National Library of Energy BETA

Sample records for higher purchase costs

  1. Municipal Bond- Power Purchase Agreement Model Continues to Provide Low-Cost Solar Energy

    Broader source: Energy.gov [DOE]

    Provides an overview for power purchase agreement model to provide low-cost solar energy. Author: National Renewable Energy Laboratory

  2. Pallets of PV: Communities Purchase Solar and Drive Down Costs...

    Open Energy Info (EERE)

    5 July, 2012 - 13:20 imported OpenEI Article originally published at NREL's Renewable Energy Project Finance website Think of it like Costco or Sam's Club for purchasing solar...

  3. Lower Cost, Higher Performance Carbon Fiber

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C. David (Dave) Warren Field Technical Manager Transportation Materials Research Oak Ridge National Laboratory P.O. Box 2009, M/S 8050 Oak Ridge, Tennessee 37831-8050 Phone: 865-574-9693 Fax: 865-574-0740 Email: WarrenCD@ORNL.GOV Lower Cost, Higher Performance Carbon Fiber 14 February 2011 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Questions for Today Materials How can the cost of carbon fiber suitable for higher performance applications (H 2 Storage) be

  4. Market failures, consumer preferences, and transaction costs inenergy efficiency purchase decisions

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott

    2004-11-23

    Several factors limit the energy savings potential and increase the costs of energy-efficient technologies to consumers. These factors may usefully be placed into two categories; one category is what economists would define as market failures and the other is related to consumer preferences. This paper provides a conceptual framework for understanding the roles of these factors, and develops a methodology to quantify their effects on costs and potentials of two energy efficient end uses - residential lighting and clothes washers. It notes the significant roles played by the high implicit cost of obtaining information about the benefits of the two technologies and the apparent inability to process and utilize information. For compact fluorescent lamps, this report finds a conservative estimate of the cost of conserved energy of 3.1 cents per kWh. For clothes washers, including water savings reduces the cost of conserved energy from 13.6 cents to 4.3 cents per equivalent kWh. Despite these benefits, market share remains low. About 18 million tons of CO2 could be saved cost effectively from 2005 sales of these two technologies alone. The paper also notes that trading of carbon emissions will incur transaction costs that will range from less than 10 cents per metric ton of CO2 for larger size projects and programs to a few dollars per metric ton of carbon for the smaller ones.

  5. Green Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Green Purchasing Green Purchasing LANL is committed to purchasing and using environmentally preferable products. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Purchasing Green Products Our goal is to purchase items that contain recycled content except when the items are not available at a reasonable price or do not meet performance standards. Environmentally preferable means products or services that have a smaller

  6. Municipal Bond - Power Purchase Agreement Model Continues to...

    Broader source: Energy.gov (indexed) [DOE]

    power purchase agreement model to provide low-cost solar energy. Author: National Renewable Energy Laboratory Municipal Bond - Power Purchase Agreement Model Continues to Provide...

  7. CONTRACTOR PURCHASING SYSTEM REVIEWS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 1 APPENDIX C CONTRACTOR PURCHASING SYSTEM REVIEWS RISK ASSESSMENT MATRIX RISK CATEGORY PERFORMANCE SCHEDULE COST HIGH (3) --Performance data casts significant doubt on the ability of the system or key process ability to meet requirements. A major disruption is highly probable and the likelihood is that the supplier will not achieve the performance, schedule or cost objectives * Delinquent end item delivery * Poor or nonexistent internal audit/self governance * Failure to meet

  8. Green Purchasing & Green Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchasing & Technology Goals 6 & 7: Green Purchasing & Green Technology Our goal is to purchase and use environmentally sustainable products whenever possible and to implement...

  9. 2017 Levelized Costs AEO 2012 Early Release

    U.S. Energy Information Administration (EIA) Indexed Site

    Report," collects the cost and quality of fossil fuel purchases made by electric ... a reduction of approximately 9 percent of natural gas purchases, cost, and quality data. ...

  10. Power Purchase Agreements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar.

  11. Silicon Ink Technology Offers Path to Higher Efficiency Solar Cells at Lower Cost

    Broader source: Energy.gov [DOE]

    EERE supported the development of the first liquid silicon on the market that offers a novel path to producing more efficient solar cells at lower cost.

  12. Green Power Purchasing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: The green power purchasing goal has a target date of 2011. It has not been increased subsequently.

  13. Power Purchase Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Purchase Agreements Chandra Shah, NREL 303-384-7557 chandra.shah@nrel.gov February 2011 revised 2 | Federal Energy Management Program eere.energy.gov Overview * Customer-sited power purchase agreement (PPA) definition * Project process * Project examples * Utility Renewable Energy Services Contract (URESC) * Enhanced use lease (EUL) * PPA support, resources and key points 3 | Federal Energy Management Program eere.energy.gov * Private entity purchases, installs, owns, operates and

  14. Uranium Purchases Report

    Reports and Publications (EIA)

    1996-01-01

    Final issue. This report details natural and enriched uranium purchases as reported by owners and operators of commercial nuclear power plants. 1996 represents the most recent publication year.

  15. Power Purchase Agreement Webinars

    Broader source: Energy.gov [DOE]

    Provides a listing of past power purchase agreement webinars and associated files. Author: U. S. Department of Energy, Energy Efficiency & Renewable Energy

  16. Solar Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    Provides an overview of solar power purchase agreements including how they work, benefits and challenges and eligibility. Author: United States Environmental Protection Agency (EPA)

  17. Purchasing | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 44 states. Purchased Items and supplier base: Biological Materials Chemicals Computers, Monitors and Printers Furniture Laboratory Supplies Metals Office Supplies...

  18. The ENERGY STAR Purchasing Initiative

    SciTech Connect (OSTI)

    Dolin, Jennifer, R.; Raynolds, Ned, R.

    1998-08-23

    Federal, state, and local governments could save at least $139 million annually by reducing energy waste through the purchase and use of energy-efficient products. Reducing this waste would reduce annual greenhouse gas emissions by 4.1 million metric tons of carbon (MMTCs) by the year 2010; the equivalent of planting an area of trees the size of Yellowstone National Park. In addition, with $50-70 billion in purchasing power for energy-related products, specifying energy efficiency could significantly shift the market for these products. The Federal government recently launched the ENERGY STAR® Purchasing Initiative to channel the purchasing power of state and local governments -and its environmental impact- in the direction of energy-efficient products to capture significant environmental benefits and increase the demand in the marketplace. Part of this effort studied why governments don’t currently procure the most efficient products, and attempted to identify the changes that would be necessary to allow many governments to do so. Some of the initial barriers to energy-efficient procurement that were found are: • Lack of information about the availability of energy-efficient products; • Split incentives, where the agency purchasing the products do not pay for the utility bills directly and, therefore, have little interest, or incentive, to save energy; • Misinformation about the benefits of energy efficiency; • Energy efficiency not seen as a value-added aspect of procurement; • Budget constraints; and • Lowest first-cost bias. This paper will present the results of this study and describe the mechanisms that will be put into place to address each of these barriers.

  19. NREL: Sustainable NREL -Green Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Green Purchasing Committed to protecting the natural environment, NREL promotes green purchasing-also referred to as sustainable acquisition-by: Implementing new policies,...

  20. CONDITIONS OF PURCHASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of 2 GE Global Research CONDITIONS OF PURCHASE - SHORT FORM (May 2013) 1. ACCEPTANCE AND TERMS AND CONDITIONS: This purchase is subject to all of the terms and conditions set forth herein. This Order does not constitute an acceptance by GE of any offer to sell, quotation, or proposal. Any variation of the terms of this Order is not binding upon GE unless specifically accepted by GE in writing, and GE hereby rejects such proposed modifications. This Order is intended by the parties as a final,

  1. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  2. CONDITIONS OF PURCHASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GEGR-N Goods PO 1 of 8 GE Global Research CONDITIONS OF PURCHASE (May 2013) INTEGRITY STATEMENT: If you as a Supplier become aware of any situation that appears to be inconsistent with GE's Policy to maintain lawful and fair practices in its supplier relationships, you may write to our GEGR Ombudsman at: Global Research, One Research Circle, Niskayuna, NY 12309. 1. ACCEPTANCE AND TERMS AND CONDITIONS: (a) Seller accepts this Order and any amendments thereto by signing the acceptance copy and

  3. Sustainable Purchasing Leadership Council Summit

    Broader source: Energy.gov [DOE]

    The Summit brings together 300 leaders in sustainable purchasing from the public, private, and NGO sectors to share best and emerging practices across sectors and regions.

  4. Volume Purchasing Alliances

    Broader source: Energy.gov [DOE]

    Economies of scale can potentially reduce first costs of capital expenditures, given that price quotes for LED products often vary significantly by the size of the order, particularly when less...

  5. Jackson Purchase Energy Corporation | Open Energy Information

    Open Energy Info (EERE)

    Jackson Purchase Energy Corporation Jump to: navigation, search Name: Jackson Purchase Energy Corporation Place: Kentucky Phone Number: 270.442.7321 or 800.633.4044 Website:...

  6. Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Purchase Agreements Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar. PDF icon afoppapres.pdf More Documents ...

  7. Purchasing Solar Collectively with Solarize

    Broader source: Energy.gov [DOE]

    This video provides an overview of the concept behind The Solarize Guidebook, which offers neighborhoods a plan for getting volume discounts when making group purchases of rooftop solar energy...

  8. Green Purchasing & Green Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Green Leases Green Leases Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures Policy Memorandum Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart Attachment 4: Unrevised SFO Paragraphs Reissued

    Purchasing & Technology Goals 6 & 7: Green Purchasing & Green

  9. Evaluation of higher distribution and/or utilization voltages. Second interim report (March 1979): identification of components and parameters for cost and energy-efficiency analysis

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    This interim report provides documentation on the second task, Identification of Components and Parameters for Cost and Energy-Efficiency Analysis, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes an identification of the elements of the distribution/utilization system, a characterization of the distribution elements and a characterization of end use elements. The purpose of this task is to identify the distribution and utilization system elements which will be subjected to a detailed analysis and computer modeling in later tasks. The elements identified are characterized in terms of their interface with other elements in the system and with respect to their energy consumption, efficiency, and costs. A major output of this task is a list of elements to be modeled under Task 3 and a set of specifications for the computer model to be developed under that task.

  10. A Guide to making Energy-Smart Purchases

    SciTech Connect (OSTI)

    1999-04-01

    Being more energy efficient can be as simple and inexpensive as buying and installing caulk and weatherstripping or as complicated and expensive as building a state-of-the-art, energy-efficient house. However, whatever you do to reduce energy costs will usually require the purchase of goods or services.

  11. DOE Purchase Card Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchase Card Policy DOE Purchase Card Policy Purchase Card Policies for Hq epp-training-P-Card.pptx (722.23 KB) Sustainable Acquisition Training for Purchase Cardholders and Approving.pptx (718.92 KB) More Documents & Publications Microsoft PowerPoint - ShanasBioSlides121307 Updated Section H Greening Clauses Webinar: Bioproducts in the Federal Bioeconomy Portfolio Webinar

  12. Purchase, Delivery, and Storage of Gases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchase, Delivery, and Storage of Gases Print ALS users should follow Berkeley Lab policy, as described below, for the purchase, delivery, storage, and use of all gases at the...

  13. City of Philadelphia- Green Power Purchasing

    Broader source: Energy.gov [DOE]

    *In contrast to renewable energy purchasing goals of many local governments, Philadelphia's initiative targets total electricity use within the city as opposed to only purchases made by the city ...

  14. South Carolina Municipalities- Green Power Purchasing

    Broader source: Energy.gov [DOE]

    Participating residential customers are able to purchase this green power for $3 per 100 kWh block. Commercial participants are able to purchase the power for $6 per 200 kWh block.

  15. Quick Guide: Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quick Guide: Power Purchase Agreements Quick Guide: Power Purchase Agreements Fact sheet explains on-site renewable power purchase agreements (PPAs) and includes which questions to...

  16. Community Wind Handbook/Purchase Equipment | Open Energy Information

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Purchase Equipment The purchase of a turbine for a small community wind project is...

  17. ,"Domestic Crude Oil First Purchase Prices for Selected Crude...

    U.S. Energy Information Administration (EIA) Indexed Site

    Purchase Price (Dollars per Barrel)","Heavy Louisiana Sweet First Purchase Price (Dollars per Barrel)","Light Louisiana Sweet First Purchase Price (Dollars per Barrel)","Mars Blend ...

  18. City of Chicago- Green Power Purchasing

    Broader source: Energy.gov [DOE]

    For more green power purchasing program listings, visit the U.S. Department of Energy Green Power Network.

  19. Guide to Purchasing Green Power

    Broader source: Energy.gov [DOE]

    The Guide to Purchasing Green Power is intended for organizations that are considering the merits of buying green power as well as those that have decided to buy it and want help doing so. The guide was written for a broad audience, including businesses, government agencies, universities, and all organizations wanting to diversify their energy supply and reduce the environmental impact of their electricity use. The Guide can help with planning an on-site renewable generation project.

  20. purchasing | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    purchasing Supply Chain Management Center event highlights how small businesses can help NNSA carry out its missions The Supply Chain Management Center (SCMC) has been an important tool for NNSA to save taxpayer dollars. At the event on Feb. 18, NNSA leadership and the New Mexico congressional delegation were well represented. From left, Scott Bissen, SCMC Director; Rep. Steve Pearce (R-NM); NNSA Administrator

  1. Fact #595: November 2, 2009 Plug-in Hybrid Vehicle Purchases May Depend on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Savings and Incremental Cost | Department of Energy 5: November 2, 2009 Plug-in Hybrid Vehicle Purchases May Depend on Fuel Savings and Incremental Cost Fact #595: November 2, 2009 Plug-in Hybrid Vehicle Purchases May Depend on Fuel Savings and Incremental Cost The recently released results of a 2008 survey on plug-in hybrid vehicles (PHEVs) show that 42% of respondents said there was some chance that they would buy a PHEV sometime in the future. Questions were also asked that gave an

  2. Third-Party Financing and Power Purchase Agreements for Public Sector PV

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Third-Party Financing and Power Purchase Agreements for Public Sector PV Projects Third-Party Financing and Power Purchase Agreements for Public Sector PV Projects Introductory presentation on the third party PPA model for public sector PV. Date May 2009 Topic Solar Basics & Educating Consumers Financing, Incentives & Market Analysis Subprogram Soft Costs Author National Renewable Energy Laboratory may_27th_ppa_for_pv_webinar_jason_coughlin_nrel.ppt

  3. Power Purchase Agreements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A Power Purchase Agreement (PPA) is a financing structure that enables property owners or tenants, including state and local governments, to realize the benefits of renewable...

  4. Purchasing Energy-Efficient Residential Furnaces | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Furnaces Purchasing Energy-Efficient Residential Furnaces The Federal Energy Management Program (FEMP) provides acquisition guidance for residential furnaces, a product category ...

  5. Workplace Charging Challenge Partner: Purchase College, State...

    Energy Savers [EERE]

    Purchase College, State University of New York can accommodate six vehicles at four charging stations throughout campus. In addition to the two charging stations installed in 2012, ...

  6. ASPEN costing manual

    SciTech Connect (OSTI)

    Schwint, K.J.

    1986-07-25

    The ASPEN program contains within it a Cost Estimation System (CES) which estimates the purchase cost and utility consumption rates for major pieces of equipment in a process flowsheet as well as installed equipment costs. These estimates are ''preliminary-study grade'' with an accuracy of plus or minus 30%. The ASPEN program also contains within it an Economic Evaluation System (EES) which estimates overall capital investment costs, annual operating expenses and profitability indices for a chemical plant. This ASPEN costing manual has been written as a guide for those inexperienced in the use of ASPEN and unfamiliar with standard cost estimating techniques who want to use the ASPEN CES and EES. The ASPEN Costing Manual is comprised of the following sections: (1) Introduction, (2) ASPEN Input Language, (3) ASPEN Cost Estimation System (CES), (4) ASPEN Cost Blocks; and (5) ASPEN Economic Evaluation System (EES).

  7. Purchase, Delivery, and Storage of Gases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchase, Delivery, and Storage of Gases Print ALS users should follow Berkeley Lab policy, as described below, for the purchase, delivery, storage, and use of all gases at the ALS. See Shipping and Receiving for information on any non-gas deliveries. Contacts: Gas purchase or delivery: ALS Receiving, 510-486-4494 Gas use and storage: Experiment Coordination, 510-486-7222, This e-mail address is being protected from spambots. You need JavaScript enabled to view it Gas Storage: Berkeley Lab

  8. Purchase, Delivery, and Storage of Gases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchase, Delivery, and Storage of Gases Print ALS users should follow Berkeley Lab policy, as described below, for the purchase, delivery, storage, and use of all gases at the ALS. See Shipping and Receiving for information on any non-gas deliveries. Contacts: Gas purchase or delivery: ALS Receiving, 510-486-4494 Gas use and storage: Experiment Coordination, 510-486-7222, This e-mail address is being protected from spambots. You need JavaScript enabled to view it Gas Storage: Berkeley Lab

  9. Purchase, Delivery, and Storage of Gases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchase, Delivery, and Storage of Gases Print ALS users should follow Berkeley Lab policy, as described below, for the purchase, delivery, storage, and use of all gases at the ALS. See Shipping and Receiving for information on any non-gas deliveries. Contacts: Gas purchase or delivery: ALS Receiving, 510-486-4494 Gas use and storage: Experiment Coordination, 510-486-7222, This e-mail address is being protected from spambots. You need JavaScript enabled to view it Gas Storage: Berkeley Lab

  10. Purchase, Delivery, and Storage of Gases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchase, Delivery, and Storage of Gases Print ALS users should follow Berkeley Lab policy, as described below, for the purchase, delivery, storage, and use of all gases at the ALS. See Shipping and Receiving for information on any non-gas deliveries. Contacts: Gas purchase or delivery: ALS Receiving, 510-486-4494 Gas use and storage: Experiment Coordination, 510-486-7222, This e-mail address is being protected from spambots. You need JavaScript enabled to view it Gas Storage: Berkeley Lab

  11. ,"Domestic Crude Oil First Purchase Prices by Area"

    U.S. Energy Information Administration (EIA) Indexed Site

    "Back to Contents","Data 1: Domestic Crude Oil First Purchase Prices by Area" ...0050063","F0050743" "Date","U.S. Crude Oil First Purchase Price (Dollars per ...

  12. Use of New Strategically Sourced Blanket Purchase Agreement....

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Use of New Strategically Sourced Blanket Purchase Agreement. . . Use of New Strategically Sourced Blanket Purchase Agreement. . . Policy Flash More Documents & Publications Policy ...

  13. Energy Department Issues Tribal Renewable Energy Purchase Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project...

  14. Energy Department Issues Tribal Renewable Energy Purchase Guidance...

    Energy Savers [EERE]

    Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources December ...

  15. Boulder Valley School District (Colorado) Power Purchase Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School ...

  16. Table 22. Domestic Crude Oil First Purchase Prices for Selected...

    U.S. Energy Information Administration (EIA) Indexed Site

    Form EIA-182, "Domestic Crude Oil First Purchase Report." 22. Domestic Crude Oil First Purchase Prices for Selected Crude Streams 44 Energy Information Administration ...

  17. Guide to Purchasing Green Power: Renewable Electricity, Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Guide to Purchasing Green Power: Renewable Electricity, ...

  18. 2015 Awards For Leadership In Sustainable Purchasing Announced...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Awards For Leadership In Sustainable Purchasing Announced 2015 Awards For Leadership In Sustainable Purchasing Announced June 3, 2015 - 8:32am Addthis (L to R) Anastasia ...

  19. Purchasing Energy-Efficient Water-Cooled Ice Machines | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Energy-Efficient Water-Cooled Ice Machines Purchasing Energy-Efficient Water-Cooled Ice Machines The Federal Energy Management Program (FEMP) provides efficiency ...

  20. Table A27. Quantity of Purchased Electricity, Steam, and Natural...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... purchased by a central purchasing office offsite, and quantities for" "which payment is made in-kind." " Source: Energy Information Administration, Office of Energy ...

  1. Federal Government Awards Multi-Agency Solar Power Purchase in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, ...

  2. Initial Application for FAC-C, Purchasing, Financial Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initial Application for FAC-C, Purchasing, Financial Assistance and Property Management Certification Initial Application for FAC-C, Purchasing, Financial Assistance and Property ...

  3. Buy Energy-Efficient Products: A Guide for Federal Purchasers...

    Energy Savers [EERE]

    Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers Document encourages ...

  4. DOE ORP Purchase Card Buyers - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10,000.00 50,000.00 Layne Papenfuss Paper 10,000.00 50,000.00 *Marc McCusker or Kelly Brazil may purchase for any category in case of emergency, for any contractual...

  5. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  6. Important Idaho habitat now protected through purchase

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4.2 million purchase of Hammer Flat. The City of Boise, Idaho Department of Fish and Game, and the Bonneville Power Administration worked together to protect the nearly 705 acre...

  7. Sustainable Electric Utility (SEU)- SREC Purchase Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    SREC purchase program is a joint incentive of Delaware Division of Energy and Climate (DNREC) and the state’s Sustainable Energy Utility (SEU). The program offers a standard onetime payment of $450...

  8. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  9. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Purchasing and Subcontracting Opportunities NREL's procurement policy is based on effective and meaningful competition. View all upcoming purchasing and subcontracting opportunities below and email the assigned contact for more information. Recurring Products and/or Services Solicitation Time Frame Point of Contact Banking Agreement Fall 2016 Jeffrey.Soltesz@nrel.gov Basic IT Support Fall 2016 Kimberley.Lopez@nrel.gov IT Scientific and Business Support Fall 2016 Kimberley.Lopez@nrel.gov

  10. Workplace Charging Challenge Partner: Purchase College, State University of New York

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2015Headquarters: Purchase, NYCharging Location: Purchase, NYDomestic Employees: 678

  11. Federal Off-Site Renewable Energy Purchases and Renewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certificates | Department of Energy Renewable Energy Procurement » Federal Off-Site Renewable Energy Purchases and Renewable Energy Certificates Federal Off-Site Renewable Energy Purchases and Renewable Energy Certificates If developing an on-site renewable energy project is impractical, federal agencies can purchase renewable energy from off-site renewable energy projects or purchase renewable energy certificates (RECs). Renewable energy purchases do not require project financing and can

  12. Purchasing Energy-Efficient Residential Furnaces

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for residential furnaces, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  13. Purchasing Energy-Efficient Commercial Fryers

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial fryers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  14. Purchasing Energy-Efficient Light Bulbs

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for light bulbs, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR qualified products or FEMP designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  15. Purchasing Energy-Efficient Commercial Steam Cookers

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial steam cookers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  16. Purchasing Energy-Efficient Geothermal Heat Pumps

    Broader source: Energy.gov [DOE]

    FEMP provides acquisition guidance for geothermal heat pumps, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  17. Microsoft PowerPoint - Purchasing Guidelines at CAMD.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BASICS OF BASICS OF PURCHASING AT CAMD CAMD Purchasing Reminders: 1.Request for Purchase Forms is 1.Request for Purchase Forms is mandatory , especially for: * University Stores University Stores * Petty cash * Purchases using a departmental credit * Purchases using a departmental credit card. Th i f ti id th * The more information you provide the less confusion and problems occur. Completed Request For Purchase Form Completed Request For Purchase Form Purchasing Reminders: 2 A P h F i 2. A

  18. Microsoft Word - Mid South and Southeast Wind Power Purchase...

    Broader source: Energy.gov (indexed) [DOE]

    Mid-South and Southeast Wind Power Purchase Agreements Utility Purchaser Power (MW) Wind Project Name Location (State) TVA 300 Cayuga Ridge Iowa TVA 198 Pioneer Prairie Iowa TVA ...

