National Library of Energy BETA

Sample records for headquarters physical protection

  1. Office of Physical Protection

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Physical Protection is comprised of a team of security specialists engaged in providing Headquarters-wide physical protection.

  2. Headquarters Facilities Master Security Plan- Chapter 1, Physical Security

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 1, Physical Security Describes DOE Headquarters Physical Security procedures related to badges, inspections, access controls, visitor controls, and removal of government property.

  3. Physical Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    This Manual establishes requirements for the physical protection of safeguards and security interests. Copies of Section B, Safeguards and Security Alarm Management System, which contains Unclassified Controlled Nuclear Information, and Appendix 1, Security Badge Specifications, which contains Official Use Only information, are only available, by request, from the program manager, Protection Program Operations, 301-903-6209. Chg 1, dated 3/7/06. Cancels: DOE M 473.1-1 and DOE M 471.2-1B

  4. Physical Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes requirements for the physical protection of safeguards and security interests. Copies of Section B, Safeguards and Security Alarm Management System, which contains Unclassified Controlled Nuclear Information, and Appendix 1, Security Badge Specifications, which contains Official Use Only information, are only available, by request, from the program manager, Protection Program Operations, 301-903-6209. Cancels: DOE M 473.1-1 and DOE M 471.2-1B.

  5. Headquarters Facilities Master Security Plan - Chapter 1, Physical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and control of dangerous devices, issuance of security badges to HQ employees, protection of government and personal property, and operation of the HQ lock and key control program. ...

  6. Physical Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-07-23

    This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys (DOEs) purview ranging from facilities, buildings, Government property, and employees to national security interests such as classified information, special nuclear material (SNM), and nuclear weapons. Cancels Section A of DOE M 470.4-2 Chg 1. Canceled by DOE O 473.3.

  7. Physical protection

    SciTech Connect (OSTI)

    Myre, W.C.; DeMontmollin, J.M. )

    1989-07-01

    Serious concern about physical protection of nuclear facilities began around 1972. R and D was initiated at Sandia National Laboratories which had developed techniques to protect weapons for many years. Special vehicles, convoy procedures, and a communications system previously developed for weapons shipments were improved and extended for shipments of other sensitive materials. Barriers, perimeter alarms, portal and internal control systems were developed, tested, and published in handbooks and presented at symposia. Training programs were initiated for U.S. and foreign personnel. Containment and surveillance techniques were developed for the IAEA. Presently emphasis is on computer security, active barriers, and techniques to prevent theft or sabotage by insiders .

  8. Physical Protection Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-12-23

    Supplements DOE O 473.1, by establishing requirements for the physical protection of safeguards and security interests. Cancels: DOE M 5632.1C-1

  9. Office of Headquarters Security Operations

    Broader source: Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

  10. Headquarters Security Operations

    Broader source: Energy.gov [DOE]

    DOE strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; manages access authorization functions; ensures that executives and dignitaries are fully protected, and supports efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

  11. Physical Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-12-23

    Establishes Department of Energy management objectives, requirements and responsibilities for the physical protection of safeguards and security interests. Cancels DOE 5632.1C. Canceled by DOE O 470.4.

  12. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter ...

  13. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter...

  14. Headquarters Facilities Master Security Plan- Chapter 13, Controlled Unclassified Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 13, Controlled Unclassified Information Describes DOE Headquarters procedures for protecting Controlled Unclassified Information (CUI).

  15. Headquarters Accommodation Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs » Headquarters Accommodation Program Headquarters Accommodation Program The Headquarters Accommodation Program Manager works with DOE managers, employees and visitors to provide information and assistance related to persons with disabilities. Areas of assistance include: Auxiliary services, such as sign language interpreting services, readers for the blind, or personal assistants for the physically challenged Guidance and information regarding accommodations, as well as laws and

  16. Physical Protection of Classified Matter

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-03

    The order establishes policy and objectives for physical protection of classified matter. This directive does not cancel another directive. Chg 1, 7-30-93. Canceled by 5632.1C.

  17. Physical Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  18. Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection and Control | Department of Energy Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control 2016 Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control This, the largest chapter in the HQFMSP, describes the procedures required to properly protect classified matter from the day it is created to the

  19. Headquarters Facilities Master Security Plan - Chapter 17, Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Officer Program | Department of Energy 7, Headquarters Security Officer Program Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program 2016 Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program This chapter implements HQ Order 472.1, Headquarters Security Officer Program, which requires that all HQ program elements appoint a Federal employee to the position of HSO and a second Federal employee to

  20. Headquarters Personal Property Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-10-25

    To establish procedures for managing Government personal property owned or leased by the Department of Energy and in the custody of DOE Headquarters employees, including those in the National Nuclear Security Administration. Cancels DOE HQ O 580.1A

  1. Headquarters Security Quick Reference Book

    Office of Energy Efficiency and Renewable Energy (EERE)

    This quick reference book provides an overview of Department of Energy (DOE) Headquarters (HQ) security programs.

  2. Status of target physics for inertial confinement fusion: Report on the review at DOE Headquarters, Germantown, MD on November 14--17, 1988

    SciTech Connect (OSTI)

    Not Available

    1990-03-09

    A four day review to assess the status of target physics of inertial confinement fusion was held at US Department of Energy (DOE) Headquarters on November 14--17, 1988. This review completes the current series of reviews of the inertial fusion program elements to assess the status of the data base for a decision to proceed with the proposed Laboratory Microfusion Facility (LMF) that is being planned. In addition to target physics, the program elements that have been reviewed previously include the driver technology development for KrF and solid-state lasers, and the light-on beam pulsed power system. This series of reviews was undertaken for internal DOE assessment in anticipation of the ICF program review mandated by the Congress in 1988 to be completed in 1990 to assess the significance and implications of the progress that has been realized in the laboratory and the underground Halite/Centurion experiments. For this target physics review, both the direct and the indirect drive approaches were considered. The principal issues addressed in this review were: Is the present target physics data base adequate for a decision to proceed with design and construction of LMF now as opposed to continue planning activities at this time What specific additional target physics data are desirable to reduce the risk for a DOE decision to construct an LMF What is the role for continuation of Halite/Centurion experiments What priority should be given to the direct drive approach Are the program elements optimally structured to resolve the critical issues for an LMF decision Specific findings relating to these five issues are summarized in the following.

  3. DOE Headquarters Receives Energy Star Recognition from EPA | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Receives Energy Star Recognition from EPA DOE Headquarters Receives Energy Star Recognition from EPA July 9, 2008 - 2:15pm Addthis WASHINGTON - U.S. Secretary of Energy Samuel W. Bodman today accepted a plaque from the U.S. Environmental Protection Agency (EPA) certifying the Department of Energy's (DOE) James Forrestal Headquarters Building as an ENERGY STAR® building. The Forrestal building uses 40 percent less energy than the average office building, saving taxpayers

  4. GREENING DOE HEADQUARTERS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GREENING DOE HEADQUARTERS GREENING DOE HEADQUARTERS PDF icon GREENING DOE HEADQUARTERS ... Litigation of Direct Interest to DOE" The Fuel Cell Industrial Vehicle Jobs Act (H.R. 1659

  5. Product Service Codes @ Headquarters | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Codes @ Headquarters A listing of Product Service Codes used at Headquarters Procurement Services PDF icon Produce Service Codes @ Headquarters.pdf More Documents &...

  6. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  7. Office of Headquarters Procurement Services - Employee Customer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS ...

  8. EM Headquarters Office Ensures Safeguards, Security, Emergency Preparedness

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Headquarters Office Ensures Safeguards, Security, Emergency Preparedness EM Headquarters Office Ensures Safeguards, Security, Emergency Preparedness January 14, 2016 - 12:35pm Addthis A Centerra Protective Force employee uses a mirror to check the undercarriage of a transport trailer before it enters a Savannah River Site Limited Area. A Centerra Protective Force employee uses a mirror to check the undercarriage of a transport trailer before it enters a Savannah River

  9. NAICS Codes @ Headquarters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAICS Codes @ Headquarters NAICS Codes @ Headquarters A listing of NAICS codes used at Headquarters Procurement Services NAICS Codes @ Headquarters.pdf (37.93 KB) More Documents & Publications Product Service Codes @ Headquarters Management & Operating Subcontract Reporting Capability (MOSRC) Downloads Historical Procurement Information

  10. Headquarters Facilities Master Security Plan - Chapter 17, Headquarter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This chapter implements HQ Order 472.1, Headquarters Security Officer Program, which requires that all HQ program elements appoint a Federal employee to the position of HSO and a ...

  11. Office of Headquarters Personnel Security Operations

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Headquarters Personnel Security manages and implements safeguards and security access authorization functions for DOE Headquarters and manages the Personal Identity Verification (PIV) process for Headquarters as mandated by Homeland Security Presidential Directive Number 12 (HSPD-12).

  12. Headquarters Facilities Master Security Plan- Acronyms

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Acronyms A list of the acronyms contained in the 2016 Headquarters Facilities Master Security Plan (HQFMSP).

  13. Applications of fiber optics in physical protection

    SciTech Connect (OSTI)

    Buckle, T.H.

    1994-03-01

    The purpose of this NUREG is to provide technical information useful for the development of fiber-optic communications and intrusion detection subsystems relevant to physical protection. There are major sections on fiber-optic technology and applications. Other topics include fiber-optic system components and systems engineering. This document also contains a glossary, a list of standards and specifications, and a list of fiber-optic equipment vendors.

  14. Headquarters Personal Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-09-26

    To establish procedures for managing Government personal property owned or leased by the Department of Energy and in the custody of DOE Headquarters employees, including those in the National Nuclear Security Administration. Cancels DOE HQ O 580.1B. Canceled by DOE N 251.69.

  15. Selected DOE headquarters publications, October 1979

    SciTech Connect (OSTI)

    1981-03-01

    A cumulative listing of DOE headquarters publications issued since October 1979 is provided along with an index of title keywords. Three types of headquarters publications have been included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations; reports prepared by contractors (and published by DOE headquarters) to describe research and development work they have performed for the department; and environmental development plans, environmental impact statements, and environmental readiness documents. Availabilities of documents are given. (GHT)

  16. Headquarters Facilities Master Security Plan - Chapter 12, Special...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern Headquarters Facilities Master Security Plan - Acronyms ...

  17. Headquarters Facilities Master Security Plan- Chapter 9, Technical Surveillance Countermeasures

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures Describes the DOE Headquarters Technical Security Countermeasures (TSCM) Program.

  18. Headquarters Facilities Master Security Plan- Chapter 10, Security Awareness Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program Describes the DOE Headquarters Security Awareness Program

  19. Headquarters Facilities Master Security Plan - Chapter 9, Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9, Technical Surveillance Countermeasures Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures 2016 Headquarters Facilities Master ...

  20. Headquarters Facilities Master Security Plan - Chapter 8, Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures Headquarters Facilities Master Security Plan - Chapter 15, ...

  1. Proliferation Resistance and Physical Protection Evaluation Methodology Development and Applications

    SciTech Connect (OSTI)

    Bari,R.A.; Bari, R.; Peterson, P.; Therios, I.; Whitlock, J.

    2009-07-08

    An overview of the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection of Generation IV nuclear energy Systems.

  2. Headquarters Occupational Health Clinics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Occupational Health Clinics Headquarters Occupational Health Clinics The Department of Energy recognizes the importance of maintaining a healthy and fit Federal workforce. To that end, our occupational health care professionals at the Headquarters Occupational Health Clinics in Forrestal and Germantown provide the following services: Walk-in care. Assessment, nursing care and follow-up for minor illnesses and injuries on a walk-in basis. First-response. Emergency treatment to any

  3. EM Headquarters Completes Reorganization | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Completes Reorganization EM Headquarters Completes Reorganization July 28, 2016 - 1:25pm Addthis WASHINGTON, D.C. - EM headquarters is moving forward with a new organizational structure intended to further improve EM's ability to effectively and efficiently conduct cleanup activities across the DOE complex. The new structure, finalized in late July, is expected to address inefficiencies such as duplicative processes; disproportionate senior leadership reporting ratios; and a

  4. Independent Oversight Review, DOE Headquarters Facilities - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of ...

  5. DOE Headquarters Contact Information: Employee Concerns Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee Concerns Program http:energy.govdiversity 1 DOE Headquarters Contact Information: Employee Concerns Program Patricia Zarate Phone: 202-586-2248 Fax: 202-586-3075 ...

