National Library of Energy BETA

Sample records for hexafluoride management program

  1. Depleted Uranium Hexafluoride Management Program. The technology assessment report for the long-term management of depleted uranium hexafluoride. Volume 2

    SciTech Connect (OSTI)

    Zoller, J.N.; Rosen, R.S.; Holliday, M.A.

    1995-06-30

    With the publication of a Request for Recommendations and Advance Notice of Intent in the November 10, 1994 Federal Register, the Department of Energy initiated a program to assess alternative strategies for the long-term management or use of depleted uranium hexafluoride. This Request was made to help ensure that, by seeking as many recommendations as possible, Department management considers reasonable options in the long-range management strategy. The Depleted Uranium Hexafluoride Management Program consists of three major program elements: Engineering Analysis, Cost Analysis, and an Environmental Impact Statement. This Technology Assessment Report is the first part of the Engineering Analysis Project, and assesses recommendations from interested persons, industry, and Government agencies for potential uses for the depleted uranium hexafluoride stored at the gaseous diffusion plants in Paducah, Kentucky, and Portsmouth, Ohio, and at the Oak Ridge Reservation in Tennessee. Technologies that could facilitate the long-term management of this material are also assessed. The purpose of the Technology Assessment Report is to present the results of the evaluation of these recommendations. Department management will decide which recommendations will receive further study and evaluation.

  2. Depleted Uranium Hexafluoride Management Program. The technology assessment report for the long-term management of depleted uranium hexafluoride. Volume 1

    SciTech Connect (OSTI)

    Zoller, J.N.; Rosen, R.S.; Holliday, M.A.

    1995-06-30

    With the publication of a Request for Recommendations and Advance Notice of Intent in the November 10, 1994 Federal Register, the Department of Energy initiated a program to assess alternative strategies for the long-term management or use of depleted uranium hexafluoride. This Request was made to help ensure that, by seeking as many recommendations as possible, Department management considers reasonable options in the long-range management strategy. The Depleted Uranium Hexafluoride Management Program consists of three major program elements: Engineering Analysis, Cost Analysis, and an Environmental Impact Statement. This Technology Assessment Report is the first part of the Engineering Analysis Project, and assesses recommendations from interested persons, industry, and Government agencies for potential uses for the depleted uranium hexafluoride stored at the gaseous diffusion plants in Paducah, Kentucky, and Portsmouth, Ohio, and at the Oak Ridge Reservation in Tennessee. Technologies that could facilitate the long-term management of this material are also assessed. The purpose of the Technology Assessment Report is to present the results of the evaluation of these recommendations. Department management will decide which recommendations will receive further study and evaluation. These Appendices contain the Federal Register Notice, comments on evaluation factors, independent technical reviewers resumes, independent technical reviewers manual, and technology information packages.

  3. Summary of the engineering analysis report for the long-term management of depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Dubrin, J.W., Rahm-Crites, L.

    1997-09-01

    The Department of Energy (DOE) is reviewing ideas for the long-term management and use of its depleted uranium hexafluoride. DOE owns about 560,000 metric tons (over a billion pounds) of depleted uranium hexafluoride. This material is contained in steel cylinders located in storage yards near Paducah, Kentucky; Portsmouth, Ohio; and at the East Tennessee Technology Park (formerly the K-25 Site) in Oak Ridge, Tennessee. On November 10, 1994, DOE announced its new Depleted Uranium Hexafluoride Management Program by issuing a Request for Recommendations and an Advance Notice of Intent in the Federal Register (59 FR 56324 and 56325). The first part of this program consists of engineering, costs and environmental impact studies. Part one will conclude with the selection of a long-term management plan or strategy. Part two will carry out the selected strategy.

  4. Including environmental concerns in management strategies for depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-12-31

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF{sub 6}) management program. The program is intended to find a long-term management strategy for the DUF{sub 6} that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE`s current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997.

  5. Enterprise Assessments Targeted Review of the Paducah Depleted Uranium Hexafluoride Conversion Facility Fire Protection Program – September 2015

    Broader source: Energy.gov [DOE]

    Targeted Review of the Fire Protection Program at the Paducah Depleted Uranium Hexafluoride Conversion Facility

  6. Results of the remote sensing feasibility study for the uranium hexafluoride storage cylinder yard program

    SciTech Connect (OSTI)

    Balick, L.K.; Bowman, D.R.; Bounds, J.H.

    1997-02-01

    The US DOE manages the safe storage of approximately 650,000 tons of depleted uranium hexafluoride remaining from the Cold War. This slightly radioactive, but chemically active, material is contained in more than 46,000 steel storage cylinders that are located at Oak Ridge, Tennessee; Paducah, Kentucky; and Portsmouth, Ohio. Some of the cylinders are more than 40 years old, and approximately 17,500 are considered problem cylinders because their physical integrity is questionable. These cylinders require an annual visual inspection. The remainder of the 46,000-plus cylinders must be visually inspected every four years. Currently, the cylinder inspection program is extremely labor intensive. Because these inspections are accomplished visually, they may not be effective in the early detection of leaking cylinders. The inspection program requires approximately 12--14 full-time-equivalent (FTE) employees. At the cost of approximately $125K per FTE, this translates to $1,500K per annum just for cylinder inspection. As part of the technology-development portion of the DOE Cylinder Management Program, the DOE Office of Facility Management requested the Remote Sensing Laboratory (RSL) to evaluate remote sensing techniques that have potential to increase the effectiveness of the inspection program and, at the same time, reduce inspection costs and personnel radiation exposure. During two site visits (March and May 1996) to the K-25 Site at Oak Ridge, TN, RSL personnel tested and characterized seven different operating systems believed to detect leakage, surface contamination, thickness and corrosion of cylinder walls, and general area contamination resulting from breached cylinders. The following techniques were used and their performances are discussed: Laser-induced fluorescent imaging; Long-range alpha detection; Neutron activation analysis; Differential gamma-ray attenuation; Compton scatterometry; Active infrared inspection; and Passive thermal infrared imaging.

  7. Method of recovering uranium hexafluoride

    DOE Patents [OSTI]

    Schuman, S.

    1975-12-01

    A method of recovering uranium hexafluoride from gaseous mixtures which comprises adsorbing said uranium hexafluoride on activated carbon is described.

  8. Characterization of options and their analysis requirements for the long-term management of depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Dubrin, J.W.; Rosen, R.S.; Zoller, J.N.; Harri, J.W.; Schwertz, N.L.

    1995-12-01

    The Department of Energy (DOE) is examining alternative strategies for the long-term management of depleted uranium hexafluoride (UF{sub 6}) currently stored at the gaseous diffusion plants at Portsmouth, Ohio, and Paducah, Kentucky, and on the Oak Ridge Reservation in Oak Ridge, Tennessee. This paper describes the methodology for the comprehensive and ongoing technical analysis of the options being considered. An overview of these options, along with several of the suboptions being considered, is presented. The long-term management strategy alternatives fall into three broad categories: use, storage, or disposal. Conversion of the depleted UF6 to another form such as oxide or metal is needed to implement most of these alternatives. Likewise, transportation of materials is an integral part of constructing the complete pathway between the current storage condition and ultimate disposition. The analysis of options includes development of pre-conceptual designs; estimates of effluents, wastes, and emissions; specification of resource requirements; and preliminary hazards assessments. The results of this analysis will assist DOE in selecting a strategy by providing the engineering information necessary to evaluate the environmental impacts and costs of implementing the management strategy alternatives.

  9. PREPARATION OF NEPTUNIUM HEXAFLUORIDE

    DOE Patents [OSTI]

    Seaborg, G.T.; Brown, H.S.

    1961-05-01

    A method is described for preparing neptunium hexafluoride by treating the lower fluorides of neptunium, such as neptunium tetrafluoride and trifluoride, with fluorine at elevated temperatures.

  10. DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plants | Department of Energy Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - 10:00am Addthis Media Contact Brad Mitzelfelt, 859-219-4035 brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for Operations of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities

  11. PREPARATION OF URANIUM HEXAFLUORIDE

    DOE Patents [OSTI]

    Lawroski, S.; Jonke, A.A.; Steunenberg, R.K.

    1959-10-01

    A process is described for preparing uranium hexafluoride from carbonate- leach uranium ore concentrate. The briquetted, crushed, and screened concentrate is reacted with hydrogen fluoride in a fluidized bed, and the uranium tetrafluoride formed is mixed with a solid diluent, such as calcium fluoride. This mixture is fluorinated with fluorine and an inert diluent gas, also in a fluidized bed, and the uranium hexafluoride obtained is finally purified by fractional distillation.

  12. Uranium hexafluoride handling. Proceedings

    SciTech Connect (OSTI)

    Not Available

    1991-12-31

    The United States Department of Energy, Oak Ridge Field Office, and Martin Marietta Energy Systems, Inc., are co-sponsoring this Second International Conference on Uranium Hexafluoride Handling. The conference is offered as a forum for the exchange of information and concepts regarding the technical and regulatory issues and the safety aspects which relate to the handling of uranium hexafluoride. Through the papers presented here, we attempt not only to share technological advances and lessons learned, but also to demonstrate that we are concerned about the health and safety of our workers and the public, and are good stewards of the environment in which we all work and live. These proceedings are a compilation of the work of many experts in that phase of world-wide industry which comprises the nuclear fuel cycle. Their experience spans the entire range over which uranium hexafluoride is involved in the fuel cycle, from the production of UF{sub 6} from the naturally-occurring oxide to its re-conversion to oxide for reactor fuels. The papers furnish insights into the chemical, physical, and nuclear properties of uranium hexafluoride as they influence its transport, storage, and the design and operation of plant-scale facilities for production, processing, and conversion to oxide. The papers demonstrate, in an industry often cited for its excellent safety record, continuing efforts to further improve safety in all areas of handling uranium hexafluoride. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  13. Records Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-02-03

    The Order sets forth requirements and responsibilities for implementing and maintaining a cost-effective records management program throughout the Department of Energy.

  14. Records Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-26

    The Order sets forth requirements and responsibilities for establishing and maintaining a program for the efficient and economical management of records and information assets.

  15. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program. Supersedes DOE O 361.1B.

  16. Management Control Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-04-18

    To establish requirements and responsibilities for the Department of Energy Management Control Program. Cancels DOE O 413.1. Canceled by DOE O 413.1B.

  17. PROCESS FOR MAKING URANIUM HEXAFLUORIDE

    DOE Patents [OSTI]

    Rosen, R.

    1959-07-14

    A process is described for producing uranium hexafluoride by reacting uranium hexachloride with hydrogen fluoride at a temperature below about 150 deg C, under anhydrous conditions.

  18. EERE Program Management Guide - About the Program Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Program Management Guide - About the Program Management Guide The Introduction describes the need for an Operator's Guide, provides information on content and the relationship ...

  19. Defense Waste Management Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Management Programs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  20. Personal Property Management Program Brochure | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Personal Property Management Program Brochure Personal Property Management Program Brochure PDF icon Personal Property Management Program Brochure More Documents & Publications...

  1. Program Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program Management Safety Safety The Office of Environmental Management's (EM) top priority is to ensure proper implementation and continuous improvement of Integrated ...

  2. Uranium hexafluoride bibliography

    SciTech Connect (OSTI)

    Burnham, S.L.

    1988-01-01

    This bibliography is a compilation of reports written about the transportation, handling, safety, and processing of uranium hexafluoride. An on-line literature search was executed using the DOE Energy files and the Nuclear Science Abstracts file to identify pertinent reports. The DOE Energy files contain unclassified information that is processed at the Office of Scientific and Technical Information of the US Department of Energy. The reports selected from these files were published between 1974 and 1983. Nuclear Science Abstracts contains unclassified international nuclear science and technology literature published from 1948 to 1976. In addition, scientific and technical reports published by the US Atomic Energy Commission and the US Energy Research and Development Administration, as well as those published by other agencies, universities, and industrial and research organizations, are included in the Nuclear Science Abstracts file. An alphabetical listing of the acronyms used to denote the corporate sponsors follows the bibliography.

  3. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect (OSTI)

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  4. PRODUCTION OF URANIUM HEXAFLUORIDE

    DOE Patents [OSTI]

    Fowler, R.D.

    1957-08-27

    A process for the production of uranium hexafluoride from the oxides of uranium is reported. In accordance with the method, the higher oxides of uranium may be reduced to uranium dioxide (UO/sub 2/), the latter converted into uranium tetrafluoride by reaction with hydrogen fluoride, and the UF/sub 4/ converted to UF/sub 6/ by reaction with a fluorinating agent, such as CoF/sub 3/. The UO/sub 3/ or U/sub 3/O/sub 8/ is placed in a reac tion chamber in a copper boat or tray enclosed in a copper oven, and heated to 500 to 650 deg C while hydrogen gas is passed through the oven. After nitrogen gas is used to sweep out the hydrogen and the water vapor formed, and while continuing to inaintain the temperature between 400 deg C and 600 deg C, anhydrous hydrogen fluoride is passed through. After completion of the conversion of UO/sub 2/ to UF/sub 4/ the temperature of the reaction chamber is lowered to about 400 deg C or less, the UF/sub 4/ is mixed with the requisite quantity of CoF/sub 3/, and after evacuating the chamber, the mixture is heated to 300 to 400 deg C, and the resulting UF/sub 6/ is led off and delivered to a condenser.

  5. Managing Financing Programs- Spreadsheet Models

    Broader source: Energy.gov [DOE]

    This webinar, held on Jan. 24, 2011, provides a tutorial for managing financing programs through excel spreadsheets.

  6. Greenhouse Gas Management Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-11-01

    Program fact sheet highlighting federal requirements for GHG emissions management, FEMP services to help agencies reduce emissions, and additional resources. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) assists Federal agencies with managing their greenhouse gas (GHG) emissions. GHG management entails measuring emissions and understanding their sources, setting a goal for reducing emissions, developing a plan to meet this goal, and implementing the plan to achieve reductions in emissions. FEMP provides the following services to help Federal agencies meet the requirements of inventorying and reducing their GHG emissions: (1) FEMP offers one-on-one technical assistance to help agencies understand and implement the Federal Greenhouse Gas Accounting and Reporting Guidance and fulfill their inventory reporting requirements. (2) FEMP provides training, tools, and resources on FedCenter to help agencies complete their annual inventories. (3) FEMP serves a leadership role in the interagency Federal Working Group on Greenhouse Gas Accounting and Reporting that develops recommendations to the Council on Environmental Quality (CEQ) for the Federal Greenhouse Gas Accounting and Reporting Guidance. (4) As the focus continues to shift from measuring emissions (completing inventories) to mitigating emissions (achieving reductions), FEMP is developing a strategic planning framework and resources for agencies to prioritize among a variety of options for mitigating their GHG emissions, so that they achieve their reduction goals in the most cost-effective manner. These resources will help agencies analyze their high-quality inventories to make strategic decisions about where to use limited resources to have the greatest impact on reducing emissions. Greenhouse gases trap heat in the lower atmosphere, warming the earth's surface temperature in a natural process known as the 'greenhouse effect.' GHGs include carbon dioxide (CO{sub 2}), methane (CH{sub 4

  7. Federal Energy Management Program Report Template | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program Report Template Federal Energy Management Program Report Template Template to create reports for the Federal Energy Management Program (FEMP)...

  8. EERE Program Management Guide - About the Program Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy (EERE) environment, many Program Managers and their teams bring to the job educational backgrounds and work experiences that are focused on science and technology. ...

  9. EERE Program Management Initiative (PMI) Brochure

    Broader source: Energy.gov [DOE]

    The EERE Program Management Initiative document outlines a coordinated set of actions to improve its program management capabilities.

  10. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  11. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  12. Project Management Career Development Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Project Management Career Development Program (PMCDP) in Office of Project Management Oversight and Assessments was established in 2001 by a Congressional mandate to ensure the Department of...

  13. TWRS Configuration management program plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  14. Project Management Career Development Program | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    are here Home Operational Management Certifications and Professional Development Project Management Career Development Program Project Management Career Development...

  15. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect (OSTI)

    GARVIN, L J; JENSEN, M A

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  16. PPPO Program Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management PPPO Program Management PPPO provides program and operations management for the cleanup of the former gaseous diffusion plant sites at Portsmouth, Ohio and Paducah, ...

  17. Oregon Coastal Management Program | Open Energy Information

    Open Energy Info (EERE)

    Program Jump to: navigation, search Logo: Oregon Coastal Management Program Name: Oregon Coastal Management Program Address: 635 Capitol St. NE Place: Salem, Oregon Zip: 97301-2540...

  18. Employee Performance Management and Recognition Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee Performance Management and Recognition Program Employee Performance Management and Recognition Program The purpose of this program is to establish requirements and ...

  19. DOE Extends Contract to Operate Depleted Uranium Hexafluoride...

    Energy Savers [EERE]

    Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - ...

  20. Configuration Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-27

    The purpose of this standard is to define the objectives of a configuration management process for DOE nuclear facilities (including activities and operations), and to provide detailed examples and supplementary guidance on methods of achieving those objectives. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements nd the physical configuration of the nuclear facility and to ensure that they remain consistent with each other and the documentation.

  1. Advisory Committee Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-22

    The Manual provides detailed DOE requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. Supersedes DOE M 510.1-1.

  2. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-01-24

    The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

  3. Information Collection Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-10-11

    This Order sets forth DOE requirements and responsibilities for implementing the information collection management provisions of the Paperwork Reduction Act of 1995 and the Office of Management and Budgets implementing regulation Controlling Paperwork Burdens on the Public, as contained in 5 CFR 1320. No cancellation.

  4. 2013 Program Management Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Review 2013 Program Management Review BETO Project Management / 2013 Program Management Review program_management_review2013_aopsfoas_craig.pdf (755.77 KB) More Documents & Publications Better Buildings Residential Program Solution Center Demonstration Novel Multi-dimensional Tracers for Geothermal Inter-wall Diagnostics Multiparameter Fiber Optic Sensing System for Monitoring Enhanced Geothermal Systems

  5. Environmental Management Science Program Workshop

    SciTech Connect (OSTI)

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  6. Preconceptual design studies and cost data of depleted uranium hexafluoride conversion plants

    SciTech Connect (OSTI)

    Jones, E

    1999-07-26

    One of the more important legacies left with the Department of Energy (DOE) after the privatization of the United States Enrichment Corporation is the large inventory of depleted uranium hexafluoride (DUF6). The DOE Office of Nuclear Energy, Science and Technology (NE) is responsible for the long-term management of some 700,000 metric tons of DUF6 stored at the sites of the two gaseous diffusion plants located at Paducah, Kentucky and Portsmouth, Ohio, and at the East Tennessee Technology Park in Oak Ridge, Tennessee. The DUF6 management program resides in NE's Office of Depleted Uranium Hexafluoride Management. The current DUF6 program has largely focused on the ongoing maintenance of the cylinders containing DUF6. However, the long-term management and eventual disposition of DUF6 is the subject of a Programmatic Environmental Impact Statement (PEIS) and Public Law 105-204. The first step for future use or disposition is to convert the material, which requires construction and long-term operation of one or more conversion plants. To help inform the DUF6 program's planning activities, it was necessary to perform design and cost studies of likely DUF6 conversion plants at the preconceptual level, beyond the PEIS considerations but not as detailed as required for conceptual designs of actual plants. This report contains the final results from such a preconceptual design study project. In this fast track, three month effort, Lawrence Livermore National Laboratory and Bechtel National Incorporated developed and evaluated seven different preconceptual design cases for a single plant. The preconceptual design, schedules, costs, and issues associated with specific DUF6 conversion approaches, operating periods, and ownership options were evaluated based on criteria established by DOE. The single-plant conversion options studied were similar to the dry-conversion process alternatives from the PEIS. For each of the seven cases considered, this report contains information on

  7. Small Business Program: The Federal Energy Management Program | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Program: The Federal Energy Management Program Small Business Program: The Federal Energy Management Program This fact sheet by the Small Business Program provides general information on the Federal Energy Management Program and the training courses it offers. Small Business Program: The Federal Energy Management Program (415.92 KB) More Documents & Publications Energy Savings Contracts Webinar, May 20, 2013 Energy Savings Performance Contract ENABLE Briefing Energy Savings

  8. Small Business Program Manager Directory

    Broader source: Energy.gov [DOE]

    These Department of Energy Program Elements and offices, primarily located at DOE headquarters (Washington, DC and Germantown, Maryland), have small business points of contact referred to as Small Business Program Managers (SBPMs). SBPMs assist small businesses in marketing to their office/facility.

