1

Superfund Policy Statements and Guidance Regarding Disposition of Radioactive Waste in Non-NRC Licensed Disposal Facilities - 13407  

SciTech Connect (OSTI)

This talk will discuss EPA congressional testimony and follow-up letters, as well as letters to other stakeholders on EPA's perspectives on the disposition of radioactive waste outside of the NRC licensed disposal facility system. This will also look at Superfund's historical practices, and emerging trends in the NRC and agreement states on waste disposition. (author)

Walker, Stuart [U.S. Environmental Protection Agency (United States)] [U.S. Environmental Protection Agency (United States)

2013-07-01T23:59:59.000Z

2

Guidance  

Broader source: Energy.gov [DOE]

This site provides a centralized topical resource for enforceable DOE and federal health, safety and security requirements and related guidance documents. DOE’s guidance documents support understanding, ensure technical and management capabilities and collaborative improvement efforts.

3

NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398  

SciTech Connect (OSTI)

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)

McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.; Mohseni, Aby [U.S. Nuclear Regulatory Commission, Mail Stop T8F5, 11545 Rockville Pike, Rockville, MD 20852 (United States)] [U.S. Nuclear Regulatory Commission, Mail Stop T8F5, 11545 Rockville Pike, Rockville, MD 20852 (United States)

2013-07-01T23:59:59.000Z

4

Status of the NRC Decommissioning Program  

SciTech Connect (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

5

STATUS OF THE NRC'S DECOMMISSIONING PROGRAM  

SciTech Connect (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

Orlando, D. A.; Camper, L. W.; Buckley, J.

2002-02-25T23:59:59.000Z

6

Guidance Systems Division ,  

Office of Legacy Management (LM)

Oockec No. 10-0772 Oockec No. 10-0772 22 OCT 1981 Bcndlx CorporaLion ' Guidance Systems Division , ATTN: Mr. Wf 11 la,,, Hnrr,,or Manngar, PlanL Englne0rtny Teterboro, New Jersey 07608 uwm STATES NUCLEAll I-IEOULATOIJY COMMISSION REGION i 631 PARK A"LH"I KIN0 OF PR"ISIA. PCNNIVLVANIA ID40' Gentlemen: Subject: Inspectfon 81-15 _ "-- .,; .z .;; Thts refers to the closeout safety \nspectlon conducted by Ms. M. Campbell of this office on August 27, 1961, of activities formerly authorized by NRC License No. STB-424 and to the c!lscussions of our findings held by f4s. Campbell with yourseif aL Lhe conclusion of the inspection. This closeout inspection. was conducted as part of an NRC effort to ensure that facilities where,llcensed activities were forxrrly conducted meet current NRC criteria for release for

7

Regulatory guidance document  

SciTech Connect (OSTI)

The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM`s evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7.

NONE

1994-05-01T23:59:59.000Z

8

Guidance | Department of Energy  

Energy Savers [EERE]

Guidance Guidance NEPA Guidance by Agency Council on Environmental Quality Department of Energy Environmental Protection Agency Other NEPA Guidance and Reports NEPA Guidance by...

9

Technical Guidance  

Broader source: Energy.gov [DOE]

The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

10

RH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

Washington TRU Solutions LLC

2008-01-12T23:59:59.000Z

11

RH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

Washington TRU Solutions LLC

2006-11-07T23:59:59.000Z

12

NRC - regulator of nuclear safety  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations.

NONE

1997-05-01T23:59:59.000Z

13

Standards, Guidance and Practices for Improved Data Quality  

SciTech Connect (OSTI)

Since the mid 1980s, the Idaho National Laboratory (INL) has been involved with numerous projects to collect operational reactor data, develop data tools, and trend and analyze that data for the U.S. Nuclear Regulatory Commission (NRC). Because the data are used in subsequent risk analyses, the NRC must have confidence in the quality of the data delivered. The NRC tasked the INL to establish a comprehensive data quality assurance program. A key element of that effort was to establish a set of requirements based on industry and government standards, guidance and good practices. This paper discusses where these were found, the process of extracting the requirements and recommendations from the source materials, and the consolidation of them into a concise set of 22 standards, guidance and practices for technical data quality. While this set was created specifically for the data programs within the NRC’s Office of Research, they have broad application to many high-technology industries.

Martin B. Sattison

2010-06-01T23:59:59.000Z

14

NRC Construction Light Source Flicker: What We  

E-Print Network [OSTI]

frequency] (CFF) ·Health - World Health Organization (1947): · ...a state of complete physical, mental Handbook: Reference & Application (9th Ed.), 2000, p. 3-20 #12;NRC Construction Flicker Effects 1;NRC Construction Flicker Problem 2 ·Does it matter what light source produces the flicker

California at Davis, University of

15

ARRA Guidance  

Broader source: Energy.gov (indexed) [DOE]

GUIDANCE FOR MODIFICATIONS GUIDANCE FOR MODIFICATIONS AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) This guidance is for contracting officers who are obligating ARRA funds on existing contracts. 1. All contracts obligating ARRA funds shall include the applicable contract language referenced in Flash 2009-28 if this language has not already been added to the subject instrument. The modification incorporating the ARRA unique terms and conditions must be added by a bilateral modification to the contract. 2. ARRA funding has unique tracking and reporting requirements. The Recovery Act funds must remain segregable from obligation through costing and disbursement. Recovery Act funds must be disbursed by September 30, 2015. Contracting Officers should so notify their impacted contractors.

16

POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM 19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the...

17

Nuclear safety information sharing agreement between NRC and...  

Office of Environmental Management (EM)

Nuclear safety information sharing agreement between NRC and DOE's Office of Environment, Health, Safety and Security Nuclear safety information sharing agreement between NRC and...

18

NRC okays nuclear merger at Entergy Corp  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission (NRC) has approved the consolidation of Entergy Corp's nuclear operations into the utility's proposed nuclear management company, Entergy Operations Inc. The NRC action is a significant step in a consolidation process that would place operational responsibility for Entergy's nuclear plants in Mississippi, Arkansas, and Louisiana with Entergy Operations. The NRC action would authorize transfer of the operating licenses for Arkansas Nuclear One (ANO) at Russellville, Ark, Waterford-3 at Taft, La, and Grand Gulf-1 at Port Gibson, Miss, to Entergy Operations. A consolidated nuclear organization will allow for a more focused management structure in its nuclear operations and will result in greater operational efficiencies.

Not Available

1990-02-01T23:59:59.000Z

19

Regulatory guidance on soil cover systems  

SciTech Connect (OSTI)

The US Nuclear Regulatory Commission (NRC) in September 1991, completed revisions to 14 sections of the Standard Review Plan (SRP) for the Review of a License Application for a Low-Level Radioactive Waste Disposal Facility. The major purposes of the SRP are to ensure the quality and uniformity of the NRC staff`s safety reviews, and to present a well-defined base from which to evaluate the acceptability of information and data provided in the Safety Analysis Report (SAR) portion of the license application. SRP 3.2, entitled, Design Considerations for Normal and Abnormal/Accident Conditions, was one of the sections that was revised by the NRC staff. This revision was completed to provide additional regulatory guidance on the important considerations that need to be addressed for the proper design and construction of soil cover systems that are to be placed over the LLW. The cover system over the waste is acknowledged to be one of the most important engineered barriers for the long-term stable performance of the disposal facility. The guidance in revised SRP 3.2 summarizes the previous efforts and recommendations of the US Army Corps of Engineers (COE), and a peer review panel on the placement of soil cover systems. NRC published these efforts in NUREG/CR-5432. The discussions in this paper highlight selected recommendations on soil cover issues that the NRC staff considers important for ensuring the safe, long-term performance of the soil cover systems. The development phases to be discussed include: (1) cover design; (2) cover material selection; (3) laboratory and field testing; (4) field placement control and acceptance; and (5) penetrations through the constructed covers.

Kane, J.D. [Nuclear Regulatory Commission, Washington, DC (United States)

1991-12-31T23:59:59.000Z

20

NRC Solomons RFQ | Open Energy Information  

Open Energy Info (EERE)

Solomons RFQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NRC Solomons RFQLegal Published NA Year Signed or Took Effect 2014...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EPRI/NRC-RES fire human reliability analysis guidelines.  

SciTech Connect (OSTI)

During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting a fire HRA. This process includes identification and definition of post-fire human failure events, qualitative analysis, quantification, recovery, dependency, and uncertainty. This document provides three approaches to quantification: screening, scoping, and detailed HRA. Screening is based on the guidance in NUREG/CR-6850, with some additional guidance for scenarios with long time windows. Scoping is a new approach to quantification developed specifically to support the iterative nature of fire PRA quantification. Scoping is intended to provide less conservative HEPs than screening, but requires fewer resources than a detailed HRA analysis. For detailed HRA quantification, guidance has been developed on how to apply existing methods to assess post-fire fire HEPs.

Lewis, Stuart R. (Electric Power Research Institute, Charlotte, NC); Cooper, Susan E. (U.S. Nuclear Regulatory Commission, Rockville, MD); Najafi, Bijan (SAIC, Campbell, CA); Collins, Erin (SAIC, Campbell, CA); Hannaman, Bill (SAIC, Campbell, CA); Kohlhepp, Kaydee (Scientech, Tukwila, WA); Grobbelaar, Jan (Scientech, Tukwila, WA); Hill, Kendra (U.S. Nuclear Regulatory Commission, Rockville, MD); Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff (Scientech, Tukwila, WA)

2010-03-01T23:59:59.000Z

22

RH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this program guidance document is to provide technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the SARP and/or C of C shall govern. The C of C states: ''...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, ''Operating Procedures,'' of the application.'' It further states: ''...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, ''Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with 10 CFR {section} 71.11, ''Deliberate Misconduct.'' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions. Following these instructions assures that operations are safe and meet the requirements of the SARP. This document is available on the Internet at: ttp://www.ws/library/t2omi/t2omi.htm. Users are responsible for ensuring they are using the current revision and change notices. Sites may prepare their own document using the word-for-word steps in th is document, in sequence, including Notes and cautions. Site specific information may be included as necessary. The document, and revisions, must then be submitted to CBFO at sitedocuments@wipp.ws for approval. A copy of the approval letter from CBFO shall be available for audit purposes. Users may develop site-specific procedures addressing preoperational activities, quality assurance (QA), hoisting and rigging, and radiation health physics to be used with the instructions contained in this document. Users may recommend changes to this document by submitting their recommendations (in writing) to the WIPP M&O Contractor RH Packaging Maintenance Engineer for evaluation. If approved, the change(s) will be incorporated into this document for use by ALL users. Before first use and every 12 months after, user sites will be audited to this document to ensure compliance. They will also be audited within one year from the effective date of revisions to this document.

Washington TRU Solutions, LLC

2003-08-25T23:59:59.000Z

23

Regulatory guidance for lightning protection in nuclear power plants  

SciTech Connect (OSTI)

Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects. (authors)

Kisner, R. A.; Wilgen, J. B.; Ewing, P. D.; Korsah, K. [Oak Ridge National Laboratory, P. O. Box 2008, Oak Ridge, TN 37831-6007 (United States); Antonescu, C. E. [U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

24

Regulatory Guidance for Lightning Protection in Nuclear Power Plants  

SciTech Connect (OSTI)

Abstract - Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects.

Kisner, Roger A [ORNL; Wilgen, John B [ORNL; Ewing, Paul D [ORNL; Korsah, Kofi [ORNL; Antonescu, Christina E [ORNL

2006-01-01T23:59:59.000Z

25

NRC Monitoring of Salt Waste Disposal at the Savannah River Site - 13147  

SciTech Connect (OSTI)

As part of monitoring required under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA), the NRC staff reviewed an updated DOE performance assessment (PA) for salt waste disposal at the Saltstone Disposal Facility (SDF). The NRC staff concluded that it has reasonable assurance that waste disposal at the SDF meets the 10 CFR 61 performance objectives for protection of individuals against intrusion (chap.61.42), protection of individuals during operations (chap.61.43), and site stability (chap.61.44). However, based on its evaluation of DOE's results and independent sensitivity analyses conducted with DOE's models, the NRC staff concluded that it did not have reasonable assurance that DOE's disposal activities at the SDF meet the performance objective for protection of the general population from releases of radioactivity (chap.61.41) evaluated at a dose limit of 0.25 mSv/yr (25 mrem/yr) total effective dose equivalent (TEDE). NRC staff also concluded that the potential dose to a member of the public is expected to be limited (i.e., is expected to be similar to or less than the public dose limit in chap.20.1301 of 1 mSv/yr [100 mrem/yr] TEDE) and is expected to occur many years after site closure. The NRC staff used risk insights gained from review of the SDF PA, its experience monitoring DOE disposal actions at the SDF over the last 5 years, as well as independent analysis and modeling to identify factors that are important to assessing whether DOE's disposal actions meet the performance objectives. Many of these factors are similar to factors identified in the NRC staff's 2005 review of salt waste disposal at the SDF. Key areas of interest continue to be waste form and disposal unit degradation, the effectiveness of infiltration and erosion controls, and estimation of the radiological inventory. Based on these factors, NRC is revising its plan for monitoring salt waste disposal at the SDF in coordination with South Carolina Department of Health and Environmental Control (SCDHEC). DOE has completed or begun additional work related to salt waste disposal to address these factors. NRC staff continues to evaluate information related to the performance of the SDF and has been working with DOE and SCDHEC to resolve NRC staff's technical concerns. (authors)

Pinkston, Karen E.; Ridge, A. Christianne; Alexander, George W.; Barr, Cynthia S.; Devaser, Nishka J.; Felsher, Harry D. [U.S. Nuclear Regulatory Commission (United States)] [U.S. Nuclear Regulatory Commission (United States)

2013-07-01T23:59:59.000Z

26

Sample Form DOE NRC 740M  

National Nuclear Security Administration (NNSA)

CONCISE NOTE CONCISE NOTE DOE/NRC FORM 740M (6-2008) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 Estimated burden per response to comply with this mandatory collection request: 45 minutes. This information is required to satisfy the provisions of the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records and FOIA Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0057), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not

27

Physical Inventory Listing NRC 742c2  

National Nuclear Security Administration (NNSA)

9. TOTALS 9. TOTALS U.S. DEPARTMENT OF ENERGY AND U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL INVENTORY LISTING DOE/NRC FORM 742C (7-2008) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 8. BATCH DATA of Page Estimated burden per response to comply with this mandatory collection request: 6 hours. This information is required by NRC to fulfill its safeguards responsibilities, bilateral agreements, and responsibilities as a participant in the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and

28

Microsoft PowerPoint - 5_Pat Smith_NMMSS_2013_Presentation_NRC...  

National Nuclear Security Administration (NNSA)

Reconciliation Pat Smith PSI NRC Lead NRC Reconciliation NRC Reconciliation requirements per NUREGBR-0007, Rev. 6 All RIS's must submit an MSR (Material Summary Report)...

29

Microsoft PowerPoint - Upcoming NMMSS Training 120811-NRC comments...  

National Nuclear Security Administration (NNSA)

Date Course Location December 2-4, 2014 NRC - NMMSS I * Germantown, MD February 10-13, 2015 DOE - NMMSS I Germantown, MD March 24-26, 2015 NRC - NMMSS I * Germantown, MD June...

30

DOE Petitions for NRC Review in Yucca Mountain Proceeding | Department...  

Broader source: Energy.gov (indexed) [DOE]

Petitions for NRC Review in Yucca Mountain Proceeding DOE Petitions for NRC Review in Yucca Mountain Proceeding April 12, 2010 - 10:16am Addthis The United States Department of...

31

Microsoft Word - 0906 NMMSS News DOE NRC Approved.doc  

National Nuclear Security Administration (NNSA)

, Pat Tana of the Nuclear Regulatory Commission (NRC) passed away unexpectedly from a heart attack. Pat worked at the NRC for more than 25 years, the majority of which were in...

32

Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance Guidance Guidance Cybersecurity These documents are currently under revision and awaiting management review and approval Cybersecurity Strategy - 2011 Cybersecurity Architecture - 2011 OMB Requirements Enterprise Architecture Enterprise Architecture Transition Plan - April 2011 Enterprise Architecture Guidance Records Management Centers of Excellence (pdf) Procedures and Instructions Records Management Handbook Design Criteria Standard for Electronic Records Management Software Applications NARA Bulletin 2011-02, Guidance on Managing Records in Web 2.0/Social Media Platforms NWM 27 2010, NARA Guidance for Developing Media Neutral Records Schedules and Notifications to NARA for Previously Scheduled Permanent Records NWM NARA Bulletin 2010-05, Guidance on Manageing Records in Cloud

33

Guidance for UMTRA project surveillance and maintenance  

SciTech Connect (OSTI)

The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

NONE

1986-01-01T23:59:59.000Z

34

Material Balance Report NRC 742_7  

National Nuclear Security Administration (NNSA)

MATERIAL BALANCE REPORT MATERIAL BALANCE REPORT 1. NAME AND ADDRESS MATERIAL ACCOUNTABILITY NRC FORM 742 (7-2008) (PREVIOUS EDITIONS ARE OBSOLETE) 4. REPORT PERIOD (MM/DD/YYYY) PRINTED ON RECYCLED PAPER Estimated burden per response to comply with this mandatory collection request: 5 hours. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0004), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB

35

Implementation of NUREG 1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

This paper discusses the implementation of a quality assurance program that fulfills the requirements of the U.S. Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements for the identification of items and activities important to public radiological safety and waste isolation for placement on a Q-List and Quality Activities List and also for graded application of QA measures. The process and organization for implementing this guidance is discussed.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA)

1990-10-01T23:59:59.000Z

36

Implementation of NUREG-1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

The US Department of Energy`s Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ``Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements`` for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

1990-04-01T23:59:59.000Z

37

Buy American Program Guidance  

Broader source: Energy.gov [DOE]

Guidance on the Buy American provision as applied to Energy Efficiency and Renewable Energy Projects funded by the American Recovery and Reinvestment Act of 2009. Office of EERE Guidance effective December 17, 2009.

38

Child Guidance Techniques.  

E-Print Network [OSTI]

TDOC Z TA24S.7 8873 NO.1314 Child Guidance Techniques The Texas MM University System ~ Texas Agricultural Extension Service DMia! C. Pfannstiel . Director College Station B-1314 ... 2 Contents Helpful Guidance T echniques...

Fraiser, Roberta C.

1982-01-01T23:59:59.000Z

39

Management Transition Guidance  

Broader source: Energy.gov (indexed) [DOE]

Records and Information Records and Information Management Transition Guidance November 2013 Records and Information Management Transition Guidance i Records and Information Management Transition Guidance Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction and Purpose ..................................................................................................... 1 LM Records Functions ................................................................................................................ 1 2.0 The Records Life Cycle ....................................................................................................... 2 3.0 Organizational Responsibilities ........................................................................................... 2

40

DOE Replies Support NRC Commissioners and Authority to Withdraw Yucca  

Broader source: Energy.gov (indexed) [DOE]

Replies Support NRC Commissioners and Authority to Withdraw Replies Support NRC Commissioners and Authority to Withdraw Yucca Application DOE Replies Support NRC Commissioners and Authority to Withdraw Yucca Application July 19, 2010 - 4:07pm Addthis In a reply brief filed with the NRC today, DOE explained that the arguments that it lacked authority to withdraw the pending Yucca Mountain license application are uniformly without merit. DOE's reply brief is available here. In a separate filing, DOE explained that there is no basis for arguments that two NRC Commissioners should recuse themselves from the Yucca proceeding. That brief is available here. Addthis Related Articles DOE Makes Filing with NRC in Support OF Authority to Withdraw Yucca Application DOE Defends Its Motion to Withdraw Yucca Mountain Application DOE Opposes Injunction Motion

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

o:\informs\fixforms\nrc741.wpf  

Broader source: Energy.gov (indexed) [DOE]

FORM 741 FORM 741 (5-2002) Previous editions are obsolete MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 þ þ þ þ þ þ 23a. MISCELLANEOUS NUCLEAR MATERIAL TRANSACTION REPORT Estimated burden per response to comply with this mandatory collection request: 1 hr and 15 minutes. This information is required for IAEA accounting reports that show changes in inventory of nuclear materials. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0003), Office of Management and Budget, Washington, DC 20503. If a means used to

42

LCC Guidance Rates  

Broader source: Energy.gov [DOE]

Notepad text file provides the LCC guidance rates in a numbered format for the various regions throughout the U.S.

43

wind_guidance  

Broader source: Energy.gov [DOE]

Guidance to Accompany Non-Availability Waiver of the Recovery Act Buy American Provisions for 5kW and 50kW Wind Turbines

44

QA in Design Guidance  

Broader source: Energy.gov [DOE]

This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM.

45

High Performance and Sustainable Buildings Guidance | Department...  

Energy Savers [EERE]

High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance More Documents &...

46

Information and Records Management Transition Guidance | Department...  

Energy Savers [EERE]

Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

47

Worker Health & Safety Policy, Guidance & Reports  

Broader source: Energy.gov [DOE]

The Office of Worker Safety and Health Policy establishes Departmental expectations for worker safety and health through the development of rules, directives and guidance. Worker safety and health policy will ensure that workers are adequately protected from hazards associated with DOE sites and operations and reflect national worker safety and health laws, regulations and standards where applicable.

48

NRC Transportation Security (Part 73 SNF Update and Part 37 Category...  

Office of Environmental Management (EM)

NRC Transportation Security (Part 73 SNF Update and Part 37 Category 1 and 2 Materials) NRC Transportation Security (Part 73 SNF Update and Part 37 Category 1 and 2 Materials) NRC...

49

Codes and standards and other guidance cited in regulatory documents  

SciTech Connect (OSTI)

As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

Nickolaus, J.R.; Bohlander, K.L.

1996-08-01T23:59:59.000Z

50

Introducing BEST PRACTICE GUIDANCE  

E-Print Network [OSTI]

placement 6. Application of sewage sludges and composts 7. Fertiliser application in land regeneration 8Introducing BEST PRACTICE GUIDANCE FOR LAND REGENERATION Best Practice Guidance for Land of brownfield land for woodland and urban greening after uses. The Notes are devised for practitioners and all

51

Guidance for Planning Exercises  

Broader source: Energy.gov (indexed) [DOE]

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

52

ARM - Social Media Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CenterSocial Media Guidance CenterSocial Media Guidance Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance Social Media Guidance Comments The ARM Climate Research Facility (ARM) welcomes comments on our website, blog, and our social media sites such as Facebook, Flickr, and YouTube. Comments are welcome at any time; however, responses to comments will

53

EMSL: Proposal Guidance:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

54

QA in Design Guidance  

Broader source: Energy.gov (indexed) [DOE]

9 9 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT Guidance Document for Integrating Quality Assurance During the Design and Construction Life Cycle September 2011 Page 2 of 29 FOREWORD This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM. A project's Quality Assurance Program assigns responsibilities and authorities, defines policies and requirements, and provides for the performance and assessment of work that provides confidence that required level of quality is achieved, commensurate with the various project requirements. This guidance document offers for evaluation, by project personnel from EM and contractor

55

GENII Guidance Document  

Broader source: Energy.gov (indexed) [DOE]

GENII Computer Code GENII Computer Code Application Guidance for Documented Safety Analysis Final Report U.S. Department of Energy Office of Environment, Safety, and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 July 2004 GENII Guidance Report July 2004 Final Report INTENTIONALLY BLANK ii GENII Guidance Report July 2004 Final Report FOREWORD This document provides guidance to Department of Energy (DOE) facility analysts in the use of the GENII computer code for supporting Documented Safety Analysis applications. Information is provided herein that supplements information found in the GENII documentation provided by the code developer. GENII is one of six computer codes designated by the DOE Office of Environmental, Safety and Health as a toolbox code for safety analysis.

56

Oral Presentation Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Revised 04/01/2011 Page 1 of 2 Revised 04/01/2011 Page 1 of 2 09 ORAL PRESENTATION GUIDANCE The following guidance is not intended to replace or circumvent any existing agency-level guidance or regulation; the guidance is intended to enhance the agency's effectiveness when interviewing potential Energy Service Company (ESCOs). NOTE: Use for down selection of two or more ESCOs INSTRUCTIONS * Preplan your interview(s) * Be prepared o Decide whether to have video conference; webinar, telephonically or face-to-face interview (recommended). o Meet with the Acquisition Team (including your DOE Project Facilitator) at least one hour prior to the first ESCO interview. o Prepare questions and discussion issues based on the Team's comments and concerns. * Be brief o Recommend scheduling a 1 or 1-1/2 hour for each interview.

57

Enforcement Guidance Supplement  

Broader source: Energy.gov (indexed) [DOE]

EGS:01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors.

58

Oral Presentation Guidance  

Broader source: Energy.gov (indexed) [DOE]

Revised 04/01/2011 Page 1 of 2 Revised 04/01/2011 Page 1 of 2 09 ORAL PRESENTATION GUIDANCE The following guidance is not intended to replace or circumvent any existing agency-level guidance or regulation; the guidance is intended to enhance the agency's effectiveness when interviewing potential Energy Service Company (ESCOs). NOTE: Use for down selection of two or more ESCOs INSTRUCTIONS * Preplan your interview(s) * Be prepared o Decide whether to have video conference; webinar, telephonically or face-to-face interview (recommended). o Meet with the Acquisition Team (including your DOE Project Facilitator) at least one hour prior to the first ESCO interview. o Prepare questions and discussion issues based on the Team's comments and concerns. * Be brief o Recommend scheduling a 1 or 1-1/2 hour for each interview.

59

Codes and standards and other guidance cited in regulatory documents. Revision 1  

SciTech Connect (OSTI)

As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. In addition to updating previous information, Revision 1 adds citations from the NRC Inspection Manual and the Improved Standard Technical Specifications. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and the Standard Review Plan (NUREG-0800).

Ankrum, A.; Nickolaus, J.; Vinther, R.; Maguire-Moffitt, N.; Hammer, J.; Sherfey, L.; Warner, R. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

60

NRC review of the CANDU-3 reactor design  

SciTech Connect (OSTI)

This paper presents an overview of the US Nuclear Regulatory Commission's (NRC's) effort to complete an early review of the Canada deuterium uranium (CANDU)-3 reactor design prior to formal submittal of an application for standard design certification. The NRC is conducting a review of the CANDU-3 design in support of a request by AECL Technologics, the US sponsor of the design. The purpose of this review is to encourage early interactions by applicants, vendors, and government agencies with the NRC. The CANDU-3 design is being developed by Atomic Energy of Canada, Limited (AECL), whose CANDU operations are based in Mississauga, Ontario. AECL Technologies, a US subsidiary of AECL, Incorporated, informed the NRC of its intent to seek design certification of the CANDU-3 design under the provisions of 10CFR52 in a letter to the NRC dated May 25, 1989. This paper describes the commission's basis for this type of early review, its purposes and objectives, key elements of the review, the intended product, and the schedule.

Kennedy, J.L. (Nuclear Regulatory Commission, Washington, DC (United States))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Army Guidance for UESCs  

Broader source: Energy.gov (indexed) [DOE]

of 11 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil 071400AUG2008 ARMY STRONG Army Policy Guidance for Utility Energy Services Contracts presented at The Federal Utility Partnership Working Group 5 MAY 2009 by Randy Smidt Headquarters Dept of Army, Office of the Assistant Chief of Staff for Installation Management 2 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil 071400AUG2008 ARMY STRONG Overview of Army UESC Program & Draft Policy Guidance * Army UESC Program * Draft Policy Guidance o Organizations, responsibilities & relationships o Procedures o Management & Execution o Resource Requirements o Reporting Requirements o Case Studies 3 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil

62

CH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

Washington TRU Solutions LLC

2005-02-28T23:59:59.000Z

63

CH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

Washington TRU Solutions LLC

2003-04-30T23:59:59.000Z

64

CH Packaging Program Guidance  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

Washington TRU Solutions LLC

2002-03-04T23:59:59.000Z

65

NEPA Contracting Reform Guidance  

Broader source: Energy.gov (indexed) [DOE]

defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

66

o:\informs\fixforms\nrc740m.wpf  

Broader source: Energy.gov (indexed) [DOE]

CONCISE NOTE CONCISE NOTE DOE/NRC FORM 740M (5-2002) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 Estimated burden per response to comply with this mandatory collection request: 45 minutes. This information is required to satisfy the provisions of the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0057), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to

67

o:\informs\fixforms\nrc742c.wpf  

Broader source: Energy.gov (indexed) [DOE]

. TOTALS . TOTALS U.S. DEPARTMENT OF ENERGY AND U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL INVENTORY LISTING DOE/NRC FORM 742C (8-2003) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 8. BATCH DATA of Page Estimated burden per response to comply with this mandatory collection request: 6 hours. This information is required by NRC to fulfill its safeguards responsibilities, bilateral agreements, and responsibilities as a participant in the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

68

Policy Guidance Memorandum | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Policy Guidance Memorandum Policy Guidance Memorandum Documents Available for Download POLICY GUIDANCE MEMORANDUM 12 Payment of Expenses for Professional Credentials Departmental...

69

Records and Information Management Transition Guidance (November...  

Energy Savers [EERE]

Records and Information Management Transition Guidance (November 2013) Records and Information Management Transition Guidance (November 2013) This guidance document establishes a...