  6. Headquarters Separation Clearance Process | Department of Energy

    Office of Environmental Management (EM)

    Separation Clearance Process Headquarters Separation Clearance Process When a DOE employee leaves the agency, either by resignation, transfer to another agency, termination or ...

  7. Fundamentals of health physics for the radiation-protection officer

    SciTech Connect (OSTI)

    Murphy, B.L.; Traub, R.J.; Gilchrist, R.L.; Mann, J.C.; Munson, L.H.; Carbaugh, E.H.; Baer, J.L.

    1983-03-01

    The contents of this book on health physics include chapters on properties of radioactive materials, radiation instrumentation, radiation protection programs, radiation survey programs, internal exposure, external exposure, decontamination, selection and design of radiation facilities, transportation of radioactive materials, radioactive waste management, radiation accidents and emergency preparedness, training, record keeping, quality assurance, and appraisal of radiation protection programs. (ACR)

  8. Selected DOE headquarters publications, October 1979

    SciTech Connect (OSTI)

    1981-01-01

    The publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. Publications issued during October 1977 to September 1979 are covered in DOE/AD-0010/6. Publications from 26 headquarters offices are presented and consist of three types: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations; reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department under 01-type contracts; and environmental development plans, impact statements, and readiness documents. Availability of the documents is described.

  9. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program (1.88 MB) More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  10. Headquarters Facilities Master Security Plan- Chapter 16, Equivalencies and Exemptions

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions Describes DOE Headquarters procedures for requesting Equivalencies and Exemptions to DOE security directives.

  11. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June 2015 2015 Headquarters Facilities Master Security Plan...

  12. Headquarters Facilities Master Security Plan- Chapter 6, Foreign Interaction

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 6, Foreign Interaction Describes DOE Headquarters procedures for approving foreign national visitors and assignees and travel to foreign countries.

  13. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June...

  14. Headquarters Facilities Master Security Plan- Chapter 12, Special Access Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.

  15. Headquarters Facilities Master Security Plan- Chapter 7, Surveys and Reviews

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews Describes DOE Headquarters procedures for conducting various types of security reviews and assessments and correcting findings.

  16. Headquarters Facilities Master Security Plan- Chapter 3, Personnel Security

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 3, Personnel Security Describes DOE Headquarters Personnel Security procedures for acquiring, maintaining, and passing security clearances.

  17. Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71.1 Headquarters Business Clearance Process Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process There was mention in the National Academy of Public ...

  18. Headquarters Facilities Master Security Plan- Table of Contents

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Table of Contents Table of Contents for the 2016 Headquarters Facilities Master Security Plan (HQFMSP).

  19. Headquarters Facilities Master Security Plan- Chapter 15, Outprocessing

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing Describes DOE Headquarters procedures for completing required security actions by departing employees and contractors.

  20. Headquarters Facilities Master Security Plan - Chapter 14, Cyber...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, Cyber Security Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber ...

  1. Headquarters Facilities Master Security Plan - Chapter 7, Surveys...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7, Surveys and Reviews Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews 2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and ...

  2. Headquarters Facilities Master Security Plan - Chapter 15, Outprocessi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5, Outprocessing Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing 2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing This chapter ...

  3. Volvo Truck Headquarters in North Carolina to Host Event With...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volvo Truck Headquarters in North Carolina to Host Event With Acting Under Secretary of Energy Majumdar Volvo Truck Headquarters in North Carolina to Host Event With Acting Under ...

  4. Selected DOE Headquarters publications, October 1979

    SciTech Connect (OSTI)

    1980-07-01

    This publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. Three types of headquarters publications are included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations, reports prepared by contractors to describe research and development work they have performed for the Department, and environmental development plans and impact statements. Such items as pamphlets, fact sheets, bulletins, newsletters, telephone directories, headquarters publications issued under the DOE-tr and CONF codes, technical reports from the Jet Propulsion Laboratory and NASA issued under DOE/JPL and DOE/NASA codes, and weekly/monthly reports of the Energy Information Administration are not included. (RWR)

  5. Selected DOE Headquarters Publications, October 1979

    SciTech Connect (OSTI)

    1980-09-01

    This publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. (Publications issued during October 1977-September 1979 are covered in DOE/AD-0010/6.) Three types of headquarters publications are included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations, reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department, and environmental development plans and impact statements. Certain publications have been omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, and telephone directories, headquarters publications issued under the DOE-tr and CONF codes, technical reports from the Jet Propulsion Laboratory and NASA issued under DOE/JPL and DOE/NASA codes, and weekly/monthly reports of the Energy Information Administration. (RWR)

  6. NNSA Headquarters | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Headquarters locations 1000 Independence Ave., S.W. Washington, DC 20585 Routing SymbolGermantown Building 1000 Independence Ave., S.W. Washington, DC 20585 View Larger Map P.O ...

  7. EM Headquarters Office Ensures Safeguards, Security, Emergency...

    Energy Savers [EERE]

    Its role assisting, assessing, and advocating for EM field sites is similar to the functions of the rest of EM headquarters. But the office differs with its focus on ensuring EM's ...

  8. Selected DOE Headquarters publications, October 1979-

    SciTech Connect (OSTI)

    1980-11-01

    This publication provides a cumulative listing of and an index to DOE headquarters publications issued since October 1979. (Publications issued during October 1977 to September 1979 are covered in DOE/AD-0010/6.) Three types of headquarters publications are included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations, reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department, and environmental development plans, environmental impact statements, and environmental readiness documents. Certain publications have been omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, and telephone directories. Also omitted are weekly/monthly reports of the Energy Information Administration and headquarters publications issued under the DOE-tr and CONF codes. (RWR)

  9. Corrective Action Plan for Environmenta' Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan for Environmenta' Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14~ 2014 Washington, DC 20585 August 2015 Corrective Action Plan for Environmental Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Deputy Assistant Secretary for Safety, Security, and Quality Programs Environmental Management Approved by: Monica Regalbuto Assistant Secretary for

  10. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  11. DOE & Headquarters Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Headquarters Awards DOE & Headquarters Awards Departmental Awards November 13, 2014 Facility Representative of the Year Award The Facility Representative Award Program is a special award designed to recognize superior or exemplary service by a Facility Representative over a period of one year. This special award program has been established in accordance with the requirements of Department of Energy (DOE) Order 331.1C, Employee Performance Management and Recognition Program. November

  12. Physical protection system using activated barriers

    SciTech Connect (OSTI)

    Timm, R.E.; Zinneman, T.E.; Haumann, J.R.; Flaugher, H.A.; Reigle, D.L.

    1984-03-01

    The Argonne National Laboratory has recently installed an activated barrier, the Access Denial System, to upgrade its security. The technology of this system was developed in the late 70's by Sandia National Laboratory-Albuquerque. The Argonne National Laboratory is the first Department of Energy facility to use this device. Recent advancements in electronic components provide the total system support that makes the use of an activated barrier viable and desirable. The premise of an activated barrier is that it is deployed after a positive detection of an adversary is made and before the adversary can penetrate vital area. To accomplish this detection, sophisticated alarms, assessment, and communications must be integrated into a system that permits a security inspector to make a positive evaluation and to activate the barrier. The alarm sensor locations are selected to provide protection in depth. Closed circuit television is used with components that permit multiple video frames to be stored for automated, priority-based playback to the security inspector. Further, algorithms permit look-ahead surveillance of vital areas so that the security inspector can activate the access denial system in a timely manner and not be restricted to following the adversaries' penetration path(s).

  13. Headquarters Facilities Master Security Plan- Chapter 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas Describes DOE Headquarters procedures for establishing, maintaining, and deactivating Limited Areas and Vault-Type Rooms and protecting the classified information handled within those Areas.

  14. Selected DOE headquarters publications, October 1979

    SciTech Connect (OSTI)

    1980-05-01

    This publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. (Publications issued during October 1977-September 1979 are covered in DOE/AD-0010/6). Three types of headquarters publications are included: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations, reports prepared by contractors to describe research and development work they have performed for the Department, and environmental development plans and impact statements. Certain publications are omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, telephone directories, publications issued under the DOE-tr and CONF codes, technical reports from the Jet Propulsion Laboratory and NASA issued under DOE/JPL and DOE/NASA codes, and weekly/monthly reports of the Energy Information Administration. (RWR)

  15. 31 Tannery Road- Ferreira Construction Headquarters

    High Performance Buildings Database

    Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

  16. NAICS Codes @ Headquarters Description: NAICS Codes used at Headquarters Procurement Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAICS Codes @ Headquarters Description: NAICS Codes used at Headquarters Procurement Services Filters: Signed Date only show values between , Contracting Agency ID show only ('8900'), Contracting Office ID show only ('00001'), Date Signed only show values between '05/01/2011' and '04/30/2012', Last Modified Date only show values between Contracting Agency ID: 8900, Contracting Office ID: 00001 NAICS Code NAICS Description Action Obligation 541519 OTHER COMPUTER RELATED SERVICES 341

  17. Physical protection technologies for the reconfigured weapons complex

    SciTech Connect (OSTI)

    Jaeger, C.D.

    1994-08-01

    Sandia National Laboratories was a memtier of the Weapons Complex Reconfiguration (WCR) Safeguards and Security (S&S) team providing assistance to the Department of Energy`s (DOE) Office of Weapons Complex Reconfigaration. New and improved S&S concepts, approaches and technologies were needed to support both new and upgraded facilities. Physical protection technologies used in these facilities were to use proven state-of-the-art systems in such areas as image processing, alarm communications and display, entry control, contraband detection, intrusion detection and video assessment, access delay, automation and robotics, and various insider protection systems. Factors considered in the selection of these technologies were protection against the design basis threat, reducing S&S life-cycle costs, automation of S&S functions to minimize operational costs, access to critical assets and exposure of people to hazardous environments, increasing the amount of delay to an outsider adversary and having reliable and maintainable systems. This paper will discuss the S&S issues, requirements, technology opportunities and needs. Physical protection technologies and systems considered in the design effort of the Weapons Complex Reconfiguration facilities will be reviewed.

  18. Office of Headquarters Procurement Services - Employee Customer Service

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards | Department of Energy Office of Headquarters Procurement Services - Employee Customer Service Standards Office of Headquarters Procurement Services - Employee Customer Service Standards CUSTOMER FOCUS The Office of Headquarters Procurement Services (MA-64) serves a variety of customers in the performance of its acquisition and financial assistance mission. Primary among its many customers is each of the Department of Energy Headquarters program offices. MA-64 continually seeks to

  19. Acquisition Guide Chapter 71.1- Headquarters Business Clearance Process

    Broader source: Energy.gov [DOE]

    Revised Acquisition Guide Chapter 71.1, "Headquarters Business Clearance Process" Issued as Policy Flash 2008-66

  20. CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 December 4, 2007 Feedback and Continuous Improvement Inspection Criteria and Approach - DOE Headquarters (HSS CRAD 64-22) The Department of Energy (DOE) Headquarters line management has established and implemented effective oversight processes that evaluate the adequacy and effectiveness of field element

  1. Headquarters Facilities Master Security Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Headquarters Facilities Master Security Plan Headquarters Facilities Master Security Plan Welcome to the 2016 version of the Headquarters Facilities Master Security Plan (HQFMSP). The purpose of the HQFMSP is to inform employees, contractors, and visitors of the security procedures in place at Department of Energy (DOE) Headquarters (HQ) facilities in the Washington, DC area. The HQFMSP does not establish new security requirements; security requirements are established by various Federal laws

  2. Headquarters Occupational Safety and Health Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-11-03

    To implement the Occupational Safety and Health Program for Department of Energy (DOE) Headquarters employees as an element of the DOE Integrated Safety Management System. Cancels: HQ 3790.2A. Canceled by DOE O 251.91. This directive was reviewed and certified as current and necessary by Bruce M. Carnes, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 9/18/02. Canceled by DOE N 251.91.

  3. International physical protection self-assessment tool for chemical facilities.

    SciTech Connect (OSTI)

    Tewell, Craig R.; Burdick, Brent A.; Stiles, Linda L.; Lindgren, Eric Richard

    2010-09-01

    This report is the final report for Laboratory Directed Research and Development (LDRD) Project No.130746, International Physical Protection Self-Assessment Tool for Chemical Facilities. The goal of the project was to develop an exportable, low-cost, computer-based risk assessment tool for small to medium size chemical facilities. The tool would assist facilities in improving their physical protection posture, while protecting their proprietary information. In FY2009, the project team proposed a comprehensive evaluation of safety and security regulations in the target geographical area, Southeast Asia. This approach was later modified and the team worked instead on developing a methodology for identifying potential targets at chemical facilities. Milestones proposed for FY2010 included characterizing the international/regional regulatory framework, finalizing the target identification and consequence analysis methodology, and developing, reviewing, and piloting the software tool. The project team accomplished the initial goal of developing potential target categories for chemical facilities; however, the additional milestones proposed for FY2010 were not pursued and the LDRD funding therefore was redirected.