  9. Human Capital Management Accountability Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-01

    The Order establishes requirements, roles and responsibilities for the Human Capital Management Accountability Program (HCMAP) for human resources programs and personnel and ensures that human capital activities are regulatory and procedurally compliant with Federal statutes and Departmental policies. Does not cancel other directives.

  10. Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SMALL BUSINESS PROGRAM The Federal Energy Management Program (FEMP) is a U.S. Department of Energy (DOE) program focused on reducing the federal government's energy consumption by providing federal agencies with information, tools, and assistance toward tracking and meeting energy- related requirements and goals. FEMP seeks contracts with small businesses to aid in this effort. This fact sheet outlines essential resources and tips to get you started in small business contracting with FEMP.

  11. Acquisition Career Management Program Handbook, Partial Revision...

    Broader source: Energy.gov (indexed) [DOE]

    Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

  12. Federal Energy Management Program (FEMP) Training Resources ...

    Open Energy Info (EERE)

    Management Program (FEMP) Training Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Federal Energy Management Program (FEMP) Training Resources AgencyCompany...

  13. California Coastal Management Program | Open Energy Information

    Open Energy Info (EERE)

    Management Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Coastal Management ProgramLegal Abstract California...

  14. EERE Program Management Guide - Appendix K

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...baprogmgmtguide.html EERE Program Management Guide Appendix K-Roles, ... and completion, and reporting project information to the Program Manager and staff. ...

  15. EERE Program Management Quick Reference Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a companion to the Office of Energy Efficiency and Renewable Energy (EERE) Program Management Reference Guide. It provides an overall description of the EERE program management ...

  16. EERE Program Management Guide- Chapter 2

    Broader source: Energy.gov [DOE]

    Chapter 2 of this guide provides information on EERE programs and subprograms, roles and responsibilities, program management, and strategic management systems.

  17. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay ...

  18. Information Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    Provides a framework for managing information, information resources, and information technology investment, which supports the operating elements of the Department in the accomplishment of its missions and functions in both an efficient and effective manner and in accordance with Departmental policy. Cancels: DOE 1324.5B, DOE 5900.1A, DOE 1130.8A, DOE 1330.1D, DOE 1410.2, DOE 1450.3A, DOE 1700.1, DOE 1800.1A, DOE 5300.1C

  19. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  20. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

  1. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-29

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

  2. EERE Program Management Initiative (PMI) Brochure

    Broader source: Energy.gov (indexed) [DOE]

    ... Program and Project Manager Performance Plans John Doe John Doe John Doe xxx-xx-xxxx EERExxxxxxxForrestalEE-xx EERE Program Management Initiative 8 December 2003 EERE Program ...

  3. Virginia coastal resources management program

    SciTech Connect (OSTI)

    Not Available

    1985-08-01

    Approval of a coastal management plan for coastal land and water use activities on the coast of Virginia is proposed. The coastal management area would embrace all of Tidewater Virginia, approximately 5000 miles long, and would extend to the three-mile outer limit of the United States territorial sea. The core regulatory program would include fisheries management, subaqueous lands management, wetland management, dunes management, nonpoint source pollution control, point source pollution control, shoreline sanitation, and air pollution control. Geographic areas of particular concern would be designated as worthy of special consideration in any planning or management process. These areas would include natural resource areas, such as wetlands, spawning areas, coastal sand dunes, barrier islands, and special wildlife management areas. Natural hazard areas would include areas vulnerable to erosion and areas subject to damage from wind, tides, and storm-related events. Geographic areas of special concern would include those with particular conservation, recreational, ecological, and aesthetic values. Waterfront development areas would include ports, commercial fishing piers, and community waterfronts. Shorefront access planning would provide access to the shoreline and water for recreational activities. Each year, two additional boat ramps would be planned for construction. Energy facility planning would focus on facilities involved in the production of electricity and petroleum, and in the export of coal. Shoreline erosion mitigation planning would identify, control, and mitigate erosion.

  4. LFRG Program Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Plan LFRG Program Management Plan The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG Program Management Plan (LFRG PMP) (185.11 KB) More Documents & Publications LFRG Execution Plan Low-Level Waste Disposal Facility Federal Review Group Manual LFRG Charter

  5. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, supersedes DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  6. Cybersecurity Program Manager (CSPM) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Manager (CSPM) Cybersecurity Program Manager (CSPM) keyboard-70506__180.jpg The CSPM is either a Senior DOE Manager or a Federal employee appointed by the Senior Manager to serve as his/her representative on all cybersecurity issues. The CSPM is responsible for overseeing the implementation of the cybersecurity program within the Senior Manager's organization to include developing, disseminating, and maintaining the organizational Risk Management Implementation Plan (RMIP). CSPM Core

  7. Configuration Management Program - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    73-2003, Configuration Management Program by Diane Johnson The purpose of this standard is to define the objectives of a configuration management process for DOE nuclear facilities...

  8. EERE Program Management Guide - Appendix I

    Energy Savers [EERE]

    Management Virtual University (PMVU) is an online toolkit that allows the EERE user to identify hisher program management training needs, to identify and select training ...

  9. EERE Program Management Guide - Appendix G

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manager, Office of the Federal Energy Management Program ... Office of Energy Efficiency and Renewable Energy (EERE). ... by coordinating federal policy development activities and ...

  10. Transportation and Program Management Services

    Office of Environmental Management (EM)

    Atlanta, Georgia Transportation and Program Management Services Secured Transportation Services, LLC Founded: December, 2003 ff Staff: 7 Experience: Over 145 years combined experience in Nuclear Transportation, Security, HP & Operations Services Transportation The largest Transportation Coordinators of Spent Nuclear Fuel in North America On-Site, Hands-On Assistance (Before & During both Loading & Transport) P d A i t (W iti d/ R i ) Procedure Assistance (Writing and/or Review)

  11. PROCESS FOR PRODUCING URANIUM HEXAFLUORIDE

    DOE Patents [OSTI]

    Fowler, R.D.

    1957-10-22

    A process for the production of uranium hexafluoride from the oxides of uranium is reported. In accordance with the method the higher oxides of uranium may be reduced to uranium dioxide (UO/sub 2/), the latter converted into uranium tetrafluoride by reaction with hydrogen fluoride, and the UF/sub 4/ convented to UF/sub 6/ by reaction with a fluorinating agent. The UO/sub 3/ or U/sub 3/O/sub 8/ is placed in a reaction chamber in a copper boat or tray enclosed in a copper oven, and heated to 500 to 650 deg C while hydrogen gas is passed through the oven. The oven is then swept clean of hydrogen and the water vapor formed by means of nitrogen and then while continuing to maintain the temperature between 400 and 600 deg C, anhydrous hydrogen fluoride is passed through. After completion of the conversion to uranium tetrafluoride, the temperature of the reaction chamber is lowered to ahout 400 deg C, and elemental fluorine is used as the fluorinating agent for the conversion of UF/sub 4/ into UF/sub 6/. The fluorine gas is passed into the chamber, and the UF/sub 6/ formed passes out and is delivered to a condenser.

  12. Human Capital Management Accountability Program (HCMAP) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Human Capital Management Accountability Program (HCMAP) is an online program which serves ... and financial HR metrics that assist human resources professionals in identifying ...

  13. Human Capital Management Accountability Program (HCMAP)

    Broader source: Energy.gov [DOE]

    Human Capital Management Accountability Program (HCMAP) is an online program which serves as the vehicle for identifying and measuring these three factors, effectiveness, efficiency, and timeliness...

  14. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  15. Home audit program: management manual

    SciTech Connect (OSTI)

    Not Available

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  16. Uranium hexafluoride: Safe handling, processing, and transporting: Conference proceedings

    SciTech Connect (OSTI)

    Strunk, W.D.; Thornton, S.G.

    1988-01-01

    This conference seeks to provide a forum for the exchange of information and ideas of the safety aspects and technical issue related to the handling of uranium hexafluoride. By allowing operators, engineers, scientists, managers, educators, and others to meet and share experiences of mutual concern, the conference is also intended to provide the participants with a more complete knowledge of technical and operational issues. The topics for the papers in the proceedings are widely varied and include the results of chemical, metallurgical, mechanical, thermal, and analytical investigations, as well as the developed philosophies of operational, managerial, and regulatory guidelines. Papers have been entered individually into EDB and ERA. (LTN)

  17. Reasonable Accommodation Program Manager (REIMBURSABLE DETAIL...

    Office of Environmental Management (EM)

    Reasonable Accommodation Program Manager (REIMBURSABLE ... Organization Name Department Of Energy Agency SubElement ... and historically under-represented communities. ...

  18. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  19. Total quality management program planning

    SciTech Connect (OSTI)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  20. Project Management Career Development Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Career Development Program Certified Federal Project Directors * Program Secretarial Office Name Certification Level Certified FPD Since EA LOW,JAMES O Level I 10/14/2009 EE BUMBACA,PRISCILLA B Level I 01/25/2011 EE COLLETTE,GREGORY D Level II 04/28/2006 EE DINS,RANDALL S Level II 02/13/2009 EE GRAHAM,MATT E Level III 04/28/2006 EE SWEENEY,ROBIN L Level I 11/21/2008 EM ABDUL,WAHED NMN Level III 12/08/2006 EM ADAMS,KAREN M Level I 07/31/2009 EM ADAMS,VINCENT NMN Level III 12/08/2006

  1. EERE Program Management Quick Reference Guide | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quick Reference Guide EERE Program Management Quick Reference Guide Provides information on the EERE program management structure, program and project management roles...

  2. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program) Jump to: navigation, search Logo: Federal Energy Management Program (FEMP) Name...

  3. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program (FEMP)) Jump to: navigation, search Logo: Federal Energy Management Program...

  4. Integrated Program Management Report (IPMR) Data Item Description...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Program Management Report (IPMR) Data Item Description (DID) Integrated Program Management Report (IPMR) Data Item Description (DID) Integrated Program Management Report...

  5. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  6. Better Buildings Neighborhood Program Grant Recipient Management...

    Broader source: Energy.gov (indexed) [DOE]

    Grant Recipient Management Handbook, Version 2.0 January 2012. Grant Recipient Management Handbook (2.9 MB) More Documents & Publications SEP Notice 10-011 EECBG Program Notice ...

  7. CRAD, NNSA- Radioactive Waste Management Program (RW)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CRAD for Radioactive Waste Management Program (RW). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  8. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  9. NREL: Technology Deployment - Federal Energy Management Program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL helps the U.S. Department of Energy's Federal Energy Management Program (FEMP) by ... Technical Assistance NREL technical assistance to FEMP covers a variety of areas, ...

  10. Bioenergy Technologies Office Program Management Review

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office will be hosting its biennial Program Management Peer Review on June 25, 2015 at the Walter E. Washington Convention Center.

  11. EERE Program Management Guide - Appendix F

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development provides effective program management ... with the National Energy Policy, the Department of ... the formulation and implementation of the U.S. Department ...

  12. Directory of Small Business Program Managers (SBPMs)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Small and Disadvantaged Business Utilization 1000 Independence Ave., SW Washington, DC 20585 DIRECTORY OF SMALL BUSINESS PROGRAM MANAGERS (SBPMs) Section I 2 CONTENTS...

  13. Puget Sound Energy - Resource Conservation Manager Program |...

    Broader source: Energy.gov (indexed) [DOE]

    Resource Conservation Management (RCM) program provides incentives, training, and data services to commercial customers that wish to achieve utility cost savings through...

  14. EIS-0359: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky

    Energy Savers [EERE]

    Site | Department of Energy 59: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site EIS-0359: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site Summary This site-specific EIS considers the construction, operation, maintenance, and decontamination and decommissioning of the proposed depleted uranium hexafluoride (DUF6) conversion facility at three locations within the Paducah site; transportation of depleted uranium conversion products and waste

  15. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets 2014 DOE Project Management Workshop ...

  16. Depleted Uranium Hexafluoride (DUF6) Fully Operational at the...

    Energy Savers [EERE]

    Depleted Uranium Hexafluoride (DUF6) Fully Operational at the Portsmouth and Paducah Gaseous Diffusion Sites October 20, 2011 - 9:16am Addthis When Babcock & Wilcox Conversion ...

  17. Uranium hexafluoride: A manual of good handling practices. Revision...

    Office of Scientific and Technical Information (OSTI)

    and its predecessor agencies in sharing with the nuclear industry their experience in the area of uranium hexafluoride (UFsub 6) shipping containers and handling procedures. ...

  18. Project Management Career Development Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Management » Certifications and Professional Development » Project Management Career Development Program Project Management Career Development Program All PMCDP-related information has been moved to Powerpedia - Project Management Career Development Program.

  19. Program Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the office has many different support functions that are necessary to conduct these projects. Our Planning and Baseline Management Division develops financial plans that ...

  20. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  1. Small Business Program Manager Directory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Manager Directory Small Business Program Manager Directory The Small Business Program Manager Directory lists small business program managers throughout the Department of Energy and associated organizations. Small Business Program Manager Directory (544.1 KB) More Documents & Publications EIS-0310: Amended Record of Decision EIS-0229: Amended Record of Decision EIS-0220: Supplemental Record of Decision

  2. DOE Manual - Advisory Committee Management Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MANUAL DOE M 515.1-1 Approved: 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM U.S. DEPARTMENT OF ENERGY Office of Management AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Management i DOE M 515.1-1 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM 1. PURPOSE. This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee

  3. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect (OSTI)

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  4. Directory of Small Business Program Managers (SBPMs)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Ridge Operations Office (SC) 200 Administration Road Oak Ridge, TN 37381-8501 Abbey Campbell Small Business Program Manager W: (865) 576-9430 campbella@oro.doe.gov Portsmouth ...

  5. Directory of Small Business Program Managers (SBPMs)

    Broader source: Energy.gov (indexed) [DOE]

    Consolidated Business Center 250 East 5th Street 500 Cincinnati, OH 45202 Anne Marie Bird EMCBC Small Business Program Manager W: (513) 246-0569 F: (513) 246-0529...

  6. EERE Program Management Guide - Appendix H

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H Model Senior Executive Services Performance Appraisal H-1 December 2007 http:www1.eere.energy.govbaprogmgmtguide.html SAMPLE EERE Program Management Guide Appendix H-Model ...

  7. Federal Energy Management Program Technical Assistance

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) offers technical assistance to help agencies identify energy-efficiency and renewable energy technologies and successfully implement them in their buildings and fleets.

  8. EERE Program Management Guide- Chapter 3

    Broader source: Energy.gov [DOE]

    Chapter 3 provides information on EERE's communications and outreach efforts, including the Office of Technology Advancement and Outreach, the EERE board of directors, the Technology Development program offices, and the Project Management Center.

  9. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  10. Program Management Review Steering Committee Observations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DPA project funded by BETO and managed by DoD. - Not clear how integration of program ... DOE Terrestial Feedstocks area, and with DoD in conversion. 11 Synergies * Are there ...

  11. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect (OSTI)

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  12. Directory of Small Business Program Managers (SBPMs)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    smallbusiness.energy.gov smallbusiness@hq.doe.gov Office of Small and Disadvantaged Business Utilization (OSDBU) U.S. Department of Energy Office of Small and Disadvantaged Business Utilization 1000 Independence Ave., SW Washington, DC 20585 DIRECTORY OF SMALL BUSINESS PROGRAM MANAGERS (SBPMs) Section I 2 CONTENTS Headquarters Program Elements/Offices ....................................................... Section I Contracting Activities/Offices

  13. Department of Energy Cyber Security Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-03-21

    The purpose of the Department of Energy (DOE) Cyber Security Management Program (hereafter called the Program) is to protect all DOE cyber information and information systems in order to implement the requirements of applicable laws required to maintain national security and ensure DOE business operations proceed without security events such as interruption or compromise. Cancels DOE N 205.1

  14. FAQS Qualification Card Technical Program Manager

    Broader source: Energy.gov [DOE]

    A key element for the Departments Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA).

  15. EERE Program Management Guide - Appendix K | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EERE Program Management Guide - Appendices A-Q Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative ...

  16. Nuclear Safety Basis Program Review Overview and Management Oversight...

    Office of Environmental Management (EM)

    Nuclear Safety Basis Program Review Overview and Management Oversight Standard Review Plan Nuclear Safety Basis Program Review Overview and Management Oversight Standard Review ...

  17. TCEQ - Management Program for Nonpoint Source Water Pollution...

    Open Energy Info (EERE)

    TCEQ - Management Program for Nonpoint Source Water Pollution webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: TCEQ - Management Program for...

  18. Vermont Watershed Management Rivers Program Website | Open Energy...

    Open Energy Info (EERE)

    Vermont Watershed Management Rivers Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Watershed Management Rivers Program Website...

  19. Oregon Onsite Wastewater Management Program Webpage | Open Energy...

    Open Energy Info (EERE)

    Onsite Wastewater Management Program Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Onsite Wastewater Management Program Webpage...

  20. EERE Program Management Guide - Appendix I | Department of Energy

    Energy Savers [EERE]

    I EERE Program Management Guide - Appendix I Appendix I provides information on the EERE Program Management Virtual University. PDF icon pmguideappendixi.pdf More Documents &...

  1. Program & Project Management For The Acquisition Of Capital Assets...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  2. EERE Program Management Guide - Appendix G | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    G EERE Program Management Guide - Appendix G Appendix G is a model position description for EERE program managers. pmguideappendixg.pdf (278.34 KB) More Documents & Publications ...

  3. Managing inventory costs through joint procurement programs

    SciTech Connect (OSTI)

    Harlan, T.E. ); Williams, M.C. )

    1992-01-01

    Given current economic and regulatory challenges, utilities are facing the need to manage inventories more efficiently, lower spare parts costs, and reduce the downtime associated with equipment failure. Two programs helping utilities achieve these goals are the Joint Procurement Corporation (JPC) for multicompany purchase of common equipment and services and the pooled inventory management (PIM) program for joint purchase and storage of nuclear generating unit spare parts. Both of these are cooperative programs that decrease the probability of extended plant outages and reduce duplication of effort and/or inventory among participating utilities.

  4. Personal Property Management Program Brochure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INVENTORY Physical inventory expectations (methods, frequency, and targeted results) are clarified in the chart below. DOE/NNSA ORGANIZATIONAL PROPERTY MANAGEMENT OFFICIALS (OPMOs) SC-Oak Ridge-Rebecca Whitehead (Acting) WhiteheadRN@oro.doe.gov SC-Chicago-Bonnie Anderson Bonnie.Anderson@ch.doe.gov EM-Savannah River-Tim Armstrong Timothy.armstrong@srs.gov EM-CBC-David Lojek dave.lojek@emcbc.doe.gov EM-Richland-Renato Mercado Renato_s_mercado@rl.gov EM-ORP-Richard McNulty Richard_r_mcnulty@rl.gov

  5. The Marshall Islands Data Management Program

    SciTech Connect (OSTI)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  6. Better Buildings Neighborhood Program Grant Recipient Management Handbook

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Grant Recipient Management Handbook, Version 2.0 January 2012.