70

SORN Template and Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SORN Template and Guidance SORN Template and Guidance Privacy Act System of Records Notice (PDF) System of Record Notice template with guidance in a Microsoft Word format....

71

Guidance Document Cryogenic Liquids  

E-Print Network [OSTI]

Guidance Document Cryogenic Liquids [This is a brief and general summary. Read the full MSDS for more details before handling.] Introduction: All cryogenic liquids are gases at normal temperature liquefies them. Cryogenic liquids are kept in the liquid state at very low temperatures. Cryogenic liquids

72

Engineering Library Guidance  

E-Print Network [OSTI]

Science & Engineering Library Library Guidance April 2014 1 #12;Contents 1 Overview of Waseda University Library 2 Science & Engineering Library and the Student Reading Room 3 WINE: Waseda's Library Catalog3 WINE: Waseda's Library Catalog 4 Library Services 5 Notes 2 #12;How many libraries

Kaji, Hajime

73

Building Energy Use Benchmarking Guidance  

Broader source: Energy.gov [DOE]

Guidance describes the Energy Independence and Security Act of 2007 section 432 requirement for benchmarking Federal facilities.

74

NRC Institute for Fuel Cell Innovation | Open Energy Information  

Open Energy Info (EERE)

NRC Institute for Fuel Cell Innovation NRC Institute for Fuel Cell Innovation Jump to: navigation, search Logo: NRC Institute for Fuel Cell Innovation Name NRC Institute for Fuel Cell Innovation Address 4250 Wesbrook Mall Place Vancouver, Canada Zip V6T 1W5 Number of employees 201-500 Phone number 604-221-3000 Coordinates 49.2460722°, -123.2326432° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.2460722,"lon":-123.2326432,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

75

PRESENTATION TO NRC BURNING PLASMA PANEL DR. STEPHEN O. DEAN  

E-Print Network [OSTI]

1 PRESENTATION TO NRC BURNING PLASMA PANEL DR. STEPHEN O. DEAN PRESIDENT FUSION POWER ASSOCIATES REACTORS ! FISSION PRODUCT DEACTIVATION ! HAZARDOUS WASTE PROCESSING ! RECYCLING OF MATERIALS ! FUSION ! UNRESOLVED WASTE DISPOSAL ISSUE EPRI DID PREPARE TWO REPORTS ON FUSION, IN 1992 AND 1994 ! Report of the 1992

76

Introduction To GIS Course Syllabus Introduction to GIS NRC585  

E-Print Network [OSTI]

- 1 ­ Introduction To GIS Course Syllabus Introduction to GIS ­ NRC585 Lecture: Tues. 11 Hours: by appointment Email: bbradley@eco.umass.edu Email: efusco@cns.umass.edu Website: http://people.umass.edu/bethanyb/gis.html Course Objective: To provide an understanding of the basic concepts and uses of GIS technology

Schweik, Charles M.

77

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers [EERE]

DRAFT FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of...

78

Enhancement of NRC station blackout requirements for nuclear power plants  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

McConnell, M. W. [United States Nuclear Regulatory Commission, Mail Stop: 012-H2, Washington, DC 20555 (United States)

2012-07-01T23:59:59.000Z

79

EPAct 2005 Metering Guidance Overview  

Broader source: Energy.gov (indexed) [DOE]

EPAct 2005 Metering Guidance EPAct 2005 Metering Guidance Overview Dave Hunt Pacific Northwest National Laboratory Section 103 Requirements * What to meter - Building electric usage - All buildings * How to meter - Standard meters - Advanced meters * When - by 10/1/2012 FEMP's Response * Metering guidance document * Agency planning workshops * Metering training course * Metering Best Practices Guide (FY 2007) Important Dates * August 3, 2006 - agency plans due * As determined by individual agencies - site metering plans * October 1, 2012 - compliance deadline Issues * Funding * Practicability * EPAct time-based rate schedule * Agency policies/guidance Potential Roles for Utilities * Guidance/updates on time-based pricing * Metering services * Finance installations * Other? Useful Documents

80

GUIDANCE REGARDING NEPA REGULATIONS  

Broader source: Energy.gov (indexed) [DOE]

This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] GUIDANCE REGARDING NEPA REGULATIONS 40 CFR Part 1500 Executive Office of the President Council on Environmental Quality 722 Jackson Place, N.W. Washington, D.C. 20006 July 22, 1983 Memorandum For: Heads of Federal Agencies From: A. Alan Hill, Chairman Re: Guidance Regarding NEPA Regulations The Council on Environmental Quality (CEQ) regulations implementing the National Environmental Policy Act (NEPA) were issued on November 29, 1978. These regulations became effective for, and binding upon, most federal agencies on July 30, 1979, and for all remaining federal agencies on November 30, 1979. As part of the Council's NEPA oversight responsibilities it solicited through an August 14,

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NRC TLD Direct Radiation Monitoring Network. Progress report, July--September 1993: Volume 13, No. 3  

SciTech Connect (OSTI)

This report provides the status and results of the NRC Thermoluminescent Dosimeter (TLD) Direct Radiation Monitoring Network. It presents the radiation levels measured in the vicinity of NRC licensed facilities throughout the country for the third quarter of 1993.

Struckmeyer, R.

1993-11-01T23:59:59.000Z

82

DOE Makes Filing with NRC in Support OF Authority to Withdraw...  

Broader source: Energy.gov (indexed) [DOE]

today urged the NRC to conclude that DOE has the legal authority to withdraw the pending Yucca Mountain license application. DOE argued that the NRC should review and reverse the...

83

Weatherization and Intergovernmental Program: Closeout Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Guidance Program Guidance Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Closeout Guidance to someone by E-mail Share Weatherization and Intergovernmental Program: Closeout Guidance on Facebook Tweet about Weatherization and Intergovernmental Program: Closeout Guidance on Twitter Bookmark Weatherization and Intergovernmental Program: Closeout Guidance on Google Bookmark Weatherization and Intergovernmental Program: Closeout Guidance on Delicious Rank Weatherization and Intergovernmental Program: Closeout Guidance on Digg Find More places to share Weatherization and Intergovernmental Program: Closeout Guidance on AddThis.com... Closeout Guidance Recovery Act Monitoring & Reporting National Environmental Policy Act

84

Federal Energy Management Program: Energy Management Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Management Energy Management Guidance to someone by E-mail Share Federal Energy Management Program: Energy Management Guidance on Facebook Tweet about Federal Energy Management Program: Energy Management Guidance on Twitter Bookmark Federal Energy Management Program: Energy Management Guidance on Google Bookmark Federal Energy Management Program: Energy Management Guidance on Delicious Rank Federal Energy Management Program: Energy Management Guidance on Digg Find More places to share Federal Energy Management Program: Energy Management Guidance on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules Guidance Facility Reporting Fleet Reporting Energy Management Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal

85

Weatherization and Intergovernmental Program: Program Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Guidance Program Guidance Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Program Guidance to someone by E-mail Share Weatherization and Intergovernmental Program: Program Guidance on Facebook Tweet about Weatherization and Intergovernmental Program: Program Guidance on Twitter Bookmark Weatherization and Intergovernmental Program: Program Guidance on Google Bookmark Weatherization and Intergovernmental Program: Program Guidance on Delicious Rank Weatherization and Intergovernmental Program: Program Guidance on Digg Find More places to share Weatherization and Intergovernmental Program: Program Guidance on AddThis.com... Closeout Guidance Recovery Act Monitoring & Reporting National Environmental Policy Act

86

Spreading The Word: Capital Market Consequences of Business Press Coverage of Management Earnings Guidance  

E-Print Network [OSTI]

1 I. INTRODUCTION Management earnings guidance is a primary means by which the market adjusts its expectations of firms? earnings performance (Penman 1980; Cotter et al. 2006; Beyer et al. 2010).1 One of the main reasons managers choose... provides 59 percent of all accounting-based information used by the market, while Cotter et al. (2006) report that 47 percent of analysts revise their forecasts within five days after guidance. Note that I use the terms ?management earnings guidance...

Twedt, Brady J

2013-06-21T23:59:59.000Z

87

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the  

Broader source: Energy.gov (indexed) [DOE]

Supplement 03-01 Supplemental Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR subpart C." That EGS, in part, delineated a set of criteria that OE would use to determine whether to apply its enforcement discretion, in this case through the use of Consent Orders. Those criteria provided both guidance to DOE contractors regarding situations for which the use of

88

o:\informs\fixforms\nrc742_3.wpf  

Broader source: Energy.gov (indexed) [DOE]

MATERIAL TYPE MATERIAL TYPE (Submit separate report for each type) U.S. DEPARTMENT OF ENERGY AND U.S. NUCLEAR REGULATORY COMMISSION MATERIAL BALANCE REPORT 1. NAME AND ADDRESS MATERIAL ACCOUNTABILITY NRC FORM 742 (8-2003) (PREVIOUS EDITIONS ARE OBSOLETE) 4. REPORT PERIOD (MM/DD/YYYY) PRINTED ON RECYCLED PAPER Estimated burden per response to comply with this mandatory collection request: 5 hours. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0004),

89

Recommendations for NEAMS Engagement with the NRC: Preliminary Report  

SciTech Connect (OSTI)

The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

Bernholdt, David E [ORNL

2012-06-01T23:59:59.000Z

90

NRC Enforcement Policy Review, July 1995-July 1997  

SciTech Connect (OSTI)

On June 30, 1995, the Nuclear Regulatory Commission (NRC) issued a complete revision of its General Statement of Policy and Procedure for Enforcement Action (Enforcement Policy) (60 FR 34381). In approving the 1995 revision to the Enforcement Policy, the Commission directed the staff to perform a review of its implementation of the Policy after approximately 2 years of experience and to consider public comments. This report represents the results of that review.

Lieberman, J.; Pedersen, R.M.

1998-04-01T23:59:59.000Z

91

Equivalence of safety requirements between CANDU and US NRC requirements  

SciTech Connect (OSTI)

The Canada deuterium uranium (CANDU) technology has been built on an original pressurized heavy-water reactor (PHWR) concept, which has several characteristics different from those of light water reactors (LWRs). However, the philosophy of defense-in-depth, based on multiple levels of safety and implemented through the provision of several physical and functional barriers against the release of radioactivity to the environment, is applied to both types of reactor. It is not surprising, therefore, that there is conceptual convergence of safety objectives between the CANDU and the LWR designs, which in turn translates into an equivalence of CANDU safety requirements with the US Nuclear Regulatory Commission (NRC) requirements established for LWRS. The demonstration of this safety requirements equivalence has been an important activity for the licensing of CANDU reactors in countries whose regulatory environment has been influenced by the NRC approach and has more recently acquired a special emphasis in the context of a preapplication review of an advanced CANDU design, the CANDU 3, for its design certification in the United States. This paper highlights results of a comparative exercise dealing with the fundamental principles of the CANDU safety philosophy and the corresponding NRC requirements.

Azeez, S.; Bonechi, M. (Sheridan Park Research Community, Mississauga, Ontario (Canada)); Rib, L. (AECL Technologies, Rockville, MD (United States))

1993-01-01T23:59:59.000Z

92

Commissioning Guidance for ESPCs  

Broader source: Energy.gov (indexed) [DOE]

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

93

Policy and Guidance Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Protection, Sustainability Support & Corporate Safety Analysis Environmental Protection, Sustainability Support & Corporate Safety Analysis HS-20 Home Mission & Functions » Office of Nuclear Safety, Quality Assurance & Environment » Sustainability Support » Environmental Policy & Assistance » Corporate Safety Programs » Analysis Program Contacts What's New? Sustainability Support Environment Corporate Safety Programs Analysis Environment Environmental Policy Environmental Guidance Environmental Reports Environmental Management System Radiation Protection Environmental Compliance Environmental Justice Environmental Training Environmental Tools Search Our Documents Topics & Resources Air Analytical Services Program CERCLA Cultural & Natural Resources DOE Comments on Rulemakings Federal Environmental Laws

94

CEQ Environmental Justice Guidance  

Broader source: Energy.gov (indexed) [DOE]

JUSTICE JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 ii Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Principles for Considering Environmental Justice under NEPA . . . . . . . . . . . . . 8 1. General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2. Additional Considerations . . . . . . . . . . . . . . . . . . . . . .

95

Federal Real Property Council Guidance  

Broader source: Energy.gov (indexed) [DOE]

Federal Real Property Council Federal Real Property Council Guidance for Improved Asset Management December 22, 2004 Federal Real Property Council Guidance for Improved Asset Management Table of Contents I. Overview............................................................................. 1 II. Guiding Principles .................................................................... 3 III. Asset Management Plan - Required Components............................... 4 IV. Asset Management Plan - "Shelf Document".................................. 5 V. Inventory Data Elements and Performance Measures Definitions.......... 26 i Federal Real Property Council Guidance for Improved Asset Management I. Overview On February 4, 2004, President Bush signed Executive Order 13327, "Federal Real Property

96

O&M Metering Guidance  

Broader source: Energy.gov [DOE]

Presentation covers the O&M Metering Guidance and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

97

EMI/RFI and Power Surge Withstand Guidance for the U.S. Nuclear Regulatory Commission  

SciTech Connect (OSTI)

This paper discusses the regulatory guidance implemented by U.S. NRC for minimizing malfunctions and upsets in safety-related instrumentation and control (I and C) systems in nuclear power plants caused by electromagnetic interference (EMI), radio-frequency interference (RFI), and power surges. The engineering design, installation, and testing practices deemed acceptable to U.S. NRC are described in Regulatory Guide (RG) 1.180, ''Guidelines for Evaluating Electromagnetic and Radio-Frequency in Safety-Related Instrumentation and Control Systems'' (January 2000) and in a Safety Evaluation Report (SER) endorsing EPRI TR-102323, ''Guidelines for Electromagnetic Interference Testing in Power Plants,'' (April 1996). These engineering practices provide a well-established, systematic approach for ensuring electromagnetic compatibility (EMC) and surge withstand capability (SWC).

Ewing, PD

2001-09-07T23:59:59.000Z

98

Enforcement Guidance Supplements (EGS)  

Broader source: Energy.gov (indexed) [DOE]

Supplements (EGS) Supplements (EGS) EGS 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions (09/23/2005) EGS 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria (09/05/2003) EGS 03-01: Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 (07/21/2003) EGS 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation (02/21/2002) EGS 01-02: Management and Independent Assessment (12/17/2001) EGS 01-01: Nuclear Weapons Program Enforcement Issues (10/15/2001) EGS 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C (10/26/2000) EGS 00-03: Specific Issues on Applicability of 10 CFR 830 (09/12/2000)

99

Peer Review of NRC Standardized Plant Analysis Risk Models  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

Anthony Koonce; James Knudsen; Robert Buell

2011-03-01T23:59:59.000Z

100

Going the Distance? NRC's Response to the National Academy of Science's Transportation Study  

SciTech Connect (OSTI)

In February 2006, the National Academy of Sciences (NAS) published the results of a 3 1/2-year study, titled Going the Distance, that examined the safety of transporting spent nuclear fuel (SNF) and high level waste (HLW) in the United States. NAS initiated this study to address what it perceived to be a national need for an independent, objective, and authoritative analysis of SNF and HLW transport in the United States. The study was co-sponsored by the U.S. Nuclear Regulatory Commission (NRC), the U.S. Department of Energy (DOE), the U.S. Department of Transportation (DOT), the Electric Power Research Institute and the National Cooperative Highway Research Program. This paper addresses some of the recommendations made in the NAS study related to the performance of SNF transportation casks in long duration fires, the use of full-scale package testing, and the need for an independent review of transportation security prior to the commencement of large scale shipping campaigns to an interim storage site or geologic repository. In conclusion: The NRC believes that the current regulations in 10 CFR Part 71 for the design of SNF and HLW transportation packages provide a very high level of protection to the public for very severe accidents and credible threat scenarios. As recommended by the NAS study, additional studies of accidents involving severe fires have been completed. These studies have confirmed that spent fuel casks would be expected to withstand very severe fires without the release of any fission products from the spent fuel. Additionally, changes in rail operating procedures such as the use of dedicated trains and prohibition on the co-location of SNF and flammable liquids in rail tunnels can further reduce the already low probability of severe rail accident fires involving SNF and HLW. (authors)

Easton, E.P.; Bajwa, C.S. [United States Nuclear Regulatory Commission, Washington, DC (United States)

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Guidance & Opinions | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance & Opinions Guidance & Opinions Guidance & Opinions Contractor Relations Guidance on Accessing Contractor and Subcontractor Employment Records Arbitration Guidance for Management and Operating Contractors Guidance on Meetings with Union Officials Political Activity at DOE Facilities and by DOE Contractors Opinion on Contractor Participation in the Federal Hiring Process Guidance on Inherently Governmental Functions Guidance on Electric Vehicle Recharging Stations Safety Regulations Interpretations INTERPRETATION REGARDING EXEMPTION RELIEF UNDER 10 C.F.R. PART 820, SUBPART E, EXEMPTION RELIEF, AND NON-COMPLIANT 'DOCUMENTED SAFETY ANALYSES' SUBJECT TO 10 C.F.R. PART 830, NUCLEAR SAFETY MANAGEMENT, SUBPART B, SAFETY BASIS REQUIREMENTS INTERPRETATION REGARDING THE APPLICATION OF DOE TECHNICAL STANDARD

102

POLICY GUIDANCE MEMORANDUM #03 Addressing Missclassified Positions...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Addressing Missclassified Positions POLICY GUIDANCE MEMORANDUM 03 Addressing Missclassified Positions This memorandum provides policy guidance on how to consistently address...

103

Additional Guidance Regarding Application of Current Procedures...  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

104

EPA - Guidance for Incorporating Environmental Justice Concerns...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: EPA - Guidance for Incorporating Environmental Justice Concerns in EPA's NEPA...

105

Standardized Permit Guidance | Open Energy Information  

Open Energy Info (EERE)

Permit Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Standardized Permit GuidanceLegal Abstract Standardized...

106

State Energy Program Guidance | Department of Energy  

Energy Savers [EERE]

Program for Program Year 2014. Program Year 2014 SEP Formula Grant Guidance Effective March 19, 2014 2013 Program Guidance SEP and Energy Efficiency Conservation Block Grant...

107

Seismic Design Expectations Report  

Broader source: Energy.gov [DOE]

The Seismic Design Expectations Report (SDER) is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project seismic design activities prior to...

108

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning...  

Broader source: Energy.gov (indexed) [DOE]

for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual...

109

Information Systems Engineering Guidance (ISEG)  

Broader source: Energy.gov (indexed) [DOE]

Departmental Information Systems Engineering (DISE) Departmental Information Systems Engineering (DISE) Guidance Volume 2 Managing DOE IT Projects March 26, 2002 Revised December 27, 2002 Developed by the Software Quality and Systems Engineering Program Office of the Chief Information Officer Departmental Information Systems Engineering Guidance Title Page Document Series: Departmental Information Systems Engineering (DISE) Guidance Document Name: Volume 2, Managing DOE IT Projects Publication Date: 03/26/03, Revised 12/27/02 Document Owner: Office of the Chief Information Officer Software Quality and Systems Engineering Brenda Coblentz, IM-21, Program Manager Acknowledgement: Wayne Jones, author of the DOE (HQ) IM Project Management Guide, September 1998

110

All NEPA Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance & Requirements » Guidance » All NEPA Guidance Guidance & Requirements » Guidance » All NEPA Guidance All NEPA Guidance Council on Environmental Quality Guidance Final Guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act (2012) Appropriate Use of Mitigation and Monitoring and Clarifying the Appropriate Use of Mitigated Findings of No Significant Impact (2011) Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions under NEPA (2010) Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA (2010) A Citizen's Guide to the NEPA: Having Your Voice Heard (2007) Guidance on the Consideration of Past Actions in Cumulative Effects Analysis (2005) Memorandum for Federal NEPA Contacts: Emergency Actions and

111

Microsoft PowerPoint - 8_Peter Habighorst_NRC_Act of 2012-status...  

National Nuclear Security Administration (NNSA)

General licenses 8 NRC Internal actions, cont. * Exports to power reactors in Canada, Germany and Japan were identified: - KNK, THTR, AVR, JOYO, FUGEN, Bruce * General licenses...

112

Microsoft PowerPoint - 2_Peter J. Habighorst_NRC Remarks 2013...  

National Nuclear Security Administration (NNSA)

General licenses 8 NRC Internal actions, cont. * Exports to power reactors in Canada, Germany and Japan were identified: - KNK, THTR, AVR, JOYO, FUGEN, Bruce * General licenses...

113

Microsoft Word - NMMSS Newsletter October 2014 Final-NRC 10-16...  

National Nuclear Security Administration (NNSA)

to the DOENNSA-NRC NMMSS Community The NMMSS staff has updated the D-22, NMMSS Reports Description Directory. This directory provides complete, concise descriptions of...

114

Army Policy Guidance for UESCs  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—provides an overview of the U.S. Army's utility energy service contract (UESC) program and its UESC draft policy guidance.

115

NEPA Contracting Reform Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contracting Reform Guidance Contracting Reform Guidance NEPA Contracting Reform Guidance This documents provides guidance on NEPA contracting strategy, including: defining the work of the contractor; establishing contracts ahead of time; minimizing cost while maintaining quality. Guidance also provides: model statements of work, direction on NEPA contract management by NEPA Document Manager; a system for measuring NEPA costs and for evaluating contractor procedures; details on the DOE NEPA website. NEPA Contracting Reform Guidance More Documents & Publications NEPA Contracting Reform Guidance (December 1996) Statement of Work-National Environmental Policy Act (NEPA) Support Services Acquisition: Preparation and Review of Environmental Impact Statements, Environmental Assessments, Environmental Reports, and other Environmental

116

Selected Guidance & Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

117

Guidance & Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

118

Proposed modifications of NRC's standard review plan for seismic analysis  

Science Journals Connector (OSTI)

The paper briefly describes the major changes in seismic analysis and design criteria proposed in the U.S. NRC Standard Review Plan. The changes to the SRP also reflect the resolution of Unresolved Safety Issue (USI) A-40, “Seismic Design Criteria”. The proposed revision provides explicit guidelines for (1) developing site-specific spectra; (2) determination of suitable design time history (ies); (3) the location of seismic input motion; (4) developing floor response spectra; (5) soil-structure interaction (SSI) analysis; (6) analysis of above-ground Seismic Category 1 tanks; and (7) analysis of buried piping and structures. The proposed revision, together with its background material, was issued for public comments on 19 May, 1988, together with a solicitation to address specific questions related to SSI analysis. These are discussed in the paper. The paper concludes with a note on the importance of the progress made and outlines the areas requiring further studies and research.

G. Bagchi; D. Jeng; H. Ashar

1990-01-01T23:59:59.000Z

119

Roadmap to NRC Approval of Ceramic Matrix Composites in Generation IV Reactors  

SciTech Connect (OSTI)

This report provides an initial roadmap to obtain Nuclear Regulatory Commission (NRC) approval for using these material systems in a nuclear application. The possible paths taken to achieving NRC approval are necessarily subject to change as this is an on-going process that shifts as more data and a clearer understanding of the nuclear regulations are gathered.

M. G. Jenkins; E. Lara-Curzio; W. Windes

2006-05-01T23:59:59.000Z

120

Seismic Design Expectations Report  

Broader source: Energy.gov (indexed) [DOE]

Seismic Design Expectations Report Seismic Design Expectations Report March 2010 CD- This Rev of th Se -0 view Module w he overall Cons OFFICE O eismic De C CD-1 was used to dev struction Projec inco OF ENVIRO Standard esign Exp Critical Deci CD-2 M velop the Revie ct Review cond orporated in the ONMENTA Review Pla pectation ision (CD) A C March 2010 ew Plan for the ducted in 2009 e current versio AL MANAG an (SRP) ns Report Applicability D-3 e Oak Ridge Bl 9. Lessons lear on of the Modu GEMENT t (SDER) CD-4 ldg. 3019 60% rned from this r ule. ) Post Ope design review review have be eration w as part een Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Microsoft PowerPoint - 5_Pat Smith_NMMSS_2013_Presentation_NRC Reconciliation.pptx  

National Nuclear Security Administration (NNSA)

Reconciliation Reconciliation Pat Smith PSI NRC Lead NRC Reconciliation  NRC Reconciliation requirements per NUREG/BR-0007, Rev. 6  All RIS's must submit an MSR (Material Summary Report) (Form 742, 742C) to NMMSS under the following conditions: - A RIS has a reportable quantity as of their inventory date - A RIS has shipped or received a reportable quantity during the material balance reporting period NRC Reconciliation  All NRC licensees are required to report their physical inventory to NMMSS each year if they: - possess one gram or more of special nuclear material (SNM) (plutonium, uranium-233, or uranium-235 contained in enriched uranium) - one kilogram or more of foreign obligated source material (natural uranium, depleted uranium, or thorium) are required to report their physical inventory to NMMSS each

122

Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis  

SciTech Connect (OSTI)

Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

OHara, J.M.; Higgins, J.C.

2010-01-31T23:59:59.000Z

123

Energy Management Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance Guidance Energy Management Guidance October 8, 2013 - 1:53pm Addthis The Federal Energy Management Program (FEMP) provides guidance on Federal laws and regulations related to energy management. General Guidance for Facilities Overview of Federal Energy Management Policy and Mandates: Guidance document outlining Federal energy management goals and requirements for Federal energy managers. Sustainability Requirement Crosswalk: Crosswalk of sustainability and energy goals and targets within executive orders and other statutes. Guidelines Establishing Criteria for Excluding Buildings from the Energy Performance Requirements of Section 543 of the National Energy Conservation Policy Act as Amended by the Energy Policy Act of 2005 (EPAct 2005): Guidelines that established criteria for exclusions from the energy

124

Internal Controls Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Internal Controls Guidance Internal Controls Guidance Internal Controls Guidance Guidance required to be implemented by Departmental elements to meet the requirements of the Federal Managers' Financial Integrity Act (FMFIA), as described in Office of Management and Budget (OMB) Circular A-123, Management's Responsibility for Internal Control. This guidance provides instructions for conducting internal controls evaluations and help ensure the Secretary's annual Statement of Assurance is accurate and adequately supported. Internal Control Evaluations Guidance More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy Request for Information - Operations and Maintenance (O & M) Support

125

Nuclear safety information sharing agreement between NRC and DOE’s Office of Environment, Health, Safety and Security  

Broader source: Energy.gov [DOE]

Nuclear safety information sharing agreement between NRC and DOE’s Office of Environment, Health, Safety and Security.

126

Review of Technical Studies in the United States in Support of Burnup Credit Regulatory Guidance  

SciTech Connect (OSTI)

Taking credit for the reduction in reactivity associated with fuel depletion can enable more cost-effective, higher-density storage, transport, disposal, and reprocessing of spent nuclear fuel (SNF) while maintaining sufficient subcritical margin to establish an adequate safety basis. Consequently, there continues to be considerable interest in the United States (U.S.), as well as internationally, in the increased use of burnup credit in SNF operations, particularly related to storage, transport, and disposal of commercial SNF. This interest has motivated numerous technical studies related to the application of burnup credit, both domestically and internationally, as well as the design of SNF storage, transport and disposal systems that rely on burnup credit for maintaining subcriticality. Responding to industry requests and needs, the U.S. Nuclear Regulatory Commission (NRC) initiated a burnup credit research program in 1999, with support from the Oak Ridge National Laboratory (ORNL), to develop regulatory guidance and the supporting technical bases for allowing and expanding the use of burnup credit in pressurized-water reactor SNF storage and transport applications. Although this NRC research program has not been continuous since its inception, considerable progress has been achieved in many key areas in terms of increased understanding of relevant phenomena and issues, availability of relevant information and data, and subsequently updated regulatory guidance for expanded use of burnup credit. This paper reviews technical studies performed by ORNL for the U.S. NRC burnup credit research program. Examples of topics include reactivity effects associated with reactor operating characteristics, fuel assembly characteristics, burnable absorbers, control rods, spatial burnup distributions, cooling time, and assembly misloading; methods and data for validation of isotopic composition predictions; methods and data for validation of criticality calculations; and operational issues and data related to assembly burnup confirmation. The objective of this paper is to summarize the work and significant accomplishments, with references to the technical reports and publications for complete details, and provide a useful resource to others in the burnup credit community.

Wagner, John C [ORNL] [ORNL; Parks, Cecil V [ORNL] [ORNL; Mueller, Don [ORNL] [ORNL; Gauld, Ian C [ORNL] [ORNL

2010-01-01T23:59:59.000Z

127

EPAct 2005 Metering Guidance Overview | Department of Energy  

Energy Savers [EERE]

EPAct 2005 Metering Guidance Overview EPAct 2005 Metering Guidance Overview Presentation covers an overview of the EPAct 2005 Metering Guidance and is given at the FUPWG 2006...

128

Policy Guidance Memorandum #36 SES Competitive Staffing Procedures...  

Broader source: Energy.gov (indexed) [DOE]

6 SES Competitive Staffing Procedures Policy Guidance Memorandum 36 SES Competitive Staffing Procedures Policy Guidance Memorandum 36 provides overarching policy guidance and...

129

Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations...  

Energy Savers [EERE]

Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency...