  4. PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION WORKING GROUP: METHODOLOGY AND APPLICATIONS

    SciTech Connect (OSTI)

    Bari R. A.; Whitlock, J.; Therios, I.U.; Peterson, P.F.

    2012-11-14

    We summarize the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection (PR and PP) of Generation IV nuclear energy systems. We intend the results of the evaluations performed with the methodology for three types of users: system designers, program policy makers, and external stakeholders. The PR and PP Working Group developed the methodology through a series of demonstration and case studies. Over the past few years various national and international groups have applied the methodology to nuclear energy system designs as well as to developing approaches to advanced safeguards.

  5. HEADQUARTERS, U.S. DEPARTMENT OF ENERGY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HEADQUARTERS, U.S. DEPARTMENT OF ENERGY HQ F 3335.1 (3-85) REQUEST FOR MERIT PROMOTION CONSIDERATION (To be filed by applicant and attached to SF-171) Instructions to Applicants: Complete Items 1 through 6 below and submit together with all other required materials to the address listed on the vacancy announcement. Title of Position Applied for 3. Grade 4. Announcement No. 2. Date Submitted 1. 5. Name 6. Address (Please type, or print clearly with ball point pen) REPORT ON CONSIDERATION (to be

  6. Headquarters Employment Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employment Verification Headquarters Employment Verification M&P Employees should contact Marilyn Samuels at 202-586-8571 for basic employment verification. S&E Employees should contact the Benefits Branch for basic employment verification. Requests should be faxed to 865-576-5050. If a fax is not available, please email requests to SESSCBenefits@hc.doe.gov This is for "is this person employed here?", or "how long has this person been employed?". There will be no

  7. COLLECTIVE BARGAINING AGREEMENT BETWEEN Department of Energy Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COLLECTIVE BARGAINING AGREEMENT BETWEEN Department of Energy Headquarters and the PREAMBLE This collective bargaining agreement is entered into to prescribe certain rights and obligations of the employees of the Department of Energy (DOE) Headquarters represented by the National Treasury Employees Union (NTEU) and to delineate procedures which are designed to meet the special requirements and needs of DOE Headquarters. The provisions of this agreement have been negotiated and should be

  8. Energy Department Completes Cool Roof Installation on DC Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  9. Headquarters Program & Staff Office Mailing Addresses | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Program & Staff Office Mailing Addresses Headquarters Program & Staff Office Mailing Addresses The following addresses are for delivery of regular mail and small packages: Delivery to the Headquarters buildings in Washington, DC: Name of Individual Title Routing Symbol/Forrestal Building U.S. Department of Energy 1000 Independence Ave., S.W. Washington, DC 20585 Name of Individual Title Routing Symbol/L'Enfant Plaza Building U.S. Department of Energy 1000

  10. Wind Turbine Showcased in Energy Department Headquarters | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Turbine Showcased in Energy Department Headquarters Wind Turbine Showcased in Energy Department Headquarters February 26, 2016 - 9:23am Addthis A Pika Energy wind turbine is the newest addition to the Department of Energy's headquarters lobby in Washington, D.C. | Photo by Mike Mueller, The Hannon Group A Pika Energy wind turbine is the newest addition to the Department of Energy's headquarters lobby in Washington, D.C. | Photo by Mike Mueller, The Hannon Group Unlike utility-scale

  11. Search and Access Control Procedures for Headquarters Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-18

    To notify all Headquarters employees of routine security procedure to be followed in the Department of Energy (DOE) Headquarters buildings. This page change notifies employees that they should expect to have their badges touched by security inspector when entering the building. This directive does not cancel another directive. Page change, 8-11-89. Canceled by DOE N 251.11.

  12. Fire Protection Support Engineer | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fire Protection Support Engineer Department: Engineering Supervisor(s): Scott Decker Staff: AM 03 Requisition Number: 1600200 Position Summary: Assists project engineer with any ...

  13. 1993 Radiation Protection Workshop: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    The 1993 DOE Radiation Protection Workshop was conducted from April 13 through 15, 1993 in Las Vegas, Nevada. Over 400 Department of Energy Headquarters and Field personnel and contractors from the DOE radiological protection community attended the Workshop. Forty-nine papers were presented in eleven separate sessions: Radiological Control Manual Implementation, New Approaches to Instrumentation and Calibration, Radiological Training Programs and Initiatives, External Dosimetry, Internal Dosimetry, Radiation Exposure Reporting and Recordkeeping, Air Sampling and Monitoring Issues, Decontamination and Decommissioning of Sites, Contamination Monitoring and Control, ALARA/Radiological Engineering, and Current and Future Health Physics Research. Individual papers are indexed separately on the database.

  14. Headquarters Facilities Master Security Plan- Chapter 11, Incidents of Security Concern

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.

  15. Headquarters Security Operations Foreign Ownership Control or Influence Program

    Broader source: Energy.gov [DOE]

    The Headquarters Foreign Ownership Control or Influence (FOCI) Program is established by DOE Order to evaluate the foreign involvement of a company being considered for award of a contract that...

  16. DOE Headquarters Review Focuses on Improved LATA Kentucky Worker Safety

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – DOE Office of Health, Safety and Security headquarters representatives recently spent three days at the Paducah site helping EM cleanup contractor LATA Kentucky better identify and correct issues before they result in worker illness or injury.

  17. Secretary Chu Visits ENN Headquarters and Tianjin University...

    Energy Savers [EERE]

    Secretary Chu Visits ENN Headquarters and Tianjin University July 17, 2009 - 12:00am Addthis TIANJIN, CHINA - On the final day of his trip to China with Commerce Secretary Gary ...

  18. Headquarters Security Operations Facility Clearance and Approval Program

    Broader source: Energy.gov [DOE]

    The Headquarters Facility Clearance and Approval Program (FCAP) is established by DOE Order to administratively determine that a facility is or is not eligible to access, receive, produce, use, and...

  19. DOE Headquarters FOIA Request Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Management » Freedom of Information Act » DOE Headquarters FOIA Request Form DOE Headquarters FOIA Request Form To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form. Contact information Name * Organization Address * Fax number Phone number Email

  20. Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4, Cyber Security Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber security activities are managed by the Cyber Support Division (IM-622) within the Office of Chief Information Officer (IM-1). This chapter only covers the requirement for each HQ program element to appoint an Information Systems Security Officer (ISSO) to act as the point of contact between the

  1. Headquarters Facilities Master Security Plan - Chapter 8, Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Program | Department of Energy 8, Operations Security Program Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program 2016 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program This chapter describes the HQ OPSEC Program and the procedures to be followed by HQ program elements for identifying their Critical Information. This chapter also discusses the appointment of OPSEC representatives, activities of the HQ OPSEC

  2. Geothermal Retrofit of Illinois National Guard State Headquarters Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Retrofit of Illinois National Guard State Headquarters Building Geothermal Retrofit of Illinois National Guard State Headquarters Building Develop methodology for determining mine water quality and quantity; Determine legal issues related to ownership, liability and permitting requirements; Determine the best energy recovery systems that balance cost with environmental or other concerns. gshp_lee_illinois_national_guard.pdf (549.37 KB) More Documents & Publications

  3. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  4. Fire Protection Related Sites | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Web Sites EFCOG - Fire Protection Working Group Headquarter's Office of Science Brookhaven National Laboratory Hanford Fire Department Non-DOE Government-Related Web Sites Consumer ...

  5. International Training Course on Physical Protection (ITC-25) Report.

    SciTech Connect (OSTI)

    Overholt, Michelle Jungst

    2015-06-01

    The goal of this evaluation repor t is to provide the informa tion necessary to improve the effectiveness of the ITC provided to the In ternational Atomic Energy Agency Member States. This report examines ITC-25 training content, delivery me thods, scheduling, and logistics. Ultimately, this report evaluates whether the course pr ovides the knowledge and skills necessary to meet the students' needs in the protection of nuclear materials and facilities.

  6. Paducah Wall Display Unveiled at DOE Headquarters | Department of Energy

    Energy Savers [EERE]

    Wall Display Unveiled at DOE Headquarters Paducah Wall Display Unveiled at DOE Headquarters September 11, 2015 - 3:48pm Addthis Federal, state and local Kentucky officials joined Secretary of Energy Dr. Ernest Moniz (third from left) and Senate Majority Mitch McConnell on September 10, 2015 as they cut the ribbon introducing the new Paducah Site wall display on the Fifth Floor of DOE’s Forrestal Building in Washington, D.C. Pictured (left-right) are: U.S. Rep. Ed Whitfield, Sen. McConnell,

  7. Review of the Headquarters Facilities Emergency Response Plans

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight and Performance Assurance Office of the Secretary of Energy March 2002 Review of the Headquarters Facilities Emergency Response Plans OVERSIGHT Table of Contents 1.0 INTRODUCTION ...................................................................... 1 2.0 OVERVIEW OF RESULTS ........................................................ 3 3.0 DISCUSSION OF RESULTS ...................................................... 5 3.1 Emergency Response Programs, Plans, and Procedures

  8. Headquarters Facilities Master Security Plan- Chapter 4, FOCI, Facility Clearances, and Classified Contract Registration

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 4, FOCI, Facility Clearances, and Classified Contract Registration Describes DOE Headquarters procedures for contractors making FOCI submissions, obtaining facility clearances, and registering classified contracts.

  9. AEC Headquarters | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    AEC Headquarters Basic Energy Sciences (BES) BES Home About Organization Chart .pdf file (132KB) Staff BES Budget BES Committees of Visitors Directions Jobs Organizational History Germantown Natural History President Kennedy's AEC Briefings Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) Community Resources Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence

  10. FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008, FOIA_Requests_received_by_DOE_Headquarter_as_of_8-7-09.pdf FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 (243.39 KB) More Documents & Publications Chief Freedom of Information Act (FOIA) Officer Report for FY2009 Special Report:

  11. Topics in radiation at accelerators: Radiation physics for personnel and environmental protection

    SciTech Connect (OSTI)

    Cossairt, J.D.

    1996-10-01

    In the first chapter, terminology, physical and radiological quantities, and units of measurement used to describe the properties of accelerator radiation fields are reviewed. The general considerations of primary radiation fields pertinent to accelerators are discussed. The primary radiation fields produced by electron beams are described qualitatively and quantitatively. In the same manner the primary radiation fields produced by proton and ion beams are described. Subsequent chapters describe: shielding of electrons and photons at accelerators; shielding of proton and ion accelerators; low energy prompt radiation phenomena; induced radioactivity at accelerators; topics in radiation protection instrumentation at accelerators; and accelerator radiation protection program elements.

  12. English/Russian and Russian/English glossary of physical protection terms

    SciTech Connect (OSTI)

    Soo Hoo, M.S.

    1995-07-01

    This glossary was prepared in fulfillment of the Glossary Preparation Task identified in the Program Plan for providing Assistance to the Russian Federation in Nuclear Material Control and Accounting and Physical Protection. The Program Plan is part of the Cooperative Threat Reduction Program as provided for under House Resolution (H.R.) 3807 (Title II, as referenced under Public Law (P.L.) 102-229. The terms in this glossary were derived from physical protection training material prepared at Sandia. The training material, and thus refinements to the glossary, has undergone years of development in presentation to both domestic and international audiences. Also, Russian Colleagues and interpreters have reviewed the translations for accuracy.

  13. Summary of Technical Meeting To Compare US/French Approaches for Physical Protection Test Beds

    SciTech Connect (OSTI)

    Mack, Thomas Kimball; Martinez, Ruben; Thomas, Gerald; Palut, Jean-Michel

    2016-01-01

    In September 2015, representatives of the US Department of Energy/National Nuclear Security Administration, including test bed professionals from Sandia National Laboratories, and representatives of the French Alternative Energies and Atomic Energy Commission participated in a one-week workshop to share best practices in design, organization, operations, utilization, improvement, and performance testing of physical protection test beds. The intended workshop outcomes were to (1) share methods of improving respective test bed methodologies and programs and (2) prepare recommendations for standards regarding creating and operating testing facilities for nations new to nuclear operations. At the workshop, the French and American subject matter experts compared best practices as developed at their respective test bed sites; discussed access delay test bed considerations; and presented the limitations/ constraints of physical protection test beds.

