Sample records for halide replacing hid

  1. Emission and spectral characteristics of electrodeless indium halide lamp

    SciTech Connect (OSTI)

    Takeda, M.; Hochi, A.; Horii, S.; Matsuoka, T. [Matsushita Electric Industrial Co., Ltd., Kyoto (Japan). Lighting Research Lab.

    1997-12-31T23:59:59.000Z

    The electrodeless HID lamp excited by microwave has been intensively investigated because of its long life, high efficacy and environmental aspect. This study reports excellent emission and spectral characteristics of electrodeless HID lamp containing indium halides. The authors investigate InI and InBr as ingredients, and measure the microwave excited spectra and luminous intensities of lamps which are made from spherical silica glass in 10--40 mm outer diameter and with various amounts of halides. It is well known that such indium halides in the usual metal-halide lamps have strong blue line emission at 410 and 451nm. But, in the authors` microwave excited lamps, continuous spectrum can be observed in addition in the visible region. Increasing input of power of microwave makes this continuous spectrum stronger. Below 1kW microwave input power, the spectrum of InBr lamp almost resembled the CIE standard illuminant D65. As a consequence of the spectrum, they found that the color rendering and the duv of InBr lamp were excellent as high as 95 and smaller than 0.002, respectively, in the region of 400--800W input power. The efficacy higher than 100 lm/W was further achieved at 400W. The authors confirm that the microwave excited indium halides lamps can be applicable to many fields of lighting.

  2. Study of high frequency & low frequency electronic ballasts for HID lamps

    E-Print Network [OSTI]

    Peng, Hua

    1997-01-01T23:59:59.000Z

    High-intensity discharge (HID) lamp electronic ballasting is receiving increasing attention in the recent years as low wattage HID lighting systems are finding indoor applications. Advantages of high frequency electronic ballast for HID lamps...

  3. Lutetium gadolinium halide scintillators

    SciTech Connect (OSTI)

    Shah, Kanai S. (Newton, MA); Higgins, William M (Westborough, MA); Van Loef, Edgar V (Allston, MA); Glodo, Jaroslaw (Allston, MA)

    2010-07-13T23:59:59.000Z

    Lutetium gadolinium halide scintillators, devices and methods, including a composition having the formula Lu.sub.xGd.sub.(1-x)Halide and a dopant.

  4. T-547: Microsoft Windows Human Interface Device (HID) Vulnerability

    Broader source: Energy.gov [DOE]

    Microsoft Windows does not properly warn the user before enabling additional Human Interface Device (HID) functionality over USB, which allows user-assisted attackers to execute arbitrary programs via crafted USB data, as demonstrated by keyboard and mouse data sent by malware on a Smartphone that the user connected to the computer.

  5. Electrodeless HID lamp study. Final report. [High intensity discharge

    SciTech Connect (OSTI)

    Anderson, J.M.; Johnson, P.D.; Jones, C.E.; Rautenberg, T.H.

    1985-01-01T23:59:59.000Z

    High intensity discharge lamps excited by solenoidal electric fields (SEF/HID) were examined for their ability to give high brightness, high efficacy and good color. Frequency of operation was 13.56 MHz (ISM Band) and power to the lamp plasma ranged from about 400 to 1000 W. Radio frequency transformers with air cores and with air core complemented by ferrite material in the magnetic path were used to provide the voltage for excitation. Electrical properties of the matching network and the lamp plasma were measured or calculated and total light from the lamp was measured by an integrating sphere. Efficacies calculated from measurement were found to agree well with the positive column efficacies of conventional HID lamps containing only mercury, and with additives of sodium, thallium, and scandium iodide. Recommendations for future work are given.

  6. Actinide halide complexes

    DOE Patents [OSTI]

    Avens, Larry R. (Los Alamos, NM); Zwick, Bill D. (Santa Fe, NM); Sattelberger, Alfred P. (Los Alamos, NM); Clark, David L. (Los Alamos, NM); Watkin, John G. (Los Alamos, NM)

    1992-01-01T23:59:59.000Z

    A compound of the formula MX.sub.n L.sub.m wherein M is a metal atom selected from the group consisting of thorium, plutonium, neptunium or americium, X is a halide atom, n is an integer selected from the group of three or four, L is a coordinating ligand selected from the group consisting of aprotic Lewis bases having an oxygen-, nitrogen-, sulfur-, or phosphorus-donor, and m is an integer selected from the group of three or four for monodentate ligands or is the integer two for bidentate ligands, where the sum of n+m equals seven or eight for monodentate ligands or five or six for bidentate ligands, a compound of the formula MX.sub.n wherein M, X, and n are as previously defined, and a process of preparing such actinide metal compounds including admixing the actinide metal in an aprotic Lewis base as a coordinating solvent in the presence of a halogen-containing oxidant, are provided.

  7. Actinide halide complexes

    DOE Patents [OSTI]

    Avens, L.R.; Zwick, B.D.; Sattelberger, A.P.; Clark, D.L.; Watkin, J.G.

    1992-11-24T23:59:59.000Z

    A compound is described of the formula MX[sub n]L[sub m] wherein M is a metal atom selected from the group consisting of thorium, plutonium, neptunium or americium, X is a halide atom, n is an integer selected from the group of three or four, L is a coordinating ligand selected from the group consisting of aprotic Lewis bases having an oxygen-, nitrogen-, sulfur-, or phosphorus-donor, and m is an integer selected from the group of three or four for monodentate ligands or is the integer two for bidentate ligands, where the sum of n+m equals seven or eight for monodentate ligands or five or six for bidentate ligands. A compound of the formula MX[sub n] wherein M, X, and n are as previously defined, and a process of preparing such actinide metal compounds are described including admixing the actinide metal in an aprotic Lewis base as a coordinating solvent in the presence of a halogen-containing oxidant.

  8. Preparation of cerium halide solvate complexes

    DOE Patents [OSTI]

    Vasudevan, Kalyan V; Smith, Nickolaus A; Gordon, John C; McKigney, Edward A; Muenchaussen, Ross E

    2013-08-06T23:59:59.000Z

    Crystals of a solvated cerium(III) halide solvate complex resulted from a process of forming a paste of a cerium(III) halide in an ionic liquid, adding a solvent to the paste, removing any undissolved solid, and then cooling the liquid phase. Diffusing a solvent vapor into the liquid phase also resulted in crystals of a solvated cerium(III) halide complex.

  9. Development of Halide and Oxy-Halides for Isotopic Separations

    SciTech Connect (OSTI)

    Leigh R. Martin; Aaron T. Johnson; Jana Pfeiffer; Martha R. Finck

    2014-10-01T23:59:59.000Z

    The goal of this project was to synthesize a volatile form of Np for introduction into mass spectrometers at INL. Volatile solids of the 5f elements are typically those of the halides (e.g. UF6), however fluorine is highly corrosive to the sensitive internal components of the mass separator, and the other volatile halides exist as several different stable isotopes in nature. However, iodide is both mono-isotopic and volatile, and as such presents an avenue for creation of a form of Np suitable for introduction into the mass separator. To accomplish this goal, the technical work in the project sought to establish a novel synthetic route for the conversion NpO2+ (dissolved in nitric acid) to NpI3 and NpI4.

  10. Halide and Oxy-halide Eutectic Systems for High Performance High...

    Broader source: Energy.gov (indexed) [DOE]

    Q2 Halide and Oxy-Halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids Corrosion in Very High-Temperature Molten Salt for Next Generation CSP Systems...

  11. Diamond films treated with alkali-halides

    DOE Patents [OSTI]

    Anderson, D.F.; Kwan, S.W.

    1997-04-08T23:59:59.000Z

    A secondary electron emitter is provided and includes a substrate with a diamond film, the diamond film is treated or coated with an alkali-halide. 5 figs.

  12. Lanthanide doped strontium barium mixed halide scintillators

    SciTech Connect (OSTI)

    Gundiah, Gautam; Bizarri, Gregory; Hanrahan, Stephen M; Bourret-Courchesne, Edith; Derenzo, Stephen E

    2013-07-16T23:59:59.000Z

    The present invention provides for a composition comprising an inorganic scintillator comprising a lanthanide-doped strontium barium mixed halide useful for detecting nuclear material.

  13. anhydrous transcurium halides: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of metal halide lamps are investigated, including acoustic resonance, spectral energy, and luminous efficacy. To operate metal halide lamps at intended conditions, (more)...

  14. Enhanced Quantum Efficiency From Hybrid Cesium Halide/Copper...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quantum Efficiency From Hybrid Cesium HalideCopper Photocathode. Enhanced Quantum Efficiency From Hybrid Cesium HalideCopper Photocathode. Abstract: The quantum efficiency of Cu...

  15. Application of vane-type resonator to microwave powered electrodeless HID lamp

    SciTech Connect (OSTI)

    Hochi, Akira; Takeda, Mamoru

    1999-07-01T23:59:59.000Z

    A cavity resonator has been generally used as microwave applicator for an electrodeless high intensity discharge (HID) lamp. The size of a cavity resonator is determined by the wavelength of a microwave applied. For example, for a microwave of 2.45 GHz, an inner diameter of more than about 76 mm is necessary for obtaining a microwave resonant field, and then the size of a plasma arc capable of maintaining a stable discharge is experimentally limited at about 15 mm and above. Accordingly the microwave powered electrodeless HID lamp device using cavity resonator is inappropriate in applications where a point light source is required. A vane-type resonator is generally known as an anode of a magnetron, which decides the oscillation frequency of the magnetron. The authors used 3-D finite element method simulation for a design of a vane-type resonator with parabolic reflector to obtain a desired resonant frequency. According to the results of the simulation, the sizes of a 4-vanes resonator with the parabolic reflector were decided, and the resonator made of aluminum and copper was prepared. An electrodeless lamp with InBr and Ar gas enclosed in a spherical quartz glass tube having an inner diameter of about 4 mm was also prepared, and was set at center portion of the resonator. The total luminous flux was about 2,150 lm at microwave input of 27 W. Incidentally, the CRI and Tc for this lamp were 93 and 10,200 K, respectively. Thus, it becomes possible to efficiently couple microwave energy with a smaller-sized electrodeless HID lamp than conventional.

  16. Plasma spectroscopic study of an electrodeless HID lamp containing Tl and Zn

    SciTech Connect (OSTI)

    Takeda, Mamoru; Horii, Shigeru; Hochi, Akira [Matsushita Electric Industrial Co., Ltd., Kyoto (Japan). Lighting Research Lab.

    1996-12-31T23:59:59.000Z

    Recently the electrodeless HID lamps excited by microwaves have been studied intensively. Tl is well known as a material having strong green emission lines. In this study, Tl spectra excited by microwaves were reported in the cases of Tl only and Tl + Zn. Using the Elenbaas`s method of high pressure Hg lamp, the cause of Tl continuous spectrum was examined. From the ratio of radiative intensities of two lines, an average arc temperature in the bulb was estimated. Then excitation level of the continuous emission spectrum near the 600nm wavelength was calculated from the dependence of the radiative intensities on these arc temperatures.

  17. Halide and Oxy-Halide Eutectic Systems for High-Performance,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    computational modeling along with rapid material screening methods to identify halide salt mixtures with a melting point below 250C that are stable at temperatures well above...

  18. Oxidation of hydrogen halides to elemental halogens

    DOE Patents [OSTI]

    Rohrmann, Charles A. (Kennewick, WA); Fullam, Harold T. (Richland, WA)

    1985-01-01T23:59:59.000Z

    A process for oxidizing hydrogen halides having substantially no sulfur impurities by means of a catalytically active molten salt is disclosed. A mixture of the subject hydrogen halide and an oxygen bearing gas is contacted with a molten salt containing an oxidizing catalyst and alkali metal normal sulfates and pyrosulfates to produce an effluent gas stream rich in the elemental halogen and substantially free of sulfur oxide gases.

  19. New Energy Efficiency Standards for Metal Halide Lamp Fixtures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metal Halide Lamp Fixtures to Save on Energy Bills and Reduce Carbon Pollution New Energy Efficiency Standards for Metal Halide Lamp Fixtures to Save on Energy Bills and Reduce...

  20. Modelling Additive Transport in Metal Halide Lamps

    E-Print Network [OSTI]

    Eindhoven, Technische Universiteit

    doctor aan de Technische Universiteit Eindhoven, op gezag van de Rector Magnificus, prof.dr.ir. C.J. van-DATA LIBRARY TECHNISCHE UNIVERSITEIT EINDHOVEN Beks, Mark Louwrens Modelling Additive Transport in Metal Halide Lamps/ door Beks, M.L. - Eindhoven : Technische Universiteit Eindhoven, 2008. Proefschrift. ISBN: 978

  1. Process and composition for drying of gaseous hydrogen halides

    DOE Patents [OSTI]

    Tom, Glenn M. (New Milford, CT); Brown, Duncan W. (Wilton, CT)

    1989-08-01T23:59:59.000Z

    A process for drying a gaseous hydrogen halide of the formula HX, wherein X is selected from the group consisting of bromine, chlorine, fluorine, and iodine, to remove water impurity therefrom, comprising: contacting the water impurity-containing gaseous hydrogen halide with a scavenger including a support having associated therewith one or more members of the group consisting of: (a) an active scavenging moiety selected from one or more members of the group consisting of: (i) metal halide compounds dispersed in the support, of the formula MX.sub.y ; and (ii) metal halide pendant functional groups of the formula -MX.sub.y-1 covalently bonded to the support, wherein M is a y-valent metal, and y is an integer whose value is from 1 to 3; (b) corresponding partially or fully alkylated compounds and/or pendant functional groups, of the metal halide compounds and/or pendant functional groups of (a); wherein the alkylated compounds and/or pendant functional groups, when present, are reactive with the gaseous hydrogen halide to form the corresponding halide compounds and/or pendant functional groups of (a); and M being selected such that the heat of formation, .DELTA.H.sub.f of its hydrated halide, MX.sub.y.(H.sub.2 O).sub.n, is governed by the relationship: .DELTA.H.sub.f .gtoreq.n.times.10.1 kilocalories/mole of such hydrated halide compound wherein n is the number of water molecules bound to the metal halide in the metal halide hydrate. Also disclosed is an appertaining scavenger composition and a contacting apparatus wherein the scavenger is deployed in a bed for contacting with the water impurity-containing gaseous hydrogen halide.

  2. Halide electroadsorption on single crystal surfaces

    SciTech Connect (OSTI)

    Ocko, B.M. [Brookhaven National Lab., Upton, NY (United States). Dept. of Physics; Wandlowski, T. [Univ. of Ulm (Germany). Dept. of Electrochemistry

    1997-07-01T23:59:59.000Z

    The structure and phase behavior of halides have been investigated on single crystals of Ag and Au using synchrotron x-ray scattering techniques. The adlayer coverages are potential dependent. For all halides studied the authors found that with increasing potential, at a critical potential, a disordered adlayer transforms into an ordered structure. Often these ordered phases are incommensurate and exhibit potential-dependent lateral separations (electrocompression). The authors have analyzed the electrocompression in terms of a model which includes lateral interactions and partial charge. A continuous compression is not observed for Br on Ag(100). Rather, they find that the adsorption is site-specific (lattice gas) in both the ordered and disordered phases. The coverage increases with increasing potential and at a critical potential the disordered phase transforms to a well-ordered commensurate structure.

  3. Lanthanide-halide based humidity indicators

    DOE Patents [OSTI]

    Beitz, James V. (Hinsdale, IL); Williams, Clayton W. (Chicago, IL)

    2008-01-01T23:59:59.000Z

    The present invention discloses a lanthanide-halide based humidity indicator and method of producing such indicator. The color of the present invention indicates the humidity of an atmosphere to which it is exposed. For example, impregnating an adsorbent support such as silica gel with an aqueous solution of the europium-containing reagent solution described herein, and dehydrating the support to dryness forms a substance with a yellow color. When this substance is exposed to a humid atmosphere the water vapor from the air is adsorbed into the coating on the pore surface of the silica gel. As the water content of the coating increases, the visual color of the coated silica gel changes from yellow to white. The color change is due to the water combining with the lanthanide-halide complex on the pores of the gel.

  4. americium halides: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or nickel-catalyzed cross-coupling reactions using unactivated alkyl electrophiles (e.g., halides and sulfonates). Although aryl and alkenyl ... Zhou, Jianrong (Jianrong Steve)...

  5. IEEE Power Electronics Specialists Conference, PESC-97, 39-45, St. Louis, 1997. A MHz Electronic Ballast for Automotive-Type HID Lamps

    E-Print Network [OSTI]

    Ballast for Automotive-Type HID Lamps Michael Gulko and Sam Ben-Yaakov* Power Electronics Laboratory lamps designated for automotive headlight applications was investigated theoretically, by simulation and experimentally. The study reveals that a based ballast (CS-PPRI) complies with the automotive requirement of very

  6. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

  7. Magnetic polarizations of electrons at dislocations in alkali halides

    E-Print Network [OSTI]

    McClurg, Gene Roark

    1969-01-01T23:59:59.000Z

    interval. 25 NAGNETIC POLARIZATIONS OF ELECTRONS AT DISLOCATIONS IN ALKALI HALIDES 1. INTRODUCTION. The new magnetic effects observed in our laboratory on a number of single crystals of alkali halides are thought to be caused by electrons trapped... on d1slocations. The magnet1c properties are perhaps more interesting as a bas1c contribution to the sc1ence of magnetism than to a knowledge of d. islocations 1n these very pure, optically clear, s1ngle crystals of alkal1 halides. The gross magnet...

  8. Metal-halide perovskites for photovoltaic and light-emitting...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Metal-halide perovskites for photovoltaic and light-emitting devices September 15, 2015 at 4:30 pm36-428 Sam Stranks Massachusetts Institute of Technology peopleStranks...

  9. Cross-coupling reactions of unactivated alkyl halides

    E-Print Network [OSTI]

    Zhou, Jianrong (Jianrong Steve)

    2005-01-01T23:59:59.000Z

    My graduate research at MIT has been focused on the development of palladium- or nickel-catalyzed cross-coupling reactions using unactivated alkyl electrophiles (e.g., halides and sulfonates). Although aryl and alkenyl ...

  10. Reactions of nitrogen heterocycle-organolithium intermediates with lead halides

    E-Print Network [OSTI]

    Kinney, Jerry Neal

    1970-01-01T23:59:59.000Z

    REACTIONS OF NITROGEN HETEROCYCLE- ORGANOLITHIUM INTERMEDIATES WITH LEAD HALIDES A Thesis by JERRY HEAL KINNEY Submitted to the Graduate College of Texas ALM University In partial fulfillment of the requirement for the degree ot MASTER...) (Mem er) December 1970 ABSTRACT Reactions of Nitrogen Heterocycle-Organollthium intermediates With Lead Halides. (December l970) Jerry Neal Kinney, B. S. , Texas AE, M University Directed by: Dr. Choo-Seng Giam Reactions of nitrogen heterocycle...

  11. Process for oxidation of hydrogen halides to elemental halogens

    DOE Patents [OSTI]

    Lyke, Stephen E. (Middleton, WI)

    1992-01-01T23:59:59.000Z

    An improved process for generating an elemental halogen selected from chlorine, bromine or iodine, from a corresponding hydrogen halide by absorbing a molten salt mixture, which includes sulfur, alkali metals and oxygen with a sulfur to metal molar ratio between 0.9 and 1.1 and includes a dissolved oxygen compound capable of reacting with hydrogen halide to produce elemental halogen, into a porous, relatively inert substrate to produce a substrate-supported salt mixture. Thereafter, the substrate-supported salt mixture is contacted (stage 1) with a hydrogen halide while maintaining the substrate-supported salt mixture during the contacting at an elevated temperature sufficient to sustain a reaction between the oxygen compound and the hydrogen halide to produce a gaseous elemental halogen product. This is followed by purging the substrate-supported salt mixture with steam (stage 2) thereby recovering any unreacted hydrogen halide and additional elemental halogen for recycle to stage 1. The dissolved oxygen compound is regenerated in a high temperature (stage 3) and an optical intermediate temperature stage (stage 4) by contacting the substrate-supported salt mixture with a gas containing oxygen whereby the dissolved oxygen compound in the substrate-supported salt mixture is regenerated by being oxidized to a higher valence state.

  12. Vitrification of IFR and MSBR halide salt reprocessing wastes

    SciTech Connect (OSTI)

    Siemer, D.D. [Idaho National Laboratory, 12N 3167E, Idaho Falls, ID 83402 (United States)

    2013-07-01T23:59:59.000Z

    Both of the genuinely sustainable (breeder) nuclear fuel cycles (IFR - Integral Fast Reactor - and MSBR - Molten Salt Breeder Reactor -) studied by the USA's national laboratories would generate high level reprocessing waste (HLRW) streams consisting of a relatively small amount ( about 4 mole %) of fission product halide (chloride or fluoride) salts in a matrix comprised primarily (about 95 mole %) of non radioactive alkali metal halide salts. Because leach resistant glasses cannot accommodate much of any of the halides, most of the treatment scenarios previously envisioned for such HLRW have assumed a monolithic waste form comprised of a synthetic analog of an insoluble crystalline halide mineral. In practice, this translates to making a 'substituted' sodalite ('Ceramic Waste Form') of the IFR's chloride salt-based wastes and fluoroapatite of the MSBR's fluoride salt-based wastes. This paper discusses my experimental studies of an alternative waste management scenario for both fuel cycles that would separate/recycle the waste's halide and immobilize everything else in iron phosphate (Fe-P) glass. It will describe both how the work was done and what its results indicate about how a treatment process for both of those wastes should be implemented (fluoride and chloride behave differently). In either case, this scenario's primary advantages include much higher waste loadings, much lower overall cost, and the generation of a product (glass) that is more consistent with current waste management practices. (author)

  13. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  14. First SNS Target Replacement

    E-Print Network [OSTI]

    McDonald, Kirk

    First SNS Target Replacement Experience M. Dayton, M. Rennich, Van Graves, J. DeVore Presented by T.S. Department of Energy AHIP Workshop Oct. 2009 Overview · Initial Target Replacement · Target Maintenance-Battelle for the U.S. Department of Energy AHIP Workshop Oct. 2009 First SNS Target Replacement · Replacement

  15. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  16. Analyzing Replacement Stock Alternatives

    E-Print Network [OSTI]

    Falconer, Lawrence; McGrann, James M.; Parker, John; Jones, Rodney

    2008-10-21T23:59:59.000Z

    Replacement management strategy involves comparing the values of the breeding stock you own with the value of potential replacements, and then choosing the investment with the highest expected worth. This publication discusses the application...

  17. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01T23:59:59.000Z

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  18. Impact of the organic halide salt on final perovskite composition for photovoltaic applications

    SciTech Connect (OSTI)

    Moore, David T.; Sai, Hiroaki; Wee Tan, Kwan; Estroff, Lara A.; Wiesner, Ulrich, E-mail: ubw1@cornell.edu [Department of Materials Science and Engineering, Cornell University, Ithaca, New York 14853 (United States)

    2014-08-01T23:59:59.000Z

    The methylammonium lead halide perovskites have shown significant promise as a low-cost, second generation, photovoltaic material. Despite recent advances, however, there are still a number of fundamental aspects of their formation as well as their physical and electronic behavior that are not well understood. In this letter we explore the mechanism by which these materials crystallize by testing the outcome of each of the reagent halide salts. We find that components of both salts, lead halide and methylammonium halide, are relatively mobile and can be readily exchanged during the crystallization process when the reaction is carried out in solution or in the solid state. We exploit this fact by showing that the perovskite structure is formed even when the lead salt's anion is a non-halide, leading to lower annealing temperature and time requirements for film formation. Studies into these behaviors may ultimately lead to improved processing conditions for photovoltaic films.

  19. Diploma Replacement Order diploma-replace 1/12

    E-Print Network [OSTI]

    Shamos, Michael I.

    Diploma Replacement Order diploma-replace 1/12 A replacement diploma may be ordered in the event of loss of or damage to the original diploma. Replacement diplomas are 17Ă? 14 ("mini" diplomas or letter-sized diplomas are no longer available). The replacement diploma fee is $50, payable by check or credit card

  20. Video face replacement

    E-Print Network [OSTI]

    Dale, Kevin

    We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

  1. Oxide Film Aging on Alloy 22 in Halide Containing Solutions

    SciTech Connect (OSTI)

    Rodriguez, Martin A.; Carranza, Ricardo M. [Dept. Materiales, Comision Nacional de Energia Atomica, Av. Gral. Paz 1499, Villa Maipu, 1650 (Argentina); Rebak, Raul B. [Lawrence Livermore National Laboratory, 7000 East Ave, L-631, Livermore, CA, 94550-9698 (United States)

    2007-07-01T23:59:59.000Z

    Passive and corrosion behaviors of Alloy 22 in chloride and fluoride containing solutions, changing the heat treatment of the alloy, the halide concentration and the pH of the solutions at 90 deg. C, was investigated. The study was implemented using electrochemical techniques, which included open circuit potential monitoring over time, potentiodynamic polarization and electrochemical impedance spectroscopy (EIS) measurements carried out at open circuit and at passivity potentials. Corrosion rates obtained by EIS measurements after 24 h immersion in naturally aerated solutions were below 0.5 {mu}m/year. The corrosion rates were practically independent of solution pH, alloy heat treatment and halide ion nature and concentration. EIS low frequency resistance values increased with applied potential in the passive domain and with polarization time in pH 6 - 1 M NaCl at 90 deg. C. This effect was attributed to an increase in the oxide film thickness and oxide film aging. High frequency capacitance measurements indicated that passive oxide on Alloy 22 presented a double n-type/p-type semiconductor behavior in the passive potential range. (authors)

  2. A new polarizable force field for alkali and halide ions

    SciTech Connect (OSTI)

    Kiss, Péter T.; Baranyai, András [Institute of Chemistry, Eötvös University, 1518 Budapest 112, PO BOX 32 (Hungary)

    2014-09-21T23:59:59.000Z

    We developed transferable potentials for alkali and halide ions which are consistent with our recent model of water [P. T. Kiss and A. Baranyai, J. Chem. Phys. 138, 204507 (2013)]. Following the approach used for the water potential, we applied Gaussian charge distributions, exponential repulsion, and r{sup ?6} attraction. One of the two charges of the ions is fixed to the center of the particle, while the other is connected to this charge by a harmonic spring to express polarization. Polarizability is taken from quantum chemical calculations. The repulsion between different species is expressed by the combining rule of Kong [J. Chem. Phys. 59, 2464 (1972)]. Our primary target was the hydration free energy of ions which is correct within the error of calculations. We calculated water-ion clusters up to 6 water molecules, and, as a crosscheck, we determined the density and internal energy of alkali-halide crystals at ambient conditions with acceptable accuracy. The structure of hydrated ions was also discussed.

  3. REQUEST FOR REPLACEMENT DIPLOMA Name: ________________________________________________________________________

    E-Print Network [OSTI]

    Gering, Jon C.

    REQUEST FOR REPLACEMENT DIPLOMA Name. ________________________________________________________________________ First Middle Maiden Last REPLACEMENT DIPLOMA INFORMATION Please print your name exactly as you want it to appear on your replacement diploma. If your name has changed since your degree was awarded, and if you

  4. Methods for synthesizing alane without the formation of adducts and free of halides

    SciTech Connect (OSTI)

    Zidan, Ragaiy; Knight, Douglas A; Dinh, Long V

    2013-02-19T23:59:59.000Z

    A process is provided to synthesize an alane without the formation of alane adducts as a precursor. The resulting product is a crystallized .alpha.-alane and is a highly stable product and is free of halides.