130

Guidance on GENII computer code - July 6, 2004 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Guidance on GENII computer code - July 6, 2004 Guidance on GENII computer code - July 6, 2004 July 6, 2004 GENII Computer Code Application Guidance for Documented Safety Analysis...

131

Renewable Energy Requirement Guidance for EPAct 2005 and Executive...  

Energy Savers [EERE]

Renewable Energy Requirement Guidance for EPAct 2005 and Executive Order 13423 Renewable Energy Requirement Guidance for EPAct 2005 and Executive Order 13423 Guidance specifies...

132

POLICY GUIDANCE MEMORANDUM #18 Advertisement of Federal Career...  

Broader source: Energy.gov (indexed) [DOE]

Intern Program Employment Opps (Expired) THIS GUIDANCE HAS EXPIRED Guidance on advertising positions under the Federal Career Intern Program (FCIP) POLICY GUIDANCE MEMORANDUM...

133

Implementation Guidance, Drug Testing - December 3, 2007 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and...

134

Distillate Stocks Expected  

Gasoline and Diesel Fuel Update (EIA)

4 4 Notes: So let's get to what you want to know. What do we expect this upcoming winter? When EIA's demand forecast is combined with its outlook for production and net imports, distillate stocks are projected to remain towards the lower end of the normal range. We are forecasting about an 11 million barrel build between the end of July 2001 and the end of November 2001, slightly more than the average over the past 5 years (10 million barrels), but less than the average of the last 10 years (15 ½ million barrels). If, however, economic incentives are high enough, distillate stocks could build more, resulting in a higher distillate stock level heading into the winter. Of course, the reverse is true as well, if for example, the distillate fuel refining spread declines substantially. Since 1994,

135

Policy Standards, Guidance and Statutes  

Broader source: Energy.gov [DOE]

Policy Guidance and Statutes, DOE Standards, STD, Atomic Energy Act, Table, Draft DOE P, American Indian Religiuos Freedom, CERCLA, RCRA, Clean Air ACt, Clean Water Act, Emergency Planing and Community, Federal Environmental Laws, Surface Contamination Guidelines, DOE STD-1196-2011, Derived Concentration Technical Standard, ALARA, 0173T

136

Communications and Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and Guidance and Guidance Communications and Guidance Issued Guidance: Throughout the life of the Recovery Act, it has at times been necessary to issue guidance around certain policies or procedures. DOE Interim Guidance on Recipient Signage (May 2010) Buy American Act Guidance Davis-Bacon Compliance Guidance on Recovery Act Logo Usage (March 2009) Recovery Act Memos: Special reports written on cross-cutting themes of Recovery Act impact. Small Businesses Helping Drive Economy: Clean Energy, Clean Sites (March 2010) Transforming America's Transportation Sector: Batteries and Electric Vehicles (pdf) (July 2010) Help with Federal Reporting.gov: Recovery Act recipients are required to report to FederalReporting.gov once every quarter. While the process can be complicated, here you will find a DOE specific guide through the process.

137

Guidance on measuring and reporting Greenhouse Gas  

E-Print Network [OSTI]

Guidance on measuring and reporting Greenhouse Gas (GHG) emissions from freight transport This guidance provides clear instructions on calculating the greenhouse gas (GHG) emissions from freight and report your greenhouse gas emissions', by providing more specific information and examples relating

138

DOE Releases Federal Building Metering Guidance  

Broader source: Energy.gov [DOE]

The guidance requires federal agencies to review, revise, and submit to FEMP its metering implementation plan within one year.

139

Guidance Regarding NEPA Regulations | Department of Energy  

Energy Savers [EERE]

guidance on several topics: scoping, categorical exclusions, adoption procedures, contracting provisions, selection of alternatives in licensing and permitting situations, and...

140

California Energy Commission GUIDANCE ON WASTE  

E-Print Network [OSTI]

California Energy Commission GUIDANCE GUIDANCE ON WASTE MANAGEMENT PLANS FOR ENERGY EFFICIENCY) obtain waste management plans for each proposed project receiving funding under the Energy Efficiency of waste. The Energy Commission is providing the following guidance to assist recipients of EECBG Program

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Broader source: Energy.gov (indexed) [DOE]

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

142

DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding  

Broader source: Energy.gov (indexed) [DOE]

DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding March 30, 2010 - 9:57am Addthis The U.S. Department of Energy yesterday filed with the Nuclear Regulatory Commission a response to Petitions to Intervene filed by several parties seeking to oppose the Department's motion to withdraw its license application for a nuclear waste repository at Yucca Mountain. DOE said it is confident that its motion to withdraw the application is lawful, but that it believes the petitioning parties should be allowed to present their views to the NRC. It thus did not oppose the motions to intervene, and proposed a schedule for resolving the dispute over the Department's motion to withdraw the application. The parties seeking to intervene are

143

Engineering Aspects of Heat Transfer in Multilayer Reflective Insulation and Performance of NRC Insulation  

Science Journals Connector (OSTI)

All types of high-performance insulation, often referred to as “superinsulation,” ... Carbide Corporation in October, 1958, or the insulation proposed and tested in 1951 by P. ... D. Little, Inc., or the NRC insulation

M. P. Hnilicka

1960-01-01T23:59:59.000Z

144

Status of NRC approval of EPRI electromagnetic interference susceptibility testing guidelines for digital equipment  

SciTech Connect (OSTI)

Historically, nuclear power plants installing digital equipment have been required to conduct expensive, site-specific electromagnetic interference (EMI) surveys to demonstrate that EMI will not affect the operation of sensitive electronic equipment. Consequently, EPRI formed a Utility Working Group which developed a set of generic EMI susceptibility testing guidelines, which were published as an EPRI report in September 1994. These guidelines are based upon EMI survey data obtained from several different plants and include criteria for determining their applicability. The Working Group interacted with NRC staff to obtain NRC approval. In April 1996, the NRC issued a Safety Evaluation Report (SER) endorsing the guidelines as a valid means of demonstrating EMI compatibility. The issuance of this SER was conditional on issuing a revision to the EPRI EMI Guidelines. This paper summarizes the guidelines, the NRC SER, and the current status of Revision 1 to the report.

James, R.W. [Electric Power Research Institute, Palo Alto, CA (United States); Shank, J.W. [Public Service Electric & Gas Company, Hancock`s Bridge, NJ (United States); Yoder, C. [Baltimore Gas & Electric, Lusby, MD (United States)

1996-12-31T23:59:59.000Z

145

Flooding of an underground facility at Yucca Mountain: A summary of NRC review plans  

SciTech Connect (OSTI)

Staff of the U.S. Nuclear Regulatory Commission (NRC) are developing review plans for a potential high-level waste (HLW) repository at Yucca Mountain, Nevada. This early preparation of NRC`s review program will ensure that important technical issues related to compliance with 10 CFR Part 60 will be identified before receipt of a license application. Under the siting criteria of NRC`s Part 60, one of the potentially adverse conditions is the potential for flooding of the underground facility by surface waters. The Department of Energy (DOE) should evaluate this and other conditions in a license application. This paper summarizes the NRC staff`s plans to review DOE`s demonstration of compliance with Part 60 regarding potential flooding of an underground facility. We present these plans recognizing that the Congress is currently considering changes in how a HLW repository would be licensed.

Coleman, N.M.; Wescott, R.G.; Johnson, T.L. [Nuclear Regulatory Commission, Washington, DC (United States)

1996-12-01T23:59:59.000Z

146

Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE...  

National Nuclear Security Administration (NNSA)

Len Myers Special Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Reasons to Call NMMSS -...

147

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Broader source: Energy.gov (indexed) [DOE]

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

148

Evidence-Based Background Material Underlying Guidance for Federal...  

Broader source: Energy.gov (indexed) [DOE]

Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Evidence-Based Background Material Underlying Guidance for...

149

O&M Metering Guidance  

Broader source: Energy.gov (indexed) [DOE]

O&M and Metering Guidance O&M and Metering Guidance Ab Ream Ab.ream@ee.doe.gov Federal Utility Partnership Working Group October 2010, Rapid City SD 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov O&M and Metering Guidance FEMP Mission Statement "The Federal Energy Management Program facilitates the Federal government's implementation of sound, cost- effective energy management practices to enhance the nation's energy security and environmental stewardship" 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov O&M and Metering Guidance O&M Best Practice Guidance Release 3.0 - August 2010 General Updates Include:

150

Federal Renewable Energy Guidance to EPACT 2005  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Renewable Energy Guidance to EPACT 2005 David McAndrew FUPWG Sandestin Requirement Guidance Overview The guidance outlines the following: - Authority - Requirement - Definition of the renewable energy technologies & products - Requirements for qualifying renewable energy projects or purchases - How agencies renewable energy purchase toward energy reduction requirements will gradually phase out Authority The authority for this guidance is based on Section 203, FEDERAL PURCHASE REQUIREMENT of the Energy Policy Act of 2005 (42 U.S.C. 15852) and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management (72 FR 3919; January 24, 2007), and the instructions and guidance distributed by the Chairman of the Council for Environmental

151

DOE Guidance-Category Rating  

Broader source: Energy.gov (indexed) [DOE]

2010 2010 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SARA"iJ. Boku1, DIRECToR OF HUMAN C~TAL MANAGEMENT SUBJECT: GUIDANCE MEMORANDUM #10 CATEGORY RATING The purpose of this memorandum is to establish the Department of Energy's (DOE's) policy for the use of Category Rating. Authorities: Public Law 107-296; Title 5 USC 3319; 5 CFR, Part 337, Subpart C., Presidential Memorandum of May 11, 2010 This guidance is established in accordance with 5 USC 3319, which authorizes Federal Agencies to use alternative rating proced.ures in assessing applicants for employment using category rating and selection procedures, and to ensure consistency in complying with federal regulations contained in the Code of Federal Regulations (CFR), Office of Personnel Management (OPM) and the Department of

152

Building Energy Use Benchmarking Guidance  

Broader source: Energy.gov (indexed) [DOE]

Building Energy Use Benchmarking Guidance April 15, 2010 EISA SECTION 432 - Benchmarking of Federal Facilities (42 U.S.C. 8253 Subsection (f), Use of Energy and Water Efficiency Measures in Federal Buildings) I. Background A. Authority - Benchmarking Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA) requires the Secretary of the United States Department of Energy (DOE) to select or develop a building energy use benchmarking system and to issue guidance for use of the system. EISA requires the designated agency energy managers to enter energy use data for each metered building that is (or is a part of) a covered facility into a building energy use benchmarking system, such as the ENERGY STAR Portfolio Manager tool (Portfolio Manager) (see 42 U.S.C. 8253(f)(8)(A), as

153

Review of soil contamination guidance  

SciTech Connect (OSTI)

A review of existing and proposed radioactive soil contamination standards and guidance was conducted for United Nuclear Corporation (UNC), Office of Surplus Facilities Management. Information was obtained from both government agencies and other sources during a literature survey. The more applicable standards were reviewed, evaluated, and summarized. Information pertaining to soil contamination for both facility operation and facility decommissioning was obtained from a variety of sources. These sources included: the Code of Federal Regulations, regulatory guides, the Federal Register, topical reports written by various government agencies, topical reports written by national laboratories, and publications from the American National Standards Institute (ANSI). It was difficult to directly compare the standards and guidance obtained from these sources since each was intended for a specific situation and different units or bases were used. However, most of the information reviewed was consistent with the philosophy of maintaining exposures at levels as low as reasonably achievable (ALARA).

Mueller, M.A.; Kennedy, W.E. Jr.; Soldat, J.K.

1981-08-01T23:59:59.000Z

154

Microsoft Word - Interpretive Guidance FINAL  

Broader source: Energy.gov (indexed) [DOE]

June 2, 2011 June 2, 2011 INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 This guidance is intended to clarify the Department of Energy (DOE)'s interpretation of 10 C.F.R. § 205.322, which sets forth the contents of an application for a Presidential permit issued by DOE under Executive Order (E.O.) 10485, as amended by E.O. 12038. Anyone seeking to construct, operate, maintain, or connect an electric transmission facility crossing the borders of the United States must first obtain a Presidential permit. Section 205.322 requires that an application for a Presidential permit provide, among other things: a) "Information regarding the applicant" (e.g., name, contact information, foreign government ownership or contractual relationships);

155

Guidance, Reports, and Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sites » Guidance, Reports, and Documents Sites » Guidance, Reports, and Documents Guidance, Reports, and Documents The following are annual reports, guidance documents, and regulatory drivers for long-term surveillance and maintenance activities. Guidance and Reports Guidance for Developing and Implementing Long-Term Surveillance Plans for UMTRCA Title I and Title II Disposal Sites Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance Title I Disposal Sites Annual Report Title II Disposal Sites Annual Report Site Transition Framework Information and Records Management Transition Guidance Long-Term Surveillance and Maintenance Program 2003 Report Record of Decision for Ground Water

156

Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

53 53 Guide for Performing Screening Ecological Risk Assessments at DOE Facilities This report has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; prices available from 615-576-8401 (fax 615-576-2865). Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161. ES/ER/TM-153 Guide for Performing Screening Ecological Risk Assessments at DOE Facilities G. W. Suter II Date Issued-September 1995 Prepared by the Environmental Restoration Risk Assessment Program, Prepared for the U.S. Department of Energy Office of Environmental Management under budget and reporting code EW 20

157

Qubit state guidance without feedback  

E-Print Network [OSTI]

We study a protocol for two-qubit state guidance that does not rely on feedback mechanisms. In our scheme, entanglement can be concentrated by arranging the interactions of the qubits with a continuous variable ancilla. By properly post-selecting the outcomes of repeated measurements of the state of the ancilla, the qubit state is driven to have a desired amount of purity and entanglement. We stress the primary role played by the first iterations of the protocol. Inefficiencies in the detection operations can be fully taken into account.

Mauro Paternostro; M. S. Kim

2004-10-04T23:59:59.000Z

158

Acquisition Plan Strategy and Guidance  

Broader source: Energy.gov (indexed) [DOE]

3 3 01 ACQUISITION PLAN STRATEGY AND GUIDANCE NOTE: The process provided below is not intended to replace an agency's acquisition planning requirements. INSTRUCTIONS 1. Work with your DOE Federal Finance Specialist to determine whether a "pay from savings" project is feasible. a. Determine if appropriated dollars are available to offset some of the costs. b. Consider alternative finance options: Energy Savings Performance Contract (ESPC), Utility Energy Service Contract (UESC), Power Purchase Agreement (PPA), or Enhanced Use Lease (EUL) Scott Wolf 6848 Cooper Point Road NW Olympia, WA 98502 Phone: 360-866-9163 Fax: 360-866-9683 scott.wolf@ee.doe.gov Serving Montana, Wyoming, Utah, Colorado, Nebraska, New Mexico,

159

Appliances and Commercial Equipment Standards: Guidance  

Broader source: Energy.gov (indexed) [DOE]

Office Office HOME ABOUT ENERGY EFFICIENT TECHNOLOGIES RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS APPLIANCE & EQUIPMENT STANDARDS BUILDING ENERGY CODES EERE » Building Technologies Office » Appliances & Equipment Standards About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Guidance and Frequently Asked Questions This webpage is designed to provide guidance and answer Frequently Asked Questions (FAQs) on the U.S. Department of Energy's appliance standards program. Guidance types span all covered products and covered equipment and cover such topics as: definitions, scope of coverage, conservation standards, test procedures, certification, Compliance and Certification Management System (CCMS), and enforcement. This website offers users an

160

POLICY GUIDANCE MEMORANDUM #31 - Procedures for Regularizing...  

Broader source: Energy.gov (indexed) [DOE]

1 - Procedures for Regularizing Illegal Appointments POLICY GUIDANCE MEMORANDUM 31 - Procedures for Regularizing Illegal Appointments As part of the Department's ongoing effort to...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Energy Sector Cybersecurity Framework Implementation Guidance...  

Broader source: Energy.gov (indexed) [DOE]

Cybersecurity Framework Implementation Guidance - Notice of Public Comment: Federal Register Notice, Volume 79, No. 177, September 12, 2014 Energy Sector Cybersecurity Framework...

162

POLICY GUIDANCE MEMORANDUM #25 Functional Accountability | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

5 Functional Accountability POLICY GUIDANCE MEMORANDUM 25 Functional Accountability Policy Statement reiterating that the Human Resources Directors (HRDs) are accountable to the...

163

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers [EERE]

JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector...

164

Security and Cyber Guidance | Department of Energy  

Office of Environmental Management (EM)

April 2008 Cyber Security Evaluations Appraisal Process Guide - April 2008 Performance Testing Guidance & Information Composite Adversary Team Brochure - April 9, 2008...

165

Departmental Personnel Security - Implementation Guidance | Department...  

Office of Environmental Management (EM)

Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing Implementation Guidance December 3, 2007 Template for Contractor Company Template for...

166

Council on Environmental Quality - Guidance for Environmental...  

Open Energy Info (EERE)

Guidance for Environmental Assessments of Forest Health Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality -...

167

Energy Intensity Baselining and Tracking Guidance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Learn more at betterbuildings.energy.gov Energy Intensity Baselining and Tracking Guidance i Preface The U.S. Department of Energy's (DOE) Better Buildings, Better Plants Program...

168

POLICY GUIDANCE MEMORANDUM #24 Reemployed Annuitant Benefits...  

Office of Environmental Management (EM)

GUIDANCE MEMORANDUM 24 Reemployed Annuitant Benefits Responsible Contacts Lynette Johnson HUMAN RESOURCES SPECIALIST (EMPLOYEE BENEFITS) E-mail lynette.johnson@hq.doe.gov...

169

Site Transition Guidance | Department of Energy  

Office of Environmental Management (EM)

Transition Guidance More Documents & Publications EM Recovery Act Lessons Learned (Johnson) Info-Exch 2012 - Thomas Johnson Presentation EM Recovery Act Lessons Learned...

170

Energy Sector Cybersecurity Framework Implementation Guidance...  

Energy Savers [EERE]

and government. In developing this guidance, the Energy Department collaborated with private sector stakeholders through the Electricity Subsector Coordinating Council and the...

171

Participatory Carbon Monitoring: Operational Guidance for National...  

Open Energy Info (EERE)

Participatory Carbon Monitoring: Operational Guidance for National REDD+ Carbon Accounting Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Participatory Carbon...

172

Commercial Grade Dedication Guidance | Department of Energy  

Office of Environmental Management (EM)

was not manufactured, developed, or performed under a qualified American Society of Mechanical Engineers (ASME) NQA-1 Quality Assurance program. This Guide also provides guidance...

173

Enforcement Guidance Supplement (EGS) 00-04  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS: 00-04 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 23, 2000 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C DOE' s Operational Procedures for Enforcement (June 1998), which supercede the DOE Enforcement Handbook (1087-95), provides the Office of Enforcement and Investigation with the opportunity to issue interim enforcement guidance from time to time with

174

International Conference on Machine Control & Guidance 2008 1 Automatic Guidance of Track Laying Machines with  

E-Print Network [OSTI]

1st International Conference on Machine Control & Guidance 2008 1 Automatic Guidance of Track Laying Machines with Respect to Coordinate Systems Th. ENGEL*, JJ. STUBY, Ch. GLAUSER, P. GÃ?LDENAPFEL machine guidance, this text focuses on presenting and solving three challenges without which coordinate

175

Proposed Outline for DOE-LM / NRC Working Group Meeting  

Office of Legacy Management (LM)

Agenda Agenda Monticello Mill Tailings Site (MMTS) Operable Unit III Biomonitoring Scope and Status Future Scope of Groundwater Treatment June 27, 2011 (8 a.m. - 1 p.m.) U.S. Environmental Protection Agency, Region 8, Denver, CO 8:00 a.m. Introduction Objectives and Expected Outcomes: 1. Concur Upon Future Scope of Biomonitoring Program 2. Concur Upon Satisfied OU III Technical Impracticability (TI) Requirements and Identify Data Needs Biomonitoring Scope & Status 8:15 a.m. MMTS Biomonitoring: March 2011 Report Summary and Presentation* 8:45 a.m. Group Discussion Objectives: Review findings: Ensure common understanding of historical & ecological context

176

Minutes from 12 December 2006 DOE/NRC Video Teleconference Call on Section 3116 Implementation Activities  

Broader source: Energy.gov (indexed) [DOE]

12 December 2006 DOE/NRC Video Teleconference Call on Section 3116 12 December 2006 DOE/NRC Video Teleconference Call on Section 3116 Implementation Activities Attendees: Representatives from DOE-Savannah River (DOE-SR), DOE-Headquarters (DOE-HQ), and the U.S. Nuclear Regulatory Commission (NRC) participated in a video teleconference call from 2:00 - 4:00 on 14 December 2006. A conference phone line was planned for other DOE field office participation (Idaho, West Valley, Office of River Protection), U.S. Environmental Protection Agency, Region IV (EPA-IV), and South Carolina Department of Health and Environmental Control (SCDHEC). However, technical difficulties prevented participation from all except SCDHEC. Discussion: The participants discussed prioritization of generic and specific technical issues to be resolved and a potential schedule for future meetings to discuss resolution

177

Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

178

Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

1995-10-01T23:59:59.000Z

179

Guidance for performing preliminary assessments under CERCLA  

SciTech Connect (OSTI)

EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

NONE

1991-09-01T23:59:59.000Z

180

Data Protection Act 1998 Guidance for  

E-Print Network [OSTI]

Data Protection Act 1998 ­ Guidance for Staff/Students v1.0 v1.0 June 2012 Elaine Forbes, registered in Scotland, number SC015263 #12;Data Protection Act 1998 ­ Guidance for Staff/Students v1.0 Page .................................................................................................... 2 2. Personal Data in the University

Mottram, Nigel

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Critical Update - Renwable Guidance Update  

Broader source: Energy.gov (indexed) [DOE]

Renewable Update Renewable Update FUPWG May 1, 2007 Chandra Shah, National Renewable Energy Laboratory 303-384-7557, chandra_shah@nrel.gov Presentation Overview * Energy Policy Act of 2005 (EPACT 05) Federal Renewable Goal * Executive Order 13423 & Instructions * EPACT/EO Renewable Goal Guidance * Federal Renewable Use Update * Innovative Renewable Projects 3  Section 203 (a) Requirement- The President, acting through the Secretary, shall seek to ensure that, to the extent economically feasible and technically practicable, of the total amount of electric energy the Federal Government consumes during any fiscal year, the following amounts shall be renewable energy:  (1) Not less than 3% in FY07-09  (2) Not less than 5% in FY10-FY12  (3) Not less than 7.5% in FY13 & each fiscal year thereafter.

182

Federal Energy Management Program: Energy Management Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal laws and regulations related to energy management. General Guidance for Facilities Overview of Federal Energy Management Policy and Mandates: Guidance document outlining Federal energy management goals and requirements for Federal energy managers. Sustainability Requirement Crosswalk: Crosswalk of sustainability and energy goals and targets within executive orders and other statutes. Guidelines Establishing Criteria for Excluding Buildings from the Energy Performance Requirements of Section 543 of the National Energy Conservation Policy Act as Amended by the Energy Policy Act of 2005 (EPAct 2005): Guidelines that established criteria for exclusions from the energy performance requirement for a fiscal year or any Federal building or collection of Federal buildings within the statutory framework provided by the law.

183

Technical Standards, ALOHA-Code Guidance - June 22, 2004 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Guidance - June 22, 2004 June 22, 2004 DOE-EH-4.2.1.4-ALOHA-Code Guidance, ALOHA Computer Code Application Guidance for Documented Safety Analysis This document provides...

184

The development of regulatory expectations for computer-based safety systems for the UK nuclear programme  

SciTech Connect (OSTI)

The Nuclear Installations Inspectorate (NII) of the UK's Health and Safety Executive (HSE) has completed a review of their Safety Assessment Principles (SAPs) for Nuclear Installations recently. During the period of the SAPs review in 2004-2005 the designers of future UK naval reactor plant were optioneering the control and protection systems that might be implemented. Because there was insufficient regulatory guidance available in the naval sector to support this activity the Defence Nuclear Safety Regulator (DNSR) invited the NII to collaborate with the production of a guidance document that provides clarity of regulatory expectations for the production of safety cases for computer based safety systems. A key part of producing regulatory expectations was identifying the relevant extant standards and sector guidance that reflect good practice. The three principal sources of such good practice were: IAEA Safety Guide NS-G-1.1 (Software for Computer Based Systems Important to Safety in Nuclear Power Plants), European Commission consensus document (Common Position of European Nuclear Regulators for the Licensing of Safety Critical Software for Nuclear Reactors) and IEC nuclear sector standards such as IEC60880. A common understanding has been achieved between the NII and DNSR and regulatory guidance developed which will be used by both NII and DNSR in the assessment of computer-based safety systems and in the further development of more detailed joint technical assessment guidance for both regulatory organisations. (authors)

Hughes, P. J. [HM Nuclear Installations Inspectorate Marine Engineering Submarines Defence Nuclear Safety Regulator Serco Assurance Redgrave Court, Merton Road, Bootle L20 7HS (United Kingdom); Westwood, R.N; Mark, R. T. [FLEET HQ, Leach Building, Whale Island, Portsmouth, PO2 8BY (United Kingdom); Tapping, K. [Serco Assurance,Thomson House, Risley, Warrington, WA3 6GA (United Kingdom)

2006-07-01T23:59:59.000Z

185

NRC staff site characterization analysis of the Department of Energy`s Site Characterization Plan, Yucca Mountain Site, Nevada  

SciTech Connect (OSTI)

This Site Characterization Analysis (SCA) documents the NRC staff`s concerns resulting from its review of the US Department of Energy`s (DOE`s) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation`s first geologic repository for high-level radioactive waste. DOE`s SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC`s specific objections related to the SCP, and major comments and recommendations on the various parts of DOE`s program, are presented in SCA Section 2, Director`s Comments and Recommendations. Section 3 contains summaries of the NRC staff`s concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE`s program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC`s responsibilities with respect to DOE`s SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs.

NONE

1989-08-01T23:59:59.000Z

186

Final report of the NRC-Agreement State Working Group to evaluate control and accountability of licensed devices  

SciTech Connect (OSTI)

US NRC staff acknowledged that licensees were having problems maintaining control over and accountability for devices containing radioactive material. In June 1995, NRC approved the staff`s suggestion to form a joint NRC-Agreement State Working Group to evaluate the problem and propose solutions. The staff indicated that the Working Group was necessary to address the concerns from a national perspective, allow for a broad level of Agreement State input, and to reflect their experience. Agreement State participation in the process was essential since some Agreement States have implemented effective programs for oversight of device users. This report includes the 5 recommendations proposed by the Working Group to increase regulatory oversight, increase control and accountability of devices, ensure proper disposal, and ensure disposal of orphaned devices. Specifically, the Working Group recommends that: (1) NRC and Agreement States increase regulatory oversight for users of certain devices; (2) NRC and Agreement State impose penalties on persons losing devices; (3) NRC and Agreement States ensure proper disposal of orphaned devices; (4) NRC encourage States to implement similar oversight programs for users of Naturally-Occurring or Accelerator- Produced Material; and (5) NRC encourage non-licensed stakeholders to take appropriate actions, such as instituting programs for material identification.

NONE

1996-10-01T23:59:59.000Z

187

NRC TLD Direct Radiation Monitoring Network progress report, October--December 1994. Volume 14, No. 4  

SciTech Connect (OSTI)

This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1994. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

Struckmeyer, R.

1995-03-01T23:59:59.000Z

188

NRC TLD Direct Radiation Monitoring Network. Progress report, October--December 1996  

SciTech Connect (OSTI)

This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1996. It provides the ambient radiation levels measured in the vicinity of 74 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program. 3 figs., 4 tabs.

Struckmeyer, R.

1997-03-01T23:59:59.000Z

189

NRC Earth Science Decadal Survey-Mission Concept Earth Sciences from the Astronomer's Perspective, a Deep  

E-Print Network [OSTI]

NRC Earth Science Decadal Survey-Mission Concept Earth Sciences from the Astronomer's Perspective Irina Melnikova #12;1 Earth Sciences from the Astronomer's Perspective 1.0 Mission Concept and Purpose Earth observations from satellites located in deep space offer the exciting opportunity to look

Christian, Eric

190

Types of Cost in Inductive Concept Learning Peter Turney PETER.TURNEY@NRC.CA  

E-Print Network [OSTI]

Types of Cost in Inductive Concept Learning Peter Turney PETER.TURNEY@NRC.CA Institute of classes. In real-world applications of concept learning, there are many different types of cost involved. The majority of the machine learning literature ignores all types of cost (unless accuracy is interpreted

Weiss, Gary

191

Alternative Fuels Data Center: State Vehicle Purchasing Guidance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Vehicle Purchasing Guidance to someone by E-mail Share Alternative Fuels Data Center: State Vehicle Purchasing Guidance on Facebook Tweet about Alternative Fuels Data Center: State Vehicle Purchasing Guidance on Twitter Bookmark Alternative Fuels Data Center: State Vehicle Purchasing Guidance on Google Bookmark Alternative Fuels Data Center: State Vehicle Purchasing Guidance on Delicious Rank Alternative Fuels Data Center: State Vehicle Purchasing Guidance on Digg Find More places to share Alternative Fuels Data Center: State Vehicle Purchasing Guidance on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type State Vehicle Purchasing Guidance The Washington Department of Enterprise Services must develop guidelines

192

Federal Energy Management Program: Greenhouse Gas Guidance and Reporting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Greenhouse Gas Greenhouse Gas Guidance and Reporting to someone by E-mail Share Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on Facebook Tweet about Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on Twitter Bookmark Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on Google Bookmark Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on Delicious Rank Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on Digg Find More places to share Federal Energy Management Program: Greenhouse Gas Guidance and Reporting on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases Basics Federal Requirements Guidance & Reporting

193

Critical Update - Renewable Guidance Update | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Critical Update - Renewable Guidance Update Critical Update - Renewable Guidance Update Presentation covers the FUPWG Meeting, held on May 1-2, 2007 in Cape Canaveral, Florida....