  14. An overview of the global threat reduction initiative's physical protection work in Tanzania.

    SciTech Connect (OSTI)

    Banzi, Firmi Paul; Itamura, Michael Takeshi; Robinson, Phillip W.; Strosinski, Micheal Vernon

    2010-06-01

    The U.S. Department of Energy's (DOE) National Nuclear Security Administration (NNSA) established the Global Threat Reduction Initiative's (GTRI) mission to reduce and protect nuclear and radiological materials located at civilian sites worldwide. Internationally, over 80 countries are cooperating with GTRI to enhance security of facilities with these materials. In 2004, a GTRI delegation began working with the Tanzania Atomic Energy Commission, (TAEC). The team conducted site assessments for the physical protection of radiological materials in Tanzania. Today, GTRI and the Government of Tanzania continue cooperative efforts to enhance physical security at several radiological sites, including a central sealed-source storage facility, and sites in the cities of Arusha, Dar Es Salaam, and Tanga. This paper describes the scope of physical protection work, lessons learned, and plans for future cooperation between the GTRI program and the TAEC. Additionally the paper will review the cooperative efforts between TAEC and the International Atomic Energy Agency (IAEA) with regards to a remote monitoring system at a storage facility and to the repackaging of radioactive sources.

  15. Volvo Truck Headquarters in North Carolina to Host Event With Acting Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Secretary of Energy Majumdar | Department of Energy Volvo Truck Headquarters in North Carolina to Host Event With Acting Under Secretary of Energy Majumdar Volvo Truck Headquarters in North Carolina to Host Event With Acting Under Secretary of Energy Majumdar January 26, 2012 - 2:00pm Addthis Washington, D.C. - Tomorrow, Friday, January 27, Acting Under Secretary of Energy Arun Majumdar and North Carolina Congressman Howard Coble will visit the Volvo Group's truck headquarters in Greensboro,

  16. GKTC ACTIVITIES TO PROVIDE NUCLEAR MATERIAL PHYSICAL PROTECTION, CONTROL AND ACCOUNTING TRAINING FOR 2011-2012

    SciTech Connect (OSTI)

    Romanova, Olena; Gavrilyuk, Victor I.; Kirischuk, Volodymyr; Gavrilyuk-Burakova, Anna; Diakov, Oleksii; Drapey, Sergiy; Proskurin, Dmitry; Dickman, Deborah A.; Ferguson, Ken

    2011-10-01

    The GKTC was created at the Kyiv Institute of Nuclear Research as a result of collaborative efforts between the United States and Ukraine. The GKTC has been designated by the Ukrainian Government to provide the MPC&A training and methodological assistance to nuclear facilities and nuclear specialists. In 2010 the GKTC has conducted the planned assessment of training needs of Ukrainian MPC&A specialists. The objective of this work is to acquire the detailed information about the number of MPC&A specialists and guard personnel, who in the coming years should receive the further advanced training. As a result of the performed training needs evaluation the GKTC has determined that in the coming years a number of new training courses need to be developed. Some training courses are already in the process of development. Also taking into account the specific of activity on the guarding of nuclear facilities, GKTC has begun to develop the specialized training courses for the guarding unit personnel. The evaluation of needs of training of Ukrainian specialists on the physical protection shows that without the technical base of learning is not possible to satisfy the needs of Ukrainian facilities, in particular, the need for further training of specialists who maintains physical protection technical means, provides vulnerability assessment and testing of technical means. To increase the training effectiveness and create the basis for specialized training courses holding the GKTC is now working on the construction of an Interior (non-classified) Physical Protection Training Site. The objective of this site is to simulate the actual conditions of the nuclear facility PP system including the complex of engineering and technical means that will help the GKTC training course participants to consolidate the knowledge and gain the practical skills in the work with PP system engineering and technical means for more effective performance of their official duties. This paper briefly

  17. February 5, 2009: Obama visits DoE Headquarters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5, 2009: Obama visits DoE Headquarters February 5, 2009: Obama visits DoE Headquarters February 5, 2009: Obama visits DoE Headquarters February 5, 2009 President Obama visits DOE's headquarters at the Forrestal building and in remarks to DOE employees discusses energy and the need for swift passage of the economic recovery plan. "For the last few years, I've talked about [energy] issues with Americans from one end of this country to another," the President tells his audience. "And

  18. Sections prepared for inclusion in an IAEA technical document handbook on Designing and Implementing a Physical Protection System

    SciTech Connect (OSTI)

    Snell, Mark K.

    2015-11-01

    Two major sections were drafted (each with several subsections) for the IAEA dealing with designing and implementing a Physical Protection System (PPS). Areas addressed were Search Systems and the evaluation of PPS effectiveness.

  19. CHALLENGES IN THE PRELIMINARY RESULTS DISPLAY FROM THE GIF PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION EVALUATION METHODOLOGY

    SciTech Connect (OSTI)

    Gastelum, Zoe N.; Zentner, Michael D.

    2009-10-06

    The Generation IV International Forum (GIF) Nuclear Energy System Proliferation Resistance and Physical Protection Evaluation Methodology has been used in several proliferation resistance nuclear reactor system design case studies to evaluate the differences in proliferation resistance of these systems. These studies, performed by a team of multi-national laboratory proliferation resistance experts, used an expert elicitation pathway assessment tool developed by Pacific Northwest National Laboratory. This paper will discuss a variety of approaches, including graphical approaches, for the display and analysis of preliminary proliferation resistance results and describe the technical difficulties associated with the analysis of the collected data. The paper concludes with recommendations for qualitative methods to display the results from the expert elicitation.

  20. DEVELOPMENT OF A METHODOLOGY TO ASSESS PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION FOR GENERATION IV SYSTEMS

    SciTech Connect (OSTI)

    Nishimura, R.; Bari, R.; Peterson, P.; Roglans-Ribas, J.; Kalenchuk, D.

    2004-10-06

    Enhanced proliferation resistance and physical protection (PR&PP) is one of the technology goals for advanced nuclear concepts, such as Generation IV systems. Under the auspices of the Generation IV International Forum, the Office of Nuclear Energy, Science and Technology of the U.S. DOE, the Office of Nonproliferation Policy of the National Nuclear Security Administration, and participating organizations from six other countries are sponsoring an international working group to develop an evaluation methodology for PR&PP. This methodology will permit an objective PR&PP comparison between alternative nuclear systems (e.g., different reactor types or fuel cycles) and support design optimization to enhance robustness against proliferation, theft and sabotage. The paper summarizes the proposed assessment methodology including the assessment framework, measures used to express the PR&PP characteristics of the system, threat definition, system element and target identification, pathway identification and analysis, and estimation of the measures.

  1. Environmental Management Headquarters Corrective Action Plan- Radiological Release Phase I

    Broader source: Energy.gov [DOE]

    The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31 Conclusions and 47 Judgments of Need (JON). Twelve of the Conclusions and ten of the JONs were determined to be associated with DOE HQ oversight of the operations. As such, EM HQ has taken the action to develop the CAP for those JONs specific to HQ (i.e., JONs 11, 13, 23, 25, 26, 32, 44-47). This report documents those corrective actions, along with the responsible office and due dates for completing the actions. The overall approval process for the CAPs associated with this event will involve both the Carlsbad Field Office (CBFO) and EM HQ offices. Specifically, CBFO will approve the NWP CAP (with EM HQ concurrence); EM HQ Office of Safety, Security, and Quality Programs (EM-40) will approve the CBFO CAP; and the Assistant Secretary for the Office of Environmental Management (EM-1) will approve the EM HQ CAP.

  2. Very High-Temperature Reactor (VHTR) Proliferation Resistance and Physical Protection (PR&PP)

    SciTech Connect (OSTI)

    Moses, David Lewis

    2011-10-01

    This report documents the detailed background information that has been compiled to support the preparation of a much shorter white paper on the design features and fuel cycles of Very High-Temperature Reactors (VHTRs), including the proposed Next-Generation Nuclear Plant (NGNP), to identify the important proliferation resistance and physical protection (PR&PP) aspects of the proposed concepts. The shorter white paper derived from the information in this report was prepared for the Department of Energy Office of Nuclear Science and Technology for the Generation IV International Forum (GIF) VHTR Systems Steering Committee (SSC) as input to the GIF Proliferation Resistance and Physical Protection Working Group (PR&PPWG) (http://www.gen-4.org/Technology/horizontal/proliferation.htm). The short white paper was edited by the GIF VHTR SCC to address their concerns and thus may differ from the information presented in this supporting report. The GIF PR&PPWG will use the derived white paper based on this report along with other white papers on the six alternative Generation IV design concepts (http://www.gen-4.org/Technology/systems/index.htm) to employ an evaluation methodology that can be applied and will evolve from the earliest stages of design. This methodology will guide system designers, program policy makers, and external stakeholders in evaluating the response of each system, to determine each system's resistance to proliferation threats and robustness against sabotage and terrorism threats, and thereby guide future international cooperation on ensuring safeguards in the deployment of the Generation IV systems. The format and content of this report is that specified in a template prepared by the GIF PR&PPWG. Other than the level of detail, the key exception to the specified template format is the addition of Appendix C to document the history and status of coated-particle fuel reprocessing technologies, which fuel reprocessing technologies have yet to be deployed

  3. Development of Physical Protection Regulations for Rosatom State Corporation Sites under the U.S.-Russian MPC&A Program

    SciTech Connect (OSTI)

    Izmaylov, Alexander; Babkin, Vladimir; Shemigon, Nikolai N.; O'Brien, Patricia; Wright, Troy L.; Hazel, Michael J.; Tuttle, John D.; Cunningham, Mitchel E.; Lane, Melinda; Kovchegin, Dmitry

    2012-07-14

    This paper describes issues related to upgrading the physical protection regulatory basis for Rosatom State Corporation sites. It is underlined that most of the regulatory and methodological documents for this subject area have been developed under the U.S.-Russian MPC&A Program. According to the joint management plan developed and agreed upon by the parties in 2005, nearly 50 physical protection documents were identified to be developed, approved and implemented at Rosatom sites by 2012. It is also noted that, on the whole, the plans have been fulfilled.

  4. Headquarters Facilities Master Security Plan - Chapter 2, Limited...

    Broader source: Energy.gov (indexed) [DOE]

    and termination of areas within HQ buildings where classified activities take place. ... Master Security Plan - Chapter 5, Classified Matter Protection and Control ...

  5. Headquarters Facilities Master Security Plan - Chapter 13, Controlled...

    Broader source: Energy.gov (indexed) [DOE]

    3, Controlled Unclassified Information CUI consists of information that is not classified, but it is so sensitive that it requires special handling and protection. CUI includes ...

  6. Headquarters Facilities Master Security Plan - Chapter 11, Incidents...

    Office of Environmental Management (EM)

    Security Plan - Chapter 11, Incidents of Security Concern Whenever a failure to properly protect classified matter is detected, it must be formally reported and investigated. ...

  7. Headquarters Facilities Master Security Plan - Chapter 13, Controlled...

    Energy Savers [EERE]

    ... If encryption is not available and transmission by mail is not a feasible alternative, the document should be sent password protected, and the password communicated by separate ...

  8. A Physical Protection Systems Test Bed for International Counter-Trafficking System Development

    SciTech Connect (OSTI)

    Stinson, Brad J; Kuhn, Michael J; Donaldson, Terrence L; Richardson, Dave; Rowe, Nathan C; Younkin, James R; Pickett, Chris A

    2011-01-01

    Physical protection systems have a widespread impact on the nuclear industry in areas such as nuclear safeguards, arms control, and trafficking of illicit goods (e.g., nuclear materials) across international borders around the world. Many challenges must be overcome in design and deployment of foreign border security systems such as lack of infrastructure, extreme environmental conditions, limited knowledge of terrain, insider threats, and occasional cultural resistance. Successful security systems, whether it be a system designed to secure a single facility or a whole border security system, rely on the entire integrated system composed of multiple subsystems. This test bed is composed of many unique sensors and subsystems, including wireless unattended ground sensors, a buried fiber-optic acoustic sensor, a lossy coaxial distributed sensor, wireless links, pan-tilt-zoom cameras, mobile power generation systems, unmanned aerial vehicles, and fiber-optic-fence intrusion detection systems. A Common Operating Picture software architecture is utilized to integrate a number of these subsystems. We are currently performance testing each system for border security and perimeter security applications by examining metrics such as probability of sense and a qualitative understanding of the sensor s vulnerability of defeat. The testing process includes different soil conditions for buried sensors (e.g., dry, wet, and frozen) and an array of different tests including walking, running, stealth detection, and vehicle detection. Also, long term sustainability of systems is tested including performance differences due to seasonal variations (e.g. summer versus winter, while raining, in foggy conditions). The capabilities of the test bed are discussed. Performance testing results, both at the individual component level and integrated into a larger system for a specific deployment (in situ), help illustrate the usefulness and need for integrated testing facilities to carry out this

  9. Radiological Threat Reduction (RTR) program : implementing physical security to protect large radioactive sources worldwide.