  5. A Solid-State 199Hg NMR Study of Mercury Halides

    E-Print Network [OSTI]

    Taylor, Robert E; Bai, Shi; Dybowski, Cecil

    2011-01-01T23:59:59.000Z

    550 (1998), 89-99. [25] R. E. Taylor, C. T. Carver, R. E.7 (1997), 333-336. [33] R. E. Taylor, Concepts Magn. Reson.Study of Mercury Halides R. E. Taylor 1 *, Shi Bai 2 , and

  6. Negishi Coupling of Secondary Alkylzinc Halides with Aryl Bromides and Chlorides

    E-Print Network [OSTI]

    Han, Chong

    An efficient palladium-catalyzed process has been developed for Negishi coupling of secondary alkylzinc halides with a wide range of aryl bromides and activated aryl chlorides. A palladium catalyst composed of a new ...

  7. Amino Alcohols as Ligands for Nickel-Catalyzed Suzuki Reactions of Unactivated Alkyl Halides, Including Secondary Alkyl Chlorides, with

    E-Print Network [OSTI]

    Fu, Gregory C.

    Amino Alcohols as Ligands for Nickel-Catalyzed Suzuki Reactions of Unactivated Alkyl Halides February 27, 2006; E-mail: gcf@mit.edu Early work in the area of palladium- and nickel-catalyzed cross of unactivated secondary alkyl halides is based on nickel/bathophenanthroline.4 This method can be applied

  8. Solid-State NMR/NQR and First-Principles Study of Two Niobium Halide Cluster Compounds

    E-Print Network [OSTI]

    Boyer, Edmond

    1 Solid-State NMR/NQR and First-Principles Study of Two Niobium Halide Cluster Compounds Berislav : 10.1016/j.ssnmr.2014.02.001 #12;2 Abstract Two hexanuclear niobium halide cluster compounds solid-state NMR/NQR techniques and PAW/GIPAW calculations. For niobium sites the NMR parameters were

  9. Enzyme replacement therapy for Pompe disease

    E-Print Network [OSTI]

    Burris, Ryan Jonathan William

    2010-01-01T23:59:59.000Z

    CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy for Pompe3 1.3 Enzyme Replacement Therapy for Pompe Disease…………………… 5Receptor ERT – Enzyme Replacement Therapy LSD – Lysosomal

  10. A mechanistic study of aryl halide reactions with lithium aluminum hydride 

    E-Print Network [OSTI]

    Chung, Fu-Fan

    1980-01-01T23:59:59.000Z

    A M:"CHA~JISTIC STUDv OF ARYL HALID RHAC IC~JS ' ITH LITHIUM ALUM 'J"M HYDRIDE A Thesis FU-FAJJ CHUI'JG Submitted to the Graduate College of Texas ARM University in nartial fulfillment of the reauirement for the degree of MASTER OF SCI- JC... August Jo80 Major Subject: Chemistry A MECHANISTIC STUDY OF ARYL HALIDE REACTIONS 1'IITH LITHIUM ALUMINUM HYDRIDE A Thesis by FU-FAN CHUNG Approved as to style and content by; (Chairman of Co ittee) (Member) , . 7 1 (Member) (Member) i (Head...

  11. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Energy Savers [EERE]

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  12. 5/23/13 EBSCOhost ehis.ebscohost.com.libproxy.mit.edu/ehost/delivery?sid=24f6d6e6-10b5-495d-90c9-221fc19a83fe%40sessionmgr114&vid=5&hid=107 1/2

    E-Print Network [OSTI]

    Deutch, John

    technological applications. Secretary of Energy James Watkins has argued that "it takes vision and courage-221fc19a83fe%40sessionmgr114&vid=5&hid=107 1/2 Database: Section: Record: 1 A supercollision of interests. By: Deutch, John M. Technology Review (00401692). Nov/Dec92, Vol. 95 Issue 8, p66. 1p. 1 Black

  13. Transport phenomena in metal-halide lamps a poly-diagnostic study

    E-Print Network [OSTI]

    Eindhoven, Technische Universiteit

    UNIVERSITEIT EINDHOVEN Nimalasuriya, Tanya Transport phenomena in metal-halide lamps : a poly-diagnostic study / by Tanya Nimalasuriya. - Eindhoven : Technische Universiteit Eindhoven, 2007. Proefschrift. ISBN 978 aan de Technische Universiteit Eindhoven, op gezag van de Rector Magnificus, prof.dr.ir. C.J. van

  14. Combined Cryo and Room-Temperature Ball Milling to Produce Ultrafine Halide Crystallites

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    Combined Cryo and Room-Temperature Ball Milling to Produce Ultrafine Halide Crystallites AKASH milling at cryogenic temperature as well as room temperature (RT) has been carried out to prepare out in a high-energy ball mill, and it involves repeated deformation, cold-welding, fractur- ing

  15. COLOUR CENTRES IN DOPED ALKALI HALIDES. THE ROLE OF OXYGEN AND TITANIUM

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    COLOUR CENTRES IN DOPED ALKALI HALIDES. THE ROLE OF OXYGEN AND TITANIUM IN THE LUMINESCENCE OF Li that the luminescence occurs by hole capture at a titanium defect site. However electron spin resonance has shown that the titanium is incorporated in the crystal as Ti3+ and Ti4+ ions with the possibility of charge compensa- tion

  16. alkali halide-alkaline earth: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    alkali halide-alkaline earth First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Long range interactions...

  17. Virent is Replacing Crude Oil

    Broader source: Energy.gov [DOE]

    Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

  18. Buying Vs. Raising Replacement Heifers

    E-Print Network [OSTI]

    Cleere, Jason

    2006-01-02T23:59:59.000Z

    When deciding on the best strategy for replacing heifers, beef cattle producers should weigh several factors. This publication discusses several such issues, including current and future market prices; herd size; pastures, facilities and management...

  19. High Photoluminescence E?ciency and Optically Pumped Lasing in Solution-Processed Mixed Halide Perovskite Semiconductors

    E-Print Network [OSTI]

    Deschler, Felix; Price, Michael; Pathak, Sandeep; Klintberg, Lina E.; Jarausch, David-Dominik; Higler, Ruben; Hu?ttner, Sven; Leijtens, Tomas; Stranks, Samuel D.; Snaith, Henry J.; Atatu?re, Mete; Phillips, Richard T.; Friend, Richard H.

    2014-03-24T23:59:59.000Z

    The study of the photo-physical properties of organic-metallic lead-halide perovskites, which demonstrate excellent photovoltaic performance in devices with electron- and hole-accepting layers, helps to understand their charge photo...

  20. Anytime Replanning Using Local Subplan Replacement

    E-Print Network [OSTI]

    Ferrer, Gabriel J.

    Anytime Replanning Using Local Subplan Replacement A Dissertation Presented to the faculty how local subplan replacement can be utilized to implement an anytime planning system that devises new plans to accommodate plan failures. Local subplan replacement consists of selecting subsequences

  1. Do You Have Windows That Need Replacing?

    Broader source: Energy.gov [DOE]

    Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows?

  2. Fabrication of large-volume, low-cost ceramic lanthanum halide scintillators for gamma ray detection : final report for DHS/DNDO/TRDD project TA-01-SL01.

    SciTech Connect (OSTI)

    Boyle, Timothy J.; Ottley, Leigh Anna M.; Yang, Pin; Chen, Ching-Fong; Sanchez, Margaret R.; Bell, Nelson Simmons

    2008-10-01T23:59:59.000Z

    This project uses advanced ceramic processes to fabricate large, optical-quality, polycrystalline lanthanum halide scintillators to replace small single crystals produced by the conventional Bridgman growth method. The new approach not only removes the size constraint imposed by the growth method, but also offers the potential advantages of both reducing manufacturing cost and increasing production rate. The project goal is to fabricate dense lanthanum halide ceramics with a preferred crystal orientation by applying texture engineering and solid-state conversion to reduce the thermal mechanical stress in the ceramic and minimize scintillation light scattering at grain boundaries. Ultimately, this method could deliver the sought-after high sensitivity and <3% energy resolution at 662 keV of lanthanum halide scintillators and unleash their full potential for advanced gamma ray detection, enabling rapid identification of radioactive materials in a variety of practical applications. This report documents processing details from powder synthesis, seed particle growth, to final densification and texture development of cerium doped lanthanum bromide (LaBr{sub 3}:Ce{sup +3}) ceramics. This investigation demonstrated that: (1) A rapid, flexible, cost efficient synthesis method of anhydrous lanthanum halides and their solid solutions was developed. Several batches of ultrafine LaBr{sub 3}:Ce{sup +3} powder, free of oxyhalide, were produced by a rigorously controlled process. (2) Micron size ({approx} 5 {micro}m), platelet shape LaBr{sub 3} seed particles of high purity can be synthesized by a vapor phase transport process. (3) High aspect-ratio seed particles can be effectively aligned in the shear direction in the ceramic matrix, using a rotational shear-forming process. (4) Small size, highly translucent LaBr{sub 3} (0.25-inch diameter, 0.08-inch thick) samples were successfully fabricated by the equal channel angular consolidation process. (5) Large size, high density, translucent LaBr{sub 3} ceramics samples (3-inch diameter, > 1/8-inch thick) were fabricated by hot pressing, demonstrating the superior manufacturability of the ceramic approach over single crystal growth methods in terms of size capability and cost. (6) Despite all these advances, evidence has shown that LaBr{sub 3} is thermally unstable at temperatures required for the densification process. This is particularly true for material near the surface where lattice defects and color centers can be created as bromine becomes volatile at high temperatures. Consequently, after densification these samples made using chemically prepared ultrafine powders turned black. An additional thermal treatment in a flowing bromine condition proved able to reduce the darkness of the surface layer for these densified samples. These observations demonstrated that although finer ceramic powders are desirable for densification due to a stronger driving force from their large surface areas, the same desirable factor can lead to lattice defects and color centers when these powders are densified at higher temperatures where material near the surface becomes thermally unstable.

  3. Determination of oxygen in molten alkali halide salts by proton activation analysis

    SciTech Connect (OSTI)

    Wai, C.M.; Dysart, M.E.

    1986-12-01T23:59:59.000Z

    The authors have recently used a lanthanum fluoride precipitation method to separate /sup 18/F produced from proton activation of /sup 18/O in alkali chloride and fluoride salts. The procedure was developed for studying dissolved oxide species in alkali halide melts. Determination of oxygen in these systems is important for research in batteries and in extractive metallurgy utilizing molten salts as solvents. The details are given oxygen determination in alkali chloride and fluoride systems.

  4. Lanthanum halide scintillators for time-of-flight 3-D pet

    DOE Patents [OSTI]

    Karp, Joel S. (Glenside, PA); Surti, Suleman (Philadelphia, PA)

    2008-06-03T23:59:59.000Z

    A Lanthanum Halide scintillator (for example LaCl.sub.3 and LaBr.sub.3) with fast decay time and good timing resolution, as well as high light output and good energy resolution, is used in the design of a PET scanner. The PET scanner includes a cavity for accepting a patient and a plurality of PET detector modules arranged in an approximately cylindrical configuration about the cavity. Each PET detector includes a Lanthanum Halide scintillator having a plurality of Lanthanum Halide crystals, a light guide, and a plurality of photomultiplier tubes arranged respectively peripherally around the cavity. The good timing resolution enables a time-of-flight (TOF) PET scanner to be developed that exhibits a reduction in noise propagation during image reconstruction and a gain in the signal-to-noise ratio. Such a PET scanner includes a time stamp circuit that records the time of receipt of gamma rays by respective PET detectors and provides timing data outputs that are provided to a processor that, in turn, calculates time-of-flight (TOF) of gamma rays through a patient in the cavity and uses the TOF of gamma rays in the reconstruction of images of the patient.

  5. 5/23/13 EBSCOhost ehis.ebscohost.com.libproxy.mit.edu/ehost/delivery?sid=24f6d6e6-10b5-495d-90c9-221fc19a83fe%40sessionmgr114&vid=5&hid=107 1/2

    E-Print Network [OSTI]

    Deutch, John

    -221fc19a83fe%40sessionmgr114&vid=5&hid=107 1/2 Database: Section: Record: 1 Cool thoughts on global warming. By: Deutch, J.M. Technology Review (00401692). May/Jun92, Vol. 95 Issue 4, p73. 1p. 1 Black on actions-such as those encouraging energy efficiency-that cost little and that have other benefits besides

  6. 5/23/13 EBSCOhost ehis.ebscohost.com.libproxy.mit.edu/ehost/delivery?sid=24f6d6e6-10b5-495d-90c9-221fc19a83fe%40sessionmgr114&vid=7&hid=107 1/2

    E-Print Network [OSTI]

    Deutch, John

    strike plan, and the number and types of nuclear delivery systems required to meet future security needs power. U.S. nuclear forces can deter aggression in unstable regions of the world. Saddam Hussein hasd6e6-10b5-495d-90c9-221fc19a83fe%40sessionmgr114&vid=7&hid=107 2/2 hard-line leadership of China

  7. REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni

    E-Print Network [OSTI]

    Dennett, Daniel

    REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni: It is our understanding that you need to replace your original diploma. We are glad to help you attain a replacement diploma. The items listed below are required replacement diploma. Please feel free to contact the LGBT Center at 617-627-3770 if you have questions

  8. Advances in the growth of alkaline-earth halide single crystals for scintillator detectors

    SciTech Connect (OSTI)

    Boatner, Lynn A [ORNL; Ramey, Joanne Oxendine [ORNL; Kolopus, James A [ORNL; Neal, John S [ORNL; Cherepy, Nerine [Lawrence Livermore National Laboratory (LLNL); Payne, Stephen A. [Lawrence Livermore National Laboratory (LLNL); Beck, P [Lawrence Livermore National Laboratory (LLNL); Burger, Arnold [Fisk University, Nashville; Rowe, E [Fisk University, Nashville; Bhattacharya, P. [Fisk University, Nashville

    2014-01-01T23:59:59.000Z

    Alkaline-earth scintillators such as strontium iodide and other alkaline-earth halides activated with divalent europium represent some of the most efficient and highest energy resolution scintillators for use as gamma-ray detectors in a wide range of applications. These applications include the areas of nuclear nonproliferation, homeland security, the detection of undeclared nuclear material, nuclear physics and materials science, medical diagnostics, space physics, high energy physics, and radiation monitoring systems for first responders, police, and fire/rescue personnel. Recent advances in the growth of large single crystals of these scintillator materials hold the promise of higher crystal yields and significantly lower detector production costs. In the present work, we describe new processing protocols that, when combined with our molten salt filtration methods, have led to advances in achieving a significant reduction of cracking effects during the growth of single crystals of SrI2:Eu2+. In particular, we have found that extended pumping on the molten crystal-growth charge under vacuum for time periods extending up to 48 hours is generally beneficial in compensating for variations in the alkaline-earth halide purity and stoichiometry of the materials as initially supplied by commercial sources. These melt-pumping and processing techniques are now being applied to the purification of CaI2:Eu2+ and some mixed-anion europium-doped alkaline-earth halides prior to single-crystal growth by means of the vertical Bridgman technique. The results of initial studies of the effects of aliovalent doping of SrI2:Eu2+ on the scintillation characteristics of this material are also described.

  9. A mechanistic study of aryl halide reactions with lithium aluminum hydride

    E-Print Network [OSTI]

    Chung, Fu-Fan

    1980-01-01T23:59:59.000Z

    A M:"CHA~JISTIC STUDv OF ARYL HALID RHAC IC~JS ' ITH LITHIUM ALUM 'J"M HYDRIDE A Thesis FU-FAJJ CHUI'JG Submitted to the Graduate College of Texas ARM University in nartial fulfillment of the reauirement for the degree of MASTER OF SCI- JC... of this stud!y :a to investigate possibility o f a. fr ee r a . 1 ca machina=--. by;;h:ch ". thium alum'num hydride may reduce organic ccmnounds. evzcus results have irdicated that thc reductior of o-allylcxy- 'oenzene diazonium icn by . ributyltin hydrioe...

  10. Kittiwakes strategically reduce investment in replacement clutches

    E-Print Network [OSTI]

    Alvarez, Nadir

    Kittiwakes strategically reduce investment in replacement clutches Julien Gasparini1,*, Alexandre). In birds, egg production is lower in replacement clutches than in first clutches, but it is unknown whether the replacement clutch is produced) or from a strategic allocation of resources between the two breeding attempts

  11. Energy Efficient Buffer Cache Replacement Jianhui Yue

    E-Print Network [OSTI]

    Zhu, Yifeng

    Energy Efficient Buffer Cache Replacement Jianhui Yue Univ. of Maine, Orono jyue for buffer caching and thus cache replacement becomes critical. This paper investi- gates the tradeoff between these two interacting factors and proposes three energy-aware buffer cache replacement al- gorithm

  12. General Adaptive Replacement Policies Yannis Smaragdakis

    E-Print Network [OSTI]

    Smaragdakis, Yannis

    General Adaptive Replacement Policies Yannis Smaragdakis College of Computing Georgia Institute of Technology yannis@cc.gatech.edu ABSTRACT We propose a general scheme for creating adaptive replace- ment any two existing replacement policies so that the resulting policy provably can never perform worse

  13. Cooperative Determination on Cache Replacement Candidates

    E-Print Network [OSTI]

    Chin, Francis Y.L.

    Cooperative Determination on Cache Replacement Candidates for Transcoding Proxy Caching Keqiu Li1- mination on cache replacement candidates for transcoding proxies. An original model which determines cache replacement candidates on all can- didate nodes in a coordinated fashion with the objective of minimizing

  14. Replacement Diploma Request University of Massachusetts Lowell

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 883. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

  15. Cache Replacement Policy Revisited Mohamed Zahran

    E-Print Network [OSTI]

    Zahran, Mohamed M.

    Cache Replacement Policy Revisited Mohamed Zahran Electrical Engineering Department City University of New York mzahran@ccny.cuny.edu Abstract Cache replacement policy is a major design parameter of any memory hierarchy. The efficiency of the replace- ment policy affects both the hit rate and the access la

  16. Article ID #eqr106 REPLACEMENT STRATEGIES

    E-Print Network [OSTI]

    Popova, Elmira

    Article ID #eqr106 REPLACEMENT STRATEGIES Elmira Popova Associate Professor, Department)-296-5795 e-mail: popovai@seattleu.edu Corresponding Contributor: Elmira Popova Keywords: Replacement Policies define what is a replacement policy for a system that fails randomly in time and its main characteristics

  17. Replacement Diploma Request University of Massachusetts Lowell

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 220. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

  18. Type-Logical Hyperedge Replacement Grammars

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Type-Logical and Hyperedge Replacement Grammars Draft Richard Moot LaBRI (CNRS), INRIA Bordeaux SW2009 #12;CONTENTS 1 Introduction 1 2 Hyperedge Replacement Grammars 3 2.1 Hypergraphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.2 Hyperedge Replacement . . . . . . . . . . . . . . . . . . . . . . . 4 2.3 Hyperedge

  19. PeopleAdmin Staff Straight Replacement

    E-Print Network [OSTI]

    Hutcheon, James M.

    1 PeopleAdmin ­ Staff Straight Replacement Guide #12;2 The staff straight replacement module will be used by hiring managers to request vacant, benefited positions be advertisedAdmin system, you will see this view. To begin the staff straight replacement process, you should click BEGIN

  20. Development of a Phosphate Ceramic as a Host for Halide-contaminated Plutonium Pyrochemical Reprocessing Wastes

    SciTech Connect (OSTI)

    Metcalfe, Brian; Fong, Shirley K.; Gerrard, Lee A.; Donald, Ian W.; Strachan, Denis M.; Scheele, Randall D.

    2007-03-31T23:59:59.000Z

    The presence of halide anions in four types of wastes arising from the pyrochemical reprocessing of plutonium required an immobilization process to be developed in which not only the actinide cations but also the halide anions were immobilized in a durable waste form. At AWE, we have developed such a process using Ca3(PO4)2 as the host material. Successful trials of the process with actinide- and Cl-bearing Type I waste were carried out at PNNL where the immobilization of the waste in a form resistant to aqueous leaching was confirmed. Normalized mass losses determined at 40°C and 28 days were 12 x 10-6 g?m-2 and 2.7 x 10-3 g?m-2 for Pu and Cl, respectively. Accelerated radiation-induced damage effects are being determined with specimens containing 238Pu. No changes in the crystalline lattice have been detected with XRD after the 239Pu equivalent of 400 years ageing. Confirmation of the process for Type II waste (a oxyhydroxide-based waste) is currently underway at PNNL. Differences in the ionic state of Pu in the four types of waste have required different surrogates to be used. Samarium chloride was used successfully as a surrogate for both Pu(III) and Am(III) chlorides. Initial investigations into the use of HfO2 as the surrogate for Pu(IV) oxide in Type II waste indicated no significant differences.

  1. Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions

    E-Print Network [OSTI]

    Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions vessels to use non-qualifying vessels in the sector, thus allowing replacement of a lost qualifying vessel of the CRP ambiguous as to whether replacement of qualifying vessels with non-qualifying vessels

  2. J. Am. Chem. SOC.1991, 113,9575-9585 9575 Mixed Aggregation of Lithium Enolates and Lithium Halides

    E-Print Network [OSTI]

    Collum, David B.

    J. Am. Chem. SOC.1991, 113,9575-9585 9575 Mixed Aggregation of Lithium Enolates and Lithium Halides with Lithium 2,2,6,6-Tetramethylpiperidide(LiTMP) Patricia L. Hall, James H. Gilchrist, Aidan T. Harrison]-lithiumdi-tert-butylamide and conformationally locked [6Li]-lithium2,2,4,6,6-pentamethylpiperidide shed further light

  3. Optimal scheduling for replacing perimeter guarding unmanned ...

    E-Print Network [OSTI]

    2014-08-20T23:59:59.000Z

    difference between charging batteries, automatically replacing batteries [11] or ... the discussion below to the use of batteries and battery charge, without loss of ...

  4. LED Replacements for Linear Fluorescent Lamps Webcast

    Broader source: Energy.gov [DOE]

    In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

  5. Nickel-catalyzed cross-couplings of unactivated secondary and tertiary alkyl halides and photoinduced copper-mediated asymmetric C-N cross-couplings

    E-Print Network [OSTI]

    Zultanski, Susan L. (Susan Lyn)

    2013-01-01T23:59:59.000Z

    Chapter 1 describes the development of two nickel-catalyzed Suzuki cross-coupling methodologies that employ alkyl halides as electrophiles. In Section 1.1, asymmetric [gamma]-alkylation relative to a carbonyl group is ...

  6. Development of a Phosphate Ceramic as a Host for Halide-Contaminated Plutonium Pyrochemical Reprocessing Wastes

    SciTech Connect (OSTI)

    Metcalfe, Brian; Fong, Shirley; Gerrard, Lee; Donald, Ian [MSRD, AWE plc, AWE Aldermaston, Reading, RG7 4PR (United Kingdom); Strachan, Denis; Scheele, Randall [PNNL, Richland, WA, 99352 (United States)

    2007-07-01T23:59:59.000Z

    The presence of halide anions in four types of wastes arising from the pyrochemical reprocessing of plutonium required an immobilization process to be developed in which not only the actinide cations but also the halide anions were immobilized in a durable, leach resistant form. AWE has developed such a process using Ca{sub 3}(PO{sub 4}){sub 2} as the host material. Successful trials of the process using actinide-doped Type I waste (essentially a chloride-based waste) were carried out at PNNL where the immobilization of the waste in a form resistant to aqueous leaching was confirmed. Normalized mass losses determined using a modified MCC-1 test at 40 deg. C/28 days were 12 x 10{sup -6} g.m{sup -2} and 2.7 x 10{sup -3} g.m{sup -2} for Pu and Cl, respectively. Accelerated radiation-induced damage effects are being determined with specimens containing {sup 238}Pu. No changes in the crystalline lattice have been detected with XRD after the {sup 239}Pu equivalent of 400 years ageing. Confirmation of the process for Type II waste (an oxyhydroxide-based waste) is currently underway at PNNL. Differences in the ionic state of plutonium in the four types of waste have required different surrogates to be used. Samarium chloride was used successfully as a surrogate for both Pu(III) and Am(III) chlorides. Early investigations into the use of HfO{sub 2} as the surrogate for Pu(IV) oxide in Type II waste showed some apparent differences in the phase assemblages of the surrogate and actinide-based products. However XRD examination of the products at higher resolution has demonstrated there is no significant difference and that for this work HfO{sub 2} is a suitable surrogate for PuO{sub 2}. (authors)

  7. Vehicle Technologies and Bus Fleet Replacement Optimization

    E-Print Network [OSTI]

    Bertini, Robert L.

    1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

  8. Page Replacement Algorithms To use a simulation for evaluating various page replacement algorithms studied in class.

    E-Print Network [OSTI]

    Stojmenovic, Ivan

    Operating Systems CSI3131 Lab 4 Winter 2011 Page Replacement Algorithms Objective To use a simulation for evaluating various page replacement algorithms studied in class. Description (Please read to compare the performance of each page replacement algorithm. The constructor of this class contains

  9. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21T23:59:59.000Z

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  10. Metallic halide lights and lighting systems. (Latest citations from the US Patent Bibliographic file with exemplary claims). Published Search

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    The bibliography contains citations of selected patents concerning the design and operation of metallic halide lights and lighting systems. High pressure, high intensity, and low wattage discharge lamps are described. Citations discuss power sources, lamp life, lamp control circuits, thermal switches, and heat reflective coatings. Applications in sport stadium lighting, vehicle headlights, and crop-lighting are included. (Contains a minimum of 170 citations and includes a subject term index and title list.)

  11. Calcium looping process for high purity hydrogen production integrated with capture of carbon dioxide, sulfur and halides

    DOE Patents [OSTI]

    Ramkumar, Shwetha; Fan, Liang-Shih

    2013-07-30T23:59:59.000Z

    A process for producing hydrogen comprising the steps of: (i) gasifying a fuel into a raw synthesis gas comprising CO, hydrogen, steam, sulfur and halide contaminants in the form of H.sub.2S, COS, and HX, wherein X is a halide; (ii) passing the raw synthesis gas through a water gas shift reactor (WGSR) into which CaO and steam are injected, the CaO reacting with the shifted gas to remove CO.sub.2, sulfur and halides in a solid-phase calcium-containing product comprising CaCO.sub.3, CaS and CaX.sub.2; (iii) separating the solid-phase calcium-containing product from an enriched gaseous hydrogen product; and (iv) regenerating the CaO by calcining the solid-phase calcium-containing product at a condition selected from the group consisting of: in the presence of steam, in the presence of CO.sub.2, in the presence of synthesis gas, in the presence of H.sub.2 and O.sub.2, under partial vacuum, and combinations thereof.

  12. Replacement solvents for use in chemical synthesis

    DOE Patents [OSTI]

    Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

    2001-05-15T23:59:59.000Z

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  13. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  14. Organic agriculture cannot replace conventional agriculture

    E-Print Network [OSTI]

    Kolokolnikov, Theodore

    Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

  15. Marin County- Wood Stove Replacement Rebate Program

    Broader source: Energy.gov [DOE]

    The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

  16. Evaluation of alternative sign replacement strategies 

    E-Print Network [OSTI]

    McCaleb, James Bradley

    1996-01-01T23:59:59.000Z

    values and guidelines will have a significant impact on TXDOT. The objective of this thesis was to determine the most cost effective strategy for TXDOT to implement in replacing traffic signs that do not meet the expected minimum retroreflectivity values...