194

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program...  

Broader source: Energy.gov (indexed) [DOE]

This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01:...

195

POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated...  

Broader source: Energy.gov (indexed) [DOE]

3 - Requirements for DOE Delegated Examining Procedures POLICY GUIDANCE MEMORANDUM 33 - Requirements for DOE Delegated Examining Procedures The purpose of this guidance is to...

196

2014 Federal Real Property Council Reporting Guidance | Department...  

Office of Environmental Management (EM)

4 Federal Real Property Council Reporting Guidance 2014 Federal Real Property Council Reporting Guidance FY 2014 FRPP Data Dictionary Version 2 July 2014.pdf More Documents &...

197

Guidance for Energy Efficiency and Conservation Block Grant Recipients...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

17 EFFECTIVE DATE: July 21, 2010 SUBJECT: GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON PROGRAM EVALUATION GUIDELINES. PURPOSE To provide guidance to...

198

Guidance for Energy Efficiency and Conservation Block Grant Grantees...  

Energy Savers [EERE]

Financing Programs Guidance for Energy Efficiency and Conservation Block Grant Grantees on Financing Programs Provides general guidance to the U.S. Department of Energy's Energy...

199

GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS...  

Energy Savers [EERE]

GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON CLOSEOUT PROCEDURES FOR NON-STATE ENERGY OFFICE RECIPIENTS. GUIDANCE FOR ENERGY EFFICIENCY AND...

200

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Office of Environmental Management (EM)

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and...

202

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...  

Office of Environmental Management (EM)

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of...

203

Technical Standards, CFAST-Code Guidance - July 23, 2004 | Department...  

Broader source: Energy.gov (indexed) [DOE]

2004 Technical Standards, CFAST-Code Guidance - July 23, 2004 July 23, 2004 EPIcode Computer Code Application Guidance for Documented Safety Analysis The contents of this report...

204

Technical Standards, CFAST-Code Guidance- July 23, 2004  

Broader source: Energy.gov [DOE]

DOE-EH-4.2.1.4-CFAST-Code Guidance, CFAST Computer Code Application Guidance for Documented Safety Analysis

205

Nuclear Safety Policy, Guidance & Reports | Department of Energy  

Office of Environmental Management (EM)

Nuclear Safety Policy, Guidance & Reports Nuclear Safety Policy, Guidance & Reports The Office of Nuclear Safety establishes and maintains nuclear safety policy, requirements, and...

206

POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition...  

Broader source: Energy.gov (indexed) [DOE]

9A Direct Hire Authority for Acquisition Positions (Expired) POLICY GUIDANCE MEMORANDUM 09A Direct Hire Authority for Acquisition Positions (Expired) THIS GUIDANCE HAS EXPIRED...

207

POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4B Direct Hire Authority for Contract Specialist positions POLICY GUIDANCE MEMORANDUM 34B Direct Hire Authority for Contract Specialist positions Policy Guidance Memorandum 34B...

208

POLICY GUIDANCE MEMORANDUM #05 Accretion-of-Duties | Department...  

Broader source: Energy.gov (indexed) [DOE]

5 Accretion-of-Duties POLICY GUIDANCE MEMORANDUM 05 Accretion-of-Duties This memorandum provides policy guidance on how to consistently address accretion-of-duties promotions...

209

Memorandum Guidance for the Preparation of Department of Energy...  

Office of Environmental Management (EM)

Guidance for the Preparation of Department of Energy (DOE) Annual Site Environmental reports (ASERs) for Calendar Year 2013 Memorandum Guidance for the Preparation of Department of...

210

Guidance for Preparation of the 2013 Department of Energy Annual...  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Preparation of the 2013 Department of Energy Annual Site Environmental Reports Guidance for Preparation of the 2013 Department of Energy Annual Site Environmental...

211

State Energy Program Formula Grant Guidance Program Year 2007...  

Broader source: Energy.gov (indexed) [DOE]

Formula Grant Guidance Program Year 2007 State Energy Program Formula Grant Guidance Program Year 2007 This document provides instructions to the states for program year 2007 about...

212

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program This document contains the Final...

213

Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program...

214

Energy Department Seeks Additional Feedback on Draft Guidance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric...

215

POLICY GUIDANCE MEMORANDUM #38 EXCEPTION TO POLICY REGARDING...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

POLICY GUIDANCE MEMORANDUM 38 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES POLICY GUIDANCE MEMORANDUM 38 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES To issue a...

216

Federal Renewable Energy Guidance to EPACT 2005 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Renewable Energy Guidance to EPACT 2005 Federal Renewable Energy Guidance to EPACT 2005 Presentation covers the agency renewable energy requirements for EPACT 2005 given at...

217

POLICY GUIDANCE MEMORANDUM #14 Establishing a Residence for a...  

Energy Savers [EERE]

this issue. DOE guidance is as follows. This guidance will be incorporated in the DOE Handbook on Recruitment and Retention Incentives as an appendix during the next update....

218

Energy Department Issues Tribal Renewable Energy Purchase Guidance...  

Office of Environmental Management (EM)

Tribal Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources...

219

State Energy Program Fiscal Year 2006 Formula Grant Guidance  

Broader source: Energy.gov (indexed) [DOE]

STATE ENERGY PROGRAM NOTICE 06-1 EFFECTIVE DATE: January 6, 2006 SUBJECT: PROGRAM YEAR 2006 STATE ENERGY PROGRAM FORMULA GRANT GUIDANCE PURPOSE To establish grant guidance and...

220

State Energy Program Formula Grant Guidance Program Year 2007  

Broader source: Energy.gov (indexed) [DOE]

STATE ENERGY PROGRAM FORMULA GRANT GUIDANCE PROGRAM YEAR 2007 STATE ENERGY PROGRAM NOTICE 07-01 EFFECTIVE DATE: April 3, 2007 PURPOSE To establish grant guidance and management...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Policy and Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance Guidance Policy and Guidance Strategic directions are influenced by an analysis of budget and workforce projections and plans, congressional mandates, administration goals, Departmental priorities and mission needs. Human capital management strategies, policy, programs and plans are developed and assessed for overall success and compliance with merit system principals, civil service laws and regulations, and Departmental HCM directives. OCHCO is the primary representative body for the Department when coordinating with the Office of Personnel Management, the Office of Management and Budget, the General Accounting Office, and other Federal and non-Federal customers and organizations in connection with human resources and human capital management areas of responsibility.

222

POLICY GUIDANCE MEMORANDUM #23 Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes  

Broader source: Energy.gov [DOE]

Policy Guidance Memorandum #23 - DOE Guidance – Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes

223

Other NEPA Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Other NEPA Guidance Other NEPA Guidance Other NEPA Guidance Selected documents prepared by a variety of agencies that provide guidance on the NEPA process. December 31, 2009 Presidential Proclamation on the 40th Anniversary of the National Environmental Policy Act Proclamation of President Obama to "call upon all executive branch agencies to promote public involvement and transparency in their implementation of the National Environmental Policy Act." July 1, 1998 Managing NEPA at the Department of Energy A report, by the National Academy of Public Administration, on the management of NEPA within the Department of Energy. January 23, 1995 The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental

224

CAP Program Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CAP Program Guidance CAP Program Guidance CAP Program Guidance In 2002, the Department of Energy signed an interagency agreement with the Department of Defense's Computer/Electronic Accommodations Program (CAP) program to provide assistive/adaptive technology free of charge to DOE employees with disabilities. The following information regarding CAP is being provided to assist federal employees, managers and on- site disability coordinators with the CAP application process. CAP Program Guidance Responsible Contacts Suzanne Piper LEAD EMPLOYEE WORK LIFE SPECIALIST E-mail suzanne.piper@hq.doe.gov Phone 202-586-8515 More Documents & Publications DOE Reasonable Accommodation Procedures Rehabilitation Act of 1973 Operational Plan and Desktop Reference for the Disability Employment

225

CAP Program Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CAP Program Guidance CAP Program Guidance CAP Program Guidance In 2002, the Department of Energy signed an interagency agreement with the Department of Defense's Computer/Electronic Accommodations Program (CAP) program to provide assistive/adaptive technology free of charge to DOE employees with disabilities. The following information regarding CAP is being provided to assist federal employees, managers and on- site disability coordinators with the CAP application process. CAP Program Guidance Responsible Contacts Suzanne Piper LEAD EMPLOYEE WORK LIFE SPECIALIST E-mail suzanne.piper@hq.doe.gov Phone 202-586-8515 More Documents & Publications DOE Reasonable Accommodation Procedures Desk Reference on DOE-Flex Operational Plan and Desktop Reference for the Disability Employment

226

Water Efficiency Goal Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Efficiency Goal Guidance Water Efficiency Goal Guidance Water Efficiency Goal Guidance Water Efficiency Definitions A clear understanding of water efficiency definitions is very helpful in complying with the water-reduction goals of E.O. 13514. See section 3.0 of Federal Agency Implementation of Water Efficiency and Management Provisions of Executive Order 13514 for key definitions. The Council on Environmental Quality (CEQ) issued water efficiency goal guidance in Federal Agency Implementation of Water Efficiency and Management Provisions of Executive Order 13514. This comprehensive document establishes guidelines for Federal agencies in meeting the water-related requirements of Executive Order (E.O.) 13514 and includes information about baseline development, reporting requirements, and strategies for

227

General Guidance on NEPA | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Guidance on NEPA General Guidance on NEPA General Guidance on NEPA Selected documents providing General Guidance on NEPA. March 1, 2011 DOE, NEPA, and YOU A pamphlet providing information on public participation and NEPA. December 1, 2007 A Citizen's Guide to the NEPA: Having Your Voice Heard This guide is based on research and consultations undertaken by the Council on Environmental Quality concerning the need for a Citizen's Guide to the National Environmental Policy Act (NEPA). Participants in NEPA Regional Roundtables held in 2003-2004 clearly voiced the need for an guide that provides an explanation of NEPA, how it is implemented, and how people outside the Federal government - individual citizens, private sector applicants, members of organized groups, or representatives of Tribal,

228

POLICY GUIDANCE MEMORANDUM #26 Official Worksite Determinations  

Broader source: Energy.gov [DOE]

The following information is provided to assist in determinations of official worksites for remote workers. This guidance applies to Federal employees and employees hired under the Intergovernmental Personnel Act (IPA).

229

SECTION J, APPENDIX L - DIVERSITY PLAN GUIDANCE  

National Nuclear Security Administration (NNSA)

L, Page 1 SECTION J APPENDIX L Note: The Diversity Plan shall be submitted to the Contracting Officer in accordance with DEAR 970.5226-1 DIVERSITY PLAN GUIDANCE 12110 In...

230

Reflexive Expectation Formation Timo Ehrig  

E-Print Network [OSTI]

of expectations fold back to the realized economic process, and in particular, to the selection of one of multiple possible equilibria in the economic process? We present a game theoretical model in which these questions and the development of macroe- conomic quantities, when there is a fundamental uncertainty about the economic process

Jost, Jürgen

231

Building Technologies Office: Building America Climate-Specific Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

America America Climate-Specific Guidance to someone by E-mail Share Building Technologies Office: Building America Climate-Specific Guidance on Facebook Tweet about Building Technologies Office: Building America Climate-Specific Guidance on Twitter Bookmark Building Technologies Office: Building America Climate-Specific Guidance on Google Bookmark Building Technologies Office: Building America Climate-Specific Guidance on Delicious Rank Building Technologies Office: Building America Climate-Specific Guidance on Digg Find More places to share Building Technologies Office: Building America Climate-Specific Guidance on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education

232

Federal Energy Management Program: Water Efficiency Goal Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Goal Guidance to someone by E-mail Goal Guidance to someone by E-mail Share Federal Energy Management Program: Water Efficiency Goal Guidance on Facebook Tweet about Federal Energy Management Program: Water Efficiency Goal Guidance on Twitter Bookmark Federal Energy Management Program: Water Efficiency Goal Guidance on Google Bookmark Federal Energy Management Program: Water Efficiency Goal Guidance on Delicious Rank Federal Energy Management Program: Water Efficiency Goal Guidance on Digg Find More places to share Federal Energy Management Program: Water Efficiency Goal Guidance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases Water Efficiency Basics Federal Requirements Water Efficiency Goal Guidance Baseline & Annual Water Use Guidance Best Management Practices

233

International Conference on Machine Control & Guidance 2008 1 Guidance for Partial Face Excavation Machines  

E-Print Network [OSTI]

1st International Conference on Machine Control & Guidance 2008 1 Guidance for Partial Face Excavation Machines Nod CLARKE-HACKSTON, Jochen BELZ VMT GmbH Allan HENNEKER Surex Pty Ltd Abstract information to the machine operator, VMT GmbH has developed a system to support precise excavation

234

Guidance for identifying, reporting and tracking nuclear safety noncompliances  

SciTech Connect (OSTI)

This document provides Department of Energy (DOE) contractors, subcontractors and suppliers with guidance in the effective use of DOE`s Price-Anderson nuclear safety Noncompliance Tracking System (NTS). Prompt contractor identification, reporting to DOE, and correction of nuclear safety noncompliances provides DOE with a basis to exercise enforcement discretion to mitigate civil penalties, and suspend the issuance of Notices of Violation for certain violations. Use of this reporting methodology is elective by contractors; however, this methodology is intended to reflect DOE`s philosophy on effective identification and reporting of nuclear safety noncompliances. To the extent that these expectations are met for particular noncompliances, DOE intends to appropriately exercise its enforcement discretion in considering whether, and to what extent, to undertake enforcement action.

NONE

1995-12-01T23:59:59.000Z

235

NRC Recommendations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Analysis & Systems Integration For DOE Hydrogen R & D Messages from the Academies Hydrogen Study, Personal Experience Robert L. Hirsch Senior Energy Program Advisor, SAIC July 28, 2004 SAIC 2 Topics Academies findings / recommendations + Systems analysis & integration both needed Hydrogen's competition in the marketplace Hydrogen options varied / breakthroughs needed Academies study wide-ranging but limited Differences in systems analysis & system integration 3 ACADEMIES HYDROGEN STUDY COMPREHENSIVE CHALLENGING SUPPORTIVE OF DOE 4 ACADEMIES FINDINGS ACADEMIES FINDINGS Pathway to H 2 not straightforward Exploratory research is essential Extensive R&D needed Issues: Economic, social, & public acceptance, especially safety Hydrogen program management is far more

236

SQA Directives and Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SQA Directives and Guidance SQA Directives and Guidance SQA Directives and Guidance DOE O 414.1D, Quality Assurance DOE G 414.1-4, Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance DOE Order O 414.1D, Quality Assurance, includes Attachment 4 addressing SQA requirements for nuclear safety applications at DOE nuclear facilities. The DOE O 414.1D was issued April 25, 2011. This Order and its associated Guide for safety software, DOE G 414.1-4, Safety Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements. The Order identifies 10 software quality work activities that are to be performed using the graded approach specified in the Order. These 10 work activities are: (1) software project management, (2) software risk

237

Enforcement Guidance Supplement 99-02  

Broader source: Energy.gov (indexed) [DOE]

EGS 99-02 EGS 99-02 Appendix E - Operational Procedures for Enforcement July 16, 1999 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of

238

SGIG Reporting Guidance Archive | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SGIG Reporting SGIG Reporting Guidance Archive SGIG Reporting Guidance Archive July 22, 2010-- Federal Register Notice on the DOE's invitation for public comment on request to the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE has submitted to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before August 21, 2010. More> Public comments on OE's Emergency Information Collection Request Support Statement and draft Smart Grid Grant Program reporting guidance. OE's response to public comments on its Emergency Information Collection Request Support Statement and draft Smart Grid Grant Program reporting

239

Enforcement Guidance Supplement 00-03  

Broader source: Energy.gov (indexed) [DOE]

EGS:00-03 EGS:00-03 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 September 12, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH- Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in enforcement activities. This enforcement guidance focuses on several issues related to applicability of 10 CFR 830 that have been observed in

240

Policy and Guidance | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy and Guidance Policy and Guidance Policy and Guidance The Chief Information Officer (CIO) at the U.S. Department of Energy (DOE) has primary responsibility to ensure that Information Technology (IT) is acquired and information resources are managed in a manner consistent with statutory, regulatory, and Departmental requirements and priorities. With this responsibility, the CIO provides information resources management advice and assistance to the Secretary of Energy and to other senior managers. The CIO also coordinates and articulates a shared vision and corporate perspective among the Department's information activities, which permits the CIO to champion Departmental initiatives that effectively manage information and provide for value-added corporate systems. In addition to this internal focus, DOE recognizes the need to integrate

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS  

Broader source: Energy.gov (indexed) [DOE]

GUIDANCE GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of certain funds that can be spent on minor construction projects that are not specifically authorized by law. This Guidance is intended to clarify both the applicable law and Department policy. The Secretary's authority to carry out construction projects is subject to several limitations in the Atomic Energy Defense Act (AEDA) on the use of funds appropriated for DOE national security programs. One of these limitations, the "minor construction threshold," caps the amount of "operation and maintenance funds" or "facilities and "infrastructure funds authorized by a DOE

242

Diversity and Inclusion Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Diversity and Inclusion Guidance Diversity and Inclusion Guidance Diversity and Inclusion Guidance All DOE diversity and inclusion policies, practices and programs must comply with Federal Equal Employment Opportunity laws, Merit Systems Principles, the foundation of the Civil Service, and not constitute a Prohibited Personnel Practice. Federal Laws That Prohibit Workplace Discrimination The following laws are enforced by Equal Employment Opportunity Commission (EEOC): The VII of the Civil Rights Act of 1964 (Title VII), which makes it illegal to discriminate against a person on the basis of race, color, religion, sex, or national origin. The law also protects individuals from retaliation if they complain about discrimination or participate in the EEO process. http://www.eeoc.gov./laws/statutes/titlevii.cfm

243

Guidance for Planning Exercises | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Planning Exercises Guidance for Planning Exercises Guidance for Planning Exercises This guidebook and accompanying support materials presented in this manual was developed to assist local, state, tribal and federal agencies in conducting emergency preparedness tabletops, drills and exercises for transportation emergencies. It provides basic instructions on all aspects of event preparation, and describes how to use the other materials in this transportation emergency preparedness package. Used properly, this manual should enhance emergency preparedness by enabling communities to practice and demonstrate their ability to respond to a transportation emergency. The accident scenarios provided with this manual may be expanded/contracted to demonstrate some or all aspects of a response by one or more agencies.

244

Expected dose for the early failure scenario classes in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the determination of expected dose to the reasonably maximally exposed individual (RMEI) specified in the NRC regulations for the YM repository for the early waste package (WP) failure scenario class and the early drip shield (DS) failure scenario class in the 2008 YM PA. The following topics are addressed: (i) properties of the early failure scenario classes and the determination of dose and expected dose the RMEI, (ii) expected dose and uncertainty in expected dose to the RMEI from the early WP failure scenario class, (iii) expected dose and uncertainty in expected dose to the RMEI from the early DS failure scenario class, (iv) expected dose and uncertainty in expected dose to the RMEI from the combined early WP and early DS failure scenario class with and without the inclusion of failures resulting from nominal processes, and (v) uncertainty in the occurrence of early failure scenario classes. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

J.C. Helton; C.W. Hansen; C.J. Sallaberry

2014-01-01T23:59:59.000Z

245

Expected dose for the igneous scenario classes in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the determination of expected dose to the reasonably maximally exposed individual (RMEI) specified in the NRC regulations for the YM repository for the igneous intrusive scenario class and the igneous eruptive scenario class in the 2008 YM PA. The following topics are addressed: (i) properties of the igneous scenario classes and the determination of dose and expected dose to the RMEI, (ii) expected dose and uncertainty in expected dose to the RMEI from the igneous intrusive scenario class, (iii) expected dose and uncertainty in expected dose to the RMEI from the igneous eruptive scenario class, (iv) expected dose and uncertainty in expected dose to the RMEI from the combined igneous intrusive and igneous eruptive scenario class, and (v) uncertainty in the occurrence of igneous scenario classes. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

C.J. Sallaberry; C.W. Hansen; J.C. Helton

2014-01-01T23:59:59.000Z

246

NEPA Contracting Reform Guidance (December 1996)  

Broader source: Energy.gov (indexed) [DOE]

defining early what contractors should accomplish defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . .

247

Safety and Emergency Management Evaluations - Guidance Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance Documents Guidance Documents Safety and Emergency Management Evaluations Office Protocols Office of Safety and Emergency Management Evaluations Protocol for the Development and Maintenance of Criteria and Review Approach Documents, July 2013 Office of Safety and Emergency Management Evaluations Protocol for High Hazard Nuclear Facility Project Oversight, November 2012 Office of Safety and Emergency Management Evaluations Protocol for Required Reading, June 2012 Office of Safety and Emergency Management Evaluations Protocol for Small Team Oversight Activities, June 2012 (Rev. 1) Office of Safety and Emergency Management Evaluations Qualification Standard for the Site Lead Program, May 2011 Office of Safety and Emergency Management Evaluations Protocol for Site Leads, May 2011

248

Mercury Spill Information and Response Guidance  

E-Print Network [OSTI]

Mercury Spill Information and Response Guidance Background Information Mercury can be found, plumbing traps and vacuum pumps. When mercury is spilled, it forms beads or droplets that can accumulate mercury vapors can be very dangerous, depending on the amount inhaled and the length of exposure

Holland, Jeffrey

249

Energy Intensity Baselining and Tracking Guidance  

Broader source: Energy.gov [DOE]

The Energy Intensity Baselining and Tracking Guidance for the Better Buildings, Better Plants Program helps companies meet the program’s reporting requirements by describing the steps necessary to develop an energy consumption and energy intensity baseline and calculating consumption and intensity changes over time.

250

Green Impact Universities and Colleges: EXCELLENCE guidance  

E-Print Network [OSTI]

Green Impact Universities and Colleges: EXCELLENCE guidance 1.0 Introduction Green Impact progressing through institutionally bespoke workbooks to green their departments and campuses, the need, rather than reaching a pre-set endpoint, so we are developing Green Impact to ensure our participants

Harman, Neal.A.

251

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities.This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

252

Smart Grid Grant Program Recipient Reporting Guidance, Updated | Department  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Grant Program Recipient Reporting Guidance, Updated Smart Grid Grant Program Recipient Reporting Guidance, Updated Smart Grid Grant Program Recipient Reporting Guidance, Updated Reporting guidance for the Smart Grid Investment Grant project under the American Recovery and Reinvestment Act. Approved by the Office of Management and Budget (OMB). Includes guidance on DOE corporate reporting, Project Management Value System (PVMS) reporting, risk management reporting, milestone reporting, and DOE jobs reporting guidance. Smart Grid Grant Program Recipient Reporting Guidance, Updated More Documents & Publications Smart Grid Grant Program Recipient Reporting Guidance Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants Comments regarding U.S. Department of Energy Proposed Agency Information

253

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

254

Smart Grid Grant Program Recipient Reporting Guidance | Department of  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Grant Program Recipient Reporting Guidance Smart Grid Grant Program Recipient Reporting Guidance Smart Grid Grant Program Recipient Reporting Guidance Draft reporting guidance for the Smart Grid Investment Grant project under the American Recovery and Reinvestment Act. Submitted to Office of Management and Budget (OMB) for approval and subject to revision. Includes guidance on DOE corporate reporting, Project Management Value System (PVMS) reporting, risk management reporting, and DOE jobs reporting guidance. Smart Grid Grant Program Recipient Reporting Guidance More Documents & Publications Smart Grid Grant Program Recipient Reporting Guidance, Updated Questions and Answers for the Smart Grid Investment Grant Program: Reporting of Jobs Created/Retained in SIPRIS Questions and Answers for the Smart Grid Investment Grant Program:

255

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

256

Additional Requirements and Guidance for Digital Data Management...  

Office of Science (SC) Website

A A A FeedbackShare Page The following requirements and guidance provided by the Basic Energy Sciences (BES) program supplement but do not replace the requirements and guidance...

257

Final For-Profit Audit Guidance (FY 2011 and Following)  

Broader source: Energy.gov [DOE]

NOTE THE ATTACHED IS THE MOST RECENT GUIDANCE AND APPLIES TO AUDITS FOR RECIPIENT’S FYS 2011, 2012 and 2013.  NEW GUIDANCE WILL BE ISSUED IN DECEMBER 2014 WHICH WILL APPLY TO AUDITS OF RECIPIENT’S...

258

Technical Standards, Guidance on MACCS2 Computer Code - June...  

Broader source: Energy.gov (indexed) [DOE]

Technical Standards, Guidance on MACCS2 Computer Code - June 30, 2004 Technical Standards, Guidance on MACCS2 Computer Code - June 30, 2004 June 30, 2004 MACCS2 Computer Code...

259

State Energy Program Fiscal Year 2006 Formula Grant Guidance...  

Broader source: Energy.gov (indexed) [DOE]

Fiscal Year 2006 Formula Grant Guidance State Energy Program Fiscal Year 2006 Formula Grant Guidance State Energy Program (SEP) Program Notice 06-1 Fiscal Year 2006 Formula Grant...

260

Grant Guidance to Administer the American Recovery and Reinvestment...  

Broader source: Energy.gov (indexed) [DOE]

Grant Guidance to Administer the American Recovery and Reinvestment Act of 2009 Funding Grant Guidance to Administer the American Recovery and Reinvestment Act of 2009 Funding U.S....

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

For-Profit Audit Guidance (FY 2010) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

For-Profit Audit Guidance (FY 2010) For-Profit Audit Guidance (FY 2010) Coverage of Independent Audits of For-Profit Firms Audits for For-Profit Firms FAQ Part I, General Audit...

262

Orbital rendezvous using an Augmented Lambert Guidance scheme  

E-Print Network [OSTI]

The development of an Augmented Lambert Guidance Algorithm that matches the position and velocity of an orbiting target spacecraft is presented in this thesis. The Augmented Lambert Guidance Algorithm manipulates the inputs ...

MacLellan, Sara Jean

2005-01-01T23:59:59.000Z

263

Army Corps of Engineers - Regulatory Guidance Letters | Open...  

Open Energy Info (EERE)

Guidance Letters Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Corps of Engineers - Regulatory Guidance Letters Abstract This webpage provides a...

264

Updated Guidance on Conference-Related Activities and Spending  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Updated guidance and requirements in this memorandum are the result of improved processes that have been developed.

2012-12-06T23:59:59.000Z

265

Using the NEPA Requirements and Guidance - Search Index  

Broader source: Energy.gov (indexed) [DOE]

the NEPA Requirements and Guidance - Search Index the NEPA Requirements and Guidance - Search Index Step 2: Entering a Search Term or Phrase 1. Locate the downloaded file, right click on it, select "Extract all", extract it to any location on your computer or USB drive. 2. Locate and Open the extracted folder "NEPA Requirements and Guidance - Search Index". 3. Locate and Open the .PDX file titled "Search - NEPA Requirements and Guidance" to open search form.

266

Use of a Machine Control & Guidance System Determination of Performance  

E-Print Network [OSTI]

1 Use of a Machine Control & Guidance System Determination of Performance Protection against. Dr. P. Rausch Why Machine Guidance? 1 Introduction Machine Guidance allows higher performance. Higher someone checking down below: 09.07.2008 3 ,,Machine control by shout and gesture". Planned Excavator Job

267

Expectations of Mentors and Mentees | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with mentor by accepting guidance objectively T Teaches: - professionalism - ethics - problem solving. - Trusts mentor's judgement - Tolerates constructive criticism O...