  19. Energy Department Receives EPA Award for Top Green Power Purchase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Receives EPA Award for Top Green Power Purchase Energy Department Receives EPA Award for Top Green Power Purchase September 24, 2013 - 12:19pm Addthis The Energy Department ...

  20. What Is Your Latest Energy Efficient Purchase? | Department of...

    Office of Environmental Management (EM)

    Is Your Latest Energy Efficient Purchase? What Is Your Latest Energy Efficient Purchase? February 10, 2011 - 6:30am Addthis On Tuesday, Andrea told us about her new door and the ...

  1. WPN 13-7: Vehicle and Equipment Purchases

    Broader source: Energy.gov [DOE]

    To provide Grantee with guidance on purchasing vehicles and equipment for use in the Weatherization Assistance Program (WAP).

  2. GovEnergy 2008 Session Presentation on Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy GovEnergy 2008 Session Presentation on Power Purchase Agreements GovEnergy 2008 Session Presentation on Power Purchase Agreements Presentation describes an overview of power purchase agreements given at GovEnergy 2008. The document includes several case studies and considerations for Federal agencies. Download the GovEnergy 2008 session presentation on power purchase agreements. (1.53 MB) More Documents & Publications GovEnergy 2008 Session Presentation on Power

  3. Contract Language for Energy-Consuming Product Purchases | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Products & Technologies » Energy-Efficient Products » Contract Language for Energy-Consuming Product Purchases Contract Language for Energy-Consuming Product Purchases Federal agencies are required to use specific contract language when purchasing energy-consuming products that are qualified by ENERGY STAR or designated by the Federal Energy Management Program (FEMP). See energy-efficient product purchasing requirements. Federal Acquisition Regulation Contract Language Federal

  4. DOE Princeton Plasma Physics Laboratory Purchase Power Agreement Request

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Proposal | Department of Energy Princeton Plasma Physics Laboratory Purchase Power Agreement Request for Proposal DOE Princeton Plasma Physics Laboratory Purchase Power Agreement Request for Proposal Document shows a purchase power agreement (PPA) request for proposal issued by DLA Energy on behalf of Princeton Plasma Physics Laboratory. Download the DOE Princeton Plasma Physics Laboratory purchase power agreement request for proposal. (348.79 KB) More Documents & Publications

  5. Purchase Card (P-Card) | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchasing Purchase Card (P-Card) Ames Laboratory uses the Government Services Administration (GSA) Smart Pay cards as a tool to simplify its small purchases and offers an alternative to the use of purchase orders. It also streamlines the acquisition process by reducing paperwork, improving lead times, and expediting supplier payments. Cardholders are required to abide by GSA, DOE and Ames Laboratory policies. Resources: Credit Card Approval Form - If you are interested in becoming a

  6. Self-Purchased Airline Tickets | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Self-Purchased Airline Tickets Self-Purchased Airline Tickets Conditions where you should not purchase your own ticket: Foreign travel Personal time mixed with business Personal destination mixed with business Rules: Travel advances will not be made to facilitate ticket purchases. Reimbursement must wait until the conclusion of the trip. If you do not take the trip you will not be reimbursed for the ticket. The lowest available fare is required by the contract. Insurance is not reimbursable.

  7. Lower Cost, Higher Performance Carbon Fiber

    Broader source: Energy.gov [DOE]

    Presented at the R&D Strategies for Compressed, Cryo-Compressed and Cryo-Sorbent Hydrogen Storage Technologies Workshops on February 14 and 15, 2011.

  8. Purchase Card Policies for Hq | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Procurement Services » Purchase Card Policies for Hq Purchase Card Policies for Hq HQ Procurement Services Policies & Operating Procedures Table of Contents PURPOSE RESPONSIBILITIES PERSONAL PROPERTY MANAGEMENT AND PROPERTY ACCOUNTABILITY ADDITIONAL PROHIBITIONS AND RESTRICTIONS PURCHASE CARD FINANCIAL PROCEDURES EMPLOYEES TRANSFERRING WITHIN HEADQUARTERS PROGRAM SUPPORT ADDITIONAL CARDHOLDER AND APPROVING OFFICIAL TRAINING USE OF PRIVATE SECTOR TEMPORARIES STRIPES Purpose To

  9. DOE Indian Energy Purchase Preference Policy Guidance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Indian Energy Purchase Preference Policy Guidance DOE Indian Energy Purchase Preference Policy Guidance PDF_FINAL DOE Indian Energy purchase preference policy guidance.pdf (266.84 KB) More Documents & Publications State Energy Program Notice 14-2, Implementation Model Guidance FY 2014-2024 Ten Year Site Plan Preparation Guidance Revised Guidance for Recruitment, Retention and Relocation Incentives

  10. Golden Reading Room: Office of Acquisition Documents, Small Purchases |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Small Purchases Golden Reading Room: Office of Acquisition Documents, Small Purchases Below are electronic versions of Golden Field Office Reading Room documents that were created after November 1, 1996, per the requirements of the Electronic Freedom of Information Act Amendment of 1996. Most documents are available in Adobe Acrobat Portable Document Format (PDF). Small Purchases

  11. Higher Education

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education Higher Education Higher Education Explore the multiple dimensions of a career at LANL: work with brilliant minds in an inclusive environment rich in intellectual...

  12. U.S. Department of Energy Hydrogen Storage Cost Analysis

    SciTech Connect (OSTI)

    Law, Karen; Rosenfeld, Jeffrey; Han, Vickie; Chan, Michael; Chiang, Helena; Leonard, Jon

    2013-03-11

    . In general, tank costs are the largest component of system cost, responsible for at least 30 percent of total system cost, in all but two of the 12 systems. Purchased BOP cost also drives system cost, accounting for 10 to 50 percent of total system cost across the various storage systems. Potential improvements in these cost drivers for all storage systems may come from new manufacturing processes and higher production volumes for BOP components. In addition, advances in the production of storage media may help drive down overall costs for the sodium alanate, SBH, LCH2, MOF, and AX-21 systems.

  13. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  14. Initial Application for FAC-C, Purchasing, Financial Assistance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Property Management Certification | Department of Energy Initial Application for FAC-C, Purchasing, Financial Assistance and Property Management Certification Initial Application for FAC-C, Purchasing, Financial Assistance and Property Management Certification Application Form (.pdf fillable) (76.53 KB) FAC-C Worksheet.xlsx (11.26 KB) Purchasing Worksheet (10.58 KB) CFA Worksheet (11.44 KB) Property Mgt Worksheet (11.15 KB) More Documents & Publications Systems and Professional

  15. Purchasing Energy-Efficient General Service Fluorescent Lamps | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Purchasing Energy-Efficient General Service Fluorescent Lamps Purchasing Energy-Efficient General Service Fluorescent Lamps The Federal Energy Management Program (FEMP) provides acquisition guidance for general service fluorescent lamps (GSFLs), a product category covered by FEMP efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR qualified or FEMP designated products in all product categories covered by these programs and in any

  16. Purchasing Energy-Efficient Suspended Fluorescent Luminaires | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Products & Technologies » Energy-Efficient Products » Purchasing Energy-Efficient Suspended Fluorescent Luminaires Purchasing Energy-Efficient Suspended Fluorescent Luminaires The Federal Energy Management Program (FEMP) provides acquisition guidance for suspended fluorescent luminaires, a product category covered by FEMP efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified or FEMP-designated products in all product

  17. Use of New Strategically Sourced Blanket Purchase Agreement for Domestic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Delivery Services with United Parcel Service | Department of Energy Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service The Department of Energy (DOE) is participating as an authorized user of the second generation General Services Administration (GSA) Blanket Purchase Agreement (BPA) GS-33F-BQV08 for Express

  18. When to Purchase Premium Efficiency Motors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    When to Purchase Premium Efficiency Motors Consider premium efficiency motors for new motor procurements when specifying motor-driven equipment, repairing or rewinding failed ...

  19. Power Purchase Agreement Checklist for State and Local Governments

    Broader source: Energy.gov [DOE]

    Provides a detailed guide to power purchase agreements for state and local governments including financial and contractual considerations. Author: National Renewable Energy Laboratory

  20. DOE Princeton Plasma Physics Laboratory Purchase Power Agreement...

    Broader source: Energy.gov (indexed) [DOE]

    for proposal issued by DLA Energy on behalf of Princeton Plasma Physics Laboratory. Download the DOE Princeton Plasma Physics Laboratory purchase power agreement request for ...

  1. Table 21. Domestic Crude Oil First Purchase Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    Administration Petroleum Marketing Annual 1996 41 Table 21. Domestic Crude Oil First Purchase Prices (Dollars per Barrel) - Continued Year Month PAD District II...

  2. Table 21. Domestic Crude Oil First Purchase Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    AdministrationPetroleum Marketing Annual 1998 41 Table 21. Domestic Crude Oil First Purchase Prices (Dollars per Barrel) - Continued Year Month PAD District II...

  3. Table 22. Domestic Crude Oil First Purchase Prices for Selected...

    U.S. Energy Information Administration (EIA) Indexed Site

    data. Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." 44 Energy Information AdministrationPetroleum Marketing Annual...

  4. Table 21. Domestic Crude Oil First Purchase Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    Administration Petroleum Marketing Annual 1995 41 Table 21. Domestic Crude Oil First Purchase Prices (Dollars per Barrel) - Continued Year Month PAD District II...

  5. Table 22. Domestic Crude Oil First Purchase Prices for Selected...

    U.S. Energy Information Administration (EIA) Indexed Site

    data. Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." 44 Energy Information Administration Petroleum Marketing Annual...

  6. Crude Oil Prices Table 21. Domestic Crude Oil First Purchase...

    U.S. Energy Information Administration (EIA) Indexed Site

    Information Administration Petroleum Marketing Annual 1995 41 Table 21. Domestic Crude Oil First Purchase Prices (Dollars per Barrel) - Continued Year Month PAD District II...

  7. Energy Department Announces Funding to Develop Aggregate Purchasing Models

    Broader source: Energy.gov [DOE]

    The Energy Department today announced up to $2 million to support aggregate purchasing models for plug-in electric and other alternative fuel and advanced technology vehicles, subsystems,...

  8. NREL-Third-Party Financing and Power Purchasing Agreements for...

    Open Energy Info (EERE)

    to: navigation, search Tool Summary LAUNCH TOOL Name: Third-Party Financing and Power Purchasing Agreements for Public Sector PV Projects AgencyCompany Organization: National...

  9. Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties Hurricane Sandy Contingency Operation -- ...

  10. Microsoft Word - Energy OIG Statement on Purchase Cards _May...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Idaho disclosed that a contractor project manager was allowed to approve and process his own purchase card orders. The investigation focused on an allegation that the...

  11. ,"Domestic Crude Oil First Purchase Prices by API Gravity"

    U.S. Energy Information Administration (EIA) Indexed Site

    API Gravity" ,"Click worksheet name or tab at bottom for data" ,"Worksheet ... Crude Oil First Purchase Prices by API Gravity",6,"Monthly","22016","10151993" ...

  12. Highly Insulating Windows Volume Purchase Program Final Report

    SciTech Connect (OSTI)

    Parker, Graham B.; Mapes, Terry S.; Zalis, WJ

    2013-02-01

    This report summarizes the Highly Insulating Windows Volume Purchase Program, conduced by PNNL for DOE-BTP, including a summary of outcomes and lessons learned.

  13. Purchasing Energy-Efficient Residential Gas Boilers | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gas Boilers Purchasing Energy-Efficient Residential Gas Boilers The Federal Energy Management Program (FEMP) provides acquisition guidance for residential gas boilers, a product ...

  14. Purchasing Energy-Efficient Residential Air Source Heat Pumps...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Air Source Heat Pumps Purchasing Energy-Efficient Residential Air Source Heat Pumps The Federal Energy Management Program (FEMP) provides acquisition guidance for residential air ...

  15. Purchasing Energy-Efficient Residential Central Air Conditioners...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Central Air Conditioners Purchasing Energy-Efficient Residential Central Air Conditioners The Federal Energy Management Program (FEMP) provides acquisition guidance for residential ...

  16. Purchasing Energy-Efficient Residential Electric Storage Water...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy-Efficient Residential Electric Storage Water Heaters Purchasing Energy-Efficient Residential Electric Storage Water Heaters The Federal Energy Management Program (FEMP) ...

  17. Purchasing Energy-Efficient Residential Solar Water Heaters ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Water Heaters Purchasing Energy-Efficient Residential Solar Water Heaters The Federal Energy Management Program (FEMP) provides acquisition guidance for residential solar ...

  18. Purchasing Energy-Efficient Residential Gas Storage Water Heaters...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gas Storage Water Heaters Purchasing Energy-Efficient Residential Gas Storage Water Heaters The Federal Energy Management Program (FEMP) provides acquisition guidance for ...

  19. Purchasing Energy-Efficient Residential Whole-Home Gas Tankless...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Whole-Home Gas Tankless Water Heaters Purchasing Energy-Efficient Residential Whole-Home Gas Tankless Water Heaters The Federal Energy Management Program (FEMP) provides ...

  20. Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal On-Site Renewable Power Purchase Agreements On-site renewable power ... to fund renewable energy projects with minimal ... Distributed Generation Projects: Webinar ...

  1. Table N11.4. Expenditures for Purchased Electricity, Natural...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... for which" "payment was not made, quantities purchased centrally within the company but separate" "from the reporting establishment, and quantities for which payment was made ...

  2. Table 7.10 Expenditures for Purchased Electricity, Natural Gas...

    Gasoline and Diesel Fuel Update (EIA)

    ... for which payment was not made, quantities purchased centrally within the company but separate from the reporting establishment, and quantities for which payment was made ...

  3. Appendix S-50 - Power Purchase Agreement (PPA) - Public Utilities...

    Open Energy Info (EERE)

    "http:en.openei.orgwindex.php?titleAppendixS-50-PowerPurchaseAgreement(PPA)-PublicUtilitiesCommission&oldid800827" Feedback Contact needs updating Image needs...

  4. Federal On-Site Renewable Power Purchasing Issues

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers on-site renewable power purchasing issues for federal facilities.

  5. ORNL Direct Purchase Information System (DPIS) user's manual. [For PDP-10

    SciTech Connect (OSTI)

    Grubb, J.W.; Lovin, J.K.; Smith, M.B.; Haese, R.L.; Needham, D.B.; Wilson, J.K.

    1980-08-01

    The ORNL Management Information System (MIS) Direct Purchase Information System (DPIS) is an on-line interactive system of computer programs. The system can provide a manager with commitment and delivery schedule information on current direct purchase requisitions. The commitment data accounts for the orders that have been placed and those requisitions yet to be placed with a vendor. Information can be summarized at many different levels, and individuals can quickly determine the status of their requisitions. DPIS contains data only on active outside direct purchases, but has the capability to access historical data. It provides sufficient flexibility to be used to answer many questions pertinent to the status of these direct purchases and their obligating costs. Even an inexperienced computer user should have little difficulty in learning to use DPIS. The User Module prompts the user on what type of response it is expecting. If the user has doubts as to the response, or if the meaning of the response is not clear, the module will give a detailed list of the options available at that level. The user has control of what data are to be considered, how they are to be grouped, and what format the output will take. As the user selects the options available at a given level, the module proceeds to the next lower level until sufficient input has been supplied to provide the requested information. A major benefit of this interactive, user-oriented system is that the manager can specify the information requirements and does not have to spend time going through a great deal of other data to locate what is needed. Because it is interactive, a search can begin at a summary level and then resort to a more detailed level if needed. DPIS allows the user direct control for selecting the type of commitment data, output, funds, and direct purchase.

  6. Higher Education

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education » Higher Education Higher Education Explore the multiple dimensions of a career at Los Alamos: work with brilliant minds in an inclusive environment rich in intellectual vitality and opportunities for growth. Contact Education Janelle Vigil-Maestas Community Partnerships Office (505) 665-4329 Email "The partnership between the Laboratory and regional colleges creates opportunities for students like me to attain challenging and rewarding careers." - Sherry Salas Bachicha

  7. Microsoft Word - CAMD Equipment PrePurchase Form.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Equipment Pre-purchase Form (Attach to purchase order) Requestor's Name______________________________________________________________ Requestor's Phone Number_______________________________________________________ Requestor's Initials/Supervisor's initials_____________________________________________ Has designated space been identified? Yes No Will any facility modifications be required? Yes No If yes, describe below Modifications to be completed

  8. Products and Services Purchased | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Products and Services ... Products and Services Purchased The following products and services are regularly purchased by Y-12: Computer hardware, software and supplies Electrical and electronic instruments and systems Mechanical equipment and supplies Laboratory, safety and operating products Environmental and waste management services Professional and administrative services Engineering support services Research & development Information technology Construction materials and services

  9. Higher Efficiency HVAC Motors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Higher Efficiency HVAC Motors 2016 Building Technologies Office Peer Review PJ Piper, pjpiper@qmpower.com CEO, QM Power, Inc. 2 Project Summary Timeline: Start date: 10/1/14 Planned end date: 9/30/16 Key Milestones 1. Target Application and Machine Specs; 2/13/15 2. Motor Design; 9/30/15 3. Build prototype; 3/31/16 4. Performance validation; 8/1/16 Budget: Total Project $ to Date: * DOE: $239,947 * Cost Share: $189,801 Total Project $: * DOE: $750,000 * Cost Share: $635,756 Key Partners: Project

  10. Process Equipment Cost Estimation, Final Report

    SciTech Connect (OSTI)

    H.P. Loh; Jennifer Lyons; Charles W. White, III

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  11. Managing inventory costs through joint procurement programs

    SciTech Connect (OSTI)

    Harlan, T.E. ); Williams, M.C. )

    1992-01-01

    Given current economic and regulatory challenges, utilities are facing the need to manage inventories more efficiently, lower spare parts costs, and reduce the downtime associated with equipment failure. Two programs helping utilities achieve these goals are the Joint Procurement Corporation (JPC) for multicompany purchase of common equipment and services and the pooled inventory management (PIM) program for joint purchase and storage of nuclear generating unit spare parts. Both of these are cooperative programs that decrease the probability of extended plant outages and reduce duplication of effort and/or inventory among participating utilities.

  12. Beyond pollution prevention: Managing life-cycle costs

    SciTech Connect (OSTI)

    Cohan, D.; Gess, D. )

    1993-01-01

    Companies that purchases and use chemicals and materials in their everyday operation are finding that disposing of these products is becoming increasingly expensive. These disposal and liability costs have been the motivating factor behind recent efforts at pollution prevention. This paper suggests an alternative approach: considering the full life-cycle costs of chemicals and materials at the time purchase decisions are made. Life-cycle cost is the sum of all the costs that a product is expected to incur from the time of its purchase, during its use, until the disposal of any wastes or by-products and beyond as long as liabilities may remain. It represents the product's real cost to the company, and as such is a better basis for making cost-effective decisions. By using life-cycle costs to make decisions, companies can prevent uneconomical decisions on potentially hazardous materials and more effectively minimize overall costs. Life-cycle cost management can also help in the formulation of pollution prevention plans by identifying cost-effective waste-reduction alternatives. Although the concepts of life-cycle cost management are straightforward and intuitive, applying these concepts to real decisions may be challenging. This paper presents an overview of life-cycle cost management, discusses some of the challenges companies face applying this approach to real decisions, and provides solutions that meet these challenges.

  13. DOE to Issue Second Solicitation for Purchase of Crude Oil for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve ...

  14. Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerhead...

    Office of Environmental Management (EM)

    Products & Technologies Energy-Efficient Products Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerheads, Toilets, and Urinals Purchasing Water-Efficient ...

  15. Timeline for HWMs and Above-RHWM Elections (2nd Purchase Period...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA updates contract with customer election for 4 th Purchase Period Source: Exhibit C, section 2 For Load Following customers, BPA updates contract with Tier 2 purchase and...

  16. Table A26. Total Quantity of Purchased Energy Sources by Census...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... purchased by a central purchasing office offsite, and quantities for" "which payment is made in-kind." " Source: Energy Information Administration, Office of Energy ...

  17. EERE Success Story-Plug and Play: Purchase, Install, and Connect...

    Energy Savers [EERE]

    Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours EERE Success Story-Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours ...

  18. City of Grand Rapids- Green Power Purchasing Policy

    Broader source: Energy.gov [DOE]

    In 2005, the City of Grand Rapids established a goal of purchasing 20% of its municipal power demand from renewable energy by 2008. In November 2007, the city signed a three-year agreement with a...

  19. Plug and Play: Purchase, Install, and Connect Residential Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photo Credit: Fraunhofer CSE Consumers may soon have the option of purchasing a do-it-yourself rooftop solar photovoltaic (PV) system at their local home improvement store that can ...

  20. Exploring Power Purchase Agreements- The Basics Part 1

    Broader source: Energy.gov [DOE]

    This webinar, held on July 27, 2011, provides information on the basics of Power Purchase Agreements, including risks and unique issues and benefits. Case studies include Salt Lake County, Utah, and Talbot County, Maryland.

  1. Moab Project Receives Award for Purchasing Environmentally Friendly...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project the highest level - the Gold Award - for achieving nine goals in five categories. ... To qualify for the Gold level, a site must purchase at least nine key products covering at ...

  2. Purchasing Energy-Efficient Windows | Department of Energy

    Office of Environmental Management (EM)

    Purchasing Energy-Efficient Windows October 13, 2008 - 11:29am Addthis John Lippert Windows connect us with the "great outdoors." They let in the light and the rays of the sun and ...

  3. The Solarize Guidebook: A community guide to collective purchasing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Solarize Guidebook: A community guide to collective purchasing of residential PV systems (Book), SunShot, U.S. Department of Energy (DOE) This guidebook is intended as a road ...

  4. Guide to Purchasing Green Power: Renewable Electricity, Renewable...

    Broader source: Energy.gov (indexed) [DOE]

    can consider to diversify their energy supply and reduce the environmental impact of their electricity use. Download the Guide to Purchasing Green Power. (1.97 MB) More Documents ...