  17. Beyond the Replacement Paradigm: Smart Lighting

    E-Print Network [OSTI]

    Salama, Khaled

    Switches · Smart Building & Grid Interfaces · Efficient full spectrum LEDs without droop · Versatile, low - Visible Light Communications Integration of smart fixtures, networked sensors and control systemsBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

  18. HID Laboratories Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, search OpenEI ReferenceJumpEnergyStrategy | Open Energy Sector:Ergenics Inc

  19. A replacement consideration in conductor economics

    E-Print Network [OSTI]

    Ciniglio Manzzo, Orlando Antonio

    1977-01-01T23:59:59.000Z

    A REPLACEMENT CONSIDERATION IN CONDUCTOR ECONOMICS A Thesis by ORLANDO ANTONIO CINIGLIO MANZZO Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August... 1977 Major Subject: Electrical Engineering A REPLACEMENT CONSIDERATION IN CONDUCTOR ECONOMICS A Thesis ORLANDO ANTONIO CINIGLIO MANZZO Approved as to style and content by: (Chairman of Committee) // f, ', , / j (Head of Depart'ment) Member...

  20. An optimal replacement problem in aluminum production

    E-Print Network [OSTI]

    Spanks, Lisa Marie

    1992-01-01T23:59:59.000Z

    AN OPTIMAL REPLACEMENT PROBLEM IN ALUMINUM PRODUCTION Thesis by LISA MARIE SPANKS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1992... Major Subject: Industrial Engineering AN OPTIMAL REPLACEMENT PROBLEM IN ALUMINUM PRODUCTION Thesis by LISA MARIE SPANKS Approved as to style and content by: Richard M. Feldman (Chair of Committee) James H. Matis (Member) ryan L. Deuermey r...

  1. A replaceable reflective film for solar concentrators

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  2. Deposition of refractory metal films by rare-gas halide laser photodissociation of metal carbonyls

    SciTech Connect (OSTI)

    Flynn, D.K.; Steinfeld, J.I.; Sethi, D.S.

    1986-06-01T23:59:59.000Z

    Films of Cr, Mo, and W on quartz, Pyrex, Suprasil, and Al substrates were deposited by photodissociation of the respective hexacarbonyls using focused and pulsed radiation from rare-gas halide lasers. Cr was deposited by dissociation of Cr(CO)/sub 6/ using XeF (308 nm), KrF (249 nm), and ArF (193 nm) lasers. Mo and W were deposited from their respective hexacarbonyls at 249 and 193 nm. Pulse energies varied between 8 and 12 mJ. Pulse rates of 10--60 Hz were used. The pulse duration was about 10 ns. Depositions with substrates both parallel and perpendicular to the excimer radiation were attempted. Only in the case of perpendicular configuration were strongly adherent films observed. The deposition rates for thicknesses up to 3000 A appeared to be independent of the pulse rate for all three metals. The films exhibited strong adhesion to the substrate. Scanning electron microscope photographs of the films revealed the presence of continuous metal layers. Auger and x-ray analyses of the films indicated contamination from carbon and oxygen. The source of these impurities is most likely to be CO produced in the decarbonylation of the parent hexacarbonyl. Adhesion to the substrate is apparently enhanced by laser stimulated generation of strong binding sites on the surface.

  3. LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS

    E-Print Network [OSTI]

    Jay Smith, Alan

    2011-01-01T23:59:59.000Z

    MIGRATION· PART II: FILE REPLACEMENT ALGORITHMS Alan Jaymay vary even though replacement fi~~d the pa~ameter value PIe N - P ;, RT I r:. fILE REPLACEMENT ALGORITHMS. I.lan ~1ar

  4. REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student Number: _________________________

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student: _________________________ Cheque Date: _____________________ CHEQUE AMOUNT: ________________________ REASON FOR REPLACEMENT Building at the address below. Please indicate how you would like to receive your replacement cheque

  5. Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars Richard Moot La (tree generating) hyperedge replacement grammars as an intermediate step. As a consequence both, using hyperedge replacement grammars as an intermediate step. 2 Tree Adjoining Grammars and Hyperedge

  6. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

  7. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Homeland Security & Defense Boron-10 Neutron Detectors for Helium-3 Replacement Boron-10 Neutron Detectors for Helium-3 Replacement As part of the Laboratory's national security...

  8. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of...

  9. HP replacement program increases efficiency, protection

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    For more than 50 years, compression equipment along the 2,000-mile Tennessee Gas Pipeline has been helping to supply natural gas needs for the Northeast. But increasing demand and a need for more environmentally safe equipment mean a major replacement program for the compressor stations that make the natural gas transmission possible. Today it is one of the longest gas pipelines in the world, carrying more than 1 Bcf/d of natural gas. New compression equipment is being installed to boost efficiency and meet more stringent environmental standards. In 1993, Tenneco Energy, purchased by El Paso Energy in December 1996, initiated a Horsepower Replacement Program intended to replace older, inefficient technology with more advanced equipment. A major objective was to improve operational effectiveness and to reduce harmful nitrogen oxide and carbon monoxide emissions by converting much of the machinery to electric-driven compression equipment.

  10. Valve assembly having remotely replaceable bearings

    DOE Patents [OSTI]

    Johnson, Evan R. (San Diego, CA); Tanner, David E. (Poway, CA)

    1980-01-01T23:59:59.000Z

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

  11. Fluidized bed boiler convective zone tube replacement

    SciTech Connect (OSTI)

    Not Available

    1991-03-21T23:59:59.000Z

    A major problem with the Georgetown University Atomspheric-Pressure, Fluidized-Bed Combustor-Boiler (GU AFBC) experienced during the first six years of operation was tube erosion. Previous corrective measures for in-bed tube erosion appeared to be effective, but excessive wear of the convective zone tubes was still occurring, and the entire heat transfer tube bundle in the boiler required replacement. In the planned project,the eroded tubes would be replaced, and the convective zone modified to eliminate the problem. Progress is discussed.

  12. Reversing Wolbachia-based population replacement

    E-Print Network [OSTI]

    Dobson, Stephen L.

    Wolbachia bacteria as a vehicle for population replace- ment. Also discussed are strategies strategies and provide mechan- isms for the autonomous spread of desired transgenes into the targeted relative to the natural population [15­17]. Primary candidates for gene-drive strategies are autonomous

  13. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.

    2012-12-01T23:59:59.000Z

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  14. THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES

    E-Print Network [OSTI]

    Previte, Joseph P.

    THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES JOSEPH PREVITE, MICHELLE PREVITE, AND MARY a vertex replacement rule given by exactly one replacement graph generates an infinite graph for the growth degree of infinite graphs with polynomial growth that are gener- ated by vertex replacement rules

  15. Orthopaedic Surgery Center of Joint Preservation and Replacement

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Hip Replacement new hip! You are going home after a successful total hip replacement. Although there is still much. The benefits of a total hip replacement are great, but they do take a while to be realized. Hip Precautions

  16. Orthopaedic Surgery Center of Joint Preservation and Replacement

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Knee Replacement are going home after a successful total knee replacement. Although there is still much work to do, we have replacement are great, but they do take a while to be realized. We have put together some helpful hints

  17. Gas Phase Chromatography of some Group 4, 5, and 6 Halides

    SciTech Connect (OSTI)

    Sylwester, Eric Robert

    1998-10-01T23:59:59.000Z

    Gas phase chromatography using The Heavy Element Volatility Instrument (HEVI) and the On Line Gas Apparatus (OLGA III) was used to determine volatilities of ZrBr{sub 4}, HfBr{sub 4}, RfBr{sub 4}, NbBr{sub 5}, TaOBr{sub 3}, HaCl{sub 5}, WBr{sub 6}, FrBr, and BiBr{sub 3}. Short-lived isotopes of Zr, Hf, Rf, Nb, Ta, Ha, W, and Bi were produced via compound nucleus reactions at the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory and transported to the experimental apparatus using a He gas transport system. The isotopes were halogenated, separated from the other reaction products, and their volatilities determined by isothermal gas phase chromatography. Adsorption Enthalpy ({Delta}H{sub a}) values for these compounds were calculated using a Monte Carlo simulation program modeling the gas phase chromatography column. All bromides showed lower volatility than molecules of similar molecular structures formed as chlorides, but followed similar trends by central element. Tantalum was observed to form the oxybromide, analogous to the formation of the oxychloride under the same conditions. For the group 4 elements, the following order in volatility and {Delta}H{sub a} was observed: RfBr{sub 4} > ZrBr{sub 4} > HfBr{sub 4}. The {Delta}H{sub a} values determined for the group 4, 5, and 6 halides are in general agreement with other experimental data and theoretical predictions. Preliminary experiments were performed on Me-bromides. A new measurement of the half-life of {sup 261}Rf was performed. {sup 261}Rf was produced via the {sup 248}Cm({sup 18}O, 5n) reaction and observed with a half-life of 74{sub -6}{sup +7} seconds, in excellent agreement with the previous measurement of 78{sub -6}{sup +11} seconds. We recommend a new half-life of 75{+-}7 seconds for {sup 261}Rf based on these two measurements. Preliminary studies in transforming HEVI from an isothermal (constant temperature) gas phase chromatography instrument to a thermochromatographic (variable temperature) instrument have been completed. Thermochromatography is a technique that can be used to study the volatility and {Delta}H{sub a} of longer-lived isotopes off-line, Future work will include a comparison between the two techniques and the use of thermochromatography to study isotopes in a wider range of half-lives and molecular structures.

  18. Developing Business Case for Electrical System Replacement

    E-Print Network [OSTI]

    Miller, Carles

    2006-05-19T23:59:59.000Z

    and distribution equipment. This paper is a great resource for technical information concerning failure rates of electrical system protective relaying. ?Upgrading and Enhancing the Generator Protection System by Making Use of Digital Systems?, published.... This paper focus on upgrading generation plant electrical systems and is a good reference for performing generator relay protection upgrades. Chapter 2 ? Literature Review Page 7 of 47 Developing Business Case For Electrical System Replacement Projects...

  19. Halide, Chromate, and Phosphate Impacts on LAW Glass for Dynamic Flowsheet 24590-WTP-MCR-PET-09-0037, Rev. 1

    SciTech Connect (OSTI)

    Gimpel, Rodney F.; Kruger, Albert A.

    2013-12-16T23:59:59.000Z

    Revision 1 of this Model Change Request changed Equation 6 in Attachment Al only. Melter studies have shown that halide, chromium, and phosphates can cause precipitation of solids that can interfer the melting process. Pilot melter data now shows what concentrations LAW glass can tolerate. These limits shall be incorporated into the existing LAW glass algorithm per Attachment Al.

  20. Flow boiling test of GDP replacement coolants

    SciTech Connect (OSTI)

    Park, S.H. [comp.

    1995-08-01T23:59:59.000Z

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C{sub 4}F{sub 10} and C{sub 4}F{sub 8}, were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C{sub 4}F{sub 10} mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C{sub 4}F{sub 10} weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd.

  1. adaptive dynamic replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Who Replaces Whom? Local versus Non-local Replacement in Social and Evolutionary Dynamics CERN Preprints Summary: In this paper, we inspect well-known population genetics and...

  2. Magnesium Replacement of Aluminum Cast Components in a Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a Production V6...

  3. Replacing PG and E's Milpitas terminal

    SciTech Connect (OSTI)

    Rawcliffe, R.S.; Maceyka, R.A. (Pacific Gas and Electric Co., San Francisco, CA (US))

    1991-07-01T23:59:59.000Z

    This paper reports that Pacific Gas and Electric Co.'s Milpitas Terminal was originally built in 1929, when natural gas was first brought to the San Francisco Bay Area from the Kettleman Hills gas fields. This paper reports that in 1985, a project was begun to replace the old terminal due to maintenance problems, odor complaints and unaccounted-for gas due to poor measurement quality. The location of the terminal was also a problem. A proposed highway expansion would encroach into the yard area where the existing pipeline was located. In addition, the original location was in agricultural lands, which was changing to commercial use.

  4. Replacing an Oversized and Underloaded Electric Motor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0 Replace2-AIncandescent1

  5. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

  6. Sensitivity of alkali halide scintillating calorimeters with particle identification to investigate the DAMA dark matter detection claim

    E-Print Network [OSTI]

    Patrick Nadeau; Michael Clark; P. C. F. Di Stefano; J. -C. Lanfranchi; S. Roth; M. von Sivers; Itay Yavin

    2015-04-07T23:59:59.000Z

    Scintillating calorimeters are cryogenic detectors combining a measurement of scintillation with one of phonons to provide particle identification. In view of developing alkali halide devices of this type able to check the DAMA/LIBRA claim for the observation of dark matter, we have simulated detector performances to determine their sensitivity by two methods with little model-dependence. We conclude that if performance of the phonon channel can be brought in line with those of other materials, an exposure of 10 kg-days would suffice to check the DAMA/LIBRA claim in standard astrophysical scenarios. Additionally, a fairly modest array of 5 kg with background rejection would be able to directly check the DAMA/LIBRA modulation result in 2 years.

  7. Computer Replacement Guidelines Environmental Health and Safety, Stanford University

    E-Print Network [OSTI]

    Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

  8. Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1

    E-Print Network [OSTI]

    Holder, Lawrence B.

    Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1 , Lawrence B. Holder2 , and Diane J@eecs.wsu.edu Abstract We describe an algorithm and experiments for inference of edge replacement graph grammars for inference of Node Replacement Recursive Graph Grammars [7]. In this paper we describe an approach

  9. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    L'Ecuyer, Pierre

    1 FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; 2 L'ECUYER, MARTIN, AND V ' AZQUEZ

  10. 1 INTRODUCTION The replacement investment decision is clearly a

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 INTRODUCTION The replacement investment decision is clearly a strategic objective of a company for the replacement decision largely depends on the company context. However, we can summarize the motivations leading over time and prove that the replacement policy at equal intervals is optimum. However, the linear

  11. Application for Amendment 80 Vessel Replacement Page 1 of 6

    E-Print Network [OSTI]

    Application for Amendment 80 Vessel Replacement Page 1 of 6 Revised: 12/23/2013 OMB Control No. 0648-0565 Expiration Date: 01/31/2016 APPLICATION FOR AMENDMENT 80 VESSEL REPLACEMENT United States OF THE AMENDMENT 80 VESSEL BEING REPLACED 1. Vessel Name: 2. ADF&G Vessel Registration No.: 3. USCG Documentation

  12. Page Replacement and Reference Bit Emulation in Mach

    E-Print Network [OSTI]

    Page Replacement and Reference Bit Emulation in Mach Richard P. Draves rpd@cs.cmu.edu School of Computer Science Carnegie Mellon University 5000 Forbes Avenue Pittsburgh, PA 15213 Abstract A page­replacement in software. This paper describes the Mach kernel's page­replacement algorithm and considers three software

  13. The Cosmic Origins Spectrograph: A Hubble Replacement Instrument

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    The Cosmic Origins Spectrograph: A Hubble Replacement Instrument for the 2002 Reservicing Mission Origins Spectrograph (COS) has recently been selected as a replacement instrument for the Hubble Space Telescope. Installation is scheduled for late 2002, replacing COSTAR, which at that time will be unnecessary

  14. Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY

    E-Print Network [OSTI]

    Feschotte, Cedric

    Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY Updated: 08/26/09 Use this form to request a replacement or additional diploma. · The name on your diploma must be the same the Registrar's Office, Registration and Records Division prior to requesting your replacement diploma

  15. Cache Replacement Policy Using Map-based Adaptive Insertion

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Cache Replacement Policy Using Map-based Adaptive Insertion Yasuo Ishii The University of Tokyo insertion policy (MAIP) for a novel cache replacement. The MAIP estimates the data reuse possibility policy. 1. INTRODUCTION The cache replacement policy plays an important role in improving system

  16. University of Utah Payroll Department Stop Payment -Replacement Form

    E-Print Network [OSTI]

    Provancher, William

    University of Utah Payroll Department Stop Payment - Replacement Form Affidavit to request replacement of a lost, stolen, or damaged, payroll check. Please note that it takes 5 to 7 days to process is given to induce a replacement check for one originally issued. 3. I agree to indemnify and hold

  17. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vázquez-Abad, Felisa J.

    FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ

  18. Node discovery and replacement using mobile Kalypso Magklara1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Node discovery and replacement using mobile robot Kalypso Magklara1 , Dimitrios Zorbas1 and Tahiry, that discovers the nodes around it and replaces the active nodes, whose energy is drained, by fully charged and that decide, which nodes to replace. We simulate our algorithms and our findings show that all nodes that fail

  19. REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE

    E-Print Network [OSTI]

    Barrash, Warren

    REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE Administration Building, Room 110-3169 The replacement diploma will bear the signatures of the current University President and Registrar and have the words Replacement Diploma printed under the university seal. Allow 3-4 weeks for delivery. You

  20. Application for Replacement JCU Award (Certificate/Testamur) -FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD

    E-Print Network [OSTI]

    Application for Replacement JCU Award (Certificate/Testamur) - FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD (CERTIFICATE/TESTAMUR) 1. PERSONAL DETAILS JCU Student Number (8 digits): Title: rDr r after the fee is paid. · Replacement Testamurs - $70 (Diploma, Bachelor, Master and Doctoral

  1. Application Form for Replacement Diploma/Program Certificate (Form must be notarized)

    E-Print Network [OSTI]

    Application Form for Replacement Diploma/Program Certificate (Form must be notarized) Complete to Princeton University as follows: Replacement Diploma - $75 Replacement Program Certificate - $30 Please

  2. Energy Efficiency and Conservation Block Grant Program

    Broader source: Energy.gov (indexed) [DOE]

    1) Upgrade lighting and metal halide fixtures along Emma Street with light-emitting diode (LED) fixtures; 2) replace metal halide fixtures in Murphy and Hunt Parks; 3)...

  3. Replacement of the Advanced Test Reactor control room

    SciTech Connect (OSTI)

    Durney, J.L.; Klingler, W.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

    1989-01-01T23:59:59.000Z

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab.

  4. The opportunistic replacement problem: analysis and case studies

    E-Print Network [OSTI]

    Torgny Almgren

    2009-01-22T23:59:59.000Z

    Jan 22, 2009 ... The opportunistic replacement problem: analysis and case studies. Torgny Almgren (Torgny.Almgren ***at*** volvo.com) Niclas Andreasson ...

  5. androgen replacement therapy: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 153 LATTICE PATHS, SAMPLING...

  6. arthroplasty replacement hip: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 144 LATTICE PATHS, SAMPLING...

  7. Heavy-Duty Natural Gas Drayage Truck Replacement Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heavy-Duty Natural Gas Drayage Truck Replacement Program Principal Investigator: Vicki White South Coast Air Quality Management District May 16, 2012 Project ID ARRAVT045 This...

  8. arthroplasty replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

  9. aegypti population replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Juliano, Steven A. 6 2132014 Household explosion replaces population explosion as world concern -UPI.com http:www.upiasia.comScience-Technology20140211...

  10. Plutonium finishing plant safeguards and security systems replacement study

    SciTech Connect (OSTI)

    Klear, P.F.; Humphrys, K.L.

    1994-12-01T23:59:59.000Z

    This document provides the preferred alternatives for the replacement of the Safeguards and Security systems located at the Hanford Plutonium Finishing Plant.

  11. FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART 1.

    E-Print Network [OSTI]

    Carmichael, Sarah

    FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART F. McDONOUGH*** ABSTRACT. Replacement dolomite in the Latemar carbonate buildup, northern Italy of vertical columns (replacement of limestone breccia pipes) and sheets (replacement along fractures

  12. THE EFFECTS OF HALIDE MODIFIERS ON THE SORPTION KINETICS OF THE LI-MG-N-H SYSTEM

    SciTech Connect (OSTI)

    Anton, D.; Gray, J.; Price, C.; Lascola, R.

    2011-07-20T23:59:59.000Z

    The effects of different transition metal halides (TiCl{sub 3}, VCl{sub 3}, ScCl{sub 3} and NiCl{sub 2}) on the sorption properties of the 1:1 molar ratio of LiNH{sub 2} to MgH{sub 2} are investigated. The modified mixtures were found to contain LiNH{sub 2}, MgH{sub 2} and LiCl. TGA results showed that the hydrogen desorption temperature was reduced with the modifier addition in this order: TiCl{sub 3} > ScCl{sub 3} > VCl{sub 3} > NiCL{sub 2}. Ammonia release was not significantly reduced resulting in a weight loss greater than the theoretical hydrogen storage capacity of the material. The isothermal sorption kinetics of the modified systems showed little improvement after the first dehydrogenation cycle over the unmodified system but showed drastic improvement in rehydrogenation cycles. X-ray diffraction and Raman spectroscopy identified the cycled material to be composed of LiH, MgH{sub 2}, Mg(NH{sub 2}){sub 2} and Mg{sub 3}N{sub 2}.

  13. Enhanced open voltage of BiFeO{sub 3} polycrystalline film by surface modification of organolead halide perovskite

    SciTech Connect (OSTI)

    Zhao, Pengjun [Key Laboratory of Functional Materials and Devices for Special Environments, Chinese Academy of Sciences, Xinjiang Key Laboratory of Electronic Information Materials and Devices, Xinjiang Technical Institute of Physics and Chemistry, Chinese Academy of Sciences, Urumqi 830011 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Bian, Liang; Xu, Jinbao, E-mail: xujb@ms.xjb.ac.cn; Chang, Aimin [Key Laboratory of Functional Materials and Devices for Special Environments, Chinese Academy of Sciences, Xinjiang Key Laboratory of Electronic Information Materials and Devices, Xinjiang Technical Institute of Physics and Chemistry, Chinese Academy of Sciences, Urumqi 830011 (China); Wang, Lei [Key Laboratory of Functional Materials and Devices for Special Environments, Chinese Academy of Sciences, Xinjiang Key Laboratory of Electronic Information Materials and Devices, Xinjiang Technical Institute of Physics and Chemistry, Chinese Academy of Sciences, Urumqi 830011 (China); Department of Research and Development, Shanghai Shanshan Tech. Co., Ltd., Shanghai 201209, China and Department of Chemistry, Zhejiang University, Hangzhou 310027 (China)

    2014-07-07T23:59:59.000Z

    Inorganic-organolead halide perovskite CH{sub 3}NH{sub 3}PbI{sub 3} modified BiFeO{sub 3} polycrystalline film has been established. The composite photoelectrode presents much larger open voltage and several magnitudes superior photoelectric conversion performance in comparison to the ordinary BiFeO{sub 3} polycrystalline film. The I-V curve shows that the short-circuit current (J{sub sc}) is 1.74?mA·cm{sup ?2} and open-circuit voltage (V{sub oc}) is 1.62?V, the device's photon to current efficiency is over 1%. The large open voltage and high photovoltaic efficiency is believed to attributed to the spontaneous polarization of composite perovskite induced by BiFeO{sub 3} lattice and modified reduced work function of the modified BiFeO{sub 3} surface. Our results clearly show that the present BiFeO{sub 3}-CH{sub 3}NH{sub 3}PbI{sub 3} planar device is capable to generate a large voltage in macro scale under visible light, leading an approach to further applications on photodetectors and optoelectronic switch.

  14. CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING

    E-Print Network [OSTI]

    CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING Authors: · James H Hines (MIT changes are needed. The paper describes an extensive experiment with using this approach to construct with another molecule. Using this tool kit, users can rapidly construct new simulation models by replacing

  15. Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication

    SciTech Connect (OSTI)

    Megan Donahue

    2009-02-24T23:59:59.000Z

    A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

  16. RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS

    E-Print Network [OSTI]

    Cizelj, Leon

    RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

  17. Lead (II) selenite halides Pb{sub 3}(SeO{sub 3}){sub 2}X{sub 2} (X = Br, I): Synthesis and crystal structure

    SciTech Connect (OSTI)

    Berdonosov, P. S., E-mail: berdonosov@inorg.chem.msu.ru; Olenev, A. V.; Dolgikh, V. A. [Moscow State University (Russian Federation)

    2012-03-15T23:59:59.000Z

    Two lead selenite halides, Pb{sub 3}(SeO{sub 3}){sub 2}Br{sub 2} and Pb{sub 3}(SeO{sub 3}){sub 2}I{sub 2}, have been prepared by solid-phase synthesis and structurally characterized. These compounds are isotypic and can be considered 3D with a microporous framework composed of lead polyhedra (distorted Archimedean antiprisms formed by oxygen and halogen atoms). The framework contains channels oriented in the [010] direction. These channels contain selenium atoms, which are bound with framework oxygen atoms belonging to different lead polyhedra.

  18. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  19. Ultrasound image guided acetabular implant orientation during total hip replacement

    DOE Patents [OSTI]

    Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

    2003-08-19T23:59:59.000Z

    A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

  20. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect (OSTI)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23T23:59:59.000Z

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  1. Replacement of Data from IHS With Those from HPDI

    U.S. Energy Information Administration (EIA) Indexed Site

    Replacement of Data from IHS With Those from HPDI The EIA-914 estimation methodology published in September 2005 used data from IHS, Inc., as a source for calibration of historical...

  2. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

  3. Milling Machine Replacement Project (4587), 5/11/2012

    Broader source: Energy.gov (indexed) [DOE]

    by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital...

  4. Drop-in replacement biofuels : meeting the challenge

    E-Print Network [OSTI]

    Bhargava, Alok (Alok Kishore)

    2011-01-01T23:59:59.000Z

    This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

  5. Developing a total replacement cost index for suburban office projects

    E-Print Network [OSTI]

    Hansen, David John, S.M. Massachusetts Institute of Technology

    2006-01-01T23:59:59.000Z

    Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

  6. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  7. Replacing Motors Counting Savings: Results from a 100 Motor Study

    E-Print Network [OSTI]

    Kaufman, N. M.

    2006-01-01T23:59:59.000Z

    REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

  8. Prioritizing Water Pipe Replacement and Rehabilitation by Evaluating Failure Risk

    E-Print Network [OSTI]

    Lee, Sang Hyun

    2012-02-14T23:59:59.000Z

    PRIORITIZING WATER PIPE REPLACEMENT AND REHABILITATION BY EVALUATING FAILURE RISK A Thesis by SANG HYUN LEE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... 2011 Sang Hyun Lee PRIORITIZING WATER PIPE REPLACEMENT AND REHABILITATION BY EVALUATING FAILURE RISK A Thesis by SANG HYUN LEE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

  9. Replacing Motors Counting Savings: Results from a 100 Motor Study 

    E-Print Network [OSTI]

    Kaufman, N. M.

    2006-01-01T23:59:59.000Z

    REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

  10. Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each

    E-Print Network [OSTI]

    Guenther, Frank

    Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each replacement diploma is $25.00 ($35.00 for D.M.D, J.D., LL.M., and M.D). Please fill out the applicable information and mail it to the address below. Replacement

  11. Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2

    E-Print Network [OSTI]

    Habel, Annegret

    Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2 1 Carl v. Ossietzky. TAGT'98, Universitat-GH Paderborn, 182-189, 1998. Node replacement and hyperedge replacement are two, we combine both concepts to a concept of atom replacement that allows the replacement of the atomic

  12. Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles

    E-Print Network [OSTI]

    Kossin, James P.

    Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles replacement cycles are commonly observed in tropical cyclones and are well known to cause fluctuations associated with eyewall replacement cycles in Atlantic Ocean hurricanes. The model input comprises

  13. Functional replacement of a primary metabolic pathway via multiple independent eukaryote-to-eukaryote gene transfers

    E-Print Network [OSTI]

    Nedelcu, Aurora M.

    Functional replacement of a primary metabolic pathway via multiple independent eukaryote can be added to the recipient's gene complement (gene additions) or simply replace existing endogenous counterparts (functional replacements). The recruitment of novel genes is thought to allow the recipient

  14. Microstructure, Mechanical Behavior, and Clinical Trade-offs in Ultra-High Molecular Weight Polyethylene for Total Joint Replacement

    E-Print Network [OSTI]

    Atwood, Sara Anne

    2010-01-01T23:59:59.000Z

    components for total joint replacement. J Bone Joint Surgcontemporary total knee replacements. Clin Orthop Relat Res(wear in total joint replacement? J Am Acad Orthop Surg, 16

  15. Hanford Identification (HID) PIA, Richland Operations Office | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy: Thomas P. D'Agostino,GlenLearning and DevelopmentDepartmentof

  16. RAPID/Roadmap/18-HI-d | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ | Roadmap Jump to: navigation, search RAPIDaUT-abb <HI-d

  17. RAPID/Roadmap/3-HI-d | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ | Roadmap Jump to: navigation, searche < (1)NV-a3ed <

  18. RAPID/Roadmap/6-HI-d | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ | Roadmap Jump to: navigation, searcheWA-a < RAPID‎cd

  19. RAPID/Roadmap/14-HI-d | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethodInformation TexasTexas)ID-a <RAPID/Roadmap/14adFD-cad

  20. Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

  1. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21T23:59:59.000Z

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  2. Computer Integrated Revision Total Hip Replacement Surgery: Preliminary Report

    E-Print Network [OSTI]

    Taubin, Gabriel

    in a primary case because there is little good bone left and because the surgical manipulations are more deliComputer Integrated Revision Total Hip Replacement Surgery: Preliminary Report Leo Joskowicz1 milling, and the re- duction of bone sacri ced to t the new implant. Our starting points are Robodoc

  3. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect (OSTI)

    Simmons, Blake

    2013-05-29T23:59:59.000Z

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  4. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema (OSTI)

    Simmons, Blake

    2014-06-24T23:59:59.000Z

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  5. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  6. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  7. Electrical Equipment Replacement: Energy Efficiency versus System Compatibility

    E-Print Network [OSTI]

    Massey, G. W.

    2005-01-01T23:59:59.000Z

    upgrading electrical equipment to energy efficient models, including conductor sizing, overcurrent protective devices, grounding, and harmonics. The pages that follow provide guidance in the decision-making process when replacing electrical equipment... equipment. Several areas of compatibility must be addressed for equipment to work properly. Critical areas of concern are conductor sizing, overcurrent protection devices, grounding, and harmonics. Conductor Sizing Conductors are sized...

  8. Data Mining For Prediction of Aircraft Component Replacement

    E-Print Network [OSTI]

    Matwin, Stan

    Data Mining For Prediction of Aircraft Component Replacement Sylvain Letourneau1 Fazel Famili1 Stan the number of delays, and increasing the overall level of safety. Several data mining techniques exist from the data obtained during the operation and maintenance of aircraft is extremely challenging. Di

  9. Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures

    E-Print Network [OSTI]

    Llanos, Diego R.

    Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures Diego R discuss the behavior of the replacement mechanism of well-known COMA protocols applied to a loosely replacement mecha- nism in order to select the destination node of a replacement transaction without

  10. University of South Carolina Office of the University Registrar Request for Replacement Diploma

    E-Print Network [OSTI]

    Almor, Amit

    University of South Carolina Office of the University Registrar P F Request for Replacement Diploma Please Note Replacement diplomas are duplicates of the original diploma issued by USC. A request on the replacement diploma will reflect those of the current University Officers. Replacements can take up to 90 days

  11. Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement on known causes for insufficiencies of transcutaneous heart valve replacements. Out of that information

  12. Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25, 2012)

    E-Print Network [OSTI]

    Shoubridge, Eric

    Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25 or Replacement of an Investigator's Brochure or Product Monograph This form replaces a letter of explanation from or replacement of an Investigator's Brochure Page 2 of 2 (Version: January 25, 2012) 5) List all forms

  13. Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    Page | 1 Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and return this form to Examinations students You will not be charged for this service. A replacement transcript can be supplied

  14. Replacement geometry and fabrics of Smackover (Jurassic) dolomite, southern Alabama

    SciTech Connect (OSTI)

    Barrett, M.L.

    1986-09-01T23:59:59.000Z

    The intensity of dolomitization and associated reservoir development in the Smackover Formation, Conecuh Ridge-Wiggens arch areas, is not predictable by comparison with time-temperature index methods or porosity-depth curves. Major alteration patterns and associated dolomite fabrics reflect the early paleotopographic settings, where high fluid flux and massive replacement are associated with Late Jurassic basement highs. This large-scale replacement is most important in the lowermost Smackover section overlying the Norphlet sandstone from Chunchula field into the Manila Embayment. The heterogeneous nature of dolomite reservoir development is evident in Chunchula field, where local pods of permeable dolomite cut across sedimentary facies boundaries. Predicting the orientation of a dolomite permeability barrier where there is little well control can be facilitated by mapping the regional thickness variations; the extension of impermeable dolomite trends is generally parallel to isopach trends.

  15. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Broader source: Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  16. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01T23:59:59.000Z

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  17. Federal Aviation Administration National Engine Generator Replacement Project

    SciTech Connect (OSTI)

    Sturm, C.C.

    1995-12-31T23:59:59.000Z

    The Federal Aviation Administration (FAA) is undertaking a major project to replace aging engine generators over the next few years. The engine generators currently installed at various National Airspace System (NAS) facilities such as airport traffic control towers and radars provide standby power critical to the safe operation of air traffic in the NAS. This paper will describe the FAA engine generator set (EGS) replacement decision process, procurement options, technical requirements and installation criteria to replace up to 3,000 existing EGS`s and establish additional EGS`s for new equipment installations. Each EGS includes an engine, alternator, automatic transfer switch, load bank, environmentally safe day tank and battery charger. Buying commercial-off-the-shelf (COTS) EGS equipment instead of using a development procurement with a detailed technical specification, provides an opportunity to do business in a new way for the FAA and a vehicle to procure EGS`s with proven quality and performance. Logistics support (parts support) will be provided by the COTS EGS supplier at a fixed cost over the five year contract life. Pre-award EGS benchmark testing gave the FAA an opportunity to closely look at EGS`s recently manufactured and configured to simulate an actual FAA installation.

  18. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  19. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  20. Overview of CFC replacement issues for household refrigeration

    SciTech Connect (OSTI)

    Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

    1991-12-31T23:59:59.000Z

    In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

  1. Geography Access Control / Identification Application Application Type: New Update/Addition Replacement Temporary

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    /Addition Replacement Temporary The following is to be completed by the employee (type or print legibly): Last name _____________________ $15 Access & Identification, $10 Identification Card only, $10 replacement fee for either Affiliation

  2. RandomString is a small web application, containing one java servlet. It allows users to enter a list of strings to be randomly chosen with two options: with replacement or without replacement (default).

    E-Print Network [OSTI]

    Offutt, Jeff

    a list of strings to be randomly chosen with two options: with replacement or without replacement of strings and choosing them randomly with two options: with replacement or without replacement (default strings are separated by carriage return. 2. User selects to randomly choose strings `without replacement

  3. Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-04T23:59:59.000Z

    CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

  4. Height Replacement of Selected Woody Plants Following Burning or Shredding.

    E-Print Network [OSTI]

    Hamilton, W.T.; Kitchen, L.M.; Scifres, C.J.

    1981-01-01T23:59:59.000Z

    periods. %e e ' riment was designed as a rm=trd cmnplete+bloCL deskgn with t a o repticatbms. T h g S i g h empioped 9 h e - 'hie -wewin bo:*iriny of the l&a ' dfded o P - the plots (Scifps 1ss81. i?w ~rmeYIt l~p-m~tr lLed ltjeIt'trcwMs, 3.T by...- tions accounted for 87 pecmt of the variation in height change of blackbrush acacia. Burning did -@t affect height increase based on comparison with unburned blackbrush acacia. Blackbrush acacia height replacement was slower than that of honey mes...

  5. California: SQAMD Replaces Drayage Trucks with CNG | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platformBuilding RemovalCSS Letter -September 16,DOECalifornia: SQAMD Replaces

  6. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccessAlamosCharacterization2Climate,Cobalt discovery replaces

  7. LED T8 Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas » MethaneJohnsonKristina Pflanz About UsT8 Replacement

  8. Replacing an Oversized and Underloaded Electric Motor | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prevQuickEnergy V-Belts with Notched orEnergy Replacing

  9. Replace V-Belts with Notched or Synchronous Belt Drives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0 Replace

  10. History-Dependent Optimization of Bridge Maintenance and Replacement Decisions Using Markov Decision Process

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, Samer M

    2007-01-01T23:59:59.000Z

    ?1997?. “Pontis: A system for maintenance optimization andcycle reliability-based maintenance cost optimization ofbridge inspection, maintenance and replacement optimization

  11. Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Escoi

    E-Print Network [OSTI]

    Muńoz, Francesc

    Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Esco´i InstitutoMiedesetal.:DynamicTotalOrderProtocolReplacementITI-SIDI-2012/009 #12;#12;Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Esco

  12. Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions

    E-Print Network [OSTI]

    Montes-Hernandez, German

    Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

  13. Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1;3 .

    E-Print Network [OSTI]

    Cocco, Nicoletta

    Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1@zenone.math.unipd.it, cocco@moo.dsi.unive.it, etalle@cwi.nl October 13, 1994 Abstract The simultaneous replacement results for Fitting's and Kunen's semantics. We also show how simultaneous replacement can mimic other

  14. Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jimenez

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jim´enez Department of Computer Science The University of Texas at San Antonio Abstract We present a cache replacement and bypass policy driven by dead block prediction. A block is considered dead is it will be replaced before

  15. evolution via the replacement of two-membrane plastids would have to be

    E-Print Network [OSTI]

    McFadden, Geoff

    evolution via the replacement of two- membrane plastids would have to be accompanied by the origin be easily overcome by assuming that four-membrane plastids have evolved via the replacement of three-membrane plastids would be an example of a secondary (replacement of a prokaryotic by a eukaryotic plastid

  16. Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view-cache replacement policy can be modified for self- performance to be meaningful. Categories and Subject Descriptors multicore processor, quality of service, self-per- formance, shared cache, replacement policy, memory band

  17. Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT

    E-Print Network [OSTI]

    Buehrer, R. Michael

    Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT PAGE 1 OF 1, NOVEMBER 2013 REQUEST FOR GRADUATE DIPLOMA REPLACEMENT/REPRINT Return your completed form to: Graduate School Graduate of the replacement diploma. Current graduate diplomas measure 11" by 14". Your diploma will be printed with the legal

  18. Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4

    E-Print Network [OSTI]

    Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES ­ REPLACEMENT REQUEST (Check Only the Items That Apply) PART I ­ BSAI Crab Permits and Scallop Permits [ ] Crab

  19. Biased Replacement Policies for Web Caches: Differential QualityofService and Aggregate User Value \\Lambda

    E-Print Network [OSTI]

    Jamin, Sugih

    Biased Replacement Policies for Web Caches: Differential Quality­of­Service and Aggregate User reduction to different degrees, a replacement policy which priori­ tizes cache space across servers can­frequently­used (LFU) replacement that is sensitive to varying levels of server valuation for cache hits. Through trace

  20. STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM

    E-Print Network [OSTI]

    STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-4R TESTING CF-4R-MECH-20 Duct Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings

  1. Image-Based Texture Replacement Using Multiview Images Technion Israel Inst. of Technology

    E-Print Network [OSTI]

    Tal, Ayellet

    Image-Based Texture Replacement Using Multiview Images Doron Tal Technion ­ Israel Inst replacement is one such task. It is the process of painting a new texture over an ex- isting textured image for perform- ing texture replacement, which is based on multiview stereo tech- niques that produce depth

  2. Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement

    E-Print Network [OSTI]

    Omiecinski, Curtis

    100 Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement Dipnil replacement. The purpose of this study was to use computer simulation to study the effects of resecting too-tissue tensions, and articular contact forces. INTRODUCTION Total knee replacement (TKR) is a reliable and widely

  3. Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart

    E-Print Network [OSTI]

    Garland, Michael

    Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart Department of Computer Science University of Illinois at Urbana­Champaign Figure 1: Replaced materials replacement has wide application through- out the entertainment industry, particularly for post- production

  4. Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement

    E-Print Network [OSTI]

    Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement replacement may out-perform prior-specific training in some aspects of the quality of the estimated posterior, since the prior is known analytically, the posterior can also be estimated by prior replacement. To do

  5. Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W. Weide

    E-Print Network [OSTI]

    Weide, Bruce W.

    Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W nsridhar,pike,weide @cis.ohio-state.edu Abstract Dynamic module replacement -- the ability to hot swap-neutral technique for dynamic module replacement using Service Facilities (Serfs) -- a pattern- based design

  6. Replacement Diploma Name Change Office of Records and Registration rev. 06/11

    E-Print Network [OSTI]

    Bolding, M. Chad

    Replacement Diploma Name Change Office of Records and Registration rev. 06/11 Clemson University will provide a replacement or additional diploma to graduates of the University for a fee of $50.00 per diploma. Replacement and additional diplomas are printed on paper stock being used by the University at the time

  7. Application for a Replacement Testamur ADM18-V02/14

    E-Print Network [OSTI]

    Albrecht, David

    Application for a Replacement Testamur ADM18-V02/14 RECEIVED Please retain this copy as proof an institution that has amalgamated with Monash University may apply for a replacement testamur if their original the application form. Damaged: If you require a replacement testamur because your original testamur is damaged, we

  8. ON THE LINEAR GROWTH OF THE SPLITANDMERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vázquez-Abad, Felisa J.

    ON THE LINEAR GROWTH OF THE SPLIT­AND­MERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT Functional estimation, split­and­merge tree, opti­ mization, maintenance models, age replacement poli­ cies Abstract We a consider a replacement policy based on age thresholds, for a multicomponent system. We want

  9. Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement Project

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement the current taphole replacement problem Use advanced decision-making tools to select an optimal concept to be manufactured An SOP was created that standardized the taphole replacement process and reduced overall

  10. Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton

    E-Print Network [OSTI]

    Rudnick, Roberta L.

    Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton Shan and was replaced by more fertile lithospheric mantle sometime after the Paleozoic. Moreover, lithospheric mantle crust (2700 Ma), suggesting that the original Archean lithosphere was replaced in the Proterozoic

  11. Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network

    E-Print Network [OSTI]

    Chan, Edward

    Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network dynamically. Most existing cache strategies perform replacement independently, and they seldom consider coordinated replacement and energy saving issues in the context of a mobile ad hoc network. In this paper, we

  12. STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM

    E-Print Network [OSTI]

    STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-6R Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site Address: Enforcement Agency new or replacement duct systems in existing dwellings. For existing dwellings, a completely new

  13. Shake them all! Rethinking Selection and Replacement in MOEA/D

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Shake them all! Rethinking Selection and Replacement in MOEA/D Gauvain Marquet Bilel Derbel Arnaud-specific operators, and (iii) replace neighbors' solutions if the generated offspring is better. We remark is critical for an accurate explo- ration/exploitation balance. Moreover, the replacement mechanism (Step (iii

  14. Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA

    E-Print Network [OSTI]

    Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

  15. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01T23:59:59.000Z

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  16. FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and

    E-Print Network [OSTI]

    Kirschner, Denise

    FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

  17. Selecting renal replacement therapies: what do African American and non-African American patients and their families think others should know? A mixed methods study

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    making about renal replacement therapies. Qual Health ResOpen Access Selecting renal replacement therapies: what doneed to inform renal replacement therapy (RRT) decisions.

  18. Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis

    SciTech Connect (OSTI)

    Ammar, Thoraya [King's College Hospital, Department of Radiology (United Kingdom); Rio, Alan [King's College Hospital, Department of Dietetics (United Kingdom); Ampong, Mary Ann [King's College Hospital, Department of Neurosciences (United Kingdom); Sidhu, Paul S., E-mail: paulsidhu@nhs.ne [King's College Hospital, Department of Radiology (United Kingdom)

    2010-06-15T23:59:59.000Z

    Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

  19. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Columbia Univ., New York, NY (United States); Chen, Jingguang G. [Columbia Univ., New York, NY (United States); Brookhaven National Lab. (BNL), Upton, NY (United States); Chang, Kuan [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Wang, Tiefeng [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology

    2015-04-01T23:59:59.000Z

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  20. Polymeric materials replacement issues for the LANL stockpile.

    SciTech Connect (OSTI)

    Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

    2002-01-01T23:59:59.000Z

    A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

  1. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-04-01T23:59:59.000Z

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore »modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  2. Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

  3. atlanto-odontoid joint replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

  4. Rohm and Haas: Furnace Replacement Project Saves Energy and Improves Production at a Chemical Plant

    SciTech Connect (OSTI)

    Not Available

    2006-02-01T23:59:59.000Z

    This DOE Industrial Technologies Program spotlight describes how Rohm and Haas's Deer Park, Texas, chemical plant reduced natural gas usage and energy costs by replacing inefficient furnace equipment.

  5. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01T23:59:59.000Z

    implantation of heart valve prosthesis for the treatment ofF. Percutaneous aortic valve replacement: an experimentalA stentless trileaflet valve from a sheet of decellularized

  6. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04T23:59:59.000Z

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  7. Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor...

  8. Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access...

  9. Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

  10. Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2013 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

  11. Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...

    Broader source: Energy.gov (indexed) [DOE]

    7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

  12. Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...

    Broader source: Energy.gov (indexed) [DOE]

    12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

  13. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2002-01-01T23:59:59.000Z

    ). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

  14. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 – 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal M. Edward Rister... Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg...

  15. CX-004421: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Program. 1) Upgrade lighting and metal halide fixtures along Emma Street with light-emitting diode (LED) fixtures; 2) replace metal halide fixtures in Murphy and Hunt Parks; 3)...

  16. Model morphing and sequence assignment after molecular replacement

    SciTech Connect (OSTI)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States); Read, Randy J. [University of Cambridge, Cambridge Institute for Medical Research, Cambridge CB2 0XY (United Kingdom); Adams, Paul D. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Brunger, Axel T. [Stanford University, 318 Campus Drive West, Stanford, CA 94305 (United States); Afonine, Pavel V. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Hung, Li-Wei [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States)

    2013-11-01T23:59:59.000Z

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Ĺ and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ?) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  17. Frequently Asked Questions: If I lose my permit, how can I get a replacement?

    E-Print Network [OSTI]

    Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

  18. Frequently Asked Questions: If I lose my permit, how can I get a replacement?

    E-Print Network [OSTI]

    Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

  19. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02071 - REMOVAL # 0000-00 XXX A. Removal and disposal shall be performed in accordance with ap- plicable State 02071 - 2 (Rev. 9/00) #12;Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX 1

  20. Project Profile: Halide and Oxy-Halide Eutectic Systems for

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 | DepartmentEnergy MITis PV

  1. Agents for replacement of NAD+/NADH system in enzymatic reactions

    DOE Patents [OSTI]

    Fish, Richard H.; Kerr, John B.; Lo, Christine H.

    2004-04-06T23:59:59.000Z

    Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

  2. Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana

    E-Print Network [OSTI]

    Poche', J. M.; Broussard, J. P.

    1998-01-01T23:59:59.000Z

    INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332... chillers. The Hospital had been monitoring the CFC issue for the past several years, and felt it was time to begin replacing its 30 year old machines. The Hospital's original plan at the time of budgeting was a one-forane replacement of chillers...

  3. Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it!

    E-Print Network [OSTI]

    Evans, Paul G.

    Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it! Item Description Price DNA Optical discount on these items.** #12;Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact

  4. Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH AFFIDAVIT OF NON-USE OF ASBESTOS Project: Roof Replacement and Related Work at LIBRARY OF SCIENCE & MEDICINE

  5. Fluorination of the cyanogen halides

    E-Print Network [OSTI]

    Ward, Raymond Anthony

    1960-01-01T23:59:59.000Z

    A Thesis Sy Raymond Anthony Ward Approved as to styl and content byt ~ rmen o o e c ~ ea o spar men A~act Some cyanogen halldee were fluorinated under varloua condltlona, and th? producte analyaed to deterelne th? couree of reaction. F...

  6. Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa

    E-Print Network [OSTI]

    Thomas, Valerie

    (MTBE) as strategies for replacing lead additives. The message to both audiences is the potential to increase production of aromatic and alkylated hydrocarbons, or to use the additive MTBE. The additional

  7. Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis

    E-Print Network [OSTI]

    Phillips, J.

    1998-01-01T23:59:59.000Z

    In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

  8. Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement 

    E-Print Network [OSTI]

    Park, Yong Tae

    2012-07-16T23:59:59.000Z

    Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

  9. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    and J. D. Puskas. Mitral-valve repair versus replacement forbioprosthetic heart valves. Ann. Thorac. Surg. 71:S417–mechanics of arti?cial heart valves. Clin. Exp. Pharmacol.

  10. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    toronto stentless porcine valve. Ann. Thorac. Surg. 78:2076–medical mechanical cardiac valve prosthesis. Ann. Thorac.or surgical aortic-valve replacement. New Engl. J. Med. 366:

  11. 1 (blue. The orange problem is the same with 999 replaced by 555 ...

    E-Print Network [OSTI]

    2012-10-30T23:59:59.000Z

    1 (blue. The orange problem is the same with 999 replaced by 555). (a) Number of solutions (999+2. 2. ) Number of solutions with x = y = z. 1. (x = y = z = 333).

  12. Variation in joint fluid composition and its effect on the tribology of replacement joint articulation

    E-Print Network [OSTI]

    Mazzucco, Daniel Clarke, 1976-

    2003-01-01T23:59:59.000Z

    Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

  13. Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the...

  14. Development of a low fat wheat tortilla: optimization of lipids, emulsifiers, and fat replacers

    E-Print Network [OSTI]

    Dollak, Christina

    1993-01-01T23:59:59.000Z

    (DATEM). Finally, tortillas were made with commercially available, carbohydrate-based fat replacers: potato maltodextrins, tapioca maltodextrins, pregelatinized rice flour, modified rice solids, and pea starch. Dough water absorption, mixing time...

  15. Guideline for the seismic technical evaluation of replacement items for nuclear power plants

    SciTech Connect (OSTI)

    Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

    1993-02-01T23:59:59.000Z

    Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

  16. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01T23:59:59.000Z

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  17. Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana 

    E-Print Network [OSTI]

    Poche', J. M.; Broussard, J. P.

    1998-01-01T23:59:59.000Z

    converted to a gas-fired chiller in their chiller replacement program The analysis phase also included negotiating rates with the electric and gas companies servicing the Hospital. The utility history and equipment inventory was pesformed utilizing a...INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332...

  18. Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming Ouhyoung ( )

    E-Print Network [OSTI]

    Ouhyoung, Ming

    Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming In this paper, we present a practical and complete system for plausible face replacement of videos. In our system, we take two videos as inputs, and aim to replace the target human subject's face with an- other

  19. CAGE TRIALS USING AN ENDOGENOUS MEIOTIC DRIVE GENE IN THE MOSQUITO AEDES AEGYPTI TO PROMOTE POPULATION REPLACEMENT

    E-Print Network [OSTI]

    Severson, David

    POPULATION REPLACEMENT SUNG-JAE CHA, AKIO MORI, DAVE D. CHADEE, AND DAVID W. SEVERSON* Center for Tropical, West Indies Abstract. Control of arthropod-borne diseases based on population replacement into natural populations. Endogenous meiotic drive systems have strong and stable population replacement

  20. IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 10, NO. 4, AUGUST 2002 441 Efficient Randomized Web-Cache Replacement

    E-Print Network [OSTI]

    -Cache Replacement Schemes Using Samples From Past Eviction Times Konstantinos Psounis, Student Member, IEEE, and Balaji Prabhakar, Member, IEEE Abstract--The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least

  1. 0-7803-7016-3/01/$10.00 2001 IEEE A Randomized Web-Cache Replacement Scheme

    E-Print Network [OSTI]

    Prabhakar, Balaji

    0-7803-7016-3/01/$10.00 ©2001 IEEE A Randomized Web-Cache Replacement Scheme Konstantinos Psounis@isl.stanford.edu Abstract-- The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least recently used document" performs poorly

  2. Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring

    E-Print Network [OSTI]

    Ryan, Sarah M.

    1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi-Markov process, threshold replacement policy, sensitivity analysis SUMMARY This paper deals with the optimal

  3. Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P. Kharoufeh2 Lisa M. Maillart3

    E-Print Network [OSTI]

    Kharoufeh, Jeffrey P.

    Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P a stochastically degrading system using preventive and reactive replacements. The system's rate of degradation expected discounted cost of preventively and reactively replacing such a system over an infinite planning

  4. Improving Replacement Decisions in SetAssociative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Improving Replacement Decisions in Set­Associative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg Computer Science Department, University of Massachusetts, Amherst ABSTRACT Cache replacement policies play a key role in determining hit rates in set­associative caches. Cache replacement algorithms

  5. UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond)

    E-Print Network [OSTI]

    Frank, Thomas D.

    UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond) STUDENT'S NAME STUDENT'S COLLEGE STUDENT'S UIN Under the Grade Replacement Policy for a repeated course, I request permission to replace the grade in the course listed below. I

  6. A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

  7. An Eye for an Eye: A Single Camera Gaze-Replacement Method The Blavatnik School of Computer Science

    E-Print Network [OSTI]

    Wolf, Lior

    An Eye for an Eye: A Single Camera Gaze-Replacement Method Lior Wolf The Blavatnik School an effective so- lution to this problem that is based on replacing the eyes of the user. This replacement, when is asked to look straight at the camera. We store these frames,then track the eyes accurately in the video

  8. Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma

    E-Print Network [OSTI]

    Dupont, Pierre

    Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

  9. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01T23:59:59.000Z

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

  10. U.S. Department of Energy NEPA Categorical Exclusion Determination...

    Broader source: Energy.gov (indexed) [DOE]

    Action or Project Description 1) Replacement of the metal-halide lighting with light-emitting diode energy efficient lighting in the two multi- floor buildings constituting the...

  11. CX-002106: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    and Renewable Energy 1) Replacement of the metal-halide lighting with light-emitting diode energy efficient lighting in the two multi-floor buildings constituting the...

  12. CX-004962: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    halide light fixtures in the City Hall and Community Center parking lots with light-emitting diode (LED) light fixtures; and 3) replace incandescent light bulbs on traffic...

  13. Data:B9cfcf3e-e2d7-48de-9d6c-f4f190e17797 | Open Energy Information

    Open Energy Info (EERE)

    schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide...

  14. Data:2d616a7c-22e4-427e-91c6-c1eebd3a9a7d | Open Energy Information

    Open Energy Info (EERE)

    schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide...

  15. Data:12819b61-8fb8-4289-afae-af2425c7504d | Open Energy Information

    Open Energy Info (EERE)

    schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide...

  16. Data:A57c88dc-6b41-4d79-9187-6f171bb5c02f | Open Energy Information

    Open Energy Info (EERE)

    schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide...

  17. Data:85cfbd33-bef5-4bdc-b995-d9fd9fb85e4d | Open Energy Information

    Open Energy Info (EERE)

    schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide...