  7. Program Management Review Opening Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Review Opening Presentation Program Management Review Opening Presentation BETO Program Management Review Opening Presentation, July 2013 program_management_review2013_opening_reed.pdf (1.02 MB) More Documents & Publications 2013 Peer Review Report 2013 Peer Review Presnentations-Plenaries Program Peer Review New Directions

  8. Safeguards and Security Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

  9. OCPR - HQ Mediation Program management Reminders

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6) OCPR - HQ MEDIATION PROGRAM MANAGEMENT REMINDERS Thank you for agreeing to participate in the DOE Headquarters Mediation Program. Here is some information to assist you in preparing for the mediation process. 1. Mediation Process. Mediation is a type of an Alternative Dispute Resolution (ADR) technique to resolve workplace disputes. A neutral third party or mediator assists the parties in discussing their concerns in a productive manner. Mediation is available any time during the EEO

  10. DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6...

    Energy Savers [EERE]

    Uranium Hexafluoride (DUF6) Operations at the two DUF6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky. A cost plus award fee contract with firm-fixed-price ...

  11. DOE Selects Contractor for Depleted Hexafluoride Conversion Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati ...

  12. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  13. Sandia National Laboratories, California Waste Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  14. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    The Order establishes requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees other than those who are exempt herein or by memorandum. Admin Chg 1, dated 2-16-11, cancels DOE O 331.1C.

  15. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    The order establishes requirements and responsibilities for the performance management program for all supervisory and non supervisory employees at grades GS 15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Cancels DOE O 331.1B. Admin Chg 1, 2-16-11.

  16. Federal Energy Management Program Report Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program Report Template Federal Energy Management Program Report Template Template to create reports for the Federal Energy Management Program (FEMP) 53483.pdf (491.71 KB) More Documents & Publications Testing and Validation of Vehicle to Grid Communication Standards Risk Management Tool Attributes: Taking It from Brown to Green: Renewable Energy on Contaminated Lands

  17. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Paducah, Kentucky, site.

    SciTech Connect (OSTI)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 (NEPA) and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Paducah site.

  18. Federal Energy Management Program Director: Dr. Timothy Unruh | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy About the Federal Energy Management Program » Federal Energy Management Program Director: Dr. Timothy Unruh Federal Energy Management Program Director: Dr. Timothy Unruh photo_timothy_unruh.jpg Timothy Unruh, Ph.D., PE, Leadership in Energy and Environmental Design Accredited Professional (LEED AP), Certified Energy Manager (CEM), is director of the Federal Energy Management Program (FEMP). As FEMP Director, Dr. Unruh oversees the implementation of policy and actions that result

  19. Federal Energy Management Program Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You are here Home » Federal Energy Management Program Contacts Federal Energy Management Program Contacts Screenshot of the FEMP organization chart. Contact information is available for Federal Energy Management Program (FEMP) leadership and staff members. The program is directed by Dr. Timothy Unruh. General Information Federal Energy Management Program U.S. Department of Energy EE-5F, 1000 Independence Ave., S.W. Washington, D.C. 20585-0121 202-586-5772 phone 202-586-3000 fax Media Inquiries

  20. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  1. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 ...

  2. Current Status of the Spent Nuclear Fuel Management Program in...

    Office of Scientific and Technical Information (OSTI)

    Current Status of the Spent Nuclear Fuel Management Program in the United States. Citation Details In-Document Search Title: Current Status of the Spent Nuclear Fuel Management...

  3. EVMS Training Snippet: 2.3 The Integrated Program Management...

    Office of Environmental Management (EM)

    EVMS Training Snippet: 2.3 The Integrated Program Management Report (IPMR) This EVMS Training Snippet sponsored by the Office of Project Management (PM) explains the Integrated ...

  4. DI-MGMT-81861 DOE Changes Version -- Integrated Program Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Program Management Report (IPMR) Data Item Description (DID) Earned Value Management System Interpretation Handbook (EVMSIH) Enhancing Earned Value (EV) Analysis Using ...

  5. Integrated Program Management Report (IPMR) Data Item Description...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DI-MGMT-81861 DOE Changes Version -- Integrated Program Management Report Earned Value Management System Interpretation Handbook (EVMSIH) EVMS and Project Analysis Standard ...

  6. Safeguards and Security for Program and Project Management -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Management, Property Management, Safety and Security The Guide provides a methodology for implementing the safeguards and security requirements of DOE O 413.3B....

  7. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  8. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  9. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013. Admin Chg 3, dated 11-13-14 supersedes Admin Chg 2.

  10. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  11. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013, cancels DOE O 331.1C Admin Chg 1. Canceled by DOE O 331.1C Chg 3.

  12. Federal Energy Management Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program Request for Comments Request for Comments FEMP seeks your comments on the tax treatment of an energy savings performance contract energy sales agreement. Read more Large Campus Innovative Change Initiative Large Campus Innovative Change Initiative FEMP's new initiative helps agencies resolve campus-specific energy and water barriers while meeting requirements and maintaining mission. Read more New eTraining Core Course New eTraining Core Course Learn the basics

  13. Best Management Practice #2: Information and Education Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Information and Education Programs Best Management Practice 2: Information and Education Programs Educating users about water conservation is essential to sustain the savings ...

  14. Oregon Coastal Management Program Website | Open Energy Information

    Open Energy Info (EERE)

    Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Coastal Management Program Website Abstract Provides information on...

  15. ENERGY STAR Portfolio Manager and Utility Benchmarking Programs...

    Broader source: Energy.gov (indexed) [DOE]

    Manager and Utility Benchmarking Programs: Effectiveness as a Conduit to Utility Energy Efficiency Programs Rohit Vaidya, Nexus Market Research Arlis Reynolds, National Grid...

  16. EERE Program Management Guide - Appendix C | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C EERE Program Management Guide - Appendix C Appendix C provides suggested practice for the program progress review (including developing and preparing the review). ...

  17. The solubility of uranium hexafluoride in perfluoroethers

    SciTech Connect (OSTI)

    Barber, E.J.

    1984-07-15

    The polyperfluoroethers are compatible with uranium hexafluoride (UF/sub 6/) and are suitable for use in diffusion pumps and in mechanical vacuum pumps which rely on oil as both the lubricant and the seal. The UF/sub 6/ is soluble in all fluids with which it is compatible. Because a number of vacuum pumps in the BOP facilities of the GCEP plant employ these perfluoroether oils as the working fluid and have oil chambers which are large, questions have been raised as to the relationships governing the solubility of UF/sub 6/ in these materials and the maximum quantities of UF/sub 6/ which could be dissolved in these oils under credible accident conditions. This report summarizes these solubility relations and the interaction of the UF/sub 6/ solubility and the pumping capability of this type of vacuum pump. It will be shown that, whereas the solubility of UF/sub 6/ in Fomblin Y25 fluoroether fluid under a UF/sub 6/ pressure of 760 torr and at the pump operating temperature of 160/sup 0/F is about 500 g of UF/sub 6/ per liter of oil, the system controls are such as to isolate the system from the pumps before the quantity of UF/sub 6/ dissolved in the perfluoroether exceeds about 10 g of UF/sub 6/ per liter of oil. 13 refs., 7 figs.

  18. Electron Ionization Mass Spectrum of Tellurium Hexafluoride

    SciTech Connect (OSTI)

    Clark, Richard A.; McNamara, Bruce K.; Barinaga, Charles J.; Peterson, James M.; Govind, Niranjan; Andersen, Amity; Abrecht, David G.; Schwantes, Jon M.; Ballou, Nathan E.

    2015-05-18

    The first electron ionization mass spectrum of tellurium hexafluoride (TeF6) is reported. The starting material was produced by direct fluorination of Te metal or TeO2 with nitrogen trifluoride. Formation of TeF6 was confirmed through cryogenic capture of the tellurium fluorination product and analysis through Raman spectroscopy. The eight natural abundance isotopes were observed for each of the set of fragment ions: TeF5+, TeF4+ TeF3+, TeF2+, TeF1+, and Te+, Te2+. A trend in increasing abundance was observed for the even fluoride bearing ions: TeF1+ < TeF3+ < TeF5+, and a decreasing abundance was observed for the even fragment series: Te(0)+ > TeF2+ > TeF4+ > TeF6+, with the molecular ion TeF6+ not observed at all. Density functional theory based electronic structure calculations were used to calculate optimized ground state geometries of these gas phase species and their relative stabilities explain the trends in the data and the lack of observed signal for TeF6+.

  19. Fire testing of bare uranium hexafluoride cylinders

    SciTech Connect (OSTI)

    Pryor, W.A.

    1991-12-31

    In 1965, the Oak Ridge Gaseous Diffusion Plant (ORGDP), now the K-25 Site, conducted a series of tests in which bare cylinders of uranium hexafluoride (UF{sub 6}) were exposed to engulfing oil fires for the US Atomic Energy Commission (AEC), now the US Department of Energy (DOE). The tests are described and the results, conclusions, and observations are presented. Two each of the following types of cylinders were tested: 3.5-in.-diam {times} 7.5-in.-long cylinders of Monel (Harshaw), 5.0-in.-diam {times} 30-in.-long cylinders of Monel, and 8-in.-diam {times} 48-in.-long cylinders of nickel. The cylinders were filled approximately to the standard UF{sub 6} fill limits of 5, 55, and 250 lb, respectively, with a U-235 content of 0.22%. The 5-in.- and 8-in.-diam cylinders were tested individually with and without their metal valve covers. For the 3.5-in.-diam Harshaw cylinders and the 5.0-in.-diam cylinder without a valve cover the valves failed and UF{sub 6} was released. The remaining cylinders ruptured explosively in time intervals ranging from about 8.5 to 11 min.

  20. Fire testing of bare uranium hexafluoride cylinders

    SciTech Connect (OSTI)

    Pryor, W.A.

    1991-12-31

    In 1965, the Oak Ridge Gaseous Diffusion Plant (ORGDP), now the K-25 Site, conducted a series of tests in which bare cylinders of uranium hexafluoride (UF{sub 6}) were exposed to engulfing oil fires for the US Atomic Energy Commission (AEC), now the US Department of Energy (DOE). The tests are described and the results, conclusions, and observations are presented. Two each of the following types of cylinders were tested: 3.5-in.-diam {times} 7.5-in.-long cylinders of Monel (Harshaw), 5.0-in.-diam {times} x 30-in.-long cylinders of Monel, and 8-in.-diam {times} 48-in.-long cylinders of nickel. The cylinders were filled approximately to the standard UF{sub 6} fill limits of 5, 55, and 250 lb, respectively, with a U-235 content of 0.22%. The 5-in.- and 8-in.-diam cylinders were tested individually with and without their metal valve covers. For the 3.5-in.-diam Harshaw cylinders and the 5.0-in.-diam cylinder without a valve cover, the valves failed and UF{sub 6} was released. The remaining 6 cylinders ruptured explosively in time intervals ranging from about 8.5 to 11 min.

  1. New Mexico Nonpoint Source Management Program | Open Energy Informatio...

    Open Energy Info (EERE)

    Nonpoint Source Management Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: New Mexico Nonpoint Source Management ProgramLegal...

  2. CRAD, 2015 Emergency Management Program Review - December 29...

    Energy Savers [EERE]

    2015 Emergency Management Program Review - December 29, 2014 (EA CRAD 33-01, Rev. 0) CRAD, 2015 Emergency Management Program Review - December 29, 2014 (EA CRAD 33-01, Rev. 0)...

  3. Regional Water Board NPDES Program Manager | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Regional Water Board NPDES Program ManagerLegal Abstract Regional Water Board NPDES Program Manager,...

  4. CRAD, Emergency Management Program - February 13, 2014 (HSS CRAD...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Management Program - February 13, 2014 (HSS CRAD 45-60, Rev. 0) CRAD, Emergency Management Program - February 13, 2014 (HSS CRAD 45-60, Rev. 0) February 18, 2014 ...

  5. FAQS Reference Guide - Technical Program Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Manager FAQS Reference Guide - Technical Program Manager This reference guide addresses the competency statements in the February 2004 edition of DOE-Standard (STD)-1178-2004, Technical Program Manager Functional Area Qualification Standard. Technical Program Manager Qualification Standard Reference Guide, May 2013 (1.7 MB) More Documents & Publications DOE-STD-1104-2014 Training Site Visit Report, Lawrence Livermore National Laboratory - February 2011 Crosswalk of DOE-STD-1104 Bases

  6. Federal Energy Management Program News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program News Federal Energy Management Program News The Federal Energy Management Program (FEMP) publishes news about training opportunities, new documents and online tools, award winners, events, and more. July 20, 2016 Federal Energy Management Program News FEMP Debuts New eTraining on Sustainable Acquisition for Federal Agencies This online course was developed in partnership with the U.S. Department of Energy's (DOE) Office of Sustainability Support to provide staff

  7. Video: Federal Energy Management Program eTraining Core Courses |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Federal Energy Management Program eTraining Core Courses Video: Federal Energy Management Program eTraining Core Courses Video summarizes the Federal Energy Management Program's eTraining core courses available anytime online on the Whole Building Design Guide website

  8. Personal Property Management Program Brochure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program Brochure Personal Property Management Program Brochure Personal Property Management Program Brochure (727.47 KB) More Documents & Publications Personal Property Briefings Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property COMMENTS&#0;

  9. Federal Energy Management Program Training Offers IACET Continuing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education Units | Department of Energy Federal Energy Management Program Training Offers IACET Continuing Education Units Federal Energy Management Program Training Offers IACET Continuing Education Units Video explains how the Federal Energy Management Program (FEMP) offers International Association for Continuing Education and Training (IACET) continuing education units for eTraining core courses

  10. Federal Energy Management Program Interagency Partnerships | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Technical Assistance » Federal Energy Management Program Interagency Partnerships Federal Energy Management Program Interagency Partnerships Each interagency partnership is different, and recommendations are crafted based on each organization's purpose, function, goals, requirements, and needs. Each interagency partnership is different, and recommendations are crafted based on each organization's purpose, function, goals, requirements, and needs. The Federal Energy Management Program

  11. Federal Energy Management Program Organization Chart | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management Program Organization Chart Federal Energy Management Program Organization Chart Screenshot of the FEMP organization chart. Document shows the organization chart for the U.S. Department of Energy's Federal Energy Management Program. Download the FEMP organization chart. (273.52 KB)

  12. Federal Energy Management Program Website Contact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contact Us » Federal Energy Management Program Website Contact Federal Energy Management Program Website Contact Use this form to send us your comments, report problems, and/or ask questions about information on the Federal Energy Management Program (FEMP) website. Your Email Message Here * CAPTCHA This question is for testing whether you are a human visitor and to prevent automated spam submissions. Submit

  13. FEMA Emergency Management Performance Grant Program

    Broader source: Energy.gov [DOE]

    The Emergency Management Performance Grant (EMPG) Program provides federal funds to assist state, local, tribal and territorial governments in preparing for all hazards, as authorized by Section 662 of the Post Katrina Emergency Management Reform Act (6 U.S.C. sect. 762) and the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (42 U.S.C. sect. 5121 et seq.). Title VI of the Stafford Act authorizes FEMA to make grants for the purpose of providing a system of emergency preparedness for the protection of life and property in the United States from hazards and to vest responsibility for emergency preparedness jointly in the federal government and the states and their political subdivisions. The FY 2015 EMPG will provide federal funds to assist state, local, tribal and territorial emergency management agencies to obtain the resources required to support the National Preparedness Goal's (NPG's) associated mission areas and core capabilities. The federal government, through the EMPG Program, provides necessary direction, coordination, and guidance, and provides necessary assistance, as authorized in this title, to support a comprehensive all hazards emergency preparedness system.

  14. Mixed Waste Focus Area program management plan

    SciTech Connect (OSTI)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  15. Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager JSA Mentor-Protégé Program Thomas Jefferson National Accelerator Facility Newport, News, Virginia Danny Lloyd Supply Purchasing Manager JLab Small Business Program Manager JSA Mentor-Protégé Program * Jefferson Lab is managed and operated by Jefferson Science Associates, LLC, a joint venture between Southeastern Universities Research Association, Inc., and Computer Sciences Corporation Applied Technologies, LLC,

  16. EERE Program Management Guide - Chapter 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Program Implementation Program implementation is spending the money to implement the program. 6.1 Program Implementation Overview Implementing the budget means implementing ...

  17. Program and Project Management for the Acquisition of Capital Assets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Program and Project Management for the Acquisition of Capital Assets Program and Project Management for the Acquisition of Capital Assets This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. Program and Project Management for the Acquisition of Capital Assets More Documents & Publications Guiding

  18. Federal Energy Managment Program Investment Grade Audit Tool | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Managment Program Investment Grade Audit Tool Federal Energy Managment Program Investment Grade Audit Tool Zip file contains the Federal Energy Management Program's Investment Grade Audit (IGA) Tool that is used by energy service companies during the ESPC ENABLE process. Download the investment grade audit tool. (43.68 MB) More Documents & Publications ESPC ENABLE Notice of Intent to Award Guide and Template Energy Savings Performance Contract (ESPC) ENABLE Program Energy

  19. TRIMOLECULAR REACTIONS OF URANIUM HEXAFLUORIDE WITH WATER

    SciTech Connect (OSTI)

    Westbrook, M.; Becnel, J.; Garrison, S.

    2010-02-25

    The hydrolysis reaction of uranium hexafluoride (UF{sub 6}) is a key step in the synthesis of uranium dioxide (UO{sub 2}) powder for nuclear fuels. Mechanisms for the hydrolysis reactions are studied here with density functional theory and the Stuttgart small-core scalar relativistic pseudopotential and associated basis set for uranium. The reaction of a single UF{sub 6} molecule with a water molecule in the gas phase has been previously predicted to proceed over a relatively sizeable barrier of 78.2 kJ {center_dot} mol{sup -1}, indicating this reaction is only feasible at elevated temperatures. Given the observed formation of a second morphology for the UO{sub 2} product coupled with the observations of rapid, spontaneous hydrolysis at ambient conditions, an alternate reaction pathway must exist. In the present work, two trimolecular hydrolysis mechanisms are studied with density functional theory: (1) the reaction between two UF{sub 6} molecules and one water molecule, and (2) the reaction of two water molecules with a single UF{sub 6} molecule. The predicted reaction of two UF{sub 6} molecules with one water molecule displays an interesting 'fluorine-shuttle' mechanism, a significant energy barrier of 69.0 kJ {center_dot} mol{sup -1} to the formation of UF{sub 5}OH, and an enthalpy of reaction ({Delta}H{sub 298}) of +17.9 kJ {center_dot} mol{sup -1}. The reaction of a single UF{sub 6} molecule with two water molecules displays a 'proton-shuttle' mechanism, and is more favorable, having a slightly lower computed energy barrier of 58.9 kJ {center_dot} mol{sup -1} and an exothermic enthalpy of reaction ({Delta}H{sub 298}) of -13.9 kJ {center_dot} mol{sup -1}. The exothermic nature of the overall UF{sub 6} + 2 {center_dot} H{sub 2}O trimolecular reaction and the lowering of the barrier height with respect to the bimolecular reaction are encouraging; however, the sizable energy barrier indicates further study of the UF{sub 6} hydrolysis reaction mechanism is

  20. Development and Implementation of a Program Management Maturity Model

    SciTech Connect (OSTI)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  1. Configuration management plan for LABCORE Program

    SciTech Connect (OSTI)

    Rich, H.S.

    1995-01-03

    A hardware/software configuration management plan for LABCORE. LABCORE is a laboratory information management system used by Analytical Services.

  2. EERE Program Management Guide - Appendix C

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C Suggested Practice-Program Progress, Review Process, Phase II Guidanc e The Program ... C. Instructions for the Preparation of Program Progress Reviews The PPR consists of a ...

  3. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  4. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  5. Integrated Safety Management System (ISMS) program description

    SciTech Connect (OSTI)

    BUMP, S.L.

    1999-09-30

    This document the ISMS Program for the 300 Area and lists the procedures necessary to implement the program.

  6. Kentucky Launches State-Wide School Energy Manager Program |...

    Broader source: Energy.gov (indexed) [DOE]

    In what could potentially be the first program of its scale, Kentucky has hired a new green team of 35 energy managers. Kentucky's School Energy Managers Project (SEMP) will ...