  5. PPPL recognized for green electronics purchasing program | Princeton Plasma

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Lab recognized for green electronics purchasing program By Jeanne Jackson DeVoe May 6, 2015 Tweet Widget Google Plus One Share on Facebook Kyron Jones uses a forklift to lift a container of old electronic devices following the UNICOR electronics collection on Earth Day April 22. PPPL's received an environmental award for its program to purchase greener electronic devices and recycle and reuse electronics. (Photo by Photo by Elle Starkman/PPPL Office of Communications ) Kyron Jones

  6. Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certificates, and On-Site Renewable Generation | Department of Energy Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation Document describes renewable electricity, renewable energy certificates, and on-site renewable generation, which agencies and organizations can consider to diversify their energy supply and

  7. Energy Department Issues Tribal Renewable Energy Purchase Guidance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Development Resources | Department of Energy Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources December 5, 2012 - 4:40pm Addthis News Media Contact (202) 586-4940 WASHINGTON - At the White House Tribal Nations Conference today, the Energy Department announced two new initiatives aimed at driving increased energy production and sustainable economic development in

  8. Purchasing Energy-Efficient Ceiling-Mounted Fluorescent Luminaires |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Ceiling-Mounted Fluorescent Luminaires Purchasing Energy-Efficient Ceiling-Mounted Fluorescent Luminaires The Federal Energy Management Program (FEMP) provides acquisition guidance for ceiling-mounted fluorescent luminaires, a product category covered by FEMP efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified or FEMP-designated products in all product categories covered by these programs and in any acquisition

  9. Purchasing Energy-Efficient Commercial Boilers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boilers Purchasing Energy-Efficient Commercial Boilers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial boilers, a product category covered by FEMP-designated efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance and

  10. Purchasing Energy-Efficient Commercial Dishwashers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dishwashers Purchasing Energy-Efficient Commercial Dishwashers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial dishwashers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition

  11. Purchasing Energy-Efficient Commercial Fryers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fryers Purchasing Energy-Efficient Commercial Fryers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial fryers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance and

  12. Purchasing Energy-Efficient Commercial Gas Water Heaters | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Gas Water Heaters Purchasing Energy-Efficient Commercial Gas Water Heaters The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial gas water heaters (CWHs), a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically

  13. Purchasing Energy-Efficient Commercial Griddles | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Griddles Purchasing Energy-Efficient Commercial Griddles The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial griddles, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance

  14. Purchasing Energy-Efficient Commercial Ovens | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ovens Purchasing Energy-Efficient Commercial Ovens The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial ovens, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance and

  15. Purchasing Energy-Efficient Commercial Refrigerators and Freezers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Refrigerators and Freezers Purchasing Energy-Efficient Commercial Refrigerators and Freezers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial refrigerators and freezers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition

  16. Purchasing Energy-Efficient Commercial Steam Cookers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Steam Cookers Purchasing Energy-Efficient Commercial Steam Cookers The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial steam cookers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's

  17. Purchasing Energy-Efficient Commercial and Industrial LED Luminaires |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercial and Industrial LED Luminaires Purchasing Energy-Efficient Commercial and Industrial LED Luminaires The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial and industrial light emitting diode (LED) luminaires, a product category covered by FEMP efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified or FEMP-designated products in all product categories covered by these

  18. Purchasing Energy-Efficient Fluorescent Ballasts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fluorescent Ballasts Purchasing Energy-Efficient Fluorescent Ballasts The Federal Energy Management Program (FEMP) provides acquisition guidance for fluorescent ballasts, a product category covered by FEMP efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance and

  19. Purchasing Energy-Efficient Geothermal Heat Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Heat Pumps Purchasing Energy-Efficient Geothermal Heat Pumps The Federal Energy Management Program (FEMP) provides acquisition guidance for geothermal heat pumps, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law. FEMP's acquisition guidance and

  20. Purchasing Energy-Efficient Hot Food Holding Cabinets | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Hot Food Holding Cabinets Purchasing Energy-Efficient Hot Food Holding Cabinets The Federal Energy Management Program (FEMP) provides acquisition guidance for hot food holding cabinets, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically

  1. Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial central air conditioners (CACs). This equipment falls under the light commercial heating and cooling equipment product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies

  2. Purchasing Energy-Efficient Refrigerated Beverage Vending Machines |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Refrigerated Beverage Vending Machines Purchasing Energy-Efficient Refrigerated Beverage Vending Machines The Federal Energy Management Program (FEMP) provides acquisition guidance for refrigerated beverage vending machines, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any

  3. Purchasing Energy-Efficient Residential Central Air Conditioners |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Central Air Conditioners Purchasing Energy-Efficient Residential Central Air Conditioners The Federal Energy Management Program (FEMP) provides acquisition guidance for residential central air conditioners, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not

  4. Purchasing Energy-Efficient Residential Gas Storage Water Heaters |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Gas Storage Water Heaters Purchasing Energy-Efficient Residential Gas Storage Water Heaters The Federal Energy Management Program (FEMP) provides acquisition guidance for residential gas storage water heaters, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition

  5. Moab Project Receives Award for Purchasing Environmentally Friendly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Products | Department of Energy Receives Award for Purchasing Environmentally Friendly Products Moab Project Receives Award for Purchasing Environmentally Friendly Products February 26, 2014 - 12:00pm Addthis MOAB, Utah - EM's Moab Uranium Mill Tailings Remedial Action Project in Utah was one of three GreenBuy Award recipients for fiscal year 2013. DOE's Office of Sustainability Support awarded the Moab Project the highest level - the Gold Award - for achieving nine goals in five categories.

  6. Washington Lease Purchase Case Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington Lease Purchase Case Study Washington Lease Purchase Case Study Washington's Centralia School District pulled together several sources of funding to make $1.3 million in facilities improvements that reduced the school district's energy and water usage. Case study is excerpted from Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements. Author: Merrian Borgeson and Mark Zimring Washington Lease

  7. Cost-Benefit Analysis of Plug-in Hybrid Electric Vehicle Technology

    SciTech Connect (OSTI)

    Simpson, A.

    2006-11-01

    This paper presents a comparison of vehicle purchase and energy costs, and fuel-saving benefits of plug-in hybrid electric vehicles relative to hybrid electric and conventional vehicles.

  8. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  9. Non-Cost Barriers to Consumer Adoption of New Light-Duty Vehicle Technologies

    Broader source: Energy.gov [DOE]

    The rate of adoption of new vehicle technologies and related reductions in petroleum use and greenhouse gas emissions rely on how rapidly technology innovations enter the fleet through new vehicle purchases. New technologies often increase vehicle price, which creates a barrier to consumer purchase, but other barriers to adoption are not due to increased purchase prices. For example, plug-in vehicles, dedicated alternative fuel vehicles, and other new technologies face non-cost barriers such as consumer unfamiliarity or requirements for drivers to adjust behavior. This report reviews recent research to help classify these non-cost barriers and determine federal government programs and actions with the greatest potential to overcome them.

  10. Fact #879: June 29, 2015 Greenhouse Gas Abatement Costs for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employer-Subsidized Commuting Options | Department of Energy 9: June 29, 2015 Greenhouse Gas Abatement Costs for Employer-Subsidized Commuting Options Fact #879: June 29, 2015 Greenhouse Gas Abatement Costs for Employer-Subsidized Commuting Options Providing workplace charging is one of the more effective ways for businesses to reduce the greenhouse gas emissions of their employees' daily commute. Offering a bike purchase subsidy can be even more cost effective but may not be suitable for

  11. NREL: Hydrogen and Fuel Cells Research - Hydrogen Production Cost Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Production Cost Analysis NREL analyzed the cost of hydrogen production via wind-based water electrolysis at 42 potential sites in 11 states across the nation. This analysis included centralized plants producing the Department of Energy (DOE) target of 50,000 kg of hydrogen per day, using both wind and grid electricity. The use of wind and grid electricity can be balanced either by power or cost, including or excluding the purchase of peak summer electricity. Current wind incentives-such

  12. Energy and Cost Optimized Technology Options to Meet Energy Needs of Food Processors

    SciTech Connect (OSTI)

    Makhmalbaf, Atefe; Srivastava, Viraj; Hoffman, Michael G.; Wagner, Anne W.; Thornton, John

    2015-04-02

    ABSTRACT Combined cooling, heating and electric power (CCHP) distributed generation (DG) systems can provide electricity, heat, and cooling power to buildings and industrial processes directly onsite, while significantly increasing energy efficiency, security of energy supply, and grid independence. Fruit, vegetable, dairy and meat processing industries with simultaneous requirements for heat, steam, chilling and electricity, are well suited for the use of such systems to supply base-load electrical demand or as peak reducing generators with heat recovery in the forms of hot water, steam and/or chilled water. This paper documents results and analysis from a pilot project to evaluate opportunities for energy, emission, and cost for CCHP-DG and energy storage systems installed onsite at food processing facilities. It was found that a dairy processing plant purchasing 15,000 MWh of electricity will need to purchase 450 MWh with the integration of a 1.1 MW CCHP system. Here, the natural gas to be purchased increased from 190,000 MMBtu to 255,000 MMBtu given the fuel requirements of the CCHP system. CCHP systems lower emissions, however, in the Pacific Northwest the high percentage of hydro-power results in CO2 emissions from CCHP were higher than that attributed to the electric utility/regional energy mix. The value of this paper is in promoting and educating financial decision makers to seriously consider CCHP systems when building or upgrading facilities. The distributed generation aspect can reduce utility costs for industrial facilities and show non-wires solution benefits to delay or eliminate the need for upgrades to local electric transmission and distribution systems.

  13. PURCHASE ORDER Mission Support Alliance, LLC ATTN: ACCOUNTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PURCHASE ORDER Mission Support Alliance, LLC ATTN: ACCOUNTS PAYABLE MSIN: Gl-80 PO BOX 650 RICHLAND WA 99352 Purchase Order Revision Release Printed Page 00046630 Mail Invoice To: 07/28/2011 1 Please Direct Inquiries to: STEVEN S. MYRICK Vendor: Title: CONTRACTING OFFICER COLUMBIA RIGGING CORP PO BOX 2717 PASCO WA 99302 MOTOR FREIGHT - P FOB Point TRUCK MISC TRUCK DEST PREPAY AND ADD Payment Terms % ERS N Reference Contract FOB Days Net 30 Days Transit Type Carrier Name Primary Ship To: HANFORD

  14. Aggregated Purchasing and Workplace Charging Can Drive EV Market Growth |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Aggregated Purchasing and Workplace Charging Can Drive EV Market Growth Aggregated Purchasing and Workplace Charging Can Drive EV Market Growth November 24, 2014 - 11:06am Addthis Secretary of Energy Ernest Moniz with the utility industry's first plug-in electric hybrid drivetrain Class 5 bucket truck at the White House event on November 18, 2014. The truck, which is owned by Pacific Gas and Electric (PG&E), features up to 40 miles of all-electric range and

  15. BPA's Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  16. Purchasing Energy-Efficient Water-Cooled Ice Machines

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides efficiency requirements and acquisition guidance for water-cooled ice machines. Federal laws and requirements mandate that agencies purchase FEMP-designated products or ENERGY STAR-qualified products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  17. Purchasing Energy-Efficient Air-Cooled Ice Machines

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides acquisition guidance for air-cooled ice machines, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  18. Purchasing Energy-Efficient Residential Central Air Conditioners

    Broader source: Energy.gov [DOE]

    FEMP provides acquisition guidance for residential central air conditioners, a product category covered by ENERGY STAR. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  19. Purchasing Energy-Efficient Hot Food Holding Cabinets

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for hot food holding cabinets, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  20. ,"Domestic Crude Oil First Purchase Prices by Area"

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Offshore California Crude Oil First Purchase Price (Dollars per Barrel)" 27044,6.95 27075,6.87 27103,6.77 27134,6.77 27164,6.87 27195,6.85 27225,6.8 27256,6.71 27287,6.7 ...

  1. Purchasing Energy-Efficient Commercial Refrigerators and Freezers

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial refrigerators and freezers, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  2. Purchasing Energy-Efficient Commercial Gas Water Heaters

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial gas water heaters (CWHs), a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  3. Financial impacts of nonutility power purchases on investor-owned electric utilities

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities` cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA`s responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration.

  4. Using government purchasing power to reduce equipment standby power

    SciTech Connect (OSTI)

    Harris, Jeffrey; Meier, Alan; Bartholomew, Emily; Thomas, Alison; Glickman, Joan; Ware Michelle

    2003-03-03

    Although the government sector represents only 10 to 15 percent of the economy in most countries, carefully targeted public procurement can play a significant role in market transformation through its influence on both buyers and suppliers. Government leadership in energy-efficient purchasing can set an example for other buyers, while creating opportunities for leading manufacturers and distributors to increase their sales and market share by offering energy-efficient products at competitive prices. Under proper circumstances, a highly visible government purchasing policy can have a disproportionately large influence on the market for efficient products. In the United States, President Bush signed an Executive Order in 2001 directing all federal agencies to buy products with low standby power (1 watt or less where possible). This represents a deliberate choice to use government purchasing - rather than regulations or incentives - as a market-based strategy to encourage energy savings. It also builds upon existing efforts to encourage Federal purchase of energy-efficient products (Energy Star products and others in the top 25th percentile of efficiency). This paper summarizes the Federal Energy Management Program s first 18 months of experience in implementing this Executive Order, including analysis of data on standby power, interactions with manufacturers and industry groups, and the relationship between these efforts and other federal programs concerning product labelling, testing, rating, and efficiency standards. After five years of implementing low-standby power purchasing, we estimate energy savings for federal agencies alone at about 230 GWh/year (worth US$14 million), with spillover effects on the broader market that will save all US consumers nearly 4000 GWh/year (US$300 million).

  5. Load Leveling Battery System Costs

    Energy Science and Technology Software Center (OSTI)

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  6. DOE to Purchase Heating Oil for the Northeast Home Heating Oil...

    Energy Savers [EERE]

    Purchase Heating Oil for the Northeast Home Heating Oil Reserve DOE to Purchase Heating Oil for the Northeast Home Heating Oil Reserve June 23, 2008 - 1:29pm Addthis WASHINGTON, DC ...

  7. Purchasing and Materials Management Organization, Sandia National Laboratories annual report, fiscal year 1993

    SciTech Connect (OSTI)

    Martin, D.R.

    1994-02-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1993. Activities for both the New Mexico and California locations are included.

  8. Table 23. Domestic Crude Oil First Purchase Prices by API Gravity

    U.S. Energy Information Administration (EIA) Indexed Site

    18.62 19.26 Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." 23. Domestic Crude Oil First Purchase Prices by API Gravity Energy...

  9. Table 23. Domestic Crude Oil First Purchase Prices by API Gravity

    U.S. Energy Information Administration (EIA) Indexed Site

    20.23 20.91 Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." 23. Domestic Crude Oil First Purchase Prices by API Gravity Energy...

  10. Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers

    Broader source: Energy.gov [DOE]

    Document encourages Federal purchasers and suppliers to procure energy-efficient products to save energy and money. It includes information about purchasing requirements, compliance contracts, and how to determine if a product is compliant with requirements.

  11. Table 23. Domestic Crude Oil First Purchase Prices by API Gravity

    U.S. Energy Information Administration (EIA) Indexed Site

    reported. Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." Energy Information Administration Petroleum Marketing Annual...

  12. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies through the PPA evaluation and implementation process.

  13. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Financing » Renewable Energy Procurement » Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies

  14. Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy-Efficient Products A Guide for Federal Purchasers and Specifiers Effcient product purchases can really add up. In a single year, they could save the federal government almost a half billion dollars worth of energy. Every day, federal employees and contractors make choices about which products to buy. With each choice comes an opportunity to capture ongoing savings through the purchase of energy-effcient products. By purchasing products that exceed the minimum required effciency levels,

  15. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    SciTech Connect (OSTI)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle quality qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  16. NETL Nets Environmental Sustainability Purchasing Award | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News NETL Nets Environmental Sustainability Purchasing Award greenbuy-award.jpg A key U.S. Department of Energy (DOE) award recognizing outstanding achievement in procuring products that are healthier and environmentally friendly has been bestowed on the National Energy Technology Laboratory (NETL) for the second time in four years. NETL Director Dr. Grace Boheneck announced that the Laboratory will receive DOE's GreenBuy Award for its dedication to sustainable acquisition practices. The

  17. Low Standby Power Product Purchasing Requirements and Compliance Resources

    Broader source: Energy.gov [DOE]

    Federal agencies are required to purchase energy-consuming products with a standby power level of 1 watt or less, when compliant models are available on the market. To assist federal buyers in complying with this low standby power product requirement, the Federal Energy Management Program (FEMP) has identified priority product categories, which include products that consume relatively large amounts of energy and are prevalent in the federal sector.

  18. Boulder Valley School District (Colorado) Power Purchase Agreement Case Study

    Broader source: Energy.gov [DOE]

    Boulder Valley School District completed a power purchase agreement to install 1.4 MW of solar PV that are expected to reduce electricity bills in 14 schools by about 10% over the 20 year life of the agreement. Case study is excerpted from Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements. Author: Merrian Borgeson and Mark Zimring

  19. Purchasing Energy-Efficient Light Commercial Heating and Cooling Equipment

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides acquisition guidance for commercial central air conditioners (CACs). This equipment falls under the light commercial heating and cooling equipment product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition actions that are not specifically exempted by law.

  20. Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase

    National Nuclear Security Administration (NNSA)

    Agreements (BPAs) | National Nuclear Security Administration | (NNSA) Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) A BPA is a simplified method of filling anticipated repetitive needs for supplies or services by establishing acquisition vehicles with qualified sources of supply. BPAs are designed to leverage an ordering activity's buying power by taking advantage of quantity discounts, saving administrative time, and reducing paperwork. A BPA is

  1. Table A39. Total Expenditures for Purchased Electricity and Steam

    U.S. Energy Information Administration (EIA) Indexed Site

    9. Total Expenditures for Purchased Electricity and Steam" " by Type of Supplier, Census Region, Census Division, and" " Economic Characteristics of the Establishment, 1994" " (Estimates in Million Dollars)" ," Electricity",," Steam" ,,,,,"RSE" ,"Utility","Nonutility","Utility","Nonutility","Row" "Economic

  2. Solar power purchase for DOE laboratories | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Solar power purchase for DOE laboratories January 13, 2015 WASHINGTON D.C. -- The U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) announced today it has finalized the license agreement with Whitethorn Solar, a wholly owned subsidiary of Juwi Solar Inc. (Juwi), for a solar electrical generation system onsite at Lawrence Livermore National Laboratory. When completed, the power generated by this system will represent the DOE/NNSA's largest

  3. levelized costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    levelized costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  4. Table 7.6 Quantity of Purchased Energy Sources, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Quantity of Purchased Energy Sources, 2010; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources; Unit: Physical Units or Btu. Coke Residual Distillate Natural Gas(c) LPG and Coal and Breeze NAICS Total Electricity Fuel Oil Fuel Oil(b) (billion NGL(d) (million (million Other(e) Code(a) Subsector and Industry (trillion Btu) (million kWh) (million bbl) (million bbl) cu ft) (million bbl) short tons) short tons) (trillion Btu) Total United States 311 Food 1,108 75,652 2 4

  5. Table 7.9 Expenditures for Purchased Energy Sources, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Expenditures for Purchased Energy Sources, 2002;" " Level: National and Regional Data;" " Row: NAICS Codes; Column: Energy Sources;" " Unit: Million U.S. Dollars." " "," "," ",," "," "," "," "," "," "," "," ",," " " "," ",,,,,,,,,,"RSE" "NAICS"," ","

  6. Table 7.9 Expenditures for Purchased Energy Sources, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Expenditures for Purchased Energy Sources, 2010; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources; Unit: Million U.S. Dollars. NAICS Residual Distillate LPG and Coke Code(a) Subsector and Industry Total Electricity Fuel Oil Fuel Oil(b) Natural Gas(c) NGL(d) Coal and Breeze Other(e) Total United States 311 Food 10,111 5,328 130 431 3,391 150 442 29 210 3112 Grain and Oilseed Milling 2,130 932 2 12 673 Q 294 0 158 311221 Wet Corn Milling 1,002 352 1 5 296 1 239 0 107

  7. Power Purchase Agreement Checklist for State and Local Governments

    SciTech Connect (OSTI)

    Cory, K.; Canavan, B.; Koenig, R.

    2009-10-01

    This fact sheet provides information and guidance on the solar photovoltaic (PV) power purchase agreement (PPA), which is a financing mechanism that state and local government entities can use to acquire clean, renewable energy. It addressed the financial, logistical, and legal questions relevant to implementing a PPA, but we do not examine the technical details?those can be discussed later with the developer/contractor. This fact sheet is written to support decision makers in U.S. state and local governments who are aware of solar PPAs and may have a cursory knowledge of their structure but they still require further information before committing to a particular project.

  8. 2017 Levelized Costs AEO 2012 Early Release

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manufacturing activity in China continued to contract and volatility in Chinese financial ... purchasing managers' index: The Caixin China General Manufacturing Purchasing Managers' ...

  9. Audit of Department of Energy`s contractor liability insurance costs

    SciTech Connect (OSTI)

    1996-09-13

    Fifty-four of DOE`s major contractors reported expending $44.3 million in liability insurance costs for the last 3 years of operation. Purpose of this audit was to evaluate how DOE implemented its policy to assume the risk of losses for its contractors rather than to insure them commercially. Contractors are required to use self-insurance if combined annual premiums for commercial insurance exceed $10,000. Review of 18 major contractors showed that DOE was not consistently following its policy and that contractors using commercial insurance incurred higher costs. Required approvals were not always obtained prior to purchasing certain other types of liability insurance. It is recommended that DOE`s policies requiring self-insurance be fully implemented; that requests for approval for commercial insurance when annual premiums exceeded $10,000 be fully justified; and that the commercial insurance policies specifically define the liability coverage prior to approval and payment. It is also recommended that the contracts include clauses limiting reimbursements for insurance expenditures to actual losses and administrative costs.

  10. Table A31. Quantity of Electricity Sold to Utility and Nonutility Purchasers

    U.S. Energy Information Administration (EIA) Indexed Site

    Quantity of Electricity Sold to Utility and Nonutility Purchasers by Census Region," " Census Division, and Economic Characteristics of the Establishment, 1994" " (Estimates in Million Kilowatthours)" ,,,,"RSE" " "," ","Utility ","Nonutility","Row" "Economic Characteristics(a)","Total Sold","Purchaser(b)","Purchaser(c)","Factors" ,"Total United

  11. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Renewable Energy Procurement » Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land

  12. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land use agreements, and more.

  13. Purchasing Energy-Efficient Air-Cooled Ice Machines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Covered Product Categories » Purchasing Energy-Efficient Air-Cooled Ice Machines Purchasing Energy-Efficient Air-Cooled Ice Machines The Federal Energy Management Program (FEMP) provides acquisition guidance for air-cooled ice machines, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories covered by these programs and in any acquisition

  14. Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerheads,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Toilets, and Urinals | Department of Energy Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerheads, Toilets, and Urinals Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerheads, Toilets, and Urinals Federal agencies are required to purchase U.S. Environmental Protection Agency (EPA) WaterSense-labeled products where applicable. Faucets, pre-rinse spray valves, showerheads, toilets, and urinals are covered under the WaterSense program. The Federal Energy

  15. Los Alamos National Laboratory purchases nearly $1 billion in goods and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services last fiscal year Goods and services purchases Los Alamos National Laboratory purchases nearly $1 billion in goods and services last fiscal year The Laboratory also exceeded its goals for purchases made by small businesses in Northern New Mexico, the state and the country. December 6, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience,

  16. Inspection of Power Purchase Contracts at the Western Area Power Administration, IG-0372

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IG-1 INFORMATION: Report on the "Inspection of Power Purchase Contracts at the Western Area Power Administration" TO:The Secretary BACKGROUND: The subject final report is provided for your information. The Office of Inspector General received an allegation regarding possible irregularities in certain power purchase contracts awarded by the Western Area Power Administration. Based on our survey of Western's power purchase procedures, we expanded our allegation based inquiry to include

  17. DOE to Issue Second Solicitation for Purchase of Crude Oil for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Petroleum Reserve | Department of Energy Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve April 18, 2007 - 12:36pm Addthis Solicitation Issued for Up to Four Million Barrels WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it has issued the second of several solicitations planned to purchase up to four million barrels of

  18. Estimating the Cost and Energy Efficiency of a Solar Water Heater |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy the Cost and Energy Efficiency of a Solar Water Heater Estimating the Cost and Energy Efficiency of a Solar Water Heater Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR Solar water heating systems usually cost more to purchase and install than conventional water heating systems. However, a solar water heater can usually save you

  19. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  20. Table 7.4 Average Prices of Selected Purchased Energy Sources...