    SciTech Connect (OSTI)

    Lowe, Daniel L.

    2004-11-01

    The U.S. Department of Energy's Radiological Threat Reduction (RTR) Program strives to reduce the threat of a Radiological Dispersion Device (RDD) incident that could affect U.S. interests worldwide. Sandia National Laboratories supports the RTR program on many different levels. Sandia works directly with DOE to develop strategies, including the selection of countries to receive support and the identification of radioactive materials to be protected. Sandia also works with DOE in the development of guidelines and in training DOE project managers in physical protection principles. Other support to DOE includes performing rapid assessments and providing guidance for establishing foreign regulatory and knowledge infrastructure. Sandia works directly with foreign governments to establish cooperative agreements necessary to implement the RTR Program efforts to protect radioactive sources. Once necessary agreements are in place, Sandia works with in-country organizations to implement various security related initiatives, such as installing security systems and searching for (and securing) orphaned radioactive sources. The radioactive materials of interest to the RTR program include Cobalt 60, Cesium 137, Strontium 90, Iridium 192, Radium 226, Plutonium 238, Americium 241, Californium 252, and Others. Security systems are implemented using a standardized approach that provides consistency through out the RTR program efforts at Sandia. The approach incorporates a series of major tasks that overlap in order to provide continuity. The major task sequence is to: Establish in-country contacts - integrators, Obtain material characterizations, Perform site assessments and vulnerability assessments, Develop upgrade plans, Procure and install equipment, Conduct acceptance testing and performance testing, Develop procedures, and Conduct training. Other tasks are incorporated as appropriate and commonly include such as support of reconfiguring infrastructure, and developing security

  10. Energy Department Issues Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement

  11. All Other Editions are Obsolete U.S. DEPARTMENT OF ENERGY HEADQUARTERS...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. DEPARTMENT OF ENERGY HEADQUARTERS EMPLOYEE FINAL SEPARATION CLEARANCE Form should ... PART I - TO BE COMPLETED BY EMPLOYEE OR OFFICE TO WHICH THE EMPLOYEE IS ASSIGNED 1. ...

  12. EM Headquarters Employees Give More than $51,000 to 2015 Combined Federal Campaign

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – Final results of the 2015 Combined Federal Campaign (CFC) show EM headquarters employees donated more than $51,000 to people in need through the federal government’s workplace charitable giving drive.

  13. Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March 2003

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE Headquarters (HQ) in February 2003.

  14. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  15. Annual Fire Protection Summary Information Reporting Guide | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Summary Information Reporting Guide Annual Fire Protection Summary Information Reporting Guide May 2011 The Department of Energy (DOE) Annual Fire Protection Program Summary continues the series started in 1972. The report annually summarizes monetary loss information sent to Headquarters by reporting elements. The Department of Energy (DOE) Annual Fire Protection Program Summary annually summarizes monetary loss information sent to Headquarters by reporting elements. Since May 1950,

  16. Methodology Development and Applications of Proliferation Resistance and Physical Protection Evaluation.

    SciTech Connect (OSTI)

    Bari, R.A.; Peterson, P.F., Therios, I.U., Whitlock, J.J.

    2010-04-11

    We present an overview of the program on the evaluation methodology for proliferation resistance and physical protection (PR&PP) of advanced nuclear energy systems (NESs) sponsored by the Generation IV International Forum (GIF). For a proposed NES design, the methodology defines a set of challenges, analyzes system response to these challenges, and assesses outcomes. The challenges to the NES are the threats posed by potential actors (proliferant States or sub-national adversaries). The characteristics of Generation IV systems, both technical and institutional, are used to evaluate the response of the system and to determine its resistance against proliferation threats and robustness against sabotage and terrorism threats. The outcomes of the system response are expressed in terms of a set of measures, which are the high-level PR&PP characteristics of the NES. The methodology is organized to allow evaluations to be performed at the earliest stages of system design and to become more detailed and more representative as the design progresses. It can thus be used to enable a program in safeguards by design or to enhance the conceptual design process of an NES with regard to intrinsic features for PR&PP.

  17. Physical Protection of Spent Fuel Shipments: Resolution of Stakeholder Concerns Through Rulemaking - 12284

    SciTech Connect (OSTI)

    Ballard, James D.; Halstead, Robert J.; Dilger, Fred

    2012-07-01

    In 1999, the State of Nevada brought its concerns about physical protection of current spent nuclear fuel (SNF) shipments, and future SNF shipments to a federal repository, before the NRC in a 1999 petition for rulemaking (PRM-73-10). In October 2010, the NRC published a rulemaking decision which would significantly strengthen physical protection of SNF in transit. The newest articulation of the rule (10 CFR 73.37) incorporates regulatory clarifications and security enhancements requested in Nevada's 1999 petition for rulemaking, codifies the findings of the Nuclear NRC and DOE consequence analyses into policy guidance documents and brings forward into regulations the agency and licensee experience gained since the terrorist attacks of September 11, 2001. Although at present DOE SNF shipments would continue to be exempt from these NRC regulations, Nevada considers the rule to constitute a largely satisfactory resolution to stakeholder concerns raised in the original petition and in subsequent comments submitted to the NRC. This paper reviews the process of regulatory changes, assesses the specific improvements contained in the new rules and briefly describes the significance of the new rule in the context of a future national nuclear waste management program. Nevada's petition for rulemaking led to a generally satisfactory resolution of the State's concerns. The decade plus timeframe from petition to rulemaking conclusion saw a sea change in many aspects of the relevant issues - perhaps most importantly the attacks on 9/11 led to the recognition by regulatory bodies that a new threat environment exists wherein shipments of SNF and HLW pose a viable target for human initiated events. The State of Nevada has always considered security a critical concern for the transport of these highly radioactive materials. This was one of the primary reasons for the original rulemaking petition and subsequent advocacy by Nevada on related issues. NRC decisions on the majority of

  18. Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process | Department of Energy 71.1 Headquarters Business Clearance Process Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and

  19. I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ' I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation ' Pilot Plant February SJ 2014 Washington, DC 20585 August 2014 Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 Prepared : James Hutton Acting Deputy Assistant Secretary for Safety,

  20. Workshop materials from the 2nd international training course on physical protection of nuclear facilities and materials, Module 13

    SciTech Connect (OSTI)

    Martin, F. P.

    1980-04-01

    This course is intended for representatives of countries where nuclear power is being developed and whose responsibilities include the preparation of regulation and the design and evaluation of physical protection systems. This is the second of two volumes; the first volume is SAND-79-1090. (DLC)

  1. Topics in radiation at accelerators: Radiation physics for personnel and environmental protection

    SciTech Connect (OSTI)

    Cossairt, J.D.

    1993-11-01

    This report discusses the following topics: Composition of Accelerator Radiation Fields; Shielding of Electrons and Photons at Accelerators; Shielding of Hadrons at Accelerators; Low Energy Prompt Radiation Phenomena; Induced Radioactivity at Accelerators; Topics in Radiation Protection Instrumentation at Accelerators; and Accelerator Radiation Protection Program Elements.

  2. Expedient Respiratory and Physical Protection: Does a Wet Towel Work to Prevent Chemical Warfare Agent Vapor Infiltration?

    SciTech Connect (OSTI)

    Sorensen, J.H.

    2002-08-30

    The purpose of this paper is to examine the effectiveness of expedient protection strategies to reduce exposure to vapors from chemical warfare agents. This includes an examination of the physical and the psychological effectiveness of measures such as using a wet towel to seal a door jam against the infiltration of chemicals while sheltering in place or to provide expedient respiratory protection. Respiratory protection for civilians has never been considered a viable option for population protection in the CSEPP. Problems of storage, ability to effectively don respirators, and questionable fit have been primary factors in rejecting this option. Expedient respiratory protection seems to offer little benefits for population protection for chemical agent vapors. Furthermore, using wet towels as a vapor barrier at the bottom of a door should be discouraged. The wetted towel provides no vapor filtration and its effectiveness in infiltration reduction is unknown. Taping the bottom of the door will still likely provide greater infiltration reduction and is recommended as the current method for use in sheltering.

  3. 2016 Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control

    Energy Savers [EERE]

    6 DOE Sustainability Awards 2016 DOE Sustainability Awards In 2016, the U.S. Department of Energy (DOE) Sustainability Performance Office recognized 15 teams and individuals representing DOE sites and national laboratories. These winners are being recognized for their outstanding sustainability contributions, including accomplishments in managing pollution, waste, energy, water, and vehicle fleets. Below find the descriptions of the 2016 DOE Sustainability Award winners organized by award

  4. Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Group (PDG) Organizations American Institute of Physics (AIP) American Physical Society (APS) Institute of Physics (IOP) SPIE - International society for optics and photonics Top...

  5. U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan for Environmental Management Headquarters Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Washington, DC 20585 March 2015 Page 3 of 32 TABLE OF CONTENTS 1.0 PURPOSE ..................................................................................................................................................5 2.0 BACKGROUND

  6. Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Physics Print Because a large proportion of ALS experiments are "physics" experiments, it's useful to separate them into two categories - one focused on Materials/Condensed Matter, and this one, with a dual focus on AMO (atomic, molecular, and optical) physics and accelerator physics. Light sources such as the ALS have opened up research frontiers that may hold the answers to fundamental questions about structure and dynamics in AMO physics. The advanced spectroscopies that

  7. Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Print Because a large proportion of ALS experiments are "physics" experiments, it's useful to separate them into two categories - one focused on Materials/Condensed Matter, and this one, with a dual focus on AMO (atomic, molecular, and optical) physics and accelerator physics. Light sources such as the ALS have opened up research frontiers that may hold the answers to fundamental questions about structure and dynamics in AMO physics. The advanced spectroscopies that have been

  8. Summary report on transportation of nuclear fuel materials in Japan : transportation infrastructure, threats identified in open literature, and physical protection regulations.

    SciTech Connect (OSTI)

    Cochran, John Russell; Ouchi, Yuichiro; Furaus, James Phillip; Marincel, Michelle K.

    2008-03-01

    This report summarizes the results of three detailed studies of the physical protection systems for the protection of nuclear materials transport in Japan, with an emphasis on the transportation of mixed oxide fuel materials1. The Japanese infrastructure for transporting nuclear fuel materials is addressed in the first section. The second section of this report presents a summary of baseline data from the open literature on the threats of sabotage and theft during the transport of nuclear fuel materials in Japan. The third section summarizes a review of current International Atomic Energy Agency, Japanese and United States guidelines and regulations concerning the physical protection for the transportation of nuclear fuel materials.

  9. Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Physics Our science answers questions about the nature of the universe and delivers solutions for national security concerns. Contact Us Division Leader David Meyerhofer Deputy Division Leader Scott Wilburn Division Office (505) 667-4117 For more than 70 years-from the Manhattan Project to today-Physics Division researchers have been performing groundbreaking fundamental and applied research. For more than 70 years-from the Manhattan Project to today-Physics Division researchers have

  10. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC&A Program

    SciTech Connect (OSTI)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-10-07

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC&A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC&A regulations.

  11. Accident Investigation of the June 1, 2013, Stairway Fall Resulting in a Federal Employee Fatality at DOE Headquarters Germantown, Maryland

    Broader source: Energy.gov [DOE]

    On June 28, 2013, an Accident Investigation Board was appointed to investigate an accident at the Department of Energy Germantown Headquarters facility, on June 1, 2013 that resulted in a fatality on June 24, 2013.