  7. Nuclear Safety Basis Program Review Overview and Management Oversight

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standard Review Plan | Department of Energy Safety Basis Program Review Overview and Management Oversight Standard Review Plan Nuclear Safety Basis Program Review Overview and Management Oversight Standard Review Plan This SRP, Nuclear Safety Basis Program Review, consists of five volumes. It provides information to help strengthen the technical rigor of line management oversight and federal monitoring of DOE nuclear facilities. It provides a primer on the safety basis development and

  8. Federal Energy Management Program Golden Field Office Contacts | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contact Us » Federal Energy Management Program Golden Field Office Contacts Federal Energy Management Program Golden Field Office Contacts The following field contacts at the U.S. Department of Energy's Golden Field Office support the Federal Energy Management Program (FEMP). FEMP staff contact information is also available. Wayne Latham Energy Savings Performance Contract (ESPC) Contracting Officer 720-356-1507

  9. Federal Energy Management Program Issues 2016 AFFECT Funding Opportunity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcement | Department of Energy Federal Energy Management Program Issues 2016 AFFECT Funding Opportunity Announcement Federal Energy Management Program Issues 2016 AFFECT Funding Opportunity Announcement May 25, 2016 - 5:26pm Addthis On May 26, 2016, the Federal Energy Management Program (FEMP) issued a Funding Opportunity Announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies 2016. The Assisting Federal Facilities with Energy

  10. Federal Energy Management Program National Laboratory Liaison Contacts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Contact Us » Federal Energy Management Program National Laboratory Liaison Contacts Federal Energy Management Program National Laboratory Liaison Contacts The following U.S. Department of Energy national laboratory liaisons serve as primary contacts for the Federal Energy Management Program (FEMP). FEMP staff contact information is also available. Christopher Payne Lawrence Berkeley National Laboratory 510-495-2577 Jerry Davis National Renewable Energy Laboratory

  11. 2015 Program Management Review Presentations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Review Presentations 2015 Program Management Review Presentations The Bioenergy Technologies Office's (BETO) 2015 Program Management Review was held on June 25, 2015, at the Walter E. Washington Convention Center in Washington, D.C. During this event, lead reviewers and members of the external steering committee for the 2015 Project Peer Review presented their feedback on BETO's research portfolio and overall recommendations for the Office. 2015_pmr_strategic_planning.pdf

  12. About the Federal Energy Management Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the Federal Energy Management Program About the Federal Energy Management Program With more than 350,000 buildings and 600,000 road vehicles, the federal government is our nation's largest energy consumer. Federal agencies have a tremendous opportunity and an obligation to reduce energy, water, and petroleum use, as well as greenhouse gas emissions in their operations. Directed by Dr. Timothy Unruh, the Federal Energy Management Program (FEMP) provides agencies and organizations with the

  13. Program and Project Management for the Acquisition of Capital Assets -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Directives, Delegations, and Requirements B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement, Program Management The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of

  14. EERE Program Management Guide - Appendices A-Q | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices A-Q EERE Program Management Guide - Appendices A-Q Appendices A-Q provide information on the EERE multi-year program plan template. PDF icon appendixa-q.pdf More ...

  15. Guide for Operational Configuration Management Program Part II

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-01-18

    This Standard presents the program criteria and implementation guidance for an operational configuration management (CM) program for Department of Energy (DOE) facilities. This Standard is applicable to DOE nuclear facilities in the operational phase.

  16. Materials Control and Accountability Program Manager | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Materials Control and Accountability Program Manager Amy Whitworth Amy Whitworth July 2009 Fellow by the Institute of Nuclear Materials Management NNSA Materials Control and Accountability Program Manager Amy Whitworth was awarded the prestigious title of Fellow by the Institute of Nuclear Materials Management during its recent annual meeting in Tucson, Ariz. Fellows must be nominated by their peers, recommended by the INMM Fellows Committee and approved by

  17. Aging Management Program for Stainless Steel Dry Storage System Canisters

    SciTech Connect (OSTI)

    Dunn, Darrell S.; Lin, Bruce P.; Meyer, Ryan M.; Anderson, Michael T.

    2015-06-01

    This is a conference paper presenting an aging management program for stainless steel dry storage system canisters. NRC is lead author of paper. PNNL provided input.

  18. Mission Plan for the Civilian Radioactive Waste Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and...

  19. Checklist for Managing a General Program Evaluation Study

    Broader source: Energy.gov [DOE]

    This checklist for managing a general program evaluation study provides action items covering the following topics: initial planning; evaluation design and procurement; implementation of study;...

  20. Federal Energy Management Program Training Offers IACET Continuing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Federal Energy Management Program (FEMP) offers International Association for Continuing Education and Training (IACET) continuing education units for eTraining core courses

  1. Federal Energy Management Program Recovery Act Technical Assistance...

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery and Reinvestment Act of 2009 included funding for the Federal Energy Management Program (FEMP) to complete nearly 120 technical assistance projects. FEMP ...

  2. EERE Program Management Guide - Appendix F | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Program Management Guide - Appendix F Appendix F is a model position description for the Deputy Assistant Secretary for the Office of Technology Development. PDF icon ...

  3. EERE Program Management Guide - Appendix Q | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Program Management Guide - Appendix Q Appendix Q provides a comprehensive glossary of terms used throughout the rest of the PMI guide. PDF icon pmguideappendixq.pdf More ...

  4. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets (310.65 KB) More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB ...

  5. TCEQ - Texas Nonpoint Source Management Program Manual | Open...

    Open Energy Info (EERE)

    Texas Nonpoint Source Management Program Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: TCEQ - Texas...

  6. Oregon Onsite Wastewater Management Program Forms by County Webpage...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Oregon Onsite Wastewater Management Program Forms by County Webpage Abstract Provides access to county level onsite...

  7. Team Based Program Design Management and Research Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Team Based Program Design Management and Research Operations Involvement in Nanoscale Materials ES&H August 2009 Presenter: Kevin Sheffield, Pacific Northwest National Laboratory ...

  8. EERE Program Management Guide - Appendix M | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M EERE Program Management Guide - Appendix M Appendix M provides information on support service contracts, which are a significant portion of the Department's total contracting ...

  9. EERE Program Management Guide - Appendix D | Department of Energy

    Energy Savers [EERE]

    D EERE Program Management Guide - Appendix D Appendix D provides information on the background and purpose of the EERE Peer Review Guide. PDF icon pmguideappendixd.pdf More...

  10. Vermont Agency of Transportation Access Management Program Guidelines...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont Agency of Transportation Access Management Program...

  11. Strategic Energy Management for Regulators of Ratepayer-Funded Programs

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Provides regulators with information on how to design and implement whole-building, continuous-improvement energy management programs for commercial buildings.

  12. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.3B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement,...

  13. New Draft Page Change - Program and Project Management for the...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Page Change - Program and Project Management for the Acquisition of Capital Assets by Patricia Greeson The Page Change is a limited update to incorporate recent Secretarial...

  14. EERE Program Management Guide - Appendix E | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E EERE Program Management Guide - Appendix E Appendix E provides information on and a suggested framework for the merit review process. PDF icon pmguideappendixe.pdf More ...

  15. EERE Program Management Guide - Appendix L | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L EERE Program Management Guide - Appendix L Appendix L provides information on the role of the national laboratories. PDF icon pmguideappendixl.pdf More Documents & Publications ...

  16. EERE Program Management Guide - Appendix H | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H EERE Program Management Guide - Appendix H Appendix H is a model senior executive services performance appraisal. pmguideappendixh.pdf (6.49 MB) More Documents & Publications ...

  17. IT Capital Planning Corporate Management Improvement Program (CMIP)

    Broader source: Energy.gov [DOE]

    The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

  18. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Chg 1 (Admin Chg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health ...

  19. Anaheim Public Utilities- Small Business Energy Management Assistance Program

    Broader source: Energy.gov [DOE]

    The Small Business Energy Management System Program provides participating customers with free electrical energy use evaluations, retrofit funding, and installation assistance. Anaheim Public...

  20. Federal Energy Management Program Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  1. EERE Program Management Guide - Appendix P | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    P EERE Program Management Guide - Appendix P Appendix P provides a comprehensive listing of the references used to formulate the different chapters of this guide. ...

  2. EERE Program Management Guide - Appendix N | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    N EERE Program Management Guide - Appendix N Appendix N provides EERE guidelines, definitions, and restrictions for support services contracting. pmguideappendixn.pdf (64.54 KB) ...

  3. Ocean Energy Technology Overview: Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01

    Introduction to and overview of ocean renewable energy resources and technologies prepared for the U.S. Department of Energy Federal Energy management Program.

  4. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the National Nuclear Security Administration (NNSA), with program and project management direction for the ... and security, and environmental, safety, and health ...

  5. EERE Program Management Guide - Appendix J | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J EERE Program Management Guide - Appendix J Appendix J provides guidelines for functions that must be performed by government employees (inherently governmental functions). PDF ...

  6. EM International Program Presentation for Waste Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Associate Principal Deputy Assistant Secretary Monica Regalbuto gave a presentation on EM's International Program at the Waste Management Conference in March 2015 in Phoenix. EM ...

  7. EERE Program Management Guide - Appendix B | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B EERE Program Management Guide - Appendix B Appendix B provides suggested practice for developing the annual operating plan Phase II guidance. pmguideappendixb.pdf (98.2

  8. 2014 Program Management Workshop Speaker Biographies | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Workshop Speaker Biographies PDF icon 2014 PM Workshop Speaker Biographies24 Mar 2014.pdf More Documents & Publications 2015 DOE Acquisition and Project Management...

  9. Recommendations for improvements to program and project management

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  10. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites

    Broader source: Energy.gov [DOE]

    Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008)

  11. Federal Energy Management Program Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cyrus Nasseri Renewable Energy Rachel Shepherd ENABLE Program, DOE Qualified List Ira Birnbaum Project Facilitation Service, Life of Contract Program Brandi Eng-Rohrbach ...

  12. EERE Program Management Guide - Appendix D

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to EERE program planning. Knowledge about the quality and effectiveness of current projects and programs is ... while retaining the necessary flexibility to conduct a ...

  13. Accreditation Management of Superior Energy Performance Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Since its inception, Superior Energy Performance (SEP) program accreditation has been ... DOE's Advanced Manufacturing Office will continue to act as the SEP Program Administrator. ...

  14. EERE Program Management Guide- Appendix O

    Broader source: Energy.gov [DOE]

    Appendix O provides a comprehensive list of acronyms for the different EERE programs/program offices, terms, facilities, procedures, and processes discussed throughout the guide.

  15. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  16. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  17. CRC handbook of management of radiation protection programs

    SciTech Connect (OSTI)

    Miller, K.L.; Weider, W.A.

    1985-01-01

    This volume details the organization and management of radiation safety programs, including both preventive and emergency response measures. Included are guidelines and checklists for managing radioactive waste processing programs, dealing with litigation, and responding to public or news media concerns. The last sections list state, federal, and international requirements for transportation of radioactive materials.

  18. Criticality concerns in cleaning large uranium hexafluoride cylinders

    SciTech Connect (OSTI)

    Sheaffer, M.K.; Keeton, S.C.; Lutz, H.F.

    1995-06-01

    Cleaning large cylinders used to transport low-enriched uranium hexafluoride (UF{sub 6}) presents several challenges to nuclear criticality safety. This paper presents a brief overview of the cleaning process, the criticality controls typically employed and their bases. Potential shortfalls in implementing these controls are highlighted, and a simple example to illustrate the difficulties in complying with the Double Contingency Principle is discussed. Finally, a summary of recommended criticality controls for large cylinder cleaning operations is presented.

  19. Sandia National Laboratories, California Chemical Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  20. Energy Management Programs at 3M Canada

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 July 2014 . All Rights Reserved. 3M Energy Management at 3M Canada OVERVIEW An Introduction to 3M 3M Sustainability Energy Management Initiatives Results Insight 1 July 2014 . ...

  1. ENERGY STAR Portfolio Manager and Utility Benchmarking Programs: Effectiveness as a Conduit to Utility Energy Efficiency Programs

    Broader source: Energy.gov [DOE]

    ENERGY STAR Portfolio Manager and Utility Benchmarking Programs: Effectiveness as a Conduit to Utility Energy Efficiency Programs

  2. EERE Program Management Guide - Chapter 1

    Energy Savers [EERE]

    ... stabilizing nuclear materials, managing and ... quality, and science. Powerful accelerators, light sources, neutron beam ... technologies, lightweight materials, vehicle ...

  3. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-30

    The order sets forth requirements for personal property management and accountability. Admin Chg 1, dated 10-22-12.

  4. EIS-0329: Proposed Construction, Operation, Decontamination/Decommissioning of Depleted Uranium Hexafluoride Conversion Facilities

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposal to construct, operate, maintain, and decontaminate and decommission two depleted uranium hexafluoride (DUF 6) conversion facilities, at Portsmouth, Ohio, and Paducah, Kentucky.

  5. DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum

  6. Global Nuclear Futures Program Manager, Sandia National Laboratories |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Global Nuclear Futures Program Manager, Sandia National Laboratories Tom Sanders Tom Sanders Tom Sanders, president of the American Nuclear Society and manager of Global Nuclear Futures Program at Sandia National Laboratories, was recently appointed to the U.S. Department of Commerce's Civil Nuclear Trade Advisory Committee (CINTAC). CINTAC advises the Secretary of Commerce on issues related to programs that expand United States exports of

  7. EERE Program Management Guide- Chapter 7

    Broader source: Energy.gov [DOE]

    Chapter 7 of this guide includes general program analysis and evaluation concepts such as monitoring work performance, GPRA requirements, evaluation activities, and the EERE SMS program analysis and evaluation stage.

  8. Financial Program Management for Continuous Improvement

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar, held on March 16, 2011, focuses on ways to improve financial programs and discusses strategies for continuous improvements.

  9. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  10. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  11. Program Management Initiative | Department of Energy

    Office of Environmental Management (EM)

    disciplined systems and processes, highly motivated and capable professionals, useful tools and job aids, and a management approach that emphasizes results. To achieve...

  12. EERE Program Management Guide - Appendix O

    Broader source: Energy.gov (indexed) [DOE]

    ESE Energy, Science and Environment ESS Employee Self Service EU European Union FAR ... SMS Strategic Management System SPOT Search Portal of Technology SSA Source Selection ...

  13. EERE Program Management Guide - Appendix B

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is as follows: * Assemble planning team, * Review goals and ... projects, major milestones, technical goals, and probable cost, and * Establish Project Managers and provide necessary ...

  14. Federal Government Energy Management Conservation Programs Reports...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L. No. 95-619), as amended, and provide information on energy consumption in federal ... Energy management and energy consumption requirements of section 543 of NECPA, as amended ...

  15. Federal Energy Management Program Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Affairs, Technology Deployment Nicolas Baker FEMP Website Joe Konrade Budget Peter Murphy O&M, Energy Security Cyrus Nasseri Interagency Coordination, Data Management Chris Tremper...

  16. Management and Program Analyst (Supplemental Labor)

    Broader source: Energy.gov [DOE]

    This position is located in the Supplemental Labor Management Office (NSP), Supply Chain Services (NS), Chief Administrative Office (N), Bonneville Power Administration (BPA). The Supplemental...

  17. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-30

    The order sets forth requirements for personal property management and accountability. Admin Chg 1, dated 10-22-12, supersedes DOE O 580.1A.

  18. Federal Energy Management Program (FEMP) Technical Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Industry Interactive Procurement System (IIPS) Federal Energy and Water Management Awards: Frequently Asked Questions Home Energy Score Assessor ...

  19. Environmental Management Science Education and Internship Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental worker near water Oak Ridge Office of Environmental Management offers students and recent college graduates opportunities to learn about the mission of the DOE-EM...

  20. Power Marketing Administration Emergency Management Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-18

    This Manual establishes emergency management policy and requirements for emergency planning, preparedness, readiness assurance, and response for the Department's Power Marketing Administrations. Supersedes DOE O 5500.11.

  1. Transportation and Program Management Services | Department of...

    Office of Environmental Management (EM)

    Documents & Publications Nuclear Transportation Management Services TEC Working Group Topic Groups Rail Key Documents TEC Working Group Topic Groups Manual Review Key Documents...

  2. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 6.0 Program Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Multi-Year Research, Development and Demonstration Plan Page 6 - 1 6.0 Program Management and Operations The U.S. Department of Energy's (DOE's) Hydrogen and Fuel Cells Program (the Program) is composed of activities within the Offices of Energy Efficiency and Renewable Energy (EERE); Fossil Energy (FE); Nuclear Energy (NE); and Science (SC). EERE's Fuel Cell Technologies Program (FCT Program) represents the major component of this effort. The FCT Program Manager manages the

  3. EERE Program Management Guide - Appendix E

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Is a uniform merit and peer review process necessary or desirable? Is merit and ... the key to EERE's achievements. In planning its projects and programs, in choosing research ...

  4. EERE Program Management Guide- Chapter 6

    Broader source: Energy.gov [DOE]

    Chapter 6 of this guide includes general concepts on program implementation such as identifying work to be performed, field input, funding work, and procurement, and financial assistance.

  5. Austin Energy- Commercial Energy Management Rebate Program

    Broader source: Energy.gov [DOE]

    Austin Energy offers incentives for commercial customers to increase the energy efficiency of facilities through the Commercial Rebate Program. Rebates are available for qualified HVAC equipment,...

  6. Federal Energy Management Program Report Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This workshop was funded by the U.S. Department of Energy Solar Energy Technologies Program as part ... between technical and financial communities * System design * Standard ...

  7. EERE Program Management Guide - Chapter 8

    Broader source: Energy.gov (indexed) [DOE]

    ... CPS captures EERE's JOULE, Program Assessment and Rating Tool statistics, and PMA ... Central Repository and Reporting Environment 8.4.1 EERE Information System Goals ...

  8. General Engineer / Physical Scientist (Program Management)

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will provide administrative and technical leadership, direction and program oversight of sophisticated and technologically advanced national nuclear weapons,...

  9. Waste Management Program. Technical progress report, October-December 1982

    SciTech Connect (OSTI)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  10. Wetland assessment of the effects of construction and operation of a depleteduranium hexafluoride conversion facility at the Portsmouth, Ohio, site.

    SciTech Connect (OSTI)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This wetland assessment has been prepared by DOE, pursuant to Executive Order 11990 (''Protection of Wetlands'') and DOE regulations for implementing this Executive Order as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [Compliance with Floodplain and Wetland Environmental Review Requirements]), to evaluate potential impacts to wetlands from the construction and operation of a conversion facility at the DOE Portsmouth site. Approximately 0.02 acre (0.009 ha) of a 0.08-acre (0.03-ha) palustrine emergent wetland would likely be eliminated by direct placement of fill material during facility construction at Location A. Portions of this wetland that are not filled may be indirectly affected by an altered

  11. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect (OSTI)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  12. Power Marketing Administration Emergency Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1994-05-09

    To establish specific emergency management policy and requirements for the Department of Energy Power Marketing Administration appropriate to their specific regional power missions. This directive does not cancel another directive. Canceled by DOE M151.1-1.

  13. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-07

    This Order provides responsibilities and requirements for personal property management at the Department. Change 1, dated 5-8-08, includes responsibilities for heads of Departmental elements to be accountable for personal property inventories. Cancels DOE O 580.1.

  14. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-07

    This Order provides responsibilities and requirements for personal property management at the Department. Change 1, dated 5-8-08, includes responsibilities for heads of Departmental elements to be accountable for personal property inventories.

  15. EERE Program Management Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grants Administration 8.6 Other EERE Information and Business Management Tools 8.7 Electronic Government Appendices - Compilation of appendices A-Q Appendix A - EERE Multi-Year ...

  16. Directory of Small Business Program Managers (SBPMs)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Jr., University 2575 Sand Hill Road, MS-01 Menlo Park, CA 94025 Susan Simpkins SCM Operations Support Manager W: (650) 926-4616 F: (650) 926-4563 susans@slac.stanford.edu ...