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Average Prices of Selected Purchased Energy Sources, 2002;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Energy Sources;" " ...

  1. Third Party Financing and Power Purchasing Agreements for Public Sector PV Projects

    Broader source: Energy.gov [DOE]

    This webinar, held on May 27, 2009, covers third-party financing and power purchase agreement for public sector photovoltaic projects, including economic and legal information.

  2. Third-Party Financing and Power Purchase Agreements for Public Sector PV Projects

    Broader source: Energy.gov [DOE]

    Provides an overview presentation of power purchase agreements, specifically as they relate to public sector solar photovoltaic projects. Author: National Renewable Energy Laboratory

  3. Table 11.6 Electricity: Sales to Utility and Nonutility Purchasers, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Electricity: Sales to Utility and Nonutility Purchasers, 2010; Level: National and Regional Data; Row: Values of Shipments and Employment Sizes; Column: Utility and Nonutility Purchasers; Unit: Million Kilowatthours. Total of Economic Sales and Utility Nonutility Characteristic(a) Transfers Offsite Purchaser(b) Purchaser(c) Total United States Value of Shipments and Receipts (million dollars) Under 20 194 100 93 20-49 282 280 3 50-99 1,115 922 194 100-249 5,225 4,288 936 250-499 5,595 2,696

  4. R-5 Highly-Insulating Windows and Low-e Storm Windows Volume Purchase Program

    SciTech Connect (OSTI)

    2009-09-30

    Introduces DOE's Building Technologies fenestration RD&D program, and describes the highly insulated R-5 Windows and Low-e Storm Windows Volume Purchase solicitation.

  5. Table 23. Domestic Crude Oil First Purchase Prices by API Gravity

    U.S. Energy Information Administration (EIA) Indexed Site

    17.18 17.64 Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." Energy Information AdministrationPetroleum Marketing Annual 1999...

  6. Table 23. Domestic Crude Oil First Purchase Prices by API Gravity

    U.S. Energy Information Administration (EIA) Indexed Site

    12.17 12.80 Source: Energy Information Administration, Form EIA-182, "Domestic Crude Oil First Purchase Report." Energy Information AdministrationPetroleum Marketing Annual 1998...

  7. Fact #683: July 11, 2011 Federal Tax Credits for the Purchase of Advanced

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Vehicles | Department of Energy 3: July 11, 2011 Federal Tax Credits for the Purchase of Advanced Technology Vehicles Fact #683: July 11, 2011 Federal Tax Credits for the Purchase of Advanced Technology Vehicles The Federal Government has encouraged the use of different transportation fuels by allowing tax credits on vehicle purchases. The purchase of a traditional (non-plug-in) hybrid vehicle was eligible for a tax credit of up to $3,400 from 2005 through 2010. Diesels, which are

  8. EIA-182, "Domestic Crude Oil First Purchase Report" Page 1 U...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... materials by following the steps below: * Go to EIA's ... If a firm's historical method of accounting for crude oil ... Purchases from production outside the three (3) mile limit ...

  9. Table 7.3 Average Prices of Purchased Electricity, Natural Gas...

    Gasoline and Diesel Fuel Update (EIA)

    ... for which payment was not made, quantities purchased centrally within the company but separate from the reporting establishment, and quantities for which payment was made ...

  10. Table 7.1 Average Prices of Purchased Energy Sources, 2010

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    ... for which payment was not made, quantities purchased centrally within the company but separate from the reporting establishment, and quantities for which payment was made ...

  11. Table N8.3. Average Prices of Purchased Electricity, Natural...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... for which" "payment was not made, quantities purchased centrally within the company but separate" "from the reporting establishment, and quantities for which payment was made ...

  12. Table 7.4 Average Prices of Selected Purchased Energy Sources...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    ... for which payment was not made, quantities purchased centrally within the company but separate from the reporting establishment, and quantities for which payment was made ...

  13. Energy Department Announces Funding to Access Higher Quality Wind Resources

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lower Costs | Department of Energy Access Higher Quality Wind Resources and Lower Costs Energy Department Announces Funding to Access Higher Quality Wind Resources and Lower Costs January 30, 2014 - 1:06pm Addthis The Energy Department today announced $2 million to help efficiently harness wind energy using taller towers. These projects will help strengthen U.S. wind turbine component manufacturing, reduce the cost of clean and renewable wind energy, and expand the geographic range of

  14. Cost Study Manual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a

  15. Third-Party Financing and Power Purchase Agreements for Public...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Author National Renewable Energy Laboratory may27thppaforpvwebinarjasoncoughlinnrel.ppt (588.5 KB) More Documents & Publications Third-Party Financing and Power ...

  16. Realistic costs of carbon capture

    SciTech Connect (OSTI)

    Al Juaied, Mohammed . Belfer Center for Science and International Affiaris); Whitmore, Adam )

    2009-07-01

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding

  17. On-Site Renewable Power Purchase Agreements for Renewable Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    An on-site renewable power purchase agreement (PPA) enables Federal agencies to fund a renewable energy project by contracting to purchase the power generated by the system. The renewable energy equipment is installed and owned by a developer but located on-site at the agency facility.

  18. Emission control cost-effectiveness of alternative-fuel vehicles

    SciTech Connect (OSTI)

    Wang, Q.; Sperling, D.; Olmstead, J.

    1993-06-14

    Although various legislation and regulations have been adopted to promote the use of alternative-fuel vehicles for curbing urban air pollution problems, there is a lack of systematic comparisons of emission control cost-effectiveness among various alternative-fuel vehicle types. In this paper, life-cycle emission reductions and life-cycle costs were estimated for passenger cars fueled with methanol, ethanol, liquefied petroleum gas, compressed natural gas, and electricity. Vehicle emission estimates included both exhaust and evaporative emissions for air pollutants of hydrocarbon, carbon monoxide, nitrogen oxides, and air-toxic pollutants of benzene, formaldehyde, 1,3-butadiene, and acetaldehyde. Vehicle life-cycle cost estimates accounted for vehicle purchase prices, vehicle life, fuel costs, and vehicle maintenance costs. Emission control cost-effectiveness presented in dollars per ton of emission reduction was calculated for each alternative-fuel vehicle types from the estimated vehicle life-cycle emission reductions and costs. Among various alternative-fuel vehicle types, compressed natural gas vehicles are the most cost-effective vehicle type in controlling vehicle emissions. Dedicated methanol vehicles are the next most cost-effective vehicle type. The cost-effectiveness of electric vehicles depends on improvements in electric vehicle battery technology. With low-cost, high-performance batteries, electric vehicles are more cost-effective than methanol, ethanol, and liquified petroleum gas vehicles.

  19. PAFC Cost Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell® 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ® FUEL CELL SYSTEM First cost 2010 cost reduction is being accomplished by incremental changes in technology & low cost sourcing Technology advances are required to reduce further cost and attain UTC Power's commercialization targets 2010 First unit 2010 Last unit Commercialization target Powerplant cost 4

  20. Using life-cycle cost management to cut costs and reduce waste

    SciTech Connect (OSTI)

    Gess, D.; Cohan, D.; McLearn, M.

    1995-12-01

    Increasing competition is forcing electric utility companies to reduce costs and improve efficiency. At the same time, increasing costs for waste disposal and emissions control and growing environmental regulatory pressure are providing powerful incentives for firms in virtually every industry to investigate opportunities to reduce or even eliminate the adverse environmental impacts associated with their operations. companies are also striving toward environmental stewardship to realize the potential benefits to the firms`s public image, employees, an shareholders. Motivated by these cost and environmental concerns, the Electric Power Research Institute (EPRI), Decision Focus Inc. (DFI), and a consortium of electric utility companies have developed techniques and tools to help electric utility companies to make purchase and operating decisions based on their full life-cycle costs, which explicitly include environmental, health, and safety costs. The process, called Life-Cycle Cost Management (LCCM), helps utilities to efficiently assemble the appropriate life-cycle information and bring it to bear on their business decisions. To date, several utilities have used LCCM to evaluate a range of product substitution and process improvement decisions and to implement cost-savings actions. This paper summarizes some of these applications.

  1. Purchasing Energy-Efficient Refrigerated Beverage Vending Machines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Future electricity price trends and a 3% discount rate are from Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis - 2015: Annual Supplement to NIST Handbook ...

  2. Table A21. Quantity of Electricity Sold to Utility and Nonutility Purchasers

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Quantity of Electricity Sold to Utility and Nonutility Purchasers" " by Census Region and Economic Characteristics of the Establishment, 1991" " (Estimates in Million Kilowatthours)" ,,,,"RSE" " "," ","Utility ","Nonutility","Row" "Economic Characteristics(a)","Total Sold","Purchaser(b)","Purchaser(c)","Factors" ,"Total United States",,, "RSE

  3. DOE Does Not Accept SPR Bids and Suspends Plans for Future Purchases |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SPR Bids and Suspends Plans for Future Purchases DOE Does Not Accept SPR Bids and Suspends Plans for Future Purchases May 2, 2007 - 12:45pm Addthis WASHINGTON, DC - The U.S. Department of Energy's Office of Fossil Energy has rejected all offers received from the second solicitation issued this spring that sought to purchase up to four million barrels of crude oil for the United States' crude oil reserve. Both solicitations resulted in no awards because the Department

  4. DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reserve | Department of Energy Solicitation for Purchase of Oil for the Strategic Petroleum Reserve DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum Reserve March 16, 2007 - 11:37am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will seek solicitations to purchase up to four million barrels of crude oil for the Strategic Petroleum Reserve (SPR). This is the first of a series of solicitations planned to replace 11 million barrels of

  5. Energy and Cost Optimized Technology Options to Meet Energy Needs of Food Processors

    SciTech Connect (OSTI)

    Makhmalbaf, Atefe; Srivastava, Viraj; Hoffman, Michael G.; Wagner, Anne W.; Thornton, John

    2015-05-01

    Full Paper Submission for: Combined cooling, heating and electric power (CCHP) distributed generation (DG) systems can provide electric power and, heating and cooling capability to commercial and industrial facilities directly onsite, while increasing energy efficiency, security of energy supply, grid independence and enhancing the environmental and economic situation for the site. Food processing industries often have simultaneous requirements for heat, steam, chilling and electricity making them well suited for the use of such systems to supply base-load or as peak reducing generators enabling reduction of overall energy use intensity. This paper documents analysis from a project evaluating opportunities enabled by CCHPDG for emission and cost reductions and energy storage systems installed onsite at food processing facilities. In addition, this distributed generation coupled with energy storage demonstrates a non-wires solution to delay or eliminate the need for upgrades to electric distribution systems. It was found that a dairy processing plant in the Pacific Northwest currently purchasing 15,000 MWh/yr of electricity and 190,000 MMBtu/yr of gas could be provided with a 1.1 MW CCHP system reducing the amount of electric power purchased to 450 MWh/yr while increasing the gas demand to 255,000 MMBtu/yr. The high percentage of hydro-power in this region resulted in CO2 emissions from CCHP to be higher than that attributed to the electric utility/regional energy mix. The value of this work is in documenting a real-world example demonstrating the value of CCHP to facility owners and financial decision makers to encourage them to more seriously consider CCHP systems when building or upgrading facilities.

  6. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  7. Fact #789: July 22, 2013 Comparison of State Incentives for Plug-In Electric Vehicle Purchases

    Broader source: Energy.gov [DOE]

    In addition to a Federal government tax credit up to $7,500, consumers who purchase plug-in electric vehicles (PEVs) may also receive state government incentives which are different for each state....

  8. El Paso Electric Company- Small and Medium System Renewable Energy Certificate Purchase Program

    Broader source: Energy.gov [DOE]

    Only systems connected to the utility's grid and net-metered are eligible. RECs will be measured by a separate REC meter and purchased by El Paso Electric on a monthly basis. For contracts signed...

  9. Third Party Financing and Power Purchasing Agreements for Public Sector PV Projects

    Broader source: Energy.gov [DOE]

    Provides information on third-party financing and Power Purchase Agreements for public sector PV projects presented at the TAP Web Seminar on May 27, 2009, includes economic and legal information.

  10. Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours

    Broader source: Energy.gov [DOE]

    Consumers may soon have the option of purchasing a do-it-yourself rooftop solar photovoltaic (PV) system at their local home improvement store that can be installed and connected to the grid in...

  11. Purchasing Water-Efficient Faucets, Pre-Rinse Spray Valves, Showerheads, Toilets, and Urinals

    Broader source: Energy.gov [DOE]

    Federal agencies are required to purchase U.S. Environmental Protection Agency (EPA) WaterSense-labeled products where applicable. Faucets, pre-rinse spray valves, showerheads, toilets, and urinals are covered under the WaterSense program.

  12. Fact #683: July 11, 2011 Federal Tax Credits for the Purchase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Leaf 2011 Nissan Leaf 2011 Smart For Two 2011 Smart For Two 2008-2010 Tesla Roadster 2008-2010 Tesla Roadster 2011 Wheego 2011 Wheego LiFe Hybrids 2005 - 2010 3,400 Purchases ...

  13. Utility to Purchase Electricity from Innovative DOE-Supported Clean Coal Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    An innovative clean coal technology project in Texas will supply electricity to the largest municipally owned utility in the United States under a recently signed Power Purchase Agreement, the U.S. Department of Energy announced today.

  14. Wind energy systems have low operating expenses because they have no fuel cost.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energy systems have low operating expenses because they have no fuel cost. Photo by Jenny Hager Photography, NREL 15990. 1. Wind energy is cost competitive with other fuel sources. The average levelized price of wind power purchase agree- ments signed in 2013 was approximately 2.5 cents per kilowatt-hour, a price that is not only cost competitive with new gas-fired power plants but also compares favorably to a range of fuel cost projections of gas-fired generation extending out through 2040. 1

  15. Concentrating Solar Panels: Bringing the Highest Power and Lowest Cost to the Rooftop

    SciTech Connect (OSTI)

    Michael Deck; Rick Russell

    2010-01-05

    Soliant Energy is a venture-capital-backed startup focused on bringing advanced concentrating solar panels to market. Our fundamental innovation is that we are the first company to develop a racking solar concentrator specifically for commercial rooftop applications, resulting in the lowest LCOE for rooftop electricity generation. Today, the commercial rooftop segment is the largest and fastest-growing market in the solar industry. Our concentrating panels can make a major contribution to the SAI's objectives: reducing the cost of solar electricity and rapidly deploying capacity. Our commercialization focus was re-shaped in 2009, shifting from an emphasis solely on panel efficiency to LCOE. Since the inception of the SAI program, LCOE has become the de facto standard for comparing commercial photovoltaic systems. While estimation and prediction models still differ, the emergence of performance-based incentive (PBI) and feed-in tariff (FIT) systems, as well as power purchase agreement (PPA) financing structures make LCOE the natural metric for photovoltaic systems. Soliant Energy has designed and demonstrated lower-cost, higher-power solar panels that consists of 6 (500X) PV module assemblies utilizing multi-junction cells and an integrated two-axis tracker. In addition, we have designed and demonstrated a prototype 1000X panel assembly with 8. Cost reductions relative to conventional flat panel PV systems were realized by (1) reducing the amount of costly semiconductor material and (2) developing strategies and processes to reduce the manufacturing costs of the entire system. Performance gains against conventional benchmarks were realized with (1) two-axis tracking and (2) higher-efficiency multi-junction PV cells capable of operating at a solar concentration ratio of 1000X (1000 kW/m2). The program objectives are: (1) Develop a tracking/concentrating solar module that has the same geometric form factor as a conventional flat, roof mounted photovoltaic (PV) panel

  16. Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager JSA Mentor-Protégé Program Thomas Jefferson National Accelerator Facility Newport, News, Virginia Danny Lloyd Supply Purchasing Manager JLab Small Business Program Manager JSA Mentor-Protégé Program * Jefferson Lab is managed and operated by Jefferson Science Associates, LLC, a joint venture between Southeastern Universities Research Association, Inc., and Computer Sciences Corporation Applied Technologies, LLC,

  17. Table 11.5 Electricity: Sales to Utility and Nonutility Purchasers, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Electricity: Sales to Utility and Nonutility Purchasers, 2002;" " Level: National and Regional Data; " " Row: NAICS Codes;" " Column: Utility and Nonutility Purchasers;" " Unit: Million Kilowatthours." " "," ",,,," " " "," ","Total of",,,"RSE" "NAICS"," ","Sales and","Utility","Nonutility","Row"

  18. Table 11.6 Electricity: Sales to Utility and Nonutility Purchasers, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    Electricity: Sales to Utility and Nonutility Purchasers, 2002;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Utility and Nonutility Purchasers;" " Unit: Million Kilowatthours." ,"Total of",,,"RSE" "Economic","Sales and","Utility","Nonutility","Row" "Characteristic(a)","Transfers

  19. Table 7.7 Quantity of Purchased Electricity, Natural Gas, and Steam, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Quantity of Purchased Electricity, Natural Gas, and Steam, 2010; Level: National and Regional Data; Row: NAICS Codes; Column: Supplier Sources of Purchased Electricity, Natural Gas, and Steam; Unit: Physical Units or Btu. Electricity Components Natural Gas Components Steam Components Electricity Natural Gas Steam Electricity from Sources Natural Gas from Sources Steam from Sources Electricity from Local Other than Natural Gas from Local Other than Steam from Local Other than NAICS Total

  20. Table E13.3. Electricity: Sales to Utility and Nonutility Purchasers, 1998

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Electricity: Sales to Utility and Nonutility Purchasers, 1998;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Utility and Nonutility Purchasers;" " Unit: Million Kilowatthours." ,"Total of",,,"RSE" "Economic","Sales and","Utility","Nonutility","Row" "Characteristic(a)","Transfers

  1. Table N13.3. Electricity: Sales to Utility and Nonutility Purchasers, 1998

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Electricity: Sales to Utility and Nonutility Purchasers, 1998;" " Level: National and Regional Data; " " Row: NAICS Codes;" " Column: Utility and Nonutility Purchasers;" " Unit: Million Kilowatthours." " "," ",,,," " " "," ","Total of",,,"RSE" "NAICS"," ","Sales and","Utility","Nonutility","Row"

  2. EERE Success Story-Plug and Play: Purchase, Install, and Connect

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Solar Power in Hours | Department of Energy Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours EERE Success Story-Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours March 16, 2015 - 5:58pm Addthis Fraunhofer CSE demonstrates Plug and Play PV System installation and commissioning in just 75 minutes at the Massachusetts Clean Energy Center’s Wind Technology Testing Center. Photo Credit: Fraunhofer CSE Fraunhofer CSE

  3. Purchasing Energy-Efficient Residential Whole-Home Gas Tankless Water

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heaters | Department of Energy Whole-Home Gas Tankless Water Heaters Purchasing Energy-Efficient Residential Whole-Home Gas Tankless Water Heaters The Federal Energy Management Program (FEMP) provides acquisition guidance for residential whole-home gas tankless water heaters, a product category covered by ENERGY STAR efficiency requirements. Federal laws and requirements mandate that agencies purchase ENERGY STAR-qualified products or FEMP-designated products in all product categories

  4. Activity Based Costing

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  5. Cellulosic Ethanol Cost Target

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plenary Talk May 21, 2013 Cellulosic Ethanol Cost Target 2 | Biomass Program ... "Our goal is to make cellulosic ethanol practical and cost competitive within 6 ...

  6. Costs of lithium-ion batteries for vehicles

    SciTech Connect (OSTI)

    Gaines, L.; Cuenca, R.

    2000-08-21

    One of the most promising battery types under development for use in both pure electric and hybrid electric vehicles is the lithium-ion battery. These batteries are well on their way to meeting the challenging technical goals that have been set for vehicle batteries. However, they are still far from achieving the current cost goals. The Center for Transportation Research at Argonne National Laboratory undertook a project for the US Department of Energy to estimate the costs of lithium-ion batteries and to project how these costs might change over time, with the aid of research and development. Cost reductions could be expected as the result of material substitution, economies of scale in production, design improvements, and/or development of new material supplies. The most significant contributions to costs are found to be associated with battery materials. For the pure electric vehicle, the battery cost exceeds the cost goal of the US Advanced Battery Consortium by about $3,500, which is certainly enough to significantly affect the marketability of the vehicle. For the hybrid, however, the total cost of the battery is much smaller, exceeding the cost goal of the Partnership for a New Generation of Vehicles by only about $800, perhaps not enough to deter a potential buyer from purchasing the power-assist hybrid.

  7. Life Cycle Cost Estimate

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  8. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  9. A chronicle of costs

    SciTech Connect (OSTI)

    Elioff, T.

    1994-04-01

    This report contains the history of all estimated costs associated with the superconducting super collider.

  10. Manufacturing Facility Opened Using EERE-Supported Low-Cost Fuel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    To accomplish this cost reduction, BASF developed a higher throughput coating process, ... Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles Low-Cost Production of ...

  11. Hydrogen Threshold Cost Calculation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing

  12. OOTW COST TOOLS

    SciTech Connect (OSTI)

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  13. Hydrogen Pathway Cost Distributions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric

  14. DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card

    Broader source: Energy.gov [DOE]

    Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures.

  15. Hurricane Sandy Contingency Operation-- Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy (DOE) Senior Procurement Executive (SPE) has increased the micro-purchase and simplified acquisition thresholds for Hurricane Sandy Contingency Operation.

  16. Life-cycle cost comparisons of advanced storage batteries and fuel cells for utility, stand-alone, and electric vehicle applications

    SciTech Connect (OSTI)

    Humphreys, K.K.; Brown, D.R.

    1990-01-01

    This report presents a comparison of battery and fuel cell economics for ten different technologies. To develop an equitable economic comparison, the technologies were evaluated on a life-cycle cost (LCC) basis. The LCC comparison involved normalizing source estimates to a standard set of assumptions and preparing a lifetime cost scenario for each technology, including the initial capital cost, replacement costs, operating and maintenance (O M) costs, auxiliary energy costs, costs due to system inefficiencies, the cost of energy stored, and salvage costs or credits. By considering all the costs associated with each technology over its respective lifetime, the technology that is most economical to operate over any given period of time can be determined. An analysis of this type indicates whether paying a high initial capital cost for a technology with low O M costs is more or less economical on a lifetime basis than purchasing a technology with a low initial capital cost and high O M costs. It is important to realize that while minimizing cost is important, the customer will not always purchase the least expensive technology. The customer may identify benefits associated with a more expensive option that make it the more attractive over all (e.g., reduced construction lead times, modularity, environmental benefits, spinning reserve, etc.). The LCC estimates presented in this report represent three end-use applications: utility load-leveling, stand-alone power systems, and electric vehicles.