  12. Fire Protection Database | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fire Protection Database Fire Protection Database DOE O 231.1, Environment, Safety, And Health Reporting, requires the submission of an Annual Fire Protection Summary. The previous process used to collect the required data utilizes a Microsoft Access database that was downloaded, completed by the field and then sent to Headquarters for summation and analysis by engineers in Office of Sustainability Support. Data collection for the CY2013 Summary will begin Jan. 1, 2014, and a commitment has been

  13. FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requests received by DOE Headquarters (HQ) since December 31, 2008 FOIA Request Number Subject Date Received Estimated Completion Date FOIA-2009-000002 Copies of all applications submitted to DOE under the Advanced Technology Vehicles Manufacturing Incentive Program 1/5/2009 5/29/2009 FOIA-2009-000003 Contract number that ITP currently holds and that GSA 332345/DOE RQ52-09NA28647 is replacing or re-competing 1/5/2009 Closed at HQ and transferred to the Savannah River Office on 1/16/2009

  14. Solar-heated hot water instrumentation project for EPRI Headquarters complex, Palo Alto, California. Final report

    SciTech Connect (OSTI)

    Whitehouse, H.T.; Ortiz, P.

    1981-01-01

    A data acquisition and analysis effort charted the performance of a solar-assisted, hot water preheat system supplying a portion of the service water needs at the EPRI Headquarters complex in Palo Alto, California. The project commenced in June of 1978, with active data acquisition transpiring over a 12-month period from December 1, 1978, to November 30, 1979. Detailed load and performance data for the system are presented, the merits of the data acquisition system employed are discussed, and recommendations for future monitoring efforts are provided.

  15. Capitol Area East End, Block 225: California Department of Education Headquarters

    High Performance Buildings Database

    Sacramento, CA The California Department of Education Headquarters, Block 225 was the first of the five buildings to make up the Capitol Area East End Complex. The entire project is being developed by the California Department of General Services Real Estate Division. At 336,000 square feet and six stories high, Block 225 was the most ambitious green-building initiative to have been undertaken by the State at that time and the largest office building project ever undertaken by the State. The project was delivered through a bridged design-build process.

  16. All Other Editions are Obsolete U.S. DEPARTMENT OF ENERGY HEADQUARTERS EMPLOYEE FINAL SEPARATION CLEARANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3293.1 (1-12) All Other Editions are Obsolete U.S. DEPARTMENT OF ENERGY HEADQUARTERS EMPLOYEE FINAL SEPARATION CLEARANCE Form should reach the Office of Security and the HQ Servicing Human Resources office on the last day of active duty. PART I - TO BE COMPLETED BY EMPLOYEE OR OFFICE TO WHICH THE EMPLOYEE IS ASSIGNED 1. EMPLOYEE NAME 2. Employee Phone 3. Last Day of Active Duty 4. Position Title Series-Grade Division or Office 5. Forwarding Address PART II - TO BE COMPLETED BY THE EMPLOYEE AND

  17. Challenges to Integration of Safety and Reliability with Proliferation Resistance and Physical Protection for Generation IV Nuclear Energy Systems

    SciTech Connect (OSTI)

    H. Khalil; P. F. Peterson; R. Bari; G. -L. Fiorini; T. Leahy; R. Versluis

    2012-07-01

    The optimization of a nuclear energy system's performance requires an integrated consideration of multiple design goals - sustainability, safety and reliability (S&R), proliferation resistance and physical protection (PR&PP), and economics - as well as careful evaluation of trade-offs for different system design and operating parameters. Design approaches motivated by each of the goal areas (in isolation from the other goal areas) may be mutually compatible or in conflict. However, no systematic methodology approach has yet been developed to identify and maximize synergies and optimally balance conflicts across the possible design configurations and operating modes of a nuclear energy system. Because most Generation IV systems are at an early stage of development, design, and assessment, designers and analysts are only beginning to identify synergies and conflicts between PR&PP, S&R, and economics goals. The close coupling between PR&PP and S&R goals has motivated early attention within the Generation IV International Forum to their integrated consideration to facilitate the optimization of their effects and the minimization of potential conflicts. This paper discusses the status of this work.

  18. Pathway Aggregation in the Risk Assessment of Proliferation Resistance and Physical Protection (PR&PP) of Nuclear Energy Systems

    SciTech Connect (OSTI)

    Aldemir, Tunc; Denning, Richard; Catalyurek, Umit; Yilmaz, Alper; Yue, Meng; Cheng, Lap-Yan

    2015-01-23

    The framework for Proliferation Resistance and Physical Protection (PR & PP) evaluation is to define a set of challenges, to obtain the system responses, and to assess the outcomes. The assessment of outcomes heavily relies on pathways, defined as sequences of events or actions that could potentially be followed by a State or a group of individuals in order to achieve a proliferation objective, with the defined threats as initiating events. There may be large number of segments connecting pathway stages (e.g. acquisition, processing, and fabrication for PR) which can lead to even larger number of pathways or scenarios through possible different combinations of segment connections, each with associated probabilities contributing to the overall risk. Clustering of these scenarios in specified stage attribute intervals is important for their tractable analysis and outcome assessment. A software tool for scenario generation and clustering (OSUPR) is developed that utilizes the PRCALC code developed at the Brookhaven National Laboratory for scenario generation and the K- means, mean shift and adaptive mean shift algorithms as possible clustering schemes. The results of the study using the Example Sodium Fast Breeder as an example system show that clustering facilitates the probabilistic or deterministic analysis of scenarios to identify system vulnerabilities and communication of the major risk contributors to stakeholders. The results of the study also show that the mean shift algorithm has the most potential for assisting the analysis of the scenarios generated by PRCALC.

  19. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for United States Coast Guard Headquarters

    SciTech Connect (OSTI)

    Schey, Stephen; Francfort, Jim

    2015-05-01

    Federal agencies are mandated to purchase alternative fuel vehicles, increase consumption of alternative fuels, and reduce petroleum consumption. Available plug-in electric vehicles (PEVs) provide an attractive option in the selection of alternative fuel vehicles. PEVs, which consist of both battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have significant advantages over internal combustion engine (ICE) vehicles in terms of energy efficiency, reduced petroleum consumption, and reduced production of greenhouse gas (GHG) emissions, and they provide performance benefits with quieter, smoother operation. This study intended to evaluate the extent to which the United States Coast Guard Headquarters (USCG HQ) could convert part or all of their fleet of vehicles from petroleum-fueled vehicles to PEVs.

  20. 20th International Training Course (ITC-20) on the physical protection of nuclear facilities and materials evaluation report.

    SciTech Connect (OSTI)

    Ramirez, Amanda Ann

    2008-09-01

    The goal of this evaluation report is to provide the information necessary to improve the effectiveness of the ITC provided to the International Atomic Energy Agency Member States. This report examines ITC-20 training content, delivery methods, scheduling, and logistics. Ultimately, this report evaluates whether the course provides the knowledge and skills necessary to meet the participants needs in the protection of nuclear materials and facilities.

  1. Demonstration Assessment of Light-Emitting Diode Parking Structure Lighting at U.S. Department of Labor Headquarters

    SciTech Connect (OSTI)

    Kinzey, Bruce R.; Myer, Michael

    2013-03-01

    This report documents a solid-state lighting (SSL) technology demonstration at the parking structure of the U.S. Department of Labor (DOL) Headquarters in Washington, DC, in which light-emitting diode (LED) luminaires were substituted for the incumbent high-pressure sodium (HPS) luminaires and evaluated for relative light quantity and performance. The demonstration results show energy savings of 52% from the initial conversion of HPS to the LED product. These savings were increased to 88% by using occupancy sensor controls that were ultimately set to reduce power to 10% of high state operation after a time delay of 2.5 minutes. Because of the relatively high cost of the LED luminaires at their time of purchase for this project (2010), the simple payback periods were 6.5 years and 4.9 years for retrofit and new construction scenarios, respectively. Staff at DOL Headquarters reported high satisfaction with the operation of the LED product.

  2. A historical review of portable health physics instruments and their use in radiation protection programs at Hanford, 1944 through 1988

    SciTech Connect (OSTI)

    Howell, W.P.; Kenoyer, J.L.; Kress, M.L.; Swinth, K.L.; Corbit, C.D.; Zuerner, L.V.; Fleming, D.M.; DeHaven, H.W.

    1989-09-01

    This historical review covers portable health physics instruments at Hanford from an applications viewpoint. The review provides information on specific instruments and on the general kinds of facility work environments in which the instruments have been and are being used. It provides a short, modestly technical explanation of the types of nuclear radiations, the way radiation units are quantified, and the types of nuclear radiations, the way radiation units are quantified, and the types of detection media used in portable health physics instruments. This document does not, however, cover the history of the entire Hanford program that was required to develop and/or modify the subject instruments. 11 refs., 34 figs., 2 tabs.

  3. Operational Radiation Protection in High-Energy Physics Accelerators: Implementation of ALARA in Design and Operation of Accelerators

    SciTech Connect (OSTI)

    Fasso, A.; Rokni, S.; /SLAC

    2011-06-30

    It used to happen often, to us accelerator radiation protection staff, to be asked by a new radiation worker: ?How much dose am I still allowed?? And we smiled looking at the shocked reaction to our answer: ?You are not allowed any dose?. Nowadays, also thanks to improved training programs, this kind of question has become less frequent, but it is still not always easy to convince workers that staying below the exposure limits is not sufficient. After all, radiation is still the only harmful agent for which this is true: for all other risks in everyday life, from road speed limits to concentration of hazardous chemicals in air and water, compliance to regulations is ensured by keeping below a certain value. It appears that a tendency is starting to develop to extend the radiation approach to other pollutants (1), but it will take some time before the new attitude makes it way into national legislations.

  4. Protection Program Operations - DOE Directives, Delegations,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.3, Protection Program Operations by jcronin Functional areas: Physical Protection, Protective Force, Safeguards, Security, and Emergency Management The Order establishes...

  5. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  6. The greening of the U.S. Department of Energy Headquarters, Washington, D.C. Second-year status report

    SciTech Connect (OSTI)

    1998-04-22

    The Greening of the Department of Energy Headquarters is a comprehensive, multi-year project designed to identify and implement specific actions DOE can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It is part of the Administration`s overall effort to promote greening in all of the nation`s federal buildings. Present Clinton started the Greening of the White House in 1993, and similar efforts have been undertaken by the Department of Defense at the Pentagon, the National Park Service at the Presidio, and now the Department of Energy at the Forrestal and Germantown buildings. The Greening of the Department of Energy Headquarters, An Action Plan for Success (Action Plan), unveiled on April 22, 1996, outlined more than 80 action items for DOE`s Forrestal and Germantown buildings. The action items were designed to increase energy efficiency, improve resource management, improve air quality, reduce water use, reduce paper use, improve landscape management, improve maintenance and operational procedures, increase employee participation, and promote education and outreach. In the two years since the Action Plan was introduced, the Department of Energy has made major progress in implementing specific action items designed to target four major subject areas: (1) Energy Efficiency; (2) Resource Management; (3) Air, Water, Landscape, and (4) Human Factors. This report outlines the status of the recommendations of the Action Plan since they were introduced two years ago.

  7. Health Physics Positions Data Base: Revision 1

    SciTech Connect (OSTI)

    Kerr, G.D.; Borges, T.; Stafford, R.S.; Lu, P.Y.; Carter, D.

    1994-02-01

    The Health Physics Positions (HPPOS) Data Base of the Nuclear Regulatory Commission (NRC) is a collection of NRC staff positions on a wide range of topics involving radiation protection (health physics). It consists of 328 documents in the form of letters, memoranda, and excerpts from technical reports. The HPPOS Data Base was developed by the NRC Headquarters and Regional Offices to help ensure uniformity in inspections, enforcement, and licensing actions. Staff members of the Oak Ridge National Laboratory (ORNL) have assisted the NRC staff in summarizing the documents during the preparation of this NUREG report. These summaries are also being made available as a {open_quotes}stand alone{close_quotes} software package for IBM and IBM-compatible personal computers. The software package for this report is called HPPOS Version 2.0. A variety of indexing schemes were used to increase the usefulness of the NUREG report and its associated software. The software package and the summaries in the report are written in the context of the {open_quotes}new{close_quotes} 10 CFR Part 20 ({section}{section}20.1001--20.2401). The purpose of this NUREG report is to allow interested individuals to familiarize themselves with the contents of the HPPOS Data Base and with the basis of many NRC decisions and regulations. The HPPOS summaries and original documents are intended to serve as a source of information for radiation protection programs at nuclear research and power reactors, nuclear medicine, and other industries that either process or use nuclear materials.