268

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Broader source: Energy.gov (indexed) [DOE]

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

269

Guidance on Inherently Governmental Functions | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance on Inherently Governmental Functions Guidance on Inherently Governmental Functions Guidance on Inherently Governmental Functions Federal law prohibits contractors from performing "inherently governmental functions." This guidance is designed to provide the basic rules applicable to the Department. Specifically, it: (1) identifies general principles for determining whether a function is inherently governmental; (2) lists functions that have been specifically identified as inherently governmental by one or more sources of Federal law, (3) notes the special considerations applicable to Federally Funded Research and Development Centers (FFRDCs); and (4) offers recommended practices when using contractors' services. Microsoft Word - GC Guidance on Inherently Governmental Functions _1-24-11_

270

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Broader source: Energy.gov (indexed) [DOE]

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

271

FTCP Assessment Guidance and Criteria | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FTCP Assessment Guidance and Criteria FTCP Assessment Guidance and Criteria FTCP Assessment Guidance and Criteria This document establishes the guidance and criteria for conducting internal and independent Federal Technical Capability Assessments within the Department. The requirements of this document are applicable to those organizations having safety responsibilities for defense nuclear facilities. This includes both headquarters and field organizations. Regardless of the type of assessment conducted, the objectives and criteria within this document are used as a basis for the assessment. Use of consistent objectives and criteria is necessary to establish baselines and to track and trend performance. FTCP Assessment Guidance and Criteria, 1998 More Documents & Publications Technical Qualification Program and FTCP Assessment CRADs

272

Guidance for Federal Departments and Agencies on Establishing, Applying,  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Federal Departments and Agencies on Establishing, Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act This guidance from the Council on Environmental Quality provides methods for substantiating categorical exclusions, clarifies the process for establishing categorical exclusions, outlines how agencies should engage the public when establishing and using categorical exclusions, describes how agencies can document the use of categorical exclusions, and recommends periodic agency review of existing categorical exclusions. Final Guidance for Federal Departments and Agencies on Establishing,

273

THE NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece  

Office of Legacy Management (LM)

NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece :: ~,: : ..,.... ..,:y... included in the agency' s Site Decommissioning Managem&t Pian (SDMP) in.1990. The ., ,.;' -,; ;.L..z,. sites are all radioactive materials handling facilities in various stages of decommission- ~' ... ,' . .-_.... ..,: ,,~ ..,. -c : -: ing; some of them are slill under active Nuclear Regulatory Commission licenses,~some .~. . . . . . ...i.~ ,;::,: ' :-&-:' . -1.: : ;: _ :: .,,. >.r"!.-<,z...;::.~ ? ~' .._ .' l...' -i:i -::;.. c : of them were under licenses that are now terminated, and some were never licensed~, ,~: ,.~. ~~.. .,_. .i ' . In the Action Plan, which was published in the April 16 Federal Register, the NRC says' ;; *_: ._.:, :-.~:i:r~'

274

Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

275

Review of nuclear power plant offsite power source reliability and related recommended changes to the NRC rules and regulations  

SciTech Connect (OSTI)

The NRC has stated its concern about the reliability of the offsite power system as the preferred emergency source and about the possible damage to a pressurized water reactor (PWR) that could result from a rapid decay of power grid frequency. ORNL contracted with NRC to provide technical assistance to establish criteria that can be used to evaluate the offsite power system for the licensing of a nuclear power plant. The results of many of the studies for this contract are recommendations to assess and control the power grid during operation. This is because most of the NRC regulations pertaining to the offsite power system are related to the design of the power grid, and we believe that additional emphasis on monitoring the power grid operation will improve the reliability of the nuclear plant offsite power supply. 46 refs., 10 figs.

Battle, R.E.; Clark, F.H.; Reddoch, T.W.

1980-05-01T23:59:59.000Z

276

High Performance and Sustainable Buildings Guidance  

Broader source: Energy.gov (indexed) [DOE]

HIGH PERFORMANCE and SUSTAINABLE BUILDINGS GUIDANCE Final (12/1/08) PURPOSE The Interagency Sustainability Working Group (ISWG), as a subcommittee of the Steering Committee established by Executive Order (E.O.) 13423, initiated development of the following guidance to assist agencies in meeting the high performance and sustainable buildings goals of E.O. 13423, section 2(f). 1 E.O. 13423, sec. 2(f) states "In implementing the policy set forth in section 1 of this order, the head of each agency shall: ensure that (i) new construction and major renovations of agency buildings comply with the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings set forth in the Federal Leadership in High Performance and Sustainable Buildings Memorandum of Understanding (2006)

277

General Guidance on Data Usage and Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General Guidance on Data Usage and Management General Guidance on Data Usage and Management Summary Data Usage Credit Data Management and Documentation: Introduction Our philosophy Data management Record measured values Zero versus missing value Metadata Data documentation Define variables Specify units Provide citations For additional information Summary Ensure long-term preservation of, and full and open access to, high-quality data sets Give proper credit to the researchers providing the data Provide thorough, yet simple, documentation: how the data were produced, what they mean Generate ASCII data and documentation files; they ensure readibility by virtually all users Define variable names and units Point to, or provide, important publications that further document the data Data usage CDIAC fully supports the July 1991 Policy Statements on Data Management for

278

General Counsel's Office Issues Guidance on Inherently Governmental  

Broader source: Energy.gov (indexed) [DOE]

General Counsel's Office Issues Guidance on Inherently General Counsel's Office Issues Guidance on Inherently Governmental Functions General Counsel's Office Issues Guidance on Inherently Governmental Functions February 4, 2011 - 5:52pm Addthis Today, the Office of the General Counsel issued guidance on the federal prohibition against contractors performing inherently governmental functions. The guidance sets out the basic rules for what contactors can and cannot do and provides best practices for federal DOE employees when using contractor services. Since 2009, the General Counsel's office has made available on its websitenon-privileged legal guidance on topics ranging from contractor relations to standards of conduct to information law. Doing so helps to ensure that the Department's authoritative legal guidance is readily available to all who may need it

279

DOE NEPA Guidance and Requirements - Search Index - Table of Contents |  

Broader source: Energy.gov (indexed) [DOE]

DOE NEPA Guidance and Requirements - Search Index - Table of DOE NEPA Guidance and Requirements - Search Index - Table of Contents DOE NEPA Guidance and Requirements - Search Index - Table of Contents Return to Download Page The DOE NEPA Guidance and Requirements - Search Index includes: NEPA Guidance and Requirements Documents Issued by Published A Brief Guide - DOE-wide Contracts For NEPA Documentation DOE 2003 A Citizen's Guide to the NEPA - Having Your Voice Heard CEQ 2007 A Resource Handbook on DOE Transportation Risk Assessment DOE 2002 Actions During the NEPA Process - Interim Actions DOE 2003 Administrative Record Guidance DOJ 1991 Aligning the NEPA Process with EMS CEQ 2007 Alternative Actions For Analysis in Site-wide NEPA Reviews DOE 1992 Amended Environmental Impact Statement Filing System Guidance EPA 2012 Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA

280

CEQ Issues Guidance on Improving NEPA Process Efficiency | Department of  

Broader source: Energy.gov (indexed) [DOE]

CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency March 12, 2012 - 3:26pm Addthis The Council on Environmental Quality (CEQ) has issued new guidance titled "Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act" (NEPA Efficiency Guidance) that encourages federal agencies to "provide the best use of agency resources in ensuring a timely, effective, and efficient NEPA review." The NEPA Efficiency Guidance highlights existing provisions under the CEQ regulations implementing NEPA (40 CFR Parts 1500-1508) that help meet this objective. These provisions are available for the preparation of EAs, as well as EISs, and the Guidance encourages their use

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CEQ Issues Guidance on Improving NEPA Process Efficiency | Department of  

Broader source: Energy.gov (indexed) [DOE]

CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency March 12, 2012 - 3:26pm Addthis The Council on Environmental Quality (CEQ) has issued new guidance titled "Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act" (NEPA Efficiency Guidance) that encourages federal agencies to "provide the best use of agency resources in ensuring a timely, effective, and efficient NEPA review." The NEPA Efficiency Guidance highlights existing provisions under the CEQ regulations implementing NEPA (40 CFR Parts 1500-1508) that help meet this objective. These provisions are available for the preparation of EAs, as well as EISs, and the Guidance encourages their use

282

FRPC User Guidance -for FY2006  

Broader source: Energy.gov (indexed) [DOE]

09 GUIDANCE FOR 09 GUIDANCE FOR REAL PROPERTY INVENTORY REPORTING I S S U E D A T E : J U L Y 1 4 , 2 0 0 9 GSA Office of Governmentwide Policy F E D E R A L R E A L P R O P E R T Y C O U N C I L Federal Real Property Council Real Property Inventory - User Guidance for FY 2009 Reporting July 14, 2009 Page 2 T a b l e o f C o n t e n t s A. B A C K G R O U N D : E X E C U T I V E O R D E R 1 3 3 2 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 B . F R P C I N V E N T O R Y D A T A E L E M E N T S & D E S C R I P T I O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1. Real Property Type ...................................................................................................................................................................... 5 2. Real Property Use........................................................................................................................................................................

283

FRPC User Guidance -for FY2006  

Broader source: Energy.gov (indexed) [DOE]

10 GUIDANCE FOR 10 GUIDANCE FOR REAL PROPERTY INVENTORY REPORTING I S S U E D A T E : O C T O B E R 2 5 , 2 0 1 0 GS A Office of Governmentw ide Policy F E D E R A L R E A L P R O P E R T Y C O U N C I L Federal Real Property Council Real Property Inventory - User Guidance for FY 2010 Reporting October 25, 2010 Page 2 T a b l e o f C o n t e n t s A . B A C K G R O U N D : E X E C U T I V E O R D E R 1 3 3 2 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 B . F R P C I N V E N T O R Y D A T A E L E M E N T S & D E S C R I P T I O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1. Real Property Type ...................................................................................................................................................................... 5 2. Real Property Use ........................................................................................................................................................................ 5

284

Guidance for evaluation of operational emergency plans  

SciTech Connect (OSTI)

The purpose of this document is to provide guidance for development of emergency plans for the USDOE Office of Defense Programs, Office of Energy Research, and Office of Environmental Management facilities. It gathers emergency planning policy and guidance from applicable federal regulations, DOE Orders and related guidance documents. This material, along with recommended good practices, is presented as a checklist against which emergency plans can be reviewed by DOE Headquarters. The Office of Emergency Response (DP-23), Office of Environment, Safety and Health Technical Support (ER-8), and Office of Transportation, Emergency Management and Analytical Services (EM-26) will use this checklist to evaluate plans submitted by DP, ER, and EM field elements. The scope of this document encompasses plans for operational emergencies at DOE facilities, both nuclear and non-nuclear. Operational emergencies, as defined in Attachment 2 to DOE Order 5500.1B (April 30, 1991) are ``significant accidents, incidents, events, or natural phenomena which seriously degrade the safety or security of DOE facilities. Operational Emergencies apply to DOE reactors and other DOE facilities (nuclear and non-nuclear) involved with hazardous materials; DOE-controlled nuclear weapons, components, or test devices; DOE safeguards and security events; and transportation accidents involving hazardous materials under DOE control.``

NONE

1995-03-01T23:59:59.000Z

285

Maximizing expected utility over a knapsack constraint  

E-Print Network [OSTI]

The expected utility knapsack problem is to pick a set of items whose values are ... variables so as to maximize the expected utility of the total value of the items ...

2014-08-11T23:59:59.000Z

286

Results of a Strategic Assessment of NRC's Low-Level Radioactive Waste Program  

SciTech Connect (OSTI)

NRC recently completed a strategic assessment of its low-level radioactive waste (LLW) regulatory program. In this paper, we provide the results of this assessment - a prioritized list of activities for our LLW program in the next several years - along with a description of the circumstances that required us to undertake this assessment and the process we used. We obtained ideas from a wide variety of stakeholders on activities we could undertake, and we evaluated them in light of our overall strategic objectives for ensuring safety and security, as well as a number of other factors. We ranked 7 of the 20 activities evaluated as high priority. Their completion in the next several years will help to ensure that LLW will continue to be managed and disposed of safely and securely. (authors)

Bradford, A.W.; Camper, L.W.; Flanders, S.C.; Kennedy, J.E.; Shaffner, J.A.; Tokar, M.; Whited, A.R. [NRC LLW Branch, Mail Stop T-8-F-5, U.S. Nuclear Regulatory Commission, Washington DC (United States)

2008-07-01T23:59:59.000Z

287

Risk Assessment Guidance for Superfund Volume I: Human Health Evaluation Manual Supplemental Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-921314 1-921314 OSWER DIRECTIVE: 9285.6-03 March 25, 1991 RISK ASSESSMENT GUIDANCE FOR SUPERFUND VOLUME I: HUMAN HEALTH EVALUATION MANUAL SUPPLEMENTAL GUIDANCE "STANDARD DEFAULT EXPOSURE FACTORS" INTERIM FINAL Office of Emergency and Remedial Response Toxics Integration Branch U.S. Environmental Protection Agency Washington, D.C. 20460 (202)475-9486 REPRODUCED BY U.S.DEPARTMENT OF COMMERCE NATIONAL TECHNICAL INFORMATION SERVICE SPRINGFIELD, VA 22161 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 25 1991 S O L I D W A S T E A N D E M E R G E N C Y R E S P O N S E O F F I C E O F OSWER Directive 9285.6-03 MEMORANDUM SUBJECT: FROM: Human Health Evaluation Manual, Supplemental Guidance: TO: Director, Waste Management Division, Regions I, IV, V, & VII Director, Emergency & Remedial Response Division,

288

CANDU reactors, their regulation in Canada, and the identification of relevant NRC safety issues  

SciTech Connect (OSTI)

Atomic Energy of Canada, Limited (AECL) and its subsidiary in the US, are considering submitting the CANDU 3 design for standard design certification under 10 CFR Part 52. CANDU reactors are pressurized heavy water power reactors. They have some substantially different safety responses and safety systems than the LWRs that the commercial power reactor licensing regulations of the US Nuclear Regulatory Commission (NRC) have been developed to deal with. In this report, the authors discuss the basic design characteristics of CANDU reactors, specifically of the CANDU 3 where possible, and some safety-related consequences of these characteristics. The authors also discuss the Canadian regulatory provisions, and the CANDU safety systems that have evolved to satisfy the Canadian regulatory requirements as of December 1992. Finally, the authors identify NRC regulations, mainly in 10 CFR Parts 50 and 100, with issues for CANDU 3 reactor designs. In all, eleven such regulatory issues are identified. They are: (1) the ATWS rule ({section}50.62); (2) station blackout ({section}50.63); (3) conformance with Standard Review Plan (SRP); (4) appropriateness of the source term ({section}50.34(f) and {section}100.11); (5) applicability of reactor coolant pressure boundary (RCPB) requirements ({section}50.55a, etc); (6) ECCS acceptance criteria ({section}50.46)(b); (7) combustible gas control ({section}50.44, etc); (8) power coefficient of reactivity (GDC 11); (9) seismic design (Part 100); (10) environmental impacts of the fuel cycle ({section}51.51); and (11) (standards {section}50.55a).

Charak, I.; Kier, P.H. [Argonne National Lab., IL (United States)

1995-04-01T23:59:59.000Z

289

Expected dose for the seismic scenario classes in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the determination of expected dose to the reasonably maximally exposed individual (RMEI) specified in the NRC regulations for the YM repository for the seismic ground motion scenario class and the seismic fault displacement scenario class in the 2008 YM PA. The following topics are addressed: (i) definition of the seismic scenario classes and the determination of dose and expected dose to the RMEI, (ii) properties of the seismic ground motion scenario class, (iii) expected dose and uncertainty in expected dose to the RMEI for the seismic ground motion scenario class from 0 to 20,000 yr, (iv) expected dose and uncertainty in expected dose to the RMEI for the seismic ground motion scenario class from 0 to 106 yr, (v) properties of the seismic fault displacement scenario class including expected dose and uncertainty in expected dose to the RMEI from 0 to 20,000 yr and 0 to 106 yr, (vi) expected dose and uncertainty in expected dose to the RMEI for the combined ground motion and seismic fault displacement scenario class, and (vii) probabilities associated with seismic scenario classes. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

J.C. Helton; M.G. Gross; C.W. Hansen; C.J. Sallaberry; S.D. Sevougian

2014-01-01T23:59:59.000Z

290

Expected dose for the nominal scenario class in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the determination of expected (mean) dose to the reasonably maximally exposed individual (RMEI) specified in the NRC regulations for the YM repository for the nominal scenario class (i.e., under nominal or undisturbed conditions) in the 2008 YM PA. The following topics are addressed: (i) properties of the nominal scenario class and the determination of dose and expected (mean) dose to the RMEI, (ii) uncertainty in dose and resultant expected (mean) dose to the RMEI, (iii) expected (mean) dose to the RMEI from individual radionuclides, and (iv) numerical stability of the sampling-based procedure used to estimate the expected (mean) dose to the RMEI. The present paper is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional papers in the issue describe other aspects of the 2008 YM PA.

J.C. Helton; C.W. Hansen; C.J. Sallaberry

2014-01-01T23:59:59.000Z

291

NRC TLD Direct Radiation Monitoring Network. Volume 15, No. 4: Quarterly progress report, October--December 1995  

SciTech Connect (OSTI)

This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1995. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

Struckmeyer, R.

1996-03-01T23:59:59.000Z

292

Can. J. Fish. Aquat. Sci. 54(Suppl. 1): 6880 (1997). 1997 NRC Canada Comparison of hydrography and circulation on  

E-Print Network [OSTI]

Can. J. Fish. Aquat. Sci. 54(Suppl. 1): 68­80 (1997). © 1997 NRC Canada 68 Comparison 1990s caused below-normal air temperatures in eastern Canada, resulting in increased ice growth during spring. The reduced solar flux onto the ocean surface resulted in a 3- to 4-wk delay in the annual

deYoung, Brad

293

DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

Issues Guidance on Civil Penalties for EPCA Energy Efficiency Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations May 7, 2010 - 12:50pm Addthis Today, the Department of Energy issued Guidance on the Imposition of Civil Penalties for Violations of EPCA Standards and Certification Obligations. As explained in the Guidance, the Department's penalty policy is intended to advance three goals: (1) to deter future violations; (2) to ensure consistency and equity in the assessment of penalties; and (3) to encourage complete and timely resolution of any instances of non-compliance. The Department also sets forth its basic approach to the imposition of penalties for violations of DOE's standards and certification requirements. A complete version of the Guidance is available here.

294

DOE NEPA Guidance and Requirements - Search Index | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index The DOE NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use. The compressed (.zip) file contains all of these documents in their optimized and machine-readable format. The file also contains a "search index" that can be used to search for keywords and phrases in all the documents from one search form, without the need to install a separate program. Please direct any questions, comments, or feedback to: John.Jediny@hq.doe.gov Review the documents included in the Search Index as a List or Table NEPA Requirements and Guidance - Search Index.zip

295

DOE NEPA Guidance and Requirements - Search Index | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index The DOE NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use. The compressed (.zip) file contains all of these documents in their optimized and machine-readable format. The file also contains a "search index" that can be used to search for keywords and phrases in all the documents from one search form, without the need to install a separate program. Please direct any questions, comments, or feedback to: John.Jediny@hq.doe.gov Review the documents included in the Search Index as a List or Table NEPA Requirements and Guidance - Search Index.zip

296

Attachment G: Guidance on Headquarters Approval of State  

Broader source: Energy.gov (indexed) [DOE]

G: Guidance on Headquarters Approval of State G: Guidance on Headquarters Approval of State Agreements-in-Principle Attachment G: Guidance on Headquarters Approval of State Agreements-in-Principle Guidance on Headquarters Approval of State Agreements-in-Principle Introduction: In December 1993, the Office of Environmental Management (EM) informed states that the Department intended to extend the existing Agreements-in-Principle (AIPs) for another five-year term and would continue to negotiate new AIPs. The purpose of this memorandum is to provide guidance on Headquarters approval of State AIPs in the EM program. This guidance applies to both new and renegotiated AIPs. All Operations and Field Offices are directed to involve appropriate Headquarters organizations early in the negotiations to assure that draft agreements

297

State Agreement-In-Principle Program Guidance Memorandum | Department of  

Broader source: Energy.gov (indexed) [DOE]

State Agreement-In-Principle Program Guidance Memorandum State Agreement-In-Principle Program Guidance Memorandum State Agreement-In-Principle Program Guidance Memorandum United States GovernmentDepartment of Energy Memorandum DATE: December 22, 1995 REPLY TO ATTN OF: EM-75 SUBJECT: State Agreement-in-Principle Program Guidance TO: Manager, Albuquerque Operations Office Manager, Chicago Operations Office Manager, Idaho Operations Office Manager, Nevada Operations Office Manager, Oak Ridge Operations Office Manager, Ohio Field Office Manager, Richland Operations Office Manager, Rocky Flats Field Office Manager, Oakland Operations Office Manager, Savannah River Operations Office The purpose of this memorandum is to provide you with guidance on the State Agreement-in-Principle (AIP) program. The guidance includes a collection of

298

DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

Guidance on Civil Penalties for EPCA Energy Efficiency Guidance on Civil Penalties for EPCA Energy Efficiency Violations DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations May 7, 2010 - 12:50pm Addthis Today, the Department of Energy issued Guidance on the Imposition of Civil Penalties for Violations of EPCA Standards and Certification Obligations. As explained in the Guidance, the Department's penalty policy is intended to advance three goals: (1) to deter future violations; (2) to ensure consistency and equity in the assessment of penalties; and (3) to encourage complete and timely resolution of any instances of non-compliance. The Department also sets forth its basic approach to the imposition of penalties for violations of DOE's standards and certification requirements. A complete version of the Guidance is available here.

299

Research guidance studies. First quarterly progress report, 1996  

SciTech Connect (OSTI)

The overall objective of this project is to provide research guidance and quantification of research progress in the areas of direct and indirect coal liquefaction, coal/waste coprocessing, refining of coal-derived liquid fuels, and natural gas conversion. Specifically, the work is divided into two subtasks that relate to whether the technology application is direct or indirect. In subtask (a), Direct Coal Liquefaction technology is the subject of the analyses, and in subtask (b), Indirect Liquefaction, technologies will be evaluated in accordance with the priorities of the COR. Mitretek Systems has been developing detailed computer simulation models of direct and indirect coal and natural gas conversion systems for several years. These models are constantly being updated and improved as more data and better cost information becomes available.. These models also include detailed refinery models based on bench-scale upgrading -data of coal derived liquid fuels to specification transportation fuels. In addition to the simulation models of actual conversion system configurations, Mitretek is able to simulate innovative process configurations for coal and gas conversion to fuels, power, and chemicals. To supplement these system models and to provide a context to investigate expected energy use scenarios when alternate coal and natural gas based fuels will be needed, Mitretek`s staff has also developed world and country by country energy supply and demand models. This work will be accomplished by using the existing models where appropriate and by extending and modifying the system models where necessary.

Gray, D.; Tomlinson, G. [Mitretek Systems, McLean, VA (United States)

1996-10-01T23:59:59.000Z

300

Guidance on New Construction under an Energy Savings Performance Contract  

Broader source: Energy.gov (indexed) [DOE]

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Letter: Implementation of the Guidance for the Environmental Management  

Broader source: Energy.gov (indexed) [DOE]

Implementation of the Guidance for the Environmental Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards Letter: Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: Wade Waters, Chair, Savannah River Citizens' Advisory Board This letter is in response to a July 29, 2003 letter regarding implementation of the guidance for the Environmental Management Site Specific Advisory Boards. Roberson Letter - August 15, 2003 More Documents & Publications Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

302

Emergency Management Concepts, Existing Guidance, and Changes | Department  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management Concepts, Existing Guidance, and Changes Emergency Management Concepts, Existing Guidance, and Changes Emergency Management Concepts, Existing Guidance, and Changes Wednesday, September 19 Presenter: David Freshwater, Emergency Management Specialist, Office of Emergency Management, National Nuclear Security Administration Topics Covered: Emergency Management is last line of defense - have to consider when safety controls fail Longstanding consideration and analysis of "beyond design basis" Since 1991, Emergency Planning Hazards Assessments have analyzed a spectrum of events â—¦ Low consequence/High probability â—¦ High consequence/Low probability Have not had a "firm" upper bound Emergency Management Concepts, Existing Guidance, and Changes More Documents & Publications Summary of Emergency Management Results from Pilot Evaluations

303

Enforcement Guidance Supplement 01-22, Management and Independent Assessment  

Broader source: Energy.gov (indexed) [DOE]

EGS: 01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no

304

Notice of Guidance on Energy Efficiency Enforcement Regulations |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency Enforcement Regulations, Federal Register Vol. 74, No. 197 October 14, 2009. This notice sets forth the Department of Energy's (DOE's) interpretation of its energy efficiency enforcement regulations. These regulations provide for manufacturer submission of compliance statements and certification reports to DOE, maintenance of compliance records by manufacturers, and the availability of enforcement actions for improper certification or upon a determination of noncompliance. DOE also announces its intent to randomly select and review manufacturer compliance with these requirements and initiate enforcement

305

Guidance on New Construction under an Energy Savings Performance Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

306

Renewable Energy Financial Instruments Guidance Tool (REFINe) | Open Energy  

Open Energy Info (EERE)

Renewable Energy Financial Instruments Guidance Tool (REFINe) Renewable Energy Financial Instruments Guidance Tool (REFINe) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Financial Instruments Guidance Tool (REFINe) Focus Area: Renewable Energy Topics: Policy Impacts Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/0,,contentMDK:2298 Equivalent URI: cleanenergysolutions.org/content/renewable-energy-financial-instrument Language: English Policies: "Deployment Programs,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Training & Education Renewable Energy Financial Instruments Guidance Tool (REFINe) aims to assist policy in identifying appropriate financial instruments to scale-up

307

Draft Policy and Planning Guidance for Community Transition Activities...  

Office of Environmental Management (EM)

Work Force Restructuring Office of Worker and Community Transition Draft Policy and Planning Guidance for Community Transition Activities More Documents & Publications...

308

Guidance for State Energy Program Recipients on Policy and Procedures...  

Broader source: Energy.gov (indexed) [DOE]

for State Energy Program Recipients on Policy and Procedures Pursuant to the Closeout of American Recovery and Reinvestment Act Grants Guidance for State Energy Program Recipients...

309

POLICY GUIDANCE MEMORANDUM #35 Procedures for Compliance with...  

Broader source: Energy.gov (indexed) [DOE]

5 Procedures for Compliance with Nepotism and Misuse of Position POLICY GUIDANCE MEMORANDUM 35 Procedures for Compliance with Nepotism and Misuse of Position The purpose of this...

310

Policy Guidance Memorandum #37 Procedures for Excepted Service...  

Broader source: Energy.gov (indexed) [DOE]

7 Procedures for Excepted Service Exceptionally Well Qualified (EWQ) Appointments Policy Guidance Memorandum 37 Procedures for Excepted Service Exceptionally Well Qualified (EWQ)...

311

Guidance For Energy Efficiency And Conservation Block Grant Grantees...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

(Revised): October 17, 2012 ORIGINALLY ISSUED: December 7, 2009 SUBJECT: GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT GRANTEES ON FINANCING PROGRAMS. PURPOSE To...

312

Guidance for Energy Efficiency and Conservation Block Grant Grantees...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Conservation Bonds and New Clean Renewable Energy Bonds Guidance for Energy Efficiency and Conservation Block Grant Grantees on Qualified Energy Conservation Bonds and...

313

Guidance for Energy Efficiency and Conservation Block Grant Program...  

Energy Savers [EERE]

Grant Program Recipients on Formula Grants Guidance for Energy Efficiency and Conservation Block Grant Program Recipients on Formula Grants U.S. Department of Energy (DOE) Office...

314

Guidance for Energy Efficiency and Conservation Block Grant Recipients...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Energy Efficiency and Conservation Block Grant Recipients on Program Evaluation Guidelines Guidance for Energy Efficiency and Conservation Block Grant Recipients on Program...

315

Guidance For Energy Efficiency And Conservation Block Grant Grantees...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

For Energy Efficiency And Conservation Block Grant Grantees On Financing Programs Guidance For Energy Efficiency And Conservation Block Grant Grantees On Financing Programs U.S....

316

Guidance For Energy Efficiency And Conservation Block Grant Grantees...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

October 17, 2012 ORIGINALLY ISSUED: December 7, 2009 SUBJECT: GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT GRANTEES ON FINANCING PROGRAMS. PURPOSE To provide...

317

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Broader source: Energy.gov (indexed) [DOE]

of program implementation lessons-learned Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews More Documents & Publications...

318

Enforcement Guidance Supplement 03-02: Revision to Occurrence...  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the...

319

Adaptation to Climate Variability and Change: A Guidance Manual...  

Open Energy Info (EERE)

to Climate Variability and Change: A Guidance Manual for Development Planning Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Adaptation to Climate Variability and...

320

Greenhouse Gas Guidance and Reporting | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and manage their greenhouse gas (GHG) emissions to meet Federal goals and mitigate climate change. Federal Guidance Read the White House Council on Environmental Quality's...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Enforcement Guidance Supplement 01-01, Nuclear Weapon Program...  

Office of Environmental Management (EM)

OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for...

322

POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...  

Energy Savers [EERE]

15 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM 15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September...

323

National Planning for GHG Mitigation in Agriculture: A Guidance...  

Open Energy Info (EERE)

Jump to: navigation, search Tool Summary LAUNCH TOOL Name: National Planning for GHG Mitigation in Agriculture: A Guidance Document AgencyCompany Organization: Food and...

324

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program  

Broader source: Energy.gov [DOE]

This document contains the Final Guidance for the EPAct 2005 Section 242 Hydroelectric Incentive Program. Applications are due February 20, 2015.

325

Energy Department Releases New Guidance for Strengthening Cybersecurit...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

another great example of how our industry-government partnership is helping to strengthen grid security and resilience," said EEI President Tom Kuhn. "This guidance will further...

326

Enforcement Guidance Supplement 00-04: Factual Bases for Issuing...  

Broader source: Energy.gov (indexed) [DOE]

Enforcemen Guidance). In particular, it is important to provide contractors and others with explanations on how certain procedural mechanisms provided in Part 820 are utilized to...