  17. Direct/Indirect Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  18. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Annual Fuel Cost gal Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and ...

  19. NOTICE TO SUPPLIERS Fraudulent Quote Requests/Purchase Order E-Mail Activity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * The email message may be poorly written, with misspellings and awkward sentence structure. * The sender's email address is not the same as CNS standard email address domain. The email address domain for Y-12: xxx@y12.doe.gov, for Pantex: xxx@pantex.com. Email from either site may also be in this form: xxx@cns.doe.gov. * The message and purchase order requests shipment/delivery of products to non-CNS facilities. * The message will include an attachment that is designed to look like a purchase

  20. NOTICE TO SUPPLIERS Fraudulent Quote Requests/Purchase Order E-Mail Activity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

     The email message may be poorly written, with misspellings and awkward sentence structure.  The senders email address is not the same as CNS standard email address domain. The email address domain for Y-12: xxx@y12.doe.gov, for Pantex: xxx@pantex.com.  The message and purchase order requests shipment/delivery of products to non-CNS facilities.  The message will include an attachment that is designed to look like a purchase order, and includes a logo or other graphic, and a signature

  1. Federal Government Awards Multi-Agency Solar Power Purchase in California,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada | Department of Energy Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, 2015 - 10:30am Addthis The U.S. General Services Administration (GSA), in partnership with the U.S. Department of Energy, U.S. Environmental Protection Agency, and U.S. Forest Service, awarded a contract for the federal government's first-ever joint solar power procurement in California

  2. Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Green Power Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation DOE/EE-0307 This guide can be downloaded from: www1.eere.energy.gov/femp/technologies/renewable_purchasingpower.html www.epa.gov/greenpower/ www.wri.org/publications www.resource-solutions.org/publications.php Office of Air (6202J) EPA430-K-04-015 www.epa.gov/greenpower March 2010 ISBN: 1-56973-577-8 Guide to Purchasing Green Power i Table of Contents Summary

  3. Vehicle purchase and use data matrices: J. D. Power/DOE New Vehicle Owner Surveys

    SciTech Connect (OSTI)

    Crawford, R.; Dulla, R.

    1981-04-01

    Vehicle purchase and use data collected in two recent surveys from buyers of new 1978 and 1979 cars and light-duty trucks are presented. The survey information is broad in scope, extending from the public awareness of fuel economy information to decision-making in the purchase process, to in-use fuel economy. The survey data consequently have many applications in transportation studies. The objective of this report is to make a general summary of the data base contents available to interested individuals and organizations.

  4. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  5. Assessing the Battery Cost at Which Plug-In Hybrid Medium-Duty Parcel Delivery Vehicles Become Cost-Effective

    SciTech Connect (OSTI)

    Ramroth, L. A.; Gonder, J. D.; Brooker, A. D.

    2013-04-01

    The National Renewable Energy Laboratory (NREL) validated diesel-conventional and diesel-hybrid medium-duty parcel delivery vehicle models to evaluate petroleum reductions and cost implications of hybrid and plug-in hybrid diesel variants. The hybrid and plug-in hybrid variants are run on a field data-derived design matrix to analyze the effect of drive cycle, distance, engine downsizing, battery replacements, and battery energy on fuel consumption and lifetime cost. For an array of diesel fuel costs, the battery cost per kilowatt-hour at which the hybridized configuration becomes cost-effective is calculated. This builds on a previous analysis that found the fuel savings from medium duty plug-in hybrids more than offset the vehicles' incremental price under future battery and fuel cost projections, but that they seldom did so under present day cost assumptions in the absence of purchase incentives. The results also highlight the importance of understanding the application's drive cycle specific daily distance and kinetic intensity.

  6. Cost Contributors to Geothermal Power Production

    SciTech Connect (OSTI)

    Nathwani, Jay; Mines, Greg

    2011-07-01

    The US Department of Energy Geothermal Technologies Office (DOE-GTO) has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. Recently modifications to GETEM allow the DOE-GTO to better assess how different factors impact the generation costs, including initial project risk, time required to complete a development, and development size. The model characterizes the costs associated with project risk by including the costs to evaluate and drill those sites that are considered but not developed for commercial power generation, as well as to assign higher costs to finance those activities having more risk. This paper discusses how the important parameters impact the magnitude project costs for different project scenarios. The cost distributions presented include capital cost recovery for the exploration, confirmation, well field completion and power plant construction, as well as the operation and maintenance (O&M) costs. The paper will present these cost distributions for both EGS and hydrothermal resources.

  7. FEMP Offers Training on Federal On-Site Renewable Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    This refreshed eTraining core course provides federal energy and facility managers and contracting officers with up-to-date knowledge and best practices for developing an on-site renewable power purchase agreement (PPA) on a federal site and includes current definitions, references, and guidance to help launch or accelerate a PPA project.

  8. Highly Insulating R-5 Windows Volume Purchase - How Utilities Can Participate Fact Sheet

    SciTech Connect (OSTI)

    2010-03-01

    This fact sheet describes DOEs Windows Volume Purchase, the benefits of highly insulated R-5 windows and low-e storm windows, and the important role that utilities can play in expanding the market for these highly insulated windows.

  9. U.S. Residential Photovoltaic (PV) System Prices, Q4 2013 Benchmarks: Cash Purchase, Fair Market Value, and Prepaid Lease Transaction Prices

    SciTech Connect (OSTI)

    Davidson, C.; James, T. L.; Margolis, R.; Fu, R.; Feldman, D.

    2014-10-01

    The price of photovoltaic (PV) systems in the United States (i.e., the cost to the system owner) has dropped precipitously in recent years, led by substantial reductions in global PV module prices. This report provides a Q4 2013 update for residential PV systems, based on an objective methodology that closely approximates the book value of a PV system. Several cases are benchmarked to represent common variation in business models, labor rates, and module choice. We estimate a weighted-average cash purchase price of $3.29/W for modeled standard-efficiency, polycrystalline-silicon residential PV systems installed in the United States. This is a 46% decline from the 2013-dollar-adjusted price reported in the Q4 2010 benchmark report. In addition, this report frames the cash purchase price in the context of key price metrics relevant to the continually evolving landscape of third-party-owned PV systems by benchmarking the minimum sustainable lease price and the fair market value of residential PV systems.

  10. Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Broader source: Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  11. Temporary Waiver of Mandatory Use of Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Broader source: Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. This issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  12. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  13. Cost analysis guidelines

    SciTech Connect (OSTI)

    Strait, R.S.

    1996-01-10

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  14. substantially reduced production costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    production costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy ...

  15. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  16. Low Cost, Durable Seal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * ...

  17. Workplace Charging Installation Costs

    Broader source: Energy.gov [DOE]

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  18. Simple Modular LED Cost Model

    Broader source: Energy.gov [DOE]

    The LED Cost Model, developed by the DOE Cost Modeling Working Group, provides a simplified method for analyzing the manufacturing costs of an LED package. The model focuses on the major cost...

  19. 2011 Cost of Wind Energy Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... LCOE values reported here are expected to be greater than negotiated contract prices for wind power, as reflected by recent power purchase agreements. This is because recent power ...

  20. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  1. Decommissioning Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  2. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    SciTech Connect (OSTI)

    Zaeh, R.A.

    1993-04-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.

  3. Preferential right of purchase issues in oil and gas property sales

    SciTech Connect (OSTI)

    Christiansen, M.D.

    1996-09-01

    The business of buying and selling producing oil and gas properties has been active over the past decade. On frequently encountered difficulty is that many producing properties are subject to operating agreements containing `preferential right of purchase` PRP provisions, also referred to as rights of first refusal or preemptive rights. Under a PRP clause, a party wanting to sell its interest must first provide notice to other parties to the operating agreement and an opportunity to acquire the sellers rights and interests in the property. Determining if a PRP clause applies to a particular transaction and the extent of such application is not always easy. In addition if the PRP clause does apply and the holder elects to purchase the property, the deal for which the buyer and seller have bargained may be frustrated. Topics covered in this article include the following: scope of `sales` covered by the PRP clause; exclusion from preferential right; events triggering the PRP provision.

  4. Using Renewable Energy Purchases to Achieve Institutional Carbon Goals. A Review of Current Practices and Considerations.

    SciTech Connect (OSTI)

    Bird, Lori; Sumner, Jenny

    2011-01-01

    With organizations and individuals increasingly interested in accounting for their carbon emissions, greater attention is being placed on how to account for the benefits of various carbon mitigation actions available to consumers and businesses. Generally, organizations can address their own carbon emissions through energy efficiency, fuel switching, on-site renewable energy systems, renewable energy purchased from utilities or in the form of renewable energy certificates (RECs), and carbon offsets. This paper explores the role of green power and carbon offsets in carbon "footprinting" and the distinctions between the two products. It reviews how leading greenhouse gas (GHG) reporting programs treat green power purchases and discusses key issues regarding how to account for the carbon benefits of renewable energy. It also discusses potential double counting if renewable energy generation is used in multiple markets.

  5. Using Renewable Energy Purchases to Achieve Institutional Carbon Goals. A Review of Current Practices and Considerations

    SciTech Connect (OSTI)

    Bird, Lori; Sumner, Jenny

    2011-01-01

    With organizations and individuals increasingly interested in accounting for their carbon emissions, greater attention is being placed on how to account for the benefits of various carbon mitigation actions available to consumers and businesses. Generally, organizations can address their own carbon emissions through energy efficiency, fuel switching, on-site renewable energy systems, renewable energy purchased from utilities or in the form of renewable energy certificates (RECs), and carbon offsets. This paper explores the role of green power and carbon offsets in carbon footprinting and the distinctions between the two products. It reviews how leading greenhouse gas (GHG) reporting programs treat green power purchases and discusses key issues regarding how to account for the carbon benefits of renewable energy. It also discusses potential double counting if renewable energy generation is used in multiple markets.

  6. Using Renewable Energy Purchases to Achieve Institutional Carbon Goals: A Review of Current Practices and Considerations

    SciTech Connect (OSTI)

    Bird, L.; Sumner, J.

    2011-01-01

    With organizations and individuals increasingly interested in accounting for their carbon emissions, greater attention is being placed on how to account for the benefits of various carbon mitigation actions available to consumers and businesses. Generally, organizations can address their own carbon emissions through energy efficiency, fuel switching, on-site renewable energy systems, renewable energy purchased from utilities or in the form of renewable energy certificates (RECs), and carbon offsets. This paper explores the role of green power and carbon offsets in carbon footprinting and the distinctions between the two products. It reviews how leading greenhouse gas (GHG) reporting programs treat green power purchases and discusses key issues regarding how to account for the carbon benefits of renewable energy. It also discusses potential double counting if renewable energy generation is used in multiple markets.

  7. Cost and quality of fuels for electric utility plants: Energy data report. 1980 annual

    SciTech Connect (OSTI)

    Not Available

    1981-06-25

    In 1980 US electric utilities reported purchasng 594 million tons of coal, 408.5 million barrels of oil and 3568.7 billion ft/sup 3/ of gas. As compared with 1979 purchases, coal rose 6.7%, oil decreased 20.9%, and gas increased for the fourth year in a row. This volume presents tabulated and graphic data on the cost and quality of fossil fuel receipts to US electric utilities plants with a combined capacity of 25 MW or greater. Information is included on fuel origin and destination, fuel types, and sulfur content, plant types, capacity, and flue gas desulfurization method used, and fuel costs. (LCL)

  8. "Table A22. Total Quantity of Purchased Energy Sources by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Total Quantity of Purchased Energy Sources by Census Region," " Industry Group, and Selected Industries, 1991" " (Estimates in Btu or Physical Units)" ,,,,,,"Natural",,,"Coke" " "," ","Total","Electricity","Residual","Distillate","Gas(c)"," ","Coal","and Breeze"," ","RSE" "SIC","

  9. "Table A24. Total Expenditures for Purchased Energy Sources by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Total Expenditures for Purchased Energy Sources by Census Region," " Industry Group, and Selected Industries, 1991" " (Estimates in Million Dollars)" ,,,,,,,,,,,"RSE" "SIC"," "," "," ","Residual","Distillate ","Natural"," "," ","Coke"," ","Row" "Code(a)","Industry Groupsc and

  10. "Table A25. Average Prices of Selected Purchased Energy Sources by Census"

    U.S. Energy Information Administration (EIA) Indexed Site

    . Average Prices of Selected Purchased Energy Sources by Census" " Region, Industry Group, and Selected Industries, 1991: Part 1" " (Estimates in Dollars per Physical Unit)" ,,,,," " " "," "," ","Residual","Distillate","Natural Gas(c)"," "," ","RSE" "SIC"," ","Electricity","Fuel Oil","Fuel

  11. "Table A32. Total Quantity of Purchased Energy Sources by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    Quantity of Purchased Energy Sources by Census Region," " Census Division, Industry Group, and Selected Industries, 1994" " (Estimates in Btu or Physical Units)" ,,,,,,"Natural",,,"Coke" " "," ","Total","Electricity","Residual","Distillate","Gas(c)"," ","Coal","and Breeze"," ","RSE" "SIC","

  12. "Table A36. Total Expenditures for Purchased Energy Sources by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Total Expenditures for Purchased Energy Sources by Census Region," " Census Division, Industry Group, and Selected Industries, 1994" " (Estimates in Million Dollars)" ,,,,,,,,,,,"RSE" "SIC"," "," "," ","Residual","Distillate ","Natural"," "," ","Coke"," ","Row" "Code(a)","Industry Group and

  13. "Table A37. Total Expenditures for Purchased Energy Sources by Census Region,"

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Total Expenditures for Purchased Energy Sources by Census Region," " Census Division, and Economic Characteristics of the Establishment, 1994" " (Estimates in Million Dollars)" " "," "," "," ",," "," "," "," "," ","RSE" " "," "," ","Residual","Distillate","Natural"," ","

  14. "Table A38. Total Expenditures for Purchased Electricity, Steam, and Natural Gas"

    U.S. Energy Information Administration (EIA) Indexed Site

    8. Total Expenditures for Purchased Electricity, Steam, and Natural Gas" " by Type of Supplier, Census Region, Census Division, Industry Group," " and Selected Industries, 1994" " (Estimates in Million Dollars)" ,," Electricity",," Steam" ,,,,,,"RSE" "SIC",,"Utility","Nonutility","Utility","Nonutility","Row" "Code(a)","Industry Group and

  15. "Table A46. Total Expenditures for Purchased Electricity, Steam, and Natural"

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Total Expenditures for Purchased Electricity, Steam, and Natural" " Gas by Type of Supplier, Census Region, Industry Group, and Selected Industries," 1991 " (Estimates in Million Dollars)" ,," Electricity",," Steam",," Natural Gas" ,,"-","-----------","-","-----------","-","------------","-","RSE"

  16. "Table A47. Average Prices of Purchased Electricity, Steam, and Natural Gas"

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Average Prices of Purchased Electricity, Steam, and Natural Gas" " by Type of Supplier, Census Region, Industry Group, and Selected Industries," 1991 " (Estimates in Dollars per Physical Units)" ,," Electricity",," Steam",," Natural Gas" ,," (million kWh)",," (Billion BTU)",," (1000 cu ft)" ,"

  17. "Table E8.2. Average Prices of Selected Purchased Energy Sources, 1998;"

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Average Prices of Selected Purchased Energy Sources, 1998;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Energy Sources;" " Unit: U.S. Dollars per Million Btu." " ",," "," ",," "," ","RSE" "Economic",,"Residual","Distillate",,"LPG and",,"Row"

  18. Table 7.1 Average Prices of Purchased Energy Sources, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    Average Prices of Purchased Energy Sources, 2002;" " Level: National and Regional Data; " " Row: NAICS Codes;" " Column: All Energy Sources Collected;" " Unit: U.S. Dollars per Physical Units." ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Selected Wood and Other Biomass Components" ,,,,,,"Coal Components",,,"Coke",,,"Electricity Components",,,,,,,,,,,,,,"Natural Gas Components",,,"Steam Components"

  19. Table 7.2 Average Prices of Purchased Energy Sources, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Average Prices of Purchased Energy Sources, 2002;" " Level: National and Regional Data; " " Row: NAICS Codes; " " Column: All Energy Sources Collected;" " Unit: U.S. Dollars per Million Btu." ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Selected Wood and Other Biomass Components" ,,,,,,"Coal Components",,,"Coke",,,"Electricity Components",,,,,,,,,,,,,,"Natural Gas Components",,,"Steam Components"

  20. Table 7.2 Average Prices of Purchased Energy Sources, 2010;

    U.S. Energy Information Administration (EIA) Indexed Site

    Table 7.2 Average Prices of Purchased Energy Sources, 2010; Level: National and Regional Data; Row: NAICS Codes; Column: All Energy Sources Collected; Unit: U.S. Dollars per Million Btu. Selected Wood and Other Biomass Components Coal Components Coke Electricity Components Natural Gas Components Steam Components Total Wood Residues Bituminous Electricity Diesel Fuel Motor Natural Gas Steam and Wood-Related and Electricity from Sources and Gasoline Pulping Liquor Natural Gas from Sources Steam

  1. Table A18. Quantity of Electricity Sold to Utility and Nonutility Purchasers

    U.S. Energy Information Administration (EIA) Indexed Site

    8. Quantity of Electricity Sold to Utility and Nonutility Purchasers" " by Census Region, Industry Group, and Selected Industries, 1991" " (Estimates in Million Kilowatthours)" " "," "," "," "," ","RSE" "SIC"," "," ","Utility ","Nonutility","Row" "Code(a)","Industry Groups and Industry","Total

  2. Table A23. Quantity of Purchased Electricity, Steam, and Natural Gas by Type

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Quantity of Purchased Electricity, Steam, and Natural Gas by Type" " of Supplier, Census Region, Industry Group, and Selected Industries, 1991" " (Estimates in Btu or Physical Units)" ,," Electricity",," Steam",," Natural Gas" ,," (Million kWh)",," (Billion Btu)",," (Billion cu ft)" ,," -------------------------",," -------------------------",,"

  3. Table A30. Quantity of Electricity Sold to Utility and Nonutility Purchasers

    U.S. Energy Information Administration (EIA) Indexed Site

    Quantity of Electricity Sold to Utility and Nonutility Purchasers" " by Census Region, Census Division, Industry Group, and Selected Industries, 1994" " (Estimates in Million Kilowatthours)" " "," "," "," "," ","RSE" "SIC"," "," ","Utility ","Nonutility","Row" "Code(a)","Industry Group and Industry","Total

  4. Table N8.2. Average Prices of Purchased Energy Sources, 1998

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Average Prices of Purchased Energy Sources, 1998;" " Level: National and Regional Data; " " Row: NAICS Codes; Column: All Energy Sources Collected;" " Unit: U.S. Dollars per Million Btu." ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Selected","Wood and Other","Biomass","Components" ,,,,,,,"Coal Components",,,"Coke",,"Electricity","Components",,,,,,,,,,,,,"Natural

  5. The Business Case for Fuel Cells 2010: Why Top Companies are Purchasing Fuel Cells Today

    Broader source: Energy.gov (indexed) [DOE]

    The Business Case for Fuel Cells: Why Top Companies are Purchasing Fuel Cells Today September 2010 Authors and Acknowledgements This report was written and compiled by Sandra Curtin and Jennifer Gangi of Fuel Cells 2000, an activity of Breakthrough Technologies Institute in Washington, D.C., with assistance from Elizabeth Delmont. Support was provided by the U.S. Department of Energy's Fuel Cell Technologies Program. About this report In this report, we profile a select group nationally

  6. Processing Cost Analysis for Biomass Feedstocks

    SciTech Connect (OSTI)

    Badger, P.C.

    2002-11-20

    years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

  7. Soft Costs Fact Sheet

    Broader source: Energy.gov (indexed) [DOE]

    Energy SunShot Initiative is a collaborative national effort to make solar energy technologies cost-competitive with conventional forms of energy by the end of the decade. ...

  8. Estimating Renewable Energy Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  9. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select FuelTechnology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel ...

  10. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  11. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  12. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  13. Liquefaction and Pipeline Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for ... mile Downtown: 1 to 8 in. Downtown: 4 to 20 in. Urban H2A Right of Way Oil & Gas Journal

  14. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  15. System Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-03-27

    SCM is used for estimation of the life-cycle impacts (costs, health and safety risks) of waste management facilities for mixed low-level, low-level, and transuranic waste. SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at Department of Energy (DOE) installations. SCM also provides transportation costs for intersite transfer of DOE wastes. SCM covers the entire DOE waste management complex tomore » allow system sensitivity analysis including: treatment, storage, and disposal configuration options; treatment technology selection; scheduling options; transportation options; waste stream and volume changes; and site specific conditions.« less

  16. Workplace Charging Equipment Costs

    Broader source: Energy.gov [DOE]

    Charging stations are available from a variety of manufacturers in a range of models for all charging applications. For a single port charging station, Level 1 hardware costs range from $300-$1,500...

  17. Power Plant Cycling Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Intertek APTECH has organized the cycling cost data in consultation with NREL and WECC by the following eight generator plant types: 1. Small coal-fired sub-critical steam (35-299 ...

  18. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select Fuel/Technology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator Update Your Widget Code This widget version will stop working on March 31. Update your widget code. × Widget Code Select All Close U.S. Department of Energy Energy Efficiency and Renewable Energy

  19. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  20. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs » Soft Costs Soft Costs The U.S. Department of Energy (DOE) SunShot Initiative's soft costs program works to lower the non-hardware costs of solar and accelerate the adoption of solar energy technologies throughout the United States. In support of the SunShot Initiative goals, the soft costs program works in the following strategic areas: networking and technical assistance, data analysis, business innovation, and training. Soft Costs Activity Areas, Business Innovation, Networking

  1. Green Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    price or do not meet performance standards. Environmentally preferable means products or services that have a smaller effect on human health and the environment when compared with...

  2. Regional Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Partnerships Regional Partnerships DOE's Regional Carbon Sequestration Partnerships Program DOE has created a network of seven Regional Carbon Sequestration Partnerships (RCSPs) to help develop the technology, infrastructure, and regulations to implement large-scale CO2 storage (also called carbon sequestration) in different regions and geologic formations within the Nation. Collectively, the seven RCSPs represent regions encompassing: 97 percent of coal-fired CO2 emissions; 97 percent

  3. Higher crude oil prices contribute to higher summer gasoline prices

    U.S. Energy Information Administration (EIA) Indexed Site

    Higher crude oil prices contribute to higher summer gasoline prices The recent rise in crude oil prices will be passed on to consumers in the form of higher gasoline prices this summer but drivers will still find lower prices at the pump compared to what they paid last year. In its new monthly forecast, the U.S. Energy Information Administration said the retail price for regular-grade gasoline will average $2.27 per gallon this summer. That's 6 cents higher than previously forecast but still

  4. " Row: NAICS Codes;" " Column: Supplier Sources of Purchased Electricity, Natural Gas, and Steam;"

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Number of Establishments by Quantity of Purchased Electricity, Natural Gas, and Steam, 2006;" " Level: National Data; " " Row: NAICS Codes;" " Column: Supplier Sources of Purchased Electricity, Natural Gas, and Steam;" " Unit: Establishment Counts." ,,,"Electricity","Components",,,"Natural","Gas","Components",,"Steam","Components"

  5. Breakeven Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities (Report Summary) (Presentation)

    SciTech Connect (OSTI)

    Denholm, P.; Margolis, R. M.; Ong, S.; Roberts, B.