  8. Feedback and Continuous Improvement Inspection Criteria and Approach - DOE Headquarters, CRAD 64-22

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 1.0 PURPOSE Within the Office of Independent O\,ersight, the Office of Environment, Safety and Health (ES&H) Evaluations' mission is to assess the effectiveness of those environment, safety, and health systems and practices used by field organizations in implementing Integrated Safety Management and to provide clear, concise, and independent evaluatio~ls of performance in protecting our workers, the public, and the environment from the hazards associated with Department of Energy (DOE)

  9. Headquarters Security Quick Reference Book Headquarters Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Directive HSS Office of Health, Safety and Security HQ ... Regulations 707, a negative drug test result is required ... knowledgeable of security policy at HQ. Consult the HQFMSP ...

  10. Revised DOE Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process (wrong document under this file name)

    Broader source: Energy.gov [DOE]

    There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which could improve Acquisition Guide Chapter 71.1 and the understanding of the Business Clearance process. Attached is the revised Acquisition Guide Chapter 71.1 (May 20 10) which reflects the comments and suggestions received.

  11. Use of Circadian Lighting System to improve night shift alertness and performance of NRC Headquarters Operations Officers

    SciTech Connect (OSTI)

    Baker, T.L.; Morisseau, D.; Murphy, N.M.

    1995-04-01

    The Nuclear Regulatory Commission`s (NRC) Headquarters Operations Officers (HOOs) receive and respond to events reported in the nuclear industry on a 24-hour basis. The HOOs have reported reduced alertness on the night shift, leading to a potential deterioration in their on-shift cognitive performance during the early morning hours. For some HOOs, maladaptation to the night shift was also reported to be the principal cause of: (a) reduced alertness during the commute to and from work, (b) poor sleep quality, and (c) personal lifestyle problems. ShiftWork Systems, Inc. (SWS) designed and installed a Circadian Lighting System (CLS) at both the Bethesda and Rockville HOO stations with the goal of facilitating the HOOs physiological adjustment to their night shift schedules. The data indicate the following findings: less subjective fatigue on night shifts; improved night shift alertness and mental performance; higher HOO confidence in their ability to assess event reports; longer, deeper and more restorative day sleep after night duty shifts; swifter adaptation to night work; and a safer commute, particularly for those with extensive drives.

  12. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-03-23

    The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1.

  13. River Protection Project FY 2000 Multi Year Work Plan Summary

    SciTech Connect (OSTI)

    LENSEIGNE, D.L.

    1999-08-27

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort.

  14. Protection Program Operations (11-18-10)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-18

    This new Order will combine the current requirements of DOE Manuals 470.4-2A, Physical Protection; M 470.4-3A, Protective Force; and 470.4-8, Federal Protective Force, into a single consolidated, streamlined Order.

  15. GREENING DOE HEADQUARTERS

    Energy Savers [EERE]

    ... false arrest, unlawful search and seizure, deprivation ... of borrowed funds and will enter a final order and damages ... treated, and disposed of in compliance with its terms. ...

  16. EG and G Idaho Environmental Protection Implementation Plan (1991)

    SciTech Connect (OSTI)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  17. Workplace Charging Challenge Partner: Lane Regional Air Protection Agency

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2014Headquarters: Springfield, ORCharging Location: Springfield, ORDomestic Employees: 15

  18. material protection

    National Nuclear Security Administration (NNSA)

    %2A en Office of Weapons Material Protection http:www.nnsa.energy.govaboutusourprogramsnonproliferationprogramofficesinternationalmaterialprotectionandcooperation-1

  19. material protection

    National Nuclear Security Administration (NNSA)

    %2A en Office of Weapons Material Protection http:nnsa.energy.govaboutusourprogramsnonproliferationprogramofficesinternationalmaterialprotectionandcooperation-1

  20. protective force

    National Nuclear Security Administration (NNSA)

    ntex%20-%20protective%20force%20-%20edited.jpg" alt"successfully completed a recent assessment by the U.S. Department " >

    Members of Pantex's Protective Force on...

  1. ORISE: Health Physics Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Health Physics Training Student performs an analysis during an ORAU health physics training course Training and educating a highly skilled workforce that can meet operational commitments in the areas of radiation and health physics is an essential part of protecting your workers, the public and the environment. ORAU, the managing contractor of the Oak Ridge Institute for Science and Education, offers hands-on, laboratory-based training courses in a variety of health physics areas. Training

  2. Protections: Sampling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protections: Sampling Protections: Sampling Protection #3: Sampling for known and unexpected contaminants August 1, 2013 Monitoring stormwater in Los Alamos Canyon Monitoring stormwater in Los Alamos Canyon The Environmental Sampling Board, a key piece of the Strategy, ensures that LANL collects relevant and appropriate data to answer questions about the protection of human and environmental health, and to satisfy regulatory requirements. LANL must demonstrate the data are technically justified

  3. Alkali metal protective garment and composite material

    DOE Patents [OSTI]

    Ballif, III, John L.; Yuan, Wei W.

    1980-01-01

    A protective garment and composite material providing satisfactory heat resistance and physical protection for articles and personnel exposed to hot molten alkali metals, such as sodium. Physical protection is provided by a continuous layer of nickel foil. Heat resistance is provided by an underlying backing layer of thermal insulation. Overlying outer layers of fireproof woven ceramic fibers are used to protect the foil during storage and handling.

  4. Protecting Wildlife

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protecting Wildlife Protecting Wildlife We monitor and protect the wildlife and their habitats on Laboratory property. February 2, 2015 Mule deer on LANL property LANL has been home to mule deer since its creation in 1942 and has seasonally been home to elk since their reintroduction to New Mexico in the 1960s. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Protecting our wildlife Since the early 1940s, LANL's

  5. Protections: Sampling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection 3: Sampling for known and unexpected contaminants August 1, 2013 Monitoring stormwater in Los Alamos Canyon Monitoring stormwater in Los Alamos Canyon The Environmental ...

  6. Fire Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-05

    This Standard was developed to provide acceptable methods and approaches for meeting DOE fire protection program and design requirements and to address special or unique fire protection issues at DOE facilities that are not comprehensively or adequately addressed in national consensus standards or other design criteria.

  7. Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes requirements for management and operation of the DOE Protective Force (PF), establishes requirements for firearms operations and defines the firearms courses of fire. Cancels: DOE M 473.2-1A DOE M 473.2-2

  8. Fire Protection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... room application. (Refer to NFPA 318, Standard for the Protection of Semiconductor Fabrication Facilities.) See also Appendix A of DOE-STD-1066-99 for information on other types ...

  9. Corrosion protection

    DOE Patents [OSTI]

    Brown, Donald W.; Wagh, Arun S.

    2003-05-27

    There has been invented a chemically bonded phosphate corrosion protection material and process for application of the corrosion protection material for corrosion prevention. A slurry of iron oxide and phosphoric acid is used to contact a warm surface of iron, steel or other metal to be treated. In the presence of ferrous ions from the iron, steel or other metal, the slurry reacts to form iron phosphates which form grains chemically bonded onto the surface of the steel.

  10. Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-07

    The manual establishes requirements for management and operation of the DOE Protective Force, establishes requirements for firearms operations and defines the firearms courses of fire. Chg 1 dated 3/7/06. DOE M 470.4-3A cancels DOE M 470.4-3, Chg 1, Protective Force, dated 3-7-06, Attachment 2, Contractor Requirement Document (CRD) only (except for Section C). Chg 1, dated 3-7-06, cancels DOE M 470.4-3

  11. ORISE: Human Subjects Protection Resource Protection Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human Subjects Protection Resource Book The Human Subjects Protection Resource Book synthesizes information currently available on the protection of human subjects in research, the ...

  12. PHYSICAL SCIENCES, Physics Phase

    Office of Scientific and Technical Information (OSTI)

    SCIENCES, Physics Phase competition in trisected superconducting dome I. M. Vishik, 1, 2 M Hashimoto, 3 R.-H. He, 4 W. S. Lee, 1, 2 F. Schmitt, 1, 2 D. H. Lu, 3 R. G. Moore, 1...

  13. weapons material protection | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    material protection

  14. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  15. Basic physical and chemical information needed for development...

    Office of Scientific and Technical Information (OSTI)

    Language: English Subject: 73 NUCLEAR PHYSICS AND RADIATION PHYSICS; 61 RADIATION PROTECTION AND DOSIMETRY; 62 RADIOLOGY AND NUCLEAR MEDICINE; TRANSPORT THEORY; MONTE CARLO METHOD; ...

  16. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Energy Savers [EERE]

    ... with each party; these meetings are confidential. * Once all issues have been ... It's Confidential You speak without fear that your words will be used against you in ...

  17. Headquarters Facilities Master Security Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... A Security Termination Briefing is available in DVD format from the HSO Program Manager. The DVD is especially useful in processing large numbers of employees departing in a short ...

  18. Headquarters Facilities Master Security Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The servicing badge office provides information on how to access the online briefing. The ... The briefing includes an overview of HQ security programs, access control procedures, ...

  19. Headquarters Awards | Department of Energy

    Office of Environmental Management (EM)

    Documents Available for Download July 18, 2008 Article 29 Employee Awards This award is ... Expectation" (ME) or higher, udess the employee has been rated at "Needs Improvement" or ...

  20. HEADQUARTERS MEDIATION PROGRAM MEDIATION WORKS!

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEDIATION WORKS Mediation helps to build relationships. People solve their own problems ... It Preserves Relationships You resolve your dispute while building a better relationship ...

  1. Preliminary Energy Analysis of the Pennsylvania Department of Environmental Protection's Cambria Office Building Ebensburg, PA

    SciTech Connect (OSTI)

    Deru, M.; Hancock, E.

    2003-01-01

    The Pennsylvania Department of Environmental Protection (DEP) has undertaken a path to build''high performance green'' buildings as part of the objectives of the Governors Green Government Council. The first building, completed in 1998, is used as the DEPs regional headquarters in Harrisburg. The Cambria office, located in Ebensburg, is DEPs second building. Many of the lessons learned from the first building were successfully applied to this building, which was completed in 2000. The objective was to provide a comfortable and productive work environment while minimizing its short- and long-term environmental impacts.

  2. Security Policy, Guidance & Reports

    Broader source: Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive. The Office is responsible for the principal personnel security information processing activities of the Department and personnel security administrative review process. The Office of Headquarters Security Operations provides oversight and direction support to all Headquarters security operations to include physical protection, information security, personnel security, and guidance to the Headquarters Security Officers (HSO).

  3. Alliance Project: Cyber-Physical Security Unified Access Solution

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alliance Project: Cyber-Physical Security Unified Access Solution Unified cyber-physical security to protect energy sector control systems and facilities Background The North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards require utility operators to control, monitor, and record physical access to cybersecurity assets and establish physical security perimeters (PSPs). Many operators engage security contractors to provide access controls,

  4. Physics Fellow

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as Institute of Physics Fellow January 18, 2011 LOS ALAMOS, New Mexico, January 18, ... simulation, and computation, has been selected as a Fellow of the Institute of Physics. ...

  5. Nuclear Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Physics Nuclear Physics Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy security. ...

  6. Theoretical Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP Theoretical Physics Understanding discoveries at the Energy, Intensity, and Cosmic Frontiers Get ... HEP Theory at Los Alamos The Theoretical High Energy Physics group at ...

  7. Protective coatings for sensitive materials

    SciTech Connect (OSTI)

    Egert, C.M.

    1997-08-05

    An enhanced protective coating is disclosed to prevent interaction between constituents of the environment and devices that can be damaged by those constituents. This coating is provided by applying a synergistic combination of diffusion barrier and physical barrier materials. These materials can be, for example, in the form of a plurality of layers of a diffusion barrier and a physical barrier, with these barrier layers being alternated. Further protection in certain instances is provided by including at least one layer of a getter material to actually react with one or more of the deleterious constituents. The coating is illustrated by using alternating layers of an organic coating (such as Parylene-C{trademark}) as the diffusion barrier, and a metal coating (such as aluminum) as the physical barrier. For best results there needs to be more than one of at least one of the constituent layers. 4 figs.

  8. Protective coatings for sensitive materials

    SciTech Connect (OSTI)

    Egert, Charles M.