  18. U.S. Department of Energy National Environmental Policy Act categorica...

    Broader source: Energy.gov (indexed) [DOE]

    Act: Proposed Action or Project Description 1) Develop and install solar photovoltaic system on the roof of City Hall; 2) replace metal halide light fixtures in the City...

  19. A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2

    E-Print Network [OSTI]

    Bertini, Robert L.

    A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2 3 Jesse operational3 and maintenance (O&M) per-mile costs increase as buses age. From a purely economic4 perspective, there is a cost tradeoff between the lower O&M costs of newer fleets and their5 higher initial capital costs

  20. Analysis of the Repair vs. Replace Decision for Small AC Motors

    E-Print Network [OSTI]

    Chamberlain, P. F.

    1984-01-01T23:59:59.000Z

    This morning in the course of my discussion, I would like to cover how we at Westvaco were handling our motor replacement decisions, how we are handling them now and how we determined the costs and benefits of such a change. As you have already...

  1. Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage--Hybrid electrical energy storage systems (HEES) are comprised of multiple banks of inhomogeneous EES elements storage device, i.e., high energy capacity, high output power level, low self-discharge, low cost

  2. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01T23:59:59.000Z

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  3. II MODEL AND FEEDBACK LINEARIZING CONTROLLER 1 A Multilayer Perceptron Replaces a Feedback

    E-Print Network [OSTI]

    Amaral, José Nelson

    II MODEL AND FEEDBACK LINEARIZING CONTROLLER 1 A Multilayer Perceptron Replaces a Feedback Linearization Controller in a Nonlinear Servomechanism Jos'e F. Haffner, Ney T. Meyrer, Jos'e N. Amaral and Lu'is F. A. Pereira Abstract--- A Feedback Linearizing Controller (FLC) is used to train a multilayer

  4. Managing Inventory of Items with Replacement Wei Huang Vidhyadhar Kulkarni 1

    E-Print Network [OSTI]

    Kulkarni, Vidyadhar G.

    Managing Inventory of Items with Replacement Warranty Wei Huang Vidhyadhar Kulkarni 1 Jayashankar items under warranty. We model this setting as a multi-period single product inventory problem where that neglects warranty repairs. Keyword: Warranty, Inventory, Stochastic Demand, Information. 1 This work

  5. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect (OSTI)

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce (GSKNC)

    2014-08-13T23:59:59.000Z

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  6. CONTRIBUTED ARTICLE 117. Use of in situ Fiber-Optic Raman Spectroscopy to Replace

    E-Print Network [OSTI]

    Myrick, Michael Lenn

    CONTRIBUTED ARTICLE 117. Use of in situ Fiber-Optic Raman Spectroscopy to Replace Calorimetry. Abstract A method for real time determination of the percent cure of epoxies via in-situ fiber-optic Raman to be reliable to +/- 0.82% in the 40-90% cure range. Key words: Process monitoring, fiber optic, Raman

  7. IDD Ingest Relay Replacement in Support of the THREDDS/RAMADDA Server System at Penn State

    E-Print Network [OSTI]

    IDD Ingest Relay Replacement in Support of the THREDDS/RAMADDA Server System at Penn State Final/RAMADDA data provider since 2011. Recently, the equipment providing our IDD relay service (3 servers with Intel-processor Xeon E5606 2.13 GHz 64-bit machines running the LDM and Linux Virtual Server (LVS) in a virtual machine

  8. Review, reduce, and replace: The three `R's of energy security Larry Hughes

    E-Print Network [OSTI]

    Hughes, Larry

    ERG2007/01 Review, reduce, and replace: The three `R's of energy security Larry Hughes Energy: The three `R's of energy security 1 Abstract Rising world energy costs, increasing demand for energy contributed to national and international concerns over energy security. If a jurisdiction's energy security

  9. Reduced Energy and Maintenance Costs Using Polyurethane as a Replacement Roof System

    E-Print Network [OSTI]

    Scott, G. D.

    failures had occurred and resealing and reflashing penetrations. In many instances roof crews were unable to accomplish a permanent fix without a major tear-off and replacement of the existing roof. 40 ESL-HH-92-05-08 Proceedings of the Eighth...

  10. Replacement strategies to preserve useful diversity in steady-state genetic algorithms

    E-Print Network [OSTI]

    Granada, Universidad de

    as a serious failure mode for GAs [13,17]. Selective pressure and population diversity are inversely related]. Steady-state GAs (SSGAs) [42,49] usually only produce one or two offspring in each generation. Parents on generational GAs (which replace the entire population by the offspring population every generation) is because

  11. PRECAST REPLACEMENT OF CONCRETE PAVEMENT SLABS (Tollway) Effective: March 30, 2009

    E-Print Network [OSTI]

    PRECAST REPLACEMENT OF CONCRETE PAVEMENT SLABS (Tollway) Effective: March 30, 2009 Revised: October 19, 2012 DESCRIPTION. This work shall consist of the removal of existing concrete pavement, restoration of the subbase material, the installation of precast concrete pavement slabs in accordance

  12. [Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish a standard procedure for controlled access, securityOP 61.07 [Minor revision­posted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure employees required to perform operational #12;December 6, 2012 Page 2 OP 61.07 checks and maintenance

  13. [Minor revisionposted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish standards for traffic and parking control devices to ensureOP 61.18 [Minor revision­posted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure of Grounds Maintenance by August 1 of every year." b. The assistant vice president for operations

  14. [Minor revisionposted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish standards and guidelines for the use and selectionOP 61.14 [Minor revision­posted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure and issuance of keys, development of keying systems, standardization of hardware, and maintenance programs

  15. [Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revision­posted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

  16. The Replacement Operation for CCP Programs Marco Bertolino 1 , Sandro Etalle 2 , and Catuscia Palamidessi 3

    E-Print Network [OSTI]

    Palamidessi, Catuscia

    University catuscia@cse.psu.edu Abstract. The replacement is a very powerful transformation opera­ tion which common transformation operations such as unfold, fold, switching, distribution. Because of optimization techniques. To this end, while there exists a history and a wide literature on transformations

  17. Towards Reliable Scheduling Schemes for Long-lived Replaceable Sensor Networks

    E-Print Network [OSTI]

    Wang, Guiling

    . For example, the amount of energy that a solar cell can harvest is proportional to its surface area, but it is infeasible to equip a tiny sensor node with a large-size solar cell, besides the amount of available solar in realizing the strategy is how to minimize the system maintenance cost, especially the frequency in replacing

  18. Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks

    E-Print Network [OSTI]

    Vokkarane, Vinod M.

    1 Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks Sachin consider the problem of maintaining a minimum threshold-coverage in a wireless sensor network, while to maintain threshold-coverage in wireless sensor networks. These policies assess the candidature of each

  19. Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without Underfill

    E-Print Network [OSTI]

    Swaminathan, Madhavan

    Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without nano-structured nickel as the primary interconnection material. Assembly was accomplished materials such as nanostructured copper and nickel, novel bonding and barrier layers to provide both

  20. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02072 - REMOVAL OF INTACT INCIDENTAL ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS Roof System Components Chart" for location of asbestos containing roofing materials. 1.2 SUMMARY A

  1. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Sharma, A; Yang, D; Chen, G; Ban, Y; Li, Q

    2015-01-01T23:59:59.000Z

    Modern gas detectors for detection of particles require F-based gases for optimal performance. Recent regulations demand the use of environmentally unfriendly F-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  2. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Yang, D; Chen, G; Ban, Y; Li, Q; Sharma, A

    2015-01-01T23:59:59.000Z

    Modern gas detectors for detection of particles require F-based gases for op- timal performance. Recent regulations demand the use of environmentally un- friendly Freon-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  3. 5/8/2014 Page 1 Fill a Temporary Position to Replace an Employee on Leave

    E-Print Network [OSTI]

    Habib, Ayman

    of the replacement is greater than 6 months, enter 006 ­ Tempoary Relief. Enter the Length of Term which Positioned Job ­ No Change. Enter Position Information 3. Enter the Position Number of the role you are looking to fill NOTE! If you do not know the Position Number, you can use the Look Up button and search

  4. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01T23:59:59.000Z

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  5. GREEN LIVING Replace incandencent and halogen light bulbs with LED and CLFs

    E-Print Network [OSTI]

    Thaxton, Christopher S.

    GREEN LIVING GUIDE ENERGY TRAVEL FOOD sustain yosef WATER Replace incandencent and halogen light for your laundry RESIST THAT SWITCH! Use natural light during the day, and no lights when you are gone USE MORE THAN YOU CAN EAT, reduce your waste stream DRINK FAIR TRADE COFFEE - Check out Conrad

  6. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  7. Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule

    E-Print Network [OSTI]

    Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule and balance depend upon hair cells, the sensory receptors of the inner ear. Millions of people suffer from hearing and balance deficits caused by damage to hair cells as a result of exposure to noise

  8. Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after

    E-Print Network [OSTI]

    Rubel, Edwin

    Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard developed a transgenic mouse to permit conditional and selective ablation of hair cells in the adult mouse

  9. Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received.

    E-Print Network [OSTI]

    Saskatchewan, University of

    Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received. Note: The replacement diploma is produced with a replacement note on the reverse side. There is a fee of $50 for a replacement parchment. DELIVERY INSTRUCTIONS

  10. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect (OSTI)

    Noel Duckwtiz

    2011-05-01T23:59:59.000Z

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

  11. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH in sufficient de- tail to facilitate continued evaluation of Applications for Payment and progress reports of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH b. Submittals. c

  12. COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer

    E-Print Network [OSTI]

    Qian, Ning

    COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer replacement up to $1,300. The funding will be approved only if the faculty member has not purchased a computer with start-up, research, FRAP or other funds (including Computer

  13. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  14. Development of Replacements for Phoscoating Used in Forging, Extrusion and Metal Forming Processes

    SciTech Connect (OSTI)

    Kerry Barnett

    2003-03-01T23:59:59.000Z

    Many forging, extrusion, heading and other metal forming processes use graphite-based lubricants, phosphate coatings, and other potentially hazardous or harmful substances to improve the tribology of the metal forming process. The application of phosphate-based coatings has long been studied to determine if other synthetic ''clean'' lubricants could provide the same degree of protection afforded by phoscoatings and its formulations. So far, none meets the cost and performance objectives provided by phoscoatings as a general aid to the metal forming industry. In as much as phoscoatings and graphite have replaced lead-based lubricants, the metal forming industry has had previous experience with a legislated requirement to change processes. However, without a proactive approach to phoscoating replacement, many metal forming processes could find themselves without a cost effective tribology material necessary for the metal forming process

  15. Evaluation of replacement thread lubricants for red lead and graphite in mineral oil

    SciTech Connect (OSTI)

    Jungling, T.L.; Rauth, D.R.; Goldberg, D.

    1998-04-30T23:59:59.000Z

    Eight commercially available thread lubricants were evaluated to determine the best replacement for Red Lead and Graphite in Mineral Oil (RLGMO). The evaluation included coefficient of friction testing, high temperature anti-seizing testing, room temperature anti-galling testing, chemical analysis for detrimental impurities, corrosion testing, off-gas testing, and a review of health and environmental factors. The coefficient of friction testing covered a wide variety of factors including stud, nut, and washer materials, sizes, manufacturing methods, surface coatings, surface finishes, applied loads, run-in cycles, and relubrication. Only one lubricant, Dow Corning Molykote P37, met all the criteria established for a replacement lubricant. It has a coefficient of friction range similar to RLGMO. Therefore, it can be substituted directly for RLGMO without changing the currently specified fastener torque values for the sizes, materials and conditions evaluated. Other lubricants did not perform as well as Molykote P37 in one or more test or evaluation categories.

  16. Why Insertion Turbine Meters are Replacing Orifice Plates for Steam Flow Measurement

    E-Print Network [OSTI]

    Rusnak, J. J.

    1983-01-01T23:59:59.000Z

    WHY INSERTION TURBINE MBTBRS A E REPLACING ORIFICE PLATES FOR STEAM FLOW MEASURE ENT J. J. Rusnak Engineering Measurements Company Longmont, Colorado ABSTRACT Flow measurement is a complex and application related discipline. It borders... to be instrumented quickly, economically and without dis rupting production; and further, these meters had to be accurate in order to be useful in making energy saving decisions. Thus, the entry of the insertion turbine meter for steam in 1975. Since then it has...

  17. A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED

    SciTech Connect (OSTI)

    Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

    2011-02-23T23:59:59.000Z

    The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

  18. phenix.mr_rosetta: a new tool for difficult molecular replacement problems

    SciTech Connect (OSTI)

    Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

    2011-01-12T23:59:59.000Z

    The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

  19. Percutaneous Valve Replacement: Significance of Different Delivery Systems In Vitro and In Vivo

    SciTech Connect (OSTI)

    Attmann, Tim; Lutter, Georg, E-mail: lutter@kielheart.uni-kiel.de; Quaden, Rene [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Jahnke, Thomas [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany); Rumberg, Kristin; Cremer, Jochen [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Muller-Hulsbeck, Stefan [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany)

    2006-06-15T23:59:59.000Z

    Background and purpose. Percutaneous heart valve replacement is an exciting growing field in cardiovascular medicine yet still with some major problems. Only sophisticated improvement of the instruments could make it a real alternative to conventional surgery. Therefore, the aim of this study was to evaluate different delivery devices for percutaneous heart valve replacement in vitro and in vivo. Methods. A catheter prototype designed by our group, and two commercially available devices for the delivery of esophageal stents and aortic endoprostheses, were tested. After in vitro experiments, an ovine animal model of transfemoral pulmonary valve implantation was established using biological valved self-expanding stents. Only the delivery device for aortic endografts (Medtronic, Talent, Santa Rosa, CA, USA) allowed fast in vitro procedures without material fatigue. This device was chosen for the in vivo tests. Results. Technical success was achieved in 9 of 10 animals (90%). One animal died after perforation of the ventricular wall. Orthotopic pulmonary placement was performed in 6 animals and intentional supravalvular valved stent placement in 3 animals. Conclusions. An adequate in vitro model for this evolving field of interventional heart valve replacement is presented. Furthermore, the present study pinpoints the key characteristics that are mandatory for a delivery system in percutaneous pulmonary valve implantation. With regard to the delivery device's ductility observed during this 'venous' study, an approach to transfemoral aortic valve implantation seems feasible.

  20. HIGH INTENSITY DISCHARGE (HID) SOLID STATE BALLAST PROGRAM PHASE I FINAL REPORT

    E-Print Network [OSTI]

    Ailing, W.R.

    2013-01-01T23:59:59.000Z

    A trapazoid for each type and lamp wattage is published bylamp wattage for the core-coil ballast was measured with a dynamometer type

  1. HIGH INTENSITY DISCHARGE (HID) SOLID STATE BALLAST PROGRAM PHASE I FINAL REPORT

    E-Print Network [OSTI]

    Ailing, W.R.

    2013-01-01T23:59:59.000Z

    change in the output power for the solid state ballast asof the solid state ballast's constant output power withswitching power supplies such as the solid state ballast.

  2. Crystal structure and magnetic properties of two new cobalt selenite halides: Co{sub 5}(SeO{sub 3}){sub 4} X {sub 2} (X=Cl, Br)

    SciTech Connect (OSTI)

    Becker, Richard [Department of Inorganic Chemistry, Stockholm University, S-106 91 Stockholm (Sweden)], E-mail: richard@inorg.su.se; Prester, Mladen [Institute of Physics, P.O. Box 304, HR-10000 Zagreb (Croatia); Berger, Helmuth [Institut de Physique de la Matiere Complexe, Ecole Polytechnique Federale de Lausanne, CH-1015 Lausanne (Switzerland); Hui Lin, Ping [Institut de Physique de la Matiere Complexe, Ecole Polytechnique Federale de Lausanne, CH-1015 Lausanne (Switzerland); Institute of Physics, Academia Sinica Nankang, Taipei 11529, Taiwan, ROC (China); Johnsson, Mats [Department of Inorganic Chemistry, Stockholm University, S-106 91 Stockholm (Sweden); Drobac, Djuro [Institute of Physics, P.O. Box 304, HR-10000 Zagreb (Croatia); Zivkovic, Ivica [Institute of Physics, P.O. Box 304, HR-10000 Zagreb (Croatia)

    2007-03-15T23:59:59.000Z

    Two new isostructural cobalt selenite halides Co{sub 5}(SeO{sub 3}){sub 4}Cl{sub 2} and Co{sub 5}(SeO{sub 3}){sub 4}Br{sub 2} have been synthesized. They crystallize in the triclinic system space group P-1 with the following lattice parameters for Co{sub 5}(SeO{sub 3}){sub 4}Cl{sub 2}: a=6.4935(8) A, b=7.7288(8) A, c=7.7443(10) A, {alpha}=66.051(11){sup o}, {beta}=73.610(11){sup o}, {gamma}=81.268(9){sup o}, and Z=1. The crystal structures were solved from single-crystal X-ray data, R1=3.73 and 4.03 for Co{sub 5}(SeO{sub 3}){sub 4}Cl{sub 2} and Co{sub 5}(SeO{sub 3}){sub 4}Br{sub 2}, respectively. The new compounds are isostructural to Ni{sub 5}(SeO{sub 3}){sub 4}Br{sub 2}. Magnetic susceptibility measurements on oriented single-crystalline samples show anisotropic response in a broad temperature range. The anisotropic susceptibility is quantitatively interpreted within the zero-field splitting schemes for Co{sup 2+} and Ni{sup 2+} ions. Sharp low-temperature susceptibility features, at T {sub N}=18 and 20 K for Co{sub 5}(SeO{sub 3}){sub 4}Cl{sub 2} and Co{sub 5}(SeO{sub 3}){sub 4}Br{sub 2}, respectively, are ascribed to antiferromagnetic ordering in a minority magnetic subsystem. In isostructural Ni{sub 5}(SeO{sub 3}){sub 4}Br{sub 2} magnetically ordered subsystem represents a majority fraction (T {sub N}=46 K). Nevertheless, anisotropic susceptibility of Ni{sub 5}(SeO{sub 3}){sub 4}Br{sub 2} is dominated at low temperatures by a minority fraction, subject to single-ion anisotropy effects and increasing population of S{sub z} =0 (singlet) ground state of octahedrally coordinated Ni{sup 2+}. - Graphical abstract: Two new iso-structural cobalt selenite halides Co{sub 5}(SeO{sub 3}){sub 4}Cl{sub 2} and Co{sub 5}(SeO{sub 3}){sub 4}Br{sub 2} have been synthesized which are iso-structural to Ni{sub 5}(SeO{sub 3}){sub 4}Br{sub 2}. Magnetic susceptibility measurements on oriented single-crystalline samples show anisotropic response in a broad temperature range, revealing significant single-ion anisotropy effects.

  3. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01T23:59:59.000Z

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

  4. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect (OSTI)

    David E. Korns

    2012-05-01T23:59:59.000Z

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  5. Replacement of the old Mass Storage System by a solution that supports the scientific and operational developments over the next 10 years

    E-Print Network [OSTI]

    Haak, Hein

    Replacement of the old Mass Storage System by a solution that supports the scientific of the old obsolete Mass Storage. Replace the Mass Storage System of the KNMI Provide sufficient storage

  6. LED Lamp Project Lights the Way to Flicker-Free Replacement Jade Sky Technologies and UC Davis's California Lighting Technology Center demonstrate the

    E-Print Network [OSTI]

    California at Davis, University of

    LED Lamp Project Lights the Way to Flicker-Free Replacement Jade Sky the flicker and dimming requirements set by the Voluntary California Quality LED Lamp for incentivized LED replacement lamps. These criteria go beyond energy efficiency

  7. Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

    2012-09-01T23:59:59.000Z

    This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

  8. Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurringSteamDepartment ofStudy: Algae Could Replace

  9. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0Energy Replacing the

  10. Blythe-Knob\t161-kV\tTransmission\tLine Cross\tArm\tReplacements\t...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Blythe-Knob 161-kV Transmission Line Cross Arm Replacements - Continuation Sheet Project Description (continued) The wood cross arms on a number of wood H-frame structures have...

  11. Dynamic Total-Order Broadcast Protocol Replacement Emili Miedes De Elias, Francesc D. Mu~noz-Escoi

    E-Print Network [OSTI]

    Muńoz, Francesc

    Dynamic Total-Order Broadcast Protocol Replacement Emili Miedes De El´ias, Francesc D. Mu~noz-Esco. Mu~noz-Esco´i Instituto Universitario Mixto Tecnol´ogico de Inform´atica Universidad Polit´ecnica de

  12. A decision-making framework to determine the value of on-orbit servicing compared to replacement of space telescopes

    E-Print Network [OSTI]

    Baldesarra, Mark

    2007-01-01T23:59:59.000Z

    The Hubble Space Telescope has demonstrated that on-orbit servicing can provide significant benefits for scientific space programs. Specifically, servicing missions can replace failed components to keep spacecraft operational, ...

  13. Potential commercial application of a bi-layer bone-ligament regeneration scaffold to anterior cruciate ligament replacement

    E-Print Network [OSTI]

    Li, Jessica C. (Jessica Ching-Yi)

    2006-01-01T23:59:59.000Z

    A business model was created in order to explore the commercial application of a bi-layer bone-ligament scaffold to the treatment of torn anterior cruciate ligaments (ACL) requiring replacement. The two main keys in producing ...

  14. Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c

    SciTech Connect (OSTI)

    Not Available

    2010-10-01T23:59:59.000Z

    This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  15. Journal of the National Cancer Institute, Vol. 98, No. 18, September 20, 2006 ARTICLES 1311 Background: Unopposed estrogen replacement therapy is

    E-Print Network [OSTI]

    Pennsylvania, University of

    Background: Unopposed estrogen replacement therapy is associated with increased risk of endometrial cancer replacement therapy use and SULT1A1*2 genotype: the SULT1A1*2 allele and long-term use of estrogen replacement OR = 3.85, 95% CI = 1.48 to 10.00) than that of the SULT1A1*2 allele and no estrogen replacement therapy

  16. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  17. Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by

    E-Print Network [OSTI]

    Swaddle, John

    Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by the student. To request a replacement diploma, please complete this form and send, VA 23187-8795 (757) 221-2800 Fax: (757) 221-2151 registrar@wm.edu REPLACEMENT DIPLOMA REQUEST FORM

  18. 3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan-Chang Wang

    E-Print Network [OSTI]

    Ouhyoung, Ming

    3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan and important topic. In this paper, we present a system for face replacement in video. Most digital processing software can perform face replacement only when the poses for the source and target faces are similar

  19. 1. Those whom studied the most had the highest scores on the final exam. A. "Whom" should be replaced with "who."

    E-Print Network [OSTI]

    Rock, Chris

    in agriculture is the best weapons against hunger and poverty." A. "Investments" should be replaced with "investing." B. The comma after "poverty" should go on the outside of the quotation mark. C. "Weapons" should be replaced with "weapon." D. "Is" should be replaced with "Are." E. The sentence is correct as written. 3

  20. Significance of analog instrumentation - design philosophy of replacement dump arrest unit at Pickering Station Candu Reactor

    SciTech Connect (OSTI)

    Miller, J.F.; McDowell, R.W. [GAMMA-METRICS, San Diego, CA (United States)

    1996-12-31T23:59:59.000Z

    This paper discusses the differences of opinion concerning power plant instrumentation, including safety systems. One popular view point is that modem instrumentation must be microprocessor-based to be acceptable. An alternative view point is that properly designed analog instrumentation is recommended in some applications and has proven to be viable based upon performance and experience. A practical example is discussed in detail, explaining how a combination of discrete analog circuitry, combined with discrete digital circuitry provides a robust solution to a complex instrumentation replacement problem. In this application, a microprocessor-based instrument was designed as a replacement for an obsolete analog instrument. Due to severe licensing difficulties, the instrument was redesigned as a combination of discrete analog and digital circuitry. In the implementation of this circuitry, all complex testing functions of the improved microprocessor-based instrument were accommodated and system accuracy and performance were not compromised over the micro-processor-based instrument. The instrument has met all requirements for reliability and EMI/RFI susceptibility, as well as isolation of analog outputs and the ability to withstand severe transient noise on inputs and outputs without adversely affecting performance.

  1. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04T23:59:59.000Z

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  2. Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-05-01T23:59:59.000Z

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  3. Ligand placement based on prior structures: the guided ligand-replacement method

    SciTech Connect (OSTI)

    Klei, Herbert E. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Moriarty, Nigel W., E-mail: nwmoriarty@lbl.gov; Echols, Nathaniel [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Terwilliger, Thomas C. [Los Alamos National Laboratory, Los Alamos, NM 87545-0001 (United States); Baldwin, Eric T. [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Natural Discovery LLC, Princeton, NJ 08542-0096 (United States); Pokross, Matt; Posy, Shana [Bristol-Myers Squibb, Princeton, NJ 08543-4000 (United States); Adams, Paul D. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); University of California at Berkeley, Berkeley, CA 94720-1762 (United States)

    2014-01-01T23:59:59.000Z

    A new module, Guided Ligand Replacement (GLR), has been developed in Phenix to increase the ease and success rate of ligand placement when prior protein-ligand complexes are available. The process of iterative structure-based drug design involves the X-ray crystal structure determination of upwards of 100 ligands with the same general scaffold (i.e. chemotype) complexed with very similar, if not identical, protein targets. In conjunction with insights from computational models and assays, this collection of crystal structures is analyzed to improve potency, to achieve better selectivity and to reduce liabilities such as absorption, distribution, metabolism, excretion and toxicology. Current methods for modeling ligands into electron-density maps typically do not utilize information on how similar ligands bound in related structures. Even if the electron density is of sufficient quality and resolution to allow de novo placement, the process can take considerable time as the size, complexity and torsional degrees of freedom of the ligands increase. A new module, Guided Ligand Replacement (GLR), was developed in Phenix to increase the ease and success rate of ligand placement when prior protein–ligand complexes are available. At the heart of GLR is an algorithm based on graph theory that associates atoms in the target ligand with analogous atoms in the reference ligand. Based on this correspondence, a set of coordinates is generated for the target ligand. GLR is especially useful in two situations: (i) modeling a series of large, flexible, complicated or macrocyclic ligands in successive structures and (ii) modeling ligands as part of a refinement pipeline that can automatically select a reference structure. Even in those cases for which no reference structure is available, if there are multiple copies of the bound ligand per asymmetric unit GLR offers an efficient way to complete the model after the first ligand has been placed. In all of these applications, GLR leverages prior knowledge from earlier structures to facilitate ligand placement in the current structure.

  4. Calculation of dose rates during replacement of the 3CL seal tube in the FFTF IEM cell

    SciTech Connect (OSTI)

    Nelson, J.V.

    1997-11-12T23:59:59.000Z

    In September 1996, the seal tube at the 3CL window of the Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) failed. Replacement of the seal tube required removing the 3CL master slave manipulator (MSM) and shielding creating a streaming path for radiation from irradiated fuel and activated hardware in the IEM Cell. As a part of the preparation for the seal tube replacement, expected dose rates in the IEM Cell gallery outside the open 3CL penetration during the repair work were evaluated.

  5. Radiological Assessment of Steam Generator Removal and Replacement: Update and Revision

    SciTech Connect (OSTI)

    Hoenes, G. R.; Mueller, M. A.; McCormack, W. D.