    2009-12-01

    "Break-even cost" for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this presentation, we introduce an analysis of PV break-even costs for residential customers in the United States, including an evaluation of some of the key drivers of PV breakeven both regionally and over time. This presentation includes our methodology and presents results for both near-term residential breakeven costs(2009) and future market sensitivities of break-even costs (2015). See also the the report "Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities". Presentation for NREL/TP-6A2-45991.

  6. Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities

    SciTech Connect (OSTI)

    Denholm, P.; Margolis, R. M.; Ong, S.; Roberts, B.

    2009-12-01

    Grid parity--or break-even cost--for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this report, we analyze PV break-even costs for U.S. residential customers. We evaluate some key drivers of grid parity both regionally and over time. We also examine the impact of moving from flat to time-of-use (TOU) rates, and we evaluate individual components of the break-even cost, including effect of rate structure and various incentives. Finally, we examine how PV markets might evolve on a regional basis considering the sensitivity of the break-even cost to four major drivers: technical performance, financing parameters, electricity prices and rates, and policies. We find that local incentives rather than ?technical? parameters are in general the key drivers of the break-even cost of PV. Additionally, this analysis provides insight about the potential viability of PV markets.

  7. Factory Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-12-17

    The Factory Cost Model (FCM) is an economic analysis tool intended to provide flat panel display (FPD) and other similar discrete component manufacturers with the ability to make first-order estimates of the cost of unit production. This software has several intended uses. Primary among these is the ability to provide first-order economic analysis for future factories. Consequently, the model requires a minimal level of input detail, and accomodates situations where actual production data are notmore » available. This software is designed to be activity based such that most of the calculated direct costs are associated with the steps of a manufacturibg process. The FCM architecture has the ability to accomodate the analysis of existing manufacturing facilities. The FCM can provide assistance with strategic economic decisions surrounding production related matters. For instance, the program can project the effect on costs and resources of a new product''s introduction, or it can assess the potential cost reduction produced by step yield improvements in the manufacturing process.« less

  8. EERE Success Story-Silicon Ink Technology Offers Path to Higher

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Solar Cells at Lower Cost | Department of Energy Silicon Ink Technology Offers Path to Higher Efficiency Solar Cells at Lower Cost EERE Success Story-Silicon Ink Technology Offers Path to Higher Efficiency Solar Cells at Lower Cost April 18, 2013 - 12:00am Addthis EERE Success Story—Silicon Ink Technology Offers Path to Higher Efficiency Solar Cells at Lower Cost Partnering with Sunnyvale-based Innovalight, which was acquired by DuPont in July 2011, EERE supported the

  9. Alternative windpower ownership structures: Financing terms and project costs

    SciTech Connect (OSTI)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  10. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect (OSTI)

    Kim, Karen; McGrath, Richard

    2013-07-01

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  11. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    costs program works to lower the non-hardware costs of ... data analysis, business innovation, and training. ... for as much as 64% of the total cost of a new solar system. ...

  12. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the tonnes of CO2 utilized. The costs of the process are to include infrastructure, raw materials, processing, byproduct disposal, and utilities costs, as well as any other costs....

  13. Low Cost, Durable Seal

    SciTech Connect (OSTI)

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  14. PROJECT PROFILE: Advanced Thermal Management for Higher Module Power Output

    Broader source: Energy.gov [DOE]

    Higher temperatures of photovoltaic (PV) modules are causing lower than projected module performance. For example, a free-standing Si PV module has 0.4% decrease in efficiency per degree Celsius. Reducing the module temperature to near ambient levels will increase yearly energy output by 8%. This project will enable lower operating temperatures for modules, resulting in higher module power output and lower levelized cost of electricity (LCOE).

  15. Turbine Cost Systems Engineering Model

    Energy Science and Technology Software Center (OSTI)

    2012-09-30

    turb_costSE is a set of models that link wind turbine component masses (and a few other key variables) to component costs.

  16. Effective Monday, November 23, 2009, the ANSER Center will process all purchase

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effective Monday, November 23, 2009, the ANSER Center will process all purchase orders funded using ANSER chart strings (containing Department ID 8286300). Please follow the procedures listed below. If you require access as a "Shopper" to Project Café, please complete the Project Cafe Security Access Form and e-mail a copy to Karolyn Godfrey. iBuy NU Orders: 1. Place order through iBuyNU, then please assign your shopping cart to Ria Hirsch, r-hirsch@northwestern.edu 2. If your order

  17. "Table A25 Average Prices of Selected Purchased Energy Sources by Census"

    U.S. Energy Information Administration (EIA) Indexed Site

    Average Prices of Selected Purchased Energy Sources by Census" " Region, Industry Group, and Selected Industries, 1991: Part 2" " (Estimates in Dollars per Million Btu)" ,,,,,,,,"RSE" "SIC"," "," ","Residual","Distillate"," "," "," ","Row" "Code(a)","Industry Groups and Industry","Electricity","Fuel Oil","Fuel

  18. "Table A28. Total Expenditures for Purchased Energy Sources by Census Region"

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Expenditures for Purchased Energy Sources by Census Region" " and Economic Characteristics of the Establishment, 1991" " (Estimates in Million Dollars)" " "," "," "," ",," "," "," "," "," ","RSE" " "," "," ","Residual","Distillate","Natural"," "," ","Coke","

  19. "Table E8.1. Average Prices of Selected Purchased Energy Sources, 1998;"

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Average Prices of Selected Purchased Energy Sources, 1998;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Energy Sources;" " Unit: U.S. Dollars per Physical Units." " ",," "," ",," "," " ,,"Residual","Distillate",,"LPG and",,"RSE" "Economic","Electricity","Fuel Oil","Fuel

  20. Table 7.5 Average Prices of Selected Purchased Energy Sources, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Average Prices of Selected Purchased Energy Sources, 2002;" " Level: National and Regional Data; " " Row: Values of Shipments and Employment Sizes;" " Column: Energy Sources;" " Unit: U.S. Dollars per Million Btu." " ",," "," ",," "," ","RSE" "Economic",,"Residual","Distillate","Natural ","LPG and",,"Row"

  1. Data sources directory for purchasing officials: Energy-efficient and environmentally preferred products

    SciTech Connect (OSTI)

    1995-09-01

    This Directory, produced by the New York State Energy Research and Development Authority, is an introduction to organizations that provide information about energy-efficient and environmentally preferred equipment and products. It is intended to be a reference tool for purchasing officials in the public and private sectors. The New York State Energy Research and Development Authority does not endorse any particular vendor, organization, or technology. This list was prepared to provide information. The companies listed may provide additional products and/or services not mentioned in this directory.

  2. Guide to purchasing green power. Renewable electricity, renewable energy certificates and on-site renewable generation

    SciTech Connect (OSTI)

    2004-09-30

    The Guide to Purchasing Green Power is intended for organizations that are considering the merits of buying green power as well as those that have decided to buy it and want help doing so. The Guide was written for a broad audience, including businesses, government agencies, universities, and all organizations wanting to diversify their energy supply and to reduce the environmental impact of their electricity use.The Guide provides an overview of green power markets and describes the necessary steps to buying green power. This section summarizes the Guide to help readers find the information they need.

  3. Tax Credits for Your Energy-Efficient Purchases | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Allison Casey Senior Communicator, NREL As April 15th draws nearer, no doubt taxes are on your mind. You may be wondering whether the recently passed American Recovery and Reinvestment Act (aka the "Recovery Act") will affect your taxes for 2008. While the IRS says that the tax provisions in the Recovery Act won't affect most people's 2008 tax returns, you may already be planning an energy-efficient purchase in 2009 that will be eligible for a tax credit. Back in October, I wrote about

  4. Microsoft Word - Purchase_Price_Allocations_White_Paper_7-9-15.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    505 9 th Street NW | Suite 800 | Washington DC 20004 | 202.862.0556 | www.seia.org July 2 015 Purchase Price Allocations for Solar Energy Systems for Financial Reporting Purposes 1 SEIA | www.seia.org Solar Energy Industries Association Celebrating i ts 4 1st a nniversary i n 2 015, t he S olar E nergy I ndustries A ssociation® i s t he n ational t rade a ssociation o f the U .S. s olar e nergy i ndustry. T hrough a dvocacy a nd e ducation, S EIA® i s b uilding a s trong s olar i ndustry t o p

  5. Heliostat cost reduction study.

    SciTech Connect (OSTI)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David; Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  6. Fuel Cell System for Transportation -- 2005 Cost Estimate

    SciTech Connect (OSTI)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of this

  7. Higher Education | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education » For Students & Educators » Higher Education Higher Education Chemist working in a laboratory. Students considering or planning for a career in a hydrogen- or fuel-cell-related field can use the resources below to read about available career opportunities, college programs that emphasis hydrogen and fuel cell research, and energy-related educational opportunities such as scholarships and internships. College-Level Materials - Textbooks and other reading materials for

  8. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  9. Levelized Power Generation Cost Codes

    Energy Science and Technology Software Center (OSTI)

    1996-04-30

    LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generationmore » cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor.« less

  10. Geothermal probabilistic cost study

    SciTech Connect (OSTI)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  11. Hydrogen and Infrastructure Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of Energy Fuel Cell Technologies Program Fuel Cells: Diverse Fuels and Applications More than $40 million from the 2009 American Recovery and Reinvestment Act to fund 12 projects to deploy up to 1,000 fuel cells Recovery Act Funding for Fuel Cells COMPANY AWARD APPLICATION Delphi Automotive $2.4 M Auxiliary Power FedEx

  12. Project Profile: High-Concentration, Low-Cost Parabolic Trough System for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Baseload CSP | Department of Energy Concentration, Low-Cost Parabolic Trough System for Baseload CSP Project Profile: High-Concentration, Low-Cost Parabolic Trough System for Baseload CSP SkyFuel logo SkyFuel, under the Baseload CSP FOA, developed an advanced, low-cost CSP collector using higher-concentration, higher-temperature, parabolic trough technology to substantially reduce the cost of baseload utility-scale solar power generation. Approach Overhead photo of horizontal metallic

  13. Overview of Commercial Building Partnerships in Higher Education

    SciTech Connect (OSTI)

    Schatz, Glenn

    2013-03-01

    Higher education uses less energy per square foot than most commercial building sectors. However, higher education campuses house energy-intensive laboratories and data centers that may spend more than this average; laboratories, in particular, are disproportionately represented in the higher education sector. The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems–including some considered too costly or technologically challenging–and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions.

  14. Department of Energy (DOE) Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card

    Broader source: Energy.gov [DOE]

    Department of Energy (DOE) Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card

  15. Cost Study Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Study Manual Cost Study Manual Update 62912. PDF icon Memo regarding Cost Study Manual PDF icon Cost Study Manual More Documents & Publications Contractor Human Resources ...

  16. On the Path to SunShot - Deployment and Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deployment and Costs On the Path to SunShot - Deployment and Costs On the Path to SunShot - Deployment and Costs In the On the Path to SunShot report series, the Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs report highlights how the cost of solar panels has decreased with technological improvements, which has resulted in higher levels of solar deployment

  17. COST OF ADDRESSING TARGETS OF UNEQUAL VALUE

    SciTech Connect (OSTI)

    G.H. CANAVAN

    2001-08-01

    The formalism for evaluating first strike costs and incentives for military targeting generalize to include higher value targets. That introduces two new allocations to the usual allocation between missiles and military targets, but they can be performed analytically. As the number of weapons on each side decreases, the optimal fraction of second strike weapons allocated to military values falls. The shift to high value targets is more pronounced below about 1,000 weapons for nominal parameters. Below 500 weapons the first striker's cost of action drops below its cost of inaction. A strike would induce a second strike of about 250 weapons on high value targets. An increase in the first striker's preference for damage to the other's high value targets increases or a decrease in its preference for preventing damage to its own high value targets decreases first strike costs and stability margins. Including defenses complicates allocations slightly. The main effect is increased attrition of second strikes, particularly at larger defenses, which makes it possible to significantly reduce damage to high value targets. At 1,000 weapons, by 300 to 400 interceptors the first striker's costs are reduced to 30% below that of inaction and the number of weapons delivered on the first striker's high value targets is reduced to about 100.

  18. Levelized cost and levelized avoided cost of new generation resources...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    3 The importance of the factors varies among the technologies. For technologies such as solar and wind generation that have no fuel costs and relatively small variable O&M costs,...

  19. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  20. Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... in higher yield and at lower cost than the incumbent CF made from specialty- grade PAN fber. ... that will require disciplined innovation. * High-volume production of advanced ...

  1. Cost effectiveness of the 1993 model energy code in New Jersey

    SciTech Connect (OSTI)

    Lucas, R.G.

    1995-09-01

    This is an analysis of cost effectiveness the Council of American Building Officials` 1993 Model Energy Code (MEC) building thermal-envelope requirements for single-family houses and multifamily housing units in New Jersey. Goal was to compare the cost effectiveness of the 1993 MEC to the alternate allowed in the 1993 Building Officials & Code Administrators (BOCA) National Energy Conservation Code -- American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 90A-1980 -- based on a comparison of the costs and benefits associated with complying with each. This comparison was performed for Camden, New Brunswick; Somerville, and Sparta. The analysis was done for two different scenarios: a ``move-up`` home buyer purchasing a single-family house and a ``first-time`` financially limited home buyer purchasing a multifamily unit. For the single-family home buyer, compliance with the 1993 MEC was estimated to increase first costs by $1028 to $1564, resulting in an incremental down payment increase of $206 to $313 (at 20% down). The time when the homeowner realizes net cash savings (net positive cash flow) for houses built in accordance with the 1993 MEC was from 1 to 5 years. The home buyer who paid 20% down had recovered increases in down payments and mortgage payments in energy cost savings by the end of the fifth year or sooner and thereafter will save more money each year. For the multifamily unit home buyer first costs were estimated to increase by $121 to $223, resulting in an incremental down payment increase of $12 to $22 (at 10% down). The time when the homeowner realizes net cash savings (net positive cash flow) for houses built in accordance with the 1993 MEC was 1 to 3 years.

  2. Table 5.18 Crude Oil Domestic First Purchase Prices, 1949-2011 (Dollars per Barrel)

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Crude Oil Domestic First Purchase Prices, 1949-2011 (Dollars per Barrel) Year Alaska North Slope California Texas U.S. Average Nominal 1 Real 2 Nominal 1 Real 2 Nominal 1 Real 2 Nominal 1 Real 2 1949 – – – – NA NA NA NA 2.54 17.52 [R] 1950 – – – – NA NA NA NA 2.51 17.13 [R] 1951 – – – – NA NA NA NA 2.53 16.10 [R] 1952 – – – – NA NA NA NA 2.53 15.83 [R] 1953 – – – – NA NA NA NA 2.68 16.57 [R] 1954 – – – – NA NA NA NA 2.78 17.03 [R] 1955 – – – – NA NA NA NA 2.77 16.69

  3. Overview of transparency issues under the US-Russian highly enriched uranium purchase agreement

    SciTech Connect (OSTI)

    Bieniawski, A.J.; Dougherty, D.R.

    1995-12-31

    The US has signed an Agreement with the Russian Federation for the purchase of 500 metric tons of highly enriched uranium (HEU) derived from dismantled Russian nuclear weapons. The BEU will be blended down to low-enriched uranium (LEU) in Russia and will be transported to the US to be used by fuel Fabricators to make fuel for commercial nuclear power plants. Both the United States and Russia have been preparing to institute transparency measures to provide confidence that the nonproliferation, physical protection, and material control and accounting requirements specified in the Agreement are met. This paper provides a background on the Agreement and subsequent on-going negotiations to develop transparency measures suited to the facilities and processes which are expected to be involved.

  4. Cost | OpenEI Community

    Open Energy Info (EERE)

    Cost Home Ocop's picture Submitted by Ocop(5) Member 15 July, 2014 - 07:07 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To...

  5. Wind Integration Cost and Cost-Causation: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  6. Life-Cycle Cost Analysis for Utility Combinations (LCCA) (for microcomputers). Software

    SciTech Connect (OSTI)

    Corin, N.

    1989-09-01

    The Life-Cycle Cost Analysis for Utility Combinations (LCCA) system evaluates housing project utility systems. The system determines the cost-effectiveness and aids in the selection of the utility combination with the lowest life-cycle cost. Because of the large number of possible combinations of fuels, purchasing methods, types of installations and utility rates, a systematic analysis of costs must be made. The choice of utilities may substantially influence construction cost. LCCA calculates initial and monthly costs of both individual dwelling units and project totals. Therefore, the LCCA system calculates costs for four combinations of fuel/energy. LCCA analyzes the following four utility combinations: Combination 1--Electricity; Combination 2--Electricity and Gas; Combination 3--Electricity and Oil; and Combination 4--Electricity, Gas and Oil. Software Description: The software is written in the Lotus 1-2-3 programming language for implementation on an IBM PC microcomputer using Lotus 1-2-3. Software requires 160K of disk storage, with a hard disk and one floppy or two floppy disk drives.

  7. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  8. Higher Power Energy LLC | Open Energy Information

    Open Energy Info (EERE)

    Higher Power Energy LLC Jump to: navigation, search Name: Higher Power Energy, LLC Place: Flower Mound, Texas Zip: 78028 Sector: Renewable Energy, Wind energy Product: Higher Power...

  9. Hydropower Baseline Cost Modeling

    SciTech Connect (OSTI)

    O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.; Chalise, Dol Raj; Centurion, Emma E.

    2015-01-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

  10. Low-Cost Illumination-Grade LEDs

    SciTech Connect (OSTI)

    Epler, John

    2013-08-31

    Solid State Lighting is a cost-effective, energy-conserving technology serving a rapidly expand- ing multi-billion dollar market. This program was designed to accelerate this lighting revolution by reducing the manufacturing cost of Illumination-Grade LEDs. The technical strategy was to investigate growth substrate alternatives to standard planar sapphire, select the most effective and compatible option, and demonstrate a significant increase in Lumen/$ with a marketable LED. The most obvious alternate substrate, silicon, was extensively studied in the first two years of the program. The superior thermal and mechanical properties of Si were expected to improve wavelength uniformity and hence color yield in the manufacture of high-power illumination- grade LEDs. However, improvements in efficiency and epitaxy uniformity on standard c-plane sapphire diminished the advantages of switching to Si. Furthermore, the cost of sapphire decreased significantly and the cost of processing Si devices using our thin film process was higher than expected. We concluded that GaN on Si was a viable technology but not a practical option for Philips Lumileds. Therefore in 2012 and 2013, we sought and received amendments which broadened the scope to include other substrates and extended the time of execution. Proprietary engineered substrates, off-axis (non-c-plane) sapphire, and c-plane patterned sapphire substrates (PSS) were all investigated in the final 18 months of this program. Excellent epitaxy quality was achieved on all three candidates; however we eliminated engineered substrates and non-c-plane sapphire because of their higher combined cost of substrate, device fabrication and packaging. Ultimately, by fabricating a flip-chip (FC) LED based upon c-plane PSS we attained a 42% reduction in LED manufacturing cost relative to our LUXEON Rebel product (Q1-2012). Combined with a flux gain from 85 to 102 Lm, the LUXEON Q delivered a 210% increase in Lm/$ over this time period. The

  11. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  12. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  13. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  14. Forage Harvest and Transport Costs

    SciTech Connect (OSTI)

    Butler, J.; Downing, M.; Turhollow, A.

    1998-12-01

    An engineering-economic approach is used to calculate harvest, in-field transport, and over-the-road transport costs for hay as bales and modules, silage, and crop residues as bales and modules. Costs included are equipment depreciation interest; fuel, lube, and oil; repairs; insurance, housing, and taxes; and labor. Field preparation, pest control, fertilizer, land, and overhead are excluded from the costs calculated Equipment is constrained by power available, throughput or carrying capacity, and field speed.

  15. Affordability and other factors affecting the purchase of energy-efficient manufactured homes

    SciTech Connect (OSTI)

    Hattrup, M.P.; Lee, A.D.; Sandahl, L.J.; Onisko, S.A.

    1993-06-01

    The Pacific Northwest Laboratory (PNL) and the Bonneville Power Administration (Bonneville) conducted this study to evaluate the manufactured home owner`s purchase decision process and to provide Bonneville with a better understanding of how consumers view a manufactured home`s affordability and energy efficiency. This study addresses manufactured homes built under the US Department of Housing and Urban Development (HUD) standards; these homes are sometimes referred to as HUD-code homes or mobile homes. Manufactured home owners in Idaho, Montana, Oregon, and Washington were included in this analysis. This report adds to the information presented in Sandahl et al. (1992), which discussed the practices of lenders, appraisers, and dealers -- all of whom play a key role in the manufactured home market due to the impact their practices have on the overall affordability of manufactured homes. This report focuses exclusively on the most important, and probably least understood, player -- the home buyer. The primary data were collected via a mail survey sent to 1,550 manufactured home owners in Idaho, Montana, Oregon, and Washington in late 1992. A 71% response rate was achieved; 1,106 usable responses were received. This study focuses on the Pacific Northwest but presents information that may be relevant to other parts of the country.

  16. PHEV Battery Cost Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    es_02_barnett.pdf (615.99 KB) More Documents & Publications PHEV Battery Cost Assessment PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment

  17. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet File Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template ...

  18. Hydrogen Pathway Cost Distributions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway Cost Distributions Hydrogen Pathway Cost Distributions Presentation on hydrogen pathway cost distributions presented January 25, 2006. PDF icon wkshpstorageuihlein.pdf...

  19. HTGR Cost Model Users' Manual

    SciTech Connect (OSTI)

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  20. Factors Affecting PMU Installation Costs

    Broader source: Energy.gov (indexed) [DOE]

    ... information to improve the modeling, forecasting and controls of the grid Standards ... Department of Energy |September 2014 Factors Affecting PMU Installation Costs | Page 3 ...

  1. Options to reduce the operating costs at fossil power stations

    SciTech Connect (OSTI)

    Mehl, L.; White, T.R.

    1998-12-31

    With the coming of deregulation in the electric power industry, existing power plants will have to evaluate options to reduce their operating costs in methods more commonly used in the industrial sector. Similar to organizations throughout the country, electrical generation companies are looking for ways to reduce their costs. The projected impact of figure deregulation on free enterprise production and trading have further emphasized this need. Historically, the ability to sell or dispatch electrical load based on economic advantages, has existed within local systems. Generating facilities with higher production costs must implement operating cost reductions or expect even lower capacity factors following deregulation. This paper examines various means to reducing operating costs and the methods used in their evaluation.

  2. Extreme Cost Reductions with Multi-Megawatt Centralized Inverter Systems

    SciTech Connect (OSTI)

    Schwabe, Ulrich; Fishman, Oleg

    2015-03-20

    The objective of this project was to fully develop, demonstrate, and commercialize a new type of utility scale PV system. Based on patented technology, this includes the development of a truly centralized inverter system with capacities up to 100MW, and a high voltage, distributed harvesting approach. This system promises to greatly impact both the energy yield from large scale PV systems by reducing losses and increasing yield from mismatched arrays, as well as reduce overall system costs through very cost effective conversion and BOS cost reductions enabled by higher voltage operation.