  17. Facilities Program Manager | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations » Facilities Management Facilities Management INL is a multiprogram, federally funded research and development center (FFRDC) emphasizing applied engineering to provide solutions for use across the DOE complex, as well as regionally, nationally, and world wide. INL is a multiprogram, federally funded research and development center (FFRDC) emphasizing applied engineering to provide solutions for use across the DOE complex, as well as regionally, nationally, and world wide. Overview

  18. Federal Energy Management Program Issues 2016 AFFECT Funding...

    Broader source: Energy.gov (indexed) [DOE]

    On May 26, 2016, the Federal Energy Management Program (FEMP) issued a Funding Opportunity ... Updated information will be posted on the FEMP website as it becomes available. To learn ...

  19. Safeguards and Security for Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-15

    This Guide provides approaches for implementing security provisions within the functional areas contained in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets. Canceled by DOE G 413.3-3A.

  20. Security and Emergency Management Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-03-01

    Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

  1. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  2. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13.B, Chg 1 (PgChg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health...

  3. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARCHIVED DOE O 413.3A Chg 1, Program and Project Management for the Acquisition of Capital Assets by John Makepeace Functional areas: Acquisition, Defense Nuclear Facility Safety...

  4. West Valley Demonstration Project Transportation Emergency Management Program

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS .........................................................................................

  5. Acting Biomass Program Manager Dr. Valerie Reed to Host Live...

    Broader source: Energy.gov (indexed) [DOE]

    December 16th, the Energy Department (@energy) will be hosting a live Twitter Q&A on biofuels with Dr. Valerie Reed, Acting Manager of the Biomass Program. Dr. Reed holds a Ph. D....

  6. Employee Concerns Program Manager | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    442.1A, Department of Energy Employee Concerns Program . Per this Order, plays a leadership role in encouraging the free and open expression of employee concerns and providing DOE ...

  7. EERE Program Management Guide- Chapter 5

    Broader source: Energy.gov [DOE]

    Chapter 5 of this guide provides guidance on budget formulation, the field budget call, spring budget review, the DOE corporate program review budget, the OMB request, the congressional budget request, and the performance budget formulation stage.

  8. NNSA's Asset Management Program Completes First Pilot | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) NNSA's Asset Management Program Completes First Pilot December 22, 2015 Asset Management Program implementation team. The National Nuclear Security Administration (NNSA) today announced completion of a $520k pilot to replace a roof, as well as heating, ventilation and cooling (HVAC) system for the Core Library and Data Center at Mercury, Nevada (http://nevada.usgs.gov/mercury/). The library was established as a repository for geologic, hydrologic, and

  9. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  10. Program Management on Multifamily Retrofits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multifamily Retrofits » Program Management on Multifamily Retrofits Program Management on Multifamily Retrofits Completing a multifamily retrofit is a complex process that requires subject matter expertise in a number of disciplines. Weatherization agencies and organizations are experienced in completing successful projects under challenging conditions, and have broad expertise working with local stakeholders. Use the "Grantee Contacts" page at the U.S. DOE's Weatherization Assistance

  11. Federal Energy Management Program Launches New Training Series | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Energy Management Program Launches New Training Series Federal Energy Management Program Launches New Training Series September 30, 2015 - 2:22pm Addthis Timothy Unruh Timothy Unruh FEMP Director What does this project do? FEMP Certificate Series are groupings of eTraining core courses on various topics that allow learners to reach a higher level of expertise in certain series topic areas. Examples of the topics include: building operations, renewables, project financing, and

  12. Federal Energy Management Program Publications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Federal Energy Management Program Publications logo_femp.png The Federal Energy Management Program (FEMP) offers publications to help agencies meet federal laws and requirements, understand and implement energy-saving technologies and methods, use FEMP financing mechanisms, and more. To find a publication, browse by title, topic, or type. Click a column heading to sort the table. Case studies are also available. Title Topic Type Buy Energy-Efficient Products: A Guide for Federal

  13. DOE National Analytical Management Program Draws Global Interest |

    Office of Environmental Management (EM)

    Department of Energy National Analytical Management Program Draws Global Interest DOE National Analytical Management Program Draws Global Interest February 27, 2013 - 12:00pm Addthis Hnin Khaing focuses on her work at WIPP Laboratories near Carlsbad, New Mexico Hnin Khaing focuses on her work at WIPP Laboratories near Carlsbad, New Mexico Corey White works at WIPP Laboratories near Carlsbad, New Mexico Corey White works at WIPP Laboratories near Carlsbad, New Mexico Hnin Khaing focuses on

  14. The Department's Cyber Security Incident Management Program, IG-0787 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cyber Security Incident Management Program, IG-0787 The Department's Cyber Security Incident Management Program, IG-0787 The Department of Energy operates numerous interconnected computer networks and systems to help accon~plishit s strategic missions in the areas of energy, defense, science, and the environment. These systems are frequently subjected to sophisticated cyber attacks that could potentially affect the Department's ability to carry out its mission. During

  15. Federal Energy Management Program Technical Assistance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Federal Energy Management Program Technical Assistance Federal Energy Management Program Technical Assistance Ask Questions Ask Questions Contact FEMP's project specialists with questions related to implementing energy efficiency and renewable energy projects. Read more Apply for Technical Assistance Apply for Technical Assistance Visit the FEMP Technical Assistance Request Portal to apply for help with energy efficiency and renewable energy projects. Read more Enter Into an

  16. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  17. UMTRA Project Administrative Files Collection Records Management Program

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  18. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Supersedes DOE O 413.3B Chg 1 (AdminChg)

  19. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool.

  20. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    Becker, D.L.; Lindquist, M.R.

    1993-03-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of enriched uranium hexafluoride (UF[sub 6]). Uranium hexafluoride enriched greater than 1.0 wt percent [sup 235]U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF[sub 6] cylinders/overpacks (Reference 3). Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF[sub 6] packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a tram of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the review is documented in Reference 4.

  1. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    Becker, D.L.; Lindquist, M.R.

    1993-03-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of enriched uranium hexafluoride (UF{sub 6}). Uranium hexafluoride enriched greater than 1.0 wt percent {sup 235}U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF{sub 6} cylinders/overpacks (Reference 3). Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF{sub 6} packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a tram of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the review is documented in Reference 4.

  2. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio. Revision 1

    SciTech Connect (OSTI)

    Becker, D.L.; Green, D.J.; Lindquist, M.R.

    1993-07-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio, is operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy-Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of uranium hexafluoride (UF{sub 6}). Uranium hexafluoride enriched uranium than 1.0 wt percent {sup 235}U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF{sub 6} cylinders/overpacks. Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF{sub 6} packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a team of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the is documented in Reference 4.

  3. Federal Government Energy Management Conservation Programs Reports to Congress

    Office of Energy Efficiency and Renewable Energy (EERE)

    Annual reports on federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95‐619), as amended, and provide information on energy consumption in federal buildings, operations, and vehicles. They were compiled by the Federal Energy Management Program.

  4. Appendix E - GPRA06 federal energy management program documentation

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The mission of the Federal Energy Management Program (FEMP) is to promote energy security, environmental stewardship and cost reduction through energy efficiency and water conservation, the use of distributed and renewable energy, and sound utility management decisions at Federal sites. [FY 2005 Congressional Budget Request, p. 475

  5. 2008 Federal Energy Management Program (FEMP) Market Report

    SciTech Connect (OSTI)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  6. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  7. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  8. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  9. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-11

    DOE Order 580.1, initially issued December 2005 and revised in May 2008, provides Department-level requirements and performance expectations for proper accountability and management of personal property owned by the Department of Energy (DOE), whether in the hands of the Federal government or the contractor.

  10. Checklist for managing a general program evaluation study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Checklist for Managing a General Program Evaluation Study 1 Status Action Step Reference(s) 1 Initial Planning Construct or confirm program logic model Step 4 Determine program decisions subject to evaluation Step 1 Develop statement(s) of evaluation objectives (evaluation's contributions to making a decision) Step 1 Determine type(s) of information needed to evaluate objectives Step 1 Determine appropriate type(s) of evaluation Step 1 Determine resources required to achieve objectives Step 2

  11. Material Management and Minimization Program | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Material Management and Minimization Program DOE/NNSA Successfully Establishes Uranium Lease and Takeback Program to Support Critical Medical Isotope Production In January 2016, the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) successfully established the Uranium Lease and Take-Back (ULTB) program, as directed in the American Medical Isotopes Production Act of 2012, to support the commercial production of the medical

  12. Recovery of Mark-18a (Mk-18A) Target Materials: Program Management...

    Office of Scientific and Technical Information (OSTI)

    Target Materials: Program Management Plan Citation Details In-Document Search Title: Recovery of Mark-18a (Mk-18A) Target Materials: Program Management Plan You are accessing ...

  13. Waste Management Program. Technical progress report, Aporil-June 1983

    SciTech Connect (OSTI)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  14. Assessment of light water reactor accident management programs and experience

    SciTech Connect (OSTI)

    Hammersley, R.J.

    1992-03-01

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation.

  15. Federal Energy Management Program Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Director Dr. Timothy Unruh Fleet, Training, Sustainability, and Innovative Change Daniel Gore Sustainability, Legislative Affairs, Innovative Change Nicolas Baker Energy Exchange Daniel Gore Fleet Vehicles Tom Homan (Acting) Training Leslie Nicholls Organization Chart Technical Services Brad Gustafson Procurement Services Skye Schell Customer Service Hayes Jones Metering, Product Procurement, Water Saralyn Bunch Lab and Data Center Challenges RJ McIntosh (ORISE Fellow) Special Projects

  16. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 1

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management.

  17. Acquisition Career Management Program (Informational Purposes Only)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-11-21

    This draft has been scheduled for final review before the Directives Review Board on 4-2-15 (delayed from 12-4-14 session). All major comments and concerns should be provided to your DRB representative, following your organization process. If you do not know who your representative is, please see the list of DRB members at https://www.directives.doe.gov/beta/references/directives-review-board. If your office is represented by Ingrid Kolb, Director, Office of Management, please submit your major concerns and comments to the DRB Liaison, Camille Beben (Camille.Beben@hq.doe.gov; 202-586-4014). All major comments and concerns should be submitted by COB 3-31-15.

  18. Small Water System Management Program: 100 K Area

    SciTech Connect (OSTI)

    Hunacek, G.S. Jr.

    1995-06-29

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site`s 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410.

  19. Integrated Management Program for Radioactive Sealed Sources in EgyptIMPRSS

    SciTech Connect (OSTI)

    Hasan, A.; El-Adham, K.

    2004-10-03

    This presentation discusses the Integrated Management Program for Radioactive Realed Sources (IMPRSS) in Egypt.

  20. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  1. Best Management Practice #2: Information and Education Programs |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2: Information and Education Programs Best Management Practice #2: Information and Education Programs Educating users about water conservation is essential to sustain the savings of water-efficient technologies and practices. It is not enough to install water-saving technology in a facility. New operation procedures, retrofits, and replacements are most effective when employees, contractors, and the public know what the new technologies or methods are and how to use them

  2. Design and calibration of the AWCC for measuring uranium hexafluoride

    SciTech Connect (OSTI)

    Wenz, T.R.; Menlove, H.O.; WSalton, G.; Baca, J.

    1995-08-01

    An Active Well Coincidence Counter (AWCC) has been modified to measure variable enrichment uranium hexafluoride (UF{sub 6}) in storage bottles. An active assay technique was used to measure the {sup 235}U content because of the small quantity (nominal loading of 2 kg UF{sub 6}) and nonuniform distribution of UF{sub 6} in the storage bottles. A new insert was designed for the AWCC composed of graphite containing four americium-lithium sources. Monte Carlo calculations were used to design the insert and to calibrate the detector. Benchmark measurements and calculations were performed using uranium oxide resulted in assay values that agreed within 2 to 3% of destructive assay values. In addition to UF{sub 6}, the detector was also calibrated for HEU ingots, billets, and alloy scrap using the standard Mode 1 end-plug configuration.

  3. In-line assay monitor for uranium hexafluoride

    DOE Patents [OSTI]

    Wallace, S.A.

    1980-03-21

    An in-line assay monitor for determining the content of uranium-235 in a uranium hexafluoride gas isotopic separation system is provided which removes the necessity of complete access to the operating parameters of the system for determining the uranium-235 content. The method and monitor for carrying out the method involve cooling of a radiation pervious chamber connected in fluid communication with the selected point in the system to withdraw a specimen and solidify the specimen in the chamber. The specimen is irradiated by means of an ionizing radiation source of energy different from that of the 185 keV gamma emissions from uranium-235. The uranium-235 content of the specimen is determined from comparison of the accumulated 185 keV energy counts and reference energy counts. The latter is used to measure the total uranium isotopic content of the specimen.

  4. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  5. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2008-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  6. Acquisition Career Management Program Handbook Change 2010-03

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to announce ACMP Handbook Change 2010- 03. This change amends the experience requirement for FAC-C Level II certification as currently stated in Chapter 3 of the January 2009, review of the Department's Acquisition Career Management Program Handbook (ref: Policy Flash 2009-17)

  7. Emergency Management Fundamentals and the Operational Emergency Base Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11

    The Guide provides information about the emergency management fundamentals imbedded in the requirements of DOE O 151.1C, as well as acceptable methods of meeting the requirements for the Operational Emergency Base Program, which ensures that all DOE facilities have effective capabilities for all emergency response. Supersedes DOE G 151.1-1, Volume 1.

  8. Federal Energy Management Program Recovery Act Technical Assistance Projects

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) issued a Call for Technical Services in May 2010 to help federal agencies identify and prioritize energy efficiency, water efficiency, and renewable energy projects. Read information about the Call for Technical Services (including technical service opportunities, application process, selection criteria, reporting requirements, and contacts).

  9. Ronald L. Schoff Senior Program Manager, Technology Innovation

    U.S. Energy Information Administration (EIA) Indexed Site

    Ronald L. Schoff Senior Program Manager, Technology Innovation EIA Energy Conference 2015 June 15, 2015 Value of the Integrated Grid Utility Integrated Distributed Resource Deployment 2 Electric Power Research Institute Our Mission... Safe Advancing safe, reliable, affordable and environmentally responsible electricity for society through global collaboration, thought leadership and science & technology innovation 3 The Traditional Electric Power System Central Generation Predictable

  10. DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ohio and Kentucky Facilities | Department of Energy DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities April 1, 2015 - 3:30pm Addthis Media Contact: Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking a contractor to perform

  11. Cylinder monitoring program

    SciTech Connect (OSTI)

    Alderson, J.H.

    1991-12-31

    Cylinders containing depleted uranium hexafluoride (UF{sub 6}) in storage at the Department of Energy (DOE) gaseous diffusion plants, managed by Martin Marietta Energy Systems, Inc., are being evaluated to determine their expected storage life. Cylinders evaluated recently have been in storage service for 30 to 40 years. In the present environment, the remaining life for these storage cylinders is estimated to be 30 years or greater. The group of cylinders involved in recent tests will continue to be monitored on a periodic basis, and other storage cylinders will be observed as on a statistical sample population. The program has been extended to all types of large capacity UF{sub 6} cylinders.

  12. High-grade paper recycling: A program management perspective

    SciTech Connect (OSTI)

    Carter, R.L.

    1999-03-01

    Recycling of high-grade paper is one method of reducing the use of natural resources and the amount of waste being emitted into the environment, both in the process of manufacturing and in the disposal of unneeded documents. The Air Force Materiel Command (AFMC) is a significant user of high-grade paper, thus recycling represents a potential saving to society in the form of lessened negative impact on the environment as the result of AFMC operations. The possibility also exists for AFMC to reduce operating costs. The purpose of this study is to explore means of reducing high-grade paper disposal by AFMC, examine program management of high-grade paper recycling by AFMC, and apply effective program management processes to the AFMC high-grade paper recycling program.

  13. Office of Nuclear Energy Knowledge Management Program Situational Analysis Report

    SciTech Connect (OSTI)

    Kimberlyn C. Mousseau

    2011-12-01

    Knowledge management (KM) has been a high priority for the Department of Energy (DOE) Office of Nuclear Energy (NE) for the past several years. NE Programs are moving toward well-established knowledge management practices and a formal knowledge management program has been established. Knowledge management is being practiced to some level within each of the NE programs. Although it continues to evolve as NE programs evolve, a formal strategic plan that guides the implementation of KM has been developed. Despite the acceptance of KM within DOE NE, more work is necessary before the NE KM program can be considered fully successful. Per Dr. David J. Skyrme[1], an organization typically moves through the following evolutionary phases: (1) Ad-hoc - KM is being practiced to some level in some parts of the organization; (2) Formal - KM is established as a formal project or program; (3) Expanding - the use of KM as a discipline grows in practice across different parts of the organization; (4) Cohesive - there is a degree of coordination of KM; (5) Integrated - there are formal standards and approaches that give every individual access to most organizational knowledge through common interfaces; and (6) Embedded - KM is part-and-parcel of everyday tasks; it blends seamlessly into the background. According to the evolutionary phases, the NE KM program is operating at the two lower levels, Ad-hoc and Formal. Although KM is being practiced to some level, it is not being practiced in a consistent manner across the NE programs. To be fully successful, more emphasis must be placed on establishing KM standards and processes for collecting, organizing, sharing and accessing NE knowledge. Existing knowledge needs to be prioritized and gathered on a routine basis, its existence formally recorded in a knowledge inventory. Governance to ensure the quality of the knowledge being used must also be considered. For easy retrieval, knowledge must be organized according to a taxonomy that

  14. Floodplain/wetland assessment of the effects of construction and operation ofa depleted uranium hexafluoride conversion facility at the Paducah, Kentucky,site.

    SciTech Connect (OSTI)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This floodplain/wetland assessment has been prepared by DOE, pursuant to Executive Order 11988 (''Floodplain Management''), Executive Order 11990 (Protection of Wetlands), and DOE regulations for implementing these Executive Orders as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [''Compliance with Floodplain and Wetland Environmental Review Requirements'']), to evaluate potential impacts to floodplains and wetlands from the construction and operation of a conversion facility at the DOE Paducah site. Reconstruction of the bridge crossing Bayou Creek would occur within the Bayou Creek 100-year floodplain. Replacement of bridge components, including the bridge supports, however, would not be expected to

  15. Quality Assurance Plan for Transportation Management Division Transportation Training Programs

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The U.S. Department of Transportation (DOT) implemented new rules requiring minimum levels of training for certain key individuals who handle, package, transport, or otherwise prepare hazardous materials for transportation. In response to these rules, the U.S. Department of Energy (DOE), Transportation Management Division (TMD), has developed a transportation safety training program. This program supplies designed instructional methodology and course materials to provide basic levels of DOT training to personnel for whom training has become mandatory. In addition, this program provides advanced hazardous waste and radioactive material packaging and transportation training to help personnel achieve proficiency and/or certification as hazardous waste and radioactive material shippers. This training program does not include site-specific or task-specific training beyond DOT requirements.

  16. Sandia National Laboratories, California Waste Management Program annual report : February 2009.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System rogram Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  17. Mr. William R. Augustine Deputy Chief Programs Management Division

    Office of Legacy Management (LM)

    h :.:, \ i 5 , Department of Energy Washington, DC 20585 t 7-c I-..._ .' , Mr. William R. Augustine Deputy Chief Programs Management Division U.S. Army Corps of Engineers Department of the Army Washington. D.C. 203 14- 1000 Dear Mr. Augustine: I am writing to you as a follow-up to discussions our staffs have had regarding two former Department of the Army facilities in the Formerly Used Defense Sites (FUDS) program where the former Atomic Energy Commission (AEC) also conducted activities. These

  18. Jump start: DuPont exports its energy management program

    SciTech Connect (OSTI)

    1994-11-23

    In August 1993, DuPont launched its innovative Jump Start program, which called for managers in its 25 largest plants to carry out a 120-day crash effort to find ways to reduce energy use at their facilities. The effort produced ideas that will result in $21.5 million in energy savings over six years, exceeding DuPont`s target. It also kicked off a longer-term program the company hopes will cut as much as $300 million, or 15% from energy bills through 2000.