327

POLICY GUIDANCE MEMORANDUM #28 Requirements for Non-Competitive...  

Energy Savers [EERE]

586-8481 More Documents & Publications Excepted Service EJ and EK Desk Reference DOE Handbook on Recruitment and Retention Incentives Policy Guidance Memorandum 37 Procedures for...

328

Enforcement Guidance Supplement 00-04: Factual Bases for Issuing...  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance). In particular, it is important to provide contractors and others with explanations on how certain procedural mechanisms provided in Part 820 are utilized to...

329

DOE Interim Guidance on Mercury Management Procedures and Standards...  

Broader source: Energy.gov (indexed) [DOE]

Services Waste Management Waste Disposition Long-Term Management and Storage of Elemental Mercury is in the Planning Stages DOE Interim Guidance on Mercury Management...

330

GSA - Guidance on Tribal Consultation | Open Energy Information  

Open Energy Info (EERE)

Tribal Consultation Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: GSA - Guidance on Tribal Consultation Abstract This webpage provides information...

331

Energy.gov Article Guidance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Article Guidance Principals and program offices are enthusiastically encouraged to submit content for consideration for Energy.gov's blog and our official social media channels....

332

LM Records and Information Management Transition Guidance (January 2015)  

Broader source: Energy.gov [DOE]

This guidance document establishes a framework for developing a Records and Information Management Transition Plan as part of the overall transition effort for a legacy site.

333

Energy Department Releases Guidance for Implementation of Cybersecurit...  

Energy Savers [EERE]

the framework's prioritized approach. In developing this guidance, we collaborated with private sector stakeholders through the Electricity Subsector Coordinating Council and the...

334

BLM Geothermal Guidance Documents Website | Open Energy Information  

Open Energy Info (EERE)

Documents Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Geothermal Guidance Documents Website Abstract This website contains a list...

335

Safety Planning Guidance for Hydrogen and Fuel Cell Projects  

Fuel Cell Technologies Publication and Product Library (EERE)

This guidance document provides information on safety requirements for hydrogen and fuel cell projects funded by the U.S. Department of Energy Fuel Cell Technologies Program.

336

Guidance on Ex Parte Communications | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on Ex Parte Communications Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations EIS-0493: FERC Notice of Availability of Final Environmental Impact Statement...

337

Enforcement Guidance Supplement 00-03, Specific Issues on Applicabilit...  

Broader source: Energy.gov (indexed) [DOE]

and Technical Specifications. Specifically, this guidance reaffirms that quality assurance (QA) controls required by 10 CFR 830 are not in any way limited by language...

338

FRPC User Guidance -for FY2006  

Broader source: Energy.gov (indexed) [DOE]

GSA OFFICE O GSA OFFICE O F GOVERNMENT-WIDE POLICY F E D E R A L R E A L P R O P E R T Y C O U N C I L 2012 GUIDANCE FOR REAL PROPERTY INVENTORY REPORTING I S S U E D A T E : J U N E 1 5 , 2 0 1 2 Federal Real Property Council 2012 GUIDANCE FOR REAL PROPERTY INVENTORY REPORTING June 15, 2012 2 T a b l e o f C o n t e n t s A . B A C K G R O U N D : E X E C U T I V E O R D E R 1 3 3 2 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 B . F R P C I N V E N T O R Y D A T A E L E M E N T S & D E S C R I P T I O N S : O W N E D A N D O T H E R W I S E M A N A G E D A S S E T S . . . . . . . . . . . . . . . 4 1. Real Property Type ...................................................................................................................................................................... 5 2. Real Property Use ........................................................................................................................................................................ 5

339

Cask system design guidance for robotic handling  

SciTech Connect (OSTI)

Remote automated cask handling has the potential to reduce both the occupational exposure and the time required to process a nuclear waste transport cask at a handling facility. The ongoing Advanced Handling Technologies Project (AHTP) at Sandia National Laboratories is described. AHTP was initiated to explore the use of advanced robotic systems to perform cask handling operations at handling facilities for radioactive waste, and to provide guidance to cask designers regarding the impact of robotic handling on cask design. The proof-of-concept robotic systems developed in AHTP are intended to extrapolate from currently available commercial systems to the systems that will be available by the time that a repository would be open for operation. The project investigates those cask handling operations that would be performed at a nuclear waste repository facility during cask receiving and handling. The ongoing AHTP indicates that design guidance, rather than design specification, is appropriate, since the requirements for robotic handling do not place severe restrictions on cask design but rather focus on attention to detail and design for limited dexterity. The cask system design features that facilitate robotic handling operations are discussed, and results obtained from AHTP design and operation experience are summarized. The application of these design considerations is illustrated by discussion of the robot systems and their operation on cask feature mock-ups used in the AHTP project. 11 refs., 11 figs.

Griesmeyer, J.M.; Drotning, W.D.; Morimoto, A.K.; Bennett, P.C.

1990-10-01T23:59:59.000Z

340

Top quark physics expectations at the LHC  

E-Print Network [OSTI]

physics expectations at the LHC Andrei Gaponenko, on behalfbe produced copiously at the LHC. This will make possiblepurpose detectors at the LHC, which will provide proton-

Gaponenko, Andrei; ATLAS Collaboration; CMS Collaboration

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Transition from Consultation to Monitoring-NRC's Increasingly Focused Review of Factors Important to F-Area Tank Farm Facility Performance - 13153  

SciTech Connect (OSTI)

In consultation with the NRC, DOE issued a waste determination for the F-Area Tank Farm (FTF) facility in March 2012. The FTF consists of 22 underground tanks, each 2.8 to 4.9 million liters in capacity, used to store liquid high-level waste generated as a result of spent fuel reprocessing. The waste determination concluded stabilized waste residuals and associated tanks and auxiliary components at the time of closure are not high-level and can be disposed of as LLW. Prior to issuance of the final waste determination, during the consultation phase, NRC staff reviewed and provided comments on DOE's revision 0 and revision 1 FTF PAs that supported the waste determination and produced a technical evaluation report documenting the results of its multi-year review in October 2011. Following issuance of the waste determination, NRC began to monitor DOE disposal actions to assess compliance with the performance objectives in 10 CFR Part 61, Subpart C. To facilitate its monitoring responsibilities, NRC developed a plan to monitor DOE disposal actions. NRC staff was challenged in developing a focused monitoring plan to ensure limited resources are spent in the most cost-effective manner practical. To address this challenge, NRC prioritized monitoring areas and factors in terms of risk significance and timing. This prioritization was informed by NRC staff's review of DOE's PA documentation, independent probabilistic modeling conducted by NRC staff, and NRC-sponsored research conducted by the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX. (authors)

Barr, Cynthia; Grossman, Christopher; Alexander, George; Parks, Leah; Fuhrmann, Mark; Shaffner, James; McKenney, Christepher [U.S. NRC, Rockville, MD (United States)] [U.S. NRC, Rockville, MD (United States); Pabalan, Roberto; Pickett, David [Center for Nuclear Waste Regulatory Analyses, Southwest Research Institute, San Antonio, TX (United States)] [Center for Nuclear Waste Regulatory Analyses, Southwest Research Institute, San Antonio, TX (United States); Dinwiddie, Cynthia [Southwest Research Institute, San Antonio, TX (United States)] [Southwest Research Institute, San Antonio, TX (United States)

2013-07-01T23:59:59.000Z

342

Guidance for Meeting Executive Order 13514 Water Goals  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program offers guidance to help agencies meet Executive Order (E.O.) 13514 water goals by summarizing key points in the Council on Environmental Quality’s (CEQ) guidance document, Implementing Instructions: Federal Agency Implementation of Water Efficiency and Management Provisions of E.O. 13514.

343

REGULATORY GUIDANCE No. 05-09 Date: 7 December 2005  

E-Print Network [OSTI]

REGULATORY GUIDANCE LETTER No. 05-09 Date: 7 December 2005 SUBJECT: Special Area Management Plans 1 within the coastal zone." In Regulatory Guidance Letter (RGL) 86-10, Special Area Management Plans (SAMPs with the traditional case-by-case review. The objectives are that developmental interests can plan with predictability

US Army Corps of Engineers

344

Climate Change Guidance: A Pragmatic Approach to Client  

E-Print Network [OSTI]

10/21/11 Climate Change Guidance: A Pragmatic Approach to Client Needs Climate, Water and Ecosystems- Shaping the Great Plains October 13, 2011 #12;10/21/11 Climate Change Guidance: A Pragmatic Approach to Client NeedsClimate Science ­ 2011 ·Yes, the climate is changing. ·Climate science is changing

Nebraska-Lincoln, University of

345

Annex 2 Risk Guidance Science Programme Office Project Management  

E-Print Network [OSTI]

1 Annex 2 ­ Risk Guidance Science Programme Office Project Management Guidance on Risk Management the risk. This approach underpins the key objective of risk management. Basic Principles and Process STFC management structure and internal reporting within the STFC's Science Programme Office (SPO) through its

346

Waypoint Guidance for Small UAVs in Wind John Osborne  

E-Print Network [OSTI]

Waypoint Guidance for Small UAVs in Wind John Osborne and Rolf Rysdyk University of Washington, Seattle, WA, 98115,USA I. abstract Wind is often ignored or only implicitly addressed in design of guidance algorithms. For small UAVs exposed to strong winds, wind has a very significant nonlinear effect

Washington at Seattle, University of

347

Environmental Guidance Program Reference Book: American Indian Religious Freedom Act  

SciTech Connect (OSTI)

This Reference Book contains a copy of the American Indian Religious Freedom Act and guidance for DOE compliance with the statute. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Updates that include important new requirements will be provided periodically.

Not Available

1987-11-01T23:59:59.000Z

348

Forestry Commission Wales Guidance on rental levels for Hydro Power  

E-Print Network [OSTI]

initiated a process to facilitate the development of small- scale hydro-electricity schemes on land ownedForestry Commission Wales Guidance on rental levels for Hydro Power Guidance on rental levels for hydro power projects Tel: 02920 475961 Email: hydrowales@forestry.gsi.gov.uk Version 1.0 Mike Pitcher 17

349

Supporting Agile Organizations with a Decision Guidance Query Language  

Science Journals Connector (OSTI)

Decision optimization is widely used in many decision guidance and support systems DGSS to support business decisions such as procurement, scheduling, and planning. In spite of rapid changes in users' requirements, the implementation of DGSS is typically ... Keywords: Agile Organizations, Decision Guidance, Decision Support, Optimization

Alexander Brodsky; Nathan Egge; X. Wang

2012-04-01T23:59:59.000Z

350

Multiyear Program Plan Template - Phase II Guidance  

Broader source: Energy.gov (indexed) [DOE]

Multiyear Program Plan Template Multiyear Program Plan Template Phase II Guidance June 30, 2006 Foreword: The Purpose and Value of a Multiyear Program Plan Multiyear Program Plans (MYPPs) are intended primarily to serve as operational guides for programs to manage their activities and as a source of information to help EERE management identify clear linkages between key program activities and progress toward goals. It is understood, however, that they are also read by a broad group of program stakeholders and may serve other purposes as well. Strategic planning in government is closely integrated with budgeting. In effective organizations, planning and strategy guide budget requests, not the other way around. Strategic planning enables programs to create logical budgets and manage their activities toward programmatic and

351

Guidance for Developing Ecological Soil Screening Levels  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Developing Developing Ecological Soil Screening Levels OSWER Directive 9285.7-55 U.S. Environmental Protection Agency Office of Solid Waste and Emergency Response 1200 Pennsylvania Avenue, N.W. Washington, DC 20460 November 2003 This Page Intentionally Left Blank EXECUTIVE SUMMARY This document describes the process used to derive a set of risk-based ecological soil screening levels (Eco-SSLs) for many of the soil contaminants that are frequently of ecological concern for plants and animals at hazardous waste sites and provides guidance for their use. The Eco-SSL derivation process represents the group effort of a multi-stakeholder workgroup consisting of federal, state, consulting, industry, and academic participants led by the U.S. Environmental Protection Agency Office of Superfund Remediation and Technology Innovation (OSRTI). The

352

Enforcement Guidance Supplement - EGS 99-03  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement Department of Energy Washington DC 20585 October 20, 1999 MEMORANDUM FOR: DOE and Contractor PAAA Coordinators FROM: R. Keith Christopher Director Office of Enforcement and Investigation SUBJECT: Enforcement Guidance Supplement 99-03: Limitation of 10 CFR Part 830 to Equipment Referenced in the Safety Analysis Report Recently this Office received a reply to a Preliminary Notice of Violation (PNOV), although not denying any facts or conclusions in the PNOV and agreeing to pay the full imposed Civil Penalty, included arguments that some of the equipment cited in the PNOV was not, in their view, subject to the requirements of Part 830. The contractor argued that only equipment referenced in the Safety Analysis Report (SAR), Technical

353

GC GUIDANCE ON MEETINGS WITH UNION OFFICIALS  

Broader source: Energy.gov (indexed) [DOE]

MEETINGS WITH UNION OFFICIALS MEETINGS WITH UNION OFFICIALS Department officials often receive requests to meet with officials of labor unions whose members are employees of Department contractors. Department officials should feel free to meet with such union officials subject to this guidance. Department officials must take care, however, not to insert themselves or the government inappropriately into the relationship between the unions and the contractors Sometimes unions will wish to meet with Department officials simply to learn about publicly stated Department plans or to make the Department aware of union concerns regarding a DOE policy applicable to contractors on a complex-wide basis. Department officials also may find it useful to initiate meetings with union officials to hear about

354

Acquisition Career Management Program Manual Interim Guidance  

Broader source: Energy.gov (indexed) [DOE]

Management Program Manual Management Program Manual Interim Guidance Partial Revision Chapter 11 Contracting Officers Representatives (COR) Contracting Officers Representatives Background FAI published a report in 2003 on the competencies necessary for the COR job function and the US Merit Systems Protection Board published a report in 2005 entitled "Contracting Officer Representatives: Managing the Government's Technical Experts to Achieve Positive Contract Outcomes." Both reports are available at www.fai.gov. A common theme in these reports is the need to organize and support the COR community to ensure that acquisition management is implemented effectively. Some of the findings and recommendations of the reports are: * CORs must be formally delegated authority to work on particular contracts

355

Letter: Direction and Guidance for Implementing Direct DOE Relationship &  

Broader source: Energy.gov (indexed) [DOE]

Letter: Direction and Guidance for Implementing Direct DOE Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board This letter is in response to a November 21, 2003 letter regarding direction and guidance for implementing direct DOE relationship and funding for Environmental Management Site Specific Advisory Boards. Roberson Letter - December 12, 2003 More Documents & Publications Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Memorandum: Direction and Guidance for Implementing Direct DOE Relationship

356

Greenhouse Gas Guidance and Reporting | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance and Guidance and Reporting Greenhouse Gas Guidance and Reporting October 7, 2013 - 10:05am Addthis Federal agencies are required to inventory and manage their greenhouse gas (GHG) emissions to meet Federal goals and mitigate climate change. Federal Guidance Read the White House Council on Environmental Quality's (CEQ), Federal Greenhouse Gas Accounting and Reporting Guidance, and associated Technical Support Document. Accounting and Reporting Resources Visit the FedCenter Greenhouse Gas Inventory Reporting website to find the following resources and tools to help complete GHG inventory reporting requirements under Executive Order 13514: FEMP and CEQ Reporting Resources: Core documents for Federal GHG reporting Checklist: Step-by-step introduction to GHG accounting

357

Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid  

Broader source: Energy.gov (indexed) [DOE]

Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Investment Grants Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Investment Grants March 10, 2010 - 12:00am Addthis Washington, DC - The Department of Treasury and the Department of Energy announced today new guidance on the tax treatment for grantees receiving Recovery Act funding under the $3.4 billion Smart Grid Investment Grant program. Under the guidance released today, the Internal Revenue Service is providing a safe harbor under section 118(a) of the Internal Revenue Code for corporations receiving funding under the program. With the determination that Smart Grid Investment Grants to corporations are non-taxable, corporate utilities will be able to launch their

358

Memorandum: Revised Guidance for the Office of Environmental Management  

Broader source: Energy.gov (indexed) [DOE]

Revised Guidance for the Office of Environmental Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards Memorandum: Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (J. Bierer, T. Martin, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) The purpose of this memorandum is to provide guidance and direction for restructuring and managing the Environmental Management (EM) Site Specific Advisory Boards procurement mechanisms that support activities of the Boards. Roberson Memorandum - July 7, 2003 More Documents & Publications Letter: Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding

359

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and  

Broader source: Energy.gov (indexed) [DOE]

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping This Council on Environmental Quality scoping guidance document consists of advice on what works and what does not, based on the experience of many agencies and other participants in scoping. It is intended to make generally available the results of the Council's research, and to encourage the use of better techniques for ensuring public participation and efficiency in the scoping process. CEQ_Scoping_Guidance.pdf More Documents & Publications Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping A Citizen's Guide to the NEPA: Having Your Voice Heard

360

DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on  

Broader source: Energy.gov (indexed) [DOE]

Interpretive Rule and Provides Enforcement Guidance Interpretive Rule and Provides Enforcement Guidance on Showerheads DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on Showerheads March 4, 2011 - 5:27pm Addthis The Department has withdrawn as unwarranted the draft interpretative rule setting out the Department's views on the definition of a "showerhead" for purposes of the water conservation standard enacted by Congress in 1992. To provide certainty going forward, however, the Department today provides a brief enforcement guidance, which balances the Department's obligation to enforce the congressional standard with its determination to avoid needless economic dislocation. The guidance, available here, explains how the Department intends to enforce the 1992 law and provides manufacturers a

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Office of Personnel Management (OPM) Guidance on Diversity and Inclusion |  

Broader source: Energy.gov (indexed) [DOE]

Office of Personnel Management (OPM) Guidance on Diversity and Office of Personnel Management (OPM) Guidance on Diversity and Inclusion Office of Personnel Management (OPM) Guidance on Diversity and Inclusion The following documents are from the Office of Personnel Management (OMP)'s Office of Diversity and Inclusion, which is responsible for reviewing and evaluating plans, reports, and programs for conformance with various laws, regulations, and directives relating to diversity and inclusion. Governement-Wide Diversity and Inclusion Strategic Plan and Guidance: Executive Order 13583, issued on August 18, 2011, requires OPM to publish a Government-Wide Diversity and Inclusion Strategic Plan, and guidance to agencies. Program Reviews: The Office of Personnel Management (OMP)'s Office of Diversity and Inclusion prepares program reviews and annual accomplishment

362

Guidance for Data Useability in Risk Assessment (Part A)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Superfund Superfund Guidance for Data Useability in Risk Assessment (Part A) Final April 1992 Guidance for Data Useability in Risk Assessment (Part A) Final Notice: Guidance for Radioanalytical Data Usability in Risk Assessment is Given in Part B Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 NOTICE The policies and procedures set forth here are intended as guidance to U.S. Environmental Protection Agency and other government employees. They do not constitute rulemaking by the Agency, and may not be relied on to create a substantive or procedural right enforceable by any other person. The U.S. Environmental Protection Agency may take action that is at variance with the policies and procedures in this guidance and may change them at any time without

363

Guidance Regarding Actions That May Proceed During the NEPA Process:  

Broader source: Energy.gov (indexed) [DOE]

Actions That May Proceed During the NEPA Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions More Documents & Publications NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to

364

Guidance on Ex Parte Communications | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

on Ex Parte Communications on Ex Parte Communications Guidance on Ex Parte Communications Notice of guidance on ex parte communications. The Department of Energy sets forth guidance on ex parte communications during informal rulemaking proceedings. The guidance is intended to encourage the public to provide DOE with all information necessary to develop rules that advance the public interest, while ensuring that rulemaking proceedings are not subject to improper influence from off-the-record communications. As President Obama stated in a January 21, 2009 memorandum, "Executive departments and agencies should offer Americans increased opportunities to participate in policymaking and to provide their Government with the benefits of their collective expertise and information." (74 Fed. Reg. 4685) DOE intends this guidance to

365

Adaptation to Climate Variability and Change: A Guidance Manual for  

Open Energy Info (EERE)

Adaptation to Climate Variability and Change: A Guidance Manual for Adaptation to Climate Variability and Change: A Guidance Manual for Development Planning Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Adaptation to Climate Variability and Change: A Guidance Manual for Development Planning Agency/Company /Organization: United States Agency for International Development Sector: Climate, Energy, Land, Water Topics: Adaptation Resource Type: Guide/manual Website: pdf.usaid.gov/pdf_docs/PNADJ990.pdf References: Adaptation to Climate Variability and Change: A Guidance Manual for Development Planning[1] "This Adaptation Guidance Manual is the first of several tools we are developing to assist planners and stakeholders as they cope with a changing climate. As we work with Missions to apply the methods described here, we

366

Memorandum: Guidance for Participation of the EM SSAB, Stakeholders,  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Participation of the EM SSAB, Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request Memorandum: Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request From: Dae Y. Chung, Principle Deputy Assistant Secretary for EM (EM-2) Subject: Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request The purpose of this memorandum is to transmit guidance for formal, routine, and structured involvement of the public; including, but not limited to, the Environmental Management (EM) Site-Specific Advisory Board (SSAB) members, state regulators , local government officials, community groups, and Tribal government officials (herein

367

Department of Energy Issues Federal Fleet Management Guidance | Department  

Broader source: Energy.gov (indexed) [DOE]

Federal Fleet Management Guidance Federal Fleet Management Guidance Department of Energy Issues Federal Fleet Management Guidance April 14, 2010 - 12:00am Addthis Washington, D.C. - The U.S. Department of Energy's (DOE) Federal Energy Management Program today released its Federal Fleet Management Guidance, meeting a requirement of President Obama's Executive Order (E.O. 13514) on Federal Leadership in Environmental, Energy and Economic Performance. This is the first comprehensive guidance to address the environmental impact of the Federal fleet and will help agencies develop petroleum and greenhouse gas (GHG) emissions reduction strategies. In signing E.O. 13514, President Obama called on Federal agencies to reduce petroleum fuel use by 2 percent each year from 2005 through 2020, for a

368

DOE NEPA Guidance and Requirements - Search Index - Table of Contents |  

Broader source: Energy.gov (indexed) [DOE]

Table of Table of Contents DOE NEPA Guidance and Requirements - Search Index - Table of Contents Return to Download Page The DOE NEPA Guidance and Requirements - Search Index includes: NEPA Guidance and Requirements Documents Issued by Published A Brief Guide - DOE-wide Contracts For NEPA Documentation DOE 2003 A Citizen's Guide to the NEPA - Having Your Voice Heard CEQ 2007 A Resource Handbook on DOE Transportation Risk Assessment DOE 2002 Actions During the NEPA Process - Interim Actions DOE 2003 Administrative Record Guidance DOJ 1991 Aligning the NEPA Process with EMS CEQ 2007 Alternative Actions For Analysis in Site-wide NEPA Reviews DOE 1992 Amended Environmental Impact Statement Filing System Guidance EPA 2012 Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA

369

Guidance on NEPA Review for Corrective Actions under the Resource  

Broader source: Energy.gov (indexed) [DOE]

Guidance on NEPA Review for Corrective Actions under the Resource Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

370

Office of Personnel Management (OPM) Guidance on Diversity and Inclusion |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Personnel Management (OPM) Guidance on Diversity and Office of Personnel Management (OPM) Guidance on Diversity and Inclusion Office of Personnel Management (OPM) Guidance on Diversity and Inclusion The following documents are from the Office of Personnel Management (OMP)'s Office of Diversity and Inclusion, which is responsible for reviewing and evaluating plans, reports, and programs for conformance with various laws, regulations, and directives relating to diversity and inclusion. Governement-Wide Diversity and Inclusion Strategic Plan and Guidance: Executive Order 13583, issued on August 18, 2011, requires OPM to publish a Government-Wide Diversity and Inclusion Strategic Plan, and guidance to agencies. Program Reviews: The Office of Personnel Management (OMP)'s Office of Diversity and Inclusion prepares program reviews and annual accomplishment

371

DOE's General Counsel Releases Guidance on Ex Parte Communications During  

Broader source: Energy.gov (indexed) [DOE]

DOE's General Counsel Releases Guidance on Ex Parte Communications DOE's General Counsel Releases Guidance on Ex Parte Communications During Informal Rulemaking Proceedings DOE's General Counsel Releases Guidance on Ex Parte Communications During Informal Rulemaking Proceedings October 15, 2009 - 10:24am Addthis Washington, DC - The Department of Energy today announced guidance on ex parte communications during informal rulemaking proceedings. The guidance is intended to encourage the public to provide DOE with all information necessary to develop rules that advance the public interest, while ensuring that rulemaking proceedings are not subject to improper influence from off-the-record communications. As President Obama stated in a January 21, 2009 memorandum, "Executive departments and agencies should offer Americans

372

Letter: Direction and Guidance for Implementing Direct DOE Relationship &  

Broader source: Energy.gov (indexed) [DOE]

Letter: Direction and Guidance for Implementing Direct DOE Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board This letter is in response to a November 21, 2003 letter regarding direction and guidance for implementing direct DOE relationship and funding for Environmental Management Site Specific Advisory Boards. Roberson Letter - December 12, 2003 More Documents & Publications Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Memorandum: Direction and Guidance for Implementing Direct DOE Relationship

373

Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 98-01:Duration of Investigations Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and Investigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix

374

2011 Workforce Analysis and Staffing Plan Report Memo, Guidance and  

Broader source: Energy.gov (indexed) [DOE]

1 Workforce Analysis and Staffing Plan Report Memo, Guidance and 1 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2011 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE 0 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process continues to cover technical capability needs to address defense nuclear facility and related operational hazards. Memo and Workforce Analysis Guidance for FR, SSO, STSM & TQP Template-2011.docx Description TEMPLATE More Documents & Publications 2012 Workforce Analysis and Staffing Plan Report Memo, Guidance and

375

A guide to CERCLA site assessment. Environmental Guidance  

SciTech Connect (OSTI)

This Pocket Guide is a condensed version of information provided in three EPA documents: Guidance for Performing Preliminary Assessments Under CERCLA, Guidance for Performing Site Inspections Under CERCLA, and Hazard Ranking System Guidance Manual. Additionally the guide provides a DOE perspective on site assessment issues and information on the Federal Agency Hazardous Waste Compliance Docket as well as data sources for DOE site assessments. The guide is intended to present this information in a simple, portable, and direct manner that will allow the user to effectively focus on those aspects of the site assessment process of interest. The guide is not intended as a substitute for the three EPA guidance documents mentioned previously. DOE investigators should be thoroughly familiar with the EPA guidance before conducting site assessments. Use this pocketguide as an overview of procedures and requirements and as a field guide.

Not Available

1994-02-01T23:59:59.000Z

376

2012 Workforce Analysis and Staffing Plan Report Memo, Guidance and  

Broader source: Energy.gov (indexed) [DOE]

Workforce Analysis and Staffing Plan Report Memo, Guidance and Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2012 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE O 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process continues to cover technical capability needs to address defense nuclear facility and related operational hazards. Memo and Workforce Analysis Guidance for FR, SSO, STSM & TQP Template-2012.docx Description TEMPLATE More Documents & Publications 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and

377

2013 Workforce Analysis and Staffing Plan Report Memo, Guidance and  

Broader source: Energy.gov (indexed) [DOE]

3 Workforce Analysis and Staffing Plan Report Memo, Guidance and 3 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2013 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE 0 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process continues to cover technical capability needs to address defense nuclear facility and related operational hazards. Memo and Workforce Analysis Guidance for FR, SSO, STSM & TQP Template-2013.docx Description TEMPLATE More Documents & Publications 2012 Workforce Analysis and Staffing Plan Report Memo, Guidance and

378

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs.

379

Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid  

Broader source: Energy.gov (indexed) [DOE]

Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Investment Grants Treasury, Energy Announce Guidance for Tax Treatment of Smart Grid Investment Grants March 10, 2010 - 12:00am Addthis Washington, DC - The Department of Treasury and the Department of Energy announced today new guidance on the tax treatment for grantees receiving Recovery Act funding under the $3.4 billion Smart Grid Investment Grant program. Under the guidance released today, the Internal Revenue Service is providing a safe harbor under section 118(a) of the Internal Revenue Code for corporations receiving funding under the program. With the determination that Smart Grid Investment Grants to corporations are non-taxable, corporate utilities will be able to launch their

380

Software Quality Assurance: Directives and Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directives and Guidance Directives and Guidance DOE O 414.1D, Quality Assurance DOE G 414.1-4, Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance DOE Order O 414.1D, Quality Assurance, includes Attachment 4 addressing SQA requirements for nuclear safety applications at DOE nuclear facilities. The DOE O 414.1D was issued April 25, 2011. This Order and its associated Guide for safety software, DOE G 414.1-4, Safety Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements. The Order identifies 10 software quality work activities that are to be performed using the graded approach specified in the Order. These 10 work activities are: (1) software project management, (2) software risk management, (3) software configuration management, (4) procurement and vendor management, (5) software requirements identification and management, (6) software design and implementation, (7) software safety design, (8) verification and validation, (9) problem reporting and corrective action, and (10) training of personnel in the design, development, use and evaluation of safety software. These 10 work activities were consolidated from practices and activities identified in several well known consensus standards and federal requirements. Safety software must be acquired, developed and implemented using ASME NQA-1-2008 with the NQA-1a-2009 addenda (or later edition), Quality Assurance Requirements for Nuclear Facility Applications, Part 1 and Subpart 2.7, or other national or international consensus standards that provide an equivalent level of quailty assurance requirements as NQA-1-2008.