  3. Sensitivity Analysis of Offshore Wind Cost of Energy (Poster)

    SciTech Connect (OSTI)

    Dykes, K.; Ning, A.; Graf, P.; Scott, G.; Damiami, R.; Hand, M.; Meadows, R.; Musial, W.; Moriarty, P.; Veers, P.

    2012-10-01

    No matter the source, offshore wind energy plant cost estimates are significantly higher than for land-based projects. For instance, a National Renewable Energy Laboratory (NREL) review on the 2010 cost of wind energy found baseline cost estimates for onshore wind energy systems to be 71 dollars per megawatt-hour ($/MWh), versus 225 $/MWh for offshore systems. There are many ways that innovation can be used to reduce the high costs of offshore wind energy. However, the use of such innovation impacts the cost of energy because of the highly coupled nature of the system. For example, the deployment of multimegawatt turbines can reduce the number of turbines, thereby reducing the operation and maintenance (O&M) costs associated with vessel acquisition and use. On the other hand, larger turbines may require more specialized vessels and infrastructure to perform the same operations, which could result in higher costs. To better understand the full impact of a design decision on offshore wind energy system performance and cost, a system analysis approach is needed. In 2011-2012, NREL began development of a wind energy systems engineering software tool to support offshore wind energy system analysis. The tool combines engineering and cost models to represent an entire offshore wind energy plant and to perform system cost sensitivity analysis and optimization. Initial results were collected by applying the tool to conduct a sensitivity analysis on a baseline offshore wind energy system using 5-MW and 6-MW NREL reference turbines. Results included information on rotor diameter, hub height, power rating, and maximum allowable tip speeds.

  4. Analysis of Cycling Costs in Western Wind and Solar Integration Study

    SciTech Connect (OSTI)

    Jordan, G.; Venkataraman, S.

    2012-06-01

    The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

  5. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center (OSTI)

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  6. Use of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  7. Renewable Energy Cost Optimization Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2007-12-31

    The Software allow users to determine the optimum combination of renewable energy technologies to minimize life cycle cost for a facility by employing various algorithms which calculate initial and operating cost, energy delivery, and other attributes associated with each technology as a function of size.

  8. Electric power substation capital costs

    SciTech Connect (OSTI)

    Dagle, J.E.; Brown, D.R.

    1997-12-01

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  9. "Table A33. Total Quantity of Purchased Energy Sources by Census Region, Census Division,"

    U.S. Energy Information Administration (EIA) Indexed Site

    Quantity of Purchased Energy Sources by Census Region, Census Division," " and Economic Characteristics of the Establishment, 1994" " (Estimates in Btu or Physical Units)" ,,,,,"Natural",,,"Coke" " ","Total","Electricity","Residual","Distillate","Gas(c)"," ","Coal","and Breeze","Other(d)","RSE" "

  10. Higher Americium Oxidation State Research Roadmap (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Higher Americium Oxidation State Research Roadmap Citation Details In-Document Search Title: Higher Americium Oxidation State Research Roadmap The partitioning of ...

  11. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    SciTech Connect (OSTI)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  12. Break-Even Cost for Residential Solar Water Heating in the United States: Key Drivers and Sensitivities

    SciTech Connect (OSTI)

    Cassard, H.; Denholm, P.; Ong, S.

    2011-02-01

    This paper examines the break-even cost for residential rooftop solar water heating (SWH) technology, defined as the point where the cost of the energy saved with a SWH system equals the cost of a conventional heating fuel purchased from the grid (either electricity or natural gas). We examine the break-even cost for the largest 1,000 electric and natural gas utilities serving residential customers in the United States as of 2008. Currently, the break-even cost of SWH in the United States varies by more than a factor of five for both electricity and natural gas, despite a much smaller variation in the amount of energy saved by the systems (a factor of approximately one and a half). The break-even price for natural gas is lower than that for electricity due to a lower fuel cost. We also consider the relationship between SWH price and solar fraction and examine the key drivers behind break-even costs. Overall, the key drivers of the break-even cost of SWH are a combination of fuel price, local incentives, and technical factors including the solar resource location, system size, and hot water draw.

  13. Wind energy`s declining costs

    SciTech Connect (OSTI)

    Gipe, P.

    1995-11-01

    Wind energy is competitive with traditional energy sources for the first time since European windmills graced the landscapes of the Old World. This article explores the current economics of wind power. Topics discussed include the following: standardizing cost of energy reporting and the cost of wind energy; wind power plant price; maintenance costs; effect of installed cost on the cost of energy; future costs; decommissioning; modularity; social or environmental costs; cost of capital; bidding and price.

  14. Unreasonable Cost Waivers | Department of Energy

    Office of Environmental Management (EM)

    Unreasonable Cost Waivers Unreasonable Cost Waivers unreasonablecost10-03-2012.pdf cnmidecision.pdf eaglepassdecision.pdf...

  15. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  16. An Examination of Avoided Costs in Utah

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan

    2005-01-07

    The Utah Wind Working Group (UWWG) believes there are currently opportunities to encourage wind power development in the state by seeking changes to the avoided cost tariff paid to qualifying facilities (QFs). These opportunities have arisen as a result of a recent renegotiation of Pacificorp's Schedule 37 tariff for wind QFs under 3 MW, as well as an ongoing examination of Pacificorp's Schedule 38 tariff for wind QFs larger than 3 MW. It is expected that decisions made regarding Schedule 38 will also impact Schedule 37. Through the Laboratory Technical Assistance Program (Lab TAP), the UWWG has requested (through the Utah Energy Office) that LBNL provide technical assistance in determining whether an alternative method of calculating avoided costs that has been officially adopted in Idaho would lead to higher QF payments in Utah, and to discuss the pros and cons of this method relative to the methodology recently adopted under Schedule 37 in Utah. To accomplish this scope of work, I begin by summarizing the current method of calculating avoided costs in Utah (per Schedule 37) and Idaho (the ''surrogate avoided resource'' or SAR method). I then compare the two methods both qualitatively and quantitatively. Next I present Pacificorp's four main objections to the use of the SAR method, and discuss the reasonableness of each objection. Finally, I conclude with a few other potential considerations that might add value to wind QFs in Utah.

  17. Geothermal Exploration Cost and Time

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jenne, Scott

    2013-02-13

    The Department of Energy’s Geothermal Technology Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this cost and time metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration cost and time improvements can be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway: Geothermal). This paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open Energy Information website (OpenEI, http://en.openei.org) for public access. - Published 01/01/2013 by US National Renewable Energy Laboratory NREL.

  18. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    SciTech Connect (OSTI)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm.

  19. Cast Stone Formulation At Higher Sodium Concentrations

    SciTech Connect (OSTI)

    Fox, K. M.; Edwards, T. A.; Roberts, K. B.

    2013-10-02

    A low temperature waste form known as Cast Stone is being considered to provide supplemental Low Activity Waste (LAW) immobilization capacity for the Hanford site. Formulation of Cast Stone at high sodium concentrations is of interest since a significant reduction in the necessary volume of Cast Stone and subsequent disposal costs could be achieved if an acceptable waste form can be produced with a high sodium molarity salt solution combined with a high water to premix (or dry blend) ratio. The objectives of this study were to evaluate the factors involved with increasing the sodium concentration in Cast Stone, including production and performance properties and the retention and release of specific components of interest. Three factors were identified for the experimental matrix: the concentration of sodium in the simulated salt solution, the water to premix ratio, and the blast furnace slag portion of the premix. The salt solution simulants used in this study were formulated to represent the overall average waste composition. The cement, blast furnace slag, and fly ash were sourced from a supplier in the Hanford area in order to be representative. The test mixes were prepared in the laboratory and fresh properties were measured. Fresh density increased with increasing sodium molarity and with decreasing water to premix ratio, as expected given the individual densities of these components. Rheology measurements showed that all of the test mixes produced very fluid slurries. The fresh density and rheology data are of potential value in designing a future Cast Stone production facility. Standing water and density gradient testing showed that settling is not of particular concern for the high sodium compositions studied. Heat of hydration measurements may provide some insight into the reactions that occur within the test mixes, which may in turn be related to the properties and performance of the waste form. These measurements showed that increased sodium

  20. Cast Stone Formulation At Higher Sodium Concentrations

    SciTech Connect (OSTI)

    Fox, K. M.; Roberts, K. A.; Edwards, T. B.

    2013-09-17

    A low temperature waste form known as Cast Stone is being considered to provide supplemental Low Activity Waste (LAW) immobilization capacity for the Hanford site. Formulation of Cast Stone at high sodium concentrations is of interest since a significant reduction in the necessary volume of Cast Stone and subsequent disposal costs could be achieved if an acceptable waste form can be produced with a high sodium molarity salt solution combined with a high water to premix (or dry blend) ratio. The objectives of this study were to evaluate the factors involved with increasing the sodium concentration in Cast Stone, including production and performance properties and the retention and release of specific components of interest. Three factors were identified for the experimental matrix: the concentration of sodium in the simulated salt solution, the water to premix ratio, and the blast furnace slag portion of the premix. The salt solution simulants used in this study were formulated to represent the overall average waste composition. The cement, blast furnace slag, and fly ash were sourced from a supplier in the Hanford area in order to be representative. The test mixes were prepared in the laboratory and fresh properties were measured. Fresh density increased with increasing sodium molarity and with decreasing water to premix ratio, as expected given the individual densities of these components. Rheology measurements showed that all of the test mixes produced very fluid slurries. The fresh density and rheology data are of potential value in designing a future Cast Stone production facility. Standing water and density gradient testing showed that settling is not of particular concern for the high sodium compositions studied. Heat of hydration measurements may provide some insight into the reactions that occur within the test mixes, which may in turn be related to the properties and performance of the waste form. These measurements showed that increased sodium

  1. Cast Stone Formulation At Higher Sodium Concentrations

    SciTech Connect (OSTI)

    Fox, K. M.; Roberts, K. A.; Edwards, T. B.

    2014-02-28

    A low temperature waste form known as Cast Stone is being considered to provide supplemental Low Activity Waste (LAW) immobilization capacity for the Hanford site. Formulation of Cast Stone at high sodium concentrations is of interest since a significant reduction in the necessary volume of Cast Stone and subsequent disposal costs could be achieved if an acceptable waste form can be produced with a high sodium molarity salt solution combined with a high water to premix (or dry blend) ratio. The objectives of this study were to evaluate the factors involved with increasing the sodium concentration in Cast Stone, including production and performance properties and the retention and release of specific components of interest. Three factors were identified for the experimental matrix: the concentration of sodium in the simulated salt solution, the water to premix ratio, and the blast furnace slag portion of the premix. The salt solution simulants used in this study were formulated to represent the overall average waste composition. The cement, blast furnace slag, and fly ash were sourced from a supplier in the Hanford area in order to be representative. The test mixes were prepared in the laboratory and fresh properties were measured. Fresh density increased with increasing sodium molarity and with decreasing water to premix ratio, as expected given the individual densities of these components. Rheology measurements showed that all of the test mixes produced very fluid slurries. The fresh density and rheology data are of potential value in designing a future Cast Stone production facility. Standing water and density gradient testing showed that settling is not of particular concern for the high sodium compositions studied. Heat of hydration measurements may provide some insight into the reactions that occur within the test mixes, which may in turn be related to the properties and performance of the waste form. These measurements showed that increased sodium

  2. Cost Effective Water Heating Solutions

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question"Are high-efficiency hot water heating systems worth the cost?"

  3. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center (OSTI)

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  4. Sustainable Alternative Fuels Cost Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alternative Fuels Cost Workshop Tuesday, November 27, 2012 9:00 a.m. - 4:00 p.m. National Renewable Energy Lab Offices - Suite 930 901 D Street, SW, Washington, DC 20585 AGENDA ...

  5. Cost and Impacts of Policies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Impacts of Policies David L. Greene Paul N. Leiby ORNL David C. Bowman Econotech 2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure January 31, 2007 Washington, D.C. Plan of presentation: Brief review of HyTrans Calibration of FCV learning, scale, technological change Scenarios and Policies RESULTS 2010-2025 and long-run impacts 2010-2025 Government/Industry Costs Hydrogen production, infrastructure & cost HyTrans merges the early transition scenarios with

  6. Wind Electrolysis: Hydrogen Cost Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electrolysis: Hydrogen Cost Optimization Genevieve Saur and Todd Ramsden Technical Report NREL/TP-5600-50408 May 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Wind Electrolysis: Hydrogen Cost Optimization Genevieve Saur, Todd

  7. Low Cost Non-Reactive

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prepared: 10/28/09 Low Cost Non-Reactive Coating for Refractory Metals A non-reactive coating for refractory metals has been developed at The Ames Laboratory. Contamination of rare earth and reactive metals and their alloys has been a chronic problem that results from their interaction with the crucibles or other vessels used in high temperature processing or during other applications. As a consequence, processing and other costs are high due to the need to replace equipment or containers, or

  8. Electricity Generation Cost Simulation Model

    Energy Science and Technology Software Center (OSTI)

    2003-04-25

    The Electricity Generation Cost Simulation Model (GENSIM) is a user-friendly, high-level dynamic simulation model that calculates electricity production costs for variety of electricity generation technologies, including: pulverized coal, gas combustion turbine, gas combined cycle, nuclear, solar (PV and thermal), and wind. The model allows the user to quickly conduct sensitivity analysis on key variables, including: capital, O&M, and fuel costs; interest rates; construction time; heat rates; and capacity factors. The model also includes consideration ofmore » a wide range of externality costs and pollution control options for carbon dioxide, nitrogen oxides, sulfur dioxide, and mercury. Two different data sets are included in the model; one from the U.S. Department of Energy (DOE) and the other from Platt's Research Group. Likely users of this model include executives and staff in the Congress, the Administration and private industry (power plant builders, industrial electricity users and electric utilities). The model seeks to improve understanding of the economic viability of various generating technologies and their emission trade-offs. The base case results using the DOE data, indicate that in the absence of externality costs, or renewable tax credits, pulverized coal and gas combined cycle plants are the least cost alternatives at 3.7 and 3.5 cents/kwhr, respectively. A complete sensitivity analysis on fuel, capital, and construction time shows that these results coal and gas are much more sensitive to assumption about fuel prices than they are to capital costs or construction times. The results also show that making nuclear competitive with coal or gas requires significant reductions in capital costs, to the $1000/kW level, if no other changes are made. For renewables, the results indicate that wind is now competitive with the nuclear option and is only competitive with coal and gas for grid connected applications if one includes the federal production tax

  9. Emissions Scenarios, Costs, and Implementation Considerations of REDD Programs

    SciTech Connect (OSTI)

    Sathaye, Jayant; Andrasko, Ken; Chan, Peter

    2011-04-11

    Greenhouse gas emissions from the forestry sector are estimated to be 8.4 GtCO2-eq./year or about 17percent of the global emissions. We estimate that the cost forreducing deforestation is low in Africa and several times higher in Latin America and Southeast Asia. These cost estimates are sensitive to the uncertainties of how muchunsustainable high-revenue logging occurs, little understood transaction and program implementation costs, and barriers to implementation including governance issues. Due to lack of capacity in the affected countries, achieving reduction or avoidance of carbon emissions will require extensive REDD-plus programs. Preliminary REDD-plus Readiness cost estimates and program descriptions for Indonesia, Democratic Republic of the Congo, Ghana, Guyana and Mexico show that roughly one-third of potential REDD-plus mitigation benefits might come from avoided deforestation and the rest from avoided forest degradation and other REDD-plus activities.

  10. Insulating concrete forms: Installed cost and acoustic performance

    SciTech Connect (OSTI)

    1999-03-01

    The NAHB Research Center conducted a study to compare the cost and performance of Insulating Concrete Form (ICF) walls to conventional wood-frame exterior walls. This report contains the results of the cost study and sound transmission tests. Three home were built and monitored. One home has an ICF plank system, one has an ICF block system, and one is of conventional 2x4 lumber construction. The homes have identical floor plans and are located side by side. The findings indicate that the labor costs for the ICFs were slightly to moderately higher than the wood framing. However, the sound tests indicate that the ICF walls perform significantly better than the wood walls when no openings were present. The report summarizes the findings and recommends ways to increase the cost-effectiveness of ICFs.

  11. NUCLEAR ENERGY SYSTEM COST MODELING

    SciTech Connect (OSTI)

    Francesco Ganda; Brent Dixon

    2012-09-01

    The U.S. Department of Energys Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative Island approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this islands used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of

  12. Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project

    SciTech Connect (OSTI)

    Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

    1983-06-30

    A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

  13. States & Energy Efficiency in Higher Education

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assistance Program (TAP), provides information on States & Energy Efficiency in Higher Education.

  14. Residential, Commercial, and Utility-Scale Photovoltaic (PV) System Prices in the United States: Current Drivers and Cost-Reduction Opportunities

    SciTech Connect (OSTI)

    Goodrich, A.; James, T.; Woodhouse, M.

    2012-02-01

    The price of photovoltaic (PV) systems in the United States (i.e., the cost to the system owner) has dropped precipitously in recent years, led by substantial reductions in global PV module prices. However, system cost reductions are not necessarily realized or realized in a timely manner by many customers. Many reasons exist for the apparent disconnects between installation costs, component prices, and system prices; most notable is the impact of fair market value considerations on system prices. To guide policy and research and development strategy decisions, it is necessary to develop a granular perspective on the factors that underlie PV system prices and to eliminate subjective pricing parameters. This report's analysis of the overnight capital costs (cash purchase) paid for PV systems attempts to establish an objective methodology that most closely approximates the book value of PV system assets.

  15. The cost of silicon nitride powder: What must it be to compete?

    SciTech Connect (OSTI)

    Das, S.; Curlee, T.R.

    1992-02-01

    The ability of advanced ceramic components to compete with similar metallic parts will depend in part on current and future efforts to reduce the cost of ceramic parts. This paper examines the potential reductions in part cost that could result from the development of less expensive advanced ceramic powders. The analysis focuses specifically on two silicon nitride engine components -- roller followers and turbocharger rotors. The results of the process-cost models developed for this work suggest that reductions in the cost of advanced silicon nitride powder from its current level of about $20 per pound to about $5 per pound will not in itself be sufficient to lower the cost of ceramic parts below the current cost of similar metallic components. This work also examines if combinations of lower-cost powders and further improvements in other key technical parameters to which costs are most sensitive could push the cost of ceramics below the cost of metallics. Although these sensitivity analyses are reflective of technical improvements that are very optimistic, the resulting part costs are estimated to remain higher than similar metallic parts. Our findings call into question the widely-held notion that the cost of ceramic components must not exceed the cost of similar metallic parts if ceramics are to be competitive. Economic viability will ultimately be decided not on the basis of which part is less costly, but on an assessment of the marginal costs and benefits provided by ceramics and metallics. This analysis does not consider the benefits side of the equation. Our findings on the cost side of the equation suggest that the competitiveness of advanced ceramics will ultimately be decided by our ability to evaluate and communicate the higher benefits that advanced ceramic parts may offer.

  16. The cost of silicon nitride powder: What must it be to compete

    SciTech Connect (OSTI)

    Das, S.; Curlee, T.R.

    1992-02-01

    The ability of advanced ceramic components to compete with similar metallic parts will depend in part on current and future efforts to reduce the cost of ceramic parts. This paper examines the potential reductions in part cost that could result from the development of less expensive advanced ceramic powders. The analysis focuses specifically on two silicon nitride engine components -- roller followers and turbocharger rotors. The results of the process-cost models developed for this work suggest that reductions in the cost of advanced silicon nitride powder from its current level of about $20 per pound to about $5 per pound will not in itself be sufficient to lower the cost of ceramic parts below the current cost of similar metallic components. This work also examines if combinations of lower-cost powders and further improvements in other key technical parameters to which costs are most sensitive could push the cost of ceramics below the cost of metallics. Although these sensitivity analyses are reflective of technical improvements that are very optimistic, the resulting part costs are estimated to remain higher than similar metallic parts. Our findings call into question the widely-held notion that the cost of ceramic components must not exceed the cost of similar metallic parts if ceramics are to be competitive. Economic viability will ultimately be decided not on the basis of which part is less costly, but on an assessment of the marginal costs and benefits provided by ceramics and metallics. This analysis does not consider the benefits side of the equation. Our findings on the cost side of the equation suggest that the competitiveness of advanced ceramics will ultimately be decided by our ability to evaluate and communicate the higher benefits that advanced ceramic parts may offer.

  17. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  18. Cost Comparison for the Transfer of Select Calcined Waste Canisters to the Monitored Geologic Repository at Yucca Mountain, NV

    SciTech Connect (OSTI)

    Michael B. Heiser; Clark B. Millet

    2005-10-01

    This report performs a life-cycle cost comparison of three proposed canister designs for the shipment and disposition of Idaho National Laboratory high-level calcined waste currently in storage at the Idaho Nuclear Technology and Engineering Center to the proposed national monitored geologic repository at Yucca Mountain, Nevada. Concept A (2 10-ft) and Concept B (2 15-ft) canisters are comparable in design, but they differ in size and waste loading options and vary proportionally in weight. The Concept C (5.5 17.5-ft) canister (also called the super canister), while similar in design to the other canisters, is considerably larger and heavier than Concept A and B canisters and has a greater wall thickness. This report includes estimating the unique life-cycle costs for the three canister designs. Unique life-cycle costs include elements such as canister purchase and filling at the Idaho Nuclear Technology and Engineering Center, cask preparation and roundtrip consignment costs, final disposition in the monitored geologic repository (including canister off-loading and placement in the final waste disposal package for disposition), and cask purchase. Packaging of the calcine "as-is" would save $2.9 to $3.9 billion over direct vitrification disposal in the proposed national monitored geologic repository at Yucca Mountain, Nevada. Using the larger Concept C canisters would use 0.75 mi less of tunnel space, cost $1.3 billion less than 10-ft canisters of Concept A, and would be complete in 6.2 years.

  19. Cost-Causation and Integration Cost Analysis for Variable Generation

    SciTech Connect (OSTI)

    Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

    2011-06-01

    This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

  20. Hydrogen Threshold Cost Calculation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Threshold Cost Calculation Hydrogen Threshold Cost Calculation DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and assumptions used to calculate that threshold cost. 11007_h2_threshold_costs.pdf (443.22 KB) More Documents & Publications DOE Hydrogen and Fuel Cells Program Record 11007: Hydrogen Threshold Cost Calculation Fuel Cell Technologies Program Overview: 2010 Annual Merit Review and Peer Evaluation Meeting Fuel Cell Technologies

  1. Electric power substation capital costs (Technical Report) |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Subject: 24 POWER TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS Word Cloud More Like This ...

  2. California Biomass Collaborative Energy Cost Calculators | Open...

    Open Energy Info (EERE)

    Biomass Collaborative Energy Cost Calculators Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Biomass Collaborative Energy Cost Calculators AgencyCompany...

  3. Property:Cost | Open Energy Information

    Open Energy Info (EERE)

    Cost Jump to: navigation, search This is a property of type Number. Retrieved from "http:en.openei.orgwindex.php?titleProperty:Cost&oldid285418...