  19. Plant perspective on electronic document management systems for process safety management programs

    SciTech Connect (OSTI)

    Mannan, M.; Lee, W.S. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-08-01

    As mandated by the Clean Air Act Amendments of 1990, the Occupational Safety and Health Administration (OSHA) promulgated on February 24, 1992 the Process Management (PSM) rule: 29 CFR 1910.119. Compliance with the PSM requirements is causing a significant impact on both financial resources and manpower for the covered facilities. A major portion of the efforts have been concentrated on developing and compiling a vast amount of data in various formats (i.e., autocad, word processing, and numeric databases). Because of the need to access and revise these data on a continuous basis, many facilities have started to implement computer-based document management systems to store, manage, and maintain these data. This paper provides a plant perspective of the necessary features and characteristics of a computer-based document management system. An electronic document management system can also form the basis for a plant workflow system. Once, all the information related to a plant`s PSM program are inputted into the system, it is possible to control the plant workflow using the management of change system and maintenance work requests. Other key issues that must be included in a computer-based system are redlining capabilities, execution of management of change authorization, and interfacing with existing computer programs (many plants are already using different kinds of software for a variety of objectives). This paper provides a roadmap for the development and implementation of an electronic document management system.

  20. DOE-RL Integrated Safety Management System Program Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-06-29

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight.

  1. Sandia National Laboratories, California Hazardous Materials Management Program annual report : February 2009.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental anagement ystem Program Manual. This program annual report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  2. EVMS Training Snippet: 2.3 The Integrated Program Management Report (IPMR)

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) explains the Integrated Program Management Report (IPMR) Data Item Description. 

  3. Homeland Security and Emergency Management Coordination (HSEMC) Program |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Homeland Security and Emergency Management Coordination (HSEMC) Program NNSA ensures that capabilities are in place to respond to any NNSA and Department of Energy facility emergency. It is also the nation's premier responder to any nuclear or radiological incident within the United States or abroad and provides operational planning and training to counter both domestic and international nuclear terrorism. NNSA ensures that capabilities are

  4. Patch and Update Management Program for Energy Delivery Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Patch and Update Management Program for Energy Delivery Systems A simplified process of patching and updating energy delivery system devices for end users and equipment vendors Background The energy sector places an emphasis on the availability and reliability of energy delivery operations. While best practice avoids the connection of energy delivery system devices to external networks, their increasing interconnectivity poses greater risk to cyber vulnerabilities. Proper and timely patches and

  5. Federal Energy Management Program Training | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Federal Energy Management Program Training Learn the basics of specifying and purchasing sustainable products and services for the federal government in this new online course. Read more Register now to receive key updates on fiscal year 2015 Government Performance Toward Energy and Sustainability Goals. Read more Register onsite for the 2016 Energy Exchange August 9-11 in Providence, Rhode Island. Read more Complete sets of accredited courses for comprehensive instruction on timely

  6. International Border Management Systems (IBMS) Program : visions and strategies.

    SciTech Connect (OSTI)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  7. Tank waste remediation system nuclear criticality safety program management review

    SciTech Connect (OSTI)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  8. Blazing the energy trail: The Municipal Energy Management Program

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    The Urban Consortium Energy Task Force pioneers energy and environmental solutions for US cities and counties. When local officials participate in the task force, they open the door to many resources for their communities. The US is entering a period of renewed interest in energy management. Improvements in municipal energy management allow communities to free up energy operating funds to meet other needs. These improvements can even keep energy dollars in the community through the purchase of services and products used to save energy. With this idea in mind, the US Department of Energy Municipal Energy Management Program has funded more than 250 projects that demonstrate innovative energy technologies and management tools in cities and counties through the Urban Consortium Energy Task Force (UCETF). UCETF helps the US Department of Energy foster municipal energy management through networks with cities and urbanized counties and through links with three national associations of local governments. UCETF provides funding for projects that demonstrate innovative and realistic technologies, strategies, and methods that help urban America become more energy efficient and environmentally responsible. The task force provides technical support to local jurisdictions selected for projects. UCETF also shares information about successful energy management projects with cities and counties throughout the country via technical reports and project papers. The descriptions included here capsulize a sample of UCETF`s demonstration projects around the country.

  9. CRAD, Emergency Management Program – February 13, 2014 (HSS CRAD 45-61, Rev. 0)

    Broader source: Energy.gov [DOE]

    Emergency Management Program Inspection Criteria and Review Approach Document - Exercises Program Review and Severe Event Response Evaluations (HSS CRAD 45-61, Rev. 0)

  10. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    SciTech Connect (OSTI)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-02-26

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials.

  11. Implementing and managing a DSM program: Central Hudson`s dollar $avers commercial/industrial rebate program

    SciTech Connect (OSTI)

    Voltz, M.F.

    1996-01-01

    Demand-Side Management (DSM) program managers at utilities throughout the United States are faced with the challenge of achieving DSM goals while minimizing program costs in order to mitigate rate impacts. Many utilities are also allowed to earn a shareholder equity incentive based upon the cost effectiveness of DSM programs (shared savings type incentive). Program goals must be achieved in a market which is constantly evolving. This paper presents Central Hudson Gas & Electric Corporations`s experience over the past 4 years implementing and managing a commercial industrial (C/I) efficient lighting rebate program which has been marketed as the Dollar $avers Lighting rebate program.

  12. A review of the Model 5A uranium hexafluoride cylinder

    SciTech Connect (OSTI)

    Dorning, R.E. II

    1989-05-23

    Both the Model 5A (Monel 400) and 5A (Monel 400) Modified five-inch cylinders have been used at the Portsmouth GDP to withdraw, store, and ship highly enriched uranium hexafluoride. As a result of a generic cracking problem with Monel 400 valve-boss material, a cylinder modification was implemented in the mid 1970s. This modification resulted in the violation of the ASME ''Code'' stamp status of the Model 5A Modified cylinder. Hydrostatic testing-to- rupture data indicated that the Model 5A Modified cylinders had ruptured strengths equivalent to that of the original Model 5A cylinders. An independent consultant reviewed the available information and confirmed that the Model 5A Modified cylinders ''will with proper maintenance continue to perform satisfactorily for many additional years of service.'' Based on the test data and consultant's review, DOE approved continued use of the 5A Modified cylinder and also requested procurement of replacement 5B cylinders be expedited. Currently, the 5A modified cylinders are in the production, storage, shipment cycle, and a sufficient number of 5B cylinders has been ordered to accommodate the projected product shipping requirements for the Navy flow. 3 tabs.

  13. Uranium hexafluoride: A manual of good handling practices. Revision 7

    SciTech Connect (OSTI)

    1995-01-01

    The United States Enrichment Corporation (USEC) is continuing the policy of the US Department of Energy (DOE) and its predecessor agencies in sharing with the nuclear industry their experience in the area of uranium hexafluoride (UF{sub 6}) shipping containers and handling procedures. The USEC has reviewed Revision 6 or ORO-651 and is issuing this new edition to assure that the document includes the most recent information on UF{sub 6} handling procedures and reflects the policies of the USEC. This manual updates the material contained in earlier issues. It covers the essential aspects of UF{sub 6} handling, cylinder filling and emptying, general principles of weighing and sampling, shipping, and the use of protective overpacks. The physical and chemical properties of UF{sub 6} are also described. The procedures and systems described for safe handling of UF{sub 6} presented in this document have been developed and evaluated during more than 40 years of handling vast quantities of UF{sub 6}. With proper consideration for its nuclear properties, UF{sub 6} may be safely handled in essentially the same manner as any other corrosive and/or toxic chemical.

  14. In-line assay monitor for uranium hexafluoride

    DOE Patents [OSTI]

    Wallace, Steven A.

    1981-01-01

    An in-line assay monitor for determining the content of uranium-235 in a uranium hexafluoride gas isotopic separation system is provided which removes the necessity of complete access to the operating parameters of the system for determining the uranium-235 content. The monitor is intended for uses such as safeguard applications to assure that weapons grade uranium is not being produced in an enrichment cascade. The method and monitor for carrying out the method involve cooling of a radiation pervious chamber connected in fluid communication with the selected point in the system to withdraw a specimen and solidify the specimen in the chamber. The specimen is irradiated by means of an ionizing radiation source of energy different from that of the 185 keV gamma emissions from the uranium-235 present in the specimen. Simultaneously, the gamma emissions from the uranium-235 of the specimen and the source emissions transmitted through the sample are counted and stored in a multiple channel analyzer. The uranium-235 content of the specimen is determined from the comparison of the accumulated 185 keV energy counts and the reference energy counts. The latter is used to measure the total uranium isotopic content of the specimen. The process eliminates the necessity of knowing the system operating conditions and yet obtains the necessary data without need for large scintillation crystals and sophisticated mechanical designs.

  15. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR...

    Office of Environmental Management (EM)

    3.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this ...

  16. DOE O 413.3A Change 1 - Program and Project Management for the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Change 1 - Program and Project Management for the Acquisition of Capital Assets DOE O 413.3A Change 1 - Program and Project Management for the Acquisition of Capital Assets ...

  17. DOE O 413.3B Program and Project Management for the Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B Program and Project Management for the Acquisition of Capital Assets DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets On November 29, 2016, DOE O ...

  18. INEEL Cultural Resource Management Program Annual Report - 2004

    SciTech Connect (OSTI)

    Clayton F. Marler

    2005-01-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

  19. Biological assessment of the effects of construction and operation of adepleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site.

    SciTech Connect (OSTI)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by

  20. Peer Review of the Federal Energy Management Program Energy-Efficient Product Procurement Portfolio

    Broader source: Energy.gov [DOE]

    Document details the peer review of the Federal Energy Management Program Energy-Efficient Product Procurement portfolio.

  1. NEW - DOE O 361.1C, Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program.

  2. WPN 12-4: Weatherization Assistance Program Financial Management Training Tool Kit

    Broader source: Energy.gov [DOE]

    To issue the Financial Management Training Tool Kit to all Grantee for use in the Weatherization Assistance Program.

  3. CRAD, Emergency Management Program - February 13, 2014 (HSS CRAD 45-60,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rev. 0) | Department of Energy Emergency Management Program - February 13, 2014 (HSS CRAD 45-60, Rev. 0) CRAD, Emergency Management Program - February 13, 2014 (HSS CRAD 45-60, Rev. 0) February 18, 2014 Emergency Management Program (HSS CRAD 45-60, Rev. 0) The focus of this CRAD is determining whether the site has established the appropriate emergency management program based on the technical considerations and methodologies required by DOE 151.1C, including the implementation of Fukushima

  4. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  5. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect (OSTI)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  6. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  7. Aquatic Plant Management Program current status and seasonal workplan

    SciTech Connect (OSTI)

    Burns, E.R.; Bates, A.L.; Webb, D.H.

    1993-07-01

    The objective of the TVA Aquatic Plant Management Program is to support in an environmentally and economically responsible manner, the balanced multiple uses of the water resource of the Tennessee Valley. This is accomplished by following an integrated approach to prevent introduction and spread of noxious species, documenting occurrence and spread of existing species, and suppressing or eliminating problems in designated high use areas. It is not the TVA objective, nor is it biologically feasible and prudent to eliminate all aquatic vegetation. Aerial photography, helicopter reconnaissance, and field surveys are used to assess distributions and abundance of various aquatic macrophytes. Water level fluctuations are supplemented by herbicide applications to control undesirable vegetation. Investigations are conducted to evaluate water level fluctuation schemes, as well as biological, mechanical, and alternative chemical control techniques which offer potential for more environmentally compatible and cost-effective management operations.

  8. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  9. Industrial Program of Waste Management - Cigeo Project - 13033

    SciTech Connect (OSTI)

    Butez, Marc [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France)] [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France); Bartagnon, Olivier; Gagner, Laurent [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France)] [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France); Advocat, Thierry; Sacristan, Pablo [Commissariat a l'energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France)] [Commissariat a l'energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France); Beguin, Stephane [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)] [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  10. High-level waste management technology program plan

    SciTech Connect (OSTI)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  11. Federal Energy Management Program FY14 Budget At-a-Glance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management Program FY14 Budget At-a-Glance Federal Energy Management Program FY14 Budget At-a-Glance Fact sheet describes the Federal Energy Management Program Fiscal Year 2014 budget at-a-glance. Download the FEMP FY14 Budget At-a-Glance fact sheet. (255.8 KB) More Documents & Publications Federal Energy Management Program FY14 Budget At-a-Glance DOE Sustainability Performance Office FY14 Budget At-a-Glance Federal Energy Management Program FY 2017 Budget At-A-Glance

  12. EERE Program Management Guide - Cover and Table of Contents ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    background, management, outreach planning, budget formulation, implementation, analysis and evaluation, and informationbusiness management. Also includes appendices. ...

  13. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-08-18

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  14. Preparing Los Alamos National Laboratory's Waste Management Program for the Future - 12175

    SciTech Connect (OSTI)

    Jones, Scotty W.; Dorries, Alison M.; Singledecker, Steven [Los Alamos National Laboratory, PO Box 1663, Los Alamos, NM 87545 (United States); Henckel, George [Los Alamos Site Office, MS-A316, Los Alamos, NM 87544 (United States)

    2012-07-01

    The waste management program at Los Alamos National Laboratory (LANL) is undergoing significant transition to establish a lean highly functioning waste management program that will succeed the large environmental cleanup waste management program. In the coming years, the environmental cleanup activities will be mostly completed and the effort will change to long-term stewardship. What will remain in waste management is a smaller program focused on direct off-site shipping to cost-effectively enable the enduring mission of the laboratory in support of the national nuclear weapons program and fundamental science and research. It is essential that LANL implement a highly functioning efficient waste management program in support of the core missions of the national weapons program and fundamental science and research - and LANL is well on the way to that goal. As LANL continues the transition process, the following concepts have been validated: - Business drivers including the loss of onsite disposal access and completion of major environmental cleanup activities will drive large changes in waste management strategies and program. - A well conceived organizational structure; formal management systems; a customer service attitude; and enthusiastic managers are core to a successful waste management program. - During times of organizational transition, a project management approach to managing change in a complex work place with numerous complex deliverables is successful strategy. - Early and effective engagement with waste generators, especially Project Managers, is critical to successful waste planning. - A well-trained flexible waste management work force is vital. Training plans should include continuous training as a strategy. - A shared fate approach to managing institutional waste decisions, such as the LANL Waste Management Recharge Board is effective. - An efficient WM program benefits greatly from modern technology and innovation in managing waste data and

  15. Teaching Radioactive Waste Management in an Undergraduate Engineering Program - 13269

    SciTech Connect (OSTI)

    Ikeda, Brian M.

    2013-07-01

    The University of Ontario Institute of Technology is Ontario's newest university and the only one in Canada that offers an accredited Bachelor of Nuclear Engineering (Honours) degree. The nuclear engineering program consists of 48 full-semester courses, including one on radioactive waste management. This is a design course that challenges young engineers to develop a fundamental understanding of how to manage the storage and disposal of various types and forms of radioactive waste, and to recognize the social consequences of their practices and decisions. Students are tasked with developing a major project based on an environmental assessment of a simple conceptual design for a waste disposal facility. They use collaborative learning and self-directed exploration to gain the requisite knowledge of the waste management system. The project constitutes 70% of their mark, but is broken down into several small components that include, an environmental assessment comprehensive study report, a technical review, a facility design, and a public defense of their proposal. Many aspects of the project mirror industry team project situations, including the various levels of participation. The success of the students is correlated with their engagement in the project, the highest final examination scores achieved by students with the strongest effort in the project. (authors)

  16. FIREPLUME model for plume dispersion from fires: Application to uranium hexafluoride cylinder fires

    SciTech Connect (OSTI)

    Brown, D.F.; Dunn, W.E.; Policastro, A.J.; Maloney, D.

    1997-06-01

    This report provides basic documentation of the FIREPLUME model and discusses its application to the prediction of health impacts resulting from releases of uranium hexafluoride (UF{sub 6}) in fires. The model application outlined in this report was conducted for the Draft Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted UF{sub 6}. The FIREPLUME model is an advanced stochastic model for atmospheric plume dispersion that predicts the downwind consequences of a release of toxic materials from an explosion or a fire. The model is based on the nonbuoyant atmospheric dispersion model MCLDM (Monte Carlo Lagrangian Dispersion Model), which has been shown to be consistent with available laboratory and field data. The inclusion of buoyancy and the addition of a postprocessor to evaluate time-varying concentrations lead to the current model. The FIREPLUME model, as applied to fire-related UF{sub 6} cylinder releases, accounts for three phases of release and dispersion. The first phase of release involves the hydraulic rupture of the cylinder due to heating of the UF{sub 6} in the fire. The second phase involves the emission of material into the burning fire, and the third phase involves the emission of material after the fire has died during the cool-down period. The model predicts the downwind concentration of the material as a function of time at any point downwind at or above the ground. All together, five fire-related release scenarios are examined in this report. For each scenario, downwind concentrations of the UF{sub 6} reaction products, uranyl fluoride and hydrogen fluoride, are provided for two meteorological conditions: (1) D stability with a 4-m/s wind speed, and (2) F stability with a 1-m/s wind speed.

  17. Federal Government Energy Management and Conservation Programs Fiscal Year 2008

    SciTech Connect (OSTI)

    None, None

    2014-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  18. Federal Government Energy Management and Conservation Programs Fiscal Year 2009

    SciTech Connect (OSTI)

    None, None

    2014-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  19. Performance Assurance for Multi-Year Contracts Under the Utility Incentive Program; Federal Energy Management Program (FEMP) Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Federal Energy Management Program Leading by example, saving energy and taxpayer dollars in federal facilities Fact Sheet Section 152(f) of the Energy Policy Act of 1992 (EPACT) Public Law 102-486 autho- rized and encouraged Federal agencies to participate in programs to increase energy efficiency and for water conservation or the management of electricity demand conducted by gas, water, or electric utili- ties. Additionally Title 10 Section 2913 and 10 USC 2866 (a) authorizes and

  20. Federal Energy Management Program FY14 Budget At-a-Glance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Federal Energy Management Program FY14 Budget At-a-Glance Federal Energy Management Program FY14 Budget At-a-Glance Federal Energy Management Program FY14 Budget At-a-Glance, a publication of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. femp_ataglance_2014.pdf (255.8 KB) More Documents & Publications Federal Energy Management Program FY14 Budget At-a-Glance DOE Sustainability Performance Office FY14 Budget At-a-Glance Federal Energy Management

  1. DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH.

  2. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  3. DI-MGMT-81861 DOE Changes Version-- Integrated Program Management Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrated Program Management Report (IPMR) combines the Contractor Performance Report (CPR) and Integrated Master Schedule (IMS) reporting requirements on contracts requiring Earned Value Management (EVM) reporting of project/contract performance.

  4. Transcript of See Action and Technical Assistance Program Webinar: Strategic Energy Management

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

  5. Agencies that Have Entered into Federal Energy Management Program Interagency Partnerships

    Broader source: Energy.gov [DOE]

    U.S. Department of Commerce and U.S. Department of the Interior have entered into interagency partnerships with the Federal Energy Management Program.

  6. DOE Orders Self-Study Program- DOE-STD-1073-2003, Configuration Management

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Orders Self-Study Program DOE-STD-1073-2003, Configuration Management Familiar Level - August 2011

  7. Analyzing and Managing Bill Impacts of Energy Efficiency Programs. Principles and Recommendations

    SciTech Connect (OSTI)

    none,

    2011-07-01

    Provides policymakers with principles and recommendations to understand and manage concerns about bill and rate impacts resulting from requiring utilities to provide efficiency programs.

  8. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  9. SEP Success Story: Kentucky Launches State-Wide School Energy Manager Program

    Broader source: Energy.gov [DOE]

    In what could potentially be the first program of its scale, Kentucky has hired a new green team of 35 energy managers. Learn more.

  10. Planning and Implementing a Solarize Initiative: A Guide for State Program Managers

    Broader source: Energy.gov [DOE]

    Solarize is a PV group purchasing program that aims to lower acquisition costs for rooftop solar installations. This Solarize guide features detailed case studies of two particularly well-developed and successful Solarize programs from New England— Solarize Connecticut and Solarize Mass —to help program managers in states across the country develop Solarize programs.