    1980-12-01T23:59:59.000Z

    A previous analysis of the radiological impact of removing and replacing corroded steam generators has been updated based on experience gained during steam generator repairs at Surry Unit 2. Some estimates of occupational doses involved in the operation have been revised but are not significantly different from the earlier estimates. Estimates of occupational doses and radioactive effluents for new tasks have been added. Health physics concerns that arose at Surry included the number of persons involved in the operation, tne training of workers, the handling of quantitites.of low-level waste, and the application of the ALARA principle. A review of these problem areas may help in the planning of other similar operations. A variety of processes could be used to decontaminate steam generators. Research is needed to assess these techniques and their associated occupational doses and waste volumes. Contaminated steam generators can be stored or disposed of after removal without significant radiological problems. Onsite storage and intact shipment have the least impact. In-placing retubing, an alternative to steam generator removal, results in occupational doses and effluents similar to those from removal, but prior decontamination of the channel head is needed. The retubing option should be assessed further.

  6. Synthesis and casting of a lithium-bismuth compound for an ion-replacement electrorefiner.

    SciTech Connect (OSTI)

    McDeavitt, S. M.

    1998-11-23T23:59:59.000Z

    The intermetallic compound Li{sub 3}Bi played an integral part in the demonstration of an ion replacement electrorefining method developed at Argonne National Laboratory. The Li{sub 3}Bi compound was generated in a tilt-pour casting furnace using high-purity lithium and bismuth metals as the initial charge. At first, small-scale ({approximately}20 g) experiments were conducted to determine the materials synthesis parameters. In the end, four larger-scale castings (500 g to 1250 g) were completed in a tantalum crucible. The metals were heated slowly to melt the charge, and the formation reaction proceeded vigorously above the melting point of bismuth ({approximately}270 C). For the large-scale melts, the furnace power was temporarily turned off at this point. After several minutes, the tantalum crucible stopped glowing, and the furnace power was turned on. The temperature was then increased to {approximately}1200 C to melt and homogenize the compound, and liquid Li{sub 3}Bi was cast into cold stainless steel molds. Approximately 3.7 kg of Li{sub 3}Bi was generated by this method.

  7. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01T23:59:59.000Z

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  8. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01T23:59:59.000Z

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  9. Hydrothermal alteration in the EPF replacement wells, Olkaria Geothermal field, Kenya

    SciTech Connect (OSTI)

    Mungania, J. [Kenya Power & Lighting Co. Ltd., Naivasha (Kenya)

    1996-12-31T23:59:59.000Z

    Olkaria Geothermal area is located in the central sector of the Kenya, Rift Valley. A 45MW Geothermal power station has been operational at Olkaria since 1985 supplied by 22 of the 26 wells drilled in the Eastern production field (EPF). Between 1988 and 1993, eight more wells referred to as {open_quote}replacement wells{close_quote} were drilled in the same field to boost steam supply to the station. Petrographic analyses of the drill cuttings is usually done to determine detail stratigraphy of the field, extends of hydrothermal activity, subsurface structures and other parameters which may influence production potential of a well. Analyses of the drill cuttings from the EPF wells show that: Variations in the whole rock alteration intensities correlate with differences in rocktypes. Permeable horizons, especially the productive feeder zones are well marked by enhanced hydrothermal minerals depositions, mainly quartz, calcite, pyrite and epidote. Other aspects of state of reservoir like boiling are signified by presence of bladed calcite.

  10. Further Investigations of the Effect of Replacing Lithium by Sodium on Lithium Silicate Scintillating Glass Efficiency

    SciTech Connect (OSTI)

    Bliss, Mary; Aker, Pamela M.; Windisch, Charles F.

    2012-02-15T23:59:59.000Z

    Ce3+ doped lithium (6Li) silicate glasses are thermal neutron detectors. Prior work showed that when sodium (Na) is substituted for Li the scintillation efficiency, under beta particle stimulation, increased and then decreased as the sodium (Na) content was increased [1]. When all the 6Li was replaced by Na no scintillation was observed. Raman spectra, acquired using a visible excitation source provided no evidence of anomalous behavior. SEM microscopy did show some phase separation, but there was no obvious correlation with the scintillation efficiency. We have reexamined these glass samples using deep UV Raman excitation which reduces fluorescence interference. The newly acquired spectra show evidence of phase separation in the glasses. Specifically we see a peak at 800 cm-1 Raman shift which can be assigned to a vitreous silica moiety that results from phase separation. There is a strong correlation between this peak's area, the scintillation efficiency, and the Na content. The observed trend suggests that phase separation enhances scintillation and addition of Na reduces the amount of phase separation. We also see evidence of at least two defect structures that can be tentatively assigned to a three-membered ring structure and an oxygen vacancy. The latter is fairly strongly correlated with enhanced scintillation efficiency.

  11. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  12. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  13. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  14. Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine

    DOE Patents [OSTI]

    Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

    2002-01-01T23:59:59.000Z

    The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

  15. An OpenGL backend for Halide

    E-Print Network [OSTI]

    Chornay, Nicholas J

    2013-01-01T23:59:59.000Z

    High performance image processing requires not only an efficient underlying algorithm but also an implementation tailored to maximally exploit the available hardware resources. In practice, this requires low-level optimization, ...

  16. Still Photography Throwdown: Silver Halide vs. Silicon

    E-Print Network [OSTI]

    Fairchild, Mark D.

    , or are they just more convenient and flexible? · Consumer/Prosumer Applications #12;Motivation #12;Systems · Film

  17. Chemistry of lower valent actinide halides

    SciTech Connect (OSTI)

    Lau, K.H.; Hildenbrand, D.L.

    1992-01-01T23:59:59.000Z

    This research effort was concerned almost entirely with the first two members of the actinide series, thorium and uranium, although the work was later extended to some aspects of the neptunium-fluorine system in a collaborative program with Los Alamos National Laboratory. Detailed information about the lighter actinides will be helpful in modeling the properties of the heavier actinide compounds, which will be much more difficult to study experimentally. In this program, thermochemical information was obtained from high temperature equilibrium measurements made by effusion-beam mass spectrometry and by effusion-pressure techniques. Data were derived primarily from second-law analysis so as to avoid potential errors in third-law calculations resulting from uncertainties in spectroscopic and molecular constants. This approach has the additional advantage of yielding reaction entropies that can be checked for consistency with various molecular constant assignments for the species involved. In the U-F, U-Cl, and U-Br systems, all of the gaseous species UX, UX{sub 2}, UX{sub 3}, UX{sub 4}, and UX{sub 5}, where X represents the halogen, were identified and characterized; the corresponding species ThX, ThX{sub 2}, ThX{sub 3}, and ThX{sub 4} were studied in the Th-F, Th-Cl, and Th-Br systems. A number of oxyhalide species in the systems U-0-F, U-0-Cl, Th-0-F, and Th-O-Cl were studied thermochemically. Additionally, the sublimation thermodynamics of NpF{sub 4}(s) and NpO{sub 2}F{sub 2}(s) were studied by mass spectrometry.

  18. Nanostructured Organometal Halide Perovskites | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: GridTruckNanostructued Glass-CeramicInnovation

  19. Optimal capacitor placement, replacement and control in large-scale unbalanced distribution systems: System modeling and a new formulation

    SciTech Connect (OSTI)

    Chiang, H.D.; Wang, J.C.; Tong, J. [Cornell Univ., Ithaca, NY (United States). School of Electrical Engineering; Darling, G. [NYSEG Corp., Binghamton, NY (United States). Distribution System Dept.

    1995-02-01T23:59:59.000Z

    This paper undertakes the problem of optimal capacitor placement, replacement and control in large-scale unbalanced, radial or loop distribution networks. The problem is how to optimally determine the locations to install (or replace, or remove) capacitors, the types and sizes of capacitors to be installed (or replaced) and, during each load level, the control schemes for each capacitor in the nodes of a general three-phase unbalanced distribution system such that a desired objective function is minimized while the load constraints, network constraints and operational constraints (e.g. the voltage profile) at different load levels are satisfied. The objective function considered consists of two terms: cost for energy loss and cost related to capacitor purchase, capacitor installation, capacitor replacement and capacitor removal. Comprehensive modelings of different components are presented which include primary power networks, three-phase transformers (different winding connections, off-nominal tap ratio, core and copper losses), co-generators, voltage sensitive load models for single-phase, two-phase and three-phase loads, shunt capacitors and reactors. The new problem is formulated as a combinatorial optimization problem with a non-differentiable objective function. The configuration space essential in the design of an annealing-based solution methodology for the new problem is derived. An effective solution methodology for solving the new problem and numerical studies on a realistic, unbalanced distribution network, a 291-bus with 305 distribution lines and 6 transformers, with varying loading conditions, will be presented in a companion paper.

  20. Optimal capacitor placement, replacement and control in large-scale unbalanced distribution systems: System modeling and a new formulation

    SciTech Connect (OSTI)

    Chiang, H.D.; Wang, J.C.; Tong, J. [Cornell Univ., Ithaca, NY (United States). School of Electrical Engineering; Darling, G. [NYSEG Corp., Binghamton, NY (United States). Distribution System Dept.

    1994-12-31T23:59:59.000Z

    This paper undertakes the problem of optimal capacitor placement, replacement and control in large-scale unbalanced, radial or loop distribution networks. The problem is how to optimally determine the locations to install (or replace, or remove) capacitors, the types and sizes of capacitors to be installed (or replaced) and, during each load level, the control schemes for each capacitor in the nodes of a general three-phase unbalanced distribution system such that a desired objective function is minimized while the load constraints, network constraints and operational constraints (e.g. the voltage profile) at different load levels are satisfied. The objective function considered consists of two terms: cost for energy loss and cost related to capacitor purchase, capacitor installation, capacitor replacement and capacitor removal. Comprehensive modelings of different components are presented which include primary power networks, three-phase transformers (different winding connections, off-nominal tap ratio, core and copper losses), co-generators, voltage sensitive load models for single-phase, two-phase and three-phase loads, shunt capacitors and rectors. The new problem is formulated as a combinational optimization problem with a non-differentiable objective function. The configuration space essential in the design of a annealing-based solution methodology for solving the new problem and numerical studies on a realistic, unbalanced distribution network, a 291-bus with 305 distribution lines and 6 transformers, with varying loading conditions, will be presented in a companion paper.

  1. Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya

    E-Print Network [OSTI]

    Aoki, Paul M.

    Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya in urban centers in the United States and Kenya. The contributions of this work for the CHI/CSCW community countries, including key "emerging markets" such as Brazil, Nigeria and Kenya, the recent growth

  2. Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998,

    E-Print Network [OSTI]

    Data Protection The Data Protection Act 1984 has now been replaced by the Data Protection Act 1998, which is based on the European Data Protection Directive. The 1998 Act applies to both manual for privacy and access by individuals. Information on how to make a request for access to personal data under

  3. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  4. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 48" pipeline to replace 2.31 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  5. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  6. Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D

    E-Print Network [OSTI]

    Bridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # 0029-99 C/D SECTION 07220 ­ ROOF INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions: contains requirements for wood blocking to be installed prior to roof insulation. 1. Roof insulation

  7. The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves

    E-Print Network [OSTI]

    Dehaan, Katherine G.

    2010-07-14T23:59:59.000Z

    received a commercial milk replacer powder (22% Crude Protein / 20% Crude Fat) fed at 1.1% BW. Within metaphylaxis treatment, calves were randomly assigned to receive either: 1) 4 g/d for 7 d and then 2 g/d for 14 d of an egg-based probiotic (PR); 2) 2 g...

  8. Investigation of Cooling and Dehumidification Energy Use and Indoor Thermal Conditions in Polk County Schools Permanent Replacement Classroom Buildings

    E-Print Network [OSTI]

    Moyer, N. A.; Cummings, J. B.; Chasar, D.

    2002-01-01T23:59:59.000Z

    . To this end, the Florida's Polk County School Board has developed a four-quad permanent replacement classroom building. Each classroom is equipped with a package terminal heat pump (PTHP) with a thermostat control with a four-hour crank timer. The objective...

  9. Simulation Analyses in Support of DOE’s Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

    SciTech Connect (OSTI)

    Halverson, Mark A.; Wang, Weimin

    2013-10-16T23:59:59.000Z

    At the request of DOE’s Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

  10. Proposal for the award of a blanket purchase contract for the replacement and maintenance of lifts giving access to the LHC underground areas

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    Proposal for the award of a blanket purchase contract for the replacement and maintenance of lifts giving access to the LHC underground areas

  11. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25T23:59:59.000Z

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  12. Stress Testing of the Philips 60W Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Poplawski, Michael E.; Ledbetter, Marc R.; Smith, Mark

    2012-04-24T23:59:59.000Z

    The Pacific Northwest National Laboratory, operated by Battelle for the U.S. Department of Energy, worked with Intertek to develop a procedure for stress testing medium screw-base light sources. This procedure, composed of alternating stress cycles and performance evaluation, was used to qualitatively compare and contrast the durability and reliability of the Philips 60W replacement lamp L Prize entry with market-proven compact fluorescent lamps (CFLs) with comparable light output and functionality. The stress cycles applied simultaneous combinations of electrical, thermal, vibration, and humidity stresses of increasing magnitude. Performance evaluations measured relative illuminance, x chromaticity and y chromaticity shifts after each stress cycle. The Philips L Prize entry lamps appear to be appreciably more durable than the incumbent energy-efficient technology, as represented by the evaluated CFLs, and with respect to the applied stresses. Through the course of testing, all 15 CFL samples permanently ceased to function as a result of the applied stresses, while only 1 Philips L Prize entry lamp exhibited a failure, the nature of which was minor, non-destructive, and a consequence of a known (and resolved) subcontractor issue. Given that current CFL technology appears to be moderately mature and no Philips L Prize entry failures could be produced within the stress envelope causing 100 percent failure of the benchmark CFLs, it seems that, in this particular implementation, light-emitting diode (LED) technology would be much more durable in the field than current CFL technology. However, the Philips L Prize entry lamps used for testing were carefully designed and built for the competition, while the benchmark CFLs were mass produced for retail sale—a distinction that should be taken into consideration. Further reliability testing on final production samples would be necessary to judge the extent to which the results of this analysis apply to production versions of the Philips L Prize entry.

  13. Low Cost, Single Layer Replacement for the Back-Sheet and Encapsulant Layers

    SciTech Connect (OSTI)

    Kempe, M. D.; Thapa, P.

    2008-01-01T23:59:59.000Z

    Ethylene propylene diene monomer (EPDM) based polymers have been formulated for specific use in photovoltaic modules to produce better performance and longer term stability at a lower cost than standard materials. EPDM formulations are advantageous over ethylene vinyl-acetate (EVA) because they can use the same lamination/cure cycle as EVA, they do not need a second back-sheet protective material (e.g. PET/Tedlar), they have a lower glass transition temperature, no melting transition, more constant mechanical moduli as a function of temperature, they are less polar than EVA (provides better corrosion protection), and they have excellent damp heat (85 C/85% relative humidity) resistance against delamination. Module designs typically use EVA on the back side of cells despite the fact that transparency is not advantageous. We have developed a single encapsulant layer that will replace standard module back-sheet constructions consisting of EVA/PET/Tedlar. Because a single low-cost material layer is used, it will provide a significant materials cost savings of about $6 to $8/m{sup 2} as compared to traditional back-sheets. Electrical insulation tests were conducted using 0.85 mm thick stainless steel sheets as a model for a cell. It was found that a polymer layer thickness of about 0.33mm provided better high voltage electrical insulation than a combined film of Tedla (0.038 mm)/PET (0.051 mm)/EVA (0.55 mm). When formulated with a white pigment, reflectivity was comparable to Tedlar{trademark}. Upon accelerated exposure to light at 60C and 60% RH it was found that an EVA layer in front of these materials would decompose before significant yellowing and delamination of the back EPDM layer occurs.

  14. Max Tech and Beyond: High-Intensity Discharge Lamps

    SciTech Connect (OSTI)

    Scholand, Michael

    2012-04-01T23:59:59.000Z

    High-intensity discharge (HID) lamps are most often found in industrial and commercial applications, and are the light source of choice in street and area lighting, and sports stadium illumination. HID lamps are produced in three types - mercury vapor (MV), high pressure sodium (HPS) and metal halide (MH). Of these, MV and MH are considered white-light sources (although the MV exhibits poor color rendering) and HPS produces a yellow-orange color light. A fourth lamp, low-pressure sodium (LPS), is not a HID lamp by definition, but it is used in similar applications and thus is often grouped with HID lamps. With the notable exception of MV which is comparatively inefficient and in decline in the US from both a sales and installed stock point of view; HPS, LPS and MH all have efficacies over 100 lumens per watt. The figure below presents the efficacy trends over time for commercially available HID lamps and LPS, starting with MV and LPS in 1930's followed by the development of HPS and MH in the 1960's. In HID lamps, light is generated by creating an electric arc between two electrodes in an arc tube. The particles in the arc are partially ionized, making them electrically conductive, and a light-emitting 'plasma' is created. This arc occurs within the arc tube, which for most HID lamps is enclosed within an evacuated outer bulb that thermally isolates and protects the hot arc tube from the surroundings. Unlike a fluorescent lamp that produces visible light through down-converting UV light with phosphors, the arc itself is the light source in an HID lamp, emitting visible radiation that is characteristic of the elements present in the plasma. Thus, the mixture of elements included in the arc tube is one critical factor determining the quality of the light emitted from the lamp, including its correlated color temperature (CCT) and color rendering index (CRI). Similar to fluorescent lamps, HID lamps require a ballast to start and maintain stable operating conditions, and this necessitates additional power beyond that used by the lamp itself. HID lamps offer important advantages compared to other lighting technologies, making them well suited for certain applications. HID lamps can be very efficient, have long operating lives, are relatively temperature-insensitive and produce a large quantity of light from a small package. For these reasons, HID lamps are often used when high levels of illumination are required over large areas and where operating and maintenance costs must be kept to a minimum. Furthermore, if the installation has a significant mounting height, high-power HID lamps can offer superior optical performance luminaires, reducing the number of lamps required to illuminate a given area. The indoor environments best suited to HID lamps are those with high ceilings, such as those commonly found in industrial spaces, warehouses, large retail spaces, sports halls and large public areas. Research into efficacy improvements for HID lighting technologies has generally followed market demand for these lamps, which is in decline for MV and LPS, has reached a plateau for HPS and is growing for MH. Several manufacturers interviewed for this study indicated that although solid-state lighting was now receiving the bulk of their company's R&D investment, there are still strong HID lamp research programs, which concentrate on MH technologies, with some limited amount of investment in HPS for specific niche applications (e.g., agricultural greenhouses). LPS and MV lamps are no longer being researched or improved in terms of efficacy or other performance attributes, although some consider MH HID lamps to be the next-generation MV lamp. Thus, the efficacy values of commercially available MV, LPS and HPS lamps are not expected to increase in the next 5 to 10 years. MH lamps, and more specifically, ceramic MH lamps are continuing to improve in efficacy as well as light quality, manufacturability and lamp life. Within an HID lamp, the light-producing plasma must be heated to sufficiently high temperatures to achieve high efficiencie

  15. Effects of Heat Stress and Increased Protein Fed in Milk Replacers on the Health and Growth Parameters of Neonatal Holstein Bull Calves 

    E-Print Network [OSTI]

    Krenek, Andrew

    2012-10-19T23:59:59.000Z

    Objectives of the study were to evaluate if calves fed 6 L of high protein milk replacer (HPMR; 1135 g/d, 28% crude protein (CP), 20% fat) had improved performance and health as compared to calves fed 4 L of a conventional milk replacer (CMR; 454 g...

  16. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A [ORNL

    2009-10-01T23:59:59.000Z

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

  17. Adjusting Milk Replacer Intake During Heat Stress and Non-heat Stress as a Means of Improving Dairy Calf Performance

    E-Print Network [OSTI]

    Chavez, Theresa Marie

    2012-07-16T23:59:59.000Z

    ADJUSTING MILK REPLACER INTAKE DURING HEAT STRESS AND NON-HEAT STRESS AS A MEANS OF IMPROVING DAIRY CALF PERFORMANCE A Thesis by THERESA MARIE CHAVEZ Submitted to the Office of Graduate Studies of Texas A&M University... A Thesis by THERESA MARIE CHAVEZ Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved by: Co-Chairs of Committee, Glenn Holub...

  18. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  19. The IAEA Workshop on Requirements and Potential Technologies for Replacement of 3He Detectors in IAEA Safeguards Applications

    SciTech Connect (OSTI)

    Pickrell, Mark; Lavietes, Anthony; Gavron, Victor A.; Henzlova, D.; Joyce, Malcolm J.; Kouzes, Richard T.; Menlove, H. O.

    2013-01-01T23:59:59.000Z

    From 22 – 24 March, 2011, the International Atomic Energy Agency (IAEA) held an international workshop to address the question of a possible replacement for helium-3 based neutron detectors. Within this wider scope, the workshop was focused on those applications used in IAEA verification activities. There were two principle objectives of the workshop: 1) to determine the specific requirements that a potential replacement technology would have to satisfy, and 2) to identify alternative detector technologies that appear promising for meeting those requirements. The workshop was successful in achieving both objectives. A set of detailed and quantitative specifications was developed and achieved a general consensus among the conference participants. These included operational considerations such as temperature stability, safety, weight, and cost in addition to a number of performance requirements. The performance requirements were derived from an analysis of the spectrum of IAEA applications that use neutron detectors. After analyzing these applications, it was determined that the most common application for 3He detectors was for neutron coincidence counting, comprising over 95% of 3He use. The details and rationale for this assessment will be provided. The performance requirements for neutron coincidence counting can be directly calculated from the standard variance expressions. From these, a basic figure of merit (FOM) was developed that can be used to rank various different options. For neutron coincidence counting, the figure of merit is: , where ? is the detection efficiency and is the detector die away time. Both the FOM and the calculations will be presented. The full list of requirements is included in this paper. The second purpose of the workshop was to identify promising replacement technologies. There were multiple presentations of candidate detection technologies over the course of the workshop, covering a wide spectrum of approaches and detection physics. These technologies were judged relative to the performance of a 3He-based system, as well as its ability to meet the replacement technology requirements as developed in this workshop. The paper will present a summary of this assessment.

  20. Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology

    SciTech Connect (OSTI)

    Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

    2012-07-16T23:59:59.000Z

    This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

  1. Waste minimization plan construction and operation of the replacement cross-site transfer system, project W-058

    SciTech Connect (OSTI)

    Boucher, T.D.

    1996-04-01T23:59:59.000Z

    This report addresses the research and development of a waste minimization plan for the construction and operation of Project W-058, Replacement of the Cross-Site Transfer System, on the Hanford Site. The plan is based on Washington Administrative Code (WAC) 173-307, Plans. The waste minimization plan identifies areas where pollution prevention/waste minimization principles can be incorporated into the construction and operation of the cross-site transfer system.

  2. Optimal capacitor placement, replacement and control in large-scale unbalanced distribution systems: System solution algorithm and numerical studies

    SciTech Connect (OSTI)

    Chiang, H.D.; Wang, J.C.; Tong, J. [Cornell Univ., Ithaca, NY (United States). School of Electrical Engineering; Darling, G. [NYSEG Corp., Binghamton, NY (United States). Distribution System Dept.

    1994-12-31T23:59:59.000Z

    This paper develops an effective and, yet, practical solution methodology for optimal capacitor placement, replacement and control in large-scale unbalanced, general radial or loop distribution systems. The solution methodology can optimally determine (1) the locations to install (or replace, or remove) capacitors, (2) the types and sizes of capacitors to be installed (or replaced) and, during each load level, (3) the control schemes for each capacitor in the nodes of a general three-phase unbalanced distribution system such that a desired objective function is minimized while the load constraints, network constraints and operational constraints at different load levels are satisfied. The solution methodology is based on a combination of the simulated annealing technique and the greedy search technique in order to achieve computational speed and high-quality of solutions. Both the numerical and implementational aspects of the solution methodology are detailed. Analysis of the computational complexity of the solution algorithm indicated that the algorithm is also effective for large-scale distribution systems in terms of occupational efforts. Test results on a realistic, unbalanced distribution network, a 291-bus with 77 laterals, 305 distribution lines and 6 transformers, with varying loading conditions, are presented with promising results. The robustness of the solution methodology under varying loading conditions is also investigated.

  3. Optimal capacitor placement, replacement and control in large-scale unbalanced distribution systems: System solution algorithms and numerical studies

    SciTech Connect (OSTI)

    Chiang, H.D.; Wang, J.C.; Tong, J. [Cornell Univ., Ithaca, NY (United States). School of Electrical Engineering; Darling, G. [NYSEG Corp., Binghamton, NY (United States). Distribution System Dept.

    1995-02-01T23:59:59.000Z

    This paper develops an effective and, yet, practical solution methodology for optimal capacitor placement, replacement and control in large-scale unbalanced, general radial or loop distribution systems. The solution methodology can optimally determine (i) the locations to install (or replace, or remove) capacitors, (ii) the types and sizes of capacitors to be installed (or replaced) and, during each load level, (iii) the control schemes for each capacitor in the nodes of a general three-phase unbalanced distribution system such that a desired objective function is minimized while the load constraints, network constraints and operational constraints at different load levels are satisfied. The solution methodology is based on a combination of the simulated annealing technique and the greedy search technique in order to achieve computational speed and high-quality of solutions. Both the numerical and implementational aspects of the solution methodology are detailed. Analysis of the computational complexity of the solution algorithm indicates that the algorithm is also effective for large-scale distribution systems in terms of computational efforts. Test results on a realistic, unbalanced distribution network, a 291-bus with 77 laterals, 305 distribution lines and 6 transformers, with varying loading conditions, are presented with promising results. The robustness of the solution methodology under varying loading conditions is also investigated.