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

D & D screening risk evaluation guidance  

SciTech Connect (OSTI)

The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D&D) facilities. Although this method has been developed for D&D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D&D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the hypothetical risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risks to human health due to factors other than that of contaminants. Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form, and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, as determined on a project-by-project basis.

Robers, S.K.; Golden, K.M.; Wollert, D.A.

1995-09-01T23:59:59.000Z

382

Draft For-Profit Audit Guidance (FY 2011) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft For-Profit Audit Guidance (FY 2011) Draft For-Profit Audit Guidance (FY 2011) For-ProfitAuditGuidance(Part I)Federal Register0.docx For-ProfitAuditGeneralComplianceS...

383

Summary of Information Presented at an NRC-Sponsored Low-Power Shutdown Public Workshop, April 27, 1999, Rockville, Maryland  

SciTech Connect (OSTI)

This report summarizes a public workshop that was held on April 27, 1999, in Rockville, Maryland. The workshop was conducted as part of the US Nuclear Regulatory Commission's (NRC) efforts to further develop its understanding of the risks associated with low power and shutdown operations at US nuclear power plants. A sufficient understanding of such risks is required to support decision-making for risk-informed regulation, in particular Regulatory Guide 1.174, and the development of a consensus standard. During the workshop the NRC staff discussed and requested feedback from the public (including representatives of the nuclear industry, state governments, consultants, private industry, and the media) on the risk associated with low-power and shutdown operations.

Wheeler, Timothy A.; Whitehead, Donnie W.; Lois, Erasmia

1999-07-01T23:59:59.000Z

384

ETHICS FURLOUGH GUIDANCE 1. This information paper provides general ethics guidance for Army employees who want to  

E-Print Network [OSTI]

ETHICS FURLOUGH GUIDANCE 1. This information paper provides general ethics guidance for Army that they remain subject to the "normal" ethics rules (e.g., Joint Ethics Regulation), when furloughed. Some is with a prohibited source, the STOCK Act requires that they notify the appropriate ethics office within 3-days

US Army Corps of Engineers

385

Construction Timing and Expectations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction Timing and Expectations Construction Timing and Expectations Construction Timing and Expectations October 16, 2013 - 5:07pm Addthis Creating a detailed construction schedule that allows all the project elements to be coordinated in a timely manner is fundamental to any successful construction project. The construction schedule should take into account that many tasks cannot be started before others are finished. It should also account for special schedule considerations related to renewable energy systems. Key elements of most new construction or major renovation projects include landscape, structural, architectural, mechanical, electrical, plumbing, communication systems, and renewable energy systems. Maintaining the highest quality of construction across all elements is fundamental to any

386

Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094  

SciTech Connect (OSTI)

Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted [Nuclear Regulatory Commission (United States)

2012-07-01T23:59:59.000Z

387

Brain MRI Classification using the Expectation Maximization  

E-Print Network [OSTI]

Brain MRI Classification using the Expectation Maximization made a brain magnetic resonance image (MRI) classification algorithm that uses a twostage applied to a set of normal brain MR images for further testing. We accomplished a working

Chen, Tsuhan

388

EECBG Program Notice 10-020B, Guidance for Energy Efficiency...  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Energy Efficiency and Conservation Block Grant Recipients on Closeout Procedures EECBG Program Notice 10-020B, Guidance for Energy Efficiency and Conservation Block...

389

EECBG Program Notice 09-002B - Guidance for Energy Efficiency...  

Broader source: Energy.gov (indexed) [DOE]

B - Guidance for Energy Efficiency and Conservation Block Grant Grantees on financing programs EECBG Program Notice 09-002B - Guidance for Energy Efficiency and Conservation Block...

390

POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract Specialist positions  

Broader source: Energy.gov [DOE]

Policy Guidance Memorandum #34B serves as an amendment to Policy Guidance Memorandum #34A regarding the use of the Direct Hire Authority for Contract Specialist positions.

391

Guidance: Incorporating EPA's Pollution Prevention Strategy into Environmental Reviews  

Broader source: Energy.gov (indexed) [DOE]

$'1 $'1 f%'1OIR A N Iv { JM ............................................... EiW'KRO>31ENTAL PROTECTIOX AGENCY OFF~E C)F FEI)ERAL ACTIVITIES Guidance on Incorporating EPA's Pollution Prevention Strategy ,' into EPA's Environmental Revielv Process The Office of Federal Activities (OFA) is issuing guidance which incorporates the Environmental Protection Agency (EPA) Pollution Prevention Strategy into the Agency's National Environmental Policy Act (NEPA) and Section 309 of the Clean Air Act review processes. Prevention To implement thePollution Act of 1990, this guidance focuses primarily upon influencing federal agencies' policies, practices, and regulatory functions to incorporate pollution prevention into their planning and decision-making. IMckzround

392

Energy Design Guidance Checklist | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Design Guidance Checklist Design Guidance Checklist Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

393

Guidance for Federal Departments and Agencies on Establishing, Applying,  

Broader source: Energy.gov (indexed) [DOE]

for Federal Departments and Agencies on Establishing, for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act This guidance from the Council on Environmental Quality provides methods for substantiating categorical exclusions, clarifies the process for establishing categorical exclusions, outlines how agencies should engage the public when establishing and using categorical exclusions, describes how agencies can document the use of categorical exclusions, and recommends periodic agency review of existing categorical exclusions. Final Guidance for Federal Departments and Agencies on Establishing,

394

Microsoft Word - Showerhead Guidance _3-4__final_ _2_.docx  

Broader source: Energy.gov (indexed) [DOE]

Showerhead Enforcement Guidance Showerhead Enforcement Guidance Issued: March 4, 2011 On February 3, 2011, the Department of Energy withdrew from OMB review, as unwarranted, the draft interpretative rule setting out the Department's views on the definition of a "showerhead" under the Energy Policy Conservation Act (EPCA) - and we formally withdraw that draft interpretive rule from consideration today. Nevertheless, to provide certainty to all stakeholders, the Department has decided to issue this brief enforcement guidance setting forth how it intends to enforce the law enacted by Congress in 1992 - yet do so in way that avoids needless economic dislocation. * * * * * * * * * * * * * * * * * * * * * * * * * * * * In May 2010, the Department of Energy issued a draft interpretative rule on the definition

395

Building Energy Use Benchmarking Guidance | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Use Benchmarking Guidance Use Benchmarking Guidance Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

396

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

397

EPA Climate Leaders Mobile Source Guidance | Open Energy Information  

Open Energy Info (EERE)

EPA Climate Leaders Mobile Source Guidance EPA Climate Leaders Mobile Source Guidance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: EPA Climate Leaders Mobile Source Guidance Agency/Company /Organization: United States Environmental Protection Agency Sector: Energy Focus Area: Transportation Phase: Determine Baseline Topics: GHG inventory Resource Type: Guide/manual Website: www.epa.gov/climateleaders/resources/cross-sector.html Country: United States Cost: Free UN Region: Northern America References: http://www.epa.gov/climateleaders/resources/cross-sector.html Logo: EPA Climate Leaders Mobile Source Guidance "This module is used to identify and estimate direct GHG emissions associated with fossil fuel combustion in owned or operated mobile sources. The module is divided into Road, Air, Waterborne, Rail Transport, and Other

398

2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and  

Broader source: Energy.gov (indexed) [DOE]

0 Workforce Analysis and Staffing Plan Report Memo, Guidance and 0 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE 0 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process continues to cover technical capability needs to address defense nuclear facility and related operational hazards. Memo and Workforce Analysis Guidance for FR, SSO, STSM & TQP Template-2010.docx Description TEMPLATE More Documents & Publications 2010 Annual Workforce Analysis and Staffing Plan Report - Carlsbad Field

399

Track B - Critical Guidance for Peak Performance Homes | Department of  

Broader source: Energy.gov (indexed) [DOE]

Track B - Critical Guidance for Peak Performance Homes Track B - Critical Guidance for Peak Performance Homes Track B - Critical Guidance for Peak Performance Homes Presentations from Track B, Critical Guidance for Peak Performance Homes of the U.S. Department of Energy Building America program's 2012 Residential Energy Efficiency Stakeholder Meeting are provided below as Adobe Acrobat PDFs. These presentations for this track covered the following topics: Ventilation Strategies in High Performance Homes; Combustion Safety in Tight Houses; Implementation Program Case Studies; Field Testing from Start to Finish; and Humidity Control and Analysis. why_we_ventilate.pdf formaldehyde_new_homes.pdf whole_bldg_ventilation.pdf combustion_safety_codes.pdf combustion_diagnostics.pdf test_protocols_results.pdf utility_incentive_programs.pdf

400

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson  

Broader source: Energy.gov (indexed) [DOE]

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted In accordance with Section 1.3 (Interim Enforcement Guidance) of the DOE Enforcement Handbook (1087- 95), this document responds to questions regarding the manner in which DOE's enforcement policy, as set forth in 10 CFR Part 820, Appendix A (Enforcement Policy), will be applied to identified violations of the provisions of 10 CFR Part 835 when the violation involves a regulatory provision for which the contractor has requested exemption. The DOE Office of Worker Protection Programs and

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Additional Guidance Regarding Application of Current Procedures for Testing  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE interpretive rule, which sets out DOE's views on the clothes washer testing procedure described in 10 CFR § 430 Appendix J1, having to do with how to apply the testing procedures to washers with a warm rinse option. This draft interpretive rule represents DOE's interpretation of

402

DOE Launches Public Test Procedure Guidance Website | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Launches Public Test Procedure Guidance Website Launches Public Test Procedure Guidance Website DOE Launches Public Test Procedure Guidance Website July 22, 2010 - 4:14pm Addthis The Department of Energy this week launched a new online database offering guidance on the Department's test procedures for appliances and commercial equipment. The new database will provide a publicly accessible forum for anyone with questions about -- or needing clarification of -- DOE's test procedures. This new online resource will also ensure that all manufacturers and members of the public are equally and immediately aware of the Department's interpretations of its test procedures. The database is available here. The database -- which is searchable by product category -- is designed to enable manufacturers, trade associations, and all other interested members

403

Microsoft Word - Penalty Guidance 5 7 2010 _final_.docx  

Broader source: Energy.gov (indexed) [DOE]

Guidance on the Imposition of Civil Penalties for Violations of EPCA Guidance on the Imposition of Civil Penalties for Violations of EPCA Conservation Standards and Certification Obligations The U.S. Department of Energy (Department or DOE) issues this guidance on civil penalties for violations of the Department's energy and water conservation standards and requirements. 1 In this Guidance, we (1) provide background on DOE's penalty authority; (2) explain our penalty policy; and (3) set forth our basic approach to the imposition of penalties for violations of DOE's standards and certification requirements. I. Background The Energy Policy and Conservation Act of 1975, as amended, (EPCA or the Act) authorizes the Department to enforce compliance with the energy and water conservation standards established for certain consumer products and commercial equipment. 42 U.S.C. §§

404

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Broader source: Energy.gov (indexed) [DOE]

EPA -- Amended Environmental Impact Statement Filing System EPA -- Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

405

Implementation Guidance, Drug Testing - December 3, 2007 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) selected for Testing Designated Positions (TDP) As established in his memorandum dated September 14, 2007, the Secretary has determined that applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) will be in Testing Designated Positions (TDP) as specified in DOE Order 3792.3, Drug-Free Federal Workplace Testing Implementation Program, for Federal employees, and Title 10, Code of Federal Regulations, Part 707, Workplace Substance Abuse Programs at DOE Sites, for contractor employees. Accordingly,

406

Development of Guidance for Analysis of Beyond Design Basis Events |  

Broader source: Energy.gov (indexed) [DOE]

Development of Guidance for Analysis of Beyond Design Basis Events Development of Guidance for Analysis of Beyond Design Basis Events Development of Guidance for Analysis of Beyond Design Basis Events Wednesday, September 19 Presenter: Dr. James O'Brien, Director, Office of Nuclear Safety, Office of Health, Safety and Security, US Department of Energy Topics covered: Types of DOE Facilities â—¦ Research Reactors; â—¦ Weapons disassembly, maintenance, and testing facilities; â—¦ Nuclear material storage facilities; â—¦ Processing facilities; and waste disposal facilities. Safety Analysis Framework â—¦ DOE Nuclear Safety Policy â—¦ Nuclear Safety Rule â—¦ Nuclear Safety Analysis Standards â—¦ Documented Safety Analysis Guide Development of Guidance for Analysis of Beyond Design Basis Events More Documents & Publications DOE's Approach to Nuclear Facility Safety Analysis and Management

407

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Broader source: Energy.gov (indexed) [DOE]

Amended Environmental Impact Statement Filing System Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

408

Supplemental Guidance Regarding Compensatory Time Off for Travel |  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Guidance Regarding Compensatory Time Off for Travel Supplemental Guidance Regarding Compensatory Time Off for Travel Supplemental Guidance Regarding Compensatory Time Off for Travel Questions and answers on issues that supplement the final regulations on compensatory time for travel issued by the Office of Personnel Management. In addition, a sample worksheet is attached to assist travelers in determining and documenting their travel time that may be credited for compensatory time for travel. This information will be incorporated in Appendix D of the DOE Handbook on Overtime when the handbook is updated. Supplemental Guidance Regarding Compensatory Time Off for Travel Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov Phone 202-586-3372 More Documents & Publications DOE Handbook on Overtime

409

Memorandum: Direction and Guidance for Implementing Direct DOE Relationship  

Broader source: Energy.gov (indexed) [DOE]

Direction and Guidance for Implementing Direct DOE Direction and Guidance for Implementing Direct DOE Relationship & Funding for the EMSSAB Memorandum: Direction and Guidance for Implementing Direct DOE Relationship & Funding for the EMSSAB From: Designated Federal Officer, Sandra L. Waisley (EM-11) To: SSAB Members (G. Stegner, J. Reising, G. Bowman, T. Taylor, C. Gertz, B. Murphie, S. McCracken, M. Marvin, J. Rampe, A. Doswell, C. Anderson, B. Wethington, S. Brennan, K. Kozeliski, D. Dollins, P. Halsey, Y. Sherman, L. Bratcher, R. Warther, K. Klein, R. Schepens, F. Lockhart, J. Allison, R. Erickson, E. Sellers, K. Carlson, G. Boyd, R. Butler) The memorandum informs of Assistant Secrectary Roberson's direction and guidance for implementing a DOE direct relationship and funding approach for EM's Site-Specific Advisory Board (EMSSAB).

410

Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted  

Broader source: Energy.gov (indexed) [DOE]

Duration of Investigations Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and lnvestigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix A. Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted

411

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson  

Broader source: Energy.gov (indexed) [DOE]

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted In accordance with Section 1.3 (Interim Enforcement Guidance) of the DOE Enforcement Handbook (1087-95), this document responds to questions regarding the manner in which DOE's enforcement policy, as set forth in 10 CFR Part 820, Appendix A (Enforcement Policy), will be applied to identified violations of the provisions of 10 CFR Part 835 when the violation involves a regulatory provision for which the contractor has requested exemption. The DOE Office of Worker Protection Programs and

412

DOE NEPA Guidance and Requirements - Search Index - List of Contents |  

Broader source: Energy.gov (indexed) [DOE]

List of List of Contents DOE NEPA Guidance and Requirements - Search Index - List of Contents Return to Download Page The NEPA Guidance and Requirements - Search Index includes: A Brief Guide - DOE-wide Contracts For NEPA Documentation [DOE][2003] A Citizen's Guide to the NEPA - Having Your Voice Heard [CEQ][2007] A Resource Handbook on DOE Transportation Risk Assessment [DOE][2002] Actions During the NEPA Process - Interim Actions [DOE][2003] Administrative Record Guidance [DOJ][1991] Aligning the NEPA Process with EMS [CEQ][2007] Alternative Actions For Analysis in Site-wide NEPA Reviews [DOE][1992] Amended Environmental Impact Statement Filing System Guidance [EPA][2012] Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA [CEQ][1980] Analysis of Impacts to Workers in NEPA Documentation [DOE][1988]

413

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Deployment of Mobile Technologies for Nuclear Power Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers This report is a guidance document prepared for the benefit of commercial nuclear power plants' (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making,

414

Energy Department Issues Tribal Renewable Energy Purchase Guidance and  

Broader source: Energy.gov (indexed) [DOE]

Energy Department Issues Tribal Renewable Energy Purchase Guidance Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources December 5, 2012 - 4:40pm Addthis News Media Contact (202) 586-4940 WASHINGTON - At the White House Tribal Nations Conference today, the Energy Department announced two new initiatives aimed at driving increased energy production and sustainable economic development in Indian Country. As part of the Energy Department's efforts to support Tribal renewable energy production, Energy Secretary Steven Chu issued a policy statement and guidance that gives preference to Indian tribes when its facilities contract to purchase renewable energy products or by products, based on

415

FEMP (Federal Energy Management Program) presents alternative financing guidance memoranda  

SciTech Connect (OSTI)

Utility financing of energy efficient measures becomes easier to accomplish with the two new alternative financing guidance memoranda, released April 17, 1998, that address the use of utility incentives for Federal facilities. The memoranda have been approved by the Alternative Financing Guidance Committee on the Interagency Energy Management Task Force. The memoranda include: (1) Policy Statement No. 001: Authority to Sole Source Utility Service Contracts as Referenced in Section 152 of the Energy Policy Act (EPACT) of 1992; and (2) Policy Statement No. 002: Congressional Notification for Utility Projects Under the Authority of Section 152 of the Energy Policy Act (EPACT) of 1992. The purpose for developing the financing memoranda was to address specific issues within current Federal procurement regulations that require clarification or guidance. This new guidance will allow for increased use of utility incentives as a means of financing energy efficient and life cycle cost-effective projects in Federal facilities.

NONE

1998-06-01T23:59:59.000Z

416

POLICY GUIDANCE MEMORANDUM #33- Requirements for DOE Delegated Examining Procedures  

Broader source: Energy.gov [DOE]

The purpose of this guidance is to establish the Department of Energy’s (DOE’s) Delegated Examining policy and procedures in order to ensure an effective competitive examining program that supports...

417

Enforcement Guidance Supplement 00-01: Enforcement Position Relative...  

Broader source: Energy.gov (indexed) [DOE]

as a Contamination Area. DOE relevant guidance is contained in Implementation Guide DOE G 441.1-9, Radioactive Contamination Control Guide (699) and Article 238.3 of the DOE...

418

Ex Parte Communication_Kitable Refrigerator/Freezer Guidance  

Broader source: Energy.gov [DOE]

This memo memorializes the meeting between AHAM and the Department of Energy on September 25, for inclusion in the public docket. In summary, we discussed the need for DOE guidance regarding the...

419

Guidance Based Collision Avoidance of Coordinated Nonholonomic Autonomous Vehicles  

E-Print Network [OSTI]

Guidance Based Collision Avoidance of Coordinated Nonholonomic Autonomous Vehicles Xianbo Xiang following control, obstacle avoidance and collision free for coordinated multiple nonholonomic autonomous autonomous ve- hicles dealing with tasks could offer additional advantages, in terms of flexibility

Paris-Sud XI, Université de

420

University Guidance for the REPORTING OF ACCIDENTS, DISEASES AND  

E-Print Network [OSTI]

University Guidance for the REPORTING OF ACCIDENTS, DISEASES AND DANGEROUS OCCURANCES HEALTH INJURY, HOSPITALISATION, DISEASE AND DANGEROUS OCCURRENCES.2 Reporting Over Three Days Absence Injury.........................................2 4.3 Reporting a Dangerous

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Mini-Guidance Articles from Lessons Learned Quarterly Reports...  

Broader source: Energy.gov (indexed) [DOE]

by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were...

422

Review of Guidance for Health Care Ethics Committees  

Science Journals Connector (OSTI)

Guidance for Healthcare Ethics Committees edited by D. Micah Hester and Toby Schonfeld (2012) is a comprehensive guide for members of ethics committees. The book is designed to address the three es...

Lauren Sydney Flicker

2014-12-01T23:59:59.000Z

423

DOE Launches Public Test Procedure Guidance Website | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Public Test Procedure Guidance Website Public Test Procedure Guidance Website DOE Launches Public Test Procedure Guidance Website July 22, 2010 - 4:14pm Addthis The Department of Energy this week launched a new online database offering guidance on the Department's test procedures for appliances and commercial equipment. The new database will provide a publicly accessible forum for anyone with questions about -- or needing clarification of -- DOE's test procedures. This new online resource will also ensure that all manufacturers and members of the public are equally and immediately aware of the Department's interpretations of its test procedures. The database is available here. The database -- which is searchable by product category -- is designed to enable manufacturers, trade associations, and all other interested members

424

The Advanced Candu reactor annunciation system - Compliance with IEC standard and US NRC guidelines  

SciTech Connect (OSTI)

Annunciation is a key plant information system that alerts Operations staff to important changes in plant processes and systems. Operational experience at nuclear stations worldwide has shown that many annunciation implementations do not provide the support needed by Operations staff in all plant situations. To address utility needs for annunciation improvement in Candu plants, AECL in partnership with Canadian Candu utilities, undertook an annunciation improvement program in the early nineties. The outcome of the research and engineering development program was the development and simulator validation of alarm processing, display, and information presentation techniques that provide practical and effective solutions to key operational deficiencies with earlier annunciation implementations. The improved annunciation capabilities consist of a series of detection, information processing and presentation functions called the Candu Annunciation Message List System (CAMLS). The CAMLS concepts embody alarm processing, presentation and interaction techniques, and strategies and methods for annunciation system configuration to ensure improved annunciation support for all plant situations, especially in upset situations where the alarm generation rate is high. The Advanced Candu Reactor (ACR) project will employ the CAMLS annunciation concepts as the basis for primary annunciation implementations. The primary annunciation systems will be implemented from CAMLS applications hosted on AECL Advanced Control Centre Information System (ACCIS) computing technology. The ACR project has also chosen to implement main control room annunciation aspects in conformance with the following international standard and regulatory review guide for control room annunciation practice: International Electrotechnical Commission (IEC) 62241 - Main Control Room, Alarm Function and Presentation (International standard) US NRC NUREG-0700 - Human-System Interface Design Review Guidelines, Section 4 - Alarm System (Regulatory review guide) In order for the ACR annunciation system to comply with IEC-62241 and NUREG-0700, the CAMLS concepts must satisfy their respective requirements and guidelines. This paper will provide a summary of how CAMLS complies with IEC-62241 and NUREG-0700. Overall, the CAMLS-based annunciation requirements conform to the intent of the recommended annunciation practices included in both these documents. However, there are minor differences in requirements interpretation and annunciation practice between CAMLS implementation concepts and the recommended practice in each document. Generally the differences with IEC-62241 revolve around definitions, the display properties of new alarms, and video display unit (VDU) alarm display organization. The differences with NUREG-0700 revolve around segregation of status alarms, the use of spatially dedicated, continuously visible displays, simultaneous display of high-priority alarms, audible signals for alarm states and reminder signals, blank lines in alarm message lists and manual silencing. These minor differences are discussed and rationales for the CAMLS implementation concepts are provided. (authors)

Leger, R.; Malcolm, S. [Atomic Energy of Canada Limited, 2251 Speakman Drive, Mississauga, Ont. L5K 1B2 (Canada); Davey, E. [Crew Systems Solutions, Deep River, Ont. K0J 1P0 (Canada)

2006-07-01T23:59:59.000Z

425

Final Guidance for Effective Use of Programmatic NEPA Review  

Broader source: Energy.gov [DOE]

On December 18, 2014, CEQ published final guidance that provides clarification on when and how Federal agencies can use programmatic NEPA reviews in accordance with the National Environmental Policy Act (NEPA) and the CEQ NEPA Regulations. Guidance on programmatic NEPA reviews has been requested by the agencies and attention on programmatic NEPA reviews has increased as agencies are increasingly undertaking broad landscape scale analyses for proposals that affect the resources they manage.

426

US EPA: OSWER: Risk Assessment Guidance for Superfund, January 2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

540-R-070-002 540-R-070-002 OSWER 9285.7-82 January 2009 Risk Assessment Guidance for Superfund Volume I: Human Health Evaluation Manual (Part F, Supplemental Guidance for Inhalation Risk Assessment) Final Office of Superfund Remediation and Technology Innovation Environmental Protection Agency Washington, D.C. TABLE OF CONTENTS 1. INTRODUCTION......................................................................................................................1 1.1 Background ....................................................................................................................1 1.2 Purpose and Scope .........................................................................................................2 1.3 Effects on Other Office of Superfund Remediation and Technology

427

POLICY GUIDANCE MEMORANDUM #08 DOE Fair Labor Standards Act (FLSA) Exempt/Non-Exempt Status Determination  

Broader source: Energy.gov [DOE]

This memorandum provides guidance on determining an employee's Fair Labor Standards Act status within the Department.

428

World oil prices expected to fall  

Science Journals Connector (OSTI)

World oil prices expected to fall ... The good news is that world oil prices probably will fall somewhat in the near future. ... The bad news is that oil prices probably will begin rising again in the mid-1980s, and even the optimists suspect that they will continue to do so thereafter. ...

1983-10-10T23:59:59.000Z

429

FOR THE RECORD Expectations from structural genomics  

E-Print Network [OSTI]

on the history of proteins classified in the SCOP structure database, we expect that only about a quarter! can help answer this question. The SCOP database ~Murzin et al., 1995! organizes proteins according a new experiment on a protein sequence identical or nearly identical to one already in the database

430

Grid Security: Expecting the Mingchao Ma  

E-Print Network [OSTI]

Grid Security: Expecting the Unexpected Mingchao Ma STFC � Rutherford Appleton Laboratory, UK #12;Slide 2 Overview � Security Service Challenges (SSC) Review � Grid Security Incident � What had happened of the LCG/EGEE Grid Sites (Dec 2008) http://www.gridpp.ac.uk/security/ssc/ https

University College London

431

Asymptotic Analysis of Multivariate Tail Conditional Expectations  

E-Print Network [OSTI]

instruments so that the resulting position (X) - X is acceptable to regulators/supervisors. The coherent risk related to various coherent risk measures. In the univari- ate case, the tail conditional expectation is asymptotically proportional to the value-at-risk, a popular risk measure. The focus of this paper

Li, Haijun

432

Asymptotic Analysis of Multivariate Tail Conditional Expectations  

E-Print Network [OSTI]

instruments so that the resulting position (X) - X is acceptable to regulators/supervisors. The coherent risk and are closely related to various coherent risk measures. In the univari- ate case, the tail conditional expectation is asymptotically proportional to the value-at-risk, a popular risk measure. The focus

Li, Haijun

433

State Energy Program and Energy Efficiency and Conservation Block Grant Program Guidance 13-001: Guidance for Returning Interest Earned  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) State Energy Program (SEP) and Energy Efficiency and Conservation Block Grant (EECBG) Program guidance document for returning interest earned; Program year 2013.

434

NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669  

SciTech Connect (OSTI)

The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

Not Available

1992-08-01T23:59:59.000Z

435

Enforcement Guidance Supplement 03-01, Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS: 03-01 Appendix E-Operational Procedures for Enforcement Department of Energy Washington, DC 20585 July 21, 2003 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS

436

Setting clear expectations for safety basis development  

SciTech Connect (OSTI)

DOE-RL has set clear expectations for a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (10 CFR 830, Nuclear Safety Rule) which will ensure long-term benefit to Hanford. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development resulting in a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was issued to standardized methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was issued for the evaluation of radiological consequences for accident scenarios often postulated for Hanford. A standard Site Documented Safety Analysis (DSA) detailing the safety management programs was issued for use as a means of compliance with a majority of 3009 Standard chapters. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. As a result of setting expectations and providing safety analysis tools, the four Hanford Site waste management nuclear facilities were able to integrate into one Master Waste Management Documented Safety Analysis (WM-DSA).

MORENO, M.R.