  11. Association of Energy Engineers Certified Energy Manager Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for energy managers, recognizing individuals who have demonstrated high levels of experience, competence, proficiency, and ethical fitness in the energy management profession. ...

  12. Operations Program Management (OPM) Homepage | U.S. DOE Office...

    Office of Science (SC) Website

    What We Do Develops strategic direction and standard procedures for managing infrastructure, security and sustainability. Manages the Science Laboratories Infrastructure (SLI) and ...

  13. Cast Metals Coalition Technology Transfer and Program Management Final Report

    SciTech Connect (OSTI)

    Gwyn, Mike

    2009-03-31

    The Cast Metals Coalition (CMC) partnership program was funded to ensure that the results of the Department of Energy's (DOE) metalcasting research and development (R&D) projects are successfully deployed into industry. Specifically, the CMC program coordinated the transfer and deployment of energy saving technologies and process improvements developed under separately funded DOE programs and projects into industry. The transition of these technologies and process improvements is a critical step in the path to realizing actual energy savings. At full deployment, DOE funded metalcasting R&D results are projected to save 55% of the energy used by the industry in 1998. This closely aligns with DOE's current goal of driving a 25% reduction in industrial energy intensity by 2017. In addition to benefiting DOE, these energy savings provide metalcasters with a significant economic advantage. Deployment of already completed R&D project results and those still underway is estimated to return over 500% of the original DOE and industry investment. Energy savings estimates through December 2008 from the Energy-Saving Melting and Revert Reduction Technology (E-SMARRT) portfolio of projects alone are 12 x 1012 BTUs, with a projection of over 50 x 1012 BTUs ten years after program completion. These energy savings and process improvements have been made possible through the unique collaborative structure of the CMC partnership. The CMC team consists of DOE's Office of Industrial Technology, the three leading metalcasting technical societies in the U.S: the American Foundry Society; the North American Die Casting Association; and the Steel Founders Society of America; and the Advanced Technology Institute (ATI), a recognized leader in distributed technology management. CMC provides collaborative leadership to a complex industry composed of approximately 2,100 companies, 80% of which employ less than 100 people, and only 4% of which employ more than 250 people. Without collaboration

  14. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-07-01

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  15. Program & Project Management For The Acquisition Of Capital Assets

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Engineering and Construction Management Department of Energy Root Cause Analysis Corrective Action Plan ISSUE #3: Strengthen Risk Management November 4, 2009 Paul Bosco, PE, PMP, LEED-AP Director, Office of Engineering and Construction Management (OECM) U. S. Department of Energy Office of Management Office of Engineering and Construction Management 2 * Some Background - GAO High-Risk List - Root Cause Analysis and Corrective Action Plan - Issue Number THREE * Things We Have Done: Risk

  16. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Federal Government Energy Management and Conservation Programs Fiscal Year 2005 September 26, 2006 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY ....................................................................................................E-1 I. Overview of Federal Energy Consumption and Costs ................................................1 A. Standard

  17. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006 November 26, 2008 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY .........................................................................................................E-1 I. OVERVIEW OF FEDERAL ENERGY CONSUMPTION AND COSTS................................ 1

  18. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007 January 27, 2010 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 I. OVERVIEW OF FEDERAL ENERGY CONSUMPTION AND COSTS................................ 1

  19. DOE O 580.1A Department of Energy Personal Property Management Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 580.1A Department of Energy Personal Property Management Program DOE O 580.1A Department of Energy Personal Property Management Program The Department issued a Contractor Requirements Document (CRD) for the subject Directive on March 30, 2012. PF2012-33 DOE O 580.1A, DOE Personal Property Management Program (22.38 KB) More Documents & Publications Implementation of DOE Order 580.1A, Department of Energy Personal Property Management DOE O 551.1D Official Foreign

  20. High-voltage electrical apparatus utilizing an insulating gas of sulfur hexafluoride and helium

    DOE Patents [OSTI]

    Wootton, Roy E.

    1980-01-01

    High-voltage electrical apparatus includes an outer housing at low potential, an inner electrode disposed within the outer housing at high potential with respect thereto, and support means for insulatably supporting the inner electrode within the outer housing. Conducting particles contaminate the interior of the outer housing, and an insulating gas electrically insulates the inner electrode from the outer housing even in the presence of the conducting particles. The insulating gas is comprised of sulfur hexafluoride at a partial pressure of from about 2.9 to about 3.4 atmospheres absolute, and helium at a partial pressure from about 1.1 to about 11.4 atmospheres absolute. The sulfur hexafluoride comprises between 20 and 65 volume percent of the insulating gas.

  1. EERE Program Management Guide - Cover and Table of Contents

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 8.6 Other EERE Information and Business Management Tools ......8-19 8.7 Electronic Government ......

  2. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2010 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Department of Energy |March 2014 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2010. This report on Federal energy management for FY 2010 provides information on energy consumption in Federal

  3. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2011 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2011. This report on Federal energy management for FY 2011 responds to section 548 of the National Energy Conservation Policy Act (NECPA; Pub. L.

  4. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012 Report to Congress May 2015 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2012. This report on Federal energy management for FY 2012 provides information on energy consumption in Federal buildings, operations, and vehicles,

  5. Office of Legacy Management (LM) Program Update, October¬タモDecember 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 - Visit us at www.lm.doe.gov Welcome to the October-December 2010 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management See page for a map of LM sites. 14 See page 15 for a more detailed version of LM's goals. Legacy Management Goals Goal 5 Office of Legacy Management Receives Management

  6. Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1999

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1999 January 11, 2001 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 i TABLE OF CONTENTS EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 I. OVERVIEW OF FEDERAL ENERGY MANAGEMENT ACTIVITIES . . 7 A. Overview of Federal Energy Management Policy and Legislative Mandates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  7. EIS-0182: Western Area Power Administration Energy Planning and Management Program

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

  8. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    SciTech Connect (OSTI)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  9. EERE Guide for Managing General Program Evaluation Studies-- Appendix 11

    Broader source: Energy.gov [DOE]

    The American Evaluation Association developed the ethical principles in this Appendix to guide the professional practice of evaluators. EERE expects evaluation experts who perform general program evaluations of its programs to be governed by these principles.

  10. Managing Supply Chain Key for Hawaii Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Hawaii's appliance rebate program delivered 4,300 rebates to Hawaiians in just three days. And on just the first day of program, almost 4,000 ENERGY STAR qualified refrigerators were sold.

  11. EERE Program Management Guide - Chapter 8 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the EERE information system, WinSAGA, electronic government, and other EERE information and business management tools. pmguidechapter8.pdf (1.67 MB) More Documents & ...

  12. Senior Technical Safety Manager Qualification Program Self-Assessment...

    Energy Savers [EERE]

    In accordance CNS Standard Operating Procedure SOP-016, Senior Technical Safety Manager ... More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - ...

  13. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Management

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  14. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  15. Mr. William R. Augustine Deputy Chief Programs Management Division

    Office of Legacy Management (LM)

    ... site was used for activities which supported the Nation' s early atomic energy program; . ... Shall maintain records of determination of eligibility and other files, documents and ...

  16. Mr. William R. Augustine Deputy Chief Programs Management Division

    Office of Legacy Management (LM)

    ... site was used for activities which supported the Nation' s early atomic energy program; . ... Shall maintain records of determination of eligibility and other files documents and ...

  17. Appendix I: GPRA07 Federal Energy Management Program documentation

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    This document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2007 Budget Request.

  18. EERE Program Management Guide - Chapter 4 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 of this guide provides information on the stages of planning and planning guidelines. Includes information on EERE strategic planning, multi-year program planning and ...

  19. Oak Ridge Environmental Management Program Completes Work at...

    Broader source: Energy.gov (indexed) [DOE]

    program recently completed upgrades and soil remediation work at the Bethel Valley ... and 3. This included removing contaminated soil ("hot spots"), diverting clean groundwater ...

  20. Federal Energy Management Program Renewable Energy Project Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the course of the project development cycle. This includes technical assistance during the following phases. Planning Phase Policy and program support Prescreening Screening ...

  1. Patch and Update Management Program for Energy Delivery Systems

    Office of Environmental Management (EM)

    ... (R&D) program, which aims to enhance the reliability and resilience of the nation's energy infrastructure by reducing the risk of energy disruptions due to cyber attacks. ...

  2. ENERGY STAR Portfolio Manager and Utility Benchmarking Programs...

    Broader source: Energy.gov (indexed) [DOE]

    Adoption (Presentation) H2 and You: The Hydrogen Education Foundation's Outreach Program (Presentation) Energy Storage Systems 2012 Peer Review Presentations - Day 1, Session 3...

  3. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACILITIES | Department of Energy 3.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the

  4. Federal Energy Management Program FY 2015 Budget At-A-Glance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 5 Budget At-A-Glance Federal Energy Management Program FY 2015 Budget At-A-Glance The Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations by bringing expertise from all levels of project and policy implementation to enable federal agencies to meet energy-related goals and provide energy leadership to the country. fy15_at-a-glance_femp.pdf (440.32 KB) More Documents & Publications Federal Energy Management Program

  5. DOE O 413.3B Program and Project Management for the Acquisition of Capital

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assets | Department of Energy B Program and Project Management for the Acquisition of Capital Assets DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets On November 29, 2016, DOE O 413.3B was updated to replace DOE O 413.3A, Chg 1, dated June 28, 2006, and includes a Contractor Requirements Document (CRD). PF2011-35 DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets (613.53 KB) More Documents & Publications Acquisition Guide

  6. Program Management at the National Nuclear Security Administration Office of Defense Nuclear Security: A Review of Program Management Documents and Underlying Processes

    SciTech Connect (OSTI)

    Madden, Michael S.

    2010-05-01

    The scope of this paper is to review the National Nuclear Security Administration Office of Defense Nuclear Security (DNS) program management documents and to examine the underlying processes. The purpose is to identify recommendations for improvement and to influence the rewrite of the DNS Program Management Plan (PMP) and the documentation supporting it. As a part of this process, over 40 documents required by DNS or its stakeholders were reviewed. In addition, approximately 12 other documents produced outside of DNS and its stakeholders were reviewed in an effort to identify best practices. The complete list of documents reviewed is provided as an attachment to this paper.

  7. Urban energy management: a course on the administration of public energy programs. An instructor's guide

    SciTech Connect (OSTI)

    Mandelbaum, Dr., Len; Olsen, Dr., Marvin; Hyman, Dr., Barry; Sheridan, Mimi; Dahlberg, Judy; O'Brien, Jeremy

    1980-12-01

    The course provides local government administrators, staff, and students with the background knowledge to deal with a broad range of energy management concerns and is not to train technical energy conservation specialists. Section II contains the Instructor's Guide and Section III provides the Student Outlines and Handouts on the following subjects: The Energy Problem; National Energy Politics and Programs; State and Local Energy Programs; Techniques of Energy Planning; Techniques of Energy Conservation; Techniques of Renewable Energy Production; Strategies for Voluntary Energy Management; Strategies for Finan. Energy Management; and Strategies for Mandatory Energy Management. (MCW)

  8. Management of National Nuclear Power Programs for assured safety

    SciTech Connect (OSTI)

    Connolly, T.J.

    1985-01-01

    Topics discussed in this report include: nuclear utility organization; before the Florida Public Service Commission in re: St. Lucie Unit No. 2 cost recovery; nuclear reliability improvement and safety operations; nuclear utility management; training of nuclear facility personnel; US experience in key areas of nuclear safety; the US Nuclear Regulatory Commission - function and process; regulatory considerations of the risk of nuclear power plants; overview of the processes of reliability and risk management; management significance of risk analysis; international and domestic institutional issues for peaceful nuclear uses; the role of the Institute of Nuclear Power Operations (INPO); and nuclear safety activities of the International Atomic Energy Agency (IAEA).

  9. Federal Energy Management Program Training | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Read more Complete sets of accredited courses for comprehensive instruction on timely energy-management topics. Read more New eTraining course explains how to get more out of...

  10. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect (OSTI)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  11. Accreditation Management of Superior Energy Performance Program to Transition Solely to ANAB in 2016

    Broader source: Energy.gov [DOE]

    Since its inception, Superior Energy Performance (SEP) program accreditation has been jointly managed by both the American National Standards Institute (ANSI) and the ANSI-ASQ National...

  12. Program Managers Questions for LL13-MatModelRadDetect-2Jf (Technical...

    Office of Scientific and Technical Information (OSTI)

    Program Managers Questions for LL13-MatModelRadDetect-2Jf Citation Details In-Document ... DOE Contract Number: AC52-07NA27344 Resource Type: Technical Report Research Org: Lawrence ...

  13. 33 U.S.C. 1329 - Nonpoint Source Management Programs | Open Energy...

    Open Energy Info (EERE)

    of the United States Code provides for nonpoint source management programs under the Clean Water Act. Published NA Year Signed or Took Effect 2002 Legal Citation 33 U.S.C....

  14. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  15. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect (OSTI)

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  16. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-09

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Admin Chg 1, dated 6-14-13, supersedes DOE G 433.1-1A.

  17. Senior Technical Safety Manager Qualification Program Self-Assessment- Chief of Nuclear Safety

    Broader source: Energy.gov [DOE]

    This Chief of Nuclear Safety (CNS) Report was prepared to summarize the results of the July 2013 CNS self-assessment of the Senior Technical Safety Manager Qualification Program.

  18. Department of Energy to Continue Managing Uranium Leasing Program in Western Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) released its Record of Decision for the Programmatic Environmental Impact Statement (PEIS), announcing that it will continue managing the Uranium Leasing Program for another 10 years.

  19. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  20. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-12

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Cancels DOE G 433.1-1.

  1. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Broader source: Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  2. EERE Guide for Managing General Program Evaluation Studies-- Appendix 8

    Broader source: Energy.gov [DOE]

    This Statement of Work (SOW) for a general program evaluation consists of a description of the objectives of the evaluation and specifications on how the objectives should be achieved.

  3. Program and Project Management for the Acquisition of Capital Assets -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Update: 2nd Quarter 2016 Program Update: 2nd Quarter 2016 Inside this Update: 2016-2025 Strategic Plan Released; Little Wind River Floods at Riverton, Wyoming: Study to Determine Impacts on Soil Contaminants; Monument Valley Open House; Retiring LM Director Recognized with Exceptional Service Award; New Acting LM Director Appointed; LM Business Center Hosts Office of Environment, Health, Safety and Security (AU-14) Representatives; Annual Assessment Shows Mound, Ohio, Site ICs Are

  4. DOE O 243.1B, Records Management Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O 243.1B, Records Management Program DOE O 243.1B, Records Management Program To set forth requirements and responsibilities for creating and preserving records containing adequate and proper documentation of the organization, functions, policies, decisions, procedures, and essential transactions of the Department of Energy (DOE) and to provide information necessary to protect the legal and financial rights of the government and persons directly affected by DOE activities. See 44 United States

  5. DOE Order Program and Project Management for the Acquisition of Capital

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assets | Department of Energy Safety » DOE Order Program and Project Management for the Acquisition of Capital Assets DOE Order Program and Project Management for the Acquisition of Capital Assets The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan, implement and complete their assigned project(s) using a Systems Engineering approach. DOE Order

  6. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013 Report to Congress April 2015 United States Department of Energy Washington, DC 20585 1 ii Department of Energy |April 2015 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2013. The Federal Government is the largest single energy consumer in the Nation, presenting significant

  7. Attendees: John Cymbalsky, Equipment and Appliance Standards Program Manager, Building Technologies Office,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lutron ex-parte meeting at DOE Pekka Hakkarainen 11 February 2015 Page 1 of 4 Lutron Electronics Co., Inc. ex-parte meeting at the U.S. Department of Energy Subject: LED drivers are not external power supplies Meeting date: 11 February 2015 Attendees: John Cymbalsky, Equipment and Appliance Standards Program Manager, Building Technologies Office, DOE Jeremy Dommu, Project Manager, Equipment and Appliance Standards Program, Building Technologies Office, DOE Laura Barhydt, Assistant General

  8. The FEMP Awards Program: Fostering Institutional Change and Energy Management Excellence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PNNL-23318 The FEMP Awards Program: Fostering Institutional Change and Energy Management Excellence May 2014 C McDermott EL Malone PNNL-23318 The FEMP Awards Program: Fostering Institutional Change and Energy Management Excellence C McDermott EL Malone May 2014 Prepared for the U.S. Department of Energy under Contract DEAC0576RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 PNNL-23318 Summary This report assesses the use of institutional change principles and the

  9. Management of radioactive material safety programs at medical facilities. Final report

    SciTech Connect (OSTI)

    Camper, L.W.; Schlueter, J.; Woods, S.

    1997-05-01

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized users and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.

  10. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  11. Program and Project Management for the Acquisition of Capital Assets (Informational Purposes Only)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-01-11

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. The Page Change is a limited update to incorporate recent Secretarial policies and issues raised by external stakeholders.

  12. DOE`s integrated low-level waste management program and strategic planning

    SciTech Connect (OSTI)

    Duggan, G.; Hwang, J.

    1993-03-01

    To meet the DOE`s commitment to operate its facilities in a safe, economic, and environmentally sound manner, and to comply with all applicable federal, state, and local rules, regulations, and agreements, DOE created the Office of Environmental Restoration and Waste Management (EM) in 1989 to focus efforts on controlling waste management and cleaning up contaminated sites. In the first few years of its existence, the Office of Waste Management (EM-30) has concentrated on operational and corrective activities at the sites. In 1992, the Office of Waste Management began to apply an integrated approach to managing its various waste types. Consequently, DOE established the Low-Level Waste Management Program (LLWMP) to properly manage its complex-wide LLW in a consistent manner. The objective of the LLWMP is to build and operate an integrated, safe, and cost-effective program to meet the needs of waste generators. The program will be based on acceptable risk and sound planning, resulting in public confidence and support. Strategic planning of the program is under way and is expected to take two to three years before implementation of the integrated waste management approach.

  13. Independent Oversight Review of the Uranium Processing Facilkity Design Requirements and Configuration Management Program, March 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Review of the Uranium Processing Facility Design Requirements and Configuration Management Program March 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Background ...

  14. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming The genepool system has a diverse set of software development tools and a rich environment for delivering their functionality to users. Genepool has adopted a modular system which has been adapted from the Programming Environments similar to those provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu/4.6". The "gnu" indicates that it is providing the GNU environment, principally GCC,

  15. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Energy Management and Conservation Programs Fiscal Year 2008 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary This letter report on Federal energy management for fiscal year (FY) 2008 provides information on energy consumption in Federal buildings, operations, and vehicles, and documents activities conducted by Federal agencies under:  The energy management and energy consumption reduction

  16. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Energy Management and Conservation Programs Fiscal Year 2009 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary This letter report on Federal energy management for fiscal year (FY) 2009 provides information on energy consumption in Federal buildings, operations, and vehicles, and documents activities conducted by Federal agencies under:  The energy management and energy consumption reduction

  17. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Conservation Programs Fiscal Year 2004 February 24, 2006 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS I. Overview of Federal Energy Consumption and Costs . . . . . . . . . . . . . . . . . . . . . . . 1 A. Standard Buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 B. Industrial, Laboratory and Other Energy Intensive

  18. Moderation control in low enriched {sup 235}U uranium hexafluoride packaging operations and transportation

    SciTech Connect (OSTI)

    Dyer, R.H.; Kovac, F.M.; Pryor, W.A.

    1993-10-01

    Moderation control is the basic parameter for ensuring nuclear criticality safety during the packaging and transport of low {sup 235}U enriched uranium hexafluoride before its conversion to nuclear power reactor fuel. Moderation control has permitted the shipment of bulk quantities in large cylinders instead of in many smaller cylinders and, therefore, has resulted in economies without compromising safety. Overall safety and uranium accountability have been enhanced through the use of the moderation control. This paper discusses moderation control and the operating procedures to ensure that moderation control is maintained during packaging operations and transportation.