  4. Advanced Pipe Replacement Procedure for a Defective CRDM Housing Nozzle Enables Continued Normal Operation of a Nuclear Power Plant

    SciTech Connect (OSTI)

    Gilmore, Geoff; Becker, Andrew [Climax Portable Machine Tools, Inc., 2712 East Second Street, Newberg, OR 97132 (United States)

    2006-07-01T23:59:59.000Z

    During the 2003 outage at the Ringhals Nuclear Plant in Sweden, a leak was found in the vicinity of a Control Rod Drive Mechanism (CRDM) housing nozzle at Unit 1. Based on the ALARA principle for radioactive contamination, a unique repair process was developed. The repair system includes utilization of custom, remotely controlled GTAW-robots, a CNC cutting and finishing machine, snake-arm robots and NDE equipment. The success of the repair solution was based on performing the machining and welding operations from the inside of the SCRAM pipe through the CRDM housing since accessibility from the outside was extremely limited. Before the actual pipe replacement procedure was performed, comprehensive training programs were conducted. Training was followed by certification of equipment, staff and procedures during qualification tests in a full scale mock-up of the housing nozzle. Due to the ingenuity of the overall repair solution and training programs, the actual pipe replacement procedure was completed in less than half the anticipated time. As a result of the successful pipe replacement, the nuclear power plant was returned to normal operation. (authors)

  5. Synthesis and X-ray Structural Study on the Complexes of Silver(I) Halide with Tricyclohexylephosphine, Diphenyl-(2,4,6-trimethoxy)phenylphosphine, Phenyl-2,4,6-trimethoxyphenyl phosphine, and Tris(2,4,6-trimethoxy)phenylphosphine

    SciTech Connect (OSTI)

    Effendy [Jurusan Kimia, FMIPA Universitas Negeri Malang, Jl. Surabaya 6 Malang 65145 (Indonesia); White, A. H. [Chemistry, School of Biomedical, Biomolecular, and Chemical Sciences, The University of Western Australia, 35 Stirling Highway, Crawley WA 6009 (Australia)

    2008-03-17T23:59:59.000Z

    A diverse array of structures for the complexes of silver(I) halide with triphenylphosphine (PPh{sub 3}) has been studied. The complexes may be described as being of the type [AgX(PPh{sub 3}){sub n}] (X = Cl, Br or I). The value of n varies in the range of 1-3. This also indicates that the stoichiometry of the complexes is in the range of 1-3. The complex with stoichiometry 1:1 is a tetramer. There are two structural types of tetramer reported, termed cubane and step or chair. The cubane structure has been reported for [AgX(PPh{sub 3})]{sub 4} (X = Cl, Br or I), while the step structure has only been reported for [AgI(PPh{sub 3})]{sub 4}. The complex with stoichiometry 1:2 may be a monomer or a dimer. The monomer has a quasi trigonal planar structural type and has only been reported for [AgBr(PPh{sub 3}){sub 2}]. The dimer has been reported for [(PPh{sub 3}){sub 2}Ag({mu}-X){sub 2}Ag(PPh{sub 3}){sub 2}] (X = Cl or Br) with silver atom in the distorted tetrahedral environment. The complex with stoichiometry 1:3 has a distorted tetrahedral structural type and has been reported for [AgX(PPh{sub 3}){sub 3}] (X = Cl, Br or I). Changing PPh{sub 3} with more hindered ligand such as tricyclohexylephosphine (Pcy{sub 3}) or derivative of PPh{sub 3} such as diphenyl-2,4,6-trimethoxy(phenyl)phosphine (dpmp), phenyl-bis{l_brace}2,4,6-trimethoxy(phenyl){r_brace} phosphine (pdmp), or tris{l_brace}2,4,6-trimethoxy(phenyl){r_brace}phosphine (tmpp) may give complexes with various structural types but with lower range of stoichiometry. Synthesis and X-ray structural study of these complexes has been done with the results summarized below. Silver(I) halide and Pcy{sub 3} give complexes with stoichiometry 1:1 and 1:2. The complex with stoichiometry 1:1 is a dimer or cubane. The dimer is observed for [(Pcy{sub 3})Ag({mu}-X){sub 2}Ag(Pcy{sub 3})] (X = Cl or Br). The unusual dimer is observed for [(Pcy{sub 3})Ag({mu}-I){sub 2}({mu}-py)Ag(Pcy{sub 3})] where the pyridine ligand is bonded to two silver atoms. The cubane is observed for [AgI(Pcy{sub 3})]{sub 4}. The complex with stoichiometry 1:2 has a quasi trigonal planar structural type and has been observed for [AgX(Pcy{sub 3}){sub 2}] (X = Cl, Br, I). Silver(I) halide and dpmp give complexes with stoichiometry 1:1 and 1:2. The complex with stoichiometry 1:1 is a dimer and has been observed for [(dpmp)Ag({mu}-X){sub 2}Ag(dpmp)] (X = Cl, Br or I). The complex with stoichiometry 1:2 has a quasi trigonal planar structural type and has been observed for [AgX(dpmp){sub 2}] (X = Cl, Br, I). Silver(I) halide and pdmp also give complexes with stoichiometry 1:1 and 1:2. The complex with stoichiometry 1:1 is a dimer and has been observed for [(pdmp)Ag({mu}-X){sub 2}Ag(pdmp)] (X Cl, Br or I). The complex with stoichiometry 1:2 has a quasi trigonal planar structural type and has been observed for [AgX(pdmp){sub 2}] (X = Cl, Br, I). Silver(I) halide and tmmp only give complexes with stoichiometry 1:1. This complex is a monomer and has been observed for [AgX(tmpp)] (X = Cl or Br). In this complex the silver atom is in a quasi linear environment. Based on the bond lengths between silver and phosphorous atoms in the complexes obtained, it can be concluded that bulky ligands tend to give complexes with lower range of stoichiometry. In addition, the bulkier the ligand the longer the bond length between the silver and phosphorous atoms.

  6. Relation of the Water-Soluble Potash, the Replaceable and Acid-Soluble Potash to the Potash Removed by Crops in Pot Experiments. 

    E-Print Network [OSTI]

    Fraps, G. S. (George Stronach)

    1929-01-01T23:59:59.000Z

    EXPERI!EENT STAT-CN LIBRARY, BUILDING. KAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION, BRAZOS COUNTY. TEXAS ETIN NO. 391 JANUARY, 1929 DIVISION OF CHEMISTRY Relation 06 the Water-Soluble Potash, the Replaceable..., the replaceable potash, and the active potash of the soil. The amount of potash taken up by crops of corn and kafir or mi10 usually averages about one-half the replaceable potash and five to six times the water-soluble potash in the soil. The losses of potash...

  7. EA-1793: Replacement Capability for Disposal of Remote-handled Low-level Waste Generated at the Department of Energy's Idaho Site

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017.

  8. Does preservation of the sub-valvular apparatus during mitral valve replacement affect long-term survival and quality of life? A Microsimulation Study

    E-Print Network [OSTI]

    Rao, Christopher; Hart, Jonathan; Chow, Andre; Siannis, Fotios; Tsalafouta, Polyxeni; Murtuza, Bari; Darzi, Ara; Wells, Frank C; Athanasiou, Thanos

    2008-04-23T23:59:59.000Z

    Abstract Background Techniques to preserve the sub-valvular apparatus in order to reduce morbidity and mortality following mitral valve replacement have been frequently reported. However, it is uncertain what impact sub-valvular apparatus...

  9. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final 

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  10. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  11. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  12. Development of a pilot safety information document (PSID) for the replacement of radioactive liquid waste treatment facility at Los Alamos National Laboratory

    E-Print Network [OSTI]

    Selvage, Ronald Derek

    1995-01-01T23:59:59.000Z

    Based on recent decisions made by Los Alamos National Laboratory concerning the development of site-wide National Environmental Policy Act documents, an effort was undertaken to develop a Pilot Safety Information Document (PSID) for the replacement...

  13. Text-Alternative Version: The L Prize-Winning LED A19 Replacement—What Commercial Building Owners/Operators Can Expect in 2012

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "The L Prize-Winning LED A19 Replacement—What Commercial Building Owners/Operators Can Expect in 2012" webcast, held January 18, 2012.

  14. Halide and Oxy-Halide Eutectic Systems for High-Performance,...

    Broader source: Energy.gov (indexed) [DOE]

    and analysis for the salt candidates of singles, and eutectics. * High temperature corrosion test has been undergoing using Tafel Polarization studies. * High temperature fluid...

  15. Halide and Oxy-halide Eutectic Systems for High Performance High...

    Broader source: Energy.gov (indexed) [DOE]

    Compatibility Carbon Steel (<425 o C), Stainless Steel (<650 o C) and Nickel Alloys. Corrosion <100myear Materials Cost 1 kg 5 The eutectic salt will be engineered to...

  16. Halide and Oxy-Halide Eutectic Systems for High Performance High...

    Broader source: Energy.gov (indexed) [DOE]

    candidates. * Experimental test systems are under development for high temperature corrosion analysis and test. * High temperature fluid properties (salts mixtures with or...

  17. Halide and Oxy-halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids

    Broader source: Energy.gov [DOE]

    This presentation was delivered at the SunShot Concentrating Solar Power (CSP) Program Review 2013, held April 23–25, 2013 near Phoenix, Arizona.

  18. Project Profile: Halide and Oxy-Halide Eutectic Systems forHigh...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A freezing point below 250C Stability at temperatures greater than 800C Low corrosion of stainless steel and high-nickel content alloys A cost of less than 1kg....

  19. Halide and Oxy-Halide Eutectic Systems for High-Performance,

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013 DOE8,

  20. Evaluation of lysine deficient grower diets for heavy breed replacement pullets and a comparison of sorghum grains and corn as a carbohydrate source for broiler-breeder hens

    E-Print Network [OSTI]

    Tolan, Alan

    1967-01-01T23:59:59.000Z

    EVALUATION OF LYSINE DEFICIENT GROWER DIETS FOR HEAVY BREED REPLACEMENT PULLETS AND A COMPARISON OF SORGHUM GRAINS AND CORN AS A CARBOHYDRATE SOURCE FOR BROILER-BREEDER HENS A Thesis ALAN TOLAN Submitted to the Graduate College of the Texas... ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE January 1967 Major Subject: Animal Nutrition EVALUATION OF LYSINE DEFICIENT GROWER DIETS FOR HEAVY BREED REPLACEMENT PULLETS AND A COMPARISON OF SORGHUM...

  1. Can the wave function in configuration space be replaced by single-particle wave functions in physical space?

    E-Print Network [OSTI]

    Travis Norsen; Damiano Marian; Xavier Oriols

    2014-10-14T23:59:59.000Z

    The ontology of Bohmian mechanics includes both the universal wave function (living in 3N-dimensional configuration space) and particles (living in ordinary 3-dimensional physical space). Proposals for understanding the physical significance of the wave function in this theory have included the idea of regarding it as a physically-real field in its 3N-dimensional space, as well as the idea of regarding it as a law of nature. Here we introduce and explore a third possibility in which the configuration space wave function is simply eliminated -- replaced by a set of single-particle pilot-wave fields living in ordinary physical space. Such a re-formulation of the Bohmian pilot-wave theory can exactly reproduce the statistical predictions of ordinary quantum theory. But this comes at the rather high ontological price of introducing an infinite network of interacting potential fields (living in 3-dimensional space) which influence the particles' motion through the pilot-wave fields. We thus introduce an alternative approach which aims at achieving empirical adequacy (like that enjoyed by GRW type theories) with a more modest ontological complexity, and provide some preliminary evidence for optimism regarding the (once popular but prematurely-abandoned) program of trying to replace the (philosophically puzzling) configuration space wave function with a (totally unproblematic) set of fields in ordinary physical space.

  2. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect (OSTI)

    Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-08-01T23:59:59.000Z

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  3. Conceptual Design for Replacement of the DTL and CCL with Superconducting RF Cavities in the Spallation Neutron Source Linac

    SciTech Connect (OSTI)

    Champion, Mark S [ORNL] [ORNL; Doleans, Marc [ORNL] [ORNL; Kim, Sang-Ho [ORNL] [ORNL

    2013-01-01T23:59:59.000Z

    The Spallation Neutron Source Linac utilizes normal conducting RF cavities in the low energy section from 2.5 MeV to 186 MeV. Six Drift Tube Linac (DTL) structures accelerate the beam to 87 MeV, and four Coupled Cavity Linac (CCL) structures provide further acceleration to 186 MeV. The remainder of the Linac is comprised of 81 superconducting cavities packaged in 23 cryomodules to provide final beam energy of approximately 1 GeV. The superconducting Linac has proven to be substantially more reliable than the normal conducting Linac despite the greater number of stations and the complexity associated with the cryogenic plant and distribution. A conceptual design has been initiated on a replacement of the DTL and CCL with superconducting RF cavities. The motivation, constraints, and conceptual design are presented.

  4. An optimal state-age replacement policy for a semi-Markov deterioration process / by Tilden Newton Mike

    E-Print Network [OSTI]

    Mikel, Tilden Newton

    1977-01-01T23:59:59.000Z

    z P(i. J) = I for all 1 ~ E. j = 0 The policy vector x is the set of decisions at each state (Kp, Kz . . . K ) where x. indicates the decis1on to replace the system 1 given that 1t has been in state 1 for x. units of time. Each x. 1 1 has a... interval [O, t]. The cumulative probability distribution for the sojourn time in state i is denoted by H(i, ') for i ~ E and is given by H(i, t) = z 0(i, j, t) for i, j e E, t ~ 0. j e A constraint imposed on the system is that the cumulative proba...

  5. A general three-state model with biased population replacement: analytical solution and application to language dynamics

    E-Print Network [OSTI]

    Colaiori, Francesca; Cuskley, Christine F; Loreto, Vittorio; Pugliese, Martina; Tria, Francesca

    2014-01-01T23:59:59.000Z

    Empirical evidence shows that the rate of irregular usage of English verbs exhibits discontinuity as a function of their frequency: the most frequent verbs tend to be totally irregular. We aim to qualitatively understand the origin of this feature by studying simple agent--based models of language dynamics, where each agent adopts an inflectional state for a verb and may change it upon interaction with other agents. At the same time, agents are replaced at some rate by new agents adopting the regular form. In models with only two inflectional states (regular and irregular), we observe that either all verbs regularize irrespective of their frequency, or a continuous transition occurs between a low frequency state where the lemma becomes fully regular, and a high frequency one where both forms coexist. Introducing a third (mixed) state, wherein agents may use either form, we find that a third, qualitatively different behavior may emerge, namely, a discontinuous transition in frequency. We introduce and solve an...

  6. An assessment of alternatives for replacing Freon 113 in bench type electrical circuit board cleaning at Fermi National Accelerator Laboratory

    SciTech Connect (OSTI)

    Isakson, K.; Vessell, A.L.

    1994-07-01T23:59:59.000Z

    Fermilab is presently phasing out all solvents containing Freon-113 (CFC-113) as part of the continuing Waste Minimization Program. These solvents are used primarily in cleaning the flux off of electronic circuit boards after soldering, specifically in bench type work. Title VI of the Clean Air Act mandates a production phase-out for ozone depleting substances, like CFC-113, by the year 2000. Our study addresses this issue by evaluating and choosing alternative non-CFC solvents to replace the CFC-1 13 solvents at Fermilab. Several potential non-CFC cleaning solvents were tested. The evaluation took place in three parts: controlled experimental evaluation, chemical composition evaluation, and employee performed evaluation. First, we performed a controlled nine-step procedure with the potential solvents where each was evaluated in categories such as cleaning effectiveness, odor, residue, type of output and drying time. Next, we listed the chemical composition of each solvent. We noted which solvents contained hydrochlorofluorocarbons because they are targeted for phase-out in the future and will be recognized as interim solutions only. Finally, after preliminary testing, five solvents were chosen as the best options. These solvents were sent to be tested by Fermilab employees who use such materials. Their opinions are valuable not only because they are knowledgeable in this field, but also because they will be using the solvents chosen to replace the CFC-113 solvents. The results favored two ``best alternatives``: Safezone Solvent Flux Remover by Miller-Stephenson and E-Series CFC Free Flux-Off 2000 by Chemtech. Another possible solution also pursued is the no-clean solder option. In our study, we were not able to thoroughly investigate the many types of no-clean solders because of time and financial constraints. The testing that was done, however, showed that no-clean solder was a viable alternative in many cases.

  7. Centrifuges Replacement Study Proposal

    E-Print Network [OSTI]

    Iqbal, Muhammad

    2005-12-16T23:59:59.000Z

    characteristics, features of equipment, auxiliaries furnished, overall dims., mat?ls. of constr., est. wt. and complete motor data. 3 3 8 2 NOISE LEVEL DATA for all equipment generating a sound level of 80 DBA or higher, at 3 feet distance... power unit. Meets all requirements 1.3.17 Vibration monitor. Meets all requirements 1.3.18 Transport lock. Meets all requirements 1.3.19 Variable frequency drive system with drive motor and v-belt drive with guard. Meets all requirements 1...

  8. Replacing Valuable Papers.

    E-Print Network [OSTI]

    Anoymous,

    1982-01-01T23:59:59.000Z

    Resources; Austin, Texas 78701; (512)441-3355; cost $3. For out-of-state or country, obtain a copy of: Where to Write for Birth and Death Records - U.S. and Outlying Areas. HE 20.6202 B53/978 or Where to Write for Birth and Death Certificates of U.... For Mastercharge, Visa, American Express or oil company credit cards, contact a bank or service station which handles new applications for the cor rect address. Birth certificates For births in Texas: Bureau of Vital Statistics; Texas Department of Health...

  9. Rapid bridge deck replacement

    E-Print Network [OSTI]

    Osegueda, Roberto Alejandro

    1983-01-01T23:59:59.000Z

    Prototype End Section Inertia Calculations . . . . . . 169 172 183 185 200 202 208 209 C-3 Design 1/3 Model Middle Section Inertia Calculations . . . 211 C-4 Design 1/3 Model End Section Inertia Calculations . . . . D-1 Actual Model Middle Section...

  10. UTILITIES -STOKER BOILER REPLACEMENT

    E-Print Network [OSTI]

    Mayfield, John

    HUGHESAVE COUNTRY CL UBBLVD GRAEBER ST BIG BLU ESTEMCOURT LI TTLE BLUESTEM COURT CO LLEGE MAPLE, WILLOW

  11. Filter Replacement Activities Complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb.Information 9 Default CaptionJoint Facilities4,

  12. Spacer Damper Replacement Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebookScholarship Fund3Biology|Solar windMarchSpace-AgeSpacer Damper

  13. Report on the oversight assessment of the operational readiness review of the Replacement Tritium Facility at Savannah River Site

    SciTech Connect (OSTI)

    Lee, B.T.

    1993-03-01T23:59:59.000Z

    This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy's (DOE) Office of Environment, Safety and Health (EH) of operational readiness review (ORR) activities for the Replacement Tritium Facility (RTF) located at Savannah River Site (SRS). The EH OA of this facility took place concurrently with an ORR conducted by the DOE Office of Defense Programs (DP). The DP ORR was conducted from January 19 through February 5, 1993. The EH OA was performed in accordance with the protocol and procedures specified in EH Program for Oversight Assessment of Operational Readiness Evaluations for Startups and Restarts,'' dated September 15, 1992. The EH OA Team evaluated the DP ORR to determine whether it was thorough and demonstrated sufficient inquisitiveness to verify that the implementation of programs and procedures adequately ensures the protection of worker safety and health. The EH OA Team performed its evaluation of the DP ORR in the following technical areas: occupational safety, industrial hygiene, and respiratory protection; fire protection; and chemical safety. In the areas of fire protection and chemical safety, the EH OA Team conducted independent vertical-slice reviews to confirm DP ORR results. Within each technical area, the EH OA Team reviewed the DP ORR Plan, including the Criteria Review and Approach Documents (CRADs); the qualifications of individual DP ORR team members; the performance of planned DP ORR activities; and the results of the DP ORR.

  14. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31T23:59:59.000Z

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

  15. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  16. Charge-transfer-induced suppression of galvanic replacement and synthesis of (Au-Ag)-Au double shell nanoparticles for highly uniform, robust and sensitive bioprobes

    SciTech Connect (OSTI)

    Dao Thi Ngoc Anh; Singh, Prerna; Shankar, Cheshta; Mott, Derrick; Maenosono, Shinya [Japan Advanced Institute of Science and Technology, 1-1 Asahidai, Nomi, Ishikawa 923-1292 (Japan)

    2011-08-15T23:59:59.000Z

    The synthesis of double shell (Au-Ag)-Au nanoparticles is accomplished through suppression of the galvanic replacement reaction caused by an electron transfer phenomenon. The resulting nanoparticles are monodisperse with a thin and uniform second Au shell. These particles are ultimately expected to lead to sensitive probes for biomolecular sensing and diagnostics.

  17. Cash for Clunkers Refrigerator Reimbursement Program To receive a financial incentive for replacing an OSU-owned old, inefficient, in-use and food-only

    E-Print Network [OSTI]

    Escher, Christine

    Cash for Clunkers Refrigerator Reimbursement Program To receive a financial incentive for replacing an OSU-owned old, inefficient, in-use and food-only refrigerator, please follow the steps below 1) Email (building and room #) of existing refrigerator c. Make and model # of existing refrigerator d. Make

  18. Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis' California Lighting Technology Center will utilize Jade Sky Technologies' driver ICs to help spur

    E-Print Network [OSTI]

    California at Davis, University of

    Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis and power factor. "JST shares our goal of making the transition to LED lamps a satisfying experience of cost-effective, easy-to-use LED lighting solutions Milpitas, Calif. ­ October 15, 2013 ­ Jade Sky

  19. Proceedings of Institute of Mathematics of NAS of Ukraine 2004, Vol. 50, Part 3, 13901395 Numerical Simulation of Replacing Oil by Water

    E-Print Network [OSTI]

    Popovych, Roman

    ­1395 Numerical Simulation of Replacing Oil by Water in a Scale-Invariant Porous Medium Ekaterina P. KUROCHKINA with 2563 grid in spatial variables. 1 Introduction The interface of oil displaced by water is unstable a significant influence on the transport of water and oil. The permeability heterogenei- ty is often identified

  20. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The tight coupling between system and market

    E-Print Network [OSTI]

    Gross, George

    to facilitate real-time secure power system operations. We illustrate the application of the approach security. Index Terms-- power system security management, security criterion, day-ahead and real> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT)

  1. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

  2. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  3. Performance of T12 and T8 Fluorescent Lamps and Troffers and LED Linear Replacement Lamps CALiPER Benchmark Report

    SciTech Connect (OSTI)

    Myer, Michael; Paget, Maria L.; Lingard, Robert D.

    2009-01-16T23:59:59.000Z

    The Department of Energy (DOE) Commercially Available LED Product Evaluation and Reporting (CALiPER) Program was established in 2006 to investigate the performance of light-emitting diode (LED) based luminaires and replacement lamps. To help users better compare LED products with conventional lighting technologies, CALiPER has also performed benchmark research and testing of traditional (i.e., non-LED) lamps and fixtures. This benchmark report addresses standard 4-foot fluorescent lamps (i.e., T12 and T8) and the 2-foot by 4-foot recessed troffers in which they are commonly used. This report also examines available LED replacements for T12 and T8 fluorescent lamps, and their application in fluorescent troffers. The construction and operation of linear fluorescent lamps and troffers are discussed, as well as fluorescent lamp and fixture performance, based on manufacturer data and CALiPER benchmark testing. In addition, the report describes LED replacements for linear fluorescent lamps, and compares their bare lamp and in situ performance with fluorescent benchmarks on a range of standard lighting measures, including power usage, light output and distribution, efficacy, correlated color temperature, and the color rendering index. Potential performance and application issues indicated by CALiPER testing results are also examined.

  4. Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision

    SciTech Connect (OSTI)

    Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

    2000-05-01T23:59:59.000Z

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  5. actinide halide complexes: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Complex Compounds Chemistry, Division of materials chemistry, Ruer Boskovi, Croatia * Corresponding author: Address: Laboratory for Solid-State and Complex Compounds...

  6. Water Exchange Rates and Molecular Mechanism around Aqueous Halide Ions

    SciTech Connect (OSTI)

    Annapureddy, Harsha V.; Dang, Liem X.

    2014-07-17T23:59:59.000Z

    Molecular dynamics simulations were performed to systematically study the water-exchange mechanism around aqueous chloride, bromide, and iodide ions. Transition state theory, Grote-Hynes theory, and the reactive flux method were employed to compute water exchange rates. We computed the pressure dependence of rate constants and the corresponding activation volumes to investigate the mechanism of the solvent exchange event. The activation volumes obtained using the transition state theory rate constants are negative for all the three anions, thus indicating an associative mechanism. Contrary to the transition state theory results, activation volumes obtained using rate constants from Grote-Hynes theory and the reactive flux method are positive, thus indicating a dissociative mechanism. The Division of Chemical Sciences, Geosciences, and Biosciences, Office of Basic Energy Sciences (BES), of the U.S. Department of Energy (DOE) funded this work. Battelle operates Pacific Northwest National Laboratory for DOE. The calculations were carried out using computer resources provided by BES.

  7. actinide halides final: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Peer Review Report Engineering Websites Summary: ) for Pine Creek Lake, McCurtain County, Oklahoma Prepared by Battelle Memorial Institute Prepared Contract No....

  8. Reactions of nitrogen heterocycle-organolithium intermediates with lead halides 

    E-Print Network [OSTI]

    Kinney, Jerry Neal

    1970-01-01T23:59:59.000Z

    to be lithium chloride. The organic layer was subjected to gentle heating (electric heating mantle) to remove THF. Concentrating the sample to 25$ of its original volume resulted In formation of black solid, 4. 2 g (41. 7$), identified as metallic lead... dichloride (92-95%) was recovered in the case of 2-pyridyl, 3-pyridyl, and 4-picolyl- lithium. The attempted preparations of unsymmetrical organolead compounds, R&PbR where R is ethyl or phenyl and R ' is 2-phenyl- pyridyl or I-phenylisoquinoiyl, via...

  9. Alkaline and alkaline earth metal phosphate halides and phosphors

    DOE Patents [OSTI]

    Lyons, Robert Joseph; Setlur, Anant Achyut; Cleaver, Robert John

    2012-11-13T23:59:59.000Z

    Compounds, phosphor materials and apparatus related to nacaphite family of materials are presented. Potassium and rubidium based nacaphite family compounds and phosphors designed by doping divalent rare earth elements in the sites of alkaline earth metals in the nacaphite material families are descried. An apparatus comprising the phosphors based on the nacaphite family materials are presented herein. The compounds presented is of formula A.sub.2B.sub.1-yR.sub.yPO.sub.4X where the elements A, B, R, X and suffix y are defined such that A is potassium, rubidium, or a combination of potassium and rubidium and B is calcium, strontium, barium, or a combination of any of calcium, strontium and barium. X is fluorine, chlorine, or a combination of fluorine and chlorine, R is europium, samarium, ytterbium, or a combination of any of europium, samarium, and ytterbium, and y ranges from 0 to about 0.1.

  10. Bandgap calculations and trends of organometal halide perovskites

    SciTech Connect (OSTI)

    Castelli, Ivano E., E-mail: ivca@fysik.dtu.dk; Thygesen, Kristian S.; Jacobsen, Karsten W. [Center for Atomic-scale Materials Design (CAMD), Department of Physics, Technical University of Denmark, DK 2800 Kgs. Lyngby (Denmark); García-Lastra, Juan María [Center for Atomic-scale Materials Design (CAMD), Department of Physics, Technical University of Denmark, DK 2800 Kgs. Lyngby (Denmark); Department of Energy Conversion and Storage, Technical University of Denmark, DK 4000 Roskilde (Denmark)

    2014-08-01T23:59:59.000Z

    Energy production from the Sun requires a stable efficient light absorber. Promising candidates in this respect are organometal perovskites (ABX{sub 3}), which have been intensely investigated during the last years. Here, we have performed electronic structure calculations of 240 perovskites composed of Cs, CH{sub 3}NH{sub 3}, and HC(NH{sub 2}){sub 2} as A-cation, Sn and Pb as B-ion, and a combination of Cl, Br, and I as anions. The calculated gaps span over a region from 0.5 to 5.0 eV. In addition, the trends over bandgaps have been investigated: the bandgap increases with an increase of the electronegativities of the constituent species, while it reduces with an increase of the lattice constants of the system.

  11. actinide halides technical: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University, Department of Engineering, Technical Report 97-25, December 1997. Based Pont, Michael J. 276 CERTIFICATE PROGRAM in TECHNICAL WRITING Biology and Medicine Websites...

  12. Bright Light-Emitting Diodes based on Organometal Halide Perovskite

    E-Print Network [OSTI]

    Tan, Zhi-Kuang; Moghaddam, Reza Saberi; Lai, May Ling; Docampo, Pablo; Higler, Ruben; Deschler, Felix; Price, Michael; Sadhanala, Aditya; Pazos, Luis M.; Credgington, Dan; Hanusch, Fabian; Bein, Thomas; Snaith, Henry J.; Friend, Richard H.