2003-05-03T23:59:59.000Z

437

Guidance on NEPA Review for Corrective Actions under the Resource  

Broader source: Energy.gov (indexed) [DOE]

NEPA Review for Corrective Actions under the Resource NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

438

Guidance for Developing Baseline and Annual Water Use | Department of  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Developing Baseline and Annual Water Use Guidance for Developing Baseline and Annual Water Use Guidance for Developing Baseline and Annual Water Use Potable water use intensity is defined as annual potable water use divided by total gross square footage of facility space (gal/ft2). The facility gross square footage is the same value used for energy use intensity reduction goals. Executive Order (E.O.) 13423 requires Federal agencies to develop a potable water use intensity baseline for fiscal year (FY) 2007. Agencies must report total potable water consumption and gross facility square footage against that baseline. To avoid additional reporting requirements, E.O. 13423 does not require agencies to report square footage of irrigated turf or landscape. Potable water used for landscape irrigation must be reported in total potable water

439

Guidance on Reading the Scorecard | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance on Reading the Scorecard Guidance on Reading the Scorecard Guidance on Reading the Scorecard The Site-level Regulatory Scorecard comprises three interrelated tables: (i) an aggregate red-yellow-green site summary, (ii) detailed text on notices of violation and associated penalties and fines, and (iii) raw milestone data and other environmental indicators. All three tables report on the status of past and future major enforceable milestones. Past data refer to major enforceable milestones due in the past quarter; future data refer to the status of major enforceable milestones due four quarters out. Aggregate site summary. The first table is a compilation of the aggregate status of notices of violation/penalties/regulatory milestones and other environmental indicators. Listed sites in the first column are those in the

440

Enforcement Guidance Supplement 01-02: Management and Independent  

Broader source: Energy.gov (indexed) [DOE]

provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors. DOE enforcement activities to date have indicated the need for improvement in contractor compliance with the Management and Independent Assessment (M&IA) requirements of 10 CFR 830.122. This EGS signals an increased emphasis by OE in this area, and describes the general approach that will be used by OE in evaluating compliance of nuclear-safety related M&IA Programs. EGS0102.PDF Description

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Guidance Concerning Certification Following a Change in the Applicable  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Concerning Certification Following a Change in the Concerning Certification Following a Change in the Applicable Energy or Water Conservation Standard Guidance Concerning Certification Following a Change in the Applicable Energy or Water Conservation Standard Guidance regardling the applicability of changes in the EPCA standards. If any manufacturer's previous certification demonstrates that the basic model meets the NEW standard, no additional certification is necessary. If any manufacturer's previous certification does not demonstrate that the basic model meets the NEW standard, that model has not been certified. It may not be distributed once the new standard takes effect unless the manufacturer submits a new certification report demonstrating that the basic model meets the new standard. Guidance Concerning Certification Following a Change in the Applicable

442

DOE General Counsel Issues Arbitration Guidance for Management and  

Broader source: Energy.gov (indexed) [DOE]

General Counsel Issues Arbitration Guidance for Management and General Counsel Issues Arbitration Guidance for Management and Operations Contractors DOE General Counsel Issues Arbitration Guidance for Management and Operations Contractors February 3, 2010 - 5:31pm Addthis Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with third-parties. We have determined that there is currently no legal prohibition on M&O contractors including binding arbitration clauses in their contracts with others. In fact, we believe it often will be a good idea to include arbitration clauses as a means of limiting the risk of litigation which is often more time consuming and expensive than

443

File:Breakout Session Guidance.pdf | Open Energy Information  

Open Energy Info (EERE)

Breakout Session Guidance.pdf Breakout Session Guidance.pdf Jump to: navigation, search File File history File usage File:Breakout Session Guidance.pdf Size of this preview: 800 × 600 pixels. Go to page 1 2 3 4 5 Go! next page → next page → Full resolution ‎(1,500 × 1,125 pixels, file size: 69 KB, MIME type: application/pdf, 5 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:01, 10 July 2012 Thumbnail for version as of 10:01, 10 July 2012 1,500 × 1,125, 5 pages (69 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: Energy Data Initiative/Resources

444

MHK LCOE Reporting Guidance Draft | OpenEI Community  

Open Energy Info (EERE)

MHK LCOE Reporting Guidance Draft MHK LCOE Reporting Guidance Draft Home > Groups > Water Power Forum Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment. The primary files for review are the: "DOE LCOE Reporting Guidance" Word document an Excel workbook containing the reference resource data for Wave

445

Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of  

Broader source: Energy.gov (indexed) [DOE]

99-02: DOE Enforcement Activities 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of Energy's nuclear safety requirements in 10 CFR 835 (Occupational Radiation Protection Programs) and 10 CFR 830.120

446

SUBJECT: Guidance on Retention of Facility Representative Technical  

Broader source: Energy.gov (indexed) [DOE]

SUBJECT: Guidance on Retention of Facility Representative Technical SUBJECT: Guidance on Retention of Facility Representative Technical Competence during Reductions in Force, 4/21/1998 SUBJECT: Guidance on Retention of Facility Representative Technical Competence during Reductions in Force, 4/21/1998 The Department's Revised Implementation Plan (IP) for Defense Nuclear Facilities Safety Board Recommendation 93-3 renews the Department's commitment to maintaining the technical capability necessary to safely manage and operate defense nuclear facilities. Retaining highly qualified employees in critical technical skills areas is vital to the maintenance of these technical capabilities. The Department has therefore committed in the revised R? to the development of a model that offices can use to proactively manage and preserve critical technical capabilities. During the

447

Guidance for Local Wind Energy Ordinances | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Guidance for Local Wind Energy Ordinances Guidance for Local Wind Energy Ordinances < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Wind Buying & Making Electricity Program Info State New York Program Type Solar/Wind Permitting Standards Provider New York State Energy Research and Development Authority Note: The documents described in this summary were designed to provide guidance to local governments that wish to develop their own siting rules for wind turbines. While they were developed under contract with the New York State Energy Research and Development Authority (NYSERDA), a state agency, none of the documents themselves have any legal or regulatory

448

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where  

Broader source: Energy.gov (indexed) [DOE]

Present. Present. Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present. Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas, (1) transportation issues that involve on-site transportation typically not regulated by the Department of Transportation (DOT), and (2) transportation issues that involve off-site transportation. This guidance addresses off-site transportation that is regulated by DOT and other state and federal agencies. Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present.

449

Risk Assessment Guidance for Superfund, Vol.II  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

United States United States Office of Emergency and EPA/540/1-89/001 Environmental Protection Remedial Responce March 1989 Agency Washington, DC 20460 Superfund Risk Assessment Guidance for Superfund Volume II Environmental Evaluation Manual Interim Final EPA EPA/540/1-89/001 March 1989 Risk Assessment Guidance for Superfund Volume II Environmental Evaluation Manual Interim Final Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 Disclaimer The policies and procedures set forth here are intended as guidance to Agency and other government employees. They do not constitute rulemaking by the Agency, and may not be relied on to create a substantive or procedural right enforceable by any other person. The Government may take action

450

Guidance on EIS Review and Recovery Act Loan Guarantee Applications |  

Broader source: Energy.gov (indexed) [DOE]

Guidance on EIS Review and Recovery Act Loan Guarantee Applications Guidance on EIS Review and Recovery Act Loan Guarantee Applications Guidance on EIS Review and Recovery Act Loan Guarantee Applications June 8, 2010 - 2:22pm Addthis DOE must complete NEPA review before it may provide financial assistance in the form of loan guarantees. Projects seeking such assistance under Section 1705 of Title XVII of the Energy Policy Act of 2005, 22 U.S.C. 16511-16514, must commence construction no later than September 30, 2011. Because many of DOE's Environmental Impact Statements (EISs) take 18-24 months to complete, the Department has previously notified applicants that DOE, "will be unlikely to complete the NEPA process" for a project requiring an EIS in sufficient time to make an award. This statement has led to questions whether there are any circumstances under which DOE may be

451

GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM  

Broader source: Energy.gov (indexed) [DOE]

GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM The Department of Energy has on a variety of occasions engaged in transactions under which it bartered uranium to which it has title for goods or services . This guidance memorializes the results of analyses previously directed to individual proposed transactions . For the reasons discussed below, we conclude that the Atomic Energy Act of 1954' , as amended, (AEA), authorizes such barter transactions. Background : DOE Barter Transactions In a number of instances, DOE has engaged in transactions involving the barter of DOE-owned uranium2 in exchange for various products or services. For example, DOE entered into a transaction with the United States Enrichment Corporation (USEC), under which USEC would

452

Energy.gov Article Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Policies » Energy.gov Article Guidance Policies » Energy.gov Article Guidance Energy.gov Article Guidance Energy.gov is managed by a team of digital communications specialists in the Office of Digital Strategy and Communications, part of the Energy Department's Office of Public Affairs. Our goal is to educate the general public about the Department's work -- who we are, what we do and -- most important -- why it matters. We achieve this goal by creating engaging, informative content that's accessible and exciting to regular people. Our ethos is that the future of energy is now, today, all around us -- and the people and programs of the Energy Department are where it's happening. We work with staff across the agency to produce original blog posts, social media content, videos, infographics, interactive maps, data

453

Energy Department Releases New Greenhouse Gas Reporting Guidance, Seeks  

Broader source: Energy.gov (indexed) [DOE]

Greenhouse Gas Reporting Guidance, Greenhouse Gas Reporting Guidance, Seeks Public Comment Energy Department Releases New Greenhouse Gas Reporting Guidance, Seeks Public Comment March 22, 2005 - 10:54am Addthis Program Will Ensure Greater Accuracy & Completeness WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today asked for further public comment on its revised guidelines for voluntary reporting of greenhouse gas emissions, sequestration and emission reductions. The program was established by section 1605(b) of the Energy Policy Act of 1992 and will help fulfill President George W. Bush's directive that DOE enhance its voluntary reporting program to reduce overall greenhouse gas emissions while improving the accuracy, verifiability and completeness of emissions data reported to the Federal Government.

454

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Broader source: Energy.gov (indexed) [DOE]

Electric Vehicle Recharging Stations Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs. In addition, lab contractors may install electric vehicle recharging

455

Federal Requirements and Acquisition Guidance for Low Standby Power  

Broader source: Energy.gov (indexed) [DOE]

Federal Requirements and Acquisition Guidance for Low Standby Power Federal Requirements and Acquisition Guidance for Low Standby Power Products Federal Requirements and Acquisition Guidance for Low Standby Power Products Updated July 2013 Federal agencies must purchase products with a standby power level of 1 watt or less. Standby power is the power consumed by a product when in the lowest power consuming mode. This typically occurs when the product is switched off or not performing its primary purpose. These additional resources can also help Federal agencies meet low standby power purchasing requirements: Low Standby Product List Measuring Standby Power Frequently Asked Questions Meeting Low Standby Power Requirements Table 1 outlines specific standby power requirements and compliance resources by product category. Federal purchases must meet these low

456

Federal Energy Efficiency Acquisition Guidance and Requirements for  

Broader source: Energy.gov (indexed) [DOE]

Heat Pump Water Heaters Heat Pump Water Heaters Federal Energy Efficiency Acquisition Guidance and Requirements for Residential Heat Pump Water Heaters October 30, 2013 - 9:50am Addthis Did You Know? Heat pump water heaters are the most efficient electric water heaters available, saving 50% to 60% over standard products. FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including residential heat pump water heaters, which are an ENERGY STAR®-qualified product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. The following guidance and requirements apply to residential heat pump water heaters that operate on 250 volts or less, have a current rating of

457

IRS Announces New Tribal Economic Development Bond Allocation Guidance |  

Broader source: Energy.gov (indexed) [DOE]

IRS Announces New Tribal Economic Development Bond Allocation IRS Announces New Tribal Economic Development Bond Allocation Guidance IRS Announces New Tribal Economic Development Bond Allocation Guidance July 18, 2012 - 3:46pm Addthis To promote economic growth in tribal communities, Treasury and the Internal Revenue Service (IRS) published new guidance on July 18, 2012, allocating Tribal Economic Development Bonds (TEDBs). The TEDB program was established under the American Reinvestment and Recovery Act, and provides Tribes with the authority to issue tax-exempt debt for a wider range of activities to spur job creation and promote economic growth in Indian country. Providing Tribes with the ability to issue tax-exempt debt for a broader scope of activities similar to that available to states and local governments lowers

458

Building America Climate-Specific Guidance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

America » Building America America » Building America Climate-Specific Guidance Building America Climate-Specific Guidance Building America Climate-Specific Guidance Building America's Best Practices guides and case studies demonstrate real world solutions for improving the energy performance and quality of new and existing homes in five major climate regions. Find examples of proven high-performance home building and remodeling in your area by selecting a climate zone below. In addition, you may view technology-specific building solutions that work across all climates. Cold and Very Cold Climates Hot-Dry and Mixed-Dry Climates Hot-Humid Climates Marine Climates Mixed-Humid Climates All Climates For additional, updated information on hundreds of building science topics that can help you build or retrofit to the most recent high-performance

459

MCA4Climate - Guidance for scientifically sound climate change planning |  

Open Energy Info (EERE)

MCA4Climate - Guidance for scientifically sound climate change planning MCA4Climate - Guidance for scientifically sound climate change planning Jump to: navigation, search LEDSGP green logo.png FIND MORE DIA TOOLS This tool is part of the Development Impacts Assessment (DIA) Toolkit from the LEDS Global Partnership. Tool Summary LAUNCH TOOL Name: Multicriteria Analysis for Climate (MCA4climate) Agency/Company /Organization: United Nations Environment Programme (UNEP), World Bank Climate Smart Planning Platform Sector: Climate, Energy, Land Topics: Co-benefits assessment, Low emission development planning, Policies/deployment programs Resource Type: Guide/manual Complexity/Ease of Use: Moderate Website: www.mca4climate.info/ Program Start: 2011 Cost: Free Multicriteria Analysis for Climate (MCA4climate) Screenshot References: MCA4Climate - Guidance for scientifically sound climate change planning[1]

460

Guidance on National Environment Policy Act Categorical Exclusion Determination  

Broader source: Energy.gov (indexed) [DOE]

Government Department of Energy Government Department of Energy memorandum DATE: January 16, 1998 REPLY TO ATTN OF: Office of NEPA Policy and Assistance: Osborne: 202-586-4596 SUBJECT: Guidance on National Environmental Policy Act (NEPA) Categorical Exclusion Determinations TO: Secretarial Officers and Heads of Field Organizations This memorandum provides a reminder of the requirements for applying categorical exclusions pursuant to the Department of Energy's (DOE's) NEPA regulations and guidance for simple recordkeeping of such determinations. Recent litigation has prompted our review of DOE's procedures for making these determinations. The draft version of this guidance was discussed at the June 1997 NEPA Community Meeting. Issues raised then that are not addressed here concern the

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Energy management guidance | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools and resources Tools and resources » Energy management guidance Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

462

Microsoft Word - DRAFT CRB Interview Guidance.doc  

Broader source: Energy.gov (indexed) [DOE]

Certification Review Board Interview Guidance Certification Review Board Interview Guidance 1 Background and Scope: The Certification Review Board (CRB) conducts interviews for Level 3 and 4 certification candidates, unless otherwise waived by the CRB (see Appendix C of the March, 2009 PMCDP Certification and Equivalency Guidelines ). These interviews allow aspiring Level 3 and 4 federal project directors to demonstrate verbally their mastery of the requisite leadership expertise, to include the expert management of project resources and accountability for project successes and failures, needed to manage high-dollar, mission-critical DOE projects effectively. Interview Structure and Process: Candidate interviews are conducted after the certification candidate's profile has been provisionally

463

National Security Information Classification Guidance Fundamental Review, June 2012  

Broader source: Energy.gov (indexed) [DOE]

Security Security Information Fundamental Classification Guidance Review Report to the Information Security Oversight Office June 2012 United States Department of Energy Washington, DC 20585 Department of Energy | June 2012 National Security Information Fundamental Classification Guidance Review | Page iii Executive Summary Section 1.9 of Executive Order (E.O.) 13526, Classified National Security Information, dated December 29, 2009, directs agency heads to complete a comprehensive review of agency classification guides to ensure they reflect current circumstances and to identify classified information that no longer requires protection and can be declassified. To meet this requirement, the Department of Energy (DOE), under the direction of the Senior Agency Official, devoted

464

Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073  

SciTech Connect (OSTI)

'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go. That was due in large measure to the fact that the NRC has a well-tested system of responding to nuclear emergencies, and we followed our plan. (authors)

Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca [U.S. Nuclear Regulatory Commission, Rockville, MD 20852 (United States)

2012-07-01T23:59:59.000Z

465

Expected dose and associated uncertainty and sensitivity analysis results for the human intrusion scenario in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the determination of expected (mean) dose to the reasonably maximally exposed individual (RMEI) specified in the NRC regulations for the YM repository resulting from an inadvertent drilling intrusion into the repository. The following topics are addressed: (i) assumed properties of an inadvertent drilling intrusion and the determination of the associated dose and expected (mean) dose to the RMEI, (ii) uncertainty and sensitivity analysis results for expected dose to the RMEI, and (iii) the numerical stability of the sampling-based procedure used to estimate expected (mean) dose to the RMEI. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

C.W. Hansen; G.A. Behie; K.M. Brooks; Y. Chen; J.C. Helton; S.P. Hommel; K.P. Lee; B. Lester; P.D. Mattie; S. Mehta; S.P. Miller; C.J. Sallaberry; S.D. Sevougian

2014-01-01T23:59:59.000Z

466

DOE-HSS Expectations.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HSS HSS Expectations for Nanoscale Safety and Health Argonne National Laboratory July 7-9, 2008 Patricia R. Worthington, PhD Director, Office of Health and Safety Office of Health, Safety, and Security 2 Role of HSS Policy Development * Role of HSS is to develop the ES&H policy * HSS may also coordinate, collaborate, and assist in policy development with other organizations * The approach to developing policy could be a top-down or bottom-up approach 3 History of DOE Nano Policy * 7/04 - White Paper, "Ensuring the Safety and Viability of Nanotechnology" * 3/05 - 1 st meeting of Emerging Technology Workgroup to discuss nanotechnology * 5/05 - Safety Bulletin , "Good Practices for Handling Nanomaterials" 4 History of DOE Nano Policy * 9/05 - DOE P 456.1 "Secretarial Policy Statement On

467

Colorado Natural Gas Plant Liquids, Expected Future Production...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Expected Future Production (Million Barrels) Colorado Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

468

Oklahoma Natural Gas Plant Liquids, Expected Future Production...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plant Liquids, Expected Future Production (Million Barrels) Oklahoma Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

469

Louisiana--State Offshore Natural Gas Plant Liquids, Expected...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Expected Future Production (Million Barrels) Louisiana--State Offshore Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

470

California--State Offshore Natural Gas Plant Liquids, Expected...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Plant Liquids, Expected Future Production (Million Barrels) California--State Offshore Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1...

471

Federal Offshore--Texas Natural Gas Plant Liquids, Expected Future...  

Gasoline and Diesel Fuel Update (EIA)

Expected Future Production (Million Barrels) Federal Offshore--Texas Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

472

Federal Offshore--California Natural Gas Plant Liquids, Expected...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Expected Future Production (Million Barrels) Federal Offshore--California Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

473

Texas State Offshore Dry Natural Gas Expected Future Production...  

U.S. Energy Information Administration (EIA) Indexed Site

Dry Natural Gas Expected Future Production (Billion Cubic Feet) Texas State Offshore Dry Natural Gas Expected Future Production (Billion Cubic Feet) Decade Year-0 Year-1 Year-2...

474

Louisiana State Offshore Dry Natural Gas Expected Future Production...  

Gasoline and Diesel Fuel Update (EIA)

Dry Natural Gas Expected Future Production (Billion Cubic Feet) Louisiana State Offshore Dry Natural Gas Expected Future Production (Billion Cubic Feet) Decade Year-0 Year-1 Year-2...

475

California State Offshore Dry Natural Gas Expected Future Production...  

Gasoline and Diesel Fuel Update (EIA)

Dry Natural Gas Expected Future Production (Billion Cubic Feet) California State Offshore Dry Natural Gas Expected Future Production (Billion Cubic Feet) Decade Year-0 Year-1...

476

Texas (with State Offshore) Natural Gas Plant Liquids, Expected...  

Gasoline and Diesel Fuel Update (EIA)

Expected Future Production (Million Barrels) Texas (with State Offshore) Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

477

Lower 48 Federal Offshore Natural Gas Plant Liquids, Expected...  

U.S. Energy Information Administration (EIA) Indexed Site

Plant Liquids, Expected Future Production (Million Barrels) Lower 48 Federal Offshore Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1...

478

Louisiana (with State Offshore) Natural Gas Plant Liquids, Expected...  

Gasoline and Diesel Fuel Update (EIA)

Expected Future Production (Million Barrels) Louisiana (with State Offshore) Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2...

479

Alabama (with State Offshore) Natural Gas Plant Liquids, Expected...  

U.S. Energy Information Administration (EIA) Indexed Site

Plant Liquids, Expected Future Production (Million Barrels) Alabama (with State Offshore) Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0...

480

California (with State Offshore) Natural Gas Plant Liquids, Expected...  

U.S. Energy Information Administration (EIA) Indexed Site

Plant Liquids, Expected Future Production (Million Barrels) California (with State Offshore) Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0...

Note: This page contains sample records for the topic "guidance nrc expects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Alaska (with Total Offshore) Natural Gas Plant Liquids, Expected...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Expected Future Production (Million Barrels) Alaska (with Total Offshore) Natural Gas Plant Liquids, Expected Future Production (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3...

482

TREE SEEDING BPG NOTE 10 Best Practice Guidance  

E-Print Network [OSTI]

woodland on reclaimed land is a complex process! To achieve a sustainable tree cover many activities needTREE SEEDING BPG NOTE 10 Best Practice Guidance for Land Regeneration Introduction Establishing of thumb' applies strongly in the case of tree establishment. Conventionally, this has usually been

483

REGULATORY GUIDANCE No. 06 -02 Date: July 6, 2006  

E-Print Network [OSTI]

), this guidance applies to the transportation of dredged material for the purpose of dumping it into ocean waters it is determined that testing is needed, however, the physical, chemical, and biological (bioassay) tests relied.S. in accordance with guidelines promulgated by the administrator, the Environmental Protection Agency (EPA) under

US Army Corps of Engineers

484

Improving Lightning Cessation Guidance Using Polarimetric Radar Data  

Science Journals Connector (OSTI)

Polarimetric radar data are used to develop lightning cessation guidance for the Cape Canaveral area of central Florida. Eighty non-severe thunderstorm cells in 2012, mostly during the warm season, are analyzed for this purpose. In-cloud and cloud-...

Ari D. Preston; Henry E. Fuelberg

485

Soil Vapor Extraction System Optimization, Transition, and Closure Guidance  

SciTech Connect (OSTI)

Soil vapor extraction (SVE) is a prevalent remediation approach for volatile contaminants in the vadose zone. A diminishing rate of contaminant extraction over time is typically observed due to 1) diminishing contaminant mass, and/or 2) slow rates of removal for contamination in low-permeability zones. After a SVE system begins to show indications of diminishing contaminant removal rate, SVE performance needs to be evaluated to determine whether the system should be optimized, terminated, or transitioned to another technology to replace or augment SVE. This guidance specifically addresses the elements of this type of performance assessment. While not specifically presented, the approach and analyses in this guidance could also be applied at the onset of remediation selection for a site as a way to evaluate current or future impacts to groundwater from vadose zone contamination. The guidance presented here builds from existing guidance for SVE design, operation, optimization, and closure from the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, and the Air Force Center for Engineering and the Environment. The purpose of the material herein is to clarify and focus on the specific actions and decisions related to SVE optimization, transition, and/or closure.

Truex, Michael J.; Becker, Dave; Simon, Michelle A.; Oostrom, Martinus; Rice, Amy K.; Johnson, Christian D.

2013-02-08T23:59:59.000Z

486

Project Research and Development (PRD) scheme Guidance for Academic Applicants  

E-Print Network [OSTI]

1 Project Research and Development (PRD) scheme ­ Guidance for Academic Applicants Contents science and technology leadership in future Science and Technology Facility Council projects and gives and development projects which enable STFC to deliver the science programme objectives in the areas of particle

487

Project Research and Development (PRD) scheme Guidance for Applicants  

E-Print Network [OSTI]

1 Project Research and Development (PRD) scheme ­ Guidance for Applicants Contents Contents science and technology leadership in future Science and Technology Facility Council projects and gives and development projects which enable STFC to deliver the science programme objectives in the areas of particle

488

SPAR-H Step-by-Step Guidance  

SciTech Connect (OSTI)

Step-by-step guidance was developed recently at Idaho National Laboratory for the US Nuclear Regulatory Commission on the use of the Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method for quantifying Human Failure Events (HFEs). This work was done to address SPAR-H user needs, specifically requests for additional guidance on the proper application of various aspects of the methodology. This paper overviews the steps of the SPAR-H analysis process and highlights some of the most important insights gained during the development of the step-by-step directions. This supplemental guidance for analysts is applicable when plant-specific information is available, and goes beyond the general guidance provided in existing SPAR-H documentation. The steps highlighted in this paper are: Step-1, Categorizing the HFE as Diagnosis and/or Action; Step-2, Rate the Performance Shaping Factors; Step-3, Calculate PSF-Modified HEP; Step-4, Accounting for Dependence, and; Step-5, Minimum Value Cutoff.

April M. Whaley; Dana L. Kelly; Ronald L. Boring; William J. Galyean

2012-06-01T23:59:59.000Z

489

LOOSE TIPPING BPG NOTE 4 Best Practice Guidance  

E-Print Network [OSTI]

. For further details, see BPG Note 6: Application of sewage sludges and composts. I Improved vegetationLOOSE TIPPING BPG NOTE 4 Best Practice Guidance for Land Regeneration Introduction Reinstatement-scraper method (see for example: Bending et al., 1999; Land Research Associates, 1997, 2000; Moffat and Bending

490

COMPLETE CULTIVATION BPG NOTE 13 Best Practice Guidance  

E-Print Network [OSTI]

of sewage sludges and composts. Danielle Sinnett Figure 1 An excavator removing soil. #12;BPG NOTE 13 PAGE 2COMPLETE CULTIVATION BPG NOTE 13 Best Practice Guidance for Land Regeneration Introduction land within the UK, where traditional soil placement techniques using dozers followed by industrial

491

DETERMINATION OF GUIDANCE VALUES FOR CLOSED LANDFILL GAS EMISSIONS  

E-Print Network [OSTI]

DETERMINATION OF GUIDANCE VALUES FOR CLOSED LANDFILL GAS EMISSIONS O. BOUR*, S. BERGER**, C Gambetta, 74 000 Annecy SUMMARY: In order to promote active landfill gas collection and treatment or natural attenuation, it is necessary to identify trigger values concerning landfill gas emissions

Boyer, Edmond

492

Last Updated: August 2008 Data Protection Guidance: Marketing  

E-Print Network [OSTI]

Last Updated: August 2008 Data Protection Guidance: Marketing Direct marketing is communication (by whatever means) of any advertising/marketing material which is directed to particular individuals personal data for the purposes of direct marketing. This covers all marketing material that is not directly

Mumby, Peter J.

493

MODEL ANALYSES AND GUIDANCE (MAG) APPLICATION MAG User's Manual  

E-Print Network [OSTI]

the National Weather Service's (NWS) Numerical Weather Prediction computer models. The website offers Guidance: Provides a path to view products created from the National Weather Service's (NWS) numerical Weather Service's Tropical Cyclone models. These products are only available when tropical cyclones

494

THE INDUSTRIAL EXCELLENCE AWARD AS A TRAINING GUIDANCE TOOL  

E-Print Network [OSTI]

arising out of the industrial revolution, which has seen the emergence of explicit ways of producing goodsTHE INDUSTRIAL EXCELLENCE AWARD AS A TRAINING GUIDANCE TOOL NICHOLAS BILALIS, Professor Department. Introduction This paper presents an approach for meeting the current educational needs of industry

Aristomenis, Antoniadis

495

Guidance on Life-Cycle Cost Analysis Required by Executive Order...  

Energy Savers [EERE]

Guidance on Life-Cycle Cost Analysis Required by Executive Order 13123 Guidance on Life-Cycle Cost Analysis Required by Executive Order 13123 Guide describes the clarification of...

496

Energy Sector Cybersecurity Framework Implementation Guidance- Draft for Public Comment & Comment Submission Form (September 2014)  

Broader source: Energy.gov [DOE]

On September 12, 2014, the Department issued a Federal Register Notice announcing the availability of the Energy Sector Cybersecurity Framework Implementation Guidance for public comment. The draft Energy Sector Cybersecurity Framework Implementation Guidance and comment submission form are available.

497

Draft Guidance for Section 242 of the Energy Policy Act of 2005...  

Energy Savers [EERE]

Draft Guidance for Section 242 of the Energy Policy Act of 2005 - Hydroelectric Production Incentive Program - July 2014 Draft Guidance for Section 242 of the Energy Policy Act of...

498

Can. J. Fish. Aquat. Sci. 61: 11131123 (2004) doi: 10.1139/F04-061 2004 NRC Canada Influence of shoreline features on fish distribution  

E-Print Network [OSTI]

1113 Can. J. Fish. Aquat. Sci. 61: 1113­1123 (2004) doi: 10.1139/F04-061 © 2004 NRC Canada Influence of shoreline features on fish distribution in the Laurentian Great Lakes A. Wei, P. Chow-Fraser, and D. Albert Abstract: In this paper, we used assembled fish distributions (over 9500 field

McMaster University

499

Draft Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance 9Dec2010 Guidance 9Dec2010 i DRAFT Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253 Subsection (f), Use of Energy and Water Efficiency Measures in Federal Buildings) December 9, 2010 I. PURPOSE ............................................................................................................................................ 1 II. BACKGROUND ................................................................................................................................. 1 A. Authority ................................................................................................................................. 1 B. Related DOE Guidance and Activity ...................................................................................... 1

500

Energy Sector Framework Implementation Guidance Notice of Stakeholder Participation: Federal Register Notice Volume 79, No.- 119 June 20, 2014  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) invites public participation in DOE’s efforts to develop a guidance document entitled: Energy Sector Framework Implementation Guidance.