    1997-01-01

    An enhanced protective coating to prevent interaction between constituents of the environment and devices that can be damaged by those constituents. This coating is provided by applying a synergistic combination of diffusion barrier and physical barrier materials. These materials can be, for example, in the form of a plurality of layers of a diffusion barrier and a physical barrier, with these barrier layers being alternated. Further protection in certain instances is provided by including at least one layer of a getter material to actually react with one or more of the deleterious constituents. The coating is illustrated by using alternating layers of an organic coating (such as Parylene-C.TM.) as the diffusion barrier, and a metal coating (such as aluminum) as the physical barrier. For best results there needs to be more than one of at least one of the constituent layers.

  9. National Infrastructure Protection Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Infrastructure Protection Plan National Infrastructure Protection Plan Protecting the critical infrastructure and key resources (CI/KR) of the United States is essential to the Nation's security, public health and safety, economic vitality, and way of life. Attacks on CI/KR could significantly disrupt the functioning of government and business alike and produce cascading effects far beyond the targeted sector and physical location of the incident. Direct terrorist attacks and natural,

  10. Waters LANL Protects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waters LANL Protects Waters LANL Protects LANL watersheds source in the Jemez Mountains and end at the Rio Grande.

  11. Protections = Defenses in Depth

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protections: Cleanup Cleanup 101 Corrective Measures Process Protection 1: Remove the Source Example Cleanup: Removal of Polychlorinated Biphenyls from Hillside 140 Environmental ...

  12. Model Fire Protection Program

    Broader source: Energy.gov [DOE]

    This program demonstrates acceptable methods and examples to assist each DOE site in meeting the fire protection objectives provided in DOE Order 5480.7A, "Fire Protection."

  13. ORISE: Protecting Human Subjects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protecting Human Subjects Protecting Human Subjects The U.S. Department of Energy (DOE) Human Subjects Research Program exists to ensure that all research conducted at DOE ...

  14. Fire Protection Program

    Broader source: Energy.gov [DOE]

    Department of Energy (DOE) Fire Protection Program provides published fire safety directives (orders, standards, and guidance documents), a range of oversight activities, an annual fire protection program summary.

  15. Theoretical Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP Theoretical Physics Understanding discoveries at the Energy, Intensity, and Cosmic Frontiers Get Expertise Rajan Gupta (505) 667-7664 Email Bruce Carlsten (505) 667-5657 Email HEP Theory at Los Alamos The Theoretical High Energy Physics group at Los Alamos National Laboratory is active in a number of diverse areas of research. Their primary areas of interest are in physics beyond the Standard Model, cosmology, dark matter, lattice quantum chromodynamics, neutrinos, the fundamentals of

  16. Nuclear Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Physics Nuclear Physics Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy security. Isotopes» A roadmap of matter that will help unlock the secrets of how the universe is put together The DOE Office of Science's Nuclear Physics (NP) program supports the experimental and theoretical research needed to create this roadmap. This quest requires a broad approach to different, but related, scientific

  17. Planetary Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    planetary physics Planetary Physics Some of the most intriguing NIF experiments test the physics believed to determine the structures of planets down to their cores, both in our solar system and beyond. In particular, scientists are using NIF to "explore" recently discovered exoplanets by duplicating the extreme conditions thought to exist in their interiors. Hundreds of extrasolar planets have been identified, some smaller than Earth and others a dozen times more massive than Jupiter.

  18. Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plasma physics Plasma Physics Almost all of the observable matter in the universe is in the plasma state. Formed at high temperatures, plasmas consist of freely moving ions and free electrons. They are often called the "fourth state of matter" because their unique physical properties distinguish them from solids, liquids and gases. Plasma densities and temperatures vary widely, from the cold gases of interstellar space to the extraordinarily hot, dense cores of stars and inside a

  19. physical security

    National Nuclear Security Administration (NNSA)

    5%2A en Physical Security Systems http:nnsa.energy.govaboutusourprogramsnuclearsecurityphysicalsecuritysystems

  20. Physical Sciences

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and the universe around us. Physics Division researchers are studying these interactions from the outermost reaches of the cosmos, to the innermost confines of subatomic particles....

  1. Voluntary Protection Program | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Voluntary Protection Program

  2. Parker, J.L. 98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL...

    Office of Scientific and Technical Information (OSTI)

    for plutonium and americium-241 decay corrections Sampson, T.E.; Parker, J.L. 98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL PROTECTION; AMERICIUM 241; DECAY; PLUTONIUM;...

  3. Rocky Mountain Electrical League (RMEL) Physical and Cyber Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrations, led by the Western Area Power Marketing Administration, to develop a fiscally responsible and effective protection strategy for physical attacks on the grid. ...

  4. Physical Scientist

    Broader source: Energy.gov [DOE]

    The Office of Science is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for this vital area of...

  5. Subatomic Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Subatomic Physics We play a major role in large-scale scientific collaborations around the world, performing nuclear physics experiments that advance the understanding of the hidden subatomic reactions of the universe and how high explosives affect matter. Contact Us Group Leader Melynda Brooks Email Deputy Group Leader Frans Trouw Email Group Office (505) 667-6941 A detector that uses muons, tiny particles generated when cosmic rays interact with Earth's atmosphere to look inside the cores of

  6. Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Plasma Physics By leveraging plasma under extreme conditions, we concentrate on solving critical scientific challenges such as detecting smuggled nuclear materials, advancing weapons physics and generating fusion energy. Contact Us Group Leader Ray Leeper Email Deputy Group Leader Julie Canepa Email Group Office (505) 665-9145 Laser-generated neutrons Researchers at Los Alamos have successfully demonstrated for the first time that laser-generated neutrons can be enlisted as a useful tool in

  7. Voluntary Protection Program Announcement

    Broader source: Energy.gov [DOE]

    Secretary O'Leary formally announced a new initiative, "The Department of Energy Voluntary Protection Program (DOEVPP)," which is designed to recognize contractor sites that are providing excellent safety and health protection to their employees.

  8. Protective Force Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-30

    Provides detailed requirements to supplement DOE O 473.2, Protective Force Program, which establishes the requirements and responsibilities for management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Does not cancel other directives.

  9. Fire Protection Program Metrics

    Broader source: Energy.gov [DOE]

    Presenter: Perry E. D ’Antonio, P.E., Acting Sr. Manager, Fire Protection - Sandia National Laboratories

  10. Model Fire Protection Program

    Broader source: Energy.gov [DOE]

    To facilitate conformance with its fire safety directives and the implementation of a comprehensive fire protection program, DOE has developed a number of "model" program documents. These include a comprehensive model fire protection program, model fire hazards analyses and assessments, fire protection system inspection and testing procedures, and related material.

  11. Corium protection assembly

    DOE Patents [OSTI]

    Gou, Perng-Fei; Townsend, Harold E.; Barbanti, Giancarlo

    1994-01-01

    A corium protection assembly includes a perforated base grid disposed below a pressure vessel containing a nuclear reactor core and spaced vertically above a containment vessel floor to define a sump therebetween. A plurality of layers of protective blocks are disposed on the grid for protecting the containment vessel floor from the corium.

  12. Fire Protection Program Manual

    SciTech Connect (OSTI)

    Sharry, J A

    2012-05-18

    This manual documents the Lawrence Livermore National Laboratory (LLNL) Fire Protection Program. Department of Energy (DOE) Orders 420.1B, Facility Safety, requires LLNL to have a comprehensive and effective fire protection program that protects LLNL personnel and property, the public and the environment. The manual provides LLNL and its facilities with general information and guidance for meeting DOE 420.1B requirements. The recommended readers for this manual are: fire protection officers, fire protection engineers, fire fighters, facility managers, directorage assurance managers, facility coordinators, and ES and H team members.

  13. Physical Security

    SciTech Connect (OSTI)

    2008-01-01

    The future of physical security at government facilities and national laboratories is rapidly progressing beyond the cliché of gates, guns and guards, and is quickly being replaced by radars, sensors and cameras. Learn more about INL's security research at http://www.facebook.com/idahonationallaboratory.

  14. High Energy Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High Energy Physics High Energy Physics Investigating the field of high energy physics ... Through the Office of High Energy Physics (HEP), Los Alamos conducts research in particle ...

  15. Ground Water Protection Programs Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-05

    This Guide provides a description of the elements of an integrated site-wide ground water protection program that can be adapted to unique physical conditions and programmatic needs at each DOE site. Canceled by DOE N 251.82.

  16. Notice of Intent to Revise DOE O 473.3, Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-07-17

    The purpose of the revision is to implement 10 Code of Federal Regulations Part 1046, Medical, Physical Readiness, Training, and Access Authorization Standards for Protective Force Personnel.

  17. Respiratory Protection Program

    Broader source: Energy.gov [DOE]

    This page is supported by the Respiratory Protection Program Administrators Group. The Respiratory Protection Program Administrators Group is a volunteer organization co-sponsored by the DOE Office of Worker Safety and Health Policy and the Energy Facility Contractors Group (EFCOG) to provide a forum for DOE and DOE contractor personnel to identify respiratory protection issues of concern to the DOE and pursue solutions to issues identified.

  18. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  19. ORISE: Human Subjects Protection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human Subjects Protection The Oak Ridge Institute for Science and Education (ORISE) ... U.S. Department of Energy (DOE) laboratories involved in human subjects research projects. ...

  20. Asset Protection Analysis Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-21

    The Guide provides examples of the application of as set protection analysis to several common problems. Canceled by DOE N 251.80.

  1. Environmental Protection: Controlling the Present

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection community-environmentassetsimagesiconearthday.jpg Environmental Protection: Controlling the Present The Laboratory is committed to increasing sustainable practices...

  2. Hadron physics

    SciTech Connect (OSTI)

    Bunce, G.

    1984-05-30

    Is all hadronic physics ultimately describable by QCD. Certainly, many disparate phenomena can be understood within the QCD framework. Also certainly, there are important questions which are open, both theoretically (little guidance, as yet) and experimentally, regarding confinement. Are there dibaryons, baryonium, glueballs. In addition, there are experimental results which at present do not have an explanation. This talk, after a short section on QCD successes and difficulties, will emphasize two experimental topics which have recent results - glueball spectroscopy and exclusive reactions at large momentum transfer. Both are experimentally accessible in the AGS/LAMPF II/AGS II/TRIUMF II/SIN II energy domain.

  3. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  4. Protection of Human Subjects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-12-20

    The order establishes Department of Energy (DOE) procedures and responsibilities for implementing the policy and requirements set forth in 10 Code of Federal Regulations (CFR) Part 745, Protection of Human Subjects; and in DOE P 443.1A, Protection of Human Subjects, dated 12-20-07. Cancels DOE O 443.1. Canceled by DOE O 443.1B.

  5. Protection of Human Subjects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-05-15

    To establish DOE procedures and responsibilities for implementing the policy and requirements set forth in 10 CFR Part 745, Protection of Human Subjects, ad in DOE P 443.1, Policy on the Protection of Human Subjects. Cancels DOE O 1300.3. Canceled by DOE O 443.1A.

  6. Protective Force Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-12-20

    Provides detailed requirements to supplement DOE O 473.2, PROTECTIVE FORCE PROGRAM, which establishes the requirements and responsibilities for management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Change 1 revised pages in Chapters IV and VI on 12/20/2001.

  7. Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-01-15

    To implement sound stewardship practices that are protective of the air, water, land, and other natural and cultural resources impacted by the Department of Energy (DOE) operations and by which DOE cost effectively meets or exceeds compliance with applicable environmental; public health; and resource protection laws, regulations, and DOE requirements. Cancels DOE 5400.1 and DOE N 450.4.

  8. Assessment of methods for evaluating adequacy of physical protection systems

    SciTech Connect (OSTI)

    Chapman, L.D.

    1980-01-01

    Generally, the scope of a safeguards evaluation model can efficiently address one of two issues: (1) global safeguards effectiveness or (2) vulnerability analysis for individual scenarios. A brief description of the variety of models developed in these areas is discussed. Current generation models are described along with an assessment of their utility and a brief look at future techniques for evaluation will be noted.

  9. Physics Division News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PADSTE » ADEPS » Physics » Physics Division News Physics Division News Discover more about the wide-ranging scope of Physics Division science and technology. Contact Us ADEPS Communications Email Physics Flash An electronic newsletter featuring interviews with Physics Division staff and news of awards and the latest research published in peer-reviewed journals. Physics Flash archive Focus on Physics Focus on Proton Radiography (pdf) High Energy Physics: LBNE, HAWC (pdf) Nuclear Physics:

  10. CRAD, Feedback and Continuous Improvement - DOE Headquarters...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feedback and Continuous Improvement Inspection Criteria and Approach - DOE ... Department of Energy Oversight Policy; DOE Order 226. 1A, Implementation of Department of Energy ...