    2014-08-03T23:59:59.000Z

    a Keithley 2400 Source Measure Unit (SMU). Photon flux was measured simultaneously using a calibrated silicon photodiode centered over the light-emitting pixel. Radiance in W sr-1 m-2 and luminance in cd m-2 10 were calculated based...

  13. Still Photography Throwdown: Silver Halide vs. Silicon Journal: CIC18

    E-Print Network [OSTI]

    Fairchild, Mark D.

    -end consumer snapshots or low-end professional images. This market segment is often referred to as the prosumer

  14. Chemistry of lower valent actinide halides. Final report

    SciTech Connect (OSTI)

    Lau, K.H.; Hildenbrand, D.L.

    1992-01-01T23:59:59.000Z

    This research effort was concerned almost entirely with the first two members of the actinide series, thorium and uranium, although the work was later extended to some aspects of the neptunium-fluorine system in a collaborative program with Los Alamos National Laboratory. Detailed information about the lighter actinides will be helpful in modeling the properties of the heavier actinide compounds, which will be much more difficult to study experimentally. In this program, thermochemical information was obtained from high temperature equilibrium measurements made by effusion-beam mass spectrometry and by effusion-pressure techniques. Data were derived primarily from second-law analysis so as to avoid potential errors in third-law calculations resulting from uncertainties in spectroscopic and molecular constants. This approach has the additional advantage of yielding reaction entropies that can be checked for consistency with various molecular constant assignments for the species involved. In the U-F, U-Cl, and U-Br systems, all of the gaseous species UX, UX{sub 2}, UX{sub 3}, UX{sub 4}, and UX{sub 5}, where X represents the halogen, were identified and characterized; the corresponding species ThX, ThX{sub 2}, ThX{sub 3}, and ThX{sub 4} were studied in the Th-F, Th-Cl, and Th-Br systems. A number of oxyhalide species in the systems U-0-F, U-0-Cl, Th-0-F, and Th-O-Cl were studied thermochemically. Additionally, the sublimation thermodynamics of NpF{sub 4}(s) and NpO{sub 2}F{sub 2}(s) were studied by mass spectrometry.

  15. ammonium halides: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Introduction Ammonium nitrate (AN) finds a widespread applica- tion as both fertilizer and energetic material Utah, University of 31 Original article Ionic adsorption...

  16. astatine halides: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    such as Ar Neumark, Daniel M. 378 May 1, 1989 Vol. 14, No. 9 OPTICS LETTERS 441 Solid-state XeF(D-X)laser at 286nm Chemistry Websites Summary: in excess of 6 cm- 1 ....

  17. actinium halides: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    such as Ar Neumark, Daniel M. 413 May 1, 1989 Vol. 14, No. 9 OPTICS LETTERS 441 Solid-state XeF(D-X)laser at 286nm Chemistry Websites Summary: in excess of 6 cm- 1 ....

  18. Structure and Chemistry in Halide Lead-Tellurite Glasses

    SciTech Connect (OSTI)

    McCloy, John S.; Riley, Brian J.; Lipton, Andrew S.; Windisch, Charles F.; Washton, Nancy M.; Olszta, Matthew J.; Rodriguez, Carmen P.

    2013-02-11T23:59:59.000Z

    A series of TeO2-PbO glasses were fabricated with increasing fractions of mixed alkali, alkaline earth, and lanthanide chlorides. The glass and crystal structure was studied with Raman spectroscopy, nuclear magnetic resonance (NMR), X-ray diffraction, and electron microscopy. As the chloride fraction increased, the medium-range order in the glass decreased up to a critical point (~14 mass% of mixed chlorides), above which the glasses became phase-separated. Resulting phases are a TeO2/PbO-rich phase and a crystalline phase rich in alkali chlorides. The 125Te NMR indicates, contrary to previous studies, that Te site distribution did not change with increased concentrations of M+, M2+, and M3+ cations, but rather is controlled by the Te/Pb molar ratio. The 207Pb NMR shows that two Pb species exist and their relative concentration changes nearly linearly with addition of the mixed chlorides, indicating that the additives to the TeO2-PbO glass are accommodated by changing the Pb species. The 23Na and 35Cl NMR indicate that Na and Cl are distributed in the single-phase glass phase up to the critical point, and at higher concentrations partition to crystalline phases. Transmission electron microscopy shows that the sample at the critical point contains ~10 nm seed nuclei that increase in size and concentration with exposure to the electron beam.

  19. alkali halides irradiated: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are considered. We predict the major alkali and halogen species in a Pele-like volcanic gas and the major alklai and halogen condensates. We also model disequilibrium chemistry...

  20. alkali halides calorimetro: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are considered. We predict the major alkali and halogen species in a Pele-like volcanic gas and the major alklai and halogen condensates. We also model disequilibrium chemistry...

  1. Metal Halide Lamp Ballasts and Fixtures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment3311, 3312), OctoberMay 18-19,DepartmentEnergyMetal

  2. Replace Pressure-Reducing Valves with Backpressure Turbogenerators, Energy Tips: STEAM, Steam Tip Sheet #20 (Fact Sheet), Advanced Manufacturing Office (AMO), Energy Efficiency & Renewable Energy (EERE)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0 Replace Pressure-Reducing

  3. Proposal for the Purchase, Without a Call for Tenders, of Thyristor Assemblies to be Fitted into the PS Magnet Power Supply as Replacement for the Mercury-Arc Rectifiers

    E-Print Network [OSTI]

    1977-01-01T23:59:59.000Z

    Proposal for the Purchase, Without a Call for Tenders, of Thyristor Assemblies to be Fitted into the PS Magnet Power Supply as Replacement for the Mercury-Arc Rectifiers

  4. Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31T23:59:59.000Z

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

  5. Salt spray testing of sacrificial and barrier type coatings for the purpose of finding a corrosion resistant and environmentally acceptable replacement for cadmium plate

    SciTech Connect (OSTI)

    Schultz, E.J.; Haeberle, T.

    1996-12-31T23:59:59.000Z

    Cadmium plate is used to protect various components of offshore oil and gas production equipment from surface marine environments such as salt spray. This research project was performed to find an environmentally acceptable coating which provides equivalent or superior resistance to surface marine corrosion when compared to cadmium plate. In order to find a replacement for cadmium plate, a large number of sacrificial and barrier type coatings were exposed to an accelerated salt spray test in accordance with ASTM B117-94. The only sacrificial coating which resisted 1,000 hours of accelerated salt spray testing without any indication of failure was the 0.0006-in. thick zinc-nickel plate with an olive drab chromate treatment. Based on these test results, zinc-nickel plate is recommended as a corrosion resistant and environmentally acceptable replacement for cadmium plate for use in surface marine environments. Electroless nickel coatings with a minimum applied thickness of 0.002-in. also resisted 1,000 hours of accelerated salt spray testing without indication of failure. Electroless nickel is not recommended for corrosion resistance in salt spray environments for two reasons. Electroless nickel is susceptible to microcracking when heat treated at moderate to high temperatures. Heat treatment improves the hardness and resultant wear resistance of the coating. Microcracking will compromise the integrity of the coating resulting in pitting, cracking or crevice corrosion of the substrate in corrosive environments. Secondly, any significant mechanical damage to the coating or disbonding of the coating substrate interface will also result in corrosive attack of the substrate.

  6. Monitoring and evaluation of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached houses in Austin, Texas

    SciTech Connect (OSTI)

    Burns, R.; Hough, R.E. (Fleming (W.S.) and Associates, Inc., Syracuse, NY (United States))

    1991-10-01T23:59:59.000Z

    The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program in Austin, Texas. The City's Austin's Resource Management Department pursued this project to quantify the retrofit effect of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached homes. If successfully implemented, this retrofit program could help defer construction of a new power plant which is a major goal of this department. The project compares data collected from 12 houses during two cooling seasons under pre-retrofit and then post-retrofit air conditioner units. The existing low-efficiency air conditioners were monitored during the 1987 cooling season, replaced during the 1987--88 heating season with new, smaller sized, high-efficiency units, and then monitored again during the 1988 cooling season. Results indicated that the air conditioner retrofits reduce the annual air conditioner electric consumption and peak electric demand by an average of 38%. When normalized to the nominal capacity of the air conditioner, average demand savings were 1.12 W/ft{sup 2} and estimated annual energy savings were 1.419 kWh/ft{sup 2}. Individual air conditioner power requirements were found to be a well defined function of outdoor temperature as expected. In the absence of detailed data, estimates of the peak demand reductions of new air conditioners can be made from the manufacturer's specifications. Air conditioner energy consumption proved to be strongly linear as a function of the outdoor temperature as expected when taken as an aggregate. No noticeable differences in the diversity factor of the air conditioner usage were found. Analysis of the retrofit effect using PRISM yields estimates of the reduction in normalized annual consumption (NAC) and annual cooling consumption of 12% and 30%. 2 refs., 11 figs., 17 tabs.

  7. Scheduling screening inspections for replaceable and non-replaceable systems

    E-Print Network [OSTI]

    Aral, Bahadir

    2009-05-15T23:59:59.000Z

    . For instance, the American Cancer Society recommends three tests to detect signs of breast cancer: mammography, clinical breast exam and breast self-examination. Additionally, the American Medical Womens Association recommends annual mammography and clin- ical... cancer. For instance, mammography?s ability to detect a breast cancer when it is already started is estimated to 77.6% in (Houssami, Ciatto, Irwig, Simpson and Macaskill, 2002). Therefore, when designing screening inspection schedules, the fallibility...

  8. CHRPR Neutron Board Replacement Manual

    SciTech Connect (OSTI)

    Erikson, Rebecca L.; Myjak, Mitchell J.

    2013-03-31T23:59:59.000Z

    This document will walk through the steps to exchange the neutron channel boards with gamma channel boards in the CHRPR box.

  9. Helicopter aids transmission pole replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) Harmonicbet When yourecoveryG -HazmatLoadofthe

  10. Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

  11. Economic and Financial Costs of Saving Water and Energy: Preliminary Analysis for Hidalgo County Irrigation District No. 2 (San Juan) – Replacement of Pipeline Units I-7A, I-18, and I-22 

    E-Print Network [OSTI]

    Sturdivant, Allen W.; Rister, M. Edward; Lacewell, Ronald D.

    2007-01-01T23:59:59.000Z

    of replacing aged mortar-joint pipe in pipeline units I-7A, I-18, and I-22 with new rubber-gasketed, reinforced concrete pipe. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified...

  12. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Broader source: Energy.gov [DOE]

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  13. Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-202 October 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 – Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery... Canals, and On-Farm Delivery-Site Meters M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-202 October 2002 Economic and Conservation...

  14. DOE Media Advisory- DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy’s Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site.

  15. Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2003-01-01T23:59:59.000Z

    ’s Endorsement of RGIDECON © 1 This report contains economic and financial analyses results for a capital rehabilitation project proposed by the Cameron County Irrigation District No. 2 (a.k.a. San Benito) in the Rio Grande Basin. Readers interested...TR-212 March 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant M. Edward...

  16. Potential For Energy, Peak Demand, and Water Savings in California Tomato Processing Facilities

    E-Print Network [OSTI]

    Trueblood, A. J.; Wu, Y. Y.; Ganji, A. R.

    2013-01-01T23:59:59.000Z

    - wattage metal halide lamps. Other support areas may be lit by inefficient T12 lighting. Replacing these lamps with T5, T8, light-emitting diode (LED), or induction lighting can result in significant electrical energy savings and reduce the peak...

  17. Issues and recommendations related to replacement of CFC-114 at the uranium enrichment gaseous diffusion plant. Task title: Chlorofluorocarbon (CFC) Program Review, Final report, August 1, 1991--October 1, 1992

    SciTech Connect (OSTI)

    Anderson, B.L.; Banaghan, E.

    1993-03-31T23:59:59.000Z

    The operating uranium enrichment gaseous diffusion plants (GDPs) in Portsmouth, Ohio and Paducah, Kentucky, which are operated for the United States Department for Energy by Martin Marietta Energy Systems (MMES), currently use a chlorofluorocarbon (CFC-114) as the primary process stream coolant. Due to recent legislation embodied in the Clean Air Act, the production of this and other related chlorofluorocarbons (CFCS) are to be phased out with no production occurring after 1995. Since the plants lose approximately 500,000 pounds per year of this process stream coolant through various leaks, the GDPs are faced with the challenge of identifying a replacement coolant that will allow continued operation of the plants. MMES formed the CFC Task Team to identify and solve the various problems associated with identifying and implementing a replacement coolant. This report includes a review of the work performed by the CFC Task Team, and recommendations that were formulated based on this review and upon original work. The topics covered include; identifying a replacement coolant, coolant leak detection and repair efforts, coolant safety concerns, coolant level sensors, regulatory issues, and an analytical decision analysis.

  18. Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-09-01T23:59:59.000Z

    For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

  19. Halide and Oxy-Halide Eutectic Systems for High-Performance, High-Temperature Heat Transfer Fluids- FY13 Q2

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this University of Arizona project, funded by SunShot, for the second quarter of fiscal year 2013.

  20. NIST Special Publication 800-73-3 Interfaces for Personal Identity

    E-Print Network [OSTI]

    , Hildegard Ferraiolo, William MacGregor, of NIST, Ketan Mehta of Booz Allen Hamilton and Scott Guthery of HID

  1. Replacing the Rare Earth Intellectual Capital

    SciTech Connect (OSTI)

    Gschneidner, Jr., Karl

    2011-04-01T23:59:59.000Z

    The rare earth crisis slowly evolved during a 10 to 15 year period beginning in the mid-1980s, when the Chinese began to export mixed rare earth concentrates. In the early 1990s, they started to move up the supply chain and began to export the individual rare earth oxides and metals. By the late 1990s the Chinese exported higher value products, such as magnets, phosphors, polishing compounds, catalysts; and in the 21st century they supplied finished products including electric motors, computers, batteries, liquid-crystal displays (LCDs), TVs and monitors, mobile phones, iPods and compact fluorescent lamp (CFL) light bulbs. As they moved to higher value products, the Chinese slowly drove the various industrial producers and commercial enterprises in the US, Europe and Japan out of business by manipulating the rare earth commodity prices. Because of this, the technically trained rare earth engineers and scientists who worked in areas from mining to separations, to processing to production, to manufacturing of semifinished and final products, were laid-off and moved to other fields or they retired. However, in the past year the Chinese have changed their philosophy of the 1970s and 1980s of forming a rare earth cartel to control the rare earth markets to one in which they will no longer supply the rest of the world (ROW) with their precious rare earths, but instead will use them internally to meet the growing demand as the Chinese standard of living increases. To this end, they have implemented and occasionally increased export restrictions and added an export tariff on many of the high demand rare earth elements. Now the ROW is quickly trying to start up rare earth mines, e.g. Molycorp Minerals in the US and Lynas Corp. in Australia, to cover this shortfall in the worldwide market, but it will take about five years for the supply to meet the demand, even as other mines in the ROW become productive. Unfortunately, today there is a serious lack of technically trained personnel to bring the entire rare earth industry, from mining to original equipment manufacturers (OEM), up to full speed in the next few years. Accompanying this decline in technical expertise, innovation and new products utilizing rare earth elements has slowed dramatically, and it may take a decade or more to recapture America's leading role in technological advancements of rare earth containing products. Before the disruption of the US rare earth industry, about 25,000 people were employed in all aspects of the industry from mining to OEM. Today, only about 1,500 people are employed in these fields. The ratio of non-technically trained persons to those with college degrees in the sciences or engineering varies from about 8 to 1 to about 4 to 1, depending on the particular area of the industry. Assuming an average of 6 to 1, the number of college degree scientists and engineers has decreased from about 4,000 to 250 employed today. In the magnetic industry the approximate numbers are: 6,000 total with 750 technically trained people in the 1980s to 500 totally employed today of which 75 have degrees. The paucity of scientists and engineers with experience and/or training in the various aspects of production and commercialization of the rare earths is a serious limitation to the ability of the US to satisfy its own needs for materials and technologies (1) to maintain our military strength and posture, (2) to assume leadership in critical energy technologies, and (3) to bring new consumer products to the marketplace. The lack of experts is of even greater national importance than the halting in the 1990s and the recent restart of the mining/benification/separation effort in the US; and thus governmental intervention and support for at least five to 10 years will be required to ameliorate this situation. To respond quickly, training programs should be established in conjunction with a national research center at an educational institution with a long tradition in multiple areas of rare earth and other critical elements research and technology. This center should

  2. Sustainable LED Fluorescent Light Replacement Technology

    SciTech Connect (OSTI)

    None

    2011-06-30T23:59:59.000Z

    Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

  3. REPLACEMENT LAYING IN MARBLED MURRELETS BRACHYRAMPHUS MARMORATUS

    E-Print Network [OSTI]

    MCFARLANE TRANQUILLA, L., BRADLEY, R., PARKER, N., LANK, D. & COOKE, F. Journal:  Marine Ornithology ...

  4. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Gallix, R.

    1987-12-09T23:59:59.000Z

    U-shaped tiles placed end-to-end over a pair of parallel runners have two rods which engage L-shaped slots. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the wall. Resilient contact strips under the parallel sides of the U-shaped tile assure thermal and electrical contact with the wall. 6 figs.

  5. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Tsuo, Simon (Lakewood, CO), Langford, Alison A. (Boulder, CO)

    1989-01-01T23:59:59.000Z

    U-shaped limiter tiles placed end-to-end over a pair of parallel runners secured to a wall have two rods which engage L-shaped slots in the runners. The short receiving legs of the L-shaped slots are perpendicular to the wall and open away from the wall, while long retaining legs are parallel to and adjacent the wall. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the runners. Resilient contact strips between the parallel arms of the U-shaped tiles and the wall assure thermal and electrical contact with the wall.

  6. REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!

    E-Print Network [OSTI]

    presents a hazard for faculty, staff, and students in laboratory areas? Mercury also presents a hazard mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other generating hazardous waste from spill clean-up. · Mercury is volatile at room temperature with vapors

  7. Solid State Replacement of Rotating Mirror Cameras

    SciTech Connect (OSTI)

    Frank, A M; Bartolick, J M

    2006-08-25T23:59:59.000Z

    Rotating mirror cameras have been the mainstay of mega-frame per second imaging for decades. There is still no electronic camera that can match a film based rotary mirror camera for the combination of frame count, speed, resolution and dynamic range. The rotary mirror cameras are predominantly used in the range of 0.1 to 100 micro-seconds per frame, for 25 to more than a hundred frames. Electron tube gated cameras dominate the sub microsecond regime but are frame count limited. Video cameras are pushing into the microsecond regime but are resolution limited by the high data rates. An all solid state architecture, dubbed ''In-situ Storage Image Sensor'' or ''ISIS'', by Prof. Goji Etoh, has made its first appearance into the market and its evaluation is discussed. Recent work at Lawrence Livermore National Laboratory has concentrated both on evaluation of the presently available technologies and exploring the capabilities of the ISIS architecture. It is clear though there is presently no single chip camera that can simultaneously match the rotary mirror cameras, the ISIS architecture has the potential to approach their performance.

  8. Minimize environmental impacts when replacing underground pipe

    SciTech Connect (OSTI)

    Miller, L.R. [Ashland Petroleum Co., Catlettsburg, KY (United States); Kroll, T.R. [Insituform Technologies, Inc., Memphis, TN (United States)

    1997-02-01T23:59:59.000Z

    A US refiner urgently needed to repair a 40-year-old oily-water sewer system without disrupting processing operations. Equally important, the refiner wanted to minimize soil and groundwater contamination. In this case history, the refiner elected to use an alternative method--trenchless rehabilitation--to make required underground repairs.

  9. Collector main replacement at Indianapolis Coke

    SciTech Connect (OSTI)

    Sickle, R.R. Van

    1997-12-31T23:59:59.000Z

    Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

  10. Sampling with unequal probabilities and without replacement 

    E-Print Network [OSTI]

    Kleibrink, Ronald Gus

    1966-01-01T23:59:59.000Z

    . APPENDIX REFERENCES 29 iv LIST OF TABLES TABLE NO. PAGE Selection of n=4 from a Population of N=9 units Cumulative sizes, selection probabilities and y/x ratios for th N=9 samples from the Population of N=9 blocks Permutations for N=4 items Rand.... om permutati. ons for N=8 items Rand. om permutations for N=12 items 18 20 Number of applications of operations for N=9 24 Neans and correlations of three Populations considered 30 Var iances of estimates for Populations N=9, 13, 2...

  11. Optimization Online - Optimal scheduling for replacing perimeter ...

    E-Print Network [OSTI]

    Oleg Burdakov

    2014-10-02T23:59:59.000Z

    Oct 2, 2014 ... Citation: Technical Report LiTH-MAT-R–2014/09–SE, Department of Mathematics, Linkoping University, Sweden, August/2014. Download: ...

  12. Evaluation of alternative sign replacement strategies

    E-Print Network [OSTI]

    McCaleb, James Bradley

    1996-01-01T23:59:59.000Z

    of man can conceive and believe, it can achieve. " Napoleon Hill I want to thank my Heavenly Father for His love and the secuiity and peace that trusting my life to Him has brought. Several individuals played key roles in supporting and encouraging me... me to better myself; my in-laws for their love and support; and Alan Parham for his friendship and the coffee we shared through many long nights. I appreciate the opportunity that the Texas Department of Transportation has provided me to complete...

  13. Replacing Fluorescent Lightbulbs | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015of 2005UNS Electric,RMPipeline First Oil CeremonyCurriculumofEconomicAlthough

  14. Retail Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy usingof EnhancedRestructuring ourU.S.CALiPER Testing »

  15. Replaces DOE F 5120.2

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptemberAssessments | Department of Energy50.2 (07-95)700.2

  16. Replaces EIA-459E OMB Control No.

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptemberAssessments | Department of Energy50.25 (04-94)

  17. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal Heat PumpJorgeAtlGrad.Employee,

  18. Vapor pressures of mixtures of CFC-114 with the potential replacement coolants C{sub 4}F{sub 10} and c-C{sub 4}F{sub 8}

    SciTech Connect (OSTI)

    Trowbridge, L.D. [Oak Ridge K-25 Site, TN (United States); Otey, M.G. [Paducah Gaseous Diffusion Plant, KY (United States)

    1994-09-01T23:59:59.000Z

    The U.S. Enrichment Corporation`s production of isotopically enriched uranium depends solely on two plants which utilize the gaseous diffusion process. This process uses large quantities of CFC-114 as an evaporative coolant. CFC-114, however, will be phased out of production at the end of 1995 due to its potential to deplete stratospheric ozone. A search has been underway for substitutes for a number of years. The initial search (1988-89) for an ozone-friendly, commercially available, chemically compatible substitute yielded two candidates, FC-c318 (c-C{sub 4}F{sub 8}) and FC-3110 (C{sub 4}F{sub 10}). The intended mode of replacing coolant was to stage the new coolant into independent subsystems of the plants, so that some systems would continue to operate on CFC-114, and an increasing number would operate on the new coolant. During that changeover process, the possibility of coolant mixing arises in variety of scenarios. This work was intended to generate sufficient experimental information to be able to predict the vapor pressure of coolant mixtures over the range of operating conditions likely to be found in the diffusion plants. Specifically, vapor pressures were measured over the temperature range 322 to 355 K (120{degrees}F to 180{degrees}F) and over the full range of mole fractions for binary mixtures of CFC-114 with FC-3110, and of CFC-114 with FC-c318.

  19. High Permeability Ternary Palladium Alloy Membranes with Improved Sulfur and Halide Tolerances

    SciTech Connect (OSTI)

    K. Coulter

    2010-12-31T23:59:59.000Z

    The project team consisting of Southwest Research Institute{reg_sign} (SwRI{reg_sign}), Georgia Institute of Technology (GT), the Colorado School of Mines (CSM), TDA Research, and IdaTech LLC was focused on developing a robust, poison-tolerant, hydrogen selective free standing membrane to produce clean hydrogen. The project completed on schedule and on budget with SwRI, GT, CSM, TDA and IdaTech all operating independently and concurrently. GT has developed a robust platform for performing extensive DFT calculations for H in bulk palladium (Pd), binary alloys, and ternary alloys of Pd. Binary alloys investigated included Pd96M4 where M = Li, Na, Mg, Al, Si, Sc, Ti, V, Cr, Mn, Fe, Co, Ni, Cu, Zn, Ga, Y, Zr, Nb, Mo, Tc, Ru, Rh, Ag, Cd, In, Sn, Sb, Te, Hf, Ta, W, Re, Os, Ir, Pt, Au, Tl, Pb, Bi, Ce, Sm, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu. They have also performed a series of calculations on Pd{sub 70}Cu{sub 26}Ag{sub 4}, Pd{sub 70}Cu{sub 26}Au{sub 4}, Pd{sub 70}Cu{sub 26}Ni{sub 4}, Pd{sub 70}Cu{sub 26}Pt{sub 4}, and Pd{sub 70}Cu{sub 26}Y{sub 4}. SwRI deposited and released over 160 foils of binary and ternary Pd alloys. There was considerable work on characterizing and improving the durability of the deposited foils using new alloy compositions, post annealing and ion bombardment. The 10 and 25 {micro}m thick films were sent to CSM, TDA and IdaTech for characterization and permeation testing. CSM conducted over 60 pure gas permeation tests with SwRI binary and ternary alloy membranes. To date the PdAu and PdAuPt membranes have exhibited the best performance at temperatures in the range of 423-773 C and their performance correlates well with the predictions from GT. TDA completed testing under the Department of Energy (DOE) WGS conditions on over 16 membranes. Of particular interest are the PdAuPt alloys that exhibited only a 20% drop in flux when sulfur was added to the gas mixture and the flux was completely recovered when the sulfur flow was stopped. IdaTech tested binary and ternary membranes on a simulated flue gas stream and experienced significant difficulty in mounting and testing the sputter deposited membranes. IdaTech was able to successfully test PdAu and PdAuPt membranes and saw similar sulfur tolerance to what TDA found. The Program met all the deliverables on schedule and on budget. Over ten presentations at national and international conferences were made, four papers were published (two in progress) in technical journals, and three students (2 at GT and 1 at CSM) completed their doctorates using results generated during the course of the program. The three major findings of program were; (1) the DFT modeling was verified as a predictive tool for the permeability of Pd based ternary alloys, (2) while magnetron sputtering is useful in precisely fabricating binary and ternary alloys, the mechanical durability of membranes fabricated using this technique are inferior compared to cold rolled membranes and this preparation method is currently not ready for industrial environments, (3) based on both modeling and experimental verification in pure gas and mixed gas environments PdAu and PdAuPt alloys were found to have the combination of the highest permeability and tolerance to sulfur.

  20. Method to synthesize dense crystallized sodalite pellet for immobilizing halide salt radioactive waste

    DOE Patents [OSTI]

    Koyama, Tadafumi (Tokyo, JP)

    1994-01-01T23:59:59.000Z

    A method for immobilizing waste chloride salts containing radionuclides such as cesium and strontium and hazardous materials such as barium. A sodalite intermediate is prepared by mixing appropriate amounts of silica, alumina and sodium hydroxide with respect to sodalite and heating the mixture to form the sodalite intermediate and water. Heating is continued to drive off the water to form a water-free intermediate. The water-free intermediate is mixed with either waste salt or waste salt which has been contacted with zeolite to concentrate the radionuclides and hazardous material. The waste salt-intermediate mixture is then compacted and heated under conditions of heat and pressure to form sodalite with the waste salt, radionuclides and hazardous material trapped within the sodalite cage structure. This provides a final product having excellent leach resistant capabilities.