  19. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  20. Inspection of Emergency Management Programs at the Argonne National Laboratory- East, Volume II, May 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health and emergency management programs at the Department of Energy’s (DOE) Argonne National Laboratory – East (ANL-E) in April and May 2002. The OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight performed the inspection as a joint effort. This volume discusses the results of the review of the ANL-E emergency management program. The results of the review of the ANL-E environment, safety, and health programs are discussed in Volume I of this report, and the combined results are discussed in the summary report. This OA evaluation found an emergency management program in a state of transition resulting from the recent organizational, personnel, and programmatic changes. ANL has developed hazards assessments that generally serve as a good foundation for the emergency management program for the events that were analyzed, and in most cases the ICs and the emergency response center (ERC) team appropriately considered protective actions and took actions to mitigate the postulated event. Section 2 of this report provides an overall discussion of the results that characterize the ANL-E emergency management program elements that were evaluated. Section 3 provides OA’s conclusions regarding the overall effectiveness of the program. Section 4 presents the ratings assigned as a result of this review. Appendix A provides supplemental information, including team member composition. Appendix B identifies the findings that require corrective actions and follow-up. Appendices C through F detail the results of the reviews of individual emergency management program elements.

  1. Office of Legacy Management (LM) Program Update, April¬タモJune 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    p r i l - J u n e 2 0 1 1 Visit us at www.lm.doe.gov Welcome to the April-June 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . lm@hq.doe.gov Program Update Legacy Management On May 31, 2011, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) completed a comprehensive 18-month effort to evaluate the

  2. Office of Legacy Management (LM) Program Update, April¬タモJune 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 - Visit us at www.lm.doe.gov Welcome to the April-June 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management U.S. Representative Scott Tipton of Colorado's 3rd Congressional District visited the U.S. Department of Energy Office of Legacy Management (LM) Grand Junction, site in

  3. Office of Legacy Management (LM) Program Update, January¬タモMarch 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 - Visit us at www.lm.doe.gov Welcome to the January-March 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management In February 2011, the Office of Legacy Management (LM) began work as part of an interagency effort to develop a design for the disposal of material from the Northeast Church

  4. Office of Legacy Management (LM) Program Update, July¬タモSeptember 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 - Visit us at www.lm.doe.gov Welcome to the July-September 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management On July 27, 2011, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) completed the long-term monitoring of Amchitka Island, an event that occurs once

  5. Office of Legacy Management (LM) Program Update: July¬タモSeptember 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Visit us at www.lm.doe.gov Welcome to the July-September 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . lm@hq.doe.gov Program Update Legacy Management Goal 2 LM Communication and Stakeholder Satisfaction Independent Survey The U.S. Department of Energy Office of Legacy Management is currently conducting a community and

  6. Federal Energy Management Program FY 2016 Budget At-A-Glance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 6 Budget At-A-Glance Federal Energy Management Program FY 2016 Budget At-A-Glance The Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations by bringing expertise at all levels of project and policy implementation to enable federal agencies to meet energy-related goals and provide energy leadership to the country. FEMP FY 2016 Budget At-A-Glance (457.41 KB) More Documents & Publications Federal Energy Management

  7. Summary of non-US national and international radioactive waste management programs 1980

    SciTech Connect (OSTI)

    Harmon, K.M.; Kelman, J.A.; Stout, L.A.; Hsieh, K.A.

    1980-03-01

    Many nations and international agencies are working to develop improved technology and industrial capability for nuclear fuel cycle and waste management operations. The effort in some countries is limited to research in university laboratories on treating low-level waste from reactor plant operations. In other countries, national nuclear research institutes are engaged in major programs in all phases of the fuel cycle and waste management, and there is a national effort to commercialize fuel cycle operations. Since late 1976, staff members of Pacific Northwest Laboratory have been working under US Department of Energy sponsorship to assemble and consolidate openly available information on foreign and international nuclear waste management programs and technology. This report summarizes the information collected on the status of fuel cycle and waste management programs in selected countries making major efforts in these fields as of the end of January 1980.

  8. Summary of non-US national and international radioactive waste management programs 1981

    SciTech Connect (OSTI)

    Harmon, K.M.; Kelman, J.A.

    1981-06-01

    Many nations and international agencies are working to develop improved technology and industrial capability for neuclear fuel cycle and waste management operations. The effort in some countries is limited to research in university laboratories on treating low-level waste from reactor plant operations. In other countries, national nuclear research institutes are engaged in major programs in all phases of the fuel cycle and waste management, and there is a national effort to commercialize fuel cycle operations. Since late 1976, staff members of Pacific Northwest Laboratory have been working under US Department of Energy sponsorship to assemble and consolidate openly available information on foreign and international nuclear waste management programs and technology. This report summarizes the information collected on the status of fuel cycle and waste management programs in selected countries making major efforts in these fields as of the end of May 1981.

  9. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

  10. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

  11. Department of Energy Science Offices, Programs and Allocation Managers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Department of Energy Savannah River Site 2015 Small Business Forum Department of Energy Savannah River Site 2015 Small Business Forum June 29, 2016 - 2:00pm Addthis The Department of Energy Office of Environmental Management, Savannah River Site and the Savannah River National Laboratory hosted a Small Business Forum on May 19, 2016. The purpose of the forum was to better recognize innovative technologies with the potential to improve operational performance and reduce

  12. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  13. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-28

    The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

  14. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-18

    To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

  15. The USDOE Office of Fossil Energy Waste Management Program: An overview

    SciTech Connect (OSTI)

    Harness, J.L.

    1994-06-01

    The Department of Energy Office of Fossil Energy Waste Management Program is a small but active program with a focus on management issues for the solid residues produced by advanced coal technologies. The three major project areas are characterization of by-products, disposal management issues, and utilization of by-products. The utilization area can be subdivided into projects looking at land management utilization technologies, management of byproducts in underground mines to address environmental problems, and other utilization technology. As can be seen, there is a focus in the utilization area on utilization technology for large volumes of material. For all project areas, there is an emphasis on cost-shared work which serves as an indicator of private industry and state governments interest in and commitment to commercialization of technologies.

  16. Forms Management Guide for use with DOE O 200.1, Information Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-05-08

    Provides guidance for the development, analysis, approval, and management of forms in the U.S. Department of Energy (DOE). No cancellations.

  17. Savannah River Site Waste Management Program Plan, FY 1993. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

  18. Industrial demand-side management programs: What`s happened, what works, what`s needed

    SciTech Connect (OSTI)

    Jordan, J.A.; Nadel, S.M.

    1993-03-01

    In order to analyze experience to date with industrial demand-side management (DSM), a survey of utilities was conducted and a database of industrial DSM programs was prepared. More than eighty utilities and third-party organizations were interviewed. Data were collected via phone, fax, and/or mail from the utilities and entered into a database. In order to limit the scope of this study, the database contains incentive-based, energy-saving programs and not load management or information-only programs (including technical assistance programs). Programs in the database were divided into four categories: two ``prescriptive rebate`` categories and two ``custom rebate`` categories. The database contains 31 incentive-based, energy-saving industrial DSM programs offered by 17 utilities. The appendix to this report summarizes the results approximately 60 industrial DSM programs. Most of the programs included in the appendix, but not in the database, are either C&I programs for which commercial and industrial data were not disaggregated or new industrial DSM programs for which data are not yet available.

  19. Huntington Veterans Affairs Medical Center - Faucet and Showerhead Replacement Project: Best Management Practice Case Study #7: Faucets and Showerheads, Federal Energy Management Program (FEMP) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-12-01

    Case study overview of the Huntington Veterans Affairs Medical Center water efficiency program as part of FEMP's water efficiency best management practice series.

  20. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  1. Corporate planning for compliance with EPA`s proposed risk management program rule

    SciTech Connect (OSTI)

    Mannan, M.; Keeney, R.C.

    1995-12-31

    On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

  2. Demand-side management program evaluation and the EPA Conservation Verification Protocols. Final report

    SciTech Connect (OSTI)

    Willems, P.; Ciraulo, J.; Smith, B.

    1993-11-01

    The US Environmental Protection Agency (EPA) Conservation Verification Protocols (CVPs) are a set of step-by-step procedures for impact monitoring and evaluation of electric utility demand-side management (DSM) programs. The EPA developed these protocols as part of its mission to implement the Acid Rain Program authorized by Title IV of the Clean Air Amendments of 1990. This report provides an overview of the CVPs and how they can be used by electric utilities in DSM program monitoring and evaluation. Both the CVPs Monitoring Path and Stipulated Path procedures are summarized and reviewed. Several examples are provided to illustrate how to calculate DSM program energy savings using the CVPSs.

  3. FEMP (Federal Energy Management Program) presents alternative financing guidance memoranda

    SciTech Connect (OSTI)

    1998-06-01

    Utility financing of energy efficient measures becomes easier to accomplish with the two new alternative financing guidance memoranda, released April 17, 1998, that address the use of utility incentives for Federal facilities. The memoranda have been approved by the Alternative Financing Guidance Committee on the Interagency Energy Management Task Force. The memoranda include: (1) Policy Statement No. 001: Authority to Sole Source Utility Service Contracts as Referenced in Section 152 of the Energy Policy Act (EPACT) of 1992; and (2) Policy Statement No. 002: Congressional Notification for Utility Projects Under the Authority of Section 152 of the Energy Policy Act (EPACT) of 1992. The purpose for developing the financing memoranda was to address specific issues within current Federal procurement regulations that require clarification or guidance. This new guidance will allow for increased use of utility incentives as a means of financing energy efficient and life cycle cost-effective projects in Federal facilities.

  4. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect (OSTI)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  5. Why industry demand-side management programs should be self-directed

    SciTech Connect (OSTI)

    Pritchett, T.; Moody, L. ); Brubaker, M. )

    1993-11-01

    U.S. industry believes in DSM. But it does not believe in the way DSM is being implemented, with its emphasis on mandatory utility surcharge/rebate programs. Self-directed industrial DSM programs would be better for industry - and for utilities as well. Industrial demand-side management, as it is currently practiced, relies heavily on command-and-control-style programs. The authors believe that all parties would benefit if utilities and state public service commissions encouraged the implementation of [open quotes]self-directed[close quotes] industrial DSM programs as an alternative to these mandatory surcharge/rebate-type programs. Here the authors outline industrial experience with existing demand-side management programs, and offer alternative approaches for DSM in large manufacturing facilities. Self-directed industrial programs have numerous advantages over mandatory utility-funded and sponsored DSM programs. Self-directed programs allow an industrial facility to use its own funds to meet its own specific goals, whether they are set on the basis of demand reduction, energy use reduction, spending levels for DSM and environmental activities, or some combination of these or other readily measurable criteria. This flexibility fosters a higher level of cost effectiveness, a more focused and effective approach for optimizing energy usage, larger emission reductions per dollar of expenditure, and more competitive industrial electric rates.

  6. Proceedings of the Third Annual Information Meeting DOE Low-Level Waste-Management Program

    SciTech Connect (OSTI)

    Large, D.E.; Lowrie, R.S.; Stratton, L.E.; Jacobs, D.G.

    1981-12-01

    The Third Annual Participants Information Meeting of the Low-Level Waste Management Program was held in New Orleans, Louisiana, November 4-6, 1981 The specific purpose was to bring together appropriate representatives of industry, USNRC, program management, participating field offices, and contractors to: (1) exchange information and analyze program needs, and (2) involve participants in planning, developing and implementing technology for low-level waste management. One hundred seven registrants participated in the meeting. Presentation and workshop findings are included in these proceedings under the following headings: low-level waste activities; waste treatment; shallow land burial; remedial action; greater confinement; ORNL reports; panel workshops; and summary. Forty-six papers have been abstracted and indexed for the data base.

  7. Spent Nuclear Fuel Project document control and Records Management Program Description

    SciTech Connect (OSTI)

    MARTIN, B.M.

    2000-05-18

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

  8. U.S. Department of Energy, Office of Legacy Management Program Update, April-June 2009

    SciTech Connect (OSTI)

    2009-04-01

    Welcome to the April-June 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. The Legacy Management goals are: (1) Protect human health and the environment through effective and efficient long-term surveillance and maintenance - This goal highlights DOE's responsibility to ensure long-term protection of people, the environment, and the integrity of engineered remedies and monitoring systems. (2) Preserve, protect, and make accessible legacy records and information - This goal recognizes LM's commitment to successfully manage records, information, and archives of legacy sites under its authority. (3) Support an effective and efficient work force structured to accomplish Departmental missions and assure continuity of contractor worker pension and medical benefits - This goal recognizes DOE's commitment to its contracted work force and the consistent management of pension and health benefits. As sites continue to close, DOE faces the challenges of managing pension plan and health benefits liability. (4) Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition - This goal recognizes a DOE need for local collaborative management of legacy assets, including coordinating land use planning, personal property disposition to community reuse organizations, and protecting heritage resources (natural, cultural, and historical). (5) Improve program effectiveness through sound management - This goal recognizes that LM's goals cannot be attained efficiently unless the federal and contractor work force is motivated to meet requirements and work toward continuous performance improvement.

  9. Supplement Analysis for the Transmission System Vegetation Management Program FEIS

    SciTech Connect (OSTI)

    N /A

    2001-03-27

    BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa--Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. (1) Description of right-of-way and vegetation management needed--The project involves cutting all tall growing trees and brush within BPA's 100-foot wide transmission line right-of-way. An encroachment by the City of Bend Sewer Treatment facility, and future expansion plans, compelled the relocation of this portion of the right-of-way. Structures 18/2 and 18/4 will be modified in place to accommodate the new angle of the right-of-way. Structure 18/3 will be moved approximately 300 feet westerly to allow for the expansion of the sewer treatment facility. Only vegetation within the new portion of the right-of-way, totaling approximately 3.5 acres, will be controlled. No herbicides will be used on this project. Vegetation to be controlled: Juniper trees are the only tall growing tree species within this portion of the right-of-way requiring treatment. The density of vegetation within the new right-of-way is light to medium. The right-of-way boundaries will be examined for danger trees and if found, danger trees will be marked and cut according to danger tree policy.

  10. Tulsa District Projects Impacting Federal Power Programs and Project Management Division

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tulsa District Projects Impacting Federal Power Programs and Project Management Division Tulsa District 22 June 2016 BUILDING STRONG ® Interior Least Tern Operations and Habitat Management  Interior Least Tern (ILT) proposed for de-listing. Timeframe uncertain. Until delisted, all Endangered Species Act requirements still apply.  Revised Biological Opinion (BO) covering SWT, SWL, and SWPA to be provided by Fish and Wildlife Service (estimated June 2016). Need for revision primarily driven

  11. HEALXH AND SAFEIY RFSEARCH DIVISION Waste Management Research and Development Programs

    Office of Legacy Management (LM)

    HEALXH AND SAFEIY RFSEARCH DIVISION Waste Management Research and Development Programs (Activity No. AH 10 05 00 0; NEAHC01) RADIOLOGICAL SURVEY OFTHE FORMER AEROPROJECTS, FACILITY, WEST cI%mER, PENNSYL.VANIA W. D. Cottrell and R. F. Carrier Date published - October 1990 Investigation Team R. E. Swaja - Measurement Applications and Development Manager W. D. Cottrell - NSRAP Project Director Suwey Team Members J. A Roberts* J. L. Quillent l Bechtel National, Inc tNuclear Fuel Services, Inc Work

  12. National low-level waste management program radionuclide report series, Volume 15: Uranium-238

    SciTech Connect (OSTI)

    Adams, J.P.

    1995-09-01

    This report, Volume 15 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of uranium-238 ({sup 238}U). The purpose of the National Low-Level Waste Management Program Radionuclide Report Series is to provide information to state representatives and developers of low-level radioactive waste disposal facilities about the radiological, chemical, and physical characteristics of selected radionuclides and their behavior in the waste disposal facility environment. This report also includes discussions about waste types and forms in which {sup 238}U can be found, and {sup 238}U behavior in the environment and in the human body.

  13. Office of Legacy Management (LM) Program Update, January¬タモMarch 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 - Visit us at www.lm.doe.gov Welcome to the January-March 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management Contracts were recently awarded to two charter vessels that will transport equipment and personnel to the island of Amchitka, Alaska, for the 2011 biological sampling and

  14. Federal Energy Management Program FY 2017 Budget At-A-Glance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy About Us » Federal Energy Management Program FY 2017 Budget At-A-Glance Federal Energy Management Program FY 2017 Budget At-A-Glance With more than 350,000 buildings and 600,000 vehicles, the federal government is America's largest single energy consumer. There is a tremendous opportunity and responsibility to lead by example in cutting energy waste and advancing America's clean energy future. The progress the federal government has made to date, through public-private

  15. 5 Questions about the SunShot Prize for Minh Le - Solar Program Manager

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at the U.S. Energy Department | Department of Energy Questions about the SunShot Prize for Minh Le - Solar Program Manager at the U.S. Energy Department 5 Questions about the SunShot Prize for Minh Le - Solar Program Manager at the U.S. Energy Department September 24, 2012 - 1:46pm Addthis The Energy Department launched the SunShot Prize competition, which offers cash awards for the top three teams that demonstrate non-hardware costs no higher than $1 per watt for small-scale photovoltaic

  16. DOE O 413.3A Change 1 - Program and Project Management for the Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Capital Assets | Department of Energy A Change 1 - Program and Project Management for the Acquisition of Capital Assets DOE O 413.3A Change 1 - Program and Project Management for the Acquisition of Capital Assets PF2009-10.pdf (383.55 KB) More Documents & Publications Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Issue a New Department of Energy Acquisition Guide Chapter 6.5 Competition Advocate

  17. Mixed Waste Management Options: 1995 Update. National Low-Level Waste Management Program

    SciTech Connect (OSTI)

    Kirner, N.; Kelly, J.; Faison, G.; Johnson, D.

    1995-05-01

    In the original mixed Waste Management Options (DOE/LLW-134) issued in December 1991, the question was posed, ``Can mixed waste be managed out of existence?`` That study found that most, but not all, of the Nation`s mixed waste can theoretically be managed out of existence. Four years later, the Nation is still faced with a lack of disposal options for commercially generated mixed waste. However, since publication of the original Mixed Waste Management Options report in 1991, limited disposal capacity and new technologies to treat mixed waste have become available. A more detailed estimate of the Nation`s mixed waste also became available when the US Environmental Protection Agency (EPA) and the US Nuclear Regulatory Commission (NRC) published their comprehensive assessment, titled National Profile on Commercially Generated Low-Level Radioactive Mixed Waste (National Profile). These advancements in our knowledge about mixed waste inventories and generation, coupled with greater treatment and disposal options, lead to a more applied question posed for this updated report: ``Which mixed waste has no treatment option?`` Beyond estimating the volume of mixed waste requiring jointly regulated disposal, this report also provides a general background on the Atomic Energy Act (AEA) and the Resource Conservation and Recovery Act (RCRA). It also presents a methodical approach for generators to use when deciding how to manage their mixed waste. The volume of mixed waste that may require land disposal in a jointly regulated facility each year was estimated through the application of this methodology.

  18. North American Governments Announce Pilot Program to Accelerate Regional Adoption of the Energy Management Standard ISO 50001

    Broader source: Energy.gov [DOE]

    Today, energy ministries from Canada, Mexico, and the United States announced that nine companies will join the North American Energy Management Pilot Program to promote implementation of the ISO 50001 international energy management system standard.

  19. Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-06-12

    Recommendations from the DOE Field Management Council (FMC), NEPA Improvement Team, and the Council on Environmental Quality (CEQ) for improving NEPA compliance through the integration of Program ad Project Management

  20. Association of Energy Engineers Certified Energy Manager Program Becomes First Credential Recognized under Better Buildings Workforce Guidelines

    Office of Energy Efficiency and Renewable Energy (EERE)

    This week, the Department announced that the Association of Energy Engineers’ (AEE) Certified Energy Manager® is the first certification program to be recognized under the Better Buildings Workforce Guidelines program.