  4. Example Cost Codes for Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

  5. Benchmark the Fuel Cost of Steam Generation

    Broader source: Energy.gov [DOE]

    This tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  6. Examples of Cost Estimation Packages

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  7. Wind Electrolysis: Hydrogen Cost Optimization

    SciTech Connect (OSTI)

    Saur, G.; Ramsden, T.

    2011-05-01

    This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

  8. Mandatory Photovoltaic System Cost Estimate

    Broader source: Energy.gov [DOE]

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  9. Pollution prevention cost savings potential

    SciTech Connect (OSTI)

    Celeste, J.

    1994-12-01

    The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

  10. Regulatory cost-risk study

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  11. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    SciTech Connect (OSTI)

    Melaina, M.; Penev, M.

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  12. Are renewables portfolio standards cost-effective emission abatement policy?

    SciTech Connect (OSTI)

    Katerina Dobesova; Jay Apt; Lester B. Lave

    2005-11-15

    Renewables portfolio standards (RPS) could be an important policy instrument for 3P and 4P control. The authors examine the costs of renewable power, accounting for the federal production tax credit, the market value of a renewable credit, and the value of producing electricity without emissions of SO{sub 2}, NOx, mercury, and CO{sub 2}. The focus is on Texas, which has a large RPS and is the largest U.S. electricity producer and one of the largest emitters of pollutants and CO{sub 2}. The private and social costs of wind generation in an RPS is compared with the current cost of fossil generation, accounting for the pollution and CO{sub 2} emissions. It was found that society paid about 5.7 cents/kWh more for wind power, counting the additional generation, transmission, intermittency, and other costs. The higher cost includes credits amounting to 1.1 cents/kWh in reduced SO{sub 2}, NOx, and Hg emissions. These pollution reductions and lower CO{sub 2} emissions could be attained at about the same cost using pulverized coal (PC) or natural gas combined cycle (NGCC) plants with carbon capture and sequestration (CCS); the reductions could be obtained more cheaply with an integrated coal gasification combined cycle (IGCC) plant with CCS. 35 refs., 7 tabs.

  13. higher penetration of renewable energy sources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    higher penetration of renewable energy sources - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy ...

  14. DOE Connects with Higher Education Community

    Broader source: Energy.gov [DOE]

    EDUconnections is a year old project, and through it we celebrate our university partners, spotlighting a different higher education institution every month.

  15. Low Cost Hydrogen Production Platform

    SciTech Connect (OSTI)

    Timothy M. Aaron, Jerome T. Jankowiak

    2009-10-16

    A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was

  16. Cost-effectiveness of ASHRAE Standard 90.1-2010 Compared to ASHRAE Standard 90.1-2007

    SciTech Connect (OSTI)

    Thornton, Brian A.; Halverson, Mark A.; Myer, Michael; Cho, Hee Jin; Loper, Susan A.; Richman, Eric E.; Elliott, Douglas B.; Mendon, Vrushali V.; Rosenberg, Michael I.

    2013-06-18

    Pacific Northwest National Laboratory (PNNL) completed this project for the U.S. Department of Energy’s (DOE’s) Building Energy Codes Program (BECP). DOE’s BECP supports upgrading building energy codes and standards, and the states’ adoption, implementation, and enforcement of upgraded codes and standards. Building energy codes and standards set minimum requirements for energy-efficient design and construction for new and renovated buildings, and impact energy use and greenhouse gas emissions for the life of buildings. Continuous improvement of building energy efficiency is achieved by periodically upgrading energy codes and standards. Ensuring that changes in the code that may alter costs (for building components, initial purchase and installation, replacement, maintenance and energy) are cost-effective encourages their acceptance and implementation. ANSI/ASHRAE/IESNA Standard 90.1 is the energy standard for commercial and multi-family residential buildings over three floors.

  17. National Cost-effectiveness of ASHRAE Standard 90.1-2010 Compared to ASHRAE Standard 90.1-2007

    SciTech Connect (OSTI)

    Thornton, Brian; Halverson, Mark A.; Myer, Michael; Loper, Susan A.; Richman, Eric E.; Elliott, Douglas B.; Mendon, Vrushali V.; Rosenberg, Michael I.

    2013-11-30

    Pacific Northwest National Laboratory (PNNL) completed this project for the U.S. Department of Energy’s (DOE’s) Building Energy Codes Program (BECP). DOE’s BECP supports upgrading building energy codes and standards, and the states’ adoption, implementation, and enforcement of upgraded codes and standards. Building energy codes and standards set minimum requirements for energy-efficient design and construction for new and renovated buildings, and impact energy use and greenhouse gas emissions for the life of buildings. Continuous improvement of building energy efficiency is achieved by periodically upgrading energy codes and standards. Ensuring that changes in the code that may alter costs (for building components, initial purchase and installation, replacement, maintenance and energy) are cost-effective encourages their acceptance and implementation. ANSI/ASHRAE/IESNA Standard 90.1 is the energy standard for commercial and multi-family residential buildings over three floors.

  18. Novel, Low-Cost Nanoparticle Production

    SciTech Connect (OSTI)

    2011-05-31

    Fact sheet describing a modular hybrid plasma reactor and process to manufacture low-cost nanoparticles

  19. PEM Electrolyzer Incorporating an Advanced Low-Cost Membrane

    SciTech Connect (OSTI)

    Hamdan, Monjid

    2013-08-29

    The Department of Energy (DOE) has identified hydrogen production by electrolysis of water at forecourt stations as a critical technology for transition to the hydrogen economy; however, the cost of hydrogen produced by present commercially available electrolysis systems is considerably higher than the DOE 2015 and 2020 cost targets. Analyses of proton-exchange membrane (PEM) electrolyzer systems indicate that reductions in electricity consumption and electrolyzer stack and system capital cost are required to meet the DOE cost targets. The primary objective is to develop and demonstrate a cost-effective energy-based system for electrolytic generation of hydrogen. The goal is to increase PEM electrolyzer efficiency and to reduce electrolyzer stack and system capital cost to meet the DOE cost targets for distributed electrolysis. To accomplish this objective, work was conducted by a team consisting of Giner, Inc. (Giner), Virginia Polytechnic Institute & University (VT), and domnick hunter group, a subsidiary of Parker Hannifin (Parker). The project focused on four (4) key areas: (1) development of a high-efficiency, high-strength membrane; (2) development of a long-life cell-separator; (3) scale-up of cell active area to 290 cm2 (from 160 cm²); and (4) development of a prototype commercial electrolyzer system. In each of the key stack development areas Giner and our team members conducted focused development in laboratory-scale hardware, with analytical support as necessary, followed by life-testing of the most promising candidate materials. Selected components were then scaled up and incorporated into low-cost scaled-up stack hardware. The project culminated in the fabrication and testing of a highly efficient electrolyzer system for production of 0.5 kg/hr hydrogen and validation of the stack and system in testing at the National Renewable Energy Laboratory (NREL).

  20. Water Availability, Cost, and Use

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Availability, Cost, and Use - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  1. Support for Cost Analyses on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35 Hartwell Ave Lexington, MA 02421 Support for Cost Analyses on Solar-Driven High Temperature Thermochemical Water-Splitting Cycles Final Report to: Department of Energy Order DE-DT0000951 Report prepared by TIAX LLC Reference D0535 February 22, 2011 Matt Kromer (Principal Investigator) Kurt Roth Rosalind Takata Paul Chin Copyright 2011, TIAX LLC Notice: This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government

  2. Life cycle costing of waste management systems: Overview, calculation principles and case studies

    SciTech Connect (OSTI)

    Martinez-Sanchez, Veronica; Kromann, Mikkel A.

    2015-02-15

    impacts and the coverage of shadow prices, and there was also significant confusion regarding terminology. The presented cost model was implemented in two case study scenarios assessing the costs involved in the source segregation of organic waste from 100,000 Danish households and the subsequent co-digestion of organic waste with animal manure. Overall, source segregation resulted in higher financial costs than the alternative of incinerating the organic waste with the residual waste: 1.6 M€/year, of which 0.9 M€/year was costs for extra bins and bags used by the households, 1.0 M€/year for extra collections and −0.3 M€/year saved on incineration.

  3. Resonant radiation from oscillating higher order solitons

    SciTech Connect (OSTI)

    Driben, R.; Yulin, A. V.; Efimov, A.

    2015-07-15

    We present radiation mechanism exhibited by a higher order soliton. In a course of its evolution the higher-order soliton emits polychromatic radiation resulting in formation of multipeak frequency comb-like spectral band. The shape and spectral position of this band can be effectively controlled by the relative strength of the third order dispersion. An analytical description is corroborated by numerical simulations. Research showed that for longer pulses the described effect persists also under the action of higher order perturbations such as Raman and self-steepening.

  4. Energy Cost Calculator for Faucets and Showerheads | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Use gal Annual Water Cost Lifetime Water Cost WITH ELECTRIC WATER HEATING Annual Energy Use kWh Annual Energy Cost Lifetime Energy Cost ...

  5. Reducing Electricity Use and Costs | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    An energy audit can help you find the most effective ways to save money and reduce energy ... loads is the first step-saving you money by allowing you to purchase a smaller system. ...

  6. Energy Cost Savings Calculator for Commercial Boilers: Closed...

    Office of Environmental Management (EM)

    Water Steam What fuel is used? Gas Oil How many boilers will you purchase? unit(s) Performance Factors Existing What is the capacity of the existing boiler? MBtuhr* What is the ...

  7. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  8. Higher order Fokker-Planck operators

    SciTech Connect (OSTI)

    Pomraning, G.C.

    1996-11-01

    If the scattering interaction in linear particle transport problems is highly peaked about zero momentum transfer, a common and often useful approximation is the replacement of the integral scattering operator with the differential Fokker-Planck operator. This operator involves a first derivative in energy and second derivatives in angle. In this paper, higher order Fokker-Planck scattering operators are derived, involving higher derivatives in both energy and angle. The applicability of these higher order differential operators to representative scattering kernels is discussed. It is shown that, depending upon the details of the scattering kernel in the integral operator, higher order Fokker-Planck approximations may or may not be valid. Even the classic low-order Fokker-Planck operator fails as an approximation for certain highly peaked scattering kernels. In particular, no Fokker-Planck operator is a valid approximation for scattering involving the widely used Henyey-Greenstein scattering kernel.

  9. Development of surface mine cost estimating equations

    SciTech Connect (OSTI)

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  10. Rural electric cooperatives and the cost structure of the electric power industry: A multiproduct analysis

    SciTech Connect (OSTI)

    Berry, D.M.

    1992-01-01

    Since 1935, the federal government of the United States has administered a program designed to make electricity available to rural Americans. This dissertation traces the history of the rural electrification program, as well as its costs. While the Congress intended to simply provide help in building the capital structure of rural electric distribution systems, the program continues to flourish some 35 years after these systems first fully covered the countryside. Once the rural distribution systems were built, the government began to provide cooperatives with billions of dollars in subsidized loans for the generation of electric power. Although this program costs the taxpayers nearly $1 billion per year, no one has ever tested its efficacy. The coops' owner/members do not have the right to trade their individual ownership shares. The RECs do not fully exploit the scale and scope economies observed in the investor-owned sector of this industry. This dissertation compares the relative productive efficiencies of the RECs and the investor-owned electric utilities (IOUs) in the United States. Using multiproduct translog cost functions, the estimated costs of cooperatives are compared to those of IOUs in providing identical output bundles. Three separate products are considered as outputs: (1) wholesale power; (2) power sold to large industrial customers; and (3) power sold to residential and commercial customers. It is estimated that, were the RECs forced to pay market prices for their inputs, their costs would exceed those incurred by the IOUs by about 24 percent. Several policy recommendations are made: (1) the RECs should be converted to stockholder-owned, tax-paying corporations; (2) the government should discontinue its subsidized loan program; (3) the government should sell its hydroelectric power at market prices, nullifying the current preference given to cooperatives and municipal distributors in the purchase of this currently underpriced power.

  11. Incorporating psychological influences in probabilistic cost analysis

    SciTech Connect (OSTI)

    Kujawski, Edouard; Alvaro, Mariana; Edwards, William

    2004-01-08

    Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations that are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for allocating baseline budgets and contingencies. Given the

  12. Syngas Mixed Alcohol Cost Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Techno-economic analysis (TEA) - Feedback to the research efforts Specific objective in 2012: Provide TEA and validate DOE BETO's goal to demonstrate technologies capable of producing cost competitive ethanol from biomass by the year 2012. 2 Quad Chart Overview 3 Start Date Oct 1, 2006 End Date Sept 30, 2012 % Complete 100% Timeline for Mixed Alcohols Year Total [Gasification/Pyrolysis] FY12 $860k [$700k/$160k] FY13 $1,000k [$250k/$750k] FY14 $1,050k [$350k/$700k] projected Years 10 (FY04 to

  13. FY 1995 cost savings report

    SciTech Connect (OSTI)

    Andrews-Smith, K.L., Westinghouse Hanford

    1996-06-21

    Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue

  14. Commercial Buildings Partnerships - Overview of Higher Education Projects

    SciTech Connect (OSTI)

    Parrish, Kristen; Robinson, Alastair; Regnier, Cindy

    2013-02-01

    The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

  15. Costs of U.S. Oil Dependence: 2005 Update

    SciTech Connect (OSTI)

    Greene, D.L.

    2005-03-08

    For thirty years, dependence on oil has been a significant problem for the United States. Oil dependence is not simply a matter of how much oil we import. It is a syndrome, a combination of the vulnerability of the U.S. economy to higher oil prices and oil price shocks and a concentration of world oil supplies in a small group of oil producing states that are willing and able to use their market power to influence world oil prices. Although there are vitally important political and military dimensions to the oil dependence problem, this report focuses on its direct economic costs. These costs are the transfer of wealth from the United States to oil producing countries, the loss of economic potential due to oil prices elevated above competitive market levels, and disruption costs caused by sudden and large oil price movements. Several enhancements have been made to methods used in past studies to estimate these costs, and estimates of key parameters have been updated based on the most recent literature. It is estimated that oil dependence has cost the U.S. economy $3.6 trillion (constant 2000 dollars) since 1970, with the bulk of the losses occurring between 1979 and 1986. However, if oil prices in 2005 average $35-$45/bbl, as recently predicted by the U.S. Energy Information Administration, oil dependence costs in 2005 will be in the range of $150-$250 billion. Costs are relatively evenly divided between the three components. A sensitivity analysis reflecting uncertainty about all the key parameters required to estimate oil dependence costs suggests that a reasonable range of uncertainty for the total costs of U.S. oil dependence over the past 30 years is $2-$6 trillion (constant 2000 dollars). Reckoned in terms of present value using a discount rate of 4.5%, the costs of U.S. oil dependence since 1970 are $8 trillion, with a reasonable range of uncertainty of $5 to $13 trillion.

  16. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 988 also provides guidance, in addition to the applicable cost principles, for determining allowable costs. 2.1.1 Authority to Exclude Research and Development of a Basic ...

  17. 2010 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions, and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  18. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect (OSTI)

    Smith, M.; Gonzales, J.

    2014-08-01

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  19. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect (OSTI)

    Smith, M.; Gonzales, J.

    2014-08-05

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  20. 2010 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  1. Low Cost Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Durable Seal Low Cost Durable Seal Part of a 100 million fuel cell award announced by DOE Secretary Bodman on Oct. 25, 2006. PDF icon 4utc.pdf More Documents & Publications ...

  2. NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - News Releases | NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost December 2, 2013 Two detailed reports from the Energy Department's National Renewable Energy Laboratory (NREL) find that solar financing and other non-hardware costs - often referred to as "soft costs" - now comprise up to 64% of the total price of residential solar energy systems, reflecting how soft costs are becoming an increasingly larger fraction of the cost of installing solar.

  3. Utilization of UV Curing Technology to Significantly Reduce the Manufacturing Cost of LIB Electrodes

    SciTech Connect (OSTI)

    Voelker, Gary; Arnold, John

    2015-11-30

    Previously identified novel binders and associated UV curing technology have been shown to reduce the time required to apply and finish electrode coatings from tens of minutes to less than one second. This revolutionary approach can result in dramatic increases in process speeds, significantly reduced capital (a factor of 10 to 20) and operating costs, reduced energy requirements, and reduced environmental concerns and costs due to the virtual elimination of harmful volatile organic solvents and associated solvent dryers and recovery systems. The accumulated advantages of higher speed, lower capital and operating costs, reduced footprint, lack of VOC recovery, and reduced energy cost is a reduction of 90% in the manufacturing cost of cathodes. When commercialized, the resulting cost reduction in Lithium batteries will allow storage device manufacturers to expand their sales in the market and thereby accrue the energy savings of broader utilization of HEVs, PHEVs and EVs in the U.S., and a broad technology export market is also envisioned.

  4. Biotrans: Cost Optimization Model | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentbiotrans-cost-optimization-model,http Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration &...

  5. Low Cost, Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Cost, Durable Seal Low Cost, Durable Seal This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects. new_fc_roberts_utc.pdf (823.45 KB) More Documents & Publications Improved AST's Based on Real World FCV Data Low Cost Durable Seal Breakout Group 3: Water Management

  6. Soft Costs Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Team Soft Costs Team Elaine Ulrich Headshot Elaine-Ulrich.jpg Dr. Elaine Ulrich is a program manager at the Department of Energy where she leads the SunShot balance of systems/soft costs team. Her team works to reduce the non-hardware (soft costs) of solar, lower barriers to solar adoption, and foster market growth through: support for state and local development and technical assistance programs; information & data assets; finance & business model development; workforce &

  7. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting es111_gallagher_2012_o.pdf (1.1 MB) More Documents & Publications Promises and Challenges of Lithium- and Manganese-Rich Transition-Metal Layered-Oxide Cathodes PHEV Battery Cost Assessment EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

  8. Cost Analysis: Technology, Competitiveness, Market Uncertainty | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Technology to Market » Cost Analysis: Technology, Competitiveness, Market Uncertainty Cost Analysis: Technology, Competitiveness, Market Uncertainty As a basis for strategic planning, competitiveness analysis, funding metrics and targets, SunShot supports analysis teams at national laboratories to assess technology costs, location-specific competitive advantages, policy impacts on system financing, and to perform detailed levelized cost of energy (LCOE) analyses. This shows the

  9. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35.2 June 2016 ______________________________________________________________________________ 1 Cost Participation in Research and Development Contracting [References: Public Law 109-58, Energy Policy Act of 2005, FAR 35.003(b), DEAR 917.70] 1.0 Summary of Latest Changes This update: (1) combines Acquisition Guide Chapters 17.2, Cost Participation, and 35.2, Cost Sharing in Research and Development Contracting, (2) updates delegations of authority, (3) updates sample cost sharing language for

  10. Evolving Utility Cost-Effectiveness Test Criteria

    Broader source: Energy.gov [DOE]

    Presents an overview of tests done to evaluate the cost-effectiveness of energy efficiency program benefits.

  11. High Energy Cost Grants | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Energy Cost Grants High Energy Cost Grants The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and distribution facilities servicing eligible rural communities with home energy costs that are over 275% of the national average. Grants under this program may be used for the acquisition, construction, installation, repair, replacement, or improvement of energy generation, transmission, or distribution facilities in

  12. Microsoft Word - CR-091 Primary Basis of Cost Savings and Cost...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Cost Savings and Cost Savings Amount. The new configurations will only apply to acquisition document types, specifically: BPA Calls, Contracts, Delivery OrderTask Order,...

  13. Volume higher; spot price ranges widen

    SciTech Connect (OSTI)

    1994-11-01

    This article is the October 1994 uranium market summary. During this reporting period, volume on the spot concentrates market doubled. Twelve deals took place: three in the spot concentrates market, one in the medium and long-term market, four in the conversion market, and four in the enrichment market. The restricted price range widened due to higher prices at the top end of the range, while the unrestricted price range widened because of lower prices at the bottom end. Spot conversion prices were higher, and enrichment prices were unchanged.

  14. PETRO: Higher Productivity Crops for Biofuels

    SciTech Connect (OSTI)

    2012-01-01

    PETRO Project: The 10 projects that comprise ARPA-E’s PETRO Project, short for “Plants Engineered to Replace Oil,” aim to develop non-food crops that directly produce transportation fuel. These crops can help supply the transportation sector with agriculturally derived fuels that are cost-competitive with petroleum and do not affect U.S. food supply. PETRO aims to redirect the processes for energy and carbon dioxide (CO2) capture in plants toward fuel production. This would create dedicated energy crops that serve as a domestic alternative to petroleum-based fuels and deliver more energy per acre with less processing prior to the pump.

  15. Renewable Portfolio Standards: Costs and Benefits (Poster)

    SciTech Connect (OSTI)

    Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

    2014-10-01

    This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

  16. Constraining higher derivative supergravity with scattering amplitudes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Wang, Yifan; Yin, Xi

    2015-08-31

    We study supersymmetry constraints on higher derivative deformations of type IIB supergravity by consideration of superamplitudes. Thus, combining constraints of on-shell supervertices and basic results from string perturbation theory, we give a simple argument for the non-renormalization theorem of Green and Sethi, and some of its generalizations.

  17. CD-1, Approve Alternative Selection and Cost Range

    Office of Energy Efficiency and Renewable Energy (EERE)

    CD-1 approval marks the completion of the project definition phase and the conceptual design. This is an iterative process to define, analyze, and refine project concepts and alternatives. This process uses a systems engineering methodology that integrates requirements analysis, risk identification and analysis, acquisition strategies, and concept exploration in order to evolve a cost-effective, preferred solution to meet a mission need (refer to DOE G 413.3-1 for more information). The recommended alternative should provide the essential functions and capabilities at an optimum life-cycle cost, consistent with required cost, scope, schedule, performance, and risk considerations. It should be reflected in the site’s long-range planning documents as well. Approval of CD-1 provides the authorization to begin the project Execution Phase and allows PED funds to be used. The requirements needed to attain CD-1 are listed below. The cost range provided at CD-1 is the preliminary estimate for the selected alternative. As CD-1 progresses to CD-2, the TPC will be refined and the TPC established at CD-2 may be higher than the range defined at CD-1, in which case the PME must be notified. The CD-1 cost range is not the PB cost. The PB against which project success is measured will be established at CD-2. The only exception is when a construction budget request is submitted in advance of an approved CD-2. In this circumstance, refer to Appendix A, Paragraph 4.c.(2). If the top end of the original approved CD-1 cost range grows by more than 50% as the project proceeds toward CD-2, the Program, in coordination with the PME, must reassess the alternative selection process. Upon completing the review, the PME must approve a revised CD-1 identifying the new or reaffirmed selected alternative and an updated CD-1 cost range. This new CD-1 information, to include the new CD-1 cost range and CD-1 approval date, will be reflected within PARS II and all subsequent PDSs and similar

  18. 2013 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Mone, C.; Smith, A.; Maples, B.; Hand, M.

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  19. 2006 Update of Business Downtime Costs

    SciTech Connect (OSTI)

    Hinrichs, Mr. Doug; Goggin, Mr. Michael

    2007-01-01

    The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

  20. Low-cost inertial measurement unit.

    SciTech Connect (OSTI)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.