 14050 CAEN Cedex (France); Collaboration: SUPERNEMO Collaboration

    2011-12-16

    The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The SuperNEMO project strongly inherits from the previous Nemo3 experiment. It will consist of a ''tracko-calo'' modular detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foils, radiopurity control, tracker and calorimeter.

  10. ESnet Planning, Status,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network

  11. PDSF Login Node Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDSF Login Node Status Getting Started Hardware Configuration Using the PDSF Batch System Performance and Optimization Software and Tools Announcements and Meetings Cluster Statistics Getting help Group Pages Using Carver for PDSF jobs PDSF Completed Jobs Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users

  12. Small Business Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following

  13. Electronic Status Board

    Energy Science and Technology Software Center (OSTI)

    2004-06-02

    This software was developed to post real-time process status and building conditions to operators, system engineers, system managers, and all support personnel. Data input is via operator console, strategically located throughout the facility, or by electronic rounds tablet. The system requires a person to log in with a unique user id and password to edit data. Viewing system status does not require log in and can be done from any desktop location running FileMaker. Oncemore » logged into the system, all new records saved are stamped with date, time and user name, and a historical copy is created that can be brought up to review status. There is no limitation to the amount of records that can be saved in the historical databases. The system will flag all out of limit conditions on the screen and enter that record on a turnover summery page which displays only flagged items. System conditions are displayed on a plasma display which scrolls through the various system condition screens. The system also shows floor plans that reflect specific building radiological conditions which aides in pre job briefings to show all hazards to personnel entering specific locations. The input screen is displayed on a second standard computer monitor connected to the input PC. There are several popup screens that require user intervention to ensure that the user wants to edit the data, is editing the appropriate sytem, and if they want to continue to stay logged into the system. Each workstation is connected to a Uninterrupted Power Supply which will shut each system down safely in a power failure. The server is configured to print out current status upon notification from the UPS that power has failed. The system also has a video input card which is connected to a DVD/VCR which shows safety meetings, and images taken from a digital camera used to show specific locations/items for pre-job briefings.« less

  14. MARS Flight Engineering Status

    SciTech Connect (OSTI)

    Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

    2010-04-06

    The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

  15. Tag: History | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Tag: History Displaying 1 - 10 of 119... Category: About Deputy Secretary meets two calutron girls When the Deputy Secretary of Energy, Elizabeth Sherwood-Randall, was in...

  16. Weekly Petroleum Status Report

    U.S. Energy Information Administration (EIA) Indexed Site

    All Petrolem Reports Weekly Petroleum Status Report Data for week ending May 20, 2016 | Release Date: May 25, 2016 | Next Release Date: June 2, 2016 | full report Previous Issues Week: May 25, 2016 May 18, 2016 May 11, 2016 May 4, 2016 April 27, 2016 April 20, 2016 April 13, 2016 April 6, 2016 March 30, 2016 March 23, 2016 March 16, 2016 March 9, 2016 March 2, 2016 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30

  17. Current status of APEX

    SciTech Connect (OSTI)

    Betts, R.R.

    1993-10-01

    The ATLAS Positron Experiment (APEX) is designed to investigate narrow structures observed in the energy spectra of positions and positron-electron coincidences produced in collisions of high Z ions with high Z targets at Coulomb barrier energies. The apparatus consists of a large diameter uniform-field solenoid mounted transverse to the beam direction. Scattered heavy ions are detected in a gas-counter array. Electrons and positrons transversing the solenoid are detected in highly segmented silicon arrays surrounded by position sensitive NaI detectors for positron identification. The concept of APEX and the current status of the apparatus will be discussed.

  18. Status of Wheeler Reservoir

    SciTech Connect (OSTI)

    Not Available

    1990-09-01

    This is one in a series of status reports prepared by the Tennessee Valley Authority (TVA) for those interested in the conditions of TVA reservoirs. This overview of Wheeler Reservoir summarizes reservoir purposes and operation, reservoir and watershed characteristics, reservoir uses and use impairments, and water quality and aquatic biological conditions. The information presented here is from the most recent reports, publications, and original data available. If no recent data were available, historical data were summarized. If data were completely lacking, environmental professionals with special knowledge of the resource were interviewed. 12 refs., 2 figs.

  19. Women in Los Alamos History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Women in Los Alamos History Women in Los Alamos History WHEN: Mar 03, 2016 5:30 PM - 8:00 PM WHERE: Los Alamos Golf Course Clubhouse SPEAKER: Jill Tietjen CONTACT: Sarah Terrill (505) 709-0089 CATEGORY: Community INTERNAL: Calendar Login Event Description Tietjen is a well-known speaker on the topic of gender issues in the work place, and a motivational speaker for young women working toward educations and careers in science, engineering, technology and math (STEM). The community is invited to

  20. The history of the LHC

    SciTech Connect (OSTI)

    2010-05-11

    Abstract: From the civil engineering, to the manufacturing of the various magnet types, each building block of this extraordinary machine required ambitious leaps in innovation. This lecture will review the history of the LHC project, focusing on the many challenges -- scientific, technological, managerial -- that had to be met during the various phases of R&D;, industrialization, construction, installation and commissioning.